Powered by Deep Web Technologies
Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Unified Procedures Applicable to Major Federal Actions Relating...  

Broader source: Energy.gov (indexed) [DOE]

Unified Procedures Applicable to Major Federal Actions Relating to Nuclear Activities Subject to Executive Order 12114 (State Department, 44 Fed Reg 65560) Unified Procedures...

2

Policy and Procedures for the Review of Federal Actions Impacting...  

Broader source: Energy.gov (indexed) [DOE]

Policy and Procedures for the Review of Federal Actions Impacting the Environment Policy and Procedures for the Review of Federal Actions Impacting the Environment This manual...

3

Environmental Effects Abroad of Major Federal Actions  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program -DepartmentNovember 1, 2010 EA-1797:DepartmentThird Annual44-NO. 62

4

Chronological History of Federal Fleet Actions and Mandates (Brochure)  

SciTech Connect (OSTI)

This chronological history of Federal fleet actions and mandates provides a year-by-year timeline of the acts, amendments, executive orders, and other regulations that affect Federal fleets. The fleet actions and mandates included in the timeline span from 1988 to 2009.

Not Available

2011-04-01T23:59:59.000Z

5

Fossil Fuel-Generated Energy Consumption Reduction for New Federal Buildings and Major Renovations of Federal Buildings  

Broader source: Energy.gov [DOE]

Document details Fossil Fuel-Generated Energy Consumption Reduction for New Federal Buildings and Major Renovations of Federal Buildings in a Supplemental Notice of Proposed Rulemaking.

6

Federal government information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations.

Not Available

1980-12-31T23:59:59.000Z

7

Natural Gas: Major Legislative and Regulatory Actions (1935 - 2008)  

Reports and Publications (EIA)

This special report Web-based product presents a chronology of some of the key federal legislative and regulatory actions that have helped shape the natural gas market, with particular emphasis on policy directives from 1978 to October 2008. Separate reports provide brief descriptions of specific legislation, regulations, or policies, and their impacts on the natural gas market.

2009-01-01T23:59:59.000Z

8

Environmental Effects Abroad of Major Federal Actions | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQBusinessinSupportingEnergy2

9

EO 12114: Environmental Effects Abroad of Major Federal Actions |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement ||MoreThis document

10

Unified Procedures Applicable to Major Federal Actions Relating to Nuclear  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of EnergyofProject is on Track| DepartmentPinakin PatelCooperation

11

Policy and Procedures for the Review of Federal Actions Impacting the Environment  

Broader source: Energy.gov [DOE]

This manual establishes polices and procedures for carrying out the EPA's responsibilities to review and comment on Federal actions affecting the quality of the environment. 

12

CEQ Guidance on the Application of NEPA to Proposed Federal Actions...  

Energy Savers [EERE]

Effects The purpose of this guidance is to clarify the applicability of the National Environmental Policy Act (NEPA) to proposed federal actions in the United States,...

13

Applicable or Relevant and Appropriate Requirements (ARARs) for Remedial Action at the Oak Ridge Reservation: A compendium of major environmental laws. Environmental Restoration Program  

SciTech Connect (OSTI)

Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances must comply with applicable or relevant and appropriate requirements (ARARS) or standards under federal and state environmental laws. The US Department of Energy (DOE) Oak Ridge Reservation (ORR) was placed on the National Priorities List by the US Environmental Protection Agency (EPA) on November 21, 1989, effective December 21, 1989. As a result of this listing, DOE, EPA, and the Tennessee Department of Environment and Conservation have signed a Federal Facility Agreement (FFA) for the environmental restoration of the ORR. Section XXI(F) of the FFA calls for the preparation of a draft listing of all ARARs as mandated by CERCLA {section}121. This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at the ORR. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Tennessee are listed in tables. In addition, the major provisions of the Resource Conservation and Recovery Act, the Safe Drinking Water Act, the Clean Water Act, the Clean Air and other acts, as they apply to hazardous waste cleanup, are discussed. In the absence of ARARS, CERCLA {section}121 provides for the use of nonpromulgated federal criteria, guidelines, and advisories in evaluating the human risk associated with remedial action alternatives. Such nonpromulgated standards are classified as ``to-be-considered`` (TBC) guidance. A ion of available guidance is given; summary tables fist the available federal standards and guidance information. In addition, the substantive contents of the DOE orders as they apply to remediation of radioactively contaminated sites are discussed as TBC guidance.

Etnier, E.L.; McDonald, E.P.; Houlberg, L.M.

1993-07-01T23:59:59.000Z

14

Federal-Tribal Partnership on Climate Change Action Rounds Corner, Shifts  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES ANDIndustrialEnergy FederalFLASHof

15

The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required “Implementation Proposal for The National Action Plan on Demand Response.”  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required “Implementation Proposal for The National Action Plan on Demand Response.”

16

Federal / State Legislative & Regulatory Changes Required for...  

Energy Savers [EERE]

Issues Federal and State Blending Restrictions Action by ASTM NCWM to address higher ethanol blends Federal State Legislative & Regulatory Changes Required for Introduction of...

17

SAVEnergy Action Plans  

SciTech Connect (OSTI)

The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

Mayo, K.; Westby, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States); deMonsabert, S. [George Mason Univ., Fairfax, VA (United States)] [George Mason Univ., Fairfax, VA (United States); Ginsberg, M. [USDOE, Washington, DC (United States)] [USDOE, Washington, DC (United States)

1994-04-01T23:59:59.000Z

18

Energy Action Month  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program (FEMP) supports Energy Action Month by offering materials that promote energy- and water-saving practices in Federal facilities. This year's outreach materials call on Federal employees to take action and empower leadership, innovation, and excellence to realize a secure energy future.

19

What is the Federal Demonstration Project  

SciTech Connect (OSTI)

The Federal Demonstration Project is a cooperative effort between a number of universities, a private research institute, and several federal agencies to increase research productivity by eliminating unnecessary administrative procedures and by streamlining and standardizing needed controls. The Project aims to locate responsibility for decision-making as close as possible to principal investigators while maintaining necessary institutional and agency oversight to ensure accountability. By freeing researchers from some of their paperwork burden, more efficient research administration systems will enable investigators to spend more of their time doing science and engineering. The Federal Demonstration Project is an outgrowth of an earlier activity sponsored by five major federal R D agencies at the Florida State University System and the University of Miami. In Florida, the focus was on standardizing and streamlining procedures for administering research grants after the grants had been awarded to the universities. (See Attachment 1 for descriptions of the demonstrations carried out under the Florida Demonstration Project). In May 1988, the most successful of the demonstrated procedures were approved by the US Office of Management and Budget for use in grants awarded by any federal agency to any research organization. The new procedures give agencies authority to waive requirements that grantees obtain federal approval prior to taking a number of administrative actions with respect to grant management. The FDP institutions together with the participating federal agencies are designing and demonstrating innovative research administration procedures and are assessing the impact of those new procedures.

Not Available

1990-01-01T23:59:59.000Z

20

Microsoft Word - 20130823-PR-32-13-Draft-plan-from-Federal-agencies...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

plan from Federal agencies details specific actions over next five years to benefit fish Portland, Ore. - Federal agencies and their partners outlined today specific actions...

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Chronological History of Federal Energy-Efficient Product Procurement...  

Broader source: Energy.gov (indexed) [DOE]

Chronological History of Federal Energy-Efficient Product Procurement: Executive, Legislative and Regulatory Requirements, Actions and Mandates Chronological History of Federal...

22

Energy Agency Coordinators for Energy Action Month  

Broader source: Energy.gov [DOE]

Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

23

ACTIONS AND PARTIAL ACTIONS OF INDUCTIVE CONSTELLATIONS  

E-Print Network [OSTI]

ACTIONS AND PARTIAL ACTIONS OF INDUCTIVE CONSTELLATIONS VICTORIA GOULD AND CHRISTOPHER HOLLINGS structure of a semigroup can be recovered from a partial order it possesses. Date: August 13, 2009. 2000 and FEDER, and also FCT post-doctoral grant SFRH/BPD/34698/2007. 1 #12;2 VICTORIA GOULD AND CHRISTOPHER

Gould, Victoria

24

Federal Biomass Activities  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Budget Federal Biomass Activities Federal Biomass Activities Biopower Biopower Biofuels Biofuels Bioproducts Bioproducts Federal Biomass Activities Federal Biomass...

25

Fort Worth Museum of Science and History: Reports on Federal Awards Program for the year ended September 30, 1994  

SciTech Connect (OSTI)

Six reports by independent accountants of the financial statements of the Fort Worth Museum of Science and History for the fiscal year ending September 30, 1994 are presented. The audits were performed on the financial statements on the (1) schedule of federal awards, (2) internal control structure, (3) compliance with laws, regulations, contracts, and grants, (4) the internal control structure used in administering federal awards, (5) compliance with general requirements, (6) compliance with specific requirements applicable to non-major program actions.

NONE

1994-12-31T23:59:59.000Z

26

Notice of Proposed Rulemaking, Federal Register, 75 FR 63404...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

15, 2010 Document details the notice of proposed rulemaking for Fossil Fuel-Generated Energy Consumption Reduction for New Federal Buildings and Major Renovations of Federal...

27

Fossil Fuel-Generated Energy Consumption Reduction for New Federal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fossil Fuel-Generated Energy Consumption Reduction for New Federal Buildings and Major Renovations of Federal Buildings OIRA Comparison Document Fossil Fuel-Generated Energy...

28

UNIVERSITY OF MICHIGAN NONDISCRIMINATION POLICY NOTICE The University of Michigan, as an equal opportunity/affirmative action employer, complies with all applicable federal and  

E-Print Network [OSTI]

UNIVERSITY OF MICHIGAN NONDISCRIMINATION POLICY NOTICE The University of Michigan, as an equal nondiscrimination and affirmative action. The University of Michigan is committed to a policy of equal opportunity-1432, 734-763-0235, TTY 734-647-1388. For other University of Michigan information call 734-764-1817. © 2013

Michigan, University of

29

Executive Order 12088: Federal Compliance with Pollution Control...  

Broader source: Energy.gov (indexed) [DOE]

actions are taken for the prevention, control, and abatement of environmental pollution with respect to Federal facilities and activities under the control of the agency....

30

Analysis of federal incentives used to stimulate energy consumption  

SciTech Connect (OSTI)

The purpose of the analysis is to identify and quantify Federal incentives that have increased the consumption of coal, oil, natural gas, and electricity. The introductory chapter is intended as a device for presenting the policy questions about the incentives that can be used to stimulate desired levels of energy development. In the theoretical chapter federal incentives were identified for the consumption of energy as Federal government actions whose major intent or result is to stimulate energy consumption. The stimulus comes through changing values of variables included in energy demand functions, thereby inducing energy consumers to move along the function in the direction of greater quantity of energy demanded, or through inducing a shift of the function to a position where more energy will be demanded at a given price. The demand variables fall into one of six categories: price of the energy form, price of complements, price of substitutes, preferences, income, and technology. The government can provide such incentives using six different policy instruments: taxation, disbursements, requirements, nontraditional services, traditional services, and market activity. The four major energy forms were examined. Six energy-consuming sectors were examined: residential, commercial, industrial, agricultural, transportation, and public. Two types of analyses of incentive actions are presented in this volume. The generic chapter focused on actions taken in 1978 across all energy forms. The subsequent chapters traced the patterns of incentive actions, energy form by energy form, from the beginning of the 20th century, to the present. The summary chapter includes the results of the previous chapters presented by energy form, incentive type, and user group. Finally, the implications of these results for solar policy are presented in the last chapter. (MCW)

Cole, R.J.; Cone, B.W.; Emery, J.C.; Huelshoff, M.; Lenerz, D.E.; Marcus, A.; Morris, F.A.; Sheppard, W.J.; Sommers, P.

1981-08-01T23:59:59.000Z

31

30-Day Federal Register Notice - Proposed  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Revised 11-2009 30-Day Federal Register Notice - Proposed 6450-01-P DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice...

32

Environmental Assessment of Remedial Action at the Riverton Uranium Mill Tailings Site, Riverton, Wyoming  

SciTech Connect (OSTI)

The US Department of Energy (DOE) has prepared an environmental assessment (DOE/EA-0254) on the proposed remedial action at the inactive uranium milling site near Riverton, Wyoming. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321, et seq.). Therefore, the preparation of an environmental impact statement (EIS) is not required.

none,

1987-06-01T23:59:59.000Z

33

Federal Actions to Address Impacts of Uranium  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '* FEB1f\l p :.; .FY-92 Report

34

Presidential DocumentsFederal Register Vol. 59, No. 32  

E-Print Network [OSTI]

Presidential DocumentsFederal Register Vol. 59, No. 32 Wednesday, February 16, 1994 Title 3-- The President Executive Order 12898 of February 11, 1994 Federal Actions To Address Environmental Justice, and consistent with the principles set forth in the report on the National Performance Review, each Federal

35

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

E-Print Network [OSTI]

) Office of General Counsel ­ Markets, Tariffs & Rates Federal Energy Regulatory Commission 888 FirstUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 18 CFR Chapter I (Docket No. RM05 Energy Regulatory Commission. ACTION: Notice of Inquiry (NOI). SUMMARY: The Federal Energy Regulatory

Laughlin, Robert B.

36

Federal Courts Not Federal Tribunals  

E-Print Network [OSTI]

The Court has employed inferred-cause-of-action doctrine to foster the rights of individuals, from injured workers to female college applicants to defrauded investors and targets of racial discrimination. Although the ...

Mulligan, Lumen N.

2010-01-01T23:59:59.000Z

37

Federal Register  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES ANDIndustrialEnergy FederalFLASH 2004-12 April 5, 2004

38

Federal Register  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES ANDIndustrialEnergy FederalFLASH 2004-12 April 5, 200465541 Vol. 79,

39

Federal Register  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICEACME |Supplement5869Google10 Federal

40

Federal Register  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICEACME |Supplement5869Google10 Federal2985

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Federal Register  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICEACME |Supplement5869Google102479 Federal

42

Federal Register  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICEACME |Supplement5869Google102479 Federal989

43

Federal Register  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICEACME |Supplement5869Google10247954 Federal

44

Federated search  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4:Epitaxial ThinFORFALL NEWS ROCKYGas FedEx®|default SignFederated

45

Intercity Passenger Rail Federal Funding presented by  

E-Print Network [OSTI]

Intercity Passenger Rail ­ Federal Funding Process presented by: Minnesota Department, equipment and connections ·! Long term: build efficient HSR network ­! Connecting major population centers ·! Lead state on Milwaukee to Twin Cities segment ·! 2008 state bonding to match federal funds

Minnesota, University of

46

FEDERAL INFORMATION PROCESSING STANDARD  

E-Print Network [OSTI]

March 2004 FEDERAL INFORMATION PROCESSING STANDARD (FIPS) 199, STANDARDS FOR SECURITY Information Technology Laboratory National Institute of Standards and Technology A new Federal Information Processing Standard (FIPS), recently approved by the Secretary of Commerce, will help federal agencies

47

Notice of Proposed Rulemaking, Federal Register, 75 FR 29933...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

75fr29933.pdf More Documents & Publications EA-1991: Notice of Proposed Rulemaking Green Building Certification Systems Requirement for New Federal Buildings and Major...

48

Green Building Certification Systems Requirement for New Federal...  

Energy Savers [EERE]

greenblgcert.docx More Documents & Publications EA-1991: Final Environmental Assessment Green Building Certification Systems Requirement for New Federal Buildings and Major...

49

Green Building Certification Systems Requirement for New Federal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

CFR Parts 433, 435 and 436. greenblgcertcompare2014.docx More Documents & Publications Green Building Certification Systems Requirement for New Federal Buildings and Major...

50

Federal Railroad Administration  

Broader source: Energy.gov (indexed) [DOE]

Transportation Federal Railroad Administration Overview of Proposed Rail Safety & Security Rulemakings Kevin R. Blackwell FRA Hazmat Division Washington, DC Federal Authority DOT...

51

Federal Railroad Administration  

Broader source: Energy.gov (indexed) [DOE]

Manager Federal Railroad Administration Federal Railroad Administration Dedicated Train Study- Report to Congress FRA' s Research & Development Office (as lead on the study)...

52

Corrective Action  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Corrective Action Individual Permit: Corrective Action Certifications If confirmation monitoring sample results demonstrate that one or more TALs are exceeded at a Site, the...

53

Federal Laboratory Technology Transfer  

E-Print Network [OSTI]

Federal Laboratory Technology Transfer Fiscal Year 2007 Prepared by: National Institute to present to the President and the Congress this Federal Laboratory Technology Transfer Report summarizing the achievements of Federal technology transfer and partnering programs of the Federal research and development

Perkins, Richard A.

54

Federal Aviation Administration  

E-Print Network [OSTI]

transportation systems FAA's RDT&E Organization: Federal Laboratory for R&D of aviation systems IndependentFederal Aviation Administration Federal Aviation AdministrationNextGen: Primer, Challenges. Wilson N. Felder Director, FAA William J. Hughes Technical Center Date: 6 February 2012 #12;2Federal

55

Federal Resume Guide  

Broader source: Energy.gov [DOE]

This Learning Module will offer helpful tips and suggestions on the development of a federal resume.

56

Mitigation Action Plan  

SciTech Connect (OSTI)

This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

Not Available

1994-02-01T23:59:59.000Z

57

Federal Compensation to Idaho for Public Domain Federal Lands, 1988-99 FederalCompensationtoIdaho  

E-Print Network [OSTI]

........................................................................................................ 9 Figure 7. Bingham County Federal Payments........................................................................................................ 12 Figure 15. Canyon County Federal Payments

O'Laughlin, Jay

58

Federal Energy Resources Modernization Coordinating Committee  

SciTech Connect (OSTI)

This report summarizes the broad range of activities that are focused on meeting the President's Executive Order on Federal Energy Management promulgated to meet energy savings goals and encourage more efficient management of all federal energy resources. These activities are reported semiannually under the auspices of the Federal Energy Resource Modernization (FERM) Coordinating Committee, and as such include activities undertaken from April 1, 1992, through September 30, 1992. The activities reported are classified into four major categories: (1) technology-base support, which includes development of processes, software, metering and monitoring equipment and strategies, and other tools for federal energy managers to better understand and characterize their energy resources; (2) federal energy systems testing and monitoring; (3) federal energy systems revitalization projects at federal installations in cooperation with the utilities serving the sites; and (4) energy supply, distribution and end-use conservation assessment for federal agencies and/or facilities. Lighting systems and air conditioning projects at federal facilities, especially military bases are updated.

Parker, G.B.

1993-04-01T23:59:59.000Z

59

Federal Facility Agreement progress report  

SciTech Connect (OSTI)

The (SRS) Federal Facility Agreement (FFA) was made effective by the US. Environmental Protection Agency Region IV (EPA) on August 16, 1993. To meet the reporting requirements in Section XXV of the Agreement, the FFA Progress Report was developed. The FFA Progress Report is the first of a series of quarterly progress reports to be prepared by the SRS. As such this report describes the information and action taken to September 30, 1993 on the SRS units identified for investigation and remediation in the Agreement. This includes; rubble pits, runoff basins, retention basin, seepage basin, burning pits, H-Area Tank 16, and spill areas.

Not Available

1993-10-01T23:59:59.000Z

60

Federal Agency NEPA Procedures  

Broader source: Energy.gov [DOE]

Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

FEDERAL ENERGY REGULATORY COMMISSION  

E-Print Network [OSTI]

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 NEWS RELEASE NEWS MEDIA CONTACT POWER MARKETS The Federal Energy Regulatory Commission today ordered its staff to conduct investigators will find out if any technical or operational factors, federal or state regulatory prohibitions

Laughlin, Robert B.

62

Federal Employee Training Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Manual provides detailed requirements to supplement DOE O 360.1B, FEDERAL EMPLOYEE TRAINING. The information in this Manual is intended to assist in improving Federal workforce performance under Department of Energy (DOE) managed Federal employee training. Cancels DOE M 360.1A-1. Canceled by DOE O 360.1C.

2001-10-11T23:59:59.000Z

63

Federal Employee Training Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Manual provides detailed requirements to supplement DOE O 360.1A, Federal Employee Training, dated 9-21-99. The information in this Manual is intended to assist in improving Federal workforce performance under Department of Energy (DOE) managed Federal employee training. Canceled by DOE M 360.1-1B.

1999-09-21T23:59:59.000Z

64

Federal Government Presence in  

E-Print Network [OSTI]

% since 1993 Source: Statistics Canada, Public Sector Employment, Table 183-0002. Figure 4 Federal of Federal Employment Source: Statistics Canada, Public Sector Employment, Table 183-0002. Figure 6 Federal #12;Employment Shares Across Provinces Source: Statistics Canada, Population, Table 51-0001 and Public

deYoung, Brad

65

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department of Energy (DOE) determined that the degree of uncertainty in transport predictions for PSA remained unacceptably large. As a result, a second CAIP was developed by DOE and approved by the Nevada Division of Environmental Protection (NDEP) in December 1998 (DOE/NV, 1998a). This plan prescribed a rigorous analysis of uncertainty in the Shoal model and quantification of methods of reducing uncertainty through data collection. This analysis is termed a Data Decision Analysis (Pohll et al., 1999a) and formed the basis for a second major characterization effort at PSA (Pohll et al., 1999b). The details for this second field effort are presented in an Addendum to the CAIP, which was approved by NDEP in April 1999 (DOE/NV, 1999a). Four additional characterization wells were drilled at PSA during summer and fall of 1999; details of the drilling and well installation are in IT Corporation (2000), with testing reported in Mihevc et al. (2000). A key component of the second field program was a tracer test between two of the new wells (Carroll et al., 2000; Reimus et al., 2003). Based on the potential exposure pathways, two corrective action objectives were identified for CAU 447: Prevent or mitigate exposure to groundwater contaminants of concern at concentrations exceeding regulatory maximum contaminant levels or risk-based levels; and Reduce the risk to human health and the environment to the extent practicable. Based on the review of existing data, the results of the modeling, future use, and current operations at PSA, the following alternatives have been developed for consideration at CAU 447: Alternative 1--No Further Action; Alternative 2--Proof-of-Concept and Monitoring with Institutional Controls; and Alternative 3--Contaminant Control. The corrective action alternatives were evaluated based on the approach outlined in the ''Focused Evaluation of Selected Remedial Alternatives for the Underground Test Area'' (DOE/NV, 1998b). Each alternative was assessed against nine evaluation criteria. These criteria include overall protection of human health and the environment;

Tim Echelard

2006-03-01T23:59:59.000Z

66

Talking sustainability: Federal intiatives target major water resources concerns  

E-Print Network [OSTI]

, Texas Tech University, and West Texas A&M University; about 85 engineers and scientists are on the research team. The researchers have been tasked with?among numerous other objectives?improving water management for crops to decrease dependence... the economic impacts of water management activities. As the project progresses, researchers make significant water discoveries. A research team determined that irrigation demand on the Texas High Plains could outpace the capacity to pump water from...

Lee, Leslie

2010-01-01T23:59:59.000Z

67

Talking sustainability:Federal initiatives target major water resources concerns  

E-Print Network [OSTI]

, Texas Tech University, and West Texas A&M University; about 85 engineers and scientists are on the research team. The researchers have been tasked with?among numerous other objectives?improving water management for crops to decrease dependence... the economic impacts of water management activities. As the project progresses, researchers make significant water discoveries. A research team determined that irrigation demand on the Texas High Plains could outpace the capacity to pump water from...

Lee, Leslie

2011-01-01T23:59:59.000Z

68

Obama Administration Officials to Announce Major Steps toward Federal  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced ScorecardReactor TechnologyOFFICE: I Oak Ridge,8 8 8 , ,withPilot

69

Federal Railroad Administration  

Broader source: Energy.gov (indexed) [DOE]

very similar to this bill in regard to the core provisions Core provisions: Review and reform the Federal hours of service requirements Establish a new risk reduction program...

70

Federal Employee Health Services  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes requirements and responsibilities for occupational medical, employee assistance, and workers' compensation programs for Federal employees. Cancels DOE O 341.1.

2007-10-18T23:59:59.000Z

71

From Federal Computer Week:  

National Nuclear Security Administration (NNSA)

Federal Computer Week: Energy agency launches performance-based pay system By Richard W. Walker Published on March 27, 2008 The Energy Department's National Nuclear Security...

72

Federal NEPA Contacts  

Broader source: Energy.gov [DOE]

CEQ and most Federal agencies identify primary points of contact for NEPA compliance. Normally a senior environmental professional, environmental law attorney, or member of agency leadership, these...

73

Federal Railroad Administration  

Broader source: Energy.gov (indexed) [DOE]

- HQ Hazmat Division, Washington, DC. Federal Railroad Administration Dedicated Train Study - Report to Congress November 2003 - FRA' s Ofc. Of Research & Development...

74

Federal Technical Capability Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Federal Technical Capability Manual provides the process for the recruitment, deployment, development, and retention of Federal personnel with the demonstrated technical capability to safely accomplish the Departments missions and responsibilities at defense nuclear facilities. Canceled by DOE M 426.1-1A. Does not cancel other directives.

2000-06-05T23:59:59.000Z

75

Federal Technical Capability  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This directive defines requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Cancels DOE M 426.1-1A, Federal Technical Capability Manual.

2009-11-19T23:59:59.000Z

76

FEDERAL ENERGY REGULATORY COMMISSION  

E-Print Network [OSTI]

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 NEWS RELEASE NEWS MEDIA CONTACT AND FERC STAFF The Federal Energy Regulatory Commission today accepted a settlement, valued at nearly $500 stemming from the 2000-2001 energy crisis in California and other Western states. The global settlement

Laughlin, Robert B.

77

FEDERAL ENERGY REGULATORY COMMISSION  

E-Print Network [OSTI]

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 NEWS RELEASE NEWS MEDIA CONTACT SETTLEMENT BETWEEN DUKE AND COMMISSION STAFF The Federal Energy Regulatory Commission today accepted a settlement between the Commission's enforcement staff and Houston-based units of Duke Energy that resolves

Laughlin, Robert B.

78

FEDERAL ENERGY REGULATORY COMMISSION  

E-Print Network [OSTI]

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 NEWS RELEASE NEWS MEDIA CONTACT POWER EXCHANGE MARKET The Federal Energy Regulatory Commission today approved a staff settlement calling-2-001 COMMISSION APPROVES $13.8 MILLION SETTLEMENT WITH RELIANT ENERGY OVER PHYSICAL WITHHOLDING IN CALIFORNIA

Laughlin, Robert B.

79

FEDERAL ENERGY REGULATORY COMMISSION  

E-Print Network [OSTI]

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 NEWS RELEASE NEWS MEDIA CONTACT The Federal Energy Regulatory Commission today accepted an agreement between Nevada Power and Sierra Pacific. AGREEMENT ACCEPTED BETWEEN ENRON AND NEVADA COMPANIES SETTLING MATTERS STEMMING FROM WESTERN ENERGY CRISIS

Laughlin, Robert B.

80

FEDERAL ENERGY REGULATORY COMMISSION  

E-Print Network [OSTI]

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 NEWS RELEASE NEWS MEDIA CONTACT FERC APPROVES SETTLEMENT WITH RELIANT IN CALIFORNIA CASES; PROCEEDS COULD TOTAL $50 MILLION The Federal Energy Regulatory Commission today approved a settlement between the Commission's enforcement staff

Laughlin, Robert B.

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

FEDERAL ENERGY REGULATORY COMMISSION  

E-Print Network [OSTI]

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 NEWS RELEASE NEWS MEDIA CONTACT CRISIS The Federal Energy Regulatory Commission today approved a comprehensive settlement among APX Inc. Coral Power LLC, Puget Sound Energy Inc. and Avista are Supporting Parties. R-07-14 (30) #12;

Laughlin, Robert B.

82

FEDERAL ENERGY REGULATORY COMMISSION  

E-Print Network [OSTI]

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 NEWS RELEASE NEWS MEDIA CONTACT-95-191 COMMISSION APPROVES TWO WESTERN POWER SETTLEMENTS The Federal Energy Regulatory Commission today approved two markets during the Western energy crisis of 2000-2001. The first case involves a settlement agreement

Laughlin, Robert B.

83

Electricity Advisory Committee - Federal Register Notices | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Federal Register Notices Electricity Advisory Committee - Federal Register Notices Electricity Advisory Committee - Federal Register Notices September 3, 2014 Electricity Advisory...

84

Federal Activities in the Bioeconomy  

Broader source: Energy.gov [DOE]

Plenary V: Federal Activities in the Bioeconomy Federal Activities in the Bioeconomy Zia Haq, Senior Analyst, Technology Manager, Bioenergy Technologies Office, U.S. Department of Energy

85

High-Performance Sustainable Building Design for New Construction and Major Renovations  

Broader source: Energy.gov [DOE]

New construction and major renovations to existing buildings offer Federal agencies opportunities to create sustainable high-performance buildings. High-performance buildings can incorporate energy...

86

Economic Energy Savings Potential in Federal Buildings  

SciTech Connect (OSTI)

The primary objective of this study was to estimate the current life-cycle cost-effective (i.e., economic) energy savings potential in Federal buildings and the corresponding capital investment required to achieve these savings, with Federal financing. Estimates were developed for major categories of energy efficiency measures such as building envelope, heating system, cooling system, and lighting. The analysis was based on conditions (building stock and characteristics, retrofit technologies, interest rates, energy prices, etc.) existing in the late 1990s. The potential impact of changes to any of these factors in the future was not considered.

Brown, Daryl R.; Dirks, James A.; Hunt, Diane M.

2000-09-04T23:59:59.000Z

87

Federal Water Use Indices  

Broader source: Energy.gov [DOE]

FEMP provides water use indices as a guide for Federal agencies. Note that each is a rough estimate of water usage at different types of sites. Your site may vary considerably.

88

Federal Employee Health Services  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish requirements and responsibilities for occupational medical, employee assistance, and workers' compensation programs for Federal employees. Cancels DOE 3790.1B. Canceled by DOE O 341.1A.

2003-12-01T23:59:59.000Z

89

Federal Protective Force  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Manual establishes requirements for the management and operation of the Department of Energy (DOE) Federal protective forces (FPFs). Cancels DOE M 470.4-3, Chg 1. Canceled by DOE O 473.3.

2009-07-15T23:59:59.000Z

90

AGENCY LEVEL PROTEST PROCEDURES Federal Register: April 6, 1999 (Volume 64, Number 65)  

E-Print Network [OSTI]

AGENCY LEVEL PROTEST PROCEDURES Federal Register: April 6, 1999 (Volume 64, Number 65)] [Rules; Agency Protest Procedures AGENCY: Department of Commerce. ACTION: Final rule, Section 103, to include ``Agency Protest Procedures-Level Above the Contracting Officer.'' The Department

91

Corrective Action Plan for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 151, Septic Systems and Discharge Area, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 151 consists of eight Corrective Action Sites (CASs) located in Areas 2, 12, and 18 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada.

NSTec Environmental Restoration

2007-03-01T23:59:59.000Z

92

The Florida Economy and a Federal Carbon Cap  

E-Print Network [OSTI]

The Florida Economy and a Federal Carbon Cap A QuAntitAtive AnAlysis Authors David Roland-Holst Dep-and-trade program--the policy recommended by Governor Crist's Action Team--on the Florida economy over the coming decades. The model looks at the entire Florida economy on an interactive basis over time, and takes

Sadoulet, Elisabeth

93

Climate Change Adaptation: A Collective Action Perspective on Federalism Considerations  

E-Print Network [OSTI]

adaptation to minimize the adverse effects of climate change. Climate change adaptation is designed to increase the resilience of natural and human ecosystems to the threats posed by a changing environment. Although an extensive literature concerning...

Glicksman, Robert L.; Levy, Richard E.

2010-01-01T23:59:59.000Z

94

Federal-Tribal Partnership on Climate Change Action Rounds Corner...  

Energy Savers [EERE]

David Conrad Acting Director - Office of Indian Energy Policy and Programs The 2013 White House Tribal Nations Conference, held Wednesday, November 13 at the Department of the...

95

Executive Order 12898: Federal Actions to Address Environmental...  

Office of Environmental Management (EM)

and with State, local, and tribal governments. Sec. 4-4. Subsistence Consumption of Fish and Wildlife. 4-401. Consumption Patterns. In order to assist in identifying the need...

96

Executive Order 12898: Federal Actions to Address Environmental Justice in  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecember U.S. Department of9 ExaminationExecutive

97

Memorandum for Federal NEPA Contacts: Emergency Actions and NEPA |  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't32 Master EM ProjectMemo DistributingOn March 31, 2011,

98

Action Items  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartment of EnergyAbout Us » FAQsUCNIOF ENERGYU.S.-BrazilACTION

99

Federal Register Notice  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResourcesFLASH2011-11-OPAMFY 2007 Total System12Federal Long Tern810 Federal Register

100

Advanced Metering Implementations - A Perspective from Federal Sector  

SciTech Connect (OSTI)

Federal mandate (EPACT 2005) requires that federal buildings install advanced electrical meters-meters capable of providing data at least daily and measuring the consumption of electricity at least hourly. This work presents selected advanced metering implementations to understand some of the existing practices related to data capture and to understand how the data is being translated into information and knowledge that can be used to improve building energy and operational performance to meet federal energy reduction mandates. This study highlights case studies to represent some of the various actions that are being taken based on the data that are being collected to improve overall energy performance of these buildings. Some of these actions include- individualized tenant billing and energy forecasting, benchmarking, identifying energy conservation measures, measurement and verification.

Eaarni, Shankar

2014-08-11T23:59:59.000Z

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

A Brief History of the Federal Columbia River Power System  

E-Print Network [OSTI]

tributaries. Investor-owned and publicly owned utilities also built a major system of dams and generating, navigation, recreation, and other river uses. From the beginning, the federal government has played a major Columbia River Treaty with Canada* As demand for power grew, the United States and Canadian governments

102

Federal Laboratory Technology Transfer  

E-Print Network [OSTI]

Federal Laboratory Technology Transfer Fiscal Year 2009 Prepared by: National Institute to submit this fiscal year 2009 Technology Transfer Summary Report to the President and the Congress in accordance with 15 USC Sec 3710(g)(2) for an annual summary on the implementation of technology transfer

Perkins, Richard A.

103

Federal Laboratory Technology Transfer  

E-Print Network [OSTI]

Federal Laboratory Technology Transfer Fiscal Year 2008 Prepared by: National Institute to submit this fiscal year 2008 Technology Transfer Summary Report to the President and the Congress transfer authorities established by the Technology Transfer Commercialization Act of 2000 (P.L. 106

Perkins, Richard A.

104

632 Appendix Federal Infonnation  

E-Print Network [OSTI]

632 Appendix Federal Infonnation Processing Standards Publication 46 1977 JanuW)' 15 ANNOUNCING. d.,~ !oh)' II. 1973). and P." 6 of Tit\\rCt·Rl. Name (If Standard with a key. The key is generated in such a way that each of the 56 bits used directly by the algori~hrn an' r

Holden, Joshua Brandon

105

da Reitoria UNIVERSIDADE FEDERAL  

E-Print Network [OSTI]

Aperfeiçoamento Institucional. A PRESIDENTE DO CONSELHO UNIVERSITÁRIO da Universidade Federal de Santa Catarina, mudando o nome da Secretaria Especial de Aperfeiçoamento Institucional para "Secretaria de Aperfeiçoamento) Secretaria de Relações Internacionais; c) Secretaria de Gestão de Pessoas; d) Secretaria de Aperfeiçoamento

Floeter, Sergio Ricardo

106

Federal Employee Training  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To plan and establish requirements and assign responsibilities for Department of Energy (DOE) Federal employee training, education, and development (hereafter referred to as "training") under the Government Employees Training Act of 1958. Cancels DOE O 360.1A. Canceled by DOE O 360.1C.

2001-10-11T23:59:59.000Z

107

Federal Employee Training  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To plan and establish requirements and assign responsibilities for Department of Energy (DOE) Federal employee training, education, and development under the Government Employees Training Act of 1958, as amended. Cancels DOE O 360.1. Canceled by DOE O 360.1B.

1999-09-21T23:59:59.000Z

108

Federal Employee Training  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Order establishes requirements and responsibilities for DOE Federal employee training in accordance with Chapter 41 of Title 5, United States Code (U.S.C.). Cancels DOE O 360.1B and DOE M 360.1-1B.

2011-07-06T23:59:59.000Z

109

Federal Technical Capability  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To define requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Chg. 1 dated 9-20-11 Cancels DOE O 426.1. Cancels DOE P 426.1.

2009-11-19T23:59:59.000Z

110

Federal Memorandum of Understanding for Hydropower/Federal Inland...  

Open Energy Info (EERE)

of Energy Environmental Protection Agency Federal Energy Regulatory Commission Fish and Wildlife Service Forest Service National Oceanic and Atmospheric Administration...

111

ICDF Complex Remedial Action Report  

SciTech Connect (OSTI)

This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

W. M. Heileson

2007-09-26T23:59:59.000Z

112

Meeting Federal Energy Security Requirements  

Broader source: Energy.gov [DOE]

Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the opportunity to increase the scope of federal-utility partnerships for meeting energy security requirements.

113

2008 Federal Energy Management Program (FEMP) Market Report  

SciTech Connect (OSTI)

This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

Tremper, C.

2009-07-01T23:59:59.000Z

114

Federal Utility Partnership Working Group  

Broader source: Energy.gov [DOE]

The Federal Utility Partnership Working Group (FUPWG) establishes partnerships and facilitates communications among Federal agencies, utilities, and energy service companies. The group develops strategies to implement cost-effective energy efficiency and water conservation projects through utility incentive programs at Federal sites.

115

Federal Presence in Newfoundland and  

E-Print Network [OSTI]

with the national levels Primary reliance on Statistics Canada data Objective: to inform the debate #12;II Employment Federal Government employment Overall Military Executives Federal Government Business Enterprises employment #12;Figure 7 Federal Government Employment Newfoundland and Labrador, 1981-2005 0 2

deYoung, Brad

116

Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring and Evaluation FY08 Annual Report.  

SciTech Connect (OSTI)

The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration (BPA), U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included (1) subgroup meetings; (2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via BPA's project tracking system, Pisces; (4) quarterly project status reports; and (5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on FCRPS operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.

Johnson, GE; Diefenderfer, HL [Pacific Northwest National Laboratory

2008-09-29T23:59:59.000Z

117

Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring, and Evaluation, FY08 Annual Report  

SciTech Connect (OSTI)

The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included 1) subgroup meetings; 2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, Pisces; 4) quarterly project status reports; and 5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on hydrosystem operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.

Johnson, Gary E.; Diefenderfer, Heida L.

2008-09-29T23:59:59.000Z

118

Trumping and Power Majorization  

E-Print Network [OSTI]

Majorization is a basic concept in matrix theory that has found applications in numerous settings over the past century. Power majorization is a more specialized notion that has been studied in the theory of inequalities. On the other hand, the trumping relation has recently been considered in quantum information, specifically in entanglement theory. We explore the connections between trumping and power majorization. We prove an analogue of Rado's theorem for power majorization and consider a number of examples.

David W. Kribs; Rajesh Pereira; Sarah Plosker

2012-10-24T23:59:59.000Z

119

Executive Order 13423- Strengthening Federal Environmental, Energy...  

Energy Savers [EERE]

423- Strengthening Federal Environmental, Energy, and Transportation Management Executive Order 13423- Strengthening Federal Environmental, Energy, and Transportation Management It...

120

Federal Biomass Activities | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Federal Biomass Activities Federal Biomass Activities Statutory and executive order requirements for Bioproducts and Biofuels federalbiomassactivities.pdf More Documents &...

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Federal Fiduciary Duties for Directors  

E-Print Network [OSTI]

requirements for private actions). See Exchange Act § 21 (the ways in which private causes of action and the SEC’srecitation of the private causes of action and all of their

Sale, Hillary

2006-01-01T23:59:59.000Z

122

Federal royalty oil eligibility requirements: the plateau legacy  

SciTech Connect (OSTI)

The courts ruled in the 1979 Plateau decision that the Secretary of the Interior is obligated to allocate federal royalty oil among all refineries not having their own crude oil source of supply, and can not impose Small Business Administration (SBA) eligibility requirements on potential purchasers of federal royalty oil. The effects of this decision was to derail the government's attempt to make royalty oil produced from Outer Continental Shelf leases and onshore sites available to the same refiners. The Minerals Management Service has yet to adopt final regulations harmonizing the court's ruling with applicable statutory requirements, resulting in actions of dubious legality. 75 references.

Zimmerman, J.J.; Bullerdick, K.H.

1984-01-01T23:59:59.000Z

123

The Picatinny Technology Transfer Innovation Center: A business incubator concept adapted to federal laboratory technology transfer  

SciTech Connect (OSTI)

In recent years, the US defense industrial base spawned the aerospace industry, among other successes, and served as the nation`s technology seed bed. However, as the defense industrial base shrinks and public and private resources become scarcer, the merging of the commercial and defense communities becomes necessary to maintain national technological competencies. Cooperative efforts such as technology transfer provide an attractive, cost-effective, well-leveraged alternative to independently funded research and development (R and D). The sharing of knowledge, resources, and innovation among defense contractors and other public sector firms, academia, and other organizations has become exceedingly attractive. Recent legislation involving technology transfer provides for the sharing of federal laboratory resources with the private sector. The Army Research, Development and Engineering Center (ARDEC), Picatinny Arsenal, NJ, a designer of weapons systems, is one of the nation`s major laboratories with this requirement. To achieve its important technology transfer mission, ARDEC reviewed its capabilities, resources, intellectual property, and products with commercial potential. The purpose of the review was to develop a viable plan for effecting a technology transfer cultural change within the ARDEC, Picatinny Arsenal and with the private sector. This report highlights the issues identified, discussed, and resolved prior to the transformation of a temporarily vacant federal building on the Picatinny installation into a business incubator. ARDEC`s discussions and rationale for the decisions and actions that led to the implementation of the Picatinny Technology Transfer Innovation Center are discussed.

Wittig, T. [Geo-Centers, Inc. (United States); Greenfield, J. [Armaments Research, Development and Engineering Center, Picatinny Arsenal, NJ (United States)

1996-10-01T23:59:59.000Z

124

Corrective Action Investigation Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada National Security Site, Nevada with ROTCs 1, 2, and 3 (Revision 0, September 2000)  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate Corrective Action Alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 97 under the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 97, collectively known as the Yucca Flat/Climax Mine CAU, consists of 720 Corrective Action Sites (CASs). The Yucca Flat/Climax Mine CAU extends over several areas of the NTS and constitutes one of several areas used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in the vicinity as well as downgradient of the underground test areas. Based on site history, the Yucca Flat underground nuclear tests were conducted in alluvial, volcanic, and carbonate rocks; whereas, the Climax Mine tests were conducted in an igneous intrusion located in northern Yucca Flat. Particle-tracking simulations performed during the regional evaluation indicate that the local Climax Mine groundwater flow system merges into the much larger Yucca Flat groundwater flow systems during the 1,000-year time period of interest. Addressing these two areas jointly and simultaneously investigating them as a combined CAU has been determined the best way to proceed with corrective action investigation (CAI) activities. The purpose and scope of the CAI includes characterization activities and model development conducted in five major sequential steps designed to be consistent with FFACO Underground Test Area Project's strategy to predict the location of the contaminant boundary, develop and implement a corrective action, and close each CAU. The results of this field investigation will support a defensible evaluation of CAAs in the subsequent corrective action decision document.

Andrews, Robert; Marutzky, Sam

2000-09-01T23:59:59.000Z

125

Develop an Institutional Change Action Plan for Sustainability  

Broader source: Energy.gov [DOE]

After establishing a goal and assessing the rules, roles, and tools, Federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals). This action plan should target specific audiences with tailored strategies and take into account the need to review and revise strategies in the long-term. The action plan must include appropriate metrics and regular measurement. Remember that planning useful efficiency and sustainability evaluation is necessary before an organization begins to implement an action plan.

126

Direct Federal Financial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phasesData FilesShape,PhysicsDileepDiracNanotubes . |Federal

127

Federal Financial Report  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import96Nebraska NuclearDecade2003 DetailedUsebaseline 12FEDERAL

128

WIPP Documents - Federal Regulations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies | Blandine Jerome VelenciaNewsNewsFederal Regulations 40 CFR

129

Coordination of Federal Transmission Permitting on Federal Lands...  

Office of Environmental Management (EM)

transmission facilities on federal lands. In most instances, the Departments of Agriculture or Interior will be the Lead Agency, since they have jurisdiction over most of the...

130

EA-1463: 10 CFR 433: Energy Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings and 10 CFR 435: Energy Efficiency Standards for New Federal Residential Low-Rise Residential Buildings  

Broader source: Energy.gov [DOE]

The EA examines the potential environmental impacts of the Final Rule on building habitability and the outdoor environment. To identify the potential environmental impacts that may result from implementing the Final Rule for new Federal commercial and residential buildings, DOE compared the Final Rule with the “no-action alternative” of using the current Federal standards – 10 CFR Part 434 and 10 CFR Part 435 Subpart C (referred to as the “no-action alternative”).

131

Corrective Action Decision Document/Closure Report for Corrective Action Unit 370: T-4 Atmospheric Test Site, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 370, T-4 Atmospheric Test Site, located in Area 4 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 370 is comprised of Corrective Action Site (CAS) 04-23-01, Atmospheric Test Site T-4. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 370 due to the implementation of the corrective action of closure in place with administrative controls. To achieve this, corrective action investigation (CAI) activities were performed from June 25, 2008, through April 2, 2009, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 370: T-4 Atmospheric Test Site and Record of Technical Change No. 1.

Patrick Matthews

2009-05-01T23:59:59.000Z

132

Oil and gas: Oilfield class actions  

SciTech Connect (OSTI)

The use of class actions is getting alot of attention in the oilfield. Plaintiffs have filed class actions challenging two of the most rooted industry practices, oil posted prices and deregulated natural gas affiliate deduction and charges. The classes will include tens or hundreds of thousands of plaintiffs and may transform two of the industry`s most settled practices. The emotions surrounding the class action risk obscuring the fact that it is an old and oft-used tool in oilfield litigation. The class action {open_quotes}provides a means by which, where a large group of persons are interested in a matter, one or more may sue or be sued as representatives of the class without needing to join every member of the class.{close_quotes} The procedure avoids waste by combining scattered disputes, even if some injured might sue individually, and it enables plaintiffs who could not afford to sue to be represented anyway. The lawyers draw their fees from any recovery. Almost all oilpatch class actions are brought to resolve a {open_quotes}common question{close_quotes} under Federal Rules of Civil Procedure 23(b)(3) or state counterparts. The rule`s {open_quotes}opt-out{close_quotes} provisions give class actions a tremendous boost because members stay in unless they take steps to get out. This article discusses present and future class actions.

McArthur, J.B.

1997-06-01T23:59:59.000Z

133

Technology Potential of Thermal Energy Storage (TES) Systems in Federal Facilities  

SciTech Connect (OSTI)

This document presents the findings of a technology market assessment for thermal energy storage (TES) in space cooling applications. The potential impact of TES in Federal facilities is modeled using the Federal building inventory with the appropriate climatic and energy cost data. In addition, this assessment identified acceptance issues and major obstacles through interviews with energy services companies (ESCOs), TES manufacturers, and Federal facility staff.

Chvala, William D.

2001-07-31T23:59:59.000Z

134

THE CONTENT OF CORPORATE FEDERALISM  

E-Print Network [OSTI]

Federalism in Corporate Governance: Protecting ShareholderCollaborative Corporate Governance: Listing Standards, Stateof Care Stadanrd in Corporate Governance 75 Iowa L. Rev. 1,

Bratton, William W.

2004-01-01T23:59:59.000Z

135

Federal Buildings Supplemental Survey 1993  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) of the US Department of Energy (DOE) is mandated by Congress to be the agency that collects, analyzes, and disseminates impartial, comprehensive data about energy including the volume consumed, its customers, and the purposes for which it is used. The Federal Buildings Supplemental Survey (FBSS) was conducted by EIA in conjunction with DOE`s Office of Federal Energy Management Programs (OFEMP) to gain a better understanding of how Federal buildings use energy. This report presents the data from 881 completed telephone interviews with Federal buildings in three Federal regions. These buildings were systematically selected using OFEMP`s specifications; therefore, these data do not statistically represent all Federal buildings in the country. The purpose of the FBSS was threefold: (1) to understand the characteristics of Federal buildings and their energy use; (2) to provide a baseline in these three Federal regions to measure future energy use in Federal buildings as required in EPACT; and (3) to compare building characteristics and energy use with the data collected in the CBECS.

NONE

1995-11-01T23:59:59.000Z

136

EIS-0412: Federal Loan Guarantee to Support Construction of the TX Energy LLC, Industrial Gasification Facility near Beaumont, Texas  

Broader source: Energy.gov [DOE]

The Department of Energy is assessing the potential environmental impacts for its proposed action of issuing a Federal loan guarantee to TX Energy, LLC (TXE). TXE submitted an application to DOE under the Federal loan guarantee program pursuant to the Energy Policy Act of 2005 (EPAct 2005) to support construction of the TXE industrial Gasification Facility near Beaumont, Texas.

137

Climate change action plan  

E-Print Network [OSTI]

Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

138

Federal Participation in LEED Christopher Payne1  

E-Print Network [OSTI]

1 Federal Participation in LEED Christopher Payne1 Beverly Dyer2 1 Environmental Energy-mail: CTPayne@lbl.gov 2 Federal Energy Management Program, U. S. Department of Energy. Phone: +1 202 586 expectations for ongoing partnership. CERTIFIED FEDERAL BUILDINGS US federal agencies have certified 16 federal

139

RECOMMENDED SECURITY CONTROLS FOR FEDERAL  

E-Print Network [OSTI]

May 2005 RECOMMENDED SECURITY CONTROLS FOR FEDERAL INFORMATION SYSTEMS: GUIDANCE FOR SELECTING COST-EFFECTIVE CONTROLS USING A RISK-BASED PROCESS Shirley Radack, Editor, Computer Security Division, Information-53, Recommended Security Controls for Federal Information Systems The basic questions that organizations should

140

History of federal transportation policy  

E-Print Network [OSTI]

History of federal transportation policy TTP 220 S. Handy 4/7/14 #12;Federal Transportation Policy · Rise of road building (1910s +) · Rise of mandated planning (1960s +) · Rise of transit funding (1960s for road building support from the start! · Cars seen as way to decentralize, to get people away from ills

Handy, Susan L.

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

for Undergraduate CHEMISTRY MAJORS  

E-Print Network [OSTI]

and Marketing, Consulting, Environmental Chemistry, Chemical Education, Chemical Engineering, ChemicalHANDBOOK for Undergraduate CHEMISTRY MAJORS DEPARTMENT OF CHEMISTRY Fall 2010 #12;#12;TABLE OF CONTENTS A Career in Chemistry - What It Means ___________________________________________ 4 What do

Stuart, Steven J.

142

MECHANICAL ENGINEERING UNDERGRADUATE MAJOR  

E-Print Network [OSTI]

HANDBOOK FOR MECHANICAL ENGINEERING UNDERGRADUATE MAJOR Old Dominion University Department of Mechanical Engineering Batten College of Engineering and Technology Norfolk, Virginia 23529-0247 #12;TABLE OF CONTENTS MECHANICAL ENGINEERING HANDBOOK

143

Applicable or relevant and appropriate requirements (ARARs) for remedial actions at the Paducah Gaseous Diffusion Plant: A compendium of environmental laws and guidance. Environmental Restoration Program  

SciTech Connect (OSTI)

Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances found at sites placed on the National Priorities List (NPL) by the US Environmental Protection Agency (EPA) must comply with applicable or relevant and appropriate requirements (ARARs) or standards under federal and state environmental laws. To date, the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant (PGDP) has not been on the NPL. Although DOE and EPA have entered into an Administrative Consent Order (ACO), the prime regulatory authority for cleanup at PGDP will be the Resource Conservation and Recovery Act (RCRA). This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at PGDP in the event that the plant becomes included on the NPL or the ACO is modified to include CERCLA cleanup. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Kentucky are listed in tables. In addition, the major provisions of RCRA, the Safe Drinking Water Act, the Clean Water Act, the Clean Air Act, and other acts, as they apply to hazardous and radioactive waste cleanup, are discussed.

Etnier, E.L.; Eaton, L.A. [Oak Ridge National Lab., TN (United States)

1992-03-01T23:59:59.000Z

144

Applicable or relevant and appropriate requirements (ARARs) for remedial actions at the Paducah Gaseous Diffusion Plant: A compendium of environmental laws and guidance  

SciTech Connect (OSTI)

Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances found at sites placed on the National Priorities List (NPL) by the US Environmental Protection Agency (EPA) must comply with applicable or relevant and appropriate requirements (ARARs) or standards under federal and state environmental laws. To date, the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant (PGDP) has not been on the NPL. Although DOE and EPA have entered into an Administrative Consent Order (ACO), the prime regulatory authority for cleanup at PGDP will be the Resource Conservation and Recovery Act (RCRA). This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at PGDP in the event that the plant becomes included on the NPL or the ACO is modified to include CERCLA cleanup. A description of the terms applicable'' and relevant and appropriate'' is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Kentucky are listed in tables. In addition, the major provisions of RCRA, the Safe Drinking Water Act, the Clean Water Act, the Clean Air Act, and other acts, as they apply to hazardous and radioactive waste cleanup, are discussed.

Etnier, E.L.; Eaton, L.A. (Oak Ridge National Lab., TN (United States))

1992-03-01T23:59:59.000Z

145

Financial statistics of major publicly owned electric utilities, 1991  

SciTech Connect (OSTI)

The Financial Statistics of Major Publicly Owned Electric Utilities publication presents summary and detailed financial accounting data on the publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with data that can be used for policymaking and decisionmaking purposes relating to publicly owned electric utility issues.

Not Available

1993-03-31T23:59:59.000Z

146

2013 Federal Energy and Water Management Award Winners | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Federal Energy and Water Management Award Winners 2013 Federal Energy and Water Management Award Winners 2013 Federal Energy and Water Management Award Winners The Federal Energy...

147

1998 federal energy and water management award winners  

SciTech Connect (OSTI)

Energy is a luxury that no one can afford to waste, and many Federal Government agencies are becoming increasingly aware of the importance of using energy wisely. Thoughtful use of energy resources is important, not only to meet agency goals, but because energy efficiency helps improve air quality. Sound facility management offers huge savings that affect the agency`s bottom line, the environment, and workplace quality. In these fiscally-modest times, pursuing sound energy management programs can present additional challenges for energy and facility managers. The correct path to take is not always the easiest. Hard work, innovation, and vision are characteristic of those who pursue energy efficiency. That is why the Department of energy, Federal Energy Management Program (FEMP) is proud to salute the winners of the 1998 Federal Energy and Water Management Award. The 1998 winners represent the kind of 21st century thinking that will help achieve widespread Federal energy efficiency. In one year, the winners, through a combination of public and private partnerships, saved more than $222 million and 10.5 trillion Btu by actively identifying and implementing energy efficiency, water conservation, and renewable energy projects. Through their dedication, hard work, ingenuity, and success, the award winners have also inspired others to increase their own efforts to save energy and water and to more aggressively pursue the use of renewable energy sources. The Federal Energy and Water Management Awards recognize the winners` contributions and ability to inspire others to take action.

NONE

1998-10-28T23:59:59.000Z

148

Reliability and the Federal Energy Regulatory Commission  

Broader source: Energy.gov [DOE]

Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—covers the Federal Energy Regulatory Commission (FERC) strategic plan, the Federal Power Act (FPA), current energy security posture, and more.

149

Federal Utility Program Overview (Fact Sheet)  

SciTech Connect (OSTI)

Fact sheet overview of the U.S. Department of Energy (DOE) Federal Energy Management Program's (FEMP) Federal Utility Program, including common contracts and services available to Federal agencies through local serving utilities.

Not Available

2009-07-01T23:59:59.000Z

150

Federal Greenhouse Gas Inventories and Performance  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program provides performance data illustrating federal agency progress in meeting the greenhouse gas reduction targets established under Executive Order (E.O.) 13514, as well as the comprehensive greenhouse gas inventories as reported by federal agencies.

151

The 1987 Federal field exercise: The DOE experience  

SciTech Connect (OSTI)

The second full-scale field exercise of the Federal Radiological Emergency Response Plan (FRERP) was held at the Zion Nuclear Power Station, Zion, Illinois, in June 1987. The exercise incorporated the annual compliance exercise for the Zion plant and involved the operating utility, Commonwealth Edison Company, the states of Illinois and Wisconsin, local governments, volunteer groups, and representatives from 12 federal agencies. The 3-day exercise was played from many locations in the Zion area; Springfield, Illinois; Madison, Wisconsin; and Washington, DC. Approximately 1000 people participated in the exercise, which used a scenario in which an accident at the plant resulted in the release of radioactive material outside the plant boundary. The US Department of Energy (DOE) had major responsibilities during the planning, playing, and critiquing of the exercise; these functions are outlined in the report. This document describes the DOE participation in the planning and response during the exercise. During a radiological emergency, the FRERP gives DOE the responsibility for coordinating the federal radiological monitoring and assessment activities in support of the states and the cognizant federal agency. At Zion, a self-sufficient Federal Radiological Monitoring and Assessment Center was established by DOE at a nearby fairground in which over 200 people from DOE, the two states, and other federal agencies participated. Before the field exercise, a tabletop exercise and a dry run were held for training purposes. 5 refs., 6 figs.

Adler, M.V.; Gant, K.S.

1989-06-01T23:59:59.000Z

152

Contract Major Report Form Name __________________________  

E-Print Network [OSTI]

Contract Major Report Form 12/1/94 Name __________________________ Degree __________________________ College __________________________ Descriptive title of contract major _______________________________________________ Current GAP is ___________ in ___________________ hours attempted. Summary of Proposed contract Major 1

Kostic, Milivoje M.

153

Nuclear facility decommissioning and site remedial actions  

SciTech Connect (OSTI)

The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

1990-09-01T23:59:59.000Z

154

Federal Environmental Law in the 'New Federalism' Era  

E-Print Network [OSTI]

As we wrote last year, the U.S. Supreme Court has shown considerable interest during the past decade in reconsidering many constitutional doctrines regarding federalism and congressional power. In a series of important ...

Glicksman, Robert L.; McAllister, Stephen R.

2000-01-01T23:59:59.000Z

155

Federal Sector Renewable Energy Project Implementation: ""What...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Presentation by...

156

Report: President's Energy Efficiency Contracting for Federal...  

Broader source: Energy.gov (indexed) [DOE]

Report: President's Energy Efficiency Contracting for Federal Buildings a Success Report: President's Energy Efficiency Contracting for Federal Buildings a Success January 8, 2014...

157

Federal Contracting Officers Guidebook | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Contracting Officers Guidebook Federal Contracting Officers Guidebook Presentation-given at the April 2012 Federal Utility Partnership Working Group (FUPWG) meeting-provides...

158

Funding Mechanisms for Federal Geothermal Permitting (Presentation)  

SciTech Connect (OSTI)

This presentation is about the GRC paper, which discusses federal agency revenues received for geothermal projects and potential federal agency budget sources for processing geothermal applications.

Witherbee, K.

2014-03-01T23:59:59.000Z

159

Working With the Federal Fleets (Presentation)  

SciTech Connect (OSTI)

Presentation about federal fleet data, working with the federal government, and results from a survey of Clean Cities coordinators about their experiences with regulated fleets.

Daley, R.

2010-10-25T23:59:59.000Z

160

2006 National Electric Transmission Congestion Study Federal...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Memorandum of Understanding Regarding Coordination in Federal...  

Office of Environmental Management (EM)

Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 Memorandum of Understanding...

162

Federal Government Energy Management Conservation Programs Reports...  

Broader source: Energy.gov (indexed) [DOE]

Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal...

163

Federal Utility Partnership Working Group Utility Partners  

Broader source: Energy.gov [DOE]

Federal Utility Partnership Working Group (FUPWG) utility partners are eager to work closely with Federal agencies to help achieve energy management goals.

164

Federal Energy Efficiency through Utility Partnerships  

SciTech Connect (OSTI)

Two-page fact sheet on FEMP's Federal Utility Program that works with federal agencies and their utilities to reduce energy use.

Not Available

2007-08-01T23:59:59.000Z

165

Federal Utility Partnership Working Group Participants  

Broader source: Energy.gov [DOE]

The following Federal agencies have participated in the Federal Utility Partnership Working Group or engaged in a utility energy service contract project.

166

Federal Government Resources - Tribal Communities | Department...  

Energy Savers [EERE]

preliminary information available regarding the tribal components of Federal Employees Health Benefits (FEHB) and Federal Employees' Group Life Insurance (FEGLI) coverage. OPM...

167

Federal Fleet Program Overview (Fact Sheet)  

SciTech Connect (OSTI)

Fact sheet overview of FEMP services and assistance available to Federal fleet managers to implement alternative fuel and advanced vehicle strategies in compliance with Federal goals and requirements.

Not Available

2010-06-01T23:59:59.000Z

168

Federal Real Property Council Guidance  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES ANDIndustrialEnergy FederalFLASH 2004-12 April 5, 2004 FederalFederal

169

Undergraduate Education DECLARATION OF MAJOR(S) / CHANGE OF ADVISOR  

E-Print Network [OSTI]

Undergraduate Education DECLARATION OF MAJOR(S) / CHANGE OF ADVISOR For Liberal Arts Students Updated 7/31/2014 Please inform your previous advisor(s) of any major or advisor changes prior A MAJOR I am declaring a major in ________________________________________________ Major advisor

Dennett, Daniel

170

DOUBLE MAJORS Imaging Science + ...  

E-Print Network [OSTI]

DOUBLE MAJORS Imaging Science + ... Applied Mathematics Biomedical Sciences Computer Science Undergraduate Research Internships and Cooperative Education (Co-op) (optional) Study Abroad WHY IMAGING SCIENCE Science: BS, MS, PhD Color Science: MS, PhD BS + MS/PhD Combos HUMAN VISION BIO- MEDICAL ASTRO- PHYSICS

Zanibbi, Richard

171

Get a major competitive  

E-Print Network [OSTI]

that energy moves things forward. + #12;Many Majors. Innovation Academy students can choose from any Information Systems Management Marketing COLLeGe OF deSIGn, COnSTruCTIOn And PLAnnInG Sustainability Engineering COLLeGe OF FIne ArTS Visual Art Studies COLLeGe OF JOurnALISm And COmmunICATIOnS Advertising

Mazzotti, Frank

172

A report to Congress on a role for federal purchasing in commercializing new energy-efficient and renewable-energy technologies  

SciTech Connect (OSTI)

The purpose of this study is to satisfy the requirements of Section 152 of the Energy Policy Act of 1992 (EPAct 92), which directs the Secretary of Energy to ``evaluate the potential use of the purchasing power of the Federal government to promote the development and commercialization of energy efficient products`` (US Congress 1992). Here, purchasing power implies a market presence by the Federal government that is large enough to influence decisions by manufacturers and suppliers about new-product introduction. In recent years, as energy use has become more efficient in the United States in both the public and private sectors, a major contributor to this transition has been the development of innovative technologies and products that reduce the use of energy and/or that use renewable forms of energy. Although the Nation`s efforts toward greater efficiency have been impressive, there are still many opportunities for the widespread introduction of even more energy-saving innovations. This report outlines the actions that DOE can take, in partnership with other Federal agencies, to address the barriers and realize the opportunities from commercializing new technologies.

NONE

1997-12-16T23:59:59.000Z

173

Federal Substance Abuse Testing Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes the requirements and responsibilities for the DOE Federal Substance Abuse Testing Program which covers drug and alcohol testing. Cancels DOE O 3792.3 Chg 1.

2014-01-30T23:59:59.000Z

174

October 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Project No. SAFT-0109 Continued on next page Standards Actions Page 2 October 2006 2.0 NON-GOVERNMENT STANDARDS ACTIONS 2.1 American National Standards Institute American...

175

July 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

were received in June 2006. Continued on next page Standards Actions Page 2 July 2005 2.0 Non-Government Standards Actions 2.1 American National Standards Institute (ANSI)...

176

Derivative actions in China   

E-Print Network [OSTI]

The enactment of derivative action was expected to be actively used by shareholders to protect their interests. In fact, it turned out that this reform effort seemed futile as the right to engage in such actions was ...

Lin, Shaowei

2014-07-02T23:59:59.000Z

177

Federal Renewable Energy Screening Assistant  

SciTech Connect (OSTI)

The Federal Renewable Energy Screening Assistant is a software tool to be used by energy auditors to prioritize future studies of potentially cost-effective renewable energy applications at federal facilities. This paper describes the structure and function of the tool, gives an inventory of renewable energy technologies represented in the tool, and briefly describes the algorithms used to rank opportunities by the savings-to-investment ratio.

Shelpuk, B [Natural Energy Resources Unlimited, Evergreen, CO (United States); Walker, A [National Renewable Energy Lab., Golden, CO (United States)

1994-10-01T23:59:59.000Z

178

2013 Better Buildings Federal Award Frequently Asked Questions  

Broader source: Energy.gov [DOE]

Document answers frequently asked questions for the Federal Energy Management Program's 2013 Better Buildings Federal Award.

179

Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation activities. (11) CAS 23-60-01, Mud Trap Drain and Outfall, will be clean closed by removing sediment from the mud trap. As a BMP, the mud trap and outfall pipe will be removed. (12) CAS 23-99-06, Grease Trap, will be clean closed by removing sediment from the grease trap and backfilling the grease trap with grout. (13) CAS 25-60-04, Building 3123 Outfalls, will be clean closed by removing contaminated soil and the sludge-containing outfall pipe.

NSTec Environmental Restoration

2011-04-30T23:59:59.000Z

180

DOE and FERC Jointly Submit Implementation Proposal for The National Action Plan on Demand Response to Congress  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required “Implementation Proposal for The National Action Plan on Demand Response.”

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Federal Regulations | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecember U.S. Department-5Federal Register NoticeFederal

182

SERVIO PBLICO FEDERAL UNIVERSIDADE FEDERAL DE SANTA CATARINA  

E-Print Network [OSTI]

. N Matrícula Nome (ordem alfabética) 1 12200001 Adriana Bertella 2 9154001 Alan Carlos Candido 3 Luiz Scalon 13 9260376 Andrei Albuquerque da Silva 14 12100473 Andressa Bocasanta 15 8166005 Angel Alfredo Plácido Moya 16 13202475 Antonio Edervaldo Pereira de Sousa #12;SERVI�O P�BLICO FEDERAL

Floeter, Sergio Ricardo

183

May 2008 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society...

184

May 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society...

185

November 2006 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National...

186

October 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National...

187

Protective Actions and Reentry  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume defines appropriate protective actions and reentry of a site following an emergency. Canceled by DOE G 151.1-4.

1997-08-21T23:59:59.000Z

188

Climate Action Plan (Kentucky)  

Broader source: Energy.gov [DOE]

The Commonwealth of Kentucky established the Kentucky Climate Action Plan Council (KCAPC) process to identify opportunities for Kentucky to respond to the challenge of global climate change while...

189

Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2004-04-06T23:59:59.000Z

190

Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal  

SciTech Connect (OSTI)

This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices.

Not Available

1994-01-01T23:59:59.000Z

191

Corrective Action Investigation Plan for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada, Rev. 0, Including Record of Technical Change No. 1  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 529, Area 25 Contaminated Materials, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. CAU 529 consists of one Corrective Action Site (25-23-17). For the purpose of this investigation, the Corrective Action Site has been divided into nine parcels based on the separate and distinct releases. A conceptual site model was developed for each parcel to address the translocation of contaminants from each release. The results of this investigation will be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2003-02-26T23:59:59.000Z

192

A transaction cost approach to unilateral presidential action  

E-Print Network [OSTI]

Presidents have two major assets at their disposal when seeking to alter policy: executive orders and legislative action. There are certain advantages and disadvantages to each course. Although presidency scholars have focused extensively...

Marchbanks, Miner Peek, III

2006-04-12T23:59:59.000Z

193

EFRC CMSNF Major Accomplishments  

SciTech Connect (OSTI)

The mission of the Center for Material Science of Nuclear Fuels (CMSNF) has been to develop a first-principles-based understanding of thermal transport in the most widely used nuclear fuel, UO2, in the presence of defect microstructure associated with radiation environments. The overarching goal within this mission was to develop an experimentally validated multiscale modeling capability directed toward a predictive understanding of the impact of radiation and fission-product induced defects and microstructure on thermal transport in nuclear fuel. Implementation of the mission was accomplished by integrating the physics of thermal transport in crystalline solids with microstructure science under irradiation through multi institutional experimental and computational materials theory teams from Idaho National Laboratory, Oak Ridge National Laboratory, Purdue University, the University of Florida, the University of Wisconsin, and the Colorado School of Mines. The Center’s research focused on five major areas: (i) The fundamental aspects of anharmonicity in UO2 crystals and its impact on thermal transport; (ii) The effects of radiation microstructure on thermal transport in UO2; (iii) The mechanisms of defect clustering in UO2 under irradiation; (iv) The effect of temperature and oxygen environment on the stoichiometry of UO2; and (v) The mechanisms of growth of dislocation loops and voids under irradiation. The Center has made important progress in each of these areas, as summarized below.

D. Hurley; Todd R. Allen

2014-09-01T23:59:59.000Z

194

Mr Schmidt, Federal Minister Schavan,  

E-Print Network [OSTI]

1 Mr Schmidt, Federal Minister Schavan, Presidents of the academies, allied organisations and responsibility. Mr Schmidt, thank you so much for taking the time to be here with us today. We are certainly `in Planck Society. In 1911, the membership fee was set at 1,000 marks a year, plus an initial contribution

Spang, Rainer

195

Institute of Technology Swiss Federal  

E-Print Network [OSTI]

Zurich Institute of Technology Swiss Federal Mathematics Applied Seminar for High Order Finite#12;nement near vertices Numerical Example: Energy Convergence for " = 10 3 and " = 10 6 eps3.eps 60. error in energy degrees of fredom Energy convergence on L-shaped domain:, s = 0.5, e = 0.001 L=0 L=2 L=4

Arnold, Anton

196

Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring, and Evaluation, FY10 Annual Report  

SciTech Connect (OSTI)

The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. The EOS is one of multiple work groups in the federal research, monitoring, and evaluation (RME) effort developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the FCRPS. The EOS is tasked by NOAA Fisheries and the Action Agencies to design and coordinate implementation of the federal RME plan for the lower Columbia River and estuary, including the plume.

Johnson, Gary E.

2010-10-26T23:59:59.000Z

197

Federal laboratories for the 21st century  

SciTech Connect (OSTI)

Federal laboratories have successfully filled many roles for the public; however, as the 21st Century nears it is time to rethink and reevaluate how Federal laboratories can better support the public and identify new roles for this class of publicly-owned institutions. The productivity of the Federal laboratory system can be increased by making use of public outcome metrics, by benchmarking laboratories, by deploying innovative new governance models, by partnerships of Federal laboratories with universities and companies, and by accelerating the transition of federal laboratories and the agencies that own them into learning organizations. The authors must learn how government-owned laboratories in other countries serve their public. Taiwan`s government laboratory, Industrial Technology Research Institute, has been particularly successful in promoting economic growth. It is time to stop operating Federal laboratories as monopoly institutions; therefore, competition between Federal laboratories must be promoted. Additionally, Federal laboratories capable of addressing emerging 21st century public problems must be identified and given the challenge of serving the public in innovative new ways. Increased investment in case studies of particular programs at Federal laboratories and research on the public utility of a system of Federal laboratories could lead to increased productivity of laboratories. Elimination of risk-averse Federal laboratory and agency bureaucracies would also have dramatic impact on the productivity of the Federal laboratory system. Appropriately used, the US Federal laboratory system offers the US an innovative advantage over other nations.

Gover, J. [Sandia National Labs., Albuquerque, NM (United States); Huray, P.G. [Univ. of South Carolina, Columbia, SC (United States)

1998-04-01T23:59:59.000Z

198

Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release and migration behavior (Pohlmann et al., 2000). The second modeling phase (known as a Data Decision Analysis [DDA]) occurred after the Nevada Division of Environmental Protection reviewed the first model and was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third modeling phase updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003).

Susan Evans

2004-11-01T23:59:59.000Z

199

2007 Federal Energy and Water Management Award Winners | Department...  

Energy Savers [EERE]

7 Federal Energy and Water Management Award Winners 2007 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals,...

200

2010 Federal Energy and Water Management Award Winners | Department...  

Energy Savers [EERE]

10 Federal Energy and Water Management Award Winners 2010 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals,...

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

2008 Federal Energy and Water Management Award Winners | Department...  

Energy Savers [EERE]

8 Federal Energy and Water Management Award Winners 2008 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals,...

202

Federal Technology Deployment Pilot: Exterior Solid State Lighting...  

Energy Savers [EERE]

Federal Technology Deployment Pilot: Exterior Solid State Lighting Federal Technology Deployment Pilot: Exterior Solid State Lighting Presentation-given at the Fall 2011 Federal...

203

Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 543, Liquid Disposal Units, is listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. CAU 543 consists of seven Corrective Action Sites (CASs) located in Areas 6 and 15 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven CASs: {sm_bullet} CAS 06-07-01, Decon Pad {sm_bullet} CAS 15-01-03, Aboveground Storage Tank {sm_bullet} CAS 15-04-01, Septic Tank {sm_bullet} CAS 15-05-01, Leachfield {sm_bullet} CAS 15-08-01, Liquid Manure Tank {sm_bullet} CAS 15-23-01, Underground Radioactive Material Area {sm_bullet} CAS 15-23-03, Contaminated Sump, Piping From January 24, 2005 through April 14, 2005, CAU 543 site characterization activities were conducted, and are reported in Appendix A of the CAU 543 Corrective Action Decision Document (CADD) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2005). The recommended corrective action as stated in the approved CADD is No Further Action for five of the CAU 543 CASs, and Closure In Place for the remaining two CASs.

NSTec Environmental Restoration

2006-09-01T23:59:59.000Z

204

Guide on Federal Employee Assistance Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide supplements the requirements and responsibilities specified in DOE O 341.1, Federal Employee Health Services, dated 12-1-03, and applies only to Federal employees. Canceled by DOE G 341.1-2A.

2003-12-01T23:59:59.000Z

205

Deployment of EVs in the Federal Fleet  

Broader source: Energy.gov [DOE]

Presentation covers the Deployment of EV's in the Federal Fleet and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

206

Energy Goals and Standards for Federal Government  

Broader source: Energy.gov [DOE]

The federal Energy Policy Act of 2005 (EPAct 2005) established several goals and standards to reduce energy use in existing and new federal buildings. Executive Order 13423, signed in January 2007...

207

Summary Report on Federal Laboratory Technology Transfer  

E-Print Network [OSTI]

Summary Report on Federal Laboratory Technology Transfer Agency Approaches; FY 2001 Activity Metrics and Outcomes 2002 Report to the President and the Congress under the Technology Transfer: FEDERAL LAB TECHNOLOGY TRANSFER TABLE OF CONTENTS LIST OF FIGURES AND TABLES

Perkins, Richard A.

208

Federal Buildings Personnel Training Act of 2010  

Broader source: Energy.gov [DOE]

On December 14, 2010, President Obama signed the Federal Buildings Personnel Training Act of 2010 into law. This legislation will have an important impact on Federal agency training programs geared...

209

The impact of federal revenue sharing on recreation and parks in Texas  

E-Print Network [OSTI]

to return power to the people and strengthen the state and local partners in our federal system. . ~ . a New Fed- eralism. " (Department of the Treasury, 1974a: 1) Revenue Sharing goes a step beyond block grants in giving states and localities autonomy... December 1974 Major Subject& Recreation and Resources Development THE Il&PACT OF FEDERAL REVENUE SHARING ON RECREATION AND PARKS IN TEXAS A Thesis by SYDNEY HENRY VERINDER Approved as to style and content by: ai . an of' Committee . ead...

Verinder, Sydney Henry

1974-01-01T23:59:59.000Z

210

Financial statistics of major US publicly owned electric utilities 1993  

SciTech Connect (OSTI)

The 1993 edition of the Financial Statistics of Major U.S. Publicly Owned Electric Utilities publication presents five years (1989 to 1993) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decision making purposes related to publicly owned electric utility issues. Generator and nongenerator summaries are presented in this publication. The primary source of publicly owned financial data is the Form EIA-412, the Annual Report of Public Electric Utilities, filed on a fiscal basis.

Not Available

1995-02-01T23:59:59.000Z

211

High Level Architecture (HLA) federation with Umbra and OPNET federates.  

SciTech Connect (OSTI)

Network-centric systems that depend on mobile wireless ad hoc networks for their information exchange require detailed analysis to support their development. In many cases, this critical analysis is best provided with high-fidelity system simulations that include the effects of network architectures and protocols. In this research, we developed a high-fidelity system simulation capability using an HLA federation. The HLA federation, consisting of the Umbra system simulator and OPNET Modeler network simulator, provides a means for the system simulator to both affect, and be affected by, events in the network simulator. Advances are also made in increasing the fidelity of the wireless communication channel and reducing simulation run-time with a dead reckoning capability. A simulation experiment is included to demonstrate the developed modeling and simulation capability.

Oppel, Fred John III; Hart, Brian; Van Leeuwen, Brian P.

2004-03-01T23:59:59.000Z

212

Federal Incentives for Water Power (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet describes the federal incentives available as of April 2013 for the development of water power technologies.

Not Available

2013-05-01T23:59:59.000Z

213

Federal Energy and Water Management Awards  

Broader source: Energy.gov [DOE]

Fact sheet for the Federal Energy and Water Management Awards, including history, legislative drivers, goals and objectives, and event details.

214

Phillip Burton Federal Building EMCS Retrofit Analysis  

E-Print Network [OSTI]

and Renewable Energy, Office of Building Technology and Community Systems, and the Federal Energy ManagementPhillip Burton Federal Building EMCS Retrofit Analysis Interim Report March 1999 Rick Diamond, Tim This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San

Diamond, Richard

215

Projected Benefits of Federal Energy Efficiency and  

E-Print Network [OSTI]

Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs FY 2008 Budget is clean, abundant, reliable, and affordable #12;Projected Benefits of Federal Energy Efficiency Coordinator: Michael Leifman o Biomass: Zia Haq, Tien Nguyen o Buildings: Jerry Dion, David Boomsma o Federal

216

RECENT TRENDS IN FEDERAL LAB TECHNOLOGY  

E-Print Network [OSTI]

Budget Resources for Federal Lab R&D Spending, Ranked by Budget Level Table 2.2 Distribution of Active#12;RECENT TRENDS IN FEDERAL LAB TECHNOLOGY TRANSFER: FY 1999­2000 BIENNIAL REPORT Report Administration U.S. Department of Commerce May 2002 #12;RECENT TRENDS IN FEDERAL LAB TECHNOLOGY TRANSFER: FY

Perkins, Richard A.

217

PROPOSED PORTHOLE FOR ASTRONOMY MAJORS Information for Astronomy Majors  

E-Print Network [OSTI]

PROPOSED PORTHOLE FOR ASTRONOMY MAJORS Information for Astronomy Majors The Astronomy Major sciences such as Astronomy, Physics, or Engineering. (Link to details on Astrophysics Concentration) The General Astronomy Concentration is intended for students who do not plan on research careers in astronomy

Richardson Jr., James E.

218

Massachusetts state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

None

1981-02-09T23:59:59.000Z

219

Current activities handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified.

none,

1981-02-27T23:59:59.000Z

220

California state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

none,

1981-02-09T23:59:59.000Z

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Pennsylvania state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

222

Maryland State information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

223

Florida state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

None

1981-02-27T23:59:59.000Z

224

Oregon state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

225

Oregon state information handbook formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

226

Iowa state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

None

1981-02-09T23:59:59.000Z

227

Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)  

SciTech Connect (OSTI)

To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

Not Available

2013-03-01T23:59:59.000Z

228

Corrective Action Investigation Plan for Corrective Action Unit 219: Septic Systems and Injection Wells, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

The Corrective Action Investigation Plan for Corrective Action Unit 219, Septic Systems and Injection Wells, has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective actions. Corrective Action Unit 219 is located in Areas 3, 16, and 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 219 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.

David A. Strand

2005-01-01T23:59:59.000Z

229

Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

NSTec Environmental Restoration

2007-07-01T23:59:59.000Z

230

Nuclear facility decommissioning and site remedial actions  

SciTech Connect (OSTI)

The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

1989-09-01T23:59:59.000Z

231

Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

Alfred Wickline

2009-04-01T23:59:59.000Z

232

August 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

August 2007 1.5 DOE Technical Standards Published No entries were received in August 2007 2.0 Non-Government Standards Actions 2.1 American National Standards Institute (ANSI)...

233

July 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

in June 2007 1.5 DOE Technical Standards Published No entries were received in June 2007 2.0 Non-Government Standards Actions 2.1 American National Standards Institute (ANSI)...

234

April 2007 Standards Actions  

Broader source: Energy.gov (indexed) [DOE]

and Injury Surveillance Program Guidelines, 03222007; DOE-STD-1190-2007, OCSH-0005 2.0 Non-Government Standards Actions 2.1 American National Standards Institute (ANSI)...

235

Climate Action Plan (Maine)  

Broader source: Energy.gov [DOE]

In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan with the goal of reducing greenhouse gas (GHG)...

236

Corrective Action Program Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

2006-03-02T23:59:59.000Z

237

DOE Encourages Utility Sector Nominations to the Federal Communication...  

Broader source: Energy.gov (indexed) [DOE]

the Federal Communications Commission's Communications, Security, Reliability, and Interoperability Council DOE Encourages Utility Sector Nominations to the Federal Communications...

238

Implementation of Executive Order 13514, Federal Leadership in...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance Implementation of Executive Order 13514, Federal Leadership in...

239

Frequently Asked Questions: About Federal Fleet Management (Brochure)  

SciTech Connect (OSTI)

Answers to frequently asked questions about Federal fleet management, Federal requirements, reporting, advanced vehicles, and alternative fuels.

Not Available

2009-10-01T23:59:59.000Z

240

Viewing biology in action | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Viewing biology in action Viewing biology in action DOE-funded pilot program will create mesoscale biological imaging platform James Evans EMSL received first-year funding of...

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

N Springs expedited response action proposal  

SciTech Connect (OSTI)

Since signing the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in 1989, the parties to the agreement have recognized the need to modify the approach to conducting investigations, studies, and cleanup actions at Hanford. To implement this approach, the parties have jointly developed the Hanford Past-Practice Strategy. The strategy defines a non-time-critical expedited response action (ERA) as a response action ``needed to abate a threat to human health or welfare or the environment where sufficient time exists for formal planning prior to initiation of response. In accordance with the past-practice strategy, DOE proposes to conduct an ERA at the N Springs, located in the Hanford 100 N Area, to substantially reduce the strontium-90 transport into the river through the groundwater pathway. The purpose of this ERA proposal is to provide sufficient information to select a preferred alternative at N Springs. The nature of an ERA requires that alternatives developed for the ERA be field ready; therefore, all the technologies proposed for the ERA should be capable of addressing the circumstances at N Springs. A comparison of these alternatives is made based on protectiveness, cost, technical feasibility, and institutional considerations to arrive at a preferred alternative. Following the selection of an alternative, a design phase will be conducted; the design phase will include a detailed look at design parameters, performance specifications, and costs of the selected alternative. Testing will be conducted as required to generate design data.

Not Available

1994-01-01T23:59:59.000Z

242

Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: #2; CAS 03-04-02, Area 3 Subdock Septic Tank #2; CAS 03-59-05, Area 3 Subdock Cesspool #2; CAS 12-59-01, Drilling/Welding Shop Septic Tanks #2; CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. #2; CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. #2; CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. #2; CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. #2; CAS 12-60-01, Drilling/Welding Shop Outfalls, contains no COCs above action levels. No further action is required for this site; however, as a BMP, three drain pipe openings will be sealed with grout.

NSTec Environmental Restoration

2009-03-31T23:59:59.000Z

243

Low-Energy Building Design Guidelines: Energy-Efficient Design for New Federal Facilities  

SciTech Connect (OSTI)

This guidebook has been prepared primarily for Federal energy managers to provide practical information for applying the principles of low-energy, whole-building design in new Federal buildings. An important objective of this guidebook is to teach energy managers how to be advocates for renewable energy and energy-efficient technologies, and how to apply specific strategies during each phase of a given project's time line. These key action items are broken out by phase and appear in abbreviated form in this guidebook.

Zachman, W.; Carlisle, N.

2001-07-19T23:59:59.000Z

244

Management of corrective action wastes pursuant to proposed Subpart S  

SciTech Connect (OSTI)

Under Section 3004(u) of the Resource Conservation and Recovery Act (RCRA), owners/operators of permitted or interim status treatment, storage, and disposal facilities (TSDFs) are required to perform corrective action to address releases of hazardous waste or hazardous constituents from solid waste management units (SWMUs). On July 27, 1990, the Environmental Protection Agency (EPA) proposed specific corrective action requirements under Part 264, Subpart S of Title 40 of the code of Federal Regulations (CFR). One portion of this proposed rule, addressing requirements applicable to corrective action management units (CAMUs) and temporary units (TUs), was finalized on February 16, 1993 (58 FR 8658 et seq.). (CAMUs and TUs are RCRA waste management units that are specifically designated for the management of corrective action wastes). Portions of the proposed Subpart S rule that address processes for the investigation and cleanup of releases to environmental media have not yet been finalized. EPA and authorized State agencies, however, are currently using the investigation and cleanup procedures of the proposed rule as a framework for implementation of RCRA`s corrective action requirements. The performance of corrective action cleanup activities generates wastes that have to be characterized and managed in accordance with applicable RCRA requirements. This Information Brief describes these requirements. It is one of a series of information Briefs on RCRA Corrective Action.

Not Available

1995-02-01T23:59:59.000Z

245

Invasive Species: Major Laws and the Role of Selected Federal Agencies  

E-Print Network [OSTI]

the globe can pose a significant threat to native animal and plant communities, and may result and nuclear power plants in the Great Lakes and the Mississippi basin. The light brown apple moth, a native species) refers to an animal or plant that is introduced into an environment where it is not native

Jawitz, James W.

246

Secretary Chu Announces Major Steps to Green The Federal Fleet | Department  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromCommentsRevolvingPerformance |inCleanUraniumDepartmentof Energy

247

Factsheet that lists the major federal incentives for water power technologies available as of April 2013.  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit|Department ofof EnergyUnited States-

248

Corrective Action Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order of 1996. This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 2000). The CAU includes two Corrective Action Sites (CASs): 25-23-09, Contaminated Waste Dump Number 1; and 25-23-03, Contaminated Waste Dump Number 2. Investigation of CAU 143 was conducted in 1999. Analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine constituents of concern for CAU 143. Radionuclide concentrations in disposal pit soil samples associated with the Reactor Maintenance, Assembly, and Disassembly Facility West Trenches, the Reactor Maintenance, Assembly, and Disassembly Facility East Trestle Pit, and the Engine Maintenance, Assembly, and Disassembly Facility Trench are greater than normal background concentrations. These constituents are identified as constituents of concern for their respective CASs. Closure-in-place with administrative controls involves use restrictions to minimize access and prevent unauthorized intrusive activities, earthwork to fill depressions to original grade, placing additional clean cover material over the previously filled portion of some of the trenches, and placing secondary or diversion berm around pertinent areas to divert storm water run-on potential.

D. L. Gustafason

2001-02-01T23:59:59.000Z

249

Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 135, Area 25 Underground Storage Tanks (USTs), which is located on the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada.

U.S. Department of Energy, Nevada Operations Office

1999-05-05T23:59:59.000Z

250

Corrective Action Investigation Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 240, Area 25 Vehicle Washdown, which is located on the Nevada Test Site (NTS).

DOE/NV

1999-01-25T23:59:59.000Z

251

Federal Energy Management Success Stories  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES ANDIndustrialEnergy Federal Efficiency ProgramDepartment ofContact

252

Federal Flood Risk Management Standard  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES ANDIndustrialEnergy Federal EfficiencyReporting & Data »

253

Federal Regulations | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehicles »Exchange Visitors ProgramEnergy Fall into SavingsFederal

254

* Milepost Federal Energy Regulatory Commission  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment( Sample of Shipment Notice) Federal Records CenterHVAC Milepost

255

2010 Federal Employee Viewpoint Survey  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment( Sample of ShipmentSimulation,Emissions from an ElectronicsFederal

256

Corrective Action Decision Document/Closure Report for Corrective Action Unit 546: Injection Well and Surface Releases Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 546, Injection Well and Surface Releases, at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended February 2008). Corrective Action Unit (CAU) 546 is comprised of two corrective action sites (CASs): • 06-23-02, U-6a/Russet Testing Area • 09-20-01, Injection Well The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation for closure of CAU 546. To achieve this, corrective action investigation (CAI) activities were performed from May 5 through May 28, 2008, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 546: Injection Well and Surface Releases, Nevada Test Site, Nevada (NNSA/NSO, 2008). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether a contaminant of concern is present at a given CAS. • Determine whether sufficient information is available to evaluate potential corrective action alternatives at each CAS. The CAU 546 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Because DQO data needs were met, and corrective actions have been implemented, it has been determined that no further corrective action (based on risk to human receptors) is necessary for the CAU 546 CASs. The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective actions are needed for CAU 546 CASs. • No Corrective Action Plan is required. • A Notice of Completion to the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 546. • Corrective Action Unit 546 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order. Analytes detected during the CAI were evaluated against final action levels established in this document. No analytes were detected at concentrations exceeding final action levels. However, contaminants of concern were presumed to be present in the subsurface soil at CAS 09-20-01. Therefore, the corrective action of close in place was selected as the preferred alternative for this CAS. Potential source material was removed from CAS 06-23-02; therefore, the corrective action of clean closure was selected as the preferred alternative at this CAS.

Alfred Wickline

2008-12-01T23:59:59.000Z

257

Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

David A. Strand

2004-06-01T23:59:59.000Z

258

Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No. 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

Robert F. Boehlecke

2004-06-01T23:59:59.000Z

259

Corrective Action Decision Document/Closure Report for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 232, Area 25 Sewage Lagoons, in accordance with the Federal Facility Agreement and Consent Order. Located at the Nevada Test Site in Nevada, approximately 65 miles northwest of Las Vegas, CAU 232 is comprised of Corrective Action Site 25-03-01, Sewage Lagoon. This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary for CAU 232. The Corrective Action Decision Document and Closure Report have been combined into one report because sample data collected during the July 1999 corrective action investigation (CAI) activities disclosed no evidence of contamination at the site. Contaminants of potential concern (COPCs) addressed during the CAI included total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, total pesticides, total herbicides, total petroleum hydrocarbons (gasoline and diesel/oil range), polychlorinated biphenyls, isotopic uranium, isotopic plutonium, strontium-90, and gamma-emitting radionuclides. The data confirmed that none of the COPCs identified exceeded preliminary action levels outlined in the CAIP; therefore, no corrective actions were necessary for CAU 232. After the CAI, best management practice activities were completed and included installation of a fence and signs to limit access to the lagoons, cementing Manhole No. 2 and the diverter box, and closing off influent and effluent ends of the sewage lagoon piping. As a result of the CAI, the DOE/NV recommended that: (1) no further actions were required; (2) no Corrective Action Plan would be required; and (3) no use restrictions were required to be placed on the CAU.

US Department of Energy Nevada Operations Office

1999-12-23T23:59:59.000Z

260

Corrective Action Decision Document/Closure Report for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.

Matthews, Patrick

2013-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Federal Control of Geological Carbon Sequestration  

SciTech Connect (OSTI)

The United States has economically recoverable coal reserves of about 261 billion tons, which is in excess of a 250-­?year supply based on 2009 consumption rates. However, in the near future the use of coal may be legally restricted because of concerns over the effects of its combustion on atmospheric carbon dioxide concentrations. In response, the U.S. Department of Energy is making significant efforts to help develop and implement a commercial scale program of geologic carbon sequestration that involves capturing and storing carbon dioxide emitted from coal-­?burning electric power plants in deep underground formations. This article explores the technical and legal problems that must be resolved in order to have a viable carbon sequestration program. It covers the responsibilities of the United States Environmental Protection Agency and the Departments of Energy, Transportation and Interior. It discusses the use of the Safe Drinking Water Act, the Clean Air Act, the National Environmental Policy Act, the Endangered Species Act, and other applicable federal laws. Finally, it discusses the provisions related to carbon sequestration that have been included in the major bills dealing with climate change that Congress has been considering in 2009 and 2010. The article concludes that the many legal issues that exist can be resolved, but whether carbon sequestration becomes a commercial reality will depend on reducing its costs or by imposing legal requirements on fossil-­?fired power plants that result in the costs of carbon emissions increasing to the point that carbon sequestration becomes a feasible option.

Reitze, Arnold

2011-04-11T23:59:59.000Z

262

Corrective Action Decision Document for Corrective Action Unit 127: Areas 25 and 26 Storage Tanks, Nevada Test Site, Nevada: Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's selection of recommended corrective action alternatives (CAAs) appropriate to facilitate the closure of Corrective Action Unit (CAU) 127: Areas 25 and 26 Storage Tanks, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 127 consists of twelve corrective action sites (CASs). Corrective action investigation (CAI) activities were performed from February 24, 2003, through May 2, 2003, with additional sampling conducted on June 6, 2003, June 9, 2003, and June 24, 2003. Analytes detected during these investigation activities were evaluated against preliminary action levels to identify contaminants of concern (COCs) for each CAS, resulting in the determination that only two of the CASs did not have COCs exceeding regulatory levels. Based on the evaluation of analytical data from the CAI, review of future and current operations in Areas 25 and 26 of the Nevada Test Site, and the detailed and comparative analysis of the potential CAAs, the following alternatives were developed for consideration: (1) No Further Action is the preferred corrective action for the two CASs (25-02-13, 26-02-01) identified with no COCs; (2) Clean Closure is the preferred corrective action for eight of the CASs (25-01-05, 25-23-11, 25-12-01, 25-01-06, 26-01-01, 26-01-02, 26-99-01, 26-23-01); and (3) Closure in Place is the preferred corrective action for the remaining two CASs (25-01-07, 25-02-02). These three alternatives were judged to meet all requirements for the technical components evaluated. Additionally, these alternatives meet all applicable state and federal regulations for closure of the sites at CAU 127 and will reduce potential future exposure pathways to the contaminated media.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2003-09-26T23:59:59.000Z

263

@Why Physics Comprehensive Physics Major.  

E-Print Network [OSTI]

@Why Physics Comprehensive Physics Major. From the basic laws of physics to the resulting emergent behavior, physics studies what the universe is made of and how it works. As a Physics major that surrounds us, to the structure and evolution of the entire universe. We offer three degrees in Physics

Yoo, S. J. Ben

264

MINISTRIO DA EDUCAO UNIVERSIDADE FEDERAL DO PARAN  

E-Print Network [OSTI]

EDUARDO VASS�O 40 63 MICHEL P. B. S. BARROSO #12;MINIST�RIO DA EDUCA��O UNIVERSIDADE FEDERAL DO PARANÁ

Paraná, Universidade Federal do

265

Sandia National Laboratories: Federal Electric Regulatory Commission...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Small Generator Interconnection Agreement Dakota Version 5.4 Released Sandia-UC Davis Collaboration Funded by DOE Office of Fusion Energy Federal Electric Regulatory...

266

Executive Order 13423: Strengthening Federal Environmental, Energy...  

Broader source: Energy.gov (indexed) [DOE]

text of Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management. eo13423.pdf More Documents & Publications Executive Order 13423-...

267

Information Security: Coordination of Federal Cyber Security...  

Broader source: Energy.gov (indexed) [DOE]

and Technology Policy establish timelines for developing a federal agenda for cyber security research. GAO also recommends that the Office of Management and Budget (OMB) issue...

268

Federal Energy Management Program (FEMP) Technical Assistance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

(FEMP) Technical Assistance Request Portal User Guide Federal Energy Management Program (FEMP) Technical Assistance Request Portal User Guide Document explains how to navigate the...

269

Federal Advisory Committee Management | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and recordkeeping requirements. DOE's Federal Advisory Committees The Department of Energy advisory committees are managed in accordance with the FACA. The Department has...

270

2010 Northwest Federal Market Assessment Report  

SciTech Connect (OSTI)

The primary intent of this market assessment is to provide insights on the effectiveness of current energy efficiency and renewable energy program offerings available to Federal sites in the region. The level of detail, quality and currency of the data used in this market assessment varies significantly by Federal agency and energy efficiency service provider. Limited access to some Federal sites, limited availability of key points of contact, time/resource constraints, and other considerations limited the total number of Federal agencies and energy efficiency service providers participating in the survey.

Scanlon, Tim; Sandusky, William F.

2011-09-01T23:59:59.000Z

271

Federal Executive Institute (FEI) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

together managers and executives from 25 to 30 Federal agencies for a unique, residential learning experience. The objective is to help agencies in the development of their career...

272

Federal Utility Partnership Working Group Meeting Chairman's...  

Broader source: Energy.gov (indexed) [DOE]

(FUPWG) meeting-lists key utility program projects and upcoming utility energy service contract (UESC) training. fupwgfall12mcandrew.pdf More Documents & Publications Federal...

273

Federal Utility Partnership Working Group Participants | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

in the Federal Utility Partnership Working Group or engaged in a utility energy service contract project. General Services Administration National Aeronautics and Space...

274

Federal Energy and Water Management Awards 2014  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

to achieving federal energy goals are evident in both the "demand side" energy management initiatives and "supply side" energy procurement best practices she has helped...

275

Federal Greenhouse Gas Inventories and Performance | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Federal Agency Progress Toward Reduction Targets Fiscal Year (FY) 2012 Greenhouse Gas Inventory: Government Totals FY 2011 Greenhouse Gas Inventory: Government Totals FY 2010...

276

Appliance Standards and Rulemaking Federal Advisory Committee...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Issuance Appliance Standards and Rulemaking Federal Advisory Committee (ASRAC) - Central Air Conditioner Regional Standards Enforcement Working Group; Notice of Open Meetings...

277

Federal Register Notice: National Nuclear Security Administration...  

Broader source: Energy.gov (indexed) [DOE]

Site-Wide Environmental Impact Statement for Sandia National Laboratories, New Mexico (SNLNM) Federal Register Notice: National Nuclear Security Administration Site-Wide...

278

Corrective Action Investigation Plan for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada (Rev. 0 / June 2003), Including Record of Technical Change No. 1  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 536 consists of a single Corrective Action Site (CAS): 03-44-02, Steam Jenny Discharge. The CAU 536 site is being investigated because existing information on the nature and extent of possible contamination is insufficient to evaluate and recommend corrective action alternatives for CAS 03-44-02. The additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating CAAs and selecting the appropriate corrective action for this CAS. The results of this field investigation are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3-2004.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2003-06-27T23:59:59.000Z

279

Paul S. Gravel Federal Internship Application Page 1 Paul S. Gravel Federal Internship Application  

E-Print Network [OSTI]

Paul S. Gravel Federal Internship Application Page 1 Paul S. Gravel Federal Internship Application Internship Application Page 2 Title or Position are you interested in participating in a summer internship

Harms, Kyle E.

280

POSITION MANAGEMENT ACTION FORM  

E-Print Network [OSTI]

POSITION MANAGEMENT ACTION FORM Workforce Planning | 408-924-2250 classcomp@sjsu.edu SJSU Human FOR POSITION MANAGEMENT FORM Workforce Planning | 408-924-2250| classcomp@sjsu.edu SJSU Human Resources Revised contact your Workforce Planning Analyst. List the name of the position this position reports to

Eirinaki, Magdalini

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Action Plan Materials Science  

E-Print Network [OSTI]

sense, including all strata) has available to it a wide range of con- venient products which improve, improving companies' pros- pects and generating wealth without harming the environment. And allAction Plan 2010-2013 Materials Science Area EXECUTIVE SUMMARY #12;N.B.: If you require any further

Fitze, Patrick

282

Federal Tax Policy Towards Energy  

E-Print Network [OSTI]

On Aug. 8, 2005, President Bush signed the Energy Policy Act of 2005 (PL 109-58). This was the first major piece of energy legislation enacted since 1992 following five years of Congressional efforts to pass energy ...

Metcalf, Gilbert E.

283

31129Federal Register / Vol. 67, No. 90 / Thursday, May 9, 2002 / Rules and Regulations The Coast Guard certifies under 5  

E-Print Network [OSTI]

the Federal Government and Indian tribes. Energy Effects We have analyzed this proposed rule under Executive Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness governments and would either preempt State law or impose a substantial direct cost of compliance on them. We

US Army Corps of Engineers

284

Corrective Action Decision Document for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether COCs are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. • No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is recommended for the remaining 10 CASs in CAU 562. • A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.

Mark Krause

2010-08-01T23:59:59.000Z

285

Fossil Fuel-Generated Energy Consumption Reduction for New Federal  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecordFederal7.pdfFlash_2010_-24.pdfOverviewPlansBuildings and Major

286

Corrective Action Decision Document/Closure Report for Corrective Action Unit 477: Area 12 N-Tunnel Muckpile, Nevada Test Site  

SciTech Connect (OSTI)

This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 477, N-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 477 is comprised of one Corrective Action Site (CAS): • 12-06-03, Muckpile The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further action, by placing use restrictions on CAU 477.

NSTec Environmental Restoration

2010-03-15T23:59:59.000Z

287

Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.:0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action alternatives.

Wickline, Alfred

2005-12-01T23:59:59.000Z

288

Corrective Action Decision Document for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended January 2007). The corrective action sites (CASs) for CAU 563 are located in Areas 3 and 12 of the Nevada Test Site, Nevada, and are comprised of the following four sites: •03-04-02, Area 3 Subdock Septic Tank •03-59-05, Area 3 Subdock Cesspool •12-59-01, Drilling/Welding Shop Septic Tanks •12-60-01, Drilling/Welding Shop Outfalls The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative (CAA) for the four CASs within CAU 563. Corrective action investigation (CAI) activities were performed from July 17 through November 19, 2007, as set forth in the CAU 563 Corrective Action Investigation Plan (NNSA/NSO, 2007). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern (COCs) for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 563 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 563 revealed the following: •CASs 03-04-02, 03-59-05, and 12-60-01 do not contain contamination at concentrations exceeding the FALs. •CAS 12-59-01 contains arsenic and chromium contamination above FALs in surface and near-surface soils surrounding a stained location within the site. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAS 12-59-01, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 563.

Grant Evenson

2008-02-01T23:59:59.000Z

289

Corrective Action Decision Document for Corrective Action Unit 254: Area 25 R-MAD Decontamination Facility, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Decision Document identifies and rationalizes the US Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 254, R-MAD Decontamination Facility, under the Federal Facility Agreement and Consent Order. Located in Area 25 at the Nevada Test Site in Nevada, CAU 254 is comprised of Corrective Action Site (CAS) 25-23-06, Decontamination Facility. A corrective action investigation for this CAS as conducted in January 2000 as set forth in the related Corrective Action Investigation Plan. Samples were collected from various media throughout the CAS and sent to an off-site laboratory for analysis. The laboratory results indicated the following: radiation dose rates inside the Decontamination Facility, Building 3126, and in the storage yard exceeded the average general dose rate; scanning and static total surface contamination surveys indicated that portions of the locker and shower room floor, decontamination bay floor, loft floor, east and west decon pads, north and south decontamination bay interior walls, exterior west and south walls, and loft walls were above preliminary action levels (PALs). The investigation-derived contaminants of concern (COCs) included: polychlorinated biphenyls, radionuclides (strontium-90, niobium-94, cesium-137, uranium-234 and -235), total volatile and semivolatile organic compounds, total petroleum hydrocarbons, and total Resource Conservation and Recovery Act (Metals). During the investigation, two corrective action objectives (CAOs) were identified to prevent or mitigate human exposure to COCs. Based on these CAOs, a review of existing data, future use, and current operations at the Nevada Test Site, three CAAs were developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Unrestricted Release Decontamination and Verification Survey; and Alternative 3 - Unrestricted Release Decontamination and Verification Survey and Dismantling of Building 3126. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors, and the preferred CAA chosen on technical merit was Alternative 2. This CAA was judged to meet all requirements for the technical components evaluated and applicable state and federal regulations for closure of the site, and reduce the potential for future exposure pathways.

U.S. Department of Energy, Nevada Operations Office

2000-06-01T23:59:59.000Z

290

Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Station (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2003-05-08T23:59:59.000Z

291

Risk Management In Major Projects   

E-Print Network [OSTI]

The integration of risk management in major projects within the construction and oil and gas industries has never been more significant especially as these projects are becoming larger and more complex. The increased ...

Baker, Scott William

292

Division of Human Resources Nonresident Alien Federal  

E-Print Network [OSTI]

Division of Human Resources Nonresident Alien Federal Withholding Requirements Questions (813) 974 classified as nonresident aliens for tax purposes with regard to their federal withholding taxes.gov. In brief, the Form W-4 requirements for individuals who are nonresident aliens (NRA) for tax purposes

Meyers, Steven D.

293

Federal Trade Commission Necesita Crdito o Seguro?  

E-Print Network [OSTI]

Comisión Federal de Comercio (Federal Trade Commission, FTC), la agencia nacional de protección del sus cuentas, es recolecta- da de su informe de crédito. A través de programas estadísticos, los a tiempo y en forma. Algunas compañías de seguros también usan la información en los informes de crédito

294

Summary Report on Federal Laboratory Technology Transfer  

E-Print Network [OSTI]

Summary Report on Federal Laboratory Technology Transfer FY 2003 Activity Metrics and Outcomes 2004 Report to the President and the Congress under the Technology Transfer and Commercialization Act Office Chapter 2. Trends in Federal Lab Technology Transfer 2.1 Cooperative Research and Development

Perkins, Richard A.

295

FEDERAL ENERGY WASHINGTON, D.C. 20426  

E-Print Network [OSTI]

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 NEWS RELEASE NEWS MEDIA CONTACT judge, the Federal Energy Regulatory Commission today ordered an expedited fact-finding hearing of the discussions. #12;Chairman Curt L. Hébert, Jr. stated as follows: "At some point, regulatory and R-01-33 (more

Laughlin, Robert B.

296

UNIVERSITY OF VIRGINIA Federation: Repurposing Scalar  

E-Print Network [OSTI]

UNIVERSITY OF VIRGINIA Federation: Repurposing Scalar Cores for Out-of-Order Execution Michael;Michael Boyer SRC TECHCON 2008 2 UNIVERSITY OF VIRGINIA Outline Motivation Overview of Federation13, r5 ld r1, 0x13 0 0 0 0 0 0 0 0 MAT 0 1 2 3 4 5 6 7 #12;Michael Boyer SRC TECHCON 2008 11

Humphrey, Marty

297

Federal Radiological Monitoring and Assessment Center  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish Department of Energy (DOE) policy, procedures, authorities, and requirements for the establishment of a Federal Radiological Monitoring and Assessment Center (FRMAC), as set forth in the Federal Radiological Emergency Response Plan (FRERP). This directive does not cancel another directive. Canceled by DOE O 153.1.

1992-12-02T23:59:59.000Z

298

Federal Waste Management www.lebensministerium.at  

E-Print Network [OSTI]

OF AGRICULTURE AND FORESTRY ENVIRONMENT AND WATER MANAGEMENT FEDERAL WASTE MANAGEMENT PLAN 2001 Issued by the Federal Ministry of Agriculture and Forestry, Environment and Water Management on June 30, 2001 #12;Note, Environment and Water Management, Division III/3 U; Stubenbastei 5, 1010 Vienna Printed and layouted by

Columbia University

299

Corrective Action Investigation Plan for Corrective Action Unit...  

Office of Scientific and Technical Information (OSTI)

Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada Re-direct Destination: Corrective Action Unit (CAU) 541 is...

300

Corrective Action Decision Document for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Airport Strainer Box, Nevada Test Site, Nevada, Rev. 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 230, Area 22 Sewage Lagoons, and CAU 320, Area 22 Desert Rock Airport Strainer Box, under the Federal Facility Agreement and Consent Order. Referred to as CAU 230/320, both CAUs are located at the Nevada Test Site (NTS) and comprise two Corrective Action Sites (CASs), 22-03-01 (Sewage Lagoons) and 22-99-01 (Strainer Box). The Area 22 Sewage Lagoons site also includes a buried Imhoff Tank, sludge bed, and associated sewer piping. A September 1999 corrective action investigation identified the only contaminant of concern above preliminary action levels at this CAU (i.e., total petroleum hydrocarbons as diesel-range organics). During this same investigation, three Corrective Action Objectives (CAOs) were identified to prevent or mitigate exposure to subsurface debris and contaminated soil. Based on these CAOs, a review of existing data, future use, and current operations in Area 22 of the NTS, three CAAs were developed for consideration: Alternative 1 - No Further Action, Alternative 2 - Closure in Place with Administrative Controls, and Alternative 3 - Excavation and Removal. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Alternative 3 was chosen on technical merit as the preferred alternative for CAU 230/320. This alternative was judged to meet all applicable state and federal regulations for closure of the site and will eliminate potential future exposure pathways to the buried debris and contaminated soils at both of the CASs within Area 22.

U.S. Department of Energy, Nevada Operations Office

2000-04-20T23:59:59.000Z

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Environmental enforcement of federal agencies: A struggle for power under the New Federalism. Master's thesis  

SciTech Connect (OSTI)

The challenge to Federalism presented by the new wave of environmental statutes is, while not unique in our history, a significant strain on state and federal relations. Behind this tension is the question of who should enforce these laws, especially when the violator is a Federal agency. Traditionally Federal agencies have been free to perform their diverse missions without restraint either from other Federal agencies or the states. This freedom has led to abuse in the arena of environmental compliance. Recent congressional hearings concerning amendments to the Resource Conservation and Recovery Act saw a congressional feeding frenzy over what was termed the abominable mess of federal facility environmental compliance. The obvious anger and frustration directed toward federal agencies, including the Environmental Protection Agency (EPA), by representatives of the states is a clear indicator of the extent of the problem and also a catalyst for an ill-conceived and dangerous legislative fix.

Surver, R.E.

1990-01-01T23:59:59.000Z

302

Corrective Action Decision Document/Closure Report for Corrective Action Unit 557: Spills and Tank Sites, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 557, Spills and Tank Sites, in Areas 1, 3, 6, and 25 of the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order. Corrective Action Unit 557 comprises the following corrective action sites (CASs): • 01-25-02, Fuel Spill • 03-02-02, Area 3 Subdock UST • 06-99-10, Tar Spills • 25-25-18, Train Maintenance Bldg 3901 Spill Site The purpose of this Corrective Action Decision Document/Closure Report is to identify and provide the justification and documentation that supports the recommendation for closure of the CAU 557 CASs with no further corrective action. To achieve this, a corrective action investigation (CAI) was conducted from May 5 through November 24, 2008. The CAI activities were performed as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 557: Spills and Tank Sites, Nevada Test Site, Nevada.

Alfred Wickline

2009-05-01T23:59:59.000Z

303

Corrective Action Decision Document/Closure Report for Corrective Action Unit 567: Miscellaneous Soil Sites Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 567 based on the implementation of the corrective actions. The corrective actions implemented at CAU 567 were developed based on an evaluation of analytical data from the CAI, the assumed presence of COCs at specific locations, and the detailed and comparative analysis of the CAAs. The CAAs were selected on technical merit focusing on performance, reliability, feasibility, safety, and cost. The implemented corrective actions meet all requirements for the technical components evaluated. The CAAs meet all applicable federal and state regulations for closure of the site. Based on the implementation of these corrective actions, the DOE, National Nuclear Security Administration Nevada Field Office provides the following recommendations: • No further corrective actions are necessary for CAU 567. • The Nevada Division of Environmental Protection issue a Notice of Completion to the DOE, National Nuclear Security Administration Nevada Field Office for closure of CAU 567. • CAU 567 be moved from Appendix III to Appendix IV of the FFACO.

Matthews, Patrick

2014-12-01T23:59:59.000Z

304

CLEMSON UNIVERSITY Sustainability Action Plan  

E-Print Network [OSTI]

.......................................................................... 8 Action Steps for Sustainability Education, Culture, and Leadership CLEMSON UNIVERSITY Sustainability Action Plan Submitted by the President's Commission on Sustainability, August 1, 2011 Version 1.0.9 #12; 1 Table of Contents President

Duchowski, Andrew T.

305

Estimating the Effects of Climate Change on Federal Hydropower and Power Marketing  

SciTech Connect (OSTI)

The U.S. Department of Energy is currently preparing an assessment of the effects of climate change on federal hydropower, as directed by Congress in Section 9505 of the Secure Water Act of 2009 (P.L. 111-11). This paper describes the assessment approach being used in a Report to Congress currently being prepared by Oak Ridge National Laboratory. The 9505 assessment will examine climate change effects on water available for hydropower operations and the future power supplies marketed from federal hydropower projects. It will also include recommendations from the Power Marketing Administrations (PMAs) on potential changes in operation or contracting practices that could address these effects and risks of climate change. Potential adaption and mitigation strategies will also be identified. Federal hydropower comprises approximately half of the U.S. hydropower portfolio. The results from the 9505 assessment will promote better understanding among federal dam owners/operators of the sensitivity of their facilities to water availability, and it will provide a basis for planning future actions that will enable adaptation to climate variability and change. The end-users of information are Congressional members, their staff, the PMAs and their customers, federal dam owners/operators, and the DOE Water Power Program.

Sale, Michael J [ORNL; Kao, Shih-Chieh [ORNL; Uria Martinez, Rocio [ORNL; Wei, Yaxing [ORNL

2011-01-01T23:59:59.000Z

306

UCF-3.001 Non-Discrimination; Affirmative Action Programs. (1) The University shall actively promote equal opportunity policies and practices  

E-Print Network [OSTI]

UCF-3.001 Non-Discrimination; Affirmative Action Programs. (1) The University shall actively, the military, ROTC, and private employers, only to the extent of state and federal requirements. (2 is defined as taking an adverse action against an individual because that individual, in good faith: (i

Wu, Shin-Tson

307

In 145 "C" Student Union: 10:00 Green Careers for Any Major  

E-Print Network [OSTI]

's Climate Action Plan Bradshaw Hovey, Building UB, bhovey@buffalo.edu http://www.buffalo.edu/ub2020_index.htm http://groundworkusa.org/ 1:00 Arctic Climate Change & UB's new Environmental Geosciences major In 145 "C" Student Union: 10:00 Green Careers for Any Major Ed Brodka, Career Services, brodka

Sachs, Frederick

308

Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada, Rev. 0 with ROTC No. 1 and ROTC No. 2  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to CAS 23-02-08. The scope of the corrective action investigation for CAU 554 includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling. (2) Perform field screening. (3) Collect and submit environmental samples for laboratory analysis to determine if contaminants of concern are present. (4) If contaminants of concern are present, collect additional step-out samples to define the extent of the contamination. (5) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this CAIP will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan.

Robert F. Boehlecke

2004-10-01T23:59:59.000Z

309

Climate Action Plan (Manitoba, Canada)  

Broader source: Energy.gov [DOE]

Manitoba's Climate Action Plan centers around energy efficiency, although it includes mandates and initiatives for renewable sources of energy.

310

Corrective Action Investigation Plan for Corrective Action Unit 565: Stored Samples, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 565 is located in Area 26 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 565 is comprised of one corrective action site (CAS) listed--CAS 26-99-04, Ground Zero Soil Samples. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend closure of CAU 565. Additional information will be obtained by conducting a corrective action investigation before evaluating closure objectives and selecting the appropriate corrective action. The results of the field investigation will support closure and waste management decisions that will be presented in the Corrective Action Decision Document/Closure Report. The site will be investigated based on the data quality objectives (DQOs) developed on June 1, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was utilized to identify and define the type, amount, and quality of data needed to develop and evaluate closure for CAU 565. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to this CAS. The scope of the corrective action investigation for CAU 565 includes the following activities: (1) Remove stored samples, shelves, and debris from the interior of Building 26-2106. (2) Perform field screening on stored samples, shelves, and debris. (3) Dispose of stored samples, shelves, and debris. (4) Collect samples of investigation-derived waste, as needed, for waste management purposes. (5) Conduct radiological surveys of Building 26-2106 in accordance with the requirements in the ''NV/YMP Radiological Control Manual'' to determine if there is residual radiological contamination that would prevent the release of the building for unrestricted use. This Corrective Action Investigation has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan.

Wickline, Alfred; McCall, Robert

2006-08-01T23:59:59.000Z

311

Federal Government Congressional Budget Office, Budget Analysis Division Washington, DC  

E-Print Network [OSTI]

Administration, Center for Drug Evaluation and Research Washington, DC Federal Energy Regulatory CommissionFederal Government Congressional Budget Office, Budget Analysis Division Washington, DC Department Environmental Protection Agency, Office of Transportation & Air Quality Ann Arbor, MI Federal Drug

Shyy, Wei

312

Federal Wind Energy Assistance through NREL (Fact Sheet)  

SciTech Connect (OSTI)

NREL assists with wind resource assessment and development activities initiated by federal agencies to facilitate distributed renewable energy projects at federal agency sites. This brief outlines the process for requesting NREL assistance with federal wind energy projects.

Not Available

2009-09-01T23:59:59.000Z

313

Emergency Water Assistance During Drought: Federal Non-Agricultural Programs  

E-Print Network [OSTI]

Emergency Water Assistance During Drought: Federal Non-Agricultural Programs Nicole T. Carter43408 #12;Emergency Water Assistance During Drought: Federal Non-Agricultural Programs Congressional Federal Authorities. If a drought's effects overwhelm state or local resources, the President

Gilbes, Fernando

314

Interim Final Rule and Request for Comments, Federal Register...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal Low-Rise Residential Buildings, which was published in the Federal Register on December 4,...

315

FEMP (Federal Energy Management Program) Update, Spring 1989  

SciTech Connect (OSTI)

The FEMP Update, published quarterly by the Federal Energy Management Program (FEMP), provides information that will assist federal managers in their energy management responsibilities. The Update is distributed primarily to federal facility and energy management personnel.

Not Available

1989-04-01T23:59:59.000Z

316

Missouri State information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

317

Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook, June 2010, Federal Energy Management Program (FEMP)  

SciTech Connect (OSTI)

Comprehensive Federal fleet management guide offered as a companion to Executive Order 13514 Section 12 guidance.

Not Available

2010-06-01T23:59:59.000Z

318

Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook, July 2011, Federal Energy Management Program (FEMP)  

SciTech Connect (OSTI)

Comprehensive Federal fleet management guide offered as a companion to Executive Order 13514 Section 12 guidance.

Not Available

2011-07-01T23:59:59.000Z

319

Closure Report for Corrective Action Unit 177: Mud Pits and Cellars Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 177: Mud Pits and Cellars, Nevada Test Site, Nevada. This Closure Report complies with the requirements of the Federal Facility Agreement and Consent Order (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The Corrective Action Sites (CASs) within CAU 177 are located within Areas 8, 9, 19, and 20 of the Nevada Test Site. The purpose of this Closure Report is to provide documentation supporting the completed corrective actions and data that confirm the corrective actions implemented for CAU 177 CASs.

Alfred Wickline

2007-02-01T23:59:59.000Z

320

Companies Hiring by Majors Booth # Organization Name Majors Recruited  

E-Print Network [OSTI]

Pont Electrical,Mechanical,Chemical 83 Eaton Corporation Electrical,Mechanical #12;Companies Hiring by Majors),Computer & Systems,Industrial,Aerospace 106 BASF Corporation Electrical,Mechanical,Civil,Chemical 86 Bayer Technology Engineering Corporation Engineering 108 Conestoga-Rovers & Associates Engineering 3/4 Conoco

Azevedo, Ricardo

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Corrective Action Investigation Plan for Corrective Action Unit 555: Septic Systems Nevada Test Site, Nevada, Rev. No.: 0 with Errata  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada, and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before the evaluation and selection of corrective action alternatives.

Pastor, Laura

2005-12-01T23:59:59.000Z

322

Money crunch looms for Federal cleanup effort  

SciTech Connect (OSTI)

In an unprecedented acknowledgement that federal facility cleanup activities face a money crunch, a federal-state advisory panel is preparing a new strategy to avert enforcement showdowns when funding cuts prevent federal agencies from meeting legally required cleanup schedules set by states. In a draft report the panel said states must recognize that some cleanup [open quotes]milestones[close quotes] will have to be delayed due to budget pressures - a concession that will be politically difficult in some states. At the same time, the panel said federal agencies must be more forthcoming in working with states and local groups to determine how increasingly scarce resources will be distributed. As a general rule, the report recommended that federal agencies and state environmental officials agree on a [open quotes]fair share[close quotes] allocation method under which the pain of a budget cutback would be spread equally among all cleanup sites within an affected federal agency. That fair share approach would be altered only if the federal agency reached agreement with states that a funding cutback could be absorbed at selected sites without affecting any cleanup milestone.

Lobsenz, G.

1992-12-03T23:59:59.000Z

323

United States National Plan of Action  

E-Print Network [OSTI]

), and Migratory Bird Treaty Act (MBTA) VI. Presidential Executive Order 13186 ­ Responsibilities of Federal

324

Regulatory and Financial Reform of Federal Research Policy: Recommenda...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Financial Reform of Federal Research Policy: Recommendations to the NRC Committee on Research Universities Regulatory and Financial Reform of Federal Research Policy:...

325

Federal Energy and Water Management Award Winners Kate Anderson...  

Energy Savers [EERE]

Federal Energy and Water Management Award Winners Kate Anderson, Scott Clark, Matthew Ellis, Vincent Guthrie, Mark Hunsickler Federal Energy and Water Management Award Winners Kate...

326

Procuring Fuel Cells for Stationary Power: A Guide for Federal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers This...

327

Potential Federal On-Site Solar Aggregation in Washington, D...  

Broader source: Energy.gov (indexed) [DOE]

Requirements * On-site Renewable Energy Purchase Overview * Washington DCMaryland Solar Options * Case Studies * Federal Interest * Q&A * Resources 2 3 Federal Renewable...

328

Combined Heat & Power Technology Overview and Federal Sector...  

Broader source: Energy.gov (indexed) [DOE]

Combined Heat & Power Technology Overview and Federal Sector Deployment Combined Heat & Power Technology Overview and Federal Sector Deployment Presentation covers the Combined...

329

New Executive Order Establishes a Federal Flood Risk Management...  

Energy Savers [EERE]

New Executive Order Establishes a Federal Flood Risk Management Standard New Executive Order Establishes a Federal Flood Risk Management Standard February 5, 2015 - 10:55am Addthis...

330

Toxic Substances Control Act Uranium Enrichment Federal Facility...  

Office of Environmental Management (EM)

Toxic Substances Control Act Uranium Enrichment Federal Facility Compliance Agreement Toxic Substances Control Act Uranium Enrichment Federal Facility Compliance Agreement Toxic...

331

Federal Employee Occupational Safety And Health (FEOSH) Program...  

Energy Savers [EERE]

Federal Employee Occupational Safety And Health (FEOSH) Program Overview Federal Employee Occupational Safety And Health (FEOSH) Program Overview Congress established Public Law...

332

Guide to Federal Financing for Energy Efficiency and Clean Energy...  

Energy Savers [EERE]

Guide to Federal Financing for Energy Efficiency and Clean Energy Deployment Guide to Federal Financing for Energy Efficiency and Clean Energy Deployment Editor's note: This guide...

333

Federal Finance Facilities Available for Energy Efficiency Upgrades...  

Energy Savers [EERE]

Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

334

Microsoft PowerPoint - Vicksburg District Federal Power Projects...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Federal Power Projects Vicksburg District Federal Power Projects Blakely Mountain Hydro DeGray Hydro DeGray Hydro Narrows Hydro Blakely Mountain Rewind Unit 1 ll Rotor...

335

Federal Register Notice: Plan for Conduct of 2012 Electric Transmissio...  

Energy Savers [EERE]

Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study...

336

Plan to Conduct Electric Transmission Congestion Study: Federal...  

Broader source: Energy.gov (indexed) [DOE]

Plan to Conduct Electric Transmission Congestion Study: Federal Register Volume 76, No. 218 - Nov. 10, 2011 Plan to Conduct Electric Transmission Congestion Study: Federal Register...

337

Federal Register Notice for Life Cycle Greenhouse Gas Perspective...  

Energy Savers [EERE]

Federal Register Notice for Life Cycle Greenhouse Gas Perspective on Exporting Liquefied Natural Gas from the United States Federal Register Notice for Life Cycle Greenhouse Gas...

338

Data Collection Requirements for the Federal Funding Accounting...  

Office of Environmental Management (EM)

Data Collection Requirements for the Federal Funding Accounting and Transparency Act (FFATA) of 2006 Data Collection Requirements for the Federal Funding Accounting and...

339

Energy Efficiency Opportunities in Federal High Performance Computing...  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Case study...

340

2013 Federal Energy and Water Management Award Winner Oak Ridge...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2013 Federal Energy and Water Management Award Winner Oak Ridge National Laboratory 2013 Federal Energy and Water Management Award Winner Oak Ridge National Laboratory Poster...

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

2014 Federal Energy and Water Management Awards: Frequently Asked...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

4 Federal Energy and Water Management Awards: Frequently Asked Questions 2014 Federal Energy and Water Management Awards: Frequently Asked Questions Document answers frequently...

342

Help with FederalReporting.gov | Department of Energy  

Energy Savers [EERE]

Help with FederalReporting.gov Help with FederalReporting.gov Frequently Asked Questions page Section 1512 of American Reinvestment and Recovery Act Outlines Recipient...

343

OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental...  

Office of Environmental Management (EM)

OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental, Energy and Economic Performance OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental, Energy...

344

White House Honors Federal Agencies for Saving Taxpayers $133...  

Office of Environmental Management (EM)

White House Honors Federal Agencies for Saving Taxpayers 133 Million in Energy Costs by Increasing Efficiency Measures White House Honors Federal Agencies for Saving Taxpayers...

345

Request for Information on Improving Performance of Federal Permitting...  

Broader source: Energy.gov (indexed) [DOE]

of Infrastructure Projects: Federal Register Notice Volume 78, No. 168 - August 29, 2013 Request for Information on Improving Performance of Federal Permitting and Review of...

346

POLICY GUIDANCE MEMORANDUM #18 Advertisement of Federal Career...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

8 Advertisement of Federal Career Intern Program Employment Opps (Expired) POLICY GUIDANCE MEMORANDUM 18 Advertisement of Federal Career Intern Program Employment Opps (Expired)...

347

German Federal Ministry for the Environment, Nature Conservation...  

Open Energy Info (EERE)

map References: German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety1 German Federal Ministry for the Environment, Nature Conservation and...

348

Meetings of the Federal Utility Partnership Working Group  

Broader source: Energy.gov [DOE]

The Federal Utility Partnership Working Group (FUPWG) meets twice per year to share success stories, information on Federal Energy Management Program activities and other business.

349

2013 Federal Energy and Water Management Award Winner Sandrine...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Sandrine Schultz 2013 Federal Energy and Water Management Award Winner Sandrine Schultz fewm13schultzhighres.pdf fewm13schultz.pdf More Documents & Publications 2013 Federal...

350

2012 Criteria and Guidelines for the Federal Energy and Water...  

Broader source: Energy.gov (indexed) [DOE]

2012 Criteria and Guidelines for the Federal Energy and Water Management Awards 2012 Criteria and Guidelines for the Federal Energy and Water Management Awards Guide covers the...

351

Notice of Availability, Federal Register, 75 FR 78231, December...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Federal Register, 75 FR 78231, December 15, 2010 Notice of availability for the Management of Energy and Water Efficiency in Federal Buildings, which was published in the...

352

Buy Energy-Efficient Products: A Guide for Federal Purchasers...  

Energy Savers [EERE]

Buy Energy-Efficient Products: A Guide for Federal Purchasers and Specifiers Buy Energy-Efficient Products: A Guide for Federal Purchasers and Specifiers Document encourages...

353

Energy-Efficient Product Procurement for Federal Agencies | Department...  

Broader source: Energy.gov (indexed) [DOE]

Energy-Efficient Product Procurement for Federal Agencies Energy-Efficient Product Procurement for Federal Agencies Brochure details the overview of the U.S. Department of Energy...

354

Expanded "Green Button" Will Reach Federal Agencies and More...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

"Green Button" Will Reach Federal Agencies and More American Energy Consumers Expanded "Green Button" Will Reach Federal Agencies and More American Energy Consumers December 6,...

355

Energy Department Partners with Industry to Train Federal Energy...  

Energy Savers [EERE]

Partners with Industry to Train Federal Energy Managers and Reduce Energy Costs Energy Department Partners with Industry to Train Federal Energy Managers and Reduce Energy Costs...

356

Energy Department Announces Federal Energy and Water Management...  

Energy Savers [EERE]

Awards Energy Department Announces Federal Energy and Water Management Awards November 6, 2013 - 3:20pm Addthis The Energy Department today recognized 25 winners across the federal...

357

Procuring Fuel Cells for Stationary Power: A Guide for Federal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Procuring Fuel Cells for Stationary Power: A Guide for Federal Decision Makers Procuring Fuel Cells for Stationary Power: A Guide for Federal Decision Makers Download presentation...

358

Cumulative Federal Payments to OE Recovery Act Recipients, through...  

Broader source: Energy.gov (indexed) [DOE]

September 30, 2014 Cumulative Federal Payments to OE Recovery Act Recipients, through September 30, 2014 Cumulative Federal Payments to OE Recovery Act Recipients, through...

359

Cumulative Federal Payments to OE Recovery Act Recipients, through...  

Broader source: Energy.gov (indexed) [DOE]

3 Cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2013 Graph of cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2013. OE...

360

Cumulative Federal Payments to OE Recovery Act Recipients, through...  

Broader source: Energy.gov (indexed) [DOE]

4 Cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2014 Cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2014. OE ARRA...

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

2015 Federal Energy and Water Management Awards: Frequently Asked...  

Energy Savers [EERE]

Frequently Asked Questions 2015 Federal Energy and Water Management Awards: Frequently Asked Questions Document answers frequently asked questions about the 2015 Federal Energy and...

362

BioGas Project Applications for Federal Agencies and Utilities  

Broader source: Energy.gov (indexed) [DOE]

Alternate Energy Systems, Inc. Natural Gas Air Blenders for BioGas Installations BioGas Project Applications for Federal Agencies and Utilities Federal Utility Partnership...

363

Guide to Federal Regulation of Sales of Imported Electricity...  

Broader source: Energy.gov (indexed) [DOE]

Federal Regulation of Sales of Imported Electricity in Canada, Mexico and the United States Guide to Federal Regulation of Sales of Imported Electricity in Canada, Mexico and the...

364

EO 13690: Establishing a Federal Flood Risk Management Standard...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EO 13690: Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input EO 13690: Establishing a Federal Flood Risk...

365

Promoting greater Federal energy productivity [Final report  

SciTech Connect (OSTI)

This document is a close-out report describing the work done under this DOE grant to improve Federal Energy Productivity. Over the four years covered in this document, the Alliance To Save Energy conducted liaison with the private sector through our Federal Energy Productivity Task Force. In this time, the Alliance held several successful workshops on the uses of metering in Federal facilities and other meetings. We also conducted significant research on energy efficiency, financing, facilitated studies of potential energy savings in energy intensive agencies, and undertook other tasks outlined in this report.

Hopkins, Mark; Dudich, Luther

2003-03-05T23:59:59.000Z

366

Determining Price Reasonableness in Federal ESPCs  

SciTech Connect (OSTI)

This document reports the findings and implementation recommendations of the Price Reasonableness Working Group to the Federal ESPC Steering Committee. The working group was formed to address concerns of agencies and oversight organizations related to pricing and fair and reasonable price determination in federal energy savings performance contracts (ESPCs). This report comprises the working group's recommendations and is the proposed draft of a training curriculum on fair and reasonable price determination for users of federal ESPCs. The report includes: (1) A review of federal regulations applicable to determining price reasonableness of federal ESPCs (section 2), (2) Brief descriptions of the techniques described in Federal Acquisition Regulations (FAR) 15.404-1 and their applicability to ESPCs (section 3), and (3) Recommended strategies and procedures for cost-effectively completing price reasonableness determinations (sections 4). Agencies have struggled with fair and reasonable price determinations in their ESPCs primarily because this alternative financing vehicle is relatively new and relatively rare in the federal sector. The methods of determining price reasonableness most familiar to federal contracting officers (price competition based on the government's design and specifications, in particular) are generally not applicable to ESPCs. The regulatory requirements for determining price reasonableness in federal ESPCs have also been misunderstood, as federal procurement professionals who are inexperienced with ESPCs are further confused by multiple directives, including Executive Order 13123, which stresses life-cycle cost-effectiveness. Uncertainty about applicable regulations and inconsistent practice and documentation among agencies have fueled claims that price reasonableness determinations have not been sufficiently rigorous in federal ESPCs or that the prices paid in ESPCs are generally higher than the prices paid for similar goods and services obtained through conventional procurements. While claims of excessive prices are largely unsubstantiated and based on anecdotal evidence, the perception that there is a problem is shared by many in the ESPC community and has been noted by auditors and oversight organizations. The Price Reasonableness Working Group determined that a more formal emphasis on FAR 15.404-1 in the ESPC process could remove much of the doubt about price reasonableness determinations. The working group's recommended consensus policy on price reasonableness stresses the price analysis techniques described in the FAR that are applicable to ESPCs and includes guidance for agencies use of these techniques in determining price reasonableness for their ESPC delivery orders. The recommended policy and guidance, if communicated to federal ESPC stakeholders, can ensure that agencies will comply with the FAR in awarding ESPCs, obtain fair and reasonable prices and best value for the government, and follow procedures that provide auditable documentation of due diligence in price reasonableness determinations.

Shonder, J.A.

2005-03-08T23:59:59.000Z

367

VIOLENT FRAMES IN ACTION  

SciTech Connect (OSTI)

We present a computational approach to radical rhetoric that leverages the co-expression of rhetoric and action features in discourse to identify violent intent. The approach combines text mining and machine learning techniques with insights from Frame Analysis and theories that explain the emergence of violence in terms of moral disengagement, the violation of sacred values and social isolation in order to build computational models that identify messages from terrorist sources and estimate their proximity to an attack. We discuss a specific application of this approach to a body of documents from and about radical and terrorist groups in the Middle East and present the results achieved.

Sanfilippo, Antonio P.; McGrath, Liam R.; Whitney, Paul D.

2011-11-17T23:59:59.000Z

368

Mitigation Action Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment SurfacesResource Program PreliminaryA3,0Statements |Mission73 4.17Mitigation Action

369

Interim Action Determination  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 U.S. Department ofAboutWAPAInterim Action

370

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIO 116 GENERAL BIOLOGY 2 Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIO 115 GENERAL BIOLOGY 1 Introductory Chemistry with labs Chemistry 107 AND INTRODUCTORY

Suzuki, Masatsugu

371

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIOL 105 GENERAL BIOLOGY II Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIOL 104 GENERAL BIOLOGY I Introductory Chemistry with labs Chemistry 107 AND INTRODUCTORY

Suzuki, Masatsugu

372

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIO 1580 PRINCIPLES OF BIOLOGY II Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIO 1570 PRINCIPLES OF BIOLOGY I Introductory Chemistry with labs Chemistry 107

Suzuki, Masatsugu

373

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIO 102 GENERAL BIOLOGY II Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIO 101 GENERAL BIOLOGY I Introductory Chemistry with labs Chemistry 107 AND INTRODUCTORY

Suzuki, Masatsugu

374

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIOL 117 + BIOL 118 GENERAL BIOLOGY II and LAB Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIOL 115 + BIOL 116 GENERAL BIOLOGY I and LAB Introductory Chemistry

Suzuki, Masatsugu

375

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BI 202 GENERAL BIOLOGY II Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BI 201 GENERAL BIOLOGY I Introductory Chemistry with labs Chemistry 107 AND INTRODUCTORY CHEMISTRY

Suzuki, Masatsugu

376

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIO 152 GENERAL BIOLOGY I Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIO 151 GENERAL BIOLOGY II Introductory Chemistry with labs Chemistry 107 AND INTRODUCTORY

Suzuki, Masatsugu

377

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIO 156 GENERAL BIOLOGY II Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIO 155 GENERAL BIOLOGY I Introductory Chemistry with labs Chemistry 107 AND INTRODUCTORY

Suzuki, Masatsugu

378

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIOL 1520 GENERAL BIOLOGY II Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIOL 1510 GENERAL BIOLOGY I Introductory Chemistry with labs Chemistry 107 AND INTRODUCTORY

Suzuki, Masatsugu

379

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIO 152 / BY 52 MODERN BIOLOGY II Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIO 150 / BY 50 MODERN BIOLOGY I Introductory Chemistry with labs Chemistry 107

Suzuki, Masatsugu

380

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIO 220 BIOLOGY II Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIO 210 BIOLOGY I Introductory Chemistry with labs Chemistry 107 AND INTRODUCTORY CHEMISTRY I CHE 201

Suzuki, Masatsugu

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIOL 102 GENERAL BIOLOGY II Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIOL 101 GENERAL BIOLOGY I Introductory Chemistry with labs Chemistry 107 AND INTRODUCTORY

Suzuki, Masatsugu

382

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIO 110 PRINCIPLES OF BIOLOGY II Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIO 109 PRINCIPLES OF BIOLOGY I Introductory Chemistry with labs Chemistry 107

Suzuki, Masatsugu

383

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY SC 139 INTRODUCTORY BIOLOGY: ANIMALS AND PLANTS Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY SC 135 INTRODUCTORY BIOLOGY: MOLECULES AND CELLS Introductory Chemistry

Suzuki, Masatsugu

384

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIO 117 PRINCIPLES OF BIOLOGY I Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIO 118 PRINCIPLES OF BIOLOGY II Introductory Chemistry with labs Chemistry 107

Suzuki, Masatsugu

385

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIO 132 PRINCIPLES OF BIOLOGY 2 Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIO 131 PRINCIPLES OF BIOLOGY 1 Introductory Chemistry with labs Chemistry 107

Suzuki, Masatsugu

386

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BI 102 GENERAL BIOLOGY II Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BI 101 GENERAL BIOLOGY I Introductory Chemistry with labs Chemistry 107 AND INTRODUCTORY CHEMISTRY

Suzuki, Masatsugu

387

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIO 01400 GENERAL BIOLOGY II Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BIO 01300 GENERAL BIOLOGY I Introductory Chemistry with labs Chemistry 107 AND INTRODUCTORY

Suzuki, Masatsugu

388

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BIO 106H GENERAL BIOLOGY II HONORS Biology 118 INTRODUCTION TO CELLULAR AND MOLECULAR BIOLOGY BIO 105H GENERAL BIOLOGY I HONORS Introductory Chemistry with labs Chemistry 107

Suzuki, Masatsugu

389

BIOLOGY MAJOR First two years  

E-Print Network [OSTI]

BIOLOGY MAJOR First two years Introductory Biology with labs Biology 117 AND INTRODUCTION TO ORGANISMAL AND POPULATION BIOLOGY BI 102 GENERAL BIOLOGY 2 Biology 118 INTRODUCTION TO CELL AND MOLECULAR BIOLOGY BI 101 GENERAL BIOLOGY 1 Introductory Chemistry with labs Chemistry 107 AND INTRODUCTORY CHEMISTRY

Suzuki, Masatsugu

390

Majoring in Forest Resources & Conservation  

E-Print Network [OSTI]

and management. The program emphasizes sustainable, multiple-use management and includes substantial field work work, etc.) Fall FNR 4624C Field Operations for Management of Ecosystems 3 credits FNR 4660 NaturalMajoring in Forest Resources & Conservation Specialization: Forest Resource Management Forest

Hill, Jeffrey E.

391

Majoring in Forest Resources & Conservation  

E-Print Network [OSTI]

-use management and includes substantial field work and group projects. Summer B FOR3200C Foundations in NaturalMajoring in Forest Resources & Conservation Specialization: Watershed Science & Management Watershed Science & Management prepares students to address the many management issues associated with water

Hill, Jeffrey E.

392

Dirichlet polynomials, Majorization, and Trumping  

E-Print Network [OSTI]

Majorization and trumping are two partial orders which have proved useful in quantum information theory. We show some relations between these two partial orders and generalized Dirichlet polynomials, Mellin transforms, and completely monotone functions. These relations are used to prove a succinct generalization of Turgut's characterization of trumping.

Rajesh Pereira; Sarah Plosker

2013-12-11T23:59:59.000Z

393

Corrective action decision document, Second Gas Station, Tonopah test range, Nevada (Corrective Action Unit No. 403)  

SciTech Connect (OSTI)

This Corrective Action Decision Document (CADD) for Second Gas Station (Corrective Action Unit [CAU] No. 403) has been developed for the U.S. Department of Energy`s (DOE) Nevada Environmental Restoration Project to meet the requirements of the Federal Facility Agreement and Consent Order (FFACO) of 1996 as stated in Appendix VI, {open_quotes}Corrective Action Strategy{close_quotes} (FFACO, 1996). The Second Gas Station Corrective Action Site (CAS) No. 03-02-004-0360 is the only CAS in CAU No. 403. The Second Gas Station CAS is located within Area 3 of the Tonopah Test Range (TTR), west of the Main Road at the location of former Underground Storage Tanks (USTs) and their associated fuel dispensary stations. The TTR is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air and approximately 56 km (35 mi) southeast of Tonopah, Nevada, by road. The TTR is bordered on the south, east, and west by the Nellis Air Force Range and on the north by sparsely populated public land administered by the Bureau of Land Management and the U.S. Forest Service. The Second Gas Station CAS was formerly known as the Underground Diesel Tank Site, Sandia Environmental Restoration Site Number 118. The gas station was in use from approximately 1965 to 1980. The USTs were originally thought to be located 11 meters (m) (36 feet [ft]) east of the Old Light Duty Shop, Building 0360, and consisted of one gasoline UST (southern tank) and one diesel UST (northern tank) (DOE/NV, 1996a). The two associated fuel dispensary stations were located northeast (diesel) and southeast (gasoline) of Building 0360 (CAU 423). Presently the site is used as a parking lot, Building 0360 is used for mechanical repairs of vehicles.

NONE

1997-11-01T23:59:59.000Z

394

Corrective Action Decision Document/Closure Report for Corrective Action Unit 383: Area E-Tunnel Sites, Nevada Test Site  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is the joint responsibility of DTRA and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense. Corrective Action Unit 383 is comprised of three Corrective Action Sites (CASs) and two adjacent areas: • CAS 12-06-06, Muckpile • CAS 12-25-02, Oil Spill • CAS 12-28-02, Radioactive Material • Drainage below the Muckpile • Ponds 1, 2, and 3 The purpose of this CADD/CR is to provide justification and documentation to support the recommendation for closure with no further corrective action, by placing use restrictions at the three CASs and two adjacent areas of CAU 383.

NSTec Environmental Restoration

2010-03-15T23:59:59.000Z

395

Corrective action investigation plan for Corrective Action Unit 340, Pesticide Release Sites, Nevada Test Site, Nye County, Nevada  

SciTech Connect (OSTI)

This Correction Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. As required by the FFACO (1996), this document provides or references all of the specific information for planning investigation activities associated with three Corrective Action Sites (CASs) located at the Nevada Test Site (NTS). These CASs are collectively known as Corrective Action Unit (CAU) 340, Pesticide Release Sites. According to the FFACO, CASs are sites that may require corrective action(s) and may include solid waste management units or individual disposal or release sites. These sites are CAS 23-21-01, Area 23 Quonset Hut 800 (Q800) Pesticide Release Ditch; CAS 23-18-03, Area 23 Skid Huts Pesticide Storage; and CAS 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage (Q15-11). The purpose of this CAIP for CAU 340 is to direct and guide the investigation for the evaluation of the nature and extent of pesticides, herbicides, and other contaminants of potential concern (COPCs) that were stored, mixed, and/or disposed of at each of the CASs.

NONE

1998-01-01T23:59:59.000Z

396

Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 371 is located in Areas 11 and 18 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 371 is comprised of the two corrective action sites (CASs) listed below: • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 19, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 371. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 371 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Measure in situ external dose rates using thermoluminescent dosimeters or other dose measurement devices. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates. • Combine internal and external dose rates to determine whether total dose rates exceed final action levels (FALs). • Collect and submit environmental samples for laboratory analysis to determine whether chemical contaminants are present at concentrations exceeding FALs. • If contamination exceeds FALs, define the extent of the contamination exceeding FALs. • Investigate waste to determine whether potential source material is present. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy; and U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

Patrick Matthews

2009-02-01T23:59:59.000Z

397

Corrective Action Plan for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Airport Strainer Box, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

The purpose of this Corrective Action Plan (CAP) is to provide the strategy and methodology to close the Area 22 Sewage Lagoons site. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was done during September 1999, Soil samples were collected using a direct-push method and a backhoe. Soil samples were collected from the sludge bed, sewage lagoons, strainer box, and Imhoff tank areas. Characterization of the manholes associated with the septic system leading to the Imhoff tank was done during March 2000. The results of the characterization were reported in the Corrective Action Decision Document (CADD) (DOE/NV, 2000). Soil sample results indicated that the only constituent of concern (COC) detected above Preliminary Action Levels (PALs) was total petroleum hydrocarbons (TPH) as diesel-range organics. This COC was detected in three samples from the sludge bed at concentrations up to 580 milligrams per kilogram (mg/kg). This exceeds the Nevada Division of Environmental Protection (NDEP) regulatory action level for TPH of 100 mg/kg (Nevada Administrative Code, 1996). Excavation of the area during characterization uncovered asphalt debris, four safety poles, and strands of barbed wire. The TPH-impacted soil and debris will be removed and disposed in the NTS Area 6 Hydrocarbon Landfill.

D. S. Tobiason

2000-09-01T23:59:59.000Z

398

Major Communications Reports | Department of Energy  

Office of Environmental Management (EM)

Major Communications Reports Major Communications Reports May 18, 2012 Green Button Data: More Power to You May 28, 2009 Major Communications Report May 28, 2009 May 7, 2009 Major...

399

REMEDIAL ACTION PLAN  

E-Print Network [OSTI]

designated site consists of the 111-acre tailings pile, the mill yard, and piles of demolition rubble awaiting burial. The site contains 2.659 million cubic yards of tailings including 277,000 cubic yards of contaminated material in the mill yard, ore storage area, and Ann Lee Mine area; 151,000 cubic yards in the protore storage and leach pad areas; and 664,000 cubic yards of windblown contaminated soil, including excess soil that would result from excavation. Remedial action The remedial action will start with the excavation of windblown contaminated material and placement around the west, south, and east sides of the pile to buttress the slopes for increased stability. Most of the demolition rubble will be placed in the southern part of the pile and be covered with tailings. The northern part of the tailings pile (one million cubic yards) will then be excavated and placed on the south part of the pile to reduce the size of the disposal cell footprint. Demolition rubble that

Inactive Uranium; Mill Tailings Site; Uranium Mill Tremedial

1990-01-01T23:59:59.000Z

400

Affirmative Action Plan, October 1991--September 1992  

SciTech Connect (OSTI)

This report documents Reynolds Electrical Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the Handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations. All personnel decisions are made at the Company level. Decisions regarding the General Manager or Deputy General Manager are made at the corporate level.

Not Available

1991-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

2013 Alaska Federation of Natives Convention  

Broader source: Energy.gov [DOE]

The Alaska Federation of Natives (AFN) Convention is the largest representative annual gathering in the United States of any Native peoples. Delegates are elected on a population formula of one...

402

Alaska Federation of Natives Annual Convention  

Broader source: Energy.gov [DOE]

The Alaska Federation of Natives (AFN) Convention is the largest representative annual gathering in the United States of any Native peoples. Delegates are elected on a population formula of one...

403

Federal Incentives for Wind Power (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet describes the federal incentives available as of April 2013 that encourage increased development and deployment of wind energy technologies, including research grants, tax incentives, and loan programs.

Not Available

2013-05-01T23:59:59.000Z

404

2014 National Small Business Federal Contracting Summit  

Broader source: Energy.gov [DOE]

2014 National Small Business Federal Contracting Summit - DC Summer Conference presented jointly by the U.S. Women's Chamber of Commerce and the American Small Business Chamber of Commerce /...

405

Federal Utility Partnership Working Group Industry Commitment...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

utility industry members of the Edison Electric Institute pledge to assist Federal agencies in achieving energy-saving goals. These goals are set in the Energy Policy Act of...

406

Federal Utility Partnership Working Group Industry Commitment  

Broader source: Energy.gov [DOE]

Investor-owned electric utility industry members of the Edison Electric Institute pledge to assist Federal agencies in achieving energy-saving goals. These goals are set in the Energy Policy Act of...

407

Better Buildings Federal Award 2012 Competition | Department...  

Office of Environmental Management (EM)

Federal Government's highest-performing buildings through a competition to reduce annual energy use intensity (Btu per square foot of facility space) on a year-over-year basis....

408

Better Buildings Federal Award 2013 Competition | Department...  

Broader source: Energy.gov (indexed) [DOE]

Federal Government's highest-performing buildings through a competition to reduce annual energy use intensity (Btu per square foot of facility space) on a year-over-year basis....

409

Federal Staffing Guide for Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides an approach to determining the appropriate level and type of federal personnel needed to effectively plan, direct, and oversee project execution. Superseded by DOE G 413.3-19 Admin Chg 1.

2010-06-03T23:59:59.000Z

410

Guide on Federal Employee Occupational Medical Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide supplements the requirements and responsibilities specified in DOE O 341.1, Federal Employee Health Services, dated 12-1-03. This Guide provides preferred implementing methods and procedures. Canceled by DOE G 341.1-1A.

2003-12-01T23:59:59.000Z

411

ANALYSIS OF CHP POTENTIAL AT FEDERAL SITES  

SciTech Connect (OSTI)

This document was prepared at the request of the U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP) under its Technical Guidance and Assistance and Project Financing Programs. The purpose was to provide an estimate of the national potential for combined heat and power (also known as CHP; cogeneration; or cooling, heating, and power) applications at federal facilities and the associated costs and benefits including energy and emission savings. The report provides a broad overview for the U.S. Department of Energy (DOE) and other agencies on when and where CHP systems are most likely to serve the government's best interest. FEMP's mission is to reduce the cost to and environmental impact of the federal government by advancing energy efficiency and water conservation, promoting the use of renewable energy, and improving utility management decisions at federal sites. FEMP programs are driven by its customers: federal agency sites. FEMP monitors energy efficiency and renewable energy technology developments and mounts ''technology-specific'' programs to make technologies that are in strong demand by agencies more accessible. FEMP's role is often one of helping the federal government ''lead by example'' through the use of advanced energy efficiency/renewable energy (EERE) technologies in its own buildings and facilities. CHP was highlighted in the Bush Administration's National Energy Policy Report as a commercially available technology offering extraordinary benefits in terms of energy efficiencies and emission reductions. FEMP's criteria for emphasizing a technology are that it must be commercially available; be proven but underutilized; have a strong constituency and momentum; offer large energy savings and other benefits of interest to federal sites and FEMP mission; be in demand; and carry sufficient federal market potential. As discussed in the report, CHP meets all of these criteria. Executive Order 13123 directs federal facilities to use CHP when life-cycle costs indicate energy reduction goals will be met. FEMP can assist facilities to conduct this analysis. The model developed for this report estimates the magnitude of CHP that could be implemented under various performance and economic assumptions associated with different applications. This model may be useful for other energy technologies. It can be adapted to estimate the market potential in federal buildings for any energy system based on the cost and performance parameters that a user desires to assess. The model already incorporates a standard set of parameters based on available data for federal buildings including total building space, building type, energy use intensity, fuel costs, and the performance of many prime movers commonly used in CHP applications. These and other variables can be adjusted to meet user needs or updated in the future as new data become available.

HADLEY, S.W.

2002-03-11T23:59:59.000Z

412

UNIVERSIDADE FEDERAL DO PARANA GUILHERME BERTOLDO  

E-Print Network [OSTI]

UNIVERSIDADE FEDERAL DO PARAN´A GUILHERME BERTOLDO SOLUC¸ ~AO NUM´ERICA DA EQUAC¸ ~AO DE BOLTZMANN de P´os-Gradua¸c~ao em F´isica do Setor de Ci^encias Exatas da Universi- dade Federal do Paran fornecidos pelo potencial de esferas r´igidas e de Lennard-Jones. Verificou-se que o desvio relativo destes

Sharipov, Felix

413

Corrective Action Decision Document for Corrective Action Unit 224: Decon Pad and Septic Systems Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, in Areas 2, 3, 5, 6, 11, and 23 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 224 is comprised of the following corrective action sites (CASs): (1) 02-04-01, Septic Tank (Buried); (2) 03-05-01, Leachfield; (3) 05-04-01, Septic Tanks (4)/Discharge Area; (4) 06-03-01, Sewage Lagoons (3); (5) 06-05-01, Leachfield; (6) 06-17-04, Decon Pad and Wastewater Catch; (7) 06-23-01, Decon Pad Discharge Piping; (8) 11-04-01, Sewage Lagoon; and (9) 23-05-02, Leachfield. The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative for the nine CASs within CAU 224. Corrective action investigation activities were performed from August 10, 2004, through January 18, 2005, as set forth in the CAU 224 Corrective Action Investigation Plan.

David A. Strand

2005-05-01T23:59:59.000Z

414

Corrective Action Investigation Plan for Corrective Action Unit 516: Septic Systems and Discharge Points, Nevada Test Site, Nevada, Rev. 0, Including Record of Technical Change No. 1  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Sites Office's (NNSA/NSO's) approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. CAU 516 consists of six Corrective Action Sites: 03-59-01, Building 3C-36 Septic System; 03-59-02, Building 3C-45 Septic System; 06-51-01, Sump Piping, 06-51-02, Clay Pipe and Debris; 06-51-03, Clean Out Box and Piping; and 22-19-04, Vehicle Decontamination Area. Located in Areas 3, 6, and 22 of the NTS, CAU 516 is being investigated because disposed waste may be present without appropriate controls, and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. Existing information and process knowledge on the expected nature and extent of contamination of CAU 516 are insufficient to select preferred corrective action alternatives; therefore, additional information will be obtained by conducting a corrective action investigation. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3/2004.

U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Sites Office

2003-04-28T23:59:59.000Z

415

Corrective Action Decision Document/Closure Report for Corrective Action Unit 476: Area 12 T-Tunnel Muckpile, Nevada Test Site  

SciTech Connect (OSTI)

This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 476, Area 12 T-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 476 is comprised of one Corrective Action Site (CAS): • 12-06-02, Muckpile The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictions for CAU 476.

NSTec Environmental Restoration

2010-03-15T23:59:59.000Z

416

Corrective Action Decision Document/Closure Report for Corrective Action Unit 478: Area 12 T-Tunnel Ponds, Nevada Test Site  

SciTech Connect (OSTI)

This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 478, Area 12 T-Tunnel Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 478 is comprised of one corrective action site (CAS): • 12-23-01, Ponds (5) RAD Area The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictions for CAU 478.

NSTec Environmental Restoration

2010-03-15T23:59:59.000Z

417

Corrective Action Decision Document/Closure Report for Corrective Action Unit 559: T Tunnel Compressor/Blower Pad, Nevada Test Site  

SciTech Connect (OSTI)

This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 559, T-Tunnel Compressor/Blower Pad. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 559 is comprised of one Corrective Action Site (CAS): • 12-25-13, Oil Stained Soil and Concrete The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictions for CAU 559.

NSTec Environmental Restoration

2010-03-15T23:59:59.000Z

418

Corrective Action Investigation Plan for Corrective Action Unit 190: Contaminated Waste Sites Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 190 is located in Areas 11 and 14 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 190 is comprised of the four Corrective Action Sites (CASs) listed below: (1) 11-02-01, Underground Centrifuge; (2) 11-02-02, Drain Lines and Outfall; (3) 11-59-01, Tweezer Facility Septic System; and (4) 14-23-01, LTU-6 Test Area. These sites are being investigated because existing information is insufficient on the nature and extent of potential contamination to evaluate and recommend corrective action alternatives. Additional information will be obtained before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS by conducting a corrective action investigation (CAI). The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on August 24, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture, and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 190. The scope of the CAU 190 CAI includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling; (2) Conduct radiological and geophysical surveys; (3) Perform field screening; (4) Collect and submit environmental samples for laboratory analysis to determine whether contaminants of concern (COCs) are present; (5) If COCs are present, collect additional step-out samples to define the lateral and vertical extent of the contamination; (6) Collect samples of source material, if present, to determine the potential for a release; (7) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes; and (8) Collect quality control samples. This Corrective Action Investigation Document (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, U.S. Department of Energy, and U.S. Department of Defense. Under the FFACO, this CAIP will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval.

Wickline, Alfred

2006-12-01T23:59:59.000Z

419

Corrective Action Investigation Plan for Corrective Action Unit 309: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 309, Area 12 Muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD). Corrective Action Unit 309 is located in Area 12 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 mi beyond the main gate to the NTS. Corrective Action Unit 309 is comprised of the three Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: CAS 12-06-09, Muckpile; CAS 12-08-02, Contaminated Waste Dump (CWD); and CAS 12-28-01, I, J, and K-Tunnel Debris. Corrective Action Sites 12-06-09 and 12-08-02 will be collectively referred to as muckpiles in this document. Corrective Action Site 12-28-01 will be referred to as the fallout plume because of the extensive lateral area of debris and fallout contamination resulting from the containment failures of the J-and K-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and media sampling, where appropriate. Data will also be obtained to support waste management decisions. The CASs in CAU 309 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and/or the environment. Existing information on the nature and extent of potential contamination at these sites are insufficient to evaluate and recommend corrective action alternatives for the CASs. Therefore, additional information will be obtained by conducting a CAI prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS.

David A. Strand

2004-12-01T23:59:59.000Z

420

Federal Register / Vol. 59, No. 2 / Tuesday, January 4, 1994 / Notices and operated federal laboratories,  

E-Print Network [OSTI]

laboratories, including NIST, to enter into cooperative research and development, agreements (CRADAs) with qualified parties. Under the law, a CRADA may provide for contributions from the federal laboratory

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Federal Technology Alert: Ground-Source Heat Pumps Applied to Federal Facilities--Second Edition  

SciTech Connect (OSTI)

This Federal Technology Alert, which was sponsored by the U.S. Department of Energy's Office of Federal Energy Management Programs, provides the detailed information and procedures that a Federal energy manager needs to evaluate most ground-source heat pump applications. This report updates an earlier report on ground-source heat pumps that was published in September 1995. In the current report, general benefits of this technology to the Federal sector are described, as are ground-source heat pump operation, system types, design variations, energy savings, and other benefits. In addition, information on current manufacturers, technology users, and references for further reading are provided.

Hadley, Donald L.

2001-03-01T23:59:59.000Z

422

Guidance for Federal Agencies on E.O. 13514 Section 12, Federal...  

Office of Environmental Management (EM)

step in a recommended process for Federal agency fleet managers to select optimal petroleum reduction strategies as required under Executive Order (E.O.) 13514....

423

Increasing Federal Office Building Water Efficiency, Federal Energy Management Program (FEMP) (Fact Sheet)  

SciTech Connect (OSTI)

Quick guide to increasing Federal office building water efficiency, water management planning, performing a water audit, calculating a water balance, and best management practices.

Not Available

2010-04-01T23:59:59.000Z

424

Corrective Action Investigation Plan for Corrective Action Unit...  

Office of Scientific and Technical Information (OSTI)

Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada Re-direct Destination: Temp Data Fields Matthews, Patrick...

425

Hazardous Waste Remedial Actions Program annual progress report, FY 1990  

SciTech Connect (OSTI)

The Hazardous Waste Remedial Actions Programs (HAZWRAP), a unit of Martin Marietta Energy Systems, Inc., supports the Department of Energy (DOE) Oak Ridge Operations Office in broadly environmental areas, especially those relating to waste management and environmental restoration. HAZWRAP comprises six program areas, which are supported by central administrative and technical organizations. Existing programs deal with airborne hazardous substances, pollution prevention, remedial actions planning, environmental restoration, technology development, and information and data systems. HAZWRAP's mission to develop, promote, and apply-cost-effective hazardous waste management and environmental technologies to help solve national problems and concerns. HAZWRAP seeks to serve as integrator for hazardous waste and materials management across the federal government. It applies the unique combination of research and development (R D) capabilities, technologies, management expertise, and facilities in the Energy Systems complex to address problems of national importance. 24 figs., 10 tabs.

Not Available

1990-12-01T23:59:59.000Z

426

Philadelphia, Pennsylvania: Solar in Action (Brochure), Solar...  

Broader source: Energy.gov (indexed) [DOE]

Philadelphia, Pennsylvania: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Philadelphia, Pennsylvania: Solar in Action (Brochure),...

427

Corrective Action Decision Document for Corrective Action Unit 5: Landfills, Nevada Test Site, Nevada: Revision No. 0 (with Record of Technical Change No. 1)  

SciTech Connect (OSTI)

This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action (CAU) 5: Landfills, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Areas 5, 6, 12, 20, and 23 of the NTS, CAU 5 is comprised of eight corrective action sites (CASs). The corrective action investigation (CAI) of CAU 5 was conducted from October 7, 2002 through January 30, 2003, with geophysical surveys completed from March 6 through May 8, 2002, and topographic surveys conducted from March 11 through April 29, 2003. Contaminants of concern (COCs) were identified only at CAS 12-15-01. Those COCs included total petroleum hydrocarbons and volatile organic compounds. Based on the evaluation of analytical data from the CAI, review of future and current operations in Areas 5, 6, 12, 20, and 23 of the Nevada Test Site, and the detailed and comparative analysis of the potential CAAs, the following single alternative was developed for consideration. Close in Place with Administrative Controls is the recommended alternative for all of the CASs in CAU 5. This alternative was judged to meet all requirements for the technical components evaluated. Additionally, the alternative meets all applicable state and federal regulations for closure of the sites and will eliminate inadvertent intrusion into landfills at CAU 5.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2003-10-24T23:59:59.000Z

428

Guam Energy Action Plan  

SciTech Connect (OSTI)

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

429

Operations and Maintenance for Major Equipment Types  

Broader source: Energy.gov [DOE]

Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

430

Federal Response Assets for a Radioactive Dispersal Device Incident  

SciTech Connect (OSTI)

If a large scale RDD event where to occur in New York City, the magnitude of the problem would likely exceed the capabilities of City and State to effectively respond to the event. New York State could request Federal Assistance if the United States President has not already made the decision to provide it. The United States Federal Government has a well developed protocol to respond to emergencies. The National Response Framework (NRF) describes the process for responding to all types of emergencies including RDD incidents. Depending on the location and type of event, the NRF involves appropriate Federal Agencies, e.g., Department of Homeland Security (DHS), the Department of Energy (DOE), Environmental Protection Agency (EPA), United States Coast Guard (USCG), Department of Defense (DOD), Department of Justice (DOJ), Department of Agriculture (USDA), and Nuclear Regulatory Commission (NRC). The Federal response to emergencies has been refined and improved over the last thirty years and has been tested on natural disasters (e.g. hurricanes and floods), man-made disasters (oil spills), and terrorist events (9/11). However, the system has never been tested under an actual RDD event. Drills have been conducted with Federal, State, and local agencies to examine the initial (early) phases of such an event (TopOff 2 and TopOff 4). The Planning Guidance for Protection and Recovery Following Radiological Dispersal Device (RDD) and Improvised Nuclear Device (IND) incidents issued by the Department of Homeland Security (DHS) in August 2008 has never been fully tested in an interagency exercise. Recently, another exercise called Empire 09 that was situated in Albany, New York was conducted. Empire 09 consists of 3 different exercises be held in May and June, 2009. The first exercise, May 2009, involved a table top exercise for phase 1 (0-48 hours) of the response to an RDD incident. In early June, a full-scale 3- day exercise was conducted for the mid-phase response (48 hours +). A few weeks later, a one day full-scale exercise was conducted for the late phase (recovery) response to an RDD event. The lessons learned from this study are not available as of June 30, 2009. The objective of this report is to review and summarize anticipated Federal and State response actions and the roles and responsibilities of various agencies (DHS, EPA, DOE, NY-DEP, NY-DEC) with respect to decontamination issues that would arise from a radiological dispersion device (RDD), e.g., dirty bomb attack. These issues arise in the late phase of the response (48 hours and beyond) after the area has been stabilized and forensic information has been obtained. Much of the information provided in this report is taken directly from published guidance that is readily available.

Sullivan,T.

2009-06-30T23:59:59.000Z

431

EA-2001: Final Rule, 10 CFR Part 433, ‘Energy Efficiency Standards for New Federal Commercial and Multi-Family High- Rise Residential Buildings’ Baseline Standards Update  

Broader source: Energy.gov [DOE]

The EA examines the potential incremental environmental impacts of the PreliminaryFinal Rule on building habitability and the outdoor environment. To identify the potential environmental impacts that may result from implementing the PreliminaryFinal Rule, DOE compared the PreliminaryFinal Rule with the “no-action alternative” of using the minimum requirements of the previous version of the Federal standard – 10 CFR Part 433 (referred to as the “no-action alternative”).

432

A Database Management System for the Federal Courts  

E-Print Network [OSTI]

A Database Management System for the Federal Courts JACK R. BUCHANAN, RICHARD D. FENNELL Federal Making Information Systems, Inc., McLean, VA 22101; R. D. Fennell, Federal Judicial Center, Washington, D and several large-scale information management systems projects have been undertaken within the Federal

Samet, Hanan

433

Federal Participation in LEED in 2005 Christopher Payne  

E-Print Network [OSTI]

and in the use of USGBC's Leadership in Energy & Environmental Design (LEED) Green Building Rating System. CERTIFIED FEDERAL BUILDINGS As of September 2005, US federal agencies have certified 24 federal buildings. Papers at prior USGBC conferences have discussed federal buildings built before 2005. Table 1 lists

434

UC DAVIS -FEDERAL GRANT FINANCIAL REPORTING INFORMATION INFORMATION  

E-Print Network [OSTI]

UC DAVIS - FEDERAL GRANT FINANCIAL REPORTING INFORMATION GENERAL INFORMATION · The University is required by Federal sponsors to submit Financial Status Reports (FSRs) on all federal awards no later than.) o Extension of final budget period of a project period without additional Federal funds. o Change

Schladow, S. Geoffrey

435

A Hierarchical Checkpointing Protocol for Parallel Applications in Cluster Federations  

E-Print Network [OSTI]

A Hierarchical Checkpointing Protocol for Parallel Applications in Cluster Federations S federation. As a cluster federation comprises of a large number of nodes, there is a high probability fits to the characteristics of a cluster federation (large number of nodes, high latency and low

Paris-Sud XI, Université de

436

ANNOUNCEMENT OF FEDERAL FUNDING OPPORTUNITY (FFO) EXECUTIVE SUMMARY  

E-Print Network [OSTI]

Islands, the Republic of the Marshall Islands, Republic of Palau, and the Federated States of Micronesia

437

2004 Federal Energy and Water Management Award Winners  

Broader source: Energy.gov [DOE]

Lists of 2004 Federal Energy and Water Conservation awards to individuals, organizations, and small groups.

438

Participant Name:_____________________________ Canadian Access Federation: Trust Assertion Document (TAD)  

E-Print Network [OSTI]

(TAD) 1. Purpose A fundamental requirement of Participants in the Canadian Access Federation Access Federation: Trust Assertion Document (TAD) CANARIE Inc. - Canadian Access Federation Service Page Greg.Condon@unbc.ca (250) 960-5289 #12;Canadian Access Federation: Trust Assertion Document (TAD

Northern British Columbia, University of

439

2003 Federal Energy and Water Management Award Winners  

Broader source: Energy.gov [DOE]

List of 2003 Federal Energy and Water Management Award winners to individuals, small groups, and organizations.

440

Federal Utility Partnership Working Group Seminar: Washington Update  

Broader source: Energy.gov [DOE]

Presentation covers the Federal Utility Partnership Working Group Seminar: Washington Update on May 22, 2013.

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Contacts for Integrating Renewable Energy into Federal Construction Projects  

Broader source: Energy.gov [DOE]

Contacts to learn more about integrating renewable energy technologies into Federal construction projects.

442

Policy and Procedures for the Review of Federal Actions Impacting the  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket |21, 2015 7:00AM09 Class Deviation from the2

443

MONTICELLO NPL SITES Minutes and Action Items of the Federal Facilities Agreement Meeting  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '*I_ - I _

444

Monticello NPL Sites Federal Facilities Agreement Meeting Minutes & Action Items  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*.MSE Cores Tubay Long-TermGWSHP3SiteS H

445

CEQ Guidance on the Application of NEPA to Proposed Federal Actions in the  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd:June 2015 <Ones | DepartmentCEE Winter ProgramRequireUnited

446

Major contributions of the Tevatron  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministration -Lowellfor 2013 |Spherical TorusMajor

447

6999Federal Register / Vol. 71, No. 28 / Friday, February 10, 2006 / Proposed Rules vi. Federal Rules That May Duplicate,  

E-Print Network [OSTI]

March 9, 2006. ADDRESSES: The hearing will be in room 154 of the U.S. Federal Office Building, 222 W. 7 for submitting comments. · Mail: P. O Box 21668, Juneau, AK 99802 · Hand delivery to the Federal Building : 709 W6999Federal Register / Vol. 71, No. 28 / Friday, February 10, 2006 / Proposed Rules vi. Federal

448

Description of the Formerly Utilized Sites Remedial Action Program  

SciTech Connect (OSTI)

The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

Not Available

1980-09-01T23:59:59.000Z

449

Uranium Mill Tailings Remedial Action 1993 Roadmap  

SciTech Connect (OSTI)

The 1993 Roadmap for the Uranium Mill Tailings Remedial Action (UMTRA) Project office is a tool to assess and resolve issues. The US Department of Energy (DOE) UMTRA Project Office uses the nine-step roadmapping process as a basis for Surface and Groundwater Project planning. This is the second year the Roadmap document has been used to identify key issues and assumptions, develop logic diagrams, and outline milestones. This document is a key element of the DOE planning process. A multi-interest group used the nine-step process to focus on issues, root cause analysis and resolutions. This core group updated and incorporated comments on the basic assumptions, then used these assumptions to identify issues. The list of assumptions was categorized into the following areas: institutional, regulatory compliance, project management, human resource requirements, and other site-specific assumptions. The group identified 10 issues in the analysis phase. All of the issues are ranked according to importance. The number one issue from the 1992 Roadmap, ``Lack of sufficient human resources,`` remained the number one issue in 1993. The issues and their ranking are as follows: Lack of sufficient human resources; increasing regulatory requirements; unresolved groundwater issues; extension of UMTRCA through September 30, 1998; lack of post-UMTRA and post-cell closure policies; unpredictable amounts and timing of Federal funding; lack of regulatory compliance agreements; problem with states providing their share of remedial action costs; different interests and priorities among participants; and technology development/transfer. The issues are outlined and analyzed in detail in Section 8.0, with a schedule for resolution of these issues in Section 9.0.

Not Available

1993-10-18T23:59:59.000Z

450

Chemistry Major and Minor At A Glance  

E-Print Network [OSTI]

Chemistry Major and Minor At A Glance Major I ­ Pre-professional (Medicine, Dentistry, Business, Law, Engineering) Major II ­ ACS Certified e.g. Graduate Study or Entry Level Chemistry Employment. Major III ­ Forensic Chemistry Major IV** ­ Biochemistry Option Chemistry Minor General Chemistry I & II

Schmitt, William R.

451

Federal strategies to increase the implementation of combined heat and power technologies in the United States  

SciTech Connect (OSTI)

Recent interest in combined heat and power (CHP) is providing momentum to efforts aimed at increasing the capacity of this highly-efficient technology. Factors driving this increase in interest include the need to increase the efficiency of the nation's electricity generation infrastructure, DOE Assistant Secretary Dan Reicher's challenge to double the capacity of CHP by 2010, the success of DOE's Advanced Turbine Systems Program in supporting ultra-efficient CHP technologies, and the necessity of finding cost-effective solutions to address climate change and air quality issues. The federal government is committed to increasing the penetration of CHP technologies in the US. The ultimate goal is to build a competitive market for CHP in which policies and regulations support the implementation of a full suite of technologies for multiple applications. Specific actions underway at the federal level include technology strategies to improve CHP data collection and assessment and work with industry to encourage the development of advanced CHP technologies. Policy strategies include changes to federal environmental permitting procedures including CHP-friendly strategies in federal restructuring legislation, supporting tax credits and changes to depreciation requirements as economic incentives to CHP, working with industry to leverage resources in the development of advanced CHP technologies, educating state officials about the things they can do to encourage CHP, and increasing awareness about the benefits of CHP and the barriers limiting its increased implementation.

Laitner, J.; Parks, W.; Schilling, J.; Scheer, R.

1999-07-01T23:59:59.000Z

452

Corrective Action Investigation Plan for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

Corrective Action Unit 166 is located in Areas 2, 3, 5, and 18 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit (CAU) 166 is comprised of the seven Corrective Action Sites (CASs) listed below: (1) 02-42-01, Cond. Release Storage Yd - North; (2) 02-42-02, Cond. Release Storage Yd - South; (3) 02-99-10, D-38 Storage Area; (4) 03-42-01, Conditional Release Storage Yard; (5) 05-19-02, Contaminated Soil and Drum; (6) 18-01-01, Aboveground Storage Tank; and (7) 18-99-03, Wax Piles/Oil Stain. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on February 28, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 166. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the CAI for CAU 166 includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling. (2) Conduct radiological surveys. (3) Perform field screening. (4) Collect and submit environmental samples for laboratory analysis to determine if contaminants of concern are present. (5) If contaminants of concern are present, collect additional step-out samples to define the extent of the contamination. (6) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This Corrective Action Investigation Plan has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection, and field work will commence following approval.

David Strand

2006-06-01T23:59:59.000Z

453

Corrective Action Investigation Plan for Corrective Action Unit 542: Disposal Holes, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 542 is located in Areas 3, 8, 9, and 20 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 542 is comprised of eight corrective action sites (CASs): (1) 03-20-07, ''UD-3a Disposal Hole''; (2) 03-20-09, ''UD-3b Disposal Hole''; (3) 03-20-10, ''UD-3c Disposal Hole''; (4) 03-20-11, ''UD-3d Disposal Hole''; (5) 06-20-03, ''UD-6 and UD-6s Disposal Holes''; (6) 08-20-01, ''U-8d PS No.1A Injection Well Surface Release''; (7) 09-20-03, ''U-9itsy30 PS No.1A Injection Well Surface Release''; and (8) 20-20-02, ''U-20av PS No.1A Injection Well Surface Release''. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 30, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 542. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the CAI for CAU 542 includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling. (2) Conduct radiological surveys. (3) Conduct geophysical surveys to locate previously unidentified features at CASs 03-20-07, 03-20-09, 03-20-10, 03-20-11, and 06-20-03. (4) Perform field screening. (5) Collect and submit environmental samples for laboratory analysis to determine whether contaminants of concern (COCs) are present. (6) Collect quality control samples for laboratory analyses to evaluate the performance of measurement systems and controls based on the requirements of the data quality indicators. (7) If COCs are present at the surface/near surface (< 15 feet below ground surface), collect additional step-out samples to define the extent of the contamination. (8) If COCs are present in the subsurface (i.e., base of disposal hole), collect additional samples to define the vertical extent of contamination. A conservative use restriction will be used to encompass the lateral extent of subsurface contamination. (9) Stake or flag sample locations in the field, and record coordinates through global positioning systems surveying. (10) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This Corrective Action Investigation Plan has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan.

Laura Pastor

2006-05-01T23:59:59.000Z

454

Corrective Action Plan for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 166, Storage Yards and Contaminated Materials, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 166 consists of seven Corrective Action Sites (CASs) located in Areas 2, 3, 5, and 18 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada (Figure 1). CAU 166 consists of the following CASs: (1) CAS 02-42-01, Cond. Release Storage Yd - North; (2) CAS 02-42-02, Cond. Release Storage Yd - South; (3) CAS 02-99-10, D-38 Storage Area; (4) CAS 03-42-01, Conditional Release Storage Yard; (5) CAS 05-19-02, Contaminated Soil and Drum; (6) CAS 18-01-01, Aboveground Storage Tank; and (7) CAS 18-99-03, Wax Piles/Oil Stain. Details of the site history and site characterization results for CAU 166 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007).

NSTec Environmental Restoration

2007-10-01T23:59:59.000Z

455

Corrective Action Plan for Corrective Action Unit 254: Area 25 R-MAD Decontamination Facility Nevada Test Site, Nevada  

SciTech Connect (OSTI)

The Area 25 Reactor Maintenance, Assembly, and Disassembly Decontamination Facility is identified in the Federal Facility Agreement and Consent Order (FFACO) as Corrective Action Unit (CAU) 254. CAU 254 is located in Area 25 of the Nevada Test Site and consists of a single Corrective Action Site CAS 25-23-06. CAU 254 will be closed, in accordance with the FFACO of 1996. CAU 254 was used primarily to perform radiological decontamination and consists of Building 3126, two outdoor decontamination pads, and surrounding soil within an existing perimeter fence. The site was used to decontaminate nuclear rocket test-car hardware and tooling from the early 1960s through the early 1970s, and to decontaminate a military tank in the early 1980s. The site characterization results indicate that, in places, the surficial soil and building materials exceed clean-up criteria for organic compounds, metals, and radionuclides. Closure activities are expected to generate waste streams consisting of nonhazardous construction waste. petroleum hydrocarbon waste, hazardous waste, low-level radioactive waste, and mixed waste. Some of the wastes exceed land disposal restriction limits and will require off-site treatment before disposal. The recommended corrective action was revised to Alternative 3- ''Unrestricted Release Decontamination, Verification Survey, and Dismantle Building 3126,'' in an addendum to the Correction Action Decision Document.

C. M. Obi

2000-12-01T23:59:59.000Z

456

BIOMASS ACTION PLAN FOR SCOTLAND  

E-Print Network [OSTI]

BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

457

STUDENT DISCIPLINARY ACTION FORM INSTRUCTIONS  

E-Print Network [OSTI]

STUDENT DISCIPLINARY ACTION FORM INSTRUCTIONS Labor Program Office Berea College While one across campus. The "Student Disciplinary Action Form" was designed to provide labor supervisors directly with the student and discuss the matter in private. Calmly discuss the offense and the corrective

Baltisberger, Jay H.

458

Using Dashboards to Improve Energy and Comfort in Federal Buildings  

SciTech Connect (OSTI)

Federal agencies are taking many steps to improve the sustainability of their operations, including improving the energy efficiency of their buildings, promoting recycling and reuse of materials, encouraging carpooling and alternative transit schemes, and installing low flow water fixture units are just a few of the common examples. However, an often overlooked means of energy savings is to provide feedback to building users about their energy use through information dashboards connected to a building?s energy information system. An Energy Information System (EIS), broadly defined, is a package of performance monitoring software, data acquisition hardware, and communication systems that is used to collect, store, analyze, and display energy information. At a minimum, the EIS provides the whole-building energy-use information (Granderson 2009a). We define a ?dashboard? as a display and visualization tool that utilizes the EIS data and technology to provide critical information to users. This information can lead to actions resulting in energy savings, comfort improvements, efficient operations, and more. The tools to report analyzed information have existed in the information technology as business intelligence (Few 2006). The dashboard is distinguished from the EIS as a whole, which includes additional hardware and software components to collect and storage data, and analysis for resources and energy management (Granderson 2009b). EIS can be used for a variety of uses, including benchmarking, base-lining, anomaly detection, off-hours energy use evaluation, load shape optimization, energy rate analysis, retrofit and retro-commissioning savings (Granderson 2009a). The use of these EIS features depends on the specific users. For example, federal and other building managers may use anomaly detection to identify energy waste in a specific building, or to benchmark energy use in similar buildings to identify energy saving potential and reduce operational cost. There are several vendors of EIS technology that provide information on energy and other environmental variables in buildings.

Lawrence Berkeley National Laboratory; Marini, Kyle; Ghatikar, Girish; Diamond, Richard

2011-02-01T23:59:59.000Z

459

Corrective Action Decision Document/Closure Report for Corrective Action Unit 504: 16a-Tunnel Muckpile, Nevada Test Site  

SciTech Connect (OSTI)

This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 504, 16a-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 504 is comprised of four Corrective Action Sites (CASs): • 16-06-01, Muckpile • 16-23-01, Contaminated Burial Pit • 16-23-02, Contaminated Area • 16-99-01, Concrete Construction Waste Corrective Action Site 16-23-01 is not a burial pit; it is part of CAS 16-06-01. Therefore, there is not a separate data analysis and assessment for CAS 16-23-01; it is included as part of the assessment for CAS 16-06-01. In addition to these CASs, the channel between CAS 16-23-02 (Contaminated Area) and Mid Valley Road was investigated with walk-over radiological surveys and soil sampling using hand tools. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictions for CAU 504. A CADD was originally submitted for CAU 504 and approved by the Nevada Division of Environmental Protection (NDEP). However, following an agreement between NDEP, DTRA, and the DOE, National Nuclear Security Administration Nevada Site Office to change to a risk-based approach for assessing the corrective action investigation (CAI) data, NDEP agreed that the CAU could be re-evaluated using the risk-based approach and a CADD/CR prepared to close the site.

NSTec Environmental Restoration

2010-03-15T23:59:59.000Z

460

1998 federal technical standards workshop: Proceedings  

SciTech Connect (OSTI)

The theme for the 1998 workshop was Standards Management -- A World of Change and Opportunities. The workshop`s goal was to further the implementation of the National Technology Transfer and Advancement Act of 1995 (Public Law 104-113) through the sharing of standards management success stories, lessons learned, and emerging initiatives within the Executive Branch of the Federal Government. The target audience for this workshop included agency/department and contractor personnel and representatives of standards developing organizations that either used technical standards in their work for the Federal Government of participated in standards writing/management activities in support of the missions and programs of Federal agencies/departments. As with previous standards workshops sponsored by the DOE, views on the technical subject areas under the workshop theme were solicited from and provided by agency Standards Executives and standards program managers, voluntary standards organizations, and the private sector. This report includes vugraphs of the presentations.

NONE

1998-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Evidence-Based Background Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans - Implementing Sustainability: The Institutional-Behavioral Dimension  

SciTech Connect (OSTI)

This document is part of a larger, programmatic effort to assist federal agencies in taking action and changing their institutions to achieve and maintain federal sustainability goals, while meeting their mission goals. FEMP is developing guidance for federal agency efforts to enable institutional behavior change for sustainability, and for making sustainability “business as usual.” The driving requirement for this change is Executive Order (EO) 13514, Federal Leadership in Environmental, Energy, and Economic Performance. FEMP emphasizes strategies for increasing energy efficiency and renewable energy utilization as critical components of attaining sustainability, and promotes additional non-energy action pathways contained in EO 13514. This report contributes to the larger goal by laying out the conceptual and evidentiary underpinnings of guidance to federal agencies. Conceptual frameworks focus and organize the development of guidance. We outline a series of progressively refined conceptual frameworks, including a multi-layer approach, key steps in sustainability implementation, a process view of specific approaches to institutional change, the agency Strategic Sustainability Performance Plans (SSPPs), and concepts related to context-specific rules, roles and tools for sustainability. Additionally, we tap pertinent bodies of literature in drawing eight evidence-based principles for behavior change. These principles are important foundations upon which to build in selecting strategies to effect change in organizations. Taken together, this report presents a suite of components that inform the training materials, presentations, web site, and other products that provide guidance to federal agencies.

Malone, Elizabeth L. [Pacific Northwest National Laboratory (PNNL); Sanquist, Tom [Pacific Northwest National Laboratory (PNNL); Wolfe, Amy K. [ORNL; Diamond, Rick [Lawrence Berkeley National Laboratory (LBNL); Payne, Christopher [Lawrence Berkeley National Laboratory (LBNL); Dion, Jerry [ORNL

2013-06-01T23:59:59.000Z

462

FY12 -TOTAL AWARDS BY SPONSOR TYPE AND UNIT Unit Federal Industry International Private Foundation Local Government TotalOther Private State  

E-Print Network [OSTI]

FY12 - TOTAL AWARDS BY SPONSOR TYPE AND UNIT Unit Federal Industry International Private Foundation Local Government TotalOther Private State This table reflects all awards made to UGA and UGARF,025,861 VP FOR STUDENT AFFAIRS UNITS $ 0 $ 0 $ 0 $ 0 $ 0 $ 159,668 $ 11,550 $ 171,218 AFFIRMATIVE ACTION $ 0

Arnold, Jonathan

463

Corrective Action Decision Document/Closure Report for Corrective Action Unit 309: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 0 with Errata Sheet  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 309, Area 12 Muckpiles, Nevada Test Site (NTS), Nevada. The corrective actions proposed in this document are according to the ''Federal Facility Agreement and Consent Order'' (FFACO) that was agreed to by the State of Nevada, U.S. Department of Energy (DOE), and the U.S. Department of Defense (FFACO, 1996). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 309 is comprised of the three Corrective Action Sites (CASs) (Figure 1-1) listed below: (1) CAS 12-06-09, Muckpile; (2) CAS 12-08-02, Contaminated Waste Dump (CWD); and (3) CAS 12-28-01, I-, J-, and K-Tunnel Debris. Corrective Action Sites 12-06-09 and 12-08-02 will be collectively referred to as muckpiles in this document. Corrective Action Site 12-28-01 will be referred to as the fallout plume because of the extensive lateral area of debris and fallout contamination resulting from the containment failures of the J- and K-Tunnels. A detailed discussion of the history of this CAU is presented in the ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 309: Area 12 Muckpiles, Nevada Test Site (NTS), Nevada.'' (NNSA/NSO, 2004). This CADD/CR provides justification for the closure of CAU 309 without further corrective action. This justification is based on process knowledge and the results of the investigative activities conducted according to the CAIP (NNSA/NSO, 2004), which provides information relating to the history, planning, and scope of the investigation. Therefore, this information will not be repeated in this CADD/CR.

Alfred Wickline

2005-12-01T23:59:59.000Z

464

Corrective Action Decision Document/Closure Report for Corrective Action Unit 190: Contaminated Waste Sites, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 190, Contaminated Waste Sites, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (1996, as amended January 2007). Corrective Action Unit 190 is comprised of the following four corrective action sites (CASs): • 11-02-01, Underground Centrifuge • 11-02-02, Drain Lines and Outfall • 11-59-01, Tweezer Facility Septic System • 14-23-01, LTU-6 Test Area The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation for closure of CAU 190 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from March 21 through June 26, 2007. All CAI activities were conducted as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 190: Contaminated Waste Sites, Nevada Test Site, Nevada (NNSA/NSO, 2006). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective process: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. The CAU 190 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the data quality objective data needs.

Alfred Wickline

2008-03-01T23:59:59.000Z

465

Corrective Action Decision Document/Closure Report for Corrective Action Unit 234: Mud Pits, Cellars, and Mud Spills Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 234, Mud Pits, Cellars, and Mud Spills, located in Areas 2, 3, 4, 12, and 15 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended February 2008). Corrective Action Unit 234 is comprised of the following 12 corrective action sites: •02-09-48, Area 2 Mud Plant #1 •02-09-49, Area 2 Mud Plant #2 •02-99-05, Mud Spill •03-09-02, Mud Dump Trenches •04-44-02, Mud Spill •04-99-02, Mud Spill •12-09-01, Mud Pit •12-09-04, Mud Pit •12-09-08, Mud Pit •12-30-14, Cellar •12-99-07, Mud Dump •15-09-01, Mud Pit The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation for closure of CAU 234 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 234: Mud Pits, Cellars, and Mud Spills (NNSA/NSO, 2007). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: •Determine whether contaminants of concern are present. •If contaminants of concern are present, determine their extent. •Provide sufficient information and data to complete appropriate corrective actions. The CAU 234 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs.

Grant Evenson

2008-05-01T23:59:59.000Z

466

Federal NEPA Contacts | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES ANDIndustrialEnergy Federal EfficiencyReportingNEPA Contacts Federal

467

Federal Prison Industries-Requirement for Market  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES ANDIndustrialEnergy FederalFLASH 2004-12 April 5, 2004 Federal

468

Federal Utility Partnership Working Group Seminar Agenda  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES ANDIndustrialEnergy FederalFLASHof EnergyCoalDepartment Federal

469

Federal, Contractor, or Subcontractor | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES ANDIndustrialEnergy FederalFLASHof EnergyCoalDepartmentFederal,

470

Federal Register Notice | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecember U.S. Department-5Federal Register Notice Federal

471

Federal Utility Partnership Working Group Meeting  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecordFederal Registry Comments May 4-9, 2007. FederalGET1 Report Page

472

Federal Utility Partnership Working Group Meeting  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecordFederal Registry Comments May 4-9, 2007. FederalGET1 Report Page2 Report

473

Federal Utility Partnership Working Group Meeting  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecordFederal Registry Comments May 4-9, 2007. FederalGET1 Report Page2

474

Federal Utility Partnership Working Group Meeting Report  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecordFederal Registry Comments May 4-9, 2007. FederalGET1 ReportCompilation

475

Federal Energy Management Program | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataCombined Heat & PowerEnergy BlogExchangeSummaryFederal DigitalofFederal

476

Federal Register Notices | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review:Department ofDistribution Infrastructure |Federal Long Tern Care2 FederalInformation

477

Survey and analysis of federally developed technology  

SciTech Connect (OSTI)

The methodology and results of a test effort to determine whether there exist unexpected opportunities for the direct transfer of technologies from federal laboratories to industry are presented. Specifically, the latest results of six federal laboratories with potential application in the pulp and paper industry, particularly those results applicable to improving energy productivity, were evaluated, cataloged, and distributed to industry representatives to gauge their reaction. The principal methodological steps in this effort were the development of a taxonomy of the pulp and paper industry, identification of industry needs and laboratory capabilities, laboratory visits, review of technology findings with industry, and evaluation and compilation of industry responses.

Reed, J.E.; Conrad, J.L.

1983-02-01T23:59:59.000Z

478

Impact of New Federal Efficiency Performance Standards on the Industrial Motor Marketplace  

E-Print Network [OSTI]

Impact of New Federal Efficiency Performance Standards on the Industrial Motor Marketplace R. Neal Elliott, Ph.D., P.E. Associate Director for Research American Council for an Energy-Efficient Economy Washington, DC ABSTRACT.... As noted above, beginning in the 1980's, the National Electrical Manufacturers' Association (NEMA) began including energy efficiency labeling requirements in its major stand MG-1. The efficiencies were based upon the Institute of Electrical...

Elliott, R. N.

479

Corrective Action Decision Document/Closure Report for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consist of implementing a use restriction and posting warning signs at each site. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 371. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 371. • Corrective Action Unit 371 should be moved from Appendix III to Appendix IV of the FFACO.

Patrick Matthews

2010-07-01T23:59:59.000Z

480

Audit of the Department of Energy`s management of field contractor employees assigned to headquarters and other federal agencies  

SciTech Connect (OSTI)

The Department of Energy (Department) has spent at least $76 million annually for field contractor employee support in Headquarters and other Federal agencies. The employees were to provide technical expertise and experience critical to Department operations and programs. Overall, the audit was performed to determine if the Department was managing the use of field contractor employees assigned to Headquarters and other Federal agencies. Specifically, it was to determine whether the Department reviews and evaluates the costs for the use of contractor employees, is reimbursed for contractors working at other Federal agencies, and had implemented corrective actions proposed as the result of a prior audit report on this subject. The Department did not effectively manage the use of field contractor employees assigned to Headquarters and other Federal agencies. Specifically, the Department was unable to identify all contractor employees assigned to the Washington, DC area or determine the total cost of maintaining them; some employees were providing routine support and administrative services rather than unique program expertise; and several of the Department`s contractors had assigned their employees to work in other agencies without receiving full reimbursement for their services. In addition, the Department did not fully implement the corrective actions it agreed to in the prior audit report. Recommendations were made for the Deputy Secretary based on the audit findings. 3 tabs.

NONE

1997-12-05T23:59:59.000Z

Note: This page contains sample records for the topic "major federal action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 204: STORAGE BUNKERS, NEVADA TEST SITE, NEVADA  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 330 consists of four Corrective Action Sites (CASs) located in Areas 6, 22, and 23 of the Nevada Test Site (NTS). The unit is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as CAU 330: Areas 6, 22, and 23 Tanks and Spill Sites. CAU 330 consists of the following CASs: CAS 06-02-04, Underground Storage Tank (UST) and Piping CAS 22-99-06, Fuel Spill CAS 23-01-02, Large Aboveground Storage Tank (AST) Farm CAS 23-25-05, Asphalt Oil Spill/Tar Release

NONE

2006-04-01T23:59:59.000Z

482

Closure Report for Corrective Action Unit 396: Area 20 Spill Sites, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 396, Area 20 Spill Sites, is located on the Nevada Test Site approximately 105 kilometers (65 miles) northwest of Las Vegas, Nevada. CAU 396 is listed in Appendix II of the Federal Facility Agreement and Consent Order of 1996 and consists of the following four Corrective Action Sites (CASs) located in Area 20 of the Nevada Test Site: CAS 20-25-01, Oil Spills (2); CAS 20-25-02, Oil Spills; CAS 20-25-03, Oil Spill; CAS 20-99-08, Spill. Closure activities for CAU 396 were conducted in accordance with the Federal Facility Agreement and Consent Order and the Nevada Division of Environmental Protection-approved Streamlined Approach for Environmental Restoration Plan for CAU 396.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

2004-06-01T23:59:59.000Z

483

New York state information handbook formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying our the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New York. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

None

1980-12-31T23:59:59.000Z

484

New Mexico state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

2014-12-31T23:59:59.000Z

485

Generic protocol for environmental audits at federal facilities  

SciTech Connect (OSTI)

The Generic Protocol is a supplement to earlier efforts by EPA to provide technical assistance to Federal agencies on environmental auditing. EPA`s Office of Federal Activities (OFA) issued the Federal Facility Compliance Strategy (referred to as the `Yellow Book`), prepared in 1984 and revised in 1988, as a framework for EPA`s media programs to follow to ensure that Federal facilities are fully integrated into Federal and State compliance monitoring and enforcement activities. The policy encourages Federal agencies to voluntarily develop comprehensive auditing programs to ensure environmental compliance.

NONE

1989-08-01T23:59:59.000Z

486

Mind Out of Action: The Intentionality of Automatic Actions   

E-Print Network [OSTI]

We think less than we think. My thesis moves from this suspicion to show that standard accounts of intentional action can't explain the whole of agency. Causalist accounts such as Davidson's and Bratman's, according to ...

Di Nucci, Ezio

2008-01-01T23:59:59.000Z

487

actions significant actions: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commitment in January 2009. In doing so, he joined more than 600 presidents to achieve climate neutrality as soon as possible. 2. Initiate two or more tangible actions to reduce...

488

Wildfire Suppression Equipment Engines CSFS has placed 140 federal excess property vehicles located throughout the state. Our  

E-Print Network [OSTI]

Wildfire Suppression Equipment Engines ­ CSFS has placed 140 federal excess property vehicles fire engines and provides all major maintenance. The all-wheel drive (4x4 and 6x6) engines are equipped equipment such as hose, nozzles, and hand tools. These engines are inspected annually and updated

489

SCOTTISH RED SQUIRREL ACTION PLAN  

E-Print Network [OSTI]

SCOTTISH RED SQUIRREL ACTION PLAN 2006­2011 #12;#12;S C O T T I S H R E D S Q U I R R E L A C T I O.1 Background 1 1.2 Action Plan Working Group 1 1.3 Issues affecting the conservation of the red squirrel 1 1.2 Timescale and partnership working 3 2.3 Rationale 3 2.4 Key actions 4 2.4.1 Establish and monitor the red

490

The Undergrad Major in Geography or Cartography  

E-Print Network [OSTI]

honors in the major Cancel a major in Geography or Cartography Interpret a DARS report (or What-If DARS if you haven't yet declared) for your major to see what requirements you need to fulfill Explain and substitutions in your L&S degree (BA,BS) Arrange for a course substitution for your major (DARS Exception

Wisconsin at Madison, University of

491

Financial statistics of major U.S. investor-owned electric utilities 1993  

SciTech Connect (OSTI)

The Financial Statistics of Major US Investor-Owned Electric Utilities publication presents summary and detailed financial accounting data on the investor-owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to investor-owned electric utility issues.

Not Available

1995-01-01T23:59:59.000Z

492

Financial statistics of major US investor-owned electric utilities 1994  

SciTech Connect (OSTI)

The Financial Statistics of Major U.S. Investor-Owned Electric Utilities publication presents summary and detailed financial accounting data on the investor-owned electric utilities. The objective of the publication is to provide Federal and State Governments, industry, and the general public with current and historical data that can be used for making policy and decisions relating to investor-owned electric utility issues.

NONE

1995-12-01T23:59:59.000Z

493

Design Editorial A Design Societies Federation  

E-Print Network [OSTI]

Journal of Mechanical Design Editorial A Design Societies Federation You can recognize the many faces of design by looking at the many different professional societies that promote design around the world. These societies may have roots in engineering or archi- tecture or industrial design but they all

Papalambros, Panos

494

Hempstead Rd FederalHeightsDr.  

E-Print Network [OSTI]

WolcottSt 2030 East Hempstead Rd FederalHeightsDr. MedicalDr. North 100 South ConnorRd Red Butte Canyon Rd W asatch D r. FortDouglasBlvd UniversityStreet W akaraW ay 500 South North Campus Dr. North Care ACC Parking Terrace Eccles Business Building Health Professions Merrill Engineering The Children

Tipple, Brett

495

Federal Recycling Program Printed on recycled paper.  

E-Print Network [OSTI]

#12;Federal Recycling Program Printed on recycled paper. The Forest Health Technology Enterprise of discrimination, write USDA, Director, Office of Civil Rights, Room 326-W, Whitten Building, 1400 independence MALEZAS POR ENEMIGOS NATURALES R. G. VAN DRIESCHE University of Massachusetts Amherst, Massachusetts, USA

Hoddle, Mark S.

496

Karen Hedlund, Chief Counsel Federal Railroad Administration  

E-Print Network [OSTI]

Karen Hedlund, Chief Counsel Federal Railroad Administration Presentation to the Hagestad Sandhouse-educate, and out-build the rest of the world... That's how we'll win the future." - President Barack Obama, January China are building . . . thousands of miles of high-speed rail." - President Barack Obama, April 19

Bustamante, Fabián E.

497

Uncle Sam goes to market: Federal agency disposal of emission reduction credits under the Federal property management regulations. Master's thesis  

SciTech Connect (OSTI)

With the realignment and closure of Federal facilities, especially Department of Defense installations, Federal agencies have been presented with a unique opportunity: the chance to create and dispose of air emission reduction credits (ERCs). This situation and current commitments by the Congress and EPA to expand the use of market based pollution control programs have generated interest in certain circles as to whether and how Federal agencies can dispose of ERCs and similar pollution rights and allowances. This paper will discuss ERCs, why the disposal of ERCs by Federal agencies is a pressing issue, and how Federal agencies can dispose of ERCs under existing Federal property laws and regulations.

Rafferty, V.J.

1994-01-30T23:59:59.000Z

498

AUGUST 2014 POLICY PAPER | Why did major global health institutions scale up ACTs but ignore combination zinc/oral rehydration therapy? | 1 Why did major global health institutions scale up artemisinin-based  

E-Print Network [OSTI]

AUGUST 2014 POLICY PAPER | Why did major global health institutions scale up ACTs but ignore combination zinc/oral rehydration therapy? | 1 Why did major global health institutions scale up artemisinin agencies. Over the last decade, these institu- tions took concerted action to scale up the newly

Mullins, Dyche

499

Accelerating RCRA corrective action: The principles of the DOE approach  

SciTech Connect (OSTI)

The US Department of Energy (DOE) is involved in the remediation of environmental contamination at many of its facilities under the Resource Conservation and Recovery Act (RCRA). RCRA`s corrective action provisions were established by the Hazardous and Solid Waste Amendments of 1984 (HSWA). In response to the HSWA mandate, EPA established a program for the conduct of RCRA corrective action that was similar to that established under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). In addition, EPA developed and implemented its ``stabilization`` initiative as a means of quickly addressing immediate risks posed by releases until long term solutions can be applied. To improve the efficiency of environmental restoration at its facilities, DOE is developing guidance and training programs on accelerated environmental restoration under RCRA. A RCRA guidance document, entitled ``Accelerating RCRA Corrective Action at DOE Facilities,`` is currently being developed by DOE`s Office of Environmental Policy and Assistance. The new guidance document will outline a decision-making process for determining if acceleration is appropriate for individual facilities, for identifying, evaluating, and selecting options for program acceleration, and for implementing selected acceleration options. The document will also discuss management and planning strategies that provide a firm foundation for accelerating RCRA corrective action. These strategies include a number of very basic principles that have proven effective at DOE and other federal facilities, as well as some new approaches. The purpose of this paper is to introduce DOE`s new guidance document, discuss the general approach presented in the guidance for accelerating RCRA corrective action, and to emphasize some of the more important principles of effective management and planning.

Kimmell, T.A.; Green, D.R.; Ranek, N.L. [Argonne National Lab., IL (United States); Coalgate, J.L. [USDOE, Washington, DC (United States)

1995-03-01T23:59:59.000Z

500

The effects of interactions between federal and state climate policies : implications for federal climate policy design  

E-Print Network [OSTI]

In the absence of a federal policy to cap greenhouse gas (GHG) emissions many states are moving forward with their own initiatives, which currently range from announcements of commitments to reduce greenhouse gases to a ...

McGuinness, Meghan

2008-01-01T23:59:59.000Z