Powered by Deep Web Technologies
Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Forecast error metrics for Navy inventory management performance .  

E-Print Network (OSTI)

??This research establishes metrics for determining overall Navy secondary inventory forecasting accuracy when compared to actual demands at the Naval Inventory Control Point (NAVICP). Specifically,… (more)

Jackson, Kenneth J.

2011-01-01T23:59:59.000Z

2

Performance metrics and life-cycle information management for building performance assurance  

SciTech Connect

Commercial buildings account for over $85 billion per year in energy costs, which is far more energy than technically necessary. One of the primary reasons buildings do not perform as well as intended is that critical information is lost, through ineffective documentation and communication, leading to building systems that are often improperly installed and operated. A life-cycle perspective on the management of building information provides a framework for improving commercial building energy performance. This paper describes a project to develop strategies and techniques to provide decision-makers with information needed to assure the desired building performance across the complete life cycle of a building project. A key element in this effort is the development of explicit performance metrics that quantitatively represent performance objectives of interest to various building stakeholders. The paper begins with a discussion of key problems identified in current building industry practice, and ongoing work to address these problems. The paper then focuses on the concept of performance metrics and their use in improving building performance during design, commissioning, and on-going operations. The design of a Building Life-cycle Information System (BLISS) is presented. BLISS is intended to provide an information infrastructure capable of integrating a variety of building information technologies that support performance assurance. The use of performance metrics in case study building projects is explored to illustrate current best practice. The application of integrated information technology for improving current practice is discussed.

Hitchcock, R.J.; Piette, M.A.; Selkowitz, S.E.

1998-06-01T23:59:59.000Z

3

ARM - 2008 Performance Metrics  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Performance Metrics 8 Performance Metrics Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) ARM Science Team Meetings User Meetings Annual Meetings of the Atmospheric System Research (ASR) Science Team and Fall Working Groups Accomplishments Read about the 20 years of accomplishments (PDF, 696KB) from the ARM Program and user facility. Performance Metrics ASR Metrics 2009 2008 2007 2006 2008 Performance Metrics Each year, the ARM Program must submit to DOE an overall performance measure related to scientific achievement. The overall performance measure includes specific metrics for reporting progress each quarter. This reporting process includes support documentation (usually a report or data file) appropriate for the metric. Overall Performance Measures

4

ARM - 2009 Performance Metrics  

NLE Websites -- All DOE Office Websites (Extended Search)

9 Performance Metrics 9 Performance Metrics Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) ARM Science Team Meetings User Meetings Annual Meetings of the Atmospheric System Research (ASR) Science Team and Fall Working Groups Accomplishments Read about the 20 years of accomplishments (PDF, 696KB) from the ARM Program and user facility. Performance Metrics ASR Metrics 2009 2008 2007 2006 2009 Performance Metrics Improve Climate Models - Develop a coupled climate model with fully interactive carbon and sulfur cycles, as well as dynamic vegetation to enable simulations of aerosol effects, carbon chemistry, and carbon sequestration by the land surface and oceans and the interactions between the carbon cycle and climate. In fiscal year 2009: Provide improved climate

5

ARM - 2007 Performance Metrics  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Performance Metrics 7 Performance Metrics Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) ARM Science Team Meetings User Meetings Annual Meetings of the Atmospheric System Research (ASR) Science Team and Fall Working Groups Accomplishments Read about the 20 years of accomplishments (PDF, 696KB) from the ARM Program and user facility. Performance Metrics ASR Metrics 2009 2008 2007 2006 2007 Performance Metrics A Single Column Model (SCM) represents the evolution of the atmosphere in a single grid box of a Global Climate Model (GCM). This illustration represents the observing strategy of ARM, which takes continuous atmospheric observations from fixed sites in three climate regimes around the world. A Single Column Model (SCM) represents the evolution of the atmosphere in a

6

Buildings Performance Metrics Terminology  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy's Commercial Building Initiative Page 1 Energy's Commercial Building Initiative Page 1 January 2009 Buildings Performance Metrics Terminology To clarify how the terms are used in the Department of Energy's Performance Metrics Research Project, a list of terms related to performance metrics are defined and include examples and comments. Visit www.commercialbuildings.energy.gov/performance_metrics.html to learn more. Baseline - a standard reference case used as a basis for comparison Examples: a simulation model of an ASHRAE 90.1 compliant building, control building, measurement of energy consumption prior to application of an energy conservation measure Comments: Establishing a clearly defined baseline very important and is often the most difficult task. Defining a repeatable baseline is essential if the work is to be compared to results of other

7

Performance Metrics Tiers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Performance Metrics Tiers Performance Metrics Tiers Performance Metrics Tiers The performance metrics defined by the Commercial Buildings Integration Program offer different tiers of information to address the needs of various users. On this page you will find information about the various goals users are trying to achieve by using performance metrics and the tiers of metrics. Goals in Measuring Performance Many individuals and groups are involved with a building over its lifetime, and all have different interests in and requirements for the building. Although these interests differ, the value in using metrics reflects a small number of driving factors: Controlling energy costs and energy consumption Minimizing environmental impacts Enhancing the image through marketing Improving load forecasting, energy management, and reliability.

8

Performance Metrics for Commercial Buildings  

SciTech Connect

Commercial building owners and operators have requested a standard set of key performance metrics to provide a systematic way to evaluate the performance of their buildings. The performance metrics included in this document provide standard metrics for the energy, water, operations and maintenance, indoor environmental quality, purchasing, waste and recycling and transportation impact of their building. The metrics can be used for comparative performance analysis between existing buildings and industry standards to clarify the impact of sustainably designed and operated buildings.

Fowler, Kimberly M.; Wang, Na; Romero, Rachel L.; Deru, Michael P.

2010-09-30T23:59:59.000Z

9

Performance Metrics for Proteomics  

Science Conference Proceedings (OSTI)

... for Cancer (CPTC), NIST researchers are developing specific and quantitative metrics, implemented in a software pipeline, for evaluating sources ...

2013-07-10T23:59:59.000Z

10

Enterprise performance measurement system : metric design framework and tools  

E-Print Network (OSTI)

Existing metric selection methodologies and performance measurement frameworks provide practicing managers with good checklists and tools to evaluate and design their enterprise performance measurement systems (EPMS) and ...

Teo, Kai Siang

2013-01-01T23:59:59.000Z

11

Building Technologies Office: Performance Metrics Tiers  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance Metrics Performance Metrics Tiers to someone by E-mail Share Building Technologies Office: Performance Metrics Tiers on Facebook Tweet about Building Technologies Office: Performance Metrics Tiers on Twitter Bookmark Building Technologies Office: Performance Metrics Tiers on Google Bookmark Building Technologies Office: Performance Metrics Tiers on Delicious Rank Building Technologies Office: Performance Metrics Tiers on Digg Find More places to share Building Technologies Office: Performance Metrics Tiers on AddThis.com... About Take Action to Save Energy Activities 179d Tax Calculator Advanced Energy Design Guides Advanced Energy Retrofit Guides Building Energy Data Exchange Specification Buildings Performance Database Data Centers Energy Asset Score Energy Modeling Software

12

Buildings Performance Metrics Terminology | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Terminology Buildings Performance Metrics Terminology This document provides the terms and definitions used in the Department of Energys Performance Metrics Research...

13

The NERSC Sustained System Performance (SSP) Metric  

E-Print Network (OSTI)

Effective System Performance (ESP) Metric High performancerefers to this metric as the ESP (Effective Peak TFlop/sSystem Performance) 4 . ESP 5 has several characteristics

Kramer, William; Shalf, John; Strohmaier, Erich

2005-01-01T23:59:59.000Z

14

The NERSC Sustained System Performance (SSP) Metric  

E-Print Network (OSTI)

The NERSC Sustained System Performance (SSP) Metric WilliamSSP) metric developed by NERSC for its procurements. Theis important. One system at NERSC consistently slowed down

Kramer, William; Shalf, John; Strohmaier, Erich

2005-01-01T23:59:59.000Z

15

Performance Metrics and Budget Division (HC-51) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Performance Metrics and Budget Division (HC-51) Performance Metrics and Budget Division (HC-51) Performance Metrics and Budget Division (HC-51) MISSION: The mission of the Performance Metrics and Budget Division (HC-51) is to support the effective and efficient implementation of the Department of Energy's human capital initiatives and functions through the strategic integration of corporate human capital performance metrics and the budget of the Office of the Chief Human Capital Officer (HC). FUNCTIONS: Human capital performance measurement and strategic functions at the DOE and interagency levels include: Provides analytical support and strategic advice to internal and external HC stakeholders on the appropriate and effective use of performance metrics as a key to effective strategic human capital management.

16

Performance Metrics Research Project - Final Report  

SciTech Connect

NREL began work for DOE on this project to standardize the measurement and characterization of building energy performance. NREL's primary research objectives were to determine which performance metrics have greatest value for determining energy performance and to develop standard definitions and methods of measuring and reporting that performance.

Deru, M.; Torcellini, P.

2005-10-01T23:59:59.000Z

17

APC: a performance metric of memory systems  

Science Conference Proceedings (OSTI)

Due to the infamous "memory wall" problem and a drastic increase in the number of data intensive applications, memory rather than processor has become the leading performance bottleneck of modern computing systems. Evaluating and understanding memory ... Keywords: measurement methodology, memory metric, memory performance measurement

Xian-He Sun; Dawei Wang

2012-10-01T23:59:59.000Z

18

Integrating Process Unit Energy Metrics into Plant Energy Management Systems  

E-Print Network (OSTI)

As energy costs continue to rise across the process industry, many plants have responded by developing improved energy monitoring and reporting programs. At the center of such programs are typically spreadsheet or database applications that pull information, such as fired heater excess oxygen and steam vent rates, from the plant data historian and generate summary reports that compare and trend actual performance relative to targets. On average, plants can expect to reduce overall energy costs by up to 10% through improved management of plant variables, or metrics, that influence energy consumption. Energy metrics can generally be classified into three categories: Equipment, Utility System, and Process. Examples of each type of metric will be given in the paper. As a percentage of the overall savings sited above, the energy savings through stewardship and optimization of Equipment, Utility System and Process metrics are generally 50%, 40% and 10%, respectively. Plants have generally done a good job of stewarding the 90% of savings available through Utility and Equipment related energy metrics, primarily because target setting is fairly straightforward. However, the 10% of savings available from Process metrics, such as tower reflux ratios, pumparound rates, and steam stripping ratios, are typically missing from energy management systems due to the difficulty in first identifying them, and second in determining the optimum targets. Target setting is most difficult because with process metrics, yield considerations must be included in the target setting process. It is quite easy, for example, to save energy by cutting tower reflux rates. But too much reduction will sacrifice yield performance. Even at elevated energy prices, even the smallest reduction in yield will typically offset any energy savings that might have been captured. Therefore, in order to effectively incorporate Process energy metrics into the plant energy management system, knowledge of both energy and yield parameters is required. This paper will explore an effective methodology for determining what process unit energy metrics are important, how to effectively set their targets, and how to incorporate them into an effective energy management system. In terms of how to identify process energy metrics, the paper will discuss which energy intensive processes should be examined first, such as crude distillation and cat cracking. In terms of target setting, the paper will describe how process engineering experience is combined with simulation to develop meaningful targets that characterize the point where yield and energy are simultaneously optimized. Finally, the work process required

Davis, J. L.; Knight, N.

2005-01-01T23:59:59.000Z

19

2012 Proceedings of the Performance Metrics for Intelligent ...  

Science Conference Proceedings (OSTI)

Page 1. NIST Special Publication 1136 2012 Proceedings of the Performance Metrics for Intelligent Systems (PerMI '12) Workshop ...

2012-11-19T23:59:59.000Z

20

Performance Management  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Performance Management. ... If you are unable to access these PDF files, please contact the Office of Workforce Management.

2013-04-20T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Performance Metrics for Soil Moisture Retrievals and Application Requirements  

Science Conference Proceedings (OSTI)

Quadratic performance metrics such as root-mean-square error (RMSE) and time series correlation are often used to assess the accuracy of geophysical retrievals (satellite measurements) with respect to true fields. These metrics are related; ...

Dara Entekhabi; Rolf H. Reichle; Randal D. Koster; Wade T. Crow

2010-06-01T23:59:59.000Z

22

EM Corporate Performance Metrics, Complex Level  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Complex Level Complex Level July, 2013 Performance Measure Unit Lifecycle Total Estimate Pre-2013 Lifecycle Values 2013 Target 2014 Target Pu packaged for long-term disposition Number of Containers 5,089 5,089 5,089 5,089 eU packaged for disposition Number of Containers 8,198 8,016 8,016 8,016 Pu/U residues packaged for disposition Kilograms of Bulk 107,828 107,828 107,828 107,828 DU & U packaged for disposition Metric Tons 736,801 32,452 45,317 76,817 Liquid Waste eliminated Thousands of Gallons 91,907 5,340 6,260 6,812 Liquid Waste Tanks closed Number of Tanks 239 11 11 13 HLW packaged for disposition Number of Containers 24,183 3,802 4,077 4,283 SNF packaged for disposition Metric Tons of Heavy Metal 2,450 2,128 2,128 2,128

23

Grid Performance Metrics Using Model-less Algorithms Pete Sauer...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Grid Performance Metrics Using Model-less Algorithms Pete Sauer and Alejandro D. Domnguez-Garca Department of Electrical and Computer Engineering University of Illinois at...

24

Full list of Portfolio Manager custom reporting metrics | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Full list of Portfolio Manager custom reporting metrics Full list of Portfolio Manager custom reporting metrics Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources

25

Software Metrics Knowledge and Databases for Project Management  

Science Conference Proceedings (OSTI)

Abstract¿Construction and maintenance of large, high-quality software projects is a complex, error-prone, and difficult process. Tools employing software database metrics can play an important role in efficient execution and management of such large ... Keywords: Knowledge-based tools for software project management, efficiency and robustness in large-scale software development, knowledge abstraction from raw data, software metrics databases, test and evaluation, cost-effective project management.

Raymond A. Paul; Tosiyasu L. Kunii; Yoshihisa Shinagawa; Muhammad F. Khan

1999-01-01T23:59:59.000Z

26

Transmission System Reliability Performance Metrics Requirements  

Science Conference Proceedings (OSTI)

Transmission availability has become the significant indicator of overall transmission system operational health, due to increased utilization of the transmission system, growth of deregulated energy wholesale markets, and decreased investment in new transmission assets. Availability trends reflect the increasing dependence upon transmission assets from a technical and market perspective. Presently availability metrics lack comparability due to the non-standardization of underlying data collection method...

2003-12-12T23:59:59.000Z

27

Performance metrics for soil moisture retrievals and application requirements  

E-Print Network (OSTI)

Quadratic performance metrics such as root-mean-square error (RMSE) and time series correlation are often used to assess the accuracy of geophysical retrievals (satellite measurements) with respect to true fields. These ...

Entekhabi, Dara

28

NIST Performance Management Program  

Science Conference Proceedings (OSTI)

NIST Performance Management Program. Performance ... appraisal. APMS and FWS Performance Management Programs: ...

2010-10-05T23:59:59.000Z

29

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2008 Target FY 2008 Actual...

30

Program Performance Metrics rogram evaluation is not  

E-Print Network (OSTI)

Johnson's "Planning, Programming & Budgeting System" is still used by the Pentagon; Nixon's "Management by Objective" identified goals and results and eliminated redundancies; Carter's "Zero-Based Budgeting" forced.S. Department of Energy under Contract number DE-AC05-00OR22725 Center for Transportation Analysis Research

31

Performance Metrics for Embedded Parallel Pipelines  

Science Conference Proceedings (OSTI)

Abstract¿A statistical approach to performance prediction is applied to a system development methodology for pipelines comprised of independent parallel stages. The methodology is aimed at distributed memory machines employing medium-grained parallelization. ... Keywords: Performance prediction, parallel pipelines, real-time systems, order statistics.

Martin Fleury; Andrew C. Downton; Adrian F. Clark

2000-11-01T23:59:59.000Z

32

Metrics based performance control over text mining tools in bioinformatics  

Science Conference Proceedings (OSTI)

Bioinformatics is a field of biology merging with few other sciences like information technology and statistics which involves in the discovery of new tools for data analysis and interpretation of accurate result. Some of the areas in which bioinformatics ... Keywords: bioinformatics, performance control, performance evaluation, software metrics, text mining

Jayanthi Manicassamy; P. Dhavachelvan

2009-01-01T23:59:59.000Z

33

The NERSC Sustained System Performance (SSP) Metric  

Science Conference Proceedings (OSTI)

Most plans and reports recently discuss only one of four distinct purposes benchmarks are used. The obvious purpose is selection of a system from among its competitors, something that is the main focus of this paper. This purpose is well discussed in many workshops and reports. The second use of benchmarks is validating the selected system actually works the way expected once it arrives. This purpose may be more important than the first reason. The second purpose is particularly key when systems are specified and selected based on performance projections rather than actual runs on the actual hardware. The third use of benchmarks, seldom mentioned, is to assure the system performs as expected throughout its lifetime1, (e.g. after upgrades, changes, and regular use.) Finally, benchmarks are used to guide system designs, something covered in detail in a companion paper from Berkeley's Institute for Performance Studies (BIPS).

Kramer, William; Shalf, John; Strohmaier, Erich

2005-09-18T23:59:59.000Z

34

Using metrics in management decision making  

Science Conference Proceedings (OSTI)

The amount of code in NASA systems has continued to grow over the past 30 years. This growth brings with it the increased risk of system failure caused by software. Thus, managing the risks inherent in software development and maintenance is becoming ...

George Stark; Robert C. Durst; C. W. Vowell

1994-09-01T23:59:59.000Z

35

EM Corporate Performance Metrics, Site Level  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Level Site Level July, 2013 Site Performance Measure Unit Lifecycle Total Estimate Pre-2013 Lifecycle Values 2013 Target 2014 Target Ames Laboratory Geographic Sites Eliminated Number completed 1 1 1 1 Argonne National Laboratory-East TRU-RH Cubic Meters 22 22 22 22 Argonne National Laboratory-East TRU-CH Cubic Meters 21.4 21.4 21 21 Argonne National Laboratory-East Radioactive Facility Completions Number of Facilities 80 80 80 80 Argonne National Laboratory-East Geographic Sites Eliminated Number completed 1 1 1 1 Argonne National Laboratory-East Remediation Complete Number of Release Sites 443 443 443 443 Brookhaven National Laboratory eU packaged for disposition Number of Containers 0 0 0 0 Brookhaven National Laboratory Nuclear Facility Completions Number of Facilities 2 2 2 2

36

Toward a new metric for ranking high performance computing systems.  

SciTech Connect

The High Performance Linpack (HPL), or Top 500, benchmark [1] is the most widely recognized and discussed metric for ranking high performance computing systems. However, HPL is increasingly unreliable as a true measure of system performance for a growing collection of important science and engineering applications. In this paper we describe a new high performance conjugate gradient (HPCG) benchmark. HPCG is composed of computations and data access patterns more commonly found in applications. Using HPCG we strive for a better correlation to real scientific application performance and expect to drive computer system design and implementation in directions that will better impact performance improvement.

Heroux, Michael Allen; Dongarra, Jack. [University of Tennessee, Knoxville, TN

2013-06-01T23:59:59.000Z

37

Meaningful Energy Efficiency Performance Metrics for the Process Industries  

E-Print Network (OSTI)

An effective energy performance benchmarking should include a consideration of production rate, product specifications, feedstock mix, and process type, in addition to thermodynamics and economics. Unfortunately, there is no accepted industry standard for developing Energy Efficiency (EE) performance metrics for the chemical process industries, and published literature on the subject is extremely sparse. This paper will present a comprehensive system of EPIs as applied in a complex multi-product multi-plant organization in the oil and gas industry. Four categories of EPIs are recommended: • By equipment • By process unit • By product • By business unit. It will be shown how each type of EPI fulfills a specific business objective in the organization. Successes and failures are described, and recommendations are provided. The principles and practices outlined in this paper are generally applicable, and will hopefully lead to a standard methodology for EE performance reporting.

Kumana, J. D.; Sidhwa, N. R.

2009-05-01T23:59:59.000Z

38

Performance measures framework for unmanned systems (PerMFUS): models for contextual metrics  

Science Conference Proceedings (OSTI)

In the development of the Performance Measures Framework for Unmanned Systems (PerMFUS), we have established a multiple-axis performance metrics model for the unmanned systems (UMS). This model characterizes the UMS performance requirements by the missions ... Keywords: ALFUS, HSI, UMS, autonomy, collaboration, communication, contextual autonomy, contextual metrics, energy, environment, goal, human-system interaction, measure, metrics, mission, mobility, perception, performance, power, robot, sensing, task, terminology, test, unmanned system

Hui-Min Huang; Elena Messina; Adam Jacoff; Robert Wade; Michael McNair

2010-09-01T23:59:59.000Z

39

Office of HC Strategy Budget and Performance Metrics (HC-50) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategy Budget and Strategy Budget and Performance Metrics (HC-50) Office of HC Strategy Budget and Performance Metrics (HC-50) Mission Statement and Function Statement The Office of Human Capital Strategy, Budget, and Performance Metrics provides strategic direction and advice to its stakeholders through the integration of budget analysis, workforce projections, and performance metrics in support of the goals and missions of the Department of Energy. Functions: Promotes business partnerships with Departmental elements to define and design HCM implementation strategies in alignment with Departmental mission, goals, and objectives. Provides strategic direction and advice through analysis of budget, workforce projections, and performance to respond to congressional mandates, administration goals, Departmental priorities and mission needs.

40

Building Cost and Performance Metrics: Data Collection Protocol, Revision 1.0  

SciTech Connect

This technical report describes the process for selecting and applying the building cost and performance metrics for measuring sustainably designed buildings in comparison to traditionally designed buildings.

Fowler, Kimberly M.; Solana, Amy E.; Spees, Kathleen L.

2005-09-29T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011...

42

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

43

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY...

44

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY...

45

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Final FY...

46

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

47

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 st Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

48

Impact of Different Economic Performance Metrics on the Perceived...  

NLE Websites -- All DOE Office Websites (Extended Search)

low IRRs up to the reinvestment rate and high IRRs down to the reinvestment rate (McKinsey & Co. 2004). The IRR and MIRR metrics are likely to be used to evaluate commercial...

49

A building life-cycle information system for tracking building performance metrics  

SciTech Connect

Buildings often do not perform as well in practice as expected during pre-design planning, nor as intended at the design stage. While this statement is generally considered to be true, it is difficult to quantify the impacts and long-term economic implications of a building in which performance does not meet expectations. This leads to a building process that is devoid of quantitative feedback that could be used to detect and correct problems both in an individual building and in the building process itself. One key element in this situation is the lack of a standardized method for documenting and communicating information about the intended performance of a building. This paper describes the Building Life-cycle Information System (BLISS); designed to manage a wide range of building related information across the life cycle of a building project. BLISS is based on the Industry Foundation Classes (IFC) developed by the International Alliance for Interoperability. A BLISS extension to th e IFC that adds classes for building performance metrics is described. Metracker, a prototype tool for tracking performance metrics across the building life cycle, is presented.

Hitchcock, R.J.; Piette, M.A.; Selkowitz, S.E.

1999-04-01T23:59:59.000Z

50

Review of performance metrics for green data centers: a taxonomy study  

Science Conference Proceedings (OSTI)

Data centers now play an important role in modern IT infrastructures. Although much research effort has been made in the field of green data center computing, performance metrics for green data centers have been left ignored. This paper is devoted to ... Keywords: Data center, Green computing, Performance metrics

Lizhe Wang; Samee U. Khan

2013-03-01T23:59:59.000Z

51

Performance Management Methodology Moving from Performance Measurement to Performance Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guide to a Balanced Scorecard: Guide to a Balanced Scorecard: Performance Management Methodology Moving from Performance Measurement to Performance Management Guide to a Balanced Scorecard Performance Management Methodology Richard H. Hopf Deputy Assistant Secretary for Procurement and Assistance Management Department of Energy Lloyd W. Pratsch Procurement Executive Department of State Robert A. Welch Director for Acquisition Management and Procurement Executive Department of Commerce Pauk A. Denett Director of Administration/Senior Procurement Executive Department of Interior David J. Litman Director, Office of Acquisition and Grants Management Department of Transportation Ida M. Ustad Deputy Associate Administrator for Acquisition Policy General Services Administration Terrence J. Tychan Deputy Assistant Secretary for Grants

52

Grid Reliability Performance Metrics Using Phasor Data and Model-less Algorithms,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability Performance Metrics Using Reliability Performance Metrics Using Phasor Data and Model-less Algorithms, Prototype Development and Field Test Carlos Martinez - Advanced Systems Researchers (ASR) cmartinez@asresearchers.com June 27-28 2013 Washington, DC DOE/OE Transmission Reliability Program 2 Project Objective LOAD-GENERATION CONTROL RELIABILITY PERFORMANCE REALTIME MONITORING GRID RELIABILITY PERFORMANCE PHASOR BASED AND MODELESS REALTIME MONITORING RESEARCH, PROTOTYPE AND FIELD TEST ALL APPLICATIONS IN PRODUCTION PROJECT OBJECTIVES 3 Project Analytics Approach 4 Accomplishments to be Completed in FY 2013 * Deliver to MISO the Extended Prototype Functional Specification * Complete Research, Test and Validation of Grid Post- Disturbance Reliability Metrics

53

Impact of Different Economic Performance Metrics on the Perceived Value of Solar Photovoltaics  

DOE Green Energy (OSTI)

Photovoltaic (PV) systems are installed by several types of market participants, ranging from residential customers to large-scale project developers and utilities. Each type of market participant frequently uses a different economic performance metric to characterize PV value because they are looking for different types of returns from a PV investment. This report finds that different economic performance metrics frequently show different price thresholds for when a PV investment becomes profitable or attractive. Several project parameters, such as financing terms, can have a significant impact on some metrics [e.g., internal rate of return (IRR), net present value (NPV), and benefit-to-cost (B/C) ratio] while having a minimal impact on other metrics (e.g., simple payback time). As such, the choice of economic performance metric by different customer types can significantly shape each customer's perception of PV investment value and ultimately their adoption decision.

Drury, E.; Denholm, P.; Margolis, R.

2011-10-01T23:59:59.000Z

54

Performance Management Plan  

SciTech Connect

This Performance Management Plan describes the approach for accelerating cleanup activities of U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Management (EM) Program. This approach accelerates the reduction of risk at NNSA/NV sites while performing the work responsibly, effectively, and more efficiently. In May 2002, NNSA/NV EM and the Nevada Division of Environmental Protection signed a Letter of Intent formalizing an agreement to pursue accelerated risk reduction and cleanup for activities within the State of Nevada. This Performance Management Plan provides the strategic direction for implementing the Letter of Intent.

IT Corporation, Las Vegas, NV

2002-08-21T23:59:59.000Z

55

Metric Selection for Ecosystem Restoration  

E-Print Network (OSTI)

managers identify the best metrics to evaluate and select the recommended restoration plan, monitor and assess progress toward achieving project objectives, and, if necessary, inform adaptive management decisions. Performance metrics, or measurable system components used to estimate and track the state of critical aspects of the project, are often the basis for project decision making and furthering scientific understanding. As such, ecosystem restoration planners should take time to carefully select an appropriate and effective metric set. To help planners with this task, this technical note accomplishes the following: 1. Reviews current USACE ecosystem restoration planning and monitoring policy, regulations and guidelines. 2. Explains the importance of metric selection and its roles during planning and post-construction monitoring and assessment. 3. Reviews common options for identifying and selecting metrics including conceptual modeling, historical precedence, and best professional judgment. 4. Presents two metric evaluation methods, screening and multi-criteria decision analysis. 5. Discusses metric application to ecosystem restoration project planning and monitoring.

Matteo Convertino; Kelsie Baker; Connie Lu; John T. Vogel; Kyle Mckay; Igor Linkov

2013-01-01T23:59:59.000Z

56

Design and Development of Performance Metrics for Elite Runners  

E-Print Network (OSTI)

RAM Flash Sensor Physiological Signals CPU Power Management Serial ADC Sensor Wired Tx/ Rx Offline AnalysisRAM or flash. Can upload sensor data to either an online analysis

Mittal, Nikhil R.

2012-01-01T23:59:59.000Z

57

Objective performance metrics for improved space telerobotics training  

E-Print Network (OSTI)

NASA astronauts undergo many hours of formal training and self-study to gain proficiency in space teleoperation tasks. After each lesson, instructors score an astronaut's performance in several broad skill categories, ...

Forman, Rachel Emily

2011-01-01T23:59:59.000Z

58

Home Area Network Performance Metrics and Monitoring - Phase 2  

Science Conference Proceedings (OSTI)

In considering a particular communication technology and protocol, one of the earliest steps that must be taken is to review features and performance claims by its publishing agency (manufacturer or supporting alliance). These claims are based on specific conditions, generally ideal ones. This is mainly because of practicality issues since it is difficult if not impossible to cover a technologys performance in every possible condition where it may be used. This approach also tends to put that technology ...

2010-12-31T23:59:59.000Z

59

Defining and applying prediction performance metrics on a recurrent NARX time series model  

Science Conference Proceedings (OSTI)

Nonlinear autoregressive moving average with exogenous inputs (NARMAX) models have been successfully demonstrated for modeling the input-output behavior of many complex systems. This paper deals with the proposition of a scheme to provide time series ... Keywords: NARX models, Prediction performance metrics, Recurrent radial basis function network, Time series prediction

Ryad Zemouri; Rafael Gouriveau; Noureddine Zerhouni

2010-08-01T23:59:59.000Z

60

Documenting performance metrics in a building life-cycle information system  

SciTech Connect

In order to produce a new generation of green buildings, it will be necessary to clearly identify their performance requirements, and to assure that these requirements are met. A long-term goal is to provide building decision-makers with the information and tools needed to cost-effectively assure the desired performance of buildings, as specified by stakeholders, across the complete life cycle of a building project. A key element required in achieving this goal is a method for explicitly documenting the building performance objectives that are of importance to stakeholders. Such a method should clearly define each objective (e.g., cost, energy use, and comfort) and its desired level of performance. This information is intended to provide quantitative benchmarks useful in evaluating alternative design solutions, commissioning the newly constructed building, and tracking and maintaining the actual performance of the occupied building over time. These quantitative benchmarks are referred to as performance metrics, and they are a principal element of information captured in the Building Life-cycle Information System (BLISS). An initial implementation of BLISS is based on the International Alliance for Interoperability`s (IAI) Industry Foundation Classes (IFC), an evolving data model under development by a variety of architectural, engineering, and construction (AEC) industry firms and organizations. Within BLISS, the IFC data model has been extended to include performance metrics and a structure for archiving changing versions of the building information over time. This paper defines performance metrics, discusses the manner in which BLISS is envisioned to support a variety of activities related to assuring the desired performance of a building across its life cycle, and describes a performance metric tracking tool, called Metracker, that is based on BLISS.

Hitchcock, R.J.; Piette, M.A.; Selkowitz, S.E.

1998-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Specification and implementation of IFC based performance metrics to support building life cycle assessment of hybrid energy systems  

SciTech Connect

Minimizing building life cycle energy consumption is becoming of paramount importance. Performance metrics tracking offers a clear and concise manner of relating design intent in a quantitative form. A methodology is discussed for storage and utilization of these performance metrics through an Industry Foundation Classes (IFC) instantiated Building Information Model (BIM). The paper focuses on storage of three sets of performance data from three distinct sources. An example of a performance metrics programming hierarchy is displayed for a heat pump and a solar array. Utilizing the sets of performance data, two discrete performance effectiveness ratios may be computed, thus offering an accurate method of quantitatively assessing building performance.

Morrissey, Elmer; O' Donnell, James; Keane, Marcus; Bazjanac, Vladimir

2004-03-29T23:59:59.000Z

62

Integrated Planning and Performance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance Management (IPPM) Head Program Administrator Planning Coordination Performance Analysis Chief Operating Officer Risk Analysis Lab PlanningGoal Setting Process ...

63

Environmental Management Performance Report May 2000  

Science Conference Proceedings (OSTI)

The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-FU) a report of the Project Hanford Management Contractors' (PHMC)' Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, Metrics, and Cost/Schedule data contained herein is as of March 31, 2000. All other information is updated as noted.

EDER, D.M.

2000-05-01T23:59:59.000Z

64

Normalization of Process Safety Metrics  

E-Print Network (OSTI)

This study is aimed at exploring new process safety metrics for measuring the process safety performance in processing industries. Following a series of catastrophic incidents such as the Bhopal chemical tragedy (1984) and Phillips 66 explosion (1989), process safety became a more important subject than ever. These incidents triggered the development and promulgation of the Process Safety Management (PSM) standard in 1992. While PSM enables management to optimize their process safety programs and organizational risks, there is an emerging need to evaluate the process safety implementation across an organization through measurements. Thus, the process safety metric is applied as a powerful tool that measures safety activities, status, and performance within PSM. In this study, process safety lagging metrics were introduced to describe the contribution of process related parameters in determining the safety performance of an organization. Lagging metrics take process safety incidents as the numerator and divide it by different process-related denominators. Currently a process lagging metric (uses work hours as denominator) introduced by the Center for Chemical Process Safety (CCPS) has been used to evaluate the safety performance in processing industries. However, this lagging metric doesn't include enough process safety information. Therefore, modified denominators are proposed in this study and compared with the existing time-based denominator to validate the effectiveness and applicability of the new metrics. Each proposed metric was validated using available industry data. Statistical unitization method has converted incident rates of different ranges for the convenience of comparison. Trend line analysis was the key indication for determining the appropriateness of new metrics. Results showed that some proposed process-related metrics have the potential as alternatives, along with the time-based metric, to evaluate process safety performance within organizations.

Wang, Mengtian

2012-08-01T23:59:59.000Z

65

Emergency Management Limited Scope Performance Test Inspectors...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management Oversight (HS-63) Emergency Management Limited Scope Performance Test Inspectors Guide March 2008 Emergency Management Performance Test Inspectors Guide...

66

Environmental Management Performance Measures, IG-0561 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Centers Field Sites Power Marketing Administration Other Agencies You are here Home Environmental Management Performance Measures, IG-0561 Environmental Management...

67

Real-time performance monitoring and management system  

SciTech Connect

A real-time performance monitoring system for monitoring an electric power grid. The electric power grid has a plurality of grid portions, each grid portion corresponding to one of a plurality of control areas. The real-time performance monitoring system includes a monitor computer for monitoring at least one of reliability metrics, generation metrics, transmission metrics, suppliers metrics, grid infrastructure security metrics, and markets metrics for the electric power grid. The data for metrics being monitored by the monitor computer are stored in a data base, and a visualization of the metrics is displayed on at least one display computer having a monitor. The at least one display computer in one said control area enables an operator to monitor the grid portion corresponding to a different said control area.

Budhraja, Vikram S. (Los Angeles, CA); Dyer, James D. (La Mirada, CA); Martinez Morales, Carlos A. (Upland, CA)

2007-06-19T23:59:59.000Z

68

Lessons from the private sector on performance-based management  

SciTech Connect

Implementation of the Government Performance and Results Act of 1993 (GPRA) has provided a unique challenge for Federal Agencies, such as the Department of Energy (DOE) Office of Waste Management (OWM). While performance measurement, as required by GPRA, is new to Federal Agencies, private industry has applied it at all organizational levels to better manage their operations for some time. There has been significant discussion about how the private sector uses performance measures, but there have been very few empirical studies systematically examining their use. To gather information on comparable private industry practices, waste management industry firms were surveyed through questionnaires and follow-on interviews. Questionnaires were sent to 75 waste management firms throughout the United States and Canada. Twenty-four percent of the firms responded to the questionnaire and participated in the follow-on interviews. The questionnaires were typically completed by vice-presidents or senior financial officers. Information collected from the questionnaire and follow-on interviews provided valuable insight into industry practices in the area of performance measurement. This paper discusses the study results and how they can be incorporated in the DOE OWM performance measures and influence the character of the ``critical few`` metrics used by senior DOE managers.

Stoeckle, K.E. [USDOE (United States). Office of Waste Management; Kolster, W.G. [Argonne National Lab., IL (United States); Shangraw, R.F. [Project Performance Corp. (United States)

1996-03-01T23:59:59.000Z

69

Environmental Management Performance Report 11/1999  

Science Conference Proceedings (OSTI)

The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management performance by: US Department of Energy, Richland Operation

EDER, D.M.

2000-02-01T23:59:59.000Z

70

Federal Energy Management Program: Energy Savings Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Savings Performance Contracts to someone by E-mail Share Federal Energy Management Program: Energy Savings Performance Contracts on Facebook Tweet about Federal Energy...

71

Using Key Performance Indicators to Manage Energy Costs  

E-Print Network (OSTI)

Modern management systems rely heavily on information technology to set goals, track performance and communicate results. Energy management approaches (such as those offered by the US Department of Energy and Natural Resources Canada) and measurement and verification protocols (such as IPMVP 2001) often highlight the importance an information system has in maximizing results. The increasing adoption of energy information systems has led, however, to an interesting paradox: while it is now cost-effective to collect much more data than ever before, many energy managers find themselves drowning in the volume of data generated. Business information systems faced a similar challenge a decade ago, and it is now common practice to use Key Performance Indicators (KPIs) to summarize volumes of data into a few critical “nuggets” of actionable information. These KPIs provide both the metrics that will be used to determine the success of a business plan as well as the timely information managers need to track performance and make adjustments to ensure success. A similar approach can be used in the practice of energy management, where KPIs can be designed to measure the success of key elements in an energy management plan and provide energy managers with the timely “nuggets” of information they need to ensure success. This paper describes how to define and use KPIs to track the performance and measure the success of an energy management plan. A framework is provided to assist in selecting measurable goals from an energy management plan and determine the raw data and processing required to generate the associated KPIs.

Van Gorp, J. C.

2005-01-01T23:59:59.000Z

72

Environmental Management Performance Report July 2000  

SciTech Connect

The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcont.

EDER, D.M.

2000-07-01T23:59:59.000Z

73

Data Collection for Project Management and Performance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Data Collection for Project Management and Performance Donald Macdonald November 19, 2009 DOE's PM Approach Provide DOE with project information to allow DOE to adequately...

74

Federal Energy Management Program: Energy Savings Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Financing Specialists to someone by E-mail Share Federal Energy Management Program: Energy Savings Performance Contract Federal Financing Specialists on Facebook Tweet...

75

Federal Energy Management Program: Energy Savings Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy - Energy Efficiency and Renewable Energy Federal Energy Management Program Energy Savings Performance Contracts Laws and Regulations Legislation authorizing energy...

76

Federal Energy Management Program: Energy Savings Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy - Energy Efficiency and Renewable Energy Federal Energy Management Program Energy Savings Performance Contract Federal Financing Specialists FEMP's Federal financing...

77

Federal Energy Management Program: Energy Savings Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Printable Version Share this resource Send a link to Federal Energy Management Program: Energy Savings Performance Contract Training to someone by E-mail Share Federal Energy...

78

SAPHIRE 8 Quality Assurance Software Metrics Report  

SciTech Connect

The purpose of this review of software metrics is to examine the quality of the metrics gathered in the 2010 IV&V and to set an outline for results of updated metrics runs to be performed. We find from the review that the maintenance of accepted quality standards presented in the SAPHIRE 8 initial Independent Verification and Validation (IV&V) of April, 2010 is most easily achieved by continuing to utilize the tools used in that effort while adding a metric of bug tracking and resolution. Recommendations from the final IV&V were to continue periodic measurable metrics such as McCabe's complexity measure to ensure quality is maintained. The four software tools used to measure quality in the IV&V were CodeHealer, Coverage Validator, Memory Validator, Performance Validator, and Thread Validator. These are evaluated based on their capabilities. We attempted to run their latest revisions with the newer Delphi 2010 based SAPHIRE 8 code that has been developed and was successful with all of the Validator series of tools on small tests. Another recommendation from the IV&V was to incorporate a bug tracking and resolution metric. To improve our capability of producing this metric, we integrated our current web reporting system with the SpiraTest test management software purchased earlier this year to track requirements traceability.

Kurt G. Vedros

2011-08-01T23:59:59.000Z

79

THERMAL PERFORMANCE OF MANAGED WINDOW SYSTEMS  

E-Print Network (OSTI)

PERFORMANCE OF MANAGED WINDOW SYSTEMS S. E. Selkowitz and V.York, N.Y. , (1971). Windows for Energy Efficient Buildings,thermal performance of a window system are its overall heat

Selkowitz, S. E.

2011-01-01T23:59:59.000Z

80

Prosocial Values and Performance Management Theory: The Link between Perceived Social Impact and Performance Information Use  

E-Print Network (OSTI)

The La Follette School takes no stand on policy issues; opinions expressed in this paper reflect the views of individual researchers and authors. Prosocial Values and Performance Management Theory: The Link between Perceived Social Impact and Performance Information Use Performance management techniques are presented as control mechanisms to save money and hold bureaucrats accountable, consistent with negative agency theory assumptions of bureaucrats. We propose an alternative theory of performance management that rests on prosocial values. This theory argues that public servants who see the social impact of their work are more likely to use performance metrics. We operationalize performance information use in terms of purposeful use for internal organizational means, and political use for external legitimation. Those who perceive that their work has a strong social impact are likely to pursue both types of uses, to improve both the effectiveness of their services, and to maintain resources. The data comes for a cross-sectional survey of U.S. public and non-profit employees. 1

La Follette; Donald P. Moynihan; Sanjay K. Pandey; Bradley E. Wright

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Performance metrics and life-cycle information management for building performance assurance  

E-Print Network (OSTI)

is influenced by chiller and cooling tower efficiencies andyr) Chiller (kW/ton) Cooling Tower (kW/ton) Cooling Load (

Hitchcock, R.J.; Piette, M.A.; Selkowitz, S.E.

1998-01-01T23:59:59.000Z

82

Self-benchmarking Guide for Data Centers: Metrics, Benchmarks, Actions  

SciTech Connect

This guide describes energy efficiency metrics and benchmarks that can be used to track the performance of and identify potential opportunities to reduce energy use in data centers. This guide is primarily intended for personnel who have responsibility for managing energy use in existing data centers - including facilities managers, energy managers, and their engineering consultants. Additionally, data center designers may also use the metrics and benchmarks described in this guide for goal-setting in new construction or major renovation. This guide provides the following information: (1) A step-by-step outline of the benchmarking process. (2) A set of performance metrics for the whole building as well as individual systems. For each metric, the guide provides a definition, performance benchmarks, and potential actions that can be inferred from evaluating this metric. (3) A list and descriptions of the data required for computing the metrics. This guide is complemented by spreadsheet templates for data collection and for computing the benchmarking metrics. This guide builds on prior data center benchmarking studies supported by the California Energy Commission. Much of the benchmarking data are drawn from the LBNL data center benchmarking database that was developed from these studies. Additional benchmark data were obtained from engineering experts including facility designers and energy managers. This guide also builds on recent research supported by the U.S. Department of Energy's Save Energy Now program.

Mathew, Paul; Ganguly, Srirupa; Greenberg, Steve; Sartor, Dale

2009-07-13T23:59:59.000Z

83

DOE SES PERFORMANCE MANAGEMENT SYSTEM  

Energy.gov (U.S. Department of Energy (DOE))

This plan covers Department of Energy SES executives, as well as those Presidential appointees who have retained eligibility for SES performance appraisals and awards under 5 U.S.C. 3392(c).

84

Metric Program  

Science Conference Proceedings (OSTI)

... The NIST metric program encourages the use of the SI in all facets of education, including honing of worker skills. All Levels of Government. ...

2013-01-11T23:59:59.000Z

85

Metrics-Based Feedback Cycles for Software Life-Cycle Management and Process Improvement  

E-Print Network (OSTI)

This paper summarizes a global organizational feedback cycle, composed of four component feedback cycles, by which the COCOMO II cost estimation model [Boehm et al., 2000] can be used for (1) project or product line scoping; (2) project or product line management; (3) model recalibration to changing circumstances; and (4) evaluation project, product line, or organizational continuous process improvement initiatives

Barry Boehm

2000-01-01T23:59:59.000Z

86

Cleanroom Energy Efficiency: Metrics and Benchmarks  

Science Conference Proceedings (OSTI)

Cleanrooms are among the most energy-intensive types of facilities. This is primarily due to the cleanliness requirements that result in high airflow rates and system static pressures, as well as process requirements that result in high cooling loads. Various studies have shown that there is a wide range of cleanroom energy efficiencies and that facility managers may not be aware of how energy efficient their cleanroom facility can be relative to other cleanroom facilities with the same cleanliness requirements. Metrics and benchmarks are an effective way to compare one facility to another and to track the performance of a given facility over time. This article presents the key metrics and benchmarks that facility managers can use to assess, track, and manage their cleanroom energy efficiency or to set energy efficiency targets for new construction. These include system-level metrics such as air change rates, air handling W/cfm, and filter pressure drops. Operational data are presented from over 20 different cleanrooms that were benchmarked with these metrics and that are part of the cleanroom benchmark dataset maintained by Lawrence Berkeley National Laboratory (LBNL). Overall production efficiency metrics for cleanrooms in 28 semiconductor manufacturing facilities in the United States and recorded in the Fabs21 database are also presented.

International SEMATECH Manufacturing Initiative; Mathew, Paul A.; Tschudi, William; Sartor, Dale; Beasley, James

2010-07-07T23:59:59.000Z

87

Surveillance Metrics Sensitivity Study  

Science Conference Proceedings (OSTI)

In September of 2009, a Tri-Lab team was formed to develop a set of metrics relating to the NNSA nuclear weapon surveillance program. The purpose of the metrics was to develop a more quantitative and/or qualitative metric(s) describing the results of realized or non-realized surveillance activities on our confidence in reporting reliability and assessing the stockpile. As a part of this effort, a statistical sub-team investigated various techniques and developed a complementary set of statistical metrics that could serve as a foundation for characterizing aspects of meeting the surveillance program objectives. The metrics are a combination of tolerance limit calculations and power calculations, intending to answer level-of-confidence type questions with respect to the ability to detect certain undesirable behaviors (catastrophic defects, margin insufficiency defects, and deviations from a model). Note that the metrics are not intended to gauge product performance but instead the adequacy of surveillance. This report gives a short description of four metrics types that were explored and the results of a sensitivity study conducted to investigate their behavior for various inputs. The results of the sensitivity study can be used to set the risk parameters that specify the level of stockpile problem that the surveillance program should be addressing.

Bierbaum, R; Hamada, M; Robertson, A

2011-11-01T23:59:59.000Z

88

Surveillance metrics sensitivity study.  

SciTech Connect

In September of 2009, a Tri-Lab team was formed to develop a set of metrics relating to the NNSA nuclear weapon surveillance program. The purpose of the metrics was to develop a more quantitative and/or qualitative metric(s) describing the results of realized or non-realized surveillance activities on our confidence in reporting reliability and assessing the stockpile. As a part of this effort, a statistical sub-team investigated various techniques and developed a complementary set of statistical metrics that could serve as a foundation for characterizing aspects of meeting the surveillance program objectives. The metrics are a combination of tolerance limit calculations and power calculations, intending to answer level-of-confidence type questions with respect to the ability to detect certain undesirable behaviors (catastrophic defects, margin insufficiency defects, and deviations from a model). Note that the metrics are not intended to gauge product performance but instead the adequacy of surveillance. This report gives a short description of four metrics types that were explored and the results of a sensitivity study conducted to investigate their behavior for various inputs. The results of the sensitivity study can be used to set the risk parameters that specify the level of stockpile problem that the surveillance program should be addressing.

Hamada, Michael S. (Los Alamos National Laboratory); Bierbaum, Rene Lynn; Robertson, Alix A. (Lawrence Livermore Laboratory)

2011-09-01T23:59:59.000Z

89

Data Collection for Project Management and Performance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Data Collection for Project Data Collection for Project Management and Performance Donald Macdonald November 19, 2009 DOE's PM Approach  Provide DOE with project information to allow DOE to adequately monitor project progress  Consistent with management of Financial Assistance projects  Awardee to manage project's execution and use their standard systems while providing DOE information from your management systems DOE's PM Approach  DOE Role  Monitor performance based on awardee information  Proactively anticipate and resolve issues that impact the project's success Project Execution Plan  DOE is requesting a set of high level documents be provided at project initiation  Work Breakdown Structure (WBS)  Responsibility Assignment Matrix  Risk Management Plan

90

Proceedings of the 10th Performance Metrics for Intelligent Systems Workshop  

Science Conference Proceedings (OSTI)

In this 10th workshop, we focus our attention to systems which are designed to work closely with humans. The theme of PerMIS'10 is key role of performance assessment in developing intelligent systems that can co-exist with humans towards improving the ...

Elena Messina; Raj Madhavan

2010-09-01T23:59:59.000Z

91

Environmental Management Performance Report November 2000  

Science Conference Proceedings (OSTI)

The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

EDER, D.M.

2000-11-01T23:59:59.000Z

92

Environmental Management Performance Report for December 1999  

Science Conference Proceedings (OSTI)

The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S&T) Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A listing of what is contained in the sections can be found in the Table of Contents.

EDER, D.M.

2000-02-16T23:59:59.000Z

93

Environmental Management Performance Report April 2000  

Science Conference Proceedings (OSTI)

The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S and T) Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries.

EDER, D.M.

2000-04-01T23:59:59.000Z

94

Measuring Performance and Benchmarking Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Measuring Performance and Measuring Performance and Benchmarking Project Management at the Department of Energy Measuring Performance and Benchmarking Project Management at the Department of Energy Committee for Oversight and Assessment of U.S. Department of Energy Project Management Board on Infrastructure and the Constructed Environment Division on Engineering and Physical Sciences THE NATIONAL ACADEMIES PRESS WASHINGTON, D.C. www.nap.edu THE NATIONAL ACADEMIES PRESS 500 Fifth Street, N.W. Washington, DC 20001 NOTICE: The project that is the subject of this report was approved by the Governing Board of the National Research Council, whose members are drawn from the councils of the National Academy of Sciences, the National Academy of Engineering, and the Institute of Medicine. The members of the

95

Metric Units  

Science Conference Proceedings (OSTI)

... A, B, C, D, E, F, G, H, I, J. 1, Steam Point Calculator: Metric Units, Elevation Converter, ... 6, Height of steam point apparatus above ground (m), 0, m, ...

2011-12-22T23:59:59.000Z

96

Metric Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

MODERN GRID S T R A T E G Y Smart Grid Metrics Monitoring our Progress Smart Grid Implementation Workshop Joe Miller - Modern Grid Team June 19, 2008 1 Conducted by the National...

97

Data Collection for Project Management and Performance, November...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Project Management and Performance, November 19, 2009 (POWERPOINT) Data Collection for Project Management and Performance, November 19, 2009 (POWERPOINT) Data Collection for...

98

Use of energy management systems for performance monitoring of...  

NLE Websites -- All DOE Office Websites (Extended Search)

Use of energy management systems for performance monitoring of industrial load-shaping measures Title Use of energy management systems for performance monitoring of industrial...

99

Environmental Management Performance Report June 2000  

SciTech Connect

The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.

EDER, D.M.

2000-06-01T23:59:59.000Z

100

Environmental Management Performance Report September 2000  

SciTech Connect

The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of July 31, 2000. All other information is updated as of August 24, unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular area. Green boxes denote on schedule. Yellows denote behind schedule but recoverable. Red is either missed or unrecoverable.

EDER, D.M.

2000-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

ARM - 2006 Performance Metrics  

NLE Websites -- All DOE Office Websites (Extended Search)

weather forecast models. Data from the European Center for Medium Range Weather Forecasts (ECMWF) model will be used as a constraint. These profiles will then be compared...

102

Federal Energy Management Program: Energy Savings Performance Contract Case  

NLE Websites -- All DOE Office Websites (Extended Search)

Savings Savings Performance Contract Case Studies to someone by E-mail Share Federal Energy Management Program: Energy Savings Performance Contract Case Studies on Facebook Tweet about Federal Energy Management Program: Energy Savings Performance Contract Case Studies on Twitter Bookmark Federal Energy Management Program: Energy Savings Performance Contract Case Studies on Google Bookmark Federal Energy Management Program: Energy Savings Performance Contract Case Studies on Delicious Rank Federal Energy Management Program: Energy Savings Performance Contract Case Studies on Digg Find More places to share Federal Energy Management Program: Energy Savings Performance Contract Case Studies on AddThis.com... Energy Savings Performance Contracts Assistance & Contacts

103

Managing Stakeholder Requirements in High Performance Computing Procurement  

E-Print Network (OSTI)

Managing Stakeholder Requirements in High Performance Computing Procurement John Rooksby1 , Mark Department of Management, Lancaster University High Performance Computing (HPC) facilities are provided strategy can rigorously meet the demands of the potential users. 1 Introduction High Performance Computing

Sommerville, Ian

104

Towards semantic performance measurement systems for supply chain management  

Science Conference Proceedings (OSTI)

The literature on Supply Chain Management (SCM) supports the integration of key business processes, including the performance management process, in order to increase the performance within and between the organisations. Nevertheless, the lack of proper ... Keywords: SCOR, business process management, ontology engineering, performance measurement systems, supply chain management

Artturi Nurmi; Thierry Moyaux; Valérie Botta-Genoulaz

2010-10-01T23:59:59.000Z

105

Environmental Management Performance Report October 2000  

Science Conference Proceedings (OSTI)

This section provides an executive level summary of the performance information covered in this report and is intended to bring to Management's attention that information considered to be most noteworthy. All cost, schedule, milestone commitments, performance measures. and safety data is current as of August 31. Accomplishments, Issues and Integration items are current as of September 18 unless otherwise noted. The section begins with a description of notable accomplishments that have occurred since the last report and are considered to have made the greatest contribution toward safe, timely, and cost-effective clean up. Following the accomplishment section is an overall fiscal year-to-date summary analysis addressing cost, schedule, and milestone performance. Overviews of safety ensue. The next segment of the Executive Summary, entitled Critical Issues, is designed to identify the high-level challenges to achieving cleanup progress. The next section includes FY 2000 EM Management Commitment High Visibility Project Milestones and Critical Few Performance Measures. The Key Integration Activities section follows next, highlighting PHMC activities that cross contractor boundaries and demonstrate the shared value of partnering with other Site entities to accomplish the work. Concluding the Executive Summary, a forward-looking synopsis of Upcoming Planned Key Events is provided.

EDER, D.M.

2000-10-01T23:59:59.000Z

106

Federal Energy Management Program: Energy Savings Performance Contract  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Savings Energy Savings Performance Contract Project Facilitators to someone by E-mail Share Federal Energy Management Program: Energy Savings Performance Contract Project Facilitators on Facebook Tweet about Federal Energy Management Program: Energy Savings Performance Contract Project Facilitators on Twitter Bookmark Federal Energy Management Program: Energy Savings Performance Contract Project Facilitators on Google Bookmark Federal Energy Management Program: Energy Savings Performance Contract Project Facilitators on Delicious Rank Federal Energy Management Program: Energy Savings Performance Contract Project Facilitators on Digg Find More places to share Federal Energy Management Program: Energy Savings Performance Contract Project Facilitators on AddThis.com...

107

Metrics for Evaluating the Accuracy of Solar Power Forecasting (Presentation)  

DOE Green Energy (OSTI)

This presentation proposes a suite of metrics for evaluating the performance of solar power forecasting.

Zhang, J.; Hodge, B.; Florita, A.; Lu, S.; Hamann, H.; Banunarayanan, V.

2013-10-01T23:59:59.000Z

108

EU Metric Directive  

Science Conference Proceedings (OSTI)

... View EU Metric Directive Commission Services Working Document PDF ... of European Union (EU) Meeting on Metric Directives (2005); Packaging ...

2012-12-13T23:59:59.000Z

109

How ENERGY STAR Helps Manufacturers Improve the Energy Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

against the industry nationally Energy Tracking Tool - Helps establish production-based energy intensity metrics, set goals, and track performance Portfolio Manager - Scores the...

110

Metrics: How to Improve Key Business Results, 1st edition  

Science Conference Proceedings (OSTI)

Metrics are a hot topic. Executive leadership, boards of directors, management, and customers are all asking for data-based decisions. As a result, many managers, professionals, and change agents are asked to develop metrics, but have no clear idea ...

Martin Klubeck

2011-12-01T23:59:59.000Z

111

Metric Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

MODERN GRID MODERN GRID S T R A T E G Y Smart Grid Metrics Monitoring our Progress Smart Grid Implementation Workshop Joe Miller - Modern Grid Team June 19, 2008 1 Conducted by the National Energy Technology Laboratory Funded by the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability 2 Office of Electricity Delivery and Energy Reliability MODERN GRID S T R A T E G Y Many are working on the Smart Grid FERC DOE-OE Grid 2030 GridWise Alliance EEI NERC (FM) DOE/NETL Modern Grid Strategy GridWise Program GridWorks NW GridWise Testbed GridApps CERTS DOE-OE CEC PIER NYSERDA CPUC AMI Galvin Initiative EPRI Intelligrid PSERC NIST GWAC Utility AMI Open AMI CEC PIER EPACT05 Nat'al Labs EISA-2007 IEEE DOE Smart Grid Task Force 3 Office of Electricity Delivery and Energy Reliability

112

Comparison of Performance Metrics for QPSK and OQPSK Transmission Using Root Raised Cosine and Raised Cosine Pulse shaping Filters for Applications in Mobile Communication  

E-Print Network (OSTI)

Quadrature Phase Shift Keying (QPSK) and Offset Quadrature Phase Shift Keying (OQPSK) are two well accepted modulation techniques used in Code Division Multiple Access (CDMA) system. The Pulse Shaping Filters play an important role in digital transmission. The type of Pulse Shaping Filter used, and its behavior would influence the performance of the communication system. This in turn, would have an effect on the performance of the Mobile Communication system, in which the digital communication technique has been employed. In this paper we have presented comparative study of some performance parameters or performance metrics of a digital communication system like, Error Vector Magnitude (EVM), Magnitude Error, Phase Error and Bandwidth Efficiency for a QPSK transmission system. Root Raised Cosine (RRC) and Raised Cosine (RC) Pulse shaping filters have been used for comparison. The measurement results serve as a guideline to the system designer to select the proper pulse shaping filter with the appropriate valu...

Chattopadhyay, Sudipta

2009-01-01T23:59:59.000Z

113

EM Hosts Second Contract Performance and Management Workshop in 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Contract Performance and Management Workshop in Second Contract Performance and Management Workshop in 2012 EM Hosts Second Contract Performance and Management Workshop in 2012 August 29, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM hosted its second Environmental Management Contract Performance and Management Workshop at DOE headquarters today. The goal of the workshop was to identify opportunities related to EM's goal to improve project, budget and contract management with the objective of delivering results on time, within cost and with world-class technical competencies. Participants in the workshop laid out steps to successfully implement opportunities identified to improve contract management at the first EM contract performance and management workshop held in February. In addition to DOE senior leadership, participants included corporate

114

EM Hosts Second Contract Performance and Management Workshop in 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Hosts Second Contract Performance and Management Workshop in EM Hosts Second Contract Performance and Management Workshop in 2012 EM Hosts Second Contract Performance and Management Workshop in 2012 August 29, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM hosted its second Environmental Management Contract Performance and Management Workshop at DOE headquarters today. The goal of the workshop was to identify opportunities related to EM's goal to improve project, budget and contract management with the objective of delivering results on time, within cost and with world-class technical competencies. Participants in the workshop laid out steps to successfully implement opportunities identified to improve contract management at the first EM contract performance and management workshop held in February. In addition to DOE senior leadership, participants included corporate

115

High performance in Procurement Risk Management  

E-Print Network (OSTI)

Research on Procurement Risk Management has been conducted by Accenture and MIT in order to identify the best practices used to manage commodity price volatility and supplier risk. In today's increasingly turbulent market ...

Olsha, Maya (Olsha-Yehiav)

2010-01-01T23:59:59.000Z

116

Federal Energy Management Program: Energy Savings Performance Contracts  

NLE Websites -- All DOE Office Websites (Extended Search)

Contracts Laws and Regulations to someone by E-mail Contracts Laws and Regulations to someone by E-mail Share Federal Energy Management Program: Energy Savings Performance Contracts Laws and Regulations on Facebook Tweet about Federal Energy Management Program: Energy Savings Performance Contracts Laws and Regulations on Twitter Bookmark Federal Energy Management Program: Energy Savings Performance Contracts Laws and Regulations on Google Bookmark Federal Energy Management Program: Energy Savings Performance Contracts Laws and Regulations on Delicious Rank Federal Energy Management Program: Energy Savings Performance Contracts Laws and Regulations on Digg Find More places to share Federal Energy Management Program: Energy Savings Performance Contracts Laws and Regulations on AddThis.com... Energy Savings Performance Contracts

117

Supervisory - Non-Supervisory Employee Performance Management and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory - Non-Supervisory Employee Performance Management and Supervisory - Non-Supervisory Employee Performance Management and Recognition Program Desk Reference Supervisory - Non-Supervisory Employee Performance Management and Recognition Program Desk Reference This Desk Reference is designed to be used in conjunction with DOE O 331.1, Performance Management and Employee Recognition Programs. It was developed to provide uniformity to the interpretation of DOE O 331.1, and is intended to serve as a good reference for supplemental implementation information for DOE's performance management and recognition programs. Each section provides pertinent information addressing the four phases of the DOE performance appraisal process. Supervisory/Non-Supervisory Employee Performance Management and Recognition Program Desk Reference

118

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects:...

119

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90%...

120

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCACAP)...

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCACAP)...

122

Performance of Dynamic Programming methods in airline Revenue Management  

E-Print Network (OSTI)

This thesis evaluates the performance of Dynamic Programming (DP) models as applied to airline Revenue Management (RM) compared to traditional Revenue Management models like EMSRb as DP models offer a theoretically attractive ...

Diwan, Sarvee

2010-01-01T23:59:59.000Z

123

Harmonizing Global Metrics for Data Center Energy Efficiency...  

NLE Websites -- All DOE Office Websites (Extended Search)

Harmonizing Global Metrics for Data Center Energy Efficiency, February 2, 2010 Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers...

124

NEWTON's Metric System Resources  

NLE Websites -- All DOE Office Websites (Extended Search)

Please select any link below. Search this page, using your web browser's search function. Please select any link below. Search this page, using your web browser's search function. Metric System References Do you have a great metric reference link? Please click our Ideas page. Featured Reference Links: Metric (SI) References Metric (SI) References Having trouble with the metric system? Visit the National Institute of Standards and Technology's site about the rules and style conventions of the International System of Units (SI). The Metric System The Metric System Need another reference? Try this site provided by Wikipedia that discusses the metric system and its history in depth. Metric Converter Metric Converter Need to convert to Metric? OnlineConversion.com allows you to convert just about anything to just about anything else. This will let you easily from metric to US Standard notation, and vice versa.

125

Emergency Management Limited Scope Performance Test Inspectors Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management Emergency Management Oversight (HS-63) Emergency Management Limited Scope Performance Test Inspectors Guide March 2008 Emergency Management Performance Test Inspectors Guide Preface i Preface As part of an effort to enhance the appraisal process, the Office of Independent Oversight and the Office of Emergency Management Oversight (HS-63) have prepared a series of documents that collectively provide comprehensive guidance and tools for the evaluation of emergency management programs across the Department of Energy /National Nuclear Security Administration (DOE/NNSA) complex. The Independent Oversight Appraisal Process Protocols describe the philosophy, scope, and general procedures applicable to all independent oversight appraisal activities. The HS-63 Emergency

126

Daylight metrics and energy savings  

SciTech Connect

The drive towards sustainable, low-energy buildings has increased the need for simple, yet accurate methods to evaluate whether a daylit building meets minimum standards for energy and human comfort performance. Current metrics do not account for the temporal and spatial aspects of daylight, nor of occupants comfort or interventions. This paper reviews the historical basis of current compliance methods for achieving daylit buildings, proposes a technical basis for development of better metrics, and provides two case study examples to stimulate dialogue on how metrics can be applied in a practical, real-world context.

Mardaljevic, John; Heschong, Lisa; Lee, Eleanor

2009-12-31T23:59:59.000Z

127

Metrics and Benchmarks for Energy Efficiency in Laboratories  

E-Print Network (OSTI)

2004 pro- vide an additional benchmark. F O R T H E Table 3.Performance Metrics & Benchmarks Notes A performance MetricBTU/sf-yr). A performance Benchmark is a particular value of

Mathew, Paul

2007-01-01T23:59:59.000Z

128

Federal Energy Management Program: High-Performance Sustainable Building  

NLE Websites -- All DOE Office Websites (Extended Search)

High-Performance High-Performance Sustainable Building Design for New Construction and Major Renovations to someone by E-mail Share Federal Energy Management Program: High-Performance Sustainable Building Design for New Construction and Major Renovations on Facebook Tweet about Federal Energy Management Program: High-Performance Sustainable Building Design for New Construction and Major Renovations on Twitter Bookmark Federal Energy Management Program: High-Performance Sustainable Building Design for New Construction and Major Renovations on Google Bookmark Federal Energy Management Program: High-Performance Sustainable Building Design for New Construction and Major Renovations on Delicious Rank Federal Energy Management Program: High-Performance Sustainable Building Design for New Construction and Major Renovations on Digg

129

Use of metrics in an effective ALARA program  

Science Conference Proceedings (OSTI)

ALARA radiological protection programs require metrics to meet their objectives. Sources of metrics include external dosimetry; internal dosimetry; radiological occurrences from the occurrence reporting an processing system (ORPS); and radiological incident reports (RIR). The sources themselves contain an abundance of specific {open_quotes}indicators.{close_quotes} To choose the site-specific indicators that will be tracked and trended requires careful review. Justification is needed to defend the indicators selected and maybe even stronger justification is needed for those indicators that are available, but not chosen as a metric. Historically, the many different sources of information resided in a plethora of locations. Even the same type of metric had data located in different areas and could not be easily totaled for the entire Site. This required the end user to expend valuable time and effort to locate the data they needed. To address this problem, a central metrics database has been developed so that a customer can have all their questions addressed quickly and correctly. The database was developed in the beginning to answer some of the customer`s most frequently asked questions. IL is now also a tool to communicate the status of the radiation protection program to facility managers. Finally, it also addresses requirements contained in the Rad Con manual and the 10CFR835 implementation guides. The database uses currently available, {open_quotes}user friendly,{close_quotes} software and contains information from RIR`s, ORPS, and external dosimetry records specific to ALARA performance indicators. The database is expandable to allow new metrics input. Specific reports have been developed to assist customers in their tracking and trending of ALARA metrics. These include quarterly performance indicator reports, monthly radiological incident reports, monthly external dose history and goals tracking reports, and the future use of performance indexing.

Bates, B.B. Jr. [Los Alamos National Laboratory, NM (United States)

1996-06-01T23:59:59.000Z

130

Performance Auditing of Energy Management Programs  

E-Print Network (OSTI)

With the oil crisis of the 1970's, energy management programs became important to both the private and public sectors. But with the decrease of oil prices in the mid 1980's, interest in energy conservation programs has declined. Nevertheless, energy conservation remains an effective way to reduce operating costs without cutting services. This paper describes a review process that can be used by managers and engineers to improve an organization's overall energy management program. This energy management audit, as it is called, is much more than an energy audit; it is an assessment of the organization's entire system of controlling energy costs. The energy management audit discussed in this paper divides an energy management program into five major areas. Each of these areas is subdivided into basic elements which can then be analyzed and evaluated to see if meets the needs of the organization. The results of the audit provide specific recommendations for improving the organization's energy conservation program cost effectiveness and efficiency.

White, J. A.

1988-01-01T23:59:59.000Z

131

Performance directed energy management for main memory and disks  

Science Conference Proceedings (OSTI)

Much research has been conducted on energy management for memory and disks. Most studies use control algorithms that dynamically transition devices to low power modes after they are idle for a certain threshold period of time. The control algorithms ... Keywords: Disk energy management, adaptation algorithms, control algorithms, low-power design, memory energy management, multiple-power mode device, performance guarantee

Xiaodong Li; Zhenmin Li; Yuanyuan Zhou; Sarita Adve

2005-08-01T23:59:59.000Z

132

CYBER SECURITY METRICS AND MEASURES  

Science Conference Proceedings (OSTI)

... CYBER SECURITY METRICS AND MEASURES ... Keywords: cyber security; metrics; measures; software; computer systems; IT ...

2013-05-07T23:59:59.000Z

133

EM Hosts Contract Performance and Management Workshop | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract Performance and Management Workshop Contract Performance and Management Workshop EM Hosts Contract Performance and Management Workshop February 15, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM hosted the Environmental Management Contract Performance and Management Workshop at DOE headquarters Wednesday. The goal of the workshop was to identify opportunities to improve contract and project management with the objective of delivering results on time and within cost. In addition to DOE senior leadership, participants included corporate representatives from all EM large- and small-business prime cleanup and construction contractors. Deputy Secretary Daniel Poneman delivered the keynote address in a video message. Under Secretary for Nuclear Security Thomas D'Agostino attended the event. "Today's workshop with the corporate representatives provided an excellent

134

EM Hosts Contract Performance and Management Workshop | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hosts Contract Performance and Management Workshop Hosts Contract Performance and Management Workshop EM Hosts Contract Performance and Management Workshop February 15, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM hosted the Environmental Management Contract Performance and Management Workshop at DOE headquarters Wednesday. The goal of the workshop was to identify opportunities to improve contract and project management with the objective of delivering results on time and within cost. In addition to DOE senior leadership, participants included corporate representatives from all EM large- and small-business prime cleanup and construction contractors. Deputy Secretary Daniel Poneman delivered the keynote address in a video message. Under Secretary for Nuclear Security Thomas D'Agostino attended the event. "Today's workshop with the corporate representatives provided an excellent

135

Scaling performance tool MPI communicator management  

Science Conference Proceedings (OSTI)

The Scalasca toolset has successfully demonstrated measurement and analysis scalability on the largest computer systems, however, applications have growing complexity and increasing demands on performance tools. One such application is the PFLOTRAN code ... Keywords: MPI communicators, performance measurement tools, scalability

Markus Geimer; Marc-André Hermanns; Christan Siebert; Felix Wolf; Brian J. N. Wylie

2011-09-01T23:59:59.000Z

136

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A This metric has been overcome by events. Beginning in FY10, EM projects are to be measured against metric #1 above. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12,

137

PROJECT HANFORD MANAGEMENT CONTRACT COSTSAND PERFORMANCE, IG...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

138

Management Controls over Performance Fees in the Idaho National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Controls over Performance Fees in the Idaho National Management Controls over Performance Fees in the Idaho National Laboratory Contract, OAS-M-06-07 Management Controls over Performance Fees in the Idaho National Laboratory Contract, OAS-M-06-07 The Department of Energy (Department) did not always effectively and Fees use performance measures and fees to appropriately reward contractor performance. Specifically, the Department allocated approximately $1.1 million for 3 of the 27 performance measures and fees for Fiscal Year (FY) 2005, which were disproportionately high for the work performed. Four of the 49 measures and fees established for FY 2006 provided the contractor the opportunity to earn $1 million under similar circumstances. Also, some of the performance measures worth $460,000, were implemented well

139

Network Management and Performance Monitoring at SLAC  

E-Print Network (OSTI)

Subjectively, the ultimate measurers of system performance are the users and their perceptions of the performance of their networked applications. The performance of a system is affected by the physical network plant (routers, bridges, hubs, etc.) as well as by every "computer " and peripheral device that is attached to it, and the software running on the computers and devices. Performance monitoring of a network must therefore include computer systems and services monitoring and well as monitoring of the physical network plant. This paper will describe how this challenge has been tackled at SLAC, and how, via the World Wide Web 1,2 , this information is made available for quick perusal by concerned personnel and users. INTRODUCTION The ultimate measure of system performance is the perception of the users. The users' perception is generally based on the response time to various commands they enter at their keyboards. This maybe any command from a print command, the submission of a l...

Logg And; C. A. Logg; R. L. A. Cottrell

1995-01-01T23:59:59.000Z

140

Evaluating The Performance Of Mobile Agents In Network Management  

E-Print Network (OSTI)

Currently, most network management systems are centralized and therefore, they can not scale when the size or the complexity of the network increases. This paper aims to investigate mobile agent scalability in network management, in order to nd when mobile agents improve the management efficiency. We compare mobile agent performance with SNMP one in several simulations. Results show that the mobile agent performs better when the number of managed network elements ranges between two bounds and that the mobile agent is less sensitive to changes on a general topology.

Marcelo Gonçalves Rubinstein; Otto Carlos Muniz Bandeira Duarte; Marcelo Gon#alves Rubinstein; Otto Carlos Muniz B; Eira Duarte

1999-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Effective use of metrics in an ALARA program  

SciTech Connect

ALARA radiological protection programs require metrics to meet their objectives. Sources of metrics include; external dosimetry; internal dosimetry; radiological occurrences from the occurrence reporting and processing system (ORPS); and radiological incident reports (RIR). The sources themselves contain an abundance of specific ``indicators``. To choose the site-specific indicators that will be tracked and trended requires careful review. This required the end users to expend valuable time and effort to locate the data they needed. To address this problem, a central metrics database has been developed so that customers can have all their questions addressed quickly and correctly. The database was developed in the beginning to answer some of the customer`s most frequently asked questions. It is now also a tool to communicate the status of the radiation protection program to facility managers. Finally it also addresses requirements contained in the Rad Con manual and the 10CFR835 implementation guides. The database uses currently available, ``user friendly``, software and contains information from RIR`s, ORPS, and external dosimetry records specific to ALARA performance indicators. The database is expandable to allow new metrics input. Specific reports have been developed to assist customers in their tracking and trending of ALARA metrics.

Bates, B.B. Jr.

1996-07-01T23:59:59.000Z

142

Multi-dimensional building performance data management for continuous commissioning  

Science Conference Proceedings (OSTI)

Current buildings' performance assessment tools are deficient in their ability to integrate and process building monitoring data to generate actionable information that can assist in achieving a higher level of building performance. Therefore, this paper ... Keywords: Building performance, Data warehouse, Energy management, Multi-dimensional data analysis, User interfaces

Ammar Ahmed; Joern Ploennigs; Karsten Menzel; Brian Cahill

2010-11-01T23:59:59.000Z

143

Performance-aware thermal management via task scheduling  

Science Conference Proceedings (OSTI)

High on-chip temperature impairs the processor's reliability and reduces its lifetime. Hardware-level dynamic thermal management (DTM) techniques can effectively constrain the chip temperature, but degrades the performance. We propose an OS-level technique ... Keywords: Thermal management, task scheduling

Xiuyi Zhou; Jun Yang; Marek Chrobak; Youtao Zhang

2010-04-01T23:59:59.000Z

144

Metrics for enterprise transformation  

E-Print Network (OSTI)

The objective of this thesis is to depict the role of metrics in the evolving journey of enterprise transformation. To this end, three propositions are explored: (i) metrics and measurement systems drive transformation, ...

Blackburn, Craig D. (Craig David), S. M. Massachusetts Institute of Technology

2009-01-01T23:59:59.000Z

145

Strategic Energy Management Through Optimizing the Energy Performance of Buildings  

E-Print Network (OSTI)

1/12/2007 Strategic Energy Management Through Optimizing the Energy Performance of Buildings Oak ambitious federal energy goals and achieve energy independence. The energy engineers, building equipment Buildings and Industrial Energy Efficiency areas has engendered a unique, comprehensive capability

146

Metric Conversion Guide  

Science Conference Proceedings (OSTI)

...Documents, U.S. Government Printing Office, Washington, DC 20402-9325 Metric Editorial Guide, 5th ed. (revised), 1993,

147

Metric Conversion Guide  

Science Conference Proceedings (OSTI)

...Documents, U.S. Government Printing Office, Washington, DC 20402-9325 Metric Editorial Guide , 5th ed. (revised), 1993,

148

Self-benchmarking Guide for Data Centers: Metrics, Benchmarks, Actions  

E-Print Network (OSTI)

Purpose This guide describes energy efficiency metrics andthe energy benchmarking approach describe in this guide candesigners and energy managers. This guide also builds on

Mathew, Paul

2010-01-01T23:59:59.000Z

149

Prioritization and management of inter-enterprise collaborative performance  

Science Conference Proceedings (OSTI)

Collaboration among enterprises has gained attention in the business environment as a means to remain competitive. Enterprises that are collaborating look for improving their performance but, in real assessments, they often do not establish efficient ... Keywords: Analytic network process, Case study, Collaboration, Performance management, Renewable energy sector

María-José Verdecho; Juan-Jose Alfaro-Saiz; Raul Rodriguez-Rodriguez

2012-04-01T23:59:59.000Z

150

Environmental Management Performance Report to DOE-RL February 2001  

Science Conference Proceedings (OSTI)

The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford. Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford. Inc. (BHI), and its subcontractors; and Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission. This report is a monthly publication that summarizes EM Site performance under RL, Operations Office. It is organized by the three sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

EDER, D.M.

2001-02-01T23:59:59.000Z

151

Environmental Management Performance Report to DOE-RL November 2001  

SciTech Connect

The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the three sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

EDER, D.M.

2001-11-01T23:59:59.000Z

152

Environmental Management Performance Report to DOE-RL August 2001  

SciTech Connect

The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the three sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

EDER, D.M.

2001-08-01T23:59:59.000Z

153

Federal Energy Management Program: High-Performance Sustainable Building  

NLE Websites -- All DOE Office Websites (Extended Search)

High-Performance Sustainable Building Design for New Construction and Major Renovations High-Performance Sustainable Building Design for New Construction and Major Renovations New construction and major renovations to existing buildings offer Federal agencies opportunities to create sustainable high-performance buildings. High-performance buildings can incorporate energy-efficient designs, sustainable siting and materials, and renewable energy technologies along with other innovative strategies. Also see Guiding Principles for Federal Leadership in High-Performance and Sustainable Buildings. Performance-Based Design Build Typically, architects, engineers, and project managers consider the potential to build a high-performance building to be limited by the initial cost. A different approach-performance-based design build-makes high performance the priority, from start to finish. Contracts are developed that focus on both limiting construction costs and meeting performance targets. The approach is not a source of funding, but rather a strategy to make the most out of limited, appropriated, funds.

154

PerformanceMetricsFY13  

NLE Websites -- All DOE Office Websites (Extended Search)

Pencil Beam") Pencil Beam") Experiment: E-211 CERN BBA Date: 3/11/2013 Time beam delivered (hours): 14.2 Time Promised (hours): 12 Unscheduled accelerator downtime (hours): 1.8 User off (hours): 0 Total Time (delivered+downtime+user off, hours): 16 Charge (electrons/bunch) S2 S10 S19 S20 SCAV Delivered: 1.02e10 1.06e10 1.05e10 8.5e9 9.5e9 Requested: 1e10 1e10 1e10 Not in request Not in request Normalized emittance (mm mrad) S2 (x,y) S4 (x,y) S11 (x,y) S18 (x,y) S20 (x,y) Delivered: 34, 2.7 25, 3.2 40, 6.4 42, 20 Requested: Not in request Not in request Not in request Not in request Not in request Bunch length delivered (rms, microns): 420 Bunch length requested (microns): Not in request

155

PerformanceMetricsFY14  

NLE Websites -- All DOE Office Websites (Extended Search)

Over-compressed, High Charge") Over-compressed, High Charge") Experiment: E-201 DIELECTRIC WAKEFIELD ACCELERATION Date: 10/28/2013 Time beam delivered (hours): 2 Time Promised (hours): 2 Unscheduled accelerator downtime (hours): 0 User off (hours): 0 Total Time (delivered+downtime+user off, hours): 2 Charge (electrons/bunch) S2 S10 S19 S20 SCAV Delivered: 2.0e10 2.1e10 2.1e10 1.6e10 2.1e10 Requested: 2e10 2e10 2e10 2e10 Not in request Normalized emittance (mm mrad) S2 (x,y) S4 (x,y) S11 (x,y) S18 (x,y) S20 (x,y) Delivered: 40,2.3 34,2.1 54,4.8 67,8.4 Unmeasured Requested: Not in request Not in request Not in request Not in request Not in request Bunch length delivered (rms, microns): Unmeasured Bunch length requested (microns): Not in request

156

Use of energy management systems for performance monitoring of industrial  

NLE Websites -- All DOE Office Websites (Extended Search)

Use of energy management systems for performance monitoring of industrial Use of energy management systems for performance monitoring of industrial load-shaping measures Title Use of energy management systems for performance monitoring of industrial load-shaping measures Publication Type Journal Article Year of Publication 1988 Authors Akbari, Hashem, Mashuri Warren, Anibal De T. Almeida, Deborah J. Connell, and Jeffrey P. Harris Journal Energy Volume 13 Pagination 253-263 Abstract We have studied the use of industrial energy management and control systems (EMCSs) for monitoring the performance of electric load-shaping measures in three of California's most electricity-intensive and rapidly growing industrial sectors: food, plastics, and computing equipment and electronics. In this paper, we summarize current load-shaping strategies, report on the current use of EMCSs in selected industries, and recommend ways for electric utility companies to verify the potential of EMCSs for performance monitoring. We conclude that EMCSs can be used to collect and store data for evaluating industrial load shaping. Some sophisticated EMCSs are currently being used for this purpose, mostly in larger electronics firms. Most EMCSs now available need to be customized to monitor a particular facility. We also conclude that electric utility companies can encourage the use of EMCSs for performance monitoring by helping to educate their industrial customers about EMCSs, establishing protocols to standardize communication between EMCSs, and testing EMCSs with data-logging functions at demonstration sites.

157

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 84% Construction 83% Cleanup 85% 77% Pre-CAP 86% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 1st Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 94% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

158

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 88% Construction 87% Cleanup 89% 77% Pre-CAP 92% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 2nd Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 96% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

159

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Final FY 2012 Pre- & Post-CAP Final Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 86% Construction 87% Cleanup 84% 77% Pre-CAP 89% Post-CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 4th Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 100% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

160

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 87% Construction 87% Cleanup 87% 77% Pre-CAP 90% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 3rd Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 98% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Metric in Sports: Bicycling  

Science Conference Proceedings (OSTI)

Bicycling. Tour de France. ... Up-to-date information on the Tour de France 2011 can be found at the official site. Metric Biking Events. ...

2011-12-23T23:59:59.000Z

162

Metrics and Measures - SAMATE  

Science Conference Proceedings (OSTI)

... For instance, weather reports give hurricane intensity on ... 2006] proposed a metric for static analysis tools. ... depending on whether the tool claims to ...

2013-09-09T23:59:59.000Z

163

INEAP Metrics Report  

Science Conference Proceedings (OSTI)

... Opportunities of the Current Usage of Metrics; ... consumption of non-local, non-renewable, non-recyclable ... recycled materials, water, energy and fuels ...

2012-04-30T23:59:59.000Z

164

Metrics White Paper Introduction  

E-Print Network (OSTI)

Metrics White Paper March 2010 Introduction Through the years, Unidata has conducted metrics, strategic partners, presentations, scientific papers, budgets, proposals, and other instances where or tools from Unidata's web site. Determining the classification of data to be captured, ad hoc committees

165

Sustainable Disposal Cell Covers: Legacy Management Practices, Improvements, and Long-Term Performance  

Energy.gov (U.S. Department of Energy (DOE))

Sustainable Disposal Cell Covers: Legacy Management Practices, Improvements, and Long-Term Performance

166

STAR METRICS | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STAR METRICS STAR METRICS May 4, 2011 - 4:47pm Addthis Energy continues to define Phase II of the STAR METRICS program, a collaborative initiative to track Research and Development...

167

Discussion for Metrics and Benefits Data Collection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metrics and Benefits Analysis for Metrics and Benefits Analysis for the ARRA Smart Grid Programs Joe Paladino Office of Electricity Delivery and Energy Reliability U.S. Department of Energy OE Electricity Advisory Committee Meeting March 10, 2011 140 ARRA-Funded Smart Grid Projects 1 Customer Systems Customer Systems Customer Systems Customer Systems SGIG/SGDP/RDSI Areas of Smart Grid Technology Deployment Customer Systems Advance Metering Infrastructure Electric Distribution Systems Electric Transmission Systems * Displays * Portals * Energy management * Direct load controls * Smart meters * Data management * Back office integration * Switches * Feeder optimization * Equipment monitoring * Energy Storage * Wide area monitoring and visualization * Synchrophasor Technology * Energy Storage Customer Systems Equipment Manufacturing

168

Thermodynamic data management system for nuclear waste disposal performance assessment  

Science Conference Proceedings (OSTI)

Thermodynamic property values for use in assessing the performance of a nuclear waste repository are described. More emphasis is on a computerized data base management system which facilitates use of the thermodynamic data in sensitivity analysis and other studies which critically assess the performance of disposal sites. Examples are given of critical evaluation procedures; comparison of apparent equilibrium constants calculated from the data base, with other work; and of correlations useful in estimating missing values of both free energy and enthalpy of formation for aqueous species. 49 refs., 11 figs., 6 tabs.

Phillips, S.L.; Hale, F.V.; Siegel, M.D.

1988-04-01T23:59:59.000Z

169

Appendix B Metric  

Gasoline and Diesel Fuel Update (EIA)

Metric Metric and Thermal Conversion Tables Metric Conversions Table B1 presents Summary Statistics for Natural Gas in the United States for 1992 through 1996 in metric units of measure. Volumes are shown in cubic meters instead of cubic feet. Prices are shown in dollars per thousand cubic meters instead of dollars per thousand cubic feet. The data in this table have been converted from the data that appear in Table 1 of this report. Thermal Conversions Table B2 presents the thermal (Btu) conversion factors and the converted data for natural gas supply and disposition from 1992 through 1996. A brief documentation for the thermal conversion factors follows: * Marketed Production. The conversion factor is calcu- lated by adding the total heat content of dry production to the total heat content of extraction loss and dividing the resulting sum by the total quantity of dry production and extraction

170

Environmental Management Performance Report to DOE-RL December 2000  

SciTech Connect

This section provides an executive level summary of the performance information covered in this report and is intended to bring to Management's attention that information considered to be most noteworthy. All cost, schedule, milestone commitments, performance measures, and safety data is current as of October 31. Accomplishments, Issues and Integration items are current as of November 17 unless otherwise noted. The section begins with a description of notable accomplishments that have occurred since the last report and are considered to have made the greatest contribution toward safe, timely, and cost-effective clean up. Following the accomplishment section is an overall fiscal year-to-date summary analysis addressing cost, schedule, and milestone performance. Overviews of safety ensue. The next segment of the Executive Summary, entitled Critical Issues, is designed to identify the high-level challenges to achieving cleanup progress. The next section includes FY 2001 EM Management Commitment High Visibility Project Milestones and Critical Few Performance Measures. The Key Integration Activities section follows next, highlighting PHMC activities that cross contractor boundaries and demonstrate the shared value of partnering with other Site entities to accomplish the work. Concluding the Executive Summary, a forward-looking synopsis of Upcoming Planned Key Events is provided.

EDER, D.M.

2000-12-01T23:59:59.000Z

171

Federal Energy Management Program: Energy Savings Performance Contract  

NLE Websites -- All DOE Office Websites (Extended Search)

Training Training The Federal Energy Management Program offers training to help Federal agencies implement energy savings performance contracts (ESPCs). Introduction to Alternative Financing for Energy Efficiency and Renewable Energy: Covers the use of project funding tools to plan and implement energy and water saving measures and renewable energy systems in Federal facilities. Recorded June 29, 2010. Introduction to Energy Savings Performance Contracts: Outlines how ESPCs can help Federal agencies implement renewable energy, energy efficiency, and water efficiency projects. Recorded June 30, 2010. Financing and Pricing Evaluation for Energy Savings Performance Contracts: Offers a brief overview of costs and pricing review of the ESPC final proposal and how ESPCs can fund the reduction of Federal facility energy use and costs. Recorded July 7, 2010.

172

Harmonizing Global Metrics for Data Center Efficiency  

NLE Websites -- All DOE Office Websites (Extended Search)

Page 1 Page 1 Harmonizing Global Metrics for Data Center Energy Efficiency Global Taskforce Reaches Agreement on Measurement Protocols for PUE - Continues Discussion of Additional Energy Efficiency Metrics February 28th, 2011 The data center has become an increasingly important part of most business operations in the twenty-first century. With escalating demand and rising energy prices, it is essential for the owners and operators of these mission critical facilities to assess and improve their performance with energy efficiency metrics. However, even with the global presence of many companies, these metrics are often not applied consistently at a global level. To address these inconsistencies, a group of global leaders has been meeting regularly to agree

173

Ideal based cyber security technical metrics for control systems  

Science Conference Proceedings (OSTI)

Much of the world's critical infrastructure is at risk from attack through electronic networks connected to control systems. Security metrics are important because they provide the basis for management decisions that affect the protection of the ... Keywords: control system security, cyber security metrics

Wayne Boyer; Miles McQueen

2007-10-01T23:59:59.000Z

174

Cyber threat metrics.  

SciTech Connect

Threats are generally much easier to list than to describe, and much easier to describe than to measure. As a result, many organizations list threats. Fewer describe them in useful terms, and still fewer measure them in meaningful ways. This is particularly true in the dynamic and nebulous domain of cyber threats - a domain that tends to resist easy measurement and, in some cases, appears to defy any measurement. We believe the problem is tractable. In this report we describe threat metrics and models for characterizing threats consistently and unambiguously. The purpose of this report is to support the Operational Threat Assessment (OTA) phase of risk and vulnerability assessment. To this end, we focus on the task of characterizing cyber threats using consistent threat metrics and models. In particular, we address threat metrics and models for describing malicious cyber threats to US FCEB agencies and systems.

Frye, Jason Neal; Veitch, Cynthia K.; Mateski, Mark Elliot; Michalski, John T.; Harris, James Mark; Trevino, Cassandra M.; Maruoka, Scott

2012-03-01T23:59:59.000Z

175

Knowledge Management Enablers, Processes, and Organizational Performance: An Integrative View and Empirical Examination  

Science Conference Proceedings (OSTI)

Knowledge is recognized as an important weapon for sustaining competitive advantage and many companies are beginning to manage organizational knowledge. Researchers have investigated knowledge management factors such as enablers, processes, and performance. ... Keywords: Knowledge Management, Knowledge Management Enablers, Knowledge-Creating Processes, Organizational Creativity, Organizational Performance

Heeseok Lee; Byounggu Choi

2003-07-01T23:59:59.000Z

176

Approaches To Crisis Prevention In Lean Product Development By High Performance Teams And Through Risk Management  

E-Print Network (OSTI)

This thesis investigates crisis prevention in lean product development, focusing on high performance teams and risk management methods.

Oehmen, Josef

177

Federal Energy Management Program: Energy Savings Performance Contract Case  

NLE Websites -- All DOE Office Websites (Extended Search)

Case Studies Case Studies These case studies feature examples of projects made possible by the use of energy savings performance contracts (ESPCs). Bureau of Land Management (BLM) ESPC across Six States: BLM initiated lighting, HVAC, and other upgrades at remote facilities across six states as part of this successful ESPC. Dyess Air Force Base Water Conservation and Green Energy: Dyess Air Force Base leveraged an ESPC to implement water conservation and wind energy projects. Food and Drug Administration (FDA) White Oak Campus Environmental Stewardship and Cost Savings: The FDA White Oak Campus in Silver Spring, Maryland, receives power from a central utility plant constructed using an ESPC. Harold Washington Social Security Administration (SSA) Center Water Conservation and Green Energy: SSA installed numerous energy conservation measures at its Harold Washington Center in Chicago, Illinois, using an ESPC.

178

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 4 8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

179

Harmonizing Global Metrics for Data Center Energy Efficiency, February 2,  

NLE Websites -- All DOE Office Websites (Extended Search)

Harmonizing Global Metrics for Data Center Energy Efficiency, Harmonizing Global Metrics for Data Center Energy Efficiency, February 2, 2010 Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources

180

Smart Grid Characteristics, Values, and Metrics | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Characteristics, Values, and Metrics Smart Grid Characteristics, Values, and Metrics DOE Smart Grid Implementation Worksho Smart Grid Characteristics, Values, and Metrics More...

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Implementing the Data Center Energy Productivity Metric  

SciTech Connect

As data centers proliferate in both size and number, their energy efficiency is becoming increasingly important. We discuss the properties of a number of the proposed metrics of energy efficiency and productivity. In particular, we focus on the Data Center Energy Productivity (DCeP) metric, which is the ratio of useful work produced by the data center to the energy consumed performing that work. We describe our approach for using DCeP as the principal outcome of a designed experiment using a highly instrumented, high performance computing data center. We found that DCeP was successful in clearly distinguishing between different operational states in the data center, thereby validating its utility as a metric for identifying configurations of hardware and software that would improve (or even maximize) energy productivity. We also discuss some of the challenges and benefits associated with implementing the DCeP metric, and we examine the efficacy of the metric in making comparisons within a data center and among data centers.

Sego, Landon H.; Marquez, Andres; Rawson, Andrew; Cader, Tahir; Fox, Kevin M.; Gustafson, William I.; Mundy, Christopher J.

2012-10-01T23:59:59.000Z

182

Metric Properties of Euclidean Buildings  

E-Print Network (OSTI)

This is a survey on nondiscrete euclidean buildings, with a focus on metric properties of these spaces.

Kramer, Linus

2010-01-01T23:59:59.000Z

183

On Multi-Metric Spaces  

E-Print Network (OSTI)

A Smarandache multi-space is a union of $n$ spaces $A_1,A_2,..., A_n$ with some additional conditions holding. Combining Smarandache multi-spaces with classical metric spaces, the conception of multi-metric space is introduced. Some characteristics of a multi-metric space are obtained and Banach's fixed-point theorem is generalized in this paper.

Linfan Mao

2005-10-22T23:59:59.000Z

184

Metrics And The Software Designer  

E-Print Network (OSTI)

This paper will focus on these key topics in an effort to propose a means by which software designers can become effective contributors in the process of metrics collection analysis and reporting. METRICS AND THE SOFTWARE DESIGNER 4 2. KEY TOPICS FOR METRICS USAGE BY DESIGNERS

John T. Kalisz

1996-01-01T23:59:59.000Z

185

Parallel application-level behavioral attributes for performance and energy management of high-performance computing systems  

Science Conference Proceedings (OSTI)

Run time variability of parallel applications continues to present significant challenges to their performance and energy efficiency in high-performance computing (HPC) systems. When run times are extended and unpredictable, application developers perceive ... Keywords: Performance and energy management, Performance measurement, Run time attributes

Jeffrey J. Evans; Charles E. Lucas

2013-03-01T23:59:59.000Z

186

Metric adjusted skew information  

E-Print Network (OSTI)

We extend the concept of Wigner-Yanase-Dyson skew information to something we call ``metric adjusted skew information'' (of a state with respect to a conserved observable). This ``skew information'' is intended to be a non-negative quantity bounded by the variance (of an observable in a state) that vanishes for observables commuting with the state. We show that the skew information is a convex function on the manifold of states. It also satisfies other requirements, proposed by Wigner and Yanase, for an effective measure-of-information content of a state relative to a conserved observable. We establish a connection between the geometrical formulation of quantum statistics as proposed by Chentsov and Morozova and measures of quantum information as introduced by Wigner and Yanase and extended in this article. We show that the set of normalized Morozova-Chentsov functions describing the possible quantum statistics is a Bauer simplex and determine its extreme points. We determine a particularly simple skew information, the ``lambda-skew information,'' parametrized by a lambda in (0,1], and show that the convex cone this family generates coincides with the set of all metric adjusted skew informations. Key words: Skew information, convexity, monotone metric, Morozova-Chentsov function, lambda-skew information.

Frank Hansen

2006-07-23T23:59:59.000Z

187

An elusive antecedent of superior firm performance: The knowledge management factor  

Science Conference Proceedings (OSTI)

Knowledge management (KM) concepts, principles, and technologies provide a foundation for understanding and building systems for acquiring, assimilating, selecting, generating, and emitting knowledge-a crucial resource of the firm. In the knowledge management ... Keywords: COMPUSTAT, Financial performance, Firm performance, KM, Knowledge management, Resource-based theory

Clyde W. Holsapple; Jiming Wu

2011-12-01T23:59:59.000Z

188

Measurable Control System Security through Ideal Driven Technical Metrics  

Science Conference Proceedings (OSTI)

The Department of Homeland Security National Cyber Security Division supported development of a small set of security ideals as a framework to establish measurable control systems security. Based on these ideals, a draft set of proposed technical metrics was developed to allow control systems owner-operators to track improvements or degradations in their individual control systems security posture. The technical metrics development effort included review and evaluation of over thirty metrics-related documents. On the bases of complexity, ambiguity, or misleading and distorting effects the metrics identified during the reviews were determined to be weaker than necessary to aid defense against the myriad threats posed by cyber-terrorism to human safety, as well as to economic prosperity. Using the results of our metrics review and the set of security ideals as a starting point for metrics development, we identified thirteen potential technical metrics - with at least one metric supporting each ideal. Two case study applications of the ideals and thirteen metrics to control systems were then performed to establish potential difficulties in applying both the ideals and the metrics. The case studies resulted in no changes to the ideals, and only a few deletions and refinements to the thirteen potential metrics. This led to a final proposed set of ten core technical metrics. To further validate the security ideals, the modifications made to the original thirteen potential metrics, and the final proposed set of ten core metrics, seven separate control systems security assessments performed over the past three years were reviewed for findings and recommended mitigations. These findings and mitigations were then mapped to the security ideals and metrics to assess gaps in their coverage. The mappings indicated that there are no gaps in the security ideals and that the ten core technical metrics provide significant coverage of standard security issues with 87% coverage. Based on the two case studies and evaluation of the seven assessments, the security ideals demonstrated their value in guiding security thinking. Further, the final set of core technical metrics has been demonstrated to be both usable in the control system environment and provide significant coverage of standard security issues.

Miles McQueen; Wayne Boyer; Sean McBride; Marie Farrar; Zachary Tudor

2008-01-01T23:59:59.000Z

189

Clean Cities 2011 Annual Metrics Report  

DOE Green Energy (OSTI)

This report details the petroleum savings and vehicle emissions reductions achieved by the U.S. Department of Energy's Clean Cities program in 2011. The report also details other performance metrics, including the number of stakeholders in Clean Cities coalitions, outreach activities by coalitions and national laboratories, and alternative fuel vehicles deployed.

Johnson, C.

2012-12-01T23:59:59.000Z

190

Clean Cities 2010 Annual Metrics Report  

DOE Green Energy (OSTI)

This report details the petroleum savings and vehicle emissions reductions achieved by the U.S. Department of Energy's Clean Cities program in 2010. The report also details other performance metrics, including the number of stakeholders in Clean Cities coalitions, outreach activities by coalitions and national laboratories, and alternative fuel vehicles deployed.

Johnson, C.

2012-10-01T23:59:59.000Z

191

Dynamic Thermal Management for High-Performance Storage Systems  

Science Conference Proceedings (OSTI)

Thermal-aware design of disk drives is important because high temperatures can cause reliability problems. Dynamic Thermal Management (DTM) techniques have been proposed to operate the disk at the average case temperature, rather than at the worse case by modulating the activities to avoid thermal emergencies. The thermal emergencies can be caused by unexpected events, such as fan-breaks, increased inlet air temperature, etc. One of the DTM techniques is a delay-based approach that adjusts the disk seek activities, cooling down the disk drives. Even if such a DTM approach could overcome thermal emergencies without stopping disk activity, it suffers from long delays when servicing the requests. Thus, in this chapter, we investigate the possibility of using a multispeed disk-drive (called dynamic rotations per minute (DRPM)) that dynamically modulates the rotational speed of the platter for implementing the DTM technique. Using a detailed performance and thermal simulator of a storage system, we evaluate two possible DTM policies (- time-based and watermark-based) with a DRPM disk-drive and observe that dynamic RPM modulation is effective in avoiding thermal emergencies. However, we find that the time taken to transition between different rotational speeds of the disk is critical for the effectiveness of the DRPM based DTM techniques.

Kim, Youngjae [ORNL; Gurumurthi, Dr Sudhanva [University of Virginia; Sivasubramaniam, Anand [Pennsylvania State University

2012-01-01T23:59:59.000Z

192

Performance Analysis of a Flash-Crowd Management System  

E-Print Network (OSTI)

Dr. Guillaume PierreFlash-crowds are a growing obstacle to the further expansion of the Internet. One of the solutions to this problem is to replicate the most popular documents to different web servers and to redirect client requests to these replicas. In this thesis we present a performance analysis of a flash-crowd management system based on RaDaR. We adjust the architecture of RaDaR to focus more on adaptability rather than scalability, to give the system a better chance against a flash-crowd by using algorithms from another system by the same authors, ACDN. Because existing benchmarks do not show realistic behavior, we first propose our own synthetic benchmark. Finally we use the benchmark tool to replay requests from a trace of an actual flash-crowd. Our results are three-fold: first we show how to dimension a RaDaR-like system. Second, we demonstrate based on a synthetic benchmark as well as a trace-based benchmark that the RaDaR-like system adjusts to a flash-crowd in a timely and efficient fashion. Finally, we identify an inherent instability in the replica placement

Reinoud Esser

2006-01-01T23:59:59.000Z

193

Integrated Substation Equipment Risk and Performance Assessment Tool for Asset Management and Smart Grid Implementation  

Science Conference Proceedings (OSTI)

Risk assessment and risk management are key elements in any well-developed asset management plan, and an increasing number of utility managers are devoting resources to improving their ability to understand and make risk-based decisions. Consequently, there is growing interest in the tools and methodologies required to better assess equipment performance and risk and provide quantitative information to drive asset management decision processes. In addition, risk and performance assessment tools can be in...

2009-12-23T23:59:59.000Z

194

U.S. Department of Energy Supervisory/Non-supervisory Employee Performance Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory/Non-supervisory Supervisory/Non-supervisory Employee Performance Management and Recognition Program Desk Reference U.S. Department of Energy Office of the Chief Human Capital Officer October 1, 2010 2 Table of Contents Introduction .................................................................................................................................................. 4 DOE Performance Management Process ..................................................................................................... 5 PHASE I - Planning Performance ............................................................................................................... 5 Setting Goals and Measures ...................................................................................................................... 8

195

DOE O 331.1C Admin Chg 2, Employee Performance Management and Recognition Program  

Directives, Delegations, and Requirements

To establish requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees at grades GS-15 and ...

2010-10-15T23:59:59.000Z

196

Asset Management Toolkit Modules: An Approach for Risk-Informed Performance-Focused Asset Management in the Power Delivery Industry  

Science Conference Proceedings (OSTI)

With the growing emphasis on risk management, decision makers need both quantified estimates of the risk/uncertainty and actionable results for capital and operation and maintenance (O&M) investments in power delivery projects. This report describes the concepts and modular automation framework for an asset management toolkit that embodies the methods and processes of risk-informed, performance-focused asset management in the power delivery industry.

2005-06-30T23:59:59.000Z

197

Office of Legacy Management Designated as a High-Performing Organization |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Legacy Management Designated as a High-Performing Office of Legacy Management Designated as a High-Performing Organization Office of Legacy Management Designated as a High-Performing Organization July 6, 2009 - 11:45am Addthis Office of Legacy Management Designated as a High-Performing Organization What does this project do? Goal 5. Sustain management excellence Executive Summary: The U.S. Department of Energy (DOE) Office of Legacy Management (LM) was established in 2003 to serve as the steward for the nation's Cold War nuclear legacy. LM is responsible for the long-term surveillance and maintenance of environmental remedies, promotion of beneficial reuse, and management of records and information associated with over 70 former nuclear weapons production sites located in 26 states. LM is also responsible for the administration of contractor pension plans and

198

WebMetrics: Technical Overview  

Science Conference Proceedings (OSTI)

VUG Home Page NIST Web Metrics Technical Overview. Technical Overview. NIST Logo. Good usability is critical to the success of a website. ...

199

Thermodynamic Metrics and Optimal Paths  

E-Print Network (OSTI)

Thermodynamic metrics and optimal paths David A. Sivak ? andmanifold on the space of thermodynamic states. Within theconnection to the existing thermodynamic length formalism,

Sivak, David

2013-01-01T23:59:59.000Z

200

Performance of multiple cabin optimization methods in airline revenue management  

E-Print Network (OSTI)

Although many airlines offer seats in multiple cabins (economy vs. premium classes) with different service quality, previous work on airline revenue management has focused on treating the cabins separately. In this thesis, ...

Lepage, Pierre-Olivier

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Environmental Management Root Cause Analysis Corrective Action Plan Performance  

Energy.gov (U.S. Department of Energy (DOE))

As part of the Department’s effort to build a strong project and contract management foundation, a Root Cause Analysis (RCA) was developed through extensive collaboration between DOE's Headquarters...

202

VOC Exposure Metrics  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 VOC Exposure Metrics ... and "Sick Building Syndrome" Figure1: The elevated odds ratios (above unity) in this figure suggest that exposures to VOCs from water-based points and solvents are associated with a variety of sick building symptions (* indicates the OR is significant at p < 0.05; ** for p < 0.01). The indoors is often regarded as safe haven from problems associated with outdoor air pollution, but a growing number of reports have suggested that exposures in indoor environments may lead to health problems. One area in which evidence has been accumulating is the relationship between working in office buildings (as opposed to industrial exposure conditions) and a variety of health effects, such as eye, nose, and throat irritation and

203

Metrics and Benchmarks for Energy Efficiency in Laboratories  

E-Print Network (OSTI)

energy efficiency metrics and benchmarks for laboratories, at the whole buildingBuilding Site Energy BTU/sf-yr). A performance Benchmark isBenchmarks Good Practice ID Building B1 Name Unit Building Site Energy

Mathew, Paul

2007-01-01T23:59:59.000Z

204

Performing Energy Security Assessments - A How-To Guide for Federal Facility Managers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Performing Energy Security Assessments - Performing Energy Security Assessments - A How-To Guide for Federal Facility Managers ii Contents EXECUTIVE SUMMARY ........................................................................................................ v 1. INTRODUCTION ............................................................................................................... 1 1.1 Facilities to be Assessed...........................................................................................................................1 2. BEGINNING THE ENERGY SECURITY ASSESSMENT PROCESS ............................... 2 2.1 Assign an Energy Security Manager .........................................................................................................2 2.2 Define the Mission of the Installation

205

Performing Energy Security Assessments - A How-To Guide for Federal Facility Managers  

NLE Websites -- All DOE Office Websites (Extended Search)

Performing Energy Security Assessments - Performing Energy Security Assessments - A How-To Guide for Federal Facility Managers ii Contents EXECUTIVE SUMMARY ........................................................................................................ v 1. INTRODUCTION ............................................................................................................... 1 1.1 Facilities to be Assessed...........................................................................................................................1 2. BEGINNING THE ENERGY SECURITY ASSESSMENT PROCESS ............................... 2 2.1 Assign an Energy Security Manager .........................................................................................................2 2.2 Define the Mission of the Installation

206

U-137: HP Performance Manager Unspecified Bug Lets Remote Users Execute  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: HP Performance Manager Unspecified Bug Lets Remote Users 7: HP Performance Manager Unspecified Bug Lets Remote Users Execute Arbitrary Codes U-137: HP Performance Manager Unspecified Bug Lets Remote Users Execute Arbitrary Codes March 30, 2012 - 9:15am Addthis PROBLEM: HP Performance Manager Unspecified Bug Lets Remote Users Execute Arbitrary Codes PLATFORM: HP-UX B.11.31 HP-UX B.11.23 ABSTRACT: A remote user can execute arbitrary code on the target system. REFERENCE LINKS: HP Support Document ID: c03255321 SecurityTracker Alert ID: 1026869 CVE-2012-0127 IMPACT ASSESSMENT: High Discussion: A potential security vulnerability has been identified with HP Performance Manager running on HP-UX, Linux, Solaris, and Windows. The vulnerability could be exploited remotely to execute arbitrary code and to create a Denial of Service (DoS).

207

Office of Legacy Management Designated as a High-Performing Organization |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Legacy Management Designated as a High-Performing Office of Legacy Management Designated as a High-Performing Organization Office of Legacy Management Designated as a High-Performing Organization July 6, 2009 - 11:45am Addthis What does this project do? Goal 5. Sustain management excellence Executive Summary: The U.S. Department of Energy (DOE) Office of Legacy Management (LM) was established in 2003 to serve as the steward for the nation's Cold War nuclear legacy. LM is responsible for the long-term surveillance and maintenance of environmental remedies, promotion of beneficial reuse, and management of records and information associated with over 70 former nuclear weapons production sites located in 26 states. LM is also responsible for the administration of contractor pension plans and post-retirement benefits for over 10,000 former contractor workers.

208

Kinship: efficient resource management for performance and functionally asymmetric platforms  

Science Conference Proceedings (OSTI)

On-chip heterogeneity has become key to balancing performance and power constraints, resulting in disparate (functionally overlapping but not equivalent) cores on a single die. Requiring developers to deal with such heterogeneity can impede adoption ... Keywords: dynamic scheduling, functional asymmetry, kinship, performance asymmetry

Vishakha Gupta; Rob Knauerhase; Paul Brett; Karsten Schwan

2013-05-01T23:59:59.000Z

209

Optimising waste management performance - The key to successful decommissioning  

SciTech Connect

Available in abstract form only. Full text of publication follows: On the 1. of April 2005 the United Kingdom's Nuclear Decommissioning Authority became responsible for the enormous task of decommissioning the UK's civilian nuclear liabilities. The success of the NDA in delivering its key objectives of safer, cheaper and faster decommissioning depends on a wide range factors. It is self-evident, however, that the development of robust waste management practices by those charged with decommissioning liability will be at the heart of the NDA's business. In addition, the implementation of rigorous waste minimisation techniques throughout decommissioning will deliver tangible environmental benefits as well as better value for money and release funds to accelerate the decommissioning program. There are mixed views as to whether waste minimisation can be achieved during decommissioning. There are those that argue that the radioactive inventory already exists, that the amount of radioactivity cannot be minimised and that the focus of activities should be focused on waste management rather than waste minimisation. Others argue that the management and decommissioning of the UK's civilian nuclear liability will generate significant volumes of additional radioactive waste and it is in this area where the opportunities for waste minimisation can be realised. (author)

Keep, Matthew [Entec UK Limited. 17 Angel Gate. City Road. London EC1V 2SH (United Kingdom)

2007-07-01T23:59:59.000Z

210

Cleanroom Energy Efficiency: Metrics and Benchmarks  

E-Print Network (OSTI)

The key metrics and benchmarks to evaluate the efficiency ofEfficiency: Metrics and Benchmarks Paul A. Mathew, WilliamEfficiency: Metrics and Benchmarks Paul A. Mathew, Ph.D,

Mathew, Paul A.

2012-01-01T23:59:59.000Z

211

Effectiveness of various error metrics in SCEPTRE.  

Science Conference Proceedings (OSTI)

The objective of this project is to investigate accuracy of error metrics in SCEPTRE and produce useful benchmarks, identify metrics that do not work well, identify metrics that do work well, and produce easy to reference results.

Olson, Aaron

2010-08-01T23:59:59.000Z

212

Experimental comparison of software metrics (abstract only)  

Science Conference Proceedings (OSTI)

Software complexity metrics attempt to objectively measure the difficulty involved in creating and maintaining a program. This experiment will compare five complexity metrics as measures for reading comprehension of programs. The metrics compared are ...

Beth Clark

1985-03-01T23:59:59.000Z

213

Function points as a universal software metric  

Science Conference Proceedings (OSTI)

Function point metrics are the most accurate and effective metrics yet developed for software sizing and also for studying software productivity, quality, costs, risks, and economic value. Unlike the older "lines of code" metric function points can be ...

Capers Jones

2013-07-01T23:59:59.000Z

214

Key Performance Indicator Effectiveness  

Science Conference Proceedings (OSTI)

... Outcome: OMAC Standardized Working-Steps for CNC Milling Machines; Output: Reference document describing performance metrics and ...

2013-01-04T23:59:59.000Z

215

Defining a Standard Metric for Electricity Savings  

NLE Websites -- All DOE Office Websites (Extended Search)

Defining a Standard Metric for Electricity Savings Title Defining a Standard Metric for Electricity Savings Publication Type Report LBNL Report Number LBNL-2213E Year of...

216

Dynamic tracking of page miss ratio curve for memory management  

Science Conference Proceedings (OSTI)

Memory can be efficiently utilized if the dynamic memory demands of applications can be determined and analyzed at run-time. The page miss ratio curve(MRC), i.e. page miss rate vs. memory size curve, is a good performance-directed metric to serve this ... Keywords: memory management, power management, resource allocation

Pin Zhou; Vivek Pandey; Jagadeesan Sundaresan; Anand Raghuraman; Yuanyuan Zhou; Sanjeev Kumar

2004-12-01T23:59:59.000Z

217

Conversion to the Metric System  

U.S. Energy Information Administration (EIA)

Appendix C Conversion to the Metric System Public Law 100–418, the Omnibus Trade and Competitiveness Act of 1988, states: “It is the declared policy of the United ...

218

Segmental alternations and metrical theory  

E-Print Network (OSTI)

This dissertation focuses on phonological alternations that are influenced or constrained by word-internal prosody, i.e. prominence and foot structure, and what these alternations can tell us about metrical theory. Detailed ...

Vaysman, Olga

2009-01-01T23:59:59.000Z

219

Performance Metrics for Intelligent Systems Workshop  

Science Conference Proceedings (OSTI)

... Regular Registration: $375 (includes coffee breaks and lunch each day and Banquet on September 22nd.) Student Registration: $250 (includes ...

2012-08-21T23:59:59.000Z

220

PERFORMANCE METRICS INTELLIGENT SYSTEMS (PerMIS ...  

Science Conference Proceedings (OSTI)

... (18:30 – 22:00) Banquet (Dinner Cruis e ) Page 10. ... 15:30 WED-PM Co-X Panel Discussion 18:30 Banquet Dinner Cruise PROGRAM PERMIS ...

2012-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Virtualized application performance prediction using system metrics  

E-Print Network (OSTI)

Virtualized datacenter administrators would like to consolidate virtual machines (VMs) onto as few physical hosts as possible in order to decrease costs, but must leave enough physical resources for each VM to meet application ...

Wanderman-Milne, Skye A

2012-01-01T23:59:59.000Z

222

Intelligent Systems Division - Performance Metrics and Test ...  

Science Conference Proceedings (OSTI)

... Location: Amari Orchid Hotel, Bangkok-Pattaya, Thailand. ... Thailand Rescue Robot Championship 2010. Host: Mahidol University, Thailand. Location ...

2011-03-10T23:59:59.000Z

223

Intelligent Systems Division - Performance Metrics and Test ...  

Science Conference Proceedings (OSTI)

... 2009 International Workshop on Urban Search and Rescue Robotics. Location: Bangkok-Pattaya, Thailand. Dates: December 11-14 , 2009, Website ...

2011-03-10T23:59:59.000Z

224

Understanding environmental performance variation in manufacturing companies  

E-Print Network (OSTI)

for effective performance management systems. With the absence of triple-bottom line sustainability measures in business bonus schemes, it may be hard to drive sustainability performance improvement. Finding 2: Measuring environmental and social impact... systems there are challenges: how can means be developed to measure and manage effects that are not fully understood yet (e.g. rebound effect, social impacts) and how to balance between metrics? Currently, company strategy and vision serve as a guideline...

Bocken, Nancy

2013-01-01T23:59:59.000Z

225

Managing Risk and Improving Financial Performance for an Aging Turbo-Generator Fleet  

Science Conference Proceedings (OSTI)

This document is a brief guide for maintenance staff on effectively using the PowerPoint slideshow, A Proposal to Better Manage Risk and Improve Financial Performance of an Aging Turbo-Generator Fleet, as a starting point for discussing the issue with plant management.

2008-11-03T23:59:59.000Z

226

Extend the value and reach of your software with performance management The IBM Cognos OEM Program  

E-Print Network (OSTI)

foundation that is: Complete. All business intelligence and planning components on a single, robust business intelligence (BI) and performance management solutions deliver world- leading enterprise planning or registered trademarks of International Business Machines Corporation in the United States, other countries

227

Managing the 802.11 Energy/Performance Tradeoff with Machine Learning  

E-Print Network (OSTI)

This paper addresses the problem of managing the tradeoff betweenenergy consumption and performance in wireless devices implementingthe IEEE 802.11 standard. To save energy, the 802.11 specificationproposes a power-saving ...

Monteleoni, Claire

2004-10-27T23:59:59.000Z

228

Quality Assurance Strategy for Existing Homes: Final Quality Management Primer for High Performing Homes  

SciTech Connect

This guide is designed to help Building America (BA) Teams understand quality management and its role in transitioning from conventional to high performance home building and remodeling. It explains what quality means, the value of quality management systems, the unique need for QMS when building high performing homes, and the first steps to a implementing a comprehensive QMS. This document provides a framework and context for BA teams when they encounter builders and remodelers.

Del Bianco, M.; Taggart, J.; Sikora, J.; Wood, A.

2012-12-01T23:59:59.000Z

229

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

230

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 71% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

231

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

232

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 79% Line Item 71% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

233

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

234

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

235

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual FY 2011 Pre- & Post-CAP Actual Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 77% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

236

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 69% Line Item 67% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

237

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target 1st Qtr FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

238

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

239

Risk Management Tool Attributes:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Tools & SMEs - Tools & SMEs Outline for Breakout Session TOOLS 1. Types of Tools a. Risk Management - Database & Reports, risk register, risk forms, risk tracking & monitoring, basis of estimate, action item tracking, historical record of risks & changes, configuration control, enterprise-wide, metrics, risk performance index, risk checklist, graphical display, management reporting (various levels), risk communications b. Risk Analysis i. Cost, ii. budgets, funding, cash-flow analysis, iii. Schedule iv. tailoring categories v. Integrated Cost & Schedule vi. Project phase analysis; organization ownership & joint planning c. Risk Knowledge and Lessons Learned Database i. Enterprise-wide ii. Job/owner-specific iii. Workshops - project specific, risk management,

240

Using performance parameters, metrified performance objectives, and quality management assessments to improve the effectiveness of research organizations  

Science Conference Proceedings (OSTI)

This paper begins by raising the issue of whether the theoretical model of customer-suppliers-products-services usefully describes the activities of laboratory life, using a case study from Fermilab. After describing scientific activities as work, not volunteerism, I present a model that has four performance parameters that can be used to evaluate DOE-funded research laboratories: (1) Do they have a well-defined management system? (2) Are they doing good science? (3) Are they managing their resources effectively? (4) Are they responsive to their customers? From these four parameters I describe how to metrify performance objectives, then use them to evaluate research organizations. I describe these performance objectives within the context of views I have published elsewhere, and according to Stephen R. Covey`s metaphor of production/production capability (P/PC) balance in his book The 7 Habits of Highly Effective People.

Bodnarczuk, M.

1995-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Metric spaces with unique pretangent spaces  

E-Print Network (OSTI)

We find necessary and sufficient conditions under which an arbitrary metric space $X$ has a unique pretangent space at the marked point $a\\in X$. Key words: Metric spaces; Tangent spaces to metric spaces; Uniqueness of tangent metric spaces; Tangent space to the Cantor set.

Dovgoshey, Oleksiy; Kugukaslan, Mehmet

2009-01-01T23:59:59.000Z

242

Security metrics for source code structures  

Science Conference Proceedings (OSTI)

Software security metrics are measurements to assess security related imperfections (or perfections) introduced during software development. A number of security metrics have been proposed. However, all the perspectives of a software system have not ... Keywords: code quality and security., metrics, security metrics

Istehad Chowdhury; Brian Chan; Mohammad Zulkernine

2008-05-01T23:59:59.000Z

243

Federal Energy Management Program: Energy Savings Performance Contracts  

NLE Websites -- All DOE Office Websites (Extended Search)

Contracts Contracts Getting Started Federal agencies new to the ESPC process should review the ESPC Overview, the FEMP Assistance Guide, and the FAQs. Case studies are also available. When you are ready to get started, contact a FEMP financing specialist. Energy savings performance contracts (ESPCs) allow Federal agencies to complete energy-savings projects without up-front capital costs and special Congressional appropriations. An ESPC is a partnership between a Federal agency and an energy service company (ESCO). The ESCO conducts a comprehensive energy audit of Federal facilities and identifies improvements to save energy. In consultation with the Federal agency, the ESCO designs and constructs a project that meets the agency's needs and arranges the necessary funding. The ESCO guarantees that the improvements will generate energy cost savings to pay for the project over the term of the contract (up to 25 years). After the contract ends, all additional cost savings accrue to the agency.

244

Property:OpenEI/CETSI/Metrics | Open Energy Information  

Open Energy Info (EERE)

Metrics Metrics Jump to: navigation, search Property Name OpenEI/CETSI/Metrics Property Type Text Description Environmental aspects and performance metrics associated with the resource. Pages using the property "OpenEI/CETSI/Metrics" Showing 25 pages using this property. (previous 25) (next 25) A An Overview of Existing Wind Energy Ordinances + The objective of these communities is to facilitate and regulate the development of Wind Energy Conversion Systems. Animal Farm Powers Village + The plant will produce 350 kilowatts per hour, "enough to supply 175 homes with electricity). C City of Aspen Climate Action Plan + The Climate Action Plan calls for greenhouse gas reductions of 30 percent by 2020 and 80 percent by 2050 from its 2004 baseline. Performance metrics are quantified by tons of CO2-e reduced. Based on a 2007 update to the baseline emissions inventory, the community achieved emissions reductions of 68,380 tons. The energy and environmental achievements as of the Plan's adoption in 2007 are outlined as updates within the Plan. To date, there has been no progress report on the Climate Action Plan per se, however the City's environmental achievements are described in the biennial Sustainability Report available at: http://www.aspenpitkin.com/Portals/0/docs/City/GreenInitiatives/enviro_sustainability_report_2008.pdf

245

data center energy sustainability metric  

E-Print Network (OSTI)

Data centers represent an increasingly popular construction project type, supported by the continued growth in internet-based services. These facilities can, however, consume large amounts of electricity and—especially if growth trends continue—put strain on utility grids and energy resources. Many metrics have been proposed to evaluate and communicate energy use in data centers. In many cases, the goal is that these metrics will be used to develop energy conscious behavior and perhaps data center sustainability ratings or building codes to reduce average energy use. In this paper, we examine one of the more popular metrics, Power Usage Effectiveness (PUE), and discuss its shortcomings toward effectively communicating energy sustainability. Our inference is that PUE is an instantaneous representation of electrical energy consumption that encourages operators to report the minimum observed values of PUE. Hence, PUE only conveys an understanding of the minimum possible energy use. Instead we propose the use of energy-based metrics or average PUE over a significant time period—e.g., a year—to better understand the energy efficiency of a data center and to develop sustainability rating/ranking systems and energy codes. Keywords-Data centers; energy efficiency metrics; sustainability standards; Power Usage Effectiveness

Jumie Yuventi; Roshan Mehdizadeh; Jumie Yuventi; Roshan Mehdizadeh

2013-01-01T23:59:59.000Z

246

A model for evaluating the social performance of construction waste management  

SciTech Connect

Highlights: Black-Right-Pointing-Pointer Scant attention is paid to social performance of construction waste management (CWM). Black-Right-Pointing-Pointer We develop a model for assessing the social performance of CWM. Black-Right-Pointing-Pointer With the model, the social performance of CWM can be quantitatively simulated. - Abstract: It has been determined by existing literature that a lot of research efforts have been made to the economic performance of construction waste management (CWM), but less attention is paid to investigation of the social performance of CWM. This study therefore attempts to develop a model for quantitatively evaluating the social performance of CWM by using a system dynamics (SD) approach. Firstly, major variables affecting the social performance of CWM are identified and a holistic system for assessing the social performance of CWM is formulated in line with feedback relationships underlying these variables. The developed system is then converted into a SD model through the software iThink. An empirical case study is finally conducted to demonstrate application of the model. Results of model validation indicate that the model is robust and reasonable to reflect the situation of the real system under study. Findings of the case study offer helpful insights into effectively promoting the social performance of CWM of the project investigated. Furthermore, the model exhibits great potential to function as an experimental platform for dynamically evaluating effects of management measures on improving the social performance of CWM of construction projects.

Yuan Hongping, E-mail: hpyuan2005@gmail.com [School of Economics and Management, Southwest Jiaotong University, Chengdu 610031 (China)

2012-06-15T23:59:59.000Z

247

Interpreting the C-metric  

E-Print Network (OSTI)

The basic properties of the C-metric are well known. It describes a pair of causally separated black holes which accelerate in opposite directions under the action of forces represented by conical singularities. However, these properties can be demonstrated much more transparently by making use of recently developed coordinate systems for which the metric functions have a simple factor structure. These enable us to obtain explicit Kruskal-Szekeres-type extensions through the horizons and construct two-dimensional conformal Penrose diagrams. We then combine these into a three-dimensional picture which illustrates the global causal structure of the space-time outside the black hole horizons. Using both the weak field limit and some invariant quantities, we give a direct physical interpretation of the parameters which appear in the new form of the metric. For completeness, relations to other familiar coordinate systems are also discussed.

J. B. Griffiths; P. Krtous; J. Podolsky

2006-09-15T23:59:59.000Z

248

Moisture Metrics Project  

Science Conference Proceedings (OSTI)

the goal of this project was to determine the optimum moisture levels for biomass processing for pellets commercially, by correlating data taken from numerous points in the process, and across several different feedstock materials produced and harvested using a variety of different management practices. This was to be done by correlating energy consumption and material through put rates with the moisture content of incoming biomass ( corn & wheat stubble, native grasses, weeds, & grass straws), and the quality of the final pellet product.This project disseminated the data through a public website, and answering questions form universities across Missouri that are engaged in biomass conversion technologies. Student interns from a local university were employed to help collect data, which enabled them to learn firsthand about biomass processing.

Schuchmann, Mark

2011-08-31T23:59:59.000Z

249

Harmonizing Global Metrics for Data Center Energy Efficiency (February 2, 2010)  

NLE Websites -- All DOE Office Websites (Extended Search)

Harmonizing Global Metrics for Data Center Energy Efficiency Harmonizing Global Metrics for Data Center Energy Efficiency The United States of America, European Union and Japan Reach Agreement on Guiding Principles for Data Center Energy Efficiency Metrics February 2, 2010 As business demands and energy costs for data centers rise, owners and operators have focused on the energy efficiency of the data center as a whole, frequently using energy efficiency metrics. However, the metrics are not always applied clearly and consistently at a global level. To address these inconsistencies, a group of global leaders met on February 2, 2010 to agree on data center energy efficiency measurements, metrics, and reporting conventions. Organizations represented were the U.S. Department of Energy's Save Now and Federal Energy Management Programs,

250

Conceptual Soundness, Metric Development, Benchmarking, and Targeting for PATH Subprogram Evaluation  

Science Conference Proceedings (OSTI)

The objective of this study is to evaluate the conceptual soundness of the U.S. Department of Housing and Urban Development (HUD) Partnership for Advancing Technology in Housing (PATH) program's revised goals and establish and apply a framework to identify and recommend metrics that are the most useful for measuring PATH's progress. This report provides an evaluative review of PATH's revised goals, outlines a structured method for identifying and selecting metrics, proposes metrics and benchmarks for a sampling of individual PATH programs, and discusses other metrics that potentially could be developed that may add value to the evaluation process. The framework and individual program metrics can be used for ongoing management improvement efforts and to inform broader program-level metrics for government reporting requirements.

Mosey. G.; Doris, E.; Coggeshall, C.; Antes, M.; Ruch, J.; Mortensen, J.

2009-01-01T23:59:59.000Z

251

Metrics on unitary matrices and their application to quantifying the degree of non-commutativity between unitary matrices  

Science Conference Proceedings (OSTI)

By studying the minimum resources required to perform a unitary transformation, families of metrics and pseudo-metrics on unitary matrices that are closely related to a recently reported quantum speed limit by the author are found. Interestingly, this ... Keywords: eigenvalue perturbation theory, measurement of non-commutativity, metrics for unitary matrices, quantum information processing

H. F. Chau

2011-09-01T23:59:59.000Z

252

Measuring the Effect of Management on Performance: A Modern Biblical Paradigm  

Science Conference Proceedings (OSTI)

The ability to measure the effect of management on performance enables higher management and regulators to prescribe measures to ensure that actual management practices are compatible with results important to stakeholders. The principal stakeholders of higher management are the owners, and the principal stakeholders of the regulators are the public. Extended shutdowns and confirmatory action letters over the past decade or so at Cook, Millstone, Zion, Haddam Neck, Clinton, South Texas, Calvert Cliffs, Pilgrim, and other stations strongly suggest that neither higher management nor regulators have a firm grasp of the measurement of the effect of management on performance. Efforts in the past have focused on attributes of effective management rather than data. For example, the U.S. Nuclear Regulatory Commission uses Appendix B, and the Institute of Nuclear Power Operations uses its ''Excellence in Human Performance'' among other guidance. In both cases, assessment focuses on the observation of what is going on in an organization and comparing it with the criteria. In this paper, the emphasis is on data, not attributes. The data of concern here are results (consequences, events, precursors). The biblical paradigm is that a good tree bears good fruit. It does not take a botanist to tell that the apples are firm and tasty. ''Not everything that counts can be counted, and not everything that can be counted counts'' is a popular defense of attribute-driven assessment. The validity of attribute-driven assessment is not disputed, but this paper explores data-driven assessment that is becoming more practical as information technology advances rapidly. This paper does not address a complete management effect measurement system but only explores one aspect of such a system. The aspect chosen is regulatory violation performance.

Corcoran, W.R.

1999-11-14T23:59:59.000Z

253

Measures of agreement between computation and experiment:validation metrics.  

SciTech Connect

With the increasing role of computational modeling in engineering design, performance estimation, and safety assessment, improved methods are needed for comparing computational results and experimental measurements. Traditional methods of graphically comparing computational and experimental results, though valuable, are essentially qualitative. Computable measures are needed that can quantitatively compare computational and experimental results over a range of input, or control, variables and sharpen assessment of computational accuracy. This type of measure has been recently referred to as a validation metric. We discuss various features that we believe should be incorporated in a validation metric and also features that should be excluded. We develop a new validation metric that is based on the statistical concept of confidence intervals. Using this fundamental concept, we construct two specific metrics: one that requires interpolation of experimental data and one that requires regression (curve fitting) of experimental data. We apply the metrics to three example problems: thermal decomposition of a polyurethane foam, a turbulent buoyant plume of helium, and compressibility effects on the growth rate of a turbulent free-shear layer. We discuss how the present metrics are easily interpretable for assessing computational model accuracy, as well as the impact of experimental measurement uncertainty on the accuracy assessment.

Barone, Matthew Franklin; Oberkampf, William Louis

2005-08-01T23:59:59.000Z

254

Common Carbon Metric | Open Energy Information  

Open Energy Info (EERE)

Common Carbon Metric Common Carbon Metric Jump to: navigation, search Tool Summary Name: Common Carbon Metric Agency/Company /Organization: United Nations Environment Programme, World Resources Institute Sector: Energy Focus Area: Buildings, Energy Efficiency, Industry Topics: GHG inventory, Implementation Resource Type: Guide/manual, Publications Website: www.unep.org/sbci/pdfs/Common-Carbon-Metric-for_Pilot_Testing_220410.p Common Carbon Metric Screenshot References: Common Carbon Metrics [1] "This paper is offered by the United Nations Environment Programme's Sustainable Buildings & Climate Initiative (UNEP-SBCI), a partnership between the UN and public and private stakeholders in the building sector, promoting sustainable building practices globally. The purpose of this

255

Report on Acquisition and Project Management Continuous Improvement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on Acquisition and Project Management Continuous Improvement on Acquisition and Project Management Continuous Improvement Report on Acquisition and Project Management Continuous Improvement EM senior management has committed to extensive management reforms and has completed several robust improvements in contract and project management. Additional improvement initiatives are continuing and this document outlines the consolidated plan of these initiatives in a top-down framework of EM vision, goals, strategies, performance metrics, and specific improvement actions completed or being undertaken. Report on Acquisition and Project Management Continuous Improvement More Documents & Publications Microsoft Word - EERE PSRP 7 23 2010 Testimony Before the House Appropriations Subcommittee on Energy and Water Development

256

The impact of organisational strategy, culture, people and technology management on organisational practice and performance: an empirical analysis  

Science Conference Proceedings (OSTI)

Many believe that better people management, technology management, organisational culture, and strategies lead to better organisational practices and performance. However, there is no reliable evidence to support this assertion. This paper employs structural ...

Purnendu Mandal; Somnath Mukhopadhyay; Kallol Bagchi; Angappa Gunasekaran

2012-12-01T23:59:59.000Z

257

Self-benchmarking Guide for Cleanrooms: Metrics, Benchmarks, Actions  

E-Print Network (OSTI)

for Cleanrooms: Metrics, Benchmarks, Actions Paul Mathew,efficiency metrics and benchmarks that can be used to trackalso use the metrics and benchmarks described in this guide

Mathew, Paul

2010-01-01T23:59:59.000Z

258

Self-benchmarking Guide for Data Centers: Metrics, Benchmarks, Actions  

E-Print Network (OSTI)

for Data Centers: Metrics, Benchmarks, Actions Paul Mathew,efficiency metrics and benchmarks that can be used to trackalso use the metrics and benchmarks described in this guide

Mathew, Paul

2010-01-01T23:59:59.000Z

259

NNSA Strategic Performance Evaluation Plan (PEP) FOR MANAGEMENT AND OPERATION OF  

National Nuclear Security Administration (NNSA)

MANAGEMENT AND OPERATION OF MANAGEMENT AND OPERATION OF Los Alamos National Security, LLC Contract Number: DE-AC52-06NA25396 Performance period: October 01, 2012 through September 30, 2013 Director ~;!;tory '1'/r/;L Steven K. Shook Date Chief, Prime Contracts Office Los Alamos National Laboratory Kevin W. Smith Manager Los Alamos Site Office :dd:.- Date 7J~;i;curity Ad~i]~/2-- Robert M. Poole Date Contracting Officer Los Alamos Site Office National Nuclear Security Administration INTRODUCTION The Los Alamos National Laboratory is managed by Los Alamos National Security,LLC, herein referenced as "Contractor", for the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). Pursuant to the terms and conditions of the Contract, and Clause H-12,

260

Metrics Evolution in an Energy Research & Development Program  

Science Conference Proceedings (OSTI)

All technology programs progress through three phases: Discovery, Definition, and Deployment. The form and application of program metrics needs to evolve with each phase. During the discovery phase, the program determines what is achievable. A set of tools is needed to define program goals, to analyze credible technical options, and to ensure that the options are compatible and meet the program objectives. A metrics system that scores the potential performance of technical options is part of this system of tools, supporting screening of concepts and aiding in the overall definition of objectives. During the definition phase, the program defines what specifically is wanted. What is achievable is translated into specific systems and specific technical options are selected and optimized. A metrics system can help with the identification of options for optimization and the selection of the option for deployment. During the deployment phase, the program shows that the selected system works. Demonstration projects are established and classical systems engineering is employed. During this phase, the metrics communicate system performance. This paper discusses an approach to metrics evolution within the Department of Energy's Nuclear Fuel Cycle R&D Program, which is working to improve the sustainability of nuclear energy.

Brent Dixon

2011-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Appendix B Metric and Thermal Conversion Tables  

U.S. Energy Information Administration (EIA)

2011 U.S. Energy Information Administration | Natural Gas Annual 193 Appendix B Metric and Thermal Conversion Tables

262

Industry-Wide Database for Power Transformers: Decision Support for Substation Asset Management  

Science Conference Proceedings (OSTI)

Asset managers need meaningful, defensible metrics to understand the implications of aging transformers and make informed decisions regarding maintenance, repair, and replacement of these high-dollar assets. To ensure that these meaningful metrics are established using the best available data, EPRI is developing an Industry-Wide Database (IDB) for power transformers.The IDB is a repository of detailed performance data on transformers pooled from supporting utilities. The IDB captures ...

2012-12-20T23:59:59.000Z

263

Local discriminative distance metrics ensemble learning  

Science Conference Proceedings (OSTI)

The ultimate goal of distance metric learning is to incorporate abundant discriminative information to keep all data samples in the same class close and those from different classes separated. Local distance metric methods can preserve discriminative ... Keywords: Distance metrics learning, Local learning

Yang Mu; Wei Ding; Dacheng Tao

2013-08-01T23:59:59.000Z

264

Energy and momentum in multiple metric theories  

E-Print Network (OSTI)

We derive the expressions for canonical energy, momentum, and angular momentum for multiple metric theories. We prove that although the metric fields are generally interacting, the total energy is the sum of conserved energies corresponding to each metric. A positive energy theorem is given as a result.

Talshir, Idan

2013-01-01T23:59:59.000Z

265

Energy and momentum in multiple metric theories  

E-Print Network (OSTI)

We derive the expressions for canonical energy, momentum, and angular momentum for multiple metric theories. We prove that although the metric fields are generally interacting, the total energy is the sum of conserved energies corresponding to each metric. A positive energy theorem is given as a result.

Talshir, Idan

2012-01-01T23:59:59.000Z

266

Science as Knowledge, Practice, and Map Making: The Challenge of Defining Metrics for Evaluating and Improving DOE-Funded Basic Experimental Science  

SciTech Connect

Industrial R&D laboratories have been surprisingly successful in developing performance objectives and metrics that convincingly show that planning, management, and improvement techniques can be value-added to the actual output of R&D organizations. In this paper, I will discuss the more difficult case of developing analogous constructs for DOE-funded non-nuclear, non-weapons basic research, or as I will refer to it - basic experimental science. Unlike most industrial R&D or the bulk of applied science performed at the National Renewable Energy Laboratory (NREL), the purpose of basic experimental science is producing new knowledge (usually published in professional journals) that has no immediate application to the first link (the R) of a planned R&D chain. Consequently, performance objectives and metrics are far more difficult to define. My claim is that if one can successfully define metrics for evaluating and improving DOE-funded basic experimental science (which is the most difficult case), then defining such constructs for DOE-funded applied science should be much less problematic. With the publication of the DOE Standard - Implementation Guide for Quality Assurance Programs for Basic and Applied Research (DOE-ER-STD-6001-92) and the development of a conceptual framework for integrating all the DOE orders, we need to move aggressively toward the threefold next phase: (1) focusing the management elements found in DOE-ER-STD-6001-92 on the main output of national laboratories - the experimental science itself; (2) developing clearer definitions of basic experimental science as practice not just knowledge; and (3) understanding the relationship between the metrics that scientists use for evaluating the performance of DOE-funded basic experimental science, the management elements of DOE-ER-STD-6001-92, and the notion of continuous improvement.

Bodnarczuk, M.

1993-03-01T23:59:59.000Z

267

Deep and wide metrics for HPC resource capability and project usage  

Science Conference Proceedings (OSTI)

This paper defines and demonstrates application of possible quantitative metrics for the qualitative notions of "deep" and "wide" HPC system use along with the related concepts of capability and capacity computing. By summarizing HPC workloads according ... Keywords: TeraGrid, capability, capacity, deep, high-performance computing, measurement, metrics, wide

David Hart

2011-11-01T23:59:59.000Z

268

An automated component-based performance experiment environment  

Science Conference Proceedings (OSTI)

Performance experiments can involve multiple iterative runs where parameters such as the execution platform, measurement tools, methods of measurement, application parameters, and analysis techniques can vary. In order to manage the layers of complexity ... Keywords: CCA, analysis, common component architecture, components, experiments, measurement, metrics

Van Bui; Boyana Norris; Lois Curfman McInnes

2009-11-01T23:59:59.000Z

269

Metric selection for evaluating human supervisory control of unmanned vehicles  

Science Conference Proceedings (OSTI)

Broad metric classes were proposed in the literature in order to facilitate metric selection for evaluating human-autonomous vehicle interaction. However, there still lacks a systematic method for selecting an efficient set of metrics from the many metrics ... Keywords: AHP, analytic hierarchy process, experiments, human supervisory control, metric quality, metrics

Birsen Donmez; M. L. Cummings

2010-09-01T23:59:59.000Z

270

Evaluation of the existing performance models used for pavement management by the Texas Department of Transportation  

E-Print Network (OSTI)

The pavement management information system (PMIS) and hics. the flexible pavement design software, FPS-19, used by the Texas Department of Transportation (TxDOT) for pavement management at network and project level respectively, generally do not give the same answer when the same set of data are used. This thesis is a part of the study to develop an approach for integrating pavement management systems at the two levels. The objective of the study is to identify which performance models were working satisfactorily and which needed to be modified. The performance models for ride quality (serviceability index for FPS-19), shallow rutting, deep rutting, and alligator cracking, which are the fundamental performance measures of the flexible pavements, were selected for evaluation. From the family of flexible pavements, the newly constructed pavements with untreated base were considered in the evaluation. A sensitivity analysis was performed to determine the relative importance of the input variables to FPS-I9 program. To reduce the number of problems to a manageable size, a one factor at a time approach was used. The F-statistics corresponding to the relevant input variables were used to determine the ranks. It was found that reliability level is the most important factor in FPS-19, followed by twenty-year projected axle repetition (ESAL). A research database was created by extracting data from the Long Term Pavement Performance (LTPP) database for pavement sections in Texas. A11 data items except rutting data were extracted using the software, Database 97. Rutting data was obtained from the LTPP regional office. Data from sixteen pavement sections were available for the evaluation. Elastic moduli of pavement layers and subgrades were back-calculated using MODULUS software. The selected performance models were evaluated using trend analyses, statistical hypotheses tests, percent difference, and estimated reliability. Due to the lack of data, all members of the performance model families could not be checked. It was observed that none of the selected performance models of PMIS and FPS-I9 is predicting the values observed at the LTPP sites though some of them are predicting better than others. Therefore, improvements are recommended for all the evaluated performance models.

Mukherjee, Biswajit

1998-01-01T23:59:59.000Z

271

Superior Energy Performance: Getting the Most Value from ISO 50001-Energy Management Systems  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Superior Energy Performance Superior Energy Performance cm : Getting the Most Value from ISO 50001- Energy Management Systems US Department of Energy Advanced Manufacturing Office March 13, 2012 Aimee McKane Lawrence Berkeley National Laboratory 2 | Industrial Energy Efficiency eere.energy.gov * Time and again, industrial energy efficiency has been demonstrated to be cost effective while having a positive effect on productivity * Despite this, energy efficiency improvements with very favorable payback periods often do not get implemented * Even projects that are implemented may not be sustained due to lack of supportive operational and maintenance practices Problem: Energy efficiency is not integrated into daily management practices. Solution: Staff at all levels within an organization need to be

272

Performance Analysis of Battery Power Management Schemes in Wireless Mobile Balakrishna J. Prabhu, A. Chockalingam and Vinod Sharma  

E-Print Network (OSTI)

Performance Analysis of Battery Power Management Schemes in Wireless Mobile Devices Balakrishna J Abstract--In this paper, we analyze the performance of battery power management schemes in wireless mobile devices using a queueing theory approach. We model the battery as a server with finite service capacity

Sharma, Vinod

273

SGDP Storage System Performance Supplement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis for the ARRA SGDP Analysis for the ARRA SGDP Energy Storage Projects Update Conference - DOE 2010 Energy Storage Systems Program (ESS) November 3, 2010 Presenter: Jacquelyn Bean Organization: DOE-National Energy Technology Laboratory (NETL) Funded in part by the Energy Storage Systems Program of the U.S. Department Of Energy through National Energy Technology Laboratory 1 Background 2 Metrics and Benefits Data Flow 3 Contact Information Table of Contents 1 4 Appendix NETL's role in SGDP metrics and benefits reporting 2 NETL Energy Delivery Technologies Division SGDP Technical Project Officers (TPOs) SGDP Principal Investigators (PIs) Project Management and Performance Data Analysis NETL Project Management Center's Analysis & Support Team Data Analysis Team (DAT) Lead Contractors: Booz Allen

274

16.2 - Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 16.2 (July 2012) Chapter 16.2 (July 2012) 1 Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non- Management and Operating Contracts [Reference: FAR 6, FAR 16, FAR 22, FAR 32, FAR 46, DEAR 915.404-4-72, DEAR 916.405-2, DEAR 970.1504-1, and Acquisition Guide Chapter 16.1] Overview The policy of the DOE is to maximize contractor performance and to align costs with performance through the use of performance-based management as a strategic contract management tool to plan for, manage, and evaluate contractor performance. An important function of contract administration is the ability, or the opportunity, to manage the environment within which the contracted effort is proceeding and, most importantly, to facilitate adjustments to that effort to meet the demand and changes as

275

Management Responsibilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Responsibilities Management Responsibilities Depleted UF6 Management Responsibilities DOE has responsibility for safe and efficient management of approximately 700,000 metric tons of depleted UF6. Organizational Responsibilities In the United States, the U.S. Department of Energy is responsible for managing all the depleted uranium that has been generated by the government and has been declared surplus to national defense needs. In addition, as a result of two memoranda of agreement that have been signed between the DOE and USEC, the DOE has assumed management responsibility for approximately 145,000 metric tons of depleted UF6 that has been or will be generated by USEC. Any additional depleted UF6 that USEC generates will be USEC's responsibility to manage. DOE Management Responsibility

276

Selecting Metrics for Sustainable Bioenergy Feedstocks  

SciTech Connect

Key decisions about land-use practices and dynamics in biofuel systems affect the long-term sustainability of biofuels. Choices about what crops are grown and how are they planted, fertilized, and harvested determine the effects of biofuels on native plant diversity, competition with food crops, and water and air quality. Those decisions also affect economic viability since the distance that biofuels must be transported has a large effect on the market cost of biofuels. The components of a landscape approach include environmental and socioeconomic conditions and the bioenergy features [type of fuel, plants species, management practices (e.g., fertilizer and pesticide applications), type and location of production facilities] and ecological and biogeochemical feedbacks. Significantly, while water (availability and quality) emerges as one of the most limiting factors to sustainability of bioenergy feedstocks, the linkage between water and bioenergy choices for land use and management on medium and large scales is poorly quantified. Metrics that quantify environmental and socioeconomic changes in land use and landscape dynamics provide a way to measure and communicate the influence of alternative bioenergy choices on water quality and other components of the environment. Cultivation of switchgrass could have both positive and negative environmental effects, depending on where it is planted and what vegetation it replaces. Among the most important environmental effects are changes in the flow regimes of streams (peak storm flows, base flows during the growing season) and changes in stream water quality (sediment, nutrients, and pesticides). Unfortunately, there have been few controlled studies that provide sufficient data to evaluate the hydrological and water quality impacts of conversion to switchgrass. In particular, there is a need for experimental studies that use the small watershed approach to evaluate the effects of growing a perennial plant as a biomass crop. Small watershed studies have been used for several decades to identify effects of vegetation type, disturbance, and land use and agriculture practices on hydrology and water quality. An ideal experimental design to determine the effects of conversion to switchgrass on surface water hydrology and quality would involve (1) small catchment (5-20 ha) drained by a perennial or ephemeral stream, (2) crop treatments including conversion from row crops to switchgrass; pasture to switchgrass (other likely scenarios); controls (no change in vegetation), (3) treatments to compare different levels of fertilization and pesticide application, (4) riparian treatments to compare riparian buffers with alternative cover types, and a treatment with no buffer, and (5) 3-4 replicates of each treatment or BACI (before-after, control-intervention) design for unreplicated treatments (ideally with several years of measurements prior to the imposition of treatments for BACI design). Hydrologic measurements would include soil moisture patterns with depth and over time; nitrogen and phosphorus chemistry; soil solution chemistry - major anions and cations, inorganic and organic forms of carbon, nitrogen and phosphorus; precipitation amount and chemical deposition; stream discharge; and streamwater chemistry. These water quality metrics would need to be put into context of the other environmental and social conditions that are altered by growth of bioenergy feedstocks. These conditions include farm profits and yield of food and fuel, carbon storage and release, and a variety of ecosystem services such as enhanced biodiversity and pollinator services. Innovations in landscape design for bioenergy feedstocks take into account environmental and socioeconomic dynamics and consequences with consideration of alternative bioenergy regimes and policies. The ideal design would be scale-sensitive so that economic, social, and environmental constraints can be measured via metrics applicable at relevant scales. To develop a landscape design, land managers must consider (1) what are the environmental im

Dale, Virginia H [ORNL; Kline, Keith L [ORNL; Mulholland, Patrick J [ORNL; Downing, Mark [ORNL; Graham, Robin Lambert [ORNL; Wright, Lynn L [ORNL

2009-01-01T23:59:59.000Z

277

PERFORMANCE OBJECTIVES FOR TANK FARM CLOSURE PERFORMANCE ASSESSMENTS  

Science Conference Proceedings (OSTI)

This report documents the performance objectives (metrics, times of analyses, and times of compliance) to be used in performance assessments of Hanford Site tank farm closure.

MANN, F.M.; CRUMPLER, J.D.

2005-09-30T23:59:59.000Z

278

Cyber Security Metrics and Measures abstract  

Science Conference Proceedings (OSTI)

Paul E. Black, Karen Scarfone, and Murugiah Souppaya, Cyber Security Metrics and Measures, in Wiley Handbook of Science and Technology for ...

2013-05-07T23:59:59.000Z

279

DEFINING A STANDARD METRIC FOR ELECTRICITY SAVINGS  

NLE Websites -- All DOE Office Websites (Extended Search)

DEFINING A STANDARD METRIC FOR ELECTRICITY SAVINGS Jonathan Koomey*, Hashem Akbari, Carl Blumstein, Marilyn Brown, Richard Brown, Chris Calwell, Sheryl Carter, Ralph Cavanagh,...

280

Defining a Standard Metric for Electricity Savings  

E-Print Network (OSTI)

1991. The Potential for Electricity Efficiency Improvementswww.eia.doe.gov/cneaf/electricity/page/eia860.html>. FigureA STANDARD METRIC FOR ELECTRICITY SAVINGS Jonathan Koomey*,

Koomey, Jonathan

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Argonne TDC: Phase Metrics - Argonne National Laboratory  

A magneto-optical imaging capability developed by Argonne, Phase Metrics, and the Institute of Solid State Physics (Moscow, Russia) could be the key to developing ...

282

Metric Week Begins 10/10/10!  

Science Conference Proceedings (OSTI)

... Begun by the National Council of Teachers of Mathematics on May 10, 1976, approximately one year after the Metric Conversion Act of 1975 ...

2010-10-07T23:59:59.000Z

283

Metrics and Methods for Consideration of Flexibility in Power System Planning  

Science Conference Proceedings (OSTI)

This report describes work done in 2012 as part of the Grid Planning “Strategic and Flexible Planning” project. This project is concerned with methods and metrics to assess power system flexibility to manage variability and uncertainty. In 2011, a two-tiered approach to this issue was proposed, and aspects of system flexibility were demonstrated. This year’s work continued the development of both high-level screening and detailed, simulation-based metrics and methods for assessing ...

2012-12-31T23:59:59.000Z

284

Certifying Industrial Energy Efficiency Performance: Aligning Management, Measurement, and Practice to Create Market Value  

E-Print Network (OSTI)

corporate energy management and system energy efficiency,its corporate energy management system and is now seekinghas sustainable energy management systems in place, has

McKane, Aimee; Scheihing, Paul; Williams, Robert

2008-01-01T23:59:59.000Z

285

Three-dimensional metrics as deformations of a constant curvature metric  

E-Print Network (OSTI)

Any three-dimensional Riemannian metric can be locally obtained by deforming a constant curvature metric along one direction. The general interest of this result, both in geometry and physics, and related open problems are stressed.

B. Coll; J. Llosa; D. Soler

2001-04-23T23:59:59.000Z

286

Generalized utility metrics for supercomputers  

E-Print Network (OSTI)

marketplace of high-performance computing. Parall Comput 3.Power ef?ciency · High performance computing market analysisactual installed high performance computing (HPC) systems

Strohmaier, Erich

2009-01-01T23:59:59.000Z

287

Information flow metrics analysis in object oriented programming and metrics validation process by RAA algorithm  

Science Conference Proceedings (OSTI)

Transparent data flow metrics and control flow metrics had no main concern which to be handled by a compiler. Nowadays similar hardware and multithreaded coding is increased. Consequently, both data flow and control flow become more important in analyses ... Keywords: Ant colony algorithm, Information flow metrics, Object oriented information flow, Object oriented programming, Rule accuracy algorithm, Rule induction

Abdul Jabbar; Subramani Sarala

2012-12-01T23:59:59.000Z

288

A goal question metric based approach for efficient measurement framework definition  

Science Conference Proceedings (OSTI)

In software engineering, measurements can be used to monitor, understand and improve software processes as well as products and resource utilization. Commonly, measurement frameworks are ambitious undertakings that require large data collection and analysis ... Keywords: GQM, change management, goal question metric, measurements, requirements management

Patrik Berander; Per Jönsson

2006-09-01T23:59:59.000Z

289

Implementing the data center energy productivity metric  

Science Conference Proceedings (OSTI)

As data centers proliferate in size and number, the endeavor to improve their energy efficiency and productivity is becoming increasingly important. We discuss the properties of a number of the proposed metrics of energy efficiency and productivity. ... Keywords: Energy, data center, metrics, productivity

Landon H. Sego; Andrés Márquez; Andrew Rawson; Tahir Cader; Kevin Fox; William I. Gustafson, Jr.; Christopher J. Mundy

2012-10-01T23:59:59.000Z

290

Modular Robot Motion Planning Using Similarity Metrics  

Science Conference Proceedings (OSTI)

In order for a modular self-reconfigurable robotic system to autonomously change from its current state to a desired one, it is critical to have a cost function (or metric) that reflects the effort required to reconfigure. A reconfiguration sequence ... Keywords: group, metric, modular robots, morphing, optimal assignment, pattern matching

Chih-Jung Chiang; Gregory S. Chirikjian

2001-01-01T23:59:59.000Z

291

Guide to Custom Reporting in Portfolio Manager®  

NLE Websites -- All DOE Office Websites (Extended Search)

o o o "How To" Series Guide to Custom Reporting in Portfolio Manager ® EPA's ENERGY STAR Portfolio Manager ® tool helps you measure and track energy use, water use, and greenhouse gas emissions of your buildings, all in a secure online environment. You can use the results to identify under-performing buildings, set investment priorities, verify efficiency improvements, and receive EPA recognition for superior energy performance. The reporting feature in Portfolio Manager offers a variety of reports and graphics to help you view and share Create a Custom Report 1. Create a report template. 2. Use the template you created to: Generate a custom report. Share your template. Request data from others. performance metrics. This includes standard reports with popular metrics, as well as custom reports

292

Interval Data Analysis with the Energy Charting and Metrics Tool (ECAM)  

SciTech Connect

Analyzing whole building interval data is an inexpensive but effective way to identify and improve building operations, and ultimately save money. Utilizing the Energy Charting and Metrics Tool (ECAM) add-in for Microsoft Excel, building operators and managers can begin implementing changes to their Building Automation System (BAS) after trending the interval data. The two data components needed for full analyses are whole building electricity consumption (kW or kWh) and outdoor air temperature (OAT). Using these two pieces of information, a series of plots and charts and be created in ECAM to monitor the buildings performance over time, gain knowledge of how the building is operating, and make adjustments to the BAS to improve efficiency and start saving money.

Taasevigen, Danny J.; Katipamula, Srinivas; Koran, William

2011-07-07T23:59:59.000Z

293

Radioactive Waste Management Complex low-level waste radiological performance assessment  

Science Conference Proceedings (OSTI)

This report documents the projected radiological dose impacts associated with the disposal of radioactive low-level waste at the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. This radiological performance assessment was conducted to evaluate compliance with applicable radiological criteria of the US Department of Energy and the US Environmental Protection Agency for protection of the public and the environment. The calculations involved modeling the transport of radionuclides from buried waste, to surface soil and subsurface media, and eventually to members of the public via air, groundwater, and food chain pathways. Projections of doses were made for both offsite receptors and individuals inadvertently intruding onto the site after closure. In addition, uncertainty and sensitivity analyses were performed. The results of the analyses indicate compliance with established radiological criteria and provide reasonable assurance that public health and safety will be protected.

Maheras, S.J.; Rood, A.S.; Magnuson, S.O.; Sussman, M.E.; Bhatt, R.N.

1994-04-01T23:59:59.000Z

294

Performance-Aware Power Management in Embedded Controllers with Multiple-Voltage Processors  

E-Print Network (OSTI)

The goal of this work is to minimize the energy dissipation of embedded controllers without jeopardizing the quality of control (QoC). Taking advantage of the dynamic voltage scaling (DVS) technology, this paper develops a performance-aware power management scheme for embedded controllers with processors that allow multiple voltage levels. The periods of control tasks are adapted online with respect to the current QoC, thus facilitating additional energy reduction over standard DVS. To avoid the waste of CPU resources as a result of the discrete voltage levels, a resource reclaiming mechanism is employed to maximize the CPU utilization and also to improve the QoC. Simulations are conducted to evaluate the performance of the proposed scheme. Compared with the optimal standard DVS scheme, the proposed scheme is shown to be able to save remarkably more energy while maintaining comparable QoC.

Xia, Feng; Ma, Longhua; Sun, Youxian; Dong, Jinxiang

2008-01-01T23:59:59.000Z

295

Commercial Building Performance Monitoring and Evaluation | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research Projects » Commercial Building Research Projects » Commercial Building Performance Monitoring and Evaluation Commercial Building Performance Monitoring and Evaluation The Building Technologies Office (BTO) uses performance metrics to standardize the measurement and characterization of energy performance in commercial buildings. These metrics help inform the effectiveness of energy efficiency measures in existing buildings and highlight opportunities to improve performance. Various tiers of metrics are available for different users. Performance Metrics Objectives Performance metrics deal with building energy consumption and on-site energy production. To be useful, industry must agree on standard definitions for these metrics and share consistent procedures for collecting and reporting data as well as ensuring data quality.

296

Result Summary for the Area 5 Radioactive Waste Management Site Performance Assessment Model Version 4.113  

Science Conference Proceedings (OSTI)

Preliminary results for Version 4.113 of the Nevada National Security Site Area 5 Radioactive Waste Management Site performance assessment model are summarized. Version 4.113 includes the Fiscal Year 2011 inventory estimate.

Shott, G. J.

2012-04-15T23:59:59.000Z

297

The Management of the Effects of a Hurricane: A Study of Higher Education Crisis Management Processes as Viewed through a Performance Management System  

E-Print Network (OSTI)

On September 13, 2008, Hurricane Ike, a huge storm with tropical storm force or greater winds extending 275 miles from the eye, made landfall in Galveston, Texas submerging over 75% of the city. In response to this crisis, Texas A&M University at Galveston, a small ocean oriented satellite school of 2000 students, deployed a never-before-attempted business continuity plan, relocating 91% of the student body and campus operations 150 miles inland to the mother campus of Texas A&M University in nine days. As a result, Texas A&M University at Galveston successfully weathered the storm and enjoyed a record enrollment the following spring semester. This dissertation utilized a case study methodology to look at the approach/planning process that went into the plan, the deployment of the plan, and the learning that took place throughout the crisis. In addition, the case study was considered through the use of a performance management system, specifically the Quality Texas Foundation - Engagement Level Criteria based on the Malcom Baldrige Quality Management Criteria, to determine whether this criteria might be appropriate for assessing future crisis response in higher education. All Texas A&M University at Galveston crisis team members were interviewed using the criteria to guide the discussion. The study revealed that the approach taken by the Texas A&M University at Galveston crisis team members was very timely in that a number of significant changes were implemented in the plan only a year prior to Hurricane Ike, initiated in response to Hurricanes Katrina and Rita’s impact on other universities. Furthermore while the approach outlined a plan that guided the relocation effort, significant areas that were not directly related to the relocation of the students, such as plans for the workforce not directly involved in the relocation and community involvement, were not adequately addressed. In deployment of the plan, the development of guiding principles to further align the thousands of decisions that would take place proved critical. The study further identified that the crisis team members incorporated learning into the approach and deployment of the plan, and established a very comprehensive assessment process immediately after the crisis. The study also revealed a number of valuable lessons for practice for use by other institutions as they develop their own crisis management plans. Lastly, the Quality Texas Foundation - Engagement Level Criteria provided a solid platform for crisis management assessment in higher education, particularly in large scale disaster type crises.

Sutherland, Todd

2013-08-01T23:59:59.000Z

298

Performance Analysis of Battery Power Management Schemes in Wireless Mobile Devices  

E-Print Network (OSTI)

In this paper, we analyze the performance of battery power management schemes in wireless mobile devices using a queueing theory approach. We model the battery as a server with finite service capacity and data packets as customers to be served. With an intent to exploit the recharging capability of the battery when left idle, we allow the battery to go on intentional vacations during which the battery can recharge itself. The recharge thus built up can effectively increase the number of customers served (in other words, battery life can be extended). Such improved battery life performance would, however, come at the expense of increased packet delay performance. We quantify the battery life gain versus delay performance trade-off in this approach through analysis and simulations. By considering a continuous recharge model of the battery, we derive expressions for the number of customers served and the mean delay for an M=GI=1 queueing system without and with server vacations. We show that allowing intentional vacations during busy periods helps to increase battery life, and that this approach can be beneficial when applied on traffic of delay-tolerant applications. We also propose a packet delay constrained power saving algorithm that will exploit the recharge phenomenon when packet delay constraints are imposed. I.

Balakrishna J. Prabhu; A. Chockalingam; Vinod Sharma

2002-01-01T23:59:59.000Z

299

Energy-Momentum Distribution in Weyl Metrics  

E-Print Network (OSTI)

In this paper, we evaluate energy and momentum density distributions for the Weyl metric by using the well-known prescriptions of Einstein, Landau-Lifshitz, Papaterou and M$\\ddot{o}$ller. The metric under consideration is the static axisymmetric vacuum solution to the Einstein field equations and one of the field equations represents the Laplace equation. Curzon metric is the special case of this spacetime. We find that the energy density is different for each prescription. However, momentum turns out to be constant in each case.

M. Sharif; Tasnim Fatima

2005-07-16T23:59:59.000Z

300

Data Collection and Reporting for Metrics and Benefits: Smart...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Reporting for Metrics and Benefits: Smart Grid Investment Grant Program Data Collection and Reporting for Metrics and Benefits: Smart Grid Investment Grant Program Presentation...

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Self-benchmarking Guide for Cleanrooms: Metrics, Benchmarks,...  

NLE Websites -- All DOE Office Websites (Extended Search)

Cleanrooms: Metrics, Benchmarks, Actions Title Self-benchmarking Guide for Cleanrooms: Metrics, Benchmarks, Actions Publication Type Report LBNL Report Number LBNL-3392E Year of...

302

Self-benchmarking Guide for Data Centers: Metrics, Benchmarks...  

NLE Websites -- All DOE Office Websites (Extended Search)

Data Centers: Metrics, Benchmarks, Actions Title Self-benchmarking Guide for Data Centers: Metrics, Benchmarks, Actions Publication Type Report LBNL Report Number LBNL-3393E Year...

303

Self-benchmarking Guide for Laboratory Buildings: Metrics, Benchmarks...  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory Buildings: Metrics, Benchmarks, Actions Title Self-benchmarking Guide for Laboratory Buildings: Metrics, Benchmarks, Actions Publication Type Report LBNL Report Number...

304

Metrics and Benchmarks for Energy Efficiency in Laboratories  

E-Print Network (OSTI)

Report 4-10-08 Metrics and Benchmarks for Energy Efficiencybenchmarking database. The benchmarks for standard, good andefficiency metrics and benchmarks for laboratories, which

Mathew, Paul; Rumsey Engineers

2008-01-01T23:59:59.000Z

305

An introduction to the mechanics of performance assessment using examples of calculations done for the Waste Isolation Pilot Plant between 1990 and 1992. Revision  

Science Conference Proceedings (OSTI)

This document provides an overview of the processes used to access the performance of the Waste Isolation Pilot Plant (WIPP). The quantitative metrics used in the performance-assessment (PA) process are those put forward in the Environmental Protection Agency`s Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, HIgh-LEvel and transuranic radioactive Wastes (40 CFR 191).

Rechard, R.P.

1996-06-01T23:59:59.000Z

306

Improving Outage Performance: Outage Optimization Process  

SciTech Connect

Planned outage performance is a key measure of how well an Nuclear Power Plant (NPP) is operated. Performance during planned outages strongly affects virtually all of a plant's performance metrics. In recognition of this fact, NPP operators worldwide have and continue to focus on improving their outage performance. The process of improving outage performance is commonly referred to as 'Outage Optimization' in the industry. This paper starts with a summary of the principles of Outage Optimization. It then provides an overview of a process in common use in the USA and elsewhere to manage the improvement of planned outages. The program described is comprehensive in that it involves managing improvement in both the Preparation and Execution phases of outage management. (author)

LaPlatney, Jere J. [AREVA NP (United States)

2006-07-01T23:59:59.000Z

307

Spatial Error Metrics for Oceanographic Model Verification  

Science Conference Proceedings (OSTI)

A common problem with modern numerical oceanographic models is spatial displacement, including misplacement and misshapenness of ocean circulation features. Traditional error metrics, such as least squares methods, are ineffective in many such ...

Sean B. Ziegeler; James D. Dykes; Jay F. Shriver

2012-02-01T23:59:59.000Z

308

Clean Cities Annual Metrics Report 2009 (Revised)  

SciTech Connect

Document provides Clean Cities coalition metrics about the use of alternative fuels; the deployment of alternative fuel vehicles, hybrid electric vehicles (HEVs), and idle reduction initiatives; fuel economy activities; and programs to reduce vehicle miles driven.

Johnson, C.

2011-08-01T23:59:59.000Z

309

Does General Relativity Require a Metric  

E-Print Network (OSTI)

The nexus between the gravitational field and the space-time metric was an essential element in Einstein's development of General Relativity and led him to his discovery of the field equations for the gravitational field/metric. I will argue here that the metric is in fact an inessential element of this theory and can be dispensed with entirely. Its sole function in the theory was to describe the space-time measurements made by ideal clocks and rods. However, the behavior of model clocks and measuring rods can be derived directly from the field equations of General Relativity using the Einstein-Infeld-Hoffmann (EIH) approiximation procedure. Therefore one does not need to introduce these ideal clocks and rods and hence has no need of a metric.

James L. Anderson

1999-12-13T23:59:59.000Z

310

Metrics of Risk Associated with Defects Rediscovery  

E-Print Network (OSTI)

Software defects rediscovered by a large number of customers affect various stakeholders and may: 1) hint at gaps in a software manufacturer's Quality Assurance (QA) processes, 2) lead to an over-load of a software manufacturer's support and maintenance teams, and 3) consume customers' resources, leading to a loss of reputation and a decrease in sales. Quantifying risk associated with the rediscovery of defects can help all of these stake-holders. In this chapter we present a set of metrics needed to quantify the risks. The metrics are designed to help: 1) the QA team to assess their processes; 2) the support and maintenance teams to allocate their resources; and 3) the customers to assess the risk associated with using the software product. The paper includes a validation case study which applies the risk metrics to industrial data. To calculate the metrics we use mathematical instruments like the heavy-tailed Kappa distribution and the G/M/k queuing model.

Miranskyy, Andriy V; Reesor, Mark

2011-01-01T23:59:59.000Z

311

Security Services Management (Section B)  

Science Conference Proceedings (OSTI)

To take the next step in information security, Security Services Management provides a comprehensive approach to managing people, process, and technology through the sound application of metrics. This book demonstrates how to develop a balanced strategy ...

James S. Tiller

2007-07-01T23:59:59.000Z

312

Practical Diagnostics for Evaluating Residential Commissioning Metrics  

SciTech Connect

In this report, we identify and describe 24 practical diagnostics that are ready now to evaluate residential commissioning metrics, and that we expect to include in the commissioning guide. Our discussion in the main body of this report is limited to existing diagnostics in areas of particular concern with significant interactions: envelope and HVAC systems. These areas include insulation quality, windows, airtightness, envelope moisture, fan and duct system airflows, duct leakage, cooling equipment charge, and combustion appliance backdrafting with spillage. Appendix C describes the 83 other diagnostics that we have examined in the course of this project, but that are not ready or are inappropriate for residential commissioning. Combined with Appendix B, Table 1 in the main body of the report summarizes the advantages and disadvantages of all 107 diagnostics. We first describe what residential commissioning is, its characteristic elements, and how one might structure its process. Our intent in this discussion is to formulate and clarify these issues, but is largely preliminary because such a practice does not yet exist. Subsequent sections of the report describe metrics one can use in residential commissioning, along with the consolidated set of 24 practical diagnostics that the building industry can use now to evaluate them. Where possible, we also discuss the accuracy and usability of diagnostics, based on recent laboratory work and field studies by LBNL staff and others in more than 100 houses. These studies concentrate on evaluating diagnostics in the following four areas: the DeltaQ duct leakage test, air-handler airflow tests, supply and return grille airflow tests, and refrigerant charge tests. Appendix A describes those efforts in detail. In addition, where possible, we identify the costs to purchase diagnostic equipment and the amount of time required to conduct the diagnostics. Table 1 summarizes these data. Individual equipment costs for the 24 practical diagnostics range from a few hundred dollars to many thousands of dollars. The higher costs are associated with infrared thermography and state-of-the-art automated diagnostic systems. Most tests can be performed in one hour or less, using equipment priced toward the lower end of the cost spectrum.

Wray, Craig; Walker, Iain; Siegel, Jeff; Sherman, Max

2002-06-11T23:59:59.000Z

313

Custom Reporting: Full List of Available Information and Metrics  

NLE Websites -- All DOE Office Websites (Extended Search)

Custom Reporting: Custom Reporting: Full List of Available Information and Metrics Cost Performance Metrics Units Energy Cost Dollars Energy Cost Intensity Dollars National Median Energy Cost Dollars Total Water Cost (All Water Types) Dollars Indoor Water Cost (All Water Types) Dollars Indoor Water Cost Intensity (All Water Types) Dollars/ft2 Outdoor Water Cost (All Water Types) Dollars Investment in Energy Projects, Cumulatve Dollars Investment in Energy Projects, Cumulatve Dollars/ft2 Water/Wastewater Investment in Energy Projects, Cumulative Dollars/GPD Estimated Savings from Energy Projects, Cumulative Dollars Estimated Savings from Energy Projects, Cumulative Dollars/ft2 Water/Wastewater Estimated Savings from Energy Projects, Cumulative Dollars/GPD Electricity (Grid Purchase) Cost Dollars

314

Electronic Performance Support System: An Application Guideline: Solving Power Plant Workforce Management Issues with Electronic Performance Support and Knowledge Management Solutions  

Science Conference Proceedings (OSTI)

This report provides guidance on how to apply electronic performance support system (EPSS) solutions to address fossil and hydroelectric power plant employee performance issues arising from the aging workforce and changing demographics of future employees.

2004-03-31T23:59:59.000Z

315

Evidential structures and metrics for network forensics  

Science Conference Proceedings (OSTI)

Evaluation of forensics evidence is an essential step in proving the malicious intents of an attacker or adversary and the severity of the damages caused to any network. This paper takes a step forward showing how security metrics can be used to sustain ... Keywords: CVSS, NFR, common vulnerability scoring system, evidential database, evidential structure, network attacks, network evidence, network forensic readiness, network forensics, security metrics

Ahmad R. Amran; Raphael C-W. Phan; David J. Parish; John N. Whitley

2010-12-01T23:59:59.000Z

316

The use of energy management and control systems to monitor the energy performance of commercial buildings  

SciTech Connect

Monitored data play a very important part in the implementation and evaluation of energy conservation technologies and programs. However, these data can be expensive to collect, so there is a need for lower-cost alternatives. In many situations, using the computerized Energy Management and Control Systems (EMCSs)--already installed in many buildings--to collect these commercial building performance data has advantages over more conventional methods. This method provides data without installing incremental hardware, and the large amounts of available operational data can be a very rich resource for understanding building performance. This dissertation addresses several of these issues. One specific objective is to describe a monitoring-project planning process that includes definition of objectives, constraints, resources and approaches for the monitoring. The choice of tools is an important part of this process. The dissertation goes on to demonstrate, through eight case studies, that EMCS monitoring is possible, and to identify and categorize the problems and issues that can be encountered. These issues lead to the creation, use, and testing of a set of methods for evaluation of EMCS monitoring, in the form of guidelines. Finally, EMCS monitoring is demonstrated and compared with conventional monitoring more methodically in a detailed case study.

Heinemeier, K.E. [Univ. of California, Berkeley, CA (United States). Dept. of Architecture]|[Lawrence Berkeley Lab., CA (United States). Energy and Environment Div.

1994-12-01T23:59:59.000Z

317

NIST Revises Software Patch Management Guide for ...  

Science Conference Proceedings (OSTI)

... to computer systems quickly to minimize the window of opportunity for ... of enterprise patch management technologies and briefly covers metrics for ...

2012-10-16T23:59:59.000Z

318

U.S. Department of Energy, Office of Legacy Management Post Competition Accountability Report: High Performing Organization Proposal May 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Office of Legacy Management Energy, Office of Legacy Management Post Competition Accountability Report: High Performing Organization Proposal May 2012 This report serves as an official record of the annual cost, personnel, and performance information for the Office of Legacy Management to satisfy the post competition accountability requirements. Reporting Period: Fiscal Years (FY) 2012 - 2016 FY2013 Annual Report Management Excellence Goals Driving Top Priorities Target FY2012 FY2013 FY2014 FY2015 FY2016 1. Achieve EMS/Sustainability Goals (normalized to the number of legacy sites). Be a leader among DOE offices in sustainability.* Annual   2. Publish Post Competition Accountability Report on the LM internet. Quarterly   3. Conduct independent evaluations of key programs, projects, or technical issues by goal

319

Daylight metrics and energy savings  

E-Print Network (OSTI)

Aizlewood. Innovative daylighting systems: An experimentalthe performance of daylighting systems are highly dependantin daylighting and with the use of innovative systems, the

Mardaljevic, John

2011-01-01T23:59:59.000Z

320

Evaluation of transient agility metrics through unmanned simulation of the X-31 post-stall aircraft  

E-Print Network (OSTI)

Development of post-stall capable aircraft has enhanced the research of agility, the ability of an aircraft to quickly and precisely change from its present state to a desired new state, and its measurement. Controlled high angle of attack (AOA) flight and rapid nose-pointing are now realities with thrust vectoring. Traditional measures of merit are incapable of comprehensively describing the rapid changes in aircraft state during close-in combat. As complements to conventional performance measures of merit, agility metrics provide a more complete description of an aircraft's rapid maneuvering capabilities. A batch simulation model of the RockwelVMBB X-31A aircraft is used to evaluate recommended open-loop longitudinal, lateral, and axial agility metrics for their effectiveness in describing transient agility characteristics, maneuvering in the 1-3 second time scale, of a post-stall fighter. Comparison to Valasek and Downing's conventional fighter aircraft agility simulations is done for each axis of agility tests, and the performance improvements due to thrust vectoring are highlighted. The power loss rate and onset rate axial agility metrics are acceptable descriptors of an aircraft's ability to rapidly transition between energy levels. The power loss rate test is modified to include a rapid pitch up maneuver and evaluate the ability to create induced drag and maximize power loss rate. The post-stall axial agility metric. Longitudinal nose pointing metrics maneuver is recommended as a post-stall axial agility metric. Longitudinal nose pointing metrics effectively describe post-stall agility and performance improvements due to thrust vectoring with the maximum, minimum, and average pitch rate metrics. A new flight path agility measure, the pitch impulse metric, is developed and simulated on the X-3 IA to describe an aircraft's balance of maximum load factor generation and maintenance during a pitch maneuver. High and low AOA lateral agility tests also show improved roll performance about the velocity vector. A high AOA loaded roll metric is developed using the integral of the velocity vector roll rate as the angle of interest. Acquisition of the X-31A batch simulation Version-120 is recommended as well as incorporating the newly acquired Agile-VU visualization program with metric research and flying recommended closed-loop agility maneuvers on the fixed-base simulator for post-stall agility evaluation.

Fischer, Shiloh Douglas

1996-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Metrics for the National SCADA Test Bed Program  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy Office of Electricity Delivery and Energy Reliability (DOE-OE) National SCADA Test Bed (NSTB) Program is providing valuable inputs into the electric industry by performing topical research and development (R&D) to secure next generation and legacy control systems. In addition, the program conducts vulnerability and risk analysis, develops tools, and performs industry liaison, outreach and awareness activities. These activities will enhance the secure and reliable delivery of energy for the United States. This report will describe metrics that could be utilized to provide feedback to help enhance the effectiveness of the NSTB Program.

Craig, Philip A.; Mortensen, J.; Dagle, Jeffery E.

2008-12-05T23:59:59.000Z

322

Sustained System Performance (SSP) Benchmark  

NLE Websites -- All DOE Office Websites (Extended Search)

John M. Shalf, and Erich Strohmaier Background The NERSC Approach to Procurement Benchmarks The NERSC-5 SSP The NERSC-6 SSP The Effective System Performance (ESP) Metric...

323

Modelling adaptive management of intercropping in vineyards to satisfy agronomic and environmental performances under Mediterranean climate  

Science Conference Proceedings (OSTI)

In the Mediterranean area, rainfed viticulture is exposed to irregular rainfall distribution. The impacts on production and environment can be mitigated by appropriate management practices like, for instance, the introduction of cover crop in the inter-rows ... Keywords: Adaptive management, Climate variability, Cover crop, Ecosystem services, Flexibility, Grapevine water status, Modelling, Soil surface management

Aude Ripoche; Jean-Pierre Rellier; Roger Martin-Clouaire; Nakié Paré; Anne Biarnès; Christian Gary

2011-12-01T23:59:59.000Z

324

Benchmarking optimization software with performance profiles  

E-Print Network (OSTI)

Mar 15, 2001 ... Abstract: We propose performance profiles -- probability distribution functions for a performance metric -- as a tool for benchmarking and ...

325

Annex A Metrics for the Smart Grid System Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annex A Annex A Metrics for the Smart Grid System Report A.iii Table of Contents Introduction ........................................................................................................................................... A.1 Metric #1: The Fraction of Customers and Total Load Served by Real-Time Pricing, Critical Peak Pricing, and Time-of-Use Pricing ........................................................................................ A.2 Metric #2: Real-Time System Operations Data Sharing ...................................................................... A.9 Metric #3: Standard Distributed Resource Connection Policies .......................................................... A.18 Metric #4: Regulatory Recovery for Smart Grid Investments ............................................................. A.23

326

APPLICATION OF MICROECONOMIC METRICS IN COMPETITIVE ELECTRICITY Pedro Correia and George Gross  

E-Print Network (OSTI)

for managing the grid usage. The commercial transactions take place using the electric network or grid, a factAPPLICATION OF MICROECONOMIC METRICS IN COMPETITIVE ELECTRICITY MARKETS Pedro Correia and George Gross Department of Electrical and Computer Engineering University of Illinois at Urbana

Gross, George

327

Metric concepts and implications in describing compositional changes for world river's water chemistry  

Science Conference Proceedings (OSTI)

The paper is designed to give the reader an outline that is useful for understanding the importance of distance, as a metric concept, and its implications when compositional (geochemical) data are managed from a statistical point of view in a given sample ... Keywords: Compositions, Distance, River geochemistry, Simplex space

A. Buccianti; R. Magli

2011-05-01T23:59:59.000Z

328

Certifying Industrial Energy Efficiency Performance: AligningManagement, Measurement, and Practice to Create Market Value  

SciTech Connect

More than fifteen years after the launch of programs in theU.K. and U.S., industry still offers one of the largest opportunities forenergy savings worldwide. The International Energy Agency (IEA) estimatesthe savings potential from cost-optimization of industrial motor-drivensystems alone at 7 percent of global electricity use. The U.S. Departmentof Energy (USDOE) Industrial Technologies Program estimates 7 percentsavings potential in total US industrial energy use through theapplication of proven best practice. Simple paybacks for these types ofprojects are frequently two years or less. The technology required toachieve these savings is widely available; the technical skills requiredto identify energy saving opportunities are known and transferable.Although programs like USDOE's Best Practices have been highlysuccessful, most plants, as supported by 2002 MECS data, remain eitherunaware or unmotivated to improve their energy efficiency--as evidencedby the 98 percent of US industrial facilities reporting to MECS say thatthey lack a full-time energy manager. With the renewed interest in energyefficiency worldwide and the emergence of carbon trading and newfinancial instruments such as white certificates1, there is a need tointroduce greater transparency into the way that industrial facilitiesidentify, develop, and document energy efficiency projects. Historically,industrial energy efficiency projects have been developed by plantengineers, frequently with assistance from consultants and/or supplierswith highly specialized technical skills. Under this scenario,implementation of energy efficiency improvements is dependent onindividuals. These individuals typically include "champions" within anindustrial facility or corporation, working in cooperation withconsultants or suppliers who have substantial knowledge based on years ofexperience. This approach is not easily understood by others without thisspecialized technical knowledge, penetrates the market fairly slowly, andhas no assurance of persistence, since champions may leave the company orbe reassigned after project completion.This paper presents an alternatescenario that builds on the body of expert knowledge concerning energymanagement best practices and the experience of industrial champions toengage industry in continuous energy efficiency improvement at thefacility rather than the individual level. Under this scenario,standardized methodologies for applying and validating energy managementbest practices in industrial facilities will be developed through aconsensus process involving both plant personnel and specializedconsultants and suppliers. The resulting protocols will describe aprocess or framework for conducting an energy savings assessment andverifying the results that will be transparent to policymakers, managers,and the financial community, and validated by a third-party organization.Additionally, a global dialogue is being initiated by the United NationsIndustrial Development Organization (UNIDO) concerning the development ofan international industrial energy management standard that would be ISOcompatible. The proposed scenario will combine the resulting standardwith the best practice protocols for specific energy systems (i.e.,steam, process heating, compressed air, pumping systems, etc.) to formthe foundation of a third party, performance-based certification programfor the overall industrial facility that is compatible with existingmanagement systems, including ISO 9001:2000, 14001:2004 and 6 Sigma. Thelong term goal of this voluntary, industry designed certification programis to develop a transparent, globally accepted system for validatingenergy efficiency projects and management practices. This system wouldcreate a verified record of energy savings with potential market valuethat could be recognized among sectors and countries.

McKane, Aimee; Scheihing, Paul; Williams, Robert

2007-07-01T23:59:59.000Z

329

Certifying Industrial Energy Efficiency Performance: AligningManagement, Measurement, and Practice to Create Market Value  

SciTech Connect

More than fifteen years after the launch of programs in theU.K. and U.S., industry still offers one of the largest opportunities forenergy savings worldwide. The International Energy Agency (IEA) estimatesthe savings potential from cost-optimization of industrial motor-drivensystems alone at 7 percent of global electricity use. The U.S. Departmentof Energy (USDOE) Industrial Technologies Program estimates 7 percentsavings potential in total US industrial energy use through theapplication of proven best practice. Simple paybacks for these types ofprojects are frequently two years or less. The technology required toachieve these savings is widely available; the technical skills requiredto identify energy saving opportunities are known and transferable.Although programs like USDOE's Best Practices have been highlysuccessful, most plants, as supported by 2002 MECS data, remain eitherunaware or unmotivated to improve their energy efficiency--as evidencedby the 98 percent of US industrial facilities reporting to MECS say thatthey lack a full-time energy manager. With the renewed interest in energyefficiency worldwide and the emergence of carbon trading and newfinancial instruments such as white certificates1, there is a need tointroduce greater transparency into the way that industrial facilitiesidentify, develop, and document energy efficiency projects. Historically,industrial energy efficiency projects have been developed by plantengineers, frequently with assistance from consultants and/or supplierswith highly specialized technical skills. Under this scenario,implementation of energy efficiency improvements is dependent onindividuals. These individuals typically include "champions" within anindustrial facility or corporation, working in cooperation withconsultants or suppliers who have substantial knowledge based on years ofexperience. This approach is not easily understood by others without thisspecialized technical knowledge, penetrates the market fairly slowly, andhas no assurance of persistence, since champions may leave the company orbe reassigned after project completion.This paper presents an alternatescenario that builds on the body of expert knowledge concerning energymanagement best practices and the experience of industrial champions toengage industry in continuous energy efficiency improvement at thefacility rather than the individual level. Under this scenario,standardized methodologies for applying and validating energy managementbest practices in industrial facilities will be developed through aconsensus process involving both plant personnel and specializedconsultants and suppliers. The resulting protocols will describe aprocess or framework for conducting an energy savings assessment andverifying the results that will be transparent to policymakers, managers,and the financial community, and validated by a third-party organization.Additionally, a global dialogue is being initiated by the United NationsIndustrial Development Organization (UNIDO) concerning the development ofan international industrial energy management standard that would be ISOcompatible. The proposed scenario will combine the resulting standardwith the best practice protocols for specific energy systems (i.e.,steam, process heating, compressed air, pumping systems, etc.) to formthe foundation of a third party, performance-based certification programfor the overall industrial facility that is compatible with existingmanagement systems, including ISO 9001:2000, 14001:2004 and 6 Sigma. Thelong term goal of this voluntary, industry designed certification programis to develop a transparent, globally accepted system for validatingenergy efficiency projects and management practices. This system wouldcreate a verified record of energy savings with potential market valuethat could be recognized among sectors and countries.

McKane, Aimee; Scheihing, Paul; Williams, Robert

2007-07-01T23:59:59.000Z

330

Coordinated resource management for guaranteed high performance and efficient utilization in Lambda-Grids  

E-Print Network (OSTI)

Journal of High Performance Computing Applications, AugustConference on High Performance Computing and Communication (Symposium on High-Performance Computing in an Advanced

Taesombut, Nut

2007-01-01T23:59:59.000Z

331

Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook, July 2011, Federal Energy Management Program (FEMP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Leadership in Environmental, Energy, and Economic Performance Comprehensive Federal Fleet Management Handbook July 2011 Visit femp.energy.gov/pdfs/eo13514_fleethandbook.pdf for the latest version of this Handbook. i Comprehensive Federal Fleet Management Handbook Contacts Mark Reichhardt Federal Energy Management Program (FEMP) U.S. Department of Energy (DOE) 202-586-4788 federal_fleets@ee.doe.gov FEMP General Contact Information EE-2L 1000 Independence Avenue, SW Washington, DC 20585-0121 202-586-5772 DOE's Office of Energy Efficiency and Renewable Energy (EERE) Information Center 877-337-3463 www.eere.energy.gov/informationcenter/ Acknowledgements This document was prepared by Julian Bentley of LMI in McLean, Virginia, and Ryan Daley of the

332

Algorithms and Methodologies for Integrated Substation Equipment Risk and Performance Assessment Tools for Asset Management and Smar t Grid  

Science Conference Proceedings (OSTI)

EPRI has developed a suite of algorithms and methodologies designed to assess substation equipment performance and risk. These tools and the supporting databases have been enhanced to provide projections of future performance and risk. Utilizing these algorithms and tools, asset and maintenance managers can make better-informed decisions about current and future investments. This report lays out the rationale underlying the development of these tools and sets the foundation for their effective use by uti...

2009-12-23T23:59:59.000Z

333

Non-Intrusive Autonomic Approach with Self-Management Policies Applied to Legacy Infrastructures for Performance Improvements  

Science Conference Proceedings (OSTI)

The growing complexity of large IT facilities involves important time and effort costs to operate and maintain. Autonomic computing gives a new approach in designing distributed architectures that manage themselves in accordance with high-level objectives. ... Keywords: Autonomic Computing, Distributed, Grid, Legacy, Performance, Policies

Rémi Sharrock; Thierry Monteil; Patricia Stolf; Daniel Hagimont; Laurent Broto

2011-01-01T23:59:59.000Z

334

Proceedings of the tenth annual DOE low-level waste management conference: Session 2: Site performance assessment  

Science Conference Proceedings (OSTI)

This document contains twelve papers on various aspects of low-level radioactive waste management. Topics of this volume include: performance assessment methodology; remedial action alternatives; site selection and site characterization procedures; intruder scenarios; sensitivity analysis procedures; mathematical models for mixed waste environmental transport; and risk assessment methodology. Individual papers were processed separately for the database. (TEM)

Not Available

1988-12-01T23:59:59.000Z

335

Performance Assessment Transport Modeling of Uranium at the Area 5 Radioactive Waste Management Site at the Nevada National Security Site  

SciTech Connect

Following is a brief summary of the assumptions that are pertinent to the radioactive isotope transport in the GoldSim Performance Assessment model of the Area 5 Radioactive Waste Management Site, with special emphasis on the water-phase reactive transport of uranium, which includes depleted uranium products.

NSTec Radioactive Waste

2010-10-12T23:59:59.000Z

336

Certifying Industrial Energy Efficiency Performance: Aligning Management, Measurement, and Practice to Create Market Value  

E-Print Network (OSTI)

that the plant has sustainable energy management systems inneeded to create sustainable energy efficiency in industry.industry’s approach to sustainable energy efficiency that

McKane, Aimee; Scheihing, Paul; Williams, Robert

2008-01-01T23:59:59.000Z

337

Projective Space Codes for the Injection Metric  

E-Print Network (OSTI)

In the context of error control in random linear network coding, it is useful to construct codes that comprise well-separated collections of subspaces of a vector space over a finite field. In this paper, the metric used is the so-called "injection distance", introduced by Silva and Kschischang. A Gilbert-Varshamov bound for such codes is derived. Using the code-construction framework of Etzion and Silberstein, new non-constant-dimension codes are constructed; these codes contain more codewords than comparable codes designed for the subspace metric.

Khaleghi, Azadeh

2009-01-01T23:59:59.000Z

338

Incremental reference resolution: the task, metrics for evaluation, and a Bayesian filtering model that is sensitive to disfluencies  

Science Conference Proceedings (OSTI)

In this paper we do two things: a) we discuss in general terms the task of incremental reference resolution (IRR), in particular resolution of exophoric reference, and specify metrics for measuring the performance of dialogue system components tackling ...

David Schlangen; Timo Baumann; Michaela Atterer

2009-09-01T23:59:59.000Z

339

EPC Constrution Project Management: Integrating PMO and MIS to Become the Beacon of Performance Growth  

Science Conference Proceedings (OSTI)

The introduction of PMO (Project Management Overnight) model in EPC general contract builds the PMO modular management of EPC contractor, which will achieve the control of the internal comsumption and the modular supervision of the EPC project process. ... Keywords: construction enterprises, contractors, EPC, PMO, modularization, informtion system

Zhang Jing-xiao; Li Hui; Zhou Tian-hua; Lu Ning

2010-06-01T23:59:59.000Z

340

Management  

E-Print Network (OSTI)

Research has indicated that, depending upon driver and passenger characteristics, passengers can have either a positive or negative influence upon driver behaviour. In conclusion to a recent study investigating the roles that passengers can play to influence, positively and negatively, driver behaviour, Regan and Mitsopoulos (2001) recommended, among other things, that the principles of Crew Resource Management (CRM) training may increase passengers ’ ability to positively influence driver behaviour and also drivers ’ ability to accept constructive feedback. The present study investigated the potential application of CRM training within young driver training in the Australian Capital Territory (ACT). This involved a literature review, an analysis of the differences between the driving and aviation domains, an analysis of the team-based activities and the knowledge, skills and attitudes required during driving to perform those activities, consultation with CRM experts from the aviation and medicine domains and the conduct of six focus groups involving young learner drivers, provisional licence drivers and course teachers. The findings indicate that CRM training as part of young driver training in the ACT is a viable concept to pursue. The application of CRM training within young driver training has potential to significantly enhance the positive and reduce the negative effects of passengers on young driver behaviour, and thus the safety of young drivers and passengers alike. The outcomes of this study formed the basis for a set of recommendations for the development of a young driver CRM training program in the ACT.

Young Drivers; Eve Mitsopoulos; Michael Regan; Janet Anderson; Paul Salmon; Jessica Edquist; Ii Report Documentation Page

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

System Performance Measurement Supports Design Recommendations for Solar Ventilation Preheat System (Brochure), Federal Energy Management Program (FEMP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System Performance System Performance Measurement Supports Design Recommendations for Solar Ventilation Preheat System The U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP) sponsored the installation of a data monitoring system to analyze the efficiency and performance of a large solar ventilation preheat (SVP) system. The system was installed at a Federal installation to reduce energy consumption and costs and to help meet Federal energy goals and mandates. SVP systems draw ventilation air in through a perforated metal solar collector with a dark color on the south side of a build-

342

Improving AMBER, an MT evaluation metric  

Science Conference Proceedings (OSTI)

A recent paper described a new machine translation evaluation metric, AMBER. This paper describes two changes to AMBER. The first one is incorporation of a new ordering penalty; the second one is the use of the downhill simplex algorithm to tune the ...

Boxing Chen; Roland Kuhn; George Foster

2012-06-01T23:59:59.000Z

343

Cohesion and coupling metrics for ontology modules  

Science Conference Proceedings (OSTI)

In recent years, an increasing number of ontologies and semantic web applications have been developed and used. A conscious effort has been made to develop methods to modularize ontologies. These methods contribute to building a new ontology. However, ... Keywords: Cohesion, Coupling, Metrics, Modularity, Ontology

Sunju Oh; Heon Y. Yeom; Joongho Ahn

2011-06-01T23:59:59.000Z

344

Federal Energy Management Program (FEMP): What`s new in federal energy management: Program overview: Energy savings performance contracting  

SciTech Connect

The Energy Policy Act of 1992 and Executive Order 12902 require that Federal agencies reduce the energy consumed in Federal buildings. Goal was increased to 30% by 2005, compared with 1985. Energy Savings Performance Contracting (ESPC) offers a means of achieving this energy reduction goal at no capital cost to the government. ESPC is an alternative to the traditional method of financing energy efficiency improvement in Federal buildings; it involves contracting with energy service companies.

1996-08-01T23:59:59.000Z

345

Service Providers That Exchange Data with Portfolio Manager via Web  

NLE Websites -- All DOE Office Websites (Extended Search)

Service Providers That Exchange Data with Portfolio Manager via Service Providers That Exchange Data with Portfolio Manager via Web Services Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training Service Providers That Exchange Data with Portfolio Manager via Web Services The companies listed below use EPA's Portfolio Manager web services to deliver ENERGY STAR energy performance scores and metrics as part of their

346

Specification of an Information Delivery Tool to Support Optimal Holistic Environmental and Energy Management in Buildings  

SciTech Connect

Building performance assessment for the operational phase of a building's life cycle is heuristic, typically working from available historical metered data and focusing on bulk energy assessment. Building Management Systems are used in the operational phase of the building to control the building's internal environment according to the design criteria outlined during the design phase. Recent developments in mechanisms that communicate building performance such as standardized building performance objectives and metrics enable the use of the output from whole building energy simulation tools by nontechnical personnel and all project stakeholders. This paper proposes to specify and demonstrate the utilization of an Information Delivery Tool that supports optimum holistic environmental and energy analysis aimed at an established profile of building managers utilizing standardized performance objectives and metrics.

O' Donnell, James; Keane, Marcus; Bazjanac, Vladimir

2008-07-01T23:59:59.000Z

347

Utility Vegetation Management: Use of Reliability-Centered Maintenance Concepts to Improve Performance  

Science Conference Proceedings (OSTI)

This document describes the approach taken to adapt and apply the principles of reliability-centered maintenance (RCM) to vegetation management (VM) activities on an overhead electric distribution system. The project included a review of relevant literature, production of an RCM primer for vegetation managers, development of VM-specific failure mode and effect analysis (FMEA) methods, and production of a structured process and information tool useful in completing an RCM-based assessment of a distributio...

2009-11-30T23:59:59.000Z

348

New Categorical Metrics for Air Quality Model Evaluation  

Science Conference Proceedings (OSTI)

Traditional categorical metrics used in model evaluations are “clear cut” measures in that the model’s ability to predict an “exceedance” is defined by a fixed threshold concentration and the metrics are defined by observation–forecast sets that ...

Daiwen Kang; Rohit Mathur; Kenneth Schere; Shaocai Yu; Brian Eder

2007-04-01T23:59:59.000Z

349

Numerical Consistency of Metric Terms in Terrain-Following Coordinates  

Science Conference Proceedings (OSTI)

In numerically integrating the equations of motion in terrain-following coordinates, care must be taken in treating the metric terms that arise due to the sloping coordinate surfaces. In particular, metric terms that appear in the advection and ...

Joseph B. Klemp; William C. Skamarock; Oliver Fuhrer

2003-07-01T23:59:59.000Z

350

EM Partnering Initiative: Journey to Excellence Metric No. 3.5 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Partnering Initiative: Journey to Excellence Metric No. 3.5 Partnering Initiative: Journey to Excellence Metric No. 3.5 EM Partnering Initiative: Journey to Excellence Metric No. 3.5 Partnering establishes a collaborative approach among the Government and Contractor to achieve results. Partnering is not a contract; it does not alter the contractual relationship of the two parties. This teaming approach is based upon open communication, collaboration, and commitment to joint success. Partnering refocuses the nature of the working relationship based upon mutual goals and objectives. This model emphasizes early detection of problems and issues and proactive resolution of issues sooner than would happen through the normal process of performance and reporting. Partnering, therefore, is a commitment to perform in a collaborative manner as members

351

On the history of fourth order metric theories of gravitation  

E-Print Network (OSTI)

We present the history of fourth order metric theories of gravitation from its beginning in 1918 until 1988.

R. Schimming; H. -J. Schmidt

2004-12-08T23:59:59.000Z

352

Financial Metrics Data Collection Protocol, Version 1.0  

SciTech Connect

Brief description of data collection process and plan that will be used to collect financial metrics associated with sustainable design.

Fowler, Kimberly M.; Gorrissen, Willy J.; Wang, Na

2010-04-30T23:59:59.000Z

353

Lachesis: robust database storage management based on device-specific performance characteristics  

Science Conference Proceedings (OSTI)

Database systems work hard to tune I/O performance, but do not always achieve the full performance potential of modern disk systems. Their abstracted view of storage components hides useful device-specific characteristics, such as disk track boundaries ...

Jiri Schindler; Anastassia Ailamaki; Gregory R. Ganger

2003-09-01T23:59:59.000Z

354

Context-based metrics for evaluating changes to web pages  

E-Print Network (OSTI)

The web provides a lot of fluid information but this information changes, moves, and even disappears over time. Bookmark lists, portals, and paths are collections where the building blocks are web pages, which are susceptible to these changes. A lot of research, both in industry and in academia, focuses on organizing this vast amount of data. In this thesis, I present context-based algorithms for measuring changes to a document. The methods proposed use other documents in a collection as the context for evaluating changes in the web pages. These metrics will be used in maintaining paths as the individual pages in paths change. This approach will enhance the evaluations of change made by the currently existing Path Manager, in the Walden's Paths project that is being developed in the Center for the Study of Digital Libraries at Texas A&M University.

Dash, Suvendu Kumar

2003-12-01T23:59:59.000Z

355

A quantum metric of organizational performance: Terrorism and counterterrorism  

Science Conference Proceedings (OSTI)

Political terrorism and insurgency have become the primary means of global war among states. Lacking comparable military and political means to compete directly with Western civilization, many failed states and tribes have honed the art of asymmetric ... Keywords: Organization theory, Quantum models, Terrorism

W. F. Lawless; Margo Bergman; J. Louçã; Nicole N. Kriegel; Nick Feltovich

2007-09-01T23:59:59.000Z

356

2010 Performance Metrics for Intelligent Systems (PerMIS'10) ...  

Science Conference Proceedings (OSTI)

... Intelligent systems for Hazardous Environments (eg nuclear remediation); Smart Grid; Space Robotics; Medical & Healthcare. Past Workshops. ...

2013-05-19T23:59:59.000Z

357

2001 Performance Metrics for Intelligent Systems (PerMIS'01) ...  

Science Conference Proceedings (OSTI)

... Date: Tuesday, September 4, 2001. Format: Workshop. Sponsor(s): PerMIS 2001 White Paper (pdf). Final Proceedings (pdf).

2013-11-27T23:59:59.000Z

358

2004 Performance Metrics for Intelligent Systems (PerMIS'04) ...  

Science Conference Proceedings (OSTI)

... Cooperations with IEEE Computational Intelligence Society. ... Landauer, Aerospace Integration Science Corp., USA S. Lee, Samsung Advanced Inst. ...

2013-04-26T23:59:59.000Z

359

Performance Metrics for Intelligent Systems (PerMIS)  

Science Conference Proceedings (OSTI)

... and partnerships, dissemination of ideas, and future collaborations in an ... measures in various domains, eg,; Intelligent transportation systems; ...

2013-12-06T23:59:59.000Z

360

2002 Performance Metrics for Intelligent Systems (PerMIS'02) ...  

Science Conference Proceedings (OSTI)

... M. Asada, Osaka University, Japan GA Bekey, University ... Inc., USA D. Fogel, Natural Selection, Inc ... NASA, USA T. Whalen, Georgia State University ...

2013-01-13T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Measuring Performance of Systems with Autonomy: Metrics for ...  

Science Conference Proceedings (OSTI)

... risky. It is typical for humans to have a portfolio of ... What do you think, which human ... your question concerning the contribution of consciousness as a ...

2011-05-25T23:59:59.000Z

362

2009 Performance Metrics for Intelligent Systems (PerMIS'09) ...  

Science Conference Proceedings (OSTI)

... Technical Contact: General Chair Elena Messina, NIST Program Chair Raj Madhavan, ORNL/NIST. Publicity Chair E. Tunstel, JHU-APL. ...

2012-12-13T23:59:59.000Z

363

2006 Performance Metrics for Intelligent Systems (PerMIS'06) ...  

Science Conference Proceedings (OSTI)

... Technical Contact: General Chair Elena Messina, NIST. Honorary Chair Alexander Meystel. Program Chair Raj Madhavan, ORNL/NIST.

2013-05-31T23:59:59.000Z

364

2007 Performance Metrics for Intelligent Systems (PerMIS'07) ...  

Science Conference Proceedings (OSTI)

... and modeling support. Technology readiness measures ... Hazardous environments (eg, nuclear remediation); ... Eric Krotkov Griffin Technologies USA. ...

2013-01-13T23:59:59.000Z

365

2000 Performance Metrics for Intelligent Systems (PerMIS'00) ...  

Science Conference Proceedings (OSTI)

... Format: Workshop. Sponsor(s): NIST, DARPA, IEEE, NASA, in cooperation with IEEE Neural Network Council. PerMIS 2000 Agenda (pdf). ...

2013-01-13T23:59:59.000Z

366

Performance Metrics and Test Arenas for Autonomous Mobile ...  

Science Conference Proceedings (OSTI)

... Jackrit Suthakorn, Mahidol University, Thailand (Exec 2011-2014); Andreas Birk, International University Bremen, Germany (Exec Emeritus). ...

2013-01-02T23:59:59.000Z

367

2003 Performance Metrics for Intelligent Systems (PerMIS'03) ...  

Science Conference Proceedings (OSTI)

... Italy; K. Passino, Ohio State University, USA; L. Perlovsky, AFRL/SNHE, USA; L. Pouchard, Oak Ridge National Lab, USA; J ...

2012-11-13T23:59:59.000Z

368

2012 Performance Metrics for Intelligent Systems (PerMIS'12) ...  

Science Conference Proceedings (OSTI)

... Intelligent Transportation Systems; Defense and Security; Emergency Response ... and Robots for Hazardous Environments (eg nuclear remediation); ...

2012-11-21T23:59:59.000Z

369

Proceedings of the Workshop on Performance Metrics for Intelligent Systems  

Science Conference Proceedings (OSTI)

As software and hardware become increasingly interwoven, new opportunities and challenges emerge. The field of Cyber-Physical Systems (CPS) - hybrid networked cyber and engineered physical elements co-designed to create adaptive and predictive systems ...

Elena Messina; Raj Madhavan

2012-03-01T23:59:59.000Z

370

Improving the performance metrics of enzymatic biofuel cells.  

E-Print Network (OSTI)

??The shift towards renewable energy solutions in order to meet the demands of an exponentially growing populace has resulted in significant amounts of research into… (more)

Little, Shannon

2010-01-01T23:59:59.000Z

371

Tangent spaces to metric spaces and to their subspaces  

E-Print Network (OSTI)

We investigate a tangent space at a point of a general metric space and metric space valued derivatives. The conditions under which two different subspace of a metric space have isometric tangent spaces in a common point of these subspaces are completely determinated.

Dovgoshey, O

2009-01-01T23:59:59.000Z

372

The Universal Connection and Metrics on Moduli Spaces  

E-Print Network (OSTI)

We introduce a class of metrics on gauge theoretic moduli spaces. These metrics are made out of the universal matrix that appears in the universal connection construction of M. S. Narasimhan and S. Ramanan. As an example we construct metrics on the c_{2}=1 SU(2) moduli space of instantons on R^4 for various universal matrices.

Fortune Massamba; George Thompson

2003-11-12T23:59:59.000Z

373

Measured energy savings and performance of power-managed personal computers and monitors  

SciTech Connect

Personal computers and monitors are estimated to use 14 billion kWh/year of electricity, with power management potentially saving $600 million/year by the year 2000. The effort to capture these savings is lead by the US Environmental Protection Agency`s Energy Star program, which specifies a 30W maximum demand for the computer and for the monitor when in a {open_quote}sleep{close_quote} or idle mode. In this paper the authors discuss measured energy use and estimated savings for power-managed (Energy Star compliant) PCs and monitors. They collected electricity use measurements of six power-managed PCs and monitors in their office and five from two other research projects. The devices are diverse in machine type, use patterns, and context. The analysis method estimates the time spent in each system operating mode (off, low-, and full-power) and combines these with real power measurements to derive hours of use per mode, energy use, and energy savings. Three schedules are explored in the {open_quotes}As-operated,{close_quotes} {open_quotes}Standardized,{close_quotes} and `Maximum` savings estimates. Energy savings are established by comparing the measurements to a baseline with power management disabled. As-operated energy savings for the eleven PCs and monitors ranged from zero to 75 kWh/year. Under the standard operating schedule (on 20% of nights and weekends), the savings are about 200 kWh/year. An audit of power management features and configurations for several dozen Energy Star machines found only 11% of CPU`s fully enabled and about two thirds of monitors were successfully power managed. The highest priority for greater power management savings is to enable monitors, as opposed to CPU`s, since they are generally easier to configure, less likely to interfere with system operation, and have greater savings. The difficulties in properly configuring PCs and monitors is the largest current barrier to achieving the savings potential from power management.

Nordman, B.; Piette, M.A.; Kinney, K.

1996-08-01T23:59:59.000Z

374

Clean Cities 2010 Annual Metrics Report  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

0 Annual 0 Annual Metrics Report Caley Johnson Technical Report NREL/TP-7A30-52714 October 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Clean Cities 2010 Annual Metrics Report Caley Johnson Prepared under Task No. VTP.20020 Technical Report NREL/TP-7A30-52714 October 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

375

Clean Cities 2011 Annual Metrics Report  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

1 Annual 1 Annual Metrics Report Caley Johnson National Renewable Energy Laboratory Technical Report NREL/TP-7A30-56091 December 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Clean Cities 2011 Annual Metrics Report Caley Johnson Prepared under Task No. VTP2.0020 Technical Report NREL/TP-7A30-56091 December 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty,

376

Null limits of the C-metric  

E-Print Network (OSTI)

The C-metric is usually understood as describing two black holes which accelerate in opposite directions under the action of some conical singularity. Here, we examine all the solutions of this type which represent accelerating sources and investigate the null limit in which the accelerations become unbounded. We show that the resulting space-times represent spherical impulsive gravitational waves generated by snapping or expanding cosmic strings.

J. Podolsky; J. B. Griffiths

2000-06-27T23:59:59.000Z

377

A Year of Radiation Measurements at the North Slope of Alaska Second Quarter 2009 ARM and Climate Change Prediction Program Metric Report  

SciTech Connect

In 2009, the Atmospheric Radiation Measurement (ARM) Program and the Climate Change Prediction Program (CCPP) have been asked to produce joint science metrics. For CCPP, the second quarter metrics are reported in Evaluation of Simulated Precipitation in CCSM3: Annual Cycle Performance Metrics at Watershed Scales. For ARM, the metrics will produce and make available new continuous time series of radiative fluxes based on one year of observations from Barrow, Alaska, during the International Polar Year and report on comparisons of observations with baseline simulations of the Community Climate System Model (CCSM).

S.A. McFarlane, Y. Shi, C.N. Long

2009-04-15T23:59:59.000Z

378

FY08-10 Project Success Metrics vFinal to Post 2011-07-20.xlsx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8-2010 Project Success Metrics 8-2010 Project Success Metrics Office of Management Office of Engineering and Construction Management Program Contractor Project Name Site Approved Budget ($M) Met Success Standard Fiscal Year Completed National Nuclear Security Administration Los Alamos National Security, LLC Chemistry & Metallurgy Research Facility Radiological Laboratory Utility Office Building Los Alamos National Laboratory, NM $ 164.00 Y 2010 National Nuclear Security Administration B&W Pantex, LLC Gas Main and Distribution System Upgrade Pantex Plant, TX $ 10.82 Y 2010 National Nuclear Security Administration National Security Technologies, LLC Mercury Highway Construction Nevada National Security Site, NV

379

Intelligent Management of the Power Grid: An Anticipatory, Multi-Agent, High-Performance Computing Approach  

Science Conference Proceedings (OSTI)

The goal of the Consortium for the Intelligent Management of the Electric Power Grid (CIMEG) is to advance a new approach that uses anticipatory strategies for local, proactive security assessment, defense, and self-healing of the electric power grid. This report describes CIMEG's research activities during 1999.

2000-05-26T23:59:59.000Z

380

DevoFlow: scaling flow management for high-performance networks  

Science Conference Proceedings (OSTI)

OpenFlow is a great concept, but its original design imposes excessive overheads. It can simplify network and traffic management in enterprise and data center environments, because it enables flow-level control over Ethernet switching and provides global ... Keywords: data center, flow-based networking, switch design

Andrew R. Curtis; Jeffrey C. Mogul; Jean Tourrilhes; Praveen Yalagandula; Puneet Sharma; Sujata Banerjee

2011-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

AppFlow: Autonomic Performance-Per-Watt Management of Large-Scale Data Centers  

Science Conference Proceedings (OSTI)

The characteristic of dramatic fluctuation in the resource provisioning for real-time applications calls for an elastic delivery of computing services. Current data center deployment schemes, which feature a strong tie between servers and applications, ... Keywords: Autonomic Computing, Data Center, Power Management

Bithika Khargharia; Haoting Luo; Youssif Al-Nashif; Salim Hariri

2010-12-01T23:59:59.000Z

382

Q-clouds: managing performance interference effects for QoS-aware clouds  

Science Conference Proceedings (OSTI)

Cloud computing offers users the ability to access large pools of computational and storage resources on demand. Multiple commercial clouds already allow businesses to replace, or supplement, privately owned IT assets, alleviating them from the burden ... Keywords: cloud computing, resource management, virtualization

Ripal Nathuji; Aman Kansal; Alireza Ghaffarkhah

2010-04-01T23:59:59.000Z

383

Adaptive Thermal Management for High-Performance Microprocessors David Brooks and Margaret Martonosi  

E-Print Network (OSTI)

Martonosi Dept. of Electrical Engineering Princeton University fdbrooks,mrmg@ee.princeton.edu Abstract. With the increasing usage of clock gating tech- niques, the average power dissipation typically seen by common dynamic thermal management, the CPU can be designed for a much lower maximum power rat- ing with minimal

Martonosi, Margaret

384

On the Metric of Space-time  

E-Print Network (OSTI)

Maxwell's equations are obeyed in a one-parameter group of isotropic gravity-free flat space-times whose metric depends upon the value of the group parameter. An experimental determination of this value has been proposed. If it is zero, the metric is Minkowski's. If it is non-zero, the metric is not Poincare invariant and local frequencies of electromagnetic waves change as they propagate. If the group parameter is positive, velocity independent red shifts develop and the group parameter plays a role similar to that of Hubble's constant in determining the relation of these redshifts to propagation distance. In the resulting space-times, the velocity dependence of Doppler shifts is a function of propagation distance. If the group parameter and Hubble's constant have the same order of magnitude, observed frequency shifts in radiation received from stellar sources can imply source velocities quite different from those implied in Minkowski space. In these space-times, electromagnetic waves received from bodies in galactic Kepler orbits undergo frequency shifts which are indistinguishable from shifts currently attributed to dark matter and dark energy in Minkowski space, or to a non-Newtonian physics.

Carl E. Wulfman

2013-02-02T23:59:59.000Z

385

Full list of Portfolio Manager custom reporting metrics | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

manufacturing resources K-12 school resources Multifamily housing resources Restaurant resources Retail resources Senior care resources Small business resources State and...

386

Certifying Industrial Energy Efficiency Performance: Aligning Management, Measurement, and Practice to Create Market Value  

E-Print Network (OSTI)

Certifying Industrial Energy Efficiency Performance:to improve their energy efficiency- as evidenced by the 98%the renewed interest in energy efficiency worldwide and the

McKane, Aimee; Scheihing, Paul; Williams, Robert

2008-01-01T23:59:59.000Z

387

Metrics for Availability Analysis Using a Discrete Event Simulation Method  

Science Conference Proceedings (OSTI)

The system performance metric 'availability' is a central concept with respect to the concerns of a plant's operators and owners, yet it can be abstract enough to resist explanation at system levels. Hence, there is a need for a system-level metric more closely aligned with a plant's (or, more generally, a system's) raison d'etre. Historically, availability of repairable systems - intrinsic, operational, or otherwise - has been defined as a ratio of times. This paper introduces a new concept of availability, called endogenous availability, defined in terms of a ratio of quantities of product yield. Endogenous availability can be evaluated using a discrete event simulation analysis methodology. A simulation example shows that endogenous availability reduces to conventional availability in a simple series system with different processing rates and without intermediate storage capacity, but diverges from conventional availability when storage capacity is progressively increased. It is shown that conventional availability tends to be conservative when a design includes features, such as in - process storage, that partially decouple the components of a larger system.

Schryver, Jack C [ORNL; Nutaro, James J [ORNL; Haire, Marvin Jonathan [ORNL

2012-01-01T23:59:59.000Z

388

Microsoft PowerPoint - DOE-RL Hanford Metrics Presentation.pptx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from the Field: from the Field: Implementing Cyber Security Metrics that Work Rick Grandy & Gregg Serene Cyber Security MSA/Lockheed Martin DOE Hanford Site "To make our customers extraordinarily successful in our unified mission of cleaning up the Hanford cleaning up the Hanford Site..." Hanford Site Scope - 586 square miles - 9 000+ PCs 9,000+ PCs - 500+ servers - 400+ applications - 1 000+ miles fiber to 300 bldgs 1,000+ miles fiber to 300 bldgs - 12,500+ phones 2 Why Metrics? * How do you know if you're How do you know if you re doing well in school? * How do you know if an athlete is performing well? p g * How do you know if you're o do you o you e healthy? - Weight, Blood Pressure 3 Why Metrics? * Does a FISMA Score of "A" mean... - The cyber program is more effective? - The cyber program is more efficient?

389

How Does Your Data Center Measure Up? Energy Efficiency Metrics and Benchmarks for Data Center Infrastructure Systems  

SciTech Connect

Data centers are among the most energy intensive types of facilities, and they are growing dramatically in terms of size and intensity [EPA 2007]. As a result, in the last few years there has been increasing interest from stakeholders - ranging from data center managers to policy makers - to improve the energy efficiency of data centers, and there are several industry and government organizations that have developed tools, guidelines, and training programs. There are many opportunities to reduce energy use in data centers and benchmarking studies reveal a wide range of efficiency practices. Data center operators may not be aware of how efficient their facility may be relative to their peers, even for the same levels of service. Benchmarking is an effective way to compare one facility to another, and also to track the performance of a given facility over time. Toward that end, this article presents the key metrics that facility managers can use to assess, track, and manage the efficiency of the infrastructure systems in data centers, and thereby identify potential efficiency actions. Most of the benchmarking data presented in this article are drawn from the data center benchmarking database at Lawrence Berkeley National Laboratory (LBNL). The database was developed from studies commissioned by the California Energy Commission, Pacific Gas and Electric Co., the U.S. Department of Energy and the New York State Energy Research and Development Authority.

Mathew, Paul; Greenberg, Steve; Ganguly, Srirupa; Sartor, Dale; Tschudi, William

2009-04-01T23:59:59.000Z

390

Energy consumption characterization as an input to building management and performance benchmarking - a case study PPT  

E-Print Network (OSTI)

The present paper aims at describing the methodology and presents some final results of a work developed in the field of building energy benchmarking applied to the buildings of the Polytechnic Institute of Leiria, based on a thorough energy performance characterization of each of its buildings, looking specifically at the typology of canteen. Developing building energy performance benchmarking systems enables the comparison of actual consumption of individual buildings against others of the same typology and against targets previously defined. The energy performance indicator was computed based on two different relevant elements, the net floor area and number of served meals. Then, the results were ranked according to the percentile rules previously established, and compared. An environmental analysis based on equivalent CO2 emissions was also performed for each building.

Bernardo, H.; Neves, L.; Oliveira, F.; Quintal, E.

2012-01-01T23:59:59.000Z

391

FY 2009 Annual Report of Joule Software Metric SC GG 3.1/2.5.2, Improve Computational Science Capabilities  

Science Conference Proceedings (OSTI)

The Joule Software Metric for Computational Effectiveness is established by Public Authorizations PL 95-91, Department of Energy Organization Act, and PL 103-62, Government Performance and Results Act. The U.S. Office of Management and Budget (OMB) oversees the preparation and administration of the President s budget; evaluates the effectiveness of agency programs, policies, and procedures; assesses competing funding demands across agencies; and sets the funding priorities for the federal government. The OMB has the power of audit and exercises this right annually for each federal agency. According to the Government Performance and Results Act of 1993 (GPRA), federal agencies are required to develop three planning and performance documents: 1.Strategic Plan: a broad, 3 year outlook; 2.Annual Performance Plan: a focused, 1 year outlook of annual goals and objectives that is reflected in the annual budget request (What results can the agency deliver as part of its public funding?); and 3.Performance and Accountability Report: an annual report that details the previous fiscal year performance (What results did the agency produce in return for its public funding?). OMB uses its Performance Assessment Rating Tool (PART) to perform evaluations. PART has seven worksheets for seven types of agency functions. The function of Research and Development (R&D) programs is included. R&D programs are assessed on the following criteria: Does the R&D program perform a clear role? Has the program set valid long term and annual goals? Is the program well managed? Is the program achieving the results set forth in its GPRA documents? In Fiscal Year (FY) 2003, the Department of Energy Office of Science (DOE SC-1) worked directly with OMB to come to a consensus on an appropriate set of performance measures consistent with PART requirements. The scientific performance expectations of these requirements reach the scope of work conducted at the DOE national laboratories. The Joule system emerged from this interaction. Joule enables the chief financial officer and senior DOE management to track annual performance on a quarterly basis. Joule scores are reported as success, goal met (green light in PART), mixed results, goal partially met (yellow light in PART), and unsatisfactory, goal not met (red light in PART). Joule links the DOE strategic plan to the underlying base program targets.

Kothe, Douglas B [ORNL; Roche, Kenneth J [ORNL; Kendall, Ricky A [ORNL

2010-01-01T23:59:59.000Z

392

Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook, June 2010, Federal Energy Management Program (FEMP)  

Science Conference Proceedings (OSTI)

Comprehensive Federal fleet management guide offered as a companion to Executive Order 13514 Section 12 guidance.

Not Available

2010-06-01T23:59:59.000Z

393

Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook, July 2011, Federal Energy Management Program (FEMP)  

SciTech Connect

Comprehensive Federal fleet management guide offered as a companion to Executive Order 13514 Section 12 guidance.

2011-07-01T23:59:59.000Z

394

Performance measures for evaluating public participation activities in DOE`s Office of Environmental Management  

Science Conference Proceedings (OSTI)

Public participation in decision-making in the United States has become a dominant theme throughout the public sector and is increasingly used in the private sector. Recent reports by the National Research Council and the Commission on Risk Assessment and Risk Management, set up jointly by the White House and Congress, conclude that risk decisions must increasingly be structured in such a manner as to involve stakeholders meaningfully in the processes and activities leading to decisions and, perhaps, through decision implementation. Both of these reports indicate that decisions may take longer but be better if officials: (1) bring all interested and affected parties to the table at the beginning of the risk-discussion process; (2) identify relevant concerns, losses, exposures and other information the parties have; (3) address significant concerns through appropriate research; and (4) present findings in an understandable, accessible way. This report is intended to facilitate subsequent evaluations of public participation activities and programs.

Carnes, S.A.; Schweitzer, M.; Peelle, E.B.; Wolfe, A.K.; Munro, J.F.

1996-08-01T23:59:59.000Z

395

Message from the Owner of the Improved Financial Performance Initiative of the Presidents Management Agenda:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I am enthusiastic and proud to be the owner of the Improved Financial Performance initiative of the President's Management Agenda (PMA) in the Department of Energy (DOE). The Department has received clean opinions on its annual financial statements for six straight years with no material internal control weaknesses identified by the auditors. Further, DOE was successful in maintaining its clean opinion for the FY 2004 financial statements while accelerating issuance to 45 days after the end of the fiscal year. For the third quarter of FY 2004, when the Department of Energy received a Green status score on Improved Financial Performance, DOE was one of only five agencies with a Green status score on this initiative. I am enormously proud

396

DOE Uranium Leasing Program - Lease Tract Metrics  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Uranium Leasing Program -- Lease Tract Metrics Uranium Leasing Program -- Lease Tract Metrics Lease Tract Lessee Lease Date Bid (%) Reclamation Bond a Total Acres Acres Excluded b Comment C-JD-5 Gold Eagle Mining, Inc. 04/30/08 12.00 37,000 150.71 C-JD-5A Golden Eagle Uranium, LLC 06/27/08 20.10 5,000 24.54 C-JD-6 Cotter Corporation 04/30/08 14.20 19,000 530.08 C-JD-7 c Cotter Corporation 04/30/08 27.30 1,206,000 493.01 C-JD-8 Cotter Corporation 04/30/08 36.20 4,000 954.62 C-JD-8A No bids received - remains inactive N/A N/A N/A 77.91 C-JD-9 Cotter Corporation 04/30/08 24.30 72,000 1,036.50 C-SR-10 Golden Eagle Uranium, LLC 06/27/08 13.10 5,000 637.64 C-SR-11 Cotter Corporation 04/30/08 11.67 43,000 1,303.22 200.25 Summit Canyon area excluded from lease tract C-SR-11A Golden Eagle Uranium, LLC 06/27/08 14.30 5,000 1,296.81 C-SR-12 Colorado Plateau Partners 06/27/08

397

Defining a Standard Metric for Electricity Savings  

SciTech Connect

The growing investment by governments and electric utilities in energy efficiency programs highlights the need for simple tools to help assess and explain the size of the potential resource. One technique that is commonly used in this effort is to characterize electricity savings in terms of avoided power plants, because it is easier for people to visualize a power plant than it is to understand an abstraction such as billions of kilowatt-hours. Unfortunately, there is no standardization around the characteristics of such power plants. In this letter we define parameters for a standard avoided power plant that have physical meaning and intuitive plausibility, for use in back-of-the-envelope calculations. For the prototypical plant this article settles on a 500 MW existing coal plant operating at a 70percent capacity factor with 7percent T&D losses. Displacing such a plant for one year would save 3 billion kW h per year at the meter and reduce emissions by 3 million metric tons of CO2 per year. The proposed name for this metric is the Rosenfeld, in keeping with the tradition among scientists of naming units in honor of the person most responsible for the discovery and widespread adoption of the underlying scientific principle in question--Dr. Arthur H. Rosenfeld.

Brown, Marilyn; Akbari, Hashem; Blumstein, Carl; Koomey, Jonathan; Brown, Richard; Calwell, Chris; Carter, Sheryl; Cavanagh, Ralph; Chang, Audrey; Claridge, David; Craig, Paul; Diamond, Rick; Eto, Joseph H.; Fulkerson, William; Gadgil, Ashok; Geller, Howard; Goldemberg, Jose; Goldman, Chuck; Goldstein, David B.; Greenberg, Steve; Hafemeister, David; Harris, Jeff; Harvey, Hal; Heitz, Eric; Hirst, Eric; Hummel, Holmes; Kammen, Dan; Kelly, Henry; Laitner, Skip; Levine, Mark; Lovins, Amory; Masters, Gil; McMahon, James E.; Meier, Alan; Messenger, Michael; Millhone, John; Mills, Evan; Nadel, Steve; Nordman, Bruce; Price, Lynn; Romm, Joe; Ross, Marc; Rufo, Michael; Sathaye, Jayant; Schipper, Lee; Schneider, Stephen H; Sweeney, James L; Verdict, Malcolm; Vorsatz, Diana; Wang, Devra; Weinberg, Carl; Wilk, Richard; Wilson, John; Worrell, Ernst

2009-03-01T23:59:59.000Z

398

Energy Savings Performance Contracts (ESPCs) (Fact Sheet), Federal Energy Management Program (FEMP)  

NLE Websites -- All DOE Office Websites (Extended Search)

Photovoltaics installed on the Harold Washington Social Security Center in Illinois as Photovoltaics installed on the Harold Washington Social Security Center in Illinois as part of an ESPC. Photo from U.S. Social Security Administration, NREL/PIX 19006 Energy Savings Performance Contracts (ESPCs) Energy savings performance contracts (ESPCs) allow Federal agencies to conduct energy projects with limited to no up-front capital costs, minimizing the need for Congressional appropriations. An ESPC is a working relationship between a Federal agency and an energy service company (ESCO). The ESCO conducts a comprehensive energy audit for the Federal facility and identifies improvements to save energy. In consultation with the Federal agency, the ESCO designs and constructs a project that meets the agency's needs

399

Energy Savings Performance Contracts (ESPCs) (Fact Sheet), Federal Energy Management Program (FEMP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Photovoltaics installed on the Harold Washington Social Security Center in Illinois as Photovoltaics installed on the Harold Washington Social Security Center in Illinois as part of an ESPC. Photo from U.S. Social Security Administration, NREL/PIX 19006 Energy Savings Performance Contracts (ESPCs) Energy savings performance contracts (ESPCs) allow Federal agencies to conduct energy projects with limited to no up-front capital costs, minimizing the need for Congressional appropriations. An ESPC is a working relationship between a Federal agency and an energy service company (ESCO). The ESCO conducts a comprehensive energy audit for the Federal facility and identifies improvements to save energy. In consultation with the Federal agency, the ESCO designs and constructs a project that meets the agency's needs

400

Performance Evaluation and Quality Assurance Management during the Series Power Tests of LHC Main Lattice Magnets  

E-Print Network (OSTI)

Within the LHC magnet program a series production of superconducting dipoles and quadrupoles has recently been completed in industry and all magnets were cold tested at CERN. The main features of these magnets are: two-in-one structure, 56 mm aperture, two layer coils wound from 15.1 mm wide Nb-Ti cables, and all-polyimide insulation. This paper reviews the process of the power test quality assurance and performance evaluation, which was applied during the LHC magnet series tests. The main test results of magnets tested in both supercritical and superfluid helium, including the quench training, the conductor performance, the magnet protection efficiency and the electrical integrity are presented and discussed in terms of the design parameters and the requirements of the LHC project.

Siemko, A

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Steam Generator Management Program: Site Specific Performance Demonstration (SSPD) Version 3.0  

Science Conference Proceedings (OSTI)

The  Site Specific Performance Demonstration (SSPD) software assists in training and testing of SG eddy current personnel for the upcoming outage.  The software will help ensure that analysts have read the outage guidelines and are knowledge about the typical degradations found in the steam generator.Benefits & Value:The Pressurized Water Reactor Steam Generator Examination Guidelines, 1013706, requires steam generator analysts to pass an exam ...

2013-09-10T23:59:59.000Z

402

Sustainable Metrics for Unit Assembly Processes  

Science Conference Proceedings (OSTI)

... Sustainability, ASME sustainable processes and products, and/or ISO Technical Committee (TC) 207 on Environmental Management (http://www ...

2011-11-09T23:59:59.000Z

403

NIST Workshop on Sustainable Manufacturing: Metrics ...  

Science Conference Proceedings (OSTI)

... ICT for Design, Manufacturing and Supply chain Optimization for sustainable ... Lifecycle Management) and LCA tools to support energy and material ...

2011-10-11T23:59:59.000Z

404

Self-benchmarking Guide for Data Centers: Metrics, Benchmarks, Actions  

E-Print Network (OSTI)

Hours (full cooling) Electrical Power Chain dP1 UPS Peak20 Electrical Power ChainBenchmarking Guide 6. Electrical Power Chain Metrics ID P1

Mathew, Paul

2010-01-01T23:59:59.000Z

405

Harmonizing Global Metrics for Data Center Energy Efficiency...  

NLE Websites -- All DOE Office Websites (Extended Search)

Harmonizing Global Metrics for Data Center Energy Efficiency The United States of America, European Union and Japan Reach Agreement on Guiding Principles for Data Center Energy...

406

About nonlinear contractive conditions on cone metric spaces  

E-Print Network (OSTI)

In the present work we shall show that nonlinear contractive conditions on TVS-cone metric spaces can be reduced to nonlinear contractive conditions on usual metric spaces. Our results extend the results of Du (2010) [W.S. Du, A note on cone metric fixed point theory and its equivalence, Nonlinear Anal. 72 (2010), 2259-2261] and results of Abdeljawad and Rezapour [T. Abdeljawad, Sh. Rezapour, Some fixed point results in TVS-cone metric spaces, Fixed Point Theory (to appear 2012)].

Olaru, Ion

2011-01-01T23:59:59.000Z

407

DOE Hydrogen Analysis Repository: The Oil Security Metrics Model  

NLE Websites -- All DOE Office Websites (Extended Search)

Summary Full Title: The Oil Security Metrics Model: A Tool for Evaluating the Prospective Oil Security Benefits of DOE's Energy Efficiency and Renewable Energy Research and...

408

How Does Your Data Center Measure Up? Energy Efficiency Metrics...  

NLE Websites -- All DOE Office Websites (Extended Search)

How Does Your Data Center Measure Up? Energy Efficiency Metrics and Benchmarks for Data Center Infrastructure Systems Title How Does Your Data Center Measure Up? Energy Efficiency...

409

Harmonizing Global Metrics for Data Center Energy Efficiency...  

NLE Websites -- All DOE Office Websites (Extended Search)

expanded to provide measurement guidelines and next steps for three additional metrics; Green Energy Coefficient (GEC), Energy Reuse Factor (ERF), and Carbon Usage Effectiveness...

410

Proposed Rules Would Allow Metric Only Labeling for Some ...  

Science Conference Proceedings (OSTI)

... the FPLA to allow manufacturers to label their products with US customary units (inch/pound/pint, etc.) and metric units (centimeter/kilogram/liter, etc ...

2010-10-05T23:59:59.000Z

411

Projections of Full-Fuel-Cycle Energy and Emissions Metrics  

E-Print Network (OSTI)

2012a. “Analysis & Projections - Models & Documentation. ”Projections of Full-Fuel-Cycle Energy and Emissions MetricsGovernment purposes. Projections of Full-Fuel-Cycle Energy

Coughlin, Katie

2013-01-01T23:59:59.000Z

412

Self-benchmarking Guide for Laboratory Buildings: Metrics, Benchmarks, Actions  

E-Print Network (OSTI)

Purpose This guide describes energy efficiency metrics andEnergy Use Intensity 28 Laboratory Benchmarking Guidethe energy benchmarking approach describe in this guide can

Mathew, Paul

2010-01-01T23:59:59.000Z

413

Self-benchmarking Guide for Cleanrooms: Metrics, Benchmarks, Actions  

E-Print Network (OSTI)

Purpose This guide describes energy efficiency metrics andfor Reheat Energy Use Factor Cleanroom Benchmarking Guidethe energy benchmarking approach describe in this guide can

Mathew, Paul

2010-01-01T23:59:59.000Z

414

NIST Offers US Interpretations of Recent SI (Metric) Changes  

Science Conference Proceedings (OSTI)

... It “Americanizes” the SI to cover correct US usage of metric units, such as the accepted spelling of “meter” and “liter.” In addition, the revised guide ...

2011-10-11T23:59:59.000Z

415

NIST Offers US Interpretations of Recent SI (Metric) Changes  

Science Conference Proceedings (OSTI)

... The 2008 edition of NIST Special Publications (SP) 330, The International System of Units (SI), cover correct US usage of metric units, such as the ...

2013-04-05T23:59:59.000Z

416

Metrics and Benchmarks for Energy Efficiency in Laboratories  

NLE Websites -- All DOE Office Websites (Extended Search)

commercial buildings. These include daylight factors, illu- minance levels, lamp and ballast efficacy, lighting power density, etc. There are two key metrics for which the...

417

Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Guidance for Federal Agencies on E.O. 13514 Section 12, Federal Fleet Management, April 2010, Federal Energy Management Program (FEMP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Order 13514 Executive Order 13514 Federal Leadership in Environmental, Energy, and Economic Performance Guidance for Federal Agencies on E.O. 13514 Section 12, Federal Fleet Management April 2010 FEDERAL ENERGY MANAGEMENT PROGRAM FEDERAL ENERGY MANAGEMENT PROGRAM E.O. 13514 Section 12 Guidance Page i Contacts Amanda Sahl Federal Energy Management Program (FEMP) U.S. Department of Energy (DOE) 202-586-1662 federal_fleets@ee.doe.gov FEMP General Contact Information EE-2L 1000 Independence Avenue, SW Washington, DC 20585-0121 202-586-5772

418

Non-perturbative scalar gauge-invariant metric fluctuations from the Ponce de Leon metric in the STM theory of gravity  

E-Print Network (OSTI)

We study our non-perturbative formalism to describe scalar gauge-invariant metric fluctuations by extending the Ponce de Leon metric.

Mariano Anabitarte; Mauricio Bellini

2007-10-08T23:59:59.000Z

419

West Village Community: Quality Management Processes and Preliminary Heat Pump Water Heater Performance  

Science Conference Proceedings (OSTI)

West Village, a multi-use project underway at the University of California Davis, represents a ground-breaking sustainable community incorporating energy efficiency measures and on-site renewable generation to achieve community-level Zero Net Energy (ZNE) goals. The project when complete will provide housing for students, faculty, and staff with a vision to minimize the community's impact on energy use by reducing building energy use, providing on-site generation, and encouraging alternative forms of transportation. This focus of this research is on the 192 student apartments that were completed in 2011 under Phase I of the West Village multi-year project. The numerous aggressive energy efficiency measures implemented result in estimated source energy savings of 37% over the B10 Benchmark. There are two primary objectives of this research. The first is to evaluate performance and efficiency of the central heat pump water heaters as a strategy to provide efficient electric water heating for net-zero all-electric buildings and where natural gas is not available on site. In addition, effectiveness of the quality assurance and quality control processes implemented to ensure proper system commissioning and to meet program participation requirements is evaluated. Recommendations for improvements that could improve successful implementation for large-scale, high performance communities are identified.

Dakin, B.; Backman, C.; Hoeschele, M.; German, A.

2012-11-01T23:59:59.000Z

420

Teuchos C++ memory management classes, idioms, and related topics, the complete reference : a comprehensive strategy for safe and efficient memory management in C++ for high performance computing.  

SciTech Connect

The ubiquitous use of raw pointers in higher-level code is the primary cause of all memory usage problems and memory leaks in C++ programs. This paper describes what might be considered a radical approach to the problem which is to encapsulate the use of all raw pointers and all raw calls to new and delete in higher-level C++ code. Instead, a set of cooperating template classes developed in the Trilinos package Teuchos are used to encapsulate every use of raw C++ pointers in every use case where it appears in high-level code. Included in the set of memory management classes is the typical reference-counted smart pointer class similar to boost::shared ptr (and therefore C++0x std::shared ptr). However, what is missing in boost and the new standard library are non-reference counted classes for remaining use cases where raw C++ pointers would need to be used. These classes have a debug build mode where nearly all programmer errors are caught and gracefully reported at runtime. The default optimized build mode strips all runtime checks and allows the code to perform as efficiently as raw C++ pointers with reasonable usage. Also included is a novel approach for dealing with the circular references problem that imparts little extra overhead and is almost completely invisible to most of the code (unlike the boost and therefore C++0x approach). Rather than being a radical approach, encapsulating all raw C++ pointers is simply the logical progression of a trend in the C++ development and standards community that started with std::auto ptr and is continued (but not finished) with std::shared ptr in C++0x. Using the Teuchos reference-counted memory management classes allows one to remove unnecessary constraints in the use of objects by removing arbitrary lifetime ordering constraints which are a type of unnecessary coupling [23]. The code one writes with these classes will be more likely to be correct on first writing, will be less likely to contain silent (but deadly) memory usage errors, and will be much more robust to later refactoring and maintenance. The level of debug-mode runtime checking provided by the Teuchos memory management classes is stronger in many respects than what is provided by memory checking tools like Valgrind and Purify while being much less expensive. However, tools like Valgrind and Purify perform a number of types of checks (like usage of uninitialized memory) that makes these tools very valuable and therefore complement the Teuchos memory management debug-mode runtime checking. The Teuchos memory management classes and idioms largely address the technical issues in resolving the fragile built-in C++ memory management model (with the exception of circular references which has no easy solution but can be managed as discussed). All that remains is to teach these classes and idioms and expand their usage in C++ codes. The long-term viability of C++ as a usable and productive language depends on it. Otherwise, if C++ is no safer than C, then is the greater complexity of C++ worth what one gets as extra features? Given that C is smaller and easier to learn than C++ and since most programmers don't know object-orientation (or templates or X, Y, and Z features of C++) all that well anyway, then what really are most programmers getting extra out of C++ that would outweigh the extra complexity of C++ over C? C++ zealots will argue this point but the reality is that C++ popularity has peaked and is becoming less popular while the popularity of C has remained fairly stable over the last decade22. Idioms like are advocated in this paper can help to avert this trend but it will require wide community buy-in and a change in the way C++ is taught in order to have the greatest impact. To make these programs more secure, compiler vendors or static analysis tools (e.g. klocwork23) could implement a preprocessor-like language similar to OpenMP24 that would allow the programmer to declare (in comments) that certain blocks of code should be ''pointer-free'' or allow smaller blocks to be 'pointers allowed'. This would signific

Bartlett, Roscoe Ainsworth

2010-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

A Lightweight, High-performance I/O Management Package for Data-intensive Computing  

Science Conference Proceedings (OSTI)

Our group has been working with ANL collaborators on the topic â??bridging the gap between parallel file system and local file systemâ? during the course of this project period. We visited Argonne National Lab -- Dr. Robert Rossâ??s group for one week in the past summer 2007. We looked over our current project progress and planned the activities for the incoming years 2008-09. The PI met Dr. Robert Ross several times such as HEC FSIO workshop 08, SCâ??08 and SCâ??10. We explored the opportunities to develop a production system by leveraging our current prototype to (SOGP+PVFS) a new PVFS version. We delivered SOGP+PVFS codes to ANL PVFS2 group in 2008.We also talked about exploring a potential project on developing new parallel programming models and runtime systems for data-intensive scalable computing (DISC). The methodology is to evolve MPI towards DISC by incorporating some functions of Google MapReduce parallel programming model. More recently, we are together exploring how to leverage existing works to perform (1) coordination/aggregation of local I/O operations prior to movement over the WAN, (2) efficient bulk data movement over the WAN, (3) latency hiding techniques for latency-intensive operations. Since 2009, we start applying Hadoop/MapReduce to some HEC applications with LANL scientists John Bent and Salman Habib. Another on-going work is to improve checkpoint performance at I/O forwarding Layer for the Road Runner super computer with James Nuetz and Gary Gridder at LANL. Two senior undergraduates from our research group did summer internships about high-performance file and storage system projects in LANL since 2008 for consecutive three years. Both of them are now pursuing Ph.D. degree in our group and will be 4th year in the PhD program in Fall 2011 and go to LANL to advance two above-mentioned works during this winter break. Since 2009, we have been collaborating with several computer scientists (Gary Grider, John bent, Parks Fields, James Nunez, Hsing-Bung Chen, etc) from HPC5 and James Ahrens from Advanced Computing Laboratory in Los Alamos National Laboratory. We hold a weekly conference and/or video meeting on advancing works at two fronts: the hardware/software infrastructure of building large-scale data intensive cluster and research publications. Our group members assist in constructing several onsite LANL data intensive clusters. Two parties have been developing software codes and research papers together using both sidesâ?? resources.

Wang, Jun

2011-06-22T23:59:59.000Z

422

Federal Energy Management Program: Computerized Maintenance Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Maintenance Management Systems Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and...

423

Clean Cities 2012 Annual Metrics Report  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Energy Energy Office of Energy Efficiency & Renewable Energy Operated by the Alliance for Sustainable Energy, LLC. This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications. Contract No. DE-AC36-08GO28308 Clean Cities 2012 Annual Metrics Report Caley Johnson National Renewable Energy Laboratory Technical Report NREL/TP-5400-60274 December 2013 NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Operated by the Alliance for Sustainable Energy, LLC. This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications. Contract No. DE-AC36-08GO28308 National Renewable Energy Laboratory

424

Metrics correlation and analysis service (MCAS)  

SciTech Connect

The complexity of Grid workflow activities and their associated software stacks inevitably involves multiple organizations, ownership, and deployment domains. In this setting, important and common tasks such as the correlation and display of metrics and debugging information (fundamental ingredients of troubleshooting) are challenged by the informational entropy inherent to independently maintained and operated software components. Because such an information 'pond' is disorganized, it a difficult environment for business intelligence analysis i.e. troubleshooting, incident investigation and trend spotting. The mission of the MCAS project is to deliver a software solution to help with adaptation, retrieval, correlation, and display of workflow-driven data and of type-agnostic events, generated by disjoint middleware.

Baranovski, Andrew; Dykstra, Dave; Garzoglio, Gabriele; Hesselroth, Ted; Mhashilkar, Parag; Levshina, Tanya; /Fermilab

2009-05-01T23:59:59.000Z

425

Boundary conditions for metric fluctuations in Lifshitz  

E-Print Network (OSTI)

We consider the quantisation of linearised fluctuations of the metric and matter fields about a Lifshitz background, exploring the possibility of alternative boundary conditions, allowing the slow fall-off modes to fluctuate. We find that for $z >2$, slow fall-off modes for some of the linearised fluctuations are normalizable, which opens up the possibility of considering alternative boundary conditions. Analysing stability, we find that alternative boundary conditions for the momentum density are allowed, but alternative boundary conditions for the energy density lead to an instability of the type we recently discovered in a similar analysis for scalar fields on a fixed Lifshitz background. Our investigation is in the context of the simple massive vector model, but we would expect the conclusions to be more general.

Andrade, Tomas

2013-01-01T23:59:59.000Z

426

Failure impact analysis of key management in AMI using cybernomic situational assessment (CSA)  

Science Conference Proceedings (OSTI)

In earlier work we presented a metric that quantifies system security in terms of the average loss per unit of time incurred by a stakeholder of the system as a result of security threats. The computational infrastructure of this metric involves system ... Keywords: cyber security metrics, information security, risk management

Robert K. Abercrombie; Frederick T. Sheldon; Katie R. Hauser; Margaret W. Lantz; Ali Mili

2013-01-01T23:59:59.000Z

427

ESS 2012 Peer Review - Metrics for Storage and Pre-Standards Analyses - David Rose, SNL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metrics for Storage, an Application Model Metrics for Storage, an Application Model Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. SAND No. 2011-XXXXP Background In today's electrical power grid, energy storage devices can be utilized in 17 different applications. Some of these applications have control signals that are stochastic in nature and hence can be quantified by their statistical properties. An Auto-Regression (AR) model has been developed to extract these properties such that they can be analyzed, compared, and reproduced in laboratory testing signals.

428

Measuring savings in energy savings performance contracts using in-place energy management systems -- A case study  

SciTech Connect

Energy Management Control Systems (EMCSs) have been used in many projects as a monitoring device to provide information necessary for estimating savings from efficiency measures. This paper discusses a case study that looked in great depth at that use for evaluating savings in Energy Savings Performance Contracting (ESPC). ESPC is one of the increasingly important mechanisms for profiting from energy efficiency in commercial buildings. With ESPC, a contractor finances and installs energy-conversion measures, and the resulting savings in energy bills are shared between the contractor and the building owner. Hence, the method used for determining savings is key to the success of this financing scheme. As a part of their effort to establish measurement and verification methods, the Federal Energy Management Program (FEMP) carried out a pilot study of ESPC, and the EMCS was used in the savings verification for this ESPC contract. This case study also serves as a detailed and quantitative comparison of EMCS and conventional monitoring techniques, according to the guidelines developed in earlier work. This paper discusses the concept of different levels of monitoring savings for ESPC and presents an assessment of the use of EMCS for these levels of monitoring.

Heinemeier, K.E.; Akbari, H.; Kromer, S. [Lawrence Berkeley National Lab., CA (United States). Energy and Environment Div.

1996-08-01T23:59:59.000Z

429

CIM: A Reliable Metric for Evaluating Program Phase Classifications  

E-Print Network (OSTI)

CIM: A Reliable Metric for Evaluating Program Phase Classifications Sreekumar V. Kodakara, Jinpyo Interval of estimated Mean (CIM), a metric based on statistical sampling theory, to evaluate the quality of estimated Mean (CIM) correctly estimates the quality of phase classification with a meaningful statistical

Minnesota, University of

430

Diving decompression models and bubble metrics: Modern computer syntheses  

Science Conference Proceedings (OSTI)

A quantitative summary of computer models in diving applications is presented, underscoring dual phase dynamics and quantifying metrics in tissue and blood. Algorithms covered include the multitissue, diffusion, split phase gradient, linear-exponential, ... Keywords: Bubble metrics, Computer algorithms, Decompression models, Dive computers, Diver staging

B. R. Wienke

2009-04-01T23:59:59.000Z

431

Scalar Metric fluctuations in space time matter inflation  

E-Print Network (OSTI)

Using the Ponce de Leon background metric, which describes a 5D universe in an apparent vacuum: $\\bar{G}_{AB}=0$, we study the effective 4D evolution of both, the inflaton and gauge-invariant scalar metric fluctuations, in the recently introduced model of space time matter inflation.

Mariano Anabitarte; Mauricio Bellini

2006-05-15T23:59:59.000Z

432

Integration using invariant operators:Conformally flat radiation metrics  

E-Print Network (OSTI)

A new method is presented for obtaining the general conformally flat radiation metric by using the differential operators of Machado Ramos and Vickers (a generalisation of the GHP operators) which are invariant under null rotations and spin and boosts. The solution is found by constructing involutive tables of these derivatives applied to the quantities which arise in the Karlhede classification of metrics.

S. B. Edgar; J. A. Vickers

1998-08-05T23:59:59.000Z

433

Phantom dark energy with tachyonic instability: metric perturbations  

E-Print Network (OSTI)

We study the behavior of metric perturbations in a recently proposed model of phantom dark energy with tachyonic instability at long wavelengths. We find that metric perturbations exponentially grow in time, starting from very small values determined by vacuum fluctuations, and may become sizeable at late times. This property may be of interest for phenomenology.

S. Sergienko; V. Rubakov

2008-03-21T23:59:59.000Z

434

Metrics for Evaluating Conventional and Renewable Energy Technologies (Presentation)  

SciTech Connect

With numerous options for the future of natural gas, how do we know we're going down the right path? How do we designate a metric to measure and demonstrate change and progress, and how does that metric incorporate all stakeholders and scenarios?

Mann, M. K.

2013-01-01T23:59:59.000Z

435

Metrics for Evaluating Conventional and Renewable Energy Technologies (Presentation)  

SciTech Connect

With numerous options for the future of natural gas, how do we know we're going down the right path? How do we designate a metric to measure and demonstrate change and progress, and how does that metric incorporate all stakeholders and scenarios?

Mann, M. K.

2013-01-01T23:59:59.000Z

436

Enhanced Accident Tolerant LWR Fuels National Metrics Workshop Report  

SciTech Connect

The U.S. Department of Energy Office of Nuclear Energy (DOE-NE), in collaboration with the nuclear industry, has been conducting research and development (R&D) activities on advanced Light Water Reactor (LWR) fuels for the last few years. The emphasis for these activities was on improving the fuel performance in terms of increased burnup for waste minimization and increased power density for power upgrades, as well as collaborating with industry on fuel reliability. After the events at the Fukushima Nuclear Power Plant in Japan in March 2011, enhancing the accident tolerance of LWRs became a topic of serious discussion. In the Consolidated Appropriations Act, 2012, Conference Report 112-75, the U.S. Congress directed DOE-NE to: • Give “priority to developing enhanced fuels and cladding for light water reactors to improve safety in the event of accidents in the reactor or spent fuel pools.” • Give “special technical emphasis and funding priority…to activities aimed at the development and near-term qualification of meltdown-resistant, accident-tolerant nuclear fuels that would enhance the safety of present and future generations of light water reactors.” • Report “to the Committee, within 90 days of enactment of this act, on its plan for development of meltdown-resistant fuels leading to reactor testing and utilization by 2020.” Fuels with enhanced accident tolerance are those that, in comparison with the standard UO2-zirconium alloy system currently used by the nuclear industry, can tolerate loss of active cooling in the reactor core for a considerably longer time period (depending on the LWR system and accident scenario) while maintaining or improving the fuel performance during normal operations, and operational transients, as well as design-basis and beyond design-basis events. The overall draft strategy for development and demonstration is comprised of three phases: Feasibility Assessment and Down-selection; Development and Qualification; and Commercialization. The activities performed during the feasibility assessment phase include laboratory scale experiments; fuel performance code updates; and analytical assessment of economic, operational, safety, fuel cycle, and environmental impacts of the new concepts. The development and qualification stage will consist of fuel fabrication and large scale irradiation and safety basis testing, leading to qualification and ultimate NRC licensing of the new fuel. The commercialization phase initiates technology transfer to industry for implementation. Attributes for fuels with enhanced accident tolerance include improved reaction kinetics with steam and slower hydrogen generation rate, while maintaining acceptable cladding thermo-mechanical properties; fuel thermo-mechanical properties; fuel-clad interactions; and fission-product behavior. These attributes provide a qualitative guidance for parameters that must be considered in the development of fuels and cladding with enhanced accident tolerance. However, quantitative metrics must be developed for these attributes. To initiate the quantitative metrics development, a Light Water Reactor Enhanced Accident Tolerant Fuels Metrics Development Workshop was held October 10-11, 2012, in Germantown, Maryland. This document summarizes the structure and outcome of the two-day workshop. Questions regarding the content can be directed to Lori Braase, 208-526-7763, lori.braase@inl.gov.

Lori Braase

2013-01-01T23:59:59.000Z

437

Performance-Based Environmental Restoration Management Assessment (PERMA): Applying Decision Analysis to Implement Achievable Response-Action Completion Plans  

E-Print Network (OSTI)

Guide is being issued by the Defense Logistics Agency (DLA) to clarify the requirements for implementing the Defense Environmental Restoration Program (DERP) at DLA installations. This Guide reflects DLA’s continuing commitment to demonstrate and achieve protectiveness and to meet necessary, feasible, and reasonable environmental response-action obligations in the most effective and efficient manner possible. This Performance-Based Environmental Restoration Management Assessment (PERMA) Guide is designed to assist DLA environmental project teams to achieve response complete in a reasonable timeframe, while maintaining protectiveness of human health and the environment. DLA issues this Guide also to clarify and stress the importance of remedy planning and optimization activities in establishing, reducing, and validating the annual environmental liability statement. The Guide reviews how to establish realistic and achievable performance objectives by taking advantage of the flexibility inherent in the DERP Guidance and the iterative nature of the cleanup program (i.e., fiveyear review process), as directed under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (as amended). Improving scientific and technical knowledge can and should be routinely integrated into the response-action planning and implementation process to ensure that the best responses are used to feasibly and reasonably achieve and efficiently sustain necessary protection.

unknown authors

2004-01-01T23:59:59.000Z

438

Repository performance confirmation.  

SciTech Connect

Repository performance confirmation links the technical bases of repository science and societal acceptance. This paper explores the myriad aspects of what has been labeled performance confirmation in U.S. programs, which involves monitoring as a collection of distinct activities combining technical and social significance in radioactive waste management. This paper is divided into four parts: (1) A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives; (2) A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain; (3) A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant; and (4) An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. A fundamental consideration is the differentiation of confirmation monitoring from the many other testing and monitoring activities. Recently, the license application for Yucca Mountain provided a case study including a technical process for meeting regulatory requirements to confirm repository performance as well as considerations related to the preservation of retrievability. The performance confirmation plan developed as part of the Yucca Mountain license application identified a broad suite of monitoring activities. A revision of the plan was expected to winnow the number of activities down to a manageable size. As a result, an objective process for the next stage of performance confirmation planning was developed as an integral part of an overarching long-term testing and monitoring strategy. The Waste Isolation Pilot Plant compliance monitoring program at once reflects its importance to stakeholders while demonstrating adequate understanding of relevant monitoring parameters. The compliance criteria were stated by regulation and are currently monitored as part of the regulatory rule for disposal. At the outset, the screening practice and parameter selection were not predicated on a direct or indirect correlation to system performance metrics, as was the case for Yucca Mountain. Later on, correlation to performance was established, and the Waste Isolation Pilot Plant continues to monitor ten parameters originally identified in the compliance certification documentation. The monitoring program has proven to be effective for the technical intentions and societal or public assurance. The experience with performance confirmation in the license application process for Yucca Mountain helped identify an objective, quantitative methodology for this purpose. Revision of the existing plan would be based on findings of the total system performance assessment. Identification and prioritization of confirmation activities would then derive from performance metrics associated with performance assessment. Given the understanding of repository performance confirmation, as reviewed in this paper, it is evident that the performance confirmation program for the Yucca Mountain project could be readily re-engaged if licensing activities resumed.

Hansen, Francis D.

2011-09-01T23:59:59.000Z

439

Overcoming the l1 non-embeddability barrier: algorithms for product metrics  

Science Conference Proceedings (OSTI)

A common approach for solving computational problems over a difficult metric space is to embed the "hard" metric into L1 which admits efficient algorithms and is thus considered an "easy" metric. This approach has proved successful ...

Alexandr Andoni; Piotr Indyk; Robert Krauthgamer

2009-01-01T23:59:59.000Z

440

Evaluating N-gram based evaluation metrics for automatic keyphrase extraction  

Science Conference Proceedings (OSTI)

This paper describes a feasibility study of n-gram-based evaluation metrics for automatic keyphrase extraction. To account for near-misses currently ignored by standard evaluation metrics, we adapt various evaluation metrics developed for machine ...

Su Nam Kim; Timothy Baldwin; Min-Yen Kan

2010-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Weighting and Bayes Nets for Rollup of Surveillance Metrics  

SciTech Connect

The LANL IKE team proposes that the surveillance metrics for several data stream that are used to detect the same failure mode be weighted. Similarly, the failure mode metrics are weighted to obtain a subsystem metric. E.g., if there n data streams (nodes 1-n), the failure mode (node 0) metric is obtained as M{sub 0} = w{sub 1}M{sub 1} + {hor_ellipsis} + w{sub n}M{sub n}, where {Sigma}{sub i=1}{sup n} w{sub i} = 1. This proposal has been implemented with Bayes Nets using the Netica/IKE software by specifying an appropriate conditional probability table (CPT). This CPT is calculated using the same form as (1), where the data stream metrics for the true (T) and false (F) states are replaced by 1 and 0, respectively. Then using this CPT, the failure mode metric calculated by Netica/IKE equals (1). This result has two nice features. First, the rollup Bayes nets is doing can be easily explained. Second, because Bayes Nets can implement this rollup using Netica/IKE, then data marshalling (allocating next year's budget) can be studied. A proof that the claim 'failure mode metric calculated by Netica/IKE equals (1)' for n = 2 and n = 3 follows as well as the sketch of a proof by induction for general n.

Henson, Kriste [Los Alamos National Laboratory; Sentz, Kari [Los Alamos National Laboratory; Hamada, Michael [Los Alamos National Laboratory

2012-04-30T23:59:59.000Z

442

Monitoring informs management  

SciTech Connect

Improved regional monitoring and reporting of greenhouse-gas emissions depends on accurate estimates of emissions from different land-use regimes. An analysis suggests that measuring emissions per crop yield may be an optimum metric for refining land-management decisions.

West, Tristram O.

2011-10-24T23:59:59.000Z

443

Cray T3E Performances of a Parallel Code for a Stochastic Dynamic Assets and Liabilities Management Model  

Science Conference Proceedings (OSTI)

A parallel Asset & Liability Management (ALM) code was developed by SMART and Prometeia Calcolo for the EC project PALMA (Parallel Asset and Liability MAnagement). The code implements a stochastic approach based on a dynamic ALM model specially tailored ...

G. Zanghirati; F. Cocco; F. Taddei; G. Paruolo

1999-08-01T23:59:59.000Z

444

Sandia National Laboratories performance assessment methodology for long-term environmental programs : the history of nuclear waste management.  

SciTech Connect

Sandia National Laboratories (SNL) is the world leader in the development of the detailed science underpinning the application of a probabilistic risk assessment methodology, referred to in this report as performance assessment (PA), for (1) understanding and forecasting the long-term behavior of a radioactive waste disposal system, (2) estimating the ability of the disposal system and its various components to isolate the waste, (3) developing regulations, (4) implementing programs to estimate the safety that the system can afford to individuals and to the environment, and (5) demonstrating compliance with the attendant regulatory requirements. This report documents the evolution of the SNL PA methodology from inception in the mid-1970s, summarizing major SNL PA applications including: the Subseabed Disposal Project PAs for high-level radioactive waste; the Waste Isolation Pilot Plant PAs for disposal of defense transuranic waste; the Yucca Mountain Project total system PAs for deep geologic disposal of spent nuclear fuel and high-level radioactive waste; PAs for the Greater Confinement Borehole Disposal boreholes at the Nevada National Security Site; and PA evaluations for disposal of high-level wastes and Department of Energy spent nuclear fuels stored at Idaho National Laboratory. In addition, the report summarizes smaller PA programs for long-term cover systems implemented for the Monticello, Utah, mill-tailings repository; a PA for the SNL Mixed Waste Landfill in support of environmental restoration; PA support for radioactive waste management efforts in Egypt, Iraq, and Taiwan; and, most recently, PAs for analysis of alternative high-level radioactive waste disposal strategies including repositories deep borehole disposal and geologic repositories in shale and granite. Finally, this report summarizes the extension of the PA methodology for radioactive waste disposal toward development of an enhanced PA system for carbon sequestration and storage systems. These efforts have produced a generic PA methodology for the evaluation of waste management systems that has gained wide acceptance within the international community. This report documents how this methodology has been used as an effective management tool to evaluate different disposal designs and sites; inform development of regulatory requirements; identify, prioritize, and guide research aimed at reducing uncertainties for objective estimations of risk; and support safety assessments.

Marietta, Melvin Gary; Anderson, D. Richard; Bonano, Evaristo J.; Meacham, Paul Gregory (Raytheon Ktech, Albuquerque, NM)

2011-11-01T23:59:59.000Z

445

In the OSTI Collections: High-Performance Computing | OSTI, US...  

Office of Scientific and Technical Information (OSTI)

Sandia National Laboratories in the report "Toward a New Metric for Ranking High Performance Computing Systems" SciTech Connect, which describes a new benchmark that represents...

446

Effects of Metal Hydride Properties on the Performance of Hydrogen ...  

Science Conference Proceedings (OSTI)

Sep 16, 2007 ... Volumetric and gravimetric energy density are the primary performance metrics for the evaluation of automotive hydrogen storage systems.

447

Relationships among Non-Academic Employee Perceptions of Manager Leadership Behaviors, Meaningful Work, and Selected Performance Drivers  

E-Print Network (OSTI)

U.S. public institutions of higher education are unique work environments that employ millions of faculty, staff, and administrators. Reported research on human resource issues for non-academic employees within higher education, however, is scarce. Given that staff who work in higher education are increasingly being asked to perform at higher levels with equal or fewer resources, research is needed as to how these outcomes can be achieved. The purpose of this study was to determine to what extent non-academic middle manager participative and supportive leadership behaviors are related to employee perceptions of meaningful work (conceptualized as growth satisfaction, empowerment, person-job fit, and affiliation commitment) and to employee learning goal orientation, organizational citizenship behavior, and intention to turnover. A population of 4,235 employees within a large public institution of higher education in the southwestern part of the United States was asked to participate in an online survey. The survey was comprised of items from eight validated instruments with 45 items and additional demographic information. Respondents totaled 1,333 (31.5%). Data were analyzed using descriptive statistics, Cronbach’s alpha coefficient for reliability, exploratory factor analysis, and structural equation modeling techniques. Results of the study led to revisions of the initially proposed constructs via exploratory factor analysis, giving rise to seven constructs: Cooperative Leader Behavior, Work Fulfillment and Identity, Work Influence and Affiliation, Learning Goal Orientation, Personal Industry, Interpersonal Helping, and Intention to Turnover. Evaluation of the structural model for the revised constructs, with one added path, resulted in good fit (chi^2=3246.397 [796]=4.078, p=.000; CFI=.941; TLI=.936; RMSEA .048; SRMR=.051). Cooperative Leader Behavior was significantly and positively related to employee perceptions of Work Fulfillment and Identity (beta=.517, p<.05) and Work Influence and Affiliation (beta=.643, p<.05). Cooperative Leader Behavior, Work Fulfillment and Identity, and Work Influence and Affiliation were significantly and negatively related to Intention to Turnover (beta=-.436, p<.05; beta=-.480, p<.05; beta=-.293, p<.05, respectively). Work Fulfillment and Identity was significantly and positively related to Learning Goal Orientation (beta=.261, p<.05) and Personal Industry (beta=.309, p<.05). Work Influence and Affiliation was significantly and positively related to Interpersonal Helping (beta=.274, p<.05). Finally, Work Fulfillment and Identity and Work Influence and Affiliation had a significant bi-directional relationship (beta=.848, p<.05). Conclusions drawn from the results of this study led to, 1) recommendations and implications for the training and development of middle managers, 2) recommendations and implications for theory and research, and 3) recommendations and implications for practice. Higher education institutions that desire to foster employee perceptions of meaningful work and influence performance drivers such as intention to turnover should focus on developing middle-manager cooperative leadership behaviors. Additional research is needed to continue to revise, refine and validate the new constructs identified in this study, as well as to identify additional performance drivers in higher education responsive to cooperative leader behavior.

Hammons, Laura

2013-08-01T23:59:59.000Z

448

Measuring solar reflectance-Part I: Defining a metric that accurately...  

NLE Websites -- All DOE Office Websites (Extended Search)

I: Defining a metric that accurately predicts solar heat gain Title Measuring solar reflectance-Part I: Defining a metric that accurately predicts solar heat gain Publication Type...

449

Result Summary for the Area 5 Radioactive Waste Management Site Performance Assessment Model Version 4.110  

SciTech Connect

Results for Version 4.110 of the Area 5 Radioactive Waste Management Site (RWMS) performance assessment (PA) model are summarized. Version 4.110 includes the fiscal year (FY) 2010 inventory estimate, including a future inventory estimate. Version 4.110 was implemented in GoldSim 10.11(SP4). The following changes have been implemented since the last baseline model, Version 4.105: (1) Updated the inventory and disposal unit configurations with data through the end of FY 2010. (1) Implemented Federal Guidance Report 13 Supplemental CD dose conversion factors (U.S. Environmental Protection Agency, 1999). Version 4.110 PA results comply with air pathway and all-pathways annual total effective dose (TED) performance objectives (Tables 2 and 3, Figures 1 and 2). Air pathways results decrease moderately for all scenarios. The time of the maximum for the air pathway open rangeland scenario shifts from 1,000 to 100 years (y). All-pathways annual TED increases for all scenarios except the resident scenario. The maximum member of public all-pathways dose occurs at 1,000 y for the resident farmer scenario. The resident farmer dose was predominantly due to technetium-99 (Tc-99) (82 percent) and lead-210 (Pb-210) (13 percent). Pb-210 present at 1,000 y is produced predominantly by radioactive decay of uranium-234 (U-234) present at the time of disposal. All results for the postdrilling and intruder-agriculture scenarios comply with the performance objectives (Tables 4 and 5, Figures 3 and 4). The postdrilling intruder results are similar to Version 4.105 results. The intruder-agriculture results are similar to Version 4.105, except for the Pit 6 Radium Disposal Unit (RaDU). The intruder-agriculture result for the Shallow Land Burial (SLB) disposal units is a significant fraction of the performance objective and exceeds the performance objective at the 95th percentile. The intruder-agriculture dose is due predominantly to Tc-99 (75 percent) and U-238 (9.5 percent). The acute intruder scenario results comply with all performance objectives (Tables 6 and 7, Figures 5 and 6). The acute construction result for the SLB disposal units decreases significantly with this version. The maximum acute intruder dose occurs at 1,000 y for the SLB disposal units under the acute construction scenario. The acute intruder dose is caused by multiple radionuclides including U-238 (31 percent), Th-229 (28 percent), plutonium-239 (8.6 percent), U-233 (7.8 percent), and U-234 (6.7 percent). All results for radon-222 (Rn-222) flux density comply with the performance objective (Table 8, Figure 7). The mean Pit 13 RaDU flux density is close to the 0.74 Bq m{sup -2} s{sup -1} limit.

NSTec Environmental Management

2011-07-20T23:59:59.000Z

450

PERFORMANCE ASSESSMENT TO SUPPORT CLOSURE OF SINGLE-SHELL TANK WASTE MANAGEMENT AREA C AT THE HANFORD SITE  

Science Conference Proceedings (OSTI)

Current proposed regulatory agreements (Consent Decree) at the Hanford Site call for closure of the Single-Shell Tank (SST) Waste Management Area (WMA) C in the year 2019. WMA C is part of the SST system in 200 East area ofthe Hanford Site and is one of the first tank farm areas built in mid-1940s. In order to close WMA C, both tank and facility closure activities and corrective actions associated with existing soil and groundwater contamination must be performed. Remedial activities for WMA C and corrective actions for soils and groundwater within that system will be supported by various types of risk assessments and interim performance assessments (PA). The U.S. Department of Energy, Office of River Protection (DOE-ORP) and the State ofWashington Department of Ecology (Ecology) are sponsoring a series of working sessions with regulators and stakeholders to solicit input and to obtain a common understanding concerning the scope, methods, and data to be used in the planned risk assessments and PAs to support closure of WMA C. In addition to DOE-ORP and Ecology staff and contractors, working session members include representatives from the U.S. Enviromnental Protection Agency, the U.S. Nuclear Regulatory Commission (NRC), interested tribal nations, other stakeholders groups, and members of the interested public. NRC staff involvement in the working sessions is as a technical resource to assess whether required waste determinations by DOE for waste incidental to reprocessing are based on sound technical assumptions, analyses, and conclusions relative to applicable incidental waste criteria.

BERGERON MP

2010-01-14T23:59:59.000Z

451

Line Management Understanding of QA and Oversight | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

work being done correctly, timely, and safely. Input could be from recent assessments, trends, Performance Metrics, number of open action items, recurring issues, etc. Line...

452

Metrics of Software Evolution as Effort Predictors - A Case Study  

Science Conference Proceedings (OSTI)

Despite its importance, cost estimation in the context of continuing software evolution has been relatively unexplored. This paper addresses this omission by describing some models that predict effort as a function of a suite of metrics of software evolution. ...

Juan F. Ramil; Meir M. Lehman

2000-10-01T23:59:59.000Z

453

Islands of Reliability for Hybrid Topological-Metric Mapping  

E-Print Network (OSTI)

Islands of Reliability for Hybrid Topological-Metric Mapping Shlomo Saul Simhon TR-CIM-99-6319 Telex: 05 268510 FAX: (514) 398-7348 Email: cim@cim.mcgill.ca #12;ABSTRACT This thesis describes

Dudek, Gregory

454

Analyses Of Two End-User Software Vulnerability Exposure Metrics  

SciTech Connect

The risk due to software vulnerabilities will not be completely resolved in the near future. Instead, putting reliable vulnerability measures into the hands of end-users so that informed decisions can be made regarding the relative security exposure incurred by choosing one software package over another is of importance. To that end, we propose two new security metrics, average active vulnerabilities (AAV) and vulnerability free days (VFD). These metrics capture both the speed with which new vulnerabilities are reported to vendors and the rate at which software vendors fix them. We then examine how the metrics are computed using currently available datasets and demonstrate their estimation in a simulation experiment using four different browsers as a case study. Finally, we discuss how the metrics may be used by the various stakeholders of software and to software usage decisions.

Jason L. Wright; Miles McQueen; Lawrence Wellman

2012-08-01T23:59:59.000Z

455

Modified gravity from the quantum part of the metric  

E-Print Network (OSTI)

It is shown that if a metric in quantum gravity can be decomposed as a sum of classical and quantum parts then Einstein quantum gravity looks approximately like modified gravity with a nonminimal interaction between gravity and matter.

Vladimir Dzhunushaliev; Vladimir Folomeev; Burkhard Kleihaus; Jutta Kunz

2013-12-01T23:59:59.000Z

456

Generalized Banach contraction in probabilistic metric/normed spaces  

E-Print Network (OSTI)

In this paper, we present the generalization of B-contraction and C-contraction due to Sehgal and Hicks respectively. We also study some properties of C-contraction in probabilistic metric space.

Lafuerza-Guillen, Bernardo

2007-01-01T23:59:59.000Z

457

Issues and Uncertainties Affecting Metrics for Aviation Impacts on Climate  

Science Conference Proceedings (OSTI)

Metrics such as radiative forcing and global warming potential have proven to be useful tools in climate policy–related studies, including evaluation of the effects of aviation on climate, to relate different emissions to one another in order to ...

Don Wuebbles; Piers Forster; Helen Rogers; Redina Herman

2010-04-01T23:59:59.000Z

458

Nonlinear Gravity Theories in the Metric and Palatini Formalisms  

E-Print Network (OSTI)

We study nonlinear gravity theories in both the metric and the Palatini (metric-affine) formalisms. The nonlinear character of the gravity lagrangian in the metric formalism causes the appearance of a scalar source of matter in Einstein’s equations that can be interpreted as a quintessence field. However, in the Palatini case no new energy sources appear, though the equations of motion get modified in such a way that usual matter can lead to repulsive gravity at very low densities. Thus, the Palatini formalism could provide a mechanism to explain the recent acceleration of the universe without the necessity of dark energy sources. We also show that in contrast to the metric formalism where only the Einstein frame should be considered as physical, the Palatini formalism allows both the Einstein and the Jordan frames to be physically acceptable.

Gonzalo J. Olmo A; William Komp A

2004-01-01T23:59:59.000Z

459

Nonlinear Gravity Theories in the Metric and Palatini Formalisms  

E-Print Network (OSTI)

We study nonlinear gravity theories in both the metric and the Palatini (metric-affine) formalisms. The nonlinear character of the gravity lagrangian in the metric formalism causes the appearance of a scalar source of matter in Einstein's equations that can be interpreted as a quintessence field. However, in the Palatini case no new energy sources appear, though the equations of motion get modified in such a way that usual matter can lead to repulsive gravity at very low densities. Thus, the Palatini formalism could provide a mechanism to explain the recent acceleration of the universe without the necessity of dark energy sources. We also show that in contrast to the metric formalism where only the Einstein frame should be considered as physical, the Palatini formalism allows both the Einstein and the Jordan frames to be physically acceptable.

Gonzalo J. Olmo; William Komp

2004-03-22T23:59:59.000Z

460

Towards Efficient Supercomputing: Searching for the Right Efficiency Metric  

Science Conference Proceedings (OSTI)

The efficiency of supercomputing has traditionally been in the execution time. In early 2000 s, the concept of total cost of ownership was re-introduced, with the introduction of efficiency measure to include aspects such as energy and space. Yet the supercomputing community has never agreed upon a metric that can cover these aspects altogether and also provide a fair basis for comparison. This paper exam- ines the metrics that have been proposed in the past decade, and proposes a vector-valued metric for efficient supercom- puting. Using this metric, the paper presents a study of where the supercomputing industry has been and how it stands today with respect to efficient supercomputing.

Hsu, Chung-Hsing [ORNL; Kuehn, Jeffery A [ORNL; Poole, Stephen W [ORNL

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Applying Software Engineering Metrics to Land Surface Parameterization Schemes  

Science Conference Proceedings (OSTI)

In addition to model validation techniques and intermodel comparison projects, the authors propose the use of software engineering metrics as an additional tool for the enhancement of “quality” in climate models. By discriminating between ...

A. Henderson-Sellers; A. J. Pitman; B. Henderson-Sellers; D. Pollard; J. M. Verner

1995-05-01T23:59:59.000Z

462

PARABOLIC COMPARISON PRINCIPLE AND QUASIMINIMIZERS IN METRIC MEASURE SPACES  

E-Print Network (OSTI)

PARABOLIC COMPARISON PRINCIPLE AND QUASIMINIMIZERS IN METRIC MEASURE SPACES JUHA KINNUNEN AND MATHIAS MASSON Abstract. We give several characterizations of parabolic (quasisuper)- minimizers prove a version of com- parison principle for super- and subminimizers on parabolic space-time cylinders

Kinnunen, Juha

463

Analysis of Solar Cell Quality Using Voltage Metrics: Preprint  

DOE Green Energy (OSTI)

The highest efficiency solar cells provide both excellent voltage and current. Of these, the open-circuit voltage (Voc) is more frequently viewed as an indicator of the material quality. However, since the Voc also depends on the band gap of the material, the difference between the band gap and the Voc is a better metric for comparing material quality of unlike materials. To take this one step further, since Voc also depends on the shape of the absorption edge, we propose to use the ultimate metric: the difference between the measured Voc and the Voc calculated from the external quantum efficiency using a detailed balance approach. This metric is less sensitive to changes in cell design and definition of band gap. The paper defines how to implement this metric and demonstrates how it can be useful in tracking improvements in Voc, especially as Voc approaches its theoretical maximum.

Toberer, E. S.; Tamboli, A. C.; Steiner, M.; Kurtz, S.

2012-06-01T23:59:59.000Z

464

Characterizing Application Runtime Behavior from System Logs and Metrics  

Science Conference Proceedings (OSTI)

Large-scale systems are heavily shared resource environments where a mix of applications are launched concurrently competing for network and storage resources. It is essential to characterize the runtime behavior of these applications for provisioning system resources and understanding the impact of application s performance when competing for resources. In this paper, we study the use of zero- and low-overhead system logs and other system metric data for characterizing the runtime behavior of several applications. We present our preliminary work on estimating individual application s I/O demands by observing file system usage pattern over multiple runs, and interpreting application s network utilization characteristics by observing link-layer error logs. We also present preliminary findings on using such information in making context-sensitive scheduling decisions that minimize potentially negative interactions between applications competing for shared resources. Our analysis is based on four months of system log data collected on one of the world s largest supercomputing facilities, the Jaguar XT5 petaflop system at Oak Ridge National Laboratory.

Gunasekaran, Raghul [ORNL; Dillow, David A [ORNL; Shipman, Galen M [ORNL; Vuduc, Richard [Georgia Institute of Technology; Chow, Edmond [Georgia Institute of Technology

2011-01-01T23:59:59.000Z

465

Schwarzschild-de Sitter Metric and Inertial Beltrami Coordinates  

E-Print Network (OSTI)

Under consideration of coordinate conditions, we get the Schwarzschild-Beltrami-de Sitter (S-BdS) metric solution of the Einstein field equations with a cosmological constant $\\Lambda$. A brief review to the de Sitter invariant special relativity (dS-SR), and de Sitter general relativity (dS-GR, or GR with a $\\Lambda$) is presented. The Beltrami metric $B_{\\mu\

Li-Feng Sun; Mu-Lin Yan; Ya Deng; Wei Huang; Sen Hu

2013-08-23T23:59:59.000Z

466

Marketplace Assessment – Metric Labeling on Packages in ...  

Science Conference Proceedings (OSTI)

... Harbor Freight Devcon 5 Minute Epoxy 2 ITW Performance Riviera Beach, FL 1 net ... Harbor Freight Aquapel Glass Treatment 2 PPG Industries, Inc. ...

2010-07-27T23:59:59.000Z

467

Designing and Implementing Effective Performance Assurance Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 12 Ed Anderson, PE CEM FPL Federal Sales Manager  Part of the NextEra Energy family  NextEra Energy Resources  FPL Energy Solutions  GEXA  FPL (Utility)  3rd largest investor-owned utility  Typically #1 or 2 in Energy Efficiency (DSM programs)  Lowest Electric Rates in the State (25% lower than National Average)  In 2010, commissioned Nation's largest PV plant and the first solar preheat fossil plant.  Completed 50 UESC projects since 1995  First Basic Ordering Agreement (BOA) in the Nation  Seven different agencies ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? Based on demonstrating the performance of the installed equipment and systems. The Statement of Work includes equipment and system performance metrics and measuring

468

Frontier-based performance analysis models for supply chain management: State of the art and research directions  

Science Conference Proceedings (OSTI)

Effective supply chain management relies on information integration and implementation of best practice techniques across the chain. Supply chains are examples of complex multi-stage systems with temporal and causal interrelations, operating multi-input ... Keywords: Bi-level programming, Data envelopment analysis, Game theory, Supply chain management, Two-stage process

Per J. Agrell, Adel Hatami-Marbini

2013-11-01T23:59:59.000Z

469

Simulation information regarding Sandia National Laboratories%3CU%2B2019%3E trinity capability improvement metric.  

SciTech Connect

Sandia National Laboratories, Los Alamos National Laboratory, and Lawrence Livermore National Laboratory each selected a representative simulation code to be used as a performance benchmark for the Trinity Capability Improvement Metric. Sandia selected SIERRA Low Mach Module: Nalu, which is a uid dynamics code that solves many variable-density, acoustically incompressible problems of interest spanning from laminar to turbulent ow regimes, since it is fairly representative of implicit codes that have been developed under ASC. The simulations for this metric were performed on the Cielo Cray XE6 platform during dedicated application time and the chosen case utilized 131,072 Cielo cores to perform a canonical turbulent open jet simulation within an approximately 9-billion-elementunstructured- hexahedral computational mesh. This report will document some of the results from these simulations as well as provide instructions to perform these simulations for comparison.

Agelastos, Anthony Michael; Lin, Paul T.

2013-10-01T23:59:59.000Z

470

Exploration Cost and Time Metric | Open Energy Information  

Open Energy Info (EERE)

Exploration Cost and Time Metric Exploration Cost and Time Metric Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Exploration Cost and Time Metric Agency/Company /Organization: NREL Sector: Energy Focus Area: Geothermal Phase: Prepare a Plan Topics: Background analysis, Baseline projection, Resource assessment Resource Type: Application prototype, Online calculator User Interface: Website Website: openei.org/apps/xct_metric/ Country: United States Web Application Link: openei.org/apps/xct_metric/ Cost: Free OpenEI Keyword(s): Featured UN Region: Northern America Coordinates: 37.09024°, -95.712891° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.09024,"lon":-95.712891,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

471

How Good Is Good: Improved Tracking and Managing of Safety Goals, Performance Indicators, Production Targets and Significant Events Using Learning Curves  

SciTech Connect

We show a new way to track and measure safety and performance using learning curves derived on a mathematical basis. When unusual or abnormal events occur in plants and equipment, the regulator and good management practice requires they be reported, investigated, understood and rectified. In addition to reporting so-called 'significant events', both management and the regulator often set targets for individual and collective performance, which are used for both reward and criticism. For almost completely safe systems, like nuclear power plants, commercial aircraft and chemical facilities, many parameters are tracked and measured. Continuous improvement has to be demonstrated, as well as meeting reduced occurrence rates, which are set as management goals or targets. This process usually takes the form of statistics for availability of plant and equipment, forced or unplanned maintenance outage, loss of safety function, safety or procedural violations, etc. These are often rolled up into a set of so-called 'Performance Indicators' as measures of how well safety and operation is being managed at a given facility. The overall operating standards of an industry are also measured. A whole discipline is formed of tracking, measuring, reporting, managing and understanding the plethora of indicators and data. Decreasing occurrence rates and meeting or exceeding goals are seen and rewarded as virtues. Managers and operators need to know how good is their safety management system that has been adopted and used (and paid for), and whether it can itself be improved. We show the importance of accumulated experience in correctly measuring and tracking the decreasing event and error rates speculating a finite minimum rate. We show that the rate of improvement constitutes a measurable 'learning curve', and the attainment of the goals and targets can be affected by the adopted measures. We examine some of the available data on significant events, reportable occurrences, and loss of availability. We suggest the use of learning curves as a means of accurately tracking progress; and stress the importance of a sustained learning environment in performance improvement. (authors)

Duffey, Rommey B. [Atomic Energy of Canada Limited, Chalk River, ON KOJ 1J0 (Canada); Saull, John W. [International Federation of Airworthiness, East Grinstead, RH19 3RF (United Kingdom)

2002-07-01T23:59:59.000Z

472

Property:ExplorationCostPerMetric | Open Energy Information  

Open Energy Info (EERE)

ExplorationCostPerMetric ExplorationCostPerMetric Jump to: navigation, search Property Name ExplorationCostPerMetric Property Type String Description the unit ratio denominator for exploration cost Allows Values 100 feet cut;30 foot core;compound;day;element;foot;hour;mile;point;process;sample;sq. mile;station;Subject;well Subproperties This property has the following 107 subproperties: A Active Seismic Methods Active Seismic Techniques Active Sensors Analytical Modeling B Borehole Seismic Techniques C Cation Geothermometers Chemical Logging Conceptual Model Core Holes Cross-Dipole Acoustic Log D DC Resistivity Survey (Dipole-Dipole Array) DC Resistivity Survey (Mise-Á-La-Masse) DC Resistivity Survey (Pole-Dipole Array) DC Resistivity Survey (Schlumberger Array) DC Resistivity Survey (Wenner Array)

473

Property:ExplorationTimePerMetric | Open Energy Information  

Open Energy Info (EERE)

ExplorationTimePerMetric ExplorationTimePerMetric Jump to: navigation, search Property Name ExplorationTimePerMetric Property Type String Description the unit ratio denominator for exploration time Allows Values job;10 mile;10 stn;100 mile;sq. mile;foot Subproperties This property has the following 121 subproperties: A Active Seismic Methods Active Seismic Techniques Active Sensors Analytical Modeling B Borehole Seismic Techniques C Cation Geothermometers Chemical Logging Compound and Elemental Analysis Conceptual Model Core Holes Cross-Dipole Acoustic Log D DC Resistivity Survey (Dipole-Dipole Array) DC Resistivity Survey (Mise-Á-La-Masse) DC Resistivity Survey (Pole-Dipole Array) DC Resistivity Survey (Schlumberger Array) DC Resistivity Survey (Wenner Array) Data Collection and Mapping Data Techniques

474

Metrics for Evaluating the Accuracy of Solar Power Forecasting: Preprint  

Science Conference Proceedings (OSTI)

Forecasting solar energy generation is a challenging task due to the variety of solar power systems and weather regimes encountered. Forecast inaccuracies can result in substantial economic losses and power system reliability issues. This paper presents a suite of generally applicable and value-based metrics for solar forecasting for a comprehensive set of scenarios (i.e., different time horizons, geographic locations, applications, etc.). In addition, a comprehensive framework is developed to analyze the sensitivity of the proposed metrics to three types of solar forecasting improvements using a design of experiments methodology, in conjunction with response surface and sensitivity analysis methods. The results show that the developed metrics can efficiently evaluate the quality of solar forecasts, and assess the economic and reliability impact of improved solar forecasting.

Zhang, J.; Hodge, B. M.; Florita, A.; Lu, S.; Hamann, H. F.; Banunarayanan, V.

2013-10-01T23:59:59.000Z

475

Primer Control System Cyber Security Framework and Technical Metrics  

Science Conference Proceedings (OSTI)

The Department of Homeland Security National Cyber Security Division supported development of a control system cyber security framework and a set of technical metrics to aid owner-operators in tracking control systems security. The framework defines seven relevant cyber security dimensions and provides the foundation for thinking about control system security. Based on the developed security framework, a set of ten technical metrics are recommended that allow control systems owner-operators to track improvements or degradations in their individual control systems security posture.

Wayne F. Boyer; Miles A. McQueen

2008-05-01T23:59:59.000Z

476

Inhomogeneous parabolic equations on unbounded metric measure spaces  

E-Print Network (OSTI)

We study inhomogeneous semilinear parabolic equations with source term f independent of time u_{t}={\\Delta}u+u^{p}+f(x) on a metric measure space, subject to the conditions that f(x)\\geq 0 and u(0,x)=\\phi(x)\\geq 0. By establishing Harnack-type inequalities in time t and some powerful estimates, we give sufficient conditions for non-existence, local existence, and global existence of weak solutions. This paper generalizes previous results on Euclidean spaces to general metric measure spaces.

Kenneth J. Falconer; Jiaxin Hu; Yuhua Sun

2011-03-29T23:59:59.000Z

477

Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation  

SciTech Connect

An interconnected electric power system is a complex system that must be operated within a safe frequency range in order to reliably maintain the instantaneous balance between generation and load. This is accomplished by ensuring that adequate resources are available to respond to expected and unexpected imbalances and restoring frequency to its scheduled value in order to ensure uninterrupted electric service to customers. Electrical systems must be flexible enough to reliably operate under a variety of"change" scenarios. System planners and operators must understand how other parts of the system change in response to the initial change, and need tools to manage such changes to ensure reliable operation within the scheduled frequency range. This report presents a systematic approach to identifying metrics that are useful for operating and planning a reliable system with increased amounts of variable renewable generation which builds on existing industry practices for frequency control after unexpected loss of a large amount of generation. The report introduces a set of metrics or tools for measuring the adequacy of frequency response within an interconnection. Based on the concept of the frequency nadir, these metrics take advantage of new information gathering and processing capabilities that system operators are developing for wide-area situational awareness. Primary frequency response is the leading metric that will be used by this report to assess the adequacy of primary frequency control reserves necessary to ensure reliable operation. It measures what is needed to arrest frequency decline (i.e., to establish frequency nadir) at a frequency higher than the highest set point for under-frequency load shedding within an interconnection. These metrics can be used to guide the reliable operation of an interconnection under changing circumstances.

Eto, Joseph H.; Undrill, John; Mackin, Peter; Daschmans, Ron; Williams, Ben; Haney, Brian; Hunt, Randall; Ellis, Jeff; Illian, Howard; Martinez, Carlos; O' Malley, Mark; Coughlin, Katie; LaCommare, Kristina Hamachi

2010-12-20T23:59:59.000Z

478

Network performance measurement with periodic streams  

Science Conference Proceedings (OSTI)

This memo describes a periodic sampling method and relevant metrics for assessing the performance of IP networks. First, the memo motivates periodic sampling and addresses the question of its value as an alternative to the Poisson sampling described ...

V. Raisanen; G. Grotefeld; A. Morton

2002-11-01T23:59:59.000Z

479

Metrics and Benchmarks for Energy Efficiency in Laboratories  

E-Print Network (OSTI)

benchmarks that are based on the actual measured energy use of comparable buildings.energy efficiency metrics and benchmarks for laboratories, which have been developed and applied to several laboratory buildings –building targets be evaluated against empirical benchmarks that are based on the measured energy

Mathew, Paul; Rumsey Engineers

2008-01-01T23:59:59.000Z

480

Enabling Large-Scale Deliberation Using Attention-Mediation Metrics  

Science Conference Proceedings (OSTI)

Humanity now finds itself faced with a range of highly complex and controversial challenges--such as climate change, the spread of disease, international security, scientific collaborations, product development, and so on--that call upon us to bring ... Keywords: Argumentation, Deliberation, Metrics

Mark Klein

2012-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "management performance metrics" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

A Fisher-Rao Metric for Paracatadioptric Images of Lines  

Science Conference Proceedings (OSTI)

In a central paracatadioptric imaging system a perspective camera takes an image of a scene reflected in a paraboloidal mirror. A 360° field of view is obtained, but the image is severely distorted. In particular, straight lines in the scene project ... Keywords: Central projection, Fisher-Rao metric, Hough transform, Line detection, Paraboloidal mirror, Paracatadioptric system, Sobel operator, Trace transform

Stephen J. Maybank; Siohoi Ieng; Ryad Benosman

2012-09-01T23:59:59.000Z

482

Density-metric unimodular gravity: Vacuum maximal symmetry  

SciTech Connect

We have investigated the vacuum maximally symmetric solutions of recently proposed density-metric unimodular gravity theory. The results are widely different from inflationary scenario. The exponential dependence on time in deSitter space is substituted by a power law. Open space-times with non-zero cosmological constant are excluded.

Abbassi, A.H., E-mail: ahabbasi@modares.ac.ir [Department of Physics, School of Sciences, Tarbiat Modares University, P.O. Box 14155-4838, Tehran (Iran, Islamic Republic of); Abbassi, A.M., E-mail: amabasi@khayam.ut.ac.ir [Department of Physics, University of Tehran, P.O. Box 14155-6455, Tehran (Iran, Islamic Republic of)

2011-05-15T23:59:59.000Z

483