Sample records for management direct cost

  1. Comparison of management, overhead, and direct costs of six projects managed by the Department of Energy and Government-Owned, Contractor-Operated Laboratories

    SciTech Connect (OSTI)

    Not Available

    1981-09-30T23:59:59.000Z

    The report covers management, overhead, and direct cost data on six DOE projects - three managed directly by DOE, and three managed for DOE by government-owned, contractor-operated (GOCO) laboratories. These data provide comparison for decisions on contracting out for project management services. (GHT)

  2. Direct/Indirect Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

  3. Target Cost Management Strategy

    E-Print Network [OSTI]

    Okano, Hiroshi

    1996-01-01T23:59:59.000Z

    Target cost management (TCM) is an innovation of Japanese management accounting system and by common sense has been considered with great interest by practitioners. Nowadays, TCM related

  4. A Manager's Approach to Energy Cost Management

    E-Print Network [OSTI]

    Spencer, R. J.

    A major responsibility of management is the control and containment of operating costs. Energy costs are a major portion of the industrial budget. GM has developed a 3 phase approach to energy conservation. Phase I -Administrative Controls...

  5. Estimating Specialty Costs - DOE Directives, Delegations, and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    project specialty costs and methods of estimating costs for specialty projects. g4301-1chp20.pdf -- PDF Document, 56 KB Writer: John Makepeace Subjects: Administration Management...

  6. Startup Costs - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and environmental projects, and estimating guidance for startup costs. g4301-1chp8.pdf -- PDF Document, 8 KB Writer: John Makepeace Subjects: Administration Management...

  7. Managing asbestos: Ten costly sins

    SciTech Connect (OSTI)

    Denson, F.A.; Onderick, W.A.

    1993-01-01T23:59:59.000Z

    This article describes how to build an ongoing, continuous, and improved asbestos management program. Asbestos management is one of the toughest jobs facing a plant or environmental engineer today; even seasoned engineers can make mistakes. Much confusion exists about how best to manage this issue, especially in plant settings. Whether the company is small, medium, or large, asbestos has the power to steal from profits if not managed properly. To help POWER readers examine their current asbestos management programs, here are 10 common errors that could be stopped or avoided by practicing preventive techniques. The 10 costly sins presented are not mutually exclusive, and they certainly are not all-inclusive. They are offered as a way to stimulate ideas on how to build an ongoing, continuous, and improved asbestos management program. These include Sin 1: No written policy. Sin 2: Lack of corporate guidance. Sin 3: Not complying with regulations. Sin 4: Not worrying about other respirable fibers. Sin 5: Lawsuits--not culpable. Sin 6: No visible emissions, no problems. Sin 7: Managing asbestos manually.

  8. Direct/Indirect Costs - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (CCMD) and describes various estimating techniques for direct and indirect costs. g4301-1chp7.pdf -- PDF Document, 41 KB Writer: John Makepeace Subjects: ID: DOE G 430.1-1 Chp 7...

  9. Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive Applications: Fuel Cell Tech Team Review Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive...

  10. FACILITIES AND ADMINISTRATIVE (F&A) COST AND IDC RATES The cost of conducting research consists of two broad types of costs direct costs and facilities and

    E-Print Network [OSTI]

    Keinan, Alon

    FACILITIES AND ADMINISTRATIVE (F&A) COST AND IDC RATES The cost of conducting research consists of two broad types of costs ­ direct costs and facilities and administrative costs (F&A), also known as indirect costs. Direct

  11. INDIRECT COST CALCULATION [IN REVERSE] YOU WANT TO CALCULATE THE DIRECT COSTS

    E-Print Network [OSTI]

    Finley Jr., Russell L.

    INDIRECT COST CALCULATION [IN REVERSE] YOU WANT TO CALCULATE THE DIRECT COSTS YOU KNOW WHAT THE TUITION, STIPEND AND EQUIPMENT COSTS ARE YOU KNOW WHAT THE TOTAL COST IS CALCULATION IS USING THE 2010 FED F&A RATE FOR WSU OF 52% (.52) [ DIRECT COST ­ TUITION ­ STIPEND ­ EQUIPMENT] (.52 ) + DIRECT

  12. HEALTHIER WISCONSIN PARNTERSHIP PROGRAM Direct, Indirect and Unallowable Costs

    E-Print Network [OSTI]

    HEALTHIER WISCONSIN PARNTERSHIP PROGRAM Direct, Indirect and Unallowable Costs Direct and Indirect Costs The decision of whether a cost is direct or indirect is based on the ability to specifically identify the cost with the project, rather than on the nature of the goods and services. Failure to mention

  13. ORNL: Low-Cost Direct Bonded Aluminum (DBA) Substrates (Agreement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ORNL: Low-Cost Direct Bonded Aluminum (DBA) Substrates (Agreement ID:23278) ORNL: Low-Cost Direct Bonded Aluminum (DBA) Substrates (Agreement ID:23278) 2013 DOE Hydrogen and Fuel...

  14. Cost Model and Cost Estimating Software - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is basically a cost model, which forms the basis for estimating software. g4301-1chp22.pdf -- PDF Document, 190 KB Writer: John Makepeace Subjects: Administration...

  15. Check Estimates and Independent Costs - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    estimates and their procedures and various types of independent cost estimates. g4301-1chp13.pdf -- PDF Document, 33 KB Writer: John Makepeace Subjects: Administration Management...

  16. Types of Cost Estimates - DOE Directives, Delegations, and Requirement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CURRENT DOE G 430.1-1 Chp 4, Types of Cost Estimates by John Makepeace Functional areas: Procurement, Project Management The chapter describes the estimates required on...

  17. Weed Management Costs, Weed Best Management Practices, and The Roundup Ready Weed Management Program

    E-Print Network [OSTI]

    Mitchell, Paul D.

    substantially increase weed management costs and so discourage adoption. This paper uses survey results: glyphosate, resistance management, BMP adoption, telephone survey, herbicide #12;2 INTRODUCTION Roundup ReadyWeed Management Costs, Weed Best Management Practices, and The Roundup Ready® Weed Management

  18. Extending Quality Management to Utility Costs

    E-Print Network [OSTI]

    Holmes, W. A.

    By installing permanent instrumentation and linking it to the appropriate software, a Utility Cost Management Information System, can be created which will identify where, when and how energy is used in a facility on a dynamic and real-time basis...

  19. Waste Management Facilities Cost Information Report

    SciTech Connect (OSTI)

    Feizollahi, F.; Shropshire, D.

    1992-10-01T23:59:59.000Z

    The Waste Management Facility Cost Information (WMFCI) Report, commissioned by the US Department of Energy (DOE), develops planning life-cycle cost (PLCC) estimates for treatment, storage, and disposal facilities. This report contains PLCC estimates versus capacity for 26 different facility cost modules. A procedure to guide DOE and its contractor personnel in the use of estimating data is also provided. Estimates in the report apply to five distinctive waste streams: low-level waste, low-level mixed waste, alpha contaminated low-level waste, alpha contaminated low-level mixed waste, and transuranic waste. The report addresses five different treatment types: incineration, metal/melting and recovery, shredder/compaction, solidification, and vitrification. Data in this report allows the user to develop PLCC estimates for various waste management options.

  20. Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen PEM Fuel Cell Systems for Transportation Applications: 2012 Update Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell Systems for Transportation...

  1. Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation of Direct H 2 PEM Fuel Cell Systems for Transportation Applications: 2012 Update October 18, 2012 Prepared By: Brian D. James Andrew B. Spisak...

  2. Records Management Vice-Chancellor's Directive 1 Records Management Vice-Chancellor's Directive

    E-Print Network [OSTI]

    University of Technology, Sydney

    Records Management Vice-Chancellor's Directive 1 Records Management Vice-Chancellor's Directive-Chancellor's Directive Privacy Management Plan Intellectual Property Policy UTS Records Management Procedures Privacy Access) Act 2009 (NSW) (GIPA Act) File number UR07/1205 Superseded documents Records Management Vice

  3. Development of subcontractor indirect cost and other direct cost at the DOE Fernald Site

    SciTech Connect (OSTI)

    Cossman, R.L. [Jacobs Engineering Group, Inc., Pasadena, CA (United States)

    1994-11-18T23:59:59.000Z

    The Fernald Environmental Restoration Management Corporation (FERMCO) took great strides in the development of cost estimates at Fernald. There have been many opportunities to improve on how the policies and procedures pertaining to cost estimates were to be implemented. As FERMCO took over the existing Fernald facility, the Project Controls Division began to format the estimating procedures and tools to do business at Fernald. The Estimating Department looked at the problems that pre-existed at the site. One of the key problems that FERMCO encountered was how to summarized the direct and indirect accounts of each subcontracted estimate. Direct costs were broken down by prime and sub-prime accounts. This presented a level of detail that had not been experienced at the site before; it also created many issues concerning accounts and definitions to be applied to ``all other accounts associated with a project.`` Existing subcontract indirect cost accounts were reviewed from existing historical estimates. It was found that some were very detailed and some were not. The Estimating Department was given the task of standardizing the accounts and percentages for each of the subcontractor indirect costs. Then, as the project progressed, the percentages could be revised with actual estimates, subcontract comparisons, or with level of effort (LOE) accounts, which would represent qualified people assigned a task for the completion of each project. The approach is to assign particular employees to perform a specific task within a project from start to finish, and then to reassign the individual(s) to a new project (if it was available) integrating the expertise available with the skills required by the other operable units.

  4. Operating Costs - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    that all elements of the project have been considered and properly estimated. g4301-1chp9.pdf -- PDF Document, 14 KB Writer: John Makepeace Subjects: Administration Management...

  5. Strategic cost management in a global supply chain

    E-Print Network [OSTI]

    Rao, Venkatesh G. (Venkatesh Gopalkrishna), 1971-

    2004-01-01T23:59:59.000Z

    In the face of an economic downturn, cost has become a focal point of supply chain management. Cost management is increasingly being recognized as a vital core competency needed for survival. As companies transition from ...

  6. Example Cost Codes for Construction Projects - DOE Directives...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and their corresponding cost codes that may be used for construction projects. g4301-1chp16.pdf -- PDF Document, 93 KB Writer: John Makepeace Subjects: Administration Management...

  7. Cost Codes and the Work Breakdown Structure - DOE Directives...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WBS and the cost code system, and explains the interface between the two systems. g4301-1chp5.pdf -- PDF Document, 44 KB Writer: John Makepeace Subjects: Administration Management...

  8. Life Cycle Cost Estimate - DOE Directives, Delegations, and Requiremen...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    chapter discusses life cycle costs and the role they play in planning. g4301-1chp23.pdf -- PDF Document, 52 KB Writer: John Makepeace Subjects: Administration Management...

  9. Activity Based Costing - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    outlines the Activity Based Costing method and discusses applicable uses of ABC. g4301-1chp24.pdf -- PDF Document, 11 KB Writer: John Makepeace Subjects: Administration Management...

  10. Use of Cost Estimating Relationships - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    must be aware so the Cost Estimating Relationships can be properly used. g4301-1chp18.pdf -- PDF Document, 41 KB Writer: John Makepeace Subjects: Administration Management...

  11. Enforcement Project Management Handbook. Directive

    SciTech Connect (OSTI)

    Not Available

    1991-01-01T23:59:59.000Z

    The handbook has been prepared as a basic reference and training manual to assist RPMs (Remedial Project Managers) and OSCs (On-Scene Coordinators) in planning, negotiating, and managing various enforcement actions.

  12. Managing County Employee Health Care Costs The Problem

    E-Print Network [OSTI]

    Managing County Employee Health Care Costs The Problem If food costs increased at same rate as health care, one dozen eggs would cost $80.20! 87.5% of health-care claims are due to employees cholesterol, and inactivity. Costs include unnecessary use of health-care services: 25% of doctor visits

  13. Department of Energy Environmental Management cost infrastructure development program: Cost analysis requirements

    SciTech Connect (OSTI)

    Custer, W.R. Jr.; Messick, C.D.

    1996-03-31T23:59:59.000Z

    This report was prepared to support development of the Department of Energy Environmental Management cost infrastructure -- a new capability to independently estimate and analyze costs. Currently, the cost data are reported according to a structure that blends level of effort tasks with product and process oriented tasks. Also. the budgetary inputs are developed from prior year funding authorizations and from contractor-developed parametric estimates that have been adjusted to planned funding levels or appropriations. Consequently, it is difficult for headquarters and field-level activities to use actual cost data and technical requirements to independently assess the costs generated and identify trends, potential cost savings from process improvements, and cost reduction strategies.

  14. Understanding the Costs of Business Process Management Technology

    E-Print Network [OSTI]

    Ulm, Universität

    Understanding the Costs of Business Process Management Technology Bela Mutschler and Manfred the interplay of technological, orga- nizational, and project-specific BPM cost factors as well as simulation. However, introduc- ing BPM approaches in enterprises is associated with significant costs. Though ex

  15. Waste management facilities cost information for hazardous waste. Revision 1

    SciTech Connect (OSTI)

    Shropshire, D.; Sherick, M.; Biagi, C.

    1995-06-01T23:59:59.000Z

    This report contains preconceptual designs and planning level life-cycle cost estimates for managing hazardous waste. The report`s information on treatment, storage, and disposal modules can be integrated to develop total life-cycle costs for various waste management options. A procedure to guide the US Department of Energy and its contractor personnel in the use of cost estimation data is also summarized in this report.

  16. Energy costs continue to rise. Examining ways to managing equipment energy costs.

    E-Print Network [OSTI]

    Goodman, Robert M.

    for Motors Calculating Annual Energy Use and Cost Input Power (kW)______________ Annual Energy UseEnergy costs continue to rise. Examining ways to managing equipment energy costs. Energy Use in comparing products. where where range of conditions. #12;operating conditions over a season. power

  17. Environmental management requirements/defensible costs project. Final report

    SciTech Connect (OSTI)

    NONE

    1996-02-01T23:59:59.000Z

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  18. 1366 Direct Wafer: Demolishing the Cost Barrier for Silicon Photovoltaics

    SciTech Connect (OSTI)

    Lorenz, Adam [1366 Technologies] [1366 Technologies

    2013-08-30T23:59:59.000Z

    The goal of 1366 Direct Wafer™ is to drastically reduce the cost of silicon-based PV by eliminating the cost barrier imposed by sawn wafers. The key characteristics of Direct Wafer are 1) kerf-free, 156-mm standard silicon wafers 2) high throughput for very low CAPEX and rapid scale up. Together, these characteristics will allow Direct Wafer™ to become the new standard for silicon PV wafers and will enable terawatt-scale PV – a prospect that may not be possible with sawn wafers. Our single, high-throughput step will replace the expensive and rate-limiting process steps of ingot casting and sawing, thereby enabling drastically lower wafer cost. This High-Impact PV Supply Chain project addressed the challenges of scaling Direct Wafer technology for cost-effective, high-throughput production of commercially viable 156 mm wafers. The Direct Wafer process is inherently simple and offers the potential for very low production cost, but to realize this, it is necessary to demonstrate production of wafers at high-throughput that meet customer specifications. At the start of the program, 1366 had demonstrated (with ARPA-E funding) increases in solar cell efficiency from 10% to 15.9% on small area (20cm2), scaling wafer size up to the industry standard 156mm, and demonstrated initial cell efficiency on larger wafers of 13.5%. During this program, the throughput of the Direct Wafer furnace was increased by more than 10X, simultaneous with quality improvements to meet early customer specifications. Dedicated equipment for laser trimming of wafers and measurement methods were developed to feedback key quality metrics to improve the process and equipment. Subsequent operations served both to determine key operating metrics affecting cost, as well as generating sample product that was used for developing downstream processing including texture and interaction with standard cell processing. Dramatic price drops for silicon wafers raised the bar significantly, but the developments made under this program have increased 1366 confidence that Direct Wafers can be produced for ~$0.10/W, still nearly 50% lower than current industry best practice. Wafer quality also steadily improved throughout the program, both in electrical performance and geometry. The improvements to electrical performance were achieved through a combination of optimized heat transfer during growth, reduction of metallic impurities to below 10 ppbw total metals, and lowering oxygen content to below 2e17 atoms/cc. Wafer average thickness has been reduced below 200µm with standard deviation less than 20µm. Measurement of spatially varying thickness shortly after wafer growth is being used to continually improve uniformity by adjusting thermal conditions. At the conclusion of the program, 1366 has developed strong relationships with four leading Tier1 cell manufactures and several have demonstrated 17% cell efficiency on Direct Wafer. Sample volumes were limited, with the largest trial consisting of 300 Direct Wafers, and there remains strong pull for larger quantities necessary for qualification before sales contracts can be signed. This will be the focus of our pilot manufacturing scale up in 2014.

  19. Lean Supply Chain Management Value Stream Mapping & Logistics Costs Tracking

    E-Print Network [OSTI]

    Dalang, Robert C.

    Lean Supply Chain Management Value Stream Mapping & Logistics Costs Tracking Supply Chain (physical, informational, financial) in order to have better insight on the logistics costs and the transit Stream Mapping method. The analysis is mainly focused on the global logistics and the production planning

  20. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Application This presentation reports on the status of mass production cost...

  1. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Applications: 2007 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update This report estimates fuel cell system cost...

  2. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Broader source: Energy.gov (indexed) [DOE]

    Application Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Application This report estimates fuel cell system cost for systems produced in the...

  3. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Broader source: Energy.gov (indexed) [DOE]

    07 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update This report estimates fuel cell system cost for systems...

  4. Managing Server Energy and Operational Costs in Hosting Centers

    E-Print Network [OSTI]

    Lu, Jiaheng

    is the growing importance of energy/power consumption of these servers at the hosting centers, in termsManaging Server Energy and Operational Costs in Hosting Centers Yiyu Chen Dept. of IE Penn State.00. General Terms: Design, Performance Keywords: Energy Management, Performance Modeling, Feed- back Control

  5. Risk management: Reducing brownfield cleanup costs

    SciTech Connect (OSTI)

    Graves, N.

    1997-08-01T23:59:59.000Z

    Balancing environmental protection with economic vitality is crucial to maintaining competitiveness in world markets. One key initiative that has been identified as important to both environmental protection and the economy is the redevelopment of brownfields. Brownfield redevelopment can stimulate local economies that have been devastated by lost jobs and can recycle industrial land use, thereby preserving undeveloped lands. Many existing brownfield sites appear on the US Environmental Protection Agency`s (EPA) National Priority List (NPL), which designates over 1200 sites and is expected to grow to more than 2000 by the end of the decade. EPA estimates the cost of remediating the sites on the current list will approach $30 billion, with the average cost of remediating a site close to $25 million. Thousands of additional brownfield sites that do not appear on the NPL are listed under state cleanup programs.

  6. Computerized management report system for monitoring manpower and cost

    SciTech Connect (OSTI)

    Bullington, V.R.; Stephenson, R.L.; Cardwell, R.G.

    1980-04-01T23:59:59.000Z

    Although most cost systems offer complete detail and traceability, not all provide timely detail in a concise form useful to senior management. This system was developed for a multifunction research organization funded from many sources. It extracts cost and manpower data from the general cost systems, summarizes it, compares it by program with previous cost periods, and presents it with minimum detail yet with maximum overview. The system monitors the basic manpower distribution of effort at the source, that is, the division time-card input. Cost data are taken from the central computer ahead of the print-out and report-distribution steps; thus, the summary information is available several days ahead of the detailed reports. This procedure has been regularly used for several months, and has proven to be a valuable tool in management action and planning. 9 figures.

  7. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2008 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for...

  8. Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation Applications: 2013 Update Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems...

  9. The External Damage Cost of Direct Noise From Motor Vehicles

    E-Print Network [OSTI]

    Delucchi, Mark A.; Hsu, Shi-Ling

    1996-01-01T23:59:59.000Z

    is not an external or unaccounted-for cost of highways ifland, then there is an unaccounted- for cost of highway use;

  10. Facilitating Sound, Cost-Effective Federal Energy Management (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-03-01T23:59:59.000Z

    This fact sheet is an overview of the U.S. Department of Energy's Federal Energy Management Program (FEMP). The Federal Government, as the nation's largest energy consumer, has a tremendous opportunity and acknowledged responsibility to lead by example. The U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP) plays a critical role in this effort. FEMP facilitates the Federal Government's implementation of sound, cost-effective energy management and investment practices to enhance the nation's energy security and environmental stewardship. FEMP does this by focusing on the needs of its Federal customers, delivering an array of services across a variety of program areas.

  11. Optimal Power Cost Management Using Stored Energy in Data Centers

    E-Print Network [OSTI]

    Giles, C. Lee

    Optimal Power Cost Management Using Stored Energy in Data Centers Rahul Urgaonkar, Bhuvan Urgaonkar of uninterrupted power supply (UPS) units as energy storage devices. This rep- resents a deviation from the usual average electric utility bill in a data center. Us- ing the technique of Lyapunov optimization, we develop

  12. Optimal Power Cost Management Using Stored Energy in Data Centers

    E-Print Network [OSTI]

    Urgaonkar, Bhuvan

    the aver- age price of 1 MW-Hour of electricity. Consequently, mini- mization of energy consumption needOptimal Power Cost Management Using Stored Energy in Data Centers Rahul Urgaonkar, Bhuvan Urgaonkar that arise by the use of uninterrupted power supply (UPS) units as energy storage devices. This rep- resents

  13. Starship Sails Propelled by Cost-Optimized Directed Energy

    E-Print Network [OSTI]

    Benford, James

    2011-01-01T23:59:59.000Z

    Microwave propelled sails are a new class of spacecraft using photon acceleration. It is the only method of interstellar flight that has no physics issues. Laboratory demonstrations of basic features of beam-driven propulsion, flight, stability ('beam-riding'), and induced spin, have been completed in the last decade, primarily in the microwave. It offers much lower cost probes after a substantial investment in the launcher. Engineering issues are being addressed by other applications: fusion (microwave, millimeter and laser sources) and astronomy (large aperture antennas). There are many candidate sail materials: carbon nanotubes and microtrusses, graphene, beryllium, etc. For acceleration of a sail, what is the cost-optimum high power system? Here the cost is used to constrain design parameters to estimate system power, aperture and elements of capital and operating cost. From general relations for cost-optimal transmitter aperture and power, system cost scales with kinetic energy and inversely with sail di...

  14. DIRECT COSTS OF DISABLING WORKPLACE INJURIES GROW 2.5 PERCENT

    Broader source: Energy.gov [DOE]

    April 7, 2003 Annual Liberty Mutual Workplace Safety Index Shows Direct Costs of the Three Leading Causes of Workplace Incidents Grew Significantly Faster...

  15. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation for Direct H 2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update February 29, 2008 Final Version Brian D. James Jeffrey A. Kalinoski...

  16. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation for Direct H 2 PEM Fuel Cell Systems for Automotive Applications: 2010 Update September 30, 2010 Prepared by: Brian D. James, Jeffrey A. Kalinoski...

  17. mMass Production Cost Estimation for Direct H2 PEM Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation for Direct H 2 PEM Fuel Cell Systems for Automotive Applications: 2009 Update January 1, 2010 Prepared by: Brian D. James, Jeffrey A. Kalinoski &...

  18. Cost Quality Management Assessment for the Idaho Operations Office. Final report

    SciTech Connect (OSTI)

    NONE

    1995-06-01T23:59:59.000Z

    The Office of Engineering and Cost Management (EM-24) conducted a Cost Quality Management Assessment of EM-30 and EM-40 activities at the Idaho National Engineering Laboratory on Feb. 3--19, 1992 (Round I). The CQMA team assessed the cost and cost-related management activities at INEL. The Round II CQMA, conducted at INEL Sept. 19--29, 1994, reviewed EM-30, EM-40, EM-50, and EM-60 cost and cost-related management practices against performance objectives and criteria. Round II did not address indirect cost analysis. INEL has made measurable progress since Round I.

  19. Cost Estimation Package - DOE Directives, Delegations, and Requirement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    components (or elements) of the cost estimation package and their documentation. g4301-1chp2.pdf -- PDF Document, 10 KB Writer: John Makepeace Subjects: ID: DOE G 430.1-1 Chp 2...

  20. Examples of Cost Estimation Packages - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1997 CRD: No DNFSB: No Related History Exemptions Standards Related to: DOE G 430.1-1 Chp 9, Operating Costs DOE G 430.1-1 Chp 19, Data Collection and Normalization for the...

  1. Cost Estimating Guide, Table of Contents - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1997 CRD: No DNFSB: No Related History Exemptions Standards Related to: DOE G 430.1-1 Chp 9, Operating Costs DOE G 430.1-1 Chp 19, Data Collection and Normalization for the...

  2. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Direct H2 PEM Fuel Cell Systems for Automotive Application: 2009 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Application: 2009...

  3. A cost-effective mechanism for Cloud data reliability management based on proactive replica checking

    E-Print Network [OSTI]

    Yang, Yun

    A cost-effective mechanism for Cloud data reliability management based on proactive replica for managing the data reliability would incur huge storage cost. To address this issue, in this paper we present a novel cost-effective data reliability management mechanism named PRCR, which proactively checks

  4. ORNL: Low-Cost Direct Bonded Aluminum (DBA) Substrates (Agreement...

    Broader source: Energy.gov (indexed) [DOE]

    ORNL) 4 Managed by UT-Battelle for the Department of Energy FY13 - 1: Complete optimization of fabrication processing parameters for DBA substrates with alumina (Al 2 O 3 )...

  5. Enforcement Project Management Handbook. Directive (Final)

    SciTech Connect (OSTI)

    Not Available

    1989-07-01T23:59:59.000Z

    The publication is a basic reference and training manual to assist EPA Superfund field personnel (Remedial Project Managers and On Scene Coordinators) in planning, negotiating, and managing potentially responsible party (PRP) searches and PRP-lead actions at Superfund sites. It provides an overview of each phase of the Superfund enforcement process and discusses specific roles and responsibilities of the RPM/OSC in the process.

  6. Challenging the Cost Effectiveness of Medi-Cal Managed Care

    E-Print Network [OSTI]

    Riner, R. Myles

    2009-01-01T23:59:59.000Z

    paper presents data that challenge the cost effectiveness ofcredible data on eligibility, enrollment, networks, cost,without such data they cannot be a cost- effective partner

  7. THE EFFECT OF INCREASING TRANSPORTATION COST ON FOREIGN DIRECT INVESTMENT.

    E-Print Network [OSTI]

    Gressler, Kimberly

    2009-06-09T23:59:59.000Z

    broader dataset which has already been developed will be expanded to include the dramatic changes in oil prices pre Y2K and post Y2K. It was hypothesized that results will reflect that the cost of transportation will drive investment closer, rather...-based. Using this information as a guide, assessment of location choice can be made. Investors find a location to benefit market factors or efficiency factors, and in light of this, transportation has developed and so has globalization. Globalization has...

  8. Cost Estimating Guide - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power Administration would likeConstitution AndControllingCoolCorrective Action1, Cost Estimating

  9. Los Alamos Waste Management Cost Estimation Model; Final report: Documentation of waste management process, development of Cost Estimation Model, and model reference manual

    SciTech Connect (OSTI)

    Matysiak, L.M.; Burns, M.L.

    1994-03-01T23:59:59.000Z

    This final report completes the Los Alamos Waste Management Cost Estimation Project, and includes the documentation of the waste management processes at Los Alamos National Laboratory (LANL) for hazardous, mixed, low-level radioactive solid and transuranic waste, development of the cost estimation model and a user reference manual. The ultimate goal of this effort was to develop an estimate of the life cycle costs for the aforementioned waste types. The Cost Estimation Model is a tool that can be used to calculate the costs of waste management at LANL for the aforementioned waste types, under several different scenarios. Each waste category at LANL is managed in a separate fashion, according to Department of Energy requirements and state and federal regulations. The cost of the waste management process for each waste category has not previously been well documented. In particular, the costs associated with the handling, treatment and storage of the waste have not been well understood. It is anticipated that greater knowledge of these costs will encourage waste generators at the Laboratory to apply waste minimization techniques to current operations. Expected benefits of waste minimization are a reduction in waste volume, decrease in liability and lower waste management costs.

  10. Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of No53197E T A *Dingell_to_Bodman_0206.pdfDirect

  11. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Applications: 2010 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2010 Update This report is the fourth annual update of a...

  12. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    estimates for material and manufacturing costs of complete 80 kWnet direct-hydrogen proton exchange membrane fuel cell systems suitable for powering light-duty automobiles. Mass...

  13. Manufacturing Cost Analysis of 10 kW and 25 kW Direct Hydrogen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis of 10 kW and 25 kW Direct Hydrogen Polymer Electrolyte Membrane (PEM) Fuel Cell for Material Handling Applications Manufacturing Cost Analysis of 10 kW and 25 kW...

  14. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mass Production Cost Estimation for Direct H 2 PEM Fuel Cell Systems for Automotive Applications: 2008 Update March 26, 2009 v.30.2021.052209 Prepared by: Brian D. James & Jeffrey...

  15. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for

    E-Print Network [OSTI]

    Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications for transportation. Fuel cell systems will have to be cost-competitive with conventional and advanced vehicle cell vehicles have the potential to eliminate the need for oil in the transportation sector. Fuel cell

  16. Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for

    E-Print Network [OSTI]

    1 Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation (2012), annually updated costs analyses will be conducted for PEM fuel cell passenger buses as well to eliminate the need for oil in the transportation sector. Fuel cell vehicles can operate on hydrogen, which

  17. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for

    E-Print Network [OSTI]

    Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications vehicles offer an environmentally clean and energy-secure transportation pathway. Fuel cell systems number of vehicles it represents, DOE has established detailed cost targets for automotive fuel cell

  18. Cost effective waste management through composting in Africa

    SciTech Connect (OSTI)

    Couth, R. [CRECHE, Centre for Environmental, Coastal and Hydrological Engineering, Civil Engineering Programme, School of Engineering, University of KwaZulu-Natal, Durban 4041 (South Africa); Trois, C., E-mail: troisc@ukzn.ac.za [CRECHE, Centre for Environmental, Coastal and Hydrological Engineering, Civil Engineering Programme, School of Engineering, University of KwaZulu-Natal, Durban 4041 (South Africa)

    2012-12-15T23:59:59.000Z

    Highlights: Black-Right-Pointing-Pointer The financial/social/institutional sustainability of waste management in Africa is analysed. Black-Right-Pointing-Pointer This note is a compendium of a study on the potential for GHG control via improved zero waste in Africa. Black-Right-Pointing-Pointer This study provides the framework for Local Authorities for realizing sustained GHG reductions. - Abstract: Greenhouse gas (GHG) emissions per person from urban waste management activities are greater in sub-Saharan African countries than in other developing countries, and are increasing as the population becomes more urbanised. Waste from urban areas across Africa is essentially dumped on the ground and there is little control over the resulting gas emissions. The clean development mechanism (CDM), from the 1997 Kyoto Protocol has been the vehicle to initiate projects to control GHG emissions in Africa. However, very few of these projects have been implemented and properly registered. A much more efficient and cost effective way to control GHG emissions from waste is to stabilise the waste via composting and to use the composted material as a soil improver/organic fertiliser or as a component of growing media. Compost can be produced by open windrow or in-vessel composting plants. This paper shows that passively aerated open windrows constitute an appropriate low-cost option for African countries. However, to provide an usable compost material it is recommended that waste is processed through a materials recovery facility (MRF) before being composted. The paper demonstrates that material and biological treatment (MBT) are viable in Africa where they are funded, e.g. CDM. However, they are unlikely to be instigated unless there is a replacement to the Kyoto Protocol, which ceases for Registration in December 2012.

  19. Performance Directed Energy Management for Main Memory and Disks #

    E-Print Network [OSTI]

    Zhou, Yuanyuan

    in the design of computing systems. For battery­operated mobile devices, energy consumption directly affects]. The storage hierarchy, which includes memory and disks, is a major energy consumer in computer systemsPerformance Directed Energy Management for Main Memory and Disks # Xiaodong Li, Zhenmin Li, Francis

  20. Improved supplier selection and cost management for globalized automotive production

    E-Print Network [OSTI]

    Franken, Joseph P., II (Joseph Philip)

    2012-01-01T23:59:59.000Z

    For many manufacturing and automotive companies, traditional sourcing decisions rely on total landed cost models to determine the cheapest supplier. Total landed cost models calculate the cost to purchase a part plus all ...

  1. Direct costing

    E-Print Network [OSTI]

    Browning, Donald Bullock

    1960-01-01T23:59:59.000Z

    segregation of expenses and sahib seoondarilg a method of inventorjI valuation. Sy this ayyroaoh& full attention on ths yrofit auC loss statement anC supylementarg x'eyorts I Xu answering the Eglestion "What is Cirset oosttugV", it is helpful to oossi... ~aoturing overhead) is exoluded. k proper evaluation of this argument should inolude eonsi@ex ation of the fast that direst seating does not yroyose to fix inventory values at an amount equal, to what inventories cue worth. Othex methods of inventory vaLuation...

  2. Commissioning: A Highly Cost-Effective Building Energy Management Strategy

    E-Print Network [OSTI]

    Mills, Evan

    2012-01-01T23:59:59.000Z

    Commissioning: A Highly Cost-Effective Building Energypractice of building commissioning is a particularly potentefficiency. Although commissioning has earned increased

  3. The New Oncology: Cost-effectiveness and Matchless Impactof PET-CT in Cancer Management CME

    E-Print Network [OSTI]

    Jadvar, Hossein

    The New Oncology: Cost-effectiveness and Matchless Impactof PET-CT in Cancer Management CME Author in integrating cost-effective FDG-PET and PET-CT fusion techniques into their clinical armamentarium to refine the clinical impact and cost-effectiveness of advanced imaging studies such as FDG-PET scanning and PET-CT

  4. Benefits and costs of load management: a technical assistance and resource material handbook

    SciTech Connect (OSTI)

    Mueller, Ronald; Ackerman, Gary; Lau, Ronald; Patmore, James; Ma, Fred; Sechan, Neil; Schoor, Alan; Simon, Lois; Bleiweis, Bruce; Lloyd, Kevin

    1980-06-01T23:59:59.000Z

    This handbook will assist state regulatory authorities and electric utilities in complying with the Load Management Standard of the Public Utility Regulatory Policies Act of 1978. The handbook has two major sections. The first discusses load-management techniques in terms of equipment, customer applications, combinations of techniques, etc. Key steps for evaluating the costs and benefits of load management options also are presented. These steps are intended to sequentially eliminate ineffective load-management options as the cost-benefit calculation becomes more detailed. The second section includes up-to-date information on available load-management technologies, models for utility costing, load-management data transfer, prescreening of load-management options, and the load-management literature.

  5. Using Key Performance Indicators to Manage Energy Costs 

    E-Print Network [OSTI]

    Van Gorp, J. C.

    2005-01-01T23:59:59.000Z

    Modern management systems rely heavily on information technology to set goals, track performance and communicate results. Energy management approaches (such as those offered by the US Department of Energy and Natural Resources Canada...

  6. Facilitating Sound, Cost-Effective Federal Energy Management (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-12-01T23:59:59.000Z

    This fact sheet is an overview of the U.S. Department of Energy's Federal Energy Management Program (FEMP).

  7. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2009 Update

    Fuel Cell Technologies Publication and Product Library (EERE)

    This report is the third annual update of a comprehensive automotive fuel cell cost analysis. It contains estimates for material and manufacturing cost of complete 80 kWnet direct hydrogen proton exch

  8. Mass Production Cost Estimation For Direct H2 PEM Fuel Cell Systesm for Automotive Applications: 2010 Update

    Fuel Cell Technologies Publication and Product Library (EERE)

    This report is the fourth annual update of a comprehensive automotive fuel cell cost analysis. It contains estimates for material and manufacturing costs of complete 80 kWnet direct?hydrogen proton ex

  9. Cost-Effective Silicon Wafers for Solar Cells: Direct Wafer Enabling Terawatt Photovoltaics

    SciTech Connect (OSTI)

    None

    2010-01-15T23:59:59.000Z

    Broad Funding Opportunity Announcement Project: 1366 is developing a process to reduce the cost of solar electricity by up to 50% by 2020—from $0.15 per kilowatt hour to less than $0.07. 1366’s process avoids the costly step of slicing a large block of silicon crystal into wafers, which turns half the silicon to dust. Instead, the company is producing thin wafers directly from molten silicon at industry-standard sizes, and with efficiencies that compare favorably with today’s state-of-the-art technologies. 1366’s wafers could directly replace wafers currently on the market, so there would be no interruptions to the delivery of these products to market. As a result of 1366’s technology, the cost of silicon wafers could be reduced by 80%.

  10. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for

    E-Print Network [OSTI]

    Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2010 Update fuel cell vehicles have the potential to eliminate the need for oil in the transportation sector. Fuel, and biomass. Thus, fuel cell vehicles offer an environmentally clean and energysecure transportation pathway

  11. Comparison of Life Cycle Costs for LLRW Management in Texas

    SciTech Connect (OSTI)

    Baird, R. D.; Rogers, B. C.; Chau, N.; Kerr, Thomas A

    1999-08-01T23:59:59.000Z

    This report documents a comparison of life-cycle costs of an assured isolation facility in Texas versus the life-cycle costs for a traditional belowground low-level radioactive waste disposal facility designed for the proposed site near Sierra Blanca, Texas.

  12. A Low Cost Energy Management Program at Engelhard Industries Division 

    E-Print Network [OSTI]

    Brown, T. S.; Michalek, R.; Reiter, S.

    1982-01-01T23:59:59.000Z

    in technology related to precious metals and nonmetallic minerals. It manufactures high-performance chemical and precious metals products, including catalysts for the petroleum and automotive industries. Engelhard's energy costs have risen dramatically over...

  13. A Low Cost Energy Management Program at Engelhard Industries Division

    E-Print Network [OSTI]

    Brown, T. S.; Michalek, R.; Reiter, S.

    1982-01-01T23:59:59.000Z

    in technology related to precious metals and nonmetallic minerals. It manufactures high-performance chemical and precious metals products, including catalysts for the petroleum and automotive industries. Engelhard's energy costs have risen dramatically over...

  14. Life-cycle costs for the Department of Energy Waste Management Programmatic Environmental Impact Statement

    SciTech Connect (OSTI)

    Sherick, M.J.; Shropshire, D.E.; Hsu, K.M.

    1996-09-01T23:59:59.000Z

    The US Department of Energy (DOE) Office of Environmental Management has produced a Programmatic Environmental Impact Statement (PEIS) in order to assess the potential consequences resulting from a cross section of possible waste management strategies for the DOE complex. The PEIS has been prepared in compliance with the NEPA and includes evaluations of a variety of alternatives. The analysis performed for the PEIS included the development of life-cycle cost estimates for the different waste management alternatives being considered. These cost estimates were used in the PEIS to support the identification and evaluation of economic impacts. Information developed during the preparation of the life-cycle cost estimates was also used to support risk and socioeconomic analyses performed for each of the alternatives. This technical report provides an overview of the methodology used to develop the life-cycle cost estimates for the PEIS alternatives. The methodology that was applied made use of the Waste Management Facility Cost Information Reports, which provided a consistent approach and estimating basis for the PEIS cost evaluations. By maintaining consistency throughout the cost analyses, life-cycle costs of the various alternatives can be compared and evaluated on a relative basis. This technical report also includes the life-cycle cost estimate results for each of the PEIS alternatives evaluated. Summary graphs showing the results for each waste type are provided and tables showing different breakdowns of the cost estimates are provided. Appendix E contains PEIS cost information that was developed using an approach different than the standard methodology described in this report. Specifically, costs for high-level waste are found in this section, as well as supplemental costs for additional low-level waste and hazardous waste alternatives.

  15. Proactive Temperature Balancing for Low Cost Thermal Management in MPSoCs

    E-Print Network [OSTI]

    Simunic, Tajana

    Proactive Temperature Balancing for Low Cost Thermal Management in MPSoCs Ayse Kivilcim Coskun-die temperature variations at low performance cost is a very significant challenge for multiprocessor system the future temperature and adjusts the job allocation on the MPSoC to minimize the impact of thermal hot

  16. The Texas Cattle Feeding Industry - Operations, Management, and Costs.

    E-Print Network [OSTI]

    Dietrich, R.A.; Thomas, P.J.; Farris, D.E.

    1985-01-01T23:59:59.000Z

    per pound of gain. The largest decrease in annual fixed costs per pound of gain occurred as feedlot size increased from less than 1,0.0.0. head capacity to 4,0.0.0. head capacity. Results revealed generally more variability in costs among smaller... almost 1,0.50. lb while heifers averaged about 865 lb. Almost 70.% of the fed steers marketed from Texas feedlots graded U.S. Choice or higher compared to 50% for fed heifers. Fed cattle marketed from Panhandle Plains feedlots were predominantly U...

  17. Complexity cost quantification and modeling for strategic portfolio management

    E-Print Network [OSTI]

    Ma, Jan, S.M. Massachusetts Institute of Technology

    2014-01-01T23:59:59.000Z

    This project explores portfolio management and planning through effectively reducing complexity within operations. We apply this to a major healthcare company (referred to as Company X). The anticipated launch of new ...

  18. Summary of the cost analysis report for the long-term management of depleted uranium hexafluoride

    SciTech Connect (OSTI)

    Dubrin, J.W.; Rahm-Crites, L.

    1997-09-01T23:59:59.000Z

    This report is a summary of the Cost Analysis Report which provides comparative cost data for the management strategy alternatives. The PEIS and the Cost Analysis Report will help DOE select a management strategy. The Record of Decision, expected in 1998, will complete the first part of the Depleted Uranium Hexafluoride Management Program. The second part of the Program will look at specific sites and technologies for carrying out the selected strategy. The Cost Analysis Report estimates the primary capital and operating costs for the different alternatives. It reflects the costs of technology development construction of facilities, operation, and decontamination and decommissioning. It also includes potential revenues from the sale of by-products such as anhydrous hydrogen fluoride (ABF). These estimates are based on early designs. They are intended to help in comparing alternatives, rather than to indicate absolute costs for project budgets or bidding purposes. More detailed estimates and specific funding sources will be considered in part two of the Depleted Uranium Hexafluoride Management Program.

  19. Using Key Performance Indicators to Manage Energy Costs

    E-Print Network [OSTI]

    Van Gorp, J. C.

    2005-01-01T23:59:59.000Z

    -effective to collect much more data than ever before, many energy managers find themselves drowning in the volume of data generated. Business information systems faced a similar challenge a decade ago, and it is now common practice to use Key Performance Indicators...

  20. Rheology and stability kinetics of bare silicon nanoparticle inks for low-cost direct printing

    SciTech Connect (OSTI)

    More, Priyesh V.; Jeong, Sunho; Seo, Yeong-Hui; Ryu, Beyong-Hwan; Choi, Youngmin [Advanced Materials Division, Korea Research Institute of Chemical Technology 141 Gajeong-ro, Yuseong-gu, Daejeon 305-600 (Korea, Republic of); Kim, Seong Jip [Advanced Materials Division, Korea Research Institute of Chemical Technology 141 Gajeong-ro, Yuseong-gu, Daejeon 305-600 Korea and Department of Materials Science and Engineering, Korea University 5-1 Anam-Dong, Seongbuk-gu, Seoul 136-701 (Korea, Republic of); Nahm, Sahn [Department of Materials Science and Engineering, Korea University 5-1 Anam-Dong, Seongbuk-gu, Seoul 136-701 (Korea, Republic of)

    2013-12-16T23:59:59.000Z

    Highly dispersed and stable silicon nanoparticles ink is formulated for its application in direct printing or printable electronics. These dispersions are prepared from free-standing silicon nanoparticles which are not capped with any organic ligand, making it suitable for electronic applications. Silicon nanoparticles dispersions are prepared by suspending the nanoparticles in benzonitrile or ethanol by using polypropylene glycol (PPG) as a binder. All the samples show typical shear thinning behavior while the dispersion samples show low viscosities signifying good quality dispersion. Such thinning behavior favors in fabrication of dense films with spin-coating or patterns with drop casting. The dispersion stability is monitored by turbiscan measurements showing good stability for one week. A low-cost direct printing method for dispersion samples is also demonstrated to obtain micro-sized patterns. Low electrical resistivity of resulting patterns, adjustable viscosity and good stability makes these silicon nanoparticles dispersions highly applicable for direct printing process.

  1. Material and energy recovery in integrated waste management systems: A life-cycle costing approach

    SciTech Connect (OSTI)

    Massarutto, Antonio [University of Udine, Udine (Italy); IEFE, Bocconi University, Milan (Italy); Carli, Alessandro de, E-mail: alessandro.decarli@unibocconi.it [IEFE, Bocconi University, Milan (Italy); Graffi, Matteo [University of Udine, Udine (Italy); IEFE, Bocconi University, Milan (Italy)

    2011-09-15T23:59:59.000Z

    Highlights: > The study aims at assessing economic performance of alternative scenarios of MSW. > The approach is the life-cycle costing (LCC). > Waste technologies must be considered as complementary into an integrated strategy. - Abstract: A critical assumption of studies assessing comparatively waste management options concerns the constant average cost for selective collection regardless the source separation level (SSL) reached, and the neglect of the mass constraint. The present study compares alternative waste management scenarios through the development of a desktop model that tries to remove the above assumption. Several alternative scenarios based on different combinations of energy and materials recovery are applied to two imaginary areas modelled in order to represent a typical Northern Italian setting. External costs and benefits implied by scenarios are also considered. Scenarios are compared on the base of the full cost for treating the total waste generated in the area. The model investigates the factors that influence the relative convenience of alternative scenarios.

  2. Financial sustainability in municipal solid waste managementCosts and revenues in Bahir Dar, Ethiopia

    SciTech Connect (OSTI)

    Lohri, Christian Riuji, E-mail: christian.lohri@eawag.ch; Camenzind, Ephraim Joseph, E-mail: ephraimcamenzind@hotmail.com; Zurbrügg, Christian, E-mail: christian.zurbruegg@eawag.ch

    2014-02-15T23:59:59.000Z

    Highlights: • Cost-revenue analysis over 2 years revealed insufficient cost-recovery. • Expenses for motorized secondary collection increased by 82% over two years. • Low fee collection rate and reliance on only one revenue stream are problematic. • Different options for cost reduction and enhanced revenue streams are recommended. • Good public–private alliance is crucial to plan and implement improvement measures. - Abstract: Providing good solid waste management (SWM) services while also ensuring financial sustainability of the system continues to be a major challenge in cities of developing countries. Bahir Dar in northwestern Ethiopia outsourced municipal waste services to a private waste company in 2008. While this institutional change has led to substantial improvement in the cleanliness of the city, its financial sustainability remains unclear. Is the private company able to generate sufficient revenues from their activities to offset the costs and generate some profit? This paper presents a cost-revenue analysis, based on data from July 2009 to June 2011. The analysis reveals that overall costs in Bahir Dar’s SWM system increased significantly during this period, mainly due to rising costs related to waste transportation. On the other hand, there is only one major revenue stream in place: the waste collection fee from households, commercial enterprises and institutions. As the efficiency of fee collection from households is only around 50%, the total amount of revenues are not sufficient to cover the running costs. This results in a substantial yearly deficit. The results of the research therefore show that a more detailed cost structure and cost-revenue analysis of this waste management service is important with appropriate measures, either by the privates sector itself or with the support of the local authorities, in order to enhance cost efficiency and balance the cost-revenues towards cost recovery. Delays in mitigating the evident financial deficit could else endanger the public-private partnership (PPP) and lead to failure of this setup in the medium to long term, thus also endangering the now existing improved and currently reliable service. We present four options on how financial sustainability of the SWM system in Bahir Dar might be enhanced: (i) improved fee collection efficiency by linking the fees of solid waste collection to water supply; (ii) increasing the value chain by sales of organic waste recycling products; (iii) diversifying revenue streams and financing mechanisms (polluter-pays-, cross-subsidy- and business-principles); and (iv) cost reduction and improved cost-effectiveness. We argue that in a PPP setup such as in Bahir Dar, a strong alliance between the municipality and private enterprise is important so that appropriate solutions for improved financial sustainability of a SWM system can be sought and implemented.

  3. Enterprise Risk Management (ERM) Model - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Enterprise Risk Management (ERM) Model by Website Administrator The Enterprise Risk Management Model is a new standardized framework that the Department will be using to develop,...

  4. Managing the Cost, Energy Consumption, and Carbon Footprint of Internet Services

    E-Print Network [OSTI]

    Martonosi, Margaret

    Managing the Cost, Energy Consumption, and Carbon Footprint of Internet Services Kien Le , Ozlem electricity consumptions translate into large carbon footprints, since most of the electricity in the US such as government imposed Kyoto- style carbon limits. Extensive simulations and real experiments show that our

  5. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program

    SciTech Connect (OSTI)

    NONE

    1989-05-01T23:59:59.000Z

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy`s (DOE) Civilian Radioactive Waste Management Program is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 -- a fee levied on electricity generated in commercial nuclear power plants -- is sufficient to cover the cost of the program. This report provides cost estimates for the sixth annual evaluation of the adequacy of the fee and is consistent with the program strategy and plans contained in the DOE`s Draft 1988 Mission Plan Amendment. The total-system cost for the system with a repository at Yucca Mountain, Nevada, a facility for monitored retrievable storage (MRS), and a transportation system is estimated at $24 billion (expressed in constant 1988 dollars). In the event that a second repository is required and is authorized by the Congress, the total-system cost is estimated at $31 to $33 billion, depending on the quantity of spent fuel to be disposed of. The $7 billion cost savings for the single-repository system in comparison with the two-repository system is due to the elimination of $3 billion for second-repository development and $7 billion for the second-repository facility. These savings are offset by $2 billion in additional costs at the first repository and $1 billion in combined higher costs for the MRS facility and transportation. 55 refs., 2 figs., 24 tabs.

  6. Office of Civilian Radioactive Waste Management Program Cost and Schedule Baseline; Revision 3

    SciTech Connect (OSTI)

    NONE

    1992-09-01T23:59:59.000Z

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive (Level 0) and Program (Level 1) Change Control Boards (CCBS) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD), the Waste Management System Requirements (WMSR), and the Physical System Requirements documents provide the technical basis for the PCSB. Changes to the PCSB will be approved by the Pregrain Change Control Board (PCCB)In addition to the PCCB, the Energy System Acquisition Advisory Board Baseline CCB (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project and the Monitored Retrievable Storage (MRS) Project.

  7. OS-Directed Power Management for Mobile Electronic Systems Qinru Qiu, Qing Wu and Massoud Pedram

    E-Print Network [OSTI]

    Pedram, Massoud

    OS-Directed Power Management for Mobile Electronic Systems Qinru Qiu, Qing Wu and Massoud Pedram management. We model a power-managed system using a continuous-time Markov decision process and solve for the optimal power management policy using a mathematical programming technique. Next we extend the model

  8. Performance and cost models for the direct sulfur recovery process. Task 1 Topical report, Volume 3

    SciTech Connect (OSTI)

    Frey, H.C. [North Carolina State Univ., Raleigh, NC (United States); Williams, R.B. [Carneigie Mellon Univ., Pittsburgh, PA (United States)

    1995-09-01T23:59:59.000Z

    The purpose of this project is to develop performance and cost models of the Direct Sulfur Recovery Process (DSRP). The DSRP is an emerging technology for sulfur recovery from advanced power generation technologies such as Integrated Gasification Combined Cycle (IGCC) systems. In IGCC systems, sulfur present in the coal is captured by gas cleanup technologies to avoid creating emissions of sulfur dioxide to the atmosphere. The sulfur that is separated from the coal gas stream must be collected. Leading options for dealing with the sulfur include byproduct recovery as either sulfur or sulfuric acid. Sulfur is a preferred byproduct, because it is easier to handle and therefore does not depend as strongly upon the location of potential customers as is the case for sulfuric acid. This report describes the need for new sulfur recovery technologies.

  9. COMPLETELY DC-FREE DIRECT SEQUENCE SPECTRUM SPREADING SCHEME FOR LOW POWER, LOW COST, DIRECT CONVERSION TRANSCEIVER

    E-Print Network [OSTI]

    Lee, Thomas H.

    call the offset code spreading scheme. By employing the scheme, we can implement a direct- conversion- level design. The direct conversion receiver architecture combined with D-BPSK (differential, there are some design problems. In a direct conversion receiver, DC offset due to carrier leakage and 1/f mixer

  10. Cost estimates for near-term depolyment of advanced traffic management systems. Final report

    SciTech Connect (OSTI)

    Stevens, S.S.; Chin, S.M.

    1993-02-15T23:59:59.000Z

    The objective of this study is to provide cost est engineering, design, installation, operation and maintenance of Advanced Traffic Management Systems (ATMS) in the largest 75 metropolitan areas in the United States. This report gives estimates for deployment costs for ATMS in the next five years, subject to the qualifications and caveats set out in following paragraphs. The report considers infrastructure components required to realize fully a functional ATMS over each of two highway networks (as discussed in the Section describing our general assumptions) under each of the four architectures identified in the MITRE Intelligent Vehicle Highway Systems (IVHS) Architecture studies. The architectures are summarized in this report in Table 2. Estimates are given for eight combinations of highway networks and architectures. We estimate that it will cost between $8.5 Billion (minimal network) and $26 Billion (augmented network) to proceed immediately with deployment of ATMS in the largest 75 metropolitan areas. Costs are given in 1992 dollars, and are not adjusted for future inflation. Our estimates are based partially on completed project costs, which have been adjusted to 1992 dollars. We assume that a particular architecture will be chosen; projected costs are broken by architecture.

  11. Energy Management System Lowers U.S. Navy Energy Costs Through PV System Interconnection (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-04-01T23:59:59.000Z

    To meet the U.S. Navy's energy goals, the National Renewable Energy Laboratory (NREL) and the Naval Facilities Engineering Command (NAVFAC) spent two years collaborating on demonstrations that tested market-ready energy efficiency measures, renewable energy generation, and energy systems integration. One such technology - an energy management system - was identified as a promising method for reducing energy use and costs, and can contribute to increasing energy security.

  12. Systematic methodology for estimating direct capital costs for blanket tritium processing systems

    SciTech Connect (OSTI)

    Finn, P.A.

    1985-01-01T23:59:59.000Z

    This paper describes the methodology developed for estimating the relative capital costs of blanket processing systems. The capital costs of the nine blanket concepts selected in the Blanket Comparison and Selection Study are presented and compared.

  13. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    technology * 2015 projected technology 2 Determine costs for these 3 tech level Fuel Cell System Battery System Storage 2. Determine costs for these 3 tech level systems at 5...

  14. Life-cycle costing manual for the federal energy management programs

    SciTech Connect (OSTI)

    Ruegg, R.T.

    1982-05-01T23:59:59.000Z

    This manual is a guide to understanding the life-cycle costing method and an aid to calculating the measures required for evaluating energy conservation and renewable energy investments in all Federal buildings. It expands upon the life-cycle costing criteria contained in the Program Rules of the Federal Energy Management Program (Subpart A of Part 436, Title 10, U.S. Code of Federal Regulations) and is consistent with those criteria. Its purpose is to facilitate the implementation of the Program Rules by explaining the life-cycle costing method, defining the measures, describing the assumptions and procedures to follow in performing evaluations, and giving examples. It provides worksheets, a computer program, and instructions for calculating the required measurements. The life-cycle costing method and evaluation procedures set forth in the Federal Energy Management Program Rules and described in greater detail in this guide are to be followed by all Federal agenecies for all energy conservation and renewable energy projects undertaken in new and existing buildings and facilities owned or leased by the Federal government, unless specifically exempted. The establishment of the methods and procedures and their use by Federal agencies to evaluate energy conservation and solar energy investments are required by Section 381(a)(2) of the Energy Policy and Conservation Act, as amended, 42 U.S.C. 6361(a)(2); by Section 10 of Presidential Executive Order 11912, amended; and by Title V of the National Energy Conservation Policy Act, 92 Stat. 3275.

  15. Groundwater Management and the Cost of Reduced Surface Water Deliveries to Urban Areas: The Case of the Central and West Coast Basins of Southern California

    E-Print Network [OSTI]

    Sunding, David L.; Hamilton, Stephen F; Ajami, Newsha K

    2009-01-01T23:59:59.000Z

    Optimal Management of Groundwater over Space and Time. ”Optimal Control in Groundwater Pumping,” Water ResourcesYear ???? Paper ???? Groundwater Management and the Cost of

  16. Direct and Indirect Impacts of Weed Management Practices on Soil Quality

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    : although effective weed management and enhancement of soil quality are necessary components of sustainable275 18 Direct and Indirect Impacts of Weed Management Practices on Soil Quality Richard G. Smith, crop yield, and agricultural sustainability (Kar- len et al., 2001), the impact that weed management

  17. SDN Management Layer: Design Requirements and Future Direction Yuefeng Wang Ibrahim Matta

    E-Print Network [OSTI]

    innovations. In this survey paper, by reviewing existing SDN management layers (platforms), we identifySDN Management Layer: Design Requirements and Future Direction Yuefeng Wang Ibrahim Matta Computer­006 Abstract---Computer networks are becoming more and more complex and difficult to manage. The research

  18. SDN Management Layer: Design Requirements and Future Direction Yuefeng Wang Ibrahim Matta

    E-Print Network [OSTI]

    innovations. In this survey paper, by reviewing existing SDN management layers (platforms), we identifySDN Management Layer: Design Requirements and Future Direction Yuefeng Wang Ibrahim Matta Computer-006 Abstract--Computer networks are becoming more and more complex and difficult to manage. The research

  19. Comparative Cost Analysis of Alternative Animal Tracing Strategies Directed Toward Foot and Mouth Disease Outbreaks in the Texas High Plains 

    E-Print Network [OSTI]

    Looney, John C.

    2010-07-14T23:59:59.000Z

    to Garner and Lack (1995) was used to carry out the research. Five health states were installed in the model including susceptible, latent, infected, immune, and depopulated. The economic model connected to the disease spread model was comprised of three... sections. The first dealt with the direct costs of depopulation, disinfection, and enforcing the quarantine zone. The second of the economic model used an input-output model to calculate the direct, indirect, and induced losses for California. The final...

  20. Estimating Methods - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    direct costs, and other estimating considerations are discussed in this chapter. g4301-1chp15.pdf -- PDF Document, 28 KB Writer: John Makepeace Subjects: Administration Management...

  1. Applications of life cycle assessment and cost analysis in health care waste management

    SciTech Connect (OSTI)

    Soares, Sebastiao Roberto, E-mail: soares@ens.ufsc.br [Department of Sanitary Engineering, Federal University of Santa Catarina, UFSC, Campus Universitario, Centro Tecnologico, Trindade, PO Box 476, Florianopolis, SC 88040-970 (Brazil); Finotti, Alexandra Rodrigues, E-mail: finotti@ens.ufsc.br [Department of Sanitary Engineering, Federal University of Santa Catarina, UFSC, Campus Universitario, Centro Tecnologico, Trindade, PO Box 476, Florianopolis, SC 88040-970 (Brazil); Prudencio da Silva, Vamilson, E-mail: vamilson@epagri.sc.gov.br [Department of Sanitary Engineering, Federal University of Santa Catarina, UFSC, Campus Universitario, Centro Tecnologico, Trindade, PO Box 476, Florianopolis, SC 88040-970 (Brazil); EPAGRI, Rod. Admar Gonzaga 1347, Itacorubi, Florianopolis, Santa Catarina 88034-901 (Brazil); Alvarenga, Rodrigo A.F., E-mail: alvarenga.raf@gmail.com [Department of Sanitary Engineering, Federal University of Santa Catarina, UFSC, Campus Universitario, Centro Tecnologico, Trindade, PO Box 476, Florianopolis, SC 88040-970 (Brazil); Ghent University, Department of Sustainable Organic Chemistry and Technology, Coupure Links 653/9000 Gent (Belgium)

    2013-01-15T23:59:59.000Z

    Highlights: Black-Right-Pointing-Pointer Three Health Care Waste (HCW) scenarios were assessed through environmental and cost analysis. Black-Right-Pointing-Pointer HCW treatment using microwave oven had the lowest environmental impacts and costs in comparison with autoclave and lime. Black-Right-Pointing-Pointer Lime had the worst environmental and economic results for HCW treatment, in comparison with autoclave and microwave. - Abstract: The establishment of rules to manage Health Care Waste (HCW) is a challenge for the public sector. Regulatory agencies must ensure the safety of waste management alternatives for two very different profiles of generators: (1) hospitals, which concentrate the production of HCW and (2) small establishments, such as clinics, pharmacies and other sources, that generate dispersed quantities of HCW and are scattered throughout the city. To assist in developing sector regulations for the small generators, we evaluated three management scenarios using decision-making tools. They consisted of a disinfection technique (microwave, autoclave and lime) followed by landfilling, where transportation was also included. The microwave, autoclave and lime techniques were tested at the laboratory to establish the operating parameters to ensure their efficiency in disinfection. Using a life cycle assessment (LCA) and cost analysis, the decision-making tools aimed to determine the technique with the best environmental performance. This consisted of evaluating the eco-efficiency of each scenario. Based on the life cycle assessment, microwaving had the lowest environmental impact (12.64 Pt) followed by autoclaving (48.46 Pt). The cost analyses indicated values of US$ 0.12 kg{sup -1} for the waste treated with microwaves, US$ 1.10 kg{sup -1} for the waste treated by the autoclave and US$ 1.53 kg{sup -1} for the waste treated with lime. The microwave disinfection presented the best eco-efficiency performance among those studied and provided a feasible alternative to subsidize the formulation of the policy for small generators of HCW.

  2. Development of a right-of-way cost estimation and cost estimate management process framework for highway projects

    E-Print Network [OSTI]

    Lucas, Matthew Allen

    2009-05-15T23:59:59.000Z

    .............................................................. 31 Results: ROW Estimation State of Practice ................................... 31 Critical Issues ....................................................................... 32 Overview of Current Practice... ............................................... 35 Analysis: Critical Review of Practices ........................................... 41 General ROW Cost Estimation Procedure ........................... 42 ROW Cost Estimation...

  3. Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543

    SciTech Connect (OSTI)

    Larsson, Arne; Lidar, Per [Studsvik Nuclear AB, SE-611 82 Nykoeping (Sweden)] [Studsvik Nuclear AB, SE-611 82 Nykoeping (Sweden); Bergh, Niklas; Hedin, Gunnar [Westinghouse Electric Sweden AB, Fredholmsgatan 2, SE-721 63, Vaesteraas (Sweden)] [Westinghouse Electric Sweden AB, Fredholmsgatan 2, SE-721 63, Vaesteraas (Sweden)

    2013-07-01T23:59:59.000Z

    Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

  4. ORA Faculty Orientation (Jan or Feb 2015) Proposals: budgets, cost share, statements of works, data management plans

    E-Print Network [OSTI]

    ORA Faculty Orientation (Jan or Feb 2015) Proposals: budgets, cost share, statements of works, data management plans Contracts & subcontracts: terms & conditions, IP, at-risk spending, equipment Awards: allowable costs, payroll forms, travel, billing, project setup & close http://inside.mines

  5. Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems...

    Broader source: Energy.gov (indexed) [DOE]

    This report is the seventh annual update of a comprehensive automotive fuel cell cost analysis conducted by Strategic Analysis under contract to the U.S. Department of Energy. In...

  6. Integrating cultural services and social value: Novel directions for ecosystem service management, valuation, and complexity

    E-Print Network [OSTI]

    Wallen, Kenneth E.

    2013-01-01T23:59:59.000Z

    Applied?Biodiversity?Sciences?Perspectives?Series? Advancing?Conservation?with?innovative?ideas?from?the?future?generation? ? Integrating?cultural?services?and?social?value:?Novel? directions?for?ecosystem?service?management,? valuation...?Kenneth?E.?Wallen?? ? ?? ? ? ? Suggested?citation:? Wallen,?K.?E.?(2013).?Integrating?cultural?services?and?social?value:?Novel? directions?for?ecosystem?service?management,?valuation,?and?complexity.? Applied?Biodiversity?Perspective?Series,?3(1)?1?13.? ? ? ? ? ABSTRACT...

  7. Performance Directed Energy Management for Main Memory and Disks

    E-Print Network [OSTI]

    Zhou, Yuanyuan

    grant, a gift from Intel Corp., and the National Science Foundation under Grant No. CCR-0096126, EIA in the design of computing systems. For battery-operated mobile devices, energy consumption directly affects]. The storage hierarchy, which includes memory and disks, is a major energy consumer in computer systems

  8. Risk information in support of cost estimates for the Baseline Environmental Management Report (BEMR). Section 1

    SciTech Connect (OSTI)

    Gelston, G.M.; Jarvis, M.F.; Warren, B.R. [Pacific Northwest Lab., Richland, WA (United States); Von Berg, R. [ICF Kaiser Engineers, Inc., Oakland, CA (United States)

    1995-06-01T23:59:59.000Z

    The Pacific Northwest Laboratory (PNL)(1) effort on the overall Baseline Environmental Management Report (BEMR) project consists of four installation-specific work components performed in succession. These components include (1) development of source terms, 92) collection of data and preparation of environmental settings reports, (3) calculation of unit risk factors, and (4) utilization of the unit risk factors in Automated Remedial Action Methodology (ARAM) for computation of target concentrations and cost estimates. This report documents work completed for the Nevada Test Site, Nevada, for components 2 and 3. The product of this phase of the BEMR project is the development of unit factors (i.e., unit transport factors, unit exposure factors, and unit risk factors). Thousands of these unit factors are gene rated and fill approximately one megabyte of computer information per installation. The final unit risk factors (URF) are transmitted electronically to BEMR-Cost task personnel as input to a computer program (ARAM). Abstracted files and exhibits of the URF information are included in this report. These visual formats are intended to provide a sample of the final task deliverable (the URF files) which can be easily read without a computer.

  9. Documenting cost and performance for environmental remediation projects: Department of Energy Office of Environmental Management

    SciTech Connect (OSTI)

    NONE

    1996-08-08T23:59:59.000Z

    The purpose of this DOE guide is to facilitate the use of consistent procedures to document cost and performance information for projects involving the remediation of media contaminated with hazardous and radioactive wastes. It provides remedial action project managers with a standardized set of data to document completed remediation projects. Standardized reporting of data will broaden the utility of the information, increase confidence in the effectiveness of future remedial technologies, and enhance the organization, storage and retrieval of relevant information for future cleanup projects. The foundation for this guide was laid down by the Federal Remediation Technologies Roundtable (FRTR) in their publication, Guide to Documenting Cost and Performance for Remediation Projects, EPA-542-B- 95-002. Member agencies of the FRTR include the US EPA, the US DOD, the US DOE, and the US DOI. All the member agencies are involved in site remediation projects and anticipate following the guidance provided in the above reference. Therefore, there is much to be gained for DOE to be consistent with the other member agencies as it will be easier to compare projects across different agencies and also to learn from the experiences of a wider spectrum of prior completed projects.

  10. US Spent (Used) Fuel Status, Management and Likely Directions- 12522

    SciTech Connect (OSTI)

    Jardine, Leslie J. [L. J. Jardine Services, Consultant, Dublin CA, 94568 (United States)

    2012-07-01T23:59:59.000Z

    As of 2010, the US has accumulated 65,200 MTU (42,300 MTU of PWR's; 23,000 MTU of BWR's) of spent (irradiated or used) fuel from 104 operating commercial nuclear power plants situated at 65 sites in 31 States and from previously shutdown commercial nuclear power plants. Further, the Department of Energy (DOE) has responsibility for an additional 2458 MTU of DOE-owned defense and non defense spent fuel from naval nuclear power reactors, various non-commercial test reactors and reactor demonstrations. The US has no centralized large spent fuel storage facility for either commercial spent fuel or DOE-owned spent fuel. The 65,200 MTU of US spent fuel is being safely stored by US utilities at numerous reactor sites in (wet) pools or (dry) metal or concrete casks. As of November 2010, the US had 63 'independent spent fuel storage installations' (or ISFSI's) licensed by the US Nuclear Regulatory Commission located at 57 sites in 33 states. Over 1400 casks loaded with spent fuel for dry storage are at these licensed ISFSI's; 47 sites are located at commercial reactor sites and 10 are located 'away' from a reactor (AFR's) site. DOE's small fraction of a 2458 MTU spent fuel inventory, which is not commercial spent fuel, is with the exception of 2 MTU, being stored at 4 sites in 4 States. The decades old US policy of a 'once through' fuel cycle with no recycle of spent fuel was set into a state of 'mass confusion or disruption' when the new US President Obama's administration started in early 2010 stopping the only US geologic disposal repository at the Yucca Mountain site in the State of Nevada from being developed and licensed. The practical result is that US nuclear power plant operators will have to continue to be responsible for managing and storing their own spent fuel for an indefinite period of time at many different sites in order to continue to generate electricity because there is no current US government plan, schedule or policy for taking possession of accumulated spent fuel from the utilities. There are technical solutions for continuing the safe storage of spent fuel for 100 years or more and these solutions will be implemented by the US utilities that need to keep their nuclear power plants operating while the unknown political events are played out to establish future US policy decisions that can remain in place long enough regarding accumulated spent fuel inventories to implement any new US spent fuel centralized storage or disposition policy by the US government. (author)

  11. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  12. A cost/benefit model for insertion of technological innovation into a total quality management program 

    E-Print Network [OSTI]

    Ratliff, William L

    1997-01-01T23:59:59.000Z

    justify quality improvement. The results of this study provide process-level engineers with a cost/benefit model template, which can be used to cost justify technological improvement based upon total quality costs....

  13. Minimization of Cost, Sediment Load, and Sensitivity to Climate Change in a Watershed Management Application

    E-Print Network [OSTI]

    Eppstein, Margaret J.

    caused by non-point source impacts from developed lands, structural Best Management Practices (BMPs management practice (BMP) plans for entire watersheds. Each of these alternative BMP configurations are non: multiobjective, differential evolution, robustness to uncertainty, stormwater management, best management

  14. Direct Thin Film Path to Low Cost, Large Area III-V Photovoltaics - Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign: PotentialFederal FinancialDirect KineticInnovation Portal

  15. 50 IEEE TRANSACTIONS ON SMART GRID, VOL. 3, NO. 1, MARCH 2012 Coordinated Energy Cost Management of Distributed

    E-Print Network [OSTI]

    of Electrical and Computer Engineering, Texas A&M University, College Station, USA (e-mail: lxie, and Wenyu Liu, Member, IEEE Abstract--This paper addresses the problem of electricity cost management on Internet services drastically increases in recent years, the electricity con- sumed by Internet data

  16. A cost/benefit model for insertion of technological innovation into a total quality management program

    E-Print Network [OSTI]

    Ratliff, William L

    1997-01-01T23:59:59.000Z

    for measuring quality improvement is the cost of quality. Traditionally, comprehensive quality cost reports have regularly been issued in a fixed format to identify opportunities for improvement and provide guidelines for improvement over time. However, current...

  17. Minimization of cost, sediment load, and sensitivity to climate change in a watershed management application

    E-Print Network [OSTI]

    Eppstein, Margaret J.

    : Multiobjective Differential evolution Robustness to uncertainty Stormwater management Best management practices-scale, multiobjective framework for generating a diverse family of stormwater best management practice (BMP) plans-point source impacts from developed lands, structural Best Management Practices (BMPs) such as detention ponds

  18. COORDINATING HUMAN AND MATERIAL RESOURCES Construction project management is the art of directing and coordinating human and material

    E-Print Network [OSTI]

    Simaan, Nabil

    COORDINATING HUMAN AND MATERIAL RESOURCES Construction project management is the art of directing and coordinating human and material resources throughout the life of a project by using modern management. Today's construction engineers and managers are faced with unprecedented challenges in planning

  19. Light-Weight, Low-Cost, Single-Phase, Liquid-Cooled Cold Plate (Presentation)

    SciTech Connect (OSTI)

    Narumanchi, S.

    2013-07-01T23:59:59.000Z

    This presentation, 'Light-Weight, Low-Cost, Single-Phase Liquid-Cooled Cold Plate,' directly addresses program goals of increased power density, specific power, and lower cost of power electronics components through improved thermal management.

  20. Directions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Directions Where We Are Directions The Bradbury Science Museum is located at 1350 Central Avenue Los Alamos, NM 87544 Los Alamos (elevation 7,355 feet) is perched high atop the...

  1. Energy-Smart Building Choices: How School Facilities Managers and Business Officials Are Reducing Operating Costs and Saving Money

    SciTech Connect (OSTI)

    Energy Smart Schools Team

    2001-08-06T23:59:59.000Z

    Most K-12 schools could save 25% of their energy costs by being smart about energy. Nationwide, the savings potential is $6 billion. While improving energy use in buildings and busses, schools are likely to create better places for teaching and learning, with better lighting, temperature control, acoustics, and air quality. This brochure, targeted to school facilities managers and business officials, describes how schools can become more energy efficient.

  2. Large-scale hybrid poplar production economics: 1995 Alexandria, Minnesota establishment cost and management

    SciTech Connect (OSTI)

    Downing, M. [Oak Ridge National Lab., TN (United States); Langseth, D. [WesMinn Resource Conservation and Development District, Alexandria, MN (United States); Stoffel, R. [Minnesota Dept. of Natural Resources, Alexandria, MN (United States); Kroll, T. [Minnesota Dept. of Natural Resources, St. Paul, MN (United States). Forestry Div.

    1996-12-31T23:59:59.000Z

    The purpose of this project was to track and monitor costs of planting, maintaining, and monitoring large scale commercial plantings of hybrid poplar in Minnesota. These costs assists potential growers and purchasers of this resource to determine the ways in which supply and demand may be secured through developing markets.

  3. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2008 Update

    Fuel Cell Technologies Publication and Product Library (EERE)

    This report estimates fuel cell system cost for systems produced in the years 2006, 2010, and 2015, and is the second annual update of a comprehensive automotive fuel cell cost analysis.

  4. Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update

    Fuel Cell Technologies Publication and Product Library (EERE)

    This report estimates fuel cell system cost for systems produced in the years 2007, 2010, and 2015, and is the first annual update of a comprehensive automotive fuel cell cost analysis.

  5. Changes in Flood Management along the Pajaro River: A Transition to Watershed Management Approaches and Lessons from the Water Framework Directive and Flood Directive

    E-Print Network [OSTI]

    Jagger, Stacie

    2009-01-01T23:59:59.000Z

    human actions causing environmental damage and the full-costand include the environmental damage and recovery costs (

  6. Energy Efficiency Improvement and Cost Saving Opportunities for the Glass Industry. An ENERGY STAR Guide for Energy and Plant Managers

    SciTech Connect (OSTI)

    Galitsky, Christina; Worrell, Ernst; Galitsky, Christina; Masanet, Eric; Graus, Wina

    2008-03-01T23:59:59.000Z

    The U.S. glass industry is comprised of four primary industry segments--flat glass, container glass, specialty glass, and fiberglass--which together consume $1.6 billion in energy annually. On average, energy costs in the U.S. glass industry account for around 14 percent of total glass production costs. Energy efficiency improvement is an important way to reduce these costs and to increase predictable earnings, especially in times of high energy price volatility. There is a variety of opportunities available at individual plants in the U.S. glass industry to reduce energy consumption in a cost-effective manner. This Energy Guide discusses energy efficiency practices and energy-efficient technologies that can be implemented at the component, process, system, and organizational levels. A discussion of the trends, structure, and energy consumption characteristics of the U.S. glass industry is provided along with a description of the major process steps in glass manufacturing. Expected savings in energy and energy-related costs are given for many energy efficiency measures, based on case study data from real-world applications in glass production facilities and related industries worldwide. Typical measure payback periods and references to further information in the technical literature are also provided, when available. The information in this Energy Guide is intended to help energy and plant managers in the U.S. glass industry reduce energy consumption in a cost-effective manner while maintaining the quality of products manufactured. Further research on the economics of the measures--as well on as their applicability to different production practices--is needed to assess potential implementation of selected technologies at individual plants.

  7. Municipal solid waste management: Identification and analysis of engineering indexes representing demand and costs generated in virtuous Italian communities

    SciTech Connect (OSTI)

    Gamberini, R., E-mail: rita.gamberini@unimore.it; Del Buono, D.; Lolli, F.; Rimini, B.

    2013-11-15T23:59:59.000Z

    Highlights: • Collection and analysis of real life data in the field of Municipal Solid Waste (MSW) generation and costs for management. • Study of 92 virtuous Italian communities. • Elaboration of trends of engineering indexes useful during design and evaluation of MSWM systems. - Abstract: The definition and utilisation of engineering indexes in the field of Municipal Solid Waste Management (MSWM) is an issue of interest for technicians and scientists, which is widely discussed in literature. Specifically, the availability of consolidated engineering indexes is useful when new waste collection services are designed, along with when their performance is evaluated after a warm-up period. However, most published works in the field of MSWM complete their study with an analysis of isolated case studies. Conversely, decision makers require tools for information collection and exchange in order to trace the trends of these engineering indexes in large experiments. In this paper, common engineering indexes are presented and their values analysed in virtuous Italian communities, with the aim of contributing to the creation of a useful database whose data could be used during experiments, by indicating examples of MSWM demand profiles and the costs required to manage them.

  8. Energy Efficiency Improvement and Cost Saving Opportunities for the Pharmaceutical Industry. An ENERGY STAR Guide for Energy and Plant Managers

    SciTech Connect (OSTI)

    Galitsky, Christina; Galitsky, Christina; Chang, Sheng-chieh; Worrell, Ernst; Masanet, Eric

    2008-03-01T23:59:59.000Z

    The U.S. pharmaceutical industry consumes almost $1 billion in energy annually. Energy efficiency improvement is an important way to reduce these costs and to increase predictable earnings, especially in times of high energy price volatility. There are a variety of opportunities available at individual plants in the U.S. pharmaceutical industry to reduce energy consumption in a cost-effective manner. This Energy Guide discusses energy efficiency practices and energy efficient technologies that can be implemented at the component, process, system, and organizational levels. A discussion of the trends, structure, and energy consumption characteristics of the U.S. pharmaceutical industry is provided along with a description of the major process steps in the pharmaceutical manufacturing process. Expected savings in energy and energy-related costs are given for many energy efficiency measures, based on case study data from real-world applications in pharmaceutical and related facilities worldwide. Typical measure payback periods and references to further information in the technical literature are also provided, when available. The information in this Energy Guide is intended to help energy and plant managers reduce energy consumption in a cost-effective manner while meeting regulatory requirements and maintaining the quality of products manufactured. At individual plants, further research on the economics of the measures?as well as their applicability to different production practices?is needed to assess potential implementation of selected technologies.

  9. Managing the cost of emissions for durable, carbon-containing products

    SciTech Connect (OSTI)

    Shirley, Kevin [Appalachian State University; Marland, Eric [Appalachian State University; Cantrell, Jenna [Appalachian State University; Marland, Gregg [ORNL

    2011-03-01T23:59:59.000Z

    We recognize that carbon-containing products do not decay and release CO2 to the atmosphere instantaneously, but release that carbon over extended periods of time. For an initial production of a stock of carbon-containing product, we can treat the release as a probability distribution covering the time over which that release occurs. The probability distribution that models the carbon release predicts the amount of carbon that is released as a function of time. The use of a probability distribution in accounting for the release of carbon to the atmosphere realizes a fundamental shift from the idea that all carbon-containing products contribute to a single pool that decays in proportion to the size of the stock. Viewing the release of carbon as a continuous probabilistic process introduces some theoretical opportunities not available in the former paradigm by taking advantage of other fields where the use of probability distributions has been prevalent for many decades. In particular, theories developed in the life insurance industry can guide the development of pricing and payment structures for dealing with the costs associated with the oxidation and release of carbon. These costs can arise from a number of proposed policies (cap and trade, carbon tax, social cost of carbon, etc), but in the end they all result in there being a cost to releasing carbon to the atmosphere. If there is a cost to the emitter for CO2 emissions, payment for that cost will depend on both when the emissions actually occur and how payment is made. Here we outline some of the pricing and payment structures that are possible which result from analogous theories in the life insurance industry. This development not only provides useful constructs for valuing sequestered carbon, but highlights additional motivations for employing a probability distribution approach to unify accounting methodologies for stocks of carbon containing products.

  10. INDEPENDENT COST REVIEW (ICR)

    Energy Savers [EERE]

    experience - as needed - in project management, scheduling, cost estimatingcost engineering, risk management, as well as subject matter experts (SMEs) with knowledge of...

  11. Surveys in Operations Research and Management Science 16 (2011) 4966 Contents lists available at ScienceDirect

    E-Print Network [OSTI]

    Uryasev, Stanislav

    2011-01-01T23:59:59.000Z

    Surveys in Operations Research and Management Science 16 (2011) 49­66 Contents lists available at ScienceDirect Surveys in Operations Research and Management Science journal homepage: www 2010 Accepted 8 August 2010 a b s t r a c t This paper surveys the most recent advances in the context

  12. Waste management facilities cost information for transportation of radioactive and hazardous materials

    SciTech Connect (OSTI)

    Feizollahi, F.; Shropshire, D.; Burton, D.

    1995-06-01T23:59:59.000Z

    This report contains cost information on the U.S. Department of Energy (DOE) Complex waste streams that will be addressed by DOE in the programmatic environmental impact statement (PEIS) project. It describes the results of the task commissioned by DOE to develop cost information for transportation of radioactive and hazardous waste. It contains transportation costs for most types of DOE waste streams: low-level waste (LLW), mixed low-level waste (MLLW), alpha LLW and alpha MLLW, Greater-Than-Class C (GTCC) LLW and DOE equivalent waste, transuranic (TRU) waste, spent nuclear fuel (SNF), and hazardous waste. Unit rates for transportation of contact-handled (<200 mrem/hr contact dose) and remote-handled (>200 mrem/hr contact dose) radioactive waste are estimated. Land transportation of radioactive and hazardous waste is subject to regulations promulgated by DOE, the U.S. Department of Transportation (DOT), the U.S. Nuclear Regulatory Commission (NRC), and state and local agencies. The cost estimates in this report assume compliance with applicable regulations.

  13. A Comparison of Maintenance Cost, Labor Demands, and System Performance for LID and Conventional Stormwater Management

    E-Print Network [OSTI]

    operations and maintenance. Due to increasing requirements for more effective treatment of runoff, and a subsurface gravel wetland, to $11-$21 per kg/yr TSS removed for a wet pond, a dry pond, and a sand filter maintenance burdens (as measured by cost and personnel hours) and higher water quality treatment capabilities

  14. Managing the Cost, Energy Consumption, and Carbon Footprint of Internet Services

    E-Print Network [OSTI]

    Bianchini, Ricardo

    or "green" energy. This paper introduces a general, optimization-based framework for enabling multi-data-center services to manage their brown en- ergy consumption and leverage green energy, while respecting their SLAs. "green" or renewable energy.) We argue that placing caps on the brown energy consumption of data centers

  15. Minimizing Energy Costs Through Water Management in the Pulp and Paper Industry

    E-Print Network [OSTI]

    Wilson, P. H.

    The quantity of steam required by a pulp and paper mill, as well as the quantity of power generated can effectively be optimized by managing the water cycles in the mill. This approach addresses the process systems within the mill and investigates...

  16. Aeronautical System Center's environmental compliance assessment and management program's cost-saving initiatives support the Air Force's acquisition reform initiative

    SciTech Connect (OSTI)

    Meanor, T.

    1999-07-01T23:59:59.000Z

    The Environmental Management directorate of ASC (ASC/EM) has the responsibility of providing government oversight for the Government Owned Contractor Operated Aircraft and Missile plants (GOCOs). This oversight is manifested as a landlord role where Air Force provides the funding required to maintain the plant facilities including buildings and utilities as well as environmental systems. By agreement the companies operating the plants are required to operate them in accordance with environmental law. Presently the GOCOs include Air Force Plant (AFP) 6 in Marietta Ga., AFP 4 in Fort Worth, Tx., AFP 44 in Tucson, Az., AFP 42 in Palmdale, Ca., and AFP PJKS in Denver, Co. Lockheed Martin corporation operates AFPs 4,6, PJKS and a portion of AFP 42 while AFP 44 is operated by Raytheon Missile Systems Company. Other GOCOs at AFP 42 are Northrup-Grumman, Boeing, and Cabaco, the facilities engineer. Since 1992 the Environmental Management division has conducted its Environmental Compliance Assessment and Management Program assessments (ECAMP) annually at each of the plants. Using DOD's ECAMP Team Guide and teams comprised of both Air Force and consultant engineering personnel, each plant is assessed for its environmental compliance well being. In the face of rising operational costs and diminishing budgets ASC/EM performed a comprehensive review of its ECAMP. As a result, the basic ECAMP program was improved to reduce costs without compromising on quality of the effort. The program retained its emphasis in providing a snap-shot evaluation of each Air Force plant's environmental compliance health supported by complete but tailored protocol assessments.

  17. Direct

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign: Potential ApplicationYu,EnergyDimitriDirac ChargeDiracDirect

  18. Rangeland Resource Management for Texans: Total Resource Management

    E-Print Network [OSTI]

    Hanselka, C. Wayne; Fox, William E.; White, Larry D.

    2004-03-26T23:59:59.000Z

    The Total Resource Management approach helps ranchers make strategic, tactical and operational decisions for the best, most cost-effective use of resources. This publication offers step-by-step directions for implementing TRM for a profitable...

  19. Energy Efficiency Improvement and Cost Saving Opportunities for Cement Making. An ENERGY STAR Guide for Energy and Plant Managers

    SciTech Connect (OSTI)

    Galitsky, Christina; Worrell, Ernst; Galitsky, Christina

    2008-01-01T23:59:59.000Z

    The cost of energy as part of the total production costs in the cement industry is significant, warranting attention for energy efficiency to improve the bottom line. Historically, energy intensity has declined, although more recently energy intensity seems to have stabilized with the gains. Coal and coke are currently the primary fuels for the sector, supplanting the dominance of natural gas in the 1970s. Most recently, there is a slight increase in the use of waste fuels, including tires. Between 1970 and 1999, primary physical energy intensity for cement production dropped 1 percent/year from 7.3 MBtu/short ton to 5.3 MBtu/short ton. Carbon dioxide intensity due to fuel consumption and raw material calcination dropped 16 percent, from 609 lb. C/ton of cement (0.31 tC/tonne) to 510 lb. C/ton cement (0.26 tC/tonne). Despite the historic progress, there is ample room for energy efficiency improvement. The relatively high share of wet-process plants (25 percent of clinker production in 1999 in the U.S.) suggests the existence of a considerable potential, when compared to other industrialized countries. We examined over 40 energy efficient technologies and measures and estimated energy savings, carbon dioxide savings, investment costs, and operation and maintenance costs for each of the measures. The report describes the measures and experiences of cement plants around the wold with these practices and technologies. Substantial potential for energy efficiency improvement exists in the cement industry and in individual plants. A portion of this potential will be achieved as part of (natural) modernization and expansion of existing facilities, as well as construction of new plants in particular regions. Still, a relatively large potential for improved energy management practices exists.

  20. Low cost fuel cell diffusion layer configured for optimized anode water management

    DOE Patents [OSTI]

    Owejan, Jon P; Nicotera, Paul D; Mench, Matthew M; Evans, Robert E

    2013-08-27T23:59:59.000Z

    A fuel cell comprises a cathode gas diffusion layer, a cathode catalyst layer, an anode gas diffusion layer, an anode catalyst layer and an electrolyte. The diffusion resistance of the anode gas diffusion layer when operated with anode fuel is higher than the diffusion resistance of the cathode gas diffusion layer. The anode gas diffusion layer may comprise filler particles having in-plane platelet geometries and be made of lower cost materials and manufacturing processes than currently available commercial carbon fiber substrates. The diffusion resistance difference between the anode gas diffusion layer and the cathode gas diffusion layer may allow for passive water balance control.

  1. Low-cost, highly efficient, and tunable ultrafast laser technology based on directly diode-pumped Cr:Colquiriites

    E-Print Network [OSTI]

    Demirbas, Umit

    2010-01-01T23:59:59.000Z

    This doctoral project aims to develop robust, ultra low-cost ($5,000-20,000), highly-efficient, and tunable femtosecond laser technology based on diode-pumped Cr:Colquiriite gain media (Cr:LiCAF, Cr3+:LiSAF and Cr:LiSGaF). ...

  2. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-16T23:59:59.000Z

    This Guide provides a framework for identifying and managing key technical, schedule, and cost risks through applying the requirements of DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE G 413.3-7A, dated 1-12-11. Does not cancel other directives.

  3. Cost estimate report for the long-term management of depleted uranium hexafluoride : storage of depleted uranium metal.

    SciTech Connect (OSTI)

    Folga, S.M.; Kier, P.H.; Thimmapuram, P.R.

    2001-01-24T23:59:59.000Z

    This report contains a cost analysis of the long-term storage of depleted uranium in the form of uranium metal. Three options are considered for storage of the depleted uranium. These options are aboveground buildings, partly underground vaults, and mined cavities. Three cases are presented. In the first case, all the depleted uranium metal that would be produced from the conversion of depleted uranium hexafluoride (UF{sub 6}) generated by the US Department of Energy (DOE) prior to July 1993 would be stored at the storage facility (100% Case). In the second case, half the depleted uranium metal would be stored at this storage facility (50% Case). In the third case, one-quarter of the depleted uranium metal would be stored at the storage facility (25% Case). The technical basis for the cost analysis presented in this report is principally found in the companion report, ANL/EAD/TM-100, ''Engineering Analysis Report for the Long-Term Management of Depleted Uranium Hexafluoride: Storage of Depleted Uranium Metal'', prepared by Argonne National Laboratory.

  4. Preliminary estimates of the total-system cost for the restructured program: An addendum to the May 1989 analysis of the total-system life cycle cost for the Civilian Radioactive Waste Management Program

    SciTech Connect (OSTI)

    NONE

    1990-12-01T23:59:59.000Z

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy`s (DOE) Civilian Radioactive Waste Management Program is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 - a fee levied on electricity generated and sold by commercial nuclear power plants - is sufficient to cover the cost of the program. This report provides cost estimates for the sixth annual evaluation of the adequacy of the fee. The costs contained in this report represent a preliminary analysis of the cost impacts associated with the Secretary of Energy`s Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program issued in November 1989. The major elements of the restructured program announced in this report which pertain to the program`s life-cycle costs are: a prioritization of the scientific investigations program at the Yucca Mountain candidate site to focus on identification of potentially adverse conditions, a delay in the start of repository operations until 2010, the start of limited waste acceptance at the monitored retrievable storage (MRS) facility in 1998, and the start of waste acceptance at the full-capability MRS facility in 2,000. Based on the restructured program, the total-system cost for the system with a repository at the candidate site at Yucca Mountain in Nevada, a facility for monitored retrievable storage (MRS), and a transportation system is estimated at $26 billion (expressed in constant 1988 dollars). In the event that a second repository is required and is authorized by the Congress, the total-system cost is estimated at $34 to $35 billion, depending on the quantity of spent fuel and high-level waste (HLW) requiring disposal. 17 figs., 17 tabs.

  5. Statistical Directions for the Analysis of Participatory Mobile Health Asthma Management Data

    E-Print Network [OSTI]

    Hasenstab, Kyle Andrew

    2012-01-01T23:59:59.000Z

    using mobile phone technology for the management of theirmanagement. Usage studies of modern mobile technologies have

  6. Energy Efficiency Improvement and Cost Saving Opportunities for the Glass Industry. An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Worrell, Ernst

    2008-01-01T23:59:59.000Z

    actions, develop an energy management plan for business; andinternal support for a business energy management program ishowever, support for business energy management programs can

  7. Energy Efficiency Improvement and Cost Saving Opportunities for Cement Making. An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Worrell, Ernst

    2008-01-01T23:59:59.000Z

    Technology and Energy Management” Zement-Kalk-Gips 47 : 630-and Bezant, K.W. , 1990. “Energy Management in the UK Cementpotential for improved energy management practices exists.

  8. Energy Efficiency Improvement and Cost Saving Opportunities for the Glass Industry. An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Worrell, Ernst

    2008-01-01T23:59:59.000Z

    actions, develop an energy management plan for business; and38. Caffal, C. (1995). Energy Management in Industry. Centre2005a). Guidelines for Energy Management. United States

  9. Energy Efficiency Improvement and Cost Saving Opportunities for the Pharmaceutical Industry. An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Galitsky, Christina

    2008-01-01T23:59:59.000Z

    2005). Guidelines for Energy Management. Washington, D.C.Caffal, C. (1995). Energy Management in Industry. Centre forfor improving your energy management practices. Resources

  10. Depressurization as an accident management strategy to minimize the consequences of direct containment heating

    SciTech Connect (OSTI)

    Hanson, D.J.; Golden, D.W.; Chambers, R.; Miller, J.D.; Hallbert, B.P.; Dobbe, C.A. (EG and G Idaho, Inc., Idaho Falls, ID (USA))

    1990-10-01T23:59:59.000Z

    Probabilistic Risk Assessments (PRAs) have identified severe accidents for nuclear power plants that have the potential to cause failure of the containment through direct containment heating (DCH). Prevention of DCH or mitigation of its effects may be possible using accident management strategies that intentionally depressurize the reactor coolant system (RCS). The effectiveness of intentional depressurization during a station blackout TMLB' sequence was evaluated considering the phenomenological behavior, hardware performance, and operational performance. Phenomenological behavior was calculated using the SCDAP/RELAP5 severe accident analysis code. Two strategies to mitigate DCH by depressurization of the RCS were considered. One strategy, called early depressurization, assumed that the reactor head vent and pressurizer power-operated relief valves (PORVs) were latched open at steam generator dryout. The second strategy, called late depression, assumed that the head vent and PORVs were latched open at a core exit temperature of {approximately}922 K (1200{degree}F). Depressurization of the RCS to a low value that may mitigate DCH was predicted prior to reactor pressure vessel breach for both early and late depressurization. The strategy of late depressurization is preferred over early depressurization because there are greater opportunities to recover plant functions prior to core damage and because failure uncertainties are lessened. 22 refs., 38 figs., 6 tabs.

  11. Energy Efficiency Improvement and Cost Saving Opportunities for the Glass Industry. An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Worrell, Ernst

    2008-01-01T23:59:59.000Z

    size distribution at low energy costs. New grinding technologies are regularly introduced in the market.

  12. The value of a Pavement Management System (PMS) and the planning and cost-benefit tools it provides for decision making have long been recognized

    E-Print Network [OSTI]

    Neimark, Alexander V.

    The value of a Pavement Management System (PMS) and the planning and cost-benefit tools it provides this scenario: as a DOT pavement and main- tenance engineer, you are faced with budgeting the maintenance to the Rutgers' Center for Advanced Infrastructure and Transportation (CAIT) for help. Teams from CAIT's Pavement

  13. Improved Battery Pack Thermal Management to Reduce Cost and Increase Energy Density: Cooperative Research and Development Final Report, CRADA Number CRD-12-499

    SciTech Connect (OSTI)

    Smith, K.

    2013-10-01T23:59:59.000Z

    Under this CRADA NREL will support Creare's project for the Department of Energy entitled 'Improved Battery Pack Thermal Management to Reduce Cost and Increase Energy Density' which involves the development of an air-flow based cooling product that increases energy density, safety, and reliability of hybrid electric vehicle battery packs.

  14. Life-cycle costing manual for the Federal energy management program: a guide for evaluating the cost effectiveness of energy conservation and renewable energy projects for new and existing Federally owned and leased buildings and facilities. Final report

    SciTech Connect (OSTI)

    Ruegg, R.T.

    1980-12-01T23:59:59.000Z

    This manual is a guide to understanding the life-cycle costing method and an aid to calculating the measures required for evaluating energy conservation and renewable energy investments in all Federal buildings. It expands upon life-cycle costing criteria contained in the Program Rules of the Federal Energy Management Program (Subpart A of Part 436, Title 10, US Code of Federal Regulations) and is consistent with those criteria. Its purpose is to facilitate the implementation of the Program Rules by explaining the life-cycle costing method, defining the measures, describing the assumptions and procedures to follow in performing evaluations, and giving examples. It provides worksheets, a computer program, and instructions for calculating the required measurements. The life-cycle costing method and evaluation procedures set forth in the Federal Energy Management Program Rules and described in greater detail in this guide are to be followed by all Federal agencies for all energy conservation and renewable energy projects undertaken in new and existing buildings and facilities owned or leased by the Federal government, unless specifically exempted. The establishment of the methods and procedures and their use by Federal agencies to evaluate energy conservation and solar energy investments are required by Section 381(a) (2) of the Energy Policy and Conservation Act, as amended, 42 U.S.C. 6361 (a) (2); Section 10 of Presidential Executive Order 11912, amended; and by Title V of the National Energy Conservation Policy Act, 92 Stat. 3275.

  15. Using Department of Energy (DOE) Order 435.1 To Find a Cost Effective Waste Management Option. - 12241

    SciTech Connect (OSTI)

    LaBarge, Matt [Waste Control Specialists LLC, Dallas, Texas (United States); Frost, Matt [Alliant Corporation, Knoxville, Tennessee (United States)

    2012-07-01T23:59:59.000Z

    The Depleted Uranium Hexafluoride Project in Portsmouth Ohio was faced with an interesting dilemma. During hot functional testing in August 2010, an upset condition caused gaseous depleted uranium hexafluoride (UF{sub 6}) to come in contact with the hydrofluoric acid (HF) vapor stream. Although the resulting uranium contamination found in the condensed aqueous hydrofluoric acid was very low, it exceeded the Department of Energy (DOE) authorized release limit. After evaluating several commercial options for treatment and disposal using the guidelines found in DOE Order 435.1, Waste Control Specialists LLC was selected for the treatment of the waste, with EnergySolutions' Clive facility selected for disposal of the treated residues. The waste was safely transported from Piketon, Ohio to Andrews, Texas, where it was treated to meet the land Disposal Restrictions (LDR), and was disposed in EnergySolutions operational mixed waste cell. The entire effort was interesting for several reasons. The waste was generated during the last year of the first Depleted Uranium Hexafluoride contractor. The waste became additional scope for the new contractor, adding time delays and introducing new personnel into the project. The effort was also unique because it demonstrated the process mandated by DOE Order 435.1 to evaluate all options, including commercial options, could reveal solutions to waste management problems that are currently available and more cost effective, but not well know within the DOE complex. (authors)

  16. Office of Civilian Radioactive Waste Management quarterly report on program cost and schedule, first quarter FY 1988

    SciTech Connect (OSTI)

    NONE

    1988-11-01T23:59:59.000Z

    This report is intended to provide a summary of the cost and schedule performance for the civilian radioactive waste management program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear waste Fund revenues and disbursement. This report includes performance data through December 1987. In December 1987, Congress passed the Nuclear Waste Policy Amendments Act of 1987 which changed the near-term activities of the program. Specifically, This Act required that the tuff site in Nevada be characterized for the first repository and that site-specific activities at the other two first repository sites (the salt site in Texas and the basalt site in Washington) be terminated within 90 days of enactment. The Act also requires the phase-out of all second repository activities designed to evaluate the suitability of crystalline rock as a potential host rock for a repository. The new legislation impacts the contents of this report by focusing the first repository program on the activities of the tuff project and phasing-out the activities for the salt, basalt and second repository projects.

  17. Structural health and prognostics management for offshore wind turbines : case studies of rotor fault and blade damage with initial O&M cost modeling.

    SciTech Connect (OSTI)

    Myrent, Noah J. [Purdue Center for Systems Integrity, Lafayette, IN; Kusnick, Joshua F. [Purdue Center for Systems Integrity, Lafayette, IN; Barrett, Natalie C. [Purdue Center for Systems Integrity, Lafayette, IN; Adams, Douglas E. [Purdue Center for Systems Integrity, Lafayette, IN; Griffith, Daniel Todd

    2013-04-01T23:59:59.000Z

    Operations and maintenance costs for offshore wind plants are significantly higher than the current costs for land-based (onshore) wind plants. One way to reduce these costs would be to implement a structural health and prognostic management (SHPM) system as part of a condition based maintenance paradigm with smart load management and utilize a state-based cost model to assess the economics associated with use of the SHPM system. To facilitate the development of such a system a multi-scale modeling approach developed in prior work is used to identify how the underlying physics of the system are affected by the presence of damage and faults, and how these changes manifest themselves in the operational response of a full turbine. This methodology was used to investigate two case studies: (1) the effects of rotor imbalance due to pitch error (aerodynamic imbalance) and mass imbalance and (2) disbond of the shear web; both on a 5-MW offshore wind turbine in the present report. Based on simulations of damage in the turbine model, the operational measurements that demonstrated the highest sensitivity to the damage/faults were the blade tip accelerations and local pitching moments for both imbalance and shear web disbond. The initial cost model provided a great deal of insight into the estimated savings in operations and maintenance costs due to the implementation of an effective SHPM system. The integration of the health monitoring information and O&M cost versus damage/fault severity information provides the initial steps to identify processes to reduce operations and maintenance costs for an offshore wind farm while increasing turbine availability, revenue, and overall profit.

  18. We present a new profitable trading and risk management strategy with transaction cost for an adaptive equally weighted portfolio. Moreover, we implement a rule-based expert system for

    E-Print Network [OSTI]

    Duran, Ahmet

    We present a new profitable trading and risk management strategy with transaction cost financial decision making process by using the power of spectral analysis. We use sev- eral key components PRESENTS A Profitable Trading and Risk Management Strategy in Presence of Transaction Cost Friday, February

  19. Energy Efficiency Improvement and Cost Saving Opportunities for the Glass Industry. An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Worrell, Ernst

    2008-01-01T23:59:59.000Z

    energy management system discussed above, including setting up a monitoringenergy monitoring and process control systems can play an important role in energy management

  20. Energy Efficiency Improvement and Cost Saving Opportunities for the Pharmaceutical Industry. An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Galitsky, Christina

    2008-01-01T23:59:59.000Z

    Internal support for a business energy management program ishowever, support for business energy management programs canProducts for Business Description: ENERGY STAR identifies

  1. Energy Efficiency Improvement and Cost Saving Opportunities for Cement Making. An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Worrell, Ernst

    2008-01-01T23:59:59.000Z

    internal support for a business energy management program ishowever, support for business energy management programs canProducts for Business Description: ENERGY STAR identifies

  2. A Low-cost, High-yield Process for the Direct Productin of High Energy Density Liquid Fuel from Biomass

    SciTech Connect (OSTI)

    Agrawal, Rakesh

    2014-02-21T23:59:59.000Z

    The primary objective and outcome of this project was the development and validation of a novel, low-cost, high-pressure fast-hydropyrolysis/hydrodeoxygenation (HDO) process (H{sub 2}Bioil) using supplementary hydrogen (H{sub 2}) to produce liquid hydrocarbons from biomass. The research efforts under the various tasks of the project have culminated in the first experimental demonstration of the H2Bioil process, producing 100% deoxygenated >C4+ hydrocarbons containing 36-40% of the carbon in the feed of pyrolysis products from biomass. The demonstrated H{sub 2}Bioil process technology (i.e. reactor, catalyst, and downstream product recovery) is scalable to a commercial level and is estimated to be economically competitive for the cases when supplementary H{sub 2} is sourced from coal, natural gas, or nuclear. Additionally, energy systems modeling has revealed several process integration options based on the H{sub 2}Bioil process for energy and carbon efficient liquid fuel production. All project tasks and milestones were completed or exceeded. Novel, commercially-scalable, high-pressure reactors for both fast-hydropyrolysis and hydrodeoxygenation were constructed, completing Task A. These reactors were capable of operation under a wide-range of conditions; enabling process studies that lead to identification of optimum process conditions. Model compounds representing biomass pyrolysis products were studied, completing Task B. These studies were critical in identifying and developing HDO catalysts to target specific oxygen functional groups. These process and model compound catalyst studies enabled identification of catalysts that achieved 100% deoxygenation of the real biomass feedstock, sorghum, to form hydrocarbons in high yields as part of Task C. The work completed during this grant has identified and validated the novel and commercially scalable H2Bioil process for production of hydrocarbon fuels from biomass. Studies on model compounds as well as real biomass feedstocks were utilized to identify optimized process conditions and selective HDO catalyst for high yield production of hydrocarbons from biomass. In addition to these experimental efforts, in Tasks D and E, we have developed a mathematical optimization framework to identify carbon and energy efficient biomass-to-liquid fuel process designs that integrate the use of different primary energy sources along with biomass (e.g. solar, coal or natural gas) for liquid fuel production. Using this tool, we have identified augmented biomass-to-liquid fuel configurations based on the fast-hydropyrolysis/HDO pathway, which was experimentally studied in this project. The computational approach used for screening alternative process configurations represents a unique contribution to the field of biomass processing for liquid fuel production.

  3. Energy Efficiency Improvement and Cost Saving Opportunities for the U.S. Iron and Steel Industry An ENERGY STAR(R) Guide for Energy and Plant Managers

    SciTech Connect (OSTI)

    Worrell, Ernst; Blinde, Paul; Neelis, Maarten; Blomen, Eliane; Masanet, Eric

    2010-10-21T23:59:59.000Z

    Energy is an important cost factor in the U.S iron and steel industry. Energy efficiency improvement is an important way to reduce these costs and to increase predictable earnings, especially in times of high energy price volatility. There are a variety of opportunities available at individual plants in the U.S. iron and steel industry to reduce energy consumption in a cost-effective manner. This Energy Guide discusses energy efficiency practices and energy-efficient technologies that can be implemented at the component, process, facility, and organizational levels. A discussion of the structure, production trends, energy consumption, and greenhouse gas emissions of the iron and steel industry is provided along with a description of the major process technologies used within the industry. Next, a wide variety of energy efficiency measures are described. Many measure descriptions include expected savings in energy and energy-related costs, based on case study data from real-world applications in the steel and related industries worldwide. Typical measure payback periods and references to further information in the technical literature are also provided, when available. The information in this Energy Guide is intended to help energy and plant managers in the U.S. iron and steel industry reduce energy consumption and greenhouse gas emissions in a cost-effective manner while maintaining the quality of products manufactured. Further research on the economics of all measures?and on their applicability to different production practices?is needed to assess their cost effectiveness at individual plants.

  4. Energy Efficiency Improvement and Cost Saving Opportunities for the Pharmaceutical Industry. An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Galitsky, Christina

    2008-01-01T23:59:59.000Z

    costs, and increased energy awareness among employees (Wyethimprove the awareness of personnel with regard to energy useawareness Build capacity Not addressed No promotion of energy

  5. An Explanation of F&A Costs What are F&A Costs?

    E-Print Network [OSTI]

    An Explanation of F&A Costs What are F&A Costs? Costs involved in conducting sponsored projects are categorized in two ways: direct costs or indirect costs. The federal government refers officially to indirect costs as facilities and administrative (F&A) costs, sometimes simply called "overhead" costs. Direct

  6. Direct Digital Control- A Tool for Energy Management of HVAC Systems

    E-Print Network [OSTI]

    Swanson, K.

    Direct digital control (DDC) applied to heating, ventilating, and air-conditioning (HVAC) systems corrects many of the deficiencies of conventional automatic temperature control systems. By applying new control sequences, DDC optimizes HVAC energy...

  7. Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry: An ENERGY STAR Guide for Energy and Plant Managers

    SciTech Connect (OSTI)

    Galitsky, Christina; Galitsky, Christina; Worrell, Ernst

    2008-01-01T23:59:59.000Z

    The motor vehicle industry in the U.S. spends about $3.6 billion on energy annually. In this report, we focus on auto assembly plants. In the U.S., over 70 assembly plants currently produce 13 million cars and trucks each year. In assembly plants, energy expenditures is a relatively small cost factor in the total production process. Still, as manufacturers face an increasingly competitive environment, energy efficiency improvements can provide a means to reduce costs without negatively affecting the yield or the quality of the product. In addition, reducing energy costs reduces the unpredictability associated with variable energy prices in today?s marketplace, which could negatively affect predictable earnings, an important element for publicly-traded companies such as those in the motor vehicle industry. In this report, we first present a summary of the motor vehicle assembly process and energy use. This is followed by a discussion of energy efficiency opportunities available for assembly plants. Where available, we provide specific primary energy savings for each energy efficiency measure based on case studies, as well as references to technical literature. If available, we have listed costs and typical payback periods. We include experiences of assembly plants worldwide with energy efficiency measures reviewed in the report. Our findings suggest that although most motor vehicle companies in the U.S. have energy management teams or programs, there are still opportunities available at individual plants to reduce energy consumption cost effectively. Further research on the economics of the measures for individual assembly plants, as part of an energy management program, is needed to assess the potential impact of selected technologies at these plants.

  8. Cost effectiveness of recycling: A systems model

    SciTech Connect (OSTI)

    Tonjes, David J., E-mail: david.tonjes@stonybrook.edu [Department of Technology and Society, College of Engineering and Applied Sciences, Stony Brook University, Stony Brook, NY 11794-3560 (United States); Waste Reduction and Management Institute, School of Marine and Atmospheric Sciences, Stony Brook University, Stony Brook, NY 11794-5000 (United States); Center for Bioenergy Research and Development, Advanced Energy Research and Technology Center, Stony Brook University, 1000 Innovation Rd., Stony Brook, NY 11794-6044 (United States); Mallikarjun, Sreekanth, E-mail: sreekanth.mallikarjun@stonybrook.edu [Department of Technology and Society, College of Engineering and Applied Sciences, Stony Brook University, Stony Brook, NY 11794-3560 (United States)

    2013-11-15T23:59:59.000Z

    Highlights: • Curbside collection of recyclables reduces overall system costs over a range of conditions. • When avoided costs for recyclables are large, even high collection costs are supported. • When avoided costs for recyclables are not great, there are reduced opportunities for savings. • For common waste compositions, maximizing curbside recyclables collection always saves money. - Abstract: Financial analytical models of waste management systems have often found that recycling costs exceed direct benefits, and in order to economically justify recycling activities, externalities such as household expenses or environmental impacts must be invoked. Certain more empirically based studies have also found that recycling is more expensive than disposal. Other work, both through models and surveys, have found differently. Here we present an empirical systems model, largely drawn from a suburban Long Island municipality. The model accounts for changes in distribution of effort as recycling tonnages displace disposal tonnages, and the seven different cases examined all show that curbside collection programs that manage up to between 31% and 37% of the waste stream should result in overall system savings. These savings accrue partially because of assumed cost differences in tip fees for recyclables and disposed wastes, and also because recycling can result in a more efficient, cost-effective collection program. These results imply that increases in recycling are justifiable due to cost-savings alone, not on more difficult to measure factors that may not impact program budgets.

  9. International Symposium on New Directions in Urban Water Management 12-14 September 2007, UNESCO Paris

    E-Print Network [OSTI]

    Boyer, Edmond

    periods. Combined systems are equipped with CSOs' devices to avoid overflows on streets or house basement to reach and maintain a good ecological status (EU, Directive 2000). For highly modified water masses like in urban and periurban areas, the objective of a maximal ecological potential must be defined and reached

  10. Cost analysis guidelines

    SciTech Connect (OSTI)

    Strait, R.S.

    1996-01-10T23:59:59.000Z

    The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

  11. Energy Efficiency Improvement and Cost Saving Opportunities for the Petrochemical Industry - An ENERGY STAR(R) Guide for Energy and Plant Managers

    SciTech Connect (OSTI)

    Neelis, Maarten; Worrell, Ernst; Masanet, Eric

    2008-09-01T23:59:59.000Z

    Energy is the most important cost factor in the U.S petrochemical industry, defined in this guide as the chemical industry sectors producing large volume basic and intermediate organic chemicals as well as large volume plastics. The sector spent about $10 billion on fuels and electricity in 2004. Energy efficiency improvement is an important way to reduce these costs and to increase predictable earnings, especially in times of high energy price volatility. There are a variety of opportunities available at individual plants in the U.S. petrochemical industry to reduce energy consumption in a cost-effective manner. This Energy Guide discusses energy efficiency practices and energy efficient technologies that can be implemented at the component, process, facility, and organizational levels. A discussion of the trends, structure, and energy consumption characteristics of the petrochemical industry is provided along with a description of the major process technologies used within the industry. Next, a wide variety of energy efficiency measures are described. Many measure descriptions include expected savings in energy and energy-related costs, based on case study data from real-world applications in the petrochemical and related industries worldwide. Typical measure payback periods and references to further information in the technical literature are also provided, when available. The information in this Energy Guide is intended to help energy and plant managers in the U.S. petrochemical industry reduce energy consumption in a cost-effective manner while maintaining the quality of products manufactured. Further research on the economics of all measures--and on their applicability to different production practices--is needed to assess their cost effectiveness at individual plants.

  12. Department of Energy's Pantex Plant Saves $10 Million in Energy Costs. Federal Energy Management Program (FEMP) ESPC Case Study Fact Sheet

    SciTech Connect (OSTI)

    Ward, C.

    2001-11-20T23:59:59.000Z

    This two-page case study describes how the U.S. Department of Energy's Pantex Plant in Amarillo, Texas, will save approximately $10 million in energy costs over the next 18 years, thanks to a DOE Super Energy Savings Performance Contract (Super ESPC) delivery order for energy efficiency improvements. The delivery order is the largest to date for a DOE facility. Primarily, the delivery order calls for a new, state-of-the-art energy management control system and a new water/steam piping system, which will be purchased and installed by the contracting energy services company (ESCO). The ESCO will then be repaid over the life of the contract out of the plant's resulting energy cost savings.

  13. GUIDANCE ON ADMINISTRATIVE COSTS FOR FEDERAL AWARDS This document includes definitions and examples of expenditure types that would typically be considered unallowable direct charges

    E-Print Network [OSTI]

    Shamos, Michael I.

    GUIDANCE ON ADMINISTRATIVE COSTS FOR FEDERAL AWARDS This document includes definitions and examples Circular A-21 and the Cost Accounting Standards (CAS). This document is meant to be a reference tool to as needed. This document is general in nature and is NOT an exhaustive list of unallowable costs for all

  14. Startup Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

  15. Characterization of Direct Push Vadose Zone Sediments from the T and TY Waste Management Areas

    SciTech Connect (OSTI)

    Brown, Christopher F.; Valenta, Michelle M.; Serne, R. Jeffrey; Bjornstad, Bruce N.; Lanigan, David C.; Iovin, Cristian; Clayton, Ray E.; Geiszler, Keith N.; Clayton, Eric T.; Kutnyakov, Igor V.; Baum, Steven R.; Lindberg, Michael J.; Orr, Robert D.

    2007-06-08T23:59:59.000Z

    This report contains all the geochemical and selected physical characterization data collected on vadose zone sediment recovered from 5 direct push characterization holes emplaced to investigate vadose zone contamination associated with leaks from tanks 241-TY-105 (UPR-200-W-152) and 241-TY-106 (UPR-200-W-153). Tank 241-TY-105 is estimated to have leaked 35,000 gal of tributyl phosphate (TBP) waste from the uranium recovery process to the vadose zone in 1960. Tank 241-TY-106 is estimated to have leaked 20,000 gal of TBP-uranium recovery waste to the vadose zone in 1959. Although several drywells in the vicinity of tank 241-TY-106 contain measurable quantities of cesium-137 and/or cobalt-60, their relatively low concentrations indicate that the contaminant inventory in the vadose zone around tank 241-TY-106 is quite small. Additionally, this report contains all the geochemical and selected physical characterization data collected on vadose zone sediment recovered from 7 direct push characterization holes emplaced to investigate vadose zone contamination associated with an overfill event and leak from tank 241-T-101.

  16. Securing the Sustainability of Global Medical Nuclear Supply Chains Through Economic Cost Recovery, Risk Management, and Optimization

    E-Print Network [OSTI]

    Nagurney, Anna

    , Radioactive decay 1 #12;1. Introduction Each day, 41,000 nuclear medical procedures are performedSecuring the Sustainability of Global Medical Nuclear Supply Chains Through Economic Cost Recovery of the complex operations of medical nuclear supply chains in the case of the radioisotope molybdenum

  17. Energy Efficiency Improvement and Cost Saving Opportunities for Breweries: An ENERGY STAR(R) Guide for Energy and Plant Managers

    SciTech Connect (OSTI)

    Galitsky, Christina; Martin, Nathan; Worrell, Ernst; Lehman, Bryan

    2003-09-01T23:59:59.000Z

    Annually, breweries in the United States spend over $200 million on energy. Energy consumption is equal to 38 percent of the production costs of beer, making energy efficiency improvement an important way to reduce costs, especially in times of high energy price volatility. After a summary of the beer making process and energy use, we examine energy efficiency opportunities available for breweries. We provide specific primary energy savings for each energy efficiency measure based on case studies that have implemented the measures, as well as references to technical literature. If available, we have also listed typical payback periods. Our findings suggest that given available technology, there are still opportunities to reduce energy consumption cost-effectively in the brewing industry. Brewers value highly the quality, taste and drinkability of their beer. Brewing companies have and are expected to continue to spend capital on cost-effective energy conservation measures that meet these quality, taste and drinkability requirements. For individual plants, further research on the economics of the measures, as well as their applicability to different brewing practices, is needed to assess implementation of selected technologies.

  18. Energy Efficiency Improvement and Cost Saving Opportunities for the Fruit and Vegetable Processing Industry. An ENERGY STAR Guide for Energy and Plant Managers

    SciTech Connect (OSTI)

    Masanet, Eric; Masanet, Eric; Worrell, Ernst; Graus, Wina; Galitsky, Christina

    2008-01-01T23:59:59.000Z

    The U.S. fruit and vegetable processing industry--defined in this Energy Guide as facilities engaged in the canning, freezing, and drying or dehydrating of fruits and vegetables--consumes over $800 million worth of purchased fuels and electricity per year. Energy efficiency improvement isan important way to reduce these costs and to increase predictable earnings, especially in times of high energy price volatility. There are a variety of opportunities available at individual plants in the U.S. fruit and vegetable processing industry to reduce energy consumption in a cost-effective manner. This Energy Guide discusses energy efficiency practices and energy-efficient technologies that can be implemented at the component, process, facility, and organizational levels. A discussion of the trends, structure, and energy consumption characteristics of the U.S. fruit and vegetable processing industry is provided along with a description of the major process technologies used within the industry. Next, a wide variety of energy efficiency measures applicable to fruit and vegetable processing plants are described. Many measure descriptions include expected savings in energy and energy-related costs, based on case study data from real-world applications in fruit and vegetable processing facilities and related industries worldwide. Typical measure payback periods and references to further information in the technical literature are also provided, when available. Given the importance of water in fruit and vegetable processing, a summary of basic, proven measures for improving plant-level water efficiency are also provided. The information in this Energy Guide is intended to help energy and plant managers in the U.S. fruit and vegetable processing industry reduce energy and water consumption in a cost-effective manner while maintaining the quality of products manufactured. Further research on the economics of all measures--as well as on their applicability to different production practices--is needed to assess their cost effectiveness at individual plants.

  19. The DOE Office of Environmental Management International Collaboration Program Overview: Interactions, Agreements, and Future Direction

    SciTech Connect (OSTI)

    Marra, James C.; Fox, Kevin M.; Jannik, Gerald T.; Farfan, Eduardo B.; Kim, Dong-Sang; Vienna, John D.; Roach, Jay; Aloy, A. S.; Stefanovsky, S. V.; Lopukh, D. B.; Bondarkov, M. D.; Gerdes, Kurt D.; Han, Ana M.

    2010-02-10T23:59:59.000Z

    As the lead U.S. agency for the environmental cleanup, the Department of Energy (DOE) Office of Environmental Management (EM) carries out international activities in support of U.S. policies and objectives regarding accelerated risk reduction and remediation of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To achieve this, EM pursues collaborations with foreign government organizations, educational institutions, and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. An initiative of the International Program is to link international experience and expertise to the technical needs of the overall EM mission and to foster further collaboration with international partners to promote those needs. This paper will provide an overview of the current international program and how it plans to leverage existing, and when necessary, new international partnerships to support the overall EM cleanup mission. In addition it will examine the future vision of the international program to promote the EM mission through a focus on transformational solutions, science, and technology development.

  20. Vehicle Technologies Office Merit Review 2014: Significant Cost Improvement of Li-ion Cells Through Non-NMP Electrode Coating, Direct Separator Coating, and Fast Formation Technologies

    Broader source: Energy.gov [DOE]

    Presentation given by Johnson Controls at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about significant cost improvement...

  1. Vehicle Technologies Office Merit Review 2015: Significant Cost Improvement of Li-Ion Cells Through Non-NMP Electrode Coating, Direct Separator Coating, and Fast Formation Technologies

    Broader source: Energy.gov [DOE]

    Presentation given by Johnson Controls at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about significant cost improvement...

  2. Effects of commercialized deer hunting arrangements on ranch organization, management, costs, and income--the Llano Basin of Texas

    E-Print Network [OSTI]

    Forrest, Nathan Kelly

    1968-01-01T23:59:59.000Z

    Income and Expense Summary Leasing Arrangements Used to Operate Shooting Preserves Description of Hunting Systems Season lease Day lease Season lease with doe hunting option Season and day lease combination Relative Profitability of the Various.... and Llano Basins . . . . . . . . . . . . . . . . . . . . . 41 7, Percent calf crop for each of the modal ranch 's 41 Cattle sales per acre for each representative ranch , . 43 9. Cash costs invol. ved in operating a season lease hunting system on each...

  3. Cost of a Ride: The Effects of Densities on Fixed-Guideway Transit Ridership and Capital Costs

    E-Print Network [OSTI]

    Guerra, Erick; Cervero, Robert

    2010-01-01T23:59:59.000Z

    rail transit capital cost study update final. Washington,2005). Managing Capital Costs of Major Federally Fundedin US rail transit project cost overrun. Transportation

  4. Engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 series) at the Weldon Spring Site Chemical Plant, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    MacDonell, M M; Peterson, J M

    1989-05-01T23:59:59.000Z

    The US Department of Energy, under its Surplus Facilities Management Program (SFMP), is responsible for cleanup activities at the Weldon-Spring site, located near Weldon Spring, Missouri. The site consists of two noncontiguous areas: (1) a raffinate pits and chemical plant area and (2) a quarry. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support a proposed removal action to manage 15 nonprocess buildings, identified as the 15 Series buildings, at the chemical plant on the Weldon Spring site. These buildings have been nonoperational for more than 20 years, and the deterioration that has occurred during this time has resulted in a potential threat to site workers, the general public, and the environment. The EE/CA documentation of this proposed action is consistent with guidance from the US Environmental Protection Agency (EPA) that addresses removal actions at sites subject to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986. Actions at the Weldon Spring site are subject to CERCLA requirements because the site is on the EPA`s National Priorities List. The objectives of this report are to (1) identify alternatives for management of the nonprocess buildings; (2) document the selection of response activities that will mitigate the potential threat to workers, the public, and the environment associated with these buildings; and (3) address environmental impacts associated with the proposed action.

  5. Energy-Smart Building Choices: How School Facilities Managers and Business Officials Are Reducing Operating Costs and Saving Money (Revision)

    SciTech Connect (OSTI)

    Not Available

    2002-02-01T23:59:59.000Z

    Operating a typical school today is no easy task for facilities managers and business officials. You're expected to deliver increased services with constrained operating budgets. Many schools stay open for longer hours to accommodate community use of the facilities. Dilapidated buildings and systems gobble up energy, yet in many districts, maintenance needs are overshadowed by the need for expansion or new construction to serve growing student populations and changing educational needs.

  6. Vehicle Technologies Office Merit Review 2014: Cost-Competitive Advanced Thermoelectric Generators for Direct Conversion of Vehicle Waste Heat into Useful Electrical Power

    Broader source: Energy.gov [DOE]

    Presentation given by General Motors at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about cost-competitive advanced...

  7. Operating Costs Estimates Cost Indices

    E-Print Network [OSTI]

    Boisvert, Jeff

    to update costs of specific equipment, raw material or labor or CAPEX and OPEX of entire plants Cost Indices

  8. Plant Energy Cost Optimization Program (PECOP)

    E-Print Network [OSTI]

    Robinson, A. M.

    1980-01-01T23:59:59.000Z

    The Plant Energy Cost Optimization Program (PECOP) is a Management System designed to reduce operating cost in a continuous operating multi product plant by reviewing all cost factors and selecting plant wide production schedules which are most...

  9. Development of advanced direct perception displays for nuclear power plants to enhance monitoring, control and fault management

    SciTech Connect (OSTI)

    Jones, B.G.; Shaheen, S.; Moray, N. [and others

    1997-08-01T23:59:59.000Z

    Traditional Single-Sensor-Single Indicator (SSSI) displays are poorly matched to the cognitive abilities of operators, especially for large and complex systems. It is difficult for operators to monitor very large arrays of displays and controls, and to integrate the information displayed therein. In addition, standard operating procedures (SOPs) are bulky (running to many hundreds of pages) and difficult to use, and operators may become lost. For these reasons, and also because it is becoming increasingly difficult to find replacements for aging hardware components, there is a trend towards computerized graphical interfaces for nuclear power plants (NPPs). There is, however, little rational theory for display design in this domain. This report describes some recent theoretical developments and shows how to develop displays which will greatly reduce the cognitive load on the operator and allow the use of perceptual rather than cognitive mechanisms while using SON and to support state diagnosis and fault management. The report outlines the conceptual framework within which such a new approach could be developed, and provides an example of how the operating procedures for the start-up sequence of a NPP could be realized. A detailed description of a set of displays for a graphical interface for the SON of the feedwater system is provided as an example of how the proposed approach could be realized, and a general account of how it would fit into the overall start-up sequence is given. Examples of {open_quotes}direct perception{close_quotes} or {open_quotes}ecological{close_quotes} configural state space displays to support the use of the proposed direct manipulation SOP interface are provided, and also a critical discussion which identifies some difficulties which may be anticipated should the general approach herein advocated be adopted.

  10. Contracts and management services site support program plan WBS 6.10.14

    SciTech Connect (OSTI)

    Knoll, J.M. Jr.

    1994-09-01T23:59:59.000Z

    Contracts and Management Services is recognized as the central focal point for programs having company or sitewide application in pursuit of the Hanford Missions`s financial and operational objectives. Contracts and Management Services actively pursues cost savings and operational efficiencies through: Management Standards by ensuring all employees have an accessible, integrated system of clear, complete, accurate, timely, and useful management control policies and procedures; Contract Reform by restructuring the contract, organization, and cost accounting systems to refocus Hanford contract activities on output products; Systems and Operations Evaluation by directing the Cost Reduction program, Great Ideas, and Span of Management activities; Program Administration by enforcing conditions of Accountability (whether DEAR-based or FAR-based) for WHC, BCSR, ICF KH, and BHI; Contract Performance activities; chairing the WHC Cost Reduction Review Board; and analyzing companywide Performance Measures; Data Standards and Administration by establishing and directing the company data management program; giving direction to the major RL programs and mission areas for implementation of cost-effective and efficient data management practices; directing all operations, application, and interfaces contained within the Hanford PeopleCore System; directing accomplishment and delivery of TPA data management milestones; and directing the sitewide data management processes for Data Standards and the Data Directory.

  11. Top Management Involvement in the Adoption of Energy Efficiency Projects

    E-Print Network [OSTI]

    Blass, Vered; Corbett, Charles J.; Delmas, Magali A; Muthulingam, Suresh

    2011-01-01T23:59:59.000Z

    of Recommendations Top Management * Energy Costs/Sales TopTop Management Top Management * Energy Costs/Sales TopTop Management Top Management * Energy Costs/Sales Top

  12. SEGALL, NOA. Design and Prototyping of a Cognitive Model-Based Decision Support Tool for Anesthesia Provider Management of Crisis Situations. (Under the direction of David B.

    E-Print Network [OSTI]

    Kaber, David B.

    for Anesthesia Provider Management of Crisis Situations. (Under the direction of David B. Kaber.) This research crisis situations that would prompt the anesthesia provider to contact an attending physician. In addition, the tool could be used by practitioners working alone to deliver anesthesia. A novel approach

  13. Energy Efficiency Improvement and Cost Saving Opportunities for the Fruit and Vegetable Processing Industry. An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Masanet, Eric

    2008-01-01T23:59:59.000Z

    actions, develop an energy management plan for business; andInternal support for a business energy management program ishowever, support for business energy management programs can

  14. Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry: An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Galitsky, Christina

    2008-01-01T23:59:59.000Z

    internal support for a business energy management program ishowever, support for business energy management programs cansupport). Support for a business energy management program

  15. IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Brown, Moya Melody, Camilla Dunham Whitehead, Rich

    2011-01-01T23:59:59.000Z

    2005. Navigating Energy Management: A Roadmap for Business.Characteristics and Energy Management Opportunities. BurtonCaffal, C. 1995. Energy Management in Industry. Centre for

  16. Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry: An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Galitsky, Christina

    2008-01-01T23:59:59.000Z

    Caffal, C. (1995). Energy Management in Industry. Centre forPollution Prevention/Energy Management. General Motorsactions, develop an energy management plan for business; and

  17. Energy Efficiency Improvement and Cost Saving Opportunities for the Fruit and Vegetable Processing Industry. An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Masanet, Eric

    2008-01-01T23:59:59.000Z

    actions, develop an energy management plan for business; andCaffal, C. (1995). Energy Management in Industry. Centre forEquipment. Federal Energy Management Program, Washington,

  18. Management Analyst

    Broader source: Energy.gov [DOE]

    The Wind and Water Power Technologies Office (WWPTO) manages efforts to improve performance, lower costs, and accelerate deployment of wind and water power technologies, which can play a...

  19. KM Central, ICASIT List of Ph.D. Dissertations & Theses, ProQuest Direct -in Knowledge Management from 1991 2006

    E-Print Network [OSTI]

    Lien, Jyh-Ming

    -technical investigation of the determinants of knowledge management systems usage Al-Busaidi, Kamla Ali Ph-level instructional renewal Edge, Karen Ph.D. University of Toronto (Canada) 197 NR02925 12 Knowledge management

  20. A Fresh Perspective for Managing Water in California: Insights from Applying the European Water Framework Directive to the Russian River

    E-Print Network [OSTI]

    Grantham, Ted; Christian-Smith, Juliet; Kondolf, G. Mathias; Scheuer, Stefan

    2008-01-01T23:59:59.000Z

    Stormwater Management Hydropower Generation Wastewateragricultural irrigation, hydropower, industry, fishing,dams for water storage and hydropower and diversions for

  1. Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry: An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Galitsky, Christina

    2008-01-01T23:59:59.000Z

    Costs Reduced by Automatic Control System. Case Study 137.Air Costs Reduced by Automatic Control System. Case studyrefined by automatic control systems and transfer machines,

  2. AN ALERT MANAGEMENT APPROACH TO DATA QUALITY: LESSONS LEARNED FROM THE

    E-Print Network [OSTI]

    Grossman, Robert

    AN ALERT MANAGEMENT APPROACH TO DATA QUALITY: LESSONS LEARNED FROM THE VISA DATA AUTHORITY PROGRAM, Alert Management Systems INTRODUCTION There is now a relatively mature model, which is usually called of the time and costs involved, the framework we introduce directly manages data quality alerts and associated

  3. Evaluating cost-reduction alternatives and low-cost sourcing opportunities for aerospace castings and forgings

    E-Print Network [OSTI]

    Obermoller, Amber J

    2008-01-01T23:59:59.000Z

    As companies continue to outsource large portions of their manufacturing, managing costs in the supply chain is increasingly important in reducing overall costs and remaining competitive. Low-cost sourcing has become an ...

  4. Notice of Intent to Develop Department of Energy Order 206.2 on Identity, Credential, and Access Management (ICAM)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-06-29T23:59:59.000Z

    The purpose of the proposed directive is to replace the information contained in DOE N 206.4, "Personal Identity Verification," approved June 29, 2007, and to establish a DOE directive on Identity, Credential, and Access Management (ICAM). Implementation of ICAM will result in cost avoidance and cost savings allowing reinvestment in DOE mission related work.

  5. Energy Efficiency Improvement and Cost Saving Opportunities for the Petrochemical Industry - An ENERGY STAR(R) Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Neelis, Maarten

    2008-01-01T23:59:59.000Z

    Caffal, C. (1995). Energy Management in Industry. Centre forU.S. DOE-OIT (2003a). Energy Management Program Benefits.actions, develop an energy management plan for business; and

  6. Energy Efficiency Improvement and Cost Saving Opportunities for the U.S. Iron and Steel Industry An ENERGY STAR(R) Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Worrell, Ernst

    2011-01-01T23:59:59.000Z

    actions, develop an energy management plan for business; andFigure 8-1. Main elements of a strategic energy managementCaffal, C. (1995). Energy Management in Industry. Centre for

  7. Energy Efficiency Improvement and Cost Saving Opportunities for the Petrochemical Industry - An ENERGY STAR(R) Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Neelis, Maarten

    2008-01-01T23:59:59.000Z

    site energy monitoring and management systems can increaseenergy monitoring and process control systems can play an important role in energy management

  8. Decommissioning Unit Cost Data

    SciTech Connect (OSTI)

    Sanford, P. C.; Stevens, J. L.; Brandt, R.

    2002-02-26T23:59:59.000Z

    The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

  9. Project Management Design, Value & Cost

    E-Print Network [OSTI]

    Evans, Paul

    and Environmental Sciences Global Food Security Food Security and Food Systems Analysis Food security and development cooperation Conservation Conservation Priorities Environmental Assessment and Consultancy GIS Science and Technology Biotechnology Techniques in Macromolecular Analysis Special Topics in Biotechnology

  10. Report to Congress on the U.S. Department of Energy`s Environmental Management Science Program: Research funded and its linkages to environmental cleanup problems, and high out-year cost environmental management project descriptions. Volume 3 of 3 -- Appendix C

    SciTech Connect (OSTI)

    NONE

    1998-04-01T23:59:59.000Z

    The Department of Energy`s Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation`s nuclear complex. Appendix C provides details about each of the Department`s 82 high cost projects and lists the EMSP research awards with potential to impact each of these projects. The high cost projects listed are those having costs greater than $50 million in constant 1998 dollars from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and having costs of quantities of material associated with an environmental management problem area. The high cost project information is grouped by operations office and organized by site and project code. Each operations office section begins with a list of research needs associated with that operations office. Potentially related research awards are listed by problem area in the Index of Research Awards by Environmental Management Problem Area, which can be found at the end of appendices B and C. For projects that address high risks to the public, workers, or the environment, refer also the Health/Ecology/Risk problem area awards. Research needs are programmatic or technical challenges that may benefit from knowledge gained through basic research.

  11. EV Everywhere Grand Challenge - Battery Status and Cost Reduction...

    Energy Savers [EERE]

    Status and Cost Reduction Prospects EV Everywhere Grand Challenge - Battery Status and Cost Reduction Prospects Presentation given by technology manager David Howell at the EV...

  12. Melanoma costs: A dynamic model comparing estimated overall costs of various clinical stages

    E-Print Network [OSTI]

    Alexandrescu, Doru Traian

    2009-01-01T23:59:59.000Z

    AL. Trends in treatment costs for localized prostate cancer:R, Elkin EP, et al. Cumulative cost pattern comparison ofAn estimate of the annual direct cost of treating cutaneous

  13. Cost of documenting the NISC project.

    SciTech Connect (OSTI)

    Stutz, R. A. (Roger Alan)

    2003-01-01T23:59:59.000Z

    The project team selected a computer-based approach for the NISC project record management system. The team is convinced that this approach did cut direct costs . The major advantage, that the team believes did help the project, comes in the area of having just one central point for all design and construction information related to the project . The other benefit to the project will come over the thirty-year design life of the project through reduced costs to design changes to the facility . The team estimates that a reasonable saving for the project (including future modifications) will be about $2,OOOK or about 3% of the project construction costs . The cost increase of scanning non-electric documents will decrease for other projects in the future as more project related information is computer generated . Many the subcontractors on the NISC project had not completely converted to computer based systems for there own internal operation during the life of the NISC project. However, as more project related documents are generated in electronic form this type of cost will reduce .

  14. Life Cycle Cost Analysis for Sustainable Buildings

    Broader source: Energy.gov [DOE]

    To help facility managers make sound decisions, FEMP provides guidance and resources on applying life cycle cost analysis (LCCA) to evaluate the cost-effectiveness of energy and water efficiency investments.

  15. Energy Efficiency Improvement and Cost Saving Opportunities for the Fruit and Vegetable Processing Industry. An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Masanet, Eric

    2008-01-01T23:59:59.000Z

    E. Masanet (2005a). Energy Efficiency Improvement and CostA.R. Ganji (2005). Energy Efficiency Opportunities in FreshSummer Study on Energy Efficiency in Industry, American

  16. IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers

    SciTech Connect (OSTI)

    Melody, Moya; Dunham Whitehead, Camilla; Brown, Richard

    2010-09-30T23:59:59.000Z

    As American drinking water agencies face higher production costs, demand, and energy prices, they seek opportunities to reduce costs without negatively affecting the quality of the water they deliver. This guide describes resources for cost-effectively improving the energy efficiency of U.S. public drinking water facilities. The guide (1) describes areas of opportunity for improving energy efficiency in drinking water facilities; (2) provides detailed descriptions of resources to consult for each area of opportunity; (3) offers supplementary suggestions and information for the area; and (4) presents illustrative case studies, including analysis of cost-effectiveness.

  17. Light-weight, Low Cost PEM Fuel Cell Stacks Case Western Reserve University

    E-Print Network [OSTI]

    , Feb 13-14, 2007 #12;DOE Technical Barriers Addressed Cost: Known manufacturing processes ­ printing components Minimal balance of plant ­ lower parasitic losses Lower W/cm2, but higher kW/kg Air Management directly on CCM · Molded housings for sub-stack · Series electrical connection between cells · Reactant

  18. Energy Efficiency Improvement and Cost Saving Opportunities for the Fruit and Vegetable Processing Industry. An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Masanet, Eric

    2008-01-01T23:59:59.000Z

    Energy monitoring systems are key tools that play an important role in energy management. Energy monitoring systems

  19. Contracting with reading costs and renegotiation costs

    E-Print Network [OSTI]

    Brennan, James R.

    2007-01-01T23:59:59.000Z

    Reading Costs, Competition, and ContractReading Costs . . . . . . . . . . . . . . . . C. EquilibriumUnconscionability A?ect Reading Costs . . . . . . . . . .

  20. Costs influence male mate choice in a freshwater fish

    E-Print Network [OSTI]

    Keogh, Scott

    Costs influence male mate choice in a freshwater fish Bob B. M. Wong* and Michael D. Jennions that female mate choice decisions depend on the direct costs of choosing (either because of search costs or male-imposed costs). Far less is known about how direct fitness costs affect male mate choice. We

  1. FLORIDA STATE UNIVERSITY Participant Support Costs

    E-Print Network [OSTI]

    Weston, Ken

    FLORIDA STATE UNIVERSITY Policy on Participant Support Costs Effective: May 15, 2006 Purpose costs are separately accounted for, and expended for appropriate and intended objectives. Background in the conference, workshop or training activity. Participant supports costs are defined as direct costs for items

  2. Energy Storage Management for VG Integration (Presentation)

    SciTech Connect (OSTI)

    Kirby, B.

    2011-10-01T23:59:59.000Z

    This presentation describes how you economically manage integration costs of storage and variable generation.

  3. IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Brown, Moya Melody, Camilla Dunham Whitehead, Rich

    2011-01-01T23:59:59.000Z

    energy management into their business and manufacturing operations, leading to reduced costscosts. Available at: http://www.energystar.gov/ia/business/government/Financial_Energy_

  4. IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Brown, Moya Melody, Camilla Dunham Whitehead, Rich

    2011-01-01T23:59:59.000Z

    3. defining the performance indicator(s) to use to measureand targets; 6. performance indicators; 7. appropriateManager/Energy Performance Indicators. Extensive regular

  5. Energy Efficiency Improvement and Cost Saving Opportunities for the U.S. Iron and Steel Industry An ENERGY STAR(R) Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Worrell, Ernst

    2011-01-01T23:59:59.000Z

    actions, develop an energy management plan for business; andProducts for Business Description: ENERGY STAR identifiessupport Energy Team Members from business units, operations/

  6. Energy Efficiency Improvement and Cost Saving Opportunities for the Petrochemical Industry - An ENERGY STAR(R) Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Neelis, Maarten

    2008-01-01T23:59:59.000Z

    actions, develop an energy management plan for business; andProducts for Business Description: ENERGY STAR identifiesplan. The energy conservation leader sponsors business and

  7. Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry: An ENERGY STAR Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Galitsky, Christina

    2008-01-01T23:59:59.000Z

    eines Energiemanagementsystems bei BMW Motoren. Europeanits business operations. BMW adopted an energy management2.6 years (CADDET, 1995c). BMW applied powder coats at their

  8. IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Brown, Moya Melody, Camilla Dunham Whitehead, Rich

    2011-01-01T23:59:59.000Z

    MGD)—Weighted Average Total Use Treatment electricity costelectricity cost Units kWh kW kWh kW Source Water (by MGD)—Weighted Averagecosts are for electricity (EPRI, 2002). ? Groundwater systems use an average

  9. Development of Cost-Competitive Advanced Thermoelectric Generators...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cost-Competitive Advanced Thermoelectric Generators for Direct Conversion of Vehicle Waste Heat into Useful Electrical Power Development of Cost-Competitive Advanced Thermoelectric...

  10. Audit Costs for the 1986 Texas Energy Cost Containment Program

    E-Print Network [OSTI]

    Heffington, W. M.; Lum, S. K.; Bauer, V. A.; Turner, W. D.

    1987-01-01T23:59:59.000Z

    Direct program costs for detailed audits of 13.5 million square feet of institutional building space in the 1986 Texas Energy Cost Containment Program were $0.047/SF. The building area was 63 percent simple (offices, schools, and universities...

  11. Directions in low-level radioactive waste management: A brief history of commercial low-level radioactive waste disposal

    SciTech Connect (OSTI)

    Not Available

    1990-10-01T23:59:59.000Z

    This report presents a history of commercial low-level radioactive waste management in the United States, with emphasis on the history of six commercially operated low-level radioactive waste disposal facilities. The report includes a brief description of important steps that have been taken during the 1980s to ensure the safe disposal of low-level waste in the 1990s and beyond. These steps include the issuance of Title 10 Code of Federal Regulations Part 61, Licensing Requirements for the Land Disposal of Radioactive Waste, the Low-Level Radioactive Waste Policy Act of 1980, the Low-Level Radioactive Waste Policy Amendments Act of 1985, and steps taken by states and regional compacts to establish additional disposal sites. 42 refs., 13 figs., 1 tab.

  12. Comparative Analysis of the Cost Models Used for Estimating Renovation Costs of Universities in Texas

    E-Print Network [OSTI]

    Faquih, Yaquta Fakhruddin

    2010-10-12T23:59:59.000Z

    Facility managers use various cost models and techniques to estimate the cost of renovating a building and to secure the required funds needed for building renovation. A literature search indicates that these techniques offer both advantages...

  13. Groundwater Management and the Cost of Reduced Surface Water Deliveries to Urban Areas: The Case of the Central and West Coast Basins of Southern California

    E-Print Network [OSTI]

    Sunding, David L.; Hamilton, Stephen F; Ajami, Newsha K

    2009-01-01T23:59:59.000Z

    Direct Use Desalter Water Residual Demand Source: Datathe basins. Residual demand for imported water, which is thefrom MWD. Residual demand for imported water represents the

  14. IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers

    E-Print Network [OSTI]

    Brown, Moya Melody, Camilla Dunham Whitehead, Rich

    2011-01-01T23:59:59.000Z

    Energy monitoring and process control systems are key tools in energy management and reduction. Metering systemsmanagement (monitoring) system to incorporate real-time data (e.g. , pressure, flow, system demand, and energy

  15. Types of Costs Types of Cost Estimates

    E-Print Network [OSTI]

    Boisvert, Jeff

    · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining% accuracy. ­ 2-5% of pre-production capital Types of Cost Estimates #12;3. Definitive ­ Based on definitive-even $ Production Level Fixed Cost Break-even $ Production Level Cost-Revenue Relationships · Capital Costs (or

  16. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01T23:59:59.000Z

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  17. 2014-2015 Projected Aviation Program Costs

    E-Print Network [OSTI]

    Delene, David J.

    2014-2015 Projected Aviation Program Costs UND Aerospace offers two aviation degree programs with a total of seven academic majors. Each has its own flight course requirements, which affect the cost of a degree program. BACHELOR of BUSINESS ADMINISTRATION ** Flight Costs Airport Management Survey of Flight

  18. Memorial University of Newfoundland Indirect Costs Report

    E-Print Network [OSTI]

    deYoung, Brad

    Memorial University of Newfoundland Indirect Costs Report 2012-13 The grant provided through the Government of Canada Indirect Costs Program (ICP) is essential to Memorial's research success. Funding and impact can be found in the following section. Total 2013 Indirect Costs Grant: $4,318,814 Management

  19. Energy efficiency improvement and cost saving opportunities for the Corn Wet Milling Industry: An ENERGY STAR Guide for Energy and Plant Managers

    SciTech Connect (OSTI)

    Galitsky, Christina; Worrell, Ernst; Ruth, Michael

    2003-07-01T23:59:59.000Z

    Corn wet milling is the most energy intensive industry within the food and kindred products group (SIC 20), using 15 percent of the energy in the entire food industry. After corn, energy is the second largest operating cost for corn wet millers in the United States. A typical corn wet milling plant in the United States spends approximately $20 to $30 million per year on energy, making energy efficiency improvement an important way to reduce costs and increase predictable earnings, especially in times of high energy-price volatility. This report shows energy efficiency opportunities available for wet corn millers. It begins with descriptions of the trends, structure and production of the corn wet milling industry and the energy used in the milling and refining process. Specific primary energy savings for each energy efficiency measure based on case studies of plants and references to technical literature are provided. If available, typical payback periods are also listed. The report draws upon the experiences of corn, wheat and other starch processing plants worldwide for energy efficiency measures. The findings suggest that given available resources and technology, there are opportunities to reduce energy consumption cost-effectively in the corn wet milling industry while maintaining the quality of the products manufactured. Further research on the economics of the measures, as well as the applicability of these to different wet milling practices, is needed to assess the feasibility of implementation of selected technologies at individual plants.

  20. Costing of Joining Methods -Arc Welding Costs

    E-Print Network [OSTI]

    Colton, Jonathan S.

    Costing of Joining Methods - Arc Welding Costs ver. 1 ME 6222: Manufacturing Processes and Systems Prof. J.S. Colton © GIT 2009 1 #12;OverviewOverview · Cost components · Estimation of costsEstimation of costs · Examples ME 6222: Manufacturing Processes and Systems Prof. J.S. Colton © GIT 2009 2 #12;Cost

  1. Types of Costs Types of Cost Estimates

    E-Print Network [OSTI]

    Boisvert, Jeff

    05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408-Revenue Relationships · Capital Costs (or first cost or capital investment): ­ Expenditures made to acquire or develop capital assets ­ Three main classes of capital costs: 1. Depreciable Investment: · Investment allocated

  2. Computer Methods International Corp. (CMiC) is a software Development firm specializing in enterprise financial and cost management systems designed for the

    E-Print Network [OSTI]

    Ellis, Randy

    Computer Methods International Corp. (CMiC) is a software Development firm specializing CMiC meets our overall SLA's in order to provide optimum maintenance and consistency across development · Provide guidance, support and reporting with other management members · Other related duties

  3. Records Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-02-03T23:59:59.000Z

    The Order sets forth requirements and responsibilities for implementing and maintaining a cost-effective records management program throughout the Department of Energy.

  4. Cost reduction performance enhancements of multiple site cooling water systems, enabled by remote system monitoring/control and multifaceted data management

    SciTech Connect (OSTI)

    Cook, B. [BetzDearborn Water Management Group, Horsham, PA (United States); Young, D. [BetzDearborn Water Management Group, Mississauga, Ontario (Canada); Tari, K. [Praxair, Inc., Tonawanda, New York, NY (United States)

    1998-12-31T23:59:59.000Z

    An outsourced cooling water treatment automated control and data acquisition package, has been designed, installed, and commissioned in over 70 sites in North America and offshore. The standard package consists of a controller, sensors, human-machine interface software, data acquisition and management software, communications, and reporting. Significant challenges to applying this standard package in multiple sites arose from variations in cooling system design and makeup water quality as well as operations, environmental considerations, metrics, and language. A standard approach has met these challenges and overcome effects of downsizing through significant reduction in non-value-added, manual activities. Overall system reliability has been improved by migration to best practice throughout the organizations involved and immediate proactive response to out-of-specification conditions. This paper documents the evolution of a standard cooling water automation and data management package from its inception to current practice.

  5. Estimating Specialty Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

  6. IT Project Manager

    Broader source: Energy.gov [DOE]

    This position is located in the IT Project Management Office (JP). A successful candidate in this position will serve as an IT Program Manager and technical expert responsible for directly managing...

  7. Cost Sharing What is Cost Sharing?

    E-Print Network [OSTI]

    Tsien, Roger Y.

    sharing using various data fields (bin, fund, PI, index, etc.) x Create a Bin Generate a bin where cost;3 Cost Sharing Steps Search for & Create a Bin Search Results Display Select AWARD Type the correct data1 Cost Sharing What is Cost Sharing? x Cost sharing is a commitment to use university resources

  8. Audit Costs for the 1986 Texas Energy Cost Containment Program 

    E-Print Network [OSTI]

    Heffington, W. M.; Lum, S. K.; Bauer, V. A.; Turner, W. D.

    1987-01-01T23:59:59.000Z

    Audit Costs for the 1986 Texas Energy Cost Containment Program W. M. Heffington, S. K. Lum, V. A. Bauer and W. D. Turner Energy Sys tems Group Mechanical Engineering Department Texas ALM University College Station, TX Direct program costs... Science Park of the University of Texas System Cancer Center is treated as one building as it was bv the audit- ing contractor. General Land Office records differ. by more than a factor of four on an area basi,s (Table 4). Figure 1 is a plot...

  9. Directives Tools

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Useful links and resources for Directives Writers, Directives Point of Contact (DPCs), Subject Matter Experts (SMEs), and Draft Directive Reviewers.

  10. Economic Costs & Adaptations for Alternative Delta Regulations: Appendix F

    E-Print Network [OSTI]

    Pasternack, Gregory B.

    Integrated water management: ­ Reservoir reoperation ­ Groundwater & conjunctive use ­ Water conservation conditions: Water deliveries and shortages Water scarcity costs Operating costs Mix of water management % Export Reduction %NoExportEconomicLoss #12;12 Ending Water Exports Water management adaptation Unfettered

  11. Cost objective PLM and CE

    E-Print Network [OSTI]

    Perry, Nicolas

    2010-01-01T23:59:59.000Z

    Concurrent engineering taking into account product life-cycle factors seems to be one of the industrial challenges of the next years. Cost estimation and management are two main strategic tasks that imply the possibility of managing costs at the earliest stages of product development. This is why it is indispensable to let people from economics and from industrial engineering collaborates in order to find the best solution for enterprise progress for economical factors mastering. The objective of this paper is to present who we try to adapt costing methods in a PLM and CE point of view to the new industrial context and configuration in order to give pertinent decision aid for product and process choices. A very important factor is related to cost management problems when developing new products. A case study is introduced that presents how product development actors have referenced elements to product life-cycle costs and impacts, how they have an idea bout economical indicators when taking decisions during t...

  12. Cost objective PLM and CE

    E-Print Network [OSTI]

    Nicolas Perry; Alain Bernard

    2010-11-26T23:59:59.000Z

    Concurrent engineering taking into account product life-cycle factors seems to be one of the industrial challenges of the next years. Cost estimation and management are two main strategic tasks that imply the possibility of managing costs at the earliest stages of product development. This is why it is indispensable to let people from economics and from industrial engineering collaborates in order to find the best solution for enterprise progress for economical factors mastering. The objective of this paper is to present who we try to adapt costing methods in a PLM and CE point of view to the new industrial context and configuration in order to give pertinent decision aid for product and process choices. A very important factor is related to cost management problems when developing new products. A case study is introduced that presents how product development actors have referenced elements to product life-cycle costs and impacts, how they have an idea bout economical indicators when taking decisions during the progression of the project of product development.

  13. INDIRECT COSTS OF RESEARCH University Policy No: FM5400

    E-Print Network [OSTI]

    Victoria, University of

    1 INDIRECT COSTS OF RESEARCH University Policy No: FM5400 Classification: Financial Management recoveries towards the indirect costs associated with externally funded Research conducted at the University Costs of Research include, but are not limited to those costs associated with: the operation

  14. NREL Sheds Light on Integration Costs of Variable Generation and

    E-Print Network [OSTI]

    , such as wind and solar energy, provide benefits such as reduced environmental impact, lack of fuel consumptionNREL Sheds Light on Integration Costs of Variable Generation and Cost-Causation Integration costs are generally manageable, but calculating costs is challenging. Renewable energy generation sources

  15. Employee Replacement Costs

    E-Print Network [OSTI]

    Dube, Arindrajit; Freeman, Eric; Reich, Michael

    2010-01-01T23:59:59.000Z

    Samuel Schenker, “The Costs of Hir- u ing Skilled Workers”,Employee Replacement Costs Arindrajit Dube, Eric Freeman andof employee replacement costs, using a panel survey of

  16. Employee Replacement Costs

    E-Print Network [OSTI]

    Dube, Arindrajit; Freeman, Eric; Reich, Michael

    2010-01-01T23:59:59.000Z

    Employee Replacement Costs Arindrajit Dube, Eric Freeman andproperties of employee replacement costs, using a panel2008. We establish that replacement costs are sub- stantial

  17. Novel Low Cost, High Reliability Wind Turbine Drivetrain

    SciTech Connect (OSTI)

    Anthony Chobot; Debarshi Das; Tyler Mayer; Zach Markey; Tim Martinson; Hayden Reeve; Paul Attridge; Tahany El-Wardany

    2012-09-13T23:59:59.000Z

    Clipper Windpower, in collaboration with United Technologies Research Center, the National Renewable Energy Laboratory, and Hamilton Sundstrand Corporation, developed a low-cost, deflection-compliant, reliable, and serviceable chain drive speed increaser. This chain and sprocket drivetrain design offers significant breakthroughs in the areas of cost and serviceability and addresses the key challenges of current geared and direct-drive systems. The use of gearboxes has proven to be challenging; the large torques and bending loads associated with use in large multi-MW wind applications have generally limited demonstrated lifetime to 8-10 years [1]. The large cost of gearbox replacement and the required use of large, expensive cranes can result in gearbox replacement costs on the order of $1M, representing a significant impact to overall cost of energy (COE). Direct-drive machines eliminate the gearbox, thereby targeting increased reliability and reduced life-cycle cost. However, the slow rotational speeds require very large and costly generators, which also typically have an undesirable dependence on expensive rare-earth magnet materials and large structural penalties for precise air gap control. The cost of rare-earth materials has increased 20X in the last 8 years representing a key risk to ever realizing the promised cost of energy reductions from direct-drive generators. A common challenge to both geared and direct drive architectures is a limited ability to manage input shaft deflections. The proposed Clipper drivetrain is deflection-compliant, insulating later drivetrain stages and generators from off-axis loads. The system is modular, allowing for all key parts to be removed and replaced without the use of a high capacity crane. Finally, the technology modularity allows for scalability and many possible drivetrain topologies. These benefits enable reductions in drivetrain capital cost by 10.0%, levelized replacement and O&M costs by 26.7%, and overall cost of energy by 10.2%. This design was achieved by: (1) performing an extensive optimization study that deter-mined the preliminary cost for all practical chain drive topologies to ensure the most competitive configuration; (2) conducting detailed analysis of chain dynamics, contact stresses, and wear and efficiency characteristics over the chain�������¢����������������s life to ensure accurate physics-based predictions of chain performance; and (3) developing a final product design, including reliability analysis, chain replacement procedures, and bearing and sprocket analysis. Definition of this final product configuration was used to develop refined cost of energy estimates. Finally, key system risks for the chain drive were defined and a comprehensive risk reduction plan was created for execution in Phase 2.

  18. Supplemental report on cost estimates'

    SciTech Connect (OSTI)

    NONE

    1992-04-29T23:59:59.000Z

    The Office of Management and Budget (OMB) and the U.S. Army Corps of Engineers have completed an analysis of the Department of Energy's (DOE) Fiscal Year (FY) 1993 budget request for its Environmental Restoration and Waste Management (ERWM) program. The results were presented to an interagency review group (IAG) of senior-Administration officials for their consideration in the budget process. This analysis included evaluations of the underlying legal requirements and cost estimates on which the ERWM budget request was based. The major conclusions are contained in a separate report entitled, ''Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program.'' This Corps supplemental report provides greater detail on the cost analysis.

  19. Controlling landfill closure costs

    SciTech Connect (OSTI)

    Millspaugh, M.P.; Ammerman, T.A. [Spectra Engineering, Latham, NY (United States)

    1995-05-01T23:59:59.000Z

    Landfill closure projects are significant undertakings typically costing well over $100,000/acre. Innovative designs, use of alternative grading and cover materials, and strong project management will substantially reduce the financial impact of a landfill closure project. This paper examines and evaluates the various elements of landfill closure projects and presents various measures which can be employed to reduce costs. Control measures evaluated include: the beneficial utilization of alternative materials such as coal ash, cement kiln dust, paper mill by-product, construction surplus soils, construction debris, and waste water treatment sludge; the appropriate application of Mandate Relief Variances to municipal landfill closures for reduced cover system requirements and reduced long-term post closure monitoring requirements; equivalent design opportunities; procurement of consulting and contractor services to maximize project value; long-term monitoring strategies; and grant loan programs. An analysis of closure costs under differing assumed closure designs based upon recently obtained bid data in New York State, is also provided as a means for presenting the potential savings which can be realized.

  20. Breaking the Fuel Cell Cost Barrier

    Broader source: Energy.gov (indexed) [DOE]

    Facilitated thermal management Enabler for price parity at volume with lead acid batteries and diesel generators PFM vs. PEM stack- Cost Analysis per kW at 103 unit volumes 6...

  1. The Americans with Disabilities Act Change Management

    E-Print Network [OSTI]

    Gering, Jon C.

    Cost Management Crisis Communication and Response Cybersecurity Disability Policy eLearning Educational and Instructional Technology Emergency Management Entrepreneurship "Green"Policy and Sustainability Financial

  2. Cost Analysis of Fuel Cell Systems for Transportation Compressed Hydrogen and PEM Fuel Cell System

    SciTech Connect (OSTI)

    Eric J. Carlson

    2004-10-20T23:59:59.000Z

    PEMFC technology for transportation must be competitive with internal combustion engine powertrains in a number of key metrics, including performance, life, reliability, and cost. Demonstration of PEMFC cost competitiveness has its own challenges because the technology has not been applied to high volume automotive markets. The key stack materials including membranes, electrodes, bipolar plates, and gas diffusion layers have not been produced in automotive volumes to the exacting quality requirements that will be needed for high stack yields and to the evolving property specifications of high performance automotive stacks. Additionally, balance-of-plant components for air, water, and thermal management are being developed to meet the unique requirements of fuel cell systems. To address the question of whether fuel cells will be cost competitive in automotive markets, the DOE has funded this project to assess the high volume production cost of PEM fuel cell systems. In this report a historical perspective of our efforts in assessment of PEMFC cost for DOE is provided along with a more in-depth assessment of the cost of compressed hydrogen storage is provided. Additionally, the hydrogen storage costs were incorporated into a system cost update for 2004. Assessment of cost involves understanding not only material and production costs, but also critical performance metrics, i.e., stack power density and associated catalyst loadings that scale the system components. We will discuss the factors influencing the selection of the system specification (i.e., efficiency, reformate versus direct hydrogen, and power output) and how these have evolved over time. The reported costs reflect internal estimates and feedback from component developers and the car companies. Uncertainty in the cost projection was addressed through sensitivity analyses.

  3. Network Management Network Management

    E-Print Network [OSTI]

    depending on ­ Equipment costs (CAPEX, Capital Expenditures) · Amortized over several years ­ Costs

  4. Multiperiod Portfolio Optimization with General Transaction Costs

    E-Print Network [OSTI]

    2013-07-17T23:59:59.000Z

    Department of Management Science and Operations, London Business School, ... For market impact costs, we show that the optimal portfolio policy at each ... Markowitz's analysis are that the investor only cares about single-period ... The case with a single-risky asset and proportional transaction costs is well understood.

  5. Energy Smart Guide to Campus Cost Savings: Executive Summary

    SciTech Connect (OSTI)

    Not Available

    2003-07-01T23:59:59.000Z

    Summary of The Energy Smart Guide to Campus Cost Savings, an energy efficiency guidebook for College and University business and facility managers.

  6. Guidelines for Engineering, Design, and Inspection Costs - DOE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, Guidelines for Engineering, Design, and Inspection Costs by John Makepeace Functional areas: Construction and Engineering, Project Management Engineering, design, and inspection...

  7. Cost Accounting System for fusion studies

    SciTech Connect (OSTI)

    Hamilton, W.R.; Keeton, D.C.; Thomson, S.L.

    1985-12-01T23:59:59.000Z

    A Cost Accounting System that is applicable to all magnetic fusion reactor design studies has been developed. This system provides: (1) definitions of the elements of cost and methods for the combination of these elements to form a cost estimate; (2) a Code of Accounts that uses a functional arrangement for identification of the plant components; and (3) definitions and methods to analyze actual cost data so that the data can be directly reported into this Cost Accounting System. The purpose of the Cost Accounting System is to provide the structure for the development of a fusion cost data base and for the development of validated cost estimating procedures. This system has been developed through use at the Fusion Engineering Design Center (FEDC) and has been applied to different confinement concepts (tokamaks and tandem mirrors) and to different types of projects (experimental devices and commercial power plants). The use of this Cost Accounting System by all magnetic fusion projects will promote the development of a common cost data base, allow the direct comparison of cost estimates, and ultimately establish the cost credibility of the program.

  8. CALIFORNIA STATE UNIVERSITY, RISK MANAGEMENT

    E-Print Network [OSTI]

    de Lijser, Peter

    CALIFORNIA STATE UNIVERSITY, FULLERTON RISK MANAGEMENT AND ENVIRONMENTAL HEALTH & INSTRUCTIONAL SAFETY 2009 ANNUAL REPORTS #12;2009 Annual Report Page 2 RISK MANAGEMENT I. Program Cost One method to assess the effectiveness of the University's risk management program is to compare the annual cost

  9. CALIFORNIA STATE UNIVERSITY, RISK MANAGEMENT

    E-Print Network [OSTI]

    de Lijser, Peter

    CALIFORNIA STATE UNIVERSITY, FULLERTON RISK MANAGEMENT 2010 ANNUAL REPORT #12;2010 Annual Report Page 2 I. Program Cost One method to assess the effectiveness of the University's risk management,538 $ 197,196 TOTAL Risk Management Costs $ 4,675,390 $ 4,541,975 $ 3,764,749 $ 3,703,959 $ 4

  10. University of Pittsburgh FINANCIAL GUIDELINE Subject: Allowability of Costs

    E-Print Network [OSTI]

    Sibille, Etienne

    University of Pittsburgh FINANCIAL GUIDELINE Subject: Allowability of Costs I. Scope This guideline establishes the requirements for determining the allowability of direct and indirect costs on the financial to ensure the allowability of the direct and indirect costs recorded on their sponsored projects

  11. Management issues in automated audit analysis

    SciTech Connect (OSTI)

    Jackson, K.A.; Hochberg, J.G.; Wilhelmy, S.K.; McClary, J.F.; Christoph, G.G.

    1994-03-01T23:59:59.000Z

    This paper discusses management issues associated with the design and implementation of an automated audit analysis system that we use to detect security events. It gives the viewpoint of a team directly responsible for developing and managing such a system. We use Los Alamos National Laboratory`s Network Anomaly Detection and Intrusion Reporter (NADIR) as a case in point. We examine issues encountered at Los Alamos, detail our solutions to them, and where appropriate suggest general solutions. After providing an introduction to NADIR, we explore four general management issues: cost-benefit questions, privacy considerations, legal issues, and system integrity. Our experiences are of general interest both to security professionals and to anyone who may wish to implement a similar system. While NADIR investigates security events, the methods used and the management issues are potentially applicable to a broad range of complex systems. These include those used to audit credit card transactions, medical care payments, and procurement systems.

  12. COST 4138/10 1 European Cooperation

    E-Print Network [OSTI]

    : Pathway Evaluation and pest Risk Management In Transport - PERMIT Delegations will find attached AND PEST RISK MANAGEMENT IN TRANSPORT - PERMIT The Parties to this Memorandum of Understanding, declaring. The COST Action PERMIT addresses this shortfall in knowledge and practice and will focus on reducing

  13. Procedures for Unallowable Costs A list of costs that are considered "unallowable" for federal reimbursement is contained within OMB Circular A-21

    E-Print Network [OSTI]

    Lawrence, Rick L.

    Procedures for Unallowable Costs A list of costs that are considered "unallowable" for federal reimbursement is contained within OMB Circular A-21 (Principles for Determining Costs Applicable to Grants of the proposed costs is conducted by the OSP Fiscal Manager to ensure that no unallowable costs are requested

  14. Depleted uranium management alternatives

    SciTech Connect (OSTI)

    Hertzler, T.J.; Nishimoto, D.D.

    1994-08-01T23:59:59.000Z

    This report evaluates two management alternatives for Department of Energy depleted uranium: continued storage as uranium hexafluoride, and conversion to uranium metal and fabrication to shielding for spent nuclear fuel containers. The results will be used to compare the costs with other alternatives, such as disposal. Cost estimates for the continued storage alternative are based on a life-cycle of 27 years through the year 2020. Cost estimates for the recycle alternative are based on existing conversion process costs and Capital costs for fabricating the containers. Additionally, the recycle alternative accounts for costs associated with intermediate product resale and secondary waste disposal for materials generated during the conversion process.

  15. Managing Overloaded Hosts for Dynamic Consolidation of Virtual Machines in Cloud Data

    E-Print Network [OSTI]

    Melbourne, University of

    maintenance costs, or imple- ment a private cloud data center to improve the resource management of virtual machines (VMs) is an effective way to improve the utilization of resources and energy efficiency of dynamic VM consolidation that directly influences the resource utilization and quality of service (Qo

  16. Evaporative Roof Cooling- A Simple Solution to Cut Cooling Costs

    E-Print Network [OSTI]

    Abernethy, D.

    Since the “Energy Crisis” Evaporative Roof Cooling Systems have gained increased acceptance as a cost effective method to reduce the high cost of air conditioning. Documented case histories in retro-fit installations show direct energy savings...

  17. SOM ARRA Grant Activity Proposals Submitted as of 7-15-2010 Project Costs*

    E-Print Network [OSTI]

    Bushman, Frederic

    SOM ARRA Grant Activity Proposals Submitted as of 7-15-2010 Project Costs* Total # of Proposals 1,264 Total Project Costs $1,093,036,719 Total Direct Costs $803,739,425 Total Indirects $290,408,131 Awards Received as of 2-11-2011 Project Costs* Year 1 Costs Total # of Awards 333 Total Project Costs $186

  18. Cost Model and Cost Estimating Software

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

  19. FY 1997 cost savings report

    SciTech Connect (OSTI)

    Sellards, J.B.

    1998-06-01T23:59:59.000Z

    With the end of the cold war, funding for the Environmental Management program increased rapidly as nuclear weapons production facilities were shut down, cleanup responsibilities increased, and facilities were transferred to the cleanup program. As funding for the Environmental Management (EM) program began to level off in response to Administration and Congressional efforts to balance the Federal budget, the program redoubled its efforts to increase efficiency and get more productivity out of every dollar. Cost savings and enhanced performance are an integral pair of Hanford Site operations. FY1997 was the third year of a cost savings program that was initially defined in FY 1995. The definitions and process remained virtually the same as those used in FY 1996.

  20. Load Management for Industry

    E-Print Network [OSTI]

    Konsevick, W. J., Jr.

    1982-01-01T23:59:59.000Z

    customer management programs exist. EPRI Report (EM-1606) loads to beneficially alter a'utility's load curve. (Page 1-2) list them as: Load management alternatives are covered. 1. Direct or voluntary control of customer Load management methods can... and Electric Power Research Institute (EPRI) Report energy management programs. (EM-1606) states that "the objective of load manage ment is to alter the real or apparent pattern of Our load management program was designed electricity use in order to...

  1. Pollution prevention cost savings potential

    SciTech Connect (OSTI)

    Celeste, J.

    1994-12-01T23:59:59.000Z

    The waste generated by DOE facilities is a serious problem that significantly impacts current operations, increases future waste management costs, and creates future environmental liabilities. Pollution Prevention (P2) emphasizes source reduction through improved manufacturing and process control technologies. This concept must be incorporated into DOE`s overall operating philosophy and should be an integral part of Total Quality Management (TQM) program. P2 reduces the amount of waste generated, the cost of environmental compliance and future liabilities, waste treatment, and transportation and disposal costs. To be effective, P2 must contribute to the bottom fine in reducing the cost of work performed. P2 activities at LLNL include: researching and developing innovative manufacturing; evaluating new technologies, products, and chemistries; using alternative cleaning and sensor technologies; performing Pollution Prevention Opportunity Assessments (PPOAs); and developing outreach programs with small business. Examples of industrial outreach are: innovative electroplating operations, printed circuit board manufacturing, and painting operations. LLNL can provide the infrastructure and technical expertise to address a wide variety of industrial concerns.

  2. Activity Based Costing

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

  3. 0 Taxonomy and Costing Method for Security Services Toward a Taxonomy and Costing Method for

    E-Print Network [OSTI]

    Irvine, Cynthia E.

    0 Taxonomy and Costing Method for Security Services Toward a Taxonomy and Costing Method to manage, a preliminary security service taxonomy is defined. The taxonomy is used a s framework a preliminary taxonomy of security services, and to show how this taxonomy can be used as the foundation

  4. Network Management Network Management

    E-Print Network [OSTI]

    : is it important? · Cost are essentially depending on ­ Equipment costs (CAPEX, Capital Expenditures) · Amortized

  5. Environmental management activities

    SciTech Connect (OSTI)

    NONE

    1997-07-01T23:59:59.000Z

    The Office of Environmental Management (EM) has been delegated the responsibility for the Department of Energy`s (DOE`s) cleanup of the nuclear weapons complex. The nature and magnitude of the waste management and environmental remediation problem requires the identification of technologies and scientific expertise from domestic and foreign sources. Within the United States, operational DOE facilities, as well as the decontamination and decommissioning of inactive facilities, have produced significant amounts of radioactive, hazardous, and mixed wastes. In order to ensure worker safety and the protection of the public, DOE must: (1) assess, remediate, and monitor sites and facilities; (2) store, treat, and dispose of wastes from past and current operations; and (3) develop and implement innovative technologies for environmental restoration and waste management. The EM directive necessitates looking beyond domestic capabilities to technological solutions found outside US borders. Following the collapse of the Soviet regime, formerly restricted elite Soviet scientific expertise became available to the West. EM has established a cooperative technology development program with Russian scientific institutes that meets domestic cleanup objectives by: (1) identifying and accessing Russian EM-related technologies, thereby leveraging investments and providing cost-savings; (2) improving access to technical information, scientific expertise, and technologies applicable to EM needs; and (3) increasing US private sector opportunities in Russian in EM-related areas.

  6. Sharing Supermodular Costs

    E-Print Network [OSTI]

    2010-06-23T23:59:59.000Z

    For a particular class of supermodular cost cooperative games that arises from a scheduling ... the costs collectively incurred by a group of cooperating agents.

  7. Operations Cost Allocation Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms...

  8. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03T23:59:59.000Z

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

  9. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03T23:59:59.000Z

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

  10. Annex 2 Risk Management Guidance and Template SPO Project Management

    E-Print Network [OSTI]

    1 Annex 2 ­ Risk Management Guidance and Template SPO Project Management Guidance on Risk Management Introduction Risk is any action or event that affects a project's ability to achieve its on cost, schedule and technical performance. However, with appropriate procedures, risks can be managed

  11. Calculating Costs for Quality of Security Service Evdoxia Spyropoulou

    E-Print Network [OSTI]

    utilization costs. The estimated costs can be fed into a resource management system to facilitate the process the design of the QoSS costing demonstration, which we believe is suitable for incorporation into a resource resource availability. As part of the process of estimating efficient task schedules, the RMS must balance

  12. Whole Life Cycle Costs: a new approach Pierre Mvellec*, Nicolas Perry**

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 Whole Life Cycle Costs: a new approach Pierre Mévellec*, Nicolas Perry** * IAE, University in the concepts, methods and general approach to calculating costs. ABC, Target Costing, Strategic Cost Management, functional analysis and costing are mobilising attention. Regardless of which of these approaches we consider

  13. Types of Cost Estimates

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    The chapter describes the estimates required on government-managed projects for both general construction and environmental management.

  14. Impacts of motor vehicle operation on water quality - Clean-up Costs and Policies

    E-Print Network [OSTI]

    Nixon, Hilary; Saphores, Jean-Daniel M

    2007-01-01T23:59:59.000Z

    Inc. (2001). Cost survey – Stormwater management facilities,of state fund survey results. Waste Management Division.Survey and focus groups DIYers and used oil disposal initial results and recommendations. California Integrated Waste Management

  15. Brush Busters: How to Estimate Costs for Controlling Pricklypear

    E-Print Network [OSTI]

    Ueckert, Darrell; McGinty, Allan

    1999-04-15T23:59:59.000Z

    Simple directions help you determine the density of pricklypear on your land, and then estimate the cost of controlling these plants with the pad or stem spray method....

  16. Measuring the Costs and Economic, Social, and Environmental Benefits...

    Broader source: Energy.gov (indexed) [DOE]

    the Costs and Economic, Social, and Environmental Benefits of Nationwide Geothermal Heat Pump Deployment and The Potential Employment, Energy, and Environmental Impacts of Direct...

  17. CALIFORNIA STATE UNIVERSITY, RISK MANAGEMENT

    E-Print Network [OSTI]

    de Lijser, Peter

    CALIFORNIA STATE UNIVERSITY, FULLERTON RISK MANAGEMENT ANNUAL REPORT January 2008 OFFICE OF UNIVERSITY RISK MANAGEMENT CP-320 714-278-7346 #12;2006 ­ 2007 Risk Management Annual Report Page 2 I. Executive Summary A. Program Cost One method to assess the effectiveness of the University's risk management

  18. CALIFORNIA STATE UNIVERSITY, RISK MANAGEMENT

    E-Print Network [OSTI]

    de Lijser, Peter

    CALIFORNIA STATE UNIVERSITY, FULLERTON RISK MANAGEMENT ANNUAL REPORT November 2006 OFFICE OF UNIVERSITY RISK MANAGEMENT LH-806C 714-278-7346 #12;2005 ­ 2006 Risk Management Annual Report Page 2 I. Executive Summary A. Program Cost One method to assess the effectiveness of the University's risk management

  19. International Commitments Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-11-18T23:59:59.000Z

    This Order establishes a process to manage the Department's International Commitments under the administrative direction of the Office of Policy and International Affairs. No cancellation.

  20. ORISE: Emergency Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    provided direction and experienced leadership to the Federal Bureau of Investigation's (FBI) Crisis Management Unit to establish a standardized exercise program for the FBI that...

  1. Parallel integrated thermal management

    DOE Patents [OSTI]

    Bennion, Kevin; Thornton, Matthew

    2014-08-19T23:59:59.000Z

    Embodiments discussed herein are directed to managing the heat content of two vehicle subsystems through a single coolant loop having parallel branches for each subsystem.

  2. A scoping study on the costs of indoor air quality illnesses:an insurance loss reduction perspective

    SciTech Connect (OSTI)

    Chen, Allan; Vine, Edward L.

    1998-08-31T23:59:59.000Z

    The incidence of commercial buildings with poor indoor air quality (IAQ), and the frequency of litigation over the effects of poor IAQ is increasing. If so, these increases have ramifications for insurance carriers, which pay for many of the costs of health care and general commercial liability. However, little is known about the actual costs to insurance companies from poor IAQ in buildings. This paper reports on the results of a literature search of buildings-related, business and legal databases, and interviews with insurance and risk management representatives aimed at finding information on the direct costs to the insurance industry of poor building IAQ, as well as the costs of litigation. The literature search and discussions with insurance and risk management professionals reported in this paper turned up little specific information about the costs of IAQ-related problems to insurance companies. However, those discussions and certain articles in the insurance industry press indicate that there is a strong awareness and growing concern over the "silent crisis" of IAQ and its potential to cause large industry losses, and that a few companies are taking steps to address this issue. The source of these losses include both direct costs to insurers from paying health insurance and professional liability claims, as weIl as the cost of litigation. In spite of the lack of data on how IAQ-related health problems affect their business, the insurance industry has taken the anecdotal evidence about their reality seriously enough to alter their policies in ways that have lessened their exposure. We conclude by briefly discussing four activities that need to be addressed in the near future: (1) quantifying IAQ-related insurance costs by sector, (2) educating the insurance industry about the importance of IAQ issues, (3) examining IAQ impacts on the insurance industry in the residential sector, and (4) evaluating the relationship between IAQ improvements and their impact on energy use.

  3. Directives Templates - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDieselDirections Both theDirectives Review

  4. Cost Estimation Package

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

  5. Systems Engineering Cost Estimation

    E-Print Network [OSTI]

    Bryson, Joanna J.

    on project, human capital impact. 7 How to estimate Cost? Difficult to know what we are building early on1 Systems Engineering Lecture 3 Cost Estimation Dr. Joanna Bryson Dr. Leon Watts University of Bath: Contrast approaches for estimating software project cost, and identify the main sources of cost

  6. Life Cycle Cost Estimate

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

  7. Resources for Fleet Managers

    Broader source: Energy.gov [DOE]

    Fleet managers will benefit from the lower fuel costs, more reliable fuel prices, and lower emissions that come from using alternative fuels and advanced technologies made possible through the work...

  8. Preparing Los Alamos National Laboratory's Waste Management Program for the Future - 12175

    SciTech Connect (OSTI)

    Jones, Scotty W.; Dorries, Alison M.; Singledecker, Steven [Los Alamos National Laboratory, PO Box 1663, Los Alamos, NM 87545 (United States); Henckel, George [Los Alamos Site Office, MS-A316, Los Alamos, NM 87544 (United States)

    2012-07-01T23:59:59.000Z

    The waste management program at Los Alamos National Laboratory (LANL) is undergoing significant transition to establish a lean highly functioning waste management program that will succeed the large environmental cleanup waste management program. In the coming years, the environmental cleanup activities will be mostly completed and the effort will change to long-term stewardship. What will remain in waste management is a smaller program focused on direct off-site shipping to cost-effectively enable the enduring mission of the laboratory in support of the national nuclear weapons program and fundamental science and research. It is essential that LANL implement a highly functioning efficient waste management program in support of the core missions of the national weapons program and fundamental science and research - and LANL is well on the way to that goal. As LANL continues the transition process, the following concepts have been validated: - Business drivers including the loss of onsite disposal access and completion of major environmental cleanup activities will drive large changes in waste management strategies and program. - A well conceived organizational structure; formal management systems; a customer service attitude; and enthusiastic managers are core to a successful waste management program. - During times of organizational transition, a project management approach to managing change in a complex work place with numerous complex deliverables is successful strategy. - Early and effective engagement with waste generators, especially Project Managers, is critical to successful waste planning. - A well-trained flexible waste management work force is vital. Training plans should include continuous training as a strategy. - A shared fate approach to managing institutional waste decisions, such as the LANL Waste Management Recharge Board is effective. - An efficient WM program benefits greatly from modern technology and innovation in managing waste data and reports. - Use of six-sigma tools can help improve the quality and efficiency of waste management processes. - A fair, easy to understand, transparent, and well-overseen process for distributing the cost of waste disposal and waste program oversight is essential. (authors)

  9. OOTW COST TOOLS

    SciTech Connect (OSTI)

    HARTLEY, D.S.III; PACKARD, S.L.

    1998-09-01T23:59:59.000Z

    This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

  10. Hydrogen refueling station costs in Shanghai

    E-Print Network [OSTI]

    Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

    2007-01-01T23:59:59.000Z

    Elec Del Cali: Del Investment Cost Delivery Cost OperatingCost Feedstock Cost Investment Cost Delivery Cost Operatingcosts Annualized investment cost, 1000$/yr Total annualized

  11. Re-thinking incentives and penalties: Economic aspects of waste management in Italy

    SciTech Connect (OSTI)

    Cossu, R. [IMAGE, Department of Hydraulic, Maritime, Environmental and Geotechnical Engineering, University of Padua, Via Loredan, 35131 Padua (Italy); Masi, S., E-mail: salvatore.masi@unibas.it [DIFA, Department of Environmental Engineering and Physics, University of Basilicata, Via dell’Ateneo 10, 85100 Potenza (Italy)

    2013-11-15T23:59:59.000Z

    Highlights: • We focused on the dynamics the formation of operational costs of waste management. • We provide the basic elements to compose a picture of economic management. • We present a reflection on the last hidden costs associated with the consumption of goods and packaging. • Reduction of waste production. - Abstract: This paper focuses on the dynamics the formation of operational costs of waste management in Italy and the effect of economic measures. Currently incentives and penalties have been internalized by the system no differently from other cost items and revenues. This has greatly influenced the system directing it towards solutions that are often distant from the real environmental objectives. Based on an analysis of disaggregated costs of collection treatment and recovery, we provide the basic elements to compose a picture of economic management in various technical–organizational scenarios. In the light of the considerations contained in the paper it is proposed, e.g. for controlled landfills, that the ecotax, currently based on weight, could be replaced by one based on the volume consumption. Likewise, for tax reduction on disposal system, instead a pre-treatment might ask an environmental balance of the overall system. The article presents a reflection on the last hidden costs associated with the consumption of goods and packaging, and how to reduce waste production is the necessary path to be followed in ecological and economic perspectives.

  12. Increase Productivity - Implement Energy Management Systems with Project Management Techniques

    E-Print Network [OSTI]

    Spinner, M. P.

    1984-01-01T23:59:59.000Z

    Engineering Manager of this small but active division, I devote a big part of my time on justifying energy expenditures and the means to reduce these costs. Ten years ago energy costs were one tenth of today's costs and just about three percent of the division...

  13. EIS-0200: Managing Treatment, Storage, and Disposal of Radioactive...

    Broader source: Energy.gov (indexed) [DOE]

    EIS evaluates the potential environmental and cost impacts of strategic managment alternatives for managing five types of radioactive and hazardous wastes that have resulted and...

  14. Example of Environmental Restoration Code of Accounts - DOE Directives...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    describes the Level 1 cost codes, and lists the Level 2 and Level 3 cost codes. g4301-1chp17.pdf -- PDF Document, 12 KB Writer: John Makepeace Subjects: Administration Management...

  15. 1998 Environmental Management Science Program Annual Report

    SciTech Connect (OSTI)

    None

    1999-03-01T23:59:59.000Z

    The Environmental Management Science Program (EMSP) is a collaborative partnership between the DOE Office of Environmental Management (EM), Office of Science (DOE-SC), and the Idaho Operations Office (DOE-ID) to sponsor basic environmental and waste management related research. Results are expected to lead to reduction of the costs, schedule, and risks associated with cleaning up the nation's nuclear complex. The EMSP research portfolio addresses the most challenging technical problems of the EM program related to high level waste, spent nuclear fuel, mixed waste, nuclear materials, remedial action, decontamination and decommissioning, and health, ecology, or risk. The EMSP was established in response to a mandate from Congress in the fiscal year 1996 Energy and Water Development Appropriations Act. Congress directed the Department to ''provide sufficient attention and resources to longer-term basic science research which needs to be done to ultimately reduce cleanup costs, develop a program that takes advantage of laboratory and university expertise, and seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective''. This mandate followed similar recommendations from the Galvin Commission to the Secretary of Energy Advisory Board. The EMSP also responds to needs identified by National Academy of Sciences experts, regulators, citizen advisory groups, and other stakeholders.

  16. Report on the Savannah River Site aluminum-based spent nuclear fuel alternatives cost study

    SciTech Connect (OSTI)

    NONE

    1998-12-01T23:59:59.000Z

    Initial estimates of costs for the interim management and disposal of aluminum-based spent nuclear fuel (SNF) were developed during preparation of the Environmental Impact Statement (EIS) on the Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel. The Task Team evaluated multiple alternatives, assessing programmatic, technical, and schedule risks, and generated life-cycle cost projections for each alternative. The eight technology alternatives evaluated were: direct co-disposal; melt and dilute; reprocessing; press and dilute; glass material oxidation dissolution system (GMODS); electrometallurgical treatment; dissolve and vitrify; and plasma arc. In followup to the Business Plan that was developed to look at SNF dry storage, WSRC prepared an addendum to the cost study. This addendum estimated the costs for the modification and use of an existing (105L) reactor facility versus a greenfield approach for new facilities (for the Direct Co-Disposal and Melt and Dilute alternatives). WSRC assessed the impacts of a delay in reprocessing due to the potential reservation of H-Canyon for other missions (i.e., down blending HEU for commercial use or the conversion of plutonium to either MOX fuel or an immobilized repository disposal form). This report presents the relevant results from these WSRC cost studies, consistent with the most recent project policy, technology implementation, canyon utilization, and inventory assumptions. As this is a summary report, detailed information on the technical alternatives or the cost assumptions raised in each of the above-mentioned cost studies is not provided. A comparison table that briefly describes the bases used for the WSRC analyses is included as Appendix A.

  17. The Economic Costs of Childhood Disability VOL. 22 / NO. 1 / SPRING 2012 65

    E-Print Network [OSTI]

    Rowley, Clarence W.

    The Economic Costs of Childhood Disability VOL. 22 / NO. 1 / SPRING 2012 65 The Economic Costs and long-term economic costs that have important implications for the well-being of the child, the family examine evidence about three kinds of costs--direct, out-of-pocket costs incurred as a result of the child

  18. Draft Fourth Northwest Conservation and Electric Power Plan, Appendix I ENVIRONMENTAL COST METHODOLOGY

    E-Print Network [OSTI]

    I-1 Draft Fourth Northwest Conservation and Electric Power Plan, Appendix I APPENDIX I ENVIRONMENTAL COST METHODOLOGY METHOD FOR DETERMINING QUANTIFIABLE ENVIRONMENTAL COSTS AND BENEFITS Priority or measure is cost-effective. Quantifiable environmental costs and benefits are among the direct costs

  19. Smart Energy Management of Multiple Full Cell Powered Applications

    SciTech Connect (OSTI)

    MOhammad S. Alam

    2007-04-23T23:59:59.000Z

    In this research project the University of South Alabama research team has been investigating smart energy management and control of multiple fuel cell power sources when subjected to varying demands of electrical and thermal loads together with demands of hydrogen production. This research has focused on finding the optimal schedule of the multiple fuel cell power plants in terms of electric, thermal and hydrogen energy. The optimal schedule is expected to yield the lowest operating cost. Our team is also investigating the possibility of generating hydrogen using photoelectrochemical (PEC) solar cells through finding materials for efficient light harvesting photoanodes. The goal is to develop an efficient and cost effective PEC solar cell system for direct electrolysis of water. In addition, models for hydrogen production, purification, and storage will be developed. The results obtained and the data collected will be then used to develop a smart energy management algorithm whose function is to maximize energy conservation within a managed set of appliances, thereby lowering O/M costs of the Fuel Cell power plant (FCPP), and allowing more hydrogen generation opportunities. The Smart Energy Management and Control (SEMaC) software, developed earlier, controls electrical loads in an individual home to achieve load management objectives such that the total power consumption of a typical residential home remains below the available power generated from a fuel cell. In this project, the research team will leverage the SEMaC algorithm developed earlier to create a neighborhood level control system.

  20. Managing Critical Management Improvement Initiatives

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-10-01T23:59:59.000Z

    Provides requirements and responsibilities for planning, executing and assessing critical management improvement initiatives within DOE. DOE N 251.59, dated 9/27/2004, extends this Notice until 10/01/2005. Archived 11-8-10. Does not cancel other directives.

  1. About Cost Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    from the university, fee-for-service contracts, as well as establishing CAMD as a cost center. We know that our users are reluctant to see CAMD become a cost center, however...

  2. IRO INTERNAL MANAGEMENT Funded by the

    E-Print Network [OSTI]

    Management · OGPI approach · Information and Management Systems #12;· The analysis will be focus "tools" that improve the quality of the costs management: The Economic Management Tool (IntranetIRO INTERNAL MANAGEMENT - UA - Funded by the European Union 3rd Workshop: IROs Models Tunisia, 30

  3. Thermal management in heavy vehicles : a review identifying issues and research requirements.

    SciTech Connect (OSTI)

    Wambsganss, M. W.

    1999-01-15T23:59:59.000Z

    Thermal management in heavy vehicles is cross-cutting because it directly or indirectly affects engine performance, fuel economy, safety and reliability, engine/component life, driver comfort, materials selection, emissions, maintenance, and aerodynamics. It follows that thermal management is critical to the design of large (class 6-8) trucks, especially in optimizing for energy efficiency and emissions reduction. Heat rejection requirements are expected to increase, and it is industry's goal to develop new, innovative, high-performance cooling systems that occupy less space and are lightweight and cost-competitive. The state of the art in heavy vehicle thermal management is reviewed, and issues and research areas are identified.

  4. Power Plant Cycling Costs

    SciTech Connect (OSTI)

    Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

    2012-07-01T23:59:59.000Z

    This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

  5. Management Plan Management Plan

    E-Print Network [OSTI]

    Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have communities" J. Lichatowich et al. 1998. A Conceptual Foundation for the Management of Native Salmonids

  6. Project Controls - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    description of project controls and the role the cost estimation package plays. g4301-1chp14.pdf -- PDF Document, 6 KB Writer: John Makepeace Subjects: Administration Management...

  7. Energy and Demand Savings from Implementation Costs in Industrial Facilities

    E-Print Network [OSTI]

    Razinha, J. A.; Heffington, W. M.

    1 ENERGY AND DEMAND SAVINGS FROM IMPLEMENTATION COSTS IN INDUSTRIAL FACILITIES 1 Razinha, J.A. and Heffington, W.M. Industrial Assessment Center and Mechanical Engineering Department Texas A&M University, College Station, Texas 77843.... noted that a direct calculation of cost savings from the implementation cost could eliminate as much as 30% of the preparation time (and associated cost) for the LoanSTAR reports. The savings result from not having to calculate energy or demand...

  8. Directives Quarterly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDieselDirections Both the Fermilab Management's

  9. Cost Model for Digital Curation: Cost of Digital Migration

    E-Print Network [OSTI]

    Kejser, Ulla Břgvad; Nielsen, Anders Bo; Thirifays, Alex

    2009-01-01T23:59:59.000Z

    notes that comparisons of cost data remain difficult becausethese resources into cost data, and a description of themigrations), the cost of processing the data may rise

  10. Hydrogen Refueling Station Costs in Shanghai

    E-Print Network [OSTI]

    Weinert, Jonathan X.; Shaojun, Liu; Ogden, J; Jianxin, Ma

    2006-01-01T23:59:59.000Z

    Costs Annualized Investment Cost, 1000$/yr Total AnnualizedH2 Fueling Stations Investment Cost Cost ($/yr) OperatingH2 Fueling Stations Investment Cost Cost ($/kg) Operating

  11. Organizing and Managing for Energy Productivity

    E-Print Network [OSTI]

    Sipple, P. A.

    1984-01-01T23:59:59.000Z

    In my company the energy management function is charged with: 1. assuring adequate and reliable supply at lowest reasonable cost, 2. forecasting and planning needs and projecting costs for existing and new facilities, 3. coordinating companywide...

  12. Organizing and Managing for Energy Productivity 

    E-Print Network [OSTI]

    Sipple, P. A.

    1984-01-01T23:59:59.000Z

    In my company the energy management function is charged with: 1. assuring adequate and reliable supply at lowest reasonable cost, 2. forecasting and planning needs and projecting costs for existing and new facilities, 3. coordinating companywide...

  13. IM-GEO: Impact of R and D on cost of geothermal power: Documentation of Model Version 2. 09

    SciTech Connect (OSTI)

    Petty, S.; Entingh, D.; Livesay, B.J.

    1988-02-01T23:59:59.000Z

    IM-GEO is an analysis used to estimate the impact of technology improvements on the relative cost of hydrothermal power. The analysis is available in a tutorial program for use on personal computers. It is designed for use by R and D program managers to evaluate R and D options. Only the potential impact of technologies is considered with all economic factors being held constant. This analysis has one unique feature. The economic impact of reducing risk by improving reservoir characterization is included using a strategy currently employed by financial institutions. This report describes the basis of the calculations, documents the code, and describes the operational procedures. Application of the code to study potential cost reductions due to R and D success will be done by R and D managers to evaluate and direct their own programs.

  14. Directives System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-01-30T23:59:59.000Z

    The Department of Energy (DOE) Directives System is the means by which DOE policies, requirements, and responsibilities are developed and communicated throughout the Department. Directives are used to inform, direct, and guide employees in the performance of their jobs, and to enable employees to work effectively within the Department and with agencies, contractors, and the public. Cancels: DOE O 251.1, DOE M 251.1-1

  15. Cost-and Energy-Aware Load Distribution Across Data Centers

    E-Print Network [OSTI]

    Cost- and Energy-Aware Load Distribution Across Data Centers Kien T. Le Ricardo Bianchini Margaret a framework to manage energy and cost Determine a request distribution across data centers Minimize cost while OverallCost = periods of day, data centers DCCost DCCost = Base Energy + Dynamic Energy Assume Load

  16. What`s new in federal energy management: FEMP program overview. Federal Energy Management Program

    SciTech Connect (OSTI)

    NONE

    1996-08-01T23:59:59.000Z

    The US government has an enormous cost-saving opportunity as the largest energy user in the world. In 1994, the government spent $8 billion for its 500,000 buildings, it vehicles, and process energy. The US Department of Energy (DOE), Federal Energy Management Program (FEMP) reduces the cost of government and makes it work better through energy efficiency, use of renewable energy, and water conservation. FEMP leads Federal energy efficiency efforts and helps Federal energy managers identify and procure the best, most cost-effective energy-saving projects. It does this through proactive problem solving; an aggressive emphasis on increasing the number and quality of projects; and effective partnerships among agencies, utilities, the private sector, and states. Partnerships lead to increased motivation and education and reduced barriers to successful procurement. As the lead organization implementing legislation and Presidential direction for Federal energy efficiency, FEMP administers an interagency energy committee and task force and collaborates with the DOE national energy laboratories. FEMP works with energy service companies, energy savings product manufacturers, and utilities. This partnership will lead to a $1 billion investment by companies willing to invest in return for a share of the energy cost savings. With FEMP project financing, audits, training and technical assistance, and new technology demonstrations, agencies overcome obstacles to achieving widespread energy efficiency.

  17. Cost Estimating Handbook for Environmental Restoration

    SciTech Connect (OSTI)

    NONE

    1990-09-01T23:59:59.000Z

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

  18. Facilities and Administration (Indirect) Costs Rates Facilities and Administrative (indirect) costs rates are the result of negotiations with the U.S.

    E-Print Network [OSTI]

    Saldin, Dilano

    Facilities and Administration (Indirect) Costs Rates Facilities and Administrative (indirect) costs (Indirect Costs) Source of Funds Applicable To F&A Rate DHHS Federally Negotiated Rates: Federal, Non or a different rate has been approved by the Director of OSP. *MTDC Base: Modified total direct costs consist

  19. Lockheed Martin Idaho Technologies Company information management technology architecture

    SciTech Connect (OSTI)

    Hughes, M.J.; Lau, P.K.S.

    1996-05-01T23:59:59.000Z

    The Information Management Technology Architecture (TA) is being driven by the business objectives of reducing costs and improving effectiveness. The strategy is to reduce the cost of computing through standardization. The Lockheed Martin Idaho Technologies Company (LMITCO) TA is a set of standards and products for use at the Idaho National Engineering Laboratory (INEL). The TA will provide direction for information management resource acquisitions, development of information systems, formulation of plans, and resolution of issues involving LMITCO computing resources. Exceptions to the preferred products may be granted by the Information Management Executive Council (IMEC). Certain implementation and deployment strategies are inherent in the design and structure of LMITCO TA. These include: migration from centralized toward distributed computing; deployment of the networks, servers, and other information technology infrastructure components necessary for a more integrated information technology support environment; increased emphasis on standards to make it easier to link systems and to share information; and improved use of the company`s investment in desktop computing resources. The intent is for the LMITCO TA to be a living document constantly being reviewed to take advantage of industry directions to reduce costs while balancing technological diversity with business flexibility.

  20. Report of the Finance Cost Reduction Working Group to the Federal ESPC Steering Committee

    E-Print Network [OSTI]

    Oak Ridge National Laboratory

    Report of the Finance Cost Reduction Working Group to the Federal ESPC Steering Committee Reducing Financing Costs for Federal ESPCs Federal Energy Management Program Energy Savings Performance Contracting 2. REQUIREMENTS FOR COMPETITIVE FINANCING ACQUISITION .................................7 2.1 Use

  1. Directives - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDieselDirections Both the Fermilab box

  2. Directives Quarterly Updates - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDieselDirections Both the

  3. Benefit-cost assessment of aviation environmental policies

    E-Print Network [OSTI]

    Gilmore, Christopher K. (Christopher Kenneth)

    2012-01-01T23:59:59.000Z

    This thesis aids in the development of a framework in which to conduct global benefit-cost assessments of aviation policies. Current policy analysis tools, such as the aviation environmental portfolio management tool (APMT), ...

  4. Minimum concave cost flows in capacitated grid networks

    E-Print Network [OSTI]

    2014-03-31T23:59:59.000Z

    The motivation to study CFG stems from applications in production planning, sup- ply chain management, maritime transportation, and reverse logistics. ... cific network topology or cost functions (see [10] and [9] for a survey of recent results).

  5. Cost | OpenEI Community

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovationinConcentratingEnergyCoosa ValleyCorsicanaproject (SmartCost Home

  6. Breckinridge Project, initial effort. Report IX. Operating cost estimate

    SciTech Connect (OSTI)

    none,

    1982-01-01T23:59:59.000Z

    Operating costs are normally broken into three major categories: variable costs including raw materials, annual catalyst and chemicals, and utilities; semi-variable costs including labor and labor related cost; and fixed or capital related charges. The raw materials and utilities costs are proportional to production; however, a small component of utilities cost is independent of production. The catalyst and chemicals costs are also normally proportional to production. Semi-variable costs include direct labor, maintenance labor, labor supervision, contract maintenance, maintenance materials, payroll overheads, operation supplies, and general overhead and administration. Fixed costs include local taxes, insurance and the time value of the capital investment. The latter charge often includes the investor's anticipated return on investment. In determining operating costs for financial analysis, return on investment (ROI) and depreciation are not treated as cash operating costs. These costs are developed in the financial analysis; the annual operating cost determined here omits ROI and depreciation. Project Annual Operating Costs are summarized in Table 1. Detailed supporting information for the cost elements listed below is included in the following sections: Electrical, catalyst and chemicals, and salaries and wages.

  7. Earned Value Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to examine detailed schedule information, critical program and technical milestones, and cost data. Earned Value Management System (EVMS) and Project Analysis Standard Operating...

  8. NIPSCO Small Business Direct Install Electric and Natural Gas Program

    Broader source: Energy.gov [DOE]

    NIPSCO's Small Business Direct Install Program is designed to help small businesses minimize energy costs, and provides energy-saving CFL lighting, showerheads and faucet aerators at no added cost.

  9. Unaccounted-for gas cost allocation

    SciTech Connect (OSTI)

    Ozenne, D.G. (Univ. of California, Los Angeles, CA (United States))

    1994-02-15T23:59:59.000Z

    As competitive pressures grow, gas utility managers have stepped up their search for ways to ensure that rates remain competitive. This challenge is particularly acute in the large commercial and industrial market segments, which are most typically [open quotes]at risk.[close quotes] A variety of cost-allocation studies have been undertaken to determine more accurately what costs are associated with serving market segments, and which costs should be recovered from each. Because there are clear winners and losers in this process (at least, it is clear who wins and loses in the short term), these reallocations have been hotly debated and fiercely litigated. Any proposed change in allocation must be supported by either compelling logic or empirical evidence. This article suggests a method of reallocating the costs associated with unaccounted-for (UAF) gas volumes, based on results from two studies of the elements contributing to UAF gas.

  10. Pension costs and liabilities

    E-Print Network [OSTI]

    Courtney, Harley Macon

    1961-01-01T23:59:59.000Z

    be to charge the cost over the current and subsequent years on the assumption that the cost, even though measured by past services, is incurred in contemplation of present and future 1 services. 1'he development of accounting thought concerning retire...? present liabilities are under- stated and owner's equity is overstated by a corresponding amount. It seems, however, that charging retained earnings with the past service cost does not, represent the true picture. Pension payments based solely on past...

  11. Supply chain management in the cement industry

    E-Print Network [OSTI]

    Agudelo, Isabel

    2009-01-01T23:59:59.000Z

    Traditionally supply chain management has played an operational role within cement and mineral extraction commodity companies. Recently, cost reduction projects have brought supply chain management into the limelight. In ...

  12. Quality Cost Analysis: Benefits and Risks Copyright Cem Kaner

    E-Print Network [OSTI]

    managers."1 Joseph Juran, one of the world's leading quality theorists, has been advocating the analysis. "Quality Costs" in Juran, J.M. & Gryna, F. M. (1988, 4th Ed.), Juran's Quality Control Handbook, Mc Gryna, F. M. "Quality Costs" in Juran, J.M. & Gryna, F. M. (1988, 4th Ed.), Juran's Quality Control

  13. California Federal Facilities: Rate-Responsive Buidling Operating for Deeper Cost and Energy Savings

    Broader source: Energy.gov [DOE]

    Fact sheet from the Federal Energy Management Program (FEMP) describes rate-responsive building operations for cost and energy savings in California federal facilities.

  14. Office of Inspector General audit report on the U.S. Department of Energy`s management of Associated Western Universities grant programs

    SciTech Connect (OSTI)

    NONE

    1998-04-01T23:59:59.000Z

    The Department of Energy (DOE), recognizing the need to maintain a strong science and engineering base at a time when enrollments in these disciplines were declining, implemented several educational programs. Among these were educational programs to provide faculty and students of US colleges and universities with energy-related training and research experience. Associated Western Universities (AWU), a nonprofit organization, administered post-secondary educational programs for DOE through grants and, occasionally, subcontracts. The objectives of the audit were to determine whether: (1) DOE was achieving its goal of enhancing US science and engineering education and (2) AWU was appropriately accumulating and classifying its costs. It was found that DOE was not fully achieving its objective of enhancing science and engineering education for students of US colleges and universities. In addition, it was found that AWU had not complied with cost principles for nonprofit organizations as required under the terms of the grants. Specifically, AWU misclassified a $13,000 overrun of direct program cost as indirect cost, incurred $40,000 of idle facility costs that were unallowable under the terms of the grant, misclassified indirect costs as direct costs, and claimed reimbursement for consultant costs that were inappropriate under the terms of the consulting contract. These discrepancies resulted in $53,000 of questionable costs, as well as costs having been charged to the Office of Energy Research (ER) grant that should have been charged to the Richland and Idaho grants. The authors recommended that the Managers of the Richland and Idaho Operations offices take actions to ensure that the objectives of DOE`s educational programs are met. In addition, they recommended that the Manager, Idaho Operations Office, direct the Contracting Officer to have AWU comply with the appropriate cost principles for nonprofit organizations.

  15. Cost comparison of 138 kV relay at TSS Natoma

    SciTech Connect (OSTI)

    Whetter, A.J. [ComEd, Chicago, IL (United States)

    1996-10-01T23:59:59.000Z

    This paper compares the costs of retro-fitting an electro-mechanical directional comparison blocking scheme with a microprocessor based dual directional comparison and under-reaching direct transfer tripping scheme on an existing panel at a 138 kV substation. Comparison is between the material, fabrication, engineering, drafting, construction, and testing costs. The cost per function of each scheme will be defined and compared. The results of this comparison will demonstrate the advantages of the new microprocessor based schemes in material costs, labor costs, and cost per function.

  16. Directives Help

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    All DOE directives are available through this site. While it may seem overwhelming, given the number of documents, we have provided a number of ways in which you may get to the information you need.

  17. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30T23:59:59.000Z

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09

  18. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30T23:59:59.000Z

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09.

  19. Battery Thermal Management System Design Modeling

    SciTech Connect (OSTI)

    Pesaran, A.; Kim, G. H.

    2006-11-01T23:59:59.000Z

    Looks at the impact of cooling strategies with air and both direct and indirect liquid cooling for battery thermal management.

  20. New Item is requested directly by Physician

    E-Print Network [OSTI]

    Oliver, Douglas L.

    New Item is requested directly by Physician and communicated to Materials Management via email New Item is requested via Special Needs Report and communicated to Materials Management via email New Item is requested via Vendor Rep on behalf of Physician and is communicated to Materials Management via email

  1. IDC RP2 & 3 US Industry Standard Cost Estimate Summary.

    SciTech Connect (OSTI)

    Harris, James M.; Huelskamp, Robert M.

    2015-01-01T23:59:59.000Z

    Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, using a commercial software cost estimation tool calibrated to US industry performance parameters. This is not a cost estimate for Sandia to perform the project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

  2. 400-FORM-0001 11/25/08 DIRECTIVES REQUIREMENTS LIST

    E-Print Network [OSTI]

    Christian, Eric

    GDMS GPR-1420.1 Forms Management GDMS GPR-1440.8 Records Management GDMS GPR-1710.1 Corrective and Project Management Req'ts. GDMS NPR 8705.4 Risk Classification for NASA Payloads GDMS NPD 8720.1 NASA-1400.1 Waiver Processing GDMS GPR-1410.1 Directives Management GDMS GPR-1410.2 Configuration Management

  3. POLICY ON INDIRECT COSTS RECOVERY FROM RESEARCH FUNDING AGENCIES NOT ACCREDITED BY SIRU

    E-Print Network [OSTI]

    Doedel, Eusebius

    POLICY ON INDIRECT COSTS RECOVERY FROM RESEARCH FUNDING AGENCIES NOT ACCREDITED BY SIRU Effective of this policy is to appropriately recognize and recover the costs incurred by the University in supporting research grant activity. DEFINITIONS For the purpose of this policy: Direct costs means costs that can

  4. Page 1 of 2 80.3 Consistent Treatment of Costs

    E-Print Network [OSTI]

    Yang, Eui-Hyeok

    Page 1 of 2 80.3 Consistent Treatment of Costs Policy Name: CONSISTENT TREATMENT OF COSTS October 2008 1. Policy Statement OMB Circular A21, Cost Principles for Educational Institutions, section J, contains a list of items that are deemed unallowable as direct costs on federally sponsored

  5. A Synthesis of Cost and Revenue Surveys for Gulf of Mexico Shrimp Vessels

    E-Print Network [OSTI]

    series cost data are not routinely collected for vessels operat ing in any of the U.S. southeast region of Published Cost and Revenue Data Differences underlying the cost and revenue surveys prevent direct compari in the survey data. For example, changes in the cost an

  6. advanced direct methanol: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to Direct Methanol Materials Science Websites Summary: increases the overall cost of the cell, reducing the fuel conversion efficiency. An alternative to H2): Application to...

  7. Cost Analysis of NEMO Protocol Md. Shohrab Hossain , Mohammed

    E-Print Network [OSTI]

    Atiquzzaman, Mohammed

    based on all-IP technology, compounded by the fact that the number of mobile nodes requiring mobility have developed analytical models to estimate total costs of key mobility management entities of NEMO, mobility management entities, computer networks. I. INTRODUCTION To ensure continuous Internet connectivity

  8. Hydrogen Refueling Station Costs in Shanghai

    E-Print Network [OSTI]

    Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

    2006-01-01T23:59:59.000Z

    identify particularly useful cost data and cost models thatcontaining hydrogen cost data for production, storage,Volume Validates cost data with Industry Operating Costs

  9. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    SciTech Connect (OSTI)

    LESKO KF; BERRIOCHOA MV

    2010-02-26T23:59:59.000Z

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  10. THE EFFECT OF INCREASING TRANSPORTATION COST ON FOREIGN DIRECT INVESTMENT. 

    E-Print Network [OSTI]

    Gressler, Kimberly

    2009-06-09T23:59:59.000Z

    This study showed that certain influences in the global environment may have an impact on FDI’s regional or country choice of investment. The following research questions were explored. Are changes in FDI location choices due to elevated...

  11. Cost-Competitive Advanced Thermoelectric Generators for Direct...

    Broader source: Energy.gov (indexed) [DOE]

    Accomplishments and Progress (cont.) 13 * We developed oxidation suppressing enamel coatings for skutterudite materials * We observed that enamel shows excellent protection...

  12. Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Automotive Applications Jayanti Sinha Stephen Lasher Yong Yang Peter Kopf Fuel Cell Tech Team Review September 24, 2008 TIAX LLC 15 Acorn Park Cambridge, MA 02140-2390...

  13. Low-Cost Direct Bonded Aluminum (DBA) Substrates

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment ofLetterEconomy andTerms LoanLosCombustionTimTextile Precursors

  14. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-09T23:59:59.000Z

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

  15. Estimating Renewable Energy Costs

    Broader source: Energy.gov [DOE]

    Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

  16. Investments of uncertain cost

    E-Print Network [OSTI]

    Pindyck, Robert S.

    1992-01-01T23:59:59.000Z

    I study irreversible investment decisions when projects take time to complete, and are subject to two types of uncertainty over the cost of completion. The first is technical uncertainty, i.e., uncertainty over the amount ...

  17. Human Resource Management Delegation

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-06-28T23:59:59.000Z

    The notice is to clarifies and updates existing Human Resource Management Delegation Authorities and the levels to which they are delegated. Expired 6-28-97. Does not cancel any directives.

  18. Cost-effectiveness analysis of effluent standards and limitations for the metal finishing industry. Final report

    SciTech Connect (OSTI)

    Not Available

    1983-06-01T23:59:59.000Z

    The report summarizes the results of a cost-effectiveness analysis of the metal finishing industry. The analysis considers the cost-effectiveness of the final metal finishing regulations for direct and indirect dischargers.

  19. Where do the default values for the cost of system breakdowns...

    Open Energy Info (EERE)

    values for the cost of system breakdowns come from in SAM, for direct and indirect costs, such as 0.63 per DC watt for panels. 0.18 for inverters. Are these base on a recent...

  20. The cost of noise reduction for powered-lift S.T.O.L. aircraft

    E-Print Network [OSTI]

    Moore, Wesley F.

    1973-01-01T23:59:59.000Z

    The direct operating costs and noise impacts of a wide variety of Externally Blown Flap and Augmentor Wing STOL short haul transport aircraft designs were evaluated to study the costs of noise reduction for these types of ...

  1. Standard costs for labor

    E-Print Network [OSTI]

    Khan, Mohammed Nurul Absar

    1960-01-01T23:59:59.000Z

    STANDARD COSTS FOR LABOR A Thesis By MD. NURUL ABSAR KHAN Submitted to the Graduate School of the Agricultural and Mechanical College of Texms in partial fulfillment of the requirements for the degree of MASTER OF BUSINESS ADMINISTRATION... January 1960 Ma/or Sub)acts Accounting STANOAHD COSTS FOR LABOR ND, NURUL ABSAR KHAN Approved as t style and content bys Chairman of Committee Head of Hepartment January 1960 The author acknowledges his indebtedness to Mr. T. M. Leland, Mr. T. D...

  2. Ensuring cost effectiveness in the TAP process

    SciTech Connect (OSTI)

    Trego, A.L.

    1992-06-16T23:59:59.000Z

    The Training Accredition Program (TAP) at the Waste Isolation Division (WID) is discussed by the general manager. Cost effectiveness in the TAP process is made possible by saving through sharing which refers to the exchange and co-development of information and technology among Westinghouse Government owned-contractor operators and with other organizations. In 1990 a comprehensive management and supervisor training (MAST) program plan was devised and a MAST certification program of 31 self-paced written moduler was developed. This program has proven to be inexpensive to develop and implement when compared to classroom training. In addition, total quality is used as a tool to continuously improve work process. Continuous improvement requires continued evaluation of work process, such as TAP analysis and development in summary to make training at DOE facilities the most cost-effective training anywhere, we need to share, challenge conventional wisdom, and seek to continuously improve.

  3. The Market Value and Cost of Solar Photovoltaic Electricity Production

    E-Print Network [OSTI]

    Borenstein, Severin

    2008-01-01T23:59:59.000Z

    the premium value of solar PV power to 0%-20% again. Whilepower to that location. While few dispute that the direct cost of electricity from the currently available solar

  4. The cost of noise reduction in commercial tilt rotor aircraft

    E-Print Network [OSTI]

    Faulkner, Henry B.

    1974-01-01T23:59:59.000Z

    The relationship between direct operating cost and departure noise annoyance was developed for commercial tilt rotor aircraft. This was accomplished by generating a series of tilt rotor aircraft designs to meet various ...

  5. Configuration Management Program - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power Administration would like submitCollector/Receiver CharacterizationConferenceConferences

  6. DOE - Office of Legacy Management -- Directions

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTuba City, Arizona, DisposalFourthNrr-osams ADMIN RCDBaseline0 0 0 0 0 0>

  7. Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program

    SciTech Connect (OSTI)

    NONE

    1992-04-29T23:59:59.000Z

    This report presents the findings of the Interagency Requirements Review of the Department of Energy (DOE) Environmental Restoration and Waste Management (ERWM) Program. The review was requested by Admiral Watkins to help determine the FY 1993 funding levels necessary to meet all legal requirements. The review was undertaken by analysts from the Office of Management and Budget (OMB) and Army Corps of Engineers, reporting to an Interagency Group (IAG) of senior Administration officials concerned with environmental cleanup issues. The purpose of the study was to determine the level of finding needed in FY 1993 for each ERWM Field Office to comply with all Federal, State, and local government legal requirements; all DOE Orders that establish standards for environment, safety and health (ES and H) management; and for prudent investments in other discretionary and management activities such as upgrading administrative buildings, information systems, etc. The study also reviewed the cost estimates supporting the ERWM proposed budget, including direct costs (labor, equipment) and indirect costs (administrative, landlord services, contractor overhead). The study did not analyze whether the Federal/State legal requirements and DOE Orders were necessary or whether the proposed clean-up remedies represent the most cost effective alternatives available.

  8. Security Event and Log Management Service

    E-Print Network [OSTI]

    Security Event and Log Management Service: Comprehensive, Cost-effective Approach to Enhance Network Security and Security Data Management IBM Global Technology Services December 2007 #12;Executive Summary The economics of network security have changed. The high cost and complexity inherent in the use

  9. DEPARTMENT OF FACILITIES MANAGEMENT PRIME CONSULTANT'S AGREEMENT

    E-Print Network [OSTI]

    deYoung, Brad

    for the construction and completion of the Project, or the approved Construction Cost Budget, whichever cost identified Consultant's Agreement (October 2013 Rev 2.2).doc PRIME CONSULTANT'S AGREEMENT INDEX 1. DEFINITIONS 2. PROJECT DESIGN STAFF 6. PROJECT MANAGEMENT/CONSTRUCTION MANAGEMENT 7. REIMBURSABLE EXPENSES 8. FEES 9

  10. Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States

    E-Print Network [OSTI]

    Barbose, Galen

    2009-01-01T23:59:59.000Z

    Cost and Risk: The Treatment of Renewable Energy in Westernand Risk Management in the US Electricity Sector,” Energyhow energy planners might better address and manage the risk

  11. Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States

    E-Print Network [OSTI]

    Barbose, Galen

    2008-01-01T23:59:59.000Z

    Cost and Risk: The Treatment of Renewable Energy in Westernand Risk Management in the US Electricity Sector,” Energyhow energy planners might better address and manage the risk

  12. Smog Check II Evaluation Part IV: Smog Check Costs and

    E-Print Network [OSTI]

    Denver, University of

    be in the range of $50 million to $100 million per year (given current gasoline prices). Direct Costs to Motorists if their vehicles fail. Gasoline savings offset some of the costs to owners of failing vehicles. Owners of older of pollution reductions. This estimate includes estimates of non-tailpipe hydrocarbon benefits and gasoline

  13. Filtering Decomposable Global Cost Functions D. Allouche1

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    frameworks (Schiex, Fargier, and Ver- faillie 1995) federates a variety of famous problems includ- ing CSP to weighted CSP, defining Global Cost Func- tions (Zytnicki et al. 2009; Lee and Leung 2012) with asso- ciated- composition is essentially equivalent to a direct application on the original global cost function. Finally

  14. Health Care Costs Associated with Violence in Pennsylvania 1994

    E-Print Network [OSTI]

    Songer, Thomas J.

    Health Care Costs Associated with Violence in Pennsylvania 1994 March 2000 Health Services Research of violent events that occurred in Pennsylvania for the year 1994, and to estimate the health care costs, and domestic abuse; self-directed violence, including completed and attempted suicide; and violence involving

  15. Cost Model for Digital Curation: Cost of Digital Migration

    E-Print Network [OSTI]

    Kejser, Ulla Břgvad; Nielsen, Anders Bo; Thirifays, Alex

    2009-01-01T23:59:59.000Z

    and Monitor Technology functions each consists of two costinfluence, the fewer costs. Monitor Technology depends onCost Critical Activities Monitor community Report on monitoring Monitor technology

  16. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-11-01T23:59:59.000Z

    To establish policy and to assign and describe roles and responsibilities for the Department of Energy (DOE) Emergency Management System. The Emergency Management System provides the framework for development, coordination, control, and direction of all emergency planning, preparedness, readiness assurance, response, and recovery actions. Canceled by DOE O 151.1B. Cancels DOE O 151.1.

  17. Construction Costs of Six Landfill Cover Designs

    SciTech Connect (OSTI)

    Dwyer, S.F.

    1998-12-23T23:59:59.000Z

    A large-scale field demonstration comparing and contrasting final landfill cover designs has been constructed and is currently being monitored. Four alternative cover designs and two conventional designs (a RCRA Subtitle `D' Soil Cover and a RCRA Subtitle `C' Compacted Clay Cover) were constructed side-by-side for direct comparison. The demonstration is intended to evaluate the various cover designs based on their respective water balance performance, ease and reliability of construction, and cost. This paper provides an overview of the construction costs of each cover design.

  18. Factors Affecting Auction Market Operating Costs.

    E-Print Network [OSTI]

    Wootan, Charley V.; McNeely, John G.

    1966-01-01T23:59:59.000Z

    Factors Affecting Auction Market Operating Costs Texas Summary and Conclusions T THE TIME THE DATA for this study were collected A there were 178 livestock auctions operating in Texas; 140 were included in this analysis. They ranyed in size... from just over 5,000 animal units per year to alinost 350,000. It has been sl~own that opera- - tional efficiency, measured in terms of average cost per unit marketed, increases directly with firm size and that efficiency gains were most marked...

  19. Factors Impacting Decommissioning Costs - 13576

    SciTech Connect (OSTI)

    Kim, Karen; McGrath, Richard [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)] [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)

    2013-07-01T23:59:59.000Z

    The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

  20. Mandatory Photovoltaic System Cost Analysis

    Broader source: Energy.gov [DOE]

    The Arizona Corporation Commission requires electric utilities to conduct a cost/benefit analysis to compare the cost of line extension with the cost of installing a stand-alone photovoltaic (PV)...

  1. Extension of DOE Directives

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-03-18T23:59:59.000Z

    The following directives are extended until 3-18-06: DOE N 205.8, Cyber Security Requirements for Wireless Devices and Information Systems, dated 2-11-04; DOE N 205.9, Certification and Accreditation Process for Information Systems Including National Security Systems, dated 02-19-04; DOE N 205.10, Cyber Security Requirements for Risk Management, dated 02-19-04; DOE N 205.11, Security Requirements for Remote Access to DOE and Applicable Contractor Information Technology Systems, dated 2-19-04. DOE N 205.12, Clearing, Sanitizing, and Destroying Information System Storage Media, Memory Devices, and Other Related Hardware, dated 2-19-04.

  2. Directions & Maps

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDiesel pricesDiesel28,CollapseDirections &

  3. Directives Points of Contact

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDieselDirections Both the Fermilab

  4. Directives Quarterly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDieselDirections Both the Fermilab

  5. Directives Quarterly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDieselDirections Both the

  6. Directives Quarterly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDieselDirections Both the

  7. Directives Quarterly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDieselDirections Both the

  8. Directives Quarterly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDieselDirections Both the

  9. A Growing and Costly Issue An estimated 1.8 million adult Texans have been

    E-Print Network [OSTI]

    A Growing and Costly Issue An estimated 1.8 million adult Texans have been diagnosed with diabetes, while the diabetes in another 460,000 remains undiagnosed. The annual cost of diabetes in Texas's Response Diabetes is not curable, but it is manageable. People can learn skills to effectively manage

  10. A Growing and Costly Issue An estimated 1.8 million adult Texans have been

    E-Print Network [OSTI]

    A Growing and Costly Issue An estimated 1.8 million adult Texans have been diagnosed with diabetes, while the diabetes of another 460,000 remains undiagnosed. The annual cost of diabetes in Texas's Response Diabetes is not curable, but it is manageable. People can learn skills to effectively manage

  11. Cost and Performance Assumptions for Modeling Electricity Generation Technologies

    SciTech Connect (OSTI)

    Tidball, R.; Bluestein, J.; Rodriguez, N.; Knoke, S.

    2010-11-01T23:59:59.000Z

    The goal of this project was to compare and contrast utility scale power plant characteristics used in data sets that support energy market models. Characteristics include both technology cost and technology performance projections to the year 2050. Cost parameters include installed capital costs and operation and maintenance (O&M) costs. Performance parameters include plant size, heat rate, capacity factor or availability factor, and plant lifetime. Conventional, renewable, and emerging electricity generating technologies were considered. Six data sets, each associated with a different model, were selected. Two of the data sets represent modeled results, not direct model inputs. These two data sets include cost and performance improvements that result from increased deployment as well as resulting capacity factors estimated from particular model runs; other data sets represent model input data. For the technologies contained in each data set, the levelized cost of energy (LCOE) was also evaluated, according to published cost, performance, and fuel assumptions.

  12. SOLID OXIDE FUEL CELL MANUFACTURING COST MODEL: SIMULATING RELATIONSHIPS BETWEEN PERFORMANCE, MANUFACTURING, AND COST OF PRODUCTION

    SciTech Connect (OSTI)

    Eric J. Carlson; Yong Yang; Chandler Fulton

    2004-04-20T23:59:59.000Z

    The successful commercialization of fuel cells will depend on the achievement of competitive system costs and efficiencies. System cost directly impacts the capital equipment component of cost of electricity (COE) and is a major contributor to the O and M component. The replacement costs for equipment (also heavily influenced by stack life) is generally a major contributor to O and M costs. In this project, they worked with the SECA industrial teams to estimate the impact of general manufacturing issues of interest on stack cost using an activities-based cost model for anode-supported planar SOFC stacks with metallic interconnects. An earlier model developed for NETL for anode supported planar SOFCs was enhanced by a linkage to a performance/thermal/mechanical model, by addition of Quality Control steps to the process flow with specific characterization methods, and by assessment of economies of scale. The 3-dimensional adiabatic performance model was used to calculate the average power density for the assumed geometry and operating conditions (i.e., inlet and exhaust temperatures, utilization, and fuel composition) based on publicly available polarizations curves. The SECA team provided guidance on what manufacturing and design issues should be assessed in this Phase I demonstration of cost modeling capabilities. They considered the impact of the following parameters on yield and cost: layer thickness (i.e., anode, electrolyte, and cathode) on cost and stress levels, statistical nature of ceramic material failure on yield, and Quality Control steps and strategies. In this demonstration of the capabilities of the linked model, only the active stack (i.e., anode, electrolyte, and cathode) and interconnect materials were included in the analysis. Factory costs are presented on an area and kilowatt basis to allow developers to extrapolate to their level of performance, stack design, materials, seal and system configurations, and internal corporate overheads and margin goals.

  13. Office of Human Resources -Employment & Compensation 1 MANAGEMENT NON-MANAGEMENT

    E-Print Network [OSTI]

    Yener, Aylin

    the work of two (2) or more employees · Majority of time is spent directly managing people (i.e. over 50Office of Human Resources - Employment & Compensation 1 MANAGEMENT NON-MANAGEMENT Typically includes, but is not limited to activities such as: Manages direct reports where primary duty

  14. Shifting the Paradigm for Long Term Monitoring at Legacy Sites to Improve Performance while Reducing Cost

    SciTech Connect (OSTI)

    Eddy-Dilek, Carol A.; Looney, Brian B.; Seaman, John; Kmetz, Thomas

    2013-01-10T23:59:59.000Z

    A major issue facing many government and private industry sites that were previously contaminated with radioactive and chemical wastes is that often the sites cannot be cleaned up enough to permit unrestricted human access. These sites will require long-term management, in some cases indefinitely, leaving site owners with the challenge of protecting human health and environmental quality in a cost effective manner. Long-term monitoring of groundwater contamination is one of the largest projected costs in the life cycle of environmental management at the Savannah River Site (SRS), the larger DOE complex, and many large federal and private sites. Currently, most monitoring strategies are focused on laboratory measurements of contaminants measured in groundwater samples collected from wells. This approach is expensive, and provides limited and lagging information about the effectiveness of cleanup activities and the behavior of the residual contamination. Over the last twenty years, DOE and other federal agencies have made significant investments in the development of various types of sensors and strategies that would allow for remote analysis of contaminants in groundwater, but these approaches do not promise significant reductions in risk or cost. Scientists at SRS have developed a new paradigm to simultaneously improve the performance of long term monitoring systems while lowering the overall cost of monitoring. This alternative approach incorporates traditional point measurements of contaminant concentration with measurements of controlling variables including boundary conditions, master variables, and traditional plume/contaminant variables. Boundary conditions are the overall driving forces that control plume movement and therefore provide leading indication to changes in plume stability. These variables include metrics associated with meteorology, hydrology, hydrogeology, and land use. Master variables are the key variables that control the chemistry of the groundwater system, and include redox variables (ORP, DO, chemicals), pH, specific conductivity, biological community (breakdown/decay products), and temperature. A robust suite of relatively inexpensive tools is commercially available to measure these variables. Traditional plume/contaminant variables are various measures of contaminant concentration including traditional analysis of chemicals in groundwater samples. An innovative long term monitoring strategy has been developed for acidic or caustic groundwater plumes contaminated with metals and/or radionuclides. Not only should the proposed strategy be more effective at early identification of potential risks, this strategy should be significantly more cost effective because measurement of controlling boundary conditions and master variables is relatively simple. These variables also directly reflect the evolution of the plume through time, so that the monitoring strategy can be modified as the plume 'ages'. This transformational long-term monitoring paradigm will generate significant cost savings to DOE, other federal agencies and industry and will provide improved performance and leading indicators of environmental management performance.

  15. Integrating Knowledge Management and Human Resources via Skill Management

    E-Print Network [OSTI]

    Appelrath, Hans-Jürgen

    Integrating Knowledge Management and Human Resources via Skill Management Norbert Gronau. The human resources department can look for certain skills and compare the skills of an employee [Kreitmeier et al. 2000]. The company is able to save costs that otherwise apply to placing adverts for job

  16. FY 1995 cost savings report

    SciTech Connect (OSTI)

    Andrews-Smith, K.L., Westinghouse Hanford

    1996-06-21T23:59:59.000Z

    Fiscal Year (FY) 1995 challenged us to dramatically reduce costs at Hanford. We began the year with an 8 percent reduction in our Environmental Management budget but at the same time were tasked with accomplishing additional workscope. This resulted in a Productivity Challenge whereby we took on more work at the beginning of the year than we had funding to complete. During the year, the Productivity Challenge actually grew to 23 percent because of recissions, Congressional budget reductions, and DOE Headquarters actions. We successfully met our FY 1995 Productivity Challenge through an aggressive cost reduction program that identified and eliminated unnecessary workscope and found ways to be more efficient. We reduced the size of the workforce, cut overhead expenses, eliminated paperwork, cancelled construction of new facilities, and reengineered our processes. We are proving we can get the job done better and for less money at Hanford. DOE`s drive to do it ``better, faster, cheaper`` has led us to look for more and larger partnerships with the private sector. The biggest will be privatization of Hanford`s Tank Waste Remediation System, which will turn liquid tank waste into glass logs for eventual disposal. We will also save millions of dollars and avoid the cost of replacing aging steam plants by contracting Hanford`s energy needs to a private company. Other privatization successes include the Hanford Mail Service, a spinoff of advanced technical training, low level mixed waste thermal treatment, and transfer of the Hanford Museums of Science and history to a private non-profit organization. Despite the rough roads and uncertainty we faced in FY 1995, less than 3 percent of our work fell behind schedule, while the work that was performed was completed with an 8.6 percent cost under-run. We not only met the FY 1995 productivity challenge, we also met our FY 1995-1998 savings commitments and accelerated some critical cleanup milestones. The challenges continue. Budgets remain on the decline, even while the expectations increase. Yet we are confident in our ability to keep our commitments and goals by identifying new efficiencies in the Hanford cleanup program. We will also pursue new contracting arrangements that will allow us to foster greater competition and use more commercial practices while maintaining our commitment to the safety and health of the public, our workers, and the environment.

  17. Calculator program optimizes bit weight, rotary speed, reducing drilling cost

    SciTech Connect (OSTI)

    Simpson, M.A.

    1984-04-23T23:59:59.000Z

    Bit selection, bit weight, and rotary speed have repeatedly proven to be the most important and commonly overlooked alterable factors which control penetration rate, footage, and overall drilling cost. This is particularly true in offshore operations where drilling costs are highest and the greatest cost savings stand to be achieved through implementation of proven optimization techniques. The myth that bit weights and rotary speeds cannot be optimized in directional holes has hindered the industry from using this virtually cost-free method for reducing drilling cost. The use of optimized bit weights and rotary speeds in conjunction with minimum cost bit programs based on cost per foot analysis of previous bit runs in the area was implemented on a five-well platform in the Grand Isle Block 20 field, offshore Louisiana. Each of the directional wells was drilled substantially faster and cheaper than the discovery well, which was a straight hole. Average reductions in footage cost of 31.3%, based on daily operating cost of $30,000/day, and increase in average daily footage drilled of 45.2% were effected by ''collectively optimizing'' drilling performance. The ''Optimizer'' program is an HP-41CV adaptation of the Bourgoyne and Young drilling model. It was used to calculate the optimum bit weights and rotary speeds based on field drilling tests; historical bit and bearing wear data; and current operating conditions, cost, and constraints.

  18. OPTIONS - ALLOCATION FUNDS - TRANSACTION COSTS

    E-Print Network [OSTI]

    Admin

    2009-03-25T23:59:59.000Z

    One first problem to overcome is the impact of transaction costs. ... They entail a reduction of transaction costs and improve the investor's economic welfare.

  19. Optimization Online - Sharing Supermodular Costs

    E-Print Network [OSTI]

    Andreas S. Schulz

    2007-08-28T23:59:59.000Z

    Aug 28, 2007 ... Abstract: We study cooperative games with supermodular costs. We show that supermodular costs arise in a variety of situations: in particular, ...

  20. Preemptive scheduling with position costs

    E-Print Network [OSTI]

    In most scheduling models presented in the literature [3, 10], the cost for ... Preemptive scheduling in order to minimize the total position costs also stems.

  1. Price/Cost Proposal Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PREPARATION INSTRUCTIONS PriceCost Proposal: Provide complete, current, and accurate cost or pricing data in accordance with Federal and Department of Energy Acquisition...

  2. Prescribed Burning Costs: Trends and Influences in the National Forest System1

    E-Print Network [OSTI]

    Standiford, Richard B.

    Prescribed Burning Costs: Trends and Influences in the National Forest System1 David A. Cleaves,2 Service's National Forest System prescribed burning activity and costs are examined. Fuels management officers from 95 National Forests reported costs and acreage burned for 4 types of prescribed fire

  3. Utility based Data Mining for Time Series Analysis -Cost-sensitive Learning for Neural Network Predictors

    E-Print Network [OSTI]

    Weiss, Gary

    Utility based Data Mining for Time Series Analysis - Cost-sensitive Learning for Neural Network@bis-lab.com ABSTRACT In corporate data mining applications, cost-sensitive learning is firmly established Mining General Terms Algorithms, Management, Economics Keywords Data Mining, cost-sensitive learning

  4. A Generic WebBased Network Management Application

    E-Print Network [OSTI]

    Afek, Yehuda

    of network manage­ ment applications that eliminates most of the tedious work, and reduces development costsA Generic Web­Based Network Management Application Yehuda Afek \\Lambda Yoram Cohen y Computer to network management is introduced. In traditional network management each management application

  5. Energy Management Practices at Dalls/Fort Worth International Airport

    E-Print Network [OSTI]

    Dennis, J. R.

    2013-01-01T23:59:59.000Z

    of the Airport?s energy conservation building codes and standards. Proposed Street Light for Southgate Fanwall AHU (TRIP) Energy Management Practices at DFW Airport, October 9, 2013 Demand-Side Management (cont.) ? Continuous Commissioning? ? Optimizes... Management Section ? Structure & Mission ? Supply-Side Management ? Reliability ? Cost (Risk) mitigation ? Environmental stewardship ? Demand-Side Management ? Energy monitoring ? Energy audits ? Energy standards ? Continuous Commissioning...

  6. Moving Core Services to the Edge in NGNs for Reducing Managed Infrastructure Size

    E-Print Network [OSTI]

    Amir, Yair

    % for CAPEX, while OPEX remains fairly stable due to network management and energy costs. At the same time we

  7. Low Cost, Durable Seal

    SciTech Connect (OSTI)

    Roberts, George; Parsons, Jason; Friedman, Jake

    2010-12-17T23:59:59.000Z

    Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

  8. Zero-Emission Vehicle Scenario Cost Analysis Using A Fuzzy Set-Based Framework

    E-Print Network [OSTI]

    Lipman, Timothy Edward

    1999-01-01T23:59:59.000Z

    The Promise of Methanol Fuel Cell Vehicles, For the AmericanCosts of Direct-Methanol Fuel Cell Vehicles Introductionof hydrogen and methanol fuel cell vehicles. Additionally, I

  9. Cost Type Examples Salary costs for staff working

    E-Print Network [OSTI]

    Rambaut, Andrew

    . Equipment access charges Service contracts, running costs, materials and consumables and staff time

  10. The Program Administrator Cost of Saved Energy for Utility Customer-Funded Energy Efficiency Programs

    SciTech Connect (OSTI)

    Billingsley, Megan A.; Hoffman, Ian M.; Stuart, Elizabeth; Schiller, Steven R.; Goldman, Charles A.; LaCommare, Kristina

    2014-03-19T23:59:59.000Z

    End-use energy efficiency is increasingly being relied upon as a resource for meeting electricity and natural gas utility system needs within the United States. There is a direct connection between the maturation of energy efficiency as a resource and the need for consistent, high-quality data and reporting of efficiency program costs and impacts. To support this effort, LBNL initiated the Cost of Saved Energy Project (CSE Project) and created a Demand-Side Management (DSM) Program Impacts Database to provide a resource for policy makers, regulators, and the efficiency industry as a whole. This study is the first technical report of the LBNL CSE Project and provides an overview of the project scope, approach, and initial findings, including: • Providing a proof of concept that the program-level cost and savings data can be collected, organized, and analyzed in a systematic fashion; • Presenting initial program, sector, and portfolio level results for the program administrator CSE for a recent time period (2009-2011); and • Encouraging state and regional entities to establish common reporting definitions and formats that would make the collection and comparison of CSE data more reliable. The LBNL DSM Program Impacts Database includes the program results reported to state regulators by more than 100 program administrators in 31 states, primarily for the years 2009–2011. In total, we have compiled cost and energy savings data on more than 1,700 programs over one or more program-years for a total of more than 4,000 program-years’ worth of data, providing a rich dataset for analyses. We use the information to report costs-per-unit of electricity and natural gas savings for utility customer-funded, end-use energy efficiency programs. The program administrator CSE values are presented at national, state, and regional levels by market sector (e.g., commercial, industrial, residential) and by program type (e.g., residential whole home programs, commercial new construction, commercial/industrial custom rebate programs). In this report, the focus is on gross energy savings and the costs borne by the program administrator—including administration, payments to implementation contractors, marketing, incentives to program participants (end users) and both midstream and upstream trade allies, and evaluation costs. We collected data on net savings and costs incurred by program participants. However, there were insufficient data on participant cost contributions, and uncertainty and variability in the ways in which net savings were reported and defined across states (and program administrators).

  11. Industrial Energy Management: Doing More with Less 

    E-Print Network [OSTI]

    Sheppard, J.; Tisot, A.

    2006-01-01T23:59:59.000Z

    INDUSTRIAL ENERGY MANAGEMENT: DOING MORE WITH LESS Jason Sheppard, Industrial Market Segment Manager Anthony Tisot, Communications Manager Power Monitoring and Control SCHNEIDER ELECTRIC Victoria, BC, Canada ABSTRACT The cost of doing... and quality of electricity can significantly affect operations and profits, it has traditionally been accepted as a non-negotiable business expense — the utility bill is paid each month without question, and the cost goes unchallenged. But energy is not a...

  12. A project management approach to the integrated reservoir characterization process

    SciTech Connect (OSTI)

    Tsingas, C.; Tyraskis, P.A.

    1995-12-31T23:59:59.000Z

    The ultimate goal of an Exploration and Production (E&P) organization is to increase reserves and optimize production in a cost effective manner. Efficient reservoir management requires in depth knowledge of reservoir properties and their distribution within the field. Saudi Aramco`s Exploration organization formed a multi-disciplinary team in order to develop an Integrated Reservoir Characterization Process Model (IRCPM). The IRCPM team produced a quantitative multi-disciplinary model of existing work, data and technology in order to optimize resources and minimize costs during reservoir characterization projects. The activities describing this generic, relational and dynamic model were input into project management software. An extensive analysis from the perspective of organizations, work flow and deliverables was performed, employing various project management concepts and tools. A thorough understanding of the interactions among various disciplines was identified, as well. The ability to incorporate the necessary software/hardware data acquisition, processing, interpretation, integration and management during the reservoir characterization process, resulted in serving to highlight both bridges and barriers in the flow of information and resources. The application of the IRCPM to a specific reservoir characterization process, showed that it can have a direct, positive impact on Saudi Aramco`s core mission - the more efficient production of hydrocarbons - through increasing efficiency of the reservoir projects to which it is applied.

  13. Work Experience Guidance for Managers

    E-Print Network [OSTI]

    Work Experience Guidance for Managers When approached with a request for work experience, managers. Any queries regarding CRB checks should be directed to your designated HR Manager. When a work any work, paid or unpaid: Before 7am or after 7pm For more than two hours on a school day or Sunday

  14. Computerized dairy records management systems

    E-Print Network [OSTI]

    Acosta, Alejandro E. Gonzalez

    1992-01-01T23:59:59.000Z

    . . . . . . 1. 3. Management Tools. . . . . . . . . . . . . . . . . . . . . . 1. 3. 1. Record Keeping History. . . . . . . . . . . . . . . . . . . . . . . . . . . 3 . . . . . . . 3 . . . . . 3 . . . . . . . 4 4 . . . . . . . 5 1. 3. 2. Hand-Kept v. s.... Computerized Records. . . . . . . . . . . 6 1. 3. 3. Direct Access to Records by Telephone. . . . . . . . . 6 II. HEIFER MANAGEMENT. 2. 1. Dairy Replacements. . 2. 2. Heifers Breeding Management . . . . . . . . . . . 7 . . . . . . . 7 . . . . . . . 8...

  15. Heliostat cost reduction study.

    SciTech Connect (OSTI)

    Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David (Advanced Thermal Systems, Larkspur, CO); Kolb, Gregory J.; Donnelly, Matthew W.

    2007-06-01T23:59:59.000Z

    Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

  16. Transaction Costs, Information Technology and Development

    E-Print Network [OSTI]

    Singh, Nirvikar

    2004-01-01T23:59:59.000Z

    Transaction Costs, Information Technology and Development 1.Transaction Costs, Information Technology and DevelopmentTransaction Costs, Information Technology and Development *

  17. Transaction Costs, Information Technology and Development

    E-Print Network [OSTI]

    Singh, Nirvikar

    2004-01-01T23:59:59.000Z

    Transaction Costs, Information Technology and Development 1.Transaction Costs, Information Technology and DevelopmentTransaction Costs, Information Technology and Development

  18. Allocable costs What are they?

    E-Print Network [OSTI]

    Massachusetts at Lowell, University of

    Allocable costs What are they? The A-21 circular definition: a. A cost is allocable to a particular cost objective (i.e., a specific function, project, sponsored agreement, department, or the like) if the goods or services involved are chargeable or assignable to such cost objective in accordance

  19. The Costs and Revenues of

    E-Print Network [OSTI]

    The Costs and Revenues of Transformation to Continuous Cover Forestry Owen Davies & Gary Kerr March 2011 #12;2 | Costs and Revenues of CCF | Owen Davies & Gary Kerr | March 2011 Costs and Revenues of CCF The costs and revenues of transformation to continuous cover forestry: Modelling silvicultural options

  20. Hay Harvesting Costs $$$$$ in Texas.

    E-Print Network [OSTI]

    Long, James T.; Taylor, Wayne D.

    1972-01-01T23:59:59.000Z

    Hay is an important crop in Ta 1 Harvesting costs constitute the major5 pense of hay production in many M Mg and Wayne D . Taylor INTRODUCTION .................................................... 2 Fixed Costs or Ownership Costs... ............................................. 10 Totarl Cost .............................................................. 10 HAY HARVESTING ALTERNATIVES COMPARED ...................... 11 HOW TO MAKE WISE DECISIONS CONCERNING INVESTMENTS IN MACHINERY...

  1. Construction Cost March 6, 2007

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    ...................................................................................................................................... 14 3.3 UMass Historical Cost Trends-- John Mathews, P.E., MPA, UMass Amherst............. 17 4 PartConstruction Cost Symposium March 6, 2007 University of Massachusetts Amherst #12;Construction Cost .......................................................... 22 4.3.2 The need for summer construction schedules and the impact on project cost......... 23 4

  2. Cost Estimating, Analysis, and Standardization

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1984-11-02T23:59:59.000Z

    To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

  3. Low cost subpixel method for vibration measurement

    SciTech Connect (OSTI)

    Ferrer, Belen [Department of Civil Engineering, Univ. Alicante P.O. Box, 99, 03080 Alicante (Spain); Espinosa, Julian; Perez, Jorge; Acevedo, Pablo; Mas, David [Inst. of Physics Applied to the Sciences and Technologies, Univ. Alicante P.O. Box, 99, 03080 Alicante (Spain); Roig, Ana B. [Department of Optics, Univ. Alicante P.O. Box, 99, 03080 Alicante (Spain)

    2014-05-27T23:59:59.000Z

    Traditional vibration measurement methods are based on devices that acquire local data by direct contact (accelerometers, GPS) or by laser beams (Doppler vibrometers). Our proposal uses video processing to obtain the vibration frequency directly from the scene, without the need of auxiliary targets or devices. Our video-vibrometer can obtain the vibration frequency at any point in the scene and can be implemented with low-cost devices, such as commercial cameras. Here we present the underlying theory and some experiments that support our technique.

  4. Combined Waste Form Cost Trade Study

    SciTech Connect (OSTI)

    Dirk Gombert; Steve Piet; Timothy Trickel; Joe Carter; John Vienna; Bill Ebert; Gretchen Matthern

    2008-11-01T23:59:59.000Z

    A new generation of aqueous nuclear fuel reprocessing, now in development under the auspices of the DOE Office of Nuclear Energy (NE), separates fuel into several fractions, thereby partitioning the wastes into groups of common chemistry. This technology advance enables development of waste management strategies that were not conceivable with simple PUREX reprocessing. Conventional wisdom suggests minimizing high level waste (HLW) volume is desirable, but logical extrapolation of this concept suggests that at some point the cost of reducing volume further will reach a point of diminishing return and may cease to be cost-effective. This report summarizes an evaluation considering three groupings of wastes in terms of cost-benefit for the reprocessing system. Internationally, the typical waste form for HLW from the PUREX process is borosilicate glass containing waste elements as oxides. Unfortunately several fission products (primarily Mo and the noble metals Ru, Rh, Pd) have limited solubility in glass, yielding relatively low waste loading, producing more glass, and greater disposal costs. Advanced separations allow matching the waste form to waste stream chemistry, allowing the disposal system to achieve more optimum waste loading with improved performance. Metals can be segregated from oxides and each can be stabilized in forms to minimize the HLW volume for repository disposal. Thus, a more efficient waste management system making the most effective use of advanced waste forms and disposal design for each waste is enabled by advanced separations and how the waste streams are combined. This trade-study was designed to juxtapose a combined waste form baseline waste treatment scheme with two options and to evaluate the cost-benefit using available data from the conceptual design studies supported by DOE-NE.

  5. S U P P L E M E N T A R T I C L E Determinants of Household Costs Associated

    E-Print Network [OSTI]

    Rheingans, Richard

    S U P P L E M E N T A R T I C L E Determinants of Household Costs Associated With Childhood households. We used survey data from sites in Bangladesh, India, and Pakistan to estimate the costs borne by households due to childhood diarrhea, including direct medical costs, direct nonmedical costs

  6. Earned Value Management Essentials 14 hours, $895

    E-Print Network [OSTI]

    Fork, Richard

    Earned Value Management Essentials 14 hours, $895 A growing demand for Earned Value Management (EVM in the tenets of work planned, work accomplished, and actual work cost. Earned Value terminology, formulae Management Analysis and Reporting 14 hours, $895 Government agencies and companies doing business

  7. Geothermal probabilistic cost study

    SciTech Connect (OSTI)

    Orren, L.H.; Ziman, G.M.; Jones, S.C.; Lee, T.K.; Noll, R.; Wilde, L.; Sadanand, V.

    1981-08-01T23:59:59.000Z

    A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)

  8. Lower Cost Energy Options

    E-Print Network [OSTI]

    Maze, M. E.

    the last f1ve years we have saved over $177 m11110n. 0= o u.vncGS AlIOTT DOMUTtC ENERGY COST & SAVINGS 11(000) uxm llOOOO lDXD ""'"lIXlIl ,..,.., 6CIlOll DlOO :om om a L--=.lLol.uLJULl:LJJU11.Lil:Ll..L<.LLLJ..lLo 7374.75'71i771BNlIJ nAIl F...

  9. Network Management Network Management

    E-Print Network [OSTI]

    that pertain to the operation, administration, maintenance, and provisioning of networked systems · Operation deals with keeping the network up (and the service provided by the network) · Administration involvesNetwork Management Pag. 1 Network Management Andrea Bianco Telecommunication Network Group Network

  10. Electric Demand Cost Versus Labor Cost: A Case Study

    E-Print Network [OSTI]

    Agrawal, S.; Jensen, R.

    Electric Utility companies charge industrial clients for two things: demand and usage. Depending on type of business and hours operation, demand cost could be very high. Most of the operations scheduling in a plant is achieved considering labor cost...

  11. Electric Demand Cost Versus Labor Cost: A Case Study 

    E-Print Network [OSTI]

    Agrawal, S.; Jensen, R.

    1998-01-01T23:59:59.000Z

    ELEcrRIC DEMAND COST Versus LABOR COST: A CASE STUDY Sanjay Agrawal Richard Jensen Assistant Director Director Industrial Assessment Center Department of Engineering Hofstra University, Hempstead, NY 11549 ABSTRAcr Electric Utility companies...

  12. LIFE Cost of Electricity, Capital and Operating Costs

    SciTech Connect (OSTI)

    Anklam, T

    2011-04-14T23:59:59.000Z

    Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

  13. Internationally Standardized Cost Item Definitions for Decommissioning of Nuclear Installations

    SciTech Connect (OSTI)

    Lucien Teunckens; Kurt Pflugrad; Candace Chan-Sands; Ted Lazo

    2000-06-04T23:59:59.000Z

    The European Commission (EC), the International Atomic Energy Agency (IAEA), and the Organization for Economic Cooperation and Development/Nuclear Energy Agency (OECD/NEA) have agreed to jointly prepare and publish a standardized list of cost items and related definitions for decommissioning projects. Such a standardized list would facilitate communication, promote uniformity, and avoid inconsistency or contradiction of results or conclusions of cost evaluations for decommissioning projects carried out for specific purposes by different groups. Additionally, a standardized structure would also be a useful tool for more effective cost management. This paper describes actual work and result thus far.

  14. Vehicle operating costs: evidence from developing countries

    SciTech Connect (OSTI)

    Chesher, A.; Harrison, R.

    1987-01-01T23:59:59.000Z

    The document presents information concerning the relationships between vehicle operating costs and highway conditions derived from four studies performed in Kenya, the Caribbean, Brazil, and India in the 1970s and early 1980s. The levels of transport costs and the amounts by which they are altered when highway conditions change depend on two main factors. The first is the production technology facing firms, in particular, the types and designs of vehicles to which firms have access. The second is the economic environment that firms face, in particular, relative prices of inputs to the production of transportation, such as fuel, tires, labor, and vehicles, and the nature of the transport markets that firms serve. The first part of the book sets out an economic model of firms managing vehicle fleets within which these influences can be examined. The second part of the book reports and interprets the results of the four major research projects which were designed to study the influences on vehicle operating costs. The third part of the book examines total vehicle operating costs.

  15. Postmortem Cost and Schedule Analysis - Lessons Learned On NCSX

    SciTech Connect (OSTI)

    R. Strykowsky, T. Brown, J. Chrzanowski, M. Cole, P. Heitzenroeder, G.H. Neilson, Donald Rej, and M. Viola

    2012-03-08T23:59:59.000Z

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative fusion energy confinement device developed by the Princeton Plasma Physics Laboratory (PPPL) and Oak Ridge National Laboratory (ORNL) under contract from the US Department of Energy. The project was technically very challenging, primarily due to the complex component geometries and tight tolerances that were required. As the project matured these challenges manifested themselves in significant cost overruns through all phases of the project (i.e. design, R&D, fabrication and assembly). The project was subsequently cancelled by the DOE in 2008. Although the project was not completed, several major work packages, comprising about 65% of the total estimated cost (excluding management and contingency), were completed, providing a data base of actual costs that can be analyzed to understand cost drivers. Technical factors that drove costs included the complex geometry, tight tolerances, material requirements, and performance requirements. Management factors included imposed annual funding constraints that throttled project cash flow, staff availability, and inadequate R&D. Understanding how requirements and design decisions drove cost through this top-down forensic cost analysis could provide valuable insight into the configuration and design of future state-of-the art machines and other devices.

  16. Cost analysis of German waste repositories

    SciTech Connect (OSTI)

    Berg, H.P.; Debski, H.J. [Bundesamt fuer Strahlenschutz, Salzgitter (Germany)

    1993-12-31T23:59:59.000Z

    In forecasting costs of final disposal for radioactive waste, the determined disposal concept and operational aspects such as the necessary amount for personnel to operate the repository are important. Even for the German deep geological concept, there are large differences resulting from the assessment to select an already existing mine or a completely new formation as a disposal site. Based on actual planning, the expected total costs of the running waste repository projects in the Federal Republic of Germany are presented including their distribution to single aspects like project management, underground investigation, licensing work and construction. Moreover, the actual expenditures for the different waste repositories are given and as far as possible the prices per m{sup 3}.

  17. Lead By Example with Smart Energy Management (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2009-07-01T23:59:59.000Z

    Brochure outlining the mission and activities of the Department of Energy's Federal Energy Management Program, which facilitates the Federal Government's implementation of sound, cost-effective energy management and investment practices to enhance the nation's energy security and environmental stewardship.

  18. Harrison Radiator Division's Energy Management, Reporting and Accounting System 

    E-Print Network [OSTI]

    Goubeaux, R. J.

    1986-01-01T23:59:59.000Z

    Energy management is essential for obtaining the lowest possible product manufacturing cost. Many systems have been created over the years to manage the energy used in manufacturing. However, for a variety of reasons, most of them never reached...

  19. Product development risk management and the role of transparency

    E-Print Network [OSTI]

    Olechowski, Alison L. (Alison Louise)

    2012-01-01T23:59:59.000Z

    Risks in product development lead to schedule and cost over-runs and poor product quality. While numerous risk management frameworks have been published and research on specific risk management practices and methods has ...

  20. Directives Review Board - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavidDieselDirections Both theDirectives Review Board

  1. National Synchrotron Light Source Facility Manual Maintenance Management Program. Revision 1

    SciTech Connect (OSTI)

    Fewell, N.

    1993-12-01T23:59:59.000Z

    The purpose of this program s to meet the policy and objectives for the management and performance of cost-effective maintenance and repair of the National Synchrotron Light Source, as required by the US Department of Energy order DOE 433O.4A. It is the DOE`s policy that: The maintenance management program for the NSLS be consistent with this Order and that NSLS property is maintained in a manner which promotes operational safety, worker health, environmental protection and compliance, property preservation, and cost-effectiveness while meeting the NSLS`s programmatic mission. Structures, components and systems (active and passive) that are imporant to safe operation of the NSLS shall be subject to a maintenance program to ensure that they meet or exceed their design requirements throughout the life of the NSLS. Periodic examination of structures, systems components and equipment be performed to determine deterioration or technical obsolescence which may threaten performance and/or safety. Primary responsibility, authority, and accountability for the direction and management of the maintenance program at the NSLS reside with the line management assigned direct programmatic responsibility. Budgeting and accounting for maintenance programs are consistent with DOE Orders guidance.

  2. Edinburgh Research Explorer Effect of the UK's revised paracetamol poisoning management

    E-Print Network [OSTI]

    Edinburgh, University of

    Edinburgh Research Explorer Effect of the UK's revised paracetamol poisoning management guidelines of the UK's revised paracetamol poisoning management guidelines on admissions, adverse reactions and costs. 2014 #12;Effect of the UK's revised paracetamol poisoning management guidelines on admissions, adverse

  3. 7th International Conference on Product Lifecycle Management 1 Semantic tags for generative multiview product

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    7th International Conference on Product Lifecycle Management 1 Semantic tags for generative. Conf. Product Lifecycle Management. Biographical notes: Thomas Paviot is an Assistant Professor and the Product Lifecycle Management (PLM) strategy are solutions allowing to achieve objectives of cost

  4. Looking at Resource Sharing Costs

    E-Print Network [OSTI]

    Leon, Lars; Kress, Nancy

    2012-05-23T23:59:59.000Z

    Purpose – This paper is the result of a small cost study of resource sharing services in 23 North American libraries. Trends that have affected resource sharing costs since the last comprehensive study are discussed. Design/methodology approach...

  5. User cost in oil production

    E-Print Network [OSTI]

    Adelman, Morris Albert

    1990-01-01T23:59:59.000Z

    The assumption of an initial fixed mineral stock is superfluous and wrong. User cost (resource rent) in mineral production is the present value of expected increases in development cost. It can be measured as the difference ...

  6. Low Cost Carbon Fiber Overview

    Broader source: Energy.gov (indexed) [DOE]

    UT-Battelle for the U.S. Department of Energy Presentationname CARBON FIBER OVERVIEW Materials LM002 Task FY 2010 Budget Industry Cost Share FY 2011 Budget Industry Cost Share...

  7. PHEV Battery Cost Assessment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of Contamination in ManyDepartmentOutreachDepartment ofProgram49,PHEV Battery Cost

  8. AVLIS Production Plant Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1984-11-15T23:59:59.000Z

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  9. Programs of the Governor's Energy Management Center

    E-Print Network [OSTI]

    Verdict, M.

    1988-01-01T23:59:59.000Z

    The 70th Texas Legislature transferred the Energy Efficiency Division of the Public Utility Commission to the Governor's Office in September 1987 and directed the Governor's Energy Management Center (GEMC) to perform energy management services...

  10. Safety Management Functions, Responsibilities, and Authorities Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-10-08T23:59:59.000Z

    This Manual defines safety management functions, responsibilities, and authorities for DOE senior management with responsibilities for line, support, oversight, and enforcement actions. Canceled by DOE M 411.1-1A. Does not cancel other directives.

  11. Wind Integration Cost and Cost-Causation: Preprint

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

    2013-10-01T23:59:59.000Z

    The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

  12. Enriching personal information management with document interaction histories

    E-Print Network [OSTI]

    Whitton, Mary C.

    Enriching personal information management with document interaction histories by Karl Gyllstrom;Abstract KARL GYLLSTROM: Enriching personal information management with document interaction histories. (Under the direction of David Stotts.) Personal information management is increasingly challenging

  13. RETHINKING STANDBY & FIXED COST CHARGES

    E-Print Network [OSTI]

    intended to recover a more significant share of fixed costs solely from solar PV customer- generators rooftop solar PV development at limited to no cost to taxpayers and non-solar utility customers. StandbyPage | i RETHINKING STANDBY & FIXED COST CHARGES: REGULATORY & RATE DESIGN PATHWAYS TO DEEPER SOLAR

  14. Check Estimates and Independent Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

  15. Processing Cost Analysis for Biomass Feedstocks

    SciTech Connect (OSTI)

    Badger, P.C.

    2002-11-20T23:59:59.000Z

    The receiving, handling, storing, and processing of woody biomass feedstocks is an overlooked component of biopower systems. The purpose of this study was twofold: (1) to identify and characterize all the receiving, handling, storing, and processing steps required to make woody biomass feedstocks suitable for use in direct combustion and gasification applications, including small modular biopower (SMB) systems, and (2) to estimate the capital and operating costs at each step. Since biopower applications can be varied, a number of conversion systems and feedstocks required evaluation. In addition to limiting this study to woody biomass feedstocks, the boundaries of this study were from the power plant gate to the feedstock entry point into the conversion device. Although some power plants are sited at a source of wood waste fuel, it was assumed for this study that all wood waste would be brought to the power plant site. This study was also confined to the following three feedstocks (1) forest residues, (2) industrial mill residues, and (3) urban wood residues. Additionally, the study was confined to grate, suspension, and fluidized bed direct combustion systems; gasification systems; and SMB conversion systems. Since scale can play an important role in types of equipment, operational requirements, and capital and operational costs, this study examined these factors for the following direct combustion and gasification system size ranges: 50, 20, 5, and 1 MWe. The scope of the study also included: Specific operational issues associated with specific feedstocks (e.g., bark and problems with bridging); Opportunities for reducing handling, storage, and processing costs; How environmental restrictions can affect handling and processing costs (e.g., noise, commingling of treated wood or non-wood materials, emissions, and runoff); and Feedstock quality issues and/or requirements (e.g., moisture, particle size, presence of non-wood materials). The study found that over the years the industry has shown a good deal of ingenuity and, as a result, has developed several cost effective methods of processing and handling wood. SMB systems usually cannot afford to perform much onsite processing and therefore usually purchase fuels processed to specification. Owners of larger systems try to minimize onsite processing to minimize processing costs. Whole truck dumpers are expensive, but allow for faster and easier unloading, which reduces labor costs and charges by the haulers. Storage costs are a major factor in overall costs, thus the amount of fuel reserve is an important consideration. Silos and bins are relatively expensive compared to open piles used for larger facilities, but may be required depending on space available, wood characteristics, and amount of wood to be stored. For larger systems, a front-end loader has a lot of flexibility in use and is an essential piece of equipment for moving material. Few opportunities appear to exist for improving the cost effectiveness of these systems.

  16. Keeping the Lights on While Cutting Costs.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1998-08-01T23:59:59.000Z

    In 1992, the Bonneville Power Administration spent $361 million in capital on a system to transmit electricity. By 1998, it was spending about one-third that amount: $123 million. In 1992, BPA`s expenses for managing, operating and maintaining the transmission system ran $160 million. By 1998, BPA had cut expenses to $128 million. Maintenance costs alone were cut 28%. In 1992, management of the grid was split into six organizations. Today, there is one. About 2,900 people worked for transmission in October 1992. By February 1998, the Transmission Business Line (TBL) employed 1,855. Transmission in 1992 for the most part meant new towers, lines and substations. Today it means computers, digital communications and electronic controls.

  17. Critical analysis of the Hanford spent nuclear fuel project activity based cost estimate

    SciTech Connect (OSTI)

    Warren, R.N.

    1998-09-29T23:59:59.000Z

    In 1997, the SNFP developed a baseline change request (BCR) and submitted it to DOE-RL for approval. The schedule was formally evaluated to have a 19% probability of success [Williams, 1998]. In December 1997, DOE-RL Manager John Wagoner approved the BCR contingent upon a subsequent independent review of the new baseline. The SNFP took several actions during the first quarter of 1998 to prepare for the independent review. The project developed the Estimating Requirements and Implementation Guide [DESH, 1998] and trained cost account managers (CAMS) and other personnel involved in the estimating process in activity-based cost (ABC) estimating techniques. The SNFP then applied ABC estimating techniques to develop the basis for the December Baseline (DB) and documented that basis in Basis of Estimate (BOE) books. These BOEs were provided to DOE in April 1998. DOE commissioned Professional Analysis, Inc. (PAI) to perform a critical analysis (CA) of the DB. PAI`s review formally began on April 13. PAI performed the CA, provided three sets of findings to the SNFP contractor, and initiated reconciliation meetings. During the course of PAI`s review, DOE directed the SNFP to develop a new baseline with a higher probability of success. The contractor transmitted the new baseline, which is referred to as the High Probability Baseline (HPB), to DOE on April 15, 1998 [Williams, 1998]. The HPB was estimated to approach a 90% confidence level on the start of fuel movement [Williams, 1998]. This high probability resulted in an increased cost and a schedule extension. To implement the new baseline, the contractor initiated 26 BCRs with supporting BOES. PAI`s scope was revised on April 28 to add reviewing the HPB and the associated BCRs and BOES.

  18. U.S. risk management can reduce regulation, enhance safety

    SciTech Connect (OSTI)

    Willke, T.L. [Gas Research Inst., Chicago, IL (United States); Shires, T.M.; Cowgill, R.M. [Radian International LLC, Austin, TX (United States); Selig, B.J. [Hartford Steam Boiler Inspection and Insurance Co., CT (United States)

    1997-06-16T23:59:59.000Z

    The only way to slow the spiraling costs of new prescriptive pipeline regulations is to develop an effective risk-management program, one that will focus on the highest priority safety issues not minimum compliance with regulation. If applied systematically and rigorously, risk management can help pipeline operators focus on safety issues specific to their own systems. These operators have a greater understanding of the condition of their systems and what it takes to keep them operating safely. This knowledge, along with the flexibility inherent in the US approach to risk management, can lead to a more effective use of resources devoted to pipeline safety. When an accident occurs, data generated in a risk-management program will provide a mechanism for understanding the causes of an incident. Such information can also direct future efforts toward the most effective actions to ensure that similar incidents are unlikely to occur again. The paper discusses two incidents, an oil products pipeline rupture in Washington, DC and a natural gas pipeline rupture in Edison, NJ. Current regulations for gas pipelines, the US approach to risk management, implementation, performance measurement, accident prevention, and issues to be resolved are discussed.

  19. Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

  20. The Local Data Manager (LDM) The Unidata Local Data Manager (LDM) is a collection of

    E-Print Network [OSTI]

    and educators at no cost. This data consists primarily of GOES satellite imagery, radar imagery (level IIFact Sheet Data The Local Data Manager (LDM) The Unidata Local Data Manager (LDM) is a collection of cooperating programs that select, capture, manage, and distribute arbitrary data products. The system