Powered by Deep Web Technologies
Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Strategic Plan Recreation Management  

E-Print Network (OSTI)

Strategic Plan Recreation Management Department Brigham Young University 2013 #12;Vision We strive in meaningful recreational experiences. Core Values We value the role wholesome recreation plays in the well strive to make meaningful contributions to both recreation related research and practice. Department

Olsen Jr., Dan R.

2

Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Plan science-innovationassetsimagesicon-science.jpg Strategic Plan x Strategic Plan Los Alamos National Laboratory Strategic Plan - 2014 (pdf) Our Strategic Plan...

3

Strategic Planning System for Exotic Game Management  

E-Print Network (OSTI)

. Jerry Stuth The paradigm of indiscriminate introduction of exotic ungulates has escalated the need for ecological and biological understanding of nonindigenous species. Management of any species or animal enterprise is a dynamic process..., and requires ecological considerations as well as economic constraints. The initial framework of Strategic Planning System for Exotic Game (SPSEG) may allow proactive management of animal enterprises and help mediate the often conflicting short term needs...

Lubbering, Jeanne Marie Petrofes

2012-06-07T23:59:59.000Z

4

Strategic Energy Management Plan for the 1990's  

E-Print Network (OSTI)

This paper describes the strategic energy management plan implemented by the Defense Systems and Electronics Group (DSEG) of Texas Instruments (TI) to enable it to meet its energy management challenge into the 1990's. The strategic energy management...

Fiorino, D. P.; Priest, J. W.

1987-01-01T23:59:59.000Z

5

Industrial Engineering & ManagementStrategic Plan 2014-2018  

E-Print Network (OSTI)

Industrial Engineering & ManagementStrategic Plan 2014-2018 College of Engineering, Architecture & Technology #12;Strategic Plan 2014-2018 Industrial Engineering and Management at Oklahoma State University and first Ph.D. in 1960. This School has been represented and led by giants in Industrial Engineering

Piao, Daqing

6

STRATEGIC PLAN  

Energy Savers (EERE)

STRATEGIC PLAN 2015 - 2018 Message from the Associate Under Secretary for Environment, Health, Safety and Security I am proud to introduce this strategic plan for the Office of...

7

Rangeland Resource Management for Texans: Strategic Planning for Success  

E-Print Network (OSTI)

For the rangeland manager, strategic planning begins with defining the mission. Then it is important to set goals that are realistic in light of the internal and external environments in which the business operates. This publication can help...

Fox, William E.

2002-03-04T23:59:59.000Z

8

Managing the Transition State for Energy Strategic Planning  

E-Print Network (OSTI)

MANAGING THE TRANSITION STATE FOR ENERGY STRATEGIC PLANNING a Thomas A. Koehler Eastman Kodak Company Rochester, New York ABSTRACT Corporate energy conservation programs have made substantial gains in reducing energy consumption during... the last decade. The responses to survive the mid-1970's global energy uncertainties were made in a crisis environment. Now, there is a transition from energy conservation to energy strategic planning. Energy engineers and managers need to im prove...

Koehler, T. A.

9

Information Resources Management Strategic Plan Appendix FY2014...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE IRM Strategic Plan outlines DOE's approach to maturing its IT portfolio with a service oriented approach. The following IRM Objective supports Requirement HXXA: 1.2 Create...

10

Report: EM Strategic Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STRATEGIC PLANNING STRATEGIC PLANNING September 25, 2008 Submitted by the EMAB Strategic Planning Subcommittee Background In Fiscal Year (FY) 2008, the Environmental Management Advisory Board (EMAB) was tasked to assess EM's strategic planning capabilities/processes and, in particular, to review the status of the initiatives pursued by the Office of Strategic Planning and Analysis (EM-32). This charge was derived from the Board's work pertaining to the topics of Discretionary Budgeting and Technical Uncertainty and Risk Reduction, which were addressed in previous reports and recommendations to the Assistant Secretary. The EMAB Strategic Planning Committee was formed to expand on this earlier work and pursue dialogues with the EM Office of Program Planning and Budget (EM-30) in

11

Strategic Energy Management Plan For Fort Buchanan, Puerto Rico  

SciTech Connect

This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Strategic Energy Management Plan for the Site. A strategy has been developed with three major elements in mind: 1) development of a strong foundation from which to build, 2) understanding technologies that are available, and 3) exploring financing options to fund the implementation of improvements. The objective of this report is to outline a strategy that can be used by Fort Buchanan to further establish an effective energy management program. Once a strategy is accepted, the next step is to take action. Some of the strategies defined in this Plan may be implemented directly. Other strategies may require the development of a more sophisticated tactical, or operational, plan to detail a roadmap that will lead to successful realization of the goal. Similarly, some strategies are not single events. Rather, some strategies will require continuous efforts to maintain diligence or to change the culture of the Base occupants and their efforts to conserve energy resources.

Parker, Steven A.; Hunt, W. D.

2001-10-31T23:59:59.000Z

12

GHG and Carbon Emissions Management Strategic Planning Too聝  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Strategic Planning Tools - Localized Strategic Planning For The U.S. Department of Energy National Energy Technology Laboratory Under Contract Number: DE-AM-26-99FT40465 Task 50113, Subtask 3 Augusta Systems Report Number: AS-NETL-50113-3-FR December 31, 2002 DISCLAIMER AND ACKNOWLEDGEMENTS Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial

13

Automated Home Energy Management (AHEM) Standing Technical Committee Strategic Plan - February 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Automated Home Energy Management (AHEM) Automated Home Energy Management (AHEM) Standing Technical Committee Strategic Plan, v2011c - February 2012 Committee Chair: 2011 Kurt Roth Fraunhofer 2012 Lieko Earle, Bethany Sparn NREL 2 Prioritization of Gaps, Barriers and Needs The following table lists a prioritization for the Gaps, Barriers and Needs included in the Building America AHEM STC Strategic Plan. Table 1. Gaps and Barriers for AHEM STC. Rank Description 1 Energy Savings / ROI Insufficiently Quantified 2 Lack of Consumer Awareness of AHEM Products 3 Low Interest in Managing Energy Use 4 Complexity of AHEM Products Contents Summary of AHEM STC Strategic Plan ..................................................................................................................... 3

14

2006 Department of Energy Strategic Plan - Linking Strategic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

meeting annual performance metrics. The data is then consolidated for senior management review. 2006 Department of Energy Strategic Plan - Linking Strategic Goals to Annual...

15

Strategic Plans | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Plans Strategic Plans Strategic Plans September 20, 2013 DOE OIG Strategic Plan Fiscal Years 2014 - 2019 The Office of Inspector General's plan to strengthen the integrity, economy, and efficiency of the Department's programs and operations. December 31, 2007 DOE OIG Strategic Plan Fiscal Years 2009 - 2013 This Strategic Plan offers a glance at the Office of the Inspector General's long term effort to work with the Department of Energy's leadership to improve the management and performance of the Department's programs and operations. December 31, 2002 DOE OIG Strategic Plan Fiscal Years 2003-2008 This plan represents the Office of the Inspector General's vision and strong commitment for improving the management and performance of the Department of Energy's many programs and operations

16

2006 Department of Energy Strategic Plan - Linking Strategic Goals to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2006 Department of Energy Strategic Plan - Linking Strategic Goals 2006 Department of Energy Strategic Plan - Linking Strategic Goals to Annual Performance Goals 2006 Department of Energy Strategic Plan - Linking Strategic Goals to Annual Performance Goals Section 10 of the U.S. Department of Energy's Strategic Plan discusses Linking Strategic Goals to Annual Performance Goals through Program Assessment. DOE uses a variety of methods and tools to assess its programs. Internally, programs are required to report quarterly on their progress in meeting annual performance metrics. The data is then consolidated for senior management review. 2006 Department of Energy Strategic Plan - Linking Strategic Goals to Annual Performance Goals More Documents & Publications 2006 Department of Energy Strategic Plan U.S Department of Energy Strategic Plan

17

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

18

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

19

GHG and Carbon Emissions Management Strategic Planning Too聝  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Planning Tools For The U.S. Department of Energy National Energy Technology Laboratory Under Contract Number: DE-AM-26-99FT40465 Task 50113, Subtask 3 Augusta Systems Report Number: AS-NETL-50113-3-FR December 31, 2002 DISCLAIMER AND ACKNOWLEDGEMENTS Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial

20

2013 Strategic Sustainability Performance Plan  

Office of Energy Efficiency and Renewable Energy (EERE)

2013 Strategic Sustainability Performance Plan, a report to the White House Council on Environmental Quality and Office of Management and Budget, June 2013, by the U.S. Department of Energy.

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

2012 DOE Strategic Sustainability Performance Plan | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Strategic Sustainability Performance Plan 2012 DOE Strategic Sustainability Performance Plan The 2012 DOE Strategic Sustainability Performance Plan embodies DOE's...

22

Strategic Plan: 2014 - 2018  

Annual Energy Outlook 2012 (EIA)

marketplace to an expanding customer base. EIA's program directly supports Goal 1 (Science and Energy) of DOE's 2014 Strategic Plan. Specifically, EIA has identified four...

23

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

24

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

25

State Energy Strategic Planning  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

26

Strategic Energy Planning Process  

Energy.gov (U.S. Department of Energy (DOE))

The nine-step process for community strategic energy planning helps Tribes establish a comprehensive understanding of current energy use and costs, get insight into efficiency and conservation...

27

2007 Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy Office of Legacy Management Office of Legacy Management Strategic Plan O r g a n i z a t i o n O r g a n i z a t i o n A H i g h Perfo r m i n g A H i g h Perfo r m i n g HPO Managing Today's Change, Protecting Tomorrow's Future Managing Today's Change, Protecting Tomorrow's Future DOE/LM-1458 Cover, left to right, top to bottom: The Environmental Justice program affords learning opportunities for interns at an U.S. Department of Energy national laboratory. A records storage facility at the Mound, Ohio, site. A c The Weldon Spring, Missouri, Site disposal cell shown with its prairie in bloom. Tours of the disposal cell and Interpretive Center are available for school children and other groups. Environmental Sciences Laboratory personnel conduct projects in applied science that help ensure that Legacy Management remediation

28

Strategic planning for disaster relief logistics: lessons from supply chain management  

Science Journals Connector (OSTI)

Management of disaster relief logistics requires different techniques at different levels. We identify four stages: 1 strategic planning which concerns high level decisions such as supplier selection and confirmation of communication protocols; 2 preparedness which concerns decisions regarding the amount and location of relief supplies to be stored; 3 pre-event response which concerns decisions during those occasions when an approaching disaster, such as a hurricane, has been detected; 4 post-event response which concerns what needs to be done immediately after a disaster has occurred. In this article, we concentrate on the strategic planning stage and build an integrated logistics model based on elements of supply chain management theory. This model provides specific recommendations to practitioners and identifies important areas to be researched. We also point out the applicable techniques at each of the other stages and cite relevant literature.

Nezih Altay; Sameer Prasad; Jayavel Sounderpandian

2009-01-01T23:59:59.000Z

29

2004 Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Legacy Management Legacy Management STRATEGIC PLAN "Managing Today's Change, Protecting Tomorrow's Future" July 2004 ii July 2004 Executive Summary Activities of the U.S. Department of Energy (the Department) and predecessor agencies, particularly during the Cold War, have left a legacy of environmental impact at over 100 sites. Workers associated with these historical and current activities number in the hundreds of thousands. Addressing this environmental and human legacy has been, and will continue to be, a major Departmental undertaking. On December 15, 2003, the Department took a significant step toward managing post-closure activities so as to ensure the future protection of human health and the environment by creating the Office of

30

DOE/NNSA Strategic Performance Evaluation Plan (PEP) FOR MANAGEMENT...  

National Nuclear Security Administration (NNSA)

Services Pantex, LLC Contract Number: DE-AC54-00AL66620 Performance period: October 01, 2013 through September 30, 2014 J D. Woolery P e dent and General Manager B cock & Wilcox...

31

Building Technologies Office: Strategic Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Plans to Strategic Plans to someone by E-mail Share Building Technologies Office: Strategic Plans on Facebook Tweet about Building Technologies Office: Strategic Plans on Twitter Bookmark Building Technologies Office: Strategic Plans on Google Bookmark Building Technologies Office: Strategic Plans on Delicious Rank Building Technologies Office: Strategic Plans on Digg Find More places to share Building Technologies Office: Strategic Plans on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Solar Decathlon Building America Research Innovations Research Tools Building Science Education Climate-Specific Guidance Solution Center Partnerships Meetings Publications Home Energy Score Home Performance with ENERGY STAR Better Buildings Neighborhood Program Challenge Home

32

2014- 2018 Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE))

In April 2014, The Department of Energy released its 2014 - 2018 strategic plan, a comprehensive blueprint to guide the agency's core mission of ensuring America's security and prosperity by...

33

2010 DOE Strategic Sustainability Performance Plan - Report to...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 DOE Strategic Sustainability Performance Plan - Report to the White House Council on Environmental Quality and Office of Management and Budget 2010 DOE Strategic Sustainability...

34

Policy & Strategic Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory Directed R&D Laboratory Directed R&D Office of Technology Commercialization and Partnerships Other Information BNL Site Index Can't View PDFs? Policy & Strategic Planning Directorate Policy and Strategic Planning (P&SP) Directorate coordinates development of the Laboratory Strategic Plan and annual business plans at the institutional and organizational Level. This function includes administration of the Laboratory Directed Research and Development (LDRD) program. The Directorate is also responsible for the Laboratory's technology transfer functions, including collaborations with industry and work for others; and for increasing funding from sources other than DOE. Organization Chart (pdf) Top of Page Last Modified: June 4, 2013 Please forward all questions about this site to: Teresa Baker

35

EMSL Strategic Plan 2008  

SciTech Connect

This Strategic Plan is EMSL抯 template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE抯 Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

Campbell, Allison A.

2008-08-15T23:59:59.000Z

36

2014 DOE Strategic Sustainability Performance Plan | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2014 DOE Strategic Sustainability Performance Plan 2014 DOE Strategic Sustainability Performance Plan In the 2014 DOE Strategic Sustainability Performance Plan, DOE pledges to...

37

EMSL Strategic Plan 2008  

NLE Websites -- All DOE Office Websites (Extended Search)

7753 7753 EMSL Strategic Plan 2008 AA Campbell August 2008 Prepared for the U.S. Department of Energy's Office of Biological and Environmental Research under Contract DE-AC05-76RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 iii Environmental Molecular Sciences Laboratory Strategic Plan Our Mission EMSL, a U.S. Department of Energy national scientific user facility located at Pacific Northwest National Laboratory, provides integrated experimental and computational resources for discovery and technological innovation in the environmental molecular

38

Strategic Energy Management and Continuous Improvement Resouces  

Energy.gov (U.S. Department of Energy (DOE))

A successful strategic energy management plan sets goals, tracks progress, and reports results while building long-term relationships with energy users and targeting persistent energy savings.

39

2011 Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE))

In May 2011, The Department of Energy today released its 2011 strategic plan, a comprehensive blueprint to guide the agency's core mission of ensuring America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions.

40

Strategic Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Plans Strategic Plans Strategic Plans The strategic planning process charts the course for the U.S. Department of Energy (DOE) Building America program's efforts to widely deploy new integrated packages of energy-saving measures in new and existing homes. These living documents give an overview of Building America's research approach to evaluate specific building system options for reliability, cost-effectiveness, and marketability. Here you can learn more by reading strategic planning reports for specific research areas. Standing Technical Committees The Building America program actively engages all relevant industry stakeholders in the research planning process, primarily through Standing Technical Committees (STCs). STCs focus on identifying and resolving key

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Report: Strategic Planning Impacts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Planning Impacts Strategic Planning Impacts September 30, 2009 Submitted by the EMAB ARRA Implementation and Oversight Subcommittee Background: EM plans to use the influx of stimulus funding from the American Recovery and Reinvestment Act (ARRA) to fulfill compliance agreements, complete construction projects, and address the program's lower-tier activities such as decontamination and decommissioning (D&D) and soil and groundwater remediation. Using the ARRA funds to reduce the physical size of the EM complex will also help to lower overall lifecycle costs, create jobs, and allow the program to capitalize on its past successes. Implementation of ARRA is a high-visibility endeavor that has the potential to impact the EM base program's day-to-day operations and processes.

42

Management Plan Management Plan  

E-Print Network (OSTI)

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP颅 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

43

Strategic Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

44

CORPORATE AND STRATEGIC PLANNING Faculty planning workbook  

E-Print Network (OSTI)

.............................................................................33 Staffing & workforce planningCORPORATE AND STRATEGIC PLANNING Faculty planning workbook Humanities, Law & Social Studies Outcomes from 2008/09 Confirmation of progress during 2009/10 Faculty planning for 2010/11 颅 2012/13 #12

45

Strategic Plan 2007 - Making Today's Change, Protecting Tomorrow's Future |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Plan 2007 - Making Today's Change, Protecting Tomorrow's Strategic Plan 2007 - Making Today's Change, Protecting Tomorrow's Future Strategic Plan 2007 - Making Today's Change, Protecting Tomorrow's Future The Office of Legacy Management's (LM) Strategic Plan explains the Office's responsibilities and outlines a comprehensive management plan extending out to the year 2020 for all legacy issues. The goals, strategies, and performance measures presented here define the indicators of progress towards our vision of a Department that meets our legal, regulatory, and contractual commitments to other federal, state, and local government agencies, public interest or community groups, and individuals. 2007 Strategic Plan More Documents & Publications Stategic Plan 2004 - Making Today's Change, Protecting Tomorrow's Future

46

Strategic Plan 2007 - Making Today's Change, Protecting Tomorrow's Future |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Plan 2007 - Making Today's Change, Protecting Tomorrow's Strategic Plan 2007 - Making Today's Change, Protecting Tomorrow's Future Strategic Plan 2007 - Making Today's Change, Protecting Tomorrow's Future The Office of Legacy Management's (LM) Strategic Plan explains the Office's responsibilities and outlines a comprehensive management plan extending out to the year 2020 for all legacy issues. The goals, strategies, and performance measures presented here define the indicators of progress towards our vision of a Department that meets our legal, regulatory, and contractual commitments to other federal, state, and local government agencies, public interest or community groups, and individuals. 2007 Strategic Plan More Documents & Publications Stategic Plan 2004 - Making Today's Change, Protecting Tomorrow's Future

47

Strategic Energy Management  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) See Action Network and Weatherization and Intergovernmental Program Technical Assistance Program sponsored this webinar about strategic management in the public sector on November 7, 2012.

48

State Energy Program Strategic Plan: February 2007  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

State Energy Program Strategic Plan )HEUXDU SEP Strategic Plan February 2007 TABLE OF CONTENTS Foreword iii Mission and Operations 1 Current Energy Trends 1 Key Drivers 3 Setting...

49

DOE OIG Strategic Plan pages.qxd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Message from the Inspector General Message from the Inspector General I am pleased to present the Office of Inspector General's Strategic Plan covering Fiscal Years 2009-2013. The Strategic Plan offers a glance at our long term effort to work with the Department of Energy's leadership to improve the management and performance of the Department's programs and operations. As we implement this Strategic Plan, our objective is to continue to play a critical role in protecting and preserving the Department's assets and resources. We will focus on mitigating those management challenges facing the Department through continued collaboration and cooperation with the Secretary and Department senior management. An equally important goal is aggressively exercising our statutory law enforcement authority

50

International Facility Management Association Strategic Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Management Association Facility Management Association Strategic Facility Planning: A WhIte PAPer Strategic Facility Planning: A White Paper on Strategic Facility Planning 漏 2009 | International Facility Management Association For additional information, contact: 1 e. Greenway Plaza, Suite 1100 houston, tX 77046-0104 USA P: + 1-713-623-4362 F: + 1-713-623-6124 www.ifma.org taBle OF cOntentS PreFace ......................................................... 2 executive Summary .................................... 3 Overview ....................................................... 4 DeFinitiOn OF Strategic Facility Planning within the Overall cOntext OF Facility Planning ................. 5 SPecializeD analySeS ................................ 9 OrganizatiOnal aPPrOacheS tO SFP ... 10 the SFP PrOceSS .......................................

51

EM International Strategic Plan 2010-2015  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

InternatIonal Program StrategIc Plan 2010-2015 InternatIonal Program StrategIc Plan 2010-2015 Message from the Director Our International Program links the DOE Office of Environmental Management (EM) to the world's evolving environmental remediation and radioactive waste management practices. The EM International Program develops formal relationships with multilateral international organizations as well as organizations within individual nations that enable exchange of scientific and technical information and collabora- tive activities. Further, the International Program fosters communica- tion and discovery globally of emergent technologies. Participation in these activities benefits EM through the acquisition and pooling of information, particularly related to complex issues, which have the potential of leading to transformational solutions to

52

Strategic Energy Management Plan: General Services Administration, Region 10, Northwest/Arctic Region  

NLE Websites -- All DOE Office Websites (Extended Search)

the mission of the General Services the mission of the General Services Administration is to help federal agencies better serve the public by offering, at best value, superior workplaces and expert solutions, acquisition services, and management policies. our vision as staff of GSA's Northwest/Arctic Region is to serve as strategic real estate advisors who provide superior, sustainable workspace solutions that exceed customer expectations, enhance worker productivity, and reflect our understanding of client needs while providing environmental leadership within the communities we serve. our core values are "SAIL ON" which stands for Support, Accountability, Integrity, Loyalty and trust, Ownership/commitment, and Nurture a fun workplace. i table of contents

53

Strategic Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Plan Strategic Plan Strategic Plan Strategic Plan A modern, reliable, secure, affordable and environmentally sensitive national energy infrastructure is fundamental to our quality of life and energy future. Yet since 1982, growth in peak demand for electricity has exceeded the growth and development of our electric grid. This demand growth will continue due to a growing population; larger homes with burgeoning IT requirements and more elaborate appliances; and the growth of electric vehicles; as well as, the day-to-day energy required to power our hospitals, schools, industries and other necessities of life. The electricity we use today is delivered via an electric infrastructure built with 19th and 20th century technologies which are inadequate to keep pace

54

Light Sources Directorate Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Light Sources Directorate Light Sources Directorate Strategic Plan December 2009 Light Sources Directorate Strategic Plan December 2009 ii | Vision and Mission Light Sources Directorate Strategic Plan The VISION of the Light Sources Directorate is: to be a provider of choice for world-class photon science and facilities that deliver outstanding scientific productivity and impact, and to be recognized as a leader in developing innovative techniques and ap- plications of photon science Our MISSION is defined by the set of activities that are required to realize this vision: to advance scientific knowledge and to solve critical problems through the design, construction, operation, and use of premier photon science facilities | Table of Contents Light Sources Directorate Strategic Plan

55

Academic Testing Services STRATEGIC PLAN  

E-Print Network (OSTI)

Academic Testing Services STRATEGIC PLAN 2009 MISSION STATEMENT Academic Testing Services provides proctored testing services administered in a secure and appropriate standardized testing environment. VISION STATEMENT Academic Testing Services will provide quality services that are integral to recruitment

Rock, Chris

56

Strategic Energy Planning Webinar Presentation Slides  

Energy.gov (U.S. Department of Energy (DOE))

Download presentation slides from the DOE Office of Indian Energy webinar on strategic energy planning.

57

OCIO Strategic Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

OCIO Strategic Plan OCIO Strategic Plan OCIO Strategic Plan The mission of the Office of the Chief Information Officer (OCIO) is to enable the Department of Energy's urgent missions in energy, science and nuclear security through the power of information and technology in a manner that balances risk with required outcomes in programs that span from open science to national security. DOE promotes effective operations by encouraging performance-based management and facilitating the restructuring of mission- and business-related processes, where appropriate, before making significant IT investments to improve the performance and cost-effectiveness of the Department's information management activities. In addition, the OCIO's Office of Cybersecurity implements and maintains a comprehensive

58

Final Draft Strategic Marketing Plan.  

SciTech Connect

The Bonneville Power Administration (BPA) has developed a marketing plan to define how BPA can be viable and competitive in the future, a result important to BPA`s customers and constituents. The Marketing Plan represents the preferred customer outcomes, marketplace achievements, and competitive advantage required to accomplish the Vision and the Strategic Business Objectives of the agency. The Marketing Plan contributes to successful implementation of BPA`s Strategic Business Objectives (SBOs) by providing common guidance to organizations and activities throughout the agency responsible for (1) planning, constructing, operating, and maintaining the Federal Columbia River Power System; (2) conducting business with BPA`s customers; and (3) providing required internal support services.

United States. Bonneville Power Administration.

1994-02-01T23:59:59.000Z

59

Strategic Energy Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Energy Planning Strategic Energy Planning Strategic Energy Planning Below are resources for Tribes on strategic energy planning. Alaska Strategic Energy Plan and Planning Handbook Describes the process for developing a community energy strategic plan and provides fillable fields for Alaska Native villages and communities to input their own information and outcomes from energy planning discussions. The information entered is automatically compiled into a cohesive summary at the end of the document, in effect establishing the community's strategic energy plan. Source: DOE Office of Indian Energy. Developing Tribal Energy Projects: Community Energy Planning Highlights a strategic energy planning process for Tribes that is being put into practice through the DOE Office of Indian Energy's Strategic

60

Strategic Plan Update Lydia Pleotis Howell MD  

E-Print Network (OSTI)

diagnostic testing that is tailored to the prevention and management of disease. 4. Develop a culture....where are we at and what have we accomplished?? #12; Maximized resources, efficiency and effectiveness CultureStrategic Plan Update 2014-2015 Lydia Pleotis Howell MD Professor and Chair Pathology

Leistikow, Bruce N.

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Strategic Plan Update Lydia Pleotis Howell MD  

E-Print Network (OSTI)

diagnostic testing that is tailored to the prevention and management of disease. 4. Develop a culture....where are we at and what have we accomplished?? #12; Maximized resources, efficiency and effectiveness CultureStrategic Plan Update 2013-2014 Lydia Pleotis Howell MD Professor and Chair Pathology

Leistikow, Bruce N.

62

STRATEGIC PLAN August 19, 2011  

E-Print Network (OSTI)

Planning Team Members 27 #12;SEAS STRATEGIC PLAN 2 | P a g e INTRODUCTION SEAS History The School of Engineering and Applied Science at the University of Virginia got its start as the School of Civil Engineering in 1836. It was the first engineering school in the South and the fourth university-level engineering

Acton, Scott

63

Secretary Directs FPO to Prepare Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2004 Volume 1, Number 2 January 2004 Volume 1, Number 2 In This Issue * Executive Order Update * $1 Million for Manhattan Project Preservation * 2004 DOE Cultural Resources Forum * ES&H Cultural Resources Update * FPO Site Visits * Oak Ridge Historic Preservation Update * Featured Site: Pantex * Save America's Treasures * Manhattan Project Interactive Website * Goucher College: HP Education Opportunity * Atomic Testing Museum Moves Forward Secretary Directs FPO to Prepare Strategic Plan On December 2, 2003, Secretary of Energy Spencer Abraham directed DOE's Federal Preservation Officer, Chief Historian F. G. Gosling, to prepare a strategic plan for the Department's history and historic preservation/cultural resource management programs. The Secretary (right) gave Gosling 90

64

Strategic Planning Committee for  

E-Print Network (OSTI)

but elaborate upon them in Final Report. Strategic Goal 1: Strengthen the Infrastructure of Graduate Education the university needs to strengthen its infrastructure. The Graduate College has been in a state of transition model that runs graduate education through line colleges. There are also hybrid approaches that have

Moore, Paul A.

65

2011-2020 Strategic Plan Highlights Brochure | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2011-2020 Strategic Plan Highlights Brochure Strategic Plan Highlights 2011-2020 LM Brochure More Documents & Publications 2011-2020 Strategic Plan Program Update: 4th...

66

Alaska Strategic Energy Plan and Planning Handbook  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence Ave. SW, Washington DC 20585 | 202-586-1272 energy.gov/indianenergy | indianenergy@hq.doe.gov Alaska Strategic Energy Plan and Planning Handbook ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned

67

Tribal Strategic Energy Plan and Planning Handbook  

Energy.gov (U.S. Department of Energy (DOE))

The Tribal Strategic Energy Plan and Planning Handbook, published by the DOE Office of Indian Energy, is a tool for Tribes to use to help achieve energy goals in both the near- and long-term. This Handbook intends to help tribal leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building.

68

STRATEGIC PLAN 2011 2016: SUMMARY i. Charter, Mission and Strategic Vision 2  

E-Print Network (OSTI)

and Advocacy Campus People and Culture Finance 路 The Plan incorporates short, medium and long term performance & Resources Committee, its Senior Management Team, Heads of School and Heads of Departments fora, and a teamSTRATEGIC PLAN 2011 颅 2016: SUMMARY Contents i. Charter, Mission and Strategic Vision 2 ii

Subramanian, Sriram

69

Guide to Community Energy Strategic Planning  

Energy.gov (U.S. Department of Energy (DOE))

This guide introduces the Community Energy Strategic Plan (CESP) approach, a step-by-step process for creating a robust strategic energy plan for your government and community that can help save...

70

Implementation Standing Technical Committee Strategic Plan - February 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Implementation Standing Technical Committee Strategic Plan, v2012a - February 2012 Committee Chair: 2011 Stacy Hunt and Deane Evans Building Media and Building America Retrofit Alliance (BARA) BSC Contents Definitions ................................................................................................................................................... iii Preface ......................................................................................................................................................... 4 Introduction: Strategic Goals and Integration ......................................................................................... 5 Management Plans for the 2012 I-STC ...................................................................................................... 8

71

Space Conditioning Standing Technical Committee Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE))

This strategic plan document outlines the gaps, barriers, and opportunities identified by the Building America Space Conditioning Standing Technical Committee.

72

Strategic Energy Planning Webinar Text Version  

Energy.gov (U.S. Department of Energy (DOE))

Download the text version of the audio from the DOE Office of Indian Energy webinar on strategic energy planning.

73

Community Energy Strategic Planning- Step 4  

Energy.gov (U.S. Department of Energy (DOE))

This presentation provides Step 4 to the Community Energy Strategic Planning approach, Assess the Current Energy Profile.

74

Strategic Planning FrameworkAugust/September 2012 Vision The Office of Academic Affairs will provide leadership in the development and management of the medical curriculum.  

E-Print Network (OSTI)

of education resources and Promote a culture of excellence in the program Present OAA as the gatewayStrategic Planning FrameworkAugust/September 2012 Vision The Office of Academic Affairs will provide leadership in the development and management of the medical curriculum

Gilbert, Matthew

75

Recreation Strategic Plan Page left intentionally blank  

E-Print Network (OSTI)

Recreation Strategic Plan April 2011 #12;Page left intentionally blank #12;CECW-CO DEPARTMENT AND DISTRICTS SUBJECT: U.S. Army Corps ofEngineers National Recreation Program Strategic Plan 1. The enclosed USACE National Recreation Program Strategic Plan provides long-term guidance for our recreation program

US Army Corps of Engineers

76

Strategic Plan: Implementation and  

E-Print Network (OSTI)

Findings From: Planning Interviews Stakeholder Survey Environmental Assessment Refine Mission and Vision Define Goals with Measurable Outcomes Develop Specific Strategies & Tactics Finalize;Improving lives and transforming healthcare.* Mission Statement 颅 "Core Purpose" Vision Statement

Nguyen, Danh

77

Community Energy Strategic Planning Resources | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resources Community Energy Strategic Planning Resources Presentation for the Community Energy Stategic Planning Resources webinar, presented on January 24, 2013 as part of the U.S....

78

DOE Strategic Human Capital Plan (FY 2011 - 2015) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Human Capital Plan (FY 2011 - 2015) Strategic Human Capital Plan (FY 2011 - 2015) DOE Strategic Human Capital Plan (FY 2011 - 2015) The Strategic Human Capital Plan sets forth the framework for managing the Department of Energy's (DOE) human capital system through 2015. This Plan, which supersedes the 2006 Strategic Human Capital Management Plan and the 2008 Strategic Human Capital Management Addendum, aligns with the following priority of the Management Excellence Agenda from the DOE Strategic Plan and the DOE Operations Management Council: Develop the most highly-qualified, capable, and flexible federal workforce, beginning with hiring reform as a cornerstone of transformation. The goals of the Plan directly support DOE Management Principle #3: We will treat our people as our greatest asset.

79

2011-2020 Strategic Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan 2011-2020 Strategic Plan LM has completed its 2011-2020 Strategic Plan. The new plan provides our organization with clear directions for the future. 2011-2020 Strategic Plan...

80

2010 DOE Strategic Sustainability Performance Plan - Report to the White  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2010 DOE Strategic Sustainability Performance Plan - Report to the 2010 DOE Strategic Sustainability Performance Plan - Report to the White House Council on Environmental Quality and Office of Management and Budget 2010 DOE Strategic Sustainability Performance Plan - Report to the White House Council on Environmental Quality and Office of Management and Budget Sustainability is fundamental to the Department of Energy's research mission and operations as reflected in the Department's Strategic Plan. Our overarching mission is to discover the solutions to power and secure America's future. We are implementing our mission through three strategic goals: Innovation to maintain U.S. global leadership in science and engineering; Energy to build a competitive and sustainable clean energy economy to secure America's energy future; and Security to reduce nuclear

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Strategic Facility Management: A White Paper | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Facility Management: A White Paper Strategic Facility Management: A White Paper Strategic Facility Management: A White Paper In the real world of facility management (FM), a plethora of activities fall under the facility manager's responsibility, causing frequent lapses into a reactive mode in order to respond to all the requests, orders, regulations, deadlines and demands of the organization. Facility managers know that the need to become more proactive and strategic is important, but finding the time to devote to strategic planning is often a struggle. As Stephen Covey teaches, we need to prioritize what is important rather than simply urgent in order to gain maximum effectiveness. Strategic facility planning (SFP) is a process that can lead to better, more proactive delivery of services from a facility management organization

82

Strategic Facility Management: A White Paper | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Facility Management: A White Paper Strategic Facility Management: A White Paper Strategic Facility Management: A White Paper In the real world of facility management (FM), a plethora of activities fall under the facility manager's responsibility, causing frequent lapses into a reactive mode in order to respond to all the requests, orders, regulations, deadlines and demands of the organization. Facility managers know that the need to become more proactive and strategic is important, but finding the time to devote to strategic planning is often a struggle. As Stephen Covey teaches, we need to prioritize what is important rather than simply urgent in order to gain maximum effectiveness. Strategic facility planning (SFP) is a process that can lead to better, more proactive delivery of services from a facility management organization

83

UHUH''ss Strategic PlanningStrategic Planning Overview, 2005Overview, 20050909  

E-Print Network (OSTI)

going rate (2-yr, 4-yr) 路 Job shortages (workforce needs) UH's Strategic Planning Overview, 2005颅09 APPUHUH''ss Strategic PlanningStrategic Planning Overview, 2005Overview, 2005颅颅0909 Linda K. Johnsrud Vice President for Academic Planning & Policy Board of Regents Meeting September 17, 2009 UH

Dong, Yingfei

84

The New Approach to Strategic Energy Planning  

E-Print Network (OSTI)

THE NEW APPROACH TO STRATEGIC ENERGY PLANNING N. RICHARD FRIEDMAN Chairman Resource Dynamics Corporation Vienna, Virginia ABSTRACT The changing industrial energy market is placing a new emphasis on the strategic element of energy... planning. No longer a "lowest-cost analysis" discipline, successful energy planning today involved a sophisticated approach that integrated energy decisions into the development of overall corporate business strategy. The integration of strategic...

Friedman, N. R.

85

Carlsbad Area Office strategic plan  

SciTech Connect

This edition of the Carlsbad Area Office Strategic Plan captures the U.S. Department of Energy`s new focus, and supercedes the edition issued previously in 1995. This revision reflects a revised strategy designed to demonstrate compliance with environmental regulations earlier than the previous course of action; and a focus on the selected combination of scientific investigations, engineered alternatives, and waste acceptance criteria for supporting the compliance applications. An overview of operations and historical aspects of the Waste Isolation Pilot Plant near Carlsbad, New Mexico is presented.

NONE

1995-10-01T23:59:59.000Z

86

Automated Home Energy Management (AHEM) Standing Technical Committee Strategic Plan- February 2012  

Energy.gov (U.S. Department of Energy (DOE))

This report outlines the gaps, barriers, and opportunities in automated home energy management tools, as outlined by the Building America Standing Technical Committee.

87

ATLAS_Strategic_Plan_14_August _9  

NLE Websites -- All DOE Office Websites (Extended Search)

ATLAS Accelerator Facility Physics Division Argonne National Laboratory Argonne, IL June 2014 2 Introduction This strategic plan is developed jointly by the ATLAS user community...

88

NERSC Strategic Plan Is Now Online  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Plan Strategic Plan Is Now Online NERSC Strategic Plan Is Now Online June 3, 2013 The NERSC Strategic Plan for FY2014-2023 is now available for download (PDF | 3.2MB). Requested by the DOE Office of Advanced Scientific Computing Research as input for ASCR's long-term planning, the strategic plan discusses NERSC's mission, goals, science drivers, planned initiatives, and technology strategy, among other topics. 鈮玀ore NERSC publications and reports. About NERSC and Berkeley Lab The National Energy Research Scientific Computing Center (NERSC) is the primary high-performance computing facility for scientific research sponsored by the U.S. Department of Energy's Office of Science. Located at Lawrence Berkeley National Laboratory, the NERSC Center serves more than

89

SCHOOL OF MEDICINE -STRATEGIC PLAN 2009-2014 Approved 22.07.10 STRATEGIC PLAN  

E-Print Network (OSTI)

Medicine, Nature Immunology, Nature Nanotechnology and Science over the last few years. ResearchSCHOOL OF MEDICINE - STRATEGIC PLAN 2009-2014 Approved 22.07.10 Page 1/61 STRATEGIC PLAN SCHOOL OF MEDICINE 2009-2014 #12;SCHOOL OF MEDICINE - STRATEGIC PLAN 2009-2014 Approved 22.07.10 Page 2/61 CONTENTS

O'Mahony, Donal E.

90

NNSA Strategic Performance Evaluation Plan (PEP) FOR MANAGEMENT AND OPERATION OF  

National Nuclear Security Administration (NNSA)

MANAGEMENT AND OPERATION OF MANAGEMENT AND OPERATION OF Los Alamos National Security, LLC Contract Number: DE-AC52-06NA25396 Performance period: October 01, 2012 through September 30, 2013 Director ~;!;tory '1'/r/;L Steven K. Shook Date Chief, Prime Contracts Office Los Alamos National Laboratory Kevin W. Smith Manager Los Alamos Site Office :dd:.- Date 7J~;i;curity Ad~i]~/2-- Robert M. Poole Date Contracting Officer Los Alamos Site Office National Nuclear Security Administration INTRODUCTION The Los Alamos National Laboratory is managed by Los Alamos National Security,LLC, herein referenced as "Contractor", for the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). Pursuant to the terms and conditions of the Contract, and Clause H-12,

91

Enclosures Standing Technical Committee Strategic Plan report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Enclosures Standing Technical Committee Enclosures Standing Technical Committee Strategic Plan, v2011a Revised: December 2011 Committee Chair: 2011 Joseph Lstiburek Kohta Ueno Katie Boucher Building Science Corporation i Contents List of Figures ............................................................................................................................................. ii List of Tables .............................................................................................................................................. iii Definitions ................................................................................................................................................... iv 1. Enclosures STC Strategic Plan Overview ............................................................................................ 1

92

NASA 2011 Strategic Plan Vision & Mission  

E-Print Network (OSTI)

NASA 2011 Strategic Plan Vision & Mission Vision: NASA leads scientific and technological advances, education, innovation, economic vitality, and stewardship of the Earth. #12;NASA 2011 Strategic Plan Goals capabilities to conduct NASA's aeronautics and space activities. 路 Goal 6: Share NASA with the public

Waliser, Duane E.

93

Sustainability Strategic Plan College of Social Sciences  

E-Print Network (OSTI)

Sustainability Strategic Plan College of Social Sciences San Jos茅 State University Fall 2010 #12;Rachel O'Malley Faculty in Residence for Sustainability College of Social Sciences San Jos茅 State University July 30, 2010 Sustainability Strategic Plan College of Social Sciences, San Jos茅 State University

Su, Xiao

94

EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM's Strategic Planning Initiative Examines Impact of Lower Funding EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets February 1, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM is conducting a strategic planning effort that aims to optimize progress in the organization's environmental cleanup program. As part of efforts to continuously improve the effectiveness and efficiency of resource management and build on the success of the $6 billion EM American Recovery and Reinvestment Act Program, EM headquarters officials are working with staff at EM's 17 field sites to analyze the impact of austere funding projections on project costs and schedules. EM is working to align the cleanup program with current budget realities and prioritize

95

EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM's Strategic Planning Initiative Examines Impact of Lower Funding EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets February 1, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM is conducting a strategic planning effort that aims to optimize progress in the organization's environmental cleanup program. As part of efforts to continuously improve the effectiveness and efficiency of resource management and build on the success of the $6 billion EM American Recovery and Reinvestment Act Program, EM headquarters officials are working with staff at EM's 17 field sites to analyze the impact of austere funding projections on project costs and schedules. EM is working to align the cleanup program with current budget realities and prioritize

96

Alaska Strategic Energy Plan and Planning Handbook | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the Office of Indian Energy, is a tool for Alaska Native Villages and communities to use in achieving energy goals in both the near- and long-term. This Handbook intends to help Alaska Native leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building. The Handbook: Provides a step-by-step process that Alaska Native villages and communities may wish to use as a roadmap for discussion and decisions related to strategic energy planning and energy project prioritization Includes blank text boxes for communities to input their own

97

Strategic Energy Planning Webinar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Energy Planning Webinar Strategic Energy Planning Webinar Strategic Energy Planning Webinar February 26, 2014 11:00AM MST Attendees will learn about developing a strategic energy plan, identifying key aspects of successful energy planning, and using available information and resources, including archived webinars in the series from the DOE Office of Indian Energy Education Initiative. Attendees will understand how the plan 1) enables the Tribe to mobilize the long-term support necessary for energy project development that extends beyond changing political administrations, 2) helps address barriers to energy development by providing a long-term view that prioritizes projects over not just years but several decades, and 3) engages stakeholders from all segments of the community to help the Tribe pursue energy development projects in a

98

Planning Tool for Strategic Evaluation of Facility Plans - 13570  

SciTech Connect

Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

Magoulas, Virginia; Cercy, Michael [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States)] [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States); Hall, Irin [Newport News Shipbuilding, 4101 Washington Ave., Newport News, VA 23607 (United States)] [Newport News Shipbuilding, 4101 Washington Ave., Newport News, VA 23607 (United States)

2013-07-01T23:59:59.000Z

99

UTHSC College of Nursing Strategic Plan Goals  

E-Print Network (OSTI)

a design process for the Crowe Building that realizes CON's strategic needs 5.3 Secure diverse financial.5 Strengthen the PhD program through increased faculty research Strategic Initiative: Integrated Faculty Practice 4.1 Redesign Faculty Practice Plan to better facilitate the integration of practice, research

Cui, Yan

100

Online Money Management Tools for Students Borrow strategically  

E-Print Network (OSTI)

Online Money Management Tools for Students Borrow strategically Direct Loan program: studentloans.com/CreditEducation/WhatsInYourScore.aspx What you need to know about your credit: ftc.gov/gettingcredit Manage your personal finances Money management: onestop.umn.edu/finances/manage_money Planning your financial life: mymoney.gov Identity Theft

Weinberger, Hans

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Strategic Plan for Minority Education Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 Strategic Plan for FY 2009 Strategic Plan for 09 Strategic Plan for FY 2009 Strategic Plan for Minority Education Programs Minority Education Programs The Office of Minority Economic Impact (OMEI) is committed to serving as the primary advocate for minority education institutions and shepherding the Department's support of these institutions by implementing programs to enhance economic and community development capacities among under- represented populations. Prepared by: THE OFFICE OF ECONOMIC IMPACT & DIVERSITY Office of Minority Economic Impact Overview: Mission, Core Values and Vision Mission The mission of the Department's Office of Minority Economic Impact is to build effective partnerships between the Department and minority institutions, increase the capabilities of such institutions to compete effectively for grants and contracts, and to

102

Strategic Plan Department of Physics and Astronomy  

E-Print Network (OSTI)

Strategic Plan Department of Physics and Astronomy University of Tennessee, Knoxville September (Ex Officio), and Hanno Weitering #12;Introduction The Department of Physics and Astronomy has over. Figure 1: Schematic diagram illustrating the Department of Physics and Astronomy's interactions

Dai, Pengcheng

103

Strategic Plan Department of Physics and Astronomy  

E-Print Network (OSTI)

1 Strategic Plan Department of Physics and Astronomy University of Tennessee, Knoxville Fall 2011)........................................................... 46 #12;3 Introduction The Department of Physics and Astronomy has over the last two decades had

Dai, Pengcheng

104

Guide to Community Energy Strategic Planning  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) Solution Center publishes this strategic energy planning guide for state and local governments. This links to the entire document.

105

Guide to Community Energy Strategic Planning: Introduction  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) Solution Center publishes this strategic energy planning guide for state and local governments. This links to the introduction.

106

Academic Testing Services Strategic Plan 2010 -2015  

E-Print Network (OSTI)

Academic Testing Services Strategic Plan 2010 - 2015 Contribute to increasing enrollment and promoting student success: Provide test assessments which are integral to higher education participation and progression Provide a quality test environment conducive to optimal performance and success Provide quality

Rock, Chris

107

UNIVERSITY OF SASKATCHEWAN Strategic Research Plan Summary  

E-Print Network (OSTI)

UNIVERSITY OF SASKATCHEWAN Strategic Research Plan Summary Canada ResearchChairs Program, Canada provinceofSaskatchewan,inits academic programs and the qualityof the learning environment of Saskatchewan has established an international reputation for achievement in a diversity of disciplines

Patterson, William P.

108

UNIVERSITY OF SASKATCHEWAN Strategic Research Plan  

E-Print Network (OSTI)

UNIVERSITY OF SASKATCHEWAN Strategic Research Plan Canada ResearchChairs Program, Canada Excellence provinceofSaskatchewan,inits academic programs and the qualityof the learning environment of Saskatchewan has established an international reputation for achievement in a diversity of disciplines

Patterson, William P.

109

ATLAS_Strategic_Plan_09_v5  

NLE Websites -- All DOE Office Websites (Extended Search)

in light of existing budget constraints. Strategic Plan Mission: The mission for the ATLAS facility at Argonne is to enable research of the highest quality by its users and...

110

Technology Support Strategic Plan MISSION STATEMENT  

E-Print Network (OSTI)

1 Technology Support Strategic Plan MISSION STATEMENT Through collaboration and professionalism, the Technology Support Department provides the highest possible quality Information Technology (IT) services, support, and assistance to the University community. VISION STATEMENT Technology Support

Westfall, Peter H.

111

UNE Strategic Plan 2007 -2010 The Strategic Use of ICT  

E-Print Network (OSTI)

路 Technology is to be used to strengthen student attractors 路 Internet-intranet communications and stand technology (ICT) and systems will significantly affect the University's ability to achieve its goals. While the Strategic Plan recognises the need to modernise technologies and ICT systems used in teaching, learning

Dunstan, Neil

112

Division of Student Affairs Strategic Plan  

E-Print Network (OSTI)

and the Academic Master Plan Appendix B Division Comprehensive Program Review Timeline 20 #12;3 Section I Overview every 5-7 years. The review includes a time of preparation, a self-study, a peer review, action planning program review. #12;4 Section II Strategic Plan: Mission, Vision, Core Values, Goals A. Mission

113

Workforce Management Office WORKFORCE AND SUCCESSION PLANNING  

E-Print Network (OSTI)

2012 Workforce Management Office NOAA 1/1/2012 WORKFORCE AND SUCCESSION PLANNING Toolkit to Identify and Address Strategic Talent Gaps #12;Workforce & Succession Planning Toolkit NOAA Workforce .......................................................................................................3 Workforce Planning

114

2008: Revised Research Plan - An update to the 2003 Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

8: Revised Research Plan - An update to the 2003 Strategic Plan Print E-mail 8: Revised Research Plan - An update to the 2003 Strategic Plan Print E-mail The Revised Research Plan is an update to the 2003 Strategic Plan of the US Climate Change Science Program (CCSP), a document that was developed via a thorough, open and transparent multi-year process involving a wide range of scientists and managers. The Strategic Plan has long-term value to CCSP, but like any strategic plan, it must be supplemented by shorter-term revisions that take into account both advances in the science and changes in societal needs, and CCSP has an ongoing long-range strategic planning process to ensure that these needs are met. The Revised Research Plan (hereinafter referred to as the Research Plan) draws on CCSP's long-range planning process and provides this update, in compliance with the terms of the Global Change Research Act (GCRA) of 1990.

115

2006 Department of Energy Strategic Plan - Ensuring America's nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2006 Department of Energy Strategic Plan - Ensuring America's 2006 Department of Energy Strategic Plan - Ensuring America's nuclear security 2006 Department of Energy Strategic Plan - Ensuring America's nuclear security In 2000, the National Nuclear Security Administration (NNSA) was established as a new element within the Department in response to a Congressional mandate to reinvigorate the security posture throughout the nuclear weapons program and to reaffirm the Nation's commitment to maintaining the nuclear deterrence capabilities of the United States. NNSA was chartered to better focus management attention on enhanced security, proactive management practices, and mission focus within the Department's national defense and nonproliferation programs. The Department performs its national security mission involving nuclear weapons and nuclear materials

116

UWM Strategic Plan 2020 Transforming UWM Into an Engaged,  

E-Print Network (OSTI)

This slide deck does not represent the entire DRAFT Strategic Plan. The DRAFT plan is being shared for review does not represent the entire DRAFT Strategic Plan. The DRAFT plan is being shared for review not represent the entire DRAFT Strategic Plan. The DRAFT plan is being shared for review, suggestions

Saldin, Dilano

117

Alternative Fuels Data Center: State Agency Strategic Energy Plans  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

State Agency Strategic State Agency Strategic Energy Plans to someone by E-mail Share Alternative Fuels Data Center: State Agency Strategic Energy Plans on Facebook Tweet about Alternative Fuels Data Center: State Agency Strategic Energy Plans on Twitter Bookmark Alternative Fuels Data Center: State Agency Strategic Energy Plans on Google Bookmark Alternative Fuels Data Center: State Agency Strategic Energy Plans on Delicious Rank Alternative Fuels Data Center: State Agency Strategic Energy Plans on Digg Find More places to share Alternative Fuels Data Center: State Agency Strategic Energy Plans on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type State Agency Strategic Energy Plans Each Arkansas state agency must develop an individual strategic energy plan

118

Environmental Restoration Program Roadmap: Strategic program plan  

SciTech Connect

This document is a strategic plan for accomplishing environmental restoration objectives at the Department of Energy`s (DOE) Portsmouth Gaseous Diffusion Plant (PORTS). Waste Management (WM) for environmental restoration activities and integration of these activities into the PORTS WM operations is addressed in this document. The document provides detailed information concerning specific assumptions and activities required to meet DOE`s environmental restoration objectives at this site. Environmental contamination at PORTS consists mainly of spent solvents and low level radionuclides. Solvents were used for industrial metal cleaning operations required to maintain the process during operations. Plumes of groundwater contamination resulting from past disposal of these spent solvents in landfills and impoundments extend from several locations within the site. Also, two sludge impoundments associated with a chromate reduction facility were characterized as having soil and groundwater contaminated with hexavalent chromium.

Not Available

1992-09-30T23:59:59.000Z

119

Environmental Restoration Program Roadmap: Strategic program plan  

SciTech Connect

This document is a strategic plan for accomplishing environmental restoration objectives at the Department of Energy's (DOE) Portsmouth Gaseous Diffusion Plant (PORTS). Waste Management (WM) for environmental restoration activities and integration of these activities into the PORTS WM operations is addressed in this document. The document provides detailed information concerning specific assumptions and activities required to meet DOE's environmental restoration objectives at this site. Environmental contamination at PORTS consists mainly of spent solvents and low level radionuclides. Solvents were used for industrial metal cleaning operations required to maintain the process during operations. Plumes of groundwater contamination resulting from past disposal of these spent solvents in landfills and impoundments extend from several locations within the site. Also, two sludge impoundments associated with a chromate reduction facility were characterized as having soil and groundwater contaminated with hexavalent chromium.

Not Available

1992-09-30T23:59:59.000Z

120

Library strategic plan -April 2009.docx[Type text] Page 1 Library Strategic Plan  

E-Print Network (OSTI)

Library strategic plan - April 2009.docx[Type text] Page 1 Library Strategic Plan I. Division/School Core Purpose The Library's mission is to make available a comprehensive collection of scholarly of Charleston Library, the Avery Research Center, and the Marine Resources Library have forged formal

Kunkle, Tom

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Strategic Plan 2012 Update Based on  

E-Print Network (OSTI)

colleges include: 路 Agricultural Sciences 路 Applied Human Sciences 路 Business 路 Engineering 路 Liberal Arts 路 Warner College of Natural Resources 路 Natural Sciences 路 Veterinary Medicine and Biomedical Sciences Planning Area 3: Outreach and Engagement ....... 19 Strategic Planning Area 4: Sustainability

122

ACTION PLANS STRATEGIC PRIORITY: Role Clarification (revised)  

E-Print Network (OSTI)

with the President, Director & Associate Director. Review current communications plan for Executive and BoardACTION PLANS STRATEGIC PRIORITY: Role Clarification (revised) GOAL Foster pride and participation informed MAA Board Investigate an increase in number of Executive Committee meetings with standard agenda

Thompson, Michael

123

Energy Storage Safety Strategic Plan- December 2014  

Energy.gov (U.S. Department of Energy (DOE))

The Energy Storage Safety Strategic Plan is a roadmap for grid energy storage safety that addresses the range of grid-scale, utility, community, and residential energy storage technologies being deployed across the Nation. The Plan highlights safety validation techniques, incident preparedness, safety codes, standards, and regulations, and makes recommendations for near- and long-term actions.

124

Strategic marketing plans and collaborative networks  

E-Print Network (OSTI)

Strategic marketing plans and collaborative networks Marcos Fava Neves University of Sa~o Paulo, Ribeira~o Preto, Brazil Abstract Purpose 颅 This paper seeks to propose a new framework for the marketing/methodology/approach 颅 A review of the academic literature of marketing planning, three participant-observation case studies

125

Energy Storage Safety Strategic Plan Now Available  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Electricity Delivery and Energy Reliability (OE) has worked with industry and other stakeholders to develop the Energy Storage Safety Strategic Plan, a roadmap for grid energy storage safety that highlights safety validation techniques, incident preparedness, safety codes, standards, and regulations. The Plan also makes recommendations for near- and long-term actions.

126

Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan The natural resources of the Gulf's ecosystem are vital to many of the region's industries that directly support economic progress and job creation, including tourism and recreation, seafood production and sales, energy production and navigation and commerce. Among the key priorities of the strategy are: 1) Stopping the Loss of Critical Wetlands, Sand Barriers and Beaches The strategy recommends placing ecosystem restoration on an equal footing with historic uses such as navigation and flood damage reduction by approaching water resource management decisions in a far more comprehensive manner that will bypass harm to wetlands, barrier islands and beaches. The

127

Microsoft Word - DOE 2012-2015 Diversityand inclusion Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 - 2 0 1 5 2 - 2 0 1 5 D e p a r t me n t o f E n e r g y D i v e r s i t y & I n c l u s i o n S t r a t e g i c P l a n Department of Energy's Diversity and Inclusion Strategic Plan: 2012 -2015 i Message from the March 23, 2012 Secretary of Energy The Department of Energy (DOE) is pleased to provide its 2012-2015 Diversity and Inclusion Strategic Plan. Achieving the Department of Energy's mission and goals will involve creating a culture which values the contributions of all DOE employees and provides equal opportunity for professional development and career advancement. Therefore, as we implement this Diversity and Inclusion Strategic Plan, we must reaffirm DOE's Management principles, and apply three central ideas: Mission Focus,

128

Natural gas strategic plan and program crosscut plans  

SciTech Connect

The natural gas strategic plan recognizes the challenges and opportunities facing increased U.S. natural gas use. Focus areas of research include natural gas supply, delivery, and storage, power generation, industrial, residential and commercial, natural gas vehicles, and the environment. Historical aspects, mission, situation analysis, technology trends, strategic issues, performance indicators, technology program overviews, and forecasting in the above areas are described.

NONE

1995-06-01T23:59:59.000Z

129

Windward Community College Strategic Plan  

E-Print Network (OSTI)

.......................................................1 II. DESCRIPTION OF THE COLLEGE PLANNING PROCESS.......................................3 A with career exploration, technolo

130

Department of Energy Releases 2011 Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy U.S. Department of Energy Office of Public Affairs News Media Contact: (202) 586-4940 For Immediate Release: Tuesday, May 10, 2011 Department of Energy Releases 2011 Strategic Plan Washington, D.C.锟 The Department of Energy today released its 2011 Strategic Plan, a comprehensive blueprint to guide the agency锟絪 core mission of ensuring America锟絪 security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. In the opening of the DOE Strategic Plan, Secretary Chu writes: 锟絋he Department of Energy plays an important and unique role in the U.S. science and technology community. The Department锟絪 missions and programs are designed to bring the best scientific minds and capabilities to bear on

131

Bottling Electricity: Storage as a Strategic Tool for Managing Variability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bottling Electricity: Storage as a Strategic Tool for Managing Bottling Electricity: Storage as a Strategic Tool for Managing Variability and Capacity Concerns in the Modern Grid - EAC Report (December 2008) Bottling Electricity: Storage as a Strategic Tool for Managing Variability and Capacity Concerns in the Modern Grid - EAC Report (December 2008) The objectives of this report are to provide the Secretary of Energy with the Electricity Advisory Committee's proposed five-year plan for integrating basic and applied research on energy storage technology applications. This report recommends policies that the U.S. Department of Energy (DOE) should consider as it develops and implements an energy storage technologies program, as authorized by the Energy Independence and Security Act of 2007. Bottling Electricity: Storage as a Strategic Tool for Managing Variability

132

Diversity and Inclusion Strategic Plan 2012 - 2015 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Plan 2012 - 2015 Strategic Plan 2012 - 2015 Diversity and Inclusion Strategic Plan 2012 - 2015 Our Diversity and Inclusion Strategic Plan is designed to create a culture which values trust and human dignity and provides the opportunity for personal development and self- fulfillment in the attainment of DOE's mission and goals. The 2012- 2015 strategic plan has three essential pillars - mission focus, accountability, and continual learning. It also: Creates a universal definition of diversity and inclusion. Designs strategic outreach and recruitment initiatives to reach all segments of society. Creates an internal DOE-wide Diversity and Inclusion Council to monitor progress and support employee engagement. Promotes effective communication with employees and stakeholders to

133

Florida Sea Grant College Program Strategic Plan 20092013  

E-Print Network (OSTI)

1 Florida Sea Grant College Program Strategic Plan 20092013 Science Serving Florida's Coast Introduction Florida Sea Grant's Strategic Plan for 2009 to 2013 reflects Grant's role and strategies for addressing critical coastal and marine issues in the framework of four

134

NEGTN02-#167312-v7-GNEP_STRATEGIC_PLAN_-_FINAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GNEP-167312, Rev. 0 GNEP-167312, Rev. 0 Global Nuclear Energy Partnership Strategic Plan U.S. Department of Energy Office of Nuclear Energy Office of Fuel Cycle Management January 2007 GNEP-167312, Rev 0 i GNEP Strategic Plan Table of Contents 1.0 Policy ......................................................................................................................1 1.1 Purpose................................................................................................................1 1.2 Principles .............................................................................................................1 2.0 Implementation .......................................................................................................2

135

Strategic Plan Submitted to the Secretary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Volume 1, Number 3 4 Volume 1, Number 3 In This Issue * Executive Order Update * $1 Million for Manhattan Project Preservation * 2004 DOE Cultural Resources Forum * ES&H Cultural Resources Update * FPO Site Visits * Oppenheimer and the Manhattan Project Event * Museum Notes * Save America's Treasures * Featured Photo: Oak Ridge, 1949 Strategic Plan Submitted to the Secretary The strategic plan for history and heritage resources that Secretary Abraham directed the Federal Preservation Officer to prepare has been submitted and is under review. Following the December 2, 2003, briefing at which the Secretary directed preparation of a plan to make recommendations for the full range of the Department's history and heritage resources, FPO Skip Gosling and Deputy FPO Terry Fehner put together a small planning

136

Strategic Plan The School of Engineering  

E-Print Network (OSTI)

of knowledge of the field of engineering, and assist in the economic development of the state and nation; and 310-Year Strategic Plan 2003-2013 The School of Engineering at the University of Kansas KU School of Engineering 1 Eaton Hall (785) 864-2930 (voice) (785) 864-5445 (fax) sbell@ku.edu #12;Executive Summary

137

January 13, 2005 NJIT Library Strategic Plan  

E-Print Network (OSTI)

place on campus for study. a. Objective: Renovate and refurbish existing library space (including former additional bound journals and books as well as free up space for more main library and architecture libraryJanuary 13, 2005 NJIT Library Strategic Plan AY 2005-AY 2009 Mission The NJIT library satisfies

Bieber, Michael

138

School of Engineering and Mines Strategic Plan  

E-Print Network (OSTI)

environment, 5) responsibly engages the community and region, and 6) promotes success of our alumniPage 1/40 School of Engineering and Mines Strategic Plan March 28, 2011 #12;Page 2/40 TABLE...................................................................20 Vision Building Block 4 颅 Work Environment..................................................28

Delene, David J.

139

THE STANFORD SYNCHROTRON RADIATION LIGHTSOURCE STRATEGIC PLAN:  

NLE Websites -- All DOE Office Websites (Extended Search)

THE STANFORD SYNCHROTRON THE STANFORD SYNCHROTRON RADIATION LIGHTSOURCE STRATEGIC PLAN: 2013 - 2018 MEETING THE SCIENTIFIC CHALLENGES OF THE FUTURE FEBRUARY 2013 TABLE OF CONTENTS 1 Executive Summary ................................................................................................................................................. 1 2 Synchrotron Radiation - A Unique Tool .................................................................................................................. 1 3 Stanford Synchrotron Radiation Lightsource .......................................................................................................... 3 3.1 Looking into the Future: Building a New User Facility Paradigm at SSRL ....................................................... 4

140

National Wetlands Inventory Draft Strategic Plan  

E-Print Network (OSTI)

National Wetlands Inventory Draft Strategic Plan: Conserving America's Wetlands for Future America's Wetlands for Future Generations Cover Photo: Blackwater National Wildlife Refuge, on Virginia's Chesapeake Bay, showing combined climate change and other impacts on wetlands, with dead or dying trees from

Gray, Matthew

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Strategic Plan 2012-2015 Progress Review 2011 2012  

E-Print Network (OSTI)

Strategic Plan 2012-2015 Progress 颅 Review 2011 颅 2012 Academic Units Department of Construction Therapy School of Education School of Social Work #12;Strategic Plan 2012-2015 Progress 颅 Review 2011 the community are used 颅 based on need. #12;Strategic Plan 2012-2015 Progress 颅 Review 2011-2012 Page 3 of 30

Stephens, Graeme L.

142

A Systematic Review on Strategic Release Planning Models Mikael Svahnberg  

E-Print Network (OSTI)

A Systematic Review on Strategic Release Planning Models Mikael Svahnberg , Tony Gorschek, Robert reviewed, and relevant to the subject. Results. 24 strategic release planning models are found and mapped industry trials. Keywords. Strategic Release Planning Models, Systematic Review, Road-mapping, Requirements

Feldt, Robert

143

DOE Awards Management and Operating Contract for DOE's Strategic...  

Energy Savers (EERE)

DOE Awards Management and Operating Contract for DOE's Strategic Petroleum Reserve DOE Awards Management and Operating Contract for DOE's Strategic Petroleum Reserve September 18,...

144

How to Develop A Strategic Energy Plan | Open Energy Information  

Open Energy Info (EERE)

How to Develop A Strategic Energy Plan How to Develop A Strategic Energy Plan Jump to: navigation, search Tool Summary Name: How to Develop A Strategic Energy Plan Agency/Company /Organization: Department of Energy Sector: Energy Focus Area: Renewable Energy, Energy Efficiency Topics: Implementation Resource Type: Guide/manual Website: www.nrel.gov/analysis/pdfs/45652.pdf How to Develop A Strategic Energy Plan Screenshot References: How to Develop A Strategic Energy Plan[1] Logo: How to Develop A Strategic Energy Plan "This guide provides an overview of strategic electricity planning for communities, using a step-by-step approach to develop the plan. This method has a high chance of success, because it is based on stakeholder buy-in and political commitment. Not all communities will need to follow all steps,

145

Robinson Rancheria Strategic Energy Plan; Middletown Rancheria Strategic Energy Plan, Scotts Valley Rancheria Strategic Energy Plan, Elem Indian Colony Strategic Energy Plan, Upperlake Rancheria Strategic Energy Plan, Big Valley Rancheria Strategic Energy Plan  

SciTech Connect

The Scotts Valley Band of Pomo Indians is located in Lake County in Northern California. Similar to the other five federally recognized Indian Tribes in Lake County participating in this project, Scotts Valley Band of Pomo Indians members are challenged by generally increasing energy costs and undeveloped local energy resources. Currently, Tribal decision makers lack sufficient information to make informed decisions about potential renewable energy resources. To meet this challenge efficiently, the Tribes have committed to the Lake County Tribal Energy Program, a multi Tribal program to be based at the Robinson Rancheria and including The Elem Indian Colony, Big Valley Rancheria, Middletown Rancheria, Habematolel Pomo of Upper Lake and the Scotts Valley Pomo Tribe. The mission of this program is to promote Tribal energy efficiency and create employment opportunities and economic opportunities on Tribal Lands through energy resource and energy efficiency development. This program will establish a comprehensive energy strategic plan for the Tribes based on Tribal specific plans that capture economic and environmental benefits while continuing to respect Tribal cultural practices and traditions. The goal is to understand current and future energy consumption and develop both regional and Tribe specific strategic energy plans, including action plans, to clearly identify the energy options for each Tribe.

McGinnis and Associates LLC

2008-08-01T23:59:59.000Z

146

IRSP (integrated resource strategic planning) with interconnected smart grids in integrating renewable energy and implementing DSM (demand side management) in China  

Science Journals Connector (OSTI)

Abstract The China's electricity consumption was 4966燭Wh in 2012, which is the world top electricity consumer. The low carbon electricity is one of the key issues of its sustainable development. IRSP (integrated resource strategic planning) is a useful tool to implement DSM (demand side management) and power planning on the supply side. However, the role of interconnected smart grids with fast growing cross-region transmission is not considered in the IRSP. Therefore, the paper proposes the model of IRSP with interconnected smart grids to integrate more renewable power generation to the grids and implement more DSM projects, which is called as IRSP-sgs (IRSP smart grids) model. Two scenarios are projected to study the impact of cross-region transmission on low carbon electricity by using the IRSP-sgs model until 2025 in China. Results show that the scenario with enhanced cross-region transmission helps to reduce electricity generation by 784.38燭Wh and reduce CO2 emission by 999.57 million tons during 20132025, since the multi-regional power operation can integrate more than 488.30燭Wh renewable generation into the grids and implement more DSM projects to substitute generation. In addition, it also provides tremendous opportunities to improve the stable operation of the power system.

Yanan Zheng; Zhaoguang Hu; Jianhui Wang; Quan Wen

2014-01-01T23:59:59.000Z

147

Space Conditioning Standing Technical Committee Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Space Conditioning Standing Technical Space Conditioning Standing Technical Committee Strategic Plan, v2011a Revised: January 2012 Committee Chair: 2011 Eric Martin Janet McIlvaine BA-PIRC Standing Technical Committee Strategic Plan Overview Standing Technical Committees (STCs) focus on resolving key technical action items required to meet Building America performance goals. STC chairs lead each committees' activities in addressing specific research challenges, gaps in understanding, and new research opportunities. Committees include experts from the Building America research teams, DOE, national laboratories, and outside organizations that possess specialized knowledge or heightened interest in the topics being addressed. Committee chairs can create sub-committees on an as-needed basis to address targeted research needs.

148

Strategic Planning Notes MT AHEC/MORH Advisory Board  

E-Print Network (OSTI)

big, complex issues 颅 Montana Healthcare Workforce Advisory Committee, HC Workforce Strategic PlanStrategic Planning Notes MT AHEC/MORH Advisory Board February 7, 2014 Strategic Priorities 1. Healthcare Workforce Training and educating the workforce Montana needs o Educational infrastructure o

Dyer, Bill

149

Micmac Strategic Energy Planning Initiative  

SciTech Connect

In February 2005 the Aroostook Band of Micmacs submitted a grant application to the U.S. Department of Energy抯 (DOE) Tribal First Steps Program. The purpose of the application was to request funding and technical assistance to identify and document Tribal energy issues, develop a Tribal energy vision, evaluate potential energy opportunities, and to develop an action plan for future Tribal energy activities. The grant application was subsequently funded by DOE, and the Aroostook Band of Micmacs hired an energy consultant to assist with completion of the project. In addition to identification and documentation of Tribal energy issues, and the development of a Tribal energy vision, the potential for wind energy development on Tribal land, and residential energy efficiency issues were thoroughly evaluated.

Fred Corey

2007-02-02T23:59:59.000Z

150

Strategic information systems planning: A case study from the financial services industry  

Science Journals Connector (OSTI)

Strategic Information Systems Planning (SISP) is an important topic for managers and researchers alike. However, there is evidence of a gap between SISP research and practice. Taking this situation as a motivation, we conducted an in depth case study ...

R. A. Teubner

2007-03-01T23:59:59.000Z

151

DOE OIG Strategic Plan Fiscal Years 2009 - 2013 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

9 - 2013 9 - 2013 DOE OIG Strategic Plan Fiscal Years 2009 - 2013 U.S. Department of Energy Office of Inspector General, Strategic Plan, Fiscal Years 2009 - 2013 This Strategic Plan offers a glance at the Office of the Inspector General's long term effort to work with the Department of Energy's leadership to improve the management and performance of the Department's programs and operations. As OIG implements this Strategic Plan, our objective is to continue to play a critical role in protecting and preserving the Department's assets and resources. OIG will focus on mitigating those management challenges facing the Department through continued collaboration and cooperation with the Secretary and Department senior management. An equally important goal is aggressively exercising our

152

2006 Department of Energy Strategic Plan - Ensuring America's nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ensuring America's Ensuring America's nuclear security 2006 Department of Energy Strategic Plan - Ensuring America's nuclear security In 2000, the National Nuclear Security Administration (NNSA) was established as a new element within the Department in response to a Congressional mandate to reinvigorate the security posture throughout the nuclear weapons program and to reaffirm the Nation's commitment to maintaining the nuclear deterrence capabilities of the United States. NNSA was chartered to better focus management attention on enhanced security, proactive management practices, and mission focus within the Department's national defense and nonproliferation programs. The Department performs its national security mission involving nuclear weapons and nuclear materials and technology through the NNSA.

153

Secretary Chu Unveils the 2011 Strategic Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chu Unveils the 2011 Strategic Plan Chu Unveils the 2011 Strategic Plan Secretary Chu Unveils the 2011 Strategic Plan May 12, 2011 - 1:02pm Addthis Secretary Chu Unveils the 2011 Strategic Plan John Schueler John Schueler Former New Media Specialist, Office of Public Affairs Earlier this week, the Department released its 2011 Strategic Plan, a document that outlines the broad, cross-cutting and collaborative goals that stretch across our complex. It is intended to serve as a blueprint for the Department of Energy to help address the nation's energy, environmental, and nuclear challenges through transformative science and technology solutions. The Strategic Plan is organized into four distinct categories, including: Catalyzing the timely, material and efficient transformation of the nation's energy system and securing U.S. leadership in clean energy

154

Department of Energy Strategic Plan, May 2011, Print Quality | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Strategic Plan, May 2011, Print Quality Department of Energy Strategic Plan, May 2011, Print Quality Department of Energy Strategic Plan, May 2011, Print Quality Posted here are publication materials related to the Department of Energy's Strategic Plan of 2011. DOE_2011-Strategic-Plan_High-Resolution_Print-Quality is a full-data, high-resolution version of the document. This will print/reproduce with the maximum resolution available from your output device (printer). This is a 15.7 Mb file. DOE_2011-Strategic-Plan_Medium-Resolution_Print-Quality is a medium-resolution version of the document. The images have been slightly downsampled and compressed so the file can be easier transmitted. This will print/reproduce at medium resolution on your output device (printer). This is a 3.6 Mb file.

155

Eastern Band of Cherokee Strategic Energy Plan  

SciTech Connect

The Eastern Band of Cherokee Indians was awarded a grant under the U.S. Department of Energy Tribal Energy Program (TEP) to develop a Tribal Strategic Energy Plan (SEP). The grant, awarded under the 揊irst Steps phase of the TEP, supported the development of a SEP that integrates with the Tribe抯 plans for economic development, preservation of natural resources and the environment, and perpetuation of Tribal heritage and culture. The Tribe formed an Energy Committee consisting of members from various departments within the Tribal government. This committee, together with its consultant, the South Carolina Institute for Energy Studies, performed the following activities: Develop the Tribe抯 energy goals and objectives Establish the Tribe抯 current energy usage Identify available renewable energy and energy efficiency options Assess the available options versus the goals and objectives Create an action plan for the selected options

Souther Carolina Institute of energy Studies-Robert Leitner

2009-01-30T23:59:59.000Z

156

FY 2014-2018 DOE IRM Strategic Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2014-39 Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings 2014 - 2018 Strategic Plan Enterprise Architecture Transition Plan - April 2011...

157

TABLE OF CONTENTS 2014 ORNL NEUTRON SCIENCES STRATEGIC PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

TABLE OF CONTENTS 2014 ORNL NEUTRON SCIENCES STRATEGIC PLAN Executive Summary Director's Message Introduction Neutron Scattering User Facilities Comparison with Leading International Neutron Facilities Strategic Planning and Research Community Involvement New Opportunities Science Priorities Introduction Quantum Materials Materials Synthesis and Performance Soft Molecular Matter Biosciences New and Upgraded Capabilities Enabling Technologies Sources Executing the Plan Strategic Timeline Appendices and Acronyms 3 6 17 55 43 51 59 9 3 EXECUTIVE SUMMARY 2014 ORNL NEUTRON SCIENCES STRATEGIC PLAN EXECUTIVE SUMMARY AND DIRECTOR'S MESSAGE * Optimizing existing instrumentation with targeted de-

158

Steps to Developing the New Orleans Strategic Energy Plan (Presentation),  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steps to Developing the New Orleans Strategic Energy Plan Steps to Developing the New Orleans Strategic Energy Plan (Presentation), National Renewable Energy Laboratory (NREL) Steps to Developing the New Orleans Strategic Energy Plan (Presentation), National Renewable Energy Laboratory (NREL) Presented at the New Orleans City Council Utility Subcommittee Meeting, 17 January 2008, New Orleans, Louisiana. 51650.pdf More Documents & Publications Community Greening: How To Develop A Strategic Energy Plan, Energy Efficiency & Renewable Energy (EERE) (Brochure) Rising Above the Water: New Orleans Implements Energy Efficiency and Sustainability Practices Following Hurricanes Katrina and Rita (Fact Sheet), Integrated Deployment: Disaster Recovery (ID) Rising Above the Water: New Orleans Implements Energy Efficiency and

159

State Energy Program Strategic Plan for the 21st Century  

Energy.gov (U.S. Department of Energy (DOE))

Representatives of DOE and the States initiated development of this Strategic Plan to clearly define the program's goals for the next 10 years.

160

Guide to Community Energy Strategic Planning: Step 7  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

alliesfinancial-allies TIP Guide to Community Strategic Energy Planning 7-9 March 2013 - Financing arranged by ESCOs for Energy Savings Performance Contracts (ESPCs) In...

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Government-Wide Diversity and Inclusion Strategic Plan (2011...  

Office of Environmental Management (EM)

diversity and inclusion efforts: workforce diversity, workplace inclusion, and sustainability. The Department of Energy's Diversity and Inclusion Strategic Plan was based off...

162

Microsoft Word - DOE Human Capital Strategic Plan 2011-2015.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE HUMAN CAPITAL STRATEGIC PLAN DOE HUMAN CAPITAL STRATEGIC PLAN FY 2011 - FY 2015 DOE HUMAN CAPITAL STRATEGIC PLAN FY 2011 - FY 2015 TABLE OF CONTENTS EXECUTIVE SUMMARY .................................................................................................................................... 1 SECTION I: MISSION, STRATEGIC PLAN AND PRIORITIES .............................................................................. 2 MISSION ........................................................................................................................................................ 2 DOE STRATEGIC PLAN (DRAFT) ............................................................................................................................ 2

163

Community Greening: How To Develop A Strategic Energy Plan, Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Community Greening: How To Develop A Strategic Energy Plan, Energy Community Greening: How To Develop A Strategic Energy Plan, Energy Efficiency & Renewable Energy (EERE) (Brochure) Community Greening: How To Develop A Strategic Energy Plan, Energy Efficiency & Renewable Energy (EERE) (Brochure) This guide provides an overview of strategic electricity planning for communities, using a step-by-step approach to develop the plan. This method has a high chance of success, because it is based on stakeholder buy-in and political commitment. Not all communities will need to follow all steps, but the process is designed to incorporate all parties, maximize solution-based thinking, and develop a plan that can be carried out by community leaders. 45652.pdf More Documents & Publications Steps to Developing the New Orleans Strategic Energy Plan (Presentation),

164

Strategic Roadmap 2024 and Tactical Action Plan  

SciTech Connect

This chart defines the CRITICAL PATHWAYS described in the Strategic Roadmap and the breakdown of the STRATEGIC TARGET AREAS, providing WORK SCOPE ESTIMATES for each heading.

none,

2014-05-14T23:59:59.000Z

165

January 14 ESTAP Webinar: DOE OE Energy Storage Safety Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE))

On Wednesday, January 14, 2015 from 2:30 - 4 p.m. ET, Clean Energy States Alliance will host a webinar on the OE strategic plan that provides a roadmap for grid energy storage safety, released in December 2014 (link to blog). OE's Imre Gyuk, Energy Storage Program Manager, will present an overview of the strategic plan. Other speakers from Sandia, the National Fire Protection Agency, and PNNL will also present. Registration is required for this free webinar.

166

NANA Strategic Energy Plan & Energy Options Analysis  

SciTech Connect

NANA Strategic Energy Plan summary NRC, as an Alaska Native Corporation, has committed to addressing the energy needs for its shareholders. The project framework calls for implicit involvement of the IRA Councils in the Steering Committee. Tribal Members, from the NRC to individual communities, will be involved in development of the NANA Energy Plan. NRC, as the lead tribal entity, will serve as the project director of the proposed effort. The NRC team has communicated with various governmental and policy stakeholders via meetings and discussions, including Denali Commission, Alaska Energy Authority, and other governmental stakeholders. Work sessions have been initiated with the Alaska Village Electric Cooperative, the NW Arctic Borough, and Kotzebue Electric Association. The NRC Strategic Energy Plan (SEP) Steering committee met monthly through April and May and weekly starting in June 2008 in preparation of the energy summit that was held from July 29-31, 2008. During preparations for the energy summit and afterwards, there was follow through and development of project concepts for consideration. The NANA regional energy summit was held from July 29-31, 2008, and brought together people from all communities of the Northwest Arctic Borough. The effort was planned in conjunction with the Alaska Energy Authority抯 state-wide energy planning efforts. Over $80,000 in cash contributions was collected from various donors to assist with travel from communities and to develop the summit project. Available funding resources have been identified and requirements reviewed, including the Denali Commission, U.S. Dept. of Agriculture, and the Alaska Energy Authority. A component of the overall plan will be a discussion of energy funding and financing. There are current project concepts submitted, or are ready for submittal, in the region for the following areas: Wind-diesel in Deering, Buckland, Noorik, and Kiana areas; potential development around Red Dog mine. Biomass Feasibility analysis in the upper Kobuk; Run of the river hydroelectric development for the Upper Kobuk; Solar photovoltaic (PV) power demonstration projects for Noatak, Ambler, Selawik, Kiana, and Noorvik; Heat Recovery for several communities; In September 2008, the NRC team participated at the Alaska Rural Energy Conference in Girdwood, Alaska In November 2008, the NRC team gave a presentation on the NANA regional energy plans at a DOE Tribal Energy Program conference in Denver, Colorado. In January 2009, the final SEP report was submitted to NRC.

Jay Hermanson; Brian Yanity

2008-12-31T23:59:59.000Z

167

PROJECT MANAGEMENT PLANS Project Management Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans 飩 Overview 飩 Project Management Plan Suggested Outline Subjects 飩 Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements 飩 Elements of Deactivation Project Planning 飩 Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

168

Warner College of Natural Resources 2005-2010 Strategic Plan  

E-Print Network (OSTI)

of renewable and non-renewable resources. #12;SOCIETAL GOALS Human dimensions (human understandingWarner College of Natural Resources 2005-2010 Strategic Plan Executive Summary #12;WARNER COLLEGE OF NATURAL RESOURCES 2005-2010 STRATEGIC PLAN Executive Summary Our Vision To be the global leader

169

Working Together to Save Lives National Weather Service Strategic Plan  

E-Print Network (OSTI)

Working Together to Save Lives National Weather Service Strategic Plan for 2005-2010 #12;i Preface for a broader range of environmental information services. NOAA's National Weather Service (NWS) Strategic Plan strategies, and a list of partners helping us with our activities. An appendix provides metrics NWS uses

170

Civil & Environmental EngineeringStrategic Plan 2014-2018  

E-Print Network (OSTI)

Civil & Environmental EngineeringStrategic Plan 2014-2018 College of Engineering, Architecture & Technology #12;Strategic Plan 2014-2018 Civil and Environmental Engineering at Oklahoma State University started in 1906. Civil and environmental engineers spend their careers dealing with infrastructure

Piao, Daqing

171

Sustainability Strategic Plan 20132016 At Yale, we believe that  

E-Print Network (OSTI)

Sustainability Strategic Plan 2013颅2016 At Yale, we believe that sustainability depends us to even more innovation. We have a responsibility to future generations to ensure that sustainable Sustainability Strategic Plan 2013颅2016 #12;Letter from President Peter Salovey At Yale, we believe

172

EHSS Strategic Plan 2015 - 2018 | Department of Energy  

Energy Savers (EERE)

Before the Subcommittee on Strategic Forces - House Armed Services Committee Outreach and Collaboration Program Status and Accomplishments 2008-2009 Safety Management System Policy...

173

Department of Energy Releases 2011 Strategic Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Releases 2011 Strategic Plan Releases 2011 Strategic Plan Department of Energy Releases 2011 Strategic Plan May 10, 2011 - 12:00am Addthis Media contact(s): (202) 586-4940 Washington, D.C. - The Department of Energy today released its 2011 Strategic Plan (pdf - 3.46MB), a comprehensive blueprint to guide the agency's core mission of ensuring America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. In the opening of the DOE Strategic Plan, Secretary Chu writes: "The Department of Energy plays an important and unique role in the U.S. science and technology community. The Department's missions and programs are designed to bring the best scientific minds and capabilities to bear on important problems. It is an integrator, bringing together diverse

174

Department of Energy Releases Strategic Plan to Address Energy Challenges |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Releases Strategic Plan to Address Energy Department of Energy Releases Strategic Plan to Address Energy Challenges Department of Energy Releases Strategic Plan to Address Energy Challenges October 2, 2006 - 9:01am Addthis WASHINGTON, DC - Secretary of Energy Samuel W. Bodman today released the Department's five-year strategic plan that focuses on the Department's role in powering and securing America's future. The plan addresses overall Department goals for developing and deploying new clean energy technologies, reducing our dependence on foreign energy sources, protecting our nuclear weapons stockpile, and ensuring that America remains competitive in the global marketplace. The Department's plan builds on President Bush's Advanced Energy and American Competitiveness Initiatives, which are increasing America's energy security, spurring scientific

175

Strategic Plan Information Resources Management  

E-Print Network (OSTI)

for Information Technology Approved: _________________________________________ Dr. David Schmidly, President, Strategies, and Programs 3 Table 2: Agency Databases 8 Table 3: Agency Applications 10 Table 4: Information university, provides the highest standards of excellence in higher education, fosters intellectual

Gelfond, Michael

176

The UC Berkeley Strategic Academic Plan: Five-Year Review  

E-Print Network (OSTI)

The UC Berkeley Strategic Academic Plan: Five-Year Review A Report to the Chancellor by the Office://www.berkeley.edu/news/media/releases/2003/05/sap/plan.pdf. A one-year review was done in 2003. This five-year review provides to complete (Strategic Plan). The current standard is 18 months; the average time is closer to 25 months

Jacobs, Lucia

177

Environmental Management System Plan  

E-Print Network (OSTI)

R-3 Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

178

Coal Power Systems strategic multi-year program plans  

SciTech Connect

The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

None

2001-02-01T23:59:59.000Z

179

Presentation to the EAC - Strategic Plan for DOE OE - Peter Bonner (Bill Parks)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Strategic Planning Process As Is/Situation Assessment Mission, Vision & Values Strategic Challenges Strategic Options/Choices Uncertainties/ Scenarios/ Constraints Strategic Goals, Objectives,& Actions Performance Measures & Accountability Strategic Plan Phase 2: Integration of Strategic Plan DOE-OE Strategic Planning Outcomes * Adaptive strategies and plans to lead OE into a sustainable future with clear performance indicators * External leadership in R&D, security, permitting/siting, and analytics/modeling * Internal clarity on OE strengths, cross-OE/DOE/government partnerships, organization capacity, and emerging leaders * Strategic direction, priorities, and commitment of resources consistent with direction and priorities * Alignment with tacit and explicit DOE mission and strategy

180

Microsoft Word - ESnet Strategic Plan - March 2 2013.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

! ! Strategic!Plan! FY20143FY2023! ESnet! ! March!1,!2013! ! ! ! ! ! ! ! ! This!work!was!supported!by!the!Director,!Office!of!Science,!Office!of!Advanced!! Scientific!Computing!Research!of!the!U.S.!Department!of!Energy!under!Contract!No.!DECAC02C05CH11231. ! ! Table&of&Contents& 1.&Facility&Overview&................................................................................................................&1! 2.&Mission,&Goals,&Drivers,&and&Strategic&Connections&.............................................................&4! 2.1!Vision!and!Mission!Statements!....................................................................................................................................!4! 2.2!Facility!Strategic!Goals!.....................................................................................................................................................!4!

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

 U.S. Department of Energy Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy Strategic Plan U.S. Department of Energy Strategic Plan the DePaRtment of eneRGy stRateGIc Plan The Department of Energy (DOE) has a rich and diverse history with its lineage tracing back to the Manhattan Project and the race to develop an atomic bomb during World War II. Following that war, Congress created the Atomic Energy Commission (1946) to take control over the scientific and industrial complex supporting the Manhattan Project and to maintain civilian government control over atomic research and development. The Department of Energy Organization Act, which created DOE, was enacted in 1977 and DOE officially

182

Office of UNF Disposition International Program - Strategic Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UNF Disposition International Program - Strategic Plan UNF Disposition International Program - Strategic Plan Office of UNF Disposition International Program - Strategic Plan The Department of Energy's Office of Nuclear Energy, Used Nuclear Fuel Disposition Research and Development Office (UFD), performs the critical mission of addressing the need for an integrated strategy that combines safe storage of spent nuclear fuel with expeditious progress toward siting and licensing a disposal facility or facilities. The UFD International Program plays a key role in this effort. International collaboration provides a forum for exchanging strategies, expertise, and technologies with other nations that have also been investigating solutions to the problems of nuclear waste disposal-information that otherwise would have

183

DOE Releases Climate Change Technology Program Strategic Plan | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Releases Climate Change Technology Program Strategic Plan Releases Climate Change Technology Program Strategic Plan DOE Releases Climate Change Technology Program Strategic Plan September 20, 2006 - 9:01am Addthis Plan Outlines Strategies for Reducing Greenhouse Gas Emissions through Development and Deployment of Advanced Technologies WASHINGTON, DC - The U.S. Department of Energy (DOE) today released the Climate Change Technology Program (CCTP) Strategic Plan, which details measures to accelerate the development and reduce the cost of new and advanced technologies that avoid, reduce, or capture and store greenhouse gas emissions. CCTP is the technology component of a comprehensive U.S. strategy introduced by President Bush in 2002 to combat climate change that include measures to slow the growth of greenhouse gas emissions through

184

DOE Strategic Plan | OSTI, US Dept of Energy, Office of Scientific and  

Office of Scientific and Technical Information (OSTI)

DOE Strategic Plan DOE Strategic Plan The U.S. Department of Energy recently released its 2011Strategic Plan (3.46MB - PDF), a comprehensive blueprint to guide the agency's core mission of ensuring America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. The plan states, as part of the DOE effort to assure excellence in R&D management, project success should be measured when scientific and technical information is disseminated. From the plan: Disseminate our Results: "Our success should be measured not when a project is completed or an experiment concluded, but when scientific and technical information is disseminated. Beyond broad availability of technical reports, e-prints and multimedia, and publication in peer-reviewed

185

Management and Performance PERFORMANCE REPORTING AND PLANNING  

E-Print Network (OSTI)

AND PLANNING M&P-144 the Agency's workforce is well informed of major Agency initiatives and human capitalManagement and Performance PERFORMANCE REPORTING AND PLANNING M&P-143 Strategic Goal 5: Enable.1: IDENTIFY, CULTIVATE, AND SUSTAIN A DIVERSE WORKFORCE AND INCLUSIVE WORK ENVIRONMENT THAT IS NEEDED

186

Global Nuclear Energy Partnership Strategic Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Global Nuclear Energy Partnership Strategic Plan Global Nuclear Energy Partnership Strategic Plan Global Nuclear Energy Partnership Strategic Plan A report describing the United States Global Nuclear Energy Partnership which: "will build the Global Nuclear Energy Partnership to work with other nations to develop and deploy advanced nuclear recycling and reactor technologies. This initiative will help provide reliable, emission-free energy with less of the waste burden of older technologies and without making available separated plutonium that could be used by rogue states or terrorists for nuclear weapons. These new technologies will make possible a dramatic expansion of safe,clean nuclear energy to help meet the growing global energy demand." Global Nuclear Energy Partnership Strategic Plan

187

Tribal Renewable Energy Foundational Course: Strategic Energy Planning  

Energy.gov (U.S. Department of Energy (DOE))

Watch the U.S. Department of Energy Office of Indian Energy foundational course webinar on Strategic Energy Planning by clicking on the .swf link below. You can also download the PowerPoint slides...

188

Guide to Community Energy Strategic Planning: Step 6  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) Solution Center publishes this strategic energy planning guide for state and local governments. This links to Step 6.

189

Guide to Community Energy Strategic Planning: Step 5  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) Solution Center publishes this strategic energy planning guide for state and local governments. This links to Step 5.

190

Guide to Community Energy Strategic Planning: Step 1  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) Solution Center publishes this strategic energy planning guide for state and local governments. This links to Step 1.

191

Guide to Community Energy Strategic Planning: Step 4  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) Solution Center publishes this strategic energy planning guide for state and local governments. This links to Step 4.

192

Guide to Community Energy Strategic Planning: Step 9  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) Solution Center publishes this strategic energy planning guide for state and local governments. This links to Step 9.

193

Guide to Community Energy Strategic Planning: Step 7  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) Solution Center publishes this strategic energy planning guide for state and local governments. This links to Step 7.

194

How does fuel price uncertainty affect strategic airline planning?  

Science Journals Connector (OSTI)

Today, jet fuel costs are a growing part in airlines ... fluctuations. Therefore, airlines think about minimizing jet fuel costs and counteracting fuel price uncertainty. The strategic flight planning highly det...

Marc Naumann; Leena Suhl

2013-10-01T23:59:59.000Z

195

U.S. Department of Energy 2012 Strategic Sustainability Performance Plan  

Office of Energy Efficiency and Renewable Energy (EERE)

This document details the U.S. Department of Energy's 2012 strategic sustainability performance plan.

196

Strategic Plan 2012-2015 Progress Review 2012 2013  

E-Print Network (OSTI)

Strategic Plan 2012-2015 Progress 颅 Review 2012 颅 2013 Academic Units Department of Construction Therapy School of Education School of Social Work #12;Plan 2012-2015 Progress 颅 Review 2012-2013 Page 2 in some programs. #12;Plan 2012-2015 Progress 颅 Review 2012-2013 Page 3 of 40 Goals and Objectives Lead

197

Plan - Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Plan Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Plans NASA's Terrestrial Ecology Program now requires that each proposal include a Data Management Plan (DMP) of up to two pages. A DMP for a proposal is a brief document that outlines what you will do with your data during and after your research, to ensure your data will be safe, documented, and accessible now and in the future. A DMP - developed early and used throughout the research project - will increase research efficiency by making the data understandable and usable in the future and

198

Artificial neural network: an upcoming strategic decision planning support tool  

Science Journals Connector (OSTI)

Finding a reliable technique to help in the strategic planning is not a new research issue. Past studies, using several techniques and models, have shown only limited progress. Existing techniques are either too complex and time-consuming or too unreliable for full-scale adoption. Artificial neural network (ANN) technology seems capable of overcoming most of these shortcomings. This paper overviews existing techniques: the strategic-fit concept, CAPM, traditional DSS, and expert systems and contrasts them with ANN. An illustrative application is used to demonstrate the effectiveness of ANN in supporting a diversification strategic planning.

Godwin J. Udo

1998-01-01T23:59:59.000Z

199

Microsoft Word - FINAL DOE IRM Strategic Plan_2009-2011_090808.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

IRM Strategic Plan IRM Strategic Plan Office of the Chief Information Officer FY 2009 - 2011 DOE IRM Strategic Plan i FY 2009 - 2011 U.S. Department of Energy IRM Strategic Plan Office of the Chief Information Officer FY 2009 - 2011 DOE IRM Strategic Plan i TABLE OF CONTENTS MESSAGE FROM THE CHIEF INFORMATION OFFICER ..................................................................3 1.0 INTRODUCTION ..........................................................................................................................................4 2.0 IT STRATEGY OVERVIEW ........................................................................................................................4 2.1 DEPARTMENT OF ENERGY MISSION..........................................................................................

200

Department of Energy Strategic Plan, May 2011 - Medium Resolution Printing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 MAY 2011 iii STRATEGIC PLAN U.S. DEPARTMENT OF ENERGY STRATEGIC PLAN MAY 2011 DOE/CF-0067 iv U.S. Department of Energy v STRATEGIC PLAN Mission and Goals The mission of the Department of Energy is to ensure America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. Goal 1: Catalyze the timely, material, and efficient transformation of the nation's energy system and secure U.S. leadership in clean energy technologies. Goal 2: Maintain a vibrant U.S. effort in science and engineering as a cornerstone of our economic prosperity with clear leadership in strategic areas. Goal 3: Enhance nuclear security through defense, nonproliferation, and environmental efforts.

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Department of Energy Strategic Plan, May 2011 - High Resolution Printing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 MAY 2011 iii STRATEGIC PLAN U.S. DEPARTMENT OF ENERGY STRATEGIC PLAN MAY 2011 DOE/CF-0067 iv U.S. Department of Energy v STRATEGIC PLAN Mission and Goals The mission of the Department of Energy is to ensure America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. Goal 1: Catalyze the timely, material, and efficient transformation of the nation's energy system and secure U.S. leadership in clean energy technologies. Goal 2: Maintain a vibrant U.S. effort in science and engineering as a cornerstone of our economic prosperity with clear leadership in strategic areas. Goal 3: Enhance nuclear security through defense, nonproliferation, and environmental efforts.

202

Community Greening: How to Develop a Strategic Plan | Open Energy  

Open Energy Info (EERE)

Greening: How to Develop a Strategic Plan Greening: How to Develop a Strategic Plan Jump to: navigation, search Name Community Greening: How to Develop a Strategic Plan Agency/Company /Organization National Renewable Energy Laboratory Focus Area People and Policy Phase Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, "Evaluate Effectiveness and Revise As Needed" is not in the list of possible values (Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes, Evaluate Effectiveness and Revise as Needed) for this property.

203

FIRE MANAGEMENT PLAN MONTAGUE PLAIN  

E-Print Network (OSTI)

FIRE MANAGEMENT PLAN FOR MONTAGUE PLAIN WILDLIFE MANAGEMENT AREA #12;Fire Management Plan for Montague Plain Wildlife Management Area prepared for Massachusetts Dept. of Fisheries, Wildlife. 2003. Fire Management Plan for Montague Plain Wildlife Management Area. Department of Natural Resources

Schweik, Charles M.

204

Strategic Plan Table of Contents-IG Ltr 3-22.pub  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Years 2003 - 2008 Years 2003 - 2008 U . S . D e p a r t m e n t o f E n e r g y Office of Inspector General DOE/IG-000SP/03 STRATEGIC PLAN in Government" "Promoting Message from the Inspector General We are pleased to present the Office of Inspector General's (OIG) Strategic Plan covering Fiscal Years 2003 - 2008. This plan represents our vision and strong commitment for improving the management and performance of the Department of Energy's many programs and operations. The OIG plays a key role in assisting the Department's senior management and the Congress by identifying opportunities to improve program performance and enhance accountability. The OIG seeks to further serve as a catalyst for management reform by evaluating the Department's performance in relation to the President's Management Initiatives and the Secretary of Energy's priorities. On

205

Energy Department Releases Strategic Plan for Energy Storage Safety  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Electricity Delivery and Energy Reliability (OE) has worked with industry and other stakeholders to develop the Energy Storage Safety Strategic Plan, a roadmap for grid energy storage safety that highlights safety validation techniques, incident preparedness, safety codes, standards, and regulations. The Plan, which is now available for downloading, also makes recommendations for near- and long-term actions. The Energy Storage Safety Strategic Plan complements two reports released by OE earlier this year: the Overview of Development and Deployment of Codes, Standards and Regulations Affecting Energy Storage System Safety in the United States and the Inventory of Safety-related Codes and Standards for Energy Storage Systems.

206

Fusion Energy for Power Production: Status Assessment, Identification of Challenges and Strategic Plan for Commercialization  

E-Print Network (OSTI)

1 Fusion Energy for Power Production: Status Assessment, Identification of Challenges and Strategic in the Technical Assessment Committee (TAC) and 4) EPRI being the Program Manager for the project. Establish Plan for Commercialization March 2011 Phase I. Status Assessment and Identification of Challenges

207

DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Releases Draft Strategic Plan for Reducing Greenhouse Gas Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions through Deployment of Advanced Technology DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions through Deployment of Advanced Technology September 22, 2005 - 10:45am Addthis WASHINGTON, DC - The Department of Energy today released for public review and comment a plan for accelerating the development and reducing the cost of new and advanced technologies that avoid, reduce, or capture and store greenhouse gas emissions - the technology component of a comprehensive U.S. approach to climate change. The technologies developed under the Climate Change Technology program will be used and deployed among the United States' partners in the Asia-Pacific Partnership for Clean Development that was announced earlier this year.

208

East Tennessee State University TBR Strategic Planning 2005-2010  

E-Print Network (OSTI)

East Tennessee State University TBR Strategic Planning 2005-2010 GOAL 1. LEADERSHIP LEADERSHIP Planning Priority. The Tennessee Board of Regents System will provide leadership in promoting educational toward enhancing workforce development, 路 commitment to civic involvement that builds on a history

Karsai, Istvan

209

Bottling Electricity: Storage as a Strategic Tool for Managing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bottling Electricity: Storage as a Strategic Tool for Managing Variability and Capacity Concerns in the Modern Grid - EAC Report (December 2008) Bottling Electricity: Storage as a...

210

Best Management Practice #1: Water Management Planning  

Energy.gov (U.S. Department of Energy (DOE))

A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

211

Guide to Community Energy Strategic Planning: Introduction  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy%20Plan1.pdf Boulder, CO - Climate Action Plan www.bouldercolorado.govindex.php?optioncomcontent&viewarticle&id15356&Itemid2150 Chicago, IL - Chicago Climate...

212

2006 Department of Energy Strategic Plan - Environmental Responsibility |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2006 Department of Energy Strategic Plan - Environmental 2006 Department of Energy Strategic Plan - Environmental Responsibility 2006 Department of Energy Strategic Plan - Environmental Responsibility The scope of the Department's environmental cleanup includes stabilization and disposition of some of the earth's most hazardous materials generated from spent nuclear fuel and nuclear radioactive waste material. The cleanup program resulting from over five decades of nuclear weapons production and energy research is the largest active cleanup program in the world. In addition, after active cleanup, residual risks will remain for significant periods of time at most DOE cleanup sites. The Department will take appropriate action to protect human health and the environment from these residual risks. The Department continues its effort

213

2006 Department of Energy Strategic Plan - Scientific Discovery and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Strategic Plan - Scientific Discovery and Department of Energy Strategic Plan - Scientific Discovery and Innovation 2006 Department of Energy Strategic Plan - Scientific Discovery and Innovation The United States has always been a Nation of innovators and the Department of Energy has been a major contributor to that legacy. DOE-supported basic research has produced Nobel Laureates, numerous paradigm-shifting scientific discoveries, and revolutionary technologies that have spawned entirely new industries. Such breakthroughs have created fundamentally new energy options, underpinned U.S. national security during challenging times, and contributed to the health of our citizenry and the stewardship of our Nation's environmental resources. This great engine of U.S. innovation has played an important role in fueling a strong economy and one

214

Strategic Plan for Light Water Reactor Research and Development  

SciTech Connect

The purpose of this strategic plan is to establish a framework that will allow the Department of Energy (DOE) and the nuclear power industry to jointly plan the nuclear energy research and development (R&D) agenda important to achieving the Nation's energy goals. This strategic plan has been developed to focus on only those R&D areas that will benefit from a coordinated government/industry effort. Specifically, this plan focuses on safely sustaining and expanding the electricity output from currently operating nuclear power plants and expanding nuclear capacity through the deployment of new plants. By focusing on R&D that addresses the needs of both current and future nuclear plants, DOE and industry will be able to take advantage of the synergism between these two technology areas, thus improving coordination, enhancing efficiency, and further leveraging public and private sector resources. By working together under the framework of this strategic plan, DOE and the nuclear industry reinforce their joint commitment to the future use of nuclear power and the National Energy Policy's goal of expanding its use in the United States. The undersigned believe that a public-private partnership approach is the most efficient and effective way to develop and transfer new technologies to the marketplace to achieve this goal. This Strategic Plan is intended to be a living document that will be updated annually.

None

2004-02-01T23:59:59.000Z

215

Policy Flash 2014-39 Initiatives to Achieve Strategic Plan 2014...  

Energy Savers (EERE)

2014-39 Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings Policy Flash 2014-39 Initiatives to Achieve Strategic Plan 2014-2018...

216

Steps to Developing the New Orleans Strategic Energy Plan (Presentation)  

SciTech Connect

This presentation was given by NREL's Elizabeth Doris (Brown) to the New Orleans City Council in January 2008. NREL was funded by DOE to provide technical assistance to New Orleans after Hurricanes Katrina and Rita. The presentation provides an overview of strategic energy planning, case studies, and suggested next steps for implementing energy efficiency and renewable energy into the city's rebuilding efforts.

Brown, E.

2011-01-01T23:59:59.000Z

217

Extension Strategic Plan 1 GUIDELINES FOR DECISION-MAKING  

E-Print Network (OSTI)

education with organizational efficiency and accountability. In the changing and competitive global organizational capacity to reach these goals, but that we set the stage for the kind of transformative change and understanding. The Strategic Plan articulates a shared purpose that builds upon existing organizational

Netoff, Theoden

218

University of Idaho Library Strategic Plan 2011-2015  

E-Print Network (OSTI)

In 5 years, the library will increase the use of collaborative work space by 50%. Create tiered libraryUniversity of Idaho Library Strategic Plan 2011-2015 Vision The University of Idaho Library collaborates with leading land-grant and flagship libraries to shape modern academic librarianship

O'Laughlin, Jay

219

Physics and Astronomy Department Strategic Plan March 1, 2011  

E-Print Network (OSTI)

Physics and Astronomy Department Strategic Plan March 1, 2011 Executive Summary The Department of Physics & Astronomy performs world-class research and provides state-of-the-art training for students in astronomy, astrophysics, and gravitational physics; atomic/molecular/optical physics, quantum optics

Harms, Kyle E.

220

Environmental Restoration Program Roadmap: Strategic program plan. Addendum 1  

SciTech Connect

This Addendum to the Portsmouth (PORTS) Environmental Restoration (ER) Roadmap expands on the FY 1992 strategic plan for PORTS by providing human resource loading, ADS linkages to resolution activities, and technology development information. Each of these topics is presented in a separate section.

none,

1992-12-11T23:59:59.000Z

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Student Judicial Programs 2010-2011 Strategic Plan  

E-Print Network (OSTI)

Student Judicial Programs 2010-2011 Strategic Plan Updated: August 19, 2010 Mission Promoting Student Success Vision Student Judicial Programs will challenge students to become active participants and educationally adjudicating alleged violations of the Code of Student Conduct. Values As a member of the campus

Rock, Chris

222

The University of Connecticut Libraries Strategic Plan 2009 -2014  

E-Print Network (OSTI)

1 The University of Connecticut Libraries Strategic Plan 2009 - 2014 As of 9/25/2009 4:01 PM #12 of Connecticut Libraries will be a vital component of the virtual and physical "information commons" supporting the academic needs of our diverse campus communities, the citizens of Connecticut, and scholarship worldwide

Holsinger, Kent

223

CEHS Technology Committee Strategic Plan March 1, 2012  

E-Print Network (OSTI)

CEHS Technology Committee Strategic Plan 2012-13 March 1, 2012 Thomas Carrell 颅 Special Education Gina Causin 颅 Nutrition and Health Sciences Mary Sutton 颅 Technology Services Jessica Hustad 颅 Staff Council Al Steckelberg - CEHS Technology Committee Chair #12;Mission Statement Knowledge

Farritor, Shane

224

Best Practices in Developing a Tribal Strategic Energy Plan  

Energy.gov (U.S. Department of Energy (DOE))

This webinar on Jan. 28, 2015 from 11 a.m. to 12:30 p.m. will cover strategic energy plans. Attendees will learn from experts who have overcome typical barriers and used community participation to gain support and ownership.

225

2010 U.S. Department of Energy Strategic Sustainability Performance Plan  

Office of Energy Efficiency and Renewable Energy (EERE)

2010 U.S. Department of Energy Strategic Sustainability Performance Plan developed as required by Executive Order 13514.

226

2011 U.S. Department of Energy Strategic Sustainability Performance Plan  

Office of Energy Efficiency and Renewable Energy (EERE)

2011 U.S. Department of Energy Strategic Sustainability Performance Plan developed as required by Executive Order 13514.

227

Roadmapping - A Tool for Strategic Planning and Leveraging R&D completed by other Agencies  

SciTech Connect

The Department of Energy (DOE) is responsible for management of the environmental legacy of the nation's nuclear weapons and research program. This is the largest, most complex environmental cleanup program in the world. The issues and problems encountered in this program create the need to develop many scientific and technological solutions. To be effective, the process used to create these solutions must be well coordinated through DOE's Environmental Management program, the rest of DOE, and other Federal agencies. Roadmapping is one strategic planning tool to provide the needed coordination. Past roadmapping accomplishments include: (1) Issuance of the Draft EM Roadmapping Guidance; (2) Issuance of the EM R&D Program Plan and Strategic Plan which established the direction for Roadmapping; (3) Issuance of the OST Management Plan which calls out Roadmapping as a key tool in EM Research & Development (R&D) Strategic Planning; (4) Completion of or progress on key EM Roadmaps, i.e., Savannah River High Level Waste (HLW) Salt Dispositioning Roadmaps, Hanford Groundwater/Vadose Zone Roadmap, Robotics and Intelligent Machines Critical Technology Roadmap, Complex-Wide Vadose Zone Roadmap, Long-Term Stewardship Preliminary Roadmap, Hydrogen Gas Generation R&D Plan (Roadmap), Idaho National Engineering and Environmental Laboratory (INEEL) Sodium Bearing Waste Dispositioning Roadmap, INEEL Voluntary Consent Order Tanks Characterization Roadmap, INEEL Vadose Zone/Groundwater Roadmap, Calcine Treatment Alternatives Roadmap. These efforts represent a great start; however, there is more to be accomplished in using Roadmapping as a tool for planning strategic initiatives and in coordinating the R&D performed by multiple federal agencies.

Collins, J. W.

2002-02-28T23:59:59.000Z

228

Penobscot Indian Nation's Strategic Energy Planning Efficiency on tribal Lands  

SciTech Connect

The energy grant provided the resources to evaluate the wind, hydro, biomass, geothermal and solar resource potential on all Penobscot Indian Naiton's Tribal lands. The two objectives address potential renewable energy resources available on tribal lands and energy efficiency measures to be taken after comprehensive energy audits of commercial facilities. Also, a Long Term Strategic Energy Plan was developed along with a plan to reduce high energy costs.

Sockalexis, Mike; Fields, Brenda

2006-11-30T23:59:59.000Z

229

Strategic Energy and Sustainability Planning in El Paso, Texas  

Energy.gov (U.S. Department of Energy (DOE))

Presentation at the January 27, 2010 TAP Webinar by Alexander Dane and Brian Levite of the DOE National Renewable Energy Laboratory on strategic energy planning and sustainability planning, with a case study from the City of El Pasto, Texas. The Webinar was sponsored by the DOE Technical Assistance Project (TAP) for state and local officials under the auspices of the DOE Office of Energy Efficiency and Renewable Energy.

230

National Center for Combating Terrorism Strategic Plan, September 2003  

SciTech Connect

National Center for Combating Terrorism Strategic Plan is to document the mission, vision, and goals for success; define the build plan; and describe initiatives that support the U.S. Department of Homeland Security, U.S. Department of Defense, U.S. Department of Energy, U.S. Department of Justice, intelligence community, National Governors Association, and other organizations or departments with combating terrorism training, testing, and technology responsibilities.

Bechtel Nevada

2003-09-01T23:59:59.000Z

231

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan  

E-Print Network (OSTI)

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Compiled by Wasco County Soil and Water Conservation District in cooperation with Fifteenmile Coordinating Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN

232

Report: EM Management Analysis and Strategic Vision-Casting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Analysis and Strategic Vision-Casting Management Analysis and Strategic Vision-Casting September 25, 2008 Submitted by the EMAB Strategic Vision-Casting Subcommittee Background: In the course of developing the Environmental Management Advisory Board's (EMAB) fiscal year (FY) 2008 review topics, EM leadership and Board members recognized a need to re-examine the program's strategy and vision for the future, in order to better position EM and continue its momentum for clean-up and closure. This endeavor will also ensure that the next administration and current stakeholders are aligned with EM's proposed priorities, funding requirements, and commitments for 2009 and beyond. Consequently, the Board formed a Strategic Vision-Casting Subcommittee that was charged with the assignment of reviewing EM's current and past missions and strategic visions to assess

233

Input to the 2012-2021 Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Related Federal Climate Efforts Related Federal Climate Efforts Input to the 2012-2021 Strategic Plan Print E-mail Engaging Stakeholders The USGCRP is dedicated to engaging stakeholders in strategic planning efforts. Our community outreach activities created a dialogue with our stakeholders through various communication channels, such as opportunities for interagency collaboration, town hall meetings, public presentations and listening sessions. These channels alongside our 60 day public comment period enabled the program to incorporate stakeholder input int the process of drafting this decadal plan. In addition, we welcome input - particularly on the future direction of USGCRP and on the climate information you need and use. Please send your comments to input@usgcrp.gov. Listening Sessions

234

RHIC Mid-Term Strategic Plan: 2006-2011  

NLE Websites -- All DOE Office Websites (Extended Search)

Mid-Term Strategic Plan: 2006-2011 Mid-Term Strategic Plan: 2006-2011 For the Relativistic Heavy Ion Collider At Brookhaven National Laboratory Prepared by Brookhaven National Laboratory With the RHIC Scientific Community For the U.S. Department of Energy February 14, 2006 1 Table of Contents 1. Introduction............................................................... 3 1.1 BNL's vision for RHIC 1.2 Mid-Term strategy - motivation and overview 2. The science case for the future ....................................... 9 2.1 Discoveries in the first five years 2.2 Implications for the future program at RHIC 2.3 Exploring QCD matter 2.4 Gluon saturation 2.5 The spin structure of the nucleon 2.6 Physics goals for the mid-term 3. The mid-term run plan: 2006 - 2011................................ 24

235

Department of Energy Hydrogen and Fuel Cells Program Plan An Integrated Strategic Plan for the  

E-Print Network (OSTI)

Department of Energy Hydrogen and Fuel Cells Program Plan An Integrated Strategic Plan Program Plan The need for clean, sustainable, and domestically produced energy has never been greater Act).The Department of Energy (DOE) is responding to this challenge, collaborating with industry

236

Integrated Planning and Performance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

management systems need clarification - Consolidated planning annual timetable needed for efficiency * Organizational rolesresponsibilities need alignment to defined planning...

237

NNSA Strategic Performance Evaluation Plan (PEP) FOR  

National Nuclear Security Administration (NNSA)

Management and Operation of the Management and Operation of the Babcock and Wilcox Technical Services Y-12, LLC Contract Number: DE-ACOS-OOOR22800 Performance period: October 01, 2012 through September 30, 2013 . Spencer Date President and General Manager Babcock & Wilcox Technical Services Y-12, LLC jO/~ nag , Contracts & Special Initiatives ck & Wilcox Technical Services Y -12, LLC National Nuclear Security Administration INTRODUCTION Y-12 National Security Complex is managed by Babcock & Wilcox Technical Services Y-12, LLC, herein referenced as "Contractor", for the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). Pursuant to the terms and conditions of the Contract, and Clause 1.154 DEAR 970.5215-1 Total Available Fee: Base Fee Amount and Performance

238

2013 Strategic Sustainability Performance Plan | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Management and Budget, June 2013, by the U.S. Department of Energy. doesspp2013.pdf More Documents & Publications FY 2006 Executive Order 13101 Report: Department of...

239

Aspen, Colorado: Community Energy Strategic Planning Process  

Energy.gov (U.S. Department of Energy (DOE))

This presentation features Lee Ledesma, utilities operations manager with the City of Aspen, Colorado. Ledesma provides an overview of the City of Aspen's experience in putting together a financing...

240

DOE Awards Management and Operating Contract for DOE's Strategic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Awards Management and Operating Contract for DOE's Strategic DOE Awards Management and Operating Contract for DOE's Strategic Petroleum Reserve DOE Awards Management and Operating Contract for DOE's Strategic Petroleum Reserve September 18, 2013 - 5:11pm Addthis WASHINGON, D. C. - After conducting a rigorous competitive selection process, the U.S. Department of Energy (DOE) today announced that Fluor Federal Petroleum Operations, LLC (team includes members comprised of Parent Company Fluor Federal Services, Inc., of Arlington, Virginia and major subcontractors MRIGlobal of Kansas City, Missouri; Booz Allen Hamilton of Mclean, Virginia; and ASRC Petroleum Operations and Maintenance of Anchorage, Alaska) has been awarded a management and operating contract valued at $1.46 billion to run DOE's Strategic Petroleum Reserve (SPR)

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

www.nasa.gov Strategic Plan  

E-Print Network (OSTI)

panels retracted into the shadows of its protective solar shield, approaches the Sun in this artist's con, an environment able to support microbial life. (Credit: NASA/JPL颅Caltech) Solar Probe Plus, its primary solar- cept. Managed by the Goddard Space Flight Center, Solar Probe Plus will repeatedly sample the near

Waliser, Duane E.

242

Improving Lives. Improving Texas. Agency Strategic Plan  

E-Print Network (OSTI)

. Williams Administration Building 7101 TAMU September 2009 College Station, TX 77843-7101 Phone: 979. In the context of this broad mission, the priorities for Extension education are: Ensure a sustainable and management. Build local capacity for economic development in Texas communities. Improve the health

243

Test Methods Standing Technical Committee Strategic Plan - February 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Test Methods Standing Technical Committee Test Methods Standing Technical Committee 2011 Strategic Plan V1.1 - Draft 2/24/2012 Committee Chair: 2011-2012 Dane Christensen National Renewable Energy Laboratory 2 Prioritization of Gaps, Barriers and Needs The following table prioritizes the Gaps, Barriers and Needs described in this document. Rank Description Estimated Priority Effort 1 Heat Pump Water Heater Field Test Protocol H M 2a Method for infinitely variable fan airflow measurement H H 2b Non-Intrusive Natural Gas Flow Measurement H H 3 Data Logger with Increased Data Capabilities M M 4 Room Air Mixing Analysis M H Contents Summary of Test Methods STC Strategic Plan .......................................................................................................... 3

244

Department of Energy Strategic Plan, May 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

radiological emergency response capabilities, assess foreign radiological emergency response capabilities, assess foreign nuclear weapons development programs, and analyze the lifecycle of fissile materials. We will design and develop integrated Navy nuclear propulsion systems, and address an array of technologies to enhance transportation security. Objective D: Support Responsible Civilian Nuclear Power Development and Fuel Cycle Management President Obama has called for the development of a new framework for international nuclear energy cooperation to reduce incentives for countries to pursue their own fuel-cycle facilities. The Department will help craft international nuclear technology rules and provide sound technology for implementation and enforcement. Objective E: Complete Environmental Remediation of

245

6 Management Plan Introduction  

E-Print Network (OSTI)

and enhance the fish and wildlife populations and the aquatic and terrestrial ecosystems that exist within for restoration of fish and wildlife habitat and populations which form the bulk of the management plan is derived or the inventory. The assessment and inventory are designed and may be used to guide restoration and management

246

California Long Term Energy Efficiency Strategic Plan (CPUC, 2008) The Long Term Energy Efficiency Strategic Plan (Plan) was developed through a collaborative process  

E-Print Network (OSTI)

California Long Term Energy Efficiency Strategic Plan (CPUC, 2008) The Long Term Energy Efficiency together over an elevenmonth period. This Plan sets forth a roadmap for energy efficiency in California costeffective deep levels of energy efficiency improvements including building shell upgrades, highefficiency

247

Planning Strategic Communications and Outreach for the Solar Program  

SciTech Connect

Advances made through the Solar Program in photovoltaic and solar thermal technologies must be well communicated to appropriate audiences if further technical and market growth will occur. As the Program's communications team, we developed a plan to: (1) integrate communications across the various solar technologies and reduce redundancy; (2) target audiences and messages strategically; (3) respond better to changes in markets, technology perceptions, audiences, and funding; (4) develop communication projects within the context of other relevant plans (e.g., Solar Program Multi-Year Technical Plan); (5) leverage limited resources; and (6) cultivate a multiyear mentality. Our approach included profiling eight key audiences, including their perceptions of solar technologies; formulating audience-specific messages and communication objectives and strategies; and proposing communications tactics to reinforce the objectives. Presently, we are conducting a needs assessment of print products, as well as a gap analysis. We will then prioritize projects, complete high-priority projects, measure effectiveness of selected projects and the plan, and seek strategic connections with other activities and programs.

Pedigo, S.; Nahan, R.; Moon, S.; Gwinner, D.; Brooks, C.; Butler Burt, W.

2005-01-01T23:59:59.000Z

248

Tactical Action Plan: Powering the Energy Frontier (An Appendix to the Strategic Roadmap 2024)  

SciTech Connect

The Tactical Action Plan identifies and describes the Western-wide tasks and activities, existing and new, needed to fully achieve the goals in Strategic Roadmap 2024. Each activity in the TAP chart is briefly described in this document and also linked to the Critical Pathway it supports. As the TAP is a list of specific strategies and actions susceptible to changing environments and needs, the TAP will be updated more frequently as Western progresses towards its goals. The TAP is organized into seven Strategic Target Areas that serve as Western抯 priorities and areas of focus for the next two to three years. These Target Areas are: Power and Transmission Related Services; Energy Infrastructure; Partnership and Innovation; Asset Management; Safety and Security; Communication; and Human Capital Management and Organization Structure. Target Areas are also used to create the agency抯 annual performance targets, which measure progress and implementation of the TAP, and the status of which will be reported regularly.

none,

2014-01-01T23:59:59.000Z

249

Overview of 2006 Department of Energy Strategic Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overview of 2006 Department of Energy Strategic Plan Overview of 2006 Department of Energy Strategic Plan Overview of 2006 Department of Energy Strategic Plan The Department of Energy (DOE) has a rich and diverse history with its lineage tracing back to the Manhattan Project and the race to develop an atomic bomb during World War II. Following that war, Congress created the Atomic Energy Commission (1946) to take control over the scientific and industrial complex supporting the Manhattan Project and to maintain civilian government control over atomic research and development. Overview of 2006 Department of Energy Strategic Plan More Documents & Publications U.S Department of Energy Strategic Plan The History of Nuclear Energy 2006 Department of Energy Strategic Plan - Scientific Discovery and Innovation

250

Strategic Planning, Design and Development of the Shale Gas Supply Chain Network  

E-Print Network (OSTI)

1 Strategic Planning, Design and Development of the Shale Gas Supply Chain Network Diego C. Cafaro1-term planning of the shale gas supply chain is a relevant problem that has not been addressed before Shale gas, supply chain, strategic planning, MINLP, solution algorithm * Corresponding author. Tel.: +1

Grossmann, Ignacio E.

251

Microsoft Word - FE STRATEGIC HUMAN CAPITAL MGMT PLAN082006-AB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Human Capital Management Plan September 2006 OFFICE OF FOSSIL ENERGY GOAL The Office of Fossil Energy (FE) will insure the adequate, efficient, and environmentally sound production, storage, and use of fossil fuels to meet our Nation's energy needs. FE HUMAN RESOURCES VISION FE's human capital vision is to be an employer of choice with a diverse, well-trained, and motivated workforce that will excel. The FE Human Capital Management Plan (HCMP) describes our mission and objectives, vision, human capital strategies and implementing framework, as well as a number of ongoing and new initiatives. We are implementing an integrated human capital system that plans and executes FE-wide human capital activities. INTRODUCTION FE views its human capital resources as its most important asset. Without a highly qualified and

252

DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL STRATEGIC PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENERGY OFFICE OF INSPECTOR GENERAL STRATEGIC PLAN FISCAL YEARS 2014 - 2019 "Strengthening the integrity, economy, and efficiency of the Department's programs and operations." INTRODUCTION The Inspector General Act of 1978, as amended, established an independent statutory Inspector General at the Department of Energy (Department) that is responsible for: 飩 Conducting independent and objective audits, investigations, and other reviews; 飩 Promoting economy, efficiency, and effectiveness in the administration of Department programs; 飩 Preventing and detecting fraud, waste, abuse, and mismanagement related to Department programs and operations; and 飩 Informing the Secretary and Congress about problems and deficiencies in

253

Transcript of April 3, 2013, TAP webinar titled State Energy Strategic Planning  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) transcript of a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

254

DOE OIG Strategic Plan Fiscal Years 2003-2008  

Energy.gov (U.S. Department of Energy (DOE))

This plan represents the Office of the Inspector General's vision and strong commitment for improving the management and performance of the Department of Energy抯 many programs and operations.

255

2013 Annual Planning Summary for the Strategic Petroleum Reserve  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Strategic Petroleum Reserve. The Strategic Petroleum Reserve's APS was...

256

Department of Energy Strategic Plan Mission Card, May 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mission: To ensure America's security and prosperity Mission: To ensure America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. Goal 1: Transform our Energy Systems Catalyze the timely, material, and efficient transformation of the nation's energy system and secure U.S. leadership in clean energy technologies. Goal 2: The Science and Engineering Enterprise Maintain a vibrant U.S. effort in science and engineering as a cornerstone of our economic prosperity, with clear leadership in strategic areas. Goal 3: Secure our Nation Enhance nuclear security through defense, nonproliferation, and environmental efforts. Goal 4: Management and Operational Excellence

257

Project Management Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to...

258

Plutonium Vulnerability Management Plan  

SciTech Connect

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

259

DOE Office of Indian Energy Foundational Course on Strategic Energy Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STRATEGIC ENERGY PLANNING Presented by the National Renewable Energy Laboratory Course Outline What we will cover... 飩 About the DOE Office of Indian Energy Education Initiative 飩 Course Introduction - What is Strategic Energy Planning - Developing a Strategic Energy Plan 飩 Key Aspects of Successful Planning 飩 Additional Information & Resources 2 Introduction The U.S. Department of Energy (DOE) Office of Indian Energy Policy & Programs is responsible for assisting Tribes with energy planning and development, infrastructure, energy costs, and electrification of Indian lands and homes. As part of this commitment, and on behalf of DOE, the Office of Indian Energy is leading education and capacity building efforts in

260

SSPPS STRATEGIC PLAN Pharmacy Education, Pharmaceutical Sciences Research, Clinical Pharmacy Practice  

E-Print Network (OSTI)

and medical centers, community pharmacy settings, academia, government and the pharmaceutical industry 3SSPPS STRATEGIC PLAN Pharmacy Education, Pharmaceutical Sciences Research, Clinical Pharmacy of Pharmacy and Pharmaceutical Sciences (SSPPS). The plan emanates from the work of three committees and has

Gleeson, Joseph G.

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Save the Date! Pennsylvania Strategic Energy Management Showcase 2015  

Energy.gov (U.S. Department of Energy (DOE))

Attend the Pennsylvania Strategic Energy Management Showcase on April 7, 2015, at the Penn Stater Conference Center Hotel in State College, Pennsylvania, and learn about the Better Plants Program and Superior Energy Performance (SEP). The Showcase includes presentations on how Better Plants and SEP work and the valuable tools and resources they offer to industrial manufacturers and facilities.

262

BNL Strategic Plan for Nuclear Physics T. Kirk, Associate Laboratory Director, HENP  

E-Print Network (OSTI)

BNL Strategic Plan for Nuclear Physics T. Kirk, Associate Laboratory Director, HENP January 3, 2005 Abstract: The strategic plan for Nuclear Physics at Brookhaven National Laboratory seeks to align itself of the Laboratory to the advance of nuclear physics. To accomplish these guiding principles, we seek to identify

263

Texas A&M University at Galveston 2011 2015 Strategic Plan  

E-Print Network (OSTI)

Texas A&M University at Galveston 2011 颅 2015 Strategic Plan http://www.tamug.edu/StrategicPlan TAMUG Mission Statement Texas A&M University at Galveston is a special-purpose institution of higher and Core Values Texas A&M University at Galveston (TAMUG) is committed to being the premier university

Mukhtar, Saqib

264

School of Architecture Strategic Plan Outline page 1 School of Architecture  

E-Print Network (OSTI)

School of Architecture Strategic Plan Outline 颅 page 1 School of Architecture Montana State University Strategic Planning Document Condensed Outline May 24, 2013 School of Architecture Vision Recognizing that architecture is a basic human need, we strive to play an essential and innovative role

Maxwell, Bruce D.

265

Overview of 2006 Department of Energy Strategic Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overview of 2006 Department of Energy Strategic Plan Overview of 2006 Department of Energy Strategic Plan Overview of 2006 Department of Energy Strategic Plan The Department of Energy (DOE) has a rich and diverse history with its lineage tracing back to the Manhattan Project and the race to develop an atomic bomb during World War II. Following that war, Congress created the Atomic Energy Commission (1946) to take control over the scientific and industrial complex supporting the Manhattan Project and to maintain civilian government control over atomic research and development. Overview of 2006 Department of Energy Strategic Plan More Documents & Publications U.S Department of Energy Strategic Plan Booklet, DOE Subject Area Indicators and Key Word List for RD and FRD - October 2005 FY 2008 Budget Justification

266

Department of Energy - Idaho Operations Office FY-2013 and Beyond Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

- Idaho Operations Office - Idaho Operations Office FY-2013 and Beyond Strategic Plan Introduction The Department of Energy Idaho Operations Office (DOE-ID) 2013 Strategic Plan and Beyond outlines the Federal workforce mission, vision, strategies, objectives, responsibilities, and expectations that will sustain the successful accomplishment of the Idaho National Laboratory (INL) Site mission. DOE-ID's Strategic Plan is aligned with the DOE Headquarters Strategic Plan and DOE-ID's efforts toward becoming an internationally recognized world class laboratory. By implementing this Strategic Plan, DOE-ID is playing an important supporting role in achieving DOE's overall mission to ensure America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and

267

Texas Facilities Commission's Facility Management Strategic Plan  

E-Print Network (OSTI)

Pneumatic compressor and air distribution piping. #0;y Controls tend to drift out of calibration. #0;y Susceptible to leaks. #0;y Compressor is a single point of failure. #0;y Reconfiguration requires hardware and piping. #0;y Can not be remotely... monitored. #0;y Manual intervention required to make adjustments. #0;y No pneumatic compressor or air distribution piping. #0;y Can be remotely monitored, adjusted or (re)configured. #0;y Software calibration. #0;y Controls are distributed, so no single...

Ramirez, J. A.

268

University of Glasgow Carbon Management Programme Carbon Management Plan working with  

E-Print Network (OSTI)

carbon vision 11 2.3 Strategic themes 12 Targets and objectives 13 3 Emissions Baseline and Projections. Professor Anton Muscatelli, Principal Foreword from the Carbon Trust Cutting carbon emissions as partUniversity of Glasgow Carbon Management Programme Carbon Management Plan working with Page 1 Carbon

Mottram, Nigel

269

Strategic Programs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Strategic Programs Strategic Programs The Strategic Programs Division establishes, develops, and maintains Department-wide policies, regulations, standards, and procedures pertaining to acquisition and to include: leveraging the Department's large buying requirements to purchase more cost effectively and efficiently through the Energy-Wide Strategic Sourcing (EWSS) Program by implementing strategic sourcing processes on a Department-wide basis, driven by strategic planning, an in-depth understanding of internal purchasing needs, and insight and knowledge of supply markets; manages the Department's Government Purchase Card (PCard) Program, including development and implementation of policy and oversight of PCard usage, liaison with issuing banks, liaison with Field Offices and major DOE

270

Strategic Program Planning Lessons Learned in Developing the LTS S&T Roadmap  

SciTech Connect

Technology roadmapping is a strategic planning method used by companies to identify and plan the development of technologies necessary for new products. The U.S. Department of Energy抯 Office of Environmental Management has used this same method to refine requirements and identify knowledge and tools needed for completion of defined missions. This paper describes the process of applying roadmapping to clarify mission requirements and identify enhancing technologies for the Long-Term Stewardship (LTS) of polluted sites after site cleanup has been completed. The nature of some contamination problems is such that full cleanup is not achievable with current technologies and some residual hazards remain. LTS maintains engineered contaminant barriers and land use restriction controls, and monitors residual contaminants until they no longer pose a risk to the public or the environment. Roadmapping was used to clarify the breadth of the LTS mission, to identify capability enhancements needed to improve mission effectiveness and efficiency, and to chart out the research and development efforts to provide those enhancements. This paper is a case study of the application of roadmapping for program planning and technical risk management. Differences between the planned and actual application of the roadmapping process are presented along with lessons learned. Both the process used and lessons learned should be of interest for anyone contemplating a similar technology based planning effort.

Duane Hanson; Brent Dixon; Gretchen Matthern

2003-07-01T23:59:59.000Z

271

Strategic Program Planning Lessons Learned In Developing The Long-Term Stewardship Science and Technology Roadmap  

SciTech Connect

Technology roadmapping is a strategic planning method used by companies to identify and plan the development of technologies necessary for new products. The U.S. Department of Energy's Office of Environmental Management has used this same method to refine requirements and identify knowledge and tools needed for completion of defined missions. This paper describes the process of applying roadmapping to clarify mission requirements and identify enhancing technologies for the Long-Term Stewardship (LTS) of polluted sites after site cleanup has been completed. The nature of some contamination problems is such that full cleanup is not achievable with current technologies and some residual hazards remain. LTS maintains engineered contaminant barriers and land use restriction controls, and monitors residual contaminants until they no longer pose a risk to the public or the environment. Roadmapping was used to clarify the breadth of the LTS mission, to identify capability enhancements needed to improve mission effectiveness and efficiency, and to chart out the research and development efforts to provide those enhancements. This paper is a case study of the application of roadmapping for program planning and technical risk management. Differences between the planned and actual application of the roadmapping process are presented along with lessons learned. Both the process used and lessons learned should be of interest for anyone contemplating a similar technology based planning effort.

Dixon, B.W.; Hanson, D.J.; Matthern, G.E.

2003-04-24T23:59:59.000Z

272

2013 Strategic Planning Initiative Market/Demand Resources Index of Resources  

E-Print Network (OSTI)

Workforce Profile 16. WWAMI Physician Workforce 2005 17. UA Expanding Access to Health Programs (EAHP) Plan 18. State Health Care Workforce Development Planning Grant Planning Alaska's Health Workforce FINAL;2013 Strategic Planning Initiative Market/Demand Resources Title: 2009 Alaska Health Workforce Vacancy Study

Pantaleone, Jim

273

Integration of reclamation and tailings management in oil sands surface mine planning  

Science Journals Connector (OSTI)

The processing of oil sands generates large volumes of slurry, known as tailings, that is impounded in tailings ponds. Oil sands operators are committed to develop reclamation plans to ensure that the mine site is restored to a natural or economically ... Keywords: Integer programming, Mine planning, Oil sands, Open-pit mining, Reclamation planning, Strategic planning, Tailings management

Mohammad Mahdi Badiozamani; Hooman Askari-Nasab

2014-01-01T23:59:59.000Z

274

Office of Inspector General Strategic Plan Fiscal Years 2009 through 2013  

SciTech Connect

The Department of Energy (Department) Organization Act created the Department in October 1977. That law brought together for the first time, not only most of the government's energy programs, but also science and technology programs and defense responsibilities that included the design, construction, and testing of nuclear weapons. Over its history, the Department has shifted its emphasis and focus as the energy and security needs of the Nation have changed. Today, the Department stands at the forefront of helping the Nation meet our energy, scientific, environmental, and national security goals. The responsibility of the Office of Inspector General (OIG) is to ensure that the Department is: Fulfilling its program and operational goals effectively; Using its resources efficiently in this pursuit; Operating within the scope of its legislative mandates; Meeting the President's Management Agenda; and, Addressing Departmental priorities established by the Secretary. The OIG accomplishes this by performing audits, investigations, and inspections of the Department's programs and operations seeking to uncover existing or potential weaknesses that could result in fraud, waste, and abuse. This strategic plan reflects the vision for how the organization will move forward in the 21st century to ensure the Department continues to serve the American public safely, effectively, and efficiently. Through its strategic planning efforts, the OIG will continue to play a critical role in assisting the Department's leadership and the Congress by identifying opportunities for improving management, program performance, and accountability. The OIG's strategic goal is to perform a robust review program that provides timely, relevant performance information and recommendations to improve the performance of the Department's programs and operations, facilitate positive change, and combat unlawful activities within the Department.

None

2008-10-01T23:59:59.000Z

275

SES Performance Management System Plan Training | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System Plan Training SES Performance Management System Plan Training Overview of the DOE SES Performance Management System. Senior Executive Service Performance...

276

Article on the Grid Tech Team's Strategic Plan for Grid Modernization Now  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Article on the Grid Tech Team's Strategic Plan for Grid Article on the Grid Tech Team's Strategic Plan for Grid Modernization Now Available Article on the Grid Tech Team's Strategic Plan for Grid Modernization Now Available January 11, 2013 - 4:10pm Addthis A new article by OE's Kerry Cheung, William Parks and Anjan Bose in IEEE's Smart Grid newsletter describes the Department of Energy's strategic plan to achieve a future electricity system that will be cost-effective, seamless from generation to end-use, and capable of meeting all clean energy demands and capacity requirements. Developed by DOE's Grid Tech Team (GTT), the proposed strategy recognizes the diversity and uncertainty of future energy demands and generation portfolios, the inherent regional differences in needs, goals and resources, and the critical importance of continued dialogue and engagement with appropriate

277

DOE Office of Indian Energy Foundational Course on Strategic Energy Planning Audio Version  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Course: Course: Strategic Energy Planning (text version) Below is the text version of the Webinar titled "DOE Office of Indian Energy Foundational Course: Strategic Energy Planning." Amy Hollander: Hello. I'm Amy Hollander with the National Renewable Energy Laboratory. Welcome to today's webinar on strategic energy planning sponsored by the U.S. Department of Energy Office of Indian Energy Policy and Programs. This webinar is being recorded from DOE's National Renewable Energy Laboratory's brand new state-of-the-art net- zero energy research support facility in Golden, Colorado. Our strategic energy planning presentation today is one of nine foundational webinars in the series from the DOE Office of Indian Energy Education Initiative, which is designed to assist tribes with energy

278

Strategic Planning -College -Agricultural Sciences & Natural Resources Unit Assessment Report -Four Column  

E-Print Network (OSTI)

Strategic Planning - College - Agricultural Sciences & Natural Resources Unit Assessment Report - Four Column Texas Tech University Priorities Means of Assessment & Criteria / Tasks Results Action & Natural Resources - 2013 Priority 1_Increase Enrollment and Promote Student Success (CASNR - Outcome 1

Zhang, Yuanlin

279

Role of the NHA in Strategic Planning for the Hydrogen Economy  

Science Journals Connector (OSTI)

The NHA, in conjunction with the U.S. Department of Energy, is defining the path to a hydrogen energy industry. The NHA has produced a...Strategic Planning for the Hydrogen Economy: The Hydrogen Commercialization...

Robert L. Mauro; Karen I. Miller

1998-01-01T23:59:59.000Z

280

Natural Resource Management Plan Update  

E-Print Network (OSTI)

Natural Resource Management Plan Update Tim Green Environmental Protection Division Community. Cultural Resources) 路 Focus on gaining better understanding of site resources 路 Began or continued managing 路 Monitoring layers 路 Cultural Resources 颅 WW I, WW II, CCC GIS used for planning 颅 NSLS II, LISF, Permits, etc

Homes, Christopher C.

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Community Greening: How To Develop A Strategic Energy Plan, Energy Efficiency & Renewable Energy (EERE) (Brochure)  

NLE Websites -- All DOE Office Websites (Extended Search)

COMMUNITY GREENING: COMMUNITY GREENING: HOW TO DEVELOP A STRATEGIC ENERGY PLAN When should strategic energy planning begin? Planning usually begins as a reaction to increasing prices, the potential for large investments in infrastructure development, or a political change. Therefore, it can begin at any time. Sometimes, planning is a reaction to a natural disaster that allows for extensive redevelopment. This topic is specifically covered in an associated publication, "From Tragedy to Triumph-Rebuilding Green Homes after Disaster." Ideally, the community would have a plan in place before disaster strikes, but that is rarely the case. Because a strategic energy plan can help inform decisions on infrastructure repair and replacement, and lead to the development

282

Complexity cost quantification and modeling for strategic portfolio management  

E-Print Network (OSTI)

This project explores portfolio management and planning through effectively reducing complexity within operations. We apply this to a major healthcare company (referred to as Company X). The anticipated launch of new ...

Ma, Jan, S.M. Massachusetts Institute of Technology

2014-01-01T23:59:59.000Z

283

Strategic Plan for Patient Care and Prevention Facilities Design & Construction; Engineering Strategic Business Unit  

E-Print Network (OSTI)

The UTMDACC (University of Texas MD Anderson Cancer Center) will realize net savings of $1.6 million in five years by utilizing the PCPF-E SBU (Patient Care and Prevention Facilities Design & Construction; Engineering Strategic Business Unit...

Wangia, Peter Odongo

2009-07-31T23:59:59.000Z

284

E-Print Network 3.0 - assistance program plan Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Community Strategic Plans, Delivery Programs... complementary long term financial, workforce and asset management plans Develop ... Source: University of Technology, Sydney...

285

STRATEGIC PLAN FOR COORDINATING RURAL INTELLIGENT TRANSPORTATION SYSTEM (ITS) TRANSIT DEVELOPMENT IN THE GREAT SMOKY MOUNTAINS NATIONAL PARK  

NLE Websites -- All DOE Office Websites (Extended Search)

256 256 STRATEGIC PLAN FOR COORDINATING RURAL INTELLIGENT TRANSPORTATION SYSTEM (ITS) TRANSIT DEVELOPMENT IN THE GREAT SMOKY MOUNTAINS NATIONAL PARK L. F. Truett (TRUETTLF@ORNL.GOV) S. M. Chin (CHINS@ORNL.GOV) E. C. P. Chang (ECC2005@ORNL.GOV) November 2002 Prepared for the FEDERAL TRANSIT ADMINISTRATION U.S. DEPARTMENT OF TRANSPORTATION Washington, D.C. 20590 Prepared by the Center for Transportation Analysis OAK RIDGE NATIONAL LABORATORY Oak Ridge, Tennessee 37831-6073 managed by UT-BATTELLE, LLC for the U.S. DEPARTMENT OF ENERGY under Contract No. DE-AC05-00OR22725 Coordination of Transit Concepts in GSMNP page iii, 11/12/02 STRATEGIC PLAN FOR COORDINATING RURAL INTELLIGENT TRANSPORTATION SYSTEM (ITS) TRANSIT DEVELOPMENT IN THE

286

Evidence-Based Background Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3/107 3/107 Evidence-Based Background Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans Implementing Sustainability: The Institutional-Behavioral Dimension Elizabeth L. Malone Tom Sanquist Amy K. Wolfe Rick Diamond Christopher Payne Jerry Dion January 2011 (Updated June 2013) Federal Energy Management Program U.S. Department of Energy DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available free via the U.S. Department of Energy (DOE) Information Bridge. Web site http://www.osti.gov/bridge Reports produced before January 1, 1996, may be purchased by members of the public from the following source. National Technical Information Service 5285 Port Royal Road

287

Evidence-Based Background Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

3/107 3/107 Evidence-Based Background Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans Implementing Sustainability: The Institutional-Behavioral Dimension Elizabeth L. Malone Tom Sanquist Amy K. Wolfe Rick Diamond Christopher Payne Jerry Dion January 2011 (Updated June 2013) Federal Energy Management Program U.S. Department of Energy DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available free via the U.S. Department of Energy (DOE) Information Bridge. Web site http://www.osti.gov/bridge Reports produced before January 1, 1996, may be purchased by members of the public from the following source. National Technical Information Service 5285 Port Royal Road

288

PRC Contract Management Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Contract Management Team Members, Including Roles and Responsibilities ... 3 Contracting Officer ......

289

LPP Risk Management Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

History and Process History and Process Slide 2 M E Environmental Management Environmental Management History 鈼 Current Baseline Process Overview 鈼 Identification 鈼 Simulation 鈼 Management Successes & Challenges Slide 3 M E Environmental Management Environmental Management Current Baseline Risks 鈼 1 Week Risk Summit held week of August 4 th , 2008 Broad representation from all levels of Isotek, DOE, PTC, and outside consultants Focused on risk and opportunity identification Included risk description, assumptions, and triggers No quantification or analysis No restrictions, constraints, or filtering HQ provided facilitator Prescribed format and capture methodology Slide 4 M E Environmental Management Environmental Management Current Baseline Risks 鈼 Risk Summit Results

290

PROJECT MANAGEMENT PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

7, 2011 Verification Method: Functional model module operating in decision support system Title: Water institutions tool: Phase I Planned Date: April 1, 2011 Verification...

291

Microsoft Word - Strategic Plan update CJ 02.10.12 F  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Plan Update Strategic Plan Update In May 2011, the Department of Energy (DOE) released its new Strategic Plan, a document that outlines the broad, cross-cutting and collaborative goals that stretch across our complex. It is intended to serve as a blueprint for the Department of Energy to help address the nation's energy, environmental, and nuclear challenges through transformative science and technology solutions. The plan articulates how the Department's missions and programs are designed to bring the best minds and capabilities to bear on important problems. DOE draws on the diverse talents of our federal workforce, scientists and engineers from national laboratories, academia, and the private sector in multidisciplinary teams, striving to find solutions to the most complex and

292

Multiscale Strategic Planning Model for the Design of Integrated Ethanol and Gasoline Supply Chain  

E-Print Network (OSTI)

1 Multiscale Strategic Planning Model for the Design of Integrated Ethanol and Gasoline Supply address the design and planning of an integrated ethanol and gasoline supply chain. We assume, distribution centers where blending takes place, and the retail gas stations where different blends of gasoline

Grossmann, Ignacio E.

293

Environmental Management System Plan  

E-Print Network (OSTI)

management Water conservation LBNL抯 approach to sustainable environmentalWater Discharges) of Introduction Environmental Managementenvironmental compliance programs, such as air and water quality, as well as less traditional programs, such as wildland fire management,

Fox, Robert

2009-01-01T23:59:59.000Z

294

INL-Site Idaho Completion Project Long Term Stewardship Strategic Plan  

SciTech Connect

This Strategic Plan provides a brief historical overview of ICP long-term stewardship at the INL Site and the major goals and strategies that will drive the continued implementation of long-term stewardship in the future. The specific activities and processes that will be required to implement these goals should be outlined within an implementation plan and within implementing procedures and work plans.

Olaveson, B.

2007-09-17T23:59:59.000Z

295

Tribal Strategic Energy Planning Provides a Step in the Right Direction |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Energy Planning Provides a Step in the Right Strategic Energy Planning Provides a Step in the Right Direction Tribal Strategic Energy Planning Provides a Step in the Right Direction June 14, 2013 - 12:13pm Addthis Engaging stakeholders and identifying priorities is critical to developing a strong energy vision. Here, the START workshop held at the Passamaquoddy Tribes of Indian Township and Pleasant Point in Maine helped open the lines of communication between two reservations that exist under a single Tribe. Photo from Paul Dearhouse of Dearhouse Consulting Group, NREL 24503 Engaging stakeholders and identifying priorities is critical to developing a strong energy vision. Here, the START workshop held at the Passamaquoddy Tribes of Indian Township and Pleasant Point in Maine helped open the lines

296

Tribal Strategic Energy Planning Provides a Step in the Right Direction |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Energy Planning Provides a Step in the Right Strategic Energy Planning Provides a Step in the Right Direction Tribal Strategic Energy Planning Provides a Step in the Right Direction June 14, 2013 - 12:13pm Addthis Engaging stakeholders and identifying priorities is critical to developing a strong energy vision. Here, the START workshop held at the Passamaquoddy Tribes of Indian Township and Pleasant Point in Maine helped open the lines of communication between two reservations that exist under a single Tribe. Photo from Paul Dearhouse of Dearhouse Consulting Group, NREL 24503 Engaging stakeholders and identifying priorities is critical to developing a strong energy vision. Here, the START workshop held at the Passamaquoddy Tribes of Indian Township and Pleasant Point in Maine helped open the lines

297

Strategic Plan Progress Report Prepared by Energy Division,  

E-Print Network (OSTI)

Integrated Demand-Side Management (IDSM)............................................25 9 Workforce, Education

298

Environmental Management System Plan  

E-Print Network (OSTI)

Water Discharges) of Introduction Environmental Managementmanagement Water conservation LBNL抯 approach to sustainable environmentalEnvironmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: Protect the air, water,

Fox, Robert

2009-01-01T23:59:59.000Z

299

0 U.S. Department of Energy Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 U.S. Department of Energy Strategic Plan 0 U.S. Department of Energy Strategic Plan The scope of the Department's environmental cleanup includes stabilization and disposition of some of the earth's most hazardous materials generated from spent nuclear fuel and nuclear radioactive waste material. The cleanup program resulting from over five decades of nuclear weapons production and energy research is the largest active cleanup program in the world. In addition, after active cleanup, residual risks will remain for significant periods of time at most DOE cleanup sites. The Department will take appropriate action to protect human health and the environment from these residual risks. The Department continues its effort to

300

Guide to Community Energy Strategic Planning: Step 2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-1 March 2013 WHAT: Engaging members of the community in the energy planning process will help your plan to succeed, because creating a viable, transformative energy future rests...

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Karuk Tribe Strategic Energy Plan and Energy Options Analysis  

SciTech Connect

Energy planning document to assist the Karuk Tribe in making educated decisions about future energy priorities and implementation.

Ramona Taylor, Karuk Tribe; David Carter, Winzler and Kelly

2009-03-31T23:59:59.000Z

302

U.S. Department of Energy Strategic Sustainability Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quality The Office of Management and Budget June 2, 2010 U.S. Department of ENERGY Strategic Sustainability Performance Plan Discovering Sustainable Solutions to Power...

303

Best Management Practice: Water Management Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Best Management Practice: Water Management Planning Best Management Practice: Water Management Planning Best Management Practice: Water Management Planning October 7, 2013 - 3:03pm Addthis A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans. Water management plans should provide clear information about how a facility uses water from the time it is piped in to its ultimate disposal. Knowing how water is used and what it costs enables Federal agencies to make appropriate water management decisions. Overview Federal facility water management plans should include the following: Water Use Policy Statement and Goals Senior management should indicate support for water efficiency in a material way. This can be done in two ways:

304

U.S. Department of Energy Clean Cities Five-Year Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy Clean Cities Five-Year Strategic Plan Reducing Petroleum Dependence in On-Road Transportation in the United States January 2011 Prepared by Cambridge Concord Associates Clean Cities Five-Year Strategic Plan, January 2011 1 Contents List of Abbreviations 3 Driving the Clean Cities Mission Forward 4 The Centrality of the Coalitions to the Success of the Clean Cities Mission 5 Executive Summary 5 Overarching Vision Maximize the Impact of Clean Cities 7 Strategic Direction Significantly Expand Clean Cities' Petroleum Reduction Efforts in the 8 Portfolio of Technologies Alternative Fuels - Electric Drive, Natural Gas, Propane Electric Drive 9 Natural Gas 13 Propane 17 Renewable Fuels - Renewable Natural Gas/Biomethane, Ethanol, Biodiesel

305

Mercury Strategic Plan Outfall 200 Mercury Treatment Facility  

Office of Environmental Management (EM)

Partial LMR * Alpha-5 LMR & Bldg Characterization * S&M mercury removal * Hg waterfishsediment studies * Technology Development Plan * Debris treatability study * Fate and...

306

DOE OIG Strategic Plan Fiscal Years 2014- 2019  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Inspector General抯 plan to strengthen the integrity, economy, and efficiency of the Department抯 programs and operations.

307

Guide to Community Energy Strategic Planning: Step 10  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Examples of effective outreach: Omaha (NE) Energy Plan www.omahaenergyplan.orgindex.phpmeasuring-success-menu Green Energy Match program - San Jose, CA...

308

Guide to Community Energy Strategic Planning: Step 4  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Omaha (NE) Energy Profile (part of Omaha's Energy Plan) www.omahaenergyplan.orgindex.phpenergy-profile Berea (KY) Energy Inventory Report: Base Year 2010 (part of Berea's...

309

Growing Green As part of its strategic plan to foster growth and development in key  

E-Print Network (OSTI)

to sustainable business development and corporate ethics, and helps companies embrace fiscal as well as greenGrowing Green As part of its strategic plan to foster growth and development in key areas related to energy and the environment, Western University has created the Centre for Environmental Sustainability

Denham, Graham

310

Dynamic Chess: Strategic Planning for Robot Motion Tobias Kunz, Peter Kingston, Mike Stilman and Magnus Egerstedt  

E-Print Network (OSTI)

robot sword defense. Our approach enables a simulated 7-DOF robot arm to block known attacks in any, we concentrate on the following task: A robot arm, equipped with a sword must defend from a seriesDynamic Chess: Strategic Planning for Robot Motion Tobias Kunz, Peter Kingston, Mike Stilman

Egerstedt, Magnus

311

U.S. Nuclear Waste Technical Review Board Fiscal Year 2002-2007 Strategic Plan  

E-Print Network (OSTI)

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Fiscal Year 2002-2007 Strategic Plan Statement of the Chairman The U.S. Nuclear Waste Technical Review Board was established of Energy Mission The Board's mission, established in the Nuclear Waste Policy Amendments Act (NWPAA

312

U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20042009  

E-Print Network (OSTI)

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2004颅2009 (Revised March 2004) Statement of the Board The Nuclear Waste Policy Amendments Act of 1987 directed the U-level radioactive waste. The Act also established the U.S. Nuclear Waste Technical Review Board as an indepen dent

313

Strategic Planning and Policy Unit Nuffield Council on Bioethics Consultation on Forensic use of bioinformation: ethical  

E-Print Network (OSTI)

Strategic Planning and Policy Unit Nuffield Council on Bioethics Consultation on Forensic use of forensic bioinformation. 2. The Wellcome Trust is the largest charity in the UK and the second largest. Given the Trust's interests, this brief response will focus on the science underlying the forensic use

Rambaut, Andrew

314

Request For Records Disposition Authority: Strategic Petroleum Reserve  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request For Records Disposition Authority: Strategic Petroleum Request For Records Disposition Authority: Strategic Petroleum Reserve Project Management Office Request For Records Disposition Authority: Strategic Petroleum Reserve Project Management Office Paper case files pertaining to environmental permit applications, permits and related correspondence as well as NEPA correspondence within of the Strategic Petroleum Reserve Project Management Office (SPRPMO) Request For Records Disposition Authority: Strategic Petroleum Reserve Project Management Office More Documents & Publications 2012 Annual Planning Summary for Fossil Energy, National Energy Technology Laboratory, RMOTC, and Strategic Petroleum Reserve Field Office CX-002673: Categorical Exclusion Determination CX-009794: Categorical Exclusion Determination

315

1.259J / 11.542J / ESD.227J Transit Management, Spring 2003  

E-Print Network (OSTI)

Management methods of relevance to public transportation systems. Topics: strategic planning management; labor relations; maintenance planning and administration; financing; marketing and fare policy; and management ...

Wilson, Nigel H. M.

316

Strategic Biotechnology  

Science Journals Connector (OSTI)

Strategic Biotechnology ... The federal strategic plan, from the White House Office of Science & Technology Policy (OSTP), targets research and innovation in biology and biotechnology as an avenue for economic growth. ...

ANDREA WIDENER

2012-05-07T23:59:59.000Z

317

U.S. Department of Energy Strategic Plan 3  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 The Department's strategic themes and goals will be accomplished not only through the efforts of the major program offices in the Department but with additional effort from staff offices that support the management of the programs in carrying out the mission. DOE is committed to integrated management and is taking steps to ensure that this is one of the critical initiatives that will assist the Department's leadership in achieving the strategic goals. DOE will endeavor to make sure it has the necessary skills available to carry out the mission and to continue bringing in talented and qualified

318

Strategic plan guides EPA's R&D efforts  

Science Journals Connector (OSTI)

By last November, a draft plan had been sent out for comment梑oth for formal peer review by EPA's Science Advisory Board and for informal critiques from scientific organizations like the American Chemical Society. ... Two committees of the National Research Council are also reviewing the plan. ...

LOIS EMBER

1996-02-12T23:59:59.000Z

319

Water Management Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

water efficiency water efficiency at Federal sites Background The Federal Energy Management Program (FEMP) sponsored a water assessment at the Y-12 National Security Complex (Y-12) located in Oak Ridge, Tennessee, during fiscal year 2010. Driven by mandated water reduction goals of Executive Orders 13423 and 13514, the objective of the water assessment was to develop a comprehensive understanding of the current water-consuming applications and equipment at Y-12 and to identify key areas for water efficiency improvements. The water-assessment team learned key lessons from the Y-12 assessment. Therefore, the aim of this document is to share these key lessons to help other large process-driven sites at the Department of Energy (DOE) and beyond develop a comprehensive

320

Water Management Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

water efficiency water efficiency at Federal sites Background The Federal Energy Management Program (FEMP) sponsored a water assessment at the Y-12 National Security Complex (Y-12) located in Oak Ridge, Tennessee, during fiscal year 2010. Driven by mandated water reduction goals of Executive Orders 13423 and 13514, the objective of the water assessment was to develop a comprehensive understanding of the current water-consuming applications and equipment at Y-12 and to identify key areas for water efficiency improvements. The water-assessment team learned key lessons from the Y-12 assessment. Therefore, the aim of this document is to share these key lessons to help other large process-driven sites at the Department of Energy (DOE) and beyond develop a comprehensive

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

DOCS System Configuration Management Plan | Department of Energy  

Energy Savers (EERE)

DOCS System Configuration Management Plan DOCS System Configuration Management Plan The DOCS Systems Configuration Management Plan (SCMP), from an actual DOE systems engineering...

322

Adaptive Management, Adaptive Planning, Review and Audit  

Science Journals Connector (OSTI)

Planning should be a continuous, iterative and developmental ... for any given place and time. Management reviews are an integral and essential component of ... is not strictly a component of the management planning

Mike Alexander

2013-01-01T23:59:59.000Z

323

ConservationandDemand ManagementPlan  

E-Print Network (OSTI)

; Introduction Ontario Regulation 397/11 under the Green Energy Act 2009 requires public agencies and implement energy Conservation and Demand Management (CDM) plans starting in 2014. Requirementsofthe ConservationandDemand ManagementPlan 2014-2019 #12

Abolmaesumi, Purang

324

Modern Strategic Mine Planning By Graham A. Davis  

E-Print Network (OSTI)

. It is also largely devoid of financial and economic fundamentals. For instance, traditional discounted cash to value correctly the suite of decisions that it does suggest. Although current mine planning decisions

325

Performance Demonstration Program Management Plan  

SciTech Connect

To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization抯 quality assurance (QA) program and procedures or as otherwise directed by CBFO.

Carlsbad Field Office

2005-07-01T23:59:59.000Z

326

Electric Utility Strategic Planning at the PUCT: An Overview  

E-Print Network (OSTI)

the sponsorship of the Electric Power Research Institute (EPRI). Both econometric and end-use models rely upon forecasts of economic and demographic factors. Since such projections are cOllllllonly not available at the appropriate geographical level... Regulatory Research Institute's (NRRI) Capacity Expansion and Reliability Evaluation System (CERES) was implemented for the HL&P system. There are also plans to experiment with EPRI's Electric Generation Expansion Planning (EGEAS) model in the future...

Zarnikau, J.

327

Planning for an Energy Management System  

Energy.gov (U.S. Department of Energy (DOE))

This presentation discusses the Planning step as part of an Energy Management System. Planning involves establishing your energy picture, defining the scope and boundary, setting an energy baseline, and developing action plans.

328

Institutional Design for Strategic Environmental Assessment on Urban Economic and Social Development Planning in China  

SciTech Connect

The National Economic and Social Development Plans (NESDPs) of cities in China, given their comprehensive, integrated and strategic nature, have significant and profound impacts on the development of cities and their embedded ecological environments. Strategic Environmental Assessments (SEAs) on city NESDPs have the potential to improve environmental policy integration at strategic level and to safeguard the sustainable development of cities. However, these plans are normally exempted from the current SEA requirement in China. We argue that it is more feasible to apply SEAs on city NESDPs before SEAs are expanded to higher level NESDPs in China. This article attempts to propose a China-specific institutional design for SEAs on city NESDPs based on experiments in selected cities and within the current legal framework. To obtain a holistic view about the long-term development of cities, more qualitative and descriptive analysis-based assessment methods should be adopted to broaden participation, to encourage the exchange of information and to reach consensus. - Highlights: > National Economic and Social Development Plans for Cities (NESDPs) in China is a very popular and significant decision made by municipal government. > We propose a institutional framework to conduct strategic environmental assessment to NESDPs. > The key features of the institutional framework are the independent SEA approval committee and a professional consulting agency.

Song Guojun, E-mail: Songguojun@vip.sohu.com; Zhou Li; Zhang Lei

2011-11-15T23:59:59.000Z

329

Optimization Online - Operations Risk Management by Planning ...  

E-Print Network (OSTI)

Aug 1, 2007 ... Operations Risk Management by Planning Optimally the Qualified Workforce Capacity. Emmanuel Fragni re(Emmanuel.Fragniere ***at***...

Emmanuel Fragni re

2007-08-01T23:59:59.000Z

330

EM International Strategic Plan 2010-2015 | Department of Energy  

Office of Environmental Management (EM)

Office of Environmental Management (EM) in identifying technologies and strategies for waste processing, groundwater and soil remediation, spent nuclear fuel and surplus nuclear...

331

Transcript of See Action and Technical Assistance Program Webinar: Strategic Energy Management  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) See Action Network and Weatherization and Intergovernmental Program Technical Assistance Program sponsored this webinar about strategic management in the public sector on November 7, 2012.

332

EEO Management Plan 20072010 September 2007 1  

E-Print Network (OSTI)

EEO Management Plan 2007颅2010 September 2007 1 EEO Management Plan 2007-2010 Part 9A of the Anti-Discrimination Act (1977) and the Equal Opportunity for Women in the Workplace Act 1999, the EEO Management Plan awarded annually by EOWA) CDPS Cultural Diversity Priorities Statement HRS Human Resource Services ODU

Dunstan, Neil

333

Solid Waste Management Plan. Revision 4  

SciTech Connect

The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

NONE

1995-04-26T23:59:59.000Z

334

VA Energy Management Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VA Energy Management VA Energy Management Action Plan Ken Demers Chief, VA National Energy Business Center Purpose Cited Deficiencies Within VA's Previous Energy Program... *No comprehensive Department-wide policy *Lack of coordinated acquisition and investment strategies throughout the Administrations and Staff Offices *No uniform measurement and verification of energy usage *Unverifiable reporting mechanism *Lack of capturing "lessons learned" and best practices from previous experiences Potential Annual Savings ENERGY COST ($000) CONSUMPTION (Billion Btu) Baseline - FY 2005: $397,577 Baseline - FY 2005: 29,094 Savings Savings SOURCE OF SAVINGS FY 2007 FY 2008 Future TOTAL

335

Waste Management Quality Assurance Plan  

SciTech Connect

The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs.

Waste Management Group

2006-08-14T23:59:59.000Z

336

Cornell University at its Sesquicentennial A Strategic Plan  

E-Print Network (OSTI)

, excellence, and assessment are three elements this plan. Our highest priority proposed for the next five years is to sustain and enhance faculty excellence, with special emphasis given to promoting"address on October 23, 2009. He argued that Cornell University is supported by four fundamental pillars: Classical

Chen, Tsuhan

337

OFFICE OF FACILITIES ENGINEERING AND OPERATIONS Strategic and  

E-Print Network (OSTI)

Engineering Museum Support Services Bruce Kendall Director Sheryl Kolasinski DD/CoS Facilities Master Planning Management Engineering &Design Management Technical Services Fire Protection Occupational Safety OccupationalOFFICE OF FACILITIES ENGINEERING AND OPERATIONS Strategic and Administrative Management Julie

Mathis, Wayne N.

338

ICDF Complex Operations Waste Management Plan  

SciTech Connect

This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

W.M. Heileson

2006-12-01T23:59:59.000Z

339

Author's personal copy Knowledge management technology as a stage for strategic  

E-Print Network (OSTI)

of knowledge management technologies like intranets, recommender systems, and social networking sites for capAuthor's personal copy Knowledge management technology as a stage for strategic self management technologies are not simple containers for the storage of expertise, but that they are stages upon

Leonardi, Paul

340

Strategic plan for oil shale siting reresearch. Proceedings of a planning exercise, November 4-5, 1985, Denver, Colorado  

SciTech Connect

A strategic planning exercise on environmental research and policy to guide oil shale development was held in November 1985. Seventeen participants representing a cross section of interests and technical disciplines identified, from almost 200 suggested issues, 13 strategic issues in four general categories: policy, source characterization and pollutant generation, transport and impact, and risk assessment. The group reached a consensus on the technical objective for each issue and recommendations to address the objective. Each participant has at least several years' experience in some phase of oil shale endeavor. Therefore, a consensus from this group can be a valuable guide for agencies seeking to develop the oil shale resource while also protecting the environment and public health. This document is an attempt to concisely state the issues discussed by the group and thereby serve as a planning guide for oil shale environmental research.

Hinman, G.; Barr, S.; Peterson, E.J.; Williams, M.D. (eds.)

1986-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Strategic planning for mixed class grazing in the Edwards Plateau  

E-Print Network (OSTI)

. Jerry W. Stuth A rational planning method to allocate multispecies of large herbivores has been developed. It is based on a linear programming model which allocates resources such as forage, capital and labor to an optimal mix of livestock and deer... solution, considering white-tailed deer. The different solutions were obtained by altering available forage. A quick and accurate field evaluation technique was tested. The procedure is based on a combined dry weight rank, comparative yield and shrub...

Field, Eduardo Howard

2012-06-07T23:59:59.000Z

342

Overview of the Hanford risk management plan  

SciTech Connect

The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

Halverson, T.G.

1998-03-26T23:59:59.000Z

343

Steps to Developing the New Orleans Strategic Energy Plan (Presentation), National Renewable Energy Laboratory (NREL)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steps to Developing the New Orleans Steps to Developing the New Orleans Strategic Energy Plan Elizabeth Brown National Renewable Energy Laboratory New Orleans City Council Utility Subcommittee Meeting January 17, 2008 NREL/PR-7A20-51650 National Renewable Energy Laboratory Only national laboratory dedicated to renewable energy and energy efficiency R&D Research spans fundamental science to technology to policy and market solutions New Orleans Support: Funded by U.S. DOE to provide technical and policy expertise to assist in developing energy strategies for recovery and rebuild - Schools - Residential - Municipal - Energy Policy Presentation Overview * Strategic energy planning: why and how? * Next Steps for New Orleans Strategy Development * Suggestions for immediate implementation * Next steps for immediate implementation

344

Strategic Plan for Groundwater Monitoring at the Waste Isolation Pilot Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP-03-3230 WIPP-03-3230 Strategic Plan for Groundwater Monitoring at the Waste Isolation Pilot Plant February 2003 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 03-3230 ii DOE/WIPP 03-3230 iii Table of Contents EXECUTIVE SUMMARY ....................................................................................... viii 1. Introduction.................................................................................................... 1 1.1 Overview .................................................................................................. 1 1.2 Historical Perspective .............................................................................. 1 1.2.1 Evolution of the Groundwater-Monitoring Well Network

345

Business Management and Planning (BMP) Division | U.S. DOE Office of  

NLE Websites -- All DOE Office Websites (Extended Search)

Business Business Management and Planning (BMP) Division Business Policy and Operations (BPO) BPO Home Leadership Organization Chart .pdf file (195KB) Business Management and Planning (BMP) Division SC Systems and Operations (SCSO) Division Contact Information Business Policy & Operations U.S. Department of Energy SC-45/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-0192 F: (301) 903-2481 More Information 禄 Business Management and Planning (BMP) Division Print Text Size: A A A RSS Feeds FeedbackShare Page The Business Management and Planning (BMP) Division provides planning, design, implementation, and overall project management for SC mission-support IT Initiatives such as research grants and financial management systems; network modernization; and IT Strategic and Operational

346

UNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT PLAN  

E-Print Network (OSTI)

UNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision.0 Monitoring & Review 15 #12;UCL ASBESTOS MANAGEMENT PLAN Revision 6 Page 3 of 16 POLICY STATEMENT UCL Estates of Asbestos Regulations 2006 Peter Harrison HSMT 3 30-07-10 Revised to merge policy and plan and provide

Saunders, Mark

347

Community Greening: How To Develop A Strategic Energy Plan, Energy Efficiency & Renewable Energy (EERE) (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Use this Information to Use this Information This guide provides an overview of strategic electric- ity planning for communities, using a step-by-step approach to develop the plan. This method has a high chance of success, because it is based on stakeholder buy-in and political commitment. Not all communities will need to follow all steps, but the process is designed to incorporate all parties, maximize solution-based thinking, and develop a plan that can be carried out by community leaders. There are many specific programs and consultancies available to assist in various parts of the planning process. While many are mentioned here, this is neither a comprehensive list nor a specific endorsement of any of the programs. Communities should review their resources and interests when considering the

348

Management Principles | Department of Energy  

Energy Savers (EERE)

Management Principles Management Principles managementprinciples-S-2Poneman---2009-12-02.pdf More Documents & Publications Diversity and Inclusion Strategic Plan 2012 - 2015...

349

Integrated safeguards and security management plan  

E-Print Network (OSTI)

LBNL/PUB-3151 INTEGRATED SAFEGUARDS AND SECURITY MANAGEMENT76SF00098 iv Integrated Safeguards and Security Managementprovided. Appendix A. Safeguards and Security Plan http://

Bowen editor, Sue

2001-01-01T23:59:59.000Z

350

CAN PLAN OR NO CAN PLAN? REVIEW OF NATURAL RESOURCE MANAGEMENT PLANNING IN HAWAI`I  

E-Print Network (OSTI)

CAN PLAN OR NO CAN PLAN? REVIEW OF NATURAL RESOURCE MANAGEMENT PLANNING IN HAWAI`I DAVID DUFFY,* S with planning experts and reviewed current literature to derive 15 criteria that in our opinion were important that reviewed plans only partially fulfilled most criteria. Only five reviewed plans came within 10% of total

Duffy, David Cameron

351

Evolution and Evaluation of the Active Management Area Management Plans  

E-Print Network (OSTI)

on Management Plan Information 29 Municipal 29 Agricultural 30 Industrial 31 Water Budgets 32 Other Summary 46 Appendix C: Tucson AMA 2006 Water Budget 48 Appendix D: Groundwater Management Plan Legislative of the Arizona Groundwater Management Act (GMA), the Arizona Department of Water Resources (ADWR

Fay, Noah

352

LFRG Program Management Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Plan (LFRG PMP) is to establish the LFRG roles and responsibilities, the LFRG management processes, and the transition from DOE Order 5820.2A to DOE Order 435.1. LFRG...

353

Policy Flash 2014-39 Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Scott Clemons of the Strategic Programs Division, Office of Contract Management, at (202) 287-1554 or at Scott.Clemons@hq.doe.gov.

354

PROJECT MANGEMENT PLAN EXAMPLES Project Management Plan Examples  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Plan Examples Management Plan Examples The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The elements table below should be used to navigate to the subject of interest. Elements of Deactivation Project Planning Deactivation Project Key Planning Elements Reference DOE O 430.1A Reference DOE G 430.1-3 DOE G 430.1- 3 Fig. 1 Link to Examples Policy & Operational Decisions, Assumptions and Strategies Includes organizational responsibilities and structure, disposition path, future use of facility, S&S Reqs and plan, hazard elimination or mitigation, NEPA, RCRA, CERCLA, HVAC/lighting service reqs, structural integrity reqs, etc. Sect. 6.e.7.a Sect. 4.1.1 Step 1 1. Example 1

355

Waste Management Quality Assurance Plan  

E-Print Network (OSTI)

PUB-5352, Rev. 6 WM QA Plan Review and approval of changesand review of procedures, work plans, instructions, reports,Plans, Instructions and Reports9 4.1.2 Procedure Review and

Waste Management Group

2006-01-01T23:59:59.000Z

356

Prepared by Dr. Ping Yu To inform strategic information technology planning and workforce education, UnitingCare Ageing  

E-Print Network (OSTI)

Prepared by Dr. Ping Yu To inform strategic information technology planning and workforce education documentation practice. that the workforce is receptive to the opportunities and benefits of a computer utilise computer-based care plans to a certain extent. 路 The time-consuming nature of a paper-based record

Yu, Ping

357

Office of Facilities Planning and Management  

E-Print Network (OSTI)

Office of Facilities Planning and Management Building Best Practices Through Energy Efficiency;Office of Facilities Planning and Management Recycling Plastics All Bottles and Cans Plastic Metal Glass All #1 and #2 Plastics Eg. Some salad containers NO Styrofoam Lab glass (including test tubes

Ford, James

358

Project Management Plan (PMP) for Work Management Implementation  

SciTech Connect

The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

SHIPLER, C.E.

2000-01-13T23:59:59.000Z

359

P04.33. A review of existing methods to specify condition specific prevalence and experience of CAM use in US children: toward a strategic data plan  

Science Journals Connector (OSTI)

To review existing methods to specify condition specific prevalence ... US and begin to specify a strategic data plan to support evaluation of pediatric integrative medicine.

C Bethell; S Stumbo; N Gombojav; C Wilhelm

2012-06-01T23:59:59.000Z

360

Integrated method to create optimal dynamic strategic plans for corporate technology start-ups  

E-Print Network (OSTI)

This thesis presents an innovative method for evaluating and dynamically planning the development of uncertain technology investments. Its crux centers on a paradigm shift in the way managers assess investments, toward an ...

Mikati, Samir Omar

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

E-Print Network 3.0 - archive management workshop Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

Specifications, plus Data Validation Guidelines Quality Management Policy, Roles... Pollution Sponsors Strategic Planning Workshops Ozone and Particulate ... Source: Oak...

362

MA - Office of Management - Energy Conservation Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MA Energy Conservation Plan MA Energy Conservation Plan January 2010 1 Office of Management Office-Level Energy Conservation Plan January 2010 I. BACKGROUND This energy conservation plan represents an effort to reduce energy consumption within Office of Management (MA) office spaces and to increase employee awareness of and participation in energy conservation measures. II. SCOPE The plan and procedures in this document apply to all Office of Management (MA) office suites in the Forrestal and Germantown Facilities as well as the 950 L'Enfant Plaza Building. The actions and procedures set forth in this plan apply to each separate MA office suite as follows: MA-1: 4A-107 MA-43: 1F-039 MA-70: 7E-074 MA-1.1: 7E-028 MA-43: 1F-037 MA-70: 7E-054 MA-30: GH-081 MA-43:

363

ARM - Data Management and Documentation Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

DocumentationData Management and Documentation Plan DocumentationData Management and Documentation Plan Policies, Plans, Descriptions Data Documentation Home Data Sharing and Distribution Policy Data Management and Documentation Plan Data Product Registration and Submission Reading netCDF and HDF Data Files Time in ARM netCDF Data Files Data Archive Documentation ARM Archive's Catalog of Data Streams (Updated monthly) Access to Historical ARM Data More on Understanding and Finding ARM Data Data Quality Problem Reporting Data Management and Documentation Plan Purpose This document describes datastream documentation requirements and standard formatting and naming protocols for both data users and the infrastructure who produce the data. Definitions Baseline Change Request (BCR): Used by the ARM Infrastructure as a process to provide configuration

364

Data Management Plan (outline) The Data Management Plan (DMP) for a proposal is a two-page document that  

E-Print Network (OSTI)

Data Management Plan (outline) The Data Management Plan (DMP to the funder's Data Policy and (2) how the investigator plans to manage the data should cover the following topics: 1. Information about the data 路 Describe

365

2010 Annual Planning Summary for Civilian Radioactive Waste Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Civilian Radioactive Waste Management (CRWM) 2010 Annual Planning Summary for Civilian Radioactive Waste Management (CRWM) Annual Planning Summaries briefly describe the status of...

366

Waste Isolation Pilot Plant, Land Management Plan  

SciTech Connect

To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

Not Available

1993-12-01T23:59:59.000Z

367

U.S. Department of Energy 2012 Strategic Sustainability Performance...  

Office of Environmental Management (EM)

More Documents & Publications 2012 DOE Strategic Sustainability Performance Plan 2013 Strategic Sustainability Performance Plan Executive Order 13514: Comprehensive Federal...

368

Materials Sciences Division Integrated Safety Management Plan  

E-Print Network (OSTI)

..........................................................................................................................................2! 1.1 SAFETY CULTURE .......................................................4! 3. SAFETY RESPONSIBILITY, AUTHORITY, ACCOUNTABILITY AND A JUST CULTURE.........5! 3Materials Sciences Division Integrated Safety Management Plan Revised: February 9, 2012 Prepared by

369

California Groundwater Management Plans | Open Energy Information  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: California Groundwater Management PlansLegal Published NA Year Signed or Took Effect 2014...

370

Safeguards and Security Program Planning and Management  

Directives, Delegations, and Requirements

Establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Cancels: DOE N 473.9 and DOE M 470.1-1

2005-08-26T23:59:59.000Z

371

Safeguards and Security Program Planning and Management  

Directives, Delegations, and Requirements

The manual establishes program planning and management requirements for the Departments Safeguards and Security. Chg 1, dated 3-7-06 Cancels DOE N 473.9, DOE M 470.1-1 Chg 2.

2005-08-26T23:59:59.000Z

372

Draft of the PHENIX Management Plan  

SciTech Connect

The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

Not Available

1994-03-10T23:59:59.000Z

373

Information Resources Management Strategic Plan FY2014-2018  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

authentication, continuous diagnostic and mitigation, and Trusted Internet Connections (TIC), we acknowledge that our current CAP score indicates that we still have a significant...

374

Rangeland Resource Management for Texans: Strategic Planning for Success (Spanish)  

E-Print Network (OSTI)

podr? relacionar con otras metas siempre y cuando no haya otras metas contradicto- rias. Y puede rastrearse porque las UA por a?o anuales se pueden medir cada a?o para ver si se est? cumpliendo la meta. Considerando el Ambiente Cuando haya establecido... brecha se puede cerrar, quiz?s por medio de expansi?n o diversificaci?n, el siguiente paso es desarrollar estrategias ade- cuadas para alcanzar las metas. Este es el nivel de planeaci?n en donde se toman las decisiones operativas diarias. No hay estrate...

Fox, William E.

2004-12-22T23:59:59.000Z

375

One common way - The strategic and methodological influence on environmental planning across Europe  

SciTech Connect

In the last decades the European Union exerted influence on precautionary environmental planning by the establishment of several Directives. The most relevant were the Habitat-Directive, the EIA-Directive, the SEA-Directive and the Water Framework Directive. Comparing these EU policies in the area of environmental precaution it becomes obvious that there is a lot of common ground. Thus, the conclusion seems likely that the European Union, in doing so, has intended to establish general planning concepts through introducing several methodological steps indicated by the regulations. The goal of this article is firstly to point out, which are the common planning principles, converted by methodological elements and secondly examine the consideration of these planning concepts by the implementation and application in the member states. In this context it is analysed whether the connections and divergences between the directives lead to significant differences in the implementation process. To this aim the directives are shortly introduced and significant steps of the processes regulated by them are outlined. In the second steps the national legal implementation in the Alpine states and its consequences for the practical application are discussed. The results show a heterogeneous application of the EU principles. Within the comparative view on the four directives influence and causalities between the national implementation and the practical application were identified, which can be simplified as four types. Since a coherent strategic and methodological concept for improving environmental precaution planning from part of the EU is noticeable, more unity and comparability within the implementation is desirable, particularly in areas with comparable habitats such as the alpine space. Beyond this the trade-off between the directives poses an important task for the future.

Jiricka, Alexandra, E-mail: alexandra.jiricka@boku.ac.a [Institute of Landscape Development, Recreation and Conservation Planning (ILEN), Department of Spatial, Landscape and Infrastructure Science, University of Natural Resources and Applied Life Sciences Vienna, Peter Jordan-Strasse 82, A-1190 Vienna (Austria); Proebstl, Ulrike, E-mail: ulrike.proebstl@boku.ac.a [Institute of Landscape Development, Recreation and Conservation Planning (ILEN), Department of Spatial, Landscape and Infrastructure Science, University of Natural Resources and Applied Life Sciences Vienna, Peter Jordan-Strasse 82, A-1190 Vienna (Austria)

2009-11-15T23:59:59.000Z

376

EXECUTIVESUMMARY The 2013-2018 Strategic Plan builds on the success of previous plans  

E-Print Network (OSTI)

, refining institutional priorities and measuring outcomes as depicted in the updated planning for Florida in the global economy 路 USF will pursue a more secure economic base, greater operational problems. In addition to being an important part of the Tampa Bay economy, USF undertakes ambitious

Meyers, Steven D.

377

2011-2015 Human Capital Management Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This Human Capital Management Plan (HCMP or Plan) shows how we intend to recruit, hire, train, develop, and retain such employees. 2011-2015 Human Capital Management Plan More...

378

Emergency Management: Facility Emergency Plan Template  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory Laboratory Building 219, 274 and 278 SSRL Building Facility Emergency Plan In Case of Emergency 9-911 from a SLAC phone 911 from a non-SLAC phone Then notify SLAC Site Security, Ext. 5555 SLAC Emergency Resources SLAC Site Security 5555 On-site Palo Alto Fire Station Number 7 2776 Conventional and Experimental Facilities 8901 Normal working hours only SLAC Medical Department 2281 Waste Management 2399 Building manager Larry Cadapan Assistant building manager Brian Choi Publication date 02/11/2009 Revision date 02/11/2009 Prepared by Behzad Bozorg-Chami Approved by Larry Cadapan 20 Jun 2007 (updated 30 Jun 2007) SLAC-I-730-0A14J-001-R000 2 of 12 Emergency Management: Facility Emergency Plan Template This facility emergency plan (FEP) contains building-specific emergency information for

379

2011-2015 Human Capital Management Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Office of Legacy Management (LM) needs skilled and engaged staff to accomplish our mission and The Office of Legacy Management (LM) needs skilled and engaged staff to accomplish our mission and carry out our responsibilities to the American people. This (HCMP or Plan) shows how we intend to recruit, hire, train, develop, and retain such employees. Our differs from previous versions not only in enhanced visual appeal (including photos of LM staff and sites) but also in showing direct links between our objectives, strategies, and activities and the human capital issues most important to President Obama's Administration, the Department, and our own management and staff. We thank the LM Management Team and other staff who contributed to and commented on this plan. We all know that for the LM HCMP to succeed we must continually evaluate our progress and adjust our plan

380

StrategicDoing "Strategic doing leads to 'link and  

E-Print Network (OSTI)

and workforce development professionals relied on traditional strategic planning to answer these questions these innovations strategically? Conventional strategic planning does not work well. The process is too rigid, too. The problem is that conventional strategic planning does not work well. It is too slow, inflexible

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan  

SciTech Connect

The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

Fix, N. J.

2008-02-20T23:59:59.000Z

382

Microsoft Word - ContractManagementPlanningDRIVERS.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Drivers for Ineffective and Effective Drivers for Ineffective and Effective Contract Management and Planning Ineffective Contract Management and Planning Effective Contract Management and Planning 1. Top management does not demonstrate a commitment to contract management planning. 2. Contract team members not clear on contract requirements. 3. Contract team members left out of planning process. 4. Lack of coordination and communication amongst the team members. 5. Contract team members not sure of roles, responsibilities, and limitations. 6. Contract team members not clear on how their responsibilities relate, or interact with, other team members. 1. Top management actively demonstrates a commitment to the contract management planning process. 2. Top management mandates training for the

383

Federal Energy Management Program: Renewable Energy Project Planning and  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewable Energy Renewable Energy Project Planning and Implementation to someone by E-mail Share Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Facebook Tweet about Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Twitter Bookmark Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Google Bookmark Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Delicious Rank Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Digg Find More places to share Federal Energy Management Program: Renewable Energy Project Planning and Implementation on AddThis.com... Energy-Efficient Products

384

Tribal Renewable Energy Foundational Course: Strategic Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Energy Planning Tribal Renewable Energy Foundational Course: Strategic Energy Planning Watch the U.S. Department of Energy Office of Indian Energy foundational course...

385

Potential renewable energy resources of the Lerma Valley, Salta, Argentina for its strategic territorial planning  

Science Journals Connector (OSTI)

Renewable energy sources are considered as strategic opportunities to improve the population抯 quality of life, to promote the development of more efficient and equitable economic systems, and to favor environmental sustainability in the territorial planning of Lerma Valley (Salta, Argentina). The mapping in raster format (each pixel having a reference value) of the potential renewable energy sources (solar, wind, biomass, hydraulic, mixed) is essential to define ideal locations for different types of renewable applications, and to plan suitable strategies for its implementation. It is necessary considering environmental diversity and site conditions (topographic, natural resource, infrastructure and service availability, social and economical) of the intervention area. Different methodologies are used for mapping of potential energy resources. Solar radiation is spatialized through the application of statistical regressions between altitude, latitude, precise incident solar radiation records, and radiation data estimated with the Geosol V.2.0. software. The Argentina Map program is used for the wind potential resource modeling. It requires as inputs: a Digital Elevation Model, a land use and cover map (to determine roughness), and measured and/or estimated wind speed and frequency data. The hydroelectric potential for microturbine applications is calculated from the topographic drop and the annual mean flow in cumulative models, through the application of the Idrisi Kilimanjaro檼s runoff tool; while the power densities are compared at the watershed. Biomass potential (at this exploratory stage), is interpreted from the available biomass type (land use and cover map), its energy application availability, and some quantitative indicators associated with the biomass types identified as priority. In conclusion, the renewable energy potential in Lerma Valley is very high and diverse, and its close connection with social杄nvironmental conditions is basic for the creation of energy resource-related territorial plans.

S. Belmonte; V. Nez; J.G. Viramonte; J. Franco

2009-01-01T23:59:59.000Z

386

CRAD, Configuration Management Assessment Plan  

Energy.gov (U.S. Department of Energy (DOE))

The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders.

387

Project Hanford management contract quality improvement project management plan  

SciTech Connect

On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

ADAMS, D.E.

1999-03-25T23:59:59.000Z

388

Federal Energy Management Program: Advanced Technology Planning for Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Advanced Technology Planning for Energy Savings Performance Contracts to someone by E-mail Share Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Facebook Tweet about Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Twitter Bookmark Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Google Bookmark Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Delicious Rank Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Digg Find More places to share Federal Energy Management Program:

389

Water quality management plan for Cherokee Reservoir  

SciTech Connect

The management plan provides an assessment of Cherokee Reservoir's current water quality, identifies those factors which affect reservoir water quality, and develops recommendations aimed at restoring or maintaining water quality at levels sufficient to support diverse beneficial uses. 20 references, 8 figures, 15 tables. (ACR)

Not Available

1984-01-01T23:59:59.000Z

390

Carbon Management and Implementation Plan 1. Background  

E-Print Network (OSTI)

the College's energy efficiency and use of resources by integrating sustainability with corporate strategiesCarbon Management and Implementation Plan 1. Background Energy security and the increasing concentration of greenhouse gases which contribute to climate change are one of the biggest challenges facing us

Chittka, Lars

391

CARTER MAPS PLAN TO MANAGE NUCLEAR WASTE  

Science Journals Connector (OSTI)

CARTER MAPS PLAN TO MANAGE NUCLEAR WASTE ... The first part of the 15-year program will concentrate on locating and characterizing a number of potential repository sites, capable of isolating from the biosphere both defense and commercial high-level nuclear wastes. ...

1980-02-18T23:59:59.000Z

392

Carbon Management Plan 1. Executive summary 5  

E-Print Network (OSTI)

of energy intensive buildings have been constructed, whilst at the same time disposals have concentrated. Background and context 16 4. Carbon management strategy 18 5. Carbon emissions baseline and projections 22 6 Plan interventions 55 Appendix B: Possible future actions 76 #12;4 #12;5 1. EXECUTIVE SUMMARY Foreword

Haase, Markus

393

On Integrating Theories of International Economics in the Strategic Planning of Global Supply Chains and Dynamic Supply Chain Reconfiguration with Capacity Expansion and Contraction  

E-Print Network (OSTI)

of the dissertation deals with the DSCR model with capacity expansion and contraction. The strategic dynamic supply chain reconfiguration (DSCR) problem is to prescribe the location and capacity of each facility, select links used for transportation, and plan...

Lee, Chaehwa

2012-02-14T23:59:59.000Z

394

Nevada Test Site Resource Management Plan  

SciTech Connect

The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

NONE

1998-12-01T23:59:59.000Z

395

Technological transitions and Strategic Niche Management: the case of the hydrogen economy  

Science Journals Connector (OSTI)

There is considerable interest in the prospects for a large-scale transition to hydrogen as an energy source. This paper assesses these prospects through consideration of technological transition theory and especially the likelihood of hydrogen use becoming widespread through Strategic Niche Management (SNM). The paper shows that current niches show few signs of the characteristics that are necessary for niche expansion to the extent required, and concludes that at present hydrogen technologies still need substantial R&D support resulting in a number of scientific breakthroughs before they will become viable in competitive markets.

Paolo Agnolucci; Paul Ekins

2007-01-01T23:59:59.000Z

396

Utah Nonpoint Source Pollution Management Plan | Open Energy...  

Open Energy Info (EERE)

Management Plan Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Utah Nonpoint Source Pollution Management...

397

Bureau of Land Management - Land Use Planning | Open Energy Informatio...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - Land Use Planning Abstract The BLM's Resource Management Plans (Land Use...

398

Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository  

SciTech Connect

If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required for a construction authorization. The LA must also support a licensing proceeding before an Atomic Safety and Licensing Board panel prior to NRC action on any decision to authorize construction. The DOE has established a strategic basis for planning that is intended to provide the framework for development of an integrated plan for activities leading to preparation and submittal of a LA.

Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

2002-02-26T23:59:59.000Z

399

A Spatial Planning and Analysis System for Wildland Fire Management  

E-Print Network (OSTI)

STARFIRE 11/29/2011 A Spatial Planning and Analysis System for Wildland Fire Management Welcome is an advanced and powerful spatial fire management planning and analysis system which is designed to provide visual and analytic support for fire management planning, decisions and communication. The system

400

LFRG Program Management Plan (LFRG PMP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LOW-LEVEL WASTE DISPOSAL FACILITY LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN SEPTEMBER 18, 2000 LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN Jay Rhoderick, Co-Chair William E. Murphie, Co-Chair LFRG Members Joel Case, Idaho Operations Office Frank DiSanza, Nevada Operations Office Doug Hildebrand, Richland Operations Office Randy Janke, Ohio Field Office Bill McMillan, Oak Ridge Operations Office Virgil Sauls, Savannah River Operations Office Jim Orban, Albuquerque Operations Office Andy Wallo, Office of Environment, Safety and Health DOE Headquarters Distribution: David M. Michaels, Assistant Secretary for Environment, Safety and Health, EH-1 Madelyn Creedon, Deputy Administrator for Defense Programs, DP-1 Rose E. Gottemoeller, Deputy Administrator for Defense Nuclear Nonproliferation, NN-1

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

River Protection Project (RPP) Project Management Plan  

SciTech Connect

The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

NAVARRO, J.E.

2001-03-07T23:59:59.000Z

402

E-Print Network 3.0 - area management plan Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Summary: and Wholesaling Management 27647 Airlines and Transportation Management 27649 Ecotourism Planning and Management... Ecotourism Planning and Management (Speak to Stephen...

403

John Day Subbasin Revised Draft Plan March 15, 2005 5. Management Plan  

E-Print Network (OSTI)

John Day Subbasin Revised Draft Plan March 15, 2005 224 5. Management Plan The Management Plan land managers, makes efficient use of resources and respects property rights. The result will be sustainable, resource-based activities that contribute to the social, cultural and economic well

404

Office of the Chief Financial Officer Strategic Plan 2008-2012  

E-Print Network (OSTI)

their budgets and workforce planning. Decision support (datateam is to focus on workforce planning, its alignment with

Various

2008-01-01T23:59:59.000Z

405

Excess Uranium Inventory Management Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Excess Uranium Inventory Management Plan Excess Uranium Inventory Management Plan Excess Uranium Inventory Management Plan The 2013 Excess Uranium Inventory Management Plan describes a framework for the effective management of the Energy Department's surplus uranium inventory in support of meeting its critical environmental cleanup and national security missions. The Plan is not a commitment to specific activities beyond those that have already been contracted nor is it a restriction on actions that the Department may undertake in the future as a result of changing conditions. It replaces an earlier plan issued in 2008 and reflects updated information on the Department of Energy's management and disposition of its excess uranium inventories. Excess Uranium Inventory Management Plan More Documents & Publications

406

Water resource management planning guide for Savannah River Plant  

SciTech Connect

The Water Resource Management Planning Guide provides an outline for the development of a Savannah River Plant Water Resource Management Plan (WRMP) to protect, manage, and monitor the site's water resources. The management plan is based on three principle elements: (1) protection of the water quality, (2) management of the water quantity, and (3) monitoring of the water quality and quantity. The plan will assure that changes in water quality and quantity are identified and that corrective action is implemented as needed. In addition, water management activities within and between Savannah River Plant (SRP) organizations and departments will be coordinated to ensure the proper management of water resources. This document is intended as a guide to suggest goals and objectives that will provide a basis for the development of a water resource plan for SRP. Planning should be flexible rather than rigid, and the plan outlines in this document was prepared to be modified or updated as conditions necessitate. 16 refs., 12 figs.

Hubbard, J.E.; Stephenson, D.E.; Steele, J.L. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Lab.); Gordon, D.E. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Plant)

1988-10-01T23:59:59.000Z

407

int. j. prod. res., 01 June 2004, vol. 42, no. 11, 21972206 Strategic capacity planning in supply chain design for a new market  

E-Print Network (OSTI)

, capacity planning, transportation network design, identification of distributors in the potential marketint. j. prod. res., 01 June 2004, vol. 42, no. 11, 2197颅2206 Strategic capacity planning in supply chain design for a new market opportunity SATYAVEER S. CHAUHANy, RAKESH NAGIz and JEAN-MARIE PROTHy

Nagi, Rakesh

408

Federal Energy Management Program: Portfolio-Based Planning Process for  

NLE Websites -- All DOE Office Websites (Extended Search)

Portfolio-Based Portfolio-Based Planning Process for Greenhouse Gas Mitigation to someone by E-mail Share Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Facebook Tweet about Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Twitter Bookmark Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Google Bookmark Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Delicious Rank Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Digg Find More places to share Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on

409

Massachusetts Ocean Management Plan (Massachusetts) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Massachusetts Ocean Management Plan (Massachusetts) Massachusetts Ocean Management Plan (Massachusetts) Massachusetts Ocean Management Plan (Massachusetts) < Back Eligibility Construction Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Water Buying & Making Electricity Wind Program Info State Massachusetts Program Type Siting and Permitting Provider Executive Office of Energy and Environmental Affairs The Massachusetts Ocean Act of 2008 required the state's Secretary of Energy and Environmental Affairs to develop a comprehensive ocean management plan for the state by the end of 2009. That plan identified certain state waters that are eligible for offshore wind, wave and tidal energy development and other state waters where such development is

410

Sustainable Energy Action Plans: Project Management Intercomparison  

Science Journals Connector (OSTI)

Abstract This paper explores the content of various Sustainable Energy Action Plans (SEAPs) necessary to the Covenant of Mayors. This study has the aim of providing an overview of existing methodologies for the development and implementation of \\{SEAPs\\} by municipalities. As the number and complexity of issues related with energy are very broad, it is very important to know and identify good practices and guidelines to increasing participant municipalities. Based on the methodologies collected in several studies, it is possible to identify key aspects and issues municipalities might consider for the development of their own plan. The SEAP can抰 be only a collection of measures; it must have a coherent strategy with the European and National policies. This study also shows that a good coordinator with project management skills is necessary to overcome obstacles due to the lack of communication or collaboration among the different municipality's departments.

Eurico Vasco Amorim

2014-01-01T23:59:59.000Z

411

The University of Oklahoma OU RETIREMENT PLANS MANAGEMENT COMMITTEE  

E-Print Network (OSTI)

The University of Oklahoma OU RETIREMENT PLANS MANAGEMENT COMMITTEE March 30, 2011 President Boren established the OU Retirement Plans Management Committee to identify ways for OU to help increase its,000 OU employees participating in the retirement savings plans. A transition period to the master

Oklahoma, University of

412

James F. Argue Nuclear Engineering and Planning Manager  

E-Print Network (OSTI)

James F. Argue Nuclear Engineering and Planning Manager Portsmouth Naval Shipyard Naval Sea Systems Command In June of 2003 Mr. Argue was assigned as the Nuclear Engineering and Planning Manager, a Senior Executive position. Mr. Argue is the head of the Nuclear Engineering and Planning Department

413

Tribal Energy Development Operation and Management Best Practices...  

Office of Environmental Management (EM)

hone and revise strategic energy plans, foster and grow management capabilities, create cloud services to store historical data and ensure that succeeding councils have access to...

414

Mixed Waste Focus Area program management plan  

SciTech Connect

This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

Beitel, G.A.

1996-10-01T23:59:59.000Z

415

Safeguards and Security Program Planning and Management  

Directives, Delegations, and Requirements

The manual establishes program planning and management requirements for the Department抯 Safeguards and Security (S&S) Program. Change 2 is a revision to Section M of both the Manual and the CRD to realign the process for establishing deviations from DOE directives containing safeguards and security requirements to reflect established Departmental policy as set forth in DOE O 251.1C. Original publication, 8-26-05; Chg 1, 3-7-06. Canceled by DOE O 470.4B

2005-08-26T23:59:59.000Z

416

Rangeland Drought Management for Texans: Planning: The Key to Surviving Drought  

E-Print Network (OSTI)

This publication outlines the steps that ranchers should take to survive a drought. Those steps include developing a plan for each enterprise of the operation, ranking strategic ranch goals, planning for resource flow, implementing and monitoring...

Hart, Charles R.; Carpenter, Bruce B.

2001-05-02T23:59:59.000Z

417

Quantitative Methods for Strategic and Investment Planning in the Oil-Refining  

E-Print Network (OSTI)

by one refinery Refinery Opera*onal Planning - Simulate the Refining Scenarios Supply Chain Investments Planning - Test the refinery best scenarios

Grossmann, Ignacio E.

418

Water Resource Planning and Management using Motivated Machine JANUSZ STARZYK  

E-Print Network (OSTI)

1 Water Resource Planning and Management using Motivated Machine Learning JANUSZ STARZYK School@ohio.edu Abstract Water resources planning and management require problem resolution and optimized use of resources. Since many objectives in water management are conflicting, it is hard to devise one optimum strategy

Starzyk, Janusz A.

419

8 Management Plan 8.1.1 Introduction  

E-Print Network (OSTI)

management and use of natural resources including reliable water supplies, fish and wildlife populations145 8 Management Plan 8.1.1 Introduction The information below will be used by subbasin planners that will aid in the recovery of focal species. The management plan is made up of five components: the vision

420

Arid Lands Ecology Facility management plan  

SciTech Connect

The Arid Lands Ecology (ALE) facility is a 312-sq-km tract of land that lies on the western side of the Hanford Site in southcentral Washington. The US Atomic Energy Commission officially set aside this land area in 1967 to preserve shrub-steppe habitat and vegetation. The ALE facility is managed by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) for ecological research and education purposes. In 1971, the ALE facility was designated the Rattlesnake Hills Research Natural Area (RNA) as a result of an interagency federal cooperative agreement, and remains the largest RNA in Washington. it is also one of the few remaining large tracts of shrub-steppe vegetation in the state retaining a predominant preeuropean settlement character. This management plan provides policy and implementation methods for management of the ALE facilities consistent with both US Department of Energy Headquarters and the Richland Field Office decision (US Congress 1977) to designate and manage ALE lands as an RNA and as a component of the DOE National Environmental Research Park System.

None

1993-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Management and operating contractor plan for transition to the project Hanford Management Contractor  

SciTech Connect

This is Revision 1 to the M{ampersand}O Contractor Plan for Transition to the Project Hanford Management Contractor.

Waite, J.L., Westinghouse Hanford

1996-06-27T23:59:59.000Z

422

Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1  

SciTech Connect

In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

NONE

1995-09-01T23:59:59.000Z

423

Systems Engineering Management Plan for the Tank Farm Contractor  

SciTech Connect

This plan describes the systems engineering process to develop and manage the technical baseline. It defines the documents, interfaces, and procedures used by the Tank Farm Contractor.

O'TOOLE, S.M.

2000-04-20T23:59:59.000Z

424

U.S. Department of Energy 2014 Strategic Sustainability Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2014 Strategic Sustainability Performance Plan U.S. Department of Energy 2014 Strategic Sustainability Performance Plan Document displays the U.S. Department of Energy's 2014...

425

16.2 - Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 16.2 (July 2012) Chapter 16.2 (July 2012) 1 Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non- Management and Operating Contracts [Reference: FAR 6, FAR 16, FAR 22, FAR 32, FAR 46, DEAR 915.404-4-72, DEAR 916.405-2, DEAR 970.1504-1, and Acquisition Guide Chapter 16.1] Overview The policy of the DOE is to maximize contractor performance and to align costs with performance through the use of performance-based management as a strategic contract management tool to plan for, manage, and evaluate contractor performance. An important function of contract administration is the ability, or the opportunity, to manage the environment within which the contracted effort is proceeding and, most importantly, to facilitate adjustments to that effort to meet the demand and changes as

426

Fermilab | Directorate | Office of Integrated Planning & Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Integrated Planning & Performance Management (IPPM) Office of Integrated Planning & Performance Management (IPPM) Integrated Planning Diagram Integrated Planning Diagram [Download PPT] Mission: The Office of Integrated Planning and Performance Management (IPPM) within the Fermilab Directorate provides systems and management processes for institutional planning and performance assessment and evaluation. The office of IPPM leads multi-year, forward-looking planning and integration of institutional plans, programs, projects, operations and budgets. In addition it develops, implements and maintains integrated laboratory systems and management processes for strategic planning and goal setting, project and program oversight, enterprise risk management and performance planning and oversight. IPPM Facilitates:

427

Idaho National Laboratory Cultural Resource Management Plan  

SciTech Connect

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

Lowrey, Diana Lee

2009-02-01T23:59:59.000Z

428

Idaho National Laboratory Cultural Resource Management Plan  

SciTech Connect

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

Lowrey, Diana Lee

2011-02-01T23:59:59.000Z

429

Idaho National Laboratory Cultural Resource Management Plan  

SciTech Connect

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

Julie Braun Williams

2013-02-01T23:59:59.000Z

430

OSTI Strategic Plan | OSTI, US Dept of Energy, Office of Scientific...  

Office of Scientific and Technical Information (OSTI)

An extremely exciting element of the Plan is implementation of public access to the peer-reviewed scholarly publications resulting from DOE R&D funding. This Plan is intended...

431

Sustainable Management of Materials Products and Services an Approach to Strategic LCA.  

E-Print Network (OSTI)

??This paper outlines the need for a more structured and simplified Life Cycle Assessment approach called Strategic LCA. It builds on a previously published (more)

Ny, Henrik; Broman, G鰎an; MacDonald, Jamie; Yamamoto, Ryoichi

2004-01-01T23:59:59.000Z

432

Development of the Office of Civilian Radioactive Waste Management National Transportation Plan  

SciTech Connect

The Director of the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) designated development of the National Transportation Plan (NTP) as one of his four strategic objectives for the program. The Office of Logistics Management (OLM) within OCRWM was tasked to develop the plan, which will accommodate state, local, and tribal concerns and input to the greatest extent practicable. The plan will describe each element of the national transportation system that OCRWM is developing for shipping spent nuclear fuel and high-level radioactive waste to the proposed geologic repository at Yucca Mountain, Nevada. The plan will bring together OCRWM's approach for acquiring capital assets (casks, rail cars, and a rail line in Nevada) and its operational planning efforts in a single, comprehensive document. It will also provide a timetable for major transportation decisions and milestones needed to support a 2017 start date for shipments to the Yucca Mountain repository. The NTP will be revised to incorporate new developments and decisions as they are finalized. This paper will describe the elements of the NTP, its importance in providing a comprehensive overview of the national transportation system, and the role of stakeholders in providing input on the NTP and the national transportation system. (authors)

Macaluso, C. [U.S. Department of Energy, Office of Civilian Radioactive Waste Management, Washington, DC (United States); Offner, J.; Patric, J. [Booz Allen Hamilton, Washington, DC (United States)

2008-07-01T23:59:59.000Z

433

Mitch S. Daugherty Nuclear Engineering and Planning Manager  

E-Print Network (OSTI)

Mitch S. Daugherty Nuclear Engineering and Planning Manager Naval Sea Systems Command, Norfolk Naval Shipyard Mitch Daugherty is the Nuclear Engineering and Planning Manager and the senior civilian. Daugherty also headed the Nuclear Refueling Division, the Nuclear Test Engineering Division, and the Nuclear

434

Strategic plan for the Persian Gulf region: Options for deterring and/or defeating an emerging threat. Master's thesis  

SciTech Connect

The Persian Gulf region is, in all likelihood, going to remain crucial to American interests through the next several decades. The world depends on the petroleum reserves of the Gulf region to fuel its economic engine. The recent history of the region has been rife with conflict, and the U.S. has had to intervene militarily on several occasions to ensure its vital interests were protected. This thesis examines the strategic circumstances in the Gulf region and ways in which American political, diplomatic, and military policy can help shape the environment to conform to its interests. Several scenarios are developed which attempt to forecast the results of different environments on regional stability. The thesis reaches the conclusion that the United States must take a proactive role if its short- and long-term interests are to be protected. The short-term goal of U.S. policy must be to maintain a balance of power and regional correlation of forces which serves to deter any would-be aggressor nations. In the long run, the United States must seek a comprehensive regional peace. Various methods of achieving these goals are examined....Persian Gulf, Arms Proliferation, Strategic Planning, Gulf Cooperation Council, GCC, Regional Deterrence, Middle East, Arms Control, Scenario Development, Iraq, Iran, Saudi Arabia, Regional Security Strategy.

Ward, M.W.

1992-12-17T23:59:59.000Z

435

National Aeronautics and Space Administration -1 NASA 2012 Strategic Sustainability Performance Plan  

E-Print Network (OSTI)

-performance sustainable buildings; 路 utilize power management options and reduce the number of Agency data centers

Waliser, Duane E.

436

SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning  

E-Print Network (OSTI)

Planning Tools from Morehead A Word about Morehead's Workforce Commitment Model Technical Support Section 2 Activities Appendices Appendix 1 颅 Workforce Commitment Domains Summary Appendix 2 颅 Action Plan Form #12SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning A guide designed to help

Squire, Larry R.

437

iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT MANAGEMENT & ADMINISTRATION - STRIPES * Template - January 30,2009, Version 2 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. Module I - Privacy Needs Assessment Date Departmental Element & Site Name of Information System or IT Project Exhibit Project UIO April 21, 2009 Office of the Chief Financial Officer, Office of Corporate Information Systems, CF-40 Germantown, U.S. Department of Energy, DOE Headquarters, Germantown, hosted in the OCIO's Application Hosting Environment (AHE) in the CA-007 server

438

An Institutional Analysis of Oil and Gas Sector Development and Environmental Management in the Yukon Territory.  

E-Print Network (OSTI)

??This thesis investigates the ways in which oil and gas development priorities and concern for the environment are integrated within strategic planning and management frameworks, (more)

May, Jason C.

2007-01-01T23:59:59.000Z

439

Mission Plan for the Civilian Radioactive Waste Management Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mission Plan for the Civilian Radioactive Waste Management Program Mission Plan for the Civilian Radioactive Waste Management Program Mission Plan for the Civilian Radioactive Waste Management Program Summary In response to the the requirement of the Nuclear Waste Policy Act of 1982, the Office of Civilian Radioactive Waste Management in the Department of Energy (DOE) has prepared this Mission Plan for the Civilian Radioactive Waste Management Program. The Mission Plan is divided into two parts. Part I describes the overall goals, objectives, and strategy for the disposal of spent nuclear fuel and high-level waste. It explains that, to meet the directives of the Nuclear Waste Policy Act, the DOE intends to site, design, construct., and start operating a mined geologic repository by January 31, 1998. The Act specifies that the costs of these

440

Configuration Management Plan for the Tank Farm Contractor  

SciTech Connect

The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

WEIR, W.R.

2000-04-21T23:59:59.000Z

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

INL Site Executable Plan for Energy and Transportation Fuels Management  

SciTech Connect

It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

Ernest L. Fossum

2008-11-01T23:59:59.000Z

442

Comparative Biomedical Sciences Strategic Plan March 21, 2011 The goals of the Department of Comparative Biomedical Sciences will be to seek and obtain excellence  

E-Print Network (OSTI)

1 1 Comparative Biomedical Sciences Strategic Plan March 21, 2011 GOALS The goals of the Department of Comparative Biomedical Sciences will be to seek and obtain excellence in our performance: Developing Leaders in Veterinary and Biomedical Careers: CBS will focus on a learning environment

443

Project Management Plan Examples 1 - 80 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Management Plan Examples 1 - 80 Project Management Plan Examples 1 - 80 Project Management Plan Examples 1 - 80 The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The descriptions below should be used to navigate to the subject of interest. Policy & Operational Decisions, Assumptions and Strategies - Examples 1 & 2 - Includes organizational responsibilities and structure, disposition path, future use of facility, S&S Reqs and plan, hazard elimination or mitigation, NEPA, RCRA, CERCLA, HVAC/lighting service reqs, structural integrity reqs, etc. Facility End State Decisions - Examples 3, 4 & 5 - Includes expected conditions at completion of the deactivation, DOE mission use, extended S&M, decommissioned and/or dismantled, etc.

444

Water Management Plans for Surface Coal Mining Operations (North Dakota) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Plans for Surface Coal Mining Operations (North Management Plans for Surface Coal Mining Operations (North Dakota) Water Management Plans for Surface Coal Mining Operations (North Dakota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State North Dakota Program Type Siting and Permitting A water management plan is required for all surface coal mining operations. This plan must be submitted to the State Engineer of the State Water Commission at the same time a surface mining permit is submitted to the

445

BNL-100708-2013 Cultural Resource Management Plan  

E-Print Network (OSTI)

BNL-100708-2013 Cultural Resource Management Plan for Brookhaven National Laboratory May 2013 of this manuscript, or allow others to do so, for United States Government purposes. #12;Cultural Resource Management Cultural Resources CRC Cultural Resources Coordinator CRM Cultural Resource Management CRMP Cultural

446

Integrating the principles of strategic environmental assessment into local comprehensive land use plans in California  

E-Print Network (OSTI)

environmental assessment. The objective of this study is to examine the ability of local plans to integrate and implement the key SEA principles. This study focuses on increasing the understanding of how and where to integrate environmental impacts...

Tang, Zhenghong

2009-05-15T23:59:59.000Z

447

Low-Temperature, Coproduced, and Geopressured Geothermal Technologies Strategic Action Plan, September 2010  

Energy.gov (U.S. Department of Energy (DOE))

This action plan presents an agenda for GTP恠 Low-Temperature and Coproduced Subprogram to efficiently and effectively leverage its resources in support of the geothermal community恠 goals and priorities.

448

VII. Appendices should include, but not be limited to, the following: A. Strategic Plan  

E-Print Network (OSTI)

C Graduate Student Handbook As yet the department does not have a graduate student handbook, though Plan B. Graduate Course Offerings C. Graduate Student Handbook D. Graduate Student Association(s) E

Rock, Chris

449

Storm Water Management Plan Program (Nebraska) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Storm Water Management Plan Program (Nebraska) Storm Water Management Plan Program (Nebraska) Storm Water Management Plan Program (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Grant Program Provider Natural Resources This legislation implements the National Pollutant Discharge Elimination

450

Natural Resource Management Plan for Brookhaven National Laboratory  

SciTech Connect

This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).

green, T.

2011-08-15T23:59:59.000Z

451

Mississippi Headwaters Planning and Management (Minnesota) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Headwaters Planning and Management (Minnesota) Headwaters Planning and Management (Minnesota) Mississippi Headwaters Planning and Management (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Minnesota Program Type Siting and Permitting Construction and development is restricted and largely prohibited near the

452

Energy Efficiency Improvement and Cost Saving Opportunities for Cement Making. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network (OSTI)

strategic energy management programin a strategic energy management program are depicted inof a strategic energy management program A successful

Worrell, Ernst

2008-01-01T23:59:59.000Z

453

Cost-Efficiency in Water Management Through Demand Side Management and Integrated Planning  

Science Journals Connector (OSTI)

In the context of regional planning for efficient management of water and wastewater, it is crucial ... situation. This consists of measures for water demand side management, comparison of different scenarios of ...

Dr. Ing. Ralf Otterpohl

2008-01-01T23:59:59.000Z

454

Federal Energy Management Program: Plans, Implementation, and Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Plans, Implementation, and Results Plans, Implementation, and Results The U.S. Department of Energy's Federal Energy Management Program (FEMP) works with key individuals to accomplish energy change within organizations, by bringing expertise from all levels of project and policy implementation, to enable Federal agencies to meet energy-related goals and provide energy leadership to the country. This Web page includes links to documents that support the office management process and the results and public benefits that derive from it. Overview Learn more about this EERE office. Plans Discover the plans, budgets, and analyses that set the direction of this office's priorities and activities. Implementation Find out how this office controls, implements, and adjusts its plans and manages its activities.

455

Revised Acquisition Guide Chapter 42.5, Contract Management Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-24 2-24 Date: February 21, 2012 To: Procurement Directors From: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management Subject: Revised Acquisition Guide Chapter 42.5, Contract Management Planning Summary: The Department of Energy (DOE) has been on GAO's High Risk List for the past several years as a result of inadequate contract and project management. Accordingly, the improvement of contract administration is a critical issue for DOE. The Acquisition Guide chapter on Contract Management Planning has been completely revised to address this matter.

456

BLM - Approved Resource Management Plan Amendments/Record of...  

Open Energy Info (EERE)

Approved Resource Management Plan AmendmentsRecord of Decision for Solar Energy Development in Six Southwestern States Jump to: navigation, search OpenEI Reference LibraryAdd to...

457

Economic and Hydrologic Implications of Proposed Edwards Aquifer Management Plans  

E-Print Network (OSTI)

, according to Texas water law, ground water is a property right vested with the land owner. Throughout at least the past two decades, attempts to negotiate voluntary management plans to restrict pumpage have been unsuccessful, even though demand is projected...

Dillon, Carl R.; Jones, Lonnie L.; Williams, R. Lynn; Jordan, Wayne R.; McCarl, Bruce A.

458

Bureau of Land Management - Land Use Planning Handbook | Open...  

Open Energy Info (EERE)

Bureau of Land Management - Land Use Planning Handbook Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Bureau of...

459

Nevada Test Site Resource Management Plan: Annual summary, January 2000  

SciTech Connect

The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

NONE

2000-01-01T23:59:59.000Z

460

U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20032008  

E-Print Network (OSTI)

of Energy (DOE) to characterize one site, at Yucca Mountain in Nevada, to determine its suitability for constructing a repository at Yucca Mountain. As a result, the DOE plans to prepare and submit an application) gaining a better understanding of the potential behavior of a Yucca Mountain repository; (b) developing

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Attachment #03-008 (#1)-A Page 1 Description Strategic Plan Priority  

E-Print Network (OSTI)

Education 1120 Education - Grades PreK-12 Revitalizing Education 1130 Museums, Higher Ed & Prof Comm Safety Mission Enabling 7000 Information Technology Mission Enabling 8100 Policy, Planning & Exec Mgt or 0007 as applicable (See Program Code Definitions) 1137 Higher Edu IT Activities Use 1100 1140 General

462

The mixed waste management facility, FY95 plan  

SciTech Connect

This document contains the Fiscal Year 1995 Plan for the Mixed Waste Management Facility (MWMF) at Lawrence Livermore National Laboratory. Major objectives to be completed during FY 1995 for the MWMF project are listed and described. This report also contains a budget plan, project task summaries, a milestone control log, and a responsibility assignment matrix for the MWMF project.

Streit, R.

1994-12-01T23:59:59.000Z

463

Excess Uranium Inventory Management Plan 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Excess Uranium Inventory Management Plan 2008 Excess Uranium Inventory Management Plan 2008 Excess Uranium Inventory Management Plan 2008 On March 11, 2008, Secretary of Energy Samuel W. Bodman signed a policy statement1 on the management of the U.S. Department of Energy's (DOE) excess uranium inventory (Policy Statement). This Policy Statement provides the framework within which DOE will make decisions concerning future use and disposition of this inventory. The Policy Statement commits DOE to manage those inventories in a manner that: (1) is consistent with all applicable legal requirements; (2) maintains sufficient uranium inventories at all times to meet the current and reasonably foreseeable needs of DOE missions; (3) undertakes transactions involving non-U.S. Government entities in a transparent and competitive manner, unless the Secretary of

464

2012 Annual Planning Summary for Legacy Management  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Legacy Management.

465

Finance and supply management project execution plan  

SciTech Connect

As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

BENNION, S.I.

1999-02-10T23:59:59.000Z

466

U.S. Department of Energy Strategic Plan 13 In 2000, the National Nuclear Security Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 In 2000, the National Nuclear Security Administration (NNSA) was established as a new element within the Department in response to a Congressional mandate to reinvigorate the security posture throughout the nuclear weapons program and to reaffirm the Nation's commitment to maintaining the nuclear deterrence capabilities of the United States. NNSA was chartered to better focus management attention on enhanced security, proactive management practices, and mission focus within the Department's national defense and nonproliferation programs. The Department performs its national security mission involving nuclear weapons and nuclear materials and technology through the NNSA. Over the next six years, the Department will apply

467

Energy Efficiency Improvement and Cost Saving Opportunities for the Petrochemical Industry - An ENERGY STAR(R) Guide for Energy and Plant Managers  

E-Print Network (OSTI)

strategic energy management program. ..in a strategic energy management program are depicted inof a strategic energy management program. Evaluating

Neelis, Maarten

2008-01-01T23:59:59.000Z

468

Energy Efficiency Improvement and Cost Saving Opportunities for the Fruit and Vegetable Processing Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network (OSTI)

Strategic Energy Management Program .Systems A Strategic Energy Management Program Changing howin a strategic energy management program are depicted in

Masanet, Eric

2008-01-01T23:59:59.000Z

469

WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and implementing prescribed burns and fuel reduction projects in the Upton Reserve. Prescribed fire and fuel reduction in locations outside the Upton Reserve will be coordinated through the Natural Resource Management Program at BNL, and done in consultation with FWS. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by FWS, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel.

ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

2003-09-01T23:59:59.000Z

470

Written Statement of David Huizenga Senior Advisor for Environmental Management United States Department of Energy Before the Subcommittee on Strategic Forces Armed Services Committee United States Senate (May 8, 2013)  

Energy.gov (U.S. Department of Energy (DOE))

Senior Advisor David Huizenga represented the Department of Energy抯 (DOE) Office of Environmental Management (EM) before the Subcommittee on Strategic Forces Armed Services Committee United States...

471

Written Statement of David Huizenga Senior Advisor for Environmental Management United States Department of Energy Before the Subcommittee on Strategic Forces Armed Services Committee United States House of Representatives (May 9, 2013)  

Energy.gov (U.S. Department of Energy (DOE))

Senior Advisor David Huizenga represented the Department of Energy抯 (DOE) Office of Environmental Management (EM) before the Subcommittee on Strategic Forces Armed Services Committee United States...

472

A Strategic Program Plan for Fusion Energy Sciences Fusion Energy Sciences  

E-Print Network (OSTI)

, while creating manageable waste and little risk to public safety and health. Making fusion energy a part control a burning plasma that shares the characteris- tic intensity and power of the sun? 路 How can we use capable of producing a self-sustain- ing fusion reaction, called a "burning plasma." It is the next

473

Final Report and Strategic Plan on the Feasibility Study to Assess Geothermal Potential on Warm Springs Reservation Lands. Report No. DOE/GO/15177  

SciTech Connect

In 2005 the Confederated Tribes of Warm Springs Tribal Council authorized an evaluation of the geothermal development potential on the Confederated Tribes of Warm Springs Reservation of Oregon. Warm Springs Power & Water Enterprises obtained a grant from the U.S. Department of Energy to conduct a geological assessment and development estimate. Warm Springs Power & Water Enterprises utilized a team of expert consultants to conduct the study and develop a strategic plan. The resource assessment work was completed in 2006 by GeothermEx Inc., a consulting company specializing in geothermal resource assessments worldwide. The GeothermEx report indicates there is a 90% probability that a commercial geothermal resource exists on tribal lands in the Mt. Jefferson area. The geothermal resource assessment and other cost, risk and constraints information has been incorporated into the strategic plan.

James Manion, Warm Springs Power & Water Enterprises; David McClain, McClain & Associates

2007-05-17T23:59:59.000Z

474

RISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING  

E-Print Network (OSTI)

: 814-863-9958. Fax: 814-865-7846. In the pharmaceutical industry, the optimal management of the newRISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING Michael J. Rogers, Anshuman incorporate a Monte Carlo simulation procedure to a stochastic optimization model (OptFolio) of pharmaceutical

Maranas, Costas

475

Risk Management Plan Electron Beam Ion Source Project  

E-Print Network (OSTI)

, with the appropriate management oversight, can establish the specific approaches to addressing the individual riskRisk Management Plan for the Electron Beam Ion Source Project (EBIS) Project # 06-SC-002 at Brookhaven National Laboratory Upton, NY For the U.S. Department of Energy Office of Science Office

476

Configuration management program plan for Hanford site systems engineering  

SciTech Connect

This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

Kellie, C.L.

1996-03-28T23:59:59.000Z

477

2012 Annual Planning Summary for Fossil Energy, National Energy Technology Laboratory, RMOTC, and Strategic Petroleum Reserve Field Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Fossil Energy, National Energy Technology Laboratory, RMOTC, and Strategic Petroleum Reserve Field Office.

478

Wildland Fire Management Plan for Brookhaven National Laboratory  

SciTech Connect

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.

Green,T.

2009-10-23T23:59:59.000Z

479

Disruption Management ( Operations Research between planning ...  

E-Print Network (OSTI)

G enerally , a disrupted situation or j ust a disruption is a state during the ... T he plan produced by OR-based decision support are to be applied on the day of.

480

State Lands Management Plan Rosemary Hill Observatory  

E-Print Network (OSTI)

resources . . . . . . . . . 21. Plans for Non-renewable Natural and Cultural Resources . . . . 22 and Improvements . . . . . . . . . 4. Proximity to Significant Public Resources . . . . . . . . . . . 5 RESOURCES . . . . . . . . . . . . . . 8. Resources Listed in the Florida Natural Areas Inventory . . . . 9

Slatton, Clint

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Configuration Management Plan for Tank Farm Restoration and Safe Operations Project W-314 [CANCELLED  

SciTech Connect

The W-314 configuration management (CM) plan describes the systems, processes and procedures for implementing CM.

MCGREW, D.L.

2001-01-12T23:59:59.000Z

482

E-Print Network 3.0 - adaptive management plan Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

results for: adaptive management plan Page: << < 1 2 3 4 5 > >> 1 Regional Water Management: Adapting to Uncertain Water Summary: & Implement Management Options Monitor &...

483

CRAD, Configuration Management Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Configuration Management Assessment Plan Configuration Management Assessment Plan CRAD, Configuration Management Assessment Plan Performance Objective: The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders. Criteria: The CM program supports DOE program implementation through the following: It provides the mechanisms for identifying, cataloging, and maintaining the design requirements and design basis (established to satisfy DOE O 420.1 Facility Safety). It carries forward the technical baseline established in the design

484

AFRD EH&S: Integrated Safety Management Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Safety Management Integrated Safety Management The AFRD Integrated Safety Management or ISM Plan is the master document that guides AFRD policies and practices in environment, safety, and health. The guiding principles and core functions (below left) are the key to understanding ISM. Below, right are the topically arranged sections of the AFRD ISM Plan. Depending on your workplace and duties, more than one topic may apply to you. The ISM Plan is updated as of October 2013. Please contact us with any feedback. Guiding Principles Line-management responsibility for safety Clear roles and responsibilities Competence commensurate with responsibilities Balanced Priorities Identification of ES&H standards and requirements Hazard controls (including environmental controls) tailored to work being performed

485

IT Capital Planning Corporate Management Improvement Program (CMIP) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IT Capital Planning Corporate Management Improvement Program (CMIP) IT Capital Planning Corporate Management Improvement Program (CMIP) IT Capital Planning Corporate Management Improvement Program (CMIP) The Corporate Management Improvement Program (CMIP) was initiated by the Department in recognition of the fact that corporate legacy systems that support administrative functions were nearing the end of their life cycles. An investment to replace and modernize severely outdated information technology (IT) systems would prove a much more efficient expenditure of scarce IT dollars than the continued enhancement, maintenance, and operation of legacy systems. CMIP is an initiative to modernize and improve software applications, hardware, and infrastructure which support a wide range of Department-wide IT based business systems. CMIP permits the

486

Strategic Collaboration  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Collaboration Strategic Collaboration We deliver innovation, through an integrated portfolio of R&D work across our key national security sponsoring agencies, enhanced by...

487

University Services Management Services  

E-Print Network (OSTI)

system U Services Finance organized a workforce planning process resulting in a team with better capacity > 3 Primary Services Human Resources Workforce Planning Recruitment and Selection Employee and Labor, and strategic planning efforts. In addition to supporting the University Services enterprise, the Management

Webb, Peter

488

Strategic Energy Planning (Area 1) Consultants Reports to Citizen Potawatomi Nation Federally Recognized Indian Tribe  

SciTech Connect

The assets that Citizen Potawatomi Nation holds were evaluated to help define the strengths and weaknesses to be used in pursuing economic prosperity. With this baseline assessment, a Planning Team will create a vision for the tribe to integrate into long-term energy and business strategies. Identification of energy efficiency devices, systems and technologies was made, and an estimation of cost benefits of the more promising ideas is submitted for possible inclusion into the final energy plan. Multiple energy resources and sources were identified and their attributes were assessed to determine the appropriateness of each. Methods of saving energy were evaluated and reported on and potential revenue-generating sources that specifically fit the tribe were identified and reported. A primary goal is to create long-term energy strategies to explore development of tribal utility options and analyze renewable energy and energy efficiency options. Associated goals are to consider exploring energy efficiency and renewable economic development projects involving the following topics: (1) Home-scale projects may include construction of a home with energy efficiency or renewable energy features and retrofitting an existing home to add energy efficiency or renewable energy features. (2) Community-scale projects may include medium to large scale energy efficiency building construction, retrofit project, or installation of community renewable energy systems. (3) Small business development may include the creation of a tribal enterprise that would manufacture and distribute solar and wind powered equipment for ranches and farms or create a contracting business to include energy efficiency and renewable retrofits such as geothermal heat pumps. (4) Commercial-scale energy projects may include at a larger scale, the formation of a tribal utility formed to sell power to the commercial grid, or to transmit and distribute power throughout the tribal community, or hydrogen production, and propane and natural-gas distribution systems.

Smith, Marvin; Bose, James; Beier, Richard; Chang, Young Bae

2004-12-01T23:59:59.000Z

489

Project management plan for Project W-320, Tank 241-C-106 sluicing  

SciTech Connect

This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987).

Phillips, D.R.

1994-12-01T23:59:59.000Z

490

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network (OSTI)

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management 颅 Park-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management 颅 Park Management 颅 Bachelor of Science [EH

Sheridan, Scott

491

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network (OSTI)

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management 颅 Recreation-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management 颅 Recreation Management 颅 Bachelor

Sheridan, Scott

492

Planning, Budget, and Acquisition | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning, Budget, and Acquisition Planning, Budget, and Acquisition Planning, Budget, and Acquisition The Office of Legacy Management's (LM) Planning, Budget, and Acquisition (PBA) Team performs the following management functions: Plans, develops, and implements improvements in efficiencies of business processes and identifies opportunities for reengineering or restructuring. Plans, develops, and implements strategic planning efforts, which include analyzing the organization's annual and long-term goals and the best approach for achieving those goals. Plans, develops, and implements budget formulation processes to include identifying future spending priorities and assessing the effectiveness of programs. Plans, develops, and implements processes for budget execution, including day-to-day obligations for agency expenditures, invoices, billing

493

Oak Ridge National Laboratory Waste Management Plan. Revision 1  

SciTech Connect

The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

Not Available

1991-12-01T23:59:59.000Z

494

TWRS process engineering data management plan  

SciTech Connect

The Tank Characterization Data Management (TCDM) system provides customers and users with data and information of known and acceptable quality when they are needed, in the form they are needed, and at a reasonable cost. The TCDM mission will be accomplished by the following: (1) maintaining and managing tank characterization data and information based on business needs and objectives including transfer of ownership to future contractors; (2) capturing data where it originates and entering it only once to control data consistency, electronic data and information management shall be emphasized to the extent practicable; (3) establishing data quality standards, and managing and certifying databases and data sources against these standards to maintain the proper level of data and information quality consistent with the importance of the data and information, data obtained at high cost with significant implications to decision making regarding tank safety and/or disposal will be maintained and managed at the highest necessary levels of quality; (4) establishing and enforcing data management standards for the Tank Characterization Database (TCD) and supporting data sources including providing mechanisms for discovering and correcting data errors before they propagate; (5) emphasizing electronic data sharing with all authorized users, customers, contractors, and stakeholders to the extent practicable; (6) safeguarding data and information from unauthorized alteration or destruction; (7) providing standards for electronic information deliverables to subcontractors and vendors to achieve uniformity in electronic data management; and (8) investing in new technology (hardware and/or software) as prudent and necessary to accomplish the mission in an efficient and effective manner.

Adams, M.R.

1997-05-12T23:59:59.000Z

495

Community Energy Stategic Planning Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Community Energy Strategic Planning Resources Technical Assistance Program January 24 th , 2013 2 Agenda 1. Welcome & overview 2. What is a community energy strategic plan and why...

496

Social Impact Management Plans: Innovation in corporate and public policy  

Science Journals Connector (OSTI)

Abstract Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes assessment, management and monitoring to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs.

Daniel M. Franks; Frank Vanclay

2013-01-01T23:59:59.000Z

497

CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

DAVIS, M.

2005-04-01T23:59:59.000Z

498

Management and planning of UAV flight pattern  

E-Print Network (OSTI)

, and action} 锟 Implementation of autonomy in a software decisional architecture online energy autonomy UAV-known, poorly known or unknown 锟 Uncertainties: wind gusts, measurement noise, atmospheric altitude, airspeed management 锟 On-board implementation of the whole control loop {perception, situation assessment, decision

499

Investigation-Derived Waste Management Plan. Revision 2  

SciTech Connect

SRS has implemented a comprehensive environmental program to maintain compliance with environmental regulations and mitigate impacts to the environment. One element of the environmental program is the investigation of inactive waste units. Environmental Investigation-Derived Waste (IDW). IDW may include purge water , soil cuttings, drilling fluids, well pumping test and development water, decontamination solutions, contaminated equipment, and personal protection equipment (PPE). In cases where investigations confirm the presence of contamination and the IDW contains waste constituents in concentrations high enough to be of environmental or health concern, special management procedures are warranted. This IDW Management Plan describes specific SRS initiatives for IDW management. The goal is the development of a plan for prudent management of IDW from environmental investigations that is protective of human health and the environment.

Molen, G.

1995-05-24T23:59:59.000Z

500

Configuration management program plan for Hanford site systems engineering  

SciTech Connect

This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

Hoffman, A.G.

1994-11-14T23:59:59.000Z