Powered by Deep Web Technologies
Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Joint Environmental Management System (EMS) Declaration of Conformance...  

Broader source: Energy.gov (indexed) [DOE]

Services Environmental Management System Joint Environmental Management System (EMS) Declaration of Conformance Joint Environmental Management System (EMS) Declaration of...

2

EMS - Environmental Management System | Princeton Plasma Physics...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the rigorous requirements the globally recognized International Organization for Standardization (ISO) 14001:2004 Environmental Management System Standard. In 2011, an EMS...

3

Joint Environmental Management System (EMS) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) The environmental management system (EMS) has two areas of focus: environmental compliance and environmental sustainability. The environmental compliance aspect of the EMS consists of regulatory compliance and monitoring programs that implement federal, state, local, and tribal requirements; agreements; and permits under the Legacy Management contract. The environmental sustainability aspect promotes and integrates sustainability initiatives such as energy and natural resource conservation, waste minimization, green construction, and use of eco-friendly products and services into all phases of work. U.S. Department of Energy (DOE) Office of Legacy Management (LM) EMS was

4

Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"  

Broader source: Energy.gov [DOE]

ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

5

EMERGENCY MANAGEMENT (EM)  

Broader source: Energy.gov (indexed) [DOE]

MANAGEMENT (EM) MANAGEMENT (EM) OBJECTIVE EM.1 A routine drill program and emergency operations drill program, including program records, have,been established and implemented. (Core Requirement 11) Criteria 1. Emergency preparedness drills and exercises are conducted and an adequate response capability,exists. 2. Routine operations drills and exercises are conducted and an adequate response capability exists. 3. Applicable emergency management documentation (e.g., Building Emergency Plan, emergency,response procedures, Emergency Preparedness Hazards Assessment, alarm response procedures,,and emergency response procedures) has been updated to reflect implementation of the TA-55 . Approach Record Reviews: Review the emergency management documents (e.g., Building

6

PNNL: About - Environmental Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Policy. Pacific Northwest Division (PNWD) uses the International Organization for Standardization (ISO 14001) Environmental Management System (EMS) as a tool to manage, control,...

7

Environmental Management System Plan  

E-Print Network [OSTI]

Water Discharges) of Introduction Environmental Managementmanagement Water conservation LBNL’s approach to sustainable environmentalEnvironmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: Protect the air, water,

Fox, Robert

2009-01-01T23:59:59.000Z

8

LRRB Pavement Management Systems Pavement Management Systems  

E-Print Network [OSTI]

LRRB Pavement Management Systems Pavement Management Systems Presented by: Michael Marti SRF for implementing and monitoring research results (RIC) #12;LRRB Pavement Management Systems LRRB Structure LRRB Current Pavement Management System Used ICON (Goodpointe) Year of Pavement Management System

Minnesota, University of

9

Environmental Management System (EMS) objectives&targets annual results summary : FY2012.  

SciTech Connect (OSTI)

Sandia National Laboratories/New Mexico's (SNL/NM) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each Fiscal Year (FY) SNL/NM performs an analysis to identify environmental aspects, and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are established to mitigate potential impacts of SNL/NM's operations on the environment. An annual summary of the results achieved towards meeting established objectives and targets provides a connection to, and rational for, annually revised environmental aspects. The purpose of this document is to summarize the results achieved and documented in FY2012.

Vetter, Douglas Walter

2013-02-01T23:59:59.000Z

10

EM Hosts Used Fuel Management Workshop | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EM Hosts Used Fuel Management Workshop EM Hosts Used Fuel Management Workshop EM Hosts Used Fuel Management Workshop September 30, 2013 - 12:00pm Addthis Participants in EM’s Office of Nuclear Materials Disposition workshop with Swedish executives gather for a photo. Participants in EM's Office of Nuclear Materials Disposition workshop with Swedish executives gather for a photo. WASHINGTON, D.C. - EM's Office of Nuclear Materials Disposition held a workshop with Swedish executives earlier this month to learn about their approaches to designing a national waste management program. EM officials met with representatives from SKB International, the consulting arm of SKB, the Swedish nuclear fuel and waste management company. They examined SKB's integrated waste management system, known as KBS-3, and the potential for efficiencies and lifecycle costs reductions

11

EMERGENCY MANAGEMENT (EM)  

Broader source: Energy.gov (indexed) [DOE]

MAINTENANCE (MT) MAINTENANCE (MT) OBJECTIVE MT.1 A program is in place to confirm and periodically reconfirm the condition and operability of equipment important to safety. This includes examination of records of tests and calibrations of equipment that satisfy safety basis requirements supporting the SST Facility activities. All equipment important to safety is currently operable and in satisfactory condition, or corrective/compensatory action is being taken. The LANL contractor has a system to maintain control of changes to equipment important to safety as required by the TSRs. (Core Requirements 1, 3, 6, 8, 9, and 14) Criteria * The operating organization has a program in place to maintain the equipment important to safety and a Master Equipment List has been developed, a

12

Environmental Management System `We are implementing an  

E-Print Network [OSTI]

Environmental Management System `We are implementing an Environmental Management System to address an Environmental Management System (EMS) which addresses all of the aspects of our business which have an impact Environmental Management System in all parts of our business. · Monitor and reduce our consumption of energy

13

Object Management Systems  

E-Print Network [OSTI]

Object-Oriented Database Management Systems for EngineeringR. Cassel. Distribution Management Systems: Functions and8-PWR 1988. Network Management Systems 52 Subodh Bapat.

Gollu, Aleks Ohannes

1995-01-01T23:59:59.000Z

14

Environmental Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts...

15

Environmental Management System Plan  

E-Print Network [OSTI]

R-3 • Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

16

EM Hosts Used Fuel Management Workshop | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Hosts Used Fuel Management Workshop Hosts Used Fuel Management Workshop EM Hosts Used Fuel Management Workshop September 30, 2013 - 12:00pm Addthis Participants in EM’s Office of Nuclear Materials Disposition workshop with Swedish executives gather for a photo. Participants in EM's Office of Nuclear Materials Disposition workshop with Swedish executives gather for a photo. WASHINGTON, D.C. - EM's Office of Nuclear Materials Disposition held a workshop with Swedish executives earlier this month to learn about their approaches to designing a national waste management program. EM officials met with representatives from SKB International, the consulting arm of SKB, the Swedish nuclear fuel and waste management company. They examined SKB's integrated waste management system, known as KBS-3, and the potential for efficiencies and lifecycle costs reductions

17

telecommunications system management  

Science Journals Connector (OSTI)

Communications system management applied to telecommunications systems, facilities, equipment, and components. See communications system , comm...

2001-01-01T23:59:59.000Z

18

EMS Description | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EMS Description EMS Description Environmental Management System Description (August 2014) Environmental Management System Description (August 2014) More Documents & Publications...

19

Earned Value Management System RM  

Broader source: Energy.gov (indexed) [DOE]

Earned Value Management System Review Module Earned Value Management System Review Module March 2010 CD-0 O Ea 0 OFFICE OF arned Va C CD-1 F ENVIRO Standard R alue Man Rev Critical Decis CD-2 M ONMENTAL Review Plan agement view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) t System e pplicability D-3 EMENT (EVMS) CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

20

Poneman Joins EM Contract and Project Management Workshop | Department of  

Broader source: Energy.gov (indexed) [DOE]

Poneman Joins EM Contract and Project Management Workshop Poneman Joins EM Contract and Project Management Workshop Poneman Joins EM Contract and Project Management Workshop June 7, 2013 - 12:00pm Addthis Deputy Secretary Daniel Poneman talks to participants in EM's Contract and Project Management Workshop this week. Deputy Secretary Daniel Poneman talks to participants in EM's Contract and Project Management Workshop this week. EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash discusses EM's current contract performance. EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash discusses EM's current contract performance. Deputy Secretary Daniel Poneman talks to participants in EM's Contract and Project Management Workshop this week. EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash discusses EM's current contract performance.

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Environmental Management (EM) Cleanup Projects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

2008-09-24T23:59:59.000Z

22

Environmental Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management System Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Managing our effects on the environment We are committed to protecting the environment while conducting our national security and energy-related missions. Laboratory Environmental Governing Policy What is the Environmental Management System? It covers every program in the Laboratory

23

Sandia National Laboratories, California Environmental Management System program manual.  

SciTech Connect (OSTI)

The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

Larsen, Barbara L.

2013-04-01T23:59:59.000Z

24

Software aspects of energy management systems  

SciTech Connect (OSTI)

This paper is intended to serve the need for an understanding of the role which software plays in energy management systems (EMS), and of the considerations involved in designing, implementing and maintaining such systems. The paper begins with a brief elementary examination of what software is and the types of basic functions it typically performs in EMS applications. Various aspects of EMS software are then explained and discussed, including software architecture, programming language, operating system, data base management, man-machine interface, application software, and communications. In addition to providing a tutorial on the composition and content of EMS software, the paper addresses several related questions, such as the reasons for choosing one programming language over another, the effect of system size on software factors, the extent to which off-the-shelf software components can and should be incorporated in EMS, and the relationship of software to the overall user interface with the systems.

Stinaff, R.D.

1983-06-01T23:59:59.000Z

25

Computerized Maintenance Management Systems  

Broader source: Energy.gov [DOE]

Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

26

EM Hosts Second Contract Performance and Management Workshop in 2012 |  

Broader source: Energy.gov (indexed) [DOE]

EM Hosts Second Contract Performance and Management Workshop in EM Hosts Second Contract Performance and Management Workshop in 2012 EM Hosts Second Contract Performance and Management Workshop in 2012 August 29, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM hosted its second Environmental Management Contract Performance and Management Workshop at DOE headquarters today. The goal of the workshop was to identify opportunities related to EM's goal to improve project, budget and contract management with the objective of delivering results on time, within cost and with world-class technical competencies. Participants in the workshop laid out steps to successfully implement opportunities identified to improve contract management at the first EM contract performance and management workshop held in February. In addition to DOE senior leadership, participants included corporate

27

Operating System Resource Management  

E-Print Network [OSTI]

Operating System Resource Management Date: Monday, September 27, 2010 Time: 2:00 ­ 3:00 pm Location allocation and de-allocation by an operating system of processor cores, memory pages, and various types constrained. This talk will propose a scheme for addressing the operating system resource management problem

28

Energy Management Systems  

E-Print Network [OSTI]

This presentation will address results from a pilot project with 10 chemical plants on energy management systems and the development of an energy efficiency plant certification program....

Ferland, K.

2007-01-01T23:59:59.000Z

29

Comprehensive Emergency Management System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes policy and assigns roles and responsibilities for the Department of Energy (DOE) Emergency Management System. Cancels DOE O 151.1B.

2005-11-02T23:59:59.000Z

30

Business System Management Review  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

P-004 Business System Management Review Process 11_0304Page 1 of 7 P-004 Business System Management Review Process 11_0304Page 1 of 7 EOTA - Business Process Document Title: Business System Management Review Process Document Number: P-004 Rev 11_0304 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): F-009, Business System Management Review Template P-004 Business System Management Review Process 11_0304Page 2 of 7 Revision History: Rev. Description of Change A Initial Release 08_0414 Corrective Actions, Preventive Actions, and Improvement Opportunity 09_1124 Edited document for clarity and to better fit the process in use. Added requirement to provide management with

31

MANAGEMENT CONTROL SYSTEM IN PUBLIC  

E-Print Network [OSTI]

1 MANAGEMENT CONTROL SYSTEM IN PUBLIC ADMINISTRATION: BEYOND RATIONAL MYTHS Nicolas Berland of practices around their management control systems. Despite some apparent failures, the implemented systems organizations have developed management control systems. Historically, these systems have been invented

Paris-Sud XI, Université de

32

Lawrence Livermore Site Office Manager Joins EM's Senior Leadership Team  

Broader source: Energy.gov (indexed) [DOE]

Lawrence Livermore Site Office Manager Joins EM's Senior Lawrence Livermore Site Office Manager Joins EM's Senior Leadership Team Lawrence Livermore Site Office Manager Joins EM's Senior Leadership Team November 9, 2011 - 12:00pm Addthis WASHINGTON, D.C. - EM Acting Assistant Secretary Dave Huizenga announced today that Alice Williams, manager of the DOE National Nuclear Security Administration (NNSA) Lawrence Livermore Site Office has joined the EM senior leadership team. "I am very excited to have Alice join EM Principal Deputy Assistant Secretary Tracy Mustin and I as we continue work toward the achievement of the EM vision and the continuing evolution of an EM organization that is focused on delivery of mission success to meet the nation's needs in the 21st century," Huizenga said. In ensuing months, Williams will work closely with Huizenga and Mustin as

33

Definition of Environmental Management (EM) Completion  

Broader source: Energy.gov (indexed) [DOE]

D D D e e f f i i n n i i t t i i o o n n o o f f E E M M C C o o m m p p l l e e t t i i o o n n a a n n d d D D O O E E S S i i t t e e C C l l o o s s u u r r e e This fact sheet defines critical points in the cleanup process, specifies where the Office of Environmental Management (EM) programmatic responsibility ends, and clarifies the responsibilities of other Program Secretarial Offices managing a site after EM's mission is complete. Accordingly, these definitions serve as the framework for developing or revising strategic plans, site baselines, and implementation plans. Environmental Management (Cleanup) includes those activities necessary to evaluate and mitigate a release or threat of release of a hazardous substance that may pose a risk to human health or the environment. Cleanup activities may include source term

34

EM Contributes Expertise to Comprehensive Resource on Managing Nuclear  

Broader source: Energy.gov (indexed) [DOE]

Contributes Expertise to Comprehensive Resource on Managing Contributes Expertise to Comprehensive Resource on Managing Nuclear Projects EM Contributes Expertise to Comprehensive Resource on Managing Nuclear Projects October 30, 2013 - 12:00pm Addthis EM officials wrote a chapter of this book, described as a valuable resource for project managers, plant managers, engineers, regulators, training professionals, consultants and academics. EM officials wrote a chapter of this book, described as a valuable resource for project managers, plant managers, engineers, regulators, training professionals, consultants and academics. WASHINGTON, D.C. - EM officials wrote a chapter of a recently published book, Managing Nuclear Projects - A Comprehensive Management Resource, which covers a range of areas with emphasis on process, requirements and

35

Definition of Environmental Management (EM) Completion | Department of  

Broader source: Energy.gov (indexed) [DOE]

Definition of Environmental Management (EM) Completion Definition of Environmental Management (EM) Completion Definition of Environmental Management (EM) Completion The purpose of this memorandum is to provide you with additional clarification on: 1) the specific activities that must be accomplished before an environmental cleanup project is complete; and 2) the specific activities that need to be accomplished before the Office of Environmental Management's (EM) responsibility for a site, or portions of a site, is complete. Definition of Environmental Management (EM) Completion More Documents & Publications EM SSAB Conference Calls - January 27, 2011 Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet

36

Managing the Management: CORBAbased Instrumentation of Management Systems  

E-Print Network [OSTI]

Management Team Department of Computer Science, TU MË? unchen Arcisstr. 21, D­80333 Munich, Germany akeller approach to this problem by defining a MIB for manage­ ment systems. It can be regarded as a step towardsManaging the Management: CORBA­based Instrumentation of Management Systems A. Keller Munich Network

37

The structure of energy management systems  

SciTech Connect (OSTI)

Energy management systems (EMS) which serve a variety of building functions are a complex combination of hardware and software. The design of the system is a trade-off between different characteristics including functions performed, number of connected points, cost, compatibility with other systems, reliability and flexibility. The functions performed by the EMS vary significantly with respect to complexity, interaction and rate of response required. The majority of functions interact either directly or indirectly with each other. The data required to support EMS functions can be classed as status, control, qualifying and informational. The amount of data required is extensive and must be brought together in many combinations to achieve the desired performance. The transfer of data is carried out by a communication system which connects the components of the EMS. The communication requirements, in addition to functional performance, are influenced by the application flexibility desired and the level of distribution of the system. Three general distribution levels are centralized, status and control decentralized, and functionally decentralized. The ability of the EMS of one manufacturer to interact effectively with EMS components or complete systems of other manufacturers is limited by the respective selections for data structures, communication methods and level of distribution. In general, the unique selection of characteristics chosen by each manufacturer precludes the integration of energy management system components of different manufacturers unless details of implementation are known.

Miller, D.E.

1983-06-01T23:59:59.000Z

38

EM Hosts Second Contract Performance and Management Workshop in 2012 |  

Broader source: Energy.gov (indexed) [DOE]

Second Contract Performance and Management Workshop in Second Contract Performance and Management Workshop in 2012 EM Hosts Second Contract Performance and Management Workshop in 2012 August 29, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM hosted its second Environmental Management Contract Performance and Management Workshop at DOE headquarters today. The goal of the workshop was to identify opportunities related to EM's goal to improve project, budget and contract management with the objective of delivering results on time, within cost and with world-class technical competencies. Participants in the workshop laid out steps to successfully implement opportunities identified to improve contract management at the first EM contract performance and management workshop held in February. In addition to DOE senior leadership, participants included corporate

39

Integrating Management Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mission Execution by Mission Execution by Integrating our Management Systems Integrating our Management Systems 1 W e e k l y O p e r a t i o n s M e e t i n g N o v e m b e r 1 , 2 0 1 1 M i c h a e l J . W e i s Pulling the Pieces Together for Improving DOE Management to Enable Mission Execution 2  Process changes Process changes  Behavioral changes Behavioral changes  System changes System changes Process Change Approach Strengthening and Expediting Decision Making 3 Proposed Outcomes Horizontal Integration Incoming DOE Business Crosscutting Issues (i.e. NLDC input) Hi-level Roadblocks Operations Management Council Associate Deputy Secretary Collaborative Action Process Chief Operating Officer Weekly Operations Council (OMC) Super 8 Secretary (ADS) (CAP) Board (COOB) p Meeting Endorsement / Commitment Super 8 US Meetings COO Meetings

40

Purge water management system  

DOE Patents [OSTI]

A purge water management system is described for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

Cardoso-Neto, J.E.; Williams, D.W.

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

awma.org october 2009 em 13Copyright 2009 Air & Waste Management Association em feature  

E-Print Network [OSTI]

awma.org october 2009 em 13Copyright 2009 Air & Waste Management Association em · feature by Doreen.orgCopyright 2009 Air & Waste Management Association The satellite observations provide constraints on detailed. In this article, we highlight the use of satellite data to constrain biomass burning emissions, to assess oxides

42

NIM (NERSC Information Management) system  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NERSC Information Management (NIM) portal The NERSC Information Management (NIM) system is a web portal used to view and modify user account, usage, and allocations information....

43

EM Hosts Contract Performance and Management Workshop | Department of  

Broader source: Energy.gov (indexed) [DOE]

Contract Performance and Management Workshop Contract Performance and Management Workshop EM Hosts Contract Performance and Management Workshop February 15, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM hosted the Environmental Management Contract Performance and Management Workshop at DOE headquarters Wednesday. The goal of the workshop was to identify opportunities to improve contract and project management with the objective of delivering results on time and within cost. In addition to DOE senior leadership, participants included corporate representatives from all EM large- and small-business prime cleanup and construction contractors. Deputy Secretary Daniel Poneman delivered the keynote address in a video message. Under Secretary for Nuclear Security Thomas D'Agostino attended the event. "Today's workshop with the corporate representatives provided an excellent

44

EM Hosts Contract Performance and Management Workshop | Department of  

Broader source: Energy.gov (indexed) [DOE]

Hosts Contract Performance and Management Workshop Hosts Contract Performance and Management Workshop EM Hosts Contract Performance and Management Workshop February 15, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM hosted the Environmental Management Contract Performance and Management Workshop at DOE headquarters Wednesday. The goal of the workshop was to identify opportunities to improve contract and project management with the objective of delivering results on time and within cost. In addition to DOE senior leadership, participants included corporate representatives from all EM large- and small-business prime cleanup and construction contractors. Deputy Secretary Daniel Poneman delivered the keynote address in a video message. Under Secretary for Nuclear Security Thomas D'Agostino attended the event. "Today's workshop with the corporate representatives provided an excellent

45

Energy management systems for commercial buildings. Final report  

SciTech Connect (OSTI)

Increasing costs of energy and the development of lower cost microelectronics have created a growing market for energy management systems applied to commercial buildings. This report examines the spectrum of EMS available and how they are used in different types of commercial buildings. An informal survey of 197 commercial building owners provided additional information on EMS installed and the energy savings attributed to those systems. Evaluations were performed to identify types of EMS appropriate to specific types of commercial buildings.

Woody, A.W.

1986-02-01T23:59:59.000Z

46

Power management system  

DOE Patents [OSTI]

A method of managing power resources for an electrical system of a vehicle may include identifying enabled power sources from among a plurality of power sources in electrical communication with the electrical system and calculating a threshold power value for the enabled power sources. A total power load placed on the electrical system by one or more power consumers may be measured. If the total power load exceeds the threshold power value, then a determination may be made as to whether one or more additional power sources is available from among the plurality of power sources. At least one of the one or more additional power sources may be enabled, if available.

Algrain, Marcelo C. (Peoria, IL); Johnson, Kris W. (Washington, IL); Akasam, Sivaprasad (Peoria, IL); Hoff, Brian D. (East Peoria, IL)

2007-10-02T23:59:59.000Z

47

Training Management Information System  

SciTech Connect (OSTI)

The Training Management Information System (TMIS) is an integrated information system for all training related activities. TMIS is at the leading edge of training information systems used in the nuclear industry. The database contains all the necessary records to confirm the department's adherence to accreditation criteria and houses all test questions, student records and information needed to evaluate the training process. The key to the TMIS system is that the impact of any change (i.e., procedure change, new equipment, safety incident in the commercial nuclear industry, etc.) can be tracked throughout the training process. This ensures the best training can be performed that meets the needs of the employees. TMIS is comprised of six functional areas: Job and Task Analysis, Training Materials Design and Development, Exam Management, Student Records/Scheduling, Evaluation, and Commitment Tracking. The system consists of a VAX 6320 Cluster with IBM and MacIntosh computers tied into an ethernet with the VAX. Other peripherals are also tied into the system: Exam Generation Stations to include mark sense readers for test grading, Production PC's for Desk-Top Publishing of Training Material, and PC Image Workstations. 5 figs.

Rackley, M.P.

1989-01-01T23:59:59.000Z

48

Report: EM Management Analysis and Strategic Vision-Casting  

Broader source: Energy.gov (indexed) [DOE]

Management Analysis and Strategic Vision-Casting Management Analysis and Strategic Vision-Casting September 25, 2008 Submitted by the EMAB Strategic Vision-Casting Subcommittee Background: In the course of developing the Environmental Management Advisory Board's (EMAB) fiscal year (FY) 2008 review topics, EM leadership and Board members recognized a need to re-examine the program's strategy and vision for the future, in order to better position EM and continue its momentum for clean-up and closure. This endeavor will also ensure that the next administration and current stakeholders are aligned with EM's proposed priorities, funding requirements, and commitments for 2009 and beyond. Consequently, the Board formed a Strategic Vision-Casting Subcommittee that was charged with the assignment of reviewing EM's current and past missions and strategic visions to assess

49

Environmental Compliance Management System  

SciTech Connect (OSTI)

Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy.

Brownson, L.W.; Krsul, T.; Peralta, R.A. [Argonne National Lab., Idaho Falls, ID (United States); Knudson, D.A.; Rosignolo, C.L. [Argonne National Lab., IL (United States)

1992-09-01T23:59:59.000Z

50

The electricity consumption impacts of commercial energy management systems  

SciTech Connect (OSTI)

An investigation of energy management systems (EMS) in large commercial and institutional buildings in North Carolina was undertaken to determine how EMS currently affect electricity consumption and what their potential is for being used to reduce on-peak electricity demand. A survey was mailed to 5000 commercial customers; the 430 responses were tabulated and analyzed; EMS vendors were interviewed, and 30 sites were investigated in detail. The detailed assessments included a site interview and reconstruction of historic billing data to evaluate EMS impact, if any. The results indicate that well-tuned EMS can result in a 10 to 40 percent reduction in billed demand, and smaller reductions in energy.

Buchanan, S.; Taylor, R.; Paulos, S.; Warren, W.; Hay, J.

1989-02-01T23:59:59.000Z

51

Line Management Perspective: Office of Environmental Management (EM)  

Broader source: Energy.gov [DOE]

Slide Presentation by Matthew Moury, Deputy Assistant Secretary for Safety, Security and Quality Programs, Office of Environmental Management. EFCOG Integrated Safety Management Work Planning and Control.

52

SES Performance Management System Plan Training | Department...  

Broader source: Energy.gov (indexed) [DOE]

Management System Plan Training SES Performance Management System Plan Training Overview of the DOE SES Performance Management System. Senior Executive Service Performance...

53

Mobile Traffic Management System Test Deployment  

E-Print Network [OSTI]

BERKELEY Mobile Traf?c Management System Test DeploymentHIGHWAYS MOBILE TRAFFIC MANAGEMENT SYSTEM TEST DEPLOYMENTMobile Transportation Management System (MTMS). This new and

Gerfen, Jeffrey Brian

2005-01-01T23:59:59.000Z

54

PIA - Human Resources Management Information System (HRMIS) ...  

Energy Savers [EERE]

Information System (HRMIS) PIA - Human Resources Management Information System (HRMIS) PIA - Human Resources Management Information System (HRMIS) PIA - Human Resources Management...

55

Rule-Based Energy Management System Applied to Large Industrial Facilities  

E-Print Network [OSTI]

Deregulation of electricity and rising fuel costs are causing renewed interest in Energy Management Systems (EMS). This paper details the results of integrating a rule-based EMS controller at a Pulp and Paper Mill and additional findings from...

Gauthier, M.; Childress, R. L.

56

Earned Value Management System (EVMS)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide supports the Departments initiatives to improve program, project, and contract management through the implementation and surveillance of contractors earned value management systems. Canceled by DOE G 413.3-10A.

2008-05-06T23:59:59.000Z

57

HIERARCHICAL MANAGEMENT OF BATTLEFIELD NETWORKS WITH THE SHAMAN MANAGEMENT SYSTEM  

E-Print Network [OSTI]

HIERARCHICAL MANAGEMENT OF BATTLEFIELD NETWORKS WITH THE SHAMAN MANAGEMENT SYSTEM Adarshpal S with a description of the SHAMAN system and briefly introduces its applica- tions to the management of tactical for MANagement). This management system developed at the Network Management Laboratory of the Univer- sity

Sethi, Adarshpal

58

Cryptographic Key Management System  

SciTech Connect (OSTI)

This report summarizes the outcome of U.S. Department of Energy (DOE) contract DE-OE0000543, requesting the design of a Cryptographic Key Management System (CKMS) for the secure management of cryptographic keys for the energy sector infrastructure. Prime contractor Sypris Electronics, in collaboration with Oak Ridge National Laboratories (ORNL), Electric Power Research Institute (EPRI), Valicore Technologies, and Purdue University's Center for Education and Research in Information Assurance and Security (CERIAS) and Smart Meter Integration Laboratory (SMIL), has designed, developed and evaluated the CKMS solution. We provide an overview of the project in Section 3, review the core contributions of all contractors in Section 4, and discuss bene#12;ts to the DOE in Section 5. In Section 6 we describe the technical construction of the CKMS solution, and review its key contributions in Section 6.9. Section 7 describes the evaluation and demonstration of the CKMS solution in different environments. We summarize the key project objectives in Section 8, list publications resulting from the project in Section 9, and conclude with a discussion on commercialization in Section 10 and future work in Section 11.

No, author

2014-02-21T23:59:59.000Z

59

The configuration management program for the Emergency Management Support System  

SciTech Connect (OSTI)

Emergency response software is used increasingly by the US Department of Energy's (DOE's) Emergency Management Project (EMP) personnel at Hanford Site. This software must be reliable, of high quality, and capable of performing critical functions to support assessment of actual or potential consequences of any hazardous accidents onsite or events having potential offsite impacts. To better control the software and ensure its suitability for use as a tool to protect employees, the public, and environment, a method for specifying and certifying its capabilities and documenting its development and implementation was needed. A team of EMP staff, composed of personnel from Pacific Northwest Laboratory (PNL) and Boeing Computer Services- Richland (BCSR) under the direction of PNL EMP, responded to this need by developing a software configuration management program (CMP). This report documents the development of the CMP, including the strategies upon which the CMP is based, and describes the program as it has been implemented for EMS System software. The program relies on the integration of its three primary elements: the configuration management staff, tools, and process. Configuration management staff run the program, using specially designed configuration management forms to guide, document, and track the life cycle of the software. The configuration management process itself is reflected in the instructive forms and summarized in flowcharts representing each phase of the process -- from requirements specification through implementation and maintenance. 7 refs., 9 figs., 1 tab.

Probasco, K M [Pacific Northwest Lab., Richland, WA (United States); Stephan, E G [Boeing Computer Services Co., Richland, WA (United States)

1991-08-01T23:59:59.000Z

60

Automated Transportation Management System (ATMS) | Department...  

Office of Environmental Management (EM)

of Energy's (DOE's) Automated Transportation Management System is an integrated web-based logistics management system allowing users to manage inbound and outbound freight...

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Knowledge Management and Assistance Systems  

E-Print Network [OSTI]

1 1 Knowledge Management and Assistance Systems Bernd Neumann WS 2007/08 2 Topics Introduction Applications of Knowledge-based Systems Role of Knowledge Management Knowledge Representation Techniques Semantic Networks Relational Structures Frame-based Knowledge Representation Rule-based Systems Case

Hamburg,.Universität

62

Environmental Management System Plan  

E-Print Network [OSTI]

management Water conservation LBNL’s approach to sustainable environmentalWater Discharges) of Introduction Environmental Managementenvironmental compliance programs, such as air and water quality, as well as less traditional programs, such as wildland fire management,

Fox, Robert

2009-01-01T23:59:59.000Z

63

Legal Management Tracking System Page  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Legal Management Tracking System Page 1 of 1 Back to Case Costs Contractor Litigation - Law Firm Invoices Office: Richland Operations Office Parties: DWAYNE HALL v. FLUOR HANFORD,...

64

System for Award Management (SAM):  

Energy Savers [EERE]

System for Award Management (SAM) ChallengeHER Opportunities for Women in Federal Contracting May 23, 2013 Judith R. Zawatsky General Services Administration You are here today...

65

Earned Value Management System (EVMS)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides approaches for implementing the Earned Value Management System (EVMS) requirements of DOE O 413.3B. Cancels DOE G 413.3-10.

2012-03-13T23:59:59.000Z

66

Status Report: EM Acquisition and Project Management Review  

Broader source: Energy.gov (indexed) [DOE]

Report: Acquisition and Project Report: Acquisition and Project Management Review August 15, 2006 Submitted by: Mr. James Ajello and Mr. Dennis Ferrigno Background: The Environmental Management Advisory Board is in the process of providing Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management (EM-50), records of past EMAB recommendations and commentary. Mr. Ajello and Mr. Ferrigno believe that the records will be helpful to Mr. Surash and his staff. EMAB has identified the following actionable items: Provide Mr. Surash with EMAB committee files for review Have Mr. Ferrigno contact Mr. Surash to arrange a meeting for discussion of said materials Have Mr. Ajello and Mr. Ferrigno meet with Mr. Surash periodically to discuss project management and contract issues, as per request of EM-1.

67

EM Focuses on Contract, Project Management Improvements in Three-Day  

Broader source: Energy.gov (indexed) [DOE]

EM Focuses on Contract, Project Management Improvements in EM Focuses on Contract, Project Management Improvements in Three-Day Workshop EM Focuses on Contract, Project Management Improvements in Three-Day Workshop March 1, 2012 - 12:00pm Addthis ORLANDO, Fla. - EM held a three-day workshop in Orlando this month focusing on strategies to improve contract and project management across the EM complex. More than 100 EM employees attended the 2012 Contract and Project Management Workshop for a series of briefings and working sessions by dozens of EM leaders, including federal procurement and project directors. The event, held March 20-22, was hosted by EM's Office of Acquisition and Project Management. "There was a wide range of discussions on many aspects of contract and project management for our acquisition professionals throughout EM, as well

68

Sandia National Laboratories, California Environmental Management System Program Manual.  

SciTech Connect (OSTI)

The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

Not Available

2009-04-01T23:59:59.000Z

69

Sandia National Laboratories, California Environmental Management System Program Manual.  

SciTech Connect (OSTI)

The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

Larsen, Barbara L.

2011-04-01T23:59:59.000Z

70

INL's Environmental Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and minimize environmental impacts throughout the lifecycle of INL facilities and operations. Conduct all activities and manage hazardous and radioactive materials and...

71

Environmental remediation and waste management information systems  

SciTech Connect (OSTI)

The purpose of this paper is to document a few of the many environmental information systems that currently exist worldwide. The paper is not meant to be a comprehensive list; merely a discussion of a few of the more technical environmental database systems that are available. Regulatory databases such as US Environmental Protection Agency`s (EPA`s) RODS (Records of Decision System) database [EPA, 1993] and cost databases such as EPA`s CORA (Cost of Remedial Action) database [EPA, 1993] are not included in this paper. Section 2 describes several US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) information systems and databases. Section 3 discusses several US EPA information systems on waste sites and technologies. Section 4 summarizes a few of the European Community environmental information systems, networks, and clearinghouses. And finally, Section 5 provides a brief overview of Geographical Information Systems. Section 6 contains the references, and the Appendices contain supporting information.

Harrington, M.W.; Harlan, C.P.

1993-12-31T23:59:59.000Z

72

Project Management vs. Systems Engineering Management: A Practitioners' View on  

E-Print Network [OSTI]

Project Management vs. Systems Engineering Management: A Practitioners' View on IntegratingPROJECT MANAGEMENT VS. SYSTEMS ENGINEERING MANAGEMENT Received 3 August 2010; Revised 18 December 2010 (wileyonlinelibrary.com). DOI 10.1002/sys.20187 ABSTRACT While most Systems Engineering Management (SEM) applications

de Weck, Olivier L.

73

A user interface management system  

Science Journals Connector (OSTI)

The design and construction of the user interface to interactive systems is receiving increased attention. This paper describes a user interface management system that allows a designer/developer to focus on the logical functionality of an application ... Keywords: User interface management

David J. Kasik

1982-07-01T23:59:59.000Z

74

Fuel cell gas management system  

DOE Patents [OSTI]

A fuel cell gas management system including a cathode humidification system for transferring latent and sensible heat from an exhaust stream to the cathode inlet stream of the fuel cell; an anode humidity retention system for maintaining the total enthalpy of the anode stream exiting the fuel cell equal to the total enthalpy of the anode inlet stream; and a cooling water management system having segregated deionized water and cooling water loops interconnected by means of a brazed plate heat exchanger.

DuBose, Ronald Arthur (Marietta, GA)

2000-01-11T23:59:59.000Z

75

Business System Management Review Template  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

F-009 Business System Management Review Template 09_0519 Page 1 of 12 F-009 Business System Management Review Template 09_0519 Page 1 of 12 Company - Business Form Document Title: Business System Management Review Template Document Number: F-009 Rev. 11_0628 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-004, Business System Management Review Notify of Changes: QAM, MGT Referenced Document(s): N/A F-009 Business System Management Review Template 09_0519 Page 2 of 12 Revision History: Rev. Description of Change A Initial Release 09_0519 Format changes made to template (in particular Section 7.0 CAR/PAR/IO reporting) and several edits for clarification and ease of reading. 11_0628 Modified template categories to reflect current process

76

Building-Level Energy Management Systems (BLEMS) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Emerging Technologies » Building-Level Energy Management Systems Emerging Technologies » Building-Level Energy Management Systems (BLEMS) Building-Level Energy Management Systems (BLEMS) The U.S. Department of Energy (DOE) is currently conducting research into building-level energy management systems (BLEMS). Project Description BLEMS provide an integrated plug-and-play capability for legacy energy management systems (EMSs), such as those based on X-10, Zigbee, 802.15, and newly developed EMS for buildings of any size. Project Partners Research is being undertaken by DOE, the University of Southern California, General Electric (GE) Global Research, and GE Consumer & Industrial Division. Project Goals The goal of this project is to develop practical solutions that bring together ad-hoc legacy energy management systems under a single, unified

77

Safety Management System Policy  

Broader source: Energy.gov (indexed) [DOE]

POLICY POLICY Washington, D.C. Approved: 4-25-11 SUBJECT: INTEGRATED SAFETY MANAGEMENT POLICY PURPOSE AND SCOPE To establish the Department of Energy's (DOE) expectation for safety, 1 including integrated safety management that will enable the Department's mission goals to be accomplished efficiently while ensuring safe operations at all departmental facilities and activities. This Policy cancels and supersedes DOE Policy (P) 411.1, Safety Management Functions, Responsibilities, and Authorities Policy, dated 1-28-97; DOE P 441.1, DOE Radiological Health and Safety Policy, dated 4-26-96; DOE P 450.2A, Identifying, Implementing and Complying with Environment, Safety and Health Requirements, dated 5-15-96; DOE P 450.4, Safety Management

78

Federal Energy Management Program: Metering Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Metering Systems Metering Systems to someone by E-mail Share Federal Energy Management Program: Metering Systems on Facebook Tweet about Federal Energy Management Program: Metering Systems on Twitter Bookmark Federal Energy Management Program: Metering Systems on Google Bookmark Federal Energy Management Program: Metering Systems on Delicious Rank Federal Energy Management Program: Metering Systems on Digg Find More places to share Federal Energy Management Program: Metering Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Systems Approaches Process Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources Contacts Greenhouse Gases Water Efficiency

79

EM Focuses on Contract, Project Management Improvements in Three-Day  

Broader source: Energy.gov (indexed) [DOE]

Focuses on Contract, Project Management Improvements in Focuses on Contract, Project Management Improvements in Three-Day Workshop EM Focuses on Contract, Project Management Improvements in Three-Day Workshop March 1, 2012 - 12:00pm Addthis ORLANDO, Fla. - EM held a three-day workshop in Orlando this month focusing on strategies to improve contract and project management across the EM complex. More than 100 EM employees attended the 2012 Contract and Project Management Workshop for a series of briefings and working sessions by dozens of EM leaders, including federal procurement and project directors. The event, held March 20-22, was hosted by EM's Office of Acquisition and Project Management. "There was a wide range of discussions on many aspects of contract and project management for our acquisition professionals throughout EM, as well

80

Towards CORBAbased Enterprise Management: Managing CORBAbased Systems with SNMP Platforms  

E-Print Network [OSTI]

1 Towards CORBA­based Enterprise Management: Managing CORBA­based Systems with SNMP Platforms are in widespread use. The consen­ sus on the advantages of CORBA for managing complex system infrastuctures distributed object environments. Keywords--- CORBA, Enterprise Management, SNMP Platforms, Distributed Systems

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Special Nuclear Materials: EM Manages Plutonium, Highly Enriched Uranium  

Broader source: Energy.gov (indexed) [DOE]

Nuclear Materials & Waste » Nuclear Materials & Waste » Special Nuclear Materials: EM Manages Plutonium, Highly Enriched Uranium and Uranium-233 Special Nuclear Materials: EM Manages Plutonium, Highly Enriched Uranium and Uranium-233 105-K building houses the K-Area Material Storage (KAMS) facility, designated for the consolidated storage of surplus plutonium at Savannah River Site pending disposition. The plutonium shipped to KAMS is sealed inside a welded 3013 containers that are nested in 9975 shipping containers. 105-K building houses the K-Area Material Storage (KAMS) facility, designated for the consolidated storage of surplus plutonium at Savannah River Site pending disposition. The plutonium shipped to KAMS is sealed inside a welded 3013 containers that are nested in 9975 shipping

82

Environmental Restoration and Waste Management (EM) program: An introduction  

SciTech Connect (OSTI)

This booklet introduces the reader to the mission and functions of a major new unit within the US Department of Energy (DOE): the Office of Environmental Restoration and Waste Management (EM). The Secretary of Energy established EM in November 1989, implementing a central purpose of DOE's first annual Environmental Restoration and Waste Management Five-Year Plan, which had appeared three months earlier. The contents of this booklet, and their arrangement, reflect the annual update of the Five-Year Plan. The Five-Year Plan supports DOE's strategy for meeting its 30-year compliance and cleanup goal. This strategy involves: focusing DOE's activities on eliminating or reducing known or recognized potential risks to worker and public health and the environment, containing or isolating, removing, or detoxifying onsite and offsite contamination, and developing technology to achieve DOE's environmental goals.

Not Available

1990-12-01T23:59:59.000Z

83

Energy Management and Information Systems  

E-Print Network [OSTI]

?infrastructure energy?audits,?HVAC?upgrades,? heat?recovery,?etc. Improve?operations processes?and?day?to?day? operations,?retro? commissioning ENERGY?MANAGEMENT?INFORMATION?SYSTEM the?project Hardware ? $3.0?million?investment ? 400+?meters...

Conraud, J.

2013-01-01T23:59:59.000Z

84

Integrated Safety Management System Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This manual provides requirements and guidance for DOE and contractors to ensure development and implementation of an effective Integrated Safety Management system that is periodically reviewed and continuously improved. Canceled by DOE O 450.2.

2006-11-01T23:59:59.000Z

85

Environmental Management System Steering Committee | The Ames...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Management System Steering Committee The Environmental Management System Steering Committee (EMSSC) is a standing Ames Laboratory committee that advises the members...

86

Civilian Radioactive Waste Management System Requirements Document...  

Office of Environmental Management (EM)

Civilian Radioactive Waste Management System Requirements Document Civilian Radioactive Waste Management System Requirements Document This document specifies the top-level...

87

Nuclear Materials Management & Safeguards System | National Nuclear...  

National Nuclear Security Administration (NNSA)

System Nuclear Materials Management & Safeguards System NMMSS U.S. Department of Energy U.S. Nuclear Regulatory Commission Nuclear Materials Management & Safeguards...

88

Energy Management System Implementation ? Do and Check  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

in management systems * DOE pilots in Northwest, Midwest, and California * Online web tools for energy management system implementation Who are we? Dorothy Fisher Atwood WC...

89

EM-PDRI Manual  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL MANAGEMENT ENVIRONMENTAL MANAGEMENT PROJECT DEFINITION RATING INDEX (EM*PDRI) MANUAL OFFICE OF PROJECT MANAGEMENT, EM-6 U.S. DEPARTMENT OF ENERGY FEBRUARY 2001 REVISION 1 EM*PDRI MANUAL FEBRUARY 2001 TABLE OF CONTENTS 1.0 Introduction/EM*PDRI Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2.0 EM*PDRI Description/Development of Scoring System . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.1 EM*PDRI Rating Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.2 Rating Element Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.3 EM*PDRI Maturity Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2.4 EM*PDRI Scoring Methodology (Scoring the Project) . . . . . . . . . . . . . . . . . . . . . 4 2.4.1 Scoring System Bases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.4.2 Project Score . . . . . . . . . . .

90

System for Award Management (SAM):  

Broader source: Energy.gov (indexed) [DOE]

System for Award Management (SAM) System for Award Management (SAM) ChallengeHER Opportunities for Women in Federal Contracting May 23, 2013 Judith R. Zawatsky General Services Administration You are here today because you want to: a) Get a contract with the federal government b) Get a grant from the federal government c) Increase the work you are already doing with the federal government d) Learn new acronyms WHERE DO YOU START? www.sam.gov WHAT IS SAM? The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of * Central Contractor Registry (CCR) * Online Representations & Certifications Application (ORCA) * Excluded Parties List System (EPLS) WHAT DO I NEED TO DO? Create User Account Register or Update Entity Get contracts/grants

91

MIT System Design and Management Program  

E-Print Network [OSTI]

MIT System Design and Management Program MIT System Design and Management Program Leadership, innovation, systems thinking #12;MIT System Design and Management Program #12;about MIT The mission of MIT of leaders, MIT's System Design and Management Program (SDM) educates mid-career technical professionals

de Weck, Olivier L.

92

A 17025:2005A 17025:2005 Management SystemManagement System  

E-Print Network [OSTI]

A 17025:2005A 17025:2005 Management SystemManagement System Made SimpleMade Simple What to think about when reviewingWhat to think about when reviewing the Management Systemthe Management System #12 to have Technical expertise?expertise? #12;4 Management SystemManagement System OwnershipOwnership It

93

CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM 1998 SITE ENVIRONMENTAL REPORT2-1  

E-Print Network [OSTI]

CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM 1998 SITE ENVIRONMENTAL REPORT2-1 2 Environmental an improved Environmental Management System (EMS) to ensure that it operates in an environmentally responsible of Energy 1998 Energy Management Achievement Award for water conservation efforts. Wa- ter conservation

94

Revised June 2014 Training Management System (TMS)  

E-Print Network [OSTI]

Revised June 2014 Training Management System (TMS) User Manual Contents Accessing the TMS.................................................................................................................15 #12;2 Accessing the TMS Before accessing the Training Management System you must know your Harvard...........................................................................................................................................2 Training Director, Training Manager, and Course Director Access

Heller, Eric

95

Battery Thermal Management System Design Modeling (Presentation)  

SciTech Connect (OSTI)

Presents the objectives and motivations for a battery thermal management vehicle system design study.

Kim, G-H.; Pesaran, A.

2006-10-01T23:59:59.000Z

96

WIMS - Waste Information Management System  

Office of Environmental Management (EM)

Welcome To WIMS Welcome To WIMS Waste Information Management System WIMS new web address: http://www.emwims.org WIMS is developed to provide DOE Headquarters and site waste managers with the tools necessary to easily visualize, understand, and manage the vast volumes, categories, and problems of forecasted waste streams. WIMS meets this need by providing a user-friendly online system to gather, organize, and present waste forecast data from DOE sites. This system provides a method for identification of waste forecast volumes, material classes, disposition pathways, and potential choke points and barriers to final disposition. Disclaimer: Disposition facility information presented is for planning purposes only and does not represent DOE's decisions or commitments. Any selection of disposition facility will be made after technical, economic, and policy considerations.

97

Building Technologies Office: Integrated Building Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Integrated Building Integrated Building Management System Research Project to someone by E-mail Share Building Technologies Office: Integrated Building Management System Research Project on Facebook Tweet about Building Technologies Office: Integrated Building Management System Research Project on Twitter Bookmark Building Technologies Office: Integrated Building Management System Research Project on Google Bookmark Building Technologies Office: Integrated Building Management System Research Project on Delicious Rank Building Technologies Office: Integrated Building Management System Research Project on Digg Find More places to share Building Technologies Office: Integrated Building Management System Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE

98

Safety Management System Policy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Program Management » Safety » Safety Management Services » Program Management » Safety » Safety Management System Policy Safety Management System Policy Safety Management Systems provide a formal, organized process whereby people plan, perform, assess, and improve the safe conduct of work. The Safety Management System is institutionalized through Department of Energy (DOE) directives and contracts to establish the Department-wide safety management objective, guiding principles, and functions. The DOE safety management system consists of six components: Objective Guiding principles Core functions Mechanisms Responsibilities Implementation Safety Management System Policy More Documents & Publications "DOE O 450.2 INTEGRATED SAFETY MANAGEMENT AND DOE P 450.4A INTEGRATED SAFETY MANAGEMENT POLICY FAMILIAR LEVEL

99

EM Safely and Efficiently Manages Spent Nuclear Fuel | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Waste Management » Nuclear Materials & Waste » EM Services » Waste Management » Nuclear Materials & Waste » EM Safely and Efficiently Manages Spent Nuclear Fuel EM Safely and Efficiently Manages Spent Nuclear Fuel Dry storage casks at Idaho National Laboratory can safely house spent nuclear fuel for decades. Dry storage casks at Idaho National Laboratory can safely house spent nuclear fuel for decades. EM's mission is to safely and efficiently manage its spent nuclear fuel and prepare it for disposal in a geologic repository. Previously, the Office of Environmental Management's (EM) mission had included the safe and efficient management of its spent nuclear fuel (SNF) and preparation for its disposal in a geologic repository. However, in May 2009, the planned geologic repository at Yucca Mountain was cancelled. The

100

Model-based integrated management: applying autonomic systems engineering to network and systems management  

Science Journals Connector (OSTI)

We present a novel approach for integrated management of networks and information systems, based on the specification of executable behaviour models. A model processing plane is introduced, consisting of a number of processing units that together form ... Keywords: ASE, autonomic systems, autonomic systems engineering, behaviour modelling, information systems, management integration, model transformation, model-based integrated management, network management, systems management

Edzard Hofig; Peter H. Deussen

2011-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

EM Prepares Report for Convention on Safety of Spent Fuel and Radioactive Waste Management  

Broader source: Energy.gov [DOE]

WASHINGTON, D.C. – EM supported DOE in its role as the lead technical agency to produce a report recently for the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management.

102

Using the CIM Conceptualization in Autonomic System Management: the System Management Ontology Project  

E-Print Network [OSTI]

Using the CIM Conceptualization in Autonomic System Management: the System Management Ontology management domain. This conceptualization layer, or ontology, would provide the appropriate vocabulary across multiple organizations. The CIM standard #12;schemas, on which system databases on CIM

Calvanese, Diego

103

Products in environmental management systems: the role of auditors  

Science Journals Connector (OSTI)

For standardized environmental management systems (EMS) to be environmentally effective tools, they should affect important environmental aspects related to flows of materials and energy, which for manufacturing companies are closely connected to their products. This paper presents how external environmental auditors interpret and apply important product-related requirements of ISO 14001 at manufacturing companies in Sweden. The results indicate that the link between EMS and products is rather weak. Products are seldom regarded as significant environmental aspects and are therefore not within the main scope of many EMS, which are mainly focused on sites. However, all of the interviewed auditors require that some kind of environmental considerations be incorporated into product development, but these considerations are to large extent site oriented; how they are prioritized in relation to other factors such as economics and other customer priorities appears to be up to the companies. The paper includes some recommendations to strengthen the role of products within the framework of standardized EMS.

Jonas Ammenberg; Erik Sundin

2005-01-01T23:59:59.000Z

104

DOCS System Configuration Management Plan | Department of Energy  

Energy Savers [EERE]

DOCS System Configuration Management Plan DOCS System Configuration Management Plan The DOCS Systems Configuration Management Plan (SCMP), from an actual DOE systems engineering...

105

Integrated Vehicle Thermal Management Systems (VTMS) Analysis...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Integrated Vehicle Thermal Management Power Electronic Thermal System Performance and Integration Characterization and Development of Advanced Heat Transfer Technologies...

106

Automated Transportation Management System (ATMS)  

Broader source: Energy.gov (indexed) [DOE]

Re evised June 2010 Re evised June 2010 Autom The Depa Transport an integra system al outbound air. Its ea 1989 DOE significant operationa commerce electronic rates, pre transporta users eva shipments opportunit logistics im ATMS is i radioactiv shipments System ATMS is a activities p packaging including materials. common s lading, fre * W * C S * A * H * E * * O 0 mated T artment of Ene tation Manage ated web-base lowing users freight shipm arly developm E Inspector G t opportunitie al efficiency t e. Today's sy cally prepare s pare shipping ation bills befo aluate carrier s, and use co ties for system mprovements ts capability t ve and other h s in a comple Modules a modular sys performed by g and transpo radioactive a . Its modules shipment info eight bills, rate System Web Applic Carrier Eval Selection Automated

107

COURSE PROGRAM MANAGEMENT OF EDUCATIONAL SYSTEMS  

E-Print Network [OSTI]

1 « » COURSE PROGRAM MANAGEMENT OF EDUCATIONAL SYSTEMS Author : O. Mashkina, Ph.D. 1 and processes in education management. In current circumstances, a priority of the national educational system features of the education system management in the modern environment; - lay the theoretic

Kaplan, Alexander

108

Traffic Management System Performance November 11, 2002  

E-Print Network [OSTI]

Traffic Management System Performance November 11, 2002 David Levinson1 Wei Chen2 Department uses regression analysis to evaluate long-run traffic management system performance. Three important traffic management systems in the Twin Cities metro area - Ramp Metering, Variable Message Signs (VMS

Levinson, David M.

109

EM threat analysis for wireless systems.  

SciTech Connect (OSTI)

Modern digital radio systems are complex and must be carefully designed, especially when expected to operate in harsh propagation environments. The ability to accurately predict the effects of propagation on wireless radio performance could lead to more efficient radio designs as well as the ability to perform vulnerability analyses before and after system deployment. In this report, the authors--experts in electromagnetic (EM) modeling and wireless communication theory--describe the construction of a simulation environment that is capable of quantifying the effects of wireless propagation on the performance of digital communication.

Burkholder, R. J. (Ohio State University Electroscience Laboratory); Mariano, Robert J.; Schniter, P. (Ohio State University Electroscience Laboratory); Gupta, I. J. (Ohio State University Electroscience Laboratory)

2006-06-01T23:59:59.000Z

110

Sandia National Laboratories: Carbon Management Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management Systems Models Publications Questions WECSsim Model The Water, Energy and Carbon Sequestration Model (WECSsim): A Collaborative Systems Model The Water, Energy and...

111

PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE...  

Energy Savers [EERE]

SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS...

112

Definition: Distribution Management System | Open Energy Information  

Open Energy Info (EERE)

Management System Management System Jump to: navigation, search Dictionary.png Distribution Management System A Distribution Management System (DMS) is a utility IT system capable of collecting, organizing, displaying and analyzing real-time or near real-time electric distribution system information. A DMS can also allow operators to plan and execute complex distribution system operations in order to increase system efficiency, optimize power flows, and prevent overloads. A DMS can interface with other operations applications such as geographic information systems (GIS), outage management systems (OMS), and customer information systems (CIS) to create an integrated view of distribution operations.[1] View on Wikipedia Wikipedia Definition In the recent years, utilization of electrical energy increased

113

Earned Value Management System (EVMS) - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0A, Earned Value Management System (EVMS) by Rick Blaisdell Functional areas: Capital Assets, Contract Management, Program Management, Project Management This Guide provides...

114

EM ARRA Best Practices and Lessons Learned Workshop: Field Manager's Top Issues  

Broader source: Energy.gov (indexed) [DOE]

EM ARRA BEST PRACTICES and LESSONS LEARNED WORKSHOP Waste Management Symposium Phoenix, AZ March 1, 2012 www.em.doe.gov 2 Field Manager's Top Issues Strategic Direction/Programmatic Decisions - Make remaining programmatic decisions so field can implement in expedited and efficient manner Streamline Requirements - Reduce reporting and new requirements from HQ to field Delegate to Field - Provide more tactical decision making to the field in the area of contracts, AE, and execution year budget decisions www.em.doe.gov 3 Field Manager's Top Issues Strategic Direction/Programmatic Decisions - Make remaining programmatic decisions so field can implement in expedited and efficient manner. Examples:

115

PPPL Project Management System Page 1 of 111 PPPL Project Management System Description Rev-01  

E-Print Network [OSTI]

). Incorporated PMSD supporting procedures as sub- procedures in a new Appendix E. #12;PPPL Project ManagementPPPL Project Management System Page 1 of 111 PPPL Project Management System Description Rev-01 Project Management System Description (PMSD) Revision 1 June 2011 Prepared by

Princeton Plasma Physics Laboratory

116

Appendix 1 -Additional iManage Systems  

Broader source: Energy.gov (indexed) [DOE]

- Additional iManage/Corporate Information Systems - Additional iManage/Corporate Information Systems In addition to STARS, STRIPES, IDW/iPortal, these are corporate systems maintained by the Office of Corporate Information Systems. These systems are currently not included as part of the requirements. Application/Project Automated Time and Attendance (ATAAPS) Budget and Reporting Code System (BARC) Budget Table System (BTS) Consent Order Tracking System (COTS) Consolidated Accounting and Investment System (CAIS) Departmental Audit Report Tracking System (DARTS) - Enhancements Departmental Audit Report Tracking System (DARTS) - Existing Departmental Inventory Management System (DIMS) DOEInfo eMailList ePerformance eRooms (Pensions) External CFO Website Folio (Portfolio Management) Funds Distribution System (FDS)

117

PRESENTATION: OVERVIEW OF DOE OFFICE OF ENVIRONMENTAL MANAGEMENT (EM)  

Broader source: Energy.gov [DOE]

A briefing to the SEAB Task Force on Technology Development for Environmental Management on the DOE Ofiice of Environmental Management

118

Information Systems Management (ISM) 2011 Department of Supply Chain & Information Systems  

E-Print Network [OSTI]

Information Systems Management (ISM) 2011 Department of Supply Chain & Information Systems Information Systems Management Minor Application Overview The Information Systems Management focuses Systems Management and Applications c. MIS 431 (3) Business Data Management d. MIS 446 (3) Information

Yener, Aylin

119

Architecting dependable systems with proactive fault management  

Science Journals Connector (OSTI)

Management of an ever-growing complexity of computing systems is an everlasting challenge for computer system engineers. We argue that we need to resort to predictive technologies in order to harness the system's complexity and transform a vision of ...

Felix Salfner; Miroslaw Malek

2010-01-01T23:59:59.000Z

120

DOE Order Self Study Modules - DOE O 151.1C Comprehensive Emergency Management System  

Broader source: Energy.gov (indexed) [DOE]

O 151.1C O 151.1C COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM NATIONAL NUCLEAR SECURITY ADMINISTRATION SERVICE CENTER Change No: 3 DOE O 151.1C Level: Familiar Date: 12/1/08 1 DOE O 151.1C COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources listed below, you will be able to: 1. List the objectives of DOE O 151.1C, Comprehensive Emergency Management System (EMS); 2. Describe the responsibilities assigned to the following positions or groups for implementation and management of the EMS: Cognizant/field element managers Site/facility managers 3. State the purpose of a hazard survey; 4. List three phases of the planning process that should be addressed in an

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Environmental Management Systems (Iowa) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Management Systems (Iowa) Environmental Management Systems (Iowa) Environmental Management Systems (Iowa) < Back Eligibility Local Government Municipal/Public Utility Tribal Government Program Info State Iowa Program Type Environmental Regulations Fees Training/Technical Assistance Siting and Permitting Provider Iowa Department of Natural Resources A solid waste planning area (e.g., the land encompassed by a municipality with a comprehensive solid waste management policy) may qualify to be an Environmental Management System if it provides multiple environmental services in addition to solid waste disposal and plans for the continuous improvement of solid waste management by appropriately and aggressively mitigating the environmental impacts of solid waste disposal, including greenhouse gas emissions reduction measures. Environmental Management

122

Issues related to EM management of DOE spent nuclear fuel  

SciTech Connect (OSTI)

This document is a summary of the important issues involved in managing spent nuclear fuel (SNF) owned by the Department of Energy (DOE). Issues related to civilian SNF activities are not discussed. DOE-owned SNF is stored primarily at the Hanford Site, Idaho National Engineering Laboratory (INEL), Savannah River Site (SRS), Oak Ridge National Laboratory (ORNL), and West Valley Demonstration Project. Smaller quantities of SNF are stored at Brookhaven National Laboratory, Sandia National Laboratories, and Los Alamos National Laboratory (LANL). There is a wide variety of fuel types, including both low and high enrichment fuels from weapons production, DOE reactors, research and development programs, naval programs, and universities. Most fuel is stored in pools associated with reactor or reprocessing facilities. Smaller quantities are in dry storage. Physical conditions of the fuel range from excellent to poor or severely damaged. An issue is defined as an important question that must be answered or decision that must be made on a topic or subject relevant to achieving the complimentary objectives of (a) storing SNF in compliance with applicable regulations and orders until it can be disposed, and (b) safely disposing of DOE`s SNF. The purpose of this document is to define the issues; no recommendations are made on resolutions. As DOE`s national SNF management program is implemented, a system of issues identification, documentation, tracking, and resolution will be implemented. This document is an initial effort at issues identification. The first section of this document is an overview of issues that are common to several or all DOE facilities that manage SNF. The common issues are organized according to specific aspects of spent fuel management. This is followed by discussions of management issues that apply specifically to individual DOE facilities. The last section provides literature references.

Abbott, D.G. [EG& G Idaho, Inc., Idaho Falls, ID (United States); Abashian, M.S.; Chakraborti, S.; Roberson, K.; Meloin, J.M. [IT Corp. (United States)

1993-07-01T23:59:59.000Z

123

MANAGEMENT INFORMATION SYSTEMS (MIS) CONCENTRATION FOR UNDERGRADUATES  

E-Print Network [OSTI]

MANAGEMENT INFORMATION SYSTEMS (MIS) CONCENTRATION FOR UNDERGRADUATES The management information systems concentration, like a major, focuses on the use of information technology for value creation creation. Link to Rensselaer 2012-2013 Catalog Required Courses MGMT 4240 Systems Analysis & Design MGMT

Salama, Khaled

124

Computer aided home energy management system.  

E-Print Network [OSTI]

??As the electricity demand approaches generation capacity, the operating reserve capacity of the power system shrinks, causing an increased risk of outages. Demand Side Management… (more)

Moholkar, Asawari A.

2005-01-01T23:59:59.000Z

125

UNCLASSIFIED Nuclear Materials Management & Safeguards System  

National Nuclear Security Administration (NNSA)

Nuclear Materials Management & Safeguards System CHANGE OF PROJECT NUMBER UPDATE PROJECT Project Number: Title: Date Valid: Date Deactivated: Classification Codes: Project Number:...

126

ORISE: Asset Readiness Management System (ARMS)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Asset Readiness Management System (ARMS) Database tracks emergency response exercises and equipment to help DOE asses emergency preparedness Developed by the Oak Ridge Institute...

127

Energy Management System Implementation ? First Webinar- Overview  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

W1-1 | Advanced Manufacturing Office eere.energy.gov ADVANCED MANUFACTURING OFFICE Energy Management System Implementation - First Webinar- Overview Deann Desai and Ed Hardison 4...

128

Environmental Management Systems | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Systems The U.S. Department of Energy (DOE) is committed to implement sustainability into all aspects of operations. Executive Order (EO) 13423, Strengthening Federal...

129

Environmental Management Systems | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Systems The Department of Energy (DOE) is committed to implement sustainability into all aspects of operations. Executive Order (EO) 13423, Strengthening Federal...

130

Waste Management Information System (WMIS) User Guide  

SciTech Connect (OSTI)

This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data throuh the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal.

R. E. Broz

2008-12-22T23:59:59.000Z

131

EM Employee Serves Military in Afghanistan, Manages $5.8 Billion Army Task  

Broader source: Energy.gov (indexed) [DOE]

Employee Serves Military in Afghanistan, Manages $5.8 Billion Employee Serves Military in Afghanistan, Manages $5.8 Billion Army Task Order EM Employee Serves Military in Afghanistan, Manages $5.8 Billion Army Task Order February 27, 2013 - 12:00pm Addthis James Hawkins James Hawkins BAGRAM AIRFIELD, Afghanistan - EM employee James Hawkins is currently serving the U.S. military in Afghanistan, where he is administering a $5.8 billion task order for the Army. A major in the U.S. Air Force Reserves, Hawkins is an administrative contracting officer for the Defense Contract Management Agency, a component of the Defense Department that directly contributes to the military readiness of the U.S. and its allies. Hawkins is an acquisition planning manager and procurement analyst in the Office of Procurement Planning in EM's Office of Acquisition and Project

132

Implementation Guide for Integrating Environmental Management Systems into Integrated Safety Management Systems  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides guidance to assist DOE sites in identifying those missing environmental management systems elements and integrating them into the site's integrated safety management system. Canceled by DOE N 251.96.

2004-08-20T23:59:59.000Z

133

Privacy Impact Assessment OFEO Facilities Management System Facilities Center  

E-Print Network [OSTI]

Privacy Impact Assessment OFEO Facilities Management System ­ Facilities Center I. System Identification 1. IT System Name: Facilities Management System - FacilityCenter 2. IT System Sponsor: Office. IT System Manager: Michelle T. Gooch, Facilities Management Systems Manager 5. PIA Author: Michelle T. Gooch

Mathis, Wayne N.

134

2011 Annual Planning Summary for Environmental Management (EM...  

Energy Savers [EERE]

(EM) More Documents & Publications 2012 Annual Planning Summary for Bonneville Power Administration 2014 Annual Planning Summary for the West Valley Demonstration Project...

135

Program Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Management Program Management Safety The Office of Environmental Management's (EM) top priority is to ensure proper implementation and continuous improvement of Integrated Safety Management Systems (ISMS) in the EM complex and to serve as a focal point for EM safety standards and policy development and interpretation and interfaces with internal/external oversight organizations Read more Acquisition The Office of Environmental Management strives to assure effective project, acquisition, and contract management, by working closely with senior level officials in Headquarters and Field Managers; external stakeholders; and major contractors for the purpose of achieving acquisition and project management objectives of the Office of Environmental Management (EM)

136

IWater Processing and Waste Management SystemsIntegrated System Health Management 2007 Phase II  

E-Print Network [OSTI]

SBIR SBIR 44 45 IWater Processing and Waste Management SystemsIntegrated System Health Management valuable and, in some cases, critical features for Integrated System Health Management (ISHM) developersDE DP) to TRL 6 or higher. To facilitate Phase III NASA transition, the second program goal is deploying

137

Power management in the EPOS system  

Science Journals Connector (OSTI)

Power management strategies for embedded systems typically rely on static, application driven deactivation of components (e.g. sleep, suspend), or on dynamic voltage and frequency scaling. However, the design and implementation of these strategies in ... Keywords: embedded systems, imprecise computation, power management

Geovani Ricardo Wiedenhoft; Lucas Francisco Wanner; Giovani Gracioli; Antônio Augusto Fröhlich

2008-10-01T23:59:59.000Z

138

MANAGED OBJECT PATTERN Class Behavioral Provide direct control of individual resources in a managed system. The Managed Object  

E-Print Network [OSTI]

in a managed system. The Managed Object provides a one-to-one mapping to the manageable entities, as well system, in which case the Manager-Agent pattern might be more appropriate). #12;2 / 4 Structure management systems to learn about the contents of the MIB. · Managed Object - Represents a single resource

Keller, Rudolf K.

139

PIA - Foreign Travel Management System (FTMS) | Department of...  

Office of Environmental Management (EM)

(FTMS) PIA - Foreign Travel Management System (FTMS) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM...

140

U-040: HP-UX System Administration Manager Lets Local Users Gain Elevated  

Broader source: Energy.gov (indexed) [DOE]

0: HP-UX System Administration Manager Lets Local Users Gain 0: HP-UX System Administration Manager Lets Local Users Gain Elevated Privileges U-040: HP-UX System Administration Manager Lets Local Users Gain Elevated Privileges November 17, 2011 - 8:00am Addthis PROBLEM: HP-UX System Administration Manager Lets Local Users Gain Elevated Privileges. PLATFORM: HP-UX B.11.11, B.11.23, B.11.31; running Enterprise Mobility Suite (EMS) prior to A.04.20.11.04_01 ABSTRACT: A local user can obtain elevated privileges on the target system. reference LINKS: HP Support Center Document ID: c03089106 CVE-2011-4159 SecurityTracker Alert ID: 1026331 IMPACT ASSESSMENT: Medium Discussion: A vulnerability was reported in HP-UX System Administration Manager. A local user can obtain elevated privileges on the target system. A local user can gain full control of the target system.

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

U-040: HP-UX System Administration Manager Lets Local Users Gain Elevated  

Broader source: Energy.gov (indexed) [DOE]

40: HP-UX System Administration Manager Lets Local Users Gain 40: HP-UX System Administration Manager Lets Local Users Gain Elevated Privileges U-040: HP-UX System Administration Manager Lets Local Users Gain Elevated Privileges November 17, 2011 - 8:00am Addthis PROBLEM: HP-UX System Administration Manager Lets Local Users Gain Elevated Privileges. PLATFORM: HP-UX B.11.11, B.11.23, B.11.31; running Enterprise Mobility Suite (EMS) prior to A.04.20.11.04_01 ABSTRACT: A local user can obtain elevated privileges on the target system. reference LINKS: HP Support Center Document ID: c03089106 CVE-2011-4159 SecurityTracker Alert ID: 1026331 IMPACT ASSESSMENT: Medium Discussion: A vulnerability was reported in HP-UX System Administration Manager. A local user can obtain elevated privileges on the target system. A local user can gain full control of the target system.

142

Integrated safety management system verification: Volume 2  

SciTech Connect (OSTI)

Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalization of an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR, 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System (ISMS). Guidance and expectations have been provided to PNNL by incorporation into the operating contract (Contract DE-ACM-76FL0 1830) and by letter. The contract requires that the contractor submit a description of their ISMS for approval by DOE. PNNL submitted their proposed Safety Management System Description for approval on November 25,1997. RL tentatively approved acceptance of the description pursuant to a favorable recommendation from this review. The Integrated Safety Management System Verification is a review of the adequacy of the ISMS description in fulfilling the requirements of the DEAR and the DOE Policy. The purpose of this review is to provide the Richland Operations Office Manager with a recommendation for approval of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and to verify the extent and maturity of ISMS implementation within the Laboratory. Further the review will provide a model for other DOE laboratories managed by the Office of Assistant Secretary for Energy Research.

Christensen, R.F.

1998-08-10T23:59:59.000Z

143

System Engineering Design [Nuclear Waste Management using  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

System Engineering System Engineering Design Nuclear Fuel Cycle and Waste Management Technologies Overview Modeling and analysis Unit Process Modeling Mass Tracking System Software Waste Form Performance Modeling Safety Analysis, Hazard and Risk Evaluations Development, Design, Operation Overview Systems and Components Development Expertise System Engineering Design Other Major Programs Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE Division on Flickr Nuclear Waste Management using Electrometallurgical Technology System Engineering Design Bookmark and Share Two major pieces of electrometallurgical process equipment are the Electrorefiner and the Cathode Processor. NE personnel have been involved in the conceptual design, final design, procurement, manufacture,

144

EM's Development Program for New Managers/Supervisors | Department...  

Broader source: Energy.gov (indexed) [DOE]

Series (Leadership Seminars) Leading EDGE- Executives Driving Government Excellence Fundamentals of Program Management Changing Dimension in DOE Communication Matters Five...

145

Report: Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management  

Broader source: Energy.gov (indexed) [DOE]

REPORT TO THE REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management Submitted by the EMAB Acquisition and Project Management Subcommittee December 5, 2011 Introduction: This report provides a comprehensive summary of the work performed by the Acquisition and Project Management Subcommittee (APMS) of the Environmental Management Advisory Board, since tasking in March 2010. In particular, this report includes the summary observations developed and recommendations previously approved by the EMAB on the Subcommittee's work and presented to the then Assistant Secretary of Environmental Management (EM). As the

146

Definition: Outage Management System | Open Energy Information  

Open Energy Info (EERE)

Outage Management System Outage Management System A software application that can process outage reports from a variety of utility operational systems including SCADA, AMI, and customer phone calls, and display outage information to utility operators. The OMS can help a utility interpret outage information and determine where the likely cause of an outage may be. It can also help the utility optimize its service restoration resources.[1] Related Terms advanced metering infrastructure References ↑ https://www.smartgrid.gov/category/technology/outage_management_system [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Outage_Management_System&oldid=502507

147

A Systems Approach to Managing Oil  

E-Print Network [OSTI]

A Systems Approach to Managing Oil Transportation Risk in Prince William Sound Jason R. W. Merrick Received April 21, 2000; revised June 12, 2000; accepted June 26, 2000MANAGING OIL TRANSPORTATION RISK about the safety of oil transportation in the Prince William Sound, Alaska. As a result, a large number

van Dorp, Johan René

148

EM Officials Join Environmental Management Advisory Board to Celebrate 20th  

Broader source: Energy.gov (indexed) [DOE]

Officials Join Environmental Management Advisory Board to Officials Join Environmental Management Advisory Board to Celebrate 20th Anniversary EM Officials Join Environmental Management Advisory Board to Celebrate 20th Anniversary June 5, 2012 - 12:00pm Addthis IDAHO FALLS, Idaho - EM Principal Deputy Assistant Secretary Tracy Mustin joined other officials last week to mark the 20th year of the independent, volunteer advisory board that offers the Assistant Secretary for the Office of Environmental Management guidance on critical issues involved in the world's largest nuclear cleanup. Mustin thanked the 14 current members of the Environmental Management Advisory Board (EMAB) and emphasized the value of their contributions and input from their independent, external perspectives. She called the board's two decades of service an impressive milestone.

149

EM Quality Assurance Program (EM-QA-001 Revision 0) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Program Management » Quality Assurance » EM Quality Services » Program Management » Quality Assurance » EM Quality Assurance Program (EM-QA-001 Revision 0) EM Quality Assurance Program (EM-QA-001 Revision 0) Previous revision of the Environmental Management Quality Assurance Program. The program is the EM management system to ensure we"do work correctly." This document has been superseded by Revision 1 of the program, but is still in use at some EM sites. EM Quality Assurance Program (EM-QA-001 Revision 0) More Documents & Publications Quality Assurance Program EM Quality Assurance Program (EM-QA-001 Revision 1) SOPP-43, EM-23 Quality Assurance Oversight Waste Management Nuclear Materials & Waste Tank Waste and Waste Processing Waste Disposition Packaging and Transportation Site & Facility Restoration

150

Integrated Safety Management System Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide provide DOE line management information useful for implementing the provisions of DOE P 450.4A and the requirements and responsibilities of DOE O 450.2. Cancels and supersedes DOE G 450.4-1B and DOE G 450.3-3.

2011-09-29T23:59:59.000Z

151

Computerized Maintenance Management Systems | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Areas » Operations & Maintenance » Computerized Program Areas » Operations & Maintenance » Computerized Maintenance Management Systems Computerized Maintenance Management Systems October 7, 2013 - 9:35am Addthis Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff. Capabilities Typical CMMS functions depend on the complexity of the system chosen. Examples include: Work order generation, prioritization, and tracking by equipment and/or component. Work orders often can be sorted by equipment, date, person responding, etc. Tracking scheduled and unscheduled maintenance activities Storing technical documentation and maintenance procedures by

152

Regulatory software configuration management system design  

Science Journals Connector (OSTI)

The gap between nuclear safety-related regulations and the commercial software configuration management causes software quality concerns for Digital Control and Information System (DCIS) of a nuclear power plant. The main reason is that the DCIS of a ...

I-Hsin Chou; Chin-Feng Fan

2006-09-01T23:59:59.000Z

153

Materials System Inventory Management Practices at Washington...  

Office of Environmental Management (EM)

Materials System Inventory Management Practices at Washington River Protection Solutions OAS-M-15-01 January 2015 U.S. Department of Energy Office of Inspector General Office of...

154

Planning for an Energy Management System  

Broader source: Energy.gov [DOE]

This presentation discusses the Planning step as part of an Energy Management System. Planning involves establishing your energy picture, defining the scope and boundary, setting an energy baseline, and developing action plans.

155

SLAC Management Systems Larry Dardzinski/Ops/x4794  

E-Print Network [OSTI]

SLAC Management Systems PPA Update 24 May 12 Larry Dardzinski/Ops/x4794 #12;Outline · Management · Discussion Page 2 #12;A simple definition of a Management System A management system is the means by which of Management Systems? · Allow your customers and users to efficiently and effectively access your services

Wechsler, Risa H.

156

UNCLASSIFIED Nuclear Materials Management & Safeguards System  

National Nuclear Security Administration (NNSA)

Nuclear Materials Management & Safeguards System Nuclear Materials Management & Safeguards System CHANGE OF PROJECT NUMBER UPDATE PROJECT Project Number: Title: Date Valid: Date Deactivated: Classification Codes: Project Number: Project Title: Associated Materials: Programmatic RIS Previous Project Number(s) Status Code Allotment Code (S=Supplier, U=User) I authorize that the information listed above is for the NMMSS Program to use as part of the project number conversion process for this facility.

157

EM Supports Department's Small Business Commitment at Waste Management...  

Broader source: Energy.gov (indexed) [DOE]

Bahan from the Environmental Management Consolidated Business Center in Cincinnati and Kelly Brazil from the Office of River Protection at the Hanford site in Washington state....

158

EM's Development Program for New Managers/Supervisors Presentation  

Broader source: Energy.gov [DOE]

This development program provides new managers and supervisors with 80 hours of developmental activities during the first two years they are in a leadership position.

159

The design and implementation of the buffer manager for an experimental relational database management system  

E-Print Network [OSTI]

Buffer management is an essential component of database management. This thesis presents a design and implementation of the buffer manager for an experimental relational database management system. The relationship and difference between database...

Li, Zaichun

2012-06-07T23:59:59.000Z

160

PIA - HSS Electronic Visitor Management System (HSEVMS) | Department...  

Office of Environmental Management (EM)

- HSS Electronic Visitor Management System (HSEVMS) More Documents & Publications PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL PeopleSoft - Human...

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Earned Value Management System (EVMS) and Project Analysis Standard...  

Broader source: Energy.gov (indexed) [DOE]

Management System (EVMS) and Project Analysis Standard Operating Procedure (EPASOP)- March 2014 Earned Value Management System (EVMS) and Project Analysis Standard Operating...

162

Quality Management Systems for Zero Energy Ready Home Webinar...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Below is the text version...

163

Office of Personnel Management (OPM) Billing System PIA, Office...  

Office of Environmental Management (EM)

Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and...

164

V-132: IBM Tivoli System Automation Application Manager Multiple...  

Energy Savers [EERE]

32: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 -...

165

Concept for Management of the Future Electricity System (Smart...  

Open Energy Info (EERE)

Management of the Future Electricity System (Smart Grid Project) Jump to: navigation, search Project Name Concept for Management of the Future Electricity System Country Denmark...

166

Security Analysis and Project Management Systems | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Security Analysis and Project Management Systems SHARE Security Analysis and Project Management Systems ORNL brings together the subject matter experts with programmers to design,...

167

Introduction to an Energy Management System | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

& Publications The Do and Check Processes of an Energy Management System Planning for an Energy Management System Becoming a Certified Practitioner or a Certified Energy Engineer...

168

Building Energy Monitoring System: Making Energy Manageable  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building Energy Monitoring System: Making Energy Manageable Building Energy Monitoring System: Making Energy Manageable Speaker(s): Bob Hunter Date: July 21, 2006 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Peng Xu For any line-item expense to be managed, it must first be manageable. In most organizations, this means bringing that expense into the budget/forecast/variance cycle at the department and individual level. While energy costs are the second fastest growing for most organizations, they have simply received a pass on individual accountability. TrendPoint provides a patented system for monitoring energy at the department and user-level. By monitoring each circuit, we assign a circuit to a user, each user to a group and each group to a site. Energy budgets can then be created and assigned to departments, allowing energy costs become a part of

169

An Evolutive and Multilingual CIM Ontology Management System  

Science Journals Connector (OSTI)

CIM(Common Information Model) descrybed by IEC 61970/61968 standards is recognized as the Smart Grid ontology, while Chinese localized standards of the IEC 61970 series are published as DL/T 890 series and are widely applied to power management systems throughout China. The CIM series standards define an application program interface (API) for energy management system (EMS). One core part of the standards is IEC 61970-301, which defines the CIM base set of packages which provide a logical view of the functional aspects of an EMS. Also, there are other parts of the standards which define logical views of the parts related to EMS, such as IEC 61970-302 and IEC 61968-11. Although each part of the standards is defined as a standalone UML (Unified Modeling Language) model, a unified UML model in one UML file is maintained by IEC TC57. However, as each part of the standards and its partitive ontology model are developed by different working groups of the committee and are at different standard statuses, it is necessary to provide a continuous maintenance for the CIM ontology publicly and worldwide. Difficulties to realize the continuous CIM ontology management are caused by the present CIM model. Some typical insufficiencies of the existing CIM model are described in [1]. E.g., CIM model has a lack of version information and no version control mechanism for each entity is provided in the CIM standards so that the data integrity between ontologies of new version and old version is not guaranteed. In this paper, to achieve a continuous CIM ontology management, at first, a CIM model is transformed to the IEC 62656 model which provides a methodology to overcome the current CIM weakness. This paper will focus on the principle of transformation of CIM UML model to the IEC 62656 model. In addition the prime advantages brought about by the CIM on the IEC 62656 model such as CIM localization, customization and validation are explained. Furthermore, an evolution- mechanism integrated CIM ontology database manage- ment system via the IEC 62656 model is introduced.

Lan Wang; Akira Hosokawa; Hiroshi Murayama

2011-01-01T23:59:59.000Z

170

Application of Management Frameworks: A Case Study on Managing Workflow related Systems  

E-Print Network [OSTI]

Application of Management Frameworks: A Case Study on Managing Workflow related Systems Srinath management of a system involves much more complexities than just closing the control loop by implementing management usecase for managing workflow related systems using Hasthi, a ro- bust, scalable, and distributed

Plale, Beth

171

System Management Software for Virtual Environments  

SciTech Connect (OSTI)

Recently there has been an increased interest in the use of system-level virtualization using mature solutions such as Xen, QEMU, or VMWare. These virtualization platforms are being used in distributed and parallel environments including high performance computing. The use of virtual machines within such environments introduces new challenges to system management. These include tedious tasks such as deploying para-virtualized host operating systems to support virtual machine execution or virtual overlay networks to connect these virtual machines. Additionally, there is the problem of machine definition and deployment, which is complicated by differentiation in the underlying virtualization technology. This paper discusses tools for the deployment and management of both host operating systems and virtual machines in clusters. We begin with an overview of system-level virtualization and move on to a description of tools that we have developed to aid with these environments. These tools extend prior work in the area of cluster installation, configuration and management.

Vallee, Geoffroy R [ORNL; Naughton, III, Thomas J [ORNL; Scott, Stephen L [ORNL

2007-01-01T23:59:59.000Z

172

Seamless Energy Management Systems Part I: Assessment of Energy  

E-Print Network [OSTI]

Seamless Energy Management Systems Part I: Assessment of Energy Management Systems and Key to Engineer the Future Electric Energy System #12;#12;Seamless Energy Management Systems Part I: Assessment of Energy Management Systems and Key Technological Requirements Final Project Report Project Faculty Team

173

BATTLEFIELD NETWORK APPLICATIONS OF THE SHAMAN MANAGEMENT SYSTEM  

E-Print Network [OSTI]

BATTLEFIELD NETWORK APPLICATIONS OF THE SHAMAN MANAGEMENT SYSTEM Adarshpal S. Sethi Dong Zhu Vasil Architecture for MANagement). This management system developed at the Network Management Laboratory framework to facili- tate the management of distributed systems [1], [2], [3], [4]. This architecture allows

Sethi, Adarshpal

174

Development of an Integrated Distribution Management System  

SciTech Connect (OSTI)

This final report details the components, functionality, costs, schedule and benefits of developing an Integrated Distribution Management System (IDMS) for power distribution system operation. The Distribution Automation (DA) and Supervisory Control and Data Acquisition (SCADA) systems used by electric power companies to manage the distribution of electric power to retail energy consumers are vital components of the Nation’s critical infrastructure. Providing electricity is an essential public service and a disruption in that service, if not quickly restored, could threaten the public safety and the Nation’s economic security. Our Nation’s economic prosperity and quality of life have long depended on the essential services that utilities provide; therefore, it is necessary to ensure that electric utilities are able to conduct their operations safely and efficiently. A fully integrated technology of applications is needed to link various remote sensing, communications and control devices with other information tools that help guide Power Distribution Operations personnel. A fully implemented IDMS will provide this, a seamlessly integrated set of applications to raise electric system operating intelligence. IDMS will enhance DA and SCADA through integration of applications such as Geographic Information Systems, Outage Management Systems, Switching Management and Analysis, Operator Training Simulator, and other Advanced Applications, including unbalanced load flow and fault isolation/service restoration. These apps are capable of utilizing and obtaining information from appropriately installed DER, and by integrating disparate systems, the Distribution Operators will benefit from advanced capabilities when analyzing, controlling and operating the electric system.

Schatz, Joe E.

2010-10-20T23:59:59.000Z

175

Dynamic thermal management in chip multiprocessor systems  

E-Print Network [OSTI]

- mal Management (PDTM) based on Application-based Thermal Model (ABTM) and Core-based Thermal Model (CBTM) in the multicore systems. Based on predicted temperature from ABTM and CBTM, the proposed PDTM can maintain the system temperature below a desired...

Liu, Chih-Chun

2009-05-15T23:59:59.000Z

176

Strategic Planning System for Exotic Game Management  

E-Print Network [OSTI]

. Jerry Stuth The paradigm of indiscriminate introduction of exotic ungulates has escalated the need for ecological and biological understanding of nonindigenous species. Management of any species or animal enterprise is a dynamic process..., and requires ecological considerations as well as economic constraints. The initial framework of Strategic Planning System for Exotic Game (SPSEG) may allow proactive management of animal enterprises and help mediate the often conflicting short term needs...

Lubbering, Jeanne Marie Petrofes

2012-06-07T23:59:59.000Z

177

Vol 2, Integrated Safety Management System Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is approved for use by the Office of Environment, Safety and Health (EH) and is available for use by all DOE components and their contractors. This Guide is a consensus document coordinated by EH and prepared under the direction of the DOE Safety Management Implementation Team (SMIT). Canceled by DOE G 450.4-1B.

1999-05-27T23:59:59.000Z

178

Tank waste remediation system systems engineering management plan  

SciTech Connect (OSTI)

This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation Systems (TWRS) implementation of U.S. Department of Energy (DOE) Systems Engineering (SE) policy provided in Tank Waste Remediation System Systems Engineering Management Policy, DOE/RL letter, 95-RTI-107, Oct. 31, 1995. This SEMP defines the products, process, organization, and procedures used by the TWRS Program to accomplish SE objectives. This TWRS SEMP is applicable to all aspects of the TWRS Program and will be used as the basis for tailoring SE to apply necessary concepts and principles to develop and mature the processes and physical systems necessary to achieve the desired end states of the program.

Peck, L.G.

1996-02-06T23:59:59.000Z

179

Cloud-Based Transportation Management System Delivers Savings  

Broader source: Energy.gov [DOE]

DOE’s cloud based transportation management system (ATLAS) offers dramatically enhanced capabilities and modernization.

180

Tank waste remediation system systems engineering management plan  

SciTech Connect (OSTI)

This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.

Peck, L.G.

1998-01-08T23:59:59.000Z

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Input Management of Production Systems  

Science Journals Connector (OSTI)

...laboratory study. The open systems of real-world environments cannot be enclosed...out of New York City. Long-term sustainable solutions are to be found in waste...maintain drinking water quality, real estate and other development on the watershed...

EUGENE P. ODUM

1989-01-13T23:59:59.000Z

182

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

February 20, 2003 February 20, 2003 EIS-0285-SA-123: Supplement Analysis Transmission System Vegetation Management Program February 19, 2003 EIS-0285-SA-126: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-125: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-124: Supplement Analysis Transmission System Vegetation Management Program February 12, 2003 EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program February 10, 2003 EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington January 16, 2003 EIS-0285-SA-117: Supplement Analysis Transmission System Vegetation Management Program December 24, 2002

183

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

July 19, 2002 July 19, 2002 EIS-0285-SA-96: Supplement Analysis Transmission System Vegetation Management Program, Snohomish District Substations July 19, 2002 EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program July 9, 2002 EIS-0285-SA-81: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-84: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-80: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-78: Supplement Analysis Transmission System Vegetation Management Program June 21, 2002 EIS-0285-SA-75: Supplement Analysis Transmission System Vegetation Management Program May 31, 2002 EIS-0285-SA-58: Supplement Analysis

184

Project Management and Systems Support | National Nuclear Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Management and Systems Support | National Nuclear Security Project Management and Systems Support | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Project Management and Systems Support Home > About Us > Our Operations > Acquisition and Project Management > Project Management and Systems Support Project Management and Systems Support Goal

185

Project Management and Systems Support | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Project Management and Systems Support | National Nuclear Security Project Management and Systems Support | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Project Management and Systems Support Home > About Us > Our Operations > Acquisition and Project Management > Project Management and Systems Support Project Management and Systems Support Goal

186

1993 baseline solid waste management system description  

SciTech Connect (OSTI)

Pacific Northwest Laboratory has prepared this report under the direction of Westinghouse Hanford Company. The report provides an integrated description of the system planned for managing Hanford`s solid low-level waste, low-level mixed waste, transuranic waste, and transuranic mixed waste. The primary purpose of this document is to illustrate a collective view of the key functions planned at the Hanford Site to handle existing waste inventories, as well as solid wastes that will be generated in the future. By viewing this system as a whole rather than as individual projects, key facility interactions and requirements are identified and a better understanding of the overall system may be gained. The system is described so as to form a basis for modeling the system at various levels of detail. Model results provide insight into issues such as facility capacity requirements, alternative system operating strategies, and impacts of system changes (ie., startup dates). This description of the planned Hanford solid waste processing system: defines a baseline system configuration; identifies the entering waste streams to be managed within the system; identifies basic system functions and waste flows; and highlights system constraints. This system description will evolve and be revised as issues are resolved, planning decisions are made, additional data are collected, and assumptions are tested and changed. Out of necessity, this document will also be revised and updated so that a documented system description, which reflects current system planning, is always available for use by engineers and managers. It does not provide any results generated from the many alternatives that will be modeled in the course of analyzing solid waste disposal options; such results will be provided in separate documents.

Armacost, L.L.; Fowler, R.A.; Konynenbelt, H.S.

1994-02-01T23:59:59.000Z

187

The Information System The ideal system manager has the curiosity of a cat,  

E-Print Network [OSTI]

Chapter 2 The Information System Manager #12;The ideal system manager has the curiosity of a cat manage? As a property level information system manager, you may manage the following 3 types of computer #12;Who should manage the information system? O Patience and good communication skills O Hands

188

Earned Value Management System (EVMS) Certifications | U.S. DOE...  

Office of Science (SC) Website

Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS)...

189

Implementation Guide for Integrating Pollution Prevention into Environmental Management Systems  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide suggests approaches to integrating pollution prevention into Integrated Safety Management/Environmental Management Systems. Canceled by DOE N 251.82.

2005-05-27T23:59:59.000Z

190

UNIVERSITY OF PITTSBURGH AT GREENSBURG Management -Information Systems  

E-Print Network [OSTI]

UNIVERSITY OF PITTSBURGH AT GREENSBURG Management - Information Systems u n d e r g r a d u a t e p r o g r a m Management - Information Systems 48 credits Bachelor of Science Management - Information Accounting MGMT 1818 Management Science INFSCI 0010 Introduction to Information Systems and Society Area

Sibille, Etienne

191

Management and Safety of Transportation Systems  

E-Print Network [OSTI]

Management and Safety of Transportation Systems University Transportation Center for Alabama A N N@eng.ua.edu www.eng.ua.edu Editors: James Cruise, Ph.D. Barbara Moore University Transportation Center for Alabama Transportation Center for Alabama (UTCA). The contents of this Annual Report reflect the views of the editors

Carver, Jeffrey C.

192

Policy Management for Networked Systems and Applications  

E-Print Network [OSTI]

Policy Management for Networked Systems and Applications Dakshi Agrawal, Seraphin Calo, James Giles {agrawal,scalo,gilesjam,kangwon,dverma}@us.ibm.com Abstract In this paper, we present a novel policy and administrative domains. The proposed policy middleware provides a standard infrastructure for the creation

Lee, Kang-Won

193

WORKLOAD ADAPTATION IN AUTONOMIC DATABASE MANAGEMENT SYSTEMS  

E-Print Network [OSTI]

in Autonomic DBMSs", Proceedings of the 2nd International Workshop on Self-Managing Database Systems (SMDB 2007 to meet its Service Level Objectives (SLOs). It is a challenge to adapt multiple workloads with complex scheduler that performs workload adaptation in a DBMS, as the test bed to prove the effectiveness

194

Integrated Safety, Environmental, & Emergency Management Systems (ISEEMS)  

SciTech Connect (OSTI)

Sandia`s Risk Management and NEPA Department recognized the need for hazard and environmental data analysis and management to support the line managers` need to know, understand, manage and document the hazards inherent in their facilities and activities. ISEEMS (Integrated Safety, Environmental, & Emergency Management System) was developed in response to this need. ISEEMS takes advantage of the fact that there is some information needed for the NEPA process that is also needed for the safety documentation process. The ISEEMS process enables Sandia to identify and manage hazards and environmental concerns at a level of effort commensurate with the hazards themselves by adopting a necessary and sufficient (graded) approach to compliance. The Preliminary Hazard Screening module of ISEEMS determines the facility or project activity hazard classification and facility designation. ISEEMS` geo-referenced icon allows immediate, visual integration of hazard information across geographic boundaries resulting in significant information compression. At Sandia, ISEEMS runs on the Sandia Internal Restricted Network, in an MS-Windows environment on standard PC hardware. The possibility of transporting ISEEMS to a ``WEB-like`` environment is being explored.

Silver, R.; Langwell, G.; Thomas, C.; Coffing, S.

1996-05-01T23:59:59.000Z

195

Survey and Taxonomy of Grid Resource Management Systems Chaitanya Kandagatla  

E-Print Network [OSTI]

Survey and Taxonomy of Grid Resource Management Systems Chaitanya Kandagatla University of Texas, Austin Abstract The resource management system is the central component of a grid system. This paper management architectures of popular contemporary grid systems. 1. Introduction Grid systems are inter

Browne, James C.

196

HAMMER COURSEWARE MANAGEMENT SYSTEM (CMS) SYSTEM DEVELOPMENT & IMPLEMENTATION  

SciTech Connect (OSTI)

HAMMER Courseware Management System (HAMMERCMS) is the official name of the system Fluor Hanford, Inc., uses to facilitate development of, deliver, and track training presented in some electronic form (mainly, web-based training) to Hanford Site employees, subcontractors, and vendors.

GARDNER, P.R.

2006-04-28T23:59:59.000Z

197

SOPP-43, EM-23 Quality Assurance Oversight  

Broader source: Energy.gov (indexed) [DOE]

. POLICY: The Office of Environmental Management (EM) Quality Assurance program . POLICY: The Office of Environmental Management (EM) Quality Assurance program requirements and expectations are documented in the EM Quality Assurance Program (QAP), EM-QA-001, dated October 2008. The QAP is the EM management system to ensure that all EM organizations "do work correctly." The QAP meets the requirements of DOE O 414.1C, Quality Assurance, and 10 CFR 830 Subpart A "Quality Assurance Requirements." The QAP demonstrates how QA and the Integrated Safety Management System (ISMS) are fully integrated in EM. The QAP also provides consistent QA implementation across EM while allowing both for grading based on importance to the EM mission and safety, and for site-specific requirements to be addressed (e.g., DOE/RW-0333P, Quality Assurance

198

PIA - Human Resources Management System | Department of Energy  

Office of Environmental Management (EM)

System PIA - Human Resources Management System More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change...

199

u.s. DEPARTIIIENT OF ENERGY EERE PROJECT MANAG EM EN T CENTER  

Broader source: Energy.gov (indexed) [DOE]

MANAG MANAG EM EN T CENTER NEPA DETERlIIINATION RECIPI(£NT:MicroLink Devices, Inc. PROJECT TITLE: MicroUnk Devices Solar Cell Fabrication Facility Page 1 of2 STATE: IL Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-OOOOOS2 EE0000119 GFO-10-326 0 Based on my review orlhe infonnation concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.1A), I have made thl' following detennination: ex, EA, EIS APPENDIX AND NUMBER: Description: B1.31 Relocation of machinery and equipment, such as analytical laboratory appara tus, electronic hardware, maintenance equipment. and health and safety equipment, inCluding minor construction necessary for removal and installation,

200

Used Fuel Management System Interface Analyses - 13578  

SciTech Connect (OSTI)

Preliminary system-level analyses of the interfaces between at-reactor used fuel management, consolidated storage facilities, and disposal facilities, along with the development of supporting logistics simulation tools, have been initiated to provide the U.S. Department of Energy (DOE) and other stakeholders with information regarding the various alternatives for managing used nuclear fuel (UNF) generated by the current fleet of light water reactors operating in the United States. An important UNF management system interface consideration is the need for ultimate disposal of UNF assemblies contained in waste packages that are sized to be compatible with different geologic media. Thermal analyses indicate that waste package sizes for the geologic media under consideration by the Used Fuel Disposition Campaign may be significantly smaller than the canisters being used for on-site dry storage by the nuclear utilities. Therefore, at some point along the UNF disposition pathway, there could be a need to repackage fuel assemblies already loaded and being loaded into the dry storage canisters currently in use. The implications of where and when the packaging or repackaging of commercial UNF will occur are key questions being addressed in this evaluation. The analysis demonstrated that thermal considerations will have a major impact on the operation of the system and that acceptance priority, rates, and facility start dates have significant system implications. (authors)

Howard, Robert; Busch, Ingrid [Oak Ridge National Laboratory, P.O. Box 2008, Bldg. 5700, MS-6170, Oak Ridge, TN 37831 (United States)] [Oak Ridge National Laboratory, P.O. Box 2008, Bldg. 5700, MS-6170, Oak Ridge, TN 37831 (United States); Nutt, Mark; Morris, Edgar; Puig, Francesc [Argonne National Laboratory (United States)] [Argonne National Laboratory (United States); Carter, Joe; Delley, Alexcia; Rodwell, Phillip [Savannah River National Laboratory (United States)] [Savannah River National Laboratory (United States); Hardin, Ernest; Kalinina, Elena [Sandia National Laboratories (United States)] [Sandia National Laboratories (United States); Clark, Robert [U.S. Department of Energy (United States)] [U.S. Department of Energy (United States); Cotton, Thomas [Complex Systems Group (United States)] [Complex Systems Group (United States)

2013-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Studies on Integrated Management and Technology System of Cycling Logistics  

Science Journals Connector (OSTI)

The frame on integrated management system of cycling logistics is constructed. The content, function, structure, realization process, operation model of the business and technical systems that consist of cycling logistics integrated management are preliminarily ... Keywords: Cycling Logistics, integrated management, technology System, Service System

Huan Zhang; Zhong Cheng; Yi Lu

2008-10-01T23:59:59.000Z

202

Management summary report. Auditing and financial system  

SciTech Connect (OSTI)

Increased leasing of Federal lands for energy exploration will add to the regulatory and administrative responsibilities of the USGS's Conservation Division. Similar responsibilities for Indian lands will arise. The objectives of the Conservation Division is to reduce the regulatory burden on industry while effectively and efficiently discharging its responsibility. This Management Summary Report represents the completion of the Preliminary Systems Design of the Auditing and Financial System, and is the first phase of the Improved Royalty Management Program (IRMP). Work reported includes: a Functional Specifications Report; Technical Specifications Report; Installation Plan; and a cost/benefit analysis. The potential benefits to be realized from the IRMP are significant and include: increased royalty receipts; more timely availability of funds; increased productivity of personnel; reduced regulatory burden on private industry; tighter security over information collected; reduced exposure to fraud and abuse; and better control over activities and funds.

Feldmiller, W.H.

1980-01-01T23:59:59.000Z

203

Electricity Demand and Energy Consumption Management System  

E-Print Network [OSTI]

This project describes the electricity demand and energy consumption management system and its application to the Smelter Plant of Southern Peru. It is composted of an hourly demand-forecasting module and of a simulation component for a plant electrical system. The first module was done using dynamic neural networks, with backpropagation training algorithm; it is used to predict the electric power demanded every hour, with an error percentage below of 1%. This information allows management the peak demand before this happen, distributing the raise of electric load to other hours or improving those equipments that increase the demand. The simulation module is based in advanced estimation techniques, such as: parametric estimation, neural network modeling, statistic regression and previously developed models, which simulates the electric behavior of the smelter plant. These modules allow the proper planning because it allows knowing the behavior of the hourly demand and the consumption patterns of the plant, in...

Sarmiento, Juan Ojeda

2008-01-01T23:59:59.000Z

204

Nuclear Materials Management and Safeguards System (NMMSS)  

SciTech Connect (OSTI)

This paper describes the Nuclear Materials Management and Safeguards System (NMMSS) which is sponsored by the Department of Energy and the Nuclear Regulatory Commission. The system serves national security and program management interests, and international interests in the programs for the peaceful application of nuclear energy and non-proliferation of nuclear weapons. Within the scope of the NMMSS are found all nuclear materials applied and controlled under United States law and related international agreements, including U.S. nuclear materials production programs and US private nuclear industrial activities. In addition, its national and international scope enables it to provide services to other organizations such as the Arms Control and Disarmament Agency, the Department of State, and the US Congress.

Jacobsen, S.E.; Matthews, W.B. III; McKamy, E.D.; Pedigo, R.B.

1991-01-01T23:59:59.000Z

205

ISO 50001 Conformant Energy Management Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ISO 50001-conformant ISO 50001-conformant Energy Management Systems Aimee McKane Lawrence Berkeley National Laboratory atmckane@lbl.gov 518-782-7002 April 2, 2013 2 | Building Technologies Office eere.energy.gov * Energy efficiency improvements with very favorable payback periods often do not get implemented due to competing organizational priorities * Even projects that are implemented may not be sustained due to lack of supportive operational and maintenance practices Problem: Energy efficiency is not integrated into daily

206

ISO 50001 Conformant Energy Management Systems  

Broader source: Energy.gov (indexed) [DOE]

ISO 50001-conformant ISO 50001-conformant Energy Management Systems Aimee McKane Lawrence Berkeley National Laboratory atmckane@lbl.gov 518-782-7002 April 2, 2013 2 | Building Technologies Office eere.energy.gov * Energy efficiency improvements with very favorable payback periods often do not get implemented due to competing organizational priorities * Even projects that are implemented may not be sustained due to lack of supportive operational and maintenance practices Problem: Energy efficiency is not integrated into daily

207

System and method for advanced power management  

DOE Patents [OSTI]

A power management system is provided that includes a power supply means comprising a plurality of power supply strings, a testing means operably connected to said plurality of power supply strings for evaluating performance characteristics of said plurality of power supply strings, and a control means for monitoring power requirements and comprising a switching means for controlling switching of said plurality of power supply strings to said testing means.

Atcitty, Stanley (Albuquerque, NM); Symons, Philip C. (Surprise, AZ); Butler, Paul C. (Albuquerque, NM); Corey, Garth P. (Albuquerque, NM)

2009-07-28T23:59:59.000Z

208

Definition: Meter Data Management System | Open Energy Information  

Open Energy Info (EERE)

System System Jump to: navigation, search Dictionary.png Meter Data Management System A meter data management system (MDMS) collects and stores meter data from a head-end system and processes that meter data into information that can be used by other utility applications including billing, customer information systems, and outage management systems. The MDMS is a key resource for managing large quantities of meter data.[1] Related Terms system, outage management system References ↑ https://www.smartgrid.gov/category/technology/meter_data_management_system [[Ca LikeLike UnlikeLike You like this.Sign Up to see what your friends like. tegory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Meter_Data_Management_System&oldid=50258

209

NO2 Management in Diesel Exhaust System | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

NO2 Management in Diesel Exhaust System NO2 Management in Diesel Exhaust System The project discusses the use of an NO2 mitigator for catalytic NO2 reduction deer09roberts.pdf...

210

Survey Report: Improving Integration of Program Management and Systems Engineering  

E-Print Network [OSTI]

For many years, a cultural barrier has existed between practitioners of systems engineering and of program management.  Some systems engineers and program managers have developed the mindset that their work activities ar ...

Conforto, Edivandro

211

Modern Data Processing for Management: a basic systems approach  

Science Journals Connector (OSTI)

......Modern Data Processing for Management: a basic systems approach J. O. Jenkins (London...Modern Data Processing for Management: a basic systems approach, by B. A. Hodson...Principles or Computer Science must approach the subject......

J. O. Jenkins

1974-11-01T23:59:59.000Z

212

ZERH Webinar: Quality Management Systems for ZERH | Department...  

Broader source: Energy.gov (indexed) [DOE]

Webinar: Quality Management Systems for ZERH ZERH Webinar: Quality Management Systems for ZERH October 16, 2014 12:00PM to 1:00PM EDT GoToWebinar The U.S. Department of Energy Zero...

213

Operations Directorate Integrated Safety and Environmental Management Systems  

E-Print Network [OSTI]

Operations Directorate Integrated Safety and Environmental Management Systems (ISEMS) Plan Directorate Integrated Safety and Environmental Management System (ISEMS) Plan The Operations Directorate, Operations Date #12;The Operations Directorate ISEMS Plan 032108 bf 2 Annual Review and Update Operations

Wechsler, Risa H.

214

Information System Security Manager (ISSM) | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

ISSM Core Competency Training Worksheet More Documents & Publications Information System Security Officer (ISSO) Cybersecurity Program Manager (CSPM) Authorizing Official (AO)...

215

Verification of Network Management System Configurations David L. Cohrs  

E-Print Network [OSTI]

Verification of Network Management System Configurations David L. Cohrs (608) 262-6617 dave domains too autonomous for this centralized approach. Distributing the network management system causes- ments. The NMSL system then operates in two roles: it verifies network management specifications

Miller, Barton P.

216

An Architectural Approach for Integrated Network and Systems Management  

E-Print Network [OSTI]

An Architectural Approach for Integrated Network and Systems Management Raouf Boutaba 1 and Simon introduce an architecture for the integrated management of all resources in a networked system, i that the networked system environment and its management tasks are appropriately structured. Therefore, we have

Boutaba, Raouf

217

CERTIFICATE OF APPROVAL Thisisto certifythat the Quality Management System of  

E-Print Network [OSTI]

CERTIFICATE OF APPROVAL Thisisto certifythat the Quality Management System of: Southwest Research been approved by Lloyd's Register Quality Assurance to the following Quality Management System Standards: ISO 9001 :2008 ANSIIISO/ ASQ Q9001-2008 The Quality Management System is applicable to: Research

Chapman, Clark R.

218

Wie beantrage ich das Zertifikat ,,Quality System Manager Junior"  

E-Print Network [OSTI]

Wie beantrage ich das Zertifikat ,,Quality System Manager Junior" und was kostet es Jochem DGQ Quality System Manager - Junior - Die Zusatzqualifikation für Studierende der Technischen Universität Berlin #12;Was ist der Quality Systems Manager - Junior -? Die Bedeutung des Qualitätsmanagements

Berlin,Technische Universität

219

A Spatial Planning and Analysis System for Wildland Fire Management  

E-Print Network [OSTI]

STARFIRE 11/29/2011 A Spatial Planning and Analysis System for Wildland Fire Management Welcome is an advanced and powerful spatial fire management planning and analysis system which is designed to provide visual and analytic support for fire management planning, decisions and communication. The system

220

Managing Uncertainty in Operational Control of Water Distribution Systems  

E-Print Network [OSTI]

Managing Uncertainty in Operational Control of Water Distribution Systems A. Bargiela Department. There are system management decisions concerning the regulatory measures such as water pricing principles, effluent in water distribution systems con- cern reservoir(s) management with associated pump scheduling

Bargiela, Andrzej

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Objectives & Targets Rev. 7/17/13 Objectives & Targets Rev. 7/17/13 ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS 2012 PROGRESS REPORT for SOUTHWESTERN POWER ADMINISTRATION Activity Legal Requirement Aspect Objective Target** see important note Target Achieved Details Real Estate Management DOE O 436.1 E.O. 13423 & 13514 EPAct 1992 and 2005 EISA 2007 NECPA 1978 Natural resource depletion and GHG emissions from resource intensive facilities Increase sustainability of facility resources, reduce energy and water consumption, reduce impacts to natural resources from facility usage 1) Meter 90% of electricity by September 2012 2) Meter 90% of gas, steam, and water by September 2015 3) 30% energy intensity reduction by 2015 from baseline 2003 4) Reduce water consumption intensity 2%

222

Business Manangement System(BMS), RL-2008/Project Hanford Management...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Business Manangement System(BMS), RL-2008Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008...

223

V-125: Cisco Connected Grid Network Management System Multiple...  

Broader source: Energy.gov (indexed) [DOE]

System 2.x ABSTRACT: Some vulnerabilities have been reported in Cisco Connected Grid Network Management System. REFERENCE LINKS: Cisco Security Notice CVE-2013-1163 Cisco...

224

Business Manangement System(BMS), RL-2008/Project Hanford Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Manangement System(BMS), RL-2008/Project Hanford Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer More Documents & Publications iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management PIA - Security Clearance Work Tracking and Budget System Office of Personnel Management (OPM) Billing System PIA, Office of Health,

225

System Demand-Side Management: Regional results  

SciTech Connect (OSTI)

To improve the Bonneville Power Administration's (Bonneville's) ability to analyze the value and impacts of demand-side programs, Pacific Northwest Laboratory (PNL) developed and implemented the System Demand-Side Management (SDSM) model, a microcomputer-based model of the Pacific Northwest Public Power system. This document outlines the development and application of the SDSM model, which is an hourly model. Hourly analysis makes it possible to examine the change in marginal revenues and marginal costs that accrue from the movement of energy consumption from daytime to nighttime. It also allows a more insightful analysis of programs such as water heater control in the context of hydroelectric-based generation system. 7 refs., 10 figs., 10 tabs.

Englin, J.E.; Sands, R.D.; De Steese, J.G.; Marsh, S.J.

1990-05-01T23:59:59.000Z

226

"Beyond HTML: Developing and re-imagining library web guides in a content management system  

E-Print Network [OSTI]

with a content management system. ” Texas Library Journal,Web content management systems: evolution, lifecycle andIN A CONTENT MANAGEMENT SYSTEM Doug Goans (dgoans@gsu.edu)

Goans, Doug; Leach, Guy; Vogel, Teri M.

2006-01-01T23:59:59.000Z

227

Faculty of Medicine Health Research Data and Systems Management (HRDSM)  

E-Print Network [OSTI]

Faculty of Medicine Health Research Data and Systems Management (HRDSM) Core Facility Governance technical manager who reports to the Associate Dean, Research. The HRDSM Core Facility is supported by a Users Management Committee that meets at least four times annually. Users Management Committee: Terms

Brownstone, Rob

228

Facilities Information Management System (FIMS) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Facilities Information Management System Facilities Information Management System (FIMS) Facilities Information Management System (FIMS) FIMS is DOE's corporate database for real property as required by DOE Order 430.1B, Real Property Asset Management. The system provides DOE with an accurate inventory and management tool that assists with planning and managing all current real property assets. The DOE Office of Acquisition and Project Management, the Office of Management and Budget, Congress, and other Federal entities use the real property data reported through FIMS. All Office of Legacy Management (LM) real property assets (buildings, trailers, other structures, and land) are entered into FIMS at the time they are acquired. Annually LM is required to update maintenance cost, operating cost, replacement cost, and utilization details for each asset.

229

The Dark Energy Survey Data Management System  

SciTech Connect (OSTI)

The Dark Energy Survey (DES) is a project with the goal of building, installing and exploiting a new 74 CCD-camera at the Blanco telescope, in order to study the nature of cosmic acceleration. It will cover 5000 square degrees of the southern hemisphere sky and will record the positions and shapes of 300 million galaxies up to redshift 1.4. The survey will be completed using 525 nights during a 5-year period starting in 2012. About O(1 TB) of raw data will be produced every night, including science and calibration images. The DES data management system has been designed for the processing, calibration and archiving of these data. It is being developed by collaborating DES institutions, led by NCSA. In this contribution, we describe the basic functions of the system, what kind of scientific codes are involved and how the Data Challenge process works, to improve simultaneously the Data Management system algorithms and the Science Working Group analysis codes.

Sevilla, I.; /Madrid, CIEMAT; Armstrong, R.; Jarvis, M.; /Pennsylvania U.; Bertin, E.; /Paris, Inst. Astrophys.; Carlson, A.; Desai, S.; Mohr, J.; /Munich U.; Daues, G.; Gower, M.; Gruendl, R.; Petravick, D.; /Illinois U., Urbana /Illinois U., Urbana /Chicago U. /Fermilab /Brookhaven /Harvard-Smithsonian Ctr. Astrophys.

2011-09-01T23:59:59.000Z

230

Civilian Radioactive Waste Management System Requirements Document  

SciTech Connect (OSTI)

The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible for design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.

C.A. Kouts

2006-05-10T23:59:59.000Z

231

T OF ENERGY EERE PROJECT MANAG EM ENT CENT ER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

DEPARTJ\ffiN DEPARTJ\ffiN T OF ENERGY EERE PROJECT MANAG EM ENT CENT ER NEPA DETERMINATION RECIPIENT:BISON GEAR & ENG PROJECT TITLE; HYPOID GEAR MOTOR PLATFORM Page 1 of2 .; STATE: IL Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-OOOOO52 EEOOOO1 19 EE119 Based on my review of the infonnation concerning the proposed action, as NEPA Compliance Officer (aulhoriud under DOE Order 451.1A), I have made the following detennination: ex. EA, EIS APPENDIX AND NUMBER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially hannful substances. These actions may involve financial and technical

232

u.s. DEPARHIENT OF ENERGY EE RE PROJECT MANAG EM ENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

DEPARHIENT OF ENERGY DEPARHIENT OF ENERGY EE RE PROJECT MANAG EM ENT CENTER NEPA DETERl\.-IINATION Page I of2 RECIPIENT:Fort Bend County STATE: TX PROJECT TITLE: Energy Efficiency Conservation Block Grant Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE·EEOOOQ916 DE-EE0000916 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order451.1A), I have made tbe following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do nol increase the indoor concentrations of potentially hannful substances. These actions may involve financial and technical

233

u.s. DEPARUvlllNT OF ENER GY EE RE PROJECT MANAG EM ENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

DEPARUvlllNT OF ENER DEPARUvlllNT OF ENER GY EE RE PROJECT MANAG EM ENT CENTER NEPA DETERl\IlNATION RECIPIENT:MI Department of Energy, Labor & Economic Growth PROJECT TITL E : SEP - Green Chemistry - CEAM Phase 3 - KTM Industries Page 1 oI2 STATE: Ml Funding Opportunity Announcement Number DE-FOA-OOOOO52 Procurement Instrument Number DE-EEOOOO166 NEPA Control Number em Num ber GFO-OOOO166-032 GOO Based on my review of the information concerning the proposed ac tion, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination : ex, EA, [IS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

234

Global Fraud Management System (GFMS) AT&T Global Fraud Management System is a robust suite of data mining and management  

E-Print Network [OSTI]

AT&T technology solutions Global Fraud Management System (GFMS) AT&T Global Fraud Management System is a robust suite of data mining and management applications developed by AT&T Labs to reduce fraud offer a user-friendly interface · Centralized alert manager creates an immediate alert when fraud

Fisher, Kathleen

235

Building Technologies Office: Building-Level Energy Management Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building-Level Energy Building-Level Energy Management Systems Research Project to someone by E-mail Share Building Technologies Office: Building-Level Energy Management Systems Research Project on Facebook Tweet about Building Technologies Office: Building-Level Energy Management Systems Research Project on Twitter Bookmark Building Technologies Office: Building-Level Energy Management Systems Research Project on Google Bookmark Building Technologies Office: Building-Level Energy Management Systems Research Project on Delicious Rank Building Technologies Office: Building-Level Energy Management Systems Research Project on Digg Find More places to share Building Technologies Office: Building-Level Energy Management Systems Research Project on AddThis.com... About Take Action to Save Energy

236

New and Underutilized Technology: Computer Power Management Systems |  

Broader source: Energy.gov (indexed) [DOE]

Computer Power Management Systems Computer Power Management Systems New and Underutilized Technology: Computer Power Management Systems October 7, 2013 - 9:08am Addthis The following information outlines key deployment considerations for computer power management systems within the Federal sector. Benefits Computer power management systems include network-based software that manages computer power consumption by automatically putting them in standby, hibernation, or other low energy consuming state without interfering with user productivity or IT functions. Application Computer power management systems are applicable in most building categories with high computer counts. Key Factors for Deployment Life-cycle cost effectiveness studies are recommended prior to deployment. Ranking Criteria Federal energy savings, cost-effectiveness, and probability of success are

237

U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DEIERJ\lINATION  

Broader source: Energy.gov (indexed) [DOE]

1.1I0:. 1.1I0:. U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DEIERJ\lINATION RECIPIENT:Energy and Geoscience Institute at the University of Utah PROJECf TITLE: Quantum Dot Tracers for Use in Engineered Geothermal Systems Page 1 of2 STATE: UT Funding Opportunity Announcement Number Procurement Instrument Numbu NEPA Control Number CID Number DE-FOA-EEOOOOO75 DE-EEOOO2768 GF0-10-354 0 Based on my Tn'icw oftbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Ordcr45I.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 83.6 Siting, construction (or modification), operation, and decommissioning of facilities for indoor bench-scale research projects and conventional laboratory operations (for example, preparation of chemical standards and sample analysis):

238

An Open-Source Learning Content Management and Assessment System  

E-Print Network [OSTI]

LON-CAPA An Open-Source Learning Content Management and Assessment System Gerd Kortemeyer-CAPA is free open-source a learning content management system an assessment system around since 1992 #12 and �merson Cruz Michigan State University #12;Overview Presentation Outline: ·System Overview

239

Earned Value Management System RM | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Earned Value Management System RM Earned Value Management System RM Earned Value Management System RM In recent years Department of Energy (DOE) has developed a number of orders, and guidance documents aimed to improve the overall performance of project management and the acquisition of capital assets with the DOE complex. One of the most important activities or products required by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assess, to strengthen the overall performance of project management and the acquisition of capital assets is the Earned Value Management System (EVMS). EVMS allows both government and contractor managers to gain significant insights into technical, cost, and schedule progress of contracts and projects. The implementation of an EVMS is widely recognized

240

Earned Value Management System RM | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Earned Value Management System RM Earned Value Management System RM Earned Value Management System RM In recent years Department of Energy (DOE) has developed a number of orders, and guidance documents aimed to improve the overall performance of project management and the acquisition of capital assets with the DOE complex. One of the most important activities or products required by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assess, to strengthen the overall performance of project management and the acquisition of capital assets is the Earned Value Management System (EVMS). EVMS allows both government and contractor managers to gain significant insights into technical, cost, and schedule progress of contracts and projects. The implementation of an EVMS is widely recognized

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Applications of Social Systems Modeling to Political Risk Management  

Science Journals Connector (OSTI)

Risk is inexplicably linked to complex inter-related ... and human factors would be immensely valuable to risk management. A social system model constructed with ... tools could be applied to assess and manage political

Gnana K. Bharathy; Barry Silverman

2012-01-01T23:59:59.000Z

242

Utility system integration and optimization models for nuclear power management  

E-Print Network [OSTI]

A nuclear power management model suitable for nuclear utility systems optimization has been developed for use in multi-reactor fuel management planning over periods of up to ten years. The overall utility planning model ...

Deaton, Paul Ferris

1973-01-01T23:59:59.000Z

243

Design of a Computerized Energy Management System for Marine Applications  

E-Print Network [OSTI]

A computer-based energy management system for marine applications is presented. The problem of fuel-management for large diesel engines on board ship is discussed. The design of the computer hardware and software are presented including...

Russell, B. D.; Perry, L. W.; Gerloff, G. W.; Heller, R. P.; Pankonien, G.

1982-01-01T23:59:59.000Z

244

Departmental Integrated Safety Management System (9-23-10)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This directive will convert and consolidate DOE M 450.4-1, Integrated Safety Management System Manual and DOE M 411.1-1C, Safety Management Functions, Responsibilities, and Authorities Manual into a single Order.

2010-09-23T23:59:59.000Z

245

Contract Management Using Industrial Energy Management & Reporting Systems  

E-Print Network [OSTI]

contracts in complex business relationships. This paper explores the integration of the EMRS qualification process and implementation of EMRS in large corporate structures with examples of contract management for some surprising results....

Robinson, J. E.

2011-01-01T23:59:59.000Z

246

u.s. DEPART1IENT OF ENERGY EERE PROJECT MANAG EM ENT CEN T ER  

Broader source: Energy.gov (indexed) [DOE]

EERE PROJECT MANAG EERE PROJECT MANAG EM ENT CEN T ER NEPA DETER1.IINATION RECIPIENT:TEXAS COMPTROLLER OF PUBLIC ACCOUNTS PROJECT TITLE: ARRA SEP CITY OF ADDISON TURBINE PROJECT Page 1 of2 STATE: TX Funding Opportunity AnDouncement Number Proc:urcmentlnstrumcnt Number NEPA Control Number CID Number DE·EEOOOO116 EEOOOO116 EE116 Based on my review oftbe informatioll concerning the proposed action, as NEPA Compliance Officer (authoriud under DOE Order 4Sl.IA), I ban made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including. but not limited to, literature surveys, inventories, audits). dala analysis (including computer modeling). document preparation (such as conceptual design or feasibility studies, analytical energy supply

247

Federal Energy Management Program: EISA Compliance Tracking System Reports  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EISA Compliance EISA Compliance Tracking System Reports and Data to someone by E-mail Share Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Facebook Tweet about Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Twitter Bookmark Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Google Bookmark Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Delicious Rank Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Digg Find More places to share Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on AddThis.com... Requirements by Subject Requirements by Regulation Notices & Rules

248

Nuclear Energy CFD Application Management System  

SciTech Connect (OSTI)

In modeling and simulation (M&S), it is virtually impossible to separately evaluate the effectiveness of the model from the data used because the results produced rely heavily on the interaction between the two. Both the data and the simulation are responsible for achieving the ultimate goal of providing defensible research and development (R&D) products and decisions. It is therefore vital that data verification and validation (V&V) activities, along with stringent configuration management, be considered part of the overall M&S accreditation process. In support of these goals is the Nuclear Energy CFD Application Management System (NE-CAMS) for nuclear system design and safety analysis. Working with Bettis Laboratory and Utah State University, a plan of action is being developed by the Idaho National Laboratory (INL) that will address the highest and most immediate needs to track and manage computational fluid dynamics (CFD) models and experimental data in an electronic database. The database will intrinsically incorporate the Nuclear Regulatory Commission (NRC) approved policies and procedures for quality. The quality requirements will be such that the model and data must conform to the quality specifications outlined by the NRC before they can be entered into the database. The primary focus of this database is CFD V&V for nuclear industry needs and will, in practice, serve as the best practice guideline that will accommodate NRC regulations. Such a database, along with a prescriptive methodology for how to utilize it, will provide the NRC with accepted CFD results that could potentially be used for licensing. NE-CAMS will incorporate data V&V as key precursors to the distribution of nuclear systems design and safety data, ensuring that these data are appropriate for use in a particular M&S application. Verification will be conducted to provide a level of confidence that the data selected are the most appropriate for the simulation and are properly prepared, i.e., they are complete, correct and conform to predefined procedures and requirements. Validation will ensure that the data accurately represent the real world activity that is being simulated, ensuring the analytical quality of the data. The level of detail and stringency applied against the data V&V activities will be based on a graded approach principle; the higher the risk, the more rigorous the V&V activities. For the V&V activities to be complete, it will be necessary to scrutinize the physical and statistical properties of the extracted data during the overall process. Regardless of the specific technique or methodology, data V&V will be an important component of NE-CAMS.

Hyung Lee; Kimberlyn C. Mousseau

2001-09-01T23:59:59.000Z

249

Introduction Operations Management of Blood Banking Systems Blood Banking Systems Network Design Supply Chain Network  

E-Print Network [OSTI]

Introduction Operations Management of Blood Banking Systems Blood Banking Systems Network Design Supply Chain Network Operations Management and Design of A Sustainable Blood Banking System Amir Masoumi of Massachusetts Amherst #12;Introduction Operations Management of Blood Banking Systems Blood Banking Systems

Nagurney, Anna

250

Integrated Building Management System (IBMS) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Building Management System Building Management System (IBMS) Integrated Building Management System (IBMS) The U.S. Department of Energy (DOE) is currently conducting research into an integrated building management system (IBMS). Project Description This project seeks to develop an open integration framework that allows multivendor systems to interoperate seamlessly using internet protocols. The applicant will create an integrated control platform for implementing new integrated control strategies and to enable additional enterprise control applications, such as demand response. The project team seeks to develop several strategies that take advantage of the sensors and functionality of heating, ventilation, and air conditioning (HVAC); security; and information and communication technologies (ICT) subsystems;

251

The Dark Energy Survey Data Management System  

SciTech Connect (OSTI)

The Dark Energy Survey (DES) collaboration will study cosmic acceleration with a 5000 deg2 griZY survey in the southern sky over 525 nights from 2011-2016. The DES data management (DESDM) system will be used to process and archive these data and the resulting science ready data products. The DESDM system consists of an integrated archive, a processing framework, an ensemble of astronomy codes and a data access framework. We are developing the DESDM system for operation in the high performance computing (HPC) environments at the National Center for Supercomputing Applications (NCSA) and Fermilab. Operating the DESDM system in an HPC environment offers both speed and flexibility. We will employ it for our regular nightly processing needs, and for more compute-intensive tasks such as large scale image coaddition campaigns, extraction of weak lensing shear from the full survey dataset, and massive seasonal reprocessing of the DES data. Data products will be available to the Collaboration and later to the public through a virtual-observatory compatible web portal. Our approach leverages investments in publicly available HPC systems, greatly reducing hardware and maintenance costs to the project, which must deploy and maintain only the storage, database platforms and orchestration and web portal nodes that are specific to DESDM. In Fall 2007, we tested the current DESDM system on both simulated and real survey data. We used TeraGrid to process 10 simulated DES nights (3TB of raw data), ingesting and calibrating approximately 250 million objects into the DES Archive database. We also used DESDM to process and calibrate over 50 nights of survey data acquired with the Mosaic2 camera. Comparison to truth tables in the case of the simulated data and internal crosschecks in the case of the real data indicate that astrometric and photometric data quality is excellent.

Mohr, Joseph J.; /Illinois U., Urbana, Astron. Dept. /Illinois U., Urbana; Barkhouse, Wayne; /North Dakota U.; Beldica, Cristina; /Illinois U., Urbana; Bertin, Emmanuel; /Paris, Inst. Astrophys.; Dora Cai, Y.; /NCSA, Urbana; Nicolaci da Costa, Luiz A.; /Rio de Janeiro Observ.; Darnell, J.Anthony; /Illinois U., Urbana, Astron. Dept.; Daues, Gregory E.; /NCSA, Urbana; Jarvis, Michael; /Pennsylvania U.; Gower, Michelle; /NCSA, Urbana; Lin, Huan; /Fermilab /Rio de Janeiro Observ.

2008-07-01T23:59:59.000Z

252

LED lamp power management system and method  

DOE Patents [OSTI]

An LED lamp power management system and method including an LED lamp having an LED controller 58; a plurality of LED channels 60 operably connected to the LED controller 58, each of the plurality of LED channels 60 having a channel switch 62 in series with at least one shunted LED circuit 83, the shunted LED circuit 83 having a shunt switch 68 in parallel with an LED source 80. The LED controller 58 reduces power loss in one of the channel switch 62 and the shunt switch 68 when LED lamp electronics power loss (P.sub.loss) exceeds an LED lamp electronics power loss limit (P.sub.lim); and each of the channel switches 62 receives a channel switch control signal 63 from the LED controller 58 and each of the shunt switches 68 receives a shunt switch control signal 69 from the LED controller 58.

Gaines, James; Clauberg, Bernd; Van Erp, Josephus A. M.

2013-03-19T23:59:59.000Z

253

V-132: IBM Tivoli System Automation Application Manager Multiple  

Broader source: Energy.gov (indexed) [DOE]

2: IBM Tivoli System Automation Application Manager Multiple 2: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 - 6:00am Addthis PROBLEM: IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security vulnerabilities exist in the IBM Java Runtime Environment component of IBM Tivoli System Automation Application Manager which may affect the product REFERENCE LINKS: Secunia Advisory: SA53006 IBM Security Bulletin 21633991 IBM Security Bulletin 21633992 CVE-2011-3563 CVE-2012-0497 CVE-2012-0498 CVE-2012-0499 CVE-2012-0501

254

Practical Ocean Energy Management Systems Inc POEMS | Open Energy  

Open Energy Info (EERE)

Ocean Energy Management Systems Inc POEMS Ocean Energy Management Systems Inc POEMS Jump to: navigation, search Name Practical Ocean Energy Management Systems Inc (POEMS) Place San Diego, California Zip 92138 Sector Ocean, Renewable Energy Product POEMS was formed to involve the public in providing support for the development of ocean energy as a viable component of the renewable energy market. References Practical Ocean Energy Management Systems Inc (POEMS)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Practical Ocean Energy Management Systems Inc (POEMS) is a company located in San Diego, California . References ↑ "Practical Ocean Energy Management Systems Inc (POEMS)" Retrieved from

255

V-132: IBM Tivoli System Automation Application Manager Multiple  

Broader source: Energy.gov (indexed) [DOE]

2: IBM Tivoli System Automation Application Manager Multiple 2: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 - 6:00am Addthis PROBLEM: IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security vulnerabilities exist in the IBM Java Runtime Environment component of IBM Tivoli System Automation Application Manager which may affect the product REFERENCE LINKS: Secunia Advisory: SA53006 IBM Security Bulletin 21633991 IBM Security Bulletin 21633992 CVE-2011-3563 CVE-2012-0497 CVE-2012-0498 CVE-2012-0499 CVE-2012-0501

256

V-125: Cisco Connected Grid Network Management System Multiple  

Broader source: Energy.gov (indexed) [DOE]

5: Cisco Connected Grid Network Management System Multiple 5: Cisco Connected Grid Network Management System Multiple Vulnerabilities V-125: Cisco Connected Grid Network Management System Multiple Vulnerabilities April 3, 2013 - 1:44am Addthis PROBLEM: Cisco Connected Grid Network Management System Multiple Vulnerabilities PLATFORM: Cisco Connected Grid Network Management System 2.x ABSTRACT: Some vulnerabilities have been reported in Cisco Connected Grid Network Management System. REFERENCE LINKS: Cisco Security Notice CVE-2013-1163 Cisco Security Notice CVE-2013-1171 Secunia Advisory SA52834 SecurityTracker Alert ID: 1028374 SecurityTracker Alert ID: 1028373 CVE-2013-1163 CVE-2013-1171 IMPACT ASSESSMENT: Medium DISCUSSION: 1) Certain input related to the element list component is not properly sanitised before being returned to the user. This can be exploited to

257

V-125: Cisco Connected Grid Network Management System Multiple  

Broader source: Energy.gov (indexed) [DOE]

5: Cisco Connected Grid Network Management System Multiple 5: Cisco Connected Grid Network Management System Multiple Vulnerabilities V-125: Cisco Connected Grid Network Management System Multiple Vulnerabilities April 3, 2013 - 1:44am Addthis PROBLEM: Cisco Connected Grid Network Management System Multiple Vulnerabilities PLATFORM: Cisco Connected Grid Network Management System 2.x ABSTRACT: Some vulnerabilities have been reported in Cisco Connected Grid Network Management System. REFERENCE LINKS: Cisco Security Notice CVE-2013-1163 Cisco Security Notice CVE-2013-1171 Secunia Advisory SA52834 SecurityTracker Alert ID: 1028374 SecurityTracker Alert ID: 1028373 CVE-2013-1163 CVE-2013-1171 IMPACT ASSESSMENT: Medium DISCUSSION: 1) Certain input related to the element list component is not properly sanitised before being returned to the user. This can be exploited to

258

Optimal Shipboard Power System Management via Mixed Integer Dynamic Programming  

E-Print Network [OSTI]

Optimal Shipboard Power System Management via Mixed Integer Dynamic Programming Harry G. Kwatny' power systems using a logical specification to define the transition dynamics of the discrete subsystem following component failure(s) is a central goal of power system management including electric shipboard

Kwatny, Harry G.

259

A Database Management System for the Federal Courts  

E-Print Network [OSTI]

A Database Management System for the Federal Courts JACK R. BUCHANAN, RICHARD D. FENNELL Federal Making Information Systems, Inc., McLean, VA 22101; R. D. Fennell, Federal Judicial Center, Washington, D and several large-scale information management systems projects have been undertaken within the Federal

Samet, Hanan

260

An Open-Source Learning Content Management and Assessment System  

E-Print Network [OSTI]

LON-CAPA An Open-Source Learning Content Management and Assessment System Gerd Kortemeyer Michigan State University #12;LON-CAPA Overview · LON-CAPA is free open-source a learning content management system an assessment system around since 1992 #12;Free and Open-Source · Free: "Free beer

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Mobile Model-Based Bridge Lifecycle Management Systems  

E-Print Network [OSTI]

Mobile Model-Based Bridge Lifecycle Management Systems Amin Hammad* , Cheng Zhang, Yongxin Hu, Montreal, Quebec, Canada H3G 1T7, Canada Abstract: This paper discusses the requirements for developing Mobile Model-based Bridge Lifecycle Management Systems (MMBLMSs). These new systems should link all

Hammad, Amin

262

Performance Modeling and Access Methods for Temporal Database Management Systems  

E-Print Network [OSTI]

implementation issues. Database systems with temporal support maintain history data on line together with current. Performance Modeling and Access Methods for Temporal Database Management Systems TR86-018 August. #12;Performance Modeling and Access Methods for Temporal Database Management Systems by Ilsoo Ahn

North Carolina at Chapel Hill, University of

263

Energy Management for Motor-Driven Systems  

Broader source: Energy.gov [DOE]

This document assists in establishing an energy management plan, identifying energy savings opportunities, and designing a motor improvement plan.

264

Battery Thermal Management System Design Modeling  

SciTech Connect (OSTI)

Looks at the impact of cooling strategies with air and both direct and indirect liquid cooling for battery thermal management.

Pesaran, A.; Kim, G. H.

2006-11-01T23:59:59.000Z

265

The Comandos Toolset for Distributed Systems Management  

Science Journals Connector (OSTI)

......Hoffner, Y. (1992) Management in Object-Based Federated...1988) Construction and management of distributed office...MEITNER AND F. REIM approach. In Proc. Int. Workshop...die Gestaltung und das Management verteilter Informationssysteme...374-378, Elsevier Science Publishers, Amsterdam......

Gerrit Kerber; Helmut Meitner; Friedemann Reim

1994-01-01T23:59:59.000Z

266

Systems Engineering Management Plan for the Tank Farm Contractor  

SciTech Connect (OSTI)

This plan describes the systems engineering process to develop and manage the technical baseline. It defines the documents, interfaces, and procedures used by the Tank Farm Contractor.

O'TOOLE, S.M.

2000-04-20T23:59:59.000Z

267

Management System for Operations Mantenanace in Offshore Wind Turbine Plant.  

E-Print Network [OSTI]

?? Management system for enhancing transfer of knowledge in wind power industry has not received sufficient research attention in recent times. In some cases, the… (more)

Ghanbari, Ahmad

2012-01-01T23:59:59.000Z

268

PIA - EERE Infrastructure-EERE Reviewer Management System | Department...  

Office of Environmental Management (EM)

Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - HSPD-12 Physical and Logical Access System PIA - Bonneville Power Adminstration Ethics Helpline...

269

NTC Launches New eLearning Management System  

Broader source: Energy.gov [DOE]

The National Training Center is committed to producing high quality eLearning courses available to students for free on our Learning Management System (LMS).

270

Official Knowledge: Validation Mechanisms for Knowledge Management Systems.  

E-Print Network [OSTI]

??One of the most important roles of a knowledge management system is as a filter to verify, authenticate, or justify the knowledge of an organization.… (more)

Watkins, Jennifer H

2009-01-01T23:59:59.000Z

271

Load Shedding in Data Stream Management Systems Using Application Semantics  

Science Journals Connector (OSTI)

Data Stream Management Systems (DSMSs) process highly ... literature, including capacity planning, scheduling, and load shedding. Existing load shedding approaches drop tuples either randomly or based on the char...

Raman Adaikkalavan

2012-01-01T23:59:59.000Z

272

Local-Level Prognostics Health Management Systems Framework for...  

Office of Scientific and Technical Information (OSTI)

Health Management Systems Framework for Passive AdvSMR Components - Interim Report Re-direct Destination: Temp Data Fields Ramuhalli, Pradeep; Roy, Surajit; Hirt, Evelyn...

273

The Certification Information System: Managing Chain-of-Custody  

E-Print Network [OSTI]

-based Information Interchange #12;Transition To CIS-Based Certification Channel Management Buyer CIS Based LogisticsThe Certification Information System: Managing Chain-of-Custody Lucie K. Ozanne, Ph.D. Senior of chain-of-custody (COC) specifications. COC is a materials management and production exercise. COC

274

Division of Information Information Systems Documentation Enterprise Systems Management Framework Version 6.0  

E-Print Network [OSTI]

Division of Information Information Systems Documentation Enterprise Systems Management Framework Version 6.0 Enterprise Systems Management Framework Version: 6.0 Date: 2 Jan 2008 Status: Endorsed Systems Management Framework Version 6.0 DOCUMENT DETAILS Document Number CIS 0002/200504466 Document

Botea, Adi

275

Management of Control System Information SecurityI: Control System Patch Management  

SciTech Connect (OSTI)

The use of information technologies in control systems poses additional potential threats due to the frequent disclosure of software vulnerabilities. The management of information security involves a series of policy-making on the vulnerability discovery, disclosure, patch development and patching. In this paper, we use a system approach to devise a model to understand the interdependencies of these decision processes. In more details, we establish a theoretical framework for making patching decision for control systems, taking into account the requirement of functionability of control systems. We illustrate our results with numerical simulations and show that the optimal operation period of control systems given the currently estimated attack rate is roughly around a half a month.

Quanyan Zhu; Miles McQueen; Craig Rieger; Tamer Basar

2011-09-01T23:59:59.000Z

276

Federal Emergency Management Information system (FEMIS) data management guide. Version 1.2  

SciTech Connect (OSTI)

The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Chemical and Biological Defense Command. The FEMIS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain the data resources in the system. Database administrators, system administrators, and general users can use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of FEMIS. This document provides a description of the relational and spatial information present in FEMIS. It describes how the data was assembled, how it is loaded, and how it is managed while the system is in operation.

Burnett, R.A.; Downing, T.R.; Gaustad, K.L.; Johnson, S.M.; Loveall, R.M.; Winters, C.

1996-05-01T23:59:59.000Z

277

You Cannot Manage What You Cannot Measure: An Information Systems Based Asset Management Perspective  

Science Journals Connector (OSTI)

Measuring the impact of implementation of information systems for asset management is a complex issue; due to the stochastic nature of process variables, substantial effects of information systems on the way u...

Abrar Haider; Andy Koronios; Gerald Quirchmayr

2006-01-01T23:59:59.000Z

278

LRRB Pavement Management SystemsTraffic Generator Managing Interaction Between Local  

E-Print Network [OSTI]

% of their energy from renewable sources by 2025. #12;LRRB Pavement Management SystemsTraffic Generator MN Wind Resource #12;LRRB Pavement Management SystemsTraffic Generator Wind Power (continued) · Advantage: · Energy Anderson, Stearns County Deb Bloom, City of Roseville Bruce Hasbargen, Lk of Woods Cty Steve Koehler, City

Minnesota, University of

279

Systems Theory and Knowledge Management Systems: The Case of Pratt-Whitney Rocketdyne  

Science Journals Connector (OSTI)

edge management (KM) systems, many managers are still unsure how they can implement a KM system that will effectively contribute to the firm's competitive ad- vantage. A common framework is one that breaks down KM into four main activities: knowledge ...

Mark Chun; Kiho Sohn; Priscilla Arling; Nelson F. Granados

2008-01-01T23:59:59.000Z

280

Recommended Practice for Patch Management of Control Systems  

SciTech Connect (OSTI)

A key component in protecting a nation’s critical infrastructure and key resources is the security of control systems. The term industrial control system refers to supervisory control and data acquisition, process control, distributed control, and any other systems that control, monitor, and manage the nation’s critical infrastructure. Critical Infrastructure and Key Resources (CIKR) consists of electric power generators, transmission systems, transportation systems, dam and water systems, communication systems, chemical and petroleum systems, and other critical systems that cannot tolerate sudden interruptions in service. Simply stated, a control system gathers information and then performs a function based on its established parameters and the information it receives. The patch management of industrial control systems software used in CIKR is inconsistent at best and nonexistent at worst. Patches are important to resolve security vulnerabilities and functional issues. This report recommends patch management practices for consideration and deployment by industrial control systems owners.

Steven Tom; Dale Christiansen; Dan Berrett

2008-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Harrison Radiator Division's Energy Management, Reporting and Accounting System  

E-Print Network [OSTI]

HARRISON RADIATOR DIVISION'S ENERGY MANAGEMENT, REPORTING and ACCOUNTING SYSTEM Ronald J. Goubeaux Harrison Radiator Division Lockport, New York ABSTRACT Energy management is essential for obtaining the lowest possible product..., farm equipment, small aircraft and other types of vehicles. The energy management, reporting and accounting system that is covered in this paper is operating in Harrison's West Complex of the New York Operations located in Lockport, Western...

Goubeaux, R. J.

282

Trends in Energy Management Technology - Part 3: State of Practiceof Energy Management, Control, and Information Systems  

SciTech Connect (OSTI)

In this report, the third in a series, we provide an evaluation of several products that exemplify the current state of practice of Energy Management, Control, and Information Systems (EMCIS). The available features for these products are summarized and analyzed with regard to emerging trends in EMCIS and potential benefits to the federal sector. The first report [1] covered enabling technologies for emerging energy management systems. The second report [2] serves as a basic reference for building control system (BCS) networking fundamentals and includes an assessment of current approaches to open communications. Part 4 of this series will discuss applications software from a user's perspective. It is important for energy managers in the Federal sector to have a high level of knowledge and understanding of these complex energy management systems. This series of reports provides energy practitioners with some basic informational and educational tools to help make decisions relative to energy management systems design, specification, procurement, and energy savings potential.

Yee, Gaymond; Webster, Tom

2004-02-01T23:59:59.000Z

283

Configuration Management and Version Control in Earth System Modelling  

Science Journals Connector (OSTI)

This section discusses the process of developing and constructing Earth System Models (ESMs). The construction of an ESM...configuration management (CM), the process of handling change in software systems wh...

Mick Carter; Dave Matthews

2012-01-01T23:59:59.000Z

284

Inventory management with dynamic Bayesian network software systems  

E-Print Network [OSTI]

Inventory management with dynamic Bayesian network software systems Mark Taylor1 and Charles Fox2 1.fox@sheffield.ac.uk Abstract. Inventory management at a single or multiple levels of a supply chain is usually performed-the-shelf graphical software systems. We show how such sys- tems may be deployed to model a simple inventory problem

Barker, Jon

285

Aviation Safety + Security Program GLOBAL EXPERTS IN SAFETY MANAGEMENT SYSTEMS  

E-Print Network [OSTI]

2010- 2011 Aviation Safety + Security Program GLOBAL EXPERTS IN SAFETY MANAGEMENT SYSTEMS Relevance and currency -- that is what drives the Aviation Safety and Security Program of the USC Viterbi that our core course, Aviation Safety Management Systems, is so necessary in ensuring the safety

Wang, Hai

286

Quality management system in the CIEMAT Radiation Dosimetry Service  

Science Journals Connector (OSTI)

......spectrometry (NaI (Tl), low energy germanium and Fastscan detection...management system, an external auditor made a revision of the initial...CSN. 4 International Atomic Energy Agency. The management system...GS-R-3. 5 Internatinal Atomic Energy Agency. Application of the......

R. Martín; T. Navarro; A. M. Romero; M. A. López

2011-03-01T23:59:59.000Z

287

Configuration management program plan for Hanford site systems engineering  

SciTech Connect (OSTI)

This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

Kellie, C.L.

1996-03-28T23:59:59.000Z

288

Original article Characterisation of apple orchard management systems  

E-Print Network [OSTI]

Original article Characterisation of apple orchard management systems in a French Mediterranean) Abstract ­ The objective of our study was to characterise cropping systems in apple arboriculture in the less sensitive areas. apple orchard / on-farm survey / cultivation operation / management indicator

Paris-Sud XI, Université de

289

PMC· FF2a U.S. DEPARThiENT OF ENERGY EERE PROJECT MANAG EM  

Broader source: Energy.gov (indexed) [DOE]

FF2a U.S. DEPARThiENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DETERJ\fiNATION Page 1 of2 RECIPIENT:South Carolina Energy Office (SCEO) STATE: SC PROJECf TITLE: State Energy Program- 2012 Formula Grant Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000643 EE0003884 GF0-0003884-001 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audits), data analysis (including, but not limited to, computer modeling}, document preparation

290

u.s. DEPARThIENT OF ENFRGY EERE PROJECT MANAG EM ENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

ENFRGY ENFRGY EERE PROJECT MANAG EM ENT CENTER NFPA DETERl\lINATION Page 1 of3 RECIPIENT:City of Lincoln. NE STATE: NE PROJECT TITLE; DE EE0000664 City of Lincoln NE EECBG Project #18 Energy Demonstration Project Funding Opportunity Announcement Number Procurement Instrumcnt Number NEPA Control Number CID Number DE-FOA-OOOOO13 OE·EEOOOO664.003 0 Based on my review of the inronnation (oncuning the proposed ac:tion, as NEPA Compliance Officer (authoriud uDder DOE Order 451.IA), I have made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

291

U.S DEPARTlIfENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

.u .u ., :. U.S DEPARTlIfENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DETI!RMINATION RECIPIENT :Slale of Utah PROJECT TITLE: Large Scale Solar - Roof Mounted - Red Rock canyon School Page 1 of2 STAn::: UT Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number DE-FOA-OOOOO52 EEOOOOO83 GF0-0000083-015 EE83 Based on my review of the information concerning the proposed action, as NEPA Compliance Offictr (authori7.ed under DOE Orner 451.1A), I have made the following deter-minatlon: ex, EA, [IS APPENDIX AND NUMBER: Description: 8 5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficlency that do not Increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

292

DEPARTIIIENT OF ENERGY EE RE PROJECT MANAG EM ENT CENT ER NEPA DETElThIINAIION  

Broader source: Energy.gov (indexed) [DOE]

Irmo Irmo u.s. DEPARTIIIENT OF ENERGY EE RE PROJECT MANAG EM ENT CENT ER NEPA DETElThIINAIION PROJECT TITl.E: Irma Charing Cross Sidewalk Project ARRA-EECBG Page 1 of2 fJ Wl G) STATE: SC Funding Opportunity Announcement Number PrOCUT£ment Instrument Number NEPA Control Number CID Number EEOOO0950/000 DE-EEOOOO950 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1 A), I have made the following determination: ex, EA, EIS APPENDlX AND NUMBER: Description: 85.1 Actions to conselVe energy, demonstrate potential energy conservation , and promote energy.efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

293

u.s. DEPARUIENT OF ENERGY EE RE PROJECT MANAG EM ENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

p .* p .* *. O!, u.s. DEPARUIENT OF ENERGY EE RE PROJECT MANAG EM ENT CENTER NEPA DETERl\IINATION RECIPIENT:Pyramid Lake Paiute Tribe PROJECT TITLE: Recovery Act: Geothermal Technologies Program STATE: NV Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Numbu CID Number DE~FOA-OOOO-109 DE-EEOOO2842 GF0-10-336 G02642 Based on my review orcbe information concerning the proposed adion, as NEPA Compliance omcer (auCboriud under DOE Order 4SI.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to. literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

294

u.s. DEP.-\RTUENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

RTUENT OF ENERGY RTUENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DETERlIlINATION RECIPI ENT:RI Office of Energy Resources PROJECT TITLE: State of Rhode Island - EECBG Page 1 of2 STATE: R I Funding Opportunity Announcement Number Procurement Instrument Numbu NEPA Control Numbu CID Number DE-FOA-OOOOO13 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency thai do not increase the indoor concentrations of polentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

295

u.s. DEPARn-IENT OF ENERGY EERE PROJECT MANAG EM EN T CEN T  

Broader source: Energy.gov (indexed) [DOE]

DEPARn-IENT OF ENERGY DEPARn-IENT OF ENERGY EERE PROJECT MANAG EM EN T CEN T ER NEPA DETERl\IINATION RECIPIENT:TEXAS COMPTROLLER OF PUBLIC ACCOUNTS PROJECT TITLE: ARRA SEP UNIVERSITY OF NORTH TEXAS - DENTON Page 1 of2 STATE; TX Funding Opportunity AUDouDCl'ment Numbt'r Procurement Instrument Number NEPA Control Number CID Number DE-EEOOOO116 EEOOOO116 EE116 Based on my nvil'w orlhl' information ('onenning thl' proposed adioD, as NEPA Compliance Officer (authorizt'd under DOE Order451.lA). I have made the following determination: ex, EA, [IS APPENDIX AND NUMBER: Description: A9 Information gathering (includ ing, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (suCh as conceptual design or feasibility studies, analytical energy supply

296

The Bachelor of Management degree in Management Information Systems is a minimum of 40 courses in length. Admission to the Faculty may occur at the end of Year One. Students are required to have the following courses for  

E-Print Network [OSTI]

The Bachelor of Management degree in Management Information Systems is a minimum of 40 courses-language university. BachelorofManagement ManagementInformationSystems Name Technology Management 4090 - Management Policy and Strategy Management 4840 - Systems Analysis Management

Seldin, Jonathan P.

297

Intranet based system for a product innovation management process  

Science Journals Connector (OSTI)

A high quality product development process is a critical success factor for product innovations. Many companies have developed process models to support the management of product innovation processes. The defined management process models are not always flexible enough and sufficiently easy to use to ensure their regular usage in companies. This study utilises the possibilities of internet technologies to build a system to promote product innovation management (PIM), to support the use of management process models and to meet the defined development requirements for PIM. Our paper describes the developed system and clarifies its possibilities, advantages and limitations. The system includes different process models, it assists in the selection of an appropriate process model, and provides instructions for the implementation of the different stages in the PIM process. The developed system provides companies with a framework for building their own management systems.

Petteri Piippo; Jouni Koivuniemi; Hannu Karkkainen; Markku Tuominen; Takaya Ichimura

2003-01-01T23:59:59.000Z

298

An intelligent biological information management system  

Science Journals Connector (OSTI)

......Mishra 3 1Computer Science Department...and Information Science, Indiana University...for information management from data retrieval...filtering (IF) approach as a possible...and Information Science, University...1985) A New Approach to the Design...of information management, i.e. mapping......

Mathew Palakal; Snehasis Mukhopadhyay; Javed Mostafa; Rajeev Raje; Mathias N'Cho; Santosh Mishra

2002-10-01T23:59:59.000Z

299

Carnegie Mellon University 70-451 Management Information Systems: Spring 2012Carnegie Mellon University 70-451 Management Information Systems: Spring 2012 1Carnegie Mellon University 70-451 Management Information Systems: Spring 2012 1Carnegie Mellon Univ  

E-Print Network [OSTI]

Carnegie Mellon University 70-451 Management Information Systems: Spring 2012Carnegie Mellon University 70-451 Management Information Systems: Spring 2012 1Carnegie Mellon University 70-451 Management Information Systems: Spring 2012 1Carnegie Mellon University 70-451 Management Information Systems: Spring

Gatterbauer, Wolfgang

300

INFORMATION ON THE SYSTEM FOR AWARD MANAGEMENT (SAM)  

Broader source: Energy.gov (indexed) [DOE]

ON THE SYSTEM FOR AWARD MANAGEMENT (SAM) ON THE SYSTEM FOR AWARD MANAGEMENT (SAM) Eight federal procurement systems and the Catalog of Federal Domestic Assistance will be combined into one new system, the System for Award Management (SAM). The overarching benefits of SAM include streamlined and integrated processes, elimination of data redundancies, and reduced costs while providing improved capability. Capability of the individual systems is expected to be available to users via SAM in stages, starting with Entity Management (Central Contractor Registration (CCR), Federal Agency Regulation (FedReg), Online Representatives and Certification Application (ORCA) and the Excluded Parties List System (EPLS)) beginning May 29, 2012. After implementation of SAM, when users go to the CCR/FedReg, ORCA, or EPLS websites, they'll be

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Management processes in U.S. air traffic management modernization : a study of global navigation satellite system development  

E-Print Network [OSTI]

This thesis investigates organization and management issues associated with the Federal Aviation Administration's (FAA) efforts to modernize the nation's Air Traffic Management (ATM) system. Focus is placed specifically ...

Sandvig, John H.

1994-01-01T23:59:59.000Z

302

Non-ferrous Metals Industry Energy Management System Certification  

Broader source: Energy.gov (indexed) [DOE]

ferrous Metals Industry ferrous Metals Industry Energy Management System Certification China Quality Certification Center Zhigang Wang 1. Importance Energy Management System 2. Pilot Programs of Energy Management System Certification Contents China Quality Certification Center A professional certification body under the General Administration of Quality Supervision, Inspection and Quarantine of the PRC. Member of the following international organizations: IECEE and IQNet. CQC provides the following services; System certification, Product certification and Training . Main Qualifications -State authorized administrator of the Energy Conservation Label -Provides compulsory product certification as outlined by the Certification and Accreditation Administration(CNCA) of the PRC

303

Integrated Safety & Environmental Management System | Stanford Synchrotron  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Integrated Safety & Environmental Management System Integrated Safety & Environmental Management System How do you plan for SAFETY in your job? In an effort to provide a formal and organized process to manage all aspects of Environment, Safety and Health (ES&H) issues at its laboratories, the DOE developed the Integrated Safety and Environmental Management System (ISEMS). In short, it's a process that allows people (such as staff and Users) at all levels to plan, perform, assess and improve their implementation of ES&H at work. The system puts the responsibility for safety on each person. Fundamental to the process are the Guiding Principles that can be viewed as "best management practices" or "how we do business", which are the policies that integrate ISMS at all levels; the Core Functions, which provide the

304

Integrated Brush Management Systems for Texas  

E-Print Network [OSTI]

of disciplines, including range management, wildlife biology, animal science and economics. Other disciplines such as recre- ation and tourism sciences also may be needed to address the potential for ecotourism or other range-related activities. In 1981, a group...

Hanselka, C. Wayne; Hamilton, Wayne T.; Rector, Barron S.

2001-01-04T23:59:59.000Z

305

Best Management Practice: Distribution System Audits, Leak Detection, and  

Broader source: Energy.gov (indexed) [DOE]

Best Management Practice: Distribution System Audits, Leak Best Management Practice: Distribution System Audits, Leak Detection, and Repair Best Management Practice: Distribution System Audits, Leak Detection, and Repair October 7, 2013 - 3:06pm Addthis A distribution system audit, leak detection, and repair programs help Federal facilities reduce water losses and make better use of limited water resources. Overview Federal facilities with large campus settings and expansive distribution systems can lose a significant amount of total water production and purchases to system leaks. Leaks in distribution systems are caused by a number of factors, including pipe corrosion, high system pressure, construction disturbances, frost damage, damaged joints, and ground shifting and settling. Regular distribution system leak detection surveys

306

Using the expert systems in the operational management of production  

Science Journals Connector (OSTI)

In the conditions of computing the human society, the operational management activities can be improved by using artificial intelligence. The expert system is an intelligent system based on the symbolic representation of knowing, implemented on 2 hardware ... Keywords: artificial intelligence, expert systems, implementing the expert system, interface, search engine

Ioan Constantin Dima; Janos. Gabrara; Vladimir Modrak; Pachura Piotr; Constanta Popescu

2010-06-01T23:59:59.000Z

307

Energy Management Systems Package for Small Commercial Buildings  

Broader source: Energy.gov (indexed) [DOE]

EnMS (energy management EnMS (energy management systems) Package for Small Commercial Buildings Jessica Granderson Lawrence Berkeley National Laboratory JGranderson@lbl.gov 510.486.6792 April 4, 2013 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: Small commercial buildings present two challenges for implementing energy efficiency strategies 1) high transaction cost relative to total savings 2) lack of personnel time or skill available for energy management

308

Systems and Components Development Expertise [Nuclear Waste Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Systems and Components Systems and Components Development Expertise Nuclear Fuel Cycle and Waste Management Technologies Overview Modeling and analysis Unit Process Modeling Mass Tracking System Software Waste Form Performance Modeling Safety Analysis, Hazard and Risk Evaluations Development, Design, Operation Overview Systems and Components Development Expertise System Engineering Design Other Major Programs Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE Division on Flickr Nuclear Waste Management using Electrometallurgical Technology Systems and Components Development Expertise Bookmark and Share Electrorefiner The electrorefiner: an apparatus used for electrometallurgical treatment of spent nuclear fuel to facilitate storage and ultimate disposal. Click on

309

SERVICE ORIENTED ARCHITECTURES FOR BUSINESS PROCESS MANAGEMENT SYSTEMS  

E-Print Network [OSTI]

SERVICE ORIENTED ARCHITECTURES FOR BUSINESS PROCESS MANAGEMENT SYSTEMS ABSTRACT The integration of research in the area of Service Oriented Architectures (SOA) with current methodologies and tools of on-going research in the application of Service Oriented Architectures in Business Process Management

Marchese, Maurizio

310

Leadership in Health Care Systems: Health Care Organization Management  

E-Print Network [OSTI]

Leadership in Health Care Systems: Health Care Organization Management and Leadership Track: ­ Health Care Organization, Management and Leadership ­ Clinical Research Coordinator ­ Clinical Nurse in health care ethics ­ Public mission ­ Fiscal stewardship ­ Inclusiveness and diversity ­ Theory based

Goldman, Steven A.

311

A Smart Energy System: Distributed Resource Management, Control and Optimization  

E-Print Network [OSTI]

A Smart Energy System: Distributed Resource Management, Control and Optimization Yong Ding, Student of distributed energy resource and consumption management, which proposes to design a networked and embedded platform for realizing a dynamic energy mix and optimizing the energy consumption dy- namically. Based

Beigl, Michael

312

EM-PDRI Team Concurrence  

Office of Environmental Management (EM)

Management's Project Definition Rating Index (EM*PDRI) The Environmental Management (EM) PDRI Team concurs that Revision 1, January, 2001, reflects the requirements in DOE Order...

313

FLEXIBILITY IN WATER RESOURCES MANAGEMENT: REVIEW OF CONCEPTS AND DEVELOPMENT OF ASSESSMENT MEASURES FOR FLOOD MANAGEMENT SYSTEMS1  

E-Print Network [OSTI]

FLEXIBILITY IN WATER RESOURCES MANAGEMENT: REVIEW OF CONCEPTS AND DEVELOPMENT OF ASSESSMENT around adapting water management systems to climate change often express the need to increase system it means to have a flexible water management system, what features of a system make it more flexible than

Tullos, Desiree

314

Appropriate Technologies and Systems to respond to Climate Change, Improved Water Resources Management, Waste Management and Sanitation  

E-Print Network [OSTI]

Resources Management, Waste Management and Sanitation A Review of Water Information Systems in the English to adequately manage the resource and institute measures to equitably allocate water among the various competing in the management of the resource. This paper examines the water information systems of St. Lucia, Jamaica

Barthelat, Francois

315

Proposed platform for improving grid security by trust management system  

E-Print Network [OSTI]

With increasing the applications of grid system, the risk in security field is enhancing too. Recently Trust management system has been recognized as a noticeable approach in enhancing of security in grid systems. In this article due to improve the grid security a new trust management system with two levels is proposed. The benefits of this platform are adding new domain in grid system, selecting one service provider which has closest adaption with user requests and using from domains security attribute as an important factor in computing the trust value.

Siadat, Safieh; Mohsenzadeh, Mehran

2009-01-01T23:59:59.000Z

316

Systems Engineering Introduction to Software Quality Management  

E-Print Network [OSTI]

for quality management ISO 9001:2000 is a generic model of the quality process; ISO 9001:2008 clarifies ISO 9001:2000 ISO 9001:2008 applicable to any organisation that designs, develops and maintains products (or services) ISO 9000-3 interprets 9001 for software dev. 12 Features of ISO 9001:2008 Organisational

Bryson, Joanna J.

317

Appliance-Aware Activity Recognition Mechanism for IoT Energy Management System  

Science Journals Connector (OSTI)

......implementation of smart home energy management systems based...K.-D. (2010) Home Energy Management System Based...2011) A Novel Home Energy Management System Architecture...1921, pp. 8083. ACM New York, NY, USA. [14] Tapia......

Wei-Ting Cho; Ying-Xun Lai; Chin-Feng Lai; Yueh-Min Huang

2013-08-01T23:59:59.000Z

318

Earned Value Management System (EVMS) Surveillance Standard Operating Procedure  

Broader source: Energy.gov (indexed) [DOE]

System (EVMS) System (EVMS) Surveillance Standard Operating Procedure (ESSOP) Issued by Office of Acquisition and Project Management MA-63 September 30, 2013 V2 DEPARTMENT OF ENERGY Office of Acquisition and Project Management (OAPM) EVMS SURVEILLANCE SOP (ESSOP) SEPTEMBER 30, 2013 ii Earned Value Management System (EVMS) Surveillance Standard Operating Procedure (ESSOP) OPR: MA-63 Update V2: September 30, 2013 1. PURPOSE. This EVMS Surveillance Standard Operating Procedure (ESSOP) serves as a primary reference for OAPM MA-63 when conducting EVM System-level assessments. DOE Order (O) 413.3B, the Office of Management and Budget (OMB) Circular A-11, and the Federal Acquisition Regulations (FAR) require implementation of an EVMS on DOE capital asset

319

Exergy Analysis of Data Center Thermal Management Systems  

Science Journals Connector (OSTI)

Data center thermal management systems exist to maintain the computer equipment within acceptable operating temperatures. As power densities have increased in data centers, however, the energy used by the cooling...

Amip J. Shah; Van P. Carey; Cullen E. Bash…

2012-01-01T23:59:59.000Z

320

Grid-Based Resource Management of Naval Weapon Systems  

Science Journals Connector (OSTI)

The continuous transformation of the Chinese navy into an integrated and network-centric capability requires a cooperative and distributed weapon resource management system. As one of the ... Service Architecture...

Bin Zeng; Tao Hu; ZiTang Li

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Portfolio Analysis and Management System (PAMS) External User Guide  

Office of Energy Efficiency and Renewable Energy (EERE)

Portfolio Analysis and Management System (PAMS) External User Guide, Version 11.0, September 2013. Prepared for: U.S. Department of Energy Office of Science Office of Business Policy and Operations.

322

Quality Management System Guidelines- Building America Top Innovation  

Broader source: Energy.gov [DOE]

Quality management system tools were customized for residential construction by BSC, IBACOS, and PHI, for use by builders, trades, and designers to help eliminate mistakes that would require high-cost rework.

323

SIS - TMS: A Thesaurus Management System for Distributed Digital Collections  

Science Journals Connector (OSTI)

The availability of central reference information as thesauri is critical for correct intellectual access to ... There is a continuous raise in interest in thesauri, and several thesaurus management systems have ...

Martin Doerr; Irini Fundulaki

1998-01-01T23:59:59.000Z

324

ISO 50001: A Global Energy Management System Standard  

E-Print Network [OSTI]

ISO 50001:2011 provides benefits for any organization to establish a framework to manage and improve energy consumption. The framework of ISO 50001:2011 enables organizations to establish the systems and processes necessary to improve energy...

Chowdhury, N.

2013-01-01T23:59:59.000Z

325

Managing Threats to Web Databases and Cyber Systems  

Science Journals Connector (OSTI)

This chapter provides an overview of some of the cyber threats information systems as well as data management ... then discusses potential solutions and challenges. The threats include access control violations, ...

Bhavani Thuraisingham

2005-01-01T23:59:59.000Z

326

Security Requirements Model for Grid Data Management Systems  

Science Journals Connector (OSTI)

In this paper, we present our ongoing work of a policy-driven approach to security requirements of grid data management systems (GDMS). We analyse the security functionalities of existing GDMS to determine their ...

Syed Naqvi; Philippe Massonet; Alvaro Arenas

2006-01-01T23:59:59.000Z

327

Probabilistic Risk Assessment for dairy waste management systems  

E-Print Network [OSTI]

Probabilistic Risk Assessment (PRA) techniques were used to evaluate the risk of contamination of surface and ground water with wastewater from an open lot dairy in Erath County, Texas. The dairy supported a complex waste management system...

Leigh, Edward Marshall

2012-06-07T23:59:59.000Z

328

Linear Road : benchmarking stream-based data management systems  

E-Print Network [OSTI]

This thesis describes the design, implementation, and execution of the Linear Road benchmark for stream-based data management systems. The motivation for benchmarking and the selection of the benchmark application are ...

Tibbetts, Richard S. (Richard Singleton), 1979-

2003-01-01T23:59:59.000Z

329

Asset Management System (AMS) for Property Custodians Quick Reference Guide Page 1 of 31  

E-Print Network [OSTI]

Asset Management System (AMS) for Property Custodians ­ Quick Reference Guide Page 1 of 31 Accessing the Asset Management System (AMS) 1) Sign into MyLSU #12;Asset Management System (AMS Management" 3) When you see the SSO Welcome screen (above), click "OK". #12;Asset Management System (AMS

Stephens, Jacqueline

330

Configuration management program plan for Hanford site systems engineering  

SciTech Connect (OSTI)

This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

Hoffman, A.G.

1994-11-14T23:59:59.000Z

331

Security plan for the Automated Transportation Management System  

SciTech Connect (OSTI)

The Automated Transportation Management System (ATMS) is an unclassified non-sensitive system consisting of hardware and software designed to facilitate the shipment of goods for the US Department of Energy (DOE). The system is secured against waste, fraud, abuse, misuse, and programming errors through a series of security measures that are discussed in detail in this document.

Not Available

1994-04-01T23:59:59.000Z

332

Seminar 10! Project Management & System Design!  

E-Print Network [OSTI]

(e.g., sample return)" �# Power and Propulsion" �#Solar cells" �# Kick motor/ payload assist module of the Development of Space Systems" !# Organization" #12;Systems Engineering" Pisacane, V., Fundamentals of Space System Design, Ch. 1! Product Development" Pisacane, V., Fundamentals of Space System Design, Ch. 1! #12

Stengel, Robert F.

333

EM Quality Assurance Program (EM-QA-001 Revision 0)  

Broader source: Energy.gov (indexed) [DOE]

I I ~ r h b 1tv2om m ~ e e of Environments1M a ~ f p ~ ~ ! n n t (EM) Snbjeet: E M Quality Asamnee Program (QBP) Policies, Procedures, APPROVED: and Plans Principal Deputy Secretary for Environmental Management 1.0 PURPOSE AND OBJECTIVE The purpose of this document is to describe the U.S. Department of Energy (DOE), Office of Environmental Management (EM) Quality Assurance Program (QAP). The QAP is the EM management system to ensure we "do work correctly." The QAP meets the requirements of DOE 0 414. IC, Quality Assurance, and 10 CFR 830 Subpart A "Quality Assurance Requirements." It is intended that the requirements of DOE 0 414.1C and 10 CFR 830 Subpart A are met by implementing this QAP. The QAP provides EM expectations for implementing quality assurance (QA) across the EM complex. The QAP

334

Monitoring Buildings with Energy Management and Control Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Monitoring Buildings with Energy Management and Control Systems Monitoring and evaluation are important parts of all energy-efficiency programs. With the increasing regulatory requirements for verification of demand-side management program savings and continued development of more innovative financing mechanisms, the ability to substantiate claims of energy savings using measured data takes on added importance. Although expensive, the accurate monitoring of energy consumption and building operations is a necessary part of conservation savings analysis. Energy management and control systems (EMCSs), intended for building operations and control functions, already contain most of the same equipment usually installed for energy monitoring and can often be used for

335

Federal Emergency Management Information System (FEMIS) Data Management Guide Version 1.3  

SciTech Connect (OSTI)

FEMIS is an emergency management planning and analysis tool that is being developed under the direction of the US Army Chemical and Biological Defense Command. FEMIS is designed to help civilian emergency management personnel to plan for and support their responses to a chemical-releasing event at a military chemical stockpile. This guide provides the background as well as the operations and procedures needed to generate and maintain the data resources in the system. Database administrators, system administrators, and general users can use this guide to manage the datafiles and database. This document provides a description of the relational and spatial information present in FEMIS. It describes how the data was assembled, loaded, and managed while the system is in operation.

Burnett, R.A.; Downing, T.R.; Gaustad, K.L.; Hoza, M.; Johnson, S.M.; Loveall, R.M.; Millard, W.D.; Winters, C.; Wood, B.M.

1996-12-01T23:59:59.000Z

336

CEQ NEPA & EMS Guide  

Broader source: Energy.gov (indexed) [DOE]

National Environmental Policy Act Processes with Environmental Management Systems c o u n c i l o n e n v i r o n m e n t a l q u a l i t y A Guide for NEPA and EMS Practitioners a p r i l 2 0 0 7 Preface This guide builds on research and consultations undertaken by the Council on Environmental Quality (CEQ) on the complementary aspects of the National Environmental Policy Act (NEPA) and Environmental Management Systems (EMS). It introduces issues and provides information on how NEPA and EMS can be aligned. This guide does not establish new requirements, does not constitute formal CEQ guidance, and its recommendations should not be considered legally binding. A Guide for NEPA and EMS Practitioners  Aligning National Environmental Policy Act Processes with Environmental Management Systems

337

ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) |  

Broader source: Energy.gov (indexed) [DOE]

SCADA/EMS System INEEL Baseline Summary Test Report (November SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) This document covers the security evaluation of the "baseline" or "as delivered" system performed in the Idaho National Engineering and Environmental Laboratory (INEEL) SCADA test bed as part of the Critical Infrastructure Test Range Development Program, which is funded by the U.S. Department of Energy; Office of Energy Assurance (DOE/OEA). This report is a nonproprietary version of the report sent to ABB that identified specific issues related to the security vulnerabilities in the ABB SCADA/EMS system. Work was performed by specialists in the fields of control system development, networking, software engineering, and cybersecurity. This

338

Contact EM  

Broader source: Energy.gov [DOE]

For information about the Office of Environmental Management and its programs; for assistance in information on this website; or for general information purposes:  By E-Mail: EM.WebContentManager...

339

Advanced Management of Compressed Air Systems  

Broader source: Energy.gov [DOE]

Find out how a compressed air system works and the benefits of optimal compressed air system performance. This training is designed to help end users as well as industry solution providers learn...

340

Best Management Practice: Boiler/Steam Systems | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Best Management Practice: Boiler/Steam Systems Best Management Practice: Boiler/Steam Systems Best Management Practice: Boiler/Steam Systems October 7, 2013 - 3:17pm Addthis Boilers and steam generators are commonly used in large heating systems, institutional kitchens, or in facilities where large amounts of process steam are used. This equipment consumes varying amounts of water depending on system size, the amount of steam used, and the amount of condensate returned. Operation and Maintenance Options To maintain water efficiency in operations and maintenance, Federal agencies should: Develop and implement a routine inspection and maintenance program to check steam traps and steam lines for leaks. Repair leaks and replace faulty steam traps as soon as possible. Develop and implement a boiler tuning program to be completed a minimum of

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Methodology for assessing performance of waste management systems  

SciTech Connect (OSTI)

The purpose of the methodology provided in this report is to select the optimal way to manage particular sets of waste streams from generation to disposal in a safe and cost-effective manner. The methodology described is designed to review the entire waste management system, assess its performance, ensure that the performance objectives are met, compare different LLW management alternatives, and select the optimal alternative. The methodology is based on decision analysis approach, in which costs and risk are considered for various LLW management alternatives, a comparison of costs, risks, and benefits is made, and an optimal system is selected which minimizes costs and risks and maximizes benefits. A ''zoom-lens'' approach is suggested, i.e., one begins by looking at gross features and gradually proceeds to more and more detail. Performance assessment requires certain information about the characteristics of the waste streams and about the various components of the waste management system. Waste acceptance criteria must be known for each component of the waste management system. Performance assessment for each component requires data about properties of the waste streams and operational and design characteristics of the processing or disposal components. 34 refs., 2 figs., 1 tab.

Meshkov, N.K.; Herzenberg, C.L.; Camasta, S.F.

1988-01-01T23:59:59.000Z

342

Definition: Customer Energy Management Device and System | Open Energy  

Open Energy Info (EERE)

Device and System Device and System Jump to: navigation, search Dictionary.png Customer Energy Management Device and System A device that can control other energy devices such as thermostats, lighting, direct load control devices, or distributed energy resource within the customer premise. These devices may also receive information or control signals from utillities or third party energy service providers. These devices can help customers manage electricity usage automatically by utilizing information from service providers, or preferences set by the customer.[1] Related Terms energy, electricity generation, distributed energy resource References ↑ https://www.smartgrid.gov/category/technology/customer_energy_management_device_and_system [[Cat LikeLike UnlikeLike You like this.Sign Up to see what your friends like.

343

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

285: Transmission System Vegetation Management Program 285: Transmission System Vegetation Management Program EIS-0285: Transmission System Vegetation Management Program SUMMARY Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure I-1). The seven states offer a great diversity of vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and neighboring members of the public, and interfere with our ability to maintain these facilities. We need to keep vegetation a safe distance away from our electric power facilities and control noxious weeds at our

344

Next-Generation Distributed Power Management for Photovoltaic Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Next-Generation Distributed Power Management for Photovoltaic Systems Next-Generation Distributed Power Management for Photovoltaic Systems Speaker(s): Jason Stauth Date: July 29, 2011 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Steven Lanzisera In recent years, the balance of systems (BOS) side of photovoltaic (PV) energy has become a major focus in the effort to drive solar energy towards grid parity. The power management architecture has expanded to include a range of distributed solutions, including microinverters and 'micro' DC-DC converters to solve problems with mismatch (shading), expand networking and control, and solve critical BOS issues such as fire safety. This talk will introduce traditional and distributed approaches for PV systems, and will propose a next-generation architecture based on a new

345

Nova Publishers Smart Grid: Technologies, Applications and Management Systems  

E-Print Network [OSTI]

Nova Publishers Smart Grid: Technologies, Applications and Management Systems Accurate Component residential photovoltaic (PV) power generation and energy storage systems into the Smart Grid is an effective for peak shaving on their power demand profile from the Smart Grid, and thereby, minimize their electricity

Pedram, Massoud

346

Mobile Model-Based Bridge Lifecycle Management Systems  

E-Print Network [OSTI]

Mobile Model-Based Bridge Lifecycle Management Systems Amin Hammad* Concordia Institute for Information Systems Engineering 1425 René Lévesque Boulevard, Montréal, Québec, H3G 1T7, Canada Cheng Zhang University Abstract: This paper discusses the requirements for developing Mobile Model-based Bridge Lifecycle

Hammad, Amin

347

System Management Ontology Description Logic Formalization of CIM  

E-Print Network [OSTI]

SMO System Management Ontology Description Logic Formalization of CIM Andrea Cal`i, Diego Calvanese Information Model (CIM) has the goal of providing a suitable approach for modeling systems and networks using the object-oriented paradigm. In this document we illustrate how to map CIM onto an expressive Description

Calvanese, Diego

348

Sediment management in sustainable urban drainage system ponds  

E-Print Network [OSTI]

Sediment management in sustainable urban drainage system ponds K.V. Heal*, D.A. Hepburn** and R.lunn@strath.ac.uk) Abstract Since removal and disposal of sustainable urban drainage system (SUDS) sediment can incur high maintenance costs, assessments of sediment volumes, quality and frequency of removal are required. Sediment

Heal, Kate

349

Web Service Access Management for Integration with Agent Systems  

E-Print Network [OSTI]

Web Service Access Management for Integration with Agent Systems B.J. Overeinder, P.D. Verkaik, from the perspective of agent systems (and not as is gen- erally the case by web service providers). Mediating between web service requests from (virtual) organizations of agents, the web ser- vice gateway

350

Mass Tracking System Software [Nuclear Waste Management using  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mass Tracking System Mass Tracking System Software Nuclear Fuel Cycle and Waste Management Technologies Overview Modeling and analysis Unit Process Modeling Mass Tracking System Software Waste Form Performance Modeling Safety Analysis, Hazard and Risk Evaluations Development, Design, Operation Overview Systems and Components Development Expertise System Engineering Design Other Major Programs Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE Division on Flickr Nuclear Waste Management using Electrometallurgical Technology Mass Tracking System Software Bookmark and Share The NE Division has developed a computer-based Mass Tracking (MTG) system, which is used at the Idaho National Laboratory Fuel Conditioning Facility (FCF) to maintain a real-time accounting of the inventory of containers and

351

Running Head: WHAT ARE LEARNING MANAGEMENT SYSTEMS 1 An Argument for Clarity: What are Learning Management Systems, What are They Not,  

E-Print Network [OSTI]

Running Head: WHAT ARE LEARNING MANAGEMENT SYSTEMS 1 An Argument for Clarity: What are Learning Management Systems, What are They Not, and What Should They Become? William R. Watson Indiana University. Indianapolis, IN 46234 Keywords: Course Management Systems, E-learning, Integrated Learning System, Learning

Paris-Sud XI, Université de

352

Graduate School of Creative Science and Engineering Department of Industrial and Management Systems Engineering  

E-Print Network [OSTI]

Graduate School of Creative Science and Engineering Department of Industrial and Management and Engineering Department of Industrial and Management Systems Engineering Research Instruction Application; Graduate School of Creative Science and Engineering Department of Industrial and Management Systems

Kaji, Hajime

353

A Data and Knowledge Management System for Intelligent Buildings  

E-Print Network [OSTI]

words: Intelligent building; Assessment; Methodology; Information system 1. INTRODUCTION It is the development and application of modern technologies in the areas of information, communication, materials, and machinery in the construction... Future, Vol.VIII-6-3 management of IBs. It is the authors? initiative to put forward an integrated methodology for lifecycle information management and knowledge utilization of IBs. The methodology will be described by using a novel prototype based...

Hong, J.; Chen, Z.; Li, H.; Xu, Q.

2006-01-01T23:59:59.000Z

354

Microsoft Word - EM_CM_3_Risk_Management_Best Practices and Gaps.doc  

Broader source: Energy.gov (indexed) [DOE]

CONTRACT AND PROJECT MANAGEMENT CONTRACT AND PROJECT MANAGEMENT ROOT CAUSE ANALYSIS CORRECTIVE ACTION PLAN CORRECTIVE MEASURE 3 IDENTIFICATION OF BEST RISK MANAGEMENT PRACTICES AND ANALYSIS OF DOE RISK MANAGEMENT PLANS SUMMARY REPORT JULY 2009 ii iii Contents 1.0 Introduction......................................................................................................................... 1 2.0 Discussion of Approach...................................................................................................... 2 3.0 Summary of Gaps and Planned Next Steps ........................................................................ 7 Attachment 1- List of Risk Management Plans Reviewed ........................................................ 12 Attachment 2-Risk Management Best Practices

355

Introducing Energy Management Systems into Smaller Facilities  

E-Print Network [OSTI]

Many small and medium sized commercial buildings are energy hogs. Typically they were designed and built to meet low first cost criteria. Control system capability is usually minimal, insulation is thin, glass areas are large, and HVAC equipment...

Lawrence, J. A.

1983-01-01T23:59:59.000Z

356

ExxonMobil Global Energy Management System  

E-Print Network [OSTI]

of our refineries and chemical plants. The system builds on international best practices and benchmarking to identify energy efficiencies. Launched in 2000, it utilizes a common methodology to identify performance gaps, implement closure plans, sustain...

Roberto, F.

357

EM Tank Waste Subcommittee Report for SRS and Hanford Tank Waste Review  

Broader source: Energy.gov (indexed) [DOE]

One System Plan. ........................................................................................................ 88 v PREFACE This is the second report of the Environmental Management Tank Waste Subcommittee (EM- TWS) of the Environmental Management Advisory Board (EMAB). The first report was submitted and accepted by the Assistant Secretary for Environmental Management (EM-1) in September 2010. The EM-TWS responded to three charges from EM-1 regarding the Waste Treatment and Immobilization Plant at Hanford (WTP) under construction in Richland, Washington. EM's responses were timely, and efforts have been put in place to address the recommendations that EMAB made. This report addresses eight charges given to the EM-TWS earlier this fiscal year. The current

358

Managing variability in the IO performance of petascale storage systems.  

SciTech Connect (OSTI)

Significant challenges exist for achieving peak or even consistent levels of performance when using IO systems at scale. They stem from sharing IO system resources across the processes of single large-scale applications and/or multiple simultaneous programs causing internal and external interference, which in turn, causes substantial reductions in IO performance. This paper presents interference effects measurements for two different file systems at multiple supercomputing sites. These measurements motivate developing a 'managed' IO approach using adaptive algorithms varying the IO system workload based on current levels and use areas. An implementation of these methods deployed for the shared, general scratch storage system on Oak Ridge National Laboratory machines achieves higher overall performance and less variability in both a typical usage environment and with artificially introduced levels of 'noise'. The latter serving to clearly delineate and illustrate potential problems arising from shared system usage and the advantages derived from actively managing it.

Wolf, Matthew; Zheng, Fang; Klasky, Scott; Schwan, Karsten; Oldfield, Ron A.; Lofstead, Gerald Fredrick, II; Liu, Qing; Kordenbrock, Todd

2010-11-01T23:59:59.000Z

359

Stochastic Modeling of a Power-Managed System: Construction and Optimization  

E-Print Network [OSTI]

1 Stochastic Modeling of a Power-Managed System: Construction and Optimization Qinru Qiu, Qing Wu of a power-managed electronic system. We formulate the problem of system-level power management-digital components. Dynamic power management ­ which refers to a selective shut-off or slow-down of system components

Pedram, Massoud

360

A Context Driven Information Retrieval for Online Urban Disaster Management System  

E-Print Network [OSTI]

A Context Driven Information Retrieval for Online Urban Disaster Management System Khaldoun ZREIK of Disaster Managing Approaches depends firmly on information and communication management system. Due to the interactive decision board, an optimised Data Base Management System, a light Geographical Information System

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Novel Battery Thermal Management System for Greater Lifetime Ratifying Current Quality and Safety Standard  

E-Print Network [OSTI]

Novel Battery Thermal Management System for Greater Lifetime Ratifying Current Quality and Safety thermal management system (BTMS) is an important and integral part of battery management system (BMS battery pack ecosystem. Fig. 1 corresponds a generic battery thermal management system operating

Andreasen, Søren Juhl

362

Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.2  

SciTech Connect (OSTI)

The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Chemical biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS system package. System administrators, database administrators, and general users can use this guide to install, configure, and maintain the FEMIS client software package. This document provides a description of the FEMIS environment; distribution media; data, communications, and electronic mail servers; user workstations; and system management.

Burford, M.J.; Burnett, R.A.; Curtis, L.M. [and others

1996-05-01T23:59:59.000Z

363

Meeting Minutes from Automated Home Energy Management System Expert Meeting  

Broader source: Energy.gov (indexed) [DOE]

Home Energy Management System Expert Meeting Home Energy Management System Expert Meeting October 1-2, 2009 AGENDA - Day 1 8:30 - 8:45 Welcome and Debriefing of Building America and Home Energy Management Research- Lew Pratsch, DOE 8:45 - 9:15 Utilities Trends- Smart Grid Projects and Integration With Home Controls - Mike Keesee, SMUD 9:15 - 9:45 Thoughts on Controls System Performance Requirements - Rich Brown, LBL 9:45 - 10:15 Efficiency Trends in Consumer Electronics - Kurtis McKenney, TIAX 10:15 - 10:30 Session Break 10:30 - 11:00 Cloud Computing (Web Data Computing, Data Storage) Trends - Troy Batterberry, Microsoft 11:00- 11:30 Cloud Computing (Web Data Computing, Data Storage) Trends - Tom Sly via Net Conference 11:30 - 12:00 Smart Appliance Trends / Home Area Network Trends - David Najewicz, GE

364

Concept for Management of the Future Electricity System (Smart Grid  

Open Energy Info (EERE)

Concept for Management of the Future Electricity System (Smart Grid Concept for Management of the Future Electricity System (Smart Grid Project) Jump to: navigation, search Project Name Concept for Management of the Future Electricity System Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

365

System team composition for a complex system to enable integration and attribute management  

E-Print Network [OSTI]

The automatic transmission is a very complex system in a modern automobile with several hundred components performing mechanical, hydraulic and electronic functions. System integration and attribute management are key ...

Krishnaswami, Ram, 1966-

2004-01-01T23:59:59.000Z

366

Federal Emergency Management Information System (FEMIS). Data Management Guide, FEMIS: Phase 1, Version 1.1u  

SciTech Connect (OSTI)

The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that is being developed under the direction of the U.S. Army Chemical and Biological Defense Command. The FEMIS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain the data resources in the system.

Burnett, R.A.; Johnson, D.M.; Johnson, S.M. [and others

1995-06-01T23:59:59.000Z

367

Managing Manure with Biogas Recovery Systems  

E-Print Network [OSTI]

such as natural gas, propane, and fuel oil. Biogas can also be flared to control odor if energy recovery: a digester, a gas-handling system, a gas-use device, and a manure storage tank or pond to hold the treat- ed.g., storage tanks, storage ponds, lagoons). These benefits include odor control, improved air and water

Mukhtar, Saqib

368

A management information system model for convenience stores  

E-Print Network [OSTI]

Najor Subject: Agricultural Economics A MANAGEMENT INFORMATION SYSTEM MODEL FOR CONVENIENCE STORES A Thesfs by ERIC ARNE MOEDE Approved as to style and content by: Chairman of o ittee Dr. Willfam J. stine Head of Department Dr. Clfve R. Harston... Member Dr. Samuel M. Gillespie Mem er Dr, John I. Reynolds Member Dr. Thomas L. Sporleder December 1978 ABSTPJ CT A Management Information System I'1odel For Convenience Stores (December lg78 l Eric Arne I'loede, B. B. A. , Texas ARM University...

Moede, Eric Arne

1978-01-01T23:59:59.000Z

369

Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS).  

SciTech Connect (OSTI)

Sandia National Laboratories was tasked with developing the Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS) with the sponsorship of NA-125.3 and the concurrence of DOE/NNSA field and area offices. The purpose of IIIMS was to modernize nuclear materials management information systems at the enterprise level. Projects over the course of several years attempted to spearhead this modernization. The scope of IIIMS was broken into broad enterprise-oriented materials management and materials forecasting. The IIIMS prototype was developed to allow multiple participating user groups to explore nuclear material requirements and needs in detail. The purpose of material forecasting was to determine nuclear material availability over a 10 to 15 year period in light of the dynamic nature of nuclear materials management. Formal DOE Directives (requirements) were needed to direct IIIMS efforts but were never issued and the project has been halted. When restarted, duplicating or re-engineering the activities from 1999 to 2003 is unnecessary, and in fact future initiatives can build on previous work. IIIMS requirements should be structured to provide high confidence that discrepancies are detected, and classified information is not divulged. Enterprise-wide materials management systems maintained by the military can be used as overall models to base IIIMS implementation concepts upon.

Aas, Christopher A.; Lenhart, James E.; Bray, Olin H.; Witcher, Christina Jenkin

2004-11-01T23:59:59.000Z

370

MAS 10.1 Implementation of the Integrated Safety Management System...  

Broader source: Energy.gov (indexed) [DOE]

MAS 10.1 Implementation of the Integrated Safety Management System (ISMS) Process in Maintenance Activities, 2142000 MAS 10.1 Implementation of the Integrated Safety Management...

371

Understanding collaboration in inter-organisational information systems: Implications for supply chain management.  

E-Print Network [OSTI]

??This thesis seeks to explore how management can work together to adopt an Inter-organisational Information System (IOIS) for Supply Chain Management (SCM) at different levels… (more)

Pang, Vincent Ying Kiun

2008-01-01T23:59:59.000Z

372

Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.3  

SciTech Connect (OSTI)

The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the (Pacific Northwest National Laboratory) (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. 91 This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login, privileges, and usage. The system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment.

Burford, M.J.; Burnett, R.A.; Downing, T.R. [and others

1996-12-01T23:59:59.000Z

373

The Bachelor of Management degree in Management Information Systems is a minimum of 40 courses in length. Admission to the Faculty may occur at the end of Year One. Students are required to have the following courses for  

E-Print Network [OSTI]

The Bachelor of Management degree in Management Information Systems is a minimum of 40 courses ManagementInformationSystems Name: __________________________________________________________ ID 4840 - Systems Analysis Management 4841 - Systems Design One of: Management 3380 - Technological Change

Seldin, Jonathan P.

374

DISTRIBUTED SYSTEMS MANAGEMENT AS A GROUP ACTIVITY Graham Dean, Tom Rodden, Ian Sommerville and David Hutchison  

E-Print Network [OSTI]

DISTRIBUTED SYSTEMS MANAGEMENT AS A GROUP ACTIVITY Graham Dean, Tom Rodden, Ian Sommerville@comp.lancs.ac.uk It is important to consider systems management as part of a whole organisational management strategy and, as such within the terms of reference associated with systems management. INTRODUCTION Traditionally, network

Sommerville, Ian

375

Servicebased Systems Management: Using CORBA as a Middleware for Intelligent Agents  

E-Print Network [OSTI]

Service­based Systems Management: Using CORBA as a Middleware for Intelligent Agents NM M TEAM Systems: Operations & Management, L'Aquila, Italy, October 1996 Abstract Management of large in the field of network and systems management. This paper analyses the suitability of CORBA for integrated

376

2001, HCS Research Lab. All Rights Reserved. Achieving Scalable Cluster System Analysis and Management  

E-Print Network [OSTI]

-based cluster system analysis and management. Among these services is the ability to detect network and node for distributed computing integrated into a cluster management system. Previous approaches to cluster management in a non-proprietary fashion. This cluster management system employs gossip techniques to address

George, Alan D.

377

SP 800-128. Guide for Security-Focused Configuration Management of Information Systems  

Science Journals Connector (OSTI)

The purpose of Special Publication 800-128, Guide for Security-Focused Configuration Management of Information Systems, is to provide guidelines for organizations responsible for managing and administering the security of federal information systems ... Keywords: Configuration management, SecCM, control, information systems, monitoring, risk management framework, security content automation protocol (SCAP), security program, security-focused continuous monitoring

L. Arnold Johnson; Kelley L. Dempsey; Ronald S. Ross; Sarbari Gupta; Dennis Bailey

2011-08-01T23:59:59.000Z

378

Use of energy management systems for performance monitoring of industrial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Use of energy management systems for performance monitoring of industrial Use of energy management systems for performance monitoring of industrial load-shaping measures Title Use of energy management systems for performance monitoring of industrial load-shaping measures Publication Type Journal Article Year of Publication 1988 Authors Akbari, Hashem, Mashuri Warren, Anibal De T. Almeida, Deborah J. Connell, and Jeffrey P. Harris Journal Energy Volume 13 Pagination 253-263 Abstract We have studied the use of industrial energy management and control systems (EMCSs) for monitoring the performance of electric load-shaping measures in three of California's most electricity-intensive and rapidly growing industrial sectors: food, plastics, and computing equipment and electronics. In this paper, we summarize current load-shaping strategies, report on the current use of EMCSs in selected industries, and recommend ways for electric utility companies to verify the potential of EMCSs for performance monitoring. We conclude that EMCSs can be used to collect and store data for evaluating industrial load shaping. Some sophisticated EMCSs are currently being used for this purpose, mostly in larger electronics firms. Most EMCSs now available need to be customized to monitor a particular facility. We also conclude that electric utility companies can encourage the use of EMCSs for performance monitoring by helping to educate their industrial customers about EMCSs, establishing protocols to standardize communication between EMCSs, and testing EMCSs with data-logging functions at demonstration sites.

379

Mercury and Freon: Temperature Emulation and Management for Server Systems  

E-Print Network [OSTI]

Mercury and Freon: Temperature Emulation and Management for Server Systems Taliver Heath Dept by simulators and real measurements. In this paper, we introduce Mercury, a soft- ware suite that avoids data. Most importantly, Mercury runs the entire software stack natively, enables repeatable experiments

Bianchini, Ricardo

380

A flexible information management system for supporting manufacturing activities  

Science Journals Connector (OSTI)

The lack of seamless information interchange hinders the accomplishment of manufacturing activities, which are related to the efficient bi-directional flow of information, coordination of decisions and enhancement of assimilation of practices within ... Keywords: data exchange, flexibility, information flow, information management, information sharing, information systems, manufacturing activities, object technology

G. T. S. Ho; H. C. W. Lau; C. K. M. Lee; A. W. H. Ip

2007-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Department of Management Science and Information Systems Seminar  

E-Print Network [OSTI]

Department of Management Science and Information Systems Seminar You are cordially invited, to provide a methodology for generating the conditional price-transition probabilities, as required's eBay store. We are using a model where each period there is a probability a price-transition occurs

Lin, Xiaodong

382

SOLAR IRRADIANCE FORECASTING FOR THE MANAGEMENT OF SOLAR ENERGY SYSTEMS  

E-Print Network [OSTI]

SOLAR IRRADIANCE FORECASTING FOR THE MANAGEMENT OF SOLAR ENERGY SYSTEMS Detlev Heinemann Oldenburg.girodo@uni-oldenburg.de ABSTRACT Solar energy is expected to contribute major shares of the future global energy supply. Due to its and solar energy conversion processes has to account for this behaviour in respective operating strategies

Heinemann, Detlev

383

Intelligent demand side energy management system for autonomous polygeneration microgrids  

Science Journals Connector (OSTI)

Autonomous polygeneration microgrids is a novel approach in addressing the needs of remote areas. These needs can include power, fuel for transportation in the form of hydrogen, potable water through desalination and space heating and cooling. This approach has been investigated technically and economically and has proved viable. Further research has taken place in the supervisory management of this topology using computational intelligence techniques like fuzzy logic, which has optimized the concept minimizing the sizes of the installed components. The optimal design of the system can meet, though, only the design principles and needs. In reality experience has shown that most autonomous power systems operate out of specifications very shortly after installation or after a couple of years new needs arise and it is not possible economic wise for the people to extend it. In these cases the microgrid would struggle to cover the increased needs and in the end fail, causing blackouts. A solution to this is partial load shedding in an intelligent manner. This paper presents a multi agent system for intelligent demand side management of the polygeneration microgrid topology which also includes grey prediction algorithms for better management. This approach can also be used for designing the optimal polygeneration microgrid for a given amount of an investment. The results show that the proposed intelligent demand side management system can address its design principles successfully and guaranty the most effective operation even in conditions near and over the limits of the design specification of the autonomous polygeneration microgrid.

George Kyriakarakos; Dimitrios D. Piromalis; Anastasios I. Dounis; Konstantinos G. Arvanitis; George Papadakis

2013-01-01T23:59:59.000Z

384

The Do and Check Processes of an Energy Management System  

Broader source: Energy.gov [DOE]

This presentation covers the Do and Check processes of an Energy Management System. "Do" processes include training, documents, operational control, communication, design, and procurement. "Check" processes include measuring and monitoring, legal requirements, internal auditing, non-conformance (corrective and preventive), and records.

385

An ontology-based approach to information systems security management  

Science Journals Connector (OSTI)

Complexity of modern information systems (IS), impose novel security requirements. On the other hand, the ontology paradigm aims to support knowledge sharing and reuse in an explicit and mutually agreed manner. Therefore, in this paper we set the foundations ... Keywords: IS security, security management, security ontology, security policy

Bill Tsoumas; Stelios Dritsas; Dimitris Gritzalis

2005-09-01T23:59:59.000Z

386

Aviation Safety + Security Program GLOBAL EXPERTS IN SAFETY MANAGEMENT SYSTEMS  

E-Print Network [OSTI]

2011- 2012 Aviation Safety + Security Program GLOBAL EXPERTS IN SAFETY MANAGEMENT SYSTEMS of aviation safety. Endings signal new beginnings and new beginnings mean evolving challenges for safety. This was the world in which the USC Aviation Safety and Security Program was born in 1952 and this is the world

Wang, Hai

387

Nuclear Materials Management and Safeguards System Reporting and Data Submission  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The manual provides clear and detailed instructions and procedures for documenting and reporting data submissions for nuclear materials transactions, inventories, and material balances to the Nuclear Materials Management and Safeguards System (NMMSS). Cancels DOE 5633.3B. Canceled by DOE M 474.1-2A.

1998-02-10T23:59:59.000Z

388

RECOMMENDATIONS FOR EFFECTIVE SEPTIC SYSTEM MANAGEMENT IN THE  

E-Print Network [OSTI]

stated that, "properly managed [and sited] decentralized wastewater systems can provide the treatment were historically rural with many small communities but few large cities. Due to their close proximity of the wastewater forms the middle layer, called clarified sewage (or liquid effluent). Solids in the tank undergo

Rosemond, Amy Daum

389

A Model-Driven Architecture for Electronic Service Management Systems  

E-Print Network [OSTI]

A Model-Driven Architecture for Electronic Service Management Systems Giacomo Piccinelli1}@hp.com Abstract. Mainly on the wake of the Web Service initiative, electronic services are emerging as a reference of the different applications sustaining such capabilities. The effective realisation of an electronic ser- vice

Emmerich, Wolfgang

390

DECISION SUPPORT SYSTEM FOR MANAGEMENT OF WATER SOURCES  

E-Print Network [OSTI]

DECISION SUPPORT SYSTEM FOR MANAGEMENT OF WATER SOURCES Nejc Trdin1, 2 , Marko Bohanec1 , Mitja.bohanec}@ijs.si, mitja.janza@geo-zs.si ABSTRACT Meeting the quality criteria for drinking water is one of the areas which of data collected while monitoring water adequacy, an expert carries a large burden and also his decisions

Bohanec, Marko

391

Fuel Cell Systems Sensors Air Management Benchmarking Modeling  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Systems Systems F u e l P r o c e s s o r Sensors Air Management Benchmarking Modeling Patrick Davis Patrick Davis Targets and Status 50 kWe (net) Integrated Fuel Cell Power System 5000 2000 1000 Hours Durability 45 125 275 $/kW Cost (including H2 storage) 650 500 400 W/L Power density (w/o H2 stor) Operating on direct hydrogen 5000 2000 1000 Hours Durability 45 125 325 $/kW Cost 325 250 140 W/L Power density Operating on Tier 2 gasoline containing 30 ppm sulfur, average 2010 2005 2003 status Units Characteristics Projects Fuel Cell Power Systems Analysis ANL NREL TIAX Directed Technologies, Inc. TIAX TIAX * Fuel Cell Systems Analysis * Fuel Cell Vehicle Systems Analysis * Cost Analyses of Fuel Cell Stacks/ Systems * DFMA Cost Estimates of Fuel Cell/ Reformer Systems at Low, Medium, & High Production Rates * Assessment of Fuel Cell Auxiliary

392

Fault diagnosis and management system for switched reluctance motor drives  

Science Journals Connector (OSTI)

An effective detection and diagnosis of faults is desirable for online condition monitoring, assessment, product quality assurance and improved operational efficiency of Switched Reluctance Motor (SRM) drives. The proposed fault diagnosis and management system uses the measured phase voltages, currents and speed of the motor. In this article, a Matlab/Simulink model-based fault diagnosis system is developed and simulated for SRM drive. The simulation results show that the SRM drive is capable of operating under faulty conditions.

S. Vijayan; S. Paramasivam

2008-01-01T23:59:59.000Z

393

Office of Legacy Management  

Broader source: Energy.gov (indexed) [DOE]

December 1.7, 2010 December 1.7, 2010 MEMORANDUM FOR DAVID W. GEISER, DIRECTOR, DOE-LM- 1 FROM: TRACY A. RIBEIRO, ENVIRONMENTAL PROGRAM MANAGER, DOE-LM , f , ,,, Tracy R i b e ~ r o n / / 2010.1 2 17 08:47:34 -07'00' SUBJECT: Approval of FY 201 1 EMS Goals and Initiatives In accordance with the requirements of the DOE-LM Environmental Management System Description, the highlighted EMS goals and initiatives for FY 201 1 are enclosed for your formal approval. The EMS goals and initiatives align with DOE Order 450.1 A, Environmental Protection Program; DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management; the Transformational Energy Action Management (TEAM) Initiative, Executive Order 13423, Strengthening Federal Environmental, Energy and Transportation Management,

394

SYRMA: a tool for a system approach to risk management in mission critical systems  

Science Journals Connector (OSTI)

Managing risks and taking steps to reduce risks at acceptable level are considered as strategic objectives for organisations in almost any application domain. It is widely recognised that a system-oriented approach is needed to effectively manage risks in complex and mission critical systems. Well-known standard approaches to risk management exist and some frameworks and best practices have reached a high level of completeness and suitability in the different possible application scenarios. Nonetheless, we realised that poor support is offered towards the adoption of system-oriented approaches to risk management. This paper proposes a web-based application, named systemic risk management (SYRMA), to effectively support a system approach to risk management, especially in the case of complex and mission critical systems. SYRMA is based on a conceptual model that identifies main entities in risk management and their relations with resources of the target organisation. Identified relationships among model entities facilitate the provision of a synoptic overview of incidents, possible risks and risk-related information. Finally, we describe how SYRMA has been implemented as a prototype for the healthcare sector.

Gionni Bernardini; Federica Paganelli; Mauro Manetti; Alessandro Fantechi; Ernesto Iadanza

2013-01-01T23:59:59.000Z

395

The interactive on-site inspection system: An information management system to support arms control inspections  

SciTech Connect (OSTI)

The increasing use of on-site inspection (OSI) to meet the nation`s obligations with recently signed treaties requires the nation to manage a variety of inspection requirements. This document describes a prototype automated system to assist in the preparation and management of these inspections.

DeLand, S.M.; Widney, T.W.; Horak, K.E.; Caudell, R.B.; Grose, E.M.

1996-12-01T23:59:59.000Z

396

Post-Retrocommissioning HVAC Operations Monitoring Using Enterprise-Wide energy Management System  

E-Print Network [OSTI]

Post-retrocommissioning HVAC Operations Monitoring Using Enterprise-wide Energy Management System Narendra Amarnani Project Manager Brian Roberts Section Manager County of Los Angeles – ISD Los Angeles, California, USA Howard Choy... earned a graduate degree from Cal Poly University, Pomona. He is a Certified Energy Manager, a LEED® AP, and a Certified Energy Plan Examiner. Brian’s is the Section Manager of the Systems Section within Energy Management Division. His...

Amarnani, N.; Roberts, B.; Choy, H.

2007-01-01T23:59:59.000Z

397

EM Waste and Materials Disposition & Transportation | Department...  

Office of Environmental Management (EM)

EM Waste and Materials Disposition & Transportation EM Waste and Materials Disposition & Transportation DOE's Radioactive Waste Management Priorities: Continue to manage waste...

398

u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DETERlIIINATION  

Broader source: Energy.gov (indexed) [DOE]

EM EM ENT CENTER NEPA DETERlIIINATION RECIPIENT:TEXAS COMPTROLLER OF PUBLIC ACCOUNTS PROJECT TITLE; ARRA SEP SINTON ISD WIND PROJECT Page lof 2 STATE: TX Funding Opportunity Announctment Num~r Proc:urtmtnl Instrument Numbn N[PA Control Numbrr em Number DE-EEOOOO116 EEOOOO116 EEll6 Baud on my review o(thc information concerning the proposed action, as NEPA Compliance Officer (authoriud undu DOE Order 45I.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to. literature surveys, inventories, audits), data analysis (inCluding computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies). and dissemination (including. but not limited to, document mailings. publication. and distribution;

399

iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management  

Broader source: Energy.gov (indexed) [DOE]

MANAGEMENT MANAGEMENT & ADMINISTRATION - STRIPES * Template - January 30,2009, Version 2 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. Module I - Privacy Needs Assessment Date Departmental Element & Site Name of Information System or IT Project Exhibit Project UIO April 21, 2009 Office of the Chief Financial Officer, Office of Corporate Information Systems, CF-40 Germantown, U.S. Department of Energy, DOE Headquarters, Germantown, hosted in the OCIO's Application Hosting Environment (AHE) in the CA-007 server

400

International Border Management Systems (IBMS) Program : visions and strategies.  

SciTech Connect (OSTI)

Sandia National Laboratories (SNL), International Border Management Systems (IBMS) Program is working to establish a long-term border security strategy with United States Central Command (CENTCOM). Efforts are being made to synthesize border security capabilities and technologies maintained at the Laboratories, and coordinate with subject matter expertise from both the New Mexico and California offices. The vision for SNL is to provide science and technology support for international projects and engagements on border security.

McDaniel, Michael; Mohagheghi, Amir Hossein

2011-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

The Industrial Power Plant Management System - An Engineering Approach  

E-Print Network [OSTI]

THE INDUSTRIAL POWER PLANT MANAGEMENT SYSTEM AN ENGINEERING APPROACH Seppo E. Aarnio, Heikki J. Tarvainen and Valentin Tinnis EKONO Oy, Helsinki, Finland EKONO Inc., Bellevue, Washington ABSTRACT Based on energy studies in over 70 plants... in Finland. The results of the optimization calculations are used for two types of operations guidance. The first duty of the operators is to adjust the determined set points for the most economic loading, fuel firing and purchasing of power. This is done...

Aarnio, S. E.; Tarvainen, H. J.; Tinnis, V.

1979-01-01T23:59:59.000Z

402

SPTP: A Trust Management Protocol for Online and Ubiquitous Systems  

Science Journals Connector (OSTI)

With the recent proliferation of ubiquitous, mobile and cloud-based systems, security, privacy and trust concerns surrounding the use of emerging technologies in the ensuing wake of the Internet of Things (IoT) continues to mount. In most instances, ... Keywords: Privacy Framework, SPT, Security, Trust Management, Trust and Privacy Protocol, Cloud, Collective Intelligence, mHealth, Ubiquitous Computing, Mobile Computing, Online Advertising Privacy

Ivor D. Addo, Ji-Jiang Yang, Sheikh I. Ahamed

2014-07-01T23:59:59.000Z

403

The Application of the Campus Experimental Project Management System Based on Intranet Technology  

Science Journals Connector (OSTI)

According to the characteristics of the management workflow in the department of experimental management of teaching administration, a solution of the campus experimental project management system based on Intranet technology has been designed. The solution, by adopting Internet technology and the system structure of Brower/Server to analysis and design the campus experimental project management system, will make all the management workers in laboratory on campus enter the system, and complete the all the tasks about the logging, maintenance and printing of data. The system, being put into use, will make the data of laboratory project management more accurate timely, as well as easier to maintain.

Zhou Shandan; Feng Dan; Chen Li; Xu Yunyun

2012-01-01T23:59:59.000Z

404

U-201: HP System Management Homepage Bugs Let Remote Users Deny...  

Broader source: Energy.gov (indexed) [DOE]

01: HP System Management Homepage Bugs Let Remote Users Deny Service U-201: HP System Management Homepage Bugs Let Remote Users Deny Service June 28, 2012 - 7:00am Addthis PROBLEM:...

405

EM News  

Broader source: Energy.gov (indexed) [DOE]

news-archive Office of Environmental Management 1000 Independence Ave., SW Washington, DC 20585 202-586-7709 en Head of EM Visits Waste Isolation Pilot Plant for First Underground...

406

Management of Imported Fire Ants in Cattle Production Systems  

E-Print Network [OSTI]

This publication can help ranch managers develop integrated pest management plans for managing fire ant problems in cattle operations. It covers the specifics of managing fire ants in hay pastures and rangelands, around farm ponds, and near...

Fuchs, Thomas W.; Drees, Bastiaan M.

2004-03-31T23:59:59.000Z

407

Experience with the EM-60 electromagnetic system for geothermal exploration in Nevada  

SciTech Connect (OSTI)

Lawrence Berkeley Laboratory (LBL) conducted controlled-source electromagnetic (EM) surveys at three geothermal prospects in northern Nevada. Over 40 soundings were made in Panther Canyon (Grass Valley), near Winnemucca; Soda Lakes, near Fallon; and McCoy, west of Austin, to test and demonstrate the applicability of LBL's EM-60 system to geothermal exploration. The EM-60 is a frequency-domain system using three-component magnetic detection. Typically, +-65 A is applied to an 100-m-diameter four-turn horizontal loop, generating a dipole moment >10/sup 6/ MKS over the frequency range 10/sup -3/ to 10/sup -3/ Hz. With such a source loop, soundings were made, at transmitter-receiver separations of up to 4 km, providing a maximum depth of penetration of 4 km.

Wilt, M.; Goldstein, N.E.; Stark, M.; Haught, J.R.; Morrison, H.F.

1981-09-01T23:59:59.000Z

408

Scalable PGAS Metadata Management on Extreme Scale Systems  

SciTech Connect (OSTI)

Programming models intended to run on exascale systems have a number of challenges to overcome, specially the sheer size of the system as measured by the number of concurrent software entities created and managed by the underlying runtime. It is clear from the size of these systems that any state maintained by the programming model has to be strictly sub-linear in size, in order not to overwhelm memory usage with pure overhead. A principal feature of Partitioned Global Address Space (PGAS) models is providing easy access to global-view distributed data structures. In order to provide efficient access to these distributed data structures, PGAS models must keep track of metadata such as where array sections are located with respect to processes/threads running on the HPC system. As PGAS models and applications become ubiquitous on very large transpetascale systems, a key component to their performance and scalability will be efficient and judicious use of memory for model overhead (metadata) compared to application data. We present an evaluation of several strategies to manage PGAS metadata that exhibit different space/time tradeoffs. We use two real-world PGAS applications to capture metadata usage patterns and gain insight into their communication behavior.

Chavarría-Miranda, Daniel; Agarwal, Khushbu; Straatsma, TP

2013-05-16T23:59:59.000Z

409

Substation based data interpretation techniques for improved power system management  

SciTech Connect (OSTI)

There is now considerable pressure on electric utilities to operate their systems in the most efficient manner possible and to provide increased quality of service to customers. This pressure, coupled with the decreasing availability of reserve margins dictates that there is a requirement for comprehensive system operation support through, among other things, the provision of quality information relating to the behavior of the primary and secondary systems. This paper will show how the data available within modern substation control and management systems can be exploited in a cost-effective manner, through the implementation of advanced substation functions in an open systems environment. Certain functions which are presently carried out at the control center could be distributed (or partially distributed) to the substation. These functions may provide the utility staff with quality information, which can in turn be used to satisfy the objectives of increasing quality and security of supply, in addition to optimizing the utility`s information, maintenance and asset management functions.

Booth, C.; McDonald, J.R. [Univ. of Strathclyde, Glasgow (United Kingdom). Centre for Electrical Power Engineering] [Univ. of Strathclyde, Glasgow (United Kingdom). Centre for Electrical Power Engineering; Laycock, W.J.

1997-04-01T23:59:59.000Z

410

Quality Management Systems for Zero Energy Ready Home Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Quality Management Systems for Zero Energy Ready Home, presented in October 2014.

411

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

SciTech Connect (OSTI)

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

412

Creating security applications based on The Global Certificate Management System  

Science Journals Connector (OSTI)

The Certificate Management System (CMS) is a global network system whose primary services are generation, distribution, storage and verification of certificates. It supports various security applications which use public key cryptography by providing the means for the administration of certificates. This paper describes the interface between security enhanced application and the CMS. The interface layer with which the security applications are extended is named CMS Client. The CMS Client comprises a set of functions that enable the certification of users of security applications, retrieval of certificates and verification of retrieved certificates. The paper gives a short description of the CMS system and a detailed description of the CMS Client functions. Furthermore it describes how to extend the existing or create new security applications based on the CMS system.

Nada Kapidzic

1998-01-01T23:59:59.000Z

413

National Ignition Facility Cryogenic Target Systems Interim Management Plan  

SciTech Connect (OSTI)

Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety & Health (ES&H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for delivering this system will be decided at the national level, based on experiment campaign requirement dates that will be derived through this process. The current milestone date for achieving indirect-drive ignition on the NIF is December 2010. Maintaining this milestone requires that the cryogenic systems be complete and available for fielding experiments early enough that the planned experimental campaigns leading up to ignition can be carried out. The capability of performing non-ignition cryogenic experiments is currently required by March 2006, when the NIF's first cluster of beams is operational. Plans for cryogenic and non-cryogenic experiments on the NIF are contained in NNSA's Campaign 10 Program Plans for Ignition (MTE 10.1) and High Energy Density Sciences (MTE 10.2). As described in this document, the NCTS Program Manager is responsible for managing NIF Cryogenic Target Systems development, engineering, and deployment. Through the NIF Director, the NCTS Program Manager will put in place an appropriate Program Execution Plan (draft attached) at a later time consistent with the maturing and funding these efforts. The PEP will describe management methods for carrying out these activities.

Warner, B

2002-04-25T23:59:59.000Z

414

Integrated support for working with guidelines: the Sherlock guideline management system  

Science Journals Connector (OSTI)

......Technology-Hellas Science and Technology...Sherlock Guideline Management System. Sherlock...phases. One recent approach in this direction...Sherlock Guideline Management System are presented...user interface management system, as well...recently as an approach to making designers......

D Grammenos; D Akoumianakis; C Stephanidis

2000-01-01T23:59:59.000Z

415

Towards a Self-Adaptive Data Management System for Cloud Environments Alexandra Carpen-Amarie  

E-Print Network [OSTI]

Towards a Self-Adaptive Data Management System for Cloud Environments Alexandra Carpen-Amarie INRIA is efficient and reliable data management. More specifically, storage systems intended for very large scales efficient data- management system, they also imply a high degree of complexity in the configuration

Paris-Sud XI, Université de

416

Minor in Agricultural Systems Management The Department of Biological and Agricultural Engineering  

E-Print Network [OSTI]

Minor in Agricultural Systems Management Offered by The Department of Biological and Agricultural Engineering College of Agriculture and Life Sciences The minor in Agricultural Systems Management is available systems management. The courses listed below constitute the 18 hours required for a minor in Agricultural

417

Impact of Virtualization on Management Systems Sven Graupner, Ralf Knig, Vijay Machiraju, Jim Pruyne,  

E-Print Network [OSTI]

Impact of Virtualization on Management Systems Sven Graupner, Ralf König, Vijay Machiraju, Jim HPL-2003-125 June 23rd , 2003* E-mail: {firstname.lastname}@hp.com virtualization, system management into enterprise IT infrastructures and will have impact on management systems. In this paper we review some

Newcastle upon Tyne, University of

418

A TMN system for VPC and routing management in ATM networks  

E-Print Network [OSTI]

A TMN system for VPC and routing management in ATM networks D. P. Griffin Institute of Computer, these parameters and subsequently the routes based on them can be configured on-line by a management system and Routing management system is required to take advantage of the features of VPCs while ensuring

Griffin, David

419

An Intelligent Multi Agent System for Integrated Control & Asset Management of Petroleum Production Facilities  

E-Print Network [OSTI]

An Intelligent Multi Agent System for Integrated Control & Asset Management of Petroleum Production management system for the offshore oil and gas industry in Atlantic Canada. The research program has achieved several milestones. The conceptual model of an automated asset management system, its architecture

Taylor, James H.

420

2-1 2001 SITE ENVIRONMENTAL REPORT CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM  

E-Print Network [OSTI]

2-1 2001 SITE ENVIRONMENTAL REPORT CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM 2001 SITE ENVIRONMENTAL REPORT Environmental Management System B R O O K H A V E N N A T I O N A L L A B O R A T O R Y's Environmental Management System has an emphasis on compliance assurance, pollution prevention, and community

Homes, Christopher C.

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Service-based Systems Management: Using CORBA as a Middleware for Intelligent Agents  

E-Print Network [OSTI]

Service-based Systems Management: Using CORBA as a Middleware for Intelligent Agents NMM TEAM@informatik.uni-muenchen.de Proceedings of the IFIP/IEEE International Workshop on Distributed Systems: Operations & Management, L (CORBA) which is gaining increasing impor- tance in the field of network and systems management

422

ESDIS_ISO Trng_Nov2010.docx Management System Training  

E-Print Network [OSTI]

ESDIS_ISO Trng_Nov2010.docx Management System Training ESDIS Project (November 2010) The Goddard Quality Manual and supporting directives and procedures identify the Management System (MS) process and their application throughout GSFC. All organizational elements of GSFC shall conform to the Management System. (Note

Christian, Eric

423

Systems Management with Distributed Objects: Porting SNMP Agents to a CORBA Environment  

E-Print Network [OSTI]

Systems Management with Distributed Objects: Porting SNMP Agents to a CORBA Environment NMM TEAM systems as well. It is therefore important to supply CORBA- compliant agents which enable the management of these systems in an efficient manner. Currently, this is not the case: while no such CORBA-compliant management

424

2-1 1999 SITE ENVIRONMENTAL REPORT CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM  

E-Print Network [OSTI]

2-1 1999 SITE ENVIRONMENTAL REPORT CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM In 1999, Brookhaven National Laboratory continued to develop and implement an Environmental Management System to ensure that it operates in an environmentally responsible manner. The Laboratory's Environmental Management System

425

2-1 SITE ENVIRONMENTAL REPORT 2000 CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM  

E-Print Network [OSTI]

2-1 SITE ENVIRONMENTAL REPORT 2000 CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM SITE ENVIRONMENTAL REPORT 2000 Environmental Management System B R O O K H A V E N N A T I O N A L L A B O R A T O R Y Chapter 2 In 2000, BNL continued to implement and enhance its Environmental Management System to ensure

Homes, Christopher C.

426

Systems Management with Distributed Objects: Porting SNMP Agents to a CORBA Environment  

E-Print Network [OSTI]

Systems Management with Distributed Objects: Porting SNMP Agents to a CORBA Environment NM M TEAM the management of these systems in an efficient manner. Currently, this is not the case: while no such CORBA. Keywords: CORBA, Distributed Objects, Distributed Systems Management, Middleware 1 Introduction

427

A Policy Management System for Hybrid Networks N Vardalachos, J Rubio, A Galis and J Serrat  

E-Print Network [OSTI]

A Policy Management System for Hybrid Networks N Vardalachos, J Rubio, A Galis and J Serrat management system for this type of networks. 1. Introduction In recent years it has become apparent management system has been designed by applying mainly Open Distributed Processing (ODP) principles taking

Haddadi, Hamed

428

PRS -- A priority ranking system for managing pipeline integrity  

SciTech Connect (OSTI)

Pipeline operating companies have a huge investment in pipelines that vary in age from recent construction to more than 50 years old. Aging pipelines contain a variety of operational integrity concerns that most often begin to show up as leaks, but sometimes result in ruptures if not detected soon enough. Fluor Daniel Williams Brothers (FDWB) has developed a management tool that helps pipeline operating companies address this concern and take a proactive approach to pipeline integrity management. Using this methodology, a Priority Ranking System (PRS) is developed which allows early detection and resolution of pipeline integrity concerns. When fully developed, it includes a spreadsheet of annual budgets related to pipeline integrity work and a complete historical record of inspection and rehabilitation results.

Hodgdon, A.M. [Fluor Daniel Williams Brothers, Houston, TX (United States); Wernicke, T. [Texas Utilities Fuel Co., Dallas, TX (United States)

1997-05-01T23:59:59.000Z

429

Waste Heat Management Options: Industrial Process Heating Systems  

Broader source: Energy.gov (indexed) [DOE]

Heat Management Options Heat Management Options Industrial Process Heating Systems By Dr. Arvind C. Thekdi E-mail: athekdi@e3minc.com E3M, Inc. August 20, 2009 2 Source of Waste Heat in Industries * Steam Generation * Fluid Heating * Calcining * Drying * Heat Treating * Metal Heating * Metal and Non-metal Melting * Smelting, agglomeration etc. * Curing and Forming * Other Heating Waste heat is everywhere! Arvind Thekdi, E3M Inc Arvind Thekdi, E3M Inc 3 Waste Heat Sources from Process Heating Equipment * Hot gases - combustion products - Temperature from 300 deg. F. to 3000 deg.F. * Radiation-Convection heat loss - From temperature source of 500 deg. F. to 2500 deg. F. * Sensible-latent heat in heated product - From temperature 400 deg. F. to 2200 deg. F. * Cooling water or other liquids - Temperature from 100 deg. F. to 180 deg. F.

430

Integrated Safety Management Policy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Program Management » Quality Assurance » Integrated Services » Program Management » Quality Assurance » Integrated Safety Management Policy Integrated Safety Management Policy This Integrated Safety Management (ISM) System Description (ISMSD) defines how the U.S. Department of Energy (DOE) Office of Environmental Management (EM) integrates environment, safety, and health requirements and controls into Federal work activities, and oversees implementation of ISM within EM federal and contractor activities. It explains our safety values, objectives and approach for ensuring protection to the public, worker and the environment, consistent with DOE Policy 450.4, Safety Management System Policy. The ISMSD describes how EM conducts work following the seven ISM Guiding Principles, the five ISM core functions, and also incorporates the

431

A Policy Management System for Ambient Networks K. Jean and A. Galis, {kjean, agalis}@ee.ucl.ac.uk,  

E-Print Network [OSTI]

A Policy Management System for Ambient Networks K. Jean and A. Galis, {kjean, agalis of Ambient Networks necessitate a new dynamic, distributed policy management system. Existing policy management systems do not provide the required support for mobility, dynamicity and heterogeneity

Haddadi, Hamed

432

IMPLEMENTING AN ISO 14001 ENVIRONMENTAL MANAGEMENT SYSTEM A Case Study of Environmental Training and Awareness at the Vancouver  

E-Print Network [OSTI]

IMPLEMENTING AN ISO 14001 ENVIRONMENTAL MANAGEMENT SYSTEM A Case Study of Environmental Training an ISO 14001 environmental management system: A case study of environmental training and awareness of limiting environmental damage. Environmental management systems (EMSs), such as ISO 14001, provide

433

U.S DEPARTMENT OF ENERGY EERE PROJ ECT MANAG EM ENT CENTER NEPA DFTERlIfiNATION  

Broader source: Energy.gov (indexed) [DOE]

PROJ PROJ ECT MANAG EM ENT CENTER NEPA DFTERlIfiNATION Page 1 of2 RECIPIENT:Brigham City Corporation STATE: UT PROJECT TITLE: Brigham City Hydro Generatioo Project Funding Opportunity Annoum:ement Number Procurement Instrument Number NEPA Control Number CID Number COP DE·FG36-06G086093 GFO-G086093-002 G086093 Based on my review of the information eonccl"Ding tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 4Sl.1A). I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 81 .8 Sc reened water . " . . . Intake and outflow Modifications to screened water Intake and outflow structures such thai .nlake velOCIties and volumes structures and water effluent quality and volumes are consistent with existing permit limits.

434

US. DFPARThITNT OFFNERGY EERE PROJECT MANAG EM ENT CENTER NFPA DFTElU\llNATION  

Broader source: Energy.gov (indexed) [DOE]

DFPARThITNT OFFNERGY DFPARThITNT OFFNERGY EERE PROJECT MANAG EM ENT CENTER NFPA DFTElU\llNATION RECIPIENT:Advanced Magnet Lab, Inc. STATE: FL PROJECT TITLE: A Lightweight, Direct Drive, Fully Superconducting Generator for Large Wind Turbines Page lof3 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number DE-FOA-Q000439 DE-EEOOO5140 GF()'{)()()S1 40-002 G05140 Based on my review orlbe information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 4St.IA),. bave made the following determination: ex. EA, EIS APPENDIX AND NUMBE R: Description: A9 Information gathering, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site visits, and

435

u.s. DEPARTlI'IENT OF ENERGY EE RE PROJECT MANAG EM EN T CEN  

Broader source: Energy.gov (indexed) [DOE]

p)"~·EFl. p)"~·EFl. p.t '.G 1·, u.s. DEPARTlI'IENT OF ENERGY EE RE PROJECT MANAG EM EN T CEN T ER NEPA DETERlVIINATION RECIPIENT:Ohio Department of Development PROJECT TITLE: SEP ARRA - Sidco-Development Page 1 of3 ® STATE: OH Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number EE0000165 GFO-OO OOI65-030 GOO Based on my review of the infonnation concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

436

Depleted Uranium Hexafluoride Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for for DUF 6 Conversion Project Environmental Impact Statement Scoping Meetings November/December 2001 Overview Depleted Uranium Hexafluoride (DUF 6 ) Management Program DUF 6 EIS Scoping Briefing 2 DUF 6 Management Program Organizational Chart DUF 6 Management Program Organizational Chart EM-10 Policy EM-40 Project Completion EM-20 Integration EM-50 Science and Technology EM-31 Ohio DUF6 Management Program EM-32 Oak Ridge EM-33 Rocky Flats EM-34 Small Sites EM-30 Office of Site Closure Office of Environmental Management EM-1 DUF 6 EIS Scoping Briefing 3 DUF 6 Management Program DUF 6 Management Program * Mission: Safely and efficiently manage the DOE inventory of DUF 6 in a way that protects the health and safety of workers and the public, and protects the environment DUF 6 EIS Scoping Briefing 4 DUF 6 Inventory Distribution

437

A Scenario-based Predictive Control Approach to Building HVAC Management Systems  

E-Print Network [OSTI]

A Scenario-based Predictive Control Approach to Building HVAC Management Systems Alessandra Parisio and Air Conditioning (HVAC) systems while minimizing the overall energy use. The strategy uses

Johansson, Karl Henrik

438

Systems and Virtualization Management: Standards and the Cloud. A report on SVM 2013  

Science Journals Connector (OSTI)

Hosted by the Distributed Management Task Force (DMTF) and collocated with the International Conference on Network and Service Management, SVM 2013 was the seventh International DMTF Academic Alliance Workshop on Systems and Virtualization Management ... Keywords: CIM, Cloud, Desktop management, Network, Server, Web services and SOA

Mark Carlson

2014-10-01T23:59:59.000Z

439

Rucio, the next-generation Data Management system in ATLAS  

E-Print Network [OSTI]

Rucio is the next-generation of Distributed Data Management (DDM) system benefiting from recent advances in cloud and "Big Data" computing to address HEP experiments scaling requirements. Rucio is an evolution of the ATLAS DDM system Don Quijote 2 (DQ2), which has demonstrated very large scale data management capabilities with more than 160 petabytes spread worldwide across 130 sites, and accesses from 1,000 active users. However, DQ2 is reaching its limits in terms of scalability, requiring a large number of support staff to operate and being hard to extend with new technologies. Rucio addresses these issues by relying on new technologies to ensure system scalability, cover new user requirements and employ new automation framework to reduce operational overheads. This paper shows the key concepts of Rucio, details the Rucio design, and the technology it employs, the tests that were conducted to validate it and finally describes the migration steps that were conducted to move from DQ2 to Rucio.

Serfon, C; The ATLAS collaboration; Beermann, T; Garonne, V; Goossens, L; Lassnig, M; Nairz, A; Vigne, R

2014-01-01T23:59:59.000Z

440

Report: EM Communications  

Broader source: Energy.gov (indexed) [DOE]

EM Communications EM Communications August 24, 2006 Submitted by: The EMAB Communications Team Background: At the March 2006 Environmental Management Advisory Board (EMAB) meeting, the Assistant Secretary for Environmental Management (EM) and his staff unveiled the proposed organization for EM. The purpose of the reorganization is to structure the workforce across the EM complex in a way that could ensure maximum and sustained focus on EM's mission -"to complete the cleanup of the contaminated nuclear weapons manufacturing and testing sites across the United States". After the presentation, EMAB members noted that a separate communications function was not included in the proposed organization, which EM staff acknowledged was a possible, unmet need.

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Nuclear Materials Management and Safeguards System Working Group Charter  

National Nuclear Security Administration (NNSA)

DRAFT 2011 DRAFT 2011 DRAFT 2011 Nuclear Materials Management and Safeguards System Working Group Charter VERSION: 0 REVISION DATE: May 2011 Approver Name Title Signature Date DRAFT 2011 DRAFT 2011 NMMSS Working Group Charter PURPOSE The NMMSS Working Group (NWG) serves as an open forum for discussion of issues and concerns from the NMMSS User community. The Committee will provide an interface between NMMSS users, NMMSS sponsors and the NMMSS project staff. Activities may include: Identifying user needs Identifying deficiencies in reporting capabilities Recommending upgrades to software capabilities Recommending priorities for modifications Recommending enhancements to data Minimizing the reporting burden on the reporting community

442

Thermodynamic data management system for nuclear waste disposal performance assessment  

SciTech Connect (OSTI)

Thermodynamic property values for use in assessing the performance of a nuclear waste repository are described. More emphasis is on a computerized data base management system which facilitates use of the thermodynamic data in sensitivity analysis and other studies which critically assess the performance of disposal sites. Examples are given of critical evaluation procedures; comparison of apparent equilibrium constants calculated from the data base, with other work; and of correlations useful in estimating missing values of both free energy and enthalpy of formation for aqueous species. 49 refs., 11 figs., 6 tabs.

Phillips, S.L.; Hale, F.V.; Siegel, M.D.

1988-04-01T23:59:59.000Z

443

Federal Emergency Management Information System (FEMIS) system administration guide, version 1.4.5  

SciTech Connect (OSTI)

The Federal Emergency Management Information Systems (FEMIS) is an emergency management planning and response tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the US Army Chemical Biological Defense Command. The FEMIS System Administration Guide provides information necessary for the system administrator to maintain the FEMIS system. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via a Wide Area Network (WAN). Thus, FEMIS is an integrated software product that resides on client/server computer architecture. The main body of FEMIS software, referred to as the FEMIS Application Software, resides on the PC client(s) and is directly accessible to emergency management personnel. The remainder of the FEMIS software, referred to as the FEMIS Support Software, resides on the UNIX server. The Support Software provides the communication, data distribution, and notification functionality necessary to operate FEMIS in a networked, client/server environment. The UNIX server provides an Oracle relational database management system (RDBMS) services, ARC/INFO GIS (optional) capabilities, and basic file management services. PNNL developed utilities that reside on the server include the Notification Service, the Command Service that executes the evacuation model, and AutoRecovery. To operate FEMIS, the Application Software must have access to a site specific FEMIS emergency management database. Data that pertains to an individual EOC`s jurisdiction is stored on the EOC`s local server. Information that needs to be accessible to all EOCs is automatically distributed by the FEMIS database to the other EOCs at the site.

Arp, J.A.; Burnett, R.A.; Carter, R.J. [and others

1998-06-26T23:59:59.000Z

444

(Preliminary draft) Modeling Reputation Management System on Online C2C Market Modeling Reputation Management System on Online C2C Market  

E-Print Network [OSTI]

online transactions in a consumer-to-consumer (C2C) market. We developed a computer simulation model transactions. Keywords: Reputation Management System, C2C market, e-commerce, online market, Agent(Preliminary draft) Modeling Reputation Management System on Online C2C Market Modeling Reputation

Yamamoto, Hitoshi

445

Digitizing the Administrative Records of the U.S. Department of Energy Office of Environmental Management (Em) and Office of Legacy Management (LM) Ohio Sites  

SciTech Connect (OSTI)

As former weapons sites close and are transitioned to the U.S. Department of Energy (DOE) Office of Legacy Management (LM), continued public involvement is essential for the successful turnover of long-term surveillance and maintenance (LTS and M) activities. During the environmental remediation process, public participation was a key factor in cleanup completion. The same level of commitment to encourage active public participation is true for the LTS and M activities at the LM sites, such as the Miamisburg Closure Project and the Fernald Closure Project. Community members participate in the transition and the decision-making processes for LTS and M as they did for the selection of response actions under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup process. [1] A key part of the post-closure activities for the Ohio Sites transitioning to LM from the DOE Office of Environmental Management (EM) is the preservation of site history and stakeholder involvement in the LTS and M activities that will continue during post-closure. In meeting the regulatory requirements of providing the CERCLA Administrative Record Reading Room for public access and to ensure that appropriate records are retrievable and available for all stakeholders, a decision was made to digitize the Miamisburg Closure Project and the Fernald Closure Project Administrative Records. This decision was, in part, based on the information and lessons learned from the digitization of the Rocky Flats Environmental Technology Site (RFETS) CERCLA Administrative Records (AR). The Ohio Sites effort was expanded to include the Living History Project from the Fernald Closure Project. In most cases, the CERCLA AR maintained by EM closure sites and transitioned to LM will provide adequate baselines for identifying and capturing the information required by LM for post-closure stewardship of the sites. The AR established under Section 113(k) [2] of CERCLA serves two primary purposes. First, the record contains those documents that form the basis for selection of a response action and comply with Section 113(j) [3]; judicial review of any issue concerning the adequacy of any response action is limited to the record. Second, Section 113(k) [2] requires that the AR act as a vehicle for public participation in selecting a response action. The AR is the body of documents that 'forms the basis' for the selection of a particular response action at a site and contains historic information that has future study value by scholars, historians, regulators, and other stakeholders. (authors)

Powell, J. [U.S. Department of Energy Office of Legacy Management, Cincinnati, Ohio (United States); Williams, K.; Walpole, S. [S.M. Stoller Corporation, Miamisburg, Ohio (United States); McKinney, R. [Source One Management, Inc., Denver, Colorado (United States)

2007-07-01T23:59:59.000Z

446

Distrbuted Sensing Systems for Water Quality Assesment and Management  

E-Print Network [OSTI]

for environmental management, and in particular, waterenvironmental management efforts at the Environmental Protection Agency (EPA), with a special focus on water-

2007-01-01T23:59:59.000Z

447

Stochastic Modeling and Optimization for Robust Power Management in a Partially Observable System  

E-Print Network [OSTI]

or hard disk. The power management hardware/software monitors the state transition in the systemStochastic Modeling and Optimization for Robust Power Management in a Partially Observable System As the hardware and software complexity grows, it is unlikely for the power management hardware/software to have

Qiu, Qinru

448

Systems Engineering Management Plan for Tank Farm Restoration and Safety Operations Project W-314  

SciTech Connect (OSTI)

The Systems Engineering Management Plan for Project W-314 has been prepared within the guidelines of HNF-SD-WM-SEMP-002, TWRS Systems Engineering Management Plan. The activities within this SEMP have been tailored, in accordance with the TWRS SEMP and DOE Order 430.1, Life Cycle Asset Management, to meet the needs of the project.

MCGREW, D.L.

2000-04-19T23:59:59.000Z

449

Simple models of district heating systems for load and demand side management  

E-Print Network [OSTI]

Simple models of district heating systems for load and demand side management and operational heating systems for load and demand side management and operational optimisation Simple modeller and demand side management and operational optimisation © 2004 by the authors, Department of Mechanical

450

Adaptive Thermal Management for Portable System Batteries by Forced Convection Cooling  

E-Print Network [OSTI]

Adaptive Thermal Management for Portable System Batteries by Forced Convection Cooling Qing Xie the battery longevity increases. This is the first work that formulates the adaptive thermal management is proposed to derive the ATMB policy. Keywords-- battery system; adaptive thermal management; forced

Pedram, Massoud

451

Federal Energy Management Program: EISA Compliance Tracking System Reports  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EISA Compliance Tracking System Reports and Data EISA Compliance Tracking System Reports and Data EISA 432 Overview EISA requires Federal agencies to identify "covered facilities" that constitute at least 75% of their total facility energy use as subject to the requirements of the statute. Each Federal agency must designate an energy manager responsible for implementing the requirements at each covered facility. Comprehensive energy and water evaluations are to be performed at each covered facility every four years to identify potential energy and water efficiency and conservation measures. EISA requires agencies to report progress toward these requirements in CTS, along with: Estimated cost and savings for projects implemented in covered facilities Measured savings for implemented projects

452

DOE technology information management system database study report  

SciTech Connect (OSTI)

To support the missions of the US Department of Energy (DOE) Special Technologies Program, Argonne National Laboratory is defining the requirements for an automated software system that will search electronic databases on technology. This report examines the work done and results to date. Argonne studied existing commercial and government sources of technology databases in five general areas: on-line services, patent database sources, government sources, aerospace technology sources, and general technology sources. First, it conducted a preliminary investigation of these sources to obtain information on the content, cost, frequency of updates, and other aspects of their databases. The Laboratory then performed detailed examinations of at least one source in each area. On this basis, Argonne recommended which databases should be incorporated in DOE`s Technology Information Management System.

Widing, M.A.; Blodgett, D.W.; Braun, M.D.; Jusko, M.J.; Keisler, J.M.; Love, R.J.; Robinson, G.L. [Argonne National Lab., IL (United States). Decision and Information Sciences Div.

1994-11-01T23:59:59.000Z

453

Internet-Based Delivery and Deployment of Document Management Systems Borko Furht, Florida Atlantic University, Boca Raton, Florida  

E-Print Network [OSTI]

) approach implemented by CyLex Systems in deploying document management systems. 1. Introduction Electronic management systems. 2. Present Approaches to Document Management Systems The traditional approach in documentInternet-Based Delivery and Deployment of Document Management Systems Borko Furht, Florida Atlantic

Furht, Borko

454

Integrated Baseline System (IBS). Version 1.03, System Management Guide  

SciTech Connect (OSTI)

This IBS System Management Guide explains how to install or upgrade the Integrated Baseline System (IBS) software package. The IBS is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This guide includes detailed instructions for installing the IBS software package on a Digital Equipment Corporation (DEC) VAX computer from the IBS distribution tapes. The installation instructions include procedures for both first-time installations and upgrades to existing IBS installations. To ensure that the system manager has the background necessary for successful installation of the IBS package, this guide also includes information on IBS computer requirements, software organization, and the generation of IBS distribution tapes. When special utility programs are used during IBS installation and setups, this guide refers you to the IBS Utilities Guide for specific instructions. This guide also refers you to the IBS Data Management Guide for detailed descriptions of some IBS data files and structures. Any special requirements for installation are not documented here but should be included in a set of installation notes that come with the distribution tapes.

Williams, J.R. [Pacific Northwest Lab., Richland, WA (United States); Bailey, S. [Innovative Emergency Management, Inc., Baton Rouge, LA (United States); Bower, J.C. [Bower Software Services, Kennewick, Washington (United States)

1993-01-01T23:59:59.000Z

455

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

456

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

4 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A This metric has been overcome by events. Beginning in FY10, EM projects are to be measured against metric #1 above. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12,

457

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

2 2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

458

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

459

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

8 4 8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

460

Integrating Trust into Grid Resource Management Systems Farag Azzedin and Muthucumaru Maheswaran  

E-Print Network [OSTI]

for providing security in Grid systems including sandboxing, encryption, and other access control for Grid systems and show how the model can be used to incorporate the security implications computing, resource management system, security, trust. 1. Introduction Resource management in Grid systems

Manitoba, University of

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

A dynamic slack management technique for real-time distributed embedded systems  

E-Print Network [OSTI]

This work presents a novel slack management technique, the Service Rate Based Slack Distribution Technique, for dynamic real-time distributed embedded systems targeting the reduction and management of energy consumption. Energy minimization...

Acharya, Subrata

2006-04-12T23:59:59.000Z

462

Development of Energy Consumption Database Management System of Existing Large Public Buildings  

E-Print Network [OSTI]

The statistic data of energy consumption are the base of analyzing energy consumption. The scientific management method of energy consumption data and the development of database management system plays an important role in building energy...

Li, Y.; Zhang, J.; Sun, D.

2006-01-01T23:59:59.000Z

463

Research Disciplines: Ecology ~ Geology ~ Geomorphology ~ Hydrology ~ Pedology ~ Silviculture Systems ~ Wildlife Biology, Ecology, and Management  

E-Print Network [OSTI]

Research Disciplines: Ecology ~ Geology ~ Geomorphology ~ Hydrology ~ Pedology ~ Silviculture Systems ~ Wildlife Biology, Ecology, and Management of Western Hemlock Dwarf Mistletoe in Coastal British.W. Negrave. 2007. Biology, Ecology, and Management of Western Hemlock Dwarf Mistletoe in Coastal British

464

Duke University/Health System Disability Management System, 402 Oregon Street, Box 90142, Telephone: (919) 668-6213 Fax: (919) 668-3977 TTY (919) 668-1329  

E-Print Network [OSTI]

Duke University/Health System Disability Management System, 402 Oregon Street, Box 90142, Telephone,000 ­ Send Accommodation Fund application to the Disability Management System at (919) 668-6213 or leigh be obtained through the Disability Management System, or downloaded from the Disability Management System

Oren, Ram

465

A Unified and Integrated Energy Management System for HVAC Spaces and Power House  

E-Print Network [OSTI]

A UNIFIED AND INTEGRATED ENERGY MANAGEMENT SYSTEM FOR HVAC SPACES AND POWER HOUSE A.Kaya The University of Akron Mechanical Engineering Akron,OH 44325 ABSTRACT This paper describes a totally integrated energy management system throughout... the plant and facilities. The equipment involves: the power flant (boilers, cogeneration turbines, chillers); HVAC 0 buildings; air handling and other distribution systems. The energy management system has the architecture for data transmission...

Kaya, A.; Debban, G. D.

466

Matrix of Marine Data Management Systems Element of System Northeast Ocean Data Portal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Matrix of Marine Data Management Systems Matrix of Marine Data Management Systems Element of System Northeast Ocean Data Portal Website(s) http://northeastoceandata.org/ Mapping application http://www.northeastoceanviewer.org/ Blog or discussion forum Point(s) of contact Daniel Martin, Nick Napoli Geographic area covered Maine, New Hampshire, Massachusetts, Rhode Island, Connecticut Data sources Federal, State Number of data sets 62 Available formats File downloads Web-enabled services http://northeastoceandata.org/data-catalog/web-mapping-services/ Type of server ArcGIS 10 Client Adobe Flex Database File-based Hosting Commercial with plans for Amazon Web Services Cloud Data sharing standards Interfaces supported Meta data catalogs Collaborations with other systems MarineCadastre.gov, MARCO Portal

467

Low-Cost Manufacturable Microchannel Systems for Passive PEM Water Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Manufacturable Manufacturable Microchannel Systems for Passive PEM Water Management IIPS Number 16910 Low Low - - Cost Cost Manufacturable Manufacturable Microchannel Systems for Passive Microchannel Systems for Passive PEM Water Management PEM Water Management IIPS Number 16910 IIPS Number 16910 Ward TeGrotenhuis, Susie Stenkamp, Curt Lavender Pacific Northwest National Laboratories Richland, WA HFCIT Kick Off Meeting February 2007 2 Project objective: Create a low cost and passive PEM water management system Project objective: Project objective: Create a low cost Create a low cost and passive PEM water management system and passive PEM water management system Specific Targets Addressed for 3.4.2 Automotive-Scale: 80 kWe Integrated Transportation Fuel Cell Power Systems Operating on Direct Hydrogen

468

V-174: RSA Authentication Manager Writes Operating System, SNMP, and HTTP  

Broader source: Energy.gov (indexed) [DOE]

4: RSA Authentication Manager Writes Operating System, SNMP, 4: RSA Authentication Manager Writes Operating System, SNMP, and HTTP Plug-in Proxy Passwords in Clear Text to Log Files V-174: RSA Authentication Manager Writes Operating System, SNMP, and HTTP Plug-in Proxy Passwords in Clear Text to Log Files June 10, 2013 - 12:47am Addthis PROBLEM: RSA Authentication Manager Writes Operating System, SNMP, and HTTP Plug-in Proxy Passwords in Clear Text to Log Files PLATFORM: RSA Authentication Manager 8.0 ABSTRACT: A vulnerability was reported in RSA Authentication Manager. REFERENCE LINKS: RSA SecurityTracker Alert ID: 1028638 CVE-2013-0947 IMPACT ASSESSMENT: Medium DISCUSSION: The system may write operating system, SNMP, and HTTP plug-in proxy passwords in clear text to log and configuration files. IMPACT: A local user can obtain operating system, SNMP, and HTTP plug-in proxy

469

Energy Management System Lowers U.S. Navy Energy Costs Through PV System Interconnection (Fact Sheet)  

SciTech Connect (OSTI)

To meet the U.S. Navy's energy goals, the National Renewable Energy Laboratory (NREL) and the Naval Facilities Engineering Command (NAVFAC) spent two years collaborating on demonstrations that tested market-ready energy efficiency measures, renewable energy generation, and energy systems integration. One such technology - an energy management system - was identified as a promising method for reducing energy use and costs, and can contribute to increasing energy security.

Not Available

2014-04-01T23:59:59.000Z

470

A system for collecting activity annotations for home energy management  

Science Journals Connector (OSTI)

Abstract Home energy management is becoming increasingly important and, though there are a plethora of tools for accessing energy consumption data, few provide concrete insights that can directly help users manage demand. Mechanisms that enable a user to draw connections between activities and energy consumption by attaching contextual labels to energy events are a promising step; however solutions for collecting annotations from users can be error prone or intrusive. This work presents a system for collecting in situ annotations using a smartphone application coupled with an off-the-shelf home energy measurement infrastructure. We use a novel power profiling approach to identify important energy consumption events and solicit contextual annotations from the user via a push notification sent to a smartphone. Using a five-week study performed in five homes, we show that our power profiling approach can identify a significant percentage of important energy consumption events using a very small number of monitored devices. We were able to collect an average of over 2 annotations per day and while users provided a wide range of annotations, the motivation to provide annotations varied across subjects.

Sami Rollins; Nilanjan Banerjee; Lazeeb Choudhury; David Lachut

2014-01-01T23:59:59.000Z

471

Program integration on the Civilian Radioactive Waste Management System  

SciTech Connect (OSTI)

The recent development and implementation of a revised Program Approach for the Civilian Radioactive Waste Management System (CRWMS) was accomplished in response to significant changes in the environment in which the program was being executed. The lack of an interim storage site, growing costs and schedule delays to accomplish the full Yucca Mountain site characterization plan, and the development and incorporation of a multi-purpose (storage, transport, and disposal) canister (MPC) into the CRWMS required a reexamination of Program plans and priorities. Dr. Daniel A. Dreyfus, the Director of the Office of Civilian Radioactive Waste Management (OCRWM), established top-level schedule, targets and cost goals and commissioned a Program-wide task force of DOE and contractor personnel to identify and evaluate alternatives to meet them. The evaluation of the suitability of Yucca Mountain site by 1998 and the repository license application data of 2001 were maintained and a target date of January 1998 for MPC availability was established. An increased multi-year funding profile was baselined and agreed to by Congress. A $1.3 billion reduction in Yucca Mountain site characterization costs was mandated to hold the cost to $5 billion. The replanning process superseded all previous budget allocations and focused on program requirements and their relative priorities within the cost profiles. This paper discusses the process for defining alternative scenarios to achieve the top-level program goals in an integrated fashion.

Trebules, V.B. [USDOE Office of Civilian Radioactive Waste Management, Washington, DC (United States). Program Management Div.; King, M.H. [TRW Environmental Safety Systems Inc., Vienna, VA (United States)

1995-09-01T23:59:59.000Z

472

EM Hosts Business Opportunity Forum | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

- 3:00pm Addthis EM Acquisition and Project Management Deputy Assistant Secretary Jack Surash speaks to participants of EM's Business Opportunity Forum. EM Acquisition and Project...

473

EM Launches Forum on Business Opportunities | Department of Energy  

Office of Environmental Management (EM)

Related Articles EM Acquisition and Project Management Deputy Assistant Secretary Jack Surash speaks to participants of EM's Business Opportunity Forum. EM Hosts Business...

474

EM SSAB Chairs Conference Calls | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EM SSAB Chairs Conference Calls EM SSAB Chairs Conference Calls January 31, 2008 EM SSAB Conference Calls - January 31, 2008 Minutes and highlights of the Environmental Management...

475

Stochastic Modeling of a Power-Managed System: Construction and Optimization Qinru Qiu, Qing Wu and Massoud Pedram  

E-Print Network [OSTI]

1 Stochastic Modeling of a Power-Managed System: Construction and Optimization Qinru Qiu, Qing Wu of a power-managed electronic system. We formulate the problem of system-level power management-digital components. Dynamic power management ­ which refers to selective shut-off or slow-down of system components

Qiu, Qinru

476

A decision support system for fisheries management using operations research and systems science approach  

Science Journals Connector (OSTI)

In this paper, we present a general framework, using a systems science approach, for developing a decision support system (DSS) for fisheries management. Decision support systems are quantitative tools for managers to evaluate outcomes of their policies prior to implementation. Our fishery model considers multiple stocks and fisheries simultaneously in balancing catch among targeted and protected fish abundances. Since in the Northeastern US multispecies fishery the distribution of abundance, catch-per-unit-effort and bycatch vary geographically, we focus on a spatial management approach to address their spatial variability. The core component of this DSS applies operations research techniques of simulation and optimization to determine the optimal inter-annual and intra-annual fishing plans in terms of fishing efforts in each sub-area and the time period. The result is the recommended amount to catch from each fish species at each sub-area at any time period so that while management objectives for sustainability of fish stocks are satisfied, the value of landings is maximized. The graphical user interface of the proposed DSS helps users to define inputs, to set constraints and sub-area boundaries, and to visualize the outcomes.

Farhad Azadivar; Tu Truong; Yue Jiao

2009-01-01T23:59:59.000Z

477

Thermal management of long-length HTS cable systems  

SciTech Connect (OSTI)

Projections of electric power production suggest a major shift to renewables, such as wind and solar, which will be in remote locations where massive quantities of power are available. One solution for transmitting this power over long distances to load centers is direct current (dc), high temperature superconducting (HTS) cables. Electric transmission via dc cables promises to be effective because of the low-loss, highcurrent- carrying capability of HTS wire at cryogenic temperatures. However, the thermal management system for the cable must be carefully designed to achieve reliable and energyefficient operation. Here we extend the analysis of a superconducting dc cable concept proposed by the Electric Power Research Institute (EPRI), which has one stream of liquid nitrogen flowing in a cryogenic enclosure that includes the power cable, and a separate return tube for the nitrogen. Refrigeration stations positioned every 10 to 20 km cool both nitrogen streams. Both go and return lines are contained in a single vacuum/cryogenic envelope. Other coolants, including gaseous helium and gaseous hydrogen, could provide potential advantages, though they bring some technical challenges to the operation of long-length HTS dc cable systems. A discussion of the heat produced in superconducting cables and a system to remove the heat are discussed. Also, an analysis of the use of various cryogenic fluids in long-distance HTS power cables is presented.

Demko, Jonathan A [ORNL; Hassenzahl, William V [ORNL

2011-01-01T23:59:59.000Z

478

Systems approaches to integrated solid waste management in developing countries  

Science Journals Connector (OSTI)

Solid waste management (SWM) has become an issue of increasing global concern as urban populations continue to rise and consumption patterns change. The health and environmental implications associated with SWM are mounting in urgency, particularly in the context of developing countries. While systems analyses largely targeting well-defined, engineered systems have been used to help SWM agencies in industrialized countries since the 1960s, collection and removal dominate the SWM sector in developing countries. This review contrasts the history and current paradigms of SWM practices and policies in industrialized countries with the current challenges and complexities faced in developing country SWM. In industrialized countries, public health, environment, resource scarcity, climate change, and public awareness and participation have acted as SWM drivers towards the current paradigm of integrated SWM. However, urbanization, inequality, and economic growth; cultural and socio-economic aspects; policy, governance, and institutional issues; and international influences have complicated SWM in developing countries. This has limited the applicability of approaches that were successful along the SWM development trajectories of industrialized countries. This review demonstrates the importance of founding new SWM approaches for developing country contexts in post-normal science and complex, adaptive systems thinking.

Rachael E. Marshall; Khosrow Farahbakhsh

2013-01-01T23:59:59.000Z

479

Federal Emergency Management Information System (FEMIS) System Administration Guide for FEMIS Version 1.4.6  

SciTech Connect (OSTI)

The Federal Emergency Management Information System (FEMIS) is an emergency management planning and response tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide provides information necessary for the system administrator to maintain the FEMIS system. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are corrected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via a Wide Area Network (WAN). Thus, FEMIS is an integrated software product that resides on client/server computer architecture. The main body of FEMIS software, referred to as the FEMIS Application Software, resides on the PC client(s) and is directly accessible to emergency management personnel. The remainder of the FEMIS software, referred to as the FEMIS Support Software, resides on the UNIX server. The Support Software provides the communication data distribution and notification functionality necessary to operate FEMIS in a networked, client/server environment.

Arp, J.A.; Bower, J.C.; Burnett, R.A.; Carter, R.J.; Downing, T.R.; Fangman, P.M.; Gerhardstein, L.H.; Homer, B.J.; Johnson, D.M.; Johnson, R.L.; Johnson, S.M.; Loveall, R.M.; Martin, T.J.; Millard, W.D.; Schulze, S.A.; Stoops, L.R.; Tzemos, S.; Wood, B.M.

1999-06-29T23:59:59.000Z

480

Energy Management System for an Hybrid Electric Vehicle, Using Ultracapacitors and Neural Networks  

E-Print Network [OSTI]

Energy Management System for an Hybrid Electric Vehicle, Using Ultracapacitors and Neural Networks management system for hybrid electric vehicles (HEV), using neural networks (NN), was developed and tested. The system minimizes the energy requirement of the vehicle and can work with different primary power sources

Catholic University of Chile (Universidad Católica de Chile)

Note: This page contains sample records for the topic "management system ems" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Aeronautical System Center's environmental compliance assessment and management program's cost-saving initiatives support the Air Force's acquisition reform initiative  

SciTech Connect (OSTI)

The Environmental Management directorate of ASC (ASC/EM) has the responsibility of providing government oversight for the Government Owned Contractor Operated Aircraft and Missile plants (GOCOs). This oversight is manifested as a landlord role where Air Force provides the funding required to maintain the plant facilities including buildings and utilities as well as environmental systems. By agreement the companies operating the plants are required to operate them in accordance with environmental law. Presently the GOCOs include Air Force Plant (AFP) 6 in Marietta Ga., AFP 4 in Fort Worth, Tx., AFP 44 in Tucson, Az., AFP 42 in Palmdale, Ca., and AFP PJKS in Denver, Co. Lockheed Martin corporation operates AFPs 4,6, PJKS and a portion of AFP 42 while AFP 44 is operated by Raytheon Missile Systems Company. Other GOCOs at AFP 42 are Northrup-Grumman, Boeing, and Cabaco, the facilities engineer. Since 1992 the Environmental Management division has conducted its Environmental Compliance Assessment and Management Program assessments (ECAMP) annually at each of the plants. Using DOD's ECAMP Team Guide and teams comprised of both Air Force and consultant engineering personnel, each plant is assessed for its environmental compliance well being. In the face of rising operational costs and diminishing budgets ASC/EM performed a comprehensive review of its ECAMP. As a result, the basic ECAMP program was improved to reduce costs without compromising on quality of the effort. The program retained its emphasis in providing a snap-shot evaluation of each Air Force plant's environmental compliance health supported by complete but tailored protocol assessments.

Meanor, T.

1999-07-01T23:59:59.000Z

482

A framework for an innovative knowledge management system in knowlegde-based firms.  

E-Print Network [OSTI]

??This study examined how a knowledge management system can bring innovative behaviour to a knowledge based firm. The study developed a framework for such a… (more)

Lindner, Eli

2014-01-01T23:59:59.000Z

483

Second law analysis of a liquid cooled battery thermal management system for hybrid and electric vehicles.  

E-Print Network [OSTI]

??As hybrid and electric vehicles continue to evolve there is a need for better battery thermal management systems (BTMS), which maintain uniformity of operating temperature… (more)

Ramotar, Lokendra

2010-01-01T23:59:59.000Z

484

Design and Implementation of Operation Energy Management System Based on AJAX-SSH2  

Science Journals Connector (OSTI)

With the development of communication network construction, the operation consumption of communications industry grows significantly in ... Therefore, it is necessary to develop an operation energy management system

Ye Yuan; Ke-Bin Jia…

2014-01-01T23:59:59.000Z

485

School of Environmental & Biological Sciences 11:709:349-Management of Foodservice Systems  

E-Print Network [OSTI]

1/23 Foodservice Management, let's review what we know Text Ch 1 & 2 Class Discussion-Checklists Get into groups 1/28 Management of Foodservice Systems; Regulatory environment. A little history More Culinary/8) 4/10, 4/15 Management Functions 4/17, 4/22, 4/24, 4/29 (Marketing plan, Employee Schedules

Chen, Kuang-Yu

486

1236 Plant Disease / Vol. 96 No. 9 A Systems Approach for Management  

E-Print Network [OSTI]

1236 Plant Disease / Vol. 96 No. 9 A Systems Approach for Management of Pests and Pathogens, recognized, and managed using pest management tools and approaches that often differ among plant taxa of Nursery Crops Jennifer L. Parke Department of Crop and Soil Science & Department of Botany and Plant

Grünwald, Niklaus J.

487

International Summer School 2013 Ecological Management in the Man -Environment System  

E-Print Network [OSTI]

International Summer School 2013 Ecological Management in the «Man - Environment» System 16 of the Environment, Geography, Environmental Management, Geo-ecology, Land-use Planning or Environmental Planning pollution. Thus, an effective environmental management is vitally important for sustainable development

Greifswald, Ernst-Moritz-Arndt-Universität

488

Qualitative Analysis of Semantically Enabled Knowledge Management Systems in Agile Software Engineering  

Science Journals Connector (OSTI)

In many agile software engineering organizations there is not enough time to follow knowledge management processes, to retrieve knowledge in complex processes, or to systematically elicit knowledge. This chapter gives an overview about the human-centered ... Keywords: Agile Software Engineering, Experience Management, Human-centered Design, Riki, Semantic Wiki, Semantically Enabled Knowledge Management Systems, Software Reuse, Wiki

Jörg Rech, Christian Bogner

2010-04-01T23:59:59.000Z

489

CropIrri: A DECISION SUPPORT SYSTEM FOR CROP IRRIGATION MANAGEMENT  

E-Print Network [OSTI]

: A field crop irrigation management decision-making system (CropIrri) was developed based on the soil water management model. The irrigation plan is made through predicating of soil water content in root zone-sowing and real-time irrigation management decision-making support, simulation of soil water dynamics in the root

490

Human-System Safety Methods for Development of Advanced Air Traffic Management Systems  

SciTech Connect (OSTI)

The Idaho National Engineering and Environmental Laboratory (INEEL) is supporting the National Aeronautics and Space Administration in the development of advanced air traffic management (ATM) systems as part of the Advanced Air Transportation Technologies program. As part of this program INEEL conducted a survey of human-system safety methods that have been applied to complex technical systems, to identify lessons learned from these applications and provide recommendations for the development of advanced ATM systems. The domains that were surveyed included offshore oil and gas, commercial nuclear power, commercial aviation, and military. The survey showed that widely different approaches are used in these industries, and that the methods used range from very high-level, qualitative approaches to very detailed quantitative methods such as human reliability analysis (HRA) and probabilistic safety assessment (PSA). In addition, the industries varied widely in how effectively they incorporate human-system safety assessment in the design, development, and testing of complex technical systems. In spite of the lack of uniformity in the approaches and methods used, it was found that methods are available that can be combined and adapted to support the development of advanced air traffic management systems.

Nelson, W.R.

1999-05-24T23:59:59.000Z

491

T-606: Sun Java System Access Manager Lets Remote Users Partially Modify  

Broader source: Energy.gov (indexed) [DOE]

06: Sun Java System Access Manager Lets Remote Users Partially 06: Sun Java System Access Manager Lets Remote Users Partially Modify Data and Remote Authenticated Users Partially Access Data T-606: Sun Java System Access Manager Lets Remote Users Partially Modify Data and Remote Authenticated Users Partially Access Data April 20, 2011 - 3:58am Addthis PROBLEM: Two vulnerabilities were reported in Sun Java System Access Manager. A remote authenticated user can partially access data on the target system. A remote user can partially modify data on the target system. PLATFORM: Sun Java versions 7.1, 8.0 ABSTRACT: Sun Java System Access Manager Lets Remote Users Partially Modify Data and Remote Authenticated Users Partially Access Data. reference LINKS: SecurityTracker Alert ID: 1025408 CVE-2011-0844 CVE-2011-0847 Oracle Critical Patch Update Advisory

492

Tank waste remediation system privatization infrastructure program, configuration management implementation plan  

SciTech Connect (OSTI)

This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

Schaus, P.S.

1998-08-18T23:59:59.000Z

493

Activity-based knowledge contexts : an exploration of Niklas Luhmann's autopoietic social theories for knowledge management practice and systems.  

E-Print Network [OSTI]

??[Truncated abstract] The dominant approaches to knowledge management practice and the design of knowledge management systems are driven by a resource-based view of knowledge. In… (more)

Young, Regit

2006-01-01T23:59:59.000Z

494

Selenium Speciation and Management in Wet FGD Systems  

SciTech Connect (OSTI)

This report discusses results from bench- and pilot-scale simulation tests conducted to determine the factors that impact selenium speciation and phase partitioning in wet FGD systems. The selenium chemistry in wet FGD systems is highly complex and not completely understood, thus extrapolation and scale-up of these results may be uncertain. Control of operating parameters and application of scrubber additives have successfully demonstrated the avoidance or decrease of selenite oxidation at the bench and pilot scale. Ongoing efforts to improve sample handling methods for selenium speciation measurements are also discussed. Bench-scale scrubber tests explored the impacts of oxidation air rate, trace metals, scrubber additives, and natural limestone on selenium speciation in synthetic and field-generated full-scale FGD liquors. The presence and concentration of redox-active chemical species as well as the oxidation air rate contribute to the oxidation-reduction potential (ORP) conditions in FGD scrubbers. Selenite oxidation to the undesirable selenate form increases with increasing ORP conditions, and decreases with decreasing ORP conditions. Solid-phase manganese [Mn(IV)] appeared to be the significant metal impacting the oxidation of selenite to selenate. Scrubber additives were tested for their ability to inhibit selenite oxidation. Although dibasic acid and other scrubber additives showed promise in early clear liquor (sodium based and without calcium solids) bench-scale tests, these additives did not show strong inhibition of selenite oxidation in tests with higher manganese concentrations and with slurries from full-scale wet FGD systems. In bench-tests with field liquors, addition of ferric chloride at a 250:1 iron-to-selenium mass ratio sorbed all incoming selenite to the solid phase, although addition of ferric salts had no impact on native selenate that already existed in the field slurry liquor sample. As ORP increases, selenite may oxidize to selenate more rapidly than it sorbs to ferric solids. Though it was not possible to demonstrate a decrease in selenium concentrations to levels below the project�¢����s target of 50 ���µg/L during pilot testing, some trends observed in bench-scale testing were evident at the pilot scale. Specifically, reducing oxidation air rate and ORP tends to either retain selenium as selenite in the liquor or shift selenium phase partitioning to the solid phase. Oxidation air flow rate control may be one option for managing selenium behavior in FGD scrubbers. Units that cycle load widely may find it more difficult to impact ORP conditions with oxidation air flow rate control alone. Because decreasing oxidation air rates to the reaction tank showed that all �¢����new�¢��� selenium reported to the solids, the addition of ferric chloride to the pilot scrubber could not show further improvements in selenium behavior. Ferric chloride addition did shift mercury to the slurry solids, specifically to the fine particles. Several competing pathways may govern the reporting of selenium to the slurry solids: co-precipitation with gypsum into the bulk solids and sorption or co-precipitation with iron into the fine particles. Simultaneous measurement of selenium and mercury behavior suggests a holistic management strategy is best to optimize the fate of both of these elements in FGD waters. Work conducted under this project evaluated sample handling and analytical methods for selenium speciation in FGD waters. Three analytical techniques and several preservation methods were employed. Measurements of selenium speciation over time indicated that for accurate selenium speciation, it is best to conduct measurements on unpreserved, filtered samples as soon after sampling as possible. The capital and operating costs for two selenium management strategies were considered: ferric chloride addition and oxidation air flow rate control. For ferric chloride addition, as migh

Searcy, K.; Richardson, M.; Blythe, G.; Wallschlaeger, D.; Chu, P.; Dene, C.

2012-02-29T23:59:59.000Z

495

Integrated Safety Management Policy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Integrated Integrated Safety Management Policy Integrated Safety Management Policy This Integrated Safety Management (ISM) System Description (ISMSD) defines how the U.S. Department of Energy (DOE) Office of Environmental Management (EM) integrates environment, safety, and health requirements and controls into Federal work activities, and oversees implementation of ISM within EM federal and contractor activities. It explains our safety values, objectives and approach for ensuring protection to the public, worker and the environment, consistent with DOE Policy 450.4, Safety Management System Policy. The ISMSD describes how EM conducts work following the seven ISM Guiding Principles, the five ISM core functions, and also incorporates the four supplemental safety culture elements from DOE Implementation Plan to

496

EM Current Project Performance  

Broader source: Energy.gov [DOE]

In the spirit of promoting transparency with stakeholders and the public, the Office of Environmental Management (EM) posts key project management information on its website. This document provides...

497

Order Module--DOE O 151.1C, COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM |  

Broader source: Energy.gov (indexed) [DOE]

151.1C, COMPREHENSIVE EMERGENCY MANAGEMENT 151.1C, COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM Order Module--DOE O 151.1C, COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM The familiar level of this module is designed to summarize the basic information in DOE O 151.1C, Comprehensive Emergency Management System. This module is divided into two sections. in the first section, we will discuss the objectives and responsibilities of DOE O 151.1C, Comprehensive Emergency Management System. In the second section, we will discuss the requirements included in chapters III through XI in the Order. The information provided will meet the relevant requirements in the following DOE Functional Area Qualification Standards: DOE-STD-1177-2004, Emergency Management DOE-STD-1151-2002, Facility Representative DOE-STD-1137-2007, Fire Protection Engineering

498

Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan  

SciTech Connect (OSTI)

This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.

Burgard, K.G.

1998-09-24T23:59:59.000Z

499

CS 525: Advanced Database Organization Study of relational, semantic, and object-oriented data models and interfaces. Database management system  

E-Print Network [OSTI]

History of database management. Goals of database system development. Relational systems Data modelsCS 525: Advanced Database Organization Objectives Study of relational, semantic, and object-oriented data models and interfaces. Database management system techniques for query optimization, concurrency

Heller, Barbara

500

NREL: Energy Systems Integration - Power Grid Data Management...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Grid Data Management and Analysis In this seminar, Terence Critchlow talks about ongoing projects at Pacific Northwest National Laboratory (PNNL) that demonstrate use of a...