Powered by Deep Web Technologies
Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Commencement Activities & Facility Maintenance Closures Updated Monday 4/29  

E-Print Network [OSTI]

· Fitness Center & Weight Room equipment cleaning, preventive maintenance, and layout changes #12;Commencement Activities & Facility Maintenance Closures Updated Monday 4/29 Spring Semester Normal Maintenance projects. · The Rec Center will be closed Monday 5/20 ­ Sunday 6/9. · The Rec Center reopens

von der Heydt, Rüdiger

2

EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING  

SciTech Connect (OSTI)

The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

Harris, S.; Gross, R.; Mitchell, E.

2011-01-18T23:59:59.000Z

3

Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500II Field Emission SEM with EDAX (For3WebinarUpdate on

4

SearchHistoryShopper Last Updated 10/23/2013 lks  

E-Print Network [OSTI]

invoices. · View the status of documents. · Search by Requester name using advanced search. History Search.......................................................................................................................................11 Advanced search.........................................................................................................................................................................12 Advanced search

Shull, Kenneth R.

5

SearchHistoryRequester Last Updated 10/24/2013 lks  

E-Print Network [OSTI]

of documents. · Search by Shopper name using advanced search. History Search · Search for documents.......................................................................................................................................11 Advanced search............................................................................................................................................................................12 Advanced search

Shull, Kenneth R.

6

Updated: 05/22/2014 FALL 2014 HISTORY AND LITERATURE 90 COURSES  

E-Print Network [OSTI]

., 1­3. The Industrial Revolution transformed social class and caused urban squalor, deep poverty and Literature concentrators if space is limited. *History and Literature 90av. Revolution and Reform in Britain about modern understandings of class inequality, revolution, and reform. *History and Literature 90ay

7

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr FlickrGuidedCH2MLLC High-Rate,HighlightsHistoricalHistory History A

8

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr FlickrGuidedCH2MLLC High-Rate,HighlightsHistoricalHistory History

9

History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area.Portal Solar PhotovoltaicCenterCenter forHistory

10

Maintenance Types  

Broader source: Energy.gov [DOE]

Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the...

11

Reactive Maintenance  

Broader source: Energy.gov [DOE]

Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities.

12

Inspection & Maintenance  

E-Print Network [OSTI]

vehicles they own or control: 1. Preventative maintenance/safety inspections at least every 3 to 6 months provides a Preventive Maintenance Check List for guidance and scheduling. 2. If a vehicle is under warranty, Fleet Services will ensure the vehicle has at least the normal preventative, scheduled maintenance

13

Laboratory services series: a programmed maintenance system  

SciTech Connect (OSTI)

The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

Tuxbury, D.C.; Srite, B.E.

1980-01-01T23:59:59.000Z

14

Predictive Maintenance  

Broader source: Energy.gov [DOE]

Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration.

15

Preventive Maintenance  

Broader source: Energy.gov [DOE]

Preventive maintenance aims to sustain and/or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time.

16

Reliability-Centered Maintenance  

Broader source: Energy.gov [DOE]

Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

17

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

18

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

19

Home Maintenance Manual.  

E-Print Network [OSTI]

they become serious. The accompanying home maintenance plan is one way of setting up a regular inspection program. The checklist suggests maintenance and the best time to inspect. Revise or add to this checklist to meet your needs. HOME MAINTENANCE...

Anonymous,

1985-01-01T23:59:59.000Z

20

Predictive Maintenance Technologies  

Broader source: Energy.gov [DOE]

Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs.

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Home Energy Score Program: Update and Overview for Potential...  

Energy Savers [EERE]

Home Energy Score Update Webinar Slides Better Buildings Neighborhood Program Home Accomplishments History Better Buildings Partners Stories Interviews Videos Contact Us...

22

Computerized Maintenance Management Systems  

Broader source: Energy.gov [DOE]

Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

23

Optimizing Preventive Maintenance Models  

E-Print Network [OSTI]

Optimizing Preventive Maintenance Models. Michael Bartholomew-Biggs. School of Physics Astronomy and Mathematics, University of Hertfordshire.

24

URESC Update  

Broader source: Energy.gov [DOE]

Presentation covers the URESC Update for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

25

Designing a scrubber for maintenance  

SciTech Connect (OSTI)

Under Round 4 of the U.S. Department of Energy`s (DOE) Clean Coal Technology program, New York State Electric & Gas Corporation (NYSEG), in partnership with Saarberg-Holter-Umwelttechnik (SHU), Consolidation Coal Company and Stebbins Engineering and Manufacturing Company, has retrofitted a formic acid enhanced forced oxidation wet limestone scrubber on Units I and 2 at the Milliken Steam Electric Station. Units I and 2 are 1950s vintage Combustion Engineering tangentially fired pulverized coal units, which are rated at nominal 150 MW each and operate in balanced draft mode. The Flue Gas Desulfurization (FGD) system for Unit 2 was placed into operation in January 1995 and the Unit I system in June 1995. The project incorporates several unique aspects: low pH operation; a ceramic tile-lined cocurrent/countercurrent, split module absorber; a wet stack supported on the roof of the FGD building; and closed loop, zero liquid discharge operation that produces commercial grade gypsum and calcium chloride brine. The project objectives include 98% SO{sub 2} removal efficiency while burning high sulfur coal, the production of marketable byproducts to minimize solid waste disposal, zero wastewater discharge, space-saving design, and minimization of maintenance requirements of a wet scrubber. The paper provides a brief overview of the project scrubber design relating to maintenance considerations. A discussion of the early results of the maintenance history is also provided. Repair techniques that have been developed and tested for ceramic tile lined modules are included. 1 fig.

Mahlmeister, M.E.; Baron, E.S. [New York State Electric and Gas Corp., Binghamton, NY (United States); Watts, J. [USDOE Pittsburgh Energy Technology Center, PA (United States)

1996-12-01T23:59:59.000Z

26

Curriculum Vitae (updated Feb-2010)  

E-Print Network [OSTI]

1 Curriculum Vitae (updated Feb-2010) General Name: Song Xi CHEN Current Employment: Professor Department of Statistics Iowa State University Mail Address: Department of Statistics Iowa State University: http://www.public.iastate.edu/~songchen/ Academic History Ph.D. in Statistics, 1993, Australian

Chen, Song Xi

27

Centralized maintenance procedures  

SciTech Connect (OSTI)

In 1989, shortly after Westinghouse Hanford Company (WHC) assumed maintenance responsibilities for the Hanford site, a Department of Energy (DOE) maintenance audit found that field (working level) maintenance procedures and procedure practices of the facilities scattered across Hanford`s 560 square miles varied as greatly as the locations of those facilities. In some of the audited facilities there were few or no procedures; in others, procedures conflicted with or were redundant to procedures at other facilities. This document presents current efforts to centralize maintenance procedures.

Barber, J.R.

1994-02-01T23:59:59.000Z

28

HVAC Maintenance and Technologies  

Broader source: Energy.gov [DOE]

Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

29

Updated 1-12 Thomas L. Frankfurt  

E-Print Network [OSTI]

Executive Officers and the Director of the Naval Nuclear Propulsion Program. From 2004 to 2006, he in the areas of government contract law, fiscal law, civilian personnel law, ethics, FOIA/Privacy Act, #12;Updated 1-12 environmental law, and litigation relating to the procurement and maintenance of the Navy

30

Hopper Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr FlickrGuidedCH2MLLC HistoryVeterans | Updates and Status Current

31

Maintenance strategies to improve sootblower availability  

SciTech Connect (OSTI)

Sootblowers are electromechanical devices used for removal of ash and slag deposits from boiler tube surfaces. By directing steam, air, or water cleaning medium through a nozzle to remove deposits from boiler tubes, boilers are kept on-line for longer periods of time reducing the need for outages to clean the boiler by mechanical means. Fuel must be burned efficiently to minimize stagging and fouling of the heat transfer surfaces. Tuning the boiler to maximize combustion efficiency should not be limited to optimizing fuel conditions, air-fuel ratios, firing rates, excess air, and over-fire air, but should also include the use of sootblowers. The goal is to know when to clean, and if the cleaning cycle has effectively removed the deposit and increased heat transfer. Today, boiler cleaning technology not only focuses on the impact of the sootblowing system on overall boiler performance, but it also focuses on design improvements that impact an individual sootblower`s performance. Proper sootblower maintenance is an integral part of making existing designs and new designs work. Existing computer technologies provide a viable means of documenting and trending sootblower performance data and maintenance history. The personal computer and the availability of spreadsheet and database software make the task of quantifying sootblower performance data and maintenance history easier to achieve. The difficult task is gathering the proper data to make decisions about sootblowing operations and maintenance. The balance of this paper will discuss typical maintenance practices, and improvements that can be achieved by documenting sootblowing system inspections and maintenance activity using a personal computer database.

Walther, J.M.; Whitehead, B.K.

1996-07-01T23:59:59.000Z

32

Operations and Maintenance Program Structure  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

33

CRAD, Maintenance Assessment Plan  

Broader source: Energy.gov [DOE]

An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations.

34

Associate Vice Chancellor Maintenance  

E-Print Network [OSTI]

Engineering Capital Planning & Design Carpentry Shop Electrical Shop Plumbing Shop HVAC Shop Housing Shop Equipment & Vehicle Maintenance Warehouse Vehicle Pool Shuttle Post Office Parking Services Contract Management Water Distribution Heat & Power Generation Heat Distribution Power Distribution December 2012

Hartman, Chris

35

Seasonal Landscape Maintenance  

E-Print Network [OSTI]

Seasonal Landscape Maintenance Oklahoma State University, in compliance with Title VI and VII State University's Department of Horticulture and Landscape Architecture and Oklahoma Cooperative to dry between watering allows plants to develop stronger, deeper roots. However, some landscape plants

Balasundaram, Balabhaskar "Baski"

36

A formal ontology for industrial maintenance  

E-Print Network [OSTI]

strategies (preventive maintenance, predictive maintenance, corrective maintenance), to managing operators1 A formal ontology for industrial maintenance Authors: 1- Dr. Mohamed Hedi KARRAY, LGP The rapid advancement of information and communication technologies has resulted in a variety of maintenance

Boyer, Edmond

37

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)  

SciTech Connect (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

38

HISTORY GALLERY  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History Gallery Inside the Museum Exhibitions Norris Bradbury Museum Lobby Defense Gallery Research Gallery History Gallery TechLab Virtual Exhibits invisible utility element...

39

Hypothetical Temporal Reasoning with History (Extended Version)  

E-Print Network [OSTI]

a history--encoding based methodology developed by Chomicki for checking dynamic database integrityHypothetical Temporal Reasoning with History Encoding (Extended Version) Marcelo Arenas constraints into a situation­calculus based specification of database updates as proposed by Reiter. By doing

Bertossi, Leopoldo

40

Operations and maintenance philosophy  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

DUNCAN, G.P.

1999-10-28T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

CH Packaging Maintenance Manual  

SciTech Connect (OSTI)

This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests.

Washington TRU Solutions

2002-01-02T23:59:59.000Z

42

Winter Heating Fuels Update  

Gasoline and Diesel Fuel Update (EIA)

Heating Fuels Update For: Congressional Briefings October 20, 2014 | Washington, DC By U.S. Energy Information Administration Winter Heating Fuels Update October 20, 2014 |...

43

*Staff Member Last Update: 9/17/13 Art Education, Studio Foundations AEF  

E-Print Network [OSTI]

*Staff Member Last Update: 9/17/13 KEY: Art Education, Studio Foundations AEF Art History AH;Last Updated 9/17/13 COMPUTER COMMITTEE/ VISUAL RESOURCE CTR Committee Elects Chair Thom Houser, Chair Geha Nell Andrew Alex Murawski #12;Last Updated 9/17/13 PORTFOLIO REVIEW Appointed by Area Chairs Asen

Arnold, Jonathan

44

Proposed SOLCOST maintenance activities  

SciTech Connect (OSTI)

This document provides a short description of work that has been accomplished to date and work in progress. A discussion of the program status as it is currently configured follows and finally proposed work by Solar Environmental Engineering Company (SEEC) in its most recently signed contract with the Department of Energy (DOE) is given. Early statements are designed to give the reader a good background so that the suggested SOLCOST maintenance activities will be more easily understood.

none,

1980-01-01T23:59:59.000Z

45

Nitrous Oxide Systems Maintenance in Clinical Areas  

E-Print Network [OSTI]

. It specifically speaks to maintenance of nitrous oxide delivery systems, preventive maintenance for house. Arrange with Facilities for regular preventive maintenance and annual performance check of ventilation). b. Provides preventive maintenance on ventilation system as necessary. c. Coordinates annual

Jia, Songtao

46

Scheduling with Fixed Maintenance, Shared Resources and ...  

E-Print Network [OSTI]

Nov 17, 2014 ... maintenance constraints, blending and shared resources. ...... tegrated fixed time interval preventive maintenance and production for schedul-.

2015-02-07T23:59:59.000Z

47

Africa's Transport Infrastructure Mainstreaming Maintenance and...  

Open Energy Info (EERE)

Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management...

48

Genepool Quarterly Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky Learning Fun withGenepool Quarterly MaintenanceGenepool

49

Operations & Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOilOnlineandOperations and Maintenance

50

Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness  

SciTech Connect (OSTI)

This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

Vesely, W.E.; Rezos, J.T. [Science Applications International Corp., Dublin, OH (United States)

1995-09-01T23:59:59.000Z

51

Development of a maintenance program  

SciTech Connect (OSTI)

Bruce Nuclear Generating Station (NGS) A in Tiverton, Ontario, has been operating for 10 yr. One reason for its successful operating record is the development of an effective preventive maintenance program. Evaluation of the existing preventive program included a review of maintenance of selected key equipment over the life of the station. The review emphasized the need to improve the storage and sorting of maintenance information for trend and cost analysis, manpower planning, reliability, and radiation dose calculations.

Walker, I.

1987-01-01T23:59:59.000Z

52

WEB TMA implemented & maintenance management history Improved predictive maintenance tracking with vibration & infrared  

E-Print Network [OSTI]

& generator · Installed increased capacity refrigerant storage tank & pump down unit on #2 chiller · Completed

Zhang, Yuanlin

53

Landscape Maintenance Considerations for Homeowner  

E-Print Network [OSTI]

Landscape Maintenance Considerations for Homeowner Associations: Save Money, Be Safe, Look Good is getting their money's worth from the landscape maintenance company. Photo credit: Asset Landscaping! Kelly Murray Young Haley Paul #12;1. Consider landscape plants a long- term investment · Trees

Sanderson, Mike

54

Asphalt, Concrete, and Turf Maintenance and Preservation  

E-Print Network [OSTI]

preventive maintenance, pavement distress and identification, and best practices for the maintenance Consultant WSB and Associates, Inc. 763-287-7184 jstewart@wsbeng.com #12;2 Preventive Maintenance Preventive maintenance and minor rehab, and is often used to repair environmental damage. Preventive maintenance narrows

Minnesota, University of

55

Energy Star for Hospitals 2011 Update: Progression or Regression?  

E-Print Network [OSTI]

Energy Star for Hospitals 2011 Update: Progression or Regression? Brandon E. Travis1 1 Project Manager, SSRCx, 2995 Sidco Drive, Nashville, TN 37204, U.S.A. Email: btravis@ssr-inc.com Abstract: The Energy Star performance rating system...ENERGY STAR for Hospitals 2011 Update: Progression or Regression? Brandon E. Travis October 24, 2012 History of Energy Star Energy Star for Hospitals Critique & Conclusions Outline ? Benchmarks are important ? Energy efficiency void...

Travis, B.

2012-01-01T23:59:59.000Z

56

Cosmic Growth History and Expansion History  

E-Print Network [OSTI]

of the expansion history dark energy equation of state,and growth history constraints on the dark energy equationand growth history constraints on the dark energy equation

Linder, Eric V.

2009-01-01T23:59:59.000Z

57

Gearbox Reliability Collaborative Update: A Brief (Presentation)  

SciTech Connect (OSTI)

This presentation is an update on the Gearbox Reliability Collaborative (GRC) for the AWEA Wind Project Operations, Maintenance & Reliability Seminar. GRC accomplishments are: (1) Failure database software deployed - partners see business value for themselves and customers; (2) Designed, built, instrumented, and tested two gearboxes - (a) Generated unprecedented public domain test data from both field testing and dynamometer testing, (b) Different responses from 'identical' gearboxes, (c) Demonstrated importance of non-torque loading and modeling approach; and (3) Active collaborative, with wide industry support, leveraging DOE funding - Modeling round robin and Condition Monitoring round robin.

Sheng, S.; Keller, J.; McDade, M.

2012-01-01T23:59:59.000Z

58

Operations and Maintenance Program Measurement  

Broader source: Energy.gov [DOE]

Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a...

59

Maintenance Practices for LED Streetlights  

Broader source: Energy.gov [DOE]

This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

60

Maintenance FUSION IGNITION RESEARCH EXPERIMENT  

E-Print Network [OSTI]

Insulation Enclosure Remote Maintenance Module FUSION IGNITION RESEARCH EXPERIMENT SYSTEM describes the status of the configuration development and the integration of the major subsystem components vessel structural stiffness, this configuration makes use of the cooling jacket as nuclear shielding

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Categorical Exclusion for Maintenance Work  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Work along the Electrical District 5 to Saguaro segment (414 to 585) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal...

62

Operations and Maintenance Management Support  

Broader source: Energy.gov [DOE]

Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows...

63

Business Development - Predictive Maintenance Products  

E-Print Network [OSTI]

BUSINESS DEVELOPMENT - PREDICTIVE MAINTENANCE PRODUCTS Phillip Sceiczina, ifm efector, inc. In this time of global competitiveness, more companies are focusing on reducing manufacturing costs to increase profits. Energy costs can be a...

Sceiczina, P.

2005-01-01T23:59:59.000Z

64

Sustainable Operations & Maintenance Implementation Support  

E-Print Network [OSTI]

, and purchasing policy: Energy efficiency cannot exist without accountability and organizational support energy efficiency in buildings. Organizational innovation for energy conservation; Organizations face of energy efficiency. Meetings with facilities personnel, maintenance staff, building managers, building oc

65

Turfgrass: Maintenance Costs in Texas.  

E-Print Network [OSTI]

. These regions also have high water costs. The Gulf Coast, where water is a minor item, has an average expenditure only slightly greater than half that in West Texas. Average lawn sizes in these two regions are almost identical. Use of com- post, commercial.... Individuals with grasses other than bermuda and St. Augustine spend on the average about 53 percent TARLE 2. TOTALS OF VARIOUS HOME LAWN MAINTENANCE EXPENDITURES WITHIN REGIONS AND FOR THE STATE1 Number of Maintenance items Region households Commercial...

Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

1964-01-01T23:59:59.000Z

66

History Gallery  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr FlickrGuidedCH2MLLC High-Rate,HighlightsHistoricalHistoryHistory

67

Beam History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6 M. Babzien, I. Ben-Zvi, P. StudyBeam History PrintBeam History

68

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Update is prepared by the Electric Power Operations Team, Office of Electricity, Renewables and Uranium Statistics, U.S. Energy Information Administration (EIA), U.S....

69

Directives Quarterly Updates  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Listings of new Justification Memoranda and new or revised Directives that have been posted to the DOE Directives, Delegations, and Requirements Portal. Updated quarterly.

70

Plans, Updates, Regulatory Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2010 Target Action Level (TAL) Exceedance Report 2011 Updates on Permit Compliance March 7, 2013, NPDES Permit No. NM0030759 - Request for Extenstion to Submit Renewal Application...

71

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

See all Electricity Reports Electricity Monthly Update With Data for September 2014 | Release Date: Nov. 25, 2014 | Next Release Date: Dec. 23, 2014 Previous Issues Issue:...

72

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

See all Electricity Reports Electricity Monthly Update With Data for October 2014 | Release Date: Dec. 23, 2014 | Next Release Date: Jan. 26, 2015 Previous Issues Issue:...

73

Skye, Schell, Washington Update  

Broader source: Energy.gov (indexed) [DOE]

Updates in the Program 13 qualified ESCOs under GSA Schedule 84 * Four Small Business vendors Expanded ECMs to solar (PV) and related HVAC equipment ...

74

Navy Technology Evaluation Update  

Broader source: Energy.gov [DOE]

Presentation covers the Navy Technology Evaluation update at the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

75

Dynamic Scheduling of Maintenance Activities Under Uncertainties  

E-Print Network [OSTI]

of the required treatment. There are mainly two types of maintenance activities: the preventive maintenance, whoseDynamic Scheduling of Maintenance Activities Under Uncertainties Fran¸cois Marmier, Christophe in maintenance services field where the different practical knowledges or skills are their working tools. We

Paris-Sud XI, Université de

76

Chapter 6.14 PROPERTY MAINTENANCE  

E-Print Network [OSTI]

Chapter 6.14 PROPERTY MAINTENANCE Sections: 6.14.010 Findings. 6.14.020 Landscape Maintenance. 6 of landscaping and/or landscape maintenance on private property, including overgrown, dead, or decayed vegetation of the residents of the City of Riverside. (Ord. 6970 § 2, 2007) Section 6.14.020 Landscape maintenance. A

Lyubomirsky, Ilya

77

Operations and Maintenance Manual for Large Aperture Scanner System  

SciTech Connect (OSTI)

Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

Jones, Anthony M.; Hall, Thomas E.

2010-04-08T23:59:59.000Z

78

User's guide to the MESOI diffusion model and to the utility programs UPDATE and LOGRVU  

SciTech Connect (OSTI)

MESOI is an interactive, Lagrangian puff trajectory diffusion model. The model is documented separately (Ramsdell and Athey, 1981); this report is intended to provide MESOI users with the information needed to successfully conduct model simulations. The user is also provided with guidance in the use of the data file maintenance and review programs; UPDATE and LOGRVU. Complete examples are given for the operaton of all three programs and an appendix documents UPDATE and LOGRVU.

Athey, G.F.; Allwine, K.J.; Ramsdell, J.V.

1981-11-01T23:59:59.000Z

79

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration  

SciTech Connect (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

80

Electric Turbo Compounding Technology Update  

Broader source: Energy.gov (indexed) [DOE]

Turbo Compounding Technology Update Electric Turbo Compounding Technology Update 15 August, 2007 Carl Vuk 15 August, 2007 Carl Vuk Electric Turbo Compounding Highlights Electric...

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Opportune maintenance and predictive maintenance decision support douard Thomas, ric Levrat, Benoit Iung, Pierre Cocheteux  

E-Print Network [OSTI]

: When to perform a particular maintenance action? What components should benefit from a preventive maintenance action? Which components should first benefit from a preventive maintenance interventionOpportune maintenance and predictive maintenance decision support ?douard Thomas, ?ric Levrat

Paris-Sud XI, Université de

82

Airline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches  

E-Print Network [OSTI]

-based. The preventative alternative involves the transmission of maintenance data to maintenance personnel whenAirline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches Mike Dupuy, Dan Wesely, Cody Jenkins Abstract ­ Airline maintenance is a significant contributor

83

Iron production maintenance effectiveness system  

SciTech Connect (OSTI)

In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

Augstman, J.J. [Dofasco Inc., Hamilton, Ontario (Canada)

1996-12-31T23:59:59.000Z

84

Dynamic Maintenance of Service Orchestrations  

E-Print Network [OSTI]

-Rocquencourt, France Valérie Issarny INRIA Paris-Rocquencourt, France ABSTRACT Service-oriented architectures evolved/orchestration of services. One of the next challenges in this field is the maintenance of service-oriented architectures orchestrations. 1. INTRODUCTION Service Oriented Architecture (SOA) is an architectural style that emerged

Boyer, Edmond

85

Complexity in Big History  

E-Print Network [OSTI]

Spier, Fred. How Big History Works: Energy Flows and RiseSmil, Vaclav. Energy in World History. Boulder, CO: Westviewkg) Energy and complexity Spier: Complexity in Big History.

Spier, Fred

2011-01-01T23:59:59.000Z

86

Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM)  

Broader source: Energy.gov [DOE]

Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND...

87

ORISE: History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratory |CHEMPACK MappingHistory The Oak Ridge Institute for Science and

88

Beam History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6 M. Babzien, I. Ben-Zvi, P. StudyBeam History Print Beamline

89

Beam History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6 M. Babzien, I. Ben-Zvi, P. StudyBeam History Print

90

Invertible Program Restructurings for Continuing Modular Maintenance  

E-Print Network [OSTI]

Invertible Program Restructurings for Continuing Modular Maintenance Julien Cohen ASCOLA team (EMN in main- tenance with invertible program transformations. We illustrate this on the typical Expression problems with our approach. Keywords-modular maintenance; restructuring; invertible pro- gram

Paris-Sud XI, Université de

91

Effects of dairy intake on weight maintenance  

E-Print Network [OSTI]

, randomized trial. Weight loss was baseline to 3 months, weight maintenance was 4 to 9 months. Participants were maintained randomly assigned to low dairy ( 3 servings/d) diets for the maintenance phase. Three...

Zemel, Michael B.; Donnelly, Joseph E.; Smith, Bryan K.; Sullivan, Debra K.; Richards, Joanna; Morgan-Hanusa, Danielle; Mayo, Matthew S.; Sun, Xiaocun; Cook-Wiens, Galen; Bailey, Bruce W.; Van Walleghen, Emily L.; Washburn, Richard A.

2008-10-24T23:59:59.000Z

92

Mining Surveillance and Maintenance Dollars  

SciTech Connect (OSTI)

Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

MARTINEZ, R.

2000-02-01T23:59:59.000Z

93

Maintenance and Prevention: Formalization and Fixpoint Characterization  

E-Print Network [OSTI]

Maintenance and Prevention: Formalization and Fixpoint Characterization Munindar P. Singh Maintenance and prevention are important concepts in the science of intel­ ligent systems, yet serious research attention. Maintenance and prevention are duals of each other, but cannot be reduced

94

ROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE  

E-Print Network [OSTI]

activities: the preventive maintenance, whose activities can be long term planned, and the correctiveROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE François MARMIER , Christophe VARNIER. Especially in the field of maintenance services where the different practical knowledge or skills

Paris-Sud XI, Université de

95

Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing  

E-Print Network [OSTI]

1 Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing Xiaodong Yao, Emmanuel on Control Applications in 2001. #12;2 Abstract Preventive Maintenance (PM) scheduling is a very challenging schedule with that of a baseline reference schedule are also presented. Index Terms preventive maintenance

Marcus, Steven I.

96

Prognostics for the Maintenance of Distributed Systems  

E-Print Network [OSTI]

but also higher level function prognosis. I. INTRODUCTION In the classical case, preventive maintenance of preventive maintenance for complex systems. In this sense, a distributed system can be split down into a setPrognostics for the Maintenance of Distributed Systems Pauline Ribot, Yannick Pencol´e and Michel

Pencolé, Yannick

97

STANDARD OPERATING PROCEDURES Annual Site Maintenance  

E-Print Network [OSTI]

IMPROVE STANDARD OPERATING PROCEDURES SOP 226 Annual Site Maintenance Date Last Modified Modified This standard operating procedure (SOP) describes the procedures for annual maintenance of equipment Sampler Operation Manual #12;SOP 226: Annual Site Maintenance 3 1.0 PURPOSE AND APPLICABILITY

Fischer, Emily V.

98

Preventative Maintenance (PM) Policy Outline the policy regarding preventative vehicle maintenance on University of Michigan (U-  

E-Print Network [OSTI]

Preventative Maintenance (PM) Policy Objective Outline the policy regarding preventative vehicle maintenance on University of Michigan (U- M) vehicles. Policy 1. All maintenance performed on U-M vehicles their own campus maintenance facility to repair their fleet vehicles. 2. To ensure proper stewardship of U

Kirschner, Denise

99

Vehicle Maintenance Policy Outline the policy regarding vehicle maintenance at University of Michigan (U-M).  

E-Print Network [OSTI]

Vehicle Maintenance Policy Objective Outline the policy regarding vehicle maintenance at University of Michigan (U-M). Policy 1. All maintenance performed on U-M vehicles must be coordinated through Garage to repair their fleet vehicles. 2. U-M vehicles leased through Fleet Services include routine maintenance

Kirschner, Denise

100

An Evaluation of the Effects of Fixed-Time Schedules on Response Maintenance  

E-Print Network [OSTI]

it is currently unclear as to what mechanisms are responsible for this maintenance. The purposes of the current study were to (a) replicate previous research showing that responding will maintain under fixed-time (FT) schedules after a history of response...

Payne, Steven Wade

2013-05-31T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao  

E-Print Network [OSTI]

Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao SAS Institute Inc. Cary preventive maintenance (PM) and production policies for an unreliable production-inventory system in which to establish some additional structural properties. Keywords: optimal preventive maintenance, joint maintenance

Marcus, Steven I.

102

Updates - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Updates by Diane Johnson Email Alerts Subscribe to automatic e-mail notification about updates to the portal. Email Alerts...

103

Academy Member Annual Update Report 1Academy Member Update Report  

E-Print Network [OSTI]

Academy Member Annual Update Report 1Academy Member Update Report The annual update report is an important activity associated with active membership in the Academy. These reports are due annually questions. A separate document includes the required report format and directions. Please email omerad

104

A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling Problem in the Robustness  

E-Print Network [OSTI]

A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling production and Preventive Maintenance (PM) scheduling problem in the robustness framework. The contributions equipment reliability and performance loss under disruption Key words: Production, Preventive maintenance

Paris-Sud XI, Université de

105

Updated 08/10/2010 Complete the Education and Work Experience Template--Husky Hire 1 of 7 Applicants can create an electronic application by filling in the applicable education and work experience  

E-Print Network [OSTI]

Updated 08/10/2010 Complete the Education and Work Experience Template--Husky Hire 1 of 7 to build the application. Complete the Education and Work Experience Template #12;Updated 08 Click (repeat steps 4-5 to fill in previous work history. #12;Updated 08/10/2010 Complete the Education

Holsinger, Kent

106

Program Review Updates and Briefings  

Broader source: Energy.gov [DOE]

You can learn more about the U.S. Department of Energy (DOE) Geothermal Technologies Program by reading its program review updates and program briefings. These updates and briefings feature...

107

New Book Updates INL's History, Documents a Decade of Transformation |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen OwnedofDepartment ofJaredOak Ridge’s EMGeothermalEnergy NEWSDepartment

108

October Live Auction, NPR-3 Sale Update & Our History.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 Technical Conference Oct. 25-27, 2011

109

No maintenance -- no energy efficiency  

SciTech Connect (OSTI)

Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

1994-12-01T23:59:59.000Z

110

CAC Update: HFBR and BGRR  

E-Print Network [OSTI]

rod blades and casks has been installed and tested #12;HFBR Update #12;HFBR Update Personnel have been on procedures for completing the work · Drills and dry-runs have been conducted to develop worker proficiency under normal and off-normal conditions #12;HFBR Update Transportation cask Certificates of Compliance

Homes, Christopher C.

111

Richmond Bay Campus: Project Update  

E-Print Network [OSTI]

Coordinate with City of Richmond South Shoreline Area planning #12;Richmond Bay Campus Vision A stateRichmond Bay Campus: Project Update Prepared for the Richmond City Council October 1, 2013 #12 and UCB City of Richmond Updates Summary Questions & Answers #12;LBNL Project Update #12;University

Lee, Jason R.

112

Information Updates: Position/Title  

E-Print Network [OSTI]

Information Updates: Name: Position/Title: Business Mailing Address: Home Mailing Address: Phone of nurse involvement and patient education. She is an active nurse leader that brings thoughtful discussion be a chapter update for upcoming future events and plans for the future. Don't miss this exciting update! Beta

Sheridan, Jennifer

113

Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3  

SciTech Connect (OSTI)

The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

Leigh, Richard J.

2012-09-01T23:59:59.000Z

114

Department of Literature and History of Ideas Stockholm University  

E-Print Network [OSTI]

in the Digital Age Maps have a long history of being connected to narrative: as sources of inspiration to digital technology, maps have acquired new properties: they are now easily updated, interactive projects in which, thanks to one or the other of these properties, maps take an active part in the process

115

Roadmap: Art History Bachelor of Arts [CA-BA-ARTH  

E-Print Network [OSTI]

Roadmap: Art History ­ Bachelor of Arts [CA-BA-ARTH] College of the Arts School of Art Catalog Year: 2013­2014 Page 1 of 2 | Last Updated: 30-Apr-13/JS This roadmap is a recommended semester Elective (upper division) 3 Minor Requirements or General Electives 9 See note 2 on page 2 #12;Roadmap

Sheridan, Scott

116

Roadmap: Art History Bachelor of Arts [CA-BA-ARTH  

E-Print Network [OSTI]

Roadmap: Art History ­ Bachelor of Arts [CA-BA-ARTH] College of the Arts School of Art Catalog Year: 2012­2013 Page 1 of 2 | Last Updated: 29-May-12/JS This roadmap is a recommended semester Elective (upper division) 3 Minor Requirements or General Electives 9 See note 2 on page 2 #12;Roadmap

Sheridan, Scott

117

Optimization Online - Optimizing Preventive Maintenance Models  

E-Print Network [OSTI]

Jun 29, 2004 ... Abstract: We deal with the problem of scheduling preventive maintenance (PM) by minimizing a performance function which reflects repair and...

Michael Bartholomew-Biggs

2004-06-29T23:59:59.000Z

118

BPAT Systems Maintenance - February 9, 2015  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 292015 BPAT's...

119

BPAT Systems Maintenance - December 12, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 12122014 BPAT's...

120

BPAT Systems Maintenance - November 5, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 1152014 BPAT's...

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

FAQS Reference Guide Facility Maintenance Management  

Broader source: Energy.gov [DOE]

This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

122

Scheduling with Fixed Maintenance, Shared Resources and ...  

E-Print Network [OSTI]

Nov 30, 2014 ... Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: a Mine Planning Case Study. Christina N Burt...

Christina N Burt

2014-11-30T23:59:59.000Z

123

WECC and Peak Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WECC and Peak Update Transmission B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-decisional. For Discussion Purposes Only. WECC and Peak Background In the...

124

RESEARCH UPDATE Ecology Division  

E-Print Network [OSTI]

1 RESEARCH UPDATE Ecology Division Biotype has changed its name to Ecotype! Following the re-organisation of Forest Research into five science Divisions and three Support Divisions, the former Woodland Ecology Branches to form the new Ecology Division. We decided to give the divisional newsletter a new name (and

125

Idaho National Laboratory History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Attractions and Events Area Geography Area History Area Links Driving Directions Idaho Falls Attractions and Events INL History INL Today Research Park Sagebrush Steppe...

126

Southeast Idaho History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Attractions and Events Area Geography Area History Area Links Driving Directions Idaho Falls Attractions and Events INL History INL Today Research Park Sagebrush Steppe...

127

Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker  

E-Print Network [OSTI]

is carried to understand the importance of model parameters in obtaining optimal maintenance strategies. The analysis covers the effect of inspection rate calculated for each stage and its impact on failure probability, inspection cost, maintenance cost...

Natti, Satish

2010-01-14T23:59:59.000Z

128

Section 6 -Facilities Usage and Maintenance A. Facilities Usage and Maintenance  

E-Print Network [OSTI]

Section 6 - Facilities Usage and Maintenance A. Facilities Usage and Maintenance 1 be held financially responsible. Financial responsibility extends to abandoned belongings, excessive is not permitted under any circumstances. Storage facilities are provided in most student housing units for storing

Pantaleone, Jim

129

Vehicle Maintenance Procedure Outline the procedure for vehicle maintenance at University of Michigan (U-M).  

E-Print Network [OSTI]

Vehicle Maintenance Procedure Objective Outline the procedure for vehicle maintenance at University of Michigan (U-M). Procedure 1. Your U-M vehicle has a mechanical and/or safety issue. 2. Contact Garage of the vehicle or if needed, have the vehicle towed to the maintenance facility. 4. If a loaner is needed while

Kirschner, Denise

130

Void Fraction Instrument operation and maintenance manual  

SciTech Connect (OSTI)

This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

1994-09-01T23:59:59.000Z

131

Software Testing and Maintenance 1 Regression Testing  

E-Print Network [OSTI]

1 Software Testing and Maintenance 1 Regression Testing Introduction Test Selection Test Minimization Test Prioritization Summary Software Testing and Maintenance 2 What is it? Regression testing refers to the portion of the test cycle in which a program is tested to ensure that changes do not affect

Lei, Jeff Yu

132

Functional Prognostic Architecture for the Maintenance of Complex Systems  

E-Print Network [OSTI]

their functions by new ones. In order to optimize the maintenance cost, it is necessary to perform preventive maintenance to prevent failure occur- rence. Preventive maintenance actions consist in replacing components the date of the next scheduled maintenance phase. In the classical case, preventive maintenance is only

Pencolé, Yannick

133

Diagnosis and prognosis for the maintenance of complex systems  

E-Print Network [OSTI]

--Diagnosis, prognosis, preventive maintenance, complex systems. I. INTRODUCTION Nowadays, system maintenance is a key to decrease the maintenance cost, it is necessary to perform preventive maintenance [3], [4], [5] which alsoDiagnosis and prognosis for the maintenance of complex systems Pauline Ribot1,2 , Yannick Pencol´e1

Pencolé, Yannick

134

Texas Electricity Update  

E-Print Network [OSTI]

Texas Electricity Update CATEE 2012 Galveston, Texas Brian Lloyd Executive Director Public Utility Commission of Texas October 10, 2012 1 2 Drought Summary May Reserve Margin Report 3 Demand Growth by Region 4 105? Normal... 917 Firm Load Forecast, MW 65,649 68,403 71,692 73,957 75,360 76,483 CATEE 2012 Questions? Brian H. Lloyd Executive Director Public Utility Commission of Texas 512-936-7040 14 ...

Lloyd, B.

2012-01-01T23:59:59.000Z

135

Next Update: November 2013  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia,(Million Barrels) Crude Oil Reserves in Nonproducing ReservoirsYear-Month WeekReserves (Billion Cubic Next Update:

136

Updated U.S. Geothermal Supply Characterization and Representation for Market Penetration Model Input  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Geothermal Technologies Program (GTP) tasked the National Renewable Energy Laboratory (NREL) with conducting the annual geothermal supply curve update. This report documents the approach taken to identify geothermal resources, determine the electrical producing potential of these resources, and estimate the levelized cost of electricity (LCOE), capital costs, and operating and maintenance costs from these geothermal resources at present and future timeframes under various GTP funding levels. Finally, this report discusses the resulting supply curve representation and how improvements can be made to future supply curve updates.

Augustine, C.

2011-10-01T23:59:59.000Z

137

Health & Safety Plan Last Updated  

E-Print Network [OSTI]

Health & Safety Plan Last Updated March 2008 1 #12;A. SCOPE AND RESPONSIBILITY....................................................................................................................................... 3 2. Safety and Health Policy...................................................................................................................... 3 4. Safety Coordinator

Anderson, Richard

138

Agricultural and Resource Economics Update  

E-Print Network [OSTI]

Analysis for Evaluating Biofuels. ARE Update 11(3) (2008):the RFS conventional biofuels mandate is severely harmingThe first is growth in biofuels demand. Notably, corn

2012-01-01T23:59:59.000Z

139

Agricultural and Resource Economics Update  

E-Print Network [OSTI]

Environmental Impact of Biofuels. ARE Update 15(2):9-11.and the Environmental Impact of Biofuels Gal Hochman, Deepakand the Environmental Impact of Biofuels Gal Hochman, Deepak

Lee, Hyunok; Sumner, Daniel A.; Martin, Philip; Hochman, Gal; Rajagopal, Deepak; Zilberman, David

2011-01-01T23:59:59.000Z

140

Progress Update: TRU Waste Shipping  

SciTech Connect (OSTI)

A progress update at the Savannah River Site. A continued effort on shipping TRU waste to WIPP in Carlsbad, New Mexico.

Cody, Tom

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Progress Update: TRU Waste Shipping  

ScienceCinema (OSTI)

A progress update at the Savannah River Site. A continued effort on shipping TRU waste to WIPP in Carlsbad, New Mexico.

Cody, Tom

2012-06-14T23:59:59.000Z

142

Optimization models for improving periodic maintenance schedules by utilizing opportunities  

E-Print Network [OSTI]

to this as preventive maintenance activities at an oppor- tunity. The original opportunistic replacement problemOptimization models for improving periodic maintenance schedules by utilizing opportunities Torgny of Technology Abstract We present mathematical models for finding optimal opportunistic maintenance schedules

Patriksson, Michael

143

Modelling maintenance for components under competing risk Helge Langseth  

E-Print Network [OSTI]

preventively maintained. The preventive maintenance (PM) is performed periodically with some period , but PMModelling maintenance for components under competing risk Helge Langseth Norwegian University the mathematical modelling of imperfect maintenance of a system under competing risk. The model we propose

Langseth, Helge

144

Condition-Based Maintenance via Simulation and a Targeted Bayesian  

E-Print Network [OSTI]

malfunctioning. Accordingly, it is essential to undertake an effective preventive maintenance (PM) policyCondition-Based Maintenance via Simulation and a Targeted Bayesian Network Metamodel Aviv Gruber, Israel ABSTRACT Condition-based maintenance (CBM) is increasingly applied to operational systems

Ben-Gal, Irad E.

145

Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO)  

E-Print Network [OSTI]

, Limited Commercial Landscape Maintenance, Ornamental & Turf, Private Ag, or General Standards CORE for Limited Commercial Landscape Maintenance (LCLM), you must attend all day to earn the 6 CEUs required. Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO) Training & Exams Date

Florida, University of

146

OIL & GAS HISTORY 1 History in California  

E-Print Network [OSTI]

OIL & GAS HISTORY 1 History in California 4 Superior figures refer to references at the end of the essay. OIL AND GAS PRODUCTION California oil was always a valued commodity. When the Spanish explorers landed in California in the 1500s, they found Indians gathering asphaltum (very thick oil) from natural

147

Iran in History Iran in History  

E-Print Network [OSTI]

1 Iran in History Iran in History by Bernard Lewis In attempting to attain some perspective on Iran. These events have been variously seen in Iran: by some as a blessing, the advent of the true faith, the end remarkable difference between what happened in Iran and what happened in all the other countries

Mohaghegh, Shahab

148

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

2001-06-01T23:59:59.000Z

149

Eagle Project Update Eagle P3 Project Update  

E-Print Network [OSTI]

) offers 11-minute travel time to Westminster #12;5 Eagle P3 Project Scope · Overall capital cost $2 for cost effective index · Allows RTD to spread the cost of the project over a longer time periodEagle Project Update Eagle P3 Project Update Rick Clarke Assistant General Manager, Capital

Bustamante, Fabián E.

150

1 POSTGRADUATE SCHOLARSHIPS UPDATE -July -August 2014 Postgraduate Scholarships Update  

E-Print Network [OSTI]

- August 2014 ADDRESSENQUIRIESAND YOURCOMPLETEDFORMTO: SCHOLARSHIPSMANAGER ScholarshipsOffice Victoria1 POSTGRADUATE SCHOLARSHIPS UPDATE - July - August 2014 Postgraduate Scholarships Update JulyUniversityofWellington POBox600 Wellington6140 NewZealand PHONE +64-4-4635113 EMAIL scholarships-office@vuw.ac.nz WEBSITE www.victoria

Frean, Marcus

151

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of...

152

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR...

153

FY 2014 Real Property Data Related to Operations and Maintenance...  

Office of Environmental Management (EM)

FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY2014DataRelatedtoOperatio...

154

Project Profile: Innovative Application of Maintenance-Free Phase...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Systems Project Profile: Innovative Application of Maintenance-Free Phase-Change Thermal...

155

Building America Residential Energy Efficiency Technical Update...  

Energy Savers [EERE]

Residential Energy Efficiency Technical Update Meeting: August 2011 Building America Residential Energy Efficiency Technical Update Meeting: August 2011 On this page, you may link...

156

Energy Storage Systems 2010 Update Conference Presentations ...  

Broader source: Energy.gov (indexed) [DOE]

by SNL's Ross Guttromson, are below. ESS 2010 Update Conference - NYSERDA-DOE Joint Energy Storage Initiative - Georgianne Huff, SNL.pdf ESS 2010 Update Conference - Testing...

157

Energy Storage Systems 2010 Update Conference Presentations ...  

Broader source: Energy.gov (indexed) [DOE]

and Peak Shifting - Steve Willard, PNM.pdf ESS 2010 Update Conference - Tehachapi Wind Energy Storage - Loic Gaillac, SCE.pdf ESS 2010 Update Conference - Flow Battery Solution...

158

Residential Energy Efficiency Technical Update Meeting: August...  

Broader source: Energy.gov (indexed) [DOE]

Technical Update Meeting: August 2011 Residential Energy Efficiency Technical Update Meeting: August 2011 On this page, you may link to the summary report and presentations for the...

159

A case model for predictive maintenance  

E-Print Network [OSTI]

This project is to respond to a need by Varian Semiconductor Equipment Associates, Inc. (VSEA) to help predict failure of ion implanters. Predictive maintenance would help to reduce the unscheduled downtime of ion implanters, ...

Li, Jiawei, M. Eng. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

160

Maintenance expo................... 3 Georgia visitors....................... 3  

E-Print Network [OSTI]

Inside Maintenance expo................... 3 Georgia visitors....................... 3 Fluid Power Center ................ 4 CTS services Web page .......... 4 A monthly report on transportation transformation of nation's transportation policy The results of a 13-month study led by David Kittelson

Minnesota, University of

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Risk impact of maintenance program changes  

E-Print Network [OSTI]

This study quantifies the change in one measure of plant risk, the frequency of loss of long-term decay heat removal, due to changes in maintenance at the James A. Fitzpatrick (JAF) plant. Quantification is accomplished ...

Credit, Kimberly A. (Kimberly April)

1992-01-01T23:59:59.000Z

162

Operations and Maintenance for Major Equipment Types  

Broader source: Energy.gov [DOE]

Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

163

Optimizing Installation, Operation, and Maintenance at Offshore...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

wind industries, and significant first-hand knowledge of offshore installation, operation and maintenance (IO&M) activities. The aim of the GL GH study was to enable project...

164

Significantly reduce maintenance time Documents&Mediabecomesthekey  

E-Print Network [OSTI]

Significantly reduce maintenance time Documents&Mediabecomesthekey contactforallmaintenanceneeds. MajorpartsarestoredbyDocuments& MediaattheMissionCenter.Thisreduces thetimeneededtoorderpartsandresultsin&Mediaoffersthecampus communityaconvenientandeconomicsolution foritscopiers,multifunctiondevicesandprinter needs. Print Management Program advantages Reduce

Mullins, Dyche

165

Janice Bryant Oral History  

E-Print Network [OSTI]

Oral history interview with Janice Bryant conducted by Lauren Helmer in Marion, Kansas, on December 29, 2010. In this interview, Janice Bryant, a former church secretary for Valley Methodist Church, discusses the history, organization, and programs...

Bryant, Janice; Helmer, Lauren

2010-12-29T23:59:59.000Z

166

National Women's History Month  

Broader source: Energy.gov [DOE]

During Women's History Month, we recall that the pioneering legacy of our grandmothers and great-grandmothers is revealed not only in our museums and history books, but also in the fierce...

167

Uganda: A Modern History  

E-Print Network [OSTI]

pages, hardcover,. $27.50. uganda; A Modern History. Jan J .contemporary history Qf Uganda. His work supplies us with aand integration of Uganda's economy into the World capita 1

Ssali, Ndugu Mike

1983-01-01T23:59:59.000Z

168

Carver Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6Energy,MUSEUM DISPLAYCareers TheEmail Announcements Updates and

169

Next Update: November 2013  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia,(Million Barrels) Crude Oil Reserves in Nonproducing ReservoirsYear-Month WeekReserves (Billion Cubic Next Update:Next

170

Next Update: November 2013  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia,(Million Barrels) Crude Oil Reserves in Nonproducing ReservoirsYear-Month WeekReserves (Billion Cubic Next Update:Next

171

Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption by sectorlongUpdates by Diane Johnson Email Alerts Subscribe to

172

Euclid Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4:Epitaxial Thin Film XRD EpitaxialProgrammingStatus Updates and

173

Genepool Updates and Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr Flickr Editor'sshort version) ThelongEmailStatus Updates and Status

174

Pressure maintenance in a volatile oil reservoir  

E-Print Network [OSTI]

PRESSURE MAINTENANCE IN A VOLATILE OIL RESERVOIR A Thesis BRUCE ALAN SCHUSTER Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May, 1989 Major... Subject: Petroleum Engineering PRESSURE MAINTENANCE IN A VOLATILE OIL RESERVOIR A Thesis BRUCE ALAN SCHUSTER Approved as to style and content by: S. A. Holditch (Chair of Committee) W. J. Lee (Member) R. R, Berg (Member) , Jz W. D. Von Gonten...

Schuster, Bruce Alan

1989-01-01T23:59:59.000Z

175

Thermography for Preventive Maintenance and Conservation  

E-Print Network [OSTI]

THERMOGRAPHY FOR PREVENTIVE MAINTENANCE AND CONSERVATION Tony Lopez Southern California Gas Company Los Angles, California The Supply Situation With fuel prices soaring, more and more companies are looking at energy management as a means... years. In the last twenty years, however, other applica tions have been developed for thermography. Some of these include: medicine, nondestructive testi:ng, aerial land mapping, preventive maintenance and conservation. The balance of this paper...

Lopez, T.

1979-01-01T23:59:59.000Z

176

Optimal Preventive Maintenance Under Decision Dependent Uncertainty  

SciTech Connect (OSTI)

We analyze a system of N components with dependent failure times. The goal is to obtain the optimal block replacement interval (different for each component) over a finite horizon that minimizes the expected total maintenance cost. In addition, we allow each preventive maintenance action to change the future joint failure time distribution. We illustrate our methodology with an example from South Texas Project Nuclear Operating Company. (authors)

Galenko, Alexander; Popova, Elmira [University of Texas at Austin, 1 University Station, Austin, Texas 78712 (United States); Kee, Ernie; Grantom, Rick [South Texas Project Nuclear Operating Company - STPNOC, P.O. Box 289, Wadsworth, Tx 77483 (United States)

2006-07-01T23:59:59.000Z

177

BLACK HISTORY MONTH  

Broader source: Energy.gov [DOE]

Black History Month is an annual celebration of achievements by black Americans and a time for recognizing the central role of African Americans in U.S. history. The event grew out of Negro History Week, created by historian Carter G. Woodson and other prominent African Americans. Other countries around the world, including Canada and the United Kingdom, also devote a month to celebrating black history.

178

APS Technical Update Index  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies |November 2011AstudiesRing Under Maintenance

179

Towards a maintenance and servicing indicator Pascal Vrignat 1  

E-Print Network [OSTI]

: Preventive Maintenance, Maintenance planning, Hidden Markov Model, Failure detection. 1 Introduction, events may be prevented by applying a correct maintenance policy. Some tankers may not have sunk if some maintenance had been correctly applied. Factory should not have exploded with some preventive control

Boyer, Edmond

180

Kernel spectral clustering for predicting maintenance of industrial machines  

E-Print Network [OSTI]

to deal with sensory faults have been used [1],[2],[3]: corrective maintenance, preventive maintenance the machine fails, it is expensive and safety and environment issues arise. Preventive maintenance is basedKernel spectral clustering for predicting maintenance of industrial machines Rocco Langone1, Carlos

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Grouping maintenance strategy with availability constraint under limited  

E-Print Network [OSTI]

with significant assumptions: maintenance durations are neglected and only one preventive maintenance for eachGrouping maintenance strategy with availability constraint under limited repairmen Phuc Do Van Hai maintenance strategies of multi-component systems by integrating two efficient optimization algorithms

Paris-Sud XI, Université de

182

Performance evaluation of centralized maintenance workshop by using Queuing Networks  

E-Print Network [OSTI]

maintenance types: Preventive maintenance: different actions are programmed in cycle periods; CorrectivePerformance evaluation of centralized maintenance workshop by using Queuing Networks Zineb Simeu: Maintenance workshop integrated in the job-shop system is required in order to maintain the production

Paris-Sud XI, Université de

183

Maintenance and long life of manjemen & pengelolaan dan  

E-Print Network [OSTI]

: SACA&D Maintenance ­ p.6 #12;ensure operability What does this mean? · preventive maintenanceMaintenance and long life of SACA&D manjemen & pengelolaan dan umur panjang Gerard van der Schrier KNMI BMKG: SACA&D Maintenance ­ p.1 #12;Why SACA&D extreme weather and food security Jakarta Post, 10

Stoffelen, Ad

184

Comparison of Selected Model Evaluation Criteria for Maintenance Applications  

E-Print Network [OSTI]

, Louisville, KY 40292, USA Model-based preventive maintenance relies on creating models that can either loss, and as a whole a sluggish system, the focus has shifted to preventive maintenance. Computerized maintenance systems aid in improving the efficiency of maintenance tasks [28]. The approach of preventive

Huang, Samuel H.

185

Optimal Maintenance Scheduling of a Gas Engine Power Plant  

E-Print Network [OSTI]

to carry out preventive maintenance at regular intervals19 . The maintenance schedule affects many short1 Optimal Maintenance Scheduling of a Gas Engine Power Plant using Generalized Disjunctive with parallel units. Gas engines are shutdown according to a regular maintenance plan that limits the number

Grossmann, Ignacio E.

186

University Marketing Communications UMC Web Site Maintenance Service  

E-Print Network [OSTI]

University Marketing Communications UMC Web Site Maintenance Service Overview Content management and ongoing Web site maintenance is an essential part of any Web project plan. When developing a new Web site in Web maintenance activities. Benefits Our Web maintenance service gives you ongoing access to our group

Sibille, Etienne

187

Updated 7/2012 EIGHT SEMESTER MAP FOR SECONDARY EDUCATION WITH AN ENGLISH  

E-Print Network [OSTI]

Updated 7/2012 EIGHT SEMESTER MAP FOR SECONDARY EDUCATION WITH AN ENGLISH LITERATURE SPECIALITY - Social Foundations of Education NATSCI 0270 - Science & Pre-History; Archaeology ENGLIT 0580 ­ Intro PSY 1001 ­ Intro to Education Psychology ENGLIT 1647 - Literature for Adolescents I & L 1332

Jiang, Huiqiang

188

APPROVED MINORS Updated on April 4, 2013  

E-Print Network [OSTI]

APPROVED MINORS Updated on April 4, 2013 Note: Please go to Department webpages for updates. Page 1;APPROVED MINORS Updated on April 4, 2013 Note: Please go to Department webpages for updates. Page 2 COLLEGE Studies Cinema Studies Classics Communication Dance Education English European Cultural Studies Forensics

New Hampshire, University of

189

maintenance. This research is relevant to opera-tions and maintenance challenges facing aging  

E-Print Network [OSTI]

the need for preventive maintenance or other diagnostic activities on the physical system. Simulationsmaintenance. This research is relevant to opera- tions and maintenance challenges facing aging-benefit of extending the time between overhauls. reducing the probability of a failure in the field. and preventive

190

IEAB Invasive Mussels Update September 2013 Invasive Mussels Update  

E-Print Network [OSTI]

....................................................... 16 8. Update on Mussel Control Agents Area MFWP Montana Fish Wildlife and Parks NASQAN National Stream Quality Accounting Network NGO Non, respectively, during 2012. A total of 109 mussel-infested boats were found during

191

Updated U.S. Geothermal Supply Curve  

SciTech Connect (OSTI)

This paper documents the approach used to update the U.S. geothermal supply curve. The analysis undertaken in this study estimates the supply of electricity generation potential from geothermal resources in the United States and the levelized cost of electricity (LCOE), capital costs, and operating and maintenance costs associated with developing these geothermal resources. Supply curves were developed for four categories of geothermal resources: identified hydrothermal (6.4 GWe), undiscovered hydrothermal (30.0 GWe), near-hydrothermal field enhanced geothermal systems (EGS) (7.0 GWe) and deep EGS (15,900 GWe). Two cases were considered: a base case and a target case. Supply curves were generated for each of the four geothermal resource categories for both cases. For both cases, hydrothermal resources dominate the lower cost range of the combined geothermal supply curve. The supply curves indicate that the reservoir performance improvements assumed in the target case could significantly lower EGS costs and greatly increase EGS deployment over the base case.

Augustine, C.; Young, K. R.; Anderson, A.

2010-02-01T23:59:59.000Z

192

Apply reliability centered maintenance to sealless pumps  

SciTech Connect (OSTI)

This paper reports on reliability centered maintenance (RCM) which is considered a crucial part of future reliability engineering. RCM determines the maintenance requirements of plants and equipment in their operating context. The RCM method has been applied to the management of critical sealless pumps in fire/toxic risk services, typical of the petrochemical industry. The method provides advantages from a detailed study of any critical engineering system. RCM is a team exercise and fosters team spirit in the plant environment. The maintenance strategy that evolves is based on team decisions and relies on maximizing the inherent reliability built into the equipment. RCM recommends design upgrades where this inherent reliability is being questioned. Sealless pumps of canned motor design are used as main reactor charge pumps in PVC plants. These pumps handle fresh vinyl chloride monomer (VCM), which is both carcinogenic and flammable.

Pradhan, S. (Exxon Chemicals Canada, Ontario (Canada))

1993-01-01T23:59:59.000Z

193

A Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL-MORELLO*, Noureddine ZERHOUNI*  

E-Print Network [OSTI]

- ing to different strategies (preventive maintenance, predictive maintenance, correc- tive maintenanceA Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL of information and communication technol- ogies has resulted in a variety of maintenance support systems

Paris-Sud XI, Université de

194

Updated 1-12 James F. Brice  

E-Print Network [OSTI]

, Shipyard Apprentice Programs, and Consolidation of Intermediate and Depot Level Maintenance Activities. #12

195

Kristie Stremel Oral History  

E-Print Network [OSTI]

Under the Rainbow: Oral Histories of GLBTQ People in Kansas Kristie Stremel Oral History Part 1 video platform video management video solutionsvideo player Part 2 video platform video management video solutionsvideo player... Part 3 video platform video management video solutionsvideo player Part 4 video platform video management video solutionsvideo player Return to Kristie Stremel Oral History in KU ScholarWorks Tami Albin, Director for Under the Rainbow...

Stremel, Kristie; Albin, Tami

2009-10-27T23:59:59.000Z

196

Steam Trap Maintenance as a Profit Center  

E-Print Network [OSTI]

the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 EXCUSES Everybody thinks his or her steam trap maintenance is good. Surveysl have shown the following are the most popular excuses encountered when managers are confronted... for steam traps. 192 ESL-IE-96-04-28 Proceedings from the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 5. Set up a trap maintenance program C. Prepare and present a report to that will: management on the results...

Bouchillon, J. L.

197

Progress Update: M Area Closure  

ScienceCinema (OSTI)

A progress update of the Recovery Act at work at the Savannah River Site. The celebration of the first area cleanup completion with the help of the Recovery Act.

Cody, Tom

2012-06-14T23:59:59.000Z

198

Gearbox Reliability Collaborative Update (Presentation)  

SciTech Connect (OSTI)

This presentation was given at the Sandia Reliability Workshop in August 2013 and provides information on current statistics, a status update, next steps, and other reliability research and development activities related to the Gearbox Reliability Collaborative.

Sheng, S.

2013-10-01T23:59:59.000Z

199

Agricultural and Resource Economics Update  

E-Print Network [OSTI]

corn prices, but crude oil prices are also relatively highSmith. What is the Price of Oil? ARE Update 11(5) (2008):ates with the prices of corn and crude oil. Until 2011 there

2012-01-01T23:59:59.000Z

200

Sign Up For Email Updates  

Broader source: Energy.gov [DOE]

Be the first to know of the latest developments from the Energy.gov team -- from videos to infographics to live Q&As -- by signing up for email updates.

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Updated 030613 University of California  

E-Print Network [OSTI]

Updated 030613 University of California Berkeley UC Berkeley Summer Sessions- ASTRON W12/EPS W12: The Solar System with MasteringAstronomy, 6/E. Jeffrey O. Bennett, et al. ISBN-10: 0321642678 ISBN-13

Walker, Matthew P.

202

Ksplice: Automatic Rebootless Kernel Updates  

E-Print Network [OSTI]

Ksplice allows system administrators to apply patches to their operating system kernels without rebooting. Unlike previous hot update systems, Ksplice operates at the object code layer, which allows Ksplice to transform ...

Kaashoek, M. Frans

2009-01-01T23:59:59.000Z

203

Microsoft Word - updated Recipient Webinar Transcript GL | Department...  

Broader source: Energy.gov (indexed) [DOE]

updated Recipient Webinar Transcript GL Microsoft Word - updated Recipient Webinar Transcript GL Microsoft Word - updated Recipient Webinar Transcript GL More Documents &...

204

Natural Resource Management Plan Update  

E-Print Network [OSTI]

wood industry, some farming in area of Solar Farm 3 #12;History of Natural Resource Management Formal

Homes, Christopher C.

205

ICD Complex Operations and Maintenance Plan  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

Gibson, P. L.

2007-06-25T23:59:59.000Z

206

Facilities Cost Pool: Maintenance Service Responsibilities  

E-Print Network [OSTI]

C 16 EXTERIOR LANDSCAPING University Standard FM FM C 17 EXTERIOR STD BUILDING SIGNS FM FM FM FM FMD 22 DATA POINT MONITORING Environmental building standard FM FM C Cost Pool: Maintenance Service Responsibilities 2 Table of Contents 3 Building Shell

Gulliver, Robert

207

Wind Energy Facility Reliability and Maintenance  

E-Print Network [OSTI]

Wind Energy Facility Reliability and Maintenance Eunshin Byon, Lewis Ntaimo, Chanan Singh and Yu related to wind energy facility reliability and mainte- nance focused more on qualitative aspects. In this chapter, we provide a comprehensive account of the existing research regarding wind energy facility

Ding, Yu

208

Reliable Link Maintenance in Cognitive Radio Systems  

E-Print Network [OSTI]

resources and overcome the under-utilization of licensed spectrum. Since the licensed user still keeps) have to vacate the spectrum in case the licensed user claims it. In order to maintain the qualityReliable Link Maintenance in Cognitive Radio Systems Daniel Willkomm, James Gross and Adam Wolisz

Gross, James

209

PPA Tools and Update  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDieselEnergyHistory May 3,3,10PORTFOLIO1 1 1234 PPA

210

David Ollington Oral History  

E-Print Network [OSTI]

Under the Rainbow: Oral Histories of GLBTQ People in Kansas David Ollington Oral History Part 1 video platform video management video solutionsvideo player Part 2 video platform video management video solutionsvideo player... Part 3 video platform video management video solutionsvideo player Part 4 video platform video management video solutionsvideo player Part 5 video platform video management video solutionsvideo player Return to David Ollington...

Ollington, David; Albin, Tami

2010-01-11T23:59:59.000Z

211

George Paris Oral History  

E-Print Network [OSTI]

Part 3 video platform video management video solutionsvideo player Part 4 video platform video management video solutionsvideo player Part 5 video platform video management video solutionsvideo player Part 6 video platform video... Under the Rainbow: Oral Histories of GLBTQ People in Kansas George Paris Oral History Part 1 video platform video management video solutionsvideo player Part 2 video platform video management video solutionsvideo player...

Paris, George; Albin, Tami

2010-01-11T23:59:59.000Z

212

Steven Brown Oral History  

E-Print Network [OSTI]

Part 4 video platform video management video solutionsvideo player Part 5 video platform video management video solutionsvideo player Part 6 video platform video management video solutionsvideo player Part 7 video platform video... Under the Rainbow: Oral Histories of GLBTQ People in Kansas Steven Brown Oral History Part 2 video platform video management video solutionsvideo player Part 3 video platform video management video solutionsvideo player...

Brown, Steven; Albin, Tami

2010-11-24T23:59:59.000Z

213

Microscale acceleration history discriminators  

DOE Patents [OSTI]

A new class of micromechanical acceleration history discriminators is claimed. These discriminators allow the precise differentiation of a wide range of acceleration-time histories, thereby allowing adaptive events to be triggered in response to the severity (or lack thereof) of an external environment. Such devices have applications in airbag activation, and other safety and surety applications.

Polosky, Marc A. (Albuquerque, NM); Plummer, David W. (Albuquerque, NM)

2002-01-01T23:59:59.000Z

214

BETO Announces Updated Multi-Year Program Plan: November 2014...  

Broader source: Energy.gov (indexed) [DOE]

update of the MYPP. Addthis Related Articles Update Released to BETO's Multi-Year Program Plan BETO Announces Updated Multi-Year Program Plan DOE Publishes Updated SSL R&D Plan...

215

NEMA Distribution Transformers, CCE Overview and Update presentation...  

Broader source: Energy.gov (indexed) [DOE]

Distribution Transformers, CCE Overview and Update presentation, dated 05242011 NEMA Distribution Transformers, CCE Overview and Update presentation, dated 05242011 This...

216

Energy Conservation Thru Steam Trap Surveys and Preventive Maintenance Programs  

E-Print Network [OSTI]

ENERGY CONSERVATION THRU STEAM TRAP SURVEYS AND PREVENTIVE MAINTENANCE PROGRAMS Terry Boynton, Armstrong, Three Rivers, Mich. Bob Dewhirst, Armstrong, New Braunfels, Texas. This paper will deal with steam trap surveys and preventive maintenance...

Boynton, T.; Dewhirst, B.

1980-01-01T23:59:59.000Z

217

WINCO maintenance before and after DOE 4330.4A  

SciTech Connect (OSTI)

This report discusses numerous elements of the maintenance program at the Idaho Chemical Processing Plant (ICPP) which have undergone changes during the last 5 years. Looking back, many of the maintenance program changes prior to 1991 were fragmented. Maintenance program elements were being ratcheted to address specific productivity and safety concerns. The improvements were warranted, but often improvements were implemented without a systematic review of how they impacted other maintenance program elements. After 1990 when WINCO began using the Chapter II guidelines of DOE Order 4330.4A as a maintenance program model, there was a marked improvement in the quality of the maintenance program changes. The post 1990 changes have been part of a systematic plan that has been communicated to all of the maintenance players. The Chapter II guidelines and the maintenance implementation plan (MIP) personnel with a focus for improvement that was missing prior to 1991.

Remsburg, R.E.

1993-04-27T23:59:59.000Z

218

History | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr FlickrGuidedCH2MLLC History Publications HistoryHistory of

219

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov [DOE]

Guide covers version 3.0 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

220

2006 INTEGRATED ENERGY POLICY REPORT UPDATE  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION 2006 INTEGRATED ENERGY POLICY REPORT UPDATE INTEGRATED ENERGY POLICY REPORT UPDATE January 3, 2007 Executive Summary Page E-2, first paragraph under conducted two cycles of renewable energy solicitations and negotiated a number of bilateral agreements

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Energy Storage Systems 2010 Update Conference Presentations ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Energy Storage Systems 2010 Update Conference Presentations - Day 2, Session 3 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

222

Energy Storage Systems 2010 Update Conference Presentations ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2 Energy Storage Systems 2010 Update Conference Presentations - Day 2, Session 2 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

223

Energy Storage Systems 2010 Update Conference Presentations ...  

Broader source: Energy.gov (indexed) [DOE]

of Day 2, chaired by NETL's Kim Nuhfer, are below. ESS 2010 Update Conference - Low Cost Energy Storage - Ted Wiley, Aquion.pdf Ess 2010 Update Conference - Solid State Li Metal...

224

Energy Storage Systems 2010 Update Conference Presentations ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

4 Energy Storage Systems 2010 Update Conference Presentations - Day 1, Session 4 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

225

Energy Storage Systems 2010 Update Conference Presentations ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1 Energy Storage Systems 2010 Update Conference Presentations - Day 1, Session 1 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

226

Energy Storage Systems 2010 Update Conference Presentations ...  

Broader source: Energy.gov (indexed) [DOE]

Terry Aselage, are below. ESS 2010 Update Conference - Advanced Stationary Electrical Energy Storage R&D at PNNL - Z Gary Yang, PNNL.pdf ESS 2010 Update Conference - A New...

227

Energy Storage Systems 2010 Update Conference Presentations ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Energy Storage Systems 2010 Update Conference Presentations - Day 1, Session 3 The U.S. DOE Energy Storage Systems Program (ESS) conducted a record-breaking Update Conference at...

228

Energy Storage Systems 2010 Update Conference Presentations ...  

Broader source: Energy.gov (indexed) [DOE]

chaired by ARPA-E's Mark Johnson, are below. ESS 2010 Update Conference - Electrochemical Energy Storage for the Grid - Yet-Ming Chiang, MIT.pdf ESS 2010 Update Conference - DOE...

229

Nano Communication Networks Update | GE Global Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nano Communication Networks Update Nano Communication Networks Update Steve Bush 2011.12.09 Hi everybody, In my last blog I talked about some of the work I have been doing...

230

Catalog Update 2006 International Education Abroad 1  

E-Print Network [OSTI]

Catalog Update 2006 International Education Abroad 1 INTERNATIONAL EDUCATION ABROAD 2005-2007 CATALOG UPDATE Changes effective 2006-2007 New Courses CHN 310 China Summer Study Abroad Program 6-7 hours

Gering, Jon C.

231

E-Print Network 3.0 - analyzing maintenance strategies Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OR I GI NAL AR T I C LE Summary: OSA-CBM Preventive maintenance Reliability-centered maintenance 1 Maintenance strategies... and motivations for health monitoring The...

232

Andrew Case "American Environmental History"  

E-Print Network [OSTI]

Andrew Case History "American Environmental History" Spring 2008 Advisor: William Cronon Classics, Richard. "It's Your Misfortune and None of My Own": A New History of the American West. (Norman

Wisconsin at Madison, University of

233

Kelli Cox Oral History  

E-Print Network [OSTI]

Oral history interview with Kelli Cox conducted by Lauren Helmer in Lawrence, Kansas, on December 30, 2010. In this inteview, Kelli Cox discusses her experiences attending a variety of churches in Lawrence, including the Christ Community Church...

Cox, Kelli; Helmer, Lauren

2010-12-30T23:59:59.000Z

234

Noah Hamilton Oral History  

E-Print Network [OSTI]

Oral history interview with Noah Hamilton conducted by Stephanie Meador in Topeka, Kansas, on November 20, 2009. In this interview, Noah Hamilton describes the experience of being raised in the Bah' faith. He discusses the tenets of Bah...

Hamilton, Noah; Meador, Stephanie Rae

2009-11-20T23:59:59.000Z

235

Black History Month  

Broader source: Energy.gov [DOE]

During National African American History Month, we pay tribute to the contributions of past generations and reaffirm our commitment to keeping the American dream alive for the next generation. In...

236

Vince Krische Oral History  

E-Print Network [OSTI]

Oral history interview with Father Vince Krische conducted by Timothy Miller in Lawrence, Kansas, on October 5, 2010. Father Krische served as the priest at the St. Lawrence Catholic Campus Center in Lawrence for 28 years, as the chaplain...

Krische, Vince; Miller, Timothy

2010-10-05T23:59:59.000Z

237

Garrett Fugate Oral History  

E-Print Network [OSTI]

Oral history interview with Garrett Fugate conducted by Jeremy Adkison in 2010. In this interview, University of Kansas student Garrett Fugate discusses his childhood experiences as a member of the Greek Orthodox community, and his eventual decision...

Fugate, Garrett; Adkison, Jeremy

2010-01-01T23:59:59.000Z

238

Kahler Wiebe Oral History  

E-Print Network [OSTI]

Oral history interview of Kahler Wiebe conducted by Jordan Roane in Lawrence, Kansas, on November 11, 2014. Kahler is 15 years old and the youngest member of the Wiebe family. The Wiebe family regularly attends Grace ...

Wiebe, Kahler; Roane, Jordan

2014-01-01T23:59:59.000Z

239

Warren Wiebe Oral History  

E-Print Network [OSTI]

Oral history interview of Warren Wiebe conducted by Jordan Roane in Lawrence, Kansas, on November 12, 2014. Warren grew up in the small western Kansas town of Hillsboro. Hillsboro is known for its Mennonite community as ...

Wiebe, Warren; Roane, Jordan

2014-01-01T23:59:59.000Z

240

Departmental History Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order describes the DOE history program and establishes policy and objectives for the preservation of historical records and institutional memory for DOE and its predecessor agencies. Cancels DOE 1324.7.

1992-03-26T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Modelling of dependence between critical failure and preventive maintenance  

E-Print Network [OSTI]

Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect that the failure can be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

Langseth, Helge

242

A MAINTENANCE MODEL FOR COMPONENTS EXPOSED TO SEVERAL FAILURE MECHANISMS  

E-Print Network [OSTI]

. The preventive maintenance (PM) is performed periodically with some fixed period , but PM can also be performed describe the "goodness" of the maintenance crew; their ability to prevent failures by performing thorough is assumed to undergo preventive maintenance (PM), usually at fixed time periods > 0. In addition

Langseth, Helge

243

Maintenance policy: degradation laws versus Hidden Markov Model availability indicator  

E-Print Network [OSTI]

INTRODUCTION Industrial processes need to be maintained to prevent breakdown. Some years ago, maintenance, logistic... Different kinds of maintenance policy can be applied: preventive or corrective according to manager strategies. In case of preventive maintenance, different strategies should be used like planned

Paris-Sud XI, Université de

244

Modelling of dependence between critical failure and preventive maintenance  

E-Print Network [OSTI]

Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

Langseth, Helge

245

`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES  

E-Print Network [OSTI]

part (McCall, 1963). Then an opportunistic maintenance is any action that combines a preventive`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES E. Levrat, E Vandoeuvre (France) Abstract: Today, a new role for maintenance exists to enhance the eco

Boyer, Edmond

246

Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies  

E-Print Network [OSTI]

Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies ABSTRACT Heavy of minimizing the makespan for a set of preventive maintenance (PM) tasks, requiring single- or multiple approach to the SA approach for this class of PM problems. Subject Area: Preventive Maintenance, Evolution

Terwilliger, Mark

247

Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1  

E-Print Network [OSTI]

when the need is discovered, but a good preventive maintenance program will reduce the number. This fact sheet will emphasize corrective and preventive maintenance procedures for ventilation, evaporativeAE26 Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1 D. E

Watson, Craig A.

248

Probabilistic service life prediction and maintenance planning of deteriorating structures  

E-Print Network [OSTI]

life prediction of a bridge pier and to the selection of a suitable preventive maintenance scenario. 1 with an aggressive environment, and to eventually plan a process of essential and/or preventive maintenance, some preventive maintenance scenario. 2 RELIABILITY OF DETERIORATING STRUCTURAL SYSTEMS The deterioration

Garavaglia, Elsa

249

Optimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective  

E-Print Network [OSTI]

. Numerical examples have shown that our model provides a preventive maintenance policy that slows downOptimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective Mariem Zouch, Thomas Yeung / IRCCyN, F-44307 NANTES Cedex, France Keywords: Road deterioration, maintenance optimization, Partially

Boyer, Edmond

250

Optimal Maintenance Scheduling of a Power Plant with Seasonal  

E-Print Network [OSTI]

-Wide Optimization Meeting · Plan preventive maintenance shutdowns ­ Minimize payment for skilled labor ­ Save onlineOptimal Maintenance Scheduling of a Power Plant with Seasonal Electricity Tariffs Pedro M. Castro maintenance team doing shutdowns · Shutdown period mandatory after [ , ] h online · Challenging (hard

Grossmann, Ignacio E.

251

IEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind  

E-Print Network [OSTI]

from sensors, our research objective is to derive an optimal observation and preventive maintenance TRANSACTIONS ON RELIABILITY 3 ACRONYMS NA no action PM preventive maintenance OB observation CM correctiveIEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind Turbine Systems Under

Ntaimo, Lewis

252

Single-machine Multiple-recipe Predictive Maintenance , John Hasenbein  

E-Print Network [OSTI]

preventative and corrective maintenance costs, holdings costs, and possibly production costs. An optimal policy. In a conventional preventive maintenance policy, it is typically assumed that the decision maker knows only when, conventional preventive maintenance policies are often one of two types: calendar-based or job

Hasenbein, John

253

Experiment #1 Maintenance of UV/vis Instruments  

E-Print Network [OSTI]

considerably worse than it should be. For these reasons, most companies have a preventive maintenance program that might be included in a preventive maintenance program for a UV-visible spectrometer. Your taskExperiment #1 Maintenance of UV/vis Instruments Objectives: 1. Learn how to use different UV

Nazarenko, Alexander

254

Analysis of Preventive Maintenance in Transactions Based Software Systems  

E-Print Network [OSTI]

Analysis of Preventive Maintenance in Transactions Based Software Systems Sachin Garg 1 , Antonio''. However, it incurs some overhead. The necessity to do preventive maintenance not only in general purpose to illustrate the usefulness and applicability of the models. Keywords: Preventive Maintenance, Transactions

Telek, Miklós

255

Maintenance Approaches For ARIES-CS Power Core  

E-Print Network [OSTI]

of Fusion Energy September 14-16, 2004 Madison, WI #12;2 Outline Introduction Reactor parameters Maintenance approach based on field-period units Modular maintenance approach through selected ports Maintenance approach with ports between all the modular coils Summary and conclusion #12;3 Introduction The engineering

256

Software Maintenance and Evolution: Keith Bennett & Vaclav Rajlich  

E-Print Network [OSTI]

for change and improvements. Our aim is to describe a landscape for research in software maintenanceSoftware Maintenance and Evolution: A Roadmap Keith Bennett & Vaclav Rajlich Key Research Pointers transformation techniques. He is a founding co-Director of the Centre for Software Maintenance at Durham

257

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

2007-02-13T23:59:59.000Z

258

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

2010-04-21T23:59:59.000Z

259

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Cancels DOE O 433.1A. Admin Chg 1, dated 3-12-2013, cancels DOE O 433.1B.

2010-04-21T23:59:59.000Z

260

Ryan Campbell Oral History  

E-Print Network [OSTI]

Under the Rainbow: Oral Histories of GLBTQ People in Kansas Ryan Campbell Oral History Part 1 video platform video management video solutionsvideo player Part 2 video platform video management video solutionsvideo player... Lawrence, KS 66045 Requestors must identify: 1. Type of publication 2. Proposed title 3. Specific passages to be quoted 4. Anticipated uses of the passages 5. Publisher's name 6. Expected date of publication ...

Campbell, Ryan; Albin, Tami

2009-12-16T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

ECONOMICS UPDATE Issue 1 Autumn 2014  

E-Print Network [OSTI]

ECONOMICS UPDATE Issue 1 Economics Update Autumn 2014 UNIVERSITY OF ABERDEEN ­ DEPARTMENT OF ECONOMICS IN THIS ISSUE Welcome to the first Economics update! In this twice-yearly publication, we. In the Research Assessment Exercise results of 2008, 100% of Economics research, was judged to be of international

Levi, Ran

262

Software Update Recovery for Wireless Sensor Networks  

E-Print Network [OSTI]

mechanism that uses loss-of- control to provide high-reliability, low energy, software updates, includingSoftware Update Recovery for Wireless Sensor Networks Stephen Brown1 and Cormac J. Sreenan2 1 Laboratory, University College Cork, Ireland Abstract. Updating software over the network is important

Sreenan, Cormac J.

263

Catalog Update 2006 Math & Computer Science 1  

E-Print Network [OSTI]

Catalog Update 2006 Math & Computer Science 1 MATH AND COMPUTER SCIENCE DIVISION 2005-2007 CATALOG UPDATE Changes effective 2006-2007 Degree Update COMPUTER SCIENCE BACHELOR OF SCIENCE Semester Hours CS 100 Computer Science Seminar.........................1 CS 180 Foundations of Computer Science I

Gering, Jon C.

264

Opportunity for feedback Opportunity for updates  

E-Print Network [OSTI]

Opportunity for feedback Opportunity for updates Opportunity to find out all of the things I don) What do these all mean? Vision (1) Values (5-10) Strategic Priorities (5-7) Education, scholarship update Research Plan Pinnacles or not? Focus on impact Update every 3 yrs Capital Plan Existing

265

Review of maintenance personnel practices at nuclear power plants  

SciTech Connect (OSTI)

As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations.

Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

1984-05-01T23:59:59.000Z

266

Waste Sampling and Characterization Facility (WSCF). Maintenance Implementation Plan  

SciTech Connect (OSTI)

This Maintenance Implementation Plan has been developed for maintenance functions associated with the Waste Sampling and Characterization Facility (WSCF). This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4A guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at WSCF.

Bozich, J.L.

1993-07-01T23:59:59.000Z

267

BOOKS & MEDIA UPDATE Carbon Nanotechnology  

E-Print Network [OSTI]

of organic semiconductors are introduced in this book, which also gives a clear impression of the rangeBOOKS & MEDIA UPDATE Carbon Nanotechnology Liming Dai (ed.) Elsevier · 2006 · 750 pp ISBN: 0 are reviewed. Contributions by different authors are grouped into three sections on the synthesis, chemistry

Elliott, James

268

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

269

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

270

Task Group 9 Update (Presentation)  

SciTech Connect (OSTI)

This presentation is a brief update of IEC TC82 QA Task Force, Group 9. Presented is an outline of the recently submitted New Work Item Proposal (NWIP) for a Comparative Thermal Cycling Test for CPV Modules to Differentiate Thermal Fatigue Durability.

Bosco, N.

2014-04-01T23:59:59.000Z

271

Updated July 2009 Operations Organization  

E-Print Network [OSTI]

All-Hands, Brown Bags, and COO Open-Door sessions Ongoing Conduct Operations Employee Climate SurveysOperations Strategic Plan Updated July 2009 #12;Operations Organization Chief Operating Officer deliver exceptional operational services in support of the scientific mission of Berkeley Lab. goals

Eisen, Michael

272

Progress Update: Stack Project Complete  

SciTech Connect (OSTI)

Progress update from the Savannah River Site. The 75 foot 293 F Stack, built for plutonium production, was cut down to size in order to prevent injury or release of toxic material if the structure were to collapse due to harsh weather.

Cody, Tom

2010-01-01T23:59:59.000Z

273

Update: Proposed CE Curriculum & Program  

E-Print Network [OSTI]

Update: Proposed CE Curriculum & Program Bruce Jacob, End of Summer 2008 #12;What's all this, then, students, graduates · Held constituents' meeting over winter · Group vote this curriculum Barua has agreed to develop and teach the course ENEE 3xx (Digital systems) -- new course Bruce Jacob

Jacob, Bruce

274

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20

275

Progress Update: Stack Project Complete  

ScienceCinema (OSTI)

Progress update from the Savannah River Site. The 75 foot 293 F Stack, built for plutonium production, was cut down to size in order to prevent injury or release of toxic material if the structure were to collapse due to harsh weather.

Cody, Tom

2012-06-14T23:59:59.000Z

276

Drought Update Colorado Climate Center  

E-Print Network [OSTI]

Drought Update Colorado Climate Center Roger Pielke, Sr., Director Prepared by Tara Green and Odie Bliss http://climate.atmos.colostate.edu #12;© 2003 by The Colorado Climate Center. 2 http://www.ncdc.noaa.gov/oa/climate/research/2003/mar/st005dv00pcp200303.html #12;© 2003 by The Colorado Climate Center. 3 #12;© 2003

277

Updated database plus software for line-mixing in CO2 infrared spectra and their test using laboratory spectra  

E-Print Network [OSTI]

Updated database plus software for line-mixing in CO2 infrared spectra and their test using e i n f o Article history: Received 9 February 2010 Received in revised form 9 March 2010 Accepted 9-mixing into account and the corresponding database/software package were described and widely tested. In this study

Chance, Kelly

278

Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid  

E-Print Network [OSTI]

Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid-Linear Model, Expert Opinion, Complexity Reduction, Maintenance. 1 Introduction Preventive maintenance became essential. Preventive maintenance of a system is taking into account expert knowledge, feedback

Paris-Sud XI, Université de

279

Condition-based maintenance under an imperfect repair policy for a deteriorating production system  

E-Print Network [OSTI]

is periodically monitored. Imperfect preventive maintenance activities, which restore the production system policy, both linear and non-linear imperfect preventive maintenance cost functions are investigated preventive maintenance (or preventive replacement) is usually used. After each preventive maintenance action

Boyer, Edmond

280

Maintenance decision making tool reaching a compromise between maintainability and reliability performances  

E-Print Network [OSTI]

or scheduled preventive maintenance) to condition-based or predictive maintenance strategies preventive maintenance actions, in the sense that planned production stoppages within this temporal horizonMaintenance decision making tool reaching a compromise between maintainability and reliability

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System Equipment  

E-Print Network [OSTI]

most state of the art reliability centered maintenance (RCM) approaches, but it also accounts equipment, maintenance, reliability, risk, security, optimization 1.Introduction Maintenance of bulk1 Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System

282

Proactive maintenance initiatives at Argonne National Laboratory-West  

SciTech Connect (OSTI)

In the late 1980`s, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ``mentor`` roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I&C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned.

Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

1995-06-01T23:59:59.000Z

283

Steam turbine path evaluation during maintenance  

SciTech Connect (OSTI)

The deterioration of a turbine (Steam & Gas) flow path affects the efficiency of the turbine. The most critical factors which affect the efficiency of turbines are: wearing out of the trailing edges of the blades by solid particle erosion, deposits, material loss due to corrosion (also sand blast) which increases the flow area, increases in blade surface roughness, etc. Wearing out of the seals caused by shaft vibrations or rapid start-up leads to significant leakage losses. Some of these effects can be estimated with some precision during operation of the turbine, but an exact evaluation can be carried out during a maintenance applying a special fluid flow analysis program. Such a program has been developed and then adapted to achieve this goal. During maintenance the complete geometry of the steam path is measured (blades lengths, widths, angles, clearances, etc.) in the condition encountered before any corrections. Then the similar measurement is undertaken after, for example, clearance corrections, blade replacements, cleaning of the blades, etc. Using the program first of all the design data is calculated. Then the actual data is fed into the program and compared to the design data. Thus the effect of the blade surface roughness, increased seal clearances, flow area increase, solid particle damage to the trailing edge and so on for each particular stage is calculated. The effect is expressed in [kW] as a deviation from the design points. This data can be helpful during online evaluation of the turbine performance. This evaluation helps the management of the plant in undertaking the correct decision concerning the date of the next major maintenance and replacement part procurement. Many turbines in the Mexican utility have been evaluated in such a manner. Some examples are presented.

Kubiak, J.; Angel, F. del; Carnero, A.; Campos, A. [Instituto de Investigaciones Electricas, Temixo, Morelos (Mexico)] [and others

1996-07-01T23:59:59.000Z

284

Sandia National Laboratories: Operations and Maintenance Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLSMolten-Salt StorageNoLong Range Radar StationReportsMaintenance

285

Michael Johnson Oral History  

E-Print Network [OSTI]

support groups or whatever like that and then it just turned into, Well there's Michael Johnson January 4, 2009 5 Under the Rainbow: Oral Histories of GLBTIQ People in Kansas porn online too. (laugh) So it's likeit's like you just kind... stepmother had found my Xanga site as well. Along with that she had found, on his computer, links to porn sitelike gay porn Michael Johnson January 4, 2009 7 Under the Rainbow: Oral Histories of GLBTIQ People in Kansas sites, right...

Johnson, Michael; Albin, Tami

2009-12-16T23:59:59.000Z

286

History | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG | Department ofHTS Cable ProjectsHistory History On January 7, 2011, the

287

History | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun withconfinement plasmas in theinPlasticsreduction TheHistory History An error

288

Fitness for duty in the nuclear industry: Update of the technical issues 1996  

SciTech Connect (OSTI)

The purpose of this report is to provide an update of information on the technical issues surrounding the creation, implementation, and maintenance of fitness-for-duty (FFD) policies and programs. It has been prepared as a resource for Nuclear Regulatory Commission (NRC) and nuclear power plant personnel who deal with FFD programs. It contains a general overview and update on the technical issues that the NRC considered prior to the publication of its original FFD rule and the revisions to that rule (presented in earlier NUREG/CRs). It also includes chapters that address issues about which there is growing concern and/or about which there have been substantial changes since NUREG/CR-5784 was published. Although this report is intended to support the NRC`s rule making on fitness for duty, the conclusions of the authors of this report are their own and do not necessarily represent the opinions of the NRC.

Durbin, N.; Grant, T. [eds.] [Battelle Seattle Research Center, WA (United States)

1996-05-01T23:59:59.000Z

289

A cask maintenance facility feasibility study  

SciTech Connect (OSTI)

The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1989-01-01T23:59:59.000Z

290

Second Line of Defense Help Desk: Electronic Maintenance Reports - Local Maintenance Provider User Guide Rev. 1  

SciTech Connect (OSTI)

The Electronic Maintenance Report forms present a uniform dataset for analysis of Sustainability metrics. These forms collect readily minable data while allowing the attachment of site-specific checklists or other supporting files for review by the Sustainability Manager and Program Management.

Leigh, Richard J.

2011-12-14T23:59:59.000Z

291

Brian Hamilton History Department  

E-Print Network [OSTI]

Trade. Albuquerque: University of New Mexico Press, 2000. Calloway, Colin G. New Worlds for All: Indians and Antislavery Reform. Amherst: University of Massachusetts Press, 1991. Andrews, Thomas G. Killing for Coal Revolution: A History of Capitalism. New York: W. W. Norton & Company, 2010. Appleby, Joyce Oldham. "The

Wisconsin at Madison, University of

292

Brian Hamilton History Department  

E-Print Network [OSTI]

, Nasty Wenches, and Anxious Patriarchs: Gender, Race, and Power in Colonial Virginia. Chapel Hill. Gomez, Michael A. Exchanging Our Country Marks: The Transformation of African Identities in the Colonial of Social History 37, no. 1 (2003): 113-124. Johnson, Walter. Soul by Soul: Life inside the Antebellum Slave

Wisconsin at Madison, University of

293

Exploring Mars' Climate History  

E-Print Network [OSTI]

Exploring Mars' Climate History #12;2 Mars Reconnaissance Orbiter ESA Mars Express (NASA: MARSIS by studying the solar wind and other interactions with the Sun. #12;The solar wind is a high-speed stream of electrons and protons released from the Sun. #12;High-energy photons (light) stream constantly from the Sun

294

TRUPACT-II Operating and Maintenance Instructions  

SciTech Connect (OSTI)

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

Westinghouse Electric Corporation, Waste Isolation Division

1999-12-31T23:59:59.000Z

295

Simple Maintenance Saves Costly Furnace Repair/Replacement |...  

Broader source: Energy.gov (indexed) [DOE]

furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the...

296

Article Published on LED Lumen Maintenance and Light Loss Factors...  

Broader source: Energy.gov (indexed) [DOE]

of a comprehensive lifetime rating - as well as the problematic relationship between SSL lifetime and lumen maintenance - determining an appropriate LLD factor for LED products...

297

ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE  

SciTech Connect (OSTI)

The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

Trapp, D.

2014-08-25T23:59:59.000Z

298

Joint Maintenance Status Report of Potomac Electric Power Company...  

Broader source: Energy.gov (indexed) [DOE]

pursuant to the December 20. 2006, Department of Energy ("DOE") Order No. 202-05-3. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection,...

299

Technical information report: Plasma melter operation, reliability, and maintenance analysis  

SciTech Connect (OSTI)

This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

Hendrickson, D.W. [ed.

1995-03-14T23:59:59.000Z

300

Optimal forest management for carbon sequestration and biodiversity maintenance.  

E-Print Network [OSTI]

??Managing planted forests for carbon sequestration and biodiversity maintenance has become increasingly important in times of rapid climate change and the loss of biodiversity worldwide. (more)

Nghiem, Thi Hong Nhung

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Proposed Update February 10, 2014 Proposed First Update to the Climate Change Scoping Plan  

E-Print Network [OSTI]

.......................................................................................... 5 E. Process for Developing the Update.................................................................... 30 B. Foster Resilient Economic Growth Economic Sectors .................................................................................. 40 1

California at Davis, University of

302

Preventative maintenance plan for emergency pumping trailers  

SciTech Connect (OSTI)

The purpose/goal of this document is to identify the maintenance requirements and resources available to properly maintain the readiness and condition of the Emergency Pumping Equipment controlled by the Tank Waste Remediation System Tank Farms Plant Engineering and Tank Stabilization Operations. This equipment is intended to pump a single-shell tank (SST) that has been identified as an assumed leaking tank. The goal is to commence pumping (submersible or jet) as soon as safely possible after identifying a SST as an assumed leaking tank. Important information pertaining to the Emergency Pumping Equipment, Over-Ground Piping installation, and procedures is found in WHC-SD-WM-AP-005, ``Single Shell Tank Leak Emergency Pumping Guide.``

Wiggins, D.D.

1994-09-01T23:59:59.000Z

303

Using Signature Analysis for Maintenance Planning  

E-Print Network [OSTI]

-25, 1979 From this survey, which we hold to be a typical representation of rotating machinery applications, it was concluded that vibration monitoring programs can be designed to produce a significant amount of machinery condition information... type, history, and ongoing in-house monitoring practices, the data points and frequency of surveillance are established (normally 1 or 2-month cycles with variations, e.g. critical ~achinery could be surveyed each month and peripheral machinery on a...

Babson, P. E.

1979-01-01T23:59:59.000Z

304

BPAT Systems Update - October 10, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Update Posted Date: 10102014 On Thursday,...

305

Microsoft Word - updated Recipient Webinar Transcript - Contractor...  

Broader source: Energy.gov (indexed) [DOE]

to the Department of Energy&8217;s Recovery Act webinar on reporting in to federalreporting Microsoft Word - updated Recipient Webinar Transcript GL Webinar-Transcript-Repeat.pdf...

306

Energy Lawyer and Contracting Officer Update  

Broader source: Energy.gov (indexed) [DOE]

Contracting Officers Update Federal Utility Partnership Working Group Biloxi, Mississippi Julia Kelley Oak Ridge National Laboratory May 6, 2009 2 Since the November 2008 meeting:...

307

Progress Update: P-Reactor Grout  

SciTech Connect (OSTI)

A progress update, the Recovery Act at work at the Savannah River Site. The new phase of work on the permanent closure of two cold war nuclear reactors.

Cody, Tom

2010-01-01T23:59:59.000Z

308

Progress Update: P-Reactor Grout  

ScienceCinema (OSTI)

A progress update, the Recovery Act at work at the Savannah River Site. The new phase of work on the permanent closure of two cold war nuclear reactors.

Cody, Tom

2012-06-14T23:59:59.000Z

309

PAVEMENT TECHNOLOGY UPDATE This Technology Transfer Program  

E-Print Network [OSTI]

PAVEMENT TECHNOLOGY UPDATE This Technology Transfer Program publication is funded by the Division to them in California. TECHNOLOGY TRANSFER PROGRAM MAY 2011, VOL. 3, NO. 1 California's Transition

California at Berkeley, University of

310

Overview of Governor's Biofuels Coalition and Updates  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Governor's Biofuels Coalition and Updates Stacey Simms Governor's Energy Office Biofuels and Local Fuels Program Colorado will have the infrastructure on line when advanced...

311

Canadian Fuel Cell Commercialization Roadmap Update: Progress...  

Open Energy Info (EERE)

Commercialization Roadmap Update: Progress of Canada's Hydrogen and Fuel Cell Industry Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Canadian Fuel Cell...

312

Fibrations and universal view updatability Michael Johnson  

E-Print Network [OSTI]

Fibrations and universal view updatability Michael Johnson Computing Department, Macquarie methods to manage the complexity. Dampney and Johnson [25] first showed how data models based on entity

Johnson, Michael

313

Fibrations and universal view updatability Michael Johnson  

E-Print Network [OSTI]

Fibrations and universal view updatability Michael Johnson Computing Department, Macquarie and Johnson [25] first showed how data models based on entity-relationship (ER) diagrams [10] are enhanced

Rosebrugh, Robert

314

Energy Storage Systems 2010 Update Conference Presentations ...  

Broader source: Energy.gov (indexed) [DOE]

session are below. ESS 2010 Update Conference - Fuel-Free, Ubiquitous, Compressed Air Energy Storage and Power Conditioning - David Marcus, General Compression.pdf ESS 2010...

315

Updating Interconnection Screens for PV System Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Abraham Ellis, Roger Hill Sandia National Laboratories Tom Key, Kristen Nicole, Jeff Smith Electric Power Research Institute Updating Interconnection Screens for PV System...

316

Recovery Act Progress Update: Reactor Closure Feature  

SciTech Connect (OSTI)

A Recovery Act Progress Update. Decommissioning of two nuclear reactor sites at the Department of Energy's facilities has been approved and is underway.

Cody, Tom

2010-01-01T23:59:59.000Z

317

Recovery Act Progress Update: Reactor Closure Feature  

ScienceCinema (OSTI)

A Recovery Act Progress Update. Decommissioning of two nuclear reactor sites at the Department of Energy's facilities has been approved and is underway.

Cody, Tom

2012-06-14T23:59:59.000Z

318

Blandford_2007_MonthlyUpdate_August.doc Data Update for Blandford, MA  

E-Print Network [OSTI]

Update_August.doc Data Summary Statistics A summary of the data during the reporting period are included in the following://www.ceere.org/rerl/rerl_resourcedata.html. Data Recovery All raw wind data are subjected to a series of tests and filters to identify dataBlandford_2007_MonthlyUpdate_August.doc Data Update for Blandford, MA August, 2007 Prepared

Massachusetts at Amherst, University of

319

Blandford_2007_MonthlyUpdate_September.doc Data Update for Blandford, MA  

E-Print Network [OSTI]

Update_September.doc Data Summary Statistics A summary of the data during the reporting period are included in the following://www.ceere.org/rerl/rerl_resourcedata.html. Data Recovery All raw wind data are subjected to a series of tests and filters to identify dataBlandford_2007_MonthlyUpdate_September.doc Data Update for Blandford, MA September, 2007 Prepared

Massachusetts at Amherst, University of

320

Lin Tongqi : an oral history  

E-Print Network [OSTI]

In this thesis, I explore the life of Professor Lin Tongqi, a well-known scholar of American Chinese studies, by using an oral history methodology. This oral history is named "Suffering and Thinking," and my goal is to ...

Chen, Xin, S.M. Massachusetts Institute of Technology

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

International Data on Educational Attainment: Updates and Implications  

E-Print Network [OSTI]

International Data on Educational Attainment: Updates and Implications Robert J. Barro and Jong Papers #12;International Data on Educational Attainment: Updates and Implications Robert J. Barro Development at Harvard University. #12;1 International Data on Educational Attainment: Updates

322

NATIONAL MUSEUM OF NATURAL HISTORY  

E-Print Network [OSTI]

NATIONAL MUSEUM OF NATURAL HISTORY Annual Report 2004 #12;2 NATIONAL MUSEUM OF NATURAL HISTORY · www.mnh.si.edu The revitalization of the National Museum of Natural History proceeded at a rapid pace, innovation and solid groundwork for future growth. The Museum's agenda is an active one. As with any

Mathis, Wayne N.

323

Field Museum of Natural History  

E-Print Network [OSTI]

Field Museum of Natural History Financial Statements as of and for the Years Ended December 31' Report #12;FIELD MUSEUM OF NATURAL HISTORY TABLE OF CONTENTS Page INDEPENDENT AUDITORS' REPORT 1 AUDITORS' REPORT To the Board of Trustees of Field Museum of Natural History: We have audited

Patterson, Bruce D.

324

Field Museum of Natural History  

E-Print Network [OSTI]

Field Museum of Natural History Financial Statements as of and for the Years Ended December 31 Auditors' Report #12;FIELD MUSEUM OF NATURAL HISTORY TABLE OF CONTENTS Page INDEPENDENT AUDITORS' REPORT 1 Expenditures 22­23 #12;INDEPENDENT AUDITORS' REPORT To the Board of Trustees of Field Museum of Natural History

Patterson, Bruce D.

325

Microsoft Word - All Discounts updated February 2015  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

members a 10% discount on labor for any hard surface installation, i.e., custom tile, granite, hardwood floors, and maintenance and repair. For more information contact Rick...

326

05.01 1 Budget Maintenance and Development REGENTS' POLICY  

E-Print Network [OSTI]

05.01 1 Budget Maintenance and Development REGENTS' POLICY PART V FINANCE AND BUSINESS MANAGEMENT Chapter 05.01 - Budget Development and Maintenance P05.01.010. Budget Policy. A. The budget by their respective annually adopted budgets and approved amendments, in accordance with procedure established

Pantaleone, Jim

327

Modeling Web Maintenance Centers Through Queue Models M. Di Penta  

E-Print Network [OSTI]

Modeling Web Maintenance Centers Through Queue Models M. Di Penta , G. Casazza ¡ , G. Antoniol´eal Abstract The Internet and WEB pervasiveness are changing the landscape of several different areas ranging from infor- mation gathering/managing and commerce to software development, maintenance and evolution

Di Penta, Massimiliano

328

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1  

E-Print Network [OSTI]

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1 Office of Postdoctoral Maintenance Screen. All starting points begin before the popup menu comes up. In Internet Explorer the Orientation to Landscape, and click OK. Print as needed to either your printer or to Adobe PDF (only works

Kay, Mark A.

329

STANDARD OPERATING PROCEDURES Sampler Maintenance by Site Operators  

E-Print Network [OSTI]

IMPROVE STANDARD OPERATING PROCEDURES SOP 201 Sampler Maintenance by Site Operators Date Last.0 PURPOSE AND APPLICABILITY This standard operating procedure (SOP) describes the procedures and schedules. The procedural steps for weekly maintenance and repairs performed by the site operator are included in TI 201A

Fischer, Emily V.

330

National Science Bowl Update: Middle School Teams from Maryland...  

Broader source: Energy.gov (indexed) [DOE]

Science Bowl Update: Middle School Teams from Maryland and Indiana to Compete for National Championship on Monday National Science Bowl Update: Middle School Teams from Maryland...

331

NEMA Lighting, CCE Overview and Update presentation, dated 05...  

Broader source: Energy.gov (indexed) [DOE]

Equipment-- AHRI Annual Meeting CCE Overview and Update Presenation, dated April 13, 2011 NEMA Distribution Transformers, CCE Overview and Update presentation, dated 05242011...

332

Appliance Standards Program Schedule - CCE Overview and Update...  

Broader source: Energy.gov (indexed) [DOE]

Meeting CCE Overview and Update Presenation, dated April 13, 2011 NEMA Distribution Transformers, CCE Overview and Update presentation, dated 05242011 Appliance Standards Program...

333

CEA ? External Power Supplies, CCE Overview and Update presentation...  

Broader source: Energy.gov (indexed) [DOE]

& Publications AHAM - CCE Overview and Update, dated 06072011 NEMA Distribution Transformers, CCE Overview and Update presentation, dated 05242011 NEMA Lighting, CCE Overview...

334

Update on Diesel Exhaust Emission Control Technology and Regulations...  

Broader source: Energy.gov (indexed) [DOE]

Update on Diesel Exhaust Emission Control Technology and Regulations Update on Diesel Exhaust Emission Control Technology and Regulations 2004 Diesel Engine Emissions Reduction...

335

Energy Lawyers and Contracting Officers Update | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Update Energy Lawyers and Contracting Officers Update Presentation-given at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meeting-discusses draft guidance on...

336

2011 Residential Energy Efficiency Technical Update Meeting Summary...  

Energy Savers [EERE]

2011 Residential Energy Efficiency Technical Update Meeting Summary Report: Denver, Colorado - August 9-11, 2011 2011 Residential Energy Efficiency Technical Update Meeting Summary...

337

Update of Hydrogen from Biomass - Determination of the Delivered...  

Office of Environmental Management (EM)

Update of Hydrogen from Biomass - Determination of the Delivered Cost of Hydrogen: Milestone Completion Report Update of Hydrogen from Biomass - Determination of the Delivered Cost...

338

Appliance Standards Program Schedule - CCE Overview and Update...  

Broader source: Energy.gov (indexed) [DOE]

Products and Commercial and Industrial Equipment-- AHRI Annual Meeting CCE Overview and Update Presenation, dated April 13, 2011 AHAM - CCE Overview and Update, dated 0607...

339

Home Energy Score Update: New Simulation Training & Credential...  

Energy Savers [EERE]

Home Energy Score Update: New Simulation Training & Credential Requirements for Assessors Home Energy Score Update: New Simulation Training & Credential Requirements for Assessors...

340

Home Energy Score Update: New Simulation Training and Credential...  

Office of Environmental Management (EM)

Update: New Simulation Training and Credential Requirements for Assessors Home Energy Score Update: New Simulation Training and Credential Requirements for Assessors Home Energy...

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

V-004: Oracle Critical Patch Update Advisory- October 2012  

Broader source: Energy.gov [DOE]

October 2012 Critical Patch Update, security vulnerability fixes for proprietary components of Oracle Linux will be announced in Oracle Critical Patch Updates.

342

Pepco Update on Current Construction Work and Mirant Generation...  

Energy Savers [EERE]

Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage Pepco Update on Current Construction Work and Mirant Generation Needs for...

343

Updated: September 9, 2013 Queen's University Faculty of Education  

E-Print Network [OSTI]

Updated: September 9, 2013 Queen's University Faculty of Education Aboriginal Teacher Education of Practicum Review Process section has been completed. #12;Updated: September 9, 2013 Outcomes

Abolmaesumi, Purang

344

Geothermal Update NATIONAL ACADEMY OF SCIENCES / NOVEMBER 4,...  

Broader source: Energy.gov (indexed) [DOE]

Update NATIONAL ACADEMY OF SCIENCES NOVEMBER 4, 2013 Geothermal Update NATIONAL ACADEMY OF SCIENCES NOVEMBER 4, 2013 GTO-NAS.pdf More Documents & Publications GEA Geothermal...

345

Hydrogen and Fuel Cell Technologies Update: 2010 Fuel Cell Seminar...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen and Fuel Cell Technologies Update: 2010 Fuel Cell Seminar and Exposition Hydrogen and Fuel Cell Technologies Update: 2010 Fuel Cell Seminar and Exposition Presentation by...

346

Hydrogen and Fuel Cell Technologies Update: 2010 Fuel Cell Seminar...  

Energy Savers [EERE]

Update: 2010 Fuel Cell Seminar and Exposition Hydrogen and Fuel Cell Technologies Update: 2010 Fuel Cell Seminar and Exposition Presentation by Sunita Satyapal at the 2010 Fuel...

347

U-019: Oracle Critical Patch Update Advisory- October 2011  

Broader source: Energy.gov [DOE]

October 2011 Critical Patch Update, security vulnerability fixes for proprietary components of Oracle Linux will be announced in Oracle Critical Patch Updates.

348

Update on Franklin retirement plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500II Field Emission SEM with EDAX (For3WebinarUpdate

349

Program Updates | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems Engineering Research and Development (PSE R&D)REPORTServicesProgram Update:

350

TINSSL Update | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy StrainClient update resolve008Energy 8 -THEShaleTHISTINSSL

351

Sandy Updates | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' Research |Regulation Services2014 Update |Department23ICEhandbook isQEROn

352

Green Sturgeon (Acipenser medirostris) Status Review Update  

E-Print Network [OSTI]

Green Sturgeon (Acipenser medirostris) Status Review Update Biological Review Team Santa Cruz Status of Green Sturgeon 1 3. Key Questions in ESA Determination 3 a. The "Species" Question 3 b. The Extinction Risk Question 4 c. "A significant portion of the species' range" issue 4 Recently Updated Green

353

Retail Lighting: Title 24 & Technology Update  

E-Print Network [OSTI]

Retail Lighting: Title 24 & Technology Update Kelly Cunningham Outreach Director kcunning@ucdavis.edu California Lighting Technology Center, UC Davis RESEARCH . INNOVATION . PARTNERSHIP Supporting compliance Lighting: Title 24 and Technology Update C00005 Kelly Cunningham April 24,2014 #12;Credit(s) earned

California at Davis, University of

354

California Energy Commission STAFF UPDATE REPORT  

E-Print Network [OSTI]

with California energy policy goals, called the planning renewable net short throughout this document California Energy Commission STAFF UPDATE REPORT NEW RENEWABLE GENERATION NEEDED TO COMPLY WITH POLICY GOALS: UPDATE FOR 2022 PLANNING CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor

355

Data Update for Paxton, MA December, 2006  

E-Print Network [OSTI]

Data Update for Paxton, MA December, 2006 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for December, 2006 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

356

Data Update for Paxton, MA November, 2006  

E-Print Network [OSTI]

Data Update for Paxton, MA November, 2006 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for November, 2006 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

357

Data Update for Paxton, MA February, 2005  

E-Print Network [OSTI]

Data Update for Paxton, MA February, 2005 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for February, 2005 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

358

Data Update for Paxton, MA January, 2006  

E-Print Network [OSTI]

Data Update for Paxton, MA January, 2006 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for January, 2006 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

359

Data Update for Paxton, MA Prepared for  

E-Print Network [OSTI]

Data Update for Paxton, MA May, 2006 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for May, 2006 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per the WSG84

Massachusetts at Amherst, University of

360

Data Update for Paxton, MA September, 2006  

E-Print Network [OSTI]

Data Update for Paxton, MA September, 2006 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for September, 2006 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Data Update for Paxton, MA October, 2004  

E-Print Network [OSTI]

Data Update for Paxton, MA October, 2004 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for October, 2004 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

362

Data Update for Paxton, MA Prepared for  

E-Print Network [OSTI]

Data Update for Paxton, MA June, 2006 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for June, 2006 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per the WSG84

Massachusetts at Amherst, University of

363

Data Update for Paxton, MA April, 2005  

E-Print Network [OSTI]

Data Update for Paxton, MA April, 2005 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for April, 2005 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per the WSG84

Massachusetts at Amherst, University of

364

Data Update for Paxton, MA October, 2005  

E-Print Network [OSTI]

Data Update for Paxton, MA October, 2005 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for October, 2005 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

365

Data Update for Paxton, MA August, 2005  

E-Print Network [OSTI]

Data Update for Paxton, MA August, 2005 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for August, 2005 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

366

Data Update for Paxton, MA September, 2005  

E-Print Network [OSTI]

Data Update for Paxton, MA September, 2005 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for September, 2005 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

367

Data Update for Paxton, MA April, 2006  

E-Print Network [OSTI]

Data Update for Paxton, MA April, 2006 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for April, 2006 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per the WSG84

Massachusetts at Amherst, University of

368

Data Update for Paxton, MA October, 2006  

E-Print Network [OSTI]

Data Update for Paxton, MA October, 2006 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for October, 2006 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

369

Data Update for Paxton, MA Prepared for  

E-Print Network [OSTI]

Data Update for Paxton, MA May, 2005 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for May, 2005 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per the WSG84

Massachusetts at Amherst, University of

370

Data Update for Paxton, MA November, 2004  

E-Print Network [OSTI]

Data Update for Paxton, MA November, 2004 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for November, 2004 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

371

Data Update for Paxton, MA February, 2006  

E-Print Network [OSTI]

Data Update for Paxton, MA February, 2006 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for February, 2006 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

372

Data Update for Blandford, MA October 2006  

E-Print Network [OSTI]

Data Update for Blandford, MA October 2006 Prepared for Massachusetts Technology Collaborative 75 North Drive, Westborough, MA 01581 By Matthew Lackner Monthly Data Summary for October 2006 This update summarizes the monthly data results for the Blandford monitoring site in Blandford, MA, at 42.223 N, 72

Massachusetts at Amherst, University of

373

Data Update for Paxton, MA March, 2006  

E-Print Network [OSTI]

Data Update for Paxton, MA March, 2006 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for March, 2006 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per the WSG84

Massachusetts at Amherst, University of

374

Data Update for Paxton, MA August, 2006  

E-Print Network [OSTI]

Data Update for Paxton, MA August, 2006 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for August, 2006 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

375

Data Update for Paxton, MA December, 2005  

E-Print Network [OSTI]

Data Update for Paxton, MA December, 2005 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for December, 2005 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

376

Data Update for Paxton, MA March, 2005  

E-Print Network [OSTI]

Data Update for Paxton, MA March, 2005 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for March, 2005 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per the WSG84

Massachusetts at Amherst, University of

377

Data Update for Blandford, MA November 2006  

E-Print Network [OSTI]

Data Update for Blandford, MA November 2006 Prepared for Massachusetts Technology Collaborative 75 North Drive, Westborough, MA 01581 By Matthew Lackner Monthly Data Summary for November 2006 This update summarizes the monthly data results for the Blandford monitoring site in Blandford, MA, at 42.223 N, 72

Massachusetts at Amherst, University of

378

Data Update for Paxton, MA Prepared for  

E-Print Network [OSTI]

Data Update for Paxton, MA July, 2005 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for July, 2005 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per the WSG84

Massachusetts at Amherst, University of

379

Data Update for Paxton, MA Prepared for  

E-Print Network [OSTI]

Data Update for Paxton, MA June, 2005 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for June, 2005 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per the WSG84

Massachusetts at Amherst, University of

380

Data Update for Paxton, MA September, 2004  

E-Print Network [OSTI]

Data Update for Paxton, MA September, 2004 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for September, 2004 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Data Update for Paxton, MA Prepared for  

E-Print Network [OSTI]

Data Update for Paxton, MA July, 2006 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for July, 2006 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per the WSG84

Massachusetts at Amherst, University of

382

Data Update for Paxton, MA January, 2005  

E-Print Network [OSTI]

Data Update for Paxton, MA January, 2005 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for January, 2005 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

383

Data Update for Paxton, MA November, 2005  

E-Print Network [OSTI]

Data Update for Paxton, MA November, 2005 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for November, 2005 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

384

Data Update for Paxton, MA December, 2004  

E-Print Network [OSTI]

Data Update for Paxton, MA December, 2004 Prepared for Massachusetts Technology Collaborative, 75 North Drive, Westborough, MA 01581 By Kai Wu Monthly Data Summary for December, 2004 This update summarizes the monthly data results for the Paxton MA monitoring site at 42-18-11.6 N, 71-53-50.9 W per

Massachusetts at Amherst, University of

385

BELIEF REVISION AND UPDATE a dissertation  

E-Print Network [OSTI]

computational problems (chapters 5 and 6). A review of some of the most important proposals on revisionBELIEF REVISION AND UPDATE a dissertation submitted to the department of philosophy. In this study we focus on two of them, revision and update. For each of them, we attempt to ground them

del Val, Alvaro

386

nuclear power Update of the mit 2003  

E-Print Network [OSTI]

#12;Future of nuclear power Update of the mit 2003 PROFESSOR JOHN M.DEUTCH Institute Professor of Technology. All rights reserved. #12;Update of the MIT 2003 Future of Nuclear Power Study 3 In 2003 a group of MIT faculty issued a study on The Future of Nuclear Power.1 The study was motivated by growing concern

Reuter, Martin

387

Graduate School of Education Assessment Update  

E-Print Network [OSTI]

Graduate School of Education Assessment Update 2009 State of the School September 23, 2009 #12 communities' lifelong educational needs We updated our conceptual framework: #12;Graduate School of Education;Graduate School of Education Countdown to Accreditation Visit 38 days to go October 31­November 4 #12

388

History | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecemberGlossaryEnergy and CommerceofEnergyHistory

389

RMOTC - About Us - History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearch Welcome to theNewsCenter forQuality Assurance Is AQuietHistory

390

History | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area.Portal SolarAbout Energy.gov » HistorySeventy years

391

LANSCE | About | History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region serviceMission Statement Titan TargetInJupiterUser Los AlamosHistory

392

Plant maintenance and advanced reactors issue, 2008  

SciTech Connect (OSTI)

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.

Agnihotri, Newal (ed.)

2009-09-15T23:59:59.000Z

393

Maintenance implementation plan for B Plant  

SciTech Connect (OSTI)

The B Plant facility, is located in the 200 East Area at the Hanford Site in south-central Washington State. It consists of two major operating areas: the B Plant Canyon Building, and the Waste Encapsulation and Storage Facility (WESF). The B Plant was originally designed to chemically process spent nuclear fuels. After this initial mission was completed, the plant was modified to provide for the separation of strontium and cesium, individually, from the fission productwaste stream following plutonium and uranium recovery from irradiated reactor fuels in the Plutonium-Uranium Extraction Plant (PUREX). The recovered, purified, and concentrated strontium and cesium solutions were then transferred to the WESF for conversion to solid compounds, encapsulation, and interim storage. After strontium and cesium removal, the remaining waste was transferred from B Plant to tank farms. B Plantis an operating facility that is required to ensure safe storage And management of the WESF cesium and strontium capsules, as well as a substantial radiological inventory remaining in the plant from previous campaigns. There are currently no production activities at B Plant, but several operating systems are required to accomplish the current B Plant mission.B Plant receives and stores various chemicals from commercial suppliers for treatment of low-level waste generated at WESF and B Plant, generation of demineralized water, and conditioning of water used in heating, ventilation, and air conditioning units. This report describes the maintenance of B Plant, including personnel training and schedules.

Tritt, S.E.

1992-06-01T23:59:59.000Z

394

An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling  

E-Print Network [OSTI]

An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling Problem, an integrated ACO approach to solve joint production and preventive maintenance scheduling problem very effective solutions for this problem. Key words-- ACO, Production, Preventive maintenance

Paris-Sud XI, Université de

395

Predictive maintenance policy for a gradually deteriorating system subject to stress  

E-Print Network [OSTI]

of optimal maintenance strategies for improving system availability, preventing Preprint submitted and preventive. Preventive maintenance itself can be categorized into two classes: systematic preventive preventive maintenance policies based on the a priori statistical knowledge of the system lifetime [3]. CBM

Paris-Sud XI, Université de

396

Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using a Simulation-Based Approximate  

E-Print Network [OSTI]

Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using Dynamic Programming (ADP) approach for the optimization of Preventive Maintenance (PM) scheduling schedules. I. INTRODUCTION In semiconductor manufacturing systems, or fabs, pre- ventive maintenance (PM

Fernandez, Emmanuel

397

CBM processes are applicable to maintenance activities on complex systems. Southwest Research Institute  

E-Print Network [OSTI]

performance costs, and preventive/ scheduled maintenance replaces parts before the end of their useful life optimizes costs between preventive and corrective maintenance. Preventive Condition Number of FailuresCBM processes are applicable to maintenance activities on complex systems. Southwest Research

Chapman, Clark R.

398

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field  

E-Print Network [OSTI]

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field Kristin Group, Davis, CA, USA 4 Southern California Edison, Irwindale, CA, USA ABSTRACT HVAC maintenance utilities across the nation to include HVAC maintenance measures in energy efficiency programs

California at Davis, University of

399

If your codes run much slower than before the maintenance on...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

codes run much slower after the maintenance on 62514 If your codes hang or run much slower after the maintenance on 62514 June 27, 2014 (0 Comments) During the maintenance on...

400

updated slides: http://sideinfo.wikkii.com Rich Prior Knowledge  

E-Print Network [OSTI]

updated slides: http://sideinfo.wikkii.com Rich Prior Knowledge in Learning for NLP Gregory Druck, Kuzman Ganchev, João Graça updated slides: http://sideinfo.wikkii.com 1 1 #12;updated slides: http://sideinfo.wikkii.com Goal: Build a Statistical NLP System · ` 2 2 #12;updated slides: http://sideinfo.wikkii.com Goal: Build

Taskar, Ben

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Live Webinar on Better Buildings Challenge: Public-Sector Update  

Broader source: Energy.gov [DOE]

The Energy Department will present a live webinar titled "Better Buildings Challenge: Public-Sector Update."

402

Federal Utility Partnership Working Group Seminar: Washington Update  

Broader source: Energy.gov [DOE]

Presentation covers the Federal Utility Partnership Working Group Seminar: Washington Update on May 22, 2013.

403

Performance history over 10 years of super duplex stainless steel in flue gas desulfurization  

SciTech Connect (OSTI)

25 Cr duplex (austenitic/ferritic) stainless steel containing copper and nitrogen offers a cost effective solution to material selection for pollution control equipment. The properties of duplex stainless steel which make it suitable for this type of application are discussed and long term performance histories presented. It is concluded that high alloy duplex steel has an important role to play in the production of low maintenance reliable equipment for FGD and other pollution control systems.

Bendall, K.C. [Langley Alloys Ltd., Maidenhead (United Kingdom)

1996-08-01T23:59:59.000Z

404

History of Proton Linear Accelerators  

E-Print Network [OSTI]

much. References 1. Linear Accelerators, edited by P. M .at the 1986 Linear Accelerator Conference, SLAC, Stanford,HISTORY OF PROTON LINEAR ACCELERATORS Luis W. Alvarez TWO-

Alvarez, Luis W.

1987-01-01T23:59:59.000Z

405

FAciLity mAintenAnce College of Rural and Community Development  

E-Print Network [OSTI]

maintenance trends and developing strate- gies for future maintenance needs. Occupational endorsement Program--Troubleshooting HVAC Systems......................................2 CTT F151--Introduction to Plumbing Tools

Hartman, Chris

406

E-Print Network 3.0 - agreement maintenance based Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Computer Technologies and Information Sciences 51 Proposed Program: Reliability-Centered Maintenance (RCM) for the High Flux Isotope Reactor Summary: -Centered Maintenance...

407

E-Print Network 3.0 - anti-psychotic maintenance medication Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Software... Safety and Security Neural networks IVARA www.ivara.com Reliability centered maintenance solutions... maintenance solutions RCM toolkit (report generation)...

408

E-Print Network 3.0 - alternative telomere maintenance Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: plays a role in telomere maintenance. To investigate the possibility that ORC bound to telo- mere... to varying extents in cells with different telomere-maintenance...

409

E-Print Network 3.0 - aircraft maintenance Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for the U.S. Army Logistics Air Fleet Summary: capacity, airfield landing capability, maximum flight range of aircraft, maintenance requirement... mandated maintenance...

410

History of the Caribbean in a Global Perspective History 303  

E-Print Network [OSTI]

1 History of the Caribbean in a Global Perspective History 303 Consider Resources Primary Resources By Region British Caribbean Define Your Topic Identify the main concepts in your topic and come up background information (see below). When searching for items with Caribbean content, try alternate keywords

Abolmaesumi, Purang

411

Los Alamos Site Office Nuclear Maintenance Management Program...  

Office of Environmental Management (EM)

WCRR Monthly Diesel Generator PM, dated 04082011 WI 06.01 Attachment A, JRF-11-06 Preventive Maintenance Cancellation, dated 4122011 WI 06.01 Attachment A, JRF-11-09...

412

FEMP Offers New Training on Photovoltaic Operations and Maintenance...  

Broader source: Energy.gov (indexed) [DOE]

The seminar will cover operations and maintenance (O&M) best practices for photovoltaic (PV) systems of 100 kW or less, including planning for a PV O&M scope of work and...

413

Long-Term Surveillance Operations and Maintenance Fiscal Year...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that includes objectives published in the 2011-2020...

414

Multi-canister overpack operations and maintenance manual  

SciTech Connect (OSTI)

This manual provides general operating and maintenance instructions for the Multi-Canister Overpack. Procedure outlines included are conceptual in nature and will be modified, expanded, and refined during preparation of detailed operating procedures.

PIERCE, S.R.

1999-06-23T23:59:59.000Z

415

Pre-conceptual Design Assessment of DEMO Remote Maintenance  

E-Print Network [OSTI]

EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/13, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally ...

Loving, A; Sykes, N; Iglesias, D; Coleman, M; Thomas, J; Harman, J; Fischer, U; Sanz, J; Siuko, M; Mittwollen, M; others,

2013-01-01T23:59:59.000Z

416

Method and computer program product for maintenance and modernization backlogging  

DOE Patents [OSTI]

According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

2013-02-19T23:59:59.000Z

417

Gas Turbine Technology, Part B: Components, Operations and Maintenance  

E-Print Network [OSTI]

This paper builds on Part A and discusses the hardware involved in gas turbines as well as operations and maintenance aspects pertinent to cogeneration plants. Different categories of gas turbines are reviewed such as heavy duty aeroderivative...

Meher-Homji, C. B.; Focke, A. B.

418

Job Maintenance and Capital Development Fund (North Carolina)  

Broader source: Energy.gov [DOE]

The Job Maintenance and Capital Development Fund provides annual grants to businesses which are located in Development Tier I counties. The Fund is intended to encourage the retention of...

419

Maintenance Implementation Plan for B Plant. Revision 1  

SciTech Connect (OSTI)

The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ``Nuclear Facilities`` (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation.

Tritt, S.E.

1993-04-01T23:59:59.000Z

420

Technical Insights for Saltstone PA Maintenance  

SciTech Connect (OSTI)

The Cementitious Barriers Partnership (CBP) is a collaborative program sponsored by the US DOE Office of Waste Processing. The objective of the CBP is to develop a set of computational tools to improve understanding and prediction of the long-term structural, hydraulic, and chemical performance of cementitious barriers and waste forms used in nuclear applications. CBP tools are expected to better characterize and reduce the uncertainties of current methodologies for assessing cementitious barrier performance and increase the consistency and transparency of the assessment process, as the five-year program progresses. In September 2009, entering its second year of funded effort, the CBP sought opportunities to provide near-term tangible support to DOE Performance Assessments (PAs). The Savannah River Saltstone Disposal Facility (SDF) was selected for the initial PA support effort because (1) cementitious waste forms and barriers play a prominent role in the performance of the facility, (2) certain important long-term behaviors of cementitious materials composing the facility are uncertain, (3) review of the SDF PA by external stakeholders is ongoing, and (4) the DOE contractor responsible for the SDF PA is open to receiving technical assistance from the CBP. A review of the current (SRR Closure & Waste Disposal Authority 2009) and prior Saltstone PAs (e.g., Cook et al. 2005) suggested five potential opportunities for improving predictions. The candidate topics considered were (1) concrete degradation from external sulfate attack, (2) impact of atmospheric exposure to concrete and grout before closure, such as accelerated slag and Tc-99 oxidation, (3) mechanistic prediction of geochemical conditions, (4) concrete degradation from rebar corrosion due to carbonation, and (5) early age cracking from drying and/or thermal shrinkage. The candidate topics were down-selected considering the feasibility of addressing each issue within approximately six months, and compatibility with existing CBP expertise and already-planned activities. Based on these criteria, the five original topics were down-selected to two: external sulfate attack and mechanistic geochemical prediction. For each of the selected topics, the CBP communicated with the PA analysts and subject matter experts at Savannah River to acquire input data specific to the Saltstone facility and related laboratory experiments. Simulations and analyses were performed for both topics using STADIUM (SIMCO 2008), LeachXS/ORCHESTRA (ECN 2007, Meeussen 2003), and other software tools. These supplemental CBP analyses produced valuable technical insights that can be used to strengthen the Saltstone PA using the ongoing PA maintenance process. This report in part summarizes key information gleaned from more comprehensive documents prepared by Sarkar et al. (2010), Samson (2010), and Sarkar (2010).

Flach, G.; Sarkar, S.; Mahadevan, S.; Kosson, D.

2011-07-20T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3  

SciTech Connect (OSTI)

This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP`s current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes.

Meldrom, C.A.

1996-03-01T23:59:59.000Z

422

Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2  

SciTech Connect (OSTI)

This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or documented ? Provides instructions for implementing annual S&M inspections and activities The following facilities that were included in Revision 1 of this plan have reached final disposition and are no longer in the S&M program: ? Reactor Maintenance, Assembly, and Disassembly Facility, Building 25-3110 ? Test Cell A Facility, Building 25-3113 ? TCC Facility, Building 25-3210 ? Pluto Disassembly Facility, Building 26-2201 ? Super Kukla Facility, Building 27-5400

Poderis, Reed J. [NSTec] [NSTec; King, Rebecca A. [NSTec] [NSTec

2013-09-30T23:59:59.000Z

423

Updating MIT's cost estimation model for shipbuilding  

E-Print Network [OSTI]

This thesis project will update the MIT ship cost estimation model by combining the two existing models (the Basic Military Training School (BMTS) Cost Model and the MIT Math Model) in order to develop a program that can ...

Smith, Matthew B., Lieutenant, junior grade

2008-01-01T23:59:59.000Z

424

Appendix DATA Attachment A: WIPP Borehole Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Appendix DATA-2014 Attachment A: WIPP Borehole Update Table of Contents DATA-A-1.0 WIPP Boreholes...

425

Office Lighting: Title 24 & Technology Update  

E-Print Network [OSTI]

Office Lighting: Title 24 & Technology Update Kelly Cunningham Outreach Director kcunning@ucdavis.edu California Lighting Technology Center, UC Davis RESEARCH . INNOVATION . PARTNERSHIP Supporting compliance apply the Title 24 Building Energy Efficiency Standards code requirements specific to lighting

California at Davis, University of

426

Purdue Land Use Update March 1, 2010  

E-Print Network [OSTI]

and research (DEAD) · HB 1265 - Oil, gas, and coal bed methane property. (ALIVE) · SB 177 - Indiana Historic state parks and reservoirs (DEAD) IDEM is working to update the CAFO/CFO rules, in part because EPA has

427

Overview of Governor's Biofuels Coalition and Updates  

Broader source: Energy.gov [DOE]

At the August 7, 2008 quarterly joint Web conference of DOE's Biomass and Clean Cities programs, Stacey Simms (Colorado Governor's Energy Office) provided an update on Biofuels in Colorado.

428

Superconducting Partnership with Readiness Review Update  

E-Print Network [OSTI]

1 Superconducting Partnership with Industry: Readiness Review Update Mike Gouge, ORNL Steve Ashworth, LANL Paul Bakke, DOE-Golden DOE 2004 Superconductivity Peer Review July 27-29, 2004 #12;2 SPI

429

Updated 11.20.14 Johnson Center  

E-Print Network [OSTI]

Updated 11.20.14 Johnson Center Electronic Sign Board Request What may be posted: · Messages must of this form and return it to: Johnson Center Information Desk, MSN: 1C4 PLEASE PRINT CLEARLY: Your name

Lien, Jyh-Ming

430

Biodiesel ASTM Update and Future Technical Needs  

Broader source: Energy.gov (indexed) [DOE]

ASTM Update and Future Technical Needs Steve Howell Technical Director National Biodiesel Board ASTM Current Status ASTM D6751 is the approved standard for B100 for blending up to...

431

PROGRAMME GROUP RESEARCH UPDATE: Biodiversity indicators &  

E-Print Network [OSTI]

1 PROGRAMME GROUP RESEARCH UPDATE: Biodiversity indicators & knowledge management programme group Introduction Duncan Ray The programme group Biodiversity Indicators and Knowledge Management (BIKM) was established by the merger of the Biodiversity Indicators & Evaluation Programme and the Decision Support

432

MA 266 Review Topics - Exam # 2 (updated)  

E-Print Network [OSTI]

Page 1. Spring 2012. MA 266. Review Topics - Exam # 2 (updated) ..... and using a table of Laplace transforms (see table on page 317) and using linearity : L{f(t)...

2012-04-23T23:59:59.000Z

433

NATIONAL MUSEUM OF NATURAL HISTORY  

E-Print Network [OSTI]

NATIONAL MUSEUM OF NATURAL HISTORY MUSEUM REPORT 2009 ­ 2010 @ 100 | PAST, PRESENT & FUTURE #12;NatioNal MuseuM of NatUral History @ 100 | Past, PreseNt & future on March 17, 1910, our doors opened of amazing advances, and the Museum's accomplishments have been no less significant. in our first century, we

Mathis, Wayne N.

434

Environmental Regulatory Update Table, December 1989  

SciTech Connect (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlbert, L.M.; Langston, M.E. (Tennessee Univ., Knoxville, TN (USA)); Nikbakht, A.; Salk, M.S. (Oak Ridge National Lab., TN (USA))

1990-01-01T23:59:59.000Z

435

Environmental regulatory update table, March 1989  

SciTech Connect (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

1989-04-01T23:59:59.000Z

436

Environmental Regulatory Update Table, April 1989  

SciTech Connect (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

1989-05-01T23:59:59.000Z

437

Environmental Regulatory Update Table, October 1991  

SciTech Connect (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

1991-11-01T23:59:59.000Z

438

Environmental Regulatory Update Table, November 1990  

SciTech Connect (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Hawkins, G.T.; Houlberg, L.M.; Noghrei-Nikbakht, P.A.; Salk, M.S.

1990-12-01T23:59:59.000Z

439

Environmental regulatory update table, July 1991  

SciTech Connect (OSTI)

This Environmental Regulatory Update Table (July 1991) provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

1991-08-01T23:59:59.000Z

440

Environmental Regulatory Update Table, November 1991  

SciTech Connect (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

1991-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Environmental Regulatory Update Table, September 1991  

SciTech Connect (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

1991-10-01T23:59:59.000Z

442

Environmental Regulatory Update Table, December 1991  

SciTech Connect (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

1992-01-01T23:59:59.000Z

443

Environmental Regulatory Update Table, August 1991  

SciTech Connect (OSTI)

This Environmental Regulatory Update Table (August 1991) provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.M., Hawkins, G.T.; Salk, M.S.

1991-09-01T23:59:59.000Z

444

Applicability of Operational Research Techniques in CANDU Nuclear Plant Maintenance  

SciTech Connect (OSTI)

As previously reported at ICONE 6 in New Orleans, 1996, and ICONE 9 in Niece, 2001, the use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Innovative practices included greatly reducing Reliability Centered Maintenance (RCM) costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is being put in place. Further cost refinement of the station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data is being evaluated. A wide range of Operational Research (OR) literature was reviewed for implementation issues and several encouraging areas were found that will assist in the current effort of evaluating maintenance optimization techniques for nuclear power production. The road ahead is expected to consist first of resolving 25 years of data issues and preserving the data via appropriate knowledge system techniques while post war demographics permit experts to input into the system. Subsequent analytical techniques will emphasize total simplicity to obtain the requisite buy in from Corporate Executives who possibly are not trained in Operational Research. Case studies of containment airlock seal failures are used to illustrate the direct applicability of stochastic processes. Airlocks and transfer chambers were chosen as they have long been known as high maintenance items. Also, the very significant financial consequences of this type of failure will help to focus the attention of Senior Management on the effort. Despite substantial investment in research, improvement in the design of the seal material or configuration has not been achieved beyond the designs completed in the 1980's. Overall, the study showed excellent agreement of the relatively quick stochastic methods with the maintenance programs produced at great cost over years of trial and error. The pivotal role of expert opinion via experienced users/problem owners/maintenance engineers in all phases of the method and its application was noted and will be explored in subsequent efforts. The results are displayed via economic alternatives to more easily attract the attention of Maintenance Managers. Graphical overviews of the data demonstrated that substantial insight can be gained by simply organizing the data into statistically meaningful arrays such as histograms. The conclusions highlight several very positive avenues to evaluate at this particular juncture in time. (author)

Doyle, E. Kevin [Bruce Power LP, Box 4000B12, Tiverton, Ont., N0G2T0 (Canada)

2002-07-01T23:59:59.000Z

445

Home Maintenance and Repair Owning a home is a major responsibility.  

E-Print Network [OSTI]

maintenance is conducted. Regular, preventive maintenance can pay off in peace of mind, utility cost savings, routine maintenance helps to prolong the life of the home and may prevent the need for major repairs of Benjamin Franklin, "An ounce of prevention is worth a pound of cure." Regular, routine maintenance enhances

446

Single-machine scheduling with periodic and exible periodic maintenance to minimize maximum tardiness  

E-Print Network [OSTI]

periods often appear in industry due to a machine breakdown (stochastic) or preventive maintenance of machine unavailability. However, in some cases (e.g. preventive maintenance), the maintenance of a machineSingle-machine scheduling with periodic and exible periodic maintenance to minimize maximum

Paris-Sud XI, Université de

447

DYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni  

E-Print Network [OSTI]

. There are mainly two types of maintenance activities: the preventive maintenance, whose activities can be long termDYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni good performance with production means. Especially in maintenance services field where the different

Paris-Sud XI, Université de

448

Analysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H.  

E-Print Network [OSTI]

maintenance interval , and the critical failure rate given that no preventive maintenance is performed (asAnalysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H. SINTEF". The suggested modelling provides means to predict how maintenance tasks will affect the rate of critical

Langseth, Helge

449

Designing an on-line multimedia maintenance manual for a production environment  

E-Print Network [OSTI]

). It is a combination of design-out maintenance (DOM) and preventive maintenance. The focus of DOM is to improve36 Designing an on-line multimedia maintenance manual for a production environment W.P. Brinkman, V.P. Buil, R. Cullen1 , R. Gobits2 and F.L. van Nes e-mail: w.p.brinkman@tue.nl Abstract Maintenance

Brinkman, Willem-Paul

450

Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b,  

E-Print Network [OSTI]

Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b, , Sandra Preventive maintenance a b s t r a c t Today, many industrial companies must face problems raised to make predictive maintenance to prevent a serious breakdown. In addition, the corrective maintenance

Paris-Sud XI, Université de

451

April 2013 UpdateFinance Information System UPDATES TO FIS APRIL 2013  

E-Print Network [OSTI]

1 April 2013 UpdateFinance Information System UPDATES TO FIS ­ APRIL 2013 The following functionality has been added to FIS: `Opt out' of paper budget statements Purchase Order number added be downloaded from new FIS, it is hoped that the paper budget statements may no longer be required. A link

Strathclyde, University of

452

Blandford_2008_MonthlyUpdate_May.doc Data Update for Blandford, MA  

E-Print Network [OSTI]

at http://www.ceere.org/rerl/rerl_resourcedata.html. #12;Data Summary Statistics A summary of the data://www.ceere.org/rerl/rerl_resourcedata.html. Data Recovery All raw wind data are subjected to a series of tests and filters to identify dataBlandford_2008_MonthlyUpdate_May.doc Data Update for Blandford, MA May, 2008 Prepared

Massachusetts at Amherst, University of

453

Blandford_2008_MonthlyUpdate_April.doc Data Update for Blandford, MA  

E-Print Network [OSTI]

at http://www.ceere.org/rerl/rerl_resourcedata.html. #12;Data Summary Statistics A summary of the data://www.ceere.org/rerl/rerl_resourcedata.html. Data Recovery All raw wind data are subjected to a series of tests and filters to identify dataBlandford_2008_MonthlyUpdate_April.doc Data Update for Blandford, MA April, 2008 Prepared

Massachusetts at Amherst, University of

454

Blandford_2008_MonthlyUpdate_July.doc Data Update for Blandford, MA  

E-Print Network [OSTI]

at http://www.ceere.org/rerl/rerl_resourcedata.html. #12;Data Summary Statistics A summary of the data://www.ceere.org/rerl/rerl_resourcedata.html. Data Recovery All raw wind data are subjected to a series of tests and filters to identify dataBlandford_2008_MonthlyUpdate_July.doc Data Update for Blandford, MA July, 2008 Prepared

Massachusetts at Amherst, University of

455

Blandford_2007_MonthlyUpdate_July.doc Data Update for Blandford, MA  

E-Print Network [OSTI]

Summary Statistics A summary of the data during the reporting period are included in the following table://www.ceere.org/rerl/rerl_resourcedata.html. Data Recovery All raw wind data are subjected to a series of tests and filters to identify dataBlandford_2007_MonthlyUpdate_July.doc Data Update for Blandford, MA July, 2007 Prepared

Massachusetts at Amherst, University of

456

Blandford_2008_MonthlyUpdate_June.doc Data Update for Blandford, MA  

E-Print Network [OSTI]

at http://www.ceere.org/rerl/rerl_resourcedata.html. #12;Data Summary Statistics A summary of the data://www.ceere.org/rerl/rerl_resourcedata.html. Data Recovery All raw wind data are subjected to a series of tests and filters to identify dataBlandford_2008_MonthlyUpdate_June.doc Data Update for Blandford, MA June, 2008 Prepared

Massachusetts at Amherst, University of

457

Revolutionizing history education : using augmented reality games to teach histories  

E-Print Network [OSTI]

In an ever-changing present of multiple truths and reconfigured histories, people need to be critical thinkers. Research has suggested the potential for using augmented reality (AR) games- location-based games that use ...

Schrier, Karen L

2005-01-01T23:59:59.000Z

458

Decontamination and decommissioning surveillance and maintenance report for FY 1991  

SciTech Connect (OSTI)

The Decontamination and Decommissioning (D D) Program has three distinct phases: (1) surveillance and maintenance (S M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D D is devoted to S M at each of the sites. Our S M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

Not Available

1991-12-01T23:59:59.000Z

459

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

460

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

This construction, refurbishment and maintenance guide identifies the main sustainability factors that need to be considered during the design, refurbishment, construction or ongoing maintenance of buildings on our  

E-Print Network [OSTI]

1 This construction, refurbishment and maintenance guide identifies the main sustainability factors that need to be considered during the design, refurbishment, construction or ongoing maintenance or manage the refurbishment, construction or ongoing maintenance of buildings on behalf of the College. We

Sheldon, Nathan D.

462

History Publications | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehicles »Exchange Visitors History Publications History Publications

463

Gap Assessment (FY 13 Update)  

SciTech Connect (OSTI)

To help guide its future data collection efforts, The DOE GTO funded a data gap analysis in FY2012 to identify high potential hydrothermal areas where critical data are needed. This analysis was updated in FY2013 and the resulting datasets are represented by this metadata. The original process was published in FY 2012 and is available here: https://pangea.stanford.edu/ERE/db/GeoConf/papers/SGW/2013/Esposito.pdf Though there are many types of data that can be used for hydrothermal exploration, five types of exploration data were targeted for this analysis. These data types were selected for their regional reconnaissance potential, and include many of the primary exploration techniques currently used by the geothermal industry. The data types include: 1. well data 2. geologic maps 3. fault maps 4. geochemistry data 5. geophysical data To determine data coverage, metadata for exploration data (including data type, data status, and coverage information) were collected and catalogued from nodes on the National Geothermal Data System (NGDS). It is the intention of this analysis that the data be updated from this source in a semi-automated fashion as new datasets are added to the NGDS nodes. In addition to this upload, an online tool was developed to allow all geothermal data providers to access this assessment and to directly add metadata themselves and view the results of the analysis via maps of data coverage in Geothermal Prospector (http://maps.nrel.gov/gt_prospector). A grid of the contiguous U.S. was created with 88,000 10-km by 10-km grid cells, and each cell was populated with the status of data availability corresponding to the five data types. Using these five data coverage maps and the USGS Resource Potential Map, sites were identified for future data collection efforts. These sites signify both that the USGS has indicated high favorability of occurrence of geothermal resources and that data gaps exist. The uploaded data are contained in two data files for each data category. The first file contains the grid and is in the SHP file format (shape file.) Each populated grid cell represents a 10k area within which data is known to exist. The second file is a CSV (comma separated value) file that contains all of the individual layers that intersected with the grid. This CSV can be joined with the map to retrieve a list of datasets that are available at any given site. The attributes in the CSV include: 1. grid_id : The id of the grid cell that the data intersects with 2. title: This represents the name of the WFS service that intersected with this grid cell 3. abstract: This represents the description of the WFS service that intersected with this grid cell 4. gap_type: This represents the category of data availability that these data fall within. As the current processing is pulling data from NGDS, this category universally represents data that are available in the NGDS and are ready for acquisition for analytic purposes. 5. proprietary_type: Whether the data are considered proprietary 6. service_type: The type of service 7. base_url: The service URL

Getman, Dan

2013-09-30T23:59:59.000Z

464

Interagency Sustainability Working Group: Update Report; December 2009, Federal Energy Management Program (FEMP) (Brochure)  

SciTech Connect (OSTI)

December 2009 update report offered by the Interagency Sustainability Working Group (ISWG). This report is updated bi-annually.

Not Available

2009-12-01T23:59:59.000Z

465

Art History Adjunct Manual Department of Art & Art History, Hunter College, CUNY Art History Adjunct Manual Department of Art & Art History, Hunter College, CUNY  

E-Print Network [OSTI]

Art History Adjunct Manual Manual Department of Art & Art History and in your classes may be artists or would-be artists, practicing in a wide variety

Qiu, Weigang

466

updated 10/08/10 seo5 Graduate Student Activities  

E-Print Network [OSTI]

updated 10/08/10 seo5 Graduate Student Activities Biomedical Graduate Student. Coordinator 368.3431 Cdy5@case.edu BRB 7 th #12;updated 10/08/10 seo5 Molecular Medicine Contact

Yang, Sichun

467

National Solar Radiation Database 1991-2005 Update: User's Manual  

SciTech Connect (OSTI)

This manual describes how to obtain and interpret the data products from the updated 1991-2005 National Solar Radiation Database (NSRDB). This is an update of the original 1961-1990 NSRDB released in 1992.

Wilcox, S.

2007-04-01T23:59:59.000Z

468

Rebuild America partner update, November--December 1998  

SciTech Connect (OSTI)

This issue of the update includes articles on retrofitting Duke University facilities, energy efficiency updates to buildings in Portland, Oregon, Salisbury, North Carolina, Hawaii, Roanoke-Chowan, Virginia, and energy savings centered designs for lighting systems.

NONE

1998-11-01T23:59:59.000Z

469

Renewable, Green LNG: Update on the World's Largest Landill Gass...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Renewable, Green LNG: Update on the World's Largest Landill Gass to LNG Plant Renewable, Green LNG: Update on the World's Largest Landill Gass to LNG Plant Presentation at the...

470

Policy Flash 2013-36 Update to Congressional Notifications -...  

Office of Environmental Management (EM)

Policy Flash 2013-36 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Policy Flash 2013-36 Update to...

471

Updated Capital Cost Estimates for Utility Scale Electricity  

E-Print Network [OSTI]

Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants April 2013 Information Administration | Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants ii for Utility Scale Electricity Generating Plants ii Contents Introduction

472

EIS-0501: FERC Project Update | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

FERC Project Update EIS-0501: FERC Project Update Golden Pass LNG Export and Pipeline Project, Texas and Louisiana After conducting scoping for an EA for the proposed Golden Pass...

473

FEMP (Federal Energy Management Program) Update, Spring 1989  

SciTech Connect (OSTI)

The FEMP Update, published quarterly by the Federal Energy Management Program (FEMP), provides information that will assist federal managers in their energy management responsibilities. The Update is distributed primarily to federal facility and energy management personnel.

Not Available

1989-04-01T23:59:59.000Z

474

Vogtle 4th Quarter 2012 Construction Update | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Vogtle 4th Quarter 2012 Construction Update Vogtle 4th Quarter 2012 Construction Update Addthis See the progress Southern Company is making on Vogtle 3&4 construction, the nation's...

475

Clean coal technology programs: program update 2006  

SciTech Connect (OSTI)

The purpose of the Clean Coal Technology Programs: Program Update 2006 is to provide an updated status of the DOE commercial-scale demonstrations of clean coal technologies (CCTs). These demonstrations are performed under the Clean Coal Technology Demonstration Program (CCTDP), the Power Plant Improvement Initiative (PPII) and the Clean Coal Power Initiative (CCPI). Program Update 2006 provides 1) a discussion of the role of clean coal technology demonstrations in improving the nation's energy security and reliability, while protecting the environment using the nation's most abundant energy resource - coal; 2) a summary of the funding and costs of the demonstrations; and 3) an overview of the technologies being demonstrated, with fact sheets for demonstration projects that are active, recently completed, withdrawn or ended, including status as of June 30 2006. 4 apps.

NONE

2006-09-15T23:59:59.000Z

476

Clean Coal Technology Programs: Program Update 2009  

SciTech Connect (OSTI)

The purpose of the Clean Coal Technology Programs: Program Update 2009 is to provide an updated status of the U.S. Department of Energy (DOE) commercial-scale demonstrations of clean coal technologies (CCT). These demonstrations have been performed under the Clean Coal Technology Demonstration Program (CCTDP), the Power Plant Improvement Initiative (PPII), and the Clean Coal Power Initiative (CCPI). Program Update 2009 provides: (1) a discussion of the role of clean coal technology demonstrations in improving the nations energy security and reliability, while protecting the environment using the nations most abundant energy resourcecoal; (2) a summary of the funding and costs of the demonstrations; and (3) an overview of the technologies being demonstrated, along with fact sheets for projects that are active, recently completed, or recently discontinued.

None

2009-10-01T23:59:59.000Z

477

US Releases Updated Plutonium Inventory Report | National Nuclear...  

National Nuclear Security Administration (NNSA)

Releases Updated Plutonium Inventory Report | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

478

U-060: Security update: Hotfix available for ColdFusion  

Broader source: Energy.gov [DOE]

Vulnerabilities have been identified in ColdFusion 9.0.1 and earlier versions for Windows, Macintosh and UNIX. These vulnerabilities could lead to a cross-site scripting attack. Adobe categorizes this as an important update and recommends that users apply the latest update for their product installation.This update resolves a cross-site scripting vulnerability in cfform tag (CVE-2011-2463). This update resolves a cross-site scripting vulnerability in RDS (CVE-2011-4368).

479

Updated NGNP Fuel Acquisition Strategy  

SciTech Connect (OSTI)

A Next Generation Nuclear Plant (NGNP) fuel acquisition strategy was first established in 2007. In that report, a detailed technical assessment of potential fuel vendors for the first core of NGNP was conducted by an independent group of international experts based on input from the three major reactor vendor teams. Part of the assessment included an evaluation of the credibility of each option, along with a cost and schedule to implement each strategy compared with the schedule and throughput needs of the NGNP project. While credible options were identified based on the conditions in place at the time, many changes in the assumptions underlying the strategy and in externalities that have occurred in the interim requiring that the options be re-evaluated. This document presents an update to that strategy based on current capabilities for fuel fabrication as well as fuel performance and qualification testing worldwide. In light of the recent Pebble Bed Modular Reactor (PBMR) project closure, the Advanced Gas Reactor (AGR) fuel development and qualification program needs to support both pebble and prismatic options under the NGNP project. A number of assumptions were established that formed a context for the evaluation. Of these, the most important are: Based on logistics associated with the on-going engineering design activities, vendor teams would start preliminary design in October 2012 and complete in May 2014. A decision on reactor type will be made following preliminary design, with the decision process assumed to be completed in January 2015. Thus, no fuel decision (pebble or prismatic) will be made in the near term. Activities necessary for both pebble and prismatic fuel qualification will be conducted in parallel until a fuel form selection is made. As such, process development, fuel fabrication, irradiation, and testing for pebble and prismatic options should not negatively influence each other during the period prior to a decision on reactor type. Additional funding will be made available beginning in fiscal year (FY) 2012 to support pebble bed fuel fabrication process development and fuel testing while maintaining the prismatic fuel schedule. Options for fuel fabrication for prismatic and pebble bed were evaluated based on the credibility of each option, along with a cost and schedule to implement each strategy. The sole prismatic option is Babcock and Wilcox (B&W) producing uranium oxycarbide (UCO) tristructural-isotropic (TRISO) fuel particles in compacts. This option finishes in the middle of 2022 . Options for the pebble bed are Nuclear Fuel Industries (NFI) in Japan producing uranium dioxide (UO2) TRISO fuel particles, and/or B&W producing UCO or UO2 TRISO fuel particles. All pebble options finish in mid to late 2022.

David Petti; Tim Abram; Richard Hobbins; Jim Kendall

2010-12-01T23:59:59.000Z

480

CLARIFICATION: Incorporation of OFPC Manual and Document Updates Updated documents should be incorporated in to projects as follows  

E-Print Network [OSTI]

CLARIFICATION: Incorporation of OFPC Manual and Document Updates Updated documents should be incorporated in to projects as follows: Project Management Manual (PMM) and Construction Inspection Manual (CIM approved by senior project management, project managers shall require the design professional

O'Toole, Alice J.

Note: This page contains sample records for the topic "maintenance history updated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

INTEGRATED ENERGY POLICY REPORT UPDATE CALIFORNIA ENERGY COMMISSION  

E-Print Network [OSTI]

to California energy policy in the areas of renewable energy, alter- native transportation fuels2012 IEPR UPDATE INTEGRATED ENERGY POLICY REPORT UPDATE CALIFORNIA ENERGY COMMISSION EDMUND G. BROWN JR., GOVERNOR CEC-100 -2012- 001-CMF #12;i The 2012 Integrated Energy Policy Report Update

482

2008 Integrated Energy Policy report UPDATE Arnold Schwarzenegger, Governor  

E-Print Network [OSTI]

Integrated Energy Policy Reports.6. Key Words Renewables Portfolio Standard, Renewable Energy Transmission2008 Integrated Energy Policy report UPDATE Arnold Schwarzenegger, Governor #12;#12;2008 IEPR Energy Policy Report Update, CEC-100-2008-008-CMF. #12;2008 IEPR UPDATE This report is dedicated

483

Software Safety Tutorial Status Update 1 Software Safety Tutorial  

E-Print Network [OSTI]

Software Safety Tutorial Status Update 1 Software Safety Tutorial (Status Update) Jeff Tian, tian@engr.smu.edu CSE, SMU, Dallas, TX 75275 Topics · Project Overview · Software Safety Overview · Project Tasks/Schedule/Progress Jeff Tian August 31, 2007 #12;Software Safety Tutorial Status Update 2 What Is Software Safety

Tian, Jeff

484

Curriculum Vitae Updated: December 17, 2008 Medeiros 1 / 4  

E-Print Network [OSTI]

Curriculum Vitae Updated: December 17, 2008 Medeiros 1 / 4 Stephen Conroy Medeiros, P.E. CURRENT of Technology - Melbourne, Florida #12;Curriculum Vitae Updated: December 17, 2008 Medeiros 2 / 4 UNIVERSITY Falls, Ontario, Canada, July, 2002. #12;Curriculum Vitae Updated: December 17, 2008 Medeiros 3 / 4

Central Florida, University of

485

last updated 12/05/2013 Deliverable Quarter Due (Draft!)  

E-Print Network [OSTI]

Forecast Q3 2014 Draft Results of Flexibility and Balancing Analysis Q4 2014 Demand Forecast Updated Q4, forecasts and other inputs Ongoing Narratives on Power Planning Topics and Issues (RSAC) Identify Topics 2014 Load Forecast Updated Q4 2014 Conservation Supply Curves Updated Q4 2014 Conceptual Definition

486

Federal Research Update Webinar Wednesday October 31 Friday November 2  

E-Print Network [OSTI]

for Teaching and Learning, National Center for Education Research, Department of Education, on updates of EDFederal Research Update Webinar Wednesday October 31 ­ Friday November 2 Hosted by The Office will be provided. #12;Federal Research Update Webinar Monday October 29 ­ Friday November 2 Wednesday, October 31

Maryland, Baltimore County, University of

487

Updated 07/20/2012 Office of International Education  

E-Print Network [OSTI]

Updated 07/20/2012 Office of International Education International Student, Scholar databases to update your arrival information. Make sure your SEVIS record is up-to-date and in active all the databases time to update with your new information. Bring all your paperwork. When you go

Hall, Daniel

488

Distributed Construction and Maintenance of Bandwidth and Energy Efficient  

E-Print Network [OSTI]

wireless RF technology designed initially for cable replacement at indoor places, but also supports usageDistributed Construction and Maintenance of Bandwidth and Energy Efficient Bluetooth Scatternets on simulations, the paper also presents the improvements in bandwidth-efficiency and reduction in energy

Korpeoglu, Ibrahim

489

CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

490

CRAD, Maintenance- Los Alamos National Laboratory TA 55 SST Facility  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance program at the Los Alamos National Laboratory TA 55 SST Facility.

491

Joint Traffic Blocking and Routing under Network Failures and Maintenances  

E-Print Network [OSTI]

Joint Traffic Blocking and Routing under Network Failures and Maintenances Chao Liang ECE Dept paths. Therefore, it is important to design ingress traffic blocking and routing jointly to achieve a good balance between the two factors. Working towards this goal, we formulate a joint ingress blocking

Liu, Yong

492

CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

493

Winter Performance and Maintenance of Porous Asphalt Pavements  

E-Print Network [OSTI]

Concrete (HSG-B)Porous Asphalt (HSG-C) #12;Cold Climate Performance Results #12;12 Porous Asphalt SurfaceWinter Performance and Maintenance of Porous Asphalt Pavements Robert M. Roseen, Ph.D., P.E., D impacts for new development and reverse impacts in areas with redevelopment. #12;Porous Asphalt Design

494

Enhancing Building Performance Through More Responsive Maintenance System  

E-Print Network [OSTI]

forth). For example, installing a water heater needs a plumber and electrician to complete the job in a traditional maintenance system. With MST principle, this work order can be done by one technician instead of two. In this way work orders...

Alsudairi, A. A.

2012-01-01T23:59:59.000Z

495

The Facility The Propellants North Administrative and Maintenance  

E-Print Network [OSTI]

and Maintenance Facility Inside Propellants North is window glazing and framing from the iconic firing rooms with energy recovery technology · Highly insulated roof and walls · Lighting fixtures with smart lighting glazing and framing · Reclaimed and processed waste concrete from Kennedy's demolition projects

496

Constraint processing for optimal maintenance Daniel Frost and Rina Dechter  

E-Print Network [OSTI]

preventative maintenance of power generating units within a power plant. We show how these problems can be cast competitive CSP algorithms on the main- tenance scheduling benchmark. The authors thank the Electric Power of a CSP : : : : : : : : : : : : : : : : : : : : : : : : : : : 7 2.3 CSP Algorithms

Dechter, Rina

497

Periodic NDE for Bridge Maintenance Ralf W. Arndt  

E-Print Network [OSTI]

Periodic NDE for Bridge Maintenance Ralf W. Arndt NRC Research Associate U.S. Federal Highway Administration NDE Center 6300 Georgetown Pike McLean, VA 22101, USA ralf.arndt@fhwa.dot.gov Frank Jalinoos Program Manager U.S. Federal Highway Administration NDE Center 6300 Georgetown Pike McLean, VA 22101, USA

Huston, Dryver R.

498

Maintenance and Operations of Schools for Energy Efficiency  

E-Print Network [OSTI]

Maintenance and operations of schools with energy efficiency as a priority can reduce annual utility costs 3 to 30 percent. Most school districts do not have an organized plan for tracking energy usage or cost. Energy performance (e.g. Btu/ft^2-yr...

McClure, J. D.; Estes, J. M.

1986-01-01T23:59:59.000Z

499

REST Web Service Maintenance Through API Policy Enforcement  

E-Print Network [OSTI]

1 REST Web Service Maintenance Through API Policy Enforcement Hiranya Jayathilaka, Chandra Krintz 100% annual growth rate [2]. These APIs increasingly employ the REST (Representational State Transfer accessible to users via web application programming interfaces (web APIs) and cloud-based deployment

California at Santa Barbara, University of

500

Model 6000 Laser Controller Operation and Maintenance Manual  

E-Print Network [OSTI]

i Model 6000 Laser Controller Operation and Maintenance Manual #12;Corporate Headquarters Canada by improper use or failure to observe proper operating procedures per the product specification or operators 9002 by the British Standards Institution. #12;Limited Warranty Newport warrants that this product