1

Site transition framework for long-term surveillance and maintenance  

SciTech Connect (OSTI)

This document provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTSM) responsibilities. It is a tool to help facilitate a smooth transition from remediation to LTSM, providing a systematic process for affected parties to utilize in analyzing the baseline to understand and manage the actions from EM mission completion through a siteís transition into LTSM. The framework is not meant to provide an exhaustive list of the specific requirement and information that are needed. Sites will have unique considerations that may not be adequately addressed by this tool, and it is anticipated that a team comprised of the transferring and receiving organization will use judgment in utilizing this augmenting with other DOE guidance. However the framework should be followed to the extent possible at each site; and adapted to accommodate unique site-specific requirements, needs, and documents. Since the objective of the tool is facilitate better understanding of the conditions of the site and the actions required for transfer, the transition team utilizing the checklist is expected to consult with management of both the receiving and transferring organization to verify that major concerns are addressed. Ideally, this framework should be used as early in the remediation process as possible. Subsequent applications of the Site Transition Framework (STF) to the site should be conducted periodically and used to verify that all appropriate steps have been or will be taken to close-out the site and that actions by both organization are identified to transfer the site to LTSM. The requirements are provided herein.

none,

2014-04-01T23:59:59.000Z

2

STANDARD OPERATING PROCEDURES Annual Site Maintenance  

E-Print Network [OSTI]

IMPROVE STANDARD OPERATING PROCEDURES SOP 226 Annual Site Maintenance Date Last Modified Modified This standard operating procedure (SOP) describes the procedures for annual maintenance of equipment Sampler Operation Manual #12;SOP 226: Annual Site Maintenance 3 1.0 PURPOSE AND APPLICABILITY

Fischer, Emily V.

3

University Marketing Communications UMC Web Site Maintenance Service  

E-Print Network [OSTI]

University Marketing Communications UMC Web Site Maintenance Service Overview Content management and ongoing Web site maintenance is an essential part of any Web project plan. When developing a new Web site in Web maintenance activities. Benefits Our Web maintenance service gives you ongoing access to our group

Sibille, Etienne

4

STANDARD OPERATING PROCEDURES Sampler Maintenance by Site Operators  

E-Print Network [OSTI]

IMPROVE STANDARD OPERATING PROCEDURES SOP 201 Sampler Maintenance by Site Operators Date Last.0 PURPOSE AND APPLICABILITY This standard operating procedure (SOP) describes the procedures and schedules. The procedural steps for weekly maintenance and repairs performed by the site operator are included in TI 201A

Fischer, Emily V.

5

Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance  

SciTech Connect (OSTI)

This document presents guidance for implementing the process that the U.S. Department of Energy (DOE) Office of Legacy Management (LM) will use for assuming perpetual responsibility for a closed uranium mill tailings site. The transition process specifically addresses sites regulated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) but is applicable in principle to the transition of sites under other regulatory structures, such as the Formerly Utilized Sites Remedial Action Program.

none,

2012-03-01T23:59:59.000Z

6

Site Transition Guidance  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNGInternational Energy Agency |AwardJohnson, Steve5,ShiprockPaducahSite

7

Site Transition Plan Guidance, December 2004  

SciTech Connect (OSTI)

A short Department of Energy program document has been created to provide an outline on what the Site Transition Plan (STP) objectives are for the transition from the Office of Environmental Management to the newly established Office of Legacy Management.

none,

2004-12-01T23:59:59.000Z

8

Site Transition Process upon Completion of the Cleanup Mission...  

Office of Environmental Management (EM)

218: Develop a Fact Sheet on Site Transition at On-going Mission Sites Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy...

9

Los Alamos Site Office Nuclear Maintenance Management Program...  

Office of Environmental Management (EM)

WCRR Monthly Diesel Generator PM, dated 04082011 WI 06.01 Attachment A, JRF-11-06 Preventive Maintenance Cancellation, dated 4122011 WI 06.01 Attachment A, JRF-11-09...

10

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2011  

SciTech Connect (OSTI)

This report summarizes the 2011 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi.

None

2012-03-01T23:59:59.000Z

11

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2009  

SciTech Connect (OSTI)

This report summarizes the annual inspection, sampling, and maintenance activities performed on and near the Salmon, Mississippi, Site in calendar year 2009. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report complies with the annual report requirement. The Salmon, MS, Site is located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS The site encompasses 1,470 acres and is not open to the general public. The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned responsibility for the site effective October 1, 2006

None

2010-10-01T23:59:59.000Z

12

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010  

SciTech Connect (OSTI)

This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

None

2011-03-01T23:59:59.000Z

13

Site Transition Plan Guidance | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the Americas |DOE FormerEnergy DataPlan Guidance Site Transition

14

Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freig pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestr  

E-Print Network [OSTI]

Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freig pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation ope

15

Implementation Guide for Surveillance and Maintenance during Facility Transition and Disposition  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

As DOE facilities complete mission operations and are declared excess, they pass into a transition phase that ultimately prepares them for disposition. The disposition phase of a facility's life cycle usually includes deactivation, decommissioning, and surveillance and maintenance (S&M) activities.

1999-09-29T23:59:59.000Z

16

Site Transition Framework for Long-Term Surveillance and Maintenance |  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the Americas |DOE FormerEnergy Data Access|Department of

17

Site Transition Framework for Long-Term Surveillance and Maintenance |  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the Americas |DOE FormerEnergy Data Access|Department

18

Site Transition Framework for Long-Term Surveillance and Maintenance  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNGInternational Energy Agency |AwardJohnson, Steve5,ShiprockPaducah

19

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012  

SciTech Connect (OSTI)

This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate

None

2013-03-01T23:59:59.000Z

20

Site Transition Process Upon Cleanup Completion. Fact Sheet  

SciTech Connect (OSTI)

After environmental remediation is completed at a site and there is no continuing mission, responsibility for the site and the associated records are transferred to the U.S. Department of Energy (DOE) Office of Legacy Management for post-closure management. Where residual hazards (e.g., disposal cells, ground water contamination) remain, active long-term surveillance and maintenance will be required to ensure protection of human health and the environment.

none,

2009-05-19T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)  

SciTech Connect (OSTI)

This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

Waite, J.L.

1996-04-12T23:59:59.000Z

22

LTS Transition and Timeline - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 LOS ALAMOS,Transition and Timeline About Us LTS

23

Transportation cask decontamination and maintenance at the potential Yucca Mountain repository; Yucca Mountain Site characterization project  

SciTech Connect (OSTI)

This study investigates spent fuel cask handling experience at existing nuclear facilities to determine appropriate cask decontamination and maintenance operations at the potential Yucca Mountain repository. These operations are categorized as either routine or nonroutine. Routine cask decontamination and maintenance tasks are performed in the cask preparation area at the repository. Casks are taken offline to a separate cask maintenance area for major nonroutine tasks. The study develops conceptual designs of the cask preparation area and cask maintenance area. The functions, layouts, and major features of these areas are also described.

Hartman, D.J.; Miller, D.D. [Bechtel National, Inc., San Francisco, CA (United States); Hill, R.R. [Sandia National Labs., Albuquerque, NM (United States)

1992-04-01T23:59:59.000Z

24

Somatic Sex Determination in D. melanogaster: Insights in the Establishment to Maintenance Transition  

E-Print Network [OSTI]

regulatory gene Sexlethal (Sxl). Expression of Sxl is initially accomplished only in females through activation of the establishment promoter SxlPe. Later in development, Sxl is transcribed in both sexes through a maintenance promoter, SxlPm, but functional...

Gonzalez Rojos, Alejandra Noemi

2012-07-16T23:59:59.000Z

25

Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freight pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedes  

E-Print Network [OSTI]

and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operat and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operations pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestrian

26

Savannah River Site Eastern Transportation Hub: A Concept For a DOE Eastern Packaging, Staging and Maintenance Center - 13143  

SciTech Connect (OSTI)

The Department of Energy (DOE) is working to de-inventory sites and consolidate hazardous materials for processing and disposal. The DOE administers a wide range of certified shipping packages for the transport of hazardous materials to include Special Nuclear Material (SNM), radioactive materials, sealed sources and radioactive wastes. A critical element to successful and safe transportation of these materials is the availability of certified shipping packages. There are over seven thousand certified packagings (i.e., Type B/Type AF) utilized within the DOE for current missions. The synergistic effects of consolidated maintenance, refurbishment, testing, certification, and costing of these services would allow for efficient management of the packagings inventory and to support anticipated future in-commerce shipping needs. The Savannah River Site (SRS) receives and ships radioactive materials (including SNM) and waste on a regular basis for critical missions such as consolidated storage, stabilization, purification, or disposition using H-Canyon and HB-Line. The Savannah River National Laboratory (SRNL) has the technical capability and equipment for all aspects of packaging management. SRS has the only active material processing facility in the DOE complex and is one of the sites of choice for nuclear material consolidation. SRS is a logical location to perform maintenance and periodic testing of the DOE fleet of certified packagings. This initiative envisions a DOE Eastern Packaging Staging and Maintenance Center (PSMC) at the SRS and a western hub at the Nevada National Security Site (NNSS), an active DOE Regional Disposal Site. The PSMC's would be the first place DOE would go to meet their radioactive packaging needs and the primary locations projects would go to disposition excess packaging for beneficial reuse. These two hubs would provide the centralized management of a packaging fleet rather than the current approach to design, procure, maintain and dispose of packagings on a project-by-project basis. This initiative provides significant savings in packaging costs and acceleration of project schedules. In addition to certified packaging, the PSMC would be well suited for select designs of 7A Type A packaging and Industrial Packaging. (authors)

England, Jeffery L. [Savannah River National Laboratory, Aiken, South Carolina (United States)] [Savannah River National Laboratory, Aiken, South Carolina (United States); Adams, Karen; Maxted, Maxcine; Ruff Jr, Clarence [U.S. Department of Energy, Savannah River Site, Aiken, SC (United States)] [U.S. Department of Energy, Savannah River Site, Aiken, SC (United States); Albenesius, Andrew; Bowers, Mark D.; Fountain, Geoffrey; Hughes, Michael [Savannah River Nuclear Solutions, Aiken, SC (United States)] [Savannah River Nuclear Solutions, Aiken, SC (United States); Gordon, Sydney [National Security Technologies, LLC, Las Vegas, NV (United States)] [National Security Technologies, LLC, Las Vegas, NV (United States); O'Connor, Stephen [U.S. Department of Energy, HQ DOE, EM-33, Germantown MD (United States)] [U.S. Department of Energy, HQ DOE, EM-33, Germantown MD (United States)

2013-07-01T23:59:59.000Z

27

Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofofOxford SiteToledo SiteTonawandaUniversity21PreparedRffi Prepared3

28

Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofofOxford SiteToledo SiteTonawandaUniversity21PreparedRffi

29

Overview of the Second Quarter 2011 Surveillance and Maintenance Report for the LM Rocky Flats Site  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofofOxford SiteToledo SiteTonawandaUniversity21 theB29.1y8947.1 of the

30

Overview of the Third Quarter 2014 Surveillance and Maintenance Report for the LM Rocky Flats Site  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofofOxford SiteToledo SiteTonawandaUniversity21 theB29.1y8947.1 of the4

31

Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment, April 2011  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG | DepartmentEnergy InvitationLegaltoLiz DorisSitesEnergy11-18 Site:

32

Terms and Conditions for Site Transition - February 2005  

SciTech Connect (OSTI)

A short Department of Energy program document has been created to provide guidance on the transition from the Office of Environmental Management to the newly established Office of Legacy Management.

none,

2005-02-01T23:59:59.000Z

33

Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Amchitka, Alaska, Site  

SciTech Connect (OSTI)

This Long-Term Surveillance and Maintenance Plan describes how the U.S. Department of Energy (DOE) intends to fulfill its mission to maintain protection of human health and the environment at the Amchitka, Alaska, Site1. Three underground nuclear tests were conducted on Amchitka Island. The U.S. Department of Defense, in conjunction with the U.S. Atomic Energy Commission (AEC), conducted the first nuclear test (Long Shot) to provide data that would improve the United States' capability of detecting underground nuclear explosions. The second nuclear test (Milrow) was a weapons-related test conducted by AEC as a means to study the feasibility of detonating a much larger device. The final nuclear test (Cannikin), the largest United States underground test, was a weapons-related test. Surface disturbances associated with these tests have been remediated. However, radioactivity remains deep below the surface, contained in and around the test cavities, for which no feasible remediation technology has been identified. In 2006, the groundwater model (Hassan et al. 2002) was updated using 2005 data collected by the Consortium for Risk Evaluation with Stakeholder Participation. Model simulation results indicate there is no breakthrough or seepage of radionuclides into the marine environment within 2,000 years. The Amchitka conceptual model is reasonable; the flow and transport simulation is based on the best available information and data. The simulation results are a quantitative prediction supported by the best available science and technology. This Long-Term Surveillance and Maintenance Plan is an additional step intended for the protection of human health and the environment. This plan may be modified from time to time in the future consistent with the mission to protect human health

None

2008-09-01T23:59:59.000Z

34

Transition and Closeout of the Former DOE Mound Plant Site: Lessons Learned  

SciTech Connect (OSTI)

The U.S. Department of Energy's (DOE's) Office of Environmental Management (EM) manages the Miamisburg Closure Project (MCP) by cleaning up the Mound site, located in Miamisburg, Ohio, to specific environmental standards, conveying all excess land parcels to the Miamisburg Mound Community Improvement Corporation, and transferring all continuing DOE post-closure responsibilities to the Office of Legacy Management (LM). Presently, the EM cleanup contract of the Mound site with CH2M Hill Mound Inc. is scheduled for completion on March 31, 2006. LM manages the Mound transition efforts and also post-closure responsibilities at other DOE sites via a contract with the S.M. Stoller Corporation. The programmatic transfer from EM to LM is scheduled to take place on October 1, 2006. The transition of the Mound site has required substantial integration and coordination between the EM and LM. Several project management principles have been implemented to help facilitate the transfer of programmatic responsibility. As a result, several lessons learned have been identified to help streamline and improve integration and coordination of the transfer process. Lessons learned from the Mound site transition project are considered a work in progress and have been summarized according to a work breakdown structure for specific functional areas in the transition schedule. The functional areas include program management, environmental, records management, information technology, property management, stakeholder and regulatory relations, procurement, worker pension and benefits, and project closeout. Specific improvements or best practices have been recognized and documented by the Mound transition team. The Mound site is one of three major cleanup sites within the EM organization scheduled for completion in 2006. EM, EM cleanup contractor, LM, and LM post-closure contractor have identified lessons learned during the transition and closure of the Mound site. The transition effort from environmental cleanup to post-closure operations is complex and requires creative and innovative solutions. Future environmental cleanups can benefit from the lessons learned gained by DOE and contractor organizations. (authors)

Carpenter, C. P. [U.S. Department of Energy Office of Legacy Management, Research Ridge 4, MS-K09, 3600 Collins Ferry Road, Morgantown, WV 26507 (United States); Marks, M. L.; Smiley, S.L. [U.S. Department of Energy Office of Environmental Management, Chiquita Building, 250 E. 5 th Street, Cincinnati, OH 45202 (United States); Gallaher, D. M. [S.M. Stoller Corporation, 955 Mound Road, Miamisburg, OH 45342 (United States)

2006-07-01T23:59:59.000Z

35

Site Transition Process Upon Cleanup Completion | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the Americas |DOE FormerEnergy DataPlan Guidance Site

36

Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM)  

Broader source: Energy.gov [DOE]

Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND...

37

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS).

J. L. Smith

2001-01-01T23:59:59.000Z

38

Maintenance Types  

Broader source: Energy.gov [DOE]

Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the...

39

Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the NTS  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Manual M 435.1-1 requires that performance assessments (PAs) and composite analyses (CAs) for low-level waste (LLW) disposal facilities be maintained by the field offices. This plan describes the activities performed to maintain the PA and the CA for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS). This plan supersedes the Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (DOE/NV/11718--491-REV 1, dated September 2002). The plan is based on U.S. Department of Energy (DOE) Order 435.1 (DOE, 1999a), DOE Manual M 435.1-1 (DOE, 1999b), the DOE M 435.1-1 Implementation Guide DOE G 435.1-1 (DOE, 1999c), and the Maintenance Guide for PAs and CAs (DOE, 1999d). The plan includes a current update on PA/CA documentation, a revised schedule, and a section on Quality Assurance.

Vefa Yucel

2007-01-03T23:59:59.000Z

40

Centralized maintenance procedures  

SciTech Connect (OSTI)

In 1989, shortly after Westinghouse Hanford Company (WHC) assumed maintenance responsibilities for the Hanford site, a Department of Energy (DOE) maintenance audit found that field (working level) maintenance procedures and procedure practices of the facilities scattered across Hanford`s 560 square miles varied as greatly as the locations of those facilities. In some of the audited facilities there were few or no procedures; in others, procedures conflicted with or were redundant to procedures at other facilities. This document presents current efforts to centralize maintenance procedures.

Barber, J.R.

1994-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Reactive Maintenance  

Broader source: Energy.gov [DOE]

Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities.

42

Inspection & Maintenance  

E-Print Network [OSTI]

vehicles they own or control: 1. Preventative maintenance/safety inspections at least every 3 to 6 months provides a Preventive Maintenance Check List for guidance and scheduling. 2. If a vehicle is under warranty, Fleet Services will ensure the vehicle has at least the normal preventative, scheduled maintenance

43

Site-wise manipulations and Mott insulator-superfluid transition of interacting photons using superconducting circuit simulators  

E-Print Network [OSTI]

The Bose Hubbard model (BHM) of interacting bosons in a lattice has been a paradigm in many-body physics, and it exhibits a Mott insulator (MI)-superfluid (SF) transition at integer filling. Here a quantum simulator of the BHM using a superconducting circuit is proposed. Specifically, a superconducting transmission line resonator supporting microwave photons is coupled to a charge qubit to form one site of the BHM, and adjacent sites are connected by a tunable coupler. To obtain a mapping from the superconducting circuit to the BHM, we focus on the dispersive regime where the excitations remain photon-like. Standard perturbation theory is implemented to locate the parameter range where the MI-SF transition may be simulated. This simulator allows single-site manipulations and we illustrate this feature by considering two scenarios where a single-site manipulation can drive a MI-SF transition. The transition can be analyzed by mean-field analyses, and the exact diagonalization was implemented to provide accurate results. The variance of the photon density and the fidelity metric clearly show signatures of the transition. Experimental realizations and other possible applications of this simulator are also discussed.

Xiuhao Deng; Chunjing Jia; Chih-Chun Chien

2014-10-30T23:59:59.000Z

44

Predictive Maintenance  

Broader source: Energy.gov [DOE]

Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration.

45

Preventive Maintenance  

Broader source: Energy.gov [DOE]

Preventive maintenance aims to sustain and/or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time.

46

Reliability-Centered Maintenance  

Broader source: Energy.gov [DOE]

Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

47

SITE MAINTENANCE PLAN CSMRI SITE REMEDIATION  

E-Print Network [OSTI]

...............................................................................3 3.2 Bagged Materials Storage Area Management....................................................3...............................................................................................................5 5.2 Ground and Surface Water Monitoring

48

Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNGInternational Energy Agency |AwardJohnson, Steve5,ShiprockPaducahSiteSiteUNITED

49

Monitoring Soil Erosion on a Burned Site in the Mojave-Great Basin Transition Zone: Final Report for the Jacob Fire Site  

SciTech Connect (OSTI)

A historic return interval of 100 years for large fires in the U.S. southwestern deserts is being replaced by one where fires may reoccur as frequently as every 20 to 30 years. The shortened return interval, which translates to an increase in fires, has implications for management of Soil Corrective Action Units (CAUs) and Corrective Action Sites (CASs) for which the Department of Energy, National Nuclear Security Administration Nevada Field Office has responsibility. A series of studies was initiated at uncontaminated analog sites to better understand the possible impacts of erosion and transport by wind and water should contaminated soil sites burn. The first of these studies was undertaken at the Jacob Fire site approximately 12 kilometers (7.5 miles) north of Hiko, Nevada. A lightning-caused fire burned approximately 200 hectares during August 6-8, 2008. The site is representative of a transition between Mojave and Great Basin desert ecoregions on the Nevada National Security Site (NNSS), where the largest number of Soil CAUs/CASs are located. The area that burned at the Jacob Fire site was primarily a Coleogyne ramosissima (blackbrush) and Ephedra nevadensis (Mormon tea) community, also an abundant shrub assemblage in the similar transition zone on the NNSS. This report summarizes three years of measurements after the fire. Seven measurement campaigns at the Jacob Fire site were completed. Measurements were made on burned ridge (upland) and drainage sites, and on burned and unburned sites beneath and between vegetation. A Portable In-Situ Wind Erosion Lab (PI-SWERL) was used to estimate emissions of suspended particles at different wind speeds. Context for these measurements was provided through a meteorological tower that was installed at the Jacob Fire site to obtain local, relevant environmental parameters. Filter samples, collected from the exhaust of the PI-SWERL during measurements, were analyzed for chemical composition. Runoff and water erosion were quantified through a series of rainfall/runoff simulation tests in which controlled amounts of water were delivered to the soil surface in a specified amount of time. Runoff data were collected from understory and interspace soils on burned ridge and drainage areas. Runoff volume and suspended sediment in the runoff were sampled; the particle size distribution of the sediment was determined by laboratory analysis. Several land surface and soil characteristics associated with runoff were integrated by the calculation of site-specific curve numbers. Several vegetation surveys were conducted to assess post-burn recovery. Data from plots in both burned and unburned areas included species identification, counts, and location. Characterization of fire-affected area included measures at both the landscape scale and at specific sites. Although wind erosion measurements indicate that there are seasonal influences on almost all parameters measured, several trends were observed. PI-SWERL measurements indicated the potential for PM10 windblown dust emissions was higher on areas that were burned compared to areas that were not. Among the burned areas, understory soils in drainage areas were the most emissive, and interspace soils along burned ridges were least emissive. By 34 months after the burn (MAB), at the end of the study, emissions from all burned soil sites were virtually indistinguishable from unburned levels. Like the amount of emissions, the chemical signature of the fire (indicated by the EC-Soil ratio) was elevated immediately after the fire and approached pre-burn levels by 24 MAB. Thus, the potential for wind erosion at the Jacob Fire site, as measured by the amount and type of emissions, increased significantly after the fire and returned to unburned levels by 24 MAB. The effect of fire on the potential for water erosion at the Jacob Fire site was more ambiguous. Runoff and sediment from ridge interspace soils and unburned interspace soils were similar throughout the study period. Seldom, if ever, did runoff and sediment occur in burned drainage area soils. Fo

Miller, Julianne [DRI] DRI; Etyemezian, Vic [DRI] DRI; Cablk, Mary E. [DRI] DRI; Shillito, Rose [DRI] DRI; Shafer, David [DOE Grand Junction, Colorado] DOE Grand Junction, Colorado

2013-06-01T23:59:59.000Z

50

Authorized Limits for the Release of a 25 Ton Locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly Facility, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This document contains process knowledge and radiological data and analysis to support approval for release of the 25-ton locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly (EMAD) Facility, located on the Nevada Test Site (NTS). The 25-ton locomotive is a small, one-of-a-kind locomotive used to move railcars in support of the Nuclear Engine for Rocket Vehicle Application project. This locomotive was identified as having significant historical value by the Nevada State Railroad Museum in Boulder City, Nevada, where it will be used as a display piece. A substantial effort to characterize the radiological conditions of the locomotive was undertaken by the NTS Management and Operations Contractor, National Security Technologies, LLC (NSTec). During this characterization process, seven small areas on the locomotive had contamination levels that exceeded the NTS release criteria (limits consistent with U.S. Department of Energy [DOE] Order DOE O 5400.5, ďRadiation Protection of the Public and the EnvironmentĒ). The decision was made to perform radiological decontamination of these known accessible impacted areas to further the release process. On February 9, 2010, NSTec personnel completed decontamination of these seven areas to within the NTS release criteria. Although all accessible areas of the locomotive had been successfully decontaminated to within NTS release criteria, it was plausible that inaccessible areas of the locomotive (i.e., those areas on the locomotive where it was not possible to perform radiological surveys) could potentially have contamination above unrestricted release limits. To access the majority of these inaccessible areas, the locomotive would have to be disassembled. A complete disassembly for a full radiological survey could have permanently destroyed parts and would have ruined the historical value of the locomotive. Complete disassembly would also add an unreasonable financial burden for the contractor. A decision was reached between the NTS regulator and NSTec, opting for alternative authorized limits from DOE Headquarters. In doing so, NSTec personnel performed a dose model using the DOE-approved modeling code RESRAD-BUILD v3.5 to evaluate scenarios. The parameters used in the dose model were conservative. NSTecís Radiological Engineering Calculation, REC-2010-001, ďPublic Dose Estimate from the EMAD 25 Ton Locomotive,Ē concluded that the four scenarios evaluated were below the 25-millirem per year limit, the ďlikelyĒ dose scenarios met the ďfew millirem in a yearĒ criteria, and that the EMAD 25-ton locomotive met the radiological requirements to be released with residual radioactivity to the public.

Jeremy Gwin and Douglas Frenette

2010-04-08T23:59:59.000Z

51

Top Operations and Maintenance (O&M) Efficiency Opportunities at DoD/Army Sites - A Guide for O&M/Energy Managers and Practitioners  

SciTech Connect (OSTI)

This report, sponsored the Army's Energy Engineering Analysis Program, provides the Operations and Maintenance (O&M) Energy manager and practitioner with useful information about the top O&M opportunities consistently found across the DoD/Army sector. The target is to help the DoD/Army sector develop a well-structured and organized O&M program.

Sullivan, Gregory P.; Dean, Jesse D.; Dixon, Douglas R.

2007-05-25T23:59:59.000Z

52

Band gap tuning in transition metal oxides by site-specific substitution  

DOE Patents [OSTI]

A transition metal oxide insulator composition having a tuned band gap includes a transition metal oxide having a perovskite or a perovskite-like crystalline structure. The transition metal oxide includes at least one first element selected form the group of Bi, Ca, Ba, Sr, Li, Na, Mg, K, Pb, and Pr; and at least one second element selected from the group of Ti, Al, V, Cr, Mn, Fe, Co, Ni, Cu, Zr, Nb, Mo, Ru, Rh, Hf, Ta, W, Re, Os, Ir, and Pt. At least one correlated insulator is integrated into the crystalline structure, including REMO.sub.3, wherein RE is at least one Rare Earth element, and wherein M is at least one element selected from the group of Co, V, Cr, Ni, Mn, and Fe. The composition is characterized by a band gap of less of 4.5 eV.

Lee, Ho Nyung; Chisholm, Jr., Matthew F; Jellison, Jr., Gerald Earle; Singh, David J; Choi, Woo Seok

2013-12-24T23:59:59.000Z

53

Ancient Maya Site Planning Principles: A Case Study for the Preclassic/Classic Transition  

E-Print Network [OSTI]

of a site map is a grid map (M) with one meter resolution,86 Figure 5.3 Map gridMapping Form. Figure 5.3. Map Grid Form. inner point taken

Sorensen, Kathryn Ann

2010-01-01T23:59:59.000Z

54

Home Maintenance Manual.  

E-Print Network [OSTI]

they become serious. The accompanying home maintenance plan is one way of setting up a regular inspection program. The checklist suggests maintenance and the best time to inspect. Revise or add to this checklist to meet your needs. HOME MAINTENANCE...

Anonymous,

1985-01-01T23:59:59.000Z

55

Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the Americas |DOE FormerEnergy DataPlan Guidance Site(September

56

HANFORD SITE WELDING PROGRAM SUCCESSFULLY PROVIDING A SINGLE SITE FUNCTION FOR USE BY MULTIPLE CONTRACTORS  

SciTech Connect (OSTI)

The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

CANNELL GR

2009-11-19T23:59:59.000Z

57

Predictive Maintenance Technologies  

Broader source: Energy.gov [DOE]

Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs.

58

Transit Rider Information King County Metro Transit  

E-Print Network [OSTI]

Transit Rider Information King County Metro Transit Rider Information (206) 553-3000 http the On the Move Blog http://www.seattle.gov/transportation King County Road Services Division Road Maintenance closely with King County Metro Transit, the Seattle School District, local universities, hospitals

Queitsch, Christine

59

Long-Term Surveillance and Maintenance at the Rocky Flats Site: Lessons Learned Based on the First Years¬ź Real Experiences From the Field  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't Happen toLeveragingLindseyLong-Term Storage ofSites |Sites |08

60

Transition Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

and training needs for system operation and maintenance, planning for data migration, etc Transition Plan More Documents & Publications System Design Feasibility Study Report...

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Mining Surveillance and Maintenance Dollars  

SciTech Connect (OSTI)

Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

MARTINEZ, R.

2000-02-01T23:59:59.000Z

62

Computerized Maintenance Management Systems  

Broader source: Energy.gov [DOE]

Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

63

Optimizing Preventive Maintenance Models  

E-Print Network [OSTI]

Optimizing Preventive Maintenance Models. Michael Bartholomew-Biggs. School of Physics Astronomy and Mathematics, University of Hertfordshire.

64

site_transition.cdr  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf TheViolationsRio Blanco ResponsibleSuiteFrom:QER SFair ActPage

65

HVAC Maintenance and Technologies  

Broader source: Energy.gov [DOE]

Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

66

Sandia National Laboratories: Test Site Operations & Maintenance...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Generator Modeling Radar Friendly Blades Special Programs Techno-Economic Modeling, Analysis, and Support Analysis, Modeling, Cost of Energy, and Policy Impact: Wind Vision 2014...

67

Low-level radioactive waste management: transitioning to off-site disposal at Los Alamos National Laboratory  

SciTech Connect (OSTI)

Facing the closure of nearly all on-site management and disposal capability for low-level radioactive waste (LLW), Los Alamos National Laboratory (LANL) is making ready to ship the majority of LLW off-site. In order to ship off-site, waste must meet the Treatment, Storage, and Disposal Facility's (TSDF) Waste Acceptance Criteria (WAC). In preparation, LANL's waste management organization must ensure LANL waste generators characterize and package waste compliantly and waste characterization documentation is complete and accurate. Key challenges that must be addressed to successfully make the shift to off-site disposal of LLW include improving the detail, accuracy, and quality of process knowledge (PK) and acceptable knowledge (AK) documentation, training waste generators and waste management staff on the higher standard of data quality and expectations, improved WAC compliance for off-site facilities, and enhanced quality assurance throughout the process. Certification of LANL generators will allow direct off-site shipping of LLW from their facilities.

Dorries, Alison M [Los Alamos National Laboratory

2010-11-09T23:59:59.000Z

68

2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites  

SciTech Connect (OSTI)

This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

None

2013-11-01T23:59:59.000Z

69

Maintenance implementation plan for the B Plant/WESF. Revision 4  

SciTech Connect (OSTI)

This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B Plant, but several of its operating systems are required to accomplish the current B Plant/WESF mission. B Plant/WESF are each considered a nuclear facility due to the storage of cesium and strontium capsules at WESF and the large radiological inventory from past processing.

Tritt, S.E.; Lueck, B.H.

1996-01-01T23:59:59.000Z

70

Operations and Maintenance Program Structure  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

71

CRAD, Maintenance Assessment Plan  

Broader source: Energy.gov [DOE]

An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations.

72

Associate Vice Chancellor Maintenance  

E-Print Network [OSTI]

Engineering Capital Planning & Design Carpentry Shop Electrical Shop Plumbing Shop HVAC Shop Housing Shop Equipment & Vehicle Maintenance Warehouse Vehicle Pool Shuttle Post Office Parking Services Contract Management Water Distribution Heat & Power Generation Heat Distribution Power Distribution December 2012

Hartman, Chris

73

Seasonal Landscape Maintenance  

E-Print Network [OSTI]

Seasonal Landscape Maintenance Oklahoma State University, in compliance with Title VI and VII State University's Department of Horticulture and Landscape Architecture and Oklahoma Cooperative to dry between watering allows plants to develop stronger, deeper roots. However, some landscape plants

Balasundaram, Balabhaskar "Baski"

74

Erosion Potential of a Burn Site in the Mojave-Great Basin Transition Zone: Interim Summary of One Year of Measurements  

SciTech Connect (OSTI)

A historic return interval of 100 years for large fires in deserts in the Southwest U.S. is being replaced by one where fires may reoccur as frequently as every 20 to 30 years. This increase in fires has implications for management of Soil Sub-Project Corrective Action Units (CAUs) for which the Department of Energy, National Nuclear Security Administration Nevada Site office (NNSA/NSO) has responsibility. A series of studies has been initiated at uncontaminated analog sites to better understand the possible impacts of erosion and transport by wind and water should contaminated soil sites burn over to understand technical and perceived risk they might pose to site workers and public receptors in communities around the NTS, TTR, and NTTR; and to develop recommendations for stabilization and restoration after a fire. The first of these studies was undertaken at the Jacob fire, a lightning-caused fire approximately 12 kilometers north of Hiko, Nevada, that burned approximately 200 ha between August 6-8, 2008, and is representative of a transition zone on the NTS between the Mojave and Great Basin Deserts, where the largest number of Soil Sub-Project CAUs/CASs are located.

V. Etyemezian, D. Shafer, J. Miller, I. Kavouras, S. Campbell, D. DuBois, J. King, G. Nikolich, and S. Zitzer

2010-05-18T23:59:59.000Z

75

Proactive maintenance initiatives at Argonne National Laboratory-West  

SciTech Connect (OSTI)

In the late 1980`s, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ``mentor`` roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I&C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned.

Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

1995-06-01T23:59:59.000Z

76

A formal ontology for industrial maintenance  

E-Print Network [OSTI]

strategies (preventive maintenance, predictive maintenance, corrective maintenance), to managing operators1 A formal ontology for industrial maintenance Authors: 1- Dr. Mohamed Hedi KARRAY, LGP The rapid advancement of information and communication technologies has resulted in a variety of maintenance

Boyer, Edmond

77

Operations and maintenance philosophy  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

DUNCAN, G.P.

1999-10-28T23:59:59.000Z

78

CH Packaging Maintenance Manual  

SciTech Connect (OSTI)

This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests.

Washington TRU Solutions

2002-01-02T23:59:59.000Z

79

Second Line of Defense Help Desk: Electronic Maintenance Reports - Local Maintenance Provider User Guide Rev. 1  

SciTech Connect (OSTI)

The Electronic Maintenance Report forms present a uniform dataset for analysis of Sustainability metrics. These forms collect readily minable data while allowing the attachment of site-specific checklists or other supporting files for review by the Sustainability Manager and Program Management.

Leigh, Richard J.

2011-12-14T23:59:59.000Z

80

2003 Long-Term Surveillance and Maintenance Program Report  

SciTech Connect (OSTI)

Radioactive waste was created by the Federal Government and private industry at locations around the country in support of national defense, research, and civilian power-generation programs. If not controlled, much of this legacy waste would remain hazardous to human health and the environment indefinitely. Current technology does not allow us to render this waste harmless, so the available methods to control risk rely on consolidation, isolation, and long-term management of the waste. The U.S. Department of Energy (DOE) has an obligation to safely control the radioactive waste and to inform and train future generations to maintain and, perhaps, improve established protections. DOE is custodian for much of the radioactive and other hazardous waste under control of the Federal Government. DOE established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 and the Defense Decontamination and Decommissioning (D&D) Program and the Surplus Facilities Management Program in the 1980s. Congress passed the Uranium Mill Tailings Radiation Control Act (UMTRCA) in 1978. These federal programs and legislation were established to identify, remediate, and manage legacy waste. Remedial action is considered complete at a radioactive waste site when the identified hazardous material is isolated and the selected remedial action remedy is in place and functioning. Radioactive or other hazardous materials remain in place as part of the remedy at many DOE sites. Long-term management of radioactive waste sites incorporates a set of actions necessary to maintain protection of human health and the environment. These actions include maintaining physical impoundment structures in good repair to ensure that they perform as designed, preventing exposure to the wastes by maintaining access restrictions and warnings, and recording site conditions and activities for future custodians. Any actions, therefore, that will prevent exposure to the radioactive waste now or in the future are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOEís responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nationís nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOEís legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LMĖ50), as well as management of remedies involving ground water and surface water contaminated by former processing activities.

None

2004-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Proposed SOLCOST maintenance activities  

SciTech Connect (OSTI)

This document provides a short description of work that has been accomplished to date and work in progress. A discussion of the program status as it is currently configured follows and finally proposed work by Solar Environmental Engineering Company (SEEC) in its most recently signed contract with the Department of Energy (DOE) is given. Early statements are designed to give the reader a good background so that the suggested SOLCOST maintenance activities will be more easily understood.

none,

1980-01-01T23:59:59.000Z

82

E-Print Network 3.0 - active site determination Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Geophysics, Center for Rock Abuse Collection: Fossil Fuels ; Geosciences 7 SITE MAINTENANCE PLAN CSMRI SITE REMEDIATION Summary: CSMRI SITE REMEDIATION 1.0 HISTORY ...

83

Nitrous Oxide Systems Maintenance in Clinical Areas  

E-Print Network [OSTI]

. It specifically speaks to maintenance of nitrous oxide delivery systems, preventive maintenance for house. Arrange with Facilities for regular preventive maintenance and annual performance check of ventilation). b. Provides preventive maintenance on ventilation system as necessary. c. Coordinates annual

Jia, Songtao

84

Scheduling with Fixed Maintenance, Shared Resources and ...  

E-Print Network [OSTI]

Nov 17, 2014 ... maintenance constraints, blending and shared resources. ...... tegrated fixed time interval preventive maintenance and production for schedul-.

2015-02-07T23:59:59.000Z

85

Africa's Transport Infrastructure Mainstreaming Maintenance and...  

Open Energy Info (EERE)

Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management...

86

Genepool Quarterly Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky Learning Fun withGenepool Quarterly MaintenanceGenepool

87

Operations & Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOilOnlineandOperations and Maintenance

88

Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness  

SciTech Connect (OSTI)

This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

Vesely, W.E.; Rezos, J.T. [Science Applications International Corp., Dublin, OH (United States)

1995-09-01T23:59:59.000Z

89

Development of a maintenance program  

SciTech Connect (OSTI)

Bruce Nuclear Generating Station (NGS) A in Tiverton, Ontario, has been operating for 10 yr. One reason for its successful operating record is the development of an effective preventive maintenance program. Evaluation of the existing preventive program included a review of maintenance of selected key equipment over the life of the station. The review emphasized the need to improve the storage and sorting of maintenance information for trend and cost analysis, manpower planning, reliability, and radiation dose calculations.

Walker, I.

1987-01-01T23:59:59.000Z

90

Decontamination and decommissioning surveillance and maintenance report for FY 1991  

SciTech Connect (OSTI)

The Decontamination and Decommissioning (D D) Program has three distinct phases: (1) surveillance and maintenance (S M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D D is devoted to S M at each of the sites. Our S M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

Not Available

1991-12-01T23:59:59.000Z

91

Landscape Maintenance Considerations for Homeowner  

E-Print Network [OSTI]

Landscape Maintenance Considerations for Homeowner Associations: Save Money, Be Safe, Look Good is getting their money's worth from the landscape maintenance company. Photo credit: Asset Landscaping! Kelly Murray Young Haley Paul #12;1. Consider landscape plants a long- term investment · Trees

Sanderson, Mike

92

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS&M) of remediated FUSRAP sites. DOE LTS&M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS&M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS&M.

Clayton, Christopher [U.S. Department of Energy Office of Legacy Management, Washington, DC; Kothari, Vijendra [U.S. Department of Energy Office of Legacy Management, Morgantown, West Virginia; Starr, Ken [U.S. Department of Energy Office of Legacy Management, Westminster, Colorado; Gillespie, Joey [S.M. Stoller Corporation, Contractor for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado; Widdop, Michael [S.M. Stoller Corporation, Contractor for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado; none,

2012-02-26T23:59:59.000Z

93

Asphalt, Concrete, and Turf Maintenance and Preservation  

E-Print Network [OSTI]

preventive maintenance, pavement distress and identification, and best practices for the maintenance Consultant WSB and Associates, Inc. 763-287-7184 jstewart@wsbeng.com #12;2 Preventive Maintenance Preventive maintenance and minor rehab, and is often used to repair environmental damage. Preventive maintenance narrows

Minnesota, University of

94

TRUPACT-II Operating and Maintenance Instructions  

SciTech Connect (OSTI)

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

Westinghouse Electric Corporation, Waste Isolation Division

1999-12-31T23:59:59.000Z

95

Pertechnetate (TcO4-) reduction by reactive ferrous iron forms in naturally anoxic, redox transition zone sediments from the Hanford Site, USA  

SciTech Connect (OSTI)

Technetium is an important environmental contaminant introduced by the processing and disposal of irradiated nuclear fuel and atmospheric nuclear tests. Under oxic conditions technetium is soluble and exists as pertechnatate anion (TcO4-), while under anoxic conditions Tc is usually insoluble and exists as precipitated Tc(IV). Here we investigated abiotic Tc(VII) reduction in mineralogically heterogeneous, Fe(II)-containing sediments. The sediments were collected from a 55 m borehole that sampled a semi-confined aquifer at the Hanford Site, USA that contained a dramatic redox transition zone. One oxic facies (18.0-18.3 m) and five anoxic facies (18.3-18.6 m, 30.8-31.1 m, 39.0-39.3 m, 47.2-47.5 m and 51.5-51.8 m) were selected for this study. Chemical extractions, X-ray diffraction, electron microscopy, and MŲssbauer spectroscopy were applied to characterize the Fe(II) mineral suite that included: Fe(II)-phyllosilicates, pyrite, magnetite and siderite. The Fe(II) mineral phase distribution differed between the sediments. Sediment suspensions were adjusted to the same 0.5 M HCl extracted Fe(II) concentration (0.6 mM) for Tc(VII) reduction experiments. Aqueous Fe was low in all sediment suspensions (<2 ?M) and below the Fe(II)aq detection limit (10 ?M). Technetium(VII) reduction occurred in all anoxic sediments at depths greater than 18.3 m and reaction time differed significantly between the sediments (8-219 d). MŲssbauer analysis of the Tc-reacted, 30.8-31.1 m sediment confirmed that Tc(VII) was reduced by solid-phase Fe(II), with siderite and Fe(II)-containing phyllosilicates implicated as redox reactive phases. Technetium-XAS analysis demonstrated that Tc associated with sediments was in the Tc(IV) valence state and immobilized as clusters of a TcO2∑nH2O-like phase. The speciation of redox product Tc(IV) was not affected by reduction rate or Fe(II) mineralogy.

Peretyazhko, Tetyana; Zachara, John M.; Kukkadapu, Ravi K.; Heald, Steve M.; Kutnyakov, Igor V.; Resch, Charles T.; Arey, Bruce W.; Wang, Chong M.; Kovarik, Libor; Phillips, Jerry L.; Moore, Dean A.

2012-09-01T23:59:59.000Z

96

Programmatic agreement among the USDOE/RL Operations Office, the Advisory Council on Historic Preservation, and the WA State Historic Preservation Office for the maintenance, deactivation, alteration and demolition of the built environment on the Hanford Site, Washington  

SciTech Connect (OSTI)

This Programmatic Agreement (PA) addresses the built environment (i.e., buildings and structures) constructed during the Manhattan Project and Cold War Era periods of Hanford`s operational history. As such it encompasses the years 1943 through 1990. The identification, evaluation, and treatment of buildings and historic archeological remains on the Hanford Site predating 1943 will be accomplished through Sections 800.4 through 800.6 of the Council`s regulations. This PA will be in effect from the date of signature until September 30, 2000. Completion of the Sitewide Treatment Plan established under this PA satisfies all Section 106 requirements for identification, evaluation, and treatment necessary for all undertakings, up to and including demolition which may affect Manhattan Project and Cold War Era properties. This PA may be extended if the Sitewide Treatment Plan has not been completed by the end of FY 2000. Identification, evaluation, and treatment of properties constructed on the Hanford Site after 1990 will be handled pursuant to the regulations in effect at the time such properties are eligible for review.

Lloyd, D.W.

1997-08-01T23:59:59.000Z

97

Operations and Maintenance Program Measurement  

Broader source: Energy.gov [DOE]

Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a...

98

Maintenance Practices for LED Streetlights  

Broader source: Energy.gov [DOE]

This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

99

Maintenance FUSION IGNITION RESEARCH EXPERIMENT  

E-Print Network [OSTI]

Insulation Enclosure Remote Maintenance Module FUSION IGNITION RESEARCH EXPERIMENT SYSTEM describes the status of the configuration development and the integration of the major subsystem components vessel structural stiffness, this configuration makes use of the cooling jacket as nuclear shielding

100

Categorical Exclusion for Maintenance Work  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Work along the Electrical District 5 to Saguaro segment (414 to 585) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal...

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Operations and Maintenance Management Support  

Broader source: Energy.gov [DOE]

Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows...

102

Business Development - Predictive Maintenance Products  

E-Print Network [OSTI]

BUSINESS DEVELOPMENT - PREDICTIVE MAINTENANCE PRODUCTS Phillip Sceiczina, ifm efector, inc. In this time of global competitiveness, more companies are focusing on reducing manufacturing costs to increase profits. Energy costs can be a...

Sceiczina, P.

2005-01-01T23:59:59.000Z

103

Sustainable Operations & Maintenance Implementation Support  

E-Print Network [OSTI]

, and purchasing policy: Energy efficiency cannot exist without accountability and organizational support energy efficiency in buildings. Organizational innovation for energy conservation; Organizations face of energy efficiency. Meetings with facilities personnel, maintenance staff, building managers, building oc

104

Turfgrass: Maintenance Costs in Texas.  

E-Print Network [OSTI]

. These regions also have high water costs. The Gulf Coast, where water is a minor item, has an average expenditure only slightly greater than half that in West Texas. Average lawn sizes in these two regions are almost identical. Use of com- post, commercial.... Individuals with grasses other than bermuda and St. Augustine spend on the average about 53 percent TARLE 2. TOTALS OF VARIOUS HOME LAWN MAINTENANCE EXPENDITURES WITHIN REGIONS AND FOR THE STATE1 Number of Maintenance items Region households Commercial...

Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

1964-01-01T23:59:59.000Z

105

Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3  

SciTech Connect (OSTI)

This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP`s current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes.

Meldrom, C.A.

1996-03-01T23:59:59.000Z

106

Dynamic Scheduling of Maintenance Activities Under Uncertainties  

E-Print Network [OSTI]

of the required treatment. There are mainly two types of maintenance activities: the preventive maintenance, whoseDynamic Scheduling of Maintenance Activities Under Uncertainties Fran¬łcois Marmier, Christophe in maintenance services field where the different practical knowledges or skills are their working tools. We

Paris-Sud XI, Université de

107

Chapter 6.14 PROPERTY MAINTENANCE  

E-Print Network [OSTI]

Chapter 6.14 PROPERTY MAINTENANCE Sections: 6.14.010 Findings. 6.14.020 Landscape Maintenance. 6 of landscaping and/or landscape maintenance on private property, including overgrown, dead, or decayed vegetation of the residents of the City of Riverside. (Ord. 6970 § 2, 2007) Section 6.14.020 Landscape maintenance. A

Lyubomirsky, Ilya

108

Operations and Maintenance Manual for Large Aperture Scanner System  

SciTech Connect (OSTI)

Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

Jones, Anthony M.; Hall, Thomas E.

2010-04-08T23:59:59.000Z

109

100,000-Mile Evaluation of Transit Buses Operated on Biodiesel Blends (B20)  

SciTech Connect (OSTI)

Evaluates the emissions, fuel economy, and maintenance of five 40-foot transit buses operated on B20 compared to four on petroleum diesel.

Proc, K.; Barnitt, R.; Hayes, R. R.; Ratcliff, M.; McCormick, R. L.; Ha, L.; Fang, H. L.

2006-11-01T23:59:59.000Z

110

On-Site Wastewater Treatment Systems: Constructed Wetland Media  

E-Print Network [OSTI]

This publication explains the functions, characteristics, choices, configurations and maintenance needs for constructed wetland media in on-site wastewater treatment systems....

Lesikar, Bruce J.; Weaver, Richard; Richter, Amanda; O'Neill, Courtney

2005-02-19T23:59:59.000Z

111

Opportune maintenance and predictive maintenance decision support douard Thomas, ric Levrat, Benoit Iung, Pierre Cocheteux  

E-Print Network [OSTI]

: When to perform a particular maintenance action? What components should benefit from a preventive maintenance action? Which components should first benefit from a preventive maintenance interventionOpportune maintenance and predictive maintenance decision support √?douard Thomas, √?ric Levrat

Paris-Sud XI, Université de

112

Airline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches  

E-Print Network [OSTI]

-based. The preventative alternative involves the transmission of maintenance data to maintenance personnel whenAirline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches Mike Dupuy, Dan Wesely, Cody Jenkins Abstract ­ Airline maintenance is a significant contributor

113

Iron production maintenance effectiveness system  

SciTech Connect (OSTI)

In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

Augstman, J.J. [Dofasco Inc., Hamilton, Ontario (Canada)

1996-12-31T23:59:59.000Z

114

STANDARD OPERATING PROCEDURES Site Selection  

E-Print Network [OSTI]

IMPROVE STANDARD OPERATING PROCEDURES SOP 126 Site Selection Date Last Modified Modified by: 09 References none #12;SOP 126: Site Selection 3 1.0 PURPOSE AND APPLICABILITY This standard operating procedure field conditions, and for ease of operation and maintenance. IMPROVE aerosol samplers are generally

Fischer, Emily V.

115

Dynamic Maintenance of Service Orchestrations  

E-Print Network [OSTI]

-Rocquencourt, France Valérie Issarny INRIA Paris-Rocquencourt, France ABSTRACT Service-oriented architectures evolved/orchestration of services. One of the next challenges in this field is the maintenance of service-oriented architectures orchestrations. 1. INTRODUCTION Service Oriented Architecture (SOA) is an architectural style that emerged

Boyer, Edmond

116

Progress on Footprint Reduction at the Hanford Site - 12406  

SciTech Connect (OSTI)

The Department of Energy (DOE) Office of Environmental Management (EM) continues to reduce the footprint of legacy sites throughout the EM complex. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess contaminated facilities, soil and groundwater remediation, and solid waste disposition. All of these initiatives are being accomplished with established technologies in proven regulatory frameworks. Ultimately, completion of these environmental cleanup activities will reduce the monitoring and maintenance costs associated with managing large federal facilities, allowing EM to place more focus on other high priority cleanup efforts and facilitate a successful transition to land-term stewardship of these sites. Through the American Recovery and Reinvestment Act (ARRA) investment, the Department's cleanup footprint has been reduced by 45 percent to date, from 2411 km{sup 2} (931 mi{sup 2}) to 1336 km{sup 2} (516 mi{sup 2}s). With this significant progress on footprint reduction, the Department is on track towards their goal to reduce its overall footprint by approximately 90 percent by 2015. In addition, some areas cleaned up may become available for alternate uses (i.e. recreation, conservation, preservation, industrialization or development). Much of the work to reduce the complex's footprint occurred at the Savannah River Site in South Carolina and the Hanford Site in Washington, but cleanup continues across the complex. Footprint reduction is progressing well at the Hanford Site, supported predominantly through ARRA investment. To date, 994 km{sup 2} (384 mi{sup 2}) (65%) of footprint reduction have been achieved at Hanford, with a goal to achieve a 90% reduction by Fiscal Year 2015. The DOE EM and DOE Richland Operations Office, continue to make great progress to reduce the legacy footprint of the Hanford Site. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess facilities, both contaminated and uncontaminated, waste site cleanup activities, and debris pile removal. All of these activities can be accomplished with proven technologies and within established regulatory frameworks. Footprint reduction goals for Fiscal Year 2011 were exceeded, largely with the help of ARRA funding. As cleanup projects are completed and the total area requiring cleanup shrinks, overall costs for surveillance and maintenance operations and infrastructure services decrease. This work completion and decrease in funding requirements to maintain waste sites and antiquated facilities allows more focus on high priority site missions (i.e. groundwater remediation, tank waste disposition, etc.) and moves Site areas closer to transition from EM to the Legacy Management program. The progress in the Hanford footprint reduction effort will help achieve success in these other important mission areas. (authors)

McKenney, Dale E. [CH2M HILL, Plateau Remediation Company, Richland, Washington 99352 (United States); Seeley, Paul [Cenibark International, Inc., Richland, Washington 99352 (United States); Farabee, Al [U.S. Department of Energy, Richland Operations Office, Richland, Washington 99352 (United States)

2012-07-01T23:59:59.000Z

117

Study of Alternative Approaches for Transite Panel Removal |...  

Broader source: Energy.gov (indexed) [DOE]

(BJC) assembled an experienced team from both sites to evaluate both the manual and mechanical methods of transite panel removal. Study of Alternative Approaches for Transite...

118

Invertible Program Restructurings for Continuing Modular Maintenance  

E-Print Network [OSTI]

Invertible Program Restructurings for Continuing Modular Maintenance Julien Cohen ASCOLA team (EMN in main- tenance with invertible program transformations. We illustrate this on the typical Expression problems with our approach. Keywords-modular maintenance; restructuring; invertible pro- gram

Paris-Sud XI, Université de

119

Effects of dairy intake on weight maintenance  

E-Print Network [OSTI]

, randomized trial. Weight loss was baseline to 3 months, weight maintenance was 4 to 9 months. Participants were maintained randomly assigned to low dairy ( 3 servings/d) diets for the maintenance phase. Three...

Zemel, Michael B.; Donnelly, Joseph E.; Smith, Bryan K.; Sullivan, Debra K.; Richards, Joanna; Morgan-Hanusa, Danielle; Mayo, Matthew S.; Sun, Xiaocun; Cook-Wiens, Galen; Bailey, Bruce W.; Van Walleghen, Emily L.; Washburn, Richard A.

2008-10-24T23:59:59.000Z

120

Maintenance Assessment Plan - Developed By NNSA/Nevada Site Office...  

Broader source: Energy.gov (indexed) [DOE]

O 433.1 DOE Order 425.1C, Startup and Restart of Nuclear Facilities DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities DOE Order 5480.20A, Personnel...

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

On-Site Wastewater Treatment Systems: Operation and Maintenance (Spanish)  

E-Print Network [OSTI]

adicional a las aguas negras antes de enviarlas al suelo. Si las aguas negras no se tratan adecuadamente antes de que lleguen al agua subterr?nea, el pozo de agua de su casa podr?a contaminarse. Existe una excepci?n a la regla de que todas las aguas negras...

Lesikar, Bruce J.; Enciso, Juan

2000-08-15T23:59:59.000Z

122

PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE | Department  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDieselEnergyHistoryWATER-ENERGYof Energy

123

Sandia National Laboratories: Test Site Operations & Maintenance Safety:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErikGroundbreakingStandardsTCES Sandia Researchers WinTVA

124

Sandia National Laboratories: Test Site Operations & Maintenance Safety:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErikGroundbreakingStandardsTCES Sandia Researchers WinTVATest Facilities Capital

125

Maintenance and Prevention: Formalization and Fixpoint Characterization  

E-Print Network [OSTI]

Maintenance and Prevention: Formalization and Fixpoint Characterization Munindar P. Singh Maintenance and prevention are important concepts in the science of intel­ ligent systems, yet serious research attention. Maintenance and prevention are duals of each other, but cannot be reduced

126

ROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE  

E-Print Network [OSTI]

activities: the preventive maintenance, whose activities can be long term planned, and the correctiveROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE François MARMIER , Christophe VARNIER. Especially in the field of maintenance services where the different practical knowledge or skills

Paris-Sud XI, Université de

127

Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing  

E-Print Network [OSTI]

1 Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing Xiaodong Yao, Emmanuel on Control Applications in 2001. #12;2 Abstract Preventive Maintenance (PM) scheduling is a very challenging schedule with that of a baseline reference schedule are also presented. Index Terms preventive maintenance

Marcus, Steven I.

128

Prognostics for the Maintenance of Distributed Systems  

E-Print Network [OSTI]

but also higher level function prognosis. I. INTRODUCTION In the classical case, preventive maintenance of preventive maintenance for complex systems. In this sense, a distributed system can be split down into a setPrognostics for the Maintenance of Distributed Systems Pauline Ribot, Yannick Pencol¬īe and Michel

Pencolé, Yannick

129

Laboratory services series: a programmed maintenance system  

SciTech Connect (OSTI)

The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

Tuxbury, D.C.; Srite, B.E.

1980-01-01T23:59:59.000Z

130

Designing a scrubber for maintenance  

SciTech Connect (OSTI)

Under Round 4 of the U.S. Department of Energy`s (DOE) Clean Coal Technology program, New York State Electric & Gas Corporation (NYSEG), in partnership with Saarberg-Holter-Umwelttechnik (SHU), Consolidation Coal Company and Stebbins Engineering and Manufacturing Company, has retrofitted a formic acid enhanced forced oxidation wet limestone scrubber on Units I and 2 at the Milliken Steam Electric Station. Units I and 2 are 1950s vintage Combustion Engineering tangentially fired pulverized coal units, which are rated at nominal 150 MW each and operate in balanced draft mode. The Flue Gas Desulfurization (FGD) system for Unit 2 was placed into operation in January 1995 and the Unit I system in June 1995. The project incorporates several unique aspects: low pH operation; a ceramic tile-lined cocurrent/countercurrent, split module absorber; a wet stack supported on the roof of the FGD building; and closed loop, zero liquid discharge operation that produces commercial grade gypsum and calcium chloride brine. The project objectives include 98% SO{sub 2} removal efficiency while burning high sulfur coal, the production of marketable byproducts to minimize solid waste disposal, zero wastewater discharge, space-saving design, and minimization of maintenance requirements of a wet scrubber. The paper provides a brief overview of the project scrubber design relating to maintenance considerations. A discussion of the early results of the maintenance history is also provided. Repair techniques that have been developed and tested for ceramic tile lined modules are included. 1 fig.

Mahlmeister, M.E.; Baron, E.S. [New York State Electric and Gas Corp., Binghamton, NY (United States); Watts, J. [USDOE Pittsburgh Energy Technology Center, PA (United States)

1996-12-01T23:59:59.000Z

131

Preventative Maintenance (PM) Policy Outline the policy regarding preventative vehicle maintenance on University of Michigan (U-  

E-Print Network [OSTI]

Preventative Maintenance (PM) Policy Objective Outline the policy regarding preventative vehicle maintenance on University of Michigan (U- M) vehicles. Policy 1. All maintenance performed on U-M vehicles their own campus maintenance facility to repair their fleet vehicles. 2. To ensure proper stewardship of U

Kirschner, Denise

132

Vehicle Maintenance Policy Outline the policy regarding vehicle maintenance at University of Michigan (U-M).  

E-Print Network [OSTI]

Vehicle Maintenance Policy Objective Outline the policy regarding vehicle maintenance at University of Michigan (U-M). Policy 1. All maintenance performed on U-M vehicles must be coordinated through Garage to repair their fleet vehicles. 2. U-M vehicles leased through Fleet Services include routine maintenance

Kirschner, Denise

133

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

134

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

135

Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao  

E-Print Network [OSTI]

Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao SAS Institute Inc. Cary preventive maintenance (PM) and production policies for an unreliable production-inventory system in which to establish some additional structural properties. Keywords: optimal preventive maintenance, joint maintenance

Marcus, Steven I.

136

A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling Problem in the Robustness  

E-Print Network [OSTI]

A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling production and Preventive Maintenance (PM) scheduling problem in the robustness framework. The contributions equipment reliability and performance loss under disruption Key words: Production, Preventive maintenance

Paris-Sud XI, Université de

137

No maintenance -- no energy efficiency  

SciTech Connect (OSTI)

Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

1994-12-01T23:59:59.000Z

138

National Fuel Cell Bus Program: Accelerated Testing Evaluation Report and Appendices, Alameda-Contra Costa Transit District (AC Transit)  

SciTech Connect (OSTI)

This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006 compared to similar diesel buses operating from the same depot. This evaluation report includes results from November 2007 through October 2008. Evaluation results include implementation experience, fueling station operation, fuel cell bus operations at Golden Gate Transit, and evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and roadcalls).

Chandler, K.; Eudy, L.

2009-01-01T23:59:59.000Z

139

Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3  

SciTech Connect (OSTI)

The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

Leigh, Richard J.

2012-09-01T23:59:59.000Z

140

The Evolution of LTS at DOE's Hanford Site  

SciTech Connect (OSTI)

Hanford's Long-Term Stewardship (LTS) Program has evolved from a small, informal process, with minimal support, to a robust program that provides comprehensive transitions from cleanup contractors to long-term stewardship for post-cleanup requirements specified in the associated cleanup decision documents. The LTS Program has the responsibility for almost 100,000 acres of land, along with over 200 waste sites and will soon have six cocooned reactors. Close to 2,600 documents have been identified and tagged for storage in the LTS document library. The program has successfully completed six consecutive transitions over the last two years in support of the U.S. DOE Richland Operations Office's (DOE-RL) near-term cleanup objectives of significantly reducing the footprint of active cleanup operations for the River Corridor. The program has evolved from one that was initially responsible for defining and measuring Institutional Controls for the Hanford Site, to a comprehensive, post remediation surveillance and maintenance program that begins early in the transition process. In 2013, the first reactor area -- the cocooned 105-F Reactor and its surrounding 1,100 acres, called the F Area was transitioned. In another first, the program is expected to transition the five remaining cocooned reactors into the program through using a Transition and Turnover Package (TTP). As Hanford's LTS Program moves into the next few years, it will continue to build on a collaborative approach. The program has built strong relationships between contractors, regulators, tribes and stakeholders and with the U.S. Department of Energy's Office of Legacy Management (LM). The LTS Program has been working with LM since its inception. The transition process utilized LM's Site Transition Framework as one of the initial requirement documents and the Hanford Program continues to collaborate with LM today. One example of this collaboration is the development of the LTS Program's records management system in which, LM has been instrumental. The development of a rigorous data collection and records management systems has been influenced and built off of LMs success, which also ensures compatibility between what Hanford's LTS Program develops and LM. In another example, we are exploring a pilot project to ship records from the Hanford Site directly to LM for long-term storage. This pilot would gain program efficiencies so that records would be handled only once. Rather than storage on-site, then shipment to an interim Federal Records Center in Seattle, records would be shipped directly to LM. The Hanford LTS Program is working to best align programmatic processes, find efficiencies, and to benchmark site transition requirements. Involving the Hanford LTS Program early in the transition process with an integrated contractor and DOE team is helping to ensure that there is time to work through details on the completed remediation of transitioning areas. It also will allow for record documentation and storage for the future, and is an opportunity for the program to mature through the experiences that will be gained by implementing LTS Program activities over time.

Moren, Richard J. [Mission Support Alliance, Richland, WA (United States); Grindstaff, Keith D. [USDOE Richland Operations Office, Richland, WA (United States)

2013-11-12T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Decontamination and decommissioning surveillance and maintenance report for FY 1991. Environmental Restoration Program  

SciTech Connect (OSTI)

The Decontamination and Decommissioning (D&D) Program has three distinct phases: (1) surveillance and maintenance (S&M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D&D is devoted to S&M at each of the sites. Our S&M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S&M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

Not Available

1991-12-01T23:59:59.000Z

142

Optimization Online - Optimizing Preventive Maintenance Models  

E-Print Network [OSTI]

Jun 29, 2004 ... Abstract: We deal with the problem of scheduling preventive maintenance (PM) by minimizing a performance function which reflects repair and†...

Michael Bartholomew-Biggs

2004-06-29T23:59:59.000Z

143

BPAT Systems Maintenance - February 9, 2015  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 292015 BPAT's...

144

BPAT Systems Maintenance - December 12, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 12122014 BPAT's...

145

BPAT Systems Maintenance - November 5, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 1152014 BPAT's...

146

FAQS Reference Guide Ė Facility Maintenance Management  

Broader source: Energy.gov [DOE]

This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

147

Scheduling with Fixed Maintenance, Shared Resources and ...  

E-Print Network [OSTI]

Nov 30, 2014 ... Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: a Mine Planning Case Study. Christina N Burt†...

Christina N Burt

2014-11-30T23:59:59.000Z

148

Maintenance implementation plan for B Plant  

SciTech Connect (OSTI)

The B Plant facility, is located in the 200 East Area at the Hanford Site in south-central Washington State. It consists of two major operating areas: the B Plant Canyon Building, and the Waste Encapsulation and Storage Facility (WESF). The B Plant was originally designed to chemically process spent nuclear fuels. After this initial mission was completed, the plant was modified to provide for the separation of strontium and cesium, individually, from the fission productwaste stream following plutonium and uranium recovery from irradiated reactor fuels in the Plutonium-Uranium Extraction Plant (PUREX). The recovered, purified, and concentrated strontium and cesium solutions were then transferred to the WESF for conversion to solid compounds, encapsulation, and interim storage. After strontium and cesium removal, the remaining waste was transferred from B Plant to tank farms. B Plantis an operating facility that is required to ensure safe storage And management of the WESF cesium and strontium capsules, as well as a substantial radiological inventory remaining in the plant from previous campaigns. There are currently no production activities at B Plant, but several operating systems are required to accomplish the current B Plant mission.B Plant receives and stores various chemicals from commercial suppliers for treatment of low-level waste generated at WESF and B Plant, generation of demineralized water, and conditioning of water used in heating, ventilation, and air conditioning units. This report describes the maintenance of B Plant, including personnel training and schedules.

Tritt, S.E.

1992-06-01T23:59:59.000Z

149

Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker  

E-Print Network [OSTI]

is carried to understand the importance of model parameters in obtaining optimal maintenance strategies. The analysis covers the effect of inspection rate calculated for each stage and its impact on failure probability, inspection cost, maintenance cost...

Natti, Satish

2010-01-14T23:59:59.000Z

150

Section 6 -Facilities Usage and Maintenance A. Facilities Usage and Maintenance  

E-Print Network [OSTI]

Section 6 - Facilities Usage and Maintenance A. Facilities Usage and Maintenance 1 be held financially responsible. Financial responsibility extends to abandoned belongings, excessive is not permitted under any circumstances. Storage facilities are provided in most student housing units for storing

Pantaleone, Jim

151

Lessons Learned: The Grand Junction Office Site Transfer to Private Ownership  

SciTech Connect (OSTI)

The U.S. Department of Energy Grand Junction Office (DOE?GJO) in Grand Junction, Colorado, has played an integral role within the DOE complex for many years. GJO has a reputation for outstanding quality in the performance of complex environmental restoration projects, utilizing state-of-the-art technology. Many of the GJO missions have been completed in recent years. In 1998, DOE Headquarters directed GJO to reduce its mortgage costs by transferring ownership of the site and to lease space at a reasonable rate for its ongoing work. A local community group and GJO have entered into a sales contract; signing of the Quitclaim Deed is planned for February 16, 2001. Site transfer tasks were organized as a project with a critical-path schedule to track activities and a Site Transition Decision Plan was prepared that included a decision process flow chart, key tasks, and responsibilities. Specifically, GJO identified the end state with affected parties early on, successfully dealt with site contamination issues, and negotiated a lease-back arrangement, resulting in an estimated savings of more than 60 percent of facility maintenance costs annually. Lessons learned regarding these transition activities could be beneficial to many other sites.

none,

2001-02-01T23:59:59.000Z

152

Vehicle Maintenance Procedure Outline the procedure for vehicle maintenance at University of Michigan (U-M).  

E-Print Network [OSTI]

Vehicle Maintenance Procedure Objective Outline the procedure for vehicle maintenance at University of Michigan (U-M). Procedure 1. Your U-M vehicle has a mechanical and/or safety issue. 2. Contact Garage of the vehicle or if needed, have the vehicle towed to the maintenance facility. 4. If a loaner is needed while

Kirschner, Denise

153

FFTF and Advanced Reactors Transition Program Resource Loaded Schedule  

SciTech Connect (OSTI)

This Resource Load Schedule (RLS) addresses two missions. The Advanced Reactors Transition (ART) mission, funded by DOE-EM, is to transition assigned, surplus facilities to a safe and compliant, low-cost, stable, deactivated condition (requiring minimal surveillance and maintenance) pending eventual reuse or D&D. Facilities to be transitioned include the 309 Building Plutonium Recycle Test Reactor (PRTR) and Nuclear Energy Legacy facilities. This mission is funded through the Environmental Management (EM) Project Baseline Summary (PBS) RL-TP11, ''Advanced Reactors Transition.'' The second mission, the Fast Flux Test Facility (FFTF) Project, is funded through budget requests submitted to the Office of Nuclear Energy, Science and Technology (DOE-NE). The FFTF Project mission is maintaining the FFTF, the Fuels and Materials Examination Facility (FMEF), and affiliated 400 Area buildings in a safe and compliant standby condition. This mission is to preserve the condition of the plant hardware, software, and personnel in a manner not to preclude a plant restart. This revision of the Resource Loaded Schedule (RLS) is based upon the technical scope in the latest revision of the following project and management plans: Fast Flux Test Facility Standby Plan (Reference 1); Hanford Site Sodium Management Plan (Reference 2); and 309 Building Transition Plan (Reference 4). The technical scope, cost, and schedule baseline is also in agreement with the concurrent revision to the ART Fiscal Year (FY) 2001 Multi-Year Work Plan (MYWP), which is available in an electronic version (only) on the Hanford Local Area Network, within the ''Hanford Data Integrator (HANDI)'' application.

GANTT, D.A.

2000-10-31T23:59:59.000Z

154

Void Fraction Instrument operation and maintenance manual  

SciTech Connect (OSTI)

This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

1994-09-01T23:59:59.000Z

155

Software Testing and Maintenance 1 Regression Testing  

E-Print Network [OSTI]

1 Software Testing and Maintenance 1 Regression Testing Introduction Test Selection Test Minimization Test Prioritization Summary Software Testing and Maintenance 2 What is it? Regression testing refers to the portion of the test cycle in which a program is tested to ensure that changes do not affect

Lei, Jeff Yu

156

Standard hydrogen monitoring system-B operation and maintenance manual  

SciTech Connect (OSTI)

The purpose of this document is to provide information for the operation and maintenance of the Standards Hydrogen Monitoring System-B (SHMS-B) used in the 200E and 200W area tank farms on the Hanford site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. The primary function of the SHMS-B is to monitor specifically for hydrogen in the waste tank vapor space which may also contain unknown quantities of other gaseous constituents.

Bender, R.M.

1995-01-25T23:59:59.000Z

157

Functional Prognostic Architecture for the Maintenance of Complex Systems  

E-Print Network [OSTI]

their functions by new ones. In order to optimize the maintenance cost, it is necessary to perform preventive maintenance to prevent failure occur- rence. Preventive maintenance actions consist in replacing components the date of the next scheduled maintenance phase. In the classical case, preventive maintenance is only

Pencolé, Yannick

158

Diagnosis and prognosis for the maintenance of complex systems  

E-Print Network [OSTI]

--Diagnosis, prognosis, preventive maintenance, complex systems. I. INTRODUCTION Nowadays, system maintenance is a key to decrease the maintenance cost, it is necessary to perform preventive maintenance [3], [4], [5] which alsoDiagnosis and prognosis for the maintenance of complex systems Pauline Ribot1,2 , Yannick Pencol¬īe1

Pencolé, Yannick

159

Transition projects FY 1995 multi-year program/fiscal year work plan WBS 1.3.1. and 7.1  

SciTech Connect (OSTI)

The primary Transition Projects mission is to deactivate facilities on the Hanford site, in preparation for decontamination and decommissioning, and secondarily to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Transition projects will protect the health and safety of the public and of workers, protect the environment, and provide beneficial use of the facilities and other resources. Goals include the following: Achieve deactivation of facilities for transfer to the Hanford Surplus Facility Program, suing PUREX plant deactivation as a model; Achieve excellence in the conduct of operations and maintenance of nuclear facilities in support of the Hanford Site Mission; manage nuclear materials in a safe and secure condition; treat nuclear materials as necessary and store onsite in long-term interim safe storage awaiting a final disposition decision. Description of the program and projects is included.

Not Available

1994-09-01T23:59:59.000Z

160

Development of Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResources DOE ZeroThree Biorefineries to ProduceNuclearDerrickDepartment

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Optimization models for improving periodic maintenance schedules by utilizing opportunities  

E-Print Network [OSTI]

to this as preventive maintenance activities at an oppor- tunity. The original opportunistic replacement problemOptimization models for improving periodic maintenance schedules by utilizing opportunities Torgny of Technology Abstract We present mathematical models for finding optimal opportunistic maintenance schedules

Patriksson, Michael

162

Modelling maintenance for components under competing risk Helge Langseth  

E-Print Network [OSTI]

preventively maintained. The preventive maintenance (PM) is performed periodically with some period , but PMModelling maintenance for components under competing risk Helge Langseth Norwegian University the mathematical modelling of imperfect maintenance of a system under competing risk. The model we propose

Langseth, Helge

163

Condition-Based Maintenance via Simulation and a Targeted Bayesian  

E-Print Network [OSTI]

malfunctioning. Accordingly, it is essential to undertake an effective preventive maintenance (PM) policyCondition-Based Maintenance via Simulation and a Targeted Bayesian Network Metamodel Aviv Gruber, Israel ABSTRACT Condition-based maintenance (CBM) is increasingly applied to operational systems

Ben-Gal, Irad E.

164

Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO)  

E-Print Network [OSTI]

, Limited Commercial Landscape Maintenance, Ornamental & Turf, Private Ag, or General Standards CORE for Limited Commercial Landscape Maintenance (LCLM), you must attend all day to earn the 6 CEUs required. Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO) Training & Exams Date

Florida, University of

165

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

2001-06-01T23:59:59.000Z

166

Site Transition Framework | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the Americas |DOE FormerEnergy Data Access|DepartmentFramework

167

Site Transition Guidance | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the Americas |DOE FormerEnergy Data

168

Competitive Dynamics of Web Sites  

E-Print Network [OSTI]

We present a dynamical model of web site growth in order to explore the effects of competition among web sites and to determine how they affect the nature of markets. We show that under general conditions, as the competition between sites increases, the model exhibits a sudden transition from a regime in which many sites thrive simultaneously, to a "winner take all market" in which a few sites grab almost all the users, while most other sites go nearly extinct. This prediction is in agreement with recent measurements on the nature of electronic markets.

Sebastian M. Maurer; Bernardo A. Huberman

2000-03-17T23:59:59.000Z

169

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of...

170

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR...

171

FY 2014 Real Property Data Related to Operations and Maintenance...  

Office of Environmental Management (EM)

FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY2014DataRelatedtoOperatio...

172

Project Profile: Innovative Application of Maintenance-Free Phase...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Systems Project Profile: Innovative Application of Maintenance-Free Phase-Change Thermal...

173

A case model for predictive maintenance  

E-Print Network [OSTI]

This project is to respond to a need by Varian Semiconductor Equipment Associates, Inc. (VSEA) to help predict failure of ion implanters. Predictive maintenance would help to reduce the unscheduled downtime of ion implanters, ...

Li, Jiawei, M. Eng. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

174

Maintenance expo................... 3 Georgia visitors....................... 3  

E-Print Network [OSTI]

Inside ∑ Maintenance expo................... 3 ∑ Georgia visitors....................... 3 ∑ Fluid Power Center ................ 4 ∑ CTS services Web page .......... 4 A monthly report on transportation transformation of nation's transportation policy The results of a 13-month study led by David Kittelson

Minnesota, University of

175

Risk impact of maintenance program changes  

E-Print Network [OSTI]

This study quantifies the change in one measure of plant risk, the frequency of loss of long-term decay heat removal, due to changes in maintenance at the James A. Fitzpatrick (JAF) plant. Quantification is accomplished ...

Credit, Kimberly A. (Kimberly April)

1992-01-01T23:59:59.000Z

176

Operations and Maintenance for Major Equipment Types  

Broader source: Energy.gov [DOE]

Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

177

Optimizing Installation, Operation, and Maintenance at Offshore...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

wind industries, and significant first-hand knowledge of offshore installation, operation and maintenance (IO&M) activities. The aim of the GL GH study was to enable project...

178

Significantly reduce maintenance time Documents&Mediabecomesthekey  

E-Print Network [OSTI]

Significantly reduce maintenance time ∑ Documents&Mediabecomesthekey contactforallmaintenanceneeds. ∑ MajorpartsarestoredbyDocuments& MediaattheMissionCenter.Thisreduces thetimeneededtoorderpartsandresultsin&Mediaoffersthecampus communityaconvenientandeconomicsolution foritscopiers,multifunctiondevicesandprinter needs. Print Management Program advantages Reduce

Mullins, Dyche

179

Pressure maintenance in a volatile oil reservoir  

E-Print Network [OSTI]

PRESSURE MAINTENANCE IN A VOLATILE OIL RESERVOIR A Thesis BRUCE ALAN SCHUSTER Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May, 1989 Major... Subject: Petroleum Engineering PRESSURE MAINTENANCE IN A VOLATILE OIL RESERVOIR A Thesis BRUCE ALAN SCHUSTER Approved as to style and content by: S. A. Holditch (Chair of Committee) W. J. Lee (Member) R. R, Berg (Member) , Jz W. D. Von Gonten...

Schuster, Bruce Alan

1989-01-01T23:59:59.000Z

180

Thermography for Preventive Maintenance and Conservation  

E-Print Network [OSTI]

THERMOGRAPHY FOR PREVENTIVE MAINTENANCE AND CONSERVATION Tony Lopez Southern California Gas Company Los Angles, California The Supply Situation With fuel prices soaring, more and more companies are looking at energy management as a means... years. In the last twenty years, however, other applica tions have been developed for thermography. Some of these include: medicine, nondestructive testi:ng, aerial land mapping, preventive maintenance and conservation. The balance of this paper...

Lopez, T.

1979-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Optimal Preventive Maintenance Under Decision Dependent Uncertainty  

SciTech Connect (OSTI)

We analyze a system of N components with dependent failure times. The goal is to obtain the optimal block replacement interval (different for each component) over a finite horizon that minimizes the expected total maintenance cost. In addition, we allow each preventive maintenance action to change the future joint failure time distribution. We illustrate our methodology with an example from South Texas Project Nuclear Operating Company. (authors)

Galenko, Alexander; Popova, Elmira [University of Texas at Austin, 1 University Station, Austin, Texas 78712 (United States); Kee, Ernie; Grantom, Rick [South Texas Project Nuclear Operating Company - STPNOC, P.O. Box 289, Wadsworth, Tx 77483 (United States)

2006-07-01T23:59:59.000Z

182

Soils Management, Site Productivity and Forest Nutrition: Nutrient Balance  

E-Print Network [OSTI]

;#12;1) principals 2) strategies 3) implementation Sustainable Soil Management: #12;- maintenance of fertility soil management Strategies: #12;Examples of adaptive management models used for achieving sustainableSoils Management, Site Productivity and Forest Nutrition: Nutrient Balance and Availability

183

On-Site Wastewater Treatment Systems: Spray Distribution (Spanish)  

E-Print Network [OSTI]

Spray distribution systems for wastewater treated on site are much like lawn irrigation systems. This publication explains the advantages, disadvantages, maintenance steps and estimated costs of spray distribution systems....

Lesikar, Bruce J.; Enciso, Juan

1999-08-12T23:59:59.000Z

184

Site Feeds - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearchScheduled System OutagesNewsMaterialsX-rayOur‚ÄĻSimulation,Site

185

Site Screening, Site Selection,  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBi (2)Sharing Smartversatileplatform chemical.OfficeScreening, Site

186

Towards a maintenance and servicing indicator Pascal Vrignat 1  

E-Print Network [OSTI]

: Preventive Maintenance, Maintenance planning, Hidden Markov Model, Failure detection. 1 Introduction, events may be prevented by applying a correct maintenance policy. Some tankers may not have sunk if some maintenance had been correctly applied. Factory should not have exploded with some preventive control

Boyer, Edmond

187

Kernel spectral clustering for predicting maintenance of industrial machines  

E-Print Network [OSTI]

to deal with sensory faults have been used [1],[2],[3]: corrective maintenance, preventive maintenance the machine fails, it is expensive and safety and environment issues arise. Preventive maintenance is basedKernel spectral clustering for predicting maintenance of industrial machines Rocco Langone1, Carlos

188

Grouping maintenance strategy with availability constraint under limited  

E-Print Network [OSTI]

with significant assumptions: maintenance durations are neglected and only one preventive maintenance for eachGrouping maintenance strategy with availability constraint under limited repairmen Phuc Do Van Hai maintenance strategies of multi-component systems by integrating two efficient optimization algorithms

Paris-Sud XI, Université de

189

Performance evaluation of centralized maintenance workshop by using Queuing Networks  

E-Print Network [OSTI]

maintenance types: Preventive maintenance: different actions are programmed in cycle periods; CorrectivePerformance evaluation of centralized maintenance workshop by using Queuing Networks Zineb Simeu: Maintenance workshop integrated in the job-shop system is required in order to maintain the production

Paris-Sud XI, Université de

190

Maintenance and long life of manjemen & pengelolaan dan  

E-Print Network [OSTI]

: SACA&D Maintenance ­ p.6 #12;ensure operability What does this mean? · preventive maintenanceMaintenance and long life of SACA&D manjemen & pengelolaan dan umur panjang Gerard van der Schrier KNMI BMKG: SACA&D Maintenance ­ p.1 #12;Why SACA&D extreme weather and food security Jakarta Post, 10

Stoffelen, Ad

191

Comparison of Selected Model Evaluation Criteria for Maintenance Applications  

E-Print Network [OSTI]

, Louisville, KY 40292, USA Model-based preventive maintenance relies on creating models that can either loss, and as a whole a sluggish system, the focus has shifted to preventive maintenance. Computerized maintenance systems aid in improving the efficiency of maintenance tasks [28]. The approach of preventive

Huang, Samuel H.

192

Optimal Maintenance Scheduling of a Gas Engine Power Plant  

E-Print Network [OSTI]

to carry out preventive maintenance at regular intervals19 . The maintenance schedule affects many short1 Optimal Maintenance Scheduling of a Gas Engine Power Plant using Generalized Disjunctive with parallel units. Gas engines are shutdown according to a regular maintenance plan that limits the number

Grossmann, Ignacio E.

193

Examining changes in transit passenger travel behavior through a Smart Card activity analysis  

E-Print Network [OSTI]

Transit passenger behavior is an area of major interest for public transportation agencies. The relationship between ridership and maintenance projects, however, is unexplored but increasingly relevant in the era of aging ...

Mojica, Carlos H

2008-01-01T23:59:59.000Z

194

Annual report on surveillance and maintenance activities at Oak Ridge National Laboratory, Oak Ridge, Tennessee, fiscal year 1996  

SciTech Connect (OSTI)

In fiscal year (FY) 1995, the sites and facilities from both the Remedial Action (RA) and Decontamination and Decommissioning (D and D) programs were combined to form the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program. Surveillance and Maintenance activities were conducted throughout FY 1996 at the RA facilities. Overall, the RA S and M Program consists of approximately 650 acres that include 14 waste area groupings with approximately 200 sites. These sites include 46 major facilities, several leak and contaminated soil sites, 38 inactive tanks, approximately 50 environmental study areas and approximately 2,973 wells and boreholes. Site inspections were conducted at established frequencies on appropriate sites in the RA S and M Program in accordance with the established S and M FY 1996 Incentive Task Order (ITO).

NONE

1996-11-01T23:59:59.000Z

195

maintenance. This research is relevant to opera-tions and maintenance challenges facing aging  

E-Print Network [OSTI]

the need for preventive maintenance or other diagnostic activities on the physical system. Simulationsmaintenance. This research is relevant to opera- tions and maintenance challenges facing aging-benefit of extending the time between overhauls. reducing the probability of a failure in the field. and preventive

196

Apply reliability centered maintenance to sealless pumps  

SciTech Connect (OSTI)

This paper reports on reliability centered maintenance (RCM) which is considered a crucial part of future reliability engineering. RCM determines the maintenance requirements of plants and equipment in their operating context. The RCM method has been applied to the management of critical sealless pumps in fire/toxic risk services, typical of the petrochemical industry. The method provides advantages from a detailed study of any critical engineering system. RCM is a team exercise and fosters team spirit in the plant environment. The maintenance strategy that evolves is based on team decisions and relies on maximizing the inherent reliability built into the equipment. RCM recommends design upgrades where this inherent reliability is being questioned. Sealless pumps of canned motor design are used as main reactor charge pumps in PVC plants. These pumps handle fresh vinyl chloride monomer (VCM), which is both carcinogenic and flammable.

Pradhan, S. (Exxon Chemicals Canada, Ontario (Canada))

1993-01-01T23:59:59.000Z

197

A Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL-MORELLO*, Noureddine ZERHOUNI*  

E-Print Network [OSTI]

- ing to different strategies (preventive maintenance, predictive maintenance, correc- tive maintenanceA Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL of information and communication technol- ogies has resulted in a variety of maintenance support systems

Paris-Sud XI, Université de

198

Maintenance strategies to improve sootblower availability  

SciTech Connect (OSTI)

Sootblowers are electromechanical devices used for removal of ash and slag deposits from boiler tube surfaces. By directing steam, air, or water cleaning medium through a nozzle to remove deposits from boiler tubes, boilers are kept on-line for longer periods of time reducing the need for outages to clean the boiler by mechanical means. Fuel must be burned efficiently to minimize stagging and fouling of the heat transfer surfaces. Tuning the boiler to maximize combustion efficiency should not be limited to optimizing fuel conditions, air-fuel ratios, firing rates, excess air, and over-fire air, but should also include the use of sootblowers. The goal is to know when to clean, and if the cleaning cycle has effectively removed the deposit and increased heat transfer. Today, boiler cleaning technology not only focuses on the impact of the sootblowing system on overall boiler performance, but it also focuses on design improvements that impact an individual sootblower`s performance. Proper sootblower maintenance is an integral part of making existing designs and new designs work. Existing computer technologies provide a viable means of documenting and trending sootblower performance data and maintenance history. The personal computer and the availability of spreadsheet and database software make the task of quantifying sootblower performance data and maintenance history easier to achieve. The difficult task is gathering the proper data to make decisions about sootblowing operations and maintenance. The balance of this paper will discuss typical maintenance practices, and improvements that can be achieved by documenting sootblowing system inspections and maintenance activity using a personal computer database.

Walther, J.M.; Whitehead, B.K.

1996-07-01T23:59:59.000Z

199

Site Cleanup Report for Sites PBF-33 and PBF-34  

SciTech Connect (OSTI)

This document summaries the actions taken to remove asbestos-reinforced-concrete (transite) pipe and miscellaneous debris from Power Purst Facility (PBF)-33 and PBF-34 sites. Removal of pipe and debris were performed in November 2006 in accordance with the requirements discussed in notice of soil disturbance NSD-PBF-07-01. Debris at these two sites were classified as industrial waste that could be disposed at the Central Facilities Area (CFA) landfill at the Idaho National Laboratory. Asbestos removal was performed as Class IV asbestos cleanup work. All transite pipe was double bagged and dispositioned in the INL Landfill Complex at CFA. The remaining miscellaneous debris was loaded into dump trucks and taken to the INL Landfill Complex at CFA for final disposition. Cleanup actions are complete for both sites, and no debris or hazardous constituents remain. Therefore, both sites will be classified as No action sites.

W. L. Jolley

2007-01-16T23:59:59.000Z

200

Steam Trap Maintenance as a Profit Center  

E-Print Network [OSTI]

the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 EXCUSES Everybody thinks his or her steam trap maintenance is good. Surveysl have shown the following are the most popular excuses encountered when managers are confronted... for steam traps. 192 ESL-IE-96-04-28 Proceedings from the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 5. Set up a trap maintenance program C. Prepare and present a report to that will: management on the results...

Bouchillon, J. L.

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Site Management Guide (Blue Book)  

SciTech Connect (OSTI)

The U.S. Department of Energy (Department) Office of Legacy Management (LM), established in 2003, manages the Departmentís postclosure responsibilities and ensures the future protection of human health and the environment. During World War II and the Cold War, the Federal government developed and operated a vast network of industrial facilities for the research, production, and testing of nuclear weapons, as well as other scientific and engineering research. These processes left a legacy of radioactive and chemical waste, environmental contamination, and hazardous facilities and materials at well over 100 sites. Since 1989, the Department has taken an aggressive accelerated cleanup approach to reduce risks and cut costs. At most Departmental sites undergoing cleanup, some residual hazards will remain at the time cleanup is completed due to financial and technical impracticality. However, the Department still has an obligation to protect human health and the environment after cleanup is completed. LM fulfills DOEís postclosure obligation by providing long-term management of postcleanup sites which do not have continuing missions. LM is also responsible for sites under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Currently, the U.S. Army Corps of Engineers (USACE) is responsible for site surveys and remediation at FUSRAP sites. Once remediation is completed, LM becomes responsible for long-term management. LM also has responsibility for uranium processing sites addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). UMTRCA Title II sites are sites that were commercially owned and are regulated under a U.S. Nuclear Regulatory Commission (NRC) license. For license termination, the owner must conduct an NRC-approved cleanup of any on-site radioactive waste remaining from former uranium ore-processing operations. The site owner must also provide full funding for inspections and, if necessary, ongoing maintenance. Once site cleanup is complete, LM accepts title to these sites on behalf of the United States and assumes long-term management.

None

2014-03-01T23:59:59.000Z

202

ICD Complex Operations and Maintenance Plan  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

Gibson, P. L.

2007-06-25T23:59:59.000Z

203

Facilities Cost Pool: Maintenance Service Responsibilities  

E-Print Network [OSTI]

C 16 EXTERIOR LANDSCAPING University Standard FM FM C 17 EXTERIOR STD BUILDING SIGNS FM FM FM FM FMD 22 DATA POINT MONITORING Environmental building standard FM FM C Cost Pool: Maintenance Service Responsibilities 2 Table of Contents 3 Building Shell

Gulliver, Robert

204

Wind Energy Facility Reliability and Maintenance  

E-Print Network [OSTI]

Wind Energy Facility Reliability and Maintenance Eunshin Byon, Lewis Ntaimo, Chanan Singh and Yu related to wind energy facility reliability and mainte- nance focused more on qualitative aspects. In this chapter, we provide a comprehensive account of the existing research regarding wind energy facility

Ding, Yu

205

Reliable Link Maintenance in Cognitive Radio Systems  

E-Print Network [OSTI]

resources and overcome the under-utilization of licensed spectrum. Since the licensed user still keeps) have to vacate the spectrum in case the licensed user claims it. In order to maintain the qualityReliable Link Maintenance in Cognitive Radio Systems Daniel Willkomm, James Gross and Adam Wolisz

Gross, James

206

Title I Disposal Sites Annual Report  

Broader source: Energy.gov [DOE]

This report presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements.

207

TRACKING SITE  

Energy Science and Technology Software Center (OSTI)

003235MLTPL00 AASG Geothermal Data submissions tracking application and site.† https://github.com/usgin/aasgtrack†

208

Development of Site Transition Plan, Use of the Site Transition Framework,  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005Department ofDOE AccidentWasteZoneEnergyDetecting AirTrough

209

Energy Conservation Thru Steam Trap Surveys and Preventive Maintenance Programs  

E-Print Network [OSTI]

ENERGY CONSERVATION THRU STEAM TRAP SURVEYS AND PREVENTIVE MAINTENANCE PROGRAMS Terry Boynton, Armstrong, Three Rivers, Mich. Bob Dewhirst, Armstrong, New Braunfels, Texas. This paper will deal with steam trap surveys and preventive maintenance...

Boynton, T.; Dewhirst, B.

1980-01-01T23:59:59.000Z

210

WINCO maintenance before and after DOE 4330.4A  

SciTech Connect (OSTI)

This report discusses numerous elements of the maintenance program at the Idaho Chemical Processing Plant (ICPP) which have undergone changes during the last 5 years. Looking back, many of the maintenance program changes prior to 1991 were fragmented. Maintenance program elements were being ratcheted to address specific productivity and safety concerns. The improvements were warranted, but often improvements were implemented without a systematic review of how they impacted other maintenance program elements. After 1990 when WINCO began using the Chapter II guidelines of DOE Order 4330.4A as a maintenance program model, there was a marked improvement in the quality of the maintenance program changes. The post 1990 changes have been part of a systematic plan that has been communicated to all of the maintenance players. The Chapter II guidelines and the maintenance implementation plan (MIP) personnel with a focus for improvement that was missing prior to 1991.

Remsburg, R.E.

1993-04-27T23:59:59.000Z

211

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov [DOE]

Guide covers version 3.0 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

212

E-Print Network 3.0 - analyzing maintenance strategies Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OR I GI NAL AR T I C LE Summary: OSA-CBM Preventive maintenance Reliability-centered maintenance 1 Maintenance strategies... and motivations for health monitoring The...

213

Modelling of dependence between critical failure and preventive maintenance  

E-Print Network [OSTI]

Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect that the failure can be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

Langseth, Helge

214

A MAINTENANCE MODEL FOR COMPONENTS EXPOSED TO SEVERAL FAILURE MECHANISMS  

E-Print Network [OSTI]

. The preventive maintenance (PM) is performed periodically with some fixed period , but PM can also be performed describe the "goodness" of the maintenance crew; their ability to prevent failures by performing thorough is assumed to undergo preventive maintenance (PM), usually at fixed time periods > 0. In addition

Langseth, Helge

215

Maintenance policy: degradation laws versus Hidden Markov Model availability indicator  

E-Print Network [OSTI]

INTRODUCTION Industrial processes need to be maintained to prevent breakdown. Some years ago, maintenance, logistic... Different kinds of maintenance policy can be applied: preventive or corrective according to manager strategies. In case of preventive maintenance, different strategies should be used like planned

Paris-Sud XI, Université de

216

Modelling of dependence between critical failure and preventive maintenance  

E-Print Network [OSTI]

Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

Langseth, Helge

217

`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES  

E-Print Network [OSTI]

part (McCall, 1963). Then an opportunistic maintenance is any action that combines a preventive`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES E. Levrat, E Vandoeuvre (France) Abstract: Today, a new role for maintenance exists to enhance the eco

Boyer, Edmond

218

Commencement Activities & Facility Maintenance Closures Updated Monday 4/29  

E-Print Network [OSTI]

· Fitness Center & Weight Room equipment cleaning, preventive maintenance, and layout changes #12;Commencement Activities & Facility Maintenance Closures Updated Monday 4/29 Spring Semester Normal Maintenance projects. · The Rec Center will be closed Monday 5/20 ­ Sunday 6/9. · The Rec Center reopens

von der Heydt, R√ľdiger

219

Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies  

E-Print Network [OSTI]

Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies ABSTRACT Heavy of minimizing the makespan for a set of preventive maintenance (PM) tasks, requiring single- or multiple approach to the SA approach for this class of PM problems. Subject Area: Preventive Maintenance, Evolution

Terwilliger, Mark

220

Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1  

E-Print Network [OSTI]

when the need is discovered, but a good preventive maintenance program will reduce the number. This fact sheet will emphasize corrective and preventive maintenance procedures for ventilation, evaporativeAE26 Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1 D. E

Watson, Craig A.

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Probabilistic service life prediction and maintenance planning of deteriorating structures  

E-Print Network [OSTI]

life prediction of a bridge pier and to the selection of a suitable preventive maintenance scenario. 1 with an aggressive environment, and to eventually plan a process of essential and/or preventive maintenance, some preventive maintenance scenario. 2 RELIABILITY OF DETERIORATING STRUCTURAL SYSTEMS The deterioration

Garavaglia, Elsa

222

Optimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective  

E-Print Network [OSTI]

. Numerical examples have shown that our model provides a preventive maintenance policy that slows downOptimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective Mariem Zouch, Thomas Yeung / IRCCyN, F-44307 NANTES Cedex, France Keywords: Road deterioration, maintenance optimization, Partially

Boyer, Edmond

223

Optimal Maintenance Scheduling of a Power Plant with Seasonal  

E-Print Network [OSTI]

-Wide Optimization Meeting · Plan preventive maintenance shutdowns ­ Minimize payment for skilled labor ­ Save onlineOptimal Maintenance Scheduling of a Power Plant with Seasonal Electricity Tariffs Pedro M. Castro maintenance team doing shutdowns · Shutdown period mandatory after [ , ] h online · Challenging (hard

Grossmann, Ignacio E.

224

IEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind  

E-Print Network [OSTI]

from sensors, our research objective is to derive an optimal observation and preventive maintenance TRANSACTIONS ON RELIABILITY 3 ACRONYMS NA no action PM preventive maintenance OB observation CM correctiveIEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind Turbine Systems Under

Ntaimo, Lewis

225

Single-machine Multiple-recipe Predictive Maintenance , John Hasenbein  

E-Print Network [OSTI]

preventative and corrective maintenance costs, holdings costs, and possibly production costs. An optimal policy. In a conventional preventive maintenance policy, it is typically assumed that the decision maker knows only when, conventional preventive maintenance policies are often one of two types: calendar-based or job

Hasenbein, John

226

Experiment #1 Maintenance of UV/vis Instruments  

E-Print Network [OSTI]

considerably worse than it should be. For these reasons, most companies have a preventive maintenance program that might be included in a preventive maintenance program for a UV-visible spectrometer. Your taskExperiment #1 Maintenance of UV/vis Instruments Objectives: 1. Learn how to use different UV

Nazarenko, Alexander

227

Analysis of Preventive Maintenance in Transactions Based Software Systems  

E-Print Network [OSTI]

Analysis of Preventive Maintenance in Transactions Based Software Systems Sachin Garg 1 , Antonio''. However, it incurs some overhead. The necessity to do preventive maintenance not only in general purpose to illustrate the usefulness and applicability of the models. Keywords: Preventive Maintenance, Transactions

Telek, Miklós

228

Maintenance Approaches For ARIES-CS Power Core  

E-Print Network [OSTI]

of Fusion Energy September 14-16, 2004 Madison, WI #12;2 Outline Introduction Reactor parameters Maintenance approach based on field-period units Modular maintenance approach through selected ports Maintenance approach with ports between all the modular coils Summary and conclusion #12;3 Introduction The engineering

229

Software Maintenance and Evolution: Keith Bennett & Vaclav Rajlich  

E-Print Network [OSTI]

for change and improvements. Our aim is to describe a landscape for research in software maintenanceSoftware Maintenance and Evolution: A Roadmap Keith Bennett & Vaclav Rajlich Key Research Pointers transformation techniques. He is a founding co-Director of the Centre for Software Maintenance at Durham

230

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

2007-02-13T23:59:59.000Z

231

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

2010-04-21T23:59:59.000Z

232

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Cancels DOE O 433.1A. Admin Chg 1, dated 3-12-2013, cancels DOE O 433.1B.

2010-04-21T23:59:59.000Z

233

INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY 2005  

SciTech Connect (OSTI)

This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during fiscal year 2005. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document. Waste Area Groups 7 and 8 are not reported in this document. Waste Area Group 7 is an operating facility, and the status of its operations is reported directly to the regulatory agencies. Waste Area Group 8 is excluded from this report, because it falls outside the direct control of U.S. Department of Energy Idaho Operations Office. The INEEL Sitewide Institutional Controls Plan discusses the inspection, maintenance, repair, and reporting activities involving institutional controls at the Idaho National Laboratory Site. Therefore, the maintenance of institutional controls is not discussed in this report. The Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan provides a reference to support this report by providing current and projected facility and land uses and by listing the Comprehensive Environmental Response, Compensation, and Liability Act sites.

D. R. Fitch

2005-09-22T23:59:59.000Z

234

Alameda-Contra Costa Transit District (AC Transit) Fuel Cell...  

Energy Savers [EERE]

(AC Transit) Fuel Cell Transit Buses: Preliminary Evaluation Results Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Preliminary Evaluation Results This...

235

LONG-TERM STEWARDSHIP AT DOE HANFORD SITE - 12575  

SciTech Connect (OSTI)

The U.S. Department of Energy's (DOE) Hanford Site is located in southeast Washington and consists of 1,518 square kilometers (586 square miles) of land. Established in 1943 as part of the Manhattan Project, Hanford workers produced plutonium for our nation's nuclear defense program until the mid 1980's. Since then, the site has been in cleanup mode that is being accomplished in phases. As we achieve remedial objectives and complete active cleanup, DOE will manage Hanford land under the Long-Term Stewardship (LTS) Program until completion of cleanup and the site becomes ready for transfer to the post cleanup landlord - currently planned for DOE's Office of Legacy Management (LM). We define Hanford's LTS Program in the ''Hanford Long-Term Stewardship Program Plan,'' (DOE/RL-201 0-35)[1], which describes the scope including the relationship between the cleanup projects and the LTS Program. DOE designed the LTS Program to manage and provide surveillance and maintenance (S&M) of institutional controls and associated monitoring of closed waste sites to ensure the protection of human health and the environment. DOE's Richland Operations Office (DOE-RL) and Hanford cleanup and operations contractors collaboratively developed this program over several years. The program's scope also includes 15 key activities that are identified in the DOE Program Plan (DOE/RL-2010-35). The LTS Program will transition 14 land segments through 2016. The combined land mass is approximately 570 square kilometers (220 square miles), with over 1,300 active and inactive waste sites and 3,363 wells. Land segments vary from buffer zone property with no known contamination to cocooned reactor buildings, demolished support facilities, and remediated cribs and trenches. DOE-RL will transition land management responsibilities from cleanup contractors to the Mission Support Contract (MSC), who will then administer the LTS Program for DOE-RL. This process requires an environment of cooperation between the contractors and DOE-RL. Information Management (IM) is a key part of the LTS program. The IM Program identifies, locates, stores, protects and makes accessible Hanford LTS records and data to support the transfer of property ultimately to LM. As such, DOE-RL manages the Hanford LTS Program in a manner consistent with LM's goals, policies, and procedures.

MOREN RJ; GRINDSTAFF KD

2012-01-11T23:59:59.000Z

236

INL SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS  

SciTech Connect (OSTI)

On November 9, 2002, the U.S. Environmental Protection Agency, the U.S. Department of Energy, and the Idaho Department of Environmental Quality approved the 'Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites', which required a Site-wide institutional controls plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. This revision identifies and consolidates the institutional controls and operations and maintenance requirements into a single document.

JOLLEY, WENDELL L

2008-02-05T23:59:59.000Z

237

Review of maintenance personnel practices at nuclear power plants  

SciTech Connect (OSTI)

As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations.

Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

1984-05-01T23:59:59.000Z

238

Waste Sampling and Characterization Facility (WSCF). Maintenance Implementation Plan  

SciTech Connect (OSTI)

This Maintenance Implementation Plan has been developed for maintenance functions associated with the Waste Sampling and Characterization Facility (WSCF). This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4A guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at WSCF.

Bozich, J.L.

1993-07-01T23:59:59.000Z

239

Online Monitoring to Enable Improved Diagnostics, Prognostics and Maintenance  

SciTech Connect (OSTI)

For both existing and new plant designs there are increasing opportunities and needs for the application of advanced online surveillance, diagnostic and prognostic techniques. These methods can continuously monitor and assess the health of nuclear power plant systems and components. The added effectiveness of such programs has the potential to enable holistic plant management, and minimize exposure to future and unknown risks. The 'NDE & On-line Monitoring' activities within the Advanced Instrumentation, Information and Control Systems (II&CS) Pathway are developing R&D to establish advanced condition monitoring and prognostics technologies to understand and predict future phenomena, derived from plant aging in systems, structures, and components (SSC). This research includes utilization of the enhanced functionality and system condition awareness that becomes available through the application of digital technologies at existing nuclear power plants for online monitoring and prognostics. The current state-of-the-art for on-line monitoring applied to active components (eg pumps, valves, motors) and passive structure (eg core internals, primary piping, pressure vessel, concrete, cables, buried pipes) is being reviewed. This includes looking at the current deployment of systems that monitor reactor noise, acoustic signals and vibration in various forms, leak monitoring, and now increasingly condition-based maintenance (CBM) for active components. The NDE and on-line monitoring projects are designed to look beyond locally monitored CBM. Current trends include centralized plant monitoring of SSC, potential fleet-based CBM and technology that will enable operation and maintenance to be performed with limited on-site staff. Attention is also moving to systems that use online monitoring to permit longer term operation (LTO), including a prognostic or predictive element that estimates a remaining useful life (RUL). Many, if not all, active components (pumps, valves, motors etc.) can be well managed, routinely diagnosed, analyzed and upgraded as needed using a combination of periodic and online CBM. The ability to successfully manage passive systems and structures is seen as the key to LTO, particularly in the USA. New approaches will be demonstrated, including prognostics for passive structures, which is critical to maintaining safety and availability and to reducing operations and maintenance costs for NPP's. To provide proactive on-line monitoring that includes estimates for RUL new projects will include advanced sensors, better understanding of stressors and challenges faced in quantification of uncertainty associated with RUL. This program area will leverage insights from past experience in other industries and seek to demonstrate the feasibility of on-line monitoring and prognostics to support NPP LTO.

Bond, Leonard J.

2011-02-01T23:59:59.000Z

240

Scheduling Flexible Maintenance Activities subject to Job ...  

E-Print Network [OSTI]

Apr 3, 2010 ... We consider a transition form state i to state j if and only if itransition costs ci,j are ...... Management Science, 15(1):102Ė109, 1968.

2010-04-14T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid  

E-Print Network [OSTI]

Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid-Linear Model, Expert Opinion, Complexity Reduction, Maintenance. 1 Introduction Preventive maintenance became essential. Preventive maintenance of a system is taking into account expert knowledge, feedback

Paris-Sud XI, Université de

242

Condition-based maintenance under an imperfect repair policy for a deteriorating production system  

E-Print Network [OSTI]

is periodically monitored. Imperfect preventive maintenance activities, which restore the production system policy, both linear and non-linear imperfect preventive maintenance cost functions are investigated preventive maintenance (or preventive replacement) is usually used. After each preventive maintenance action

Boyer, Edmond

243

Maintenance decision making tool reaching a compromise between maintainability and reliability performances  

E-Print Network [OSTI]

or scheduled preventive maintenance) to condition-based or predictive maintenance strategies preventive maintenance actions, in the sense that planned production stoppages within this temporal horizonMaintenance decision making tool reaching a compromise between maintainability and reliability

Paris-Sud XI, Université de

244

Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System Equipment  

E-Print Network [OSTI]

most state of the art reliability centered maintenance (RCM) approaches, but it also accounts equipment, maintenance, reliability, risk, security, optimization 1.Introduction Maintenance of bulk1 Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System

245

SunLine Transit Agency Fuel Cell Transit Bus: Fifth Evaluation...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

operations at SunLine Transit Agency for a prototype fuel cell bus and five compressed natural gas (CNG) buses. This is the fifth evaluation report for this site, and it...

246

Steam turbine path evaluation during maintenance  

SciTech Connect (OSTI)

The deterioration of a turbine (Steam & Gas) flow path affects the efficiency of the turbine. The most critical factors which affect the efficiency of turbines are: wearing out of the trailing edges of the blades by solid particle erosion, deposits, material loss due to corrosion (also sand blast) which increases the flow area, increases in blade surface roughness, etc. Wearing out of the seals caused by shaft vibrations or rapid start-up leads to significant leakage losses. Some of these effects can be estimated with some precision during operation of the turbine, but an exact evaluation can be carried out during a maintenance applying a special fluid flow analysis program. Such a program has been developed and then adapted to achieve this goal. During maintenance the complete geometry of the steam path is measured (blades lengths, widths, angles, clearances, etc.) in the condition encountered before any corrections. Then the similar measurement is undertaken after, for example, clearance corrections, blade replacements, cleaning of the blades, etc. Using the program first of all the design data is calculated. Then the actual data is fed into the program and compared to the design data. Thus the effect of the blade surface roughness, increased seal clearances, flow area increase, solid particle damage to the trailing edge and so on for each particular stage is calculated. The effect is expressed in [kW] as a deviation from the design points. This data can be helpful during online evaluation of the turbine performance. This evaluation helps the management of the plant in undertaking the correct decision concerning the date of the next major maintenance and replacement part procurement. Many turbines in the Mexican utility have been evaluated in such a manner. Some examples are presented.

Kubiak, J.; Angel, F. del; Carnero, A.; Campos, A. [Instituto de Investigaciones Electricas, Temixo, Morelos (Mexico)] [and others

1996-07-01T23:59:59.000Z

247

Sandia National Laboratories: Operations and Maintenance Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLSMolten-Salt StorageNoLong Range Radar StationReportsMaintenance

248

EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING  

SciTech Connect (OSTI)

The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

Harris, S.; Gross, R.; Mitchell, E.

2011-01-18T23:59:59.000Z

249

A cask maintenance facility feasibility study  

SciTech Connect (OSTI)

The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1989-01-01T23:59:59.000Z

250

Company Name: Cornerstone Environmental Group, LLC Web Site: www.cornerstoneeg.com  

E-Print Network [OSTI]

companies. Our services include: Landfill Engineering & Design, Air Quality Services, Site & Civil Design Services, and Operations & Maintenance. Majors they typically recruit: Civil Engineering, Earth Sciences Waste Brief Company Overview: Cornerstone Environmental Group, LLC, is an engineering firm specializing

New Hampshire, University of

251

V-078: WordPress Bugs Permit Cross-Site Scripting and Port Scanning...  

Broader source: Energy.gov (indexed) [DOE]

WordPress Bugs Permit Cross-Site Scripting and Port Scanning Attacks PLATFORM: WordPress all versions are affected prior to 3.5.1 ABSTRACT: WordPress 3.5.1 Maintenance and Security...

252

Digitizing the Administrative Records of the U.S. Department of Energy Office of Environmental Management (Em) and Office of Legacy Management (LM) Ohio Sites  

SciTech Connect (OSTI)

As former weapons sites close and are transitioned to the U.S. Department of Energy (DOE) Office of Legacy Management (LM), continued public involvement is essential for the successful turnover of long-term surveillance and maintenance (LTS and M) activities. During the environmental remediation process, public participation was a key factor in cleanup completion. The same level of commitment to encourage active public participation is true for the LTS and M activities at the LM sites, such as the Miamisburg Closure Project and the Fernald Closure Project. Community members participate in the transition and the decision-making processes for LTS and M as they did for the selection of response actions under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup process. [1] A key part of the post-closure activities for the Ohio Sites transitioning to LM from the DOE Office of Environmental Management (EM) is the preservation of site history and stakeholder involvement in the LTS and M activities that will continue during post-closure. In meeting the regulatory requirements of providing the CERCLA Administrative Record Reading Room for public access and to ensure that appropriate records are retrievable and available for all stakeholders, a decision was made to digitize the Miamisburg Closure Project and the Fernald Closure Project Administrative Records. This decision was, in part, based on the information and lessons learned from the digitization of the Rocky Flats Environmental Technology Site (RFETS) CERCLA Administrative Records (AR). The Ohio Sites effort was expanded to include the Living History Project from the Fernald Closure Project. In most cases, the CERCLA AR maintained by EM closure sites and transitioned to LM will provide adequate baselines for identifying and capturing the information required by LM for post-closure stewardship of the sites. The AR established under Section 113(k) [2] of CERCLA serves two primary purposes. First, the record contains those documents that form the basis for selection of a response action and comply with Section 113(j) [3]; judicial review of any issue concerning the adequacy of any response action is limited to the record. Second, Section 113(k) [2] requires that the AR act as a vehicle for public participation in selecting a response action. The AR is the body of documents that 'forms the basis' for the selection of a particular response action at a site and contains historic information that has future study value by scholars, historians, regulators, and other stakeholders. (authors)

Powell, J. [U.S. Department of Energy Office of Legacy Management, Cincinnati, Ohio (United States); Williams, K.; Walpole, S. [S.M. Stoller Corporation, Miamisburg, Ohio (United States); McKinney, R. [Source One Management, Inc., Denver, Colorado (United States)

2007-07-01T23:59:59.000Z

253

Simple Maintenance Saves Costly Furnace Repair/Replacement |...  

Broader source: Energy.gov (indexed) [DOE]

furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the...

254

Article Published on LED Lumen Maintenance and Light Loss Factors...  

Broader source: Energy.gov (indexed) [DOE]

of a comprehensive lifetime rating - as well as the problematic relationship between SSL lifetime and lumen maintenance - determining an appropriate LLD factor for LED products...

255

ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE  

SciTech Connect (OSTI)

The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

Trapp, D.

2014-08-25T23:59:59.000Z

256

Joint Maintenance Status Report of Potomac Electric Power Company...  

Broader source: Energy.gov (indexed) [DOE]

pursuant to the December 20. 2006, Department of Energy ("DOE") Order No. 202-05-3. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection,...

257

Technical information report: Plasma melter operation, reliability, and maintenance analysis  

SciTech Connect (OSTI)

This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

Hendrickson, D.W. [ed.

1995-03-14T23:59:59.000Z

258

Optimal forest management for carbon sequestration and biodiversity maintenance.  

E-Print Network [OSTI]

??Managing planted forests for carbon sequestration and biodiversity maintenance has become increasingly important in times of rapid climate change and the loss of biodiversity worldwide.Ö (more)

Nghiem, Thi Hong Nhung

2011-01-01T23:59:59.000Z

259

The Savannah River Site's Groundwater Monitoring Program  

SciTech Connect (OSTI)

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the first quarter of 1990. It includes the analytical data, field data, well activity data, and the other documentation for this program and provides a record of the program's activities and rationale and an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of the analytical data and other data, maintenance of the databases containing groundwater monitoring data and related data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

Not Available

1990-10-18T23:59:59.000Z

260

The Savannah River Site's Groundwater Monitoring Program  

SciTech Connect (OSTI)

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the fourth quarter of 1990. It includes the analytical data, field data, well activity data, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of analytical and other data, maintenance of the databases containing groundwater monitoring data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

Not Available

1991-06-18T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites  

SciTech Connect (OSTI)

This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27 (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.

none,

2014-03-01T23:59:59.000Z

262

Preventative maintenance plan for emergency pumping trailers  

SciTech Connect (OSTI)

The purpose/goal of this document is to identify the maintenance requirements and resources available to properly maintain the readiness and condition of the Emergency Pumping Equipment controlled by the Tank Waste Remediation System Tank Farms Plant Engineering and Tank Stabilization Operations. This equipment is intended to pump a single-shell tank (SST) that has been identified as an assumed leaking tank. The goal is to commence pumping (submersible or jet) as soon as safely possible after identifying a SST as an assumed leaking tank. Important information pertaining to the Emergency Pumping Equipment, Over-Ground Piping installation, and procedures is found in WHC-SD-WM-AP-005, ``Single Shell Tank Leak Emergency Pumping Guide.``

Wiggins, D.D.

1994-09-01T23:59:59.000Z

263

Hanford Site surface soil radioactive contamination control plan, March 1993  

SciTech Connect (OSTI)

The Decommissioning and Resource Conservation and Recovery Act Closure Program is responsible to the US Department of Energy Richland Field Office, for the safe and cost-effective surveillance, maintenance, and decommissioning of surplus facilities and Resource Conservation and Recovery Act of 1976 closures at the Hanford Site. This program also manages the Radiation Area Remedial Action that includes the surveillance, maintenance, decontamination, and/or interim stabilization of inactive burial grounds, cribs, ponds, trenches, and unplanned release sites. This plan addresses only the Radiation Area Remedial Action activity requirements for managing and controlling the contaminated surface soil areas associated with these inactive sites until they are remediated as part of the Hanford Site environmental restoration process. All officially numbered Radiation Area Remedial Action and non-Radiation Area Remedial Action contaminated surface soil areas are listed in this document so that a complete list of the sites requiring remediation is contained in one document.

Mix, P.D.; Winship, R.A.

1993-04-01T23:59:59.000Z

264

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr FlickrGuidedCH2M HILL Secretary MonizSite Public Tours Hanford Site

265

State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0  

SciTech Connect (OSTI)

On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology.

NONE

1995-11-01T23:59:59.000Z

266

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPERTransition Transition to New Mission

267

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPERTransition Transition to New

268

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPERTransition Transition to NewHerald

269

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPERTransition Transition to

270

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPERTransition Transition toTrips Get a

271

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPERTransition Transition toTrips Get

272

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPERTransition Transition toTrips

273

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPERTransition Transition toTripsPRC U

274

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPERTransition Transition toTripsPRC

275

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPERTransition Transition

276

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPERTransition TransitionFixative U

277

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPERTransition TransitionFixative

278

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPERTransition TransitionFixativeU.S.

279

05.01 1 Budget Maintenance and Development REGENTS' POLICY  

E-Print Network [OSTI]

05.01 1 Budget Maintenance and Development REGENTS' POLICY PART V ≠ FINANCE AND BUSINESS MANAGEMENT Chapter 05.01 - Budget Development and Maintenance P05.01.010. Budget Policy. A. The budget by their respective annually adopted budgets and approved amendments, in accordance with procedure established

Pantaleone, Jim

280

Modeling Web Maintenance Centers Through Queue Models M. Di Penta  

E-Print Network [OSTI]

Modeling Web Maintenance Centers Through Queue Models M. Di Penta , G. Casazza ¬° , G. Antoniol¬īeal Abstract The Internet and WEB pervasiveness are changing the landscape of several different areas ranging from infor- mation gathering/managing and commerce to software development, maintenance and evolution

Di Penta, Massimiliano

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1  

E-Print Network [OSTI]

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1 Office of Postdoctoral Maintenance Screen. All starting points begin before the popup menu comes up. In Internet Explorer the Orientation to Landscape, and click OK. Print as needed to either your printer or to Adobe PDF (only works

Kay, Mark A.

282

Long-term surveillance and maintenance Geo-spatial Environmental Mapping System  

SciTech Connect (OSTI)

For sites currently under the U.S. Department of Energy (DOE) Office of Legacy Management (LM) and for sites transitioning to LM, technical, operational, and environmental monitoring information continues to be of great interest to stakeholders. The Web-based Geo-spatial Environmental Mapping System (GEMS) developed by LM provides stakeholders, DOE, regulators, project staff, and the public with a user-friendly mechanism for retrieving geo-spatial and environmental monitoring information about the sites. This paper discusses GEMS and its use by LM stakeholders. (authors)

Appetta, J. [U.S. Department of Energy Office of Legacy Management, Pittsburgh, PA (United States); MacMillan, S.; Miller, K.; LaBonte, E. [S.M. Stoller Corporation, Junction, CO (United States)

2007-07-01T23:59:59.000Z

283

Plant maintenance and advanced reactors issue, 2008  

SciTech Connect (OSTI)

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.

Agnihotri, Newal (ed.)

2009-09-15T23:59:59.000Z

284

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)  

SciTech Connect (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

285

Former Reactor Facilities Surveillance and Maintenance and  

E-Print Network [OSTI]

-level radioactive contamination (Cesium-137, Strontium-90, tritium) #12;Former Reactor Facilities Surveillance Cold and Dark (2012) Radiological soil contamination remains below building/cap (Cesium-137, Strontium, and 6 in April Characterizing deep VOC contamination in Industrial Park off-site Install total

Ohta, Shigemi

286

FY 1994 annual summary report of the surveillance and maintenance activities for the Oak Ridge National Laboratory Environmental Restoration Program  

SciTech Connect (OSTI)

The Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program was initiated to manage former waste management and environmental research sites contaminated with radioactive materials and/or hazardous chemicals. The S and M Program is responsible for managing designated sites/facilities from the end of their operating lives until final disposition or site stabilization. To effectively manage and perform the various S and M Program responsibilities, five summary-level work breakdown structure (WBS) elements have been established: S and M Preliminary Investigations, Special Projects, Routine S and M, Inactive Groundwater Wells, and Project Management. Routine S and M activities were conducted as scheduled throughout fiscal years (FY) 1994 at applicable inactive waste management (WM) and other contaminated areas. Overall, the ER S and M Program maintains 47 facilities, performs vegetation maintenance on approximately 230 acres, maintains 54 inactive tanks, and provides overall site management on over 700 acres. In addition to the routine S and M activities, detailed site inspections were conducted at established frequencies on appropriate sites in the ER S and M Program. This document provides a summary of the FY 1994 ORNL ER S and M Program accomplishments.

Not Available

1994-11-01T23:59:59.000Z

287

Second Annual Maintenance, Inspection, and Test Report for PAS-1 Cask Certification for Shipping Payload B  

SciTech Connect (OSTI)

The Nuclear Packaging, Inc. (NuPac), PAS-1 cask is required to undergo annual maintenance and inspections to retain certification in accordance with U.S. Department of Energy (DOE) Certificate of Compliance USA/9184B(U) (Appendix A). The packaging configuration being tested and maintained is the NuPac PAS-1 cask for Payload B. The intent of the maintenance and inspections is to ensure the packaging remains in unimpaired physical condition. Two casks, serial numbers 2162-026 and 2162-027, were maintained, inspected, and tested at the 306E Development, Fabrication, and Test Laboratory, located at the Hanford Site's 300 Area. Waste Management Federal Services, Inc. (WMFS), a subsidiary of GTS Duratek, was in charge of the maintenance and testing. Cogema Engineering Corporation (Cogema) directed the operations in the test facility. The maintenance, testing, and inspections were conducted successfully with both PAS-1 casks. The work conducted on the overpacks included weighing, gasket replacement, and plastic pipe plug and foam inspections. The work conducted on the secondary containment vessel (SCV) consisted of visual inspection of the vessel and threaded parts (i.e., fasteners), visual inspection of sealing surfaces, replacement of O-ring seals, and a helium leak test. The work conducted on the primary containment vessel (PCV) consisted of visual inspection of the vessel and threaded parts (i.e., fasteners), visual inspection of sealing surfaces, replacement of O-ring seals, dimensional inspection of the vessel bottom, a helium leak test, and dye penetrant inspection of the welds. The vermiculite material used in the cask rack assembly was replaced.

KELLY, D.J.

2000-10-09T23:59:59.000Z

288

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr FlickrGuidedCH2M HILL Secretary Moniz atfacilityrecovery Waste Site

289

Site Map  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearchScheduled System Highlights Success Stories ContactSite Map

290

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery:Act-funded KPER TV14 WhiteShimkus CongressmanSite

291

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpgcommunity200 Wlocalplywoodroadship Shipping Mixed,sites 212R

292

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpgcommunity200 Wlocalplywoodroadship Shipping Mixed,sites

293

Site Map  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmitted forHighlightsSeminarsSiliconSite Map TUNL pdf's | FAS pdf's | HTML |

294

Sacandaga Site  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545 OCT 28Sacandaga Site Certification tp2ket

295

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery: VPPDR ReactorFFTF PRCGrip Get aSite visit EdBoard3

296

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery: VPPDR ReactorFFTF PRCGrip Get aSite visit

297

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery: VPPDR ReactorFFTF PRCGrip Get aSite visitARRA

298

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery: VPPDR ReactorFFTF PRCGrip Get aSite

299

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery: VPPDR ReactorFFTF PRCGrip Get aSiteSubcontract for

300

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery: VPPDR ReactorFFTF PRCGrip Get aSiteSubcontract

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery: VPPDR ReactorFFTFIrrigationBasin Waste Site

302

Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Bigfront.jpg Gallery: VPPDR ReactorFFTFIrrigationBasin Waste SiteReactor

303

The Savannah River Site`s Groundwater Monitoring Program. First quarter, 1990  

SciTech Connect (OSTI)

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the first quarter of 1990. It includes the analytical data, field data, well activity data, and the other documentation for this program and provides a record of the program`s activities and rationale and an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of the analytical data and other data, maintenance of the databases containing groundwater monitoring data and related data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

Not Available

1990-10-18T23:59:59.000Z

304

The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1990  

SciTech Connect (OSTI)

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the fourth quarter of 1990. It includes the analytical data, field data, well activity data, and other documentation for this program, provides a record of the program`s activities and rationale, and serves as an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of analytical and other data, maintenance of the databases containing groundwater monitoring data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

Not Available

1991-06-18T23:59:59.000Z

305

An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling  

E-Print Network [OSTI]

An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling Problem, an integrated ACO approach to solve joint production and preventive maintenance scheduling problem very effective solutions for this problem. Key words-- ACO, Production, Preventive maintenance

Paris-Sud XI, Université de

306

Predictive maintenance policy for a gradually deteriorating system subject to stress  

E-Print Network [OSTI]

of optimal maintenance strategies for improving system availability, preventing Preprint submitted and preventive. Preventive maintenance itself can be categorized into two classes: systematic preventive preventive maintenance policies based on the a priori statistical knowledge of the system lifetime [3]. CBM

Paris-Sud XI, Université de

307

Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using a Simulation-Based Approximate  

E-Print Network [OSTI]

Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using Dynamic Programming (ADP) approach for the optimization of Preventive Maintenance (PM) scheduling schedules. I. INTRODUCTION In semiconductor manufacturing systems, or fabs, pre- ventive maintenance (PM

Fernandez, Emmanuel

308

CBM processes are applicable to maintenance activities on complex systems. Southwest Research Institute  

E-Print Network [OSTI]

performance costs, and preventive/ scheduled maintenance replaces parts before the end of their useful life optimizes costs between preventive and corrective maintenance. Preventive Condition Number of FailuresCBM processes are applicable to maintenance activities on complex systems. Southwest Research

Chapman, Clark R.

309

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field  

E-Print Network [OSTI]

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field Kristin Group, Davis, CA, USA 4 Southern California Edison, Irwindale, CA, USA ABSTRACT HVAC maintenance utilities across the nation to include HVAC maintenance measures in energy efficiency programs

California at Davis, University of

310

If your codes run much slower than before the maintenance on...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

codes run much slower after the maintenance on 62514 If your codes hang or run much slower after the maintenance on 62514 June 27, 2014 (0 Comments) During the maintenance on...

311

Maintenance at DOE Legacy Management Sites Weldon Spring Site LTS&M Plan U.S. Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |EnergyonSupport0.pdf5 OPAM SEMIANNUAL REPORTMA EnergyMagna E-Car Opening Magna

312

On-line maintenance methodology development and its applications  

SciTech Connect (OSTI)

With the increasing economic pressures being faced and the potential for shortening outage times under the conditions of deregulated electricity markets in the world, licensees are motivated to get an increasing amount of the on-line maintenance (OLM). The benefits of the OLM includes increased system and plant reliability, reduction of plant equipment and system material condition deficiencies that could adversely impact operations, and reduction of work scope during plant refueling outages. In Korea, allowance guidelines of risk assessment is specified in the safety regulation guidelines 16.7 and 16.8 of the Korea Inst. of Nuclear Safety (KINS), which is 'General guidelines of Risk-informed application for requesting permission of changes' and 'Requesting permission of changes of Risk-informed application for Technical Specification'. We select the emergency diesel generator (EDG) of the Ulchin unit 3 and 4 for risk assessment analysis by applying configuration changes. The EDG which has plant safety level IE belongs to on-site standby power (A, B train EDG) in electric distribution system. The EDG is important component because it should maintain standby status during plant is operating, therefore we select the EDG for target component of risk assessment analysis. The risk assessment is limited to CDF. The risk assessment is performed by using AIMS-PSA Release2. We evaluate CDF by applying the configuration changes with some assumptions. Evaluation of the full power operation and Low power/Shut down operation was performed. This study has been performed for introducing a methodology and performing risk assessment. (authors)

Kim, J.; Jae, M. [Dept. of Nuclear Engineering, Hanyang Univ., 17 Haengdang, Sungdong, Seoul (Korea, Republic of)

2012-07-01T23:59:59.000Z

313

Geometry-Based Sampling of Conformational Transitions in Proteins  

E-Print Network [OSTI]

Structure Article Geometry-Based Sampling of Conformational Transitions in Proteins Daniel Seeliger of the binding site when using a holo structure, or by not identifying the correct binding pose when using an apo

de Groot, Bert

314

Gas turbine combustor transition  

DOE Patents [OSTI]

A method is described for converting a steam cooled transition to an air cooled transition in a gas turbine having a compressor in fluid communication with a combustor, a turbine section in fluid communication with the combustor, the transition disposed in a combustor shell and having a cooling circuit connecting a steam outlet and a steam inlet and wherein hot gas flows from the combustor through the transition and to the turbine section, includes forming an air outlet in the transition in fluid communication with the cooling circuit and providing for an air inlet in the transition in fluid communication with the cooling circuit. 7 figs.

Coslow, B.J.; Whidden, G.L.

1999-05-25T23:59:59.000Z

315

Gas turbine combustor transition  

DOE Patents [OSTI]

A method of converting a steam cooled transition to an air cooled transition in a gas turbine having a compressor in fluid communication with a combustor, a turbine section in fluid communication with the combustor, the transition disposed in a combustor shell and having a cooling circuit connecting a steam outlet and a steam inlet and wherein hot gas flows from the combustor through the transition and to the turbine section, includes forming an air outlet in the transition in fluid communication with the cooling circuit and providing for an air inlet in the transition in fluid communication with the cooling circuit.

Coslow, Billy Joe (Winter Park, FL); Whidden, Graydon Lane (Great Blue, CT)

1999-01-01T23:59:59.000Z

316

FAciLity mAintenAnce College of Rural and Community Development  

E-Print Network [OSTI]

maintenance trends and developing strate- gies for future maintenance needs. Occupational endorsement Program--Troubleshooting HVAC Systems......................................2 CTT F151--Introduction to Plumbing Tools

Hartman, Chris

317

E-Print Network 3.0 - agreement maintenance based Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Computer Technologies and Information Sciences 51 Proposed Program: Reliability-Centered Maintenance (RCM) for the High Flux Isotope Reactor Summary: -Centered Maintenance...

318

E-Print Network 3.0 - anti-psychotic maintenance medication Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Software... Safety and Security Neural networks IVARA www.ivara.com Reliability centered maintenance solutions... maintenance solutions RCM toolkit (report generation)...

319

E-Print Network 3.0 - alternative telomere maintenance Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: plays a role in telomere maintenance. To investigate the possibility that ORC bound to telo- mere... to varying extents in cells with different telomere-maintenance...

320

E-Print Network 3.0 - aircraft maintenance Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for the U.S. Army Logistics Air Fleet Summary: capacity, airfield landing capability, maximum flight range of aircraft, maintenance requirement... mandated maintenance...

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Utah Transit Authority Creating a Model Transit  

E-Print Network [OSTI]

safely · Find, Fix, Follow Up #12;Safety Focus · Safety Culture Safety Ambassadors Safety First MomentUtah Transit Authority Creating a Model Transit Safety Organization Global Level Crossing Safety and Trespasser Prevention Symposium August 2014 Dave Goeres, PE Chief Safety Officer dgoeres@rideuta.com #12

Illinois at Urbana-Champaign, University of

322

Transitions : a sanatorium on the seaside  

E-Print Network [OSTI]

This thesis is about transitions: from sea to hill, from harbour to town, from illness to wellness, from life to death; it is about the passage of time. I chose a dramatic site, in the village where I have spent the past ...

Hermida RodrŪguez, Belťn

1988-01-01T23:59:59.000Z

323

FEMP Offers New Training on Photovoltaic Operations and Maintenance...  

Broader source: Energy.gov (indexed) [DOE]

The seminar will cover operations and maintenance (O&M) best practices for photovoltaic (PV) systems of 100 kW or less, including planning for a PV O&M scope of work and...

324

Long-Term Surveillance Operations and Maintenance Fiscal Year...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that includes objectives published in the 2011-2020...

325

Multi-canister overpack operations and maintenance manual  

SciTech Connect (OSTI)

This manual provides general operating and maintenance instructions for the Multi-Canister Overpack. Procedure outlines included are conceptual in nature and will be modified, expanded, and refined during preparation of detailed operating procedures.

PIERCE, S.R.

1999-06-23T23:59:59.000Z

326

Pre-conceptual Design Assessment of DEMO Remote Maintenance  

E-Print Network [OSTI]

EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/13, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally ...

Loving, A; Sykes, N; Iglesias, D; Coleman, M; Thomas, J; Harman, J; Fischer, U; Sanz, J; Siuko, M; Mittwollen, M; others,

2013-01-01T23:59:59.000Z

327

Method and computer program product for maintenance and modernization backlogging  

DOE Patents [OSTI]

According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

2013-02-19T23:59:59.000Z

328

Gas Turbine Technology, Part B: Components, Operations and Maintenance  

E-Print Network [OSTI]

This paper builds on Part A and discusses the hardware involved in gas turbines as well as operations and maintenance aspects pertinent to cogeneration plants. Different categories of gas turbines are reviewed such as heavy duty aeroderivative...

Meher-Homji, C. B.; Focke, A. B.

329

Job Maintenance and Capital Development Fund (North Carolina)  

Broader source: Energy.gov [DOE]

The Job Maintenance and Capital Development Fund provides annual grants to businesses which are located in Development Tier I counties. The Fund is intended to encourage the retention of...

330

Maintenance Plan Site A and Plot M Palos Forest Preserve, Cook County, Illinois  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '*I_ - A research project in

331

Grand Junction, Colorado, Disposal Site Long-Term Surveillance and Maintenance Program Fact Sheet, July 2001  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$ EGcG ENERGYELIkNATION REPORTFairfield,? . ----_

332

Maintenance Implementation Plan for B Plant. Revision 1  

SciTech Connect (OSTI)

The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ``Nuclear Facilities`` (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation.

Tritt, S.E.

1993-04-01T23:59:59.000Z

333

Technical Insights for Saltstone PA Maintenance  

SciTech Connect (OSTI)

The Cementitious Barriers Partnership (CBP) is a collaborative program sponsored by the US DOE Office of Waste Processing. The objective of the CBP is to develop a set of computational tools to improve understanding and prediction of the long-term structural, hydraulic, and chemical performance of cementitious barriers and waste forms used in nuclear applications. CBP tools are expected to better characterize and reduce the uncertainties of current methodologies for assessing cementitious barrier performance and increase the consistency and transparency of the assessment process, as the five-year program progresses. In September 2009, entering its second year of funded effort, the CBP sought opportunities to provide near-term tangible support to DOE Performance Assessments (PAs). The Savannah River Saltstone Disposal Facility (SDF) was selected for the initial PA support effort because (1) cementitious waste forms and barriers play a prominent role in the performance of the facility, (2) certain important long-term behaviors of cementitious materials composing the facility are uncertain, (3) review of the SDF PA by external stakeholders is ongoing, and (4) the DOE contractor responsible for the SDF PA is open to receiving technical assistance from the CBP. A review of the current (SRR Closure & Waste Disposal Authority 2009) and prior Saltstone PAs (e.g., Cook et al. 2005) suggested five potential opportunities for improving predictions. The candidate topics considered were (1) concrete degradation from external sulfate attack, (2) impact of atmospheric exposure to concrete and grout before closure, such as accelerated slag and Tc-99 oxidation, (3) mechanistic prediction of geochemical conditions, (4) concrete degradation from rebar corrosion due to carbonation, and (5) early age cracking from drying and/or thermal shrinkage. The candidate topics were down-selected considering the feasibility of addressing each issue within approximately six months, and compatibility with existing CBP expertise and already-planned activities. Based on these criteria, the five original topics were down-selected to two: external sulfate attack and mechanistic geochemical prediction. For each of the selected topics, the CBP communicated with the PA analysts and subject matter experts at Savannah River to acquire input data specific to the Saltstone facility and related laboratory experiments. Simulations and analyses were performed for both topics using STADIUM (SIMCO 2008), LeachXS/ORCHESTRA (ECN 2007, Meeussen 2003), and other software tools. These supplemental CBP analyses produced valuable technical insights that can be used to strengthen the Saltstone PA using the ongoing PA maintenance process. This report in part summarizes key information gleaned from more comprehensive documents prepared by Sarkar et al. (2010), Samson (2010), and Sarkar (2010).

Flach, G.; Sarkar, S.; Mahadevan, S.; Kosson, D.

2011-07-20T23:59:59.000Z

334

Site Monitoring Area Maps  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to the Site Monitoring Area (SMA) The Site Monitoring Area sampler Control measures (best management practices) installed at the Site Monitoring Area Structures such as...

335

Applicability of Operational Research Techniques in CANDU Nuclear Plant Maintenance  

SciTech Connect (OSTI)

As previously reported at ICONE 6 in New Orleans, 1996, and ICONE 9 in Niece, 2001, the use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Innovative practices included greatly reducing Reliability Centered Maintenance (RCM) costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is being put in place. Further cost refinement of the station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data is being evaluated. A wide range of Operational Research (OR) literature was reviewed for implementation issues and several encouraging areas were found that will assist in the current effort of evaluating maintenance optimization techniques for nuclear power production. The road ahead is expected to consist first of resolving 25 years of data issues and preserving the data via appropriate knowledge system techniques while post war demographics permit experts to input into the system. Subsequent analytical techniques will emphasize total simplicity to obtain the requisite buy in from Corporate Executives who possibly are not trained in Operational Research. Case studies of containment airlock seal failures are used to illustrate the direct applicability of stochastic processes. Airlocks and transfer chambers were chosen as they have long been known as high maintenance items. Also, the very significant financial consequences of this type of failure will help to focus the attention of Senior Management on the effort. Despite substantial investment in research, improvement in the design of the seal material or configuration has not been achieved beyond the designs completed in the 1980's. Overall, the study showed excellent agreement of the relatively quick stochastic methods with the maintenance programs produced at great cost over years of trial and error. The pivotal role of expert opinion via experienced users/problem owners/maintenance engineers in all phases of the method and its application was noted and will be explored in subsequent efforts. The results are displayed via economic alternatives to more easily attract the attention of Maintenance Managers. Graphical overviews of the data demonstrated that substantial insight can be gained by simply organizing the data into statistically meaningful arrays such as histograms. The conclusions highlight several very positive avenues to evaluate at this particular juncture in time. (author)

Doyle, E. Kevin [Bruce Power LP, Box 4000B12, Tiverton, Ont., N0G2T0 (Canada)

2002-07-01T23:59:59.000Z

336

Site Support Program Plan Infrastructure Program  

SciTech Connect (OSTI)

The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

NONE

1995-09-26T23:59:59.000Z

337

Site Analysis Shadow Analysis Site Objectives  

E-Print Network [OSTI]

On ­ Site Rainwater Collection o Composting Toilets o Green Roof o Indigenous Landscape - Wetlands Building

Kyte, Michael

338

Home Maintenance and Repair Owning a home is a major responsibility.  

E-Print Network [OSTI]

maintenance is conducted. Regular, preventive maintenance can pay off in peace of mind, utility cost savings, routine maintenance helps to prolong the life of the home and may prevent the need for major repairs of Benjamin Franklin, "An ounce of prevention is worth a pound of cure." Regular, routine maintenance enhances

339

Single-machine scheduling with periodic and exible periodic maintenance to minimize maximum tardiness  

E-Print Network [OSTI]

periods often appear in industry due to a machine breakdown (stochastic) or preventive maintenance of machine unavailability. However, in some cases (e.g. preventive maintenance), the maintenance of a machineSingle-machine scheduling with periodic and exible periodic maintenance to minimize maximum

Paris-Sud XI, Université de

340

DYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni  

E-Print Network [OSTI]

. There are mainly two types of maintenance activities: the preventive maintenance, whose activities can be long termDYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni good performance with production means. Especially in maintenance services field where the different

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Analysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H.  

E-Print Network [OSTI]

maintenance interval , and the critical failure rate given that no preventive maintenance is performed (asAnalysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H. SINTEF". The suggested modelling provides means to predict how maintenance tasks will affect the rate of critical

Langseth, Helge

342

Designing an on-line multimedia maintenance manual for a production environment  

E-Print Network [OSTI]

). It is a combination of design-out maintenance (DOM) and preventive maintenance. The focus of DOM is to improve36 Designing an on-line multimedia maintenance manual for a production environment W.P. Brinkman, V.P. Buil, R. Cullen1 , R. Gobits2 and F.L. van Nes e-mail: w.p.brinkman@tue.nl Abstract Maintenance

Brinkman, Willem-Paul

343

Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b,  

E-Print Network [OSTI]

Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b, , Sandra Preventive maintenance a b s t r a c t Today, many industrial companies must face problems raised to make predictive maintenance to prevent a serious breakdown. In addition, the corrective maintenance

Paris-Sud XI, Université de

344

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

345

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

346

Analysis of Subsidence Data for the Bryan Mound Site, Texas  

SciTech Connect (OSTI)

The elevation change data measured at the Bryan Mound Strategic Petroleum Reserve (SPR) site over the last 16+ years has been studied and a model utilized to project elevation changes into the future. The subsidence rate at Bryan Mound is low in comparison with other Strategic Petroleum Reserve sites and has decreased with time due to the maintenance of higher operating pressures and the normal decrease in creep closure rate of caverns with time. However, the subsidence at the site is projected to continue. A model was developed to project subsidence values 20 years into the future; no subsidence related issues are apparent from these projections.

Bauer, Stephen J.

1999-07-01T23:59:59.000Z

347

Analysis of Subsidence Data for the Big Hill Site, Texas  

SciTech Connect (OSTI)

The elevation change data measured at the Big Hill SPR site over the last 10 years has been studied and a model utilized to project elevation changes into the future. The subsidence rate at Big Hill is low in comparison with other Strategic Petroleum Reserve sites and has decreased with time due to the maintenance of higher operating pressures and the normal decrease in creep closure rate of caverns with time. However, the subsidence at the site is projected to continue. A model was developed to project subsidence values 20 years into the future; no subsidence related issues are apparent from these projections.

Bauer, Stephen J.

1999-06-01T23:59:59.000Z

348

Siting handbook for small wind energy conversion systems  

SciTech Connect (OSTI)

This handbook was written to serve as a siting guide for individuals wishing to install small wind energy conversion systems (WECS); that is, machines having a rated capacity of less than 100 kilowatts. It incorporates half a century of siting experience gained by WECS owners and manufacturers, as well as recently developed siting techniques. The user needs no technical background in meteorology or engineering to understand and apply the siting principles discussed; he needs only a knowledge of basic arithmetic and the ability to understand simple graphs and tables. By properly using the siting techniques, an owner can select a site that will yield the most power at the least installation cost, the least maintenance cost, and the least risk of damage or accidental injury.

Wegley, H.L.; Ramsdell, J.V.; Orgill, M.M.; Drake, R.L.

1980-03-01T23:59:59.000Z

349

This construction, refurbishment and maintenance guide identifies the main sustainability factors that need to be considered during the design, refurbishment, construction or ongoing maintenance of buildings on our  

E-Print Network [OSTI]

1 This construction, refurbishment and maintenance guide identifies the main sustainability factors that need to be considered during the design, refurbishment, construction or ongoing maintenance or manage the refurbishment, construction or ongoing maintenance of buildings on behalf of the College. We

Sheldon, Nathan D.

350

Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2  

SciTech Connect (OSTI)

This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or documented ? Provides instructions for implementing annual S&M inspections and activities The following facilities that were included in Revision 1 of this plan have reached final disposition and are no longer in the S&M program: ? Reactor Maintenance, Assembly, and Disassembly Facility, Building 25-3110 ? Test Cell A Facility, Building 25-3113 ? TCC Facility, Building 25-3210 ? Pluto Disassembly Facility, Building 26-2201 ? Super Kukla Facility, Building 27-5400

Poderis, Reed J. [NSTec] [NSTec; King, Rebecca A. [NSTec] [NSTec

2013-09-30T23:59:59.000Z

351

Recommendation 198: Establish a site transition process | Department of  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 |Rebecca Matulka About Us RebeccaReciprocity9:4:

352

Terms and Conditions for Site Transition | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage ¬Ľof Energy StrainClientDesignOffice -Template for aofof Energy

353

Transition of Sites from Environmental Management Memorandum of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage ¬Ľof EnergyThe EnergyDepartment7 thFuel Processor for Enhanced|Understanding

354

Letter: Transition of Closure Sites from the Office of Environmental  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG | DepartmentEnergy InvitationLegal andRegulatoryFunding fortheManagement

355

SunLine Transit Agency Fuel Cell Transit Bus: Fourth Evaluation Report (Report and Appendices)  

SciTech Connect (OSTI)

This report describes operations at SunLine Transit Agency for a prototype fuel cell bus and five new compressed natural gas (CNG) buses. This is the fourth evaluation report for this site, and it describes results and experiences from April 2008 through October 2008. These results are an addition to those provided in the previous three evaluation reports.

Chandler, K.; Eudy, L.

2009-01-01T23:59:59.000Z

356

SunLine Transit Agency Fuel Cell Transit Bus: Fifth Evaluation Report (Report and Appendices)  

SciTech Connect (OSTI)

This report describes operations at SunLine Transit Agency for a prototype fuel cell bus and five compressed natural gas (CNG) buses. This is the fifth evaluation report for this site, and it describes results and experiences from October 2008 through June 2009. These results are an addition to those provided in the previous four evaluation reports.

Eudy, L.; Chandler, K.

2009-08-01T23:59:59.000Z

357

SunLine Transit Agency Fuel Cell Transit Bus: Fifth Evaluation Report-- Appendices  

Broader source: Energy.gov [DOE]

This report describes operations at SunLine Transit Agency for a prototype fuel cell bus and five compressed natural gas (CNG) buses. This is the fifth evaluation report for this site, and it describes results and experiences from October 2008 through June 2009. These results are an addition to those provided in the previous four evaluation reports.

358

Analysis of closed-pool boilup using the TRANSIT-HYDRO code. [LMFBR  

SciTech Connect (OSTI)

The benign termination of the transition phase of a hypothetical LMFBR accident rests on the avoidance of highly energetic recriticalities prior to escape of bottled molten core materials from the active core region. In scenarios where molten fuel is trapped due to axial blockages, the maintenance of subcritical configurations until radial flow paths develop requires stable boil-up of the molten fuel/steel mixture. This paper describes the analysis of an experiment investigating the behavior of closed boiling pools using the two-fluid hydrodynamics module of TRANSIT-HYDRO, a deterministic transition-phase analysis code.

Graff, D.L.

1983-01-04T23:59:59.000Z

359

Hydrogen Transition Infrastructure Analysis  

SciTech Connect (OSTI)

Presentation for the 2005 U.S. Department of Energy Hydrogen Program review analyzes the hydrogen infrastructure needed to accommodate a transitional hydrogen fuel cell vehicle demand.

Melendez, M.; Milbrandt, A.

2005-05-01T23:59:59.000Z

360

Part I. Ecological Sites and Soil Part II. A Framework for Soil and  

E-Print Network [OSTI]

on management (states) (1) (2) (3) (4) (6) (5) #12;State and transition models, by definition, include soil #12;Part II. Ecological sites and state and transition models: A framework for soil and vegetation dynamics and management #12;The soil survey is the foundation of the ecological site inventory process

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Distributed Construction and Maintenance of Bandwidth and Energy Efficient  

E-Print Network [OSTI]

wireless RF technology designed initially for cable replacement at indoor places, but also supports usageDistributed Construction and Maintenance of Bandwidth and Energy Efficient Bluetooth Scatternets on simulations, the paper also presents the improvements in bandwidth-efficiency and reduction in energy

Korpeoglu, Ibrahim

362

CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

363

CRAD, Maintenance- Los Alamos National Laboratory TA 55 SST Facility  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance program at the Los Alamos National Laboratory TA 55 SST Facility.

364

Joint Traffic Blocking and Routing under Network Failures and Maintenances  

E-Print Network [OSTI]

Joint Traffic Blocking and Routing under Network Failures and Maintenances Chao Liang ECE Dept paths. Therefore, it is important to design ingress traffic blocking and routing jointly to achieve a good balance between the two factors. Working towards this goal, we formulate a joint ingress blocking

Liu, Yong

365

CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

366

Winter Performance and Maintenance of Porous Asphalt Pavements  

E-Print Network [OSTI]

Concrete (HSG-B)Porous Asphalt (HSG-C) #12;Cold Climate Performance Results #12;12 Porous Asphalt SurfaceWinter Performance and Maintenance of Porous Asphalt Pavements Robert M. Roseen, Ph.D., P.E., D impacts for new development and reverse impacts in areas with redevelopment. #12;Porous Asphalt Design

367

Enhancing Building Performance Through More Responsive Maintenance System  

E-Print Network [OSTI]

forth). For example, installing a water heater needs a plumber and electrician to complete the job in a traditional maintenance system. With MST principle, this work order can be done by one technician instead of two. In this way work orders...

Alsudairi, A. A.

2012-01-01T23:59:59.000Z

368

The Facility The Propellants North Administrative and Maintenance  

E-Print Network [OSTI]

and Maintenance Facility Inside Propellants North is window glazing and framing from the iconic firing rooms with energy recovery technology · Highly insulated roof and walls · Lighting fixtures with smart lighting glazing and framing · Reclaimed and processed waste concrete from Kennedy's demolition projects

369

Constraint processing for optimal maintenance Daniel Frost and Rina Dechter  

E-Print Network [OSTI]

preventative maintenance of power generating units within a power plant. We show how these problems can be cast competitive CSP algorithms on the main- tenance scheduling benchmark. The authors thank the Electric Power of a CSP : : : : : : : : : : : : : : : : : : : : : : : : : : : 7 2.3 CSP Algorithms

Dechter, Rina

370

Periodic NDE for Bridge Maintenance Ralf W. Arndt  

E-Print Network [OSTI]

Periodic NDE for Bridge Maintenance Ralf W. Arndt NRC Research Associate U.S. Federal Highway Administration NDE Center 6300 Georgetown Pike McLean, VA 22101, USA ralf.arndt@fhwa.dot.gov Frank Jalinoos Program Manager U.S. Federal Highway Administration NDE Center 6300 Georgetown Pike McLean, VA 22101, USA

Huston, Dryver R.

371

Maintenance and Operations of Schools for Energy Efficiency  

E-Print Network [OSTI]

Maintenance and operations of schools with energy efficiency as a priority can reduce annual utility costs 3 to 30 percent. Most school districts do not have an organized plan for tracking energy usage or cost. Energy performance (e.g. Btu/ft^2-yr...

McClure, J. D.; Estes, J. M.

1986-01-01T23:59:59.000Z

372

REST Web Service Maintenance Through API Policy Enforcement  

E-Print Network [OSTI]

1 REST Web Service Maintenance Through API Policy Enforcement Hiranya Jayathilaka, Chandra Krintz 100% annual growth rate [2]. These APIs increasingly employ the REST (Representational State Transfer accessible to users via web application programming interfaces (web APIs) and cloud-based deployment

California at Santa Barbara, University of

373

Model 6000 Laser Controller Operation and Maintenance Manual  

E-Print Network [OSTI]

i Model 6000 Laser Controller Operation and Maintenance Manual #12;Corporate Headquarters Canada by improper use or failure to observe proper operating procedures per the product specification or operators 9002 by the British Standards Institution. #12;Limited Warranty Newport warrants that this product

374

ARIES-CS MAINTENANCE SYSTEM DEFINITION AND ANALYSIS  

E-Print Network [OSTI]

ARIES-CS MAINTENANCE SYSTEM DEFINITION AND ANALYSIS LESTER M. WAGANER* and RICHARD J. PEIPERT, Jr in the electronic version. I. INTRODUCTION The ARIES studies, sponsored by the U.S. Depart- ment of Energy and led how the physics and coil definition determine and influence the power core elements. Especially

375

Collaboration in long-term stewardship at DOE Hanford Site  

SciTech Connect (OSTI)

The U.S. Department of Energy's (DOE) Hanford Site comprises approximately 1,517 km{sup 2} (586 mi{sup 2}) of land in southeastern Washington. The site was established in 1943 as part of the Manhattan Project to produce plutonium for the nation's nuclear weapons program. As the Cold War era came to an end, the mission of the site transitioned from weapons production to environmental cleanup. As the River Corridor area of the site cleanup is completed, the mission for that portion of the site will transition from active cleanup to continued protection of environment through the Long-Term Stewardship (LTS) Program. The key to successful transition from cleanup to LTS is the unique collaboration among three (3) different DOE Programs and three (3) different prime contractors with each contractor having different contracts. The LTS Program at the site is a successful model of collaboration resulting in efficient resolution of issues and accelerated progress that supports DOE's Richland Office 2015 Vision for the Hanford Site. The 2015 Vision for the Hanford Site involves shrinking the active cleanup footprint of the surface area of the site to approximately 20 mi{sup 2} on the Central Plateau. Hanford's LTS Program is defined in DOE's planning document, Hanford Long-Term Stewardship Program Plan, DOE/RL-2010-35 Rev 1. The Plan defines the relationship and respective responsibilities between the federal cleanup projects and the LTS Program along with their respective contractors. The LTS Program involves these different parties (cleanup program and contractors) who must work together to achieve the objective for transition of land parcels. Through the collaborative efforts with the prime contractors on site over the past two years, 253.8 km{sup 2} (98 mi{sup 2}) of property has been successfully transitioned from the cleanup program to the LTS Program upon completion of active surface cleanup. Upcoming efforts in the near term will include transitioning another large parcel that includes one of the six (6) cocooned reactors on site. These accomplishments relied upon the transparency between DOE cleanup programs and their contractors working together to successfully transition the land while addressing the challenges that arise. All parties, the three different DOE Programs and their respective prime contractors are dedicated to working together and continuing the progress of transitioning land to LTS, in alignment with the Program Plan and compliant with contractual requirements. This paper highlights the accomplishments and collaborative efforts to address the challenges faced as work progresses from the cleanup to transitioning of land parcels to LTS Program.

Moren, R. J.; Zeisloft, J. H.; Feist, E. T.; Brown, D.; Grindstaff, K. D.

2013-01-10T23:59:59.000Z

376

SUBCONTRACTOR SITE ACCESS GUIDELINES  

E-Print Network [OSTI]

.............................................................. 5 5. Projects with Off-site Parking Arrangements.................................................................................6 5.1 Initial Screening and Off-site Parking Process................................................................. 9 7.2 Substitute Contractors with Off-site Parking

Eisen, Michael

377

Siting guidelines for utility application of wind turbines. Final report  

SciTech Connect (OSTI)

Utility-oriented guidelines are described for identifying viable sites for wind turbines. Topics and procedures are also discussed that are important in carrying out a wind turbine siting program. These topics include: a description of the Department of Energy wind resource atlases; procedures for predicting wind turbine performance at potential sites; methods for analyzing wind turbine economics; procedures for estimating installation and maintenance costs; methods for anlayzing the distribution of wind resources over an area; and instrumentation for documenting wind behavior at potential sites. The procedure described is applicable to small and large utilities. Although the procedure was developed as a site-selection tool, it can also be used by a utility who wishes to estimate the potential for wind turbine penetration into its future generation mix.

Pennell, W.T.

1983-01-01T23:59:59.000Z

378

Post-Closure Inspection and Monitoring Report for the Salmon, Mississippi, Site Calendar Year 2007  

SciTech Connect (OSTI)

This report summarizes inspection and monitoring activities performed on and near the Salmon, Mississippi, Site in calendar year 2007. The Draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report is submitted to comply with that requirement. The Tatum Salt Dome was used by the U.S. Atomic Energy Commission (AEC) for underground nuclear testing during the cold war. The land surface above the salt dome, the Salmon Site, is located in Lamar County, Mississippi, approximately 12 miles west of Purvis (Figure 1). The U.S. Department of Energy (DOE), the successor to the AEC, is responsible for long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned this responsibility effective October 2006.

None

2008-05-01T23:59:59.000Z

379

Communications in Statistics-Stochastic Models, 16(1), 121-142 (2000) 1 BAYESIAN MAINTENANCE POLICIES DURING A  

E-Print Network [OSTI]

of maintenance policies which consist of minimal repair and preventive maintenance is analyzed for the case preventive maintenance can reduce the age of the machine by x units. Under a constant maintenance costCommunications in Statistics-Stochastic Models, 16(1), 121-142 (2000) 1 BAYESIAN MAINTENANCE

Popova, Elmira

380

Hanford Site Development Plan  

SciTech Connect (OSTI)

The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Adaptive Optimization and Systematic Probing of Infrastructure System Maintenance Policies under Model Uncertainty  

E-Print Network [OSTI]

bridge management system Pontis, transition probabilityeld of pavement management. The data, such as transition

Madanat, S M; Park, Sejung; Kuhn, K D

2006-01-01T23:59:59.000Z

382

Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Second...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Second Evaluation Report and Appendices Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Second Evaluation Report and Appendices This report describes operations at...

383

Software Quality Assurance Plan for GoldSim Models Supporting the Area 3 and Area 5 Radioactive Waste Management Sites Performance Assessment Program  

SciTech Connect (OSTI)

This Software Quality Assurance Plan (SQAP) applies to the development and maintenance of GoldSim models supporting the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) performance assessments (PAs) and composite analyses (CAs). Two PA models have been approved by the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as of November 2006 for the PA maintenance work undertaken by National Security Technologies, LLC (NSTec). NNSA/NSO asked NSTec to assume the custodianship of the models for future development and maintenance. The models were initially developed by Neptune and Company (N&C).

Gregory J. Shott, Vefa Yucel

2007-01-03T23:59:59.000Z

384

Accessibility-based transit planning  

E-Print Network [OSTI]

A method for evaluating transit planning proposals using accessibility metrics is advanced in this research. A transit-accessibility model is developed intended for use by in-house transit agency planning staff as a ...

Busby, Jeffrey R

2004-01-01T23:59:59.000Z

385

Data quality assurance and performance measurement of data mining for preventive maintenance of power grid  

E-Print Network [OSTI]

Ensuring reliability as the electrical grid morphs into the "smart grid" will require innovations in how we assess the state of the grid, for the purpose of proactive maintenance, rather than reactive maintenance; in the ...

Wu, Leon

2011-01-01T23:59:59.000Z

386

Project Profile: Maintenance-Free Stirling Engine for High-Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Maintenance-Free Stirling Engine for High-Performance Dish CSP Project Profile: Maintenance-Free Stirling Engine for High-Performance Dish CSP Image of a prototype 30-kW Stirling...

387

Innovative Contracting Strategies forInnovative Contracting Strategies for Transportation MaintenanceTransportation Maintenancepp  

E-Print Network [OSTI]

Innovative Contracting Strategies forInnovative Contracting Strategies for TransportationResearch Methodology Research Findings and DeliverablesResearch Findings and Deliverables Maintenance Contracting Strategy Selection Framework Maintenance Contracting Strategy Selection Guide Case St dies on Inno ati e

Texas at Austin, University of

388

RFI Seeks Feedback on Third-party Maintenance Strategy for AMO...  

Energy Savers [EERE]

RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools July 28, 2014 -...

389

Policy #1001 Development, Approval and Maintenance of University Policy 1 OLD DOMINION UNIVERSITY  

E-Print Network [OSTI]

Policy #1001 ­ Development, Approval and Maintenance of University Policy 1 OLD DOMINION UNIVERSITY University Policy Policy #1001 DEVELOPMENT, APPROVAL AND MAINTENANCE OF UNIVERSITY POLICY Responsible 4, 2012 A. PURPOSE This policy defines the process for developing, reviewing, approving

390

Recompile if your codes run into MPICH error after the maintenance...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Recompile if your codes run into MPICH errors after the maintenance on 6252014 Recompile if your codes run into MPICH error after the maintenance on 6252014 June 27, 2014 (0...

391

Automated ground maintenance and health management for autonomous unmanned aerial vehicles  

E-Print Network [OSTI]

Automated ground maintenance is a necessity for multi-UAV systems. Without such automation, these systems will become more of a burden than a benefit as human operators struggle to contend with maintenance operations for ...

Dale, Daniel R., M. Eng. Massachusetts Institute of Technology

2007-01-01T23:59:59.000Z

392

Wildfire Policy in Transition Yellowstone  

E-Print Network [OSTI]

Wildfire Policy in Transition 1910 #12;Yellowstone 1988 #12;Colorado South Canyon Fire 1994 #12;#12;Wildfire Policy in Transition 1910 #12;

393

MATHEMATICS: RETHINKING THE TRANSITION  

E-Print Network [OSTI]

SENIOR SECONDARY MATHEMATICS: RETHINKING THE TRANSITION BILL BARTON THE UNIVERSITY OF AUCKLAND, NZ #12;THE ENVISIONING PROJECT · Mathematics education project of NZIMA (New Zealand Institute of Mathematics & Its Applications--the mathematics research funding body). · Brought together mathematics

Peters, Achim

394

Salmon Site Remedial Investigation Report, Main Body  

SciTech Connect (OSTI)

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

US DOE /NV

1999-09-01T23:59:59.000Z

395

Salmon Site Remedial Investigation Report, Appendix C  

SciTech Connect (OSTI)

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

US DOE /NV

1999-09-01T23:59:59.000Z

396

Salmon Site Remediation Investigation Report, Appendix A  

SciTech Connect (OSTI)

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

US DOE /Nevada Operations Office

1999-09-01T23:59:59.000Z

397

Salmon Site Remedial Investigation Report, Appendix D  

SciTech Connect (OSTI)

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

US DOE /NV

1999-09-01T23:59:59.000Z

398

Salmon Site Remedial Investigation Report, Exhibit 5  

SciTech Connect (OSTI)

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

USDOE /NV

1999-09-01T23:59:59.000Z

399

Salmon Site Remedial Investigation Report, Exhibit 4  

SciTech Connect (OSTI)

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

USDOE /NV

1999-09-01T23:59:59.000Z

400

Salmon Site Remedial Investigation Report, Exhibit 3  

SciTech Connect (OSTI)

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

USDOE /NV

1999-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Salmon Site Remedial Investigation Report, Exhibit 2  

SciTech Connect (OSTI)

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

USDOE NV

1999-09-01T23:59:59.000Z

402

Salmon Site Remedial Investigation Report, Exhibit 1  

SciTech Connect (OSTI)

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

USDOE /NV

1999-09-01T23:59:59.000Z

403

Bus Centric Rapid Transit  

E-Print Network [OSTI]

Transfer Center TOD ? SmartCode/CNU Goals ? Public/private development partnership ? Emphasis on the pedestrian ? Bicycle and transit oriented development ? Dover Kohl TOD report, Dec. 2010 ? WTC will be anchor and terminus for BRT 11 18 Westside... Transfer Center 18 18 Five Points TOD #2 15 Five Points TOD 16 ? SmartCode/CNU Goals ? Public/private development partnership ? Emphasis on the pedestrian ? Bicycle and transit oriented development ? Dover Kohl TOD report, Dec. 2010 ? Five...

Banasiak, J.

2011-01-01T23:59:59.000Z

404

Steam turbine restart temperature maintenance system and method  

SciTech Connect (OSTI)

A restart temperature maintenance system is described for a steam turbine system; the steam turbine system comprising a steam turbine, the turbine including a rotation shaft, an outer metal shell means. The restart temperature maintenance system consists of: (a) fastener means affixed to the outer surface of the shell means at predetermined positions; (b) air gap spacer means affixed to the outer surface of the shell means, the air gap spacer means substantially covering the shell means; (c) a plurality of electric heating blanket means of predetermined size and shape positioned in insulative relationship over the air gap spacer means and the heating blanket means maintained in predetermined position by the fastener means; (d) heat sensor means affixed to the outer metal shell means of the steam turbine in predetermined position; (e) power supply means for supplying power to the heating blanket means; (f) heat sensor monitor and controller means connected in circuit between the power supply means and the heat sensor means.

McClelland, T.R.

1986-04-29T23:59:59.000Z

405

Plant maintenance and plant life extension issue, 2008  

SciTech Connect (OSTI)

The focus of the March-April issue is on plant maintenance and plant life extension. Major articles include the following: Exciting time to be at the U.S. NRC, by Dale Klein, Nuclear Regulatory Commission; Extraordinary steps to ensure a minimal environmental impact, by George Vanderheyden, UniStar Nuclear Energy, LLC.; Focused on consistent reduction of outages, by Kevin Walsh, GE Hitachi Nuclear Energy; On the path towards operational excellence, by Ricardo Perez, Westinghouse Electric Company; Ability to be refuelled on-line, by Ian Trotman, CANDU Services, Atomic Energy of Canada, Ltd.; ASCA Application for maintenance of SG secondary side, by Patrick Wagner, Wolf Creek Nuclear Operating Corporation, Phillip Battaglia and David Selfridge, Westinghouse Electric Company; and, An integral part of the landscape and lives, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Steam generator bowl drain repairs, by John Makar and Richard Gimple, Wolf Creek Nuclear Operating Corporation.

Agnihotri, Newal (ed.)

2008-03-15T23:59:59.000Z

406

Draft of new maintenance standards for LWR in Japan  

SciTech Connect (OSTI)

Activities of development of new maintenance standards for operating nuclear power plant in Japan are described. The work of drafting the standards has been done by the Committee of Nuclear Plant Operation and Maintenance Standards (POMS), that was organized in the Japan Power Engineering and Inspection Corporation under the entrustment from the Ministry of International Trade and Industry. The articles of ASME Section XI related to inspection, flaw evaluation and repair have been examined and modified, if necessary, so as to introduce latest Japanese database and technological knowledge. In the area of repairs, many repair techniques verified in recent years in Japan were incorporated i n addition to those specified in ASME Section XI. Finally major differences between ASME Section XI and the draft of the standards are listed.

Iida, Kunihiro [Shibaura Inst. of Tech., Tokyo (Japan). Dept. of Mechanical Engineering

1996-12-01T23:59:59.000Z

407

Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated  

E-Print Network [OSTI]

Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem study on joint production and preventive maintenance scheduling strategies regarding flowshop problems, Preventive maintenance, Joint scheduling, GA, Taboo search, NEH heuristic, Flowshop. 1. Introduction

Boyer, Edmond

408

SCHEDULED AND SHM STRUCTURALAIRFRAME MAINTENANCE APPLICATIONS USING A NEW PROBABILISTIC MODEL  

E-Print Network [OSTI]

philosophies have therefore evolved towards the preventive condition-based maintenance [3,4]. This conceptSCHEDULED AND SHM STRUCTURALAIRFRAME MAINTENANCE APPLICATIONS USING A NEW PROBABILISTIC MODEL Léa D.cot@insa-toulouse.fr ABSTRACT This paper focuses on aircraft structure maintenance. A general mathematical framework based

Boyer, Edmond

409

`ODDS ALGORITHM'-BASED OPPORTUNITY-TRIGGERED PREVENTIVE MAINTENANCE WITH PRODUCTION POLICY  

E-Print Network [OSTI]

1 `ODDS ALGORITHM'-BASED OPPORTUNITY-TRIGGERED PREVENTIVE MAINTENANCE WITH PRODUCTION POLICY THOMAS.monnin}@cran.uhp-nancy.fr Abstract: In the field of manufacturing, the planning of opportunistic preventive maintenance actions' (Bruss algorithm), opportunistic preventive maintenance. 1. INTRODUCTION With today's growing demand

Paris-Sud XI, Université de

410

Optimizing with constraints: a case study in scheduling maintenance of electric power units  

E-Print Network [OSTI]

industry is that of optimally schedul­ ing preventative maintenance of power generating units within of the electric power industry: optimally scheduling preventative maintenance of power generating units within or two dozen power generating units which can be individually scheduled for preventive maintenance. Both

Dechter, Rina

411

GENERATION D'INDICATEURS DANS LE CADRE D'UNE POLITIQUE DE MAINTENANCE PREVENTIVE CONDITIONNELLE  

E-Print Network [OSTI]

GENERATION D'INDICATEURS DANS LE CADRE D'UNE POLITIQUE DE MAINTENANCE PREVENTIVE CONDITIONNELLE Indicators generation as part of a policy of conditional preventive maintenance Pascal VRIGNAT, Manuel AVILA DE MAINTENANCE PREVENTIVE CONDITIONNELLE, Tours : France (2012)" #12;- le système se dégrade

Paris-Sud XI, Université de

412

Methodology for assessing system performance loss within a proactive maintenance framework  

E-Print Network [OSTI]

role, the practices are required to move from corrective maintenance to preventive and even proactiveMethodology for assessing system performance loss within a proactive maintenance framework P,alexandre.voisin,eric.levrat,benoit.iung}@cran.uhp-nancy.fr) Abstract: Maintenance plays now a critical role

Boyer, Edmond

413

Mathematical optimization of a flexible job shop problem including preventive maintenance and  

E-Print Network [OSTI]

1 Mathematical optimization of a flexible job shop problem including preventive maintenance as the scheduling problem includes limited availability of fixtures and preventive maintenance planning periodicity, a number of preventive maintenance activities need to be carried out in some of the resources

Patriksson, Michael

414

A Tool to Support Knowledge Based Software Maintenance: The Software Service Jonathan I. Maletic  

E-Print Network [OSTI]

]: · Corrective · Perfective · Adaptive · Preventive/ Preservation Corrective maintenance is the correction, and corrective were originally used by Swanson [15]. Preventive maintenance is done to improve the future,8,14,12] and preventive maintenance is rarely done. However, it is assumed that a good software development methodology

Maletic, Jonathan I.

415

Scheduling predictive maintenance in flow-shop Christophe Varnier, Noureddine Zerhouni  

E-Print Network [OSTI]

. Predictive maintenance is an answer to prevent equipment from risk of breakdowns while minimizing, for each machine, the control mode and if necessary the preventive maintenance plan. I. INTRODUCTION to prevent equipment from risk of breakdowns while minimizing the maintenance costs. Nevertheless, conflicts

Boyer, Edmond

416

MTTF of a 1 out of n system with preventive maintenance Christiane CocozzaThivent  

E-Print Network [OSTI]

MTTF of a 1 out of n system with preventive maintenance Christiane Cocozza¬≠Thivent Universit¬īe de. The working item is submitted to an age preventive maintenance: when this item reachs age a, it is replaced by a waiting item if there is one. If not the system fails. The duration of the preventive maintenance is equal

Cocozza-Thivent, Christiane

417

LS-SVM based regression and spectral clustering for predicting maintenance of machines  

E-Print Network [OSTI]

with sensory3 faults have been used [? ],[? ],[? ]: corrective maintenance, preventive main-4 tenance, manual the machine fails, it is expensive and6 safety and environmental issues arise. Preventive maintenance is basedLS-SVM based regression and spectral clustering for predicting maintenance of machines Rocco

418

How Much Does Unused Code Matter for Maintenance? Sebastian Eder, Maximilian Junker, Elmar Jurgens, Benedikt Hauptmann  

E-Print Network [OSTI]

effort can thus be expected to be low. On the other hand, however, preventive and adaptive maintenance [3. The remaining changes comprise adaptive and preventive maintenance. We thus have to expect unnecessary codeHow Much Does Unused Code Matter for Maintenance? Sebastian Eder, Maximilian Junker, Elmar J

419

Condition based maintenance model for a production deteriorating Phuc Do Van and Christophe Berenguer  

E-Print Network [OSTI]

significantly and the system might not be able to cope with demand. In many preventive maintenance policiesCondition based maintenance model for a production deteriorating system Phuc Do Van and Christophe both maintenance cost and production capacity aspects for a single unit production system whose

Boyer, Edmond

420

Optimizing with constraints: a case study in scheduling maintenance of electric power units  

E-Print Network [OSTI]

is that of optimally schedul- ing preventative maintenance of power generating units within a power plant. We show how: optimally scheduling preventative maintenance of power generating units within a power plant. We de ne can be individually scheduled for preventive maintenance. Both the required duration of each unit

Dechter, Rina

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

304 IEEE TRANSACTIONS ON RELIABILITY, VOL. 54, NO. 2, JUNE 2005 Integrating Preventive Maintenance Planning and  

E-Print Network [OSTI]

304 IEEE TRANSACTIONS ON RELIABILITY, VOL. 54, NO. 2, JUNE 2005 Integrating Preventive Maintenance & Conclusions--Preventive maintenance planning, and production scheduling are two activities that are inter-depen- dent but most often performed independently. Considering that preventive maintenance, and repair affect

Kutanoglu, Erhan

422

Optimisation par algorithme gntique de la maintenance prventive dans un contexte de modlisation par modles  

E-Print Network [OSTI]

would be to apply a preventive maintenance in order to limit or even prevent system breakdowns (failures). But if the preventive maintenance is not properly regulated, we risk to face excessive costs and unnecessary system downtime. Given this situation, we should so consider establishing preventive maintenance strategies

Boyer, Edmond

423

Advanced Maintenance Modelling StatAvaries : An original multinet decision support tool for  

E-Print Network [OSTI]

the use of the preventive maintenance strategies on the availability of the network whereas the last model and preventive maintenance actions to delays before broken rails detection and related number of missed trains (aAdvanced Maintenance Modelling 1 StatAvaries : An original multinet decision support tool

Paris-Sud XI, Université de

424

Leon County Extension -615 Paul Russell Rd. -Tallahassee Limited Commercial Landscape Maintenance Certification  

E-Print Network [OSTI]

Leon County Extension - 615 Paul Russell Rd. - Tallahassee Limited Commercial Landscape Maintenance Certification Training Class & Exam Wednesday, March 21, 2012 If you work for a commercial landscape maintenance requires that you have a limited commercial landscape maintenance certification. To take the test

Watson, Craig A.

425

Low-maintenance Landscape Plants for South Florida Jody Haynes1  

E-Print Network [OSTI]

Low-maintenance Landscape Plants for South Florida Jody Haynes1 , John McLaughlin2 , Laura Vasquez3 landscape plants suitable for south Florida. The resulting list includes over 350 low-maintenance plants in the Florida Yards & Neighborhoods (FYN) program in Miami-Dade County for a list of recommended low-maintenance

Jawitz, James W.

426

Problem Solution Results Conclusion Predictive maintenance for the heated hold-up tank  

E-Print Network [OSTI]

Problem Solution Results Conclusion Predictive maintenance for the heated hold-up tank B. de, Helsinki Predictive maintenance for the heated hold-up tank #12;Problem Solution Results Conclusion Outline 1 Maintenance problem The heated hold-up tank Optimization problem 2 Numerical solution Mathematical

De Saporta, Beno√ģte

427

The Engineered Approach to Energy and Maintenance Effective Steam Trapping  

E-Print Network [OSTI]

., Chemical Engineering 9/1/75. 4. Maintenance Engineering, May 1976. 5. "How Much Does Lost Steam Cost",Armstrong Machine works, Hydrocarbon Processing, p.129, Jan. 1976. 6. "Setter Steam Trapping Cuts Energy Waste", wesley Yates, Yarway Corp..., Georgia Tech Industrial Energy Extension Service, Chemical Engineering, 2/11/80. 10. ''Basic Facts & Enerqv Saving Tips" ,Lawrence R. O'Dell, Armstrong Machine Works, Heating/Piping/ Air Conditioning, May 1977. 11. Steam Trap Report - Energy Loss...

Krueger, R. G.; Wilt, G. W.

1980-01-01T23:59:59.000Z

428

Object-oriented development of EMS maintenance and documentation tools  

SciTech Connect (OSTI)

This paper describes the use of an object-oriented application framework to implement a PC-based tool kit for use by EMS software support personnel in software maintenance activities including training, documentation development, and trouble-analysis. In addition to a description of the development of the underlying code which provides the tool kit functionality, the paper describes the steps necessary to instantiate the tool kit on a given EMS subsystem.

Sanders, C.W. [Entergy Services, Inc., Pine Bluff, AR (United States). Power System Operations Dept.

1995-12-31T23:59:59.000Z

429

ExxonMobil Olefins Plant Projects, Maintenance and Optimizations  

E-Print Network [OSTI]

are endothermic and there are drastic differences in temperature and pressure across the process Quench & Heat Recovery Steam Cracker Furnace Compression Refrigeration Fractionation Cracked Products ProductsFeed Fuel 60% 35% 5% Ethylene Plant Energy Consumption...ExxonMobil Olefins Plant Projects, Maintenance and Optimizations Matt Neely Utilities Coordinator ExxonMobil Baytown Olefins Plant 2014 IETC May 21, 2014 ESL-IE-14-05-02 Proceedings of the Thrity-Sixth Industrial Energy Technology Conference New...

Neely, M. M.

2014-01-01T23:59:59.000Z

430

Open source software development and maintenance: an exploratory analysis  

E-Print Network [OSTI]

.3 Significance of Software Development and Maintenance Research. 6 1.4 Research Scope???????????????????? 7 1.5 Organization of this Dissertation?????????????. 9 II PROJECT VIABILITY: A MULTIDIMENSIONAL MEASURE?. 10 2... ???????. 89 4.7 Acceptable ranges of ROC value?????????????????. 90 4.8 Classification for the LR model?????????????????? 93 4.9 Process related variable measurement and sources?????????? 99 xi TABLE Page 4.10 Product related variable...

Raja, Uzma

2009-06-02T23:59:59.000Z

431

Community Wind Handbook/Plan for Maintenance | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentratingRenewable Solutions LLC Jump to: navigation, search Name: Communityfor Maintenance <

432

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

433

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

434

PHP SCILAB | .. | 1 (Web Site) Web Site ,  

E-Print Network [OSTI]

PHP SCILAB | .. | 1 Chapter 1 , (Web Site) Web Site , (World Wide Web) : http://school.obec.go.th/borkruwitt/inter/internet01.gif HTML PHP,JavaScript,ASP PHP SCILAB AppServ PHP http://www.appservnetwork.com #12; PHP SCILAB | .. | 2 1. 2. Next 3. I

Kovintavewat, Piya

435

Certificate in Transit Management and  

E-Print Network [OSTI]

Certificate in Transit Management and Operations UMass Transit, in partnership with the UMass Transportation Center and CTTransit, are pleased to offer "A Certificate in Transit Management and Operations Engineering and the School of Management - Internships with UMass Transit and CTTransit - A summer workshop

Massachusetts at Amherst, University of

436

Certificate in Transit Management and  

E-Print Network [OSTI]

Certificate in Transit Management and Operations UMass Transit, in partnership with the UMass Transportation Center and CTTransit, are pleased to offer "A Certificate in Transit Management and Operations contract to provide transit management services in Hartford and other cities in Connecticut. CTTRANSIT

Massachusetts at Amherst, University of

437

Fire Protection Program fiscal year 1996, site support program plan Hanford Fire Department. Revision 2  

SciTech Connect (OSTI)

The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under a mutual aid agreement and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System). The fire department also provides site fire marshal overview authority, fire system testing and maintenance, self-contained breathing apparatus maintenance, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This report gives a program overview, technical program baselines, and cost and schedule baseline.

Good, D.E.

1995-09-01T23:59:59.000Z

438

Fire protection program fiscal year 1995 site support program plan, Hanford Fire Department  

SciTech Connect (OSTI)

The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under a mutual aid agreement and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System). The fire department also provides site fire marshal overview authority, fire system testing and maintenance, self-contained breathing apparatus maintenance, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This report describes the specific responsibilities and programs that the HFD must support and the estimated cost of this support for FY1995.

Good, D.E.

1994-09-01T23:59:59.000Z

439

Examining hydrogen transitions.  

SciTech Connect (OSTI)

This report describes the results of an effort to identify key analytic issues associated with modeling a transition to hydrogen as a fuel for light duty vehicles, and using insights gained from this effort to suggest ways to improve ongoing modeling efforts. The study reported on here examined multiple hydrogen scenarios reported in the literature, identified modeling issues associated with those scenario analyses, and examined three DOE-sponsored hydrogen transition models in the context of those modeling issues. The three hydrogen transition models are HyTrans (contractor: Oak Ridge National Laboratory), MARKAL/DOE* (Brookhaven National Laboratory), and NEMS-H2 (OnLocation, Inc). The goals of these models are (1) to help DOE improve its R&D effort by identifying key technology and other roadblocks to a transition and testing its technical program goals to determine whether they are likely to lead to the market success of hydrogen technologies, (2) to evaluate alternative policies to promote a transition, and (3) to estimate the costs and benefits of alternative pathways to hydrogen development.

Plotkin, S. E.; Energy Systems

2007-03-01T23:59:59.000Z

440

Office of Legacy Management. Information and Records Management. Transition Guidance  

SciTech Connect (OSTI)

The Office of Legacy Management (LM) is an integral part of the U.S. Department of Energyís (DOEís) strategy to ensure that legacy liabilities of former nuclear weapons production sites are properly managed following the completion of environmental cleanup activities. LM will work with each site using an integrated team approach to ensure a successful transition. Part of this process will include transition of Government records and information. The Office of Legacy Management Information and Records Management Transition Guidance focuses on LMís goal to preserve and protect legacy records and information. This guidance document establishes a framework for the transfer of records management responsibilities for sites transferring to LM. It describes the requirements, responsibilities, and procedures for the efficient and cost-effective transfer of custody, ownership, and management of records and other information products from the transfer site to LM. Records management practices are critical to the functions of Federal agencies because records provide information about, or evidence of, the organization, functions, policies, decisions, procedures, operations, or other activities. Therefore, the information generated by an agency is created, maintained, and dispositioned through records management processes that ensure the appropriate preservation and retrieval of essential information. Because of their intrinsic value, best practices to preserve information and records should be utilized when records are transferred from one organization to another. As the transfer program completes cleanup activities at closure sites, a transitional process will facilitate the transparent shift in the management of site records activities to LM. The roles and responsibilities of the transfer site and/or program and LM described in this document are a necessary foundation for cooperation and coordination and are essential to the successful transition of records and information responsibilities. The DOE Office of the Chief Information Officer (OCIO) has a central role in DOE records management by providing guidance, expertise, and coordination to all DOE offices and organizations and coordination with the National Archives and Records Administration (NARA). LM and the transfer site will complete an integrated transition plan which will integrate all transition elements including information and records. As part of the overall transition plan, an Information and Records Transition Plan will be developed consistent with the integrated transition plan for the site transfer and included as an attachment. The Information and Records Management Transition Plan will be developed to assist both organizations in organizing the tasks; establishing a timetable and milestones for their completion; and identifying manpower, funding and other resources that will be needed to complete the ownership transfer. In addition, the plan will provide a valuable exchange of institutional knowledge that will assist LM in meeting the obligations of responsibly managing legacy records. Guidance for the development of the plan is included in this document. Records management concerns that may arise during site closure, such as management support, contract language and agreements, interactions with the OCIO and NARA, resource and budget considerations, and procedures to safeguard records are addressed. Guidelines and criteria for records management transition activities are also provided. These include LM expectations for the inventory, scheduling, and disposition of records; the management and transfer of electronic files, including databases and software; records finding aids, indices, and recordkeeping systems; and the process for the transfer of hard copy and electronic records to LM.

none,

2004-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Overview of Science and Technology Improvements at Office of Legacy Management Sites  

SciTech Connect (OSTI)

The U.S. Department of Energy Office of Legacy Management (LM) supports science and technology (S and T) initiatives to more effectively manage LM sites, help protect human health and the environment, and reduce long-term costs of site maintenance and remediation by ensuring that sound engineering and scientific principles are used. Through the use of telemetry, LM's SOARS (System Operation and Analysis of Remote Sites) project provides project scientists and engineers with timely information needed to evaluate, maintain, and optimize remediation systems, while limiting the amount of required travel. This paper presents three recent S and T activities focused on enhancing remediation of ground water at LM sites. (authors)

Morrison, S.; Bartlett, T.; Boylan, J.; Carpenter, C.; Miller, D. [S.M. Stoller Corporation, Grand Junction, Colorado (United States); Kothari, V. [U.S. Department of Energy, Office of Legacy Management, West Virginia (United States)

2007-07-01T23:59:59.000Z

442

Environmental restoration plan for the transfer of surplus facilities to the Facility Transition Program at Oak Ridge National Laboratory  

SciTech Connect (OSTI)

This report will provide guidance on management, coordination, and integration of plans to transition facilities to the Facility Transition Program and activities as related to the Oak Ridge National Laboratory (ORNL) Environmental Restoration Program facilities. This report gives (1) guidance on the steps necessary for identifying ORNL surplus facilities, (2) interfaces of Surveillance and Maintenance (S and M) and Isotope Facility Deactivation program managers, (3) roles and responsibilities of the facility managers, and (4) initial S and M requirements upon acceptance into the Facility Transition Program.

NONE

1995-08-01T23:59:59.000Z

443

EIS-0359: Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky Site  

Broader source: Energy.gov [DOE]

This site-specific EIS considers the construction, operation, maintenance, and decontamination and decommissioning of the proposed depleted uranium hexafluoride (DUF6) conversion facility at three locations within the Paducah site; transportation of depleted uranium conversion products and waste materials to a disposal facility; transportation and sale of the hydrogen fluoride (HF) produced as a conversion co-product; and neutralization of HF to calcium fluoride and its sale or disposal in the event that the HF product is not sold.

444

St. Louis Metro Biodiesel (B20) Transit Bus Evaluation: 12-Month Final Report  

SciTech Connect (OSTI)

The St. Louis Metro Bodiesel Transit Bus Evaluation project is being conducted under a Cooperative Research and Development Agreement between NREL and the National Biodiesel Board to evaluate the extended in-use performance of buses operating on B20 fuel. The objective of this research project is to compare B20 and ultra-low sulfur diesel buses in terms of fuel economy, veicles maintenance, engine performance, component wear, and lube oil performance.

Barnitt, R.; McCormick, R. L.; Lammert, M.

2008-07-01T23:59:59.000Z

445

Operating and maintenance experience with a 6-kW wind energy conversion system at Naval Station, Treasure Island, California. Technical note Sep 79-Jun 81  

SciTech Connect (OSTI)

The experience gained and lessons learned from the 6-kW grid-integrated Wind Energy Conversion System (WECS) demonstration at Naval Station, Treasure Island, San Francisco Bay are detailed. The objective of this demonstration was to develop operating experience and maintenance information on the 6-kW WECS using a combination of permanent magnet alternator with a line commutated synchronous inverter. The on-site measurements conducted during the demonstation indicate that the WECS site has annual average windspeeds of about 8 to 10 mph. The test results to data indicate a satisfactory performance of the WECS except for two failures involving arcing at the electrical terminals located on the yaw shaft. Due to wind characteristics encountered at the site, the performance data collected to date are at windspeeds of 20 mph or lower. For evaluating the WECS performance at all windspeeds, location at a windier site with annual average windspeeds of 14 mph or higher is recommended.

Pal, D.

1982-07-01T23:59:59.000Z

446

Practical Maintenance of Digital Systems: Guidance to Maximize the Benefits of Digital Technology for the Maintenance of Digital Systems and Plant Equipment  

SciTech Connect (OSTI)

This report presents detailed guidance for the maintenance and testing of modern digital systems. The guidance provides practical means for plants to take advantage of the increased diagnostic and self-test capabilities of these systems. It helps plants avoid mistakes in design and installation that could lead to increased maintenance burden and decreased system reliability and availability.

Hill, D; Scarola, K

2004-10-30T23:59:59.000Z

447

DOE-EM-45 PACKAGING OPERATIONS AND MAINTENANCE COURSE  

SciTech Connect (OSTI)

Savannah River National Laboratory - Savannah River Packaging Technology (SRNL-SRPT) delivered the inaugural offering of the Packaging Operations and Maintenance Course for DOE-EM-45's Packaging Certification Program (PCP) at the University of South Carolina Aiken on September 1 and 2, 2009. Twenty-nine students registered, attended, and completed this training. The DOE-EM-45 Packaging Certification Program (PCP) sponsored the presentation of a new training course, Packaging Maintenance and Operations, on September 1-2, 2009 at the University of South Carolina Aiken (USC-Aiken) campus in Aiken, SC. The premier offering of the course was developed and presented by the Savannah River National Laboratory, and attended by twenty-nine students across the DOE, NNSA and private industry. This training informed package users of the requirements associated with handling shipping containers at a facility (user) level and provided a basic overview of the requirements typically outlined in Safety Analysis Report for Packaging (SARP) Chapters 1, 7, and 8. The course taught packaging personnel about the regulatory nature of SARPs to help reduce associated and often costly packaging errors. Some of the topics covered were package contents, loading, unloading, storage, torque requirements, maintaining records, how to handle abnormal conditions, lessons learned, leakage testing (including demonstration), and replacement parts. The target audience for this course was facility operations personnel, facility maintenance personnel, and field quality assurance personnel who are directly involved in the handling of shipping containers. The training also aimed at writers of SARP Chapters 1, 7, and 8, package designers, and anyone else involved in radioactive material packaging and transportation safety. Student feedback and critiques of the training were very positive. SRNL will offer the course again at USC Aiken in September 2010.

Watkins, R.; England, J.

2010-05-28T23:59:59.000Z

448

NPP operation and maintenance with French-built NPPs  

SciTech Connect (OSTI)

In France, 80% of the electricity production will be nuclear in 1990. More than to-day, PWR units will be operated by Electricite de France on a load-follow basis. Every effort is made to reduce planned and forced outages. Maintenance is shared between EdF and Framatome, the latter being in charge of high technology operations. All these actions are eased by the standardization of units, within each power class, the resulting build-up of experience being available to all PWR operators in the world, more particularly those of Framatome-built units.

Mira, J.J.; Charbonneau, S.

1988-01-01T23:59:59.000Z

449

Building 9401-2 Plating Shop Surveillance and Maintenance Plan  

SciTech Connect (OSTI)

This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure that Building 9401-2 Plating Shop is maintained in a cost effective and environmentally secure configuration until subsequent closure during the final disposition phase of decommissioning. U.S. Department of Energy (DOE) G430.1A-2, Surveillance and Maintenance During Facility Disposition (1997), was used as guidance in the development of this plan. The S and M Plan incorporates DOE O 430.1A, Life Cycle Asset Management (LCAM) (1998a) direction to provide for conducting surveillance and maintenance activities required to maintain the facility and remaining hazardous and radioactive materials, wastes, and contamination in a stable and known condition pending facility disposition. Recommendations in the S and M plan have been made that may not be requirement-based but would reduce the cost and frequency of surveillance and maintenance activities. During the course of S and M activities, the facility's condition may change so as to present an immediate or developing hazard or unsatisfactory condition. Corrective action should be coordinated with the appropriate support organizations using the requirements and guidance stated in procedure Y10-202, Rev. 1, Integrated Safety Management Program, (Lockheed Martin Energy Systems, Inc. (LMES), 1998a) implemented at the Oak Ridge Y-12 Plant and the methodology of the Nuclear Operations Conduct of Operations Manual (LMES, 1999) for the Depleted Uranium Operations (DUO) organization. The key S and M objectives applicable to the Plating Shop are to: Ensure adequate containment of remaining residual material in exhaust stacks and outside process piping, stored chemicals awaiting offsite shipment, and items located in the Radioactive Material Area (RMA); Provide access control into the facility and physical safety to S and M personnel; Maintain the facility in a manner that will protect the public, the environment, and the S and M personnel; Provide an S and M plan which identifies and complies with applicable environmental, safety, and health safeguards and security requirements; and Provide a cost effective S and M program for the plating shop, Building 9401-2.

None

1999-05-01T23:59:59.000Z

450

Plant maintenance and plant life extension issue, 2007  

SciTech Connect (OSTI)

The focus of the March-April issue is on plant maintenance and plant life extension. Major articles/reports in this issue include: Three proposed COLs expected in 2007, by Dale E. Klein, U.S. Nuclear Regulatory Commission; Delivering behaviors that our customers value, by Jack Allen, Westinghouse Electric Company; Facilitating high-level and fuel waste disposal technologies, by Malcolm Gray, IAEA, Austria; Plant life management and long-term operation, by Pal Kovacs, OECD-NEA, France; Measuring control rod position, by R. Taymanov, K. Sapozhnikova, I. Druzhinin, D.I. Mendeleyev, Institue for Metrology, Russia; and, 'Modernization' means higher safety, by Svetlana Genova, Kozluduy NPP plc, Bulgaria.

Agnihotri, Newal (ed.)

2007-03-15T23:59:59.000Z

451

Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministration -Lowellfor 2013 | Jefferson Lab Maintenance

452

B1.3 SWCX for Routine Maintenance Services-  

Broader source: Energy.gov (indexed) [DOE]

Site, as necessary. Use of the equipment and associated vehicles would generate air pollutants from combustion and possibly limited ground- disturbance, local noise levels would...

453

Variational transition state theory  

SciTech Connect (OSTI)

This research program involves the development of variational transition state theory (VTST) and semiclassical tunneling methods for the calculation of gas-phase reaction rates and selected applications. The applications are selected for their fundamental interest and/or their relevance to combustion.

Truhlar, D.G. [Univ. of Minnesota, Minneapolis (United States)

1993-12-01T23:59:59.000Z

454

TRANSITION STRATEGIES Sig Gronich  

E-Print Network [OSTI]

Options. ·Natural Gas Hydrogen · Biomass Hydrogen ·Distributed Coal / IGCC Hydrogen · Compressed Gas special attention to the transition to a nascent hydrogen economy · Analyze cost goals and Liquid Storage · Electrolysis · Compressed Gas Delivery · Cold Gas Delivery and Liquid Delivery · Co

455

Transition Implementation Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide was prepared to aid in the development, planning, and implementation of requirements and activities during the transition phase at Department of Energy (DOE) facilities that have been declared or are forecast to become excess to any future mission requirements.

2001-04-24T23:59:59.000Z

456

Leveraging infrastructure : sustainable bus rapid transit route planning in Beirut, Lebanon  

E-Print Network [OSTI]

This thesis applies the concepts of urban design, public transportation planning, economic development, and sustainability, to the routing and site plan of a two-kilometer bus rapid transit (BRT) line segment into downtown ...

Nabti, Jumana M., 1976-

2004-01-01T23:59:59.000Z

457

Managing contaminated sites  

SciTech Connect (OSTI)

This book summarizes the generic principles of contaminated site management. The book walks the reader through contaminated site identification, risk assessment and the evaluation of remediation alternatives. The book is divided into two major sections, problem diagnosis and development of site restoration. In problem diagnosis, the general principles of site investigation are discussed, including the objectives and differences between tier 1,2, and 3 investigations. The principles of data collection and analysis are presented. A small quantitative discussion of statistical analysis is presented but in keeping with the objectives of the text is not sufficient comprehensive or detailed to provide much of a guide for the practitioner. Chapters on contaminant fate and transport processes and risk assessment help the reader understand the role of these issues in site investigation and remedial planning. A chapter is also included on elements of a site characterization activity, which summarizes some of the key considerations in conducting a site investigation.

Asante-Duah, D.K.

1997-12-31T23:59:59.000Z

458

Maintenance Testing of Mixed-Signal Boards: the FCB Technical Report LiSyc, UBO Brest (France), June 2005  

E-Print Network [OSTI]

a part of his work. In maintenance, one may distinguish preventive maintenance from corrective1 Maintenance Testing of Mixed-Signal Boards: the FCB case study Technical Report LiSyc, UBO Brest, Fax: +33 298 340 986 bruno.castel@isismpp.fr Keywords: Maintenance testing, mixed-signal board testing

Boyer, Edmond

459

IEEE TRANSACTIONS ON RELIABILITY, VOL. 59, NO. 2, JUNE 2010 393 Optimal Maintenance Strategies for Wind Turbine  

E-Print Network [OSTI]

and maintenance. ACRONYMS NA no action PM preventive maintenance OB observation CM corrective maintenance OIEEE TRANSACTIONS ON RELIABILITY, VOL. 59, NO. 2, JUNE 2010 393 Optimal Maintenance Strategies decisions. Based on the information from sensors, our research objective is to derive an optimal preventive

Ding, Yu

460

Dynamic grouping maintenance strategy with time limited opportunities Phuc Do Van, Florent Brissaud, Anne Barros, Christophe Berenguer  

E-Print Network [OSTI]

. Preventive maintenance durations and occurrences of main- tenance activities within the scheduling horizon by taking into account both the preventive maintenance durations and the occur- rences of maintenance of a system is often an opportunity to com- bine preventive and corrective maintenance. This is especially

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Gasbuggy Site Assessment and Risk Evaluation  

SciTech Connect (OSTI)

This report describes the geologic and hydrologic conditions and evaluates potential health risks to workers in the natural gas industry in the vicinity of the Gasbuggy, New Mexico, site, where the U.S. Atomic Energy Commission detonated an underground nuclear device in 1967. The 29-kiloton detonation took place 4,240 feet below ground surface and was designed to evaluate the use of a nuclear detonation to enhance natural gas production from the Pictured Cliffs Formation in the San Juan Basin, Rio Arriba County, New Mexico, on land administered by Carson National Forest. A site-specific conceptual model was developed based on current understanding of the hydrologic and geologic environment. This conceptual model was used for establishing plausible contaminant exposure scenarios, which were then evaluated for human health risk potential. The most mobile and, therefore, the most probable contaminant that could result in human exposure is tritium. Natural gas production wells were identified as having the greatest potential for bringing detonation-derived contaminants (tritium) to the ground surface in the form of tritiated produced water. Three exposure scenarios addressing potential contamination from gas wells were considered in the risk evaluation: a gas well worker during gas-well-drilling operations, a gas well worker performing routine maintenance, and a residential exposure. The residential exposure scenario was evaluated only for comparison; permanent residences on national forest lands at the Gasbuggy site are prohibited

None

2011-03-01T23:59:59.000Z

462

Linac cryogenic distribution system maintenance and upgrades at JLab  

SciTech Connect (OSTI)

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

Dixon, K.; Wright, M.; Ganni, V. [Thomas Jefferson National Accelerator Facility (JLab), Newport News, VA 23606 (United States)

2014-01-29T23:59:59.000Z

463

Linac cryogenic distribution system maintenance and upgrades at Jlab  

SciTech Connect (OSTI)

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

Dixon, Kelly D. [JLAB; Wright, Mathew C. [JLAB; Ganni, Venkatarao [JLAB

2014-01-01T23:59:59.000Z

464

Surface energy exchanges along a tundra-forest transition and feedbacks to climate  

E-Print Network [OSTI]

Surface energy exchanges along a tundra-forest transition and feedbacks to climate Jason Beringer a 21 October 2004; accepted 17 May 2005 Abstract Surface energy exchanges were measured in a sequence of five sites representing the major vegetation types in the transition from arctic tundra to forest

McGuire, A. David

465

Transition-fault test generation  

E-Print Network [OSTI]

. One way to detect these timing defects is to apply test patterns to the integrated circuit that are generated using the transition-fault model. Unfortunately, industry's current transition-fault test generation schemes produce test sets that are too...

Cobb, Bradley Douglas

2013-02-22T23:59:59.000Z

466

Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future  

SciTech Connect (OSTI)

The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs.

Vincent, J.R.

1990-09-01T23:59:59.000Z

467

Refrigerants in Transition  

E-Print Network [OSTI]

.E. Senior Engineer The Hartford Steam Boiler Inspection and Insurance Company Hartford,. Connecticut ABSTRACT The massive growth of air conditioning and refrigeration has been a direct result of the development of a class of chemicals called fluorocarbons..., Gordon, "Forty Years Research on Atmospheric Ozone at Oxford: A !Iistory," Applied Optics, March t968, pp. 387-405. 4. Downing, R., "Development of Chloro fluorocarbon Refrigerants," CFCs: Time of Transition, ASHRAE Publication, Atlanta, GA, 1989...

Stouppe, D. E.

468

Idaho National Laboratory Site Pollution Prevention Plan  

SciTech Connect (OSTI)

It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.

E. D. Sellers

2007-03-01T23:59:59.000Z

469

The energy transition Gerald Leach  

E-Print Network [OSTI]

The energy transition Gerald Leach The paper considers the substitution of tradition. The In the context of energy policy and planning, the paper concludes with a review of the reasons why transition. In the IS THE TRANSITION HAPPENING? poorest developing countries biomass fuels account for 60-95% of total energy use

Kammen, Daniel M.

470

Environmental Management Long-Term Stewardship Transition Guidance  

SciTech Connect (OSTI)

Long-term stewardship consists of those actions necessary to maintain and demonstrate continued protection of human health and the environment after the completion of facility cleanup. Long-term stewardship is administered and overseen by the U.S. Department of Energy Environmental Management Office of Science and Technology. This report describes the background of long-term stewardship and gives general guidance about considerations when ownership and/or responsibility of a site should be transferred to a long-term stewardship program. This guidance document will assist the U.S. Department of Energy in: (a) ensuring that the long-term stewardship program leads transition planning with respect to facility and site areas, and (b) describing the classes and types of criteria and data required to initiate transition for areas and sites where the facility mission has ended and cleanup is complete.

Kristofferson, Keith

2001-11-01T23:59:59.000Z

471

1999 Site Environmental Report  

SciTech Connect (OSTI)

The Site Environmental Report for Brookhaven National Laboratory for the calendar year 1999, as required by DOE Order 231.1.

NONE

2000-09-01T23:59:59.000Z

472

Nevada National Security Site  

Broader source: Energy.gov [DOE]

HISTORYIn 1950, President Truman established what is now known as the Nevada National Security Site (NNSS) to perform nuclear weapons testing activities.† In support of national defense initiatives...

473

2001 SITE ENVIRONMENTAL REPORT  

SciTech Connect (OSTI)

THE SITE ENVIRONMENTAL REPORT FOR BROOKHAVEN NATIONAL LABORATORY FOR THE CALENDAR YEAR 2001, AS REQUIRED BY DOE ORDER 231.1.

BROOKHAVEN NATIONAL LABORATORY

2002-09-01T23:59:59.000Z

474

Maintenance Awareness in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac J. Sreenan  

E-Print Network [OSTI]

Maintenance Awareness in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac J. Sreenan Mobile & Internet Systems Laboratory (MISL), University College Cork, Ireland Email: {a.barroso, u

Roedig, Utz

475

Maintenance Efficient Routing in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac Sreenan  

E-Print Network [OSTI]

Maintenance Efficient Routing in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac Sreenan Mobile & Internet Systems Laboratory, University College Cork, Ireland Email: {a.barroso u

Sreenan, Cormac J.

476

Chapter 51 Attainment and Maintenance of the National Ambient Air Quality Standards (Kentucky)  

Broader source: Energy.gov [DOE]

Kentucky Administrative Regulation Chapter 51, entitled Attainment and Maintenance of the National Ambient Air Quality Standards, is promulgated under the authority of the Division of Air Quality...

477

DOE Order Self Study Modules - DOE O 433.1B, Maintenance Management...  

Broader source: Energy.gov (indexed) [DOE]

for the following maintenance-related terms? Corrective Preventive Reliability-centered Note: If you think that you can complete the practice at the end of this...

478

E-Print Network 3.0 - activity maintenance study Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

results for: activity maintenance study Page: << < 1 2 3 4 5 > >> 1 Innovative Contracting Strategies forInnovative Contracting Strategies for Transportation...

479

E-Print Network 3.0 - aircraft maintenance workers Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mathematics 97 Rev. No.: 2.0 Contractor Environmental Safety and Health Manual Title: LockoutTagout Program Summary: worker performing the servicing or maintenance, is provided...

480

E-Print Network 3.0 - advanced integrated maintenance Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Abstract One of the major concerns of any maintenance Source: Basili, Victor R. - Fraunhofer Center & Department of Computer Science, University of Maryland at College Park...

Note: This page contains sample records for the topic "maintenance site transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

E-Print Network 3.0 - advanced maintenance technology Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Impact of RFID technologies on helicopter processes: Assessment on customer oriented Charlotte JIMENEZa,b Summary: maintenance process. Section 2 and 3 concentrate on the...

482

Microsoft Word - CX-Colville-Republic-Maintenance-FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

3 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFSF-Bell Proposed Action: Routine maintenance on the Colville-Republic...

483

E-Print Network 3.0 - aircraft maintenance personnel Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Learn about the critical factors involved Summary: , operation and maintenance of aging aircraft n Anyone involved in the field of aviation emergency response... .S. public...

484

Microsoft Word - CX-BigEddy-Redmond-ConductorMaintenance-FY13...  

Broader source: Energy.gov (indexed) [DOE]

4, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Stacy Hensley Project Manager - TEP-CSB-2 Proposed Action: Conductor maintenance on Bonneville Power...

485

Enterprise Assessments Review, Savannah River Site 2014 Site...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

More Documents & Publications Independent Oversight Inspection, Savannah River Site - January 2010 Independent Oversight Review, Savannah River Site Tritium Facilities - December...

486

Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Preliminary Evaluation Results  

SciTech Connect (OSTI)

This report provides an evaluation of three prototype fuel cell-powered transit buses operating at AC Transit in Oakland, California, and six baseline diesel buses similar in design to the fuel cell buses.

Chandler, K.; Eudy, L.

2007-03-01T23:59:59.000Z

487

Long-Term Surveillance and Maintenance Records: Maintaining Access to the Knowledge - 13122  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is an integral part of DOE's strategy to ensure that legacy liabilities of former nuclear weapons production sites are properly managed following the completion of environmental cleanup activities. In the area of environmental legacy management, records management is crucial to the protection of health, environmental, and legal interests of the Department and the public. LM is responsible for maintaining long-term surveillance and maintenance (LTS and M) records in performance of its mission. Maintaining access to the knowledge contained in these record collections is one of LM's primary responsibilities. To fulfill this responsibility, LM established a consolidated records management facility, the LM Business Center (LMBC), to house physical media records and electronic records. A new electronic record keeping system (ERKS) was needed to replace an obsolete system while helping to ensure LM is able to meet ongoing responsibilities to maintain access to knowledge and control the life cycle management of records. (authors)

Montgomery, John; Gueretta, Jeanie [U.S. Department of Energy Office of Legacy Management, 99 Research Park Road Morgantown, WV 26505 (United States)] [U.S. Department of Energy Office of Legacy Management, 99 Research Park Road Morgantown, WV 26505 (United States); McKinney, Ruth; Anglim, Cliff [Source One Management, Inc. (United States)] [Source One Management, Inc. (United States)

2013-07-01T23:59:59.000Z

488

Tribological Investigation of Mahua Oil Based Lubricant for Maintenance Applications  

E-Print Network [OSTI]

Limited crude reserves, consistently rising oil prices, unsafe disposal of the harmful lubricants and its guaranteed adverse aftereffects has increased concern for replenishing the environment. Development of environmental friendly lubricants and its appropriate usage is an option of prime importance which can overcome such problems. This paper investigates the prospects of Mahua oil based lubricant for maintenance applications. Mahua oil is blended with conventional gear oil (90T) in different ratios. Tribo pair used is plain carbon steel cylindrical pin and mild steel disc. Friction and wear parameters have been studied on Pin on Disc Tester under varying conditions. Worn out pins suggests pronounced abrasive and adhesive wear pattern under boundary film lubricated conditions. Experimentation reveals that addition of mahua oil blended with 90 T oil has good wear reducing traits apart from environmental benefits.

Amit Suhane; A. Rehman; H. K. Khaira

489

Feasibility study for a transportation operations system cask maintenance facility  

SciTech Connect (OSTI)

The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1991-01-01T23:59:59.000Z

490

Annual site environmental report for calendar year 1988  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1988 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,376 miles of transmission lines, 254 substations, and various appurtenant power facilities in the above geographic areas. Western also is responsible for planning, construction, and operation and maintenance of additional Federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service areas. Additionally, Western markets the US entitlement from the large Navajo coal-fired plant near Page, Arizona, and power generated at a wind farm in Wyoming. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

NONE

1988-12-31T23:59:59.000Z

491

Annual site environmental report for calendar year 1991  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1991 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,664 miles of transmission lines, 265 substations, and various appurtenant power facilities in fifteen central and western states. Western also is responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

NONE

1991-12-31T23:59:59.000Z

492

Site Energy Reduction Program  

E-Print Network [OSTI]

DuPontís Sabine River Works site is the largest energy consuming location within DuPont. In the year 2000, each production area was encouraged to reduce energy costs. By 2003 site energy consumption was down 16% on an absolute basis and 12% on a BTU...

Jagen, P. R.

2007-01-01T23:59:59.000Z

493

Protein active sites, interaction  

E-Print Network [OSTI]

for active site identification ! Manual MSA and structure analysis ! Catalytic Site Atlas (homology-based) ! Evolutionary Trace (MSA subfamily- and family-wide conservation; phylogenetic tree and structure analysis) ! 3D", Bartlett et al. J Mol Biol. 2002 Nov 15;324(1):105-21. · "An evolutionary trace method defines binding

Sjölander, Kimmen

494

Meteorological Observations for Renewable Energy Applications at Site 300  

SciTech Connect (OSTI)

In early October 2010, two Laser and Detection Ranging (LIDAR) units (LIDAR-96 and LIDAR-97), a 3 m tall flux tower, and a 3 m tall meteorological tower were installed in the northern section of Site 300 (Figure 1) as a first step in development of a renewable energy testbed facility. This section of the SMS project is aimed at supporting that effort with continuous maintenance of atmospheric monitoring instruments capable of measuring vertical profiles of wind speed and wind direction at heights encountered by future wind power turbines. In addition, fluxes of energy are monitored to estimate atmospheric mixing and its effects on wind flow properties at turbine rotor disk heights. Together, these measurements are critical for providing an accurate wind resource characterization and for validating LLNL atmospheric prediction codes for future renewable energy projects at Site 300. Accurate, high-resolution meteorological measurements of wind flow in the planetary boundary layer (PBL) and surface-atmosphere energy exchange are required for understanding the properties and quality of available wind power at Site 300. Wind speeds at heights found in a typical wind turbine rotor disk ({approx} 40-140 m) are driven by the synergistic impacts of atmospheric stability, orography, and land-surface characteristics on the mean wind flow in the PBL and related turbulence structures. This section of the report details the maintenance and labor required in FY11 to optimize the meteorological instruments and ensure high accuracy of their measurements. A detailed look at the observations from FY11 is also presented. This portion of the project met the following milestones: Milestone 1: successful maintenance and data collection of LIDAR and flux tower instruments; Milestone 2: successful installation of solar power for the LIDAR units; and Milestone 3: successful implementation of remote data transmission for the LIDAR units.

Wharton, S; Alai, M; Myers, K

2011-10-26T23:59:59.000Z

495

Hanford Site air operating permit application  

SciTech Connect (OSTI)

The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

NONE

1995-05-01T23:59:59.000Z

496

Savannah River Site's Site Specific Plan  

SciTech Connect (OSTI)

This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

Not Available

1991-08-01T23:59:59.000Z

497

Site decommissioning management plan  

SciTech Connect (OSTI)

The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff`s strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites.

Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

1993-10-01T23:59:59.000Z

498

Preliminary Site Characterization Report, Rulsion Site, Colorado  

SciTech Connect (OSTI)

This report is a summary of environmental information gathered during a review of the documents pertaining to Project Rulison and interviews with personnel who worked on the project. Project Rulison was part of Operation Plowshare (a program designed to explore peaceful uses for nuclear devices). The project consisted of detonating a 43-kiloton nuclear device on September 10, 1969, in western Colorado to stimulate natural gas production. Following the detonation, a reentry well was drilled and several gas production tests were conducted. The reentry well was shut-in after the last gas production test and was held in standby condition until the general cleanup was undertaken in 1972. A final cleanup was conducted after the emplacement and testing wells were plugged in 1976. However, some surface radiologic contamination resulted from decontamination of the drilling equipment and fallout from the gas flaring during drilling operations. With the exception of the drilling effluent pond, all surface contamination at the Rulison Site was removed during the cleanup operations. All mudpits and other excavations were backfilled, and both upper and lower drilling pads were leveled and dressed. This report provides information regarding known or suspected areas of contamination, previous cleanup activities, analytical results, a review of the regulatory status, the site`s physical environment, and future recommendations for Project Ruhson. Based on this research, several potential areas of contamination have been identified. These include the drilling effluent pond and mudpits used during drilling operations. In addition, contamination could migrate in the gas horizon.

NONE

1996-08-01T23:59:59.000Z

499

Transition Metal Switchable Mirror  

ScienceCinema (OSTI)

The switchable-mirrors technology was developed by Tom Richardson and Jonathan Slack of Berkeley Lab's Environmental Energy Technologies Division. By using transition metals rather than the rare earth metals used in the first metal-hydride switchable mirrors, Richardson and Slack were able to lower the cost and simplify the manufacturing process. Energy performance is improved as well, because the new windows can reflect or transmit both visible and infrared light. Besides windows for offices and homes, possible applications include automobile sunroofs, signs and displays, aircraft windows, and spacecraft. More information at: http://windows.lbl.gov/materials/chromogenics/default.htm

None

2013-05-29T23:59:59.000Z

500

Transition Metal Switchable Mirror  

ScienceCinema (OSTI)

The switchable-mirrors technology was developed by Tom Richardson and Jonathan Slack of Berkeley Lab's Environmental Energy Technologies Division. By using transition metals rather than the rare earth metals used in the first metal-hydride switchable mirrors, Richardson and Slack were able to lower the cost and simplify the manufacturing process. Energy performance is improved as well, because the new windows can reflect or transmit both visible and infrared light. Besides windows for offices and homes, possible applications include automobile sunroofs, signs and displays, aircraft windows, and spacecraft.

None

2010-01-08T23:59:59.000Z