National Library of Energy BETA

Sample records for management improvement performance

  1. ORISE: Performance Improvement Management System (PIMS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Improvement Management System (PIMS) PIMS web-based application aids Veterans Health Administration (VHA) Emergency Management in response to local emergencies and...

  2. FY 2012 Overall Contract and Project Management Improvement Performance

    Energy Savers [EERE]

    1 Service Contract Inventory Analysis Plan Department of Energy Office of Procurement & Assistance Management Strategic Programs Division (MA-622) December 2011 Department of Energy FY 2011 Service Contract Inventory Plan for Analysis The Department of Energy (DOE) approach will be performed in accordance with the criteria set out in Consolidated Appropriations Act, 2010, (Pub. L. No. 111-117, § 743 (2009)) and Appendix D of the November 5, 2010 OMB Memorandum on Service Contract

  3. FY 2016 Overall Contract and Project Management Improvement Performance

    Energy Savers [EERE]

    PERFORMANCE APPRAISAL CYCLE - CLOSEOUT GUIDANCE | Department of Energy 5 SENIOR EXECUTIVE SERVICE (SES) AND SENIOR PROFESSIONAL (SP) PERFORMANCE APPRAISAL CYCLE - CLOSEOUT GUIDANCE FY 2015 SENIOR EXECUTIVE SERVICE (SES) AND SENIOR PROFESSIONAL (SP) PERFORMANCE APPRAISAL CYCLE - CLOSEOUT GUIDANCE The FY 2015 performance appraisal cycle for both SES and SP members, which includes Senior Level (SL) and Scientific or Professional (ST) employees, concluded on September 30, 2015. In order to

  4. FY 2011 Overall Contract and Project Management Improvement Performance

    Energy Savers [EERE]

    0 Service Contract Inventory Analysis Department of Energy Office of Procurement & Assistance Management Strategic Programs Division (MA-622) January 2012 (REVISED) FY2010 Service Contract Inventory Analysis Department of Energy Contents Page Section 1: Background 1 Section 2: Analysis and Findings 3 Section 3: Next Steps 5 FY2010 Service Contract Inventory Analysis Department of Energy 1 Section 1: Background Section 743 of Division C of the FY 2010 Consolidated Appropriations Act, P.L.

  5. FY 2015 Overall Contract and Project Management Improvement Performance

    Energy Savers [EERE]

    Department of Energy Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY_2014_Data_Related_to_Operations_and_Maintenance_Memorandum.pdf (494.62 KB) More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations FY 2012 Real Property Deferred, Actual, and

  6. FY 2009 Overall Contract and Project Management Improvement Performance

    Energy Savers [EERE]

    Budget Investing in Science and Energy Security February 5, 2007 1 The Focus * Investing in World-Class Science * Advancing Energy Security * Reducing Dependence on Foreign Sources of Energy * Promoting the Use of Clean Energy * Honoring our Commitments Supporting our Nation's Highest Priorities 2 DOE Budget : FY 2007 and FY 2008 ($ in Billions) National Security $9.3 Corporate Management $1.0 Science $4.1 Energy and Environment $9.2 FY 2007 Request $23.6 Billion FY 2008 Request $24.3 Billion FY

  7. High Performance Energy Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Energy Management Reduce energy use and meet your business objectives By applying continuous improvement practices similar to Lean and Six Sigma, the BPA Energy Smart...

  8. Improving Contractor Past Performance

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Federal Procurement Policy, (OFPP) performed an assessment of how well some agencies, including the Department of Energy, are managing these efforts. The attached OFPP memorandum of January 21, 2011, entitled "Improving the Use of Contractor Performance Information Assessments: Summary of the Office of Federal Procurement Policy's review, and Strategies for Improvement" provides the details of this assessment which includes the Department of Energy. Also, the memo provides some very good guidance on preparing contractor performance evaluation reports. The Acquisition Guide Chapter 42.15 Contractor Performance Information incorporates the guidance that is not otherwise part of the Chapter. Revisions are made to Section II – Parts C and I.

  9. Using performance parameters, metrified performance objectives, and quality management assessments to improve the effectiveness of research organizations

    SciTech Connect (OSTI)

    Bodnarczuk, M

    1995-04-01

    This paper begins by raising the issue of whether the theoretical model of customer-suppliers-products-services usefully describes the activities of laboratory life, using a case study from Fermilab. After describing scientific activities as work, not volunteerism, I present a model that has four performance parameters that can be used to evaluate DOE-funded research laboratories: (1) Do they have a well-defined management system? (2) Are they doing good science? (3) Are they managing their resources effectively? (4) Are they responsive to their customers? From these four parameters I describe how to metrify performance objectives, then use them to evaluate research organizations. I describe these performance objectives within the context of views I have published elsewhere, and according to Stephen R. Covey`s metaphor of production/production capability (P/PC) balance in his book The 7 Habits of Highly Effective People.

  10. Keys to improving environmental performance

    SciTech Connect (OSTI)

    Moreau, R.L.; Raught, D.L.

    1996-11-01

    Environmental protection is a mainstream issue in today`s society. Both internal and external drivers motivate the oil and ms industry to continuously improve environmental performance. Companies are integrating environmental considerations into their business plans to a greater extent, and are directing proportionally more resources toward managing these issues. This paper addresses several environmental management focus areas in Exxon`s domestic E&P sector to: (1) manage risks, (2) ensure compliance, (3) improve performance, and (4) assist in the development of balanced legislation and regulations. Specific examples of Production Department programs are discussed, along with keys to success for continued progress in improving performance.

  11. Acquisition and Project Management Continuous Improvement Presentation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy and Project Management Continuous Improvement Presentation Acquisition and Project Management Continuous Improvement Presentation Presentation on Acquisition and Project Management Continuous Improvement. Acquisition and Project Management Continuous Improvement presentation (1.43 MB) More Documents & Publications Occupational Safety Performance Voluntary Protection Program Onsite Review, Safeguards and Security - August 2012 Report on Acquisition and Project

  12. Managing Critical Management Improvement Initiatives

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-10-01

    Provides requirements and responsibilities for planning, executing and assessing critical management improvement initiatives within DOE. DOE N 251.59, dated 9/27/2004, extends this Notice until 10/01/2005. Archived 11-8-10. Does not cancel other directives.

  13. FY 2016 Overall Contract and Project Management Improvement Performanc...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2016 Overall Contract and Project Management Improvement Performance Metrics and Targets ...

  14. FY 2013 Overall Contract and Project Management Improvement Performanc...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2013 Overall Contract and Project Management Improvement Performance Metrics and Targets ...

  15. FY 2010 Overall Contract and Project Management Improvement Performanc...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2010 Overall Contract and Project Management Improvement Performance Metrics and Targets ...

  16. FY 2009 Overall Contract and Project Management Improvement Performanc...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2009 Overall Contract and Project Management Improvement Performance Metrics and Targets ...

  17. FY 2015 Overall Contract and Project Management Improvement Performanc...

    Energy Savers [EERE]

    5 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2015 Overall Contract and Project Management Improvement Performance Metrics and Targets ...

  18. FY 2008 Overall Contract and Project Management Improvement Performanc...

    Office of Environmental Management (EM)

    8 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2008 Overall Contract and Project Management Improvement Performance Metrics and Targets FY ...

  19. FY 2014 Overall Contract and Project Management Improvement Performanc...

    Office of Environmental Management (EM)

    4 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2014 Overall Contract and Project Management Improvement Performance Metrics and Targets ...

  20. FY 2012 Overall Contract and Project Management Improvement Performanc...

    Energy Savers [EERE]

    2 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2012 Overall Contract and Project Management Improvement Performance Metrics and Targets ...

  1. MCNP Progress & Performance Improvements

    SciTech Connect (OSTI)

    Brown, Forrest B.; Bull, Jeffrey S.; Rising, Michael Evan

    2015-04-14

    Twenty-eight slides give information about the work of the US DOE/NNSA Nuclear Criticality Safety Program on MCNP6 under the following headings: MCNP6.1.1 Release, with ENDF/B-VII.1; Verification/Validation; User Support & Training; Performance Improvements; and Work in Progress. Whisper methodology will be incorporated into the code, and run speed should be increased.

  2. FY 2011 Overall Contract and Project Management Improvement Performanc...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications FY 2013 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2014 Overall Contract and Project Management Improvement ...

  3. Project Management Improvements Drive Progress

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Improving project management has been a top priority of EM’s senior leadership.

  4. Acquisition and Project Management Continuous Improvement Presentation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Project Management Continuous Improvement Presentation Acquisition and Project Management Continuous Improvement Presentation Presentation on Acquisition and Project Management ...

  5. Improving Outage Performance: Outage Optimization Process

    SciTech Connect (OSTI)

    LaPlatney, Jere J.

    2006-07-01

    Planned outage performance is a key measure of how well an Nuclear Power Plant (NPP) is operated. Performance during planned outages strongly affects virtually all of a plant's performance metrics. In recognition of this fact, NPP operators worldwide have and continue to focus on improving their outage performance. The process of improving outage performance is commonly referred to as 'Outage Optimization' in the industry. This paper starts with a summary of the principles of Outage Optimization. It then provides an overview of a process in common use in the USA and elsewhere to manage the improvement of planned outages. The program described is comprehensive in that it involves managing improvement in both the Preparation and Execution phases of outage management. (author)

  6. Performance Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The FY 2015 performance appraisal cycle for both SES and SP members, which ... June 5, 2015 SES Performance Management System Policy and Operating Procedures The SES ...

  7. Report on Acquisition and Project Management Continuous Improvement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy on Acquisition and Project Management Continuous Improvement Report on Acquisition and Project Management Continuous Improvement EM senior management has committed to extensive management reforms and has completed several robust improvements in contract and project management. Additional improvement initiatives are continuing and this document outlines the consolidated plan of these initiatives in a top-down framework of EM vision, goals, strategies, performance metrics,

  8. NASA Marshall Space Flight Center Improves Cooling System Performance: Best Management Practice Case Study #10: Cooling Towers (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-02-01

    National Aeronautics and Space Administration's (NASA) Marshall Space Flight Center (MSFC) has a longstanding sustainability program that revolves around energy and water efficiency as well as environmental protection. MSFC identified a problematic cooling loop with six separate compressor heat exchangers and a history of poor efficiency. The facility engineering team at MSFC partnered with Flozone Services, Incorporated to implement a comprehensive water treatment platform to improve the overall efficiency of the system.

  9. Improving Data Mobility & Management for International Cosmology...

    Office of Scientific and Technical Information (OSTI)

    Improving Data Mobility & Management for International Cosmology Citation Details In-Document Search Title: Improving Data Mobility & Management for International Cosmology In February ...

  10. Furnace Blower Performance Improvements - Building America Top...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Furnace Blower Performance Improvements - Building America Top Innovation Furnace Blower Performance Improvements - Building America Top Innovation This photo shows a ...

  11. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Lab Plan - Other plans (SiteFacilities, WFD, etc) * Execute--perform technical & business functions - Management systems (CAS) * Check--measureanalyze & evaluate...

  12. Contract and Project Management Improvement (CPMI) Closure Report -- April

    Energy Savers [EERE]

    2012 | Department of Energy Contract and Project Management Improvement (CPMI) Closure Report -- April 2012 Contract and Project Management Improvement (CPMI) Closure Report -- April 2012 The Department of Energy (DOE) is committed to making continuous improvements in contract and project management performance. One of the first steps the Department took to improve contract and project management was to hold a Root Cause Analysis (RCA) Workshop in 2007. Following the RCA Workshop, DOE

  13. Employee Performance Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-03-14

    To establish requirements and responsibilities for employee performance appraisals, performance-related awards, and other forms of employee recognition. Cancels DOE O 331.1A and (2) existing provisions of DOE O 3450.1B. Cancelled by DOE O 331.1C.

  14. Employee Performance Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-03-14

    To establish requirements and responsibilities for employee performance appraisals, performance-related awards, and other forms of employee recognition. (Cancels existing provisions of DOE O 3450.1B, Incentive Awards, dated 6/23/92.) Cancels DOE O 331.1A, DOE O 3450.1B. Canceled by DOE O 331.1C

  15. Employee Performance Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-06-15

    To establish requirements and responsibilities for employee performance appraisals, performance-related awards, and other forms of employee recognition. This Order covers most employees at grades GS-15 and below. Cancels DOE O 331.1. Canceled by DOE O 331.1B.

  16. Project Hanford management contract quality improvement project management plan

    SciTech Connect (OSTI)

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  17. Modifications improve waterflood performance model

    SciTech Connect (OSTI)

    El-Banbi, A.H.; Abdel Wally, A.; Abd-el Fattah, K.A.; Sayyouh, M.H.

    1996-01-01

    Modifications to the Craig-Geffen-Morse (CGM) waterflooding model improve reservoir performance predictions and allow for the inclusion of pressure drop variations with time. The modified model was validated against numerical simulation results. The paper describes the CGM model, the hypothetical data set, the simulation technique, comparisons between the CGM model and the simulation, and modifications to the CGM model relating to pressure drop variation and water production.

  18. Nanolubricants to Improve Chiller Performance | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nanolubricants to Improve Chiller Performance Nanolubricants to Improve Chiller Performance Emerging Technologies Project for the 2013 Building Technologies Office's Program Peer ...

  19. Smart Grid Projects Are Improving Performance and Helping Consumers Better

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manage their Energy Use | Department of Energy Projects Are Improving Performance and Helping Consumers Better Manage their Energy Use Smart Grid Projects Are Improving Performance and Helping Consumers Better Manage their Energy Use November 14, 2014 - 5:07pm Addthis Hank Kenchington Hank Kenchington Deputy Assistant Secretary, Cybersecurity and Emerging Threats Research and Development After nearly five years, the 131 smart grid projects funded through the 2009 Recovery Act are nearing

  20. Managing spares for improved availability

    SciTech Connect (OSTI)

    Moncrief, E.C.; Schroder, R.M.

    1987-01-01

    A recent survey by the U.S. Nuclear Regulatory Commission of maintenance practices at U.S. nuclear power plants confirms that spare parts availability is, to some extent, a problem at all but a few plants. Fortunately, significant improvement is possible without ballooning inventory. The vast majority of total dollar value of spare parts inventory at power generation stations, whether nuclear or fossil, is rarely used (parts or components that are used 12 or less times per year including many with a history of no use for many years). Because rarely used inventory is not effectively managed with traditional inventory management techniques, opportunities exist both to increase availability and to reduce investment. But this requires a unique statistical tool that can recommend an unbiased, economic reorder point to be used in the materials management system. Inventory Solutions Inc. (ISI) of Akron, Ohio, has developed such a tool, rarely used inventory stocking logic (RUSL), which is a user friendly decision support tool for setting spare parts reorder points. RUSL, based on statistical computations enhanced to include the most advanced techniques developed for use in aerospace and military combat-readiness, calculates the optimum stocking level to achieve the desired spare part availability at the station.

  1. EM Hosts Contract Performance and Management Workshop

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM hosted the Environmental Management Contract Performance and Management Workshop at DOE headquarters Wednesday.

  2. Supervisory - Non-Supervisory Employee Performance Management...

    Energy Savers [EERE]

    Supervisory - Non-Supervisory Employee Performance Management and Recognition Program Desk Reference Supervisory - Non-Supervisory Employee Performance Management and Recognition ...

  3. Employee Performance Management and Recognition Program | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Employee Performance Management and Recognition Program Employee Performance Management and Recognition Program The purpose of this program is to establish requirements and ...

  4. Improving Fatigue Performance of AHSS Welds

    SciTech Connect (OSTI)

    Feng, Zhili; Yu, Xinghua; Erdman, III, Donald L.; Wang, Yanli; Kelly, Steve; Hou, Wenkao; Yan, Benda; Wang, Zhifeng; Yu, Zhenzhen; Liu, Stephen

    2015-03-01

    Reported herein is technical progress on a U.S. Department of Energy CRADA project with industry cost-share aimed at developing the technical basis and demonstrate the viability of innovative in-situ weld residual stresses mitigation technology that can substantially improve the weld fatigue performance and durability of auto-body structures. The developed technology would be costeffective and practical in high-volume vehicle production environment. Enhancing weld fatigue performance would address a critical technology gap that impedes the widespread use of advanced high-strength steels (AHSS) and other lightweight materials for auto body structure light-weighting. This means that the automotive industry can take full advantage of the AHSS in strength, durability and crashworthiness without the concern of the relatively weak weld fatigue performance. The project comprises both technological innovations in weld residual stress mitigation and due-diligence residual stress measurement and fatigue performance evaluation. Two approaches were investigated. The first one was the use of low temperature phase transformation (LTPT) weld filler wire, and the second focused on novel thermo-mechanical stress management technique. Both technical approaches have resulted in considerable improvement in fatigue lives of welded joints made of high-strength steels. Synchrotron diffraction measurement confirmed the reduction of high tensile weld residual stresses by the two weld residual stress mitigation techniques.

  5. Strategic Energy Management and Continuous Improvement Resouces |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Strategic Energy Management and Continuous Improvement Resouces Strategic Energy Management and Continuous Improvement Resouces A successful strategic energy management plan sets goals, tracks progress, and reports results while building long-term relationships with energy users and targeting persistent energy savings. Effective planning ensures continuous improvement of energy efficiency, increases the property value of buildings, and can reduce costs across many end

  6. Nanolubricants to Improve Chiller Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies Office eere.energy.gov Approach * Pool-boiling rig used to measure heat transfer performance of R134ananolubricant mixtures with nanoparticle of varied ...

  7. Improving Access to Foundational Energy Performance Data

    SciTech Connect (OSTI)

    Studer, D.; Livingood, W.; Torcellini, P.

    2014-08-01

    Access to foundational energy performance data is key to improving the efficiency of the built environment. However, stakeholders often lack access to what they perceive as credible energy performance data. Therefore, even if a stakeholder determines that a product would increase efficiency, they often have difficulty convincing their management to move forward. Even when credible data do exist, such data are not always sufficient to support detailed energy performance analyses, or the development of robust business cases. One reason for this is that the data parameters that are provided are generally based on the respective industry norms. Thus, for mature industries with extensive testing standards, the data made available are often quite detailed. But for emerging technologies, or for industries with less well-developed testing standards, available data are generally insufficient to support robust analysis. However, even for mature technologies, there is no guarantee that the data being supplied are the same data needed to accurately evaluate a product?s energy performance. To address these challenges, the U.S. Department of Energy funded development of a free, publically accessible Web-based portal, the Technology Performance Exchange(TM), to facilitate the transparent identification, storage, and sharing of foundational energy performance data. The Technology Performance Exchange identifies the intrinsic, technology-specific parameters necessary for a user to perform a credible energy analysis and includes a robust database to store these data. End users can leverage stored data to evaluate the site-specific performance of various technologies, support financial analyses with greater confidence, and make better informed procurement decisions.

  8. Improving Project Management | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Secretary of Energy Ernest Moniz has made improving project management a priority at the Energy Department. In August 2013, the Secretary established a special working group that...

  9. Environmental Management Performance Report 11/1999

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-02-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management performance by: US Department of Energy, Richland Operation

  10. Recommendations to Improve EVM and Project Management Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recommendations to Improve EVM and Project Management Integration in the DOE Recommendations to Improve EVM and Project Management Integration in the DOE Significant improvements ...

  11. Spares management for improved maintenance

    SciTech Connect (OSTI)

    Moncrief, E.C.; Schroder, R.M.

    1987-01-01

    A recent survey by the US Nuclear Regulatory Commission (NRC) of maintenance practices at US nuclear power plants confirms that spare parts availability is, to some extent, a problem at all but a few plants, and that 57% of the plants sometimes operated in a limiting condition for operation over the last year due to unavailability of spare parts. That's the bad news. The good news is that significant improvement is possible without ballooning inventory. The vast majority of total dollar value of spare parts inventory at power generation stations, whether nuclear or fossil, is rarely used (parts or components that are used 12 or less times per year including many with a history of no use for many years). Inventory Solutions of Akron, Ohio, has developed such a tool, called rarely used inventory stocking logic (RUSL) which is a user-friendly decision support tool for setting spare parts reorder points. Based on statistical computations enhanced to include the most advanced techniques developed for use in aerospace and military combat readiness, RUSL calculates the optimum stocking level to achieve the desired spare part availability at the station. In doing so, it considers the importance of the part in preventing an outage, as well as key economic ordering parameters, such as part cost, carrying cost, number of parts in service, historical observed usage, anticipated future usage, and lead time to replenish.

  12. Flipping crystals improves solar-cell performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Flipping crystals improves solar-cell performance Flipping crystals improves solar-cell performance Perovskite research team spin-casts crystals for efficient and resilient optoelectronic devices. July 6, 2016 Perovskite research team spin-casts crystals for efficient and resilient optoelectronic devices. Three types of large-area solar cells made out of two-dimensional perovskites. At left, a room-temperature cast film; upper middle is a sample with the problematic band gap, and at right is the

  13. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Process Maintain Lab Agenda Prepare ALP Program Execution Plan PEMP PreparationApproval POG Support CAS M-3 Implementation FNAL Enterprise Risk Management...

  14. Environmental Management Performance Report July 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-07-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcont.

  15. Improving Data Mobility & Management for International Cosmology

    SciTech Connect (OSTI)

    Borrill, Julian; Dart, Eli; Gore, Brooklin; Habib, Salman; Myers, Steven T.; Nugent, Peter; Petravick, Don; Thomas, Rollin

    2015-10-02

    In February 2015 the third workshop in the CrossConnects series, with a focus on Improving Data Mobility & Management for International Cosmology, was held at Lawrence Berkeley National Laboratory. Scientists from fields including astrophysics, cosmology, and astronomy collaborated with experts in computing and networking to outline strategic opportunities for enhancing scientific productivity and effectively managing the ever-increasing scale of scientific data.

  16. DOE SES PERFORMANCE MANAGEMENT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SES PERFORMANCE MANAGEMENT DOE SES PERFORMANCE MANAGEMENT This covers Department of Energy SES executives, as well as those Presidential appointees who have retained eligibility for SES performance appraisals and awards under 5 U.S.C. 3392(c). Documents Available for Download November 10, 2015 FY 2016 SENIOR EXECUTIVE SERVICE (SES) AND SENIOR PROFESSIONAL (SP) PERFORMANCE APPRAISAL OPENING GUIDANCE FY 2016 performance appraisal cycle for both SES and SP members, which includes Senior Level (SL)

  17. Environmental Management Performance Reports - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Impact Statements Environmental Management Performance Reports FY 2016 Reports FY 2015 Reports FY 2014 Reports FY 2013 Reports FY 2012 Reports FY 2011 Reports FY 2010 ...

  18. SES Performance Management System Policy and Operating Procedures

    Broader source: Energy.gov [DOE]

    The SES Performance Management System Policy and Operating Procedures are designed to provide the framework for DOE’s performance management system. This performance management system applies to...

  19. Contract and Project Management Improvement (CPMI) Closure Report...

    Energy Savers [EERE]

    Contract and Project Management Improvement (CPMI) Closure Report -- April 2012 Contract and Project Management Improvement (CPMI) Closure Report -- April 2012 The Department of ...

  20. Waste Heat Management Options for Improving Industrial Process...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Heat Management Options for Improving Industrial Process Heating Systems Waste Heat Management Options for Improving Industrial Process Heating Systems This presentation ...

  1. Improving Process Heating System Performance: A Sourcebook for Industry,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Third Edition | Department of Energy Third Edition Improving Process Heating System Performance: A Sourcebook for Industry, Third Edition This sourcebook introduces industry to process heating basics, performance opportunities for fuel and electric based systems, waste heat management and where they can find help on optimizing these important industrial systems. Over the years AMO has worked with the Industrial Heating Equipment Association (IHEA) in its development. IHEA's mission is to

  2. Method for improving fuel cell performance

    DOE Patents [OSTI]

    Uribe, Francisco A.; Zawodzinski, Thomas

    2003-10-21

    A method is provided for operating a fuel cell at high voltage for sustained periods of time. The cathode is switched to an output load effective to reduce the cell voltage at a pulse width effective to reverse performance degradation from OH adsorption onto cathode catalyst surfaces. The voltage is stepped to a value of less than about 0.6 V to obtain the improved and sustained performance.

  3. NASA Marshall Space Flight Center Improves Cooling System Performance...

    Office of Environmental Management (EM)

    Marshall Space Flight Center Improves Cooling System Performance NASA Marshall Space Flight Center Improves Cooling System Performance NASA Marshall Space Flight Center Improves ...

  4. Benchmarking: The foundation for performance improvement

    SciTech Connect (OSTI)

    Fogarty, J.; Miller, R.; Dong, C.

    1996-07-01

    This paper focuses on the key role that Benchmarking plays in supporting and accelerating all forms of performance improvement. It outlines the continuing need for benchmarking as the industry becomes more competitive, as well as stressing the need for sharing practices both in and outside of the industry. The successful benchmarking program for performance improvement must start by identifying areas that present the most opportunity for improvement. In preparing for external benchmarking one must concentrate on picking partners that complement one`s weaknesses, while also addressing confidentiality, data accuracy, validation, and normalization issues. Essential to success is that the project yield actionable results and help set concrete improvement targets. A description of how to use benchmarking findings to identify areas with maximum opportunity and solutions (i.e., identify areas with target gaps and practices to close the gaps) is given. Additionally, an example improvement plan and summary of results from its implementation at Los Angeles Department of Water and Power (LADWP) are provided.

  5. Improving Project Management at the Department of Energy | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Improving Project Management at the Department of Energy Improving Project Management at the Department of Energy December 19, 2014 - 12:15pm Addthis Improving Project Management at the Department of Energy John J. MacWilliams John J. MacWilliams Associate Deputy Secretary Read the Report Learn more by reading the full Improving Project Management report. Secretary Ernest Moniz has made improving project management a priority at the Energy Department. In August 2013, the Secretary

  6. Guidance on Basic Best Practices in Management of Energy Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Basic Best Practices in Management of Energy Performance Buildings Guidance on Basic Best Practices in Management of Energy Performance Buildings Building energy management best ...

  7. Improving Motor and Drive System Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SOURCEBOOK FOR INDUSTRY ADVANCED MANUFACTURING OFFICE Improving Motor and Drive System Performance DISCLAIMER This publication was prepared by the Washington State University Energy Program and the National Renewable Energy Laboratory for the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy. Neither the United States, DOE, the Copper Development Association, the Washington State University Energy Program, National Electrical Manufacturers Association, nor any of their

  8. SL/ST Performance Management Training

    Broader source: Energy.gov [DOE]

    The training provides an overview of DOE's SL/ST appraisal system, as well as describes key actions within all of the major phases of the annual performance management cycle. The guidance/training...

  9. SES Performance Management System Plan Training | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon FY2016 SES Performance Management Training.pdf Responsible Contacts Keidra Biddiex Human Resources Specialist E-mail Keidra.Biddiex@hq.doe.gov Phone (202) 586-7693 Deanna ...

  10. Laboratory performance evaluation reports for management

    SciTech Connect (OSTI)

    Lindahl, P.C.; Hensley, J.E.; Bass, D.A.; Johnson, P.L.; Marr, J.J.; Streets, W.E.; Warren, S.W.; Newberry, R.W.

    1995-05-01

    In support of the US DOE`s environmental restoration efforts, the Integrated Performance Evaluation Program (IPEP) was developed to produce laboratory performance evaluation reports for management. These reports will provide information necessary to allow DOE headquarters and field offices to determine whether or not contracted analytical laboratories have the capability to produce environmental data of the quality necessary for the remediation program. This document describes the management report.

  11. Secretary's 2014 Award for Project Management Improvement | Department of

    Office of Environmental Management (EM)

    Energy for Project Management Improvement Secretary's 2014 Award for Project Management Improvement Nuclear Materials Safeguards & Security Upgrades (NMSSUP) Project (The National Nuclear Security Administration) (855.47 KB) More Documents & Publications 2014 Awards for Project Management Secretary's 2014 Achievement Awards Acquisition and Project Management Awards Presentations - Ingrid Kolb, Director, Office of Management

  12. Technetium Getters to Improve Cast Stone Performance

    SciTech Connect (OSTI)

    Neeway, James J.; Lawter, Amanda R.; Serne, R. Jeffrey; Asmussen, Robert M.; Qafoku, Nikolla

    2015-10-15

    The cementitious material known as Cast Stone has been selected as the preferred waste form for solidification of aqueous secondary liquid effluents from the Hanford Tank Waste Treatment and Immobilization Plant (WTP) process condensates and low-activity waste (LAW) melter off-gas caustic scrubber effluents. Cast Stone is also being evaluated as a supplemental immobilization technology to provide the necessary LAW treatment capacity to complete the Hanford tank waste cleanup mission in a timely and cost effective manner. Two radionuclides of particular concern in these waste streams are technetium-99 (99Tc) and iodine-129 (129I). These radioactive tank waste components contribute the most to the environmental impacts associated with the cleanup of the Hanford site. A recent environmental assessment of Cast Stone performance, which assumes a diffusion controlled release of contaminants from the waste form, calculates groundwater in excess of the allowable maximum permissible concentrations for both contaminants. There is, therefore, a need and an opportunity to improve the retention of both 99Tc and 129I in Cast Stone. One method to improve the performance of Cast Stone is through the addition of “getters” that selectively sequester Tc and I, therefore reducing their diffusion out of Cast Stone. In this paper, we present results of Tc and I removal from solution with various getters with batch sorption experiments conducted in deionized water (DIW) and a highly caustic 7.8 M Na Ave LAW simulant. In general, the data show that the selected getters are effective in DIW but their performance is comprised when experiments are performed with the 7.8 M Na Ave LAW simulant. Reasons for the mitigated performance in the LAW simulant may be due to competition with Cr present in the 7.8 M Na Ave LAW simulant and to a pH effect.

  13. Advanced fenestration systems for improved daylight performance

    SciTech Connect (OSTI)

    Lee, E S; Selkowitz, S

    1998-03-01

    The use of daylight to replace or supplement electric lighting in commercial buildings can result in significant energy and demand savings. High performance fenestration systems area necessary, but not sufficient, element of any successful daylighting design that reduces lighting energy use. However, these savings may be reduced if the fenestration systems impose adverse thermal loads. In this paper, we review the state of the art of several advanced fenestration systems which are designed to maximize the energy-saving potential of daylighting, while improving comfort and visual performance at an "affordable" cost. We first review the key performance issues that successful fenestration systems must address, and then review several classes of fenestration systems intended to meet those performance needs. The systems are reviewed in two categories: static and dynamic. Static systems include not only glazings, such as spectrally-selective and holographic glazings, but specialized designs of light-shelves and light-pipes, while dynamic systems cover automatically-operated Venetian blinds and electrochromic glazings. We include a discussion of the research directions in this area, and how these efforts might lead to static and dynamic hardware and system solutions that fulfill the multiple roles that these systems must play in terms of energy efficiency, comfort, visual performance, health, and amenity in future buildings.

  14. Case Study - The Challenge: Improving Sewage Pump System Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Case Study - The Challenge: Improving Sewage Pump System Performance Case Study - The Challenge: Improving Sewage Pump System Performance This case study looks at how Trumbull, ...

  15. Improving Compressed Air System Performance: A Sourcebook for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industry, Third Edition Improving Compressed Air System Performance: A Sourcebook for Industry, Third Edition AMO's "Improving Compressed Air System Performance: A Sourcebook for ...

  16. Improving Compressed Air System Performance Third Edition | Department...

    Energy Savers [EERE]

    Compressed Air System Performance Third Edition Improving Compressed Air System Performance Third Edition PDF icon Improving Compressed Air Sourcebook version 3.pdf More Documents ...

  17. New MEA Materials for Improved DMFC Performance, Durability and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MEA Materials for Improved DMFC Performance, Durability and Cost New MEA Materials for Improved DMFC Performance, Durability and Cost Presented at the Department of Energy Fuel ...

  18. Environmental Management Performance Report November 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-11-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

  19. Environmental Management Performance Report April 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-04-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S and T) Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries.

  20. Environmental Management Performance Report for December 1999

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-02-16

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S&T) Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A listing of what is contained in the sections can be found in the Table of Contents.

  1. INTEGRATED SAFETY MANAGEMENT SYSTEM SAFETY CULTURE IMPROVEMENT INITIATIVE

    SciTech Connect (OSTI)

    MCDONALD JA JR

    2009-01-16

    In 2007, the Department of Energy (DOE) identified safety culture as one of their top Integrated Safety Management System (ISMS) related priorities. A team was formed to address this issue. The team identified a consensus set of safety culture principles, along with implementation practices that could be used by DOE, NNSA, and their contractors. Documented improvement tools were identified and communicated to contractors participating in a year long pilot project. After a year, lessons learned will be collected and a path forward determined. The goal of this effort was to achieve improved safety and mission performance through ISMS continuous improvement. The focus of ISMS improvement was safety culture improvement building on operating experience from similar industries such as the domestic and international commercial nuclear and chemical industry.

  2. Environmental Management Performance Report May 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-05-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-FU) a report of the Project Hanford Management Contractors' (PHMC)' Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, Metrics, and Cost/Schedule data contained herein is as of March 31, 2000. All other information is updated as noted.

  3. Environmental Management Performance Report March 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-03-16

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a report of the Project Hanford Management Contractors' (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear fuels , etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/schedule data contained herein is as of January 31, 2000. All other information is as of March 1, 2000.

  4. EM Hosts Second Contract Performance and Management Workshop in 2012

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM hosted its second Environmental Management Contract Performance and Management Workshop at DOE headquarters today.

  5. Environmental Management Performance Report June 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-06-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.

  6. Using logic models in managing performance of research and technology...

    Office of Scientific and Technical Information (OSTI)

    Using logic models in managing performance of research and technology programs: An example ... Title: Using logic models in managing performance of research and technology programs: An ...

  7. Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-15

    The Order establishes requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees other than those who are exempt herein or by memorandum. Admin Chg 1, dated 2-16-11, cancels DOE O 331.1C.

  8. Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-15

    The order establishes requirements and responsibilities for the performance management program for all supervisory and non supervisory employees at grades GS 15 and below or equivalent, employees in EJ and EK pay bands IV and V in the Excepted Service, and all wage grade employees. Cancels DOE O 331.1B. Admin Chg 1, 2-16-11.

  9. Financial Program Management for Continuous Improvement

    Office of Energy Efficiency and Renewable Energy (EERE)

    This webinar, held on March 16, 2011, focuses on ways to improve financial programs and discusses strategies for continuous improvements.

  10. SEP Energy Performance Improvement Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Performance Improvement Report SEP Energy Performance Improvement Report sep_logo_borderless.jpg DOE maintains documentation of Superior Energy Performance® (SEP(tm)) certifications as the SEP Administrator. SEP Verification Bodies that certify facilities submit the SEP Energy Performance Improvement Report to the SEP Administrator. The SEP Verification Body provides basic information about the energy performance improvement, how it was achieved, how models were applied from the SEP

  11. Improving Process Heating System Performance: A Sourcebook for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    It is not intended to be a comprehensive technical text on improving process heating ... Improving Process Heating System Performance: A Sourcebook for Industry, Third Edition ...

  12. Building America Case study: Advanced Controls Improve Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advanced controls improve the energy performance of combi systems. Combi energy effciency ... The controls improve effciency by allowing the system to operate at lower average return ...

  13. Opportunities for Improving Photovoltaic Performance with Better Transparent Contacts

    SciTech Connect (OSTI)

    Ginley, David S.; Perkins, John D.

    2015-06-14

    NREL and DOE recently held a workshop to assess the challenges, opportunities and potential impacts for improved transparent contacts (TCs) to positively impact current and emerging photovoltaic conversion technologies. Here, we report on the workshop outcomes based on the collective input and participation from industry, academia, national laboratories and DOE. A primary conclusion is that new emerging materials can have significant impacts on the overall performance, reliability and cost for commercial scale PV. One key observation is that TC's should no longer be thought of as a single-layer single-purpose material but as an integrated contact layer stack that includes a charge selective interface layer, a conducting layer and sometimes layers for reliability or light management. In addition, the long standing goal of developing of high performance atmospheric-pressure-processed TCs has finally been met by the rapidly improving Ag nanowire based composites with better than ITO performance from an all ink based process. Even the more conventional metal oxide materials are improving rapidly by introducing solution processed buffer layers, and even conductor layers. This rapid evolution has opened the way to high-throughput low-cost TC processing. Key desired metrics for TCs and approaches to achieving them are discussed.

  14. Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-15

    To establish requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees at grades GS-15 and below or equivalent, employees in EJ and EK pay bands IV and V in the Excepted Service, and all wage grade employees. Admin Chg 1, dated 2-16-11. Admin Chg 2, dated 2-26-2013. Admin Chg 3, dated 11-13-14 supersedes Admin Chg 2.

  15. Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-15

    To establish requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees at grades GS-15 and below or equivalent, employees in EJ and EK pay bands IV and V in the Excepted Service, and all wage grade employees. Admin Chg 1, dated 2-16-11. Admin Chg 2, dated 2-26-2013, cancels DOE O 331.1C Admin Chg 1. Canceled by DOE O 331.1C Chg 3.

  16. Improving Motor and Drive System Performance - A Sourcebook for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Motor and Drive System Performance - A Sourcebook for Industry Improving Motor and Drive System Performance - A Sourcebook for Industry This sourcebook outlines opportunities to ...

  17. Improving the Field Performance of Natural Gas Furnaces, Chicago...

    Energy Savers [EERE]

    the Field Performance of Natural Gas Furnaces Chicago, Illinois PROJECT INFORMATION Project Name: Improving Gas Furnace Performance-A Field and Lab Study at End of Life Location: ...

  18. J.R. Simplot: Burner Upgrade Project Improves Performance and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    J.R. Simplot: Burner Upgrade Project Improves Performance and Saves Energy at a Large Food Processing Plant J.R. Simplot: Burner Upgrade Project Improves Performance and Saves ...

  19. Sootblowing optimization for improved boiler performance

    DOE Patents [OSTI]

    James, John Robert; McDermott, John; Piche, Stephen; Pickard, Fred; Parikh, Neel J

    2013-07-30

    A sootblowing control system that uses predictive models to bridge the gap between sootblower operation and boiler performance goals. The system uses predictive modeling and heuristics (rules) associated with different zones in a boiler to determine an optimal sequence of sootblower operations and achieve boiler performance targets. The system performs the sootblower optimization while observing any operational constraints placed on the sootblowers.

  20. Sootblowing optimization for improved boiler performance

    DOE Patents [OSTI]

    James, John Robert; McDermott, John; Piche, Stephen; Pickard, Fred; Parikh, Neel J.

    2012-12-25

    A sootblowing control system that uses predictive models to bridge the gap between sootblower operation and boiler performance goals. The system uses predictive modeling and heuristics (rules) associated with different zones in a boiler to determine an optimal sequence of sootblower operations and achieve boiler performance targets. The system performs the sootblower optimization while observing any operational constraints placed on the sootblowers.

  1. IMPROVING COMPRESSED AIR SYSTEM PERFORMANCE: A SOURCEBOOK FOR INDUSTRY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IMPROVING COMPRESSED AIR SYSTEM PERFORMANCE: A SOURCEBOOK FOR INDUSTRY Improving Compressed Air System Performance A Sourcebook for Industry Third Edition U.S. DEPARTMENT OF ENERGY Energy Efficiency & Renewable Energy ADVANCED MANUFACTURING OFFICE IMPROVING COMPRESSED AIR SYSTEM PERFORMANCE: A SOURCEBOOK FOR INDUSTRY ACKNOWLEDGEMENTS Improving Compressed Air System Performance: A Sourcebook for Industry is a cooperative effort of the U.S. Department of Energy's Office of Energy Efficiency

  2. Improving Fan System Performance: A Sourcebook for Industry | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Fan System Performance: A Sourcebook for Industry Improving Fan System Performance: A Sourcebook for Industry This sourcebook is designed to provide fan system users with a reference outlining opportunities to improve system performance. It is not intended to be a comprehensive technical text on improving fan systems, but rather a document that makes users aware of potential performance improvements, provides some practical guidelines, and details where the user can find more help.

  3. NASA Marshall Space Flight Center Improves Cooling System Performance |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy NASA Marshall Space Flight Center Improves Cooling System Performance NASA Marshall Space Flight Center Improves Cooling System Performance NASA Marshall Space Flight Center Improves Cooling System Performance Case study details Marshall Space Flight Center's innovative technologies to improve water efficiency and cooling performance for one of its problematic cooling systems. The program saved the facility more than 800,000 gallons of water in eight months. Download the

  4. Waste Heat Management Options for Improving Industrial Process Heating

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems | Department of Energy Waste Heat Management Options for Improving Industrial Process Heating Systems Waste Heat Management Options for Improving Industrial Process Heating Systems This presentation covers typical sources of waste heat from process heating equipment, characteristics of waste heat streams, and options for recovery including Combined Heat and Power. Waste Heat Management Options for Improving Industrial Process Heating Systems (August 20, 2009) (494.7 KB) More

  5. Environmental Management Performance Report October 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-10-01

    This section provides an executive level summary of the performance information covered in this report and is intended to bring to Management's attention that information considered to be most noteworthy. All cost, schedule, milestone commitments, performance measures. and safety data is current as of August 31. Accomplishments, Issues and Integration items are current as of September 18 unless otherwise noted. The section begins with a description of notable accomplishments that have occurred since the last report and are considered to have made the greatest contribution toward safe, timely, and cost-effective clean up. Following the accomplishment section is an overall fiscal year-to-date summary analysis addressing cost, schedule, and milestone performance. Overviews of safety ensue. The next segment of the Executive Summary, entitled Critical Issues, is designed to identify the high-level challenges to achieving cleanup progress. The next section includes FY 2000 EM Management Commitment High Visibility Project Milestones and Critical Few Performance Measures. The Key Integration Activities section follows next, highlighting PHMC activities that cross contractor boundaries and demonstrate the shared value of partnering with other Site entities to accomplish the work. Concluding the Executive Summary, a forward-looking synopsis of Upcoming Planned Key Events is provided.

  6. Development of an equipment management model to improve effectiveness of processes

    SciTech Connect (OSTI)

    Chang, H. S.; Ju, T. Y.; Song, T. Y.

    2012-07-01

    The nuclear industries have developed and are trying to create a performance model to improve effectiveness of the processes implemented at nuclear plants in order to enhance performance. Most high performing nuclear stations seek to continually improve the quality of their operations by identifying and closing important performance gaps. Thus, many utilities have implemented performance models adjusted to their plant's configuration and have instituted policies for such models. KHNP is developing a standard performance model to integrate the engineering processes and to improve the inter-relation among processes. The model, called the Standard Equipment Management Model (SEMM), is under development first by focusing on engineering processes and performance improvement processes related to plant equipment used at the site. This model includes performance indicators for each process that can allow evaluating and comparing the process performance among 21 operating units. The model will later be expanded to incorporate cost and management processes. (authors)

  7. IT Capital Planning Corporate Management Improvement Program (CMIP)

    Broader source: Energy.gov [DOE]

    The Corporate Management Improvement Program (CMIP) was initiated by the Department in recognition of the fact that corporate legacy systems that support administrative functions were nearing the...

  8. Improving Process Heating System Performance: A Sourcebook for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This sourcebook introduces industry to process heating basics, performance opportunities for fuel and electric based systems, waste heat management and where they can find help on ...

  9. Radioactive Waste Management Complex performance assessment: Draft

    SciTech Connect (OSTI)

    Case, M.J.; Maheras, S.J.; McKenzie-Carter, M.A.; Sussman, M.E.; Voilleque, P.

    1990-06-01

    A radiological performance assessment of the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory was conducted to demonstrate compliance with appropriate radiological criteria of the US Department of Energy and the US Environmental Protection Agency for protection of the general public. The calculations involved modeling the transport of radionuclides from buried waste, to surface soil and subsurface media, and eventually to members of the general public via air, ground water, and food chain pathways. Projections of doses were made for both offsite receptors and individuals intruding onto the site after closure. In addition, uncertainty analyses were performed. Results of calculations made using nominal data indicate that the radiological doses will be below appropriate radiological criteria throughout operations and after closure of the facility. Recommendations were made for future performance assessment calculations.

  10. Program Analyst - DETAIL (Performance Improvement) | Department...

    Energy Savers [EERE]

    Improvement) for the Human Resources Service Delivery (HRSD) Program (HC-1.6). The detail may be extended. The detailee will play a key role in a Chief Human Capital Officer ...

  11. Improving Project Management | Department of Energy

    Office of Environmental Management (EM)

    Department of Energy Improving Communication with Industry during the Acquisition Process Improving Communication with Industry during the Acquisition Process The Office of Federal Procurement Policy, (OFPP) issued the attached memorandum entitled "Myth-Busting: Addressing Misconceptions to Improve Communication with Industry during the Acquisition Process" on February 2, 2011. PF2011-44 Improving Communication with Industry during the Acquisition Process (41.59 KB) PF2011-44a.pdf

  12. Training Framework to Improve the DOE Performance-Based Culture |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Training Framework to Improve the DOE Performance-Based Culture Training Framework to Improve the DOE Performance-Based Culture Guidance Memorandum for implementing the Secretaries initiative for improving the Performanced-Based Culture of the Department. Training Framework Improve Performance (239.56 KB) Responsible Contacts N. Tony Nguyen PROGRAM ANALYST E-mail tony.nguyen@hq.doe.gov Phone 202-586-4533 More Documents & Publications Audit Report: IG-0510 Annual

  13. Improving the Department's Management of Projects | Department...

    Office of Environmental Management (EM)

    DOE is managing some of the largest, most complex, and technically challenging projects in the public or private sector. Many are one-of-a-kind projects that involve the risks and ...

  14. FEMA Emergency Management Performance Grant Program

    Broader source: Energy.gov [DOE]

    The Emergency Management Performance Grant (EMPG) Program provides federal funds to assist state, local, tribal and territorial governments in preparing for all hazards, as authorized by Section 662 of the Post Katrina Emergency Management Reform Act (6 U.S.C. sect. 762) and the Robert T. Stafford Disaster Relief and Emergency Assistance Act, as amended (42 U.S.C. sect. 5121 et seq.). Title VI of the Stafford Act authorizes FEMA to make grants for the purpose of providing a system of emergency preparedness for the protection of life and property in the United States from hazards and to vest responsibility for emergency preparedness jointly in the federal government and the states and their political subdivisions. The FY 2015 EMPG will provide federal funds to assist state, local, tribal and territorial emergency management agencies to obtain the resources required to support the National Preparedness Goal's (NPG's) associated mission areas and core capabilities. The federal government, through the EMPG Program, provides necessary direction, coordination, and guidance, and provides necessary assistance, as authorized in this title, to support a comprehensive all hazards emergency preparedness system.

  15. Improving Steam System Performance: A Sourcebook for Industry, Second Edition

    SciTech Connect (OSTI)

    2012-02-23

    This sourcebook is designed to provide steam system users with a reference that describes the basic steam system components, outlines opportunities for energy and performance improvements, and discusses the benefits of a systems approach in identifying and implementing these improvement opportunities. The sourcebook is divided into three main sections: steam system basics, performance improvement opportunities, and where to find help.

  16. Performance metrics and life-cycle information management for building performance assurance

    SciTech Connect (OSTI)

    Hitchcock, R.J.; Piette, M.A.; Selkowitz, S.E.

    1998-06-01

    Commercial buildings account for over $85 billion per year in energy costs, which is far more energy than technically necessary. One of the primary reasons buildings do not perform as well as intended is that critical information is lost, through ineffective documentation and communication, leading to building systems that are often improperly installed and operated. A life-cycle perspective on the management of building information provides a framework for improving commercial building energy performance. This paper describes a project to develop strategies and techniques to provide decision-makers with information needed to assure the desired building performance across the complete life cycle of a building project. A key element in this effort is the development of explicit performance metrics that quantitatively represent performance objectives of interest to various building stakeholders. The paper begins with a discussion of key problems identified in current building industry practice, and ongoing work to address these problems. The paper then focuses on the concept of performance metrics and their use in improving building performance during design, commissioning, and on-going operations. The design of a Building Life-cycle Information System (BLISS) is presented. BLISS is intended to provide an information infrastructure capable of integrating a variety of building information technologies that support performance assurance. The use of performance metrics in case study building projects is explored to illustrate current best practice. The application of integrated information technology for improving current practice is discussed.

  17. Improving fuel-rod performance. [PWR; BWR

    SciTech Connect (OSTI)

    Ocken, H.; Knott, S.

    1981-03-01

    To reduce the risk of fuel-rod failures, utilities operate their nuclear reactors within conservative limits on power increases proposed by nuclear-fuel vendors. Of particular concern to US utilities is that adopting these limits results in an industrywide average plant capacity loss of 3% in BWR designs and 0.3% in PWR designs. To replace lost BWR capacity by other generating means currently costs the utilities $150 million annually, and losses for PWRs are about $20 million. Efforts are therefore being made to identify the factors responsible for Zircaloy degradation under PCI condition and to improve nuclear-fuel-rod design and reactor operation.

  18. IMPROVING CONSISTENCY OF PERFORMANCE ASSESSMENTS IN THE DOE COMPLEX

    SciTech Connect (OSTI)

    Seitz, R; Elmer Wilhite, E

    2009-01-20

    The low-level waste (LLW) performance assessment (PA) process has been traditionally focused on disposal facilities at a few United States Department of Energy (USDOE) sites and commercial disposal facilities. In recent years, there has been a dramatic increase in the scope of the use of PA-like modeling approaches, involving multiple activities, facilities, contractors and regulators. The scope now includes, for example: (1) National Environmental Policy Act (NEPA) assessments, (2) CERCLA disposal cells, (3) Waste Determinations and High-Level Waste (HLW) Closure activities, (4) Potential on-site disposal of Transuranic (TRU) waste, and (5) In-situ decommissioning (including potential use of existing facilities for disposal). The dramatic increase in the variety of activities requiring more detailed modeling has resulted in a similar increase in the potential for inconsistency in approaches both at a site and complexwide scale. This paper includes a summary of USDOE Environmental Management (EM) sponsored initiatives and activities for improved consistency. New initiatives entitled the Performance Assessment Community of Practice and Performance Assessment Assistance Team are also introduced.

  19. Improving Process Heating System Performance: A Sourcebook for Industry,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Second Edition | Department of Energy Second Edition Improving Process Heating System Performance: A Sourcebook for Industry, Second Edition This sourcebook describes basic process heating applications and equipment, and outlines opportunities for energy and performance improvements. It also discusses the merits of using a systems approach in identifying and implementing these improvement opportunities. It is not intended to be a comprehensive technical text on improving process heating

  20. Improving consumer value through enhanced performance around the world

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Improving consumer value through enhanced performance around the world Improving consumer value through enhanced performance around the world LANL statistical tools have helped create Reliability Technology (RT), which increases the overall fraction of productive manufacturing time, or "uptime," for its internal manufacturing lines. April 3, 2012 Improving consumer value through enhanced performance around the world Reliability Technology (RT) is a comprehensive reliability engineering

  1. Improving Steam System Performance: A Sourcebook for Industry, Second

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Edition | Department of Energy Steam System Performance: A Sourcebook for Industry, Second Edition Improving Steam System Performance: A Sourcebook for Industry, Second Edition This sourcebook is designed to provide steam system users with a reference that describes the basic steam system components, outlines opportunities for energy and performance improvements, and discusses the benefits of a systems approach in identifying and implementing these improvement opportunities. The sourcebook

  2. PROJECT PROFILE: An Integrated Tool for Improving Grid Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROJECT PROFILE: An Integrated Tool for Improving Grid Performance and Reliability of Combined Transmission-Distribution with High Solar Penetration (SuNLaMP) PROJECT PROFILE: An ...

  3. Improve Motor System Performance with MotorMaster+

    SciTech Connect (OSTI)

    2010-08-01

    Fact sheet describes how industrial plants can improve their motor system performance using DOE-AMO's MotorMaster+ software tool.

  4. Argonne continues to pave way to improved battery performance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    continues to pave way to improved battery performance testing By Angela Hardin * March 31, ... of information that can be extracted from lithium-ion battery cells during cycling. ...

  5. Intermetallic Electrodes Improve Safety and Performance in Lithium...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Intermetallic Electrodes Improve Safety and Performance in Lithium-Ion Batteries Technology available for licensing: A new class of intermetallic material that can be used as a ...

  6. Final Report - Novel Contact Materials for Improved Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Novel Contact Materials for Improved Performance CdTe Solar Cells Final Report - Novel ... Program: Foundational Program to Advance Cell Efficiency (F-PACE) Principal ...

  7. Improving Steam System Performance: A Sourcebook for Industry

    SciTech Connect (OSTI)

    2004-10-01

    A sourcebook designed to provide steam system users with a reference outlining opportunities to improve system performance and optimize energy efficiency in industrial energy systems.

  8. Improving Process Heating System Performance: A Sourcbook for Industry

    SciTech Connect (OSTI)

    2004-09-01

    A sourcebook designed to provide process heating system users with a reference outlining opportunities to improve system performance and optimize energy efficiency in industrial energy systems.

  9. Request for Information on Improving Performance of Federal Permitting...

    Energy Savers [EERE]

    Projects: Federal Register Notice Volume 78, No. 168 - August 29, 2013 Request for Information on Improving Performance of Federal Permitting and Review of Infrastructure...

  10. PROJECT PROFILE: Improving PV performance Estimates in the System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This project will improve the forecasting of lifetime PV system performance as well as operations and maintenance costs by incorporating the Photovoltaic Reliability and ...

  11. Improving Steam System Performance: A Sourcebook for Industry...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Improving Steam System Performance: A Sourcebook for Industry, Second Edition (October 2012) (1.85 MB) More Documents & Publications Flash High-Pressure Condensate to Regenerate ...

  12. Improved System Performance and Reduced Cost of a Fuel Reformer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Emissions Useful Life Requirement Improved System Performance and Reduced Cost of a Fuel Reformer, LNT, and SCR Aftertreatment System Meeting Emissions Useful Life Requirement An ...

  13. Building America Case study: Advanced Controls Improve Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advanced controls improve the energy performance of combi systems. Combi energy effciency is largely a factor of (1) the water temperature returning to the heating plant from the ...

  14. Improving Motor and Drive System Performance - A Sourcebook for Industry

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Motor and Drive System Performance - A Sourcebook for Industry Improving Motor and Drive System Performance - A Sourcebook for Industry This sourcebook outlines opportunities to improve motor and drive systems performance. The sourcebook is divided into four main sections: Motor and Drive System Basics: Summarizes important terms, relationships, and system design considerations relating to motor and drive systems. Performance Opportunity Road Map: Details the key

  15. Improving Pumping System Performance: A Sourcebook for Industry - Second

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Edition | Department of Energy Pumping System Performance: A Sourcebook for Industry - Second Edition Improving Pumping System Performance: A Sourcebook for Industry - Second Edition This sourcebook is designed to provide pump system users with a reference that outlines opportunities for improving system performance. It is not meant to be a comprehensive technical text on pumping systems; rather, it provides practical guidelines and information to make users aware of potential performance

  16. New MEA Materials for Improved DMFC Performance, Durability and Cost

    SciTech Connect (OSTI)

    Fletcher, James H.; Campbell, Joseph L.; Cox, Philip; Harrington, William J.

    2013-09-16

    Abstract Project Title: New MEA Materials for Improved DMFC Performance, Durability and Cost The University of North Florida (UNF)--with project partners the University of Florida, Northeastern University, and Johnson Matthey--has recently completed the Department of Energy (DOE) project entitled “New MEA Materials for Improved DMFC Performance, Durability and Cost”. The primary objective of the project was to advance portable fuel cell MEA technology towards the commercial targets as laid out in the DOE R&D roadmap by developing a passive water recovery MEA (membrane electrode assembly). Developers at the University of North Florida identified water management components as an insurmountable barrier to achieving the required system size and weight necessary to achieve the energy density requirements of small portable power applications. UNF developed an innovative “passive water recovery” MEA for direct methanol fuel cells (DMFC) which provides a path to system simplification and optimization. The passive water recovery MEA incorporates a hydrophobic, porous, barrier layer within the cathode electrode, so that capillary pressure forces the water produced at the cathode through holes in the membrane and back to the anode. By directly transferring the water from the cathode to the anode, the balance of plant is very much simplified and the need for heavy, bulky water recovery components is eliminated. At the heart of the passive water recovery MEA is the UNF DM-1 membrane that utilizes a hydrocarbon structure to optimize performance in a DMFC system. The membrane has inherent performance advantages, such as a low methanol crossover (high overall efficiency), while maintaining a high proton conductivity (good electrochemical efficiency) when compared to perfluorinated sulfonic acid membranes such as Nafion. Critically, the membrane provides an extremely low electro-osmotic drag coefficient of approximately one water molecule per proton (versus the 2-3 for

  17. Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance

    SciTech Connect (OSTI)

    Kelkar, Mohan; Liner, Chris; Kerr, Dennis

    1999-10-15

    This final report describes the progress during the six year of the project on ''Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance.'' This report is funded under the Department of Energy's (DOE's) Class I program which is targeted towards improving the reservoir performance of mature oil fields located in fluvially-dominated deltaic deposits. The project involves using an integrated approach to characterize the reservoir followed by drilling of horizontal injection wells to improve production performance. The project was divided into two budget periods. In the first budget period, many modern technologies were used to develop a detailed reservoir management plan; whereas, in the second budget period, conventional data was used to develop a reservoir management plan. The idea was to determine the cost effectiveness of various technologies in improving the performance of mature oil fields.

  18. Improving Site-Specific Radiological Performance Assessments - 13431

    SciTech Connect (OSTI)

    Tauxe, John; Black, Paul; Catlett, Kate; Lee, Robert; Perona, Ralph; Stockton, Tom; Sully, Mike

    2013-07-01

    An improved approach is presented for conducting complete and defensible radiological site-specific performance assessments (PAs) to support radioactive waste disposal decisions. The basic tenets of PA were initiated some thirty years ago, focusing on geologic disposals and evaluating compliance with regulations. Some of these regulations were inherently probabilistic (i.e., addressing uncertainty in a quantitative fashion), such as the containment requirements of the U.S. Environmental Protection Agency's (EPA's) 40 CFR 191, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes, Chap. 191.13 [1]. Methods of analysis were developed to meet those requirements, but at their core early PAs used 'conservative' parameter values and modeling approaches. This limited the utility of such PAs to compliance evaluation, and did little to inform decisions about optimizing disposal, closure and long-term monitoring and maintenance, or, in general, maintaining doses 'as low as reasonably achievable' (ALARA). This basic approach to PA development in the United States was employed essentially unchanged through the end of the 20. century, principally by the U.S. Department of Energy (DOE). Performance assessments developed in support of private radioactive waste disposal operations, regulated by the U.S. Nuclear Regulatory Commission (NRC) and its agreement states, were typically not as sophisticated. Discussion of new approaches to PA is timely, since at the time of this writing, the DOE is in the midst of revising its Order 435.1, Radioactive Waste Management [2], and the NRC is revising 10 CFR 61, Licensing Requirements for Land Disposal of Radioactive Waste [3]. Over the previous decade, theoretical developments and improved computational technology have provided the foundation for integrating decision analysis (DA) concepts and objective-focused thinking, plus a Bayesian approach to

  19. Fuel Additivies for Improved Performance of Diesel Aftertreatment Systems |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Additivies for Improved Performance of Diesel Aftertreatment Systems Fuel Additivies for Improved Performance of Diesel Aftertreatment Systems 2002 DEER Conference Presentation: Ethyl 2002_deer_human.pdf (167.51 KB) More Documents & Publications Impact of Fuel-Borne Catalysts on Diesel Aftertreatment Diesel Particulate Filter: A Success for Faurecia Exhaust Systems Combination of Diesel fuel system architectures and Ceria-based fuel-borne catalysts for improvement

  20. Improving Compressed Air System Performance: A Sourcebook for Industry

    Office of Energy Efficiency and Renewable Energy (EERE)

    This sourcebook is designed to provide compressed air system users with a reference that outlines opportunities for system performance improvements. It is not intended to be a comprehensive technical text on improving compressed air systems, but rather a document that makes compressed air system users aware of the performance improvement potential, details some of the significant opportunities, and directs users to additional sources of assistance.

  1. Improving Performance of Federal Permitting and Review of Infrastructure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects | Department of Energy Improving Performance of Federal Permitting and Review of Infrastructure Projects Improving Performance of Federal Permitting and Review of Infrastructure Projects The U.S. Department of Energy's (DOE) Office of Electricity and Energy Reliability has built upon its ongoing effort to reflect the Obama Administration's commitment to improving the resiliency, reliability, and security of the nation's electricity delivery system by announcing the upcoming

  2. Improving Radar Antenna Performance with Eigenvalue Processing of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects | Department of Energy Improving Performance of Federal Permitting and Review of Infrastructure Projects Improving Performance of Federal Permitting and Review of Infrastructure Projects The U.S. Department of Energy's (DOE) Office of Electricity and Energy Reliability has built upon its ongoing effort to reflect the Obama Administration's commitment to improving the resiliency, reliability, and security of the nation's electricity delivery system by announcing the upcoming

  3. Long-term average performance benefits of parabolic trough improvements

    SciTech Connect (OSTI)

    Gee, R.; Gaul, H.W.; Kearney, D.; Rabl, A.

    1980-03-01

    Improved parabolic trough concentrating collectors will result from better design, improved fabrication techniques, and the development and utilization of improved materials. The difficulty of achieving these improvements varies as does their potential for increasing parabolic trough performance. The purpose of this analysis is to quantify the relative merit of various technology advancements in improving the long-term average performance of parabolic trough concentrating collectors. The performance benefits of improvements are determined as a function of operating temperature for north-south, east-west, and polar mounted parabolic troughs. The results are presented graphically to allow a quick determination of the performance merits of particular improvements. Substantial annual energy gains are shown to be attainable. Of the improvements evaluated, the development of stable back-silvered glass reflective surfaces offers the largest performance gain for operating temperatures below 150/sup 0/C. Above 150/sup 0/C, the development of trough receivers that can maintain a vacuum is the most significant potential improvement. The reduction of concentrator slope errors also has a substantial performance benefit at high operating temperatures.

  4. Improvement of Urea SCR Performance Using Wiremesh Thermolysis Mixer |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Improvement of Urea SCR Performance Using Wiremesh Thermolysis Mixer Improvement of Urea SCR Performance Using Wiremesh Thermolysis Mixer Wiremesh mixer development should bring harmony between injection, thermolysis, and mixing. deer08_rajadurai.pdf (215.31 KB) More Documents & Publications Wiremesh Substrates for Enhanced Particulate Oxidation and Efficient Urea SCR NOx Reduction SCR Performance Optimization Through Advancements in Aftertreatment Packaging Urea

  5. Benchmarking and performance improvement at Rocky Flats Technology Site

    SciTech Connect (OSTI)

    Elliott, C.; Doyle, G.; Featherman, W.L.

    1997-03-01

    The Rocky Flats Environmental Technology Site has initiated a major work process improvement campaign using the tools of formalized benchmarking and streamlining. This paper provides insights into some of the process improvement activities performed at Rocky Flats from November 1995 through December 1996. It reviews the background, motivation, methodology, results, and lessons learned from this ongoing effort. The paper also presents important gains realized through process analysis and improvement including significant cost savings, productivity improvements, and an enhanced understanding of site work processes.

  6. Recommendations for improvements to program and project management

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

  7. Measuring Performance and Benchmarking Project Management

    Energy Savers [EERE]

    implemented. Monthly 4. Project management staffing Is project staffing adequate in terms of number and qualifications? Assessment scale from 1 (poor) to 5 (excellent)....

  8. Report: Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management Submitted by the EMAB Acquisition and Project Management Subcommittee December 5, 2011 Introduction: This report provides a comprehensive summary of the work performed by the Acquisition and Project Management Subcommittee (APMS) of the

  9. Cummins Case Study Shows a 12.6% Improvement in Energy Performance with SEP

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Technical Assistance » Superior Energy Performance » Cummins Case Study Shows a 12.6% Improvement in Energy Performance with SEP Cummins Case Study Shows a 12.6% Improvement in Energy Performance with SEP August 6, 2015 - 11:38am Addthis A recently published case study examines the successes of Cummins Inc., a global engine manufacturer that implemented an energy management system (EnMS) that meets the requirements of ISO 50001 and Superior Energy Performance®

  10. Supervisory - Non-Supervisory Employee Performance Management and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recognition Program Desk Reference | Department of Energy Supervisory - Non-Supervisory Employee Performance Management and Recognition Program Desk Reference Supervisory - Non-Supervisory Employee Performance Management and Recognition Program Desk Reference This Desk Reference is designed to be used in conjunction with DOE O 331.1, Performance Management and Employee Recognition Programs. It was developed to provide uniformity to the interpretation of DOE O 331.1, and is intended to serve

  11. Lithium-Titanium-Oxide Anodes Improve Battery Safety and Performance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lithium-Titanium-Oxide Anodes Improve Battery Safety and Performance Technology available for licensing: Li4Ti5O12 spinel is a promising alternative to graphite electrodes with ...

  12. Improving Fan System Performance: A Sourcebook for Industry

    SciTech Connect (OSTI)

    2003-04-01

    This is one of a series of sourcebooks on motor-driven equipment produced by the Industrial Technologies Program. It provides a reference for industrial fan systems users, outlining opportunities to improve fan system performance.

  13. Improving Reactor Performance Rose Montgomery The Tennessee Valley...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Improving Reactor Performance Rose Montgomery The Tennessee Valley Authority Mark Uhran Oak Ridge National Laboratory April 9, 2013 CASL-U-2013-0034-001 CASL-U-2013-0034-001 ...

  14. Improving the Performance of OpenMP Using Lightweight Threads...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Improving the Performance of OpenMP Using Lightweight Threads Event Sponsor: Mathematics and Computing Science Seminar Start Date: Aug 28 2015 - 10:30am BuildingRoom: Building...

  15. U-137: HP Performance Manager Unspecified Bug Lets Remote Users...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    vulnerability has been identified with HP Performance Manager running on HP-UX, Linux, Solaris, and Windows. The vulnerability could be exploited remotely to execute...

  16. Using logic models in managing performance of research and technology...

    Office of Scientific and Technical Information (OSTI)

    Using logic models in managing performance of research and technology programs: An example for a Federal Energy Efficiency and Renewable Energy program Citation Details In-Document ...

  17. Request for Information on Improving Performance of Federal Permitting and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 168 - August 29, 2013 | Department of Energy Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 168 - August 29, 2013 Request for Information on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 168 - August 29, 2013 The Department of Energy's Office of Electricity Delivery and

  18. Furnace Blower Performance Improvements - Building America Top Innovation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Furnace Blower Performance Improvements - Building America Top Innovation Furnace Blower Performance Improvements - Building America Top Innovation This photo shows a circular-shaped blower fan for furnaces and air conditioners. As homeowners switch on their forced-air furnaces in preparation for cold weather, they may be unaware of how furnace blowers can impact HVAC efficiency. In fact, studies show that the most common blowers have efficiencies of only 10%-15%.

  19. Breakthrough Could Improve Turbine Performance, Reduce Carbon Emissions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Power Plants | Department of Energy Could Improve Turbine Performance, Reduce Carbon Emissions from Power Plants Breakthrough Could Improve Turbine Performance, Reduce Carbon Emissions from Power Plants April 26, 2016 - 8:03am Addthis Schematic Diagram of the Breakthrough Thermal Barrier Coating by “Solution Precursor Plasma Spray” Process Schematic Diagram of the Breakthrough Thermal Barrier Coating by "Solution Precursor Plasma Spray" Process Research supported by

  20. Extension of Comment Period on Improving Performance of Federal Permitting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 | Department of Energy Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 On August 29,

  1. PROJECT PROFILE: An Integrated Tool for Improving Grid Performance and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability of Combined Transmission-Distribution with High Solar Penetration (SuNLaMP) | Department of Energy PROJECT PROFILE: An Integrated Tool for Improving Grid Performance and Reliability of Combined Transmission-Distribution with High Solar Penetration (SuNLaMP) PROJECT PROFILE: An Integrated Tool for Improving Grid Performance and Reliability of Combined Transmission-Distribution with High Solar Penetration (SuNLaMP) Funding Program: SuNLaMP SunShot Subprogram: Systems Integration

  2. Performance improvement in a research and development facility

    SciTech Connect (OSTI)

    Forbes, R.J.; Hoke, P.B.

    1986-10-01

    This paper traces the development of the Performance Improvement Process at the Oak Ridge National Laboratory from a two-year pilot phase to the Laboratory's current program. The unique challenges associated with the introduction of an improvement program in a research and development community are also discussed.

  3. Nissan: Automaker improves energy performance 7.2% with a four-month payback using Superior Energy Performance

    Broader source: Energy.gov (indexed) [DOE]

    Learn more at energy.gov/betterbuildings/superior-energy-performance Case Study May 2015 HARBEC-a Specialty Plastics Manufacturer-Improves Energy Performance 16.5% with SEP HARBEC, Inc. worked with the U.S. Department of Energy (DOE) Advanced Manufacturing Office to successfully implement an energy management system (EnMS) that meets all requirements of ISO 50001 1 and Superior Energy Performance® (SEP TM ). HARBEC's implementation of the EnMS at its small plastics manufacturing facility in

  4. Benchmarking and Performance Improvement at Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Elliott, C. , Doyle, D. , Featherman, W.D.

    1997-12-31

    The Rocky Flats Environmental Technology Site (RFETS) has initiated a major work process improvement campaign using the tools of formalized benchmarking and streamlining. This paper provides insights into some of the process improvement activities performed at Rocky Flats from November 1995 through December 1996. It reviews the background, motivation, methodology, results, and lessons learned from this ongoing effort. The paper also presents important gains realized through process analysis and improvement including significant cost savings, productivity improvements, and an enhanced understanding of site work processes.

  5. POLICY GUIDANCE MEMORANDUM #29 Employment Offers Letters Performance Management

    Broader source: Energy.gov [DOE]

    This memorandum is to ensure compliance with DOE 0 331.lC, Employee Performance Management and Recognition Program, Section 4d {1)(d), and provide consistency throughout the Department in providing information to incoming employees on the applicability of the agency's performance management system.

  6. Congestion Management Requirements, Methods and Performance Indices

    SciTech Connect (OSTI)

    Kirby, B.J.

    2002-08-28

    Transmission congestion occurs when there is insufficient transmission capacity to simultaneously accommodate all requests for transmission service within a region. Historically, vertically integrated utilities managed this condition by constraining the economic dispatch of generators with the objective of ensuring security and reliability of their own and/or neighboring systems. Electric power industry restructuring has moved generation investment and operations decisions into the competitive market but has left transmission as a communal resource in the regulated environment. This mixing of competitive generation and regulated transmission makes congestion management difficult. The difficulty is compounded by increases in the amount of congestion resulting from increased commercial transactions and the relative decline in the amount of transmission. Transmission capacity, relative to peak load, has been declining in all regions of the U.S. for over a decade. This decline is expected to continue. Congestion management schemes used today have negative impacts on energy markets, such as disruptions and monetary penalties, under some conditions. To mitigate these concerns various congestion management methods have been proposed, including redispatch and curtailment of scheduled energy transmission. In the restructured electric energy industry environment, new congestion management approaches are being developed that strive to achieve the desired degree of reliability while supporting competition in the bulk power market. This report first presents an overview and background on key issues and emerging approaches to congestion management. It goes on to identify and describe policies affecting congestion management that are favored and/or are now being considered by FERC, NERC, and one of the regional reliability councils (WSCC). It reviews the operational procedures in use or proposed by three of the leading independent system operators (ISOs) including ERCOT

  7. Guidance on Basic Best Practices in Management of Energy Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings | Department of Energy on Basic Best Practices in Management of Energy Performance Buildings Guidance on Basic Best Practices in Management of Energy Performance Buildings Building energy management best practices 11_001_eecbg_sep_building_best_practice.pdf (206.26 KB) More Documents & Publications Energy Efficiency and Conservation Block Grant Financing Program Guidance Grantee Letter SEP Guidance National Energy Policy Act Guide for State Energy Program and Energy Efficiency

  8. Accreditation Management of Superior Energy Performance Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Since its inception, Superior Energy Performance (SEP) program accreditation has been ... DOE's Advanced Manufacturing Office will continue to act as the SEP Program Administrator. ...

  9. Intermetallic Electrodes Improve Safety and Performance in Lithium-Ion

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Batteries | Argonne National Laboratory Intermetallic Electrodes Improve Safety and Performance in Lithium-Ion Batteries Technology available for licensing: A new class of intermetallic material that can be used as a negative electrode for nonaqueous lithium electrochemical cells and batteries Enhances stability at a reduced cost. Materials operate by lithium insertion, metal displacement reactions, or both. Materials have higher volumetric and gravimetric capacity, and improve battery

  10. Hanford Site Waste Management Area C Performance Assessment (PA) Current

    Office of Environmental Management (EM)

    Status | Department of Energy Assessment (PA) Current Status Hanford Site Waste Management Area C Performance Assessment (PA) Current Status Marcel Bergeron Washignton River Protection Solutions Alaa Aly INTERA Performance and Risk Assessment Community of Practice Technical Exchange December 11-12, 2014 To view all the P&RA CoP 2014 Technical Exchange Meeting videos click here. Video Presentation - Part 1 Video Presentation - Part 2 Hanford Site Waste Management Area C Performance

  11. Taming the Wild World of Management, Performance and Communication - 13459

    SciTech Connect (OSTI)

    Ford, Laurie

    2013-07-01

    Management has evolved a long way from its original meaning of 'governing a horse'. The industrial revolution fostered 'scientific management'; 1930's Hawthorne studies discovered that people's social interactions could alter productivity; and the dawn of the computer age in the post-war 1950's brought general systems theory into management thinking. Today, mobile wireless connectivity aims to transform ever-changing networks of players, mandates, and markets into something that can be 'managed'. So why is there no clear and simple recipe for how to practice management? We talk about financial management, safety management, and operations management, but surely the 'management' part of those endeavors will share the same set of practices. Instead, we are still arguing for 'management' to include everything from developing people to negotiating contracts. A manager's job may include many things, but one of them, the job of management, needs to be nailed down. Three standard practices for managing in a network are developed: (a) support the dialogues that connect people vital to accomplishing a goal or objective; (b) develop and sustain the scoreboards that serve as a road-map to reach the goal; and (c) control the feedback to 'govern the horse'. These three practices are useful for more than reaching goals, as they also support coordinating across boundaries and running productive meetings. The dialogues for productive relationships, scoreboards for goals and deliverables, and feedback for performance together constitute a recipe for managing in a networked world. (authors)

  12. Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance

    SciTech Connect (OSTI)

    Chris Liner; Dennis Kerr; Mohan Kelkar

    1998-09-30

    Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance The overall purpose of the proposed project is to improve secondary recovery performance of a marginal oil field through the use of an appropriate reservoir management plan. The selection of plan will be based on the detailed reservoir description using an integrated approach. We expect that 2 to 5% of the original oil in place will be recovered using this method. This should extend the life of the reservoir by at least 10 years. The project is divided into two stages. In Stage I of the project, we selected part of the Glenn Pool Field - Self Unit. We conducted cross borehole tomography surveys and formation micro scanner logs through a newly drilled well. By combining the state-of-the-art data with conventional core and log data, we developed a detailed reservoir description based on an integrated approach. After conducting extensive reservoir simulation studies, we evaluated alternate reservoir management strategies to improve the reservoir performance including drilling of a horizontal injection well. We observed that selective completion of many wells followed by an increase in the injection rate was the most feasible option to improve the performance of the Self Unit. This management plan is currently being implemented and the performance is being monitored. Stage II of the project will involve selection of part of the same reservoir (Berryhill Unit - Tract 7), development of reservoir description using only conventional data, simulation of flow performance using developed reservoir description, selection of an appropriate reservoir management plan, and implementation of the plan followed by monitoring of reservoir performance.

  13. Using an automated code management system to improve configuration control practices

    SciTech Connect (OSTI)

    Meyer, S.

    1997-11-01

    This report contains viewgraphs on using an automated code management system to improve configuration control practice.

  14. Improved spare-parts management can yield outstanding savings

    SciTech Connect (OSTI)

    Hefter, G.

    1980-10-01

    The importance of maintaining a spare-parts supply is often overlooked as a factor in power plant availability. A spare-parts-management program is described which evaluates the processes of selection, stock level assignment, purchasing, quality control, obtaining parts, replenishing, and periodic review. The importance of computerization is noted. A management program should review each of these functional areas and the users at each level in order to be effective. The benefits of lower purchasing costs and improvement in plant availability and worker productivity should significantly outweigh the costs of the analysis and changes. (DCK)

  15. Potential improvements in SiGe radioisotope thermoelectric generator performance

    SciTech Connect (OSTI)

    Mowery, A.L.

    1999-01-01

    In accordance with NASA{close_quote}s slogan: {open_quotes}Better, Cheaper, Faster,{close_quotes} this paper will address potential improvements to SiGe RTG technology to make them Better. RTGs are doubtless cheaper than {open_quotes}paper designs{close_quotes} which are better and cheaper until development, performance and safety test costs are considered. RTGs have the advantage of being fully developed and tested in the rigors of space for over twenty years. Further, unless a new system can be accelerated tested, as were the RTGs, they cannot be deployed reliably unless a number of systems have succeeded for test periods exceeding the mission lifetime. Two potential developments are discussed that can improve the basic RTG performance by 10 to 40{sup +}{percent} depending on the mission profile. These improvements could be demonstrated in years. Accelerated testing could also be performed in this period to preserve existing RTG reliability. Data from a qualification tested RTG will be displayed, while not definitive, to support the conclusions. Finally, it is anticipated that other investigators will be encouraged to suggest further modifications to the basic RTG design to improve its performance. {copyright} {ital 1999 American Institute of Physics.}

  16. Award Fee Determination Shows Performance Improvement in WTP Contractor

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM Office of River Protection (ORP) Waste Treatment and Immobilization Plant (WTP) contractor Bechtel National Inc. improved its performance slightly in calendar year 2015 compared to the last half of 2014, earning 66 percent of its possible award fee, or $8.31 million out of a possible $12.6 million.

  17. Condenser performance test and back-pressure improvement: Final report

    SciTech Connect (OSTI)

    Piskorowski, J.; Beckett, G.; Bell, R.

    1988-04-01

    This document describes condenser performance test and analyses experiences. The testing was performed by Indianapolis Power and Light Company (IPL) on the Petersburg Unit 3 condenser. The initial testing revealed a performance deficiency. Modifications were made to the condenser, air in-leakage was reduced and the vacuum pumps were brought back to their original design capacity. Testing was reperformed after these activities and although a significant performance improvement was achieved deficiencies were still evident. Heat Exchanger Systems, Inc. (HES) was retained as consultants during this testing program. The Central Electricity Generating Board's (CEGB) Central Electricity Research Laboratory (CERL) acting as a subcontractor to HES were retained to perform an analysis of the Petersburg Unit 3 condenser using their EPOC computer code. The results of this analysis are also contained in this document. 3 refs., 48 figs., 3 tabs.

  18. Improving Remedial Effectiveness at U.S. Department of Energy through Optimization Review and Performance Basis

    SciTech Connect (OSTI)

    Moore, B.A.

    2008-07-01

    The U.S. Department of Energy (DOE), Office of Environmental Management (EM) conducted its first Remediation Process Optimization (RPO) review in 2004, following the methodology and guidance issued by the Interstate Technology and Regulatory Council (ITRC). The intent of this paper is to briefly summarize the following: (1) the overall benefits of the review process toward improving remedial effectiveness and efficiency at DOE, (2) the types and objectives of completed reviews, and (3) how RPO facilitates technology transfer and is complementary to performance-based environmental management (PBEM). Contract reform began in 1993, at the U.S. Department of Energy (DOE) as a result of the Government Performance and Results Act, followed by recommendations from oversight groups. The precedence of using management and operating (M and O) contracts at DOE facilities, exempt from open competition by definition, shifted to performance basis. Since 1994, DOE has competed over 70% of its then existing M and O contracts; most now contain specific performance objectives, measures, and targets that focus on results in mission critical areas. In 2001, DOE's Office of Environmental Management (EM) integrated performance-based contracting as a core business process. EM resolved to manage cleanup as a project, encourage innovative contracting strategies, as well as incentives to accelerate risk reduction and cleanup. DOE's efforts to implement performance-based environmental management (PBEM) were further realized by establishing a centralized Office of Acquisitions and the Consolidated Business Center, which support all EM procurements. In 2004, EM began conducting Remediation Process Optimization (RPO) reviews at select field sites, following the methodology published in the 2004 ITRC guidance. To date, EM has completed nine RPO reviews, including: pump and treat system optimization, monitoring program optimization, in situ barrier performance improvement, remedial design review

  19. Transcript, Keeping the Edge: Enhancing Performance by Managing Culture

    Broader source: Energy.gov [DOE]

    Transcript: 2003 INPO CEO Conference, Keeping the Edge: “Enhancing Performance by Managing Culture” Edgar H. Schein, Ph.D. Professor Emeritis, Massachusetts Institute of Technology November 7, 2003

  20. Security and Emergency Management Independent Oversight and Performance Assurance Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-03-01

    Establishes the DOE Security and Emergency Management Independent Oversight and Performance Assurance Program. Cancels DOE O 470.2, Paragraph 5b(2) of DOE O 231.1 and Chapter IV of DOE M 231.1-1.

  1. Office of the Under Secretary for Management and Performance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Office of the Under Secretary for Management and Performance Office of the Under Secretary for Management and Performance EM's Award-Winning Projects Save More Than $10 Million, Advance Sustainability at Department of Energy EM's Award-Winning Projects Save More Than $10 Million, Advance Sustainability at Department of Energy Two EM projects that spared resources, increased the efficiency of radioactive waste processing, and saved more than $10.6 million were honored as recipients

  2. Nanotube composite anode materials improve lithium-ion battery performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (ANL-09-034) - Energy Innovation Portal Vehicles and Fuels Vehicles and Fuels Energy Storage Energy Storage Find More Like This Return to Search Nanotube composite anode materials improve lithium-ion battery performance (ANL-09-034) Argonne National Laboratory Contact ANL About This Technology Technology Marketing Summary Rechargeable lithium-ion batteries are a critical technology for many applications, including consumer electronics and electric vehicles. As the demand for hybrid and

  3. Lithium-Titanium-Oxide Anodes Improve Battery Safety and Performance |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argonne National Laboratory Lithium-Titanium-Oxide Anodes Improve Battery Safety and Performance Technology available for licensing: Li4Ti5O12 spinel is a promising alternative to graphite electrodes with enhanced conductivity, voltage and energy density. Enhanced stability at lower cost Li4Ti5O12 spinel is a promising alternative to graphite electrodes with enhanced conductivity, voltage and energy density PDF icon LTO_anodes

  4. BigHorn Home Improvement Center Energy Performance: Preprint

    SciTech Connect (OSTI)

    Deru, M.; Pless, S.; Torcellini, P.

    2006-04-01

    This is one of the nation's first commercial building projects to integrate extensive high-performance design into a retail space. The extensive use of natural light, combined with energy-efficient electrical lighting design, provides good illumination and excellent energy savings. The reduced lighting loads, management of solar gains, and cool climate allow natural ventilation to meet the cooling loads. A hydronic radiant floor system, gas-fired radiant heaters, and a transpired solar collector deliver heat. An 8.9-kW roof-integrated photovoltaic (PV) system offsets a portion of the electricity.

  5. Using Process Safety Management to improve plant operability

    SciTech Connect (OSTI)

    Sutton, I.S.

    1995-12-31

    The Process Safety Management (PSM) standard, 29 CFR 1910.119, was published in draft from in July 1990 and has been in force since May 1992. The standard requires that all companies that handle hazardous materials must have in place a management program to minimize the chance of accidents, and to reduce the consequences of such accidents should they occur. The purpose of this paper is to provide some preliminary guidance as to how PSM activities can be managed so that, as the compliance part of the work is completed, the best return on the investment can be achieved. One final point should be made about safety and operability. The two are closely linked, but they are not identical. In other words, a safety improvement program will almost certainly lead to reduced economic losses, similarly a reliability improvement program will almost certainly reduce injuries, but there are some differences that need to be taken account. These include: (1) Additional safety equipment may reduce reliability. (2) A reliable plant does not undergo many shutdowns. Therefore, operators have less practice with the implementation of shutdown and startup procedures than they would otherwise. (3) Unsafe engineering practices, such as the use of temporary bypasses and jumper lines, may increase operability, but they reduce safety.

  6. Integrated approach towards the application of horizontal wells to improve waterflooding performance. Annual report

    SciTech Connect (OSTI)

    Kelkar, M.; Liner, C.; Kerr, D.

    1995-05-01

    This annual report describes the progress during the second year of the project on Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance. This project is funded under the Department of Energy`s Class I program which is targeted towards improving the reservoir performance of mature oil fields located in fluvial-dominated deltaic deposits. The project involves an integrated approach to characterize the reservoir followed by the drilling of horizontal injection wells to improve production performance. The type of data we have integrated include cross bore hole seismic surveys, geological interpretation based on logs and cores, and engineering information. This report covers the second phase of the project which includes a detailed reservoir description of the field by integrating all the available information, followed by flow simulation of the Self Unit under various operating conditions. Based on an examination of the various operating parameters, we observed that the best possible solution to improve the Self Unit performance is to recomplete and stimulate most of the wells followed by an increase in the water injection rate. Drilling of horizontal injection well, although helpful in improving the performance, was not found to be economically feasible. The proposed reservoir management plan will be implemented shortly.

  7. Improved Thermophotovoltaic (TPV) Performance Using Dielectric Photon Concentrations (DPC)

    SciTech Connect (OSTI)

    P.F. Baldasaro; P.M. Fourspring

    2003-01-03

    This report presents theoretical and experimental results, which demonstrate the feasibility of a new class of thermophotovoltaic (TPV) energy converters with greatly improved power density and efficiency. Performance improvements are based on the utilization of the enhanced photon concentrations within high refractive index materials. Analysis demonstrates that the maximum achievable photon flux for TPV applications is limited by the lowest index in the photonic cavity, and scales as the minimum refraction index squared, n{sup 2}. Utilization of the increased photon levels within high index materials greatly expands the design space limits of TPV systems, including: a 10x increase in power density, a 50% fractional increase in conversion efficiency, or alternatively reduced radiator temperature requirements to as low as {approx} 1000 F.

  8. Nanofilm Coatings Improve Battery Performance - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Storage Energy Storage Advanced Materials Advanced Materials Find More Like This Return to Search Nanofilm Coatings Improve Battery Performance Argonne National Laboratory Contact ANL About This Technology <p> TEM 2.5-nm-thick nano-coated ultrathin film on lithium-ion cathode particle surface; coating is highly uniform, in contrast to films applied through conventional technology (for reference, bar in lower-left corner measures 5 nm)</p> TEM 2.5-nm-thick nano-coated ultrathin

  9. New MEA Materials for Improved DMFC Performance, Durability and Cost

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MEA Materials for Improved DMFC Performance, Durability and Cost Kick-Off Meeting PolyFuel Friday, August 21, 2009 Philip Cox Vice President, Product Development This presentation does not contain any proprietary, confidential, or otherwise restricted information Project Overview and Partners * Two and half years - Target: November 2009 through May 2012 - Project not yet started * Budget - Total: $3,116,971; DOE: $2,493,577 - Year 1 - $ 1,610,241 DOE: $ 322,048 - Year 2 - $ 1,506,730 DOE $

  10. Silver particles improve performance of battery material | Argonne National

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Silver particles improve performance of battery material December 16, 2014 Tweet EmailPrint Researchers at the U.S. Department of Energy's Argonne National Laboratory are working to create an electric car battery that is smaller, cheaper and allows drivers to go farther on a charge. Materials scientist Larry Curtiss is part of an Argonne team working on a new battery architecture that uses lithium-oxygen bonds as it stores and releases energy, and silver as the metal catalyst that

  11. Intermetallic Electrodes Improve Safety and Performance in Lithium-ion

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Batteries - Energy Innovation Portal Intermetallic Electrodes Improve Safety and Performance in Lithium-ion Batteries Argonne National Laboratory Contact ANL About This Technology <span style="font-family: &quot;Cambria&quot;,&quot;serif&quot;; font-size: 12pt; mso-fareast-font-family: Cambria; mso-bidi-font-family: &quot;Times New Roman&quot;; mso-ansi-language: EN-US; mso-fareast-language: EN-US; mso-bidi-language: AR-SA;"><em><font

  12. Secretarial Memorandum on Integrating Project Management with NEPA Compliance to Improve Decision Making

    Broader source: Energy.gov [DOE]

    Declaring that “Compliance with [NEPA] is a pre-requisite to successful implementation of DOE programs and projects,” the Secretary has signed a memorandum on "Improved Decision Making through the Integration of Program and Project Management with National Environmental Policy Act Compliance." The memo urges better use of existing tools and guidance, and highlights principles for strengthening NEPA compliance – for example, through Field and Headquarters teamwork, realistic schedules, and performance accountability.

  13. Tennessee: U.S. Automaker Improves Plant's Performance, Saves...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A central element of SEP is to implement the global energy management standard, ISO 50001, ... manufacturing plant-implementing the ISO 50001 energy management system (EnMS) ...

  14. Microsoft PowerPoint - FY2016 SES Performance Management Training.pptx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Service (SES) Performance Management Training Table of Contents * Overview * Planning Performance * Monitoring and Developing Performance * Rating Performance * Rewarding Performance * Executive Resources Points of Contact 1 Overview Performance Management Planning Performance 1 Oct 15 Monitoring Performance (Ongoing) & Progress Review Apr 16 Developing Performance Ongoing Rating Performance 30 Sep 16 Rewarding Performance Nov 16 - Jan 17 2 Overview Key Features * Five Critical

  15. Microsoft PowerPoint - FY2016 Senior Professional Performance Management Training.pptx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Professional Performance Management Training Table of Contents * Overview * Planning Performance * Monitoring and Developing Performance * Rating Performance * Rewarding Performance * Executive Resources Points of Contact 1 Overview Performance Management Planning Performance 1 Oct 15 Monitoring Performance (Ongoing) & Progress Reviews Apr 16 Developing Performance Ongoing Rating Performance 30 Sep 16 Rewarding Performance Nov 16 - Jan 17 2 Overview Key Features * Assessed on Two Critical

  16. Plasma Aerodynamic Control Effectors for Improved Wind Turbine Performance

    SciTech Connect (OSTI)

    Mehul P. Patel; Srikanth Vasudevan; Robert C. Nelson; Thomas C. Corke

    2008-08-01

    Orbital Research Inc is developing an innovative Plasma Aerodynamic Control Effectors (PACE) technology for improved performance of wind turbines. The PACE system is aimed towards the design of "smart" rotor blades to enhance energy capture and reduce aerodynamic loading and noise using flow-control. The PACE system will provide ability to change aerodynamic loads and pitch distribution across the wind turbine blade without any moving surfaces. Additional benefits of the PACE system include reduced blade structure weight and complexity that should translate into a substantially reduced initial cost. During the Phase I program, the ORI-UND Team demonstrated (proof-of-concept) performance improvements on select rotor blade designs using PACE concepts. Control of both 2-D and 3-D flows were demonstrated. An analytical study was conducted to estimate control requirements for the PACE system to maintain control during wind gusts. Finally, independent laboratory experiments were conducted to identify promising dielectric materials for the plasma actuator, and to examine environmental effects (water and dust) on the plasma actuator operation. The proposed PACE system will be capable of capturing additional energy, and reducing aerodynamic loading and noise on wind turbines. Supplementary benefits from the PACE system include reduced blade structure weight and complexity that translates into reduced initial capital costs.

  17. Performance improvement options for the supercritical carbon dioxide brayton cycle.

    SciTech Connect (OSTI)

    Moisseytsev, A.; Sienicki, J. J.; Nuclear Engineering Division

    2008-07-17

    The supercritical carbon dioxide (S-CO{sub 2}) Brayton cycle is under development at Argonne National Laboratory as an advanced power conversion technology for Sodium-Cooled Fast Reactors (SFRs) as well as other Generation IV advanced reactors as an alternative to the traditional Rankine steam cycle. For SFRs, the S-CO{sub 2} Brayton cycle eliminates the need to consider sodium-water reactions in the licensing and safety evaluation, reduces the capital cost of the SFR plant, and increases the SFR plant efficiency. Even though the S-CO{sub 2} cycle has been under development for some time and optimal sets of operating parameters have been determined, those earlier development and optimization studies have largely been directed at applications to other systems such as gas-cooled reactors which have higher operating temperatures than SFRs. In addition, little analysis has been carried out to investigate cycle configurations deviating from the selected 'recompression' S-CO{sub 2} cycle configuration. In this work, several possible ways to improve S-CO{sub 2} cycle performance for SFR applications have been identified and analyzed. One set of options incorporates optimization approaches investigated previously, such as variations in the maximum and minimum cycle pressure and minimum cycle temperature, as well as a tradeoff between the component sizes and the cycle performance. In addition, the present investigation also covers options which have received little or no attention in the previous studies. Specific options include a 'multiple-recompression' cycle configuration, intercooling and reheating, as well as liquid-phase CO{sub 2} compression (pumping) either by CO{sub 2} condensation or by a direct transition from the supercritical to the liquid phase. Some of the options considered did not improve the cycle efficiency as could be anticipated beforehand. Those options include: a double recompression cycle, intercooling between the compressor stages, and reheating

  18. A metrological large range atomic force microscope with improved performance

    SciTech Connect (OSTI)

    Dai, Gaoliang; Wolff, Helmut; Pohlenz, Frank; Danzebrink, Hans-Ulrich

    2009-04-15

    A metrological large range atomic force microscope (Met. LR-AFM) has been set up and improved over the past years at Physikalisch-Technische Bundesanstalt (PTB). Being designed as a scanning sample type instrument, the sample is moved in three dimensions by a mechanical ball bearing stage in combination with a compact z-piezostage. Its topography is detected by a position-stationary AFM head. The sample displacement is measured by three embedded miniature homodyne interferometers in the x, y, and z directions. The AFM head is aligned in such a way that its cantilever tip is positioned on the sample surface at the intersection point of the three interferometer measurement beams for satisfying the Abbe measurement principle. In this paper, further improvements of the Met. LR-AFM are reported. A new AFM head using the beam deflection principle has been developed to reduce the influence of parasitic optical interference phenomena. Furthermore, an off-line Heydemann correction method has been applied to reduce the inherent interferometer nonlinearities to less than 0.3 nm (p-v). Versatile scanning functions, for example, radial scanning or local AFM measurement functions, have been implemented to optimize the measurement process. The measurement software is also improved and allows comfortable operations of the instrument via graphical user interface or script-based command sets. The improved Met. LR-AFM is capable of measuring, for instance, the step height, lateral pitch, line width, nanoroughness, and other geometrical parameters of nanostructures. Calibration results of a one-dimensional grating and a set of film thickness standards are demonstrated, showing the excellent metrological performance of the instrument.

  19. Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance

    SciTech Connect (OSTI)

    Chris Liner; Dennis Kerr; Mohan Kelkar

    1998-06-30

    Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance scanner logs through a newly drilled well. By combining the state-of-the-art data with conventional core and log data, we developed a detailed reservoir description based on an integrated approach. After conducting extensive reservoir simulation studies, we evaluated alternate reservoir management strategies to improve the reservoir performance including drilling of a horizontal injection well. We observed that selective completion of many wells followed by an increase in the injection rate was the most feasible option to improve the performance of the Self Unit. This management plan is currently being implemented and the performance is being Stage II of the project will involve selection of part of the same reservoir (Berryhill Unit - Tract 7), development of reservoir description using only conventional data, simulation of flow performance using developed reservoir description, selection of an appropriate reservoir management plan, and implementation of the plan followed by monitoring of reservoir performance. During the summer of 1995, we started implementing the reservoir management plan in the Self Unit. Last quarter, after evaluating each individual well, we decided to install electrical submersible pumps to produce three wells. The other three wells required the use of rod pumps. Production from the field improved significantly once the pumps were installed. Over the last two years, an average daily production has been approximately 40 to 45 bbls/day. Compared to a base line production of 13 bbls/day before the implementation, this is more than a 200% increase in production. determined. We are finalizing the AFE for the overall implementation. This overall implementation will include converting well no 61 into an injector, re-perforating wells M-3A and M-4A, and drilling a deviated production well between 61 and M-3A/M-4A i n east west direction. The total

  20. Recovery Act: Electrochromic Glazing Technology: Improved Performance, Lower Price

    SciTech Connect (OSTI)

    Burdis, Mark; Sbar, Neil

    2012-06-30

    The growing dependency of the US on energy imports and anticipated further increases in energy prices reinforce the concerns about meeting the energy demand in the future and one element of a secure energy future is conservation. It is estimated that the buildings sector represents 40% of the US's total energy consumption. And buildings produce as much as one third of the greenhouse gas emissions primarily through fossil fuel usage during their operational phase. A significant fraction of this energy usage is simply due to inefficient window technology. Electrochromic (EC) windows allow electronic control of their optical properties so that the transparency to light can be adjusted from clear to dark. This ability to control the amount of solar energy allowed into the building can be advantageously used to minimize lighting, heating and air conditioning costs. Currently, the penetration of EC windows into the marketplace is extremely small, and consequently there is a huge opportunity for energy savings if this market can be expanded. In order to increase the potential energy savings it is necessary to increase the quantity of EC windows in operation. Additionally, any incremental improvement in the energy performance of each window will add to the potential energy savings. The overall goals of this project were therefore to improve the energy performance and lower the cost of dynamic (EC) smart windows for residential and commercial building applications. This project is obviously of benefit to the public by addressing two major areas: lowering the cost and improving the energy performance of EC glazings. The high level goals for these activities were: (i) to improve the range between the clear and the tinted state, (ii) reduce the price of EC windows by utilizing lower cost materials, (iii) lowering the U-Value1 SAGE Electrochromics Inc. is the only company in the US which has a track record of producing EC windows, and presently has a small operational factory

  1. Technologies for improved soil carbon management and environmental quality

    SciTech Connect (OSTI)

    Reicosky, D.C.

    1997-12-31

    The objective of this paper is to create an environmental awareness of and to provide insight into the future balance of environment and economic issues in developing new technologies that benefit the farmer, the public, and agricultural product sales. Agricultural impacts of tillage-induced CO{sub 2} losses are addressed along with new and existing technologies to minimize tillage-induced flow of CO{sub 2} to the atmosphere, Emphasis is placed on the carbon cycle and the cost of environmental damage to illustrate the need for improved technologies leading to reduced environmental impacts by business ventures. New technologies and concepts related to methods of tillage and stover management for carbon sequestration with the agricultural production systems are presented. 16 refs., 3 figs.

  2. METHOD AND APPARATUS FOR IMPROVING PERFORMANCE OF A FAST REACTOR

    DOE Patents [OSTI]

    Koch, L.J.

    1959-01-20

    A specific arrangement of the fertile material and fissionable material in the active portion of a fast reactor to achieve improvement in performance and to effectively lower the operating temperatures in the center of the reactor is described. According to this invention a group of fuel elements containing fissionable material are assembled to form a hollow fuel core. Elements containing a fertile material, such as depleted uranium, are inserted into the interior of the fuel core to form a central blanket. Additional elemenis of fertile material are arranged about the fuel core to form outer blankets which in tunn are surrounded by a reflector. This arrangement of fuel core and blankets results in substantial flattening of the flux pattern.

  3. FY 2008 Overall Contract and Project Management Improvement Performance

    Energy Savers [EERE]

    FY 2007 Budget Highlights FY 2007 Congressional Budget Request (972.26 KB) More Documents & Publications FY 2007 Budget Justification FY 2007 Congressional Budget Request FY 2006 Budget Justification

    Budget Request FY 2007 Congressional Budget Request Laboratory Tables for the Department of Energy's 2007 Congressional budget. FY 2007 Congressional Budget Request (322.44 KB) More Documents & Publications FY 2007 Congressional

    Request FY 2007 Congressional Request FY 2007

  4. FY 2010 Overall Contract and Project Management Improvement Performance

    Energy Savers [EERE]

    State Tables Preliminary February 2008 Office of Chief Financial Officer Department of Energy FY 2009 Congressional Budget Request State Tables Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. The figures include both the discretionary and mandatory funding in the budget. They do not consider revenues/receipts, use of prior year balances, deferrals, rescissions, or other adjustments appropriated as offsets to the DOE

  5. FY 2013 Overall Contract and Project Management Improvement Performance

    Energy Savers [EERE]

    0 Volume 4 Department of Energy FY 2012 Congressional Budget Request Science Science February 2011 Office of Chief Financial Officer Volume 4 DOE/CF-0060 Volume 4 Department of Energy FY 2012 Congressional Budget Request Science Science February 2011 Office of Chief Financial Officer Volume 4 Printed with soy ink on recycled paper Department of Energy/ Science FY 2012 Congressional Budget Volume 4 Table of Contents Page Appropriation Account Summary

  6. FY 2014 Overall Contract and Project Management Improvement Performance

    Energy Savers [EERE]

    Excess Elimination Report FINAL FY 2014 Excess Elimination Report FINAL FY 2014 Excess Elimination Report FINAL.PDF (935.35 KB) More Documents & Publications FY 2013 Excess Elimination Report UCOR Contract & Fee Determination EA-1451: Final Environmental Assessment

    Federal Real Property Reporting Requirement FY 2014 Federal Real Property Reporting Requirement FIMS FRPP FY 2014 Reporting Instructions Signed Sep 18 2014 .pdf (6.19 MB) More Documents & Publications Guidance for

  7. Self-assessed performance improves statistical fusion of image labels

    SciTech Connect (OSTI)

    Bryan, Frederick W. Xu, Zhoubing; Asman, Andrew J.; Allen, Wade M.; Reich, Daniel S.; Landman, Bennett A.

    2014-03-15

    . Statistical fusion resulted in statistically indistinguishable performance from self-assessed weighted voting. The authors developed a new theoretical basis for using self-assessed performance in the framework of statistical fusion and demonstrated that the combined sources of information (both statistical assessment and self-assessment) yielded statistically significant improvement over the methods considered separately. Conclusions: The authors present the first systematic characterization of self-assessed performance in manual labeling. The authors demonstrate that self-assessment and statistical fusion yield similar, but complementary, benefits for label fusion. Finally, the authors present a new theoretical basis for combining self-assessments with statistical label fusion.

  8. Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance

    SciTech Connect (OSTI)

    Kelkar, M.; Kerr, D.

    1999-04-17

    This report is funded under the Department of Energy's Class I program which is targeted towards improving the reservoir performance of mature oil fields located in fluvially dominated deltaic geological environments. The project involves using an integrated approach to characterize the reservoir followed by proposing an approach reservoir management strategy to improve the field performance. In the first stage of the project, the type of data integrated includes cross bore hole seismic surveys, geological interpretation based on the logs and the cores, and the engineering information. In contrast, during the second stage of the project, it was intended to use only conventional data to construct the reservoir description. This report covers the results of the implementation from the first state of the project. It also discusses the work accomplished so far to the second stage of the project . The production from the Shelf Unit (location of Stage I) has sustained a significant increase over more than three years.

  9. Energy Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Management Utilize energy efficiency to improve your industrial customer's business performance without the cost of major capital improvements. Energy efficiency is not...

  10. Improved LWR Cladding Performance by EPD Surface Modification Technique

    SciTech Connect (OSTI)

    Corradini, Michael; Sridharan, Kumar

    2012-11-26

    This project will utilize the electro-phoretic deposition technique (EPD) in conjunction with nanofluids to deposit oxide coatings on prototypic zirconium alloy cladding surfaces. After demonstrating that this surface modification is reproducible and robust, the team will subject the modified surface to boiling and corrosion tests to characterize the improved nucleate boiling behavior and superior corrosion performance. The scope of work consists of the following three tasks: The first task will employ the EPD surface modification technique to coat the surface of a prototypic set of zirconium alloy cladding tube materials (e.g. Zircaloy and advanced alloys such as M5) with a micron-thick layer of zirconium oxide nanoparticles. The team will characterize the modified surface for uniformity using optical microscopy and scanning-electron microscopy, and for robustness using standard hardness measurements. After zirconium alloy cladding samples have been prepared and characterized using the EPD technique, the team will begin a set of boiling experiments to measure the heat transfer coefficient and critical heat flux (CHF) limit for each prepared sample and its control sample. This work will provide a relative comparison of the heat transfer performance for each alloy and the surface modification technique employed. As the boiling heat transfer experiments begin, the team will also begin corrosion tests for these zirconium alloy samples using a water corrosion test loop that can mimic light water reactor (LWR) operational environments. They will perform extended corrosion tests on the surface-modified zirconium alloy samples and control samples to examine the robustness of the modified surface, as well as the effect on surface oxidation

  11. Improving Mission Execution by Integrating our Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-10-03

    Request for analysis and preliminary set of alternatives for the integration of management systems within DOE.

  12. Summary - Remedial System Performance Improvement for the 200-ZP-1_PW-1 OU1 at Hanford

    Office of Environmental Management (EM)

    200-ZP-1/PW-1 Operable Units ETR Report Date: February 2007 ETR-5 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review Remedial System Performance Improvement for the 200-ZP-1/PW-1 Operable Units at Hanford Why DOE-EM Did This Review The 200-ZP-1 OU and PW-1 OU are pump and treat operating units (OU) designed to remove carbon tetrachloride (CT) from the groundwater and vadose zone, respectively. The units support a Comprehensive Environmental

  13. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast ...

  14. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 ...

  15. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast ...

  16. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Final FY ...

  17. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 ...

  18. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & ...

  19. Improving cogeneration plant performance through effective maintenance strategies

    SciTech Connect (OSTI)

    Sheikh, S.M.

    1998-12-31

    Gas-fired cogeneration plants supplying power and thermal energy make up an increasing percentage of new fossil generation capacity additions, both in the US and overseas. These plants are popular, not only because they cost less to build, but also because they are highly efficient and their operation and maintenance costs are lower than plants using the traditional coal-based Rankine cycle. One of the methods being used to contain the initial cost of building cogeneration plants is to minimize redundancy both in the quantity of spare equipment specified for the various systems in the plants and in the design capacity of individual components. The overall effect of such a strategy may lead to reduced reliability and availability of the cogeneration plant in the long term. Operating cogeneration plants present a variety of technologies, equipment, and operating practices. While newer cogeneration plants routinely operate at a reliability of 90% or higher, older plants may not be able to achieve such performance due to excessive equipment breakdowns or inadequate maintenance strategies. By not having the appropriate maintenance programs in place, even newer cogeneration plants are vulnerable to deteriorating reliability and availability in the long term. This paper describes mechanisms for directing maintenance resources toward reducing current maintenance costs while maintaining high availability without sacrificing long-term reliability. The maintenance strategies discussed are those that can provide the maximum benefits for improving cogeneration plant reliability, availability, capacity, cost control, and safety.

  20. Improving Pumping System Performance: A Sourcebook for Industry - Second Edition

    SciTech Connect (OSTI)

    2006-05-01

    This sourcebook contains the practical guidelines and information manufacturers need to improve the efficiency of their pumping systems.

  1. Superior Energy Performance: Getting the Most Value from ISO 50001-Energy Management Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Superior Energy Performance cm : Getting the Most Value from ISO 50001- Energy Management Systems US Department of Energy Advanced Manufacturing Office March 13, 2012 Aimee McKane Lawrence Berkeley National Laboratory 2 | Industrial Energy Efficiency eere.energy.gov * Time and again, industrial energy efficiency has been demonstrated to be cost effective while having a positive effect on productivity * Despite this, energy efficiency improvements with very favorable payback periods often do not

  2. Improving Pumping System Performance: A Sourcebook for Industry...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... used primarily in heating, ventilation, and ... Improve Pumping System Efficiency Hanger Horizontal split casing pump ... coincides with the natural frequency of any ...

  3. Improving Performance of Federal Permitting and Review of Infrastructu...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    its ongoing effort to reflect the Obama Administration's commitment to improving the resiliency, reliability, and security of the nation's electricity delivery system by announcing ...

  4. PV Performance Modeling Collaborative's New and Improved Website...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modeling Collaborative's New and Improved Website Is Launched - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & ...

  5. Summary - Remedial System Performance Improvement for the 200...

    Office of Environmental Management (EM)

    zone extraction systems with the objective of identifying improvements as input to a Feasibility Study supporting the Final Record of Decision. What the ETR Team Recommended The...

  6. Improving Pumping System Performance: A Sourcebook for Industry, Second Edition

    SciTech Connect (OSTI)

    Not Available

    2006-05-01

    Prepared for the DOE Industrial Technologies Program, this sourcebook contains the practical guidelines and information manufacturers need to improve the efficiency of their pumping systems.

  7. Nissan: Automaker improves energy performance 7.2% with a four...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    USA, Superior Energy Performance Nissan Automaker improves energy performance 7.2% with a ... Nissan's corporate Green Program 2016 promotes sustainability and sets ambitious ...

  8. Improving Compressed Air System Performance: A Sourcebook for Industry, Third Edition

    Office of Energy Efficiency and Renewable Energy (EERE)

    AMO's “Improving Compressed Air System Performance: A Sourcebook for Industry, Third Edition” has been recently revised introducing industry to compressed air systems, performance opportunities and...

  9. Update on Performance Improvement of Sandia-Built Li/(CFx)n and...

    Office of Scientific and Technical Information (OSTI)

    Update on Performance Improvement of Sandia-Built Li(CFx)n and LiFePO4 Cells. Citation Details In-Document Search Title: Update on Performance Improvement of Sandia-Built Li...

  10. Update on Performance Improvement of Sandia-Built Li/(CFx)n and...

    Office of Scientific and Technical Information (OSTI)

    Update on Performance Improvement of Sandia-Built Li(CFx)n and LiFePO4 Cells. Citation Details In-Document Search Title: Update on Performance Improvement of Sandia-Built Li(CFx)n ...

  11. EM Focuses on Contract, Project Management Improvements in Three-Day Workshop

    Broader source: Energy.gov [DOE]

    ORLANDO, Fla. – EM held a three-day workshop in Orlando this month focusing on strategies to improve contract and project management across the EM complex.

  12. Recent Improvements In Interface Management For Hanfords Waste...

    Office of Scientific and Technical Information (OSTI)

    Research Org: Hanford Site (HNF), Richland, WA (United States) Sponsoring Org: USDOE Office of Environmental Management (EM) (United States) Country of Publication: United States ...

  13. Improvement of the management of residual waste in areas without...

    Office of Scientific and Technical Information (OSTI)

    management scenarios for residual waste were compared by life cycle assessment (LCA). ... On the contrary the quality of the recyclables extracted can significantly modify the eco ...

  14. Nissan: Automaker improves energy performance 7.2% with a four-month payback using Superior Energy Performance

    Broader source: Energy.gov (indexed) [DOE]

    performance Case Study April 2016 Nissan Improves Energy Performance 24% over Six Years with SEP 1 Nissan's vehicle assembly plant in Smyrna, Tennessee, improved its energy performance by 24% over six years by participating in the U.S. Department of Energy's (DOE's) Superior Energy Performance® (SEP TM ) program. The plant first earned SEP certification at the Silver level in 2012 and was recertified to SEP at the Platinum level in 2015. Annual energy cost savings following Nissan's initial

  15. Performance parameters for managment of AAR-affected structures

    SciTech Connect (OSTI)

    Charlwood, R.G.

    1995-12-31

    The objective of the paper is to present a framework for the application of {open_quotes}Performance Parameters{close_quotes} for the long-term management of existing AAR-affected dams and hydroelectric plants as a basis for discussion in the workshop on dam safety issues. In this paper, references are made to various cases and the reader is referred to the companion paper for supporting information. The concept of {open_quotes}Performance Parameters{close_quotes} is being introduced by USBR as part of their dam safety program development. The focus is on dam safety related issues and parameter development starts with identification of failure modes of a dam, key performance parameters, and then progresses into definition of instrumentation and monitoring systems and potential action plans. Dam safety deficiencies and powerplant operational problems have been identified in several dams around the world and structural modifications either implemented or planned. In others, where slow (ASSR) or indefinitely continuing reactions (with {open_quotes}auto-generation{close_quotes} of alkalis) are occurring, it is necessary to plan a suitable monitoring and long management program which addresses the apparently {open_quotes}mild{close_quotes} degree of the problem but addresses the future potential in a realistic but not overly pessimistic manner. {open_quotes}Generic{close_quotes} performance parameters to address AAR effects based on a review of cases are proposed here as a possible guide to site specific development in actual cases. These are extended from the USBR scope in two respects: firstly, to include dam, spillway and plant operational issues, and secondly, into two levels of detail and effort. This discussion will be primarily a review of failure modes and key parameters. Techniques for forecasting and monitoring these parameters in an AAR environment are briefly reviewed.

  16. Improving Compressed Air System Performance: A Sourcebook for Industry

    SciTech Connect (OSTI)

    2003-11-01

    NREL will produce this sourcebook for DOE's Industrial Technologies Office as part of a series of documents on industrial energy equipment. The sourcebook is a reference for industrial compressed air system users, outlining opportunities to improve system efficiency.

  17. Free Flow Power Partners to Improve Hydrokinetic Turbine Performance...

    Energy Savers [EERE]

    to evaluate and optimize the technical and environmental performance and cost factors of its hydrokinetic SmarTurbines(tm)-turbines that generate energy from free-flowing rivers. ...

  18. Improvement of Urea SCR Performance Using Wiremesh Thermolysis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oxidation and Efficient Urea SCR NOx Reduction SCR Performance Optimization Through Advancements in Aftertreatment Packaging Urea Mixing Design -- Simulation and Test Investigation

  19. Integrated approach towards the application of horizontal wells to improve waterflooding performance. 1995 annual report

    SciTech Connect (OSTI)

    Kelkar, M.; Liner, C.; Kerr, D.

    1996-06-01

    This annual report describes the progress during the third year of the project on Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance. This project is funded under the Department of Energy`s Class I program which is targeted towards improving the reservoir performance of mature oil fields located in fluvially dominated deltaic geological environments. The project involves using an integrated approach to characterize the reservoir followed by proposing an appropriate reservoir management strategy to improve the field performance. In the first stage of the project, the type of data we integrated include cross borehole seismic surveys, geological interpretation based on the logs and the cores, and the engineering information. In contrast, during the second stage of the project, we intend to use only conventional data to construct the reservoir description. This report covers the results of the implementation from the first stage of the project. It also discusses the work accomplished so far for the second stage of the project. The preliminary results look promising from the field implementation. The production from the Self Unit (location of Stage I) has increased by 35 bbls/day with additional increase anticipated with further implementation. Based on our understanding of the first stage, we hope to examine a greater area of the Glenn Pool field for additional increase in production. We have collected available core and log data and have finished the initial geological description. Although not a direct part of this project, we also have initiated a 3-D seismic survey of the area which should help us in improving the reservoir description.

  20. EERE Success Story-Performance Improvements for Factory-Built...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    energy use in factory-built housing, as compared to best practice HUD-code construction. ... levels of energy performance: Best practice HUD-code; ENERGY STAR for Manufactured ...

  1. Annual Performance Evaluation Reports of the Alliance for Sustainable Energy for the Management & Operation of NREL

    Office of Energy Efficiency and Renewable Energy (EERE)

    Below are the Annual Performance Evaluation Reports of the Alliance for Sustainable Energy for the Management & Operation of NREL.

  2. PV Performance Modeling Collaborative's New and Improved Website Is

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Launched Modeling Collaborative's New and Improved Website Is Launched - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear

  3. NASA's Marshall Space Flight Center Improves Cooling System Performance

    SciTech Connect (OSTI)

    2011-02-22

    National Aeronautics and Space Administration’s (NASA) Marshall Space Flight Center (MSFC) has a longstanding sustainability program that revolves around energy and water efficiency as well as environmental protection. MSFC identified a problematic cooling loop with six separate compressor heat exchangers and a history of poor efficiency. The facility engineering team at MSFC partnered with Flozone Services, Incorporated to implement a comprehensive water treatment platform to improve the overall efficiency of the system.

  4. High Performance Healthcare Buildings: A Roadmap to Improved Energy Efficiency

    SciTech Connect (OSTI)

    Singer, Brett C.; Tschudi, William F.

    2009-09-08

    This document presents a road map for improving the energy efficiency of hospitals and other healthcare facilities. The report compiles input from a broad array of experts in healthcare facility design and operations. The initial section lists challenges and barriers to efficiency improvements in healthcare. Opportunities are organized around the following ten themes: understanding and benchmarking energy use; best practices and training; codes and standards; improved utilization of existing HVAC designs and technology; innovation in HVAC design and technology; electrical system design; lighting; medical equipment and process loads; economic and organizational issues; and the design of next generation sustainable hospitals. Achieving energy efficiency will require a broad set of activities including research, development, deployment, demonstration, training, etc., organized around 48 specific objectives. Specific activities are prioritized in consideration of potential impact, likelihood of near- or mid-term feasibility and anticipated cost-effectiveness. This document is intended to be broad in consideration though not exhaustive. Opportunities and needs are identified and described with the goal of focusing efforts and resources.

  5. An improved system for routine performance testing in fossil plants

    SciTech Connect (OSTI)

    Wolff, P.J.; Hansen, D.B.; March, P.A.

    1996-05-01

    A data acquisition and analysis system has been developed that reduces the time and labor required to perform routine performance tests on power plant components. The system uses modem data acquisition and computation technologies to integrate the process of data acquisition, data analysis, and reporting of results. During a test run, the data acquisition system reads the data and transfers it to a Microsoft Excel workbook via a dynamic data exchange (DDE) link. In Excel, the system computes and displays real-time trend plots. Real-time plots typically include a display of precision errors, thus providing an immediate indication of the quality of the current test. Upon completion of a run, the system saves results and creates plots in a workbook dedicated to test results. The plots can display computed values such as turbine or boiler feedpump efficiency. Benchmark data can also be included in the plots to provide immediate feedback concerning the change in the performance of a component and the dollar cost due to the performance change. The data tables and plots provide a preliminary report that is available immediately upon completion of the test.

  6. Recommendations to Improve Earned Value Management (EVM) and...

    Broader source: Energy.gov (indexed) [DOE]

    ... providing timely, accurate, reliable and actionable project and contractor cost, schedule, performance, risk, and forecast data, reports and information. The Federal project ...

  7. Shifting the Paradigm for Long Term Monitoring at Legacy Sites to Improve Performance while Reducing Cost

    SciTech Connect (OSTI)

    Eddy-Dilek, Carol A.; Looney, Brian B.; Seaman, John; Kmetz, Thomas

    2013-01-10

    A major issue facing many government and private industry sites that were previously contaminated with radioactive and chemical wastes is that often the sites cannot be cleaned up enough to permit unrestricted human access. These sites will require long-term management, in some cases indefinitely, leaving site owners with the challenge of protecting human health and environmental quality in a cost effective manner. Long-term monitoring of groundwater contamination is one of the largest projected costs in the life cycle of environmental management at the Savannah River Site (SRS), the larger DOE complex, and many large federal and private sites. Currently, most monitoring strategies are focused on laboratory measurements of contaminants measured in groundwater samples collected from wells. This approach is expensive, and provides limited and lagging information about the effectiveness of cleanup activities and the behavior of the residual contamination. Over the last twenty years, DOE and other federal agencies have made significant investments in the development of various types of sensors and strategies that would allow for remote analysis of contaminants in groundwater, but these approaches do not promise significant reductions in risk or cost. Scientists at SRS have developed a new paradigm to simultaneously improve the performance of long term monitoring systems while lowering the overall cost of monitoring. This alternative approach incorporates traditional point measurements of contaminant concentration with measurements of controlling variables including boundary conditions, master variables, and traditional plume/contaminant variables. Boundary conditions are the overall driving forces that control plume movement and therefore provide leading indication to changes in plume stability. These variables include metrics associated with meteorology, hydrology, hydrogeology, and land use. Master variables are the key variables that control the chemistry of the

  8. Integrated approach towards the application of horizontal wells to improve waterflooding performance. Quarterly report, April 1, 1997--June 30, 1997

    SciTech Connect (OSTI)

    Kelkar, M.; Liner, C.; Kerr, D.

    1997-10-01

    The overall purpose of the proposed project is to improve secondary recovery performance of a marginal oil field through the use of an appropriate reservoir management plan. The selection of plan will be based on the detailed reservoir description using an integrated approach. We expect that 2 to 5% of the original oil in place will be recovered using this method. This should extend the life of the reservoir by at least 10 years.

  9. Lithium Surface Coatings for Improved Plasma Performance in NSTX

    SciTech Connect (OSTI)

    Kugel, H W; Ahn, J -W; Allain, J P; Bell, R; Boedo, J; Bush, C; Gates, D; Gray, T; Kaye, S; Kaita, R; LeBlanc, B; Maingi, R; Majeski, R; Mansfield, D; Menard, J; Mueller, D; Ono, M; Paul, S; Raman, R; Roquemore, A L; Ross, P W; Sabbagh, S; Schneider, H; Skinner, C H; Soukhanovskii, V; Stevenson, T; Timberlake, J; Wampler, W R

    2008-02-19

    NSTX high-power divertor plasma experiments have shown, for the first time, significant and frequent benefits from lithium coatings applied to plasma facing components. Lithium pellet injection on NSTX introduced lithium pellets with masses 1 to 5 mg via He discharges. Lithium coatings have also been applied with an oven that directed a collimated stream of lithium vapor toward the graphite tiles of the lower center stack and divertor. Lithium depositions from a few mg to 1 g have been applied between discharges. Benefits from the lithium coating were sometimes, but not always seen. These improvements sometimes included decreases plasma density, inductive flux consumption, and ELM frequency, and increases in electron temperature, ion temperature, energy confinement and periods of MHD quiescence. In addition, reductions in lower divertor D, C, and O luminosity were measured.

  10. Raytheon: Compressed Air System Upgrade Saves Energy and Improves Performance

    SciTech Connect (OSTI)

    Not Available

    2005-04-01

    In 2003, Raytheon Company upgraded the efficiency of the compressed air system at its Integrated Air Defense Center in Andover, Massachusetts, to save energy and reduce costs. Worn compressors and dryers were replaced, a more sophisticated control strategy was installed, and an aggressive leak detection and repair effort was carried out. The total cost of these improvements was $342,000; however, National Grid, a utility service provider, contributed a $174,000 incentive payment. Total annual energy and maintenance cost savings are estimated at $141,500, and energy savings are nearly 1.6 million kWh. This case study was prepared for the U.S. Department of Energy's Industrial Technologies Program.