Sample records for maintenance repair shop

  1. Automotive Repair Shops Case Study ME 4171 Automotive Repair Shops

    E-Print Network [OSTI]

    shops use a wide range of equipment, chemicals, and raw materials. Available services include welding generated through welding? To repair both minor and major auto body damage, hydraulic equipment and hand are recycled with other waste oil generated on site. Question: 2) Do you expect the equipment oil

  2. Incremental temporal reasoning in job shop scheduling repair

    E-Print Network [OSTI]

    Huang, Y.

    A working predictive schedule can be useless because of the various external or internal disruptions in a job shop. Total rescheduling may cause problems such as shop floor nervousness. Thus, the job shop scheduling repair ...

  3. Exposure Evaluation for Benzene, Lead and Noise in Vehicle and Equipment Repair Shops

    SciTech Connect (OSTI)

    Sweeney, Lynn C.

    2013-04-10T23:59:59.000Z

    An exposure assessment was performed at the equipment and vehicle maintenance repair shops operating at the U. S. Department of Energy Hanford site, in Richland, Washington. The maintenance shops repair and maintain vehicles and equipment used in support of the Hanford cleanup mission. There are three general mechanic shops and one auto body repair shop. The mechanics work on heavy equipment used in construction, cranes, commercial motor vehicles, passenger-type vehicles in addition to air compressors, generators, and farm equipment. Services include part fabrication, installation of equipment, repair and maintenance work in the engine compartment, and tire and brake services. Work performed at the auto body shop includes painting and surface preparation which involves applying body filler and sanding. 8-hour time-weighted-average samples were collected for benzene and noise exposure and task-based samples were collected for lead dust work activities involving painted metal surfaces. Benzene samples were obtained using 3M™ 3520 sampling badges and were analyzed for additional volatile organic compounds. These compounds were selected based on material safety data sheet information for the aerosol products used by the mechanics for each day of sampling. The compounds included acetone, ethyl ether, toluene, xylene, VM&P naphtha, methyl ethyl ketone, and trichloroethylene. Laboratory data for benzene, VM&P naphtha, methyl ethyl ketone and trichloroethylene were all below the reporting detection limit. Airborne concentrations for acetone, ethyl ether, toluene and xylene were all less than 10% of their occupational exposure limit. The task-based samples obtained for lead dusts were submitted for a metal scan analysis to identify other metals that might be present. Laboratory results for lead dusts were all below the reporting detection limit and airborne concentration for the other metals observed in the samples were less than 10% of the occupational exposure limit. Noise dosimetry sampling was performed on a random basis and was representative of the different work activities within the four shops. Twenty three percent of the noise samples exceeded the occupational exposure limit of 85 decibels for an 8-hour time-weightedaverage. Work activities where noise levels were higher included use of impact wrenches and grinding wheels.

  4. E-Print Network 3.0 - automobile repair shops Sample Search Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Search Powered by Explorit Topic List Advanced Search Sample search results for: automobile repair shops Page: << < 1 2 3 4 5 > >> 1 Program Director: Jim Headlee Phone:...

  5. Building 9401-2 Plating Shop Surveillance and Maintenance Plan

    SciTech Connect (OSTI)

    None

    1999-05-01T23:59:59.000Z

    This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure that Building 9401-2 Plating Shop is maintained in a cost effective and environmentally secure configuration until subsequent closure during the final disposition phase of decommissioning. U.S. Department of Energy (DOE) G430.1A-2, Surveillance and Maintenance During Facility Disposition (1997), was used as guidance in the development of this plan. The S and M Plan incorporates DOE O 430.1A, Life Cycle Asset Management (LCAM) (1998a) direction to provide for conducting surveillance and maintenance activities required to maintain the facility and remaining hazardous and radioactive materials, wastes, and contamination in a stable and known condition pending facility disposition. Recommendations in the S and M plan have been made that may not be requirement-based but would reduce the cost and frequency of surveillance and maintenance activities. During the course of S and M activities, the facility's condition may change so as to present an immediate or developing hazard or unsatisfactory condition. Corrective action should be coordinated with the appropriate support organizations using the requirements and guidance stated in procedure Y10-202, Rev. 1, Integrated Safety Management Program, (Lockheed Martin Energy Systems, Inc. (LMES), 1998a) implemented at the Oak Ridge Y-12 Plant and the methodology of the Nuclear Operations Conduct of Operations Manual (LMES, 1999) for the Depleted Uranium Operations (DUO) organization. The key S and M objectives applicable to the Plating Shop are to: Ensure adequate containment of remaining residual material in exhaust stacks and outside process piping, stored chemicals awaiting offsite shipment, and items located in the Radioactive Material Area (RMA); Provide access control into the facility and physical safety to S and M personnel; Maintain the facility in a manner that will protect the public, the environment, and the S and M personnel; Provide an S and M plan which identifies and complies with applicable environmental, safety, and health safeguards and security requirements; and Provide a cost effective S and M program for the plating shop, Building 9401-2.

  6. Mathematical optimization of a flexible job shop problem including preventive maintenance and

    E-Print Network [OSTI]

    Patriksson, Michael

    1 Mathematical optimization of a flexible job shop problem including preventive maintenance as the scheduling problem includes limited availability of fixtures and preventive maintenance planning periodicity, a number of preventive maintenance activities need to be carried out in some of the resources

  7. Home Maintenance and Repair Owning a home is a major responsibility.

    E-Print Network [OSTI]

    maintenance is conducted. Regular, preventive maintenance can pay off in peace of mind, utility cost savings, routine maintenance helps to prolong the life of the home and may prevent the need for major repairs of Benjamin Franklin, "An ounce of prevention is worth a pound of cure." Regular, routine maintenance enhances

  8. Associate Vice Chancellor Maintenance

    E-Print Network [OSTI]

    Hartman, Chris

    Engineering Capital Planning & Design Carpentry Shop Electrical Shop Plumbing Shop HVAC Shop Housing Shop Equipment & Vehicle Maintenance Warehouse Vehicle Pool Shuttle Post Office Parking Services Contract Management Water Distribution Heat & Power Generation Heat Distribution Power Distribution December 2012

  9. FOR EMERGENCY CABIN REPAIRS REPORT ITFOR EMERGENCY CABIN REPAIRS REPORT IT IMMEDIATELYIMMEDIATELY TO THE MAINTENANCE SHOP OR ONE OFTO THE MAINTENANCE SHOP OR ONE OF

    E-Print Network [OSTI]

    Minnesota, University of

    & EMPTY GARBAGE INTO TRASH BINS LOCATED OUTSIDE.LOCATED OUTSIDE. RECYCLE BINS ARE ACROSS FROMRECYCLE BINS IF NOT SURE! NO PETS ARE ALLOWED ON THE STATION!NO PETS ARE ALLOWED ON THE STATION! CAMPFIRES MAY BE BUILT

  10. Scheduling predictive maintenance in flow-shop Christophe Varnier, Noureddine Zerhouni

    E-Print Network [OSTI]

    Boyer, Edmond

    . Predictive maintenance is an answer to prevent equipment from risk of breakdowns while minimizing, for each machine, the control mode and if necessary the preventive maintenance plan. I. INTRODUCTION to prevent equipment from risk of breakdowns while minimizing the maintenance costs. Nevertheless, conflicts

  11. Simple Maintenance Saves Costly Furnace Repair/Replacement |...

    Broader source: Energy.gov (indexed) [DOE]

    furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the...

  12. Steam turbine maintenance and repair technology: Reducing planned-outage costs

    SciTech Connect (OSTI)

    Grace, H.P.; McClintock, M. (General Physics Corp., Columbia, MD (USA)); Lamping, G. (Southwest Research Inst., San Antonio, TX (USA))

    1990-04-01T23:59:59.000Z

    The North American Electric Reliability Council (NAERC) reported that the average loss of equivalent availability per outage for a major fossil turbine overhaul is 323,000 MW-HR. The Electric Power Research Institute (EPRI) Generation and Storage Division, is in the first phase of a major research project to reduce the duration and/or frequency of steam turbine maintenance outages. This project consists of an assessment of the current state-of-the-art turbine maintenance and repair techniques and technologies. It is based on a review of current turbine maintenance practices of the US, European, Japanese, and Australian utility industries. Emphasized are maintenance and repair activities that have the most significant impact on outage duration or frequency. Twenty-six key turbine maintenance activities and the current best techniques were identified for use by utility maintenance personnel. Overall outage durations could be reduced if the duration of these activities were shortened or if they were performed more effectively. Recommended projects for development of advanced steam turbine maintenance technology were identified. 29 refs., 46 figs., 9 tabs.

  13. Designer's guidebook for first wall/blanket/shield assembly, maintenance, and repair

    SciTech Connect (OSTI)

    Not Available

    1983-12-30T23:59:59.000Z

    This is the initial issue of the guidebook. Since a guidebook of this type must incorporate information concerning a wide range of subjects, much additional data will eventually be included. The guidebook will document, in summary and easily referenceable form, data, designs, design concepts, design guidelines and background information useful to the FWBS and to the Maintenance System designer. In providing guidelines for the AMR of the FWBS, the guidebook must, of necessity, include guidelines for all aspects of maintenance associated with the FWBS. These include most maintenance operations within the reactor room necessary to gain access, identify faults, and handle equipment related to FWBS maintenance. In addition, the guidelines include those required to define facility requirements for handling and repair of FWBS and related reactor components external to the reactor room. Particular emphasis is given to remote maintenance design and operations.

  14. Review of Maintenance and Repair Times for Components in Technological Facilities

    SciTech Connect (OSTI)

    L. C. Cadwallader

    2012-11-01T23:59:59.000Z

    This report is a compilation of some unique component repair time data and it also presents citations of more extensive reports where lists of repair times can be found. This collection of information should support analysts who seek to quantify maintainability and availability of high technology and nuclear energy production systems. While there are newer sources of repair time information, most, if not all, of the newer sources are proprietary and cannot be shared. This report offers data that, while older, is openly accessible and can serve as reasonable estimates of repair times, at least for initial studies. Some times were found for maintenance times in radiation environments, and some guidance for multiplicative factors to use to account for work in contamination areas.

  15. Subj: Educational and General (E&G) Facility Support Provide an overview of Facility Operations, Maintenance, Repair and Renovation and Space

    E-Print Network [OSTI]

    support, and, preventive and unscheduled maintenance of all building systems, with the exception of BAS Operations, Maintenance, Repair and Renovation and Space Management Procedures and Practices. KEY DEFINITIONS chambers, fume hoods, fixed seating, etc. are normally considered part of the building. Maintenance, repair

  16. Maintenance Types

    Broader source: Energy.gov [DOE]

    Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the...

  17. Condition-based maintenance under an imperfect repair policy for a deteriorating production system

    E-Print Network [OSTI]

    Boyer, Edmond

    is periodically monitored. Imperfect preventive maintenance activities, which restore the production system policy, both linear and non-linear imperfect preventive maintenance cost functions are investigated preventive maintenance (or preventive replacement) is usually used. After each preventive maintenance action

  18. Ted B shop, PGA Derek Sprague, PGA

    E-Print Network [OSTI]

    Hemmers, Oliver

    and Superintendent to review operations/maintenance procedures, Model Golf Shop application. NOON a Evaluation team 451001 Las Vegas, NV 89154-1001 Dear President Smatresk: The Criteria and Standards for Accreditation and procedures ofthe program (policies and procedures for the golf course and golf shop should also be included

  19. Exemption from Application of the Service Contract Act -Certification UT-B Contracts Div Maintenance, Calibration, or Repair of Certain Equipment

    E-Print Network [OSTI]

    Pennycook, Steve

    Exemption from Application of the Service Contract Act - Certification UT-B Contracts Div-sca-equip-certification-ext-venx-mar09.doc EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT ACT ­ MAINTENANCE, CALIBRATION, OR REPAIR to the conditions in paragraph (a) of this provision, and the Company determines that the Service Contract Act ­ (1

  20. Exemption from Application of the Service Contract Act -Requirements UT-B Contracts Div Maintenance, Calibration, or Repair of Certain Equipment

    E-Print Network [OSTI]

    Pennycook, Steve

    Exemption from Application of the Service Contract Act - Requirements UT-B Contracts Div-sca-equip-requirement-ext-jan08.doc EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT ACT ­ MAINTENANCE, CALIBRATION, OR REPAIR inapplicable, and the Agreement shall become subject to the Service Contract Act. In such case, the procedures

  1. Millikelvin Lab Machine Shop

    E-Print Network [OSTI]

    McQuade, D. Tyler

    Millikelvin Lab OP105­112 Machine Shop OP132 Resistive Magnet Shop CICC Winding Area Transformers This building is home to the Millikelvin lab, the control room, the resistive magnet and machine shops, the CICC@magnet.fsu.edu (850) 644-4378 (850) 644-0534 2 MACHINE SHOP OP132 Vaughan Williams (A114*) williams

  2. An exploration of tourist shopping

    E-Print Network [OSTI]

    Oh, Yoon-Jung

    2009-05-15T23:59:59.000Z

    -demographic variables (age, education and income) on tourists’ shopping expenditures. Based on previous research in leisure/tourism and consumer studies on shopping, a conceptual framework of tourist shopping was proposed for this study. For the purpose of this study...

  3. The urban coffee shop

    E-Print Network [OSTI]

    Chadios, Konstantinos

    2005-01-01T23:59:59.000Z

    This thesis is an investigation of the role of the coffee shop in the urban environment throughout history. Coffee shops spread from the Arab world to Europe and then to the U.S. at the end of the seventeenth century. ...

  4. Rapid road repair vehicle

    DOE Patents [OSTI]

    Mara, Leo M. (Livermore, CA)

    1998-01-01T23:59:59.000Z

    Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find an the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was was heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past.

  5. Machine Shop Safety Tips & Safety Guidelines GENERAL SAFETY TIPS

    E-Print Network [OSTI]

    Veiga, Pedro Manuel Barbosa

    Machine Shop Safety Tips & Safety Guidelines GENERAL SAFETY TIPS · Safety glasses with side shields distance away from moving machine parts, work pieces, and cutters. · Use hand tools for their designed to oil, clean, adjust, or repair any machine while it is running. Stop the machine and lock the power

  6. Asphalt, Concrete, and Turf Maintenance and Preservation

    E-Print Network [OSTI]

    Minnesota, University of

    preventive maintenance, pavement distress and identification, and best practices for the maintenance Consultant WSB and Associates, Inc. 763-287-7184 jstewart@wsbeng.com #12;2 Preventive Maintenance Preventive maintenance and minor rehab, and is often used to repair environmental damage. Preventive maintenance narrows

  7. Performance evaluation of centralized maintenance workshop by using Queuing Networks

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    maintenance types: Preventive maintenance: different actions are programmed in cycle periods; CorrectivePerformance evaluation of centralized maintenance workshop by using Queuing Networks Zineb Simeu: Maintenance workshop integrated in the job-shop system is required in order to maintain the production

  8. Optimization Online - Optimizing Preventive Maintenance Models

    E-Print Network [OSTI]

    Michael Bartholomew-Biggs

    2004-06-29T23:59:59.000Z

    Jun 29, 2004 ... Abstract: We deal with the problem of scheduling preventive maintenance (PM) by minimizing a performance function which reflects repair and ...

  9. APS LOM Shop Usage

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies |November 2011Astudies ColoradoTechnical1 NationalC5LOM Shop

  10. Preventative Maintenance (PM) Policy Outline the policy regarding preventative vehicle maintenance on University of Michigan (U-

    E-Print Network [OSTI]

    Kirschner, Denise

    Preventative Maintenance (PM) Policy Objective Outline the policy regarding preventative vehicle maintenance on University of Michigan (U- M) vehicles. Policy 1. All maintenance performed on U-M vehicles their own campus maintenance facility to repair their fleet vehicles. 2. To ensure proper stewardship of U

  11. Vehicle Maintenance Policy Outline the policy regarding vehicle maintenance at University of Michigan (U-M).

    E-Print Network [OSTI]

    Kirschner, Denise

    Vehicle Maintenance Policy Objective Outline the policy regarding vehicle maintenance at University of Michigan (U-M). Policy 1. All maintenance performed on U-M vehicles must be coordinated through Garage to repair their fleet vehicles. 2. U-M vehicles leased through Fleet Services include routine maintenance

  12. Quality electric motor repair: A guidebook for electric utilities

    SciTech Connect (OSTI)

    Schueler, V.; Douglass, J.

    1995-08-01T23:59:59.000Z

    This guidebook provides utilities with a resource for better understanding and developing their roles in relation to electric motor repair shops and the industrial and commercial utility customers that use them. The guidebook includes information and tools that utilities can use to raise the quality of electric motor repair practices in their service territories.

  13. Job-Shop Scheduling in a Body Shop

    E-Print Network [OSTI]

    2012-10-20T23:59:59.000Z

    ing in a car body production line, where possible colli- sions between industrial robots have to be taken into ac- count. BSSP corresponds to a job-shop problem

  14. Flow shop scheduling with peak power consumption constraints

    E-Print Network [OSTI]

    K. Fang

    2012-03-29T23:59:59.000Z

    Mar 29, 2012 ... Flow shop scheduling with peak power consumption constraints ... Keywords: scheduling, flow shop, energy, peak power consumption, integer ...

  15. University of California at Berkeley Shop Safety Policy Biomolecular Nanotechnology Center Machine Shop

    E-Print Network [OSTI]

    Healy, Kevin Edward

    by the manufacturer and within the equipment's Nationally Recognized Testing Laboratory (NRTL) listing. · All shop

  16. HEP Division Staff Shop Policy INTRODUCTION

    E-Print Network [OSTI]

    Kemner, Ken

    the findings to the Shop Custodian in a written or verbal form. Immediately upon the lockout/tagout of any

  17. Rotating equipment shop testing

    SciTech Connect (OSTI)

    Godse, A.G. (Kuwait National Petroleum Co., Shuaiba (KW))

    1990-01-01T23:59:59.000Z

    Poor performance of machinery after commissioning at first draws comments on whether the purchase specification was in order, whether there were any lapses in stage inspection or whether the performance test procedure was inadequate. Attempts are initiated to find out whether there were any deviations in operating conditions from the purchase specifications, inadvertent lapses in operation or any mistakes by the maintenance Dept. It will be of some interest to mention here a difference between operating companies who have taken over existing plants and engineering consulting companies who have engineered and constructed the plants. The specialist rotating machinery group of engineering consultant companies have a good understanding of what can be achieved at the manufacturer's test facility due to repeated dealings with manufacturers. However, operating company understanding varies from one organization to the next. This article gives an overview of rotating machinery with respect to test objectives and field problems.

  18. Reactive Maintenance

    Broader source: Energy.gov [DOE]

    Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities.

  19. Inspection & Maintenance

    E-Print Network [OSTI]

    vehicles they own or control: 1. Preventative maintenance/safety inspections at least every 3 to 6 months provides a Preventive Maintenance Check List for guidance and scheduling. 2. If a vehicle is under warranty, Fleet Services will ensure the vehicle has at least the normal preventative, scheduled maintenance

  20. Awarded Products Maintenance, Repair & Operations TOOLS & HARDWARE

    E-Print Network [OSTI]

    Tsien, Roger Y.

    Products HVAC, pumps & compressors, plumbing suppliers, paint, oil and lubricants, lumber & carpentry, rigging supplies HVAC, pumps & compressors, plumbing suppliers, paint, oil and lubricants, lumber, paint, oil and lubricants, lumber & carpentry, rigging supplies Specialty Lighting A division of CED

  1. Repair and Replacement projects help FM to honor its commitment to

    E-Print Network [OSTI]

    Gulliver, Robert

    of the University. Services provided fall into three major categories: preventive maintenance, routine repairs friendly power. Energy Management is continually recognized for the superior maintenance. · Maintenance (www.facm.umn. edu/services/maintenance.html) Maintenance Operations preserves the physical assets

  2. Shop Request - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearchScheduled System OutagesNewsMaterialsX-rayOur StaffShop Request

  3. Modelling of dependence between critical failure and preventive maintenance

    E-Print Network [OSTI]

    Langseth, Helge

    Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect that the failure can be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

  4. Modelling of dependence between critical failure and preventive maintenance

    E-Print Network [OSTI]

    Langseth, Helge

    Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

  5. Toolbox Safety Talk Machine Shop Safety

    E-Print Network [OSTI]

    Pawlowski, Wojtek

    Toolbox Safety Talk Machine Shop Safety Environmental Health & Safety Facilities Safety & Health to Environmental Health & Safety for recordkeeping. Machine shops are an integral part of the Cornell University be taken seriously. Many of the most frequently cited OSHA safety standards pertain to machine safeguarding

  6. Predictive Maintenance

    Broader source: Energy.gov [DOE]

    Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration.

  7. Preventive Maintenance

    Broader source: Energy.gov [DOE]

    Preventive maintenance aims to sustain and/or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time.

  8. Communications in Statistics-Stochastic Models, 16(1), 121-142 (2000) 1 BAYESIAN MAINTENANCE POLICIES DURING A

    E-Print Network [OSTI]

    Popova, Elmira

    of maintenance policies which consist of minimal repair and preventive maintenance is analyzed for the case preventive maintenance can reduce the age of the machine by x units. Under a constant maintenance costCommunications in Statistics-Stochastic Models, 16(1), 121-142 (2000) 1 BAYESIAN MAINTENANCE

  9. Heavy Mobile Equipment Mechanic (One Mechanic Shop)

    Broader source: Energy.gov [DOE]

    The position is a Heavy Mobile Equipment Mechanic (One Mechanic Shop) located in Kent, Washington, and will be responsible for the safe and efficient operation of a field garage performing...

  10. Reliability-Centered Maintenance

    Broader source: Energy.gov [DOE]

    Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

  11. Biomass Company Sets Up Shop in High School Lab | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Biomass Company Sets Up Shop in High School Lab Biomass Company Sets Up Shop in High School Lab March 30, 2010 - 2:45pm Addthis Stephen Graff Former Writer & editor for Energy...

  12. STANDARD OPERATING PROCEDURES Sampler Maintenance by Site Operators

    E-Print Network [OSTI]

    Fischer, Emily V.

    IMPROVE STANDARD OPERATING PROCEDURES SOP 201 Sampler Maintenance by Site Operators Date Last.0 PURPOSE AND APPLICABILITY This standard operating procedure (SOP) describes the procedures and schedules. The procedural steps for weekly maintenance and repairs performed by the site operator are included in TI 201A

  13. Quality assurance in small plating shops

    SciTech Connect (OSTI)

    McNabb, W.J. (Electroless Nickel Plating of Louisiana, Hammond, LA (United States))

    1993-10-01T23:59:59.000Z

    The potential for electroless nickel coatings in oilfield and petrochemical applications is quite high. The greatest obstacle to their use has been a reputation for poor quality due to a lack of quality control in many plating shops. To overcome this, electroless nickel shops should not only have a quality control program in their operation, but must also document its use and success. This article describes how a plating shoe can develop the necessary procedures, manuals, and paperwork trail to offer quality assurance and to satisfy customers.

  14. 304 IEEE TRANSACTIONS ON RELIABILITY, VOL. 54, NO. 2, JUNE 2005 Integrating Preventive Maintenance Planning and

    E-Print Network [OSTI]

    Kutanoglu, Erhan

    304 IEEE TRANSACTIONS ON RELIABILITY, VOL. 54, NO. 2, JUNE 2005 Integrating Preventive Maintenance & Conclusions--Preventive maintenance planning, and production scheduling are two activities that are inter-depen- dent but most often performed independently. Considering that preventive maintenance, and repair affect

  15. Home Maintenance Manual.

    E-Print Network [OSTI]

    Anonymous,

    1985-01-01T23:59:59.000Z

    they become serious. The accompanying home maintenance plan is one way of setting up a regular inspection program. The checklist suggests maintenance and the best time to inspect. Revise or add to this checklist to meet your needs. HOME MAINTENANCE...

  16. Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future

    SciTech Connect (OSTI)

    Vincent, J.R.

    1990-09-01T23:59:59.000Z

    The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs.

  17. Flow Shop Scheduling with Peak Power Consumption Constraints

    E-Print Network [OSTI]

    2012-09-23T23:59:59.000Z

    To conduct our experiments, we considered a hypothetical flow shop scheduling ... There are two types of machines with different operations: face milling. 16 ...

  18. Hybrid heuristics for the permutation flow shop problem

    E-Print Network [OSTI]

    Martin G. Ravetti

    2006-11-05T23:59:59.000Z

    Nov 5, 2006 ... Hybrid heuristics for the permutation flow shop problem. Martin G. Ravetti (martin ***at*** dcc.ufmg.br) Fabiola G. Nakamura (fgnaka ***at*** ...

  19. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    efficiency. The shop, designated 254E, has improved transformer testing, repair and maintenance capabilities. Currently, MSA is preparing to dispose of approximately 70...

  20. Designing a scrubber for maintenance

    SciTech Connect (OSTI)

    Mahlmeister, M.E.; Baron, E.S. [New York State Electric and Gas Corp., Binghamton, NY (United States); Watts, J. [USDOE Pittsburgh Energy Technology Center, PA (United States)

    1996-12-01T23:59:59.000Z

    Under Round 4 of the U.S. Department of Energy`s (DOE) Clean Coal Technology program, New York State Electric & Gas Corporation (NYSEG), in partnership with Saarberg-Holter-Umwelttechnik (SHU), Consolidation Coal Company and Stebbins Engineering and Manufacturing Company, has retrofitted a formic acid enhanced forced oxidation wet limestone scrubber on Units I and 2 at the Milliken Steam Electric Station. Units I and 2 are 1950s vintage Combustion Engineering tangentially fired pulverized coal units, which are rated at nominal 150 MW each and operate in balanced draft mode. The Flue Gas Desulfurization (FGD) system for Unit 2 was placed into operation in January 1995 and the Unit I system in June 1995. The project incorporates several unique aspects: low pH operation; a ceramic tile-lined cocurrent/countercurrent, split module absorber; a wet stack supported on the roof of the FGD building; and closed loop, zero liquid discharge operation that produces commercial grade gypsum and calcium chloride brine. The project objectives include 98% SO{sub 2} removal efficiency while burning high sulfur coal, the production of marketable byproducts to minimize solid waste disposal, zero wastewater discharge, space-saving design, and minimization of maintenance requirements of a wet scrubber. The paper provides a brief overview of the project scrubber design relating to maintenance considerations. A discussion of the early results of the maintenance history is also provided. Repair techniques that have been developed and tested for ceramic tile lined modules are included. 1 fig.

  1. Predictive Maintenance Technologies

    Broader source: Energy.gov [DOE]

    Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs.

  2. Tips: Shopping for Lighting | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler Tina Butler Tina-Butler.jpgLighting Tips: Shopping for

  3. ENERGY STAR Back-To-School Shopping Checklist

    E-Print Network [OSTI]

    ENERGY STAR® Back-To-School Shopping Checklist Students can make a difference by shopping "smart" with ENERGY STAR® . Computing the Savings ENERGY STAR Qualified Computer Equipment Computer Monitor ENERGY up to 90 percent more energy than standard monitors. Printer If every home office were powered

  4. A Cooperative Approach for Job Shop Scheduling under Uncertainties

    E-Print Network [OSTI]

    Briand, Cyril

    control, consists to use a two-level resolution scheme: an off-line scheduling level builds upA Cooperative Approach for Job Shop Scheduling under Uncertainties C. BRIANDa,1 , S. OURARIb and B on job shop scheduling problems in a cooperative environment. Unlike classical deterministic approaches

  5. Intelligent pothole repair vehicle

    E-Print Network [OSTI]

    Minocher Homji, Ruzbeh Adi

    2006-10-30T23:59:59.000Z

    This thesis presents an endeavor to design and construct a prototype of an automated road repair vehicle called the Intelligent Pothole Repair Vehicle (IPRV). The IPRV is capable of automatically detecting and filling potholes on road surfaces...

  6. Computerized Maintenance Management Systems

    Broader source: Energy.gov [DOE]

    Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

  7. Optimizing Preventive Maintenance Models

    E-Print Network [OSTI]

    Optimizing Preventive Maintenance Models. Michael Bartholomew-Biggs. School of Physics Astronomy and Mathematics, University of Hertfordshire.

  8. HFIR Plant Maintenance - August

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    connections are nearly complete: -Vacuum system: Major leaks have been repaired, second turbo pump connection complete -RF Helicon system: New water-cooled antenna connection...

  9. Electric vehicle repairs and modifications

    SciTech Connect (OSTI)

    Buffett, R.K.

    1982-11-01T23:59:59.000Z

    This informal report describes the electric vehicle (EV) inspection and the necessary maintenance and repairs required to improve reliable operation of five Volkswagen (VW) Electrotransporter vans and five VW EV buses. The recommendations of TVA, EPRI, GES, Volkswagen, Siemens, and Hoppecke have been carried out in this effort. These modifications were necessary before entering the EPRI/TVA phase II and III continuing program. As new energy storage systems are explored using the VW test-bed vehicles in the battery field testing program, additional modifications may be required. All modifications will be submitted to the vehicle and component manufacturer for general assessment and recommendations. At present three different types of battery systems are being evaluated in six VW vehicles. The two Hoppecke and Exide utilize the modified Hoppecke charging systems. The other batteries being tested require off-board chargers specified by their manufacturer and are separate from the vehicle system.

  10. DIESEL/HEAVY The diesel/heavy equipment certificate offers training in maintenance

    E-Print Network [OSTI]

    Ickert-Bond, Steffi

    DIESEL/HEAVY EQUIPMENT The diesel/heavy equipment certificate offers training in maintenance and repair of heavy equipment and trucks. Students will learn to work on electrical and air systems, diesel · Small Engines · Automotive Maintenance · Welding · Training for entry level heavy diesel equipment

  11. No maintenance -- no energy efficiency

    SciTech Connect (OSTI)

    Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

    1994-12-01T23:59:59.000Z

    Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

  12. Draft of new maintenance standards for LWR in Japan

    SciTech Connect (OSTI)

    Iida, Kunihiro [Shibaura Inst. of Tech., Tokyo (Japan). Dept. of Mechanical Engineering

    1996-12-01T23:59:59.000Z

    Activities of development of new maintenance standards for operating nuclear power plant in Japan are described. The work of drafting the standards has been done by the Committee of Nuclear Plant Operation and Maintenance Standards (POMS), that was organized in the Japan Power Engineering and Inspection Corporation under the entrustment from the Ministry of International Trade and Industry. The articles of ASME Section XI related to inspection, flaw evaluation and repair have been examined and modified, if necessary, so as to introduce latest Japanese database and technological knowledge. In the area of repairs, many repair techniques verified in recent years in Japan were incorporated i n addition to those specified in ASME Section XI. Finally major differences between ASME Section XI and the draft of the standards are listed.

  13. Repair of overheating linear accelerator

    SciTech Connect (OSTI)

    Barkley, Walter; Baldwin, William; Bennett, Gloria; Bitteker, Leo; Borden, Michael; Casados, Jeff; Fitzgerald, Daniel; Gorman, Fred; Johnson, Kenneth; Kurennoy, Sergey; Martinez, Alberto; O’Hara, James; Perez, Edward; Roller, Brandon; Rybarcyk, Lawrence; Stark, Peter; Stockton, Jerry

    2004-01-01T23:59:59.000Z

    Los Alamos Neutron Science Center (LANSCE) is a proton accelerator that produces high energy particle beams for experiments. These beams include neutrons and protons for diverse uses including radiography, isotope production, small feature study, lattice vibrations and material science. The Drift Tube Linear Accelerator (DTL) is the first portion of a half mile long linear section of accelerator that raises the beam energy from 750 keV to 100 MeV. In its 31st year of operation (2003), the DTL experienced serious issues. The first problem was the inability to maintain resonant frequency at full power. The second problem was increased occurrences of over-temperature failure of cooling hoses. These shortcomings led to an investigation during the 2003 yearly preventative maintenance shutdown that showed evidence of excessive heating: discolored interior tank walls and coper oxide deposition in the cooling circuits. Since overheating was suspected to be caused by compromised heat transfer, improving that was the focus of the repair effort. Investigations revealed copper oxide flow inhibition and iron oxide scale build up. Acid cleaning was implemented with careful attention to protection of the base metal, selection of components to clean and minimization of exposure times. The effort has been very successful in bringing the accelerator through a complete eight month run cycle allowing an incredible array of scientific experiments to be completed this year (2003-2004). This paper will describe the systems, investigation analysis, repair, return to production and conclusion.

  14. Decontamination and decommissioning surveillance and maintenance report for FY 1991

    SciTech Connect (OSTI)

    Not Available

    1991-12-01T23:59:59.000Z

    The Decontamination and Decommissioning (D D) Program has three distinct phases: (1) surveillance and maintenance (S M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D D is devoted to S M at each of the sites. Our S M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

  15. Business expansion and lean transformation for helicopter blade shop

    E-Print Network [OSTI]

    Bar, S. Neil (Saumen Neil)

    2006-01-01T23:59:59.000Z

    Sikorsky Aircraft is undergoing a lean transformation as its helicopter blade line is relocated from Stratford to Site B. Value Stream Mapping is a vital tool to eliminate sources of waste in the existing blade shop and ...

  16. HEART SMART NUTRITION Heart Smart Shopping & Label Reading

    E-Print Network [OSTI]

    Lesson 3 HEART SMART NUTRITION Heart Smart Shopping & Label Reading What's the first step in fat. Your goal is to eat a diet lower in saturated fat, trans fat, and cholesterol. The National Heart

  17. Condition assessment methodologies for maintenance and repair decisions

    E-Print Network [OSTI]

    Bouvier, Charles

    2012-06-07T23:59:59.000Z

    be normalized to Gnd: P[T = to i Z = g] = 018 / (018 + 016) = 0. 529 P[T = t( ~ Z = zj&] 0, 471 Those are the posterior probabilities. The new expected losses associated to the actions a, and a, (cf. figure 5) can then be calculated: E[L(ao ~ zo)] = P... of MASTER OF SCIENCE Approved as to style and content by; Glen R. Andersen (Chair of committee) W. Edward Back (Member) I T. P. Y (Member) ytcho Lazarov (Member) hn M. Niedzwecki In rimheadofDep ent) December 1997 Major Subject: Civil...

  18. Electric Motor Maintenance & Repair for Long Term Efficiency

    E-Print Network [OSTI]

    Brithinee, W. P.

    Energy costs to operate electric motors can be a significant part of an operating budget. For example, a recent survey of California water departments reveals energy costs for pumping and treating water may be 25% of operating costs. Strategies...

  19. Solar Water Heating System Maintenance and Repair | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehicles »ExchangeDepartmentResolveFuture | DepartmentSo Simple ItHeating

  20. Automobile Repair Shop In 1987, the Alaska Health Project has performed an audit of an automobile

    E-Print Network [OSTI]

    Part 268). 2) Disposal in a authorized high-temperature incinerator. 3) Disposal to an authorized assumes incineration is the disposal method. If the waste is disposed of in a landfill or by recycling, costs may be reduced. However, considering the new solvent ban on land disposal incineration

  1. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Bill Bruce; Nancy Porter; George Ritter; Matt Boring; Mark Lozev; Ian Harris; Bill Mohr; Dennis Harwig; Robin Gordon; Chris Neary; Mike Sullivan

    2005-07-20T23:59:59.000Z

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. In lieu of a field installation on an abandoned pipeline, a preliminary nondestructive testing protocol is being developed to determine the success or failure of the fiber-reinforced liner pipeline repairs. Optimization and validation activities for carbon-fiber repair methods are ongoing.

  2. UCSC EMPLOYEE HOUSING APARTMENTS APPLICATION Rental rates include: rent, refuse collection, common area utilities, groundskeeping services, and repairs and

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    area utilities, groundskeeping services, and repairs and maintenance of the Laureate Court complex. Tenants pay for their own utilities (i.e., electricity, gas, water, telephone and cable services). A $750

  3. Centralized maintenance procedures

    SciTech Connect (OSTI)

    Barber, J.R.

    1994-02-01T23:59:59.000Z

    In 1989, shortly after Westinghouse Hanford Company (WHC) assumed maintenance responsibilities for the Hanford site, a Department of Energy (DOE) maintenance audit found that field (working level) maintenance procedures and procedure practices of the facilities scattered across Hanford`s 560 square miles varied as greatly as the locations of those facilities. In some of the audited facilities there were few or no procedures; in others, procedures conflicted with or were redundant to procedures at other facilities. This document presents current efforts to centralize maintenance procedures.

  4. HVAC Maintenance and Technologies

    Broader source: Energy.gov [DOE]

    Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

  5. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-12-31T23:59:59.000Z

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. The first round of optimization and validation activities for carbon-fiber repairs are complete. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

  6. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-08-17T23:59:59.000Z

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

  7. Rapid road repair vehicle

    DOE Patents [OSTI]

    Mara, Leo M. (Livermore, CA)

    1999-01-01T23:59:59.000Z

    Disclosed are improvments to a rapid road repair vehicle comprising an improved cleaning device arrangement, two dispensing arrays for filling defects more rapidly and efficiently, an array of pre-heaters to heat the road way surface in order to help the repair material better bond to the repaired surface, a means for detecting, measuring, and computing the number, location and volume of each of the detected surface imperfection, and a computer means schema for controlling the operation of the plurality of vehicle subsystems. The improved vehicle is, therefore, better able to perform its intended function of filling surface imperfections while moving over those surfaces at near normal traffic speeds.

  8. Lean strategies for future body shop development and operation in the automotive industry by Iker Marcaide.

    E-Print Network [OSTI]

    Marcaide, Iker

    2010-01-01T23:59:59.000Z

    There are several body shops which are similar by size of workforce, level of utilization and product complexity but which differ considerably by investment required, shop size, uptime, inventory levels and quality ...

  9. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; Nancy Porter; Mike Sullivan; Chris Neary

    2004-04-12T23:59:59.000Z

    The two broad categories of deposited weld metal repair and fiber-reinforced composite liner repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repair and for fiber-reinforced composite liner repair. Evaluation trials have been conducted using a modified fiber-reinforced composite liner provided by RolaTube and pipe sections without liners. All pipe section specimens failed in areas of simulated damage. Pipe sections containing fiber-reinforced composite liners failed at pressures marginally greater than the pipe sections without liners. The next step is to evaluate a liner material with a modulus of elasticity approximately 95% of the modulus of elasticity for steel. Preliminary welding parameters were developed for deposited weld metal repair in preparation of the receipt of Pacific Gas & Electric's internal pipeline welding repair system (that was designed specifically for 559 mm (22 in.) diameter pipe) and the receipt of 559 mm (22 in.) pipe sections from Panhandle Eastern. The next steps are to transfer welding parameters to the PG&E system and to pressure test repaired pipe sections to failure. A survey of pipeline operators was conducted to better understand the needs and performance requirements of the natural gas transmission industry regarding internal repair. Completed surveys contained the following principal conclusions: (1) Use of internal weld repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling (HDD) when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) Pipe diameter sizes range from 50.8 mm (2 in.) through 1,219.2 mm (48 in.). The most common size range for 80% to 90% of operators surveyed is 508 mm to 762 mm (20 in. to 30 in.), with 95% using 558.8 mm (22 in.) pipe. An evaluation of potential repair methods clearly indicates that the project should continue to focus on the development of a repair process involving the use of GMAW welding and on the development of a repair process involving the use of fiber-reinforced composite liners.

  10. Remote Shopping Robot System -Development of a hand mechanism for grasping fresh foods in a supermarket

    E-Print Network [OSTI]

    Ohya, Akihisa

    supermarkets, in this research, we propose "remote shopping robot system" as a concrete application efficiency. II. REMOTE SHOPPING ROBOT SYSTEM A. Concept In the case of industrial products, objects haveRemote Shopping Robot System -Development of a hand mechanism for grasping fresh foods

  11. A CONSTANT-INVENTORY TACTICAL PLANNING MODEL FOR A JOB SHOP

    E-Print Network [OSTI]

    Graves, Stephen C.

    A CONSTANT-INVENTORY TACTICAL PLANNING MODEL FOR A JOB SHOP Stephen C. Graves Massachusetts a constant-inventory tactical planning model for a generic manufacturing system, such as a job shop assume that we can regulate the release of work to the shop to maintain the constant-inventory constraint

  12. Operations and Maintenance Program Structure

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

  13. CRAD, Maintenance Assessment Plan

    Broader source: Energy.gov [DOE]

    An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations.

  14. Seasonal Landscape Maintenance

    E-Print Network [OSTI]

    Balasundaram, Balabhaskar "Baski"

    Seasonal Landscape Maintenance Oklahoma State University, in compliance with Title VI and VII State University's Department of Horticulture and Landscape Architecture and Oklahoma Cooperative to dry between watering allows plants to develop stronger, deeper roots. However, some landscape plants

  15. Instruction Guide Shopping Using the Product Keyword Search

    E-Print Network [OSTI]

    Sheremet, Alexandru

    powerful search engine. Start with by entering an item into the search field and follow the steps outlined the Home/Shop tab at the top to start your search 3. To start searching for an item, enter the item in the search field ­ include specific search terms, such as "latex-free gloves" instead of just "gloves

  16. Visopt ShopFloor System: Integrating Planning into Production Scheduling

    E-Print Network [OSTI]

    Bartak, Roman

    Visopt ShopFloor System: Integrating Planning into Production Scheduling Roman Barták Charles, the first machine pre-processes the item (3 time units) that is finished in the second machine (additional 3 in parallel and a worker is required (left) or via a serial production when the item is pre- processed

  17. A laboratory experiment from the Little Shop of Physics at

    E-Print Network [OSTI]

    Hardy, Darel

    1 A laboratory experiment from the Little Shop of Physics at Colorado State University CMMAP Reach a short wavelength. Of course, there's more to the spectrum than this; beyond the red is the longer was brighter, and clearly had more energy, but something about it was lacking. It was Albert Einstein who came

  18. A laboratory experiment from the Little Shop of Physics at

    E-Print Network [OSTI]

    Hardy, Darel

    1 A laboratory experiment from the Little Shop of Physics at Colorado State University CMMAP Reach of colors from red to violet is the spread of different wavelengths that makes up visible light. Of course different parts of the spectrum: Wavelength and energy. The red end of the rainbow corresponds to long

  19. Electric motor model repair specifications

    SciTech Connect (OSTI)

    NONE

    1995-08-01T23:59:59.000Z

    These model repair specifications list the minimum requirements for repair and overhaul of polyphase AC squireel cage induction motors. All power ranges, voltages, and speeds of squirrel cage motors are covered.

  20. Maintenance manual for the Beneficial Uses Shipping System cask. Revision 1

    SciTech Connect (OSTI)

    Bronowski, D.R.; Yoshimura, H.R.

    1993-05-01T23:59:59.000Z

    This document is the Maintenance Manual for the Beneficial Uses Shipping System (BUSS) cask. These instructions address requirements for maintenance, inspection, testing, and repair, supplementing general information found in the BUSS Safety Analysis Report for Packaging (SARP), SAND 83-0698. Use of the BUSS cask is authorized by the Department of Energy (DOE) and the Nuclear Regulatory Commission (NRC) for the shipment of special form cesium chloride or strontium flouride capsules.

  1. A formal ontology for industrial maintenance

    E-Print Network [OSTI]

    Boyer, Edmond

    strategies (preventive maintenance, predictive maintenance, corrective maintenance), to managing operators1 A formal ontology for industrial maintenance Authors: 1- Dr. Mohamed Hedi KARRAY, LGP The rapid advancement of information and communication technologies has resulted in a variety of maintenance

  2. Window Replacement, Rehabilitation, & Repair Guides - Building...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Effec...

  3. Engineering Evaluation/Cost Analysis (EE/CA) for Decommissioning of TAN-607 Hot Shop Area

    SciTech Connect (OSTI)

    J. P. Floerke

    2007-02-05T23:59:59.000Z

    Test Area North (TAN) -607, the Technical Support Facility, is located at the north end of the Idaho National Laboratory (INL) Site. U.S. Department of Energy Idaho Operations Office (DOE-ID) is proposing to decommission the northern section of the TAN-607 facility, hereinafter referred to as TAN-607 Hot Shop Area, under a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) non-time-critical removal action (NTCRA). Despite significant efforts by the United States (U.S.) Department of Energy (DOE) to secure new business, no future mission has been identified for the TAN-607 Hot Shop Area. Its disposition has been agreed to by the Idaho State Historical Preservation Office documented in the Memorandum of Agreement signed October 2005 and it is therefore considered a surplus facility. A key element in DOE's strategy for surplus facilities is decommissioning to the maximum extent possible to ensure risk and building footprint reduction and thereby eliminating operations and maintenance cost. In addition, the DOE's 2006 Strategic Plan is ''complete cleanup of the contaminated nuclear weapons manufacturing and testing sites across the United States. DOE is responsible for the risk reduction and cleanup of the environmental legacy of the Nation's nuclear weapons program, one of the largest, most diverse, and technically complex environmental programs in the world. The Department will successfully achieve this strategic goal by ensuring the safety of the DOE employees and U.S. citizens, acquiring the best resources to complete the complex tasks, and managing projects throughout the United States in the most efficient and effective manner.'' TAN-607 is designated as a historical Signature Property by DOE Headquarters Advisory Council on Historic Preservation and, as such, public participation is required to determine the final disposition of the facility. The decommissioning action will place the TAN-607 Hot Shop Area in a final configuration that will be protective of human health and the environment. Decommissioning the TAN-607 Hot Shop Area is consistent with the joint DOE and U.S. Environmental Protection Agency (EPA) Policy on Decommissioning of Department of Energy Facilities Under the Comprehensive Environmental Response, Compensation and Liability Act, which establishes the CERCLA NTCRA process as the preferred approach for decommissioning surplus DOE facilities. Under this policy, a NTCRA may be taken when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to human health and/or the environment. When DOE determines that a CERCLA NTCRA is necessary, DOE is authorized to evaluate, select, and implement the removal action that DOE determines is most appropriate to address the potential risk posed by the release or threat of release. This action is taken in accordance with applicable authorities and in conjunction with EPA and the State of Idaho pursuant to Section 5.3 of the Federal Facility Agreement and Consent Order. In keeping with the joint policy, this engineering evaluation/cost analysis (EE/CA) was developed in accordance with CERCLA as amended by the ''Superfund Amendments and Reauthorization Act of 1986'' and in accordance with the ''National Oil and Hazardous Substances Pollution Contingency Plan.'' This EE/CA is consistent with the remedial action objectives (RAOs) of the Final Record of Decision, Test Area North, Operable Unit 1-10 and supports the overall remediation goals established through the Federal Facility Agreement and Consent Order for Waste Area Group 1. Waste Area Group 1 is located at TAN.

  4. Operations and maintenance philosophy

    SciTech Connect (OSTI)

    DUNCAN, G.P.

    1999-10-28T23:59:59.000Z

    This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

  5. CH Packaging Maintenance Manual

    SciTech Connect (OSTI)

    Washington TRU Solutions

    2002-01-02T23:59:59.000Z

    This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests.

  6. Action Memorandum for Decommissioning of TAN-607 Hot Shop Area

    SciTech Connect (OSTI)

    M. A. Pinzel

    2007-05-01T23:59:59.000Z

    The Department of Energy is documenting the selection of an alternative for the TAN-607 Hot Shop Area using a Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action (NTCRA). The scope of the removal action is limited to TAN-607 Hot Shop Area. An engineering evaluation/cost analysis (EE/CA) has assisted the Department of Energy Idaho Operations Office in identifuomg the most effective method for performing the decommissioning of this structure whose mission has ended. TAN-607 Hot Shop Area is located at Test Area North Technical Support Facility within the Idaho National Laboratory Site. The selected alternative consists of demolishing the TAN-607 aboveground structures and components, removing belowground noninert components (e.g. wood products), and removing the radiologically contaminated debris that does not meet remedial action objectives (RAOs), as defined in the Record of Decision Amendment for the V-Tanks and Explanation of Significant Differences for the PM-2A Tanks at Test Area North, Operable Unit 1-10.

  7. At CSUF, we stress the importance of bicycle safety and proper bicycle maintenance. Special incentives

    E-Print Network [OSTI]

    de Lijser, Peter

    At CSUF, we stress the importance of bicycle safety and proper bicycle maintenance. Special incentives and training classes are available for bicycle riders and vehicle drivers alike. Bicycle "Fix-it" Stations A well maintained bicycle is a safer bicycle. Campus bike repair stations offer free tools so

  8. Proposed SOLCOST maintenance activities

    SciTech Connect (OSTI)

    none,

    1980-01-01T23:59:59.000Z

    This document provides a short description of work that has been accomplished to date and work in progress. A discussion of the program status as it is currently configured follows and finally proposed work by Solar Environmental Engineering Company (SEEC) in its most recently signed contract with the Department of Energy (DOE) is given. Early statements are designed to give the reader a good background so that the suggested SOLCOST maintenance activities will be more easily understood.

  9. Record of Decision/Remedial Alternative Selection for the Motor Shops Seepage Basin (716-A)

    SciTech Connect (OSTI)

    Palmer, E.

    1999-02-03T23:59:59.000Z

    This decision document presents the selected remedial alternative for the Motor Shops Seepage Basin located at the Savannah River Site in Aiken, South Carolina

  10. Decontamination and decommissioning surveillance and maintenance report for FY 1991. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1991-12-01T23:59:59.000Z

    The Decontamination and Decommissioning (D&D) Program has three distinct phases: (1) surveillance and maintenance (S&M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D&D is devoted to S&M at each of the sites. Our S&M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S&M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

  11. In-depth survey report: Control technology for small business: Evaluation of a flexible duct ventilation system for radiator repair, at A-1 Radiator, Reno, Nevada

    SciTech Connect (OSTI)

    Sheehy, J.W.; Cooper, T.C.; Hall, R.M.; Meier, R.M.

    1990-02-01T23:59:59.000Z

    An engineering control evaluation was conducted at a radiator repair shop which operated at a very high level of production. The shop had the potential for high exposures to lead (7439921) because of the high volume of work, the number of radiator repair stations, and repairs to huge radiators for mining equipment. Local exhaust ventilation which utilized adjustable arm elephant trunk exhaust hoods had been installed 18 months prior to the visit. The objective of the study was to evaluate the effectiveness of the local exhaust ventilation (LEV) system to control lead exposures during work operations. Time weighted average personal exposures for lead were at or below the OSHA permissible exposure level for ten of 15 mechanics during a high level of production. The elephant trunk ventilation system was capable of controlling lead fumes while shop doors were open, except at one tank in a corner. Work practices were found to be a source of excessive lead exposure. Emissions from a worker's own soldering and from soldering activity upwind of the worker were a major source of lead exposure. Collapse of flexible portions of ducts could reduce exhaust volume. Dampers also showed a tendency to close automatically.

  12. Nitrous Oxide Systems Maintenance in Clinical Areas

    E-Print Network [OSTI]

    Jia, Songtao

    . It specifically speaks to maintenance of nitrous oxide delivery systems, preventive maintenance for house. Arrange with Facilities for regular preventive maintenance and annual performance check of ventilation). b. Provides preventive maintenance on ventilation system as necessary. c. Coordinates annual

  13. Scheduling with Fixed Maintenance, Shared Resources and ...

    E-Print Network [OSTI]

    2015-02-07T23:59:59.000Z

    Nov 17, 2014 ... maintenance constraints, blending and shared resources. ...... tegrated fixed time interval preventive maintenance and production for schedul-.

  14. Africa's Transport Infrastructure Mainstreaming Maintenance and...

    Open Energy Info (EERE)

    Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management...

  15. Motor Repair Tech Brief

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F S i DOE TribaltheMyMinutesDepartmentCharacteristics | Motor Repair

  16. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky Learning Fun withGenepool Quarterly MaintenanceGenepool

  17. Operations & Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOilOnlineandOperations and Maintenance

  18. Better approximation guarantees for job-shop scheduling

    SciTech Connect (OSTI)

    Goldberg, L.A.; Paterson, M. [Univ. of Warwick, Conventry (United Kingdom); Srinivasan, A. [National Univ. of Singapore (Singapore)] [and others

    1997-06-01T23:59:59.000Z

    Job-shop scheduling is a classical NP-hard problem. Shmoys, Stein & Wein presented the first polynomial-time approximation algorithm for this problem that has a good (polylogarithmic) approximation guarantee. We improve the approximation guarantee of their work, and present further improvements for some important NP-hard special cases of this problem (e.g., in the preemptive case where machines can suspend work on operations and later resume). We also present NC algorithms with improved approximation guarantees for some NP-hard special cases.

  19. Industrial motor repair in the United States

    SciTech Connect (OSTI)

    Schueler, V.; Leistner, P.; Douglass, J.

    1994-09-01T23:59:59.000Z

    This report characterizes the motor repair industry in the United States; summarizes current motor repair and testing practice; and identifies barriers to energy motor repair practice and recommends strategies for overcoming those barriers.

  20. Development and validation of bonded composite doubler repairs for commercial aircraft.

    SciTech Connect (OSTI)

    Roach, Dennis Patrick; Rackow, Kirk A.

    2007-07-01T23:59:59.000Z

    A typical aircraft can experience over 2,000 fatigue cycles (cabin pressurizations) and even greater flight hours in a single year. An unavoidable by-product of aircraft use is that crack, impact, and corrosion flaws develop throughout the aircraft's skin and substructure elements. Economic barriers to the purchase of new aircraft have placed even greater demands on efficient and safe repair methods. The use of bonded composite doublers offers the airframe manufacturers and aircraft maintenance facilities a cost effective method to safely extend the lives of their aircraft. Instead of riveting multiple steel or aluminum plates to facilitate an aircraft repair, it is now possible to bond a single Boron-Epoxy composite doubler to the damaged structure. The FAA's Airworthiness Assurance Center at Sandia National Labs (AANC), Boeing, and Federal Express completed a pilot program to validate and introduce composite doubler repair technology to the U.S. commercial aircraft industry. This project focused on repair of DC-10 fuselage structure and its primary goal was to demonstrate routine use of this repair technology using niche applications that streamline the design-to-installation process. As composite doubler repairs gradually appear in the commercial aircraft arena, successful flight operation data is being accumulated. These commercial aircraft repairs are not only demonstrating the engineering and economic advantages of composite doubler technology but they are also establishing the ability of commercial maintenance depots to safely adopt this repair technique. This report presents the array of engineering activities that were completed in order to make this technology available for widespread commercial aircraft use. Focused laboratory testing was conducted to compliment the field data and to address specific issues regarding damage tolerance and flaw growth in composite doubler repairs. Fatigue and strength tests were performed on a simulated wing repair using a substandard design and a flawed installation. In addition, the new Sol-Gel surface preparation technique was evaluated. Fatigue coupon tests produced Sol-Gel results that could be compared with a large performance database from conventional, riveted repairs. It was demonstrated that not only can composite doublers perform well in severe off-design conditions (low doubler stiffness and presence of defects in doubler installation) but that the Sol-Gel surface preparation technique is easier and quicker to carry out while still producing optimum bonding properties. Nondestructive inspection (NDI) methods were developed so that the potential for disbond and delamination growth could be monitored and crack growth mitigation could be quantified. The NDI methods were validated using full-scale test articles and the FedEx aircraft installations. It was demonstrated that specialized NDI techniques can detect flaws in composite doubler installations before they reach critical size. Probability of Detection studies were integrated into the FedEx training in order to quantify the ability of aircraft maintenance depots to properly monitor these repairs. In addition, Boeing Structural Repair and Nondestructive Testing Manuals were modified to include composite doubler repair and inspection procedures. This report presents the results from the FedEx Pilot Program that involved installation and surveillance of numerous repairs on operating aircraft. Results from critical NDI evaluations are reported in light of damage tolerance assessments for bonded composite doublers. This work has produced significant interest from airlines and aircraft manufacturers. The successful Pilot Program produced flight performance history to establish the durability of bonded composite patches as a permanent repair on commercial aircraft structures. This report discusses both the laboratory data and Pilot Program results from repair installations on operating aircraft to introduce composite doubler repairs into mainstream commercial aircraft use.

  1. Waste Minimization Plans and activities in the MFD Plating Shop

    SciTech Connect (OSTI)

    Dini, J.W.; Steffani, C.P.

    1991-02-01T23:59:59.000Z

    The Plating Shop (Building 322), provides processes such as electroplating, electroless plating, anodizing, cleaning, etching, electroforming and chemical milling. We in MFD are committed to an active program on waste minimization, and the purpose of this document is to outline the plan of action. Our short range minimization goals are threefold: (1) Reduce our major waste stream by 90%, (2) Minimize discharge of rinse water to sewer system, and (3) Eliminate vapor degreasing in the shop. The intermediate goals consist of characterizing the waste streams and evaluating recovery processes. To do this, we first need to have the distillation unit operational and time to determine its effectiveness. If it proves to be as effective as we anticipate, we will perhaps purchase a second unit. Regardless, the streams that we can identify include: nickel, copper, rinses, acids, alkalies, electropolish and miscellaneous. Our goal is to utilize electrolytic processes to recover metals such as nickel and copper and processes such as ion exchange for some of the other streams. We intend to evaluate the full gamut of recycling processes available for these streams. We anticipate completing this phase of the minimization program by January 1993. The long range goal is zero discharge or since this could prove extremely difficult, development of processes that will allow us to produce a sludge cake that could be handled by our Hazardous Waste Management Group.

  2. Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness

    SciTech Connect (OSTI)

    Vesely, W.E.; Rezos, J.T. [Science Applications International Corp., Dublin, OH (United States)

    1995-09-01T23:59:59.000Z

    This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

  3. Development of a maintenance program

    SciTech Connect (OSTI)

    Walker, I.

    1987-01-01T23:59:59.000Z

    Bruce Nuclear Generating Station (NGS) A in Tiverton, Ontario, has been operating for 10 yr. One reason for its successful operating record is the development of an effective preventive maintenance program. Evaluation of the existing preventive program included a review of maintenance of selected key equipment over the life of the station. The review emphasized the need to improve the storage and sorting of maintenance information for trend and cost analysis, manpower planning, reliability, and radiation dose calculations.

  4. Plant maintenance and plant life extension issue, 2008

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2008-03-15T23:59:59.000Z

    The focus of the March-April issue is on plant maintenance and plant life extension. Major articles include the following: Exciting time to be at the U.S. NRC, by Dale Klein, Nuclear Regulatory Commission; Extraordinary steps to ensure a minimal environmental impact, by George Vanderheyden, UniStar Nuclear Energy, LLC.; Focused on consistent reduction of outages, by Kevin Walsh, GE Hitachi Nuclear Energy; On the path towards operational excellence, by Ricardo Perez, Westinghouse Electric Company; Ability to be refuelled on-line, by Ian Trotman, CANDU Services, Atomic Energy of Canada, Ltd.; ASCA Application for maintenance of SG secondary side, by Patrick Wagner, Wolf Creek Nuclear Operating Corporation, Phillip Battaglia and David Selfridge, Westinghouse Electric Company; and, An integral part of the landscape and lives, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Steam generator bowl drain repairs, by John Makar and Richard Gimple, Wolf Creek Nuclear Operating Corporation.

  5. Scheduling optimization of a real flexible job shop including side ...

    E-Print Network [OSTI]

    2013-08-19T23:59:59.000Z

    Aug 19, 2013 ... The multitask cell at GKN Aerospace Sweden is a production cell con- ...... In order to demonstrate the effect of the squeezing procedure we solved ..... [13] J. Gao, M. Gen, L. Sun, Scheduling jobs and maintenances in flexible.

  6. Dam Construction and Maintenance (Minnesota)

    Broader source: Energy.gov [DOE]

    Dams may be constructed, improved, or repaired on private, non-navigable waters subject to certain timelines; however, previously-developed hydropower mechanisms cannot be disrupted. The State may...

  7. Hot repair of ceramic burner on hot blast stoves at USS/Kobe`s {number_sign}3 blast furnace

    SciTech Connect (OSTI)

    Bernarding, T.F.; Chemorov, M.; Shimono, S.; Phillips, G.R.

    1997-12-31T23:59:59.000Z

    During the 1992 reline of the No. 3 blast furnace, three new stoves were constructed. The design of the stoves, equipped with internal ceramic burners, was for providing a hot blast temperature of 2,000 F at a wind rate of 140,000 SCFM. After 3 years the performance had deteriorated so the burners were cleaned. When a second cleaning did not improve the performance of No. 3 blast furnace, it was decided to repair the refractory while still hot. The paper describes the hot repair procedures, taking a stove off for repairs, maintenance heat up during repairs, two stove operation, stove commissioning, repair of a ceramic burner, and wet gas prevention.

  8. Landscape Maintenance Considerations for Homeowner

    E-Print Network [OSTI]

    Sanderson, Mike

    Landscape Maintenance Considerations for Homeowner Associations: Save Money, Be Safe, Look Good is getting their money's worth from the landscape maintenance company. Photo credit: Asset Landscaping! Kelly Murray Young Haley Paul #12;1. Consider landscape plants a long- term investment · Trees

  9. TAN Hot Shop and Support Facility Utilization Study

    SciTech Connect (OSTI)

    Picker, B.A.

    2001-11-16T23:59:59.000Z

    Impacts to the U.S. Department of Energy (DOE) complex caused by early closure (prior to 2018) and Demolition and Dismantlement (D and D) of the Test Area North (TAN) hot shop and its support facilities are explored in this report. Various possible conditions, such as Standby, Safe Store and Lay-up, that the facility may be placed in prior to eventually being turned over to D and D are addressed. The requirements, impacts, and implications to the facility and to the DOE Complex are discussed for each condition presented in the report. Some details of the report reference the Idaho National Engineering and Environmental Laboratory (INEEL) Spent Nuclear Fuel Life Cycle Baseline Plan, the INEEL 2000 Infrastructure Long Range Plan, and other internal INEEL reports.

  10. TAN HOT SHOP AND SUPPORT FACILITY UTILIZATION STUDY

    SciTech Connect (OSTI)

    Phillips, Ken Crawforth

    2001-11-01T23:59:59.000Z

    Impacts to the U.S. Department of Energy (DOE) complex caused by early closure (prior to 2018) and Demolition and Dismantlement (D&D) of the Test Area North (TAN) hot shop and its support facilities are explored in this report. Various possible conditions, such as Standby, Safe Store and Lay-up, that the facility may be placed in prior to eventually being turned over to D&D are addressed. The requirements, impacts, and implications to the facility and to the DOE Complex are discussed for each condition presented in the report. Some details of the report reference the Idaho National Engineering and Environmental Laboratory (INEEL) Spent Nuclear Fuel Life Cycle Baseline Plan, the INEEL 2000 Infrastructure Long Range Plan, and other internal INEEL reports.

  11. DockingShop: A Tool for Interactive Molecular Docking

    SciTech Connect (OSTI)

    Lu, Ting-Cheng; Max, Nelson L.; Ding, Jinhui; Bethel, E. Wes; Crivelli, Silvia N.

    2005-04-24T23:59:59.000Z

    Given two independently determined molecular structures, the molecular docking problem predicts the bound association, or best fit between them, while allowing for conformational changes of the individual molecules during construction of a molecular complex. Docking Shop is an integrated environment that permits interactive molecular docking by navigating a ligand or protein to an estimated binding site of a receptor with real-time graphical feedback of scoring factors as visual guides. Our program can be used to create initial configurations for a protein docking prediction process. Its output--the structure of aprotein-ligand or protein-protein complex--may serve as an input for aprotein docking algorithm, or an optimization process. This tool provides molecular graphics interfaces for structure modeling, interactive manipulation, navigation, optimization, and dynamic visualization to aid users steer the prediction process using their biological knowledge.

  12. ACADEMIC MACHINE SHOP SAFETY Procedure: 6.01 Created: 7/2011 Version: 2.0 Revised: 9/30/2013

    E-Print Network [OSTI]

    Jia, Songtao

    ACADEMIC MACHINE SHOP SAFETY Procedure: 6.01 Created: 7/2011 Version: 2.0 Revised: 9, staff and visitors working in any Academic Machine Shop. It defines safety guidelines, training in a machine shop. B. Applicability/Scope Applicability: This policy covers users of all Academic Machine Shops

  13. Large steam turbine repair: A survey

    SciTech Connect (OSTI)

    Findlan, S.J.; Lube, B. (EPRI Nondestructive Evaluation Center, Charlotte, NC (United States))

    1991-07-01T23:59:59.000Z

    This report covers a survey taken to document the current state-of-the-art in repairs to large steam turbines. One objective was to provide information to assist utilities in making repair or replacement decisions. The survey revealed that a large number of repairs have been successfully repaired involving both mechanical and welding repair techniques. Repair techniques have been improving in recent years and are being used more frequently. No guidelines or codes exist for the repair of steam turbine components so each repair is primarily controlled by agreement between the utility, contractor and insurer. Types of repairs are reviewed in this report and in addition, the capabilities of various contractors who are currently active in providing repair service. 40 refs., 10 figs., 4 tabs.

  14. Inspect and Repair Steam Traps

    SciTech Connect (OSTI)

    Not Available

    2006-01-01T23:59:59.000Z

    This revised ITP tip sheet on inspecting and repairing steam traps provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  15. Argonne/EPA system captures mercury from air in gold shops |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the mercury vaporizes. The vaporized mercury is directed outside the shop into the open air where it descends onto homes, water and food of the local populations. Image credit:...

  16. New Lighting Facts Label: Takes the Guess Work Out of Shopping...

    Office of Environmental Management (EM)

    cost for the year, and the color of the light (from warmyellowish, to white to coolblue). Download our placard Lumens: the new way to shop for light to see how to use the...

  17. Operations and Maintenance Program Measurement

    Broader source: Energy.gov [DOE]

    Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a...

  18. Maintenance Practices for LED Streetlights

    Broader source: Energy.gov [DOE]

    This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

  19. Maintenance FUSION IGNITION RESEARCH EXPERIMENT

    E-Print Network [OSTI]

    Insulation Enclosure Remote Maintenance Module FUSION IGNITION RESEARCH EXPERIMENT SYSTEM describes the status of the configuration development and the integration of the major subsystem components vessel structural stiffness, this configuration makes use of the cooling jacket as nuclear shielding

  20. Categorical Exclusion for Maintenance Work

    Broader source: Energy.gov (indexed) [DOE]

    Maintenance Work along the Electrical District 5 to Saguaro segment (414 to 585) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal...

  1. Operations and Maintenance Management Support

    Broader source: Energy.gov [DOE]

    Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows...

  2. Business Development - Predictive Maintenance Products

    E-Print Network [OSTI]

    Sceiczina, P.

    2005-01-01T23:59:59.000Z

    BUSINESS DEVELOPMENT - PREDICTIVE MAINTENANCE PRODUCTS Phillip Sceiczina, ifm efector, inc. In this time of global competitiveness, more companies are focusing on reducing manufacturing costs to increase profits. Energy costs can be a...

  3. Sustainable Operations & Maintenance Implementation Support

    E-Print Network [OSTI]

    , and purchasing policy: Energy efficiency cannot exist without accountability and organizational support energy efficiency in buildings. Organizational innovation for energy conservation; Organizations face of energy efficiency. Meetings with facilities personnel, maintenance staff, building managers, building oc

  4. Turfgrass: Maintenance Costs in Texas.

    E-Print Network [OSTI]

    Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

    1964-01-01T23:59:59.000Z

    . These regions also have high water costs. The Gulf Coast, where water is a minor item, has an average expenditure only slightly greater than half that in West Texas. Average lawn sizes in these two regions are almost identical. Use of com- post, commercial.... Individuals with grasses other than bermuda and St. Augustine spend on the average about 53 percent TARLE 2. TOTALS OF VARIOUS HOME LAWN MAINTENANCE EXPENDITURES WITHIN REGIONS AND FOR THE STATE1 Number of Maintenance items Region households Commercial...

  5. Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects

    SciTech Connect (OSTI)

    Wood, A.; Wiehagen, J.

    2012-09-01T23:59:59.000Z

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  6. User data package for implementation of electrolytic recovery technology in Navy electroplating shops. Final report, March 1993-January 1995

    SciTech Connect (OSTI)

    Ford, K.; Koff, J.

    1995-10-01T23:59:59.000Z

    In FY94 the Naval Facilities Engineering Service Center (NFESC) completed tests on three electrolytic recovery systems used for the recovery of metals and destruction of cyanide from electroplating wastewaters. Field testing and evaluation was conducted at NSY Norfolk, NAWC Indianapolis, and NADEP Cherry Pt. for five metal recovery applications: silver cyanide, copper cyanide, acid copper, electroless nickel, and tin-lead fluoborate. Advanced design features for metal recovery, including enhanced fluidized circulation, specialized oxidizing anodes, and high porous surface area cathodes were evaluated to optimize performance. NFESC demonstrated that electrolytic recovery systems can be adapted for effective use in the Navy plating operations where production is often sporadic as contrasted to industrial plating processes. The electrolytic recovery units removed metal ions from the rinsewater to below 1 ppm for each application. Electrowinning, as an alternative technology, can reduce industrial waste treatment costs and hazardous sludge generated from conventional treatment This User Data Package (UDP) covers the design, operational and maintenance requirements for these electrolytic systems. This UDP will be applicable to small Navy plating shops where closed-loop waste recycling and point source minimization is necessary for environmental compliance and cost competitiveness.

  7. Dynamic Scheduling of Maintenance Activities Under Uncertainties

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    of the required treatment. There are mainly two types of maintenance activities: the preventive maintenance, whoseDynamic Scheduling of Maintenance Activities Under Uncertainties Fran¸cois Marmier, Christophe in maintenance services field where the different practical knowledges or skills are their working tools. We

  8. Chapter 6.14 PROPERTY MAINTENANCE

    E-Print Network [OSTI]

    Lyubomirsky, Ilya

    Chapter 6.14 PROPERTY MAINTENANCE Sections: 6.14.010 Findings. 6.14.020 Landscape Maintenance. 6 of landscaping and/or landscape maintenance on private property, including overgrown, dead, or decayed vegetation of the residents of the City of Riverside. (Ord. 6970 § 2, 2007) Section 6.14.020 Landscape maintenance. A

  9. Operations and Maintenance Manual for Large Aperture Scanner System

    SciTech Connect (OSTI)

    Jones, Anthony M.; Hall, Thomas E.

    2010-04-08T23:59:59.000Z

    Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

  10. RCRA Facility Investigation/Remedial Investigation Report with the Baseline Risk Assessment for the 716-A Motor Shops Seepage Basin

    SciTech Connect (OSTI)

    Palmer, E.

    1997-08-25T23:59:59.000Z

    This document describes the RCRA Facility Investigation/Remedial Investigation/Baseline Risk Assessment of the 716-A Motor Shops Seepage Basin.

  11. Opportune maintenance and predictive maintenance decision support douard Thomas, ric Levrat, Benoit Iung, Pierre Cocheteux

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    : When to perform a particular maintenance action? What components should benefit from a preventive maintenance action? Which components should first benefit from a preventive maintenance interventionOpportune maintenance and predictive maintenance decision support Ă?douard Thomas, Ă?ric Levrat

  12. Airline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches

    E-Print Network [OSTI]

    -based. The preventative alternative involves the transmission of maintenance data to maintenance personnel whenAirline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches Mike Dupuy, Dan Wesely, Cody Jenkins Abstract ­ Airline maintenance is a significant contributor

  13. Iron production maintenance effectiveness system

    SciTech Connect (OSTI)

    Augstman, J.J. [Dofasco Inc., Hamilton, Ontario (Canada)

    1996-12-31T23:59:59.000Z

    In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

  14. Verification of Motor Repair Quality

    E-Print Network [OSTI]

    Butler, K.

    Motor testing at Advanced Energy has shown that a motor that has not suffered irreparable damage as a result of failure can be repaired to perform as well as before the failure. But the only way to achieve the performance level of an energy...

  15. Titanium addition practice, and maintenance for the hearths in AHMSA`s blast furnaces

    SciTech Connect (OSTI)

    Boone, A.G.; Jimenez, G.; Castillo, J. [Altos Hornos de Mexico, Monclova (Mexico)

    1997-12-31T23:59:59.000Z

    Altos Hornos de Mexico (AHMSA) is a steel company located in Northern Mexico, in the state of Coahuila. Currently there are three blast furnaces in operation and one more about to finish its general repair. This last one is to remain as a back-up unit. Because of blast furnace hearth wear outs AHMSA has developed some maintenance procedures. These procedures are based on titanium ore additions and hearth thermic control monitoring. There are also some other maintenance practices adopted to the working operations to assure that such operations detect and avoid in time hearth wear outs that place personnel and/or the unit in danger (due to hearth leaks). This paper describes titanium ore addition to No. 2 blast furnace during the final campaign and it also illustrates maintenance practices and continuous monitoring of temperature trends both of which were implemented at AHMSA`s No. 5 blast furnace.

  16. Dynamic Maintenance of Service Orchestrations

    E-Print Network [OSTI]

    Boyer, Edmond

    -Rocquencourt, France Valérie Issarny INRIA Paris-Rocquencourt, France ABSTRACT Service-oriented architectures evolved/orchestration of services. One of the next challenges in this field is the maintenance of service-oriented architectures orchestrations. 1. INTRODUCTION Service Oriented Architecture (SOA) is an architectural style that emerged

  17. Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM)

    Broader source: Energy.gov [DOE]

    Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND...

  18. Invertible Program Restructurings for Continuing Modular Maintenance

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Invertible Program Restructurings for Continuing Modular Maintenance Julien Cohen ASCOLA team (EMN in main- tenance with invertible program transformations. We illustrate this on the typical Expression problems with our approach. Keywords-modular maintenance; restructuring; invertible pro- gram

  19. Effects of dairy intake on weight maintenance

    E-Print Network [OSTI]

    Zemel, Michael B.; Donnelly, Joseph E.; Smith, Bryan K.; Sullivan, Debra K.; Richards, Joanna; Morgan-Hanusa, Danielle; Mayo, Matthew S.; Sun, Xiaocun; Cook-Wiens, Galen; Bailey, Bruce W.; Van Walleghen, Emily L.; Washburn, Richard A.

    2008-10-24T23:59:59.000Z

    , randomized trial. Weight loss was baseline to 3 months, weight maintenance was 4 to 9 months. Participants were maintained randomly assigned to low dairy ( 3 servings/d) diets for the maintenance phase. Three...

  20. Mining Surveillance and Maintenance Dollars

    SciTech Connect (OSTI)

    MARTINEZ, R.

    2000-02-01T23:59:59.000Z

    Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

  1. Maintenance and Prevention: Formalization and Fixpoint Characterization

    E-Print Network [OSTI]

    Maintenance and Prevention: Formalization and Fixpoint Characterization Munindar P. Singh Maintenance and prevention are important concepts in the science of intel­ ligent systems, yet serious research attention. Maintenance and prevention are duals of each other, but cannot be reduced

  2. ROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    activities: the preventive maintenance, whose activities can be long term planned, and the correctiveROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE François MARMIER , Christophe VARNIER. Especially in the field of maintenance services where the different practical knowledge or skills

  3. Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing

    E-Print Network [OSTI]

    Marcus, Steven I.

    1 Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing Xiaodong Yao, Emmanuel on Control Applications in 2001. #12;2 Abstract Preventive Maintenance (PM) scheduling is a very challenging schedule with that of a baseline reference schedule are also presented. Index Terms preventive maintenance

  4. Prognostics for the Maintenance of Distributed Systems

    E-Print Network [OSTI]

    Pencolé, Yannick

    but also higher level function prognosis. I. INTRODUCTION In the classical case, preventive maintenance of preventive maintenance for complex systems. In this sense, a distributed system can be split down into a setPrognostics for the Maintenance of Distributed Systems Pauline Ribot, Yannick Pencol´e and Michel

  5. Laboratory services series: a programmed maintenance system

    SciTech Connect (OSTI)

    Tuxbury, D.C.; Srite, B.E.

    1980-01-01T23:59:59.000Z

    The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

  6. STANDARD OPERATING PROCEDURES Annual Site Maintenance

    E-Print Network [OSTI]

    Fischer, Emily V.

    IMPROVE STANDARD OPERATING PROCEDURES SOP 226 Annual Site Maintenance Date Last Modified Modified This standard operating procedure (SOP) describes the procedures for annual maintenance of equipment Sampler Operation Manual #12;SOP 226: Annual Site Maintenance 3 1.0 PURPOSE AND APPLICABILITY

  7. SNORKEL PRO-66 DAILY INSPECTION AND MAINTENANCE CHECKLIST

    E-Print Network [OSTI]

    Gelfond, Michael

    not be operated if not in proper mechanical condition. All defects must be reported to the Electric Shop Foreman is to be returned to the BMC Electric Shop at the end of the day or the end of the job, whichever comes first. Beginning Hours: ______________ Ending Hours: ______________ Fuel (DIESEL): ________gallons List all

  8. National Synchrotron Light Source Facility Manual Maintenance Management Program. Revision 1

    SciTech Connect (OSTI)

    Fewell, N.

    1993-12-01T23:59:59.000Z

    The purpose of this program s to meet the policy and objectives for the management and performance of cost-effective maintenance and repair of the National Synchrotron Light Source, as required by the US Department of Energy order DOE 433O.4A. It is the DOE`s policy that: The maintenance management program for the NSLS be consistent with this Order and that NSLS property is maintained in a manner which promotes operational safety, worker health, environmental protection and compliance, property preservation, and cost-effectiveness while meeting the NSLS`s programmatic mission. Structures, components and systems (active and passive) that are imporant to safe operation of the NSLS shall be subject to a maintenance program to ensure that they meet or exceed their design requirements throughout the life of the NSLS. Periodic examination of structures, systems components and equipment be performed to determine deterioration or technical obsolescence which may threaten performance and/or safety. Primary responsibility, authority, and accountability for the direction and management of the maintenance program at the NSLS reside with the line management assigned direct programmatic responsibility. Budgeting and accounting for maintenance programs are consistent with DOE Orders guidance.

  9. Framing the Conversation: The Role of Facebook Conversations in Shopping for Eyeglasses

    E-Print Network [OSTI]

    Kane, Shaun K.

    Framing the Conversation: The Role of Facebook Conversations in Shopping for Eyeglasses Karim Said Warby Parker's Facebook page and explore the ways customers formulate questions and conversations,000 Facebook posts, consisting of photos, comments, and "likes". Using statistical analyses and qualitative

  10. 241-AZ-101 Waste Tank Color Video Camera System Shop Acceptance Test Report

    SciTech Connect (OSTI)

    WERRY, S.M.

    2000-03-23T23:59:59.000Z

    This report includes shop acceptance test results. The test was performed prior to installation at tank AZ-101. Both the camera system and camera purge system were originally sought and procured as a part of initial waste retrieval project W-151.

  11. Pacific Northwest Laboratory Maintenance Implementation plan

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-06-01T23:59:59.000Z

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  12. Pacific Northwest Laboratory Maintenance Implementation plan

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-06-01T23:59:59.000Z

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  13. Operating Policy for Facilities This policy establishes responsibility for the actual repair, maintenance, renovation, remodeling,

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    by various state or federal agencies (including the State Division of Capital Asset Management - DCAM), union agreements, state or federal statues, local ordinances, and requirements imposed by other regulatory agencies, fabrication, installation, or alteration of utility service systems including electrical, gas, water, sewer

  14. E-Print Network 3.0 - aircraft maintenance repair Sample Search...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Soviet Source: Fuerschbach, Phillip - Joining and Coating Department, Materials and Process Sciences Center, Sandia National Laboratories Collection: Materials Science 100...

  15. Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao

    E-Print Network [OSTI]

    Marcus, Steven I.

    Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao SAS Institute Inc. Cary preventive maintenance (PM) and production policies for an unreliable production-inventory system in which to establish some additional structural properties. Keywords: optimal preventive maintenance, joint maintenance

  16. A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling Problem in the Robustness

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling production and Preventive Maintenance (PM) scheduling problem in the robustness framework. The contributions equipment reliability and performance loss under disruption Key words: Production, Preventive maintenance

  17. Role of DNA repair protein ERCC1 in skin cancer 

    E-Print Network [OSTI]

    Song, Liang

    2009-01-01T23:59:59.000Z

    Nucleotide excision repair (NER) is one of the major repair systems for removal of DNA lesions. The NER pathway has evolved mainly to repair UV-induced DNA damage and is also active against a broad range of endogenously ...

  18. Automotive Repair by Number Theory Bart Snapp and Chris Snapp

    E-Print Network [OSTI]

    Snapp, Bart

    Automotive Repair by Number Theory Bart Snapp and Chris Snapp While repairing the ignition switch on a 1981 Fiat Spider, we discovered the following connection between number theory and automotive repair

  19. The feasibility of electrophoretic repair of impoundment leaks

    E-Print Network [OSTI]

    Han, Ji-Seok

    2002-01-01T23:59:59.000Z

    finding, repairing and testing the leaks, are tedious, expensive, and dangerous to workers. Electrophoretic repair technique is an innovative, economic, and safe method to repair the leakage of impoundments. A suspension of clay particles is induced...

  20. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2012-09-01T23:59:59.000Z

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  1. Development and testing of a low-maintenance, energy-absorbing bridge rail

    E-Print Network [OSTI]

    Cain, John Craig

    1985-01-01T23:59:59.000Z

    vehicle leaves the flow of traffic and strikes a bridge rail. The second concern is for the safety of the maintenance workers who must repair bridge rail damage following a collision. Third, the increasing cost of maintaining br idge decks and rails... during a more severe collision. Furthermore, the new bridge rail is designed to fit either new or existing standard bridge decks. Following development of the new bridge rail, two full-scale vehicle crash-tests were performed at the TTI Research...

  2. INTERNAL REPAIR OF PIPELINES REVIEW & EVALUATION OF INTERNAL PIPELINE REPAIR TRIALS REPORT

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-09-01T23:59:59.000Z

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is generally ineffective at restoring the pressure containing capabilities of pipelines. Failure pressure for pipe repaired with carbon fiber-reinforced composite liner was greater than that of the un-repaired pipe section with damage, indicating that this type of liner is effective at restoring the pressure containing capability of pipe. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the next phase of this project.

  3. BPAT Systems Maintenance - February 9, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 292015 BPAT's...

  4. BPAT Systems Maintenance - December 12, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 12122014 BPAT's...

  5. BPAT Systems Maintenance - November 5, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 1152014 BPAT's...

  6. FAQS Reference Guide – Facility Maintenance Management

    Broader source: Energy.gov [DOE]

    This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

  7. Scheduling with Fixed Maintenance, Shared Resources and ...

    E-Print Network [OSTI]

    Christina N Burt

    2014-11-30T23:59:59.000Z

    Nov 30, 2014 ... Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: a Mine Planning Case Study. Christina N Burt ...

  8. Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker

    E-Print Network [OSTI]

    Natti, Satish

    2010-01-14T23:59:59.000Z

    is carried to understand the importance of model parameters in obtaining optimal maintenance strategies. The analysis covers the effect of inspection rate calculated for each stage and its impact on failure probability, inspection cost, maintenance cost...

  9. Section 6 -Facilities Usage and Maintenance A. Facilities Usage and Maintenance

    E-Print Network [OSTI]

    Pantaleone, Jim

    Section 6 - Facilities Usage and Maintenance A. Facilities Usage and Maintenance 1 be held financially responsible. Financial responsibility extends to abandoned belongings, excessive is not permitted under any circumstances. Storage facilities are provided in most student housing units for storing

  10. Vehicle Maintenance Procedure Outline the procedure for vehicle maintenance at University of Michigan (U-M).

    E-Print Network [OSTI]

    Kirschner, Denise

    Vehicle Maintenance Procedure Objective Outline the procedure for vehicle maintenance at University of Michigan (U-M). Procedure 1. Your U-M vehicle has a mechanical and/or safety issue. 2. Contact Garage of the vehicle or if needed, have the vehicle towed to the maintenance facility. 4. If a loaner is needed while

  11. Void Fraction Instrument operation and maintenance manual

    SciTech Connect (OSTI)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

    1994-09-01T23:59:59.000Z

    This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

  12. Software Testing and Maintenance 1 Regression Testing

    E-Print Network [OSTI]

    Lei, Jeff Yu

    1 Software Testing and Maintenance 1 Regression Testing Introduction Test Selection Test Minimization Test Prioritization Summary Software Testing and Maintenance 2 What is it? Regression testing refers to the portion of the test cycle in which a program is tested to ensure that changes do not affect

  13. Functional Prognostic Architecture for the Maintenance of Complex Systems

    E-Print Network [OSTI]

    Pencolé, Yannick

    their functions by new ones. In order to optimize the maintenance cost, it is necessary to perform preventive maintenance to prevent failure occur- rence. Preventive maintenance actions consist in replacing components the date of the next scheduled maintenance phase. In the classical case, preventive maintenance is only

  14. Diagnosis and prognosis for the maintenance of complex systems

    E-Print Network [OSTI]

    Pencolé, Yannick

    --Diagnosis, prognosis, preventive maintenance, complex systems. I. INTRODUCTION Nowadays, system maintenance is a key to decrease the maintenance cost, it is necessary to perform preventive maintenance [3], [4], [5] which alsoDiagnosis and prognosis for the maintenance of complex systems Pauline Ribot1,2 , Yannick Pencol´e1

  15. CATASTROPHIC REPAIR REQUEST CHECKLIST Office of Research

    E-Print Network [OSTI]

    Schladow, S. Geoffrey

    Not Meet Policy Not Sure Equipment may not be covered by a service contract that provides for repair Contacted: ______________ Amount of Annual Service Contract: $ ___________ Meets Policy Info Pending Does

  16. Vehicle Repair Policy Outline the policy regarding vehicle repair on University of Michigan (U-M) vehicles.

    E-Print Network [OSTI]

    Kirschner, Denise

    Vehicle Repair Policy Objective Outline the policy regarding vehicle repair on University of Michigan (U-M) vehicles. Policy 1. All vehicle repairs performed on U-M vehicles must be coordinated facility to repair their fleet vehicles. 2. U-M vehicles leased through Fleet Services include routine

  17. Optimization models for improving periodic maintenance schedules by utilizing opportunities

    E-Print Network [OSTI]

    Patriksson, Michael

    to this as preventive maintenance activities at an oppor- tunity. The original opportunistic replacement problemOptimization models for improving periodic maintenance schedules by utilizing opportunities Torgny of Technology Abstract We present mathematical models for finding optimal opportunistic maintenance schedules

  18. Modelling maintenance for components under competing risk Helge Langseth

    E-Print Network [OSTI]

    Langseth, Helge

    preventively maintained. The preventive maintenance (PM) is performed periodically with some period , but PMModelling maintenance for components under competing risk Helge Langseth Norwegian University the mathematical modelling of imperfect maintenance of a system under competing risk. The model we propose

  19. Condition-Based Maintenance via Simulation and a Targeted Bayesian

    E-Print Network [OSTI]

    Ben-Gal, Irad E.

    malfunctioning. Accordingly, it is essential to undertake an effective preventive maintenance (PM) policyCondition-Based Maintenance via Simulation and a Targeted Bayesian Network Metamodel Aviv Gruber, Israel ABSTRACT Condition-based maintenance (CBM) is increasingly applied to operational systems

  20. Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO)

    E-Print Network [OSTI]

    Florida, University of

    , Limited Commercial Landscape Maintenance, Ornamental & Turf, Private Ag, or General Standards CORE for Limited Commercial Landscape Maintenance (LCLM), you must attend all day to earn the 6 CEUs required. Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO) Training & Exams Date

  1. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01T23:59:59.000Z

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  2. CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...

    Broader source: Energy.gov (indexed) [DOE]

    Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of...

  3. CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...

    Broader source: Energy.gov (indexed) [DOE]

    Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR...

  4. FY 2014 Real Property Data Related to Operations and Maintenance...

    Office of Environmental Management (EM)

    FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY2014DataRelatedtoOperatio...

  5. Project Profile: Innovative Application of Maintenance-Free Phase...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Systems Project Profile: Innovative Application of Maintenance-Free Phase-Change Thermal...

  6. A case model for predictive maintenance

    E-Print Network [OSTI]

    Li, Jiawei, M. Eng. Massachusetts Institute of Technology

    2008-01-01T23:59:59.000Z

    This project is to respond to a need by Varian Semiconductor Equipment Associates, Inc. (VSEA) to help predict failure of ion implanters. Predictive maintenance would help to reduce the unscheduled downtime of ion implanters, ...

  7. Maintenance expo................... 3 Georgia visitors....................... 3

    E-Print Network [OSTI]

    Minnesota, University of

    Inside · Maintenance expo................... 3 · Georgia visitors....................... 3 · Fluid Power Center ................ 4 · CTS services Web page .......... 4 A monthly report on transportation transformation of nation's transportation policy The results of a 13-month study led by David Kittelson

  8. Risk impact of maintenance program changes

    E-Print Network [OSTI]

    Credit, Kimberly A. (Kimberly April)

    1992-01-01T23:59:59.000Z

    This study quantifies the change in one measure of plant risk, the frequency of loss of long-term decay heat removal, due to changes in maintenance at the James A. Fitzpatrick (JAF) plant. Quantification is accomplished ...

  9. Operations and Maintenance for Major Equipment Types

    Broader source: Energy.gov [DOE]

    Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

  10. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    wind industries, and significant first-hand knowledge of offshore installation, operation and maintenance (IO&M) activities. The aim of the GL GH study was to enable project...

  11. Significantly reduce maintenance time Documents&Mediabecomesthekey

    E-Print Network [OSTI]

    Mullins, Dyche

    Significantly reduce maintenance time · Documents&Mediabecomesthekey contactforallmaintenanceneeds. · MajorpartsarestoredbyDocuments& MediaattheMissionCenter.Thisreduces thetimeneededtoorderpartsandresultsin&Mediaoffersthecampus communityaconvenientandeconomicsolution foritscopiers,multifunctiondevicesandprinter needs. Print Management Program advantages Reduce

  12. E-Print Network 3.0 - annular repair strategies Sample Search...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - lowing a user to create custom repair strategies. ReAssert used a five-step repair process around its... library of repair ... Source: Marinov, Darko - Department of...

  13. Pressure maintenance in a volatile oil reservoir

    E-Print Network [OSTI]

    Schuster, Bruce Alan

    1989-01-01T23:59:59.000Z

    PRESSURE MAINTENANCE IN A VOLATILE OIL RESERVOIR A Thesis BRUCE ALAN SCHUSTER Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May, 1989 Major... Subject: Petroleum Engineering PRESSURE MAINTENANCE IN A VOLATILE OIL RESERVOIR A Thesis BRUCE ALAN SCHUSTER Approved as to style and content by: S. A. Holditch (Chair of Committee) W. J. Lee (Member) R. R, Berg (Member) , Jz W. D. Von Gonten...

  14. Thermography for Preventive Maintenance and Conservation

    E-Print Network [OSTI]

    Lopez, T.

    1979-01-01T23:59:59.000Z

    THERMOGRAPHY FOR PREVENTIVE MAINTENANCE AND CONSERVATION Tony Lopez Southern California Gas Company Los Angles, California The Supply Situation With fuel prices soaring, more and more companies are looking at energy management as a means... years. In the last twenty years, however, other applica tions have been developed for thermography. Some of these include: medicine, nondestructive testi:ng, aerial land mapping, preventive maintenance and conservation. The balance of this paper...

  15. Optimal Preventive Maintenance Under Decision Dependent Uncertainty

    SciTech Connect (OSTI)

    Galenko, Alexander; Popova, Elmira [University of Texas at Austin, 1 University Station, Austin, Texas 78712 (United States); Kee, Ernie; Grantom, Rick [South Texas Project Nuclear Operating Company - STPNOC, P.O. Box 289, Wadsworth, Tx 77483 (United States)

    2006-07-01T23:59:59.000Z

    We analyze a system of N components with dependent failure times. The goal is to obtain the optimal block replacement interval (different for each component) over a finite horizon that minimizes the expected total maintenance cost. In addition, we allow each preventive maintenance action to change the future joint failure time distribution. We illustrate our methodology with an example from South Texas Project Nuclear Operating Company. (authors)

  16. Environmental assessment for the Plating Shop Replacement, Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1992-03-01T23:59:59.000Z

    The existing of Y-12 Plant Plating Shop provides vital support functions for the US Department of Energy (DOE) Defense Programs operations. In addition to weapon component plating, the facility performs other plating services to support existing operations for the Y-12 Plant, other DOE facilities, and other federal agencies. In addition, the facility would also provide essential deplating services for weapons reclamation and teardown. The existing Y-12 Plant Plating Shop is presently located in a structure which is rapidly deteriorating and obsolete. The existing building structure was originally designed to house a steam plant, not chemical plating operations. As such, vapors from plating operations have deteriorated the structure to a point where a new facility is needed for continued safe operations. The potential environmental impacts of the proposed action was anticipated to be minimal and would affect no environmentally sensitive areas. Some short-term construction- and demolition-related effects would occur in an already highly industrialized setting. These include temporarily disturbing 72,000 square feet of land for the new plating shop and related site preparation activities, constructing a permanent building on part of the area, and using 80 construction personnel over a period of 18 months for site preparation and construction. Demolition effects vary depending on the environmentally suitable option selected, but they could involve as much as 262 cubic yards of concrete rubble and approximately 1600 cubic yards of soil disposed as waste. Either 1600 cubic yards of fresh soil or 1850 yards of clay and fresh soil could be required. Soil erosion would be minimal. Approximately 20 construction personnel would be involved for 12 months in demolition activities.

  17. Selective batch crushing in the coal-preparation shop at OAO NTMK

    SciTech Connect (OSTI)

    N.A. Berkutov; Yu.V. Stepanov; P.V. Shtark; L.A. Makhortova; N.K. Popova; D.A. Koshkarov; N.V. Tsarev [OAO Nizhnetagil'skii Metallurgicheskii Kombinat (NTMK)(Russian Federation)

    2007-05-15T23:59:59.000Z

    In September 2004, after reconstruction at OAO Nizhnetagil'skii Metallurgicheskii Kombinat (NTMK), blast furnace 6 went into operation for the production of vanadium from hot metal. At the startup of furnace 6, besides optimising its composition; it was decided to restore selective crushing of the coal batch using pneumatic and mechanical separation in the third unit of the coal preparation shop. Additional increase in the mechanical strength of coke by 1.5-2.0% was predicted with a 0.5-1.0% decrease in wear.

  18. Fabrication Flaws in Reactor Pressure Vessel Repair Welds

    SciTech Connect (OSTI)

    Schuster, George J.; Doctor, Steven R.

    2007-12-01T23:59:59.000Z

    This paper describes the fabrication flaw distribution and characterization in the repair weld metal of reactor pressure vessels. This work indicates that the large flaws occur in these repairs. These results show that repair flaws are complex in composition and sometimes include cracks on the repair ends. Parametric analysis using an exponential fit is performed on the data. A description of repair flaw morphology is provided. Fabrication flaws in repairs are characterized using high sensitivity nondestructive ultrasonic testing, validation by other nondestructive evaluation (NDE) techniques, and complemented by destructive testing.

  19. INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY 2005

    SciTech Connect (OSTI)

    D. R. Fitch

    2005-09-22T23:59:59.000Z

    This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during fiscal year 2005. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document. Waste Area Groups 7 and 8 are not reported in this document. Waste Area Group 7 is an operating facility, and the status of its operations is reported directly to the regulatory agencies. Waste Area Group 8 is excluded from this report, because it falls outside the direct control of U.S. Department of Energy Idaho Operations Office. The INEEL Sitewide Institutional Controls Plan discusses the inspection, maintenance, repair, and reporting activities involving institutional controls at the Idaho National Laboratory Site. Therefore, the maintenance of institutional controls is not discussed in this report. The Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan provides a reference to support this report by providing current and projected facility and land uses and by listing the Comprehensive Environmental Response, Compensation, and Liability Act sites.

  20. Regular Inspection and Maintenance Guidance for Porous Pavements

    E-Print Network [OSTI]

    non-design loads. Damaged areas may be repaired by use of infrared heating and rerolling of pavement

  1. Repairable chip bonding/interconnect process

    DOE Patents [OSTI]

    Bernhardt, Anthony F. (Berkeley, CA); Contolini, Robert J. (Livermore, CA); Malba, Vincent (Livermore, CA); Riddle, Robert A. (Tracy, CA)

    1997-01-01T23:59:59.000Z

    A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder.

  2. Repairable chip bonding/interconnect process

    DOE Patents [OSTI]

    Bernhardt, A.F.; Contolini, R.J.; Malba, V.; Riddle, R.A.

    1997-08-05T23:59:59.000Z

    A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules is disclosed. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder. 10 figs.

  3. Towards a maintenance and servicing indicator Pascal Vrignat 1

    E-Print Network [OSTI]

    Boyer, Edmond

    : Preventive Maintenance, Maintenance planning, Hidden Markov Model, Failure detection. 1 Introduction, events may be prevented by applying a correct maintenance policy. Some tankers may not have sunk if some maintenance had been correctly applied. Factory should not have exploded with some preventive control

  4. Kernel spectral clustering for predicting maintenance of industrial machines

    E-Print Network [OSTI]

    to deal with sensory faults have been used [1],[2],[3]: corrective maintenance, preventive maintenance the machine fails, it is expensive and safety and environment issues arise. Preventive maintenance is basedKernel spectral clustering for predicting maintenance of industrial machines Rocco Langone1, Carlos

  5. Grouping maintenance strategy with availability constraint under limited

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    with significant assumptions: maintenance durations are neglected and only one preventive maintenance for eachGrouping maintenance strategy with availability constraint under limited repairmen Phuc Do Van Hai maintenance strategies of multi-component systems by integrating two efficient optimization algorithms

  6. Maintenance and long life of manjemen & pengelolaan dan

    E-Print Network [OSTI]

    Stoffelen, Ad

    : SACA&D Maintenance ­ p.6 #12;ensure operability What does this mean? · preventive maintenanceMaintenance and long life of SACA&D manjemen & pengelolaan dan umur panjang Gerard van der Schrier KNMI BMKG: SACA&D Maintenance ­ p.1 #12;Why SACA&D extreme weather and food security Jakarta Post, 10

  7. Comparison of Selected Model Evaluation Criteria for Maintenance Applications

    E-Print Network [OSTI]

    Huang, Samuel H.

    , Louisville, KY 40292, USA Model-based preventive maintenance relies on creating models that can either loss, and as a whole a sluggish system, the focus has shifted to preventive maintenance. Computerized maintenance systems aid in improving the efficiency of maintenance tasks [28]. The approach of preventive

  8. Optimal Maintenance Scheduling of a Gas Engine Power Plant

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    to carry out preventive maintenance at regular intervals19 . The maintenance schedule affects many short1 Optimal Maintenance Scheduling of a Gas Engine Power Plant using Generalized Disjunctive with parallel units. Gas engines are shutdown according to a regular maintenance plan that limits the number

  9. University Marketing Communications UMC Web Site Maintenance Service

    E-Print Network [OSTI]

    Sibille, Etienne

    University Marketing Communications UMC Web Site Maintenance Service Overview Content management and ongoing Web site maintenance is an essential part of any Web project plan. When developing a new Web site in Web maintenance activities. Benefits Our Web maintenance service gives you ongoing access to our group

  10. Development of a composite repair system for reinforcing offshore risers

    E-Print Network [OSTI]

    Alexander, Christopher Richard

    2009-05-15T23:59:59.000Z

    A research program was conducted to investigate the application of composite materials in repairing corroded offshore risers, leading to the development of an optimized repair using a hybrid carbon/E-glass system. The objective of this research...

  11. Phonemic Categorization and Phonotactic Repair as Parallel Sublexical Processes 

    E-Print Network [OSTI]

    Ishikawa, Kiyoshi

    2014-07-01T23:59:59.000Z

    categorization and phonotactic repair are sublexical and simultaneous; phonotactic repairs themselves depend on coarticulation cues. Such models can be implemented in two different versions: suprasegmental matching, according to which a speech signal is matched...

  12. maintenance. This research is relevant to opera-tions and maintenance challenges facing aging

    E-Print Network [OSTI]

    the need for preventive maintenance or other diagnostic activities on the physical system. Simulationsmaintenance. This research is relevant to opera- tions and maintenance challenges facing aging-benefit of extending the time between overhauls. reducing the probability of a failure in the field. and preventive

  13. Window shopping

    SciTech Connect (OSTI)

    Best, D.

    1990-03-01T23:59:59.000Z

    The author addresses the energy efficiency of windows and describes changes and new products available in this consumer information article. Experiments currently being done by Lawrence Berkeley Laboratory (LBL), Bonneville Power Authority and the Washington State Energy Office show that some of these superwindows collect more energy from the sun than they let escape from inside the home. One type of window in current production is the low-E (low-emissivity) and the IGUs (insulated glass units). Low-E techniques include glazing of the glass with various materials including polyester and metallic coatings. Other measures include filling the airspace in double pane windows with argon, aerogel or by creating a vacuum in the airspace. Another factor the author considers is ultraviolet light protection.

  14. Repairable File and Storage Systems A Dissertation Presented

    E-Print Network [OSTI]

    Chiueh, Tzi-cker

    Repairable File and Storage Systems A Dissertation Presented by Ningning Zhu to The Graduate School of the Dissertation Repairable File and Storage System by Ningning Zhu Doctor of Philosophy in Computer Science Stony stream file/storage system. Repairable file/storage system needs to perform two tasks. First it has

  15. Apply reliability centered maintenance to sealless pumps

    SciTech Connect (OSTI)

    Pradhan, S. (Exxon Chemicals Canada, Ontario (Canada))

    1993-01-01T23:59:59.000Z

    This paper reports on reliability centered maintenance (RCM) which is considered a crucial part of future reliability engineering. RCM determines the maintenance requirements of plants and equipment in their operating context. The RCM method has been applied to the management of critical sealless pumps in fire/toxic risk services, typical of the petrochemical industry. The method provides advantages from a detailed study of any critical engineering system. RCM is a team exercise and fosters team spirit in the plant environment. The maintenance strategy that evolves is based on team decisions and relies on maximizing the inherent reliability built into the equipment. RCM recommends design upgrades where this inherent reliability is being questioned. Sealless pumps of canned motor design are used as main reactor charge pumps in PVC plants. These pumps handle fresh vinyl chloride monomer (VCM), which is both carcinogenic and flammable.

  16. A Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL-MORELLO*, Noureddine ZERHOUNI*

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    - ing to different strategies (preventive maintenance, predictive maintenance, correc- tive maintenanceA Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL of information and communication technol- ogies has resulted in a variety of maintenance support systems

  17. Visualization of Mismatch Repair in Bacterial Cells

    E-Print Network [OSTI]

    Smith, Bradley T.

    We determined the localizations of mismatch repair proteins in living Bacillus subtilis cells. MutS-GFP colocalized with the chromosome in all cells and formed foci in a subset of cells. MutL-GFP formed foci in a subset ...

  18. Method for mask repair using defect compensation

    DOE Patents [OSTI]

    Sweeney, Donald W. (San Ramon, CA); Ray-Chaudhuri, Avijit K. (Livermore, CA)

    2001-01-01T23:59:59.000Z

    A method for repair of amplitude and/or phase defects in lithographic masks. The method involves modifying or altering a portion of the absorber pattern on the surface of the mask blank proximate to the mask defect to compensate for the local disturbance (amplitude or phase) of the optical field due to the defect.

  19. EPA Lead Safety for Renovation, Repair and

    E-Print Network [OSTI]

    Tennessee, University of

    than 20 f lead-based paint is dis- e exterior. Window replace- onsidered minor mainte- air. If you're of thousands of dollars in fines and put yourself and your company at risk of po- tential lawsuits. 2. ProtectEPA Lead Safety for Renovation, Repair and Painting (RRP) Course Certified Renovators Class

  20. Repairing Type Errors in Functional Programs 

    E-Print Network [OSTI]

    McAdam, Bruce J

    Type systems for programming languages can be used by compilers to reject programs which are found to be unsound and which may, therefore, fail to execute successfully. When a program is rejected the programmer must repair it so that it can be type...

  1. An emergency response team for membrane repair

    E-Print Network [OSTI]

    Kirchhausen, Tomas

    events, which we focus on here. As discussed later, Ca2+ influx at the site of plasma membrane-fusion events are required to repair a torn plasma membrane, and we propose that this emergency products and the plasma membrane. Reseal or die. Plasma-membrane disruption is a normal event in the life

  2. Maintenance strategies to improve sootblower availability

    SciTech Connect (OSTI)

    Walther, J.M.; Whitehead, B.K.

    1996-07-01T23:59:59.000Z

    Sootblowers are electromechanical devices used for removal of ash and slag deposits from boiler tube surfaces. By directing steam, air, or water cleaning medium through a nozzle to remove deposits from boiler tubes, boilers are kept on-line for longer periods of time reducing the need for outages to clean the boiler by mechanical means. Fuel must be burned efficiently to minimize stagging and fouling of the heat transfer surfaces. Tuning the boiler to maximize combustion efficiency should not be limited to optimizing fuel conditions, air-fuel ratios, firing rates, excess air, and over-fire air, but should also include the use of sootblowers. The goal is to know when to clean, and if the cleaning cycle has effectively removed the deposit and increased heat transfer. Today, boiler cleaning technology not only focuses on the impact of the sootblowing system on overall boiler performance, but it also focuses on design improvements that impact an individual sootblower`s performance. Proper sootblower maintenance is an integral part of making existing designs and new designs work. Existing computer technologies provide a viable means of documenting and trending sootblower performance data and maintenance history. The personal computer and the availability of spreadsheet and database software make the task of quantifying sootblower performance data and maintenance history easier to achieve. The difficult task is gathering the proper data to make decisions about sootblowing operations and maintenance. The balance of this paper will discuss typical maintenance practices, and improvements that can be achieved by documenting sootblowing system inspections and maintenance activity using a personal computer database.

  3. Steam Trap Maintenance as a Profit Center

    E-Print Network [OSTI]

    Bouchillon, J. L.

    the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 EXCUSES Everybody thinks his or her steam trap maintenance is good. Surveysl have shown the following are the most popular excuses encountered when managers are confronted... for steam traps. 192 ESL-IE-96-04-28 Proceedings from the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 5. Set up a trap maintenance program C. Prepare and present a report to that will: management on the results...

  4. Laboratory testing of closure cap repair techniques

    SciTech Connect (OSTI)

    Persoff, P.; Moridis, G. [Lawrence Berkeley National Lab., CA (United States); Tuck, D.M. [Westinghouse Savannah River Company, Aiken, SC (United States)] [and others

    1996-10-01T23:59:59.000Z

    Landfill design requires a low permeability closure cap as well as a low permeability liner. The Savannah River Site, in South Carolina, has approximately 85 acres of mixed waste landfills covered with compacted kaolin clay. Maintaining low permeability of the clay cap requires both that the permeability of the compacted clay itself remain low and that the integrity of the barrier be maintained. Barrier breaches typically result from penetration by roots or animals, and especially cracks caused by uneven settling or desiccation. In this study, clay layers, 0.81 m in diameter and 7.6 cm thick, were compacted in 7 lysimeters to simulate closure caps. The hydraulic conductivity of each layer was measured, and the compacted clay layers (CCL`s) were cracked by drying. Then various repair techniques were applied and the effectiveness of each repair was assessed by remeasuring the hydraulic conductivity. Finally the repaired CCL was again dried and measured to determine how the repair responded to the conditions that caused the original failure. For a full report of this investigation see Persoff et al. Six repair techniques have been tested, four of which involve the use of injectable barrier liquids colloidal silica (CS) and polysiloxane (PSX) described below: (I) covering the crack with a bentonite geosynthetic clay liner (GCL), (ii) recompaction of new kaolinite at STD+3 moisture content joined to existing kaolinite that had dried and shrunk, (iii) direct injection of colloidal silica to a crack, (iv) injection of colloidal silica (CS) to wells in an overlying sand layer, (v) direct injection of polysiloxane to a crack, and (vi), injection of polysiloxane (PSX) to wells in an overlying soil layer.

  5. ICD Complex Operations and Maintenance Plan

    SciTech Connect (OSTI)

    Gibson, P. L.

    2007-06-25T23:59:59.000Z

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  6. Facilities Cost Pool: Maintenance Service Responsibilities

    E-Print Network [OSTI]

    Gulliver, Robert

    C 16 EXTERIOR LANDSCAPING University Standard FM FM C 17 EXTERIOR STD BUILDING SIGNS FM FM FM FM FMD 22 DATA POINT MONITORING Environmental building standard FM FM C Cost Pool: Maintenance Service Responsibilities 2 Table of Contents 3 Building Shell

  7. Wind Energy Facility Reliability and Maintenance

    E-Print Network [OSTI]

    Ding, Yu

    Wind Energy Facility Reliability and Maintenance Eunshin Byon, Lewis Ntaimo, Chanan Singh and Yu related to wind energy facility reliability and mainte- nance focused more on qualitative aspects. In this chapter, we provide a comprehensive account of the existing research regarding wind energy facility

  8. Reliable Link Maintenance in Cognitive Radio Systems

    E-Print Network [OSTI]

    Gross, James

    resources and overcome the under-utilization of licensed spectrum. Since the licensed user still keeps) have to vacate the spectrum in case the licensed user claims it. In order to maintain the qualityReliable Link Maintenance in Cognitive Radio Systems Daniel Willkomm, James Gross and Adam Wolisz

  9. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    SciTech Connect (OSTI)

    Poderis, Reed J. [NSTec] [NSTec; King, Rebecca A. [NSTec] [NSTec

    2013-09-30T23:59:59.000Z

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or documented ? Provides instructions for implementing annual S&M inspections and activities The following facilities that were included in Revision 1 of this plan have reached final disposition and are no longer in the S&M program: ? Reactor Maintenance, Assembly, and Disassembly Facility, Building 25-3110 ? Test Cell A Facility, Building 25-3113 ? TCC Facility, Building 25-3210 ? Pluto Disassembly Facility, Building 26-2201 ? Super Kukla Facility, Building 27-5400

  10. Energy Conservation Thru Steam Trap Surveys and Preventive Maintenance Programs

    E-Print Network [OSTI]

    Boynton, T.; Dewhirst, B.

    1980-01-01T23:59:59.000Z

    ENERGY CONSERVATION THRU STEAM TRAP SURVEYS AND PREVENTIVE MAINTENANCE PROGRAMS Terry Boynton, Armstrong, Three Rivers, Mich. Bob Dewhirst, Armstrong, New Braunfels, Texas. This paper will deal with steam trap surveys and preventive maintenance...

  11. WINCO maintenance before and after DOE 4330.4A

    SciTech Connect (OSTI)

    Remsburg, R.E.

    1993-04-27T23:59:59.000Z

    This report discusses numerous elements of the maintenance program at the Idaho Chemical Processing Plant (ICPP) which have undergone changes during the last 5 years. Looking back, many of the maintenance program changes prior to 1991 were fragmented. Maintenance program elements were being ratcheted to address specific productivity and safety concerns. The improvements were warranted, but often improvements were implemented without a systematic review of how they impacted other maintenance program elements. After 1990 when WINCO began using the Chapter II guidelines of DOE Order 4330.4A as a maintenance program model, there was a marked improvement in the quality of the maintenance program changes. The post 1990 changes have been part of a systematic plan that has been communicated to all of the maintenance players. The Chapter II guidelines and the maintenance implementation plan (MIP) personnel with a focus for improvement that was missing prior to 1991.

  12. Operations & Maintenance Best Practices Guide: Release 3.0

    Broader source: Energy.gov [DOE]

    Guide covers version 3.0 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  13. E-Print Network 3.0 - analyzing maintenance strategies Sample...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OR I GI NAL AR T I C LE Summary: OSA-CBM Preventive maintenance Reliability-centered maintenance 1 Maintenance strategies... and motivations for health monitoring The...

  14. A MAINTENANCE MODEL FOR COMPONENTS EXPOSED TO SEVERAL FAILURE MECHANISMS

    E-Print Network [OSTI]

    Langseth, Helge

    . The preventive maintenance (PM) is performed periodically with some fixed period , but PM can also be performed describe the "goodness" of the maintenance crew; their ability to prevent failures by performing thorough is assumed to undergo preventive maintenance (PM), usually at fixed time periods > 0. In addition

  15. Maintenance policy: degradation laws versus Hidden Markov Model availability indicator

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    INTRODUCTION Industrial processes need to be maintained to prevent breakdown. Some years ago, maintenance, logistic... Different kinds of maintenance policy can be applied: preventive or corrective according to manager strategies. In case of preventive maintenance, different strategies should be used like planned

  16. `ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES

    E-Print Network [OSTI]

    Boyer, Edmond

    part (McCall, 1963). Then an opportunistic maintenance is any action that combines a preventive`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES E. Levrat, E Vandoeuvre (France) Abstract: Today, a new role for maintenance exists to enhance the eco

  17. Commencement Activities & Facility Maintenance Closures Updated Monday 4/29

    E-Print Network [OSTI]

    von der Heydt, RĂĽdiger

    · Fitness Center & Weight Room equipment cleaning, preventive maintenance, and layout changes #12;Commencement Activities & Facility Maintenance Closures Updated Monday 4/29 Spring Semester Normal Maintenance projects. · The Rec Center will be closed Monday 5/20 ­ Sunday 6/9. · The Rec Center reopens

  18. Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies

    E-Print Network [OSTI]

    Terwilliger, Mark

    Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies ABSTRACT Heavy of minimizing the makespan for a set of preventive maintenance (PM) tasks, requiring single- or multiple approach to the SA approach for this class of PM problems. Subject Area: Preventive Maintenance, Evolution

  19. Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1

    E-Print Network [OSTI]

    Watson, Craig A.

    when the need is discovered, but a good preventive maintenance program will reduce the number. This fact sheet will emphasize corrective and preventive maintenance procedures for ventilation, evaporativeAE26 Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1 D. E

  20. Probabilistic service life prediction and maintenance planning of deteriorating structures

    E-Print Network [OSTI]

    Garavaglia, Elsa

    life prediction of a bridge pier and to the selection of a suitable preventive maintenance scenario. 1 with an aggressive environment, and to eventually plan a process of essential and/or preventive maintenance, some preventive maintenance scenario. 2 RELIABILITY OF DETERIORATING STRUCTURAL SYSTEMS The deterioration

  1. Optimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective

    E-Print Network [OSTI]

    Boyer, Edmond

    . Numerical examples have shown that our model provides a preventive maintenance policy that slows downOptimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective Mariem Zouch, Thomas Yeung / IRCCyN, F-44307 NANTES Cedex, France Keywords: Road deterioration, maintenance optimization, Partially

  2. Optimal Maintenance Scheduling of a Power Plant with Seasonal

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    -Wide Optimization Meeting · Plan preventive maintenance shutdowns ­ Minimize payment for skilled labor ­ Save onlineOptimal Maintenance Scheduling of a Power Plant with Seasonal Electricity Tariffs Pedro M. Castro maintenance team doing shutdowns · Shutdown period mandatory after [ , ] h online · Challenging (hard

  3. IEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind

    E-Print Network [OSTI]

    Ntaimo, Lewis

    from sensors, our research objective is to derive an optimal observation and preventive maintenance TRANSACTIONS ON RELIABILITY 3 ACRONYMS NA no action PM preventive maintenance OB observation CM correctiveIEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind Turbine Systems Under

  4. Single-machine Multiple-recipe Predictive Maintenance , John Hasenbein

    E-Print Network [OSTI]

    Hasenbein, John

    preventative and corrective maintenance costs, holdings costs, and possibly production costs. An optimal policy. In a conventional preventive maintenance policy, it is typically assumed that the decision maker knows only when, conventional preventive maintenance policies are often one of two types: calendar-based or job

  5. Experiment #1 Maintenance of UV/vis Instruments

    E-Print Network [OSTI]

    Nazarenko, Alexander

    considerably worse than it should be. For these reasons, most companies have a preventive maintenance program that might be included in a preventive maintenance program for a UV-visible spectrometer. Your taskExperiment #1 Maintenance of UV/vis Instruments Objectives: 1. Learn how to use different UV

  6. Analysis of Preventive Maintenance in Transactions Based Software Systems

    E-Print Network [OSTI]

    Telek, MiklĂłs

    Analysis of Preventive Maintenance in Transactions Based Software Systems Sachin Garg 1 , Antonio''. However, it incurs some overhead. The necessity to do preventive maintenance not only in general purpose to illustrate the usefulness and applicability of the models. Keywords: Preventive Maintenance, Transactions

  7. Maintenance Approaches For ARIES-CS Power Core

    E-Print Network [OSTI]

    of Fusion Energy September 14-16, 2004 Madison, WI #12;2 Outline Introduction Reactor parameters Maintenance approach based on field-period units Modular maintenance approach through selected ports Maintenance approach with ports between all the modular coils Summary and conclusion #12;3 Introduction The engineering

  8. Software Maintenance and Evolution: Keith Bennett & Vaclav Rajlich

    E-Print Network [OSTI]

    for change and improvements. Our aim is to describe a landscape for research in software maintenanceSoftware Maintenance and Evolution: A Roadmap Keith Bennett & Vaclav Rajlich Key Research Pointers transformation techniques. He is a founding co-Director of the Centre for Software Maintenance at Durham

  9. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13T23:59:59.000Z

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  10. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21T23:59:59.000Z

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  11. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21T23:59:59.000Z

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Cancels DOE O 433.1A. Admin Chg 1, dated 3-12-2013, cancels DOE O 433.1B.

  12. RTE.ie News Sport Business Entertainment Television Radio RT Aertel Performing Groups RT Guide About Mobile Edition Fashion Food Motors Jobs Travel Property Shop Weather Live TV

    E-Print Network [OSTI]

    Sóbester, András

    About Mobile Edition Fashion Food Motors Jobs Travel Property Shop Weather Live TV Search Search Web of the Middle East, particularly the likes of Saudi Arabia, the picture we get in our heads is one

  13. Review of maintenance personnel practices at nuclear power plants

    SciTech Connect (OSTI)

    Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

    1984-05-01T23:59:59.000Z

    As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations.

  14. Waste Sampling and Characterization Facility (WSCF). Maintenance Implementation Plan

    SciTech Connect (OSTI)

    Bozich, J.L.

    1993-07-01T23:59:59.000Z

    This Maintenance Implementation Plan has been developed for maintenance functions associated with the Waste Sampling and Characterization Facility (WSCF). This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4A guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at WSCF.

  15. Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid-Linear Model, Expert Opinion, Complexity Reduction, Maintenance. 1 Introduction Preventive maintenance became essential. Preventive maintenance of a system is taking into account expert knowledge, feedback

  16. Maintenance decision making tool reaching a compromise between maintainability and reliability performances

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    or scheduled preventive maintenance) to condition-based or predictive maintenance strategies preventive maintenance actions, in the sense that planned production stoppages within this temporal horizonMaintenance decision making tool reaching a compromise between maintainability and reliability

  17. Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System Equipment

    E-Print Network [OSTI]

    most state of the art reliability centered maintenance (RCM) approaches, but it also accounts equipment, maintenance, reliability, risk, security, optimization 1.Introduction Maintenance of bulk1 Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System

  18. Motor Repair Tech Brief | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy HealthCommentsAugust 2012 Monthly ProjectEnterprisesRepair Tech Brief Motor

  19. Proactive maintenance initiatives at Argonne National Laboratory-West

    SciTech Connect (OSTI)

    Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

    1995-06-01T23:59:59.000Z

    In the late 1980`s, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ``mentor`` roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I&C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned.

  20. Steam turbine path evaluation during maintenance

    SciTech Connect (OSTI)

    Kubiak, J.; Angel, F. del; Carnero, A.; Campos, A. [Instituto de Investigaciones Electricas, Temixo, Morelos (Mexico)] [and others

    1996-07-01T23:59:59.000Z

    The deterioration of a turbine (Steam & Gas) flow path affects the efficiency of the turbine. The most critical factors which affect the efficiency of turbines are: wearing out of the trailing edges of the blades by solid particle erosion, deposits, material loss due to corrosion (also sand blast) which increases the flow area, increases in blade surface roughness, etc. Wearing out of the seals caused by shaft vibrations or rapid start-up leads to significant leakage losses. Some of these effects can be estimated with some precision during operation of the turbine, but an exact evaluation can be carried out during a maintenance applying a special fluid flow analysis program. Such a program has been developed and then adapted to achieve this goal. During maintenance the complete geometry of the steam path is measured (blades lengths, widths, angles, clearances, etc.) in the condition encountered before any corrections. Then the similar measurement is undertaken after, for example, clearance corrections, blade replacements, cleaning of the blades, etc. Using the program first of all the design data is calculated. Then the actual data is fed into the program and compared to the design data. Thus the effect of the blade surface roughness, increased seal clearances, flow area increase, solid particle damage to the trailing edge and so on for each particular stage is calculated. The effect is expressed in [kW] as a deviation from the design points. This data can be helpful during online evaluation of the turbine performance. This evaluation helps the management of the plant in undertaking the correct decision concerning the date of the next major maintenance and replacement part procurement. Many turbines in the Mexican utility have been evaluated in such a manner. Some examples are presented.

  1. 2003 Long-Term Surveillance and Maintenance Program Report

    SciTech Connect (OSTI)

    None

    2004-07-01T23:59:59.000Z

    Radioactive waste was created by the Federal Government and private industry at locations around the country in support of national defense, research, and civilian power-generation programs. If not controlled, much of this legacy waste would remain hazardous to human health and the environment indefinitely. Current technology does not allow us to render this waste harmless, so the available methods to control risk rely on consolidation, isolation, and long-term management of the waste. The U.S. Department of Energy (DOE) has an obligation to safely control the radioactive waste and to inform and train future generations to maintain and, perhaps, improve established protections. DOE is custodian for much of the radioactive and other hazardous waste under control of the Federal Government. DOE established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 and the Defense Decontamination and Decommissioning (D&D) Program and the Surplus Facilities Management Program in the 1980s. Congress passed the Uranium Mill Tailings Radiation Control Act (UMTRCA) in 1978. These federal programs and legislation were established to identify, remediate, and manage legacy waste. Remedial action is considered complete at a radioactive waste site when the identified hazardous material is isolated and the selected remedial action remedy is in place and functioning. Radioactive or other hazardous materials remain in place as part of the remedy at many DOE sites. Long-term management of radioactive waste sites incorporates a set of actions necessary to maintain protection of human health and the environment. These actions include maintaining physical impoundment structures in good repair to ensure that they perform as designed, preventing exposure to the wastes by maintaining access restrictions and warnings, and recording site conditions and activities for future custodians. Any actions, therefore, that will prevent exposure to the radioactive waste now or in the future are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE’s responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation’s nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE’s legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM–50), as well as management of remedies involving ground water and surface water contaminated by former processing activities.

  2. Sandia National Laboratories: Operations and Maintenance Workshop

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLSMolten-Salt StorageNoLong Range Radar StationReportsMaintenance

  3. Proceedings of design, repair, and refurbishment of steam turbines

    SciTech Connect (OSTI)

    Warnock, A.S. (Lehigh Univ., PA (United States))

    1991-01-01T23:59:59.000Z

    This book reports on the proceedings of design, repair and refurbishment of steam engines. Topics covered include: Advisor/Expert Systems for Steam Turbines; Moisture Effects on the Operating and Performance of Steam Turbines; Turbine Steam Path Development; Repair and Refurbishment of the Electric Generator Components; and Advanced Steam Turbine Designs.

  4. Improved Criteria for the Repair of Fabrication Flaws

    SciTech Connect (OSTI)

    Doctor, Steven R.; Schuster, George J.; Simonen, Fredric A.

    2004-12-01T23:59:59.000Z

    Section III of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code for nuclear power plant components requires radiographic examinations (RT) of welds and requires repairs for RT indications that exceed code acceptable sizes. This paper describes research that has generated data on welding flaws, which indicated that the largest flaws occur in repaired welds. The fabrication flaws were detected in material removed from cancelled nuclear power plants using high sensitivity Nondestructive Examination (NDE) and validated by complementary NDE and destructive testing. Evidence suggests that repairs are often for small and benign RT indications at locations buried within the vessel or pipe wall. Probabilistic fracture mechanics calculations are described in this paper to predict the increases in vessel and piping failure probabilities caused by the repair-induced flaws. Calculations address failures of embrittled vessel welds for pressurized thermal shock (PTS) transients and piping failures caused by fatigue crack growth. For vessels the small flaws, which are relatively common, can cause brittle fracture, such that the rarely encountered repair flaws of large sizes gave only modestly increased failure probabilities. Calculations for piping show that only relatively large fabrication flaws can cause failures because of the ductile nature of the piping material. The large repair flaws therefore significantly increased the failure probabilities. The paper recommends the use of more discriminating ultrasonic examinations in place of RT examinations along with repair criteria based on a fitness-for-purpose approach that minimize the number of unjustified repairs.

  5. A cask maintenance facility feasibility study

    SciTech Connect (OSTI)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1989-01-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations.

  6. Second Line of Defense Help Desk: Electronic Maintenance Reports - Local Maintenance Provider User Guide Rev. 1

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2011-12-14T23:59:59.000Z

    The Electronic Maintenance Report forms present a uniform dataset for analysis of Sustainability metrics. These forms collect readily minable data while allowing the attachment of site-specific checklists or other supporting files for review by the Sustainability Manager and Program Management.

  7. TRUPACT-II Operating and Maintenance Instructions

    SciTech Connect (OSTI)

    Westinghouse Electric Corporation, Waste Isolation Division

    1999-12-31T23:59:59.000Z

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

  8. E-Print Network 3.0 - anaemia-dna repair connection Sample Search...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Barclay Morrison and his Neurotrauma and Repair Laboratory... yet unknown, this repair process is aborted. If Morrison can find ... Source: Hone, James - Center for Electron...

  9. The SWAP SHOP: A surplus materials exchange network at DOE`s Oak Ridge Reservation

    SciTech Connect (OSTI)

    Bell, L.H.; Birch-Kennedy, S.

    1993-12-31T23:59:59.000Z

    The diversity and continually changing nature of the research and production programs at the ORR plant sites, as well as the size of the facilities and their physical separation on the ORR, lead to the buildup of surplus equipment and materials from canceled or completed projects, changes in work orders or directives, or over-procurement of particular items or materials. Many times, for lack of a means to find legitimate uses for these excess items, they have been disposed of as wastes or sold as salvage. Recognizing that this situation prevails at most, if not all, government facilities, Congress has enacted legislation encouraging the establishment of waste minimization, pollution prevention, and cost avoidance measures throughout government-owned facilities. In response to this, the Secretary of Energy has instituted a high-priority DOE initiative to develop, promote, and implement waste minimization and pollution prevention at government installations. One result of the increased awareness and emphasis on environmental concerns and improved resource management is the recent grassroots development of a surplus materials exchange network developed and operated on a voluntary basis by Environmental Protection Officers (EPOs) at the Oak Ridge installations. The EPOs are full-time or part-time staff members employed by each division to provide guidance and assistance for achieving compliance with all environmental regulatory requirements and to resolve waste disposal problems. The materials exchange network, called the SWAP SHOP, provides an EPO communications and problem-solving network to help eliminate unnecessary disposal of usable surplus chemicals and equipment at the Oak Ridge plant sites.

  10. Article Published on LED Lumen Maintenance and Light Loss Factors...

    Broader source: Energy.gov (indexed) [DOE]

    of a comprehensive lifetime rating - as well as the problematic relationship between SSL lifetime and lumen maintenance - determining an appropriate LLD factor for LED products...

  11. ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE

    SciTech Connect (OSTI)

    Trapp, D.

    2014-08-25T23:59:59.000Z

    The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

  12. Joint Maintenance Status Report of Potomac Electric Power Company...

    Broader source: Energy.gov (indexed) [DOE]

    pursuant to the December 20. 2006, Department of Energy ("DOE") Order No. 202-05-3. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection,...

  13. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    SciTech Connect (OSTI)

    Hendrickson, D.W. [ed.

    1995-03-14T23:59:59.000Z

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

  14. Optimal forest management for carbon sequestration and biodiversity maintenance.

    E-Print Network [OSTI]

    Nghiem, Thi Hong Nhung

    2011-01-01T23:59:59.000Z

    ??Managing planted forests for carbon sequestration and biodiversity maintenance has become increasingly important in times of rapid climate change and the loss of biodiversity worldwide.… (more)

  15. Preventative maintenance plan for emergency pumping trailers

    SciTech Connect (OSTI)

    Wiggins, D.D.

    1994-09-01T23:59:59.000Z

    The purpose/goal of this document is to identify the maintenance requirements and resources available to properly maintain the readiness and condition of the Emergency Pumping Equipment controlled by the Tank Waste Remediation System Tank Farms Plant Engineering and Tank Stabilization Operations. This equipment is intended to pump a single-shell tank (SST) that has been identified as an assumed leaking tank. The goal is to commence pumping (submersible or jet) as soon as safely possible after identifying a SST as an assumed leaking tank. Important information pertaining to the Emergency Pumping Equipment, Over-Ground Piping installation, and procedures is found in WHC-SD-WM-AP-005, ``Single Shell Tank Leak Emergency Pumping Guide.``

  16. Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement

    SciTech Connect (OSTI)

    Springer, D.; Dakin, B.

    2013-03-01T23:59:59.000Z

    This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

  17. Improving central heating plant performance at the defense construction supply center (DCSC): Advanced operation and maintenance methods. Final report

    SciTech Connect (OSTI)

    Savoie, M.J.; Standerfer, J.; Schmidt, C.M.; Gostich, J.; Mignacca, J.

    1994-11-01T23:59:59.000Z

    A 1987 air pollution emissions test done by the U.S. Army Environmental Hygiene Agency (USAEHA) identified several problems with the central heating plant (CHP) at the Defense Construction Supply Center (DCSC), Columbus, OH. Though DCSC repaired the specified problems, improved coal specifications, and tried to reduce air infiltration, CHP performance remained at unacceptable levels. Consequently, DCSC contracted the U.S. Army Construction Engineering Research Laboratories (USACERL) to apply advanced operation and maintenance procedures to improve its combustion system. This study employed a system-wide approach to evaluate the CHP 5 fuel storage, combustion, heat distribution, and the control of air emissions. Many short-term improvements to the CHP were identified and tested. Subsequent combustion and air emissions tests revealed that the recommended improvements successfully increased CHP efficiency. Long-term improvements were also recommended to help maintain the short-term improvements.

  18. 05.01 1 Budget Maintenance and Development REGENTS' POLICY

    E-Print Network [OSTI]

    Pantaleone, Jim

    05.01 1 Budget Maintenance and Development REGENTS' POLICY PART V ­ FINANCE AND BUSINESS MANAGEMENT Chapter 05.01 - Budget Development and Maintenance P05.01.010. Budget Policy. A. The budget by their respective annually adopted budgets and approved amendments, in accordance with procedure established

  19. Modeling Web Maintenance Centers Through Queue Models M. Di Penta

    E-Print Network [OSTI]

    Di Penta, Massimiliano

    Modeling Web Maintenance Centers Through Queue Models M. Di Penta , G. Casazza ¡ , G. Antoniol´eal Abstract The Internet and WEB pervasiveness are changing the landscape of several different areas ranging from infor- mation gathering/managing and commerce to software development, maintenance and evolution

  20. Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1

    E-Print Network [OSTI]

    Kay, Mark A.

    Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1 Office of Postdoctoral Maintenance Screen. All starting points begin before the popup menu comes up. In Internet Explorer the Orientation to Landscape, and click OK. Print as needed to either your printer or to Adobe PDF (only works

  1. Intermediate hearth repair technique at Thyssen Stahl AG

    SciTech Connect (OSTI)

    Kowalski, W.; Bachhofen, H.J.; Ruether, P.; Ballewski, T. [Thyssen Stahl AG, Duisburg (Germany)

    1996-12-31T23:59:59.000Z

    Nowadays various techniques for the fastest possible intermediate repair and/or emplacement of refractory materials above the tuyere level allow a significant extension of furnace campaign life. The latter are hence now exclusively determined by the service life of the hearth. The improvement of hearth monitoring and the estimation of residual brick strength of the refractory lining on the basis of temperature measurements in the hearth enable the location of individual zones of premature wear. These measurement methods, which were developed by Thyssen Stahl AG, aid the decision to undertake selective repair of the hearth. Three areas of repair are differentiated: taphole zone; hearth wall, localized; and hearth wall, extensive. This hearth repair method is described in this report using the example of hearth refurbishing blast furnace 8, Hamborn.

  2. Microsoft Word - SPR Emergency Pipeline Repair, 2013-2017 NEPA...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion to be applied: B5.4 Repair or replacement of sections of a crude oil, produced water, brine or geothermal pipeline, if the actions are determined by the Army...

  3. A tissue engineering strategy for integrative cartilage repair

    E-Print Network [OSTI]

    Mroszczyk, Keri A

    2014-01-01T23:59:59.000Z

    Tissue engineering for cartilage repair is a promising approach for improving the healing of articular defects, as biomaterials and growth factors can be supplied directly to a focal lesion. However, integrating neo-tissue ...

  4. Coherent testing and simulation of composite blade repair

    E-Print Network [OSTI]

    McNichols, Brian Glenn

    2012-06-07T23:59:59.000Z

    COHERENT TESTING AND SIMULATION OF COMPOSITE BLADE REPAIR A Thesis by BRIAN GLENN MCNICHOLS Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... December 1997 Major Subject: Mechanical Engineering COHERENT TESTING AND SIMULATION OF COMPOSITE BLADE REPAIR A Thesis by BRIAN GLENN MCNICHOLS Submitted to Texas A&M University In partial fulfillment of the requirements for the degree of MASTER...

  5. Plant maintenance and advanced reactors issue, 2008

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2009-09-15T23:59:59.000Z

    The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.

  6. Maintenance implementation plan for B Plant

    SciTech Connect (OSTI)

    Tritt, S.E.

    1992-06-01T23:59:59.000Z

    The B Plant facility, is located in the 200 East Area at the Hanford Site in south-central Washington State. It consists of two major operating areas: the B Plant Canyon Building, and the Waste Encapsulation and Storage Facility (WESF). The B Plant was originally designed to chemically process spent nuclear fuels. After this initial mission was completed, the plant was modified to provide for the separation of strontium and cesium, individually, from the fission productwaste stream following plutonium and uranium recovery from irradiated reactor fuels in the Plutonium-Uranium Extraction Plant (PUREX). The recovered, purified, and concentrated strontium and cesium solutions were then transferred to the WESF for conversion to solid compounds, encapsulation, and interim storage. After strontium and cesium removal, the remaining waste was transferred from B Plant to tank farms. B Plantis an operating facility that is required to ensure safe storage And management of the WESF cesium and strontium capsules, as well as a substantial radiological inventory remaining in the plant from previous campaigns. There are currently no production activities at B Plant, but several operating systems are required to accomplish the current B Plant mission.B Plant receives and stores various chemicals from commercial suppliers for treatment of low-level waste generated at WESF and B Plant, generation of demineralized water, and conditioning of water used in heating, ventilation, and air conditioning units. This report describes the maintenance of B Plant, including personnel training and schedules.

  7. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28T23:59:59.000Z

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  8. An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling Problem, an integrated ACO approach to solve joint production and preventive maintenance scheduling problem very effective solutions for this problem. Key words-- ACO, Production, Preventive maintenance

  9. Predictive maintenance policy for a gradually deteriorating system subject to stress

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    of optimal maintenance strategies for improving system availability, preventing Preprint submitted and preventive. Preventive maintenance itself can be categorized into two classes: systematic preventive preventive maintenance policies based on the a priori statistical knowledge of the system lifetime [3]. CBM

  10. Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using a Simulation-Based Approximate

    E-Print Network [OSTI]

    Fernandez, Emmanuel

    Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using Dynamic Programming (ADP) approach for the optimization of Preventive Maintenance (PM) scheduling schedules. I. INTRODUCTION In semiconductor manufacturing systems, or fabs, pre- ventive maintenance (PM

  11. CBM processes are applicable to maintenance activities on complex systems. Southwest Research Institute

    E-Print Network [OSTI]

    Chapman, Clark R.

    performance costs, and preventive/ scheduled maintenance replaces parts before the end of their useful life optimizes costs between preventive and corrective maintenance. Preventive Condition Number of FailuresCBM processes are applicable to maintenance activities on complex systems. Southwest Research

  12. Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field

    E-Print Network [OSTI]

    California at Davis, University of

    Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field Kristin Group, Davis, CA, USA 4 Southern California Edison, Irwindale, CA, USA ABSTRACT HVAC maintenance utilities across the nation to include HVAC maintenance measures in energy efficiency programs

  13. If your codes run much slower than before the maintenance on...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    codes run much slower after the maintenance on 62514 If your codes hang or run much slower after the maintenance on 62514 June 27, 2014 (0 Comments) During the maintenance on...

  14. Genome-Wide Identification and 3D Modeling of Proteins involved in DNA Damage Recognition and Repair (Final Report)

    SciTech Connect (OSTI)

    Ruben A. Abagyan, PhD

    2004-04-15T23:59:59.000Z

    OAK-B135 DNA Damage Recognition and Repair (DDR and R) proteins play a critical role in cellular responses to low-dose radiation and are associated with cancer. the authors have performed a systematic, genome-wide computational analysis of genomic data for human genes involved in the DDR and R process. The significant achievements of this project include: (1) Construction of the computational pipeline for searching DDR and R genes, building and validation of 3D models of proteins involved in DDR and R; (2) Functional and structural annotation of the 3D models and generation of comprehensive lists of suggested knock-out mutations; (3) Important improvement of macromolecular docking technology and its application to predict the DNA-Protein complex conformation; (4) Development of a new algorithm for improved analysis of high-density oligonucleotide arrays for gene expression profiling; (5) Construction and maintenance of the DNA Damage Recognition and Repair Database; and (6) Producing 14 research papers (10 published and 4 in preparation).

  15. STOP: Always work safely around machines. Prepare for a safe job. A variety of machines are used in many campus shops including

    E-Print Network [OSTI]

    Rose, Michael R.

    STOP: Always work safely around machines. Prepare for a safe job. A variety of machines are used in many campus shops including: · Drill presses · Table saws · Band saws · Grinders · Milling machines AACCCCIIDDEENNTTSS THINK: Machines may present real and significant hazards, such as physical entrapment, severe

  16. MEMBERS ONLY | Join | Renew | Shop | About | Contact Us | Home ASME.ORG > News & Public Policy > Press Releases > Research Begun on New Fuel Cell Type

    E-Print Network [OSTI]

    SEARCH ASME: MEMBERS ONLY | Join | Renew | Shop | About | Contact Us | Home ASME.ORG > News, the magazine reports on a fuel cell that cleans domestic wastewater while producing electrical energy. This new, takes the high concentration of organic matter found in wastewater and coverts it to energy. "Where

  17. Knowledge Exchange records from 01/04/2013 08/07/2013 CATEGORY 14 -Work shops, exhibitions, demonstrations, and open days presented

    E-Print Network [OSTI]

    Knowledge Exchange records from 01/04/2013 ­ 08/07/2013 CATEGORY 14 - Work shops, exhibitions; SILVICULTURE; WOODLAND HERITAGE; CHALARA FRAXINEA; 2014-FR-CAT-14 Abstract: Participated at the Woodland: GARDENING FOCUS; 2014-FR-CAT-14 Abstract: Attended by an audience of thousands. Class: No electronic

  18. FAciLity mAintenAnce College of Rural and Community Development

    E-Print Network [OSTI]

    Hartman, Chris

    maintenance trends and developing strate- gies for future maintenance needs. Occupational endorsement Program--Troubleshooting HVAC Systems......................................2 CTT F151--Introduction to Plumbing Tools

  19. E-Print Network 3.0 - agreement maintenance based Sample Search...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Computer Technologies and Information Sciences 51 Proposed Program: Reliability-Centered Maintenance (RCM) for the High Flux Isotope Reactor Summary: -Centered Maintenance...

  20. E-Print Network 3.0 - anti-psychotic maintenance medication Sample...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Software... Safety and Security Neural networks IVARA www.ivara.com Reliability centered maintenance solutions... maintenance solutions RCM toolkit (report generation)...

  1. E-Print Network 3.0 - alternative telomere maintenance Sample...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Summary: plays a role in telomere maintenance. To investigate the possibility that ORC bound to telo- mere... to varying extents in cells with different telomere-maintenance...

  2. E-Print Network 3.0 - aircraft maintenance Sample Search Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the U.S. Army Logistics Air Fleet Summary: capacity, airfield landing capability, maximum flight range of aircraft, maintenance requirement... mandated maintenance...

  3. Los Alamos Site Office Nuclear Maintenance Management Program...

    Office of Environmental Management (EM)

    WCRR Monthly Diesel Generator PM, dated 04082011 WI 06.01 Attachment A, JRF-11-06 Preventive Maintenance Cancellation, dated 4122011 WI 06.01 Attachment A, JRF-11-09...

  4. FEMP Offers New Training on Photovoltaic Operations and Maintenance...

    Broader source: Energy.gov (indexed) [DOE]

    The seminar will cover operations and maintenance (O&M) best practices for photovoltaic (PV) systems of 100 kW or less, including planning for a PV O&M scope of work and...

  5. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that includes objectives published in the 2011-2020...

  6. Multi-canister overpack operations and maintenance manual

    SciTech Connect (OSTI)

    PIERCE, S.R.

    1999-06-23T23:59:59.000Z

    This manual provides general operating and maintenance instructions for the Multi-Canister Overpack. Procedure outlines included are conceptual in nature and will be modified, expanded, and refined during preparation of detailed operating procedures.

  7. Pre-conceptual Design Assessment of DEMO Remote Maintenance

    E-Print Network [OSTI]

    Loving, A; Sykes, N; Iglesias, D; Coleman, M; Thomas, J; Harman, J; Fischer, U; Sanz, J; Siuko, M; Mittwollen, M; others,

    2013-01-01T23:59:59.000Z

    EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/13, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally ...

  8. Method and computer program product for maintenance and modernization backlogging

    DOE Patents [OSTI]

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19T23:59:59.000Z

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  9. Gas Turbine Technology, Part B: Components, Operations and Maintenance

    E-Print Network [OSTI]

    Meher-Homji, C. B.; Focke, A. B.

    This paper builds on Part A and discusses the hardware involved in gas turbines as well as operations and maintenance aspects pertinent to cogeneration plants. Different categories of gas turbines are reviewed such as heavy duty aeroderivative...

  10. Job Maintenance and Capital Development Fund (North Carolina)

    Broader source: Energy.gov [DOE]

    The Job Maintenance and Capital Development Fund provides annual grants to businesses which are located in Development Tier I counties. The Fund is intended to encourage the retention of...

  11. Maintenance Implementation Plan for B Plant. Revision 1

    SciTech Connect (OSTI)

    Tritt, S.E.

    1993-04-01T23:59:59.000Z

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ``Nuclear Facilities`` (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation.

  12. Technical Insights for Saltstone PA Maintenance

    SciTech Connect (OSTI)

    Flach, G.; Sarkar, S.; Mahadevan, S.; Kosson, D.

    2011-07-20T23:59:59.000Z

    The Cementitious Barriers Partnership (CBP) is a collaborative program sponsored by the US DOE Office of Waste Processing. The objective of the CBP is to develop a set of computational tools to improve understanding and prediction of the long-term structural, hydraulic, and chemical performance of cementitious barriers and waste forms used in nuclear applications. CBP tools are expected to better characterize and reduce the uncertainties of current methodologies for assessing cementitious barrier performance and increase the consistency and transparency of the assessment process, as the five-year program progresses. In September 2009, entering its second year of funded effort, the CBP sought opportunities to provide near-term tangible support to DOE Performance Assessments (PAs). The Savannah River Saltstone Disposal Facility (SDF) was selected for the initial PA support effort because (1) cementitious waste forms and barriers play a prominent role in the performance of the facility, (2) certain important long-term behaviors of cementitious materials composing the facility are uncertain, (3) review of the SDF PA by external stakeholders is ongoing, and (4) the DOE contractor responsible for the SDF PA is open to receiving technical assistance from the CBP. A review of the current (SRR Closure & Waste Disposal Authority 2009) and prior Saltstone PAs (e.g., Cook et al. 2005) suggested five potential opportunities for improving predictions. The candidate topics considered were (1) concrete degradation from external sulfate attack, (2) impact of atmospheric exposure to concrete and grout before closure, such as accelerated slag and Tc-99 oxidation, (3) mechanistic prediction of geochemical conditions, (4) concrete degradation from rebar corrosion due to carbonation, and (5) early age cracking from drying and/or thermal shrinkage. The candidate topics were down-selected considering the feasibility of addressing each issue within approximately six months, and compatibility with existing CBP expertise and already-planned activities. Based on these criteria, the five original topics were down-selected to two: external sulfate attack and mechanistic geochemical prediction. For each of the selected topics, the CBP communicated with the PA analysts and subject matter experts at Savannah River to acquire input data specific to the Saltstone facility and related laboratory experiments. Simulations and analyses were performed for both topics using STADIUM (SIMCO 2008), LeachXS/ORCHESTRA (ECN 2007, Meeussen 2003), and other software tools. These supplemental CBP analyses produced valuable technical insights that can be used to strengthen the Saltstone PA using the ongoing PA maintenance process. This report in part summarizes key information gleaned from more comprehensive documents prepared by Sarkar et al. (2010), Samson (2010), and Sarkar (2010).

  13. Polymer nanocomposites for high-temperature composite repair

    SciTech Connect (OSTI)

    Sheng, Xia

    2008-12-01T23:59:59.000Z

    A novel repair agent for resin-injection repair of advanced high temperature composites was developed and characterized. The repair agent was based on bisphenol E cyanate ester (BECy) and reinforced with alumina nanoparticles. To ensure good dispersion and compatibility with the BECy matrix in nanocomposites, the alumina nanoparticles were functionalized with silanes. The BECy nanocomposites, containing bare and functionalized alumina nanoparticles, were prepared and evaluated for their thermal, mechanical, rheological, and viscoelastic properties. The monomer of BECy has an extremely low viscosity at ambient temperature, which is good for processability. The cured BECy polymer is a highly cross-linked network with excellent thermal mechanical properties, with a high glass transition temperature (T{sub g}) of 270 C and decomposition temperature above 350 C. The incorporation of alumina nanoparticles enhances the mechanical and rheological properties of the BECy nanocomposites. Additionally, the alumina nanoparticles are shown to catalyze the cure of BECy. Characterization of the nanocomposites included dynamic mechanical analysis, differential scanning calorimetry, thermogravimetric analysis, rheological and rheokinetic evaluation, and transmission electron microscopy. The experimental results show that the BECy nanocomposite is a good candidate as repair agent for resin-injection repair applications.

  14. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    SciTech Connect (OSTI)

    Meldrom, C.A.

    1996-03-01T23:59:59.000Z

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP`s current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes.

  15. Applicability of Operational Research Techniques in CANDU Nuclear Plant Maintenance

    SciTech Connect (OSTI)

    Doyle, E. Kevin [Bruce Power LP, Box 4000B12, Tiverton, Ont., N0G2T0 (Canada)

    2002-07-01T23:59:59.000Z

    As previously reported at ICONE 6 in New Orleans, 1996, and ICONE 9 in Niece, 2001, the use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Innovative practices included greatly reducing Reliability Centered Maintenance (RCM) costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is being put in place. Further cost refinement of the station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data is being evaluated. A wide range of Operational Research (OR) literature was reviewed for implementation issues and several encouraging areas were found that will assist in the current effort of evaluating maintenance optimization techniques for nuclear power production. The road ahead is expected to consist first of resolving 25 years of data issues and preserving the data via appropriate knowledge system techniques while post war demographics permit experts to input into the system. Subsequent analytical techniques will emphasize total simplicity to obtain the requisite buy in from Corporate Executives who possibly are not trained in Operational Research. Case studies of containment airlock seal failures are used to illustrate the direct applicability of stochastic processes. Airlocks and transfer chambers were chosen as they have long been known as high maintenance items. Also, the very significant financial consequences of this type of failure will help to focus the attention of Senior Management on the effort. Despite substantial investment in research, improvement in the design of the seal material or configuration has not been achieved beyond the designs completed in the 1980's. Overall, the study showed excellent agreement of the relatively quick stochastic methods with the maintenance programs produced at great cost over years of trial and error. The pivotal role of expert opinion via experienced users/problem owners/maintenance engineers in all phases of the method and its application was noted and will be explored in subsequent efforts. The results are displayed via economic alternatives to more easily attract the attention of Maintenance Managers. Graphical overviews of the data demonstrated that substantial insight can be gained by simply organizing the data into statistically meaningful arrays such as histograms. The conclusions highlight several very positive avenues to evaluate at this particular juncture in time. (author)

  16. An internal seal for repairing natural gas mains

    E-Print Network [OSTI]

    Cooper, Samuel A.

    1984-01-01T23:59:59.000Z

    Joint leakage from low pressure natural gas distribution mains (typical value: 0.25 ft[superscript 3] at 6 inwg gas pressure) is a persistent source of maintenance problems for utitlites. External encapsulation is the usual ...

  17. November 21, 2007 Page 1 MAINTENANCE PROCEDURES FOR FUME HOODS

    E-Print Network [OSTI]

    Manning, Sturt

    and no radioactive contamination is present. o Do NOT work in areas or on equipment that is posted with Radioactive exhaust components are potentially contaminated with chemical residue. If potential contamination proceeding. Radioactive Material Hoods o If a radioactive materials use hood is being repaired

  18. Single-machine scheduling with periodic and exible periodic maintenance to minimize maximum tardiness

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    periods often appear in industry due to a machine breakdown (stochastic) or preventive maintenance of machine unavailability. However, in some cases (e.g. preventive maintenance), the maintenance of a machineSingle-machine scheduling with periodic and exible periodic maintenance to minimize maximum

  19. DYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    . There are mainly two types of maintenance activities: the preventive maintenance, whose activities can be long termDYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni good performance with production means. Especially in maintenance services field where the different

  20. Analysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H.

    E-Print Network [OSTI]

    Langseth, Helge

    maintenance interval , and the critical failure rate given that no preventive maintenance is performed (asAnalysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H. SINTEF". The suggested modelling provides means to predict how maintenance tasks will affect the rate of critical

  1. Designing an on-line multimedia maintenance manual for a production environment

    E-Print Network [OSTI]

    Brinkman, Willem-Paul

    ). It is a combination of design-out maintenance (DOM) and preventive maintenance. The focus of DOM is to improve36 Designing an on-line multimedia maintenance manual for a production environment W.P. Brinkman, V.P. Buil, R. Cullen1 , R. Gobits2 and F.L. van Nes e-mail: w.p.brinkman@tue.nl Abstract Maintenance

  2. Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b,

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b, , Sandra Preventive maintenance a b s t r a c t Today, many industrial companies must face problems raised to make predictive maintenance to prevent a serious breakdown. In addition, the corrective maintenance

  3. Development of criteria for fatigue repairs in bridge girders damaged by out-of-plane distortion

    E-Print Network [OSTI]

    Wilson, Scott David

    1994-01-01T23:59:59.000Z

    repaired and unrepaired cracks along the longitudinal web-to-flange connection of a plate girder subjected to a linear bending stress to determine if repair by drilling holes is really necessary. The results of the finite element analyses...

  4. EXPENDITURE OBJECT CODES Alphabetical Listing Expenditure Object Codes In Alphabetical Order

    E-Print Network [OSTI]

    Harms, Kyle E.

    .................................................................................................................................7620 Automotive repairs, minor & maintenance, not on service contract

  5. Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1990-08-01T23:59:59.000Z

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  6. Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999

    SciTech Connect (OSTI)

    Not Available

    1990-08-01T23:59:59.000Z

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  7. Development of quick repairing technique for ceramic burner in hot stove of blast furnace

    SciTech Connect (OSTI)

    Kondo, Atsushi; Doura, Kouji; Nakamura, Hirofumi [Sumitomo Metal Industries, Ltd., Wakayama (Japan). Wakayama Steel Works

    1997-12-31T23:59:59.000Z

    Refractories of ceramic burner in hot stoves at Wakayama No. 4 blast furnace were damaged. There are only three hot stoves, so repairing must be done in a short. Therefore, a quick repairing technique for ceramic burners has been developed, and two ceramic burners were repaired in just 48 hours.

  8. DNA Repair 8 (2009) 803812 Contents lists available at ScienceDirect

    E-Print Network [OSTI]

    Sekelsky, Jeff

    reduced gap repair and loss of the checkpoint response to low-dose irradiation. These findings shed light. Loss of the FHA domain resulted in hypersensitivity to ionizing radiation and defects in gap repair time for repair pro- cesses to act. A given DNA damage response protein may be involved Corresponding

  9. Workshop Proceedings: Life Assessment and Repair of Steam Turbine Casings

    SciTech Connect (OSTI)

    None

    1986-07-01T23:59:59.000Z

    With the trend toward operating steam turbines far beyond their design lives, utilities need methods for assessing and extending the lives of the turbine casings. Consolidating and publishing industry experience on this subject will help utilities make run/replace decisions, select appropriate repair techniques, implement operational changes, and select new designs to meet future needs.

  10. Corrosion Repair and Corrosion Protection of Reinforced Concrete Structures in

    E-Print Network [OSTI]

    Das, Suman

    11/14/2014 1 Corrosion Repair and Corrosion Protection of Reinforced Concrete Structures in Pulp and Paper Mills Vector Construction / Vector Corrosion Technologies www.vectorgroup.com www.vector-corrosion.com Presentation Outline · Introduction · Corrosion of Reinforced Concrete Structures · Protection of Chests

  11. Thermosetting Polymer-Matrix Composites for Strucutral Repair Applications

    SciTech Connect (OSTI)

    William Kirby Goertzen

    2007-12-01T23:59:59.000Z

    Several classes of thermosetting polymer matrix composites were evaluated for use in structural repair applications. Initial work involved the characterization and evaluation of woven carbon fiber/epoxy matrix composites for structural pipeline repair. Cyanate ester resins were evaluated as a replacement for epoxy in composites for high-temperature pipe repair applications, and as the basis for adhesives for resin infusion repair of high-temperature composite materials. Carbon fiber/cyanate ester matrix composites and fumed silica/cyanate ester nanocomposites were evaluated for their thermal, mechanical, viscoelastic, and rheological properties as they relate to their structure, chemistry, and processing characteristics. The bisphenol E cyanate ester under investigation possesses a high glass transition temperature, excellent mechanical properties, and unique ambient temperature processability. The incorporate of fumed silica served to enhance the mechanical and rheological properties of the polymer and reduce thermal expansion without sacrificing glass transition or drastically altering curing kinetics. Characterization of the composites included dynamic mechanical analysis, thermomechanical analysis, differential scanning calorimetry, thermogravimetric analysis, rheological and rheokinetic evaluation, and transmission electron microscopy.

  12. USDA Grants to Help Repair Housing in Rural Areas

    Broader source: Energy.gov [DOE]

    The U.S. Department of Agriculture (USDA) is accepting applications for the Housing Preservation Grant program, which provides funding to repair low-income housing, rental properties, or co-op owned housing. Eligible sponsors include state agencies, local government, Tribes, and nonprofits.

  13. HOW TO REPAIR A SECOND-ORDER SURFACE FOR COMPUTER

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 HOW TO REPAIR A SECOND-ORDER SURFACE FOR COMPUTER EXPERIMENTS BY KRIGING Astrid JOURDAN and analysis of computer experiments have been widely investigated in the past decade. Two approaches seem describes and compares them briefly in order to present a methodology for computer experiments based

  14. Development/Plasticity/Repair Group I Metabotropic Glutamate Receptors Control

    E-Print Network [OSTI]

    Grau, James

    Development/Plasticity/Repair Group I Metabotropic Glutamate Receptors Control Metaplasticity the spinal cord can support several forms of plasticity, including response­outcome (instrumental) learning. This inhibi- tion of plasticity in spinal learning is itself a form of plasticity that requires i

  15. Breakthrough Technologies In Vivo Observation of Cavitation and Embolism Repair

    E-Print Network [OSTI]

    Holbrook, N. Michele

    Breakthrough Technologies In Vivo Observation of Cavitation and Embolism Repair Using Magnetic that approximately 10 vessels had cavitated during this time. Leaf water potentials decreased from 1.25 to 2.1 MPa cavitation. Refilling of xylem vessels occurred as soon as the lights were switched off, with the majority

  16. Development/Plasticity/Repair Identification of Nicotinic Acetylcholine Receptor Recycling

    E-Print Network [OSTI]

    Alford, Simon

    Development/Plasticity/Repair Identification of Nicotinic Acetylcholine Receptor Recycling and Its, University of Michigan, Ann Arbor, Michigan 48109 In the CNS, receptor recycling is critical for synaptic plasticity; however, the recycling of receptors has never been observed at peripheral synapses. Using a novel

  17. Complications of Endovascular Repair of Abdominal Aortic Aneurysms: A Review

    SciTech Connect (OSTI)

    Katzen, Barry T. [Baptist Cardiac and Vascular Institute, Baptist Health Systems, Department of Interventional Radiology, Florida (United States)], E-mail: barryk@baptisthealth.net; MacLean, Alexandra A. [New York Hospital-Queens, Department of Surgery (United States)

    2006-12-15T23:59:59.000Z

    The endovascular procedure for repair of abdominal aortic aneurysms has had an enormous impact on the treatment of this challenging disease. Complications, however, do occur and it is important to have a thorough understanding of the array of complications and appropriate management strategies. In this review of endovascular complications, we describe early and late complications paying particular attention to preventive, treatment and surveillance strategies.

  18. This construction, refurbishment and maintenance guide identifies the main sustainability factors that need to be considered during the design, refurbishment, construction or ongoing maintenance of buildings on our

    E-Print Network [OSTI]

    Sheldon, Nathan D.

    1 This construction, refurbishment and maintenance guide identifies the main sustainability factors that need to be considered during the design, refurbishment, construction or ongoing maintenance or manage the refurbishment, construction or ongoing maintenance of buildings on behalf of the College. We

  19. Project Final Report: Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|SpeedShop

    SciTech Connect (OSTI)

    Galarowicz, James

    2014-01-06T23:59:59.000Z

    In this project we created a community tool infrastructure for program development tools targeting Petascale class machines and beyond. This includes tools for performance analysis, debugging, and correctness tools, as well as tuning and optimization frameworks. The developed infrastructure provides a comprehensive and extensible set of individual tool building components. We started with the basic elements necessary across all tools in such an infrastructure followed by a set of generic core modules that allow a comprehensive performance analysis at scale. Further, we developed a methodology and workflow that allows others to add or replace modules, to integrate parts into their own tools, or to customize existing solutions. In order to form the core modules, we built on the existing Open|SpeedShop infrastructure and decomposed it into individual modules that match the necessary tool components. At the same time, we addressed the challenges found in performance tools for petascale systems in each module. When assembled, this instantiation of community tool infrastructure provides an enhanced version of Open|SpeedShop, which, while completely different in its architecture, provides scalable performance analysis for petascale applications through a familiar interface. This project also built upon and enhances capabilities and reusability of project partner components as specified in the original project proposal. The overall project team’s work over the project funding cycle was focused on several areas of research, which are described in the following sections. The reminder of this report also highlights related work as well as preliminary work that supported the project. In addition to the project partners funded by the Office of Science under this grant, the project team included several collaborators who contribute to the overall design of the envisioned tool infrastructure. In particular, the project team worked closely with the other two DOE NNSA laboratories Los Alamos and Sandia leveraging co-funding for Krell by ASC’s Common Computing Environment (CCE) program as laid out in the original proposal. The ASC CCE co-funding, coordinated through LLNL, was for 50% of the total project funding, with the ASC CCE portion of the funding going entirely to Krell, while the ASCR funding itself was split between Krell and the funded partners. This report covers the entire project from both funding sources. Additionally, the team leveraged the expertise of software engineering researchers from Carnegie Mellon University, who specialize in software framework design, in order to achieve a broadly acceptable component framework. The Component Based Tool Framework (CBTF) software has been released to the community. Information related to the project and the released software can be found on the CBTF wiki page at: http://sourceforge.net/p/cbtf/wiki/Home

  20. Distributed Construction and Maintenance of Bandwidth and Energy Efficient

    E-Print Network [OSTI]

    Korpeoglu, Ibrahim

    wireless RF technology designed initially for cable replacement at indoor places, but also supports usageDistributed Construction and Maintenance of Bandwidth and Energy Efficient Bluetooth Scatternets on simulations, the paper also presents the improvements in bandwidth-efficiency and reduction in energy

  1. CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

  2. CRAD, Maintenance- Los Alamos National Laboratory TA 55 SST Facility

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance program at the Los Alamos National Laboratory TA 55 SST Facility.

  3. Joint Traffic Blocking and Routing under Network Failures and Maintenances

    E-Print Network [OSTI]

    Liu, Yong

    Joint Traffic Blocking and Routing under Network Failures and Maintenances Chao Liang ECE Dept paths. Therefore, it is important to design ingress traffic blocking and routing jointly to achieve a good balance between the two factors. Working towards this goal, we formulate a joint ingress blocking

  4. CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  5. Winter Performance and Maintenance of Porous Asphalt Pavements

    E-Print Network [OSTI]

    Concrete (HSG-B)Porous Asphalt (HSG-C) #12;Cold Climate Performance Results #12;12 Porous Asphalt SurfaceWinter Performance and Maintenance of Porous Asphalt Pavements Robert M. Roseen, Ph.D., P.E., D impacts for new development and reverse impacts in areas with redevelopment. #12;Porous Asphalt Design

  6. Enhancing Building Performance Through More Responsive Maintenance System

    E-Print Network [OSTI]

    Alsudairi, A. A.

    2012-01-01T23:59:59.000Z

    forth). For example, installing a water heater needs a plumber and electrician to complete the job in a traditional maintenance system. With MST principle, this work order can be done by one technician instead of two. In this way work orders...

  7. The Facility The Propellants North Administrative and Maintenance

    E-Print Network [OSTI]

    and Maintenance Facility Inside Propellants North is window glazing and framing from the iconic firing rooms with energy recovery technology · Highly insulated roof and walls · Lighting fixtures with smart lighting glazing and framing · Reclaimed and processed waste concrete from Kennedy's demolition projects

  8. Constraint processing for optimal maintenance Daniel Frost and Rina Dechter

    E-Print Network [OSTI]

    Dechter, Rina

    preventative maintenance of power generating units within a power plant. We show how these problems can be cast competitive CSP algorithms on the main- tenance scheduling benchmark. The authors thank the Electric Power of a CSP : : : : : : : : : : : : : : : : : : : : : : : : : : : 7 2.3 CSP Algorithms

  9. Periodic NDE for Bridge Maintenance Ralf W. Arndt

    E-Print Network [OSTI]

    Huston, Dryver R.

    Periodic NDE for Bridge Maintenance Ralf W. Arndt NRC Research Associate U.S. Federal Highway Administration NDE Center 6300 Georgetown Pike McLean, VA 22101, USA ralf.arndt@fhwa.dot.gov Frank Jalinoos Program Manager U.S. Federal Highway Administration NDE Center 6300 Georgetown Pike McLean, VA 22101, USA

  10. Maintenance and Operations of Schools for Energy Efficiency

    E-Print Network [OSTI]

    McClure, J. D.; Estes, J. M.

    1986-01-01T23:59:59.000Z

    Maintenance and operations of schools with energy efficiency as a priority can reduce annual utility costs 3 to 30 percent. Most school districts do not have an organized plan for tracking energy usage or cost. Energy performance (e.g. Btu/ft^2-yr...

  11. REST Web Service Maintenance Through API Policy Enforcement

    E-Print Network [OSTI]

    California at Santa Barbara, University of

    1 REST Web Service Maintenance Through API Policy Enforcement Hiranya Jayathilaka, Chandra Krintz 100% annual growth rate [2]. These APIs increasingly employ the REST (Representational State Transfer accessible to users via web application programming interfaces (web APIs) and cloud-based deployment

  12. Model 6000 Laser Controller Operation and Maintenance Manual

    E-Print Network [OSTI]

    i Model 6000 Laser Controller Operation and Maintenance Manual #12;Corporate Headquarters Canada by improper use or failure to observe proper operating procedures per the product specification or operators 9002 by the British Standards Institution. #12;Limited Warranty Newport warrants that this product

  13. ARIES-CS MAINTENANCE SYSTEM DEFINITION AND ANALYSIS

    E-Print Network [OSTI]

    ARIES-CS MAINTENANCE SYSTEM DEFINITION AND ANALYSIS LESTER M. WAGANER* and RICHARD J. PEIPERT, Jr in the electronic version. I. INTRODUCTION The ARIES studies, sponsored by the U.S. Depart- ment of Energy and led how the physics and coil definition determine and influence the power core elements. Especially

  14. Combined Haploinsufficiency for ATM and RAD9 as a Factor in Cell Transformation, Apoptosis, and DNA Lesion Repair Dynamics

    E-Print Network [OSTI]

    Lesion Repair Dynamics Lubomir B. Smilenov, Howard B. Lieberman, Stephen A. Mitchell, Ronald A. Baker

  15. Biomolecular Simulation of Base Excision Repair and Protein Signaling

    SciTech Connect (OSTI)

    Straatsma, TP; McCammon, J. A.; Miller, John H.; Smith, Paul E.; Vorpagel, Erich R.; Wong, Chung F.; Zacharias, Martin W.

    2006-03-03T23:59:59.000Z

    The goal of the Biomolecular Simulation of Base Excision Repair and Protein Signaling project is to enhance our understanding of the mechanism of human polymerase-?, one of the key enzymes in base excision repair (BER) and the cell-signaling enzymes cyclic-AMP-dependent protein kinase. This work used molecular modeling and simulation studies to specifically focus on the • dynamics of DNA and damaged DNA • dynamics and energetics of base flipping in DNA • mechanism and fidelity of nucleotide insertion by BER enzyme human polymerase-? • mechanism and inhibitor design for cyclic-AMP-dependent protein kinase. Molecular dynamics simulations and electronic structure calculations have been performed using the computer resources at the Molecular Science Computing Facility at the Environmental Molecular Sciences Laboratory.

  16. Providing protection: Agencies receive funding to repair, upgrade dams

    E-Print Network [OSTI]

    Wythe, Kathy

    2009-01-01T23:59:59.000Z

    Story by Kathy Wythe tx H2O | pg. 26 Providing protection Agencies receive funding to repair, upgrade dams along with local partners, can apply for grant funds, he said. Construction of the dams began through four federal authorizations... totaling about $11 million. Of the 343 dams currently classified as high hazard, Scattered across Texas are almost 2,000 nondescript, earthen dams built on private land to protect property, roads, and bridges from flood damages. Some of these dams...

  17. SPEAK4IT: MULTIMODAL INTERACTION IN THE WILD MICHAEL JOHNSTON AND PATRICK EHLEN

    E-Print Network [OSTI]

    Fisher, Kathleen

    to specifying queries by voice (e.g., "bike repair shops near the Golden Gate Bridge") users can combine speech

  18. Speak4it: Multimodal Interaction for Local Search Patrick Ehlen

    E-Print Network [OSTI]

    Fisher, Kathleen

    . In addition to specifying queries by voice (e.g., "bike repair shops near the golden gate bridge") users can

  19. Data quality assurance and performance measurement of data mining for preventive maintenance of power grid

    E-Print Network [OSTI]

    Wu, Leon

    2011-01-01T23:59:59.000Z

    Ensuring reliability as the electrical grid morphs into the "smart grid" will require innovations in how we assess the state of the grid, for the purpose of proactive maintenance, rather than reactive maintenance; in the ...

  20. Project Profile: Maintenance-Free Stirling Engine for High-Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance-Free Stirling Engine for High-Performance Dish CSP Project Profile: Maintenance-Free Stirling Engine for High-Performance Dish CSP Image of a prototype 30-kW Stirling...

  1. Innovative Contracting Strategies forInnovative Contracting Strategies for Transportation MaintenanceTransportation Maintenancepp

    E-Print Network [OSTI]

    Texas at Austin, University of

    Innovative Contracting Strategies forInnovative Contracting Strategies for TransportationResearch Methodology Research Findings and DeliverablesResearch Findings and Deliverables Maintenance Contracting Strategy Selection Framework Maintenance Contracting Strategy Selection Guide Case St dies on Inno ati e

  2. RFI Seeks Feedback on Third-party Maintenance Strategy for AMO...

    Energy Savers [EERE]

    RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools July 28, 2014 -...

  3. Policy #1001 Development, Approval and Maintenance of University Policy 1 OLD DOMINION UNIVERSITY

    E-Print Network [OSTI]

    Policy #1001 ­ Development, Approval and Maintenance of University Policy 1 OLD DOMINION UNIVERSITY University Policy Policy #1001 DEVELOPMENT, APPROVAL AND MAINTENANCE OF UNIVERSITY POLICY Responsible 4, 2012 A. PURPOSE This policy defines the process for developing, reviewing, approving

  4. Recompile if your codes run into MPICH error after the maintenance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Recompile if your codes run into MPICH errors after the maintenance on 6252014 Recompile if your codes run into MPICH error after the maintenance on 6252014 June 27, 2014 (0...

  5. Automated ground maintenance and health management for autonomous unmanned aerial vehicles

    E-Print Network [OSTI]

    Dale, Daniel R., M. Eng. Massachusetts Institute of Technology

    2007-01-01T23:59:59.000Z

    Automated ground maintenance is a necessity for multi-UAV systems. Without such automation, these systems will become more of a burden than a benefit as human operators struggle to contend with maintenance operations for ...

  6. Steam turbine restart temperature maintenance system and method

    SciTech Connect (OSTI)

    McClelland, T.R.

    1986-04-29T23:59:59.000Z

    A restart temperature maintenance system is described for a steam turbine system; the steam turbine system comprising a steam turbine, the turbine including a rotation shaft, an outer metal shell means. The restart temperature maintenance system consists of: (a) fastener means affixed to the outer surface of the shell means at predetermined positions; (b) air gap spacer means affixed to the outer surface of the shell means, the air gap spacer means substantially covering the shell means; (c) a plurality of electric heating blanket means of predetermined size and shape positioned in insulative relationship over the air gap spacer means and the heating blanket means maintained in predetermined position by the fastener means; (d) heat sensor means affixed to the outer metal shell means of the steam turbine in predetermined position; (e) power supply means for supplying power to the heating blanket means; (f) heat sensor monitor and controller means connected in circuit between the power supply means and the heat sensor means.

  7. Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated

    E-Print Network [OSTI]

    Boyer, Edmond

    Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem study on joint production and preventive maintenance scheduling strategies regarding flowshop problems, Preventive maintenance, Joint scheduling, GA, Taboo search, NEH heuristic, Flowshop. 1. Introduction

  8. SCHEDULED AND SHM STRUCTURALAIRFRAME MAINTENANCE APPLICATIONS USING A NEW PROBABILISTIC MODEL

    E-Print Network [OSTI]

    Boyer, Edmond

    philosophies have therefore evolved towards the preventive condition-based maintenance [3,4]. This conceptSCHEDULED AND SHM STRUCTURALAIRFRAME MAINTENANCE APPLICATIONS USING A NEW PROBABILISTIC MODEL LĂ©a D.cot@insa-toulouse.fr ABSTRACT This paper focuses on aircraft structure maintenance. A general mathematical framework based

  9. `ODDS ALGORITHM'-BASED OPPORTUNITY-TRIGGERED PREVENTIVE MAINTENANCE WITH PRODUCTION POLICY

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 `ODDS ALGORITHM'-BASED OPPORTUNITY-TRIGGERED PREVENTIVE MAINTENANCE WITH PRODUCTION POLICY THOMAS.monnin}@cran.uhp-nancy.fr Abstract: In the field of manufacturing, the planning of opportunistic preventive maintenance actions' (Bruss algorithm), opportunistic preventive maintenance. 1. INTRODUCTION With today's growing demand

  10. Optimizing with constraints: a case study in scheduling maintenance of electric power units

    E-Print Network [OSTI]

    Dechter, Rina

    industry is that of optimally schedul­ ing preventative maintenance of power generating units within of the electric power industry: optimally scheduling preventative maintenance of power generating units within or two dozen power generating units which can be individually scheduled for preventive maintenance. Both

  11. GENERATION D'INDICATEURS DANS LE CADRE D'UNE POLITIQUE DE MAINTENANCE PREVENTIVE CONDITIONNELLE

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    GENERATION D'INDICATEURS DANS LE CADRE D'UNE POLITIQUE DE MAINTENANCE PREVENTIVE CONDITIONNELLE Indicators generation as part of a policy of conditional preventive maintenance Pascal VRIGNAT, Manuel AVILA DE MAINTENANCE PREVENTIVE CONDITIONNELLE, Tours : France (2012)" #12;- le système se dégrade

  12. Methodology for assessing system performance loss within a proactive maintenance framework

    E-Print Network [OSTI]

    Boyer, Edmond

    role, the practices are required to move from corrective maintenance to preventive and even proactiveMethodology for assessing system performance loss within a proactive maintenance framework P,alexandre.voisin,eric.levrat,benoit.iung}@cran.uhp-nancy.fr) Abstract: Maintenance plays now a critical role

  13. A Tool to Support Knowledge Based Software Maintenance: The Software Service Jonathan I. Maletic

    E-Print Network [OSTI]

    Maletic, Jonathan I.

    ]: · Corrective · Perfective · Adaptive · Preventive/ Preservation Corrective maintenance is the correction, and corrective were originally used by Swanson [15]. Preventive maintenance is done to improve the future,8,14,12] and preventive maintenance is rarely done. However, it is assumed that a good software development methodology

  14. MTTF of a 1 out of n system with preventive maintenance Christiane CocozzaThivent

    E-Print Network [OSTI]

    Cocozza-Thivent, Christiane

    MTTF of a 1 out of n system with preventive maintenance Christiane Cocozza­Thivent Universit´e de. The working item is submitted to an age preventive maintenance: when this item reachs age a, it is replaced by a waiting item if there is one. If not the system fails. The duration of the preventive maintenance is equal

  15. LS-SVM based regression and spectral clustering for predicting maintenance of machines

    E-Print Network [OSTI]

    with sensory3 faults have been used [? ],[? ],[? ]: corrective maintenance, preventive main-4 tenance, manual the machine fails, it is expensive and6 safety and environmental issues arise. Preventive maintenance is basedLS-SVM based regression and spectral clustering for predicting maintenance of machines Rocco

  16. How Much Does Unused Code Matter for Maintenance? Sebastian Eder, Maximilian Junker, Elmar Jurgens, Benedikt Hauptmann

    E-Print Network [OSTI]

    effort can thus be expected to be low. On the other hand, however, preventive and adaptive maintenance [3. The remaining changes comprise adaptive and preventive maintenance. We thus have to expect unnecessary codeHow Much Does Unused Code Matter for Maintenance? Sebastian Eder, Maximilian Junker, Elmar J

  17. Condition based maintenance model for a production deteriorating Phuc Do Van and Christophe Berenguer

    E-Print Network [OSTI]

    Boyer, Edmond

    significantly and the system might not be able to cope with demand. In many preventive maintenance policiesCondition based maintenance model for a production deteriorating system Phuc Do Van and Christophe both maintenance cost and production capacity aspects for a single unit production system whose

  18. Optimizing with constraints: a case study in scheduling maintenance of electric power units

    E-Print Network [OSTI]

    Dechter, Rina

    is that of optimally schedul- ing preventative maintenance of power generating units within a power plant. We show how: optimally scheduling preventative maintenance of power generating units within a power plant. We de ne can be individually scheduled for preventive maintenance. Both the required duration of each unit

  19. Optimisation par algorithme gntique de la maintenance prventive dans un contexte de modlisation par modles

    E-Print Network [OSTI]

    Boyer, Edmond

    would be to apply a preventive maintenance in order to limit or even prevent system breakdowns (failures). But if the preventive maintenance is not properly regulated, we risk to face excessive costs and unnecessary system downtime. Given this situation, we should so consider establishing preventive maintenance strategies

  20. Advanced Maintenance Modelling StatAvaries : An original multinet decision support tool for

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    the use of the preventive maintenance strategies on the availability of the network whereas the last model and preventive maintenance actions to delays before broken rails detection and related number of missed trains (aAdvanced Maintenance Modelling 1 StatAvaries : An original multinet decision support tool

  1. Leon County Extension -615 Paul Russell Rd. -Tallahassee Limited Commercial Landscape Maintenance Certification

    E-Print Network [OSTI]

    Watson, Craig A.

    Leon County Extension - 615 Paul Russell Rd. - Tallahassee Limited Commercial Landscape Maintenance Certification Training Class & Exam Wednesday, March 21, 2012 If you work for a commercial landscape maintenance requires that you have a limited commercial landscape maintenance certification. To take the test

  2. Low-maintenance Landscape Plants for South Florida Jody Haynes1

    E-Print Network [OSTI]

    Jawitz, James W.

    Low-maintenance Landscape Plants for South Florida Jody Haynes1 , John McLaughlin2 , Laura Vasquez3 landscape plants suitable for south Florida. The resulting list includes over 350 low-maintenance plants in the Florida Yards & Neighborhoods (FYN) program in Miami-Dade County for a list of recommended low-maintenance

  3. Problem Solution Results Conclusion Predictive maintenance for the heated hold-up tank

    E-Print Network [OSTI]

    De Saporta, Benoîte

    Problem Solution Results Conclusion Predictive maintenance for the heated hold-up tank B. de, Helsinki Predictive maintenance for the heated hold-up tank #12;Problem Solution Results Conclusion Outline 1 Maintenance problem The heated hold-up tank Optimization problem 2 Numerical solution Mathematical

  4. The Engineered Approach to Energy and Maintenance Effective Steam Trapping

    E-Print Network [OSTI]

    Krueger, R. G.; Wilt, G. W.

    1980-01-01T23:59:59.000Z

    ., Chemical Engineering 9/1/75. 4. Maintenance Engineering, May 1976. 5. "How Much Does Lost Steam Cost",Armstrong Machine works, Hydrocarbon Processing, p.129, Jan. 1976. 6. "Setter Steam Trapping Cuts Energy Waste", wesley Yates, Yarway Corp..., Georgia Tech Industrial Energy Extension Service, Chemical Engineering, 2/11/80. 10. ''Basic Facts & Enerqv Saving Tips" ,Lawrence R. O'Dell, Armstrong Machine Works, Heating/Piping/ Air Conditioning, May 1977. 11. Steam Trap Report - Energy Loss...

  5. Object-oriented development of EMS maintenance and documentation tools

    SciTech Connect (OSTI)

    Sanders, C.W. [Entergy Services, Inc., Pine Bluff, AR (United States). Power System Operations Dept.

    1995-12-31T23:59:59.000Z

    This paper describes the use of an object-oriented application framework to implement a PC-based tool kit for use by EMS software support personnel in software maintenance activities including training, documentation development, and trouble-analysis. In addition to a description of the development of the underlying code which provides the tool kit functionality, the paper describes the steps necessary to instantiate the tool kit on a given EMS subsystem.

  6. ExxonMobil Olefins Plant Projects, Maintenance and Optimizations

    E-Print Network [OSTI]

    Neely, M. M.

    2014-01-01T23:59:59.000Z

    are endothermic and there are drastic differences in temperature and pressure across the process Quench & Heat Recovery Steam Cracker Furnace Compression Refrigeration Fractionation Cracked Products ProductsFeed Fuel 60% 35% 5% Ethylene Plant Energy Consumption...ExxonMobil Olefins Plant Projects, Maintenance and Optimizations Matt Neely Utilities Coordinator ExxonMobil Baytown Olefins Plant 2014 IETC May 21, 2014 ESL-IE-14-05-02 Proceedings of the Thrity-Sixth Industrial Energy Technology Conference New...

  7. Open source software development and maintenance: an exploratory analysis

    E-Print Network [OSTI]

    Raja, Uzma

    2009-06-02T23:59:59.000Z

    .3 Significance of Software Development and Maintenance Research. 6 1.4 Research Scope???????????????????? 7 1.5 Organization of this Dissertation?????????????. 9 II PROJECT VIABILITY: A MULTIDIMENSIONAL MEASURE?. 10 2... ???????. 89 4.7 Acceptable ranges of ROC value?????????????????. 90 4.8 Classification for the LR model?????????????????? 93 4.9 Process related variable measurement and sources?????????? 99 xi TABLE Page 4.10 Product related variable...

  8. Community Wind Handbook/Plan for Maintenance | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentratingRenewable Solutions LLC Jump to: navigation, search Name: Communityfor Maintenance <

  9. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01T23:59:59.000Z

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  10. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01T23:59:59.000Z

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  11. Brain necrosis after fractionated radiation therapy: Is the halftime for repair longer than we thought?

    SciTech Connect (OSTI)

    Bender, Edward T. [Department of Human Oncology, University of Wisconsin-Madison, School of Medicine and Public Health, 600 Highland Avenue, Madison, Wisconsin 53792 (United States)

    2012-11-15T23:59:59.000Z

    Purpose: To derive a radiobiological model that enables the estimation of brain necrosis and spinal cord myelopathy rates for a variety of fractionation schemes, and to compare repair effects between brain and spinal cord. Methods: Sigmoidal dose response relationships for brain radiation necrosis and spinal cord myelopathy are derived from clinical data using nonlinear regression. Three different repair models are considered and the repair halftimes are included as regression parameters. Results: For radiation necrosis, a repair halftime of 38.1 (range 6.9-76) h is found with monoexponential repair, while for spinal cord myelopathy, a repair halftime of 4.1 (range 0-8) h is found. The best-fit alpha beta ratio is 0.96 (range 0.24-1.73)Conclusions: A radiobiological model that includes repair corrections can describe the clinical data for a variety of fraction sizes, fractionation schedules, and total doses. Modeling suggests a relatively long repair halftime for brain necrosis. This study suggests that the repair halftime for late radiation effects in the brain may be longer than is currently thought. If confirmed in future studies, this may lead to a re-evaluation of radiation fractionation schedules for some CNS diseases, particularly for those diseases where fractionated stereotactic radiation therapy is used.

  12. E-Print Network 3.0 - activation repairs endothelial Sample Search...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    aorta of the normal rabbit exhibits focal sites Summary: to repair this injury. Because fluid mechanical forces regulate such fundamental endothelial processes... PF. Shear...

  13. E-Print Network 3.0 - auto body repair Sample Search Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Repair Your source ... Source: Braun, Paul - Department of Materials Science and Engineering, University of Illinois at Urbana-Champaign Collection: Materials Science 3 A Case...

  14. Development of Baseline Monthly Utility Models, Stabilization of Data Logging Environment and Development of Metering Plan and Shopping List for Fort Hood, Texas

    E-Print Network [OSTI]

    Saman, N. F.; Reddy, T. A.; Haberl, J. S.; Claridge, D. E.; Turner, W. D.

    1995-01-01T23:59:59.000Z

    sensors) at *ue west substation, and the installation of the ESL's Monitor software for use by the Energy Office at the base. The objective of Task C is to provide a metering plan and shopping list of necessary data points to provide CERL with energy... and EModel, and it was found that EModel gave more accurate modeling results than PRISM, and therefore EModel was used in the analysis. For Task B, a weather station that includes temperature, humidity and solar sensors was installed at the west substation...

  15. Repair welding of fusion reactor components. Final technical report

    SciTech Connect (OSTI)

    Chin, B.A.; Wang, C.A.

    1997-09-30T23:59:59.000Z

    The exposure of metallic materials, such as structural components of the first wall and blanket of a fusion reactor, to neutron irradiation will induce changes in both the material composition and microstructure. Along with these changes can come a corresponding deterioration in mechanical properties resulting in premature failure. It is, therefore, essential to expect that the repair and replacement of the degraded components will be necessary. Such repairs may require the joining of irradiated materials through the use of fusion welding processes. The present ITER (International Thermonuclear Experimental Reactor) conceptual design is anticipated to have about 5 km of longitudinal welds and ten thousand pipe butt welds in the blanket structure. A recent study by Buende et al. predict that a failure is most likely to occur in a weld. The study is based on data from other large structures, particularly nuclear reactors. The data used also appear to be consistent with the operating experience of the Fast Flux Test Facility (FFTF). This reactor has a fuel pin area comparable with the area of the ITER first wall and has experienced one unanticipated fuel pin failure after two years of operation. The repair of irradiated structures using fusion welding will be difficult due to the entrapped helium. Due to its extremely low solubility in metals, helium will diffuse and agglomerate to form helium bubbles after being trapped at point defects, dislocations, and grain boundaries. Welding of neutron-irradiated type 304 stainless steels has been reported with varying degree of heat-affected zone cracking (HAZ). The objectives of this study were to determine the threshold helium concentrations required to cause HAZ cracking and to investigate techniques that might be used to eliminate the HAZ cracking in welding of helium-containing materials.

  16. Blade reliability collaborative : collection of defect, damage and repair data.

    SciTech Connect (OSTI)

    Ashwill, Thomas D.; Ogilvie, Alistair B.; Paquette, Joshua A.

    2013-04-01T23:59:59.000Z

    The Blade Reliability Collaborative (BRC) was started by the Wind Energy Technologies Department of Sandia National Laboratories and DOE in 2010 with the goal of gaining insight into planned and unplanned O&M issues associated with wind turbine blades. A significant part of BRC is the Blade Defect, Damage and Repair Survey task, which will gather data from blade manufacturers, service companies, operators and prior studies to determine details about the largest sources of blade unreliability. This report summarizes the initial findings from this work.

  17. Practical Maintenance of Digital Systems: Guidance to Maximize the Benefits of Digital Technology for the Maintenance of Digital Systems and Plant Equipment

    SciTech Connect (OSTI)

    Hill, D; Scarola, K

    2004-10-30T23:59:59.000Z

    This report presents detailed guidance for the maintenance and testing of modern digital systems. The guidance provides practical means for plants to take advantage of the increased diagnostic and self-test capabilities of these systems. It helps plants avoid mistakes in design and installation that could lead to increased maintenance burden and decreased system reliability and availability.

  18. DOE-EM-45 PACKAGING OPERATIONS AND MAINTENANCE COURSE

    SciTech Connect (OSTI)

    Watkins, R.; England, J.

    2010-05-28T23:59:59.000Z

    Savannah River National Laboratory - Savannah River Packaging Technology (SRNL-SRPT) delivered the inaugural offering of the Packaging Operations and Maintenance Course for DOE-EM-45's Packaging Certification Program (PCP) at the University of South Carolina Aiken on September 1 and 2, 2009. Twenty-nine students registered, attended, and completed this training. The DOE-EM-45 Packaging Certification Program (PCP) sponsored the presentation of a new training course, Packaging Maintenance and Operations, on September 1-2, 2009 at the University of South Carolina Aiken (USC-Aiken) campus in Aiken, SC. The premier offering of the course was developed and presented by the Savannah River National Laboratory, and attended by twenty-nine students across the DOE, NNSA and private industry. This training informed package users of the requirements associated with handling shipping containers at a facility (user) level and provided a basic overview of the requirements typically outlined in Safety Analysis Report for Packaging (SARP) Chapters 1, 7, and 8. The course taught packaging personnel about the regulatory nature of SARPs to help reduce associated and often costly packaging errors. Some of the topics covered were package contents, loading, unloading, storage, torque requirements, maintaining records, how to handle abnormal conditions, lessons learned, leakage testing (including demonstration), and replacement parts. The target audience for this course was facility operations personnel, facility maintenance personnel, and field quality assurance personnel who are directly involved in the handling of shipping containers. The training also aimed at writers of SARP Chapters 1, 7, and 8, package designers, and anyone else involved in radioactive material packaging and transportation safety. Student feedback and critiques of the training were very positive. SRNL will offer the course again at USC Aiken in September 2010.

  19. NPP operation and maintenance with French-built NPPs

    SciTech Connect (OSTI)

    Mira, J.J.; Charbonneau, S.

    1988-01-01T23:59:59.000Z

    In France, 80% of the electricity production will be nuclear in 1990. More than to-day, PWR units will be operated by Electricite de France on a load-follow basis. Every effort is made to reduce planned and forced outages. Maintenance is shared between EdF and Framatome, the latter being in charge of high technology operations. All these actions are eased by the standardization of units, within each power class, the resulting build-up of experience being available to all PWR operators in the world, more particularly those of Framatome-built units.

  20. Standard hydrogen monitoring system-B operation and maintenance manual

    SciTech Connect (OSTI)

    Bender, R.M.

    1995-01-25T23:59:59.000Z

    The purpose of this document is to provide information for the operation and maintenance of the Standards Hydrogen Monitoring System-B (SHMS-B) used in the 200E and 200W area tank farms on the Hanford site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. The primary function of the SHMS-B is to monitor specifically for hydrogen in the waste tank vapor space which may also contain unknown quantities of other gaseous constituents.

  1. Plant maintenance and plant life extension issue, 2007

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2007-03-15T23:59:59.000Z

    The focus of the March-April issue is on plant maintenance and plant life extension. Major articles/reports in this issue include: Three proposed COLs expected in 2007, by Dale E. Klein, U.S. Nuclear Regulatory Commission; Delivering behaviors that our customers value, by Jack Allen, Westinghouse Electric Company; Facilitating high-level and fuel waste disposal technologies, by Malcolm Gray, IAEA, Austria; Plant life management and long-term operation, by Pal Kovacs, OECD-NEA, France; Measuring control rod position, by R. Taymanov, K. Sapozhnikova, I. Druzhinin, D.I. Mendeleyev, Institue for Metrology, Russia; and, 'Modernization' means higher safety, by Svetlana Genova, Kozluduy NPP plc, Bulgaria.

  2. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministration -Lowellfor 2013 | Jefferson Lab Maintenance

  3. Identification and Dissection of a Complex DNA Repair Sensitivity Phenotype in Baker's Yeast

    E-Print Network [OSTI]

    Kruglyak, Leonid

    Identification and Dissection of a Complex DNA Repair Sensitivity Phenotype in Baker's Yeast Ann-assisted bulk segregant analysis, we identified one other locus, MKT1, and a QTL on Chromosome VII that also) Identification and Dissection of a Complex DNA Repair Sensitivity Phenotype in Baker's Yeast. PLoS Genet 4(7): e

  4. Lazy Means Smart: Reducing Repair Bandwidth Costs in Erasure-coded Distributed Storage

    E-Print Network [OSTI]

    Alvisi, Lorenzo

    - ditional bandwidth savings. 1. INTRODUCTION Erasure coding schemes, e.g. Reed-Solomon (RS) codes on the example of Reed-Solomon codes, and then explain the repair bandwidth problem. In an RS(n,k) stor- age scheme. 4. EVALUATION METHODOLOGY Evaluating the efficacy of lazy recovery in reducing repair bandwidth

  5. A Centralized, TreeBased Approach to Network Repair Service for Multicast Streaming Media

    E-Print Network [OSTI]

    Maxemchuk, Nicholas F.

    transmission, and can forward (via unicast) packets to other repair servers that did not receive the packets via the original transmission. After a fixed delay on the order of several seconds, a repair server with a transmission that is delayed by a few seconds relative to the original multicast session. However, this delayed

  6. 4 CONCRETE REPAIR BULLETIN MAY/JUNE2001 Laser Profilometry for

    E-Print Network [OSTI]

    Maerz, Norbert H.

    4 CONCRETE REPAIR BULLETIN MAY/JUNE2001 Laser Profilometry for Concrete Substrate Characterization and resins are non- corrosive, they are ideally suited for the repair and retrofitting of concrete bridges highly upon the quality of the bond between the concrete and the laminate. Experience has shown that when

  7. Optimizing Repair Programs for Consistent Query Answering Monica Caniupan and Leopoldo Bertossi

    E-Print Network [OSTI]

    Bertossi, Leopoldo

    , a logic programming system that implements the stable models semantics, in particular. We also analyze be restored minimally by inserting Q(a) or elim- inating S(a). The repair program contains the following 1Optimizing Repair Programs for Consistent Query Answering Monica Caniupan and Leopoldo Bertossi

  8. Maintenance Testing of Mixed-Signal Boards: the FCB Technical Report LiSyc, UBO Brest (France), June 2005

    E-Print Network [OSTI]

    Boyer, Edmond

    a part of his work. In maintenance, one may distinguish preventive maintenance from corrective1 Maintenance Testing of Mixed-Signal Boards: the FCB case study Technical Report LiSyc, UBO Brest, Fax: +33 298 340 986 bruno.castel@isismpp.fr Keywords: Maintenance testing, mixed-signal board testing

  9. IEEE TRANSACTIONS ON RELIABILITY, VOL. 59, NO. 2, JUNE 2010 393 Optimal Maintenance Strategies for Wind Turbine

    E-Print Network [OSTI]

    Ding, Yu

    and maintenance. ACRONYMS NA no action PM preventive maintenance OB observation CM corrective maintenance OIEEE TRANSACTIONS ON RELIABILITY, VOL. 59, NO. 2, JUNE 2010 393 Optimal Maintenance Strategies decisions. Based on the information from sensors, our research objective is to derive an optimal preventive

  10. Dynamic grouping maintenance strategy with time limited opportunities Phuc Do Van, Florent Brissaud, Anne Barros, Christophe Berenguer

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    . Preventive maintenance durations and occurrences of main- tenance activities within the scheduling horizon by taking into account both the preventive maintenance durations and the occur- rences of maintenance of a system is often an opportunity to com- bine preventive and corrective maintenance. This is especially

  11. TRANSPORT...18 SHOPPING...22

    E-Print Network [OSTI]

    Brierley, Andrew

    of renewable energy sources, paying attention to the environmental impact of our activities, and setting after the golden days of economic growth, without regard for ecological consequences. Yet I am pleased are having both close to home, and upon some of the most vulnerable members of society across the world

  12. Injection repair of carbon fiber/bismaleimide composite panels with bisphenol E cyanate ester resin

    SciTech Connect (OSTI)

    Thunga, Mahendra [Ames Laboratory; Bauer, Amy [Iowa State University; Obusek, Kristine [Fleet Readiness Center East; Meilunas, Ray [Naval Air Warfare Center Aircraft Division; Akinc, Mufit [Ames Laboratory; Kessler, Michael R [Ames Laboratory

    2014-08-01T23:59:59.000Z

    Resin injection of bisphenol E cyanate ester, a low viscosity resin that cures into a high temperature thermoset polymer, is investigated as a reliable repair method to restore strength and stiffness in delaminated carbon fiber/bismaleimide composites used in aircraft panels. The influence of temperature on the viscosity of the uncured resin was measured to optimize the injection conditions for high resin infiltration into the delaminations. The repair efficiency of the resin was evaluated by varying the panel thickness and the method by which the delamination damage was created in the composite specimens. Ultrasonic scanning (C-scan), flash thermography images, and cross-section analysis of repaired panels revealed excellent resin infiltration into the damaged region. Evaluation of mechanical repair efficiency using both bending stiffness and in-plain compressive strength of the composite panels as the repair metrics showed values exceeding 100%.

  13. Repair of gamma-ray-induced DNA base damage in xeroderma pigmentosum cells

    SciTech Connect (OSTI)

    Fornace, A.J. Jr.; Dobson, P.P.; Kinsella, T.J.

    1986-04-01T23:59:59.000Z

    The repair of DNA damage produced by /sup 137/Cs gamma irradiation was measured with a preparation from Micrococcus luteus containing DNA damage-specific endonucleases in combination with alkaline elution. The frequency of these endonuclease sensitive sites (ESS) was determined after 54 or 110 Gy of oxic irradiation in normal and xeroderma pigmentosum (XP) fibroblasts from complementation groups A, C, D, and G. Repair was rapid in all cell strains with greater than 50% repair after 1.5 h of repair incubation. At later repair times, 12-17 h, more ESS remained in XP than in normal cells. The frequency of excess ESS in XP cells was approximately 0.04 per 10(9) Da of DNA per Gy which was equivalent to 10% of the initial ESS produced. The removal of ESS was comparable in XP cells with normal radiosensitivity and XP3BR cells which have been reported to be moderately radiosensitive.

  14. Linac cryogenic distribution system maintenance and upgrades at JLab

    SciTech Connect (OSTI)

    Dixon, K.; Wright, M.; Ganni, V. [Thomas Jefferson National Accelerator Facility (JLab), Newport News, VA 23606 (United States)

    2014-01-29T23:59:59.000Z

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  15. Linac cryogenic distribution system maintenance and upgrades at Jlab

    SciTech Connect (OSTI)

    Dixon, Kelly D. [JLAB; Wright, Mathew C. [JLAB; Ganni, Venkatarao [JLAB

    2014-01-01T23:59:59.000Z

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  16. Experience in the repair of steam generator auxiliary feedwater nozzle

    SciTech Connect (OSTI)

    Chao, K.K.N. [Consumers Power Co., Jackson, MI (United States)

    1996-12-01T23:59:59.000Z

    The auxiliary feedwater nozzle is quite often subjected to more thermal stress cycles and other loading mechanisms during their service life than the material was designed and fabricated for at the nozzle of the earlier steam generators in many nuclear plants. During plant operation, the auxiliary feedwater nozzle outlet is exposed to the hot steam from the generator side, while the auxiliary feedwater piping which contains subcooled water from the inlet often induces water hammer as a result of the steam-water mixing phenomena. The thermal cycles and the steam bubble collapse at the nozzle may cause cracking in the nozzle liner and interior surface of the nozzle, and subsequently results in structural damage to the steam generator. This presentation is intended to share the lessons learned from the evaluation of the nozzle condition and the subsequent modification and repair made to the auxiliary feedwater nozzle at the Palisades Nuclear Plant. Other nuclear plant owners may benefit from this experience.

  17. Method of tissue repair using a composite material

    DOE Patents [OSTI]

    Hutchens, Stacy A; Woodward, Jonathan; Evans, Barbara R; O'Neill, Hugh M

    2014-03-18T23:59:59.000Z

    A composite biocompatible hydrogel material includes a porous polymer matrix, the polymer matrix including a plurality of pores and providing a Young's modulus of at least 10 GPa. A calcium comprising salt is disposed in at least some of the pores. The porous polymer matrix can comprise cellulose, including bacterial cellulose. The composite can be used as a bone graft material. A method of tissue repair within the body of animals includes the steps of providing a composite biocompatible hydrogel material including a porous polymer matrix, the polymer matrix including a plurality of pores and providing a Young's modulus of at least 10 GPa, and inserting the hydrogel material into cartilage or bone tissue of an animal, wherein the hydrogel material supports cell colonization in vitro for autologous cell seeding.

  18. Online Monitoring to Enable Improved Diagnostics, Prognostics and Maintenance

    SciTech Connect (OSTI)

    Bond, Leonard J.

    2011-02-01T23:59:59.000Z

    For both existing and new plant designs there are increasing opportunities and needs for the application of advanced online surveillance, diagnostic and prognostic techniques. These methods can continuously monitor and assess the health of nuclear power plant systems and components. The added effectiveness of such programs has the potential to enable holistic plant management, and minimize exposure to future and unknown risks. The 'NDE & On-line Monitoring' activities within the Advanced Instrumentation, Information and Control Systems (II&CS) Pathway are developing R&D to establish advanced condition monitoring and prognostics technologies to understand and predict future phenomena, derived from plant aging in systems, structures, and components (SSC). This research includes utilization of the enhanced functionality and system condition awareness that becomes available through the application of digital technologies at existing nuclear power plants for online monitoring and prognostics. The current state-of-the-art for on-line monitoring applied to active components (eg pumps, valves, motors) and passive structure (eg core internals, primary piping, pressure vessel, concrete, cables, buried pipes) is being reviewed. This includes looking at the current deployment of systems that monitor reactor noise, acoustic signals and vibration in various forms, leak monitoring, and now increasingly condition-based maintenance (CBM) for active components. The NDE and on-line monitoring projects are designed to look beyond locally monitored CBM. Current trends include centralized plant monitoring of SSC, potential fleet-based CBM and technology that will enable operation and maintenance to be performed with limited on-site staff. Attention is also moving to systems that use online monitoring to permit longer term operation (LTO), including a prognostic or predictive element that estimates a remaining useful life (RUL). Many, if not all, active components (pumps, valves, motors etc.) can be well managed, routinely diagnosed, analyzed and upgraded as needed using a combination of periodic and online CBM. The ability to successfully manage passive systems and structures is seen as the key to LTO, particularly in the USA. New approaches will be demonstrated, including prognostics for passive structures, which is critical to maintaining safety and availability and to reducing operations and maintenance costs for NPP's. To provide proactive on-line monitoring that includes estimates for RUL new projects will include advanced sensors, better understanding of stressors and challenges faced in quantification of uncertainty associated with RUL. This program area will leverage insights from past experience in other industries and seek to demonstrate the feasibility of on-line monitoring and prognostics to support NPP LTO.

  19. Neurological Complications Following Endoluminal Repair of Thoracic Aortic Disease

    SciTech Connect (OSTI)

    Morales, J. P.; Taylor, P. R.; Bell, R. E.; Chan, Y. C. [Guy's and St. Thomas' Foundation Hospital NHS Trust, Department of Vascular Surgery (United Kingdom); Sabharwal, T. [Guy's and St. Thomas' Foundation Hospital NHS Trust, Department of Interventional Radiology (United Kingdom); Carrell, T. W. G. [Guy's and St. Thomas' Foundation Hospital NHS Trust, Department of Vascular Surgery (United Kingdom); Reidy, J. F. [Guy's and St. Thomas' Foundation Hospital NHS Trust, Department of Interventional Radiology (United Kingdom)], E-mail: John.Reidy@gstt.nhs.uk

    2007-09-15T23:59:59.000Z

    Open surgery for thoracic aortic disease is associated with significant morbidity and the reported rates for paraplegia and stroke are 3%-19% and 6%-11%, respectively. Spinal cord ischemia and stroke have also been reported following endoluminal repair. This study reviews the incidence of paraplegia and stroke in a series of 186 patients treated with thoracic stent grafts. From July 1997 to September 2006, 186 patients (125 men) underwent endoluminal repair of thoracic aortic pathology. Mean age was 71 years (range, 17-90 years). One hundred twenty-eight patients were treated electively and 58 patients had urgent procedures. Anesthesia was epidural in 131, general in 50, and local in 5 patients. Seven patients developed paraplegia (3.8%; two urgent and five elective). All occurred in-hospital apart from one associated with severe hypotension after a myocardial infarction at 3 weeks. Four of these recovered with cerebrospinal fluid (CSF) drainage. One patient with paraplegia died and two had permanent neurological deficit. The rate of permanent paraplegia and death was 1.6%. There were seven strokes (3.8%; four urgent and three elective). Three patients made a complete recovery, one had permanent expressive dysphasia, and three died. The rate of permanent stroke and death was 2.1%. Endoluminal treatment of thoracic aortic disease is an attractive alternative to open surgery; however, there is still a risk of paraplegia and stroke. Permanent neurological deficits and death occurred in 3.7% of the patients in this series. We conclude that prompt recognition of paraplegia and immediate insertion of a CSF drain can be an effective way of recovering spinal cord function and improving the prognosis.

  20. Maintenance Awareness in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac J. Sreenan

    E-Print Network [OSTI]

    Roedig, Utz

    Maintenance Awareness in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac J. Sreenan Mobile & Internet Systems Laboratory (MISL), University College Cork, Ireland Email: {a.barroso, u

  1. Maintenance Efficient Routing in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac Sreenan

    E-Print Network [OSTI]

    Sreenan, Cormac J.

    Maintenance Efficient Routing in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac Sreenan Mobile & Internet Systems Laboratory, University College Cork, Ireland Email: {a.barroso u

  2. Chapter 51 Attainment and Maintenance of the National Ambient Air Quality Standards (Kentucky)

    Broader source: Energy.gov [DOE]

    Kentucky Administrative Regulation Chapter 51, entitled Attainment and Maintenance of the National Ambient Air Quality Standards, is promulgated under the authority of the Division of Air Quality...

  3. DOE Order Self Study Modules - DOE O 433.1B, Maintenance Management...

    Broader source: Energy.gov (indexed) [DOE]

    for the following maintenance-related terms? Corrective Preventive Reliability-centered Note: If you think that you can complete the practice at the end of this...

  4. E-Print Network 3.0 - activity maintenance study Sample Search...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    results for: activity maintenance study Page: << < 1 2 3 4 5 > >> 1 Innovative Contracting Strategies forInnovative Contracting Strategies for Transportation...

  5. E-Print Network 3.0 - aircraft maintenance workers Sample Search...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mathematics 97 Rev. No.: 2.0 Contractor Environmental Safety and Health Manual Title: LockoutTagout Program Summary: worker performing the servicing or maintenance, is provided...

  6. E-Print Network 3.0 - advanced integrated maintenance Sample...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Abstract One of the major concerns of any maintenance Source: Basili, Victor R. - Fraunhofer Center & Department of Computer Science, University of Maryland at College Park...

  7. E-Print Network 3.0 - advanced maintenance technology Sample...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Impact of RFID technologies on helicopter processes: Assessment on customer oriented Charlotte JIMENEZa,b Summary: maintenance process. Section 2 and 3 concentrate on the...

  8. Transportation cask decontamination and maintenance at the potential Yucca Mountain repository; Yucca Mountain Site characterization project

    SciTech Connect (OSTI)

    Hartman, D.J.; Miller, D.D. [Bechtel National, Inc., San Francisco, CA (United States); Hill, R.R. [Sandia National Labs., Albuquerque, NM (United States)

    1992-04-01T23:59:59.000Z

    This study investigates spent fuel cask handling experience at existing nuclear facilities to determine appropriate cask decontamination and maintenance operations at the potential Yucca Mountain repository. These operations are categorized as either routine or nonroutine. Routine cask decontamination and maintenance tasks are performed in the cask preparation area at the repository. Casks are taken offline to a separate cask maintenance area for major nonroutine tasks. The study develops conceptual designs of the cask preparation area and cask maintenance area. The functions, layouts, and major features of these areas are also described.

  9. Microsoft Word - CX-Colville-Republic-Maintenance-FY13_WEB.docx

    Broader source: Energy.gov (indexed) [DOE]

    3 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFSF-Bell Proposed Action: Routine maintenance on the Colville-Republic...

  10. E-Print Network 3.0 - aircraft maintenance personnel Sample Search...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Learn about the critical factors involved Summary: , operation and maintenance of aging aircraft n Anyone involved in the field of aviation emergency response... .S. public...

  11. Microsoft Word - CX-BigEddy-Redmond-ConductorMaintenance-FY13...

    Broader source: Energy.gov (indexed) [DOE]

    4, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Stacy Hensley Project Manager - TEP-CSB-2 Proposed Action: Conductor maintenance on Bonneville Power...

  12. Tribological Investigation of Mahua Oil Based Lubricant for Maintenance Applications

    E-Print Network [OSTI]

    Amit Suhane; A. Rehman; H. K. Khaira

    Limited crude reserves, consistently rising oil prices, unsafe disposal of the harmful lubricants and its guaranteed adverse aftereffects has increased concern for replenishing the environment. Development of environmental friendly lubricants and its appropriate usage is an option of prime importance which can overcome such problems. This paper investigates the prospects of Mahua oil based lubricant for maintenance applications. Mahua oil is blended with conventional gear oil (90T) in different ratios. Tribo pair used is plain carbon steel cylindrical pin and mild steel disc. Friction and wear parameters have been studied on Pin on Disc Tester under varying conditions. Worn out pins suggests pronounced abrasive and adhesive wear pattern under boundary film lubricated conditions. Experimentation reveals that addition of mahua oil blended with 90 T oil has good wear reducing traits apart from environmental benefits.

  13. Feasibility study for a transportation operations system cask maintenance facility

    SciTech Connect (OSTI)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01T23:59:59.000Z

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  14. Fabrication Flaw Density and Distribution In Repairs to Reactor Pressure Vessel and Piping Welds

    SciTech Connect (OSTI)

    GJ Schuster, FA Simonen, SR Doctor

    2008-04-01T23:59:59.000Z

    The Pacific Northwest National Laboratory is developing a generalized fabrication flaw distribution for the population of nuclear reactor pressure vessels and for piping welds in U.S. operating reactors. The purpose of the generalized flaw distribution is to predict component-specific flaw densities. The estimates of fabrication flaws are intended for use in fracture mechanics structural integrity assessments. Structural integrity assessments, such as estimating the frequency of loss-of-coolant accidents, are performed by computer codes that require, as input, accurate estimates of flaw densities. Welds from four different reactor pressure vessels and a collection of archived pipes have been studied to develop empirical estimates of fabrication flaw densities. This report describes the fabrication flaw distribution and characterization in the repair weld metal of vessels and piping. This work indicates that large flaws occur in these repairs. These results show that repair flaws are complex in composition and sometimes include cracks on the ends of the repair cavities. Parametric analysis using an exponential fit is performed on the data. The relevance of construction records is established for describing fabrication processes and product forms. An analysis of these records shows there was a significant change in repair frequency over the years when these components were fabricated. A description of repair flaw morphology is provided with a discussion of fracture mechanics significance. Fabrication flaws in repairs are characterized using optimized-access, high-sensitivity nondestructive ultrasonic testing. Flaw characterizations are then validated by other nondestructive evaluation techniques and complemented by destructive testing.

  15. DNA Repair Alterations in Children With Pediatric Malignancies: Novel Opportunities to Identify Patients at Risk for High-Grade Toxicities

    SciTech Connect (OSTI)

    Ruebe, Claudia E., E-mail: claudia.ruebe@uks.e [Department of Radiation Oncology, Saarland University, Homburg/Saar (Germany); Fricke, Andreas; Schneider, Ruth; Simon, Karin; Kuehne, Martin; Fleckenstein, Jochen [Department of Radiation Oncology, Saarland University, Homburg/Saar (Germany); Graeber, Stefan [Institute of Medical Biometrics, Epidemiology and Medical Informatics, Saarland University, Homburg/Saar (Germany); Graf, Norbert [Department of Pediatric Hematology and Oncology, Saarland University, Homburg/Saar (Germany); Ruebe, Christian [Department of Radiation Oncology, Saarland University, Homburg/Saar (Germany)

    2010-10-01T23:59:59.000Z

    Purpose: To evaluate, in a pilot study, the phosphorylated H2AX ({gamma}H2AX) foci approach for identifying patients with double-strand break (DSB) repair deficiencies, who may overreact to DNA-damaging cancer therapy. Methods and Materials: The DSB repair capacity of children with solid cancers was analyzed compared with that of age-matched control children and correlated with treatment-related normal-tissue responses (n = 47). Double-strand break repair was investigated by counting {gamma}H2AX foci in blood lymphocytes at defined time points after irradiation of blood samples. Results: Whereas all healthy control children exhibited proficient DSB repair, 3 children with tumors revealed clearly impaired DSB repair capacities, and 2 of these repair-deficient children developed life-threatening or even lethal normal-tissue toxicities. The underlying mutations affecting regulatory factors involved in DNA repair pathways were identified. Moreover, significant differences in mean DSB repair capacity were observed between children with tumors and control children, suggesting that childhood cancer is based on genetic alterations affecting DSB repair function. Conclusions: Double-strand break repair alteration in children may predispose to cancer formation and may affect children's susceptibility to normal-tissue toxicities. Phosphorylated H2AX analysis of blood samples allows one to detect DSB repair deficiencies and thus enables identification of children at risk for high-grade toxicities.

  16. Survey of Companies in Machine Health Monitoring and Maintenance Company Capability Software Application Modeling Technique

    E-Print Network [OSTI]

    Huang, Samuel H.

    Safety and Security Neural networks IVARA www.ivara.com · Reliability centered maintenance solutions IVARA.ERS (expert system) UNKNOWN Expert Systems Aladon www.aladon.co.uk · Reliability centered General Physics Corporation www.gpworldwide.com · Predictive maintenance · Equipment reliability

  17. Field of Pipe Dreams: Minimizing Maintenance Cost for Hand-Moved

    E-Print Network [OSTI]

    Morrow, James A.

    Field of Pipe Dreams: Minimizing Maintenance Cost for Hand-Moved Irrigation Systems February 6, 2006 1 #12;Page 2 of 12 Control #23 Contents 1 Field and pipe set layout 4 2 Pressure loss 4 2 uniformity requirement. We define `maintenance time' provisionally to be the number of 20-meter pipes

  18. COMPARING MAINTENANCE APPROACHES FOR TOKAMAK FUSION POWER PLANTS* Lester M. Waganer

    E-Print Network [OSTI]

    California at San Diego, University of

    desirable maintenance scheme and reactor design approach to consider for the next generation, advanced of fusion plants are extremely important as they directly determine the plant availability and, ultimately-AT power core2 is the design basis for this comparison. One possible maintenance approach is the in- situ

  19. Evaluating maintenance policies by quantitative modeling and analysis Enrico Zio1,2,*

    E-Print Network [OSTI]

    Boyer, Edmond

    concerning the stochastic crack growth of a generic mechanical component subject to fatigue degradation relevance of maintenance in all sectors of industry; the main reasons are: the extensive mechanization, in refineries the maintenance and operations departments are usually the largest (Dekker 1996) and in various

  20. MAINTENANCE APPROACHES FOR ARIES-CS COMPACT STELLARATOR POWER CORE , S. Malang2

    E-Print Network [OSTI]

    Raffray, A. René

    .R. Raffray1 and the ARIES Team 1 Center for Energy Research, 460 EBU-II, University of California-San Diego and maintenance ports have been conceptually defined. These are summarized in this paper. Blanket concepts of the coil system; (2) modular replacement approach through maintenance ports arranged between each pair

  1. A Queue Theory-Based Approach to Staff Software Maintenance Centers G. Antoniol

    E-Print Network [OSTI]

    Di Penta, Massimiliano

    A Queue Theory-Based Approach to Staff Software Maintenance Centers G. Antoniol , G. Casazza are changing the landscape of several different areas, ranging from infor- mation gathering/managing and commerce to software de- velopment, maintenance and evolution. Software compa- nies having a geographically

  2. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    Norm Stanley

    2011-02-01T23:59:59.000Z

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  3. Annual Steam System Maintenance Outage (2014) Beginning on Sunday, June 8th

    E-Print Network [OSTI]

    Firestone, Jeremy

    Annual Steam System Maintenance Outage (2014) Beginning on Sunday, June 8th at 12:00pm (Noon), the Central Utility Plant (CUP), which supplies steam service to over 100 buildings on the Newark campus, will be shut down for the annual Steam System Maintenance Outage. This effort is necessary each year to ensure

  4. A Comparison of Maintenance Cost, Labor Demands, and System Performance for LID and Conventional Stormwater Management

    E-Print Network [OSTI]

    operations and maintenance. Due to increasing requirements for more effective treatment of runoff, and a subsurface gravel wetland, to $11-$21 per kg/yr TSS removed for a wet pond, a dry pond, and a sand filter maintenance burdens (as measured by cost and personnel hours) and higher water quality treatment capabilities

  5. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    SciTech Connect (OSTI)

    Wang, Liping; Hong, Tianzhen

    2013-01-01T23:59:59.000Z

    Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensors used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct modeling with EnergyPlus, 2) using the energy management system feature of EnergyPlus, and 3) modifying EnergyPlus source code. The results demonstrated the importance of maintenance for HVAC systems on energy performance of buildings. The research is intended to provide a guideline to help practitioners and building operators to gain the knowledge of maintaining HVAC systems in efficient operations, and prioritize HVAC maintenance work plan. The paper also discusses challenges of modeling building maintenance issues using energy simulation programs.

  6. Risk based optimization of the frequency of EDG on-line maintenance at Hope Creek

    SciTech Connect (OSTI)

    Knoll, A. [Public Service Electric & Gas, Hancocks Bridge, NJ (United States); Samanta, P.K. [Brookhaven National Lab., Upton, NY (United States); Vesely, W.E. [Science Applications International, Dublin, OH (United States)

    1996-09-01T23:59:59.000Z

    This paper presents a study to optimize the frequency of on-line maintenance of the emergency diesel generators at Hope Creek. This study was directed towards identifying, analyzing, and modifying maintenance planning and scheduling practices to assure the high availability of emergency diesel generators. Input from application of a recently developed reliability model, from considerations of probabilistic safety assessment, plant-specific experience, insights from personnel involved in EDG maintenance, and other practical issues were used to define a maintenance schedule that balances its beneficial and adverse impacts. Conclusions resulted in feasible recommendations to optimize and reduce the frequency of diesel on-line maintenance, allowing additional resources to better maintain other equipment important to safety.

  7. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28T23:59:59.000Z

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  8. THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.

    2014-04-01T23:59:59.000Z

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

  9. Community-Minded Interns at Savannah River Site Help Area Residents in Need with Home Repairs

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – More than two dozen college interns who worked at the Savannah River Site (SRS) this summer joined other volunteers and headed into area neighborhoods to help people in need with home repairs.

  10. Use of CFRP Overlays to Repair Fatigue Damage in Steel Bridge Girders and Components

    E-Print Network [OSTI]

    Gangel, Regan Elisabeth

    2012-05-31T23:59:59.000Z

    Fatigue damage in steel girder bridges built prior to the mid-1980s is common due to distortion-induced fatigue. Different repair techniques have been developed and implemented to retrofit bridges of this era with existing fatigue damage...

  11. USE OF COMPOSITE MATERIALS TO REPAIR STEEL STRUCTURES VULNERABLE TO FATIGUE DAMAGE

    E-Print Network [OSTI]

    Alemdar, Fatih

    2010-01-01T23:59:59.000Z

    This study investigates mainly two different topics related to the use of CFRP's for strengthening and repair of steel bridges: the use of CFRP's to prevent damage in fatigue vulnerable welded connections prior to fatigue-crack initiation...

  12. Consistency Management with Repair Actions Christian Nentwich, Wolfgang Emmerich and Anthony Finkelstein

    E-Print Network [OSTI]

    van der Hoek, André

    Consistency Management with Repair Actions Christian Nentwich, Wolfgang Emmerich and Anthony Finkelstein Department of Computer Science University College London Gower Street, London WC1E 6BT, UK {c.nentwich,w.emmerich

  13. Project: UAF Utilities Waste Line Repairs Ch6 to Ch13 Project No: 2013101 UTWH

    E-Print Network [OSTI]

    Ickert-Bond, Steffi

    Project: UAF Utilities Waste Line Repairs Ch6 to Ch13 Project No: 2013101 UTWH Subject: Project Schedule Project Duration: May 27 to August 10, 2014 The sewer line will be constructed in phases

  14. E-Print Network 3.0 - aortic repair pushing Sample Search Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for: aortic repair pushing Page: << < 1 2 3 4 5 > >> 1 Mechanobiology of the Aortic Heart Valve Jonathan T. Butcher1 Summary: ;13:798-803 18. Deck JD, Thubrikar MJ, Schneider...

  15. Using 3D Painting to Build and Repair Parts | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    spray as an alternate way to repair or coat parts involved in oil and gas drilling and turbo machinery. Cold spray's future benefits include extended product lifespan and reduced...

  16. GENETIC AND MOLECULAR ANALYSIS OF DNA DAMAGE REPAIR AND TOLERANCE PATHWAYS.

    SciTech Connect (OSTI)

    SUTHERLAND, B.M.

    2001-07-26T23:59:59.000Z

    Radiation can damage cellular components, including DNA. Organisms have developed a panoply of means of dealing with DNA damage. Some repair paths have rather narrow substrate specificity (e.g. photolyases), which act on specific pyrimidine photoproducts in a specific type (e.g., DNA) and conformation (double-stranded B conformation) of nucleic acid. Others, for example, nucleotide excision repair, deal with larger classes of damages, in this case bulky adducts in DNA. A detailed discussion of DNA repair mechanisms is beyond the scope of this article, but one can be found in the excellent book of Friedberg et al. [1] for further detail. However, some DNA damages and paths for repair of those damages important for photobiology will be outlined below as a basis for the specific examples of genetic and molecular analysis that will be presented below.

  17. Tiny Terminators: New Micro-Robots Assemble, Repair Themselves and Are Surprisingly Strong

    Broader source: Energy.gov [DOE]

    Tiny robots that can assemble and repair themselves? Watch a video of Argonne National Laboratory's micro-robots that easily perform tasks that can challenge other robots, including moving objects that are larger than themselves.

  18. RESTORING A DAMAGED 16-YEAR -OLD INSULATING POLYMER CONCRETE DIKE OVERLAY: REPAIR MATERIALS AND TECHNOLOGIES.

    SciTech Connect (OSTI)

    SUGAMA,T.

    2007-01-01T23:59:59.000Z

    The objective of this program was to design and formulate organic polymer-based material systems suitable for repairing and restoring the overlay panels of insulating lightweight polymer concrete (ILPC) from the concrete floor and slope wall of a dike at KeySpan liquefied natural gas (LNG) facility in Greenpoint, Brooklyn, NY, just over sixteen years ago. It also included undertaking a small-scale field demonstration to ensure that the commercial repairing technologies were applicable to the designed and formulated materials.

  19. Endovascular Abdominal Aortic Aneurysm Repair in the Presence of a Kidney Transplant: Therapeutic Considerations

    SciTech Connect (OSTI)

    Karkos, Christos D., E-mail: ckarkos@hotmail.com; McMahon, Greg [Leicester Royal Infirmary, Department of Vascular and Endovascular Surgery (United Kingdom); Fishwick, Guy [Leicester Royal Infirmary, Department of Radiology (United Kingdom); Lambert, Kelly; Bagga, Ajay; McCarthy, Mark J. [Leicester Royal Infirmary, Department of Vascular and Endovascular Surgery (United Kingdom)

    2006-04-15T23:59:59.000Z

    Abdominal aortic aneurysm (AAA) repair in the presence of a kidney transplant can be extremely challenging, as it carries significant risks of renal ischemia. Endovascular repair is an attractive option, as it can be performed with little or no impairment of renal arterial flow. We describe the endovascular management of a recurrent AAA in a patient with a functioning renal transplant using a custom-made aorto-uni-iliac device. We discuss the planning and the potential problems of the technique.

  20. Laser engineered net shaping (LENS) for the repair and modification of NWC metal components.

    SciTech Connect (OSTI)

    Atwood, Clinton J.; Smugeresky, John E. (Sandia National Labs, Livermore,CA); Gill, David Dennis

    2006-11-01T23:59:59.000Z

    Laser Engineered Net Shaping{trademark} (LENS{reg_sign}) is a layer additive manufacturing process that creates fully dense metal components using a laser, metal powder, and a computer solid model. This process has previously been utilized in research settings to create metal components and new material alloys. The ''Qualification of LENS for the Repair and Modification of Metal NWC Components'' project team has completed a Technology Investment project to investigate the use of LENS for repair of high rigor components. The team submitted components from four NWC sites for repair or modification using the LENS process. These components were then evaluated for their compatibility to high rigor weapons applications. The repairs included hole filling, replacement of weld lips, addition of step joints, and repair of surface flaws and gouges. The parts were evaluated for mechanical properties, corrosion resistance, weldability, and hydrogen compatibility. This document is a record of the LENS processing of each of these component types and includes process parameters, build strategies, and lessons learned. Through this project, the LENS process was shown to successfully repair or modify metal NWC components.

  1. Remote Welding, NDE and Repair of DOE Standardized Canisters

    SciTech Connect (OSTI)

    Eric Larsen; Art Watkins; Timothy R. McJunkin; Dave Pace; Rodney Bitsoi

    2006-05-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) created the National Spent Nuclear Fuel Program (NSNFP) to manage DOE’s spent nuclear fuel (SNF). One of the NSNFP’s tasks is to prepare spent nuclear fuel for storage, transportation, and disposal at the national repository. As part of this effort, the NSNFP developed a standardized canister for interim storage and transportation of SNF. These canisters will be built and sealed to American Society of Mechanical Engineers (ASME) Section III, Division 3 requirements. Packaging SNF usually is a three-step process: canister loading, closure welding, and closure weld verification. After loading SNF into the canisters, the canisters must be seal welded and the welds verified using a combination of visual, surface eddy current, and ultrasonic inspection or examination techniques. If unacceptable defects in the weld are detected, the defective sections of weld must be removed, re-welded, and re-inspected. Due to the high contamination and/or radiation fields involved with this process, all of these functions must be performed remotely in a hot cell. The prototype apparatus to perform these functions is a floor-mounted carousel that encircles the loaded canister; three stations perform the functions of welding, inspecting, and repairing the seal welds. A welding operator monitors and controls these functions remotely via a workstation located outside the hot cell. The discussion describes the hardware and software that have been developed and the results of testing that has been done to date.

  2. In situ repair of a failed compression fitting

    DOE Patents [OSTI]

    Wolbert, R.R.; Jandrasits, W.G.

    1985-08-05T23:59:59.000Z

    A method and apparatus for the in situ repair of a failed compression fitting is provided. Initially, a portion of a guide tube is inserted coaxially in the bore of the compression fitting and locked therein. A close fit dethreading device is then coaxially mounted on the guide tube to cut the threads from the fitting. Thereafter, the dethreading device and guide tube are removed and a new fitting is inserted onto the dethreaded fitting with the body of the new fitting overlaying the dethreaded portion. Finally, the main body of the new fitting is welded to the main body of the old fitting whereby a new threaded portion of the replacement fitting is precisely coaxial with the old threaded portion. If needed, a bushing is located on the dethreaded portion which is sized to fit snugly between the dethreaded portion and the new fitting. Preferably, the dethreading device includes a cutting tool which is moved incrementally in a radial direction whereby the threads are cut from the threaded portion of the failed fitting in increments.

  3. In situ repair of a failed compression fitting

    DOE Patents [OSTI]

    Wolbert, Ronald R. (McKees Rocks, PA); Jandrasits, Walter G. (Pittsburgh, PA)

    1986-01-01T23:59:59.000Z

    A method and apparatus for the in situ repair of a failed compression fitg is provided. Initially, a portion of a guide tube is inserted coaxially in the bore of the compression fitting and locked therein. A close fit dethreading device is then coaxially mounted on the guide tube to cut the threads from the fitting. Thereafter, the dethreading device and guide tube are removed and a new fitting is inserted onto the dethreaded fitting with the body of the new fitting overlaying the dethreaded portion. Finally, the main body of the new fitting is welded to the main body of the old fitting whereby a new threaded portion of the replacement fitting is precisely coaxial with the old threaded portion. If needed, a bushing is located on the dethreaded portion which is sized to fit snugly between the dethreaded portion and the new fitting. Preferably, the dethreading device includes a cutting tool which is moved incrementally in a radial direction whereby the threads are cut from the threaded portion of the failed fitting in increments.

  4. Monitoring systems for predictive maintenance of steam turbines

    SciTech Connect (OSTI)

    Santiago, A.A.; Poujol-Galvan, F.C.; Kubiak, J.A.; Rivera-Grijalva, J.J.; Lopez, P.J. [Inst. de Investigaciones Electricas, Cuernavaca (Mexico)

    1994-12-31T23:59:59.000Z

    This paper describes two PC based computer systems that have been developed, constructed and installed in a power plant for predictive maintenance. The first system, called SIMPER, is operating on-line, collecting operational parameters such as: vibration, rotor thermal stresses, efficiency, pressures, temperatures and water level in the boiler drum from four 300 MW units. SIMPER is embedded in a network of eight nodes under the QNX operating system, and the data acquisition system has sixty four input channels. SICAD, the second system, is a dedicated computerized vibration acquisition and analysis system. The system is embedded in a 386 personal computer, and has eight input channels; each channel has its own programmable digital tracking filter. SICAD can record the vibration waveform, and the synchronous or subsynchronous vectors; the graphic interface displays in real time the polar diagram, the spectrum and waveform of the vibration signature that is being collected. SICAD can be used for balancing a multi rotor system applying the modal balancing concept.

  5. Functions of the cask maintenance facility: A white paper

    SciTech Connect (OSTI)

    Not Available

    1987-07-21T23:59:59.000Z

    The shipping cask systems are the mobile components of the transportation system, designed to safely transport spent nuclear fuel between different facilities under both normal and accident conditions. The cask system will consist of the heavily shielded cask, the cask transport vehicle (truck trailer or railcar), and any associated ancillary equipment (covers, impact limiters, lifting devices, etc.). The cask and certain parts of the cask system must be operated within the limits imposed by a certificate of compliance (COC) granted by the Nuclear Regulatory Commission (NRC). Each cask system must transport spent fuel safely during the life of the system. To maintain the operational effectiveness and safety of the cask systems, a cask maintenance facility (CMF) will be included as an integral part of the transportation system. The planning activity of the transportation system and the design effort of the CMF require that the functions to be performed by the CMF be explicitly defined. The purpose of this paper is to (1) define the potential transportation system functions to be performed at the CMF; (2) examine the impact of this functional definition on the overall transportation system; (3) identify any unresolved issues concerning the interaction of the CMF with other elements of the transportation system; and (4) make recommendations to resolve any unresolved issues so that decisions can be made early in the transportation system planning process.

  6. Motor Pool Department The Motor Pool Department is responsible for the maintenance of over 550 Georgia Tech state

    E-Print Network [OSTI]

    value of $3,000 or more. · Perform preventive maintenance (PM) on vehicles, LSVs, golf cartsMotor Pool Department The Motor Pool Department is responsible for the maintenance of over 550

  7. Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports

    SciTech Connect (OSTI)

    Fresco, A.; Subudhi, M.; Gunther, W.; Grove, E.; Taylor, J. [Brookhaven National Lab., Upton, NY (United States)

    1993-12-01T23:59:59.000Z

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.

  8. Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems

    E-Print Network [OSTI]

    1996-01-01T23:59:59.000Z

    Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems

  9. INTERNAL REPAIR OF GAS PIPLINES SURVEY OF OPERATOR EXPERIENCE AND INDUSTRY NEEDS REPORT

    SciTech Connect (OSTI)

    Ian D. Harris

    2003-09-01T23:59:59.000Z

    A repair method that can be applied from the inside of a gas transmission pipeline (i.e., a trenchless repair) is an attractive alternative to conventional repair methods since the need to excavate the pipeline is precluded. This is particularly true for pipelines in environmentally sensitive and highly populated areas. The objectives of the project are to evaluate, develop, demonstrate, and validate internal repair methods for pipelines; develop a functional specification for an internal pipeline repair system; and prepare a recommended practice for internal repair of pipelines. The purpose of this survey is to better understand the needs and performance requirements of the natural gas transmission industry regarding internal repair. A total of fifty-six surveys were sent to pipeline operators. A total of twenty completed surveys were returned, representing a 36% response rate, which is considered very good given the fact that tailored surveys are known in the marketing industry to seldom attract more than a 10% response rate. The twenty survey responses produced the following principal conclusions: (1) Use of internal weld repair is most attractive for river crossings, under other bodies of water (e.g., lakes and swamps) in difficult soil conditions, under highways, under congested intersections, and under railway crossings. All these areas tend to be very difficult and very costly if, and where, conventional excavated repairs may be currently used. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling (HDD) when a new bore must be created to solve a leak or other problem in a water/river crossing. (3) The typical travel distances required can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). In concept, these groups require pig-based systems; despooled umbilical systems could be considered for the first two groups. For the last group a self-propelled system with an onboard self-contained power and welding system is required. (4) Pipe size range requirements range from 50.8 mm (2 in.) through 1,219.2 mm (48 in.) in diameter. The most common size range for 80% to 90% of operators surveyed is 508 mm to 762 mm (20 in. to 30 in.) diameter, with 95% using 558.8 mm (22 in.) diameter pipe.

  10. Development of bonded composite doublers for the repair of oil recovery equipment.

    SciTech Connect (OSTI)

    Roach, David W.; Rackow, Kirk A.

    2005-06-01T23:59:59.000Z

    An unavoidable by-product of a metallic structure's use is the appearance of crack and corrosion flaws. Economic barriers to the replacement of these structures have created an aging infrastructure and placed even greater demands on efficient and safe repair methods. In the past decade, an advanced composite repair technology has made great strides in commercial aviation use. Extensive testing and analysis, through joint programs between the Sandia Labs FAA Airworthiness Assurance Center and the aviation industry, have proven that composite materials can be used to repair damaged aluminum structure. Successful pilot programs have produced flight performance history to establish the durability of bonded composite patches as a permanent repair on commercial aircraft structures. With this foundation in place, this effort is adapting bonded composite repair technology to civil structures. The use of bonded composite doublers has the potential to correct the difficulties associated with current repair techniques and the ability to be applied where there are no rehabilitation options. It promises to be cost-effective with minimal disruption to the users of the structure. This report concludes a study into the application of composite patches on thick steel structures typically used in mining operations. Extreme fatigue, temperature, erosive, and corrosive environments induce an array of equipment damage. The current weld repair techniques for these structures provide a fatigue life that is inferior to that of the original plate. Subsequent cracking must be revisited on a regular basis. The use of composite doublers, which do not have brittle fracture problems such as those inherent in welds, can help extend the structure's fatigue life and reduce the equipment downtime. Two of the main issues for adapting aircraft composite repairs to civil applications are developing an installation technique for carbon steel and accommodating large repairs on extremely thick structures. This study developed and proved an optimum field installation process using specific mechanical and chemical surface preparation techniques coupled with unique, in-situ heating methods. In addition, a comprehensive performance assessment of composite doubler repairs was completed to establish the viability of this technology for large, steel structures. The factors influencing the durability of composite patches in severe field environments were evaluated along with related laminate design issues.

  11. Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freight pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedes

    E-Print Network [OSTI]

    and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operat and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operations pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestrian

  12. ServicePac Maintenance Service Agreement NOTICE: PLEASE CAREFULLY READ THE FOLLOWING TERMS UNDER WHICH IBM WILL

    E-Print Network [OSTI]

    , engineering change activity, preventive maintenance, microcode/firmware activity, or features and partsServicePac ServicePac Maintenance Service Agreement NOTICE: PLEASE CAREFULLY READ THE FOLLOWING TERMS UNDER WHICH IBM WILL PROVIDE SERVICEPAC MAINTENANCE SERVICE TO YOU. IBM WILL PROVIDE THIS SERVICE

  13. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, VOL. 17, NO. 3, AUGUST 2004 345 Optimal Preventive Maintenance Scheduling in

    E-Print Network [OSTI]

    Fernandez, Emmanuel

    Preventive Maintenance Scheduling in Semiconductor Manufacturing Xiaodong Yao, Member, IEEE, Emmanuel), preventive maintenance (PM), scheduling, time-window policies. I. INTRODUCTION THE reliability of equipment calibration and preventive maintenance (PM). A good PM plan can increase equipment availability by trading off

  14. An Algorithm to Convert Wafer to Calendar-Based Preventive Maintenance Schedules for Semiconductor Manufacturing Systems1

    E-Print Network [OSTI]

    Fernandez, Emmanuel

    An Algorithm to Convert Wafer to Calendar-Based Preventive Maintenance Schedules for Semiconductor}@ececs.uc.edu Abstract-- The work presented here is related to the area of Optimal Preventive Maintenance (PM) Scheduling. Preventive Maintenance (PM) is a standard practice followed to increase reliability and availability

  15. Modeling the effects of maintenance on the degradation of a water-feeding turbo-pump of nuclear power plant

    E-Print Network [OSTI]

    Boyer, Edmond

    of the components, which derives from the particular `life' (failures, shocks, preventive maintenance actionsModeling the effects of maintenance on the degradation of a water-feeding turbo-pump of nuclear Abstract: This work addresses the modeling of the effects of maintenance on the degradation of an electric

  16. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, VOL. 23, NO. 3, AUGUST 2010 477 Optimal Preventive Maintenance Scheduling in

    E-Print Network [OSTI]

    Fernandez, Emmanuel

    Preventive Maintenance Scheduling in Semiconductor Manufacturing Systems: Software Tool and Simulation Case of a preventive maintenance optimization software tool (PMOST), based on algorithms for the optimal scheduling of the PM optimization algorithms utilized by PMOST. Index Terms--Optimal preventive maintenance (PM

  17. Optimal Highway Maintenance Policies under Uncertainty Bruno Castanier, Ph.D., Ecole des Mines de Nantes / IRCCyN

    E-Print Network [OSTI]

    Boyer, Edmond

    will extend the lifecycle of the road by performing preventive, conditioned-based maintenance to slow down the growth of cracks. Classical preventive maintenance policies usually shorten the lifecycle by forcingOptimal Highway Maintenance Policies under Uncertainty Bruno Castanier, Ph.D., Ecole des Mines de

  18. 46 September 2011Vol. 23 No. 3Engineering Management Journal A Budget-SensitiveApproach to Scheduling Maintenance

    E-Print Network [OSTI]

    Gosavi, Abhijit

    in significantly higher costs. It has been empirically shown that preventive maintenance can reduce the frequency the need to reduce lost production costs due to equipment failures with preventive maintenance costs. Managers do this by developing preventative maintenance schedules. Most statistical models in reliability

  19. Computer-aided acquisition and logistics support (CALS): Concept of Operations for Depot Maintenance

    SciTech Connect (OSTI)

    Bourgeois, N.C.; Greer, D.K.

    1993-04-01T23:59:59.000Z

    This CALS Concept of Operations for Depot Maintenance provides the foundation strategy and the near term tactical plan for CALS implementation in the depot maintenance environment. The user requirements enumerated and the overarching architecture outlined serve as the primary framework for implementation planning. The seamless integration of depot maintenance business processes and supporting information systems with the emerging global CALS environment will be critical to the efficient realization of depot user's information requirements, and as, such will be a fundamental theme in depot implementations.

  20. Site transition framework for long-term surveillance and maintenance

    SciTech Connect (OSTI)

    none,

    2014-04-01T23:59:59.000Z

    This document provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTSM) responsibilities. It is a tool to help facilitate a smooth transition from remediation to LTSM, providing a systematic process for affected parties to utilize in analyzing the baseline to understand and manage the actions from EM mission completion through a site’s transition into LTSM. The framework is not meant to provide an exhaustive list of the specific requirement and information that are needed. Sites will have unique considerations that may not be adequately addressed by this tool, and it is anticipated that a team comprised of the transferring and receiving organization will use judgment in utilizing this augmenting with other DOE guidance. However the framework should be followed to the extent possible at each site; and adapted to accommodate unique site-specific requirements, needs, and documents. Since the objective of the tool is facilitate better understanding of the conditions of the site and the actions required for transfer, the transition team utilizing the checklist is expected to consult with management of both the receiving and transferring organization to verify that major concerns are addressed. Ideally, this framework should be used as early in the remediation process as possible. Subsequent applications of the Site Transition Framework (STF) to the site should be conducted periodically and used to verify that all appropriate steps have been or will be taken to close-out the site and that actions by both organization are identified to transfer the site to LTSM. The requirements are provided herein.