Sample records for management program sites

  1. Site action plan for maintenance management program. Revision D

    SciTech Connect (OSTI)

    Pearson, A.W.

    1993-11-30T23:59:59.000Z

    (DOE) Order 4330.4B, ``Maintenance Management Program`` requires each site to develop a Site Action Plan for implementing a Maintenance Management Program. Nonnuclear facilities are required to address the 32 elements of Chapter 1: Guidelines for the Conduct of Maintenance at DOE Nonnuclear Facilities. This document details the degree of implementation for each element, and the Martin Marietta Specialty Components, Inc., plan for implementation of the items which remain to be completed. The original Pinellas Plant Maintenance Management Program Site Action Plan (Issue A) was completed March 27, 1991. The format was modified per DOE request and it was resubmitted as Issue B and approved by AL September 16, 1991. Issue C was submitted, and approved December 20, 1992. The most significant achievement during FY-93 were the implementation of plant wide Graded Approach, and Configuration Control programs. The methodologies for performing these activities were developed, and pilot programs were implemented to verify their effectiveness. Plant wide implementation of both programs is progressing on a high priority basis. The formalized method for grading equipment and facilities provides a basis for establishing uniform, risk based priorities. The risks involved are environment, safety, health and programmatic mission. Other achievements for FY-93, include the establishment of procedures for the decommissioning, and down-grading of facilities, improved work control, improved work performance reporting, improved quality plans, and improved operating procedures.

  2. Nevada Test Site 2000 Annual Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect (OSTI)

    Y. E.Townsend

    2001-02-01T23:59:59.000Z

    This report is a compilation of the calendar year 2000 groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). Contamination indicator data are presented in control chart and tabular form with investigation levels (IL) indicated. Gross water chemistry data are presented in graphical and tabular form. Other information in the report includes, the Cumulative Chronology for Area 5 RWMS Groundwater Monitoring Program, a brief description of the site hydrogeology, and the groundwater sampling procedure.

  3. Managing Legacy Records for Formerly Utilized Sites. Remedial Action Program Sites

    SciTech Connect (OSTI)

    Clayton, C. [DOE Office of Legacy Management, Washington, DC (United States); Gueretta, J. [Lead DOE Office of Legacy Management, Grand Junction, CO (United States); Tack, J. [Source One Management, Inc., Grand Junction, CO (United States); Widdop, M. [S.M. Stoller Corporation, Grand Junction, CO (United States)

    2008-07-01T23:59:59.000Z

    The Manhattan Engineer District (MED) and U.S. Atomic Energy Commission (AEC) contracted for support work through private and academic parties through the early 1960's. The work often involved radioactive materials. Residual radioactive contamination was left at some of more than 600 potentially contaminated (candidate) sites, and worker health and safety concerns remain from the site operations and subsequent remediation activities. The U.S. Department of Energy (DOE) initiated a program to identify and protect records of MED/AEC activities and of remediation work conducted under the Formerly Utilized Sites Remedial Action Program (FUSRAP) to aid in resolving questions about site conditions, liability, and worker health and safety and to ensure ongoing protectiveness of human health and the environment. This paper discusses DOE activities undertaken to locate records collections, confirm retention schedules and access requirements, and document information about the collections for use by future stewards. In conclusion: DOE-LM recognizes that records and information management is a critical component of effective LTS and M. Records are needed to answer questions about site conditions and demonstrate to the public in the future that the sites are safe. DOE-LM is working to satisfy present needs and anticipate future uses for FUSRAP records, and compile a collection of site and program information from which future stewards can readily locate and retrieve needed information. (authors)

  4. Nevada National Security Site 2012 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2013-02-11T23:59:59.000Z

    This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2012 results. During 2012, groundwater samples were collected and static water levels were measured at the three pilot wells surrounding the Area 5 RWMS. Groundwater samples were collected at UE5PW-1, UE5PW-2, and UE5PW-3 on March 21, August 7, August 21, and September 11, 2012, and static water levels were measured at each of the three pilot wells on March 19, June 6, August 2, and October 15, 2012. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Final results from samples collected in 2012 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

  5. Nevada Test Site 2002 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect (OSTI)

    Y. E. Townsend

    2003-02-01T23:59:59.000Z

    This report is a compilation of the calendar year 2002 groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). Wells Ue5PW-1, Ue5PW-2, and Ue5PW-3 were sampled semiannually for the required analytes: pH, specific conductance, major cations/anions, metals, tritium, total organic carbon (TOC), and total organic halogen (TOX). Results from all samples collected in 2002 were within established criteria. These data indicate that there has been no measurable impact to the uppermost aquifer from the Resource Conservation and Recovery Act(RCRA) regulated unit within the RWMS-5 and confirm that the detections of TOC and TOX in 2000 were false positives. Contamination indicator data are presented in control chart and tabular form with investigation levels (ILs) indicated. Gross water chemistry data are presented in graphical and tabular form. There were no major changes noted in the monitored groundwater elevation. There continues to be an extremely small gradient to the northeast with an average flow velocity of less than one foot per year. Other information in the report includes, the Cumulative Chronology for Area 5 RWMS Groundwater Monitoring Program, a brief description of the site hydrogeology, and the groundwater sampling procedure.

  6. Nevada Test Site 2001 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect (OSTI)

    Y. E. Townsend

    2002-02-01T23:59:59.000Z

    This report is a compilation of the calendar year 2001 groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). Contamination indicator data are presented in control chart and tabular form with investigation levels (ILs) indicated. Gross water chemistry data are presented in graphical and tabular form. Other information in the report includes, the Cumulative Chronology for Area 5 RWMS Groundwater Monitoring Program, a brief description of the site hydrogeology, and the groundwater sampling procedure. Wells Ue5PW-1, Ue5PW-2, and Ue5PW-3 were sampled semiannually for the required analytes: pH, specific conductance, major cations/anions, metals, tritium, total organic carbon (TOC), and total organic halogen (TOX). Due to detections of TOC and TOX in some samples collected in 2000, a plan, as approved by the Nevada Division of Environmental Protection (NDEP), was executed to collect an increased number and type of samples in 2001. Results from all samples collected in 2001 were below ILs. These data indicate that there has been no measurable impact to the uppermost aquifer from the Resource Conservation and Recovery Act (RCRA) regulated unit within the Area 5 RWMS and confirm that the detections of TOC and TOX in 2000 were false positives. There were no major changes noted in the monitored groundwater elevation. There continues to be an extremely small gradient to the northeast with an average flow velocity of less than one foot per year.

  7. Nevada Test Site 2009 Data Report: Groundwater Monitoring Program, Area 5 Radioactive Waste Management Site

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2010-01-19T23:59:59.000Z

    This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2009 results. During 2009, groundwater at each of the three pilot wells was sampled on March 10, 2009, and August 18, 2009, and water levels at each of the three pilot wells were measured on February 17, May 6, August 17, and November 10, 2009. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Results from all samples collected in 2009 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

  8. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect (OSTI)

    Chavis, D.M.

    1992-05-01T23:59:59.000Z

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  9. Nevada National Security Site 2011 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2012-02-27T23:59:59.000Z

    This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2011 results. During 2011, groundwater samples were collected and static water levels were measured at the three pilot wells surrounding the Area 5 RWMS. Samples were collected at UE5PW-1 on March 8, August 2, August 24, and October 19, 2011; at UE5PW-2 on March 8, August 2, August 23, and October 19, 2011; and at UE5PW-3 on March 8, August 2, August 23, and October 19, 2011. Static water levels were measured at each of the three pilot wells on March 1, June 7, August 1, and October 17, 2011. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Initial total organic carbon and total organic halides results for samples collected in August 2011 were above previous measurements and, in some cases, above the established investigation limits. However, after field sample pumps and tubing were disinfected with Clorox solution, the results returned to normal levels. Final results from samples collected in 2011 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

  10. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect (OSTI)

    Chavis, D.M.

    1992-05-01T23:59:59.000Z

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  11. Survey on Social Networking Site for Engineering Management Program

    E-Print Network [OSTI]

    Mokkarala, Rajyalakshmi Sirisha

    2012-07-27T23:59:59.000Z

    Social Networking Sites (SNSs) such as Facebook, LinkedIn and Twitter have gained much popularity as Web 2.0 technologies and have been widely adopted by different age groups from teenagers to students to working professionals. ...

  12. Nevada National Security Site 2013 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect (OSTI)

    Hudson, David B

    2014-02-13T23:59:59.000Z

    This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site, Nye County, Nevada. Groundwater samples from the aquifer immediately below the Area 5 RWMS have been collected and analyzed and static water levels have been measured in this aquifer since 1993. This report updates these data to include the 2013 results. Beginning with this report, analysis results for leachate collected from the mixed-waste cell at the Area 5 RWMS (Cell 18) are also included.

  13. Savannah River Site Waste Management Program Plan, FY 1993. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-06-01T23:59:59.000Z

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes.

  14. Managing Legacy Records for Formerly Utilized Sites Remedial Action Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment ofLetterEconomyDr.Energy University Managing Increased

  15. Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

  16. Nevada Test Site 2007 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2008-01-01T23:59:59.000Z

    This report is a compilation of the groundwater sampling results from three monitoring wells located near the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS), Nye County, Nevada, for calendar year 2007. The NTS is an approximately 3,561 square kilometer (1,375 square mile) restricted-access federal installation located approximately 105 kilometers (65 miles) northwest of Las Vegas, Nevada (Figure 1). Pilot wells UE5PW-1, UE5PW-2, and UE5PW-3 are used to monitor the groundwater at the Area 5 RWMS (Figure 2). In addition to groundwater monitoring results, this report includes information regarding site hydrogeology, well construction, sample collection, and meteorological data measured at the Area 5 RWMS. The disposal of low-level radioactive waste and mixed low-level radioactive waste at the Area 5 RWMS is regulated by U.S. Department of Energy (DOE) Order 435.1, 'Radioactive Waste Management'. The disposal of mixed low-level radioactive waste is also regulated by the state of Nevada under the Resource Conservation and Recovery Act (RCRA) regulation Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities' (CFR, 1999). The format of this report was requested by the Nevada Division of Environmental Protection (NDEP) in a letter dated August 12, 1997. The appearance and arrangement of this document have been modified slightly since that date to provide additional information and to facilitate the readability of the document. The objective of this report is to satisfy any Area 5 RWMS reporting agreements between DOE and NDEP.

  17. 2005 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect (OSTI)

    Bechtel Nevada

    2006-02-01T23:59:59.000Z

    This report is a compilation of the calendar year 2005 groundwater sampling results from the Area 5 Radioactive Waste Management Site. In additon to providing groundwater monitoring results, this report also includes information regarding site hydrogeology, well construction, sample collection, and meteorological data measured at the Area 5 Radioactive Waste Management Site at the Nevada Test Site, Ny County, Nevada.

  18. Alternatives for management of wastes generated by the formerly utilized sites remedial action program and supplement

    SciTech Connect (OSTI)

    Gilbert, T.L.; Peterson, J.M.; Vocke, R.W.; Alexander, J.K.

    1983-03-01T23:59:59.000Z

    Alternatives for disposal or stabilization of the wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP) are identified and compared, with emphasis on the long-term aspects. These wastes consist of soil material and rubble containing trace amounts of radionuclides. A detailed pathway analysis for the dose to the maximally exposed individual is carried out using an adaptation of the natural analogue method. Comparisons of the different alternatives, based on the results of the pathway analysis and qualitative cost considerations, indicate that, if the hazard is such that the wastes must be removed and disposed of rather than stabilized in place, disposal by immediate dispersal is preferable to containment, and containment followed by slow planned dispersal is preferable to containment without dispersal. The Supplement presents refinements of work that was reported at the 1982 International Decommissioning Symposium. The new material consists of revisions of the estimates of the predicted potential dose to the maximally exposed individual and a more detailed comparative assessment of the radiological impacts of alternatives for management of wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP).

  19. 1999 data report: Groundwater monitoring program Area 5 Radioactive Waste Management Site

    SciTech Connect (OSTI)

    Yvonne Townsend

    2000-03-01T23:59:59.000Z

    This report is a compilation of the annual 1999 groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). Contamination indicator data are presented in control chart and tabular form with investigation levels indicated. Gross water chemistry data are presented in graphical and tabular form. Other information in the report includes, the Cumulative Chronology for Area 5 RWMS Groundwater Monitoring Program, a brief description of the site hydrogeology and the groundwater sampling procedure. Wells Ue5PW-1, Ue5PW-2, and Ue5PW-3 were sampled semiannually for pH, specific conductance, major cations/anions, metals, tritium, total organic carbon (TOC), and total organic halogen (TOX). Results indicate that there has been no measurable impact to the uppermost aquifer from the Resource Conservation and Recovery Act (RCRA) regulated unit within the Area 5 RWMS. Groundwater elevation was monitored quarterly with no major changes noted. There continues to be an extremely small gradient to the northeast with a flow velocity less than one foot per year; however, this is subject to change because the wells have a similar groundwater elevation.

  20. Contracts and management services site support program plan WBS 6.10.14

    SciTech Connect (OSTI)

    Knoll, J.M. Jr.

    1994-09-01T23:59:59.000Z

    Contracts and Management Services is recognized as the central focal point for programs having company or sitewide application in pursuit of the Hanford Missions`s financial and operational objectives. Contracts and Management Services actively pursues cost savings and operational efficiencies through: Management Standards by ensuring all employees have an accessible, integrated system of clear, complete, accurate, timely, and useful management control policies and procedures; Contract Reform by restructuring the contract, organization, and cost accounting systems to refocus Hanford contract activities on output products; Systems and Operations Evaluation by directing the Cost Reduction program, Great Ideas, and Span of Management activities; Program Administration by enforcing conditions of Accountability (whether DEAR-based or FAR-based) for WHC, BCSR, ICF KH, and BHI; Contract Performance activities; chairing the WHC Cost Reduction Review Board; and analyzing companywide Performance Measures; Data Standards and Administration by establishing and directing the company data management program; giving direction to the major RL programs and mission areas for implementation of cost-effective and efficient data management practices; directing all operations, application, and interfaces contained within the Hanford PeopleCore System; directing accomplishment and delivery of TPA data management milestones; and directing the sitewide data management processes for Data Standards and the Data Directory.

  1. Site Office Manager, Princeton

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will serve as the Princeton Site Office (PSO) Manager by providing overall executive leadership to the PSO.

  2. Niagara Falls Storage Site, Annual site environmental report, Lewiston, New York, Calendar year 1986: Surplus Facilities Management Program (SFMP)

    SciTech Connect (OSTI)

    Not Available

    1987-06-01T23:59:59.000Z

    During 1986, the environmental monitoring program was continued at the Niagara Falls Storage Site (NFSS), a US Department of Energy (DOE) surplus facility located in Niagara County, New York, presently used for the interim storage of radioactive residues and contaminated soils and rubble. The monitoring program is being conducted by Bechtel National, Inc. The monitoring program at the NFSS measures radon gas concentrations in air; external gamma radiation levels; and uranium and radium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess its potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, this individual would receive an annual external exposure approximately equivalent to 6% of the DOE radiation protection standard of 100 mrem/yr. By comparison, the incremental dose received from living in a brick house versus a wooden house is 10 mrem/yr above background. The cumulative dose to the population within an 80-km (50-mi) radius of the NFSS that would result from radioactive materials present at the site would be indistinguishable from the dose that the same population would receive from naturally occurring radioactive sources. Results of the 1986 monitoring show that the NFSS is in compliance with the DOE radiation protection standard. 14 refs., 11 figs., 14 tabs.

  3. Depleted uranium hexafluoride management program : data compilation for the Portsmouth site.

    SciTech Connect (OSTI)

    Hartmann, H. M.

    2001-06-05T23:59:59.000Z

    This report is a compilation of data and analyses for the Portsmouth site, near Portsmouth, Ohio. The data were collected and the analyses were done in support of the U.S. Department of Energy (DOE) 1999 Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride (DOE/EIS-0269). The report describes the affected environment at the Portsmouth site and summarizes potential environmental impacts that could result from conducting the following depleted uranium hexafluoride (UF{sub 6}) management activities at the site: continued cylinder storage, preparation of cylinders for shipment, conversion, and long-term storage. DOE's preferred alternative is to begin converting the depleted UF{sub 6} inventory as soon as possible to either uranium oxide, uranium metal, or a combination of both, while allowing for use of as much of this inventory as possible.

  4. Site Support Program Plan Infrastructure Program

    SciTech Connect (OSTI)

    NONE

    1995-09-26T23:59:59.000Z

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  5. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, {approximately} 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner.

  6. Depleted uranium hexafluoride management program : data compilation for the K-25 site.

    SciTech Connect (OSTI)

    Hartmann, H. M.

    2001-06-05T23:59:59.000Z

    This report is a compilation of data and analyses for the K-25 site on the Oak Ridge Reservation, Oak Ridge, Tennessee. The data were collected and the analyses were done in support of the U.S. Department of Energy (DOE) 1999 Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride (DOE/EIS-0269). The report describes the affected environment at the K-25 site and summarizes the potential environmental impacts that could result from continued cylinder storage and preparation of cylinders for shipment at the site. It is probable that the cylinders at the K-25 site will be shipped to another site for conversion. Because conversion and long-term storage of the entire inventory at the K-25 site are highly unlikely, these data are not presented in this report. DOE's preferred alternative is to begin converting the depleted uranium hexafluoride inventory as soon as possible to either uranium oxide, uranium metal, or a combination of both, while allowing for use of as much of this inventory as possible.

  7. Depleted uranium hexafluoride management program : data compilation for the Paducah site.

    SciTech Connect (OSTI)

    Hartmann, H.

    2001-06-07T23:59:59.000Z

    This report is a compilation of data and analyses for the Paducah site, near Paducah, Kentucky. The data were collected and the analyses were done in support of the U.S. Department of Energy (DOE) 1999 Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride (DOE/EIS-0269). The report describes the affected environment at the Paducah site and summarizes potential environmental impacts that could result from conducting the following depleted uranium hexafluoride (UF{sub 6}) activities at the site: continued cylinder storage, preparation of cylinders for shipment, conversion, and long-term storage. DOE's preferred alternative is to begin converting the depleted UF{sub 6} inventory as soon as possible to either uranium oxide, uranium metal, or a combination of both, while allowing for use of as much of this inventory as possible.

  8. Site Management Guide (Blue Book)

    SciTech Connect (OSTI)

    None

    2014-03-01T23:59:59.000Z

    The U.S. Department of Energy (Department) Office of Legacy Management (LM), established in 2003, manages the Department’s postclosure responsibilities and ensures the future protection of human health and the environment. During World War II and the Cold War, the Federal government developed and operated a vast network of industrial facilities for the research, production, and testing of nuclear weapons, as well as other scientific and engineering research. These processes left a legacy of radioactive and chemical waste, environmental contamination, and hazardous facilities and materials at well over 100 sites. Since 1989, the Department has taken an aggressive accelerated cleanup approach to reduce risks and cut costs. At most Departmental sites undergoing cleanup, some residual hazards will remain at the time cleanup is completed due to financial and technical impracticality. However, the Department still has an obligation to protect human health and the environment after cleanup is completed. LM fulfills DOE’s postclosure obligation by providing long-term management of postcleanup sites which do not have continuing missions. LM is also responsible for sites under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Currently, the U.S. Army Corps of Engineers (USACE) is responsible for site surveys and remediation at FUSRAP sites. Once remediation is completed, LM becomes responsible for long-term management. LM also has responsibility for uranium processing sites addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). UMTRCA Title II sites are sites that were commercially owned and are regulated under a U.S. Nuclear Regulatory Commission (NRC) license. For license termination, the owner must conduct an NRC-approved cleanup of any on-site radioactive waste remaining from former uranium ore-processing operations. The site owner must also provide full funding for inspections and, if necessary, ongoing maintenance. Once site cleanup is complete, LM accepts title to these sites on behalf of the United States and assumes long-term management.

  9. Niagara falls storage site: Annual site environmental report, Lewiston, New York, Calendar Year 1988: Surplus Facilities Management Program (SFMP)

    SciTech Connect (OSTI)

    Not Available

    1989-04-01T23:59:59.000Z

    The monitoring program at the Niagara Falls Storage Site (NFSS) measures radon concentrations in air; external gamma radiation levels; and uranium and radium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess its potential effect on public health, the radiation dose was calculated for a hypothetical maximally exposed individual. Based on the conservative scenario described in this report, this hypothetical individual receives an annual external exposure approximately equivalent to 6 percent of the DOE radiation protection standard of 100 mrem/yr. This exposure is less than a person receives during two round-trip flights from New York to Los Angeles (because of the greater amounts of cosmic radiation at higher altitudes). The cumulative dose to the population within an 80-km (50-mi) radius of the NFSS that results from radioactive materials present at the site is indistinguishable from the dose that the same population receives from naturally occurring radioactive sources. Results of the 1988 monitoring show that the NFSS is in compliance with applicable DOE radiation protection standards. 17 refs., 31 figs., 20 tabs.

  10. Oak Ridge Reservation site management plan for the environmental restoration program

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    This report describes the overall approach for addressing environmental contamination on the Oak Ridge Reservation (ORR) National Priorities List site located in east Tennessee. The cleanup strategy reflected in this site management plan (SMP) has been developed to accelerate the transition of areas of concern (AOCs) from characterization to remediation by making decisions at the watershed scale based on recommended land uses. Project scoping involves the use of defined remedial action objectives, which are based in part on the land uses selected for the project sites. To provide a consistent land use approach that accommodates the needs of all stakeholders responsible for the remediation and reutilization of the ORR, a reservation-wide strategy has been developed. The Common Ground process is a stakeholder-driven process to determine preferred land use options for the ORR so that clean-up operations will be based on the most likely and acceptable land uses. DOE utilized the information gathered in the Common Ground process to recommend desired land uses for the ORR. The land uses recommended by DOE as a result of the Common Ground process are being used for planning land and facility use/reuse for the next 25 years. Land uses recommended for the ORR in conducting CERCLA remedial activities are conservation, industrial use, and waste management.

  11. Enterprise Risk Management Program

    E-Print Network [OSTI]

    Hayden, Nancy J.

    Enterprise Risk Management Program DRAFT Introduction to Enterprise Risk Management at UVM 1 #12;Enterprise Risk Management Program DRAFT What is Enterprise Risk Management? Enterprise risk management governance, and accountability · Facilitates effective management of the uncertainty and associated risks

  12. Managing contaminated sites

    SciTech Connect (OSTI)

    Asante-Duah, D.K.

    1997-12-31T23:59:59.000Z

    This book summarizes the generic principles of contaminated site management. The book walks the reader through contaminated site identification, risk assessment and the evaluation of remediation alternatives. The book is divided into two major sections, problem diagnosis and development of site restoration. In problem diagnosis, the general principles of site investigation are discussed, including the objectives and differences between tier 1,2, and 3 investigations. The principles of data collection and analysis are presented. A small quantitative discussion of statistical analysis is presented but in keeping with the objectives of the text is not sufficient comprehensive or detailed to provide much of a guide for the practitioner. Chapters on contaminant fate and transport processes and risk assessment help the reader understand the role of these issues in site investigation and remedial planning. A chapter is also included on elements of a site characterization activity, which summarizes some of the key considerations in conducting a site investigation.

  13. Sitewide soil and debris management program for a DOE site under remediation

    SciTech Connect (OSTI)

    Harvey, B.F. [Parsons Environmental Services, Inc., Fairfield, OH (United States)

    1993-11-01T23:59:59.000Z

    In 1986, the United States Department of Energy (DOE) and the United States Environmental Protection Agency (US EPA) entered into a Federal Facility Compliance Agreement (FFCA). The agreement included provisions to investigate and define the nature and extent of contamination and to determine the necessity for remediation at the Fernald Environmental Management Project (FEMP) near Cincinnati, Ohio. The agreement is also pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Uranium enrichment production activities at the facility ceased in 1989. The FEMP mission is now environmental clean-up and remediation under the management of the Fernald Environmental Restoration Management Corporation. This report describes objectives and activities of remediation efforts at FEMP.

  14. Attributes of the Federal Energy Management Program's Federal Site Building Characteristics Database

    SciTech Connect (OSTI)

    Loper, Susan A.; Sandusky, William F.

    2010-12-31T23:59:59.000Z

    Typically, the Federal building stock is referred to as a group of about one-half million buildings throughout the United States. Additional information beyond this level is generally limited to distribution of that total by agency and maybe distribution of the total by state. However, additional characterization of the Federal building stock is required as the Federal sector seeks ways to implement efficiency projects to reduce energy and water use intensity as mandated by legislation and Executive Order. Using a Federal facility database that was assembled for use in a geographic information system tool, additional characterization of the Federal building stock is provided including information regarding the geographical distribution of sites, building counts and percentage of total by agency, distribution of sites and building totals by agency, distribution of building count and floor space by Federal building type classification by agency, and rank ordering of sites, buildings, and floor space by state. A case study is provided regarding how the building stock has changed for the Department of Energy from 2000 through 2008.

  15. Program Managers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program Direction and Analysis Deputy Director

  16. Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment, April 2011

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM Flash2011-12Approvedof6,Projects | Department ATTACHMENTS11-18 Site: Los

  17. Groundwater protection management program plan

    SciTech Connect (OSTI)

    Not Available

    1992-06-01T23:59:59.000Z

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ``Groundwater Protection Management Program Plan`` (groundwater protection plan) of sufficient scope and detail to reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

  18. Safety and quality management and administration Fiscal Year 1995 site support program plan WBS 6.7.2.6

    SciTech Connect (OSTI)

    Hagan, J.W.

    1994-09-01T23:59:59.000Z

    The mission of the Emergency, Safety, and Quality Services (ESQ) management and Program Integration is to provide leadership for the ESQ Department, coordinate business management activities of the ESQ department, and the programs it supports, as well as to plan organize, direct, and control other activities that require department-wide coordination. Primary activities include providing strategic and business planning and reporting support to ESQ management; developing and documenting ESQ management systems and procedures; coordinating ESQ`s self-assessment and Award Fee self evaluation efforts; coordinating the ESQ departments`s communication, total quality, cost savings, and productivity efforts; and tracking ESQ commitments and staffing data. This program element also provides program direction and performance assessment for the ESH&Q division of ICF KH. The ESH&Q Division educates ICF KH management and employees to protect personnel and the environment; identifies, interprets and inspects to requirements; provides administrative and field support; performs final acceptance of construction; assesses effectiveness of ICF KH programs and processes, and performs baseline ESH&Q assessments.

  19. Enterprise Risk Management Program

    E-Print Network [OSTI]

    Hayden, Nancy J.

    Enterprise Risk Management Program Guide to Risk Assessment & Response August 16, 2012 #12; i ...........26 List of Figures Figure 1: The Risk Management Process.......................................................................................................12 #12; 1 Overview The risk management process--of identifying, analyzing, evaluating

  20. Sustainable Energy Management Programs

    E-Print Network [OSTI]

    Hanner, S.

    2014-01-01T23:59:59.000Z

    Sustainable Energy Management Programs Steve Hanner Allen ISD/TEMA . ESL-KT-14-11-45 CATEE 2014: Clean Air Through Efficiency Conference, Dallas, Texas Nov. 18-20 Starting an Energy Management Program • Recognize need, Elicit District Commitment... • Appoint Energy Manager • Analyze Existing Conditions • Develop Plan • Implement and Monitor Program ESL-KT-14-11-45 CATEE 2014: Clean Air Through Efficiency Conference, Dallas, Texas Nov. 18-20 Sustainable Programs Feature – District Commitment...

  1. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1, Appendix C, Savannah River Site Spent Nuclear Fuel Mangement Program

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    The US Department of Energy (DOE) is engaged in two related decision making processes concerning: (1) the transportation, receipt, processing, and storage of spent nuclear fuel (SNF) at the DOE Idaho National Engineering Laboratory (INEL) which will focus on the next 10 years; and (2) programmatic decisions on future spent nuclear fuel management which will emphasize the next 40 years. DOE is analyzing the environmental consequences of these spent nuclear fuel management actions in this two-volume Environmental Impact Statement (EIS). Volume 1 supports broad programmatic decisions that will have applicability across the DOE complex and describes in detail the purpose and need for this DOE action. Volume 2 is specific to actions at the INEL. This document, which limits its discussion to the Savannah River Site (SRS) spent nuclear fuel management program, supports Volume 1 of the EIS. Following the introduction, Chapter 2 contains background information related to the SRS and the framework of environmental regulations pertinent to spent nuclear fuel management. Chapter 3 identifies spent nuclear fuel management alternatives that DOE could implement at the SRS, and summarizes their potential environmental consequences. Chapter 4 describes the existing environmental resources of the SRS that spent nuclear fuel activities could affect. Chapter 5 analyzes in detail the environmental consequences of each spent nuclear fuel management alternative and describes cumulative impacts. The chapter also contains information on unavoidable adverse impacts, commitment of resources, short-term use of the environment and mitigation measures.

  2. Records Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-02-03T23:59:59.000Z

    The Order sets forth requirements and responsibilities for implementing and maintaining a cost-effective records management program throughout the Department of Energy.

  3. Records Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-07-26T23:59:59.000Z

    The Order sets forth requirements and responsibilities for establishing and maintaining a program for the efficient and economical management of records and information assets.

  4. Management Control Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-04-18T23:59:59.000Z

    To establish requirements and responsibilities for the Department of Energy Management Control Program. Cancels DOE O 413.1. Canceled by DOE O 413.1B.

  5. Acquisition Career Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-05-14T23:59:59.000Z

    The order sets forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Management Program. Cancels DOE O 361.1B.

  6. ISSUES MANAGEMENT PROGRAM MANUAL

    E-Print Network [OSTI]

    Gravois, Melanie

    2007-01-01T23:59:59.000Z

    LBNL/PUB-5519 (1), Rev. 032 ISSUES MANAGEMENT PROGRAM MANUAL LBNL/PUB-5519 (1), Rev.Berkeley National Laboratory LBNL/PUB-5519 (1), Rev. 0

  7. Site decommissioning management plan

    SciTech Connect (OSTI)

    Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

    1993-10-01T23:59:59.000Z

    The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff`s strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites.

  8. Site Energy Reduction Program

    E-Print Network [OSTI]

    Jagen, P. R.

    2007-01-01T23:59:59.000Z

    DuPont’s Sabine River Works site is the largest energy consuming location within DuPont. In the year 2000, each production area was encouraged to reduce energy costs. By 2003 site energy consumption was down 16% on an absolute basis and 12% on a BTU...

  9. Database Management Certificate Program

    E-Print Network [OSTI]

    Rose, Michael R.

    Database Management Certificate Program DATABASE TECHNOLOGIES 13 Today, organizations in every to obtain general data analysis and management skills or apply both Oracle and Microsoft SQL Server database capabilities of relational databases in conjunction with the new "Big Data" management frameworks for data

  10. Hanford site ground water protection management plan

    SciTech Connect (OSTI)

    Not Available

    1994-10-01T23:59:59.000Z

    Ground water protection at the Hanford Site consists of preventative and remedial measures that are implemented in compliance with a variety of environmental regulations at local, state, and federal levels. These measures seek to ensure that the resource can sustain a broad range of beneficial uses. To effectively coordinate and ensure compliance with applicable regulations, the U.S. Department of Energy has issued DOE Order 5400.1 (DOE 1988a). This order requires all U.S. Department of Energy facilities to prepare separate ground water protection program descriptions and plans. This document describes the Ground Water Protection Management Plan (GPMP) for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the GPMP covers the following general topical areas: (1) documentation of the ground water regime; (2) design and implementation of a ground water monitoring program to support resource management and comply with applicable laws and regulations; (3) a management program for ground water protection and remediation; (4) a summary and identification of areas that may be contaminated with hazardous waste; (5) strategies for controlling hazardous waste sources; (6) a remedial action program; and (7) decontamination, decommissioning, and related remedial action requirements. Many of the above elements are currently covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing ground water protection activities. The GPMP provides the ground water protection policy and strategies for ground water protection/management at the Hanford Site, as well as an implementation plan to improve coordination of site ground water activities.

  11. Land Management - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |Is Your Home asLCLSLaboratoryRowland to receiveLand Management About

  12. Results of the radiological survey at the Sacandaga site Glenville, New York. Waste Management Research and Development Programs

    SciTech Connect (OSTI)

    Foley, R.D.; Cottrell, W.D.; Carrier, R.F.

    1992-08-01T23:59:59.000Z

    The Sacandaga site, located on Sacandaga Road, Glenville, New York, was operated by the General Electric Company for the Atomic Energy Commission (AEC) between 1947 and 1951. Originally used for the study and development of radar during World War II, the facilities housed later operations involving physics studies and sodium technology development in support of breeder reactor design and other AEC programs. Though not in use since the original equipment was dismantled and removed in the early 1950s, portions of the 51-acre site are known to contain buried rubble from demolished structures used in former operations. At the request of the Office of Naval Reactors through the Office of Remedial Action and Waste Technology, a characterization of current radiological conditions over the site was performed between August and October 1989. The survey included the measurement of direct radiation levels (gamma, alpha, and beta-gamma) over all surfaces both inside and outside the building and tunnel, radionuclide analysis of systematic, biased, and auger hole soil samples, and analysis of sediments from underground structures. Gamma logging of auger holes was conducted and removable contamination levels inside the tunnel were determined. Samples of soil and structural materials from within and around an excavated concrete bunker were analyzed to determine concentrations of radionuclides and nonradioactive elemental beryllium.

  13. Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1998 mid-year progress report

    SciTech Connect (OSTI)

    NONE

    1998-05-01T23:59:59.000Z

    Pacific Northwest National Laboratory was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996 and six (6) in Fiscal Year 1997. This section summarizes how each grant addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in four areas: Tank Waste Remediation, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Cleanup, and Health Effects.

  14. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards-Fiscal Year 1999 Mid-Year Progress Report

    SciTech Connect (OSTI)

    Peurrung, L.M.

    1999-06-30T23:59:59.000Z

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, and eight in fiscal year 1998. This section summarizes how each grant addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in five areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Clean Up, and Health Effects.

  15. Hanford Site Voluntary Protection Program - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) EnvironmentalGyroSolé(tm) Harmonicbet When yourecovery WasteSiteProgram About

  16. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement; Volume 1, Appendix F, Nevada Test Site and Oak Ridge Reservation Spent Nuclear Fuel Management Programs

    SciTech Connect (OSTI)

    NONE

    1994-06-01T23:59:59.000Z

    This volume addresses the interim storage of spent nuclear fuel (SNF) at two US Department of Energy sites, the Nevada Test Site (NTS) and the Oak Ridge Reservation (ORR). These sites are being considered to provide a reasonable range of alternative settings at which future SNF management activities could be conducted. These locations are not currently involved in management of large quantities of SNF; NTS has none, and ORR has only small quantities. But NTS and ORR do offer experience and infrastructure for the handling, processing and storage of radioactive materials, and they do exemplify a broad spectrum of environmental parameters. This broad spectrum of environmental parameters will provide, a perspective on whether and how such location attributes may relate to potential environmental impacts. Consideration of these two sites will permit a programmatic decision to be based upon an assessment of the feasible options without bias, to the current storage sites. This volume is divided into four parts. Part One is the volume introduction. Part Two contains chapters one through five for the NTS, as well as references contained in chapter six. Part Three contains chapters one through five for the ORR, as well as references contained in chapter six. Part Four is summary information including the list of preparers, organizations contacted, acronyms, and abbreviations for both the NTS and the ORR. A Table of Contents, List of Figures, and List of Tables are included in parts Two, Three, and Four. This approach permitted the inclusion of both sites in one volume while maintaining consistent chapter numbering.

  17. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards -- Fiscal Year 2002 Mid-Year Progress Report

    SciTech Connect (OSTI)

    Bredt, Paul R.; Ainsworth, Calvin C.; Brockman, Fred J.; Camaioni, Donald M.; Egorov, Oleg B.; Felmy, Andrew R.; Gorby, Yuri A.; Grate, Jay W.; Greenwood, Margaret S.; Hay, Benjamin P.; Hess, Nancy J.; Hubler, Timothy L.; Icenhower, Jonathan P.; Mattigod, Shas V.; McGrail, B. Peter; Meyer, Philip D.; Murray, Christopher J.; Panetta, Paul D.; Pfund, David M.; Rai, Dhanpat; Su, Yali; Sundaram, S. K.; Weber, William J.; Zachara, John M.

    2002-06-11T23:59:59.000Z

    Pacific Northwest National Laboratory has been awarded a total of 80 Environmental Management Science Program (EMSP) research grants since the inception of the program in 1996. The Laboratory has collaborated on an additional 14 EMSP awards with funding received through other institution. This report describes how each of the projects awarded in 1999, 2000, and 2001 addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in the individual project reports included in this document. Projects are under way in three main areas: Tank Waste Remediation, Decontamination and Decommissioning, and Soil and Groundwater Cleanup.

  18. Merck Global Energy Management Program

    E-Print Network [OSTI]

    Williams, K.

    2005-01-01T23:59:59.000Z

    automation system (BAS) management, insulation programs, employee awareness, and implementation of best practices. MERIT set an aggressive target of 3.5% savings over 2003 consumption and expects to achieve a 4.37 percent savings in 2004. The major... initiatives for 2004 include employee awareness, additional participation of non-manufacturing sites, minimization of capital investment on utility infrastructure, and implementation of energy best practices on all new projects. The original charter...

  19. Management and Program Analyst (Operations Manager)

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will serve as a Management and Program Analyst in the Office of Strategic Programs in the DOE-EERE.

  20. Hanford Site environmental management specification

    SciTech Connect (OSTI)

    Grygiel, M.L.

    1998-06-10T23:59:59.000Z

    The US Department of Energy, Richland Operations Office (RL) uses this Hanford Site Environmental Management Specification (Specification) to document top-level mission requirements and planning assumptions for the prime contractors involved in Hanford Site cleanup and infrastructure activities under the responsibility of the US Department of Energy, Office of Environmental Management. This Specification describes at a top level the activities, facilities, and infrastructure necessary to accomplish the cleanup of the Hanford Site and assigns this scope to Site contractors and their respective projects. This Specification also references the key National Environmental Policy Act of 1969 (NEPA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and safety documentation necessary to accurately describe the cleanup at a summary level. The information contained in this document reflects RL`s application of values, priorities, and critical success factors expressed by those involved with and affected by the Hanford Site project. The prime contractors and their projects develop complete baselines and work plans to implement this Specification. These lower-level documents and the data that support them, together with this Specification, represent the full set of requirements applicable to the contractors and their projects. Figure 1-1 shows the relationship of this Specification to the other basic Site documents. Similarly, the documents, orders, and laws referenced in this specification represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

  1. Performance Demonstration Program Management Plan

    SciTech Connect (OSTI)

    Carlsbad Field Office

    2005-07-01T23:59:59.000Z

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization’s quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  2. Pennsylvania Act 38/Nutrient Management Program/Technical Manual January 2013

    E-Print Network [OSTI]

    Guiltinan, Mark

    materials on the PA Nutrient Management Program web site: httpPennsylvania Act 38/Nutrient Management Program/Technical Manual January 2013 Supplement 19 List

  3. Demand Response: Load Management Programs 

    E-Print Network [OSTI]

    Simon, J.

    2012-01-01T23:59:59.000Z

    CenterPoint Load Management Programs CATEE Conference October, 2012 Agenda Outline I. General Demand Response Definition II. General Demand Response Program Rules III. CenterPoint Commercial Program IV. CenterPoint Residential Programs...

  4. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards - Fiscal Year 2000 Mid-Year Progress Report

    SciTech Connect (OSTI)

    CD Carlson; SQ Bennett

    2000-07-25T23:59:59.000Z

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, eight in fiscal year 1998, and seven in fiscal year 1999. All of the fiscal year 1996 award projects have been completed and will publish final reports, so their annual updates will not be included in this document. This section summarizes how each of the currently funded grants addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research performed at PNNL is focused primarily in four areas: Tank Waste Remediation; Decontamination and Decommissioning; Spent Nuclear Fuel and Nuclear Materials; and Soil and Groundwater Cleanup.

  5. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards - Fiscal Year 2000 Mid-Year Progress Report

    SciTech Connect (OSTI)

    Carlson, Clark D.; Bennett, Sheila Q.

    2000-07-25T23:59:59.000Z

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, eight in fiscal year 1998 and seven in fiscal year 1999.(a) All of the fiscal year 1996 awards have been completed and the Principal Investigators are writing final reports, so their summaries will not be included in this document. This section summarizes how each of the currently funded grants addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research performed at PNNL is focused primarily in four areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, and Soil and Groundwater Cleanup.

  6. Coastal Area Management Program (Alabama)

    Broader source: Energy.gov [DOE]

    This program regulates coastal activities, permits required, discharges to coastal waters and siting, construction and operation of energy facilities. ADEM's Coastal Program rules include the...

  7. Operations and Maintenance Program Management

    Broader source: Energy.gov [DOE]

    Effective management is critical to any operations and maintenance (O&M) program. The management function should bind the distinct parts of the O&M program into a cohesive entity.

  8. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1989-01-01T23:59:59.000Z

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  9. ISSUES MANAGEMENT PROGRAM MANUAL

    SciTech Connect (OSTI)

    Gravois, Melanie

    2007-06-27T23:59:59.000Z

    The Lawrence Berkeley National Laboratory (LBNL) Issues Management Program encompasses the continuous monitoring of work programs, performance and safety to promptly identify issues to determine their risk and significance, their causes, and to identify and effectively implement corrective actions to ensure successful resolution and prevent the same or similar problems from occurring. This document describes the LBNL Issues Management Program and prescribes the process for issues identification, tracking, resolution, closure, validation, and effectiveness of corrective actions. Issues that are governed by this program include program and performance deficiencies or nonconformances that may be identified through employee discovery, internal or external oversight assessment findings, suggested process improvements and associated actions that require formal corrective action. Issues may also be identified in and/or may result in Root Cause Analysis (RCA) reports, Price Anderson Amendment Act (PAAA) reports, Occurrence Reporting and Processing System (ORPS) reports, Accident Investigation reports, assessment reports, and External Oversight reports. The scope of these issues may include issues of both high and low significance as well as adverse conditions that meet the reporting requirements of the University of California (UC) Assurance Plan for LBNL or other reporting entities (e.g., U.S. Environmental Protection Agency, U.S. Department of Energy). Issues that are found as a result of a walk-around or workspace inspection that can be immediately corrected or fixed are exempt from the requirements of this document.

  10. HANFORD SITE SUSTAINABILITY PROGRAM RICHLAND WASHINGTON - 12464

    SciTech Connect (OSTI)

    FRITZ LL

    2012-01-12T23:59:59.000Z

    In support of implementation of Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance, the Hanford Site Sustainability Plan was developed to implement strategies and activities required to achieve the prescribed goals in the EO as well as demonstrate measurable progress in environmental stewardship at the Hanford Site. The Hanford Site Sustainability Program was developed to demonstrate progress towards sustainability goals as defined and established in Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance; EO 13423, Strengthening Federal Environmental, Energy and Transportation Management, and several applicable Energy Acts. Multiple initiatives were undertaken in Fiscal Year (FY) 2011 to implement the Program and poise the Hanford Site as a leader in environmental stewardship. In order to implement the Hanford Site Sustainability Program, a Sustainability Plan was developed in conjunction with prime contractors, two U.S. Department of Energy (DOE) Offices, and key stakeholders to serve as the framework for measuring progress towards sustainability goals. Based on the review of these metrics and future plans, several activities were initiated to proactively improve performance or provide alternatives for future consideration contingent on available funding. A review of the key metric associated with energy consumption for the Hanford Site in FY 2010 and 2011 indicated an increase over the target reduction of 3 percent annually from a baseline established in FY 2003 as illustrated in Figure 1. This slight increase was attributed primarily from the increased energy demand from the cleanup projects funded by the American Recovery and Reinvestment Act (ARRA) in FY 2010 and 2011. Although it is forecasted that the energy demand will decrease commensurate with the completion of ARRA projects, several major initiatives were launched to improve energy efficiency.

  11. Program Management for Large Scale Engineering Programs

    E-Print Network [OSTI]

    Oehmen, Josef

    The goal of this whitepaper is to summarize the LAI research that applies to program management. The context of most of the research discussed in this whitepaper are large-scale engineering programs, particularly in the ...

  12. Deere & Company Energy Management Program 

    E-Print Network [OSTI]

    Darby, D. F.

    1981-01-01T23:59:59.000Z

    An overview of the Deere & Company Energy Management Program is discussed. A review is made of seven key elements which have contributed to the success of the program. Installed projects and established programs are identified and discussed...

  13. Better Buildings Neighborhood Program Grant Recipient Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Better Buildings Neighborhood Program Grant Recipient Management Handbook Better Buildings Neighborhood Program Grant Recipient Management Handbook Better Buildings Neighborhood...

  14. Ground water protection management program plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    U.S. Department of Energy (DOE) Order 5400.1 requires the establishment of a ground water protection management program to ensure compliance with DOE requirements and applicable federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office was prepared this Ground Water Protection Management Program Plan (ground water protection plan) whose scope and detail reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter III, for special program planning. This ground water protection plan highlights the methods designed to preserve, protect, and monitor ground water resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies technical guidance documents and site-specific documents for the UMTRA Project ground water protection management program. In addition, the plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA Project sites.

  15. Site Manager Y-12 Site Office

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMay 20102 | National NuclearY-12 Site

  16. Nuclear Materials Management Program at the NNSS

    SciTech Connect (OSTI)

    ,

    2012-06-08T23:59:59.000Z

    The Nevada National Security Site (NNSS), formerly the Nevada Test Site, was established in 1951 mainly for weapons testing; because special nuclear materials (SNM) were expended during the tests, a nuclear material management program was not required. That changed in December 2004 with the receipt of Category I SNM for purposes other than weapons testing. At that time, Material Control and Accountability and Nuclear Material Management were a joint laboratory (Los Alamos and Lawrence Livermore) effort with nuclear material management being performed at the laboratories. That changed in March 2006 when the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office appointed sole responsibility to the Management and Operations (M&O) contractor, National Security Technologies, LLC (NSTec). Since 2006 the basic nuclear material management work was completed by a combination of M&O employees and subcontractors, but a true Nuclear Material Management (NMM) Program was not determined to be necessary until recently. With expanding missions and more nuclear material (NM) coming to the NNSS, it became imperative to have an organization to manage these materials; therefore, an NMM Manager was officially appointed by NSTec in 2012. In June 2011 a Gap Analysis and white paper was completed by a subcontractor; this presentation will include highlights from those documents along with our plans to resolve the “gaps” and stand up a functional and compliant NMM Program at the NNSS.

  17. Solid Waste Management Program (Missouri)

    Broader source: Energy.gov [DOE]

    The Solid Waste Management Program in the Department of Natural Resources regulates the management of solid waste in the state of Missouri. A permit is required prior to the construction or...

  18. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30T23:59:59.000Z

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09

  19. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30T23:59:59.000Z

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09.

  20. Solid Waste Management Written Program

    E-Print Network [OSTI]

    Pawlowski, Wojtek

    Solid Waste Management Program Written Program Cornell University 8/28/2012 #12;Solid Waste.................................................................... 4 4.2.1 Compost Solid Waste Treatment Facility.................................................................... 4 4.2.2 Pathological Solid Waste Treatment Facility

  1. Demand Response: Load Management Programs

    E-Print Network [OSTI]

    Simon, J.

    2012-01-01T23:59:59.000Z

    CenterPoint Load Management Programs CATEE Conference October, 2012 Agenda Outline I. General Demand Response Definition II. General Demand Response Program Rules III. CenterPoint Commercial Program IV. CenterPoint Residential Programs... V. Residential Discussion Points Demand Response Definition of load management per energy efficiency rule 25.181: ? Load control activities that result in a reduction in peak demand, or a shifting of energy usage from a peak to an off...

  2. SNL/CA Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2005-09-01T23:59:59.000Z

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program was developed in accordance with Department of Energy (DOE) Order 450.1 and incorporates the elements of the International Standard on Environmental Management Systems, ISO 14001.

  3. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2013-04-01T23:59:59.000Z

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  4. FLUOR HANFORD SAFETY MANAGEMENT PROGRAMS

    SciTech Connect (OSTI)

    GARVIN, L J; JENSEN, M A

    2004-04-13T23:59:59.000Z

    This document summarizes safety management programs used within the scope of the ''Project Hanford Management Contract''. The document has been developed to meet the format and content requirements of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''. This document provides summary descriptions of Fluor Hanford safety management programs, which Fluor Hanford nuclear facilities may reference and incorporate into their safety basis when producing facility- or activity-specific documented safety analyses (DSA). Facility- or activity-specific DSAs will identify any variances to the safety management programs described in this document and any specific attributes of these safety management programs that are important for controlling potentially hazardous conditions. In addition, facility- or activity-specific DSAs may identify unique additions to the safety management programs that are needed to control potentially hazardous conditions.

  5. Electric and hybrid vehicle program site operator program. Quarterly progress report, January 1995--March 1995

    SciTech Connect (OSTI)

    Kiser, D.M.; Brown, H.L.

    1995-08-01T23:59:59.000Z

    The Site Operator Program was initially established by the Department of Energy (DOE) to incorporate the electric vehicle activities dictated by the Electric and Hybrid Vehicle Research, Development and Demonstration Act of 1976. In the ensuing years, the Program has evolved in response to new legislation and interests. The Program currently includes twelve sites located in diverse geographic, metrologic, and metropolitan areas across the United States. Information is shared reciprocally with a thirteenth site, not under Program contract. The vehicles are operator-owned. The Mission Statement of the Site Operator Program includes three major activities: (1) Advancement of electric vehicle technologies; (2) Development of infrastructure elements necessary to support significant electric vehicle use; and (3) Increasing the awareness and acceptance of electric vehicles (EVs) by the public. The current participants in the Site Operator Program are shown. Table 1 indicates the EVs in each of the Site Operator fleets. Table 2 provides baseline information on several EVs currently in use by the Site Operators, or which have evolved to the point that they may be introduced in the near future. The Program is currently managed by personnel of the Electric and Hybrid Vehicle Program at the Idaho National Engineering Laboratory (INEL). The current principal management functions include: Coordination of Site Operator efforts in the areas of public awareness and infrastructure development (program-related meetings, and educational presentations).

  6. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1992-01-10T23:59:59.000Z

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1991 EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1991 are listed in this report.

  7. Vehicle Management Driver Safety Program

    E-Print Network [OSTI]

    Machel, Hans

    Vehicle Management and Driver Safety Program Manual Facilities & Operations / Finance & Administration Version 2 April 2012 #12;© 2012 University of Alberta. #12;The Vehicle Management and Driver of employment. Driver Acknowledgement I have received the University of Alberta, Vehicle Management and Driver

  8. INL Site Executable Plan for Energy and Transportation Fuels Management

    SciTech Connect (OSTI)

    Ernest L. Fossum

    2008-11-01T23:59:59.000Z

    It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

  9. GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION.

    SciTech Connect (OSTI)

    PAQUETTE,D.E.; BENNETT,D.B.; DORSCH,W.R.; GOODE,G.A.; LEE,R.J.; KLAUS,K.; HOWE,R.F.; GEIGER,K.

    2002-05-31T23:59:59.000Z

    THE DEPARTMENT OF ENERGY ORDER 5400.1, GENERAL ENVIRONMENTAL PROTECTION PROGRAM, REQUIRES THE DEVELOPMENT AND IMPLEMENTATION OF A GROUNDWATER PROTECTION PROGRAM. THE BNL GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION PROVIDES AN OVERVIEW OF HOW THE LABORATORY ENSURES THAT PLANS FOR GROUNDWATER PROTECTION, MONITORING, AND RESTORATION ARE FULLY DEFINED, INTEGRATED, AND MANAGED IN A COST EFFECTIVE MANNER THAT IS CONSISTENT WITH FEDERAL, STATE, AND LOCAL REGULATIONS.

  10. Software Quality Assurance Plan for GoldSim Models Supporting the Area 3 and Area 5 Radioactive Waste Management Sites Performance Assessment Program

    SciTech Connect (OSTI)

    Gregory J. Shott, Vefa Yucel

    2007-01-03T23:59:59.000Z

    This Software Quality Assurance Plan (SQAP) applies to the development and maintenance of GoldSim models supporting the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) performance assessments (PAs) and composite analyses (CAs). Two PA models have been approved by the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as of November 2006 for the PA maintenance work undertaken by National Security Technologies, LLC (NSTec). NNSA/NSO asked NSTec to assume the custodianship of the models for future development and maintenance. The models were initially developed by Neptune and Company (N&C).

  11. HANFORD SITE WELDING PROGRAM SUCCESSFULLY PROVIDING A SINGLE SITE FUNCTION FOR USE BY MULTIPLE CONTRACTORS

    SciTech Connect (OSTI)

    CANNELL GR

    2009-11-19T23:59:59.000Z

    The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

  12. Hanford site operator changes management

    SciTech Connect (OSTI)

    NONE

    1994-01-24T23:59:59.000Z

    This article is a brief discussion of management changes at the Westinghouse Hanford Corporation. A. LeMar Trego has relieved Thomas Anderson as president of WHC. This was in response to recent shortcomings in Westinghouse`s management of the environmental restoration and their failure to receive a $10M performance bonus.

  13. The Savannah River Site's groundwater monitoring program

    SciTech Connect (OSTI)

    Not Available

    1991-10-18T23:59:59.000Z

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results.

  14. Federal Energy Management Program (FEMP) Technical Assistance...

    Energy Savers [EERE]

    Federal Energy Management Program (FEMP) Technical Assistance Request Portal User Guide Federal Energy Management Program (FEMP) Technical Assistance Request Portal User Guide...

  15. Environmental Management Science Program Workshop

    SciTech Connect (OSTI)

    None

    1998-07-01T23:59:59.000Z

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  16. The Savannah River Site's groundwater monitoring program

    SciTech Connect (OSTI)

    Not Available

    1991-05-06T23:59:59.000Z

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1990 (July through September) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. All analytical results from third quarter 1990 are listed in this report, which is distributed to all site custodians. One or more analytes exceeded Flag 2 in 87 monitoring well series. Analytes exceeded Flat 2 for the first since 1984 in 14 monitoring well series. In addition to groundwater monitoring, EPD/EMS collected drinking water samples from SRS drinking water systems supplied by wells. The drinking water samples were analyzed for radioactive constituents.

  17. SNL/CA Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2007-04-01T23:59:59.000Z

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004. Elements of the ISO standard overlap with those of Department of Energy (DOE) Order 450.1, thus SNL/CA's EMS program also meets the DOE requirements.

  18. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    SciTech Connect (OSTI)

    Morrison, M.I. [Midwest Technical Inc., Oak Ridge, Tennessee (United States); McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D. [Oak Ridge National Lab., TN (United States)

    1995-02-01T23:59:59.000Z

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections.

  19. Advisory Committee Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-10-22T23:59:59.000Z

    The Manual provides detailed DOE requirements, responsibilities, processes, and procedures for the establishment, operation, and management of advisory committees. Cancels DOE M 510.1-1.

  20. Power Plant Research and Siting Program (Maryland)

    Broader source: Energy.gov [DOE]

    The Power Plant Research and Siting Act of 1971 established the Power Plant Research Program (PPRP) to evaluate electric generation issues in the state and recommend responsible, long-term...

  1. Information Collection Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-10-11T23:59:59.000Z

    This Order sets forth DOE requirements and responsibilities for implementing the information collection management provisions of the Paperwork Reduction Act of 1995 and the Office of Management and Budgets implementing regulation Controlling Paperwork Burdens on the Public, as contained in 5 CFR 1320. No cancellation.

  2. Acquisition Career Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-01-24T23:59:59.000Z

    The order defines requirements and responsibilities for training, certification, and career development programs for the DOE acquisition workforce. Cancels DOE O 361.1A.

  3. Human Capital Management Accountability Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-01T23:59:59.000Z

    The Order establishes requirements, roles and responsibilities for the Human Capital Management Accountability Program (HCMAP) for human resources programs and personnel and ensures that human capital activities are regulatory and procedurally compliant with Federal statutes and Departmental policies. Does not cancel other directives.

  4. Groundwater Protection Management Program

    SciTech Connect (OSTI)

    Wells, D.G.

    1999-10-20T23:59:59.000Z

    This document will be a useful reference for those engaged in groundwater protection and management. This document presents a great deal of detail while still addressing the larger issues.

  5. Implementation Manual Self-Management Programs

    E-Print Network [OSTI]

    Straight, Aaron

    i Implementation Manual Stanford Self-Management Programs 2008* Please note that while this manual is written for the Chronic Disease Self-Management Program (CDSMP) it can also be used for any of the other Stanford small group programs (Diabetes Self- Management, Positive Self-Management Program, Pain Self

  6. Civilian radioactive waste management program plan. Revision 2

    SciTech Connect (OSTI)

    NONE

    1998-07-01T23:59:59.000Z

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  7. Beryllium Program Information - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWP TWPAlumniComplex historianBenefitsProgram Information About Us

  8. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-29T23:59:59.000Z

    This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels Chapters I-III of DOE O 350.1 Chg 4

  9. EPRI's Industrial Energy Management Program

    E-Print Network [OSTI]

    Mergens, E.; Niday, L.

    EPRI's INDUSTRIAL ENERGY MANAGEMENT PROGRAM ED MERGENS MANAGER EPRI's CHEMICALS & PETROLEUM OFFICE HOUSTON, TEXAS ABSTRACT The loss of American industry jobs to foreign competition is made worse by national concerns over fuels combustion... are funded at a level in excess of SlO million annually. By providing technical guidance and sponsoring research and development projects, these Centers and Offices are a key element in EPRI's role of improving the value of electricity to consumers...

  10. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30T23:59:59.000Z

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. This order cancels DOE O 3220.1A, DOE O 3220.4A, DOE O 3220.6A, and DOE O 3309.1A.

  11. Nevada Test Site Resource Management Plan

    SciTech Connect (OSTI)

    NONE

    1998-12-01T23:59:59.000Z

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  12. Information Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30T23:59:59.000Z

    Provides a framework for managing information, information resources, and information technology investment, which supports the operating elements of the Department in the accomplishment of its missions and functions in both an efficient and effective manner and in accordance with Departmental policy. Cancels: DOE 1324.5B, DOE 5900.1A, DOE 1130.8A, DOE 1330.1D, DOE 1410.2, DOE 1450.3A, DOE 1700.1, DOE 1800.1A, DOE 5300.1C

  13. Nevada Test Site Radiation Protection Program

    SciTech Connect (OSTI)

    Radiological Control Managers' Council, Nevada Test Site

    2007-08-09T23:59:59.000Z

    Title 10 Code of Federal Regulations (CFR) 835, 'Occupational Radiation Protection', establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada Test Site (NTS), related (onsite or offsite) DOE National Nuclear Security Administration Nevada Site Office (NNSA/NSO) operations, and environmental restoration offsite projects.

  14. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1991-06-18T23:59:59.000Z

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the fourth quarter of 1990. It includes the analytical data, field data, well activity data, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of analytical and other data, maintenance of the databases containing groundwater monitoring data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  15. Oklahoma Industrial Energy Management Program

    E-Print Network [OSTI]

    Turner, W. C.; Estes, C. B.

    1982-01-01T23:59:59.000Z

    In Oklahoma, industry consumes about 35% of the total energy consumed. While it is true that much work has been done in the larger companies, most small to medium sized companies have yet to undertake a substantial energy management program. Often...

  16. Soils Management, Site Productivity and Forest Nutrition: Nutrient Balance

    E-Print Network [OSTI]

    ;#12;1) principals 2) strategies 3) implementation Sustainable Soil Management: #12;- maintenance of fertility soil management Strategies: #12;Examples of adaptive management models used for achieving sustainableSoils Management, Site Productivity and Forest Nutrition: Nutrient Balance and Availability

  17. Hanford Site Waste Management Units Report

    SciTech Connect (OSTI)

    Not Available

    1991-01-01T23:59:59.000Z

    This Hanford Site Waste Management Units Report (HSWMUR) was originated to provide information responsive to Section 3004(u) of the Hazardous and Solid Waste Amendments (HSWA) of the 1984 United States Code (USC). The report provides a comprehensive inventory of all types of waste management units at the Hanford Site and consists of waste disposal units, including (1) Resource Conservation and Recovery Act of 1976 (RCRA) disposal units, (2) Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) disposal units, (3) unplanned releases, (4) inactive contaminated structure, (5) RCRA treatment and storage units, and (6) other storage areas. Because of the comprehensive nature of this report, the listing of sites is more extensive than required by Section 3004(u) of HSWA. In support of the Hanford RCRA permit, a field was added to designate whether the waste management unit is a solid waste management unit (SWMU). As SWMUs are identified, they will added to the Hanford Waste Information Data System (WIDS), which is the database supporting this report, and added to the report at its next annual update. A quality review of the WIDS was conducted this past year. The review included checking all data against their reference and making appropriate changes, updating the data elements using the most recent references, marking duplicate units for deletion, and addition additional information. 6 refs.

  18. Hanford Site Waste Management Units Report

    SciTech Connect (OSTI)

    Not Available

    1991-01-01T23:59:59.000Z

    This Hanford Site Waste Management Units Report (HSWMUR) was originated to provide information responsive to Section 3004(u) of the Hazardous and Solid Waste Amendments (HSWA) of the 1984 United States Code (USC). The report provides a comprehensive inventory of all types of waste management units at the Hanford Site and consists of waste disposal units, including (1) Resource Conservation and Recovery Act of 1976 (RCRA) disposal units, (2) Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) disposal units, (3) unplanned releases, (4) inactive contaminated structures, (5) RCRA treatment and storage units, and (6) other storage areas. Because of the comprehensive nature of this report, the listing of sites is more extensive than required by Section 3004(u) of HSWA. In support of the Hanford RCRA permit, a field was added to designate whether the waste management unit is a solid waste management unit (SWMU). As SWMUs are identified, they will added to the Hanford Waste Information Data System (WIDS), which is the database supporting this report, and added to the report at its next annual update. A quality review of the WIDS was conducted this past year. The review included checking all data against their reference and making appropriate changes, updating the data elements using the most recent references, marking duplicate units for deletion, and adding additional information. 6 refs.

  19. Current activities handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    none,

    1981-02-27T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified.

  20. Paducah Site Management Plan | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagementOPAM5 Accretion-of-DutiesPROPERTY3-0127 -PotentialSiteManagement

  1. Environmental audit of the Maywood Site: Formerly Utilized Sites Remedial Action Program, Maywood Interim Storage Site vicinity properties

    SciTech Connect (OSTI)

    Not Available

    1990-12-01T23:59:59.000Z

    This report presents the results of the Environmental Audit of the Maywood Site managed by the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Audit was carried out from November 7 through 16, 1990. The Audit Team found overall technical competence and knowledge of management and staff to be excellent. This applies to DOE as well as to Bechtel National, Incorporated (BNI). In particular, there was excellent knowledge of federal, state, and local environmental regulations, as well as analysis for applicability of these regulations to FUSRAP. Project management of the Maywood Site is also excellent. BNI and DOE project staff have made frequent contact with members of the community, and all removal actions and remedial investigation activities have been planned, scheduled, and accomplished with competence and attention to total quality principles. To date, all actions taken for the Maywood Site cleanup have been completed ahead of schedule and on or under budget. Weakness noted include self-assessment efforts by DOE, failure to fully implement DOE Order requirements throughout the program, and some discrepancies in formally documenting and reviewing procedures. 7 figs., 10 tabs.

  2. Daniel Hoag Named Y-12 Site Office Deputy Manager | National...

    National Nuclear Security Administration (NNSA)

    Y-12 Site Office Deputy Manager | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation...

  3. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Not Available

    2009-04-01T23:59:59.000Z

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

  4. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2011-04-01T23:59:59.000Z

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

  5. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2012-03-01T23:59:59.000Z

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

  6. Archives & Records Management Bulletin UW-Madison Records Management Program

    E-Print Network [OSTI]

    Sheridan, Jennifer

    1 Archives & Records Management Bulletin UW-Madison Records Management Program A Periodical Responsibilities and University Records Information technology has effectively made all of us records managers. The Campus Records Review Group and University Records Management Program are concerned and would like

  7. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30T23:59:59.000Z

    This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels DOE O 350.1 Chg 4. The Order is revised to reflect the cancellation of Chapters 1-3 due to the incorporation of these chapters into DOE Order 350.3; reflect organizational changes; delete reference to the DOE Retrospective Rating Insurance Plan, which is no longer available; remove the CRD from Chapter VII.

  8. Waste certification review program at the Savannah River Site

    SciTech Connect (OSTI)

    Faulk, G.W.; Kinney, J.C. [Westinghouse Savannah River Co., Aiken, SC (United States); Knapp, D.C. [Bechtel Savannah River Inc., Aiken, SC (United States); Burdette, T.E. [Science Applications International Corp., Oak Ridge, TN (United States)

    1996-02-01T23:59:59.000Z

    After approving the waste certification programs for 45 generators of low-level radioactive and mixed waste, Westinghouse Savannah River Company (WSRC) moved forward to implement a performance-based approach for assuring that approved waste generators maintain their waste certification programs. WSRC implemented the Waste Certification Review Program, which is comprised of two sitewide programs, waste generator self-assessments and Facility Evaluation Board reviews, integrated with the WSRC Solid Waste Management Department Waste Verification Program Evaluations. The waste generator self-assessments ensure compliance with waste certification requirements, and Facility Evaluation Board reviews provide independent oversight of generators` waste certification programs. Waste verification evaluations by the TSD facilities serve as the foundation of the program by confirming that waste contents and generator performance continue to meet waste acceptance criteria (WSRC 1994) prior to shipment to treatment, storage, and disposal facilities. Construction of the Savannah River Site (SRS) was started by the US Government in 1950. The site covers approximately 300 square miles located along the Savannah River near Aiken, South Carolina. It is operated by the US Department of Energy (DOE). Operations are conducted by managing and operating contractors, including the Westinghouse Savannah River Company (WSRC). Historically, the primary purpose of the SRS was to produce special nuclear materials, primarily plutonium and tritium. In general, low-level radioactive and mixed waste is generated through activities in operations. Presently, 47 SRS facilities generate low-level radioactive and mixed waste. The policies, guidelines, and requirements for managing these wastes are determined by DOE and are reflected in DOE Order 5820.2A (US DOE 1988).

  9. Hanford Site Solid Waste Acceptance Program - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) EnvironmentalGyroSolé(tm) Harmonicbet When yourecovery WasteSiteProgram About Us

  10. MIT System Design and Management Program

    E-Print Network [OSTI]

    de Weck, Olivier L.

    , disseminating, and preserving knowledge, and to working with others to bring this knowledge to bear on the worldMIT System Design and Management Program MIT System Design and Management Program Leadership, innovation, systems thinking #12;MIT System Design and Management Program #12;about MIT The mission of MIT

  11. Energy Management Programs- Monitoring Performance

    E-Print Network [OSTI]

    Pauls, S. P.; Shamy, M. D.

    ENERGY MANAGEMENT PROGRAMS - MONITORING PERFORMANCE Stanley P. Pauls Mustafa D. Shamy Merck & Co., Inc. Rahway, N. J. ABSTRACT of the historical energy consumption records. Energy use standards have been established to Steam Model monitor... energy conservation performance in bulk pharmaceutical plants. The model considers The basic steam model for most industrial process, comfort heating, and fixed loads. operations is made up of the following components: As the oil crisis developed...

  12. The Savannah River Site`s Groundwater Monitoring Program, third quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-12-31T23:59:59.000Z

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During third quarter 1989 (July--September), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the third quarter is presented in the Flagging Criteria section of this document. All analytical results from third quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  13. The Savannah River Site`s Groundwater Monitoring Program, first quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-12-31T23:59:59.000Z

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During first quarter 1989 (January--March), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the first quarter is presented in the Flagging Criteria section of this document. All analytical results from first quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  14. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1989

    SciTech Connect (OSTI)

    Not Available

    1989-12-31T23:59:59.000Z

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  15. The Savannah River Site`s Groundwater Monitoring Program, second quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-12-31T23:59:59.000Z

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  16. Home audit program: management manual

    SciTech Connect (OSTI)

    Not Available

    1980-09-01T23:59:59.000Z

    Many public power systems have initiated home energy audit programs in response to the requests of their consumers. The manual provides smaller public power systems with the information and specific skills needed to design and develop a program of residential energy audits. The program is based on the following precepts: locally owned public systems are the best, and in many cases the only agencies available to organize and coordinate energy conservation programs in many smaller communities; consumers' rights to energy conservation information and assistance should not hinge on the size of the utility that serves them; in the short run, public power systems of all sizes should offer residential energy conservation assistance to their consumers, because such assistance is desirable, necessary, and in the public interest; and in the long run, such programs will complement national energy goals and will produce economic benefits for both consumers and the public power system. A detailed description of home audit program planning, organization, and management are given. (MCW)

  17. Deere and Company Energy Management Program

    E-Print Network [OSTI]

    Boyd, P. M.

    1980-01-01T23:59:59.000Z

    An overview of the Deere & Company energy management program is discussed. A review is made of seven key elements which have contributed to the success of the program. Installed projects and established programs are identified and discussed...

  18. Deere and Company Energy Management Program 

    E-Print Network [OSTI]

    Boyd, P. M.

    1980-01-01T23:59:59.000Z

    An overview of the Deere & Company energy management program is discussed. A review is made of seven key elements which have contributed to the success of the program. Installed projects and established programs are identified and discussed...

  19. Nevada National Security Site Radiation Protection Program

    SciTech Connect (OSTI)

    none,

    2013-04-30T23:59:59.000Z

    Title 10 Code of Federal Regulations (CFR) Part 835, “Occupational Radiation Protection,” establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada National Security Site (NNSS), related (on-site or off-site) U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) operations, and environmental restoration off-site projects. This RPP section consists of general statements that are applicable to the NNSS as a whole. The RPP also includes a series of appendices which provide supporting detail for the associated NNSS Tennant Organizations (TOs). Appendix H, “Compliance Demonstration Table,” contains a cross-walk for the implementation of 10 CFR 835 requirements. This RPP does not contain any exemptions from the established 10 CFR 835 requirements. The RSPC and TOs are fully compliant with 10 CFR 835 and no additional funding is required in order to meet RPP commitments. No new programs or activities are needed to meet 10 CFR 835 requirements and there are no anticipated impacts to programs or activities that are not included in the RPP. There are no known constraints to implementing the RPP. No guides or technical standards are adopted in this RPP as a means to meet the requirements of 10 CFR 835.

  20. Benefits of On-Site Management of Environmental Restoration Wastes

    SciTech Connect (OSTI)

    Irwin, Michael J. ,P.E.; Wood, Craig, R.E.M.; Kwiecinski, Daniel, P.E.; Alanis, Saul

    2003-02-27T23:59:59.000Z

    As Sandia National Laboratories/New Mexico (SNL/NM) began assessing options under which to conduct the remediation of environmental restoration sites, it became clear that the standard routes for permanent disposal of waste contaminated with hazardous materials would be difficult. Publicly, local citizens' groups resisted the idea of large volumes of hazardous waste being transported through their communities. Regulations for the off-site disposal are complicated due to the nature of the environmental restoration waste, which included elevated tritium levels. Waste generated from environmental restoration at SNL/NM included debris and soils contaminated with a variety of constituents. Operationally, disposal of environmental restoration waste was difficult because of the everchanging types of waste generated during site remediation. As an alternative to standard hazardous waste disposal, SNL/NM proposed and received regulatory approval to construct a Corrective Action Management Unit (CAMU). By containing the remediation wastes on-site, SNL/NM's Environmental Restoration (ER) Program managed to eliminate transportation concerns from the public, worked with regulatory agencies to develop a safe, permanent disposal, and modified the waste disposal procedures to accommodate operational changes. SNL/NM accomplished the task and saved approximately $200 million over the life of the CAMU project, as compared to off-site disposal options.

  1. The Savannah River Site's Groundwater Monitoring Program, third quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01T23:59:59.000Z

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During third quarter 1989 (July--September), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the third quarter is presented in the Flagging Criteria section of this document. All analytical results from third quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  2. The Savannah River Site's Groundwater Monitoring Program, first quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01T23:59:59.000Z

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During first quarter 1989 (January--March), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the first quarter is presented in the Flagging Criteria section of this document. All analytical results from first quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  3. The Savannah River Site's Groundwater Monitoring Program, second quarter 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01T23:59:59.000Z

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  4. Electric and Hybrid Vehicle Program; Site Operator Program

    SciTech Connect (OSTI)

    Warren, J.F.

    1992-01-01T23:59:59.000Z

    Activities during the first quarter centered around integrating the new participants into the program. A meeting of the Site Operators, in conjunction with the first meeting of the Electric Vehicle Users Task Force, was held in October. A second meeting of the Task Force was held in December. During these meetings the new contractual requirements were explained to the participants. The Site Operator Data Base was distributed and explained. The Site Operators will begin using the data base in December 1991 and will supply the operating and maintenance data to the INEL on a monthly basis. The Operators requested that they be able to have access to the data of the other Operators and it was agreed that they would be provided this on floppy disk monthly from the INEL. Presentations were made to the DOE sponsored Automotive Technology Development-Contractors Coordination Meeting in October. An overview of the program was given by EG G. Representatives from Arizona Public Service, Texas A M University, and York Technical College provided details of their programs and the results and future goals. Work was begun on commercializing the Versatile Data Acquisition System (VDAS). A Scope of Work has been written for a Cooperative Research and Development Agreement (CRADA) to be submitted to the USABC. If implemented, the CRADA will provide funds for the development and commercialization of the VDAS. Participants in the Site Operator Program will test prototypes of the system within their fleets, making the data available to the USABC and other interested organizations. The USABC will provide recommendations on the data to be collected. Major activities by the majority of the Operators were involved with the continued operation and demonstration of existing vehicles. In addition, several of the operators were involved in identifying and locating vehicles to be added to their fleets. A list of the vehicles in each Site Operator fleet is included as Appendix A to this report.

  5. Electric and hybrid vehicle program; Site Operator Program

    SciTech Connect (OSTI)

    Warren, J.F.

    1992-05-01T23:59:59.000Z

    Activities during the second quarter included the second meeting of the Site Operators in Phoenix, AZ in late April. The meeting was held in conjunction with the Solar and Electric 500 Race activities. Delivery of vehicles ordered previously has begun, although two of the operators are experiencing some delays in receiving their vehicles. Public demonstration activities continue, with an apparent increasing level of awareness and interest being displayed by the public. Initial problems with the Site Operator Database have been corrected and revised copies of the program have been supplied to the Program participants. Operating and Maintenance data is being supplied and submitted to INEL on a monthly basis. Interest in the Site Operator Program is being reflected in requests for information from several organizations from across the country, representing a wide diversity of interests. These organizations have been referred to existing Site Operators with the explanation that the program will not be adding new participants, but that most of the existing organizations are willing to work with other groups. The exception to this was the addition of Potomac Electric Power Company (PEPCO) to the program. PEPCO has been awarded a subcontract to operate and maintain the DOE owned G-Van and Escort located in Washington, DC. They will provide data on these vehicles, as well as a Solectria Force which PEPCO has purchased. The Task Force intends to be actively involved in the infrastructure development in a wide range of areas. These include, among others, personnel development, safety, charging, and servicing. Work continues in these areas. York Technical College (YORK) has completed the draft outline for the EV Technician course. This is being circulated to organizations around the country for comments. Kansas State University (KSU) is working with a private sector company to develop a energy dispensing meter for opportunity charging in public areas.

  6. Environmental management 1994. Progress and plans of the environmental restoration and waste management program

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    The Department of Energy currently faces one of the largest environmental challenges in the world. The Department`s Environmental Restoration and Waste Management program is responsible for identifying and reducing risks and managing waste at 137 sites in 34 States and territories where nuclear energy or weapons research and production resulted in radioactive, hazardous, and mixed waste contamination. The number of sites continues to grow as facilities are transferred to be cleaned up and closed down. The program`s main challenge is to balance technical and financial realities with the public`s expectations and develop a strategy that enables the Department to meet its commitments to the American people. This document provides a closer look at what is being done around the country. Included are detailed discussions of the largest sites in the region, followed by site activities organized by state, and a summary of activities at FUSRAP and UMTRA sites in the region.

  7. Lessons learned -- a comparison of the proposed on-site waste management facilities at the various Department of Energy sites

    SciTech Connect (OSTI)

    Ciocco, J. [Dept. of Energy, Germantown, MD (United States); Singh, D. [Booz Allen and Hamilton, Germantown, MD (United States); Survochak, S. [DOE RFETS, Golden, CO (United States); Elo, M. [Burns and Roe, Germantown, MD (United States)

    1996-12-31T23:59:59.000Z

    The Department of Energy Sites (DOE) are faced with the challenge of managing several categories of waste generated from past or future cleanup activities, such as 11(e)2 byproduct material, low-level radioactive (LL), low-level radioactive mixed (LLM), transuranic (TRU), high level radioactive (HL), and hazardous waste (HW). DOE must ensure safe and efficient management of these wastes while complying with all applicable federal and state laws. Proposed waste management strategies for the EM-40 Environmental Restoration (ER) program at these sites indicate that on-site disposal is becoming a viable option. For purposes of this paper, on-site disposal cells managed by the EM-40 program at Hanford, Weldon Spring, Fernald Environmental Management Project (FEMP) and Rocky Flats were compared. Programmatic aspects and design features were evaluated to determine what comparisons can be made, and to identify benefits lessons learned that may be applicable to other sites. Based on comparative analysis, it can be concluded that the DOE EM-40 disposal cells are very unique. Stakeholders played a major role in the decision to locate the various DOE on-site disposal facilities. The disposal cells will be used to manage 11(e)2 by-product materials, LL, LLM, and/or HLW. The analysis further suggests that the design criteria are comparable. Lessons learned relative to the public involvement activities at Weldon Spring, and the design approach at Hanford should be considered when planning future on-site disposal facilities at DOE sites. Further, a detailed analysis of progress made at Hanford should be evaluated for application at sites such as Rocky Flats that are currently planning on-site disposal facilities.

  8. EL Program: Sustainable Engineered Materials Program Manager: Aaron Forster, Division

    E-Print Network [OSTI]

    1 EL Program: Sustainable Engineered Materials Program Manager: Aaron Forster, Division Associate Program Manager: None Strategic Goal: Sustainable and Energy-Effic Infrastructure 731 ient Manufacturing, Materials, and Date Prepared: May 31, 2013 Summary: The standards used to classify and specify materials

  9. IT PROJECT MANAGEMENT PROGRAM A ten-week program covering best practices in IT project management

    E-Print Network [OSTI]

    Schaefer, Marcus

    with managing and working with people such as team composition and leadership, conflict resolution and politics Management Program are expected to do a considerable amount of work outside of class. StudentsIT PROJECT MANAGEMENT PROGRAM A ten-week program covering best practices in IT project management

  10. Hazard Communication Site Specific Information Sheet Hazard Communication Program (HCP)

    E-Print Network [OSTI]

    Slatton, Clint

    Hazard Communication Site Specific Information Sheet Hazard Communication Program (HCP) Site Specific Information The responsible party for a unit/area should complete this section to make the Hazard Communication Program site specific. The responsible party will ensure that the Hazard Communication Program

  11. Blood Management Using Approximate Linear Programming

    E-Print Network [OSTI]

    Shenoy, Prashant

    Blood Management Using Approximate Linear Programming Marek Petrik and Shlomo Zilberstein January 13th, 2009 Marek Petrik and Shlomo Zilberstein () Blood Management Using Approximate Linear ProgrammingJanuary 13th, 2009 1 / 36 #12;Blood Inventory Management Problem Regional blood banks: Aggregate

  12. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter 1988

    SciTech Connect (OSTI)

    Not Available

    1989-12-31T23:59:59.000Z

    The Environmental Monitoring Group of the Health Protection Department administers the Savannah River Site`s Groundwater Monitoring Program. During fourth quarter 1988 (October--December), routine sampling of monitoring wells and drinking water locations was performed. The drinking water samples were collected from Savannah River Site (SRS) drinking water systems supplied by wells. Two sets of flagging criteria were established in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. The drinking water samples were analyzed for radioactive constituents.

  13. PROGRAM MANAGER CENTER FOR NANOTECHNOLOGY IN SOCIETY

    E-Print Network [OSTI]

    Colorado at Boulder, University of

    PROGRAM MANAGER CENTER FOR NANOTECHNOLOGY IN SOCIETY AT ARIZONA STATE UNIVERSITY The Center for Nanotechnology in Society at Arizona State University (CNS-ASU) seeks a Program Manager to organize and coordinate activities, programs, and projects for the Center for Nanotechnology in Society (CNS) at Arizona

  14. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    SciTech Connect (OSTI)

    Not Available

    1991-08-01T23:59:59.000Z

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  15. Environmental Management 1995: Progress and plans of the Environmental Management Program

    SciTech Connect (OSTI)

    NONE

    1995-02-01T23:59:59.000Z

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  16. Hanford performance evaluation program for Hanford site analytical services

    SciTech Connect (OSTI)

    Markel, L.P.

    1995-09-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) Order 5700.6C, Quality Assurance, and Title 10 of the Code of Federal Regulations, Part 830.120, Quality Assurance Requirements, states that it is the responsibility of DOE contractors to ensure that ``quality is achieved and maintained by those who have been assigned the responsibility for performing the work.`` Hanford Analytical Services Quality Assurance Plan (HASQAP) is designed to meet the needs of the Richland Operations Office (RL) for maintaining a consistent level of quality for the analytical chemistry services provided by contractor and commmercial analytical laboratory operations. Therefore, services supporting Hanford environmental monitoring, environmental restoration, and waste management analytical services shall meet appropriate quality standards. This performance evaluation program will monitor the quality standards of all analytical laboratories supporting the Hanforad Site including on-site and off-site laboratories. The monitoring and evaluation of laboratory performance can be completed by the use of several tools. This program will discuss the tools that will be utilized for laboratory performance evaluations. Revision 0 will primarily focus on presently available programs using readily available performance evaluation materials provided by DOE, EPA or commercial sources. Discussion of project specific PE materials and evaluations will be described in section 9.0 and Appendix A.

  17. ENVIRONMENTAL PROGRAM INFORMATION 1997 BNL Site Environmental Report 3 -1

    E-Print Network [OSTI]

    ENVIRONMENTAL PROGRAM INFORMATION 1997 BNL Site Environmental Report 3 - 1 Chapter 3 ENVIRONMENTAL PROGRAM INFORMATION 3.1 Environmental Program Elements Brookhaven National Laboratory is committed to environmental compliance and accountability. To evaluate BNL's impact on the environment, the Laboratory

  18. Rotational Programs General Electric Operations Management Leadership Program, Edison Engineering

    E-Print Network [OSTI]

    ://nestlepurinacareers.com/CollegeStudents/ManagementTraineeOpportunities.aspx Praxair Commercial Leadership Development Program http://www.praxair.com/praxair.nsf/0/0AC4813647AD

  19. LLNL Site 200 Risk Management PlanAgust 2008

    SciTech Connect (OSTI)

    Pinkston, D; Johnson, M

    2008-07-30T23:59:59.000Z

    It is the Lawrence Livermore National Laboratory's (LLNL) policy to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage using the Integrated Safety Management System. The environment, safety, and health are to take priority in the planning and execution of work activities at the Laboratory. Furthermore, it is the policy of LLNL to comply with applicable ES&H laws, regulations, and requirements (LLNL Environment, Safety and Health Manual, Document 1.2, ES&H Policies of LLNL). The program and policies that improve LLNL's ability to prevent or mitigate accidental releases are described in the LLNL Environment, Health, and Safety Manual that is available to the public. The laboratory uses an emergency management system known as the Incident Command System, in accordance with the California Standardized Emergency Management System (SEMS) to respond to Operational Emergencies and to mitigate consequences resulting from them. Operational Emergencies are defined as unplanned, significant events or conditions that require time-urgent response from outside the immediate area of the incident that could seriously impact the safety or security of the public, LLNL's employees, its facilities, or the environment. The Emergency Plan contains LLNL's Operational Emergency response policies, commitments, and institutional responsibilities for managing and recovering from emergencies. It is not possible to list in the Emergency Plan all events that could occur during any given emergency situation. However, a combination of hazard assessments, an effective Emergency Plan, and Emergency Plan Implementing Procedures (EPIPs) can provide the framework for responses to postulated emergency situations. Revision 7, 2004 of the above mentioned LLNL Emergency Plan is available to the public. The most recent revision of the LLNL Emergency Plan LLNL-AM-402556, Revision 11, March 2008, has been included as an appendix to the RMP Supplemental Information document. LLNL Site 200 is a research and development laboratory with infrastructure necessary to support its operations and personnel. Research and development activities at LLNL are focused on stockpile stewardship; achieving robust and vital scientific, engineering, and manufacturing capability; inertial confinement fusion; laser technology; materials and process science; computational and information sciences; basic sciences; engineering sciences; and biological sciences. Based upon CalARP Program regulations, guidance found in California Accidental Release Prevention Program (CalARP) Administering Guidance, Chapter 1, a review of facility specific documents, accident analyses summarized in this document & detailed in the LLNL Site 200 RMP Supporting Information document, LLNL has determined that each process meeting the CalARP threshold criteria meets the requirements for CalARP Program Level 1. In accordance with CalARP regulations, LLNL considers the natural segmentation of processes at Site 200 to be on a building basis and therefore consideration of inventory should be on a building basis rather than a 'site-wide' basis. Only those materials identified as equal to as or greater than the threshold quantities for the CalARP program on a building (process) level are reflected in this document. As such, materials and quantities reported in this document on a building (process) level will vary from materials and quantities reported in the LLNL Hazardous Materials Business Plan, Acutely Hazardous Material Registration Form on a site-wide level. For each process involving regulated quantities of lithium hydride, worst case accident analysis shows that the toxic endpoint lies within the site boundaries. These analyses document that the nearest public receptor is beyond the distance to a toxic or flammable endpoint. Refer to the LLNL Site 200 RMP Supporting Information document for a more detailed explanation of the worst case accident analyses for these processes. For the process involvin

  20. Solid Waste Management Program (South Dakota)

    Broader source: Energy.gov [DOE]

    South Dakota's Solid Waste Management Program offers loans and grants for solid waste disposal, recycling, and waste tire projects. Funds are available for private or public projects, and...

  1. Learning Curve Management in Educational Programming Environments

    E-Print Network [OSTI]

    Goldman, Kenneth J.

    Learning Curve Management in Educational Programming Environments Benjamin H. Brinckerhoff Computer programmers are best served by integrated development environments that adapt to their growing sophistication programming environments. We provide pedagogical justification for each goal, describe possible supporting

  2. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26T23:59:59.000Z

    Establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Cancels: DOE N 473.9 and DOE M 470.1-1

  3. Management of Decommissioning on a Multi-Facility Site

    SciTech Connect (OSTI)

    Laraia, Michele; McIntyre, Peter; Visagie, Abrie [IAEA, Vienna and NECSA (South Africa)

    2008-01-15T23:59:59.000Z

    The management of the decommissioning of multi-facility sites may be inadequate or inappropriate if based on approaches and strategies developed for sites consisting of only a single facility. The varied nature of activities undertaken, their interfaces and their interdependencies are likely to complicate the management of decommissioning. These issues can be exacerbated where some facilities are entering the decommissioning phase while others are still operational or even new facilities are being built. Multi-facility sites are not uncommon worldwide but perhaps insufficient attention has been paid to optimizing the overall site decommissioning in the context of the entire life cycle of facilities. Decommissioning management arrangements need to be established taking a view across the whole site. A site-wide decommissioning management system is required. This should include a project evaluation and approval process and specific arrangements to manage identified interfaces and interdependencies. A group should be created to manage decommissioning across the site, ensuring adequate and consistent practices in accordance with the management system. Decommissioning management should be aimed at the entire life cycle of facilities. In the case of multi facility sites, the process becomes more complex and decommissioning management arrangements need to be established with a view to the whole site. A site decommissioning management system, a group that is responsible for decommissioning on site, a site project evaluation and approval process and specific arrangements to manage the identified interfaces are key areas of a site decommissioning management structure that need to be addressed to ensure adequate and consistent decommissioning practices. A decommissioning strategy based on single facilities in a sequential manner is deemed inadequate.

  4. Pennsylvania Act 38/Nutrient Management Program/Technical Manual January 2013

    E-Print Network [OSTI]

    Guiltinan, Mark

    with the Supplement 15 materials on the PA Nutrient Management Program web site: httpPennsylvania Act 38/Nutrient Management Program/Technical Manual January 2013 Supplement 15 Waiver, pond or reservoir required by the Nutrient Management Act be waived for the construction of a manure

  5. Technitium Management at the Hanford Site

    SciTech Connect (OSTI)

    Robbins, Rebecca A.

    2013-08-15T23:59:59.000Z

    Long Abstract. Full Text. The Hanford tank waste contains approx 26,000 Ci of technetium-99 (Tc-99), the majority of which is in the supernate fraction. Tc-99 is a long-lived radionuclide with a half-life of approx 212,000 years and, in its predominant pertechnetate (TcO{sub 4}) form, is highly soluble and very mobile in the vadose zone and ultimately the groundwater. Tc-99 is identified as the major dose contributor (in groundwater) by past Hanford site performance assessments and therefore considered a key radionuclide of concern at Hanford. The United States Department of Energy (DOE) River Protection Project's (RPP) long-term Tc-99 management strategy is to immobilize the Tc-99 in a waste form that will retain the Tc-99 for many thousands of years. To achieve this, the RPP flowsheet will immobilize the majority of the Tc-99 as a vitrified low-activity waste product that will be ultimately disposed on site in the Integrated Disposal Facility. The Tc-99 will be released gradually from the glass at very low rates such that the groundwater concentrations at any point in time would be substantially below regulatory limits.The liquid secondary waste will be immobilized in a low-temperature matrix (cast stone) and the solid secondary waste will be stabilized using grout. Although the Tc-99 that is immobilized in glass will meet the release rate for disposal in IDF, a proportion is driven into the secondary waste stream that will not be vitrified and therefore presents a disposal risk. If a portion of the Tc-99 were to be removed from the Hanford waste inventory and disposed off-site, (e.g., as HLW), it could lessen a major constraint on LAW waste form performance, i.e., the requirement to retain Tc-99 over thousands of years and have a positive impact on the IDF Performance Assessment. There are several technologies available at various stages of technical maturity that can be employed for Tc-99 removal. The choice of technology and the associated efficacy of the technology are dependent on the chemical fonn of the technetium in the waste, the removal location in the tlowsheet. and the ultimate disposition path chosen for the technetium product. This paper will discuss the current plans for the management of the technetium present in the Hanford tank waste. It will present the risks associated with processing technetium in the current treatment flowsheet and present potential mitigation opportunities, the status of available technetium removal technologies, the chemical speciation of technetium in the tank waste, and the available disposition paths and waste forms for technetium containing streams.

  6. Iowa state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    None

    1981-02-09T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  7. California state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    none,

    1981-02-09T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  8. Pennsylvania state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    none,

    1980-12-31T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  9. Massachusetts state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    None

    1981-02-09T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  10. Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Flynn, N.C. Bechtel Jacobs

    2008-04-21T23:59:59.000Z

    The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable waste management practices. The HASP is written to make use of past experience and best management practices to eliminate or minimize hazards to workers or the environment from events such as fires, falls, mechanical hazards, or any unplanned release to the environment.

  11. Nevada National Security Site Groundwater Program

    ScienceCinema (OSTI)

    None

    2014-10-28T23:59:59.000Z

    From 1951 to 1992, the Unites States government conducted 828 underground nuclear tests at the Nevada National Security Site. About one-third of these tests occurred near, below or within the water table - the very top portion of the groundwater layer where rock and soil are completely saturated with water. As a result, some groundwater was contaminated. The U.S. Department of Energy (DOE) began exploring the effects of groundwater contamination in the 1970s. Though contamination from underground testing has never been detected on public land, the DOE was committed to developing an advanced, reliable monitoring network that ensures the long-term protection of the public. An intensive groundwater investigation program was launched in 1989.

  12. The Savannah River Site`s Groundwater Monitoring Program. Second quarter, 1991

    SciTech Connect (OSTI)

    Not Available

    1992-01-10T23:59:59.000Z

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1991 EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1991 are listed in this report.

  13. The Savannah River Site`s Groundwater Monitoring Program, second quarter 1990

    SciTech Connect (OSTI)

    Not Available

    1991-02-07T23:59:59.000Z

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1990 (April through June) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1990 are listed in this report.

  14. Epi Bio 305 Data Management and Programming

    E-Print Network [OSTI]

    Chisholm, Rex L.

    is to prepare students for computer-based data management, statistical data processing, and programming using SAS systems. There will also be a brief introduction to other statistical packages including R (whichEpi Bio 305 Data Management and Programming 1.0 Credit Fall 2011 (September 20-December 06, 2011

  15. Federal government information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    Not Available

    1980-12-31T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations.

  16. COLORADO SCHOOL OF MINES PERFORMANCE MANAGEMENT PROGRAM

    E-Print Network [OSTI]

    , managers, and other affected parties, · Emphasizes planning, management, and evaluation of employee1 COLORADO SCHOOL OF MINES PERFORMANCE MANAGEMENT PROGRAM Revised October 1, 2008 I. HISTORY Since salaries were adjusted based on prevailing wages as determined by a salary survey, with merit increases

  17. General Counsel`s office FY 1995 site support program plan WBS 6.10.5

    SciTech Connect (OSTI)

    Moreno, S.R.

    1994-09-01T23:59:59.000Z

    The General Counsel`s office provides legal counsel to all levels of WHC management; administers the intellectual property program; coordinates all WHC investigative activity and supports WHC activities to ensure compliance with all applicable federal, state, and local laws, DOE directives, contractual provisions, and other requirements. In so doing, the Office of General Counsel supports the Hanford site mission of transforming the Hanford site into an environmentally attractive and economically sustainable community. This document briefs the FY95 site support plan.

  18. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-03-24T23:59:59.000Z

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation.

  19. Nuclear Materials Stewardship Within the DOE Environmental Management Program

    SciTech Connect (OSTI)

    Bilyeu, J. D.; Kiess, T. E.; Gates, M. L.

    2002-02-26T23:59:59.000Z

    The Department of Energy (DOE) Environmental Management (EM) Program has made significant progress in planning disposition of its excess nuclear materials and has recently completed several noteworthy studies. Since establishment in 1997, the EM Nuclear Material Stewardship Program has developed disposition plans for excess nuclear materials to support facility deactivation. All nuclear materials have been removed from the Miamisburg Environmental Management Project (Mound), and disposition planning is nearing completion for the Fernald Environmental Management Project and the Rocky Flats Environmental Technology Site. Only a few issues remain for materials at the Hanford and Idaho sites. Recent trade studies include the Savannah River Site Canyons Nuclear Materials Identification Study, a Cesium/Strontium Management Alternatives Trade Study, a Liquid Technical Standards Trade Study, an Irradiated Beryllium Reflectors with Tritium study, a Special Performance Assessment Required Trade Study, a Neutron Source Trade Study, and development of discard criteria for uranium. A Small Sites Workshop was also held. Potential and planned future activities include updating the Plutonium-239 storage study, developing additional packaging standards, developing a Nuclear Material Disposition Handbook, determining how to recover or dispose of Pu-244 and U-233, and working with additional sites to define disposition plans for their nuclear materials.

  20. ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM AT POTENTIAL OTEC SITES

    E-Print Network [OSTI]

    Wilde, P.

    2010-01-01T23:59:59.000Z

    Thermal Energy Conversion (OTEC) program preoperational testand biomass distribution at potential OTEC sites.6th OTEC conference, Washington, D.C. Payne, S.F. 1979. The

  1. Hanford Site Solid (Radioactive and Hazardous) Waste Program...

    Office of Environmental Management (EM)

    Office 2 3 TITLE: 4 Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact 5 Statement, Richland, Benton County, Washington (DOE...

  2. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    SciTech Connect (OSTI)

    NONE

    2000-01-01T23:59:59.000Z

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  3. Oklahoma Industrial Energy Management Program 

    E-Print Network [OSTI]

    Estes, C. B.; Turner, W. C.

    1980-01-01T23:59:59.000Z

    usage continues to rise. With this informa tion, Oklahoma embarked upon a program to help indus try (particularly small to medium sized ones) meet the challenge. Program Objectives The primary objective of the program can be stated simply as: "To... for the country and necessary for her to be competitive in the International marketplace. PROGRAM DESCRIPTION The first step was to develop a symbol that year tenure of the.program. The conferences have concentrated on the industrialized areas of Tulsa...

  4. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01T23:59:59.000Z

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  5. Missouri State information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    none,

    1980-12-31T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

  6. Fernald Environmental Management Project 1995 site environmental report

    SciTech Connect (OSTI)

    NONE

    1996-06-01T23:59:59.000Z

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  7. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    SciTech Connect (OSTI)

    Early, T.O.

    1994-05-01T23:59:59.000Z

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  8. 2014 Construction Management Program Information The UNLV Construction Management program is accredited by the American Council for

    E-Print Network [OSTI]

    Walker, Lawrence R.

    2014 Construction Management Program Information The UNLV Construction Management program is accredited by the American Council for Construction Education (ACCE). Our most recent accreditation visit this information for the UNLV Construction Management program. If you have questions about the information

  9. Program & Project Management For The Acquisition Of Capital Assets...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets Project Assessment and Reporting...

  10. Best Management Practice #2: Information and Education Programs...

    Office of Environmental Management (EM)

    Water Use Reduction Best Management Practice 2: Information and Education Programs Best Management Practice 2: Information and Education Programs Educating users about water...

  11. ENERGY STAR Portfolio Manager and Utility Benchmarking Programs...

    Energy Savers [EERE]

    ENERGY STAR Portfolio Manager and Utility Benchmarking Programs: Effectiveness as a Conduit to Utility Energy Efficiency Programs ENERGY STAR Portfolio Manager and Utility...

  12. Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

    SciTech Connect (OSTI)

    Clayton, Christopher [U.S. Department of Energy Office of Legacy Management, Washington, DC (United States); Kothari, Vijendra [U.S. Department of Energy Office of Legacy Management, Morgantown, West Virginia (United States); Starr, Ken [U.S. Department of Energy Office of Legacy Management, Westminster, Colorado (United States); Gillespie, Joey; Widdop, Michael [S.M. Stoller Corporation, Contractor for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado (United States)

    2012-07-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS and M) of remediated FUSRAP sites. DOE LTS and M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS and M. Over the life of the FUSRAP program from 1974 to the present, DOE's primary mission and responsibility has been to ensure that FUSRAP sites remain protective of human health and the environment. In fulfilling this mission, the DOE program includes the following key elements: eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close communication stakeholders as well as state and federal regulators. DOE programs are designed to preserve and present the information that future stewards and stakeholders will need to maintain site remedies and knowledge. (authors)

  13. Hazardous Waste Facility Siting Program (Maryland)

    Broader source: Energy.gov [DOE]

    The Hazardous Waste Facilities Siting Board is responsible for overseeing the siting of hazardous waste facilities in Maryland, and will treat hazardous waste facilities separately from low-level...

  14. The Savannah River Site`s groundwater monitoring program. First quarter 1991

    SciTech Connect (OSTI)

    Not Available

    1991-10-18T23:59:59.000Z

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program`s activities and rationale, and serves as an official document of the analytical results.

  15. The Savannah River Site's Groundwater Monitoring Program, second quarter 1990

    SciTech Connect (OSTI)

    Not Available

    1991-02-07T23:59:59.000Z

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1990 (April through June) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1990 are listed in this report.

  16. Puget Sound Energy- Resource Conservation Manager Program

    Broader source: Energy.gov [DOE]

    Puget Sound Energy's (PSE) Resource Conservation Manager Program (RCM) provides funding and support to customers who hire a RCM. The role of an RCM is to increase efficiency by focusing on...

  17. Engineering Capabilities Full Lifecycle Program Management

    E-Print Network [OSTI]

    Mojzsis, Stephen J.

    Engineering Capabilities Full Lifecycle Program Management-loopandprecisionclosed-loopcontrol Flight Software · Embeddedsystemstocontrolflightinstrumentsandspacecraft · Groundsystemssuchas · Vacuumandthermalenvironmentaltestingfacilities LASP specializes in the design and development of flight instruments and spacecraft, with a focus

  18. HATCHERY AND GENETIC MANAGEMENT PLAN Hatchery Program

    E-Print Network [OSTI]

    HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Hatchery Program: Species or Hatchery Stock: Agency-Arriving Summer/Fall Chinook 97 Table B.5 Tribal Incidental Take Thresholds for ESA-Listed 98 Upper Columbia River

  19. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26T23:59:59.000Z

    The manual establishes program planning and management requirements for the Departments Safeguards and Security. Chg 1, dated 3-7-06 Cancels DOE N 473.9, DOE M 470.1-1 Chg 2.

  20. Engineering Capabilities Full Lifecycle Program Management

    E-Print Network [OSTI]

    Mojzsis, Stephen J.

    Mechanical and Thermal Engineering · Opticalandelectromagneticfieldsinstrumentdesign, analysis,andtest · One-changing technologies. Mechanical and Thermal Engineering Calibration and Test Systems Engineering ElectricalEngineering Capabilities Full Lifecycle Program Management

  1. Environmental Management Science Program Workshop. Proceedings

    SciTech Connect (OSTI)

    None

    1998-07-01T23:59:59.000Z

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  2. Journey to the Nevada Test Site Radioactive Waste Management Complex

    ScienceCinema (OSTI)

    None

    2014-10-28T23:59:59.000Z

    Journey to the Nevada Test Site Radioactive Waste Management Complex begins with a global to regional perspective regarding the location of low-level and mixed low-level waste disposal at the Nevada Test Site. For decades, the Nevada National Security Site (NNSS) has served as a vital disposal resource in the nation-wide cleanup of former nuclear research and testing facilities. State-of-the-art waste management sites at the NNSS offer a safe, permanent disposal option for U.S. Department of Energy/U.S. Department of Defense facilities generating cleanup-related radioactive waste.

  3. The Savannah River Site`s groundwater monitoring program. Third quarter 1990

    SciTech Connect (OSTI)

    Not Available

    1991-05-06T23:59:59.000Z

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1990 (July through September) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. All analytical results from third quarter 1990 are listed in this report, which is distributed to all site custodians. One or more analytes exceeded Flag 2 in 87 monitoring well series. Analytes exceeded Flat 2 for the first since 1984 in 14 monitoring well series. In addition to groundwater monitoring, EPD/EMS collected drinking water samples from SRS drinking water systems supplied by wells. The drinking water samples were analyzed for radioactive constituents.

  4. Performance Auditing of Energy Management Programs 

    E-Print Network [OSTI]

    White, J. A.

    1988-01-01T23:59:59.000Z

    With the oil crisis of the 1970's, energy management programs became important to both the private and public sectors. But with the decrease of oil prices in the mid 1980's, interest in energy conservation programs has declined. Nevertheless, energy...

  5. Department of Energy Cyber Security Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-03-21T23:59:59.000Z

    The purpose of the Department of Energy (DOE) Cyber Security Management Program (hereafter called the Program) is to protect all DOE cyber information and information systems in order to implement the requirements of applicable laws required to maintain national security and ensure DOE business operations proceed without security events such as interruption or compromise. Cancels DOE N 205.1

  6. Performance Auditing of Energy Management Programs

    E-Print Network [OSTI]

    White, J. A.

    1988-01-01T23:59:59.000Z

    With the oil crisis of the 1970's, energy management programs became important to both the private and public sectors. But with the decrease of oil prices in the mid 1980's, interest in energy conservation programs has declined. Nevertheless, energy...

  7. CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM 1998 SITE ENVIRONMENTAL REPORT2-1

    E-Print Network [OSTI]

    , evaluates what impact, if any, current operations have on environmental media. Progress is reportedCHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM 1998 SITE ENVIRONMENTAL REPORT2-1 2 Environmental its environmental program. To further these ends, the Laboratory is developing and implementing

  8. Improving web site security with data flow management

    E-Print Network [OSTI]

    Yip, Alexander Siumann, 1979-

    2009-01-01T23:59:59.000Z

    This dissertation describes two systems, RESIN and BFLow, whose goal is to help Web developers build more secure Web sites. RESIN and BFLOW use data flow management to help reduce the security risks of using buggy or ...

  9. Site operator program final report for fiscal years 1992 through 1996

    SciTech Connect (OSTI)

    Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab.; Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Birasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

    1998-01-01T23:59:59.000Z

    The Site Operator Program was an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed at the Idaho National Engineering and Environmental Laboratory. The Program`s goals included the field evaluation of electric vehicles in real-world applications and environments; the support of electric vehicle technology advancement; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles. This report covers Program activities from 1992 to 1996. The Site Operator Program ended in September 1996, when it was superseded by the Field Operations Program. Electric vehicle testing included baseline performance testing, which was performed in conjunction with EV America. The baseline performance parameters included acceleration, braking, range, energy efficiency, and charging time. The Program collected fleet operations data on electric vehicles operated by the Program`s thirteen partners, comprising electric utilities, universities, and federal agencies. The Program`s partners had over 250 electric vehicles, from vehicle converters and original equipment manufacturers, in their operating fleets. Test results are available via the World Wide Web site at http://ev.inel.gov/sop.

  10. Demonstration Sites of Best Management Practices: A Manual for the Upper Etowah River Alliance

    E-Print Network [OSTI]

    Rosemond, Amy Daum

    Demonstration Sites of Best Management Practices: A Manual for the Upper Etowah River Alliance and the Institute of Ecology #12;UERA BMPs Demonstation Sites Manual 2 of 2 Demonstration Sites of Best Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 iii. Best Management Practices

  11. Deere & Company Energy Management Program

    E-Print Network [OSTI]

    Darby, D. F.

    1981-01-01T23:59:59.000Z

    for evaluating each unit's ene~gy savings techniques. Two more key elements merit attention. These are "energy ethic" and "feedback". The people that comprise a company can enhance a conservation program if they are convinced it is for their good as well... vital but "good business" as well. Meet Lester! One of our factories has had an an:i mated movie produced which ~eatures a polar bear: hero. He represents the central theme of an ene~gy conservation awareness program. The program con~ tinues...

  12. The ORNL Surplus Facilities Management Program Long Range Plan

    SciTech Connect (OSTI)

    Myrick, T.E.

    1984-09-01T23:59:59.000Z

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy`s (DOE) National SFMP, administered by the Richland Operations Office. This program was established to provide for the management of DOE surplus radioactively contaminated facilities from the end of their operating life until final facility disposition is completed. As part of this program, the ORNL SFMP oversees some 76 individual surplus facilities, ranging in complexity from abandoned waste storage tanks to large experimental reactors. The ORNL SFMP has prepared this Long Range Plan to outline the long-term management strategy for those facilities included in the program. The primary objective of this plan are to: (1) develop a base of information for each ORNL SFMP facility, (2) conduct preliminary decommissioning analyses to identify feasible alternatives, (3) assess the current and future risk of each facility, (4) establish a priority list for the decommissioning projects, and (5) integrate the individual project costs and schedules into an overall program schedule and cost estimate for the ORNL site. The Long Range Plan also provides an overview of the ORNL SFMP management structure, specifies the decommissioning criteria to be employed, and identifies special technical problems, research and development needs, and special facilities and equipment that may be required for decommissioning operations.

  13. Nutrient ManagementNutrient Management Program in OklahomaProgram in Oklahoma

    E-Print Network [OSTI]

    Nutrient ManagementNutrient Management Program in OklahomaProgram in Oklahoma Hailin Zhang and Dan Storm Oklahoma State University Harold Springer, ODAFF Larry Poindexter, OK NRCS #12;The Diversified OklahomaThe Diversified Oklahoma Usually acidic Usually not acidic #12;#12;Major Commodities in Oklahoma

  14. Preparing Los Alamos National Laboratory's Waste Management Program for the Future - 12175

    SciTech Connect (OSTI)

    Jones, Scotty W.; Dorries, Alison M.; Singledecker, Steven [Los Alamos National Laboratory, PO Box 1663, Los Alamos, NM 87545 (United States); Henckel, George [Los Alamos Site Office, MS-A316, Los Alamos, NM 87544 (United States)

    2012-07-01T23:59:59.000Z

    The waste management program at Los Alamos National Laboratory (LANL) is undergoing significant transition to establish a lean highly functioning waste management program that will succeed the large environmental cleanup waste management program. In the coming years, the environmental cleanup activities will be mostly completed and the effort will change to long-term stewardship. What will remain in waste management is a smaller program focused on direct off-site shipping to cost-effectively enable the enduring mission of the laboratory in support of the national nuclear weapons program and fundamental science and research. It is essential that LANL implement a highly functioning efficient waste management program in support of the core missions of the national weapons program and fundamental science and research - and LANL is well on the way to that goal. As LANL continues the transition process, the following concepts have been validated: - Business drivers including the loss of onsite disposal access and completion of major environmental cleanup activities will drive large changes in waste management strategies and program. - A well conceived organizational structure; formal management systems; a customer service attitude; and enthusiastic managers are core to a successful waste management program. - During times of organizational transition, a project management approach to managing change in a complex work place with numerous complex deliverables is successful strategy. - Early and effective engagement with waste generators, especially Project Managers, is critical to successful waste planning. - A well-trained flexible waste management work force is vital. Training plans should include continuous training as a strategy. - A shared fate approach to managing institutional waste decisions, such as the LANL Waste Management Recharge Board is effective. - An efficient WM program benefits greatly from modern technology and innovation in managing waste data and reports. - Use of six-sigma tools can help improve the quality and efficiency of waste management processes. - A fair, easy to understand, transparent, and well-overseen process for distributing the cost of waste disposal and waste program oversight is essential. (authors)

  15. Program management: The keys to a successful ERWM contract

    SciTech Connect (OSTI)

    Lenyk, R.G.; Cusack, J.G. [Foster Wheeler Environmental Corp., Oak Ridge, TN (United States)

    1995-12-31T23:59:59.000Z

    Program management for a large Environmental Restoration and Waste Management (ERWM) task order contract is both a skill and an art. Unlike project management, program management deals with global and political issues, with both client and home organizations, as well as with day-to-day operations. Program management requires up-front planning and nurturing, for no contract matures successfully by itself. This paper identifies the many opportunities presented in the planning and initial implementation of the contract. Potential traps are identified so that they can be recognized and avoided or mitigated. Teaming and subcontracting are also addressed. The authors rely on years of program management experience to explore such questions as the following: Can you have an integrated team? What needs to be done before you sign Your contract? Do you know who your client(s) is(are)? Have you incorporated the relevant, especially any new, procurement strategies? The US Department of Energy-Oak Ridge Operations (DOE-ORO) ERWM Remedial Design Contract with Foster Wheeler Environmental Corporation is used as a model for exploring these topics. This ERWM Program-which focuses on the Oak Ridge National Laboratory, the Y-12 Weapons Plant, and the K-25 Site in Oak Ridge, Tennessee; the Paducah Gaseous Diffusion Plant in Paducah, Kentucky; and the Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio-is in its fifth year with over 225 task orders. The program has been highly successful and has obtained from DOE outstanding marks for achieving quality, responsiveness, timeliness, and subcontracting goals.

  16. Oklahoma Industrial Energy Management Program

    E-Print Network [OSTI]

    Turner, W. C.; Webb, R. E.; Phillips, J. M.; Viljoen, T. A.

    1979-01-01T23:59:59.000Z

    The need for sound energy management is no longer worthy of debate. Action is necessary and much is being done by U.S. industry. Unfortunately, however, the majority of the work is being done by the few large energy intensive industries throughout...

  17. Sandia National Laboratories, California Waste Management Program annual report.

    SciTech Connect (OSTI)

    Brynildson, Mark E.

    2010-02-01T23:59:59.000Z

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  18. Sandia National Laboratories, California Hazardous Materials Management Program annual report.

    SciTech Connect (OSTI)

    Brynildson, Mark E.

    2011-02-01T23:59:59.000Z

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Hazardous Materials Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  19. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Riddle, Donna L.

    2007-05-03T23:59:59.000Z

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for implementing the QA program requirements; and Appendix C of the QA Manual provides comparison tables that identify where the requirements of other standards are addressed in the QA Manual.

  20. Urban and Industrial Sites Reinvestment Tax Credit Program (Connecticut)

    Broader source: Energy.gov [DOE]

    The Urban and Industrial Sites Reinvestment Tax Credit Program provides up to $100 million in tax credits over a ten-year period to support projects that create jobs and capital investment in under...

  1. EERE Program Management Guide - About the Program Management Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721 Federal Register / Vol. 73, No.PlantEfficiencyWebinarEnergy Program

  2. The Savannah River Site`s Groundwater Monitoring Program: First quarter 1993, Volume 1

    SciTech Connect (OSTI)

    Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1993-08-01T23:59:59.000Z

    This report summarizes the Savannah River Site (SRS) Groundwater Monitoring Program conducted by the Environmental Protection Department`s Environmental Monitoring Section (EPD/EMS) during the first quarter of 1993. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program`s activities; and serves as an official document of the analytical results.

  3. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter 1992

    SciTech Connect (OSTI)

    Not Available

    1993-05-17T23:59:59.000Z

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by the Environmental Protection Department`s Environmental Monitoring Section (EPD/EMS) during the fourth quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program`s activities; and serves as an official document of the analytical results.

  4. A study of participative management programs

    E-Print Network [OSTI]

    Harms, Robert Arthur

    1972-01-01T23:59:59.000Z

    's, several companies recognized the need for providing new techniques for 17 employee motivation and began to explore the potential value of participative management. The following are condensed. versions of the experiences of several companies...A STUDY OF PARTICIPATIVE MANAGEMENT PROGRAMS A. Thesis ROBERT ARTHUR HARMS Submitted. to the Graduate College of Texas ARcN University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE December 1972 Major Subject...

  5. FEMP (Federal Energy Management Program) Update, Spring 1989

    SciTech Connect (OSTI)

    Not Available

    1989-04-01T23:59:59.000Z

    The FEMP Update, published quarterly by the Federal Energy Management Program (FEMP), provides information that will assist federal managers in their energy management responsibilities. The Update is distributed primarily to federal facility and energy management personnel.

  6. Electric and Hybrid Vehicle Program: Site Operator Program. Quarterly progress report, April--June 1995

    SciTech Connect (OSTI)

    Kiser, D.M.; Brown, H.L.

    1995-09-01T23:59:59.000Z

    This quarterly report details activities of the Department of Energy (DOE) Site Operator Program for the months of April, May, and June 1995. The 12 program participants, their geographic locations, and the principal thrusts of their efforts are provided.

  7. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    SciTech Connect (OSTI)

    Ewy, Ann; Hays, David [U.S. Army Corps of Engineers (United States)] [U.S. Army Corps of Engineers (United States)

    2013-07-01T23:59:59.000Z

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  8. Safeguards and Security Program and Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-18T23:59:59.000Z

    The proposed revision to this Department of Energy Guide focuses on alignment of guidance for implementing key safeguard and security components to the DOE capital asset acquisition process with the revised DOE O 413.3B, Program and Project Management for Acquisition of Capital Assets, the revised DOE O 470.4B, Safeguard and Security Program, and the new series of DOE Orders replacing the DOE M 470.4 series of manuals.

  9. Determination of ecologically vital groundwaters at selected sites in the Formerly Utilized Sites Remedial Action Program

    SciTech Connect (OSTI)

    Vinikour, W.S.; Yin, S.C.L.

    1989-08-01T23:59:59.000Z

    The US Department of Energy is classifying groundwaters at sites in its Formerly Utilized Sites Remedial Action Program (FUSRAP). Of particular concern is the potential presence of groundwaters that are highly vulnerable to contamination and that are either (1) irreplaceable sources of drinking water or (2) ecologically vital. Conditions at nine FUSRAP sites were evaluated to determine if ecologically vital groundwaters are present. The sites evaluated were Wayne Interim Storage Site, Maywood Interim Storage Site, and Middlesex Sampling Plant in New Jersey; Ashland 2 Site, Seaway Industrial Park, Colonie Interim storage Site, and Niagara Falls Storage Site in New York; and the St. Louis Airport Site and Hazelwood Interim Storage Site in Missouri. The analyses indicated that groundwaters are vulnerable to contamination at all but two of the sites -- the Ashland 2 and Seaway Industrial Park sites in New York. Groundwater discharge points were identified within a 2-mile radius (i.e., the classification review area) of all of the sites. No ecologically vital groundwater areas exist in the vicinities of any of the nine FUSRAP sites evaluated. 35 refs., 17 figs.

  10. Site Management Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015ParentsMiddle|SecurityDepartmentShawn WangSioux Students KindleSite

  11. DOE Human Resources Management Division - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem NotEnergy,ARMFormsGas SeparationsRelevant toSiteCurrentAdvanced

  12. Oklahoma Industrial Energy Management Program

    E-Print Network [OSTI]

    Estes, C. B.; Turner, W. C.

    1980-01-01T23:59:59.000Z

    fact she~t was i initiated las a ! 5. Recognizes outstanding activities or contributions Consequently, the terms technology, and equipmeqt are One of the problems encountered is that ene~gy management technology is not very mature (in gen~ral). i...~ , being developed includes: i 1. A solar collector connected'to a coffee pot tio produce hot water for instant coffee. 2. A solar photovoltaic converter used to deli~er power to a child's toy. 3. Two power factor experiments designed to shoW what...

  13. Legacy Management FUSRAP Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking ofOil & Gas »of EnergyLearning &Legacy Management

  14. Legacy Management Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking ofOil & Gas »of EnergyLearning &Legacy ManagementLegacy

  15. Radiation Protection Considerations at USACE Formerly Utilized Sites Remedial Action Program (FUSRAP) Projects

    SciTech Connect (OSTI)

    Brown, S.H. [CHP, SHB INC., Centennial, Colorado (United States)

    2008-07-01T23:59:59.000Z

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was initially authorized by Congress in 1974. FUSRAP was enacted to address residual radioactive contamination associated with numerous sites across the U.S. at which radioactive material (primarily Uranium ores and related milling products) had been processed in support of the nation's nuclear weapons program dating back to the Manhattan Project and the period immediately following World War II. In October 1997, Congress transferred the management of this program from the Department of Energy to the United States Corp of Engineers. Through this program, the Corps addresses the environmental remediation of certain sites once used by DOE's predecessor agencies, the Manhattan Engineer District and the Atomic Energy Commission. The waste at FUSRAP sites consists mainly of low levels of uranium, thorium and radium, along with some mixed wastes. Upon completion of remedial activities, these sites are transferred to DOE for long-term stewardship activities. This paper presents and contrasts the radiological conditions and recent monitoring results associated with five large ongoing FUSRAP projects including Maywood, N.J.; the Linde site near Buffalo, N.Y.; Colonie in Albany N.Y. and the St Louis, Mo. airport and downtown sites. The radiological characteristics of soil and debris at each site and respective regulatory clean up criteria is presented and contrasted. Some differences are discussed in the radiological characteristics of material at some sites that result in variations in radiation protection monitoring programs. Additionally, summary data for typical personnel radiation exposure monitoring results are presented. In summary: 1. The FUSRAP projects for which data and observations are reported in this paper are considered typical of the radiological nature of FUSRAP sites in general. 2. These sites are characterized by naturally occurring uranium and thorium series radionuclides in soil and debris, at concentrations typically < E4 pCi/ gram total activity. 3. Although external exposure rates are generally low resulting in few exposures above background, occasional 'hot spots' are observed in the 1- 10 mR / hr range or higher. However personnel and general area external exposure monitoring programs consistently demonstrate very low potential for external exposure at theses sites. 4. Potential for airborne exposure is controlled by wetting and misting techniques during excavation and movement of materials. Air sampling and bioassay programs confirm low potential for airborne exposure of workers at these sites. 5. Radiation protection and health physics monitoring programs as implemented at these sites ensure that exposures to personal are maintained ALARA. (authors)

  16. New Technology Demonstration Program FEMPFederal Energy Management Program

    E-Print Network [OSTI]

    Efficiency and Renewable Energy, Federal Energy Management Program, of the U.S. Department of Energy under federal facilities, the fastest growing end-use of electric energy is found in concentrations of computing to their agency mission will present a serious challenge to meeting the aggressive new energy efficiency goals

  17. TPA Project Manager's Lists - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItemResearch >Internship Program The NIF andPoints of Contact Hanford Advisory

  18. Public participation in UMTRA Project program management

    SciTech Connect (OSTI)

    Majors, M.J.; Ulland, L.M. [Weston (Roy F.), Inc., Albuquerque, NM (United States)

    1993-12-31T23:59:59.000Z

    Innovative techniques for overcoming barriers to public participation on the US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project have led to improved communications with stakeholders at project sites and improved communications within the project. On the UMTRA Project, it`s been shown that an effective public participation program is an essential element to successful project implementation.

  19. Hanford site waste minimization and pollution prevention awareness program

    SciTech Connect (OSTI)

    Kirkendall, J.R.

    1996-09-23T23:59:59.000Z

    This plan documents the requirements of the Hanford Site Waste Minimization/Pollution Prevention (WMin/P2) Program. The plan specifies requirements for Hanford contractors to prevent pollution from entering the environment, to conserve resources and energy, and to reduce the quantity and toxicity of hazardous, radioactive, mixed, and sanitary waste generated at Hanford. The Pollution Prevention Awareness Program required by DOE 5400.1 (DOE 1988A) is included in the Hanford WMin/P2 Program.

  20. The Savannah River Site`s Groundwater Monitoring Program, third quarter 1991

    SciTech Connect (OSTI)

    Not Available

    1992-02-17T23:59:59.000Z

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  1. The Savannah River site`s groundwater monitoring program: second quarter 1997

    SciTech Connect (OSTI)

    Rogers, C.D. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1997-11-01T23:59:59.000Z

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1997, EPD/EMS conducted extensive sampling of monitoring wells. A detailed explanation of the flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1997 are included in this report.

  2. Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-15T23:59:59.000Z

    The order establishes requirements and responsibilities for the performance management program for all supervisory and non supervisory employees at grades GS 15 and below or equivalent, employees in EJ and EK pay bands IV and V in the Excepted Service, and all wage grade employees. Cancels DOE O 331.1B. Admin Chg 1, 2-16-11.

  3. Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-15T23:59:59.000Z

    The Order establishes requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees other than those who are exempt herein or by memorandum. Admin Chg 1, dated 2-16-11, cancels DOE O 331.1C.

  4. Hood Commissioning Laboratory Ventilation Management Program

    E-Print Network [OSTI]

    Pawlowski, Wojtek

    Hood Commissioning Laboratory Ventilation Management Program Form In the interest of efficiency and effective use of our limited resources, EHS will not initiate or schedule the commissioning process for any____Other (describe) Hood is:______New _______Relocated_______Reconfigured (Describe ) Requested Commissioning Date (s

  5. Management Information Systems Mexico City EMBA Program

    E-Print Network [OSTI]

    Ghosh, Joydeep

    Management Information Systems Mexico City EMBA Program Spring 2012 Professor : Professor Anitesh benefits. The true benefits of IT can be realized only when organizations exploit certain characteristics ISBN-13: 978-0123822291 Data Mining for Business Intelligence: Concepts, Techniques, and Applications

  6. HATCHERY AND GENETIC MANAGEMENT PLAN Hatchery Program

    E-Print Network [OSTI]

    HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Hatchery Program: Species or Hatchery Stock: Agency Take Thresholds for ESA-Listed 44 Upper Columbia River Steelhead Table 4. Tribal & Recreational Incidental Take Thresholds 45 for Unmarked Spring Chinook Table 5. Estimated Carrying Capacity of Natural

  7. Steam Load Reduction Guidance Emergency Management Program

    E-Print Network [OSTI]

    Pawlowski, Wojtek

    Steam Load Reduction Guidance Emergency Management Program v October 2014 Steam_Load_Reduction_Guidance_DSRDSR 1.0 PurposeandScope Utilities provides steam to the campus community for space heating, hot water in the steam distribution system or the Central Energy Plant, the preservation of building infrastructure

  8. INEEL Cultural Resource Management Program Annual Report - 2004

    SciTech Connect (OSTI)

    Clayton F. Marler

    2005-01-01T23:59:59.000Z

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The Idaho National Engineering and Environmental Laboratory Site is located in southeastern Idaho, and is home to vast numbers and a wide variety of important cultural resources representing at least 13,000-year span of human occupation in the region. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these resources with the management and ongoing operation of an active scientific laboratory, while also cleaning up the waste left by past programs and processes. The Department of Energy Idaho Operations Office has administrative responsibility for most of the Site, excluding lands and resources managed by the Naval Reactors Facility and (in 2004) Argonne National Laboratory-West. The Department of Energy is committed to a cultural resource program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative requirements. This annual report is an overview of Cultural Resource Management Program activities conducted during Fiscal Year 2004 and is intended to be both informative to external stakeholders and to serve as a planning tool for future cultural resource management work to be conducted on the Site.

  9. Laboratory Equipment Donation Program - Site Index

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn12electron 9 5 - -/e),,sand DevelopmentFrequentlySite Index

  10. Department of Energy's Tribal Program - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavid Turner David3 |AProgramLinksInsideAbout Us >

  11. Technology needs for remediation: Hanford and other DOE sites. Buried Waste Integrated Demonstration Program

    SciTech Connect (OSTI)

    Stapp, D.C.

    1993-01-01T23:59:59.000Z

    Technologies are being developed under the Buried Waste Integrated Demonstration (BWID) program to facilitate remediation of the US Department of Energy`s (DOE) buried and stored low-level radioactive, transuranic (TRU), and mixed radioactive and hazardous buried wastes. The BWID program is being coordinated by the Idaho National Engineering Laboratory (INEL) in southeastern Idaho, a DOE site that has large volumes of buried radioactive wastes. The program is currently focusing its efforts on the problems at INEL`s Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC). As specific technologies are successfully demonstrated, they will be available for transfer to applications at other DOE buried waste sites. The purpose of this study is to present buried waste technology needs that have been identified for DOE sites other than INEL.

  12. ENVIRONMENTAL STUDIES PROGRAM RENEWABLE RESOURCES & ENERGY POLICY & MANAGEMENT SPECIALIST

    E-Print Network [OSTI]

    Martin, Jeff

    ENVIRONMENTAL STUDIES PROGRAM RENEWABLE RESOURCES & ENERGY POLICY & MANAGEMENT SPECIALIST to research and teaching in areas of renewable energy, resource management and environmental policy

  13. The Department of Homeland Security Energy Management Program

    Energy Savers [EERE]

    2, 2007 4 Structure The Energy Program is managed through the Energy Management Council (EMC) Formally established by Charter signed June 11, 2004 Reports to Chief...

  14. Beryllium Program Performance Assessments - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWP TWPAlumniComplex historianBenefitsProgram Information About

  15. Beryllium Program Points of Contact - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWP TWPAlumniComplex historianBenefitsProgram Information

  16. Oak Ridge National Laboratory Radiation Control Program - Partners in Site Restoration

    SciTech Connect (OSTI)

    Jones, S. L.; Stafford, M. W.

    2002-02-26T23:59:59.000Z

    In 1998, the U.S. Department of Energy (DOE) awarded the Management and Integration (M&I) contract for all five of the Oak Ridge Operations (ORO) facilities to Bechtel Jacobs Company LLC (BJC). At Oak Ridge National Laboratory (ORNL), a world renowned national laboratory and research and development facility, the BJC mission involves executing the DOE Environmental Management (EM) program. In addition to BJC's M&I contract, UT-Battelle, LLC, a not-for-profit company, is the Management and Operating (M&O) contractor for DOE on the ORNL site. As part of ORNL's EM program, legacy inactive facilities (i.e., reactors, nuclear material research facilities, burial grounds, and underground storage tanks) are transferred to BJC and are designated as remediation, decontamination and decommissioning (D&D), or long-term surveillance and maintenance (S&M) facilities. Facilities operated by both UT-Battelle and BJC are interspersed throughout the site and are usually in close proximity. Both UT-Battelle and BJC have DOE-approved Radiation Protection Programs established in accordance with 10 CFR 835. The BJC Radiological Control (RADCON) Program adapts to the M&I framework and is comprised of a combination of subcontracted program responsibilities with BJC oversight. This paper focuses on the successes and challenges of executing the BJC RADCON Program for BJC's ORNL Project through a joint M&I contractor relationship, while maintaining a positive working relationship and partnership with UT-Battelle's Radiation Protection organization.

  17. Federal Energy Management Program Contacts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contact information is available for Federal Energy Management Program (FEMP) leadership and staff members. The program is directed by Dr. Timothy Unruh. General Information...

  18. Independent Oversight Review of the Emergency Management Program...

    Broader source: Energy.gov (indexed) [DOE]

    that ammonia is no longer stored onsite and is appropriately excluded from the hazards survey, indicating that the NETL emergency management program could be an OE base program....

  19. anger management program: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Load Management Programs CATEE Conference October, 2012 Agenda Outline I. General Demand Response Definition II. General Demand Response Program Rules III. CenterPoint...

  20. aging management programs: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Load Management Programs CATEE Conference October, 2012 Agenda Outline I. General Demand Response Definition II. General Demand Response Program Rules III. CenterPoint...

  1. EIS-0203: Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs

    Broader source: Energy.gov [DOE]

    Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs

  2. Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

    SciTech Connect (OSTI)

    Clayton, Christopher [U.S. Department of Energy Office of Legacy Management, Washington, DC; Kothari, Vijendra [U.S. Department of Energy Office of Legacy Management, Morgantown, West Virginia; Starr, Ken [U.S. Department of Energy Office of Legacy Management, Westminster, Colorado; Gillespie, Joey [S.M. Stoller Corporation, Contractor for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado; Widdop, Michael [S.M. Stoller Corporation, Contractor for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado; none,

    2012-02-26T23:59:59.000Z

    The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS&M) of remediated FUSRAP sites. DOE LTS&M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS&M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS&M.

  3. Survey Report: Improving Integration of Program Management and Systems Engineering

    E-Print Network [OSTI]

    Conforto, Edivandro

    For many years, a cultural barrier has existed between practitioners of systems engineering and of program management.  Some systems engineers and program managers have developed the mindset that their work activities ar ...

  4. RISK MANAGEMENT FRAMEWORK: HELPING ORGANIZATIONS IMPLEMENT EFFECTIVE INFORMATION SECURITY PROGRAMS

    E-Print Network [OSTI]

    RISK MANAGEMENT FRAMEWORK: HELPING ORGANIZATIONS IMPLEMENT EFFECTIVE INFORMATION SECURITY PROGRAMS Shirley Radack, Editor Computer Security Division Information Technology Laboratory National Institute component of every organization's information security program. An effective risk management process enables

  5. asthma management program: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management Programs Texas A&M University - TxSpace Summary: With the oil crisis of the 1970's, energy management programs became important to both the private and public sectors....

  6. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1991-09-01T23:59:59.000Z

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  7. Description of the Formerly Utilized Sites Remedial Action Program

    SciTech Connect (OSTI)

    Not Available

    1980-09-01T23:59:59.000Z

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

  8. EL Program: Smart Grid Program Manager: David Wollman, Smart Grid and Cyber-Physical Systems

    E-Print Network [OSTI]

    EL Program: Smart Grid Program Manager: David Wollman, Smart Grid and Cyber-Physical Systems Program Office, Associate Program Manager: Dean Prochaska, Smart Grid and Cyber- Physical Systems Program [updated August 23, 2013] Summary: This program develops and demonstrates smart grid measurement science

  9. Environmental Management System 2 2005 Site environmental report2-

    E-Print Network [OSTI]

    Environmental Management System 2 2005 Site environmental report2- One of Brookhaven National Laboratory's highest priorities is ensuring that its environmental performance measures up to its world of DOE, takes environmental stewardship very seriously. As part of BSA's commitment to environmentally

  10. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1990

    SciTech Connect (OSTI)

    Not Available

    1991-06-18T23:59:59.000Z

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the fourth quarter of 1990. It includes the analytical data, field data, well activity data, and other documentation for this program, provides a record of the program`s activities and rationale, and serves as an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of analytical and other data, maintenance of the databases containing groundwater monitoring data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  11. Federal Energy Management Program Procedure for Notifying Congress...

    Broader source: Energy.gov (indexed) [DOE]

    Document displays the Federal Energy Management Program's Procedure for notifying Congress prior to awarding energy savings performance contracts (ESPCs) espccongressionalnotific...

  12. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26T23:59:59.000Z

    The manual establishes program planning and management requirements for the Department’s Safeguards and Security (S&S) Program. Change 2 is a revision to Section M of both the Manual and the CRD to realign the process for establishing deviations from DOE directives containing safeguards and security requirements to reflect established Departmental policy as set forth in DOE O 251.1C. Original publication, 8-26-05; Chg 1, 3-7-06. Canceled by DOE O 470.4B

  13. Nevada Test Site Radiation Protection Program - Revision 1

    SciTech Connect (OSTI)

    Radiological Control Managers' Council

    2008-06-01T23:59:59.000Z

    Title 10 Code of Federal Regulations (CFR) Part 835, 'Occupational Radiation Protection,' establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada Test Site (NTS), related (on-site or off-site) U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) operations, and environmental restoration off-site projects. This NTS RPP promulgates the radiation protection standards, limits, and program requirements for occupational exposure to ionizing radiation resulting from NNSA/NSO activities at the NTS and other operational areas as stated in 10 CFR 835.1(a). NNSA/NSO activities (including design, construction, operation, and decommissioning) within the scope of this RPP may result in occupational exposures to radiation or radioactive material. Therefore, a system of control is implemented through specific references to the site-specific NV/YMP RCM. This system of control is intended to ensure that the following criteria are met: (1) occupational exposures are maintained as low as reasonably achievable (ALARA), (2) DOE's limiting values are not exceeded, (3) employees are aware of and are prepared to cope with emergency conditions, and (4) employees are not inadvertently exposed to radiation or radioactive material.

  14. External Authorities and Peers Laboratory Ventilation Management Program

    E-Print Network [OSTI]

    Pawlowski, Wojtek

    External Authorities and Peers Laboratory Ventilation Management Program Guidance Document External Authorities and Peers This group encompasses external groups who do not manage laboratory ventilation systems to laboratory ventilation management. Roles Responsibilities Tracking Indicator Laboratory science peers

  15. Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-15T23:59:59.000Z

    To establish requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees at grades GS-15 and below or equivalent, employees in EJ and EK pay bands IV and V in the Excepted Service, and all wage grade employees. Admin Chg 1, dated 2-16-11. Admin Chg 2, dated 2-26-2013, cancels DOE O 331.1C Admin Chg 1. Canceled by DOE O 331.1C Chg 3.

  16. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21T23:59:59.000Z

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  17. Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-15T23:59:59.000Z

    To establish requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees at grades GS-15 and below or equivalent, employees in EJ and EK pay bands IV and V in the Excepted Service, and all wage grade employees. Admin Chg 1, dated 2-16-11. Admin Chg 2, dated 2-26-2013. Admin Chg 3, dated 11-13-14 cancels Admin Chg 2.

  18. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21T23:59:59.000Z

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Cancels DOE O 433.1A. Admin Chg 1, dated 3-12-2013, cancels DOE O 433.1B.

  19. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13T23:59:59.000Z

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  20. Federal Energy Management Program Report Template

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport in RepresentativeDepartmentEnergyEnergy Management Program

  1. 1998 Environmental Management Science Program Annual Report

    SciTech Connect (OSTI)

    None

    1999-03-01T23:59:59.000Z

    The Environmental Management Science Program (EMSP) is a collaborative partnership between the DOE Office of Environmental Management (EM), Office of Science (DOE-SC), and the Idaho Operations Office (DOE-ID) to sponsor basic environmental and waste management related research. Results are expected to lead to reduction of the costs, schedule, and risks associated with cleaning up the nation's nuclear complex. The EMSP research portfolio addresses the most challenging technical problems of the EM program related to high level waste, spent nuclear fuel, mixed waste, nuclear materials, remedial action, decontamination and decommissioning, and health, ecology, or risk. The EMSP was established in response to a mandate from Congress in the fiscal year 1996 Energy and Water Development Appropriations Act. Congress directed the Department to ''provide sufficient attention and resources to longer-term basic science research which needs to be done to ultimately reduce cleanup costs, develop a program that takes advantage of laboratory and university expertise, and seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective''. This mandate followed similar recommendations from the Galvin Commission to the Secretary of Energy Advisory Board. The EMSP also responds to needs identified by National Academy of Sciences experts, regulators, citizen advisory groups, and other stakeholders.

  2. Groundwater protection management program plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect (OSTI)

    Not Available

    1992-06-01T23:59:59.000Z

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

  3. Development, Review, and Publication of the Hanford Site Solid Waste Program Environmental Impact Statement

    SciTech Connect (OSTI)

    Gajewski, Stephen W.; Johnson, Wayne L.; Payson, David R.; Rhoads, Kathleen; Sanders, George H.

    2004-02-01T23:59:59.000Z

    The Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (HSW EIS) provides environmental and technical information concerning U.S. Department of Energy (DOE) proposed waste management practices at the Hanford Site. The HSW EIS covers four primary aspects of waste management at Hanford – waste treatment, storage, transportation, and disposal. It also addresses four kinds of solid radioactive waste – low-level waste (LLW), mixed (radioactive and chemically hazardous) low-level waste (MLLW), transuranic (TRU) waste (including mixed TRUW), and immobilized low-activity waste (ILAW) from treatment of Hanford’s tanks waste. The HSW EIS is intended to help DOE determine what specific Hanford Site facilities will continue to be used, will be modified, or need to be constructed to treat, store, and dispose of these wastes.

  4. Hanford Site Tank Waste Remediation System. Waste management 1993 symposium papers and viewgraphs

    SciTech Connect (OSTI)

    Not Available

    1993-05-01T23:59:59.000Z

    The US Department of Energy`s (DOE) Hanford Site in southeastern Washington State has the most diverse and largest amount of highly radioactive waste of any site in the US. High-level radioactive waste has been stored in large underground tanks since 1944. A Tank Waste Remediation System Program has been established within the DOE to safely manage and immobilize these wastes in anticipation of permanent disposal in a geologic repository. The Hanford Site Tank Waste Remediation System Waste Management 1993 Symposium Papers and Viewgraphs covered the following topics: Hanford Site Tank Waste Remediation System Overview; Tank Waste Retrieval Issues and Options for their Resolution; Tank Waste Pretreatment - Issues, Alternatives and Strategies for Resolution; Low-Level Waste Disposal - Grout Issue and Alternative Waste Form Technology; A Strategy for Resolving High-Priority Hanford Site Radioactive Waste Storage Tank Safety Issues; Tank Waste Chemistry - A New Understanding of Waste Aging; Recent Results from Characterization of Ferrocyanide Wastes at the Hanford Site; Resolving the Safety Issue for Radioactive Waste Tanks with High Organic Content; Technology to Support Hanford Site Tank Waste Remediation System Objectives.

  5. The Savannah River Site`s Groundwater Monitoring Program: Third quarter 1992

    SciTech Connect (OSTI)

    Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1993-02-04T23:59:59.000Z

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1992, EPD/EMS conducted extensive sampling of monitoring wells. Table 1 lists those well series with constituents in the groundwater above Flag 2 during third quarter 1992, organized by location. Results from all laboratory analyses are used to generate this table. Specific conductance and pH data from the field also are included in this table.

  6. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    SciTech Connect (OSTI)

    Not Available

    1993-03-01T23:59:59.000Z

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

  7. Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2007-09-01T23:59:59.000Z

    The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure cover has been placed on unit U-3ax/bl (Corrective Action Unit 110) at the Area 3 RWMS. Monolayer-evapotranspirative closure cover designs for the U-3ah/at and U-3bh units are provided in this plan. The current-design closure cover thickness is 3 meters (10 feet). The final design cover will have an optimized cover thickness, which is expected to be less than 3 m (10 ft). Although waste operations at the Area 3 RWMS have ceased at the end of June 2006, disposal capacity is available for future disposals at the U-3ah/at and U-3bh units. The Area 3 RWMS is expected to start closure activities in fiscal year 2025, which include the development of final performance assessment and composite analysis documents, closure plan, closure cover design for construction, cover construction, and initiation of the post-closure care and monitoring activities. Current monitoring at the Area 3 RWMS includes monitoring the cover of the closed mixed waste unit U-3ax/bl as required by the Nevada Department of Environmental Protection, and others required under federal regulations and DOE orders. Monitoring data, collected via sensors and analysis of samples, are needed to evaluate radiation doses to the general public, for performance assessment maintenance, to demonstrate regulatory compliance, and to evaluate the actual performance of the RWMSs. Monitoring provides data to ensure the integrity and performance of waste disposal units. The monitoring program is designed to forewarn management and regulators of any failure and need for mitigating actions. The plan describes the program for monitoring direct radiation, air, vadose zone, biota, groundwater, meteorology, and subsidence. The requirements of post-closure cover maintenance and monitoring will be determined in the final closure plan.

  8. Nevada National Security Site Groundwater Program Prepares for Peer Review

    Broader source: Energy.gov [DOE]

    LAS VEGAS – The historic underground test area known as Yucca Flat is the focus of an upcoming independent peer review. In preparation, groundwater specialists working for the Nevada National Security Site (NNSS) groundwater program have scheduled a week-long dry run in February.

  9. Nevada National Security Site Groundwater Program Welcomes Peer Review Team

    Broader source: Energy.gov [DOE]

    Recently, an independent peer review team was invited to assess the groundwater characterization program at the Nevada National Security Site (NNSS). This nationally recognized group of experts, from various external organizations, will examine the computer modeling approach developed to better understand how historic underground nuclear testing in Yucca Flat affected the groundwater.

  10. The Savannah River Site's Groundwater Monitoring Program, third quarter 1991

    SciTech Connect (OSTI)

    Not Available

    1992-02-17T23:59:59.000Z

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  11. Financial services FY 1995 site support program plan WBS 6.10.4

    SciTech Connect (OSTI)

    Vodney, E.P.

    1994-09-01T23:59:59.000Z

    This is the signed Financial Service fiscal year 1995 Site Support Program Plan, Work Breakdown Structure 6.10.4, for the Hanford site. This plan is intended to enable the contractor to accomplish the following: ensure financial integrity in all Westinghouse Hanford Company (WHC) operation while supporting the programmatic activities of WHC, the US Department of Energy, Richland Operations Office, and other Hanford contractors; provide efficient and effective financial services, and value added audits and review that enable management to enhance future operational results.

  12. Brownfield landfill remediation under the Illinois EPA site remediation program

    SciTech Connect (OSTI)

    Beck, J.; Bruce, B.; Miller, J.; Wey, T.

    1999-07-01T23:59:59.000Z

    Brownfield type landfill remediation was completed at the Ft. Sheridan Historic Landmark District, a former Army Base Realignment and Closure Facility, in conjunction with the future development of 551 historic and new homes at this site. The project was completed during 1998 under the Illinois Environmental Protection Agency (Illinois EPA) Site Remediation Program. This paper highlights the Illinois EPA's Site Remediation Program and the remediation of Landfills 3 and 4 at Fort Sheridan. The project involved removal of about 200,000 cubic yards of landfill waste, comprised of industrial and domestic refuse and demolition debris, and post-removal confirmation sampling of soils, sediment, surface water, and groundwater. The sample results were compared to the Illinois Risk-Based Cleanup levels for residential scenarios. The goal of the removal project was to obtain a No Further Remediation letter from the Illinois EPA to allow residential development of the landfill areas.

  13. The Swedish Program has Entered the Site Selection Phase

    SciTech Connect (OSTI)

    Nygards, P.; Hedman, T.; Eng, T.; Olsson, O.

    2003-02-25T23:59:59.000Z

    Facilities for intermediate storage of spent fuel and HLW and for final disposal of ILW and LLW together with a system for sea transportation have been in operation in Sweden for more then 15 years. To complete the ''back end system'' the remaining parts are to build facilities for encapsulation and final storage of spent fuel and HLW. The Swedish reference method for final disposal of spent fuel, KBS-3, is to encapsulate the fuel elements in copper canisters and dispose them in a deep geological repository. The Swedish program up to 2001 was focused on the establishment of general acceptance of the reference method for final storage and SKB's selection of candidate sites for a deep geological repository. In the end of year 2000 SKB presented a report as a base for a Government decision about the siting process. This report gave the background for the selection of three candidate sites. It also presented the program for geological surveys of the candidate sites as well as the background for the choice of the method for final disposal of spent nuclear fuel and HLW. In the end of 2001 the Swedish government endorsed the plan for the site selection phase and stated that the KBS-3 design of the repository shall be used as the planning base for the work. Permissions were also granted for the fieldwork from the municipalities of Forsmark and Oskarshamn where the candidate sites are located. Site investigations on these two sites started during 2002. The technical development and demonstration of the KBS 3-method is ongoing at the Dspv Hard Rock Laboratory and the Canister Laboratory. The goal for the coming five years period is to select the site for the repository and apply for licenses to construct and operate the facilities for encapsulation and final storage of spent fuel. The encapsulation plant and the repository are planned to be in operation around year 2015.

  14. QUALITY ASSURANCE PROGRAM 1997 BNL Site Environmental Report 10 -1

    E-Print Network [OSTI]

    at the Laboratory, and provides professional assistance and guidance to the De- partments and Divisions. The ES&HS, and guidance procedures for the Divisions and Departments based on DOE Order 5700.6C. The ES&HS Division has adopted or adapted these program elements into the ES&HS Division Management System Manual (BNL, 1994

  15. V-146: HP Service Manager Bugs Permit Cross-Site Scripting and...

    Broader source: Energy.gov (indexed) [DOE]

    Cross-Site Scripting and Information Disclosure Attacks PLATFORM: Service Manager v9.31 Web Tier ABSTRACT: Two vulnerabilities were reported in HP Service Manager REFERENCE LINKS:...

  16. NNSA Announces Kevin W. Smith as Los Alamos Site Office Manager...

    National Nuclear Security Administration (NNSA)

    Kevin W. Smith as Los Alamos Site Office Manager | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

  17. DOE Site Facility Management Contracts Internet Posting | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsNovember 13, 2014ContributingDOE Contract DOEEnergy Site Facility Management

  18. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2008-09-01T23:59:59.000Z

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

  19. UMTRA (Uranium Mill Tailings Remedial Action) Project site management manual

    SciTech Connect (OSTI)

    Not Available

    1990-10-01T23:59:59.000Z

    The purpose of this manual is to summarize the organizational interfaces and the technical approach used to manage the planning, design development, National Environmental Policy Act (NEPA) compliance, engineering, and remedial action required to stabilize and control the designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites. This manual describes the Project's objective, participants' roles and responsibilities, technical approach for accomplishing the objective, and planning and managerial controls to be used in performing the site work. The narrative follows the flow of activities depicted in Figure 1.1, which provides the typical sequence of key Project activities. A list of acronyms used is presented at the end of the manual. The comparable manual for UMTRA Project vicinity properties is the Vicinity Properties Management and Implementation Manual'' (VPMIM) (UMTRA-DOE/AL-050601). Together, the two manuals cover the remedial action activities associated with UMTRA Project sites. The UMTRA Project's objective is to stabilize and control the uranium mill tailings, vicinity property materials, and other residual radioactive materials at the designated sites (Figure 1.2) in a safe and environmentally sound manner in order to minimize radiation health hazards to the public. 26 figs., 6 tabs.

  20. California Coastal Management Program | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainableCSL Gas Recovery Biomass16 2013Management Program Jump to:

  1. PPPO Program Management | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122Commercial602 1,39732onMakeEducation ProgramsTour TrackerDepartmentManagement PPPO

  2. Federal Energy Management Program: BLCC5 Registration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport in RepresentativeDepartmentEnergyEnergy Management ProgramFederal

  3. Development and Implementation of a Program Management Maturity Model

    SciTech Connect (OSTI)

    Hartwig, Laura; Smith, Matt

    2008-12-15T23:59:59.000Z

    In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

  4. INL Site FY 2010 Executable Plan for Energy and Transportation Fuels Management with the FY 2009 Annual Report

    SciTech Connect (OSTI)

    Ernest L. Fossum

    2009-12-01T23:59:59.000Z

    It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

  5. Nuclear Waste Management Program summary document, FY 1981

    SciTech Connect (OSTI)

    Meyers, Sheldon

    1980-03-01T23:59:59.000Z

    The Nuclear Waste Management Program Summary Document outlines the operational and research and development (R and D) activities of the Office of Nuclear Waste Management (NEW) under the Assistant Secretary for Nuclear Energy, US Department of Energy (DOE). This document focuses on the current and planned activities in waste management for FY 1981. This Program Summary Document (PSD) was prepared in order to explain the Federal nuclear waste management and spent fuel storage programs to Congress and its committees and to interested members of the public, the private sector, and the research community. The national energy policy as it applies to waste management and spent fuel storage is presented first. The program strategy, structure, budget, management approach, and public participation programs are then identified. The next section describes program activities and outlines their status. Finally, the applicability of departmental policies to NEW programs is summarized, including field and regional activities, commercialization plans, and environmental and socioeconomic implications of waste management activities, and international programs. This Nuclear Waste Management Program Summary Document is meant to serve as a guide to the progress of R and D and other energy technology programs in radioactive waste management. The R and D objective is to provide the Nation with acceptable solutions to short- and long-term management problems for all forms of radioactive waste and spent fuel.

  6. UNIVERSITY OF MANITOBA Procedures: ASBESTOS MANAGEMENT PROGRAM PROCEDURE

    E-Print Network [OSTI]

    Major, Arkady

    UNIVERSITY OF MANITOBA PROCEDURE Procedures: ASBESTOS MANAGEMENT PROGRAM PROCEDURE Parent Policy relevant to management and control of asbestos-containing building materials known to be present throughout be made on a regular and required basis, in consultation with the Asbestos Management Program Committee

  7. St. Louis Airport Site. Annual site environmental report, calendar year 1985. Formerly Utilized Sites Remedial Action Program (FUSRAP). Revision 1

    SciTech Connect (OSTI)

    Not Available

    1986-09-01T23:59:59.000Z

    During 1985, the environmental monitoring program was continued at the St. Louis Airport Site (SLAPS) in St. Louis County, Missouri. The ditches north and south of the site have been designated for cleanup as part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). The monitoring program at the SLAPS measures radon gas concentrations in air; external gamma radiation dose rates; and uranium, thorium, and radium concentrations in surface water, groundwater, and sediment. Potential radiation doses to the public are also calculated. Because the site is not controlled or regulated by the DOE, the DOE Derived Concentration Guides (DCGs) are not applicable to SLAPS, but are included only as a basis for comparison. The DOE DCGs and the DOE radiation protection standard have been revised. (Appendix B). During 1985, annual average radon levels in air at the SLAPS were below the DCG for uncontrolled areas. External gamma monitoring in 1985 showed measured annual gamma dose rates ranging from 3 to 2087 mrem/y, with the highest value occurring in an area known to be contaminated. The calculated maximum dose at the site boundary, assuming limited occupancy, would be 6 mrem/y. Average annual concentrations of /sup 230/Th, /sup 226/Ra, and total uranium in surface waters remained below the DOE DCG. The on-site groundwater measurements showed that average annual concentrations of /sup 230/Th, /sup 226/Ra and total uranium were within the DOE DCGs. Although there are no DCGs for sediments, all concentrations of total uraniu, /sup 230/Th, and /sup 226/Ra were below the FUSRAP Guidelines.

  8. Hydrologic resources management program, FY 1998 progress report

    SciTech Connect (OSTI)

    Benedict, F.C.; Criss, R.E.; Davisson, M.L.; Eaton, G.F.; Hudson, G.B.; Kenneally, J.M.; Rose, T.P.; Smith, D.

    1999-07-26T23:59:59.000Z

    This report presents the results from FY 1998 technical studies conducted by Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area (UGTA) project. The HRMP is sponsored by Defense Programs (DP) of the U.S. Department of Energy, Nevada Operations Office (DOE/NV), and supports DP operations at the Nevada Test Site (NTS) through studies of radiochemistry and resource management related to the defense programs mission. Other participating organizations include the Los Alamos National Laboratory (LANL), the United States Geological Survey (USGS), the Desert Research Institute (DRI) of the University of Nevada, the United States Environmental Protection Agency (EPA), and Bechtel-Nevada (BN). The UGTA project is an Environmental Management (EM) activity of DOE/NV that supports a Federal Facilities Agreement and Consent Order between the Department of Energy, the Department of Defense, and the State of Nevada. UGTA's primary function is to address the legacy release of hazardous constituents at the Nevada Test Site, the Tonopah Test Range, and off-Nevada Test Site underground nuclear testing areas. Participating contractors include LLNL (Earth and Environmental Sciences Directorate, Analytical and Nuclear Chemistry Division), LANL, DRI, USGS, BN, HSI-GeoTrans, and IT Corporation. The FY 1998 HRMP and UGTA annual progress report follows the organization and contents of our FY 1997 report (Smith et al., 1998), and includes our results from CY 1997-1998 technical studies of radionuclide migration and isotope hydrology at the Nevada Test Site. During FY 1998, LLNL continued its efforts under the HRMP to pursue a technical agenda relevant to the science-based stockpile stewardship program at DOE/NV. Support to UGTA in FY 1998 included efforts to quantitatively define the radionuclide source term residual from underground nuclear weapons testing and the derivative solution, or hydrologic source term, from radionuclides dissolved in or transported by groundwater. The hydrologic source term is a component of a predicted dose assessment for the five principal NTS testing areas.

  9. The Savannah River Site`s Groundwater Monitoring Program 1993 well installation, abandonment, and maintenance report

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    This report is a summary of the well and environmental soil boring information compiled for the groundwater monitoring program of the Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) at the Savannah River Site (SRS) during 1993. It includes discussions of environmental soil borings, surveying, well construction, abandonments, maintenance, and stabilization. EPD/EMS is responsible for monitoring constituents in the groundwater at approximately 135 waste sites in 16 areas at SRS. The majority of this monitoring is required by US Department of Energy (DOE) orders and by federal and state regulations administered by the US Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells; environmental soil borings; development of sampling and analytical schedules; collection and analyses of groundwater samples; review of analytical and other data; maintenance of the databases containing groundwater monitoring data; quality assurance (QA) evaluations of laboratory performance; and reports of results to waste site facility custodians and to the Environmental Protection Section (EPS) of EPD. EPD/EMS is responsible for monitoring the wells but is not responsible for the facilities that are monitored. It is the responsibility of the custodian of each waste site to ensure that EPD/EMS is informed of sampling requirements and special requests for the sampling schedule, to assist in reviewing the data, and to make any decisions regarding groundwater monitoring at the waste site.

  10. Characterization ReportOperational Closure Covers for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    SciTech Connect (OSTI)

    Bechtel Nevada Geotechnical Sciences

    2005-06-01T23:59:59.000Z

    Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS) for the U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The Area 3 RWMS is located in south-central Yucca Flat and the Area 5 RWMS is located about 15 miles south, in north-central Frenchman Flat. Though located in two separate topographically closed basins, they are similar in climate and hydrogeologic setting. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste, while the Area 3 RWMS uses subsidence craters formed from underground testing of nuclear weapons for the disposal of packaged and unpackaged bulk waste. Over the next several decades, most waste disposal units at both the Area 3 and Area 5 RWMSs are anticipated to be closed. Closure of the Area 3 and Area 5 RWMSs will proceed through three phases: operational closure, final closure, and institutional control. Many waste disposal units at the Area 5RWMS are operationally closed and final closure has been placed on one unit at the Area 3 RWMS (U-3ax/bl). Because of the similarities between the two sites (e.g., type of wastes, environmental factors, operational closure cover designs, etc.), many characterization studies and data collected at the Area 3 RWMS are relevant and applicable to the Area 5 RWMS. For this reason, data and closure strategies from the Area 3 RWMS are referred to as applicable. This document is an interim Characterization Report – Operational Closure Covers, for the Area 5 RWMS. The report briefly describes the Area 5 RWMS and the physical environment where it is located, identifies the regulatory requirements, reviews the approach and schedule for closing, summarizes the monitoring programs, summarizes characterization studies and results, and then presents conclusions and recommendations.

  11. Inspection of Environment, Safety, and Health and Emergency Management at the Nevada Test Site- Summary Report, October 2002

    Broader source: Energy.gov [DOE]

    The Secretary of Energy’s Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the National Nuclear Security Administration (NNSA) Nevada Test Site (NTS) in September and October

  12. Framework for managing wastes from oil and gas exploration and production (E&P) sites.

    SciTech Connect (OSTI)

    Veil, J. A.; Puder, M. G.; Environmental Science Division

    2007-09-15T23:59:59.000Z

    Oil and gas companies operate in many countries around the world. Their exploration and production (E&P) operations generate many kinds of waste that must be carefully and appropriately managed. Some of these wastes are inherently part of the E&P process; examples are drilling wastes and produced water. Other wastes are generic industrial wastes that are not unique to E&P activities, such as painting wastes and scrap metal. Still other wastes are associated with the presence of workers at the site; these include trash, food waste, and laundry wash water. In some host countries, mature environmental regulatory programs are in place that provide for various waste management options on the basis of the characteristics of the wastes and the environmental settings of the sites. In other countries, the waste management requirements and authorized options are stringent, even though the infrastructure to meet the requirements may not be available yet. In some cases, regulations and/or waste management infrastructure do not exist at all. Companies operating in these countries can be confronted with limited and expensive waste management options.

  13. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program

    SciTech Connect (OSTI)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01T23:59:59.000Z

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  14. Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report, January--March 1996

    SciTech Connect (OSTI)

    Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles City Dept. of Water and Power, CA (United States)] [and others

    1996-08-01T23:59:59.000Z

    Goals of the site operator program include field evaluation of electric vehicles (EVs) in real-world applications and environments, advancement of electric vehicle technologies, development of infrastructure elements necessary to support significant EV use, and increasing the awareness and acceptance of EVs by the public. The site operator program currently consists of 11 participants under contract and two other organizations with data-sharing agreements with the program. The participants (electric utilities, academic institutions, Federal agencies) are geographically dispersed within US and their vehicles see a broad spectrum of service conditions. Current EV inventories of the site operators exceeds 250 vehicles. Several national organizations have joined DOE to further the introduction and awareness of EVs, including: (1) EVAmerica (a utility program) and DOE conduct performance and evaluation tests to support market development for EVs; (2) DOE, DOT, the Electric Transportation Coalition, and the Electric Vehicle Association of the Americas are conducting a series of workshops to encourage urban groups in Clean Cities (a DOE program) to initiate the policies and infrastructure development necessary to support large-scale demonstrations, and ultimately the mass market use, of EVs. Current focus of the program is collection and dissemination of EV operations and performance data to aid in the evaluation of real- world EV use. This report contains several sections with vehicle evaluation as a focus: EV testing results, energy economics of EVs, and site operators activities.

  15. E-FUSRAP: AUTOMATING THE CASE FILE FOR THE FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM

    SciTech Connect (OSTI)

    Mackenzie, D.; Marshall, K.

    2003-02-27T23:59:59.000Z

    The Department of Energy's (DOE) Office of Site Closure, EM-30, houses the document library pertaining to sites that are related to the Formerly Utilized Sites Remedial Action Program (FUSRAP) and regularly addresses ongoing information demands, primarily from Freedom of Information Act (FOIA) requests, interested members of the public, the DOE, and other Federal Agencies. To address these demands more efficiently, DOE has begun to implement a new multi-phase, information management process known as e-FUSRAP. The first phase of e-FUSRAP, the development of the Considered Sites Database, summarizes and allows public access to complex information on over 600 sites considered as candidates for FUSRAP. The second phase of e-FUSRAP, the development of the Document Indexing Database, will create an internal index of more than 10,000 documents in the FUSRAP library's case file, allowing more effective management and retrieval of case file documents. Together, the phases of e-FUSRAP will allow EM-30 to become an innovative leader in enhancing public information sources.

  16. Nuclear Safety Basis Program Review Overview and Management Oversight...

    Broader source: Energy.gov (indexed) [DOE]

    This SRP, Nuclear Safety Basis Program Review, consists of five volumes. It provides information to help strengthen the technical rigor of line management oversight and federal...

  17. Ocean Energy Technology Overview: Federal Energy Management Program (FEMP)

    SciTech Connect (OSTI)

    Not Available

    2009-07-01T23:59:59.000Z

    Introduction to and overview of ocean renewable energy resources and technologies prepared for the U.S. Department of Energy Federal Energy management Program.

  18. IT Capital Planning Corporate Management Improvement Program (CMIP)

    Broader source: Energy.gov [DOE]

    The Corporate Management Improvement Program (CMIP) was initiated by the Department in recognition of the fact that corporate legacy systems that support administrative functions were nearing the...

  19. Federal Energy Management Program Procedure for Notifying Congress...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Energy Management Program's Procedure for Notifying Congress Prior to Award of Energy Savings Performance Contracts (ESPCs) Although the Energy Independence and Security...

  20. Instrumentation Technical Program Management Team: FY-1987 annual report

    SciTech Connect (OSTI)

    Hanson, M.L.; Englert, G.L.; Grametbauer, G.L.

    1988-04-14T23:59:59.000Z

    This report contains evaluations of process, environmental, health, and safety instrumentation of gaseous diffusion plants. The study was conducted by the instrumentation technical program management team. (LSP)

  1. Anaheim Public Utilities- Small Business Energy Management Assistance Program

    Broader source: Energy.gov [DOE]

    The Small Business Energy Management System Program provides participating customers with free electrical energy use evaluations, retrofit funding, and installation assistance. Anaheim Public...

  2. Federal Energy Management Program eTraining Core Courses

    Broader source: Energy.gov [DOE]

    Video summarizes the Federal Energy Management Program's (FEMP) eTraining courses available anytime online on the Whole Building Design Guide website.

  3. Federal Energy Management Program Training Offers IACET Continuing Education Units

    Broader source: Energy.gov [DOE]

    Video explains how the Federal Energy Management Program offers International Association for Continuing Education and Training (IACET) continuing education units for eTraining core courses.

  4. CRAD, Emergency Management Program - February 13, 2014 (HSS CRAD...

    Broader source: Energy.gov (indexed) [DOE]

    and methodologies required by DOE 151.1C, including the implementation of Fukushima lessons learned for DOE emergency management programs described in OE-1. CRAD,...

  5. Save Energy Now Assessment Helps Expand Energy Management Program...

    Broader source: Energy.gov (indexed) [DOE]

    identify significant energy savings opportunities in their Dalton, Georgia, plant's steam system. Save Energy Now Assessment Helps Expand Energy Management Program at Shaw...

  6. ageing management programs: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ...4 4. Physical Exam Requirements Rosen, Jay 13 Demand Response: Load Management Programs Texas A&M University - TxSpace Summary:...

  7. EM's Development Program for New Managers/Supervisors

    Broader source: Energy.gov [DOE]

    This development program provides new managers and supervisors with 80 hours of developmental activities during the first two years they are in a leadership position. The program meets OPM, DOE and...

  8. Independent Oversight Inspection, Hanford Site- September 2006

    Broader source: Energy.gov [DOE]

    Inspection of Environment, Safety, and Health and Emergency Management Programs at the Hanford Site Waste Stabilization and Disposition Project

  9. DOE-ORP Contract Management Plans - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management Fermi SitePARTOffice ofHale Plan24,7, 2012 Bill Taylor,ORP

  10. Employee Motivation in Energy Management Programs

    E-Print Network [OSTI]

    Hogeland, A. W.

    1982-01-01T23:59:59.000Z

    Effective management of energy requires the same degree of manager/employee motivation as other management responsibilities. Basically the same factors cause managers and employees to be motivated and effective. In this discussion, we will review...

  11. Recommendations for improvements to program and project management

    SciTech Connect (OSTI)

    Not Available

    1994-01-01T23:59:59.000Z

    Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

  12. Greenhouse Gas Management Program Overview (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-11-01T23:59:59.000Z

    Program fact sheet highlighting federal requirements for GHG emissions management, FEMP services to help agencies reduce emissions, and additional resources. The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) assists Federal agencies with managing their greenhouse gas (GHG) emissions. GHG management entails measuring emissions and understanding their sources, setting a goal for reducing emissions, developing a plan to meet this goal, and implementing the plan to achieve reductions in emissions. FEMP provides the following services to help Federal agencies meet the requirements of inventorying and reducing their GHG emissions: (1) FEMP offers one-on-one technical assistance to help agencies understand and implement the Federal Greenhouse Gas Accounting and Reporting Guidance and fulfill their inventory reporting requirements. (2) FEMP provides training, tools, and resources on FedCenter to help agencies complete their annual inventories. (3) FEMP serves a leadership role in the interagency Federal Working Group on Greenhouse Gas Accounting and Reporting that develops recommendations to the Council on Environmental Quality (CEQ) for the Federal Greenhouse Gas Accounting and Reporting Guidance. (4) As the focus continues to shift from measuring emissions (completing inventories) to mitigating emissions (achieving reductions), FEMP is developing a strategic planning framework and resources for agencies to prioritize among a variety of options for mitigating their GHG emissions, so that they achieve their reduction goals in the most cost-effective manner. These resources will help agencies analyze their high-quality inventories to make strategic decisions about where to use limited resources to have the greatest impact on reducing emissions. Greenhouse gases trap heat in the lower atmosphere, warming the earth's surface temperature in a natural process known as the 'greenhouse effect.' GHGs include carbon dioxide (CO{sub 2}), methane (CH{sub 4}), nitrous oxide (N{sub 2}O), perfluorocarbons (PFCs), hydrofluorocarbons (HFCs), and sulfur hexafluoride (SF{sub 6}). Human activities have caused a rapid increase in GHG concentrations. This rising level contributes to global climate change, which contributes to environmental and public health problems.

  13. Fire Protection Program fiscal year 1996, site support program plan Hanford Fire Department. Revision 2

    SciTech Connect (OSTI)

    Good, D.E.

    1995-09-01T23:59:59.000Z

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under a mutual aid agreement and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System). The fire department also provides site fire marshal overview authority, fire system testing and maintenance, self-contained breathing apparatus maintenance, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This report gives a program overview, technical program baselines, and cost and schedule baseline.

  14. Y-12 Site environmental protection program implementation plan (EPPIP)

    SciTech Connect (OSTI)

    NONE

    1996-11-01T23:59:59.000Z

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  15. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    SciTech Connect (OSTI)

    Gerber, E.W.

    1995-10-01T23:59:59.000Z

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE`s Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations.

  16. Cultural Resource Program and Curation Services - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management Fermi Site OfficeCoursePublic Safety and Resource

  17. Electric and Hybrid Vehicle Program: Site Operation Program. Quarterly progress report, July--September 1995

    SciTech Connect (OSTI)

    Francfort, J.; Bassett, R.R.; Briasco, S. [and others

    1995-12-01T23:59:59.000Z

    The Site Operator Program has evolved substantially since its inception in response to the Electric Vehicle Research and Demonstration Act of 1976. In its original form, a commercialization effort was intended but this was not feasible for lack of vehicle suppliers and infrastructure. Nonetheless, with DOE sponsorship and technical participation, a few results (primarily operating experience and data) were forthcoming. The current Program comprises eleven sites and over 200 vehicles, of which about 50 are latest generation vehicles. DOE partially funds the Program participant expenditures and the INEL receives operating and maintenance data for the DOE-owned, and participant-owned or monitored vehicles, as well as Program reports. As noted elsewhere in this report, participants represent several widely differing categories: electric utilities, academic institutions, and federal agencies. While both the utilities and the academic institutions tend to establish beneficial relationships with the industrial community.

  18. A Short History of Waste Management at the Hanford Site

    SciTech Connect (OSTI)

    Gephart, Roy E.

    2010-03-31T23:59:59.000Z

    "The world’s first full-scale nuclear reactors and chemical reprocessing plants built at the Hanford Site in the desert of eastern Washington State produced two-thirds of the plutonium generated in the United States for nuclear weapons. Operating these facilities also created large volumes of radioactive and chemical waste, some of which was released into the environment exposing people who lived downwind and downstream. Hanford now contains the largest accumulation of nuclear waste in the Western Hemisphere. Hanford’s last reactor shut down in 1987 followed by closure of the last reprocessing plant in 1990. Today, Hanford’s only mission is cleanup. Most onsite radioactive waste and nuclear material lingers inside underground tanks or storage facilities. About half of the chemical waste remains in tanks while the rest persists in the soil, groundwater, and burial grounds. Six million dollars each day, or nearly two billion dollars each year, are spent on waste management and cleanup activities. There is significant uncertainty in how long cleanup will take, how much it will cost, and what risks will remain for future generations. This paper summarizes portions of the waste management history of the Hanford Site published in the book “Hanford: A Conversation about Nuclear Waste and Cleanup.”(1) "

  19. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation. FY 1993

    SciTech Connect (OSTI)

    Not Available

    1993-01-15T23:59:59.000Z

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94.

  20. Waste Management at the Nevada Test Site Year 2002: Current Status

    SciTech Connect (OSTI)

    Becker, Bruce, D.; Gertz, Carl, P.; Clayton, Wendy, A.; Carilli, Jhon, T.; Crowe, Bruce M.

    2003-02-24T23:59:59.000Z

    The performance attributes of the U. S. Department of Energy's National Nuclear Security Administration Nevada Site Office Low-level Radioactive Waste (LLW) disposal facilities located at the Nevada Test Site transcend those of any other LLW disposal site in the United States. Situated at the southern end of the Great Basin, 244 meters (800 feet) above the water table, the Area 5 Radioactive Waste Management Site (RWMS) has utilized a combination of engineered shallow land disposal cells and deep augured shafts to dispose a variety of waste streams. These include high volume low-activity waste, classified material, and high-specific activity special case waste. Fifteen miles north of Area 5 is the Area 3 RWMS. Here bulk LLW disposal takes place in subsidence craters formed from underground testing of nuclear weapons. Earliest records indicate that documented LLW disposal activities have occurred at the Area 5 and Area 3 RWMSs since 1961 and 1968, respectively. However, these activities have only been managed under a formal program since 1978. This paper describes the technical attributes of the facilities, present and future capacities and capabilities, and provides a description of the process from waste approval to final disposition. The paper also summarizes the current status of the waste disposal operations.

  1. Site Programs & Cooperative Agreements: Hanford | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOriginEducationVideo »UsageSecretary of EnergyFocus GroupSherrellHanford Site Programs &

  2. Site Programs & Cooperative Agreements: Los Alamos and National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOriginEducationVideo »UsageSecretary of EnergyFocus GroupSherrellHanford Site Programs &|

  3. Site Programs & Cooperative Agreements: Waste Isolation Pilot Plant |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOriginEducationVideo »UsageSecretary of EnergyFocus GroupSherrellHanford Site Programs

  4. Site Programs & Cooperative Agreements: West Valley Demonstration Project |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOriginEducationVideo »UsageSecretary of EnergyFocus GroupSherrellHanford Site ProgramsDepartment

  5. Role of performance measures in reengineering U.S. Department of Energy`s management of environmental management programs

    SciTech Connect (OSTI)

    Murthy, K.S.; Harroun, W.P.

    1996-06-01T23:59:59.000Z

    The Rocky Flats Environmental Technology Site (Rocky Flats) contributed to America`s defense up to the end of the Cold War. It is one of several large US Department of Energy (DOE) nuclear industrial facilities, currently undergoing cleanup and closure. The Site was constructed in a sparsely populated area along the Rocky Mountain Foothills, near Denver, in 1952. In the 45 years since, Denver has grown to a major metropolitan area. Over 2 million people live within the Site`s 50-mile radius. The Site is directly upstream of water supplies that serve over 300,000 people. As a result, accelerated cleanup, consolidation, reuse, and closure of the Site are the current essentials. The Site has had three management and operating (M and O) contractors since inception. In keeping with the shift in the Site`s paradigm from one of weapon-parts production program to cleanup and closure project, DOE changed its contracting philosophy for the Site from the M and O type of contract to a Performance-based Incentive Fee Integrating Management contract (PBIF IMC). Doe selected the Site`s fourth contractor as an IMC contractor in July 1995. Kaiser-Hill Company L.L.C. was awarded the contract and assumed IMC responsibility for the Site on July 1, 1995. Integral to this contract is the establishment and implementation of a performance measures system. Performance measures are the bases for incentives that motivate the IMC and the subcontractors working at Rocky Flats. This paper provides an overview of Performance Measures system practiced at Rocky Flats from July 1995 to December 1995. Also described are the developments in reengineering during the July 1995--March 1996 interval.

  6. National Nuclear Security Administration Pantex Site Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B&W Pantex FROM: Johnnie F. Guelker, Assistant Manager for Environmental & Site Engineering Programs SUBJECT: Notice of Approval of an On-Site Sewage Facility Please reference...

  7. Wayne Meitzler PNNL Component Security R&D Program Manager

    E-Print Network [OSTI]

    Perkins, Richard A.

    Wayne Meitzler PNNL Component Security R&D Program Manager Wayne Meitzler, as Pacific Northwest National Laboratory (PNNL) Component Security R&D Program Manager, has over 15 years of cyber security R systems. In the 90s, Wayne was one of the early cyber security R&D leaders at PNNL, and his research

  8. Patty O'Toole July 20, 2007 Program Implementation Manager

    E-Print Network [OSTI]

    Patty O'Toole July 20, 2007 Program Implementation Manager Northwest Power and Conservation Council 200755700-What was Old is New Again: Evaluate Traditional Gears for Selective Harvest Dear Ms. O'Toole defensibility, and adaptive management of hatchery programs. Tools to determine outcomes of proposed actions

  9. Survey of National Programs for Managing High-Level Radioactive

    E-Print Network [OSTI]

    Survey of National Programs for Managing High-Level Radioactive Waste and Spent Nuclear Fuel-Level Radioactive Waste and Spent Nuclear Fuel A Report to Congress and the Secretary of Energy October 2009 #12 Board #12;#12;U.S. Nuclear Waste Technical Review Board Survey of National Programs for Managing High

  10. The Energy Resource Center: On-Site Technical Assistance and Training Programs for Texas School Districts 

    E-Print Network [OSTI]

    Roberts, M.; Sanders, M.

    1988-01-01T23:59:59.000Z

    operators, business managers, and energy managers. Assistance provided through workshop settings includes instruction in setting up board-directed energy programs and the sponsoring of network meetings for school energy managers in several areas of the state...

  11. Hanford Site Beryllium Program: Past, Present, and Future - 12428

    SciTech Connect (OSTI)

    Fisher, Mark [CH2M Hill Plateau Remediation Company, Richland, Washington 99354 (United States); Garcia, Pete [U.S. Department of Energy - Richland Office, Richland, Washington 99352 (United States); Goeckner, Julie [U.S. Department of Energy - HQ, EMCBC, Cincinnati, Ohio 45202 (United States); Millikin, Emily [Washington Closure Hanford, Richland, Washington 99354 (United States); Stoner, Mike [Mission Support Alliance, Richland, Washington 99354 (United States)

    2012-07-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) has a long history of beryllium use because of the element's broad application to many nuclear operations and processes. At the Hanford Site beryllium alloy was used to fabricate parts for reactors, including fuel rods for the N-Reactor during plutonium production. Because of continued confirmed cases of chronic beryllium disease (CBD), and data suggesting CBD occurs at exposures to low-level concentrations, the DOE decided to issue a rule to further protect federal and contractor workers from hazards associated with exposure to beryllium. When the beryllium rule was issued in 1999, each of the Hanford Site contractors developed a Chronic Beryllium Disease Prevention Program (CBDPP) and initial site wide beryllium inventories. A new site-wide CBDPP, applicable to all Hanford contractors, was issued in May, 2009. In the spring of 2010 the DOE Headquarters Office of Health, Safety, and Security (HSS) conducted an independent inspection to evaluate the status of implementation of the Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP). The report identified four Findings and 12 cross-cutting Opportunities for Improvement (OFIs). A corrective action plan (CAP) was developed to address the Findings and crosscutting OFIs. The DOE directed affected site contractors to identify dedicated resources to participate in development of the CAP, along with involving stakeholders. The CAP included general and contractor-specific recommendations. Following initiation of actions to implement the approved CAP, it became apparent that additional definition of product deliverables was necessary to assure that expectations were adequately addressed and CAP actions could be closed. Consequently, a supplement to the original CAP was prepared and transmitted to DOE-HQ for approval. Development of the supplemental CAP was an eight month effort. From the onset a core group of CAP development members were identified to develop a mechanism for assuring that consensus was achieved on products developed as part of the CAP and the closure process. The original CAP was developed based on a large number of actions developed from the HSS report. This was essentially a 'bottoms up' approach. The revised CAP development team concluded that a more holistic, process-based approach was appropriate to assure that the resulting deliverable resulted in a best-in-class product. Consequently, issues and recommendations contained in the HSS report were grouped into 11 program areas, specific product deliverables were identified within each of the program areas, and a work breakdown structure (WBS) was logically applied to number the groupings. While the revised approach to product development utilizes a more holistic, 'top down' approach, the intent was still to incorporate specific recommendations and address specific issues contained in the HSS report. Through implementation of this new approach, a collaborative team has been established that works together using a consensus process for ensuring product completion. Benefits of the new approach include building a level of trust amongst all parties, quality of the products have improved, and acceptance by all parties of what action will truly meet the intent of the deficiency and make the beryllium program stronger. Open dialogue occurs amongst the core Be CAP team members, Hanford contractors, and DOE. It has been a learning process and will continue to be one, but everyone shares the common goal of reducing worker exposure to beryllium. (authors)

  12. Assessment of the facilities on Jackass Flats and other Nevada Test Site facilities for the new nuclear rocket program

    SciTech Connect (OSTI)

    Chandler, G.; Collins, D.; Dye, K.; Eberhart, C.; Hynes, M.; Kovach, R.; Ortiz, R.; Perea, J.; Sherman, D.

    1992-12-01T23:59:59.000Z

    Recent NASA/DOE studies for the Space Exploration Initiative have demonstrated a critical need for the ground-based testing of nuclear rocket engines. Experience in the ROVER/NERVA Program, experience in the Nuclear Weapons Testing Program, and involvement in the new nuclear rocket program has motivated our detailed assessment of the facilities used for the ROVER/NERVA Program and other facilities located at the Nevada Test Site (NTS). The ROVER/NERVA facilities are located in the Nevada Research L, Development Area (NRDA) on Jackass Flats at NTS, approximately 85 miles northwest of Las Vegas. To guide our assessment of facilities for an engine testing program we have defined a program goal, scope, and process. To execute this program scope and process will require ten facilities. We considered the use of all relevant facilities at NTS including existing and new tunnels as well as the facilities at NRDA. Aside from the facilities located at remote sites and the inter-site transportation system, all of the required facilities are available at NRDA. In particular we have studied the refurbishment of E-MAD, ETS-1, R-MAD, and the interconnecting railroad. The total cost for such a refurbishment we estimate to be about $253M which includes additional contractor fees related to indirect, construction management, profit, contingency, and management reserves. This figure also includes the cost of the required NEPA, safety, and security documentation.

  13. Sandia National Laboratories, California Chemical Management Program annual report.

    SciTech Connect (OSTI)

    Brynildson, Mark E.

    2012-02-01T23:59:59.000Z

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Chemical Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Chemical Management Program, one of six programs that supports environmental management at SNL/CA. SNL/CA is responsible for tracking chemicals (chemical and biological materials), providing Material Safety Data Sheets (MSDS) and for regulatory compliance reporting according to a variety of chemical regulations. The principal regulations for chemical tracking are the Emergency Planning Community Right-to-Know Act (EPCRA) and the California Right-to-Know regulations. The regulations, the Hazard Communication/Lab Standard of the Occupational Safety and Health Administration (OSHA) are also key to the CM Program. The CM Program is also responsible for supporting chemical safety and information requirements for a variety of Integrated Enabling Services (IMS) programs primarily the Industrial Hygiene, Waste Management, Fire Protection, Air Quality, Emergency Management, Environmental Monitoring and Pollution Prevention programs. The principal program tool is the Chemical Information System (CIS). The system contains two key elements: the MSDS library and the chemical container-tracking database that is readily accessible to all Members of the Sandia Workforce. The primary goal of the CM Program is to ensure safe and effective chemical management at Sandia/CA. This is done by efficiently collecting and managing chemical information for our customers who include Line, regulators, DOE and ES and H programs to ensure compliance with regulations and to streamline customer business processes that require chemical information.

  14. Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-12-22T23:59:59.000Z

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

  15. Managing Risk in an Athletic Training Education Program

    E-Print Network [OSTI]

    Swann, Elizabeth; Carr, W. David

    2006-01-01T23:59:59.000Z

    Managing Risk in an Athletidraininq Education Program ELIZABETH SWANN, PhD, ATC • Nova Southeastern University W. DAVID CARR, PhD, ATC • University of Kansas R,isk management is defined as "a process designed to prevent losses of all kinds from... depend- ing on their respective universities. Three aspects of risk manage- ment are addressed in this article: assessing and identifying potential risk, planning, and proper documentation. These areas exemplify the importance of the program director...

  16. Pennsylvania Act 38/Nutrient Management Program Technical Manual January 2013

    E-Print Network [OSTI]

    Guiltinan, Mark

    , in consultation with the operator, shall identify and list the Best Management Practices (BMPs) that mustPennsylvania Act 38/Nutrient Management Program Technical Manual January 2013 Appendix 7 Stormwater Control ­ Page 1 Appendix 7 Stormwater Control In the preparation of an Act 38 nutrient management plan

  17. Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    SciTech Connect (OSTI)

    S. E. Rawlinson

    2001-09-01T23:59:59.000Z

    Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in Area 3 and the other is in Area 5) at the Nevada Test Site (NTS) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Operations Office (NNSA/NV). The current DOE Order governing management of radioactive waste is 435.1. Associated with DOE Order 435.1 is a Manual (DOE M 435.1-1) and Guidance (DOE G 435.1-1). The Manual and Guidance specify that preliminary closure and monitoring plans for a low-level waste (LLW) management facility be developed and initially submitted with the Performance Assessment (PA) and Composite Analysis (CA) for that facility. The Manual and Guidance, and the Disposal Authorization Statement (DAS) issued for the Area 3 RWMS further specify that the preliminary closure and monitoring plans be updated within one year following issuance of a DAS. This Integrated Closure and Monitoring Plan (ICMP) fulfills both requirements. Additional updates will be conducted every third year hereafter. This document is an integrated plan for closing and monitoring both RWMSs, and is based on guidance issued in 1999 by the DOE for developing closure plans. The plan does not follow the format suggested by the DOE guidance in order to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. The closure and monitoring plans were integrated because much of the information that would be included in individual plans is the same, and integration provides efficient presentation and program management. The ICMP identifies the regulatory requirements, describes the disposal sites and the physical environment where they are located, and defines the approach and schedule for both closing and monitoring the sites.

  18. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    SciTech Connect (OSTI)

    None

    2012-10-24T23:59:59.000Z

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.

  19. Environmental Restoration Program quality system requirements for the Hanford Site. Revision 2

    SciTech Connect (OSTI)

    Cote, R.F.

    1993-11-01T23:59:59.000Z

    This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment.

  20. The brownfields program: Reclaiming inner-city sites

    SciTech Connect (OSTI)

    Parker, B. [Environmental Industry Associations, Washington, DC (United States)

    1995-10-01T23:59:59.000Z

    Over the past 25 years, enormous environmental resources have been directed through the Comprehensive Environmental Response Compensation and Liability Act (CERCLA), or Superfund, at cleaning up past environmental abuses, while the Resource Conservation and Recovery Act (RCRA) has been the principal federal statute to prevent future abuses to public health and the environment. Only recently, however, has attention turned to a third general area of concern, the redevelopment of abandoned or underutilized land and buildings in many central cities and inner suburbs of US metropolitan areas. In June of this year, the Office of Technology Assessment (OTA) released a report called State of the State on Brownfields: Program for Clean-up and Reuse of Contaminated Sites (OTA Report), in which it was estimated that the size of the problem varies from tens of thousands to nearly 450,000 sites. Many brownfield sites are located in the Northeast and Midwest where, historically, much of the economy was based on heavy industrial activity, although in actuality these brownfields are scattered throughout the entire country.

  1. Policy -Online Business Management Certificate Program

    E-Print Network [OSTI]

    Hanson, Stephen José

    Advisor-Instructor's assignments. Refund Policy (for Online Certificate program only - Lean Six Sigma programs. Grievance Policy If you are a participant in our Online Certificate Program or Lean/Six Sigma

  2. Strategies for Energy Efficient Resource Management of Hybrid Programming Models

    E-Print Network [OSTI]

    1 Strategies for Energy Efficient Resource Management of Hybrid Programming Models Dong Li Member, with the accelerating adoption of hybrid programming models, we increasingly need improved energy efficiency in hybrid hybrid programming models that use both message-passing and shared- memory, due to the increasing

  3. U.S. Department of Energy, Office of Legacy Management Program Update, April-June 2009

    SciTech Connect (OSTI)

    None

    2009-04-01T23:59:59.000Z

    Welcome to the April-June 2009 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Program Update. This publication is designed to provide a status of activities within LM. The Legacy Management goals are: (1) Protect human health and the environment through effective and efficient long-term surveillance and maintenance - This goal highlights DOE's responsibility to ensure long-term protection of people, the environment, and the integrity of engineered remedies and monitoring systems. (2) Preserve, protect, and make accessible legacy records and information - This goal recognizes LM's commitment to successfully manage records, information, and archives of legacy sites under its authority. (3) Support an effective and efficient work force structured to accomplish Departmental missions and assure continuity of contractor worker pension and medical benefits - This goal recognizes DOE's commitment to its contracted work force and the consistent management of pension and health benefits. As sites continue to close, DOE faces the challenges of managing pension plan and health benefits liability. (4) Manage legacy land and assets, emphasizing protective real and personal property reuse and disposition - This goal recognizes a DOE need for local collaborative management of legacy assets, including coordinating land use planning, personal property disposition to community reuse organizations, and protecting heritage resources (natural, cultural, and historical). (5) Improve program effectiveness through sound management - This goal recognizes that LM's goals cannot be attained efficiently unless the federal and contractor work force is motivated to meet requirements and work toward continuous performance improvement.

  4. Waste Management at the Nevada Test Site Fiscal Year 2001 Current Status

    SciTech Connect (OSTI)

    B. D. Becker; W. A. Clayton; B. M. Crowe

    2002-05-01T23:59:59.000Z

    The performance objectives of the U. S. Department of Energy's National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Low-level Radioactive Waste (LLW) disposal facilities located at the Nevada Test Site transcend those of any other radioactive waste disposal site in the United States. Situated at the southern end of the Great Basin, 244 meters (800 feet) above the water table, the Area 5 Radioactive Waste Management Site (RWMS) has utilized a combination of engineered shallow land disposal cells and deep augured shafts to dispose a variety of waste streams. These include high volume low-activity waste, classified radioactive material, and high-specific-activity special case waste. Fifteen miles north of Area 5 is the Area 3 RWMS. Here bulk LLW disposal takes place in subsidence craters formed from underground testing of nuclear weapons. Earliest records indicate that documented LLW disposal activities have occurred at the Area 5 and Area 3 RWMSs since 1961 and 1 968, respectively. However, these activities have only been managed under a formal program since 1978. This paper describes the technical attributes of the facilities, present and future capacities and capabilities, and provides a description of the process from waste approval to final disposition. The paper also summarizes the current status of the waste disposal operations.

  5. Electric and Hybrid Vehicle Program; Site Operator Program. Quarterly progress report, October--December 1991

    SciTech Connect (OSTI)

    Warren, J.F.

    1992-01-01T23:59:59.000Z

    Activities during the first quarter centered around integrating the new participants into the program. A meeting of the Site Operators, in conjunction with the first meeting of the Electric Vehicle Users Task Force, was held in October. A second meeting of the Task Force was held in December. During these meetings the new contractual requirements were explained to the participants. The Site Operator Data Base was distributed and explained. The Site Operators will begin using the data base in December 1991 and will supply the operating and maintenance data to the INEL on a monthly basis. The Operators requested that they be able to have access to the data of the other Operators and it was agreed that they would be provided this on floppy disk monthly from the INEL. Presentations were made to the DOE sponsored Automotive Technology Development-Contractors Coordination Meeting in October. An overview of the program was given by EG&G. Representatives from Arizona Public Service, Texas A&M University, and York Technical College provided details of their programs and the results and future goals. Work was begun on commercializing the Versatile Data Acquisition System (VDAS). A Scope of Work has been written for a Cooperative Research and Development Agreement (CRADA) to be submitted to the USABC. If implemented, the CRADA will provide funds for the development and commercialization of the VDAS. Participants in the Site Operator Program will test prototypes of the system within their fleets, making the data available to the USABC and other interested organizations. The USABC will provide recommendations on the data to be collected. Major activities by the majority of the Operators were involved with the continued operation and demonstration of existing vehicles. In addition, several of the operators were involved in identifying and locating vehicles to be added to their fleets. A list of the vehicles in each Site Operator fleet is included as Appendix A to this report.

  6. New Mexico state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    none,

    2014-12-31T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  7. What`s new in federal energy management: FEMP program overview. FEMP Renewable Energy Program

    SciTech Connect (OSTI)

    NONE

    1996-08-01T23:59:59.000Z

    As the owner or manager of more than 500,000 facilities, the US government has a superb opportunity to reduce fuel imports and improve environmental quality by using renewable sources of energy. In many Federal applications -- such as irrigation, water heating, indoor and outdoor lighting, or communications -- commercially available renewable technologies are often the most cost-effective option for supplying the needed energy, and they are environmentally friendly. The US Department of Energy, Federal Energy Management Program (FEMP) helps Federal agencies take advantage of the benefits offered by renewable technologies and apply the renewable provisions of the Energy Policy Act (EPAct) and Executive Order 12902. FEMP`s Renewable Energy Program educates Federal agencies about renewable opportunities and helps agencies implement successful renewable projects. And the opportunities are abundant. In new construction projects, for example, planners can optimize facility energy performance by incorporating renewable energy and energy efficiency measures early in the design process. Renewables are cost-effective in many retrofit projects. They are the clear choice for many remote sites that utility-supplied power does not reach. Their environmental advantages include either zero or reduced air emissions compared with conventional energy sources and no risk of fuel spills.

  8. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan - VOLUMES 1-3

    SciTech Connect (OSTI)

    Gerber, E.W.

    1996-09-23T23:59:59.000Z

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE's DNFSB Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. These additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs supported formulation of the initial versions of the Integrated Facilities Plan and the Research and Development Plan. The SISMPs are periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations. This document constitutes the Hanford SISMP. This document includes the planned work scope, costs and schedules for activities at the Hanford site to implement the DNFSB Recommendation 94-1 IPP.

  9. Pennsylvania Act 38/Nutrient Management Program/Technical Manual January 2013

    E-Print Network [OSTI]

    Guiltinan, Mark

    requirements for agronomic crops, fertilizer materials, manure nutrient management, and manure spreaderPennsylvania Act 38/Nutrient Management Program/Technical Manual January 2013 Supplement 18 Nutrient Management Education Program Resource List ­ Page 1 Supplement 18 Nutrient Management Education

  10. Programs of the Governor's Energy Management Center

    E-Print Network [OSTI]

    Verdict, M.

    1988-01-01T23:59:59.000Z

    The 70th Texas Legislature transferred the Energy Efficiency Division of the Public Utility Commission to the Governor's Office in September 1987 and directed the Governor's Energy Management Center (GEMC) to perform energy management services...

  11. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement. Volume 1, Appendix B: Idaho National Engineering Laboratory Spent Nuclear Fuel Management Program

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    The US Department of Energy (DOE) has prepared this report to assist its management in making two decisions. The first decision, which is programmatic, is to determine the management program for DOE spent nuclear fuel. The second decision is on the future direction of environmental restoration, waste management, and spent nuclear fuel management activities at the Idaho National Engineering Laboratory. Volume 1 of the EIS, which supports the programmatic decision, considers the effects of spent nuclear fuel management on the quality of the human and natural environment for planning years 1995 through 2035. DOE has derived the information and analysis results in Volume 1 from several site-specific appendixes. Volume 2 of the EIS, which supports the INEL-specific decision, describes environmental impacts for various environmental restoration, waste management, and spent nuclear fuel management alternatives for planning years 1995 through 2005. This Appendix B to Volume 1 considers the impacts on the INEL environment of the implementation of various DOE-wide spent nuclear fuel management alternatives. The Naval Nuclear Propulsion Program, which is a joint Navy/DOE program, is responsible for spent naval nuclear fuel examination at the INEL. For this appendix, naval fuel that has been examined at the Naval Reactors Facility and turned over to DOE for storage is termed naval-type fuel. This appendix evaluates the management of DOE spent nuclear fuel including naval-type fuel.

  12. Waste Management Program. Technical progress report, October-December 1982

    SciTech Connect (OSTI)

    None

    1983-07-01T23:59:59.000Z

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, in situ storage or disposal, waste from development and characterization, process and equipment development, and low-level waste management are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  13. Department of Energy Personal Property Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-03-30T23:59:59.000Z

    The order sets forth requirements for personal property management and accountability. Admin Chg 1, dated 10-22-12.

  14. Hanford Site Protective Barrier Development Program: Fiscal year 1990 highlights

    SciTech Connect (OSTI)

    Cadwell, L.L. (ed.)

    1991-09-01T23:59:59.000Z

    The Hanford Site Protective Barrier Development Program was jointly developed by Pacific Northwest Laboratory (PNL) and Westinghouse Hanford Company (WHC) to design and test an earthen cover system(s) that can be used to inhibit water infiltration; plant, animal, and human intrusion; and wind and water erosion. The joint PNL/WHC program was initiated in FY 1986. To date, research findings support the initial concepts of barrier designs for the Hanford Site. A fine-soil surface is planned to partition surface water into runoff and temporary storage. Transpiration by vegetation that grows in the fine-soil layer will return stored water to the atmosphere as will surface evaporation. A capillary break created by the interface of the fine-soil layer and coarser textured materials below will further limit the downward migration of surface water, making it available over a longer period of time for cycling to the atmosphere. Should water pass the interface, it will drain laterally through a coarse textured sand/gravel layer. Tested barrier designs appear to work adequately to prevent drainage under current and postulated wetter-climate (added precipitation) conditions. Wind and water erosion tasks are developing data to predict the extent of erosion on barrier surfaces. Data collected during the last year confirm the effectiveness of small burrowing animals in removing surface water. Water infiltrating through burrows of larger mammals was subsequently lost by natural processes. Natural analog and climate change studies are under way to provide credibility for modeling the performance of barrier designs over a long period of time and under shifts in climate. 10 refs., 30 figs.

  15. Peer Review of the Federal Energy Management Program Energy-Efficient...

    Broader source: Energy.gov (indexed) [DOE]

    Peer Review of the Federal Energy Management Program Energy-Efficient Product Procurement Portfolio Peer Review of the Federal Energy Management Program Energy-Efficient Product...

  16. Review of present groundwater monitoring programs at the Nevada Test Site

    SciTech Connect (OSTI)

    Hershey, R.L.; Gillespie, D.

    1993-09-01T23:59:59.000Z

    Groundwater monitoring at the Nevada Test Site (NTS) is conducted to detect the presence of radionuclides produced by underground nuclear testing and to verify the quality and safety of groundwater supplies as required by the State of Nevada and federal regulations, and by U.S. Department of Energy (DOE) Orders. Groundwater is monitored at water-supply wells and at other boreholes and wells not specifically designed or located for traditional groundwater monitoring objectives. Different groundwater monitoring programs at the NTS are conducted by several DOE Nevada Operations Office (DOE/NV) contractors. Presently, these individual groundwater monitoring programs have not been assessed or administered under a comprehensive planning approach. Redundancy exists among the programs in both the sampling locations and the constituents analyzed. Also, sampling for certain radionuclides is conducted more frequently than required. The purpose of this report is to review the existing NTS groundwater monitoring programs and make recommendations for modifying the programs so a coordinated, streamlined, and comprehensive monitoring effort may be achieved by DOE/NV. This review will be accomplished in several steps. These include: summarizing the present knowledge of the hydrogeology of the NTS and the potential radionuclide source areas for groundwater contamination; reviewing the existing groundwater monitoring programs at the NTS; examining the rationale for monitoring and the constituents analyzed; reviewing the analytical methods used to quantify tritium activity; discussing monitoring network design criteria; and synthesizing the information presented and making recommendations based on the synthesis. This scope of work was requested by the DOE/NV Hydrologic Resources Management Program (HRMP) and satisfies the 1993 (fiscal year) HRMP Groundwater Monitoring Program Review task.

  17. LBNL/PUB-5519 (1), Rev. 4 Issues Management Program Manual

    E-Print Network [OSTI]

    LBNL/PUB-5519 (1), Rev. 4 Issues Management Program Manual ISSUES MANAGEMENT PROGRAM MANUAL LBNL Lawrence Berkeley National Laboratory #12;LBNL/PUB-5519 (1), Rev. 4 Page 2 of 37 Issues Management Program;LBNL/PUB-5519 (1), Rev. 4 Page 3 of 37 Issues Management Program Manual TABLE OF CONTENTS 1.0 Program

  18. PIA - Savannah River Site Management and Operating Contractor...

    Energy Savers [EERE]

    Management and Operating Contractor (HRMS) More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) Integrated Safety...

  19. Office of Civilian Radioactive Waste Management Program Cost and Schedule Baseline; Revision 3

    SciTech Connect (OSTI)

    NONE

    1992-09-01T23:59:59.000Z

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive (Level 0) and Program (Level 1) Change Control Boards (CCBS) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD), the Waste Management System Requirements (WMSR), and the Physical System Requirements documents provide the technical basis for the PCSB. Changes to the PCSB will be approved by the Pregrain Change Control Board (PCCB)In addition to the PCCB, the Energy System Acquisition Advisory Board Baseline CCB (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project and the Monitored Retrievable Storage (MRS) Project.

  20. Security and Emergency Management Independent Oversight and Performance Assurance Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-03-01T23:59:59.000Z

    Establishes the DOE Security and Emergency Management Independent Oversight and Performance Assurance Program. Cancels DOE O 470.2, Paragraph 5b(2) of DOE O 231.1 and Chapter IV of DOE M 231.1-1.

  1. Applying stochastic programming models in financial risk management 

    E-Print Network [OSTI]

    Yang, Xi

    2010-01-01T23:59:59.000Z

    This research studies two modelling techniques that help seek optimal strategies in financial risk management. Both are based on the stochastic programming methodology. The first technique is concerned with market risk ...

  2. Linear Dynamic Programs for Resource Management Marek Petrik

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    a river reservoir to produce hydroelectric power. Among renewable sources, hydroelectricity has the lowest management can therefore significantly reduce carbon emissions. Hydroelectric power is usually produced dynamic programming, a method used to optimize hydroelectric systems. 1 Introduction Sequential decision

  3. EIS-0097: Bonneville Power Administration Transmission Facilities Vegetation Management Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Bonneville Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with implementing a vegetation management program.

  4. Data Management in the LoanSTAR Program

    E-Print Network [OSTI]

    Lopez, R. E.; Haberl, J. S.

    This paper discusses the complexity of managing building energy usage data for many buildings. The history and methodology of data collection at the Texas LoanSTAR Monitoring and Analysis Program, a large multimillion dollar project, is given...

  5. Acting Biomass Program Manager Dr. Valerie Reed to Host Live...

    Broader source: Energy.gov (indexed) [DOE]

    December 16th, the Energy Department (@energy) will be hosting a live Twitter Q&A on biofuels with Dr. Valerie Reed, Acting Manager of the Biomass Program. Dr. Reed holds a Ph. D....

  6. Safeguards and Security for Program and Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-11-15T23:59:59.000Z

    This Guide provides approaches for implementing security provisions within the functional areas contained in DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets. Canceled by DOE G 413.3-3A.

  7. Energy Use Analysis for the Federal Energy Management Program 

    E-Print Network [OSTI]

    Mazzucchi, R. P.; Devine, K. D.

    1988-01-01T23:59:59.000Z

    -efficient, the Federal Energy Management Program (FEMP) endeavors to improve the technical basis for such performance-based contracting. Specific tasks include the development of improved energy use baselining methods, refinement of a simplified energy analysis method...

  8. The Guide to Lean Enablers for Managing Engineering Programs

    E-Print Network [OSTI]

    Oehmen, Josef

    This document provides the findings of the Joint MIT?PMI?INCOSE Lean in Program Management Community of Practice that are based on a 1?year project executed during 2011 and 2012. The community was made up of selected subject ...

  9. Information Technology Standards Program management plan

    SciTech Connect (OSTI)

    NONE

    1998-05-01T23:59:59.000Z

    This document presents a logical and realistic plan to implement the Information Technology (IT) Standards Program throughout the Department of Energy (DOE). It was developed by DOE Chief Information Officer (CIO) staff, with participation from many other individuals throughout the DOE complex. The DOE IT Standards Program coordinates IT standards activities Department-wide, including implementation of standards to support the DOE Information Architecture. The Program is voluntary, participatory, and consensus-based. The intent is to enable accomplishment of the DOE mission, and the Program is applicable to all DOE elements, both Federal and contractor. The purpose of this document is to describe the key elements of the DOE IT Standards Program.

  10. Fuel Cell Demonstration Program - Central and Remote Sites 2003

    SciTech Connect (OSTI)

    Gerald Brun

    2006-09-15T23:59:59.000Z

    In an effort to promote clean energy projects and aid in the commercialization of new fuel cell technologies, the Long Island Power Authority (LIPA) initiated a Fuel Cell Demonstration Program in 1999 with six month deployments of Proton Exchange Membrane (PEM) non-commercial Beta model systems at partnering sites throughout Long Island. These projects facilitated significant developments in the technology, providing operating experience that allowed the manufacturer to produce fuel cells that were half the size of the Beta units and suitable for outdoor installations. In 2001, LIPA embarked on a large-scale effort to identify and develop measures that could improve the reliability and performance of future fuel cell technologies for electric utility applications and the concept to establish a fuel cell farm (Farm) of 75 units was developed. By the end of October of 2001, 75 Lorax 2.0 fuel cells had been installed at the West Babylon substation on Long Island, making it the first fuel cell demonstration of its kind and size anywhere in the world at the time. Designed to help LIPA study the feasibility of using fuel cells to operate in parallel with LIPA's electric grid system, the Farm operated 120 fuel cells over its lifetime of over 3 years including 3 generations of Plug Power fuel cells (Lorax 2.0, Lorax 3.0, Lorax 4.5). Of these 120 fuel cells, 25 Lorax 4.5 units operated under this Award from April 2003 to December 2004. In parallel with the operation of the Farm, LIPA recruited government, commercial, and residential customers to demonstrate fuel cells as on-site distributed generation. The deployment of the 20 Lorax 4.5 units for the Remote Sites phase of the project began in October 2004. To date, 10 fuel cells have completed their demonstrations while 10 fuel cells are currently being monitored at various customer sites throughout Long Island. As of June 30, 2006 the 45 fuel cells operating under this Award produced a total of 1,585,093 kWh. As fuel cell technology became more mature, performance improvements included increases in system efficiency and availability. Including equipment, design, fuel, maintenance, installation, and decommissioning the total project budget was approximately $3.7 million.

  11. PhD in Management The PhD program in Management is

    E-Print Network [OSTI]

    Stuart, Steven J.

    PhD in Management The PhD program in Management is designed to provide advanced education. The aim of the PhD track in Supply Chain and Operations Management (SCOM) is to develop academics who organizational competitiveness. The PhD track in Information Systems (IS) focuses on cutting edge IS research

  12. Department of Energy Personal Property Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-03-30T23:59:59.000Z

    The order sets forth requirements for personal property management and accountability. Admin Chg 1, dated 10-22-12, cancels DOE O 580.1A.

  13. Federal Energy Management Program Organization Chart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Legislative Affairs, Technology Deployment Nicolas Baker FEMP Website Joe Konrade O&M, Energy Security Cyrus Nasseri Interagency Coordination, Data Management Chris Tremper...

  14. Power Marketing Administration Emergency Management Program Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-18T23:59:59.000Z

    This Manual establishes emergency management policy and requirements for emergency planning, preparedness, readiness assurance, and response for the Department's Power Marketing Administrations. Cancels DOE O 5500.11.

  15. Storm Water Management Plan Program (Nebraska)

    Broader source: Energy.gov [DOE]

    This legislation implements the National Pollutant Discharge Elimination System Requirements, and encourages cities and counties to create stormwater management plans in order to receive grant...

  16. Solid Waste Management Policy and Programs (Minnesota)

    Broader source: Energy.gov [DOE]

    These statutes encourage the State and local governments to develop waste management strategies to achieve the maximum possible reduction in waste generation, eliminate or reduce adverse...

  17. International Energy Agency Implementing Agreements and Annexes: A Guide for Building Technologies Program Managers

    E-Print Network [OSTI]

    Evans, Meredydd

    2008-01-01T23:59:59.000Z

    Energy, Washington, DC. Demand Side Management ImplementingEnergy Agency Demand Side Management Programme. Task XIII:Energy Agency Demand Side Management Program. Task XIII:

  18. Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-10T23:59:59.000Z

    To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

  19. Power Reserve Management by Two-Stage Stochastic Programming

    E-Print Network [OSTI]

    reserve management becomes important. Previous studies indicate that power optimization problems can of stochastic programming to a power reserve management problem. Very often power optimization problems involve considerable attention. Examples on hydro-thermal power production planning are [4], [6] and [9]. Both problems

  20. University of Exeter Site Manager Manual Creating links 1 University of Exeter Web Team, January 2012

    E-Print Network [OSTI]

    Bearhop, Stuart

    University of Exeter Site Manager Manual Creating links 1 University of Exeter Web Team, January postgraduates' accommodation page.' Avoid using URLs for links in web page text. It is best practice to use of Exeter Site Manager Manual Creating links 2 University of Exeter Web Team, January 2012 Creating links

  1. Report on audit of the Richland Operations Office Site Characterization Program

    SciTech Connect (OSTI)

    NONE

    1995-03-01T23:59:59.000Z

    In 1989 the Secretary of Energy changed the mission of the Richland Operations Office (ROO) from supporting weapons production to environmental restoration and waste management. Through the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), ROO was required to survey Hanford for contaminants, analyze samples, and determine the most cost-effective method to clean up the waste identified. The objective of this audit was to determine if the Department of Energy (DOE) and ROO had evaluated alternatives to accomplish certain site characterization activities in a cost-effective manner. This audit showed that neither the DOE nor ROO evaluated alternatives to ensure that two site characterization activities were accomplished in a cost-effective manner. First, DOE accelerated the core sampling program for high-level radioactive waste tanks from 6 to 3 years. DOE made this decision in response to a Defense Nuclear Facilities Safety Board (Safety Board) recommendation without first determining if the method chosen (core sampling) was the most efficient and economical method to satisfy the Safety Board`s concerns. This 3-year acceleration would cost over $71 million with little increase in benefits. Second, ROO agreed to a Tri-Party Agreement Amendment to require low-level waste samples be analyzed within 25 miles of Hanford. ROO estimated that the 25-mile restriction will require an additional $46 million over an 8-year period. It is recommended that DOE (1) notify the appropriate parties that characterization of the high-level radioactive waste tanks will be completed in the most cost-effective method to achieve program objectives, and (2) negotiate to remove the requirement to perform 80% of low-level waste sample analyses within 25 miles of Hanford. It is also recommended that management perform economic analyses of alternatives before making decisions as to how program objectives will be accomplished.

  2. Technical Qualification Program Self-Assessment Report- Pacific Northwest Site Office- 2013

    Broader source: Energy.gov [DOE]

    This self-assessment evaluated how well the Technical Qualification and Federal Capability Programs were implemented at the Pacific Northwest Site Office (PNSO).

  3. 2008 Federal Energy Management Program (FEMP) Market Report

    SciTech Connect (OSTI)

    Tremper, C.

    2009-07-01T23:59:59.000Z

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  4. Guidelines for Developing Soil and Water Management Programs: Irrigated Pecans

    E-Print Network [OSTI]

    Miyamoto, S.

    Guidelines for Developing Soil and Water Management Programs: Irrigated Pecans Agricultural Research and Extension Center at El Paso March 2002 Texas Agricultural Experiment Station The Texas A&M University System Texas Water Resources Institute... by soil and water testing and appraisal, and evaluation of soil improvement options. Finally, orchard management practices, such as soil and irrigation management, fertilization and weed control should be fine- tuned. The significance of each measure may...

  5. U.S. Department of Energy Office of Legacy Management Legacy Uranium Mine Site Reclamation - Lessons Learned - 12384

    SciTech Connect (OSTI)

    Kilpatrick, Laura E. [U.S. Department of Energy Office of Legacy Management, Westminster, Colorado 80021 (United States); Cotter, Ed [S.M. Stoller Corporation, Grand Junction, Colorado 81503 (United States)

    2012-07-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) Office of Legacy Management is responsible for administering the DOE Uranium Leasing Program (ULP) and its 31 uranium lease tracts located in the Uravan Mineral Belt of southwestern Colorado (see Figure 1). In addition to administering the ULP for the last six decades, DOE has also undertaken the significant task of reclaiming a large number of abandoned uranium (legacy) mine sites and associated features located throughout the Uravan Mineral Belt. In 1995, DOE initiated a 3-year reconnaissance program to locate and delineate (through extensive on-the-ground mapping) the legacy mine sites and associated features contained within the historically defined boundaries of its uranium lease tracts. During that same time frame, DOE recognized the lack of regulations pertaining to the reclamation of legacy mine sites and contacted the U.S. Bureau of Land Management (BLM) concerning the reclamation of legacy mine sites. In November 1995, The BLM Colorado State Office formally issued the United States Department of the Interior, Colorado Bureau of Land Management, Closure/Reclamation Guidelines, Abandoned Uranium Mine Sites as a supplement to its Solid Minerals Reclamation Handbook (H-3042-1). Over the next five-and-one-half years, DOE reclaimed the 161 legacy mine sites that had been identified on DOE withdrawn lands. By the late 1990's, the various BLM field offices in southwestern Colorado began to recognize DOE's experience and expertise in reclaiming legacy mine sites. During the ensuing 8 years, BLM funded DOE (through a series of task orders) to perform reclamation activities at 182 BLM mine sites. To date, DOE has reclaimed 372 separate and distinct legacy mine sites. During this process, DOE has learned many lessons and is willing to share those lessons with others in the reclamation industry because there are still many legacy mine sites not yet reclaimed. DOE currently administers 31 lease tracts (11,017 ha) that collectively contain over 220 legacy (abandoned) uranium mine sites. This contrasts to the millions of hectares administered by the BLM, the U.S. Forest Service, and other federal, tribal, and state agencies that contain thousands of such sites. DOE believes that the processes it has used provide a practical and cost-effective approach to abandoned uranium mine-site reclamation. Although the Federal Acquisition Regulations preclude DOE from competing with private industry, DOE is available to assist other governmental and tribal agencies in their reclamation efforts. (authors)

  6. Human Capital Management Accountability Program (HCMAP) | Department...

    Energy Savers [EERE]

    HR metrics that assist human resources professionals in identifying program and organizational discrepancies. Documents Available for Download May 30, 2014 DOE Plan for 2302(c)...

  7. Austin Energy- Commercial Energy Management Rebate Program

    Broader source: Energy.gov [DOE]

    Austin Energy offers incentives for commercial customers to increase the energy efficiency of facilities through the Commercial Rebate Program. Rebates are available for qualified HVAC equipment,...

  8. EL Program: Smart Grid Program Manager: George Arnold, Designated Goal Liaison; David Wollman,

    E-Print Network [OSTI]

    Magee, Joseph W.

    EL Program: Smart Grid Program Manager: George Arnold, Designated Goal Liaison; David Wollman, Smart Grid and Cyber-Physical Systems Program Office, Engineering Laboratory Office, x2433; Dean and power flows, and additional advancements to create a smart grid. In response to a mandate given

  9. FORESTRY FIELD PROGRAM Department of Environmental Science, Policy & Management

    E-Print Network [OSTI]

    Wildermuth, Mary C

    1 FORESTRY FIELD PROGRAM Department of Environmental Science, Policy & Management University of California, Berkeley June 22 - August 15, 2014 Goals and Objectives: The overall goal of the Summer Forestry' subsequent on-campus academic studies. Specific objectives of the Forestry Field Program include: · Provide

  10. Morgridge Center for Public Service Development Program Intern: Data Management

    E-Print Network [OSTI]

    Wisconsin at Madison, University of

    Morgridge Center for Public Service Development Program Intern: Data Management This internship provides an exciting opportunity to be part of a new development program for a growing center on the UW-Madison campus. The mission of the Morgridge Center for Public Service is to connect campus with community

  11. Program Academic Quality Plan Department of Construction Management

    E-Print Network [OSTI]

    Moore, Paul A.

    Program Academic Quality Plan Department of Construction Management Bowling Green State University://www.bgsu.edu/colleges/technology/undergraduate/cmt/index.html Integral in this effort is our Program Academic Quality Plan. I. Bowling Green State University Mission Bowling Green State University provides educational experiences inside and outside the classroom

  12. Dissertation Proposal Form Ph.D. in Management Program

    E-Print Network [OSTI]

    Lin, Xiaodong

    Dissertation Proposal Form Ph.D. in Management Program Rutgers Business School ­ Newark and New four weeks in advance: Ask the Program Director to appoint your dissertation committee. The request can@rbsmail.rutgers.edu) and attach a cv for the proposed outside member. For more information, read Dissertation on the Policies

  13. Characterization Report for the 92-Acre Area of the Area 5 Radioactive Waste Management Site, Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    Bechtel Nevada; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2006-06-01T23:59:59.000Z

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office manages two low-level Radioactive Waste Management Sites at the Nevada Test Site. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. This report summarizes characterization and monitoring work pertinent to the 92-Acre Area in the southeast part of the Area 5 Radioactive Waste Management Sites. The decades of characterization and assessment work at the Area 5 RWMS indicate that the access controls, waste operation practices, site design, final cover design, site setting, and arid natural environment contribute to a containment system that meets regulatory requirements and performance objectives for the short- and long-term protection of the environment and public. The available characterization and Performance Assessment information is adequate to support design of the final cover and development of closure plans. No further characterization is warranted to demonstrate regulatory compliance. U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is proceeding with the development of closure plans for the six closure units of the 92-Acre Area.

  14. Residential Load Management Program and Pilot

    E-Print Network [OSTI]

    Haverlah, D.; Riordon, K.

    1994-01-01T23:59:59.000Z

    was suspended in 1989 because of defects with the cycling switch printed circuit boards. While these problems were corrected in 1989 and 1990, it was decided to leave the program on hold and conduct engineering tests to determine program impacts. In addition...

  15. Development of Physical Protection Regulations for Rosatom State Corporation Sites under the U.S.-Russian MPC&A Program

    SciTech Connect (OSTI)

    Izmaylov, Alexander; Babkin, Vladimir; Shemigon, Nikolai N.; O'Brien, Patricia; Wright, Troy L.; Hazel, Michael J.; Tuttle, John D.; Cunningham, Mitchel E.; Lane, Melinda; Kovchegin, Dmitry

    2012-07-14T23:59:59.000Z

    This paper describes issues related to upgrading the physical protection regulatory basis for Rosatom State Corporation sites. It is underlined that most of the regulatory and methodological documents for this subject area have been developed under the U.S.-Russian MPC&A Program. According to the joint management plan developed and agreed upon by the parties in 2005, nearly 50 physical protection documents were identified to be developed, approved and implemented at Rosatom sites by 2012. It is also noted that, on the whole, the plans have been fulfilled.

  16. 2001 ''You Have the Power'' campaign [Federal Energy Management Program]. Final technical report

    SciTech Connect (OSTI)

    NONE

    2002-01-01T23:59:59.000Z

    The Tasks of 2001 ''You Have the Power'' campaign by the Federal Energy Management Program (FEMP) are: Task 1--Interagency Planning Meetings; Task 2--Ear Day Event; Task 3--Earth Day and Energy Awareness Month Activities; Task 4--Regional Target; Task 5--Outreach Tools and Campaign Products; Task 6--Private Sector Participation; Task 7--''You Have the Power'' on the FEMP Web Site; and Task 8--Effective Communications.

  17. Waste Management Program. Technical progress report, Aporil-June 1983

    SciTech Connect (OSTI)

    None

    1984-02-01T23:59:59.000Z

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant. The studies on environmental and safety assessments, process and equipment development, TRU waste, and low-level waste are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  18. Department of Energy Personal Property Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-12-07T23:59:59.000Z

    This Order provides responsibilities and requirements for personal property management at the Department. Change 1, dated 5-8-08, includes responsibilities for heads of Departmental elements to be accountable for personal property inventories. Cancels DOE O 580.1.

  19. Department of Energy Personal Property Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-12-07T23:59:59.000Z

    This Order provides responsibilities and requirements for personal property management at the Department. Change 1, dated 5-8-08, includes responsibilities for heads of Departmental elements to be accountable for personal property inventories.

  20. Power Marketing Administration Emergency Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1994-05-09T23:59:59.000Z

    To establish specific emergency management policy and requirements for the Department of Energy Power Marketing Administration appropriate to their specific regional power missions. This directive does not cancel another directive. Canceled by DOE M151.1-1.

  1. FEMA Emergency Management Performance Grant Program | Department...

    Energy Savers [EERE]

    for all hazards, as authorized by Section 662 of the Post Katrina Emergency Management Reform Act (6 U.S.C. sect. 762) and the Robert T. Stafford Disaster Relief and Emergency...

  2. A study of participative management programs 

    E-Print Network [OSTI]

    Harms, Robert Arthur

    1972-01-01T23:59:59.000Z

    Other Companies CHAPTER III INTERVIEWS Texas Instruments . ~ United. Services Automobile Association Proctor 8 Gamble ~ A Texas Chemical Plant CHAPTER IV 16 17 22 29 $6 $8 40 41 45 50 58 COMPARISONS... management. It provides a synopsis of the published cases of two electronics manufacturers, a public utility company, and a chemical plant which have implemented participative management. With few exceptions, these reports depict it as an almost flaw...

  3. What`s new in federal energy management: FEMP program overview. Federal Energy Management Program

    SciTech Connect (OSTI)

    NONE

    1996-08-01T23:59:59.000Z

    The US government has an enormous cost-saving opportunity as the largest energy user in the world. In 1994, the government spent $8 billion for its 500,000 buildings, it vehicles, and process energy. The US Department of Energy (DOE), Federal Energy Management Program (FEMP) reduces the cost of government and makes it work better through energy efficiency, use of renewable energy, and water conservation. FEMP leads Federal energy efficiency efforts and helps Federal energy managers identify and procure the best, most cost-effective energy-saving projects. It does this through proactive problem solving; an aggressive emphasis on increasing the number and quality of projects; and effective partnerships among agencies, utilities, the private sector, and states. Partnerships lead to increased motivation and education and reduced barriers to successful procurement. As the lead organization implementing legislation and Presidential direction for Federal energy efficiency, FEMP administers an interagency energy committee and task force and collaborates with the DOE national energy laboratories. FEMP works with energy service companies, energy savings product manufacturers, and utilities. This partnership will lead to a $1 billion investment by companies willing to invest in return for a share of the energy cost savings. With FEMP project financing, audits, training and technical assistance, and new technology demonstrations, agencies overcome obstacles to achieving widespread energy efficiency.

  4. Environmental Management System 2 2013 SITE ENVIRONMENTAL REPORT2-1

    E-Print Network [OSTI]

    System (ISMS) integrates environment, safety, and health management into all work planning and execution.4, Safety Management System Policy, are: § DEFINE THE SCOPE OF WORK: Missions are translated into workEnvironmental Management System 2 2013 SITE ENVIRONMENTAL REPORT2-1 One of Brookhaven National

  5. Environmental Management System 2 2011 SITE ENVIRONMENTAL REPORT2-1

    E-Print Network [OSTI]

    , and health management into all work planning and execution. The purpose of BNL's ISMS is to ensure MANAGEMENT SYSTEM IDENTIFY AND ANALYZE HAZARDS ASSOCI- ATED WITH THE WORK: Hazards associated with the workEnvironmental Management System 2 2011 SITE ENVIRONMENTAL REPORT2-1 One of Brookhaven National

  6. Environmental Management System 2 2012 SITE ENVIRONMENTAL REPORT2-1

    E-Print Network [OSTI]

    management into all work planning and execution. The purpose of BNL's ISMS is to ensure that the way we do MANAGEMENT SYSTEM IDENTIFY AND ANALYZE HAZARDS ASSOCI- ATED WITH THE WORK: Hazards associated with the workEnvironmental Management System 2 2012 SITE ENVIRONMENTAL REPORT2-1 One of Brookhaven National

  7. Nevada Test 1999 Waste Management Monitoring Report, Area 3 and Area 5 radioactive waste management sites

    SciTech Connect (OSTI)

    Yvonne Townsend

    2000-05-01T23:59:59.000Z

    Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS). These monitoring data include radiation exposure, air, groundwater, meteorology, vadose zone, and biota data. Although some of these media (radiation exposure, air, and groundwater) are reported in detail in other Bechtel Nevada reports (Annual Site Environmental Report [ASER], the National Emissions Standard for Hazardous Air Pollutants [NESHAP] report, and the Annual Groundwater Monitoring Report), they are also summarized in this report to provide an overall evaluation of RWMS performance and environmental compliance. Direct radiation monitoring data indicate that exposure at and around the RWMSs is not above background levels. Air monitoring data indicate that tritium concentrations are slightly above background levels, whereas radon concentrations are not above background levels. Groundwater monitoring data indicate that the groundwater in the alluvial aquifer beneath the Area 5 RWMS has not been affected by the facility. Meteorology data indicate that 1999 was a dry year: rainfall totaled 3.9 inches at the Area 3 RWMS (61 percent of average) and 3.8 inches at the Area 5 RWMS (75 percent of average). Vadose zone monitoring data indicate that 1999 rainfall infiltrated less than one foot before being returned to the atmosphere by evaporation. Soil-gas tritium data indicate very slow migration, and tritium concentrations in biota were insignificant. All 1999 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing as expected at isolating buried waste.

  8. Testimonials: Presidents Management Council Interagency Rotational Program

    Broader source: Energy.gov [DOE]

    The PMC Program is an outstanding professional opportunity that I would recommend to friends and colleagues.  Because I have worked for the Department of Education for the majority of my federal...

  9. Environmental Management at the Nevada Test Site Year 2001 Current Status

    SciTech Connect (OSTI)

    Becker, B. D.; Gertz, C. P.; Clayton, W. A.; Carilli, J. T.; DiSanza, E. F.; Wycoff, R. C.; Crowe, B. M.

    2002-02-26T23:59:59.000Z

    The performance objectives of the U. S. Department of Energy's National Nuclear Security Administration Nevada Operations Office Low-level Radioactive Waste (LLW) disposal facilities located at the Nevada Test Site transcend those of any other radioactive waste disposal site in the United States. Situated at the southern end of the Great Basin, 244 meters (800 feet) above the water table, the Area 5 Radioactive Waste Management Site (RWMS) has utilized a combination of engineered shallow land disposal cells and deep augured shafts to dispose a variety of waste streams. These include high volume low-activity waste, classified material, and high-specific-activity special case waste. Fifteen miles north of Area 5 is the Area 3 RWMS. Here bulk LLW disposal takes place in subsidence craters formed from underground testing of nuclear weapons. Earliest records indicate that documented LLW disposal activities have occurred at the Area 5 and Area 3 RWMSs since 1961 and 1968, respectively. However, these activities have only been managed under a formal program since 1978. This paper describes the technical attributes of the facilities, present and future capacities and capabilities, and provides a description of the process from waste approval to final disposition. The paper also summarizes the current status of the waste disposal operations. Additionally, the Nevada Operations Office Environmental Restoration Division is responsible for identifying the nature and extent of contamination; determining its potential risk to the public and the environment; and performing the necessary corrective actions in compliance with guidelines and requirements. This paper summarizes just a few of the successes of the Nevada Operations Office projects.

  10. Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, Washington

    SciTech Connect (OSTI)

    N /A

    2003-04-11T23:59:59.000Z

    This ''Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement'' (HSW EIS) covers three primary aspects of waste management at Hanford--waste treatment, storage, and disposal. It also addresses four kinds of solid waste--low-level waste (LLW), mixed (radioactive and chemically hazardous) low-level waste (MLLW), transuranic (TRU) waste, and immobilized low-activity waste (ILAW). It fundamentally asks the question: how should we manage the waste we have now and will have in the future? This EIS analyzes the impacts of the LLW, MLLW, TRU waste, and ILAW we currently have in storage, will generate, or expect to receive at Hanford. The HSW EIS is intended to help us determine what specific facilities we will continue to use, modify, or construct to treat, store, and dispose of these wastes (Figure S.1). Because radioactive and chemically hazardous waste management is a complex, technical, and difficult subject, we have made every effort to minimize the use of acronyms (making an exception for our four waste types listed above), use more commonly understood words, and provide the ''big picture'' in this summary. An acronym list, glossary of terms, and conversions for units of measure are provided in a readers guide in Volume 1 of this EIS.

  11. Final Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement Richland, Washington

    SciTech Connect (OSTI)

    M.S. Collins C.M. Borgstrom

    2004-01-01T23:59:59.000Z

    The Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (HSW EIS) provides environmental and technical information concerning U.S. Department of Energy (DOE) proposed waste management practices at the Hanford Site. The HSW EIS updates analyses of environmental consequences from previous documents and provides evaluations for activities that may be implemented consistent with the Waste Management Programmatic Environmental Impact Statement (WM PEIS) Records of Decision (RODs). Waste types considered in the HSW EIS include operational low-level radioactive waste (LLW), mixed low-level waste (MLLW), immobilized low-activity waste (ILAW), and transuranic (TRU) waste (including TRU mixed waste). MLLW contains chemically hazardous components in addition to radionuclides. Alternatives for management of these wastes at the Hanford Site, including the alternative of No Action, are analyzed in detail. The LLW, MLLW, and TRU waste alternatives are evaluated for a range of waste volumes, representing quantities of waste that could be managed at the Hanford Site. A single maximum forecast volume is evaluated for ILAW. The No Action Alternative considers continuation of ongoing waste management practices at the Hanford Site and ceasing some operations when the limits of existing capabilities are reached. The No Action Alternative provides for continued storage of some waste types. The other alternatives evaluate expanded waste management practices including treatment and disposal of most wastes. The potential environmental consequences of the alternatives are generally similar. The major differences occur with respect to the consequences of disposal versus continued storage and with respect to the range of waste volumes managed under the alternatives. DOE's preferred alternative is to dispose of LLW, MLLW, and ILAW in a single, modular, lined facility near PUREX on Hanford's Central Plateau; to treat MLLW using a combination of onsite and offsite facilities; and to certify TRU waste onsite using a combination of existing, upgraded, and mobile facilities. DOE issued the Notice of Intent to prepare the HSW EIS on October 27, 1997, and held public meetings during the scoping period that extended through January 30, 1998. In April 2002, DOE issued the initial draft of the EIS. During the public comment period that extended from May through August 2002, DOE received numerous comments from regulators, tribal nations, and other stakeholders. In March 2003, DOE issued a revised draft of the HSW EIS to address those comments, and to incorporate disposal of ILAW and other alternatives that had been under consideration since the first draft was published. Comments on the revised draft were received from April 11 through June 11, 2003. This final EIS responds to comments on the revised draft and includes updated analyses to incorporate information developed since the revised draft was published. DOE will publish the ROD(s) in the ''Federal Register'' no sooner than 30 days after publication of the Environmental Protection Agency's Notice of Availability of the final HSW EIS.

  12. WHB/WTB SPACE PROGRAM ANALYSIS FOR SITE RECOMMENDATION

    SciTech Connect (OSTI)

    W.D. Lindholm

    2000-05-25T23:59:59.000Z

    The purpose of this analysis is to identify and evaluate the functional space and spatial relationship requirements for the two main nuclear buildings, the Waste Handling Building (WHB) and the Waste Treatment Building (WTB), which are part of the Repository Surface Facilities. This analysis is consistent with the Development Plan for ''WHB/WTB Space Program Analysis for Site Recommendation'' (CRWMS M&O 2000r), which concentrates on the primary, primary support, facility support, and miscellaneous building support areas located in the WHB and WTB. The development plan was completed in accordance with AP-2.134, ''Technical Product Development Planning''. The objective and scope of this analysis is to develop a set of spatial parameters (e.g., square footage, room heights, etc.) and layout requirements (e.g., adjacency and access/circulation requirements, etc.) from which preliminary building floor plans are developed and presented as figures. The resulting figures will provide information to support the Site Recommendation and the total system life cycle cost. This analysis uses the Viability Assessment (VA) ''Surface Nuclear Facilities Space Program Analysis'' (SPA) (CRWMS M&O 1997c) as the baseline reference document and further develops the functional requirements based on Project-directed changes, including incorporation of a new design basis waste stream and the applicable elements of Enhanced Design Alternative (EDA)-II, as identified in the ''License Application Design Selection Report'' (CRWMS M&O 1999e), which followed the initial SPA (baseline). The impacts of the EDA-II were almost entirely to the WHB. To meet the EDA-II thermal requirements, hotter fuel would be handled, therefore requiring a fuel-blending pool to be added to the WHB in order to age the hotter he1 at the repository and provide for commercial spent nuclear fuel (CSNF) blending. In addition to EDA-II recommendations, the waste stream was modified, including the elimination of approximately 300 multi-purpose canisters from the CSNF schedule. The bases for the Monitored Geologic Repository (MGR) surface design changes, as a result of the waste stream changes, are defined in ''Calculations from Surface Facilities Operations in Support of the Revision to the Waste Quantity, Mix, and Throughput Study'' (CRWMS M&O 2000c, Section 2.4). This effort resulted in a reduction in the number of canister transfer lines from 2 to 1. In addition, as indicated in ''WITNESS Model Input for Thermal Blending of Commercial Spent Nuclear Fuel Assemblies'' (CRWMS M&O 19991), the quantity of dual-purpose canisters (DPCs) assumed to be shipped to the repository has been reduced by about 37 percent. This change resulted in a reduction of the number of Assembly Transfer System (ATS) lines in the WHB from 3 to 2. In summary, this analysis is intended to provide a preliminary level of design showing room square footages and heights associated with the WHB and WTB. These spatial dimensions are anticipated to increase or decrease as the design progresses.

  13. Stockpile Management Program quarterly report. 2. quarter 1998

    SciTech Connect (OSTI)

    NONE

    1998-11-01T23:59:59.000Z

    The objective of this program is to ensure the safety and reliability of the enduring nuclear weapons stockpile by: (1) maintaining robust nuclear facilities that comprise the infrastructure needed to conduct the various laboratory programs; (2) maintaining capabilities and qualified personnel needed to successfully implement the Program and ensure availability of competencies; (3) meeting present and future production and surveillance requirements to support the enduring stockpile and other programmatic deliverables; and (4) capturing and maintaining expertise and competency in the processes and technologies required to build a complete physics package. Summaries of accomplishments are presented for approximately 30 projects managed under this program.

  14. Savannah River Site Waste Removal Program - Past, Present and Future

    SciTech Connect (OSTI)

    Saldivar, E.

    2002-02-25T23:59:59.000Z

    The Savannah River Site has fifty-one high level waste tanks in various phases of operation and closure. These tanks were originally constructed to receive, store, and treat the high level waste (HLW) created in support of the missions assigned by the Department of Energy (DOE). The Federal Facilities Agreement (FFA) requires the high level waste to be removed from the tanks and stabilized into a final waste form. Additionally, closure of the tanks following waste removal must be completed. The SRS HLW System Plan identifies the interfaces of safe storage, waste removal, and stabilization of the high level waste and the schedule for the closure of each tank. HLW results from the dissolution of irradiated fuel components. Desired nuclear materials are recovered and the byproducts are neutralized with NaOH and sent to the High Level Waste Tank Farms at the SRS. The HLW process waste clarifies in the tanks as the sludge settles, resulting in a layer of dense sludge with salt supernate settling above the sludge. Salt supernate is concentrated via evaporation into saltcake and NaOH liquor. This paper discusses the history of SRS waste removal systems, recent waste removal experiences, and the challenges facing future removal operations to enhance efficiency and cost effectiveness. Specifically, topics will include the evolution and efficiency of systems used in the 1960's which required large volumes of water to current systems of large centrifugal slurry pumps, with significant supporting infrastructure and safety measures. Interactions of this equipment with the waste tank farm operations requirements will also be discussed. The cost and time improvements associated with these present-day systems is a primary focus for the HLW Program.

  15. DOE - Office of Legacy Management -- St Louis Airport Site Vicinity...

    Office of Legacy Management (LM)

    Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: These properties are located in Hazelwood and Berkeley, Missouri,...

  16. Demonstration project in Energy Management programs

    SciTech Connect (OSTI)

    Not Available

    1989-10-01T23:59:59.000Z

    This part of the final report is provided to summarize with more definitive data, the savings realized by the implementation of the Energy Conservation Opportunities (ECOs) identified in the Energy Management Plan (EMP), and for those measures implemented by the Energy Service Company (ESCO).

  17. Sandia National Laboratories California Waste Management Program Annual Report February 2008.

    SciTech Connect (OSTI)

    Brynildson, Mark E.

    2008-02-01T23:59:59.000Z

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  18. Performance Assessment Transport Modeling of Uranium at the Area 5 Radioactive Waste Management Site at the Nevada National Security Site

    SciTech Connect (OSTI)

    NSTec Radioactive Waste

    2010-10-12T23:59:59.000Z

    Following is a brief summary of the assumptions that are pertinent to the radioactive isotope transport in the GoldSim Performance Assessment model of the Area 5 Radioactive Waste Management Site, with special emphasis on the water-phase reactive transport of uranium, which includes depleted uranium products.

  19. EMP Attachment 2 DOE-SC PNNL Site Data Management Plan

    SciTech Connect (OSTI)

    Bisping, Lynn E.

    2011-12-21T23:59:59.000Z

    This Data Management Plan (DMP) describes the data management processes and activities under the Pacific Northwest National Laboratory (PNNL) Site Environmental Monitoring Plan. The activities currently in the Plan are limited to offsite environmental surveillance of PNNL Site radiological releases to the air. The DMP provides guidance on data capture, processing and transmittal, and database configuration management. The requirements for the PNNL Site Environmental Monitoring (SEM) Database and associated records are documented in order to assure that vital data are recorded accurately, stored in a manner that retains data integrity, and are suitable for analyst to use. Protocols and procedures must ensure the data will be adequate and robust.

  20. James A. Turi selected Site Manager for Jefferson Lab | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    fusion energy to environmental management to the deployment of radioisotope thermoelectric generators for the NASA Galileo and Ulysses missions. Turi most recently completed...

  1. Position Title 1. Program Management Consultant

    E-Print Network [OSTI]

    Jayaram, Bhyravabotla

    in good business practices, and establishing baseline and end-of-program surveys to quantify the economic/Agribusiness/Social Science/Policy and Graduation: Science background preferred biology/biotechnology/Chemistry/Agricultural deliverables & outputs, Logical framework approach; Theoretical and practical experience in drafting

  2. Managing an Effective Leak Sealing Program

    E-Print Network [OSTI]

    Rinz, W. H.

    1980-01-01T23:59:59.000Z

    An on-line leak sealing program is an extremely effective method of cost savings to industrial plants. The dollars a plant saves can be direct and dramatic as in an avoided system shut-down or subtle and analytical as in a long term maintenance...

  3. Nutrient Management Educational & Planning Resources The Pennsylvania Nutrient Management Education Program provides a wide array of resources

    E-Print Network [OSTI]

    Guiltinan, Mark

    v.08.2011 Nutrient Management Educational & Planning Resources The Pennsylvania Nutrient Management Education Program provides a wide array of resources to nutrient management specialists. These resources serve two purposes: · Education. These factsheets and publications are selected to supplement

  4. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan

    SciTech Connect (OSTI)

    McCormack, R.L.

    1997-05-07T23:59:59.000Z

    In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O`Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE`s baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported formulation of the initial versions of the Integrated Facilities Plan and the Research and Development Plan. The SISMPs are periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations. This document is the fifth update of the Hanford SISMP.

  5. Environmental Management System 2 2006 Site environmental report2-

    E-Print Network [OSTI]

    was designed to meet the rigorous requirements of the globally recognized International Organization: environmental management SyStem DRAFT gain registration to the ISO 400 and OHSAS 800 standards, an organization for Standardization (ISO) 14001 Environmental Management Standard, with additional emphasis on compliance, pollution

  6. A simulation-based reservoir management program

    SciTech Connect (OSTI)

    Voskanian, M.M. [California State Lands Commission, Sacramento, CA (United States); Kendall, R.P.; Whitney, E.M. [Los Alamos National Lab., NM (United States); Coombs, S. [Pacific Operators Offshore, Inc., Santa Barbara, CA (United States); Paul, R.G. [Minerals Management Service, Reston, VA (United States). Headquarters Office; Ershaghi, I. [Univ. of Southern California, Los Angeles, CA (United States)

    1996-05-01T23:59:59.000Z

    There are more than 5,200 independent oil and gas producers operating in the US today (based on current IPAA membership figures). These companies are playing an increasingly important role in production of hydrocarbons in California and elsewhere in the US. Pacific Operators Offshore, Inc., in a historic collaboration with its government royalty owners, the California State Lands Commission and the Minerals Management Service of the US Department of Interior, is attempting to redevelop the Carpinteria Offshore Field after two-and-a-half decades of production and partial abandonment by a previous operator. This paper will describe a project which focuses on the distribution of advanced reservoir management technologies (geological, petrophysical, and engineering) to independent producers like Pacific Operators Offshore, Inc. The evolving information highway, specifically the World Wide Web (WWW), serves as the distribution medium. The project to be described in this paper is an example of the implementation of a reservoir management tool which is supported by distributed databases, incorporates a shared computing environment, and integrates stochastic, geological, and engineering modeling.

  7. Voluntary Protection Program Onsite Review, Savannah River Site- May 2010

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether the Savannah River Site is continuing to perform at a level deserving DOE-VPP Star recognition.

  8. action program sites: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    profoundly Calvanese, Diego 29 Reconnaissance Soil Geochemistry at the Riverton Uranium Mill Tailings Remedial Action Site, Fremont Environmental Sciences and Ecology Websites...

  9. ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM AT POTENTIAL OTEC SITES

    E-Print Network [OSTI]

    Wilde, P.

    2010-01-01T23:59:59.000Z

    assessment Ocean Thermal Energy Conversion (OTEC) programprojected Ocean Thermal Energy Conversion (OTEC) plants canmonitoring at Ocean Thermal Energy Conversion (OTEC) sites

  10. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    had an obligation to purchase any uranium produced, but had no responsibility for the operation. of the sites or their final condition. The contractors were handling the same...

  11. A Program to Stabilize Nuclear Materials as Managed by the Plutonium Focus Area

    SciTech Connect (OSTI)

    B. Kenley (Kenley Consulting); B. Scott; B. Seidel (ANL-W); D. Knecht (LMITCO); F. Southworth; K. Osborne (DOE-ID); N. Chipman; T. Creque

    1999-03-01T23:59:59.000Z

    This paper describes the program to stabilize nuclear materials, consistent with the Department of Energy Office of Environmental Management (EM) plan, Accelerating Cleanup: Paths to Closure. The program is managed by the Plutonium Stabilization and Disposition Focus Area, which defines and manages technology development programs to stabilize nuclear materials and assure their subsequent safe storage and final disposition. The scope of the Plutonium Stabilization and Disposition Focus Area (PFA) activities includes non-weapons plutonium materials, special isotopes, and other fissile materials. The PFA provides solutions to site-specific and complex wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. Our paper describes an important programmatic function of the Department of Energy nuclear materials stabilization program, including the tie-in of policy to research needs and funding for the nuclear materials disposition area. The PFA uses a rigorous systems engineering determination of technology needs and gaps, under the guidance of a Technical Advisory Panel, consisting of complex-wide experts. The Research and Development planning provides an example for other waste areas and should be of interest to Research and Development managers. The materials disposition maps developed by the PFA and described in this paper provide an evaluation of research needs, data gaps and subsequent guidance for the development of technologies for nuclear materials disposition. This paper also addresses the PFA prioritization methodology and its ability to forecast actual time to implementation.

  12. EIS-0109: Long-Term Management of the Existing Radioactive Wastes and Residues at the Niagara Falls Storage Site

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the environmental impacts of several alternatives for management and control of the radioactive wastes and residues at the Niagara Falls Storage Site, including a no action alternative, an alternative to manage wastes on-site, and two off-site management alternatives.

  13. University of Bristol IT Services document its-t4sm-2 T4 Site Manager for website

    E-Print Network [OSTI]

    Bristol, University of

    University of Bristol IT Services document its-t4sm-2 T4 Site Manager for website moderators, type the document code given in brackets at the top of this page. Related documentation Site Manager Document information Task 1 Overview of the Site Manager Moderator interface

  14. 2002 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    SciTech Connect (OSTI)

    Y. E. Townsend

    2003-06-01T23:59:59.000Z

    Environmental, subsidence, and meteorological monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS)(refer to Figure 1). These monitoring data include radiation exposure, air, groundwater,meteorology, vadose zone, subsidence, and biota data. Although some of these media (radiation exposure, air, and groundwater) are reported in detail in other Bechtel Nevada (BN) reports (Annual Site Environmental Report [ASER], the National Emissions Standard for Hazardous Air Pollutants [NESHAP] report, and the Annual Groundwater Monitoring Report), they are also summarized in this report to provide an overall evaluation of RWMS performance and environmental compliance. Direct radiation monitoring data indicate that exposure at and around the RWMSs is not above background levels. Air monitoring data indicate that tritium concentrations are slightly above background levels. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS has not been affected by the facility. Meteorological data indicate that 2002 was a dry year: rainfall totaled 26 mm (1.0 in) at the Area 3 RWMS and 38 mm (1.5 in) at the Area 5 RWMS. Vadose zone monitoring data indicate that 2002 rainfall infiltrated less than 30 cm (1 ft) before being returned to the atmosphere by evaporation. Soil-gas tritium monitoring data indicate slow subsurface migration, and tritium concentrations in biota were lower than in previous years. Special investigations conducted in 2002 included: a comparison between waste cover water contents measured by neutron probe and coring; and a comparison of four methods for measuring radon concentrations in air. All 2002 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility Performance Assessments (PAs).

  15. Budget FY 1995 site support program plan WBS 6.10.1

    SciTech Connect (OSTI)

    Wemhoff, G.M.

    1994-09-01T23:59:59.000Z

    This is the program plan of Budget for the fiscal year 1995 site support. The topics of the program plan include a general mission statement, the primary customers, major activities performed to deliver products and services, program priorities, goals and objectives, assumptions, issues and constraints, performance measures, work breakdown structure and responsibility assignment matrix, description of activities and milestone list.

  16. The Savannah River Site's Groundwater Monitoring Program - Fourth Quarter 1999 (October through December 1999)

    SciTech Connect (OSTI)

    Hutchison, J.B.

    2000-10-12T23:59:59.000Z

    This report summarizes the Groundwater Monitoring Program conducted by the Savannah River site during fourth quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official records of the analytical results.

  17. The Savannah River Site's Groundwater Monitoring Program - Third Quarter 1999 (July through September 1999)

    SciTech Connect (OSTI)

    Hutchison, J.B.

    2000-09-05T23:59:59.000Z

    This report summarizes the Savannah River Site Groundwater Monitoring Program during the third quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program activities; and serves as an official record of the analytical results.

  18. The Savannah River Site's Groundwater Monitoring Program First Quarter 1999 (January through March 1999)

    SciTech Connect (OSTI)

    Hutchison, J.B.

    1999-12-08T23:59:59.000Z

    This report summarizes the Groundwater Monitoring Program conducted by Savannah River Site during first quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

  19. The Savannah River Site's Groundwater Monitoring Program second quarter 1999 (April through June 1999)

    SciTech Connect (OSTI)

    Hutchison, J.B.

    1999-12-16T23:59:59.000Z

    This report summarizes the Groundwater Monitoring Program conducted by Savannah River Site during first quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

  20. The Savannah River Site's Groundwater Monitoring Program First Quarter 1998 (January through March 1998)

    SciTech Connect (OSTI)

    Hutchison, J.B.

    1999-05-26T23:59:59.000Z

    This report summarizes the Groundwater Monitoring Program conducted by the Savannah River Site during first quarter 1998. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.

  1. Electronic document management system analysis report and system plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Frappaolo, C. [Delphi Consulting Group, Boston, MA (United States)

    1995-09-01T23:59:59.000Z

    Lockheed Martin Energy Systems, Inc. (LMES) has established and maintains Document Management Centers (DMCs) to support Environmental Restoration Program (ER) activities undertaken at three Oak Ridge facilities: Oak Ridge National Laboratory, Oak Ridge K-25 Site, Oak Ridge Y-12 Plant; and two sister sites: Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio, and Paducah Gaseous Diffusion Plant in Paducah, Kentucky. The role of the DMCs is to receive, store, retrieve, and properly dispose of records. In an effort to make the DMCs run more efficiently and to more proactively manage the records` life cycles from cradle to grave, ER has decided to investigate ways in which Electronic Document Management System (EDMS) technologies can be used to redefine the DMCs and their related processes. Specific goals of this study are tightening control over the ER documents, establishing and enforcing record creation and retention procedures, speeding up access to information, and increasing the accessibility of information. A working pilot of the solution is desired within the next six months. Based on a series of interviews conducted with personnel from each of the DMCs, key management, and individuals representing related projects, it is recommended that ER utilize document management, full-text retrieval, and workflow technologies to improve and automate records management for the ER program. A phased approach to solution implementation is suggested starting with the deployment of an automated storage and retrieval system at Portsmouth. This should be followed with a roll out of the system to the other DMCs, the deployment of a workflow-enabled authoring system at Portsmouth, and a subsequent roll out of this authoring system to the other sites.

  2. Nevada National Security Site 2011 Waste Management Monitoring Report, Area 3 and Area 5 Radioactive Waste Management Site

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2012-07-31T23:59:59.000Z

    Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2011 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports. Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are only slightly above detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below derived concentration guides for these radionuclides. During the last 2 weeks of March 2011, gamma spectroscopy results for air particles showed measurable activities of iodine-131 (131I), cesium-134 (134Cs), and cesium-137 (137Cs). These results are attributed to the release of fission products from the damaged Fukushima Daiichi power plant in Japan. The remaining gamma spectroscopy results for air particulates collected at the Area 3 and Area 5 RWMS were below minimum detectable concentrations. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. The 86.3 millimeters (mm) (3.40 inches [in.]) of precipitation at the Area 3 RWMS during 2011 is 44% below the average of 154.1 mm (6.07 in.), and the 64.8 mm (2.55 in.) of precipitation at the Area 5 RWMS during 2011 is 47% below the average of 122.4 mm (4.82 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Automated vadose zone monitoring on Area 5 RWMS operational waste covers was not done during 2011 due to construction of the final evapotranspiration cover at these monitoring locations. Moisture from precipitation did not percolate below 122 centimeters (4 feet) in the vegetated final mono-layer cover on the U-3ax/bl disposal unit at the Area 3 RWMS before being removed by evapotranspiration. During 2011, there was no drainage through 2.4 meters (8 feet) of soil from the Area 3 drainage lysimeters that received only natural precipitation. Ten percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter that received 3 times natural precipitation. All 2011 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

  3. Nevada National Security Site 2013 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Site

    SciTech Connect (OSTI)

    Hudson, D. B.

    2014-08-19T23:59:59.000Z

    Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2013 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2013; 2014a; 2014b). Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are close to detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. The 105.8 millimeters (mm) (4.17 inches [in.]) of precipitation at the Area 3 RWMS during 2013 is 30% below the average of 150.3 mm (5.92 in.), and the 117.5 mm (4.63 in.) of precipitation at the Area 5 RWMS during 2013 is 5% below the average of 123.6 mm (4.86 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Automated vadose zone monitoring on Area 5 and Area 3 RWMS cell covers show no evidence of precipitation percolating through the cover to the waste. Moisture from precipitation did not percolate below 60 centimeters (cm) (2 feet [ft]) in the vegetated final cover on the U-3ax/bl disposal unit at the Area 3 RWMS, and moisture from precipitation and irrigation did not percolate below 45 cm (1.5 ft) on the 92-Acre Area final cover. Irrigation was applied to this cover for seed germination and plant growth. During 2013, there was no drainage through 2.4 meters (8 ft) of soil from the Area 3 drainage lysimeters that received only natural precipitation. Twenty percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter that received 3-times natural precipitation. All 2013 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

  4. Nevada National Security Site 2012 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Site

    SciTech Connect (OSTI)

    Hudson, David B.

    2013-09-10T23:59:59.000Z

    Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2012 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2012; 2013a; 2013b). Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are only slightly above detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. The 133.9 millimeters (mm) (5.27 inches [in.]) of precipitation at the Area 3 RWMS during 2012 is 12% below the average of 153.0 mm (6.02 in.), and the 137.6 mm (5.42 in.) of precipitation at the Area 5 RWMS during 2012 is 11% below the average of 122.4 mm (4.82 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Automated vadose zone monitoring on Area 5 and Area 3 RWMS cell covers show no evidence of precipitation percolating through the cover to the waste. Moisture from precipitation did not percolate below 60 centimeters (cm) (2 feet [ft]) in the vegetated final cover on the U-3ax/bl disposal unit at the Area 3 RWMS, and moisture from precipitation and irrigation did not percolate below 45 cm (1.5 ft) on the 92-Acre Area final cover. Irrigation was applied to this cover for seed germination and plant growth. During 2012, there was no drainage through 2.4 meters (8 ft) of soil from the Area 3 drainage lysimeters that received only natural precipitation. Twenty percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter that received 3 times natural precipitation. All 2012 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

  5. EL Program: Embedded Intelligence in Buildings Program Manager: Steven Bushby, Energy and Environment Division, x5873

    E-Print Network [OSTI]

    Perkins, Richard A.

    be significantly reduced. Congress has established a national goal of achieving net-zero energy buildings by 20301 EL Program: Embedded Intelligence in Buildings Program Manager: Steven Bushby, Energy energy buildings by 2030.1 Approximately 84% of the life cycle energy use of a building is associated

  6. DEMAND SIDE ENERGY MANAGEMENT AND CONSERVATION PROGRAM Measurement and Verification Program

    E-Print Network [OSTI]

    Hofmann, Hans A.

    DEMAND SIDE ENERGY MANAGEMENT AND CONSERVATION PROGRAM Measurement and Verification Program 4 operating hours for the lights in each room a. Assign a usage category to each room in all buildings (e electrical usage and savings in room by room spreadsheet d. Subtotal savings by building

  7. DEMAND SIDE ENERGY MANAGEMENT AND CONSERVATION PROGRAM Measurement and Verification Program

    E-Print Network [OSTI]

    Hofmann, Hans A.

    DEMAND SIDE ENERGY MANAGEMENT AND CONSERVATION PROGRAM Measurement and Verification Program 4 Works Association Research Foundation (AwwaRF) and building demographics for savings calculations 4-retrofit; calculate savings in room by room spreadsheet 5. Pre-retrofit (Process water audit) ­ Walk buildings

  8. Final Report for the MANNRRSS II Program Management of Nevada's Natural Resources with Remote Sensing Systems, Beatty, NV

    SciTech Connect (OSTI)

    Lester Miller; Brian Horowitz; Chris Kratt; Tim Minor; Stephen F. Zitzer; James. V. Taranik; Zan L. Aslett; Todd O. Morken

    2009-06-04T23:59:59.000Z

    This document provides the Final Report on the Management of Nevada’s Natural Resources with Remote Sensing Systems (MANNRRSS) II program. This is a U.S. Department of Energy (DOE)-funded project tasked with utilizing hyperspectral and ancillary electro-optical instrumentation data to create an environmental characterization of an area directly adjacent to the Nevada Test Site (NTS).

  9. U-229: HP Network Node Manager i Input Validation Flaw Permits Cross-Site Scripting Attacks

    Broader source: Energy.gov [DOE]

    Potential security vulnerabilities have been identified with HP Network Node Manager i (NNMi) for HP-UX, Linux, Solaris, and Windows. The vulnerabilities could be remotely exploited resulting in cross site scripting (XSS).

  10. U-204: HP Network Node Manager i Input Validation Hole Permits Cross-Site Scripting Attacks

    Broader source: Energy.gov [DOE]

    Potential security vulnerabilities have been identified with HP Network Node Manager I (NNMi) for HP-UX, Linux, Solaris, and Windows. The vulnerabilities could be remotely exploited resulting in cross site scripting (XSS).

  11. Lawrence Livermore Site Office Manager Joins EM’s Senior Leadership Team

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM Acting Assistant Secretary Dave Huizenga announced today that Alice Williams, manager of the DOE National Nuclear Security Administration (NNSA) Lawrence Livermore Site Office has joined the EM senior leadership team.

  12. Inspection of Environment, Safety, and Health Management at the Hanford Site, March 2002

    Broader source: Energy.gov [DOE]

    The Secretary of Energy’s Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) management at the Department of Energy (DOE) Hanford Site in January-February 2002.

  13. U-212: RSA Authentication Manager Flaws Permit Cross-Site and...

    Office of Environmental Management (EM)

    to be executed by the target user's browser. The code will originate from the site running the RSA Authentication Manager software and will run in the security context of that...

  14. Federal Energy Management Program | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2: FinalOffers New Training on Energy ManagementAugustin2012)4EnergyEnergyFederal

  15. Project Management Plan - Small Producers Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 Hg MercuryProject Final Report:Project ManagementRPSEA

  16. Los Alamos Site Office Nuclear Maintenance Management Program...

    Office of Environmental Management (EM)

    WCRR Monthly Diesel Generator PM, dated 04082011 WI 06.01 Attachment A, JRF-11-06 Preventive Maintenance Cancellation, dated 4122011 WI 06.01 Attachment A, JRF-11-09...

  17. Annual Site Environmental Report Environmental Management Program 3-1

    E-Print Network [OSTI]

    Pennycook, Steve

    that encourage public involvement, are also conducted. 3.1 INTRODUCTION 3.2 COMPREHENSIVE For nearly half, but is a separate project being performed under the aegis of the FFA. WAG 6 CERCLA/RCRA groundwater moni- toring continued under the auspices of the WAG 6 EMP (DOE 1995c). Continued characterization, modeling

  18. Office of Environmental Management's Hanford Site Awards $99M...

    Office of Environmental Management (EM)

    Site Awards 99M Contract to Small Business Small businesses are the backbone of our economy, employing half of all workers in America and creating two out of every three new...

  19. Waste Disposal Site and Radioactive Waste Management (Iowa)

    Broader source: Energy.gov [DOE]

    This section describes the considerations of the Commission in determining whether to approve the establishment and operation of a disposal site for nuclear waste. If a permit is issued, the...

  20. Sustainable NREL - Site Sustainability Plan FY 2015 (Management Publication)

    SciTech Connect (OSTI)

    Not Available

    2015-01-01T23:59:59.000Z

    NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

  1. Hanford Site Waste Management Area C Performance Assessment ...

    Office of Environmental Management (EM)

    Exchange December 11-12, 2014 To view all the P&RA CoP 2014 Technical Exchange Meeting videos click here. Video Presentation - Part 1 Video Presentation - Part 2 Hanford Site Waste...

  2. Site design for urban water management in Mexico City

    E-Print Network [OSTI]

    Rivera, José Pablo (Rivera De la Mora), 1967-

    2001-01-01T23:59:59.000Z

    As the world becomes aware of the scarcity of water resources and cities struggle to meet a growing demand, we face the challenge of finding more efficient ways to manage this vital resource. Cities in developing countries ...

  3. 2013 Program Management Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of BadTHEEnergy Vehicle Analysis3 FacilityA.GTO 2013 Peer3 Program

  4. Federal Energy Management Program Organization Chart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721Energy 3_adv_battery.pdf More Fact14, 2002:EnergyPortalProgram Last

  5. Weight Management Program - HPMC Occupational Health Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron SpinPrincetonUsing Maps1DOETHEWeekly Reports 2014 WeeklyProgram Health

  6. This program is designed to loan bicycles to employees that are staying on-site and have no vehicle for transportation.

    E-Print Network [OSTI]

    Ohta, Shigemi

    of the use of this bicycle, including any claim for personal injury or property damage. I further agree off-the-shelf from Property & Procurement Management conform to this standard. Only staff who rideThis program is designed to loan bicycles to employees that are staying on-site and have no vehicle

  7. Sandia National Laboratories, California Waste Management Program annual report : February 2009.

    SciTech Connect (OSTI)

    Brynildson, Mark E.

    2009-02-01T23:59:59.000Z

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System rogram Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  8. Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis - FINAL REPORT

    SciTech Connect (OSTI)

    Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.; Thom, Ronald M.; Kaufmann, Ronald M.; Zimmerman, Shon A.; Sagar, Jina; Buenau, Kate E.; Corbett, C.

    2012-05-31T23:59:59.000Z

    The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions of the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.

  9. Demonstration project in Energy Management Programs

    SciTech Connect (OSTI)

    Not Available

    1989-05-01T23:59:59.000Z

    The Energy Management Plan of the campuses developed under this project showed that there were a number of low-cost Energy Conservation Opportunities (ECO's) with a payback of under one year, (Short term Opportunities, STO). There were also other ECO's identified that had paybacks of more than one year. By combining these ECO's into one contract with the ESCO and paying for the costs of the ECO's by the savings resulting in the reduced energy bills, the University enhanced it's ability to carry out its mission of providing higher educational opportunities without spending money on non-educational activities. The low cost projects subsidize'' or provide leverage for the capital intensive, longer payback projects, to make an overall package that lends itself to innovative financing. JC Smith's contract also guarantees that the annual energy levels will not be increased.

  10. Acquisition Career Management Program (Informational Purposes Only)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-11-21T23:59:59.000Z

    This draft has been scheduled for final review before the Directives Review Board on 4-2-15 (delayed from 12-4-14 session). All major comments and concerns should be provided to your DRB representative, following your organization process. If you do not know who your representative is, please see the list of DRB members at https://www.directives.doe.gov/beta/references/directives-review-board. If your office is represented by Ingrid Kolb, Director, Office of Management, please submit your major concerns and comments to the DRB Liaison, Camille Beben (Camille.Beben@hq.doe.gov; 202-586-4014). All major comments and concerns should be submitted by COB 3-31-15.

  11. Report on the Oregon Ballast Water Management Program in 2004

    E-Print Network [OSTI]

    Ballast Water Management Program in 2004 Produced for the Oregon State Legislature By The Oregon Ballast regulations; shipping industry's compliance with Oregon law; and ballast water treatment technology as inefficient and having some safety constraints, ballast water exchange is still the primary treatment method

  12. AT&TConsulting Incident Management Program Security Services

    E-Print Network [OSTI]

    Fisher, Kathleen

    and best practices. The AT&T Incident Management Program service provides expert resources to assess overhaul. AT&T Consulting will create custom solutions that are practical, efficient and help address response to a proactive, preventative approach. Although new technology solutions, such as Intrusion

  13. Emergency Management Fundamentals and the Operational Emergency Base Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-07-11T23:59:59.000Z

    The Guide provides information about the emergency management fundamentals imbedded in the requirements of DOE O 151.1C, as well as acceptable methods of meeting the requirements for the Operational Emergency Base Program, which ensures that all DOE facilities have effective capabilities for all emergency response. Cancels DOE G 151.1-1, Volume 1.

  14. EA-0915: Waste Tank Safety Program Hanford Site, Richland, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to resolve waste tank safety issues at the Hanford Site near the City of Richland, Washington, and to reduce the risks associated with...

  15. Cost and Performance Report Accelerated Site Technology Deployment Program

    SciTech Connect (OSTI)

    P. S. Morris

    2002-05-01T23:59:59.000Z

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Restoration Division (ERD) Industrial Sites Project Deactivation and Decommissioning (D and D) source group has limited budget and is constantly searching for new technologies to reduce programmatic costs. Partnering with the DOE Office of Science and Technology Deactivation and Decommissioning Focus Area (DDFA) reduces NNSA/NV programmatic risk and encourages accelerated deployment of potentially beneficial technologies to the Nevada Test Site (NTS).

  16. Assessment of Managed Aquifer Recharge Site Suitability Using a GIS and Modeling

    E-Print Network [OSTI]

    Fisher, Andrew

    with a regional groundwater model to assess the hydrologic impact of potential MAR placement and operating planning, including evaluation of options for enhancing groundwater resources. Introduction ManagedAssessment of Managed Aquifer Recharge Site Suitability Using a GIS and Modeling by Tess A. Russo1

  17. Hanford site solid waste management environmental impact statement technical information document [SEC 1 THRU 4

    SciTech Connect (OSTI)

    FRITZ, L.L.

    2003-04-01T23:59:59.000Z

    This Technical Information Document (TID) provides engineering data to support DOE/EIS-0286, ''Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement,'' including assumptions and waste volumes calculation data.

  18. Review of the Hanford Site Employee Concerns Programs, July 2012

    Office of Environmental Management (EM)

    faster to complete a milestone at the expense of safety so that management could get a bonus. During the investigation, the term "bonus" was interpreted as a monetary reward to...

  19. Weed Management Costs, Weed Best Management Practices, and The Roundup Ready Weed Management Program

    E-Print Network [OSTI]

    Mitchell, Paul D.

    substantially increase weed management costs and so discourage adoption. This paper uses survey results: glyphosate, resistance management, BMP adoption, telephone survey, herbicide #12;2 INTRODUCTION Roundup ReadyWeed Management Costs, Weed Best Management Practices, and The Roundup Ready® Weed Management

  20. Sandia National Laboratories, California Hazardous Materials Management Program annual report : February 2009.

    SciTech Connect (OSTI)

    Brynildson, Mark E.

    2009-02-01T23:59:59.000Z

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Hazardous Materials Management Program. It functions as supporting documentation to the SNL/CA Environmental anagement ystem Program Manual. This program annual report describes the activities undertaken during the past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.