Powered by Deep Web Technologies
Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Microsoft Word - AREVA Benchmarking Site Visit and Interview Final 3-21-08.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QA: N/A QA: N/A Office of Civilian Radioactive Waste Management OFFICE OF LOGISTICS MANAGEMENT BENCHMARKING PROJECT Report from AREVA, NC Site Visit and Interview, Spring 2007 March 2008 U.S. Department of Energy Office of Civilian Radioactive Waste Management Report From AREVA NC Site Visit ii March 2008 INTENTIONALLY LEFT BLANK Report From AREVA NC Site Visit iii March 2008 EXECUTIVE SUMMARY The Nuclear Waste Policy Act of 1982, as amended, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE). As part of its responsibilities to license and operate a geologic repository for disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW), OCRWM has the mission of transporting those

2

Areva Koblitz | Open Energy Information  

Open Energy Info (EERE)

Koblitz Jump to: navigation, search Name Areva Koblitz Place Sao Paulo, Sao Paulo, Brazil Zip 01419-001 Product The company operates as a generator and co-generator of energy with...

3

Poolside Measurement of AREVA BWR Fuel Channels  

Science Conference Proceedings (OSTI)

As part of the EPRI Fuel Reliability Program, a fuel channel focus group formed in 2002 to initiate measurements on irradiated boiling water reactor (BWR) fuel channels. Fuel channels designed and supplied by Framatome ANP, Inc., an AREVA and Siemens Company (AREVA), were of particular interest, since no measurement information existed from U.S. BWRs with modern AREVA channels. The efforts of the focus group culminated in development of a new channel measurement machine by AREVA and the measurement of AR...

2004-12-13T23:59:59.000Z

4

Areva_EREF_DOE-EIS-0471.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Impact Statement for the Proposed Areva Eagle Rock Enrichment Facility Bonneville County, Idaho Final Environmental Impact Statement U.S. Nuclear Regulatory Commission NUREG-1945, Adopted as DOE/EIS-0471 U.S. Department of Energy May 2011 Environmental Impact Statement for the Proposed Eagle Rock Enrichment Facility in Bonneville County, Idaho Final Report Chapters 1 through 10 Office of Federal and State Materials and Environmental Management Programs NUREG-1945, Vol. 1 AVAILABILITY OF REFERENCE MATERIALS IN NRC PUBLICATIONS NRC Reference Material As of November 1999, you may electronically access NUREG-series publications and other NRC records at NRC=s Public Electronic Reading Room at http://www.nrc.gov/reading-rm.html.

5

I'NC.£F::.-------  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I'NC.£F::.------- I'NC.£F::.------- u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETI!lUnNATION RECIPIENT:WA Dept of Commerce PROJECT TITLE: SEP ARRA· WSU Anaerobic Digester· Nutrient Recovery Technology Page 1 of3 STATE: WA funding Opportunity Announcement Number Procurement Instrument Number NEPA Cnntrol Number CID Number EEOOOO139 GF0-0000139-Q22 EE139 Based on my ",view of the informaUon concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including , but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

6

DOE's General Counsel Determines Sudan Act Does Not Bar Areva...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a loan guarantee application submitted by Areva Enrichment Services LLC to help fund a uranium enrichment facility in Idaho. The simple answer is no. The Act, as passed by...

7

NC STATE UNIVERSITY UNIVERSITY HOUSING  

E-Print Network (OSTI)

name to enter it on your application. Only current and accepted students will appear in the search box of the application process 1 #12;NC STATE UNIVERSITY SELECT THE FALL 2012 TERM 2 Once accepted by NC State, students accepting the terms and conditions associated with the Agreement. ELECTRONIC SIGNATURE #12;NC STATE

8

Washington Post Energy Conference Presented by Areva | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Post Energy Conference Presented by Areva Post Energy Conference Presented by Areva Washington Post Energy Conference Presented by Areva November 8, 2007 - 4:21pm Addthis Remarks Prepared for Secretary Bodman Washington, DC - Thank you very much for that kind introduction and for inviting me to join you here today. My thanks also to The Washington Post. You all have spent the entire day discussing our global energy situation and, in fact, many of you have devoted your careers to these issues. So, you will not be surprised to hear me say that, in my view, improving our energy security is one of the most pressing challenges of our time. I would put it this way: whether or not we have access to a secure, clean, affordable supply of energy is directly related to whether or not our economy will grow and our people will prosper, whether or not our

9

PRIVACY IMPACT ASSESSMENT: Shaw Areva MOX Services, LLC MOX  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . ,-) ')7 73?¥i5": )~"'f"YC-:;'~dt?f(~"'f9'FrrZ , . PRIVACY IMPACT ASSESSMENT: Shaw Areva MOX Services, LLC MOX Services Unclassified Information System Template - January 30, 2009, Version 2 Department of Energy Privacy Impact Assessment (pIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: hltp:llwww.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. (803) 819-22700 Dstlnson@moxprolect.com Dave Stinson, President and Chief Executive Officer, Shaw AREVA MOX Services, LLC NNSA Shaw AREVA MOX Services Savannah River Site, Aiken SC .. .. . ": .' . ' .... .- ...: ......

10

CT NC0  

Office of Legacy Management (LM)

x-L* d! x-L* d! CT NC0 - i , ,. i, .' i :.:(e.!' ,A\~, L.,t, - (iI :i' , . y- 2 .L i ._ 1 c\ :- i;! Ii $ 4. Ci:lc:i.nnati. 39, t>:::i.f> (J&l3 q-1 -3 sui3 Jrn T3 FRCM .I iirz 1 ?j ~ 1.3 bL1 T:' IP !REFOI?T TC 5YC?CZCiC~ :EWllIFl;j",tsSS L' I"JIsIc:;. .:;xli3;. iCAN !fA(=;-fL,yg-j L' sc,, E. $.iCLX:i?, -iIJ,x:q()Is. ON hL4X 24 - 25 ) 1.9tic ;i. A. Quiglel;, A.3, 3, M. ChenauEt gpxrIvB OF TP.~ The purpose of t3is trip was tc observe a proposed method for the dchy- dratim of green salt md to determine that all health and safety measures were being xrried out, SurveiU.ance of this nature provided protection against excessi3z personnel exposure, insured compliance with ICC shipping regulaticns, tion of the equ'~ and determined when adequate decontamira-

11

Areva University of Idaho JV | Open Energy Information  

Open Energy Info (EERE)

JV JV Jump to: navigation, search Name Areva-University of Idaho JV Place Moscow, Idaho Zip 83844 Product JV between AREVA and the University of Idaho to share technologies to process nuclear waste in Richland, Washington. Coordinates 55.75695°, 37.614975° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.75695,"lon":37.614975,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

12

Overview of AREVA Logistics Business Unit Capabilities and Expertise  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Outline Outline Presentation Outline Overview of AREVA Logistics Business Unit capabilities and E ti Expertise Overview of Transnuclear Inc Transportation Capabilities in the United States Questions Quick Reminder of Fuel Cycle - p.2 AREVA Logistics Business Unit - p.3 Around 4 000 transports each year Around 4,000 transports each year More than 200 transports of used fuel (France and Europe), of vitrified and compacted waste (Europe and Japan) of vitrified and compacted waste (Europe and Japan) More than 150 MOX fuel transports More than 300 transports of low level waste More than 2,700 front-end transports More than 400 transports of heavy industrial equipment Around 150 transports for research reactors and laboratories - p.4 Around 150 transports for research reactors and laboratories Design, Testing and Licensing:

13

Category:Greensboro, NC | Open Energy Information  

Open Energy Info (EERE)

NC NC Jump to: navigation, search Go Back to PV Economics By Location Media in category "Greensboro, NC" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Greensboro NC Duke Energy Carolinas LLC.png SVFullServiceRestauran... 69 KB SVQuickServiceRestaurant Greensboro NC Duke Energy Carolinas LLC.png SVQuickServiceRestaura... 68 KB SVHospital Greensboro NC Duke Energy Carolinas LLC.png SVHospital Greensboro ... 67 KB SVLargeHotel Greensboro NC Duke Energy Carolinas LLC.png SVLargeHotel Greensbor... 66 KB SVLargeOffice Greensboro NC Duke Energy Carolinas LLC.png SVLargeOffice Greensbo... 68 KB SVMediumOffice Greensboro NC Duke Energy Carolinas LLC.png SVMediumOffice Greensb... 67 KB SVMidriseApartment Greensboro NC Duke Energy Carolinas LLC.png

14

Category:Wilmington, NC | Open Energy Information  

Open Energy Info (EERE)

NC NC Jump to: navigation, search Go Back to PV Economics By Location Media in category "Wilmington, NC" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Wilmington NC Duke Energy Carolinas LLC.png SVFullServiceRestauran... 69 KB SVQuickServiceRestaurant Wilmington NC Duke Energy Carolinas LLC.png SVQuickServiceRestaura... 68 KB SVHospital Wilmington NC Duke Energy Carolinas LLC.png SVHospital Wilmington ... 67 KB SVLargeHotel Wilmington NC Duke Energy Carolinas LLC.png SVLargeHotel Wilmingto... 65 KB SVLargeOffice Wilmington NC Duke Energy Carolinas LLC.png SVLargeOffice Wilmingt... 68 KB SVMediumOffice Wilmington NC Duke Energy Carolinas LLC.png SVMediumOffice Wilming... 68 KB SVMidriseApartment Wilmington NC Duke Energy Carolinas LLC.png

15

Modified Bayer Process for Alumina Removal from Hanford Waste  

AREVA NC Inc. Modified Bayer Process for Alumina Removal from Hanford Waste January 24, 2007 Don Geniesse AREVA NC Inc.

16

DOE's General Counsel Determines Sudan Act Does Not Bar Areva Enrichment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's General Counsel Determines Sudan Act Does Not Bar Areva DOE's General Counsel Determines Sudan Act Does Not Bar Areva Enrichment Services LLC Loan Application DOE's General Counsel Determines Sudan Act Does Not Bar Areva Enrichment Services LLC Loan Application December 28, 2009 - 10:57am Addthis Washington, DC - The Office of General Counsel was recently asked whether the Sudan Accountability and Divestment Act of 2007 barred the Department from considering a loan guarantee application submitted by Areva Enrichment Services LLC to help fund a uranium enrichment facility in Idaho. The simple answer is no. The Act, as passed by Congress, applies only to government procurements. It does not apply to financial assistance programs or loan guarantee programs. The Act, as passed by Congress, also applies only to the investments of the actual offerors (or contractors) for

17

Siemens Nuclear Power GmbH AREVA Nuclear Power | Open Energy...  

Open Energy Info (EERE)

| Sign Up Search Page Edit with form History Facebook icon Twitter icon Siemens Nuclear Power GmbH AREVA Nuclear Power Jump to: navigation, search Name Siemens Nuclear Power...

18

Microsoft Word - 1DOE-ID-12-046 AREVA EC B3-6 B3-15.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 SECTION A. Project Title: Development of LWR Fuels with Enhanced Accident Tolerance - AREVA Federal Services LLC SECTION B. Project Description The AREVA team, which includes Duke Energy, the Tennessee Valley Authority, Savannah River National Laboratory, the University of Florida, and University of Wisconsin, will investigate three fuel pellet concepts and six cladding coatings and document the concept for a coolant nanoparticle additive. The team will assess the potential benefit, manufacturability, suitability, and performance of the concepts for commercially deploying enhanced accident tolerant fuel. SECTION C. Environmental Aspects / Potential Sources of Impact Radioactive Material Use - AREVA will supply the University of Florida with depleted uranium pellets. The University of Florida

19

NC Sustainable Energy Association | Open Energy Information  

Open Energy Info (EERE)

NC Sustainable Energy Association NC Sustainable Energy Association Jump to: navigation, search Name NC Sustainable Energy Association Address PO Box 6465 Place Raleigh Zip 27628 Number of employees 1-10 Year founded 1978 Phone number 919-832-7601 Website http://www.energync.org Coordinates 35.7719°, -78.6388° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.7719,"lon":-78.6388,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

20

Southern Energy Management | Open Energy Information  

Open Energy Info (EERE)

Energy Management Jump to: navigation, search Name Southern Energy Management Place Morrisville, NC Website http:www.southernenergymanag References Southern Energy Management1...

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

NC GreenPower Production Incentive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NC GreenPower Production Incentive NC GreenPower Production Incentive NC GreenPower Production Incentive < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Water Buying & Making Electricity Solar Wind Program Info State North Carolina Program Type Performance-Based Incentive Rebate Amount Varies by technology and system size PV up to 5 kW: $0.06/kWh PV larger than 5 kW: must enter bid process Wind up to 10 kW: $0.09/kWh Wind larger than 10 kW: must enter bid process Provider NC GreenPower NC GreenPower, a statewide green power program designed to encourage the use of renewable energy in North Carolina, offers production payments for grid-tied electricity generated by solar, wind, small hydro (10 megawatts

22

Does nuclear matter bind at large $N_c$?  

E-Print Network (OSTI)

The existence of nuclear matter at large $N_c$ is investigated in the framework of effective hadronic models of the Walecka type. This issue is strongly related to the nucleon-nucleon attraction in the scalar channel, and thus to the nature of the light scalar mesons. Different scenarios for the light scalar sector correspond to different large $N_c$ scaling properties of the parameters of the hadronic models. In all realistic phenomenological scenarios for the light scalar field(s) responsible for the attraction in the scalar channel it is found that nuclear matter does not bind in the large $N_c$ world. We thus conclude that $N_c = 3$ is in this respect special: 3 is fortunately not large at all and allows for nuclear matter, while large $N_c$ would not.

Bonanno, Luca

2011-01-01T23:59:59.000Z

23

Potential Applications for Nuclear Energy besides Electricity Generation: AREVA Global Perspective of HTR Potential Market  

SciTech Connect

Energy supply is increasingly showing up as a major issue for electricity supply, transportation, settlement, and process heat industrial supply including hydrogen production. Nuclear power is part of the solution. For electricity supply, as exemplified in Finland and France, the EPR brings an immediate answer; HTR could bring another solution in some specific cases. For other supply, mostly heat, the HTR brings a solution inaccessible to conventional nuclear power plants for very high or even high temperature. As fossil fuels costs increase and efforts to avoid generation of Greenhouse gases are implemented, a market for nuclear generated process heat will develop. Following active developments in the 80's, HTR have been put on the back burner up to 5 years ago. Light water reactors are widely dominating the nuclear production field today. However, interest in the HTR technology was renewed in the past few years. Several commercial projects are actively promoted, most of them aiming at electricity production. ANTARES is today AREVA's response to the cogeneration market. It distinguishes itself from other concepts with its indirect cycle design powering a combined cycle power plant. Several reasons support this design choice, one of the most important of which is the design flexibility to adapt readily to combined heat and power applications. From the start, AREVA made the choice of such flexibility with the belief that the HTR market is not so much in competition with LWR in the sole electricity market but in the specific added value market of cogeneration and process heat. In view of the volatility of the costs of fossil fuels, AREVA's choice brings to the large industrial heat applications the fuel cost predictability of nuclear fuel with the efficiency of a high temperature heat source free of greenhouse gases emissions. The ANTARES module produces 600 MWth which can be split into the required process heat, the remaining power drives an adapted prorated electric plant. Depending on the process heat temperature and power needs, up to 80 % of the nuclear heat is converted into useful power. An important feature of the design is the standardization of the heat source, as independent as possible of the process heat application. This should expedite licensing. The essential conditions for success include: 1. Timely adapted licensing process and regulations, codes and standards for such application and design; 2. An industry oriented R and D program to meet the technological challenges making the best use of the international collaboration. Gen IV could be the vector; 3. Identification of an end user (or a consortium of) willing to fund a FOAK. (authors)

Soutworth, Finis; Gauthier, Jean-Claude; Lecomte, Michel [AREVA, 3315 Old Forest Road, Lynchburg, Virginia, 24506 (United States); Carre, Franck [CEA, Saclay (France)

2007-07-01T23:59:59.000Z

24

N.C. Solar Center | Open Energy Information  

Open Energy Info (EERE)

N.C. Solar Center N.C. Solar Center Jump to: navigation, search Name N.C. Solar Center Address NCSU, Box 7401 Place Raleigh, NC Zip 27695 Number of employees 11-50 Year founded 1988 Coordinates 35.762515267°, -78.5407447815° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.762515267,"lon":-78.5407447815,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

25

Fuel Reliability Program: Post-Irradiation Examination of an AREVA Atrium 10B Corner Fuel Rod from Forsmark 3  

Science Conference Proceedings (OSTI)

The Fuel Reliability Program (FRP) is co-sponsoring numerous research projects on current generation fuel for boiling water reactors (BWRs) to determine the margins for a number of fuel performance, reliability, and regulatory issues.In this particular study, Vattenfall Nuclear Fuel (VNF) initiated a post-irradiation examination project at the Studsvik Nuclear hot cell laboratory on a BWR ATRIUM-10B corner fuel rod in position A1. The fuel rod was manufactured by AREVA and then ...

2013-07-22T23:59:59.000Z

26

Status of verification and validation of AREVA's ARCADIA{sup R} code system for PWR applications  

Science Conference Proceedings (OSTI)

In March 2010 the submittal of Topical Reports for ARCADIA{sup R} and COBRA-FLX, the thermal-hydraulic module of ARCADIA{sup R}, to the U.S. Nuclear Regulatory Commission (NRC) concluded a major step in the development of AREVA's new code system for core design and safety analyses. This submittal was dedicated to the application of the code system to uranium fuel in pressurized water reactors. The submitted information comprised results for plants operated in the US (France)) and Germany and provided uncertainties for in-core measuring systems with traveling in-core detectors and for the aero-ball system of the EPR. A reduction of the uncertainties in the prediction of F{sub AH} and F{sub Q} of > 1 % (absolute) was derived compared to the current code systems. This paper extents the verification and validation base for uranium based fuel and demonstrates the basic capabilities of ARCADIA{sup R} of describing MOX. The achieved status of verification and validation is described in detail. All applications followed the same standard without any specific calibration. The paper gives also insight in the new capability of 3D full core steady-state and transient pin-by-pin/sub-channel-by-sub-channel calculations and the opportunities offered by this feature. The gain of margins with increasing detail of the representation is outlined. Currently, the strategies for worldwide implementation of ARCADIA{sup R} are developed. (authors)

Porsch, D. [AREVA, AREVA NP GmbH (Germany); P.O.Box 1109, 91001 Erlangen (Germany); Leberig, M.; Kuch, S. [AREVA, AREVA NP GmbH (Germany); Magat, P. [AREVA, AREVA NP SAS, Paris (France); Segard, K. [AREVA, AREVA NP Inc., Lynchburg (United States)

2012-07-01T23:59:59.000Z

27

NC-1-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule Area: Virginia Power/CP&L System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to a contract between the Government and Virginia Electric and Power Company (hereinafter called the Virginia Power) and PJM Interconnection LLC (hereinafter called PJM), scheduled pursuant to a contract between the Government and Carolina Power & Light Company (hereinafter called CP&L), and billed pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale of power

28

Chemical and Biomolecular Engineering at NC State University  

E-Print Network (OSTI)

for biological research and solar energy conversion. Chemical and Biomolecular Engineering at NC State #12.Biocatalysts(enzymes) are of vital importance in the production of transportation fuels from renewable resources. Bioethanol) and cellulosic biomass can be used as sources of sugars for fermentation to ethanol. Prof. Lamb's group is also

Velev, Orlin D.

29

Precise global collision detection in multi-axis NC-machining  

Science Conference Proceedings (OSTI)

We introduce a new approach to the problem of collision detection in multi-axis NC-machining. Due to the directional nature (tool axis) of multi-axis NC-machining, space subdivision techniques are adopted from ray-tracing algorithms and are extended ... Keywords: 5-Axis machining, Collision detection and verification, Lower envelopes, NC-machining, Ray tracing, Space subdivision

Oleg Ilushin; Gershon Elber; Dan Halperin; Ron Wein; Myung-Soo Kim

2005-08-01T23:59:59.000Z

30

U.S. Energy Information Administration / 2012 Uranium Marketing Annual Report  

U.S. Energy Information Administration (EIA) Indexed Site

U.S. Energy Information Administration / 2012 Uranium Marketing Annual Report 2012 Uranium Marketing Annual Report Release Date: May 16, 2013 Next Release Date: May 2014 2010 2011 2012 American Fuel Resources, LLC Advance Uranium Asset Management Ltd. (was Uranium Asset Management) Advance Uranium Asset Management Ltd. (was Uranium Asset Management) AREVA NC, Inc. (was COGEMA, Inc.) American Fuel Resources, LLC American Fuel Resources, LLC BHP Billiton Olympic Dam Corporation Pty Ltd AREVA NC, Inc. AREVA NC, Inc. CAMECO BHP Billiton Olympic Dam Corporation Pty Ltd BHP Billiton Olympic Dam Corporation Pty Ltd ConverDyn CAMECO CAMECO Denison Mines Corp. ConverDyn ConverDyn Energy Resources of Australia Ltd. Denison Mines Corp. Energy Fuels Resources Energy USA, Inc. Effective Energy N.V.

31

Uranium Marketing Annual Report  

Gasoline and Diesel Fuel Update (EIA)

4. Uranium sellers to owners and operators of U.S. civilian nuclear power reactors, 2010-2012 2010 2011 2012 4. Uranium sellers to owners and operators of U.S. civilian nuclear power reactors, 2010-2012 2010 2011 2012 American Fuel Resources, LLC Advance Uranium Asset Management Ltd. (was Uranium Asset Management) Advance Uranium Asset Management Ltd. (was Uranium Asset Management) AREVA NC, Inc. (was COGEMA, Inc.) American Fuel Resources, LLC American Fuel Resources, LLC BHP Billiton Olympic Dam Corporation Pty Ltd AREVA NC, Inc. AREVA NC, Inc. CAMECO BHP Billiton Olympic Dam Corporation Pty Ltd BHP Billiton Olympic Dam Corporation Pty Ltd ConverDyn CAMECO CAMECO Denison Mines Corp. ConverDyn ConverDyn Energy Resources of Australia Ltd. Denison Mines Corp. Energy Fuels Resources Energy USA, Inc. Effective Energy N.V. Energy Resources of Australia Ltd.

32

"2012 Uranium Marketing Annual Report"  

U.S. Energy Information Administration (EIA) Indexed Site

4. Uranium sellers to owners and operators of U.S. civilian nuclear power reactors, 2010-2012" 4. Uranium sellers to owners and operators of U.S. civilian nuclear power reactors, 2010-2012" 2010,2011,2012 "American Fuel Resources, LLC","Advance Uranium Asset Management Ltd. (was Uranium Asset Management)","Advance Uranium Asset Management Ltd. (was Uranium Asset Management)" "AREVA NC, Inc. (was COGEMA, Inc.)","American Fuel Resources, LLC","American Fuel Resources, LLC" "BHP Billiton Olympic Dam Corporation Pty Ltd","AREVA NC, Inc.","AREVA NC, Inc." "CAMECO","BHP Billiton Olympic Dam Corporation Pty Ltd","BHP Billiton Olympic Dam Corporation Pty Ltd" "ConverDyn","CAMECO","CAMECO" "Denison Mines Corp.","ConverDyn","ConverDyn"

33

Outage management and health physics issue, 2009  

SciTech Connect

The focus of the May-June issue is on outage management and health physics. Major articles include the following: Planning and scheduling to minimize refueling outage, by Pat McKenna, AmerenUE; Prioritizing safety, quality and schedule, by Tom Sharkey, Dominion; Benchmarking to high standards, by Margie Jepson, Energy Nuclear; Benchmarking against U.S. standards, by Magnox North, United Kingdom; Enabling suppliers for new build activity, by Marcus Harrington, GE Hitachi Nuclear Energy; Identifying, cultivating and qualifying suppliers, by Thomas E. Silva, AREVA NP; Creating new U.S. jobs, by Francois Martineau, Areva NP. Industry innovation articles include: MSL Acoustic source load reduction, by Amir Shahkarami, Exelon Nuclear; Dual Methodology NDE of CRDM nozzles, by Michael Stark, Dominion Nuclear; and Electronic circuit board testing, by James Amundsen, FirstEnergy Nuclear Operating Company. The plant profile article is titled The future is now, by Julia Milstead, Progress Energy Service Company, LLC.

Agnihotri, Newal (ed.)

2009-05-15T23:59:59.000Z

34

NC State Chemical Engineering Degrees -B and BS Graduation Name NicknamDgr Maj Grad Date H Hometown StateInitial Employer Employer City StateJob Title  

E-Print Network (OSTI)

-Employed Diggs NC Farmer Oliver Max Gardner OMax BS IC 5/27/1903 Shelby NC NC College of A&M Ar Raleigh NC Winborne White BS IC 5/27/1903 Greenville NC Raleigh Hosiery Mill Raleigh NC Dyer Edgar William Gaither BS/30/1906 Halifax NC U. Illinois Urbana IL Assistant William Graham Knox BS IC 5/30/1906 Charlotte NC Northampton

Velev, Orlin D.

35

Properties of the SU(Nc) Gluon Plasma  

E-Print Network (OSTI)

We investigate the deconfinement transition in SU(Nc) gauge theories, and properties of the deconfined phase. A detailed lattice study of SU(4) and SU(6) gauge theories are conducted, and finite volume and cutoff effects on thermodynamic observables are studied. The scaling of the deconfinement transition point with lattice spacing is used to calculate the scale, Lambda_MSbar. The continuum estimates of the thermodynamic quantities are used to study properties of the gluon plasma. In particular, the approach to conformal limit is studied. We do not find any evidence of a strongly coupled, conformal phase in these theories.

Saumen Datta; Sourendu Gupta

2009-10-15T23:59:59.000Z

36

ANVIL-5000 1. 1. 1 NC programming update  

SciTech Connect

ANVIL-5000 is used effectively by the staff in Sandia's Materials Process Engineering and Fabrication Directorate to develop training materials, solve mathematics problems, prepare documentation, and program machines. The computational graphics resources are reviewed, the techniques for training the craftworker staff to use ANVIL are described, and a variety of current ANVIL applications are documented. Complex ANVIL projects involving a propeller blade mold and a water cooled head are described to illustrate the utility of CAD/CAM techniques being used by the NC Engineering staff. 30 figs.

Plomp, P.W.

1987-01-01T23:59:59.000Z

37

"2012 Uranium Marketing Annual Report"  

U.S. Energy Information Administration (EIA) Indexed Site

5. Enrichment service sellers to owners and operators of U.S. civilian nuclear power reactors, 2010-2012" 5. Enrichment service sellers to owners and operators of U.S. civilian nuclear power reactors, 2010-2012" 2010,2011,2012 "AREVA NC, Inc. (was COGEMA, Inc.)","Advance Uranium Asset Management Ltd.","Advance Uranium Asset Management Ltd." "LES, LLC (Louisiana Energy Services)","AREVA NC, Inc.","AREVA NC, Inc." "NUKEM, Inc.","CNEIC (China Nuclear Energy Industry Corporation)","CNEIC (China Nuclear Energy Industry Corporation)" "UG U.S.A., Inc.","Energy Northwest","LES, LLC (Louisiana Energy Services)" "URENCO, Inc.","LES, LLC (Louisiana Energy Services)","NextEra Energy Seabrook" "USEC, Inc. (United States Enrichment Corporation)","NUKEM, Inc.","NUKEM, Inc."

38

Uranium Marketing Annual Report - Release Date: May 31, 2011  

Gasoline and Diesel Fuel Update (EIA)

5. Enrichment service sellers to owners and operators of U.S. civilian nuclear power reactors, 2010-2012 5. Enrichment service sellers to owners and operators of U.S. civilian nuclear power reactors, 2010-2012 2010 2011 2012 AREVA NC, Inc. (was COGEMA, Inc.) Advance Uranium Asset Management Ltd. Advance Uranium Asset Management Ltd. LES (Louisiana Energy Services) AREVA NC, Inc. AREVA NC, Inc. NUKEM, Inc. CNEIC (China Nuclear Energy Industry Corporation) CNEIC (China Nuclear Energy Industry Corporation) UG U.S.A., Inc. Energy Northwest LES, LLC (Louisiana Energy Services) URENCO, Inc. LES, LLC (Louisiana Energy Services) NextEra Energy Seabrook USEC, Inc. (United States Enrichment Corporation) NUKEM, Inc. NUKEM, Inc. Westinghouse Electric Company TENEX (Techsnabexport Joint Stock Company) TENEX (Techsnabexport Joint Stock Company) URENCO, Inc. UG U.S.A., Inc.

39

U.S. Energy Information Administration / 2012 Uranium Marketing Annual Report  

U.S. Energy Information Administration (EIA) Indexed Site

1 1 2012 Uranium Marketing Annual Report Release Date: May 16, 2013 Next Release Date: May 2014 2010 2011 2012 AREVA NC, Inc. (was COGEMA, Inc.) Advance Uranium Asset Management Ltd. Advance Uranium Asset Management Ltd. LES, LLC (Louisiana Energy Services) AREVA NC, Inc. AREVA NC, Inc. NUKEM, Inc. CNEIC (China Nuclear Energy Industry Corporation) CNEIC (China Nuclear Energy Industry Corporation) UG U.S.A., Inc. Energy Northwest LES, LLC (Louisiana Energy Services) URENCO, Inc. LES, LLC (Louisiana Energy Services) NextEra Energy Seabrook USEC, Inc. (United States Enrichment Corporation) NUKEM, Inc. NUKEM, Inc. Westinghouse Electric Company TENEX (Techsnabexport Joint Stock Company) TENEX (Techsnabexport Joint Stock Company) URENCO, Inc. UG U.S.A., Inc. USEC, Inc. (United States Enrichment Corporation)

40

(1) Shaw AREVA MOX Services Revised Updated Reply to Notice of Violation 70-  

E-Print Network (OSTI)

Materials" This letter corrects an error in our letter of September 1,2011. In that letter, we stated in Item 5 on Page 6 of the Enclosure, that document DCSOI-ZMJ-DS-NTE-N-65973 had been revised. The revision was not approved until September 6, 2011. The Enclosure has been revised accordingly. If you have any questions, please contact Jim O'Dell, Regulatory Compliance Manager, at (803) 819-2234. Sincerely,

Kelly Trice; Eric Chassard; Mox Services; Sam Glenn Nnsa/srs; William Gloersen Nrc/rii; Mark Gober; Mox Services; Dealis Gwyn; Mox Services; Melvin Shannon Nrc/srs

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Quark-Hadron Duality for Hybrid Mesons at Large-Nc  

E-Print Network (OSTI)

We investigate implications of quark-hadron duality for hybrid mesons in the large-Nc limit. A simple formalism is developed which implements duality for QCD two-point functions of currents of quark bilinears, with any number of gluons. We argue that the large-Nc meson masses share a common parameter, which is related to the QCD string tension. This parameter is fixed from correlators of conserved vector and axial-vector currents, and using lattice QCD determinations of the string tension. Our results predict towers of hybrid mesons which, within expected 1/Nc corrections, naturally accommodate the 1^(-+) experimental hybrid candidates.

S. R. Beane

2001-08-02T23:59:59.000Z

42

Outage managment and health physics issue, 2008  

SciTech Connect

The focus of the May-June issue is on outage management and health physics. Major articles include: Outage optimization initiatives, by George B. Beam, AREVA NP, Inc.; New plant based on excellent track records, by Jim Scarola, Progress Energy; Meeting customer needs and providing environmental benefits, by Peter S. Hastings, Duke Energy; Plants with 3-D design, by Jack A. Bailey, Tennessee Valley Authority; and Highest quality with exceptional planning, by Jason A. Walls, Duke Energy. Industry innovation articles include: Integrated exposure reduction plan, by Ed Wolfe, Exelon; Performance-based radiation worker training, by Joe Giuffre and Timothy Vriezerma, American Electric Power.

Agnihotri, Newal (ed.)

2008-05-15T23:59:59.000Z

43

Toxicity of aqueous fullerene nC60 to activated sludge: nitrification inhibition and microtox test  

Science Conference Proceedings (OSTI)

The increasing production and use of fullerene nanomaterials raised their exposure potential to the activated sludge during biological wastewater treatment process. In this study, the toxicity of aqueous nanoscaled C60 (nC60) to ...

Yongkui Yang; Norihide Nakada; Ryoji Nakajima; Chao Wang; Hiroaki Tanaka

2012-01-01T23:59:59.000Z

44

pi N to Multi-pi N Scattering in the 1/N_c Expansion  

E-Print Network (OSTI)

We extend the 1/N_c meson-baryon scattering formalism to pi N to multi-pi N case. We first show that the leading-order large N_c processes proceed through resonant intermediate states (e.g., rho N or pi Delta). We find that the pole structure of baryon resonances can be uniquely identified by their (non)appearance in eta N or mixed partial-wave pi Delta final states.

Herry J. Kwee

2007-06-29T23:59:59.000Z

45

Pion Electroproduction Amplitude Relations in the 1/N_c Expansion  

E-Print Network (OSTI)

We derive expressions for pion electroproduction amplitudes in the 1/N_c expansion of QCD, and obtain from them linear relations between the electromagnetic multipole amplitudes that hold at all energies. The leading-order relations in 1/N_c compare favorably with available data (especially away from resonances), but the next-to-leading-order relations tend to provide only small or no improvement.

Lebed, Richard F

2009-01-01T23:59:59.000Z

46

HEAVY BARYONS: A COMBINED LARGE Nc AND HEAVY QUARK EXPANSION FOR ELECTROWEAK CURRENTS  

E-Print Network (OSTI)

The combined large Nc and heavy quark limit for baryons containing a single heavy quark is discussed. The combined large Nc and heavy quark expansion of the heavy quark bilinear operators is obtained. In the combined expansion the corrections proportional to mN/mQ are summed to all orders. In particular, the combined expansion can be used to determine semileptonic form factors of heavy baryons in the combined limit. 1

Boris A. Gelman

2002-01-01T23:59:59.000Z

47

Large $N_c$ QCD at non-zero chemical potential  

E-Print Network (OSTI)

The general issue of large $N_c$ QCD at nonzero chemical potential is considered with a focus on understanding the difference between large $N_c$ QCD with an isospin chemical potential and large $N_c$ QCD with a baryon chemical potential. A simple diagrammatic analysis analogous to `t Hooft's analysis at $\\mu=0$ implies that the free energy with a given baryon chemical potential is equal to the free energy with an isospin chemical potential of the same value plus $1/N_c$ corrections. Phenomenologically, these two systems behave quite differently. A scenario to explain this difference in light of the diagrammatic analysis is explored. This scenario is based on a phase transition associated with pion condensation when the isospin chemical potential exceeds $m_\\pi/2$; associated with this transition there is breakdown of the $1/N_c$ expansion--in the pion condensed phase there is a distinct $1/N_c$ expansion including a larger set of diagrams. While this scenario is natural, there are a number of theoretical issues which at least superficially challenge it. Most of these can be accommodated. However, the behavior of quenched QCD which raises a number of apparently analogous issues cannot be easily understood completely in terms of an analogous scenario. Thus, the overall issue remains open.

Thomas D. Cohen

2004-10-11T23:59:59.000Z

48

Microsoft Word - Web Posting for Earned Value Management 2013-11-05.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONTRACTOR EARNED VALUE MANAGEMENT SYSTEM CERTIFICATION STATUS CONTRACTOR EARNED VALUE MANAGEMENT SYSTEM CERTIFICATION STATUS (Revised November 5, 2013) DOE Office (Geographic Site) Contract Name Contractor Name Principal Companies Certified Green = Yes Red = No Savannah River (Aiken, SC) Salt Waste Processing Facility Parsons Infrastructure & Technology Group Parsons Infrastructure & Technology Group, Inc. Management & Operations Contract (Note 1) Savannah River Nuclear Solutions, LLC Fluor Corporation Honeywell International, Inc. Northrop Grumman Corporation Liquid Waste Savannah River Remediation, LLC URS - Washington Division B&W Technical Services Group, Inc CH2M-Hill Constructors, Inc. AREVA Federal Services, LLC

49

Microsoft Word - Web Posting for Earned Value Management 2013-11-05.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONTRACTOR EARNED VALUE MANAGEMENT SYSTEM CERTIFICATION STATUS CONTRACTOR EARNED VALUE MANAGEMENT SYSTEM CERTIFICATION STATUS (Revised November 5, 2013) DOE Office (Geographic Site) Contract Name Contractor Name Principal Companies Certified Green = Yes Red = No Savannah River (Aiken, SC) Salt Waste Processing Facility Parsons Infrastructure & Technology Group Parsons Infrastructure & Technology Group, Inc. Management & Operations Contract (Note 1) Savannah River Nuclear Solutions, LLC Fluor Corporation Honeywell International, Inc. Northrop Grumman Corporation Liquid Waste Savannah River Remediation, LLC URS - Washington Division B&W Technical Services Group, Inc CH2M-Hill Constructors, Inc. AREVA Federal Services, LLC

50

N.C. Agency Growing, Helping Citizens Save Money | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

N.C. Agency Growing, Helping Citizens Save Money N.C. Agency Growing, Helping Citizens Save Money N.C. Agency Growing, Helping Citizens Save Money March 12, 2010 - 5:20pm Addthis Reginald Speight, CEO of Martin County Community Action | Photo courtesy of Martin County Community Action Reginald Speight, CEO of Martin County Community Action | Photo courtesy of Martin County Community Action Joshua DeLung North Carolina will receive $132 million, or 10 times more money than in years past, for its weatherization program through the Recovery Act. Martin County Community Action is tasked with weatherizing about 1,029 units with its $7.7 million share. The agency has also surpassed its 123 units from its usual fiscal year funding. "It's been interesting ramping up like this, but we've put our agency in a position the last couple of years to be able to do more creative

51

North Carolina School of Science and Mathematics from Durham, NC and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

North Carolina School of Science and Mathematics from Durham, NC North Carolina School of Science and Mathematics from Durham, NC and Albuquerque Academy from Albuquerque, NM Win the U.S. Department of Energy National Science Bowl North Carolina School of Science and Mathematics from Durham, NC and Albuquerque Academy from Albuquerque, NM Win the U.S. Department of Energy National Science Bowl May 3, 2010 - 12:00am Addthis WASHINGTON, D.C. - A high school team from Durham and a middle school team from Albuquerque won the 2010 U.S. Department of Energy (DOE) National Science Bowl today at the National Building Museum in Washington. North Carolina School of Science and Mathematics beat Mira Loma High School from Sacramento CA in the high school national championship match by correctly answering a chemistry question. Albuquerque Academy beat Gale

52

N.C. Agency Growing, Helping Citizens Save Money | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

N.C. Agency Growing, Helping Citizens Save Money N.C. Agency Growing, Helping Citizens Save Money N.C. Agency Growing, Helping Citizens Save Money March 12, 2010 - 5:20pm Addthis Reginald Speight, CEO of Martin County Community Action | Photo courtesy of Martin County Community Action Reginald Speight, CEO of Martin County Community Action | Photo courtesy of Martin County Community Action Joshua DeLung North Carolina will receive $132 million, or 10 times more money than in years past, for its weatherization program through the Recovery Act. Martin County Community Action is tasked with weatherizing about 1,029 units with its $7.7 million share. The agency has also surpassed its 123 units from its usual fiscal year funding. "It's been interesting ramping up like this, but we've put our agency in a position the last couple of years to be able to do more creative

53

AREVA Enrichment Services LLC  

E-Print Network (OSTI)

Commission (NRC) to construct and operate the EREF (Ref. 1). In August 2009, the NRC issued an RAI to AES requesting additional information to support its evaluation of the cumulative impacts of the off-site transmission lines (Ref. 2). AES provided additional information to the NRC on September 9, 2009 (Ref 3). In our letter of January 27, 2010, we summarized our decision to remove the redundant west transmission line from the license application and indicated AES would revise the response to ER RAI #4 and submit the information by January 29, 2010 (Ref. 4). The revised response to ER RAI #4 is provided in Enclosure 1 and provides the NRC with the information needed to support its evaluation of the cumulative impacts of the offsite transmission line. The EREF License Application will be revised to show the selected transmission line route in the Revision 2. If you have any questions regarding this submittal, please contact me at (508) 573-6554. Respectfully,

Eagle Rock; Enrichment Facility

2010-01-01T23:59:59.000Z

54

Magneto-intersubband oscillations in triple quantum wells S. Wiedmann a,, N.C. Mamani b  

E-Print Network (OSTI)

Magneto-intersubband oscillations in triple quantum wells S. Wiedmann a,?, N.C. Mamani b , G online 24 November 2009 Keywords: Triple quantum well Magneto-intersubband oscillations a b s t r a c t We present magnetotransport studies of high-density triple quantum well samples with different

Gusev, Guennady

55

American Solar Energy Society Proc. ASES Annual Conference, Raleigh, NC, EVALUATION OF NUMERICAL WEATHER PREDICTION  

E-Print Network (OSTI)

OF NUMERICAL WEATHER PREDICTION SOLAR IRRADIANCE FORECASTS IN THE US Richard Perez ASRC, Albany, NY, Perez to solar radiation forecasting include (1) numerical weather prediction (NWP) models that infer local cloud© American Solar Energy Society ­ Proc. ASES Annual Conference, Raleigh, NC, EVALUATION

Perez, Richard R.

56

DOE Awards Management and Operating Contract for DOE's Waste Isolation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management and Operating Contract for DOE's Waste Management and Operating Contract for DOE's Waste Isolation Pilot Plant DOE Awards Management and Operating Contract for DOE's Waste Isolation Pilot Plant April 20, 2012 - 12:00pm Addthis Media Contacts Bill Taylor Environmental Management Consolidated Business Center (803) 952-8564 Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M. - The U.S. Department of Energy (DOE) announced today that Nuclear Waste Partnership LLC (members comprised of URS Energy & Construction, Inc., of Boise, Idaho, and Babcock & Wilcox Technical Services Group, Inc., of Lynchburg, Virginia, and Major Subcontractor, AREVA Federal Services LLC, of Bethesda, Maryland) has been awarded a $1.3 billion contract for management and operating (M&O) at DOE's Waste

57

Doug Speight Senior Commercialization Manager Doug Speight is Senior Commercialization Manager at Oak Ridge National  

NLE Websites -- All DOE Office Websites (Extended Search)

Doug Speight, 865/241-6564, dspeight@ornl.gov Doug Speight, 865/241-6564, dspeight@ornl.gov Doug Speight Senior Commercialization Manager Doug Speight is Senior Commercialization Manager at Oak Ridge National Laboratory where he focuses on intellectual property management and technology commercialization opportunities. In addition to holding past leadership appointments at North Carolina A&T State University (NC A&T), he has ten years of technology transfer and commercialization experience with both NC A&T and NASA and seven years of entrepreneurial experience in a tech-based startup. Speight formerly served as the Assistant Vice Chancellor for Outreach & Economic Development at NC A&T where his duties included management of Technology Transfer, Venture Development and

58

File:USDA-CE-Production-GIFmaps-NC.pdf | Open Energy Information  

Open Energy Info (EERE)

NC.pdf NC.pdf Jump to: navigation, search File File history File usage North Carolina Ethanol Plant Locations Size of this preview: 776 × 600 pixels. Full resolution ‎(1,650 × 1,275 pixels, file size: 355 KB, MIME type: application/pdf) Description North Carolina Ethanol Plant Locations Sources United States Department of Agriculture Related Technologies Biomass, Biofuels, Ethanol Creation Date 2010-01-19 Extent State Countries United States UN Region Northern America States North Carolina External links http://www.nass.usda.gov/Charts_and_Maps/Ethanol_Plants/ File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 16:17, 27 December 2010 Thumbnail for version as of 16:17, 27 December 2010 1,650 × 1,275 (355 KB) MapBot (Talk | contribs) Automated bot upload

59

The QCD Phase Diagram: Large Nc, Quarkyonic Matter and the Triple Point  

SciTech Connect

I discuss the phase diagram of QCD in the large N_c limit. Quarkyonic Matter is described. The properties of QCD matter as measured in the abundance of produced particles are shown to be consistent with this phase diagram. A possible triple point of Hadronic Mater, Deconfined Matter and Quarkyonic matter is shown to explain various behaviors of ratios of particles abundances seen in CERN fixed target experiments.

McLerran L.

2010-01-31T23:59:59.000Z

60

Large-Nc estimate of the chiral low-energy constants  

E-Print Network (OSTI)

Chiral low-energy constants incorporate short-distance information from the dynamics involving heavier degrees of freedom not present in the chiral Lagrangian. We have studied the contribution of the lightest resonances to the chiral low-energy constants, up to O(p^6), within a systematic procedure guided by the large-Nc limit of QCD and also including short-distance asymptotic constraints.

J. Portoles

2007-02-18T23:59:59.000Z

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Test Map and Discreteness Criteria for Subgroups in PU(1,n;C)  

E-Print Network (OSTI)

We study the discreteness for non-elementary subgroup G in PU(1, n;C), under the assumption that G satisfies Condition A. Mainly, we present that one can use a test map, which need not to be in G, to examine the discreteness of G, and also show that G is discrete, if every two-loxodromic-generator subgroup of G is discrete.

Li, ChangJun

2011-01-01T23:59:59.000Z

62

Best ManagementBest ManagementBest Management We Know Enough  

E-Print Network (OSTI)

% of the critical a system(s) Correct placement of s · > 75% of the critical a system(s)system(s) · Good maintenance and system(s) system(s) · Good maintenance and system(s)system(s)system(s) NC STATENC STATE system(s) in critical areas area treated with BMP d/or management of thed/or management of the DEPARTMENT

63

Poplar breeding and testing strategies in the NC US: Demonstration of potential yield and consideration of future research needs.  

SciTech Connect

The objective of this project was to extend previous poplar breeding and selection in the NC US by implementing a regional testing system with multiple test locations in Minnesota, Iowa, Wisconsin and Michigan.

Riemenschneider, Don; Berguson, William E; Dickmann, Don; Hall, Richard

2004-06-30T23:59:59.000Z

64

Management  

E-Print Network (OSTI)

Research has indicated that, depending upon driver and passenger characteristics, passengers can have either a positive or negative influence upon driver behaviour. In conclusion to a recent study investigating the roles that passengers can play to influence, positively and negatively, driver behaviour, Regan and Mitsopoulos (2001) recommended, among other things, that the principles of Crew Resource Management (CRM) training may increase passengers ability to positively influence driver behaviour and also drivers ability to accept constructive feedback. The present study investigated the potential application of CRM training within young driver training in the Australian Capital Territory (ACT). This involved a literature review, an analysis of the differences between the driving and aviation domains, an analysis of the team-based activities and the knowledge, skills and attitudes required during driving to perform those activities, consultation with CRM experts from the aviation and medicine domains and the conduct of six focus groups involving young learner drivers, provisional licence drivers and course teachers. The findings indicate that CRM training as part of young driver training in the ACT is a viable concept to pursue. The application of CRM training within young driver training has potential to significantly enhance the positive and reduce the negative effects of passengers on young driver behaviour, and thus the safety of young drivers and passengers alike. The outcomes of this study formed the basis for a set of recommendations for the development of a young driver CRM training program in the ACT.

Young Drivers; Eve Mitsopoulos; Michael Regan; Janet Anderson; Paul Salmon; Jessica Edquist; Ii Report Documentation Page

2005-01-01T23:59:59.000Z

65

The nuclear liquid-gas phase transition at large $N_c$ in the Van der Waals approximation  

E-Print Network (OSTI)

We examine the nuclear liquid-gas phase transition at large number of colors ($N_c$) within the framework of the Van Der Waals (VdW) model. We argue that the VdW equation is appropriate at describing inter-nucleon forces, and discuss how each parameter scales with $N_c$. We demonstrate that $N_c=3$ (our world) is not large with respect to the other dimensionless scale relevant to baryonic matter, the number of neighbors in a dense system $N_N$. Consequently, we show that the liquid-gas phase transition looks dramatically different at $N_c \\to \\infty$ with respect of our world: The critical point temperature becomes of the order of $\\lqcd$ rather than below it. The critical point density becomes of the order of the baryonic density, rather than an order of magnitude below it. These are precisely the characteristics usually associated with the "Quarkyonic phase". We therefore conjecture that quarkyonic matter is simply the large $N_c$ limit of the nuclear liquid, and the interplay between $N_c$ and $N_N$ is the reason why the nuclear liquid in our world is so different from quarkyonic matter. We conclude by suggesting ways our conjecture can be tested in future lattice measurements.

Giorgio Torrieri; Igor Mishustin

2010-06-12T23:59:59.000Z

66

Ultrasonic Examination of Double-Shell Tank 241-AY-102. Examination Completed January 2007  

SciTech Connect

AREVA NC Inc. (AREVA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AY-102. PNNL is responsible for preparing a report(s) that describes the results of the AREVA ultrasonic examinations.

Pardini, Allan F.; Weier, Dennis R.

2007-05-01T23:59:59.000Z

67

Ultrasonic Examination of Double-Shell Tank 241-AN-106. Completed June 2007  

Science Conference Proceedings (OSTI)

AREVA NC Inc. (AREVA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AN-106. PNNL is responsible for preparing a report(s) that describes the results of the AREVA ultrasonic examinations.

Pardini, Allan F.; Weier, Dennis R.

2007-07-24T23:59:59.000Z

68

Ultrasonic Examination of Double-Shell Tank 241-AY-101. Examination Completed March 2007.  

SciTech Connect

AREVA NC Inc. (AREVA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AY-101. PNNL is responsible for preparing a report(s) that describes the results of the AREVA ultrasonic examinations.

Pardini, Allan F.; Weier, Dennis R.

2007-06-01T23:59:59.000Z

69

Real Time Simulation and Visualization of NC Milling Processes for Inhomogeneous Materials on Low-End Graphics Hardware  

E-Print Network (OSTI)

Simulation and visualization of NC milling processes has become an important step in computer aided manufacturing. The usage of stock materials with specific locally varying properties (like density, accuracy, color,. . . ) becomes more and more important with new technologies emerging in the material industry. Our new approach, using volumetric representation, has been adapted to this needs and copes with inhomogeneous material properties. Taking color as one possible material property, our approach enables the visualization of milled wood or compound materials. Furthermore, our approach has been developed with the usage of low-end graphics hardware in mind. The algorithms have been optimized to ensure interactive update rates even on standard personal computers without hardware graphics acceleration. Keywords: NC milling simulation, dexel approach, inhomogeneous material properties 1. Introduction NC milling simulation using computer graphics techniques was proposed some years ag...

Andreas Holger Knig; Eduard Grller

1998-01-01T23:59:59.000Z

70

Developing PWR Aging-Management Strategies for Reactor Vessel ...  

Science Conference Proceedings (OSTI)

AREVA Fuel Condition Index for a Pressurized Water Reactor .... Stress Corrosion Cracking Behavior near the Fusion Boundary of Dissimilar Weld Joint with...

71

Resonance Spin Flavour Precession of Solar Neutrinos After SNO NC Data  

E-Print Network (OSTI)

We present an analysis of the solar neutrino data assuming the deficit of solar neutrinos to be originated from the interaction of their transition magnetic moments with the solar magnetic field. We perform fits to the rates only and global fits and consider separately the existing data prior to the announcement of the SNO NC results, and present data. Predictions for the Borexino experiment are also derived. The solar field profiles are taken both in the radiation zone and core of the sun, and in the convective zone. The latter are chosen so as to exhibit a rapid increase across the bottom of the convective zone and a moderate decrease towards the surface. Regarding the field profiles in the radiative zone and core, it is found that the data show a preference for those cases in which a strong field rests at the solar centre with a steep decrease thereafter. For these, the quality of the global fits is as good as the one from the best oscillation solutions and the same as for the convective zone profiles examined. It is also found that the $\\chi^2$ of the fits increases when the most recent data are considered, owing to the smaller errors involved. This in turn provides more precise predictions for Borexino than previous ones, thus resulting in a clearer possible distinction between magnetic moment and the currently favoured oscillation solutions.

Bhag C. Chauhan; Joao Pulido

2002-06-20T23:59:59.000Z

72

Superscaling in electron-nucleus scattering and its link to CC and NC QE neutrino-nucleus scattering  

E-Print Network (OSTI)

The superscaling approach (SuSA) to neutrino-nucleus scattering, based on the assumed universality of the scaling function for electromagnetic and weak interactions, is reviewed. The predictions of the SuSA model for bot CC and NC differential and total cross sections are presented and compared with the MiniBooNE data. The role of scaling violations, in particular the contribution of meson exchange currents in the two-particle two-hole sector, is explored.

M. B. Barbaro; J. E. Amaro; J. A. Caballero; T. W. Donnelly; R. Gonzalez-Jimenez; M. Ivanov; J. M. Udias

2013-03-26T23:59:59.000Z

73

The theta^+ baryon in soliton models: large Nc QCD and the validity of rigid-rotor quantization  

E-Print Network (OSTI)

A light collective theta+ baryon state (with strangeness +1) was predicted via rigid-rotor collective quantization of SU(3) chiral soliton models. This paper explores the validity of this treatment. A number of rather general analyses suggest that predictions of exotic baryon properties based on this approximation do not follow from large Nc QCD. These include an analysis of the baryon's width, a comparison of the predictions with general large Nc consistency conditions of the Gervais-Sakita-Dashen-Manohar type; an application of the technique to QCD in the limit where the quarks are heavy; a comparison of this method with the vibration approach of Callan and Klebanov; and the 1/Nc scaling of the excitation energy. It is suggested that the origin of the problem lies in an implicit assumption in the that the collective motion is orthogonal to vibrational motion. While true for non-exotic motion, the Wess-Zumino term induces mixing at leading order between collective and vibrational motion with exotic quantum numbers. This suggests that successful phenomenological predictions of theta+ properties based on rigid-rotor quantization were accidental.

Thomas D. Cohen

2003-12-15T23:59:59.000Z

74

Radiological environs study at a fuel fabrication facility. [General Electric Fuel Fabrication Plant at Wilmington, NC  

SciTech Connect

Field studies were conducted to detect environmental contamination from fuel fabrication plant effluents. The plant chosen for study was operated by the General Electric Company, Nuclear Fuel Division, at Wilmington, NC. The facility operates continuously using the ammonium diuranate (ADU) process to convert 2.0 to 2.2% enriched UF/sub 6/ to UO/sub 2/ fuel. Continuous air samplers at five sites measured the concentrations of /sup 234/U and /sup 238/U in air for 36 one-week intervals. River water was sampled at nine locations above and below the plant discharge point during each of three field surveys. The atmospheric concentrations of /sup 234/U and /sup 238/U appeared to vary according to a log-normal distribution. The annual facility release of approximately 2 to 3 mCi uranium to the atmosphere would add from 0.01 to 0.2 fCi/m/sup 3/ uranium in the atmospheric environs. An individual residing continuously at the nearest residence is predicted to receive a 50-year dose commitment of 0.9 mrem to the lung. The approximately 1 Ci/y of uranium liquid effluent released would increase the uranium concentration in Northeast Cape Fear estuary about 3 kilometers downstream by 0.3 pCi/liter. Although this water is not potable and is not used for any potable water supply, ingestion of water containing uranium at this concentration for a year would deliver a 3-mrem dose commitment to the bone.

Lyon, R.J.; Shearin, R.L.; Broadway, J.A.

1978-10-01T23:59:59.000Z

75

2012 SG Peer Review - Day 2 Panel Discussion: Rogelio Sullivan, NC State University  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FREEDM Systems Center FREEDM Systems Center Future Renewable Electric Energy Delivery and Management Rogelio Sullivan Managing Director 2 * To develop an efficient and interactive power grid: * Utilizing revolutionary power electronics technology and information technology * Integrating distributed and scalable renewable energy sources and energy storage with existing power systems * Automate the management of load, generation and storage To create the "Energy Internet" Vision A Global Partnership Industry Membership Pre-College Middle & High Schools US Universities An Engine for Change Driven By: * Focused Research * Industry Participation * Comprehensive Education Programs * Innovation and Technology Commercialization International Comprehensive University Education

76

Management Of Hanford KW Basin Knockout Pot Sludge As Spent Nuclear Fuel  

SciTech Connect

CH2M HILL Plateau Remediation Company (CHPRC) and AREVA Federal Services, LLC (AFS) have been working collaboratively to develop and deploy technologies to remove, transport, and interim store remote-handled sludge from the 10S-K West Reactor Fuel Storage Basin on the U.S. Department of Energy (DOE) Hanford Site near Richland, WA, USA. Two disposal paths exist for the different types of sludge found in the K West (KW) Basin. One path is to be managed as Spent Nuclear Fuel (SNF) with eventual disposal at an SNF at a yet to be licensed repository. The second path will be disposed as remote-handled transuranic (RH-TRU) waste at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, NM. This paper describes the systems developed and executed by the Knockout Pot (KOP) Disposition Subproject for processing and interim storage of the sludge managed as SNF, (i.e., KOP material).

Raymond, R. E. [CH2M HIll Plateau Remediation Company, Richland, WA (United States); Evans, K. M. [AREVA, Avignon (France)

2012-10-22T23:59:59.000Z

77

A Main Steam Safety Valve (MSSV) With Fixed Blowdown According to ASME Section III,Part NC-7512  

Science Conference Proceedings (OSTI)

In 1986, the NRC issued the Information Notice (IN) 86-05 'Main Steam Safety Valve test failures and ring setting adjustments'. Shortly after this IN was issued, the Code was revised to require that a full flow test has to be performed on each CL.2 MSSV by the manufacturer to verify that the valve was adjusted so that it would reach full lift and thus full relieving capacity and would re-close at a pressure as specified in the valve Design Specification. In response to the concern discussed in the IN, the Westinghouse Owners Group (WOG) performed extensive full flow testing on PWR MSSVs and found that each valve required a unique setting of a combination of two rings in order to achieve full lift at accumulation of 3% and re-closing at a blowdown of 5%. The Bopp and Reuther MSSV type SiZ 2507 has a 'fixed blowdown' i.e. without any adjusting rings to adjust the 'blowdown' so that the blowdown is 'fixed'. More than 1000 pieces of this type are successfully in nuclear power plants in operation. Many of them since about 25 years. Therefore it can be considered as a proven design. It is new that an optimization of this MSSV type SiZ 2507 fulfill the requirements of part NC-7512 of the ASME Section III although there are still no adjusting rings in the flow part. In 2000, for the Qinshan Candu unit 1 and 2 full flow tests were performed with 32 MSSV type SiZ 2507 size 8'' x 12'' at 51 bar saturated steam in only 6 days. In all tests the functional performance was very stable. It was demonstrated by recording the signals lift and system pressure that all valves had acceptable results to achieve full lift at accumulation of 3% and to re-close at blowdown of 5%. This is an advantage which gives a reduction in cost for flow tests and which gives more reliability after maintenance work during outage compared to the common MSSV design with an individual required setting of the combination of the two rings. The design of the type SiZ 2507 without any adjusting rings in the flow path is presented. The stable performance depends on the interaction of flow force and spring force. The optimization of the flow path to create a suitable flow-force-curve was managed by Computational Fluid Dynamics (CFD) and flow-force-characteristic-measurements at a model 1: 2.5. The method of the flow-force-characteristic-measurement permits systematic dimensioning of valve spring forces by means of measurement of the fluid mechanical forces occurring on the valve spindle during flow. A special procedure was established to verify a spring force versus lift curve with an accuracy of 1% for each production valve. This gives high reliability at required stable performance and this can not be influenced by wrong setting of any adjusting ring during maintenance work. (authors)

Follmer, Bernhard; Schnettler, Armin [Bopp and Reuther Sicherheitsund Regelarmaturen, GmbH, Mannheim (Germany)

2002-07-01T23:59:59.000Z

78

Baryons and Low-Density Baryonic Matter in 1+1 Dimensional Large N_c QCD with Heavy Quarks  

E-Print Network (OSTI)

This paper studies baryons and baryonic matter in the combined large N_c and heavy quark mass limits of QCD in 1+1 dimension. In this non-relativistic limit, baryons are composed of N_c quarks that interact, at leading order in N_c, through a color Coulomb potential. Using variational techniques, very accurate calculations of single baryon masses and interaction energies of low-density baryon crystal are performed. These results are used to cross-check a general numerical approach applicable for arbitrary quark masses and baryon densities recently proposed by Bringoltz, which is based on a lattice in a finite box with periodic boundary conditions. The Bringoltz method differs from a previous approach of Salcedo, et al. in its treatment of a finite box effect - namely gauge configurations that wind around the box. One might expect these effects to be small for large enough boxes, in which the baryon density approaches zero to high accuracy at the edges. However, the effects of these windings appear to be quite large even in such boxes. The large mass infinite volume calculations performed here are consistent with the results of numerical calculations using the Bringoltz method. The calculation of the baryon crystal interaction energy requires the assumption that at low-densities the ground state is composed of individual baryons, each in a color-singlet state and orthogonal to each other. This assumption is plausible but ad hoc in that one can construct configurations in which the entire state is color-singlet but cannot be broken into individual color-singlet baryons. The interaction energy of low-density baryon crystals calculated with the assumption is consistent with numerical results based on Bringoltz's approach suggesting that the assumption is justified. This further supports a similar assumption that was made in 3+1 dimensions, where no alternative means of calculation exist.

Prabal Adhikari; Thomas D. Cohen; Arec Jamgochian; Nilay Kumar

2012-12-10T23:59:59.000Z

79

Welcome  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cylinders Operation & Construction parallel Separations Building Module 1003 Utility Fuel Cycle Management Diverse Contract Portfolio Cameco, Areva, Kazatomprom, BHP, RTU,...

80

Measurement of airborne fission products in Chapel Hill, NC, USA from the Fukushima Dai-ichi reactor accident  

E-Print Network (OSTI)

We present measurements of airborne fission products in Chapel Hill, NC, USA, from 62 days following the March 11, 2011, accident at the Fukushima Dai-ichi nuclear power plant. Airborne particle samples were collected daily in air filters and radio-assayed with two high-purity germanium (HPGe) detectors. The fission products I-131 and Cs-137 were measured with maximum activities of 4.2 +/- 0.6 mBq/m^3 and 0.42 +/- 0.07 mBq/m^3 respectively. Additional activity from I-131, I-132, Cs-134, Cs-136, Cs-137 and Te-132 were measured in the same air filters using a low-background HPGe detector at the Kimballton Underground Research Facility (KURF).

S. MacMullin; G. K. Giovanetti; M. P. Green; R. Henning; R. Holmes; K. Vorren; J. F. Wilkerson

2011-11-17T23:59:59.000Z

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Measurement of Airborne Fission Products in Chapel Hill, NC, USA from the Kukushima Dai-ichi Reactor Accident  

SciTech Connect

We present measurement results of airborne fission products in Chapel Hill, NC, USA, from 62 d following the March 11, 2011, accident at the Fukushima Dai-ichi nuclear power plant. Airborne particle samples were collected daily in air filters and radio-assayed with two high-purity germanium (HPGe) detectors. The fission products 131I and 137Cs were measured with maximum activity concentrations of 4.2 0.6 mBq/m3 and 0.42 0.07 mBq/m3 respectively. Additional activity from 131,132I, 134,136,137Cs and 132Te were measured in the same air filters using a low-background HPGe detector at the Kimballton Underground Research Facility (KURF).

MacMullin, S. [Univ, of North Carolina & Triangle Universities Nucl. Lab - Durham, NC; Giovanetti, G. K. [Univ, of North Carolina & Triangle Universities Nucl. Lab - Durham, NC; Green, M. P. [Univ, of North Carolina & Triangle Universities Nucl. Lab - Durham, NC; Henning, R. [Univ, of North Carolina & Triangle Universities Nucl. Lab - Durham, NC; Holmes, R. [Univ. North Carolina-Chapel & Univ. of Illinois-Urbana; Vorren, K. [University of North Carolina / Triangle Universities Nuclear Lababoratory, Durham; Wilkerson, J. F. [UNC/Triangle Univ. Nucl. Lab, Durham, NC/ORNL

2012-01-01T23:59:59.000Z

82

Evolutionary Significance of an Algal Gene Encoding an [FeFe]-Hydrogenase with F-Domain Homology and Hydrogenase Activity in Chlorella Variabilis NC64A  

SciTech Connect

[FeFe]-hydrogenases (HYDA) link the production of molecular H{sub 2} to anaerobic metabolism in many green algae. Similar to Chlamydomonas reinhardtii, Chlorella variabilis NC64A (Trebouxiophyceae, Chlorophyta) exhibits [FeFe]-hydrogenase (HYDA) activity during anoxia. In contrast to C. reinhardtii and other chlorophycean algae, which contain hydrogenases with only the HYDA active site (H-cluster), C. variabilis NC64A is the only known green alga containing HYDA genes encoding accessory FeS cluster-binding domains (F-cluster). cDNA sequencing confirmed the presence of F-cluster HYDA1 mRNA transcripts, and identified deviations from the in silico splicing models. We show that HYDA activity in C. variabilis NC64A is coupled to anoxic photosynthetic electron transport (PSII linked, as well as PSII-independent) and dark fermentation. We also show that the in vivo H{sub 2}-photoproduction activity observed is as O2 sensitive as in C. reinhardtii. The two C. variabilis NC64A HYDA sequences are similar to homologs found in more deeply branching bacteria (Thermotogales), diatoms, and heterotrophic flagellates, suggesting that an F-cluster HYDA is the ancestral enzyme in algae. Phylogenetic analysis indicates that the algal HYDA H-cluster domains are monophyletic, suggesting that they share a common origin, and evolved from a single ancestral F-cluster HYDA. Furthermore, phylogenetic reconstruction indicates that the multiple algal HYDA paralogs are the result of gene duplication events that occurred independently within each algal lineage. Collectively, comparative genomic, physiological, and phylogenetic analyses of the C. variabilis NC64A hydrogenase has provided new insights into the molecular evolution and diversity of algal [FeFe]-hydrogenases.

Meuser, J. E.; Boyd, E. S.; Ananyev, G.; Karns, D.; Radakovits, R.; Murthy, U. M. N.; Ghirardi, M. L.; Dismukes, G. C.; Peters, J. W.; Posewitz, M. C.

2011-10-01T23:59:59.000Z

83

DOE - Office of Legacy Management -- North Carolina State University...  

Office of Legacy Management (LM)

the measurement of the thermal properties of certain granular materials in 1953 and 1954. NC.01-1 NC.01-4 NC.01-5 Site Disposition: Eliminated - Potential for contamination...

84

RFI for NC  

NLE Websites -- All DOE Office Websites (Extended Search)

Statement of Energy Service Requirements Statement of Energy Service Requirements & Format for Responses to a Request for Information GENERAL INFORMATION Document Type: Request for Information Posted Date: June 12, 2003 Original Response Date: June 26, 2003 Classification Code: 99-Miscellaneous-Renewable Energy/Renewable Energy Certificates (REC) DESCRIPTION The Federal Government is seeking interested parties to potentially supply renewable energy/REC in North Carolina behind the Duke Energy Service Territory, with the possibility of other locations as well. Requirements are estimated at approximately 30 million kWh. We are seeking Green-e certified (or the equivalent) REC, or renewable energy located close to North Carolina, but not necessarily within the state.

85

Durham, NC 27708  

DOE Green Energy (OSTI)

In the Krafla hydrothermal system in Iceland, both MT polarization and MEQ splitting directions align with

Malin, Peter E.; Shalev, Eylon; Onacha, Stepthen A.

2006-12-15T23:59:59.000Z

86

Management Plan Management Plan  

E-Print Network (OSTI)

of a coevolving naturalcultural system. Suitable ecosystem attributes can be achieved by managing human maintenance that protects the riparian corridor. · Manage recreational use to protect riparian values Creek and the Warm Springs River during runoff periods. · Road systems and upland management practices

87

Decommissioning Nuclear Facilities: First lessons Learned from UP1, Marcoule, France  

Science Conference Proceedings (OSTI)

On September 30, 1997, UP1, Marcoule Fuel reprocessing facility, dissolved its last spent Fuel rod. Final shutdown and stage 1 decommissioning began immediately after, under the supervision of CODEM , a consortium composed of The French Atomic Energy Commission, COGEMA, France fuel Cycle Company and EDF, the French Electricity Utility. The goal of the decommissioning program was to achieve stage 2 decommissioning , as per IAEA standards, within a period of about 15 years. 10 years later, a significant amount of decontamination and decommissioning works has been conducted with success. The contractual structure under which the program was launched has been profoundly modified, and the capacity of The French Atomic Energy Commission (CEA) and AREVA NC to complete full decommissioning programs has been confirmed. In the present document, we propose to examine the main aspects involved in the management of such decommissioning programs, and highlight, with significant examples, the main lessons learnt. In conclusion: As of 2007, UP1 decommissioning program proves to be a success. The choice of early decommissioning, the partnership launched between the French Atomic Energy Commission as owner of the site and decommissioning fund, with AREVA NC as operator and main contractor of the decommissioning works has been a success. The French Atomic Energy commission organized a contractual framework ensuring optimal safety conditions and work completion, while AREVA NC gained a unique experience at balancing the various aspects involved in the conduction of complete decommissioning programs. Although such a framework may not be applicable to all situations and facilities, it provides a positive example of a partnership combining institutional regulations and industrial efficiency.

Chabeuf, Jean-Michel; Boya, Didier [AREVA, AREVA NC Marcoule, 30130 Bagnols sur Ceze (France); CEA, Marcoule, 30130 Bagnols sur Ceze (France)

2008-01-15T23:59:59.000Z

88

Lit ~ AREVA Enrichment Services LLC-7 7,  

E-Print Network (OSTI)

(EREF) in Bonneville County, Idaho. AES hereby notifies the NRC of its intent to revise the License Application for the EREF by expanding the capacity of the facility from 3.3 million separative work units (SWU) per year to 6.6 million SWU per year. In recent months, AES ' confidence has increased regarding the construction of new reactors both in the United States and other countries. Based on this evolving scenario and the fact that the NRC has just begun its review of the EREF License Application, AES has decided to revise the application to increase facility capacity to 6.6 million SWU per year. While AES is still planning to build a 3.3 million SWU per year facility, this revision provides AES the ability to expand the EREF should market conditions favor increased capacity for uranium enrichment services. AES plans to submit the revision to the EREF License Application by April 23, 2009. In addition; AES will submit a roadmap to define the anticipated changes to the License Application by April 6, 2009. The roadmap will facilitate the NRC's Staff's review of the current application and understanding of the impacts of the intended revision.

Sam Shakir; Eagle Rock; Enrichment Facility; Eagle Rock; Enrichment Facility

2009-01-01T23:59:59.000Z

89

Management Programs  

NLE Websites -- All DOE Office Websites (Extended Search)

3MS Environment and Waste Management Programs Environment and Waste Management Programs Environment and Waste Management Programs AN L-934 Surveillance of Site A and Plot M...

90

Management Programs  

NLE Websites -- All DOE Office Websites (Extended Search)

Environment and Waste Management Programs Environment and Waste Management Programs Environment and Waste Management Programs AN L-9213 Surveillance of Site A and Plot M Report...

91

Management Programs  

NLE Websites -- All DOE Office Websites (Extended Search)

r Environment and Waste Management Programs Environment and Waste Management Programs Environment and Waste Management Programs ANL-949 Surveillance of Site A and Plot M Report...

92

Developing a Motor Management Policy at BASF  

E-Print Network (OSTI)

In early 1998 Thomas R. Theising, BASF Corporate Engineering initiated the formation of a motor management team. The goal of the team was to develop a Motor Management Guideline to better manage the purchase and repair of motors used throughout the company. BASF draws a 240MW electrical power load. Accepting that 70% (industry standards range from 63 to 75% for BASF's businesses) of this load was consumed by rotating equipment and assuming an average cost of$401MWh at 8400 hours of annual operation BASF spends over $56M annually to operate electric motors. A guideline to better manage the purchase and repair of these motors could reduce this operating cost by 3 to 5%, which translates to $1.7M to $2.8M annually. An estimated total cost to BASF for implementation is $200K. The development of a Motor Management Guideline required the cooperative effort of a team of individuals. This team consisted of representatives from several BASF manufacturing locations, Corporate Engineering, Corporate Purchasing and Energy Management. Also, BASF included representatives from Duke Power and from Advanced Energy (AE). Advanced Energy had previously provided motor testing services to the BASF facility in Enka, NC.

Zickefoose, B.; Theising, T. R.

2001-05-01T23:59:59.000Z

93

Performance Management  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Performance Management. ... If you are unable to access these PDF files, please contact the Office of Workforce Management.

2013-04-20T23:59:59.000Z

94

U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

). ). U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:NC Department of Commerce, Slate Energy Office PROJECT TITLE: Energy Conservation Programs in Transportation - City of Kinston Page 1 of2 STATE: NC Funding Opportunity Announcement Number Procurement Instrument Numbu NEPA Control Number elD Number DE-EEOOOO771 GFO-OOOO771-012 0 Based on my review of the Information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4Sl.IA), I have made the (ollowlng determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency thai do not increase the Indoor concentrations of potentially harmful substances. These actions may involve financial and technical

95

Managing time  

Science Conference Proceedings (OSTI)

Professionals overwhelmed with information glut can find hope from new insights about time management.

Peter J. Denning

2011-03-01T23:59:59.000Z

96

Management Responsibilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Responsibilities Management Responsibilities Depleted UF6 Management Responsibilities DOE has responsibility for safe and efficient management of approximately 700,000 metric tons of depleted UF6. Organizational Responsibilities In the United States, the U.S. Department of Energy is responsible for managing all the depleted uranium that has been generated by the government and has been declared surplus to national defense needs. In addition, as a result of two memoranda of agreement that have been signed between the DOE and USEC, the DOE has assumed management responsibility for approximately 145,000 metric tons of depleted UF6 that has been or will be generated by USEC. Any additional depleted UF6 that USEC generates will be USEC's responsibility to manage. DOE Management Responsibility

97

Federal Energy Management Program: Energy Management Guidance  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Management Energy Management Guidance to someone by E-mail Share Federal Energy Management Program: Energy Management Guidance on Facebook Tweet about Federal Energy Management Program: Energy Management Guidance on Twitter Bookmark Federal Energy Management Program: Energy Management Guidance on Google Bookmark Federal Energy Management Program: Energy Management Guidance on Delicious Rank Federal Energy Management Program: Energy Management Guidance on Digg Find More places to share Federal Energy Management Program: Energy Management Guidance on AddThis.com... Requirements by Subject Requirements by Regulation Notices & Rules Guidance Facility Reporting Fleet Reporting Energy Management Guidance The Federal Energy Management Program (FEMP) provides guidance on Federal

98

Record of Decision for the Department of Energy's Waste Management Program: Storage of High-Level Radioactive Waste (08/26/99)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

661 661 Federal Register / Vol. 64, No. 165 / Thursday, August 26, 1999 / Notices Installation State Function(s) Total au- thorizations Public an- nounce- ment date Solicitation issued or scheduled date SELFRIDGE ......................... MI FUELS MANAGEMENT ..................................................... 8 01-Jun-98 27-Apr-99. SELFRIDGE ......................... MI TRANSIENT AIRCRAFT MAINTENANCE ......................... 8 04-Jun-98 28-Apr-99. SEYMOUR JOHNSON ......... NC TRANSIENT AIRCRAFT MAINTENANCE ......................... 8 12-Nov-97 02-Jul-99. SHAW ................................... SC COMMUNICATION FUNCTIONS ....................................... 3 18-May-99 09-May-00. SHAW ................................... SC LIBRARY .............................................................................

99

OSSA - An optimized approach to severe accident management: EPR application  

SciTech Connect

There is a recognized need to provide nuclear power plant technical staff with structured guidance for response to a potential severe accident condition involving core damage and potential release of fission products to the environment. Over the past ten years, many plants worldwide have implemented such guidance for their emergency technical support center teams either by following one of the generic approaches, or by developing fully independent approaches. There are many lessons to be learned from the experience of the past decade, in developing, implementing, and validating severe accident management guidance. Also, though numerous basic approaches exist which share common principles, there are differences in the methodology and application of the guidelines. AREVA/Framatome-ANP is developing an optimized approach to severe accident management guidance in a project called OSSA ('Operating Strategies for Severe Accidents'). There are still numerous operating power plants which have yet to implement severe accident management programs. For these, the option to use an updated approach which makes full use of lessons learned and experience, is seen as a major advantage. Very few of the current approaches covers all operating plant states, including shutdown states with the primary system closed and open. Although it is not necessary to develop an entirely new approach in order to add this capability, the opportunity has been taken to develop revised full scope guidance covering all plant states in addition to the fuel in the fuel building. The EPR includes at the design phase systems and measures to minimize the risk of severe accident and to mitigate such potential scenarios. This presents a difference in comparison with existing plant, for which severe accidents where not considered in the design. Thought developed for all type of plants, OSSA will also be applied on the EPR, with adaptations designed to take into account its favourable situation in that field. This revised approach will incorporate a number of new features which will simplify and streamline the guidance material while ensuring comprehensive guidance for response to any severe accident. Examples of such features include : - Identification of severe accident challenges based on plant specific studies. - Revision of the split of responsibilities between operations and technical support center staff. - Fixed setpoint entry conditions, ensuring that the transition from emergency procedures takes place at a consistent core/fuel condition (regardless of scenario), and which fixes the time window available to attempt ultimate preventive measures. - A safety function concept for monitoring plant conditions (in the control room). - An integrated graphic-based diagnostic tool including entry condition, challenge prioritization, and exit condition monitoring to be used by the technical support team. This paper describes the basic features of OSSA, and project status. (authors)

Sauvage, E. C.; Prior, R.; Coffey, K. [AREVA, FRAMATOME-ANP SAS, Paris, 92084 La Defense (France); Mazurkiewicz, S. M. [AREVA, FRAMATOME-ANP Inc, Lynchburg, VA 24506-0935 (United States)

2006-07-01T23:59:59.000Z

100

Federal Energy Management Program: Computerized Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Computerized Maintenance Management Systems to someone by E-mail Share Federal Energy Management Program: Computerized Maintenance Management Systems on Facebook Tweet about Federal Energy Management Program: Computerized Maintenance Management Systems on Twitter Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Google Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Delicious Rank Federal Energy Management Program: Computerized Maintenance Management Systems on Digg Find More places to share Federal Energy Management Program: Computerized Maintenance Management Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

[(CH3)4N][(C5H5NH)0.8((CH3)3NH)0.2]U2Si9O23F4 (USH-8): An Organically Templated Open-Framework Uranium Silicate  

E-Print Network (OSTI)

-Framework Uranium Silicate Xiqu Wang, Jin Huang, and Allan J. Jacobson* Department of Chemistry, Uni pyramids we obtained also a number of open-framework uranium silicates.18,19 These new compounds were-framework uranium fluorosilicate [(CH3)4N][(C5H5NH)0.8((CH3)3NH)0.2]U2Si9O23F4 (USH- 8) that has been synthesized

Wang, Xiqu

102

Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Documentation and Quality Assurance for Data Sharing and Archival Now that you have planned your project and data management, collected data, integrated imagery, or generated model...

103

SUBCONTRACT MANAGEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-1 -1 CHAPTER 10 SUBCONTRACT MANAGEMENT (Revised October 19, 2011) WHAT ARE THE BASIC PRINCIPLES AND OBJECTIVES OF SUBCONTRACT MANAGEMENT? 1. To ensure contractors establish, document, and maintain adequate purchasing systems. 2. To ensure contractors flow down contract requirements to subcontractors. WHY IS SUBCONTRACT MANAGEMENT IMPORTANT? In many Department prime contracts a significant portion of the obligated dollars is spent on subcontract work. Due to the absence of a direct contractual relationship with the subcontractor, the Department must rely on the prime contractor to manage subcontract work. Subcontractors perform significant work efforts at sites and are an integral part of the site's success. Prime

104

Reservation Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Reservation Management The ORR is home to three major facility complexes: the East Tennessee Technology Park (ETTP), the National Nuclear Security Administration's (NNSA's) Y-12...

105

Management Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

to global waste vitrification and related programs Serve as a technical platform for DOE reviews Environmental Management Leadership Team Responsible for identifying or...

106

Management Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Plan (SSMP) to be submitted to Congress after the April 2010 release of the Nuclear Posture Review Report. It is aligned with the President's National Security Strategy...

107

Chemical Engineering NC State University  

E-Print Network (OSTI)

Ameristeel Christy Taylor Angelo Jonathan Rice Madeha Baqai Caldwell Natalie Scurry Austin Kizzie Jessica

Velev, Orlin D.

108

DEACTIVATION MANAGEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT MANAGEMENT The purpose here is to provide information for specific aspects of project management that apply to deactivation. Overall management of deactivation projects should use a traditional project management approach, and as such is not addressed. The following specific topics are based on lessons learned during deactivation of DOE facilities.  The Deactivation Mission  The Stabilization/Deactivation "Customer"  Project Approach for a Complex Facility  Establishing the Overall End-State  Viewing Deactivation in Two Phases  Early Decisions  Early Deactivation Tasks  Facility-Specific Commitments  Hazard Reduction  Detailed End-Points  Set Up Method and Criteria  Post-Deactivation S&M Plan

109

Safety & Emergency Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Coordination Management andor Coordination of APS Site WorkServices Safety & Emergency Management Database Maintenance Personnel Safety & Emergency Management Area...

110

Environmental Management Waste Management Facility (EMWMF) at...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

111

Organization Update Assistant Manager for Environmental Management  

NLE Websites -- All DOE Office Websites (Extended Search)

EM-90 Office of the Manager Mark Whitney, Manager Sue Cange, Deputy Manager Brenda Hawks, Senior Technical Advisor Karen Ott, Chief of Staff Karen Forester, Administrative...

112

Federal Energy Management Program: Federal Energy Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Energy Management Program Contacts to someone by E-mail Share Federal Energy Management Program: Federal Energy Management Program Contacts on Facebook Tweet about Federal...

113

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Management Requirements by Subject to someone by E-mail Share Federal Energy Management Program: Energy Management Requirements by Subject on Facebook Tweet about Federal...

114

Federal Energy Management Program: Best Management Practice:...  

NLE Websites -- All DOE Office Websites (Extended Search)

to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Water-Efficient Irrigation on Facebook Tweet about Federal Energy Management Program: Best...

115

Federal Energy Management Program: Computerized Maintenance Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Maintenance Management Systems Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and...

116

Management Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Immobilization Research Immobilization Research Kurt Gerdes U.S. DOE, Office of Engineering and Technology John Vienna Pacific Northwest National Laboratory Environmental Management May 19, 2009 2009 Hanford - Idaho - Savannah River Technical Exchange 2 Objectives Perform research and development to advance the waste stabilization technology options by through closely- coupled theory, experimentation, and modeling Develop solutions for Hanford, Idaho, Savannah River, and Oak Ridge wastes challenges (along with facilitating management of future wastes) Environmental Management General Approach Balance between near-term incremental technology improvements and long-term transformational solutions Address the requirements for high risk waste streams - high-level tank waste (RPP, SRS)

117

Work Manager  

Science Conference Proceedings (OSTI)

A real-time control system has been developed and deployed nationally to support BTs work management programme. This paper traces the history, system architecture, development, deployment and service aspects of this very large programme. Many ...

G. J. Garwood

1997-01-01T23:59:59.000Z

118

Management Solution  

E-Print Network (OSTI)

MEMO: Request for proposal for Computer-Aided Facilities and Maintenance Management application software; professional services; development services for interfaces to Financial Management and Human Resources systems; configuration, test, train, maintenance and support services to implement and maintain a CAFM Solution for the California Administrative Office of the Courts, the Trial Courts, the Appellate Courts and the Judicial Council, known as The AOC Group. You are invited to review and respond to the attached Request for Proposal (RFP):

Rfp Number Isdcafm

2004-01-01T23:59:59.000Z

119

Airflow Management  

Science Conference Proceedings (OSTI)

This technical update provides an overview of airflow management, with an emphasis on how reduced airflow can improve energy efficiency in data centers. Airflow management within a data center can have a dramatic impact on energy efficiency. Typically, much more cold air circulates within conventional data centers than is actually needed to cool equipment related to information and communication technology (ICT). It is not uncommon for facilities to supply more than two to three times the minimum require...

2011-12-14T23:59:59.000Z

120

EE RE PROJECT MANAG EMENT CENTER NEPA DETERr-IINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

>,RTr-lENT OF ENERGY >,RTr-lENT OF ENERGY EE RE PROJECT MANAG EMENT CENTER NEPA DETERr-IINATION Page 1 of2 RECIPIENT:North Carolina Department of Commerce. State Energy Office STATI<:: NC PROJECT TITLE: Energy Conservation Programs in Transportation - Sandhills Community Coliege Funding Opportunity Announcement Number Procurement Instrument Number DE-EEOOOO771 NEPA Control Number GFO-OOOO771-014 em Number o Based on my review or the infonnation concerning the proposed action, as NEPA Compliance Officer (autboriud under DOE Order 451.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Video Community, Environment Environmental Stewardship Environmental Protection Environmental Management System Environmental Management System An Environmental...

122

Quality System Documentation Management  

Science Conference Proceedings (OSTI)

Quality System Documentation Management. ... Minutes, summaries, or notes from Management Meetings of significance are archived here. ...

2012-08-21T23:59:59.000Z

123

NIST Performance Management Program  

Science Conference Proceedings (OSTI)

NIST Performance Management Program. Performance ... appraisal. APMS and FWS Performance Management Programs: ...

2010-10-05T23:59:59.000Z

124

Presidential Management Fellows Program  

Science Conference Proceedings (OSTI)

Presidential Management Fellows Program. Summary: About the Program: The Presidential Management Fellows (PMF ...

2012-08-31T23:59:59.000Z

125

Crypto Key Management Framework  

Science Conference Proceedings (OSTI)

... A Framework for Designing Cryptographic Key Management Systems ... A Framework for Designing Cryptographic Key Management Systems ...

2013-08-13T23:59:59.000Z

126

MANAGEMENT SUMMARY  

E-Print Network (OSTI)

need to effectively manage business performance. This has never been more true than in todays complex, highly regulated and confusing business environment which requires better decisions and improved execution now! In spite of the billions of dollars invested in infor-mation technology to address these challenges, managers and executives in many organizations still make key decisions underpinned by their own personal versions of documents and spread-sheets. Their organization struggles to provide a seamless flow of trusted information between customers, suppliers and their employees. The result is that most organizations cannot provide their people with the right information at the right time, and in attempting to do so are committing significant resources to compiling and auditing numbers instead of using them to inform the business. Consequently, they are far more reac-tive than proactive and ultimately they are not efficiently and effectively managing their current and future performance. Leading organizations are investing in managing information and developing predictive insights to drive sustainable business results. These com-panies have become masters in Performance Management- going beyond mere users of business intelligence to become the Intelligent Enterprises. ...a new breed of company is upping the stakes....have dominated their fields by deploy-ing industrial-strength analytics across a wide variety of activities. In essence, they are trans-forming their organiza-tions into armies of killer apps and crunching their way to victory.

unknown authors

2006-01-01T23:59:59.000Z

127

Operational Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Operational Management Aviation Management Executive Secretariat Energy Reduction at HQ Facilities and Infrastructure Federal Advisory Committee Management Freedom of...

128

Aviation Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Aviation Management Aviation Management Aviation Management Executive Secretariat Energy Reduction at HQ Facilities and Infrastructure Federal Advisory Committee Management Freedom...

129

Categorical Exclusion Determinations: Environmental Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Categorical Exclusion Determinations: Environmental Management Categorical Exclusion Determinations issued by Environmental Management. DOCUMENTS AVAILABLE...

130

Resources, and the United States Environmental Protection AgencyDesigning Rate Structures that Support Your Objectives: Guidelines for NC Water Systems  

E-Print Network (OSTI)

The purpose for these rate setting guidelines is to provide water and wastewater utility managers and technical assistance providers with a framework in setting water and wastewater rates and rate structures that would meet the states and the utilitys policies and objectives. These guidelines provide step by step instructions and necessary information to allow the utility manager to make an informed policy-driven choice on the rate structure design. These guidelines do not provide instruction on how to project revenues and costs and how to calculate rates (dollar amounts) to balance a budget, but references other documents that provide such guidelines. These rate setting guidelines were developed by the Environmental Finance Center at the

unknown authors

2009-01-01T23:59:59.000Z

131

ORISE: Emergency Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Emergency Management Effective emergency management relies on thorough integration of preparedness plans at all levels of government. The Oak Ridge Institute for Science...

132

Federal Energy Management Program: Best Management Practice: Water  

NLE Websites -- All DOE Office Websites (Extended Search)

Water Management Planning to someone by E-mail Water Management Planning to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Water Management Planning on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Water Management Planning on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Water Management Planning on Google Bookmark Federal Energy Management Program: Best Management Practice: Water Management Planning on Delicious Rank Federal Energy Management Program: Best Management Practice: Water Management Planning on Digg Find More places to share Federal Energy Management Program: Best Management Practice: Water Management Planning on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

133

Federal Energy Management Program: Best Management Practice: Cooling Tower  

NLE Websites -- All DOE Office Websites (Extended Search)

Cooling Tower Management to someone by E-mail Cooling Tower Management to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Google Bookmark Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Delicious Rank Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Digg Find More places to share Federal Energy Management Program: Best Management Practice: Cooling Tower Management on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

134

MUSHROOM WASTE MANAGEMENT PROJECT LIQUID WASTE MANAGEMENT  

E-Print Network (OSTI)

#12;MUSHROOM WASTE MANAGEMENT PROJECT LIQUID WASTE MANAGEMENT PHASE I: AUDIT OF CURRENT PRACTICE The Mushroom Waste Management Project (MWMP) was initiated by Environment Canada, the BC Ministry of solid and liquid wastes generated at mushroom producing facilities. Environmental guidelines

135

Overview of AREVA Logistics Business Unit Capabilities and Expertise...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Working Group Topic Groups Rail Key Documents Planning Subgroup Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched Uranium EA-1607: Final Environmental...

136

Washington Post Energy Conference Presented by Areva | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

money for serious science in areas like supercomputing, nanotechnology, advanced nuclear reactor technologies, and fusion energy. The results may not be seen for decades, but the...

137

Summary - Environmental Management Waste Management Facility...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ETR Report Date: February 2008 ETR-11 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of Environmental Management...

138

Federal Energy Management Program: Best Management Practice:...  

NLE Websites -- All DOE Office Websites (Extended Search)

Faucets and Showerheads to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Faucets and Showerheads on Facebook Tweet about Federal Energy...

139

Federal Energy Management Program: Best Management Practice:...  

NLE Websites -- All DOE Office Websites (Extended Search)

Other Water Intensive Processes to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Other Water Intensive Processes on Facebook Tweet about...

140

Federal Energy Management Program: Best Management Practice:...  

NLE Websites -- All DOE Office Websites (Extended Search)

Water-Efficient Landscaping to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Water-Efficient Landscaping on Facebook Tweet about Federal...

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

U.S. DEP.~TMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT CENTER MANAGEMENT CENTER NEPADETEIU.llNATION RECIPIENT:Duke Energy Business Services l LC PROJECT TITLE: Carolinas Offshore Wind Integration Case Study Page 1 of2 STATE: NC Funding Opportunity Announ~emenf Number Pnxurement InUrumeDt Number NEPA Control Number em Number DE-FOA-0000414 DE-EEOOO5368 GF0-0Q05368-001 0 Based on my review orlhe information c:om:erning Ihe proposed aetion, as NEPA Complianc:e omen (authorized uDder DOE Order 451.1A), I have made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination Information gathering (induding, but not limited to, literature surveys, inventories, site visits, and audits), data analysis (including, but nollimiled to, computer modeling). document preparation (including. but not limited to. conceptual design.

142

UNIVERSITE PARIS-SUD 11 COLE DOCTORALE : Modlisation et Instrumentation en Physique,  

E-Print Network (OSTI)

. This library was next used to realize a numerical calibration of the AREVA NC La Hague in vivo counting installation. Moreover, the morphology-induced counting efficiency variations with energy were put with different detector positioning. Next, the contribution of each contaminated organ to the count is assessed

Paris-Sud XI, Université de

143

DUF6 Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Depleted UF6 Management An introduction to DOE's Depleted UF6 Management Program. The mission of the DOE's Depleted UF6 Management Program is to safely and efficiently...

144

Your Records Management Responsibilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Your Records Management Your Records Management Responsibilities Table of Contents INTRODUCTION RECORDS MANAGEMENT IN THE FEDERAL GOVERNMENT RECORDS MANAGEMENT IN THE DEPARTMENT OF ENERGY IMPORTANCE OF RECORDS MANAGEMENT YOUR RECORDS MANAGEMENT RESPONSIBILITIES RECORDS MANAGEMENT LIFE CYCLE ELECTRONIC RECORDS & RECORDKEEPING LAW, REGULATION, AND POLICY ASSISTANCE RECORDS MANAGEMENT TERMS 2 INTRODUCTION If you are a government employee or contractor working for a federal agency, records management is part of your job. This pamphlet explains your responsibilities for federal records and provides the context for understanding records management in the federal government and in the Department of Energy. TOP RECORDS MANAGEMENT IN THE FEDERAL GOVERNMENT

145

Integrated Safety Management Policy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INTEGRATED SAFETY INTEGRATED SAFETY MANAGEMENT SYSTEM DESCRIPTION U.S. DEPARTMENT OF ENERGY Office of Environmental Management Headquarters May 2008 Preparation: Braj K. sin& Occupational Safety and Health Manager Office of Safety Management Concurrence: Chuan-Fu wu Director, Offlce of Safety Management Deputy Assistant Secretary for safe& Management andoperations Operations Officer for 1 Environmental Management Approval: Date p/-g Date Environmental Management TABLE OF CONTENTS ACRONYMS................................................................................................................................................................v EXECUTIVE SUMMARY .........................................................................................................................................1

146

Managing time, part 2  

Science Conference Proceedings (OSTI)

Masterful time management means not just tracking of messages in your personal environment, but managing your coordination network with others.

Peter J. Denning; Ritu Raj

2011-09-01T23:59:59.000Z

147

Environmental Management Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Management Systems Technical Assistance Tools Technical Assistance Tool: Integrating Sustainable Practices into Environmental Management Systems , November 2009...

148

Managing PCBs  

Science Conference Proceedings (OSTI)

Compliance with Environmental Protection Agency regulations for managing the polychlorinated biphenyls (PCBs) that were widely distributed in electrical equipment will be costly to the utility industry, estimated at over $5 billion over a ten-year period by the Electric Power Research Institute (EPRI). Most of the budget could be needed to identify and reclaim 2.5 million contaminated transformers. Three divisions are coordinating EPRI research efforts with those of other companies and utilities in the areas of detection, destruction, spill cleanup, disposal, and health effects. (DCK)

Lihach, N.

1981-10-01T23:59:59.000Z

149

M E Environmental Management Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

safety  performance  cleanup  closure safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management Office of Site Restoration, EM-10 Office of D&D and Facility Engineering, EM-13 Facility Deactivation & Decommissioning (D&D) D&D Program Map Addendum: Impact of American Recovery and Reinvestment Act (ARRA) on EM's D&D Program 2013 Edition U.S. Department Of Energy safety  performance  cleanup  closure M E Environmental Management Environmental Management safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management 3/13/2013 The American Recovery and Reinvestment Act of 2009

150

Overview - Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Help > Data Management Help > Data Management Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Overview Welcome to the data management pages for data providers to the ORNL Distributed Active Archive (DAAC). These pages provide an overview of data management planning and preparation and offer practical methods to successfully share and archive your data. Plan - write a short data management plan while preparing your research proposal, Manage - assign logical, descriptive file names, define the contents of your data files, and use consistent data values when preparing

151

Office of Legacy Management FY 2009 Energy Management Data Report...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Other Agencies You are here Home Office of Legacy Management FY 2009 Energy Management Data Report Office of Legacy Management FY 2009 Energy Management Data...

152

ICT Supply Chain Risk Management  

Science Conference Proceedings (OSTI)

... ICT Supply Chain Risk Management Manager's Forum ... ICT Supply Chain Risk Management National Institute of Standards and Technology Page 6. ...

2013-06-04T23:59:59.000Z

153

Run manager module for CORAL laboratory management  

E-Print Network (OSTI)

This thesis describes a new module, the Run Manager (RM), for Stanford Nanofabrication Facility's Common Object Representation for Advanced Laboratories (CORAL). CORAL is the lab manager with which MIT's Microsystems ...

Klann, Jeffrey G

2004-01-01T23:59:59.000Z

154

Federal Energy Management Program: Best Management Practice:...  

NLE Websites -- All DOE Office Websites (Extended Search)

Single-Pass Cooling Equipment to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Single-Pass Cooling Equipment on Facebook Tweet about Federal...

155

Environmental Management System Plan  

E-Print Network (OSTI)

3) environmental management programs, (4) training, (5)Management Programs3-5 Structure and Responsibility.3-6 Training,Management System Plan Program Elements Additional information regarding EMS training

Fox, Robert

2009-01-01T23:59:59.000Z

156

Federal Energy Management Program: Operations and Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Support to someone by E-mail Management Support to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Management Support on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Management Support on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Google Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Delicious Rank Federal Energy Management Program: Operations and Maintenance Management Support on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Management Support on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

157

Bi[NC{sub 5}H{sub 3}(CO{sub 2}){sub 2}](OH{sub 2}){sub x}F (x=1 and 2): New one-dimensional Bi-coordination materials-Reversible hydration and topotactic decomposition to {alpha}-Bi{sub 2}O{sub 3}  

SciTech Connect

Two one-dimensional bismuth-coordination materials, Bi[NC{sub 5}H{sub 3}(CO{sub 2}){sub 2}](OH{sub 2}){sub x}F (x=1 and 2), have been synthesized by hydrothermal reactions using Bi{sub 2}O{sub 3}, 2,6-NC{sub 5}H{sub 3}(CO{sub 2}H){sub 2}, HF, and water at 180 Degree-Sign C. Structures of the two materials were determined by single-crystal X-ray diffraction. Although they have different crystal structures, both Bi-organic materials shared a common structural motif, a one-dimensional chain structure consisting of Bi{sup 3+} cations and pyridine dicarboxylate linkers. Detailed structural analyses include infrared spectroscopy, thermogravimetric analysis, and reversible hydration reactions for the coordinated water molecules were reported. Also, thermal decomposition of the rod-shaped Bi[NC{sub 5}H{sub 3}(CO{sub 2}){sub 2}](OH{sub 2})F single crystals at 800 Degree-Sign C led to {alpha}-Bi{sub 2}O{sub 3} that maintained the same morphology of the original crystals. - Graphical abstract: Calcination of the Bi[NC{sub 5}H{sub 3}(CO{sub 2}){sub 2}](OH{sub 2})F single crystals at 800 Degree-Sign C results in the {alpha}-Bi{sub 2}O{sub 3} rods that maintain the original morphology of the crystals. Highlights: Black-Right-Pointing-Pointer Synthesis of one-dimensional chain Bi-organic frameworks. Black-Right-Pointing-Pointer Reversible hydration reactions of Bi[NC{sub 5}H{sub 3}(CO{sub 2}){sub 2}](OH{sub 2})F. Black-Right-Pointing-Pointer Topotactic decomposition maintaining the same morphology of the original crystals.

Jeon, Hye Rim [Department of Chemistry Education, Chung-Ang University, Seoul 156-756 (Korea, Republic of); Lee, Dong Woo [Department of Chemistry, Chung-Ang University, Seoul 156-756 (Korea, Republic of); Ok, Kang Min, E-mail: kmok@cau.ac.kr [Department of Chemistry, Chung-Ang University, Seoul 156-756 (Korea, Republic of)

2012-03-15T23:59:59.000Z

158

Energy Star Portfolio Manager  

NLE Websites -- All DOE Office Websites (Extended Search)

May 2013 What's New in Portfolio Manager ? EPA's ENERGY STAR Portfolio Manager tool helps you measure and track energy use, water use, and greenhouse gas emissions of your...

159

Target Cost Management Strategy  

E-Print Network (OSTI)

Target cost management (TCM) is an innovation of Japanese management accounting system and by common sense has been considered with great interest by practitioners. Nowadays, TCM related

Okano, Hiroshi

1996-01-01T23:59:59.000Z

160

FILE MANAGEMENT MANUAL  

NLE Websites -- All DOE Office Websites (Extended Search)

6.5.2 (ZAP BAD POINTERS) : Appendices :1 Glossary of Important File-Management Terms :29 SPIRES Documentation * SPIRES File Management ***...

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011...

162

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

163

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY...

164

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY...

165

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2008 Target FY 2008 Actual...

166

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Final FY...

167

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

168

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 st Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

169

Waterway Management Districts (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

Waterway management districts are established to manage and supervise the use and development of waterways in municipalities with populations between 29,600 and 29,900.

170

K&N Management  

Science Conference Proceedings (OSTI)

... K&N Management (PDF version of this profile). (Photo courtesy of K&N Management). Download high-res version of this photo. ...

2011-04-19T23:59:59.000Z

171

Data Management Policy The  

NLE Websites -- All DOE Office Websites (Extended Search)

Data Management Policy The guidelines below describe Data Management procedures, processes and resources that need to be understood by both user projects and in-house research. 1....

172

Data Management Webinar  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Data Management Best Practices Webinar Environmental Data Management Best Practices Webinar NASA EarthData Webinar Series September 10, 11, and 12, 2013 Abstract The...

173

Stormwater Management Program (Pennsylvania)  

Energy.gov (U.S. Department of Energy (DOE))

Stormwater Management program of the Department of Environmental Protection's Bureau of Conservation and Restoration administers the rules and regulations for stormwater management for Pennsylvania...

174

ALS Project Management Manual  

E-Print Network (OSTI)

management practices across all ALS projects. It describesthat the primary weakness in ALS project management effortsrich projects common at the ALS. It is sometimes difficult

Krupnick, Jim; Harkins, Joe

2000-01-01T23:59:59.000Z

175

Corrective Action Management Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Corrective Action Management Program (CAMP) Home CAMP Background DOE Directives Corrective Action Management Team Corrective Action Tracking System (CATS) CAMP Quarterly Reports...

176

Emergency Management Evaluations - Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Emergency Management Evaluations Reports 2010 Independent Oversight Review of Emergency Management at the Pantex Site Office and Pantex Plant, November 2010 Independent Oversight...

177

PROJECT MANAGEMENT PLANS Project Management Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

178

Federal Energy Management Program: Energy Management Requirements by Law  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Management Energy Management Requirements by Law and Regulation to someone by E-mail Share Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Facebook Tweet about Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Twitter Bookmark Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Google Bookmark Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Delicious Rank Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Digg Find More places to share Federal Energy Management Program: Energy Management Requirements by Law and Regulation on AddThis.com... Requirements by Subject Requirements by Regulation

179

u.s. DEPARThD!NT OF FNFRGY EER E PROJECT MANAG EMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARThD!NT OF FNFRGY DEPARThD!NT OF FNFRGY EER E PROJECT MANAG EMENT CENTER NEPA DFTFR1IllNATION RECIPIENT: North Carolina Central University Page 1 of2 STATE: NC PROJECT TITLE: Production and Characterization of Novel Photovoltaic Materials· A Minority University Research Associates Program at North Carolina Central University Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number elD Number OE·FOA-OOOOO89 DE-EEOOO4003 GFCHlOO4OO3-Q01 EE4003 Based on my review ortbe information concerning the proposed action, as NEPA Compliance Offictr (authorized under DOE Order 4S1.1A),1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 83.6 Siting. construction (or modification), operation, and decommissioning of facilities for indoor bench-scale research

180

u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION PROJECf TITLE: EECBG· 215 W. Cabarrus Street EV charging station Page 1 of2 STATE:NC Funding Opportunity Announcement Number Procunment Instrument Number NEPA Control Number CID Number OE· FOA·0000013 DE-EEOOOO768 GF0-0000768-004 0 Based on my review or the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I bave made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

u.s. DEPARTIvIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETEnllNATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTIvIENT OF ENERGY DEPARTIvIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETEnllNATION RECIPIENT:State of North Carolina - Subrecipient Wilkes County PROJECT TITLE: Greenhouse Gas to Energy Project STATE: NC Funding Opportunity Announcement Number Procurement Instrument Number NEPA Conlrol Number em Number DE-EEOOOO771 0 Based on my review or the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), 1 have made tbe following determination: ex, EA, EIS APPENDIX AND NUMBER: Description : B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor roncentrations of potentially harmful substances. These actions may involve financial and technical

182

U.S. DEPARTl\ffiNT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ffiNT OF ENERGY ffiNT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETER.lVITNATION ® . . * . RECIPIE NT:RTI International STATE: NC PROJECT TITLE: Advanced, Energy-Efficient Hybrid Membrane System for Industrial Water Reuse Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000560 DE-EE0005758 GF0-0005758-001 G05758 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45 1.1 A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Descriptic n: A9 l1formation gatt-ering, analysis, and dissemination Information gathering (including, but not lim1ted to, literature surveys, inventones, s1te visits, and audits), data analysis (including, but not limited to, computer modeling), document preparation

183

Potl,,]) u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Potl,,]) Potl,,]) u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT: North Carolina State University- North Carolina Solar Center PROJECT TITLE: Southem Mid-Atlantic Provider of Solar Instructor Trajning Program Page 1 of2 STATE: NC Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA·()()()()()78 DE-EEOOO5674 GFO-OOO5674-OO1 0 Based on my re"iew ofthe inrormation concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order451.IA).1 have made the following dt'tenninatioD: ex. EA, EIS APPENDIX AND NUMBER: Description: A9 Infonnation gathering, analy sis, and dissemination Informabon gathenng (including, but not limited to, literature surveys, mventories, site VIsits, and audits), data analySis

184

u.s. DEPARTl\IENT OF ENERG Y EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTl\IENT OF ENERG Y DEPARTl\IENT OF ENERG Y EERE PROJECT MANAGEMENT CENTER NEPA DETERlIIINATION Page I of2 STATE: NC PROJECT TITLE: Charlotte Activity 13 - Vehicular Wayfinding and ParkingNariable Messaging Signage ARRA-EECBG Strategy-Only Funding Opportunity Announcement Number DE-FOA-OOOO013 Procurement Instrument Number DE-EE000076S.002 NEPA Control Number CID Number o Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85. 1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

185

. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlvllNATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlvllNATION RECIPIENT;State of North Carolina, Subrecipienl Town of Duck PROJECT TITLE: Town of Duck Town Hall Page 1 of2 STATE: NC Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-EEOOO0771 gfo-oooo771-o18 0 Based on my review of the information CODctJ"Ding tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUM.BER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency thai do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

186

u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CENTE R NEPA DETERJ'.IINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

G *. Ol , G *. Ol , u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CENTE R NEPA DETERJ'.IINATION RECIPIENT:City of Greensboro PROJECT TITLE : 3. Hydroelectric turbine at Water Treatment Plant ARRA-EECBG Strategy-Only Page 10f2 STATE: NC Funding Opportunity Announctment Number Procuremtnt Instrumtnt Number NEPA Control Number CID Number DE-FOA-OOOOO13 DE-EEOOOO767 .002 0 Based on my review oflhe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order4SI.IA), I have made the followinjil determination: ex, EA, EIS APPENDIX AND NUMBER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency thai do nol increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

187

T OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERI\.lINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

e.o!. e.o!. u.s. DEPARTMEN T OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERI\.lINATION RECIPIENT:City of Raleig h PROJECf TITLE: Electric vehicle charging station location #2 ARRA·EECBG Page 1 of2 STATE: NC Funding Opportunity Announcement Numbu Procurtrn t'nC Instrument Number NEPA Control Number C ID Number DE-FOA-OClOOO13 DE-EEOOOO768.001 0 Based on my review or the information concerning the proposed actio n, as NEPA Compliance Officer (authorized under DOE Ordn 451.1A), I bave made the following determination: ex, EA, EIS APPENDIX AND NUM BER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

188

u.s. DEPART""IENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPART""IENT OF ENERGY DEPART""IENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION PROJECT TITLE : EEC8G - 6716 Six Forks Road EV charging station Page 1 of2 STATE: NC Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-0000013 DE-EEOOOO768 GFO-OOOO768-OO3 a Based on my review orlbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order4S1.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

189

Laboratory Management (Quality) Systems  

Science Conference Proceedings (OSTI)

Laboratory Management (Quality) Systems. NISTIR 7028 Type Evaluation Quality Manual Template. This NISTIR has been ...

2012-05-02T23:59:59.000Z

190

ADMINISTRATIVE AND RESOURCE MANAGEMENT  

E-Print Network (OSTI)

development of risk management- relatedITservicesthatbenefittheentireUCsystem. The systems developed at UC and maintenance have diminished so dramatically. #12;7 ADMINISTRATIVE AND RESOURCE MANAGEMENT AnnuAl RepoRt 2010, are collaborating to implement a new asset management, work management, and integrated planning system

Hammock, Bruce D.

191

Environmental Management System Plan  

E-Print Network (OSTI)

offices, the EMS Program Program Elements Environmental ManagementOffice of Institutional Assurance as stated in the OQMP. 3-7 Environmental ManagementEnvironmental Management System Fiscal Year Improve (EMP classification) Integrated Safety Management System International Organization for Standardization Lawrence Berkeley National Laboratory Office

Fox, Robert

2009-01-01T23:59:59.000Z

192

Cryptographic Key Management Workshop 2010  

Science Conference Proceedings (OSTI)

Cryptographic Key Management Workshop 2010. Purpose: ... Related Project(s): Cryptographic Key Management Project. Details: ...

2013-08-01T23:59:59.000Z

193

Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Management System Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Managing our effects on the environment We are committed to protecting the environment while conducting our national security and energy-related missions. Laboratory Environmental Governing Policy What is the Environmental Management System? It covers every program in the Laboratory

194

LPP Risk Management Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

History and Process History and Process Slide 2 M E Environmental Management Environmental Management History ◦ Current Baseline Process Overview ◦ Identification ◦ Simulation ◦ Management Successes & Challenges Slide 3 M E Environmental Management Environmental Management Current Baseline Risks ◦ 1 Week Risk Summit held week of August 4 th , 2008 Broad representation from all levels of Isotek, DOE, PTC, and outside consultants Focused on risk and opportunity identification Included risk description, assumptions, and triggers No quantification or analysis No restrictions, constraints, or filtering HQ provided facilitator Prescribed format and capture methodology Slide 4 M E Environmental Management Environmental Management Current Baseline Risks ◦ Risk Summit Results

195

Office of Resource Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Resource Management Resource Management Home Sub Offices › Business Operations › Information Management › Human Resources and Administration Mission and Functions HSS Standard Operating Practices (For Internal Users Only) HSS Subject Matter Experts and Functional Points of Contacts Contact Us HSS Logo Office of Resource Management Direct Report to the Chief Health, Safety and Security Officer Mission and Functions Mission The Office of Resource Management supports the infrastructure of the Office of Health, Safety and Security (HSS) by providing balanced, unbiased, technically competent, and customer focused services in the areas of: (1) Financial Management, including budget formulation and execution; (2) Procurement Management, including contract and credit card programs; (3) Information Management, including technology-based solutions and programs; (4) Quality Assurance; (5) Human Resources, including recruitment and retention programs; (6) Administrative Services, including property management, travel, and work space management; and; (7) Strategic and Program Planning including performance and efficiency measures.

196

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

Law and Regulation Federal agencies must meet energy management requirements outlined by Federal various statutory laws and regulations. They include: National Energy Conservation...

197

Office of Environmental Management | Department of Energy  

Office of Environmental Management (EM)

Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration Program Management Communication & Engagement...

198

Federal Energy Management Program: Best Management Practice: Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Information and Education Programs to someone by E-mail Information and Education Programs to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Information and Education Programs on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Information and Education Programs on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Information and Education Programs on Google Bookmark Federal Energy Management Program: Best Management Practice: Information and Education Programs on Delicious Rank Federal Energy Management Program: Best Management Practice: Information and Education Programs on Digg Find More places to share Federal Energy Management Program: Best Management Practice: Information and Education Programs on AddThis.com...

199

Federal Energy Management Program: Best Management Practice: Commercial  

NLE Websites -- All DOE Office Websites (Extended Search)

Commercial Kitchen Equipment to someone by E-mail Commercial Kitchen Equipment to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Commercial Kitchen Equipment on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Commercial Kitchen Equipment on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Commercial Kitchen Equipment on Google Bookmark Federal Energy Management Program: Best Management Practice: Commercial Kitchen Equipment on Delicious Rank Federal Energy Management Program: Best Management Practice: Commercial Kitchen Equipment on Digg Find More places to share Federal Energy Management Program: Best Management Practice: Commercial Kitchen Equipment on AddThis.com... Sustainable Buildings & Campuses

200

Federal Energy Management Program: Best Management Practice: Alternate  

NLE Websites -- All DOE Office Websites (Extended Search)

Alternate Water Sources to someone by E-mail Alternate Water Sources to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Alternate Water Sources on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Alternate Water Sources on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Alternate Water Sources on Google Bookmark Federal Energy Management Program: Best Management Practice: Alternate Water Sources on Delicious Rank Federal Energy Management Program: Best Management Practice: Alternate Water Sources on Digg Find More places to share Federal Energy Management Program: Best Management Practice: Alternate Water Sources on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Greenhouse Gases

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Federal Energy Management Program: Bureau of Land Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

Bureau of Land Management - Campground, Utah to someone by E-mail Share Federal Energy Management Program: Bureau of Land Management - Campground, Utah on Facebook Tweet about...

202

Federal Energy Management Program: DOE Enhances Management of...  

NLE Websites -- All DOE Office Websites (Extended Search)

resource Send a link to Federal Energy Management Program: DOE Enhances Management of Energy Savings Performance Contracts to someone by E-mail Share Federal Energy Management...

203

Federal Energy Management Program: Energy Management Guidance  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance Guidance The Federal Energy Management Program (FEMP) provides guidance on Federal laws and regulations related to energy management. General Guidance for Facilities Overview of Federal Energy Management Policy and Mandates: Guidance document outlining Federal energy management goals and requirements for Federal energy managers. Sustainability Requirement Crosswalk: Crosswalk of sustainability and energy goals and targets within executive orders and other statutes. Guidelines Establishing Criteria for Excluding Buildings from the Energy Performance Requirements of Section 543 of the National Energy Conservation Policy Act as Amended by the Energy Policy Act of 2005 (EPAct 2005): Guidelines that established criteria for exclusions from the energy performance requirement for a fiscal year or any Federal building or collection of Federal buildings within the statutory framework provided by the law.

204

Plan - Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Plan Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Plans NASA's Terrestrial Ecology Program now requires that each proposal include a Data Management Plan (DMP) of up to two pages. A DMP for a proposal is a brief document that outlines what you will do with your data during and after your research, to ensure your data will be safe, documented, and accessible now and in the future. A DMP - developed early and used throughout the research project - will increase research efficiency by making the data understandable and usable in the future and

205

Depleted Uranium Hexafluoride Management  

NLE Websites -- All DOE Office Websites (Extended Search)

for for DUF 6 Conversion Project Environmental Impact Statement Scoping Meetings November/December 2001 Overview Depleted Uranium Hexafluoride (DUF 6 ) Management Program DUF 6 EIS Scoping Briefing 2 DUF 6 Management Program Organizational Chart DUF 6 Management Program Organizational Chart EM-10 Policy EM-40 Project Completion EM-20 Integration EM-50 Science and Technology EM-31 Ohio DUF6 Management Program EM-32 Oak Ridge EM-33 Rocky Flats EM-34 Small Sites EM-30 Office of Site Closure Office of Environmental Management EM-1 DUF 6 EIS Scoping Briefing 3 DUF 6 Management Program DUF 6 Management Program * Mission: Safely and efficiently manage the DOE inventory of DUF 6 in a way that protects the health and safety of workers and the public, and protects the environment DUF 6 EIS Scoping Briefing 4 DUF 6 Inventory Distribution

206

LFRG Program Management Plan  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of the EM Low-Level Waste Disposal Facility Federal Review Group Program Management Plan (LFRG PMP) is to establish the LFRG roles and responsibilities, the LFRG management processes,...

207

Power Management Controls  

NLE Websites -- All DOE Office Websites (Extended Search)

additional savings of 1.3 billion are lost because power management is present, but disabled. In some cases, power management is not compatible with the application or doesn't...

208

Coastal Management Act (Georgia)  

Energy.gov (U.S. Department of Energy (DOE))

The Coastal Management Act provides enabling authority for the State to prepare and administer a coastal management program. The Act does not establish new regulations or laws; it is designed to...

209

Chemical Lifecycle Management Cost  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemical Lifecycle Management Cost Presented by: J.M. Hieb, CH2M HILL Plateau Remediation Company CHPRC1204-04 Chemical Lifecycle Management Cost Everyone is trying to stretch a...

210

US CMS Program Management  

NLE Websites -- All DOE Office Websites (Extended Search)

USCMS US CMS Home US CMS @ Work US CMS Research Program Management Joel Butler, US CMS Research Program Manager E-mail: butler@fnal.gov Phone: (630) 840-3148, Fax: (630) 840-2194...

211

Personalized diabetes management  

E-Print Network (OSTI)

In this thesis, we present a system to make personalized lifestyle and health decisions for diabetes management, as well as for general health and diet management. In particular, we address the following components of the ...

O'Hair, Allison Kelly

2013-01-01T23:59:59.000Z

212

Optimizing IT process management  

Science Conference Proceedings (OSTI)

In this paper, the author discusses some key concepts in IT process management. The paper also includes the recommendations in these following aspects: team organization, physical environment, project selection, politics, organizational communication, ... Keywords: IT process management

Tony Tony Lee

2010-07-01T23:59:59.000Z

213

Emergency Management Forum  

NLE Websites -- All DOE Office Websites (Extended Search)

EM Forum The Oak Ridge Emergency Management Forum is sponsored by the U.S. Department of Energy (DOE) Oak Ridge Office (ORO) and Tennessee Emergency Management Agency (TEMA). Each...

214

Energy manager design for microgrids  

E-Print Network (OSTI)

Energy Manager Design for Microgrids Hillier, F. , and G.Energy Manager Design for Microgrids Appendix A: Smart*DER:Manager Design for Microgrids Prepared for the California

Firestone, Ryan; Marnay, Chris

2005-01-01T23:59:59.000Z

215

Use Portfolio Manager | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Use Portfolio Manager Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial...

216

Energy manager design for microgrids  

E-Print Network (OSTI)

to a building energy management system already in place to2003. Microgrid Energy Management System Oak Ridge, TN:better. The term energy management systems (EMS) is widely

Firestone, Ryan; Marnay, Chris

2005-01-01T23:59:59.000Z

217

Meter Data Management  

Science Conference Proceedings (OSTI)

The traditional role of Meter Data Management (MDM) systems has been to acquire and prepare meter data for billing purposes, but these systems have much wider operational value for utilities. Advanced MDM systems could reshape electric power delivery, management, and economics if their cost and complexity could be managed. This White Paper lays out the potential advantages of improved Meter Data Management Systems (MDMS), discusses possible deployment strategies for such systems, and provides a descripti...

2008-07-07T23:59:59.000Z

218

Asset Management Best Practices  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has conducted a series of surveys on the status of the implementation of power delivery asset management and the maintenance of key substation components. The results will assist utilities in determining how to best adapt or adopt the principles of asset management in their organizations. This technical update presents the results of surveys covering organizational and technical aspects of asset management, including detailed questions on the management of pow...

2010-12-23T23:59:59.000Z

219

System and Network Management  

Science Conference Proceedings (OSTI)

This document covers Systems and Network Management Requirements and is the first deliverable in a joint EPRI and Utility User Project to develop Network Management capability for Electric Utility Automation Systems (UAS) using international communication standards such as IEC 61850. The management of substation automation systems is critical since tools are now based, for the most part, on proprietary hardware and software. In modern state-of-the art substations, traditional network management has ...

2012-12-20T23:59:59.000Z

220

Maintenance and Veg Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Functions Infrastructure projects Interconnection OASIS OATT Reauthorization of Transmission Line Permits, Maintenance and Vegetation Management on Forest Service Lands...

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Management Transition Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Records and Information Records and Information Management Transition Guidance November 2013 Records and Information Management Transition Guidance i Records and Information Management Transition Guidance Table of Contents Executive Summary ........................................................................................................................ 1 1.0 Introduction and Purpose ..................................................................................................... 1 LM Records Functions ................................................................................................................ 1 2.0 The Records Life Cycle ....................................................................................................... 2 3.0 Organizational Responsibilities ........................................................................................... 2

222

Towards inclusive identity management  

Science Conference Proceedings (OSTI)

The article argues for a shift of perspective in identity management (IDM) research and development. Accessibility and usability issues affect identity management to such an extent that they demand a reframing and reformulation of basic designs and requirements ... Keywords: Authentication, Disabilities, E-Inclusion, Exclusion, Identity management, Information security, Privacy, Universal design, Usability

Lothar Fritsch; Kristin Skeide Fuglerud; Ivar Solheim

2010-12-01T23:59:59.000Z

223

Radiobiological Laboratory Beaufort, N.C.  

E-Print Network (OSTI)

concentrations were determined from specific radioactivity using calcium or the nucleotide solutions of known stirred gently with a magnetic stirrer for 30 min. Insoluble material was collected by centrifugation (20 of radioactive CaC12(600-1200 cpm/pmol). Fractions of 400 rl were collected at a flow rate of 8 ml/ h. Prior

224

Radioactive Waste Management Basis  

SciTech Connect

The purpose of this Radioactive Waste Management Basis is to describe the systematic approach for planning, executing, and evaluating the management of radioactive waste at LLNL. The implementation of this document will ensure that waste management activities at LLNL are conducted in compliance with the requirements of DOE Order 435.1, Radioactive Waste Management, and the Implementation Guide for DOE Manual 435.1-1, Radioactive Waste Management Manual. Technical justification is provided where methods for meeting the requirements of DOE Order 435.1 deviate from the DOE Manual 435.1-1 and Implementation Guide.

Perkins, B K

2009-06-03T23:59:59.000Z

225

ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF EM Recovery NEWS FLASH RECOVERY.GOV March 10, 2011 American Recovery and Reinvestment Act Payments Surge Past $4 Billion U.S. Depar tment of Energy | Office of Environmental Management For More Information on EM Recovery Act Work, Visit Us on the Web: http://www.em.doe.gov/emrecovery/ FINANCIAL HIGHLIGHTS * More than $4 BILLION in Recovery Act payments are accelerating environmental cleanup * 67% of EM Recovery Act funds have been paid Financial data are based on reporting as of March 9, 2011, and are subject to change. EM has made more than $4 billion in Recovery Act payments, or 32 percent of the DOE's $12.4 billion in Recovery Act payments. DOE received $35.2 billion

226

SHSD Manager Safety Engineering Group Manager  

E-Print Network (OSTI)

Safety, Excavation Safety, Scaffold Safety D. Cubillo: Division Database Programmer J. Durnan: Design. Horn (0.5) ORPS Categorizer S. Moss (Emeritus) S. Kane, Group Manager 9/7/10 Environment, Safety

227

Federal Energy Management Program: Federal Energy Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Management Program Contacts Contact Us By phone: 202-586-5772 By mail: U.S. Department of Energy EE-2L 1000 Independence Ave., S.W. Washington, D.C. 20585-0121 Contact...

228

Integrated Safety Management (ISM)  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Safety Management Integrated Safety Management Home ISM Policy ISM Champions ISM Workshops Resources Archives Contact Us Health and Safety HSS Logo Integrated Safety Management (ISM) ism logo Welcome to the Department of Energy's Office of Health, Safety and Security (HSS) Integrated Safety Management (ISM) Web Site. The Department and its contractors remain firmly committed to ISM as first defined in 1996. The objective of ISM is to perform work in a safe and environmentally sound manner. More specifically, as described in DOE P 450.4, Safety Management System Policy: "The Department and Contractors must systematically integrate safety into management and work practices at all levels so that missions are accomplished while protecting the public, the worker, and the environment. This is to be accomplished through effective integration of safety management into all facets of work planning and execution." "

229

Identity Management Systems Program Homepage  

Science Conference Proceedings (OSTI)

Identity Management Systems Program. ... Identity management systems are responsible for the creation, use, and termination of electronic identities. ...

2010-10-05T23:59:59.000Z

230

Managed Programs, Environmental Protection Division  

NLE Websites -- All DOE Office Websites (Extended Search)

training and supporting subject matter expertise. Environmental Information Management System: storing, managing, verifying, protecting, retrieving and archiving BNL's...

231

Enabling decentralised management through federation  

Science Conference Proceedings (OSTI)

Cross-domain management is an increasingly important concern in network management and such management capability is a key-enabler of many emerging computing environments. This paper analyses the requirements for management systems that aim to support ... Keywords: Federation, Management, Policy-based management, Semantics, Telecommunications

Kevin Feeney; Rob Brennan; John Keeney; Hendrik Thomas; Dave Lewis; Aidan Boran; Declan O'Sullivan

2010-11-01T23:59:59.000Z

232

Development of a Fuel Containing Material Removal and Waste Management Strategy for the Chernobyl Unit 4 Shelter  

Science Conference Proceedings (OSTI)

A study was performed to develop a strategy for the removal of fuel-containing material (FCM) from the Chernobyl Unit 4 Shelter and for the related waste management. This study was performed during Phase 1 of the Shelter Implementation Plan (SIP) and was funded by the Chernobyl Shelter Fund. The main objective for Phase 2 of the SIP is to stabilize the Shelter and to construct a New Confinement (NC) by the year 2007. In addition, the SIP includes studies on the strategy and on the conceptual design implications of the removal of FCM from the Shelter. This is considered essential for the ultimate goal, the transformation of the Shelter into an environmentally safe system.

Tokarevsky, V. V.; Shibetsky, Y. A.; Leister, P.; Davison, W. R.; Follin, J. F.; McNair, J.; Lins, W.; Edler, G.

2002-02-27T23:59:59.000Z

233

Federal Energy Management Program: Federal Energy and Water Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Energy and Federal Energy and Water Management Awards to someone by E-mail Share Federal Energy Management Program: Federal Energy and Water Management Awards on Facebook Tweet about Federal Energy Management Program: Federal Energy and Water Management Awards on Twitter Bookmark Federal Energy Management Program: Federal Energy and Water Management Awards on Google Bookmark Federal Energy Management Program: Federal Energy and Water Management Awards on Delicious Rank Federal Energy Management Program: Federal Energy and Water Management Awards on Digg Find More places to share Federal Energy Management Program: Federal Energy and Water Management Awards on AddThis.com... Project Assistance Training Outreach Awards for Saving Energy Federal Energy and Water Management Better Buildings Federal Award

234

Federal Energy Management Program: Interagency Energy Management Task Force  

NLE Websites -- All DOE Office Websites (Extended Search)

About the Program About the Program Site Map Printable Version Share this resource Send a link to Federal Energy Management Program: Interagency Energy Management Task Force Members to someone by E-mail Share Federal Energy Management Program: Interagency Energy Management Task Force Members on Facebook Tweet about Federal Energy Management Program: Interagency Energy Management Task Force Members on Twitter Bookmark Federal Energy Management Program: Interagency Energy Management Task Force Members on Google Bookmark Federal Energy Management Program: Interagency Energy Management Task Force Members on Delicious Rank Federal Energy Management Program: Interagency Energy Management Task Force Members on Digg Find More places to share Federal Energy Management Program: Interagency Energy Management Task Force Members on AddThis.com...

235

Program Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Management Program Management Safety The Office of Environmental Management's (EM) top priority is to ensure proper implementation and continuous improvement of Integrated Safety Management Systems (ISMS) in the EM complex and to serve as a focal point for EM safety standards and policy development and interpretation and interfaces with internal/external oversight organizations Read more Acquisition The Office of Environmental Management strives to assure effective project, acquisition, and contract management, by working closely with senior level officials in Headquarters and Field Managers; external stakeholders; and major contractors for the purpose of achieving acquisition and project management objectives of the Office of Environmental Management (EM)

236

Business System Management Review  

NLE Websites -- All DOE Office Websites (Extended Search)

P-004 Business System Management Review Process 11_0304Page 1 of 7 P-004 Business System Management Review Process 11_0304Page 1 of 7 EOTA - Business Process Document Title: Business System Management Review Process Document Number: P-004 Rev 11_0304 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): F-009, Business System Management Review Template P-004 Business System Management Review Process 11_0304Page 2 of 7 Revision History: Rev. Description of Change A Initial Release 08_0414 Corrective Actions, Preventive Actions, and Improvement Opportunity 09_1124 Edited document for clarity and to better fit the process in use. Added requirement to provide management with

237

Premises Energy Management  

Science Conference Proceedings (OSTI)

Premises energy management describes the automated management of electric appliances. The objective of the premises energy management system (PEMS) is to provide a value-added service to the PEMS owner and a single interface for the utility through which aggregated grid services can be supplied. This report provides two contributions to existing research: a functional requirement literature review and a simulated PEMS performance analysis.

2011-11-09T23:59:59.000Z

238

Depleted Uranium Hexafluoride Management  

NLE Websites -- All DOE Office Websites (Extended Search)

OFFICE OF DEPLETED URANIUM HEXAFLUORIDE MANAGEMENT Issuance Of Final Report On Preconceptual Designs For Depleted Uranium Hexafluoride Conversion Plants The Department of Energy...

239

EMERGENCY MANAGEMENT (EM)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT (EM) MANAGEMENT (EM) OBJECTIVE EM.1 A routine drill program and emergency operations drill program, including program records, have,been established and implemented. (Core Requirement 11) Criteria 1. Emergency preparedness drills and exercises are conducted and an adequate response capability,exists. 2. Routine operations drills and exercises are conducted and an adequate response capability exists. 3. Applicable emergency management documentation (e.g., Building Emergency Plan, emergency,response procedures, Emergency Preparedness Hazards Assessment, alarm response procedures,,and emergency response procedures) has been updated to reflect implementation of the TA-55 . Approach Record Reviews: Review the emergency management documents (e.g., Building

240

Federal Identity Management Handbook  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Identity Management Handbook Federal Identity Management Handbook Version 0.1 December 2005 VERSION 0.1 Federal Identity Management Handbook Acknowledgements The Office of Management and Budget and the Federal Identity Credentialing Committee would like to acknowledge the significant contributions of the National Institute of Standards and Technology (NIST) and the Government Smart Card Interagency Advisory Board (IAB) for providing valuable contributions to the development of this handbook. A special thanks goes out to those who participated in the various workshops and provided valuable subject matter expertise and lessons learned. The comments received from other government and industry organizations are also acknowledged. VERSION 0.1 i

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Numerical Simulation Management  

Science Conference Proceedings (OSTI)

... API. A high level API is required for customizing the management process when the SMT requirements do not meet the researcher's needs. ...

2013-07-19T23:59:59.000Z

242

Management Information Reporting Procedures  

Science Conference Proceedings (OSTI)

... but are not limited to assistance in developing environmental management systems, improving ... with a client that is already in the database, there is ...

2010-07-01T23:59:59.000Z

243

THE PRESIDENT'S MANAGEMENT AGENDA  

NLE Websites -- All DOE Office Websites (Extended Search)

For example, * Workforce planning and restructuring undertaken as part of Strategic Management of Human Capital will be defined in terms of each agency's mission, goals, and...

244

Environmental Management Commission (Alabama)  

Energy.gov (U.S. Department of Energy (DOE))

The Alabama Department of Environmental Management is charged with developing the state's environmental policy, hearing administrative appeals of permits, administrative orders and variances issued...

245

Group key management  

SciTech Connect

This report describes an architecture and implementation for doing group key management over a data communications network. The architecture describes a protocol for establishing a shared encryption key among an authenticated and authorized collection of network entities. Group access requires one or more authorization certificates. The implementation includes a simple public key and certificate infrastructure. Multicast is used for some of the key management messages. An application programming interface multiplexes key management and user application messages. An implementation using the new IP security protocols is postulated. The architecture is compared with other group key management proposals, and the performance and the limitations of the implementation are described.

Dunigan, T.; Cao, C.

1997-08-01T23:59:59.000Z

246

Revolutionizing Software Asset Management  

Science Conference Proceedings (OSTI)

... Security Automation Minimize Risk Page 3. ... Update Software Distribution/ Management ... 4 Test Devices One system has base OS + MSIE 8.0 ...

2012-11-02T23:59:59.000Z

247

Nuclear Waste Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Waste Management's Yucca Mountain Project and the Office of Nuclear Energy's Advanced Fuel Cycle Initiative (AFCI) and Global Nuclear Energy Partnership (GNEP) programs. Efforts...

248

Crypto Key Management Framework  

Science Conference Proceedings (OSTI)

... responsible to executive-level management (eg, the Chief Information Officer) for the ... entity information, keys, and metadata into a database used by ...

2013-08-15T23:59:59.000Z

249

Energy Management - TMS  

Science Conference Proceedings (OSTI)

TMS 2011: Lunchtime Session: Energy Management: Things Your Mother Didn't Teach You February 27 - March 3, 2011 San Diego, California. Anyone...

250

Efficient Water Use & Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Sustainability Goals Water Use Goal 4: Efficient Water Use & Management Aware of the arid climate of northern New Mexico, water reduction and conservation remains a primary...

251

E M Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E M Environmental Management safety performance cleanup closure EM RECOVERY ACT TOP LINE MESSAGES * The Department estimates the 6 billion Recovery Act investment has allowed us...

252

Energy Management Systems  

E-Print Network (OSTI)

This presentation will address results from a pilot project with 10 chemical plants on energy management systems and the development of an energy efficiency plant certification program.

Ferland, K.

2007-01-01T23:59:59.000Z

253

GO MANAGERS OFFICE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

starch 12122007 15:50 303275497* GO MANAGERS OFFICE PAGE 0306 * * processing and dry corn fractionation and has developed numerous proprietary technologies in the field of...

254

Integrated waste management.  

E-Print Network (OSTI)

??Integrated waste management is considered from a systems approach, with a particular emphasis on advancing sustainability. The focus of the thesis is to examine the (more)

Seadon, Jeffrey Keith

2010-01-01T23:59:59.000Z

255

b. FINANCIAL MANAGEMENT POLICY  

Science Conference Proceedings (OSTI)

The TMS Financial Management Policy establishes the methods and guidelines by which the .... INVESTMENT POLICIES AND PROCEDURES. 5.1 The...

256

Office of Quality Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Data. To meet these missions, the Office of Quality Management: Develops and revises DOE Regulations and Orders concerning Restricted Data, Formerly Restricted Data,...

257

Stormwater Management Act (Pennsylvania)  

Energy.gov (U.S. Department of Energy (DOE))

The policy and purpose of this act is to encourage planning and management of storm water runoff in each watershed consistent with sound water and land use practices.

258

Training Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Beam Time ESAF Contacts Calendars User Community Scientific Access Site AccessVisit Training Training Management System Argonne system used to track training requirements and...

259

Mixed Waste Management Guidelines  

Science Conference Proceedings (OSTI)

The management of mixed waste presents serious challenges to nuclear utilities. Regulatory and practical predicaments make compliance with the letter of all applicable regulations extremely difficult. Utility experts developed these guidelines to identify opportunities for improving work practices and regulatory compliance while minimizing any potential adverse impacts of mixed waste management.

1994-12-31T23:59:59.000Z

260

EPRI Tritium Management Model  

Science Conference Proceedings (OSTI)

While tritium generated by nuclear power plants has insignificant dose impacts to the public, its management can be a significant issue in terms of public relations and perception. This document provides a tool for nuclear power plant decision makers to assess their operating strategies for tritium management.

2005-11-10T23:59:59.000Z

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Managing UX teams  

Science Conference Proceedings (OSTI)

This SIG will serve two purposes: as a forum to share the results from the two-day CHI workshop, and also as a forum for the management community to discuss topics of interest. Keywords: design, management, method, organizations, practice, research, technique, user experience

Janice Rohn; Dennis Wixon; Jim Nieters; Carola Thompson

2011-05-01T23:59:59.000Z

262

Lawn Water Management  

E-Print Network (OSTI)

Water is a limited resource in Texas. This booklet explains how homeowners can establish a water management program for a home lawn that both maintains a healthy sod and also conserves water. The publication discusses soil types, grass varieties, management practices and watering techniques.

McAfee, James

2006-06-26T23:59:59.000Z

263

Sustainable warehouse management  

Science Conference Proceedings (OSTI)

Sustainable warehouse is about integrating, balancing and managing the economic, environmental and social inputs and outputs of the warehouse operations. Sustainability is a core value to many businesses but they find it hard to implement in their current ... Keywords: sustainability modelling, sustainable warehouse management, system dynamics

Kah-Shien Tan; M. Daud Ahmed; David Sundaram

2009-06-01T23:59:59.000Z

264

Substation Stormwater Management  

Science Conference Proceedings (OSTI)

Electric substations have unique considerations in stormwater management due to the presence of high voltage lines and fluids that create contaminant concerns. In response to the changing regulatory climate, Electric Power Research Institute (EPRI) members identified a need to assess and develop stormwater management strategies to control discharges from electric substation construction sites.BackgroundStormwater regulation is becoming more stringent across ...

2013-11-21T23:59:59.000Z

265

Risk Management RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Risk Management Review Module Risk Management Review Module March 2010 CD-0 O 0 OFFICE OF C CD-1 F ENVIRO Standard R Risk M Rev Critical Decis CD-2 M ONMENTAL Review Plan Managem view Module sion (CD) Ap CD March 2010 L MANAGE (SRP) ment e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008, Integration of Safety into the Design Process, and EM's internal

266

Office of Legacy Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1.7, 2010 December 1.7, 2010 MEMORANDUM FOR DAVID W. GEISER, DIRECTOR, DOE-LM- 1 FROM: TRACY A. RIBEIRO, ENVIRONMENTAL PROGRAM MANAGER, DOE-LM , f , ,,, Tracy R i b e ~ r o n / / 2010.1 2 17 08:47:34 -07'00' SUBJECT: Approval of FY 201 1 EMS Goals and Initiatives In accordance with the requirements of the DOE-LM Environmental Management System Description, the highlighted EMS goals and initiatives for FY 201 1 are enclosed for your formal approval. The EMS goals and initiatives align with DOE Order 450.1 A, Environmental Protection Program; DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management; the Transformational Energy Action Management (TEAM) Initiative, Executive Order 13423, Strengthening Federal Environmental, Energy and Transportation Management,

267

Terrestrial Carbon Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Terrestrial Carbon Management Data Sets and Analyses Terrestrial Carbon Management Data Sets and Analyses Carbon Accumulation with Cropland Management Influence of Agricultural Management on Soil Organic Carbon: A Compendium and Assessment of Canadian Studies (VandenBygaart et al., Agriculture and Agri-Food Canada) Soil Carbon Sequestration by Tillage and Crop Rotation: A Global Data Analysis (West and Post, Oak Ridge National Laboratory) Preliminary Estimates of the Potential for Carbon Mitigation in European Soils Through No-Till Farming (Smith et al., University of Aberdeen, United Kingdom) Potential for Carbon Sequestration in European Soils: Preliminary Estimates for Five Scenarios Using Results from Long-Term Experiments (Smith et al., University of Aberdeen, United Kingdom) Carbon Accumulation with Grassland Management

268

Federal Energy Management Program: Best Management Practice: Laboratory and  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory and Medical Equipment to someone by E-mail Laboratory and Medical Equipment to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Laboratory and Medical Equipment on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Laboratory and Medical Equipment on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Laboratory and Medical Equipment on Google Bookmark Federal Energy Management Program: Best Management Practice: Laboratory and Medical Equipment on Delicious Rank Federal Energy Management Program: Best Management Practice: Laboratory and Medical Equipment on Digg Find More places to share Federal Energy Management Program: Best Management Practice: Laboratory and Medical Equipment on AddThis.com... Sustainable Buildings & Campuses

269

Federal Energy Management Program: Best Management Practice: Toilets and  

NLE Websites -- All DOE Office Websites (Extended Search)

Toilets and Urinals to someone by E-mail Toilets and Urinals to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Toilets and Urinals on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Toilets and Urinals on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Toilets and Urinals on Google Bookmark Federal Energy Management Program: Best Management Practice: Toilets and Urinals on Delicious Rank Federal Energy Management Program: Best Management Practice: Toilets and Urinals on Digg Find More places to share Federal Energy Management Program: Best Management Practice: Toilets and Urinals on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Greenhouse Gases Water Efficiency Basics

270

Best Management Practice: Water Management Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Best Management Practice: Water Management Planning Best Management Practice: Water Management Planning Best Management Practice: Water Management Planning October 7, 2013 - 3:03pm Addthis A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans. Water management plans should provide clear information about how a facility uses water from the time it is piped in to its ultimate disposal. Knowing how water is used and what it costs enables Federal agencies to make appropriate water management decisions. Overview Federal facility water management plans should include the following: Water Use Policy Statement and Goals Senior management should indicate support for water efficiency in a material way. This can be done in two ways:

271

Records Management POC Responsibilities | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

RespbsforHQPOCSREDESIGN.pdf More Documents & Publications POINT OF CONTACT RESPONSIBILITIES FOR RECORDS MANAGEMENT Records Management Handbook Records Management Handbook...

272

Information and Records Management Transition Guidance | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information and Records Management Transition Guidance Information and Records Management Transition Guidance Information and Records Management Transition Guidance (March 2004)...

273

Automated Transportation Management System (ATMS) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Management Packaging and Transportation Automated Transportation Management System (ATMS) Automated Transportation Management System (ATMS) The Department of Energy's...

274

Appendix 8 - iManage Change Management Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Date: Robert Regan CHRISePerformance Project Manager Signature: Date: Matthew Sparks STRIPES Project Manager Signature: Date: Distribution This document has been distributed to:...

275

Federal Energy Management Program: DOE Enhances Management of...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Renewable Energy Federal Energy Management Program DOE Enhances Management of Energy Savings Performance Contracts U.S. Department of Energy (DOE) Assistant Secretary...

276

Site Management Guide | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here Home Site Management Guide Site Management Guide Site Management Guide (Blue Book) (Revision 14, December 2012) Site Management Guide More Documents & Publications...

277

Risk Management Process Overview | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cybersecurity Risk Management Process Risk Management Process Overview Risk Management Process Overview figure depicting three tier risk management process The cybersecurity...

278

College of Environmental Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management College of Environmental Management College of Environmental Management Mission The College of Environmental Management (CEM) mission is to provide EM...

279

Procurement and Property Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Doing Business with... Doing Business with... Brookhaven National Laboratory (BNL) Procurement and Property Management provides customers with timely, cost-effective procurement and property management services integrated with and supporting the Laboratory's science, technology and cleanup missions in accordance with the prime contract and customer expectations. Services Include: Procurement of high quality supplies and services that meet customer requirements, Identification and control of government property, Maintaining an efficient stores operation, Expeditious shipping, receiving and delivery services. PPM Has Moved! We are located at: 44 Ramsey Road Shirley, NY 11967 Directions Procurement Property Management Purchasing System Approval (pdf) Personal Property Approval (pdf)

280

Risk Management Tool Attributes:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Tools & SMEs - Tools & SMEs Outline for Breakout Session TOOLS 1. Types of Tools a. Risk Management - Database & Reports, risk register, risk forms, risk tracking & monitoring, basis of estimate, action item tracking, historical record of risks & changes, configuration control, enterprise-wide, metrics, risk performance index, risk checklist, graphical display, management reporting (various levels), risk communications b. Risk Analysis i. Cost, ii. budgets, funding, cash-flow analysis, iii. Schedule iv. tailoring categories v. Integrated Cost & Schedule vi. Project phase analysis; organization ownership & joint planning c. Risk Knowledge and Lessons Learned Database i. Enterprise-wide ii. Job/owner-specific iii. Workshops - project specific, risk management,

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Performance Management Plan  

SciTech Connect

This Performance Management Plan describes the approach for accelerating cleanup activities of U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Management (EM) Program. This approach accelerates the reduction of risk at NNSA/NV sites while performing the work responsibly, effectively, and more efficiently. In May 2002, NNSA/NV EM and the Nevada Division of Environmental Protection signed a Letter of Intent formalizing an agreement to pursue accelerated risk reduction and cleanup for activities within the State of Nevada. This Performance Management Plan provides the strategic direction for implementing the Letter of Intent.

IT Corporation, Las Vegas, NV

2002-08-21T23:59:59.000Z

282

Federal Energy Management Program: Best Management Practice: Distribution  

NLE Websites -- All DOE Office Websites (Extended Search)

Distribution System Audits, Leak Detection, and Repair to someone Distribution System Audits, Leak Detection, and Repair to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Distribution System Audits, Leak Detection, and Repair on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Distribution System Audits, Leak Detection, and Repair on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Distribution System Audits, Leak Detection, and Repair on Google Bookmark Federal Energy Management Program: Best Management Practice: Distribution System Audits, Leak Detection, and Repair on Delicious Rank Federal Energy Management Program: Best Management Practice: Distribution System Audits, Leak Detection, and Repair on Digg Find More places to share Federal Energy Management Program: Best

283

Federal Energy Management Program: Metering  

NLE Websites -- All DOE Office Websites (Extended Search)

Metering to Metering to someone by E-mail Share Federal Energy Management Program: Metering on Facebook Tweet about Federal Energy Management Program: Metering on Twitter Bookmark Federal Energy Management Program: Metering on Google Bookmark Federal Energy Management Program: Metering on Delicious Rank Federal Energy Management Program: Metering on Digg Find More places to share Federal Energy Management Program: Metering on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Systems Approaches Process Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources Contacts Greenhouse Gases Water Efficiency Data Center Energy Efficiency Industrial Facilities

284

DOE Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Environmental Management Project and Contract Management Improvement Timeline Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. The DOE Office of Environmental Management (EM) has put in place a "Roadmap" for Journey to Excellence that sets specific performance expectations for continuous improvements in contract and project management. Following are some highlights of EM's improvement actions over the past five years. In 2006, the National Academy of Public Administration (NAPA) began a study of EM, which included acquisition and project management among its key focus areas. The resultant report from the study,

285

Cryptographic Key Management Workshop 2012  

Science Conference Proceedings (OSTI)

Cryptographic Key Management Workshop 2012. Purpose: NIST is conducting a two-day Key Management Workshop on September 10-11. ...

2013-08-01T23:59:59.000Z

286

Vencon Management | Open Energy Information  

Open Energy Info (EERE)

| Sign Up Search Page Edit with form History Facebook icon Twitter icon Vencon Management Jump to: navigation, search Name Vencon Management Place United States Sector...

287

Email in personal information management  

Science Conference Proceedings (OSTI)

Email's conduit function means the inbox, folders, search, and sort are used to support core PIM functions of task management, personal archiving, and contact management.

Steve Whittaker; Victoria Bellotti; Jacek Gwizdka

2006-01-01T23:59:59.000Z

288

Drilling Waste Management Technology Descriptions  

NLE Websites -- All DOE Office Websites (Extended Search)

skip navigation Drilling Waste Management Information System: The information resource for better management of drilling wastes DWM Logo Search Search you are in this section...

289

NIM (NERSC Information Management) system  

NLE Websites -- All DOE Office Websites (Extended Search)

NERSC Information Management (NIM) portal The NERSC Information Management (NIM) system is a web portal used to view and modify user account, usage, and allocations information....

290

Engage upper management | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify...

291

Federal Energy Management Program: Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

that about 10% of this is used to heat Details Bookmark & Share View Related Federal Energy Management Program Overview - Facilitating Sound, Cost-Effective Energy Management...

292

Industrial energy management | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify...

293

Federal Energy Management Program: Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies Site Map Printable Version Share this resource Send a link to Federal Energy Management Program: Technologies to someone by E-mail Share Federal Energy Management...

294

Federal Energy Management Program: Outreach  

NLE Websites -- All DOE Office Websites (Extended Search)

Outreach to someone by E-mail Share Federal Energy Management Program: Outreach on Facebook Tweet about Federal Energy Management Program: Outreach on Twitter Bookmark Federal...

295

Jennifer Caldwell Senior Commercialization Manager  

NLE Websites -- All DOE Office Websites (Extended Search)

Caldwell, 865-574-4180, caldwelljt@ornl.gov Jennifer Caldwell Senior Commercialization Manager Jennifer Caldwell is a Senior Commercialization Manager for the Partnerships...

296

Federal Energy Management Program: Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning to someone by E-mail Share Federal Energy Management Program: Commissioning on Facebook Tweet about Federal Energy Management Program: Commissioning on Twitter...

297

Management Excellence by Sandra Waisley  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

cleanup closure E M Environmental Management 2 EM Journey to Excellence Roadmap DOE Strategic Plan (2011) (Goal: Management and Operational Excellence) Performance Agreement...

298

Drilling Waste Management Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

The Drilling Waste Management Information System is an online resource for technical and regulatory information on practices for managing drilling muds and cuttings, including...

299

Managing Radiation Emergencies: Prehospital Guidance  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance for Prehospital Emergency Services Guidance for Hospital Medical Management Procedure Demonstration How do you manage emergencies? Guidance for Prehospital Emergency...

300

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Final FY 2012 Pre- & Post-CAP Final Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 86% Construction 87% Cleanup 84% 77% Pre-CAP 89% Post-CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 4th Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 100% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Government Energy Management  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy's Federal Energy Management Program (FEMP) plays a critical role in reducing energy use and increasing the use of renewable energy at federal agencies. The U.S....

302

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 87% Construction 87% Cleanup 87% 77% Pre-CAP 90% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 3rd Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 98% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

303

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 84% Construction 83% Cleanup 85% 77% Pre-CAP 86% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 1st Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 94% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

304

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 88% Construction 87% Cleanup 89% 77% Pre-CAP 92% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost. Contract/Project Management Performance Metrics FY 2012 Target FY 2012 2nd Qtr Actual Comment Certified EVM Systems: Post CD-3, (greater than $20 million). 95%* 96% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects

305

Supplier Selection Management Process  

NLE Websites -- All DOE Office Websites (Extended Search)

ADMP-002 Vendor Selection and Management Process 11_0203 1 of 9 ADMP-002 Vendor Selection and Management Process 11_0203 1 of 9 EOTA - Business Process Document Title: Vendor Selection and Management Process Document Number: ADMP-002 Rev. 11_0203 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): ADMF-009 Vendor Audit Plan, ADMF-010 Vendor Audit Checklist, ADMF-011 Vendor Audit Report, ADMF-015 Vendor Evaluation Record, ADMP-001 Procurement Process, ADMF-016 EOTA Vendor List, REG-003 Record Register ADMP-002 Vendor Selection and Management Process 11_0203 2 of 9 Revision History: Rev. Description of Change A Initial Release 08_1110 Added verbiage and reference for ADMF-016, EOTA Vendor List to process.

306

Integrating Management Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Mission Execution by Mission Execution by Integrating our Management Systems Integrating our Management Systems 1 W e e k l y O p e r a t i o n s M e e t i n g N o v e m b e r 1 , 2 0 1 1 M i c h a e l J . W e i s Pulling the Pieces Together for Improving DOE Management to Enable Mission Execution 2  Process changes Process changes  Behavioral changes Behavioral changes  System changes System changes Process Change Approach Strengthening and Expediting Decision Making 3 Proposed Outcomes Horizontal Integration Incoming DOE Business Crosscutting Issues (i.e. NLDC input) Hi-level Roadblocks Operations Management Council Associate Deputy Secretary Collaborative Action Process Chief Operating Officer Weekly Operations Council (OMC) Super 8 Secretary (ADS) (CAP) Board (COOB) p Meeting Endorsement / Commitment Super 8 US Meetings COO Meetings

307

Safety Management System Policy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY POLICY Washington, D.C. Approved: 4-25-11 SUBJECT: INTEGRATED SAFETY MANAGEMENT POLICY PURPOSE AND SCOPE To establish the Department of Energy's (DOE) expectation for safety, 1 including integrated safety management that will enable the Department's mission goals to be accomplished efficiently while ensuring safe operations at all departmental facilities and activities. This Policy cancels and supersedes DOE Policy (P) 411.1, Safety Management Functions, Responsibilities, and Authorities Policy, dated 1-28-97; DOE P 441.1, DOE Radiological Health and Safety Policy, dated 4-26-96; DOE P 450.2A, Identifying, Implementing and Complying with Environment, Safety and Health Requirements, dated 5-15-96; DOE P 450.4, Safety Management

308

Transportation Management Workshop: Proceedings  

Science Conference Proceedings (OSTI)

This report is a compilation of discussions presented at the Transportation Management Workshop held in Gaithersburg, Maryland. Topics include waste packaging, personnel training, robotics, transportation routing, certification, containers, and waste classification.

Not Available

1993-10-01T23:59:59.000Z

309

COMPREHENSIVE LEGACY MANAGEMENT  

Office of Legacy Management (LM)

Revision 7.0 Final This page intentionally left blank LMSFERS03496-7.0 Comprehensive Legacy Management and Institutional Controls Plan Volumes I and II Fernald Preserve Fernald,...

310

BNL Environmental Management Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

Surface Projects Brookhaven Graphite Research Reactor High Flux Beam Reactor Waste Management Division OU IV Five-Year Review The five-year review of the Operable Unit IV...

311

Uranium Management and Policy  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Uranium Management and Policy (NE-54), as part of the Office of Fuel Cycle Technologies (NE-5), supports the Department of Energy (DOE) by assuring domestic supplies of fuel for...

312

Manage Software Testing  

Science Conference Proceedings (OSTI)

Covering all aspects of test management, this book guides you through the business and organizational issues that you are confronted with on a daily basis, and explains what you need to focus on strategically, tactically, and operationally.

Peter Farrell-Vinay

2007-07-01T23:59:59.000Z

313

Management Control Cover  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fees in the Idaho National Laboratory Contract OAS-M-06-07 August 2006 REPORT ON MANAGEMENT CONTROLS OVER PERFORMANCE FEES IN THE IDAHO NATIONAL LABORATORY CONTRACT TABLE OF...

314

External > Programs > Environmental Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Haul Road Environmental Management The Oak Ridge Reservation is one of the U.S. Department of Energy's (DOE) most unique and complex sites, encompassing three major campuses and...

315

Integrated XML Document Management  

Science Conference Proceedings (OSTI)

XML has become a widely accepted data format for exchange and representation of semi-structured data. Efficiently managing XML as well as traditional business documents and content in an integrated fashion is a necessity for companies to be successful ...

Hui-I Hsiao; Joshua Hui; Ning Li; Parag Tijare

2003-01-01T23:59:59.000Z

316

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects:...

317

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90%...

318

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCACAP)...

319

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCACAP)...

320

ISSUES MANAGEMENT PROGRAM MANUAL  

E-Print Network (OSTI)

ISSUES MANAGEMENT PROGRAM MANUAL LBNL/PUB-5519 (1), Rev. 0and Analysis Program Manual. LBNL/PUB-5519 (1), Rev. 0the Regulations and Procedures Manual (RPM): CATS database o

Gravois, Melanie

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Waste Management Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Waste Management Facility ISO 14001 Registered A wide range of wastes are generated during the normal course of business at BNL. These waste streams are common to many businesses...

322

Environmental Management System Plan  

E-Print Network (OSTI)

Protection Program, DOE Order 450.1A (June 4, 3. DOE Oand Health Reporting, DOE Order 231.1A (1995, as amended).Emergency Management System, DOE Order 151.1B (October 29,

Fox, Robert

2009-01-01T23:59:59.000Z

323

Lithium battery management system  

SciTech Connect

Provided is a system for managing a lithium battery system having a plurality of cells. The battery system comprises a variable-resistance element electrically connected to a cell and located proximate a portion of the cell; and a device for determining, utilizing the variable-resistance element, whether the temperature of the cell has exceeded a predetermined threshold. A method of managing the temperature of a lithium battery system is also included.

Dougherty, Thomas J. (Waukesha, WI)

2012-05-08T23:59:59.000Z

324

Environmental information management plan  

Science Conference Proceedings (OSTI)

The Environmental Information Management Plan provides an overview of the management of environmental information generation by Hanford Site programs. The long-term nature of environmental programs requires that electronic data, documents, and other materials be kept for extended periods in a secure, controlled, and retrievable manner. An important part of the program is the maintenance of administrative records under the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989). The Environmental Information Management Plan introduces Westinghouse Hanford records management and engineering document control systems and their relationship to environmental programs. Specific information is provided about the operation of the Environmental Data Management Center, a central facility that receives, processes, and maintains information related to environmental program activities. The Environmental Data Management Center maintains a reference file, coordinates administrative record activities, and distributes administrative record indexes and administrative record documents to the US Environmental Protection Agency, the US Department of Energy, the Washington State Department of Ecology, and four information repositories. 43 refs., 16 figs., 5 tabs.

Michael, L.E.; Main, G.C.; See, E.J.

1990-03-01T23:59:59.000Z

325

Data Management Tools  

SciTech Connect

What is data management (DM) and why is it important? As described in the ''Handbook of Data Management'' (Thuraisingham, 1998), data management is the process of understanding the data needs of an organization and making the data available to support the operations of the organization. The ultimate goal of data management is to provide the seamless access and fusion of massive amounts of data, information, and knowledge in a heterogeneous and real-time environment, and to support the functions and decision making processes of an organization. The important questions that need to be asked for proper data management are: who is going to be using the data, what types of data need to be stored, and how will this data be accessed? With these questions answered, the data management system (DMS) can then be created, or an existing system can be modified to meet the needs of the organization. The real importance of a data management system is to provide the end user with a consistent data set of known quality. The elements of a good data management system should include a system that: is modeled to how the data is collected and processed, is very well documented, has specifically defined data elements, and has supporting data documentation. Supporting documentation includes items like quality control (QC) data that is carried with the analytical data, and meta data (information about the data). Supporting documentation can be anything that is useful to the project and that needs to be accessed with the data. Data sets get better the more they are used. As errors and inconsistencies are identified and corrected, the data set improves. A good DMS will achieve this because its design promotes use, and the ultimate value of data is in its use rather than its storage. The development and use of Internet access tools, and existing environmental data management systems, can help reduce the effort and cost associated with setting up a DMS. This presentation will discuss the qualities of a good data management system and provide examples.

Ridley, M; Stoker, C

2001-02-12T23:59:59.000Z

326

National reconstruction information management system  

Science Conference Proceedings (OSTI)

National Reconstruction Information Management System (NARIMS) is a revolutionary concept designed and developed by the National Reconstruction Bureau, Government of Pakistan, to work as an aid in support of the Local Governments under the Devolution ... Keywords: administration, asset management, community development, decision support, e-governance, financial, geographical information system, human resource management, information management system, local government, monitoring, performance evaluation

Daniyal Aziz; Syed Adnan Shah; Deeba Gilani

2007-12-01T23:59:59.000Z

327

Thermal Management of Solar Cells  

E-Print Network (OSTI)

UNIVERSITY OF CALIFORNIA RIVERSIDE Thermal Management ofUniversity of California, Riverside Acknowledgments First, I

Saadah, Mohammed Ahmed

2013-01-01T23:59:59.000Z

328

Enterprise level IT risk management  

Science Conference Proceedings (OSTI)

Increasing IT budget and over-dependence of business on IT infra-structure makes risk management a critical component of enterprise management. The creation and sustenance of an IT risk management framework is one of the crucial and challenging tasks ... Keywords: enterprise level, information technology, risk management

Nadhirah Azizi; Khairuddin Hashim

2008-11-01T23:59:59.000Z

329

Biometrics Identity Management Agency Laboratory  

Science Conference Proceedings (OSTI)

Biometrics Identity Management Agency Laboratory. NVLAP Lab Code: 200933-0. Address and Contact Information: 1000 ...

2013-08-09T23:59:59.000Z

330

FACULTY OF SCIENCE FACULTY MANAGER  

E-Print Network (OSTI)

Lesley Barry EARTH SCIENCES School Manager Jane Coles GEOGRAPHICAL SCIENCES School Manager Jane Coles Manager Kev Williams BRISTOL CENTRE FOR NANOSCIENCE AND QUANTUM INFORMATION Centre Manager Fred Hale Executive support Senior Executive A ssistant Mary Mussett Administrative Assistant Liz Wainwright Executive

Bristol, University of

331

NIST Office of Financial Resource Management  

Science Conference Proceedings (OSTI)

NIST Office of Financial Resource Management. Divisions. Budget Division; Finance Division; Business Systems Division; Acquisition Management ...

2012-01-11T23:59:59.000Z

332

Automating Personalized Battery Management on Smartphones  

E-Print Network (OSTI)

3 Automating Battery Management . . . . . . .122 Battery Goal Setting UI . . . . . . . . . . . . . . .Power and Battery Management . . . . . . . . . . . . . . .

Falaki, Mohamamd Hossein

2012-01-01T23:59:59.000Z

333

Federal Computer Security Program Managers' Forum (Forum ...  

Science Conference Proceedings (OSTI)

Federal Computer Security Program Managers' Forum. Summary: The Federal Computer Security Program Managers' Forum ...

2013-01-15T23:59:59.000Z

334

Property Management | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Management Property Management Personal Property Management and Accountability for Headquarters Management Personal property management includes all functions necessary for the proper determination of need, source, acquisition, receipt, accountability, utilization, maintenance, rehabilitation, storage, distribution and disposal of property. Authorized Property Representatives Effective October 2, 2013: Authorized Property Pass Signers List and Accountable Property Representatives List Personal Property Guidance Personal property management requires a lifecycle approach to be effective. There are four major phases in the personal property lifecycle: acquisition, receipt, utilization, and disposal. Each phase has distinct processes and procedures associated with it to maintain proper stewardship

335

Records Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Management Records Management The Department of Energy (DOE) Records Management Program ensures compliance with the Federal Records Act of 1950, as amended, by promoting the management of records throughout their life cycle in an economical, efficient and effective manner. Implementation of a sound Records Management Program facilitates decision-makers and others having the right information in support of mission accomplishment; and the creation and maintenance of records to protect the rights and interests of the Department and those we serve. The Records Management Program is also responsible for the Department's Information Collection Program, and the Information Quality Program. The Information Collection Program is responsible for implementing the

336

Records Management | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Management Records Management The Department of Energy (DOE) Records Management Program ensures compliance with the Federal Records Act of 1950, as amended, by promoting the management of records throughout their life cycle in an economical, efficient and effective manner. Implementation of a sound Records Management Program facilitates decision-makers and others having the right information in support of mission accomplishment; and the creation and maintenance of records to protect the rights and interests of the Department and those we serve. The Records Management Program is also responsible for the Department's Information Collection Program, and the Information Quality Program. The Information Collection Program is responsible for implementing the

337

Management Information Systems (MIS) Sample Occupations  

E-Print Network (OSTI)

Support Specialist Computer and Information Systems Manager Computer Training Specialist Consultant Data Recruiter Knowledge Manager Logistics Manager Management Analysis MIS Director/Specialist Network Securities & Exchange Commission Website Design Companies Wholesale & Retail Companies Operations Manager

Ronquist, Fredrik

338

About CRSP Management Center  

NLE Websites -- All DOE Office Websites (Extended Search)

CRSP Act Power Projects Contact CRSP Customers Environmental Review-NEPA Financial Data Operations Planning & Projects Power Marketing Rates CRSP Act Power Projects Contact CRSP Customers Environmental Review-NEPA Financial Data Operations Planning & Projects Power Marketing Rates About Colorado River Storage Project Management Center CRSP Management Center Office The Ak-Chin Indian Community in Arizona, the city of Aspen, Colo., and Kirtland Air Force Base in New Mexico are a few of the vital customers of the Colorado River Storage Project's Management Center. We assist customers in saving their valuable electrical resources by actively promoting energy management and conservation programs and helping them determine their future energy needs. When customers want new products and services tailored to their individual needs, we explore their ideas. We are also committed to protecting the delicate balance of the Colorado River and its tributaries. Agencies that manage this river's resources must weigh its many roles: irrigation, recreation, hydropower and native and non-native endangered species habitat protection. Balancing these resources with the needs of water and electrical energy customers is a chief concern.

339

Procurement and Property Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Traffic Management Services Plum Island Constructed 1827 Traffic Management Services Plum Island Constructed 1827 Shipping and Receiving Supervisor: M. White Phone: 631-344-2300 Email: mwhite@bnl.gov Traffic Management Services include the following: Transportation Services. Provide guidance on methods of shipment, carrier availability, and discount programs for moving freight for the account of the U. S. Government. Employee Relocation Program. Coordinate the movement of household goods for BNL employees. Receipt and Inspection of goods. Provide the services necessary to ensure that goods are received, inspected, and delivered on time. Ensure that damages are noted at time of delivery and establish claims as necessary. Import/Export Services. Provide guidance on the requirements for shipments made by the Laboratory to destinations outside the continental United States. Obtain Export Licenses as needed.

340

Safety & Emergency Management  

NLE Websites -- All DOE Office Websites (Extended Search)

F.A.Q.s F.A.Q.s Conference Center and APS Site Activity Coordination Management and/or Coordination of APS Site Work/Services Safety & Emergency Management Database Maintenance Personnel Safety & Emergency Management Area Emergency Supervision Drills/Training Page Bob Whitman with any questions or concerns. Area Emergency Supervisors and Building Monitors in your location can be found online. ESH 108 Building Orientation Page Bob Whitman with any questions regarding the newly designed ESH 108 Building Orientation course. Fire Alarm System Testing Through Argonne Fire Protection Services, the fire alarm system is tested visually and audibly annually. Life Safety Inspections Page Carl Nelson at 4-1892 with any questions. Life Safety Inspections are collected by Carl via fax at 2-9729 or delivery to office B0149

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Nuclear Safety Management  

NLE Websites -- All DOE Office Websites (Extended Search)

[6450-01-P] [6450-01-P] DEPARTMENT OF ENERGY 10 CFR Part 830 Nuclear Safety Management AGENCY: Department of Energy (DOE). ACTION: Final Rule. SUMMARY: The Department of Energy (DOE) is issuing a final rule regarding Nuclear Safety Management. This Part establishes requirements for the safe management of DOE contractor and subcontractor work at the Department's nuclear facilities. Today's rule adopts the sections that will make up the generally applicable provisions for Part 830. It also adopts the specific section on provisions for developing and implementing a formalized quality assurance program. EFFECTIVE DATE: This regulation becomes effective [insert 30 days after publication in the Federal Register.] FOR FURTHER INFORMATION CONTACT: Frank Hawkins, U.S. Department of Energy, Nuclear Safety

342

PETSc: Docs: Code Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Code Management Code Management Home Download Features Documentation Manual pages and Users Manual Citing PETSc Tutorials Installation SAWs Changes Bug Reporting Code Management FAQ License Linear Solver Table Applications/Publications Miscellaneous External Software Developers Site In this file we list some of the techniques that may be used to increase one's efficiency when developing PETSc application codes. We have learned to use these techniques ourselves, and they have improved our efficiency tremendously. Editing and Compiling The biggest time sink in code development is generally the cycle of EDIT-COMPILE-LINK-RUN. We often see users working in a single window with a cycle such as: Edit a file with emacs. Exit emacs. Run make and see some error messages. Start emacs and try to fix the errors; often starting emacs hides

343

RMOTC - Testing - Carbon Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Management Carbon Management Ten Sleep Time Structure, 2nd Wall Creek Formation at RMOTC Notice: As of July 15th 2013, the Department of Energy announced the intent to sell Naval Petroleum Reserve Number 3 (NPR3). The sale of NPR-3 will also include the sale of all equipment and materials onsite. A decision has been made by the Department of Energy to complete testing at RMOTC by July 1st, 2014. RMOTC will complete testing in the coming year with the currently scheduled testing partners. For more information on the sale of NPR-3 and sale of RMOTC equipment and materials please join our mailing list here. RMOTC has the field setting, infrastructure, and expertise to play an important role in carbon management testing, demonstration, and research. The unique combination of a publicly-owned and DOE-operated oil field,

344

Computer memory management system  

DOE Patents (OSTI)

A computer memory management system utilizing a memory structure system of "intelligent" pointers in which information related to the use status of the memory structure is designed into the pointer. Through this pointer system, The present invention provides essentially automatic memory management (often referred to as garbage collection) by allowing relationships between objects to have definite memory management behavior by use of coding protocol which describes when relationships should be maintained and when the relationships should be broken. In one aspect, the present invention system allows automatic breaking of strong links to facilitate object garbage collection, coupled with relationship adjectives which define deletion of associated objects. In another aspect, The present invention includes simple-to-use infinite undo/redo functionality in that it has the capability, through a simple function call, to undo all of the changes made to a data model since the previous `valid state` was noted.

Kirk, III, Whitson John (Greenwood, MO)

2002-01-01T23:59:59.000Z

345

Load-management decision  

Science Conference Proceedings (OSTI)

Utilities require baseload, intermediate, and peaking plants to meet fluctuating customer demand. These can be supplemented with off-peak generation and storage and load management, which can take the form of direct utility control over interruptible and deferrable customers or customer incentives that require off-peak demand. Utilities should make a careful analysis of their load profile, their generation mix, their ability to shift loads, and customer attitudes before deciding on a load-management program that fits their individual needs. They should also be aware that load management is only a limited resource with a number of uncertainties. Research programs into customer relations, system reliability, communications devices, and special control switches and meters will help to relieve some of the uncertainties. (DCK)

Lihach, N.; Gupta, P.

1982-05-01T23:59:59.000Z

346

Western Veg Management EA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment for the Environmental Assessment for the Glen Canyon to Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project within the Coconino National Forest November 2011 Glen Canyon-Pinnacle Peak 345 kV Transmission Lines EPG Vegetation Management Project Draft EA i November 2011 TABLE OF CONTENTS 1 Section 1 - Purpose and Need for Action .................................................................................... 1-1 2 1.1 Introduction and Background ........................................................................... 1-1 3 1.2 Purpose and Need for Action ............................................................................ 1-3 4 1.3 Location and project Area Description ............................................................. 1-3 5

347

Management Control Cover  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assess- Assess- ing Natural Resource Damage at Rocky Flats OAS-M-06-02 November 2005 REPORT ON MANAGEMENT CONTROLS OVER ASSESSING NATURAL RESUORCE DAMAGE AT ROCKY FLATS TABLE OF CONTENTS Natural Resource Damage Assessment at Rocky Flats Details of Finding 1 Recommendation and Comments 3 Appendices Objective, Scope, and Methodology 5 Prior Audit Reports 6 Management Comments 7 NATURAL RESURCE DAMAGE ASSESSMENT AT ROCKY FLATS Page 1 Details of Finding Natural Resource The Rocky Flats Project Office (Project Office) had not initiated, Damage Assessment and had no plans, at the time of our review, for conducting a Natural Resource Damage Assessment (NRDA) at the Rocky Flats

348

Senior Technical Safety Manager  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Program Technical Program Manager Qualification Standard DOE-STD-1178-2004 May 2013 Reference Guide The Functional Area Qualification Standard References Guides are developed to assist operators, maintenance personnel, and the technical staff in the acquisition of technical competence and qualification within the Technical Qualification Program. Please direct your questions or comments related to this document to the Office of Leadership and Career Manager, Technical Qualification Program (TQP), Albuquerque Complex. This page is intentionally blank. Table of Contents i FIGURES ....................................................................................................................................... ii TABLES ......................................................................................................................................... ii

349

Records Management: a manual  

SciTech Connect

Records Management provides a Records Depository service that enables an office to get rid of semi-active and inactive records. Cleaning out files makes it possible to manage active records more efficiently and find the files when they are needed. Records Depository will also store essential records on Blue Label tapes that must be preserved in case of disaster to Sandia National Laboratories at Albuquerque or Livermore. Step-by-step instructions make the procedure of storing, retrieving, and destroying records a simple matter.

Blair, T.L.

1985-03-01T23:59:59.000Z

350

Performance Management Methodology Moving from Performance Measurement to Performance Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guide to a Balanced Scorecard: Guide to a Balanced Scorecard: Performance Management Methodology Moving from Performance Measurement to Performance Management Guide to a Balanced Scorecard Performance Management Methodology Richard H. Hopf Deputy Assistant Secretary for Procurement and Assistance Management Department of Energy Lloyd W. Pratsch Procurement Executive Department of State Robert A. Welch Director for Acquisition Management and Procurement Executive Department of Commerce Pauk A. Denett Director of Administration/Senior Procurement Executive Department of Interior David J. Litman Director, Office of Acquisition and Grants Management Department of Transportation Ida M. Ustad Deputy Associate Administrator for Acquisition Policy General Services Administration Terrence J. Tychan Deputy Assistant Secretary for Grants

351

Federal Energy Management Program: News  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT FUNDING PROJECT FUNDING TECHNOLOGIES SERVICES NEWS & EVENTS EERE » Federal Energy Management Program » News & Events Site Map Printable Version Share this resource Send a link to Federal Energy Management Program: News to someone by E-mail Share Federal Energy Management Program: News on Facebook Tweet about Federal Energy Management Program: News on Twitter Bookmark Federal Energy Management Program: News on Google Bookmark Federal Energy Management Program: News on Delicious Rank Federal Energy Management Program: News on Digg Find More places to share Federal Energy Management Program: News on AddThis.com... News Events News Subscribe to RSS News Feed RSS Feed icon January 13, 2014 FEMP Offers New Advanced eTraining on UESCs The U.S. Department of Energy (DOE) Federal Energy Management Program

352

Assessment of Project Management Experience  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of Project Management Experience PMCDP for CEG Competency 1.12.2 Assessment of Project Management Experience PMCDP for CEG Competency 1.12.2 Applicant Name: Applicant Supervisor: Date (mm/dd/yyyy): Directions: Step 1: Use this template to show project management experience for CEG competency 1.12.2. Rate your experience (0 - 5) in the following project management related activities using the scale below. Step 2: Sign the completed form and have your supervisor review and sign it. Step 3: Once approved by your supervisor, submit the form as part of your Level I certification package. Note: Project management experience is distinguished from FPD experience and applies to general project management activities and experience. Positions that do not count towards experience in project management include: program manager, property manager, health, safety and security (HSS) positions, and

353

Project Management Resources | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Project Management Resources Project Management Resources Performance & Project Completion Environmental Management Completed Projects 2005-Present EM Current Project Performance Office of Engineering and Construction Management (OECM) Monthly Project Dashboard Project Management Resources DOE Office of Environmental Management Project & Contract Management Improvement Timeline Project Management Approach Using Earned Value Management Root Cause Analysis and Corrective Actions Plan DOE Order 413.3B DOE Directives OMB Capital Programming Guide OECM Project Management Career Development Program OECM Project Management Policy and Guidance per Office of Management Project Definition Rating Index (PDRI) Project Management Institute (PMI) Construction Industry Institute (CII)

354

Stage Management & Technology  

E-Print Network (OSTI)

Stage managers provide centralized communication, organization, and task coordination for all individuals in the production team. This study explores the advantages and disadvantages of different and new forms of technology implemented into various facets of theatrical production and the provisions of the stage manager outlined above. Technology will be compared to traditional methods to determine the differences in the efficiency of communication and documentation. The purpose of this study is to determine if universal, user-friendly technologies are capable of achieving the desired tasks of the stage manager by reaching multiple points of reference. Three different forms of technology are utilized as tools to assess their efficiency: social networking, VirtualCallboard, and the iPad. These tools are employed to analyze communication across the production team. The intention is to eliminate the need for paper documentation and duplication while increasing the effectiveness of communication. These findings will determine which segments and systems of the research are universally applicable. They will also suggest which technologies are a practical approach for assisting with the tasks and responsibilities of the stage manager. Analysis of this research will establish if these sources provide a reasonable advantage in a theatrical setting and if they are dependable enough to use in place of traditional methods.

O'Brien, Madison D

2013-05-01T23:59:59.000Z

355

Lighting management casebook  

SciTech Connect

Fifteen examples illustrate how lighting system projects can save energy as well as improve productivity and safety. The case histories include the use of programmable lighting, fiber optics, skylights, voltage reduction, ultrasonic and infrared sensors, and other strategies for improving lighting efficiency. Each case history includes the management approach, site information, and applications. (DCK)

1982-06-01T23:59:59.000Z

356

Software management issues  

SciTech Connect

The difficulty of managing the software in large HEP collaborations appears to becoming progressively worst with each new generation of detector. If one were to extrapolate to the SSC, it will become a major problem. This paper explores the possible causes of the difficulty and makes suggestions on what corrective actions should be taken.

Kunz, P.F.

1990-06-01T23:59:59.000Z

357

Comprehensive Environmental Management Process  

SciTech Connect

This report contains information about Los Alamos National Laboratory`s Comprehensive Environmental Management Plan. The topics covered include: waste minimization, waste generation, environmental concerns, public relations of the laboratory, and how this plan will help to answer to the demands of the laboratory as their mission changes.

Hjeresen, D.L.; Roybal, S.L.

1994-08-01T23:59:59.000Z

358

UNIVERSITY OF FINANCIAL MANAGEMENT  

E-Print Network (OSTI)

UNIVERSITY OF HAWAI`I FINANCIAL MANAGEMENT INFORMATION SYSTEMS (FMIS) ON-LINE QUICK REFERENCE GUIDE Reference Guide FIXED ASSETS SYSTEM (FFX) Scrn Num Screen Name 502 Asset Maintenance Use this screen-2093 Fixed Assets System (FFX), Inventory Maintenance - transfer, disposal of equipment, decal, equipment

359

Transportation Demand Management Plan  

E-Print Network (OSTI)

Transportation Demand Management Plan FALL 2009 #12;T r a n s p o r t a t i o n D e m a n d M a n the transportation impacts the expanded enrollment will have. Purpose and Goal The primary goal of the TDM plan is to ensure that adequate measures are undertaken and maintained to minimize the transportation impacts

360

Purge water management system  

DOE Patents (OSTI)

A purge water management system for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

Cardoso-Neto, Joao E. (North Augusta, SC); Williams, Daniel W. (Aiken, SC)

1996-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Purge water management system  

DOE Patents (OSTI)

A purge water management system is described for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

Cardoso-Neto, J.E.; Williams, D.W.

1995-01-01T23:59:59.000Z

362

8 Management Plan Introduction  

E-Print Network (OSTI)

in the subbasin to mitigate and protect resources affected by the construction and operation of the Federal ratepayer funds to construct or improve existing infrastructure, to acquire land or protective easements geographic scope are: · Unknown management strategies for the Hanford Reach Monument, because the U.S. Fish

363

Hazardous Waste Management Training  

E-Print Network (OSTI)

Hazardous Waste Management Training Persons (including faculty, staff and students) working be thoroughly familiar with waste handling and emergency procedures ap- plicable to their job responsibilities before handling hazardous waste. Departments are re- quired to keep records of training for as long

Dai, Pengcheng

364

Monitoring informs management  

SciTech Connect

Improved regional monitoring and reporting of greenhouse-gas emissions depends on accurate estimates of emissions from different land-use regimes. An analysis suggests that measuring emissions per crop yield may be an optimum metric for refining land-management decisions.

West, Tristram O.

2011-10-24T23:59:59.000Z

365

Senior Director Project Management  

E-Print Network (OSTI)

(IG-13-003, November 15, 2012) The Office of Inspector General contracted with the independent public with the Government Accountability Office's Government Auditing Standards and the Office of Management and Budget section of NASA's FY 2012 Agency Financial Report for the Inspector General's transmittal letter and Pw

Ginzel, Matthew

366

OFFICE FOR EMERGENCY MANAGEMENT  

Office of Legacy Management (LM)

OFFICE FOR EMERGENCY MANAGEMENT 155OP STREETNW. WiSHINGTON. D.C. ' , iQns 25,19&L At-t :. I' .' at l530 P Btmat, IO&, XtwMn&m, 0. 6., at 9130 A.Jb Sa 1 llmbemupoftbaaomlttaal8f...

367

Quality Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Management Quality Management Quality Management The Office of Quality Management, within the Office of Health, Safety and Security develops policies and procedures to ensure the classification and control of information is effective and consistent. The Office of Quality Management also assists other Government agencies to meet the requirements contained in DOE-issued regulations concerning Restricted Data and Formerly Restricted Data. To meet these missions, the Office of Quality Management: Develops and revises DOE Regulations and Orders concerning Restricted Data, Formerly Restricted Data, Transclassified Foreign Nuclear Information, National Security Information, Unclassified Controlled Nuclear Information, and Official Use Only Responds to Mandatory Declassification Review Requests under

368

Energy Management and Sustainability Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

Management and Sustainability Policy Management and Sustainability Policy USAA Real Estate Company has a reputation for excellence in customer service and taking a leadership role in the real estate industry. As part of our commitment to excellence, we will identify and implement improved financial and operation efficiencies, particularly in how we purchase and use energy, striving toward world-class status in energy management and sustainability. Commitment to Energy & Sustainability Management Energy Management and Sustainability will continually play a role in achieving our strategic objectives. Specifically, the USAA Real Estate Company Energy Management and Sustainability Strategy is to: Support the organization's strategic plan to maximize ownership value and provide customers and

369

Managing projects utilizing self-managed teams and managerial toolkits  

E-Print Network (OSTI)

Project Management is an essential function in most software companies today. With increasing complexity and inter connectivity between software projects, it is not surprising that managing such large scale development ...

Mathur, Praveen, S. M. Massachusetts Institute of Technology

2009-01-01T23:59:59.000Z

370

Manager's Desk Reference on Human Capital Management Flexibilities |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manager's Desk Reference on Human Capital Management Flexibilities Manager's Desk Reference on Human Capital Management Flexibilities Manager's Desk Reference on Human Capital Management Flexibilities The purpose of this document is to provide DOE managers and supervisors with information on available flexibilities that can be used in day-to-day human capital management activities, especially those bearing on the recruitment and retention of high-quality staff. Each section of the document includes a basic description of a particular tool as well as Frequently Asked Questions related to how to best use it in a given set of circumstances or in combination with other flexibilities, unless they are available elsewhere, in which the web link is listed under References for that section. At the end of each section are references with web links that

371

Project Management Plan (PMP) for Work Management Implementation  

SciTech Connect

The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

SHIPLER, C.E.

2000-01-13T23:59:59.000Z

372

POINT OF CONTACT RESPONSIBILITIES FOR RECORDS MANAGEMENT | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

OF CONTACT RESPONSIBILITIES FOR RECORDS MANAGEMENT More Documents & Publications Records Management POC Responsibilities Records Management Handbook Records Management Handbook...

373

Industrial Energy Management and Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management and Standards Industrial Energy Management and Standards Industrial Energy Management and Standards Industrial Energy Management and Standards More Documents &...

374

Process Management Maturity Assessment Process Management Maturity Assessment  

E-Print Network (OSTI)

This paper outlines a Business Process Management implementation approach in a large international company. It introduces a Process Management Maturity Assessment (PMMA) which was developed to assess the implementation of Business Process Management. The maturity model is based on the assessment of nine categories which comprehensively cover all aspects which impact the success of Business Process Management. Some findings of the first assessment round are presented to illustrate the benefits of the PMMA approach.

Michael Rohloff; Michael Rohloff

2009-01-01T23:59:59.000Z

375

DOE Jobs Online (Hiring Manager), Office of Human Capitol Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Human Capitol Management Innovation and Solutions More Documents & Publications MOX Services Unclassified Information System PIA, National Nuclear Services Administration...

376

Fifth Power Delivery Asset Management Conference  

Science Conference Proceedings (OSTI)

The Electric Power Research (EPRI) Asset Management Conference is part of EPRI's Power Delivery Asset Management program. The Asset Management Conference helps members manage their corporate culture by incorporating asset management best practices and aligning organizational processes around asset management goals. This report details EPRI's fifth Power Delivery Asset Management (PDAM) Conference.

2011-11-29T23:59:59.000Z

377

Life Cycle Management of Chemicals: Conceptual Design for Information Management  

Science Conference Proceedings (OSTI)

Tracking the acquisition, use, and disposition of chemicals allows companies to reduce costs; manage risks to health, safety, and the environment; and improve compliance and reporting efficiency. This report provides a means of identifying and evaluating chemical life cycle information management needs. The conceptual design presented here will guide utilities through development of a custom system for managing chemical life cycle data.

1999-08-10T23:59:59.000Z

378

Agile management - an oxymoron?: who needs managers anyway?  

Science Conference Proceedings (OSTI)

"Self-directed team" is one of the mantras of Agile Methodologies. Self-direction means that the team's manager is relegated to a facilitator role with little or no influence over day-to-day activities. For example, Kent Beck has written that the manager ... Keywords: agile methodologies, management best practices

Lougie Anderson; Glen B. Alleman; Kent Beck; Joe Blotner; Ward Cunningham; Mary Poppendieck; Rebecca Wirfs-Brock

2003-10-01T23:59:59.000Z

379

Waste Management & Research290 Waste Manage Res 2002: 20: 290301  

E-Print Network (OSTI)

Waste Management & Research290 Waste Manage Res 2002: 20: 290­301 Printed in UK ­ all rights reserved Copyright © ISWA 2002 Waste Management & Research ISSN 0734­242X Introduction Chromated copper of sorting technologies for CCA treated wood waste Monika Blassino Helena Solo-Gabriele University of Miami

Florida, University of

380

Waste Management & Research172 Waste Manage Res 2003: 21: 172177  

E-Print Network (OSTI)

Waste Management & Research172 Waste Manage Res 2003: 21: 172­177 Printed in UK ­ all rights reserved Copyright © ISWA 2003 Waste Management & Research ISSN 0734­242X In many market segments of PVC in Germany increased by 9%, the fastest growth rate of all plastics. The waste stream in Germany

Columbia University

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

PADS FY 2010 Annual Reports FY 2010 Obligations to Facilities Management Contracts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

C4N - SHELTERED WORKSHOP 1 831,263 C4N - SHELTERED WORKSHOP 1 831,263 C0L - LOCAL GOVT/MUNICIPALITY 2 125,000 B22 - LARGE BUSINESS 979 2,388,060,659 C3N - NON-PROFIT ORGANIZATION 24 282,357,286 I0E - EDUCATIONAL INSTITUTION 9 4,970,555 A00 - SMALL BUSINESS 1,890 1,921,241,548 C0F - FEDERAL GOVERNMENT 478 388,669,688 E1N - FOREIGN CONTRACTOR 1 -16,921,324 8 UNIQUE VALUES 3,384 4,969,334,675 Geographic Distribution of FY 2010 Obligations to Non-Facilities Management Awards STATE NUMBER OF AWARDS FY 2010 OBLIGATIONS NORTH DAKOTA (ND) 28 2,832,957 ILLINOIS (IL) 68 25,598,750 ARIZONA (AZ) 96 8,732,671 WISCONSIN (WI) 6 831,049 GEORGIA (GA) 34 5,300,948 NORTH CAROLINA (NC) 17 10,995,700 RHODE ISLAND (RI) 2 660,000 DISTRICT OF COLUMBIA (DC) 770 524,559,400 PENNSYLVANIA (PA) 132 84,970,982

382

Revenue management: models and methods  

Science Conference Proceedings (OSTI)

Revenue management is the collection of strategies and tactics firms use to scientifically manage demand for their products and services. The practice has grown from its origins in airlines to its status today as a mainstream business practice ...

Kalyan T. Talluri; Garrett J. van Ryzin; Itir Z. Karaesmen; Gustavo J. Vulcano

2009-12-01T23:59:59.000Z

383

Towards Manageable Mobile Agent Infrastructures  

Science Conference Proceedings (OSTI)

This paper addresses the problem of managing distributed mobile agent infrastructures. First, the weaknesses of current mobile agent implementations will be discussed and identified from the manageability viewpoint. The solutions devised and experimented ...

Paulo Simes; Paulo Marques; Lus Moura Silva; Joo Gabriel Silva; Fernando Boavida

2001-07-01T23:59:59.000Z

384

Solid Waste Management Program (Missouri)  

Energy.gov (U.S. Department of Energy (DOE))

The Solid Waste Management Program in the Department of Natural Resources regulates the management of solid waste in the state of Missouri. A permit is required prior to the construction or...

385

Data Management Group Annual Report  

E-Print Network (OSTI)

iv Data Management Group Annual Report 2003 City of Hamilton City of Toronto GO Transit Regional of York Toronto Transit Commission The Data Management Group is a research program located ........................................................................................................ 3 Text-based Data Retrieval System `drs

Toronto, University of

386

Data Management Group Annual Report  

E-Print Network (OSTI)

Data Management Group Annual Report 2001 prepared by: Data Management Group Joint Program..............................................................................2 Text Based Data Retrieval System `drs' ..........................................................2 Internet Browser Data Retrieval System (iDRS)..............................................3 Complex Data

Toronto, University of

387

Data Management Group Annual Report  

E-Print Network (OSTI)

Data Management Group Annual Report 1999 prepared by: Data Management Group Joint Program................................................................. 1 INFORMATION PROCESSING ............................................. 2 Text Based Data Retrieval System `drs' ........................ 2 Internet Browser Data Retrieval System (iDRS) ............ 3

Toronto, University of

388

Federal Energy Management Program: News  

NLE Websites -- All DOE Office Websites (Extended Search)

News & Events Site Map Printable Version Share this resource Send a link to Federal Energy Management Program: News to someone by E-mail Share Federal Energy Management Program:...

389

Data Management at the ALS  

NLE Websites -- All DOE Office Websites (Extended Search)

Data Management at the ALS Print Users of the ALS are responsible for meeting their data management obligations to their home institutions and granting agencies. The ALS does not...

390

BladeCenter chassis management  

Science Conference Proceedings (OSTI)

The IBM eServerTM BladeCenter system allows compute, network, and storage components to operate under a common chassis management scheme. It offers a new approach to solving many systems management issues surrounding the integration ...

T. Brey; B. E. Bigelow; J. E. Bolan; H. Cheselka; Z. Dayar; J. M. Franke; D. E. Johnson; R. N. Kantesaria; E. J. Klodnicki; S. Kochar; S. M. Lardinois; C. A. Morrell; M. S. Rollins; R. R. Wolford; D. R. Woodham

2005-11-01T23:59:59.000Z

391

Security Services Management (Section B)  

Science Conference Proceedings (OSTI)

To take the next step in information security, Security Services Management provides a comprehensive approach to managing people, process, and technology through the sound application of metrics. This book demonstrates how to develop a balanced strategy ...

James S. Tiller

2007-07-01T23:59:59.000Z

392

Emergency Animal Management during Disasters  

E-Print Network (OSTI)

This publication explains how communities and counties can incorporate animal issues into their emergency management plans. It explains what local plans should include, what role county Extension agents can play, and how animal management plans can best be used.

Dement, Angela

2006-10-23T23:59:59.000Z

393

Where do firms manage earnings?  

E-Print Network (OSTI)

Despite decades of research on how, why, and when companies manage earnings, there is a paucity of evidence about the geographic location of earnings management within multinational firms. In this study, we examine where ...

Dyreng, Scott D.

394

Enter data into Portfolio Manager | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Enter data into Portfolio Manager Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction...

395

Solar International Management Inc | Open Energy Information  

Open Energy Info (EERE)

Solar International Management Inc Jump to: navigation, search Name Solar International Management Inc Place Washington,DC, Washington, DC Zip 20006 Sector Solar Product Manager of...

396

Environmental Management Root Cause Analysis Corrective Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

397

OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

398

Office of Environmental Management (EM) Organization Chart |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

399

Federal Energy Management Program: Federal Interagency Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

Meetings to someone by E-mail Share Federal Energy Management Program: Federal Interagency Energy Management Task Force Meetings on Facebook Tweet about Federal Energy Management...

400

Legacy Management Sites | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Legacy Management Sites Legacy Management Sites Alaska Puerto Rico Continental US Click on a site for more information. The Energy Department is committed to managing its...

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

NERSC Data Management Strategy and Policies  

NLE Websites -- All DOE Office Websites (Extended Search)

Data Management Policies NERSC Data Management Strategy and Policies Introduction NERSC provides its users with the means to store, manage, and share their research data products....

402

Information Management Governance Council | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Information Management Governance Council Information Management Governance Council Describes the establishment of the Information Management Governance Council and What They Do....

403

Build an energy management program | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Build an energy management program Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction...

404

Transportation and Program Management Services | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Program Management Services Transportation and Program Management Services Overview of Secured Transportation Services (STS) Transportation and Program Management Services More...

405

NETL: Produced Water Management Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

PWMIS Home Produced Water Management Information System The Produced Water Management Information System is an online resource for technical and regulatory information for managing...

406

Manage energy use in manufacturing | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Manage energy use in manufacturing Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction...

407

DOE - Office of Legacy Management -- GJD  

Office of Legacy Management (LM)

for custody and long-term management of the site transferred to DOE's Office of Legacy Management in 2003. Management responsibilities include routine inspection and...

408

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Program Management to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Management on Facebook Tweet about...

409

Office of Acquisition and Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

support on D&D activities, sustainabilityenergy management, and real property asset management across the EM complex. The office manages the transfer of excess contaminated...

410

Emergency Management Limited Scope Performance Test Inspectors...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management Oversight (HS-63) Emergency Management Limited Scope Performance Test Inspectors Guide March 2008 Emergency Management Performance Test Inspectors Guide...

411

RFI Comments - Digital Management Inc.  

Science Conference Proceedings (OSTI)

... Lessons from energy, oil, gas, or any large manufacturing industry ... Enterprise Encryption Key and Digital Certificate Management Market Outlook. ...

2013-04-08T23:59:59.000Z

412

Categorical Exclusion Determinations: Environmental Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consolidated Business Service Center Categorical Exclusion Determinations: Environmental Management Consolidated Business Service Center Categorical Exclusion Determinations issued...

413

Energy manager design for microgrids  

E-Print Network (OSTI)

refrigeration, space heating, water heating, and loads that can only be met by combustible Energy Manager Design

Firestone, Ryan; Marnay, Chris

2005-01-01T23:59:59.000Z

414

Managed Pressure Drilling Candidate Selection  

E-Print Network (OSTI)

Managed Pressure Drilling now at the pinnacle of the 'Oil Well Drilling' evolution tree, has itself been coined in 2003. It is an umbrella term for a few new drilling techniques and some preexisting drilling techniques, all of them aiming to solve several drilling problems, including non-productive time and/or drilling flat time issues. These techniques, now sub-classifications of Managed Pressure Drilling, are referred to as 'Variations' and 'Methods' of Managed Pressure Drilling. Although using Managed Pressure Drilling for drilling wells has several benefits, not all wells that seem a potential candidate for Managed Pressure Drilling, need Managed Pressure Drilling. The drilling industry has numerous simulators and software models to perform drilling hydraulics calculations and simulations. Most of them are designed for conventional well hydraulics, while some can perform Underbalanced Drilling calculations, and a select few can perform Managed Pressure Drilling calculations. Most of the few available Managed Pressure Drilling models are modified Underbalanced Drilling versions that fit Managed Pressure Drilling needs. However, none of them focus on Managed Pressure Drilling and its candidate selection alone. An 'Managed Pressure Drilling Candidate Selection Model and software' that can act as a preliminary screen to determine the utility of Managed Pressure Drilling for potential candidate wells are developed as a part of this research dissertation. The model and a flow diagram identify the key steps in candidate selection. The software performs the basic hydraulic calculations and provides useful results in the form of tables, plots and graphs that would help in making better engineering decisions. An additional Managed Pressure Drilling worldwide wells database with basic information on a few Managed Pressure Drilling projects has also been compiled that can act as a basic guide on the Managed Pressure Drilling variation and project frequencies and aid in Managed Pressure Drilling candidate selection.

Nauduri, Anantha S.

2009-05-01T23:59:59.000Z

415

RESOLVING EQUIVOCALITY IN ECOSYSTEM MANAGEMENT  

E-Print Network (OSTI)

Management Simon Fraser University Dr. P.J.B. Duffy President, P.J.B. Duffy & Associates, Ltd. Environmental

416

Waste Management Quality Assurance Plan  

E-Print Network (OSTI)

PROGRAM .4 Organizational Structure ..4 Management Quality Assurance Functions 5 Planning 5 2.0 PERSONNEL TRAINING AND

Waste Management Group

2006-01-01T23:59:59.000Z

417

Knowledge management in mobile environment  

Science Conference Proceedings (OSTI)

Many knowledge management activities occur in working places and in our daily activities. On such occasions, mobile devices are tools to connect people with knowledge bases. In the mobile scenarios, the important knowledge management issue is how to ... Keywords: handheld devices, knowledge applications, knowledge sharing, m-commerce, mobile commerce, mobile communications, mobile devices, mobile knowledge management

Xiaoqing Li; Te-Wei Wang

2007-09-01T23:59:59.000Z

418

Energy Management and Conservation Plan  

E-Print Network (OSTI)

Energy Management and Conservation Plan December 2005 #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan Page 2 of 24 Table of Contents Section One: Executive: Reporting Progress #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan

419

Underground Distribution Cable Fleet Management  

Science Conference Proceedings (OSTI)

This report describes industry research and data collection related to distribution cable system management. Focus areas include international practices for cable system management, international research activities, and application of diagnostic testing techniques. This report is a follow-up to the 2010 effort to catalog leading practices for distribution cable fleet management.

2011-12-15T23:59:59.000Z

420

Data Management Group Annual Report  

E-Print Network (OSTI)

Data Management Group Annual Report 1997 #12;Data Management Group Annual Report 1997 A co-operative project that is jointly funded by members of the Toronto Area Transportation Planning Data Collection: (416) 978-3941 #12;Data Management Group 1997 Annual Report Table of Contents 1 INTRODUCTION

Toronto, University of

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Data Management Group Annual Report  

E-Print Network (OSTI)

Data Management Group Annual Report 2004 City of Hamilton City of Toronto GO Transit Regional of York Toronto Transit Commission The Data Management Group is a research program located of the funding partners: Ministry of Transportation, Ontario #12;SUMMARY The Data Management Group (DMG

Toronto, University of

422

CALIFORNIA STATE UNIVERSITY, RISK MANAGEMENT  

E-Print Network (OSTI)

performance within the CSU System. #12;2004 ­ 2005 Risk Management Annual Report Page 3 · Chaired the CSU-04 2004-05 Fullerton System-Wide #12;2004 ­ 2005 Risk Management Annual Report Page 10 University · International travel · Facilities use · Deferred maintenance Working with the University's Risk Management

de Lijser, Peter

423

Flexible management of smart homes  

Science Conference Proceedings (OSTI)

An approach is presented for flexible management of smart homes, covering both home automation and telecare. The aim is to allow end users to manage their homes without requiring detailed technical knowledge or programming ability. This is achieved at ... Keywords: Component framework, goal refinement, home automation, open services gateway initiative, policy-based management, sensor network, telecare

Kenneth J. Turner

2011-04-01T23:59:59.000Z

424

Copenhagen Waste Management and Incineration  

E-Print Network (OSTI)

Copenhagen Waste Management and Incineration Florence, April 24 2009 Julie B. Svendsen 24 20092 Presentation · General introduction to Copenhagen Waste Management System · National incentives · Waste Management plan 2012 · Incineration plants #12;Florence, April 24 20093 Copenhagen Waste

Columbia University

425

Smoke Management for Prescribed Burning  

E-Print Network (OSTI)

Smoke Management for Prescribed Burning E-1008 Oklahoma Cooperative Extension Service Division of Agricultural Sciences and Natural Resources Oklahoma State University Smoke Management for Prescribed Burning Extension #12;#12;Smoke Management for Prescribed Burning John R. Weir Research Associate Natural Resource

Balasundaram, Balabhaskar "Baski"

426

Western Veg Management EA  

NLE Websites -- All DOE Office Websites (Extended Search)

the the Glen Canyon to Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project within the Coconino National Forest DOE/EA-1863 July 2012 Lead Agency: United States Department of Energy, Western Area Power Administration Cooperating Agency: United States Forest Service Coconino National Forest FINAL ENVIRONMENTAL ASSESSMENT DOE/EA-1863 Glen Canyon - Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project Coconino and Yavapai Counties, Arizona U.S. Department of Energy Western Area Power Administration Desert Southwest Customer Service Region 615 South 43rd Avenue Phoenix, Arizona 85009 U.S. Department of Agriculture US Forest Service Coconino National Forest 1824 S. Thompson St. Flagstaff, AZ 86001 July 2012

427

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 4 8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

428

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual FY 2011 Pre- & Post-CAP Actual Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 77% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

429

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 69% Line Item 67% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

430

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target 1st Qtr FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

431

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

432

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 71% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

433

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

434

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A This metric has been overcome by events. Beginning in FY10, EM projects are to be measured against metric #1 above. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12,

435

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

436

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 79% Line Item 71% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

437

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

438

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

439

Management Control Cover  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Performance Fees in the Idaho Performance Fees in the Idaho National Laboratory Contract OAS-M-06-07 August 2006 REPORT ON MANAGEMENT CONTROLS OVER PERFORMANCE FEES IN THE IDAHO NATIONAL LABORATORY CONTRACT TABLE OF CONTENTS Performance Fees Details of Finding 1 Recommendations and Comments 4 Appendices 1. Objective, Scope, and Methodology 6 2. Other Matters 7 3. Related Audit Reports 8 4. Management Comments 9 PERFORMANCE FEES IN THE IDAHO NATIONAL LABORATORY CONTRACT Page 1 Details of Finding Performance Measures The Department of Energy (Department) did not always effectively and Fees use performance measures and fees to appropriately reward contractor performance. Specifically, the Department allocated approximately $1.1 million for 3 of the 27 performance measures

440

Environmental Management System Plan  

SciTech Connect

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

2009-03-24T23:59:59.000Z

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Electrical Demand Management  

E-Print Network (OSTI)

The Demand Management Plan set forth in this paper has proven to be a viable action to reduce a 3 million per year electric bill at the Columbus Works location of Western Electric. Measures are outlined which have reduced the peak demand 5% below the previous year's level and yielded $150,000 annual savings. These measures include rescheduling of selected operations and demand limiting techniques such as fuel switching to alternate power sources during periods of high peak demand. For example, by rescheduling the startup of five heat treat annealing ovens to second shift, 950 kW of load was shifted off peak. Also, retired, non-productive steam turbine chillers and a diesel air compressor have been effectively operated to displaced 1330 kW during peak periods each day. Installed metering devices have enabled the recognition of critical demand periods. The paper concludes with a brief look at future plans and long range objectives of the Demand Management Plan.

Fetters, J. L.; Teets, S. J.

1983-01-01T23:59:59.000Z

442

Best Management Practice: Cooling Tower Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Best Management Practice: Cooling Tower Management Best Management Practice: Cooling Tower Management Best Management Practice: Cooling Tower Management October 8, 2013 - 9:39am Addthis Cooling towers regulate temperature by dissipating heat from recirculating water used to cool chillers, air-conditioning equipment, or other process equipment. Heat is rejected from the tower primarily through evaporation. Therefore, by design, cooling towers consume significant amounts of water. Overview The thermal efficiency and longevity of the cooling tower and equipment used to cool depend on the proper management of water recirculated through the tower. Water leaves a cooling tower system in any one of four ways: Evaporation: This is the primary function of the tower and is the method that transfers heat from the cooling tower system to the

443

Appendix 8 - iManage Change Management Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appendix 8 iManage Change Management Standards Department of Energy Deliverable ID: PM1001 Version number: 1.0 Draft/Final as of: 7/23/2012 Printed on: 27 Jul 2012 Author: Michael Preis Michael.Preis@hq.doe.gov (301)903-3812 Owner: Lajos Grof-Tisza, iManage Program Manager Status of Document Draft Delivered Accepted Program Name: Department of Energy iManage Program Project ID: iManage Configuration Management Plan Program Mgr: Lajos Grof-Tisza Doc ID: PM1001 Draft ii Document information Document source This document is maintained as an online document. Contact the author for the latest version. Revision history Version number Date Summary of changes Revised By 1.00 26 Feb 2007 Initial Version Michael Preis Approvals

444

Synchrophasor Data Management  

Science Conference Proceedings (OSTI)

The nationwide deployment of synchrophasor technology has significantly expanded as a result of the funding provided by the American Recovery and Reinvestment Act (ARRA). As installations of phasor measurement units (PMUs) near completion, the power industry is achieving unprecedented wide-area synchrophasor coverage of the North American grid. With over 1000 synchrophasors installed and continuously streaming data, there will be new challenges in managing, storing, and using data. The objective of ...

2013-12-17T23:59:59.000Z

445

Cable Reliability Management Strategies  

Science Conference Proceedings (OSTI)

In previous collaborative research with several utilities, EPRI developed methods for forecasting the failures and cash flows associated with managing a population of underground cable. This study builds on that research and provides a method for developing least-cost repair and replacement policies for such a population. The policies specify when to replace a cable section or an entire circuit, depending on the age of the section and the number of failures the section has experienced.

2003-12-10T23:59:59.000Z

446

ANP LLW Management Review  

Science Conference Proceedings (OSTI)

The use of mobile LLW treatment and conditioning systems as a replacement for outdated or worn out permanently installed systems has provided significant flexibility and cost benefit at nuclear power plants over the past decade. The ability to select, install, and operate mobile systems successfully is dependent on advance planning, both in terms of waste management strategy and plant design. This report identifies mobile system technologies that utilities can use at any existing plant or ANP to treat or...

2005-08-11T23:59:59.000Z

447

Manhole Event Risk Management  

Science Conference Proceedings (OSTI)

This technical update report is an account of continuing research conducted in 2007 on managing and mitigating underground distribution manhole events. Major events that result in collateral damage are rare; but the energy involved in a major event is equivalent to that released by several sticks of dynamite; and it may present significant hazard to the public and result in costly litigation. Research effort in 2007 concentrated mainly on developing a software model of gas-related explosions that can be ...

2007-12-19T23:59:59.000Z

448

Catalyst Management Planning  

Science Conference Proceedings (OSTI)

Catalyst used in selective catalytic reduction (SCR) systems for NOx control in coal-fired power plants is susceptible to deactivation over time due to exposure to trace elements contained in the coal. In order to sustain the levels of NOx reduction needed to comply with regulatory requirements, periodic replacement of the catalyst modules with new or regenerated catalyst is an essential element in operating an SCR system. Catalyst management planning is a process whereby decisions are made about when ca...

2010-12-21T23:59:59.000Z

449

Outage Management Benchmarking Guideline  

Science Conference Proceedings (OSTI)

Benchmarking of power plant outages will help plants target performance improvements to specific elements of a plant outage program in order to improve overall availability, reliability, and safety while decreasing generation costs. EPRI's "Outage Management Benchmarking Guideline" builds on the Institute's fossil and nuclear plant experience with routine maintenance and extends that to outage maintenance processes. The guideline describes the initial steps in an outage benchmarking effort and 13 key ele...

2003-03-26T23:59:59.000Z

450

Treated Wood Pole Management  

Science Conference Proceedings (OSTI)

This document characterizes similarities and differences in international wood pole and wood pole preservative management. The research team identified practices for selection, regulation, and disposition of utility poles outside the United States. Most information is based on interviews and website and published literature searches. Additional research will clarify regulatory positions in other countries and generate improved understanding, which will support strategic planning for U.S. utilities. Utili...

2008-10-29T23:59:59.000Z

451

Corporate information management guidance  

SciTech Connect

At the request of the Department of Energy`s (DOE) Information Management (IM) Council, IM representatives from nearly all Headquarters (HQ) organizations have been meeting over the past year as the Corporate Guidance Group (CGG) to develop useful and sound corporate information management (IM) guidance. The ability of the Department`s IM community to develop such unified guidance continues to be critical to the success of future Departmental IM planning processes and the establishment of a well-coordinated IM environment between Headquarters and field organizations. This report, with 26 specific corporate IM guidance items documented and unanimously agreed to, as well as 12 items recommended for further development and 3 items deferred for future consideration, represents a highly successful effort by the IM community. The effort has proven that the diverse DOE organizations can put aside individual preferences and work together towards a common and mutually beneficial goal. In examining most areas and issues associated with information management in the Department, they have developed specific, far-reaching, and useful guidance. The IM representatives recommend that the documented guidance items provided in this report and approved by the DOE IM Council be followed by all IM organizations. The representatives also strongly recommend that the guidance process developed by the CGG be the single process for developing corporate IM guidance.

NONE

1997-08-01T23:59:59.000Z

452

Evaluating next-generation environmental policy tools : adaptive management in the Bureau of Land Management  

E-Print Network (OSTI)

The U.S. Bureau of Land Management (BLM) has begun to embrace the concept adaptive management as an alternative to traditional natural resource planning and management models. Adaptive management may provide BLM managers ...

Brandenburg, Peter (Peter J.)

2005-01-01T23:59:59.000Z

453

AVLIS production plant waste management plan  

Science Conference Proceedings (OSTI)

Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables.

Not Available

1984-11-15T23:59:59.000Z

454

Fleet Management | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Property Property » Fleet Management Fleet Management Fleet management includes commercial and agency owned motor vehicles such as cars, vans, trucks, and buses. Fleet (vehicle) management at the headquarters level includes a range of functions, such as vehicle data base management of the FAST, FMVRS, FedFMS, and UNICOR systems, annual motor vehicle utilization and budget forecast data, as well as the use and monitoring of GSA systems in their Fleet DriveThru data base. Fleet Briefings DOE Fleet Management Contact your Fleet manager for access to these systems Federal Automotive Statistical Tool (FAST): Supports EPAct of 1992 requirements , the Energy Conservation Reauthorization Act of 1998 (PL105-388), Executive Order 13149 Greening the Government Through Federal

455

Federal Energy Management Program: Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Services to Services to someone by E-mail Share Federal Energy Management Program: Services on Facebook Tweet about Federal Energy Management Program: Services on Twitter Bookmark Federal Energy Management Program: Services on Google Bookmark Federal Energy Management Program: Services on Delicious Rank Federal Energy Management Program: Services on Digg Find More places to share Federal Energy Management Program: Services on AddThis.com... Project Assistance Training Outreach Services The Federal Energy Management Program (FEMP) offers specialized services through: Technical and Project Assistance: Find resources for technical assistance and information about FEMP calls for projects. Training: Look up FEMP-produced live and on-demand courses, workshops, and webinars. Outreach: Get information about awards and campaigns that motivate energy-

456

Operational Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Management Operational Management Operational Management Operational Management Leadership Contact Information Office of Resource Management and Planning U.S. Department of Energy, MA-1.1 1000 Independence Ave., SW Washington, DC 20585 Marilyn L. Dillon Director marilyn.dillon@hq.doe.gov 202-586-4919 Office of Aviation Management U.S. Department of Energy, MA-30 1000 Independence Ave., SW Washington, DC 20585 Glen Wattman Director 202-586-5532 Glen.Wattman@hq.doe.gov Office of Administration U.S. Department of Energy, MA-40 1000 Independence Ave., SW Washington, DC 20585 Peter O'Konski Director 202-586-5710 peter.o'konski@hq.doe.gov Rebecca Montoya Deputy Director 202-586-0610 rebecca.montoya@hq.doe.gov Office of Engineering and Construction Management U.S. Department of Energy, MA-50

457

Records Management Exit Procedures | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

leave. Records Management Exit Procedures More Documents & Publications Records Management Exit Procedures Operational Plan and Desktop Reference for the Veterans...

458

PIA - Environmental Management Consolidated Business Center ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing Administration Other Agencies You are here Home PIA - Environmental Management Consolidated Business Center (EMCBC) PIA - Environmental Management Consolidated...

459

Integrated Safety Management Workshop Registration, PIA, Idaho...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Integrated...

460

Acquisition Career Management Program Handbook, Partial Revision...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Procurement and Assistance Management SUBJECT: Acquisition Career Management Program Handbook, Partial Revision of Chapter 11, Contracting Officer's Representative SUMMARY: The...

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Environmental Management Performance Measures, IG-0561 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Centers Field Sites Power Marketing Administration Other Agencies You are here Home Environmental Management Performance Measures, IG-0561 Environmental Management...

462

Comprehensive Municipal Solid Waste Management, Resource Recovery...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Municipal Solid Waste Management, Resource Recovery, and Conservation Act (Texas) Comprehensive Municipal Solid Waste Management, Resource Recovery, and Conservation...

463

Information Management Governance Frequently Asked Questions...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information Management Governance Frequently Asked Questions (FAQs) Information Management Governance Frequently Asked Questions (FAQs) Frequently Asked Questions (FAQs) of The...

464

CONTACTS FOR INFORMATION MANAGEMENT: Forms, Information Collection...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONTACTS FOR INFORMATION MANAGEMENT: Forms, Information Collection (PRA), & Records CONTACTS FOR INFORMATION MANAGEMENT: Forms, Information Collection (PRA), & Records Name Contact...

465

Community Energy Education Management Program | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Education Management Program Community Energy Education Management Program Eligibility Local Government Savings For Heating & Cooling Commercial Heating & Cooling Heating...

466

Water Resource Management (Indiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resource Management (Indiana) Water Resource Management (Indiana) Eligibility Agricultural Commercial Construction Fuel Distributor Industrial InstallerContractor Investor-Owned...

467

Ground Water Management Regulations (Louisiana) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ground Water Management Regulations (Louisiana) Ground Water Management Regulations (Louisiana) Eligibility Agricultural Construction Developer Fuel Distributor Industrial...

468

Federal Spectrum Management at the National Telecommunications...  

NLE Websites -- All DOE Office Websites (Extended Search)

Slides from National Telecommunications and Information Administration's presentation on Federal spectrum management. Federal Spectrum Management at the National...

469

Business Opportunities Session Office of Environmental Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Business Opportunities Session Office of Environmental Management Business Opportunities Session Office of Environmental Management Environmental Clean up Business Opportunities...

470

The Value of Information in Inventory Management  

E-Print Network (OSTI)

Inventory management traditionally assumes the precise knowledge of the ... stage inventory management in a robust optimization framework; the precise...

471

Continuing Management Reform | National Nuclear Security Administratio...  

National Nuclear Security Administration (NNSA)

Continuing Management Reform | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response...

472

Building International Emergency Management Systems | National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Building International Emergency Management Systems | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

473

Homeland Security and Emergency Management Coordination (HSEMC...  

NLE Websites -- All DOE Office Websites (Extended Search)

Homeland Security and Emergency Management Coordination (HSEMC) Program | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation...

474

NNSA Holds Radiation Emergency Consequence Management Training...  

National Nuclear Security Administration (NNSA)

Holds Radiation Emergency Consequence Management Training in Israel | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering...

475

Law Enforcement & Emergency Management Liaison | National Nuclear...  

National Nuclear Security Administration (NNSA)

Law Enforcement & Emergency Management Liaison | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

476

EERE Program Management Guide - About the Program Management Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Managers and their teams need to know what to do, how to do it, and why it needs to be done. User instructions help make EERE's program management processes and tools easier. The DOE and EERE Strategic Management System (SMS) provides a needed standard approach. Need for a Program Management "Operator's Guide" Program management is complex and difficult. It requires knowledge and discipline as well as a broad range of concepts, processes, and tools to be carried out effectively and efficiently. In the Office of Energy Efficiency and Renewable Energy (EERE) environment, many Program Managers and their teams bring to the job educational backgrounds and work experiences that are focused on science and technology. To complement that background they

477

Federal Energy Management Program: Federal Water Efficiency Best Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Water Efficiency Best Management Practices Water Efficiency Best Management Practices Water Sense at Work Logo for the EPA WaterSense The U.S. Environmental Protection Agency developed WaterSense at Work, a compilation of water-efficiency best management practices (BMPs), to help commercial and institutional facilities understand and manage water use, help facilities establish effective water-management programs, and identify projects and practices that reduce facility water use. FEMP originally developed Federal Water Efficiency Best Management Practices (BMPs) in response to Executive Order (E.O.) 13123 requirements, which required Federal agencies to reduce water use through cost-effective water efficiency improvements. E.O. 13423 supersedes E.O. 13123. To account for the superseded requirement changes, water use patterns, and advancing technologies, the Environmental Protection Agency's WaterSense Office updated the original BMPs.

478

Power management system  

DOE Patents (OSTI)

A method of managing power resources for an electrical system of a vehicle may include identifying enabled power sources from among a plurality of power sources in electrical communication with the electrical system and calculating a threshold power value for the enabled power sources. A total power load placed on the electrical system by one or more power consumers may be measured. If the total power load exceeds the threshold power value, then a determination may be made as to whether one or more additional power sources is available from among the plurality of power sources. At least one of the one or more additional power sources may be enabled, if available.

Algrain, Marcelo C. (Peoria, IL); Johnson, Kris W. (Washington, IL); Akasam, Sivaprasad (Peoria, IL); Hoff, Brian D. (East Peoria, IL)

2007-10-02T23:59:59.000Z

479

Procurement and Property Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Certificate of Current Cost or Pricing Data Certificate of Current Cost or Pricing Data This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 15.401 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15.403-4) submitted, either actually or by specific identification in writing, to Brookhaven's Procurement and Property Management in support of * are accurate, complete, and current as of *. This certification includes the cost or pricing data supporting any advance agreements and forward pricing rate agreements between the offeror and Brookhaven or the Government that are part of the proposal. Firm: ____________________________________________ Signature: ____________________________________________ Name: ____________________________________________

480

CHEMICAL MANAGEMENT PROGRAM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ames Laboratory Plan: 10200.035 Ames Laboratory Plan: 10200.035 Office: Environment, Safety, Health & Assurance Revision: 3 Title: Nanomaterials Safety Implementation Plan Effective Date: 4/15/2009 Page: 1 of 8 Review Date: 4/15/2010 NANOMATERIALS SAFETY IMPLEMENTATION PLAN Comments and questions regarding this plan should be directed to the contact person listed below: Name: Jim Withers Industrial Hygienist Address: G40 TASF Phone: 294-4743 Sign-off Record: Approved by: ______________________________________ Date: _______________ Tom E. Wessels, Manager, Environment, Safety, Health & Assurance Approved by: ______________________________________ Date: _______________ Dr. Bruce Harmon, Deputy Director Approved by: ______________________________________ Date: _______________

Note: This page contains sample records for the topic "management areva nc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Depleted uranium management alternatives  

SciTech Connect

This report evaluates two management alternatives for Department of Energy depleted uranium: continued storage as uranium hexafluoride, and conversion to uranium metal and fabrication to shielding for spent nuclear fuel containers. The results will be used to compare the costs with other alternatives, such as disposal. Cost estimates for the continued storage alternative are based on a life-cycle of 27 years through the year 2020. Cost estimates for the recycle alternative are based on existing conversion process costs and Capital costs for fabricating the containers. Additionally, the recycle alternative accounts for costs associated with intermediate product resale and secondary waste disposal for materials generated during the conversion process.

Hertzler, T.J.; Nishimoto, D.D.

1994-08-01T23:59:59.000Z

482

Environmental management system.  

Science Conference Proceedings (OSTI)

The purpose of the Sandia National Laboratories/New Mexico (SNL/NM) Environmental Management System (EMS) is identification of environmental consequences from SNL/NM activities, products, and/or services to develop objectives and measurable targets for mitigation of any potential impacts to the environment. This Source Document discusses the annual EMS process for analysis of environmental aspects and impacts and also provides the fiscal year (FY) 2010 analysis. Further information on the EMS structure, processes, and procedures are described within the programmatic EMS Manual (PG470222).

Salinas, Stephanie A.

2010-08-01T23:59:59.000Z

483

Plutonium Vulnerability Management Plan  

Science Conference Proceedings (OSTI)

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

484

DOE - Office of Legacy Management -- Fernald Environmental Management  

Office of Legacy Management (LM)

Fernald Environmental Management Fernald Environmental Management Project - 027 FUSRAP Considered Sites Site: Fernald Environmental Management Project (027) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Fernald Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center, is located about 18 miles northwest of Cincinnati, Ohio. The facility produced uranium metal products between 1953 and 1989 for use in production reactors to make plutonium and tritium at other Department of Energy (DOE) sites in support of United States defense programs. Uranium metal production ended in July 1989 and resources shifted

485

DOE - Office of Legacy Management -- Fernald Environmental Management...  

Office of Legacy Management (LM)

Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center, is located about 18 miles northwest of Cincinnati, Ohio. The facility...

486

Total Light Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Light Management Light Management Why is saving Energy Important World Electricity Consumption (2007) Top 20 Countries 0 500 1000 1500 2000 2500 3000 3500 4000 4500 U n i t e d S t a t e s C h i n a J a p a n R u s s i a I n d i a G e r m a n y C a n a d a A f r i c a F r a n c e B r a z i l K o r e a , S o u t h U n i t e d K i n g d o m I t a l y S p a i n A u s t r a l i a T a i w a n S o u t h A f r i c a M e x i c o S a u d i A r a b i a I r a n Billion kWh Source: US DOE Energy Information Administration Lighting Control Strategies 4 5 6 Occupancy/Vacancy Sensing * The greatest energy savings achieved with any lighting fixture is when the lights are shut off * Minimize wasted light by providing occupancy sensing or vacancy sensing 7 8 Daylight Harvesting * Most commercial space has enough natural light flowing into it, and the amount of artificial light being generated can be unnecessary * Cut back on the production of artificial lighting by

487

ISSUES MANAGEMENT PROGRAM MANUAL  

Science Conference Proceedings (OSTI)

The Lawrence Berkeley National Laboratory (LBNL) Issues Management Program encompasses the continuous monitoring of work programs, performance and safety to promptly identify issues to determine their risk and significance, their causes, and to identify and effectively implement corrective actions to ensure successful resolution and prevent the same or similar problems from occurring. This document describes the LBNL Issues Management Program and prescribes the process for issues identification, tracking, resolution, closure, validation, and effectiveness of corrective actions. Issues that are governed by this program include program and performance deficiencies or nonconformances that may be identified through employee discovery, internal or external oversight assessment findings, suggested process improvements and associated actions that require formal corrective action. Issues may also be identified in and/or may result in Root Cause Analysis (RCA) reports, Price Anderson Amendment Act (PAAA) reports, Occurrence Reporting and Processing System (ORPS) reports, Accident Investigation reports, assessment reports, and External Oversight reports. The scope of these issues may include issues of both high and low significance as well as adverse conditions that meet the reporting requirements of the University of California (UC) Assurance Plan for LBNL or other reporting entities (e.g., U.S. Environmental Protection Agency, U.S. Department of Energy). Issues that are found as a result of a walk-around or workspace inspection that can be immediately corrected or fixed are exempt from the requirements of this document.

Gravois, Melanie

2007-06-27T23:59:59.000Z

488

Environmental Compliance Management System  

SciTech Connect

Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy.

Brownson, L.W.; Krsul, T.; Peralta, R.A. [Argonne National Lab., Idaho Falls, ID (United States); Knudson, D.A.; Rosignolo, C.L. [Argonne National Lab., IL (United States)

1992-09-01T23:59:59.000Z

489

Environmental Compliance Management System  

SciTech Connect

Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy.

Brownson, L.W.; Krsul, T.; Peralta, R.A. (Argonne National Lab., Idaho Falls, ID (United States)); Knudson, D.A.; Rosignolo, C.L. (Argonne National Lab., IL (United States))

1992-01-01T23:59:59.000Z

490

Training Management Information System  

Science Conference Proceedings (OSTI)

The Training Management Information System (TMIS) is an integrated information system for all training related activities. TMIS is at the leading edge of training information systems used in the nuclear industry. The database contains all the necessary records to confirm the department's adherence to accreditation criteria and houses all test questions, student records and information needed to evaluate the training process. The key to the TMIS system is that the impact of any change (i.e., procedure change, new equipment, safety incident in the commercial nuclear industry, etc.) can be tracked throughout the training process. This ensures the best training can be performed that meets the needs of the employees. TMIS is comprised of six functional areas: Job and Task Analysis, Training Materials Design and Development, Exam Management, Student Records/Scheduling, Evaluation, and Commitment Tracking. The system consists of a VAX 6320 Cluster with IBM and MacIntosh computers tied into an ethernet with the VAX. Other peripherals are also tied into the system: Exam Generation Stations to include mark sense readers for test grading, Production PC's for Desk-Top Publishing of Training Material, and PC Image Workstations. 5 figs.

Rackley, M.P.

1989-01-01T23:59:59.000Z

491

Nuclear Material Management Abstract  

Science Conference Proceedings (OSTI)

Nevada Test Site (NTS) has transitioned from its historical and critical role of weapons testing to another critical role for the nation. This new role focuses on being a integral element in solving the multiple challenges facing the National Nuclear Security Administration (NNSA) with nuclear material management. NTS is positioned to be a solution for other NNSA sites challenged with safe nuclear materials storage and disposition. NNSA, with site involvement, is currently transforming the nuclear stockpile and supporting infrastructure to meet the 2030 vision. Efforts are under way to consolidate and modernize the production complex . With respect to the nuclear material stockpile, the NNSA sites are currently reducing the complex nuclear material inventory through disposition and consolidation. This includes moving material from other sites to NTS. State of the art nuclear material management and control practices at NTS are essential for NTS to ensure that assigned activities are accomplished in a safe, secure, efficient, and environmentally responsible manner. NTS activities and challenges will be addressed.

Jesse C. Schreiber

2007-07-10T23:59:59.000Z

492

Workflow Management Strategies at NERSC  

NLE Websites -- All DOE Office Websites (Extended Search)

Hadoop Hadoop Data Exploration Data Analysis and Mining Software/Hardware Strategies Workflow Management Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov consult@nersc.gov 1-800-66-NERSC, option 3 or 510-486-8611 Home » For Users » Data Analytics & Visualization » Workflow Management Workflow Management collage.jpg Workflow management refers to the process of connecting various software tools based on specific input and output parameters. The goal of workflow management is to automate specific sets of tasks that are repeated many

493

Carlsbad Field Office Manager Selected  

NLE Websites -- All DOE Office Websites (Extended Search)

Carlsbad Field Office Manager Selected CARLSBAD, N.M., November 10, 2011 - The U.S. Department of Energy's (DOE) Richland Operations Office (RL) Assistant Manager for the River Corridor Joe Franco was selected as Manager for the Carlsbad Field Office (CBFO), which oversees the Waste Isolation Pilot Plant (WIPP). CBFO Deputy Manager Ed Ziemianski has been acting in the CBFO Manager's position for the past year and will continue to serve as Deputy Manager. In operation since 1999, WIPP is a DOE facility designed to safely isolate defense-related transuranic (TRU) waste from people and the environment. Since 2006, Franco was responsible for cleanup and restoration of the 220 square miles of the

494

Records Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Records Management Services » Records Management Records Management In 2009, Legacy Management constructed a state-of-the-art facility known as the LM Business Center in Morgantown, West Virginia. The facility houses historical records from the nation's former nuclear production sites and serves as an information technology data center. Learn about how LM is meeting its goal to "Preserve, Protect, and Share Information." The U.S. Department of Energy (DOE) Office of Legacy Management (LM) has consolidated the business functions, including records management and records storage, information technology infrastructure, and other services at a new facility named the DOE LM Business Center (LMBC), located in Morgantown, West Virginia. The LMBC (formerly referred to as the LM Records Storage Facility), located

495

Program Management for Contracting Officers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Government Contracting - Government Contracting - A Project Manager's Perspective ???!!! Presented by John Baniszewski, Deputy Project Manager and Former Procurement Manager, NASA Goddard Space Flight Center 2 Project Managers and Contracting Officers: The Need to Understand Each Other * "I can't understand it. I can't even understand the people who can understand it" - Queen Juliana of the Netherlands * "Seek first to understand, and then to be understood" - Stephen Covey * "If one does not understand a person, one tends to regard him as a fool" - Carl Jung * "Before you contradict an old man, my fair friend, you should endeavor to understand him" - George Santayana 3 Project Managers and Procurement * "A Guide to the Project Management Body of

496

Oklahoma Industrial Energy Management Program  

E-Print Network (OSTI)

In Oklahoma, industry consumes about 35% of the total energy consumed. While it is true that much work has been done in the larger companies, most small to medium sized companies have yet to undertake a substantial energy management program. Often they simply do not understand the savings possible or the techniques available. Recognizing this, a program was developed to acquaint Oklahoma industry with the potential savings allowable through energy management techniques. The program is entitled 'Oklahoma Industrial Energy; Management Program' and is located at Oklahoma State University. This paper describes past, on-going, and proposed activities of this Program and assesses their impact. Included are industrial energy management conferences, closed circuit television short courses on selected energy management topics, energy auditing, industrial energy audits (through the Oklahoma Energy Analysis and Diagnostic Center) , energy and water management research, and two courses currently being offered.

Turner, W. C.; Estes, C. B.

1982-01-01T23:59:59.000Z

497

Microsoft PowerPoint - 6-03 DOE EM TEM Atlanta AREVA CCIM final 111010.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

November 17, 2010 November 17, 2010 Next-Generation Induction Melter Technology Development DOE EM Waste Processing Technical Exchange, Nov 16-18, 2010, Atlanta, GA Eric Tchemitcheff, AFS Print Close > DOE EM Waste Processing Technical Exchange - Nov 16-18, 2010 - Atlanta, GA 3 Presentation Outline Introduction CCIM Key Attributes CCIM Target Performance for Hanford WTP Applications EM Tank Waste R&D Plan Initiative 5.2.1  Scope and Objectives - CCIM Project CCIM Project - Proposed HLW Tasks and Milestones CCIM Project - Proposed LAW Tasks and Milestones CCIM Project - Summary FY10 Accomplishments CCIM Project - Anticipated Near-term Outcomes CCIM Project - Summary - Focus Areas Print Close > DOE EM Waste Processing Technical Exchange - Nov 16-18, 2010 - Atlanta, GA 4 DOE EM radwaste vitrification processing challenges are

498

Who is Constellation Energy Consorting With? Get to know Electricite de France (EDF) and AREVA  

E-Print Network (OSTI)

power plants. "The UK is the windiest country in Europe with the best wave and tidal resources," said Nuclear, with the express purpose of marketing and constructing the French-designed US Evolutionary Power its targets for wind power production in favor of EDF's plans to build a new generation of nuclear

Laughlin, Robert B.

499

6-03 DOE EM TEM Atlanta AREVA CCIM final 111010  

technically feasible, and provide sufficient data to forecast cost and schedule to deploy the technology EM Tank Waste R&D Plan Initiative 5.2.1

500

MANAGES Version 3.2  

Science Conference Proceedings (OSTI)

MANAGESsimplifies management of environmental data collected at coal ash management facilities, manufactured gas plant sites, and other locations where these data are regularly collected. MANAGESis a database software customized for management and interpretation of water quality, soil quality, and waste characterization data. It provides a variety of builtreports and graphs for displaying data, comparisons to regulatory limits, trend analyses, and statistical evaluation. The comprehensive statistical pac...

2010-11-17T23:59:59.000Z