Sample records for management framework plan

  1. Enterprise Risk Management Framework

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Framework The Enterprise Risk Management (ERM) framework includes four steps: identify the risks, determine the probability and impact of each one, identify controls that are...

  2. PROJECT MANAGEMENT PLANS Project Management Plans

    Office of Environmental Management (EM)

    MANAGEMENT PLANS Project Management Plans Overview Project Management Plan Suggested Outline Subjects Crosswalk between the Suggested PMP Outline Subjects and a Listing ...

  3. Excess Uranium Inventory Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Excess Uranium Inventory Management Plan Excess Uranium Inventory Management Plan The 2013 Excess Uranium Inventory Management Plan describes a framework for the effective...

  4. Enterprise Risk Management Framework

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Framework The Enterprise Risk Management (ERM) framework includes four steps: identify the risks, determine the probability and impact of each one, identify controls that are already in place that mitigate that risk, and propose additional controls if needed. Step 1: Identify Risks - What can go wrong? This step should identify the negative outcomes that could result from an action or decision . It is important to consider a wide range of risks, and so the Department's ERM framework includes

  5. Excess Uranium Inventory Management Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The 2013 Excess Uranium Inventory Management Plan describes a framework for the effective management of the Energy Department’s surplus uranium inventory in support of meeting its critical...

  6. Sample Business Plan Framework 5

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 5: A program that establishes itself as a government entity, then operates using a fee-based structure.

  7. Sample Business Plan Framework 2

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 1: A program seeking to continue operations in the post-grant period as a not-for-profit (NGO) entity.

  8. Sample Business Plan Framework 4

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 4: A program seeking to continue in the post-grant period as a marketing contractor to a utility.

  9. Sample Business Plan Framework 3

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 3: A government entity running a Commercial PACE program in the post-grant period.

  10. Sample Business Plan Framework 1

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 1: A program seeking to continue operations in the post-grant period as a not-for-profit (NGO) entity.

  11. Digital Data Management Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy physics through experiments that strengthen our fundamental understanding of matter, energy, space, and time. Plans HAWC gamma-Ray Observatory Data Management Plan (pdf)...

  12. Energy Emergency Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-07-08

    To establish the administrative and operational framework of the Energy Emergency Management System (EEMS), and to establish the general criteria for the development and coordination of the Department's energy emergency planning activities. Cancels DOE 5500.8. Canceled by DOE O 151.1 of 9-25-95.

  13. Best Management Practice #1: Water Management Planning

    Office of Energy Efficiency and Renewable Energy (EERE)

    A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

  14. TWRS safety management plan

    SciTech Connect (OSTI)

    Popielarczyk, R.S., Westinghouse Hanford

    1996-08-01

    The Tank Waste Remediation System (TWRS) Safety Management Program Plan for development, implementation and maintenance of the tank farm authorization basis is described. The plan includes activities and procedures for: (a) Updating the current Interim Safety Basis, (b) Development,implementation and maintenance of a Basis for Interim Operations, (c) Development, implementation and maintenance of the Final Safety Analyses Report, (d) Development and implementation of a TWRS information Management System for monitoring the authorization basis.

  15. Sample Business Plan Framework 5 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Sample Business Plan Framework 5 U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 5: A program that establishes itself as a ...

  16. A Framework to Support the Fusion of Operation and Planning

    SciTech Connect (OSTI)

    Chen, Yousu; Etingov, Pavel V.; Fitzhenry, Erin B.; Sharma, Poorva; Nguyen, Tony B.; Makarov, Yuri V.; Rice, Mark J.; Allwardt, Craig H.; Widergren, Steven E.

    2015-12-31

    The management of the nation’s power system has progressed to the point where the boundary lines between operations and planning are becoming blurred. The dynamic behavior of smart grid technologies brings pressures of incorporating the predictive capability from planning to enhance operations. These needs are requiring a smoother, better integrated interplay between the functional roles of planning and operations. This paper presents a framework to support the fusion of operation and planning. A case study of predicting the intra-hour deficiency in generation capability and ramping capacity and presenting the outputs to operators was conducted. The study shows the benefits of the fusion and the effectiveness of the framework. All the function blocks used in the study were built upon GridOPTICS Software System (GOSS), a software system middleware platform that facilitates deployment of new applications for the future power grid.

  17. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Lab Plan - Other plans (SiteFacilities, WFD, etc) * Execute--perform technical & business functions - Management systems (CAS) * Check--measureanalyze & evaluate...

  18. Plutonium Vulnerability Management Plan

    SciTech Connect (OSTI)

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  19. Best Management Practice #1: Water Management Planning | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Water Management Planning Best Management Practice 1: Water Management Planning A successful water management program starts with a comprehensive strategic plan. The process ...

  20. Sample Business Plan Framework 1: A program seeking to continue...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sample Business Plan Framework 1: A program seeking to continue operations in the ... U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan ...

  1. Project Management Plan Examples | Department of Energy

    Office of Environmental Management (EM)

    Examples Project Management Plan Examples Examples From Project Management Plans The following material has been extracted from several project management plans. The order in which ...

  2. Environmental Management System Plan

    SciTech Connect (OSTI)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  3. Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  4. Project Management Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Project Management Plans (353.99 KB) More Documents & Publications Project Management Plan Examples Project Management Plan Examples 1 - 80 Deactivation Management

  5. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Process Maintain Lab Agenda Prepare ALP Program Execution Plan PEMP PreparationApproval POG Support CAS M-3 Implementation FNAL Enterprise Risk Management...

  6. EERE Digital Data Management Planning Requirements | Department...

    Broader source: Energy.gov (indexed) [DOE]

    To integrate data management planning into an overall research plan, the following ... All projects selected for EERE research funding must include a data management plan (DMP) ...

  7. TWRS Configuration management program plan

    SciTech Connect (OSTI)

    Vann, J.M.

    1996-06-03

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  8. Data Management Facility Operations Plan (Program Document) ...

    Office of Scientific and Technical Information (OSTI)

    Program Document: Data Management Facility Operations Plan Citation Details In-Document Search Title: Data Management Facility Operations Plan The Data Management Facility (DMF) is ...

  9. PROJECT MANGEMENT PLAN EXAMPLES Project Management Plan Examples

    Office of Environmental Management (EM)

    Management Plan Examples The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The elements table below ...

  10. Enterprise Risk Management (ERM) Framework for Directives

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-09-30

    Explains the new ERM framework for developing, revising, and reviewing directives. This memo directs the Office of Management to institutionalize ERM into the directives process no later than September 30, 2012.

  11. National Action Plan Vision for 2025: A Framework for Change

    SciTech Connect (OSTI)

    National Action Plan for Energy Efficiency

    2008-11-01

    Establishes a goal of achieving all cost-effective energy efficiency by 2025 and presents 10 implementation goals as a framework for advancing the National Action Plans key policy recommendations.

  12. A planning framework for transferring building energy technologies: Executive Summary

    SciTech Connect (OSTI)

    Farhar, B C; Brown, M A; Mohler, B L; Wilde, M; Abel, F H

    1990-08-01

    Accelerating the adoption of new and existing cost-effective technologies has significant potential to reduce the energy consumed in US buildings. This report summarizes some of the key results of an interlaboratory technology transfer planning effort in support of the US Department of Energy's Office of Building Technologies (the full report is published under SERI number TP-260-3729). A guiding assumption for planning was that OBT's R D program should forge linkages with existing programs whose goals involved enhancing energy efficiency in buildings. An ad hoc Technology Transfer Advisory Group reviewed the existing analysis and technology transfer program, brainstormed technology transfer approaches, interviewed DOE program managers, identified applicable research results, and developed a framework that management could use in deciding on the best investments of technology transfer resources. Representatives of 22 organizations were interviewed on their views of the potential for transferring energy efficiency technologies through active linking with OBT. The report describes in summary these programs and interview results; outlines OBT tools, technologies, and practices to be transferred; defines OBT audiences; identifies technology transfer functions and presents a framework devised using functions and audiences; presents some example technology transfer activities; and summarizes the Advisory Group's recommendations.

  13. Configuration Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Configuration Management Plan Configuration Management Plan This template is used for documenting the configuration management methodology, tools, techniques, roles and responsibilities and tasks for a systems development project. Configuration Management Plan (96.89 KB) More Documents & Publications SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Software Configuration Management Checklist NMMSS Software Quality Assurance Plan Software Configuration Management (SCM) A Practical Guide

  14. A modern solver framework to manage solution algorithms in the...

    Office of Scientific and Technical Information (OSTI)

    A modern solver framework to manage solution algorithms in the Community Earth System Model Citation Details In-Document Search Title: A modern solver framework to manage solution ...

  15. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Section 4.0 No significant changes. Comprehensive Legacy Management and Institutional Controls Plan, Revision 9, Draft Volume I, Legacy Management Plan Significant Changes Summary ...

  16. California Groundwater Management Plans | Open Energy Information

    Open Energy Info (EERE)

    Groundwater Management Plans Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: California Groundwater Management PlansLegal Published...

  17. LFRG Program Management Plan (LFRG PMP)

    Office of Environmental Management (EM)

    LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN SEPTEMBER 18, 2000 LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN Jay ...

  18. ARM - Data Management and Documentation Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DocumentationData Management and Documentation Plan Policies, Plans, Descriptions Data Documentation Home Data Sharing and Distribution Policy Data Management and Documentation ...

  19. AVLIS production plant waste management plan

    SciTech Connect (OSTI)

    Not Available

    1984-11-15

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables.

  20. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    II Environmental Management Headquarters Corrective Action Plan - Radiological Release ... actions for addressing Office of Environmental Management (EM) Headquarters (HQ) ...

  1. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. .........32 Comprehensive Legacy Management and Institutional Controls ...

  2. Configuration management plan for LABCORE Program

    SciTech Connect (OSTI)

    Rich, H.S.

    1995-01-03

    A hardware/software configuration management plan for LABCORE. LABCORE is a laboratory information management system used by Analytical Services.

  3. Waste shipment engineering data management plan

    SciTech Connect (OSTI)

    Marquez, D.L.

    1995-05-01

    This plan documents current data management practices and future data management improvements for TWRS Waste Shipment Engineering.

  4. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. .........49 Comprehensive Legacy Management and Institutional Controls ...

  5. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. .........52 Comprehensive Legacy Management and Institutional Controls ...

  6. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. .........34 Comprehensive Legacy Management and Institutional Controls ...

  7. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. .........33 Comprehensive Legacy Management and Institutional Controls ...

  8. Underground storage tank management plan

    SciTech Connect (OSTI)

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  9. Excess Uranium Inventory Management Plan 2008 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan 2008 Excess Uranium Inventory Management Plan 2008 On March 11, 2008, Secretary of Energy Samuel W. Bodman signed a policy statement1 on the management of the U.S. Department of Energy's (DOE) excess uranium inventory (Policy Statement). This Policy Statement provides the framework within which DOE will make decisions concerning future use and disposition of this inventory. The Policy Statement commits DOE to manage those inventories in a manner that: (1) is consistent with all applicable

  10. A reservoir management plan

    SciTech Connect (OSTI)

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  11. Solid Waste Management Program Plan

    SciTech Connect (OSTI)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  12. Waste Management Quality Assurance Plan

    SciTech Connect (OSTI)

    Not Available

    1993-11-30

    Lawrence Berkeley Laboratory`s Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department`s activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A.

  13. LFRG Program Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Plan LFRG Program Management Plan The purpose of the EM Low-Level Waste Disposal Facility Federal Review Group Program Management Plan (LFRG PMP) is to establish the LFRG roles and responsibilities, the LFRG management processes, and the transition from DOE Order 5820.2A to DOE Order 435.1. LFRG Program Management Plan (LFRG PMP) (185.11 KB) More Documents & Publications LFRG Execution Plan Low-Level Waste Disposal Facility Federal Review Group Manual LFRG Charter

  14. Enterprise Risk Management Framework - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Framework by Website Administrator PDF document icon Enterprise_Risk_Managment_Framework.pdf - PDF document, 359 KB (368207

  15. Data Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data Management Plan Data Management Plan A data management plan explains how data generated in the course of the work performed under an EERE award will be shared and preserved or, when justified, explains why data sharing or preservation is not possible or scientifically appropriate. No specific template, but follow the guidelines in this file. Data Management Plan (53.62 KB) More Documents & Publications DOE Public Access Plan RE: NBP RFI: Data Access In the Matter of Implementing the

  16. Developing a Water Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facilities Water Efficiency Developing a Water Management Plan Developing a Water Management Plan Developing a Water Management Plan A successful water management program ...

  17. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. ... Appendix A Contact List Comprehensive Legacy Management and Institutional Controls ...

  18. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Preserve, Fernald, Ohio Comprehensive Legacy Management and Institutional Controls Plan ... blank LMSFERS03496-9.0 Comprehensive Legacy Management and Institutional Controls ...

  19. Planning for an Energy Management System

    Broader source: Energy.gov [DOE]

    This presentation discusses the Planning step as part of an Energy Management System. Planning involves establishing your energy picture, defining the scope and boundary, setting an energy baseline, and developing action plans.

  20. Intellectual Property Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intellectual Property Management Plan Intellectual Property Management Plan The following guidance is provided to assist applicants in preparing and executing an intellectual property (IP) management plan. This guidance is not exclusive and should not be considered an exhaustive or comprehensive listing of acceptable approaches. Each applicant is encouraged to use its own discretion to independently develop and submit an IP management plan that it and its team (or consortium) believe will best

  1. Solid Waste Management Plan. Revision 4

    SciTech Connect (OSTI)

    1995-04-26

    The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

  2. Department of Energy Asset Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Asset Management Plan Department of Energy Asset Management Plan The Department of Energy Asset Management Plan (2015) provides an integrating strategy for ...

  3. 2016-2020 Strategic Plan and Implementing Framework

    SciTech Connect (OSTI)

    2015-11-01

    The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation’s leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy.

  4. ICDF Complex Operations Waste Management Plan

    SciTech Connect (OSTI)

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  5. Overview of the Hanford risk management plan

    SciTech Connect (OSTI)

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  6. MA - Office of Management - Energy Conservation Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MA Energy Conservation Plan January 2010 1 Office of Management Office-Level Energy Conservation Plan January 2010 I. BACKGROUND This energy conservation plan represents an effort to reduce energy consumption within Office of Management (MA) office spaces and to increase employee awareness of and participation in energy conservation measures. II. SCOPE The plan and procedures in this document apply to all Office of Management (MA) office suites in the Forrestal and Germantown Facilities as well

  7. Environmental Management and Planning Solutions, Inc | Open Energy...

    Open Energy Info (EERE)

    Environmental Management and Planning Solutions, Inc Jump to: navigation, search Name: Environmental Management and Planning Solutions, Inc Abbreviation: EMPSi Website:...

  8. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  9. Oak Ridge Reservation Waste Management Plan

    SciTech Connect (OSTI)

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  10. Spent Nuclear Fuel project, project management plan

    SciTech Connect (OSTI)

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  11. Spent Nuclear Fuel Project Safety Management Plan

    SciTech Connect (OSTI)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities.

  12. FY 2015 - Stockpile Stewardship and Management Plan

    SciTech Connect (OSTI)

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  13. FY 2016 - Stockpile Stewardship and Management Plan

    SciTech Connect (OSTI)

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  14. Paducah Site Management Plan | Department of Energy

    Energy Savers [EERE]

    Management Plan Paducah Site Management Plan The annual Paducah Gaseous Diffusion Plant Site Management Plan (SMP) outlines DOE's strategic approach for achieving cleanup under the Federal Facility Agreement. The purpose of the SMP is to coordinate and document the potential and selected operable units, including removal actions; to define cleanup priorities; to identify work activities that will serve as the basis for enforceable timetables and deadlines under the agreement; and to establish

  15. Tank waste remediation system configuration management plan

    SciTech Connect (OSTI)

    Vann, J.M.

    1998-01-08

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.

  16. Legacy Management 2011-2020 Strategic Plan

    Broader source: Energy.gov [DOE]

    At the August 13, 2014 Committee meeting Tom Longo DOE, Provided Information on DOEs Long Term Stewardship Plan and Office of Legacy Management.

  17. Total quality management program planning

    SciTech Connect (OSTI)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  18. 2011-2015 Human Capital Management Plan

    Broader source: Energy.gov [DOE]

    The Office of Legacy Management (LM) needs skilled and engaged staff to accomplish our mission and carry out our responsibilities to the American people. This Human Capital Management Plan (HCMP or...

  19. Glenwood Springs Resource Management Plan (1984) | Open Energy...

    Open Energy Info (EERE)

    Resource Management Plan (1984) Jump to: navigation, search OpenEI Reference LibraryAdd to library Land Use Plan: Glenwood Springs Resource Management Plan (1984) Organization BLM...

  20. DOE-ORP Contract Management Plans - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan (Rev. 7 September 19, 2014) (PDF) Tank Operations Contract Management Plan TOC Contract Management Plan (October 27, 2008) (PDF) TOC CMP Attachment A Section B...

  1. Additional Guidance for EERE Digital Data Management Plans |...

    Office of Environmental Management (EM)

    Services Funding Digital Data Management Additional Guidance for EERE Digital Data Management Plans Additional Guidance for EERE Digital Data Management Plans Beyond the ...

  2. Suggested Elements for an EERE Data Management Plan | Department...

    Office of Environmental Management (EM)

    Services Funding Digital Data Management Suggested Elements for an EERE Data Management Plan Suggested Elements for an EERE Data Management Plan The principal investigator ...

  3. Suggested Elements for a Data Management Plan | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Funding Digital Data Management Suggested Elements for a Data Management Plan Suggested Elements for a Data Management Plan The principal investigator should ...

  4. Environmental Restoration Information Resource Management Program Plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  5. Corrective Action Plan for Environmenta' Management Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corrective Action Plan for Environmenta' Management Headquarters Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant on February 14~ 2014 Washington, DC 20585 August 2015 Corrective Action Plan for Environmental Management Headquarters Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014 Deputy Assistant Secretary for Safety, Security, and Quality Programs Environmental Management Approved by: Monica Regalbuto Assistant Secretary for

  6. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect (OSTI)

    Field, S. M.

    2007-04-01

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  7. Project Management Plan Examples 1- 80

    Office of Energy Efficiency and Renewable Energy (EERE)

    The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The descriptions below should be used to navigate to the subject of...

  8. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    Establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Cancels: DOE N 473.9 and DOE M 470.1-1

  9. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    The manual establishes program planning and management requirements for the Departments Safeguards and Security. Chg 1, dated 3-7-06 Cancels DOE N 473.9, DOE M 470.1-1 Chg 2.

  10. Environmental Management Headquarters Corrective Action Plan - Radiological

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Release Phase II | Department of Energy II Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase II The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant (WIPP) on February 14, 2014. The report identified

  11. EERE Digital Data Management Planning Requirements

    Broader source: Energy.gov [DOE]

    To integrate data management planning into an overall research plan, here are requirements which apply to all EERE research solicitations and invitations for new, renewal, and some supplemental funding issued on or after Oct. 1, 2014. These requirements apply to proposals from all organizations, including academic institutions, DOE national laboratories, and others.

  12. Draft of the PHENIX Management Plan

    SciTech Connect (OSTI)

    Not Available

    1994-03-10

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

  13. WAP Memorandum 010: Quality Management Plan - Record Keeping...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10: Quality Management Plan - Record Keeping and Reporting WAP Memorandum 010: Quality Management Plan - Record Keeping and Reporting Effective: April 8, 2015 10 CFR 440.24 ...

  14. Acquisition Planning--Extending A Management and Operating Contract...

    Energy Savers [EERE]

    Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Acquisition Planning--Extending A Management and Operating Contract Without ...

  15. Environmental Management and Planning Solutions, Inc | Open Energy...

    Open Energy Info (EERE)

    Environmental Management and Planning Solutions, Inc (Redirected from EMPSi) Jump to: navigation, search Name: Environmental Management and Planning Solutions, Inc Abbreviation:...

  16. India-Natural Resource Management Plan | Open Energy Information

    Open Energy Info (EERE)

    Natural Resource Management Plan Jump to: navigation, search Name India-Natural Resource Management Plan AgencyCompany Organization Government of India Sector Land Focus Area...

  17. EERE Digital Data Management Planning Roles and Responsibilities...

    Broader source: Energy.gov (indexed) [DOE]

    and Renewable Energy (EERE) data management plans (DMPs) are outlined below. EERE Beginning Oct. 1, 2015, EERE will ensure that the requirements for data management plans are ...

  18. Spent Nuclear Fuel Project Document Management Plan

    SciTech Connect (OSTI)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed.

  19. Asset Management Plan | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Asset Management Plan NNSA's Asset Management Program Completes First Pilot The National Nuclear Security Administration (NNSA) today announced completion of a $520k pilot to replace a roof, as well as heating, ventilation and cooling (HVAC) system for the Core Library and Data Center at Mercury, Nevada (http://nevada.usgs.gov/mercury/). The library was established

  20. Emergency Management: Facility Emergency Plan Template

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Building 219, 274 and 278 SSRL Building Facility Emergency Plan In Case of Emergency 9-911 from a SLAC phone 911 from a non-SLAC phone Then notify SLAC Site Security, Ext. 5555 SLAC Emergency Resources SLAC Site Security 5555 On-site Palo Alto Fire Station Number 7 2776 Conventional and Experimental Facilities 8901 Normal working hours only SLAC Medical Department 2281 Waste Management 2399 Building manager Larry Cadapan Assistant building manager Brian Choi Publication date

  1. Jefferson Lab Project Management & Integrated Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LERF Contact Our Staff Directorate Project Control System Manual Technical Engineering Development Facility (TEDF) Utilities Infrastructure Modernization (UIM) Office of Project Management Org Chart Project Management Office Vision: Partnering with our customers, we provide support to further the laboratory's mission to operate a world class user facility for conducting nuclear physics research. Our focus is to provide project management and integrated planning support across the Lab that is

  2. 2013 Annual Planning Summary for the Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management Consolidated Business Center 2013 Annual Planning Summary for the Environmental Management Consolidated Business Center The ongoing and projected...

  3. Acquisition Planning--Extending A Management and Operating Contract Without

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Full and Open Competition; and Site and Utilization Management Planning | Department of Energy Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning PF2009-13.pdf (337.25 KB) PF2009-13a - Acquisition Letter 2009-03 - Acquisition Planning (130.37 KB) More Documents

  4. CRAD, Configuration Management Assessment Plan

    Broader source: Energy.gov [DOE]

    The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders.

  5. National Ignition Facility Configuration Management Plan

    SciTech Connect (OSTI)

    Cabral, S G; Moore, T L

    2002-10-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  6. Hanford cultural resources management plan

    SciTech Connect (OSTI)

    Chatters, J.C.

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  7. Data Management Facility Operations Plan

    SciTech Connect (OSTI)

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  8. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect (OSTI)

    Not Available

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  9. Emergency Management: Facility Emergency Plan Template

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    20, 130 ,131 Other SLAC Resources SLAC Site Security Main Gate 2551 On-site Palo Alto Fire Station Business Phone 2776 Facilities Department Service Request 8901 Normal working hours only SLAC Medical Department 2281 Waste Management 2399 Building manager Brian Choi Assistant building manager Larry Cadapan Publication dates September 24, 2010 Prepared by Behzad Bozorg-Chami Approved by 20 Jun 2007 (updated AUG. 2010) SLAC-I-730-0A14J-001-R001 2 of 12 Emergency Management: Facility Emergency Plan

  10. The Department of Energy Asset Management Plan (2015) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy The Department of Energy Asset Management Plan (2015) The Department of Energy Asset Management Plan (2015) Asset Management Plan_Final_w S-2 distro memo_2015.05.26.pdf (10.66 MB) More Documents & Publications Department of Energy Asset Management Plan cover_booked.indd Three-year Rolling Timeline

  11. Bureau of Land Management - Land Use Planning | Open Energy Informatio...

    Open Energy Info (EERE)

    Planning Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - Land Use Planning Abstract The BLM's Resource Management Plans...

  12. Hanford site integrated pest management plan

    SciTech Connect (OSTI)

    Giddings, R.F.

    1996-04-09

    The Hanford Site Integrated Pest Management Plan (HSIPMP) defines the Integrated Pest Management (IPM) decision process and subsequent strategies by which pest problems are to be solved at all Hanford Site properties per DOE-RL Site Infrastructure Division memo (WHC 9505090). The HSIPMP defines the roles that contractor organizations play in supporting the IPM process. In short the IPM process anticipates and prevents pest activity and infestation by combining several strategies to achieve long-term pest control solutions.

  13. Re-engineering the Federal planning process: A total Federal planning strategy, integrating NEPA with modern management tools

    SciTech Connect (OSTI)

    Eccleston, C.H.

    1997-09-05

    The National Environmental Policy Act (NEPA) of 1969 was established by Congress more than a quarter of a century ago, yet there is a surprising lack of specific tools, techniques, and methodologies for effectively implementing these regulatory requirements. Lack of professionally accepted techniques is a principal factor responsible for many inefficiencies. Often, decision makers do not fully appreciate or capitalize on the true potential which NEPA provides as a platform for planning future actions. New approaches and modem management tools must be adopted to fully achieve NEPA`s mandate. A new strategy, referred to as Total Federal Planning, is proposed for unifying large-scale federal planning efforts under a single, systematic, structured, and holistic process. Under this approach, the NEPA planning process provides a unifying framework for integrating all early environmental and nonenvironmental decision-making factors into a single comprehensive planning process. To promote effectiveness and efficiency, modem tools and principles from the disciplines of Value Engineering, Systems Engineering, and Total Quality Management are incorporated. Properly integrated and implemented, these planning tools provide the rigorous, structured, and disciplined framework essential in achieving effective planning. Ultimately, the goal of a Total Federal Planning strategy is to construct a unified and interdisciplinary framework that substantially improves decision-making, while reducing the time, cost, redundancy, and effort necessary to comply with environmental and other planning requirements. At a time when Congress is striving to re-engineer the governmental framework, apparatus, and process, a Total Federal Planning philosophy offers a systematic approach for uniting the disjointed and often convoluted planning process currently used by most federal agencies. Potentially this approach has widespread implications in the way federal planning is approached.

  14. Marine and Hydrokinetic Technology Development Risk Management Framework

    SciTech Connect (OSTI)

    Snowberg, David; Weber, Jochem

    2015-09-01

    Over the past decade, the global marine and hydrokinetic (MHK) industry has suffered a number of serious technological and commercial setbacks. To help reduce the risks of industry failures and advance the development of new technologies, the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) developed an MHK Risk Management Framework. By addressing uncertainties, the MHK Risk Management Framework increases the likelihood of successful development of an MHK technology. It covers projects of any technical readiness level (TRL) or technical performance level (TPL) and all risk types (e.g. technological risk, regulatory risk, commercial risk) over the development cycle. This framework is intended for the development and deployment of a single MHK technology—not for multiple device deployments within a plant. This risk framework is intended to meet DOE’s risk management expectations for the MHK technology research and development efforts of the Water Power Program (see Appendix A). It also provides an overview of other relevant risk management tools and documentation.1 This framework emphasizes design and risk reviews as formal gates to ensure risks are managed throughout the technology development cycle. Section 1 presents the recommended technology development cycle, Sections 2 and 3 present tools to assess the TRL and TPL of the project, respectively. Section 4 presents a risk management process with design and risk reviews for actively managing risk within the project, and Section 5 presents a detailed description of a risk registry to collect the risk management information into one living document. Section 6 presents recommendations for collecting and using lessons learned throughout the development process.

  15. Evaluation of a performance appraisal framework for radiation therapists in planning and simulation

    SciTech Connect (OSTI)

    Becker, Jillian; Bridge, Pete; Brown, Elizabeth; Lusk, Ryan; Ferrari-Anderson, Janet

    2015-06-15

    Constantly evolving technology and techniques within radiation therapy require practitioners to maintain a continuous approach to professional development and training. Systems of performance appraisal and adoption of regular feedback mechanisms are vital to support this development yet frequently lack structure and rely on informal peer support. A Radiation Therapy Performance Appraisal Framework (RT-PAF) for radiation therapists in planning and simulation was developed to define expectations of practice and promote a supportive and objective culture of performance and skills appraisal. Evaluation of the framework was conducted via an anonymous online survey tool. Nine peer reviewers and fourteen recipients provided feedback on its effectiveness and the challenges and limitations of the approach. Findings from the evaluation were positive and suggested that both groups gained benefit from and expressed a strong interest in embedding the approach more routinely. Respondents identified common challenges related to the limited ability to implement suggested development strategies; this was strongly associated with time and rostering issues. This framework successfully defined expectations for practice and provided a fair and objective feedback process that focussed on skills development. It empowered staff to maintain their skills and reach their professional potential. Management support, particularly in regard to provision of protected time was highlighted as critical to the framework's ongoing success. The demonstrated benefits arising in terms of staff satisfaction and development highlight the importance of this commitment to the modern radiation therapy workforce.

  16. Project Hanford management contract quality improvement project management plan

    SciTech Connect (OSTI)

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  17. Hanford emergency management plan - release 15

    SciTech Connect (OSTI)

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  18. Ocean Thermal Energy Conversion Program Management Plan

    SciTech Connect (OSTI)

    Combs, R E

    1980-01-01

    The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

  19. Nevada Test Site Resource Management Plan

    SciTech Connect (OSTI)

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  20. Stockpile Stewardship and Management Plan | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Mission / Managing the Stockpile Stockpile Stewardship and Management Plan This Department of Energy's (DOE) National Nuclear Security Administration (NNSA) Fiscal Year 2017 Stockpile Stewardship and Management Plan (SSMP) - Biennial Plan Summary (FY 2017 SSMP) is a key planning document for the nuclear security enterprise. This year's summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of

  1. DOCS System Configuration Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOCS System Configuration Management Plan DOCS System Configuration Management Plan The DOCS Systems Configuration Management Plan (SCMP), from an actual DOE systems engineering project, can be used as a template to facilitate the creation of the CMP for your particular project. DOCS System Configuration Management Plan (654.98 KB) More Documents & Publications OPC Security Whitepaper #3Hardening Guidelines for OPC Hosts NMMSS Software Quality Assurance Plan ABB SCADA/EMS System INEEL

  2. AVLIS Production Plant Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  3. Environmental Management Los Alamos Field Corrective Action Plan...

    Energy Savers [EERE]

    Los Alamos Field Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Corrective Action Plan - Radiological Release Phase II On March...

  4. Mission Plan for the Civilian Radioactive Waste Management Program...

    Broader source: Energy.gov (indexed) [DOE]

    this Mission Plan for the Civilian Radioactive Waste Management Program. The Mission Plan is divided into two parts. Part I describes the overall goals, objectives, and...

  5. Department of Energy Asset Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Asset Management Plan Department of Energy Asset Management Plan The Department of Energy Asset Management Plan (2015) provides an integrating strategy for supporting the management and performance goals in the Department's Strategic Plan; fulfilling Federal requirements governing the acquisition, management, and disposal of property; and conducting activities in a manner that provides the best value for the American taxpayers. The guiding principles ensure the Department's portfolio of real and

  6. Nitrate contamination of groundwater: A conceptual management framework

    SciTech Connect (OSTI)

    Almasri, Mohammad N. . E-mail: mnmasri@najah.edu

    2007-04-15

    In many countries, public concern over the deterioration of groundwater quality from nitrate contamination has grown significantly in recent years. This concern has focused increasingly on anthropogenic sources as the potential cause of the problem. Evidence indicates that the nitrate (NO{sub 3}) levels routinely exceed the maximum contaminant level (MCL) of 10 mg/l NO{sub 3}-N in many aquifer systems that underlie agriculture-dominated watersheds. Degradation of groundwater quality due to nitrate pollution along with the increasing demand for potable water has motivated the adoption of restoration actions of the contaminated aquifers. Restoration efforts have intensified the dire need for developing protection alternatives and management options such that the ultimate nitrate concentrations at the critical receptors are below the MCL. This paper presents a general conceptual framework for the management of groundwater contamination from nitrate. The management framework utilizes models of nitrate fate and transport in the unsaturated and saturated zones to simulate nitrate concentration at the critical receptors. To study the impact of different management options considering both environmental and economic aspects, the proposed framework incorporates a component of a multi-criteria decision analysis. To enhance spatiality in model development along with the management options, the utilization of a land use map is depicted for the allocation and computation of on-ground nitrogen loadings from the different sources.

  7. A framework for the assessment of severe accident management strategies

    SciTech Connect (OSTI)

    Kastenberg, W.E.; Apostolakis, G.; Dhir, V.K.

    1993-09-01

    Severe accident management can be defined as the use of existing and/or altemative resources, systems and actors to prevent or mitigate a core-melt accident. For each accident sequence and each combination of severe accident management strategies, there may be several options available to the operator, and each involves phenomenological and operational considerations regarding uncertainty. Operational uncertainties include operator, system and instrumentation behavior during an accident. A framework based on decision trees and influence diagrams has been developed which incorporates such criteria as feasibility, effectiveness, and adverse effects, for evaluating potential severe accident management strategies. The framework is also capable of propagating both data and model uncertainty. It is applied to several potential strategies including PWR cavity flooding, BWR drywell flooding, PWR depressurization and PWR feed and bleed.

  8. Tank Waste Remediation Systems (TWRS) Configuration Management Implementation Plan

    SciTech Connect (OSTI)

    WEIR, W.R.

    2000-12-18

    The Tank Waste Configuration Management (TWRS) Configuration Management Implementation Plan descibes the execution of the configuration management (CM) that the contractor uses to manage and integrate its programmatic and functional operations to perform work.

  9. ARM Climate Research Facility Management Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Atmospheric Radiation Measurement (ARM) Climate Research Facility Management Plan Revised April 2016 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use

  10. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  11. 2011 Annual Planning Summary for Office of Legacy Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary for Legacy Management (LM) 2013 Annual Planning Summary for the Office of Legacy Management 2012 Independent Communication and Outreach Stakeholder Satisfaction Survey

  12. 2012 Annual Planning Summary for Environmental Management | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management 2012 Annual Planning Summary for Environmental Management The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 ...

  13. Waste Management Committee Fiscal Year 2012 Work Plan | Department...

    Office of Environmental Management (EM)

    Management Committee Fiscal Year 2012 Work Plan Waste Management Committee Fiscal Year 2012 Work Plan Topics: TA-21 TA-54 RiskBenefit Principles Consent Order PDF icon WM-FY12-WP...

  14. ADEQ Nonpoint Source State Management Plan | Open Energy Information

    Open Energy Info (EERE)

    Nonpoint Source State Management Plan Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: ADEQ Nonpoint Source State Management PlanLegal...

  15. Mixed Waste Focus Area program management plan

    SciTech Connect (OSTI)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

  16. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    The manual establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Change 2 is a revision to Section M of both the Manual and the CRD to realign the process for establishing deviations from DOE directives containing safeguards and security requirements to reflect established Departmental policy as set forth in DOE O 251.1C. Original publication, 8-26-05; Chg 1, 3-7-06. Canceled by DOE O 470.4B

  17. SUSTAINABILITY NEWS DOE Publishes its Strategic Water Management Plan

    Energy Savers [EERE]

    DOE Publishes its Strategic Water Management Plan The Sustainability Performance Office (SPO) announces the release of its Strategic Water Management Plan in conjunction with the Pacific Northwest National Laboratory (PNNL). The plan analyzes water use across the agency so that water management initiatives can be prioritized, thereby increasing DOEs water security and sustainability. Strategies are presented to help target best practices and alternative water projects. To access to the plan,

  18. Arid Lands Ecology Facility management plan

    SciTech Connect (OSTI)

    None

    1993-02-01

    The Arid Lands Ecology (ALE) facility is a 312-sq-km tract of land that lies on the western side of the Hanford Site in southcentral Washington. The US Atomic Energy Commission officially set aside this land area in 1967 to preserve shrub-steppe habitat and vegetation. The ALE facility is managed by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) for ecological research and education purposes. In 1971, the ALE facility was designated the Rattlesnake Hills Research Natural Area (RNA) as a result of an interagency federal cooperative agreement, and remains the largest RNA in Washington. it is also one of the few remaining large tracts of shrub-steppe vegetation in the state retaining a predominant preeuropean settlement character. This management plan provides policy and implementation methods for management of the ALE facilities consistent with both US Department of Energy Headquarters and the Richland Field Office decision (US Congress 1977) to designate and manage ALE lands as an RNA and as a component of the DOE National Environmental Research Park System.

  19. HotSpot Software Configuration Management Plan

    SciTech Connect (OSTI)

    Walker, H; Homann, S G

    2009-03-12

    This Software Configuration Management Plan (SCMP) describes the software configuration management procedures used to ensure that the HotSpot dispersion model meets the requirements of its user base, which includes: (1) Users of the PC version of HotSpot for consequence assessment, hazard assessment and safety analysis calculations; and (2) Users of the NARAC Web and iClient software tools, which allow users to run HotSpot for consequence assessment modeling These users and sponsors of the HotSpot software and the organizations they represent constitute the intended audience for this document. This plan is intended to meet Critical Recommendations 1 and 3 from the Software Evaluation of HotSpot and DOE Safety Software Toolbox Recommendation for inclusion of HotSpot in the Department of Energy (DOE) Safety Software Toolbox. HotSpot software is maintained for the Department of Energy Office of Emergency Operations by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL). An overview of HotSpot and NARAC are provided.

  20. Issue framework for potential 100-N advice (lead Issue Manager: Engstrom

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    framework for potential 100-N advice (lead Issue Manager: Engstrom) Background information The 100-N area is the last of the 100 Area, River Corridor, RI/FS and Proposed Plans for submittal. The 100-N area consists of two Decision Units, NR-1, which is the source unit, and NR-2, the groundwater unit. There are 234 facilities, of which 76% have been demolished, and there are 175 waste sites and four RCRA TSD sites. Of these waste sites, 18 have been cleaned up and 78 have been scheduled for start

  1. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect (OSTI)

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  2. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect (OSTI)

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  3. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect (OSTI)

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  4. Waste Management Committee Fiscal Year 2015 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 5 Work Plan Waste Management Committee Fiscal Year 2015 Work Plan Topics: TA-54 Consent Order Deliverables FY'17 Budget National Waste Forum WM-FY15-WP - November 17, 2014 (255.83

  5. FY 2014 - Stockpile and Stewardship and Management Plan

    SciTech Connect (OSTI)

    2013-06-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  6. Waste Management Committee Fiscal Year 2014 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Work Plan Waste Management Committee Fiscal Year 2014 Work Plan Topics: TA-54 Consent Order TA-49 Remediation TA-21 Remediation Material Disposal Areas WM-FY14-WP - September 25, ...

  7. Waste Management Committee Fiscal Year 2013 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Work Plan Waste Management Committee Fiscal Year 2013 Work Plan Topics: TA-21 TA-54 RiskBenefit Principles TA-49 Fiscal Year 2012 Budget WM-FY13-WP - September 26, 2012 (13.32

  8. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    SciTech Connect (OSTI)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list.

  9. WAP Memorandum 010: Quality Management Plan - Record Keeping and Reporting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy 10: Quality Management Plan - Record Keeping and Reporting WAP Memorandum 010: Quality Management Plan - Record Keeping and Reporting Effective: April 8, 2015 10 CFR 440.24 requires Grantees and Subgrantees administering the Weatherization Assistance Program (WAP) keep records as the Department of Energy (DOE) shall require. WAP Memorandum 15-10 Quality Management Plan addresses record keeping and reporting. The attached draft Client File Checklist identifies elements

  10. Hanford Sampling Quality Management Plan (HSQMP)

    SciTech Connect (OSTI)

    Hyatt, J.E.

    1995-04-28

    This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user`s guide to the Data Quality Objective process, and a self-assessment checklist.

  11. Technical Assistance Contractor management plan. Revision 1

    SciTech Connect (OSTI)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  12. Suggested Elements for an EERE Data Management Plan

    Broader source: Energy.gov [DOE]

    This page lists the suggested elements of an EERE data management plan including data types and sources, content and format, sharing and preservation, protection and rationale.

  13. Microsoft Word - ContractManagementPlanningDRIVERS.doc | Department...

    Broader source: Energy.gov (indexed) [DOE]

    ContractManagementPlanningDRIVERS.doc More Documents & Publications Microsoft Word - ARRAAttachment2.doc Microsoft Word - ARRAModelWAS.doc Microsoft Word - ARRAMOModelMod.doc...

  14. Spent Nuclear Fuel project integrated safety management plan

    SciTech Connect (OSTI)

    Daschke, K.D.

    1996-09-17

    This document is being revised in its entirety and the document title is being revised to ``Spent Nuclear Fuel Project Integrated Safety Management Plan.

  15. BLM - Approved Resource Management Plan Amendments/Record of...

    Open Energy Info (EERE)

    BLM - Approved Resource Management Plan AmendmentsRecord of Decision for Solar Energy Development in Six Southwestern States Jump to: navigation, search OpenEI Reference...

  16. Internal Audit Management of Corrective Action Plans | The Ames...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Internal Audit Management of Corrective Action Plans Version Number: 1.0 Document Number: Procedure 10300.001 Effective Date: 01...

  17. Bureau of Land Management - Land Use Planning Handbook | Open...

    Open Energy Info (EERE)

    to library PermittingRegulatory Guidance - GuideHandbook: Bureau of Land Management - Land Use Planning HandbookPermittingRegulatory GuidanceGuideHandbook Abstract...

  18. Oregon Guidelines for Stormwater Management Plans for Removal...

    Open Energy Info (EERE)

    Guidelines for Stormwater Management Plans for RemovalFill Permit Applications Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  19. Utah Nonpoint Source Pollution Management Plan | Open Energy...

    Open Energy Info (EERE)

    Nonpoint Source Pollution Management Plan Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Utah Nonpoint Source...

  20. Internal Audit Management of Corrective Action Plans | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Internal Audit Management of Corrective Action Plans Version Number: 1.0 Document Number: Procedure 10300.001 Effective Date: 01

  1. Sustainability principles in strategic environmental assessment: A framework for analysis and examples from Italian urban planning

    SciTech Connect (OSTI)

    Lamorgese, Lydia Geneletti, Davide

    2013-09-15

    This paper presents a framework for analysing the degree of consideration of sustainability principles in Strategic environmental assessment (SEA), and demonstrates its application to a sample of SEA of Italian urban plans. The framework is based on Gibson's (2006) sustainability principles, which are linked to a number of guidance criteria and eventually to review questions, resulting from an extensive literature review. A total of 71 questions are included in the framework, which gives particular emphasis to key concepts, such as intragenerational and intergenerational equity. The framework was applied to review the Environmental Report of the urban plans of 15 major Italian cities. The results of this review show that, even if sustainability is commonly considered as a pivotal concept, there is still work to be done in order to effectively integrate sustainability principles into SEA. In particular, most of the attention is given to mitigation and compensation measures, rather than to actual attempts to propose more sustainable planning decisions in the first place. Concerning the proposed framework of analysis, further research is required to clarify equity concerns and particularly to identify suitable indicators for operationalizing the concepts of intra/inter-generational equity in decision-making. -- Highlights: ► A framework was developed in order to evaluate planning against sustainability criteria. ► The framework was applied to analyse how sustainable principles are addressed in 15 Italian SEA reports. ► Over 85% of the reports addressed, to some extent, at least 40% of the framework questions. ► Criteria explicitly linked to intra and inter-generational equity are rarely addressed.

  2. Management and operating contractor plan for transition to the project Hanford Management Contractor

    SciTech Connect (OSTI)

    Waite, J.L., Westinghouse Hanford

    1996-06-27

    This is Revision 1 to the M{ampersand}O Contractor Plan for Transition to the Project Hanford Management Contractor.

  3. Microsoft Word - DOE-CBFO-01-3107 PDP Management Plan_rev 8_final

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CBFO-01-3107 PERFORMANCE DEMONSTRATION PROGRAM MANAGEMENT PLAN Revision 8 February 2016 ... Plan February 2016 2 Performance Demonstration Program Management Plan DOE...

  4. Environmental Management Los Alamos Field Office Corrective Action Plan -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radiological Release Phase II | Department of Energy Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II On March 22, 2015, the Department of Energy established an Environmental Management Los Alamos Field Office (EM-LA) responsible for management of the environmental restoration and the legacy waste management programs at Los Alamos National Laboratory (LANL).

  5. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    SciTech Connect (OSTI)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  6. DOE Strategic Human Capital Plan (FY 2011 - 2015) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Human Capital Plan (FY 2011 - 2015) DOE Strategic Human Capital Plan (FY 2011 - 2015) The Strategic Human Capital Plan sets forth the framework for managing the ...

  7. TWRS systems engineering software configuration management plan

    SciTech Connect (OSTI)

    Porter, P.E.

    1996-10-09

    This plan delineates the requirements for control of software developed and supported by the Tank Waste Remediation System (TWRS) Technical Integration organization. The information contained in this plan shall assist employees involved with software modification and configuration control.

  8. Framework for integration of urban planning, strategic environmental assessment and ecological planning for urban sustainability within the context of China

    SciTech Connect (OSTI)

    He Jia; Bao Cunkuan; Shu Tingfei; Yun Xiaoxue; Jiang Dahe; Brwon, Lex

    2011-11-15

    Sustainable development or sustainability has been highlighted as an essential principle in urban master planning, with increasing recognition that uncontrollable urbanization may well give rise to various issues such as overexploitation of natural resources, ecosystem destruction, environmental pollution and large-scale climate change. Thus, it is deemed necessary to modify the existing urban and regional administrative system so as to cope with the challenges urban planning is being confronted with and realize the purpose of urban sustainability. This paper contributed to proposing a mechanism which helps to make urban planning with full consideration of issues with respect to sustainable development. We suggested that the integration of urban planning, SEA and ecological planning be a multi-win strategy to offset deficiency of each mentioned political tool being individually applied. We also proposed a framework where SEA and ecological planning are fully incorporated into urban planning, which forms a two-way constraint mechanism to ascertain environmental quality of urban planning, although in practice, planning and SEA processes may conditionally be unified. Moreover, as shown in the case study, the integration of the three political tools may be constrained due to slow changes in the contextual factors, in particular the political and cultural dimensions. Currently within the context of China, there may be three major elements which facilitate integration of the three political tools, which are (1) regulatory requirement of PEIA on urban planning, (2) the promotion or strong administrative support from government on eco-district building, and (3) the willingness of urban planners to collaborate with SEA experts or ecologists.

  9. A modeling framework for investment planning in interdependent infrastructures in multi-hazard environments.

    SciTech Connect (OSTI)

    Brown, Nathanael J. K.; Gearhart, Jared Lee; Jones, Dean A.; Nozick, Linda Karen; Prince, Michael

    2013-09-01

    Currently, much of protection planning is conducted separately for each infrastructure and hazard. Limited funding requires a balance of expenditures between terrorism and natural hazards based on potential impacts. This report documents the results of a Laboratory Directed Research&Development (LDRD) project that created a modeling framework for investment planning in interdependent infrastructures focused on multiple hazards, including terrorism. To develop this framework, three modeling elements were integrated: natural hazards, terrorism, and interdependent infrastructures. For natural hazards, a methodology was created for specifying events consistent with regional hazards. For terrorism, we modeled the terrorist's actions based on assumptions regarding their knowledge, goals, and target identification strategy. For infrastructures, we focused on predicting post-event performance due to specific terrorist attacks and natural hazard events, tempered by appropriate infrastructure investments. We demonstrate the utility of this framework with various examples, including protection of electric power, roadway, and hospital networks.

  10. SU-E-I-97: Smart Auto-Planning Framework in An EMR Environment (SAFEE)

    SciTech Connect (OSTI)

    Zhang, B; Chen, S; Mutaf, Y; Prado, K; D'Souza, W

    2014-06-01

    Purpose: Our Radiation Oncology Department uses clinical practice guidelines for patient treatment, including normal tissue sparing and other dosimetric constraints. These practice guidelines were adapted from national guidelines, clinical trials, literature reviews, and practitioner's own experience. Modern treatment planning systems (TPS) have the capability of incorporating these practice guidelines to automatically create radiation therapy treatment plans with little human intervention. We are developing a software infrastructure to integrate clinical practice guidelines and radiation oncology electronic medical record (EMR) system into radiation therapy treatment planning system (TPS) for auto planning. Methods: Our Smart Auto-Planning Framework in an EMR environment (SAFEE) uses a software pipeline framework to integrate practice guidelines,EMR, and TPS together. The SAFEE system starts with retrieving diagnosis information and physician's prescription from the EMR system. After approval of contouring, SAFEE will automatically create plans according to our guidelines. Based on clinical objectives, SAFEE will automatically select treatment delivery techniques (such as, 3DRT/IMRT/VMAT) and optimize plans. When necessary, SAFEE will create multiple treatment plans with different combinations of parameters. SAFEE's pipeline structure makes it very flexible to integrate various techniques, such as, Model-Base Segmentation (MBS) and plan optimization algorithms, e.g., Multi-Criteria Optimization (MCO). In addition, SAFEE uses machine learning, data mining techniques, and an integrated database to create clinical knowledgebase and then answer clinical questions, such as, how to score plan quality or how volume overlap affects physicians' decision in beam and treatment technique selection. Results: In our institution, we use Varian Aria EMR system and RayStation TPS from RaySearch, whose ScriptService API allows control by external programs. These applications are

  11. Jefferson Lab Project Management & Integrated Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FEL Contact Our Staff Directorate Project Control System Manual Technical Engineering Development Facility (TEDF) Utilities Infrastructure Modernization (UIM) Office of Project Management Org Chart Project Management Office Kelly K. Krug, Project Management Office Manager (757) 269-6044, krug@jlab.org Christine Fragapane, Project Management Executive Assistant (757) 269-7502, chummel@jlab.org Matrixed: Claus H. Rode, 12 GeV Upgrade Project Manager (757) 269-7511, rode@jlab.org Program

  12. NNSA Releases Annual Stockpile Stewardship & Management Plan | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration | (NNSA) Releases Annual Stockpile Stewardship & Management Plan March 19, 2015 Annual Report Provides Insight into Vital National Security Programs WASHINGTON, DC - The Department of Energy's National Nuclear Security Administration (NNSA) has released its Fiscal Year 2016 Stockpile Stewardship and Management Plan (SSMP). The FY16 SSMP documents NNSA's 25-year strategic plan for accomplishing its core stockpile stewardship mission area of maintaining the

  13. Configuration Management Plan for the Tank Farm Contractor

    SciTech Connect (OSTI)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  14. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Contact Legacy Management 24-hour Monitored Security Telephone Number (877) 695-5322 This page intentionally left blank U.S. Department of Energy Comprehensive Legacy Management ...

  15. Revised Acquisition Guide Chapter 42.5, Contract Management Planning

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) has been on GAO's High Risk List for the past several years as a result of inadequate contract and project management. Accordingly, the improvement of contract administration is a critical issue for DOE. The Acquisition Guide chapter on Contract Management Planning has been completely revised to address this matter. The revised chapter 42.5, entitled Contract Management Planning is attached.

  16. Office of Environmental Management Work Planning and Control Oversight |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Office of Environmental Management Work Planning and Control Oversight Office of Environmental Management Work Planning and Control Oversight May 16, 2013 Presenter: Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office Topics Covered: Contractor Good Practices: All contractors evaluate WP&C as part of their CAS URS performing corporate Phase II implementation reviews at sites where they are EM's lead contractor NWP (WIPP contractor) implemented

  17. Tank waste remediation system configuration management implementation plan

    SciTech Connect (OSTI)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.

  18. Tank waste remediation system tank waste retrieval risk management plan

    SciTech Connect (OSTI)

    Klimper, S.C.

    1997-11-07

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.

  19. 2012 Annual Planning Summary for Legacy Management

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Legacy Management.

  20. Finance and supply management project execution plan

    SciTech Connect (OSTI)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  1. Natural Resource Management Plan for Brookhaven National Laboratory

    SciTech Connect (OSTI)

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  2. Social Impact Management Plans: Innovation in corporate and public policy

    SciTech Connect (OSTI)

    Franks, Daniel M.; Vanclay, Frank

    2013-11-15

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  3. Software Configuration Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This template is used for documenting the configuration management methodology, tools, techniques, roles and responsibilities and tasks for a systems development project Software ...

  4. LANDS WITH WILDERNESS CHARACTERISTICS, RESOURCE MANAGEMENT PLAN...

    Office of Scientific and Technical Information (OSTI)

    AND LAND EXCHANGES: CROSS-JURISDICTIONAL MANAGEMENT AND IMPACTS ON UNCONVENTIONAL FUEL DEVELOPMENT IN UTAH'S UINTA BASIN Utah is rich in oil shale and oil sands resources. ...

  5. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    SciTech Connect (OSTI)

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  6. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    SciTech Connect (OSTI)

    Fritz, R.L.

    1995-01-11

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities.

  7. FSM 2600 Wildlife, Fish, and Sensitive Plan Habitat Management...

    Open Energy Info (EERE)

    FSM 2600 Wildlife, Fish, and Sensitive Plan Habitat Management Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: FSM 2600...

  8. Bureau of Land Management - Plan of Utilization Checklist | Open...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Form: Bureau of Land Management - Plan of Utilization Checklist Abstract This page links to the BLM POU checklist....

  9. Title 43 CFR 1610 Resource Management Planning | Open Energy...

    Open Energy Info (EERE)

    10 Resource Management Planning Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 1610 Resource...

  10. Grout treatment facility land disposal restriction management plan

    SciTech Connect (OSTI)

    Hendrickson, D.W.

    1991-04-04

    This document establishes management plans directed to result in the land disposal of grouted wastes at the Hanford Grout Facilities in compliance with Federal, State of Washington, and Department of Energy land disposal restrictions. 9 refs., 1 fig.

  11. Software Configuration Management Plan for the Sodium Removal System

    SciTech Connect (OSTI)

    HILL, L.F.

    2000-03-06

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test.

  12. BPA selects new VP of Transmission Planning and Asset Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the electric utility industry and am honored to lead our Transmission Planning and Asset Management team." Cook came to BPA in March of 2004 as an electrical engineer for its...

  13. ITEP Developing Tribal Integrated Solid Waste Management Plans

    Broader source: Energy.gov [DOE]

    The Institute for Tribal Environmental Professionals (ITEP) is offering a two-day training course providing the tools tribes needs to develop and implement a successful tribal integrated solid waste management plan.

  14. Microsoft Word - C-Mod_Data_Managment_Plan_1.0_20140729.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data Management Plan (Version 1.0, 29 July 2014) Alcator C-Mod Data Management Plan The Alcator Data Management Plan (DMP) describes the elements and procedures for storing,...

  15. Clean energy for development investment framework: the World Bank Group action plan

    SciTech Connect (OSTI)

    2007-03-06

    In September 2005 the Development Committee requested the World Bank to develop an Investment Framework for Clean Energy and Development - in the context of the Gleneagles Communique on Climate Change, Clean Energy and Sustainable Development which was issued in July 2005. This Action Plan provides an update of work undertaken to date as well as actions planned by the World Bank Group (WBG) in support of the Clean Energy for Development Investment Framework (CEIF). The Action Plan relies on partnerships, including with the International Financial Institutions (IFIs) and the private sector. While it concentrates on maximizing and extending existing instruments, it provides for continued dialogue with governments and the private sector on new approaches to accelerate the transition to a low carbon economy. In addition to increased investments, the private sector has an important role to play in closing the investment gap in many countries. Projects such as Bujagali (Uganda), Nam Theun II (Laos) and China and India Thermal Power Plant Rehabilitation projects are examples of how partnerships with the private sector can work, both on financing but also on enhancing the overall regulatory framework for enhanced partnerships. The report was prepared for the 15 April 2007 Development Committee meeting, a joint committee of the Board of Governors of the World Bank and the International Monetary Fund on the transfer of real resources to developing countries. 3 figs., 3 tabs., 5 annexes.

  16. Environmental Management Headquarters Corrective Action Plan - Truck Fire |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Truck Fire Environmental Management Headquarters Corrective Action Plan - Truck Fire The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant (WIPP) February 5, 2014. The report identified 22 Conclusions and 35 Judgments of

  17. Spent Nuclear Fuel Project Configuration Management Plan

    SciTech Connect (OSTI)

    Reilly, M.A.

    1995-06-09

    This document is a rewrite of the draft ``C`` that was agreed to ``in principle`` by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project.

  18. Waste Management Committee Fiscal Year 2016 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 6 Work Plan Waste Management Committee Fiscal Year 2016 Work Plan Topics: TA-54 WIPP Recovery Operations Waste Stored at Waste Control Specialists Consent Order Deliverables FY'17 Budget National Waste Forum WM-FY16-WP - March 9, 2016 (107.69

  19. Information security management system planning for CBRN facilities

    SciTech Connect (OSTI)

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.; Glantz, Clifford S.; Landine, Guy P.; Bryant, Janet L.; Lewis, John; Mathers, Gemma; Rodger, Robert; Johnson, Christopher

    2015-12-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  20. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect (OSTI)

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  1. Developing a master plan for hospital solid waste management: A case study

    SciTech Connect (OSTI)

    Karamouz, Mohammad Zahraie, Banafsheh Kerachian, Reza Jaafarzadeh, Nemat Mahjouri, Najmeh

    2007-07-01

    Disposal of about 1750 tons of solid wastes per day is the result of a rapid population growth in the province of Khuzestan in the south west of Iran. Most of these wastes, especially hospital solid wastes which have contributed to the pollution of the environment in the study area, are not properly managed considering environmental standards and regulations. In this paper, the framework of a master plan for managing hospital solid wastes is proposed considering different criteria which are usually used for evaluating the pollution of hospital solid waste loads. The effectiveness of the management schemes is also evaluated. In order to rank the hospitals and determine the share of each hospital in the total hospital solid waste pollution load, a multiple criteria decision making technique, namely analytical hierarchy process (AHP), is used. A set of projects are proposed for solid waste pollution control and reduction in the proposed framework. It is partially applied for hospital solid waste management in the province of Khuzestan, Iran. The results have shown that the hospitals located near the capital city of the province, Ahvaz, produce more than 43% of the total hospital solid waste pollution load of the province. The results have also shown the importance of improving management techniques rather than building new facilities. The proposed methodology is used to formulate a master plan for hospital solid waste management.

  2. Emergency Management: Facility Emergency Plan Template

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    37 East and West Other SLAC Resources SLAC Site Security Main Gate 2551 On-site Palo Alto Fire Station Business Phone 2776 Facilities Department Service Request 8901 Normal working hours only SLAC Medical Department 2281 Waste Management 2399 Building manager Todd SLater Assistant building manager Brian Choi Publication date 1/14/2010 Revision date 1/14/2010 Prepared by Behzad Bozorg-Chami Approved by Todd Slater 20 Jun 2007 (updated AUG. 2010) SLAC-I-730-0A14J-001-R001 2 of 12 Emergency

  3. Systems engineering management and implementation plan for Project W-465, immobilized low-activity waste plan

    SciTech Connect (OSTI)

    Latray, D.A.

    1998-05-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  4. SES Performance Management System Plan Training | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon FY2016 SES Performance Management Training.pdf Responsible Contacts Keidra Biddiex Human Resources Specialist E-mail Keidra.Biddiex@hq.doe.gov Phone (202) 586-7693 Deanna ...

  5. Underground Test Area Subproject Project Management Plan, Revision 1

    SciTech Connect (OSTI)

    1998-06-03

    This Project Management Plan (PMP) describes the manner in which the US Department of Energy Nevada Operations Office (DOE/NV) will manage the Underground Test Area (UGTA) Subproject at the Nevada Test Site (NTS). It provides the basic guidance for implementation and the organizational structure for meeting the UGTA objectives.

  6. Configuration management program plan for Hanford site systems engineering

    SciTech Connect (OSTI)

    Kellie, C.L.

    1996-03-28

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  7. LLNL Site 200 Risk Management PlanAgust 2008

    SciTech Connect (OSTI)

    Pinkston, D; Johnson, M

    2008-07-30

    It is the Lawrence Livermore National Laboratory's (LLNL) policy to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage using the Integrated Safety Management System. The environment, safety, and health are to take priority in the planning and execution of work activities at the Laboratory. Furthermore, it is the policy of LLNL to comply with applicable ES&H laws, regulations, and requirements (LLNL Environment, Safety and Health Manual, Document 1.2, ES&H Policies of LLNL). The program and policies that improve LLNL's ability to prevent or mitigate accidental releases are described in the LLNL Environment, Health, and Safety Manual that is available to the public. The laboratory uses an emergency management system known as the Incident Command System, in accordance with the California Standardized Emergency Management System (SEMS) to respond to Operational Emergencies and to mitigate consequences resulting from them. Operational Emergencies are defined as unplanned, significant events or conditions that require time-urgent response from outside the immediate area of the incident that could seriously impact the safety or security of the public, LLNL's employees, its facilities, or the environment. The Emergency Plan contains LLNL's Operational Emergency response policies, commitments, and institutional responsibilities for managing and recovering from emergencies. It is not possible to list in the Emergency Plan all events that could occur during any given emergency situation. However, a combination of hazard assessments, an effective Emergency Plan, and Emergency Plan Implementing Procedures (EPIPs) can provide the framework for responses to postulated emergency situations. Revision 7, 2004 of the above mentioned LLNL Emergency Plan is available to the public. The most recent revision of the LLNL Emergency Plan LLNL-AM-402556, Revision 11, March 2008, has

  8. Wildland Fire Management Plan for Brookhaven National Laboratory

    SciTech Connect (OSTI)

    Green,T.

    2009-10-23

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site

  9. Information Resources Management Strategic Plan Appendix FY2014-2018

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan Appendix FY2014-2018 IRM 2 U.S. Department of Energy FY 2014-2018 doe irm strategic plan Appendix: Strategic Planning Process The FY 2014-2018 Department of Energy (DOE) Information Resources Management (IRM) Strategic Plan creates a cohesive connection among more than 15 Federal, DOE, and Office of the Chief Information Officer (OCIO) strategic documents that provide guidance to the Department on issues related to information and IT. Guidance Documents for the FY 2014-2018 DOE IRM

  10. TWRS safety and technical integration risk management plan

    SciTech Connect (OSTI)

    Fordham, R.A.

    1996-03-12

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization.

  11. Spent Nuclear Fuel project systems engineering management plan

    SciTech Connect (OSTI)

    Womack, J.C.

    1995-10-03

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  12. Habitat planning, maintenance and management working group

    SciTech Connect (OSTI)

    1997-03-01

    The Gulf of Mexico (GOM), called {open_quotes}America`s Sea,{close_quotes} is actually a small ocean basin covering over 1.5 million square kilometers. Because of the multiple uses, diversity, and size of the Gulf`s resources, management is shared by a number of governmental agencies including the Minerals Management Service, the Gulf of Mexico Fishery Management Council, the Gulf States Marine Fisheries Commission, National Marine Fisheries Service, the US Coast Guard, the US Army Corps of Engineers, and the five Gulf states fisheries agencies. All of these entities share a common goal of achieving optimum sustainable yield to maximize geological, biological, social, and economic benefits from these resources. These entities also share a common theme that the successful management of the northern GOM requires maintenance and enhancement of both the quantity and quality of habitats. A closer look at the GOM shows the sediment to be clearly dominated by vast sand and mud plains. These soft bottom habitats are preferred by many groundfish and shrimp species and, thus, have given rise to large commercial fisheries on these stocks. Hard bottom and reef habitats, on the other hand, are limited to approximately 1.6% of the total area of the Gulf, so that, while there are high demands by commercial and recreational fishermen for reef associated species, the availability of habitat for these stocks is limited. The thousands of oil and gas structures placed in the Gulf have added significant amounts of new hard substrate. The rigs-to-reefs concept was a common sense idea with support from environmental user groups and the petroleum industry for preserving a limited but valuable habitat type. As long as maximizing long-term benefits from the Gulf s resources for the greatest number of users remains the goal, then programs such as Rigs-to-Reefs will remain an important tool for fisheries and habitat managers in the Gulf.

  13. Information Technology Standards Program management plan

    SciTech Connect (OSTI)

    1998-05-01

    This document presents a logical and realistic plan to implement the Information Technology (IT) Standards Program throughout the Department of Energy (DOE). It was developed by DOE Chief Information Officer (CIO) staff, with participation from many other individuals throughout the DOE complex. The DOE IT Standards Program coordinates IT standards activities Department-wide, including implementation of standards to support the DOE Information Architecture. The Program is voluntary, participatory, and consensus-based. The intent is to enable accomplishment of the DOE mission, and the Program is applicable to all DOE elements, both Federal and contractor. The purpose of this document is to describe the key elements of the DOE IT Standards Program.

  14. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  15. Aircraft de-icing best management plans

    SciTech Connect (OSTI)

    Simpson, A.

    1997-12-31

    The purpose of this paper is to summarize the environmental impact of glycol-based de-icing fluids and the best management practices utilized at Canadian airports. The operational, safety and environmental effects of glycol are discussed as well as the management instruments available to address these areas of concern. In today`s highly mobile society, increasing air travel necessitates an awareness of flight safety by the aviation industry. This is most evident during the inclement winter season when de-icing operations are mandatory. De-icing fluids are both a safety and an environmental concern. Although glycol-based de-icers are applied to ensure flight safety, the release of this chemical has a detrimental effect on the environment.

  16. Excess Uranium Inventory Management Plan.pdf

    Office of Environmental Management (EM)

    3 Consolidated Financial Statements OAS-FS-14-03 December 2013 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 December 12, 2013 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on the "Department of Energy's Fiscal Year 2013 Consolidated Financial Statements" Pursuant to requirements established by the Government Management Reform Act of 1994, the

  17. Hanford Sampling Quality Management Plan (HSQMP)

    SciTech Connect (OSTI)

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control.

  18. Master plan: Guntersville Reservoir Aquatic Plant Management. Executive summary

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    In 1989, Congress provided funding to start a five-year comprehensive project to manage aquatic plants in Guntersville Reservoir, to be jointly implemented by the US Army Corps of Engineers (Corps) and Tennessee Valley Authority (TVA). TVA serves as the overall project coordinator and is the lead agency for this project. Known as the Joint Agency Guntersville Project (JAGP), the project will test and demonstrate innovative management technologies, and incorporate the most effective technologies into a comprehensive aquatic plant management plan for Guntersville Reservoir. The JAGP is intended to serve as a National Demonstration Project for aquatic plant management. As part of this JAGP, the Master Plan for Aquatic Plant Management for the Guntersville Reservoir Project, Alabama-Tennessee is authorized by Corps Contract Number DACW62-90-C-0067.

  19. Oak Ridge National Laboratory Waste Management Plan. Revision 1

    SciTech Connect (OSTI)

    Forgy, Jr., J. R.

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  20. Characterization program management plan for Hanford K Basin spent nuclear fuel

    SciTech Connect (OSTI)

    Lawrence, L.A.

    1998-05-14

    The management plan developed to characterize the K Basin Spent Nuclear Fuel was revised to incorporate actions necessary to comply with the Office of Civilian Radioactive Waste Management Quality Assurance Requirements Document 0333P. This plan was originally developed for Westinghouse Hanford Company and Pacific Northwest National Laboratory to work together on a program to provide characterization data to support removal, conditioning, and subsequent dry storage of the spent nuclear fuels stored at the Hanford K Basins. This revision to the Program Management Plan replaces Westinghouse Hanford Company with Duke Engineering and Services Hanford, Inc., updates the various activities where necessary, and expands the Quality Assurance requirements to meet the applicable requirements document. Characterization will continue to utilize the expertise and capabilities of both organizations to support the Spent Nuclear Fuels Project goals and objectives. This Management Plan defines the structure and establishes the roles for the participants providing the framework for Duke Engineering and Services Hanford, Inc. and Pacific Northwest National Laboratory to support the Spent Nuclear Fuels Project at Hanford.

  1. Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

    Office of Energy Efficiency and Renewable Energy (EERE)

    Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

  2. Environmental planning and priorities for the manager

    SciTech Connect (OSTI)

    Eggleston, T.E. )

    1993-01-01

    Industry and government spend in excess of $100 billion each year on pollution control. These funds are producing cleaner land, air, and water. They have also spawned a pollution control industry which today employs more than 175,000 people. While significant, this is only the initial investment of capital and human talent that cleaning up the environment will demand through the 1990's and into the next century. Industry is in the early phases of an explosion of environmentally-oriented activity. Industries who manage their priorities and respond proactively on environmental issues will be the more profitable in an economy increasingly influenced by environmental regulations and consumer activism. A series of issues will most likely dominate management of environmental concerns, including: pollution prevention--reducing pollutants before having to clean them up; recycling--reuse limits disposal problems while reducing pollutants generated by new manufacturing; private-public partnerships--these contractual relationships between public and private partners will become increasingly popular; energy use although large strides have been made in energy conservation, much remains to be done; technology innovation--this is the most fundamental tool for use in improving environmental quality. In order for industry to respond to the need, government will have to implement a series of economic, environmental, and social policies. Business then becomes the key element in advancing the policies established by government.

  3. ORNL long-range environmental and waste management plan

    SciTech Connect (OSTI)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  4. DOE - Office of Legacy Management -- Bonus_Framework

    Office of Legacy Management (LM)

    and Decommissioning (D&D) Program and Nevada Offsites Project, the Office of Legacy Management ensures compliance with DOE Order 5400.1, "General Environmental Protection...

  5. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect (OSTI)

    DAVIS, M.

    2005-04-01

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  6. Energy management planning and control in a large industrial facility

    SciTech Connect (OSTI)

    Rood, L.; Korber, J.

    1995-06-01

    Eastman Kodak`s Kodak Park Manufacturing facility is a collection of hundreds of buildings and millions of square feet operated by dozens of semi-autonomous manufacturing units. The facility is served by a centralized Utilities system which cogenerates electricity and distributes steam, chilled water, compressed air, and several other services throughout the site. Energy management at Kodak Park has been active since the 70`s. In 1991, the Utilities Division took ownership of a site wide energy thrust to address capacity limitations of electric, compressed air and other services. Planning and organizing a program to meet Utilities Division goals in such a large complex site was a slightly daunting task. Tracking progress and keeping on schedule is also a challenge. The authors will describe innovative use of a project management software program called Open Plan{reg_sign} to accomplish much of the planning and control for this program. Open Plan{reg_sign} has been used since the initial planning to the current progress of about 50% completion of the program. Hundreds of activities performed by dozens of resource people are planned and tracked. Not only the usual cost and schedule information is reported, but also the schedule for savings in terms of kilowatt-hours, pounds of steam, etc. These savings schedules are very useful for tracking against energy goals and Utilities business planning. Motivation of the individual departments to participate in the program and collection of data from these departments will also be discussed.

  7. Configuration management program plan for Hanford site systems engineering

    SciTech Connect (OSTI)

    Hoffman, A.G.

    1994-11-14

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  8. Waste Isolation Pilot Plant land management plan

    SciTech Connect (OSTI)

    1996-05-01

    On October 30, 1992, the WIPP Land Withdrawal Act became law. This Act transferred the responsibility for the management of the WIPP Land Withdrawal Area (WILWA) from the Secretary of the Interior to the Secretary of Energy. In accordance with sections 3(a)(1) and (3) of the Act, these lands {open_quotes}{hor_ellipsis}are withdrawn from all forms of entry, appropriation, and disposal under the public land laws{hor_ellipsis}{close_quotes}and are reserved for the use of the Secretary of Energy {open_quotes}{hor_ellipsis}for the construction, experimentation, operation, repair and maintenance, disposal, shutdown, monitoring, decommissioning, and other activities, associated with the purposes of WIPP as set forth in the Department of Energy National Security and Military Applications of Nuclear Energy Act of 1980 and this Act.{close_quotes}. As a complement to this LMP, a MOU has been executed between the DOE and the BLM, as required by section 4(d) of the Act. The state of New Mexico was consulted in the development of the MOU and the associated Statement of Work (SOW).

  9. SAPHIRE 8 Software Configuration Management Plan

    SciTech Connect (OSTI)

    Curtis Smith

    2010-01-01

    The INL software developers use version control for both the formally released SAPHIRE versions, as well as for source code. For each formal release of the software, the developers perform an acceptance test: the software must pass a suite of automated tests prior to official release. Each official release of SAPHIRE is assigned a unique version identifier. The release is bundled into a standard installation package for easy and consistent set-up by individual users. Included in the release is a list of bug fixes and new features for the current release, as well as a history of those items for past releases. Each formal release of SAPHIRE will have passed an acceptance test. In addition to assignment of a unique version identifier for an official software release, each source code file is kept in a controlled library. Source code is a collection of all the computer instructions written by developers to create the finished product. The library is kept on a server, where back-ups are regularly made. This document describes the configuration management approach used as part of the SAPHIRE development.

  10. Project management plan for Project W-320, Tank 241-C-106 sluicing

    SciTech Connect (OSTI)

    Phillips, D.R.

    1994-12-01

    This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987).

  11. Strategic plan for Hanford Site Environmental Restoration Information Management

    SciTech Connect (OSTI)

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  12. DOE Strategic Human Capital Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The current Strategic Human Capital Plan (SHCP) sets forth the framework for managing the Department of Energy's (DOE) human capital system through 2020. This Plan, which replaces ...

  13. Advanced Hybrid Particulate Collector Project Management Plan

    SciTech Connect (OSTI)

    Miller, S.J.

    1995-11-01

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

  14. Sandia National Laboratories, California sewer system management plan.

    SciTech Connect (OSTI)

    Holland, Robert C.

    2010-02-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Site Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan. Elements of this Plan are under development in accordance with the SWRCB's schedule.

  15. Wildland Fire Management Plan for Brookhaven National Laboratory

    SciTech Connect (OSTI)

    Schwager, K.; Green, T. M.

    2014-10-01

    The DOE policy for managing wildland fires requires that all areas managed by DOE and/or Its various contractors which can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wildland fire, operational, and prescribed fires. FMPs provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. The plan will be reviewed periodically to ensure fire program advances and will evolve with the missions of DOE and BNL.

  16. Office of Legacy Management's Strategic Plan 2016-2025 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Office of Legacy Management's Strategic Plan 2016-2025 Office of Legacy Management's Strategic Plan 2016-2025 Office of Legacy Management's Strategic Plan 2016-2025 (27.51 KB) More Documents & Publications LM 2016-2025 Strategic Plan Program Update: 2nd Quarter 2016 Program Update: 2nd Quarter 2015

  17. Systems Engineering Plan and project record Configuration Management Plan for the Mixed Waste Disposal Initiative

    SciTech Connect (OSTI)

    Bryan, W.E.; Oakley, L.B.

    1993-04-01

    This document summarizes the systems engineering assessment that was performed for the Mixed Waste Disposal Initiative (MWDI) Project to determine what types of documentation are required for the success of the project. The report also identifies the documents that will make up the MWDI Project Record and describes the Configuration Management Plan describes the responsibilities and process for making changes to project documentation.

  18. The ORNL Surplus Facilities Management Program Long Range Plan

    SciTech Connect (OSTI)

    Myrick, T.E.

    1984-09-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy`s (DOE) National SFMP, administered by the Richland Operations Office. This program was established to provide for the management of DOE surplus radioactively contaminated facilities from the end of their operating life until final facility disposition is completed. As part of this program, the ORNL SFMP oversees some 76 individual surplus facilities, ranging in complexity from abandoned waste storage tanks to large experimental reactors. The ORNL SFMP has prepared this Long Range Plan to outline the long-term management strategy for those facilities included in the program. The primary objective of this plan are to: (1) develop a base of information for each ORNL SFMP facility, (2) conduct preliminary decommissioning analyses to identify feasible alternatives, (3) assess the current and future risk of each facility, (4) establish a priority list for the decommissioning projects, and (5) integrate the individual project costs and schedules into an overall program schedule and cost estimate for the ORNL site. The Long Range Plan also provides an overview of the ORNL SFMP management structure, specifies the decommissioning criteria to be employed, and identifies special technical problems, research and development needs, and special facilities and equipment that may be required for decommissioning operations.

  19. Tank monitor and control system (TMACS) software configuration management plan

    SciTech Connect (OSTI)

    GLASSCOCK, J.A.

    1999-05-13

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments.

  20. Breckinridge Project, initial effort. Report VI. Project Management Plan

    SciTech Connect (OSTI)

    1982-01-01

    Report VI presents a comprehensive plan for the management of the Breckinridge Project. For the purpose of this report, the project work is divided into five major project phases: Development, Engineering, Procurement, Construction, and Operations. The results of the Development Phase (Initial Effort) of the project are discussed in Section 1.0. This phase of the project was performed under a Cooperative Agreement with US Department of Energy and has produced 43 volumes of documentation. Fifteen volumes contain information of proprietary nature for patented processes and are therefore classified as Limited Access; however, twenty-eight volumes are not classified and are suitable for public dissemination. This Project Management Plan is a volume of the unclassified documentation. The other twenty-seven volumes contain comprehensive data on technical, financial, and environmental aspects of the project. Each of the four remaining project phases is presented starting with the extensive planning that will be performed and continuing through to the execution and completion of each phase. The major roles of the Operator, Ashland Synthetic Fuels, Inc. (ASFI), and the Managing Contractor are defined. Although a contract has not yet been executed with a Managing Contractor, the procedures, controls, organization and management philosophy of Bechtel Petroleum, Inc., are presented in this report as being representative of those used by contractors in the business of performing the engineering, procurement, and construction of projects of this size and complexity. The organizational structures of the Operator and the Managing Contractor are described, with designation of key project team personnel by job description and organization charts. Provisions for cost, schedule, and material control are described.

  1. Integrated Waste Treatment Unit GFSI Risk Management Plan

    SciTech Connect (OSTI)

    W. A. Owca

    2007-06-21

    This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP).

  2. Tank waste remediation system systems engineering management plan

    SciTech Connect (OSTI)

    Peck, L.G.

    1996-02-06

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation Systems (TWRS) implementation of U.S. Department of Energy (DOE) Systems Engineering (SE) policy provided in Tank Waste Remediation System Systems Engineering Management Policy, DOE/RL letter, 95-RTI-107, Oct. 31, 1995. This SEMP defines the products, process, organization, and procedures used by the TWRS Program to accomplish SE objectives. This TWRS SEMP is applicable to all aspects of the TWRS Program and will be used as the basis for tailoring SE to apply necessary concepts and principles to develop and mature the processes and physical systems necessary to achieve the desired end states of the program.

  3. Software configuration management plan for the Hanford site technical database

    SciTech Connect (OSTI)

    GRAVES, N.J.

    1999-05-10

    The Hanford Site Technical Database (HSTD) is used as the repository/source for the technical requirements baseline and programmatic data input via the Hanford Site and major Hanford Project Systems Engineering (SE) activities. The Hanford Site SE effort has created an integrated technical baseline for the Hanford Site that supports SE processes at the Site and project levels which is captured in the HSTD. The HSTD has been implemented in Ascent Logic Corporation (ALC) Commercial Off-The-Shelf (COTS) package referred to as the Requirements Driven Design (RDD) software. This Software Configuration Management Plan (SCMP) provides a process and means to control and manage software upgrades to the HSTD system.

  4. Waste management plan for Hanford spent nuclear fuel characterization activities

    SciTech Connect (OSTI)

    Chastain, S.A. [Westinghouse Hanford Co., Richland, WA (United States); Spinks, R.L. [Pacific Northwest Lab., Richland, WA (United States)

    1994-10-17

    A joint project was initiated between Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL) to address critical issues associated with the Spent Nuclear Fuel (SNF) stored at the Hanford Site. Recently, particular attention has been given to remediation of the SNF stored in the K Basins. A waste management plan (WMP) acceptable to both parties is required prior to the movement of selected material to the PNL facilities for examination. N Reactor and Single Pass Reactor (SPR) fuel has been stored for an extended period of time in the N Reactor, PUREX, K-East, and K-West Basins. Characterization plans call for transport of fuel material form the K Basins to the 327 Building Postirradiation Testing Laboratory (PTL) in the 300 Area for examination. However, PNL received a directive stating that no examination work will be started in PNL hot cell laboratories without an approved disposal route for all waste generated related to the activity. Thus, as part of the Characterization Program Management Plan for Hanford Spent Nuclear Fuel, a waste management plan which will ensure that wastes generated as a result of characterization activities conducted at PNL will be accepted by WHC for disposition is required. This document contains the details of the waste handling plan that utilizes, to the greatest extent possible, established waste handling and disposal practices at Hanford between PNL and WHC. Standard practices are sufficient to provides for disposal of most of the waste materials, however, special consideration must be given to the remnants of spent nuclear fuel elements following examination. Fuel element remnants will be repackaged in an acceptable container such as the single element canister and returned to the K Basins for storage.

  5. AN INTEGRATED MODELING FRAMEWORK FOR CARBON MANAGEMENT TECHNOLOGIES

    SciTech Connect (OSTI)

    Anand B. Rao; Edward S. Rubin; Michael B. Berkenpas

    2004-03-01

    CO{sub 2} capture and storage (CCS) is gaining widespread interest as a potential method to control greenhouse gas emissions from fossil fuel sources, especially electric power plants. Commercial applications of CO{sub 2} separation and capture technologies are found in a number of industrial process operations worldwide. Many of these capture technologies also are applicable to fossil fuel power plants, although applications to large-scale power generation remain to be demonstrated. This report describes the development of a generalized modeling framework to assess alternative CO{sub 2} capture and storage options in the context of multi-pollutant control requirements for fossil fuel power plants. The focus of the report is on post-combustion CO{sub 2} capture using amine-based absorption systems at pulverized coal-fired plants, which are the most prevalent technology used for power generation today. The modeling framework builds on the previously developed Integrated Environmental Control Model (IECM). The expanded version with carbon sequestration is designated as IECM-cs. The expanded modeling capability also includes natural gas combined cycle (NGCC) power plants and integrated coal gasification combined cycle (IGCC) systems as well as pulverized coal (PC) plants. This report presents details of the performance and cost models developed for an amine-based CO{sub 2} capture system, representing the baseline of current commercial technology. The key uncertainties and variability in process design, performance and cost parameters which influence the overall cost of carbon mitigation also are characterized. The new performance and cost models for CO{sub 2} capture systems have been integrated into the IECM-cs, along with models to estimate CO{sub 2} transport and storage costs. The CO{sub 2} control system also interacts with other emission control technologies such as flue gas desulfurization (FGD) systems for SO{sub 2} control. The integrated model is applied to

  6. Fast Flux Test Facility Closure Project - Project Management Plan

    SciTech Connect (OSTI)

    BEACH, R.R.

    2002-09-26

    The Fast Flux Test Facility (FFTF) Closure Project, Project Management Plan, Revision 5, provides the scope, cost, and schedule to achieve the most cost effective and expeditious closure of the FFTF to an assumed final end-state with the reactor vessel and the containment building, below the 5504 grade level, being entombed in place. Closure will be completed by December 2009 at a cost of $547 million.

  7. 42pt5ContractManagementPlanning.pdf | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    2pt5ContractManagementPlanning.pdf More Documents & Publications Acquisition Letter 2009-03 Acquisition Planning-Extending A Management and Operating Contract Without Full and Open...

  8. Solid Waste Information and Tracking System Client Server Conversion Project Management Plan

    SciTech Connect (OSTI)

    GLASSCOCK, J.A.

    2000-02-10

    The Project Management Plan governing the conversion of SWITS to a client-server architecture. The PMP describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion

  9. Case for Open-Source PEV Charge Management Data Framework

    SciTech Connect (OSTI)

    Markel, T.; Kuss, M.; Foster, J.; Manz, D.; Mahony, M.; Nielsen, M.; Reid, A.; Wilk, R. D.

    2012-01-01

    The future growth of electrified transportation could be enhanced through interaction with smart grid system architectures. This paper summarizes current literature regarding plug-in electric vehicle - renewables integration and highlights areas of need to implement such integration at a multi-utility scale. Future smart grid implementations hold the key to transferring information and control parameters between distributed and centralized decision agents. The discussion highlights the opportunity to leverage federal investments in grid renovation and electric vehicle introduction to create system-wide value from improved reliability and reduced fossil fuel consumption. An approach to scaling a previously defined 'green signal' methodology for electric vehicles will be detailed across a utility grid balancing region. The research will include a synopsis of the communications opportunities and challenges of coordinating the responses of many resources. The results are expected to show that, with some variation in the charge profiles of individual vehicles, the aggregate set can interface with grid management methods to significantly influence the ability to integrate distributed and centralized renewables to improve environmental quality.

  10. Data Management Plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Bryd, P.

    1994-01-01

    The purpose of this handbook is to assist environmental restoration (ER) projects in the preparation of a data management implementation plan (DMIP). The DMIP identifies and documents an ER project's requirements and responsibilities for the management, quality assurance, use, and archival of its environmental data. It is important that a project complete its DMIP in the early planning phase to ensure that the necessary and appropriate data management systems and personnel are in place before the project begins acquiring data. All ER projects that collect or use environmental data at the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Oak Ridge K-25 Site, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and surrounding onsite and offsite areas must prepare a DMIP. Project types that often collect environmental data include surveillance and maintenance, decontamination and decommissioning, remedial design/remedial action, and remedial investigation/feasibility studies. Even if a project does little environmental data management, a DMIP is required to document this fact.