Powered by Deep Web Technologies
Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

MANAGEMENT CONTROL SYSTEM IN PUBLIC  

E-Print Network [OSTI]

1 MANAGEMENT CONTROL SYSTEM IN PUBLIC ADMINISTRATION: BEYOND RATIONAL MYTHS Nicolas Berland of practices around their management control systems. Despite some apparent failures, the implemented systems organizations have developed management control systems. Historically, these systems have been invented

Paris-Sud XI, Université de

2

Management of Control System Information SecurityI: Control System Patch Management  

SciTech Connect (OSTI)

The use of information technologies in control systems poses additional potential threats due to the frequent disclosure of software vulnerabilities. The management of information security involves a series of policy-making on the vulnerability discovery, disclosure, patch development and patching. In this paper, we use a system approach to devise a model to understand the interdependencies of these decision processes. In more details, we establish a theoretical framework for making patching decision for control systems, taking into account the requirement of functionability of control systems. We illustrate our results with numerical simulations and show that the optimal operation period of control systems given the currently estimated attack rate is roughly around a half a month.

Quanyan Zhu; Miles McQueen; Craig Rieger; Tamer Basar

2011-09-01T23:59:59.000Z

3

Recommended Practice for Patch Management of Control Systems  

SciTech Connect (OSTI)

A key component in protecting a nation’s critical infrastructure and key resources is the security of control systems. The term industrial control system refers to supervisory control and data acquisition, process control, distributed control, and any other systems that control, monitor, and manage the nation’s critical infrastructure. Critical Infrastructure and Key Resources (CIKR) consists of electric power generators, transmission systems, transportation systems, dam and water systems, communication systems, chemical and petroleum systems, and other critical systems that cannot tolerate sudden interruptions in service. Simply stated, a control system gathers information and then performs a function based on its established parameters and the information it receives. The patch management of industrial control systems software used in CIKR is inconsistent at best and nonexistent at worst. Patches are important to resolve security vulnerabilities and functional issues. This report recommends patch management practices for consideration and deployment by industrial control systems owners.

Steven Tom; Dale Christiansen; Dan Berrett

2008-12-01T23:59:59.000Z

4

Managing Uncertainty in Operational Control of Water Distribution Systems  

E-Print Network [OSTI]

Managing Uncertainty in Operational Control of Water Distribution Systems A. Bargiela Department. There are system management decisions concerning the regulatory measures such as water pricing principles, effluent in water distribution systems con- cern reservoir(s) management with associated pump scheduling

Bargiela, Andrzej

5

Monitoring Buildings with Energy Management and Control Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Monitoring Buildings with Energy Management and Control Systems Monitoring and evaluation are important parts of all energy-efficiency programs. With the increasing regulatory requirements for verification of demand-side management program savings and continued development of more innovative financing mechanisms, the ability to substantiate claims of energy savings using measured data takes on added importance. Although expensive, the accurate monitoring of energy consumption and building operations is a necessary part of conservation savings analysis. Energy management and control systems (EMCSs), intended for building operations and control functions, already contain most of the same equipment usually installed for energy monitoring and can often be used for

6

A Smart Energy System: Distributed Resource Management, Control and Optimization  

E-Print Network [OSTI]

A Smart Energy System: Distributed Resource Management, Control and Optimization Yong Ding, Student of distributed energy resource and consumption management, which proposes to design a networked and embedded platform for realizing a dynamic energy mix and optimizing the energy consumption dy- namically. Based

Beigl, Michael

7

Trends in Energy Management Technology - Part 3: State of Practiceof Energy Management, Control, and Information Systems  

SciTech Connect (OSTI)

In this report, the third in a series, we provide an evaluation of several products that exemplify the current state of practice of Energy Management, Control, and Information Systems (EMCIS). The available features for these products are summarized and analyzed with regard to emerging trends in EMCIS and potential benefits to the federal sector. The first report [1] covered enabling technologies for emerging energy management systems. The second report [2] serves as a basic reference for building control system (BCS) networking fundamentals and includes an assessment of current approaches to open communications. Part 4 of this series will discuss applications software from a user's perspective. It is important for energy managers in the Federal sector to have a high level of knowledge and understanding of these complex energy management systems. This series of reports provides energy practitioners with some basic informational and educational tools to help make decisions relative to energy management systems design, specification, procurement, and energy savings potential.

Yee, Gaymond; Webster, Tom

2004-02-01T23:59:59.000Z

8

A Scenario-based Predictive Control Approach to Building HVAC Management Systems  

E-Print Network [OSTI]

A Scenario-based Predictive Control Approach to Building HVAC Management Systems Alessandra Parisio and Air Conditioning (HVAC) systems while minimizing the overall energy use. The strategy uses

Johansson, Karl Henrik

9

Configuration Management and Version Control in Earth System Modelling  

Science Journals Connector (OSTI)

This section discusses the process of developing and constructing Earth System Models (ESMs). The construction of an ESM...configuration management (CM), the process of handling change in software systems wh...

Mick Carter; Dave Matthews

2012-01-01T23:59:59.000Z

10

Selection and Evaluation of Energy Management and Control Systems  

E-Print Network [OSTI]

that at one time or another the central control of any system will fail. Therefore, it is an absolute must that any system allow for reasonable function ing with the central control inoperable. S. A system should be appropriate to the situations within... that at one time or another the central control of any system will fail. Therefore, it is an absolute must that any system allow for reasonable function ing with the central control inoperable. S. A system should be appropriate to the situations within...

Moderow, R. R.

1982-01-01T23:59:59.000Z

11

MANAGED OBJECT PATTERN Class Behavioral Provide direct control of individual resources in a managed system. The Managed Object  

E-Print Network [OSTI]

in a managed system. The Managed Object provides a one-to-one mapping to the manageable entities, as well system, in which case the Manager-Agent pattern might be more appropriate). #12;2 / 4 Structure management systems to learn about the contents of the MIB. · Managed Object - Represents a single resource

Keller, Rudolf K.

12

An Intelligent Multi Agent System for Integrated Control & Asset Management of Petroleum Production Facilities  

E-Print Network [OSTI]

An Intelligent Multi Agent System for Integrated Control & Asset Management of Petroleum Production management system for the offshore oil and gas industry in Atlantic Canada. The research program has achieved several milestones. The conceptual model of an automated asset management system, its architecture

Taylor, James H.

13

Major: Ecological Systems Design, Air Quality Control and Waste Management  

E-Print Network [OSTI]

mechanics (Wang), 3 CP Air quality and health impact (Schleibinger, Wang, Wick), 3 CP Air Pollution Modeling pollution issues and control technology · Hands-on knowledge of state-of-the-art air quality monitoring questions · Solve complex problems from a system-oriented perspective · Understanding air pollution sources

Giger, Christine

14

HVAC & Building Management Control System Energy Efficiency Replacements  

SciTech Connect (OSTI)

The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

Hernandez, Adriana

2012-09-21T23:59:59.000Z

15

Demonstration of SCADA system to Manage Oilfield Pump Off Controllers  

SciTech Connect (OSTI)

PC-based SCADA systems are today widely accepted by the oil and gas industry, thanks to the increased power and capabilities of PCs, their reduced costs, and the wider use of PCs by energy companies in office and field operations. More and more field operators are using laptops in their daily work duties. This has made the PC the choice for field SCADA systems, and for making SCADA data available throughout company operations. As PCs have become more powerful, it has allowed SCADA software developers to add more capabilities to their systems. SCADA systems have become tools that now help field operators perform their jobs more efficiently, facilitate in optimizing producing wells, provide an active interface for monitoring and controlling plants and compressors, and provide real-time and historical well data to engineers to help them develop strategies for optimizing field operations.

Newquist, Dan

2000-09-11T23:59:59.000Z

16

Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan  

SciTech Connect (OSTI)

This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.

RIECK, C.A.

1999-02-23T23:59:59.000Z

17

Capital budgeting methods, management control systems and the R&D intensity of the firm  

Science Journals Connector (OSTI)

This paper investigates the effect of the Research and Development (R&D) intensity of the firm on the use of management control systems, capital budgeting methods and the methods to determine the cost of capital. Based on earlier literature, we develop several hypotheses that we test empirically, using survey data of the 101 Finnish firms operating in the capital area. The results indicate that the use of management control systems such as control and bonus systems, budgeting and strategic alliances increases with the degree of the R&D intensity of the firm. The results also indicate that high-R&D-intensity firms use formal capital budgeting methods within large and strategic projects. Finally, our results show that the use of sophisticated capital budgeting methods such as Net Present Value (NPV) and Internal Rate of Return (IRR) methods increases with the R&D intensity of the firm. Our results remain materially the same after controlling for several firm characteristics.

Hanna Silvola

2008-01-01T23:59:59.000Z

18

Toward A Practical Multi-agent System for Integrated Control and Asset Management of Petroleum Production Facilities  

E-Print Network [OSTI]

Toward A Practical Multi-agent System for Integrated Control and Asset Management of Petroleum intelligent multi- agent system for asset management for the petroleum industry, which is crucial the feasibility of an intelligent asset management system. Having proposed a conceptual model, architecture

Taylor, James H.

19

Prototype Design of A Multi-agent System for Integrated Control and Asset Management of Petroleum Production Facilities  

E-Print Network [OSTI]

Prototype Design of A Multi-agent System for Integrated Control and Asset Management of Petroleum intelligent multi- agent system for asset management for the petroleum industry, which is crucial the feasibility of an intelligent asset management system. Having proposed a conceptual model, architecture

Taylor, James H.

20

LRRB Pavement Management Systems Pavement Management Systems  

E-Print Network [OSTI]

LRRB Pavement Management Systems Pavement Management Systems Presented by: Michael Marti SRF for implementing and monitoring research results (RIC) #12;LRRB Pavement Management Systems LRRB Structure LRRB Current Pavement Management System Used ICON (Goodpointe) Year of Pavement Management System

Minnesota, University of

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Power management of hybrid micro-grid system by a generic centralized supervisory control scheme  

Science Journals Connector (OSTI)

Abstract This paper presents a generic centralized supervisory control scheme for the power management of multiple power converters based hybrid micro-grid system. The system consists of wind generators, photovoltaic system, multiple parallel connected power converters, utility grid, ac and dc loads. Power management of the micro-grid is performed under two cases: grid mode and local mode. Central supervisory unit (CSU) generates command signal to ensure the power management during the two modes. In local mode, the dc loads in the ac–dc hybrid system can be controlled. In the case of grid mode operation, power flow between the utility grid and micro-grid is controlled. A novel feature of this paper is the incorporation of the multiple power converters. The generated command signal from the CSU can also control the operation of the multiple power converters in both grid and local modes. An additional feature is the incorporation of sodium sulfur battery energy storage system (NAS BESS) which is used to smooth the output power fluctuation of the wind farm. The effectiveness of the control scheme is also verified using real time load pattern. The simulation is performed in PSCAD/EMTDC.

Mir Nahidul Ambia; Ahmed Al-Durra; Cedric Caruana; S.M. Muyeen

2014-01-01T23:59:59.000Z

22

Fuzzy Based Energy Management Control of A Hybrid Fuel Cell Auxiliary Power System  

E-Print Network [OSTI]

battery auxiliary power unit (APU) for remote applications where a fuel cell is the main energy source for decentralized or distributed energy production, such as telecom, remote sites or even for military applicationsFuzzy Based Energy Management Control of A Hybrid Fuel Cell Auxiliary Power System M. Godoy Simões1

Simões, Marcelo Godoy

23

Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development  

Broader source: Energy.gov [DOE]

Slide Presentation by Rich Davies, Kami Lowry, Mike Schlender, Pacific Northwest National Laboratory (PNNL) and Ted Pietrok, Pacific Northwest Site Office (PNSO). Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development. Work Planning and Control (WP&C) is essential to assuring the safety of workers and the public regardless of the scope of work Research and Development (R&D) activities are no exception.

24

An Approach to Supervisory Control of an Energy Management Control System Using Fuzzy Logic  

E-Print Network [OSTI]

In this paper an approach to supervisory control of multi-stage industrial control systems is presented. This approach is based on the notion of an internal reference model, and further makes use of a fuzzy multi-objective optimization strategy...

Langari, R.

25

The interactive on-site inspection system: An information management system to support arms control inspections  

SciTech Connect (OSTI)

The increasing use of on-site inspection (OSI) to meet the nation`s obligations with recently signed treaties requires the nation to manage a variety of inspection requirements. This document describes a prototype automated system to assist in the preparation and management of these inspections.

DeLand, S.M.; Widney, T.W.; Horak, K.E.; Caudell, R.B.; Grose, E.M.

1996-12-01T23:59:59.000Z

26

Analysis of control strategies for thermally activated building systems under demand side management mechanisms  

Science Journals Connector (OSTI)

Abstract Thermally activated buildings systems (TABS) are systems that integrate heating/cooling devices in the building structure, so that the building elements act as thermal storage and have an active role in the energy supply and demand management. Although TABS are well known systems, there are still open questions in their realization, mainly concerning appropriate control strategies which are influenced by the large thermal inertia. The purpose of this paper is to analyze the influence of demand side management control strategies on the performance of a thermally activated building system applied in a commercial building. The goal is to estimate the potential of TABS for load shifting requested by the electricity grid. The analysis is performed by means of a sample case: first the existing TABS control strategy and then the possible implementation of DSM mechanisms are analyzed. In particular three different demand side management mechanisms are evaluated: (i) a peak shaving strategy, (ii) a random request of switching on/off the system and (iii) a night load shifting strategy. The simulation results show high potential of TABS within the DSM framework, since TABS allow load control while scarcely affect thermal comfort.

A. Arteconi; D. Costola; P. Hoes; J.L.M. Hensen

2014-01-01T23:59:59.000Z

27

Renewable generation and demand response integration in micro-grids: development of a new energy management and control system  

Science Journals Connector (OSTI)

The aim of this research resides in the development of an energy management and control system to control a micro-grid based on the use of renewable generation and demand resources to introduce the application of...

Carlos Álvarez-Bel; Guillermo Escrivá-Escrivá; Manuel Alcázar-Ortega

2013-11-01T23:59:59.000Z

28

PNNL: About - Environmental Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Policy. Pacific Northwest Division (PNWD) uses the International Organization for Standardization (ISO 14001) Environmental Management System (EMS) as a tool to manage, control,...

29

Management Control Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish requirements and responsibilities for the Department of Energy Management Control Program. Cancels DOE O 413.1. Canceled by DOE O 413.1B.

2002-04-18T23:59:59.000Z

30

Systems and methods for controlling energy use in a building management system using energy budgets  

DOE Patents [OSTI]

Systems and methods for limiting power consumption by a heating, ventilation, and air conditioning (HVAC) subsystem of a building are shown and described. A feedback controller is used to generate a manipulated variable based on an energy use setpoint and a measured energy use. The manipulated variable may be used for adjusting the operation of an HVAC device.

Wenzel, Michael J; Drees, Kirk H

2014-09-23T23:59:59.000Z

31

Direct Digital Control- A Tool for Energy Management of HVAC Systems  

E-Print Network [OSTI]

Direct digital control (DDC) applied to heating, ventilating, and air-conditioning (HVAC) systems corrects many of the deficiencies of conventional automatic temperature control systems. By applying new control sequences, DDC optimizes HVAC energy...

Swanson, K.

32

Object Management Systems  

E-Print Network [OSTI]

Object-Oriented Database Management Systems for EngineeringR. Cassel. Distribution Management Systems: Functions and8-PWR 1988. Network Management Systems 52 Subodh Bapat.

Gollu, Aleks Ohannes

1995-01-01T23:59:59.000Z

33

Environmental Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts...

34

Environmental Management System Plan  

E-Print Network [OSTI]

R-3 • Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

35

Virtual Control System Environment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Control System Environment Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin...

36

telecommunications system management  

Science Journals Connector (OSTI)

Communications system management applied to telecommunications systems, facilities, equipment, and components. See communications system , comm...

2001-01-01T23:59:59.000Z

37

Control-Based Load Shedding in Data Stream Management Systems Yi-Cheng Tu and Sunil Prabhakar  

E-Print Network [OSTI]

Control-Based Load Shedding in Data Stream Management Systems Yi-Cheng Tu and Sunil Prabhakar system overloading [6, 1]. The idea is to decrease the input load by discarding data tuples from cases of load arrivals. Example 1. As a very typical situation in streams, the incoming data rate may

Tu, Yicheng

38

Using Control Theory to Guide Load Shedding in Medical Data Stream Management System  

Science Journals Connector (OSTI)

The load shedding problem is vital to a Data Stream Management System (DSMS). This paper ... the design, implementation, and evaluation of a load shedding method under the guide of the ... is not so in a DSMS usi...

Zijing Hu; Hongyan Li; Baojun Qiu…

2005-01-01T23:59:59.000Z

39

Applications of interest : a relational database approach to managing control system software applications.  

SciTech Connect (OSTI)

Large accelerator facilities such as the Advanced Photon Source (APS) typically are operated by a diverse set of integrated control systems, such as front-end controllers, PLCs, and FPGAs. This type of control system structure encompasses numerous engineering documents, distributed real-time control system databases, source code, user displays, and other components. The complexity of the control system is further increased as the life cycle of a control system is never ending, change is constant. And the accelerator itself generates new operational problems on a regular basis. This overall controls environment begs the question of how best to provide a means for control system engineers to easily and quickly troubleshoot unique functions of the control system, find relevant information, and understand the impact of changes to one part of the control system on other applications. The answer to this question lies in being able to associate pertinent drawings, manuals, source code, hardware, and expert developers in an efficient and logical manner. Applications of Interest is a relational database software tool created for the purpose of providing alternative views of the supporting information behind each distinct control system application at the APS.

Quock, D. B.; Arnold, N.; Dohan, D.; Anderson, J.; Clemons, D. (APS Engineering Support Division)

2008-04-14T23:59:59.000Z

40

Investigation into the Interactions between thermal management, lubrication and control systems of a diesel engine.  

E-Print Network [OSTI]

??Engine thermal and lubricant systems have only recently been a serious focus in engine design and in general remain under passive control. The introduction of… (more)

Burke, Richard D

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

A Multi-agent System for Integrated Control and Asset Management of Petroleum Production Facilities -Part 2: Prototype  

E-Print Network [OSTI]

faulty instrumentation in real- world oil production plants, as indicated in table I. In the simulation outflow valve F10 Faulty three-phase separator gas outflow valve TABLE I OIL PRODUCTION FACILITYA Multi-agent System for Integrated Control and Asset Management of Petroleum Production Facilities

Taylor, James H.

42

Systems and methods for controlling energy use in a building management system using energy budgets  

SciTech Connect (OSTI)

Systems and methods for limiting power consumption by a heating, ventilation, and air conditioning (HVAC) subsystem of a building are shown and described. A mathematical linear operator is found that transforms the unused or deferred cooling power usage of the HVAC system based on pre-determined temperature settings to a target cooling power usage. The mathematical operator is applied to the temperature settings to create a temperature setpoint trajectory expected to provide the target cooling power usage.

Wenzel, Michael J.

2012-06-17T23:59:59.000Z

43

Management Control Cover  

Broader source: Energy.gov (indexed) [DOE]

Assess- Assess- ing Natural Resource Damage at Rocky Flats OAS-M-06-02 November 2005 REPORT ON MANAGEMENT CONTROLS OVER ASSESSING NATURAL RESUORCE DAMAGE AT ROCKY FLATS TABLE OF CONTENTS Natural Resource Damage Assessment at Rocky Flats Details of Finding 1 Recommendation and Comments 3 Appendices Objective, Scope, and Methodology 5 Prior Audit Reports 6 Management Comments 7 NATURAL RESURCE DAMAGE ASSESSMENT AT ROCKY FLATS Page 1 Details of Finding Natural Resource The Rocky Flats Project Office (Project Office) had not initiated, Damage Assessment and had no plans, at the time of our review, for conducting a Natural Resource Damage Assessment (NRDA) at the Rocky Flats

44

ControlBased Load Shedding in Data Stream Management Systems YiCheng Tu and Sunil Prabhakar  

E-Print Network [OSTI]

Control­Based Load Shedding in Data Stream Management Systems Yi­Cheng Tu and Sunil Prabhakar}@cs.purdue.edu Abstract Load shedding has been widely used in data stream man­ agement systems (DSMSs) as a means to maintain Quality­ of­Service (QoS) of data processing. However, current sys­ tems tend to adapt ad hoc

Tu, Yicheng

45

Modern Risk Control Techniques for Improving the Environmental Management System in Romanian HV Installations  

E-Print Network [OSTI]

Abstract Environmental protection keeps on being one of the main concerns of our company, together with the economic efficiency and providing of high quality energy services. The general goal of the environmental policy consists in improving the environmental management system and mitigating the power units ’ negative impact in compliance with the regulations in force. The specific goal accommodates the general goal to substations and electric lines, having as short and medium term target the compliance with the European requirements. As a result, more and more companies organise environmental studies and audits in order to evaluate their environmental performance. But such activities are not sufficient in themselves to provide the certainty that the performances comply to the regulation in force, and to the environment policy requirements. In order to become effective, these studies and audits have to be organised within a structured management, based on modern systems of global pollutants monitoring. These activities correspond to the ever stricter regulation and to the development of the economic policies and similar measures liable to stimulate environmental protection and the interest of the implied parties on environmental issues, sustainable development included. International standards on environmental management aim at providing the interested parties the fundamental elements of an environmental management

unknown authors

46

Environmental Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management System Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Managing our effects on the environment We are committed to protecting the environment while conducting our national security and energy-related missions. Laboratory Environmental Governing Policy What is the Environmental Management System? It covers every program in the Laboratory

47

Modeling, control, and power management of a power electrical system including two distributed generators based on fuel cell and supercapacitor  

Science Journals Connector (OSTI)

This paper focuses on Distributed Generator (DG) integration in Power Electrical System (PES) for dispersed nodes. The main objective of the DG use can be classified into two aspects: a load following service and ancillary service systems. In this study the DG system contains a Fuel cell and a Supercapacitor storage device. A gas turbine system is modeled in order to estimate the PES frequency behavior under a variable power demand. The main goal of this work is to develop a DG control strategy with the aim to smooth the frequency and the voltage peak variations. To assess the different management stages the power flow exchanged between DGs and PES is depicted and discussed for different power demand variations. The results found with the DGs integration strategy confirm the frequency and voltage regulations and also prove the well power flow management.

L. Krichen

2013-01-01T23:59:59.000Z

48

Management Control Cover  

Broader source: Energy.gov (indexed) [DOE]

Performance Fees in the Idaho Performance Fees in the Idaho National Laboratory Contract OAS-M-06-07 August 2006 REPORT ON MANAGEMENT CONTROLS OVER PERFORMANCE FEES IN THE IDAHO NATIONAL LABORATORY CONTRACT TABLE OF CONTENTS Performance Fees Details of Finding 1 Recommendations and Comments 4 Appendices 1. Objective, Scope, and Methodology 6 2. Other Matters 7 3. Related Audit Reports 8 4. Management Comments 9 PERFORMANCE FEES IN THE IDAHO NATIONAL LABORATORY CONTRACT Page 1 Details of Finding Performance Measures The Department of Energy (Department) did not always effectively and Fees use performance measures and fees to appropriately reward contractor performance. Specifically, the Department allocated approximately $1.1 million for 3 of the 27 performance measures

49

Fuzzy logic controller based power management for a standalone solar/wind/fuel cell fed hybrid system  

Science Journals Connector (OSTI)

This paper proposes a new power conditioner topology with an intelligent power management controller that integrates multiple renewable energy sources such as solar energy wind energy and fuel cell energy with battery backup to make the best use of their operating characteristics and obtain better reliability than that could be obtained by single renewable energy based power supply. The proposed multiple-input converter uses neural network and fuzzy logic controller for maintaining a constant voltage at point of common coupling and efficient power flow control respectively. The power conditioner uses very limited number of switches and promises significant savings in component count and reduced losses. Also fuzzy logic controller based online estimation of state of charge and battery charging is also designed for the battery bank which is suitably connected by the controller to sink or source the input power based on the load requirement. The simulation results of the proposed system prove good in the stability aspect as well.

S. Saravanan; S. Thangavel

2013-01-01T23:59:59.000Z

50

The Potential of Energy Management and Control Systems for Real-Time Electricity Pricing Programs  

E-Print Network [OSTI]

at critical periods of high demand, hoping that users will lower their demand. Increasing the customer load factor increases the overall system load factor and helps decrease the capital costs of supplied power. In this way, also, @eater system reliability.... The communications path for the transfer of the prices from the utility to the customer can take several forms. Most of the required software and hardware already exist in typical systems, or can be easily added. Sensor lnput f System Load Control Output 4...

Akbari, H.; Heinemeier, K. E.

1990-01-01T23:59:59.000Z

51

Management Control Cover  

Broader source: Energy.gov (indexed) [DOE]

the the Hanford Site Transuranic Mixed Tank Waste OAS-M-06-01 November 2005 REPORT ON MANAGEMENT CONTROLS OVER THE HANFORD SITE TRANSURANIC MIXED TANK WASTE TABLE OF CONTENTS Hanford Site Transuranic Mixed Tank Waste Details of Finding 1 Recommendations and Comments 3 Appendices Objective, Scope, and Methodology 6 Prior Audit Reports 8 Hanford Site Transuranaic Mixed Tank Waste Page 1 Details of Finding Regulation and The Office of River Protection (ORP) pursued the Transuranic Permits Mixed Tank (TRUM) Waste Project without sufficiently addressing regulatory and permitting issues. In 2003, ORP initiated efforts through its contractor, CH2M Hill Hanford Group, Inc. (CHG) to proceed with the TRUM waste project. According

52

Data quality assurance controls through the WIPP (Waste Isolation Pilot Plant) In Situ Data Acquisition, Analysis, and Management System  

SciTech Connect (OSTI)

Assurance of data quality for the in situ tests fielded at the Waste Isolation Pilot Plant is of critical importance. These tests supply the information for development and verification of the technology required for construction of a radioactive waste repository in bedded salt. The tests are some of the largest ever fielded in an underground facility. To assure that the extensive output generated by the tests is compatible with the high standards of quality required, a major project task was undertaken for the acquisition, control, and preservation of the all the associated in situ test databases, with the principal emphasis on the very large thermal/structural in situ tests. In order to accomplish this task the WIPP In Situ Data Acquisition, Analysis, and Management (WISDAAM) System was put into place. The system provides for quality control of the test databases and certified test data throughout the duration of the tests. 13 refs., 14 figs., 3 tabs.

Munson, D.E. (Sandia National Labs., Albuquerque, NM (USA)); Ball, J.R. (RE/SPEC, Inc., Albuquerque, NM (USA)); Jones, R.L. (Tech. Reps., Inc., Albuquerque, NM (USA))

1990-08-01T23:59:59.000Z

53

Computerized Maintenance Management Systems  

Broader source: Energy.gov [DOE]

Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

54

Trends in Energy Management Technology - Part 3: State of Practice of Energy Management, Control, and Information Systems  

E-Print Network [OSTI]

Controls Vendors Automated Logic Alerton TechnologiesWeb Services. One vendor, Automated Logic, is planning toFor example in WebCTRL (Automated Logic), devices can have

Yee, Gaymond; Webster, Tom

2004-01-01T23:59:59.000Z

55

Change Control Management Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide provides a suggested approach and uniform guidance for managing project and contract changes through applying the requirements of DOE O 413.3B. No cancellation.

2011-07-29T23:59:59.000Z

56

Cost reduction performance enhancements of multiple site cooling water systems, enabled by remote system monitoring/control and multifaceted data management  

SciTech Connect (OSTI)

An outsourced cooling water treatment automated control and data acquisition package, has been designed, installed, and commissioned in over 70 sites in North America and offshore. The standard package consists of a controller, sensors, human-machine interface software, data acquisition and management software, communications, and reporting. Significant challenges to applying this standard package in multiple sites arose from variations in cooling system design and makeup water quality as well as operations, environmental considerations, metrics, and language. A standard approach has met these challenges and overcome effects of downsizing through significant reduction in non-value-added, manual activities. Overall system reliability has been improved by migration to best practice throughout the organizations involved and immediate proactive response to out-of-specification conditions. This paper documents the evolution of a standard cooling water automation and data management package from its inception to current practice.

Cook, B. [BetzDearborn Water Management Group, Horsham, PA (United States); Young, D. [BetzDearborn Water Management Group, Mississauga, Ontario (Canada); Tari, K. [Praxair, Inc., Tonawanda, New York, NY (United States)

1998-12-31T23:59:59.000Z

57

Operating System Resource Management  

E-Print Network [OSTI]

Operating System Resource Management Date: Monday, September 27, 2010 Time: 2:00 ­ 3:00 pm Location allocation and de-allocation by an operating system of processor cores, memory pages, and various types constrained. This talk will propose a scheme for addressing the operating system resource management problem

58

Energy Management Systems  

E-Print Network [OSTI]

This presentation will address results from a pilot project with 10 chemical plants on energy management systems and the development of an energy efficiency plant certification program....

Ferland, K.

2007-01-01T23:59:59.000Z

59

Comprehensive Emergency Management System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes policy and assigns roles and responsibilities for the Department of Energy (DOE) Emergency Management System. Cancels DOE O 151.1B.

2005-11-02T23:59:59.000Z

60

Business System Management Review  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

P-004 Business System Management Review Process 11_0304Page 1 of 7 P-004 Business System Management Review Process 11_0304Page 1 of 7 EOTA - Business Process Document Title: Business System Management Review Process Document Number: P-004 Rev 11_0304 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): F-009, Business System Management Review Template P-004 Business System Management Review Process 11_0304Page 2 of 7 Revision History: Rev. Description of Change A Initial Release 08_0414 Corrective Actions, Preventive Actions, and Improvement Opportunity 09_1124 Edited document for clarity and to better fit the process in use. Added requirement to provide management with

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Managing manure and conserving predators helps control flies in caged-layer poultry systems  

E-Print Network [OSTI]

Leaving undisturbed ma- nure (with a larger number ofand Arends 1990). Fresh ma- nure is rich in nutrients and isthan any other factor, ma- nure management dictaies the type

Mullens, Bradley A.; Hinkle, Nancy C.; Szijj, Coralie E.; Kuney, Douglas R.

2001-01-01T23:59:59.000Z

62

The Ural Electrochemical Integrated Plant Process for Managing Equipment Intended for Nuclear Material Protection, Control and Accounting System Upgrades  

SciTech Connect (OSTI)

Since 1996, the Ural Electrochemical Integrated Plant (UEIP) located in the town of Novouralsk, Russia, (previously known as Sverdlovsk-44) and the United States Department of Energy (U.S. DOE) have been cooperating under the Nuclear Material Protection, Control and Accounting (MPC&A) Program. Because UEIP is involved in the processing of highly enriched uranium (HEU) into low enriched uranium (LEU), and there are highly enriched nuclear materials on its territory, the main goal of the MPC&A cooperation is to upgrade those systems that ensure secure storage, processing and transportation of nuclear materials at the plant. UEIP has completed key upgrades (equipment procurement and installation) aimed at improving MPC&A systems through significant investments made by both the U.S. DOE and UEIP. These joint cooperative efforts resulted in bringing MPC&A systems into compliance with current regulations, which led to nuclear material (NM) theft risk reduction and prevention from other unlawful actions with respect to them. Upon the U.S. MPC&A project team’s suggestion, UEIP has developed an equipment inventory control process to track all the property provided through the MPC&A Program. The UEIP process and system for managing equipment provides many benefits including: greater ease and efficiency in determining the quantities, location, maintenance and repair schedule for equipment; greater assurance that MPC&A equipment is in continued satisfactory operation; and improved control in the development of a site sustainability program. While emphasizing UEIP’s equipment inventory control processes, this paper will present process requirements and a methodology that may have practical and helpful applications at other sites.

Yuldashev, Rashid; Nosov, Andrei; Carroll, Michael F.; Garrett, Albert G.; Dabbs, Richard D.; Ku, Esther M.

2008-10-01T23:59:59.000Z

63

Interface and control manager for parcels sorting  

Science Journals Connector (OSTI)

The paper presents the development of an Interface and Control Manager (ICM) intended to sort automatically parcels in Swiss POST. The main purpose of the ICM is to replace existing IBM sorting system, providing better sorting quality. ICM uses complete ... Keywords: RTOS-Scheduling, multithreading, object- oriented programming, parallel systems

Atanas Atanassov

2004-06-01T23:59:59.000Z

64

Managing the Management: CORBAbased Instrumentation of Management Systems  

E-Print Network [OSTI]

Management Team Department of Computer Science, TU MË? unchen Arcisstr. 21, D­80333 Munich, Germany akeller approach to this problem by defining a MIB for manage­ ment systems. It can be regarded as a step towardsManaging the Management: CORBA­based Instrumentation of Management Systems A. Keller Munich Network

65

Integrating Management Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mission Execution by Mission Execution by Integrating our Management Systems Integrating our Management Systems 1 W e e k l y O p e r a t i o n s M e e t i n g N o v e m b e r 1 , 2 0 1 1 M i c h a e l J . W e i s Pulling the Pieces Together for Improving DOE Management to Enable Mission Execution 2 ï‚— Process changes Process changes ï‚— Behavioral changes Behavioral changes ï‚— System changes System changes Process Change Approach Strengthening and Expediting Decision Making 3 Proposed Outcomes Horizontal Integration Incoming DOE Business Crosscutting Issues (i.e. NLDC input) Hi-level Roadblocks Operations Management Council Associate Deputy Secretary Collaborative Action Process Chief Operating Officer Weekly Operations Council (OMC) Super 8 Secretary (ADS) (CAP) Board (COOB) p Meeting Endorsement / Commitment Super 8 US Meetings COO Meetings

66

Environmental Management System Plan  

E-Print Network [OSTI]

Water Discharges) of Introduction Environmental Managementmanagement Water conservation LBNL’s approach to sustainable environmentalEnvironmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: Protect the air, water,

Fox, Robert

2009-01-01T23:59:59.000Z

67

Management Control Cover  

Broader source: Energy.gov (indexed) [DOE]

BWXT's Teaming Partner BWXT's Teaming Partner Arrangement at Pantex OAS-M-06-04 February 2006 2 approval and BWXT reimbursed the parent company of Bechtel, Bechtel National, for indirect costs in excess of contract limits. This occurred because the Pantex Site Office did not: 1) ensure that BWXT complied with contractual provisions that limited post-retirement health benefits to BWXT employees, and 2) implement adequate controls to mitigate potential conflict of interest situations involving purchases from Bechtel National and affiliates. As a result, the Department was at risk of paying $3 million in post-retirement health benefits for individuals who were ineligible for the benefits. Additionally, the Department has reimbursed BWXT approximately $90,000 for questionable costs associated with indirect charges made by Bechtel National.

68

Optimal Control Theory for Sustainable Environmental Management  

Science Journals Connector (OSTI)

Although optimization leading to time-independent decisions is a well established decision-making technique, such decisions might be suboptimal for natural systems, as they ignore the inherent dynamic characteristics of these systems. ... Therefore, an effective approach is to use control theory to derive time-dependent management decisions. ... This is decided using the results from the PRCC analysis and also based on the dynamics of the uncontrolled system. ...

Yogendra Shastri; Urmila Diwekar; Heriberto Cabezas

2008-06-14T23:59:59.000Z

69

Federal Energy Management Program: Lighting Control Types  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lighting Control Lighting Control Types to someone by E-mail Share Federal Energy Management Program: Lighting Control Types on Facebook Tweet about Federal Energy Management Program: Lighting Control Types on Twitter Bookmark Federal Energy Management Program: Lighting Control Types on Google Bookmark Federal Energy Management Program: Lighting Control Types on Delicious Rank Federal Energy Management Program: Lighting Control Types on Digg Find More places to share Federal Energy Management Program: Lighting Control Types on AddThis.com... Energy-Efficient Products Federal Requirements Covered Product Categories Product Designation Process Low Standby Power Energy & Cost Savings Calculators Model Acquisitions Language Working Group Resources Technology Deployment Renewable Energy

70

Real-Time Distribution Feeder Performance Monitoring, Advisory Control, and Health Management System  

SciTech Connect (OSTI)

New data collection system equipment was installed in Xcel Energy substations and data was collected from 6 substations and 20 feeders. During Phase I, ABB collected and analyzed 793 real-time events to date from 6 Xcel Energy substations and continues today. The development and integration of several applications was completed during the course of this project, including a model-based faulted segment identification algorithm, with very positive results validated with field-gathered data discussed and included in this report. For mostly underground feeders, the success rate is 90% and the overreach rate is 90%. For mostly overhead feeders, the success rate is 74% and the overreach rate is 50%. The developed method is producing very accurate results for mostly underground feeders. For mostly overhead feeders, due to the bad OMS data quality and varying fault resistance when arcing, the developed method is producing good results but with much room for improvement. One area where the algorithm can be improved is the accuracy for sub-cycle fault events. In these cases, the accuracy of the conventional signal processing methods suffers due to most of these methods being based on a one-cycle processing window. By improving the signal processing accuracy, the accuracy of the faulted segment identification algorithm will also improve significantly. ABB intends to devote research in this area in the near future to help solve this problem. Other new applications developed during the course of the project include volt/VAR monitoring, unbalanced capacitor switching detection, unbalanced feeder loading detection, and feeder overloading detection. An important aspect of the demonstration phase of the project is to show the ability to provide adequate “heads-up” time ahead of customer calls or AMI reports so that the operators are provided with the much needed time to collect information needed to address an outage. The advance notification feature of the demonstration system provides this time and helps accelerate service restoration ultimately. To demonstrate the effectiveness of this feature, a demo system using substation data alone was set up to compare the minutes saved over a period of 22 months for two feeders where the real-time notification system has been deployed. The metric used for performance assessment is the time difference between the actual outage time from the OMS versus the time the notification email was received on the operators desk. Over the period of 22 months, we have accumulated over 7600 minutes (32 hours) ahead of actual outage time compared to the OMS timestamps. The significance of this analysis is that it shows the potential to reduce the SAIDI minutes and directly impact utility performance in terms of outage duration. If deployed at scale, it would have a significant impact on system reliability. To put this number in perspective, it would be helpful to assign a dollar figure to the potential savings that could be realized. According to the host utility, the average cost for each customer-minute-out (CMO) is approximately $0.30 across the operating company. This includes both direct and indirect costs such as bad press. The outage data over the previous 4 years show that the average customer count on primary/tap level outages is about 56. Accordingly, the total minutes saved amounts to 425,600 CMOs on the average. This would in turn result in a potential cost savings figure of $127,680 for two feeders alone over the period of performance. This empirical evidence validates the strong value proposition of the project that was contemplated at the onset and its potential impact to reduce outage duration in support of DOE’s goal of 20%

Stoupis, James; Mousavi, Mirrasoul

2014-09-30T23:59:59.000Z

71

Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project, July 2011  

Broader source: Energy.gov (indexed) [DOE]

Independent Review of Independent Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project July 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ......................................................................................................................................1 2.0 Scope .........................................................................................................................................1 3.0 Background ...............................................................................................................................2

72

Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project, July 2011  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Independent Review of Independent Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project July 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ......................................................................................................................................1 2.0 Scope .........................................................................................................................................1 3.0 Background ...............................................................................................................................2

73

Purge water management system  

DOE Patents [OSTI]

A purge water management system is described for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

Cardoso-Neto, J.E.; Williams, D.W.

1995-01-01T23:59:59.000Z

74

Application of Management Frameworks: A Case Study on Managing Workflow related Systems  

E-Print Network [OSTI]

Application of Management Frameworks: A Case Study on Managing Workflow related Systems Srinath management of a system involves much more complexities than just closing the control loop by implementing management usecase for managing workflow related systems using Hasthi, a ro- bust, scalable, and distributed

Plale, Beth

75

NIM (NERSC Information Management) system  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NERSC Information Management (NIM) portal The NERSC Information Management (NIM) system is a web portal used to view and modify user account, usage, and allocations information....

76

Thermal Control & System Integration  

Broader source: Energy.gov [DOE]

The thermal control and system integration activity focuses on issues such as the integration of motor and power control technologies and the development of advanced thermal control technologies....

77

Air management in a diesel engine using fuzzy control techniques  

Science Journals Connector (OSTI)

Air management for diesel engines is a major challenge from the control point of view because of the highly nonlinear behavior of this system. For this reason, linear control techniques are unable to provide the required performance, and nonlinear controllers ... Keywords: Diesel engines, Fuzzy systems, Identification, LMIs, Nonlinear control

S. García-Nieto; J. Salcedo; M. Martínez; D. Laurí

2009-09-01T23:59:59.000Z

78

Power management system  

DOE Patents [OSTI]

A method of managing power resources for an electrical system of a vehicle may include identifying enabled power sources from among a plurality of power sources in electrical communication with the electrical system and calculating a threshold power value for the enabled power sources. A total power load placed on the electrical system by one or more power consumers may be measured. If the total power load exceeds the threshold power value, then a determination may be made as to whether one or more additional power sources is available from among the plurality of power sources. At least one of the one or more additional power sources may be enabled, if available.

Algrain, Marcelo C. (Peoria, IL); Johnson, Kris W. (Washington, IL); Akasam, Sivaprasad (Peoria, IL); Hoff, Brian D. (East Peoria, IL)

2007-10-02T23:59:59.000Z

79

Regulatory software configuration management system design  

Science Journals Connector (OSTI)

The gap between nuclear safety-related regulations and the commercial software configuration management causes software quality concerns for Digital Control and Information System (DCIS) of a nuclear power plant. The main reason is that the DCIS of a ...

I-Hsin Chou; Chin-Feng Fan

2006-09-01T23:59:59.000Z

80

Training Management Information System  

SciTech Connect (OSTI)

The Training Management Information System (TMIS) is an integrated information system for all training related activities. TMIS is at the leading edge of training information systems used in the nuclear industry. The database contains all the necessary records to confirm the department's adherence to accreditation criteria and houses all test questions, student records and information needed to evaluate the training process. The key to the TMIS system is that the impact of any change (i.e., procedure change, new equipment, safety incident in the commercial nuclear industry, etc.) can be tracked throughout the training process. This ensures the best training can be performed that meets the needs of the employees. TMIS is comprised of six functional areas: Job and Task Analysis, Training Materials Design and Development, Exam Management, Student Records/Scheduling, Evaluation, and Commitment Tracking. The system consists of a VAX 6320 Cluster with IBM and MacIntosh computers tied into an ethernet with the VAX. Other peripherals are also tied into the system: Exam Generation Stations to include mark sense readers for test grading, Production PC's for Desk-Top Publishing of Training Material, and PC Image Workstations. 5 figs.

Rackley, M.P.

1989-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Control system design method  

DOE Patents [OSTI]

A control system design method and concomitant control system comprising representing a physical apparatus to be controlled as a Hamiltonian system, determining elements of the Hamiltonian system representation which are power generators, power dissipators, and power storage devices, analyzing stability and performance of the Hamiltonian system based on the results of the determining step and determining necessary and sufficient conditions for stability of the Hamiltonian system, creating a stable control system based on the results of the analyzing step, and employing the resulting control system to control the physical apparatus.

Wilson, David G. (Tijeras, NM); Robinett, III, Rush D. (Tijeras, NM)

2012-02-21T23:59:59.000Z

82

Environmental Compliance Management System  

SciTech Connect (OSTI)

Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy.

Brownson, L.W.; Krsul, T.; Peralta, R.A. [Argonne National Lab., Idaho Falls, ID (United States); Knudson, D.A.; Rosignolo, C.L. [Argonne National Lab., IL (United States)

1992-09-01T23:59:59.000Z

83

SES Performance Management System Plan Training | Department...  

Broader source: Energy.gov (indexed) [DOE]

Management System Plan Training SES Performance Management System Plan Training Overview of the DOE SES Performance Management System. Senior Executive Service Performance...

84

Mobile Traffic Management System Test Deployment  

E-Print Network [OSTI]

BERKELEY Mobile Traf?c Management System Test DeploymentHIGHWAYS MOBILE TRAFFIC MANAGEMENT SYSTEM TEST DEPLOYMENTMobile Transportation Management System (MTMS). This new and

Gerfen, Jeffrey Brian

2005-01-01T23:59:59.000Z

85

PIA - Human Resources Management Information System (HRMIS) ...  

Energy Savers [EERE]

Information System (HRMIS) PIA - Human Resources Management Information System (HRMIS) PIA - Human Resources Management Information System (HRMIS) PIA - Human Resources Management...

86

Crawling the Control System  

SciTech Connect (OSTI)

Information about accelerator operations and the control system resides in various formats in a variety of places on the lab network. There are operating procedures, technical notes, engineering drawings, and other formal controlled documents. There are programmer references and API documentation generated by tools such as doxygen and javadoc. There are the thousands of electronic records generated by and stored in databases and applications such as electronic logbooks, training materials, wikis, and bulletin boards and the contents of text-based configuration files and log files that can also be valuable sources of information. The obvious way to aggregate all these sources is to index them with a search engine that users can then query from a web browser. Toward this end, the Google "mini" search appliance was selected and implemented because of its low cost and its simple web-based configuration and management. In addition to crawling and indexing electronic documents, the appliance provides an API that has been used to supplement search results with live control system data such as current values of EPICS process variables and graphs of recent data from the archiver.

Theodore Larrieu

2009-10-01T23:59:59.000Z

87

Electric Power Controller for Steering Wheel Management in Electric Cars  

E-Print Network [OSTI]

Electric Power Controller for Steering Wheel Management in Electric Cars Vicente Milanés, Joshué-- Autonomous vehicles, Power control, System analysis and design, Intelligent transportation systems. I they are named hydraulic power steering (HPS) systems. If an electric motor is used then they are named electric

Paris-Sud XI, Université de

88

Earned Value Management System (EVMS)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide supports the Departments initiatives to improve program, project, and contract management through the implementation and surveillance of contractors earned value management systems. Canceled by DOE G 413.3-10A.

2008-05-06T23:59:59.000Z

89

HIERARCHICAL MANAGEMENT OF BATTLEFIELD NETWORKS WITH THE SHAMAN MANAGEMENT SYSTEM  

E-Print Network [OSTI]

HIERARCHICAL MANAGEMENT OF BATTLEFIELD NETWORKS WITH THE SHAMAN MANAGEMENT SYSTEM Adarshpal S with a description of the SHAMAN system and briefly introduces its applica- tions to the management of tactical for MANagement). This management system developed at the Network Management Laboratory of the Univer- sity

Sethi, Adarshpal

90

Cryptographic Key Management System  

SciTech Connect (OSTI)

This report summarizes the outcome of U.S. Department of Energy (DOE) contract DE-OE0000543, requesting the design of a Cryptographic Key Management System (CKMS) for the secure management of cryptographic keys for the energy sector infrastructure. Prime contractor Sypris Electronics, in collaboration with Oak Ridge National Laboratories (ORNL), Electric Power Research Institute (EPRI), Valicore Technologies, and Purdue University's Center for Education and Research in Information Assurance and Security (CERIAS) and Smart Meter Integration Laboratory (SMIL), has designed, developed and evaluated the CKMS solution. We provide an overview of the project in Section 3, review the core contributions of all contractors in Section 4, and discuss bene#12;ts to the DOE in Section 5. In Section 6 we describe the technical construction of the CKMS solution, and review its key contributions in Section 6.9. Section 7 describes the evaluation and demonstration of the CKMS solution in different environments. We summarize the key project objectives in Section 8, list publications resulting from the project in Section 9, and conclude with a discussion on commercialization in Section 10 and future work in Section 11.

No, author

2014-02-21T23:59:59.000Z

91

2012 SG Peer Review - Real-Time Distribution Feed Performance Monitoring, Advisory Control, and Health Management System - James Stoupis, ABB Inc.  

Broader source: Energy.gov (indexed) [DOE]

Real-Time Distribution Feeder Performance Real-Time Distribution Feeder Performance Monitoring, Advisory Control, and Health Management System James Stoupis ABB Inc., US Corporate Research Center June 7, 2012 December 2008 Real-Time Distribution Feeder Performance Monitoring Objective Life-cycle Funding Summary ($K) Prior to FY 12 FY12, authorized FY13, requested Out-year(s) $200 k $1.1 M $1.3 M $400k Technical Scope To innovatively leverage advanced sensing, monitoring, and control technologies to enhance asset utilization and grid reliability Install state-of-the-art data collection, monitoring, and sensing equipment in distribution substations and on distribution feeders Develop new feeder monitoring, advisory control, and asset health applications deployed on current circuits, and future circuits with DERs

92

System Optimization - The Global Approach to HVAC Control  

E-Print Network [OSTI]

System Optimization is a new approach to HVAC control as implemented by Energy Management Control Systems. System Optimization is defined as electronic building control strategies which treat a building's HVAC components as a complete energy...

Thielman, D. E.

1984-01-01T23:59:59.000Z

93

Automated Transportation Management System (ATMS) | Department...  

Office of Environmental Management (EM)

of Energy's (DOE's) Automated Transportation Management System is an integrated web-based logistics management system allowing users to manage inbound and outbound freight...

94

Knowledge Management and Assistance Systems  

E-Print Network [OSTI]

1 1 Knowledge Management and Assistance Systems Bernd Neumann WS 2007/08 2 Topics Introduction Applications of Knowledge-based Systems Role of Knowledge Management Knowledge Representation Techniques Semantic Networks Relational Structures Frame-based Knowledge Representation Rule-based Systems Case

Hamburg,.Universität

95

Environmental Management System Plan  

E-Print Network [OSTI]

management Water conservation LBNL’s approach to sustainable environmentalWater Discharges) of Introduction Environmental Managementenvironmental compliance programs, such as air and water quality, as well as less traditional programs, such as wildland fire management,

Fox, Robert

2009-01-01T23:59:59.000Z

96

Microsoft Word - Management Control Cover1.doc  

Broader source: Energy.gov (indexed) [DOE]

the the Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2006 OAS-M-06-10 September 2006 Department of Energy Washington, DC 20585 September 25, 2006 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATO Y COMMISSION , -x, FROM: Rickey k. ~ a k Assistant Inspector General for Financial, Technology and Corporate Audits Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Management Controls over the Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2006" BACKGROUND The Federal Energy Regulatory Commission (Commission) has developed and implemented a number of information systems to support its mission of regulating the

97

Legal Management Tracking System Page  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Legal Management Tracking System Page 1 of 1 Back to Case Costs Contractor Litigation - Law Firm Invoices Office: Richland Operations Office Parties: DWAYNE HALL v. FLUOR HANFORD,...

98

System for Award Management (SAM):  

Energy Savers [EERE]

System for Award Management (SAM) ChallengeHER Opportunities for Women in Federal Contracting May 23, 2013 Judith R. Zawatsky General Services Administration You are here today...

99

Earned Value Management System (EVMS)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides approaches for implementing the Earned Value Management System (EVMS) requirements of DOE O 413.3B. Cancels DOE G 413.3-10.

2012-03-13T23:59:59.000Z

100

INL's Environmental Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and minimize environmental impacts throughout the lifecycle of INL facilities and operations. Conduct all activities and manage hazardous and radioactive materials and...

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Project Management vs. Systems Engineering Management: A Practitioners' View on  

E-Print Network [OSTI]

Project Management vs. Systems Engineering Management: A Practitioners' View on IntegratingPROJECT MANAGEMENT VS. SYSTEMS ENGINEERING MANAGEMENT Received 3 August 2010; Revised 18 December 2010 (wileyonlinelibrary.com). DOI 10.1002/sys.20187 ABSTRACT While most Systems Engineering Management (SEM) applications

de Weck, Olivier L.

102

A user interface management system  

Science Journals Connector (OSTI)

The design and construction of the user interface to interactive systems is receiving increased attention. This paper describes a user interface management system that allows a designer/developer to focus on the logical functionality of an application ... Keywords: User interface management

David J. Kasik

1982-07-01T23:59:59.000Z

103

Proton beam therapy control system  

DOE Patents [OSTI]

A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.

Baumann, Michael A. (Riverside, CA); Beloussov, Alexandre V. (Bernardino, CA); Bakir, Julide (Alta Loma, CA); Armon, Deganit (Redlands, CA); Olsen, Howard B. (Colton, CA); Salem, Dana (Riverside, CA)

2008-07-08T23:59:59.000Z

104

Proton beam therapy control system  

DOE Patents [OSTI]

A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.

Baumann, Michael A. (Riverside, CA); Beloussov, Alexandre V. (San Bernardino, CA); Bakir, Julide (Alta Loma, CA); Armon, Deganit (Longmeadow, MA); Olsen, Howard B. (Irvine, CA); Salem, Dana (Riverside, CA)

2010-09-21T23:59:59.000Z

105

Proton beam therapy control system  

DOE Patents [OSTI]

A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.

Baumann, Michael A; Beloussov, Alexandre V; Bakir, Julide; Armon, Deganit; Olsen, Howard B; Salem, Dana

2013-06-25T23:59:59.000Z

106

Fuel cell gas management system  

DOE Patents [OSTI]

A fuel cell gas management system including a cathode humidification system for transferring latent and sensible heat from an exhaust stream to the cathode inlet stream of the fuel cell; an anode humidity retention system for maintaining the total enthalpy of the anode stream exiting the fuel cell equal to the total enthalpy of the anode inlet stream; and a cooling water management system having segregated deionized water and cooling water loops interconnected by means of a brazed plate heat exchanger.

DuBose, Ronald Arthur (Marietta, GA)

2000-01-11T23:59:59.000Z

107

Business System Management Review Template  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

F-009 Business System Management Review Template 09_0519 Page 1 of 12 F-009 Business System Management Review Template 09_0519 Page 1 of 12 Company - Business Form Document Title: Business System Management Review Template Document Number: F-009 Rev. 11_0628 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-004, Business System Management Review Notify of Changes: QAM, MGT Referenced Document(s): N/A F-009 Business System Management Review Template 09_0519 Page 2 of 12 Revision History: Rev. Description of Change A Initial Release 09_0519 Format changes made to template (in particular Section 7.0 CAR/PAR/IO reporting) and several edits for clarification and ease of reading. 11_0628 Modified template categories to reflect current process

108

Integrated Building Management System (IBMS) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Building Management System Building Management System (IBMS) Integrated Building Management System (IBMS) The U.S. Department of Energy (DOE) is currently conducting research into an integrated building management system (IBMS). Project Description This project seeks to develop an open integration framework that allows multivendor systems to interoperate seamlessly using internet protocols. The applicant will create an integrated control platform for implementing new integrated control strategies and to enable additional enterprise control applications, such as demand response. The project team seeks to develop several strategies that take advantage of the sensors and functionality of heating, ventilation, and air conditioning (HVAC); security; and information and communication technologies (ICT) subsystems;

109

Wide-Area Energy Storage and Management system to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas  

SciTech Connect (OSTI)

The entire project addresses the issue of mitigating additional intermittency and fast ramps that occur at higher penetration of intermittent resources, including wind genera-tion, in the Bonneville Power Administration (BPA) and the California Independent Sys-tem Operator (California ISO) control areas. The proposed Wide Area Energy Storage and Management System (WAEMS) will address the additional regulation requirement through the energy exchange between the participating control areas and through the use of energy storage and other generation resources. For the BPA and California ISO control centers, the new regulation service will look no different comparing with the traditional regulation resources. The proposed project will benefit the regulation service in these service areas, regardless of the actual degree of penetration of the intermittent resources in the regions. The project develops principles, algorithms, market integration rules, functional de-sign and technical specifications for the WAEMS system. The project is sponsored by BPA and supported in kind by California ISO, Beacon Power Corporation, and the Cali-fornia Energy Commission (CEC).

Makarov, Yuri V.; Yang, Bo; DeSteese, John G.; Lu, Shuai; Miller, Carl H.; Nyeng, Preben; Ma, Jian; Hammerstrom, Donald J.; Vishwanathan, Vilanyur V.

2008-06-30T23:59:59.000Z

110

Development of an Integrated Distribution Management System  

SciTech Connect (OSTI)

This final report details the components, functionality, costs, schedule and benefits of developing an Integrated Distribution Management System (IDMS) for power distribution system operation. The Distribution Automation (DA) and Supervisory Control and Data Acquisition (SCADA) systems used by electric power companies to manage the distribution of electric power to retail energy consumers are vital components of the Nation’s critical infrastructure. Providing electricity is an essential public service and a disruption in that service, if not quickly restored, could threaten the public safety and the Nation’s economic security. Our Nation’s economic prosperity and quality of life have long depended on the essential services that utilities provide; therefore, it is necessary to ensure that electric utilities are able to conduct their operations safely and efficiently. A fully integrated technology of applications is needed to link various remote sensing, communications and control devices with other information tools that help guide Power Distribution Operations personnel. A fully implemented IDMS will provide this, a seamlessly integrated set of applications to raise electric system operating intelligence. IDMS will enhance DA and SCADA through integration of applications such as Geographic Information Systems, Outage Management Systems, Switching Management and Analysis, Operator Training Simulator, and other Advanced Applications, including unbalanced load flow and fault isolation/service restoration. These apps are capable of utilizing and obtaining information from appropriately installed DER, and by integrating disparate systems, the Distribution Operators will benefit from advanced capabilities when analyzing, controlling and operating the electric system.

Schatz, Joe E.

2010-10-20T23:59:59.000Z

111

Building sustainable energy systems: Homeostatic control of grid-connected microgrids, as a means to reconcile power supply and energy demand response management  

Science Journals Connector (OSTI)

Abstract The issue of worldwide over consumption and squandering of electrical energy has resulted in what one might call an energy obesity problem in terms of energy intake and its expenditure. It is indeed something that must change if modern society is to become sustainable someday. This is to be realized in conjunction with adequate government policies and innovative strategies aimed at effectively integrating non-conventional renewable energies (NCRE), with thriftiness and energy efficiency (EE) – the three pillars of energy sustainability (ES) – in today?s electric power systems generation and distribution infrastructure. This ought to be done in a way that incorporates them jointly, as part of a comprehensive energy strategy to propitiate a wider penetration of distributed generation (DG) solutions. Departing from mainstream literature on the subject, this paper proposes such strategies for integrating hybrid micro-generation power systems to the grid through homeostatic control (HC), as a means to reconcile power supply and energy demand response management (EDRM). These strategies can be designed and implemented in the microgrid?s supervisory control system for the purpose of eliciting EE and thriftiness in consumers to build ES in the system. The theoretical model behind the HC strategies is presented and a numerical example is provided, using real electricity consumption data of a small rural community in Chile. Upon examining a particular set of criteria designed to control renewable power (RP) supply from a grid-tie microgrid to residential consumers, simulation results show that the model proves effective when testing such criteria for different power supply scenarios. Particularly revealing is the role of the energy storage system (ESS) – the energy buffer – in the HC strategies being proposed and the difference that it makes in eliciting thrifty, efficient energy consumption as a result of individual and collective efforts to ensure energy sustainability of the system as a whole.

Franco Fernando Yanine; Federico I. Caballero; Enzo E. Sauma; Felisa M. Córdova

2014-01-01T23:59:59.000Z

112

Safety Management System Policy  

Broader source: Energy.gov (indexed) [DOE]

POLICY POLICY Washington, D.C. Approved: 4-25-11 SUBJECT: INTEGRATED SAFETY MANAGEMENT POLICY PURPOSE AND SCOPE To establish the Department of Energy's (DOE) expectation for safety, 1 including integrated safety management that will enable the Department's mission goals to be accomplished efficiently while ensuring safe operations at all departmental facilities and activities. This Policy cancels and supersedes DOE Policy (P) 411.1, Safety Management Functions, Responsibilities, and Authorities Policy, dated 1-28-97; DOE P 441.1, DOE Radiological Health and Safety Policy, dated 4-26-96; DOE P 450.2A, Identifying, Implementing and Complying with Environment, Safety and Health Requirements, dated 5-15-96; DOE P 450.4, Safety Management

113

Earned Value Management System RM  

Broader source: Energy.gov (indexed) [DOE]

Earned Value Management System Review Module Earned Value Management System Review Module March 2010 CD-0 O Ea 0 OFFICE OF arned Va C CD-1 F ENVIRO Standard R alue Man Rev Critical Decis CD-2 M ONMENTAL Review Plan agement view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) t System e pplicability D-3 EMENT (EVMS) CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

114

Integrated pest management: the push–pull approach for controlling insect pests and weeds of cereals, and its potential for other agricultural systems including animal husbandry  

Science Journals Connector (OSTI)

...integrated pest management Clearly, by...hypothesis-driven science, new technologies...expression, this approach could help to...parasitic wasps. Science. 250, 1251-1253...10.1126/science.250.4985...integrated pest management and chemical...the push-pull approach for controlling...

2008-01-01T23:59:59.000Z

115

Federal Energy Management Program: Metering Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Metering Systems Metering Systems to someone by E-mail Share Federal Energy Management Program: Metering Systems on Facebook Tweet about Federal Energy Management Program: Metering Systems on Twitter Bookmark Federal Energy Management Program: Metering Systems on Google Bookmark Federal Energy Management Program: Metering Systems on Delicious Rank Federal Energy Management Program: Metering Systems on Digg Find More places to share Federal Energy Management Program: Metering Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Systems Approaches Process Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources Contacts Greenhouse Gases Water Efficiency

116

Towards CORBAbased Enterprise Management: Managing CORBAbased Systems with SNMP Platforms  

E-Print Network [OSTI]

1 Towards CORBA­based Enterprise Management: Managing CORBA­based Systems with SNMP Platforms are in widespread use. The consen­ sus on the advantages of CORBA for managing complex system infrastuctures distributed object environments. Keywords--- CORBA, Enterprise Management, SNMP Platforms, Distributed Systems

117

Energy Management and Information Systems  

E-Print Network [OSTI]

?infrastructure energy?audits,?HVAC?upgrades,? heat?recovery,?etc. Improve?operations processes?and?day?to?day? operations,?retro? commissioning ENERGY?MANAGEMENT?INFORMATION?SYSTEM the?project Hardware ? $3.0?million?investment ? 400+?meters...

Conraud, J.

2013-01-01T23:59:59.000Z

118

Integrated Safety Management System Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This manual provides requirements and guidance for DOE and contractors to ensure development and implementation of an effective Integrated Safety Management system that is periodically reviewed and continuously improved. Canceled by DOE O 450.2.

2006-11-01T23:59:59.000Z

119

System and method for advanced power management  

DOE Patents [OSTI]

A power management system is provided that includes a power supply means comprising a plurality of power supply strings, a testing means operably connected to said plurality of power supply strings for evaluating performance characteristics of said plurality of power supply strings, and a control means for monitoring power requirements and comprising a switching means for controlling switching of said plurality of power supply strings to said testing means.

Atcitty, Stanley (Albuquerque, NM); Symons, Philip C. (Surprise, AZ); Butler, Paul C. (Albuquerque, NM); Corey, Garth P. (Albuquerque, NM)

2009-07-28T23:59:59.000Z

120

Environmental Management System Steering Committee | The Ames...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Management System Steering Committee The Environmental Management System Steering Committee (EMSSC) is a standing Ames Laboratory committee that advises the members...

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Civilian Radioactive Waste Management System Requirements Document...  

Office of Environmental Management (EM)

Civilian Radioactive Waste Management System Requirements Document Civilian Radioactive Waste Management System Requirements Document This document specifies the top-level...

122

Nuclear Materials Management & Safeguards System | National Nuclear...  

National Nuclear Security Administration (NNSA)

System Nuclear Materials Management & Safeguards System NMMSS U.S. Department of Energy U.S. Nuclear Regulatory Commission Nuclear Materials Management & Safeguards...

123

Energy Management System Implementation ? Do and Check  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

in management systems * DOE pilots in Northwest, Midwest, and California * Online web tools for energy management system implementation Who are we? Dorothy Fisher Atwood WC...

124

Joint Environmental Management System (EMS) Declaration of Conformance...  

Broader source: Energy.gov (indexed) [DOE]

Services Environmental Management System Joint Environmental Management System (EMS) Declaration of Conformance Joint Environmental Management System (EMS) Declaration of...

125

Project management improves well control events  

SciTech Connect (OSTI)

During a well control operation, the efficient use of personnel and equipment, through good project management techniques, contributes to increased safety and ensures a quality project. The key to a successful blowout control project is to use all resources in the most efficient manner. Excessive use of resources leads to unnecessary expenditures and delays in bringing the project under control. The Kuwait well control project, which involved more than 700 blowouts, was accomplished in a much shorter time (8 months) than first estimated (5 years). This improvement partly resulted from the application of sound project management techniques. These projects were prime examples of the need for a formal project management approach to handling wild well projects. There are many examples of projects that were successful in controlling wells but were economic disasters. Only through the effective application of project management can complex well control projects be completed in reasonable time frames at reasonable cost. The paper describes team management, project scope, organizational structures, scheduling, tracking models, critical path method, and decision trees.

Oberlender, G.D. [Oklahoma State Univ., Stillwater, OK (United States); Abel, L.W. [Wild Well Control Inc., Spring, TX (United States)

1995-07-10T23:59:59.000Z

126

System for Award Management (SAM):  

Broader source: Energy.gov (indexed) [DOE]

System for Award Management (SAM) System for Award Management (SAM) ChallengeHER Opportunities for Women in Federal Contracting May 23, 2013 Judith R. Zawatsky General Services Administration You are here today because you want to: a) Get a contract with the federal government b) Get a grant from the federal government c) Increase the work you are already doing with the federal government d) Learn new acronyms WHERE DO YOU START? www.sam.gov WHAT IS SAM? The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of * Central Contractor Registry (CCR) * Online Representations & Certifications Application (ORCA) * Excluded Parties List System (EPLS) WHAT DO I NEED TO DO? Create User Account Register or Update Entity Get contracts/grants

127

The configuration management program for the Emergency Management Support System  

SciTech Connect (OSTI)

Emergency response software is used increasingly by the US Department of Energy's (DOE's) Emergency Management Project (EMP) personnel at Hanford Site. This software must be reliable, of high quality, and capable of performing critical functions to support assessment of actual or potential consequences of any hazardous accidents onsite or events having potential offsite impacts. To better control the software and ensure its suitability for use as a tool to protect employees, the public, and environment, a method for specifying and certifying its capabilities and documenting its development and implementation was needed. A team of EMP staff, composed of personnel from Pacific Northwest Laboratory (PNL) and Boeing Computer Services- Richland (BCSR) under the direction of PNL EMP, responded to this need by developing a software configuration management program (CMP). This report documents the development of the CMP, including the strategies upon which the CMP is based, and describes the program as it has been implemented for EMS System software. The program relies on the integration of its three primary elements: the configuration management staff, tools, and process. Configuration management staff run the program, using specially designed configuration management forms to guide, document, and track the life cycle of the software. The configuration management process itself is reflected in the instructive forms and summarized in flowcharts representing each phase of the process -- from requirements specification through implementation and maintenance. 7 refs., 9 figs., 1 tab.

Probasco, K M [Pacific Northwest Lab., Richland, WA (United States); Stephan, E G [Boeing Computer Services Co., Richland, WA (United States)

1991-08-01T23:59:59.000Z

128

MIT System Design and Management Program  

E-Print Network [OSTI]

MIT System Design and Management Program MIT System Design and Management Program Leadership, innovation, systems thinking #12;MIT System Design and Management Program #12;about MIT The mission of MIT of leaders, MIT's System Design and Management Program (SDM) educates mid-career technical professionals

de Weck, Olivier L.

129

A 17025:2005A 17025:2005 Management SystemManagement System  

E-Print Network [OSTI]

A 17025:2005A 17025:2005 Management SystemManagement System Made SimpleMade Simple What to think about when reviewingWhat to think about when reviewing the Management Systemthe Management System #12 to have Technical expertise?expertise? #12;4 Management SystemManagement System OwnershipOwnership It

130

LED lamp power management system and method  

DOE Patents [OSTI]

An LED lamp power management system and method including an LED lamp having an LED controller 58; a plurality of LED channels 60 operably connected to the LED controller 58, each of the plurality of LED channels 60 having a channel switch 62 in series with at least one shunted LED circuit 83, the shunted LED circuit 83 having a shunt switch 68 in parallel with an LED source 80. The LED controller 58 reduces power loss in one of the channel switch 62 and the shunt switch 68 when LED lamp electronics power loss (P.sub.loss) exceeds an LED lamp electronics power loss limit (P.sub.lim); and each of the channel switches 62 receives a channel switch control signal 63 from the LED controller 58 and each of the shunt switches 68 receives a shunt switch control signal 69 from the LED controller 58.

Gaines, James; Clauberg, Bernd; Van Erp, Josephus A. M.

2013-03-19T23:59:59.000Z

131

Fuel control system  

SciTech Connect (OSTI)

A fuel control system is described comprising: a fuel rack movable in opposite fuel-increasing and fuel-decreasing directions; a rack control member movable in opposite fuel-increasing and fuel-decreasing directions; servo system means for moving the fuel rack in response to movement of the rack control member an electrically energizable member movable in opposite fuel-increasing and fuel-decreasing directions, the electrically energizable member being urged to move in its fuel-decreasing direction when energized; first coupling means for connecting the electrically energizable member to the rack control member to move the rack control member in its fuel-decreasing direction in response to movement of the electrically energizable member in its fuel-decreasing direction; a mechanical governor control having a member movable in opposite fuel-increasing and fuel-decreasing directions; second coupling means for connecting the mechanical governor to the rack control member to move the rack control member in its fuel-decreasing direction in response to movement of the mechanical governor member in its fuel-decreasing direction; bias means for biasing the rack control member to move in its fuel-increasing direction.

Staniak, W.A.; Samuelson, R.E.; Moncelle, M.E.

1986-10-14T23:59:59.000Z

132

DMSP-IEES: A Stochastic Programming Model Based on Dual-Interval and Multi-Stage Scenarios Modeling Approaches for Energy Systems Management and GHG Emissions Control  

Science Journals Connector (OSTI)

Energy-related activities contribute a major portion of anthropogenic greenhouse gas (GHG) emissions into the atmosphere. In this ... -environment systems management, in which issues of GHG-emission mitigation ca...

G. C. Li; G. H. Huang; Z. F. Liu

2014-10-01T23:59:59.000Z

133

Revised June 2014 Training Management System (TMS)  

E-Print Network [OSTI]

Revised June 2014 Training Management System (TMS) User Manual Contents Accessing the TMS.................................................................................................................15 #12;2 Accessing the TMS Before accessing the Training Management System you must know your Harvard...........................................................................................................................................2 Training Director, Training Manager, and Course Director Access

Heller, Eric

134

Burner control system  

SciTech Connect (OSTI)

A burner control apparatus for use with a furnace installation that has an operating control to produce a request for burner operation, a flame sensor to produce a signal when flame is present in the monitored combustion chamber, and one or more devices for control of ignition and/or fuel flow. The burner control apparatus comprises lockout apparatus for de-energizing the control apparatus, a control device for actuating the ignition and/or fuel control devices, and a timing circuit that provides four successive and partially overlapping timing intervals of precise relation, including a purge timing interval, a pilot ignition interval, and a main fuel ignition interval. The present invention further includes a burner control system which verifies the proper operation of certain sensors in a burner or furnace including particularly the air flow sensor. Additionally, the present system also prevents an attempt to ignite a burner if a condition is detected which indicates that the air flow sensor has been bypassed or wedged in the actuated position.

Cade, P.J.

1981-01-06T23:59:59.000Z

135

Management Controls for Small Ranches.  

E-Print Network [OSTI]

-retired farmer, a regularly employed individual who likes to live in the country, a person who wishes to pay for a small acreage of land as an investment or an individual who wants to live in the country after retirement. Most of these small ranchers wish...) the cows and bulls in the breeding herd and (3) the rancher controlling the land and cattle. The ranch, the breeding herd and the rancher are each truly unique. No other piece of real estate exists with exactly the same climatic conditions, soil type...

Maddox, L. A. Jr.

1974-01-01T23:59:59.000Z

136

Environmental Management System `We are implementing an  

E-Print Network [OSTI]

Environmental Management System `We are implementing an Environmental Management System to address an Environmental Management System (EMS) which addresses all of the aspects of our business which have an impact Environmental Management System in all parts of our business. · Monitor and reduce our consumption of energy

137

Battery Thermal Management System Design Modeling (Presentation)  

SciTech Connect (OSTI)

Presents the objectives and motivations for a battery thermal management vehicle system design study.

Kim, G-H.; Pesaran, A.

2006-10-01T23:59:59.000Z

138

WIMS - Waste Information Management System  

Office of Environmental Management (EM)

Welcome To WIMS Welcome To WIMS Waste Information Management System WIMS new web address: http://www.emwims.org WIMS is developed to provide DOE Headquarters and site waste managers with the tools necessary to easily visualize, understand, and manage the vast volumes, categories, and problems of forecasted waste streams. WIMS meets this need by providing a user-friendly online system to gather, organize, and present waste forecast data from DOE sites. This system provides a method for identification of waste forecast volumes, material classes, disposition pathways, and potential choke points and barriers to final disposition. Disclaimer: Disposition facility information presented is for planning purposes only and does not represent DOE's decisions or commitments. Any selection of disposition facility will be made after technical, economic, and policy considerations.

139

Building Technologies Office: Integrated Building Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Integrated Building Integrated Building Management System Research Project to someone by E-mail Share Building Technologies Office: Integrated Building Management System Research Project on Facebook Tweet about Building Technologies Office: Integrated Building Management System Research Project on Twitter Bookmark Building Technologies Office: Integrated Building Management System Research Project on Google Bookmark Building Technologies Office: Integrated Building Management System Research Project on Delicious Rank Building Technologies Office: Integrated Building Management System Research Project on Digg Find More places to share Building Technologies Office: Integrated Building Management System Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE

140

RPP Computer Automated Surveillance System (CASS) to Tank Monitor and Control System (TMACS) transfer project plan  

SciTech Connect (OSTI)

Management plan to ensure the orderly, systematic transfer of alarms from the retired Computer Automated Surveillance System (CASS) to the Tank Monitor and Control System (TMACS).

SHIPLER, C.E.

1999-07-13T23:59:59.000Z

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Safety Management System Policy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Program Management » Safety » Safety Management Services » Program Management » Safety » Safety Management System Policy Safety Management System Policy Safety Management Systems provide a formal, organized process whereby people plan, perform, assess, and improve the safe conduct of work. The Safety Management System is institutionalized through Department of Energy (DOE) directives and contracts to establish the Department-wide safety management objective, guiding principles, and functions. The DOE safety management system consists of six components: Objective Guiding principles Core functions Mechanisms Responsibilities Implementation Safety Management System Policy More Documents & Publications "DOE O 450.2 INTEGRATED SAFETY MANAGEMENT AND DOE P 450.4A INTEGRATED SAFETY MANAGEMENT POLICY FAMILIAR LEVEL

142

Securing Control Systems Modems  

Broader source: Energy.gov (indexed) [DOE]

Recommended Practice for Securing Recommended Practice for Securing Control System Modems January 2008 iii ABSTRACT This paper addresses an often overlooked "backdoor" into critical infrastructure control systems created by modem connections. A modem's connection to the public telephone system is similar to a corporate network connection to the Internet. By tracing typical attack paths into the system, this paper provides the reader with an analysis of the problem and then guides the reader through methods to evaluate existing modem security. Following the analysis, a series of methods for securing modems is provided. These methods are correlated to well-known networking security methods. iv ACKNOWLEDGEMENT This document was developed for the U.S. Department of Homeland

143

Nuclear Materials Management and Safeguards System (NMMSS)  

SciTech Connect (OSTI)

This paper describes the Nuclear Materials Management and Safeguards System (NMMSS) which is sponsored by the Department of Energy and the Nuclear Regulatory Commission. The system serves national security and program management interests, and international interests in the programs for the peaceful application of nuclear energy and non-proliferation of nuclear weapons. Within the scope of the NMMSS are found all nuclear materials applied and controlled under United States law and related international agreements, including U.S. nuclear materials production programs and US private nuclear industrial activities. In addition, its national and international scope enables it to provide services to other organizations such as the Arms Control and Disarmament Agency, the Department of State, and the US Congress.

Jacobsen, S.E.; Matthews, W.B. III; McKamy, E.D.; Pedigo, R.B.

1991-01-01T23:59:59.000Z

144

A New Digital Lighting Control System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

A New Digital Lighting Control System A New Digital Lighting Control System Speaker(s): Charles Knuffke Date: June 29, 2010 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Francis Rubinstein When various Lighting Controls components are discussed, they're usually slotted into separate "silos" - Occupancy Sensors, Relay Panels, Dimming Controls, and Daylighting Controls. Trying to combine two or more of these into a single system usually requires a fair amount of technical expertise and often help from different manufacturers. Combine that with the need under LEED to get these systems commissioned, often without detailed sequence of operation information, and that helps to explains why many view Lighting Controls as overly complex. And try to integrate the Lighting Controls into a larger overall building management system so their

145

Hierarchical Control and Management of Virtual Microgrids for Vehicle Electrification  

E-Print Network [OSTI]

of electrical power generation and delivery. A Smart Grid is an intelligent and automated energy grid and new types of loads such as plug-in (hybrid) electric vehicles (PEVs); (2) optimizing systemHierarchical Control and Management of Virtual Microgrids for Vehicle Electrification Feng Lina

Zhang, Hongwei

146

Model-based integrated management: applying autonomic systems engineering to network and systems management  

Science Journals Connector (OSTI)

We present a novel approach for integrated management of networks and information systems, based on the specification of executable behaviour models. A model processing plane is introduced, consisting of a number of processing units that together form ... Keywords: ASE, autonomic systems, autonomic systems engineering, behaviour modelling, information systems, management integration, model transformation, model-based integrated management, network management, systems management

Edzard Hofig; Peter H. Deussen

2011-12-01T23:59:59.000Z

147

Compressed Air System Control Strategies  

Broader source: Energy.gov [DOE]

This tip sheet briefly discusses compressed air system control strategies as a means to improving and maintaining system performance.

148

Configuration management program plan for Hanford site systems engineering  

SciTech Connect (OSTI)

This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

Kellie, C.L.

1996-03-28T23:59:59.000Z

149

Pollution Control: Storm Water Management (Maine) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Pollution Control: Storm Water Management (Maine) Pollution Control: Storm Water Management (Maine) Pollution Control: Storm Water Management (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maine Program Type Siting and Permitting Provider Department of Environmental Protection A person may not construct, or cause to be constructed, a project that

150

Security Controls for Unclassified Information Systems Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Manual establishes minimum implementation standards for cyber security technical, management, and operational controls that will be followed in all information systems operated by DOE and the information systems. Does not cancel other directives. Canceled by DOE O 205.1B

2009-01-05T23:59:59.000Z

151

Security Controls for Unclassified Information Systems Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Manual establishes minimum implementation standards for cyber security technical, management, and operational controls that will be followed in all information systems operated by DOE and the information systems. Admin Chg 1 dated 9-1-09; Admin Chg 2 dated 12-22-09. Canceled by DOE O 205.1B.

2009-01-05T23:59:59.000Z

152

Security Controls for Unclassified Information Systems Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Manual establishes minimum implementation standards for cyber security technical, management, and operational controls that will be followed in all information systems operated by DOE and the information systems. Admin Chg 1 dated 9-1-09. Canceled by DOE O 205.1B.

2009-01-05T23:59:59.000Z

153

PHEV Engine Control and Energy Management Strategy | Department...  

Energy Savers [EERE]

Management Strategy PHEV Engine Control and Energy Management Strategy 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer...

154

Using the CIM Conceptualization in Autonomic System Management: the System Management Ontology Project  

E-Print Network [OSTI]

Using the CIM Conceptualization in Autonomic System Management: the System Management Ontology management domain. This conceptualization layer, or ontology, would provide the appropriate vocabulary across multiple organizations. The CIM standard #12;schemas, on which system databases on CIM

Calvanese, Diego

155

The structure of energy management systems  

SciTech Connect (OSTI)

Energy management systems (EMS) which serve a variety of building functions are a complex combination of hardware and software. The design of the system is a trade-off between different characteristics including functions performed, number of connected points, cost, compatibility with other systems, reliability and flexibility. The functions performed by the EMS vary significantly with respect to complexity, interaction and rate of response required. The majority of functions interact either directly or indirectly with each other. The data required to support EMS functions can be classed as status, control, qualifying and informational. The amount of data required is extensive and must be brought together in many combinations to achieve the desired performance. The transfer of data is carried out by a communication system which connects the components of the EMS. The communication requirements, in addition to functional performance, are influenced by the application flexibility desired and the level of distribution of the system. Three general distribution levels are centralized, status and control decentralized, and functionally decentralized. The ability of the EMS of one manufacturer to interact effectively with EMS components or complete systems of other manufacturers is limited by the respective selections for data structures, communication methods and level of distribution. In general, the unique selection of characteristics chosen by each manufacturer precludes the integration of energy management system components of different manufacturers unless details of implementation are known.

Miller, D.E.

1983-06-01T23:59:59.000Z

156

Heliostat control system strategies  

SciTech Connect (OSTI)

The purpose of this study is to identify, evaluate, and recommend potential alternatives to methods currently employed in the control of and communication with a heliostat array in a solar thermal power plant. The principle goal of this study is to demonstrate the feasibility of reducing significantly the current projected costs for heliostat array communication, control and actuator subsystems. A number of alternatives to the present technique of using dedicated data transmission cables for communication between a central computer and heliostat computer are described in the paper. It appears that by converting to a radio frequency communication system or a carrier-current system that a number of problems (including cost) associated with dedicated data transmission cable can be avoided. To relieve the computing load of the central computer it is suggested that the heliostat microcomputer be given more direct responsibility for sun vector calculations and error compensation routines for each individual heliostat. By using the radio frequency or carriercurrent communication scheme, and increasing each heliostat computer's computing load, there will be a significant reduction of cost for control of the heliostat field for third generation solar thermal power plants. The results of this study indicate that the combined communication, control, and actuator subsystem costs can potentially be reduced to less than $500/heliostat (approximately $9/m/sup 2/); this is a significant reduction compared with the current projected corresponding composite costs of $1343/heliostat (approximately $25/m/sup 2/) for the second generation concept.

Pearson, J.; Chen, B.

1983-11-01T23:59:59.000Z

157

Managing Threats to Web Databases and Cyber Systems  

Science Journals Connector (OSTI)

This chapter provides an overview of some of the cyber threats information systems as well as data management ... then discusses potential solutions and challenges. The threats include access control violations, ...

Bhavani Thuraisingham

2005-01-01T23:59:59.000Z

158

DOCS System Configuration Management Plan | Department of Energy  

Energy Savers [EERE]

DOCS System Configuration Management Plan DOCS System Configuration Management Plan The DOCS Systems Configuration Management Plan (SCMP), from an actual DOE systems engineering...

159

V-120: EMC Smarts Network Configuration Manager Java RMI Access Control  

Broader source: Energy.gov (indexed) [DOE]

0: EMC Smarts Network Configuration Manager Java RMI Access 0: EMC Smarts Network Configuration Manager Java RMI Access Control Flaw Lets Remote Users Gain Full Control V-120: EMC Smarts Network Configuration Manager Java RMI Access Control Flaw Lets Remote Users Gain Full Control March 27, 2013 - 12:51am Addthis PROBLEM: EMC Smarts Network Configuration Manager Java RMI Access Control Flaw Lets Remote Users Gain Full Control PLATFORM: Version(s): prior to 9.2 ABSTRACT: Two vulnerabilities were reported in EMC Smarts Network Configuration Manager. REFERENCE LINKS: SecurityTracker Alert ID: 1028342 www.emc.com CVE-2013-0935 IMPACT ASSESSMENT: Medium DISCUSSION: A remote user can access some Java Remote Method Invocation methods without authenticating to gain control of the target system. A user can exploit unspecified flaws in the NCM System Management

160

V-120: EMC Smarts Network Configuration Manager Java RMI Access Control  

Broader source: Energy.gov (indexed) [DOE]

0: EMC Smarts Network Configuration Manager Java RMI Access 0: EMC Smarts Network Configuration Manager Java RMI Access Control Flaw Lets Remote Users Gain Full Control V-120: EMC Smarts Network Configuration Manager Java RMI Access Control Flaw Lets Remote Users Gain Full Control March 27, 2013 - 12:51am Addthis PROBLEM: EMC Smarts Network Configuration Manager Java RMI Access Control Flaw Lets Remote Users Gain Full Control PLATFORM: Version(s): prior to 9.2 ABSTRACT: Two vulnerabilities were reported in EMC Smarts Network Configuration Manager. REFERENCE LINKS: SecurityTracker Alert ID: 1028342 www.emc.com CVE-2013-0935 IMPACT ASSESSMENT: Medium DISCUSSION: A remote user can access some Java Remote Method Invocation methods without authenticating to gain control of the target system. A user can exploit unspecified flaws in the NCM System Management

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Microsoft Word - Management Control Cover .doc  

Broader source: Energy.gov (indexed) [DOE]

Management Controls over the National Nuclear Security Administration's Ability to Maintain Capability of the TA-18 Mission OAS-M-07-02 February 2007 Department of Energy Vdashingtori, GC 2 0 5 8 5 February 20, 2007 MEMORANDUM FOR FOR DEFENSE PROGFKMS FROM: 1 Assistant hspector General for Performance Audits Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Management Controls over the National Nuclear Security Administration's Ability to Maintain Capability of the TA- 18 Mission" BACKGROUND The mission of Technical Area 18 (TA-I 8) at the National Nuclear Security Administration's (NNSA) Los Alamos National Laboratory (Los Alamos) was to conduct nuclear criticality experiments and hands-on training in nuclear safeguards, criticality

162

Turbocharger control system  

SciTech Connect (OSTI)

A turbocharger control system is described for an engine having a turbocharger with a variable output compressor driven by a variable input turbine, the compressor boosting the pressure of an input manifold of the engine and the turbine being run from the exhaust gases of the engine. The control system consists of: a computing circuit including input circuit means for receiving input signals representative of operational parameters of the engine, programmable memory means for storing predetermined tabular data and sequential and computational instructions, processor means responsive to the memory means for receiving the input signals and generating output signals as a function of the input signals, tabular data, and instructions, and output circuit means for outputing the plurality of output signals, sensor means connected to the engine and the computing circuit for sensing the pressure in the manifold, the temperature of the exhaust gases, the speed of the engine, and position of the throttle, compressor and turbine actuators of the engine and generating signals representative thereof; and actuator means connected to the output circuit means for controlling the position of the actuators in response to predetermined ones of the output signals, respectively; the computing circuit, sensor means, and actuator means defining a turbine control loop for regulating the input of the exhaust gasses to the turbine as a function of the error difference between an optimum manifold pressure of the engine and the actual manifold pressure of the engine; and a compressor control loop for regulating the output of air flow from the compressor as a function of the speed and acceleration of the engine.

Fujawa, C.S.; Masteller, S.B.

1986-06-10T23:59:59.000Z

163

The potential role of wildlife in the spread and control of foot and mouth disease in an extensive livestock management system  

E-Print Network [OSTI]

. This research project is designed to investigate the potential role of wildlife (deer) in the transmission and spread of FMD in an extensive livestock management system in southern Texas. The spread of FMD was simulated in white tailed deer populations using a...

Highfield, Linda

2009-05-15T23:59:59.000Z

164

Management summary report. Auditing and financial system  

SciTech Connect (OSTI)

Increased leasing of Federal lands for energy exploration will add to the regulatory and administrative responsibilities of the USGS's Conservation Division. Similar responsibilities for Indian lands will arise. The objectives of the Conservation Division is to reduce the regulatory burden on industry while effectively and efficiently discharging its responsibility. This Management Summary Report represents the completion of the Preliminary Systems Design of the Auditing and Financial System, and is the first phase of the Improved Royalty Management Program (IRMP). Work reported includes: a Functional Specifications Report; Technical Specifications Report; Installation Plan; and a cost/benefit analysis. The potential benefits to be realized from the IRMP are significant and include: increased royalty receipts; more timely availability of funds; increased productivity of personnel; reduced regulatory burden on private industry; tighter security over information collected; reduced exposure to fraud and abuse; and better control over activities and funds.

Feldmiller, W.H.

1980-01-01T23:59:59.000Z

165

Integrated Vehicle Thermal Management Systems (VTMS) Analysis...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Integrated Vehicle Thermal Management Power Electronic Thermal System Performance and Integration Characterization and Development of Advanced Heat Transfer Technologies...

166

Automated Transportation Management System (ATMS)  

Broader source: Energy.gov (indexed) [DOE]

Re evised June 2010 Re evised June 2010 Autom The Depa Transport an integra system al outbound air. Its ea 1989 DOE significant operationa commerce electronic rates, pre transporta users eva shipments opportunit logistics im ATMS is i radioactiv shipments System ATMS is a activities p packaging including materials. common s lading, fre * W * C S * A * H * E * * O 0 mated T artment of Ene tation Manage ated web-base lowing users freight shipm arly developm E Inspector G t opportunitie al efficiency t e. Today's sy cally prepare s pare shipping ation bills befo aluate carrier s, and use co ties for system mprovements ts capability t ve and other h s in a comple Modules a modular sys performed by g and transpo radioactive a . Its modules shipment info eight bills, rate System Web Applic Carrier Eval Selection Automated

167

Cyber Incidents Involving Control Systems  

SciTech Connect (OSTI)

The Analysis Function of the US-CERT Control Systems Security Center (CSSC) at the Idaho National Laboratory (INL) has prepared this report to document cyber security incidents for use by the CSSC. The description and analysis of incidents reported herein support three CSSC tasks: establishing a business case; increasing security awareness and private and corporate participation related to enhanced cyber security of control systems; and providing informational material to support model development and prioritize activities for CSSC. The stated mission of CSSC is to reduce vulnerability of critical infrastructure to cyber attack on control systems. As stated in the Incident Management Tool Requirements (August 2005) ''Vulnerability reduction is promoted by risk analysis that tracks actual risk, emphasizes high risk, determines risk reduction as a function of countermeasures, tracks increase of risk due to external influence, and measures success of the vulnerability reduction program''. Process control and Supervisory Control and Data Acquisition (SCADA) systems, with their reliance on proprietary networks and hardware, have long been considered immune to the network attacks that have wreaked so much havoc on corporate information systems. New research indicates this confidence is misplaced--the move to open standards such as Ethernet, Transmission Control Protocol/Internet Protocol, and Web technologies is allowing hackers to take advantage of the control industry's unawareness. Much of the available information about cyber incidents represents a characterization as opposed to an analysis of events. The lack of good analyses reflects an overall weakness in reporting requirements as well as the fact that to date there have been very few serious cyber attacks on control systems. Most companies prefer not to share cyber attack incident data because of potential financial repercussions. Uniform reporting requirements will do much to make this information available to Department of Homeland Security (DHS) and others who require it. This report summarizes the rise in frequency of cyber attacks, describes the perpetrators, and identifies the means of attack. This type of analysis, when used in conjunction with vulnerability analyses, can be used to support a proactive approach to prevent cyber attacks. CSSC will use this document to evolve a standardized approach to incident reporting and analysis. This document will be updated as needed to record additional event analyses and insights regarding incident reporting. This report represents 120 cyber security incidents documented in a number of sources, including: the British Columbia Institute of Technology (BCIT) Industrial Security Incident Database, the 2003 CSI/FBI Computer Crime and Security Survey, the KEMA, Inc., Database, Lawrence Livermore National Laboratory, the Energy Incident Database, the INL Cyber Incident Database, and other open-source data. The National Memorial Institute for the Prevention of Terrorism (MIPT) database was also interrogated but, interestingly, failed to yield any cyber attack incidents. The results of this evaluation indicate that historical evidence provides insight into control system related incidents or failures; however, that the limited available information provides little support to future risk estimates. The documented case history shows that activity has increased significantly since 1988. The majority of incidents come from the Internet by way of opportunistic viruses, Trojans, and worms, but a surprisingly large number are directed acts of sabotage. A substantial number of confirmed, unconfirmed, and potential events that directly or potentially impact control systems worldwide are also identified. Twelve selected cyber incidents are presented at the end of this report as examples of the documented case studies (see Appendix B).

Robert J. Turk

2005-10-01T23:59:59.000Z

168

COURSE PROGRAM MANAGEMENT OF EDUCATIONAL SYSTEMS  

E-Print Network [OSTI]

1 « » COURSE PROGRAM MANAGEMENT OF EDUCATIONAL SYSTEMS Author : O. Mashkina, Ph.D. 1 and processes in education management. In current circumstances, a priority of the national educational system features of the education system management in the modern environment; - lay the theoretic

Kaplan, Alexander

169

Traffic Management System Performance November 11, 2002  

E-Print Network [OSTI]

Traffic Management System Performance November 11, 2002 David Levinson1 Wei Chen2 Department uses regression analysis to evaluate long-run traffic management system performance. Three important traffic management systems in the Twin Cities metro area - Ramp Metering, Variable Message Signs (VMS

Levinson, David M.

170

SP 800-128. Guide for Security-Focused Configuration Management of Information Systems  

Science Journals Connector (OSTI)

The purpose of Special Publication 800-128, Guide for Security-Focused Configuration Management of Information Systems, is to provide guidelines for organizations responsible for managing and administering the security of federal information systems ... Keywords: Configuration management, SecCM, control, information systems, monitoring, risk management framework, security content automation protocol (SCAP), security program, security-focused continuous monitoring

L. Arnold Johnson; Kelley L. Dempsey; Ronald S. Ross; Sarbari Gupta; Dennis Bailey

2011-08-01T23:59:59.000Z

171

Sandia National Laboratories: Carbon Management Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management Systems Models Publications Questions WECSsim Model The Water, Energy and Carbon Sequestration Model (WECSsim): A Collaborative Systems Model The Water, Energy and...

172

Computerized Control of Environmental Systems  

E-Print Network [OSTI]

This paper examines the actual implementation of two computerized environmental system maintenance control centers. Project "A" is a candy manufacturing plant where controlled systems included subfreezing storage, HVAC, and cold storage (40F to 55F...

Gatti, F. L.

1980-01-01T23:59:59.000Z

173

PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE...  

Energy Savers [EERE]

SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS...

174

Ambient Control Systems | Open Energy Information  

Open Energy Info (EERE)

Control Systems Control Systems Jump to: navigation, search Logo: Ambient Control Systems Name Ambient Control Systems Address 1810 Gillespie Way Place El Cajon, California Zip 92020 Sector Solar Product Solar energy device with a computerized energy management Website http://www.ambientalert.com/ma Coordinates 32.8193566°, -116.981232° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.8193566,"lon":-116.981232,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

175

Energy Management and Control Systems and their Use for Performance Monitoring in the LoanSTAR Program, Technical Report prepared for the Lawrence Berkeley Laboratory, University of California, Energy and Environment Division  

E-Print Network [OSTI]

Detection: Any data transmission errors should be automatically detected and corrected. Errors can occur, not only due to faulty or inaccurate sensors, but also when transmitting data from the site. Since data are traveling over commercial telephone lines... Management and Control Systems to per- form this same data collection task. One emphasis of this stage of the work was on formalizing the evaluation process, by developing guide- lines to assess the usefulness of an EMCS for monitoring. These guidelines...

Heinemeier, K. E.; Akbari, H.

1993-01-01T23:59:59.000Z

176

Definition: Distribution Management System | Open Energy Information  

Open Energy Info (EERE)

Management System Management System Jump to: navigation, search Dictionary.png Distribution Management System A Distribution Management System (DMS) is a utility IT system capable of collecting, organizing, displaying and analyzing real-time or near real-time electric distribution system information. A DMS can also allow operators to plan and execute complex distribution system operations in order to increase system efficiency, optimize power flows, and prevent overloads. A DMS can interface with other operations applications such as geographic information systems (GIS), outage management systems (OMS), and customer information systems (CIS) to create an integrated view of distribution operations.[1] View on Wikipedia Wikipedia Definition In the recent years, utilization of electrical energy increased

177

Earned Value Management System (EVMS) - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0A, Earned Value Management System (EVMS) by Rick Blaisdell Functional areas: Capital Assets, Contract Management, Program Management, Project Management This Guide provides...

178

PPPL Project Management System Page 1 of 111 PPPL Project Management System Description Rev-01  

E-Print Network [OSTI]

). Incorporated PMSD supporting procedures as sub- procedures in a new Appendix E. #12;PPPL Project ManagementPPPL Project Management System Page 1 of 111 PPPL Project Management System Description Rev-01 Project Management System Description (PMSD) Revision 1 June 2011 Prepared by

Princeton Plasma Physics Laboratory

179

System Demand-Side Management: Regional results  

SciTech Connect (OSTI)

To improve the Bonneville Power Administration's (Bonneville's) ability to analyze the value and impacts of demand-side programs, Pacific Northwest Laboratory (PNL) developed and implemented the System Demand-Side Management (SDSM) model, a microcomputer-based model of the Pacific Northwest Public Power system. This document outlines the development and application of the SDSM model, which is an hourly model. Hourly analysis makes it possible to examine the change in marginal revenues and marginal costs that accrue from the movement of energy consumption from daytime to nighttime. It also allows a more insightful analysis of programs such as water heater control in the context of hydroelectric-based generation system. 7 refs., 10 figs., 10 tabs.

Englin, J.E.; Sands, R.D.; De Steese, J.G.; Marsh, S.J.

1990-05-01T23:59:59.000Z

180

Appendix 1 -Additional iManage Systems  

Broader source: Energy.gov (indexed) [DOE]

- Additional iManage/Corporate Information Systems - Additional iManage/Corporate Information Systems In addition to STARS, STRIPES, IDW/iPortal, these are corporate systems maintained by the Office of Corporate Information Systems. These systems are currently not included as part of the requirements. Application/Project Automated Time and Attendance (ATAAPS) Budget and Reporting Code System (BARC) Budget Table System (BTS) Consent Order Tracking System (COTS) Consolidated Accounting and Investment System (CAIS) Departmental Audit Report Tracking System (DARTS) - Enhancements Departmental Audit Report Tracking System (DARTS) - Existing Departmental Inventory Management System (DIMS) DOEInfo eMailList ePerformance eRooms (Pensions) External CFO Website Folio (Portfolio Management) Funds Distribution System (FDS)

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Tank waste remediation system privatization infrastructure program, configuration management implementation plan  

SciTech Connect (OSTI)

This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

Schaus, P.S.

1998-08-18T23:59:59.000Z

182

Thermodynamics of feedback controlled systems  

Science Journals Connector (OSTI)

We compute the entropy reduction in feedback controlled systems due to the repeated operation of the controller. This was the lacking ingredient to establish the thermodynamics of these systems, and in particular of Maxwell’s demons. We illustrate some of the consequences of our general results by deriving the maximum work that can be extracted from isothermal feedback controlled systems. As a case example, we finally study a simple system that performs an isothermal information-fueled particle pumping.

F. J. Cao and M. Feito

2009-04-10T23:59:59.000Z

183

Environmental control system  

SciTech Connect (OSTI)

An environmental control system for controlling the environmental conditions in a swimming pool hall 1 comprises a heat pump having a multi-section evaporator 8, compressors 23a and 23b and a multi-section condensor 18. In the day-time, the dry bulb temperature in the pool hall is maintained by circulating space air through a duct 3 to the evaporator 8 where the latent heat is recovered from the moisture laden air. This heat is rejected via the condensor 18 either to the now drier recirculated air or fresh air from an inlet 13 or a mixture of air from the two sources. In a night mode of operation, circulation of space air through the duct 3 is prevented and instead it is recirculated via a direct recirculation duct 53 and is heated by the condensor 18, the heat used to do this being recovered from outside air inducted into the evaporator 8 via an inlet 50. In order to prevent frosting of the evaporator when the outside air temperature is too low, a damper 52 may be opened to allow some space air to pass through the evaporator 8 and raise its temperature. In order to increase the heat recovery capability of the compressor, storage tank 56 is used to collect waste water from showers etc. and also from backwash through the pool water filter and when this tank is full, its water is chilled by means of a water chiller 15 in parallel with the evaporator and the heat so recovered is rejected to the re-circulating space air by means of the condensor 18.

Foley, P. N.; Turbard, A. M.

1985-05-21T23:59:59.000Z

184

2013 IREP Symposium-Bulk Power System Dynamics and Control -IX (IREP), August 25-30, 2013, Rethymnon, Greece Active network management: planning under  

E-Print Network [OSTI]

]. Such incentives have resulted in the on-going installation of wind and solar power generation resources2013 IREP Symposium-Bulk Power System Dynamics and Control -IX (IREP), August 25-30, 2013 In Europe, concern about the environmental impact of the electricity industry is currently driving

Ernst, Damien

185

Information Systems Management (ISM) 2011 Department of Supply Chain & Information Systems  

E-Print Network [OSTI]

Information Systems Management (ISM) 2011 Department of Supply Chain & Information Systems Information Systems Management Minor Application Overview The Information Systems Management focuses Systems Management and Applications c. MIS 431 (3) Business Data Management d. MIS 446 (3) Information

Yener, Aylin

186

Architecting dependable systems with proactive fault management  

Science Journals Connector (OSTI)

Management of an ever-growing complexity of computing systems is an everlasting challenge for computer system engineers. We argue that we need to resort to predictive technologies in order to harness the system's complexity and transform a vision of ...

Felix Salfner; Miroslaw Malek

2010-01-01T23:59:59.000Z

187

Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan  

SciTech Connect (OSTI)

This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.

Burgard, K.G.

1998-09-24T23:59:59.000Z

188

Configuration management program plan for Hanford site systems engineering  

SciTech Connect (OSTI)

This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

Hoffman, A.G.

1994-11-14T23:59:59.000Z

189

Waste receiving and processing plant control system; system design description  

SciTech Connect (OSTI)

The Plant Control System (PCS) is a heterogeneous computer system composed of numerous sub-systems. The PCS represents every major computer system that is used to support operation of the Waste Receiving and Processing (WRAP) facility. This document, the System Design Description (PCS SDD), includes several chapters and appendices. Each chapter is devoted to a separate PCS sub-system. Typically, each chapter includes an overview description of the system, a list of associated documents related to operation of that system, and a detailed description of relevant system features. Each appendice provides configuration information for selected PCS sub-systems. The appendices are designed as separate sections to assist in maintaining this document due to frequent changes in system configurations. This document is intended to serve as the primary reference for configuration of PCS computer systems. The use of this document is further described in the WRAP System Configuration Management Plan, WMH-350, Section 4.1.

LANE, M.P.

1999-02-24T23:59:59.000Z

190

Definition: Customer Energy Management Device and System | Open Energy  

Open Energy Info (EERE)

Device and System Device and System Jump to: navigation, search Dictionary.png Customer Energy Management Device and System A device that can control other energy devices such as thermostats, lighting, direct load control devices, or distributed energy resource within the customer premise. These devices may also receive information or control signals from utillities or third party energy service providers. These devices can help customers manage electricity usage automatically by utilizing information from service providers, or preferences set by the customer.[1] Related Terms energy, electricity generation, distributed energy resource References ↑ https://www.smartgrid.gov/category/technology/customer_energy_management_device_and_system [[Cat LikeLike UnlikeLike You like this.Sign Up to see what your friends like.

191

Environmental Management Systems (Iowa) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Management Systems (Iowa) Environmental Management Systems (Iowa) Environmental Management Systems (Iowa) < Back Eligibility Local Government Municipal/Public Utility Tribal Government Program Info State Iowa Program Type Environmental Regulations Fees Training/Technical Assistance Siting and Permitting Provider Iowa Department of Natural Resources A solid waste planning area (e.g., the land encompassed by a municipality with a comprehensive solid waste management policy) may qualify to be an Environmental Management System if it provides multiple environmental services in addition to solid waste disposal and plans for the continuous improvement of solid waste management by appropriately and aggressively mitigating the environmental impacts of solid waste disposal, including greenhouse gas emissions reduction measures. Environmental Management

192

MANAGEMENT INFORMATION SYSTEMS (MIS) CONCENTRATION FOR UNDERGRADUATES  

E-Print Network [OSTI]

MANAGEMENT INFORMATION SYSTEMS (MIS) CONCENTRATION FOR UNDERGRADUATES The management information systems concentration, like a major, focuses on the use of information technology for value creation creation. Link to Rensselaer 2012-2013 Catalog Required Courses MGMT 4240 Systems Analysis & Design MGMT

Salama, Khaled

193

Civilian Radioactive Waste Management System Requirements Document  

SciTech Connect (OSTI)

The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible for design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.

C.A. Kouts

2006-05-10T23:59:59.000Z

194

Computer aided home energy management system.  

E-Print Network [OSTI]

??As the electricity demand approaches generation capacity, the operating reserve capacity of the power system shrinks, causing an increased risk of outages. Demand Side Management… (more)

Moholkar, Asawari A.

2005-01-01T23:59:59.000Z

195

UNCLASSIFIED Nuclear Materials Management & Safeguards System  

National Nuclear Security Administration (NNSA)

Nuclear Materials Management & Safeguards System CHANGE OF PROJECT NUMBER UPDATE PROJECT Project Number: Title: Date Valid: Date Deactivated: Classification Codes: Project Number:...

196

ORISE: Asset Readiness Management System (ARMS)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Asset Readiness Management System (ARMS) Database tracks emergency response exercises and equipment to help DOE asses emergency preparedness Developed by the Oak Ridge Institute...

197

EMS - Environmental Management System | Princeton Plasma Physics...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the rigorous requirements the globally recognized International Organization for Standardization (ISO) 14001:2004 Environmental Management System Standard. In 2011, an EMS...

198

Energy Management System Implementation ? First Webinar- Overview  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

W1-1 | Advanced Manufacturing Office eere.energy.gov ADVANCED MANUFACTURING OFFICE Energy Management System Implementation - First Webinar- Overview Deann Desai and Ed Hardison 4...

199

Environmental Management Systems | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Systems The U.S. Department of Energy (DOE) is committed to implement sustainability into all aspects of operations. Executive Order (EO) 13423, Strengthening Federal...

200

Environmental Management Systems | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Systems The Department of Energy (DOE) is committed to implement sustainability into all aspects of operations. Executive Order (EO) 13423, Strengthening Federal...

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Security Metricsfor Process Control Systems  

Broader source: Energy.gov [DOE]

This document describes the foundations of metrics, discusses application of these metrics to control system environments, introduces a metrics taxonomy, and suggests usage of metrics to achieve...

202

Solar Energy Control System Design.  

E-Print Network [OSTI]

?? This thesis covers design, simulation and implementation of a solar energy control system for an on grid energy storage device. The design covers several… (more)

Yang, Sun

2013-01-01T23:59:59.000Z

203

Waste Management Information System (WMIS) User Guide  

SciTech Connect (OSTI)

This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data throuh the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal.

R. E. Broz

2008-12-22T23:59:59.000Z

204

Spent Nuclear Fuel Project document control and Records Management Program Description  

SciTech Connect (OSTI)

The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document.

MARTIN, B.M.

2000-05-18T23:59:59.000Z

205

Implementation Guide for Integrating Environmental Management Systems into Integrated Safety Management Systems  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides guidance to assist DOE sites in identifying those missing environmental management systems elements and integrating them into the site's integrated safety management system. Canceled by DOE N 251.96.

2004-08-20T23:59:59.000Z

206

Privacy Impact Assessment OFEO Facilities Management System Facilities Center  

E-Print Network [OSTI]

Privacy Impact Assessment OFEO Facilities Management System ­ Facilities Center I. System Identification 1. IT System Name: Facilities Management System - FacilityCenter 2. IT System Sponsor: Office. IT System Manager: Michelle T. Gooch, Facilities Management Systems Manager 5. PIA Author: Michelle T. Gooch

Mathis, Wayne N.

207

Optimal Control of Distillation Systems  

E-Print Network [OSTI]

The optimum performance of a distillation system can be evaluated by examining the product purities, the product recoveries, and the system's capability to respond to small or large, expected or unexpected, plant disturbances. An optimal control...

Chatterjee, N.; Suchdeo, S. R.

1984-01-01T23:59:59.000Z

208

Control Center and Data Management Improvements Modernize Bulk...  

Broader source: Energy.gov (indexed) [DOE]

Operations Corporation's (GSOC) Smart Grid Investment Grant (SGIG) project modernized bulk power management and control center operations for 38 electric membership...

209

Weighted control systems  

E-Print Network [OSTI]

in regard to harmonic functions determination. The feasibility of some of these approaches were examined. ACKNOWLEDGMENTS I would like to express my appreciation to Dr. A. W. Wortham, Professor of Industrial Engineering at Texas aaM University..., to Dr. R. J. Vernon, Professor of Industrial Engineering, and Dr. A. W. Smith, Assistant Professor of Management, College of Business Administration. I wish to acknowledge the Ministry of Higher Education and Scientific Research, Iraq, for its full...

Al-Radhi, Adhi Omar

1974-01-01T23:59:59.000Z

210

Control Account Manager (CAM) Responsibilities Control Account Manager (CAM) responsibilities are listed in the PPPL Project  

E-Print Network [OSTI]

Procedures. Below is a brief summary of those responsibilities: Prior to project start: · Develop Work are listed in the PPPL Project Management System Description (PMSD) and PMSD Appendix E Supporting Breakdown Structure (WBS) with project team and stakeholders · Plan the work and identify tasks

Princeton Plasma Physics Laboratory

211

The use of expert systems in well control  

E-Print Network [OSTI]

of this research was to combine well control simulators and expert systems, into an effective well control training tool. Also of great importance was that the system should be based around a small computer system like the Macintosh II. A Driller's Panel... Hierarchy Program Manager Data Entry Driller's Panel Simulator ? Pre-Kick Environment. Pre-Kick Expert System Predictive Model Driller's Panel Simulator - Circulation Environment Circulation Expert System VERIFICATION OF THE SYSTEM Data Used...

Stoll, Paul Eugene

1990-01-01T23:59:59.000Z

212

IWater Processing and Waste Management SystemsIntegrated System Health Management 2007 Phase II  

E-Print Network [OSTI]

SBIR SBIR 44 45 IWater Processing and Waste Management SystemsIntegrated System Health Management valuable and, in some cases, critical features for Integrated System Health Management (ISHM) developersDE DP) to TRL 6 or higher. To facilitate Phase III NASA transition, the second program goal is deploying

213

Redundant marine engine control system  

SciTech Connect (OSTI)

An electro-mechanical engine control system is described for the shift and throttle functions of marine engines which comprises an electronically-controlled mechanical servo control means coupleable to the shift and throttle functions of a marine engine; a manually-operable ship-board operator engine shift and throttle control means; and an electro-mechanical transfer means coupled to the operator control means and to the servo control means for transferring operator shift and throttle settings to the servo control means, the transfer means being both electronically and mechanically coupled to the servo control means and being constructed and arranged whereby the transfer means will mechanically actuate the servo control means in the absence of electrical power and will electronically actuate the servo control means when electrical power is applied to the servo control means; the transfer means including coupling means preferentially electrically-coupling the operator control means to the servo control means, the coupling means being so constructed and arranged to automatically mechanically-couple the operator control means to the servo control means in the event of electrical power failure and to automatically electrically-couple the operator control means to the servo control means when electrical power is restored.

Burkenpas, R.W.

1993-06-29T23:59:59.000Z

214

Virtual Control Systems Environment (VCSE)  

SciTech Connect (OSTI)

Will Atkins, a Sandia National Laboratories computer engineer discusses cybersecurity research work for process control systems. Will explains his work on the Virtual Control Systems Environment project to develop a modeling and simulation framework of the U.S. electric grid in order to study and mitigate possible cyberattacks on infrastructure.

Atkins, Will

2012-10-08T23:59:59.000Z

215

Virtual Control Systems Environment (VCSE)  

ScienceCinema (OSTI)

Will Atkins, a Sandia National Laboratories computer engineer discusses cybersecurity research work for process control systems. Will explains his work on the Virtual Control Systems Environment project to develop a modeling and simulation framework of the U.S. electric grid in order to study and mitigate possible cyberattacks on infrastructure.

Atkins, Will

2014-02-26T23:59:59.000Z

216

Power management in the EPOS system  

Science Journals Connector (OSTI)

Power management strategies for embedded systems typically rely on static, application driven deactivation of components (e.g. sleep, suspend), or on dynamic voltage and frequency scaling. However, the design and implementation of these strategies in ... Keywords: embedded systems, imprecise computation, power management

Geovani Ricardo Wiedenhoft; Lucas Francisco Wanner; Giovani Gracioli; Antônio Augusto Fröhlich

2008-10-01T23:59:59.000Z

217

U-006:Cisco Network Admission Control Manager Directory Traversal Flaw Lets  

Broader source: Energy.gov (indexed) [DOE]

6:Cisco Network Admission Control Manager Directory Traversal 6:Cisco Network Admission Control Manager Directory Traversal Flaw Lets Remote Users Obtain Potentially Sensitive Information U-006:Cisco Network Admission Control Manager Directory Traversal Flaw Lets Remote Users Obtain Potentially Sensitive Information October 7, 2011 - 8:45am Addthis PROBLEM: Cisco Network Admission Control Manager Directory Traversal Flaw Lets Remote Users Obtain Potentially Sensitive Information PLATFORM: Cisco NAC Manager software versions 4.8.X Cisco NAC Manager software versions 4.7.X and earlier are not affected ABSTRACT: An unauthenticated attacker could exploit this vulnerability to access sensitive information, including password files and system logs, that could be leveraged to launch subsequent attacks. reference LINKS: Cisco Security Advisory Document ID: 113189

218

Blowout control: Response, intervention and management. Part 12  

SciTech Connect (OSTI)

This concluding article of the 12-part series discusses reasons why operators need to establish some type of Well Control Incident Management System (WCIMS). A proposed system is presented, including five major subsystems. For operators who find these intimidating, a minimum program is suggested. The section on blowout control alliances discusses the evolution of oilwell firefighting and how it has become extremely competitive while the number of incidents is less than it used to be. It is suggested that this situation is diluting the experience level within the oilwell firefighting industry and is, thus, generating a need for alliances between operators, contractors and subcontractors--even between operators--where one company`s problem could involve other operators.

Wright, J.W.; Flak, L.H. [Wright Boots and Coots, Houston, TX (United States)

1995-04-01T23:59:59.000Z

219

PIA - Foreign Travel Management System (FTMS) | Department of...  

Office of Environmental Management (EM)

(FTMS) PIA - Foreign Travel Management System (FTMS) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM...

220

Quantitative Quality Management through Defect Prediction and Statistical Process Control  

E-Print Network [OSTI]

Quantitative Quality Management through Defect Prediction and Statistical Process Control Pankaj: To produce high quality software, the final software should have as few defects as possible. The task of quality management in a software project is to plan suitable quality control activities, and properly

Jalote, Pankaj

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Integrated safety management system verification: Volume 2  

SciTech Connect (OSTI)

Department of Energy (DOE) Policy (P) 450.4, Safety Management System Policy, commits to institutionalization of an Integrated Safety Management System (ISMS) throughout the DOE complex. The DOE Acquisition Regulations (DEAR, 48 CFR 970) requires contractors to manage and perform work in accordance with a documented Integrated Safety Management System (ISMS). Guidance and expectations have been provided to PNNL by incorporation into the operating contract (Contract DE-ACM-76FL0 1830) and by letter. The contract requires that the contractor submit a description of their ISMS for approval by DOE. PNNL submitted their proposed Safety Management System Description for approval on November 25,1997. RL tentatively approved acceptance of the description pursuant to a favorable recommendation from this review. The Integrated Safety Management System Verification is a review of the adequacy of the ISMS description in fulfilling the requirements of the DEAR and the DOE Policy. The purpose of this review is to provide the Richland Operations Office Manager with a recommendation for approval of the ISMS description of the Pacific Northwest Laboratory based upon compliance with the requirements of 49 CFR 970.5204(-2 and -78); and to verify the extent and maturity of ISMS implementation within the Laboratory. Further the review will provide a model for other DOE laboratories managed by the Office of Assistant Secretary for Energy Research.

Christensen, R.F.

1998-08-10T23:59:59.000Z

222

Critical issues in process control system security : DHS spares project.  

SciTech Connect (OSTI)

The goals of this event are: (1) Discuss the next-generation issues and emerging risks in cyber security for control systems; (2) Review and discuss common control system architectures; (3) Discuss the role of policy, standards, and supply chain issues; (4) Interact to determine the most pertinent risks and most critical areas of the architecture; and (5) Merge feedback from Control System Managers, Engineers, IT, and Auditors.

Hernandez, Jacquelynne; McIntyre, Annie; Henrie, Morgan

2010-10-01T23:59:59.000Z

223

Meeting Minutes from Automated Home Energy Management System Expert Meeting  

Broader source: Energy.gov (indexed) [DOE]

Home Energy Management System Expert Meeting Home Energy Management System Expert Meeting October 1-2, 2009 AGENDA - Day 1 8:30 - 8:45 Welcome and Debriefing of Building America and Home Energy Management Research- Lew Pratsch, DOE 8:45 - 9:15 Utilities Trends- Smart Grid Projects and Integration With Home Controls - Mike Keesee, SMUD 9:15 - 9:45 Thoughts on Controls System Performance Requirements - Rich Brown, LBL 9:45 - 10:15 Efficiency Trends in Consumer Electronics - Kurtis McKenney, TIAX 10:15 - 10:30 Session Break 10:30 - 11:00 Cloud Computing (Web Data Computing, Data Storage) Trends - Troy Batterberry, Microsoft 11:00- 11:30 Cloud Computing (Web Data Computing, Data Storage) Trends - Tom Sly via Net Conference 11:30 - 12:00 Smart Appliance Trends / Home Area Network Trends - David Najewicz, GE

224

Building systems optimization controls calibration  

SciTech Connect (OSTI)

During the period between May 9, 1994 and June 2, 1994, Engineered Facility Management (EFM) conducted a comprehensive investigation into the condition and operation of the equipment and systems at a major high-rise building owned by a large California bank. The goal of the project was to improve the project`s energy cost per square foot without major system retrofit and capital expenditure. This report is a compilation of the findings, actions taken and recommendations.

NONE

1995-02-01T23:59:59.000Z

225

System Engineering Design [Nuclear Waste Management using  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

System Engineering System Engineering Design Nuclear Fuel Cycle and Waste Management Technologies Overview Modeling and analysis Unit Process Modeling Mass Tracking System Software Waste Form Performance Modeling Safety Analysis, Hazard and Risk Evaluations Development, Design, Operation Overview Systems and Components Development Expertise System Engineering Design Other Major Programs Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE Division on Flickr Nuclear Waste Management using Electrometallurgical Technology System Engineering Design Bookmark and Share Two major pieces of electrometallurgical process equipment are the Electrorefiner and the Cathode Processor. NE personnel have been involved in the conceptual design, final design, procurement, manufacture,

226

Integrated control system and method  

DOE Patents [OSTI]

An integrated control system for use with an engine connected to a generator providing electrical power to a switchgear is disclosed. The engine receives gas produced by a gasifier. The control system includes an electronic controller associated with the gasifier, engine, generator, and switchgear. A gas flow sensor monitors a gas flow from the gasifier to the engine through an engine gas control valve and provides a gas flow signal to the electronic controller. A gas oversupply sensor monitors a gas oversupply from the gasifier and provides an oversupply signal indicative of gas not provided to the engine. A power output sensor monitors a power output of the switchgear and provide a power output signal. The electronic controller changes gas production of the gasifier and the power output rating of the switchgear based on the gas flow signal, the oversupply signal, and the power output signal.

Wang, Paul Sai Keat; Baldwin, Darryl; Kim, Myoungjin

2013-10-29T23:59:59.000Z

227

Management and Control of Foreign Intelligence  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order provides for the management of and assign responsibilities for foreign intelligence activities of DOE. Cancels DOE 5670.1.

1992-01-15T23:59:59.000Z

228

Definition: Outage Management System | Open Energy Information  

Open Energy Info (EERE)

Outage Management System Outage Management System A software application that can process outage reports from a variety of utility operational systems including SCADA, AMI, and customer phone calls, and display outage information to utility operators. The OMS can help a utility interpret outage information and determine where the likely cause of an outage may be. It can also help the utility optimize its service restoration resources.[1] Related Terms advanced metering infrastructure References ↑ https://www.smartgrid.gov/category/technology/outage_management_system [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Outage_Management_System&oldid=502507

229

Pump control system for windmills  

DOE Patents [OSTI]

A windmill control system having lever means, for varying length of stroke of the pump piston, and a control means, responsive to the velocity of the wind to operate the lever means to vary the length of stroke and hence the effective displacement of the pump in accordance with available wind energy, with the control means having a sensing member separate from the windmill disposed in the wind and displaceable thereby in accordance with wind velocity.

Avery, Don E. (45-437 Akimala St., Honolulu, HI 96744)

1983-01-01T23:59:59.000Z

230

Development of Building Automation and Control Systems  

E-Print Network [OSTI]

A design flow for building automation and control systems,’’Development of Building Automation and Control Systems Yangdesign of the build- ing automation system (including the

Yang, Yang; Zhu, Qi; Maasoumy, Mehdi; Sangiovanni-Vincentelli, Alberto

2012-01-01T23:59:59.000Z

231

A Systems Approach to Managing Oil  

E-Print Network [OSTI]

A Systems Approach to Managing Oil Transportation Risk in Prince William Sound Jason R. W. Merrick Received April 21, 2000; revised June 12, 2000; accepted June 26, 2000MANAGING OIL TRANSPORTATION RISK about the safety of oil transportation in the Prince William Sound, Alaska. As a result, a large number

van Dorp, Johan René

232

The Do and Check Processes of an Energy Management System  

Broader source: Energy.gov [DOE]

This presentation covers the Do and Check processes of an Energy Management System. "Do" processes include training, documents, operational control, communication, design, and procurement. "Check" processes include measuring and monitoring, legal requirements, internal auditing, non-conformance (corrective and preventive), and records.

233

Integrating Trust into Grid Resource Management Systems Farag Azzedin and Muthucumaru Maheswaran  

E-Print Network [OSTI]

for providing security in Grid systems including sandboxing, encryption, and other access control for Grid systems and show how the model can be used to incorporate the security implications computing, resource management system, security, trust. 1. Introduction Resource management in Grid systems

Manitoba, University of

234

Integrated Safety Management System Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide provide DOE line management information useful for implementing the provisions of DOE P 450.4A and the requirements and responsibilities of DOE O 450.2. Cancels and supersedes DOE G 450.4-1B and DOE G 450.3-3.

2011-09-29T23:59:59.000Z

235

Computerized Maintenance Management Systems | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Areas » Operations & Maintenance » Computerized Program Areas » Operations & Maintenance » Computerized Maintenance Management Systems Computerized Maintenance Management Systems October 7, 2013 - 9:35am Addthis Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff. Capabilities Typical CMMS functions depend on the complexity of the system chosen. Examples include: Work order generation, prioritization, and tracking by equipment and/or component. Work orders often can be sorted by equipment, date, person responding, etc. Tracking scheduled and unscheduled maintenance activities Storing technical documentation and maintenance procedures by

236

Materials System Inventory Management Practices at Washington...  

Office of Environmental Management (EM)

Materials System Inventory Management Practices at Washington River Protection Solutions OAS-M-15-01 January 2015 U.S. Department of Energy Office of Inspector General Office of...

237

Planning for an Energy Management System  

Broader source: Energy.gov [DOE]

This presentation discusses the Planning step as part of an Energy Management System. Planning involves establishing your energy picture, defining the scope and boundary, setting an energy baseline, and developing action plans.

238

SLAC Management Systems Larry Dardzinski/Ops/x4794  

E-Print Network [OSTI]

SLAC Management Systems PPA Update 24 May 12 Larry Dardzinski/Ops/x4794 #12;Outline · Management · Discussion Page 2 #12;A simple definition of a Management System A management system is the means by which of Management Systems? · Allow your customers and users to efficiently and effectively access your services

Wechsler, Risa H.

239

UNCLASSIFIED Nuclear Materials Management & Safeguards System  

National Nuclear Security Administration (NNSA)

Nuclear Materials Management & Safeguards System Nuclear Materials Management & Safeguards System CHANGE OF PROJECT NUMBER UPDATE PROJECT Project Number: Title: Date Valid: Date Deactivated: Classification Codes: Project Number: Project Title: Associated Materials: Programmatic RIS Previous Project Number(s) Status Code Allotment Code (S=Supplier, U=User) I authorize that the information listed above is for the NMMSS Program to use as part of the project number conversion process for this facility.

240

Position feedback control system  

DOE Patents [OSTI]

Disclosed is a system and method for independently evaluating the spatial positional performance of a machine having a movable member, comprising an articulated coordinate measuring machine comprising: a first revolute joint; a probe arm, having a proximal end rigidly attached to the first joint, and having a distal end with a probe tip attached thereto, wherein the probe tip is pivotally mounted to the movable machine member; a second revolute joint; a first support arm serially connecting the first joint to the second joint; and coordinate processing means, operatively connected to the first and second revolute joints, for calculating the spatial coordinates of the probe tip; means for kinematically constraining the articulated coordinate measuring machine to a working surface; and comparator means, in operative association with the coordinate processing means and with the movable machine, for comparing the true position of the movable machine member, as measured by the true position of the probe tip, with the desired position of the movable machine member.

Bieg, Lothar F. (Albuquerque, NM); Jokiel, Jr., Bernhard (Albuquerque, NM); Ensz, Mark T. (Albuquerque, NM); Watson, Robert D. (Tijeras, NM)

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

International Rectifier Power Control Systems | Open Energy Information  

Open Energy Info (EERE)

Rectifier Power Control Systems Rectifier Power Control Systems Jump to: navigation, search Name International Rectifier Power Control Systems Place El Segundo, California Zip 90245 Product Originally a division of International Rectifier Corporation manufacturing semiconductor and module components for power management products. References International Rectifier Power Control Systems[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. International Rectifier Power Control Systems is a company located in El Segundo, California . References ↑ "International Rectifier Power Control Systems" Retrieved from "http://en.openei.org/w/index.php?title=International_Rectifier_Power_Control_Systems&oldid=347055"

242

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

285: Transmission System Vegetation Management Program 285: Transmission System Vegetation Management Program EIS-0285: Transmission System Vegetation Management Program SUMMARY Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure I-1). The seven states offer a great diversity of vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and neighboring members of the public, and interfere with our ability to maintain these facilities. We need to keep vegetation a safe distance away from our electric power facilities and control noxious weeds at our

243

Next-Generation Distributed Power Management for Photovoltaic Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Next-Generation Distributed Power Management for Photovoltaic Systems Next-Generation Distributed Power Management for Photovoltaic Systems Speaker(s): Jason Stauth Date: July 29, 2011 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Steven Lanzisera In recent years, the balance of systems (BOS) side of photovoltaic (PV) energy has become a major focus in the effort to drive solar energy towards grid parity. The power management architecture has expanded to include a range of distributed solutions, including microinverters and 'micro' DC-DC converters to solve problems with mismatch (shading), expand networking and control, and solve critical BOS issues such as fire safety. This talk will introduce traditional and distributed approaches for PV systems, and will propose a next-generation architecture based on a new

244

The design and implementation of the buffer manager for an experimental relational database management system  

E-Print Network [OSTI]

Buffer management is an essential component of database management. This thesis presents a design and implementation of the buffer manager for an experimental relational database management system. The relationship and difference between database...

Li, Zaichun

2012-06-07T23:59:59.000Z

245

PIA - HSS Electronic Visitor Management System (HSEVMS) | Department...  

Office of Environmental Management (EM)

- HSS Electronic Visitor Management System (HSEVMS) More Documents & Publications PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL PeopleSoft - Human...

246

Earned Value Management System (EVMS) and Project Analysis Standard...  

Broader source: Energy.gov (indexed) [DOE]

Management System (EVMS) and Project Analysis Standard Operating Procedure (EPASOP)- March 2014 Earned Value Management System (EVMS) and Project Analysis Standard Operating...

247

Quality Management Systems for Zero Energy Ready Home Webinar...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Below is the text version...

248

Office of Personnel Management (OPM) Billing System PIA, Office...  

Office of Environmental Management (EM)

Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and...

249

V-132: IBM Tivoli System Automation Application Manager Multiple...  

Energy Savers [EERE]

32: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 -...

250

Concept for Management of the Future Electricity System (Smart...  

Open Energy Info (EERE)

Management of the Future Electricity System (Smart Grid Project) Jump to: navigation, search Project Name Concept for Management of the Future Electricity System Country Denmark...

251

Security Analysis and Project Management Systems | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Security Analysis and Project Management Systems SHARE Security Analysis and Project Management Systems ORNL brings together the subject matter experts with programmers to design,...

252

Introduction to an Energy Management System | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

& Publications The Do and Check Processes of an Energy Management System Planning for an Energy Management System Becoming a Certified Practitioner or a Certified Energy Engineer...

253

Building Energy Monitoring System: Making Energy Manageable  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building Energy Monitoring System: Making Energy Manageable Building Energy Monitoring System: Making Energy Manageable Speaker(s): Bob Hunter Date: July 21, 2006 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Peng Xu For any line-item expense to be managed, it must first be manageable. In most organizations, this means bringing that expense into the budget/forecast/variance cycle at the department and individual level. While energy costs are the second fastest growing for most organizations, they have simply received a pass on individual accountability. TrendPoint provides a patented system for monitoring energy at the department and user-level. By monitoring each circuit, we assign a circuit to a user, each user to a group and each group to a site. Energy budgets can then be created and assigned to departments, allowing energy costs become a part of

254

System Management Software for Virtual Environments  

SciTech Connect (OSTI)

Recently there has been an increased interest in the use of system-level virtualization using mature solutions such as Xen, QEMU, or VMWare. These virtualization platforms are being used in distributed and parallel environments including high performance computing. The use of virtual machines within such environments introduces new challenges to system management. These include tedious tasks such as deploying para-virtualized host operating systems to support virtual machine execution or virtual overlay networks to connect these virtual machines. Additionally, there is the problem of machine definition and deployment, which is complicated by differentiation in the underlying virtualization technology. This paper discusses tools for the deployment and management of both host operating systems and virtual machines in clusters. We begin with an overview of system-level virtualization and move on to a description of tools that we have developed to aid with these environments. These tools extend prior work in the area of cluster installation, configuration and management.

Vallee, Geoffroy R [ORNL; Naughton, III, Thomas J [ORNL; Scott, Stephen L [ORNL

2007-01-01T23:59:59.000Z

255

Seamless Energy Management Systems Part I: Assessment of Energy  

E-Print Network [OSTI]

Seamless Energy Management Systems Part I: Assessment of Energy Management Systems and Key to Engineer the Future Electric Energy System #12;#12;Seamless Energy Management Systems Part I: Assessment of Energy Management Systems and Key Technological Requirements Final Project Report Project Faculty Team

256

BATTLEFIELD NETWORK APPLICATIONS OF THE SHAMAN MANAGEMENT SYSTEM  

E-Print Network [OSTI]

BATTLEFIELD NETWORK APPLICATIONS OF THE SHAMAN MANAGEMENT SYSTEM Adarshpal S. Sethi Dong Zhu Vasil Architecture for MANagement). This management system developed at the Network Management Laboratory framework to facili- tate the management of distributed systems [1], [2], [3], [4]. This architecture allows

Sethi, Adarshpal

257

Magnetohydrodynamic boundary layer control system  

SciTech Connect (OSTI)

Accordingly, it is an object of the present invention to provide an active boundary layer control system which is lightweight, operates with low in put power, and occupies little physical space. It is a further object of the invention to provide a boundary layer control system which is robust and can be operated in a damaged condition without creating a hazard to the vehicle. It is yet object of the invention to provide a magnetohydrodynamic (MHD) boundary layer control system for marine vehicles which provides a force directly on the water adjacent to the vehicle hull to provide flow separation control. The invention is a boundary layer control system using magnetic and electric fields interaction to providea driving force to energize boundary layer flow around a marine vehicle. A plurality of magnets are located circumferentially around the hull. Seawater electrodes are placed between each of the magnets and between the poles of each magnet. The resulting interaction of the electric and magnetic fields produces a Lorentz force which reduces the turbulence and may even relaminarize the flow in the boundary layer.

Meng, J.C.

1993-02-11T23:59:59.000Z

258

Concept for Management of the Future Electricity System (Smart Grid  

Open Energy Info (EERE)

Concept for Management of the Future Electricity System (Smart Grid Concept for Management of the Future Electricity System (Smart Grid Project) Jump to: navigation, search Project Name Concept for Management of the Future Electricity System Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

259

Particulate Emissions Control by Advanced Filtration Systems...  

Broader source: Energy.gov (indexed) [DOE]

Particulate Emissions Control by Advanced Filtration Systems or GDI Engines Particulate Emissions Control by Advanced Filtration Systems or GDI Engines 2013 DOE Hydrogen and Fuel...

260

Dynamic thermal management in chip multiprocessor systems  

E-Print Network [OSTI]

- mal Management (PDTM) based on Application-based Thermal Model (ABTM) and Core-based Thermal Model (CBTM) in the multicore systems. Based on predicted temperature from ABTM and CBTM, the proposed PDTM can maintain the system temperature below a desired...

Liu, Chih-Chun

2009-05-15T23:59:59.000Z

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

PHEV Engine Control and Energy Management Strategy  

Broader source: Energy.gov (indexed) [DOE]

(RealTime Software and Hardware prototype control strategies development tools) - Matlab and Simulink (modeling environment) - Autonomie (vehicle and powertrain models) *...

262

Strategic Planning System for Exotic Game Management  

E-Print Network [OSTI]

. Jerry Stuth The paradigm of indiscriminate introduction of exotic ungulates has escalated the need for ecological and biological understanding of nonindigenous species. Management of any species or animal enterprise is a dynamic process..., and requires ecological considerations as well as economic constraints. The initial framework of Strategic Planning System for Exotic Game (SPSEG) may allow proactive management of animal enterprises and help mediate the often conflicting short term needs...

Lubbering, Jeanne Marie Petrofes

2012-06-07T23:59:59.000Z

263

Vol 2, Integrated Safety Management System Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is approved for use by the Office of Environment, Safety and Health (EH) and is available for use by all DOE components and their contractors. This Guide is a consensus document coordinated by EH and prepared under the direction of the DOE Safety Management Implementation Team (SMIT). Canceled by DOE G 450.4-1B.

1999-05-27T23:59:59.000Z

264

Tank waste remediation system systems engineering management plan  

SciTech Connect (OSTI)

This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation Systems (TWRS) implementation of U.S. Department of Energy (DOE) Systems Engineering (SE) policy provided in Tank Waste Remediation System Systems Engineering Management Policy, DOE/RL letter, 95-RTI-107, Oct. 31, 1995. This SEMP defines the products, process, organization, and procedures used by the TWRS Program to accomplish SE objectives. This TWRS SEMP is applicable to all aspects of the TWRS Program and will be used as the basis for tailoring SE to apply necessary concepts and principles to develop and mature the processes and physical systems necessary to achieve the desired end states of the program.

Peck, L.G.

1996-02-06T23:59:59.000Z

265

Secure control systems with application to cyber-physical systems  

Science Journals Connector (OSTI)

Control systems are computer-based systems with networked units consisting of sensors, actuators, control processing units, and communication devices. The role of control system is to interact, monitor, and control physical processes. Reactive power ... Keywords: SCADA systems, cyber-physical systems, secure control, security

Jin Dong; Seddik. M. Djouadi; James J. Nutaro; Teja Kuruganti

2014-04-01T23:59:59.000Z

266

Open architecture in control system integration  

SciTech Connect (OSTI)

Open architecture offers the manufacturing community a number of advantages in the integration of future machine control systems. Among these advantages is the ability to upgrade and take advantage of innovative new control strategies. A key enabling technology in open architecture control systems is the digital signal processor (DSP). DSPs can be used to provide a complete control system or can enhance the computational capability of larger control systems. The use of DSPs in the integration of open architecture control systems is discussed, including their impact on reliability and control system functionality. In addition, the role of DSPs in control system architecture is addressed.

Wysor, R.W. [Oak Ridge National Lab., TN (United States); Carnal, C.L. [Tennessee Technological Univ., Cookeville, TN (United States); Igou, R.E. [Oak Ridge Y-12 Plant, TN (United States)

1993-09-01T23:59:59.000Z

267

Cloud-Based Transportation Management System Delivers Savings  

Broader source: Energy.gov [DOE]

DOE’s cloud based transportation management system (ATLAS) offers dramatically enhanced capabilities and modernization.

268

Management Controls over the Department of Energy's Uranium Leasing  

Broader source: Energy.gov (indexed) [DOE]

Management Controls over the Department of Energy's Uranium Leasing Management Controls over the Department of Energy's Uranium Leasing Program, OAS-M-08-05 Management Controls over the Department of Energy's Uranium Leasing Program, OAS-M-08-05 The Department of Energy's Uranium Leasing Program was established by the Atomic Energy Act of 1954 to develop a supply of domestic uranium to meet the nation's defense needs. Pursuant to the Act, the Program leases tracts of land to private sector entities for the purpose of mining uranium ore. According to Department officials, one purpose of the Program is to obtain a fair monetary return to the Government. The Program is administered by the Department's Office of Legacy Management through a contractor. The uranium leases issued by the Department include two types of royalty

269

Tank waste remediation system systems engineering management plan  

SciTech Connect (OSTI)

This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.

Peck, L.G.

1998-01-08T23:59:59.000Z

270

System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)  

SciTech Connect (OSTI)

This document provides configuration management for the Distributed Control System (DCS), the Gaseous Effluent Monitoring System (GEMS-100) System, the Heating Ventilation and Air Conditioning (HVAC) Programmable Logic Controller (PLC), the Canister Receiving Crane (CRC) CRN-001 PLC, and both North and South vestibule door interlock system PLCs at the Canister Storage Building (CSB). This procedure identifies and defines software configuration items in the CSB control and monitoring systems, and defines configuration control throughout the system life cycle. Components of this control include: configuration status accounting; physical protection and control; and verification of the completeness and correctness of these items.

GARRISON, R.C.

2000-11-28T23:59:59.000Z

271

Input Management of Production Systems  

Science Journals Connector (OSTI)

...laboratory study. The open systems of real-world environments cannot be enclosed...out of New York City. Long-term sustainable solutions are to be found in waste...maintain drinking water quality, real estate and other development on the watershed...

EUGENE P. ODUM

1989-01-13T23:59:59.000Z

272

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

February 20, 2003 February 20, 2003 EIS-0285-SA-123: Supplement Analysis Transmission System Vegetation Management Program February 19, 2003 EIS-0285-SA-126: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-125: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-124: Supplement Analysis Transmission System Vegetation Management Program February 12, 2003 EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program February 10, 2003 EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington January 16, 2003 EIS-0285-SA-117: Supplement Analysis Transmission System Vegetation Management Program December 24, 2002

273

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

July 19, 2002 July 19, 2002 EIS-0285-SA-96: Supplement Analysis Transmission System Vegetation Management Program, Snohomish District Substations July 19, 2002 EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program July 9, 2002 EIS-0285-SA-81: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-84: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-80: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-78: Supplement Analysis Transmission System Vegetation Management Program June 21, 2002 EIS-0285-SA-75: Supplement Analysis Transmission System Vegetation Management Program May 31, 2002 EIS-0285-SA-58: Supplement Analysis

274

A Network Congestion Control Approach to Airport Departure Management  

E-Print Network [OSTI]

for a generic airport and then validate it using surface surveillance data from Boston Logan InternationalA Network Congestion Control Approach to Airport Departure Management Harshad Khadilkar and Hamsa at airports, by posing the problem in a network congestion control framework. We develop a network model

Gummadi, Ramakrishna

275

Project Management and Systems Support | National Nuclear Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Management and Systems Support | National Nuclear Security Project Management and Systems Support | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Project Management and Systems Support Home > About Us > Our Operations > Acquisition and Project Management > Project Management and Systems Support Project Management and Systems Support Goal

276

Project Management and Systems Support | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Project Management and Systems Support | National Nuclear Security Project Management and Systems Support | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Project Management and Systems Support Home > About Us > Our Operations > Acquisition and Project Management > Project Management and Systems Support Project Management and Systems Support Goal

277

1993 baseline solid waste management system description  

SciTech Connect (OSTI)

Pacific Northwest Laboratory has prepared this report under the direction of Westinghouse Hanford Company. The report provides an integrated description of the system planned for managing Hanford`s solid low-level waste, low-level mixed waste, transuranic waste, and transuranic mixed waste. The primary purpose of this document is to illustrate a collective view of the key functions planned at the Hanford Site to handle existing waste inventories, as well as solid wastes that will be generated in the future. By viewing this system as a whole rather than as individual projects, key facility interactions and requirements are identified and a better understanding of the overall system may be gained. The system is described so as to form a basis for modeling the system at various levels of detail. Model results provide insight into issues such as facility capacity requirements, alternative system operating strategies, and impacts of system changes (ie., startup dates). This description of the planned Hanford solid waste processing system: defines a baseline system configuration; identifies the entering waste streams to be managed within the system; identifies basic system functions and waste flows; and highlights system constraints. This system description will evolve and be revised as issues are resolved, planning decisions are made, additional data are collected, and assumptions are tested and changed. Out of necessity, this document will also be revised and updated so that a documented system description, which reflects current system planning, is always available for use by engineers and managers. It does not provide any results generated from the many alternatives that will be modeled in the course of analyzing solid waste disposal options; such results will be provided in separate documents.

Armacost, L.L.; Fowler, R.A.; Konynenbelt, H.S.

1994-02-01T23:59:59.000Z

278

The Information System The ideal system manager has the curiosity of a cat,  

E-Print Network [OSTI]

Chapter 2 The Information System Manager #12;The ideal system manager has the curiosity of a cat manage? As a property level information system manager, you may manage the following 3 types of computer #12;Who should manage the information system? O Patience and good communication skills O Hands

279

Software aspects of energy management systems  

SciTech Connect (OSTI)

This paper is intended to serve the need for an understanding of the role which software plays in energy management systems (EMS), and of the considerations involved in designing, implementing and maintaining such systems. The paper begins with a brief elementary examination of what software is and the types of basic functions it typically performs in EMS applications. Various aspects of EMS software are then explained and discussed, including software architecture, programming language, operating system, data base management, man-machine interface, application software, and communications. In addition to providing a tutorial on the composition and content of EMS software, the paper addresses several related questions, such as the reasons for choosing one programming language over another, the effect of system size on software factors, the extent to which off-the-shelf software components can and should be incorporated in EMS, and the relationship of software to the overall user interface with the systems.

Stinaff, R.D.

1983-06-01T23:59:59.000Z

280

Optimal Design of Remote Terminal Unit (RTU) for Wireless SCADA System for Energy Management  

Science Journals Connector (OSTI)

For energy deficit countries, the design of Supervisory Control and Data Acquisition (SCADA) based energy management systems for optimal distribution is of high interest. Such design involves development of Remote Terminal Unit (RTU) which is considered ... Keywords: Field Programmable Gate Array (FPGA), Programmable Logic Controller (PLC), Remote Terminal Unit (RTU), Supervisory Control and Data Acquisition (SCADA), Tele-Control Interface (TCI), Wireless Communication

Muhammad Aamir; Javier Poncela; Muhammad Aslam Uqaili; B. S. Chowdhry; Nishat Ahmad Khan

2013-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Control and Management of Mesquite on Rangeland.  

E-Print Network [OSTI]

. Heavy anchor chains 200 to 500 feet in length and weighing 40 to 65 pounds per foot drawn in aU-shape between two large crawler-type tractors can be used to accomplish mesquite-control operation. Effective control can be obtained by anchoring one end... of the chain to a large tree and moving in a circle pulling the chain with only one tractor. The single-loop chain pulled two ways , opposite directions, gives the best mesquite uprooting and ROLLING CHOPPERS breakages of the lateral roots. One-way chai...

Hoffman, Garlyn O.

1981-01-01T23:59:59.000Z

282

Automatic Control Technology in the HVAC System  

Science Journals Connector (OSTI)

In the field of VAV air-conditioning system (Variable Air Volume, VAV) control theory and practical study, the paper analyzed the methods used by the China's VAV control procedures including Static Pressure Control, Variable Pressure Control and Total ...

Ren Tao; Gao Jingmin; Jia Wenwen

2009-01-01T23:59:59.000Z

283

HVDC control developments - addressing system requirements  

SciTech Connect (OSTI)

This article describes typical high voltage direct current (HVDC) control systems and some of the new developments in the control area. HVDC control systems are showing their flexible characteristics as demonstrated, for example, by the new modulation, torsional damping, and alternating current voltage and reactive power controllers. Extensive studies are conducted to design and integrate such controllers into HVDC systems and to assure against any detrimental interactions within the total control system. 8 figures.

Hauth, R.L.; Patel, H.S.; Piwko, R.J.

1984-01-01T23:59:59.000Z

284

Earned Value Management System (EVMS) Certifications | U.S. DOE...  

Office of Science (SC) Website

Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS)...

285

Implementation Guide for Integrating Pollution Prevention into Environmental Management Systems  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide suggests approaches to integrating pollution prevention into Integrated Safety Management/Environmental Management Systems. Canceled by DOE N 251.82.

2005-05-27T23:59:59.000Z

286

Heat engine generator control system  

DOE Patents [OSTI]

An electrical power generation system includes a heat engine having an output member operatively coupled to the rotor of a dynamoelectric machine. System output power is controlled by varying an electrical parameter of the dynamoelectric machine. A power request signal is related to an engine speed and the electrical parameter is varied in accordance with a speed control loop. Initially, the sense of change in the electrical parameter in response to a change in the power request signal is opposite that required to effectuate a steady state output power consistent with the power request signal. Thereafter, the electrical parameter is varied to converge the output member speed to the speed known to be associated with the desired electrical output power.

Rajashekara, Kaushik (Carmel, IN); Gorti, Bhanuprasad Venkata (Towson, MD); McMullen, Steven Robert (Anderson, IN); Raibert, Robert Joseph (Fishers, IN)

1998-01-01T23:59:59.000Z

287

Heat engine generator control system  

DOE Patents [OSTI]

An electrical power generation system includes a heat engine having an output member operatively coupled to the rotor of a dynamoelectric machine. System output power is controlled by varying an electrical parameter of the dynamoelectric machine. A power request signal is related to an engine speed and the electrical parameter is varied in accordance with a speed control loop. Initially, the sense of change in the electrical parameter in response to a change in the power request signal is opposite that required to effectuate a steady state output power consistent with the power request signal. Thereafter, the electrical parameter is varied to converge the output member speed to the speed known to be associated with the desired electrical output power. 8 figs.

Rajashekara, K.; Gorti, B.V.; McMullen, S.R.; Raibert, R.J.

1998-05-12T23:59:59.000Z

288

UNIVERSITY OF PITTSBURGH AT GREENSBURG Management -Information Systems  

E-Print Network [OSTI]

UNIVERSITY OF PITTSBURGH AT GREENSBURG Management - Information Systems u n d e r g r a d u a t e p r o g r a m Management - Information Systems 48 credits Bachelor of Science Management - Information Accounting MGMT 1818 Management Science INFSCI 0010 Introduction to Information Systems and Society Area

Sibille, Etienne

289

Management and Safety of Transportation Systems  

E-Print Network [OSTI]

Management and Safety of Transportation Systems University Transportation Center for Alabama A N N@eng.ua.edu www.eng.ua.edu Editors: James Cruise, Ph.D. Barbara Moore University Transportation Center for Alabama Transportation Center for Alabama (UTCA). The contents of this Annual Report reflect the views of the editors

Carver, Jeffrey C.

290

Policy Management for Networked Systems and Applications  

E-Print Network [OSTI]

Policy Management for Networked Systems and Applications Dakshi Agrawal, Seraphin Calo, James Giles {agrawal,scalo,gilesjam,kangwon,dverma}@us.ibm.com Abstract In this paper, we present a novel policy and administrative domains. The proposed policy middleware provides a standard infrastructure for the creation

Lee, Kang-Won

291

WORKLOAD ADAPTATION IN AUTONOMIC DATABASE MANAGEMENT SYSTEMS  

E-Print Network [OSTI]

in Autonomic DBMSs", Proceedings of the 2nd International Workshop on Self-Managing Database Systems (SMDB 2007 to meet its Service Level Objectives (SLOs). It is a challenge to adapt multiple workloads with complex scheduler that performs workload adaptation in a DBMS, as the test bed to prove the effectiveness

292

Integrated Safety, Environmental, & Emergency Management Systems (ISEEMS)  

SciTech Connect (OSTI)

Sandia`s Risk Management and NEPA Department recognized the need for hazard and environmental data analysis and management to support the line managers` need to know, understand, manage and document the hazards inherent in their facilities and activities. ISEEMS (Integrated Safety, Environmental, & Emergency Management System) was developed in response to this need. ISEEMS takes advantage of the fact that there is some information needed for the NEPA process that is also needed for the safety documentation process. The ISEEMS process enables Sandia to identify and manage hazards and environmental concerns at a level of effort commensurate with the hazards themselves by adopting a necessary and sufficient (graded) approach to compliance. The Preliminary Hazard Screening module of ISEEMS determines the facility or project activity hazard classification and facility designation. ISEEMS` geo-referenced icon allows immediate, visual integration of hazard information across geographic boundaries resulting in significant information compression. At Sandia, ISEEMS runs on the Sandia Internal Restricted Network, in an MS-Windows environment on standard PC hardware. The possibility of transporting ISEEMS to a ``WEB-like`` environment is being explored.

Silver, R.; Langwell, G.; Thomas, C.; Coffing, S.

1996-05-01T23:59:59.000Z

293

ETTP Security Access Control System (ESACS) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

ETTP Security Access Control System (ESACS) ETTP Security Access Control System (ESACS) ETTP Security Access Control System (ESACS) ETTP Security Access Control System (ESACS) More...

294

Survey and Taxonomy of Grid Resource Management Systems Chaitanya Kandagatla  

E-Print Network [OSTI]

Survey and Taxonomy of Grid Resource Management Systems Chaitanya Kandagatla University of Texas, Austin Abstract The resource management system is the central component of a grid system. This paper management architectures of popular contemporary grid systems. 1. Introduction Grid systems are inter

Browne, James C.

295

Joint Environmental Management System (EMS) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) The environmental management system (EMS) has two areas of focus: environmental compliance and environmental sustainability. The environmental compliance aspect of the EMS consists of regulatory compliance and monitoring programs that implement federal, state, local, and tribal requirements; agreements; and permits under the Legacy Management contract. The environmental sustainability aspect promotes and integrates sustainability initiatives such as energy and natural resource conservation, waste minimization, green construction, and use of eco-friendly products and services into all phases of work. U.S. Department of Energy (DOE) Office of Legacy Management (LM) EMS was

296

Management Controls over Performance Fees in the Idaho National Laboratory  

Broader source: Energy.gov (indexed) [DOE]

Management Controls over Performance Fees in the Idaho National Management Controls over Performance Fees in the Idaho National Laboratory Contract, OAS-M-06-07 Management Controls over Performance Fees in the Idaho National Laboratory Contract, OAS-M-06-07 The Department of Energy (Department) did not always effectively and Fees use performance measures and fees to appropriately reward contractor performance. Specifically, the Department allocated approximately $1.1 million for 3 of the 27 performance measures and fees for Fiscal Year (FY) 2005, which were disproportionately high for the work performed. Four of the 49 measures and fees established for FY 2006 provided the contractor the opportunity to earn $1 million under similar circumstances. Also, some of the performance measures worth $460,000, were implemented well

297

Introducing Energy Management Systems into Smaller Facilities  

E-Print Network [OSTI]

Many small and medium sized commercial buildings are energy hogs. Typically they were designed and built to meet low first cost criteria. Control system capability is usually minimal, insulation is thin, glass areas are large, and HVAC equipment...

Lawrence, J. A.

1983-01-01T23:59:59.000Z

298

Microsoft Word - Management Control Report Cover.doc  

Broader source: Energy.gov (indexed) [DOE]

Selected Facility Contractor Travel Expenses OAS-M-07-03 April 2007 Department of Energy Washington, DC 20585 April 26, 2007 MEMORANDUM FOR THE PRINCIPAL DEPUTY ADNLINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION AND CHIEF WERATING OFFICER, OFFICE OF SCIENCE FROM: Assistant Inspector General for Financial, Technology and Corporate Audits Office of Inspector General INFORMATION: Audit Report on "Management Controls over Selected Facility Contractor Travel Expenses" BACKGROUND The Department of Energy (Department) relies on contractors to manage and operate its major I'acilities. Management contractors' business-related travel, which includes domestic and international trips to and from field sites to attend meetings and conferences and to perform

299

Managing Manure with Biogas Recovery Systems  

E-Print Network [OSTI]

such as natural gas, propane, and fuel oil. Biogas can also be flared to control odor if energy recovery: a digester, a gas-handling system, a gas-use device, and a manure storage tank or pond to hold the treat- ed.g., storage tanks, storage ponds, lagoons). These benefits include odor control, improved air and water

Mukhtar, Saqib

300

Environmental remediation and waste management information systems  

SciTech Connect (OSTI)

The purpose of this paper is to document a few of the many environmental information systems that currently exist worldwide. The paper is not meant to be a comprehensive list; merely a discussion of a few of the more technical environmental database systems that are available. Regulatory databases such as US Environmental Protection Agency`s (EPA`s) RODS (Records of Decision System) database [EPA, 1993] and cost databases such as EPA`s CORA (Cost of Remedial Action) database [EPA, 1993] are not included in this paper. Section 2 describes several US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) information systems and databases. Section 3 discusses several US EPA information systems on waste sites and technologies. Section 4 summarizes a few of the European Community environmental information systems, networks, and clearinghouses. And finally, Section 5 provides a brief overview of Geographical Information Systems. Section 6 contains the references, and the Appendices contain supporting information.

Harrington, M.W.; Harlan, C.P.

1993-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

HAMMER COURSEWARE MANAGEMENT SYSTEM (CMS) SYSTEM DEVELOPMENT & IMPLEMENTATION  

SciTech Connect (OSTI)

HAMMER Courseware Management System (HAMMERCMS) is the official name of the system Fluor Hanford, Inc., uses to facilitate development of, deliver, and track training presented in some electronic form (mainly, web-based training) to Hanford Site employees, subcontractors, and vendors.

GARDNER, P.R.

2006-04-28T23:59:59.000Z

302

Marathon pipe line's new control system  

SciTech Connect (OSTI)

A new control system for Marathon Pipe Line Company's 4200 mile long oil pipeline is described. The pipeline transports 1 1/2 million barrels/day of crude oil and refined products. A comprehensive, centralized computer control system in Findlay, Ohio was developed to provide precision control of the system. Marathon is almost finished with the supervisory control and data acquisition system which can almost instantaneously control fluid movements throughout the network with the push of a few buttons.

Ross, J.

1983-03-01T23:59:59.000Z

303

PIA - Human Resources Management System | Department of Energy  

Office of Environmental Management (EM)

System PIA - Human Resources Management System More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change...

304

Recommended Security Controls for Federal Information Systems...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NIST 800-53 Revision 3 + Draft Revision 4 Recommended Security Controls for Federal Information Systems and Organizations Note: CNTL NO. Table D2: Security Control Base Lines...

305

SP 800-82. Guide to Industrial Control Systems (ICS) Security: Supervisory Control and Data Acquisition (SCADA) systems, Distributed Control Systems (DCS), and other control system configurations such as Programmable Logic Controllers (PLC)  

Science Journals Connector (OSTI)

The purpose of this document is to provide guidance for securing industrial control systems (ICS), including supervisory control and data acquisition (SCADA) systems, distributed control systems (DCS), and other systems performing control functions. ... Keywords: Cyber-physcial systems, ICS, Industrial Control Systems, SCADA, Supervisory Control and Data Acquisition, security controls, threats, vulnerabilities

Keith A. Stouffer; Joseph A. Falco; Karen A. Scarfone

2011-06-01T23:59:59.000Z

306

Use of energy management systems for performance monitoring of industrial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Use of energy management systems for performance monitoring of industrial Use of energy management systems for performance monitoring of industrial load-shaping measures Title Use of energy management systems for performance monitoring of industrial load-shaping measures Publication Type Journal Article Year of Publication 1988 Authors Akbari, Hashem, Mashuri Warren, Anibal De T. Almeida, Deborah J. Connell, and Jeffrey P. Harris Journal Energy Volume 13 Pagination 253-263 Abstract We have studied the use of industrial energy management and control systems (EMCSs) for monitoring the performance of electric load-shaping measures in three of California's most electricity-intensive and rapidly growing industrial sectors: food, plastics, and computing equipment and electronics. In this paper, we summarize current load-shaping strategies, report on the current use of EMCSs in selected industries, and recommend ways for electric utility companies to verify the potential of EMCSs for performance monitoring. We conclude that EMCSs can be used to collect and store data for evaluating industrial load shaping. Some sophisticated EMCSs are currently being used for this purpose, mostly in larger electronics firms. Most EMCSs now available need to be customized to monitor a particular facility. We also conclude that electric utility companies can encourage the use of EMCSs for performance monitoring by helping to educate their industrial customers about EMCSs, establishing protocols to standardize communication between EMCSs, and testing EMCSs with data-logging functions at demonstration sites.

307

Used Fuel Management System Interface Analyses - 13578  

SciTech Connect (OSTI)

Preliminary system-level analyses of the interfaces between at-reactor used fuel management, consolidated storage facilities, and disposal facilities, along with the development of supporting logistics simulation tools, have been initiated to provide the U.S. Department of Energy (DOE) and other stakeholders with information regarding the various alternatives for managing used nuclear fuel (UNF) generated by the current fleet of light water reactors operating in the United States. An important UNF management system interface consideration is the need for ultimate disposal of UNF assemblies contained in waste packages that are sized to be compatible with different geologic media. Thermal analyses indicate that waste package sizes for the geologic media under consideration by the Used Fuel Disposition Campaign may be significantly smaller than the canisters being used for on-site dry storage by the nuclear utilities. Therefore, at some point along the UNF disposition pathway, there could be a need to repackage fuel assemblies already loaded and being loaded into the dry storage canisters currently in use. The implications of where and when the packaging or repackaging of commercial UNF will occur are key questions being addressed in this evaluation. The analysis demonstrated that thermal considerations will have a major impact on the operation of the system and that acceptance priority, rates, and facility start dates have significant system implications. (authors)

Howard, Robert; Busch, Ingrid [Oak Ridge National Laboratory, P.O. Box 2008, Bldg. 5700, MS-6170, Oak Ridge, TN 37831 (United States)] [Oak Ridge National Laboratory, P.O. Box 2008, Bldg. 5700, MS-6170, Oak Ridge, TN 37831 (United States); Nutt, Mark; Morris, Edgar; Puig, Francesc [Argonne National Laboratory (United States)] [Argonne National Laboratory (United States); Carter, Joe; Delley, Alexcia; Rodwell, Phillip [Savannah River National Laboratory (United States)] [Savannah River National Laboratory (United States); Hardin, Ernest; Kalinina, Elena [Sandia National Laboratories (United States)] [Sandia National Laboratories (United States); Clark, Robert [U.S. Department of Energy (United States)] [U.S. Department of Energy (United States); Cotton, Thomas [Complex Systems Group (United States)] [Complex Systems Group (United States)

2013-07-01T23:59:59.000Z

308

{Control of Residential Load Management Networks Using Real Time Pricing  

E-Print Network [OSTI]

Modular and Extensible Systemic Simulation of Demand Response Networks 2.1 Introduction Thermostatically controlled devices, such as heating ventilation and air conditioning (HVAC), refrigerators,

Burke, William Jerome

2010-01-01T23:59:59.000Z

309

Studies on Integrated Management and Technology System of Cycling Logistics  

Science Journals Connector (OSTI)

The frame on integrated management system of cycling logistics is constructed. The content, function, structure, realization process, operation model of the business and technical systems that consist of cycling logistics integrated management are preliminarily ... Keywords: Cycling Logistics, integrated management, technology System, Service System

Huan Zhang; Zhong Cheng; Yi Lu

2008-10-01T23:59:59.000Z

310

Rule-Based Energy Management System Applied to Large Industrial Facilities  

E-Print Network [OSTI]

Deregulation of electricity and rising fuel costs are causing renewed interest in Energy Management Systems (EMS). This paper details the results of integrating a rule-based EMS controller at a Pulp and Paper Mill and additional findings from...

Gauthier, M.; Childress, R. L.

311

Building Controls and Facilities Management in 21st Century  

SciTech Connect (OSTI)

Managing buildings requires a wide array of skills and tools for building operations, maintenance, engineering, forecasting, budgeting, health, safety, and security. Recent developments in open communication standards for building automation systems (BASs), as well as the pervasive use of Internet and intranet technologies, have created a flood of new options for owners and operators of facilities. The ability to manage facilities over the Internet enables remote monitoring, remote equipment diagnostics, and load aggregation -- all of which require significant data and image transfers in real time. In this paper we present a conceptual design to extend the traditional role of facilities management. The advantages of managing facilities that are distributed over the Internet are also described. Implementation and integration of various facilities management functions (remote monitoring, remote diagnostics, load aggregation, and whole facility optimization) are described as well.

Katipamula, Srinivas (BATTELLE (PACIFIC NW LAB)); Armstrong, Peter R. (BATTELLE (PACIFIC NW LAB)); Brambley, Michael R. (BATTELLE (PACIFIC NW LAB)); Pratt, Robert G. (BATTELLE (PACIFIC NW LAB)); Chassin, David P. (BATTELLE (PACIFIC NW LAB))

2000-01-01T23:59:59.000Z

312

Electricity Demand and Energy Consumption Management System  

E-Print Network [OSTI]

This project describes the electricity demand and energy consumption management system and its application to the Smelter Plant of Southern Peru. It is composted of an hourly demand-forecasting module and of a simulation component for a plant electrical system. The first module was done using dynamic neural networks, with backpropagation training algorithm; it is used to predict the electric power demanded every hour, with an error percentage below of 1%. This information allows management the peak demand before this happen, distributing the raise of electric load to other hours or improving those equipments that increase the demand. The simulation module is based in advanced estimation techniques, such as: parametric estimation, neural network modeling, statistic regression and previously developed models, which simulates the electric behavior of the smelter plant. These modules allow the proper planning because it allows knowing the behavior of the hourly demand and the consumption patterns of the plant, in...

Sarmiento, Juan Ojeda

2008-01-01T23:59:59.000Z

313

Software Controlled Power Management Yung-Hsiang Lu, Tajana Simunic, Giovanni De Micheli  

E-Print Network [OSTI]

Software Controlled Power Management Yung-Hsiang Lu, Tajana Simuni´c, Giovanni De Micheli Computer in either hardware or software. A recent trend on personal computers is to use software to change hardware power states. This paper presents a software architecture that allows system designers to in- vestigate

Simunic, Tajana

314

DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM  

SciTech Connect (OSTI)

The deep hard rock drilling environment induces severe vibrations into the drillstring, which can cause reduced rates of penetration (ROP) and premature failure of the equipment. The only current means of controlling vibration under varying conditions is to change either the rotary speed or the weight-on-bit (WOB). These changes often reduce drilling efficiency. Conventional shock subs are useful in some situations, but often exacerbate the problems. The objective of this project is development of a unique system to monitor and control drilling vibrations in a ''smart'' drilling system. This system has two primary elements: (1) The first is an active vibration damper (AVD) to minimize harmful axial, lateral and torsional vibrations. The hardness of this damper will be continuously adjusted using a robust, fast-acting and reliable unique technology. (2) The second is a real-time system to monitor drillstring vibration, and related parameters. This monitor adjusts the damper according to local conditions. In some configurations, it may also send diagnostic information to the surface via real-time telemetry. The AVD is implemented in a configuration using magnetorheological (MR) fluid. By applying a current to the magnetic coils in the damper, the viscosity of the fluid can be changed rapidly, thereby altering the damping coefficient in response to the measured motion of the tool. Phase I of this program entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype. Phase I of the project was completed by the revised end date of May 31, 2004. The objectives of this phase were met, and all prerequisites for Phase II have been completed.

Martin E. Cobern

2004-08-31T23:59:59.000Z

315

ISO 50001 Conformant Energy Management Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ISO 50001-conformant ISO 50001-conformant Energy Management Systems Aimee McKane Lawrence Berkeley National Laboratory atmckane@lbl.gov 518-782-7002 April 2, 2013 2 | Building Technologies Office eere.energy.gov * Energy efficiency improvements with very favorable payback periods often do not get implemented due to competing organizational priorities * Even projects that are implemented may not be sustained due to lack of supportive operational and maintenance practices Problem: Energy efficiency is not integrated into daily

316

ISO 50001 Conformant Energy Management Systems  

Broader source: Energy.gov (indexed) [DOE]

ISO 50001-conformant ISO 50001-conformant Energy Management Systems Aimee McKane Lawrence Berkeley National Laboratory atmckane@lbl.gov 518-782-7002 April 2, 2013 2 | Building Technologies Office eere.energy.gov * Energy efficiency improvements with very favorable payback periods often do not get implemented due to competing organizational priorities * Even projects that are implemented may not be sustained due to lack of supportive operational and maintenance practices Problem: Energy efficiency is not integrated into daily

317

Definition: Meter Data Management System | Open Energy Information  

Open Energy Info (EERE)

System System Jump to: navigation, search Dictionary.png Meter Data Management System A meter data management system (MDMS) collects and stores meter data from a head-end system and processes that meter data into information that can be used by other utility applications including billing, customer information systems, and outage management systems. The MDMS is a key resource for managing large quantities of meter data.[1] Related Terms system, outage management system References ↑ https://www.smartgrid.gov/category/technology/meter_data_management_system [[Ca LikeLike UnlikeLike You like this.Sign Up to see what your friends like. tegory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Meter_Data_Management_System&oldid=50258

318

U-040: HP-UX System Administration Manager Lets Local Users Gain Elevated  

Broader source: Energy.gov (indexed) [DOE]

0: HP-UX System Administration Manager Lets Local Users Gain 0: HP-UX System Administration Manager Lets Local Users Gain Elevated Privileges U-040: HP-UX System Administration Manager Lets Local Users Gain Elevated Privileges November 17, 2011 - 8:00am Addthis PROBLEM: HP-UX System Administration Manager Lets Local Users Gain Elevated Privileges. PLATFORM: HP-UX B.11.11, B.11.23, B.11.31; running Enterprise Mobility Suite (EMS) prior to A.04.20.11.04_01 ABSTRACT: A local user can obtain elevated privileges on the target system. reference LINKS: HP Support Center Document ID: c03089106 CVE-2011-4159 SecurityTracker Alert ID: 1026331 IMPACT ASSESSMENT: Medium Discussion: A vulnerability was reported in HP-UX System Administration Manager. A local user can obtain elevated privileges on the target system. A local user can gain full control of the target system.

319

U-040: HP-UX System Administration Manager Lets Local Users Gain Elevated  

Broader source: Energy.gov (indexed) [DOE]

40: HP-UX System Administration Manager Lets Local Users Gain 40: HP-UX System Administration Manager Lets Local Users Gain Elevated Privileges U-040: HP-UX System Administration Manager Lets Local Users Gain Elevated Privileges November 17, 2011 - 8:00am Addthis PROBLEM: HP-UX System Administration Manager Lets Local Users Gain Elevated Privileges. PLATFORM: HP-UX B.11.11, B.11.23, B.11.31; running Enterprise Mobility Suite (EMS) prior to A.04.20.11.04_01 ABSTRACT: A local user can obtain elevated privileges on the target system. reference LINKS: HP Support Center Document ID: c03089106 CVE-2011-4159 SecurityTracker Alert ID: 1026331 IMPACT ASSESSMENT: Medium Discussion: A vulnerability was reported in HP-UX System Administration Manager. A local user can obtain elevated privileges on the target system. A local user can gain full control of the target system.

320

Thermal modeling and temperature control of a PEM fuel cell system for forklift applications  

E-Print Network [OSTI]

Thermal modeling and temperature control of a PEM fuel cell system for forklift applications simulation System modeling and control PEMFC a b s t r a c t Temperature changes in PEM fuel cell stacks. Stack thermal management and control are, thus, crucial issues in PEM fuel cell systems especially

Berning, Torsten

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

NO2 Management in Diesel Exhaust System | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

NO2 Management in Diesel Exhaust System NO2 Management in Diesel Exhaust System The project discusses the use of an NO2 mitigator for catalytic NO2 reduction deer09roberts.pdf...

322

Survey Report: Improving Integration of Program Management and Systems Engineering  

E-Print Network [OSTI]

For many years, a cultural barrier has existed between practitioners of systems engineering and of program management.  Some systems engineers and program managers have developed the mindset that their work activities ar ...

Conforto, Edivandro

323

Modern Data Processing for Management: a basic systems approach  

Science Journals Connector (OSTI)

......Modern Data Processing for Management: a basic systems approach J. O. Jenkins (London...Modern Data Processing for Management: a basic systems approach, by B. A. Hodson...Principles or Computer Science must approach the subject......

J. O. Jenkins

1974-11-01T23:59:59.000Z

324

ZERH Webinar: Quality Management Systems for ZERH | Department...  

Broader source: Energy.gov (indexed) [DOE]

Webinar: Quality Management Systems for ZERH ZERH Webinar: Quality Management Systems for ZERH October 16, 2014 12:00PM to 1:00PM EDT GoToWebinar The U.S. Department of Energy Zero...

325

Operations Directorate Integrated Safety and Environmental Management Systems  

E-Print Network [OSTI]

Operations Directorate Integrated Safety and Environmental Management Systems (ISEMS) Plan Directorate Integrated Safety and Environmental Management System (ISEMS) Plan The Operations Directorate, Operations Date #12;The Operations Directorate ISEMS Plan 032108 bf 2 Annual Review and Update Operations

Wechsler, Risa H.

326

OCTOBER 2013 IEEE CONTROL SYSTEMS MAGAZINE 23 PEOPLE IN CONTROL  

E-Print Network [OSTI]

papers and ten monographs in systems and control, unmanned systems, and financial market modeling served as an editor of SIAM Jour- nal on Control and Optimization, IEEE Transactions on Robotics Systems, and IEEE Transactions on Automation Science and Engineering, and on the program committees

Benmei, Chen

327

SPS access control system a new user interface  

E-Print Network [OSTI]

This document describes the project to implement at CERN new trends in industrial control systems and integrate new requirements and functions requested by users. This project will be the testing ground for the specification of procedures in the Access Control and Machine Interlock of LHC. The last modification in the Access Control System to the primary beam areas was made in 1995, and this new project is to improve the fields of personal security, access security and the introduction of modern communication networks used in the industrial control systems. Inside the cycle model of project life, it is at the present time in the test phase in terms of security and exploitation inside the Accelerator Decelerator (AD) project. The presence of Authorization Management System (AMS) to guarantee the automatic information distribution of authorizations to controlled areas is in line with this project.

Riesco, T

1999-01-01T23:59:59.000Z

328

Sandia National Laboratories: power flow control system  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

power flow control system ECIS-Princeton Power Systems, Inc.: Demand Response Inverter On March 19, 2013, in DETL, Distribution Grid Integration, Energy, Energy Surety, Facilities,...

329

Development of Building Automation and Control Systems  

E-Print Network [OSTI]

Johnson Controls, 70 in Automated Logic EIKON language, 42systems developed by Automated Logic. Similarly as shown in

Yang, Yang; Zhu, Qi; Maasoumy, Mehdi; Sangiovanni-Vincentelli, Alberto

2012-01-01T23:59:59.000Z

330

Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"  

Broader source: Energy.gov [DOE]

ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

331

Information System Security Manager (ISSM) | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

ISSM Core Competency Training Worksheet More Documents & Publications Information System Security Officer (ISSO) Cybersecurity Program Manager (CSPM) Authorizing Official (AO)...

332

Operational Control of Electricity Supply Systems  

Science Journals Connector (OSTI)

... to develop, the common-diagram control system, which enables an almost unlimited number of substations, etc., to be controlled completely from one diagram and control panel, and is ... of an undertaking. It describes a wall-type system diagram which automatically indicates, which substations have changed conditions, and therefore the area involved in any disturbance. The system diagram ...

1945-09-22T23:59:59.000Z

333

IN TELLIGENT CONTROLLING SYSTEM OF AQUICULTURE ENVIRONMENT  

E-Print Network [OSTI]

network, Decoupling control 1. INTRODUCTION Aquiculture environment is a complex system engineering which, the PLC ,engineers stations and director #12;In telligent Controlling System of aquiculture Environment 3IN TELLIGENT CONTROLLING SYSTEM OF AQUICULTURE ENVIRONMENT Deshen Zhao ,*1 1 Department of Electric

Paris-Sud XI, Université de

334

January 2007 SECURITY CONTROLS FOR  

E-Print Network [OSTI]

for their information systems. Security controls are the management, operational, and technical safeguards for their information systems. Security controls are the management, operational, and technical safeguards

335

Substation based data interpretation techniques for improved power system management  

SciTech Connect (OSTI)

There is now considerable pressure on electric utilities to operate their systems in the most efficient manner possible and to provide increased quality of service to customers. This pressure, coupled with the decreasing availability of reserve margins dictates that there is a requirement for comprehensive system operation support through, among other things, the provision of quality information relating to the behavior of the primary and secondary systems. This paper will show how the data available within modern substation control and management systems can be exploited in a cost-effective manner, through the implementation of advanced substation functions in an open systems environment. Certain functions which are presently carried out at the control center could be distributed (or partially distributed) to the substation. These functions may provide the utility staff with quality information, which can in turn be used to satisfy the objectives of increasing quality and security of supply, in addition to optimizing the utility`s information, maintenance and asset management functions.

Booth, C.; McDonald, J.R. [Univ. of Strathclyde, Glasgow (United Kingdom). Centre for Electrical Power Engineering] [Univ. of Strathclyde, Glasgow (United Kingdom). Centre for Electrical Power Engineering; Laycock, W.J.

1997-04-01T23:59:59.000Z

336

DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM  

SciTech Connect (OSTI)

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II are: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in drilling laboratories and test wells. Work during this quarter centered on the rebuilding of the prototype using the improved valve design described in the last report. Most of the components have been received and assembly has begun. Testing is expected to resume in August. In April, a paper was presented at the American Association of Drilling Engineers National Technical Conference in Houston. The paper was well received, and several oilfield service and supply companies sent inquiries regarding commercial distribution of the system. These are currently being pursued, but none have yet been finalized.

Martin E. Cobern

2005-07-27T23:59:59.000Z

337

Verification of Network Management System Configurations David L. Cohrs  

E-Print Network [OSTI]

Verification of Network Management System Configurations David L. Cohrs (608) 262-6617 dave domains too autonomous for this centralized approach. Distributing the network management system causes- ments. The NMSL system then operates in two roles: it verifies network management specifications

Miller, Barton P.

338

An Architectural Approach for Integrated Network and Systems Management  

E-Print Network [OSTI]

An Architectural Approach for Integrated Network and Systems Management Raouf Boutaba 1 and Simon introduce an architecture for the integrated management of all resources in a networked system, i that the networked system environment and its management tasks are appropriately structured. Therefore, we have

Boutaba, Raouf

339

CERTIFICATE OF APPROVAL Thisisto certifythat the Quality Management System of  

E-Print Network [OSTI]

CERTIFICATE OF APPROVAL Thisisto certifythat the Quality Management System of: Southwest Research been approved by Lloyd's Register Quality Assurance to the following Quality Management System Standards: ISO 9001 :2008 ANSIIISO/ ASQ Q9001-2008 The Quality Management System is applicable to: Research

Chapman, Clark R.

340

Wie beantrage ich das Zertifikat ,,Quality System Manager Junior"  

E-Print Network [OSTI]

Wie beantrage ich das Zertifikat ,,Quality System Manager Junior" und was kostet es Jochem DGQ Quality System Manager - Junior - Die Zusatzqualifikation für Studierende der Technischen Universität Berlin #12;Was ist der Quality Systems Manager - Junior -? Die Bedeutung des Qualitätsmanagements

Berlin,Technische Universität

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

A Spatial Planning and Analysis System for Wildland Fire Management  

E-Print Network [OSTI]

STARFIRE 11/29/2011 A Spatial Planning and Analysis System for Wildland Fire Management Welcome is an advanced and powerful spatial fire management planning and analysis system which is designed to provide visual and analytic support for fire management planning, decisions and communication. The system

342

Fuzzy logic control and optimization system  

DOE Patents [OSTI]

A control system (300) for optimizing a power plant includes a chemical loop having an input for receiving an input signal (369) and an output for outputting an output signal (367), and a hierarchical fuzzy control system (400) operably connected to the chemical loop. The hierarchical fuzzy control system (400) includes a plurality of fuzzy controllers (330). The hierarchical fuzzy control system (400) receives the output signal (367), optimizes the input signal (369) based on the received output signal (367), and outputs an optimized input signal (369) to the input of the chemical loop to control a process of the chemical loop in an optimized manner.

Lou, Xinsheng (West Hartford, CT)

2012-04-17T23:59:59.000Z

343

Design of a reference control architecture for the energy management of electric vehicles  

Science Journals Connector (OSTI)

The High-Voltage (HV) network within an Electric Vehicle (EV) will typically comprise different energy sources such as fuel cells, batteries and ultracapacitors integrated together through the use of both unidirectional and bidirectional DC-DC converters. Given the multitude of feasible HV network designs, there are obvious advantages in having a unifying control architecture that facilitates the Energy Management (EM) control task. Within this paper, a control Reference Architecture (RA) is proposed that can be employed as a template for the design of the EM control function. Example EM control systems are presented each derived from the same RA, but relating to a different physical configuration of HV network. Simulation results are presented to verify the functional performance of the control systems. In each case, the design trade-offs associated with the functional performance of the EM strategy and the non-functional requirements of modularity and reusability are discussed.

James Marco; Nicholas D. Vaughan

2012-01-01T23:59:59.000Z

344

ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Objectives & Targets Rev. 7/17/13 Objectives & Targets Rev. 7/17/13 ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS 2012 PROGRESS REPORT for SOUTHWESTERN POWER ADMINISTRATION Activity Legal Requirement Aspect Objective Target** see important note Target Achieved Details Real Estate Management DOE O 436.1 E.O. 13423 & 13514 EPAct 1992 and 2005 EISA 2007 NECPA 1978 Natural resource depletion and GHG emissions from resource intensive facilities Increase sustainability of facility resources, reduce energy and water consumption, reduce impacts to natural resources from facility usage 1) Meter 90% of electricity by September 2012 2) Meter 90% of gas, steam, and water by September 2015 3) 30% energy intensity reduction by 2015 from baseline 2003 4) Reduce water consumption intensity 2%

345

Resilient Control System Execution Agent (ReCoSEA)  

SciTech Connect (OSTI)

In an increasingly networked world, critical infrastructure systems suffer from two types of vulnerability. The first is the traditionally recognized problem of monitoring the systems for faults and failures, recognizing and analyzing data, and responding with real understanding to the problems of the system. Increasingly complex systems create the opportunity for single points of failure to cascade when inaccurate assessment of system health increases response time or leads to faulty analysis of the problems involved. A second problem involves vulnerability to cyber intrusion, in which bad actors can mask system deterioration or present false data about system status. A resilient system will protect stability, efficiency, and security. To ensure these three states, the system must react to changing conditions within the system with coordination: no one component of the system can be allowed to react to problems without real consideration of the effects of that action on other components within the system. Systems with multi-agent design typically have three layers of action, a management layer, a coordination layer, and an execution layer. A resilient multi-agent system will emphasize functions of the execution layer, which has the responsibility of initiating actions, monitoring, analyzing, and controlling its own processes, while feeding information back to the higher levels of management and coordination. The design concept of a resilient control system execution agent (ReCoSEA) grows out of these underpinnings, and through the use of computational intelligence techniques, this paper suggests an associated design methodology.

Craig G. Rieger; Kris Villez

2012-08-01T23:59:59.000Z

346

DESIGN OF HYBRID MARINE CONTROL SYSTEMS FOR DYNAMIC POSITIONING IN EXTREME SEAS  

E-Print Network [OSTI]

GENERATION & DISTRIBUTION PROCESS CONTROL STATION PROPULSION WIND SENSORS VRU GYRO BACK-UP SYSTEM SAFETY SYSTEM EMERGENCY SHUTDOWN FIRE & GAS ENERGY MANAGEMENT SYSTEM AZIPOD INFORMATION MANAGEMENT REMOTE · Harsh environmental conditions ­ Strong current: Gulf of Mexico, Northern England, Southern Norway

Nørvåg, Kjetil

347

Business Manangement System(BMS), RL-2008/Project Hanford Management...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Business Manangement System(BMS), RL-2008Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008...

348

V-125: Cisco Connected Grid Network Management System Multiple...  

Broader source: Energy.gov (indexed) [DOE]

System 2.x ABSTRACT: Some vulnerabilities have been reported in Cisco Connected Grid Network Management System. REFERENCE LINKS: Cisco Security Notice CVE-2013-1163 Cisco...

349

Belgirate, Italy, 28-30 September 2005 A COMPREHENSIVE THERMAL-AWARE POWER MANAGEMENT SYSTEM WITH  

E-Print Network [OSTI]

control mechanism more flexible. Besides battery life, thermal impact is another major reason to utilizeBelgirate, Italy, 28-30 September 2005 A COMPREHENSIVE THERMAL-AWARE POWER MANAGEMENT SYSTEM power techniques due to shortage of battery life. Conventional power management designs focused

Paris-Sud XI, Université de

350

ELECTRICAL ENGINEERING 4PL4 ENERGY SYSTEM AND MANAGEMENT FALL 2010  

E-Print Network [OSTI]

ELECTRICAL ENGINEERING 4PL4 ENERGY SYSTEM AND MANAGEMENT FALL 2010 Course Outline (dated Aug 23 OR ORAL). COURSE LOADING: · Lectures: 3 hours/week · Study time: 6 hours/week · Laboratory (4; systemwide energy flow and control; modeling and simulation; economics and management; fault prediction

Haykin, Simon

351

Evaluation of Authorization Basis Management Systems and Processes at the Pantex Plant  

Broader source: Energy.gov (indexed) [DOE]

0 0 Evaluation of Authorization Basis Management Systems and Processes at the OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS ......................................................................................... 6 Line Management Responsibility for Safety ................................ 6 Clear Roles, Responsibilities, and Authorities ........................... 10 Competence Commensurate with Responsibility ...................... 15 Balanced Priorities ........................................................................ 18 Identification and Flowdown of Requirements.......................... 22 Hazard Analysis and Controls

352

Business Manangement System(BMS), RL-2008/Project Hanford Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Manangement System(BMS), RL-2008/Project Hanford Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer More Documents & Publications iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management PIA - Security Clearance Work Tracking and Budget System Office of Personnel Management (OPM) Billing System PIA, Office of Health,

353

Control Systems Security Standards: Accomplishments And Impacts |  

Broader source: Energy.gov (indexed) [DOE]

Control Systems Security Standards: Accomplishments And Impacts Control Systems Security Standards: Accomplishments And Impacts Control Systems Security Standards: Accomplishments And Impacts This report describes the accomplishments and impacts of the standards team towards achieving these three goals and describes the follow-on efforts that need to be made toward meeting the priority strategies defined in the DOE/DHS Roadmap to Secure Control Systems in the Energy Sector. Control Systems Security Standards: Accomplishments & Impacts More Documents & Publications A Summary of Control System Security Standards Activities in the Energy Sector (October 2005) Roadmap to Secure Control Systems in the Energy Sector 2006 - Presentation to the 2008 ieRoadmap Workshop DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan

354

"Beyond HTML: Developing and re-imagining library web guides in a content management system  

E-Print Network [OSTI]

with a content management system. ” Texas Library Journal,Web content management systems: evolution, lifecycle andIN A CONTENT MANAGEMENT SYSTEM Doug Goans (dgoans@gsu.edu)

Goans, Doug; Leach, Guy; Vogel, Teri M.

2006-01-01T23:59:59.000Z

355

Faculty of Medicine Health Research Data and Systems Management (HRDSM)  

E-Print Network [OSTI]

Faculty of Medicine Health Research Data and Systems Management (HRDSM) Core Facility Governance technical manager who reports to the Associate Dean, Research. The HRDSM Core Facility is supported by a Users Management Committee that meets at least four times annually. Users Management Committee: Terms

Brownstone, Rob

356

Facilities Information Management System (FIMS) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Facilities Information Management System Facilities Information Management System (FIMS) Facilities Information Management System (FIMS) FIMS is DOE's corporate database for real property as required by DOE Order 430.1B, Real Property Asset Management. The system provides DOE with an accurate inventory and management tool that assists with planning and managing all current real property assets. The DOE Office of Acquisition and Project Management, the Office of Management and Budget, Congress, and other Federal entities use the real property data reported through FIMS. All Office of Legacy Management (LM) real property assets (buildings, trailers, other structures, and land) are entered into FIMS at the time they are acquired. Annually LM is required to update maintenance cost, operating cost, replacement cost, and utilization details for each asset.

357

Downhole Vibration Monitoring & Control System  

SciTech Connect (OSTI)

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II were: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in a drilling laboratory. Phase II concluded on January 31, 2006, and the Phase II final report was issued. Work on Phase III of the project began during the first quarter, 2006. Efforts the current quarter have continued to focus on the manufacture of the prototype and precommercial parts, field test planning and commercialization. The continued extreme lead times quoted by oilfield machine shops for collar components significantly delayed the deployment of the prototype and precommercial units. All parts have now been received for two units, and all but one for the third. Mechanical assembly of the first two systems is complete and the electronics installation and laboratory testing will be finished in April. We have entered into a Memorandum of Understanding with a major US oilfield equipment supplier, which calls for their assisting with our field tests, in cash and in kind. We are close to signing a definitive agreement which includes the purchase of the three precommercial units. We had also signed a CRADA with the Rocky Mountain Oilfield Test Center (RMOTC), and scheduled a test at their site, The RMOTC drilling schedule continues to slip, and the test cannot begin until the first week of May. Based on these factors, we have requested a no-cost extension to July 31, 2007.

Martin E. Cobern

2007-03-31T23:59:59.000Z

358

The Dark Energy Survey Data Management System  

SciTech Connect (OSTI)

The Dark Energy Survey (DES) is a project with the goal of building, installing and exploiting a new 74 CCD-camera at the Blanco telescope, in order to study the nature of cosmic acceleration. It will cover 5000 square degrees of the southern hemisphere sky and will record the positions and shapes of 300 million galaxies up to redshift 1.4. The survey will be completed using 525 nights during a 5-year period starting in 2012. About O(1 TB) of raw data will be produced every night, including science and calibration images. The DES data management system has been designed for the processing, calibration and archiving of these data. It is being developed by collaborating DES institutions, led by NCSA. In this contribution, we describe the basic functions of the system, what kind of scientific codes are involved and how the Data Challenge process works, to improve simultaneously the Data Management system algorithms and the Science Working Group analysis codes.

Sevilla, I.; /Madrid, CIEMAT; Armstrong, R.; Jarvis, M.; /Pennsylvania U.; Bertin, E.; /Paris, Inst. Astrophys.; Carlson, A.; Desai, S.; Mohr, J.; /Munich U.; Daues, G.; Gower, M.; Gruendl, R.; Petravick, D.; /Illinois U., Urbana /Illinois U., Urbana /Chicago U. /Fermilab /Brookhaven /Harvard-Smithsonian Ctr. Astrophys.

2011-09-01T23:59:59.000Z

359

Wireless Control Systems:Wireless Control Systems: Scientific Challenges andScientific Challenges and  

E-Print Network [OSTI]

Wireless Control Systems:Wireless Control Systems: Scientific Challenges andScientific Challenges and Emerging ApplicationsEmerging Applications Karl Henrik Johansson School of Electrical Engineering Royal, Greece 27-29 Jun, 2007 © Karl H. Johansson, Wireless control Acknowledgements

Johansson, Karl Henrik

360

Cyber Security Procurement Language for Control Systems Version 1.8 |  

Broader source: Energy.gov (indexed) [DOE]

Cyber Security Procurement Language for Control Systems Version 1.8 Cyber Security Procurement Language for Control Systems Version 1.8 Cyber Security Procurement Language for Control Systems Version 1.8 Supervisory Control and Data Acquisition (SCADA), Process Control System (PCS), Distributed Control System (DCS), etc. generally refer to the systems which control, monitor, and manage the nation's critical infrastructures such as electric power generators, subway systems, dams, telecommunication systems, natural gas pipelines, and many others. Simply stated, a control system gathers information and then performs a function based on established parameters or information it received. Cyber Security Procurement Language for Control Systems Version 1.8 More Documents & Publications AMI System Security Requirements - v1_01-1

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Global Fraud Management System (GFMS) AT&T Global Fraud Management System is a robust suite of data mining and management  

E-Print Network [OSTI]

AT&T technology solutions Global Fraud Management System (GFMS) AT&T Global Fraud Management System is a robust suite of data mining and management applications developed by AT&T Labs to reduce fraud offer a user-friendly interface · Centralized alert manager creates an immediate alert when fraud

Fisher, Kathleen

362

Refurbishment program of HANARO control computer system  

SciTech Connect (OSTI)

HANARO, an open-tank-in-pool type research reactor with 30 MW thermal power, achieved its first criticality in 1995. The programmable controller system MLC (Multi Loop Controller) manufactured by MOORE has been used to control and regulate HANARO since 1995. We made a plan to replace the control computer because the system supplier no longer provided technical support and thus no spare parts were available. Aged and obsolete equipment and the shortage of spare parts supply could have caused great problems. The first consideration for a replacement of the control computer dates back to 2007. The supplier did not produce the components of MLC so that this system would no longer be guaranteed. We established the upgrade and refurbishment program in 2009 so as to keep HANARO up to date in terms of safety. We designed the new control computer system that would replace MLC. The new computer system is HCCS (HANARO Control Computer System). The refurbishing activity is in progress and will finish in 2013. The goal of the refurbishment program is a functional replacement of the reactor control system in consideration of suitable interfaces, compliance with no special outage for installation and commissioning, and no change of the well-proved operation philosophy. HCCS is a DCS (Discrete Control System) using PLC manufactured by RTP. To enhance the reliability, we adapt a triple processor system, double I/O system and hot swapping function. This paper describes the refurbishment program of the HANARO control system including the design requirements of HCCS. (authors)

Kim, H. K.; Choe, Y. S.; Lee, M. W.; Doo, S. K.; Jung, H. S. [Korea Atomic Energy Research Inst., 989-111 Daedeok-daero, Yuseong, Daejeon, 305-353 (Korea, Republic of)

2012-07-01T23:59:59.000Z

363

Occupant Response to Window Control Signaling Systems  

E-Print Network [OSTI]

of sustainable design practices and create a building thatdesign team or building manager, which  described the signaling system in the context of all of the other “sustainable” 

Ackerly, Katherine

2012-01-01T23:59:59.000Z

364

A persuasive GPS-controlled thermostat system  

E-Print Network [OSTI]

Using 10 weeks of data from a couple living in an instrumented home, we report on the potential of context-aware power management for energy saving. We identify an opportunity to save on heating and cooling using a system ...

Gupta, Manu, S. M. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

365

Building Technologies Office: Building-Level Energy Management Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building-Level Energy Building-Level Energy Management Systems Research Project to someone by E-mail Share Building Technologies Office: Building-Level Energy Management Systems Research Project on Facebook Tweet about Building Technologies Office: Building-Level Energy Management Systems Research Project on Twitter Bookmark Building Technologies Office: Building-Level Energy Management Systems Research Project on Google Bookmark Building Technologies Office: Building-Level Energy Management Systems Research Project on Delicious Rank Building Technologies Office: Building-Level Energy Management Systems Research Project on Digg Find More places to share Building Technologies Office: Building-Level Energy Management Systems Research Project on AddThis.com... About Take Action to Save Energy

366

Control system and method for a hybrid electric vehicle  

DOE Patents [OSTI]

A vehicle system controller (20) is presented for a LSR parallel hybrid electric vehicle having an engine (10), a motor (12), wheels (14), a transmission (16) and a battery (18). The vehicle system controller (20) has a state machine having a plurality of predefined states (22-32) that represent operating modes for the vehicle. A set of rules is defined for controlling the transition between any two states in the state machine. The states (22-32) are prioritized according to driver demands, energy management concerns and system fault occurrences. The vehicle system controller (20) controls the transitions from a lower priority state to a higher priority state based on the set of rules. In addition, the vehicle system controller (20) will control a transition to a lower state from a higher state when the conditions no longer warrant staying in the current state. A unique set of output commands is defined for each state for the purpose of controlling lower level subsystem controllers. These commands serve to achieve the desire vehicle functionality within each state and insure smooth transitions between states.

Phillips, Anthony Mark (Northville, MI); Blankenship, John Richard (Dearborn, MI); Bailey, Kathleen Ellen (Dearborn, MI); Jankovic, Miroslava (Birmingham, MI)

2001-01-01T23:59:59.000Z

367

AUTONOMOUS CONTROL SYSTEMS: ARCHITECTURE AND FUNDAMENTAL ISSUES  

E-Print Network [OSTI]

WP7 2:00 AUTONOMOUS CONTROL SYSTEMS: ARCHITECTURE AND FUNDAMENTAL ISSUES PJ. Antsaklis, KLM PassinD Dqt ofEecuical an Cmnpua Enge Univasity ofNotr Due Notr Dame, IN14655 ABSTRACT Autonomous control Autonomous control systems must perform well under signifit uncertainties in te plant and the envionment

Antsaklis, Panos

368

DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM  

SciTech Connect (OSTI)

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II are: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in drilling laboratories and test wells. As a result of the lower than expected performance of the MR damper noted last quarter, several additional tests were conducted. These dealt with possible causes of the lack of dynamic range observed in the testing: additional damping from the oil in the Belleville springs; changes in properties of the MR fluid; and, residual magnetization of the valve components. Of these, only the last was found to be significant. By using a laboratory demagnetization apparatus between runs, a dynamic range of 10:1 was achieved for the damper, more than adequate to produce the needed improvements in drilling. Additional modeling was also performed to identify a method of increasing the magnetic field in the damper. As a result of the above, several changes were made in the design. Additional circuitry was added to demagnetize the valve as the field is lowered. The valve was located to above the Belleville springs to reduce the load placed upon it and offer a greater range of materials for its construction. In addition, to further increase the field strength, the coils were relocated from the mandrel to the outer housing. At the end of the quarter, the redesign was complete and new parts were on order. The project is approximately three months behind schedule at this time.

Martin E. Cobern

2005-04-27T23:59:59.000Z

369

New and Underutilized Technology: Computer Power Management Systems |  

Broader source: Energy.gov (indexed) [DOE]

Computer Power Management Systems Computer Power Management Systems New and Underutilized Technology: Computer Power Management Systems October 7, 2013 - 9:08am Addthis The following information outlines key deployment considerations for computer power management systems within the Federal sector. Benefits Computer power management systems include network-based software that manages computer power consumption by automatically putting them in standby, hibernation, or other low energy consuming state without interfering with user productivity or IT functions. Application Computer power management systems are applicable in most building categories with high computer counts. Key Factors for Deployment Life-cycle cost effectiveness studies are recommended prior to deployment. Ranking Criteria Federal energy savings, cost-effectiveness, and probability of success are

370

Demand Side Management by controlling refrigerators and its effects on consumers  

Science Journals Connector (OSTI)

Demand Side Management in power grids has become more and more important in recent years. Continuously growing energy demand both increases the need for distributed generation from renewable energy sources and brings out the topic of Demand Side Management. One of the major application areas of Demand Side Management in smart grids is cooling systems. In this paper, Demand Side Management with control of a refrigerator and its economic effects on consumers are analyzed. With a refrigerator model based on real measurements, several cooling schedules are simulated and annual energy fees for different pricing methods in use in Turkey are calculated and discussed. The results revealed that, 37.9% of refrigerator’s demand in peak period can be shifted to other periods and annual electricity bills for customers can be reduced by 11.4%.

M. Alparslan Zehir; Mustafa Bagriyanik

2012-01-01T23:59:59.000Z

371

An Open-Source Learning Content Management and Assessment System  

E-Print Network [OSTI]

LON-CAPA An Open-Source Learning Content Management and Assessment System Gerd Kortemeyer-CAPA is free open-source a learning content management system an assessment system around since 1992 #12 and �merson Cruz Michigan State University #12;Overview Presentation Outline: ·System Overview

372

Safe controllers design for industrial automation systems  

Science Journals Connector (OSTI)

The design of safe industrial controllers is one of the most important domains related to Automation Systems research. To support it, synthesis and analysis techniques are available. Among the analysis techniques, two of the most important are Simulation ... Keywords: Formal verification, Industrial systems behaviour modelling, Real-time systems, Safe controllers, Simulation

José Machado; Eurico Seabra; José C. Campos; Filomena Soares; Celina P. Leão

2011-05-01T23:59:59.000Z

373

Earned Value Management System RM | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Earned Value Management System RM Earned Value Management System RM Earned Value Management System RM In recent years Department of Energy (DOE) has developed a number of orders, and guidance documents aimed to improve the overall performance of project management and the acquisition of capital assets with the DOE complex. One of the most important activities or products required by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assess, to strengthen the overall performance of project management and the acquisition of capital assets is the Earned Value Management System (EVMS). EVMS allows both government and contractor managers to gain significant insights into technical, cost, and schedule progress of contracts and projects. The implementation of an EVMS is widely recognized

374

Earned Value Management System RM | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Earned Value Management System RM Earned Value Management System RM Earned Value Management System RM In recent years Department of Energy (DOE) has developed a number of orders, and guidance documents aimed to improve the overall performance of project management and the acquisition of capital assets with the DOE complex. One of the most important activities or products required by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assess, to strengthen the overall performance of project management and the acquisition of capital assets is the Earned Value Management System (EVMS). EVMS allows both government and contractor managers to gain significant insights into technical, cost, and schedule progress of contracts and projects. The implementation of an EVMS is widely recognized

375

Applications of Social Systems Modeling to Political Risk Management  

Science Journals Connector (OSTI)

Risk is inexplicably linked to complex inter-related ... and human factors would be immensely valuable to risk management. A social system model constructed with ... tools could be applied to assess and manage political

Gnana K. Bharathy; Barry Silverman

2012-01-01T23:59:59.000Z

376

Utility system integration and optimization models for nuclear power management  

E-Print Network [OSTI]

A nuclear power management model suitable for nuclear utility systems optimization has been developed for use in multi-reactor fuel management planning over periods of up to ten years. The overall utility planning model ...

Deaton, Paul Ferris

1973-01-01T23:59:59.000Z

377

Design of a Computerized Energy Management System for Marine Applications  

E-Print Network [OSTI]

A computer-based energy management system for marine applications is presented. The problem of fuel-management for large diesel engines on board ship is discussed. The design of the computer hardware and software are presented including...

Russell, B. D.; Perry, L. W.; Gerloff, G. W.; Heller, R. P.; Pankonien, G.

1982-01-01T23:59:59.000Z

378

Departmental Integrated Safety Management System (9-23-10)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This directive will convert and consolidate DOE M 450.4-1, Integrated Safety Management System Manual and DOE M 411.1-1C, Safety Management Functions, Responsibilities, and Authorities Manual into a single Order.

2010-09-23T23:59:59.000Z

379

Contract Management Using Industrial Energy Management & Reporting Systems  

E-Print Network [OSTI]

contracts in complex business relationships. This paper explores the integration of the EMRS qualification process and implementation of EMRS in large corporate structures with examples of contract management for some surprising results....

Robinson, J. E.

2011-01-01T23:59:59.000Z

380

The evolution of the ISOLDE control system  

E-Print Network [OSTI]

The ISOLDE on-line mass separator facility is operating on a Personal Computer based control system since spring 1992. Front End Computers accessing the hardware are controlled from consoles running Microsoft WindowsTM through a Novell NetWare4TM local area network. The control system is transparently integrated in the CERN wide office network and makes heavy use of the CERN standard office application programs to control and to document the running of the ISOLDE isotope separators. This paper recalls the architecture of the control system, shows its recent developments and gives some examples of its graphical user interface.

Jonsson, O C; Deloose, I; Drumm, P V; Evensen, A H M; Gase, K; Focker, G J; Fowler, A B; Kugler, E; Lettry, Jacques; Olesen, G; Ravn, H L

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Control system for fluid heated steam generator  

DOE Patents [OSTI]

A control system for controlling the location of the nucleate-boiling region in a fluid heated steam generator comprises means for measuring the temperature gradient (change in temperature per unit length) of the heating fluid along the steam generator; means for determining a control variable in accordance with a predetermined function of temperature gradients and for generating a control signal in response thereto; and means for adjusting the feedwater flow rate in accordance with the control signal.

Boland, J.F.; Koenig, J.F.

1984-05-29T23:59:59.000Z

382

Instrumentation, Control and Intelligent Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for any application that requires monitoring, control, and human interaction. External peer review and advisory committees made up of academic, R&D, and customer organizations...

383

Federal Energy Management Program: EISA Compliance Tracking System Reports  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EISA Compliance EISA Compliance Tracking System Reports and Data to someone by E-mail Share Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Facebook Tweet about Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Twitter Bookmark Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Google Bookmark Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Delicious Rank Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Digg Find More places to share Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on AddThis.com... Requirements by Subject Requirements by Regulation Notices & Rules

384

Install an Automatic Blowdown-Control System  

Broader source: Energy.gov [DOE]

This steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

385

CONTROL SYSTEM FOR SOLAR HEATING and COOLING  

E-Print Network [OSTI]

sensors and control valves used in our generalized experimental system. The experimental solarsensors are remotely located at critical (in terms of decision-making) locations in the solar

Dols, C.

2010-01-01T23:59:59.000Z

386

Nuclear Energy CFD Application Management System  

SciTech Connect (OSTI)

In modeling and simulation (M&S), it is virtually impossible to separately evaluate the effectiveness of the model from the data used because the results produced rely heavily on the interaction between the two. Both the data and the simulation are responsible for achieving the ultimate goal of providing defensible research and development (R&D) products and decisions. It is therefore vital that data verification and validation (V&V) activities, along with stringent configuration management, be considered part of the overall M&S accreditation process. In support of these goals is the Nuclear Energy CFD Application Management System (NE-CAMS) for nuclear system design and safety analysis. Working with Bettis Laboratory and Utah State University, a plan of action is being developed by the Idaho National Laboratory (INL) that will address the highest and most immediate needs to track and manage computational fluid dynamics (CFD) models and experimental data in an electronic database. The database will intrinsically incorporate the Nuclear Regulatory Commission (NRC) approved policies and procedures for quality. The quality requirements will be such that the model and data must conform to the quality specifications outlined by the NRC before they can be entered into the database. The primary focus of this database is CFD V&V for nuclear industry needs and will, in practice, serve as the best practice guideline that will accommodate NRC regulations. Such a database, along with a prescriptive methodology for how to utilize it, will provide the NRC with accepted CFD results that could potentially be used for licensing. NE-CAMS will incorporate data V&V as key precursors to the distribution of nuclear systems design and safety data, ensuring that these data are appropriate for use in a particular M&S application. Verification will be conducted to provide a level of confidence that the data selected are the most appropriate for the simulation and are properly prepared, i.e., they are complete, correct and conform to predefined procedures and requirements. Validation will ensure that the data accurately represent the real world activity that is being simulated, ensuring the analytical quality of the data. The level of detail and stringency applied against the data V&V activities will be based on a graded approach principle; the higher the risk, the more rigorous the V&V activities. For the V&V activities to be complete, it will be necessary to scrutinize the physical and statistical properties of the extracted data during the overall process. Regardless of the specific technique or methodology, data V&V will be an important component of NE-CAMS.

Hyung Lee; Kimberlyn C. Mousseau

2001-09-01T23:59:59.000Z

387

Introduction Operations Management of Blood Banking Systems Blood Banking Systems Network Design Supply Chain Network  

E-Print Network [OSTI]

Introduction Operations Management of Blood Banking Systems Blood Banking Systems Network Design Supply Chain Network Operations Management and Design of A Sustainable Blood Banking System Amir Masoumi of Massachusetts Amherst #12;Introduction Operations Management of Blood Banking Systems Blood Banking Systems

Nagurney, Anna

388

The Dark Energy Survey Data Management System  

SciTech Connect (OSTI)

The Dark Energy Survey (DES) collaboration will study cosmic acceleration with a 5000 deg2 griZY survey in the southern sky over 525 nights from 2011-2016. The DES data management (DESDM) system will be used to process and archive these data and the resulting science ready data products. The DESDM system consists of an integrated archive, a processing framework, an ensemble of astronomy codes and a data access framework. We are developing the DESDM system for operation in the high performance computing (HPC) environments at the National Center for Supercomputing Applications (NCSA) and Fermilab. Operating the DESDM system in an HPC environment offers both speed and flexibility. We will employ it for our regular nightly processing needs, and for more compute-intensive tasks such as large scale image coaddition campaigns, extraction of weak lensing shear from the full survey dataset, and massive seasonal reprocessing of the DES data. Data products will be available to the Collaboration and later to the public through a virtual-observatory compatible web portal. Our approach leverages investments in publicly available HPC systems, greatly reducing hardware and maintenance costs to the project, which must deploy and maintain only the storage, database platforms and orchestration and web portal nodes that are specific to DESDM. In Fall 2007, we tested the current DESDM system on both simulated and real survey data. We used TeraGrid to process 10 simulated DES nights (3TB of raw data), ingesting and calibrating approximately 250 million objects into the DES Archive database. We also used DESDM to process and calibrate over 50 nights of survey data acquired with the Mosaic2 camera. Comparison to truth tables in the case of the simulated data and internal crosschecks in the case of the real data indicate that astrometric and photometric data quality is excellent.

Mohr, Joseph J.; /Illinois U., Urbana, Astron. Dept. /Illinois U., Urbana; Barkhouse, Wayne; /North Dakota U.; Beldica, Cristina; /Illinois U., Urbana; Bertin, Emmanuel; /Paris, Inst. Astrophys.; Dora Cai, Y.; /NCSA, Urbana; Nicolaci da Costa, Luiz A.; /Rio de Janeiro Observ.; Darnell, J.Anthony; /Illinois U., Urbana, Astron. Dept.; Daues, Gregory E.; /NCSA, Urbana; Jarvis, Michael; /Pennsylvania U.; Gower, Michelle; /NCSA, Urbana; Lin, Huan; /Fermilab /Rio de Janeiro Observ.

2008-07-01T23:59:59.000Z

389

Effects of intentional threats to power substation control systems  

Science Journals Connector (OSTI)

Power station control and management systems represent key elements for guaranteeing the security of the power grid infrastructure. Intrinsically conceived to support the continuous provision of power in secure conditions, those systems today make intensive use of information and communication systems and are therefore exposed to related accidental and intentional cyber threats. This paper describes a simulation of cyber attacks conducted in the CESI RICERCA laboratory testbed on a prototypical substation control infrastructure with the purpose of testing their feasibility and illustrating their impact on the control system services. A set of attack scenarios targeting several subsystems has been experimented, with different simulated threat motivations and different degrees of impact on the global substation service. The paper reports some considerations about the consequences of the implemented attacks, focusing on different facets of the problem, in an effort to elucidate the full significance of the potential cyber threats.

Giovanna Dondossola; Judit Szanto; Marcelo Masera; Igor Nai Fovino

2008-01-01T23:59:59.000Z

390

Laser Inertial Fusion Energy Control Systems  

SciTech Connect (OSTI)

A Laser Inertial Fusion Energy (LIFE) facility point design is being developed at LLNL to support an Inertial Confinement Fusion (ICF) based energy concept. This will build upon the technical foundation of the National Ignition Facility (NIF), the world's largest and most energetic laser system. NIF is designed to compress fusion targets to conditions required for thermonuclear burn. The LIFE control systems will have an architecture partitioned by sub-systems and distributed among over 1000's of front-end processors, embedded controllers and supervisory servers. LIFE's automated control subsystems will require interoperation between different languages and target architectures. Much of the control system will be embedded into the subsystem with well defined interface and performance requirements to the supervisory control layer. An automation framework will be used to orchestrate and automate start-up and shut-down as well as steady state operation. The LIFE control system will be a high parallel segmented architecture. For example, the laser system consists of 384 identical laser beamlines in a 'box'. The control system will mirror this architectural replication for each beamline with straightforward high-level interface for control and status monitoring. Key technical challenges will be discussed such as the injected target tracking and laser pointing feedback. This talk discusses the the plan for controls and information systems to support LIFE.

Marshall, C; Carey, R; Demaret, R; Edwards, O; Lagin, L; Van Arsdall, P

2011-03-18T23:59:59.000Z

391

Wind Power System Simulation of Switch Control  

Science Journals Connector (OSTI)

In order to find a balance between energy efficiency and reliability of wind power generation system, this paper presents a ... switch control strategy. This paper establishes a wind power system simulation model...

Yuehua Huang; Guangxu Li; Huanhuan Li

2014-01-01T23:59:59.000Z

392

V-132: IBM Tivoli System Automation Application Manager Multiple  

Broader source: Energy.gov (indexed) [DOE]

2: IBM Tivoli System Automation Application Manager Multiple 2: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 - 6:00am Addthis PROBLEM: IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security vulnerabilities exist in the IBM Java Runtime Environment component of IBM Tivoli System Automation Application Manager which may affect the product REFERENCE LINKS: Secunia Advisory: SA53006 IBM Security Bulletin 21633991 IBM Security Bulletin 21633992 CVE-2011-3563 CVE-2012-0497 CVE-2012-0498 CVE-2012-0499 CVE-2012-0501

393

Practical Ocean Energy Management Systems Inc POEMS | Open Energy  

Open Energy Info (EERE)

Ocean Energy Management Systems Inc POEMS Ocean Energy Management Systems Inc POEMS Jump to: navigation, search Name Practical Ocean Energy Management Systems Inc (POEMS) Place San Diego, California Zip 92138 Sector Ocean, Renewable Energy Product POEMS was formed to involve the public in providing support for the development of ocean energy as a viable component of the renewable energy market. References Practical Ocean Energy Management Systems Inc (POEMS)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Practical Ocean Energy Management Systems Inc (POEMS) is a company located in San Diego, California . References ↑ "Practical Ocean Energy Management Systems Inc (POEMS)" Retrieved from

394

V-132: IBM Tivoli System Automation Application Manager Multiple  

Broader source: Energy.gov (indexed) [DOE]

2: IBM Tivoli System Automation Application Manager Multiple 2: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 - 6:00am Addthis PROBLEM: IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security vulnerabilities exist in the IBM Java Runtime Environment component of IBM Tivoli System Automation Application Manager which may affect the product REFERENCE LINKS: Secunia Advisory: SA53006 IBM Security Bulletin 21633991 IBM Security Bulletin 21633992 CVE-2011-3563 CVE-2012-0497 CVE-2012-0498 CVE-2012-0499 CVE-2012-0501

395

V-125: Cisco Connected Grid Network Management System Multiple  

Broader source: Energy.gov (indexed) [DOE]

5: Cisco Connected Grid Network Management System Multiple 5: Cisco Connected Grid Network Management System Multiple Vulnerabilities V-125: Cisco Connected Grid Network Management System Multiple Vulnerabilities April 3, 2013 - 1:44am Addthis PROBLEM: Cisco Connected Grid Network Management System Multiple Vulnerabilities PLATFORM: Cisco Connected Grid Network Management System 2.x ABSTRACT: Some vulnerabilities have been reported in Cisco Connected Grid Network Management System. REFERENCE LINKS: Cisco Security Notice CVE-2013-1163 Cisco Security Notice CVE-2013-1171 Secunia Advisory SA52834 SecurityTracker Alert ID: 1028374 SecurityTracker Alert ID: 1028373 CVE-2013-1163 CVE-2013-1171 IMPACT ASSESSMENT: Medium DISCUSSION: 1) Certain input related to the element list component is not properly sanitised before being returned to the user. This can be exploited to

396

V-125: Cisco Connected Grid Network Management System Multiple  

Broader source: Energy.gov (indexed) [DOE]

5: Cisco Connected Grid Network Management System Multiple 5: Cisco Connected Grid Network Management System Multiple Vulnerabilities V-125: Cisco Connected Grid Network Management System Multiple Vulnerabilities April 3, 2013 - 1:44am Addthis PROBLEM: Cisco Connected Grid Network Management System Multiple Vulnerabilities PLATFORM: Cisco Connected Grid Network Management System 2.x ABSTRACT: Some vulnerabilities have been reported in Cisco Connected Grid Network Management System. REFERENCE LINKS: Cisco Security Notice CVE-2013-1163 Cisco Security Notice CVE-2013-1171 Secunia Advisory SA52834 SecurityTracker Alert ID: 1028374 SecurityTracker Alert ID: 1028373 CVE-2013-1163 CVE-2013-1171 IMPACT ASSESSMENT: Medium DISCUSSION: 1) Certain input related to the element list component is not properly sanitised before being returned to the user. This can be exploited to

397

Building-Level Energy Management Systems (BLEMS) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Emerging Technologies » Building-Level Energy Management Systems Emerging Technologies » Building-Level Energy Management Systems (BLEMS) Building-Level Energy Management Systems (BLEMS) The U.S. Department of Energy (DOE) is currently conducting research into building-level energy management systems (BLEMS). Project Description BLEMS provide an integrated plug-and-play capability for legacy energy management systems (EMSs), such as those based on X-10, Zigbee, 802.15, and newly developed EMS for buildings of any size. Project Partners Research is being undertaken by DOE, the University of Southern California, General Electric (GE) Global Research, and GE Consumer & Industrial Division. Project Goals The goal of this project is to develop practical solutions that bring together ad-hoc legacy energy management systems under a single, unified

398

Optimal Shipboard Power System Management via Mixed Integer Dynamic Programming  

E-Print Network [OSTI]

Optimal Shipboard Power System Management via Mixed Integer Dynamic Programming Harry G. Kwatny' power systems using a logical specification to define the transition dynamics of the discrete subsystem following component failure(s) is a central goal of power system management including electric shipboard

Kwatny, Harry G.

399

A Database Management System for the Federal Courts  

E-Print Network [OSTI]

A Database Management System for the Federal Courts JACK R. BUCHANAN, RICHARD D. FENNELL Federal Making Information Systems, Inc., McLean, VA 22101; R. D. Fennell, Federal Judicial Center, Washington, D and several large-scale information management systems projects have been undertaken within the Federal

Samet, Hanan

400

An Open-Source Learning Content Management and Assessment System  

E-Print Network [OSTI]

LON-CAPA An Open-Source Learning Content Management and Assessment System Gerd Kortemeyer Michigan State University #12;LON-CAPA Overview · LON-CAPA is free open-source a learning content management system an assessment system around since 1992 #12;Free and Open-Source · Free: "Free beer

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Mobile Model-Based Bridge Lifecycle Management Systems  

E-Print Network [OSTI]

Mobile Model-Based Bridge Lifecycle Management Systems Amin Hammad* , Cheng Zhang, Yongxin Hu, Montreal, Quebec, Canada H3G 1T7, Canada Abstract: This paper discusses the requirements for developing Mobile Model-based Bridge Lifecycle Management Systems (MMBLMSs). These new systems should link all

Hammad, Amin

402

Performance Modeling and Access Methods for Temporal Database Management Systems  

E-Print Network [OSTI]

implementation issues. Database systems with temporal support maintain history data on line together with current. Performance Modeling and Access Methods for Temporal Database Management Systems TR86-018 August. #12;Performance Modeling and Access Methods for Temporal Database Management Systems by Ilsoo Ahn

North Carolina at Chapel Hill, University of

403

Energy Management for Motor-Driven Systems  

Broader source: Energy.gov [DOE]

This document assists in establishing an energy management plan, identifying energy savings opportunities, and designing a motor improvement plan.

404

Battery Thermal Management System Design Modeling  

SciTech Connect (OSTI)

Looks at the impact of cooling strategies with air and both direct and indirect liquid cooling for battery thermal management.

Pesaran, A.; Kim, G. H.

2006-11-01T23:59:59.000Z

405

Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2002 Annual Report.  

SciTech Connect (OSTI)

This report presents results for year twelve in a basin-wide program to harvest northern pikeminnow1 (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible. Estimates of combined annual exploitation rates resulting from the sport-reward and damangling fisheries remained at the low end of our target range of 10-20%. This suggested the need for additional effective harvest techniques. During 1991 and 1992, we developed and tested a modified (small-sized) Merwin trapnet. We found this floating trapnet to be very effective in catching northern pikeminnow at specific sites. Consequently, in 1993 we examined a system-wide fishery using floating trapnets, but found this fishery to be ineffective at harvesting large numbers of northern pikeminnow on a system-wide scale.

Porter, Russell G.; Winther, Eric C.; Fox, Lyle G.

2004-01-01T23:59:59.000Z

406

3 - How Electronic Access Control Systems Work  

Science Journals Connector (OSTI)

Publisher Summary This chapter focuses on Electronic Access Control Systems concepts and how they work. These systems comprise electronic elements, physical elements, operational elements, and logical elements to create a complete working system that facilitates rapid and reliable access to authorized users in a facility at minimum long-term cost to the organization. They are digital networks that control access to security portals. A security portal is an entry into or out of a security boundary. Most Electronic Access Control Systems also function as an intrusion alarm system. From this point forward, it assumes that the systems have an alarm system element. Electronic Access Control Systems comprise field equipment, decision modules, a communications network, one or more databases, and one or more human interface terminals. The most obvious elements of an Electronic Access Control System are the Field Elements: Access Control System Portals (for pedestrians or vehicles), alarm sensors, and any controlled devices such as roll-up doors and lights. This chapter is about Electronic Access Control Systems concepts and how they work. It is important to read this chapter very carefully and be certain that you understand everything in it. Go over the Chapter Objectives and the Chapter Summary. Everything else you read in this book is based on the material in this chapter. Electronic Access Control Systems comprise electronic elements, physical elements, operational elements, and logical elements to create a complete working system that facilitates rapid and reliable access to authorized users in a facility at minimum long-term cost to the organization. This book is written in a hierarchical fashion; that is, the concepts are related first and then expanded on in greater detail later in the book. Accordingly, you will see repetition throughout the book, but that repetition is designed to instill learning in a layered fashion. Author Information: Thomas L. Norman, CPP, PSP, CSC, Executive Vice President, Protection Partners International

Thomas Norman

2012-01-01T23:59:59.000Z

407

The Comandos Toolset for Distributed Systems Management  

Science Journals Connector (OSTI)

......Hoffner, Y. (1992) Management in Object-Based Federated...1988) Construction and management of distributed office...MEITNER AND F. REIM approach. In Proc. Int. Workshop...die Gestaltung und das Management verteilter Informationssysteme...374-378, Elsevier Science Publishers, Amsterdam......

Gerrit Kerber; Helmut Meitner; Friedemann Reim

1994-01-01T23:59:59.000Z

408

A Systems Integration Approach To Lighting Control Systems  

E-Print Network [OSTI]

and office placement with control tools to harvest natural light. Other technologies under development seek to achieve the seamless integration of lighting controls with other building systems. Here, the rewards can be rich, with increased energy savings...

Lynch, S.; Renner, R. A.

2000-01-01T23:59:59.000Z

409

Modeling Control Mechanisms with Normative Multiagent Systems  

E-Print Network [OSTI]

. This paper is about control mechanisms for virtual organizations. As a case study, we discuss the Renewables of renewable energy. We apply a conceptual model based on normative multiagent systems (NMAS). We proposeModeling Control Mechanisms with Normative Multiagent Systems: the Case of the Renewables

van der Torre, Leon

410

Boiler Combustion Control and Monitoring System  

Broader source: Energy.gov [DOE]

Efficiency of existing boilers can be improved in three ways; replacement with new boilers, replacement of the burner, or installation of a combustion control system. While installation of a new boiler or replacement of the burner can lead to the greatest efficiency gains, the higher costs associated with these measures typically leads to longer payback periods than combustion control systems.

411

Systems Engineering Management Plan for the Tank Farm Contractor  

SciTech Connect (OSTI)

This plan describes the systems engineering process to develop and manage the technical baseline. It defines the documents, interfaces, and procedures used by the Tank Farm Contractor.

O'TOOLE, S.M.

2000-04-20T23:59:59.000Z

412

Management System for Operations Mantenanace in Offshore Wind Turbine Plant.  

E-Print Network [OSTI]

?? Management system for enhancing transfer of knowledge in wind power industry has not received sufficient research attention in recent times. In some cases, the… (more)

Ghanbari, Ahmad

2012-01-01T23:59:59.000Z

413

PIA - EERE Infrastructure-EERE Reviewer Management System | Department...  

Office of Environmental Management (EM)

Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - HSPD-12 Physical and Logical Access System PIA - Bonneville Power Adminstration Ethics Helpline...

414

NTC Launches New eLearning Management System  

Broader source: Energy.gov [DOE]

The National Training Center is committed to producing high quality eLearning courses available to students for free on our Learning Management System (LMS).

415

Official Knowledge: Validation Mechanisms for Knowledge Management Systems.  

E-Print Network [OSTI]

??One of the most important roles of a knowledge management system is as a filter to verify, authenticate, or justify the knowledge of an organization.… (more)

Watkins, Jennifer H

2009-01-01T23:59:59.000Z

416

Load Shedding in Data Stream Management Systems Using Application Semantics  

Science Journals Connector (OSTI)

Data Stream Management Systems (DSMSs) process highly ... literature, including capacity planning, scheduling, and load shedding. Existing load shedding approaches drop tuples either randomly or based on the char...

Raman Adaikkalavan

2012-01-01T23:59:59.000Z

417

Local-Level Prognostics Health Management Systems Framework for...  

Office of Scientific and Technical Information (OSTI)

Health Management Systems Framework for Passive AdvSMR Components - Interim Report Re-direct Destination: Temp Data Fields Ramuhalli, Pradeep; Roy, Surajit; Hirt, Evelyn...

418

The Certification Information System: Managing Chain-of-Custody  

E-Print Network [OSTI]

-based Information Interchange #12;Transition To CIS-Based Certification Channel Management Buyer CIS Based LogisticsThe Certification Information System: Managing Chain-of-Custody Lucie K. Ozanne, Ph.D. Senior of chain-of-custody (COC) specifications. COC is a materials management and production exercise. COC

419

Integrated Weed Control for Land Stewardship at Legacy Management's Rocky Flats Site in Colorado - 13086  

SciTech Connect (OSTI)

Land stewardship is one of nine sustainability programs in the U.S. Department of Energy's Environmental Management System. Land stewardship includes maintaining and improving ecosystem health. At the Rocky Flats Site near Westminster, Colorado, land stewardship is an integral component of the Office of Legacy Management's post-closure monitoring and management at the site. Nearly 263 hectares (650 acres) were disturbed and re-vegetated during site cleanup and closure operations. Proactive management of revegetation areas is critical to the successful reestablishment of native grasslands, wetlands, and riparian communities. The undisturbed native plant communities that occur at the site also require active management to maintain the high-quality wetlands and other habitats that are home to numerous species of birds and other wildlife such as elk and deer, rare plant communities, and the federally listed threatened Preble's meadow jumping mouse. Over the past several decades, an increase of Noxious weeds has impacted much of Colorado's Front Range. As a result, weed control is a key component of the land stewardship program at Rocky Flats. Thirty-three species of state-listed Noxious weeds are known to occur in the Central and Peripheral Operable Units at Rocky Flats, along with another five species that are considered invasive at the site. Early detection and rapid response to control new invasive species is crucial to the program. An integrated weed control/vegetation management approach is key to maintaining healthy, sustainable plant communities that are able to resist Noxious weed invasions. Weed mapping, field surveys, and field-staff training sessions (to learn how to identify new potential problem species) are conducted to help detect and prevent new weed problems. The integrated approach at Rocky Flats includes administrative and cultural techniques (prevention), mechanical controls, biological controls, and chemical controls. Several species of biocontrol insects have been released to assist with control of different target weed species. Monitoring is conducted to evaluate the effectiveness of control efforts and to provide information for future control efforts. The effective implementation of this integrated approach has reduced the infestation levels of many species and has kept several newly discovered invasive species from spreading and becoming larger problems at the site. (authors)

Nelson, Jody K. [Stoller LMS Team, Contractor to the U.S. Department of Energy Office of Legacy Management, 11025 Dover Street, Suite 1000, Westminster, Colorado 80021 (United States)] [Stoller LMS Team, Contractor to the U.S. Department of Energy Office of Legacy Management, 11025 Dover Street, Suite 1000, Westminster, Colorado 80021 (United States)

2013-07-01T23:59:59.000Z

420

Modeling of Lean Exhaust Emissions Control Systems | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Lean Exhaust Emissions Control Systems Modeling of Lean Exhaust Emissions Control Systems 2002 DEER Conference Presentation: National Renewable Energy Laboratory...

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2000 Annual Report.  

SciTech Connect (OSTI)

This report presents results for year ten in a basin-wide program to harvest northern pikeminnow (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible. Estimates of combined annual exploitation rates resulting from the sport-reward and damangling fisheries remained at the low end of our target range of 10-20%. This suggested the need for additional effective harvest techniques. During 1991 and 1992, we developed and tested a modified (small-sized) Merwin trapnet. We found this floating trapnet to be very effective in catching northern pikeminnow at specific sites. Consequently, in 1993 we examined a system wide fishery using floating trapnets, but found this fishery to be ineffective at harvesting large numbers of northern pikeminnow on a system-wide scale. In 1994, we investigated the use of trapnets and gillnets at specific locations where concentrations of northern pikeminnow were known or suspected to occur during the spring season (i.e., March through early June). In addition, we initiated a concerted effort to increase public participation in the sport-reward fishery through a series of promotional and incentive activities. In 1995, 1996, and 1997, promotional activities and incentives were further improved based on the favorable response in 1994. Results of these efforts are subjects of this annual report under Section I, Implementation. Evaluation of the success of test fisheries in achieving our target goal of a 10-20% annual exploitation rate on northern pikeminnow is presented in Section II of this report. Overall program success in terms of altering the size and age composition of the northern pikeminnow population and in terms of potential reductions in loss of juvenile salmonids to northern pikeminnow predation is also discussed under Section II.

Porter, Russell G.; Glaser, Bryce G.; Amren, Jennifer

2003-03-01T23:59:59.000Z

422

U-270:Trend Micro Control Manager Input Validation Flaw in Ad Hoc Query  

Broader source: Energy.gov (indexed) [DOE]

0:Trend Micro Control Manager Input Validation Flaw in Ad Hoc 0:Trend Micro Control Manager Input Validation Flaw in Ad Hoc Query Module Lets Remote Users Inject SQL Commands U-270:Trend Micro Control Manager Input Validation Flaw in Ad Hoc Query Module Lets Remote Users Inject SQL Commands September 28, 2012 - 6:00am Addthis PROBLEM: Trend Micro Control Manager Input Validation Flaw in Ad Hoc Query Module Lets Remote Users Inject SQL Commands PLATFORM: Control Manager - 3.0, 3.5, 5.0, 5.5, 6.0 ABSTRACT: Trend Micro has been notified of a potential product vulnerability in Control Manager. reference LINKS: Trend Micro Technical Support ID 1061043 SecurityTracker Alert ID: 1027584 Secunia Advisory SA50760 CVE-2012-2998 IMPACT ASSESSMENT: Medium Discussion: A vulnerability has been reported in Trend Micro Control Manager, which can

423

Division of Information Information Systems Documentation Enterprise Systems Management Framework Version 6.0  

E-Print Network [OSTI]

Division of Information Information Systems Documentation Enterprise Systems Management Framework Version 6.0 Enterprise Systems Management Framework Version: 6.0 Date: 2 Jan 2008 Status: Endorsed Systems Management Framework Version 6.0 DOCUMENT DETAILS Document Number CIS 0002/200504466 Document

Botea, Adi

424

SP 800-37 Rev. 1. Guide for Applying the Risk Management Framework to Federal Information Systems: a Security Life Cycle Approach  

Science Journals Connector (OSTI)

The purpose of SP 800-37 Rev 1 is to provide guidelines for applying the Risk Management Framework to federal information systems to include conducting the activities of security categorization, security control selection and implementation, security ... Keywords: FISMA, Risk management framework, categorize, common controls, continuous monitoring, information systems, roles and responsibilities, security authorization, security controls

Joint Task Force Transformation Initiative

2010-02-01T23:59:59.000Z

425

A Survey of Load Control Programs for Price and System Stability  

SciTech Connect (OSTI)

Load control and demand side load management programs have been implemented in a large number of competitive power markets. These programs can provide enhanced system security and many benefits to participants. This paper reviews and compares existing economically driven programs.

Jazayeri, P.; Schellenberg, A.; Rosehart, W. D.; Doudna, J.; Widergren, Steven E.; Lawrence, D.; Mickey, J.; Jones, S.

2005-08-01T23:59:59.000Z

426

Security and stability control system for offshore platforms power grid  

Science Journals Connector (OSTI)

The key technology for offshore platform power grid interlinked-Energy Management System (EMS) is studied in this article. The perfect EMS control solutions are formulated and carried on by the studies of the control strategies of frequency control, voltage control, precedence load shedding, high frequency trip generator, communication failure, and so on according to the power flow and fault simulation calculations against all kinds of working modes of the grid. The power supply effects before and after using the power grid interlink and EMS control are contrasted. Their application has improved the power supply reliability, boosted up the ability against impacts, decreased the spare capability of generators, reduced the maintenance work, and saved the investment.

Zhang Jifen; Hu Peng; Liu Jun

2009-01-01T23:59:59.000Z

427

Federal Emergency Management Information system (FEMIS) data management guide. Version 1.2  

SciTech Connect (OSTI)

The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Chemical and Biological Defense Command. The FEMIS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain the data resources in the system. Database administrators, system administrators, and general users can use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of FEMIS. This document provides a description of the relational and spatial information present in FEMIS. It describes how the data was assembled, how it is loaded, and how it is managed while the system is in operation.

Burnett, R.A.; Downing, T.R.; Gaustad, K.L.; Johnson, S.M.; Loveall, R.M.; Winters, C.

1996-05-01T23:59:59.000Z

428

Prerequisites: Control Systems I+II, System Modeling, Engine Class (Introduction to Modeling and Control of  

E-Print Network [OSTI]

Thesis IDSC-LG-FZ-05 Gas Diesel Engine Modeling and Control The gas diesel engine is a natural gas enginePrerequisites: Control Systems I+II, System Modeling, Engine Class (Introduction to Modeling and Control of Internal Combustion Engine Systems, IC Engines, ...), Optimization Course, Matlab

Lygeros, John

429

Supervisory Power Management Control Algorithms for Hybrid Electric Vehicles: A Survey  

SciTech Connect (OSTI)

The growing necessity for environmentally benign hybrid propulsion systems has led to the development of advanced power management control algorithms to maximize fuel economy and minimize pollutant emissions. This paper surveys the control algorithms for hybrid electric vehicles (HEVs) and plug-in HEVs (PHEVs) that have been reported in the literature to date. The exposition ranges from parallel, series, and power split HEVs and PHEVs and includes a classification of the algorithms in terms of their implementation and the chronological order of their appearance. Remaining challenges and potential future research directions are also discussed.

Malikopoulos, Andreas [ORNL

2014-01-01T23:59:59.000Z

430

Electrical power distribution control methods, electrical energy demand monitoring methods, and power management devices  

DOE Patents [OSTI]

Electrical power distribution control methods, electrical energy demand monitoring methods, and power management devices are described. In one aspect, an electrical power distribution control method includes providing electrical energy from an electrical power distribution system, applying the electrical energy to a load, providing a plurality of different values for a threshold at a plurality of moments in time and corresponding to an electrical characteristic of the electrical energy, and adjusting an amount of the electrical energy applied to the load responsive to an electrical characteristic of the electrical energy triggering one of the values of the threshold at the respective moment in time.

Chassin, David P. (Pasco, WA); Donnelly, Matthew K. (Kennewick, WA); Dagle, Jeffery E. (Richland, WA)

2006-12-12T23:59:59.000Z

431

Coordinated Control of HVAC Systems  

E-Print Network [OSTI]

This paper describes the development of new control logic for starting and stopping energy-intensive equipment in buildings such as staged air-conditioning units. The concept is to use pulse-width modulation (PWM) instead of level-crossing logic. A...

Federspiel, C.; Lanning, S. D.; Li, H.; Auslander, D. M.

2001-01-01T23:59:59.000Z

432

Robust adaptive control of HVDC systems  

SciTech Connect (OSTI)

The transient performance of an HVDC power system is highly dependent on the parameters of the current/voltage regulators of the converter controls. In order to better accommodate changes in system structure or dc operating conditions, this paper introduces a new adaptive control strategy. The advantages of automatic tuning for continuous fine tuning are combined with predetermined gain scheduling in order to achieve robustness for large disturbances. Examples are provided for a digitally simulated back-to-back dc system.

Reeve, J.; Sultan, M. (Univ. of Waterloo, Ontario (Canada))

1994-07-01T23:59:59.000Z

433

National Ignition Facility Cryogenic Target Systems Interim Management Plan  

SciTech Connect (OSTI)

Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety & Health (ES&H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for delivering this system will be decided at the national level, based on experiment campaign requirement dates that will be derived through this process. The current milestone date for achieving indirect-drive ignition on the NIF is December 2010. Maintaining this milestone requires that the cryogenic systems be complete and available for fielding experiments early enough that the planned experimental campaigns leading up to ignition can be carried out. The capability of performing non-ignition cryogenic experiments is currently required by March 2006, when the NIF's first cluster of beams is operational. Plans for cryogenic and non-cryogenic experiments on the NIF are contained in NNSA's Campaign 10 Program Plans for Ignition (MTE 10.1) and High Energy Density Sciences (MTE 10.2). As described in this document, the NCTS Program Manager is responsible for managing NIF Cryogenic Target Systems development, engineering, and deployment. Through the NIF Director, the NCTS Program Manager will put in place an appropriate Program Execution Plan (draft attached) at a later time consistent with the maturing and funding these efforts. The PEP will describe management methods for carrying out these activities.

Warner, B

2002-04-25T23:59:59.000Z

434

Feedwater temperature control methods and systems  

DOE Patents [OSTI]

A system for controlling the power level of a natural circulation boiling water nuclear reactor (NCBWR) is disclosed. The system, in accordance with an example embodiment of the present invention, may include a controller configured to control a power output level of the NCBWR by controlling a heating subsystem to adjust a temperature of feedwater flowing into an annulus of the NCBWR. The heating subsystem may include a steam diversion line configured to receive steam generated by a core of the NCBWR and a steam bypass valve configured to receive commands from the controller to control a flow of the steam in the steam diversion line, wherein the steam received by the steam diversion line has not passed through a turbine. Additional embodiments of the invention may include a feedwater bypass valve for controlling an amount of flow of the feedwater through a heater bypass line to the annulus.

Moen, Stephan Craig; Noonan, Jack Patrick; Saha, Pradip

2014-04-22T23:59:59.000Z

435

You Cannot Manage What You Cannot Measure: An Information Systems Based Asset Management Perspective  

Science Journals Connector (OSTI)

Measuring the impact of implementation of information systems for asset management is a complex issue; due to the stochastic nature of process variables, substantial effects of information systems on the way u...

Abrar Haider; Andy Koronios; Gerald Quirchmayr

2006-01-01T23:59:59.000Z

436

LRRB Pavement Management SystemsTraffic Generator Managing Interaction Between Local  

E-Print Network [OSTI]

% of their energy from renewable sources by 2025. #12;LRRB Pavement Management SystemsTraffic Generator MN Wind Resource #12;LRRB Pavement Management SystemsTraffic Generator Wind Power (continued) · Advantage: · Energy Anderson, Stearns County Deb Bloom, City of Roseville Bruce Hasbargen, Lk of Woods Cty Steve Koehler, City

Minnesota, University of

437

The mathematician's control toolbox for management of type 1 diabetes  

Science Journals Connector (OSTI)

...actuating air conditioning or heating. The artificial pancreas does...used controls in chemical, oil and paper industries. Hyperglycaemic...in T1DM patients, but at the price of relatively high post-prandial...system. Originally used in the oil industry, MPC is suitable to...

2014-01-01T23:59:59.000Z

438

Systems Theory and Knowledge Management Systems: The Case of Pratt-Whitney Rocketdyne  

Science Journals Connector (OSTI)

edge management (KM) systems, many managers are still unsure how they can implement a KM system that will effectively contribute to the firm's competitive ad- vantage. A common framework is one that breaks down KM into four main activities: knowledge ...

Mark Chun; Kiho Sohn; Priscilla Arling; Nelson F. Granados

2008-01-01T23:59:59.000Z

439

Harrison Radiator Division's Energy Management, Reporting and Accounting System  

E-Print Network [OSTI]

HARRISON RADIATOR DIVISION'S ENERGY MANAGEMENT, REPORTING and ACCOUNTING SYSTEM Ronald J. Goubeaux Harrison Radiator Division Lockport, New York ABSTRACT Energy management is essential for obtaining the lowest possible product..., farm equipment, small aircraft and other types of vehicles. The energy management, reporting and accounting system that is covered in this paper is operating in Harrison's West Complex of the New York Operations located in Lockport, Western...

Goubeaux, R. J.

440

An Evolutive and Multilingual CIM Ontology Management System  

Science Journals Connector (OSTI)

CIM(Common Information Model) descrybed by IEC 61970/61968 standards is recognized as the Smart Grid ontology, while Chinese localized standards of the IEC 61970 series are published as DL/T 890 series and are widely applied to power management systems throughout China. The CIM series standards define an application program interface (API) for energy management system (EMS). One core part of the standards is IEC 61970-301, which defines the CIM base set of packages which provide a logical view of the functional aspects of an EMS. Also, there are other parts of the standards which define logical views of the parts related to EMS, such as IEC 61970-302 and IEC 61968-11. Although each part of the standards is defined as a standalone UML (Unified Modeling Language) model, a unified UML model in one UML file is maintained by IEC TC57. However, as each part of the standards and its partitive ontology model are developed by different working groups of the committee and are at different standard statuses, it is necessary to provide a continuous maintenance for the CIM ontology publicly and worldwide. Difficulties to realize the continuous CIM ontology management are caused by the present CIM model. Some typical insufficiencies of the existing CIM model are described in [1]. E.g., CIM model has a lack of version information and no version control mechanism for each entity is provided in the CIM standards so that the data integrity between ontologies of new version and old version is not guaranteed. In this paper, to achieve a continuous CIM ontology management, at first, a CIM model is transformed to the IEC 62656 model which provides a methodology to overcome the current CIM weakness. This paper will focus on the principle of transformation of CIM UML model to the IEC 62656 model. In addition the prime advantages brought about by the CIM on the IEC 62656 model such as CIM localization, customization and validation are explained. Furthermore, an evolution- mechanism integrated CIM ontology database manage- ment system via the IEC 62656 model is introduced.

Lan Wang; Akira Hosokawa; Hiroshi Murayama

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Inventory management with dynamic Bayesian network software systems  

E-Print Network [OSTI]

Inventory management with dynamic Bayesian network software systems Mark Taylor1 and Charles Fox2 1.fox@sheffield.ac.uk Abstract. Inventory management at a single or multiple levels of a supply chain is usually performed-the-shelf graphical software systems. We show how such sys- tems may be deployed to model a simple inventory problem

Barker, Jon

442

Aviation Safety + Security Program GLOBAL EXPERTS IN SAFETY MANAGEMENT SYSTEMS  

E-Print Network [OSTI]

2010- 2011 Aviation Safety + Security Program GLOBAL EXPERTS IN SAFETY MANAGEMENT SYSTEMS Relevance and currency -- that is what drives the Aviation Safety and Security Program of the USC Viterbi that our core course, Aviation Safety Management Systems, is so necessary in ensuring the safety

Wang, Hai

443

Quality management system in the CIEMAT Radiation Dosimetry Service  

Science Journals Connector (OSTI)

......spectrometry (NaI (Tl), low energy germanium and Fastscan detection...management system, an external auditor made a revision of the initial...CSN. 4 International Atomic Energy Agency. The management system...GS-R-3. 5 Internatinal Atomic Energy Agency. Application of the......

R. Martín; T. Navarro; A. M. Romero; M. A. López

2011-03-01T23:59:59.000Z

444

Sandia National Laboratories, California Environmental Management System program manual.  

SciTech Connect (OSTI)

The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

Larsen, Barbara L.

2013-04-01T23:59:59.000Z

445

Original article Characterisation of apple orchard management systems  

E-Print Network [OSTI]

Original article Characterisation of apple orchard management systems in a French Mediterranean) Abstract ­ The objective of our study was to characterise cropping systems in apple arboriculture in the less sensitive areas. apple orchard / on-farm survey / cultivation operation / management indicator

Paris-Sud XI, Université de

446

An intelligent CNC machine control system architecture  

SciTech Connect (OSTI)

Intelligent, agile manufacturing relies on automated programming of digitally controlled processes. Currently, processes such as Computer Numerically Controlled (CNC) machining are difficult to automate because of highly restrictive controllers and poor software environments. It is also difficult to utilize sensors and process models for adaptive control, or to integrate machining processes with other tasks within a factory floor setting. As part of a Laboratory Directed Research and Development (LDRD) program, a CNC machine control system architecture based on object-oriented design and graphical programming has been developed to address some of these problems and to demonstrate automated agile machining applications using platform-independent software.

Miller, D.J.; Loucks, C.S.

1996-10-01T23:59:59.000Z

447

LNG fire and vapor control system technologies  

SciTech Connect (OSTI)

This report provides a review of fire and vapor control practices used in the liquefied natural gas (LNG) industry. Specific objectives of this effort were to summarize the state-of-the-art of LNG fire and vapor control; define representative LNG facilities and their associated fire and vapor control systems; and develop an approach for a quantitative effectiveness evaluation of LNG fire and vapor control systems. In this report a brief summary of LNG physical properties is given. This is followed by a discussion of basic fire and vapor control design philosophy and detailed reviews of fire and vapor control practices. The operating characteristics and typical applications and application limitations of leak detectors, fire detectors, dikes, coatings, closed circuit television, communication systems, dry chemicals, water, high expansion foam, carbon dioxide and halogenated hydrocarbons are described. Summary descriptions of a representative LNG peakshaving facility and import terminal are included in this report together with typical fire and vapor control systems and their locations in these types of facilities. This state-of-the-art review identifies large differences in the application of fire and vapor control systems throughout the LNG industry.

Konzek, G.J.; Yasutake, K.M.; Franklin, A.L.

1982-06-01T23:59:59.000Z

448

Autonomous Thermal Control System Omid Ardakanian  

E-Print Network [OSTI]

18-24% of all energy usage. Building energy management can reduce both its operating costs and its- and middle-income countries, energy is mostly gener- ated from fossil fuel, directly contributing to global system in terms of energy efficiency. 1. Introduction Energy consumption of residential and commercial

Waterloo, University of

449

Lessons Learned from Cyber Security Assessments of SCADA and Energy Management Systems  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Enhancing control systems security in the energy sector NSTB September 2006 LESSONS LEARNED FROM CYBER SECURITY ASSESSMENTS OF SCADA AND ENERGY MANAGEMENT SYSTEMS Raymond K. Fink David F. Spencer Rita A. Wells NSTB INL/CON-06-11665 iii ABSTRACT Results from ten cyber security vulnerability assessments of process control, SCADA, and energy management systems, or components of those systems, were reviewed to identify common problem areas. The common vulnerabilities identified ranged from conventional IT security issues to specific weaknesses in control system protocols. In each vulnerability category, relative measures were assigned to the severity of the vulnerability and

450

The Bachelor of Management degree in Management Information Systems is a minimum of 40 courses in length. Admission to the Faculty may occur at the end of Year One. Students are required to have the following courses for  

E-Print Network [OSTI]

The Bachelor of Management degree in Management Information Systems is a minimum of 40 courses-language university. BachelorofManagement ManagementInformationSystems Name Technology Management 4090 - Management Policy and Strategy Management 4840 - Systems Analysis Management

Seldin, Jonathan P.

451

Intranet based system for a product innovation management process  

Science Journals Connector (OSTI)

A high quality product development process is a critical success factor for product innovations. Many companies have developed process models to support the management of product innovation processes. The defined management process models are not always flexible enough and sufficiently easy to use to ensure their regular usage in companies. This study utilises the possibilities of internet technologies to build a system to promote product innovation management (PIM), to support the use of management process models and to meet the defined development requirements for PIM. Our paper describes the developed system and clarifies its possibilities, advantages and limitations. The system includes different process models, it assists in the selection of an appropriate process model, and provides instructions for the implementation of the different stages in the PIM process. The developed system provides companies with a framework for building their own management systems.

Petteri Piippo; Jouni Koivuniemi; Hannu Karkkainen; Markku Tuominen; Takaya Ichimura

2003-01-01T23:59:59.000Z

452

An intelligent biological information management system  

Science Journals Connector (OSTI)

......Mishra 3 1Computer Science Department...and Information Science, Indiana University...for information management from data retrieval...filtering (IF) approach as a possible...and Information Science, University...1985) A New Approach to the Design...of information management, i.e. mapping......

Mathew Palakal; Snehasis Mukhopadhyay; Javed Mostafa; Rajeev Raje; Mathias N'Cho; Santosh Mishra

2002-10-01T23:59:59.000Z

453

Underground ventilation remote monitoring and control system  

SciTech Connect (OSTI)

This paper presents the design and installation of an underground ventilation remote monitoring and control system at the Waste Isolation Pilot Plant. This facility is designed to demonstrate safe underground disposal of U.S. defense generated transuranic nuclear waste. To improve the operability of the ventilation system, an underground remote monitoring and control system was designed and installed. The system consists of 15 air velocity sensors and 8 differential pressure sensors strategically located throughout the underground facility providing real-time data regarding the status of the ventilation system. In addition, a control system was installed on the main underground air regulators. The regulator control system gives indication of the regulator position and can be controlled either locally or remotely. The sensor output is displayed locally and at a central surface location through the site-wide Central Monitoring System (CMS). The CMS operator can review all sensor data and can remotely operate the main underground regulators. Furthermore, the Virtual Address Extension (VAX) network allows the ventilation engineer to retrieve real-time ventilation data on his personal computer located in his workstation. This paper describes the types of sensors selected, the installation of the instrumentation, and the initial operation of the remote monitoring system.

Strever, M.T.; Wallace, K.G. Jr.; McDaniel, K.H.

1995-12-31T23:59:59.000Z

454

Carnegie Mellon University 70-451 Management Information Systems: Spring 2012Carnegie Mellon University 70-451 Management Information Systems: Spring 2012 1Carnegie Mellon University 70-451 Management Information Systems: Spring 2012 1Carnegie Mellon Univ  

E-Print Network [OSTI]

Carnegie Mellon University 70-451 Management Information Systems: Spring 2012Carnegie Mellon University 70-451 Management Information Systems: Spring 2012 1Carnegie Mellon University 70-451 Management Information Systems: Spring 2012 1Carnegie Mellon University 70-451 Management Information Systems: Spring

Gatterbauer, Wolfgang

455

Spatial xenon oscillation control with expert systems  

SciTech Connect (OSTI)

Spatial power oscillations were attributed to the xenon transients in a reactor core in 1958 by Randall and St. John. These transients are usually initiated by a local reactivity insertion and lead to divergent axial flux oscillations in the core at constant power. Several heuristic manual control strategies and automatic control methods were developed to damp the xenon oscillations at constant power operations. However, after the load-follow operation of the reactors became a necessity of life, a need for better control strategies arose. Even though various advanced control strategies were applied to solve the xenon oscillation control problem for the load-follow operation, the complexity of the system created difficulties in modeling. The strong nonlinearity of the problem requires highly sophisticated analytical approaches that are quite inept for numerical solutions. On the other hand, the complexity of a system and heuristic nature of the solutions are the basic reasons for using artificial intelligence techniques such as expert systems.

Alten, S. (Turkish Atomic Energy Authority, Ankara (Turkey)); Danofsky, R.A. (Iowa State Univ., Ames, IA (United States))

1993-01-01T23:59:59.000Z

456

Moving mass trim control system design  

SciTech Connect (OSTI)

This paper describes the design of a moving mass trim control system for maneuvering axisymmetric reentry vehicles. The moving mass trim controller is composed of three equal masses that are independently positioned in order to deliver a desired center of mass position. For a slowly spinning reentry vehicle, the mass offset creates a trim angle-of-attack to generate modest flight path corrections. The control system must maintain the desired position of each mass in the face of large disturbances. A novel algorithm for determining the desired mass positions is developed in conjunction with a preliminary controller design. The controller design is based on classical frequency domain techniques where a bound on the disturbance magnitude is used to formulate the disturbance rejection problem. Simulation results for the controller are presented for a typical reentry vehicle.

Byrne, R.H.; Robinett, R.D.; Sturgis, B.R.

1996-03-01T23:59:59.000Z

457

Water Loss Control Using Pressure Management: Life-cycle Energy and Air Emission Effects  

Science Journals Connector (OSTI)

Pressure management is one cost-effective and efficient strategy for controlling water distribution losses. This paper evaluates the life-cycle energy use and emissions for pressure management zones in Philadelphia, Pennsylvania, and Halifax, Nova Scotia. ...

Jennifer R. Stokes; Arpad Horvath; Reinhard Sturm

2013-07-19T23:59:59.000Z

458

NCPART: management of ICEMDDN output for numerical control users  

SciTech Connect (OSTI)

NCPART is a procedure developed by the Numerical Control Department at Bendix Kansas City Division to handle the entry to and exit from ICEMDDN, and process all of the local files output by ICEMDDN. The NCPART procedure is menu driven, and provides automatic access to ICEMDDN and any files necessary to process information with ICEM for numerical Control users. Basically, the procedure handles all of the ICEMDDN operations that involve operating system commands, and frees the NC programmer to concentrate on his/her work as a programmer.

Rossini, B.F.

1986-04-01T23:59:59.000Z

459

INFORMATION ON THE SYSTEM FOR AWARD MANAGEMENT (SAM)  

Broader source: Energy.gov (indexed) [DOE]

ON THE SYSTEM FOR AWARD MANAGEMENT (SAM) ON THE SYSTEM FOR AWARD MANAGEMENT (SAM) Eight federal procurement systems and the Catalog of Federal Domestic Assistance will be combined into one new system, the System for Award Management (SAM). The overarching benefits of SAM include streamlined and integrated processes, elimination of data redundancies, and reduced costs while providing improved capability. Capability of the individual systems is expected to be available to users via SAM in stages, starting with Entity Management (Central Contractor Registration (CCR), Federal Agency Regulation (FedReg), Online Representatives and Certification Application (ORCA) and the Excluded Parties List System (EPLS)) beginning May 29, 2012. After implementation of SAM, when users go to the CCR/FedReg, ORCA, or EPLS websites, they'll be

460

Variable emissivity laser thermal control system  

DOE Patents [OSTI]

A laser thermal control system for a metal vapor laser maintains the wall mperature of the laser at a desired level by changing the effective emissivity of the water cooling jacket. This capability increases the overall efficiency of the laser.

Milner, Joseph R. (Livermore, CA)

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Artificial Immune System based urban traffic control  

E-Print Network [OSTI]

Borrowing ideas from natural immunity, Artificial Immune Systems (AIS) offer a novel approach to solving many diagnosis, optimization and control problems. In the course of this research this paradigm was applied to the problem of optimizing urban...

Negi, Pallav

2007-09-17T23:59:59.000Z

462

CONTROL SYSTEM FOR SOLAR HEATING and COOLING  

E-Print Network [OSTI]

Solar Energy Society Meeting, Los Angeles, California, Julysolar in- solation measuring stations in northern and central California (California 94720 August 1975 A control system is being developed that will be capable of operating solar

Dols, C.

2010-01-01T23:59:59.000Z

463

A Robust Model Control for Dynamic Systems  

Science Journals Connector (OSTI)

Analytical methods of polynomial algebra, heuristic techniques, and digital modeling are used to study the robustness domain of linear dynamic systems with model “input–output” controllers as a function of the mutual locations of zeros ...

S. V. Tararykin; V. V. Tyutikov

2002-05-01T23:59:59.000Z

464

DOE and Industry Showcase New Control Systems Security Technologies...  

Broader source: Energy.gov (indexed) [DOE]

Technology Development Energy Delivery Systems Cybersecurity Control Systems Security News Archive DOE and Industry Showcase New Control Systems Security Technologies at...

465

Software Quality Assurance Control of Existing Systems | Department...  

Office of Environmental Management (EM)

Software Quality Assurance Control of Existing Systems Software Quality Assurance Control of Existing Systems Existing software systems often represent significant investments and...

466

JFE Electrical and Control Systems | Open Energy Information  

Open Energy Info (EERE)

Systems Jump to: navigation, search Name: JFE Electrical and Control Systems Place: Japan Product: Electronic power, automation and control systems maker which also makes PV...

467

Management processes in U.S. air traffic management modernization : a study of global navigation satellite system development  

E-Print Network [OSTI]

This thesis investigates organization and management issues associated with the Federal Aviation Administration's (FAA) efforts to modernize the nation's Air Traffic Management (ATM) system. Focus is placed specifically ...

Sandvig, John H.

1994-01-01T23:59:59.000Z

468

NSTX Synchronization System Block Diagram Control Room  

E-Print Network [OSTI]

NSTX Synchronization System Block Diagram Clock Rack Control Room Junction Area MG FCPCRF Cage Test Cell West Patch Rack Test Cell East Patch Rack Darm Patch Rack CAMAC Crate CAMAC Crate CAMAC Crate' Level, and RF Balcony O 1,230 ft. 1.88 µsec Optic Rack 100 Control Room E 100 ft. .15µsec O 525 ft. .8

Princeton Plasma Physics Laboratory

469

Non-ferrous Metals Industry Energy Management System Certification  

Broader source: Energy.gov (indexed) [DOE]

ferrous Metals Industry ferrous Metals Industry Energy Management System Certification China Quality Certification Center Zhigang Wang 1. Importance Energy Management System 2. Pilot Programs of Energy Management System Certification Contents China Quality Certification Center A professional certification body under the General Administration of Quality Supervision, Inspection and Quarantine of the PRC. Member of the following international organizations: IECEE and IQNet. CQC provides the following services; System certification, Product certification and Training . Main Qualifications -State authorized administrator of the Energy Conservation Label -Provides compulsory product certification as outlined by the Certification and Accreditation Administration(CNCA) of the PRC

470

Adaptive excitation control in power systems  

E-Print Network [OSTI]

control input pu? and output gE? , we have puBxAx ?+?=? ? (2.25) xig ? (2.26) where ?? ? ?? ? ?== 6667 2 rJA , ?? ? ?? ?= 67 0 iB , [ ]08213.1=C 32....38) or puBxAx ?+?=? ? (2.39) xip ? (2.40) where p is a measurable output and iii C are uncertain system parameters. In the Chapter IV, we apply our adaptive control approaches to the real DAE system. We...

Chiu, Pei-Chen

2006-08-16T23:59:59.000Z

471

Extremal properties of interval control systems  

E-Print Network [OSTI]

EXTREMAL PROPERTIES OF INTERVAL CONTROL SYSTEMS A Thesis by FARIS RAGHEB KAMAL Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May 1991 Major... Subject: Electrical Engineering EXTREMAL PROPERTIES OF INTERVAL CONTROL SYSTEMS A Thesis by FARIS RAGHEB I&AMAL Approved as to style and content b1 Mohammed A. Dahleh (Chair of Committee) ostas Georghiades (Member ) Ehsani Mehrdad (Member...

Kamal, Faris Ragheb

2012-06-07T23:59:59.000Z

472

Integrated windows-based control system for an electron microscope  

SciTech Connect (OSTI)

A Windows application has been developed for management and operation of beam instruments such as electron or ion microscopes. It provides a facility that allows an operator to manage a complicated instrument with minimal effort, primarily under mouse control. The hardware control components used on similar instruments (e.g., the scanning transmission electron microscopes in our lab), such as toggles, buttons, and potentiometers for adjustments on various scales, are all replaced by the controls of the Windows application and are addressable on a single screen. The new controls in this program (via adjustable software settings) offer speed of response and smooth operation providing tailored control of various instrument parameters. Along with the controls offering single parameter adjustment, a two-dimensional control was developed that allows two parameters to be coupled and addressed simultaneously. This capability provides convenience for such tasks as finding the beam'' and directing it to a location of interest on the specimen. Using an icon-based display, this Windows application provides better integrated and more robust information for monitoring instrument status than the indicators and meters of the traditional instrument controls. As a Windows application, this program is naturally able to share the resources of the Windows system and is thus able to link to many other applications such as our image acquisition and processing programs. Computer control provides automatic protection and instant diagnostics for the experimental instrument. This Windows application is fully functional and is in daily use to control a new type of electron microscope developed in our lab.

Ruan, S. (The Enrico Fermi Institute, The University of Chicago, Chicago, Illinois 60637 (United States)); Kapp, O.H. (The Department of Radiology and The Enrico Fermi Institute, The University of Chicago, Chicago, Illinois 60637 (United States))

1994-12-01T23:59:59.000Z

473

Interactive Crop Management in the Community Earth System Model (CESM1): Seasonal Influences on Land–Atmosphere Fluxes  

Science Journals Connector (OSTI)

The Community Earth System Model, version 1 (CESM1) is evaluated with two coupled atmosphere–land simulations. The CTRL (control) simulation represents crops as unmanaged grasses, while CROP represents a crop managed simulation that includes ...

Samuel Levis; Gordon B. Bonan; Erik Kluzek; Peter E. Thornton; Andrew Jones; William J. Sacks; Christopher J. Kucharik

2012-07-01T23:59:59.000Z

474

LED lamp color control system and method  

SciTech Connect (OSTI)

An LED lamp color control system and method including an LED lamp having an LED controller 58; and a plurality of LED channels 60 operably connected to the LED controller 58, each of the plurality of LED channels 60 having a channel switch 62 in series with at least one shunted LED circuit 83, the shunted LED circuit 83 having a shunt switch 68 in parallel with an LED source 80. The LED controller 58 determines whether the LED source 80 is in a feedback controllable range, stores measured optical flux for the LED source 80 when the LED source 80 is in the feedback controllable range, and bypasses storing the measured optical flux when the LED source 80 is not in the feedback controllable range.

Gaines, James; Clauberg, Bernd; Van Erp, Josephus A.M.

2013-02-05T23:59:59.000Z

475

Integrated Safety & Environmental Management System | Stanford Synchrotron  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Integrated Safety & Environmental Management System Integrated Safety & Environmental Management System How do you plan for SAFETY in your job? In an effort to provide a formal and organized process to manage all aspects of Environment, Safety and Health (ES&H) issues at its laboratories, the DOE developed the Integrated Safety and Environmental Management System (ISEMS). In short, it's a process that allows people (such as staff and Users) at all levels to plan, perform, assess and improve their implementation of ES&H at work. The system puts the responsibility for safety on each person. Fundamental to the process are the Guiding Principles that can be viewed as "best management practices" or "how we do business", which are the policies that integrate ISMS at all levels; the Core Functions, which provide the

476

Integrated Brush Management Systems for Texas  

E-Print Network [OSTI]

of disciplines, including range management, wildlife biology, animal science and economics. Other disciplines such as recre- ation and tourism sciences also may be needed to address the potential for ecotourism or other range-related activities. In 1981, a group...

Hanselka, C. Wayne; Hamilton, Wayne T.; Rector, Barron S.

2001-01-04T23:59:59.000Z

477

Best Management Practice: Distribution System Audits, Leak Detection, and  

Broader source: Energy.gov (indexed) [DOE]

Best Management Practice: Distribution System Audits, Leak Best Management Practice: Distribution System Audits, Leak Detection, and Repair Best Management Practice: Distribution System Audits, Leak Detection, and Repair October 7, 2013 - 3:06pm Addthis A distribution system audit, leak detection, and repair programs help Federal facilities reduce water losses and make better use of limited water resources. Overview Federal facilities with large campus settings and expansive distribution systems can lose a significant amount of total water production and purchases to system leaks. Leaks in distribution systems are caused by a number of factors, including pipe corrosion, high system pressure, construction disturbances, frost damage, damaged joints, and ground shifting and settling. Regular distribution system leak detection surveys

478

Appendix 8 - iManage Change Management Standards  

Broader source: Energy.gov (indexed) [DOE]

not impact integration between iManage systems. These changes are managed by the specific project change control procedures. If there is uncertainty that a proposed change affects...

479

EFCOG Integrated Safety Management Work Planning and Control  

Broader source: Energy.gov [DOE]

Presenter: Matthew Moury, Deputy Assistant Secretary for Safety, Security and Quality Programs, Office of Environmental Management

480

Secure control systems with application to cyber-physical systems  

SciTech Connect (OSTI)

Control systems are computer-based systems with networked units consisting of sensors, actuators, control processing units, and communication devices. The role of control system is to interact, monitor, and control physical processes. Reactive power control is a fundamental issue in ensuring the security of the power network. It is claimed that Synchronous Condensers (SC) have been used at both distribution and transmission voltage levels to improve stability and to maintain voltages within desired limits under changing load conditions and contingency situations. Performance of PI controller corresponding to various tripping faults are analyzed for SC systems. Most of the eort in protecting these systems has been in protection against random failures or reliability. However, besides failures these systems are subject to various signal attacks for which new analysis are discussed here. When a breach does occur, it is necessary to react in a time commensurate with the physical dynamics of the system as it responds to the attack. Failure to act swiftly enough may result in undesirable, and possibly irreversible, physical eects. Therefore, it is meaningful to evaluate the security of a cyber-physical system, especially to protect it from cyber-attack. Illustrative numerical examples are provided together with an application to the SC systems.

Dong, Jin [ORNL] [ORNL; Djouadi, Seddik M [ORNL] [ORNL; Nutaro, James J [ORNL] [ORNL; Kuruganti, Phani Teja [ORNL] [ORNL

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management control system" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Stability analysis and controller synthesis for hybrid dynamical systems  

Science Journals Connector (OSTI)

...Yovine1995The algorithmic analysis of hybrid systemsTheoret...systemsHybrid systems:computation...controlLecture Notes in Computer Science, no...systemsHybrid systems:computation...controlLecture Notes in Computer Science, no...systemsIEEE Control Systems Mag. 28 3673...Iung2002Stability analysis and control synthesis...

2010-01-01T23:59:59.000Z

482

Using the expert systems in the operational management of production  

Science Journals Connector (OSTI)

In the conditions of computing the human society, the operational management activities can be improved by using artificial intelligence. The expert system is an intelligent system based on the symbolic representation of knowing, implemented on 2 hardware ... Keywords: artificial intelligence, expert systems, implementing the expert system, interface, search engine

Ioan Constantin Dima; Janos. Gabrara; Vladimir Modrak; Pachura Piotr; Constanta Popescu

2010-06-01T23:59:59.000Z

483

Alarm system for a nuclear control complex  

DOE Patents [OSTI]

An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

Scarola, Kenneth (Windsor, CT); Jamison, David S. (Windsor, CT); Manazir, Richard M. (North Canton, CT); Rescorl, Robert L. (Vernon, CT); Harmon, Daryl L. (Enfield, CT)

1994-01-01T23:59:59.000Z

484

Data Management Plan for The Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

Broader source: Energy.gov [DOE]

The Data Management Plan describes how DOE will handle data submitted by recipients as deliverables under the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

485

Energy Management Systems Package for Small Commercial Buildings  

Broader source: Energy.gov (indexed) [DOE]

EnMS (energy management EnMS (energy management systems) Package for Small Commercial Buildings Jessica Granderson Lawrence Berkeley National Laboratory JGranderson@lbl.gov 510.486.6792 April 4, 2013 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: Small commercial buildings present two challenges for implementing energy efficiency strategies 1) high transaction cost relative to total savings 2) lack of personnel time or skill available for energy management

486

Systems and Components Development Expertise [Nuclear Waste Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Systems and Components Systems and Components Development Expertise Nuclear Fuel Cycle and Waste Management Technologies Overview Modeling and analysis Unit Process Modeling Mass Tracking System Software Waste Form Performance Modeling Safety Analysis, Hazard and Risk Evaluations Development, Design, Operation Overview Systems and Components Development Expertise System Engineering Design Other Major Programs Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE Division on Flickr Nuclear Waste Management using Electrometallurgical Technology Systems and Components Development Expertise Bookmark and Share Electrorefiner The electrorefiner: an apparatus used for electrometallurgical treatment of spent nuclear fuel to facilitate storage and ultimate disposal. Click on

487

National SCADA Test Bed Enhancing control systems security in the energy  

Broader source: Energy.gov (indexed) [DOE]

SCADA Test Bed Enhancing control systems security in the SCADA Test Bed Enhancing control systems security in the energy sector National SCADA Test Bed Enhancing control systems security in the energy sector Improving the security of energy control systems has become a national priority. Since the mid-1990's, security experts have become increasingly concerned about the threat of malicious cyber attacks on the vital supervisory control and data acquisition (SCADA) and distributed control systems (DCS) used to monitor and manage our energy infrastructure. Many of the systems still in use today were designed to operate in closed, proprietary networks. National SCADA Test Bed Enhancing control systems security in the energy sector More Documents & Publications NSTB Summarizes Vulnerable Areas Transmission and Distribution World March 2007: DOE Focuses on Cyber

488

Energy Control Systems Engineering Inc | Open Energy Information  

Open Energy Info (EERE)

Control Systems Engineering Inc Control Systems Engineering Inc Jump to: navigation, search Name Energy Control Systems Engineering Inc Place Monrovia, California Zip 91016 Sector Services Product The company is focused on consulting, design and prototype services for system integration, management and monitoring of electrochemical energy systems such as batteries and fuel cells. Coordinates 6.30077°, -10.79716° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":6.30077,"lon":-10.79716,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

489

Performance estimates for personnel access control systems  

SciTech Connect (OSTI)

Current performance estimates for personnel access control systems use estimates of Type I and Type II verification errors. A system performance equation which addresses normal operation, the insider, and outside adversary attack is developed. Examination of this equation reveals the inadequacy of classical Type I and II error evaluations which require detailed knowledge of the adversary threat scenario for each specific installation. Consequently, new performance measures which are consistent with the performance equation and independent of the threat are developed as an aid in selecting personnel access control systems.

Bradley, R. G.

1980-10-01T23:59:59.000Z

490

Distributed computer controls for accelerator systems  

SciTech Connect (OSTI)

A distributed control system has been designed and installed at the Lawrence Livermore National Laboratory Multi-user Tandem Facility using an extremely modular approach in hardware and software. The two tiered, geographically organized design allowed total system implementation with four months with a computer and instrumentation cost of approximately $100K. Since the system structure is modular, application to a variety of facilities is possible. Such a system allows rethinking and operational style of the facilities, making possible highly reproducible and unattended operation. The impact of industry standards, i.e., UNIX, CAMAC, and IEEE-802.3, and the use of a graphics-oriented controls software suite allowed the efficient implementation of the system. The definition, design, implementation, operation and total system performance will be discussed. 3 refs.

Moore, T.L.

1988-09-01T23:59:59.000Z

491

SERVICE ORIENTED ARCHITECTURES FOR BUSINESS PROCESS MANAGEMENT SYSTEMS  

E-Print Network [OSTI]

SERVICE ORIENTED ARCHITECTURES FOR BUSINESS PROCESS MANAGEMENT SYSTEMS ABSTRACT The integration of research in the area of Service Oriented Architectures (SOA) with current methodologies and tools of on-going research in the application of Service Oriented Architectures in Business Process Management

Marchese, Maurizio

492

Leadership in Health Care Systems: Health Care Organization Management  

E-Print Network [OSTI]

Leadership in Health Care Systems: Health Care Organization Management and Leadership Track: ­ Health Care Organization, Management and Leadership ­ Clinical Research Coordinator ­ Clinical Nurse in health care ethics ­ Public mission ­ Fiscal stewardship ­ Inclusiveness and diversity ­ Theory based

Goldman, Steven A.

493

SINGULAR PERTURBATION CONTROL FOR COORDINATION OF CONVERTERS IN A FUEL CELL SYSTEM  

E-Print Network [OSTI]

- In this paper, the converters coordination problem of a fuel cell system involving a hydrogen fuel cell (FC the problem of the power management of an hydrogen Fuel Cell (FC) system associated to a reversible impulseSINGULAR PERTURBATION CONTROL FOR COORDINATION OF CONVERTERS IN A FUEL CELL SYSTEM M. Ghanes1 , M

494

FLEXIBILITY IN WATER RESOURCES MANAGEMENT: REVIEW OF CONCEPTS AND DEVELOPMENT OF ASSESSMENT MEASURES FOR FLOOD MANAGEMENT SYSTEMS1  

E-Print Network [OSTI]

FLEXIBILITY IN WATER RESOURCES MANAGEMENT: REVIEW OF CONCEPTS AND DEVELOPMENT OF ASSESSMENT around adapting water management systems to climate change often express the need to increase system it means to have a flexible water management system, what features of a system make it more flexible than

Tullos, Desiree

495

Appropriate Technologies and Systems to respond to Climate Change, Improved Water Resources Management, Waste Management and Sanitation  

E-Print Network [OSTI]

Resources Management, Waste Management and Sanitation A Review of Water Information Systems in the English to adequately manage the resource and institute measures to equitably allocate water among the various competing in the management of the resource. This paper examines the water information systems of St. Lucia, Jamaica

Barthelat, Francois

496

Proposed platform for improving grid security by trust management system  

E-Print Network [OSTI]

With increasing the applications of grid system, the risk in security field is enhancing too. Recently Trust management system has been recognized as a noticeable approach in enhancing of security in grid systems. In this article due to improve the grid security a new trust management system with two levels is proposed. The benefits of this platform are adding new domain in grid system, selecting one service provider which has closest adaption with user requests and using from domains security attribute as an important factor in computing the trust value.

Siadat, Safieh; Mohsenzadeh, Mehran

2009-01-01T23:59:59.000Z

497

Systems Engineering Introduction to Software Quality Management  

E-Print Network [OSTI]

for quality management ISO 9001:2000 is a generic model of the quality process; ISO 9001:2008 clarifies ISO 9001:2000 ISO 9001:2008 applicable to any organisation that designs, develops and maintains products (or services) ISO 9000-3 interprets 9001 for software dev. 12 Features of ISO 9001:2008 Organisational

Bryson, Joanna J.

498

Appliance-Aware Activity Recognition Mechanism for IoT Energy Management System  

Science Journals Connector (OSTI)

......implementation of smart home energy management systems based...K.-D. (2010) Home Energy Management System Based...2011) A Novel Home Energy Management System Architecture...1921, pp. 8083. ACM New York, NY, USA. [14] Tapia......

Wei-Ting Cho; Ying-Xun Lai; Chin-Feng Lai; Yueh-Min Huang

2013-08-01T23:59:59.000Z

499

Earned Value Management System (EVMS) Surveillance Standard Operating Procedure  

Broader source: Energy.gov (indexed) [DOE]

System (EVMS) System (EVMS) Surveillance Standard Operating Procedure (ESSOP) Issued by Office of Acquisition and Project Management MA-63 September 30, 2013 V2 DEPARTMENT OF ENERGY Office of Acquisition and Project Management (OAPM) EVMS SURVEILLANCE SOP (ESSOP) SEPTEMBER 30, 2013 ii Earned Value Management System (EVMS) Surveillance Standard Operating Procedure (ESSOP) OPR: MA-63 Update V2: September 30, 2013 1. PURPOSE. This EVMS Surveillance Standard Operating Procedure (ESSOP) serves as a primary reference for OAPM MA-63 when conducting EVM System-level assessments. DOE Order (O) 413.3B, the Office of Management and Budget (OMB) Circular A-11, and the Federal Acquisition Regulations (FAR) require implementation of an EVMS on DOE capital asset

500

Exergy Analysis of Data Center Thermal Management Systems  

Science Journals Connector (OSTI)

Data center thermal management systems exist to maintain the computer equipment within acceptable operating temperatures. As power densities have increased in data centers, however, the energy used by the cooling...

Amip J. Shah; Van P. Carey; Cullen E. Bash…

2012-01-01T23:59:59.000Z