Powered by Deep Web Technologies
Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Strategic Planning System for Exotic Game Management  

E-Print Network [OSTI]

STRATEGIC PLANNING SYSTEM FOR EXOTIC GAME MANAGEMENT A Thesis by JEANNE MARIE PETROFES LUBBERING Submitted to the Office of Graduate Studies of Texas ASM University in partial fulfillment of the requirements for the degree of MASTER... OF SCIENCE December 1988 Major Subject: Range Science STRATEGIC PLANNING FOR EXOTIC GAME MANAGEMENT A Thesis by JEANNE MARIE PETROFES LUBBERING Approved as to style and content by: J ry W. uth (Ch ir of Committee) Steve Archer (Member) Duane C...

Lubbering, Jeanne Marie Petrofes

1988-01-01T23:59:59.000Z

2

Strategic Energy Management Plan for the 1990's  

E-Print Network [OSTI]

This paper describes the strategic energy management plan implemented by the Defense Systems and Electronics Group (DSEG) of Texas Instruments (TI) to enable it to meet its energy management challenge into the 1990's. The strategic energy management...

Fiorino, D. P.; Priest, J. W.

1987-01-01T23:59:59.000Z

3

Industrial Engineering & ManagementStrategic Plan 2014-2018  

E-Print Network [OSTI]

Industrial Engineering & ManagementStrategic Plan 2014-2018 College of Engineering, Architecture & Technology #12;Strategic Plan 2014-2018 Industrial Engineering and Management at Oklahoma State University and first Ph.D. in 1960. This School has been represented and led by giants in Industrial Engineering

Piao, Daqing

4

Managing the Transition State for Energy Strategic Planning  

E-Print Network [OSTI]

MANAGING THE TRANSITION STATE FOR ENERGY STRATEGIC PLANNING a Thomas A. Koehler Eastman Kodak Company Rochester, New York ABSTRACT Corporate energy conservation programs have made substantial gains in reducing energy consumption during... the last decade. The responses to survive the mid-1970's global energy uncertainties were made in a crisis environment. Now, there is a transition from energy conservation to energy strategic planning. Energy engineers and managers need to im prove...

Koehler, T. A.

5

The role of strategic planning in emergency management  

SciTech Connect (OSTI)

Rapid technology development, competition for resources, and an increasing awareness of the global community are but a few of the many forces and trends affecting today`s Emergency Management Organizations. Implementing a continuous Strategic Planning process helps an Emergency Management Organization to formulate responses to issues such as those stated above. By continuously monitoring the forces and trends in its environment, the organization is able to succinctly identify its strategic issues and subsequently frame an appropriate infrastructure of goals, objectives, and strategies. Strategic Planning also holds significant potential for the emergency management community at large. The wide range of expertise and the inherent dependencies between Emergency Management Organizations at all levels of government -- including the local, national, and international arenas -- makes the emergency management community an ideal candidate to capitalize on the benefits resulting from joint strategic planning. The identification of common issues, priorities, and requirements provides the foundation for increased resource and information sharing, as well as the formulation of strategic partnerships between organizations to battle common threats.

Douglas, N.B. [National Communications System, Arlington, VA (United States); Harrison, G.T. [Booz, Allen and Hamilton, Inc., McLean, VA (United States)

1995-12-31T23:59:59.000Z

6

International Facility Management Association Strategic Facility  

Broader source: Energy.gov (indexed) [DOE]

Facility Management Association Strategic Facility Planning: A WhIte PAPer Strategic Facility Planning: A White Paper on Strategic Facility Planning 2009 | International...

7

Strategic Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBiSiteNeutronStrategic Plan The strategic planning process1/7/2010

8

Strategic Energy Management Plan For Fort Buchanan, Puerto Rico  

SciTech Connect (OSTI)

This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Strategic Energy Management Plan for the Site. A strategy has been developed with three major elements in mind: 1) development of a strong foundation from which to build, 2) understanding technologies that are available, and 3) exploring financing options to fund the implementation of improvements. The objective of this report is to outline a strategy that can be used by Fort Buchanan to further establish an effective energy management program. Once a strategy is accepted, the next step is to take action. Some of the strategies defined in this Plan may be implemented directly. Other strategies may require the development of a more sophisticated tactical, or operational, plan to detail a roadmap that will lead to successful realization of the goal. Similarly, some strategies are not single events. Rather, some strategies will require continuous efforts to maintain diligence or to change the culture of the Base occupants and their efforts to conserve energy resources.

Parker, Steven A.; Hunt, W. D.

2001-10-31T23:59:59.000Z

9

Strategic Planning for Landowners  

E-Print Network [OSTI]

Strategic Planning for Landowners Risk Management E-146 RM3-12.0 09-08 *Assistant Professor and Extension Economist?Management, and Extension Specialist?Risk Management, The Texas A&M System Strategic planning is a process that provides direction... the bottom up. Managers are also responsible for Jason L. Johnson and Wade Polk* 2 carrying out those required daily tasks. Land- owners are often both manager and employee, which demands a combination of vision and technical aptitude. Steps for Setting...

Johnson, Jason; Polk, Wade

2008-09-16T23:59:59.000Z

10

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout » Staff125,849| OSTI, US Dept ofStrategic Plan Print

11

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout » Staff125,849| OSTI, US Dept ofStrategic Plan

12

Integrating regional strategic transportation planning and supply chain management : along the path to sustainability  

E-Print Network [OSTI]

A systems perspective for regional strategic transportation planning (RSTP) for freight movements involves an understanding of Supply Chain Management (SCM). This thesis argues that private sector freight shippers and ...

Sgouridis, Sgouris P

2005-01-01T23:59:59.000Z

13

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearchScheduled System Burst Buffer Archive Home » R &Strategic

14

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBiSiteNeutron Scattering4American'!StoresStrategicReserve

15

Strategic Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

a single BPA data repository * Data quality improvements * Improve model alignment with WECC planning data * Improve WECC base case coordination * Align the BPA data model with...

16

Strategic Energy Planning Webinar  

Broader source: Energy.gov [DOE]

Attendees will learn about developing a strategic energy plan, identifying key aspects of successful energy planning, and using available information and resources, including archived webinars in...

17

Administrative & Business Services Strategic Plan for 2015 Evolution of A&BS Strategic Plan  

E-Print Network [OSTI]

: Simplification Goals and Principles Human Resources Initiatives, Policies, and Management Skills Development Analysis of Existing "Administrative Culture" Technology Upgrading Plan and Skills Development DelegationAdministrative & Business Services Strategic Plan for 2015 Evolution of A&BS Strategic Plan

Rose, Michael R.

18

Risk Management Procedures Category: Strategic Management  

E-Print Network [OSTI]

/POLICY SUPPORTED Risk Management Policy Tertiary Education Quality Standards Agency Act 2011 (TEQSA Act 2011) 21 Risk Management Procedures Category: Strategic Management 1. LEGISLATION/ENTERPRISE AGREEMENT. PROCEDURAL DETAILS 2.1. Responsibilities Entity / Officer Responsibilities Planning and Management Committee

19

2012 DOE Strategic Sustainability Performance Plan | Department...  

Broader source: Energy.gov (indexed) [DOE]

DOE Strategic Sustainability Performance Plan 2012 DOE Strategic Sustainability Performance Plan The 2012 DOE Strategic Sustainability Performance Plan embodies DOE's...

20

State Energy Strategic Planning  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Supporting Document Strategic Plan  

E-Print Network [OSTI]

1 Supporting Document Strategic Plan 20132020 #12;2 Supporting Document Strategic Plan 2013 more critical to the University's future than was the case in 2005. The purpose of this document are summarised via a SWOT analysis in Appendix 1. This document should therefore be read in conjunction

Auckland, University of

22

Information Resources Management Strategic Plan Appendix FY2014-2018  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA,Fermi NationalBusiness PlanPosting Thomas F.Needs for Energy, 2008Plan

23

Strategic Energy Planning | Department of Energy  

Office of Environmental Management (EM)

Resources Energy Resource Library Strategic Energy Planning Strategic Energy Planning Below are resources for Tribes on strategic energy planning. Alaska Strategic Energy...

24

Information Resources Management Strategic Plan FY2014-2018  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA,Fermi NationalBusiness PlanPosting Thomas F.Needs for Energy,

25

2010 DOE Strategic Sustainability Performance Plan - Report to...  

Broader source: Energy.gov (indexed) [DOE]

10 DOE Strategic Sustainability Performance Plan - Report to the White House Council on Environmental Quality and Office of Management and Budget 2010 DOE Strategic Sustainability...

26

Space Conditioning Standing Technical Committee Strategic Plan...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Committee Strategic Plan Space Conditioning Standing Technical Committee Strategic Plan This strategic plan document outlines the gaps, barriers, and opportunities identified by...

27

NORTHWESTERN UNIVERSITY Information Technology Strategic Plan  

E-Print Network [OSTI]

conferencing technology into the Course Management System, allowing for virtual office hours, easier access mobile device and tablet support to core services of the Course Management SyNORTHWESTERN UNIVERSITY Information Technology Strategic Plan 2012 2014 #12;Information technology

Shull, Kenneth R.

28

Business Services Strategic Plan  

E-Print Network [OSTI]

Business Services Strategic Plan Updated September 2008 New Synergies: Launching Tomorrow's Leaders Discovery with Delivery Meeting Global Challenges Excellence in Business and Support Services #12;Introduction The mission of Business Services at Purdue University is to enable, serve, and support others

Holland, Jeffrey

29

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

30

Strategic Plan Progress Report Prepared by Energy Division,  

E-Print Network [OSTI]

Integrated Demand-Side Management (IDSM)............................................25 9 Workforce, Education of action plans and a Strategic Plan newsletter (described below), have continued to build momentum

31

Guam Strategic Energy Plan  

SciTech Connect (OSTI)

Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

Conrad, M. D.

2013-07-01T23:59:59.000Z

32

CORPORATE AND STRATEGIC PLANNING Faculty planning workbook  

E-Print Network [OSTI]

.............................................................................33 Staffing & workforce planningCORPORATE AND STRATEGIC PLANNING Faculty planning workbook Humanities, Law & Social Studies Outcomes from 2008/09 Confirmation of progress during 2009/10 Faculty planning for 2010/11 ­ 2012/13 #12

33

Strategic Plan: 2014 - 2018  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines About U.S. NaturalA. Michael Schaal Director, Oil and10:InformationSteamStrategic Plan:

34

Strategic Energy Management  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) See Action Network and Weatherization and Intergovernmental Program Technical Assistance Program sponsored this webinar about strategic management in the public sector on November 7, 2012.

35

Office of Information Technology Strategic Planning Process  

E-Print Network [OSTI]

Office of Information Technology Strategic Planning Process June 2012 Marc Hoit, Ph.D. Vice Strategic Planning Process June 2012 Page 2 Office of Information Technology Strategic Planning Process of Information Technology Strategic Planning Process #12;Office of Information Technology Strategic Planning

Liu, Paul

36

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

Authors James Bartridge Judy Grau Mark Hesters Don Kondoleon Chuck Najarian Contributing Authors Grace: Bartridge, James, Judy Grau, Mark Hesters, Don Kondoleon, Chuck Najarian. 2007 Strategic Transmission

37

Linking two modeling approaches for the strategic municipal waste management planning. The MIMES/Waste model and LCA  

SciTech Connect (OSTI)

This paper describes how a systems engineering model for the strategic waste management, the MIMES/Waste model, is improved by using fife cycle assessment (LCA). The MIMES/Waste model, which is an one-step nonlinear optimization model, is designed to facilitate new solutions for future waste management systems that are both cost-efficient and environmentally acceptable. The objective of the model is cost minimization. Emissions control has so far been analyzed by using emissions restrictions and fees. However, emissions control is not sufficient in order to evaluate the environmental impacts from different waste management strategies. The method proposed in this paper shows how a linkage between the two modeling approaches can be used in order to find solutions that minimizes both costs and environmental impacts. Two parts of the MIMES/Waste model is improved by using LCA. The first improvement is to use LCA methodology for describing and comparing environmental impacts. The main improvement here, is the results gained from using the methods for impacts assessment (i.e. classification, characterization and valuation). The integration of the two objectives, the existing cost minimization and the impact assessment, opens new and interesting opportunities for the model since it couples the two main decision criteria used for the strategic planning. The second improvement is to link complete life-cycles for the separated and recovered materials. This expansion of the system boundary makes it possible, for the MIMES/Waste model to compare different material recovery options from an environmental point of view. A procedure with soft linking is used where existing and evaluated LCA descriptions are linked. Results from a case study that illustrates the benefits from using the new model for the strategic planning is presented.

Sundberg, J.; Ljunggren, M. [Chalmers Univ. of Technology, Goeteborg (Sweden). Energy Systems Technology Div.

1997-12-31T23:59:59.000Z

38

[Type a quote from the document or the summary of an interesting point. Juhree's career includes decades of management, consulting, strategic planning, policy  

E-Print Network [OSTI]

[Type a quote from the document or the summary of an interesting point. . Juhree's career includes decades of management, consulting, strategic planning, policy development and coaching at senior levels training has also equipped staff to manage conflict, adapt to new roles and organizational changes

Illinois at Chicago, University of

39

Strategic Plan Update Lydia Pleotis Howell MD  

E-Print Network [OSTI]

diagnostic testing that is tailored to the prevention and management of disease. 4. Develop a culture....where are we at and what have we accomplished?? #12; Maximized resources, efficiency and effectiveness CultureStrategic Plan Update 2014-2015 Lydia Pleotis Howell MD Professor and Chair Pathology

Leistikow, Bruce N.

40

Strategic Plan Update Lydia Pleotis Howell MD  

E-Print Network [OSTI]

diagnostic testing that is tailored to the prevention and management of disease. 4. Develop a culture....where are we at and what have we accomplished?? #12; Maximized resources, efficiency and effectiveness CultureStrategic Plan Update 2013-2014 Lydia Pleotis Howell MD Professor and Chair Pathology

Leistikow, Bruce N.

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

NERSC Strategic Plan Is Now Online  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

long-term planning, the strategic plan discusses NERSC's mission, goals, science drivers, planned initiatives, and technology strategy, among other topics. More NERSC...

42

Strategic Health Workforce Planning  

E-Print Network [OSTI]

May 11, 2013 ... Health workforce planning plays a key role in the United States and ... workforce plans should account for lags implied by training new...

2013-05-11T23:59:59.000Z

43

Strategic Plan | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBiSiteNeutronStrategic Plan The strategic planning process is

44

STRATEGIC PLAN 2011 2016: SUMMARY i. Charter, Mission and Strategic Vision 2  

E-Print Network [OSTI]

and Advocacy Campus People and Culture Finance · The Plan incorporates short, medium and long term performance & Resources Committee, its Senior Management Team, Heads of School and Heads of Departments fora, and a teamSTRATEGIC PLAN 2011 ­ 2016: SUMMARY Contents i. Charter, Mission and Strategic Vision 2 ii

Subramanian, Sriram

45

College of Engineering Strategic Plan  

E-Print Network [OSTI]

, the nation, and the world by graduating talented, broadly educated engineers, conducting high quality-wide strategic plan identifies three dimensions to this priority: Quality, access, and affordability. The College programs. The total educational experience at the University will promote their academic and professional

46

Strategic Planning FrameworkAugust/September 2012 Vision The Office of Academic Affairs will provide leadership in the development and management of the medical curriculum.  

E-Print Network [OSTI]

of education resources and Promote a culture of excellence in the program Present OAA as the gatewayStrategic Planning FrameworkAugust/September 2012 Vision The Office of Academic Affairs will provide leadership in the development and management of the medical curriculum

Gilbert, Matthew

47

Strategic Plan: Implementation and  

E-Print Network [OSTI]

Findings From: Planning Interviews Stakeholder Survey Environmental Assessment Refine Mission and Vision Define Goals with Measurable Outcomes Develop Specific Strategies & Tactics Finalize;Improving lives and transforming healthcare.* Mission Statement ­ "Core Purpose" Vision Statement

Nguyen, Danh

48

January 2011 Strategic Planning Session  

E-Print Network [OSTI]

= bchmk; goal 210 22.6% Annual Annual Facilities Management FY 2011 Balanced Scorecard STRATEGIC THEMES; Budget 6.1.1 Balanced Budget @ End of Year 100% Maximize Revenue Sustainability goals 50% 40% Conserve Natural Resources 6.3.1 Energy Usage by 2015 30% 0% Improve HUB

Howitt, Ivan

49

Environmental Education Strategic Plan  

SciTech Connect (OSTI)

This document is designed to guide the Environmental Education and Development Branch (EM-522) of the EM Office of Technology (OTD) Development, Technology Integration and Environmental Education Division (EM-52) in planning and executing its program through EM staff, Operations Offices, National Laboratories, contractors, and others.

none,

1991-12-01T23:59:59.000Z

50

UNH Office of Environmental Health & Safety Strategic Plan  

E-Print Network [OSTI]

FY2015-2019 The Office of Environmental Health and Safety strategic plan for FY 2015-2019 contains two parts: Part 1 consists of goals. § Ascertain if the Hazardous Waste Management budget is sufficient

New Hampshire, University of

51

UHUH''ss Strategic PlanningStrategic Planning Overview, 2005Overview, 20050909  

E-Print Network [OSTI]

going rate (2-yr, 4-yr) · Job shortages (workforce needs) UH's Strategic Planning Overview, 2005­09 APPUHUH''ss Strategic PlanningStrategic Planning Overview, 2005Overview, 2005­­0909 Linda K. Johnsrud Vice President for Academic Planning & Policy Board of Regents Meeting September 17, 2009 UH

Dong, Yingfei

52

Major Efforts 2010-2015 Strategic Plan  

E-Print Network [OSTI]

pay syste o acu ty · FY12 OMB submission and FY12 budget planning · Enrollment planning #12;#12;Major Efforts · 2010-2015 Strategic Plan · Trustees approved at Sep meeting · http

Bieber, Michael

53

The New Approach to Strategic Energy Planning  

E-Print Network [OSTI]

THE NEW APPROACH TO STRATEGIC ENERGY PLANNING N. RICHARD FRIEDMAN Chairman Resource Dynamics Corporation Vienna, Virginia ABSTRACT The changing industrial energy market is placing a new emphasis on the strategic element of energy... planning. No longer a "lowest-cost analysis" discipline, successful energy planning today involved a sophisticated approach that integrated energy decisions into the development of overall corporate business strategy. The integration of strategic...

Friedman, N. R.

54

Strategic Plans | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehicles »ExchangeDepartmentResolveFuture |Energy StepsStrategic Plans

55

Sandia National Laboratories: Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmitted for US PatentOperationalforRenewable SystemsStrategic Plan About

56

Carlsbad Area Office strategic plan  

SciTech Connect (OSTI)

This edition of the Carlsbad Area Office Strategic Plan captures the U.S. Department of Energy`s new focus, and supercedes the edition issued previously in 1995. This revision reflects a revised strategy designed to demonstrate compliance with environmental regulations earlier than the previous course of action; and a focus on the selected combination of scientific investigations, engineered alternatives, and waste acceptance criteria for supporting the compliance applications. An overview of operations and historical aspects of the Waste Isolation Pilot Plant near Carlsbad, New Mexico is presented.

NONE

1995-10-01T23:59:59.000Z

57

NERSC Strategic Implementation Plan 2002-2006  

SciTech Connect (OSTI)

This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

2002-09-01T23:59:59.000Z

58

Sustainability Strategic Plan College of Social Sciences  

E-Print Network [OSTI]

Sustainability Strategic Plan College of Social Sciences San José State University Fall 2010 #12;Rachel O'Malley Faculty in Residence for Sustainability College of Social Sciences San José State University July 30, 2010 Sustainability Strategic Plan College of Social Sciences, San José State University

Su, Xiao

59

NNSA Strategic Performance Evaluation Plan (PEP) FOR MANAGEMENT AND OPERATION OF  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNational Nuclear SecurityNationalApplyMaintainingNuclear SecurityMANAGEMENT AND

60

2006 Department of Energy Strategic Plan - Environmental Responsibilit...  

Energy Savers [EERE]

06 Department of Energy Strategic Plan - Environmental Responsibility 2006 Department of Energy Strategic Plan - Environmental Responsibility The scope of the Department's...

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Test Methods Standing Technical Committee Strategic Plan - February...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Strategic Plan - February 2012 Test Methods Standing Technical Committee Strategic Plan - February 2012 This document outlines gaps, needs, and opportunities identified by the...

62

Study of the role of Strategically Managed Inventory (SMI) in the Caterpillar supply chain  

E-Print Network [OSTI]

Strategic Managed Inventory (SMI) is an inventory replenishment process deployed by Caterpillar that blends elements of Vendor Managed Inventory (VMI) and Collaborative Planning, Forecasting, and Replenishment (CPFR). The ...

Rowan, Brandon (Brandon Christopher)

2012-01-01T23:59:59.000Z

63

WVU School of Public Health: 2020 Strategic Plan 2020 | Strategic PlanWVU School of Public Health  

E-Print Network [OSTI]

WVU School of Public Health: 2020 Strategic Plan 1 2020 | Strategic PlanWVU School of Public Health #12;WVU School of Public Health: 2020 Strategic Plan 2 Contents Message from the Dean 3 Vision Plan 12 #12;WVU School of Public Health: 2020 Strategic Plan 3 Message from the Dean The School

Mohaghegh, Shahab

64

UTHSC College of Nursing Strategic Plan Goals  

E-Print Network [OSTI]

a design process for the Crowe Building that realizes CON's strategic needs 5.3 Secure diverse financial.5 Strengthen the PhD program through increased faculty research Strategic Initiative: Integrated Faculty Practice 4.1 Redesign Faculty Practice Plan to better facilitate the integration of practice, research

Cui, Yan

65

Planning Tool for Strategic Evaluation of Facility Plans - 13570  

SciTech Connect (OSTI)

Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

Magoulas, Virginia; Cercy, Michael [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States)] [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States); Hall, Irin [Newport News Shipbuilding, 4101 Washington Ave., Newport News, VA 23607 (United States)] [Newport News Shipbuilding, 4101 Washington Ave., Newport News, VA 23607 (United States)

2013-07-01T23:59:59.000Z

66

Online Money Management Tools for Students Borrow strategically  

E-Print Network [OSTI]

Online Money Management Tools for Students Borrow strategically Direct Loan program: studentloans.com/CreditEducation/WhatsInYourScore.aspx What you need to know about your credit: ftc.gov/gettingcredit Manage your personal finances Money management: onestop.umn.edu/finances/manage_money Planning your financial life: mymoney.gov Identity Theft

Weinberger, Hans

67

University of Georgia 2020 Strategic Plan  

E-Print Network [OSTI]

......................................................................34 Appendix E. University of Georgia Funding Source Trend Summary..........................................35University of Georgia 2020 Strategic Plan Building on Excellence October 30, 2012 #12;Building...............................................................................................................................................1 The Mission of the University of Georgia

Arnold, Jonathan

68

Strategic Plan Department of Physics and Astronomy  

E-Print Network [OSTI]

1 Strategic Plan Department of Physics and Astronomy University of Tennessee, Knoxville Fall 2011)........................................................... 46 #12;3 Introduction The Department of Physics and Astronomy has over the last two decades had

Dai, Pengcheng

69

Strategic Plan Department of Physics and Astronomy  

E-Print Network [OSTI]

Strategic Plan Department of Physics and Astronomy University of Tennessee, Knoxville September (Ex Officio), and Hanno Weitering #12;Introduction The Department of Physics and Astronomy has over. Figure 1: Schematic diagram illustrating the Department of Physics and Astronomy's interactions

Dai, Pengcheng

70

UNIVERSITY OF SASKATCHEWAN Strategic Research Plan Summary  

E-Print Network [OSTI]

UNIVERSITY OF SASKATCHEWAN Strategic Research Plan Summary Canada ResearchChairs Program, Canada provinceofSaskatchewan,inits academic programs and the qualityof the learning environment of Saskatchewan has established an international reputation for achievement in a diversity of disciplines

Patterson, William P.

71

UNIVERSITY OF SASKATCHEWAN Strategic Research Plan  

E-Print Network [OSTI]

UNIVERSITY OF SASKATCHEWAN Strategic Research Plan Canada ResearchChairs Program, Canada Excellence provinceofSaskatchewan,inits academic programs and the qualityof the learning environment of Saskatchewan has established an international reputation for achievement in a diversity of disciplines

Patterson, William P.

72

Technology Support Strategic Plan MISSION STATEMENT  

E-Print Network [OSTI]

1 Technology Support Strategic Plan MISSION STATEMENT Through collaboration and professionalism, the Technology Support Department provides the highest possible quality Information Technology (IT) services, support, and assistance to the University community. VISION STATEMENT Technology Support

Westfall, Peter H.

73

Workforce Management Office WORKFORCE AND SUCCESSION PLANNING  

E-Print Network [OSTI]

2012 Workforce Management Office NOAA 1/1/2012 WORKFORCE AND SUCCESSION PLANNING Toolkit to Identify and Address Strategic Talent Gaps #12;Workforce & Succession Planning Toolkit NOAA Workforce .......................................................................................................3 Workforce Planning

74

Performance Management Plan  

SciTech Connect (OSTI)

This Performance Management Plan describes the approach for accelerating cleanup activities of U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Management (EM) Program. This approach accelerates the reduction of risk at NNSA/NV sites while performing the work responsibly, effectively, and more efficiently. In May 2002, NNSA/NV EM and the Nevada Division of Environmental Protection signed a Letter of Intent formalizing an agreement to pursue accelerated risk reduction and cleanup for activities within the State of Nevada. This Performance Management Plan provides the strategic direction for implementing the Letter of Intent.

IT Corporation, Las Vegas, NV

2002-08-21T23:59:59.000Z

75

Library strategic plan -April 2009.docx[Type text] Page 1 Library Strategic Plan  

E-Print Network [OSTI]

Library strategic plan - April 2009.docx[Type text] Page 1 Library Strategic Plan I. Division/School Core Purpose The Library's mission is to make available a comprehensive collection of scholarly of Charleston Library, the Avery Research Center, and the Marine Resources Library have forged formal

Kunkle, Tom

76

1997 U.S. Department of Energy Strategic Plan  

SciTech Connect (OSTI)

With the end of the Cold War and the election of President Clinton, the Department of Energy (DOE) set a new course which began with the publication of its first departmental strategic plan in April 1994. Entitled ``Fueling a Competitive Economy, it provided the framework and shared vision for meeting responsibilities in energy, national security, environmental quality, and science and technology. The strategic plan was the guidepost for the formulation of the Department`s FY 1996, FY 1997, and FY 1998 budgets and was critical to the development of the Department`s Strategic Alignment Initiative, designed to save $1.7 billion over five years. This current plan, which has been significantly improved through a very close consultation process with Congress and customers stakeholders, takes DOE to the next important performance level by being more directly linked to actions and results. It defines a strategic goal for each of the Department`s four business lines and, in the spirit of the Government Performance and Results Act and the National Performance Review, identifies a fifth goal addressing corporate management. Reengineering the business practices, managing for results, being open with neighbors and stakeholders, and ensuring the safety and health of DOE workers and the public are, and will continue to be, among the highest of priorities. Over the coming years, DOE plans to achieve their strategic goals through specific identifiable strategies. Each business line has clear objectives and straightforward ways of defining whether DOE has succeeded in meeting those objectives.

None,

1997-09-01T23:59:59.000Z

77

Strategic Plan 2012 Update Based on  

E-Print Network [OSTI]

colleges include: · Agricultural Sciences · Applied Human Sciences · Business · Engineering · Liberal Arts · Warner College of Natural Resources · Natural Sciences · Veterinary Medicine and Biomedical Sciences Planning Area 3: Outreach and Engagement ....... 19 Strategic Planning Area 4: Sustainability

78

2011 Strategic Plan | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data CenterEnergyAuthorizationSunShot Initiative1 Strategic Plan 2011 Strategic

79

Windward Community College Strategic Plan  

E-Print Network [OSTI]

.......................................................1 II. DESCRIPTION OF THE COLLEGE PLANNING PROCESS.......................................3 A with career exploration, technolo

80

Strategic Planning | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: AlternativeEnvironment,Institutes and1 Special Report:Step by Step InstructionStrategic

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Agricultural Sciences Strategic Plan 20082013  

E-Print Network [OSTI]

Actions 15 Facilities and Land--Progress and Further Planning 24 FiveYear Recycling Plan and Program.This daring concept has led to a nationwide system of colleges and universities that create new knowledge

Kaye, Jason P.

82

Strategic Plan for 2020 Department of Economics  

E-Print Network [OSTI]

Strategic Plan for 2020 Department of Economics E. J. Ourso College of Business MISSION AND VISION The mission of the Department of Economics is to enhance the reputation of the Department, the College scholars and teachers. Our vision is to be recognized as an excellent and nationally recognized economics

83

Information Technology Services (ITS) Strategic Plan  

E-Print Network [OSTI]

Information Technology Services (ITS) Strategic Plan Release Date August 2010 Empowering the University This is a document intended to guide strategy and operations for information technology at Dalhousie University. It will provide a framework for ITS and information technology deployed and used

Brownstone, Rob

84

Wisconsin Strategic Highway Safety Plan 2011 2013  

E-Print Network [OSTI]

will also play key roles in establishing and nurturing a culture of highway safety values in the BadgerWisconsin Strategic Highway Safety Plan 2011 ­ 2013 Published by the Wisconsin Department of Transportation Mark Gottlieb, P.E., Secretary Wisconsin DOT Traffic Safety Council #12;Zero in Wisconsin ­ Any

Sheridan, Jennifer

85

Strategic Plan The School of Engineering  

E-Print Network [OSTI]

of knowledge of the field of engineering, and assist in the economic development of the state and nation; and 310-Year Strategic Plan 2003-2013 The School of Engineering at the University of Kansas KU School of Engineering 1 Eaton Hall (785) 864-2930 (voice) (785) 864-5445 (fax) sbell@ku.edu #12;Executive Summary

86

DOE/El+0664 Strategic Plan  

E-Print Network [OSTI]

activities of the International Thermonuclear Experimental Reactor program, ITER. This restructured fusionDOE/El+0664 Strategic Plan for the Restructured U.S. Fusion Energy Sciences Program August 1996 U. S. Department of Energy Office of Energy Research Office of Fusion Energy Sciences Germantown, MD

87

National Wetlands Inventory Draft Strategic Plan  

E-Print Network [OSTI]

National Wetlands Inventory Draft Strategic Plan: Conserving America's Wetlands for Future America's Wetlands for Future Generations Cover Photo: Blackwater National Wildlife Refuge, on Virginia's Chesapeake Bay, showing combined climate change and other impacts on wetlands, with dead or dying trees from

Gray, Matthew

88

Community Energy Strategic Planning Resources  

Broader source: Energy.gov [DOE]

Presentation for the Community Energy Stategic Planning Resources webinar, presented on January 24, 2013 as part of the U.S. Department of Energy's Technical Assistance Program (TAP).

89

DOE Awards Management and Operating Contract for DOE's Strategic...  

Energy Savers [EERE]

DOE Awards Management and Operating Contract for DOE's Strategic Petroleum Reserve DOE Awards Management and Operating Contract for DOE's Strategic Petroleum Reserve September 18,...

90

Strategic Energy Planning | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from the GridwiseSiteDepartment ofCreatingCellStrategic Energy PlanningStrategic

91

Robinson Rancheria Strategic Energy Plan; Middletown Rancheria Strategic Energy Plan, Scotts Valley Rancheria Strategic Energy Plan, Elem Indian Colony Strategic Energy Plan, Upperlake Rancheria Strategic Energy Plan, Big Valley Rancheria Strategic Energy Plan  

SciTech Connect (OSTI)

The Scotts Valley Band of Pomo Indians is located in Lake County in Northern California. Similar to the other five federally recognized Indian Tribes in Lake County participating in this project, Scotts Valley Band of Pomo Indians members are challenged by generally increasing energy costs and undeveloped local energy resources. Currently, Tribal decision makers lack sufficient information to make informed decisions about potential renewable energy resources. To meet this challenge efficiently, the Tribes have committed to the Lake County Tribal Energy Program, a multi Tribal program to be based at the Robinson Rancheria and including The Elem Indian Colony, Big Valley Rancheria, Middletown Rancheria, Habematolel Pomo of Upper Lake and the Scotts Valley Pomo Tribe. The mission of this program is to promote Tribal energy efficiency and create employment opportunities and economic opportunities on Tribal Lands through energy resource and energy efficiency development. This program will establish a comprehensive energy strategic plan for the Tribes based on Tribal specific plans that capture economic and environmental benefits while continuing to respect Tribal cultural practices and traditions. The goal is to understand current and future energy consumption and develop both regional and Tribe specific strategic energy plans, including action plans, to clearly identify the energy options for each Tribe.

McGinnis and Associates LLC

2008-08-01T23:59:59.000Z

92

Strategic Planning Notes MT AHEC/MORH Advisory Board  

E-Print Network [OSTI]

big, complex issues ­ Montana Healthcare Workforce Advisory Committee, HC Workforce Strategic PlanStrategic Planning Notes MT AHEC/MORH Advisory Board February 7, 2014 Strategic Priorities 1. Healthcare Workforce Training and educating the workforce Montana needs o Educational infrastructure o

Dyer, Bill

93

2014 - 2018 Strategic Plan | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data CenterEnergyAuthorizationSunShot Initiative1 Strategic Plan 20114 - 2018

94

The NABIR Strategic Plan 2001  

SciTech Connect (OSTI)

For more than 50 years, the U.S. created a vast network of more than 113 facilities for research, development, and testing of nuclear materials. As a result of these activities, subsurface contamination has been identified at over 7,000 discrete sites across the U.S. Department of Energy (DOE) complex. With the end of the Cold War threat, the DOE has shifted its emphasis to remediation, decommissioning, and decontamination of the immense volumes of contaminated groundwater, sediments, and structures at its sites. DOE is currently responsible for remediating 1.7 trillion gallons of contaminated groundwater, an amount equal to approximately four times the daily U.S. water consumption, and 40 million cubic meters of contaminated soil, enough to fill approximately 17 professional sports stadiums. It is estimated that more than 60% of DOE facilities have groundwater contaminated with metals or radionuclides. The only contaminant that appears more often than metal and radionuclide contaminants in groundwater is chlorinated hydrocarbons. More than 50% of all soil and sediments at DOE facilities are contaminated with metal and radionuclides, the contaminants found with the highest frequency in soil at all DOE waste sites. Indeed, while virtually all of the contaminants found at industrial sites nationwide can also be found at DOE sites, many of the metals and especially the radionuclides found on DOE sites are unique to those sites. Current technology for treatment of groundwater contaminated with metals and/or radionuclides is ''pump and treat,'' followed by disposal or reinjection of treated water. This process can be costly and inefficient due to the difficulty of completely removing the contaminated groundwater and sorption of contaminants on mineral surfaces. DOE's Office of Environmental Management (EM), which is responsible for the cleanup, has stated that advances in science and technology are critical for DOE to reduce costs and successfully address these long-term problems. DOE's Environmental Quality R&D Portfolio includes environmental restoration and long-term stewardship as its highest priorities. A recent analysis of the portfolio (September 2000) suggested that R&D in these two areas is inadequate. The NABIR program aims (1) to provide the fundamental knowledge to support the development of new bioremediation technologies and (2) to advance the understanding of key processes that control the effectiveness of containment as a means of long term stewardship. NABIR has the distinction of being the only federal program that funds fundamental research on metal and radionuclide contaminants in the environment. The program's greatest strength is in focusing talents and expertise from many disciplines to address challenging research questions. The products from NABIR will influence the development of effective bioremediation technologies as well as contribute new knowledge about the function of subsurface ecological systems at the microbiological and geochemical levels. These advances can lead to more effective stewardship of natural resources as well as to remediation of DOE sites.

Various

2001-10-22T23:59:59.000Z

95

Eastern Band of Cherokee Strategic Energy Plan  

SciTech Connect (OSTI)

The Eastern Band of Cherokee Indians was awarded a grant under the U.S. Department of Energy Tribal Energy Program (TEP) to develop a Tribal Strategic Energy Plan (SEP). The grant, awarded under the First Steps phase of the TEP, supported the development of a SEP that integrates with the Tribes plans for economic development, preservation of natural resources and the environment, and perpetuation of Tribal heritage and culture. The Tribe formed an Energy Committee consisting of members from various departments within the Tribal government. This committee, together with its consultant, the South Carolina Institute for Energy Studies, performed the following activities: Develop the Tribes energy goals and objectives Establish the Tribes current energy usage Identify available renewable energy and energy efficiency options Assess the available options versus the goals and objectives Create an action plan for the selected options

Souther Carolina Institute of energy Studies-Robert Leitner

2009-01-30T23:59:59.000Z

96

Strategic Energy Planning Process | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from the GridwiseSiteDepartment ofCreatingCellStrategic Energy Planning Process

97

Strategic Plan FY14-FY18  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBiSiteNeutron Scattering4American'!StoresStrategicReservePlan

98

EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets  

Broader source: Energy.gov [DOE]

WASHINGTON, D.C. EM is conducting a strategic planning effort that aims to optimize progress in the organizations environmental cleanup program.

99

State Energy Program Strategic Plan for the 21st Century  

Broader source: Energy.gov [DOE]

Representatives of DOE and the States initiated development of this Strategic Plan to clearly define the program's goals for the next 10 years.

100

Government-Wide Diversity and Inclusion Strategic Plan (2011...  

Office of Environmental Management (EM)

diversity and inclusion efforts: workforce diversity, workplace inclusion, and sustainability. The Department of Energy's Diversity and Inclusion Strategic Plan was based off...

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Strategic Roadmap 2024 and Tactical Action Plan  

SciTech Connect (OSTI)

This chart defines the CRITICAL PATHWAYS described in the Strategic Roadmap and the breakdown of the STRATEGIC TARGET AREAS, providing WORK SCOPE ESTIMATES for each heading.

none,

2014-05-14T23:59:59.000Z

102

NANA Strategic Energy Plan & Energy Options Analysis  

SciTech Connect (OSTI)

NANA Strategic Energy Plan summary NRC, as an Alaska Native Corporation, has committed to addressing the energy needs for its shareholders. The project framework calls for implicit involvement of the IRA Councils in the Steering Committee. Tribal Members, from the NRC to individual communities, will be involved in development of the NANA Energy Plan. NRC, as the lead tribal entity, will serve as the project director of the proposed effort. The NRC team has communicated with various governmental and policy stakeholders via meetings and discussions, including Denali Commission, Alaska Energy Authority, and other governmental stakeholders. Work sessions have been initiated with the Alaska Village Electric Cooperative, the NW Arctic Borough, and Kotzebue Electric Association. The NRC Strategic Energy Plan (SEP) Steering committee met monthly through April and May and weekly starting in June 2008 in preparation of the energy summit that was held from July 29-31, 2008. During preparations for the energy summit and afterwards, there was follow through and development of project concepts for consideration. The NANA regional energy summit was held from July 29-31, 2008, and brought together people from all communities of the Northwest Arctic Borough. The effort was planned in conjunction with the Alaska Energy Authoritys state-wide energy planning efforts. Over $80,000 in cash contributions was collected from various donors to assist with travel from communities and to develop the summit project. Available funding resources have been identified and requirements reviewed, including the Denali Commission, U.S. Dept. of Agriculture, and the Alaska Energy Authority. A component of the overall plan will be a discussion of energy funding and financing. There are current project concepts submitted, or are ready for submittal, in the region for the following areas: Wind-diesel in Deering, Buckland, Noorik, and Kiana areas; potential development around Red Dog mine. Biomass Feasibility analysis in the upper Kobuk; Run of the river hydroelectric development for the Upper Kobuk; Solar photovoltaic (PV) power demonstration projects for Noatak, Ambler, Selawik, Kiana, and Noorvik; Heat Recovery for several communities; In September 2008, the NRC team participated at the Alaska Rural Energy Conference in Girdwood, Alaska In November 2008, the NRC team gave a presentation on the NANA regional energy plans at a DOE Tribal Energy Program conference in Denver, Colorado. In January 2009, the final SEP report was submitted to NRC.

Jay Hermanson; Brian Yanity

2008-12-31T23:59:59.000Z

103

Warner College of Natural Resources 2005-2010 Strategic Plan  

E-Print Network [OSTI]

of renewable and non-renewable resources. #12;SOCIETAL GOALS Human dimensions (human understandingWarner College of Natural Resources 2005-2010 Strategic Plan Executive Summary #12;WARNER COLLEGE OF NATURAL RESOURCES 2005-2010 STRATEGIC PLAN Executive Summary Our Vision To be the global leader

104

Civil & Environmental EngineeringStrategic Plan 2014-2018  

E-Print Network [OSTI]

Civil & Environmental EngineeringStrategic Plan 2014-2018 College of Engineering, Architecture & Technology #12;Strategic Plan 2014-2018 Civil and Environmental Engineering at Oklahoma State University started in 1906. Civil and environmental engineers spend their careers dealing with infrastructure

Piao, Daqing

105

Sustainability Strategic Plan 20132016 At Yale, we believe that  

E-Print Network [OSTI]

Sustainability Strategic Plan 2013­2016 At Yale, we believe that sustainability depends us to even more innovation. We have a responsibility to future generations to ensure that sustainable Sustainability Strategic Plan 2013­2016 #12;Letter from President Peter Salovey At Yale, we believe

106

Data-Driven, Strategic Energy Management | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Building Energy Use Benchmarking Benchmarking & Disclosure Policy Data-Driven, Strategic Energy Management Data Access Evaluation, Measurement, & Verification Energy Technologies...

107

Strategic planning for power system restorations  

SciTech Connect (OSTI)

This paper considers the power system restoration planning problem (PSRPP) for disaster recovery, a fundamental problem faced by all populated areas. PSRPPs are complex stochastic optimization problems that combine resource allocation, warehouse location, and vehicle routing considerations. Furthermore, electrical power systems are complex systems whose behavior can only be determined by physics simulations. Moreover, these problems must be solved under tight runtime constraints to be practical in real-world disaster situations. This work is three fold: (1) it formalizes the specification of PSRPPs; (2) introduces a simple optimization-simulation hybridization necessary for solving PSRPPs; and (3) presents a complete restoration algorithm that utilizes the strengths of mixed integer programming, constraint programming, and large neighborhood search. This paper studied a novel problem in the field of humanitarian logistics, the Power System Restoration Problem (PSRPP). The PSRPP models the strategic planning process for post disaster power system recovery. The paper proposed a multi-stage stochastic hybrid optimization algorithm that yields high quality solutions to real-world benchmarks provided by Los Alamos National Laboratory (LANL). The algorithm uses a variety of technologies, including MIP, constraint programming, and large neighborhood search, to exploit the structure of each individual optimization subproblem. The experimental results on hurricane disaster benchmarks indicate that the algorithm is practical from a computational standpoint and produce significant improvements over existing relief delivery procedures.

Bent, Russell W [Los Alamos National Laboratory; Van Hententyck, Pascal [BROWN UNIV.; Coffrin, Carleton [BROWN UNIV.

2010-10-12T23:59:59.000Z

108

Coal Power Systems strategic multi-year program plans  

SciTech Connect (OSTI)

The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

None

2001-02-01T23:59:59.000Z

109

Environmental Management System Plan  

E-Print Network [OSTI]

R-3 Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

110

Priorities for the 21st A Strategic Plan for NOAA's  

E-Print Network [OSTI]

National Environmental Satellite, Data, and Information Service October 2003 #12;Preface We thank all who the National Environmental Satellite, Data, and Information Service (NESDIS) Strategic Plan. This Strategic decisions affecting the environment, economy, and national security. · Improved Data Utilization: Realizing

111

Management and Performance PERFORMANCE REPORTING AND PLANNING  

E-Print Network [OSTI]

AND PLANNING M&P-144 the Agency's workforce is well informed of major Agency initiatives and human capitalManagement and Performance PERFORMANCE REPORTING AND PLANNING M&P-143 Strategic Goal 5: Enable.1: IDENTIFY, CULTIVATE, AND SUSTAIN A DIVERSE WORKFORCE AND INCLUSIVE WORK ENVIRONMENT THAT IS NEEDED

112

15.902 Strategic Management I, Fall 2005  

E-Print Network [OSTI]

Subject focuses on some of the important current issues in strategic management. It concentrates on modern analytical approaches and on enduring successful strategic practices. It is consciously designed with a technological ...

Hax, Arnoldo C.

113

Draft Strategic Laboratory Missions Plan. Volume II  

SciTech Connect (OSTI)

This volume described in detail the Department`s research and technology development activities and their funding at the Department`s laboratories. It includes 166 Mission Activity Profiles, organized by major mission area, with each representing a discrete budget function called a Budget and Reporting (B & R) Code. The activities profiled here encompass the total research and technology development funding of the laboratories from the Department. Each profile includes a description of the activity and shows how the funding for that activity is distributed among the DOE laboratories as well as universities and industry. The profiles also indicate the principal laboratories for each activity, as well as which other laboratories are involved. The information in this volume is at the core of the Strategic Laboratory Mission Plan. It enables a reader to follow funds from the Department`s appropriation to a specific activity description and to specific R & D performing institutions. This information will enable the Department, along with the Laboratory Operations Board and Congress, to review the distribution of R & D performers chosen to execute the Department`s missions.

NONE

1996-03-01T23:59:59.000Z

114

Strategic planning for mixed class grazing in the Edwards Plateau  

E-Print Network [OSTI]

enterprise he should implement to efficiently use resources for maximizing profit. The overall objective of this research is to develop a strategic planning procedure for allocating multispecies grazing in a commercial hunt environment on an economical...STRATEGIC PLANNING FOR MIXED CLASS GRAZING IN THE EDWARDS PLATEAU A Thesis by EDUARDO HOWARD FIELD Submitted to the Office of Graduate Studies of Texas ASM University in partial fulfillment of the requirements for the degree of MASTER...

Field, Eduardo Howard

1988-01-01T23:59:59.000Z

115

Project Management Plan Resident Management System (RMS)  

E-Print Network [OSTI]

1 Project Management Plan Resident Management System (RMS) And Quality Control System (QCS Resident Management System.........................................................................................................3 Project Management Plan - Purpose

US Army Corps of Engineers

116

Waste Management Quality Assurance Plan  

E-Print Network [OSTI]

Revision 6 Waste Management Quality Assurance Plan Waste6 WM QA Plan Waste Management Quality Assurance Plan LBNL/4 Management Quality Assurance

Waste Management Group

2006-01-01T23:59:59.000Z

117

BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN  

E-Print Network [OSTI]

BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A R RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDIN T PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEM

Florida, University of

118

Fusion Energy for Power Production: Status Assessment, Identification of Challenges and Strategic Plan for Commercialization  

E-Print Network [OSTI]

1 Fusion Energy for Power Production: Status Assessment, Identification of Challenges and Strategic in the Technical Assessment Committee (TAC) and 4) EPRI being the Program Manager for the project. Establish Plan for Commercialization March 2011 Phase I. Status Assessment and Identification of Challenges

119

A Strategic Program Plan for Fusion Energy Sciences Fusion Energy Sciences  

E-Print Network [OSTI]

, while creating manageable waste and little risk to public safety and health. Making fusion energy a part light atoms such as those of hydrogen, holds great promise for clean and abundant energy produc- tionA Strategic Program Plan for Fusion Energy Sciences 1 Fusion Energy Sciences #12;2 Bringing

120

Bottling Electricity: Storage as a Strategic Tool for Managing...  

Broader source: Energy.gov (indexed) [DOE]

Bottling Electricity: Storage as a Strategic Tool for Managing Variability and Capacity Concerns in the Modern Grid - EAC Report (December 2008) Bottling Electricity: Storage as a...

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

2012 WVU ALUMNI ASSOCIATION STRATEGIC PLAN Mission Statement  

E-Print Network [OSTI]

management advice and support to the professional staff. Role of the Staff To achieve annual and strategic goals. To ensure adherence to organizational policies and priorities. To develop and effectively manage programming. #12;To responsibly manage the budget. To effectively engage and communicate with WVU graduates

Mohaghegh, Shahab

122

Strategic Planning and Implementation National Renewable Energy Laboratory  

E-Print Network [OSTI]

Strategic Planning and Implementation James Ohi National Renewable Energy Laboratory 1617 Cole Blvd producers, regional and state agencies, research institutes, and federal agencies provided information about scenario planning was presented at the World Hydrogen Energy Conference (WHEC) in June. The scenario

123

East Tennessee State University TBR Strategic Planning 2005-2010  

E-Print Network [OSTI]

East Tennessee State University TBR Strategic Planning 2005-2010 GOAL 1. LEADERSHIP LEADERSHIP Planning Priority. The Tennessee Board of Regents System will provide leadership in promoting educational toward enhancing workforce development, · commitment to civic involvement that builds on a history

Karsai, Istvan

124

Best Management Practice #1: Water Management Planning  

Broader source: Energy.gov [DOE]

A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

125

Final Report for the Soboba Strategic Tribal Energy Planning Project  

SciTech Connect (OSTI)

In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

Miller, Kim [EPA Specialist] [EPA Specialist

2013-09-17T23:59:59.000Z

126

UC Davis Health System Strategic Planning Update  

E-Print Network [OSTI]

under way Threats and uncertainties - Health-care reform - State support - Retirement benefits; UCOP of primary and tertiary/quaternary care that UC Davis Health System will provide in the future. 10. Leverage to and play a leading role in designing health reform. PART A. INTERVIEW CONCLUSIONS - Recommended Strategic

Todd, Brian

127

Strategic Plan for Light Water Reactor Research and Development  

SciTech Connect (OSTI)

The purpose of this strategic plan is to establish a framework that will allow the Department of Energy (DOE) and the nuclear power industry to jointly plan the nuclear energy research and development (R&D) agenda important to achieving the Nation's energy goals. This strategic plan has been developed to focus on only those R&D areas that will benefit from a coordinated government/industry effort. Specifically, this plan focuses on safely sustaining and expanding the electricity output from currently operating nuclear power plants and expanding nuclear capacity through the deployment of new plants. By focusing on R&D that addresses the needs of both current and future nuclear plants, DOE and industry will be able to take advantage of the synergism between these two technology areas, thus improving coordination, enhancing efficiency, and further leveraging public and private sector resources. By working together under the framework of this strategic plan, DOE and the nuclear industry reinforce their joint commitment to the future use of nuclear power and the National Energy Policy's goal of expanding its use in the United States. The undersigned believe that a public-private partnership approach is the most efficient and effective way to develop and transfer new technologies to the marketplace to achieve this goal. This Strategic Plan is intended to be a living document that will be updated annually.

None

2004-02-01T23:59:59.000Z

128

Carbon Management Plan for the Exeter Campuses 2010-2020  

E-Print Network [OSTI]

and Awards 3.4.6 Local Drivers 4 Carbon Management Strategy 4.1 Vision 4.2 University Strategic Plan 4 Energy Manager Carbon Management Plan 2010 - 2020 Contents 1 Forewords 1.1 Foreword from the Vice Drivers 3.4.2 National Drivers - Legislation 3.4.3 National Drivers Government Strategy for Carbon

Bearhop, Stuart

129

Strategic Planning Overview | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy Strain Rate Characterization of Advanced PetroleumStrategic

130

Energy planning and management plan  

SciTech Connect (OSTI)

This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

NONE

1996-01-01T23:59:59.000Z

131

Policy Flash 2014-39 Initiatives to Achieve Strategic Plan 2014...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings Policy Flash 2014-39 Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused...

132

Sandia National Laboratories: News: Publications: Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive SolarEducationStationCSP Resources On September 26,EFRCNews /HPCNewsStrategic

133

Steps to Developing the New Orleans Strategic Energy Plan (Presentation)  

SciTech Connect (OSTI)

This presentation was given by NREL's Elizabeth Doris (Brown) to the New Orleans City Council in January 2008. NREL was funded by DOE to provide technical assistance to New Orleans after Hurricanes Katrina and Rita. The presentation provides an overview of strategic energy planning, case studies, and suggested next steps for implementing energy efficiency and renewable energy into the city's rebuilding efforts.

Brown, E.

2011-01-01T23:59:59.000Z

134

Information Technology Services Strategic Plan 2013-14  

E-Print Network [OSTI]

is Our Vision In the spirit of innovation Bowling Green State University (BGSU) will be a national. The University Mission is Our Mission Bowling Green State University provides educational experiences Information Technology Services Strategic Plan 2013-14 The University Vision

Moore, Paul A.

135

Student Judicial Programs 2010-2011 Strategic Plan  

E-Print Network [OSTI]

Student Judicial Programs 2010-2011 Strategic Plan Updated: August 19, 2010 Mission Promoting Student Success Vision Student Judicial Programs will challenge students to become active participants and educationally adjudicating alleged violations of the Code of Student Conduct. Values As a member of the campus

Rock, Chris

136

Physics and Astronomy Department Strategic Plan March 1, 2011  

E-Print Network [OSTI]

Physics and Astronomy Department Strategic Plan March 1, 2011 Executive Summary The Department of Physics & Astronomy performs world-class research and provides state-of-the-art training for students in astronomy, astrophysics, and gravitational physics; atomic/molecular/optical physics, quantum optics

Harms, Kyle E.

137

EMSL Strategic Plan to Maximize Scientific Impact of  

E-Print Network [OSTI]

alternative energy sources. BER has a long history of determining the biological and environmental impact of Biological and Environmental Research (BER) to foster high-impact science for the benefit of BER's scienceEMSL Strategic Plan to Maximize Scientific Impact of the Quiet Wing PEMP Notable Outcomes Goal 2

138

Technology Strategic Plan 2013 2016 Office of Information Technology  

E-Print Network [OSTI]

Technology Strategic Plan 2013 ­ 2016 Office of Information Technology June 2013 #12;2 T A B L E O F C O N T E N T S: - Introduction - - Executive Summary - - Terminology - - A Vision for Technology at the City College of New York - - The Mission of the Office for Technology (OIT) - - Technology Guiding

Brinkmann, Peter

139

CEHS Technology Committee Strategic Plan March 1, 2012  

E-Print Network [OSTI]

CEHS Technology Committee Strategic Plan 2012-13 March 1, 2012 Thomas Carrell ­ Special Education Gina Causin ­ Nutrition and Health Sciences Mary Sutton ­ Technology Services Jessica Hustad ­ Staff Council Al Steckelberg - CEHS Technology Committee Chair #12;Mission Statement Knowledge

Farritor, Shane

140

Extension Strategic Plan 1 GUIDELINES FOR DECISION-MAKING  

E-Print Network [OSTI]

education with organizational efficiency and accountability. In the changing and competitive global organizational capacity to reach these goals, but that we set the stage for the kind of transformative change and understanding. The Strategic Plan articulates a shared purpose that builds upon existing organizational

Netoff, Theoden

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Best Practices in Developing a Tribal Strategic Energy Plan  

Broader source: Energy.gov [DOE]

This webinar on Jan. 28, 2015 from 11 a.m. to 12:30 p.m. will cover strategic energy plans. Attendees will learn from experts who have overcome typical barriers and used community participation to gain support and ownership.

142

Roadmapping - A Tool for Strategic Planning and Leveraging R&D completed by other Agencies  

SciTech Connect (OSTI)

The Department of Energy (DOE) is responsible for management of the environmental legacy of the nation's nuclear weapons and research program. This is the largest, most complex environmental cleanup program in the world. The issues and problems encountered in this program create the need to develop many scientific and technological solutions. To be effective, the process used to create these solutions must be well coordinated through DOE's Environmental Management program, the rest of DOE, and other Federal agencies. Roadmapping is one strategic planning tool to provide the needed coordination. Past roadmapping accomplishments include: (1) Issuance of the Draft EM Roadmapping Guidance; (2) Issuance of the EM R&D Program Plan and Strategic Plan which established the direction for Roadmapping; (3) Issuance of the OST Management Plan which calls out Roadmapping as a key tool in EM Research & Development (R&D) Strategic Planning; (4) Completion of or progress on key EM Roadmaps, i.e., Savannah River High Level Waste (HLW) Salt Dispositioning Roadmaps, Hanford Groundwater/Vadose Zone Roadmap, Robotics and Intelligent Machines Critical Technology Roadmap, Complex-Wide Vadose Zone Roadmap, Long-Term Stewardship Preliminary Roadmap, Hydrogen Gas Generation R&D Plan (Roadmap), Idaho National Engineering and Environmental Laboratory (INEEL) Sodium Bearing Waste Dispositioning Roadmap, INEEL Voluntary Consent Order Tanks Characterization Roadmap, INEEL Vadose Zone/Groundwater Roadmap, Calcine Treatment Alternatives Roadmap. These efforts represent a great start; however, there is more to be accomplished in using Roadmapping as a tool for planning strategic initiatives and in coordinating the R&D performed by multiple federal agencies.

Collins, J. W.

2002-02-28T23:59:59.000Z

143

Penobscot Indian Nation's Strategic Energy Planning Efficiency on tribal Lands  

SciTech Connect (OSTI)

The energy grant provided the resources to evaluate the wind, hydro, biomass, geothermal and solar resource potential on all Penobscot Indian Naiton's Tribal lands. The two objectives address potential renewable energy resources available on tribal lands and energy efficiency measures to be taken after comprehensive energy audits of commercial facilities. Also, a Long Term Strategic Energy Plan was developed along with a plan to reduce high energy costs.

Sockalexis, Mike; Fields, Brenda

2006-11-30T23:59:59.000Z

144

Strategic Energy and Sustainability Planning in El Paso, Texas  

Broader source: Energy.gov [DOE]

Presentation at the January 27, 2010 TAP Webinar by Alexander Dane and Brian Levite of the DOE National Renewable Energy Laboratory on strategic energy planning and sustainability planning, with a case study from the City of El Pasto, Texas. The Webinar was sponsored by the DOE Technical Assistance Project (TAP) for state and local officials under the auspices of the DOE Office of Energy Efficiency and Renewable Energy.

145

Commonwealth of the Northern Mariana Islands Strategic Energy Plan  

SciTech Connect (OSTI)

Describes various energy strategies available to CNMI to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption. The information presented in this strategic energy plan will be used by the CNMI Governor's Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, and expanding the use of a range of energy technologies, including renewable electricity production and buildings energy efficiency and conservation.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

146

National Center for Combating Terrorism Strategic Plan, September 2003  

SciTech Connect (OSTI)

National Center for Combating Terrorism Strategic Plan is to document the mission, vision, and goals for success; define the build plan; and describe initiatives that support the U.S. Department of Homeland Security, U.S. Department of Defense, U.S. Department of Energy, U.S. Department of Justice, intelligence community, National Governors Association, and other organizations or departments with combating terrorism training, testing, and technology responsibilities.

Bechtel Nevada

2003-09-01T23:59:59.000Z

147

Strategic Planning Concept Paper: ENERGY FREEDOM FIELD by M. Kostic Page 1 of 2 NIU Strategic Planning Concept Paper  

E-Print Network [OSTI]

beyond, with a mission of developing energy vision, renewable and alternative energy resources and renewable sources) and is always changing, NIU now could help in further strategic planning and development and leadership, and thus assist in critical decision making and energy development of our region. YES

Kostic, Milivoje M.

148

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan  

E-Print Network [OSTI]

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Compiled by Wasco County Soil and Water Conservation District in cooperation with Fifteenmile Coordinating Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN

149

Aspen, Colorado: Community Energy Strategic Planning Process  

Broader source: Energy.gov [DOE]

This presentation features Lee Ledesma, utilities operations manager with the City of Aspen, Colorado. Ledesma provides an overview of the City of Aspen's experience in putting together a financing...

150

January 28, 2010 Strategic Planning Session  

E-Print Network [OSTI]

rating (sat./very sat.) constr 85% Manage Budget 6.1.1 Balanced Budget @ End of Year 100% 100% Maximize 6.3.1 Energy Usage by 2015 20% or 99 kBTUs/GSF 120 kBTUs 6.3.2 Water Usage by 2010 20% or 43 Gal HUB Participation 6.5.1 80% Cap Projects achieve 12% HUB 80% 50% Facilities Management FY 2010

Howitt, Ivan

151

20062011 Strategic Plan New Frontiers in  

E-Print Network [OSTI]

contributor to human health and disease. Exposures to many substances, such as pollutants, chemicals by using environmental sci ences to understand human biology and human disease. This new vision://www.niehs.nih.gov/external/plan20062 #12;The NIEHS visionis to prevent disease and improve human health by using environmental sciences

Bandettini, Peter A.

152

Integrated Planning and Performance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

management systems need clarification - Consolidated planning annual timetable needed for efficiency * Organizational rolesresponsibilities need alignment to defined planning...

153

FORMALDEHYDE Formaldehyde Management Plan i  

E-Print Network [OSTI]

and Evaluation) Facilities Management Work Control Center (40)5-2222 (Repair of Facility Equipment DeficienciesFORMALDEHYDE MANAGEMENT PLAN #12;Formaldehyde Management Plan i Review and Approval Authority Formaldehyde Management Plan this page intentionally blank #12;Formaldehyde Management Plan iii Table

Rubloff, Gary W.

154

Dalton Cumbrian Facility Strategic Science Plan  

E-Print Network [OSTI]

decommissioning, radioactive waste cleanup and management, nuclear power plant design and operation, and health to provide world-leading expertise to the nuclear power industry, especially in the areas of decontamination-pronged approach employing lab and rig scale experiments, in conjunction with simulation and modelling

155

Improving Lives. Improving Texas. Agency Strategic Plan  

E-Print Network [OSTI]

. Williams Administration Building 7101 TAMU September 2009 College Station, TX 77843-7101 Phone: 979. In the context of this broad mission, the priorities for Extension education are: Ensure a sustainable and management. Build local capacity for economic development in Texas communities. Improve the health

156

www.nasa.gov Strategic Plan  

E-Print Network [OSTI]

panels retracted into the shadows of its protective solar shield, approaches the Sun in this artist's con, an environment able to support microbial life. (Credit: NASA/JPL­Caltech) Solar Probe Plus, its primary solar- cept. Managed by the Goddard Space Flight Center, Solar Probe Plus will repeatedly sample the near

Waliser, Duane E.

157

2014 National Institutes of Health Clinical Center Strategic and Annual Operating Plan  

E-Print Network [OSTI]

2014 National Institutes of Health Clinical Center Strategic and Annual Operating Plan Local for Clinical Research · Medical Executive Committee · Board of Scientific Counselors · Joint Commission · Other developing the strategic and annual operating plan, informing development of strategic goals and annual

158

2011-2020 Strategic Plan | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste and Materials Disposition#EnergyFaceoff12011-2020 Strategic Plan

159

Strategic Energy Planning Webinar Text Version | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from the GridwiseSiteDepartment ofCreatingCellStrategic Energy Planning

160

Management Plan Supplement Yakima Subbasin Plan  

E-Print Network [OSTI]

#12;Management Plan Supplement Yakima Subbasin Plan November 26, 2004 Prepared for the Presented's subbasin planning process is iterative and designed within an adaptive management framework. Management is comprised of elected officials from local governments throughout the subbasin, and meets regularly to work

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Implementing Strategic Environmental Assessment of spatial planning tools  

SciTech Connect (OSTI)

After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: This is a comparative analysis of SEA in strategic spatial planning in Italy. The adhesion of Provinces to the study is remarkable. SEA implementation and integration into spatial planning is still moderate. Participation via consultations should be more widespread. Monitoring and institution of observatories are still in an infancy stage.

De Montis, Andrea, E-mail: andreadm@uniss.it

2013-07-15T23:59:59.000Z

162

2013 Strategic Sustainability Performance Plan | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataCombinedDepartment ofCareersWindProject Management3 Awards2013 Strategic

163

Automated Home Energy Management (AHEM) Standing Technical Committee...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Home Energy Management (AHEM) Standing Technical Committee Strategic Plan - February 2012 Automated Home Energy Management (AHEM) Standing Technical Committee Strategic Plan -...

164

Tactical Action Plan: Powering the Energy Frontier (An Appendix to the Strategic Roadmap 2024)  

SciTech Connect (OSTI)

The Tactical Action Plan identifies and describes the Western-wide tasks and activities, existing and new, needed to fully achieve the goals in Strategic Roadmap 2024. Each activity in the TAP chart is briefly described in this document and also linked to the Critical Pathway it supports. As the TAP is a list of specific strategies and actions susceptible to changing environments and needs, the TAP will be updated more frequently as Western progresses towards its goals. The TAP is organized into seven Strategic Target Areas that serve as Westerns priorities and areas of focus for the next two to three years. These Target Areas are: Power and Transmission Related Services; Energy Infrastructure; Partnership and Innovation; Asset Management; Safety and Security; Communication; and Human Capital Management and Organization Structure. Target Areas are also used to create the agencys annual performance targets, which measure progress and implementation of the TAP, and the status of which will be reported regularly.

none,

2014-01-01T23:59:59.000Z

165

Strategic Planning, Design and Development of the Shale Gas Supply Chain Network  

E-Print Network [OSTI]

1 Strategic Planning, Design and Development of the Shale Gas Supply Chain Network Diego C. Cafaro1-term planning of the shale gas supply chain is a relevant problem that has not been addressed before Shale gas, supply chain, strategic planning, MINLP, solution algorithm * Corresponding author. Tel.: +1

Grossmann, Ignacio E.

166

Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan  

SciTech Connect (OSTI)

The Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Explosion Monitoring Research and Engineering (NEM R&E) Program is dedicated to providing knowledge, technical expertise, and products to US agencies responsible for monitoring nuclear explosions in all environments and is successful in turning scientific breakthroughs into tools for use by operational monitoring agencies. To effectively address the rapidly evolving state of affairs, the NNSA NEM R&E program is structured around three program elements described within this strategic plan: Integration of New Monitoring Assets, Advanced Event Characterization, and Next-Generation Monitoring Systems. How the Program fits into the National effort and historical accomplishments are also addressed.

Casey, Leslie A. [DOE/NNSA

2004-09-01T23:59:59.000Z

167

Department of Energy Strategic Plan, May 2011 - High Resolution Printing  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergy DOEDealing WithDevelopmentReport and7 MAY 2011 iii STRATEGIC PLAN

168

U.S. Department of Energy Strategic Plan 17  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyTheTwo New Energy AmericanOffice ofThe-2018 DOE Strategic Plan7

169

U.S. Department of Energy Strategic Sustainability Performance Plan  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyTheTwo New Energy AmericanOffice ofThe-2018 DOE Strategic Plan7

170

Transcript of April 3, 2013, TAP webinar titled State Energy Strategic Planning  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) transcript of a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

171

Developing The Organized Village of Kasaan's Strategic Energy Plan  

SciTech Connect (OSTI)

The overall goal of this project is to create a Tribal Energy Action Plan that will serve as the Tribeâ??s blueprint for creating long term energy selfâ?sufficiency. The Plan will be developed with input from a committed group of key stakeholders and landowners in the area, will be based on sound data and research, and will address both â??supplyâ?sideâ? options of the development of sustainable energy sources, as well as â??demand-sideâ? options for reducing energy consumption. The resulting plan will include defined comprehensive energy strategies and built upon a baseline assessment of where the Tribe currently is in terms of alternative and renewable energy activities; a vision of where the Tribe wants to go; and an action plan of how the Tribe will reach its vision including the identification of viable energy options based on the long-term strategic plan of the Tribe.

Hamar Glenn P

2013-02-19T23:59:59.000Z

172

Project Management Plans | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to...

173

Plutonium Vulnerability Management Plan  

SciTech Connect (OSTI)

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

174

1994 U.S. Department of Energy Strategic Plan: Fueling a Competitive Economy  

SciTech Connect (OSTI)

The Department of Energy has a rich heritage of meeting important national goals in the areas of energy, national security, science, and technology. The end of the Cold War, and the election of President Clinton, have given us a new national agenda. Through a comprehensive strategic planning process, we have determined that the Department must now unleash its extraordinary scientific and technical talent and resources on new and more sharply focused goals: fueling a competitive economy, improving the environment through waste management and pollution prevention, and reducing the nuclear danger.

None,

1994-04-01T23:59:59.000Z

175

SSPPS STRATEGIC PLAN Pharmacy Education, Pharmaceutical Sciences Research, Clinical Pharmacy Practice  

E-Print Network [OSTI]

and medical centers, community pharmacy settings, academia, government and the pharmaceutical industry 3SSPPS STRATEGIC PLAN Pharmacy Education, Pharmaceutical Sciences Research, Clinical Pharmacy of Pharmacy and Pharmaceutical Sciences (SSPPS). The plan emanates from the work of three committees and has

Gleeson, Joseph G.

176

Energy Management and Conservation Plan  

E-Print Network [OSTI]

Energy Management and Conservation Plan December 2005 #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan Page 2 of 24 Table of Contents Section One: Executive: Reporting Progress #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan

177

BNL Strategic Plan for Nuclear Physics T. Kirk, Associate Laboratory Director, HENP  

E-Print Network [OSTI]

BNL Strategic Plan for Nuclear Physics T. Kirk, Associate Laboratory Director, HENP January 3, 2005 Abstract: The strategic plan for Nuclear Physics at Brookhaven National Laboratory seeks to align itself of the Laboratory to the advance of nuclear physics. To accomplish these guiding principles, we seek to identify

178

School of Architecture Strategic Plan Outline page 1 School of Architecture  

E-Print Network [OSTI]

School of Architecture Strategic Plan Outline ­ page 1 School of Architecture Montana State University Strategic Planning Document Condensed Outline May 24, 2013 School of Architecture Vision Recognizing that architecture is a basic human need, we strive to play an essential and innovative role

Maxwell, Bruce D.

179

The University of British Columbia | Department of Physical Therapy Strategic Plan 2010 2014 1 DEPARTMENT OF PHYSICAL THERAPY  

E-Print Network [OSTI]

The University of British Columbia | Department of Physical Therapy Strategic Plan 2010 ­ 2014 1 DEPARTMENT OF PHYSICAL THERAPY UNIVERSITY OF BRITISH COLUMBIA STRATEGIC PLAN 20102014 development. 3. Faculty members teaching assignments. #12;The University of British Columbia | Department

Michelson, David G.

180

CAMPUS BLUEPRINT ENROLLMENT MANAGEMENT COUNCIL'S  

E-Print Network [OSTI]

CAMPUS BLUEPRINT ENROLLMENT MANAGEMENT COUNCIL'S STRATEGIC ENROLLMENT MANAGEMENT PLAN 2012'S ENROLLMENT MANAGEMENT COUNCIL'S STRATEGIC ENROLLMENT MANAGEMENT PLAN 2012-2017 Report Outline Building a Big: Student Recruitment Initiatives Sharing Our Story of Quality Improving the Academic Profile and Student

Powers, Robert

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Environmental Management System Plan  

SciTech Connect (OSTI)

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

2009-03-24T23:59:59.000Z

182

University of Glasgow Carbon Management Programme Carbon Management Plan working with  

E-Print Network [OSTI]

carbon vision 11 2.3 Strategic themes 12 Targets and objectives 13 3 Emissions Baseline and Projections. Professor Anton Muscatelli, Principal Foreword from the Carbon Trust Cutting carbon emissions as partUniversity of Glasgow Carbon Management Programme Carbon Management Plan working with Page 1 Carbon

Mottram, Nigel

183

Texas Facilities Commission's Facility Management Strategic Plan  

E-Print Network [OSTI]

Pneumatic compressor and air distribution piping. #0;y Controls tend to drift out of calibration. #0;y Susceptible to leaks. #0;y Compressor is a single point of failure. #0;y Reconfiguration requires hardware and piping. #0;y Can not be remotely... monitored. #0;y Manual intervention required to make adjustments. #0;y No pneumatic compressor or air distribution piping. #0;y Can be remotely monitored, adjusted or (re)configured. #0;y Software calibration. #0;y Controls are distributed, so no single...

Ramirez, J. A.

184

Strategic Facility Management: A White Paper  

Broader source: Energy.gov [DOE]

This white paper provides information on the SFP process, its requirements and benefits, and gives a facility manager the basic tools to launch and successfully complete a SFP for the supported organization.

185

EMSL Strategic Plan to Maximize Scientific Impact of  

E-Print Network [OSTI]

) is a new facility built to support scientific research that will enable cost-effective solutions to the U, and maximize the scientific benefit of that investment, the Performance Evaluation Management Plan (PEMP to maximize the benefit of the investment, and Target Outreach to cultivate new users and ultimately

186

2013 Strategic Planning Initiative Market/Demand Resources Index of Resources  

E-Print Network [OSTI]

Workforce Profile 16. WWAMI Physician Workforce 2005 17. UA Expanding Access to Health Programs (EAHP) Plan 18. State Health Care Workforce Development Planning Grant Planning Alaska's Health Workforce FINAL;2013 Strategic Planning Initiative Market/Demand Resources Title: 2009 Alaska Health Workforce Vacancy Study

Pantaleone, Jim

187

Office of Inspector General Strategic Plan Fiscal Years 2009 through 2013  

SciTech Connect (OSTI)

The Department of Energy (Department) Organization Act created the Department in October 1977. That law brought together for the first time, not only most of the government's energy programs, but also science and technology programs and defense responsibilities that included the design, construction, and testing of nuclear weapons. Over its history, the Department has shifted its emphasis and focus as the energy and security needs of the Nation have changed. Today, the Department stands at the forefront of helping the Nation meet our energy, scientific, environmental, and national security goals. The responsibility of the Office of Inspector General (OIG) is to ensure that the Department is: Fulfilling its program and operational goals effectively; Using its resources efficiently in this pursuit; Operating within the scope of its legislative mandates; Meeting the President's Management Agenda; and, Addressing Departmental priorities established by the Secretary. The OIG accomplishes this by performing audits, investigations, and inspections of the Department's programs and operations seeking to uncover existing or potential weaknesses that could result in fraud, waste, and abuse. This strategic plan reflects the vision for how the organization will move forward in the 21st century to ensure the Department continues to serve the American public safely, effectively, and efficiently. Through its strategic planning efforts, the OIG will continue to play a critical role in assisting the Department's leadership and the Congress by identifying opportunities for improving management, program performance, and accountability. The OIG's strategic goal is to perform a robust review program that provides timely, relevant performance information and recommendations to improve the performance of the Department's programs and operations, facilitate positive change, and combat unlawful activities within the Department.

None

2008-10-01T23:59:59.000Z

188

15.928 Strategic Management and Consulting Proseminar: Theoretical Foundations, Spring 2003  

E-Print Network [OSTI]

Provides students with strategic frameworks and a broad exposure to business matters that affect strategic management and the consulting industry. To fulfill that objective, the Proseminar invites distinguished executives ...

Schulmeyer, Gerhard Hans

189

UC Santa Cruz Information Technology Strategic Plan 2014 The primary mission of ITS is to provide high quality infrastructure, support, and innovation in the delivery of information  

E-Print Network [OSTI]

of resources resulted in an organization more well-situated to manage infrastructure, systems, and services high quality infrastructure, support, and innovation in the delivery of information technology products and directives for the organization and management of information technology at UCSC. This ITS Strategic Plan

California at Santa Cruz, University of

190

Massachusetts Ocean Management Plan (Massachusetts)  

Broader source: Energy.gov [DOE]

The Massachusetts Ocean Act of 2008 required the states Secretary of Energy and Environmental Affairs to develop a comprehensive ocean management plan for the state by the end of 2009. That plan...

191

Project Management Plan  

SciTech Connect (OSTI)

The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

Not Available

1988-01-01T23:59:59.000Z

192

Stock Take Summary 2009 A Review of Progress Against the Manchester 2015 Strategic Plan  

E-Print Network [OSTI]

Stock Take Summary 2009 A Review of Progress Against the Manchester 2015 Strategic Plan #12;The 2009 Stock Take Report provides a detailed appraisal of progress against the nine Strategic Goals of the University's performance over the previous 12 months. In relation to accountability, each Stock Take Report

Heil, Matthias

193

National Institutes of Health Clinical Center Strategic  

E-Print Network [OSTI]

National Institutes of Health Clinical Center Strategic and Annual Operating Plan Warren G · Medical Executive Committee · Board of Scientific Counselors · Joint Commission · Other Accreditation the strategic and annual operating plan, informing development of strategic goals and annual targets. Managing

194

Project Management Plan Solution Stabilization  

SciTech Connect (OSTI)

This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

SATO, P.K.

1999-08-31T23:59:59.000Z

195

UNC Charlotte Government Property Management Plan 1 Government Property Management Plan  

E-Print Network [OSTI]

. MANAGEMENT AND ACQUISITION Under the University's property management system, the Materials ManagementUNC Charlotte Government Property Management Plan 1 Government Property Management Plan Initially approved: 21 October 2011 Updated: August 24, 2012 SCOPE This Government Property Management Plan applies

Howitt, Ivan

196

Strategic Plan -Performance Agreements for Utrecht University -page 2 Utrecht University, 2012  

E-Print Network [OSTI]

#12;Strategic Plan - Performance Agreements for Utrecht University - page 2 © Utrecht University, 2012 Structure of this document 1. Introduction 2. Performance agreements for Utrecht University 3. Utrecht University's position in a changing environment 4. Utrecht University's mission, core values

Utrecht, Universiteit

197

Strategic Planning -College -Agricultural Sciences & Natural Resources Unit Assessment Report -Four Column  

E-Print Network [OSTI]

Strategic Planning - College - Agricultural Sciences & Natural Resources Unit Assessment Report - Four Column Texas Tech University Priorities Means of Assessment & Criteria / Tasks Results Action & Natural Resources - 2013 Priority 1_Increase Enrollment and Promote Student Success (CASNR - Outcome 1

Zhang, Yuanlin

198

Environmental Management System Plan  

E-Print Network [OSTI]

Management Program, R-3 Environmental Management SystemEnvironmental policy 3. Environmental aspects 4. Legal andObjectives, targets, and Environmental Management Programs

Fox, Robert

2009-01-01T23:59:59.000Z

199

Waste Management Program management plan. Revision 1  

SciTech Connect (OSTI)

As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

NONE

1997-02-01T23:59:59.000Z

200

Strategic Plan for Patient Care and Prevention Facilities Design & Construction; Engineering Strategic Business Unit  

E-Print Network [OSTI]

The UTMDACC (University of Texas MD Anderson Cancer Center) will realize net savings of $1.6 million in five years by utilizing the PCPF-E SBU (Patient Care and Prevention Facilities Design & Construction; Engineering Strategic Business Unit...

Wangia, Peter Odongo

2009-07-31T23:59:59.000Z

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

The MSc Strategic Project Management prepares graduates to be future leaders in project-based  

E-Print Network [OSTI]

About The MSc Strategic Project Management prepares graduates to be future leaders in project employment prior to graduation. Programme Structure The MSc Strategic Project Management has a single intake-based environments by developing knowledge and skills in both business strategy and project management

Painter, Kevin

202

Application of multi-criteria decision-making on strategic municipal solid waste management in Dalmatia, Croatia  

SciTech Connect (OSTI)

The efficiency of providing a waste management system in the coastal part of Croatia consisting of four Dalmatian counties has been modelled. Two multi-criteria decision-making (MCDM) methods, PROMETHEE and GAIA, were applied to assist with the systematic analysis and evaluation of the alternatives. The analysis covered two levels; first, the potential number of waste management centres resulting from possible inter-county cooperation; and second, the relative merits of siting of waste management centres in the coastal or hinterland zone was evaluated. The problem was analysed according to several criteria; and ecological, economic, social and functional criteria sets were identified as relevant to the decision-making process. The PROMETHEE and GAIA methods were shown to be efficient tools for analysing the problem considered. Such an approach provided new insights to waste management planning at the strategic level, and gave a reason for rethinking some of the existing strategic waste management documents in Croatia.

Vego, Goran [Civil Engineering Institute of Croatia, Environmental and Hydrotechnics Department, Matice Hrvatske 15, 21000 Split (Croatia)], E-mail: goran.vego@igh.hr; Kucar-Dragicevic, Savka [Croatian Environmental Agency, Director's Office, Trg Marsala Tita 8, 10000 Zagreb (Croatia)], E-mail: savka.kucar-dragicevic@azo.hr; Koprivanac, Natalija [Faculty of Chemical Engineering and Technology, Environmental Engineering Department, Marulicev Trg 19, 10000 Zagreb (Croatia)], E-mail: nkopri@fkit.hr

2008-11-15T23:59:59.000Z

203

Data-Driven, Strategic Energy Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA, GA - U.S. DepartmenttoJune 16,AprilFrank G.Strategic energy management

204

Strategic, Tactical and RealTime Planning of Locomotives at Norfolk Southern Using Approximate Dynamic Programming  

E-Print Network [OSTI]

Ayari belgacem@princeton.edu Department of Operations Research and Financial Engineering Sherrerd Hall, but with very few success stories. There are a host of complex rules governing how locomotives should be used with a strategic planning system. #12; Page 1 1 Locomotive planning is one of the most complex

Powell, Warren B.

205

U.S. Energy Infrastructure Investment: Long-Term Strategic Planning  

E-Print Network [OSTI]

be done by putting a ruler on logarithmic graph paper and extending a line from past usage to predict fu- ture usage. Contributors to this paper posit that existing energy planning tools, modelsU.S. Energy Infrastructure Investment: Long-Term Strategic Planning to Inform Policy Development

206

Multiscale Strategic Planning Model for the Design of Integrated Ethanol and Gasoline Supply Chain  

E-Print Network [OSTI]

1 Multiscale Strategic Planning Model for the Design of Integrated Ethanol and Gasoline Supply address the design and planning of an integrated ethanol and gasoline supply chain. We assume, distribution centers where blending takes place, and the retail gas stations where different blends of gasoline

Grossmann, Ignacio E.

207

Industrial Strategic Planning - A New Approach to Developing Energy Efficient Programs  

E-Print Network [OSTI]

Today's energy environment is a precarious one. Industry is well aware of the situation. Some have developed plans to cope with it, others are taking a 'wait and see' posture. To help in decision making, strategic planning has begun to emerge...

Delgado, R. M.; Mitchell, G. M.

1983-01-01T23:59:59.000Z

208

Material Stabilization Project Management Plan  

SciTech Connect (OSTI)

This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

SPEER, D.R.

1999-09-01T23:59:59.000Z

209

Environmental Management System Plan  

E-Print Network [OSTI]

management Water conservation LBNLs approach to sustainable environmentalWater Discharges) of Introduction Environmental Managementenvironmental compliance programs, such as air and water quality, as well as less traditional programs, such as wildland fire management,

Fox, Robert

2009-01-01T23:59:59.000Z

210

Planning and Managing Pesticide Stores  

E-Print Network [OSTI]

1 Planning and Managing Pesticide Stores 231 Corstorphine Road Edinburgh EH12 7AT www not provide a specific training course on pesticide stores, basic store criteria and management are described. The forest industry must be able to demonstrate to regulators such as the Health and Safety Executive (HSE

211

Groundwater protection management program plan  

SciTech Connect (OSTI)

US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ``Groundwater Protection Management Program Plan`` (groundwater protection plan) of sufficient scope and detail to reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

Not Available

1992-06-01T23:59:59.000Z

212

INL-Site Idaho Completion Project Long Term Stewardship Strategic Plan  

SciTech Connect (OSTI)

This Strategic Plan provides a brief historical overview of ICP long-term stewardship at the INL Site and the major goals and strategies that will drive the continued implementation of long-term stewardship in the future. The specific activities and processes that will be required to implement these goals should be outlined within an implementation plan and within implementing procedures and work plans.

Olaveson, B.

2007-09-17T23:59:59.000Z

213

Community Greening: How To Develop A Strategic Energy Plan, Energy Efficiency & Renewable Energy (EERE) (Brochure)  

SciTech Connect (OSTI)

This guide provides an overview of strategic electricity planning for communities, using a step-by-step approach to develop the plan. This method has a high chance of success, because it is based on stakeholder buy-in and political commitment. Not all communities will need to follow all steps, but the process is designed to incorporate all parties, maximize solution-based thinking, and develop a plan that can be carried out by community leaders.

Not Available

2010-02-01T23:59:59.000Z

214

Community Greening: How To Develop A Strategic Energy Plan, Energy Efficiency & Renewable Energy (EERE) (Brochure)  

Office of Energy Efficiency and Renewable Energy (EERE)

This guide provides an overview of strategic electricity planning for communities, using a step-by-step approach to develop the plan. This method has a high chance of success, because it is based on stakeholder buy-in and political commitment. Not all communities will need to follow all steps, but the process is designed to incorporate all parties, maximize solution-based thinking, and develop a plan that can be carried out by community leaders.

215

Underground storage tank management plan  

SciTech Connect (OSTI)

The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

NONE

1994-09-01T23:59:59.000Z

216

Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999  

SciTech Connect (OSTI)

DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

Not Available

1993-12-01T23:59:59.000Z

217

Environmental Management System Plan  

E-Print Network [OSTI]

Water Discharges) of Introduction Environmental Managementmanagement Water conservation LBNLs approach to sustainable environmentalEnvironmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: Protect the air, water,

Fox, Robert

2009-01-01T23:59:59.000Z

218

The Waste Management Quality Assurance Implementing Management Plan (QAIMP)  

E-Print Network [OSTI]

DIVISION Waste Management Quality Assurance ImplementingI I IMPLEMENTING MANAGEMENT QUALITY PLAN ASSURANCE I lilillI WM-QAIMP Waste Management Quality Assurance Implementing

Albert editor, R.

2009-01-01T23:59:59.000Z

219

Solid Waste Management Program Plan  

SciTech Connect (OSTI)

The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

Duncan, D.R.

1990-08-01T23:59:59.000Z

220

An application of agribusiness strategic planning under risk  

E-Print Network [OSTI]

Agriculture entered a new era with the passage of the 1996 FAIR Act. This new era will likely be associated with increasing risk factors that agribusiness managers must consider in developing appropriate management strategies. Managers who can...

Laughlin, Charles Tudor

1999-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Karuk Tribe Strategic Energy Plan and Energy Options Analysis  

SciTech Connect (OSTI)

Energy planning document to assist the Karuk Tribe in making educated decisions about future energy priorities and implementation.

Ramona Taylor, Karuk Tribe; David Carter, Winzler and Kelly

2009-03-31T23:59:59.000Z

222

Electric Utility Strategic Planning at the PUCT: An Overview  

E-Print Network [OSTI]

. This paper provides a broad 'overview of electric utility atrategic planning activities at the PUCT, concentrating on each project's objec tives, methodology, and relationship to other projects. The role of planning activities at a regulatory agency... will be discussed. It is argued that planning projects at a regulatory agency can provide an invaluable validity check on a utility's planning programs, as well as a source of guidance, objective information, and new ideas. However, a regulatory agency...

Zarnikau, J.

223

California Long Term Energy Efficiency Strategic Plan (CPUC, 2008) The Long Term Energy Efficiency Strategic Plan (Plan) was developed through a collaborative process  

E-Print Network [OSTI]

" to program approach, offering comprehensive packages including audits, demand side management and tools is to create demand for more efficient homes and commercial buildings through increasing awareness chapters in the Plan address existing residential and nonresidential buildings. The objective is to reach

224

1.259J / 11.542J / ESD.227J Transit Management, Spring 2003  

E-Print Network [OSTI]

Management methods of relevance to public transportation systems. Topics: strategic planning management; labor relations; maintenance planning and administration; financing; marketing and fare policy; and management ...

Wilson, Nigel H. M.

225

1.259J / 11.542J / ESD.227J Transit Management, Spring 2005  

E-Print Network [OSTI]

Management methods of relevance to public transportation systems. Topics: strategic planning management; labor relations; maintenance planning and administration; financing; marketing and fare policy; and management ...

Wilson, Nigel H. M.

226

Tribal Renewable Energy Foundational Course: Strategic Energy Planning |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7Department of Energy Strategic Energy

227

DOE Announces Webinars on Strategic Energy Planning, the Successful  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTS AVAILABLEReportEnergyDeveloping a Tribal Strategic Energy

228

State Energy Program Strategic Plan: February 2007 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: AlternativeEnvironment,Institutes and1 Special Report: OAS-RA-14-01Awards |StateStateStrategic

229

Demil planning and management system  

SciTech Connect (OSTI)

The National Maintenance Point (NMP) Branch of the US Army Industrial Operations Command (IOC) serves as the Single Manager for Conventional Ammunition (SMCA) agent for managing the renovation, modification, recycling, and disposal of conventional ammunition, thereby improving readiness. The mission of the NMP includes program management for demilitarization (demil) activities, ammunition maintenance, and ammunition peculiar equipment (APE) projects. Through an Interagency Agreement between the US Army and the US Department of Energy, Argonne National Laboratory (ANL) is developing an integrated data management system, called the Demil Planning and Management System (DPMS), for IOC. DPMS is intended to help NMP efficiently manage information on ongoing demil project activities and asset inventories, plan future projects, and allocate budgets. This system, when fully implemented, will also make it possible for the user community to interactively access the DPMS database; perform data entry and queries; and run reports through network, modem, and Internet access to the system. This paper describes the principal components of the DPMS, current capabilities, and planned enhancements.

Huber, C.C.; Bormet, S.M.; Whitfield, R.G.; Bowen, M.; Chun, K.C. [Argonne National Lab., IL (United States); Golden, R.E. [Army Pacific, Fort Shafter, HI (United States); Fuller, R. [Army Industrial Operations Command, Rock Island, IL (United States). National Maintenance Point Branch

1997-08-01T23:59:59.000Z

230

Dynamic Chess: Strategic Planning for Robot Motion Tobias Kunz, Peter Kingston, Mike Stilman and Magnus Egerstedt  

E-Print Network [OSTI]

robot sword defense. Our approach enables a simulated 7-DOF robot arm to block known attacks in any, we concentrate on the following task: A robot arm, equipped with a sword must defend from a seriesDynamic Chess: Strategic Planning for Robot Motion Tobias Kunz, Peter Kingston, Mike Stilman

Egerstedt, Magnus

231

As part of the university-wide strategic planning process, Case School of Engineering  

E-Print Network [OSTI]

As part of the university-wide strategic planning process, Case School of Engineering is focusing to alumni (see opposite page). Our stories will showcase "energy, technology and health, advanced materials for Layered Polymeric Systems (CLiPS), the Center for Cardiovascular Biomaterials, the Case Advanced Power

Rollins, Andrew M.

232

Applying Strategic Multiagent Planning to Real-World Travel Sharing Problems  

E-Print Network [OSTI]

reduce cost (e.g., through group tickets), carbon footprint (e.g., when sharing a private car, or through services for car1 , bike, and walk sharing as well as services which as- sist users in negotiating sharedApplying Strategic Multiagent Planning to Real-World Travel Sharing Problems Jan Hrncír Agent

Rovatsos, Michael

233

Chemical Engineering Strategic Plan: Draft 7/5/02 16 A. Biomolecular Engineering  

E-Print Network [OSTI]

Chemical Engineering Strategic Plan: Draft 7/5/02 16 Appendices A. Biomolecular Engineering Rationale for a Biomolecular Engineer (Comments from M. J. McCready, 11/25/01) While BS chemical engineers have long found employment in a diversity of industrial sectors, chemical and petroleum have been

McCready, Mark J.

234

U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20042009  

E-Print Network [OSTI]

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2004­2009 (Revised March 2004) Statement of the Board The Nuclear Waste Policy Amendments Act of 1987 directed the U-level radioactive waste. The Act also established the U.S. Nuclear Waste Technical Review Board as an indepen dent

235

Nuclear Waste Technical Review Board Strategic Plan for FY 2001-2006  

E-Print Network [OSTI]

Appendix G Nuclear Waste Technical Review Board Strategic Plan for FY 2001-2006 (Revised March 2001) Statement of the Chairman The U.S. Nuclear Waste Technical Review Board was established as an independent agency of the United States Government on December 22, 1987, in the Nuclear Waste Policy Amendments Act

236

U.S. Nuclear Waste Technical Review Board Fiscal Year 2002-2007 Strategic Plan  

E-Print Network [OSTI]

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Fiscal Year 2002-2007 Strategic Plan Statement of the Chairman The U.S. Nuclear Waste Technical Review Board was established of Energy Mission The Board's mission, established in the Nuclear Waste Policy Amendments Act (NWPAA

237

U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20042009  

E-Print Network [OSTI]

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2004­2009 (Revised March 2004) Statement of the Board The Nuclear Waste Policy Amendments Act of 1987 directed the U-level radioactive waste. The Act also established the U.S. Nuclear Waste Technical Review Board as an independent

238

U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20032008  

E-Print Network [OSTI]

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2003­2008 Statement of the Chairman The Nuclear Waste Policy Amendments Act of 1987 directed the U.S. Department as the location of a permanent repository for dis posing of spent nuclear fuel and high-level radioactive waste

239

Department of Residential Life 2013/2014 Strategic Plan & Assessment Initiatives  

E-Print Network [OSTI]

Department of Residential Life 2013/2014 Strategic Plan & Assessment Initiatives MISSION The mission of the Department of Residential Life is to create educational environments emphasizing learning. VISION The Department of Residential Life seeks to promote a vibrant and collaborative living

Missouri-Rolla, University of

240

Strategic Planning and Policy Unit Nuffield Council on Bioethics Consultation on Forensic use of bioinformation: ethical  

E-Print Network [OSTI]

Strategic Planning and Policy Unit Nuffield Council on Bioethics Consultation on Forensic use of forensic bioinformation. 2. The Wellcome Trust is the largest charity in the UK and the second largest. Given the Trust's interests, this brief response will focus on the science underlying the forensic use

Rambaut, Andrew

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

NNSA Releases Annual Stockpile Stewardship & Management Plan...  

National Nuclear Security Administration (NNSA)

Plan NNSA Releases Annual Stockpile Stewardship & Management Plan Press Release Mar 19, 2015 Annual Report Provides Insight into Vital National Security Programs WASHINGTON, DC -...

242

Mercury Strategic Plan Outfall 200 Mercury Treatment Facility  

Office of Environmental Management (EM)

Partial LMR * Alpha-5 LMR & Bldg Characterization * S&M mercury removal * Hg waterfishsediment studies * Technology Development Plan * Debris treatability study * Fate and...

243

A reservoir management plan  

SciTech Connect (OSTI)

There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

Allis, R.G.

1989-06-16T23:59:59.000Z

244

Energy Emergency Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish the administrative and operational framework of the Energy Emergency Management System (EEMS), and to establish the general criteria for the development and coordination of the Department's energy emergency planning activities. Cancels DOE 5500.8. Canceled by DOE O 151.1 of 9-25-95.

1992-07-08T23:59:59.000Z

245

2011 U.S. Department of Energy Strategic Plan  

SciTech Connect (OSTI)

The mission of the Department of Energy is to ensure America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. Goal 1 is to catalyze the timely, material, and efficient transformation of the nation's energy system and secure U.S. leadership in clean energy technologies. Goal 2 is to maintain a vibrant U.S. effort in science and engineering as a cornerstone of our economic prosperity with clear leadership in strategic areas. Goal 3 is to enhance nuclear security through defense, nonproliferation, and environmental efforts. Goal 4 is to establish an operational and adaptable framework that combines the best wisdom of all Department stakeholders to maximize mission success.

None

2011-05-01T23:59:59.000Z

246

Transcript of See Action and Technical Assistance Program Webinar: Strategic Energy Management  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) See Action Network and Weatherization and Intergovernmental Program Technical Assistance Program sponsored this webinar about strategic management in the public sector on November 7, 2012.

247

Institutional Design for Strategic Environmental Assessment on Urban Economic and Social Development Planning in China  

SciTech Connect (OSTI)

The National Economic and Social Development Plans (NESDPs) of cities in China, given their comprehensive, integrated and strategic nature, have significant and profound impacts on the development of cities and their embedded ecological environments. Strategic Environmental Assessments (SEAs) on city NESDPs have the potential to improve environmental policy integration at strategic level and to safeguard the sustainable development of cities. However, these plans are normally exempted from the current SEA requirement in China. We argue that it is more feasible to apply SEAs on city NESDPs before SEAs are expanded to higher level NESDPs in China. This article attempts to propose a China-specific institutional design for SEAs on city NESDPs based on experiments in selected cities and within the current legal framework. To obtain a holistic view about the long-term development of cities, more qualitative and descriptive analysis-based assessment methods should be adopted to broaden participation, to encourage the exchange of information and to reach consensus. - Highlights: > National Economic and Social Development Plans for Cities (NESDPs) in China is a very popular and significant decision made by municipal government. > We propose a institutional framework to conduct strategic environmental assessment to NESDPs. > The key features of the institutional framework are the independent SEA approval committee and a professional consulting agency.

Song Guojun, E-mail: Songguojun@vip.sohu.com; Zhou Li; Zhang Lei

2011-11-15T23:59:59.000Z

248

Performance Demonstration Program Management Plan  

SciTech Connect (OSTI)

To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organizations quality assurance (QA) program and procedures or as otherwise directed by CBFO.

Carlsbad Field Office

2005-07-01T23:59:59.000Z

249

U.S. Department of Energy Strategic Plan 3  

Energy Savers [EERE]

to the missions, strategies, and goals, while providing for continuous improvement in efficiency and effectiveness. Within the Department, senior managers of the individual...

250

Configuration Management Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

& Publications SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Software Configuration Management Checklist NMMSS Software Quality Assurance Plan Software Configuration...

251

Optimization Online - Operations Risk Management by Planning ...  

E-Print Network [OSTI]

Aug 1, 2007 ... Operations Risk Management by Planning Optimally the Qualified Workforce Capacity. Emmanuel Fragni re(Emmanuel.Fragniere ***at***...

Emmanuel Fragni re

2007-08-01T23:59:59.000Z

252

EEO Management Plan 20072010 September 2007 1  

E-Print Network [OSTI]

EEO Management Plan 2007­2010 September 2007 1 EEO Management Plan 2007-2010 Part 9A of the Anti-Discrimination Act (1977) and the Equal Opportunity for Women in the Workplace Act 1999, the EEO Management Plan awarded annually by EOWA) CDPS Cultural Diversity Priorities Statement HRS Human Resource Services ODU

Dunstan, Neil

253

Solid Waste Management Plan. Revision 4  

SciTech Connect (OSTI)

The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

NONE

1995-04-26T23:59:59.000Z

254

OFFICE OF FACILITIES ENGINEERING AND OPERATIONS Strategic and  

E-Print Network [OSTI]

Engineering Museum Support Services Bruce Kendall Director Sheryl Kolasinski DD/CoS Facilities Master Planning Management Engineering &Design Management Technical Services Fire Protection Occupational Safety OccupationalOFFICE OF FACILITIES ENGINEERING AND OPERATIONS Strategic and Administrative Management Julie

Mathis, Wayne N.

255

Waste Management Quality Assurance Plan  

SciTech Connect (OSTI)

The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs.

Waste Management Group

2006-08-14T23:59:59.000Z

256

A Long-Term Strategic Plan for Hanford Sediment Physical Property and Vadose Zone Hydraulic Parameter Databases  

SciTech Connect (OSTI)

Physical property data and unsaturated hydraulic parameters are critical input for analytic and numerical models used to predict transport and fate of contaminants in variably saturated porous media and to assess and execute remediation alternatives. The Remediation Decision Support (RDS) project, managed by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE) and the CH2M Hill Plateau Remediation Company (CHPRC), has been compiling physical and hydraulic property data and parameters to support risk analyses and waste management decisions at Hanford. Efforts have been initiated to transfer sediment physical property data and vadose zone hydraulic parameters to CHPRC for inclusion in HEIS-Geo, a new instance of the Hanford Environmental Information System database that is being developed for borehole geologic data. This report describes these efforts and a strategic plan for continued updating and improvement of these datasets.

Rockhold, Mark L.; Last, George V.; Middleton, Lisa A.

2009-09-30T23:59:59.000Z

257

Strategic plan for oil shale siting reresearch. Proceedings of a planning exercise, November 4-5, 1985, Denver, Colorado  

SciTech Connect (OSTI)

A strategic planning exercise on environmental research and policy to guide oil shale development was held in November 1985. Seventeen participants representing a cross section of interests and technical disciplines identified, from almost 200 suggested issues, 13 strategic issues in four general categories: policy, source characterization and pollutant generation, transport and impact, and risk assessment. The group reached a consensus on the technical objective for each issue and recommendations to address the objective. Each participant has at least several years' experience in some phase of oil shale endeavor. Therefore, a consensus from this group can be a valuable guide for agencies seeking to develop the oil shale resource while also protecting the environment and public health. This document is an attempt to concisely state the issues discussed by the group and thereby serve as a planning guide for oil shale environmental research.

Hinman, G.; Barr, S.; Peterson, E.J.; Williams, M.D. (eds.)

1986-07-01T23:59:59.000Z

258

University of Aberdeen Carbon Management Plan  

E-Print Network [OSTI]

of Aberdeen is committed to reducing its carbon footprint and to playing its part in limiting the worstUniversity of Aberdeen Carbon Management Plan Higher Education Carbon Management Programme working with Page 1 The University of Aberdeen Carbon Management Programme Carbon Management Plan (CMP

Levi, Ran

259

ICDF Complex Operations Waste Management Plan  

SciTech Connect (OSTI)

This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

W.M. Heileson

2006-12-01T23:59:59.000Z

260

Materials Sciences Division Integrated Safety Management Plan  

E-Print Network [OSTI]

Materials Sciences Division Integrated Safety Management Plan Revised: February 9, 2012 Prepared by: signed Feb. 9, 2012 Rick Kelly, Facility/EH&S Manager Submitted by: signed Feb. 9, 2012 Miquel Salmeron.1 RESPONSIBILITY AND AUTHORITY THROUGH LINE MANAGEMENT............................................................5

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Strategic Plan 20092013 Oregon State University 1 Oregon State University  

E-Print Network [OSTI]

and safety, renewable energy production, and economically viable natural resource management for the people of Oregon, the nation and the world. This mission is achieved by producing graduates competitive of Sustainable Earth Ecosystems; Improving Human Health and Wellness; and Promoting Economic Growth and Social

Escher, Christine

262

DOE Releases Climate Change Technology Program Strategic Plan | Department  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA, GA - U.S. Department of Energy Secretary Steven Chuof Energy Plan

263

Microsoft Word - HABAdv#239StrategicPlanning.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fundProject8 -3 Subject: Tank Waste System Plan Rev 42034589

264

EHSS Strategic Plan 2015 - 2018 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResources DOE ZeroThreeEnergy DrivingD EERE Program ManagementEERE4ofEHSS

265

Oak Ridge National Laboratory Waste Management Plan  

SciTech Connect (OSTI)

The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

Not Available

1992-12-01T23:59:59.000Z

266

Oak Ridge Reservation Waste Management Plan  

SciTech Connect (OSTI)

This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

Turner, J.W. [ed.

1995-02-01T23:59:59.000Z

267

OFFICE OF RESOURCE PLANNING OPERATING BUDGET UNIT  

E-Print Network [OSTI]

OFFICE OF RESOURCE PLANNING Manager Sarah Teo OPERATING BUDGET UNIT Deputy Director (Operating, Strategic Initiatives & Consolidated Budgets) Tay Sok Kian Senior Director Ajith Prasad Senior Associate Initiatives & Research Budgets: (Planning & Budget Management) Revenue Policies & Planning: (Grants

Leng, Chenlei

268

E-Print Network 3.0 - annual performance plan Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Name: Management Major: BS BBA BA MANAGEMENT, ENTREPRENEURIAL... of strategic management, workforce planning and employment, human resource development, compensation Source: Boise...

269

Jicarilla Apache Utility Authority Renewable Energy and Energy Efficiency Strategic Planning  

SciTech Connect (OSTI)

The purpose of this Strategic Plan Report is to provide an introduction and in-depth analysis of the issues and opportunities, resources, and technologies of energy efficiency and renewable energy that have potential beneficial application for the people of the Jicarilla Apache Nation and surrounding communities. The Report seeks to draw on the best available information that existed at the time of writing, and where necessary, draws on new research to assess this potential. This study provides a strategic assessment of opportunities for maximizing the potential for electrical energy efficiency and renewable energy development by the Jicarilla Apache Nation. The report analyzes electricity use on the Jicarilla Apache Reservation in buildings. The report also assesses particular resources and technologies in detail, including energy efficiency, solar, wind, geothermal, biomass, and small hydropower. The closing sections set out the elements of a multi-year, multi-phase strategy for development of resources to the maximum benefit of the Nation.

Rabago, K.R.

2008-06-28T23:59:59.000Z

270

Storm Water Management Plan Program (Nebraska)  

Broader source: Energy.gov [DOE]

This legislation implements the National Pollutant Discharge Elimination System Requirements, and encourages cities and counties to create stormwater management plans in order to receive grant...

271

Disruption Management | Operations Research between planning ...  

E-Print Network [OSTI]

record: it can deliver high quality solutions for planning problems. Impor- ..... Disruption management systems face a number of challenges, some of which have.

272

Evolution and Evaluation of the Active Management Area Management Plans  

E-Print Network [OSTI]

on Management Plan Information 29 Municipal 29 Agricultural 30 Industrial 31 Water Budgets 32 Other Summary 46 Appendix C: Tucson AMA 2006 Water Budget 48 Appendix D: Groundwater Management Plan Legislative of the Arizona Groundwater Management Act (GMA), the Arizona Department of Water Resources (ADWR

Fay, Noah

273

Prepared by Dr. Ping Yu To inform strategic information technology planning and workforce education, UnitingCare Ageing  

E-Print Network [OSTI]

Prepared by Dr. Ping Yu To inform strategic information technology planning and workforce education documentation practice. that the workforce is receptive to the opportunities and benefits of a computer utilise computer-based care plans to a certain extent. · The time-consuming nature of a paper-based record

Yu, Ping

274

Strategic Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BAL-002-WECC-2 Operating Reserves May 6, 2014 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2 Presentation Objectives Provide customers with information regarding...

275

STRATEGIC PLAN  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September2-SCORECARD-01-24-13 Page 1 of 1     1.

276

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearchScheduled System Burst Buffer Archive Home » R

277

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout » Staff125,849| OSTI, US Dept of

278

SNL/CA Cultural Resources Management Plan.  

SciTech Connect (OSTI)

The SNL/CA Cultural Resources Management Plan satisfies the site's Environmental Management System requirement to promote long-term stewardship of cultural resources. The plan summarizes the cultural and historical setting of the site, identifies existing procedures and processes that support protection and preservation of resources, and outlines actions that would be initiated if cultural resources were discovered onsite in the future.3

Larsen, Barbara L.

2005-11-01T23:59:59.000Z

279

Draft Management Plan Upper Snake Province  

E-Print Network [OSTI]

.......................................................................................4-5 Consistency with Idaho's Water Quality Management Plan...........................4-5 303(dDraft Management Plan Upper Snake Province Submitted To The Northwest Power and Conservation Quality Anti-Degradation Policy (39-3603) ............................................4-8 ESA and CWA

280

Office of Facilities Planning and Management  

E-Print Network [OSTI]

Office of Facilities Planning and Management Building Best Practices Through Energy Efficiency;Office of Facilities Planning and Management Recycling Plastics All Bottles and Cans Plastic Metal Glass All #1 and #2 Plastics Eg. Some salad containers NO Styrofoam Lab glass (including test tubes

Ford, James

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Integrated method to create optimal dynamic strategic plans for corporate technology start-ups  

E-Print Network [OSTI]

This thesis presents an innovative method for evaluating and dynamically planning the development of uncertain technology investments. Its crux centers on a paradigm shift in the way managers assess investments, toward an ...

Mikati, Samir Omar

2009-01-01T23:59:59.000Z

282

Civilian radioactive waste management program plan. Revision 2  

SciTech Connect (OSTI)

This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

NONE

1998-07-01T23:59:59.000Z

283

EXAMPLE FOR COMPLETE MANUSCRIPT STRATEGIC KNOWLEDGE MANAGEMENT IN SME BASED ON  

E-Print Network [OSTI]

EXAMPLE FOR COMPLETE MANUSCRIPT STRATEGIC KNOWLEDGE MANAGEMENT IN SME BASED ON INNOVATION TRANSFER University of Technology Cottbus, Germany ABSTRACT Added value for SME can be determine as knowledge question: whether a given algorithm that enables capital intellectual in SME index and implemented

284

U.S. Department of Energy clean cities five-year strategic plan.  

SciTech Connect (OSTI)

Clean Cities is a government-industry partnership sponsored by the U.S. Department of Energy's (DOE) Vehicle Technologies Program, which is part of the Office of Energy Efficiency and Renewable Energy. Working with its network of about 100 local coalitions and more than 6,500 stakeholders across the country, Clean Cities delivers on its mission to reduce petroleum consumption in on-road transportation. In its work to reduce petroleum use, Clean Cities focuses on a portfolio of technologies that includes electric drive, propane, natural gas, renewable natural gas/biomethane, ethanol/E85, biodiesel/B20 and higher-level blends, fuel economy, and idle reduction. Over the past 17 years, Clean Cities coalitions have displaced more than 2.4 billion gallons of petroleum; they are on track to displace 2.5 billion gallons of gasoline per year by 2020. This Clean Cities Strategic Plan lays out an aggressive five-year agenda to help DOE Clean Cities and its network of coalitions and stakeholders accelerate the deployment of alternative fuel and advanced technology vehicles, while also expanding the supporting infrastructure to reduce petroleum use. Today, Clean Cities has a far larger opportunity to make an impact than at any time in its history because of its unprecedented $300 million allocation for community-based deployment projects from the American Recovery and Reinvestment Act (ARRA) (see box below). Moreover, the Clean Cities annual budget has risen to $25 million for FY2010 and $35 million has been requested for FY2011. Designed as a living document, this strategic plan is grounded in the understanding that priorities will change annually as evolving technical, political, economic, business, and social considerations are woven into project decisions and funding allocations. The plan does not intend to lock Clean Cities into pathways that cannot change. Instead, with technology deployment at its core, the plan serves as a guide for decision-making at both the national and local levels of Clean Cities over the next five years. The plan recognizes the need for flexibility and sets out a strategic direction that will build on the progress of current technologies and new opportunities presented in emerging fuels and technologies, such as hydrogen and fuel cells, as well as new niche markets such as off-road applications that build additional throughput at existing alternative fuel stations.

Cambridge Concord Associates

2011-02-15T23:59:59.000Z

285

Automated transportation management system (ATMS) software project management plan (SPMP)  

SciTech Connect (OSTI)

The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

Weidert, R.S., Westinghouse Hanford

1996-05-20T23:59:59.000Z

286

CH 5 MANAGEMENT PLAN.DOC 5-1 5 Management Plan  

E-Print Network [OSTI]

CH 5 MANAGEMENT PLAN.DOC 5-1 5 Management Plan 5.1 Vision The Willamette Subbasin Plan Oversight drafted the following vision: Willamette Basin citizens from all walks of life prize and enjoy a quilt-work of natural areas, working landscapes, and distinctive communities, from the crest of the Coast Range

287

Data Management Plan (outline) The Data Management Plan (DMP) for a proposal is a two-page document that  

E-Print Network [OSTI]

Data Management Plan (outline) The Data Management Plan (DMP) for a proposal is a two-page document that describes (1) the investigator's commitment to the funder's Data Policy and (2) how the investigator plans to manage the data

288

2010 Annual Planning Summary for Civilian Radioactive Waste Management...  

Broader source: Energy.gov (indexed) [DOE]

Civilian Radioactive Waste Management (CRWM) 2010 Annual Planning Summary for Civilian Radioactive Waste Management (CRWM) Annual Planning Summaries briefly describe the status of...

289

MIDDLE SNAKE SUBBASINS MANAGEMENT PLAN SUPPLEMENT PRIORITIZED IMPLEMENTATION  

E-Print Network [OSTI]

MIDDLE SNAKE SUBBASINS MANAGEMENT PLAN SUPPLEMENT ­ PRIORITIZED IMPLEMENTATION NOVEMBER 24, 2004/Browsing..........................................................................................9 Key Limiting Factor #5: Water Quality............................................................................................................................11 Management Plan Considerations

290

Integrated Safety Management System as the Basis for Work Planning...  

Broader source: Energy.gov (indexed) [DOE]

Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development Integrated Safety Management System as the Basis for Work Planning and...

291

Waste Isolation Pilot Plant, Land Management Plan  

SciTech Connect (OSTI)

To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

Not Available

1993-12-01T23:59:59.000Z

292

Methylene Chloride Management Plan Review and Approval Authority  

E-Print Network [OSTI]

-8172 (Medical Consultation and Evaluation) Facilities Management Work Control Center (301) 405-2222 (RepairMETHYLENE CHLORIDE MANAGEMENT PLAN #12;#12;Methylene Chloride Management Plan Review and Approval Date #12;ii Methylene Chloride Management Plan #12;Methylene Chloride Management Plan Table of Contents

Rubloff, Gary W.

293

BSBA IN MANAGEMENT -HUMAN RESOURCE MANAGEMENT SPECIALIZATION ASSESSMENT PLAN  

E-Print Network [OSTI]

BSBA IN MANAGEMENT - HUMAN RESOURCE MANAGEMENT SPECIALIZATION ASSESSMENT PLAN (REV. 7 in Human Resource Management (HRM), the goal is to provide a foundation of all areas of human resources countries. · Content Delivered in: MGT 350, MGT 405, & MGT 357. · Assessment Method: Culminating exam

Gallo, Linda C.

294

HATCHERY AND GENETIC MANAGEMENT PLAN Hatchery Program  

E-Print Network [OSTI]

HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Hatchery Program: Species or Hatchery Stock: Agency-Arriving Summer/Fall Chinook 97 Table B.5 Tribal Incidental Take Thresholds for ESA-Listed 98 Upper Columbia River

295

Project Management Plan Examples 1- 80  

Broader source: Energy.gov [DOE]

The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. Thedescriptions below should be used to navigate to the subject of...

296

Imnaha Subbasin Management Plan Subbasin Lead Entity  

E-Print Network [OSTI]

Imnaha Subbasin Management Plan May 2004 Written by Ecovista Subbasin Lead Entity: Nez Perce Tribe....................................................................................... 6 1.2.4 Ecovista Website Information.......................................................................... 59 4.3 Terrestrial Data and Information Gaps

297

Safeguards and Security Program Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Cancels: DOE N 473.9 and DOE M 470.1-1

2005-08-26T23:59:59.000Z

298

Safeguards and Security Program Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The manual establishes program planning and management requirements for the Departments Safeguards and Security. Chg 1, dated 3-7-06 Cancels DOE N 473.9, DOE M 470.1-1 Chg 2.

2005-08-26T23:59:59.000Z

299

1. Emergency Management Plan ACTIVE SHOOTER RESPONSE  

E-Print Network [OSTI]

1. Emergency Management Plan ACTIVE SHOOTER RESPONSE #12;The world has changed!The world has ­ But can transition to one of these #12;Why is this Necessary? Within the last five years, there have been

300

It Risk Management: From IT Necessity to Strategic Business Value  

E-Print Network [OSTI]

With information technology becoming an increasingly important part of every enterprise, managing IT risk has become critically important for CIOs and their business counterparts. However, the complexity of IT makes it ...

Westerman, George

2007-12-07T23:59:59.000Z

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Natural Resource Management Plan Update  

E-Print Network [OSTI]

wood industry, some farming in area of Solar Farm 3 #12;History of Natural Resource Management Formal

Homes, Christopher C.

302

Strategic backdrop analysis for fossil fuel planning. Task 1. Default Case. Report 468-117-07/03  

SciTech Connect (OSTI)

This report presents data describing a default case analysis performed using the strategic backdrop analytical framework developed to facilitate fossil fuel planning within the DOE. Target years are 1985, 2000, and 2025. Residential, commercial, and industrial energy demands and impacts of energy technology implementation and market penetration are forecast using a set of energy technology assumptions.

Not Available

1980-06-01T23:59:59.000Z

303

Strategic backdrop analysis for fossil fuel planning. Task 1. Default Case. Report 468-117-07/01  

SciTech Connect (OSTI)

This report presents data describing a default case analysis performed using the strategic backdrop analytical framework developed to facilitate fossil fuel planning within the DOE. Target years are 1985 and 2025. Residential, commercial, and industrial energy demands are forecast as well as the impacts of energy technology implementation and market penetration using a set of energy technology assumptions. (DMC)

Not Available

1980-06-01T23:59:59.000Z

304

Strategic backdrop analysis for fossil fuel planning. Task 1. Default Case. Report 468-117-07/02  

SciTech Connect (OSTI)

This report presents data describing a default case analysis performed using the strategic backdrop analytical framework developed to facilitate fossil fuel planning within the DOE. Target years are 1985, 2000, and 2025. Residential, commercial, and industrial energy demands and impacts of energy technology implementation and market penetration are forecast using a set of energy technology assumptions. (DMC)

Not Available

1980-06-01T23:59:59.000Z

305

Information Resources Management Strategic Plan Appendix FY2014...  

Office of Environmental Management (EM)

develop a governance model that provides a forum for discussing and adjudicating corporate requirements, policies, and standards. The resulting IT governance board will...

306

Rangeland Resource Management for Texans: Strategic Planning for Success (Spanish)  

E-Print Network [OSTI]

podr? relacionar con otras metas siempre y cuando no haya otras metas contradicto- rias. Y puede rastrearse porque las UA por a?o anuales se pueden medir cada a?o para ver si se est? cumpliendo la meta. Considerando el Ambiente Cuando haya establecido... brecha se puede cerrar, quiz?s por medio de expansi?n o diversificaci?n, el siguiente paso es desarrollar estrategias ade- cuadas para alcanzar las metas. Este es el nivel de planeaci?n en donde se toman las decisiones operativas diarias. No hay estrate...

Fox, William E.

2004-12-22T23:59:59.000Z

307

Rangeland Resource Management for Texans: Strategic Planning for Success  

E-Print Network [OSTI]

are. The mission should neither limit nor overextend the enterprise. It should be as broad as possible without being unrealistic. Setting Goals Once you have defined your mission you can set goals for fulfilling that mission. The best goals are SMART... attainable? How would you measure success or track progress toward such goals? An example of a SMART goal might be: ?To sustain the resource so that it maintains a 1,200 AU per year productiv- ity over my lifetime.? It is specific. It is measurable over...

Fox, William E.

2002-03-04T23:59:59.000Z

308

One common way - The strategic and methodological influence on environmental planning across Europe  

SciTech Connect (OSTI)

In the last decades the European Union exerted influence on precautionary environmental planning by the establishment of several Directives. The most relevant were the Habitat-Directive, the EIA-Directive, the SEA-Directive and the Water Framework Directive. Comparing these EU policies in the area of environmental precaution it becomes obvious that there is a lot of common ground. Thus, the conclusion seems likely that the European Union, in doing so, has intended to establish general planning concepts through introducing several methodological steps indicated by the regulations. The goal of this article is firstly to point out, which are the common planning principles, converted by methodological elements and secondly examine the consideration of these planning concepts by the implementation and application in the member states. In this context it is analysed whether the connections and divergences between the directives lead to significant differences in the implementation process. To this aim the directives are shortly introduced and significant steps of the processes regulated by them are outlined. In the second steps the national legal implementation in the Alpine states and its consequences for the practical application are discussed. The results show a heterogeneous application of the EU principles. Within the comparative view on the four directives influence and causalities between the national implementation and the practical application were identified, which can be simplified as four types. Since a coherent strategic and methodological concept for improving environmental precaution planning from part of the EU is noticeable, more unity and comparability within the implementation is desirable, particularly in areas with comparable habitats such as the alpine space. Beyond this the trade-off between the directives poses an important task for the future.

Jiricka, Alexandra, E-mail: alexandra.jiricka@boku.ac.a [Institute of Landscape Development, Recreation and Conservation Planning (ILEN), Department of Spatial, Landscape and Infrastructure Science, University of Natural Resources and Applied Life Sciences Vienna, Peter Jordan-Strasse 82, A-1190 Vienna (Austria); Proebstl, Ulrike, E-mail: ulrike.proebstl@boku.ac.a [Institute of Landscape Development, Recreation and Conservation Planning (ILEN), Department of Spatial, Landscape and Infrastructure Science, University of Natural Resources and Applied Life Sciences Vienna, Peter Jordan-Strasse 82, A-1190 Vienna (Austria)

2009-11-15T23:59:59.000Z

309

EXECUTIVESUMMARY The 2013-2018 Strategic Plan builds on the success of previous plans  

E-Print Network [OSTI]

, refining institutional priorities and measuring outcomes as depicted in the updated planning for Florida in the global economy · USF will pursue a more secure economic base, greater operational problems. In addition to being an important part of the Tampa Bay economy, USF undertakes ambitious

Meyers, Steven D.

310

StrategicDoing "Strategic doing leads to 'link and  

E-Print Network [OSTI]

and workforce development professionals relied on traditional strategic planning to answer these questions these innovations strategically? Conventional strategic planning does not work well. The process is too rigid, too. The problem is that conventional strategic planning does not work well. It is too slow, inflexible

311

Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan  

SciTech Connect (OSTI)

The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

Fix, N. J.

2008-02-20T23:59:59.000Z

312

2011-2015 Human Capital Management Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

This Human Capital Management Plan (HCMP or Plan) shows how we intend to recruit, hire, train, develop, and retain such employees. 2011-2015 Human Capital Management Plan More...

313

6 Management Plan 6.1.1 Introduction  

E-Print Network [OSTI]

management). The management plan is made up of six components: 1) the vision for the subbasin; 2) the working management is used to respond to the outcomes of these "tests" of "working hypotheses." Hypotheses192 6 Management Plan 6.1.1 Introduction Emphasis in this management plan is placed on selected

314

Ground water protection management program plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 5400.1 requires the establishment of a ground water protection management program to ensure compliance with DOE requirements and applicable federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office was prepared this Ground Water Protection Management Program Plan (ground water protection plan) whose scope and detail reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter III, for special program planning. This ground water protection plan highlights the methods designed to preserve, protect, and monitor ground water resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies technical guidance documents and site-specific documents for the UMTRA Project ground water protection management program. In addition, the plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA Project sites.

Not Available

1994-02-01T23:59:59.000Z

315

Oak Ridge National Laboratory Waste Management Plan  

SciTech Connect (OSTI)

The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

Not Available

1991-12-01T23:59:59.000Z

316

Tribal Renewable Energy Foundational Course: Strategic Energy...  

Broader source: Energy.gov (indexed) [DOE]

Strategic Energy Planning Tribal Renewable Energy Foundational Course: Strategic Energy Planning Watch the U.S. Department of Energy Office of Indian Energy foundational course...

317

CRAD, Configuration Management Assessment Plan  

Broader source: Energy.gov [DOE]

The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders.

318

Project Hanford management contract quality improvement project management plan  

SciTech Connect (OSTI)

On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

ADAMS, D.E.

1999-03-25T23:59:59.000Z

319

Hanford cultural resources management plan  

SciTech Connect (OSTI)

As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

Chatters, J.C. (ed.)

1989-06-01T23:59:59.000Z

320

HATCHERY AND GENETIC MANAGEMENT PLAN Hatchery Program  

E-Print Network [OSTI]

HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Hatchery Program: Species or Hatchery Stock: Agency Take Thresholds for ESA-Listed 44 Upper Columbia River Steelhead Table 4. Tribal & Recreational Incidental Take Thresholds 45 for Unmarked Spring Chinook Table 5. Estimated Carrying Capacity of Natural

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Water quality management plan for Cherokee Reservoir  

SciTech Connect (OSTI)

The management plan provides an assessment of Cherokee Reservoir's current water quality, identifies those factors which affect reservoir water quality, and develops recommendations aimed at restoring or maintaining water quality at levels sufficient to support diverse beneficial uses. 20 references, 8 figures, 15 tables. (ACR)

Not Available

1984-01-01T23:59:59.000Z

322

Data Management Plan Types of Data  

E-Print Network [OSTI]

Data Management Plan Types of Data The research described herein will lead to the discovery of new will be followed by electrochemistry, Raman spectroscopy and optical spectroscopy. All data will be stored electronically in word processing documents. Data Standards All data will be stored in an electronic format

Tam, Tin-Yau

323

Agricultural Systems Management UNOFFICIAL DEGREE PLAN  

E-Print Network [OSTI]

Agricultural Systems Management UNOFFICIAL DEGREE PLAN STUDENT'S NAME: Catalog 2011 STUDENT'S ID 310 (2-2) 3 AGSM 301; AGEC 330 STAT 302 (3-0) or MATH 141 Tech. Elective3 3 STAT 303 (3-0) 3 MATH 141

324

Hanford emergency management plan - release 15  

SciTech Connect (OSTI)

The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

CARPENTER, G.A.

1999-07-19T23:59:59.000Z

325

On Integrating Theories of International Economics in the Strategic Planning of Global Supply Chains and Dynamic Supply Chain Reconfiguration with Capacity Expansion and Contraction  

E-Print Network [OSTI]

that incorporating them in the form of readily available individual competitiveness indicators in OR/MS models offers promise to enhance decision-support for the strategic planning of global supply chains in general, and for locating facilities in particular...

Lee, Chaehwa

2012-02-14T23:59:59.000Z

326

Report to the Environmental Management Advisory Board  

Office of Environmental Management (EM)

the United States Department of Energy Environmental Management Strategic Planning Communication Tool Submitted by the Risk Communications Subcommittee Date - June 14, 2013...

327

Nevada Test Site Resource Management Plan  

SciTech Connect (OSTI)

The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

NONE

1998-12-01T23:59:59.000Z

328

The University of Montana continues its commitment to increased accountability and linkage of Planning, Resource Allocation, and Assessment. This second annual Institutional Assessment Report illustrates not only that commitment,  

E-Print Network [OSTI]

of Planning, Resource Allocation, and Assessment. This second annual Institutional Assessment Report. Strategic planning, budgeting, implementation, and assessment are essential components of the resource illustrates not only that commitment, but also the positive outcomes of strategic resource management

Vonessen, Nikolaus

329

Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository  

SciTech Connect (OSTI)

If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required for a construction authorization. The LA must also support a licensing proceeding before an Atomic Safety and Licensing Board panel prior to NRC action on any decision to authorize construction. The DOE has established a strategic basis for planning that is intended to provide the framework for development of an integrated plan for activities leading to preparation and submittal of a LA.

Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

2002-02-26T23:59:59.000Z

330

Strategic Planning Session Perspective Strategic Objective Goal Lag Measures/Lead Measures Target Actual 4th Quarter  

E-Print Network [OSTI]

proj/year 200 = bchmk; goal 210 46.7% AnnualAnnual Annual Facilities Management FY 2011 Balanced positive on customer sat survey Budget 6.1.1 Balanced Budget.3.1 Energy Usage by 2015 30% 6.3.2 Water Usage by 2010 20% or 43 Gal/GSF Improve HUB Participation 6.5.1 12

Howitt, Ivan

331

STRATEGIC ROADMAP College of Engineering  

E-Print Network [OSTI]

STRATEGIC ROADMAP College of Engineering College of Engineering Oregon State University 101 Covell our strate- gic plan once the university's strategic plan is complete. This roadmap is an informal

Tullos, Desiree

332

A Spatial Planning and Analysis System for Wildland Fire Management  

E-Print Network [OSTI]

STARFIRE 11/29/2011 A Spatial Planning and Analysis System for Wildland Fire Management Welcome is an advanced and powerful spatial fire management planning and analysis system which is designed to provide visual and analytic support for fire management planning, decisions and communication. The system

333

NARSTO Quality Planning and Data Management Handbooks Executive Summary  

E-Print Network [OSTI]

'existingqualityassuranceprograms. The first of the three documents, the NARSTO Quality Systems Management Plan (QSMP), is the umbrella underNARSTO Quality Planning and Data Management Handbooks Executive Summary This brief Executive, and guidance documents for quality planning and data management. NARSTO is a non-binding, tri-national public

334

Agricultural Systems Management UNOFFICIAL DEGREE PLAN  

E-Print Network [OSTI]

Agricultural Systems Management UNOFFICIAL DEGREE PLAN STUDENT'S NAME: Catalog 2013 STUDENT'S ID AGSM 315 (2-2) 3 PHYS 201 AGEC 340 (3-0) 3 U3/U4 AGSM 325 (2-2) 3 STAT 302 (3-0) or MATH 141 Tech. Elective3 3 STAT 303 (3-0) 3 MATH 141 15 Am. Hist. Elect1 (3-0) 3 15 SENIOR AGEC 315 (3-0) or U3/U4 AGSM

Behmer, Spencer T.

335

River Protection Project (RPP) Project Management Plan  

SciTech Connect (OSTI)

The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

NAVARRO, J.E.

2001-03-07T23:59:59.000Z

336

5 Management Plan The management plan described in this section is a culmination of extraordinary efforts by the  

E-Print Network [OSTI]

work together to "derive" and establish the key elements of the Management Plan. Assessment290 5 Management Plan The management plan described in this section is a culmination as a laborious result of carrying out the assessment and inventory work and formation of the vision, goals

337

John Day Subbasin Revised Draft Plan March 15, 2005 5. Management Plan  

E-Print Network [OSTI]

John Day Subbasin Revised Draft Plan March 15, 2005 224 5. Management Plan The Management Plan land managers, makes efficient use of resources and respects property rights. The result will be sustainable, resource-based activities that contribute to the social, cultural and economic well

338

Strategic Petroleum Reserve annual/quarterly report  

SciTech Connect (OSTI)

During 1992 the Department continued planning activities for the expansion of the Strategic Petroleum Reserve to one billion barrels. A draft Environmental Impact Statement for the five candidate sites was completed in October 1992, and a series of public hearings was held during December 1992. Conceptual design engineering activities, life cycle cost estimates and geotechnical studies to support the technical requirements for an Strategic Petroleum Reserve Plan Amendment were essentially completed in December 1992. At the end of 1992, the Strategic Petroleum Reserve crude oil inventory was 574.7 million barrels and an additional 1.7 million barrels was in transit to the Reserve. During 1992 approximately 6.2 million barrels of crude oil were acquired for the Reserve. A Department of Energy Tiger Team Environmental, Safety and Health (ES&H) Assessment was conducted at the Strategic Petroleum Reserve from March 9 through April 10, 1992. In general, the Tiger Team found that Strategic Petroleum Reserve activities do not pose undue environmental, safety or health risks. The Strategic Petroleum Reserve`s Final Corrective Action Plan, prepared in response to the Tiger Team assessment, was submitted for Department approval in December 1992. On November 18, 1992, the Assistant Secretary for Fossil Energy selected DynMcDennott Petroleum Operations Company to provide management and operating services for the Strategic Petroleum Reserve for a period of 5 years commencing April 1, 1993. DynMcDermott will succeed Boeing Petroleum Services, Inc.

Not Available

1993-02-16T23:59:59.000Z

339

Office of the Chief Financial Officer Strategic Plan 2008-2012  

E-Print Network [OSTI]

their budgets and workforce planning. Decision support (datateam is to focus on workforce planning, its alignment with

Various

2008-01-01T23:59:59.000Z

340

int. j. prod. res., 01 June 2004, vol. 42, no. 11, 21972206 Strategic capacity planning in supply chain design for a new market  

E-Print Network [OSTI]

, capacity planning, transportation network design, identification of distributors in the potential marketint. j. prod. res., 01 June 2004, vol. 42, no. 11, 2197­2206 Strategic capacity planning in supply chain design for a new market opportunity SATYAVEER S. CHAUHANy, RAKESH NAGIz and JEAN-MARIE PROTHy

Nagi, Rakesh

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

UMTRA Project Office Records Management Plan  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Office maintains two distinct records handling areas. One of the areas is maintained by a Technical Assistance Contractor (TAC), and is referred to as the UMTRA Project Document Control Center (UPDCC). The UPDCC manages all UMTRA records except those dealing with contracts, personnel, budgeting, finance, and any other documents which are of a purely administrative nature. The second area, the UMTRA Project Administrative Files Collection (UPAFC), contains all those records listed above that are not managed by the UPDCC. This Records Management Plan (RMP) for the UPAFC will be the framework for identifying the elements and activities that relate to the management and operational aspects involved in the handling of UPAFC. Guidelines for the program will be obtained from US Department of Energy (DOE) Orders. DOE Orders implement the guidelines issued by the National Archives and Records Administration (NARA), the final authority for records management. The RMP will address the life cycle of records, including their creation, maintenance, use, and disposition.

Not Available

1993-06-01T23:59:59.000Z

342

Rangeland Drought Management for Texans: Planning: The Key to Surviving Drought  

E-Print Network [OSTI]

This publication outlines the steps that ranchers should take to survive a drought. Those steps include developing a plan for each enterprise of the operation, ranking strategic ranch goals, planning for resource flow, implementing and monitoring...

Hart, Charles R.; Carpenter, Bruce B.

2001-05-02T23:59:59.000Z

343

The University of Oklahoma OU RETIREMENT PLANS MANAGEMENT COMMITTEE  

E-Print Network [OSTI]

The University of Oklahoma OU RETIREMENT PLANS MANAGEMENT COMMITTEE March 30, 2011 President Boren established the OU Retirement Plans Management Committee to identify ways for OU to help increase its,000 OU employees participating in the retirement savings plans. A transition period to the master

Oklahoma, University of

344

James F. Argue Nuclear Engineering and Planning Manager  

E-Print Network [OSTI]

James F. Argue Nuclear Engineering and Planning Manager Portsmouth Naval Shipyard Naval Sea Systems Command In June of 2003 Mr. Argue was assigned as the Nuclear Engineering and Planning Manager, a Senior Executive position. Mr. Argue is the head of the Nuclear Engineering and Planning Department

345

Safeguards and Security Program Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The manual establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Change 2 is a revision to Section M of both the Manual and the CRD to realign the process for establishing deviations from DOE directives containing safeguards and security requirements to reflect established Departmental policy as set forth in DOE O 251.1C. Original publication, 8-26-05; Chg 1, 3-7-06. Canceled by DOE O 470.4B

2005-08-26T23:59:59.000Z

346

Paducah Site Management Plan | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecemberInitiativesNationalNuclearRocky Mountain OTCAnnualEnd StateManagement Plan

347

The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan  

SciTech Connect (OSTI)

The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

Fix, N. J.

2009-04-03T23:59:59.000Z

348

Quantitative Methods for Strategic and Investment Planning in the Oil-Refining  

E-Print Network [OSTI]

by one refinery Refinery Opera*onal Planning - Simulate the Refining Scenarios Supply Chain Investments Planning - Test the refinery best scenarios

Grossmann, Ignacio E.

349

Water Resource Planning and Management using Motivated Machine JANUSZ STARZYK  

E-Print Network [OSTI]

1 Water Resource Planning and Management using Motivated Machine Learning JANUSZ STARZYK School@ohio.edu Abstract Water resources planning and management require problem resolution and optimized use of resources. Since many objectives in water management are conflicting, it is hard to devise one optimum strategy

Starzyk, Janusz A.

350

8 Management Plan 8.1.1 Introduction  

E-Print Network [OSTI]

management and use of natural resources including reliable water supplies, fish and wildlife populations145 8 Management Plan 8.1.1 Introduction The information below will be used by subbasin planners that will aid in the recovery of focal species. The management plan is made up of five components: the vision

351

Arid Lands Ecology Facility management plan  

SciTech Connect (OSTI)

The Arid Lands Ecology (ALE) facility is a 312-sq-km tract of land that lies on the western side of the Hanford Site in southcentral Washington. The US Atomic Energy Commission officially set aside this land area in 1967 to preserve shrub-steppe habitat and vegetation. The ALE facility is managed by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) for ecological research and education purposes. In 1971, the ALE facility was designated the Rattlesnake Hills Research Natural Area (RNA) as a result of an interagency federal cooperative agreement, and remains the largest RNA in Washington. it is also one of the few remaining large tracts of shrub-steppe vegetation in the state retaining a predominant preeuropean settlement character. This management plan provides policy and implementation methods for management of the ALE facilities consistent with both US Department of Energy Headquarters and the Richland Field Office decision (US Congress 1977) to designate and manage ALE lands as an RNA and as a component of the DOE National Environmental Research Park System.

None

1993-02-01T23:59:59.000Z

352

Water Management Plans for Surface Coal Mining Operations (North Dakota)  

Broader source: Energy.gov [DOE]

A water management plan is required for all surface coal mining operations. This plan must be submitted to the State Engineer of the State Water Commission at the same time a surface mining permit...

353

Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1  

SciTech Connect (OSTI)

In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

NONE

1995-09-01T23:59:59.000Z

354

Management and operating contractor plan for transition to the project Hanford Management Contractor  

SciTech Connect (OSTI)

This is Revision 1 to the M{ampersand}O Contractor Plan for Transition to the Project Hanford Management Contractor.

Waite, J.L., Westinghouse Hanford

1996-06-27T23:59:59.000Z

355

Analysis Methods and Tools Standing Technical Committee Strategic...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Analysis Methods and Tools Standing Technical Committee Strategic Plan Analysis Methods and Tools Standing Technical Committee Strategic Plan This report outlines the gaps,...

356

U.S. Department of Energy 2014 Strategic Sustainability Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2014 Strategic Sustainability Performance Plan U.S. Department of Energy 2014 Strategic Sustainability Performance Plan Document displays the U.S. Department of Energy's 2014...

357

Pacific Northwest National Laboratory Institutional Plan FY 2000-2004  

SciTech Connect (OSTI)

The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.

Pearson, Erik W.

2000-03-01T23:59:59.000Z

358

area management plan: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 NEW RIVER AREA OF CRITICAL ENVIRONMENTAL CONCERN MANAGEMENT PLAN CiteSeer Summary: New River is a dynamic, ever-changing system influenced by biological, climatological,...

359

Spent Nuclear Fuel project integrated safety management plan  

SciTech Connect (OSTI)

This document is being revised in its entirety and the document title is being revised to ``Spent Nuclear Fuel Project Integrated Safety Management Plan.

Daschke, K.D.

1996-09-17T23:59:59.000Z

360

Integrated Planning and Management for Urban Water Supplies  

E-Print Network [OSTI]

Positions for Water Supply Reliability ................................. 15 4 Shortage Management Modeling.2: Diagram of Water Supply Reliability Model Structure ..................49 5.3: Steps Used in ShortageIntegrated Planning and Management for Urban Water Supplies Considering Multiple Uncertainties Jay

Pasternack, Gregory B.

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Idaho National Laboratory Cultural Resource Management Plan  

SciTech Connect (OSTI)

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

Julie Braun Williams

2013-02-01T23:59:59.000Z

362

Idaho National Laboratory Cultural Resource Management Plan  

SciTech Connect (OSTI)

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

Lowrey, Diana Lee

2011-02-01T23:59:59.000Z

363

Idaho National Laboratory Cultural Resource Management Plan  

SciTech Connect (OSTI)

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

Lowrey, Diana Lee

2009-02-01T23:59:59.000Z

364

Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan  

SciTech Connect (OSTI)

A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

1992-06-01T23:59:59.000Z

365

An Institutional Analysis of Oil and Gas Sector Development and Environmental Management in the Yukon Territory.  

E-Print Network [OSTI]

??This thesis investigates the ways in which oil and gas development priorities and concern for the environment are integrated within strategic planning and management frameworks, (more)

May, Jason C.

2007-01-01T23:59:59.000Z

366

Development of the Office of Civilian Radioactive Waste Management National Transportation Plan  

SciTech Connect (OSTI)

The Director of the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) designated development of the National Transportation Plan (NTP) as one of his four strategic objectives for the program. The Office of Logistics Management (OLM) within OCRWM was tasked to develop the plan, which will accommodate state, local, and tribal concerns and input to the greatest extent practicable. The plan will describe each element of the national transportation system that OCRWM is developing for shipping spent nuclear fuel and high-level radioactive waste to the proposed geologic repository at Yucca Mountain, Nevada. The plan will bring together OCRWM's approach for acquiring capital assets (casks, rail cars, and a rail line in Nevada) and its operational planning efforts in a single, comprehensive document. It will also provide a timetable for major transportation decisions and milestones needed to support a 2017 start date for shipments to the Yucca Mountain repository. The NTP will be revised to incorporate new developments and decisions as they are finalized. This paper will describe the elements of the NTP, its importance in providing a comprehensive overview of the national transportation system, and the role of stakeholders in providing input on the NTP and the national transportation system. (authors)

Macaluso, C. [U.S. Department of Energy, Office of Civilian Radioactive Waste Management, Washington, DC (United States); Offner, J.; Patric, J. [Booz Allen Hamilton, Washington, DC (United States)

2008-07-01T23:59:59.000Z

367

Technical Assistance Contractor management plan. Revision 1  

SciTech Connect (OSTI)

The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

NONE

1995-08-01T23:59:59.000Z

368

National Aeronautics and Space Administration -1 NASA 2012 Strategic Sustainability Performance Plan  

E-Print Network [OSTI]

-performance sustainable buildings; · utilize power management options and reduce the number of Agency data centers

Waliser, Duane E.

369

Uranium Mill Tailings Remedial Action Project surface project management plan  

SciTech Connect (OSTI)

This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

Not Available

1994-09-01T23:59:59.000Z

370

Appendix 22 Draft Nutrient Management Plan and Total Maximum Daily  

E-Print Network [OSTI]

Appendix 22 Draft Nutrient Management Plan and Total Maximum Daily Load for Flathead Lake, Montana. #12;11/01/01 DRAFT i October 30, 2001 Draft Nutrient Management Plan and Total Maximum Daily Load..............................................................................................................................2-11 SECTION 3.0 APPLICABLE WATER QUALITY STANDARDS

371

Mitch S. Daugherty Nuclear Engineering and Planning Manager  

E-Print Network [OSTI]

Mitch S. Daugherty Nuclear Engineering and Planning Manager Naval Sea Systems Command, Norfolk Naval Shipyard Mitch Daugherty is the Nuclear Engineering and Planning Manager and the senior civilian. Daugherty also headed the Nuclear Refueling Division, the Nuclear Test Engineering Division, and the Nuclear

372

INL Site Executable Plan for Energy and Transportation Fuels Management  

SciTech Connect (OSTI)

It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

Ernest L. Fossum

2008-11-01T23:59:59.000Z

373

Strategic Plan Table of Contents-IG Ltr 3-22.pub  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from the GridwiseSiteDepartment ofCreatingCellStrategicYears 2003 - 2008 U . S . D e p

374

Strategic Plan for Groundwater Monitoring at the Waste Isolation Pilot Plant  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout » Staff125,849| OSTI, US Dept ofStrategic

375

SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning  

E-Print Network [OSTI]

Planning Tools from Morehead A Word about Morehead's Workforce Commitment Model Technical Support Section 2 Activities Appendices Appendix 1 ­ Workforce Commitment Domains Summary Appendix 2 ­ Action Plan Form #12SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning A guide designed to help

Squire, Larry R.

376

Comparative Biomedical Sciences Strategic Plan March 21, 2011 The goals of the Department of Comparative Biomedical Sciences will be to seek and obtain excellence  

E-Print Network [OSTI]

1 1 Comparative Biomedical Sciences Strategic Plan March 21, 2011 GOALS The goals of the Department of Comparative Biomedical Sciences will be to seek and obtain excellence in our performance: Developing Leaders in Veterinary and Biomedical Careers: CBS will focus on a learning environment

377

Lac du Flambeau Band of Lake Superior Chippewa Indians Strategic Energy Plan  

SciTech Connect (OSTI)

This plan discusses the current energy use on the Lac du Flambeau Reservation, the current status of the Tribe's energy program, as well as the issues and concerns with energy on the reservation. This plan also identifies and outlines energy opportunities, goals, and objectives for the Tribe to accomplish. The overall goal of this plan is to address the energy situation of the reservation in a holistic manner for the maximum benefit to the Tribe. This plan is an evolving document that will be re-evaluated as the Tribe's energy situation changes.

Bryan Hoover

2009-11-16T23:59:59.000Z

378

Pacific Northwest National Laboratory Institutional Plan FY 2001-2005  

SciTech Connect (OSTI)

The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

Fisher, Darrell R.; Pearson, Erik W.

2000-12-29T23:59:59.000Z

379

Implementation Plan for the Office of Nuclear Energy Knowledge Management Program  

SciTech Connect (OSTI)

The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

Kimberlyn C. Mousseau

2011-12-01T23:59:59.000Z

380

Energy Efficiency Improvement and Cost Saving Opportunities for Cement Making. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

strategic energy management programin a strategic energy management program are depicted inof a strategic energy management program A successful

Worrell, Ernst

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

BNL-100708-2013 Cultural Resource Management Plan  

E-Print Network [OSTI]

BNL-100708-2013 Cultural Resource Management Plan for Brookhaven National Laboratory May 2013 of this manuscript, or allow others to do so, for United States Government purposes. #12;Cultural Resource Management Cultural Resources CRC Cultural Resources Coordinator CRM Cultural Resource Management CRMP Cultural

382

Strategic Plan 2010-2015 Strategy Task Force Objective(s) Tactics  

E-Print Network [OSTI]

Master Plan Identify opportunities for physical improvement (estimate costs) VP for Administration Metrics Resources Expense Allocation Baseline Metric Target Target Completion Date Progress Toward Target projects Money spent Fund allocation FY11 Capital Project List Prioritized list Community #2: Nick

Bieber, Michael

383

The RHIC Mid-Term Strategic Plan Status as of February 2008  

E-Print Network [OSTI]

construction in FY 2010, a one-year delay from the schedule shown in the Mid-Term plan. As a result on February 14, 2006. The document can be found at: http://www.bnl.gov/npp/docs/RHICpl

384

Integrating the principles of strategic environmental assessment into local comprehensive land use plans in California  

E-Print Network [OSTI]

The lack of early integration with the planning and decision-making process has been a major problem in environmental assessment. Traditional project-based environmental impact assessment has inadequate incentives and capacities to incorporate...

Tang, Zhenghong

2009-05-15T23:59:59.000Z

385

Los Alamos National Laboratory emergency management plan. Revision 1  

SciTech Connect (OSTI)

The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

Ramsey, G.F.

1998-07-15T23:59:59.000Z

386

The application of strategic environmental assessment in a non-mandatory context: Regional transport planning in New Zealand  

SciTech Connect (OSTI)

There is no legal mandate for strategic environmental assessment (SEA) in New Zealand. However, a requirement to consider environmental and sustainability issues is a key feature of many statutes, including that relating to regional transport planning. Given this, the research sought to determine whether SEA could be used to improve the incorporation of environmental and sustainability aspects into the regional transport planning process in New Zealand. Existing practice was evaluated, examining what factors currently limiting the consideration of environmental and sustainability issues and to what extent elements of SEA are currently being used. The research culminated in the development of a conceptual model where SEA elements could be incorporated into the existing framework to promote improved consideration of environmental and sustainability issues. The results provide some reassurance about the value of SEA even where its application is not legally mandated. However, it also highlighted some ongoing issues around the integration of SEA in existing frameworks and around the scope of SEA as a decision-aiding tool. -- Highlights: The research examined whether SEA can provide benefits even where it is not mandated. The research examined the extent to which SEA elements are currently being used. A conceptual model was developed to incorporate necessary SEA elements into an existing framework.

McGimpsey, Paul, E-mail: paul.mcgimpsey@urs.com [URS, St. George's House, 5 St. George's Road, London SW19 4DR (United Kingdom)] [URS, St. George's House, 5 St. George's Road, London SW19 4DR (United Kingdom); Morgan, Richard K., E-mail: rkm@geography.otago.ac.nz [Department of Geography, University of Otago, PO Box 56, Dunedin 9054 (New Zealand)

2013-11-15T23:59:59.000Z

387

Natural Resource Management Plan for Brookhaven National Laboratory  

SciTech Connect (OSTI)

This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).

green, T.

2011-08-15T23:59:59.000Z

388

Strategic Training and Employee Development Plan FY2013-2015 EXECUTIVE OVERVIEW  

E-Print Network [OSTI]

and coordinate educational programs using industry-leading methodology and technology to effectively support individual employee skills, training systems, and senior management leadership programs have created a solid programs, interviews have been conducted with key functional OCFO managers, ad hoc trainers, and others

389

Energy Efficiency Improvement and Cost Saving Opportunities for the Petrochemical Industry - An ENERGY STAR(R) Guide for Energy and Plant Managers  

E-Print Network [OSTI]

strategic energy management program. ..in a strategic energy management program are depicted inof a strategic energy management program. Evaluating

Neelis, Maarten

2008-01-01T23:59:59.000Z

390

Energy Efficiency Improvement and Cost Saving Opportunities for the Fruit and Vegetable Processing Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

Strategic Energy Management Program .Systems A Strategic Energy Management Program Changing howin a strategic energy management program are depicted in

Masanet, Eric

2008-01-01T23:59:59.000Z

391

Social Impact Management Plans: Innovation in corporate and public policy  

SciTech Connect (OSTI)

Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes assessment, management and monitoring to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: Social impact management plans are effective strategies to manage social issues. They are developed in partnership with regulatory agencies, investors and community. SIMPs link assessment to ongoing management and address social and community issues. SIMPs clarify responsibilities in the management of impacts, opportunities and risks. SIMPs demonstrate a shift to include management as a core component of SIA practice.

Franks, Daniel M., E-mail: d.franks@uq.edu.au [Centre for Social Responsibility in Mining, The University of Queensland, Sustainable Minerals Institute, St Lucia, Brisbane, Queensland 4072 (Australia); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)] [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)

2013-11-15T23:59:59.000Z

392

FY 1999 Spent Nuclear Fuel Interim Management Plan  

SciTech Connect (OSTI)

This document has been prepared to present in one place the near and long-term plans for safe management of SRS SNF inventories until final disposition has been identified and implemented.

Dupont, M.

1998-12-21T23:59:59.000Z

393

Economic and Hydrologic Implications of Proposed Edwards Aquifer Management Plans  

E-Print Network [OSTI]

, according to Texas water law, ground water is a property right vested with the land owner. Throughout at least the past two decades, attempts to negotiate voluntary management plans to restrict pumpage have been unsuccessful, even though demand is projected...

Dillon, Carl R.; Jones, Lonnie L.; Williams, R. Lynn; Jordan, Wayne R.; McCarl, Bruce A.

394

Nevada Test Site Resource Management Plan: Annual summary, January 2000  

SciTech Connect (OSTI)

The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

NONE

2000-01-01T23:59:59.000Z

395

BLM - Approved Resource Management Plan Amendments/Record of...  

Open Energy Info (EERE)

Approved Resource Management Plan AmendmentsRecord of Decision for Solar Energy Development in Six Southwestern States Jump to: navigation, search OpenEI Reference LibraryAdd to...

396

Knowledge and plan execution management in planning fire fighting operations  

E-Print Network [OSTI]

.dev@decsai.ugr.es Departmento de Ciencias de la Computaci´on e Inteligencia Artificial. E.T.S. Ingenieria Informatica] or civil [2] domains. These AI planning techniques are only the core of more complex architectures that may

Fernández Olivares, Juan

397

Program Academic Quality Plan Department of Construction Management  

E-Print Network [OSTI]

Program Academic Quality Plan Department of Construction Management Bowling Green State University://www.bgsu.edu/colleges/technology/undergraduate/cmt/index.html Integral in this effort is our Program Academic Quality Plan. I. Bowling Green State University Mission Bowling Green State University provides educational experiences inside and outside the classroom

Moore, Paul A.

398

2012 Annual Planning Summary for Legacy Management  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Legacy Management.

399

Finance and supply management project execution plan  

SciTech Connect (OSTI)

As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

BENNION, S.I.

1999-02-10T23:59:59.000Z

400

NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect (OSTI)

Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

GREEN,T.ET AL.

2003-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Management and Performance NASA'S APPROACH TO PERFORMANCE MANAGEMENT  

E-Print Network [OSTI]

TO PERFORMANCE MANAGEMENT conduct the Agency's day-to-day work. Figure 1 depicts NASA's organizational structureManagement and Performance NASA'S APPROACH TO PERFORMANCE MANAGEMENT NASA's FY 2015 Management as an organization and NASA's approach to performance management, strategic planning, and performance reporting

Waliser, Duane E.

402

DOE Strategic Human Capital Plan (FY 2011 - 2015) | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orAChiefAppropriation FYGStrategic Human Capital Plan (FY

403

Final Report and Strategic Plan on the Feasibility Study to Assess Geothermal Potential on Warm Springs Reservation Lands. Report No. DOE/GO/15177  

SciTech Connect (OSTI)

In 2005 the Confederated Tribes of Warm Springs Tribal Council authorized an evaluation of the geothermal development potential on the Confederated Tribes of Warm Springs Reservation of Oregon. Warm Springs Power & Water Enterprises obtained a grant from the U.S. Department of Energy to conduct a geological assessment and development estimate. Warm Springs Power & Water Enterprises utilized a team of expert consultants to conduct the study and develop a strategic plan. The resource assessment work was completed in 2006 by GeothermEx Inc., a consulting company specializing in geothermal resource assessments worldwide. The GeothermEx report indicates there is a 90% probability that a commercial geothermal resource exists on tribal lands in the Mt. Jefferson area. The geothermal resource assessment and other cost, risk and constraints information has been incorporated into the strategic plan.

James Manion, Warm Springs Power & Water Enterprises; David McClain, McClain & Associates

2007-05-17T23:59:59.000Z

404

Growing Green As part of its strategic plan to foster growth and development in key  

E-Print Network [OSTI]

reconstruction, nuclear waste containment and disposal, and photochemical deconstruction of pollutants Key remediation technologies for hazardous industrial pollutants in soil and groundwater · Geotechnical Research contamination and remediation, and management of mine wastes For more information, please visit: www.uwo.ca/enviro

Denham, Graham

405

WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect (OSTI)

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and implementing prescribed burns and fuel reduction projects in the Upton Reserve. Prescribed fire and fuel reduction in locations outside the Upton Reserve will be coordinated through the Natural Resource Management Program at BNL, and done in consultation with FWS. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by FWS, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel.

ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

2003-09-01T23:59:59.000Z

406

Risk Management Plan Electron Beam Ion Source Project  

E-Print Network [OSTI]

Risk Management Plan for the Electron Beam Ion Source Project (EBIS) Project # 06-SC-002 at Brookhaven National Laboratory Upton, NY For the U.S. Department of Energy Office of Science Office of Nuclear Physics (SC ­ 26) #12;1. Background and References 1.1 Background The EBIS Project will manage

407

RISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING  

E-Print Network [OSTI]

: 814-863-9958. Fax: 814-865-7846. In the pharmaceutical industry, the optimal management of the newRISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING Michael J. Rogers, Anshuman incorporate a Monte Carlo simulation procedure to a stochastic optimization model (OptFolio) of pharmaceutical

Maranas, Costas

408

USDA / NRCS Waste Utilization Standard and Management Plans  

E-Print Network [OSTI]

)Waste Utilization Standard (633) Purposes Protect water quality. Provide fertility for crop, forageUSDA / NRCS Waste Utilization Standard and Management Plans Revised 7/05 Rick Leopold USDA / NRCS Bryan, TX #12;OutlineOutline Interactions with Nutrient Management Standard (590) Waste Utilization

Mukhtar, Saqib

409

Institutional Plan FY 2003 - 2007  

SciTech Connect (OSTI)

The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the Laboratory Scientific Vision and operations goals. The Initiatives section describes some of the specific new research programs representing major long-term opportunities for the Department of Energy and Berkeley Lab. The Operations Strategic Planning section describes our strategic thinking in the areas of human resources; site and cyber security; workforce diversity; communications and trust; integrated safety management; and technology transfer activities. The Infrastructure Strategic Planning section describes Berkeley Lab's facilities planning process and our site and facility needs. The Summary of Major Issues section provides context for discussions at the Institutional Planning On-Site Review. The Resource Projections are estimates of required budgetary authority for Berkeley Lab's research programs.

Chartock, Michael; Hansen, Todd

2003-01-27T23:59:59.000Z

410

Wildland Fire Management Plan for Brookhaven National Laboratory  

SciTech Connect (OSTI)

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.

Green,T.

2009-10-23T23:59:59.000Z

411

State Lands Management Plan Rosemary Hill Observatory  

E-Print Network [OSTI]

resources . . . . . . . . . 21. Plans for Non-renewable Natural and Cultural Resources . . . . 22 and Improvements . . . . . . . . . 4. Proximity to Significant Public Resources . . . . . . . . . . . 5 RESOURCES . . . . . . . . . . . . . . 8. Resources Listed in the Florida Natural Areas Inventory . . . . 9

Slatton, Clint

412

2011-2015 Human Capital Management Plan  

Broader source: Energy.gov (indexed) [DOE]

to the American people. This (HCMP or Plan) shows how we intend to recruit, hire, train, develop, and retain such employees. Our differs from previous versions not only in...

413

Task 7.1 - Strategic Planning: Semi-annual report, July 1- December 31, 1996.  

SciTech Connect (OSTI)

As directed by the EERC senior management, activities during the reporting period have focused on research in support of the development of a series of white papers dealing with the status and future direction of select areas of environmental policy. These areas include (1) brownfields, (2) onshore solid waste management, (3) water related policy, (4) climate change, (5) nuclear facility cleanup and waste disposition, and (6) air emissions. Each white paper is designed to consist of two parts: (1) a summary of status and future directions and (2) an evaluation of a select group of key issues. The EERC believes that energy and environmental issues are inseparable and the environmental policy evaluations are considered to be a continuation of the activities begun at the EERC in 1989 focused on the assessment of trends and policies affecting energy industries. The conclusions reached are our own, based on a broad list of sources with certain findings attributed by reference.

Daly, D.J.

1997-12-31T23:59:59.000Z

414

Configuration Management Plan for Tank Farm Restoration and Safe Operations Project W-314 [CANCELLED  

SciTech Connect (OSTI)

The W-314 configuration management (CM) plan describes the systems, processes and procedures for implementing CM.

MCGREW, D.L.

2001-01-12T23:59:59.000Z

415

SECTION 10 Table of Contents 10 Coeur d' Alene Subbasin Management Plan ...............................................2  

E-Print Network [OSTI]

and formation of the Subbasin Work Teams and the process used to develop and adopt the management plan can10-1 SECTION 10 ­ Table of Contents 10 Coeur d' Alene Subbasin Management Plan....................................................................................................................35 #12;10-2 10 Coeur d' Alene Subbasin Management Plan The Coeur d' Alene Subbasin Management Plan

416

SECTION 26 Table of Contents 26 Spokane Subbasin Management Plan .........................................................2  

E-Print Network [OSTI]

Work Teams and the process used to develop and adopt the management plan can be found in Section 126-1 SECTION 26 ­ Table of Contents 26 Spokane Subbasin Management Plan .........................................................................27 #12;26-2 26 Spokane Subbasin Management Plan The Spokane Subbasin Management Plan was developed

417

SECTION 18 Table of Contents 18 Pend Oreille Subbasin Management Plan....................................................2  

E-Print Network [OSTI]

of the Subbasin Work Teams and the process used to develop and adopt the management plan can be found in Section 118-1 SECTION 18 ­ Table of Contents 18 Pend Oreille Subbasin Management Plan;18-2 18 Pend Oreille Subbasin Management Plan The Pend Oreille Subbasin Management Plan was developed

418

SECTION 50 Table of Contents 50 Lake Rufus Woods Management Plan .........................................................2  

E-Print Network [OSTI]

and formation of the Subbasin Work Teams and the process used to develop and adopt the management plan can50-1 SECTION 50 ­ Table of Contents 50 Lake Rufus Woods Management Plan .........................................................................28 #12;50-2 50 Lake Rufus Woods Management Plan The Lake Rufus Woods Subbasin Management Plan

419

SECTION 34 Table of Contents 34 Upper Columbia Management Plan..............................................................2  

E-Print Network [OSTI]

and formation of the Subbasin Work Teams and the process used to develop and adopt the management plan can34-1 SECTION 34 ­ Table of Contents 34 Upper Columbia Management Plan .........................................................................25 #12;34-2 34 Upper Columbia Management Plan The Upper Columbia Subbasin Management Plan

420

SECTION 42 Table of Contents 42 San Poil Subbasin Management Plan ..........................................................2  

E-Print Network [OSTI]

of the Subbasin Work Teams and the process used to develop and adopt the management plan can be found in Section 142-1 SECTION 42 ­ Table of Contents 42 San Poil Subbasin Management Plan .........................................................................22 #12;42-2 42 San Poil Subbasin Management Plan The San Poil Subbasin Management Plan was developed

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

E-Print Network 3.0 - adaptive management plan Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

results for: adaptive management plan Page: << < 1 2 3 4 5 > >> 1 Regional Water Management: Adapting to Uncertain Water Summary: & Implement Management Options Monitor &...

422

University Services Management Services  

E-Print Network [OSTI]

system U Services Finance organized a workforce planning process resulting in a team with better capacity > 3 Primary Services Human Resources Workforce Planning Recruitment and Selection Employee and Labor, and strategic planning efforts. In addition to supporting the University Services enterprise, the Management

Webb, Peter

423

Project Management Plan (PMP) for International Atomic Energy Agency (IAEA) Safeguards Project  

SciTech Connect (OSTI)

This plan presents the overall objectives, description, justification and planning for the PFP IAEA project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP) HNF-3617 Rev 0.

BARTLETT, W.D.

1999-09-14T23:59:59.000Z

424

Oak Ridge National Lebroatory Liquid&Gaseous Waste Treatment System Strategic Plan  

SciTech Connect (OSTI)

Excellence in Laboratory operations is one of the three key goals of the Oak Ridge National Laboratory (ORNL) Agenda. That goal will be met through comprehensive upgrades of facilities and operational approaches over the next few years. Many of ORNL's physical facilities, including the liquid and gaseous waste collection and treatment systems, are quite old, and are reaching the end of their safe operating life. The condition of research facilities and supporting infrastructure, including the waste handling facilities, is a key environmental, safety and health (ES&H) concern. The existing infrastructure will add considerably to the overhead costs of research due to increased maintenance and operating costs as these facilities continue to age. The Liquid Gaseous Waste Treatment System (LGWTS) Reengineering Project is a UT-Battelle, LLC (UT-B) Operations Improvement Program (OIP) project that was undertaken to develop a plan for upgrading the ORNL liquid and gaseous waste systems to support ORNL's research mission.

Van Hoesen, S.D.

2003-09-09T23:59:59.000Z

425

Strategic Energy Planning (Area 1) Consultants Reports to Citizen Potawatomi Nation Federally Recognized Indian Tribe  

SciTech Connect (OSTI)

The assets that Citizen Potawatomi Nation holds were evaluated to help define the strengths and weaknesses to be used in pursuing economic prosperity. With this baseline assessment, a Planning Team will create a vision for the tribe to integrate into long-term energy and business strategies. Identification of energy efficiency devices, systems and technologies was made, and an estimation of cost benefits of the more promising ideas is submitted for possible inclusion into the final energy plan. Multiple energy resources and sources were identified and their attributes were assessed to determine the appropriateness of each. Methods of saving energy were evaluated and reported on and potential revenue-generating sources that specifically fit the tribe were identified and reported. A primary goal is to create long-term energy strategies to explore development of tribal utility options and analyze renewable energy and energy efficiency options. Associated goals are to consider exploring energy efficiency and renewable economic development projects involving the following topics: (1) Home-scale projects may include construction of a home with energy efficiency or renewable energy features and retrofitting an existing home to add energy efficiency or renewable energy features. (2) Community-scale projects may include medium to large scale energy efficiency building construction, retrofit project, or installation of community renewable energy systems. (3) Small business development may include the creation of a tribal enterprise that would manufacture and distribute solar and wind powered equipment for ranches and farms or create a contracting business to include energy efficiency and renewable retrofits such as geothermal heat pumps. (4) Commercial-scale energy projects may include at a larger scale, the formation of a tribal utility formed to sell power to the commercial grid, or to transmit and distribute power throughout the tribal community, or hydrogen production, and propane and natural-gas distribution systems.

Smith, Marvin; Bose, James; Beier, Richard; Chang, Young Bae

2004-12-01T23:59:59.000Z

426

airborne strategic conflict: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

delighted to present you with our University's Strategic Plan for 2009-2013. During the past year.This Strategic Plan,in short,is a Plan for and by our entire University. The...

427

Strategic plan for the utilization of remote sensing technologies in the environmental restoration program  

SciTech Connect (OSTI)

The objectives of the Environmental Restoration (ER) Remote Sensing and Special Surveys Program are to apply state-of-the-art remote sensing and geophysical technologies and to manage routine and remotely-sensed examinations of the Oak Ridge Reservation (ORR), the Paducah Gaseous Diffusion Plant (PGDP), the Portsmouth Gaseous Diffusion Plant (PORTS), and their adjacent off-site areas. Repeated multispectral scanner (MSS) imagery, gamma, and photographic surveys will allow monitoring of the degradation that might occur in waste containment vessels and monitoring (at a later stage in the remediation life cycle) of improvements from restoration efforts and cleanup. These technologies, in combination with geophysical surveys, will provide an effective means for identifying unknown waste sites and contaminant transport pathways. All of the data will be maintained in a data base that will be accessible to site managers in the ER Program. The complete analysis of collected data will provide site-specific data to the ER Program for characterizing and monitoring ER Program hazardous waste sites.

King, A.D.; Doll, W.E.; Durfee, R.C.; Luxmoore, R.J.; Conder, S.R.; Nyquist, J.E.

1993-12-01T23:59:59.000Z

428

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network [OSTI]

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Park-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Park Management ­ Bachelor of Science [EH

Sheridan, Scott

429

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network [OSTI]

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Recreation-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Recreation Management ­ Bachelor

Sheridan, Scott

430

Project management plan for Project W-320, Tank 241-C-106 sluicing  

SciTech Connect (OSTI)

This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987).

Phillips, D.R.

1994-12-01T23:59:59.000Z

431

Management and Performance PERFORMANCE REPORTING AND PLANNING  

E-Print Network [OSTI]

2015 Performance Plan, starting with the currently reported year of FY 2013 and spanning backward from FY 2008 to FY 2012, go to http://www.nasa.gov/about/budget/PAR_Reports.html. The combined report 2014 and/or FY 2015. The performance goal summary is followed by: · The annual performance indicators

Waliser, Duane E.

432

Disruption Management ( Operations Research between planning ...  

E-Print Network [OSTI]

In ship-building , production plans usually allo w some fl exibility. ... creasing the cost of production gives rise to an increased demand for robustness in ..... H o w ever , from the passenger side it is the w orst option , since a group of customers.

433

Oak Ridge National Laboratory Waste Management Plan. Revision 1  

SciTech Connect (OSTI)

The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

Not Available

1991-12-01T23:59:59.000Z

434

Strategic planning -- task 7.1. Topical report, February 1994--June 1995  

SciTech Connect (OSTI)

The nations of East Central Europe regained their political and economic freedom in 1989, ending nearly a half century of centrally planned economies under the hegemony of the former Soviet Union (FSU). These nations are now emerging from economic conditions marked by price distortions and a focus on heavy industry, isolation from world markets, and a lack of occupational health and environmental safeguards. Economic recovery, environmental restoration, and political stability, as well as eventual entrance into the European Community (EC), require a reordering of policies and priorities, including those bearing on energy and the environment. This report, prepared as a background document for the Second International Conference on Energy and Environment to be held in Prague in November 1994, is composed of a summary table and supporting text and is intended to provide a concise review of issues related to energy and the environment for the Czech and Slovak Republics, Hungary, Poland, and Bulgaria. Organized by subject and country, Table 1 contains country profiles (Row A), information on the economy (Row B), primary energy consumption, environmental priorities, energy resources, production, and utilization (Rows C, D, F, G, H, and 1), electrical generation and transmission (Rows J and K), district heating (Row L), briquettes (Row M), and environmental regulations (Row N). Pertinent policy goals, issues, and trends are noted. The reports is based largely on a review of documents published by the International Energy Agency (IEA) and the U.S. Department of Energy (DOE), as well as selected sources obtained from the countries of the region. Reference citations are keyed to information presented in Table 1.

Daly, D.J.

1996-01-01T23:59:59.000Z

435

Community Energy Stategic Planning Resources  

Broader source: Energy.gov (indexed) [DOE]

Community Energy Strategic Planning Resources Technical Assistance Program January 24 th , 2013 2 Agenda 1. Welcome & overview 2. What is a community energy strategic plan and why...

436

MA - Office of Management - Energy Conservation Plan  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |EnergyonSupport0.pdf5 OPAM SEMIANNUAL REPORTMA Energy Conservation Plan January 2010 1 Office

437

ORNL long-range environmental and waste management plan  

SciTech Connect (OSTI)

This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

1989-09-01T23:59:59.000Z

438

Energy Efficiency Improvement and Cost Saving Opportunities for the U.S. Iron and Steel Industry An ENERGY STAR(R) Guide for Energy and Plant Managers  

E-Print Network [OSTI]

actions, develop an energy management plan for business; andFigure 8-1. Main elements of a strategic energy managementCaffal, C. (1995). Energy Management in Industry. Centre for

Worrell, Ernst

2011-01-01T23:59:59.000Z

439

CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect (OSTI)

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

DAVIS, M.

2005-04-01T23:59:59.000Z

440

Production Frontier Methodologies and Efficiency as a Performance Measure in Strategic Management Research  

E-Print Network [OSTI]

Total quality management implementation and competitive advantage: the role of structural control and

Chen, Chien-Ming; Delmas, Magali A.; Lieberman, Marvin B.

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

System integration test plan for HANDI 2000 business management system  

SciTech Connect (OSTI)

This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

Wilson, D.

1998-08-24T23:59:59.000Z

442

California Groundwater Management Plans | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: EnergyBoston Areais3: Crystalline RockCaldera2California EndangeredCodePlans

443

Technical assistance contractor Management Plan. Final [report  

SciTech Connect (OSTI)

The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

Not Available

1993-09-01T23:59:59.000Z

444

Suggested Elements for a Data Management Plan | U.S. DOE Office...  

Office of Science (SC) Website

management of the research data including plans to reevaluate the costs and benefits of data sharing and preservation. Protection. A statement of plans, where appropriate and...

445

Integrated safeguards and security management plan  

SciTech Connect (OSTI)

Berkeley Lab is committed to scientific excellence and stewardship of its assets. While security principles apply to all work performed at the Laboratory, their implementation is flexible. Berkeley Lab adheres to the following principles: Line management owns security; Security roles and responsibilities are clearly defined and communicated; Security functions are integrated; An open environment supports the Laboratory's Mission; The security program must support the scientific and operational missions of the Laboratory and must be value added; and Security controls are tailored to individual and facility requirements.

Bowen, Sue, editor

2001-04-16T23:59:59.000Z

446

Environmental restoration and remediation technical data management plan  

SciTech Connect (OSTI)

The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit.

Key, K.T.; Fox, R.D.

1994-02-01T23:59:59.000Z

447

DOE & Strategic Sourcing "New Challenges, New Opportunities"  

Broader source: Energy.gov (indexed) [DOE]

& Strategic Sourcing "New Challenges, New Opportunities" What is it? NNSA Model DOE Future Activities Bill Marks, Commodity Manager, NNSA Supply Chain Management Center Gary...

448

Information Technology Strategic Plan  

E-Print Network [OSTI]

;Applications Staci Allen Walter Arnett Terrielyn Ashley Steve Bainer John Baston Lisa Beard Barry Blakely Koula Broaddus Rob Canales Lana Cole Natalie Collett Teena Collins Chuck Combes Marilyn Cone Gary Coutts UK Kumar Debbie Kyle Carl Maggard Donna Manning Donna Miller Doris Miller Blake Mills Tommie Minnick Alan

Hayes, Jane E.

449

2013 2017 Strategic Plan  

E-Print Network [OSTI]

with the government and all stakeholders to create the conditions for success. UCC has been shaping minds and shaping

Schellekens, Michel P.

450

Strategic plan 1994  

SciTech Connect (OSTI)

Sandia National Laboratories faces institutional challenges that are unique in its history. Never before have the national laboratories been viewed so critically, and never before has their role been the subject of such study and debate. At the same time, the opporunities to render `exceptional service in the national interest` have never been greater. The business of Sandia today and into the foreseeable future will rely on a strong, integrated technical foundation, represented most fundamentally by its core competencies. While is is impossible to foresee precisely what missions Sandia will pursue many years from now, one thing is clear: Central to its service to the nation will be the application of science-based engineering skills to the stewardship of the nuclear weapons stockpile. Whether on not the nation ever builds a new nuclear weapon, those that remain in stockpile will require continuous stewardship based on the integration of scientific understanding with experienced systems engineering. Sandia`s steadfast commitment to DOE`s stockpile stewardship mission will also be evident in the production of limited numbers of certain vital weapon components as the weapons production complex is realigned. Complementing this enduring responsibility will be expanded missions in energy, environment, and economic competitiveness. The work for other federal agencies will be jointly sponsored under high-level agreements with DOE. Multi-institutional teams will become a common way of doing business. The multiprogram laboratory model will evolve toward a new model of multi-laboratory programs addressing major national needs. Sandia will be a distinct and important component of an integrated system of national laboratories.

Not Available

1995-03-01T23:59:59.000Z

451

SFU SUSTAINABILITY STRATEGIC PLAN  

E-Print Network [OSTI]

a priority in the early 1980s, and recycling was begun in the early 1990s in response to lobbying it became a signatory to the Talloires Declaration. The Policy articulates two principles that led directly them." In 2012, these fundamental commitments led to the creation of a new Senior Sustainability

452

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

Bartridge Judy Grau Mark Hesters Don Kondoleon Chuck Najarian Principal Authors Grace Anderson Clare Please use the following citation for this report: Bartridge, James, Judy Grau, Mark Hesters, Don

453

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

Smith, Advisor James Bartridge Judy Grau Mark Hesters Don Kondoleon Clare Laufenberg Gallardo James Mc

454

Report: EM Strategic Planning  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015Department of Energy onACQUISITION ANDEMEM

455

Report: Strategic Planning Impacts  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015Department of Energy onACQUISITIONReport:SMALL

456

2004 Strategic Plan  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment( Sample of Shipment Notice)1021STATE ENERGY3 Commercial andof4U.S.

457

2007 Strategic Plan  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment( Sample of Shipment Notice)1021STATE6 DRAFTResearch: Requirementof

458

Strategic Planning 2004 - 2008  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 10 MECS Survey Data9c : U.S.

459

BNL | CFN Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program CumulusA t iBudget2/4/13 Page 1 of 2BNLBusiness of

460

BNL | CFN Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program CumulusA t iBudget2/4/13 Page 1 of 2BNLBusiness

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

BNL | CFN Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6 M. Babzien, I. Ben-Zvi, P. Catravas, J. M. Fang,

462

Berkeley Lab Strategic Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScienceCareers Apply for a Job ExternalBerkeley Lab |Directorate -

463

Hanford Site waste management and environmental restoration integration plan  

SciTech Connect (OSTI)

The Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs.

Merrick, D.L.

1990-04-30T23:59:59.000Z

464

National Ignition Facility Cryogenic Target Systems Interim Management Plan  

SciTech Connect (OSTI)

Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety & Health (ES&H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for delivering this system will be decided at the national level, based on experiment campaign requirement dates that will be derived through this process. The current milestone date for achieving indirect-drive ignition on the NIF is December 2010. Maintaining this milestone requires that the cryogenic systems be complete and available for fielding experiments early enough that the planned experimental campaigns leading up to ignition can be carried out. The capability of performing non-ignition cryogenic experiments is currently required by March 2006, when the NIF's first cluster of beams is operational. Plans for cryogenic and non-cryogenic experiments on the NIF are contained in NNSA's Campaign 10 Program Plans for Ignition (MTE 10.1) and High Energy Density Sciences (MTE 10.2). As described in this document, the NCTS Program Manager is responsible for managing NIF Cryogenic Target Systems development, engineering, and deployment. Through the NIF Director, the NCTS Program Manager will put in place an appropriate Program Execution Plan (draft attached) at a later time consistent with the maturing and funding these efforts. The PEP will describe management methods for carrying out these activities.

Warner, B

2002-04-25T23:59:59.000Z

465

Safety and quality management and administration Fiscal Year 1995 site support program plan WBS 6.7.2.6  

SciTech Connect (OSTI)

The mission of the Emergency, Safety, and Quality Services (ESQ) management and Program Integration is to provide leadership for the ESQ Department, coordinate business management activities of the ESQ department, and the programs it supports, as well as to plan organize, direct, and control other activities that require department-wide coordination. Primary activities include providing strategic and business planning and reporting support to ESQ management; developing and documenting ESQ management systems and procedures; coordinating ESQ`s self-assessment and Award Fee self evaluation efforts; coordinating the ESQ departments`s communication, total quality, cost savings, and productivity efforts; and tracking ESQ commitments and staffing data. This program element also provides program direction and performance assessment for the ESH&Q division of ICF KH. The ESH&Q Division educates ICF KH management and employees to protect personnel and the environment; identifies, interprets and inspects to requirements; provides administrative and field support; performs final acceptance of construction; assesses effectiveness of ICF KH programs and processes, and performs baseline ESH&Q assessments.

Hagan, J.W.

1994-09-01T23:59:59.000Z

466

Native American Initiative Short Course Management Plan  

SciTech Connect (OSTI)

A training program is outlined for members of Native American tribes having an interest in working in the oil and gas industry. Also, the program will assist tribes whose lands have oil and gas resources to become more familiar with the industry and technology necessary to develop their resources. The proposed program will contribute to meeting the goals of the U.S. Department of Energy's (DOE) Domestic Oil and Gas Initiative to help Native American tribes become more self-sufficient in developing and managing their resources through training in cost-effective, improved technologies for hydrocarbon production that will meet environmental regulations. The training program outlined is for adult tribal representatives who are responsible for managing tribal mineral holdings or setting policy, or who work in the oil and gas industry. The course content is in response to a survey that was developed by BDM-Oklahoma and sent in the spring of 1995 to 26 tribes or tribal agencies which were identified through previous contact with DOE. Tribes were asked to indicate course content needs, levels, preferred time of year, and location. Six tribes responded with specific recommendations and needs. These tribes include the Osage, Creek, Pueblo, Cherokee, St. Regis Mohawk, Northern Arapaho, and Ute Mountain Ute. The results of the survey are included in a table.The training will be conducted at various locations by BDM-Oklahoma technical staff, which , includes geologists, exploration and drilling specialists, oil and gas production specialists, environmental policy specialists, and contract specialists. The proposed training schedule offers three workshops per year and includes those courses identified in the survey by the tribes. The schedule initially proposed in April 1995 has been modified in order to offer training identified by the tribes in the most cost-effective manner. Participants will be able to take two courses, and travel costs will be minimized. A schedule is included in Table 2-1. Contracts have been initiated with several tribes to schedule a training workshop at various tribal locations. Currently, discussions are underway with the Hopi, Ute, Apache, and Osage tribes. Each of the tribal leaders are presenting the training program to their respective councils. The training offered will be a continuation of the workshop started in October, 1996. Modifications to the course content will be integrated into the presentations to meet specific tribal needs. These special technology needs will be identified through discussions with tribal leaders and council members.

Carroll, H.B.

1999-04-27T23:59:59.000Z

467

Nutrient Management Educational & Planning Resources The Pennsylvania Nutrient Management Education Program provides a wide array of resources  

E-Print Network [OSTI]

v.08.2011 Nutrient Management Educational & Planning Resources The Pennsylvania Nutrient Management Education Program provides a wide array of resources to nutrient management specialists. These resources serve two purposes: Education. These factsheets and publications are selected to supplement

Guiltinan, Mark

468

Data for Planning and Evaluation DEPARTMENT =150201 Parks Recreation and Tourism Management  

E-Print Network [OSTI]

Data for Planning and Evaluation DEPARTMENT =150201 Parks Recreation and Tourism Management Degrees N 103 79 89 111 13 #12;DEPARTMENT =150201 Parks Recreation and Tourism Management State

469

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network [OSTI]

in a strategic energy management program are depicted inof a strategic energy management program A successful

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

470

SAPHIRE 8 Software Configuration Management Plan  

SciTech Connect (OSTI)

The INL software developers use version control for both the formally released SAPHIRE versions, as well as for source code. For each formal release of the software, the developers perform an acceptance test: the software must pass a suite of automated tests prior to official release. Each official release of SAPHIRE is assigned a unique version identifier. The release is bundled into a standard installation package for easy and consistent set-up by individual users. Included in the release is a list of bug fixes and new features for the current release, as well as a history of those items for past releases. Each formal release of SAPHIRE will have passed an acceptance test. In addition to assignment of a unique version identifier for an official software release, each source code file is kept in a controlled library. Source code is a collection of all the computer instructions written by developers to create the finished product. The library is kept on a server, where back-ups are regularly made. This document describes the configuration management approach used as part of the SAPHIRE development.

Curtis Smith

2010-01-01T23:59:59.000Z

471

Rainwater Wildlife Area Management Plan : Executive Summary.  

SciTech Connect (OSTI)

The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Northwest Power Act directs the NPPC to develop a program to ''protect, mitigate, and enhance'' fish and wildlife of the Columbia River and its tributaries. The overarching goals include: A Columbia River ecosystem that sustains an abundant, productive, and diverse community of fish and wildlife; Mitigation across the basin for the adverse effects to fish and wildlife caused by the development and operation of the hydrosystem; Sufficient populations of fish and wildlife for abundant opportunities for tribal trust and treaty right harvest and for non-tribal harvest; and Recovery of the fish and wildlife affected by the development and operation of the hydrosystem that are listed under the Endangered Species Act.

Childs, Allen B.; Confederated Tribes of the Umatilla Indian Reservation in Oregon.

2002-02-01T23:59:59.000Z

472

Waste Isolation Pilot Plant land management plan  

SciTech Connect (OSTI)

On October 30, 1992, the WIPP Land Withdrawal Act became law. This Act transferred the responsibility for the management of the WIPP Land Withdrawal Area (WILWA) from the Secretary of the Interior to the Secretary of Energy. In accordance with sections 3(a)(1) and (3) of the Act, these lands {open_quotes}{hor_ellipsis}are withdrawn from all forms of entry, appropriation, and disposal under the public land laws{hor_ellipsis}{close_quotes}and are reserved for the use of the Secretary of Energy {open_quotes}{hor_ellipsis}for the construction, experimentation, operation, repair and maintenance, disposal, shutdown, monitoring, decommissioning, and other activities, associated with the purposes of WIPP as set forth in the Department of Energy National Security and Military Applications of Nuclear Energy Act of 1980 and this Act.{close_quotes}. As a complement to this LMP, a MOU has been executed between the DOE and the BLM, as required by section 4(d) of the Act. The state of New Mexico was consulted in the development of the MOU and the associated Statement of Work (SOW).

NONE

1996-05-01T23:59:59.000Z

473

Fluid management plan for the Project Shoal Area Offsites Subproject  

SciTech Connect (OSTI)

The US Department of Energy, Nevada Operations Office (DOE/NV) has initiated the Offsites Subproject to characterize the hazards posed to human health and the environment as a result of underground nuclear testing activities at facilities other than the Nevada Test Site (NTS). A primary Subproject objective is to gather adequate data to characterize the various Subproject sites through the collection of surface and subsurface soil samples and by drilling several wells for the collection of groundwater data. The Project Shoal Area (PSA) is one of the Subproject`s Nevada sites and is subject to the requirements set forth in the Federal Facility Compliance Agreement and Consent Order (FFACO) (DOE, 1996a). In accordance with the FFACO, a Corrective Action Investigation Plan (CAIP) has been developed for work at the PSA (designated as Corrective Action Unit Number 416). This Fluid Management Plan (FMP) provides guidance for the management of fluids generated from wells constructed at the PSA. Long-term monitoring and future activities at the site, if required, will be set forth in additional documents as required by the FFACO. The ultimate method for disposition of fluids generated by site operations depends upon sample analysis and process knowledge in relation to fluid management criteria. Section 2 describes well site operations; Section 3 discusses fluid management criteria; Section 4 includes the fluid monitoring program; Section 5 presents the fluid management strategy; Section 6 provides for fluid management during routine well monitoring; and Section 7 contains reporting criteria.

NONE

1996-08-01T23:59:59.000Z

474

Long-range master plan for defense transuranic waste management  

SciTech Connect (OSTI)

The Long Range Master Plan for the Defense Transuranic Waste Program (DTWP), or ''Master Plan,'' details current TRU waste management plans and serves as a framework for the DTWP. Not all final decisions concerning activities presented in the Master Plan have been made (e.g., land withdrawal legislation, the WIPP Compliance and Operational Plan and the TRUPACT Certificate of Compliance). It is the goal of the DTWP to end interim storage and achieve permanent disposal of TRU waste. To accomplish this goal, as much TRU waste as possible will be certified to meet the WIPP Acceptance Criteria (WAC). The certified waste will then be disposed of at WIPP. The small quantity of waste which is not practical to certify will be disposed of via alternative methods that require DOE Headquarters approval and shall comply with the National Environmental Policy Act requirements and EPA/State Regulations. The definition of TRU waste is ''without regard to source or form, waste that is contaminated with alpha-emitting transuranium radionuclides with half-lives greater than 20 years and concentrations greater than 100 nanocuries/gram (nCi/g) at the time of assay. Heads of Field Elements can determine that other alpha contaminated wastes, peculiar to a specific site, must be managed as transuranic waste.''

Not Available

1988-12-01T23:59:59.000Z

475

NYPA, Entergy begin nuclear management services plan  

SciTech Connect (OSTI)

The New York Power Authority (NYPA) and Entergy Corp. of New Orleans, La., announced recently the signing of a memorandum of understanding as a step toward a contract for Entergy to provide management services to NYPA`s two nuclear power plants. The agreement is the first of its kind. NYPA is the nation`s largest state-owned electric utility and supplier of one-quarter of New York`s electricity. Its nuclear plants are Indian Point 3 (IP3) in Buchanan, Westchester County, and James A. FitzPatrick in Scriba, Oswego County. Entergy is a utility holding company and its subsidiary, Entergy Operations Inc., is widely recognized as one of the leading nuclear operators in the United States. {open_quotes}NYPA`s nuclear plants are assets that belong to the people of New York,{close_quotes} said C.D. {open_quotes}Rapp{close_quotes} Rappleyea, NYPA`s chairman and CEO. {open_quotes}Our alliance with Entergy can provide the people of this state with added assurance that these plants will operate with the highest level of safety and efficiency.{close_quotes} FitzPatrick, an 800 MW boiling water reactor, has operated since 1975 and IP3, a 980 MW pressurized water reactor, since 1976. Although both are currently running well, they have had problems in recent years, and IP3 is on the US Nuclear Regulatory Commission`s (NRC) list of plants requiring increased regulatory attention. Entergy operated both types of reactors, has three single-unit sites like NYPA`s and is experienced in operating plants for different utility owners.

NONE

1996-10-01T23:59:59.000Z

476

Advanced Hybrid Particulate Collector Project Management Plan  

SciTech Connect (OSTI)

As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

Miller, S.J.

1995-11-01T23:59:59.000Z

477

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

SciTech Connect (OSTI)

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

478

SPORT MANAGEMENT, RECREATION, AND TOURISM TOURISM, LEISURE, AND EVENT PLANNING (TLEP) MAJOR  

E-Print Network [OSTI]

1 SPORT MANAGEMENT, RECREATION, AND TOURISM DIVISION TOURISM, LEISURE, AND EVENT PLANNING (TLEP...................................................................................................................23 Examples of Tourism Field Experie

Moore, Paul A.

479

U.S. Department of Energy 2012 Strategic Sustainability Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

U.S. Department of Energy 2012 Strategic Sustainability Performance Plan U.S. Department of Energy 2012 Strategic Sustainability Performance Plan This document details the U.S....

480

2011 U.S. Department of Energy Strategic Sustainability Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1 U.S. Department of Energy Strategic Sustainability Performance Plan 2011 U.S. Department of Energy Strategic Sustainability Performance Plan 2011 U.S. Department of Energy...

Note: This page contains sample records for the topic "management strategic plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

2010 U.S. Department of Energy Strategic Sustainability Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2010 U.S. Department of Energy Strategic Sustainability Performance Plan 2010 U.S. Department of Energy Strategic Sustainability Performance Plan 2010 U.S. Department of Energy...

482

Case study: strategic planning process used by the Texas A&M University Career Center when creating technology initiative project  

E-Print Network [OSTI]

FIGURE Page 1 SWOT Analysis Model ............................................................................... 21 2 Strategic Change Cycle ............................................................................... 22... Mountain Association of Colleges and Employers (RMACE) - This is a regional branch of the national organization designed to assist employers and colleges with the job search process. SWOT- Strengths, Weaknesses, Opportunities and Threats (Robbins...

Vermillion, Mary Gail

2005-02-17T23:59:59.000Z

483

Resource management plan for the Oak Ridge Reservation  

SciTech Connect (OSTI)

A plan for management of the wildlife resources on the US Department of Energy's Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory's Environmental Sciences Division.

Parr, P.D. (Oak Ridge National Lab., TN (United States)); Evans, J.W. (Tennessee Wildlife Resources Agency, Knoxville, TN (United States))

1992-06-01T23:59:59.000Z

484

Argonne National Laboratory institutional plan FY 2001--FY 2006.  

SciTech Connect (OSTI)

This Institutional Plan describes what Argonne management regards as the optimal future development of Laboratory activities. The document outlines the development of both research programs and support operations in the context of the nation's R and D priorities, the missions of the Department of Energy (DOE) and Argonne, and expected resource constraints. The Draft Institutional Plan is the product of many discussions between DOE and Argonne program managers, and it also reflects programmatic priorities developed during Argonne's summer strategic planning process. That process serves additionally to identify new areas of strategic value to DOE and Argonne, to which Laboratory Directed Research and Development funds may be applied. The Draft Plan is provided to the Department before Argonne's On-Site Review. Issuance of the final Institutional Plan in the fall, after further comment and discussion, marks the culmination of the Laboratory's annual planning cycle. Chapter II of this Institutional Plan describes Argonne's missions and roles within the DOE laboratory system, its underlying core competencies in science and technology, and six broad planning objectives whose achievement is considered critical to the future of the Laboratory. Chapter III presents the Laboratory's ''Science and Technology Strategic Plan,'' which summarizes key features of the external environment, presents Argonne's vision, and describes how Argonne's strategic goals and objectives support DOE's four business lines. The balance of Chapter III comprises strategic plans for 23 areas of science and technology at Argonne, grouped according to the four DOE business lines. The Laboratory's 14 major initiatives, presented in Chapter IV, propose important advances in key areas of fundamental science and technology development. The ''Operations and Infrastructure Strategic Plan'' in Chapter V includes strategic plans for human resources; environmental protection, safety, and health; site and facilities; security, export control, and counterintelligence; information management; communications, outreach, and community affairs; performance-based management; and productivity improvement and overhead cost reduction. Finally, Chapter VI provides resource projections that are a reasonable baseline for planning the Laboratory's future.

Beggs, S.D.

2000-12-07T23:59:59.000Z

485

Plan for Quality Management 2007-2010 THE UNIVERSITY OF GOTHENBURG  

E-Print Network [OSTI]

Plan for Quality Management 2007-2010 THE UNIVERSITY OF GOTHENBURG Contents Preface 4 Purpose 5 Points of Departure 6 Specific Activities during 2007-2010 8 PREFACE This plan for quality management. In the plan, significant principles for quality management are described, as are a number of specific

Johannesson, Henrik

486

Integrated Waste Treatment Unit GFSI Risk Management Plan  

SciTech Connect (OSTI)

This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP).

W. A. Owca

2007-06-21T23:59:59.000Z

487

Life cycle assessment as an analytical tool in strategic environmental assessment. Lessons learned from a case study on municipal energy planning in Sweden  

SciTech Connect (OSTI)

Life cycle assessment (LCA) is explored as an analytical tool in strategic environmental assessment (SEA), illustrated by case where a previously developed SEA process was applied to municipal energy planning in Sweden. The process integrated decision-making tools for scenario planning, public participation and environmental assessment. This article describes the use of LCA for environmental assessment in this context, with focus on methodology and practical experiences. While LCA provides a systematic framework for the environmental assessment and a wider systems perspective than what is required in SEA, LCA cannot address all aspects of environmental impact required, and therefore needs to be complemented by other tools. The integration of LCA with tools for public participation and scenario planning posed certain methodological challenges, but provided an innovative approach to designing the scope of the environmental assessment and defining and assessing alternatives. - Research highlights: Black-Right-Pointing-Pointer LCA was explored as analytical tool in an SEA process of municipal energy planning. Black-Right-Pointing-Pointer The process also integrated LCA with scenario planning and public participation. Black-Right-Pointing-Pointer Benefits of using LCA were a systematic framework and wider systems perspective. Black-Right-Pointing-Pointer Integration of tools required some methodological challenges to be solved. Black-Right-Pointing-Pointer This proved an innovative approach to define alternatives and scope of assessment.

Bjoerklund, Anna, E-mail: annab@abe.kth.se

2012-01-15T23:59:59.000Z

488

FY 1996 annual work plan  

SciTech Connect (OSTI)

In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

NONE

1995-09-30T23:59:59.000Z

489

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMEDs guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A Phase I RFI was completed at WIPP as part of a Voluntary Release Assessment (VRA). The risk-based decision criteria recommended by EPA for the VRA were contained in a proposed Corrective Action rule for SWMUs (EPA, 1990). EPA Region VI has issued new risk-based screening criteria applicable to the WIPP SWMUs and AOCs.

Washington TRU Solutions LLC

2000-02-25T23:59:59.000Z

490

Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)  

SciTech Connect (OSTI)

The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford`s environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO{sub 3} plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996).

Higginson, M.C.

1994-10-01T23:59:59.000Z

491

Security Planning Using Zachman Framework for Enterprises Levent Ertaul Raadika Sudarsanam  

E-Print Network [OSTI]

153 Security Planning Using Zachman Framework for Enterprises Levent Ertaul Raadika Sudarsanam-governance. Keywords: Enterprise Security Planning, Enterprise Security Management, Strategic Planning. 1. Introduction (Perkins, 2001). As the need for a comprehensive security plan for an enterprise increases, this paper

Ertaull, Levent

492

Legacy Management CERCLA Sites. Quality Assurance Project Plan  

SciTech Connect (OSTI)

S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, Quality Assurance Requirements, ANSI/ASQC E4-2004, Quality Systems for Environmental Data and Technology Programs Requirements with Guidance for Use, and ISO 14001-2004, Environmental Management Systems, have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, Quality Assurance Program, identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, QA Program Implementation, identifies the TAC organizations that have responsibility for implementing the QA program requirements; and Appendix C of the QA Manual provides comparison tables that identify where the requirements of other standards are addressed in the QA Manual.

None

2007-05-03T23:59:59.000Z

493

Smithsonian Institution 2013 Strategic Sustainability  

E-Print Network [OSTI]

Smithsonian Institution 2013 Strategic Sustainability Performance Plan Office of Facilities for learning and teaching. The Smithsonian has been, and must be, sustainable for generations to come sustainability planning and performance. Therefore we include them in this plan, for example in the number

Mathis, Wayne N.

494

Wildlife Management Plan for the Oak Ridge Reservation  

SciTech Connect (OSTI)

This document outlines a plan for management of the wildlife resources on the Department of Energy's (DOE's) Oak Ridge Reservation. Management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; restoration of wildlife species; preservation, management, and enhancement of wildlife habitats; coordination of wildlife studies and characterization of areas; and law enforcement. Wildlife resources are divided into several categories, each with a specific set of objectives and procedures for attaining them. These objectives are management of (1) wildlife habitats to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species to produce selected species in desired numbers on designated land units; (3) game species for research, education, recreation, and public safety; (4) the Three Bend Scenic and Wildlife Management Refuge Area; (5) nuisance wildlife, including nonnative species, to achieve adequate population control for the maintenance of health and safety on the Reservation; (6) sensitive species (i.e., state or federally listed as endangered, threatened, of special concern, or in need of management) through preservation and protection of both the species and habitats critical to the survival of those species; and (7) wildlife disease. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency (TWRA) and the Oak Ridge National Laboratory through agreements between TWRA and DOE and between DOE and UT-Battelle, LLC.

Giffen, Neil R [ORNL; Evans, James W. [TWRA; Parr, Patricia Dreyer [ORNL

2007-10-01T23:59:59.000Z

495

Development of a mult-objective strategic management approach to improve decisions for pavement management practices in local agencies  

E-Print Network [OSTI]

Multiple objectives are often used by agencies trying to manage pavement networks. Often alternative investment strategies can accomplish the agencies target objectives. If the goal is to achieve the target objectives at the minimum cost...

Chang Albitres, Carlos Martin

2009-05-15T23:59:59.000Z

496

Turning Challenges into Opportunities: The IU College of Arts and Sciences Strategic Plan for 2009-2014  

E-Print Network [OSTI]

of enormous uncertainty. Meeting these challenges and transforming them into opportunities demand careful planning. Moreover, because plans such as this one are both proactive and responsive to constantly changing and Retention of a World-Class Faculty. . . . . . . . . . . . . . . . . . . . . 10 Research Productivity

Indiana University

497

APS1031 Infrastructure Planning University of Toronto  

E-Print Network [OSTI]

-requisite of sustainable development, and we look at how resilience can be built into our infrastructure plan. With case development policy? While each is a specialist area of practice, all have a basis in strategic planning to manage the financing and design processes. As the UN observed, resilience is the pre

Toronto, University of

498

DOE/NNSA Strategic Performance Evaluation Plan (PEP) FOR MANAGEMENT AND OPERATION OF THE PANTEX PLANT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganizationElectronic Reading2Q)382 THENETL CarbONJordan FOR

499

Strategic Energy Management Plan for the Santa Ynez Band of Chumash Indians  

Office of Scientific and Technical Information (OSTI)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of theResourcecomments/rss enExpansion ofMaximumresearchSteven Chu|

500

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

Washington TRU Solutions LLC

2001-02-25T23:59:59.000Z