1

Comparison of management, overhead, and direct costs of six projects managed by the Department of Energy and Government-Owned, Contractor-Operated Laboratories  

SciTech Connect (OSTI)

The report covers management, overhead, and direct cost data on six DOE projects - three managed directly by DOE, and three managed for DOE by government-owned, contractor-operated (GOCO) laboratories. These data provide comparison for decisions on contracting out for project management services. (GHT)

Not Available

1981-09-30T23:59:59.000Z

2

Direct/Indirect Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

1997-03-28T23:59:59.000Z

3

Target Cost Management Strategy  

E-Print Network [OSTI]

Target cost management (TCM) is an innovation of Japanese management accounting system and by common sense has been considered with great interest by practitioners. Nowadays, TCM related

Okano, Hiroshi

1996-01-01T23:59:59.000Z

4

Avoidable waste management costs  

SciTech Connect (OSTI)

This report describes the activity based costing method used to acquire variable (volume dependent or avoidable) waste management cost data for routine operations at Department of Energy (DOE) facilities. Waste volumes from environmental restoration, facility stabilization activities, and legacy waste were specifically excluded from this effort. A core team consisting of Idaho National Engineering Laboratory, Los Alamos National Laboratory, Rocky Flats Environmental Technology Site, and Oak Ridge Reservation developed and piloted the methodology, which can be used to determine avoidable waste management costs. The method developed to gather information was based on activity based costing, which is a common industrial engineering technique. Sites submitted separate flow diagrams that showed the progression of work from activity to activity for each waste type or treatability group. Each activity on a flow diagram was described in a narrative, which detailed the scope of the activity. Labor and material costs based on a unit quantity of waste being processed were then summed to generate a total cost for that flow diagram. Cross-complex values were calculated by determining a weighted average for each waste type or treatability group based on the volume generated. This study will provide DOE and contractors with a better understanding of waste management processes and their associated costs. Other potential benefits include providing cost data for sites to perform consistent cost/benefit analysis of waste minimization and pollution prevention (WMIN/PP) options identified during pollution prevention opportunity assessments and providing a means for prioritizing and allocating limited resources for WMIN/PP.

Hsu, K.; Burns, M.; Priebe, S.; Robinson, P.

1995-01-01T23:59:59.000Z

5

A Manager's Approach to Energy Cost Management  

E-Print Network [OSTI]

A major responsibility of management is the control and containment of operating costs. Energy costs are a major portion of the industrial budget. GM has developed a 3 phase approach to energy conservation. Phase I -Administrative Controls...

Spencer, R. J.

6

Estimating Specialty Costs - DOE Directives, Delegations, and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

project specialty costs and methods of estimating costs for specialty projects. g4301-1chp20.pdf -- PDF Document, 56 KB Writer: John Makepeace Subjects: Administration Management...

7

Cost Transfers Involving Sponsored Projects Directives and Procedures  

E-Print Network [OSTI]

Cost Transfers Involving Sponsored Projects Directives and Procedures Responsible Office: Office.................................................................................................................2 2. Project Management to a project when an award arrived after the budget period which would have allowed the transactions

Jawitz, James W.

8

Startup Costs - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and environmental projects, and estimating guidance for startup costs. g4301-1chp8.pdf -- PDF Document, 8 KB Writer: John Makepeace Subjects: Administration Management...

9

Unit costs of waste management operations  

SciTech Connect (OSTI)

This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ``cradle to grave``) cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics.

Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

1994-04-01T23:59:59.000Z

10

Direct/Indirect Costs - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(CCMD) and describes various estimating techniques for direct and indirect costs. g4301-1chp7.pdf -- PDF Document, 41 KB Writer: John Makepeace Subjects: ID: DOE G 430.1-1 Chp 7...

11

Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell...  

Broader source: Energy.gov (indexed) [DOE]

Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell Systems for Transportation Applications: 2012 Update Mass Production Cost Estimation of Direct Hydrogen PEM Fuel...

12

Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive Applications: Fuel Cell Tech Team Review Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive...

13

Cost Model and Cost Estimating Software - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is basically a cost model, which forms the basis for estimating software. g4301-1chp22.pdf -- PDF Document, 190 KB Writer: John Makepeace Subjects: Administration...

14

Check Estimates and Independent Costs - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

estimates and their procedures and various types of independent cost estimates. g4301-1chp13.pdf -- PDF Document, 33 KB Writer: John Makepeace Subjects: Administration Management...

15

Types of Cost Estimates - DOE Directives, Delegations, and Requirement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CURRENT DOE G 430.1-1 Chp 4, Types of Cost Estimates by John Makepeace Functional areas: Procurement, Project Management The chapter describes the estimates required on...

16

Extending Quality Management to Utility Costs  

E-Print Network [OSTI]

By installing permanent instrumentation and linking it to the appropriate software, a Utility Cost Management Information System, can be created which will identify where, when and how energy is used in a facility on a dynamic and real-time basis...

Holmes, W. A.

17

Waste Management Facilities Cost Information Report  

SciTech Connect (OSTI)

The Waste Management Facility Cost Information (WMFCI) Report, commissioned by the US Department of Energy (DOE), develops planning life-cycle cost (PLCC) estimates for treatment, storage, and disposal facilities. This report contains PLCC estimates versus capacity for 26 different facility cost modules. A procedure to guide DOE and its contractor personnel in the use of estimating data is also provided. Estimates in the report apply to five distinctive waste streams: low-level waste, low-level mixed waste, alpha contaminated low-level waste, alpha contaminated low-level mixed waste, and transuranic waste. The report addresses five different treatment types: incineration, metal/melting and recovery, shredder/compaction, solidification, and vitrification. Data in this report allows the user to develop PLCC estimates for various waste management options.

Feizollahi, F.; Shropshire, D.

1992-10-01T23:59:59.000Z

18

Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Mass Production Cost Estimation of Direct H 2 PEM Fuel Cell Systems for Transportation Applications: 2012 Update October 18, 2012 Prepared By: Brian D. James Andrew B. Spisak...

19

Cost-Competitive Advanced Thermoelectric Generators for Direct...  

Broader source: Energy.gov (indexed) [DOE]

Advanced Thermoelectric Generators for Direct Conversion of Vehicle Waste Heat into Useful Electrical Power Cost-Competitive Advanced Thermoelectric Generators for...

20

ORNL: Low-Cost Direct Bonded Aluminum (DBA) Substrates (Agreement...  

Broader source: Energy.gov (indexed) [DOE]

Low-Cost Direct Bonded Aluminum (DBA) Substrates H. -T. Lin, A. A. Wereszczak, and S. Waters Oak Ridge National Laboratory This presentation does not contain any proprietary,...

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Operating Costs - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

that all elements of the project have been considered and properly estimated. g4301-1chp9.pdf -- PDF Document, 14 KB Writer: John Makepeace Subjects: Administration Management...

22

Example Cost Codes for Construction Projects - DOE Directives...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and their corresponding cost codes that may be used for construction projects. g4301-1chp16.pdf -- PDF Document, 93 KB Writer: John Makepeace Subjects: Administration Management...

23

Cost Codes and the Work Breakdown Structure - DOE Directives...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WBS and the cost code system, and explains the interface between the two systems. g4301-1chp5.pdf -- PDF Document, 44 KB Writer: John Makepeace Subjects: Administration Management...

24

Life Cycle Cost Estimate - DOE Directives, Delegations, and Requiremen...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

chapter discusses life cycle costs and the role they play in planning. g4301-1chp23.pdf -- PDF Document, 52 KB Writer: John Makepeace Subjects: Administration Management...

25

Activity Based Costing - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

outlines the Activity Based Costing method and discusses applicable uses of ABC. g4301-1chp24.pdf -- PDF Document, 11 KB Writer: John Makepeace Subjects: Administration Management...

26

Use of Cost Estimating Relationships - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

must be aware so the Cost Estimating Relationships can be properly used. g4301-1chp18.pdf -- PDF Document, 41 KB Writer: John Makepeace Subjects: Administration Management...

27

Enforcement Project Management Handbook. Directive  

SciTech Connect (OSTI)

The handbook has been prepared as a basic reference and training manual to assist RPMs (Remedial Project Managers) and OSCs (On-Scene Coordinators) in planning, negotiating, and managing various enforcement actions.

Not Available

1991-01-01T23:59:59.000Z

28

Low-Cost Direct Bonded Aluminum (DBA) Substrates  

Broader source: Energy.gov (indexed) [DOE]

Low-Cost Direct Bonded Aluminum (DBA) Substrates H. -T. Lin, A. A. Wereszczak, M. L. Santella, and G. Muralidharan Oak Ridge National Laboratory (ORNL) This presentation does not...

29

Managing County Employee Health Care Costs The Problem  

E-Print Network [OSTI]

Managing County Employee Health Care Costs The Problem If food costs increased at same rate as health care, one dozen eggs would cost $80.20! 87.5% of health-care claims are due to employees cholesterol, and inactivity. Costs include unnecessary use of health-care services: 25% of doctor visits

30

Department of Energy Environmental Management cost infrastructure development program: Cost analysis requirements  

SciTech Connect (OSTI)

This report was prepared to support development of the Department of Energy Environmental Management cost infrastructure -- a new capability to independently estimate and analyze costs. Currently, the cost data are reported according to a structure that blends level of effort tasks with product and process oriented tasks. Also. the budgetary inputs are developed from prior year funding authorizations and from contractor-developed parametric estimates that have been adjusted to planned funding levels or appropriations. Consequently, it is difficult for headquarters and field-level activities to use actual cost data and technical requirements to independently assess the costs generated and identify trends, potential cost savings from process improvements, and cost reduction strategies.

Custer, W.R. Jr.; Messick, C.D.

1996-03-31T23:59:59.000Z

31

Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive Applications: Fuel Cell Tech Team Review  

Broader source: Energy.gov [DOE]

This presentation reports on direct hydrogen PEMFC manufacturing cost estimation for automotive applications.

32

Environmental management requirements/defensible costs project. Final report  

SciTech Connect (OSTI)

Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

NONE

1996-02-01T23:59:59.000Z

33

1366 Direct Wafer: Demolishing the Cost Barrier for Silicon Photovoltaics  

SciTech Connect (OSTI)

The goal of 1366 Direct Wafer™ is to drastically reduce the cost of silicon-based PV by eliminating the cost barrier imposed by sawn wafers. The key characteristics of Direct Wafer are 1) kerf-free, 156-mm standard silicon wafers 2) high throughput for very low CAPEX and rapid scale up. Together, these characteristics will allow Direct Wafer™ to become the new standard for silicon PV wafers and will enable terawatt-scale PV – a prospect that may not be possible with sawn wafers. Our single, high-throughput step will replace the expensive and rate-limiting process steps of ingot casting and sawing, thereby enabling drastically lower wafer cost. This High-Impact PV Supply Chain project addressed the challenges of scaling Direct Wafer technology for cost-effective, high-throughput production of commercially viable 156 mm wafers. The Direct Wafer process is inherently simple and offers the potential for very low production cost, but to realize this, it is necessary to demonstrate production of wafers at high-throughput that meet customer specifications. At the start of the program, 1366 had demonstrated (with ARPA-E funding) increases in solar cell efficiency from 10% to 15.9% on small area (20cm2), scaling wafer size up to the industry standard 156mm, and demonstrated initial cell efficiency on larger wafers of 13.5%. During this program, the throughput of the Direct Wafer furnace was increased by more than 10X, simultaneous with quality improvements to meet early customer specifications. Dedicated equipment for laser trimming of wafers and measurement methods were developed to feedback key quality metrics to improve the process and equipment. Subsequent operations served both to determine key operating metrics affecting cost, as well as generating sample product that was used for developing downstream processing including texture and interaction with standard cell processing. Dramatic price drops for silicon wafers raised the bar significantly, but the developments made under this program have increased 1366 confidence that Direct Wafers can be produced for ~$0.10/W, still nearly 50% lower than current industry best practice. Wafer quality also steadily improved throughout the program, both in electrical performance and geometry. The improvements to electrical performance were achieved through a combination of optimized heat transfer during growth, reduction of metallic impurities to below 10 ppbw total metals, and lowering oxygen content to below 2e17 atoms/cc. Wafer average thickness has been reduced below 200µm with standard deviation less than 20µm. Measurement of spatially varying thickness shortly after wafer growth is being used to continually improve uniformity by adjusting thermal conditions. At the conclusion of the program, 1366 has developed strong relationships with four leading Tier1 cell manufactures and several have demonstrated 17% cell efficiency on Direct Wafer. Sample volumes were limited, with the largest trial consisting of 300 Direct Wafers, and there remains strong pull for larger quantities necessary for qualification before sales contracts can be signed. This will be the focus of our pilot manufacturing scale up in 2014.

Lorenz, Adam [1366 Technologies] [1366 Technologies

2013-08-30T23:59:59.000Z

34

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

Application Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Application This report estimates fuel cell system cost for systems produced in the...

35

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

07 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update This report estimates fuel cell system cost for systems...

36

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Application Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Application This presentation reports on the status of mass production cost...

37

Risk management: Reducing brownfield cleanup costs  

SciTech Connect (OSTI)

Balancing environmental protection with economic vitality is crucial to maintaining competitiveness in world markets. One key initiative that has been identified as important to both environmental protection and the economy is the redevelopment of brownfields. Brownfield redevelopment can stimulate local economies that have been devastated by lost jobs and can recycle industrial land use, thereby preserving undeveloped lands. Many existing brownfield sites appear on the US Environmental Protection Agency`s (EPA) National Priority List (NPL), which designates over 1200 sites and is expected to grow to more than 2000 by the end of the decade. EPA estimates the cost of remediating the sites on the current list will approach $30 billion, with the average cost of remediating a site close to $25 million. Thousands of additional brownfield sites that do not appear on the NPL are listed under state cleanup programs.

Graves, N.

1997-08-01T23:59:59.000Z

38

Computerized management report system for monitoring manpower and cost  

SciTech Connect (OSTI)

Although most cost systems offer complete detail and traceability, not all provide timely detail in a concise form useful to senior management. This system was developed for a multifunction research organization funded from many sources. It extracts cost and manpower data from the general cost systems, summarizes it, compares it by program with previous cost periods, and presents it with minimum detail yet with maximum overview. The system monitors the basic manpower distribution of effort at the source, that is, the division time-card input. Cost data are taken from the central computer ahead of the print-out and report-distribution steps; thus, the summary information is available several days ahead of the detailed reports. This procedure has been regularly used for several months, and has proven to be a valuable tool in management action and planning. 9 figures.

Bullington, V.R.; Stephenson, R.L.; Cardwell, R.G.

1980-04-01T23:59:59.000Z

39

Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation Applications: 2013 Update Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems...

40

Development of a right-of-way cost estimation and cost estimate management process framework for highway projects  

E-Print Network [OSTI]

Escalation of right-of-way (ROW) costs have been shown to be a prime contributor to project cost escalation in the highway industry. Two problems contribute to ROW cost escalation: 1) the ROW cost estimation and cost estimate management process...

Lucas, Matthew Allen

2009-05-15T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Cost-Competitive Advanced Thermoelectric Generators for Direct...  

Broader source: Energy.gov (indexed) [DOE]

vehicles by 5% using advanced low cost TE technology: - Low cost materials, modules, heat exchangers, power conditioning, and vehicle integration for exhaust gas waste heat...

42

The External Damage Cost of Direct Noise From Motor Vehicles  

E-Print Network [OSTI]

is not an external or unaccounted-for cost of highways ifland, then there is an unaccounted- for cost of highway use;

Delucchi, Mark A.; Hsu, Shi-Ling

1996-01-01T23:59:59.000Z

43

Facilitating Sound, Cost-Effective Federal Energy Management (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet is an overview of the U.S. Department of Energy's Federal Energy Management Program (FEMP). The Federal Government, as the nation's largest energy consumer, has a tremendous opportunity and acknowledged responsibility to lead by example. The U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP) plays a critical role in this effort. FEMP facilitates the Federal Government's implementation of sound, cost-effective energy management and investment practices to enhance the nation's energy security and environmental stewardship. FEMP does this by focusing on the needs of its Federal customers, delivering an array of services across a variety of program areas.

Not Available

2012-03-01T23:59:59.000Z

44

Optimal Power Cost Management Using Stored Energy in Data Centers  

E-Print Network [OSTI]

Optimal Power Cost Management Using Stored Energy in Data Centers Rahul Urgaonkar, Bhuvan Urgaonkar of uninterrupted power supply (UPS) units as energy storage devices. This rep- resents a deviation from the usual average electric utility bill in a data center. Us- ing the technique of Lyapunov optimization, we develop

Giles, C. Lee

45

Optimal Power Cost Management Using Stored Energy in Data Centers  

E-Print Network [OSTI]

the aver- age price of 1 MW-Hour of electricity. Consequently, mini- mization of energy consumption needOptimal Power Cost Management Using Stored Energy in Data Centers Rahul Urgaonkar, Bhuvan Urgaonkar that arise by the use of uninterrupted power supply (UPS) units as energy storage devices. This rep- resents

Urgaonkar, Bhuvan

46

Low Cost 2014, UMass Cranberry Station 1 REDUCING COSTS IN CRANBERRY MANAGEMENT 2014  

E-Print Network [OSTI]

2014, UMass Cranberry Station 1 REDUCING COSTS IN CRANBERRY MANAGEMENT 2014 These are general the flood. Research has shown that holding LW for the full 4 weeks eliminates all overwintering cranberry at this link: http://scholarworks.umass.edu/cranberry_community_presentations/1/ Fertilizer Analyze all your

Massachusetts at Amherst, University of

47

TRU Waste Management Program cost/schedule optimization analysis  

SciTech Connect (OSTI)

The cost/schedule optimization task is a necessary function to insure that program goals and plans are optimized from a cost and schedule aspect. Results of this study will offer DOE information with which it can establish, within institutional constraints, the most efficient program for the long-term management and disposal of contact handled transuranic waste (CH-TRU). To this end, a comprehensive review of program cost/schedule tradeoffs has been made, to identify any major cost saving opportunities that may be realized by modification of current program plans. It was decided that all promising scenarios would be explored, and institutional limitations to implementation would be described. Since a virtually limitless number of possible scenarios can be envisioned, it was necessary to distill these possibilities into a manageable number of alternatives. The resultant scenarios were described in the cost/schedule strategy and work plan document. Each scenario was compared with the base case: waste processing at the originating site; transport of CH-TRU wastes in TRUPACT; shipment of drums in 6-Packs; 25 year stored waste workoff; WIPP operational 10/88, with all sites shipping to WIPP beginning 10/88; and no processing at WIPP. Major savings were identified in two alternate scenarios: centralize waste processing at INEL and eliminate rail shipment of TRUPACT. No attempt was made to calculate savings due to combination of scenarios. 1 ref., 5 figs., 1 tab. (MHB)

Detamore, J.A. (Rockwell International Corp., Albuquerque, NM (United States). Joint Integration Office); Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A. (Stoller (S.M.) Corp., Boulder, CO (United States))

1985-10-01T23:59:59.000Z

48

Starship Sails Propelled by Cost-Optimized Directed Energy  

E-Print Network [OSTI]

Microwave propelled sails are a new class of spacecraft using photon acceleration. It is the only method of interstellar flight that has no physics issues. Laboratory demonstrations of basic features of beam-driven propulsion, flight, stability ('beam-riding'), and induced spin, have been completed in the last decade, primarily in the microwave. It offers much lower cost probes after a substantial investment in the launcher. Engineering issues are being addressed by other applications: fusion (microwave, millimeter and laser sources) and astronomy (large aperture antennas). There are many candidate sail materials: carbon nanotubes and microtrusses, graphene, beryllium, etc. For acceleration of a sail, what is the cost-optimum high power system? Here the cost is used to constrain design parameters to estimate system power, aperture and elements of capital and operating cost. From general relations for cost-optimal transmitter aperture and power, system cost scales with kinetic energy and inversely with sail di...

Benford, James

2011-01-01T23:59:59.000Z

49

Manufacturing Cost Analysis of 10 kW and 25 kW Direct Hydrogen...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Manufacturing Cost Analysis of 10 kW and 25 kW Direct Hydrogen Polymer Electrolyte Membrane (PEM) Fuel Cell for Material Handling Applications Manufacturing Cost Analysis of 10 kW...

50

Cost management in project alliances: a framework based on interorganizational settings.  

E-Print Network [OSTI]

??This research aims to study the economics of alliancing and to explore management controls in alliances by drawing upon Transaction Cost Economics and interorganizational management… (more)

Chen, G

2013-01-01T23:59:59.000Z

51

DIRECT COSTS OF DISABLING WORKPLACE INJURIES GROW 2.5 PERCENT  

Broader source: Energy.gov [DOE]

April 7, 2003 Annual Liberty Mutual Workplace Safety Index Shows Direct Costs of the Three Leading Causes of Workplace Incidents Grew Significantly Faster...

52

Cost Estimation Package - DOE Directives, Delegations, and Requirement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

components (or elements) of the cost estimation package and their documentation. g4301-1chp2.pdf -- PDF Document, 10 KB Writer: John Makepeace Subjects: ID: DOE G 430.1-1 Chp 2...

53

Examples of Cost Estimation Packages - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1997 CRD: No DNFSB: No Related History Exemptions Standards Related to: DOE G 430.1-1 Chp 9, Operating Costs DOE G 430.1-1 Chp 19, Data Collection and Normalization for the...

54

Cost Estimating Guide, Table of Contents - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1997 CRD: No DNFSB: No Related History Exemptions Standards Related to: DOE G 430.1-1 Chp 9, Operating Costs DOE G 430.1-1 Chp 19, Data Collection and Normalization for the...

55

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

E-Print Network [OSTI]

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications number of vehicles it represents, DOE has established detailed cost targets for automotive fuel cell and track the cost of automotive fuel cell systems as progress is made in fuel cell technology. The purpose

56

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

E-Print Network [OSTI]

Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2010 Update it represents, the DOE has established detailed cost targets for automotive fuel cell systems and components of automotive fuel cell systems as progress is made in fuel cell technology. The purpose of these cost analyses

57

Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for  

E-Print Network [OSTI]

1 Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation (2012), annually updated costs analyses will be conducted for PEM fuel cell passenger buses as well established detailed cost targets for automotive fuel cell systems and components. To help achieve

58

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

E-Print Network [OSTI]

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications for transportation. Fuel cell systems will have to be cost-competitive with conventional and advanced vehicle it represents, the DOE has established detailed cost targets for automotive fuel cell systems and components

59

ORNL: Low-Cost Direct Bonded Aluminum (DBA) Substrates (Agreement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Direct Bonded Aluminum (DBA) Substrates (Agreement ID:23278) 2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer...

60

Mobile Technology Management - DOE Directives, Delegations, and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

203.2, Mobile Technology Management by Denise Hill Functional areas: Mobile Technology, Information Technology, Information Security The order establishes requirements, assigns...

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

THE EFFECT OF INCREASING TRANSPORTATION COST ON FOREIGN DIRECT INVESTMENT.  

E-Print Network [OSTI]

broader dataset which has already been developed will be expanded to include the dramatic changes in oil prices pre Y2K and post Y2K. It was hypothesized that results will reflect that the cost of transportation will drive investment closer, rather... on regional country choice of investment. Previous research has confirmed this. Specifically, research conducted in Mileski (2000) has proven that key events that have affected the international oil supply has shown shift in locations chosen for investment...

Gressler, Kimberly

2009-06-09T23:59:59.000Z

62

Enforcement Project Management Handbook. Directive (Final)  

SciTech Connect (OSTI)

The publication is a basic reference and training manual to assist EPA Superfund field personnel (Remedial Project Managers and On Scene Coordinators) in planning, negotiating, and managing potentially responsible party (PRP) searches and PRP-lead actions at Superfund sites. It provides an overview of each phase of the Superfund enforcement process and discusses specific roles and responsibilities of the RPM/OSC in the process.

Not Available

1989-07-01T23:59:59.000Z

63

Cost Estimating Guide - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases on γ-Al2O3. |ID#: 19834 Title: CorrelationCostCURRENT

64

TRU Waste Management Program. Cost/schedule optimization analysis  

SciTech Connect (OSTI)

This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.

Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

1985-10-01T23:59:59.000Z

65

Los Alamos Waste Management Cost Estimation Model; Final report: Documentation of waste management process, development of Cost Estimation Model, and model reference manual  

SciTech Connect (OSTI)

This final report completes the Los Alamos Waste Management Cost Estimation Project, and includes the documentation of the waste management processes at Los Alamos National Laboratory (LANL) for hazardous, mixed, low-level radioactive solid and transuranic waste, development of the cost estimation model and a user reference manual. The ultimate goal of this effort was to develop an estimate of the life cycle costs for the aforementioned waste types. The Cost Estimation Model is a tool that can be used to calculate the costs of waste management at LANL for the aforementioned waste types, under several different scenarios. Each waste category at LANL is managed in a separate fashion, according to Department of Energy requirements and state and federal regulations. The cost of the waste management process for each waste category has not previously been well documented. In particular, the costs associated with the handling, treatment and storage of the waste have not been well understood. It is anticipated that greater knowledge of these costs will encourage waste generators at the Laboratory to apply waste minimization techniques to current operations. Expected benefits of waste minimization are a reduction in waste volume, decrease in liability and lower waste management costs.

Matysiak, L.M.; Burns, M.L.

1994-03-01T23:59:59.000Z

66

Energy Management and Cost Analysis (A case study)  

E-Print Network [OSTI]

Abstract — Lighting constitutes a main portion of energy consumption in commercial and industrial sector. The Energy Auditing is the key of the consumption which stabilize the situation of energy crisis by providing the conservation schemes. Any organization so called bulk consumer of electrical energy propose to adopt suitable technology or scheme of energy conservation to minimize the unwanted power shutdown either incidentally or by load shedding. In educational buildings a significant component of the energy used is spent in illuminating the interior of the building. As the energy costs increases, possible efforts are to be done to minimize the energy consumption of lighting installations. This follow three basic directions: new more efficient equipment (lamps, control gear, etc.), utilization of improved lighting design practices, improvements in lighting control systems to avoid energy waste for unoccupied and daylight hours. In this paper an Energy audit has been conducted in the educational Institute to estimate the Energy consumption. In this Energy audit the cost analysis and pay back periods have been calculated by replacing the higher consumption lamps with Energy efficient Lightning. The profit of implementing the energy efficiency measures in buildings are considerable both in terms of energy savings and cost savings.

unknown authors

67

Low-Cost Direct Bonded Aluminum (DBA) Substrates  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe10IO1OP001Long-Term StorageDepartmentSystem forTextileManaged

68

Cost effective waste management through composting in Africa  

SciTech Connect (OSTI)

Highlights: Black-Right-Pointing-Pointer The financial/social/institutional sustainability of waste management in Africa is analysed. Black-Right-Pointing-Pointer This note is a compendium of a study on the potential for GHG control via improved zero waste in Africa. Black-Right-Pointing-Pointer This study provides the framework for Local Authorities for realizing sustained GHG reductions. - Abstract: Greenhouse gas (GHG) emissions per person from urban waste management activities are greater in sub-Saharan African countries than in other developing countries, and are increasing as the population becomes more urbanised. Waste from urban areas across Africa is essentially dumped on the ground and there is little control over the resulting gas emissions. The clean development mechanism (CDM), from the 1997 Kyoto Protocol has been the vehicle to initiate projects to control GHG emissions in Africa. However, very few of these projects have been implemented and properly registered. A much more efficient and cost effective way to control GHG emissions from waste is to stabilise the waste via composting and to use the composted material as a soil improver/organic fertiliser or as a component of growing media. Compost can be produced by open windrow or in-vessel composting plants. This paper shows that passively aerated open windrows constitute an appropriate low-cost option for African countries. However, to provide an usable compost material it is recommended that waste is processed through a materials recovery facility (MRF) before being composted. The paper demonstrates that material and biological treatment (MBT) are viable in Africa where they are funded, e.g. CDM. However, they are unlikely to be instigated unless there is a replacement to the Kyoto Protocol, which ceases for Registration in December 2012.

Couth, R. [CRECHE, Centre for Environmental, Coastal and Hydrological Engineering, Civil Engineering Programme, School of Engineering, University of KwaZulu-Natal, Durban 4041 (South Africa); Trois, C., E-mail: troisc@ukzn.ac.za [CRECHE, Centre for Environmental, Coastal and Hydrological Engineering, Civil Engineering Programme, School of Engineering, University of KwaZulu-Natal, Durban 4041 (South Africa)

2012-12-15T23:59:59.000Z

69

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

Application: 2009 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Application: 2009 Update This report is the third annual update of a...

70

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

10 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2010 Update This report is the fourth annual update of a comprehensive...

71

Improved supplier selection and cost management for globalized automotive production  

E-Print Network [OSTI]

For many manufacturing and automotive companies, traditional sourcing decisions rely on total landed cost models to determine the cheapest supplier. Total landed cost models calculate the cost to purchase a part plus all ...

Franken, Joseph P., II (Joseph Philip)

2012-01-01T23:59:59.000Z

72

Records Management Vice-Chancellor's Directive 1 Records Management Vice-Chancellor's Directive  

E-Print Network [OSTI]

. Version control and change history Appendix 1. UTS Archives Collection Guidelines Appendix 2. Lifecycle Management Program (see section 5.2.4). Records database refers to the enterprise-wide records management database administered by University Records. The current records database is TRIM. #12;Records Management

University of Technology, Sydney

73

Direct costing  

E-Print Network [OSTI]

on? See aooounting profess ion is LLvilel upon whether the yrinoiy3Les oontainel in the oonoeyt are aoeeptab1 e f ox the above purposes . Xt is genemXXg oonoslel that ths 1RQ 8 of lirsot sos'C ing oan be he 1 pfs1 to ~on eat in oontro31ing oosts... withdrew' This emphasis on profit moment has continued& aud it is still of great importanoe. Xt has increased in oomyleaL~ during the time of the decreasing value ef the doKLar~ awk account- ants are 'still striviug i'ox' a more useful and a mors...

Browning, Donald Bullock

1960-01-01T23:59:59.000Z

74

Benefits and costs of load management: a technical assistance and resource material handbook  

SciTech Connect (OSTI)

This handbook will assist state regulatory authorities and electric utilities in complying with the Load Management Standard of the Public Utility Regulatory Policies Act of 1978. The handbook has two major sections. The first discusses load-management techniques in terms of equipment, customer applications, combinations of techniques, etc. Key steps for evaluating the costs and benefits of load management options also are presented. These steps are intended to sequentially eliminate ineffective load-management options as the cost-benefit calculation becomes more detailed. The second section includes up-to-date information on available load-management technologies, models for utility costing, load-management data transfer, prescreening of load-management options, and the load-management literature.

None

1980-06-01T23:59:59.000Z

75

Facilitating Sound, Cost-Effective Federal Energy Management (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet is an overview of the U.S. Department of Energy's Federal Energy Management Program (FEMP).

Not Available

2012-12-01T23:59:59.000Z

76

Supply Chain Management Purchasing, Direct Pay and Travel  

E-Print Network [OSTI]

CBA section can be purchased with a CBA. Signatures Required for Travel (Dean's office policySupply Chain Management Purchasing, Direct Pay and Travel Purchasing ­ all purchases made by the University are governed by policy Note: Four uses of State General Funds are always prohibited: the purchase

77

Comparison of Life Cycle Costs for LLRW Management in Texas  

SciTech Connect (OSTI)

This report documents a comparison of life-cycle costs of an assured isolation facility in Texas versus the life-cycle costs for a traditional belowground low-level radioactive waste disposal facility designed for the proposed site near Sierra Blanca, Texas.

Baird, R. D.; Rogers, B. C.; Chau, N.; Kerr, Thomas A

1999-08-01T23:59:59.000Z

78

Cost-Effective Silicon Wafers for Solar Cells: Direct Wafer Enabling Terawatt Photovoltaics  

SciTech Connect (OSTI)

Broad Funding Opportunity Announcement Project: 1366 is developing a process to reduce the cost of solar electricity by up to 50% by 2020—from $0.15 per kilowatt hour to less than $0.07. 1366’s process avoids the costly step of slicing a large block of silicon crystal into wafers, which turns half the silicon to dust. Instead, the company is producing thin wafers directly from molten silicon at industry-standard sizes, and with efficiencies that compare favorably with today’s state-of-the-art technologies. 1366’s wafers could directly replace wafers currently on the market, so there would be no interruptions to the delivery of these products to market. As a result of 1366’s technology, the cost of silicon wafers could be reduced by 80%.

None

2010-01-15T23:59:59.000Z

79

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2009 Update  

Fuel Cell Technologies Publication and Product Library (EERE)

This report is the third annual update of a comprehensive automotive fuel cell cost analysis. It contains estimates for material and manufacturing cost of complete 80 kWnet direct hydrogen proton exch

80

Mass Production Cost Estimation For Direct H2 PEM Fuel Cell Systesm for Automotive Applications: 2010 Update  

Fuel Cell Technologies Publication and Product Library (EERE)

This report is the fourth annual update of a comprehensive automotive fuel cell cost analysis. It contains estimates for material and manufacturing costs of complete 80 kWnet direct?hydrogen proton ex

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

A Low Cost Energy Management Program at Engelhard Industries Division  

E-Print Network [OSTI]

in technology related to precious metals and nonmetallic minerals. It manufactures high-performance chemical and precious metals products, including catalysts for the petroleum and automotive industries. Engelhard's energy costs have risen dramatically over...

Brown, T. S.; Michalek, R.; Reiter, S.

1982-01-01T23:59:59.000Z

82

An economic analysis of costs of solid waste management in rural Texas communities  

E-Print Network [OSTI]

AN ECONOMIC ANALYSIS OF COSTS OF SOLID WASTE MANAGEMENT IN RURAL TEXAS COMMUNITIES A Thesis by John Patrick Hall Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER... OF SCIENCE December 1973 Major Subject: Agricultural Economics AN ECONOMIC ANALYSIS OF COSTS OF SOLID WASTE MANAGEMENT IN RURAL TEXAS COMMUNITIES A Thesis by John Patrick Hall Approved as to style and content by: hairman of mmi, ttee j ead...

Hall, John Patrick

1973-01-01T23:59:59.000Z

83

On-site vs off-site management of environmental restoration waste: A cost effectiveness analysis  

SciTech Connect (OSTI)

The Sandia National Laboratories Environmental Restoration Project is expected to generate relatively large volumes of hazardous waste as a result of cleanup operations. These volumes will exceed the Laboratories existing waste management capacity. This paper presents four options for managing remediation wastes, including three alternatives for on-site waste management utilizing a corrective action management unit (CAMU). Costs are estimated for each of the four options based on current volumetric estimates of hazardous waste. Cost equations are derived for each of the options with the variables being waste volumes, the major unknowns in the analysis. These equations provide a means to update cost estimates as volume estimates change. This approach may be helpful to others facing similar waste management decisions.

Morse, M.A. [Terradigm, Inc., Albuquerque, NM (United States); Aamodt, P.L. [Los Alamos National Lab., NM (United States); Cox, W.B. [Sandia National Labs., Albuquerque, NM (United States)

1996-02-01T23:59:59.000Z

84

The Texas Cattle Feeding Industry - Operations, Management, and Costs.  

E-Print Network [OSTI]

per pound of gain. The largest decrease in annual fixed costs per pound of gain occurred as feedlot size increased from less than 1,0.0.0. head capacity to 4,0.0.0. head capacity. Results revealed generally more variability in costs among smaller... almost 1,0.50. lb while heifers averaged about 865 lb. Almost 70.% of the fed steers marketed from Texas feedlots graded U.S. Choice or higher compared to 50% for fed heifers. Fed cattle marketed from Panhandle Plains feedlots were predominantly U...

Dietrich, R.A.; Thomas, P.J.; Farris, D.E.

1985-01-01T23:59:59.000Z

85

Summary of the cost analysis report for the long-term management of depleted uranium hexafluoride  

SciTech Connect (OSTI)

This report is a summary of the Cost Analysis Report which provides comparative cost data for the management strategy alternatives. The PEIS and the Cost Analysis Report will help DOE select a management strategy. The Record of Decision, expected in 1998, will complete the first part of the Depleted Uranium Hexafluoride Management Program. The second part of the Program will look at specific sites and technologies for carrying out the selected strategy. The Cost Analysis Report estimates the primary capital and operating costs for the different alternatives. It reflects the costs of technology development construction of facilities, operation, and decontamination and decommissioning. It also includes potential revenues from the sale of by-products such as anhydrous hydrogen fluoride (ABF). These estimates are based on early designs. They are intended to help in comparing alternatives, rather than to indicate absolute costs for project budgets or bidding purposes. More detailed estimates and specific funding sources will be considered in part two of the Depleted Uranium Hexafluoride Management Program.

Dubrin, J.W.; Rahm-Crites, L.

1997-09-01T23:59:59.000Z

86

Using Key Performance Indicators to Manage Energy Costs  

E-Print Network [OSTI]

-effective to collect much more data than ever before, many energy managers find themselves drowning in the volume of data generated. Business information systems faced a similar challenge a decade ago, and it is now common practice to use Key Performance Indicators...

Van Gorp, J. C.

2005-01-01T23:59:59.000Z

87

Rheology and stability kinetics of bare silicon nanoparticle inks for low-cost direct printing  

SciTech Connect (OSTI)

Highly dispersed and stable silicon nanoparticles ink is formulated for its application in direct printing or printable electronics. These dispersions are prepared from free-standing silicon nanoparticles which are not capped with any organic ligand, making it suitable for electronic applications. Silicon nanoparticles dispersions are prepared by suspending the nanoparticles in benzonitrile or ethanol by using polypropylene glycol (PPG) as a binder. All the samples show typical shear thinning behavior while the dispersion samples show low viscosities signifying good quality dispersion. Such thinning behavior favors in fabrication of dense films with spin-coating or patterns with drop casting. The dispersion stability is monitored by turbiscan measurements showing good stability for one week. A low-cost direct printing method for dispersion samples is also demonstrated to obtain micro-sized patterns. Low electrical resistivity of resulting patterns, adjustable viscosity and good stability makes these silicon nanoparticles dispersions highly applicable for direct printing process.

More, Priyesh V.; Jeong, Sunho; Seo, Yeong-Hui; Ryu, Beyong-Hwan; Choi, Youngmin [Advanced Materials Division, Korea Research Institute of Chemical Technology 141 Gajeong-ro, Yuseong-gu, Daejeon 305-600 (Korea, Republic of); Kim, Seong Jip [Advanced Materials Division, Korea Research Institute of Chemical Technology 141 Gajeong-ro, Yuseong-gu, Daejeon 305-600 Korea and Department of Materials Science and Engineering, Korea University 5-1 Anam-Dong, Seongbuk-gu, Seoul 136-701 (Korea, Republic of); Nahm, Sahn [Department of Materials Science and Engineering, Korea University 5-1 Anam-Dong, Seongbuk-gu, Seoul 136-701 (Korea, Republic of)

2013-12-16T23:59:59.000Z

88

Low-Cost Direct Bonded Aluminum (DBA) Substrates | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy Health andofIanJenniferLeslieEnergy LoanOfficialLow-Cost Direct Bonded

89

Material and energy recovery in integrated waste management systems: A life-cycle costing approach  

SciTech Connect (OSTI)

Highlights: > The study aims at assessing economic performance of alternative scenarios of MSW. > The approach is the life-cycle costing (LCC). > Waste technologies must be considered as complementary into an integrated strategy. - Abstract: A critical assumption of studies assessing comparatively waste management options concerns the constant average cost for selective collection regardless the source separation level (SSL) reached, and the neglect of the mass constraint. The present study compares alternative waste management scenarios through the development of a desktop model that tries to remove the above assumption. Several alternative scenarios based on different combinations of energy and materials recovery are applied to two imaginary areas modelled in order to represent a typical Northern Italian setting. External costs and benefits implied by scenarios are also considered. Scenarios are compared on the base of the full cost for treating the total waste generated in the area. The model investigates the factors that influence the relative convenience of alternative scenarios.

Massarutto, Antonio [University of Udine, Udine (Italy); IEFE, Bocconi University, Milan (Italy); Carli, Alessandro de, E-mail: alessandro.decarli@unibocconi.it [IEFE, Bocconi University, Milan (Italy); Graffi, Matteo [University of Udine, Udine (Italy); IEFE, Bocconi University, Milan (Italy)

2011-09-15T23:59:59.000Z

90

The process of life-cycle cost analysis on the Fernald Environmental Management Project  

SciTech Connect (OSTI)

The Estimating Services Department of the Fernald Environmental Restoration Management Corporation (FERMCO) is formalizing the process of life-cycle cost analysis (LCCA) for the Fernald Environmental Management Project (FEMP). The LCCA process is based on the concepts, principles, and guidelines described by applicable Department of Energy`s (DOE) orders, pertinent published literature, and the National Bureau of Standards handbook 135. LCC analyses will be performed following a ten-step process on the FEMP at the earliest possible decision point to support the selection of the least-cost alternatives for achieving the FERMCO mission.

Chang, D.Y.; Jacoboski, J.A.; Fisher, L.A.; Beirne, P.J.

1993-10-07T23:59:59.000Z

91

Financial sustainability in municipal solid waste managementCosts and revenues in Bahir Dar, Ethiopia  

SciTech Connect (OSTI)

Highlights: • Cost-revenue analysis over 2 years revealed insufficient cost-recovery. • Expenses for motorized secondary collection increased by 82% over two years. • Low fee collection rate and reliance on only one revenue stream are problematic. • Different options for cost reduction and enhanced revenue streams are recommended. • Good public–private alliance is crucial to plan and implement improvement measures. - Abstract: Providing good solid waste management (SWM) services while also ensuring financial sustainability of the system continues to be a major challenge in cities of developing countries. Bahir Dar in northwestern Ethiopia outsourced municipal waste services to a private waste company in 2008. While this institutional change has led to substantial improvement in the cleanliness of the city, its financial sustainability remains unclear. Is the private company able to generate sufficient revenues from their activities to offset the costs and generate some profit? This paper presents a cost-revenue analysis, based on data from July 2009 to June 2011. The analysis reveals that overall costs in Bahir Dar’s SWM system increased significantly during this period, mainly due to rising costs related to waste transportation. On the other hand, there is only one major revenue stream in place: the waste collection fee from households, commercial enterprises and institutions. As the efficiency of fee collection from households is only around 50%, the total amount of revenues are not sufficient to cover the running costs. This results in a substantial yearly deficit. The results of the research therefore show that a more detailed cost structure and cost-revenue analysis of this waste management service is important with appropriate measures, either by the privates sector itself or with the support of the local authorities, in order to enhance cost efficiency and balance the cost-revenues towards cost recovery. Delays in mitigating the evident financial deficit could else endanger the public-private partnership (PPP) and lead to failure of this setup in the medium to long term, thus also endangering the now existing improved and currently reliable service. We present four options on how financial sustainability of the SWM system in Bahir Dar might be enhanced: (i) improved fee collection efficiency by linking the fees of solid waste collection to water supply; (ii) increasing the value chain by sales of organic waste recycling products; (iii) diversifying revenue streams and financing mechanisms (polluter-pays-, cross-subsidy- and business-principles); and (iv) cost reduction and improved cost-effectiveness. We argue that in a PPP setup such as in Bahir Dar, a strong alliance between the municipality and private enterprise is important so that appropriate solutions for improved financial sustainability of a SWM system can be sought and implemented.

Lohri, Christian Riuji, E-mail: christian.lohri@eawag.ch; Camenzind, Ephraim Joseph, E-mail: ephraimcamenzind@hotmail.com; Zurbrügg, Christian, E-mail: christian.zurbruegg@eawag.ch

2014-02-15T23:59:59.000Z

92

Managing the Cost, Energy Consumption, and Carbon Footprint of Internet Services  

E-Print Network [OSTI]

Managing the Cost, Energy Consumption, and Carbon Footprint of Internet Services Kien Le , Ozlem electricity consumptions translate into large carbon footprints, since most of the electricity in the US such as government imposed Kyoto- style carbon limits. Extensive simulations and real experiments show that our

Martonosi, Margaret

93

Enterprise Risk Management (ERM) Model - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Enterprise Risk Management (ERM) Model by Website Administrator The Enterprise Risk Management Model is a new standardized framework that the Department will be using to develop,...

94

Measuring Property Management Risk and Loss: Step One Toward Managing Property on a Foundation of Risk, Cost, and Benefit  

SciTech Connect (OSTI)

This is a period of ever-tightening defense budgets and continuing pressure on the public sector to be more commercial-like, Property policies, practices, and regulations are increasingly being challenged and changed. In these times, we must be leaders in understanding and defining the value of our profession from a commercial standpoint so that we can provide the right services to our customers and explain and defend the value of those services. To do so, we must step outside current property management practices, regulations, and oversight. We must learn to think and speak in the language of those who fund us--a financial language of risk, cost, and benefit. Regardless of regulation and oversight, our bosses are demanding that we demonstrate (financially) the benefits of current practice, or else. This article is intended to be the beginning of an effort to understand and define our profession in terms of risk, cost, and benefit so that we can meet these new challenges. The first step in this effort must be defining and measuring risk, cost, and benefit. Our costs, although sometimes difficult to capture, are easy to understand: they are almost exclusively the effort, both within and without the property management organization, involved in managing property. Unfortunately, property risks and benefits are not so simple or so well understood. Generally, risks and benefits are identified and measured through physical inventory results: potential and actual shortages. This paper will explore the weaknesses in the current understanding and use of shortage information as the yardstick for property management risks and performance. It will define a new framework for understanding the purpose and value of property management. And finally, it will set a course for a new method of measuring and valuing physical inventoty shortages. This new method will yield accurate and useful measures of property management risk and benefit. Once risk and benefit are accurately understood and measured, it will be possible to evaluate, adjust, and explain property management practices and regulations from a commercial, financial perspective; it will be possible for us to be the leaders in redefining the purpose and value of the property management profession for today's environment.

Johnson, Curtis

1999-05-17T23:59:59.000Z

95

Performance and cost models for the direct sulfur recovery process. Task 1 Topical report, Volume 3  

SciTech Connect (OSTI)

The purpose of this project is to develop performance and cost models of the Direct Sulfur Recovery Process (DSRP). The DSRP is an emerging technology for sulfur recovery from advanced power generation technologies such as Integrated Gasification Combined Cycle (IGCC) systems. In IGCC systems, sulfur present in the coal is captured by gas cleanup technologies to avoid creating emissions of sulfur dioxide to the atmosphere. The sulfur that is separated from the coal gas stream must be collected. Leading options for dealing with the sulfur include byproduct recovery as either sulfur or sulfuric acid. Sulfur is a preferred byproduct, because it is easier to handle and therefore does not depend as strongly upon the location of potential customers as is the case for sulfuric acid. This report describes the need for new sulfur recovery technologies.

Frey, H.C. [North Carolina State Univ., Raleigh, NC (United States); Williams, R.B. [Carneigie Mellon Univ., Pittsburgh, PA (United States)

1995-09-01T23:59:59.000Z

96

Energy Efficiency Improvement and Cost Saving Opportunities for the Pharmaceutical Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

the effects of low refrigerant charge. The cost of automatedby applying this measure. Monitoring of refrigerant charge.A low refrigerant charge can exist in many small direct

Galitsky, Christina

2008-01-01T23:59:59.000Z

97

Cost estimates for near-term depolyment of advanced traffic management systems. Final report  

SciTech Connect (OSTI)

The objective of this study is to provide cost est engineering, design, installation, operation and maintenance of Advanced Traffic Management Systems (ATMS) in the largest 75 metropolitan areas in the United States. This report gives estimates for deployment costs for ATMS in the next five years, subject to the qualifications and caveats set out in following paragraphs. The report considers infrastructure components required to realize fully a functional ATMS over each of two highway networks (as discussed in the Section describing our general assumptions) under each of the four architectures identified in the MITRE Intelligent Vehicle Highway Systems (IVHS) Architecture studies. The architectures are summarized in this report in Table 2. Estimates are given for eight combinations of highway networks and architectures. We estimate that it will cost between $8.5 Billion (minimal network) and $26 Billion (augmented network) to proceed immediately with deployment of ATMS in the largest 75 metropolitan areas. Costs are given in 1992 dollars, and are not adjusted for future inflation. Our estimates are based partially on completed project costs, which have been adjusted to 1992 dollars. We assume that a particular architecture will be chosen; projected costs are broken by architecture.

Stevens, S.S.; Chin, S.M.

1993-02-15T23:59:59.000Z

98

COMPLETELY DC-FREE DIRECT SEQUENCE SPECTRUM SPREADING SCHEME FOR LOW POWER, LOW COST, DIRECT CONVERSION TRANSCEIVER  

E-Print Network [OSTI]

call the offset code spreading scheme. By employing the scheme, we can implement a direct- conversion- level design. The direct conversion receiver architecture combined with D-BPSK (differential, there are some design problems. In a direct conversion receiver, DC offset due to carrier leakage and 1/f mixer

Lee, Thomas H.

99

Energy Management System Lowers U.S. Navy Energy Costs Through PV System Interconnection (Fact Sheet)  

SciTech Connect (OSTI)

To meet the U.S. Navy's energy goals, the National Renewable Energy Laboratory (NREL) and the Naval Facilities Engineering Command (NAVFAC) spent two years collaborating on demonstrations that tested market-ready energy efficiency measures, renewable energy generation, and energy systems integration. One such technology - an energy management system - was identified as a promising method for reducing energy use and costs, and can contribute to increasing energy security.

Not Available

2014-04-01T23:59:59.000Z

100

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

technology * 2015 projected technology 2 Determine costs for these 3 tech level Fuel Cell System Battery System Storage 2. Determine costs for these 3 tech level systems at 5...

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Direct and Indirect Impacts of Weed Management Practices on Soil Quality  

E-Print Network [OSTI]

: although effective weed management and enhancement of soil quality are necessary components of sustainable275 18 Direct and Indirect Impacts of Weed Management Practices on Soil Quality Richard G. Smith, crop yield, and agricultural sustainability (Kar- len et al., 2001), the impact that weed management

Maxwell, Bruce D.

102

Applications of life cycle assessment and cost analysis in health care waste management  

SciTech Connect (OSTI)

Highlights: Black-Right-Pointing-Pointer Three Health Care Waste (HCW) scenarios were assessed through environmental and cost analysis. Black-Right-Pointing-Pointer HCW treatment using microwave oven had the lowest environmental impacts and costs in comparison with autoclave and lime. Black-Right-Pointing-Pointer Lime had the worst environmental and economic results for HCW treatment, in comparison with autoclave and microwave. - Abstract: The establishment of rules to manage Health Care Waste (HCW) is a challenge for the public sector. Regulatory agencies must ensure the safety of waste management alternatives for two very different profiles of generators: (1) hospitals, which concentrate the production of HCW and (2) small establishments, such as clinics, pharmacies and other sources, that generate dispersed quantities of HCW and are scattered throughout the city. To assist in developing sector regulations for the small generators, we evaluated three management scenarios using decision-making tools. They consisted of a disinfection technique (microwave, autoclave and lime) followed by landfilling, where transportation was also included. The microwave, autoclave and lime techniques were tested at the laboratory to establish the operating parameters to ensure their efficiency in disinfection. Using a life cycle assessment (LCA) and cost analysis, the decision-making tools aimed to determine the technique with the best environmental performance. This consisted of evaluating the eco-efficiency of each scenario. Based on the life cycle assessment, microwaving had the lowest environmental impact (12.64 Pt) followed by autoclaving (48.46 Pt). The cost analyses indicated values of US$ 0.12 kg{sup -1} for the waste treated with microwaves, US$ 1.10 kg{sup -1} for the waste treated by the autoclave and US$ 1.53 kg{sup -1} for the waste treated with lime. The microwave disinfection presented the best eco-efficiency performance among those studied and provided a feasible alternative to subsidize the formulation of the policy for small generators of HCW.

Soares, Sebastiao Roberto, E-mail: soares@ens.ufsc.br [Department of Sanitary Engineering, Federal University of Santa Catarina, UFSC, Campus Universitario, Centro Tecnologico, Trindade, PO Box 476, Florianopolis, SC 88040-970 (Brazil); Finotti, Alexandra Rodrigues, E-mail: finotti@ens.ufsc.br [Department of Sanitary Engineering, Federal University of Santa Catarina, UFSC, Campus Universitario, Centro Tecnologico, Trindade, PO Box 476, Florianopolis, SC 88040-970 (Brazil); Prudencio da Silva, Vamilson, E-mail: vamilson@epagri.sc.gov.br [Department of Sanitary Engineering, Federal University of Santa Catarina, UFSC, Campus Universitario, Centro Tecnologico, Trindade, PO Box 476, Florianopolis, SC 88040-970 (Brazil); EPAGRI, Rod. Admar Gonzaga 1347, Itacorubi, Florianopolis, Santa Catarina 88034-901 (Brazil); Alvarenga, Rodrigo A.F., E-mail: alvarenga.raf@gmail.com [Department of Sanitary Engineering, Federal University of Santa Catarina, UFSC, Campus Universitario, Centro Tecnologico, Trindade, PO Box 476, Florianopolis, SC 88040-970 (Brazil); Ghent University, Department of Sustainable Organic Chemistry and Technology, Coupure Links 653/9000 Gent (Belgium)

2013-01-15T23:59:59.000Z

103

Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543  

SciTech Connect (OSTI)

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

Larsson, Arne; Lidar, Per [Studsvik Nuclear AB, SE-611 82 Nykoeping (Sweden)] [Studsvik Nuclear AB, SE-611 82 Nykoeping (Sweden); Bergh, Niklas; Hedin, Gunnar [Westinghouse Electric Sweden AB, Fredholmsgatan 2, SE-721 63, Vaesteraas (Sweden)] [Westinghouse Electric Sweden AB, Fredholmsgatan 2, SE-721 63, Vaesteraas (Sweden)

2013-07-01T23:59:59.000Z

104

A direct thin-film path towards low-cost large-area III-V photovoltaics  

E-Print Network [OSTI]

A direct thin-film path towards low-cost large-area III-V photovoltaics Rehan Kapadia1,2 *, Zhibin-V photovoltaics (PVs) have demonstrated the highest power conversion efficiencies for both single- and multi times, and large equipment investments restrict applications to concentrated and space photovoltaics

California at Irvine, University of

105

Estimating Methods - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

direct costs, and other estimating considerations are discussed in this chapter. g4301-1chp15.pdf -- PDF Document, 28 KB Writer: John Makepeace Subjects: Administration Management...

106

MANAGED OBJECT PATTERN Class Behavioral Provide direct control of individual resources in a managed system. The Managed Object  

E-Print Network [OSTI]

in a managed system. The Managed Object provides a one-to-one mapping to the manageable entities, as well system, in which case the Manager-Agent pattern might be more appropriate). #12;2 / 4 Structure management systems to learn about the contents of the MIB. · Managed Object - Represents a single resource

Keller, Rudolf K.

107

Forest Ecology and Management 260 (2010) 4251 Contents lists available at ScienceDirect  

E-Print Network [OSTI]

Forest Ecology and Management 260 (2010) 42­51 Contents lists available at ScienceDirect Forest concern, while at both site and landscape levels, woodland was associated with a higher percent of area

108

Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-CostManufacturingMarginalMarket|

109

Operating Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

110

US Spent (Used) Fuel Status, Management and Likely Directions- 12522  

SciTech Connect (OSTI)

As of 2010, the US has accumulated 65,200 MTU (42,300 MTU of PWR's; 23,000 MTU of BWR's) of spent (irradiated or used) fuel from 104 operating commercial nuclear power plants situated at 65 sites in 31 States and from previously shutdown commercial nuclear power plants. Further, the Department of Energy (DOE) has responsibility for an additional 2458 MTU of DOE-owned defense and non defense spent fuel from naval nuclear power reactors, various non-commercial test reactors and reactor demonstrations. The US has no centralized large spent fuel storage facility for either commercial spent fuel or DOE-owned spent fuel. The 65,200 MTU of US spent fuel is being safely stored by US utilities at numerous reactor sites in (wet) pools or (dry) metal or concrete casks. As of November 2010, the US had 63 'independent spent fuel storage installations' (or ISFSI's) licensed by the US Nuclear Regulatory Commission located at 57 sites in 33 states. Over 1400 casks loaded with spent fuel for dry storage are at these licensed ISFSI's; 47 sites are located at commercial reactor sites and 10 are located 'away' from a reactor (AFR's) site. DOE's small fraction of a 2458 MTU spent fuel inventory, which is not commercial spent fuel, is with the exception of 2 MTU, being stored at 4 sites in 4 States. The decades old US policy of a 'once through' fuel cycle with no recycle of spent fuel was set into a state of 'mass confusion or disruption' when the new US President Obama's administration started in early 2010 stopping the only US geologic disposal repository at the Yucca Mountain site in the State of Nevada from being developed and licensed. The practical result is that US nuclear power plant operators will have to continue to be responsible for managing and storing their own spent fuel for an indefinite period of time at many different sites in order to continue to generate electricity because there is no current US government plan, schedule or policy for taking possession of accumulated spent fuel from the utilities. There are technical solutions for continuing the safe storage of spent fuel for 100 years or more and these solutions will be implemented by the US utilities that need to keep their nuclear power plants operating while the unknown political events are played out to establish future US policy decisions that can remain in place long enough regarding accumulated spent fuel inventories to implement any new US spent fuel centralized storage or disposition policy by the US government. (author)

Jardine, Leslie J. [L. J. Jardine Services, Consultant, Dublin CA, 94568 (United States)

2012-07-01T23:59:59.000Z

111

Minimization of Cost, Sediment Load, and Sensitivity to Climate Change in a Watershed Management Application  

E-Print Network [OSTI]

caused by non-point source impacts from developed lands, structural Best Management Practices (BMPs management practice (BMP) plans for entire watersheds. Each of these alternative BMP configurations are non: multiobjective, differential evolution, robustness to uncertainty, stormwater management, best management

Eppstein, Margaret J.

112

50 IEEE TRANSACTIONS ON SMART GRID, VOL. 3, NO. 1, MARCH 2012 Coordinated Energy Cost Management of Distributed  

E-Print Network [OSTI]

of Electrical and Computer Engineering, Texas A&M University, College Station, USA (e-mail: lxie, and Wenyu Liu, Member, IEEE Abstract--This paper addresses the problem of electricity cost management on Internet services drastically increases in recent years, the electricity con- sumed by Internet data

113

Measuring the Costs and Economic, Social, and Environmental Benefits of Nationwide Geothermal Heat Pump Deployment and The Potential Employment, Energy, and Environmental Impacts of Direct Use Applications  

Broader source: Energy.gov [DOE]

Project objectives: To measure the costs and economic; social; and environmental benefits of nationwide geothermal heat pump (GHP) deployment; and To survey selected states as to their potential employment; energy use and savings; and environmental impact for direct use applications.

114

Minimization of cost, sediment load, and sensitivity to climate change in a watershed management application  

E-Print Network [OSTI]

: Multiobjective Differential evolution Robustness to uncertainty Stormwater management Best management practices-scale, multiobjective framework for generating a diverse family of stormwater best management practice (BMP) plans-point source impacts from developed lands, structural Best Management Practices (BMPs) such as detention ponds

Eppstein, Margaret J.

115

Factors influencing landowner willingness to enroll in a cost-share brush management program in the Pedernales River watershed, Texas  

E-Print Network [OSTI]

FACTORS INFLUENCING LANDOWNER WILLINGNESS TO ENROLL IN A COST-SHARE BRUSH MANAGEMENT PROGRAM IN THE PEDERNALES RIVER WATERSHED, TEXAS A Thesis by MARK ROBERT TAYS Submitted to the Office of Graduate Studies of Texas ARM University in partial... WATERSHED, TEXAS A Thesis by MARK ROBERT TAYS Submitted to the Oftice of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE Approved as to style and content by: Urs P. Kreuter...

Tays, Mark Robert

2001-01-01T23:59:59.000Z

116

COORDINATING HUMAN AND MATERIAL RESOURCES Construction project management is the art of directing and coordinating human and material  

E-Print Network [OSTI]

COORDINATING HUMAN AND MATERIAL RESOURCES Construction project management is the art of directing and coordinating human and material resources throughout the life of a project by using modern management. Today's construction engineers and managers are faced with unprecedented challenges in planning

Simaan, Nabil

117

Light-Weight, Low-Cost, Single-Phase, Liquid-Cooled Cold Plate (Presentation)  

SciTech Connect (OSTI)

This presentation, 'Light-Weight, Low-Cost, Single-Phase Liquid-Cooled Cold Plate,' directly addresses program goals of increased power density, specific power, and lower cost of power electronics components through improved thermal management.

Narumanchi, S.

2013-07-01T23:59:59.000Z

118

Directions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directions Where We Are Directions The Bradbury Science Museum is located at 1350 Central Avenue Los Alamos, NM 87544 Los Alamos (elevation 7,355 feet) is perched high atop the...

119

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update  

Fuel Cell Technologies Publication and Product Library (EERE)

This report estimates fuel cell system cost for systems produced in the years 2007, 2010, and 2015, and is the first annual update of a comprehensive automotive fuel cell cost analysis.

120

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2008 Update  

Fuel Cell Technologies Publication and Product Library (EERE)

This report estimates fuel cell system cost for systems produced in the years 2006, 2010, and 2015, and is the second annual update of a comprehensive automotive fuel cell cost analysis.

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2008 Update  

Broader source: Energy.gov [DOE]

Report estimates fuel cell system cost for systems produced in the years 2006, 2010, and 2015, and is the second annual update of a comprehensive automotive fuel cell cost analysis.

122

DFMA Cost Estimates of Fuel-Cell/Reformer Systems  

E-Print Network [OSTI]

Page 1 DFMA Cost Estimates of Fuel-Cell/Reformer Systems at Low/Medium/High Production Rates Brian system · Direct hydrogen fuel cell system (with 5kpsi H2 storage) 2. Determine costs for system ·Fuel cell stacks ·Air supply and humidification ·Thermal management ·Water management ·Fuel Supply

123

Changes in Flood Management along the Pajaro River: A Transition to Watershed Management Approaches and Lessons from the Water Framework Directive and Flood Directive  

E-Print Network [OSTI]

human actions causing environmental damage and the full-costand include the environmental damage and recovery costs (

Jagger, Stacie

2009-01-01T23:59:59.000Z

124

SDSU RESEARCH FOUNDATION COST SHARING POLICY AND PROCEDURES The purpose of these guidelines is to provide direction in accumulating and reporting cost  

E-Print Network [OSTI]

SDSU RESEARCH FOUNDATION COST SHARING POLICY AND PROCEDURES PURPOSE The purpose of these guidelines represent the recipient's (that is, SDSU, the Campanile Foundation, or SDSU Research Foundation) cash outlay and/or non-Federal third parties. POLICY: It is the policy of the Foundation and the University

Ponce, V. Miguel

125

Energy Efficiency Improvement and Cost Saving Opportunities for the Glass Industry. An ENERGY STAR Guide for Energy and Plant Managers  

SciTech Connect (OSTI)

The U.S. glass industry is comprised of four primary industry segments--flat glass, container glass, specialty glass, and fiberglass--which together consume $1.6 billion in energy annually. On average, energy costs in the U.S. glass industry account for around 14 percent of total glass production costs. Energy efficiency improvement is an important way to reduce these costs and to increase predictable earnings, especially in times of high energy price volatility. There is a variety of opportunities available at individual plants in the U.S. glass industry to reduce energy consumption in a cost-effective manner. This Energy Guide discusses energy efficiency practices and energy-efficient technologies that can be implemented at the component, process, system, and organizational levels. A discussion of the trends, structure, and energy consumption characteristics of the U.S. glass industry is provided along with a description of the major process steps in glass manufacturing. Expected savings in energy and energy-related costs are given for many energy efficiency measures, based on case study data from real-world applications in glass production facilities and related industries worldwide. Typical measure payback periods and references to further information in the technical literature are also provided, when available. The information in this Energy Guide is intended to help energy and plant managers in the U.S. glass industry reduce energy consumption in a cost-effective manner while maintaining the quality of products manufactured. Further research on the economics of the measures--as well on as their applicability to different production practices--is needed to assess potential implementation of selected technologies at individual plants.

Galitsky, Christina; Worrell, Ernst; Galitsky, Christina; Masanet, Eric; Graus, Wina

2008-03-01T23:59:59.000Z

126

Energy Efficiency Improvement and Cost Saving Opportunities for the Pharmaceutical Industry. An ENERGY STAR Guide for Energy and Plant Managers  

SciTech Connect (OSTI)

The U.S. pharmaceutical industry consumes almost $1 billion in energy annually. Energy efficiency improvement is an important way to reduce these costs and to increase predictable earnings, especially in times of high energy price volatility. There are a variety of opportunities available at individual plants in the U.S. pharmaceutical industry to reduce energy consumption in a cost-effective manner. This Energy Guide discusses energy efficiency practices and energy efficient technologies that can be implemented at the component, process, system, and organizational levels. A discussion of the trends, structure, and energy consumption characteristics of the U.S. pharmaceutical industry is provided along with a description of the major process steps in the pharmaceutical manufacturing process. Expected savings in energy and energy-related costs are given for many energy efficiency measures, based on case study data from real-world applications in pharmaceutical and related facilities worldwide. Typical measure payback periods and references to further information in the technical literature are also provided, when available. The information in this Energy Guide is intended to help energy and plant managers reduce energy consumption in a cost-effective manner while meeting regulatory requirements and maintaining the quality of products manufactured. At individual plants, further research on the economics of the measures?as well as their applicability to different production practices?is needed to assess potential implementation of selected technologies.

Galitsky, Christina; Galitsky, Christina; Chang, Sheng-chieh; Worrell, Ernst; Masanet, Eric

2008-03-01T23:59:59.000Z

127

Managing the cost of emissions for durable, carbon-containing products  

SciTech Connect (OSTI)

We recognize that carbon-containing products do not decay and release CO2 to the atmosphere instantaneously, but release that carbon over extended periods of time. For an initial production of a stock of carbon-containing product, we can treat the release as a probability distribution covering the time over which that release occurs. The probability distribution that models the carbon release predicts the amount of carbon that is released as a function of time. The use of a probability distribution in accounting for the release of carbon to the atmosphere realizes a fundamental shift from the idea that all carbon-containing products contribute to a single pool that decays in proportion to the size of the stock. Viewing the release of carbon as a continuous probabilistic process introduces some theoretical opportunities not available in the former paradigm by taking advantage of other fields where the use of probability distributions has been prevalent for many decades. In particular, theories developed in the life insurance industry can guide the development of pricing and payment structures for dealing with the costs associated with the oxidation and release of carbon. These costs can arise from a number of proposed policies (cap and trade, carbon tax, social cost of carbon, etc), but in the end they all result in there being a cost to releasing carbon to the atmosphere. If there is a cost to the emitter for CO2 emissions, payment for that cost will depend on both when the emissions actually occur and how payment is made. Here we outline some of the pricing and payment structures that are possible which result from analogous theories in the life insurance industry. This development not only provides useful constructs for valuing sequestered carbon, but highlights additional motivations for employing a probability distribution approach to unify accounting methodologies for stocks of carbon containing products.

Shirley, Kevin [Appalachian State University; Marland, Eric [Appalachian State University; Cantrell, Jenna [Appalachian State University; Marland, Gregg [ORNL

2011-03-01T23:59:59.000Z

128

A cost/benefit model for insertion of technological innovation into a total quality management program  

E-Print Network [OSTI]

This study provides economic justification for insertion of technological innovation into a total quality management (TQM) program in a remanufacturing environment. One of the core principles of TQM is continuous improvement. A preferred metric...

Ratliff, William L

1997-01-01T23:59:59.000Z

129

Waste management facilities cost information for transportation of radioactive and hazardous materials  

SciTech Connect (OSTI)

This report contains cost information on the U.S. Department of Energy (DOE) Complex waste streams that will be addressed by DOE in the programmatic environmental impact statement (PEIS) project. It describes the results of the task commissioned by DOE to develop cost information for transportation of radioactive and hazardous waste. It contains transportation costs for most types of DOE waste streams: low-level waste (LLW), mixed low-level waste (MLLW), alpha LLW and alpha MLLW, Greater-Than-Class C (GTCC) LLW and DOE equivalent waste, transuranic (TRU) waste, spent nuclear fuel (SNF), and hazardous waste. Unit rates for transportation of contact-handled (<200 mrem/hr contact dose) and remote-handled (>200 mrem/hr contact dose) radioactive waste are estimated. Land transportation of radioactive and hazardous waste is subject to regulations promulgated by DOE, the U.S. Department of Transportation (DOT), the U.S. Nuclear Regulatory Commission (NRC), and state and local agencies. The cost estimates in this report assume compliance with applicable regulations.

Feizollahi, F.; Shropshire, D.; Burton, D.

1995-06-01T23:59:59.000Z

130

A Comparison of Maintenance Cost, Labor Demands, and System Performance for LID and Conventional Stormwater Management  

E-Print Network [OSTI]

operations and maintenance. Due to increasing requirements for more effective treatment of runoff, and a subsurface gravel wetland, to $11-$21 per kg/yr TSS removed for a wet pond, a dry pond, and a sand filter maintenance burdens (as measured by cost and personnel hours) and higher water quality treatment capabilities

131

Minimizing Energy Costs Through Water Management in the Pulp and Paper Industry  

E-Print Network [OSTI]

The quantity of steam required by a pulp and paper mill, as well as the quantity of power generated can effectively be optimized by managing the water cycles in the mill. This approach addresses the process systems within the mill and investigates...

Wilson, P. H.

132

Managing the Cost, Energy Consumption, and Carbon Footprint of Internet Services  

E-Print Network [OSTI]

or "green" energy. This paper introduces a general, optimization-based framework for enabling multi-data-center services to manage their brown en- ergy consumption and leverage green energy, while respecting their SLAs. "green" or renewable energy.) We argue that placing caps on the brown energy consumption of data centers

Bianchini, Ricardo

133

Energy Efficiency Improvement and Cost Saving Opportunities for Cement Making. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

strategic energy management programin a strategic energy management program are depicted inof a strategic energy management program A successful

Worrell, Ernst

2008-01-01T23:59:59.000Z

134

Aeronautical System Center's environmental compliance assessment and management program's cost-saving initiatives support the Air Force's acquisition reform initiative  

SciTech Connect (OSTI)

The Environmental Management directorate of ASC (ASC/EM) has the responsibility of providing government oversight for the Government Owned Contractor Operated Aircraft and Missile plants (GOCOs). This oversight is manifested as a landlord role where Air Force provides the funding required to maintain the plant facilities including buildings and utilities as well as environmental systems. By agreement the companies operating the plants are required to operate them in accordance with environmental law. Presently the GOCOs include Air Force Plant (AFP) 6 in Marietta Ga., AFP 4 in Fort Worth, Tx., AFP 44 in Tucson, Az., AFP 42 in Palmdale, Ca., and AFP PJKS in Denver, Co. Lockheed Martin corporation operates AFPs 4,6, PJKS and a portion of AFP 42 while AFP 44 is operated by Raytheon Missile Systems Company. Other GOCOs at AFP 42 are Northrup-Grumman, Boeing, and Cabaco, the facilities engineer. Since 1992 the Environmental Management division has conducted its Environmental Compliance Assessment and Management Program assessments (ECAMP) annually at each of the plants. Using DOD's ECAMP Team Guide and teams comprised of both Air Force and consultant engineering personnel, each plant is assessed for its environmental compliance well being. In the face of rising operational costs and diminishing budgets ASC/EM performed a comprehensive review of its ECAMP. As a result, the basic ECAMP program was improved to reduce costs without compromising on quality of the effort. The program retained its emphasis in providing a snap-shot evaluation of each Air Force plant's environmental compliance health supported by complete but tailored protocol assessments.

Meanor, T.

1999-07-01T23:59:59.000Z

135

Energy Efficiency Improvement and Cost Saving Opportunities for Cement Making. An ENERGY STAR Guide for Energy and Plant Managers  

SciTech Connect (OSTI)

The cost of energy as part of the total production costs in the cement industry is significant, warranting attention for energy efficiency to improve the bottom line. Historically, energy intensity has declined, although more recently energy intensity seems to have stabilized with the gains. Coal and coke are currently the primary fuels for the sector, supplanting the dominance of natural gas in the 1970s. Most recently, there is a slight increase in the use of waste fuels, including tires. Between 1970 and 1999, primary physical energy intensity for cement production dropped 1 percent/year from 7.3 MBtu/short ton to 5.3 MBtu/short ton. Carbon dioxide intensity due to fuel consumption and raw material calcination dropped 16 percent, from 609 lb. C/ton of cement (0.31 tC/tonne) to 510 lb. C/ton cement (0.26 tC/tonne). Despite the historic progress, there is ample room for energy efficiency improvement. The relatively high share of wet-process plants (25 percent of clinker production in 1999 in the U.S.) suggests the existence of a considerable potential, when compared to other industrialized countries. We examined over 40 energy efficient technologies and measures and estimated energy savings, carbon dioxide savings, investment costs, and operation and maintenance costs for each of the measures. The report describes the measures and experiences of cement plants around the wold with these practices and technologies. Substantial potential for energy efficiency improvement exists in the cement industry and in individual plants. A portion of this potential will be achieved as part of (natural) modernization and expansion of existing facilities, as well as construction of new plants in particular regions. Still, a relatively large potential for improved energy management practices exists.

Galitsky, Christina; Worrell, Ernst; Galitsky, Christina

2008-01-01T23:59:59.000Z

136

Low cost fuel cell diffusion layer configured for optimized anode water management  

DOE Patents [OSTI]

A fuel cell comprises a cathode gas diffusion layer, a cathode catalyst layer, an anode gas diffusion layer, an anode catalyst layer and an electrolyte. The diffusion resistance of the anode gas diffusion layer when operated with anode fuel is higher than the diffusion resistance of the cathode gas diffusion layer. The anode gas diffusion layer may comprise filler particles having in-plane platelet geometries and be made of lower cost materials and manufacturing processes than currently available commercial carbon fiber substrates. The diffusion resistance difference between the anode gas diffusion layer and the cathode gas diffusion layer may allow for passive water balance control.

Owejan, Jon P; Nicotera, Paul D; Mench, Matthew M; Evans, Robert E

2013-08-27T23:59:59.000Z

137

SPECIAL REPORT Incurred Cost Audit Coverage of Non- Management and Operating Contractors  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September2-SCORECARD-01-24-13 Page 1 of 1 ThisApril 2, 2015Incurred Cost

138

Direct  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phasesData FilesShape,PhysicsDileepDirac Charge Dynamcs inDirect

139

Rangeland Resource Management for Texans: Total Resource Management  

E-Print Network [OSTI]

The Total Resource Management approach helps ranchers make strategic, tactical and operational decisions for the best, most cost-effective use of resources. This publication offers step-by-step directions for implementing TRM for a profitable...

Hanselka, C. Wayne; Fox, William E.; White, Larry D.

2004-03-26T23:59:59.000Z

140

Low-cost, highly efficient, and tunable ultrafast laser technology based on directly diode-pumped Cr:Colquiriites  

E-Print Network [OSTI]

This doctoral project aims to develop robust, ultra low-cost ($5,000-20,000), highly-efficient, and tunable femtosecond laser technology based on diode-pumped Cr:Colquiriite gain media (Cr:LiCAF, Cr3+:LiSAF and Cr:LiSGaF). ...

Demirbas, Umit

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Hot Issue and Burning Options in Waste Management: A Social Cost Benefit Analysis of Waste-to-Energy in the UK.  

E-Print Network [OSTI]

(Miranda and Hale, 1997). 20 4.3 External Costs and Benefits WtE plants emit some pollutants, which include sulphur dioxide, lead, and dioxins which are linked with damage to health and the environment if they occur in high enough concentrations... Hot Issue and Burning Options in Waste Management: A Social Cost Benefit Analysis of Waste-to-Energy in the UK Tooraj Jamasb* Faculty of Economics, University of Cambridge Hande Kiamil Faculty of Economics, University of Cambridge...

Jamasb, Tooraj; Kiamil, H; Nepal, R

142

Energy Efficiency Improvement and Cost Saving Opportunities for Cement Making. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

Technology and Energy Management” Zement-Kalk-Gips 47 : 630-and Bezant, K.W. , 1990. “Energy Management in the UK Cementpotential for improved energy management practices exists.

Worrell, Ernst

2008-01-01T23:59:59.000Z

143

Energy Efficiency Improvement and Cost Saving Opportunities for the Glass Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

actions, develop an energy management plan for business; and38. Caffal, C. (1995). Energy Management in Industry. Centre2005a). Guidelines for Energy Management. United States

Worrell, Ernst

2008-01-01T23:59:59.000Z

144

Energy Efficiency Improvement and Cost Saving Opportunities for the Pharmaceutical Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

2005). Guidelines for Energy Management. Washington, D.C.Caffal, C. (1995). Energy Management in Industry. Centre forfor improving your energy management practices. Resources

Galitsky, Christina

2008-01-01T23:59:59.000Z

145

Energy Efficiency Improvement and Cost Saving Opportunities for the Pharmaceutical Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

in a strategic energy management program are depicted inelements of a strategic energy management program. Energyfocused and strategic energy management program will help to

Galitsky, Christina

2008-01-01T23:59:59.000Z

146

Energy Efficiency Improvement and Cost Saving Opportunities for the Glass Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

in a strategic energy management program are depicted inof a strategic energy management program A successfulfocused and strategic energy management program will help to

Worrell, Ernst

2008-01-01T23:59:59.000Z

147

Risk Management Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides a framework for identifying and managing key technical, schedule, and cost risks through applying the requirements of DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE G 413.3-7A, dated 1-12-11. Does not cancel other directives.

2008-09-16T23:59:59.000Z

148

Statistical Directions for the Analysis of Participatory Mobile Health Asthma Management Data  

E-Print Network [OSTI]

using mobile phone technology for the management of theirmanagement. Usage studies of modern mobile technologies have

Hasenstab, Kyle Andrew

2012-01-01T23:59:59.000Z

149

Agricultural Water Management 109 (2012) 8193 Contents lists available at SciVerse ScienceDirect  

E-Print Network [OSTI]

irrigation design and management parameters for alfalfa Maziar M. Kandelousa, , Tamir Kamaia , Jasper A

Vrugt, Jasper A.

150

Energy Efficiency Improvement and Cost Saving Opportunities for the Glass Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

and CAC 2003). Centrifugal compressors are cost effectiveapplied to centrifugal and rotary screw compressors. Single

Worrell, Ernst

2008-01-01T23:59:59.000Z

151

Depressurization as an accident management strategy to minimize the consequences of direct containment heating  

SciTech Connect (OSTI)

Probabilistic Risk Assessments (PRAs) have identified severe accidents for nuclear power plants that have the potential to cause failure of the containment through direct containment heating (DCH). Prevention of DCH or mitigation of its effects may be possible using accident management strategies that intentionally depressurize the reactor coolant system (RCS). The effectiveness of intentional depressurization during a station blackout TMLB' sequence was evaluated considering the phenomenological behavior, hardware performance, and operational performance. Phenomenological behavior was calculated using the SCDAP/RELAP5 severe accident analysis code. Two strategies to mitigate DCH by depressurization of the RCS were considered. One strategy, called early depressurization, assumed that the reactor head vent and pressurizer power-operated relief valves (PORVs) were latched open at steam generator dryout. The second strategy, called late depression, assumed that the head vent and PORVs were latched open at a core exit temperature of {approximately}922 K (1200{degree}F). Depressurization of the RCS to a low value that may mitigate DCH was predicted prior to reactor pressure vessel breach for both early and late depressurization. The strategy of late depressurization is preferred over early depressurization because there are greater opportunities to recover plant functions prior to core damage and because failure uncertainties are lessened. 22 refs., 38 figs., 6 tabs.

Hanson, D.J.; Golden, D.W.; Chambers, R.; Miller, J.D.; Hallbert, B.P.; Dobbe, C.A. (EG and G Idaho, Inc., Idaho Falls, ID (USA))

1990-10-01T23:59:59.000Z

152

Improved Battery Pack Thermal Management to Reduce Cost and Increase Energy Density: Cooperative Research and Development Final Report, CRADA Number CRD-12-499  

SciTech Connect (OSTI)

Under this CRADA NREL will support Creare's project for the Department of Energy entitled 'Improved Battery Pack Thermal Management to Reduce Cost and Increase Energy Density' which involves the development of an air-flow based cooling product that increases energy density, safety, and reliability of hybrid electric vehicle battery packs.

Smith, K.

2013-10-01T23:59:59.000Z

153

Reservoir Management in Mediterranean Climates through the European Water Framework Directive  

E-Print Network [OSTI]

environmental best management practices through cross compliance in part to address this strain on waterwater management: the case of two Portuguese reservoirs with different water quality. International Journal of Environmental

O'Reilly, Clare; Silberblatt, Rafael

2009-01-01T23:59:59.000Z

154

The CAMU Rule: A tool for implementing a protective, cost-effective remedy at the Fernald Environmental Management Project  

SciTech Connect (OSTI)

The Fernald Environmental Management Project (FEMP) is a former uranium processing facility currently under remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act as amended (CERCLA). Contamination at the FEMP consists of low-level radioactivity, hazardous substances, hazardous wastes and/or mixed wastes. Regulations promulgated under the Resource Conservation and Recovery Act as amended (RCRA) are evaluated as applicable or relevant and appropriate requirements (ARARs) for remediation of the FEMP. Historically, joint CERCLA-RCRA guidance dictated that hazardous waste could not be treated, or moved out of the designated area of contiguous contamination (AOC), without triggering land disposal restrictions (LDRs) or minimum technology requirements (MTRs). To avoid invoking these stringent requirements, in situ capping was chosen as the lower cost remedy at many sites, although on-site disposal and/or treatment of hazardous wastes would have been more protective. The Corrective Action Management Units (CAMUs) and Temporary Units (TUs) Final Rule [58 FR 8658, Vol. 58, No. 29, hereinafter the {open_quotes}CAMU Rule{close_quotes}], promulgated on February 16, 1993, provides facilities regulated under RCRA corrective action authority with greater flexibility to move, treat, and dispose of wastes on site without triggering LDRs or MTRs, thereby encouraging application of innovative technologies and more protective remedies. The waste acceptance criteria for the on-site disposal facility is based on site-specific considerations including the mobility of the contaminants through the underlying site geology and the protectiveness of the engineered liners. Application of the {open_quotes}CAMU Rule{close_quotes} allows for disposition in the on-site facility based on these technical considerations rather than on regulatory classifications.

Dupuis-Nouille, E.M. [Fernald Environmental Management Project, Cincinnati, OH (United States); Goidell, L.C.; Strimbu, M.J. [Jacobs Engineering Group of Ohio, Inc., Cincinnati, OH (United States)

1995-10-01T23:59:59.000Z

155

Structural health and prognostics management for offshore wind turbines : case studies of rotor fault and blade damage with initial O&M cost modeling.  

SciTech Connect (OSTI)

Operations and maintenance costs for offshore wind plants are significantly higher than the current costs for land-based (onshore) wind plants. One way to reduce these costs would be to implement a structural health and prognostic management (SHPM) system as part of a condition based maintenance paradigm with smart load management and utilize a state-based cost model to assess the economics associated with use of the SHPM system. To facilitate the development of such a system a multi-scale modeling approach developed in prior work is used to identify how the underlying physics of the system are affected by the presence of damage and faults, and how these changes manifest themselves in the operational response of a full turbine. This methodology was used to investigate two case studies: (1) the effects of rotor imbalance due to pitch error (aerodynamic imbalance) and mass imbalance and (2) disbond of the shear web; both on a 5-MW offshore wind turbine in the present report. Based on simulations of damage in the turbine model, the operational measurements that demonstrated the highest sensitivity to the damage/faults were the blade tip accelerations and local pitching moments for both imbalance and shear web disbond. The initial cost model provided a great deal of insight into the estimated savings in operations and maintenance costs due to the implementation of an effective SHPM system. The integration of the health monitoring information and O&M cost versus damage/fault severity information provides the initial steps to identify processes to reduce operations and maintenance costs for an offshore wind farm while increasing turbine availability, revenue, and overall profit.

Myrent, Noah J. [Purdue Center for Systems Integrity, Lafayette, IN; Kusnick, Joshua F. [Purdue Center for Systems Integrity, Lafayette, IN; Barrett, Natalie C. [Purdue Center for Systems Integrity, Lafayette, IN; Adams, Douglas E. [Purdue Center for Systems Integrity, Lafayette, IN; Griffith, Daniel Todd

2013-04-01T23:59:59.000Z

156

A Low-cost, High-yield Process for the Direct Productin of High Energy Density Liquid Fuel from Biomass  

SciTech Connect (OSTI)

The primary objective and outcome of this project was the development and validation of a novel, low-cost, high-pressure fast-hydropyrolysis/hydrodeoxygenation (HDO) process (H{sub 2}Bioil) using supplementary hydrogen (H{sub 2}) to produce liquid hydrocarbons from biomass. The research efforts under the various tasks of the project have culminated in the first experimental demonstration of the H2Bioil process, producing 100% deoxygenated >C4+ hydrocarbons containing 36-40% of the carbon in the feed of pyrolysis products from biomass. The demonstrated H{sub 2}Bioil process technology (i.e. reactor, catalyst, and downstream product recovery) is scalable to a commercial level and is estimated to be economically competitive for the cases when supplementary H{sub 2} is sourced from coal, natural gas, or nuclear. Additionally, energy systems modeling has revealed several process integration options based on the H{sub 2}Bioil process for energy and carbon efficient liquid fuel production. All project tasks and milestones were completed or exceeded. Novel, commercially-scalable, high-pressure reactors for both fast-hydropyrolysis and hydrodeoxygenation were constructed, completing Task A. These reactors were capable of operation under a wide-range of conditions; enabling process studies that lead to identification of optimum process conditions. Model compounds representing biomass pyrolysis products were studied, completing Task B. These studies were critical in identifying and developing HDO catalysts to target specific oxygen functional groups. These process and model compound catalyst studies enabled identification of catalysts that achieved 100% deoxygenation of the real biomass feedstock, sorghum, to form hydrocarbons in high yields as part of Task C. The work completed during this grant has identified and validated the novel and commercially scalable H2Bioil process for production of hydrocarbon fuels from biomass. Studies on model compounds as well as real biomass feedstocks were utilized to identify optimized process conditions and selective HDO catalyst for high yield production of hydrocarbons from biomass. In addition to these experimental efforts, in Tasks D and E, we have developed a mathematical optimization framework to identify carbon and energy efficient biomass-to-liquid fuel process designs that integrate the use of different primary energy sources along with biomass (e.g. solar, coal or natural gas) for liquid fuel production. Using this tool, we have identified augmented biomass-to-liquid fuel configurations based on the fast-hydropyrolysis/HDO pathway, which was experimentally studied in this project. The computational approach used for screening alternative process configurations represents a unique contribution to the field of biomass processing for liquid fuel production.

Agrawal, Rakesh

2014-02-21T23:59:59.000Z

157

Energy Efficiency Improvement and Cost Saving Opportunities for the U.S. Iron and Steel Industry An ENERGY STAR(R) Guide for Energy and Plant Managers  

SciTech Connect (OSTI)

Energy is an important cost factor in the U.S iron and steel industry. Energy efficiency improvement is an important way to reduce these costs and to increase predictable earnings, especially in times of high energy price volatility. There are a variety of opportunities available at individual plants in the U.S. iron and steel industry to reduce energy consumption in a cost-effective manner. This Energy Guide discusses energy efficiency practices and energy-efficient technologies that can be implemented at the component, process, facility, and organizational levels. A discussion of the structure, production trends, energy consumption, and greenhouse gas emissions of the iron and steel industry is provided along with a description of the major process technologies used within the industry. Next, a wide variety of energy efficiency measures are described. Many measure descriptions include expected savings in energy and energy-related costs, based on case study data from real-world applications in the steel and related industries worldwide. Typical measure payback periods and references to further information in the technical literature are also provided, when available. The information in this Energy Guide is intended to help energy and plant managers in the U.S. iron and steel industry reduce energy consumption and greenhouse gas emissions in a cost-effective manner while maintaining the quality of products manufactured. Further research on the economics of all measures?and on their applicability to different production practices?is needed to assess their cost effectiveness at individual plants.

Worrell, Ernst; Blinde, Paul; Neelis, Maarten; Blomen, Eliane; Masanet, Eric

2010-10-21T23:59:59.000Z

158

Costing of Joining Methods -Arc Welding Costs  

E-Print Network [OSTI]

Costing of Joining Methods - Arc Welding Costs ver. 1 ME 6222: Manufacturing Processes and Systems.S. Colton © GIT 2009 5 #12;LaborLabor Di t ti f ldi· Direct time of welding ­ time to produce a length of weld ­ labor rate ­ multiplication gives labor cost per length · Set-up time, etc. · Personal time

Colton, Jonathan S.

159

Energy Efficiency Improvement and Cost Saving Opportunities for the Pharmaceutical Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

costs, and increased energy awareness among employees (Wyethimprove the awareness of personnel with regard to energy useawareness Build capacity Not addressed No promotion of energy

Galitsky, Christina

2008-01-01T23:59:59.000Z

160

Energy Efficiency Improvement and Cost Saving Opportunities for the Pharmaceutical Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

refrigeration systems lead to high compressor energy consumptionrefrigeration systems can help energy managers and facilities engineers track energy consumption,

Galitsky, Christina

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Reservoir Management in Mediterranean Climates through the European Water Framework Directive  

E-Print Network [OSTI]

By 2015, member states to the Water Framework Directive arestate and a Mediterranean-climate country, surface water andPlans member states may designate surface water bodies as

O'Reilly, Clare; Silberblatt, Rafael

2009-01-01T23:59:59.000Z

162

Direct Digital Control- A Tool for Energy Management of HVAC Systems  

E-Print Network [OSTI]

Direct digital control (DDC) applied to heating, ventilating, and air-conditioning (HVAC) systems corrects many of the deficiencies of conventional automatic temperature control systems. By applying new control sequences, DDC optimizes HVAC energy...

Swanson, K.

163

Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry: An ENERGY STAR Guide for Energy and Plant Managers  

SciTech Connect (OSTI)

The motor vehicle industry in the U.S. spends about $3.6 billion on energy annually. In this report, we focus on auto assembly plants. In the U.S., over 70 assembly plants currently produce 13 million cars and trucks each year. In assembly plants, energy expenditures is a relatively small cost factor in the total production process. Still, as manufacturers face an increasingly competitive environment, energy efficiency improvements can provide a means to reduce costs without negatively affecting the yield or the quality of the product. In addition, reducing energy costs reduces the unpredictability associated with variable energy prices in today?s marketplace, which could negatively affect predictable earnings, an important element for publicly-traded companies such as those in the motor vehicle industry. In this report, we first present a summary of the motor vehicle assembly process and energy use. This is followed by a discussion of energy efficiency opportunities available for assembly plants. Where available, we provide specific primary energy savings for each energy efficiency measure based on case studies, as well as references to technical literature. If available, we have listed costs and typical payback periods. We include experiences of assembly plants worldwide with energy efficiency measures reviewed in the report. Our findings suggest that although most motor vehicle companies in the U.S. have energy management teams or programs, there are still opportunities available at individual plants to reduce energy consumption cost effectively. Further research on the economics of the measures for individual assembly plants, as part of an energy management program, is needed to assess the potential impact of selected technologies at these plants.

Galitsky, Christina; Galitsky, Christina; Worrell, Ernst

2008-01-01T23:59:59.000Z

164

Forest Ecology and Management 260 (2010) 930937 Contents lists available at ScienceDirect  

E-Print Network [OSTI]

offset projects. Reducing wildfire risk requires a reduction in and redistribution of carbon stocks Ecology and Management journal homepage: www.elsevier.com/locate/foreco Full length article Carbon 12 March 2010 Received in revised form 9 June 2010 Accepted 11 June 2010 Keywords: Carbon Wildfire

North, Malcolm

165

Cost effectiveness of recycling: A systems model  

SciTech Connect (OSTI)

Highlights: • Curbside collection of recyclables reduces overall system costs over a range of conditions. • When avoided costs for recyclables are large, even high collection costs are supported. • When avoided costs for recyclables are not great, there are reduced opportunities for savings. • For common waste compositions, maximizing curbside recyclables collection always saves money. - Abstract: Financial analytical models of waste management systems have often found that recycling costs exceed direct benefits, and in order to economically justify recycling activities, externalities such as household expenses or environmental impacts must be invoked. Certain more empirically based studies have also found that recycling is more expensive than disposal. Other work, both through models and surveys, have found differently. Here we present an empirical systems model, largely drawn from a suburban Long Island municipality. The model accounts for changes in distribution of effort as recycling tonnages displace disposal tonnages, and the seven different cases examined all show that curbside collection programs that manage up to between 31% and 37% of the waste stream should result in overall system savings. These savings accrue partially because of assumed cost differences in tip fees for recyclables and disposed wastes, and also because recycling can result in a more efficient, cost-effective collection program. These results imply that increases in recycling are justifiable due to cost-savings alone, not on more difficult to measure factors that may not impact program budgets.

Tonjes, David J., E-mail: david.tonjes@stonybrook.edu [Department of Technology and Society, College of Engineering and Applied Sciences, Stony Brook University, Stony Brook, NY 11794-3560 (United States); Waste Reduction and Management Institute, School of Marine and Atmospheric Sciences, Stony Brook University, Stony Brook, NY 11794-5000 (United States); Center for Bioenergy Research and Development, Advanced Energy Research and Technology Center, Stony Brook University, 1000 Innovation Rd., Stony Brook, NY 11794-6044 (United States); Mallikarjun, Sreekanth, E-mail: sreekanth.mallikarjun@stonybrook.edu [Department of Technology and Society, College of Engineering and Applied Sciences, Stony Brook University, Stony Brook, NY 11794-3560 (United States)

2013-11-15T23:59:59.000Z

166

Cost analysis guidelines  

SciTech Connect (OSTI)

The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

Strait, R.S.

1996-01-10T23:59:59.000Z

167

Provides overall leadership for and management of the University's human resources strategy. Responsible for planning, organizing, directing, implementing, and administering human resources strategy, policies and  

E-Print Network [OSTI]

Provides overall leadership for and management of the University's human resources strategy. Responsible for planning, organizing, directing, implementing, and administering human resources strategy resource matters; collaborates with senior leaders to build a performance based culture that emphasizes

Dasgupta, Dipankar

168

Energy Efficiency Improvement and Cost Saving Opportunities for the Petrochemical Industry - An ENERGY STAR(R) Guide for Energy and Plant Managers  

SciTech Connect (OSTI)

Energy is the most important cost factor in the U.S petrochemical industry, defined in this guide as the chemical industry sectors producing large volume basic and intermediate organic chemicals as well as large volume plastics. The sector spent about $10 billion on fuels and electricity in 2004. Energy efficiency improvement is an important way to reduce these costs and to increase predictable earnings, especially in times of high energy price volatility. There are a variety of opportunities available at individual plants in the U.S. petrochemical industry to reduce energy consumption in a cost-effective manner. This Energy Guide discusses energy efficiency practices and energy efficient technologies that can be implemented at the component, process, facility, and organizational levels. A discussion of the trends, structure, and energy consumption characteristics of the petrochemical industry is provided along with a description of the major process technologies used within the industry. Next, a wide variety of energy efficiency measures are described. Many measure descriptions include expected savings in energy and energy-related costs, based on case study data from real-world applications in the petrochemical and related industries worldwide. Typical measure payback periods and references to further information in the technical literature are also provided, when available. The information in this Energy Guide is intended to help energy and plant managers in the U.S. petrochemical industry reduce energy consumption in a cost-effective manner while maintaining the quality of products manufactured. Further research on the economics of all measures--and on their applicability to different production practices--is needed to assess their cost effectiveness at individual plants.

Neelis, Maarten; Worrell, Ernst; Masanet, Eric

2008-09-01T23:59:59.000Z

169

International Symposium on New Directions in Urban Water Management 12-14 September 2007, UNESCO Paris  

E-Print Network [OSTI]

periods. Combined systems are equipped with CSOs' devices to avoid overflows on streets or house basement to reach and maintain a good ecological status (EU, Directive 2000). For highly modified water masses like in urban and periurban areas, the objective of a maximal ecological potential must be defined and reached

Boyer, Edmond

170

Hospitality Management Hospitality Management  

E-Print Network [OSTI]

of the global hospitality industry. Academic Offerings HOSPITALITY AND FOOD SERVICE MANAGEMENT MINOR HOSPITALITY AND FOOD SERVICE MANAGEMENT MINOR Students pursuing programs in other areas of study may choose a minor Lodging Management 3 HPM 309 Sports Arena Management 3 HPM 312* Cost Control in Food Services (Prereq

McConnell, Terry

171

Startup Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

1997-03-28T23:59:59.000Z

172

Energy Efficiency Improvement and Cost Saving Opportunities for Breweries: An ENERGY STAR(R) Guide for Energy and Plant Managers  

SciTech Connect (OSTI)

Annually, breweries in the United States spend over $200 million on energy. Energy consumption is equal to 38 percent of the production costs of beer, making energy efficiency improvement an important way to reduce costs, especially in times of high energy price volatility. After a summary of the beer making process and energy use, we examine energy efficiency opportunities available for breweries. We provide specific primary energy savings for each energy efficiency measure based on case studies that have implemented the measures, as well as references to technical literature. If available, we have also listed typical payback periods. Our findings suggest that given available technology, there are still opportunities to reduce energy consumption cost-effectively in the brewing industry. Brewers value highly the quality, taste and drinkability of their beer. Brewing companies have and are expected to continue to spend capital on cost-effective energy conservation measures that meet these quality, taste and drinkability requirements. For individual plants, further research on the economics of the measures, as well as their applicability to different brewing practices, is needed to assess implementation of selected technologies.

Galitsky, Christina; Martin, Nathan; Worrell, Ernst; Lehman, Bryan

2003-09-01T23:59:59.000Z

173

Securing the Sustainability of Global Medical Nuclear Supply Chains Through Economic Cost Recovery, Risk Management, and Optimization  

E-Print Network [OSTI]

Securing the Sustainability of Global Medical Nuclear Supply Chains Through Economic Cost Recovery of Business, Economics and Law University of Gothenburg, Gothenburg, Sweden Ladimer S. Nagurney Department of the complex operations of medical nuclear supply chains in the case of the radioisotope molybdenum

Nagurney, Anna

174

Energy Efficiency Improvement and Cost Saving Opportunities for the Fruit and Vegetable Processing Industry. An ENERGY STAR Guide for Energy and Plant Managers  

SciTech Connect (OSTI)

The U.S. fruit and vegetable processing industry--defined in this Energy Guide as facilities engaged in the canning, freezing, and drying or dehydrating of fruits and vegetables--consumes over $800 million worth of purchased fuels and electricity per year. Energy efficiency improvement isan important way to reduce these costs and to increase predictable earnings, especially in times of high energy price volatility. There are a variety of opportunities available at individual plants in the U.S. fruit and vegetable processing industry to reduce energy consumption in a cost-effective manner. This Energy Guide discusses energy efficiency practices and energy-efficient technologies that can be implemented at the component, process, facility, and organizational levels. A discussion of the trends, structure, and energy consumption characteristics of the U.S. fruit and vegetable processing industry is provided along with a description of the major process technologies used within the industry. Next, a wide variety of energy efficiency measures applicable to fruit and vegetable processing plants are described. Many measure descriptions include expected savings in energy and energy-related costs, based on case study data from real-world applications in fruit and vegetable processing facilities and related industries worldwide. Typical measure payback periods and references to further information in the technical literature are also provided, when available. Given the importance of water in fruit and vegetable processing, a summary of basic, proven measures for improving plant-level water efficiency are also provided. The information in this Energy Guide is intended to help energy and plant managers in the U.S. fruit and vegetable processing industry reduce energy and water consumption in a cost-effective manner while maintaining the quality of products manufactured. Further research on the economics of all measures--as well as on their applicability to different production practices--is needed to assess their cost effectiveness at individual plants.

Masanet, Eric; Masanet, Eric; Worrell, Ernst; Graus, Wina; Galitsky, Christina

2008-01-01T23:59:59.000Z

175

Characterization of Direct Push Vadose Zone Sediments from the T and TY Waste Management Areas  

SciTech Connect (OSTI)

This report contains all the geochemical and selected physical characterization data collected on vadose zone sediment recovered from 5 direct push characterization holes emplaced to investigate vadose zone contamination associated with leaks from tanks 241-TY-105 (UPR-200-W-152) and 241-TY-106 (UPR-200-W-153). Tank 241-TY-105 is estimated to have leaked 35,000 gal of tributyl phosphate (TBP) waste from the uranium recovery process to the vadose zone in 1960. Tank 241-TY-106 is estimated to have leaked 20,000 gal of TBP-uranium recovery waste to the vadose zone in 1959. Although several drywells in the vicinity of tank 241-TY-106 contain measurable quantities of cesium-137 and/or cobalt-60, their relatively low concentrations indicate that the contaminant inventory in the vadose zone around tank 241-TY-106 is quite small. Additionally, this report contains all the geochemical and selected physical characterization data collected on vadose zone sediment recovered from 7 direct push characterization holes emplaced to investigate vadose zone contamination associated with an overfill event and leak from tank 241-T-101.

Brown, Christopher F.; Valenta, Michelle M.; Serne, R. Jeffrey; Bjornstad, Bruce N.; Lanigan, David C.; Iovin, Cristian; Clayton, Ray E.; Geiszler, Keith N.; Clayton, Eric T.; Kutnyakov, Igor V.; Baum, Steven R.; Lindberg, Michael J.; Orr, Robert D.

2007-06-08T23:59:59.000Z

176

Vehicle Technologies Office Merit Review 2014: Significant Cost Improvement of Li-ion Cells Through Non-NMP Electrode Coating, Direct Separator Coating, and Fast Formation Technologies  

Broader source: Energy.gov [DOE]

Presentation given by Johnson Controls at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about significant cost improvement...

177

The DOE Office of Environmental Management International Collaboration Program Overview: Interactions, Agreements, and Future Direction  

SciTech Connect (OSTI)

As the lead U.S. agency for the environmental cleanup, the Department of Energy (DOE) Office of Environmental Management (EM) carries out international activities in support of U.S. policies and objectives regarding accelerated risk reduction and remediation of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To achieve this, EM pursues collaborations with foreign government organizations, educational institutions, and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. An initiative of the International Program is to link international experience and expertise to the technical needs of the overall EM mission and to foster further collaboration with international partners to promote those needs. This paper will provide an overview of the current international program and how it plans to leverage existing, and when necessary, new international partnerships to support the overall EM cleanup mission. In addition it will examine the future vision of the international program to promote the EM mission through a focus on transformational solutions, science, and technology development.

Marra, James C.; Fox, Kevin M.; Jannik, Gerald T.; Farfan, Eduardo B.; Kim, Dong-Sang; Vienna, John D.; Roach, Jay; Aloy, A. S.; Stefanovsky, S. V.; Lopukh, D. B.; Bondarkov, M. D.; Gerdes, Kurt D.; Han, Ana M.

2010-02-10T23:59:59.000Z

178

Energy Efficiency Improvement and Cost Saving Opportunities for the Petrochemical Industry - An ENERGY STAR(R) Guide for Energy and Plant Managers  

E-Print Network [OSTI]

strategic energy management program. ..in a strategic energy management program are depicted inof a strategic energy management program. Evaluating

Neelis, Maarten

2008-01-01T23:59:59.000Z

179

Energy Efficiency Improvement and Cost Saving Opportunities for the Fruit and Vegetable Processing Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

Strategic Energy Management Program .Systems A Strategic Energy Management Program Changing howin a strategic energy management program are depicted in

Masanet, Eric

2008-01-01T23:59:59.000Z

180

Effects of commercialized deer hunting arrangements on ranch organization, management, costs, and income--the Llano Basin of Texas  

E-Print Network [OSTI]

. To determine the returns possible from deer hunting leases on the representative ranches if the harvest rate recommen- dations of wildlife management personnel are followed. 18 This research ccntributes to Regional Research project W-79, "Economic Analysis... Income and Expense Summary Leasing Arrangements Used to Operate Shooting Preserves Description of Hunting Systems Season lease Day lease Season lease with doe hunting option Season and day lease combination Relative Profitability of the Various...

Forrest, Nathan Kelly

1968-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Energy-Smart Building Choices: How School Facilities Managers and Business Officials Are Reducing Operating Costs and Saving Money (Revision)  

SciTech Connect (OSTI)

Operating a typical school today is no easy task for facilities managers and business officials. You're expected to deliver increased services with constrained operating budgets. Many schools stay open for longer hours to accommodate community use of the facilities. Dilapidated buildings and systems gobble up energy, yet in many districts, maintenance needs are overshadowed by the need for expansion or new construction to serve growing student populations and changing educational needs.

Not Available

2002-02-01T23:59:59.000Z

182

Engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 series) at the Weldon Spring Site Chemical Plant, Weldon Spring, Missouri  

SciTech Connect (OSTI)

The US Department of Energy, under its Surplus Facilities Management Program (SFMP), is responsible for cleanup activities at the Weldon-Spring site, located near Weldon Spring, Missouri. The site consists of two noncontiguous areas: (1) a raffinate pits and chemical plant area and (2) a quarry. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support a proposed removal action to manage 15 nonprocess buildings, identified as the 15 Series buildings, at the chemical plant on the Weldon Spring site. These buildings have been nonoperational for more than 20 years, and the deterioration that has occurred during this time has resulted in a potential threat to site workers, the general public, and the environment. The EE/CA documentation of this proposed action is consistent with guidance from the US Environmental Protection Agency (EPA) that addresses removal actions at sites subject to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986. Actions at the Weldon Spring site are subject to CERCLA requirements because the site is on the EPA`s National Priorities List. The objectives of this report are to (1) identify alternatives for management of the nonprocess buildings; (2) document the selection of response activities that will mitigate the potential threat to workers, the public, and the environment associated with these buildings; and (3) address environmental impacts associated with the proposed action.

MacDonell, M M; Peterson, J M

1989-05-01T23:59:59.000Z

183

Lower Cost Carbon Fiber Precursors  

Broader source: Energy.gov (indexed) [DOE]

performing fiber. (600-750 KSI) Barriers: Addresses the need for higher performance low cost fiber for hydrogen storage tanks and energy management structures of automobiles....

184

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network [OSTI]

in a strategic energy management program are depicted inof a strategic energy management program A successful

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

185

A Fresh Perspective for Managing Water in California: Insights from Applying the European Water Framework Directive to the Russian River  

E-Print Network [OSTI]

environmental and economic impacts associated with water managementfor environmental, water resources, and economic managementRiver basin water management, by establishing environmental

Grantham, Ted; Christian-Smith, Juliet; Kondolf, G. Mathias; Scheuer, Stefan

2008-01-01T23:59:59.000Z

186

Operating Costs Estimates Cost Indices  

E-Print Network [OSTI]

to update costs of specific equipment, raw material or labor or CAPEX and OPEX of entire plants Cost Indices

Boisvert, Jeff

187

Vehicle Technologies Office Merit Review 2014: Cost-Competitive Advanced Thermoelectric Generators for Direct Conversion of Vehicle Waste Heat into Useful Electrical Power  

Broader source: Energy.gov [DOE]

Presentation given by General Motors at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about cost-competitive advanced...

188

Plant Energy Cost Optimization Program (PECOP)  

E-Print Network [OSTI]

The Plant Energy Cost Optimization Program (PECOP) is a Management System designed to reduce operating cost in a continuous operating multi product plant by reviewing all cost factors and selecting plant wide production schedules which are most...

Robinson, A. M.

1980-01-01T23:59:59.000Z

189

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network [OSTI]

2005. Navigating Energy Management: A Roadmap for Business.Characteristics and Energy Management Opportunities. BurtonCaffal, C. 1995. Energy Management in Industry. Centre for

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

190

Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry: An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

Caffal, C. (1995). Energy Management in Industry. Centre forPollution Prevention/Energy Management. General Motorsactions, develop an energy management plan for business; and

Galitsky, Christina

2008-01-01T23:59:59.000Z

191

Energy Efficiency Improvement and Cost Saving Opportunities for the Fruit and Vegetable Processing Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

actions, develop an energy management plan for business; andCaffal, C. (1995). Energy Management in Industry. Centre forEquipment. Federal Energy Management Program, Washington,

Masanet, Eric

2008-01-01T23:59:59.000Z

192

Energy Efficiency Improvement and Cost Saving Opportunities for the U.S. Iron and Steel Industry An ENERGY STAR(R) Guide for Energy and Plant Managers  

E-Print Network [OSTI]

strategic energy management program..Chapter 8) Strategic Energy Management Programs Assessments8.1 Strategic Energy Management Programs Understanding how

Worrell, Ernst

2011-01-01T23:59:59.000Z

193

Energy Efficiency Improvement and Cost Saving Opportunities for the Dairy Processing Industry: An ENERGY STAR? Guide for Energy and Plant Managers  

E-Print Network [OSTI]

Strategic Energy Management Program ..Systems 6.1 Strategic Energy Management Program Improvingin a strategic energy management program were identified and

Brush, Adrian

2014-01-01T23:59:59.000Z

194

Top Management Involvement in the Adoption of Energy Efficiency Projects  

E-Print Network [OSTI]

of Recommendations Top Management * Energy Costs/Sales TopTop Management Top Management * Energy Costs/Sales TopTop Management Top Management * Energy Costs/Sales Top

Blass, Vered; Corbett, Charles J.; Delmas, Magali A; Muthulingam, Suresh

2011-01-01T23:59:59.000Z

195

Reactor Cost Analysis Brian James  

E-Print Network [OSTI]

Reactor Cost Analysis Brian James Directed Technologies, Inc. 6-7 November 2007 This presentation specification & optimization · Capital cost estimation · Projected hydrogen $/kg #12;Directed Technologies, Inc/WGS Membrane Reactor OTM/ Water-Splitting ANL With WGS #12;Directed Technologies, Inc. 6-7 November 2007 BILIWG

196

SEGALL, NOA. Design and Prototyping of a Cognitive Model-Based Decision Support Tool for Anesthesia Provider Management of Crisis Situations. (Under the direction of David B.  

E-Print Network [OSTI]

for Anesthesia Provider Management of Crisis Situations. (Under the direction of David B. Kaber.) This research crisis situations that would prompt the anesthesia provider to contact an attending physician. In addition, the tool could be used by practitioners working alone to deliver anesthesia. A novel approach

Kaber, David B.

197

Low-Cost Manufacturable Microchannel Systems for Passive  

E-Print Network [OSTI]

for use in fuel cell systems need development in order to achieve cost targets. Low-cost, highLow-Cost Manufacturable Microchannel Systems for Passive PEM Water Management IIPS Number 16910 LowLow--CostCost;2 Project objective: Create a low cost and passive PEM water management system Project objective

198

Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry: An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

in a strategic energy management program are depicted inelements of a strategic energy management program A quick

Galitsky, Christina

2008-01-01T23:59:59.000Z

199

40900 Federal Register / Vol. 74, No. 155 / Thursday, August 13, 2009 / Rules and Regulations addition to the direct costs described in  

E-Print Network [OSTI]

of the Proposed Rule IV. Legal Authority V. Environmental Impact VI. Analysis of Economic Impacts A. Objectives of the Impact E. Benefits of the Final Rule F. Costs of the Final Rule G. Minimizing the Impact on Small. The documentation must be accompanied by a statement that an independent certified public accountant has reviewed

Lee, Daeyeol

200

Evaluating cost-reduction alternatives and low-cost sourcing opportunities for aerospace castings and forgings  

E-Print Network [OSTI]

As companies continue to outsource large portions of their manufacturing, managing costs in the supply chain is increasingly important in reducing overall costs and remaining competitive. Low-cost sourcing has become an ...

Obermoller, Amber J

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

AN ALERT MANAGEMENT APPROACH TO DATA QUALITY: LESSONS LEARNED FROM THE  

E-Print Network [OSTI]

AN ALERT MANAGEMENT APPROACH TO DATA QUALITY: LESSONS LEARNED FROM THE VISA DATA AUTHORITY PROGRAM, Alert Management Systems INTRODUCTION There is now a relatively mature model, which is usually called of the time and costs involved, the framework we introduce directly manages data quality alerts and associated

Grossman, Robert

202

Notice of Intent to Develop Department of Energy Order 206.2 on Identity, Credential, and Access Management (ICAM)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of the proposed directive is to replace the information contained in DOE N 206.4, "Personal Identity Verification," approved June 29, 2007, and to establish a DOE directive on Identity, Credential, and Access Management (ICAM). Implementation of ICAM will result in cost avoidance and cost savings allowing reinvestment in DOE mission related work.

2007-06-29T23:59:59.000Z

203

Energy Efficiency Improvement and Cost Saving Opportunities for the Petrochemical Industry - An ENERGY STAR(R) Guide for Energy and Plant Managers  

E-Print Network [OSTI]

Caffal, C. (1995). Energy Management in Industry. Centre forU.S. DOE-OIT (2003a). Energy Management Program Benefits.actions, develop an energy management plan for business; and

Neelis, Maarten

2008-01-01T23:59:59.000Z

204

Energy Efficiency Improvement and Cost Saving Opportunities for the U.S. Iron and Steel Industry An ENERGY STAR(R) Guide for Energy and Plant Managers  

E-Print Network [OSTI]

actions, develop an energy management plan for business; andFigure 8-1. Main elements of a strategic energy managementCaffal, C. (1995). Energy Management in Industry. Centre for

Worrell, Ernst

2011-01-01T23:59:59.000Z

205

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network [OSTI]

Determining Electric Motor Load and Efficiency. Among theEnergy Efficiency Alliance, Electric Motor Management. 2001.Energy Efficiency Alliance, Electric Motor Management. 2001.

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

206

Cost Estimator  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a senior cost and schedule estimator who is responsible for preparing life-cycle cost and schedule estimates and analyses associated with the...

207

Decommissioning Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

Sanford, P. C.; Stevens, J. L.; Brandt, R.

2002-02-26T23:59:59.000Z

208

Project Management Design, Value & Cost  

E-Print Network [OSTI]

Administration Real Estate Law & Ethics Property & Construction Economics Construction Investment & Planning Real Estate Valuation & Appraisal International Real Estate Investment & Finance Property & Construction Nottingham Law School Intellectual Property Law Principles of Intellectual Property Law Data Protection

Evans, Paul

209

A study of design oriented cost estimation  

E-Print Network [OSTI]

except for the cost of material, and does not distinguish direct and indirect costs involved in the production. Vernon (1968) describes costs as standard or actual. Standard cost is a predicted cost reflecting what a part or product should cost, while... parts only. Some researchers have used the component cost in making decisions regarding the manufacturing process. Egbelu and others (Egbelu et al. , 1982) describe a model for making decisions about cast parts. They define a relationship associating...

Raman, Ramchand P.

1992-01-01T23:59:59.000Z

210

Report to Congress on the U.S. Department of Energy`s Environmental Management Science Program: Research funded and its linkages to environmental cleanup problems, and high out-year cost environmental management project descriptions. Volume 3 of 3 -- Appendix C  

SciTech Connect (OSTI)

The Department of Energy`s Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation`s nuclear complex. Appendix C provides details about each of the Department`s 82 high cost projects and lists the EMSP research awards with potential to impact each of these projects. The high cost projects listed are those having costs greater than $50 million in constant 1998 dollars from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and having costs of quantities of material associated with an environmental management problem area. The high cost project information is grouped by operations office and organized by site and project code. Each operations office section begins with a list of research needs associated with that operations office. Potentially related research awards are listed by problem area in the Index of Research Awards by Environmental Management Problem Area, which can be found at the end of appendices B and C. For projects that address high risks to the public, workers, or the environment, refer also the Health/Ecology/Risk problem area awards. Research needs are programmatic or technical challenges that may benefit from knowledge gained through basic research.

NONE

1998-04-01T23:59:59.000Z

211

Directions: Members should also enroll in the Horse Management project and keep an accurate and up-to-date management record.  

E-Print Network [OSTI]

-to-date management record. Participation in the riding series is strictly on an elective basis. The riding projects _____________________________________________ VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY VIRGINIA STATE UNIVERSITY Virginia Cooperative employer. Issued in furtherance of Cooperative Extension work, Virginia Polytechnic Institute and State

Liskiewicz, Maciej

212

Cost of documenting the NISC project.  

SciTech Connect (OSTI)

The project team selected a computer-based approach for the NISC project record management system. The team is convinced that this approach did cut direct costs . The major advantage, that the team believes did help the project, comes in the area of having just one central point for all design and construction information related to the project . The other benefit to the project will come over the thirty-year design life of the project through reduced costs to design changes to the facility . The team estimates that a reasonable saving for the project (including future modifications) will be about $2,OOOK or about 3% of the project construction costs . The cost increase of scanning non-electric documents will decrease for other projects in the future as more project related information is computer generated . Many the subcontractors on the NISC project had not completely converted to computer based systems for there own internal operation during the life of the NISC project. However, as more project related documents are generated in electronic form this type of cost will reduce .

Stutz, R. A. (Roger Alan)

2003-01-01T23:59:59.000Z

213

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

SciTech Connect (OSTI)

As American drinking water agencies face higher production costs, demand, and energy prices, they seek opportunities to reduce costs without negatively affecting the quality of the water they deliver. This guide describes resources for cost-effectively improving the energy efficiency of U.S. public drinking water facilities. The guide (1) describes areas of opportunity for improving energy efficiency in drinking water facilities; (2) provides detailed descriptions of resources to consult for each area of opportunity; (3) offers supplementary suggestions and information for the area; and (4) presents illustrative case studies, including analysis of cost-effectiveness.

Brown, Moya Melody, Camilla Dunham Whitehead, Rich; Dunham Whitehead, Camilla; Brown, Rich

2010-09-30T23:59:59.000Z

214

Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry: An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

et al. 1998). Centrifugal compressors are cost effective2 psi) on a centrifugal air compressor results in savings ofto centrifugal and rotary screw compressors. Changing the

Galitsky, Christina

2008-01-01T23:59:59.000Z

215

Cost Principles Webinar for DOE Grant Recipients  

Broader source: Energy.gov [DOE]

The Office of Management and Budget (OMB) Cost Principles in the Code of Federal Regulations (CFR) define, by organization type, what kinds of costs are allowable or unallowable for reimbursement...

216

Life Cycle Cost Analysis for Sustainable Buildings  

Broader source: Energy.gov [DOE]

To help facility managers make sound decisions, FEMP provides guidance and resources on applying life cycle cost analysis (LCCA) to evaluate the cost-effectiveness of energy and water efficiency investments.

217

Surveys in Operations Research and Management Science 16 (2011) 4966 Contents lists available at ScienceDirect  

E-Print Network [OSTI]

Surveys in Operations Research and Management Science 16 (2011) 49­66 Contents lists available measures, and their connection to utility theory, stochastic dominance, and other more established methods........................................................................................................................................................................................................................ 49 2. Utility theory, stochastic dominance, and risk-reward optimization paradigms

Uryasev, Stanislav

218

sions (EC) directives have both legally and functionally separated rail operations from infrastructure ownership and management, the  

E-Print Network [OSTI]

infrastructure ownership and management, the government-owned national railways still maintain a symbiotic rela exhibiting high levels of utilization, and slots will eventually come to be viewed as the valuable resources, administrative, and operational improvements (2). In such an envi- ronment, flexible means for utilizing slots

219

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

220

Microelectronics Reliability, Vol. 47, No. 12, pp. 1857-1864, December 2007 Life Cycle Cost Impact of Using Prognostic Health Management (PHM)  

E-Print Network [OSTI]

Microelectronics Reliability, Vol. 47, No. 12, pp. 1857-1864, December 2007 1 Life Cycle Cost , S. Ghelamc , P. Sandbornb , M. Gladec , B. Fouchera a EADS Corporate Research Center, 12 rue Pasteur that assumed unscheduled maintenance and fixed-interval scheduled maintenance were compared to the costs

Sandborn, Peter

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

2012 CERTS LAAR Program Peer Review - Integration and Extension of Direct Load Management of Smart Loads - Anna Scaglioni, UC Davis  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment( SampleEnergyof Environmental Management | Department

222

MANUFACTURING AND COST EVALUATION OF SECOND GENERATION HELIOSTATS VOLUME I - ANALYSIS AND RESULTS  

SciTech Connect (OSTI)

The Second Generation Heliostat Program involved five contractors who provided designs, manufacturing plans, and cost estimates for heliostats. The program was sponsored by the Department of Energy and managed by Sandia National Laboratories, Livermore. As part of the program, Pacific Northwest Laboratory (PNL) evaluated and compared the contractors' costs and production plans, and compared the actual costs of the Solar One (Barstow, California) pilot-plant heliostats to estimated mass production costs. One purpose of this review was to adjust contractor estimates to provide a common basis for cost comparisons. The five contractors were: Boeing Engineering and Construction, Martin Marietta Corporation, McDonnell Douglas Astronautics Company, Northrup Incorporated, and Westinghouse Electric Corporation. PNL evaluated the components and assembly of the five heliostats in terms of material, direct labor, production equipment, production building requirements, and overheads. Two adjustments were made to the costs estimated by the manufacturers. The first, producing "Adjusted Costs," was primarily to add items that appeared to have been omitted from the contractors' estimates or delete items that were not required. The second, called "Uniform Assumptions Costs," used common ground rules for major materials, building, labor, and overhead costs. The review of the contractors' production plans and cost estimates did not reveal any errors or omissions that would change the costs by more than 30%, when compared using uniform assumptions. This range is adequate for policy planning, and costs of $100/m{sup 2} appear achievable.

Drumheller,, K.; Bondurant,, P. D.; Brown,, D. R.; Williams,, T. A.

1981-09-01T23:59:59.000Z

223

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network [OSTI]

Efficiency Alliance, Electric Motor Management. 2001. Motor2002. United States Industrial Electric Motor Systems Marketaccessed March 23, Motors Electric motors represent one of

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

224

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network [OSTI]

3. defining the performance indicator(s) to use to measureand targets; 6. performance indicators; 7. appropriateManager/Energy Performance Indicators. Extensive regular

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

225

Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry: An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

Energy management systems Combined heat and power (CHP) CHPperiod was negligible. Combined heat and power (CHP) 5 . Forrequirements, the use of combined heat and power systems can

Galitsky, Christina

2008-01-01T23:59:59.000Z

226

Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry: An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

eines Energiemanagementsystems bei BMW Motoren. Europeanits business operations. BMW adopted an energy management2.6 years (CADDET, 1995c). BMW applied powder coats at their

Galitsky, Christina

2008-01-01T23:59:59.000Z

227

Audit Costs for the 1986 Texas Energy Cost Containment Program  

E-Print Network [OSTI]

Direct program costs for detailed audits of 13.5 million square feet of institutional building space in the 1986 Texas Energy Cost Containment Program were $0.047/SF. The building area was 63 percent simple (offices, schools, and universities...

Heffington, W. M.; Lum, S. K.; Bauer, V. A.; Turner, W. D.

1987-01-01T23:59:59.000Z

228

Energy Storage Management for VG Integration (Presentation)  

SciTech Connect (OSTI)

This presentation describes how you economically manage integration costs of storage and variable generation.

Kirby, B.

2011-10-01T23:59:59.000Z

229

Societal lifetime cost of hydrogen fuel cell vehicles  

E-Print Network [OSTI]

Mass Production Cost Estimation for Direct H2 PEM Fuel CellCost Analysis of Fuel Cell Systems for Transportation - Compressed Hydrogen and PEM

Sun, Yongling; Ogden, J; Delucchi, Mark

2010-01-01T23:59:59.000Z

230

Directions in low-level radioactive waste management: A brief history of commercial low-level radioactive waste disposal  

SciTech Connect (OSTI)

This report presents a history of commercial low-level radioactive waste management in the United States, with emphasis on the history of six commercially operated low-level radioactive waste disposal facilities. The report includes a brief description of important steps that have been taken during the 1980s to ensure the safe disposal of low-level waste in the 1990s and beyond. These steps include the issuance of Title 10 Code of Federal Regulations Part 61, Licensing Requirements for the Land Disposal of Radioactive Waste, the Low-Level Radioactive Waste Policy Act of 1980, the Low-Level Radioactive Waste Policy Amendments Act of 1985, and steps taken by states and regional compacts to establish additional disposal sites. 42 refs., 13 figs., 1 tab.

Not Available

1990-10-01T23:59:59.000Z

231

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining% accuracy. ­ 2-5% of pre-production capital Types of Cost Estimates #12;3. Definitive ­ Based on definitive-even $ Production Level Fixed Cost Break-even $ Production Level Cost-Revenue Relationships · Capital Costs (or

Boisvert, Jeff

232

Energy Efficiency Improvement and Cost Saving Opportunities for the Fruit and Vegetable Processing Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

Ensuring proper refrigerant charge Efficient piping designGalitsky et al. 2005b). Ensuring proper refrigerant charge.Low refrigerant charge affects many small direct expansion

Masanet, Eric

2008-01-01T23:59:59.000Z

233

The Management of International Rivers as Demands Grow and Supplies Tighten: India, China, Nepal, Pakistan, Bangladesh  

E-Print Network [OSTI]

minimize the environmental costs) of water management, andspecifically on water management, with environmental issuespossible new water and environmental management initiatives

Crow, Ben; Singh, Nirvikar

2009-01-01T23:59:59.000Z

234

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

2001-06-01T23:59:59.000Z

235

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408-Revenue Relationships · Capital Costs (or first cost or capital investment): ­ Expenditures made to acquire or develop capital assets ­ Three main classes of capital costs: 1. Depreciable Investment: · Investment allocated

Boisvert, Jeff

236

Energy efficiency improvement and cost saving opportunities for the Corn Wet Milling Industry: An ENERGY STAR Guide for Energy and Plant Managers  

SciTech Connect (OSTI)

Corn wet milling is the most energy intensive industry within the food and kindred products group (SIC 20), using 15 percent of the energy in the entire food industry. After corn, energy is the second largest operating cost for corn wet millers in the United States. A typical corn wet milling plant in the United States spends approximately $20 to $30 million per year on energy, making energy efficiency improvement an important way to reduce costs and increase predictable earnings, especially in times of high energy-price volatility. This report shows energy efficiency opportunities available for wet corn millers. It begins with descriptions of the trends, structure and production of the corn wet milling industry and the energy used in the milling and refining process. Specific primary energy savings for each energy efficiency measure based on case studies of plants and references to technical literature are provided. If available, typical payback periods are also listed. The report draws upon the experiences of corn, wheat and other starch processing plants worldwide for energy efficiency measures. The findings suggest that given available resources and technology, there are opportunities to reduce energy consumption cost-effectively in the corn wet milling industry while maintaining the quality of the products manufactured. Further research on the economics of the measures, as well as the applicability of these to different wet milling practices, is needed to assess the feasibility of implementation of selected technologies at individual plants.

Galitsky, Christina; Worrell, Ernst; Ruth, Michael

2003-07-01T23:59:59.000Z

237

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network [OSTI]

Best Practices. Case Study–The Challenge: Improving Ventilation System Energy EfficiencyEnergy Efficiency & Renewable Energy (EERE), Office of Industrial Technologies. 2000. Best PracticesEnergy Efficiency Actions for Plant Personnel96   iii Appendix D: Assessing Energy Management Systems for Best Practices .

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

238

Computer Methods International Corp. (CMiC) is a software Development firm specializing in enterprise financial and cost management systems designed for the  

E-Print Network [OSTI]

and document required work effort to develop, test and implement new technical processes/changes · Create technical documentation of implementation activities for management and other team members · Test and debug program units in conjunction with other units and/or systems and integrate with other program modules

Ellis, Randy

239

ISU Sponsored Programs Costing Policy Iowa State University  

E-Print Network [OSTI]

what costs are allowable on federally funded grants, contracts and cooperative agreements (collectively). These federal regulations require that the same types of costs be treated consistently as either direct costs and various sponsor rules and regulations. II. Definitions Direct Costs OMB Circular A-21, Section D.1, states

Daniels, Thomas E.

240

Estimating Specialty Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

1997-03-28T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Cost reduction performance enhancements of multiple site cooling water systems, enabled by remote system monitoring/control and multifaceted data management  

SciTech Connect (OSTI)

An outsourced cooling water treatment automated control and data acquisition package, has been designed, installed, and commissioned in over 70 sites in North America and offshore. The standard package consists of a controller, sensors, human-machine interface software, data acquisition and management software, communications, and reporting. Significant challenges to applying this standard package in multiple sites arose from variations in cooling system design and makeup water quality as well as operations, environmental considerations, metrics, and language. A standard approach has met these challenges and overcome effects of downsizing through significant reduction in non-value-added, manual activities. Overall system reliability has been improved by migration to best practice throughout the organizations involved and immediate proactive response to out-of-specification conditions. This paper documents the evolution of a standard cooling water automation and data management package from its inception to current practice.

Cook, B. [BetzDearborn Water Management Group, Horsham, PA (United States); Young, D. [BetzDearborn Water Management Group, Mississauga, Ontario (Canada); Tari, K. [Praxair, Inc., Tonawanda, New York, NY (United States)

1998-12-31T23:59:59.000Z

242

Cost Efficient Datacenter Selection for Cloud Services  

E-Print Network [OSTI]

Cost Efficient Datacenter Selection for Cloud Services Hong Xu, Baochun Li henryxu, bli and performance. They need an effective way to direct the user requests to a suitable datacenter, in a cost efficient manner. Previ- ous work focused mostly on the electricity cost of datacenters. The approaches

Li, Baochun

243

Records Management Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order sets forth requirements and responsibilities for implementing and maintaining a cost-effective records management program throughout the Department of Energy.

2006-02-03T23:59:59.000Z

244

Developing prototype indicators of value and costs added through public involvement programs  

SciTech Connect (OSTI)

As more managers realize that public input in public sector decision making is a given in the current political and social climate, many are turning to public involvement (PI) as a way to manage the input so that it is beneficial to their decisions and projects. Public involvement is starting to become a familiar way of doing business for the Department of Energy (DOE) and its contractors. DOE and contractors are still unclear about the value and costs that PI can provide to their projects. Proponents claim that PI increases the acceptability of project goals by increasing stakeholders knowledge about and involvement in decisions of importance to them. In spite of these assertions avowing the benefits of PI, proponents have not generated methods that demonstrate or provide evidence of the value added through incorporating PI into projects. As DOE and contract managers are increasingly directed to incorporate public input in their project planning and decision making, questions are beginning to surface about the value and costs of PI as a way to manage that input. There is a pressing need to document the value and costs of PI for the participants in these processes--the stakeholders--and to present this information to decision makers in a way that helps them assess the value and costs of managing public input through a PI program. This research project focuses on developing a series of indicators to assess the value and costs of using public involvement programs to manage public input in decision making processes. The dimensions of public involvement that participants perceive as adding value or costs to projects; and developing ways to measure those dimensions through social indicators and metrics of behavior are outlined.

Lach, D.; Hixson, P.; Silbernagel, M.; Branch, K.; Heerwagen, J.; Bradbury, J.

1995-01-01T23:59:59.000Z

245

IT Project Manager  

Broader source: Energy.gov [DOE]

This position is located in the IT Project Management Office (JP). A successful candidate in this position will serve as an IT Program Manager and technical expert responsible for directly managing...

246

Economic Costs & Adaptations for Alternative Delta Regulations: Appendix F  

E-Print Network [OSTI]

Integrated water management: ­ Reservoir reoperation ­ Groundwater & conjunctive use ­ Water conservation conditions: Water deliveries and shortages Water scarcity costs Operating costs Mix of water management % Export Reduction %NoExportEconomicLoss #12;12 Ending Water Exports Water management adaptation Unfettered

Pasternack, Gregory B.

247

Employee Replacement Costs  

E-Print Network [OSTI]

Employee Replacement Costs Arindrajit Dube, Eric Freeman andproperties of employee replacement costs, using a panel2008. We establish that replacement costs are sub- stantial

Dube, Arindrajit; Freeman, Eric; Reich, Michael

2010-01-01T23:59:59.000Z

248

NREL Sheds Light on Integration Costs of Variable Generation and  

E-Print Network [OSTI]

, such as wind and solar energy, provide benefits such as reduced environmental impact, lack of fuel consumptionNREL Sheds Light on Integration Costs of Variable Generation and Cost-Causation Integration costs are generally manageable, but calculating costs is challenging. Renewable energy generation sources

249

Directives Tools  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Useful links and resources for Directives Writers, Directives Point of Contact (DPCs), Subject Matter Experts (SMEs), and Draft Directive Reviewers.

250

Supplemental report on cost estimates'  

SciTech Connect (OSTI)

The Office of Management and Budget (OMB) and the U.S. Army Corps of Engineers have completed an analysis of the Department of Energy's (DOE) Fiscal Year (FY) 1993 budget request for its Environmental Restoration and Waste Management (ERWM) program. The results were presented to an interagency review group (IAG) of senior-Administration officials for their consideration in the budget process. This analysis included evaluations of the underlying legal requirements and cost estimates on which the ERWM budget request was based. The major conclusions are contained in a separate report entitled, ''Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program.'' This Corps supplemental report provides greater detail on the cost analysis.

NONE

1992-04-29T23:59:59.000Z

251

Analytic framework for TRL-based cost and schedule models  

E-Print Network [OSTI]

Many government agencies have adopted the Technology Readiness Level (TRL) scale to help improve technology development management under ever increasing cost, schedule, and complexity constraints. Many TRL-based cost and ...

El-Khoury, Bernard

2012-01-01T23:59:59.000Z

252

Profit Centers, Single-Source Suppliers and Transaction Costs  

E-Print Network [OSTI]

This paper addresses criticisms of transaction-cost theory that it overstates the effect of asset specialization on vertical integration and understates the costs of managing interunit relationships within an organization, ...

Walker, Gordon; Poppo, Laura

1991-03-01T23:59:59.000Z

253

Novel Low Cost, High Reliability Wind Turbine Drivetrain  

SciTech Connect (OSTI)

Clipper Windpower, in collaboration with United Technologies Research Center, the National Renewable Energy Laboratory, and Hamilton Sundstrand Corporation, developed a low-cost, deflection-compliant, reliable, and serviceable chain drive speed increaser. This chain and sprocket drivetrain design offers significant breakthroughs in the areas of cost and serviceability and addresses the key challenges of current geared and direct-drive systems. The use of gearboxes has proven to be challenging; the large torques and bending loads associated with use in large multi-MW wind applications have generally limited demonstrated lifetime to 8-10 years [1]. The large cost of gearbox replacement and the required use of large, expensive cranes can result in gearbox replacement costs on the order of $1M, representing a significant impact to overall cost of energy (COE). Direct-drive machines eliminate the gearbox, thereby targeting increased reliability and reduced life-cycle cost. However, the slow rotational speeds require very large and costly generators, which also typically have an undesirable dependence on expensive rare-earth magnet materials and large structural penalties for precise air gap control. The cost of rare-earth materials has increased 20X in the last 8 years representing a key risk to ever realizing the promised cost of energy reductions from direct-drive generators. A common challenge to both geared and direct drive architectures is a limited ability to manage input shaft deflections. The proposed Clipper drivetrain is deflection-compliant, insulating later drivetrain stages and generators from off-axis loads. The system is modular, allowing for all key parts to be removed and replaced without the use of a high capacity crane. Finally, the technology modularity allows for scalability and many possible drivetrain topologies. These benefits enable reductions in drivetrain capital cost by 10.0%, levelized replacement and O&M costs by 26.7%, and overall cost of energy by 10.2%. This design was achieved by: (1) performing an extensive optimization study that deter-mined the preliminary cost for all practical chain drive topologies to ensure the most competitive configuration; (2) conducting detailed analysis of chain dynamics, contact stresses, and wear and efficiency characteristics over the chain�������¢����������������s life to ensure accurate physics-based predictions of chain performance; and (3) developing a final product design, including reliability analysis, chain replacement procedures, and bearing and sprocket analysis. Definition of this final product configuration was used to develop refined cost of energy estimates. Finally, key system risks for the chain drive were defined and a comprehensive risk reduction plan was created for execution in Phase 2.

Anthony Chobot; Debarshi Das; Tyler Mayer; Zach Markey; Tim Martinson; Hayden Reeve; Paul Attridge; Tahany El-Wardany

2012-09-13T23:59:59.000Z

254

Multiperiod Portfolio Optimization with General Transaction Costs  

E-Print Network [OSTI]

Department of Management Science and Operations, London Business School, ... For market impact costs, we show that the optimal portfolio policy at each ... Markowitz's analysis are that the investor only cares about single-period ... The case with a single-risky asset and proportional transaction costs is well understood.

2013-07-17T23:59:59.000Z

255

Cost Analysis of Fuel Cell Systems for Transportation Compressed Hydrogen and PEM Fuel Cell System  

SciTech Connect (OSTI)

PEMFC technology for transportation must be competitive with internal combustion engine powertrains in a number of key metrics, including performance, life, reliability, and cost. Demonstration of PEMFC cost competitiveness has its own challenges because the technology has not been applied to high volume automotive markets. The key stack materials including membranes, electrodes, bipolar plates, and gas diffusion layers have not been produced in automotive volumes to the exacting quality requirements that will be needed for high stack yields and to the evolving property specifications of high performance automotive stacks. Additionally, balance-of-plant components for air, water, and thermal management are being developed to meet the unique requirements of fuel cell systems. To address the question of whether fuel cells will be cost competitive in automotive markets, the DOE has funded this project to assess the high volume production cost of PEM fuel cell systems. In this report a historical perspective of our efforts in assessment of PEMFC cost for DOE is provided along with a more in-depth assessment of the cost of compressed hydrogen storage is provided. Additionally, the hydrogen storage costs were incorporated into a system cost update for 2004. Assessment of cost involves understanding not only material and production costs, but also critical performance metrics, i.e., stack power density and associated catalyst loadings that scale the system components. We will discuss the factors influencing the selection of the system specification (i.e., efficiency, reformate versus direct hydrogen, and power output) and how these have evolved over time. The reported costs reflect internal estimates and feedback from component developers and the car companies. Uncertainty in the cost projection was addressed through sensitivity analyses.

Eric J. Carlson

2004-10-20T23:59:59.000Z

256

Guidelines for Engineering, Design, and Inspection Costs - DOE...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5, Guidelines for Engineering, Design, and Inspection Costs by John Makepeace Functional areas: Construction and Engineering, Project Management Engineering, design, and inspection...

257

Energy Smart Guide to Campus Cost Savings: Executive Summary  

SciTech Connect (OSTI)

Summary of The Energy Smart Guide to Campus Cost Savings, an energy efficiency guidebook for College and University business and facility managers.

Not Available

2003-07-01T23:59:59.000Z

258

Cost Accounting System for fusion studies  

SciTech Connect (OSTI)

A Cost Accounting System that is applicable to all magnetic fusion reactor design studies has been developed. This system provides: (1) definitions of the elements of cost and methods for the combination of these elements to form a cost estimate; (2) a Code of Accounts that uses a functional arrangement for identification of the plant components; and (3) definitions and methods to analyze actual cost data so that the data can be directly reported into this Cost Accounting System. The purpose of the Cost Accounting System is to provide the structure for the development of a fusion cost data base and for the development of validated cost estimating procedures. This system has been developed through use at the Fusion Engineering Design Center (FEDC) and has been applied to different confinement concepts (tokamaks and tandem mirrors) and to different types of projects (experimental devices and commercial power plants). The use of this Cost Accounting System by all magnetic fusion projects will promote the development of a common cost data base, allow the direct comparison of cost estimates, and ultimately establish the cost credibility of the program.

Hamilton, W.R.; Keeton, D.C.; Thomson, S.L.

1985-12-01T23:59:59.000Z

259

Network Management Network Management  

E-Print Network [OSTI]

depending on ­ Equipment costs (CAPEX, Capital Expenditures) · Amortized over several years ­ Costs

260

Preliminary Evaluation of Load Management for Electricity End Users  

E-Print Network [OSTI]

The planning, design and implementation of load management is complex and expensive. The results of a load management program are subject to numerous uncertainties related to load characteristics, power cost savings, load management costs...

Collier, S. E.

1984-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Delegation Procedures - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Directives Program Management Camille...

262

COST 4138/10 1 European Cooperation  

E-Print Network [OSTI]

: Pathway Evaluation and pest Risk Management In Transport - PERMIT Delegations will find attached AND PEST RISK MANAGEMENT IN TRANSPORT - PERMIT The Parties to this Memorandum of Understanding, declaring. The COST Action PERMIT addresses this shortfall in knowledge and practice and will focus on reducing

263

Cost Model and Cost Estimating Software  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

1997-03-28T23:59:59.000Z

264

Defense waste transportation: cost and logistics studies  

SciTech Connect (OSTI)

Transportation of nuclear wastes from defense programs is expected to significantly increase in the 1980s and 1990s as permanent waste disposal facilities come into operation. This report uses models of the defense waste transportation system to quantify potential transportation requirements for treated and untreated contact-handled transuranic (CH-TRU) wastes and high-level defense wastes (HLDW). Alternative waste management strategies in repository siting, waste retrieval and treatment, treatment facility siting, waste packaging and transportation system configurations were examined to determine their effect on transportation cost and hardware requirements. All cost estimates used 1980 costs. No adjustments were made for future changes in these costs relative to inflation. All costs are reported in 1980 dollars. If a single repository is used for defense wastes, transportation costs for CH-TRU waste currently in surface storage and similar wastes expected to be generated by the year 2000 were estimated to be 109 million dollars. Recovery and transport of the larger buried volumes of CH-TRU waste will increase CH-TRU waste transportation costs by a factor of 70. Emphasis of truck transportation and siting of multiple repositories would reduce CH-TRU transportation costs. Transportation of HLDW to repositories for 25 years beginning in 1997 is estimated to cost $229 M in 1980 costs and dollars. HLDW transportation costs could either increase or decrease with the selection of a final canister configuration. HLDW transportation costs are reduced when multiple repositories exist and emphasis is placed on truck transport.

Andrews, W.B.; Cole, B.M.; Engel, R.L.; Oylear, J.M.

1982-08-01T23:59:59.000Z

265

Management issues in automated audit analysis  

SciTech Connect (OSTI)

This paper discusses management issues associated with the design and implementation of an automated audit analysis system that we use to detect security events. It gives the viewpoint of a team directly responsible for developing and managing such a system. We use Los Alamos National Laboratory`s Network Anomaly Detection and Intrusion Reporter (NADIR) as a case in point. We examine issues encountered at Los Alamos, detail our solutions to them, and where appropriate suggest general solutions. After providing an introduction to NADIR, we explore four general management issues: cost-benefit questions, privacy considerations, legal issues, and system integrity. Our experiences are of general interest both to security professionals and to anyone who may wish to implement a similar system. While NADIR investigates security events, the methods used and the management issues are potentially applicable to a broad range of complex systems. These include those used to audit credit card transactions, medical care payments, and procurement systems.

Jackson, K.A.; Hochberg, J.G.; Wilhelmy, S.K.; McClary, J.F.; Christoph, G.G.

1994-03-01T23:59:59.000Z

266

Depleted uranium management alternatives  

SciTech Connect (OSTI)

This report evaluates two management alternatives for Department of Energy depleted uranium: continued storage as uranium hexafluoride, and conversion to uranium metal and fabrication to shielding for spent nuclear fuel containers. The results will be used to compare the costs with other alternatives, such as disposal. Cost estimates for the continued storage alternative are based on a life-cycle of 27 years through the year 2020. Cost estimates for the recycle alternative are based on existing conversion process costs and Capital costs for fabricating the containers. Additionally, the recycle alternative accounts for costs associated with intermediate product resale and secondary waste disposal for materials generated during the conversion process.

Hertzler, T.J.; Nishimoto, D.D.

1994-08-01T23:59:59.000Z

267

Evaporative Roof Cooling- A Simple Solution to Cut Cooling Costs  

E-Print Network [OSTI]

Since the “Energy Crisis” Evaporative Roof Cooling Systems have gained increased acceptance as a cost effective method to reduce the high cost of air conditioning. Documented case histories in retro-fit installations show direct energy savings...

Abernethy, D.

268

Evaporative Roof Cooling - A Simple Solution to Cut Cooling Costs  

E-Print Network [OSTI]

Since the "Energy Crisis" Evaporative Roof Cooling Systems have gained increased acceptance as a cost effective method to reduce the high cost of air conditioning. Documented case histories in retrofit installations show direct energy savings...

Abernethy, D.

1985-01-01T23:59:59.000Z

269

Updating Texas Energy Cost Containment Audit Reports  

E-Print Network [OSTI]

In 1984 and 1986, 35.3 million square feet of state owned buildings were audited to identify cost saving retrofit projects. Originally intended for direct legislative funding or bond sales, funding became available in 1989 through oil overcharge...

Burke, T. E.; Heffington, W. M.

1989-01-01T23:59:59.000Z

270

Directed Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directed Energy The Directed Energy Program provides laser systems design, engineering and production for specific applications and missions, experimentally validated...

271

Activity Based Costing  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

1997-03-28T23:59:59.000Z

272

Cost of presumptive source term Remedial Actions Laboratory for energy-related health research, University of California, Davis  

SciTech Connect (OSTI)

A Remedial Investigation/Feasibility Study (RI/FS) is in progress at the Laboratory for Energy Related Health Research (LEHR) at the University of California, Davis. The purpose of the RI/FS is to gather sufficient information to support an informed risk management decision regarding the most appropriate remedial actions for impacted areas of the facility. In an effort to expedite remediation of the LEHR facility, the remedial project managers requested a more detailed evaluation of a selected set of remedial actions. In particular, they requested information on both characterization and remedial action costs. The US Department of Energy -- Oakland Office requested the assistance of the Pacific Northwest National Laboratory to prepare order-of-magnitude cost estimates for presumptive remedial actions being considered for the five source term operable units. The cost estimates presented in this report include characterization costs, capital costs, and annual operation and maintenance (O&M) costs. These cost estimates are intended to aid planning and direction of future environmental remediation efforts.

Last, G.V.; Bagaasen, L.M.; Josephson, G.B.; Lanigan, D.C.; Liikala, T.L.; Newcomer, D.R.; Pearson, A.W.; Teel, S.S.

1995-12-01T23:59:59.000Z

273

Pollution prevention cost savings potential  

SciTech Connect (OSTI)

The waste generated by DOE facilities is a serious problem that significantly impacts current operations, increases future waste management costs, and creates future environmental liabilities. Pollution Prevention (P2) emphasizes source reduction through improved manufacturing and process control technologies. This concept must be incorporated into DOE`s overall operating philosophy and should be an integral part of Total Quality Management (TQM) program. P2 reduces the amount of waste generated, the cost of environmental compliance and future liabilities, waste treatment, and transportation and disposal costs. To be effective, P2 must contribute to the bottom fine in reducing the cost of work performed. P2 activities at LLNL include: researching and developing innovative manufacturing; evaluating new technologies, products, and chemistries; using alternative cleaning and sensor technologies; performing Pollution Prevention Opportunity Assessments (PPOAs); and developing outreach programs with small business. Examples of industrial outreach are: innovative electroplating operations, printed circuit board manufacturing, and painting operations. LLNL can provide the infrastructure and technical expertise to address a wide variety of industrial concerns.

Celeste, J.

1994-12-01T23:59:59.000Z

274

Managing Overloaded Hosts for Dynamic Consolidation of Virtual Machines in Cloud Data  

E-Print Network [OSTI]

maintenance costs, or imple- ment a private cloud data center to improve the resource management of virtual machines (VMs) is an effective way to improve the utilization of resources and energy efficiency of dynamic VM consolidation that directly influences the resource utilization and quality of service (Qo

Melbourne, University of

275

Types of Cost Estimates  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The chapter describes the estimates required on government-managed projects for both general construction and environmental management.

1997-03-28T23:59:59.000Z

276

Advanced Gasoline Turbocharged Direct Injection (GTDI) Engine...  

Broader source: Energy.gov (indexed) [DOE]

in Gasoline Turbocharged Direct Injection (GTDI) engine technology in the near term as a cost effective, high volume, fuel economy solution, marketed globally as EcoBoost...

277

Calculating Costs for Quality of Security Service Evdoxia Spyropoulou  

E-Print Network [OSTI]

utilization costs. The estimated costs can be fed into a resource management system to facilitate the process the design of the QoSS costing demonstration, which we believe is suitable for incorporation into a resource resource availability. As part of the process of estimating efficient task schedules, the RMS must balance

278

Time Horizons of Environmental vs. Non-Environmental Costs  

E-Print Network [OSTI]

the financial impacts of environment- related costs and benefits is increasing as environmental management ac to measure than financial impacts, EMA is increasingly allowing the financial impact of environmental costs1 1 #12;Time Horizons of Environmental vs. Non-Environmental Costs: Evidence from U.S. Tort

Tovey, Craig A.

279

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

280

The LAndscape Management Policy Simulator (LAMPS)  

E-Print Network [OSTI]

Considerations Riparian Management Choices Leave Tree Strategies Transition Probabilities Stochastic EventsThe LAndscape Management Policy Simulator (LAMPS) Pete Bettinger Department of Forest Resources Management intentions Prices and costs GIS databases Land use pattern Land use change Stand structure

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Clemson University Construction Science and Management BS  

E-Print Network [OSTI]

shall be able to describe practices of effective management of personnel, materials, equipment, costsClemson University Construction Science and Management BS 2011 ­ 2012 Outcome Assessment Plan Mission / Purpose - The mission of the Department of Construction Science and Management undergraduate

Bolding, M. Chad

282

Network Management Network Management  

E-Print Network [OSTI]

: is it important? · Cost are essentially depending on ­ Equipment costs (CAPEX, Capital Expenditures) · Amortized

283

Development of Cost-Competitive Advanced Thermoelectric Generators...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Advanced Thermoelectric Generators for Direct Conversion of Vehicle Waste Heat into Useful Electrical Power Development of Cost-Competitive Advanced Thermoelectric...

284

Environmental management activities  

SciTech Connect (OSTI)

The Office of Environmental Management (EM) has been delegated the responsibility for the Department of Energy`s (DOE`s) cleanup of the nuclear weapons complex. The nature and magnitude of the waste management and environmental remediation problem requires the identification of technologies and scientific expertise from domestic and foreign sources. Within the United States, operational DOE facilities, as well as the decontamination and decommissioning of inactive facilities, have produced significant amounts of radioactive, hazardous, and mixed wastes. In order to ensure worker safety and the protection of the public, DOE must: (1) assess, remediate, and monitor sites and facilities; (2) store, treat, and dispose of wastes from past and current operations; and (3) develop and implement innovative technologies for environmental restoration and waste management. The EM directive necessitates looking beyond domestic capabilities to technological solutions found outside US borders. Following the collapse of the Soviet regime, formerly restricted elite Soviet scientific expertise became available to the West. EM has established a cooperative technology development program with Russian scientific institutes that meets domestic cleanup objectives by: (1) identifying and accessing Russian EM-related technologies, thereby leveraging investments and providing cost-savings; (2) improving access to technical information, scientific expertise, and technologies applicable to EM needs; and (3) increasing US private sector opportunities in Russian in EM-related areas.

NONE

1997-07-01T23:59:59.000Z

285

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

2012-12-03T23:59:59.000Z

286

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

2012-12-03T23:59:59.000Z

287

Contracting with reading costs and renegotiation costs  

E-Print Network [OSTI]

OF CALIFORNIA, SAN DIEGO Contracting with Reading Costs andrents, and the competitive contracting process. Journal ofReiche. Foundation of incomplete contracting in a model of

Brennan, James R.

2007-01-01T23:59:59.000Z

288

Systems Engineering Cost Estimation  

E-Print Network [OSTI]

on project, human capital impact. 7 How to estimate Cost? Difficult to know what we are building early on1 Systems Engineering Lecture 3 Cost Estimation Dr. Joanna Bryson Dr. Leon Watts University of Bath: Contrast approaches for estimating software project cost, and identify the main sources of cost

Bryson, Joanna J.

289

Life Cycle Cost Estimate  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

1997-03-28T23:59:59.000Z

290

Cost Estimation Package  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

1997-03-28T23:59:59.000Z

291

OOTW COST TOOLS  

SciTech Connect (OSTI)

This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

HARTLEY, D.S.III; PACKARD, S.L.

1998-09-01T23:59:59.000Z

292

A scoping study on the costs of indoor air quality illnesses:an insurance loss reduction perspective  

SciTech Connect (OSTI)

The incidence of commercial buildings with poor indoor air quality (IAQ), and the frequency of litigation over the effects of poor IAQ is increasing. If so, these increases have ramifications for insurance carriers, which pay for many of the costs of health care and general commercial liability. However, little is known about the actual costs to insurance companies from poor IAQ in buildings. This paper reports on the results of a literature search of buildings-related, business and legal databases, and interviews with insurance and risk management representatives aimed at finding information on the direct costs to the insurance industry of poor building IAQ, as well as the costs of litigation. The literature search and discussions with insurance and risk management professionals reported in this paper turned up little specific information about the costs of IAQ-related problems to insurance companies. However, those discussions and certain articles in the insurance industry press indicate that there is a strong awareness and growing concern over the "silent crisis" of IAQ and its potential to cause large industry losses, and that a few companies are taking steps to address this issue. The source of these losses include both direct costs to insurers from paying health insurance and professional liability claims, as weIl as the cost of litigation. In spite of the lack of data on how IAQ-related health problems affect their business, the insurance industry has taken the anecdotal evidence about their reality seriously enough to alter their policies in ways that have lessened their exposure. We conclude by briefly discussing four activities that need to be addressed in the near future: (1) quantifying IAQ-related insurance costs by sector, (2) educating the insurance industry about the importance of IAQ issues, (3) examining IAQ impacts on the insurance industry in the residential sector, and (4) evaluating the relationship between IAQ improvements and their impact on energy use.

Chen, Allan; Vine, Edward L.

1998-08-31T23:59:59.000Z

293

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

Elec Del Cali: Del Investment Cost Delivery Cost OperatingCost Feedstock Cost Investment Cost Delivery Cost Operatingcosts Annualized investment cost, 1000$/yr Total annualized

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

294

Parallel integrated thermal management  

DOE Patents [OSTI]

Embodiments discussed herein are directed to managing the heat content of two vehicle subsystems through a single coolant loop having parallel branches for each subsystem.

Bennion, Kevin; Thornton, Matthew

2014-08-19T23:59:59.000Z

295

ORISE: Emergency Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

provided direction and experienced leadership to the Federal Bureau of Investigation's (FBI) Crisis Management Unit to establish a standardized exercise program for the FBI that...

296

International Commitments Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Order establishes a process to manage the Department's International Commitments under the administrative direction of the Office of Policy and International Affairs. No cancellation.

2008-11-18T23:59:59.000Z

297

The Management of International Rivers as Demands Grow and Supplies Tighten: India, China, Nepal, Pakistan, Bangladesh  

E-Print Network [OSTI]

possible new water and environmental management initiativesminimize the environmental costs) of water management, andenvironmental issues, the focus of the proposed body would be specifically on water management,

Crow, Ben; Singh, Nirvikar

2009-01-01T23:59:59.000Z

298

Resources for Fleet Managers  

Broader source: Energy.gov [DOE]

Fleet managers will benefit from the lower fuel costs, more reliable fuel prices, and lower emissions that come from using alternative fuels and advanced technologies made possible through the work...

299

Unconventional Staging Package Selection Leads to Cost Savings  

SciTech Connect (OSTI)

In late 2010, U.S. Department of Energy (DOE) Deputy Secretary of Energy, Daniel Poneman, directed that an analysis be conducted on the U-233 steel-clad, Zero Power Reactor (ZPR) fuel plates that were stored at Oak Ridge National Laboratory (ORNL), focusing on cost savings and any potential DOE programmatic needs for the special nuclear material (SNM). The NA-162 Nuclear Criticality Safety Program requested retention of these fuel plates for use in experiments at the Nevada National Security Site (NNSS). A Secretarial Initiative challenged ORNL to make the first shipment to the NNSS by the end of the 2011 calendar year, and this effort became known as the U-233 Project Accelerated Shipping Campaign. To meet the Secretarial Initiative, National Security Technologies, LLC (NSTec), the NNSS Management and Operations contractor, was asked to facilitate the receipt and staging of the U-233 fuel plates in the Device Assembly Facility (DAF). Because there were insufficient staging containers available for the fuel plates, NSTec conducted an analysis of alternatives. The project required a staging method that would reduce the staging footprint while addressing nuclear criticality safety and radiation exposure concerns. To accommodate an intermediate staging method of approximately five years, the NSTec project team determined that a unique and unconventional staging package, the AT-400R, was available to meet the project requirements. By using the AT-400R containers, NSTec was able to realize a cost savings of approximately $10K per container, a total cost savings of nearly $450K.

,

2012-06-07T23:59:59.000Z

300

Increase Productivity - Implement Energy Management Systems with Project Management Techniques  

E-Print Network [OSTI]

Engineering Manager of this small but active division, I devote a big part of my time on justifying energy expenditures and the means to reduce these costs. Ten years ago energy costs were one tenth of today's costs and just about three percent of the division...

Spinner, M. P.

1984-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Evidence of cost growth under cost-plus and fixed-price contracting  

SciTech Connect (OSTI)

As defined by the US Department of Energy (DOE), privatization refers to a shifting of responsibilities for the completion of projects from a cost-plus Management and Operations (M and O) contract, to incentive-based contracts with the private sector. DOE`s new vision is to arrange cleanup work around incentives-based contracts, which are won via competitive bidding. Competition in awarding cleanup contracts can make use of market incentives to lower project costs and reduce slippage time. Fixed-price contracts encourage contractors to minimize schedule delays and cost overruns once the scope of a project has been negotiated. Conversely, cost-plus contracting offers weak incentives for contractors to select cost-minimizing production and management approaches. Because privatization explicitly allocates more risk to the contractor, it forces the government to better define its goals and methods. This study summarizes actual cost experiences with government contracts performed under cost-plus and fixed-price incentive structures at all levels of government. The first section provides some background on the problem of making contractor activity more cost-efficient. Following this are sections on the measurement of performance and the costs of projects, limitations on measurement, and findings of similar studies. The study concludes with appendices discussing the details of the performance measurement methodology and the project data sets used in the study.

Scott, M.J.; Paananaen, O.H.; Redgate, T.E.; Ulibarri, C.A.; Jaksch, J.A.

1998-09-01T23:59:59.000Z

302

Report on the Savannah River Site aluminum-based spent nuclear fuel alternatives cost study  

SciTech Connect (OSTI)

Initial estimates of costs for the interim management and disposal of aluminum-based spent nuclear fuel (SNF) were developed during preparation of the Environmental Impact Statement (EIS) on the Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel. The Task Team evaluated multiple alternatives, assessing programmatic, technical, and schedule risks, and generated life-cycle cost projections for each alternative. The eight technology alternatives evaluated were: direct co-disposal; melt and dilute; reprocessing; press and dilute; glass material oxidation dissolution system (GMODS); electrometallurgical treatment; dissolve and vitrify; and plasma arc. In followup to the Business Plan that was developed to look at SNF dry storage, WSRC prepared an addendum to the cost study. This addendum estimated the costs for the modification and use of an existing (105L) reactor facility versus a greenfield approach for new facilities (for the Direct Co-Disposal and Melt and Dilute alternatives). WSRC assessed the impacts of a delay in reprocessing due to the potential reservation of H-Canyon for other missions (i.e., down blending HEU for commercial use or the conversion of plutonium to either MOX fuel or an immobilized repository disposal form). This report presents the relevant results from these WSRC cost studies, consistent with the most recent project policy, technology implementation, canyon utilization, and inventory assumptions. As this is a summary report, detailed information on the technical alternatives or the cost assumptions raised in each of the above-mentioned cost studies is not provided. A comparison table that briefly describes the bases used for the WSRC analyses is included as Appendix A.

NONE

1998-12-01T23:59:59.000Z

303

Environmental Cost Analysis  

E-Print Network [OSTI]

Environmental Cost Analysis David Edge Texas Natural Resource Conservation Commission 131 ESL-IE-00-04-21 Proceedings from the Twenty-second National Industrial Energy Technology Conference, Houston, TX, April 5-6, 2000 Tuas Natural... Resource Conservation CorDDliuion Environmental Cost Analysis Presented By David Edge Determine the Costs c> Input co Output c> Hidden c> Capital (non recurring) Envirormenlal Cost Analy.;is "There has to be a measurable result...

Edge, D.

304

Example of Environmental Restoration Code of Accounts - DOE Directives...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

describes the Level 1 cost codes, and lists the Level 2 and Level 3 cost codes. g4301-1chp17.pdf -- PDF Document, 12 KB Writer: John Makepeace Subjects: Administration Management...

305

Power Plant Cycling Costs  

SciTech Connect (OSTI)

This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

2012-07-01T23:59:59.000Z

306

1998 Environmental Management Science Program Annual Report  

SciTech Connect (OSTI)

The Environmental Management Science Program (EMSP) is a collaborative partnership between the DOE Office of Environmental Management (EM), Office of Science (DOE-SC), and the Idaho Operations Office (DOE-ID) to sponsor basic environmental and waste management related research. Results are expected to lead to reduction of the costs, schedule, and risks associated with cleaning up the nation's nuclear complex. The EMSP research portfolio addresses the most challenging technical problems of the EM program related to high level waste, spent nuclear fuel, mixed waste, nuclear materials, remedial action, decontamination and decommissioning, and health, ecology, or risk. The EMSP was established in response to a mandate from Congress in the fiscal year 1996 Energy and Water Development Appropriations Act. Congress directed the Department to ''provide sufficient attention and resources to longer-term basic science research which needs to be done to ultimately reduce cleanup costs, develop a program that takes advantage of laboratory and university expertise, and seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective''. This mandate followed similar recommendations from the Galvin Commission to the Secretary of Energy Advisory Board. The EMSP also responds to needs identified by National Academy of Sciences experts, regulators, citizen advisory groups, and other stakeholders.

None

1999-03-01T23:59:59.000Z

307

Smart Energy Management of Multiple Full Cell Powered Applications  

SciTech Connect (OSTI)

In this research project the University of South Alabama research team has been investigating smart energy management and control of multiple fuel cell power sources when subjected to varying demands of electrical and thermal loads together with demands of hydrogen production. This research has focused on finding the optimal schedule of the multiple fuel cell power plants in terms of electric, thermal and hydrogen energy. The optimal schedule is expected to yield the lowest operating cost. Our team is also investigating the possibility of generating hydrogen using photoelectrochemical (PEC) solar cells through finding materials for efficient light harvesting photoanodes. The goal is to develop an efficient and cost effective PEC solar cell system for direct electrolysis of water. In addition, models for hydrogen production, purification, and storage will be developed. The results obtained and the data collected will be then used to develop a smart energy management algorithm whose function is to maximize energy conservation within a managed set of appliances, thereby lowering O/M costs of the Fuel Cell power plant (FCPP), and allowing more hydrogen generation opportunities. The Smart Energy Management and Control (SEMaC) software, developed earlier, controls electrical loads in an individual home to achieve load management objectives such that the total power consumption of a typical residential home remains below the available power generated from a fuel cell. In this project, the research team will leverage the SEMaC algorithm developed earlier to create a neighborhood level control system.

Mohammad S. Alam

2007-04-23T23:59:59.000Z

308

Managing Critical Management Improvement Initiatives  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Provides requirements and responsibilities for planning, executing and assessing critical management improvement initiatives within DOE. DOE N 251.59, dated 9/27/2004, extends this Notice until 10/01/2005. Archived 11-8-10. Does not cancel other directives.

2003-10-01T23:59:59.000Z

309

Cost effective lighting  

SciTech Connect (OSTI)

Long-life replacement lamps for the incandescent lamp have been evaluated with regard to their cost effectiveness. The replacements include the use of energy buttons that extend lamp life as well as an adaptive fluorescent circline lamp that will fit into existing incandescent lamp sockets. The initial, operating, and replacement costs for one million lumen-hours are determined for each lamp system. We find the most important lighting cost component is the operating cost. Using lamps that are less efficient or devices that cause lamps to operate less efficiently are not cost-effective. The adaptive fluorescent circline lamp, even at an initial cost of $15.00, is the most cost effective source of illumination compared to the incandescent lamp and lamp systems examined. 3 refs., 6 tabs.

Morse, O.; Verderber, R.

1987-07-01T23:59:59.000Z

310

IRO INTERNAL MANAGEMENT Funded by the  

E-Print Network [OSTI]

Management · OGPI approach · Information and Management Systems #12;· The analysis will be focus "tools" that improve the quality of the costs management: The Economic Management Tool (IntranetIRO INTERNAL MANAGEMENT - UA - Funded by the European Union 3rd Workshop: IROs Models Tunisia, 30

311

The Mixed Waste Management Facility monthly report, December 1994  

SciTech Connect (OSTI)

This report contains cost and planning schedules, and detailed information on project management at the LLNL facility.

Streit, R.

1995-01-01T23:59:59.000Z

312

Energy and Demand Savings from Implementation Costs in Industrial Facilities  

E-Print Network [OSTI]

1 ENERGY AND DEMAND SAVINGS FROM IMPLEMENTATION COSTS IN INDUSTRIAL FACILITIES 1 Razinha, J.A. and Heffington, W.M. Industrial Assessment Center and Mechanical Engineering Department Texas A&M University, College Station, Texas 77843.... noted that a direct calculation of cost savings from the implementation cost could eliminate as much as 30% of the preparation time (and associated cost) for the LoanSTAR reports. The savings result from not having to calculate energy or demand...

Razinha, J. A.; Heffington, W. M.

313

Direct from CDC Environmental Health  

E-Print Network [OSTI]

environmental health services (i.e., services involving water quality, air quality, waste management, or vector management plans of water supply systems. The team also works on sustainability evalu ation and sanitationDirect from CDC Environmental Health Services Branch Editor's note: NEHA strives to provide up

314

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

315

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network [OSTI]

Costs Annualized Investment Cost, 1000$/yr Total AnnualizedH2 Fueling Stations Investment Cost Cost ($/yr) OperatingH2 Fueling Stations Investment Cost Cost ($/kg) Operating

Weinert, Jonathan X.; Shaojun, Liu; Ogden, J; Jianxin, Ma

2006-01-01T23:59:59.000Z

316

Cost Estimating Handbook for Environmental Restoration  

SciTech Connect (OSTI)

Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

NONE

1990-09-01T23:59:59.000Z

317

Project Controls - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

description of project controls and the role the cost estimation package plays. g4301-1chp14.pdf -- PDF Document, 6 KB Writer: John Makepeace Subjects: Administration Management...

318

IM-GEO: Impact of R and D on cost of geothermal power: Documentation of Model Version 2. 09  

SciTech Connect (OSTI)

IM-GEO is an analysis used to estimate the impact of technology improvements on the relative cost of hydrothermal power. The analysis is available in a tutorial program for use on personal computers. It is designed for use by R and D program managers to evaluate R and D options. Only the potential impact of technologies is considered with all economic factors being held constant. This analysis has one unique feature. The economic impact of reducing risk by improving reservoir characterization is included using a strategy currently employed by financial institutions. This report describes the basis of the calculations, documents the code, and describes the operational procedures. Application of the code to study potential cost reductions due to R and D success will be done by R and D managers to evaluate and direct their own programs.

Petty, S.; Entingh, D.; Livesay, B.J.

1988-02-01T23:59:59.000Z

319

Pension costs and liabilities  

E-Print Network [OSTI]

be to charge the cost over the current and subsequent years on the assumption that the cost, even though measured by past services, is incurred in contemplation of present and future 1 services. 1'he development of accounting thought concerning retire...? present liabilities are under- stated and owner's equity is overstated by a corresponding amount. It seems, however, that charging retained earnings with the past service cost does not, represent the true picture. Pension payments based solely on past...

Courtney, Harley Macon

1961-01-01T23:59:59.000Z

320

LMFBR fuel component costs  

SciTech Connect (OSTI)

A significant portion of the cost of fabricating LMFBR fuels is in the non-fuel components such as fuel pin cladding, fuel assembly ducts and end fittings. The contribution of these to fuel fabrication costs, based on FFTF experience and extrapolated to large LMFBR fuel loadings, is discussed. The extrapolation considers the expected effects of LMFBR development programs in progress on non-fuel component costs.

Epperson, E.M.; Borisch, R.R.; Rice, L.H.

1981-10-29T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Report of the Finance Cost Reduction Working Group to the Federal ESPC Steering Committee  

E-Print Network [OSTI]

Report of the Finance Cost Reduction Working Group to the Federal ESPC Steering Committee Reducing Financing Costs for Federal ESPCs Federal Energy Management Program Energy Savings Performance Contracting 2. REQUIREMENTS FOR COMPETITIVE FINANCING ACQUISITION .................................7 2.1 Use

Oak Ridge National Laboratory

322

Total Cost Per MwH for all common large scale power generation...  

Open Energy Info (EERE)

or ash heap, the cost of the gas out of the stack, toxificaiton of the lakes and streams, plant decommision costs. For nuclear yiou are talking about managing the waste in...

323

Directives System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Department of Energy (DOE) Directives System is the means by which DOE policies, requirements, and responsibilities are developed and communicated throughout the Department. Directives are used to inform, direct, and guide employees in the performance of their jobs, and to enable employees to work effectively within the Department and with agencies, contractors, and the public. Cancels: DOE O 251.1, DOE M 251.1-1

1998-01-30T23:59:59.000Z

324

Benefit-cost assessment of aviation environmental policies  

E-Print Network [OSTI]

This thesis aids in the development of a framework in which to conduct global benefit-cost assessments of aviation policies. Current policy analysis tools, such as the aviation environmental portfolio management tool (APMT), ...

Gilmore, Christopher K. (Christopher Kenneth)

2012-01-01T23:59:59.000Z

325

Hydrogen and Infrastructure Costs  

Broader source: Energy.gov (indexed) [DOE]

FUEL CELL TECHNOLOGIES PROGRAM Hydrogen and Infrastructure Costs Hydrogen Infrastructure Market Readiness Workshop Washington D.C. February 17, 2011 Fred Joseck U.S. Department of...

326

''When Cost Measures Contradict''  

SciTech Connect (OSTI)

When regulators put forward new economic or regulatory policies, there is a need to compare the costs and benefits of these new policies to existing policies and other alternatives to determine which policy is most cost-effective. For command and control policies, it is quite difficult to compute costs, but for more market-based policies, economists have had a great deal of success employing general equilibrium models to assess a policy's costs. Not all cost measures, however, arrive at the same ranking. Furthermore, cost measures can produce contradictory results for a specific policy. These problems make it difficult for a policy-maker to determine the best policy. For a cost measures to be of value, one would like to be confident of two things. First one wants to be sure whether the policy is a winner or loser. Second, one wants to be confident that a measure produces the correct policy ranking. That is, one wants to have confidence in a policy measure's ability to correctly rank policies from most beneficial to most harmful. This paper analyzes empirically these two properties of different costs measures as they pertain to assessing the costs of the carbon abatement policies, especially the Kyoto Protocol, under alternative assumptions about implementation.

Montgomery, W. D.; Smith, A. E.; Biggar, S. L.; Bernstein, P. M.

2003-05-09T23:59:59.000Z

327

Apportioning Climate Change Costs  

E-Print Network [OSTI]

Apportioning Climate Change Costs Daniel A. Farber* I. II.ON CLIMATE CHANGE FOUR QUESTIONS ABOUTof how to respond to climate change. Most public attention

Farber, Daniel A.

2008-01-01T23:59:59.000Z

328

Project Scoping and CostProject Scoping and Cost Management:Management  

E-Print Network [OSTI]

time? #12;MnMn/DOT Scoping Process Principles/DOT Scoping Process Principles MnMn/DOT developed a best-practices/DOT developed a best-practices Scoping Model with these Principles:Scoping Model with these Principles: Early and Integration withOffice Overview and Integration with Environmental ProcessesEnvironmental Processes April 1

Minnesota, University of

329

Unaccounted-for gas cost allocation  

SciTech Connect (OSTI)

As competitive pressures grow, gas utility managers have stepped up their search for ways to ensure that rates remain competitive. This challenge is particularly acute in the large commercial and industrial market segments, which are most typically [open quotes]at risk.[close quotes] A variety of cost-allocation studies have been undertaken to determine more accurately what costs are associated with serving market segments, and which costs should be recovered from each. Because there are clear winners and losers in this process (at least, it is clear who wins and loses in the short term), these reallocations have been hotly debated and fiercely litigated. Any proposed change in allocation must be supported by either compelling logic or empirical evidence. This article suggests a method of reallocating the costs associated with unaccounted-for (UAF) gas volumes, based on results from two studies of the elements contributing to UAF gas.

Ozenne, D.G. (Univ. of California, Los Angeles, CA (United States))

1994-02-15T23:59:59.000Z

331

Quality Cost Analysis: Benefits and Risks Copyright Cem Kaner  

E-Print Network [OSTI]

managers."1 Joseph Juran, one of the world's leading quality theorists, has been advocating the analysis. "Quality Costs" in Juran, J.M. & Gryna, F. M. (1988, 4th Ed.), Juran's Quality Control Handbook, Mc Gryna, F. M. "Quality Costs" in Juran, J.M. & Gryna, F. M. (1988, 4th Ed.), Juran's Quality Control

332

Office of Acquisition and Project Management  

Office of Environmental Management (EM)

Management Office of Nuclear Materials Disposition Office of Waste Treatment PlantTank Farm Program 1122012 16 reduce planning, design, and construction costs and maintenance...

333

Management Overview  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-Cost ProductionManagement Controls over

334

Management Overview  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-Cost ProductionManagement Controls overOverview -

335

Management Overview  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-Cost ProductionManagement Controls overOverview

336

Management Overview  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-Cost ProductionManagement Controls

337

Management Overview  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-Cost ProductionManagement ControlsVHTR Materials

338

An Examination of Avoided Costs in Utah  

E-Print Network [OSTI]

existing avoided cost methodology and established thefor certain avoided cost methodologies or avoided cost inpu

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

339

California Federal Facilities: Rate-Responsive Buidling Operating for Deeper Cost and Energy Savings  

Broader source: Energy.gov [DOE]

Fact sheet from the Federal Energy Management Program (FEMP) describes rate-responsive building operations for cost and energy savings in California federal facilities.

340

E-Print Network 3.0 - average system cost Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Berkeley National Laboratory, High Redshift Supernova Search Collection: Physics ; Power Transmission, Distribution and Plants 3 Project Cost Management King Fahd University...

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Graduate Certificate in Construction Engineering and Management  

E-Print Network [OSTI]

, Green Building Materials and Techniques, Sustainable Development and Construction Dr. Tewodros Ghebrab, Sustainable construction methods and materials in buildings and infrastructure systems, Engineering cost Management. Students choose two electives from: · Construction Safety and Risk Management, · Sustainable

Gelfond, Michael

342

Supply chain management in the cement industry  

E-Print Network [OSTI]

Traditionally supply chain management has played an operational role within cement and mineral extraction commodity companies. Recently, cost reduction projects have brought supply chain management into the limelight. In ...

Agudelo, Isabel

2009-01-01T23:59:59.000Z

343

Crop Management Factors: What is Important?  

E-Print Network [OSTI]

Various management factors, including specific practices and the persistence of those practices over time, can greatly influence farm profitability. Some of those factors are managing for high yield or low production cost, as well as adoption...

Kastens, Terry L.; Dhuyvetter, Kevin C.; Nivens, Heather; Klinefelter, Danny A.

1999-09-29T23:59:59.000Z

344

Cost Comparison of Public Elementary School Construction Costs Based on Project Delivery System in the State of Texas  

E-Print Network [OSTI]

and cost controls. Reinisch and Caguioa (2010) noted that there are several methods for choosing what the construction authority considers the most appropriate project delivery system. Nichols and Feigenbaum (Feigenbaum, 2011; Nichols, 2011) observed... Members, Leslie H. Feigenbaum Head of Department, Joseph P. Horlen December 2011 Major Subject: Construction Management iii ABSTRACT Cost Comparison of Public Elementary School Construction Costs Based on Project Delivery System in the State...

Reinisch, Ashley

2012-02-14T23:59:59.000Z

345

IDC RP2 & 3 US Industry Standard Cost Estimate Summary.  

SciTech Connect (OSTI)

Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, using a commercial software cost estimation tool calibrated to US industry performance parameters. This is not a cost estimate for Sandia to perform the project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

Harris, James M.; Huelskamp, Robert M.

2015-01-01T23:59:59.000Z

346

Office of Inspector General audit report on the U.S. Department of Energy`s management of Associated Western Universities grant programs  

SciTech Connect (OSTI)

The Department of Energy (DOE), recognizing the need to maintain a strong science and engineering base at a time when enrollments in these disciplines were declining, implemented several educational programs. Among these were educational programs to provide faculty and students of US colleges and universities with energy-related training and research experience. Associated Western Universities (AWU), a nonprofit organization, administered post-secondary educational programs for DOE through grants and, occasionally, subcontracts. The objectives of the audit were to determine whether: (1) DOE was achieving its goal of enhancing US science and engineering education and (2) AWU was appropriately accumulating and classifying its costs. It was found that DOE was not fully achieving its objective of enhancing science and engineering education for students of US colleges and universities. In addition, it was found that AWU had not complied with cost principles for nonprofit organizations as required under the terms of the grants. Specifically, AWU misclassified a $13,000 overrun of direct program cost as indirect cost, incurred $40,000 of idle facility costs that were unallowable under the terms of the grant, misclassified indirect costs as direct costs, and claimed reimbursement for consultant costs that were inappropriate under the terms of the consulting contract. These discrepancies resulted in $53,000 of questionable costs, as well as costs having been charged to the Office of Energy Research (ER) grant that should have been charged to the Richland and Idaho grants. The authors recommended that the Managers of the Richland and Idaho Operations offices take actions to ensure that the objectives of DOE`s educational programs are met. In addition, they recommended that the Manager, Idaho Operations Office, direct the Contracting Officer to have AWU comply with the appropriate cost principles for nonprofit organizations.

NONE

1998-04-01T23:59:59.000Z

347

Directives Help  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

All DOE directives are available through this site. While it may seem overwhelming, given the number of documents, we have provided a number of ways in which you may get to the information you need.

348

Energy Management Practices at Dalls/Fort Worth International Airport  

E-Print Network [OSTI]

Energy Management Practices at Dallas/Fort Worth International Airport Jerry R. Dennis, CEM, CEP Energy Manager October 9, 2013 Energy Management Practices at DFW Airport, October 9, 2013 Presentation Outline ? DFW Airport Overview ? Energy... Management Section ? Structure & Mission ? Supply-Side Management ? Reliability ? Cost (Risk) mitigation ? Environmental stewardship ? Demand-Side Management ? Energy monitoring ? Energy audits ? Energy standards ? Continuous Commissioning...

Dennis, J. R.

2013-01-01T23:59:59.000Z

349

Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09

1996-09-30T23:59:59.000Z

350

Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09.

1996-09-30T23:59:59.000Z

351

Battery Thermal Management System Design Modeling  

SciTech Connect (OSTI)

Looks at the impact of cooling strategies with air and both direct and indirect liquid cooling for battery thermal management.

Pesaran, A.; Kim, G. H.

2006-11-01T23:59:59.000Z

352

New Item is requested directly by Physician  

E-Print Network [OSTI]

New Item is requested directly by Physician and communicated to Materials Management via email New Item is requested via Special Needs Report and communicated to Materials Management via email New Item is requested via Vendor Rep on behalf of Physician and is communicated to Materials Management via email

Oliver, Douglas L.

353

Cost Analysis of NEMO Protocol Md. Shohrab Hossain , Mohammed  

E-Print Network [OSTI]

based on all-IP technology, compounded by the fact that the number of mobile nodes requiring mobility have developed analytical models to estimate total costs of key mobility management entities of NEMO, mobility management entities, computer networks. I. INTRODUCTION To ensure continuous Internet connectivity

Atiquzzaman, Mohammed

354

''Measuring the Costs of Climate Change Policies''  

SciTech Connect (OSTI)

Studies of the costs of climate change policies have utilized a variety of measures or metrics for summarizing costs. The leading economic models have utilized GNP, GDP, the ''area under a marginal cost curve,'' the discounted present value of consumption, and a welfare measure taken directly from the utility function of the model's representative agent (the ''Equivalent Variation''). Even when calculated using a single model, these metrics do not necessarily give similar magnitudes of costs or even rank policies consistently. This paper discusses in non-technical terms the economic concepts lying behind each concept, the theoretical basis for expecting each measure to provide a consistent ranking of policies, and the reasons why different measures provide different rankings. It identifies a method of calculating the ''Equivalent Variation'' as theoretically superior to the other cost metrics in ranking policies. When regulators put forward new economic or regulatory policies, there is a need to compare the costs and benefits of these new policies to existing policies and other alternatives to determine which policy is most cost-effective. For command and control policies, it is quite difficult to compute costs, but for more market-based policies, economists have had a great deal of success employing general equilibrium models to assess a policy's costs. Not all cost measures, however, arrive at the same ranking. Furthermore, cost measures can produce contradictory results for a specific policy. These problems make it difficult for a policy-maker to determine the best policy. For a cost measures to be of value, one would like to be confident of two things. First one wants to be sure whether the policy is a winner or loser. Second, one wants to be confident that a measure produces the correct policy ranking. That is, one wants to have confidence in a policy measure's ability to correctly rank policies from most beneficial to most harmful. This paper analyzes empirically these two properties of different costs measures as they pertain to assessing the costs of the carbon abatement policies, especially the Kyoto Protocol, under alternative assumptions about implementation.

Montgomery, W. D.; Smith, A. E.; Biggar, S. L.; Bernstein, P.M.

2003-05-09T23:59:59.000Z

355

Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Automotive Applications Jayanti Sinha Stephen Lasher Yong Yang Peter Kopf Fuel Cell Tech Team Review September 24, 2008 TIAX LLC 15 Acorn Park Cambridge, MA 02140-2390...

356

Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat Pump Models |Conduct, Parent(CRADA and DOW Automotive) |and DPFDirectApplications:

357

Power Plant Cycling Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(say, a trip) and such factors are not fully captured in this dataset. 9. Older combined cycle units were a step change in lower operating costs due to cycling...

358

Estimating Renewable Energy Costs  

Broader source: Energy.gov [DOE]

Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

359

Cost Estimating Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

2011-05-09T23:59:59.000Z

360

Investments of uncertain cost  

E-Print Network [OSTI]

I study irreversible investment decisions when projects take time to complete, and are subject to two types of uncertainty over the cost of completion. The first is technical uncertainty, i.e., uncertainty over the amount ...

Pindyck, Robert S.

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Standard costs for labor  

E-Print Network [OSTI]

STANDARD COSTS FOR LABOR A Thesis By MD. NURUL ABSAR KHAN Submitted to the Graduate School of the Agricultural and Mechanical College of Texms in partial fulfillment of the requirements for the degree of MASTER OF BUSINESS ADMINISTRATION... January 1960 Ma/or Sub)acts Accounting STANOAHD COSTS FOR LABOR ND, NURUL ABSAR KHAN Approved as t style and content bys Chairman of Committee Head of Hepartment January 1960 The author acknowledges his indebtedness to Mr. T. M. Leland, Mr. T. D...

Khan, Mohammed Nurul Absar

1960-01-01T23:59:59.000Z

362

TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT  

SciTech Connect (OSTI)

Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

LESKO KF; BERRIOCHOA MV

2010-02-26T23:59:59.000Z

363

Ensuring cost effectiveness in the TAP process  

SciTech Connect (OSTI)

The Training Accredition Program (TAP) at the Waste Isolation Division (WID) is discussed by the general manager. Cost effectiveness in the TAP process is made possible by saving through sharing which refers to the exchange and co-development of information and technology among Westinghouse Government owned-contractor operators and with other organizations. In 1990 a comprehensive management and supervisor training (MAST) program plan was devised and a MAST certification program of 31 self-paced written moduler was developed. This program has proven to be inexpensive to develop and implement when compared to classroom training. In addition, total quality is used as a tool to continuously improve work process. Continuous improvement requires continued evaluation of work process, such as TAP analysis and development in summary to make training at DOE facilities the most cost-effective training anywhere, we need to share, challenge conventional wisdom, and seek to continuously improve.

Trego, A.L.

1992-06-16T23:59:59.000Z

364

Cost-effectiveness analysis of effluent standards and limitations for the metal finishing industry. Final report  

SciTech Connect (OSTI)

The report summarizes the results of a cost-effectiveness analysis of the metal finishing industry. The analysis considers the cost-effectiveness of the final metal finishing regulations for direct and indirect dischargers.

Not Available

1983-06-01T23:59:59.000Z

365

The Market Value and Cost of Solar Photovoltaic Electricity Production  

E-Print Network [OSTI]

the premium value of solar PV power to 0%-20% again. Whilepower to that location. While few dispute that the direct cost of electricity from the currently available solar

Borenstein, Severin

2008-01-01T23:59:59.000Z

366

The cost of noise reduction in commercial tilt rotor aircraft  

E-Print Network [OSTI]

The relationship between direct operating cost and departure noise annoyance was developed for commercial tilt rotor aircraft. This was accomplished by generating a series of tilt rotor aircraft designs to meet various ...

Faulkner, Henry B.

1974-01-01T23:59:59.000Z

367

Health Care Costs Associated with Violence in Pennsylvania 1994  

E-Print Network [OSTI]

Health Care Costs Associated with Violence in Pennsylvania 1994 March 2000 Health Services Research of violent events that occurred in Pennsylvania for the year 1994, and to estimate the health care costs, and domestic abuse; self-directed violence, including completed and attempted suicide; and violence involving

Songer, Thomas J.

368

Filtering Decomposable Global Cost Functions D. Allouche1  

E-Print Network [OSTI]

frameworks (Schiex, Fargier, and Ver- faillie 1995) federates a variety of famous problems includ- ing CSP to weighted CSP, defining Global Cost Func- tions (Zytnicki et al. 2009; Lee and Leung 2012) with asso- ciated- composition is essentially equivalent to a direct application on the original global cost function. Finally

Paris-Sud XI, Université de

369

Roadway Improvement Project Cost Allocation  

E-Print Network [OSTI]

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

370

Sunk Costs and Competitive Bidding  

E-Print Network [OSTI]

SUNK COSTS AND COMPETITIVE BIDDING Kenneth R. FrenchRevised: November 1982 SUNK COSTS AND COMPETITIVE BIDDINGl the winning bid be? I f sunk costs do not matter, I f the

French, Kenneth R.; McCormick, Robert E.

1982-01-01T23:59:59.000Z

371

Mandatory Photovoltaic System Cost Analysis  

Broader source: Energy.gov [DOE]

The Arizona Corporation Commission requires electric utilities to conduct a cost/benefit analysis to compare the cost of line extension with the cost of installing a stand-alone photovoltaic (PV)...

372

Factors Impacting Decommissioning Costs - 13576  

SciTech Connect (OSTI)

The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

Kim, Karen; McGrath, Richard [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)] [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)

2013-07-01T23:59:59.000Z

373

Human Resource Management Delegation  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The notice is to clarifies and updates existing Human Resource Management Delegation Authorities and the levels to which they are delegated. Expired 6-28-97. Does not cancel any directives.

1996-06-28T23:59:59.000Z

374

New fuel injector design lowers cost  

SciTech Connect (OSTI)

This article describes the Bendix Deka injector series. Bendix engineers have been striving to lessen costs of all portions of the injection equipment, especially single and multipoint injectors. Results of these efforts are advanced, thin-edged orifice and floating unitized armature designs. External configurations of both multipoint and single point Bendix Deka injectors are such that they can directly replace existing products. Both injector types are designed to be able to deliver any calibration within the currently-known requirements. Flow tolerances for Deka injectors match all known requirements, representing a good economic balance between performance and cost. Materials were carefully chosen for wear and corrosion resistance.

De Grace, L.G.; Bata, G.T.

1985-03-01T23:59:59.000Z

375

Construction Costs of Six Landfill Cover Designs  

SciTech Connect (OSTI)

A large-scale field demonstration comparing and contrasting final landfill cover designs has been constructed and is currently being monitored. Four alternative cover designs and two conventional designs (a RCRA Subtitle `D' Soil Cover and a RCRA Subtitle `C' Compacted Clay Cover) were constructed side-by-side for direct comparison. The demonstration is intended to evaluate the various cover designs based on their respective water balance performance, ease and reliability of construction, and cost. This paper provides an overview of the construction costs of each cover design.

Dwyer, S.F.

1998-12-23T23:59:59.000Z

376

DOE - Office of Legacy Management -- Directions  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofofOxford SiteToledo SiteTonawanda North SiteD&Dir^0 0 0 0 0 0>

377

Configuration Management Program - DOE Directives, Delegations, and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed New SubstationCleanCommunity2Workshops 2008 To report an event that is

378

QGESS: Capital Cost Scaling Methodology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(costs and values of inputs, outputs, and processes, including capital and operating costs) and performance (mass conversion, energy efficiency, and, generally speaking,...

379

Cost and Performance Assumptions for Modeling Electricity Generation Technologies  

SciTech Connect (OSTI)

The goal of this project was to compare and contrast utility scale power plant characteristics used in data sets that support energy market models. Characteristics include both technology cost and technology performance projections to the year 2050. Cost parameters include installed capital costs and operation and maintenance (O&M) costs. Performance parameters include plant size, heat rate, capacity factor or availability factor, and plant lifetime. Conventional, renewable, and emerging electricity generating technologies were considered. Six data sets, each associated with a different model, were selected. Two of the data sets represent modeled results, not direct model inputs. These two data sets include cost and performance improvements that result from increased deployment as well as resulting capacity factors estimated from particular model runs; other data sets represent model input data. For the technologies contained in each data set, the levelized cost of energy (LCOE) was also evaluated, according to published cost, performance, and fuel assumptions.

Tidball, R.; Bluestein, J.; Rodriguez, N.; Knoke, S.

2010-11-01T23:59:59.000Z

380

Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program  

SciTech Connect (OSTI)

This report presents the findings of the Interagency Requirements Review of the Department of Energy (DOE) Environmental Restoration and Waste Management (ERWM) Program. The review was requested by Admiral Watkins to help determine the FY 1993 funding levels necessary to meet all legal requirements. The review was undertaken by analysts from the Office of Management and Budget (OMB) and Army Corps of Engineers, reporting to an Interagency Group (IAG) of senior Administration officials concerned with environmental cleanup issues. The purpose of the study was to determine the level of finding needed in FY 1993 for each ERWM Field Office to comply with all Federal, State, and local government legal requirements; all DOE Orders that establish standards for environment, safety and health (ES and H) management; and for prudent investments in other discretionary and management activities such as upgrading administrative buildings, information systems, etc. The study also reviewed the cost estimates supporting the ERWM proposed budget, including direct costs (labor, equipment) and indirect costs (administrative, landlord services, contractor overhead). The study did not analyze whether the Federal/State legal requirements and DOE Orders were necessary or whether the proposed clean-up remedies represent the most cost effective alternatives available.

NONE

1992-04-29T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

A Growing and Costly Issue An estimated 1.8 million adult Texans have been  

E-Print Network [OSTI]

A Growing and Costly Issue An estimated 1.8 million adult Texans have been diagnosed with diabetes, while the diabetes in another 460,000 remains undiagnosed. The annual cost of diabetes in Texas's Response Diabetes is not curable, but it is manageable. People can learn skills to effectively manage

382

A Growing and Costly Issue An estimated 1.8 million adult Texans have been  

E-Print Network [OSTI]

A Growing and Costly Issue An estimated 1.8 million adult Texans have been diagnosed with diabetes, while the diabetes of another 460,000 remains undiagnosed. The annual cost of diabetes in Texas's Response Diabetes is not curable, but it is manageable. People can learn skills to effectively manage

383

Low Cost, Durable Seal  

SciTech Connect (OSTI)

Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

Roberts, George; Parsons, Jason; Friedman, Jake

2010-12-17T23:59:59.000Z

384

Shifting the Paradigm for Long Term Monitoring at Legacy Sites to Improve Performance while Reducing Cost  

SciTech Connect (OSTI)

A major issue facing many government and private industry sites that were previously contaminated with radioactive and chemical wastes is that often the sites cannot be cleaned up enough to permit unrestricted human access. These sites will require long-term management, in some cases indefinitely, leaving site owners with the challenge of protecting human health and environmental quality in a cost effective manner. Long-term monitoring of groundwater contamination is one of the largest projected costs in the life cycle of environmental management at the Savannah River Site (SRS), the larger DOE complex, and many large federal and private sites. Currently, most monitoring strategies are focused on laboratory measurements of contaminants measured in groundwater samples collected from wells. This approach is expensive, and provides limited and lagging information about the effectiveness of cleanup activities and the behavior of the residual contamination. Over the last twenty years, DOE and other federal agencies have made significant investments in the development of various types of sensors and strategies that would allow for remote analysis of contaminants in groundwater, but these approaches do not promise significant reductions in risk or cost. Scientists at SRS have developed a new paradigm to simultaneously improve the performance of long term monitoring systems while lowering the overall cost of monitoring. This alternative approach incorporates traditional point measurements of contaminant concentration with measurements of controlling variables including boundary conditions, master variables, and traditional plume/contaminant variables. Boundary conditions are the overall driving forces that control plume movement and therefore provide leading indication to changes in plume stability. These variables include metrics associated with meteorology, hydrology, hydrogeology, and land use. Master variables are the key variables that control the chemistry of the groundwater system, and include redox variables (ORP, DO, chemicals), pH, specific conductivity, biological community (breakdown/decay products), and temperature. A robust suite of relatively inexpensive tools is commercially available to measure these variables. Traditional plume/contaminant variables are various measures of contaminant concentration including traditional analysis of chemicals in groundwater samples. An innovative long term monitoring strategy has been developed for acidic or caustic groundwater plumes contaminated with metals and/or radionuclides. Not only should the proposed strategy be more effective at early identification of potential risks, this strategy should be significantly more cost effective because measurement of controlling boundary conditions and master variables is relatively simple. These variables also directly reflect the evolution of the plume through time, so that the monitoring strategy can be modified as the plume 'ages'. This transformational long-term monitoring paradigm will generate significant cost savings to DOE, other federal agencies and industry and will provide improved performance and leading indicators of environmental management performance.

Eddy-Dilek, Carol A.; Looney, Brian B.; Seaman, John; Kmetz, Thomas

2013-01-10T23:59:59.000Z

385

MANUFACTURING & SERVICE OPERATIONS MANAGEMENT  

E-Print Network [OSTI]

MANUFACTURING & SERVICE OPERATIONS MANAGEMENT Vol. 14, No. 4, Fall 2012, pp. 495­511 ISSN 1523 research directions, expanding upon the key points raised by Green [Green LV (2012) The vital role of operations analysis in improving healthcare delivery. Manufacturing Service Oper. Management 14

Boucherie, Richard J.

386

Comprehensive Emergency Management System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish policy and to assign and describe roles and responsibilities for the Department of Energy (DOE) Emergency Management System. The Emergency Management System provides the framework for development, coordination, control, and direction of all emergency planning, preparedness, readiness assurance, response, and recovery actions. Canceled by DOE O 151.1B. Cancels DOE O 151.1.

2000-11-01T23:59:59.000Z

387

Cost Type Examples Salary costs for staff working  

E-Print Network [OSTI]

. Equipment access charges Service contracts, running costs, materials and consumables and staff time

Rambaut, Andrew

388

Extension of DOE Directives  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The following directives are extended until 3-18-06: DOE N 205.8, Cyber Security Requirements for Wireless Devices and Information Systems, dated 2-11-04; DOE N 205.9, Certification and Accreditation Process for Information Systems Including National Security Systems, dated 02-19-04; DOE N 205.10, Cyber Security Requirements for Risk Management, dated 02-19-04; DOE N 205.11, Security Requirements for Remote Access to DOE and Applicable Contractor Information Technology Systems, dated 2-19-04. DOE N 205.12, Clearing, Sanitizing, and Destroying Information System Storage Media, Memory Devices, and Other Related Hardware, dated 2-19-04.

2005-03-18T23:59:59.000Z

389

Integrating Knowledge Management and Human Resources via Skill Management  

E-Print Network [OSTI]

Integrating Knowledge Management and Human Resources via Skill Management Norbert Gronau. The human resources department can look for certain skills and compare the skills of an employee [Kreitmeier et al. 2000]. The company is able to save costs that otherwise apply to placing adverts for job

Appelrath, Hans-Jürgen

390

Office of Human Resources -Employment & Compensation 1 MANAGEMENT NON-MANAGEMENT  

E-Print Network [OSTI]

the work of two (2) or more employees · Majority of time is spent directly managing people (i.e. over 50Office of Human Resources - Employment & Compensation 1 MANAGEMENT NON-MANAGEMENT Typically includes, but is not limited to activities such as: Manages direct reports where primary duty

Yener, Aylin

391

Heliostat cost reduction study.  

SciTech Connect (OSTI)

Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David (Advanced Thermal Systems, Larkspur, CO); Kolb, Gregory J.; Donnelly, Matthew W.

2007-06-01T23:59:59.000Z

392

The Program Administrator Cost of Saved Energy for Utility Customer-Funded Energy Efficiency Programs  

SciTech Connect (OSTI)

End-use energy efficiency is increasingly being relied upon as a resource for meeting electricity and natural gas utility system needs within the United States. There is a direct connection between the maturation of energy efficiency as a resource and the need for consistent, high-quality data and reporting of efficiency program costs and impacts. To support this effort, LBNL initiated the Cost of Saved Energy Project (CSE Project) and created a Demand-Side Management (DSM) Program Impacts Database to provide a resource for policy makers, regulators, and the efficiency industry as a whole. This study is the first technical report of the LBNL CSE Project and provides an overview of the project scope, approach, and initial findings, including: • Providing a proof of concept that the program-level cost and savings data can be collected, organized, and analyzed in a systematic fashion; • Presenting initial program, sector, and portfolio level results for the program administrator CSE for a recent time period (2009-2011); and • Encouraging state and regional entities to establish common reporting definitions and formats that would make the collection and comparison of CSE data more reliable. The LBNL DSM Program Impacts Database includes the program results reported to state regulators by more than 100 program administrators in 31 states, primarily for the years 2009–2011. In total, we have compiled cost and energy savings data on more than 1,700 programs over one or more program-years for a total of more than 4,000 program-years’ worth of data, providing a rich dataset for analyses. We use the information to report costs-per-unit of electricity and natural gas savings for utility customer-funded, end-use energy efficiency programs. The program administrator CSE values are presented at national, state, and regional levels by market sector (e.g., commercial, industrial, residential) and by program type (e.g., residential whole home programs, commercial new construction, commercial/industrial custom rebate programs). In this report, the focus is on gross energy savings and the costs borne by the program administrator—including administration, payments to implementation contractors, marketing, incentives to program participants (end users) and both midstream and upstream trade allies, and evaluation costs. We collected data on net savings and costs incurred by program participants. However, there were insufficient data on participant cost contributions, and uncertainty and variability in the ways in which net savings were reported and defined across states (and program administrators).

Billingsley, Megan A.; Hoffman, Ian M.; Stuart, Elizabeth; Schiller, Steven R.; Goldman, Charles A.; LaCommare, Kristina

2014-03-19T23:59:59.000Z

393

Hay Harvesting Costs $$$$$ in Texas.  

E-Print Network [OSTI]

Hay is an important crop in Ta 1 Harvesting costs constitute the major5 pense of hay production in many M Mg and Wayne D . Taylor INTRODUCTION .................................................... 2 Fixed Costs or Ownership Costs... ............................................. 10 Totarl Cost .............................................................. 10 HAY HARVESTING ALTERNATIVES COMPARED ...................... 11 HOW TO MAKE WISE DECISIONS CONCERNING INVESTMENTS IN MACHINERY...

Long, James T.; Taylor, Wayne D.

1972-01-01T23:59:59.000Z

394

COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY GENERATION .............................................................................13 Definition of Levelized Cost ........................................................................................................13 Levelized Cost Components

395

COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY GENERATION............................................................ 3 Definition of Levelized Cost.................................................................................... 3 Levelized Cost Categories

Laughlin, Robert B.

396

A Generic WebBased Network Management Application  

E-Print Network [OSTI]

of network manage­ ment applications that eliminates most of the tedious work, and reduces development costsA Generic Web­Based Network Management Application Yehuda Afek \\Lambda Yoram Cohen y Computer to network management is introduced. In traditional network management each management application

Afek, Yehuda

397

Moving Core Services to the Edge in NGNs for Reducing Managed Infrastructure Size  

E-Print Network [OSTI]

% for CAPEX, while OPEX remains fairly stable due to network management and energy costs. At the same time we

Amir, Yair

398

Cost Estimating, Analysis, and Standardization  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

1984-11-02T23:59:59.000Z

399

Combined Waste Form Cost Trade Study  

SciTech Connect (OSTI)

A new generation of aqueous nuclear fuel reprocessing, now in development under the auspices of the DOE Office of Nuclear Energy (NE), separates fuel into several fractions, thereby partitioning the wastes into groups of common chemistry. This technology advance enables development of waste management strategies that were not conceivable with simple PUREX reprocessing. Conventional wisdom suggests minimizing high level waste (HLW) volume is desirable, but logical extrapolation of this concept suggests that at some point the cost of reducing volume further will reach a point of diminishing return and may cease to be cost-effective. This report summarizes an evaluation considering three groupings of wastes in terms of cost-benefit for the reprocessing system. Internationally, the typical waste form for HLW from the PUREX process is borosilicate glass containing waste elements as oxides. Unfortunately several fission products (primarily Mo and the noble metals Ru, Rh, Pd) have limited solubility in glass, yielding relatively low waste loading, producing more glass, and greater disposal costs. Advanced separations allow matching the waste form to waste stream chemistry, allowing the disposal system to achieve more optimum waste loading with improved performance. Metals can be segregated from oxides and each can be stabilized in forms to minimize the HLW volume for repository disposal. Thus, a more efficient waste management system making the most effective use of advanced waste forms and disposal design for each waste is enabled by advanced separations and how the waste streams are combined. This trade-study was designed to juxtapose a combined waste form baseline waste treatment scheme with two options and to evaluate the cost-benefit using available data from the conceptual design studies supported by DOE-NE.

Dirk Gombert; Steve Piet; Timothy Trickel; Joe Carter; John Vienna; Bill Ebert; Gretchen Matthern

2008-11-01T23:59:59.000Z

400

Low cost subpixel method for vibration measurement  

SciTech Connect (OSTI)

Traditional vibration measurement methods are based on devices that acquire local data by direct contact (accelerometers, GPS) or by laser beams (Doppler vibrometers). Our proposal uses video processing to obtain the vibration frequency directly from the scene, without the need of auxiliary targets or devices. Our video-vibrometer can obtain the vibration frequency at any point in the scene and can be implemented with low-cost devices, such as commercial cameras. Here we present the underlying theory and some experiments that support our technique.

Ferrer, Belen [Department of Civil Engineering, Univ. Alicante P.O. Box, 99, 03080 Alicante (Spain); Espinosa, Julian; Perez, Jorge; Acevedo, Pablo; Mas, David [Inst. of Physics Applied to the Sciences and Technologies, Univ. Alicante P.O. Box, 99, 03080 Alicante (Spain); Roig, Ana B. [Department of Optics, Univ. Alicante P.O. Box, 99, 03080 Alicante (Spain)

2014-05-27T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Industrial Energy Management: Doing More with Less  

E-Print Network [OSTI]

during the course of business — with energy-intensive operations such as aluminum and chemical processing plants experiencing energy costs between five and 10 times higher than industry averages (Source: Department of Energy, Office of Industrial... INDUSTRIAL ENERGY MANAGEMENT: DOING MORE WITH LESS Jason Sheppard, Industrial Market Segment Manager Anthony Tisot, Communications Manager Power Monitoring and Control SCHNEIDER ELECTRIC Victoria, BC, Canada ABSTRACT The cost of doing...

Sheppard, J.; Tisot, A.

2006-01-01T23:59:59.000Z

402

Work Experience Guidance for Managers  

E-Print Network [OSTI]

Work Experience Guidance for Managers When approached with a request for work experience, managers. Any queries regarding CRB checks should be directed to your designated HR Manager. When a work any work, paid or unpaid: Before 7am or after 7pm For more than two hours on a school day or Sunday

403

Geothermal probabilistic cost study  

SciTech Connect (OSTI)

A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)

Orren, L.H.; Ziman, G.M.; Jones, S.C.; Lee, T.K.; Noll, R.; Wilde, L.; Sadanand, V.

1981-08-01T23:59:59.000Z

404

An algorithm for recovery of distributed applications with directed dependencies  

E-Print Network [OSTI]

recovery. The thesis proposes a distributed algorithm which coordinates management entities, called agents, to monitor the managed resources (which have directed failure and recovery dependencies among them) and perform recovery actions once failures have...

Yang, Jiantian

1996-01-01T23:59:59.000Z

405

LIFE Cost of Electricity, Capital and Operating Costs  

SciTech Connect (OSTI)

Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

Anklam, T

2011-04-14T23:59:59.000Z

406

Finance and supply management project execution plan  

SciTech Connect (OSTI)

As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

BENNION, S.I.

1999-02-10T23:59:59.000Z

407

Earned Value Management Essentials 14 hours, $895  

E-Print Network [OSTI]

Earned Value Management Essentials 14 hours, $895 A growing demand for Earned Value Management (EVM in the tenets of work planned, work accomplished, and actual work cost. Earned Value terminology, formulae Management Analysis and Reporting 14 hours, $895 Government agencies and companies doing business

Fork, Richard

408

Vehicle operating costs: evidence from developing countries  

SciTech Connect (OSTI)

The document presents information concerning the relationships between vehicle operating costs and highway conditions derived from four studies performed in Kenya, the Caribbean, Brazil, and India in the 1970s and early 1980s. The levels of transport costs and the amounts by which they are altered when highway conditions change depend on two main factors. The first is the production technology facing firms, in particular, the types and designs of vehicles to which firms have access. The second is the economic environment that firms face, in particular, relative prices of inputs to the production of transportation, such as fuel, tires, labor, and vehicles, and the nature of the transport markets that firms serve. The first part of the book sets out an economic model of firms managing vehicle fleets within which these influences can be examined. The second part of the book reports and interprets the results of the four major research projects which were designed to study the influences on vehicle operating costs. The third part of the book examines total vehicle operating costs.

Chesher, A.; Harrison, R.

1987-01-01T23:59:59.000Z

409

LOW COST HEAT PUMP WATER HEATER (HPWH)  

SciTech Connect (OSTI)

Water heating accounts for the second largest portion of residential building energy consumption, after space conditioning. Existing HPWH products are a technical success, with demonstrated energy savings of 50% or more compared with standard electric resistance water heaters. However, current HPWHs available on the market cost an average of $1000 or more, which is too expensive for significant market penetration. What is needed is a method to reduce the first cost of HPWHs, so that the payback period will be reduced from 8 years to a period short enough for the market to accept this technology. A second problem with most existing HPWH products is the reliability issue associated with the pump and water loop needed to circulate cool water from the storage tank to the HPWH condenser. Existing integral HPWHs have the condenser wrapped around the water tank and thus avoid the pump and circulation issues but require a relatively complex and expensive manufacturing process. A more straightforward potentially less costly approach to the integral, single package HPWH design is to insert the condenser directly into the storage tank, or immersed direct heat exchanger (IDX). Initial development of an IDX HPWH met technical performance goals, achieving measured efficiencies or energy factors (EF) in excess of 1.79. In comparison conventional electric water heaters (EWH) have EFs of about 0.9. However, the initial approach required a 2.5" hole on top of the tank for insertion of the condenser - much larger than the standard openings typically provided. Interactions with water heater manufacturers indicated that the non standard hole size would likely lead to increased manufacturing costs (at least initially) and largely eliminate any cost advantage of the IDX approach. Recently we have been evaluating an approach to allow use of a standard tank hole size for insertion of the IDX condenser. Laboratory tests of a prototype have yielded an EF of 2.02.

Mei, Vince C [ORNL; Baxter, Van D [ORNL

2006-01-01T23:59:59.000Z

410

Cost analysis of German waste repositories  

SciTech Connect (OSTI)

In forecasting costs of final disposal for radioactive waste, the determined disposal concept and operational aspects such as the necessary amount for personnel to operate the repository are important. Even for the German deep geological concept, there are large differences resulting from the assessment to select an already existing mine or a completely new formation as a disposal site. Based on actual planning, the expected total costs of the running waste repository projects in the Federal Republic of Germany are presented including their distribution to single aspects like project management, underground investigation, licensing work and construction. Moreover, the actual expenditures for the different waste repositories are given and as far as possible the prices per m{sup 3}.

Berg, H.P.; Debski, H.J. [Bundesamt fuer Strahlenschutz, Salzgitter (Germany)

1993-12-31T23:59:59.000Z

411

INDEPENDENT COST REVIEW (ICR)  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG | Department ofHTS Cable ProjectsHistoryia/802871 IA Blog|INDEPENDENT COST

412

Network Management Network Management  

E-Print Network [OSTI]

that pertain to the operation, administration, maintenance, and provisioning of networked systems · Operation deals with keeping the network up (and the service provided by the network) · Administration involvesNetwork Management Pag. 1 Network Management Andrea Bianco Telecommunication Network Group Network

413

Defining groundwater remediation objectives with cost-1 benefit analysis: does it work?2  

E-Print Network [OSTI]

/or decontamination are related to direct50 groundwater use. Benefits are often considered as avoided costs1 Defining groundwater remediation objectives with cost-1 benefit analysis: does it work?2 3 J.7 *Corresponding author (E-mail: jd.rinaudo@brgm.fr)8 9 Abstract10 The use of cost-benefit analysis

Paris-Sud XI, Université de

414

Postmortem Cost and Schedule Analysis - Lessons Learned On NCSX  

SciTech Connect (OSTI)

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative fusion energy confinement device developed by the Princeton Plasma Physics Laboratory (PPPL) and Oak Ridge National Laboratory (ORNL) under contract from the US Department of Energy. The project was technically very challenging, primarily due to the complex component geometries and tight tolerances that were required. As the project matured these challenges manifested themselves in significant cost overruns through all phases of the project (i.e. design, R&D, fabrication and assembly). The project was subsequently cancelled by the DOE in 2008. Although the project was not completed, several major work packages, comprising about 65% of the total estimated cost (excluding management and contingency), were completed, providing a data base of actual costs that can be analyzed to understand cost drivers. Technical factors that drove costs included the complex geometry, tight tolerances, material requirements, and performance requirements. Management factors included imposed annual funding constraints that throttled project cash flow, staff availability, and inadequate R&D. Understanding how requirements and design decisions drove cost through this top-down forensic cost analysis could provide valuable insight into the configuration and design of future state-of-the art machines and other devices.

R. Strykowsky, T. Brown, J. Chrzanowski, M. Cole, P. Heitzenroeder, G.H. Neilson, Donald Rej, and M. Viola

2012-03-08T23:59:59.000Z

415

User cost in oil production  

E-Print Network [OSTI]

The assumption of an initial fixed mineral stock is superfluous and wrong. User cost (resource rent) in mineral production is the present value of expected increases in development cost. It can be measured as the difference ...

Adelman, Morris Albert

1990-01-01T23:59:59.000Z

416

RULES FOR CONGESTION MANAGEMENT EVALUATION OF AVAILABILITY OF CAPACITY AND  

E-Print Network [OSTI]

RULES FOR CONGESTION MANAGEMENT EVALUATION OF AVAILABILITY OF CAPACITY AND POSSIBILITIES................................................................16 5.6 Socio-economic cost of guaranteed capacity

417

Wind Integration Cost and Cost-Causation: Preprint  

SciTech Connect (OSTI)

The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

2013-10-01T23:59:59.000Z

418

Check Estimates and Independent Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

1997-03-28T23:59:59.000Z

419

Cost Effectiveness NW Energy Coalition  

E-Print Network [OSTI]

1 Action 8 Cost Effectiveness Manual Kim Drury NW Energy Coalition Context · Inconsistent understanding of cost effectiveness contributed to under performing conservation E.g: individual measures vs Action Plan for Energy Efficiency published a comprehensive guide on cost effectiveness: best practices

420

Keeping the Lights on While Cutting Costs.  

SciTech Connect (OSTI)

In 1992, the Bonneville Power Administration spent $361 million in capital on a system to transmit electricity. By 1998, it was spending about one-third that amount: $123 million. In 1992, BPA`s expenses for managing, operating and maintaining the transmission system ran $160 million. By 1998, BPA had cut expenses to $128 million. Maintenance costs alone were cut 28%. In 1992, management of the grid was split into six organizations. Today, there is one. About 2,900 people worked for transmission in October 1992. By February 1998, the Transmission Business Line (TBL) employed 1,855. Transmission in 1992 for the most part meant new towers, lines and substations. Today it means computers, digital communications and electronic controls.

United States. Bonneville Power Administration.

1998-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Lead By Example with Smart Energy Management (Brochure)  

SciTech Connect (OSTI)

Brochure outlining the mission and activities of the Department of Energy's Federal Energy Management Program, which facilitates the Federal Government's implementation of sound, cost-effective energy management and investment practices to enhance the nation's energy security and environmental stewardship.

Not Available

2009-07-01T23:59:59.000Z

422

Product development risk management and the role of transparency  

E-Print Network [OSTI]

Risks in product development lead to schedule and cost over-runs and poor product quality. While numerous risk management frameworks have been published and research on specific risk management practices and methods has ...

Olechowski, Alison L. (Alison Louise)

2012-01-01T23:59:59.000Z

423

Processing Cost Analysis for Biomass Feedstocks  

SciTech Connect (OSTI)

The receiving, handling, storing, and processing of woody biomass feedstocks is an overlooked component of biopower systems. The purpose of this study was twofold: (1) to identify and characterize all the receiving, handling, storing, and processing steps required to make woody biomass feedstocks suitable for use in direct combustion and gasification applications, including small modular biopower (SMB) systems, and (2) to estimate the capital and operating costs at each step. Since biopower applications can be varied, a number of conversion systems and feedstocks required evaluation. In addition to limiting this study to woody biomass feedstocks, the boundaries of this study were from the power plant gate to the feedstock entry point into the conversion device. Although some power plants are sited at a source of wood waste fuel, it was assumed for this study that all wood waste would be brought to the power plant site. This study was also confined to the following three feedstocks (1) forest residues, (2) industrial mill residues, and (3) urban wood residues. Additionally, the study was confined to grate, suspension, and fluidized bed direct combustion systems; gasification systems; and SMB conversion systems. Since scale can play an important role in types of equipment, operational requirements, and capital and operational costs, this study examined these factors for the following direct combustion and gasification system size ranges: 50, 20, 5, and 1 MWe. The scope of the study also included: Specific operational issues associated with specific feedstocks (e.g., bark and problems with bridging); Opportunities for reducing handling, storage, and processing costs; How environmental restrictions can affect handling and processing costs (e.g., noise, commingling of treated wood or non-wood materials, emissions, and runoff); and Feedstock quality issues and/or requirements (e.g., moisture, particle size, presence of non-wood materials). The study found that over the years the industry has shown a good deal of ingenuity and, as a result, has developed several cost effective methods of processing and handling wood. SMB systems usually cannot afford to perform much onsite processing and therefore usually purchase fuels processed to specification. Owners of larger systems try to minimize onsite processing to minimize processing costs. Whole truck dumpers are expensive, but allow for faster and easier unloading, which reduces labor costs and charges by the haulers. Storage costs are a major factor in overall costs, thus the amount of fuel reserve is an important consideration. Silos and bins are relatively expensive compared to open piles used for larger facilities, but may be required depending on space available, wood characteristics, and amount of wood to be stored. For larger systems, a front-end loader has a lot of flexibility in use and is an essential piece of equipment for moving material. Few opportunities appear to exist for improving the cost effectiveness of these systems.

Badger, P.C.

2002-11-20T23:59:59.000Z

424

COST SHARING Cost sharing is the portion of total project costs of a sponsored agreement that is not bourn by  

E-Print Network [OSTI]

1 COST SHARING Cost sharing is the portion of total project costs of a sponsored agreement. There are primarily three types of cost sharing that may occur on sponsored projects: Mandatory cost sharing. For example, the National Science Foundation requires mandatory cost sharing for some of its projects. COST

Cui, Yan

425

National Synchrotron Light Source Facility Manual Maintenance Management Program. Revision 1  

SciTech Connect (OSTI)

The purpose of this program s to meet the policy and objectives for the management and performance of cost-effective maintenance and repair of the National Synchrotron Light Source, as required by the US Department of Energy order DOE 433O.4A. It is the DOE`s policy that: The maintenance management program for the NSLS be consistent with this Order and that NSLS property is maintained in a manner which promotes operational safety, worker health, environmental protection and compliance, property preservation, and cost-effectiveness while meeting the NSLS`s programmatic mission. Structures, components and systems (active and passive) that are imporant to safe operation of the NSLS shall be subject to a maintenance program to ensure that they meet or exceed their design requirements throughout the life of the NSLS. Periodic examination of structures, systems components and equipment be performed to determine deterioration or technical obsolescence which may threaten performance and/or safety. Primary responsibility, authority, and accountability for the direction and management of the maintenance program at the NSLS reside with the line management assigned direct programmatic responsibility. Budgeting and accounting for maintenance programs are consistent with DOE Orders guidance.

Fewell, N.

1993-12-01T23:59:59.000Z

426

Critical analysis of the Hanford spent nuclear fuel project activity based cost estimate  

SciTech Connect (OSTI)

In 1997, the SNFP developed a baseline change request (BCR) and submitted it to DOE-RL for approval. The schedule was formally evaluated to have a 19% probability of success [Williams, 1998]. In December 1997, DOE-RL Manager John Wagoner approved the BCR contingent upon a subsequent independent review of the new baseline. The SNFP took several actions during the first quarter of 1998 to prepare for the independent review. The project developed the Estimating Requirements and Implementation Guide [DESH, 1998] and trained cost account managers (CAMS) and other personnel involved in the estimating process in activity-based cost (ABC) estimating techniques. The SNFP then applied ABC estimating techniques to develop the basis for the December Baseline (DB) and documented that basis in Basis of Estimate (BOE) books. These BOEs were provided to DOE in April 1998. DOE commissioned Professional Analysis, Inc. (PAI) to perform a critical analysis (CA) of the DB. PAI`s review formally began on April 13. PAI performed the CA, provided three sets of findings to the SNFP contractor, and initiated reconciliation meetings. During the course of PAI`s review, DOE directed the SNFP to develop a new baseline with a higher probability of success. The contractor transmitted the new baseline, which is referred to as the High Probability Baseline (HPB), to DOE on April 15, 1998 [Williams, 1998]. The HPB was estimated to approach a 90% confidence level on the start of fuel movement [Williams, 1998]. This high probability resulted in an increased cost and a schedule extension. To implement the new baseline, the contractor initiated 26 BCRs with supporting BOES. PAI`s scope was revised on April 28 to add reviewing the HPB and the associated BCRs and BOES.

Warren, R.N.

1998-09-29T23:59:59.000Z

427

Los Alamos National Laboratory Waste Management Program  

SciTech Connect (OSTI)

Los Alamos National Laboratory's (LANL) waste management program is responsible for disposition of waste generated by many of the LANL programs and operations. LANL generates liquid and solid waste that can include radioactive, hazardous, and other constituents. Where practical, LANL hazardous and mixed wastes are disposed through commercial vendors; low-level radioactive waste (LLW) and radioactive asbestos-contaminated waste are disposed on site at LANL's Area G disposal cells, transuranic (TRU) waste is disposed at the Waste Isolation Pilot Plant (WIPP), and high-activity mixed wastes are disposed at the Nevada Test Site (NTS) after treatment by commercial vendors. An on-site radioactive liquid waste treatment facility (RLWTF) removes the radioactive constituents from liquid wastes and treated water is released through an NPDES permitted outfall. LANL has a very successful waste minimization program. Routine hazardous waste generation has been reduced over 90% since 1993. LANL has a DOE Order 450.1-compliant environmental management system (EMS) that is ISO 14001 certified; waste minimization is integral to setting annual EMS improvement objectives. Looking forward, under the new LANL management and operating contractor, Los Alamos National Security (LANS) LLC, a Zero Liquid Discharge initiative is being planned that should eliminate flow to the RLWTF NPDES-permitted outfall. The new contractor is also taking action to reduce the number of permitted waste storage areas, to charge generating programs directly for the cost to disposition waste, and to simplify/streamline the waste system. (authors)

Lopez-Escobedo, G.M.; Hargis, K.M.; Douglass, C.R. [Los Alamos National Laboratory, NM (United States)

2007-07-01T23:59:59.000Z

428

Realistic costs of carbon capture  

SciTech Connect (OSTI)

There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

2009-07-01T23:59:59.000Z

429

Safety Management Functions, Responsibilities, and Authorities Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Manual defines safety management functions, responsibilities, and authorities for DOE senior management with responsibilities for line, support, oversight, and enforcement actions. Canceled by DOE M 411.1-1A. Does not cancel other directives.

1997-10-08T23:59:59.000Z

430

Farm and Ranch Business Management Functions  

E-Print Network [OSTI]

This publication discussess several management functions, including organization, staffing and direction and control. Suggested activities help managers learn how to implement these functions in their farm and ranch businesses....

McCorkle, Dean; Anderson, David P.

2009-02-04T23:59:59.000Z

431

Programs of the Governor's Energy Management Center  

E-Print Network [OSTI]

The 70th Texas Legislature transferred the Energy Efficiency Division of the Public Utility Commission to the Governor's Office in September 1987 and directed the Governor's Energy Management Center (GEMC) to perform energy management services...

Verdict, M.

1988-01-01T23:59:59.000Z

432

Directives Help - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directives Help by Website Administrator All DOE directives are available through this site. While it may seem overwhelming, given the number of documents, we have provided a...

433

Enriching personal information management with document interaction histories  

E-Print Network [OSTI]

Enriching personal information management with document interaction histories by Karl Gyllstrom;Abstract KARL GYLLSTROM: Enriching personal information management with document interaction histories. (Under the direction of David Stotts.) Personal information management is increasingly challenging

Whitton, Mary C.

434

Reducing the Cost of Solar Cells  

SciTech Connect (OSTI)

Solar-powered electricity prices could soon approach those of power from coal or natural gas thanks to collaborative research with solar startup Ampulse Corporation at the National Renewable Energy Laboratory. Silicon wafers account for almost half the cost of today's solar photovoltaic panels, so reducing or eliminating wafer costs is essential to bringing prices down. Current crystalline silicon technology converts energy in a highly efficient manner; however, that technology is manufactured with processes that could stand some improvement. The industry needs a method that is less complex, creates less waste and uses less energy. First, half the refined silicon is lost as dust in the wafer-sawing process, driving module costs higher. Wafers are sawn off of large cylindrical ingots, or boules, of silicon. A typical 2-meter boule loses as many as 6,000 potential wafers during sawing. Second, the wafers produced are much thicker than necessary. To efficiently convert sunlight into electricity, the wafers need be only one-tenth the typical thickness. NREL, the Oak Ridge National Laboratory and Ampulse have partnered on an approach to eliminate this waste and dramatically lower the cost of the finished solar panels. By using a chemical vapor deposition process to grow the silicon on inexpensive foil, Ampulse is able to make the solar cells just thick enough to convert most of the solar energy into electricity. No more sawdust - and no more wasting refined silicon materials. NREL developed the technology to grow high-quality silicon and ORNL developed the metal foil that has the correct crystal structure to support that growth. Ampulse is installing a pilot manufacturing line in NREL's Process Development Integration Laboratory, where solar companies can work closely with lab scientists on integrated equipment to answer pressing questions related to their technology development, as well as rapidly overcoming R and D challenges and risk. NREL's program is focused on transformative innovation in the domestic PV industry. With knowledge and expertise acquired from the PDIL pilot production line tools, Ampulse plans to design a full-scale production line to accommodate long rolls of metal foil. The Ampulse process 'goes straight from pure silicon-containing gas to high-quality crystal silicon film,' said Brent Nelson, the operational manager for the Process Development Integration Laboratory. 'The advantage is you can make the wafer just as thin as you need it - 10 microns or less.' Most of today's solar cells are made out of wafer crystalline silicon, though thin-film cells made of more exotic elements such as copper, indium, gallium, arsenic, cadmium, tellurium and others are making a strong push into the market. The advantage of silicon is its abundance, because it is derived from sand. Silicon's disadvantage is that purifying it into wafers suitable for solar cells can be expensive and energy intensive. Manufacturers add carbon and heat to sand to produce metallurgical-grade silicon, which is useful in other industries, but not yet suitable for making solar cells. So this metallurgical-grade silicon is then converted to pure trichlorosilane (SiCl3) or silane (SiH4) gas. Typically, the purified gas is then converted to create a silicon feedstock at 1,000 degrees Celsius. This feedstock is melted at 1,414 C and recrystallized into crystal ingots that are finally sawed into wafers. The Ampulse method differs in that it eliminates the last two steps in the traditional process and works directly with the silane gas growing only the needed silicon right onto a foil substrate. A team of NREL scientists had developed a way to use a process called hot-wire chemical vapor deposition to thicken silicon wafers with near perfect crystal structure. Using a hot tungsten filament much like the one found in an incandescent light bulb, the silane gas molecules are broken apart and deposited onto the wafer using the chemical vapor deposition technique at about 700 C - a much lower temperature than needed to make the wafer. The hot filament dec

Scanlon, B.

2012-04-01T23:59:59.000Z

435

MFR PAPER 1178 An Analysis of Increasing Costs  

E-Print Network [OSTI]

in a struggle for economic survival. The energy crisis had the most devastating impact on an industry beset owners and/or managers operating from ports in Florida, Mississippi, and Texas. Additional financial financing . Cost and re- turn estimates for 1971 used in this re- port are based on a sample of 29 vessels

436

IT infrastructure monitoring and management: Doing more with less  

E-Print Network [OSTI]

IT infrastructure monitoring and management: Doing more with less Highlights Remote managed to IT management ­ remote managed infrastructure services ­ that keeps control in the CIO's hands and frees up energy costs mean that your bills for powering and cooling servers threaten even the most well

437

Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1  

SciTech Connect (OSTI)

In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

NONE

1995-09-01T23:59:59.000Z

438

Advanced Fuel Cycle Cost Basis  

SciTech Connect (OSTI)

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

2008-03-01T23:59:59.000Z

439

Advanced Fuel Cycle Cost Basis  

SciTech Connect (OSTI)

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

2007-04-01T23:59:59.000Z

440

Shifting the Paradigm for Long Term Monitoring at Legacy Sites to Improve Performance while Reducing Costs - 13422  

SciTech Connect (OSTI)

A major issue facing many government and private industry sites that were previously contaminated with radioactive and chemical wastes is that often the sites cannot be cleaned up enough to permit unrestricted human access. These sites will require long-term management, in some cases indefinitely, leaving site owners with the challenge of protecting human health and environmental quality in a cost effective manner. Long-term monitoring of groundwater contamination is one of the largest projected costs in the life cycle of environmental management at the Savannah River Site (SRS), the larger DOE complex, and many large federal and private sites. Currently, most monitoring strategies are focused on laboratory measurements of contaminants measured in groundwater samples collected from wells. This approach is expensive, and provides limited and lagging information about the effectiveness of cleanup activities and the behavior of the residual contamination. Over the last twenty years, DOE and other federal agencies have made significant investments in the development of various types of sensors and strategies that would allow for remote analysis of contaminants in groundwater, but these approaches do not promise significant reductions in risk or cost. Scientists at SRS have developed a new paradigm to simultaneously improve the performance of long term monitoring systems while lowering the overall cost of monitoring. This alternative approach incorporates traditional point measurements of contaminant concentration with measurements of controlling variables including boundary conditions, master variables, and traditional plume/contaminant variables. Boundary conditions are the overall driving forces that control plume movement and therefore provide leading indication to changes in plume stability. These variables include metrics associated with meteorology, hydrology, hydrogeology, and land use. Master variables are the key variables that control the chemistry of the groundwater system, and include redox variables (ORP, DO, chemicals), pH, specific conductivity, biological community (breakdown/decay products), and temperature. A robust suite of relatively inexpensive tools is commercially available to measure these variables. Traditional plume/contaminant variables are various measures of contaminant concentration including traditional analysis of chemicals in groundwater samples. An innovative long term monitoring strategy has been developed for acidic or caustic groundwater plumes contaminated with metals and/or radionuclides. Not only should the proposed strategy be more effective at early identification of potential risks, this strategy should be significantly more cost effective because measurement of controlling boundary conditions and master variables is relatively simple. These variables also directly reflect the evolution of the plume through time, so that the monitoring strategy can be modified as the plume 'ages'. This transformational long-term monitoring paradigm will generate significant cost savings to DOE, other federal agencies and industry and will provide improved performance and leading indicators of environmental management performance. (authors)

Eddy-Dilek, Carol A; Looney, Brian B. [Savannah River National Laboratory (United States)] [Savannah River National Laboratory (United States); Gaughan, Thomas; Kmetz, Thomas [Savannah River Nuclear Solutions, LLC (United States)] [Savannah River Nuclear Solutions, LLC (United States); Seaman, John [Savannah River Ecology Laboratory (United States)] [Savannah River Ecology Laboratory (United States)

2013-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

An Examination of Avoided Costs in Utah  

E-Print Network [OSTI]

Subject An Examination of Avoided Costs in Utah Date Januarystate by seeking changes to the avoided cost tariff paid tomethod of calculating avoided costs that has been officially

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

442

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

Fueling stations; Cost; Shanghai; Fuel cell vehicles 1.and the delivery cost for fuel cell vehicles, however, itthus hydrogen cost therefore depend on the ?eet of fuel cell

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

443

A Second Opinion is Worth the Cost - 12479  

SciTech Connect (OSTI)

This paper, 'A Second Opinion is Worth the Cost', shows how a second opinion for a Department of Energy (DOE) Project helped prepare and pass a DOE Order 413.3A 'Program and Project Management for the acquisition of Capital Assets' Office of Engineering and Construction Management (OECM) required External Independent Review (EIR) in support of the approved baseline for Critical Decision (CD) 2. The DOE project personnel were informed that the project's Total Project Cost (TPC) was going to increase from $815 million to $1.1 billion due to unforeseen problems and unexplained reasons. The DOE Project Team determined that a second opinion was needed to review and validate the TPC. Project Time and Cost, Inc. (PT and C) was requested to evaluate the cost estimate, schedule, basis of estimate (BOE), and risk management plan of the Project and to give an independent assessment of the TPC that was presented to DOE. This paper will demonstrate how breaking down a project to the work breakdown structure (WBS) level allows a project to be analyzed for potential cost increases and/or decreases, thus providing a more accurate TPC. The review Team's cost analyses of Projects identified eight primary drivers resulting in cost increases. They included: - Overstatement of the effort required to develop drawings and specifications. - Cost allocation to 'Miscellaneous' without sufficient detail or documentation. - Cost for duplicated efforts. - Vendor estimates or quotations without sufficient detail. - The practice of using the highest price quoted then adding an additional 10% mark-up. - Application of Nuclear Quality Assurance (NQA) highest level quality requirements when not required. - Allocation of operational costs to the Project Costs instead of to the Operating Expenses (OPEX). OPEX costs come from a different funding source. - DOE had not approved the activities. By using a Team approach with professionals from cost, civil, mechanical, electrical, structural and nuclear disciplines and by performing a Line by Line, WBS element by WBS element review of the Projects' CD-2 baseline package helped the DOE Project Team experience success. The second opinion that PT and C provide by conducting a Pre-EIR review of the Project baseline package and the cost review of the TPC helped the DOE Team pass the CD-2 EIR and reduced the TPC. The Line-by-Line review of the DOE Project identified opportunities to reduce the TPC from $1.1 billion to $740.8 million, thus realizing a saving of approximately $359.2 million, or roughly 32% of the original TPC. This significant cost savings underscores the cost in obtaining the second opinion. This same Line by Line review can be applied to any DOE project in the Energy Management or Weapons complex. In the case of this DOE Project a second opinion was worth the cost. (authors)

Madsen, Drew [Project Time and Cost Inc. (United States)

2012-07-01T23:59:59.000Z

444

Public Key Cryptography and Key Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Information in this chapter of the directive has been consolidated into the Identity, Credential, and Access Management (ICAM) Program as defined in DOE O 206.2.

2013-06-11T23:59:59.000Z

445

Performance Management Plan  

SciTech Connect (OSTI)

This Performance Management Plan describes the approach for accelerating cleanup activities of U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Management (EM) Program. This approach accelerates the reduction of risk at NNSA/NV sites while performing the work responsibly, effectively, and more efficiently. In May 2002, NNSA/NV EM and the Nevada Division of Environmental Protection signed a Letter of Intent formalizing an agreement to pursue accelerated risk reduction and cleanup for activities within the State of Nevada. This Performance Management Plan provides the strategic direction for implementing the Letter of Intent.

IT Corporation, Las Vegas, NV

2002-08-21T23:59:59.000Z

446

Radioactive Waste Management Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Manual further describes the requirements and establishes specific responsibilities for implementing DOE O 435.1, Radioactive Waste Management, for the management of DOE high-level waste, transuranic waste, low-level waste, and the radioactive component of mixed waste. The purpose of the Manual is to catalog those procedural requirements and existing practices that ensure that all DOE elements and contractors continue to manage DOE's radioactive waste in a manner that is protective of worker and public health and safety, and the environment. Does not cancel other directives.

1999-07-09T23:59:59.000Z

447

Cost and Area Comparison Per Student of the Public Elementary Schools in Texas based on the Project Delivery Systems  

E-Print Network [OSTI]

student in line with A. N. Reinisch’s findings for CSP contracts in Texas, but not CMR average costs. The two ISD’s who supplied the documents were clearly concerned at cost control and appear to have managed this process. The earlier findings of a cost...

Goyal Rakesh, Sheetal

2013-08-09T23:59:59.000Z

448

Dynamic Control of Electricity Cost with Power Demand Smoothing and Peak Shaving for Distributed Internet Data Centers  

E-Print Network [OSTI]

Dynamic Control of Electricity Cost with Power Demand Smoothing and Peak Shaving for Distributed a major part of their running costs. Modern electric power grid provides a feasible way to dynamically and efficiently manage the electricity cost of distributed IDCs based on the Locational Marginal Pricing (LMP

Rahman, A.K.M. Ashikur

449

New MEA Materials for Improved DMFC Performance, Durability and Cost  

SciTech Connect (OSTI)

Abstract Project Title: New MEA Materials for Improved DMFC Performance, Durability and Cost The University of North Florida (UNF)--with project partners the University of Florida, Northeastern University, and Johnson Matthey--has recently completed the Department of Energy (DOE) project entitled “New MEA Materials for Improved DMFC Performance, Durability and Cost”. The primary objective of the project was to advance portable fuel cell MEA technology towards the commercial targets as laid out in the DOE R&D roadmap by developing a passive water recovery MEA (membrane electrode assembly). Developers at the University of North Florida identified water management components as an insurmountable barrier to achieving the required system size and weight necessary to achieve the energy density requirements of small portable power applications. UNF developed an innovative “passive water recovery” MEA for direct methanol fuel cells (DMFC) which provides a path to system simplification and optimization. The passive water recovery MEA incorporates a hydrophobic, porous, barrier layer within the cathode electrode, so that capillary pressure forces the water produced at the cathode through holes in the membrane and back to the anode. By directly transferring the water from the cathode to the anode, the balance of plant is very much simplified and the need for heavy, bulky water recovery components is eliminated. At the heart of the passive water recovery MEA is the UNF DM-1 membrane that utilizes a hydrocarbon structure to optimize performance in a DMFC system. The membrane has inherent performance advantages, such as a low methanol crossover (high overall efficiency), while maintaining a high proton conductivity (good electrochemical efficiency) when compared to perfluorinated sulfonic acid membranes such as Nafion. Critically, the membrane provides an extremely low electro-osmotic drag coefficient of approximately one water molecule per proton (versus the 2-3 for Nafion) that minimizes flooding issues at the cathode, which often fatally limit open cathode MEA performance. During this successfully completed DOE program the project team met all of the project goals. The team built and tested over 1,500 MEAs with a wide range of different manufacturing chemistries and process conditions. This project demonstrated that the UNF MEA design could be fabricated with a high degree of reproducibility and repeatability. Some specific achievements include: • Durability - The UNF MEA has demonstrated over 11,000 hours continuous operation in a short stack configuration. The root cause of an off-state degradation issue was successfully mitigated by modifying the manufacturing process by changing the wetting agents used in the catalyst printing. The stability of the anode electrode was increased by replacing the anode electrodes with a stabilized PtRu/C catalyst. The overall degradation rate was significantly reduced through optimization of the MEA operating conditions. • Performance - The project team optimized the performance of the critical MEA sub-components. By increasing the membrane thickness, the methanol crossover was reduced, thereby increasing the fuel utilization efficiency without sacrificing any electrochemical performance. The reduction in methanol crossover increased the fuel utilization efficiency from 78% to over 90%. The liquid barrier layer was optimized to provide improved reproducibility, thereby improving stack voltage uniformity and reliability. Additionally the barrier layer water permeability was lowered without sacrificing any power density, thereby enabling increased operating temperature. Improvements in the cathode catalyst selection and coating provided an additional 10% to 20% improvement in the MEA performance at the target operating range. • Cost - Commercially scalable processes were developed for all of the critical MEA components which led to improved yields and lower overall manufacturing costs. Furthermore, significant steps have been made in improving the process control, which increases MEA

Fletcher, James H. [University of North Florida; Campbell, Joseph L. [University of North Florida; Cox, Philip [University of North Florida; Harrington, William J. [University of North Florida

2013-09-16T23:59:59.000Z

450

Web-Based Software Vendor Management Application  

E-Print Network [OSTI]

At XYZ Technologies, Inc., the lack of standardized processes and tools to manage different software vendors is costing the company time and money. Visibility and the ability to track software vendor transactions are limited due to the lack of a...

Puppala, Naresh

2010-05-14T23:59:59.000Z

451

Micro economics for demand-side management  

E-Print Network [OSTI]

This paper aims to interpret Demand-Side Management (DSM) activity and to point out its problems, adopting microeconomics as an analytical tool. Two major findings follow. first, the cost-benefit analysis currently in use ...

Kibune, Hisao

1991-01-01T23:59:59.000Z

452

Operations Task Management (OTM)  

SciTech Connect (OSTI)

This paper reviews the steps taken by management at Ashland Oil to reduce expenses, including an analysis of every aspect of the refinery. It was determined that the areas most adaptable to improvement were the maintenance department, storerooms, the laboratory and energy utilization. The authors focus, however, on the difficulties met in implementing an effective cost control program in the operations area, detailing the reasons why and examining the system ultimately installed in this area.

Miller, C.B.; Duck, C.H.

1985-10-01T23:59:59.000Z

453

Thermal Energy Storage: It's not Just for Electric Cost Savings Anymore  

E-Print Network [OSTI]

Large cool Thermal Energy Storage (TES), typically ice TES or chilled water (CHW) TES, has traditionally been thought of, and used for, managing time-of-day electricity use to reduce the cost associated with electric energy and demand charges...

Andrepont, J. S.

2014-01-01T23:59:59.000Z

454

A practical method for incorporating Real Options analysis into US federal benefit-cost analysis procedures  

E-Print Network [OSTI]

This research identifies how Real Options (RO) thinking might acceptably and effectively complement the current mandates for Benefit-Cost Analysis (BCA) defined by the Office of Management and Budget (OMB) in Circular A-94. ...

Rivey, Darren

2007-01-01T23:59:59.000Z

455

Stochastic Modeling of Future Highway Maintenance Costs for Flexible Type Highway Pavement Construction Projects  

E-Print Network [OSTI]

that affect pavement performances; 2) develop a stochastic model that predicts future maintenance costs of flexible-type pavement in Texas. The study data were gathered through the Pavement Management Information System (PMIS) containing more than 190...

Kim, Yoo Hyun

2012-07-16T23:59:59.000Z

456

Power Marketing Administration Emergency Management Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish specific emergency management policy and requirements for the Department of Energy Power Marketing Administration appropriate to their specific regional power missions. This directive does not cancel another directive. Canceled by DOE M151.1-1.

1994-05-09T23:59:59.000Z

457

Lower Cost Carbon Fiber Precursors  

Broader source: Energy.gov (indexed) [DOE]

production and conversion parameters must be optimized. Lower cost fiber enable CF composite applications. Approach: 1. Complete previous effort by scaling to the CF production...

458

HTGR Cost Model Users' Manual  

SciTech Connect (OSTI)

The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

A.M. Gandrik

2012-01-01T23:59:59.000Z

459

Departmental Directives Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order is the primary directive for administering the Department's directives Program. Cancels: DOE O 251.1A

2006-08-16T23:59:59.000Z

460

SUBCONTRACT MANAGEMENT  

Energy Savers [EERE]

0-1 CHAPTER 10 SUBCONTRACT MANAGEMENT (Revised October 19, 2011) WHAT ARE THE BASIC PRINCIPLES AND OBJECTIVES OF SUBCONTRACT MANAGEMENT? 1. To ensure contractors establish,...

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Management of Heavy Isotope in the DOE Complex  

SciTech Connect (OSTI)

Currently each Department Of Energy (DOE) Program office manages its own nuclear materials through activities such as production, processing, storage, transportation, and disposition. However, recognizing the need to strengthen its strategic approach to the integrated life-cycle management of nuclear materials, DOE established the Nuclear Materials Management Stewardship Initiative (NMMSI) in January 2000. The NMMSI's first visible product was the Integrated Nuclear Material Management Plan in which it was generally recommended that DOE take a cross-cutting look at managing its nuclear materials, and specifically recommended that four Nuclear Material Management Groups (NMMGs) be formed. These groups were established to facilitate management of nuclear materials for which DOE has or may have responsibility, including many presently not in DOE's direct control. One of these NMMGs, the Heavy Isotope Management Group (HIMG) was established at Oak Ridge National Laboratory in Dec ember 2000, to facilitate management of (a) actinide and their decay products (except sealed sources) and (b) isotopically enriched stable and radioactive isotopes except uranium and lithium, but excluding thorium, uranium, spent fuel, and weapons or reactor grade plutonium which are addressed by other NMMGs. Despite its short duration and relatively limited funding, the HIMG has facilitated the disposition of heavy isotopes from Lawrence Berkeley National Laboratory (LBNL), Rocky Flats Environmental Technology Site (RFETS), Pacific Northwest National Laboratory (PNNL), Oak Ridge National Laboratory (ORNL), Lawrence Livermore National Laboratory (LLNL), and Idaho National Engineering and Environmental Laboratory (INEEL). The primary disposition options have been to facilitate reuse of valuable heavy isotopes by matching custodians of unwanted materials with other users that seek such materials for new applications. This approach has the dual advantages of avoiding custodian disposal costs plus cost to the user of obtaining newly produced material. The HIMG has also prepared issue papers on neptunium and americium/curium that identify the resources, potential uses, and disposal pathways for the materials across the DOE Complex. In the future the HIMG expects to comprehensively identify the status of the U.S. heavy isotope inventory, prepare additional issue papers and plans charting the future of this inventory, and to facilitate execution of the plan.

Canon, R.; Croff, A.; Boyd, L.

2002-02-27T23:59:59.000Z

462

Energy Management Without a Staff  

E-Print Network [OSTI]

Energj Management Without a Staff David L. Dornbos, Sr. Manager, Facilities and "Energy Engineering Dept. Steelcase Inc. Grand Rapids, Michigan Our area assigned and central engineers are encouraged to design each project with energy... efficiency and cost as important objectives. It is their contribution to the process of problem solving, renovation, equipment installation, and construction. Recommendations are expected. The hands-on engineer is in the best position to provide...

Dornbos, D. L. Sr.

463

GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION.  

SciTech Connect (OSTI)

THE DEPARTMENT OF ENERGY ORDER 5400.1, GENERAL ENVIRONMENTAL PROTECTION PROGRAM, REQUIRES THE DEVELOPMENT AND IMPLEMENTATION OF A GROUNDWATER PROTECTION PROGRAM. THE BNL GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION PROVIDES AN OVERVIEW OF HOW THE LABORATORY ENSURES THAT PLANS FOR GROUNDWATER PROTECTION, MONITORING, AND RESTORATION ARE FULLY DEFINED, INTEGRATED, AND MANAGED IN A COST EFFECTIVE MANNER THAT IS CONSISTENT WITH FEDERAL, STATE, AND LOCAL REGULATIONS.

PAQUETTE,D.E.; BENNETT,D.B.; DORSCH,W.R.; GOODE,G.A.; LEE,R.J.; KLAUS,K.; HOWE,R.F.; GEIGER,K.

2002-05-31T23:59:59.000Z

464

Hydrogen Compression, Storage, and Dispensing Cost Reduction...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Compression, Storage, and Dispensing Cost Reduction Workshop Addendum Hydrogen Compression, Storage, and Dispensing Cost Reduction Workshop Addendum Document states additional...

465

Theoretical, Methodological, and Empirical Approaches to Cost Savings: A Compendium  

SciTech Connect (OSTI)

This publication summarizes and contains the original documentation for understanding why the U.S. Department of Energy's (DOE's) privatization approach provides cost savings and the different approaches that could be used in calculating cost savings for the Tank Waste Remediation System (TWRS) Phase I contract. The initial section summarizes the approaches in the different papers. The appendices are the individual source papers which have been reviewed by individuals outside of the Pacific Northwest National Laboratory and the TWRS Program. Appendix A provides a theoretical basis for and estimate of the level of savings that can be" obtained from a fixed-priced contract with performance risk maintained by the contractor. Appendix B provides the methodology for determining cost savings when comparing a fixed-priced contractor with a Management and Operations (M&O) contractor (cost-plus contractor). Appendix C summarizes the economic model used to calculate cost savings and provides hypothetical output from preliminary calculations. Appendix D provides the summary of the approach for the DOE-Richland Operations Office (RL) estimate of the M&O contractor to perform the same work as BNFL Inc. Appendix E contains information on cost growth and per metric ton of glass costs for high-level waste at two other DOE sites, West Valley and Savannah River. Appendix F addresses a risk allocation analysis of the BNFL proposal that indicates,that the current approach is still better than the alternative.

M Weimar

1998-12-10T23:59:59.000Z

466

Minimizing Electricity Cost: Optimization of Distributed Internet Data Centers in a  

E-Print Network [OSTI]

Minimizing Electricity Cost: Optimization of Distributed Internet Data Centers in a Multi-Electricity&M University, College Station, USA Email: lx@andrew.cmu.edu Abstract--The study of Cyber-Physical System (CPS, the power management problem for minimizing the total electricity cost has been overlooked

Liu, Xue

467

Production Planning and Inventories Optimization : A Backward Approach in the Convex Storage Cost Case  

E-Print Network [OSTI]

Production Planning and Inventories Optimization : A Backward Approach in the Convex Storage Cost : Production planning, inventory management, integro-differential backward equations. 1 #12;Introduction We, and by the cost of storage of the current inventories. Our approach of this production planning and inventory

Paris-Sud XI, Université de

468

5, 14791509, 2008 Staged cost  

E-Print Network [OSTI]

HESSD 5, 1479­1509, 2008 Staged cost optimization of urban storm drainage systems M. Maharjan et al Staged cost optimization of urban storm drainage systems based on hydraulic performance in a changing optimization of urban storm drainage systems M. Maharjan et al. Title Page Abstract Introduction Conclusions

Boyer, Edmond

469

Use of Cost Estimating Relationships  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Cost Estimating Relationships (CERs) are an important tool in an estimator's kit, and in many cases, they are the only tool. Thus, it is important to understand their limitations and characteristics. This chapter discusses considerations of which the estimator must be aware so the Cost Estimating Relationships can be properly used.

1997-03-28T23:59:59.000Z

470

Cost of Service and Rate Design Issues Affecting Industrial Customers in Retail Rate Proceedings  

E-Print Network [OSTI]

alternative is not selected, or when the selected capacity expansion plan results in excess generation. A reduction in invested capital will reduce the system revenue requirements. The rate of return is equal to the sum of the weighted cost of debt plus... the position that the cost of all or part of an imprudent management decision should be borne by the stockholder. Prudency issues are usually raised when the cost of new generation units are excessive, when the most economic generation expansion...

Stover, C. N. Jr.

471

Hanford ETR- Tank Waste Treatment and Immobilization Plant- Hanford Tank Waste Treatment and Immobilization Plant Technical Review- Estimate at Completion (Cost) Report  

Broader source: Energy.gov [DOE]

This is a comprehensive review ofthe Hanford WTP estimate at completion - assessing the project scope, contract requirements, management execution plant, schedule, cost estimates, and risks.

472

Quality Management Why bother Certificating?  

E-Print Network [OSTI]

) (Prevention) (Direction) BS 5750 1979-1987 ISO 9001/2/3 1987-2000 ISO 9001 2000, amended 2008 #12;5 What RECORDS / FORMS INTENT WHAT? PROOF HOW? WHY? #12;8 ISO 9001:2008 The Structure: ISO 9001 - Q Relationships ISO 9001:2008 Based on the 8 Quality Management Principles: #12;11 Quality Management Process

Paxton, Anthony T.

473

Mobile Technology Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes requirements, assigns responsibilities, and provides guidance for federal mobile technology management and employee use of both government furnished and personally-owned mobile devices within DOE and NNSA. Establishes requirements for use of User Agreements to govern mobile devices used for official duties. Does not cancel other directives.

2014-05-15T23:59:59.000Z

474

Kostnadsstyrning i Byggprojekt; Cost management of construction project.  

E-Print Network [OSTI]

?? Föreliggande rapport är ett examensarbete vid högskoleingenjörsprogrammet i byggteknik och design vid Kungliga tekniska högskolan i Haninge och gjordes pĺ uppdrag av Siljeströms AB. Rapporten har… (more)

Björk, Veronica

2012-01-01T23:59:59.000Z

475

Energy Management and Cost Analysis in Residential Houses using Batteries  

E-Print Network [OSTI]

prices when the demand is expected to be low and higher prices when the demand is higher. Energy arbitrage leverages these different energy prices by buying the extra energy when the prices are low, storing it in an energy storage device and then using the stored energy when the price is higher. Several

Simunic, Tajana

476

Facilitating Sound, Cost-Effective Energy Management (Fact Sheet)  

SciTech Connect (OSTI)

FEMP focuses on the needs of its Federal customers, delivering an array of products grouped into project transaction services, applied technology services, and decision support services. This document outlines FEMP services and programs.

Not Available

2011-04-01T23:59:59.000Z

477

Facilitating Sound, Cost-Effective Energy Management (Fact Sheet)  

SciTech Connect (OSTI)

FEMP focuses on the needs of its Federal customers, delivering an array of products grouped into project transaction services, applied technology services, and decision support services. This document outlines FEMP services and programs.

Not Available

2011-07-01T23:59:59.000Z

478

Optimal Power Cost Management Using Stored Energy in Data Centers  

E-Print Network [OSTI]

such as diesel generators. We consider the problem of opportunistically using these devices to reduce the time are not made or distributed for profit or commercial advantage and that copies bear this notice and the full

Neely, Michael J.

479

Audit of Management and Operating Contractor Overtime Costs, IG-0381  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3--Logistical5/08 Attendance List1-02Evaluation Report TheU.S. DEPARTMENT

480

Designing Cost Effective Demand Management Contracts using Game Theory  

E-Print Network [OSTI]

. Alvarado1 Department of Electrical and Computer Engineering The University of Wisconsin ­ Madison Report Mechanism Design Mechanism design and the revelation principle are key concepts from nonlinear pric- ing

Note: This page contains sample records for the topic "management direct cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

LowerLower--Cost Fuel CellsCost Fuel Cells Allen J. Bard, Arumugam Manthiram,Allen J. Bard, Arumugam Manthiram,  

E-Print Network [OSTI]

density 4 Hydrogen polymer electrolyteHydrogen polymer electrolyte membrane fuel cell (PEMFC)membrane fuel1 LowerLower--Cost Fuel CellsCost Fuel Cells Allen J. Bard, Arumugam Manthiram,Allen J. BardMaterials Science and Engineering Program 2 CONVENTIONAL POWER PLANT DIRECT FUEL CELL POWER PLANT Heat

Lightsey, Glenn

482

Validation and Comparison of Carbon Sequestration Project Cost Models with Project Cost Data Obtained from the Southwest Partnership  

SciTech Connect (OSTI)

Obtaining formal quotes and engineering conceptual designs for carbon dioxide (CO{sub 2}) sequestration sites and facilities is costly and time-consuming. Frequently, when looking at potential locations, managers, engineers and scientists are confronted with multiple options, but do not have the expertise or the information required to quickly obtain a general estimate of what the costs will be without employing an engineering firm. Several models for carbon compression, transport and/or injection have been published that are designed to aid in determining the cost of sequestration projects. A number of these models are used in this study, including models by J. Ogden, MIT's Carbon Capture and Sequestration Technologies Program Model, the Environmental Protection Agency and others. This report uses the information and data available from several projects either completed, in progress, or conceptualized by the Southwest Regional Carbon Sequestration Partnership on Carbon Sequestration (SWP) to determine the best approach to estimate a project's cost. The data presented highlights calculated versus actual costs. This data is compared to the results obtained by applying several models for each of the individual projects with actual cost. It also offers methods to systematically apply the models to future projects of a similar scale. Last, the cost risks associated with a project of this scope are discussed, along with ways that have been and could be used to mitigate these risks.

Robert Lee; Reid Grigg; Brian McPherson

2011-04-15T23:59:59.000Z

483

Conference Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish requirements and responsibilities with respect to managing conferences sponsored by the Department of Energy (DOE) or by DOE management and operating contractors and other contractors who perform work at DOE-owned or -leased facilities, including management and integration contractors and environmental restoration management contractors (when using funds that will be reimbursed by DOE). Cancels DOE N 110.3.

1999-11-03T23:59:59.000Z

484

Control strategy for hydrocarbon emissions in turbocharged direct injection spark ignition engines during cold-start  

E-Print Network [OSTI]

Gasoline consumption and pollutant emissions from transportation are costly and have serious, demonstrated environmental and health impacts. Downsized, turbocharged direct-injection spark ignition (DISI) gasoline engines ...

Cedrone, Kevin David

2013-01-01T23:59:59.000Z

485

OM300 Direction Drilling Module  

SciTech Connect (OSTI)

OM300 – Geothermal Direction Drilling Navigation Tool: Design and produce a prototype directional drilling navigation tool capable of high temperature operation in geothermal drilling Accuracies of 0.1° Inclination and Tool Face, 0.5° Azimuth Environmental Ruggedness typical of existing oil/gas drilling Multiple Selectable Sensor Ranges High accuracy for navigation, low bandwidth High G-range & bandwidth for Stick-Slip and Chirp detection Selectable serial data communications Reduce cost of drilling in high temperature Geothermal reservoirs Innovative aspects of project Honeywell MEMS* Vibrating Beam Accelerometers (VBA) APS Flux-gate Magnetometers Honeywell Silicon-On-Insulator (SOI) High-temperature electronics Rugged High-temperature capable package and assembly process

MacGugan, Doug

2013-08-22T23:59:59.000Z

486

Cost of meeting geothermal liquid effluent disposal regulations  

SciTech Connect (OSTI)

Background information is presented on the characteristics of liquid wastes and the available disposal options. Regulations that may directly or indirectly influence liquid waste disposal are reviewed. An assessment of the available wastewater-treatment systems is provided. A case study of expected liquid-waste-treatment and disposal costs is summarized. (MHR)

Wells, K.D.; Currie, J.W.; Price, B.A.; Rogers, E.A.

1981-06-01T23:59:59.000Z

487

Fuel Cell System Cost for Transportation-2008 Cost Estimate (Book)  

SciTech Connect (OSTI)

Independent review prepared for the U.S. Department of Energy (DOE) Hydrogen, Fuel Cells and Infrastructure Technologies (HFCIT) Program Manager.

Not Available

2009-05-01T23:59:59.000Z

488

User's manual for the INDCEPT code for estimating industrial steam boiler plant capital investment costs  

SciTech Connect (OSTI)

The INDCEPT computer code package was developed to provide conceptual capital investment cost estimates for single- and multiple-unit industrial steam boiler plants. Cost estimates can be made as a function of boiler type, size, location, and date of initial operation. The output includes a detailed breakdown of the estimate into direct and indirect costs. Boiler plant cost models are provided to reflect various types and sources of coal and alternate means of sulfur and particulate removal. Cost models are also included for low-Btu and medium-Btu gas produced in coal gasification plants.

Bowers, H I; Fuller, L C; Hudson, II, C R

1982-09-01T23:59:59.000Z

489

Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)  

SciTech Connect (OSTI)

The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford`s environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO{sub 3} plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996).

Higginson, M.C.

1994-10-01T23:59:59.000Z

490

Incentive Rates- At What Cost?  

E-Print Network [OSTI]

with interruptible services. Instead, I filed "ISB" which was priced slightly above the marginal fuel cost on a time of use basis. Many of the periods of the year the first year that I proposed that rate, the cost of interruptible would have been higher than... forms centers on four issues; cost scope of the topic, so let me describe what I feel based pricing, discrimination, competition between is an incentive rate. My view is likely to strike utilities, and effectiveness. You've already some of you...

Schaeffer, S. C.

491

Sandia National Laboratories: Water Availability, Cost, and Use  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

InterconnectsWater Availability, Cost, and Use Water Availability, Cost, and Use Water Availability, Cost, and Use Water Availability, Cost, and Use Availability, cost, and...

492

Whole Building Cost and Performance Measurement: Data Collection Protocol Revision 2  

SciTech Connect (OSTI)

This protocol was written for the Department of Energy’s Federal Energy Management Program (FEMP) to be used by the public as a tool for assessing building cost and performance measurement. The primary audiences are sustainable design professionals, asset owners, building managers, and research professionals within the Federal sector. The protocol was developed based on the need for measured performance and cost data on sustainable design projects. Historically there has not been a significant driver in the public or private sector to quantify whole building performance in comparable terms. The deployment of sustainable design into the building sector has initiated many questions on the performance and operational cost of these buildings.

Fowler, Kimberly M.; Spees, Kathleen L.; Kora, Angela R.; Rauch, Emily M.; Hathaway, John E.; Solana, Amy E.

2009-03-27T23:59:59.000Z

493

Cost Analysis of NEMO Protocol Entities Md. Shohrab Hossain, Mohammed Atiquzzaman, William Ivancic  

E-Print Network [OSTI]

analytical models to estimate total costs of key mobility management entities of NEMO. We have presented, mobility management. I. INTRODUCTION To ensure continuous Internet connectivity of net- works in motion. As the next-generation wireless/mobile network will be a unified network based on all-IP technology

Atiquzzaman, Mohammed

494

Electricity transmission congestion costs: A review of recent reports  

SciTech Connect (OSTI)

Recently, independent system operators (ISOs) and others have published reports on the costs of transmission congestion. The magnitude of congestion costs cited in these reports has contributed to the national discussion on the current state of U.S. electricity transmission system and whether it provides an adequate platform for competition in wholesale electricity markets. This report reviews reports of congestion costs and begins to assess their implications for the current national discussion on the importance of the U.S. electricity transmission system for enabling competitive wholesale electricity markets. As a guiding principle, we posit that a more robust electricity system could reduce congestion costs; and thereby, (1) facilitate more vibrant and fair competition in wholesale electricity markets, and (2) enable consumers to seek out the lowest prices for electricity. Yet, examining the details suggests that, sometimes, there will be trade-offs between these goals. Therefore, it is essential to understand who pays, how much, and how do they benefit in evaluating options (both transmission and non-transmission alternatives) to address transmission congestion. To describe the differences among published estimates of congestion costs, we develop and motivate three ways by which transmission congestion costs are calculated in restructured markets. The assessment demonstrates that published transmission congestion costs are not directly comparable because they have been developed to serve different purposes. More importantly, critical information needed to make them more comparable, for example in order to evaluate the impacts of options to relieve congestion, is sometimes not available.

Lesieutre, Bernard C.; Eto, Joseph H.

2003-10-01T23:59:59.000Z

495

Title: Space Management --Requests for Space Renovations and Changes in the Use of Space  

E-Print Network [OSTI]

president, the Director of Space Management will request a cost estimate from Facilities Management. 4. With the cost estimate in hand, the cognizant vice president and the Director of Space Management will undertake's Capital Budget. Vice presidents are encouraged to assign priorities to the projects in their areas. 6. Or

Huang, Jianyu

496

Energy management handbook. Second edition  

SciTech Connect (OSTI)

Separate abstracts were prepared for 25 chapters of this book. Written by a team of professionals in response to steadily accelerating energy costs, this fact-packed guide is designed as a practical, stand alone reference for those responsible for managing energy costs. The second edition has been completely updated, and is published in an expanded format for easier reference. In it is all the data and information needed to design and implement a successful energy management program for businesses, commercial buildings and industrial plants. By applying the simple principles and techniques contained in the handbook, it is possible to realize a cost savings of 15-30% and some companies have achieved as much as 60% savings.

Turner, W.C.

1993-01-01T23:59:59.000Z

497

Cost-Effective Cable Insulation: Nanoclay Reinforced Ethylene-Propylene-Rubber for Low-Cost HVDC Cabling  

SciTech Connect (OSTI)

GENI Project: GE is developing new, low-cost insulation for high-voltage direct current (HVDC) electricity transmission cables. The current material used to insulate HVDC transmission cables is very expensive and can account for as much as 1/3 of the total cost of a high-voltage transmission system. GE is embedding nanomaterials into specialty rubber to create its insulation. Not only are these materials less expensive than those used in conventional HVDC insulation, but also they will help suppress excess charge accumulation. The excess charge left behind on a cable poses a major challenge for high-voltage insulation—if it’s not kept to a low level, it could ultimately lead the insulation to fail. GE’s low-cost insulation is compatible with existing U.S. cable manufacturing processes, further enhancing its cost effectiveness.

None

2012-02-24T23:59:59.000Z

498

The structure of energy management systems  

SciTech Connect (OSTI)

Energy management systems (EMS) which serve a variety of building functions are a complex combination of hardware and software. The design of the system is a trade-off between different characteristics including functions performed, number of connected points, cost, compatibility with other systems, reliability and flexibility. The functions performed by the EMS vary significantly with respect to complexity, interaction and rate of response required. The majority of functions interact either directly or indirectly with each other. The data required to support EMS functions can be classed as status, control, qualifying and informational. The amount of data required is extensive and must be brought together in many combinations to achieve the desired performance. The transfer of data is carried out by a communication system which connects the components of the EMS. The communication requirements, in addition to functional performance, are influenced by the application flexibility desired and the level of distribution of the system. Three general distribution levels are centralized, status and control decentralized, and functionally decentralized. The ability of the EMS of one manufacturer to interact effectively with EMS components or complete systems of other manufacturers is limited by the respective selections for data structures, communication methods and level of distribution. In general, the unique selection of characteristics chosen by each manufacturer precludes the integration of energy management system components of different manufacturers unless details of implementation are known.

Miller, D.E.

1983-06-01T23:59:59.000Z

499

Variation of direct-heat geothermal economics with project size  

SciTech Connect (OSTI)

A comparision of the economics of large, intermediate, and small direct-heat goethermal projects is presented. An attempt is made to define which types of direct-heat geothermal projects are most cost-efficient and produce the most energy for the least amount of money. The potential energy contribution of fourteen different sizes of direct heat projects is used to determine the number of projects of a given size required to produce 1 Quad of energy. The cost of developing 1 Quad of direct-heat geothermal energy from large, intermediate, and small projects is compared to the cost of 1 Quad of energy from conventional sources. The engineering and resource parameters controlling project size are defined. The development of large-scale projects is stressed as the way in which direct-heat geothermal energy can make the most significant contribution to the nation's energy requirements. (MJF)

Struhsacker, D.W.

1981-10-01T23:59:59.000Z

500

Mandatory Photovoltaic System Cost Estimate  

Broader source: Energy.gov [DOE]