Sample records for maintenance general site

  1. Hanford.gov Site Maintenance - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Hanford.gov will be undergoing scheduled upgrades and will be unavailable from 7:00 am Saturday, April 16th, 2016 until 5:00pm Sunday, April 17th, 2016. All Hanford.gov websites and web applications will be unavailable during this upgrade. Questions and inquiries regarding this maintenance outage please

  2. Site Transition Framework for Long-Term Surveillance and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Framework for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and ...

  3. Test Site Operations & Maintenance Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Site Operations & Maintenance Safety - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste

  4. TNRC 61 - General Provisions Use and Maintenance of Public Beaches...

    Open Energy Info (EERE)

    1 - General Provisions Use and Maintenance of Public Beaches Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: TNRC 61 - General...

  5. Site Transition Framework for Long-Term Surveillance and Maintenance

    Broader source: Energy.gov [DOE]

    The Site Transition Framework (STF) provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTS&...

  6. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  7. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  8. Washington Energy Facility Site Evalutation Council - Generalized...

    Open Energy Info (EERE)

    Reference LibraryAdd to library Chart: Washington Energy Facility Site Evalutation Council - Generalized Siting ProcessInfo GraphicMapChart Abstract Flowchart showing the...

  9. Site transition framework for long-term surveillance and maintenance

    SciTech Connect (OSTI)

    2014-04-01

    This document provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTSM) responsibilities. It is a tool to help facilitate a smooth transition from remediation to LTSM, providing a systematic process for affected parties to utilize in analyzing the baseline to understand and manage the actions from EM mission completion through a site’s transition into LTSM. The framework is not meant to provide an exhaustive list of the specific requirement and information that are needed. Sites will have unique considerations that may not be adequately addressed by this tool, and it is anticipated that a team comprised of the transferring and receiving organization will use judgment in utilizing this augmenting with other DOE guidance. However the framework should be followed to the extent possible at each site; and adapted to accommodate unique site-specific requirements, needs, and documents. Since the objective of the tool is facilitate better understanding of the conditions of the site and the actions required for transfer, the transition team utilizing the checklist is expected to consult with management of both the receiving and transferring organization to verify that major concerns are addressed. Ideally, this framework should be used as early in the remediation process as possible. Subsequent applications of the Site Transition Framework (STF) to the site should be conducted periodically and used to verify that all appropriate steps have been or will be taken to close-out the site and that actions by both organization are identified to transfer the site to LTSM. The requirements are provided herein.

  10. Rocky Flats Site, Colorado, Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013

    Office of Legacy Management (LM)

    Quarterly Report of Site Surveillance and Maintenance Activities Second Quarter Calendar Year 2015 October 2015 LMS/RFS/S13352 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-2nd Quarter CY 2015 October 2015 Doc. No. S13352 Page i Contents Abbreviations ................................................................................................................................. iv 1.0 Introduction

  11. Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2015

    Office of Legacy Management (LM)

    Colorado, Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2015 January 2016 LMS/RFS/S13687 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-3rd Quarter CY 2015 January 2016 Doc. No. S13687 Page i Contents Abbreviations ................................................................................................................................. iv 1.0

  12. Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013

    Office of Legacy Management (LM)

    3 January 2014 LMS/RFS/S11334 This page intentionally left blank LMS/RFS/S11334 Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013 January 2014 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-3rd Quarter CY 2013 January 2014 Doc. No. S11334 Page i Contents Abbreviations

  13. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    7 2.0 Site Operations and Maintenance 2.1 Annual Site Inspection The Site must be inspected annually for evidence of significant erosion and IC violations, in accordance with RFLMA Attachment 2, Sections 5.3.4 and 5.3.6. The 2015 inspection was conducted on March 17, 2015, and reported in the Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities, First Quarter Calendar Year 2015 (DOE 2015d). The inspection includes observations associated with the following condition

  14. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2011

    SciTech Connect (OSTI)

    2012-03-01

    This report summarizes the 2011 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi.

  15. PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE

    Broader source: Energy.gov [DOE]

    Carlsbard, NM - The effectiveness of the Waste Isolation Pilot Plant’s (WIPP) preventive maintenance program paid huge dividends late last month when an issue with a steel rope on the project’s waste conveyance was identified during a routine inspection.

  16. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    Flats Site, Colorado Calendar Year 2015 April 2016 LMS/RFS/S13696 This page intentionally left blank U.S. Department of Energy Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado April 2016 Doc. No. S13696 Page i Contents Abbreviations .................................................................................................................................xv Executive Summary

  17. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010

    SciTech Connect (OSTI)

    2011-03-01

    This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

  18. Maintenance at DOE Legacy Management Sites Weldon Spring Site LTS&M Plan U.S. Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Developing and Implementing Institutional Controls for Long-Term Surveillance and Maintenance at DOE Legacy Management Sites Weldon Spring Site LTS&M Plan U.S. Department of Energy Doc. No. S00790-1.0 December 2008 Page 2-22 Figure 2-4. MNA Groundwater Monitoring Locations January 2015 DOE/LM-1414 Guidance for Developing and Implementing Institutional Controls for Long-Term Surveillance and Maintenance at DOE Legacy Management Sites January 2015 The most recent and official controlled hard

  19. Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013

    Office of Legacy Management (LM)

    Third Quarter Calendar Year 2014 January 2015 LMS/RFS/S12555 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-3rd Quarter CY 2014 January 2015 Doc. No. S12555 Page i Contents Abbreviations ................................................................................................................................. iv 1.0 Introduction

  20. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012

    SciTech Connect (OSTI)

    2013-03-01

    This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate

  1. Overview of the Third Quarter 2014 Surveillance and Maintenance Report for the LM Rocky Flats Site

    Office of Legacy Management (LM)

    4 Surveillance and Maintenance Report for the LM Rocky Flats Site July-September 2014 Quarterly Monitoring and Reporting  Quarterly reports are required under the Rocky Flats Legacy Management Agreement (RFLMA) to document that the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) remedy continues to be protective * Primary goal is protection of surface water  Response action under the final remedy for Rocky Flats * Maintain two landfill covers * Maintain four

  2. Kansas City Site Office General Workforce Restructuring (2007...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Apply for Our Jobs Our Jobs Working at NNSA Blog Home Field Offices Welcome to the Kansas City Field Office Kansas City Site Office General Workforce Restructuring (2007)...

  3. General Atomics Hot Cell Facility, California, Site Fact Sheet

    Office of Legacy Management (LM)

    General Atomics Hot Cell Facility, California, Site. The U.S. Department of Energy Office of Legacy Management is responsible for maintaining records for this facility. Site Description and History The former General Atomics Hot Cell Facility was constructed in 1959 and operated until 1991. The site encompassed approximately 7,400 square feet of laboratory and remote operations cells. Licensed operations at the facility included receipt, handling, and shipment of radioactive materials; remote

  4. Overview of the Second Quarter 2011 Surveillance and Maintenance Report for the LM Rocky Flats Site

    Office of Legacy Management (LM)

    of the Second Quarter 2012 Surveillance and Maintenance Report for the LM Rocky Flats Site April-June 2012 Surface Water Monitoring and Operations 2 Second Quarter 2012 2 Pond Operations - Second Quarter 2012  Terminal Pond Discharges: * Valves at A-4, B-5, and C-2 were opened in 2011; all Terminal Ponds are now operated in a flow-through mode  Pond Levels: * As of June 30, 2012, the Terminal Ponds were holding approximately 5.0 MG (6.4 percent of capacity) 3 3 October 15, 2012, Pond

  5. Application of Probabilistic Performance Assessment Modeling for Optimization of Maintenance Studies for Low-Level Radioactive Waste Disposal Sites at the Nevada Test Site

    SciTech Connect (OSTI)

    Crowe, B.; Yucel, V.; Rawlinson, S.; Black, P.; Carilli, J.; DiSanza, F.

    2002-02-25

    The U.S. Department of Energy (DOE), National Nuclear Security Administration of the Nevada Operations Office (NNSA/NV) operates and maintains two active facilities on the Nevada Test Site (NTS) that dispose defense-generated low-level radioactive waste (LLW), mixed radioactive waste, and ''classified waste'' in shallow trenches and pits. The operation and maintenance of the LLW disposal sites are self-regulated by the DOE under DOE Order 435.1. This Order requires formal review of a performance assessment (PA) and composite analysis (CA; assessment of all interacting radiological sources) for each LLW disposal system followed by an active maintenance program that extends through and beyond the site closure program. The Nevada disposal facilities continue to receive NTS-generated LLW and defense-generated LLW from across the DOE complex. The PA/CAs for the sites have been conditionally approved and the facilities are now under a formal maintenance program that requires testing of conceptual models, quantifying and attempting to reduce uncertainty, and implementing confirmatory and long-term background monitoring, all leading to eventual closure of the disposal sites. To streamline and reduce the cost of the maintenance program, the NNSA/NV is converting the deterministic PA/CAs to probabilistic models using GoldSim, a probabilistic simulation computer code. The output of probabilistic models will provide expanded information supporting long-term decision objectives of the NTS disposal sites.

  6. PRIOR HAB ADVICE POINTS - STATE OF THE SITE MEETINGS GENERAL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, 2013 1 PRIOR HAB ADVICE POINTS - STATE OF THE SITE MEETINGS GENERAL * Seek Board collaboration and involvement early in the SOS scheduling and design process, to ensure adequate community and HAB membership support. * Develop and publish an SOS protocol that clearly addresses expected SOS meeting outcomes, methods of meeting evaluation, and the responsibilities of meeting participants. * Draft guidelines that promote the effective annual scheduling of future SOS meetings for the Hanford

  7. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    5 Table 105. 2015 Wetland Mitigation Credit at the Rocky Flats Site 3.2.11 Summary The Ecology Program at the Site conducts monitoring of the ecological resources to ensure regulatory compliance and to preserve, protect, and manage those resources. Proactive management of the natural resources is critical to the long-term sustainability of the ecosystems at the Site. Noxious weeds continue to be a priority, as does the revegetation of the COU. Data from 2015 documented the continuing

  8. EFSEC Generalized Siting Process Flowchart | Open Energy Information

    Open Energy Info (EERE)

    GraphicMapChart Author Washington State Energy Facility Site Evaluation Council Organization Washington State Energy Facility Site Evaluation Council Published...

  9. Evaluating, Migrating, and Consolidating Databases and Applications for Long-Term Surveillance and Maintenance Activities at the Rocky Flats Site

    SciTech Connect (OSTI)

    Surovchak, S.; Marutzky, S.; Thompson, B.; Miller, K.; Labonte, E.

    2006-07-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is assuming responsibilities for long-term surveillance and maintenance (LTS and M) activities at the Rocky Flats Environmental Technology Site (RFETS) during fiscal year 2006. During the transition, LM is consolidating databases and applications that support these various functions into a few applications which will streamline future management and retrieval of data. This paper discussed the process of evaluating, migrating, and consolidating these databases and applications for LTS and M activities and provides lessons learned that will benefit future transitions. (authors)

  10. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    29 3.0 Environmental Monitoring 3.1 Water Monitoring 3.1.1 Introduction This section presents data collected to satisfy water monitoring objectives implemented at the Site in accordance with RFLMA Attachment 2, "Legacy Management Requirements," Table 2, "Water Monitoring Locations and Sampling Criteria." The RFSOG provides a guidance framework in support of conducting LM activities, including monitoring, at the Site. This annual report focuses on data collected during CY 2015

  11. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    1.0 Introduction The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is responsible for implementing the final response action selected in the final Corrective Action Decision/Record of Decision for Rocky Flats Plant (USDOE) Peripheral Operable Unit and Central Operable Unit (CAD/ROD) (DOE 2006a) issued September 29, 2006, for the Rocky Flats Site, Colorado (Site). Prior to the CAD/ROD, cleanup and closure activities were completed in accordance with the requirements of the

  12. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    Site, Colorado April 2016 Doc. No. S13696 Page 37 3.1.2 Routine Monitoring 3.1.2.1 POC Monitoring This objective deals with monitoring surface water at the COU boundary in Woman and Walnut Creeks to demonstrate compliance with surface-water quality standards (Table 1 of RFLMA Attachment 2). Water-quality data at POCs can trigger reportable conditions under RFLMA when the applicable evaluation parameters are greater than the corresponding Table 1 values (see Appendix D). Surface water at the

  13. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    57 4.0 References 8 CCR 1206-2. "Rules Pertaining to the Administration and Enforcement of the Colorado Noxious Weed Act," Code of Colorado Regulations. Adrian, L. and H. Gorisch, 2002." Microbial transformation of chlorinated benzenes under anaerobic conditions," in Research in Microbiology 153, pp. 131-137; Elsevier, February 14. Carter, R.W., and J. Davidian, 1968. General Procedure for Gaging Streams: U.S. Geological Survey Techniques of Water-Resources Investigations,

  14. Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment, April 2011

    Office of Environmental Management (EM)

    Energy Laboratory: Las Conchas Fire Update Los Alamos National Laboratory: Las Conchas Fire Update June 29, 2011 - 10:33am Addthis Liisa O'Neill Liisa O'Neill Former New Media Specialist, Office of Public Affairs Many of you have asked for more information about the potential impact of the fire in New Mexico on the Energy Department's Los Alamos National Laboratory. We'd like to share the latest update from the lab below. You can also monitor the Laboratory's news site for the latest

  15. Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Amchitka, Alaska, Site

    SciTech Connect (OSTI)

    2008-09-01

    This Long-Term Surveillance and Maintenance Plan describes how the U.S. Department of Energy (DOE) intends to fulfill its mission to maintain protection of human health and the environment at the Amchitka, Alaska, Site1. Three underground nuclear tests were conducted on Amchitka Island. The U.S. Department of Defense, in conjunction with the U.S. Atomic Energy Commission (AEC), conducted the first nuclear test (Long Shot) to provide data that would improve the United States' capability of detecting underground nuclear explosions. The second nuclear test (Milrow) was a weapons-related test conducted by AEC as a means to study the feasibility of detonating a much larger device. The final nuclear test (Cannikin), the largest United States underground test, was a weapons-related test. Surface disturbances associated with these tests have been remediated. However, radioactivity remains deep below the surface, contained in and around the test cavities, for which no feasible remediation technology has been identified. In 2006, the groundwater model (Hassan et al. 2002) was updated using 2005 data collected by the Consortium for Risk Evaluation with Stakeholder Participation. Model simulation results indicate there is no breakthrough or seepage of radionuclides into the marine environment within 2,000 years. The Amchitka conceptual model is reasonable; the flow and transport simulation is based on the best available information and data. The simulation results are a quantitative prediction supported by the best available science and technology. This Long-Term Surveillance and Maintenance Plan is an additional step intended for the protection of human health and the environment. This plan may be modified from time to time in the future consistent with the mission to protect human health

  16. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    J. L. Smith

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS).

  17. Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the NTS

    SciTech Connect (OSTI)

    Vefa Yucel

    2007-01-03

    U.S. Department of Energy (DOE) Manual M 435.1-1 requires that performance assessments (PAs) and composite analyses (CAs) for low-level waste (LLW) disposal facilities be maintained by the field offices. This plan describes the activities performed to maintain the PA and the CA for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS). This plan supersedes the Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (DOE/NV/11718--491-REV 1, dated September 2002). The plan is based on U.S. Department of Energy (DOE) Order 435.1 (DOE, 1999a), DOE Manual M 435.1-1 (DOE, 1999b), the DOE M 435.1-1 Implementation Guide DOE G 435.1-1 (DOE, 1999c), and the Maintenance Guide for PAs and CAs (DOE, 1999d). The plan includes a current update on PA/CA documentation, a revised schedule, and a section on Quality Assurance.

  18. Web Maintenance

    Broader source: Energy.gov [DOE]

    EERE expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance:technical maintenanceandcontent maintenance....

  19. Oregon Department of Transportation - Maintenance and Operations...

    Open Energy Info (EERE)

    Maintenance and Operations Branch Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Department of Transportation - Maintenance and Operations...

  20. Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance

    Broader source: Energy.gov [DOE]

    Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance...

  1. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term ...

  2. Test Site Operations & Maintenance Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management ...

  3. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th...

  4. Top Operations and Maintenance (O&M) Efficiency Opportunities at DoD/Army Sites - A Guide for O&M/Energy Managers and Practitioners

    SciTech Connect (OSTI)

    Sullivan, Gregory P.; Dean, Jesse D.; Dixon, Douglas R.

    2007-05-25

    This report, sponsored the Army's Energy Engineering Analysis Program, provides the Operations and Maintenance (O&M) Energy manager and practitioner with useful information about the top O&M opportunities consistently found across the DoD/Army sector. The target is to help the DoD/Army sector develop a well-structured and organized O&M program.

  5. Director of Maintenance for USA Jet Airlines, Inc. | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration Director of Maintenance for USA Jet Airlines, Inc. Rick A. Wilson Rick Wilson July 2009 U.S. General Services Administration (GSA) Aviation Maintenance Professional of the Year Rick A. Wilson has received the U.S. General Services Administration (GSA) Aviation Maintenance Professional of the Year award. Wilson is the director of maintenance for USA Jet Airlines, Inc., in Albuquerque. He manages the maintenance activity of seven different fleet aircraft for the Office

  6. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance ... to the U.S. Department of Energy (DOE) for long-term surveillance and maintenance (LTS&M). ...

  7. General Resources - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Help 314 1st Ave W Seattle, WA 98119 (800) 255-9752 Washington State Department of Labor and Industries P. O. Box 44000 Olympia, WA 98504-4000 (800) 547-8367 toll free (360)...

  8. Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP

    Energy Savers [EERE]

    Sites | Department of Energy Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document summarizes radiological conditions at sites remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and transferred to the U.S. Department of Energy (DOE) for long-term surveillance and maintenance (LTS&M). Source document citations are presented. Most of these sites meet criteria for unrestricted use; a

  9. Thermography instruments for predictive maintenance

    SciTech Connect (OSTI)

    Palko, E.

    1993-08-12

    Thermography (infrared imaging, or IR scanning) is not only the most versatile predictive maintenance technology available today; it is, in general, the most cost-effective. Plant engineering can apply a virtually unlimited variety of predictive maintenance instruments, but all are restricted regarding the types of existing and incipient problems they can detect. Inplant applications of thermography, however, are truly limited only by the extent of the plant engineer's imagination. Here are ways that thermography can be used to fight downtime in plants, and factors to consider when selecting the best instrument for particular circumstances.

  10. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Department of Energy Framework for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and Maintenance PDF icon Site Transition Framework for Long-Term Surveillance and Maintenance More Documents & Publications Site Transition Framework for Long-Term Surveillance and Maintenance Site Transition Process Upon Cleanup Completion Long-Term Stewardship Study

    Framework Site

  11. Sorption testing and generalized composite surface complexation models for determining uranium sorption parameters at a proposed in-situ recovery site

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Johnson, Raymond H.; Truax, Ryan A.; Lankford, David A.; Stone, James J.

    2016-02-03

    Solid-phase iron concentrations and generalized composite surface complexation models were used to evaluate procedures in determining uranium sorption on oxidized aquifer material at a proposed U in situ recovery (ISR) site. At the proposed Dewey Burdock ISR site in South Dakota, USA, oxidized aquifer material occurs downgradient of the U ore zones. Solid-phase Fe concentrations did not explain our batch sorption test results,though total extracted Fe appeared to be positively correlated with overall measured U sorption. Batch sorption test results were used to develop generalized composite surface complexation models that incorporated the full genericsorption potential of each sample, without detailedmore » mineralogiccharacterization. The resultant models provide U sorption parameters (site densities and equilibrium constants) for reactive transport modeling. The generalized composite surface complexation sorption models were calibrated to batch sorption data from three oxidized core samples using inverse modeling, and gave larger sorption parameters than just U sorption on the measured solidphase Fe. These larger sorption parameters can significantly influence reactive transport modeling, potentially increasing U attenuation. Because of the limited number of calibration points, inverse modeling required the reduction of estimated parameters by fixing two parameters. The best-fit models used fixed values for equilibrium constants, with the sorption site densities being estimated by the inversion process. While these inverse routines did provide best-fit sorption parameters, local minima and correlated parameters might require further evaluation. Despite our limited number of proxy samples, the procedures presented provide a valuable methodology to consider for sites where metal sorption parameters are required. Furthermore, these sorption parameters can be used in reactive transport modeling to assess downgradient metal attenuation, especially when no other calibration data are available, such as at proposed U ISR sites.« less

  12. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    SciTech Connect (OSTI)

    2014-03-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27 (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.

  13. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th from 7:00 am to 7:00 pm (PST). During this time staff will upgrade the Genepool compute nodes to Debian 6. Also, the firmware for /projectb and /house will be updated. /projectb will be unavailable from 7:00 am to 7:00 pm (PST) and /house will be unavailable from 8:00 am to 1:00 pm (PST). Any webservices or workflows

  14. Maintenance | OpenEI Community

    Open Energy Info (EERE)

    Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

  15. CRAD, NNSA- Maintenance (MN)

    Office of Energy Efficiency and Renewable Energy (EERE)

    CRAD for Maintenance (MN). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  16. CRAD, Maintenance Assessment Plan

    Broader source: Energy.gov [DOE]

    An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations.

  17. Surveillance & Maintenance: The Requirements Based Surveillance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and ...

  18. Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned

    SciTech Connect (OSTI)

    Surovchak, S.; Kaiser, L.; DiSalvo, R.; Boylan, J.; Squibb, G.; Nelson, J.; Darr, B.; Hanson, M.

    2008-07-01

    The U.S. Department of Energy's (DOE's) Rocky Flats Site was established in 1951 as part of the United States' nationwide nuclear weapons complex to manufacture nuclear weapons components. In 1992 weapons production halted, and the Rocky Flats mission changed to include environmental investigations, cleanup, and site closure. In October 2005, DOE and its contractor completed an accelerated 10-year, $7 billion cleanup of chemical and radiological contamination left from nearly 50 years of production. The cleanup required the decommissioning, decontamination, demolition, and removal of more than 800 structures; removal of more than 500,000 cubic meters of low-level radioactive waste; and remediation of more than 360 potentially contaminated environmental sites. The final remedy for the site was selected in September 2006 and included institutional controls, physical controls, and continued monitoring for the former industrial portion of the site. The remainder of the site, which served as a buffer zone surrounding the former industrial area, was transferred to the U.S. Fish and Wildlife Service in July 2007 for a national wildlife refuge. DOE's Office of Legacy Management is responsible for the long-term surveillance and maintenance of Rocky Flats, which includes remedy implementation activities and general site maintenance. Several factors have complicated the transition from closure to post-closure at Rocky Flats. The early experiences associated with the two years since the physical cleanup and closure work were completed have led to several valuable lessons learned. (authors)

  19. Step 5: Operations and Maintenance

    Energy Savers [EERE]

    Process Step 5: Project Operations and Maintenance Project Development Process 1 Potential 5 Operations & Maintenance 3 Refinement 2 Options 4 Implementation 2 1/28/2016 2 Presentation Agenda * Step 5: Project Operations and Maintenance (O&M) * Post-procurement activities * Drivers * Technology examples * Activity 3 Potential Options Refinement Implementation Operations & Maintenance Step 5: Operations & Maintenance 4 Photo by Warren Getz, NREL 00180 Purpose: Conduct or ensure

  20. National Geothermal Data System Architecture Design, Testing and Maintenance

    Broader source: Energy.gov [DOE]

    Project objective: To create the National Geothermal Data System (NGDS) comprised of a core and distributed network of databases and data sites that will comprise a federated system for acquisition, management, maintenance, and dissemination of geothermal and related data.

  1. Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance

    Office of Legacy Management (LM)

    Second Quarter Calendar Year 2013 October 2013 LMS/RFS/S10694 This page intentionally left blank LMS/RFS/S10694 Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Second Quarter Calendar Year 2013 October 2013 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-2nd Quarter CY 2013 October 2013 Doc. No. S10694 Page i Contents Abbreviations

  2. Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance

    SciTech Connect (OSTI)

    2012-03-01

    This document presents guidance for implementing the process that the U.S. Department of Energy (DOE) Office of Legacy Management (LM) will use for assuming perpetual responsibility for a closed uranium mill tailings site. The transition process specifically addresses sites regulated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) but is applicable in principle to the transition of sites under other regulatory structures, such as the Formerly Utilized Sites Remedial Action Program.

  3. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

    SciTech Connect (OSTI)

    2013-11-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

  4. OpenEI Community - Maintenance

    Open Energy Info (EERE)

    maintenance March 8-9, 2013 http:en.openei.orgcommunityblogopenei-maintenance-march-8-9-2013

    We would like to inform the OpenEI community that OpenEI will be...

  5. Operations and Maintenance Best Practices Guide | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide The Federal Energy Management Program's Operations and Maintenance (O&M) Best ...

  6. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday,...

  7. Addressing Deferred Maintenance, Infrastructure Costs, and Excess...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities ...

  8. Y-12 demos former utilities and maintenance facility | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration demos former utilities and maintenance facility Friday, September 26, 2014 - 1:05pm The Y-12 National Security Complex recently completed another improvement in its site infrastructure with the demolition of Building 9744, a former utilities and maintenance facility occupying more than 9,000 square feet. Despite structural issues and waste disposal concerns, the facility was safely demolished nearly two months ahead of schedule. The demolition proved challenging due

  9. Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness

    SciTech Connect (OSTI)

    Vesely, W.E.; Rezos, J.T.

    1995-09-01

    This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

  10. Upcoming BPAT Systems Maintenance Events

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming-BPAT-Systems-Maintenance-Events Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer...

  11. US Department of Energy - Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Howdy fellow energy adventurer Energy.gov is currently undergoing routine maintenance that will make it even more awesome. Please try again in a few minutes. We...

  12. Tim Kuneli, Electronics Maintenance Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tim Kuneli, Electronics Maintenance Group Print The recent ALS power supply failure was one of the most challenging projects that Electronics Engineer Technical Superintendent Tim...

  13. Web Maintenance Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance Requirements Web Maintenance Requirements The Office of Energy Efficiency and Renewable Energy (EERE) expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance: technical maintenance and content maintenance. Websites that are no longer being maintained should be archived. Read more about EERE's expectations for website maintenance. Maintenance Schedule All Web Coordinators should ensure these tasks

  14. Programmatic agreement among the USDOE/RL Operations Office, the Advisory Council on Historic Preservation, and the WA State Historic Preservation Office for the maintenance, deactivation, alteration and demolition of the built environment on the Hanford Site, Washington

    SciTech Connect (OSTI)

    Lloyd, D.W.

    1997-08-01

    This Programmatic Agreement (PA) addresses the built environment (i.e., buildings and structures) constructed during the Manhattan Project and Cold War Era periods of Hanford`s operational history. As such it encompasses the years 1943 through 1990. The identification, evaluation, and treatment of buildings and historic archeological remains on the Hanford Site predating 1943 will be accomplished through Sections 800.4 through 800.6 of the Council`s regulations. This PA will be in effect from the date of signature until September 30, 2000. Completion of the Sitewide Treatment Plan established under this PA satisfies all Section 106 requirements for identification, evaluation, and treatment necessary for all undertakings, up to and including demolition which may affect Manhattan Project and Cold War Era properties. This PA may be extended if the Sitewide Treatment Plan has not been completed by the end of FY 2000. Identification, evaluation, and treatment of properties constructed on the Hanford Site after 1990 will be handled pursuant to the regulations in effect at the time such properties are eligible for review.

  15. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  16. Requirements Based Surveillance and Maintenance Review Process...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form PDF icon Requirements Based ...

  17. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in ...

  18. Efficiency Lighting & Maintenance Inc | Open Energy Information

    Open Energy Info (EERE)

    & Maintenance Inc Jump to: navigation, search Name: Efficiency Lighting & Maintenance Inc Address: 5a Del Mar Drive Place: Brookfield, Connecticut Zip: 06804 Region: Northeast - NY...

  19. Geothermal Data Development, Collection, and Maintenance | Open...

    Open Energy Info (EERE)

    Data Development, Collection, and Maintenance Jump to: navigation, search Geothermal ARRA Funded Projects for Geothermal Data Development, Collection, and Maintenance Loading...

  20. Maintenance Planner | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance Planner Department: Facilities Requisition Number: 1501075 Position Summary: This multi-trade Maintenance Planner position will enhance the Lab's Facilities Division...

  1. Spring Home Maintenance: Windows, Windows, Windows! | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Spring Home Maintenance: Windows, Windows, Windows Spring Home Maintenance: Windows, Windows, Windows April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air ...

  2. Low-level waste vitrification contact maintenance viability study

    SciTech Connect (OSTI)

    Leach, C.E., Westinghouse Hanford

    1996-07-12

    This study investigates the economic viability of contact maintenance in the Low-Level Waste Vitrification Facility, which is part of the Hanford Site Tank Waste Remediation System. This document was prepared by Flour Daniel, Inc., and transmitted to Westinghouse Hanford Company in September 1995.

  3. 25 Years Of Environmental Remediation In The General Separations Area Of The Savannah River Site: Lessons Learned About What Worked And What Did Not Work In Soil And Groundwater Cleanup

    SciTech Connect (OSTI)

    Blount, Gerald; Thibault, Jeffrey; Millings, Margaret; Prater, Phil

    2015-03-16

    The Savannah River Site (SRS) is owned and administered by the US Department of Energy (DOE). SRS covers an area of approximately 900 square kilometers. The General Separation Area (GSA) is located roughly in the center of the SRS and includes: radioactive material chemical separations facilities, radioactive waste tank farms, a variety of radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the GSA from the mid-1950s through the mid-1990s. Radioactive operations at the F Canyon began in 1954; radioactive operations at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground (ORWBG) began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility (MWMF) and Low Level Radioactive Waste Disposal Facility (LLRWDF) received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970s, 1980s, and 1990s led to changes in waste management and environmental cleanup practices at SRS. The US Congress passed the Clean Air Act in 1970, and the Clean Water Act in 1972; the Resource Conservation and Recovery Act (RCRA) was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980; the Federal Facilities Compliance Act (FFCA) was signed into law in 1992. Environmental remediation at the SRS essentially began with a 1987 Settlement Agreement between the SRS and the State of South Carolina (under the South Carolina Department of Health and Environmental Control - SCDHEC), which recognized linkage between many SRS waste management facilities and RCRA. The SRS manages several of the larger groundwater remedial activities under RCRA for facilities recognized early on as environmental problems. All subsequent environmental remediation projects tend to be managed under tri-party agreement (DOE, Environmental Protection Agency, and SCDHEC) through the Federal Facilities Agreement. During 25 years of environmental remediation SRS has stabilized and capped seepage basins, and consolidated and capped waste units and burial grounds in the GSA. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Over the last 25 years concentrations of contaminants in the aquifers beneath the GSA and in surface water streams in the GSA have dropped significantly. Closure of 65 waste sites and 4 RCRA facilities has been successfully accomplished. Wastes have been successfully isolated in place beneath a variety of caps and cover systems. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. SRS operated two very large pump and treat systems at the F and H Seepage Basins to attempt to limit the release of tritium to Fourmile Branch, a tributary of the Savannah River. The systems were designed to extract contaminated acidic groundwater, remove all contamination except tritium (not possible to remove the tritium from the water), and inject the tritiated groundwater up-gradient of the source area and the plume. The concept was to increase the travel time of the injected water for radioactive decay of the tritium. The two systems were found to be non-effective and potentially mobilizing more contamination. SRS invested approximately $50 million in construction and approximately $100 million in 6 years of operation. The H Seepage Basin pump and treat system was replaced by a series of subsurface barriers that alters the groundwater velocity; the F Seepage Basin pump and treat system was replaced by subsurface barriers forming a funnel and gate augmented by chemical treatment within the gates. These replacement systems are mostly passive and cost approximately $13 million to construct, and have reduced the tritium flux to Fourmile Branch, in these plumes, by over 70%. SRS manages non-acidic tritiated groundwater releases to Fourmile Branch from the southwest plume of the MWMF with a forest irrigation system. Tritiated water is captured with a sheetpile dam below the springs that caused releases to Fourmile Branch. Water from the irrigation pond is pumped to a filter plant prior to irrigation of approximately 26 hectares of mixed forest and developing pine plantation. SRS has almost achieved a 70% reduction in tritium flux to the Branch from this plume. The system cost approximately $5 million to construct with operation cost of approximately $500K per year. In conclusion, many lessons have been learned in 25 years of relatively aggressive remedial activities in the GSA. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. In water management situations with non-accumulative contaminants (tritium, VOCs, etc.) irrigation in a forest setting can be very effective.

  4. Site Index - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Index Site Index Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Site Index Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size About Us About Hanford Cleanup Regulators, Boards, Councils Hanford Advisory Board Hanford Natural Resource Trustee Council Environmental Protection Agency Washington State Department of Ecology Defense Nuclear Facilities Safety Board Hanford History Hanford Site Wide Programs DOE Human Resources Management

  5. Operations & Maintenance Best Practices Guide: Chapter 3

    Broader source: Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  6. Iron production maintenance effectiveness system

    SciTech Connect (OSTI)

    Augstman, J.J.

    1996-12-31

    In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

  7. Grand Junction, Colorado, Disposal Site Long-Term Surveillance...

    Office of Legacy Management (LM)

    ... Grand Junction, Colorado, Disposal Site Long-Term Surveillance and Maintenance Program The Grand Junction Office has provided cost-effective and efficient stewardship for more than ...

  8. Community Wind Handbook/Understand Preliminary Siting | Open...

    Open Energy Info (EERE)

    * Submit Permit Applications * Find an Installer * Purchase Equipment * Plan for Maintenance Understand Preliminary Siting Wind turbines operate best in open areas with limited...

  9. Los Alamos Site Office Nuclear Maintenance Management Program...

    Office of Environmental Management (EM)

    ... 830.120, Subpart B, Safety Basis Requirements DOE P 226.1B, Department of Energy Oversight Policy DOE O 226.1B, Implementation of Department of Energy Oversight Policy ...

  10. Site Transition Framework for Long-Term Surveillance and Maintenance

    Office of Environmental Management (EM)

  11. Drive alignment pays maintenance dividends

    SciTech Connect (OSTI)

    Fedder, R.

    2008-12-15

    Proper alignment of the motor and gear drive on conveying and processing equipment will result in longer bearing and coupling life, along with lower maintenance costs. Selecting an alignment free drive package instead of a traditional foot mounted drive and motor is a major advancement toward these goals. 4 photos.

  12. Maintenance neutron coincidence counter manual

    SciTech Connect (OSTI)

    Krick, M.S.; Polk, P.J.; Atencio, J.D.

    1989-09-01

    A compact thermal-neutron coincidence counter has been constructed specifically for use by the International Atomic Energy Agency as a reference neutron detector for maintenance activities. The counter is designed for use only with {sup 252}Cf sources in SR-CF-100 capsules. This manual describes the detector's mechanical and electrical components and its operating characteristics. 2 refs., 8 figs.

  13. EA-1906: Operations, Consolidation, and Upgrades at the Office of Secure Transportation Western Command Site, Albuquerque, NM

    Broader source: Energy.gov [DOE]

    This EA evaluates environmental impacts associated with the siting and construction of several proposed buildings, including a new vehicle maintenance facility and mobile equipment maintenance building (and their support structures) at the Western Command Site, Albuquerque, NM.

  14. Site Transition Framework | Department of Energy

    Energy Savers [EERE]

    Framework Site Transition Framework Site Transition Framework (April 2004) PDF icon Site Transition Framework More Documents & Publications Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance Long-Term Stewardship Study Recommendation 218: Develop a Fact Sheet on Site Transition at On-going Mission Sites

  15. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  16. Hanford Site Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. ); Yancey, E.F. )

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  17. Site Feeds - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Feeds Site Feeds Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Hanford RSS Feeds Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size RSS Feed Links Site News RSS Did You Know RSS What's New RSS Event Calendar RSS Recent Videos RSS Press Releases RSS What is a feed? A feed is a document that contains summaries of web content with web links to the original versions. It may be viewed with a feed reader or news aggregator. If you

  18. General Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    General Information JLF Contacts Request a Tour

  19. Operations and Maintenance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Operations and Maintenance Operations and Maintenance Photo of a man, wearing a yellow hard hat, looking at a wall with panels and wires mounted to it. Lower ...

  20. Preventive Maintenance Strategies for Compressed Air Systems

    Broader source: Energy.gov [DOE]

    This tip sheet discusses preventive maintenance strategies for compressed air systems to avoid high equipment repair and replacement costs.

  1. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  2. Operations & Maintenance Best Practices Guide: Chapter 9

    Broader source: Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  3. Africa's Transport Infrastructure Mainstreaming Maintenance and...

    Open Energy Info (EERE)

    Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming...

  4. Operations & Maintenance Best Practices Guide: Appendix a

    Broader source: Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  5. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  6. Operations & Maintenance Best Practices Guide: Appendix d

    Broader source: Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  7. Operations & Maintenance Best Practices Guide: Chapter 2

    Broader source: Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  8. Operations & Maintenance Best Practices Guide: Chapter 1

    Broader source: Energy.gov [DOE]

    Guide describes chapter 1 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  9. Operations & Maintenance Best Practices Guide: Chapter 5

    Broader source: Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  10. Operations & Maintenance Best Practices Guide: Chapter 8

    Broader source: Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  11. Operations & Maintenance Best Practices Guide: Chapter 7

    Broader source: Energy.gov [DOE]

    Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  12. Operations & Maintenance Best Practices Guide: Chapter 10

    Broader source: Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  13. Operations & Maintenance Best Practices Guide: Appendix c

    Broader source: Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  14. Operations & Maintenance Best Practices Guide: Appendix B

    Broader source: Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  15. Operations & Maintenance Best Practices Guide: Chapter 11

    Broader source: Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  16. U.S. Department of Energy Office of Inspector General report on inspection of Westinghouse Savannah River Company fees for managing and operating the Savannah River Site

    SciTech Connect (OSTI)

    1995-08-03

    During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department`s annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth in fees over this five year period. The review disclosed that, after Fiscal Year 1989, the Department used an increasing number of fee bases in calculating Westinghouse Savannah River Company`s fixed-fee-equivalents from the maximum fee schedules within the Department of Energy Acquisition Regulation. The authors found that the Department had significantly increased the percentage of the dollar value of subcontracts being placed in Westinghouse`s fee bases for fee calculation purposes. They found that the Department had effectively increased Westinghouse`s fixed-fee-equivalents by approximately $3 million in both Fiscal Year 1993 and 1994 to, in large part, fund an unallowable employee incentive compensation program. They found that Westinghouse`s total paid fees for the five year period increased significantly over what they would have been had the terms resulting from the original competitive negotiations been maintained. The authors recommended that the Deputy Assist Secretary for Procurement and Assistance Management require that changes in either the number or composition of fee bases used in calculating fees from the maximum fee schedules be submitted to the Department`s Procurement Executive for approval.

  17. DOE - Office of Legacy Management -- Mound Site

    Office of Legacy Management (LM)

    The site long-term monitoring responsibility transferred to the Office of Legacy Management(LM) in 2010 and requires operation and maintenance of a pump and treatment system, ...

  18. Emergency diesel generator: Maintenance and failure unavailability, and their risk impacts

    SciTech Connect (OSTI)

    Samanta, P.; Kim, I.; Uryasev, S.; Penoyar, J.; Vesely, W.

    1994-11-01

    Emergency Diesel Generators (EDGs) provide on-site emergency alternating current (ac) electric power for a nuclear plant in the event that all off-site power sources are lost. Existing regulations establish requirements for designing and testing of these on-site power sources to reduce to an acceptable level the probability of losing all ac power sources. Operating experience with EDGs has raised questions about their testing and maintenance to achieve the EDG reliability levels and the total EDG unavailability experienced (fraction of time EDG is out-of-service due to testing, maintenance, and failures). In this report, recent operating experience is used to assess EDG unavailability due to testing, maintenance, and failures during reactor power operation and during plant shutdown. Recent data show an improvement in EDG reliability, but an increase in EDG unavailability due to maintenance, a significant portion of which is due to routinely scheduled maintenances. Probabilistic safety assessments (PSAs) of selected nuclear power plants are used to assess the risk impact of EDG unavailability due to maintenance and failure during power operation, and during different stages of plant shutdown. The results of these risk analyses suggest qualitative insights for scheduling EDG maintenance that will have minimal impact on risk of operating nuclear power plants.

  19. Update on maintenance and service costs of commercial building ground-source heat pump systems

    SciTech Connect (OSTI)

    Cane, D.; Garnet, J.M.

    2000-07-01

    An earlier paper showed that commercial ground-source heat pump systems have significantly lower service and maintenance costs than alternative HVAC systems. This paper expands on those results by adding 13 more buildings to the original 25 sites and by comparing the results to the latest ASHRAE survey of HVAC maintenance costs. Data from the 38 sites are presented here including total (scheduled and unscheduled) maintenance costs in cents per square foot per year for base cost, in-house, and contractor-provided maintenance. Because some of the new sites had maintenance costs that were much higher than the industry norm, the resulting data are not normally distributed. Analysis (O'Hara Hines 1998) indicated that a log-normal distribution is a better fit; thus, the data are analyzed and presented here as log-normal. The log-mean annual total maintenance costs for the most recent year of the survey ranged from 6.07 cents per square foot to 8.37 cents per square foot for base cost and contractor-provided maintenance, respectively.

  20. Solar Water Heating System Maintenance and Repair | Department...

    Energy Savers [EERE]

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | ...

  1. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. |...

  2. New Resin Improves Efficiency, Reduces Costs in Hanford Site...

    Office of Environmental Management (EM)

    the operation of pump-and-treat facilities along the Columbia River at the Hanford site. ... Site Groundwater Treatment Dean Neshem, a pump-and-treat operations and maintenance ...

  3. Site Environmental Report, 1993

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The Site Environmental Report (SER) is prepared annually in accordance with DOE Order 5400.1, ``General Environmental Protection Program.`` This 1993 SER provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA). For some readers, the highlights provided in the Executive Summary may provide sufficient information. Many readers, however, may wish to read more detailed descriptions of the information than those which are presented here.

  4. Microsoft Word - FINAL Contact Record 2012-01 Roads Maintenance

    Office of Legacy Management (LM)

    RFLMA Contact Record 2012-01 page 1 of 6 ROCKY FLATS SITE REGULATORY CONTACT RECORD Purpose: Soil Disturbance Review Plan-Roads maintenance, including grading the road to the former A-3 Pond to convert the road to two-track vehicle use. Contact Record Approval Date: May 31, 2012 Site Contact(s)/Affiliation(s): Scott Surovchak, U.S. Department of Energy (DOE); Gwen Hooton, DOE; Rick DiSalvo, S.M. Stoller Corporation (Stoller); Kurt Franzen, Stoller; Linda Kaiser, Stoller Regulatory

  5. Terms and Conditions for Site Transition | Department of Energy

    Energy Savers [EERE]

    Terms and Conditions for Site Transition Terms and Conditions for Site Transition Terms and Conditions for Site Transition PDF icon Terms and Conditions for Site Transition More Documents & Publications Development of Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition Terms and Conditions for EM Clean Up to the Office of Science Site Transition Framework for Long-Term Surveillance and Maintenance

  6. On-line maintenance methodology development and its applications

    SciTech Connect (OSTI)

    Kim, J.; Jae, M.

    2012-07-01

    With the increasing economic pressures being faced and the potential for shortening outage times under the conditions of deregulated electricity markets in the world, licensees are motivated to get an increasing amount of the on-line maintenance (OLM). The benefits of the OLM includes increased system and plant reliability, reduction of plant equipment and system material condition deficiencies that could adversely impact operations, and reduction of work scope during plant refueling outages. In Korea, allowance guidelines of risk assessment is specified in the safety regulation guidelines 16.7 and 16.8 of the Korea Inst. of Nuclear Safety (KINS), which is 'General guidelines of Risk-informed application for requesting permission of changes' and 'Requesting permission of changes of Risk-informed application for Technical Specification'. We select the emergency diesel generator (EDG) of the Ulchin unit 3 and 4 for risk assessment analysis by applying configuration changes. The EDG which has plant safety level IE belongs to on-site standby power (A, B train EDG) in electric distribution system. The EDG is important component because it should maintain standby status during plant is operating, therefore we select the EDG for target component of risk assessment analysis. The risk assessment is limited to CDF. The risk assessment is performed by using AIMS-PSA Release2. We evaluate CDF by applying the configuration changes with some assumptions. Evaluation of the full power operation and Low power/Shut down operation was performed. This study has been performed for introducing a methodology and performing risk assessment. (authors)

  7. No maintenance -- no energy efficiency

    SciTech Connect (OSTI)

    Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

    1994-12-01

    Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

  8. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  9. The Effects of Maintenance Actions on the PFDavg of Spring Operated Pressure Relief Valves

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Harris, S.; Gross, R.; Goble, W; Bukowski, J

    2015-12-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accountedmore » for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.« less

  10. The Effects of Maintenance Actions on the PFDavg of Spring Operated Pressure Relief Valves

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.; Goble, W; Bukowski, J

    2015-12-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

  11. Scheduled Maintenance Periods | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled Maintenance Periods The CNM holds three maintenance periods per year. During these times certain CNM facilities may not be available for user activities. The Sector 26 beamline will not be available, the High-Performance Computing Cluster and nanofabrication facilities often are not available, and other facilities may undergo maintenance for only one or two days. Please contact your CNM Scientific Contact prior to arrival and plan your work visits and schedules accordingly. To better

  12. FAQS Reference Guide – Facility Maintenance Management

    Broader source: Energy.gov [DOE]

    This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

  13. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  14. Pacific Northwest National Laboratory Grounds Maintenance

    SciTech Connect (OSTI)

    2009-08-05

    FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.

  15. DOE - Office of Legacy Management -- SiteA

    Office of Legacy Management (LM)

    Illinois Site A/Plot M Decommissioned Reactor Site Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2013 Inspection and Annual Site Status Report for the Site A/Plot M, Cook County, Illinois Decontamination and Decommissioning Program Site Annual Monitoring Report Environmental Monitoring Program at Site A and Plot M, Palos Forest Preserve, Cook County, Illinois Long-Term Surveillance and Maintenance Plan for Site A/Plot M, Illinois,Decommissioned

  16. Oregon General Industrial Water Pollution Control Facilities...

    Open Energy Info (EERE)

    General Industrial Water Pollution Control Facilities Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon General Industrial Water Pollution...

  17. Surveillance & Maintenance: The Requirements Based Surveillance and

    Energy Savers [EERE]

    Maintenance Review Process (RBSM) | Department of Energy Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in

  18. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994

    SciTech Connect (OSTI)

    Anderson, L.A.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

    1995-03-01

    The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL`s control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994.

  19. Maintenance for the Millennium: Another Approach

    SciTech Connect (OSTI)

    Sculthorpe, Barruy R.

    2002-07-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  20. General Information

    National Nuclear Security Administration (NNSA)

    Site Waste Profile Sheet - Revision 0 - February 27, 2012 (Log No. 2012-048) A. Generator Information 1. Company name: ...

  1. Proceedings: 1996 EPRI fossil plant maintenance conference

    SciTech Connect (OSTI)

    1996-07-01

    EPRI sponsors many conferences and workshops addressing various aspects of fossil power plant maintenance. Featured have been topics such as inspection methods, life assessment techniques, overhaul planning, predictive maintenance programs, thermography, vibration monitoring, welding, and component-specific events on boilers, condensers, feedwater heaters, generators, and turbines. The 1996 EPRI Fossil Plant Maintenance Conference-held July 29-August 1, 1996, in Baltimore, Maryland-reached a wider audience by providing a forum to discuss all aspects of fossil plant maintenance. Knowledgeable industry personnel exchanged information on state-of-the-art technology; identified major unresolved problems; and helped establish priorities for further research, development, and demonstration in fossil plant maintenance. This document presents report presented at the conference. Individual papers have been processed separately for the United States Department of Energy databases.

  2. Ohio Web Sites

    U.S. Energy Information Administration (EIA) Indexed Site

    Restructuring > Ohio Web Sites Ohio Web Sites Other Links Ohio Electricity Profile Ohio Energy Profile Ohio Restructuring Last Updated: April 2007 Sites Links Public Utilities Commission of Ohio: http://www.puco.ohio.gov/puco.cfm Ohio General Assembly: http://www.legislature.state.oh.us/ Office of the Ohio Consumers' Council: http://www.pickocc.org/ FirstEnergy Corporation: http://www.firstenergycorp.com/ American Electric Power: http://www.aep.com/ The Dayton Power and Light Company:

  3. Requirements Based Surveillance and Maintenance Review Process Interview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Form | Department of Energy Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form PDF icon Requirements Based Surveillance and Maintenance Review Process Interview Form More Documents & Publications Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Guidance to Completing the Self-Directed RBSM Interview Form CX-000473: Categorical Exclusion

  4. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the Department, of records relating to space and maintenance PDF icon ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE

  5. Hanford Site Comprehensive site Compliance Evaluation Report

    SciTech Connect (OSTI)

    Tollefson, K.S.

    1997-08-05

    This document is the second annual submittal by WHC, ICF/KH, PNL and BHI and contains the results of inspections of the stormwater outfalls listed in the Hanford Site Storm Water Pollution Prevention Plan (SWPPP) (WHC 1993a) as required by General Permit No. WA-R-00-000F (WA-R-00-A17F): This report also describes the methods used to conduct the Storm Water Comprehensive Site Compliance Evaluation, as required in Part IV, Section D, {ampersand} C of the General Permit, summarizes the results of the compliance evaluation, and documents significant leaks and spills.

  6. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  7. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday, November 11, from 08:00 until 18:00 PST. Several systems and services will be unavailable during this time. Edison, Hopper, Data Transfer nodes, and Science Gateway (data portal) nodes will be unavailable 08:00 - 13:00. Carver/Dirac, PDSF, and Genepool will be unavailable 08:00 - 18:00. HPSS and web servers

  8. Adrian, Michigan, Site Fact Sheet

    Office of Legacy Management (LM)

    Adrian, Michigan, Site. This site is managed by the U.S. Department of Energy Office of Legacy Management under the Formerly Utilized Sites Remedial Action Program. Adrian, Michigan, Site OHIO MICHIGAN Adrian Site 94 475 80 20 127 23 12 223 Adrian Ann Arbor Jackson Ypsilanti Toledo M:\LTS\111\0001\10\S03045\S0304500.mxd smithw 09/16/2011 9:59:58 AM 0 5 10 Miles Lansing MICHIGAN Location of the Adrian, Michigan, Site Site Description and History The Adrian, Michigan, Site (formerly the General

  9. Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    site Hamel welcomes Inslee to the Waste Treatment Plant construction site Inslee and Wade at Pretreatment Inslee and Wade at Pretreatment Inslee meets with Hamel and Huizenga...

  10. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to...

  11. General Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Law Student Intern Program General Counsel Law Student Intern Program The Department of Energy's Office of the General Counsel is accepting applications on a rolling basis for its Law Student Intern Program. The Office of the General Counsel offers an exciting opportunity for law students to gain firsthand exposure to the fast-moving and evolving practice of energy law. The General Counsel is charged by the Secretary of Energy with the authority to determine the Department's authoritative

  12. Facility Maintenance Management Functional Area Qualification...

    Office of Environmental Management (EM)

    ... DOE O 433.1B and in accordance with DOE O 226.1B. B. Review submitted NMMP description ... facility maintenance management. 1. DOE O 226.1B, Implementation of Department of Energy ...

  13. Operations and Maintenance in Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and recycling-type pump, works properly over the long term. Effective operations and maintenance plans help ensure federal equipment, such as this water recovery- and recycling-typ...

  14. Sound maintenance practices protect fan investments

    SciTech Connect (OSTI)

    Bauer, M.

    2009-11-15

    Since underground coal miners depend on axial fans, lack of maintenance could prove costly. A number of pre-emptive actions that can help keep fans running at optimal performance can also be taken. 2 photos.

  15. BPAT Systems Maintenance - December 12, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 12122014 BPAT's e-Tag and OASIS software vendor will be performing a...

  16. BPAT Systems Maintenance - November 5, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 1152014 BPAT's e-Tag and OASIS software vendor will be performing a...

  17. BPAT Systems Maintenance - February 9, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 292015 BPAT's e-Tag and OASIS software vendor will be performing a...

  18. BPAT Systems Maintenance - March 6, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 362015 BPAT's e-Tag and OASIS software vendor will be performing a...

  19. Website Maintenance Process and Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Website Maintenance Process and Template Website Maintenance Process and Template Below you can read more about EERE's expectations for website maintenance. In June and December every year, Web coordinators will be asked to attend two special Web Governance Team meetings to report on their website maintenance plans for the rest of the fiscal year. Fill out the Web maintenance template before attending this meeting and email it to the WGT facilitator. File Website maintenance process Microsoft

  20. Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Vehicle Maintenance and Safety to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle Maintenance

  1. Site Operator Program

    SciTech Connect (OSTI)

    Warren, J.F.

    1991-01-01

    Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

  2. Site Operator Program

    SciTech Connect (OSTI)

    Warren, J.F.

    1991-12-31

    Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

  3. NNSA Sites

    Office of Energy Efficiency and Renewable Energy (EERE)

    Compliance agreements for National Nuclear Security Administration sites are listed here with accompanying summaries.

  4. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the ...

  5. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 4 Computerized Maintenance Management System 4.1 Introduction A computerized maintenance management system (CMMS) is a type of management software that performs ...

  6. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Identify tasks that may be performed by operations maintenance personnel. 7. Analyze ... 1999 Maintainability and Maintenance Management By: Joseph D. Patton, Jr. Published ...

  7. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Step 1: Strive to increase management awareness and appreciation of the operations and maintenance programdepartment. * Consider developing a maintenance mission statement and ...

  8. Project Profile: Innovative Application of Maintenance-Free Phase...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Systems Project Profile: Innovative Application of Maintenance-Free Phase-Change Thermal ...

  9. FEMP Offers New Training on Photovoltaic Operations and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New Training on Photovoltaic Operations and Maintenance Best Practices FEMP Offers New Training on Photovoltaic Operations and Maintenance Best Practices November 4, 2014 - 2:40pm ...

  10. Color Maintenance of LEDs in Laboratory and Field Applications...

    Office of Scientific and Technical Information (OSTI)

    Color Maintenance of LEDs in Laboratory and Field Applications Citation Details In-Document Search Title: Color Maintenance of LEDs in Laboratory and Field Applications Synopsis: ...

  11. FY 2013 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  12. FY 2012 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  13. EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    42: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area ... EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western ...

  14. How to Determine and Verify Operating and Maintenance Savings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determine and Verify Operating and Maintenance Savings in Federal Energy Savings Performance Contracts How to Determine and Verify Operating and Maintenance Savings in Federal ...

  15. FY 2014 Real Property Data Related to Operations and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance PDF icon FY2014DataRelatedtoOperati...

  16. Innovative Application of Maintenance-Free Phase-Change Thermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Engine Solar Power Generation Innovative Application of Maintenance-Free Phase-Change Thermal Energy ...

  17. GIZ Sourcebook Module 4b: Inspection and Maintenance and Roadworthines...

    Open Energy Info (EERE)

    b: Inspection and Maintenance and Roadworthiness Jump to: navigation, search Tool Summary LAUNCH TOOL Name: GIZ Sourcebook Module 4b: Inspection and Maintenance and Roadworthiness...

  18. Hopper scheduled maintenance tomorrow (Sept 19) and /project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and project outage Hopper scheduled maintenance tomorrow (Sept 19) and project outage September 18, 2012 by Helen He There will be a...

  19. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Locally, Prestige Maintenance also provides grounds maintenance at Ft. Eustis and at Langley Air Force Base. Jefferson Science Associates, LLC, a joint venture of the Southeastern ...

  20. Long-Term Surveillance and Maintenance Program 2003 Report |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program 2003 Report Long-Term Surveillance and Maintenance Program 2003 Report Long-Term Surveillance and Maintenance Program 2003 Report PDF icon Long-Term Surveillance and ...

  1. Operations & Maintenance Best Practices Guide: Chapter 4 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Operations & Maintenance Best Practices Guide: Chapter 4 Guide to chapter 4 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency. Chapter...

  2. INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY2006

    SciTech Connect (OSTI)

    B. E. Olaveson

    2006-10-02

    This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during Fiscal Year 2006. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document.

  3. 1994 Site environmental report

    SciTech Connect (OSTI)

    1995-07-01

    The Fernald site is a Department of Energy (DOE)-owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the site in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. The Site Environmental Report (SER) is prepared annually in accordance with DOE Order 5400.1, General Environmental Protection Program. This 1994 SER provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, U.S. Environmental Protection Agency (USEPA), and Ohio EPA (OEPA). For some readers, the highlights provided in this Executive Summary may provide sufficient information. Many readers, however, may wish to read more detailed descriptions of the information than those which are presented here. All information presented in this summary is discussed more fully in the main body of this report.

  4. Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Did You Know Did You Know Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Did You Know Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Close Did you know.... Close

  5. The meteorological monitoring audit, preventative maintenance and quality assurance programs at a former nuclear weapons facility

    SciTech Connect (OSTI)

    Maxwell, D.R.

    1995-12-31

    The purposes of the meteorological monitoring audit, preventative maintenance, and quality assurance programs at the Rocky Flats Environmental Technology Site (Site), are to (1) support Emergency Preparedness (EP) programs at the Site in assessing the transport, dispersion, and deposition of effluents actually or potentially released into the atmosphere by Site operations; and (2) provide information for onsite and offsite projects concerned with the design of environmental monitoring networks for impact assessments, environmental surveillance activities, and remediation activities. The risk from the Site includes chemical and radioactive emissions historically related to nuclear weapons component production activities that are currently associated with storage of large quantities of radionuclides (plutonium) and radioactive waste forms. The meteorological monitoring program provides information for site-specific weather forecasting, which supports Site operations, employee safety, and Emergency Preparedness operations.

  6. FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting

    Energy Savers [EERE]

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2012 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum (July 13, 2010)

  7. TRACKING SITE

    Energy Science and Technology Software Center (OSTI)

    003235MLTPL00 AASG Geothermal Data submissions tracking application and site. https://github.com/usgin/aasgtrack

  8. Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Cleanup Tours Hanford Site Cleanup Tours Tour Registration Required Forms of ID Tour Information Tour Route Find Confirmation Seat Notification Frequently Asked Questions Media Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size This website will not function with Javascript disabled Tour Information Hanford Site Cleanup Tours Hanford Site Cleanup Tours for the public are planned on the following dates: May 3, 11, 17, 24 and 25 June 1, 7, 15, 21, 28, and

  9. CleanFleet. Final report: Volume 3, vehicle maintenance and durability

    SciTech Connect (OSTI)

    1995-12-01

    CleanFleet is a demonstration of panel vans operating on five alternative motorfuels in commercial package delivery operations in the South Coast Air Basin of California. The five alternative fuels are propane gas, compressed natural gas (CNG), California Phase 2 reformulated gasoline (RFG), methanol (M-85 with 15 percent RFG), and electricity. Data were gathered on in-use emissions, operations, and fleet economics. This volume of the final report summarizes the maintenance required on these vans from the time they were introduced into the demonstration (April through early November 1992) until the end of the demonstration in September 1994. The vans were used successfully in FedEx operations; but, to varying degrees, the alternative fuel vehicles required more maintenance than the unleaded gasoline control vehicles. The maintenance required was generally associated with the development state of the fuel-related systems. During the demonstration, no non-preventive maintenance was required on the highly developed fuel-related systems in any of the unleaded gasoline production vehicles used either as controls or as RFG test vehicles. The maintenance problems encountered with the less developed systems used in this demonstration may persist in the short term with vehicles featuring the same or similar systems. This means that fleet operators planning near-term acquisitions of vehicles incorporating such systems should consider the potential for similar problems when (1) selecting vendors and warranty provisions and (2) planning maintenance programs.

  10. 2003 Long-Term Surveillance and Maintenance Program Report

    SciTech Connect (OSTI)

    2004-07-01

    Radioactive waste was created by the Federal Government and private industry at locations around the country in support of national defense, research, and civilian power-generation programs. If not controlled, much of this legacy waste would remain hazardous to human health and the environment indefinitely. Current technology does not allow us to render this waste harmless, so the available methods to control risk rely on consolidation, isolation, and long-term management of the waste. The U.S. Department of Energy (DOE) has an obligation to safely control the radioactive waste and to inform and train future generations to maintain and, perhaps, improve established protections. DOE is custodian for much of the radioactive and other hazardous waste under control of the Federal Government. DOE established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 and the Defense Decontamination and Decommissioning (D&D) Program and the Surplus Facilities Management Program in the 1980s. Congress passed the Uranium Mill Tailings Radiation Control Act (UMTRCA) in 1978. These federal programs and legislation were established to identify, remediate, and manage legacy waste. Remedial action is considered complete at a radioactive waste site when the identified hazardous material is isolated and the selected remedial action remedy is in place and functioning. Radioactive or other hazardous materials remain in place as part of the remedy at many DOE sites. Long-term management of radioactive waste sites incorporates a set of actions necessary to maintain protection of human health and the environment. These actions include maintaining physical impoundment structures in good repair to ensure that they perform as designed, preventing exposure to the wastes by maintaining access restrictions and warnings, and recording site conditions and activities for future custodians. Any actions, therefore, that will prevent exposure to the radioactive waste now or in the future are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE’s responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation’s nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE’s legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM–50), as well as management of remedies involving ground water and surface water contaminated by former processing activities.

  11. Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    CNG Fuel System and Cylinder Maintenance to someone by E-mail Share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Facebook Tweet about Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Twitter Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Google Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Delicious Rank Alternative Fuels Data Center: CNG Fuel System and Cylinder

  12. Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Facility Ryder Opens Natural Gas Vehicle Maintenance Facility to someone by E-mail Share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Facebook Tweet about Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Twitter Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Google Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on

  13. Accelerated learning approaches for maintenance training

    SciTech Connect (OSTI)

    Erickson, E.J.

    1991-01-01

    As a training tool, Accelerated Learning techniques have been in use since 1956. Trainers from a variety of applications and disciplines have found success in using Accelerated Learning approaches, such as training aids, positive affirmations, memory aids, room arrangement, color patterns, and music. Some have thought that maintenance training and Accelerated Learning have nothing in common. Recent training applications by industry and education of Accelerated Learning are proving very successful by several standards. This paper cites available resource examples and challenges maintenance trainers to adopt new ideas and concepts to accelerate learning in all training setting. 7 refs.

  14. Site Management Guide (Blue Book)

    SciTech Connect (OSTI)

    2014-03-01

    The U.S. Department of Energy (Department) Office of Legacy Management (LM), established in 2003, manages the Department’s postclosure responsibilities and ensures the future protection of human health and the environment. During World War II and the Cold War, the Federal government developed and operated a vast network of industrial facilities for the research, production, and testing of nuclear weapons, as well as other scientific and engineering research. These processes left a legacy of radioactive and chemical waste, environmental contamination, and hazardous facilities and materials at well over 100 sites. Since 1989, the Department has taken an aggressive accelerated cleanup approach to reduce risks and cut costs. At most Departmental sites undergoing cleanup, some residual hazards will remain at the time cleanup is completed due to financial and technical impracticality. However, the Department still has an obligation to protect human health and the environment after cleanup is completed. LM fulfills DOE’s postclosure obligation by providing long-term management of postcleanup sites which do not have continuing missions. LM is also responsible for sites under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Currently, the U.S. Army Corps of Engineers (USACE) is responsible for site surveys and remediation at FUSRAP sites. Once remediation is completed, LM becomes responsible for long-term management. LM also has responsibility for uranium processing sites addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). UMTRCA Title II sites are sites that were commercially owned and are regulated under a U.S. Nuclear Regulatory Commission (NRC) license. For license termination, the owner must conduct an NRC-approved cleanup of any on-site radioactive waste remaining from former uranium ore-processing operations. The site owner must also provide full funding for inspections and, if necessary, ongoing maintenance. Once site cleanup is complete, LM accepts title to these sites on behalf of the United States and assumes long-term management.

  15. General Engineer

    Broader source: Energy.gov [DOE]

    This position is located in Office of Standard Contract Management, within the Office of the General Counsel (GC). The purpose of the position is to conduct technical and engineering reviews of the...

  16. Davis PV plant operation and maintenance manual

    SciTech Connect (OSTI)

    1994-09-01

    This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

  17. ICD Complex Operations and Maintenance Plan

    SciTech Connect (OSTI)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  18. Standard hydrogen monitoring system - E operation and maintenance manual

    SciTech Connect (OSTI)

    Schneider, T.C.

    1997-06-01

    The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System- E (SHMS-E) used in the 200E and 20OW area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course for SHMS, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted.

  19. Site Risks:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - IM: BeckyLaura) o Hanford site traffic status update: Weather - who decides the roads ... assumptions? o Waste processing Decommissioning and Decontamination workers - ...

  20. Human Factors/Ergonomics Handbook for the Design for the Ease of Maintenance

    Energy Savers [EERE]

    113 3.0 WORKSPACE, STORAGE, AND WORKSHOP DESIGN 3.1 Workspace and operations in non-workshop areas 3.1.1 Workspace 3.1.1.1 General Maintenance clearance. To provide adequate clearance for maintainers and to provide sufficient space to accommodate tools, test equipment, procedures, and other job aids during an in-place repair, a nominal 914 mm (36 in.) maintenance clearance should be provided around all major system components and piping of 610 mm (24 in.) diameter and larger. 3.1.1.1 Console

  1. General Employee Radiological Training

    Energy Savers [EERE]

    _______ Change Notice 1 June 2009 DOE HANDBOOK GENERAL EMPLOYEE RADIOLOGICAL TRAINING U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Not Measurement Sensitive This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ Change 1 DOE-HDBK-1131-2007 Original Change Part 2 page 5 The average annual radiation dose to a

  2. General Employee Radiological Training

    Energy Savers [EERE]

    DOE HANDBOOK GENERAL EMPLOYEE RADIOLOGICAL TRAINING U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Not Measurement Sensitive This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ DOE-HDBK-1131-2007 iii Foreword This Handbook describes an implementation process for core training as recommended in chapter 14,

  3. Arizona Department of Environmental Quality's General Permits...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Web Site: Arizona Department of Environmental Quality's General Permits Website Abstract This website provides information...

  4. GENERAL ASSIGNMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    GEA's National Geothermal Summit 2016 GEA's National Geothermal Summit 2016 June 7, 2016 8:00AM EDT to June 8, 2016 5:00PM EDT GEA's National Geothermal Summit 2016 Reno, Nevada http://www.geo-energy.org/nationalgeothermalsummit/main.aspx

    GENERAL ASSIGNMENT KNOW ALL MEN BY THESE PRESENTS, that ___________________________________, a corporation organized and existing under the laws of the State of ________________________, with its principal place of business at

  5. Titanium addition practice, and maintenance for the hearths in AHMSA`s blast furnaces

    SciTech Connect (OSTI)

    Boone, A.G.; Jimenez, G.; Castillo, J.

    1997-12-31

    Altos Hornos de Mexico (AHMSA) is a steel company located in Northern Mexico, in the state of Coahuila. Currently there are three blast furnaces in operation and one more about to finish its general repair. This last one is to remain as a back-up unit. Because of blast furnace hearth wear outs AHMSA has developed some maintenance procedures. These procedures are based on titanium ore additions and hearth thermic control monitoring. There are also some other maintenance practices adopted to the working operations to assure that such operations detect and avoid in time hearth wear outs that place personnel and/or the unit in danger (due to hearth leaks). This paper describes titanium ore addition to No. 2 blast furnace during the final campaign and it also illustrates maintenance practices and continuous monitoring of temperature trends both of which were implemented at AHMSA`s No. 5 blast furnace.

  6. Enhanced human performance of utility maintenance programs

    SciTech Connect (OSTI)

    Fresco, A.; Haber, S.; O`Brien, J.

    1993-08-01

    Assuring the safe operation of a nuclear power plant depends, to a large extent, on how effectively one understands and manages the aging-related degradation that occurs in structures, systems, and components (SSCs). Aging-related degradation is typically managed through a nuclear plant`s maintenance program. A review of 44 Maintenance Team Inspection (MTI) Reports indicated that while some plant organizations appeared to assume a proactive mode in preventing aging-related failures of their SSCs important to safety, others seemed to be taking a passive or reactive mode. Across all plants, what is clearly needed, is a strong recognition of the importance of aging-related degradation and the use of existing organizational assets to effectively detect and mitigate those effects. Many of those assets can be enhanced by the consideration of organizational and management factors necessary for the implementation of an effective aging management program. This report provides a discussion of this program.

  7. Washington Energy Facility Site Evalutation Council - Siting...

    Open Energy Info (EERE)

    Reference LibraryAdd to library Web Site: Washington Energy Facility Site Evalutation Council - Siting and Review Process Abstract Overview of the siting and review process for...

  8. CB-EMIS MAINTENANCE MONITORING SYSTEM

    Energy Science and Technology Software Center (OSTI)

    2006-10-01

    This system continuously monitors all components of a CB-EMIS (ANL-02-078)installation such as signals for video cameras, detector, train data, meteorological data, computer and network equipment and reports exceptions to maintenance staff so that corrections can be made as soon as possible. This monitoring system is built within Nagios (www.nagios.org), a free open source host service and network monitoring program.

  9. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  10. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  11. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013, supersedes DOE O 433.1B.

  12. Feasibility study for a transportation operations system cask maintenance facility

    SciTech Connect (OSTI)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  13. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Year-End Summary Report Long-Term Surveillance Operations and Maintenance Fiscal Year ... PDF icon Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End ...

  14. Operations and Maintenance in Federal Facilities | Department of Energy

    Energy Savers [EERE]

    Operations and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as this water recovery- and recycling-type pump, works properly over the long term. Effective operations and maintenance plans help ensure federal equipment, such as this water recovery- and recycling-type pump, works properly over the long term. Federal facilities rely on pumps, motors, fans, and other mechanical systems

  15. FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting

    Energy Savers [EERE]

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2013 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY_09_DM_RM_AM_Reporting_Memo_and_attachment_072009.pdf Real Property Maintenance Reporting Requirement

  16. HANFORD SITE WELDING PROGRAM SUCCESSFULLY PROVIDING A SINGLE SITE FUNCTION FOR USE BY MULTIPLE CONTRACTORS

    SciTech Connect (OSTI)

    CANNELL GR

    2009-11-19

    The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

  17. Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gov Inslee Tours WTP and TF Gov Inslee Tours WTP and TF Groundwater Groundwater Groundwater Treatment Record Groundwater Treatment Record Groundwater Treatment Resin Groundwater Treatment Resin HAMMER Site-Wide Safety Standards HAMMER Site-Wide Safety Standards Helicopter Removes Truck on ALE Helicopter Removes Truck on ALE Highly Radioactive Sludge Removal Complete Highly Radioactive Sludge Removal Complete HSS Beryllium Out Brief HSS Beryllium Out Brief Improving Access to Tank C-107 Improving

  18. Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Washington Closure Job Creation Job Creation Waste Site Sampling Waste Site Sampling Borescope Borescope ERDF Pull Boxes ERDF Pull Boxes Super Cell 9 Winter Construction Super Cell 9 Winter Construction Cone Penetrometer Display Cone Penetrometer Display Touching Lives Touching Lives Super Cell 9 Construction Super Cell 9 Construction Super Cell 9 Super Cell 9 Cone Penetrometers Cone Penetrometers New Bulldozers New Bulldozers Subcontractor Worker Subcontractor Worker "Green"

  19. Site Map

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home » Site Map Site Map Home About Overview NERSC Mission Contact us Staff Center Leadership Sudip Dosanjh Sudip Dosanjh: Select Publications Jeff Broughton Katie Antypas Richard Gerber Publications John Shalf Center Administration James Craw Norma Early Jeff Grounds Betsy MacGowan Zaida McCunney Kerri Peyovich Lynn Rippe David Tooker Center Communications Jon Bashor Kathy Kincade Linda Vu Margie Wylie Advanced Technologies Nicholas Wright Brian Austin Research Projects Christopher Daley Glenn

  20. Site Map

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Information Kansas City National Security Campus (NSC), located in Kansas City, Mo., is the principal nonnuclear production site within the nuclear weapons complex, responsible for manufacturing and procuring nonnuclear components for nuclear weapons, including electronic, mechanical, and engineered material components. It supports national laboratories, universities, and U.S. industry. Work for other federal agencies is also conducted at NSC in a variety of national security programs.

  1. UPDES Storm Water Permits: General Construction Website | Open...

    Open Energy Info (EERE)

    Storm Water Permits: General Construction Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: UPDES Storm Water Permits: General Construction...

  2. Data collection system. Volume 1, Overview and operators manual; Volume 2, Maintenance manual; Appendices

    SciTech Connect (OSTI)

    Caudell, R.B.; Bauder, M.E.; Boyer, W.B.; French, R.E.; Isidoro, R.J.; Kaestner, P.C.; Perkins, W.G.

    1993-09-01

    Sandia National Laboratories (SNL) Instrumentation Development Department was tasked by the Defense Nuclear Agency (DNA) to record data on Tektronix RTD720 Digitizers on the HUNTERS TROPHY field test conducted at the Nevada Test Site (NTS) on September 18, 1992. This report contains a overview and description of the computer hardware and software that was used to acquire, reduce, and display the data. The document is divided into two volumes: an overview and operators manual (Volume 1) and a maintenance manual (Volume 2).

  3. Hanford Site Tours - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tours Hanford Site Tours Hanford Tour Restrictions Hanford Site Tours Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size The Hanford Site is a very unique place offering a number of tours for members of the public, elected officials and their staffs, tribal officials, stakeholders, and others. A list of the kinds of Hanford tours we provide is shown below, along with links to register for the tour or a contact person to call for more information on how to sign up.

  4. Hanford Blog Archive - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 2013 March 20, 2013 PHOTOS: Washington State Attorney General Bob Ferguson Visits Hanford Washington State Attorney General Bob Ferguson makes his first visit to Hanford. March 20, 2013 Firefighters at the Hanford Site Participate in Annual Leukemia & Lymphoma Society Event Firefighters from the Hanford Site recently raised $21,699.86 to benefit this worthwhile cause. March 14, 2013 DOE, City of Richland and Benton PUD Increase Fiber Optic Telecommunication Capacity in Benton County

  5. INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY 2005

    SciTech Connect (OSTI)

    D. R. Fitch

    2005-09-22

    This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during fiscal year 2005. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document. Waste Area Groups 7 and 8 are not reported in this document. Waste Area Group 7 is an operating facility, and the status of its operations is reported directly to the regulatory agencies. Waste Area Group 8 is excluded from this report, because it falls outside the direct control of U.S. Department of Energy Idaho Operations Office. The INEEL Sitewide Institutional Controls Plan discusses the inspection, maintenance, repair, and reporting activities involving institutional controls at the Idaho National Laboratory Site. Therefore, the maintenance of institutional controls is not discussed in this report. The Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan provides a reference to support this report by providing current and projected facility and land uses and by listing the Comprehensive Environmental Response, Compensation, and Liability Act sites.

  6. Review of maintenance personnel practices at nuclear power plants

    SciTech Connect (OSTI)

    Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

    1984-05-01

    As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations.

  7. Online Monitoring to Enable Improved Diagnostics, Prognostics and Maintenance

    SciTech Connect (OSTI)

    Bond, Leonard J.

    2011-02-01

    For both existing and new plant designs there are increasing opportunities and needs for the application of advanced online surveillance, diagnostic and prognostic techniques. These methods can continuously monitor and assess the health of nuclear power plant systems and components. The added effectiveness of such programs has the potential to enable holistic plant management, and minimize exposure to future and unknown risks. The 'NDE & On-line Monitoring' activities within the Advanced Instrumentation, Information and Control Systems (II&CS) Pathway are developing R&D to establish advanced condition monitoring and prognostics technologies to understand and predict future phenomena, derived from plant aging in systems, structures, and components (SSC). This research includes utilization of the enhanced functionality and system condition awareness that becomes available through the application of digital technologies at existing nuclear power plants for online monitoring and prognostics. The current state-of-the-art for on-line monitoring applied to active components (eg pumps, valves, motors) and passive structure (eg core internals, primary piping, pressure vessel, concrete, cables, buried pipes) is being reviewed. This includes looking at the current deployment of systems that monitor reactor noise, acoustic signals and vibration in various forms, leak monitoring, and now increasingly condition-based maintenance (CBM) for active components. The NDE and on-line monitoring projects are designed to look beyond locally monitored CBM. Current trends include centralized plant monitoring of SSC, potential fleet-based CBM and technology that will enable operation and maintenance to be performed with limited on-site staff. Attention is also moving to systems that use online monitoring to permit longer term operation (LTO), including a prognostic or predictive element that estimates a remaining useful life (RUL). Many, if not all, active components (pumps, valves, motors etc.) can be well managed, routinely diagnosed, analyzed and upgraded as needed using a combination of periodic and online CBM. The ability to successfully manage passive systems and structures is seen as the key to LTO, particularly in the USA. New approaches will be demonstrated, including prognostics for passive structures, which is critical to maintaining safety and availability and to reducing operations and maintenance costs for NPP's. To provide proactive on-line monitoring that includes estimates for RUL new projects will include advanced sensors, better understanding of stressors and challenges faced in quantification of uncertainty associated with RUL. This program area will leverage insights from past experience in other industries and seek to demonstrate the feasibility of on-line monitoring and prognostics to support NPP LTO.

  8. INL SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS

    SciTech Connect (OSTI)

    JOLLEY, WENDELL L

    2008-02-05

    On November 9, 2002, the U.S. Environmental Protection Agency, the U.S. Department of Energy, and the Idaho Department of Environmental Quality approved the 'Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites', which required a Site-wide institutional controls plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. This revision identifies and consolidates the institutional controls and operations and maintenance requirements into a single document.

  9. Year 2000 TWRS Maintenance procedure review report

    SciTech Connect (OSTI)

    ADAMS, M.R.

    1999-02-24

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K.

  10. Converting urban tree maintenance residue to energy

    SciTech Connect (OSTI)

    Murphey, W.K.; Massey, J.G.; Sumrall, A.

    1980-01-01

    Three methods of utilizing urban wood waste collected by a tree maintenance firm in Houston, Texas (handling 30,000 ton waste/year) are examined: (a) hauling to a remote landfill; (b) chipping and hauling to a (local) power plant and converting to electricity; and (c) chipping and selling to an outside firm for use as boiler fuel. Breakdown of costs are given for each method in monetary and energy terms. Method (b) was the cheapest, producing a net energy gain (870 million Btu/day), but the firm chose method (c), since it realized a direct monetary return.

  11. Plant maintenance and outage management issue, 2005

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2005-01-15

    The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

  12. Natural resources management activity and biodiversity maintenance

    SciTech Connect (OSTI)

    Caudell, M.B.

    1993-05-01

    Activities in coordinating land use for the Savannah River Site public lands during the period of July 1, 1992 to June 30, 1993 are reported.

  13. State Generation & Transmission Siting Directory | Open Energy...

    Open Energy Info (EERE)

    Directory Jump to: navigation, search OpenEI Reference LibraryAdd to library General: State Generation & Transmission Siting Directory Abstract A guide of generation and...

  14. Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.

    SciTech Connect (OSTI)

    Peters, Valerie A.; Ogilvie, Alistair; Veers, Paul S.

    2009-09-01

    This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a list of the data needed to support reliability and availability analysis, and gives specific recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of fielded wind turbines. This report is intended to help the reader develop a basic understanding of what data are needed from a Computerized Maintenance Management System (CMMS) and other data systems, for reliability analysis. The report provides: (1) a list of the data needed to support reliability and availability analysis; and (2) specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and a wider variety of analysis and reporting needs.

  15. Independent Activity Report, Los Alamos Site Office - April 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Site Office - April 2012 Independent Activity Report, Los Alamos Site Office - April 2012 April 2012 Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment [HIAR-LANL-2011-11-18] This Independent Activity Report documents an oversight activity conducted by Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations November 14-18, 2011, at the Los Alamos National Laboratory. The activity consisted of a

  16. Nevada Test Site Environmental Report 2008 Attachment A: Site Description

    SciTech Connect (OSTI)

    Cathy A. Wills

    2009-09-01

    This attachment expands on the general description of the Nevada Test Site (NTS) presented in the Introduction to the Nevada Test Site Environmental Report 2008 (National Security Technologies, LLC [NSTec], 2009a). Included are subsections that summarize the sites geological, hydrological, climatological, and ecological setting. The cultural resources of the NTS are also presented. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NTS. An adequate knowledge of the sites environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NTS. The NTS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NTS operations. These key features include the general remote location of the NTS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  17. Nevada Test Site Environmental Report 2009, Attachment A: Site Description

    SciTech Connect (OSTI)

    Cathy Wills, ed.

    2010-09-13

    This attachment expands on the general description of the Nevada Test Site (NTS) presented in the Introduction to the Nevada Test Site Environmental Report 2009. Included are subsections that summarize the sites geological, hydrological, climatological, and ecological setting. The cultural resources of the NTS are also presented. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NTS. An adequate knowledge of the sites environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NTS. The NTS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NTS operations. These key features include the general remote location of the NTS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  18. Site Map

    Office of Scientific and Technical Information (OSTI)

    Site Map Expand All | Collapse All Item Sir John Pople, Gaussian Code, and Complex Chemical Reactions Item DOE Research and Development Accomplishments Click to expand or collapse folder Folder DOE Research and Development Accomplishments About Item The Manhattan Project Click to expand or collapse folder Folder DOE Research and Development Accomplishments Alfred Nobel Laureates Associated with the DOE and Predecessors Item Abdus Salam and his International Influences Item Ahmed Zewail and

  19. Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photo Gallery Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Welcome The Department of Energy's Photo Gallery consists of collections of photographs relevant to the history, operation, and clean up of the Hanford Site in Richland, Washington. These photo collections can be easily paged through, searched, downloaded, and printed. If, as viewing these galleries, you have additional information on people or places, you can submit that information on the

  20. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Office of Legacy Management (LM)

    Rifle, Colorado Page 14-1 14.0 Rifle, Colorado, Disposal Site 14.1 Compliance Summary The Rifle, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on June 30, 2015. The disposal cell and all associated surface-water diversion and drainage structures were in good condition and functioning as designed. Vegetation on the site was in excellent condition. Minor fence repairs and perimeter sign maintenance will be conducted prior to the next inspection.

  1. EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.; Mitchell, E.

    2011-01-18

    The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

  2. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1991-06-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the fourth quarter of 1990. It includes the analytical data, field data, well activity data, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of analytical and other data, maintenance of the databases containing groundwater monitoring data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  3. The Savannah River Site's Groundwater Monitoring Program

    SciTech Connect (OSTI)

    Not Available

    1990-10-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the first quarter of 1990. It includes the analytical data, field data, well activity data, and the other documentation for this program and provides a record of the program's activities and rationale and an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of the analytical data and other data, maintenance of the databases containing groundwater monitoring data and related data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  4. An automated neutron monitor maintenance system

    SciTech Connect (OSTI)

    Moore, F.S.; Griffin, J.C.; Odell, D.M.C.

    1996-09-01

    Neutron detectors are commonly used by the nuclear materials processing industry to monitor fissile materials in process vessels and tanks. The proper functioning of these neutron monitors must be periodically evaluated. We have developed and placed in routine use a PC-based multichannel analyzer (MCA) system for on-line BF3 and He-3 gas-filled detector function testing. The automated system: 1) acquires spectral data from the monitor system, 2) analyzes the spectrum to determine the detector`s functionality, 3) makes suggestions for maintenance or repair, as required, and 4) saves the spectrum and results to disk for review. The operator interface has been designed to be user-friendly and to minimize the training requirements of the user. The system may also be easily customized for various applications

  5. Long-Term Surveillance and Maintenance Program

    Office of Legacy Management (LM)

    ... mild. The wind at the Shiprock site blows most frequently from the southeast in summer and from the west in winter. On an annual basis, the most frequent wind direction is ...

  6. Operations and Maintenance Savings from Advanced Metering Infrastructure - Initial Results

    Energy Savers [EERE]

    Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide The Federal Energy Management Program's Operations and Maintenance (O&M) Best Practices Guide outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Following these best practices can help agencies gain management buy-in for O&M programs and save an estimated 5% to 20% on energy bills without a significant capital

  7. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintaining Your Air Conditioner Maintaining Your Air Conditioner Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. An air conditioner's filters, coils, and fins require regular maintenance for the unit to function effectively and efficiently throughout its years of service. Neglecting necessary

  8. DOE-STD-1181-2004; Facility Maintenance Management Functional...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... maintenance management personnel shall demonstrate a working level knowledge of industrial property management practices as related to stores, spare parts, and essential materials. ...

  9. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in an efficient manner and that operations and maintenance personnel are well trained. ... or system (lumens per watt) Energy management system - A microprocessor-based system ...

  10. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    SciTech Connect (OSTI)

    Hendrickson, D.W. [ed.

    1995-03-14

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

  11. Color Maintenance of LEDs in Laboratory and Field Applications...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: LED, ssl, solid-state, lighting, GATEWAY, CALiPER, report, color, shift, maintenance Word Cloud More Like This Full ...

  12. Color Maintenance of LEDs in Laboratory and Field Applications...

    Office of Scientific and Technical Information (OSTI)

    Royer, Michael P.; Tuttle, Ralph; Rosenfeld, Scott M.; Miller, Naomi J. Light-emitting diode (LED), color shift, color stability, color maintenance, warranty Light-emitting...

  13. Community Wind Handbook/Plan for Maintenance | Open Energy Information

    Open Energy Info (EERE)

    Community Wind HandbookPlan for Maintenance < Community Wind Handbook Jump to: navigation, search WIND ENERGY STAKEHOLDER ENGAGEMENT & OUTREACHCommunity Wind Handbook...

  14. Operations and Maintenance Best Practices--A Guide to Achieving...

    Office of Scientific and Technical Information (OSTI)

    This guide is designed to serve as a source for O&M management and technical staff. It ... OPERATION; EFFICIENCY; MAINTENANCE; MANAGEMENT; RECOMMENDATIONS Word Cloud More Like ...

  15. ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE

    SciTech Connect (OSTI)

    Trapp, D.

    2014-08-25

    The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

  16. Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of 06934566 .l\ ~ ~ ~~9 u.s. Department of Energy Hanford Site OEC 2 8 2004 04-0RP-O78 Mr. Todd Martin, Chair Hanford Advisory Board 1933 Jadwin Avenue, Suite 135 Rich1and, Washington 99352 Dear Mr. Martin: HANFORD ADVISORY BOARD (HAB) CONSENSUS ADVICE #167 -STOP WORK AUTHORITY Reference: HAB letter from T. Martin to P. Golan and J. Shaw, DOE-HQ; K. Klein, RL; R. Schepens, ORP; L. Hoffman, Ecology; and R. Kreizeneeck, EPA, "Stop Work Authority," dated November 5, 2004. This letter

  17. Nevada Test Site Environmental Report 2005, Attachment A - Site Description

    SciTech Connect (OSTI)

    Cathy A. Wills

    2006-10-01

    This appendix to the ''Nevada Test Site Environmental Report 2005'', dated October 2006 (DOE/NV/11718--1214; DOE/NV/25946--007) expands on the general description of the Nevada Test Site (NTS) presented in the Introduction. Included are subsections that summarize the site?s geological, hydrological, climatological, and ecological setting. The cultural resources of the NTS are also presented. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NTS. An adequate knowledge of the site's environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NTS. The NTS environment contributes to several key features of the site which afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NTS operations. These key features include the general remote location of the NTS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This appendix complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  18. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    A: Hydrologic Data A.1 Surface-Water Discharge Data A.1.1 GS01: Woman Creek at Indiana Street A.1.2 GS03: Walnut Creek at Indiana Street A.1.3 WOMPOC: Woman Creek at Eastern COU Boundary A.1.4 WALPOC: Walnut Creek at Eastern COU Boundary A.1.5 GS05: Woman Creek at West Fenceline A.1.6 GS08: South Walnut Creek at Pond B-5 Outlet A.1.7 GS10: South Walnut Creek at B-1 Bypass A.1.8 GS11: North Walnut Creek at Pond A-4 Outlet A.1.9 GS12: North Walnut Creek at Pond A-3 Outlet A.1.10 GS13: North Walnut

  19. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    96 Table 33. Sampling and Data Evaluation Protocols at Predischarge Monitoring Locations Location Code Location Description Sample Types/ Frequencies Analytes Data Evaluation A4 POND Pond A-4 at east end of pond near outlet works Prior to opening outlet valve Pu, Am, total U, nitrate a Review with regulators prior to initiating discharge B5 POND Pond B-5 at east end of pond near outlet works Prior to opening outlet valve Pu, Am, total U, nitrate a Review with regulators prior to initiating

  20. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    73 3.1.4 Surface-Water Data Interpretation and Evaluation 3.1.4.1 Surface-Water Quality Summaries This section presents water quality summaries for selected analytes for the period January 1, 1997, through December 31, 2015 (CYs 1997-2015) for the automated surface-water monitoring locations collecting flow-paced composite samples in CY 2015. Radionuclides summarized include Pu, Am, 12 and total U. The POE metals (total Be, dissolved Cd, total Cr, and dissolved Ag) and nitrate+nitrite as N are

  1. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    262 Notes: Pie chart diameters are relative to total load. Figure 192. Relative Average Annual Total U Loads from Former IA Drainages and WWTP 3.1.5 Groundwater Data Interpretation and Evaluation This section provides a summary of groundwater monitoring performed in 2015. A discussion of groundwater conditions during 2015, focusing on the most important water-quality aspects in the areas of interest (i.e., the main contaminant plumes), is then presented. 3.1.5.1 RFLMA Groundwater Monitoring

  2. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    396 S-K trending results (Table 75) indicate an increasing trend meeting the 95 percent level of confidence for nitrate in samples from well 37405 and for U in samples from well 37505, and a decreasing trend of the same significance for uranium at well 37405. The associated trend plots are provided in Appendix B. Areas Monitored for Plutonium and Americium: Groundwater immediately downgradient of the former B371 and B771 complexes is monitored for Pu and Am. Abundant technical research (much of

  3. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    7 include annual weed distribution data (for selected species), annual weed control locations, biocontrol release locations, vegetation and wildlife monitoring locations (transect endpoints and sample points), vegetation community classifications, Preble's mouse habitat, wetland locations, wildfire/prescribed burn locations, Preble's mouse and wetland mitigation areas, and rare plant locations. These data are available in various ArcGIS-compatible formats. In addition to these types of spatial

  4. Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.

    SciTech Connect (OSTI)

    Peters, Valerie A.; Ogilvie, Alistair B.

    2012-01-01

    This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific data recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of operating wind turbines. This report is intended to help develop a basic understanding of the data needed for reliability analysis from a Computerized Maintenance Management System (CMMS) and other data systems. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and analysis and reporting needs. The 'Motivation' section of this report provides a rationale for collecting and analyzing field data for reliability analysis. The benefits of this type of effort can include increased energy delivered, decreased operating costs, enhanced preventive maintenance schedules, solutions to issues with the largest payback, and identification of early failure indicators.

  5. Environmental assessment: Davis Canyon site, Utah

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considering for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has found that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of five sites suitable for characterization.

  6. Nevada Test Site Environmental Report 2007 Attachment A: Site Description

    SciTech Connect (OSTI)

    Cathy Wills

    2008-09-01

    This appendix expands on the general description of the Nevada Test Site (NTS) presented in the Introduction to the Nevada Test Site Environmental Report 2007 (U.S. Department of Energy [DOE], 2008). Included are subsections that summarize the site's geological, hydrological, climatological, and ecological setting. The cultural resources of the NTS are also presented. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NTS. An adequate knowledge of the site's environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NTS. The NTS environment contributes to several key features of the site which afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NTS operations. These key features include the general remote location of the NTS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

  7. Hanford Site Voluntary Protection Program - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Voluntary Protection Program Hanford Site Voluntary Protection Program Hanford Site Voluntary Protection Program VPP Home VPP Hanford Site Champions Committee Getting Started Maintaining STAR VPP Communications VPP Conferences Hanford Site Voluntary Protection Program Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size 2013 VPPPA Outreach Award Winners VPP Committee Business Case (PDF)

  8. 1994 Site Environmental Report

    SciTech Connect (OSTI)

    1995-05-01

    The 1994 Site Environmental Report summarizes environmental activities at Lawrence Berkeley Laboratory (LBL) for the calendar year (CY) 1994. The report strives to present environmental data in a manner that characterizes the performance and compliance status of the Laboratory`s environmental management programs when measured against regulatory standards and DOE requirements. The report also discusses significant highlight and planning efforts of these programs. The format and content of the report are consistent with the requirements of the US Department of Energy (DOE) Order 5400.1, General Environmental Protection Program.

  9. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  10. 1992 Fernald Site Environmental Report

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The Fernald site is a Department of Energy (DOE) owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the Fernald site in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This report covers the reporting period from January 1, 1992, through December 31, 1992, with the exception of Chapter Three, which provides information from the first quarter of 1993 as well as calendar year 1992 information. This 1992 report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Use included in this report are summary data of the sampling conducted to determine if the site complies with DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA) requirements. Finally, this report provides general information on the major waste management and environmental restoration activities during 1992.

  11. Wind loading on solar concentrators: some general considerations

    SciTech Connect (OSTI)

    Roschke, E. J.

    1984-05-01

    A survey has been completed to examine the problems and complications arising from wind loading on solar concentrators. Wind loading is site specific and has an important bearing on the design, cost, performance, operation and maintenance, safety, survival, and replacement of solar collecting systems. Emphasis herein is on paraboloidal, two-axis tracking systems. Thermal receiver problems also are discussed. Wind characteristics are discussed from a general point of view; current methods for determining design wind speed are reviewed. Aerodynamic coefficients are defined and illustrative examples are presented. Wind tunnel testing is discussed, and environmental wind tunnels are reviewed; recent results on heliostat arrays are reviewed as well. Aeroelasticity in relation to structural design is discussed briefly. Wind loads, i.e., forces and moments, are proportional to the square of the mean wind velocity. Forces are proportional to the square of concentrator diameter, and moments are proportional to the cube of diameter. Thus, wind loads have an important bearing on size selection from both cost and performance standpoints. It is concluded that sufficient information exists so that reasonably accurate predictions of wind loading are possible for a given paraboloidal concentrator configuration, provided that reliable and relevant wind conditions are specified. Such predictions will be useful to the design engineer and to the systems engineer as well. Information is lacking, however, on wind effects in field arrays of paraboloidal concentrators. Wind tunnel tests have been performed on model heliostat arrays, but there are important aerodynamic differences between heliostats and paraboloidal dishes.

  12. Maintenance Plan Site A and Plot M Palos Forest Preserve, Cook...

    Office of Legacy Management (LM)

    ... of Legacy Management, Grand Junction, Colorado. ... USGS (U.S. Geological Survey), 1984. Low-Level Radioactive-Waste Burial at ... and Inspection Checklist This page ...

  13. Long-Term Surveillance and Maintenance at the Rocky Flats Site...

    Energy Savers [EERE]

    as a buffer zone surrounding the former industrial area, was transferred to the U.S. Fish and Wildlife Service in July 2007 for a national wildlife refuge. DOE's Office of...

  14. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1990

    SciTech Connect (OSTI)

    Not Available

    1991-06-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the fourth quarter of 1990. It includes the analytical data, field data, well activity data, and other documentation for this program, provides a record of the program`s activities and rationale, and serves as an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of analytical and other data, maintenance of the databases containing groundwater monitoring data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  15. The Savannah River Site`s Groundwater Monitoring Program. First quarter, 1990

    SciTech Connect (OSTI)

    Not Available

    1990-10-18

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the first quarter of 1990. It includes the analytical data, field data, well activity data, and the other documentation for this program and provides a record of the program`s activities and rationale and an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of the analytical data and other data, maintenance of the databases containing groundwater monitoring data and related data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

  16. Hanford Site Safety Standards - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (DOE) Office of Health, Safety and Security (HSS) Corrective Action Plan Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP) DOE-0342, Hanford Site Chronic Beryllium...

  17. Hanford Site Wide Programs - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Page | Print Print Page |Text Increase Font Size Decrease Font Size Hanford Site-Wide Programs Hanford Safety and Health Hanford Site Wide Programs Hanford Fire Department...

  18. Liquid sodium dip seal maintenance system

    DOE Patents [OSTI]

    Briggs, Richard L.; Meacham, Sterling A.

    1980-01-01

    A system for spraying liquid sodium onto impurities associated with liquid dip seals of nuclear reactors. The liquid sodium mixing with the impurities dissolves the impurities in the liquid sodium. The liquid sodium having dissolved and diluted the impurities carries the impurities away from the site thereby cleaning the liquid dip seal and surrounding area. The system also allows wetting of the metallic surfaces of the dip seal thereby reducing migration of radioactive particles across the wetted boundary.

  19. A = 5 General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 General Tables The General Table for 5H is subdivided into the following categories: Cluster Model Hypernuclei Model Calculations Photodisintegration Pions The General Table for...

  20. Brookhaven National Laboratory site environmental report for calendar year 1993

    SciTech Connect (OSTI)

    Naidu, J.R.; Royce, B.A.

    1994-05-01

    This report documents the results of the Environmental Monitoring Program at BNL and presents summary information about environmental compliance for 1993. To evaluate the effect of BNL operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, ground water and vegetation were made at the BNL site and at sites adjacent to the Laboratory. Brookhaven National Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions to the environment were evaluated. Among the permitted facilities, two instances, of pH exceedances were observed at recharge basins, possible related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant (STP) to the Peconic River exceeded on five occasions, three for residual chlorine and one each for iron and ammonia nitrogen. The chlorine exceedances were related to a malfunctioning hypochlorite dosing pump and ceased when the pump was repaired. While the iron and ammonia-nitrogen could be the result of disturbances to the sand filter beds during maintenance. The environmental monitoring data has identified site-specific contamination of ground water and soil. These areas are subject to Remedial Investigation/Feasibility Studies (RI/FS) under the Inter Agency Agreement (IAG). Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with applicable environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at BNL are minimal and pose no threat to the public or to the environment. This report meets the requirements of DOE Orders 5484. 1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

  1. Site Map | DOE Patents

    Office of Scientific and Technical Information (OSTI)

    DOepatents Site Map Site Map Home Basic Search Advanced Search DOEPatents FAQ About DOEpatents Site Map DOEpatents Feedback Website Policies/Important Links

  2. Site Map | Data Explorer

    Office of Scientific and Technical Information (OSTI)

    Site Map Site Map Home Basic Search Advanced Search Data Explorer FAQ About Data Explorer Site Map Data Explorer Feedback Website Policies/Important Links

  3. Site Map | Geothermal

    Office of Scientific and Technical Information (OSTI)

    Site Map Site Map Home Basic Search Advanced Search Geothermal FAQ About Geothermal Site Map Geothermal Feedback Website PoliciesImportant Links

  4. Hopper scheduled maintenance tomorrow (Sept 19) and /project outage

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and /project outage Hopper scheduled maintenance tomorrow (Sept 19) and /project outage September 18, 2012 by Helen He There will be a scheduled hardware and software maintenance for Hopper next Wednesday, Sept 19, from 6:30 am to midnight Pacific time. Please plan your work accordingly and check the NERSC Message of the Day (MOTD) for status update: http://www.nersc.gov/live-status/motd/. The /project file system (also known as /global/project) will be

  5. Maintenance study for W-340 Waste Retrieval System

    SciTech Connect (OSTI)

    Christensen, C.; Conner, C.C.; Sekot, J.P.

    1994-05-01

    This study was performed to identify attributes and maintainability requirements for the Tank Waste Retrieval System (TWRS). The system will be developed for Westinghouse Hanford Company in Richland, Washington, as an integrated system to perform waste removal in Tank C-106 and, thus, demonstrate technologies for tank remediation that will satisfy requirements of the Tri-Party Agreement. The study examines attributes of the TWRS, scope of maintenance operations required for the TWRS, maintenance requirements, and potential methods of performing maintenance functions. Recommendations are provided for consideration in the development of both the conceptual design and performance specification, which will be used in procuring the W-340 Waste Retrieval System.

  6. 8C General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C General Tables The General Table for 8C is subdivided into the following categories: Reviews Other Theoretical Work

  7. 6Be General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6Be General Table The General Table for 6Be is subdivided into the following categories: Cluster Model Model Calculations...

  8. Visitor Control / Site Access - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us Hanford Site Wide Programs Visitor Control / Site Access About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us Visitor Control / Site Access Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Planning to come to the Hanford Site? Map of Hanford Map of Hanford If you are planning on coming to Hanford as part of a job assignment, tour, or event, you need to be familiar with the requirements and restrictions associated with being

  9. Hanford Site Cleanup Completion Framework - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Documents Hanford Site Cleanup Completion Framework Documents Documents Hanford Site Cleanup Completion Framework Tri-Party Agreement Freedom of Information and Privacy Act Hanford Site Budget Hanford Site Safety Standards DOE - ORP Contracts/Procurements DOE - RL Contracts/Procurements Integrated Waste Feed Delivery Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RI/FS Sitewide Probabilistic Seismic Hazard Analysis Environmental Hanford Site Cleanup Completion Framework Email Email

  10. VPP Hanford Site Champions Committee - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Champions Committee Hanford Site Voluntary Protection Program VPP Home VPP Hanford Site Champions Committee Who We Are Annual Reports Assessments Getting Started Maintaining STAR VPP Communications VPP Conferences VPP Hanford Site Champions Committee Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size VPP Hanford Site Champions Committee VPP Committee VPP Champions Committee Charter (PDF) Business Case (PDF) VPP Champions Committee Roster (PDF) Share on

  11. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    this guide is to provide you, the Operations and Maintenance (O&M)Energy manager and practitioner, with useful information about O&M management, technologies, energy and water ...

  12. Planning and Reporting for Operations and Maintenance in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Allocating operations and maintenance (O&M) and repair and replacement (R&R) responsibilities Putting in place O&M reporting requirements. The goal is to minimize disagreements ...

  13. John William (Bill) Ebert Jr. ? Longtime Y-12 Maintenance Manager

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    John William (Bill) Ebert Jr. - Longtime Y-12 Maintenance Manager I knew him as "Mr. Ebert" when his office was in Building 9734. I used to park my bicycle in the hallway just...

  14. Method and computer program product for maintenance and modernization backlogging

    DOE Patents [OSTI]

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  15. Gas characterization system operation, maintenance, and calibration plan

    SciTech Connect (OSTI)

    Tate, D.D.

    1996-03-04

    This document details the responsibilities and requirements for operation, maintenance, and calibration of the Gas Characterization Systems (GCS) analytical instrumentation. It further, defines the division of responsibility between the Characterization Monitoring Development organization and Tank Farms Operations.

  16. MIDC: Web Site Search

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MIDC Web Site Search Enter words or phrases: Search Clear Help Also see the site directory. [NREL] [MIDC]

  17. Advanced Remote Maintenance Design for Pilot-Scale Centrifugal Contactors

    Office of Scientific and Technical Information (OSTI)

    (Journal Article) | SciTech Connect Journal Article: Advanced Remote Maintenance Design for Pilot-Scale Centrifugal Contactors Citation Details In-Document Search Title: Advanced Remote Maintenance Design for Pilot-Scale Centrifugal Contactors Advanced designs of used nuclear fuel recycling processes and radioactive waste treatment processes are expected to include more ambitious goals for aqueous based separations including; higher separations efficiency, high-level waste minimization, and

  18. Requirements-Based Surveillance and Maintenance Review Guide | Department

    Office of Environmental Management (EM)

    Requirements for Bridge Inspection Requirements for Bridge Inspection More Documents & Publications Microsoft PowerPoint - 2009.10.27 Bridge Inspection Follow-up Slide 1 National Bridge Inventory Record Data Submission Requirement of Energy

    Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Use of the Guidance Manual This manual was developed to provide organizations with the knowledge and tools necessary to

  19. Siting Methodologies for Hydrokinetics

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 2009 Siting Methodologies for Hydrokinetics Siting Methodologies for Hydrokinetics Navigating the Regulatory Framework Prepared by Pacific Energy Ventures, LLC on behalf of the U.S. Department of Energy December 2009 Siting Methodologies for Hydrokinetics: Navigating the Regulatory Framework 2009 December 2009 Siting Methodologies for Hydrokinetics Intentionally Left Blank Siting Methodologies for Hydrokinetics: Navigating the Regulatory Framework 2009 December 2009 Siting Methodologies

  20. Improving cogeneration plant performance through effective maintenance strategies

    SciTech Connect (OSTI)

    Sheikh, S.M.

    1998-12-31

    Gas-fired cogeneration plants supplying power and thermal energy make up an increasing percentage of new fossil generation capacity additions, both in the US and overseas. These plants are popular, not only because they cost less to build, but also because they are highly efficient and their operation and maintenance costs are lower than plants using the traditional coal-based Rankine cycle. One of the methods being used to contain the initial cost of building cogeneration plants is to minimize redundancy both in the quantity of spare equipment specified for the various systems in the plants and in the design capacity of individual components. The overall effect of such a strategy may lead to reduced reliability and availability of the cogeneration plant in the long term. Operating cogeneration plants present a variety of technologies, equipment, and operating practices. While newer cogeneration plants routinely operate at a reliability of 90% or higher, older plants may not be able to achieve such performance due to excessive equipment breakdowns or inadequate maintenance strategies. By not having the appropriate maintenance programs in place, even newer cogeneration plants are vulnerable to deteriorating reliability and availability in the long term. This paper describes mechanisms for directing maintenance resources toward reducing current maintenance costs while maintaining high availability without sacrificing long-term reliability. The maintenance strategies discussed are those that can provide the maximum benefits for improving cogeneration plant reliability, availability, capacity, cost control, and safety.

  1. U.S. Department of Energy Office of Inspector General

    Energy Savers [EERE]

    of Inspector General Office of Audits and Inspections INSPECTION REPORT Alleged Fraud, Waste, Abuse and (b)(6),(b)(7)(C) Mismanagement at the Site Office -. . , .. . - ' - -...

  2. Vermont Permit and License Information: NPDES Stormwater General...

    Open Energy Info (EERE)

    General Permits for Construction SitesLegal Abstract Permit and licensing information for Clean Water Act 304 National Pollution Discharge Elimination System (NPDES) Permits for...

  3. Texas General Land Office - Rights of Way and Miscellaneous Easements...

    Open Energy Info (EERE)

    General Land Office - Rights of Way and Miscellaneous Easements Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Texas General Land Office - Rights of...

  4. Site Monitoring Area Maps

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOepatents Site Map Site Map Home Basic Search Advanced Search DOEPatents FAQ About DOEpatents Site Map DOEpatents Feedback Website Policies/Important Links

    Site Map Site Map Home Basic Search Advanced Search Data Explorer FAQ About Data Explorer Site Map Data Explorer Feedback Website Policies/Important Links

    Site Map Site Map Home Audio Search Fielded Search About FAQ Site Map Contact Us Website Policies/Important Links

    Maps Individual Permit: Site Monitoring Area Maps Each

  5. Environmental assessment: Deaf Smith County site, Texas

    SciTech Connect (OSTI)

    Not Available

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and the eight other potentially sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines. On the basis of these findings, the DOE is nominating the Deaf Smith County site as one of the five sites suitable for characterization. 591 refs., 147 figs., 173 tabs.

  6. Development of Site Transition Plan, Use of the Site Transition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition Development of Site Transition Plan, Use of the Site Transition Framework, ...

  7. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    \ ,.-c , 2 2 a. . FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM . ELIMINATION REPORT FOR THE FORMER GENERAL SERVICES ADMINISTRATION 39TH STREET WAREHOUSE 1716 PERSHING ROAD CHICAGO, ILLINOIS SEP301985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects __--... -_ -._.-_- _"_-. .___.. -... .._ ..-. .-. ..--- . , ' , CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological

  8. 2006 SITE ENVIRONMENTAL REPORT

    SciTech Connect (OSTI)

    BROOKHAVEN NATIONAL LABORATORY; RATEL,K.

    2007-10-01

    Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and compliance, restoration, and surveillance monitoring program performance. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The report is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/ewms/ser/. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD of the full report.

  9. 2002 SITE ENVIRONMENTAL REPORT.

    SciTech Connect (OSTI)

    BROOKHAVEN NATIONAL LABORATORY

    2003-10-01

    The 2002 Site Environmental Report (SER) is prepared in accordance with DOE Order 231.1, ''Environment, Safety and Health Reporting'', and summarizes the status of Brookhaven National Laboratory's (BNL) environmental programs and performance and restoration efforts, as well as any impacts, both past and present, that Laboratory operations have had on the environment. The document is intended to be technical in nature. A summary of the report is also prepared as a separate document to provide a general overview and includes a CD version of the full report. Operated by Brookhaven Science Associates (BSA) for the Department of Energy (DOE), BNL manages its world-class scientific research with particular sensitivity to environmental and community issues. BNL's motto, ''Exploring Life's Mysteries...Protecting its Future'', reflects BNL's management philosophy to fully integrate environmental stewardship into all facets of its missions, with a health balance between science and the environment.

  10. 2005 SITE ENVIRONMENTAL REPORT

    SciTech Connect (OSTI)

    BROOKHAVEN NATIONAL LABORATORY

    2006-08-29

    Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy (DOE). The report is written to inform the public, regulators, employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and compliance, restoration, and surveillance monitoring program performance. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The report is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/ewms/ser/. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD of the full report.

  11. 2009 Site Environmental Report

    SciTech Connect (OSTI)

    Ratel, K.M.; Brookhaven National Laboratory

    2010-09-30

    Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and compliance, restoration, and surveillance monitoring program performance. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The report is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/ewms/ser/. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD of the full report.

  12. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    SciTech Connect (OSTI)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

  13. General | Open Energy Information

    Open Energy Info (EERE)

    General Jump to: navigation, search Informacin y Documentos Herramientas y Modelos <> Estadsticas de Energas Renovables Volver Pgina principal General banner.jpg Retrieved...

  14. 7He General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    He General Table The General Table for 7He is subdivided into the following categories: Experimental Theoretical Model Calculations Hypernuclei and Mesons Pions

  15. 9He General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    He General Table The General Table for 9He is subdivided into the following categories: Shell Model Other Model Calculations Theoretical

  16. 5H General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    H General Table The General Table for 5H is subdivided into the following categories: Cluster Model Hypernuclei Model Calculations Photodisintegration Pions...

  17. 10He General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    General Table The General Table for 10He is subdivided into the following categories: Theoretical Shell Model Cluster Model Other Models Special States Electromagnetic Transitions...

  18. Land Use Baseline Report Savannah River Site

    SciTech Connect (OSTI)

    Noah, J.C.

    1995-06-29

    This document is to serve as a resource for Savannah River Site managers, planners, and SRS stakeholders by providing a general description of the site and land-use factors important to future use decisions and plans. The intent of this document is to be comprehensive in its review of SRS and the surrounding area.

  19. 2003 SITE ENVIRONMENTAL REPORT

    SciTech Connect (OSTI)

    ENVIRONMENT AND WASTE MANAGMENT SERVICES DIVISION; ET AL.

    2004-10-01

    Each year, Brookhaven National Laboratory (BNL), a multi-program national laboratory, prepares an annual Site Environmental Report (SER) in accordance with Order 231.1A, Environment, Safety and Health Reporting, of the U.S. Department of Energy (DOE). The SER is written to inform outside regulators, the public, and Laboratory employees of BNL's environmental performance during the calendar year in review, and to summarize BNL's on-site environmental data; environmental management performance; compliance with applicable DOE, Environmental Protection Agency (EPA), state, and local regulations; and environmental, restoration, and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. This report is intended to be a technical document. It is available in print and as a downloadable file on the BNL web page at http://www.bnl.ser.htm. A summary of the SER is also prepared each year to provide a general overview, and is distributed with a CD version of the full-length SER. The summary supports BNL's educational and community outreach program.

  20. Natural phenomena hazards site characterization criteria

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The criteria and recommendations in this standard shall apply to site characterization for the purpose of mitigating Natural Phenomena Hazards (wind, floods, landslide, earthquake, volcano, etc.) in all DOE facilities covered by DOE Order 5480.28. Criteria for site characterization not related to NPH are not included unless necessary for clarification. General and detailed site characterization requirements are provided in areas of meteorology, hydrology, geology, seismology, and geotechnical studies.

  1. Application of Standard Maintenance Windows in PHWR Outage

    SciTech Connect (OSTI)

    Fuming Jiang [Third Qinshan Nuclear Power Company, Ltd. (China)

    2006-07-01

    The concept of Standard Maintenance Windows has been widely used in the planned outage of light water reactor in the world. However, due to the specific feature of Pressurized Heavy Water Reactor (PHWR), it has not come to a consensus for the PHWR owners to adopt Standard Maintenance Windows for planned outage aiming at the optimization of outage duration. Third Qinshan Nuclear Power Company (TQNPC), with their experience gained in the previous outages and with reference to other PHWR power plants, has identified a set of Standard Maintenance Windows for planned outage. It can be applied to similar PHWR plants and with a few windows that are specific to Qinshan Phase III NPP. The use of these Standard Maintenance Windows in planned outage has been proved to be effective in control shutdown nuclear safety, minimize the unavailability of safety system, improve the efficient utilization of outage duration, and improved the flexibility of outage schedule in the case of emergency issue, which forced the revision of outage schedule. It has also formed a solid foundation for benchmarking. The identification of Standard Maintenance Windows and its application will be discussed with relevant cases for the common improvement of outage duration. (author)

  2. Operation and maintenance linear accelerator. Conference summary

    SciTech Connect (OSTI)

    Feldman, G.J.

    1983-01-01

    In the opening talk of this meeting, G. Kane defined the minimal standard model to be: (a) three generations of quarks and leptons; (b) massless neutrinos; (c) SU(3)/sub colour/ x SU(2)/sub L/ gauge theory; (d) one neutral Higgs boson; and (e) CP violation solely in the mass matrix. Reaching this point has been the tremendous achievement of the past decade. We have witnessed the discoveries of charm and the third generation, the discovery of neutral currents and the detailed confirmation of SU(2)/sub L/ x U(1), and the discovery of asymptotic freedom and the development of QCD and its experimental tests. In spite of these achievements, the resulting standard model is not entirely esthetically pleasing. It lacks a coherence which would explain its varied form and parameters; as a result, I would wager that none of us here believes that it represents the end of physics. A review of experimental activities is given. These fall into three general categories: searching for evidence of physics beyond the minimal standard model, testing the standard model, and making detailed measurements within this standard model. (WHK)

  3. Siting handbook for small wind energy conversion systems

    SciTech Connect (OSTI)

    Wegley, H.L.; Ramsdell, J.V.; Orgill, M.M.; Drake, R.L.

    1980-03-01

    This handbook was written to serve as a siting guide for individuals wishing to install small wind energy conversion systems (WECS); that is, machines having a rated capacity of less than 100 kilowatts. It incorporates half a century of siting experience gained by WECS owners and manufacturers, as well as recently developed siting techniques. The user needs no technical background in meteorology or engineering to understand and apply the siting principles discussed; he needs only a knowledge of basic arithmetic and the ability to understand simple graphs and tables. By properly using the siting techniques, an owner can select a site that will yield the most power at the least installation cost, the least maintenance cost, and the least risk of damage or accidental injury.

  4. Environmental assessment: Davis Canyon site, Utah

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has fond that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of five sites suitable for characterization. 181 figs., 175 tabs.

  5. VALIDATION OF SPRING OPERATED PRESSURE RELIEF VALVE TIME TO FAILURE AND THE IMPORTANCE OF STATISTICALLY SUPPORTED MAINTENANCE INTERVALS

    SciTech Connect (OSTI)

    Gross, R; Stephen Harris, S

    2009-02-18

    The Savannah River Site operates a Relief Valve Repair Shop certified by the National Board of Pressure Vessel Inspectors to NB-23, The National Board Inspection Code. Local maintenance forces perform inspection, testing, and repair of approximately 1200 spring-operated relief valves (SORV) each year as the valves are cycled in from the field. The Site now has over 7000 certified test records in the Computerized Maintenance Management System (CMMS); a summary of that data is presented in this paper. In previous papers, several statistical techniques were used to investigate failure on demand and failure rates including a quantal response method for predicting the failure probability as a function of time in service. The non-conservative failure mode for SORV is commonly termed 'stuck shut'; industry defined as the valve opening at greater than or equal to 1.5 times the cold set pressure. Actual time to failure is typically not known, only that failure occurred some time since the last proof test (censored data). This paper attempts to validate the assumptions underlying the statistical lifetime prediction results using Monte Carlo simulation. It employs an aging model for lift pressure as a function of set pressure, valve manufacturer, and a time-related aging effect. This paper attempts to answer two questions: (1) what is the predicted failure rate over the chosen maintenance/ inspection interval; and do we understand aging sufficient enough to estimate risk when basing proof test intervals on proof test results?

  6. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Office of Legacy Management (LM)

    Slick Rock, Colorado Page 17-1 17.0 Slick Rock, Colorado, Disposal Site 17.1 Compliance Summary The Slick Rock, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on May 12, 2015. The site was in good condition. Inspectors identified contact information that needed updating on the entrance sign; no other maintenance needs or cause for a follow-up inspection was required. 17.2 Compliance Requirements Requirements for the long-term surveillance and

  7. SITE OFFICE CONSOLIDATION

    Broader source: Energy.gov [DOE]

    Paul Golan, Site Office Manager, SLAC/LBNL, presented on the role of the DOE Site Office. Paul covered the role of the DOE Site Office, operating model, and vision.

  8. Paducah WDA Site Selection

    Broader source: Energy.gov [DOE]

    Initially, proposed sites were identified that offered the available area required to contain the estimated waste. Twelve sites were identified. After screening criteria were applied, five sites met the Threshold Criteria.

  9. Sandia Energy - Siting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Siting Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Solar Market Transformation Siting SitingTara Camacho-Lopez2015-03-20T19:23:23+00:00 At the...

  10. Evaluation of urban storm-water maintenance in North Carolina

    SciTech Connect (OSTI)

    Roenigk, D.J.; Paterson, R.G.; Heraty, M.A.; Kaiser, E.J.; Burby, R.J.

    1992-06-01

    Spurred by continuing urban growth and new federal mandates for control of nonpoint source pollution, local governments are increasingly concerned about the need to improve stormwater management. Long-term maintenance is a critical aspect of stormwater management if both water quality and water quantity benefits are to be realized in practice. The report examines what is actually being done in North Carolina cities to maintain stormwater systems and what selected stormwater experts feel should be done. Several actions are needed. First, local governments are recommended to pay greater attention to system planning, apply more stringent design standards, and monitor the effectiveness of structures protecting water quality as the most critical basis for successful long-term maintenance. Second, policy makers at all levels of government and researchers need to determine appropriate strategies for the treatment and disposal of accumulated sediments. Finally, further research about the best maintenance practices and financing arrangements may be needed.

  11. Potential Release Sites

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PRS Potential Release Sites Legacy sites where hazardous materials are found to be above acceptable levels are collectively called potential release sites. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Less than 10 percent of the total number of potential release sites need to go through the full corrective action process. What are potential release sites? Potential release sites are areas around the Laboratory and

  12. [SITE NAME] Fact Sheet

    Office of Legacy Management (LM)

    Shiprock, New Mexico, Disposal Site This fact sheet provides information about the Shiprock, New Mexico, Disposal Site. These sites are managed by the U.S. Department of Energy Office of Legacy Management under Title I of the Uranium Mill Tailings Radiation Control Act of 1978. Location of the Shiprock Disposal Site Site Description and History The Shiprock site is the location of a former uranium- and vanadium-ore processing facility within the Navajo Nation in the northwest corner of New

  13. Siting and Barrier Mitigation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Tool for Siting, Planning, and Encroachment Analysis for Renewables The Department of ... the Tool for Siting, Planning, and Encroachment Analysis for Renewables (TSPEAR). ...

  14. Hanford Site Hazards Guide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Hazards Guide 2016 Approved for Public Release; Further Dissemination Unlimited Hanford Site Hazards Guide Contents ASBESTOS .............................................................................................................................................. 2 BERYLLIUM ........................................................................................................................................... 4 CHEMICAL SAFETY

  15. Nevada Test Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in greater detail in the Nevada Test Site Environ- mental Report 2004 (DOENV11718-1080). ... mental programs and efforts Nevada Test Site Environmental Report 2004 Summary ...

  16. Chapter 3: Building Siting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Significant opportunities for creating greener facilities arise during the site selection and site planning stages of design. Because LANL development zones are pre- determined, ...

  17. ARM - Cool Sites

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox ...

  18. Search - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Search Search Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Search Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size

  19. Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Electric Vehicles Maintenance and Safety of Hybrid and Plug-In Electric Vehicles to someone by E-mail Share Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Facebook Tweet about Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Twitter Bookmark Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Google Bookmark Alternative Fuels Data Center: Maintenance

  20. FEMP Offers New Training on Photovoltaic Operations and Maintenance Best

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Practices | Department of Energy New Training on Photovoltaic Operations and Maintenance Best Practices FEMP Offers New Training on Photovoltaic Operations and Maintenance Best Practices November 4, 2014 - 2:40pm Addthis The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) will present O&M Best Practices for Small Scale PV Systems, a live First Thursday Seminar on December 4, 2014, from 1:30 p.m. to 3 p.m. This new First Thursday Seminar will feature a new

  1. Text-Alternative Version: Maintenance Practices for LED Streetlights |

    Energy Savers [EERE]

    Department of Energy Maintenance Practices for LED Streetlights Text-Alternative Version: Maintenance Practices for LED Streetlights Bruce Kinzey:So again, I want to welcome everyone to another MSSLC webinar. And we have a great one lined up today. At this point everyone is familiar with the fact that the solid-state street lighting is being installed by the thousands, hundreds of thousands in fact, around the country. I think everyone's also pretty familiar with the kinds of energy savings

  2. Using condition monitoring for maintenance, control of hydro plants

    SciTech Connect (OSTI)

    Brown, N.; Varo, R.; Morras, F.A.

    1994-12-31

    Electric utilities are actively seeking ways of optimizing the economics of their operations by improving productivity and reducing time and money spent on maintenance. Iberdrola, a Spanish utility, is using advanced machine condition-monitoring technology to centralize control and maintenance of its hydropower projects as a means of achieving those goals. The company is using a blend of technologies to supervise their projects from a regional control center. The monitoring scheme makes use of data from on-line, machine-condition monitors, displays from in-plant audio asnd video equipment, and analysis from the control center`s SCADA system.

  3. Maintenance implementation plan for the Fast Flux Test Facility

    SciTech Connect (OSTI)

    Boyd, J.A.

    1997-01-30

    This plan implements the U.S. Department of Energy (DOE) 4330.4B, Maintenance Management Program (1994), at the Fast Flux Test Facility (FFTF). The FFTF is a research and test reactor located near Richland, Washington, and is operated under contract for the DOE by the B&W Hanford Company (BWHC). The intent of this Maintenance Implementation Plan (MIP) is to describe the manner in which the activities of the maintenance function are executed and controlled at the FFTF and how this compares to the requirements of DOE 4330.4B. The MIP ii a living document that is updated through a Facility Maintenance Self- Assessment Program. During the continuing self-assessment program, any discrepancies found are resolved to meet DOE 4330.4B requirements and existing practices. The philosophy of maintenance management at the FFTF is also describe within this MIP. This MIP has been developed based on information obtained from various sources including the following: * A continuing self-assessment against the requirements of the Conduct of Maintenance Order * In-depth reviews conducted by the members of the task team that assembled this MIP * Inputs from routine audits and appraisals conducted at the facility The information from these sources is used to identify those areas in which improvements could be made in the manner in which the facility conducts maintenance activities. The action items identified in Rev. 1 of the MIP have been completed. The MIP is arranged in six sections. Section I is this Executive Summary. Section 2 describes the facility and its 0683 history. Section 3 describes the philosophy of the graded approach and how it is applied at FFTF. Section 3 also discusses the strategy and the basis for the prioritizing resources. Section 4 contains the detailed discussion of `the elements of DOE 4330.4B and their state of implementation. Section 5 is for waivers and requested deviations from the requirements of the order. Section 6 contains a copy of the Maintenance Self-Assessment Schedule for the FFTF. In January 1997, the Secretary of Energy declared that DOE-HQ planned to place the FFTF in a hot standby condition.

  4. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    SciTech Connect (OSTI)

    Poderis, Reed J.; King, Rebecca A.

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or documented ? Provides instructions for implementing annual S&M inspections and activities The following facilities that were included in Revision 1 of this plan have reached final disposition and are no longer in the S&M program: ? Reactor Maintenance, Assembly, and Disassembly Facility, Building 25-3110 ? Test Cell A Facility, Building 25-3113 ? TCC Facility, Building 25-3210 ? Pluto Disassembly Facility, Building 26-2201 ? Super Kukla Facility, Building 27-5400

  5. Annual Site Environmental Report Calendar Year 2010

    SciTech Connect (OSTI)

    Kayser, Dan

    2011-01-31

    This report summarizes the environmental status of Ames Laboratory for calendar year 2010. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. In 2010, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local regulations and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2010. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2010. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2010. Included in these efforts were battery and CRT recycling, miscellaneous electronic office equipment, waste white paper and green computer paper-recycling and corrugated cardboard recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, foamed polystyrene peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Performance Evaluation Measurement Plan, on its Affirmative Procurement Performance Measure. A performance level of 'A-' was achieved in 2010 for Integrated Safety, Health and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System (EMS) has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts. The Laboratory's EMS was audited in April 2009 by DOE-CH. There were four 'Sufficiently in Conformity' findings as a result of the audit. All four findings were tracked in the Laboratory's corrective action database for completion. Beryllium was used routinely at Ames Laboratory in the 1940's and 1950's in processes developed for the production of highly pure uranium and thorium in support of the historic Manhattan Project. Laboratory metallurgists also worked on a process to produce pure beryllium metal from beryllium fluoride. In the early 1950's, beryllium oxide powder was used to produce shaped beryllium and crucibles. As a result of that work, beryllium contamination now exists in many interstitial spaces (e.g., utility chases) and ventilation systems in Wilhelm, Spedding and Metals Development buildings. Extensive characterization and remediation efforts have occurred in 2009 and 2010 in order to better understand the extent of the contamination. Analysis of extensive sampling data suggests that a fairly wide dispersion of beryllium occurred (most likely in the 1950's and 60's) in Wilhelm Hall and in certain areas of Spedding Hall and Metals Development. Area air-sampling results and work-area surface characterizations indicate the exposure potential to current workers, building visitors and the public remains extremely low. This information is now used to guide cleaning efforts and to provide worker protection during remodeling and maintenance activities. Results were shared with the DOE's Former Worker Program to support former worker medical test

  6. CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  7. Establishing an In-House Wind Maintenance Program

    SciTech Connect (OSTI)

    2011-12-01

    Update to the 2008 guidebook titled “Establishing an In-house Wind Maintenance Program”, which was developed to support utilities in developing O&M strategies. This update includes significant contributions from utilities and other stakeholders around the country, representing all perspectives and regardless of whether or not they own wind turbines or projects.

  8. CRAD, Maintenance- Los Alamos National Laboratory TA 55 SST Facility

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance program at the Los Alamos National Laboratory TA 55 SST Facility.

  9. Orifice-type condensate removal device reduces maintenance, energy costs

    SciTech Connect (OSTI)

    Wright, T.N.; Isaacs, M.

    1983-02-01

    In the acrylate section of the Rohm and Haas Texas plant in Deer Park, conventional steam traps were replaced by a potential orifice-type condensate removal device that has no moving parts or gaskets. Each of the devices installed resulted in a saving of an estimated $2000/year by eliminating the maintenance required on the original steam traps.

  10. Establishing an In-House Wind Maintenance Program

    SciTech Connect (OSTI)

    2011-12-01

    Update to the 2008 guidebook titled Establishing an In-house Wind Maintenance Program, which was developed to support utilities in developing O&M strategies. This update includes significant contributions from utilities and other stakeholders around the country, representing all perspectives and regardless of whether or not they own wind turbines or projects.

  11. CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

  12. 8Be General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Be General Tables The General Table for 8Be is subdivided into the following categories: Reviews Ground State Properties Shell Model Cluster Model Other Models Photodisintegration Fission and Fusion Astrophysical b-decay Hypernuclei

  13. 8He General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    He General Tables The General Table for 8He is subdivided into the following categories: Reviews Ground-state Properties Shell Model Cluster Model Other Theoretical Work Elastic and Inelastic Scattering b-decay

  14. 9B General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B General Table The General Table for 9B is subdivided into the following categories: Shell Model Cluster Model Theoretical Other Model Calculations Complex Reactions Beta-Decay Pions Light-ion and Neutron Induced Reactions Hypernuclei

  15. 9C General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C General Table The General Table for 9C is subdivided into the following categories: Shell Model Cluster Model Other Models Theoretical Beta-Decay Light-ion and Neutron Induced Reactions Astrophysical

  16. ARM - Site Tours

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HomeroomSite Tours Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox Lesson Plans Site Tours As part of the Barrow Arctic Science Consortium outreach program, Courtney Hammond brought third-grade students from Fred Ipalook Elementary School to the ARM site in Barrow, Alaska for a science field trip in

  17. Enterprise Assessments Review, Savannah River Site 2014 Site...

    Energy Savers [EERE]

    Savannah River Site 2014 Site-Level Exercise - January 2015 Enterprise Assessments Review, Savannah River Site 2014 Site-Level Exercise - January 2015 January 2015 Review of the ...

  18. Criteria Document for B-plant Surveillance and Maintenance Phase Safety Basis Document

    SciTech Connect (OSTI)

    SCHWEHR, B.A.

    1999-08-31

    This document is required by the Project Hanford Managing Contractor (PHMC) procedure, HNF-PRO-705, Safety Basis Planning, Documentation, Review, and Approval. This document specifies the criteria that shall be in the B Plant surveillance and maintenance phase safety basis in order to obtain approval of the DOE-RL. This CD describes the criteria to be addressed in the S&M Phase safety basis for the deactivated Waste Fractionization Facility (B Plant) on the Hanford Site in Washington state. This criteria document describes: the document type and format that will be used for the S&M Phase safety basis, the requirements documents that will be invoked for the document development, the deactivated condition of the B Plant facility, and the scope of issues to be addressed in the S&M Phase safety basis document.

  19. Siting analyses for existing facilities

    SciTech Connect (OSTI)

    Ford, K.; Mannan, M. [RMT/Jones and Neuse, Inc., Austin, TX (United States)

    1996-08-01

    The term {open_quotes}facility siting{close_quotes} refers to the spacial relationships between process units, process equipment within units, and the location of buildings relative to process equipment. Facility siting is an important consideration for the safe operation of manufacturing facilities. Paragraph (d) of the Process Safety Management (PSM) rule (29 CFR 1910.119) requires employers to document the codes and standards used for designing process equipment. This documentation includes facility siting. The regulation also requires employers to document that the design of the facility complies with recognized and generally accepted good engineering practices. In addition, paragraph (e) of the PSM regulation requires that facility siting be evaluated during Process Hazard Analyses. Facility siting issues may also need to be considered in emergency planning and response which are required under paragraph (n) of the PSM rule. This paper will demonstrate, by utilizing an example, one technique for evaluating whether buildings could be affected by a catastrophic incident and for determining if these buildings should be included in the PSM programs developed at the facility such as Process Hazard Analysis and Mechanical Integrity. In addition, this example will illustrate a methodology for determining if the buildings are designed and located in accordance with good engineering practice and industry standards.

  20. Early Site Permit Demonstration Program, plant parameters envelopes: Comparison with ranges of values for four hypothetical sites. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    The purpose of this volume is to report the results of the comparison of the ALWR plan parameters envelope with values of site characteristics developed for our hypothetical sites that generally represent conditions encountered within the United States. This effort is not intended to identify or address the suitability of any existing site, site area, or region in the United States. Also included in this volume is Appendix F, SERCH Summaries Regarding Siting.

  1. OFFICE OF INSPECTOR GENERAL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    APP-005 Planning for and Measuring Office of Inspector General Results FY 2002 Annual Performance Report and FY 2003 Annual Performance Plan Office of Inspector General U.S. Department of Energy Inspector General's Message We are pleased to present the Office of Inspector General's (OIG) consolidated Fiscal Year 2002 Annual Performance Report and Fiscal Year 2003 Annual Performance Plan. This document evaluates our actual Fiscal Year (FY) 2002 performance and establishes the performance goals

  2. Siting guidelines for utility application of wind turbines. Final report

    SciTech Connect (OSTI)

    Pennell, W.T.

    1983-01-01

    Utility-oriented guidelines are described for identifying viable sites for wind turbines. Topics and procedures are also discussed that are important in carrying out a wind turbine siting program. These topics include: a description of the Department of Energy wind resource atlases; procedures for predicting wind turbine performance at potential sites; methods for analyzing wind turbine economics; procedures for estimating installation and maintenance costs; methods for anlayzing the distribution of wind resources over an area; and instrumentation for documenting wind behavior at potential sites. The procedure described is applicable to small and large utilities. Although the procedure was developed as a site-selection tool, it can also be used by a utility who wishes to estimate the potential for wind turbine penetration into its future generation mix.

  3. A = 7 General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 General Tables The General Table for 7He is subdivided into the following categories: Experimental Theoretical Model Calculations Hypernuclei and Mesons Pions The General Table for 7Li is subdivided into the following categories: Reviews Ground State Properties Shell Model Cluster Model Other Theoretical Work Model Calculations Photodisintegration Polarization Fission and Fusion Elastic and Inelastic Scattering Projectile Fragmentation and Multifragmentation Astrophysical Hyperfine Structure

  4. Site Map | ScienceCinema

    Office of Scientific and Technical Information (OSTI)

    Site Map Site Map Home Audio Search Fielded Search About FAQ Site Map Contact Us Website Policies/Important Links

  5. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    SciTech Connect (OSTI)

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.

  6. Westinghouse Hanford Job Control System: Integration of preventive maintenance systems into a job control system

    SciTech Connect (OSTI)

    Hayenga, J.L.; Longwell, T.C.

    1989-10-01

    The goal of a maintenance program is to assure equipment is available to function as required. To meet this goal corrective maintenance (CM) and preventive maintenance (PM) programs are essential, and both should be considered when evaluating a maintenance program. Work control is the tool used to effectively control CM and PM. We will consider reasons that Corrective and Preventive Maintenance programs should be integrated. How the 200 Area Preventive Maintenance program is being integrated into the Job Control System (JCS), and problems posed by an operation like Hanford which is large scale in terms of geography, number of components and number of independently run plants.

  7. Environmental assessment: Deaf Smith County site, Texas

    SciTech Connect (OSTI)

    Not Available

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of the nine potentially acceptable sites for mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines.

  8. Salmon Site Remedial Investigation Report, Exhibit 2

    SciTech Connect (OSTI)

    USDOE NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

  9. Maintenance Free Fluidic Transfer and Mixing Devices for Highly Radioactive Applications - Design, Development, Deployment and Operational Experience

    SciTech Connect (OSTI)

    Phillips, C.; Richardson, J. E.; Fallows, P.

    2006-07-01

    Power Fluidics is the generic name for a range of maintenance-free fluid transfer and mixing devices, capable of handling a wide range of highly radioactive fluids, jointly developed by British Nuclear Group, its US-based subsidiary BNG America, and AEA Technology. Power Fluidic devices include Reverse Flow Diverters (RFDs), Vacuum Operated Slug Lifts (VOSLs), and Air Lifts, all of which have an excellent proven record for pumping radioactive liquids and sludges. Variants of the RFD, termed Pulse Jet Mixers (PJMs) are used to agitate and mix tank contents, where maintenance-free equipment is desirable, and where a high degree of homogenization is necessary. The equipment is designed around the common principle of using compressed air to provide the motive force to transfer liquids and sludges. These devices have no moving parts in contact with the radioactive medium and therefore require no maintenance in radioactive areas of processing plants. Once commissioned, Power Fluidic equipment has been demonstrated to operate for the life of the facility. Over 800 fluidic devices continue to operate safely and reliably in British Nuclear Group's nuclear facilities at the Sellafield site in the United Kingdom, and some of these have done so for almost 40 years. More than 400 devices are being supplied by AEA Technology and BNG America for the Waste Treatment Plant (WTP) at the Hanford Site in southeastern Washington State, USA. This paper discusses: - Principles of operation of fluidic pumps and mixers. - Selection criteria and design of fluidic pumps and mixers. - Operational experience of fluidic pumps and mixers in the United Kingdom. - Applications of fluidic pumps and mixers at the U.S. Department of Energy nuclear sites. (authors)

  10. Fernald Environmental Management Project 1995 site environmental report

    SciTech Connect (OSTI)

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  11. 2004 SITE ENVIRONMENTAL REPORT

    SciTech Connect (OSTI)

    BROOKHAVEN NATIONAL LABORATORY; SER TEAM; ENVIRONMENTAL INFORMATION MANAGEMENT SERVICES GROUP; ENVIROMENTAL AND WASTE MANAGEMENT SERVICES DIVISION FIELD SAMPLING TEAM

    2005-08-22

    Each year, Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy (DOE). The SER is written to inform the public, regulators, Laboratory employees, and other stakeholders of BNL's environmental performance during the calendar year in review. The report summarizes BNL's environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. The SER is intended to be a technical document. It is available in print and as a downloadable file on the BNL web page at http://www.bnl.gov/esd/SER.htm. A summary of the SER is also prepared each year to provide a general overview of the report, and is distributed with a CD version of the full report. The summary supports BNL's educational and community outreach program.

  12. 2007 Site Environmental Report

    SciTech Connect (OSTI)

    Ratel,K.

    2008-10-01

    Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in this volume in Chapter 7, Groundwater Protection. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the-length report.

  13. Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2007-09-01

    The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure cover has been placed on unit U-3ax/bl (Corrective Action Unit 110) at the Area 3 RWMS. Monolayer-evapotranspirative closure cover designs for the U-3ah/at and U-3bh units are provided in this plan. The current-design closure cover thickness is 3 meters (10 feet). The final design cover will have an optimized cover thickness, which is expected to be less than 3 m (10 ft). Although waste operations at the Area 3 RWMS have ceased at the end of June 2006, disposal capacity is available for future disposals at the U-3ah/at and U-3bh units. The Area 3 RWMS is expected to start closure activities in fiscal year 2025, which include the development of final performance assessment and composite analysis documents, closure plan, closure cover design for construction, cover construction, and initiation of the post-closure care and monitoring activities. Current monitoring at the Area 3 RWMS includes monitoring the cover of the closed mixed waste unit U-3ax/bl as required by the Nevada Department of Environmental Protection, and others required under federal regulations and DOE orders. Monitoring data, collected via sensors and analysis of samples, are needed to evaluate radiation doses to the general public, for performance assessment maintenance, to demonstrate regulatory compliance, and to evaluate the actual performance of the RWMSs. Monitoring provides data to ensure the integrity and performance of waste disposal units. The monitoring program is designed to forewarn management and regulators of any failure and need for mitigating actions. The plan describes the program for monitoring direct radiation, air, vadose zone, biota, groundwater, meteorology, and subsidence. The requirements of post-closure cover maintenance and monitoring will be determined in the final closure plan.

  14. Office of Inspector General | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Department » Office of Inspector General Office of Inspector General Office of Inspector General Latest Reports & News May 6, 2016 Audit Report: OAI-FS-16-09 Management Letter on the Western Federal Power System's Fiscal Year 2015 Financial Statement Audit May 6, 2016 Inspection Report: OAI-L-16-09 Review of Management and Accountability of Sealed Radioactive Sources Maintained at Department Sites May 2, 2016 Audit Report: DOE-OIG-16-12 The Department of Energy's Energy Information

  15. Improving Site-Specific Radiological Performance Assessments - 13431

    SciTech Connect (OSTI)

    Tauxe, John; Black, Paul; Catlett, Kate; Lee, Robert; Perona, Ralph; Stockton, Tom; Sully, Mike

    2013-07-01

    An improved approach is presented for conducting complete and defensible radiological site-specific performance assessments (PAs) to support radioactive waste disposal decisions. The basic tenets of PA were initiated some thirty years ago, focusing on geologic disposals and evaluating compliance with regulations. Some of these regulations were inherently probabilistic (i.e., addressing uncertainty in a quantitative fashion), such as the containment requirements of the U.S. Environmental Protection Agency's (EPA's) 40 CFR 191, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes, Chap. 191.13 [1]. Methods of analysis were developed to meet those requirements, but at their core early PAs used 'conservative' parameter values and modeling approaches. This limited the utility of such PAs to compliance evaluation, and did little to inform decisions about optimizing disposal, closure and long-term monitoring and maintenance, or, in general, maintaining doses 'as low as reasonably achievable' (ALARA). This basic approach to PA development in the United States was employed essentially unchanged through the end of the 20. century, principally by the U.S. Department of Energy (DOE). Performance assessments developed in support of private radioactive waste disposal operations, regulated by the U.S. Nuclear Regulatory Commission (NRC) and its agreement states, were typically not as sophisticated. Discussion of new approaches to PA is timely, since at the time of this writing, the DOE is in the midst of revising its Order 435.1, Radioactive Waste Management [2], and the NRC is revising 10 CFR 61, Licensing Requirements for Land Disposal of Radioactive Waste [3]. Over the previous decade, theoretical developments and improved computational technology have provided the foundation for integrating decision analysis (DA) concepts and objective-focused thinking, plus a Bayesian approach to probabilistic modeling and risk analysis, to guide improvements in PA. This decision-making approach, [4, 5, 6] provides a transparent formal framework for using a value- or objective-focused approach to decision-making. DA, as an analytical means to implement structured decision making, provides a context for both understanding how uncertainty affects decisions and for targeting uncertainty reduction. The proposed DA approach improves defensibility and transparency of decision-making. The DA approach is fully consistent with the need to perform realistic modeling (rather than conservative modeling), including evaluation of site-specific factors. Instead of using generic stylized scenarios for radionuclide fate and transport and for human exposures to radionuclides, site-specific scenarios better represent the advantages and disadvantages of alternative disposal sites or engineered designs, thus clarifying their differences as well as providing a sound basis for evaluation of site performance. The full DA approach to PA is described, from explicitly incorporating societal values through stakeholder involvement to model building. Model building involves scoping by considering features, events, processes, and exposure scenarios (FEPSs), development of a conceptual site model (CSM), translation into numerical models and subsequent computation, and model evaluation. These are implemented in a cycle of uncertainty analysis, sensitivity analysis and value of information analysis so that uncertainty can be reduced until sufficient confidence is gained in the decisions to be made. This includes the traditional focus on hydrogeological processes, but also places emphasis on other FEPSs such as biotically-induced transport and human exposure phenomena. The significance of human exposure scenarios is emphasized by modifying the traditional acronym 'FEPs' to include them, hence 'FEPSs'. The radioactive waste community is also recognizing that disposal sites are to be considered a national (or even global) resource. As such, there is a pressing need to optimize their utility withi

  16. Ten Year Site Plans

    Broader source: Energy.gov [DOE]

    A Ten Year Site Plan (TYSP) is the essential planning document linking a site's real property requirements to its mission in support of the Department of Energy’s overall strategic plan. It is a...

  17. Salmon, Mississippi, Site

    Office of Legacy Management (LM)

    The Salmon, Mississippi, Site, also called the Tatum Dome Test Site, is a 1,470-acre tract ... The Salmon test took place on October 22, 1964, at a depth of 2,700 feet below ground ...

  18. nevada national security site

    National Nuclear Security Administration (NNSA)

    7%2A en Nevada National Security Site operator recognized for green fleet http:www.nnsa.energy.govblognevada-national-security-site-operator-recognized-green-fleet

    The...

  19. SRNL Site Map

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    04/2016 SEARCH SRNL GO SRNL Home SRNL Disclaimer & Legal Notices Security Notice This web site is part of a Federal computer system used to accomplish Federal functions. The Savannah River Site (SRS) uses software programs to monitor this web site for security purposes to ensure it remains available to all users and to protect information in the system. By accessing this web site, you are expressly consenting to these monitoring activities. Unauthorized attempts to defeat or circumvent

  20. Disposal Information - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us Hanford Site Wide Programs Hanford Site Solid Waste Acceptance Program Tools Disposal Information About Us Hanford Site Solid Waste Acceptance Program What's New Acceptance Criteria Acceptance Process Tools Approved High Integrity Containers Approved Sorbents, Stabilizers, and Void Fillers Disposal Information Points of Contact Disposal Information Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Disposal of Radioactive Waste at Hanford The Hanford Site

  1. Nevada Site Offce's Talbot

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Offce's Talbot relays Complex 2030 vision 1 erry Talbot, who recently assumed the position as National Nuclear Security Administration (NNSA) Nevada Site Offce (NSO) manager, says Complex 2030 is just one piece of his strategic vision to help the Department of Energy secure America's future. "The activities that occur at the Nevada Test Site (NTS) provide a very specifc value chain," explains Talbot. "That chain includes not only the science that is conducted at the site,

  2. CERCLA - Site Selector

    Office of Legacy Management (LM)

    Management About Legacy Management News Request Information photo_header OLM_bannerblue CERCLA Home: About CERCLA, CERLCA Indexes, CERCLA Help Current Site > None Selected CERCLA HOME Laboratory for Energy-Related Health Research (LEHR) Fernald Preserve Monticello Site Mound Site - Miamisburg Closure Project Rocky Flats Site Weldon Spring Search the Administrative Record The White House USA.gov E-Gov Information Quality FOIA Privacy Program Jobs Opportunity Bulletin Board U.S. Department of

  3. Annual Site Environmental Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Annual Site Environmental Report Updated July 24, 2015 NETL's Annual Site Environmental Report for 2014 -ii- 2014 Annual Site Environmental Report September 9, 2015 U.S. Department of Energy National Energy Technology Laboratory Albany, Oregon Anchorage, Alaska Morgantown, West Virginia Pittsburgh, Pennsylvania Sugar Land, Texas NETL's Annual Site Environmental Report for 2014 -iii- Disclaimer This report was prepared as an account of work sponsored by an agency of the U.S. Government.

  4. 10Li General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Li General Table The General Table for 10Li is subdivided into the following categories: Reviews Theoretical Ground State Properties Shell Model Cluster Model Other Models Special States Astrophysical Electromagnetic Transitions Hypernuclei Photodisintegration Light-Ion and Neutron Induced Reactions These General Tables correspond to the 2003 preliminary evaluation of ``Energy Levels of Light Nuclei, A = 10''. The prepublication version of A = 10 is available on this website in PDF format: A =

  5. Post-Deactivation Surveillance and Maintenance Planning | Department of

    Energy Savers [EERE]

    Post Secondary Project Performance Benchmarks Post Secondary Project Performance Benchmarks Reports five major performance metrics that can be used to benchmark proposed energy service company projects within post secondary education facilities, disaggregated and reported by major retrofit strategy. Author: U.S. Department of Energy PDF icon Post Secondary Project Performance Benchmarks More Documents & Publications K-12 Schools Energy

    Post-Deactivation Surveillance and Maintenance

  6. Color Maintenance of LEDs in Laboratory and Field Applications (Technical

    Office of Scientific and Technical Information (OSTI)

    Report) | SciTech Connect Synopsis: To date, consideration for parametric failure of LED products has largely been focused on lumen maintenance. However, color shift is a cause of early failure for some products, and is especially important to consider in certain applications, like museums, where visual appearance is critical. Example data collected by the GATEWAY program for LED lamps installed in museums shows that many have changed color beyond a reasonable tolerance well before their

  7. Color Maintenance of LEDs in Laboratory and Field Applications (Technical

    Office of Scientific and Technical Information (OSTI)

    Report) | SciTech Connect Synopsis: To date, consideration for parametric failure of LED products has largely been focused on lumen maintenance. However, color shift is a cause of early failure for some products, and is especially important to consider in certain applications, like museums, where visual appearance is critical. Example data collected by the GATEWAY program for LED lamps installed in museums shows that many have changed color beyond a reasonable tolerance well before their

  8. Article Published on LED Lumen Maintenance and Light Loss Factors

    Broader source: Energy.gov [DOE]

    An article has been published in LEUKOS: The Journal of the Illuminating Engineering Society of North America (IES) that may be of interest to the solid-state lighting community. Entitled "Lumen Maintenance and Light Loss Factors: Consequences of Current Design Practices for LEDs," the article was written by Michael Royer of Pacific Northwest National Laboratory and discusses complications related to the lamp lumen depreciation (LLD) light loss factor and LEDs.

  9. Project Profile: Maintenance-Free Stirling Engine for High-Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance-Free Stirling Engine for High-Performance Dish CSP Project Profile: Maintenance-Free Stirling Engine for High-Performance Dish CSP Image of a prototype 30-kW Stirling ...

  10. OpenEI maintenance March 8-9, 2013 | OpenEI Community

    Open Energy Info (EERE)

    OpenEI maintenance March 8-9, 2013 Home > Groups > Utility Rate Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 developer Maintenance OpenEI We would...

  11. RFI Seeks Feedback on Third-party Maintenance Strategy for AMO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools July 28, 2014 - ...

  12. Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of...

    Office of Environmental Management (EM)

    Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of LED A Lamps Operated in Steady-State Conditions Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of LED A ...

  13. General Service LED Lamps

    Broader source: Energy.gov [DOE]

    A U.S. DOE SSL technology fact sheet that compares general service LED light bulbs with incandescent and CFL bulbs.

  14. General Service LED Lamps

    SciTech Connect (OSTI)

    2012-04-01

    Solid-state lighting program technology fact sheet that compares general service incandescent lamps—i.e., light bulbs—to LED and CFL alternatives.

  15. A = 10 General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Table for 10He is subdivided into the following categories: Theoretical Shell Model Cluster Model Other Models Special States Electromagnetic Transitions The General Table for...

  16. A = 9 General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The General Table for 9Li is subdivided into the following categories: Shell Model Cluster Model Theoretical Ground State Properties Special States Other Model Calculations...

  17. 10N General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    subdivided into the following categories: Reviews Ground-State Properties Shell Model Cluster Model Other Theoretical Work These General Tables correspond to "Energy Levels of...

  18. General Groves takes charge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Groves had fixed all the major problems holding up progress. He had obtained the highest credit rating possible, purchased Site X and secured the needed uranium ore. Next he began...

  19. WINDExchange: Siting Wind Turbines

    Wind Powering America (EERE)

    Deployment Activities Printable Version Bookmark and Share Regional Resource Centers Economic Development Siting Resources & Tools Siting Wind Turbines This page provides resources about wind turbine siting. American Wind Wildlife Institute The American Wind Wildlife Institute (AWWI) facilitates timely and responsible development of wind energy, while protecting wildlife and wildlife habitat. AWWI was created and is sustained by a unique collaboration of environmentalists, conservationists,

  20. Legacy Management FUSRAP Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Columbus East, Ohio, Site Fairfield, Ohio, Site Granite City, Illinois, Site Hamilton, Ohio, Site Indian Orchard, Massachusetts, Site Jersey City, New Jersey, Site ...

  1. Maintenance Guide for DOE Low-Level Waste Disposal Facility | Department of

    Energy Savers [EERE]

    Energy Maintenance Guide for DOE Low-Level Waste Disposal Facility Maintenance Guide for DOE Low-Level Waste Disposal Facility Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments and Composite Analyses PDF icon Maintenance Guide for DOE Low-Level Waste Disposal Facility More Documents & Publications Format and Content Guide for DOE Low-Level Waste Disposal Facility Format and Content Guide for DOE Low-Level Waste Disposal Facility

  2. FY 2014 Real Property Data Related to Operations and Maintenance Guidance |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance PDF icon FY_2014_Data_Related_to_Operations_and_Maintenance_Memorandum.pdf More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations FY 2012 Real Property Deferred, Actual, and

  3. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection, LLC | Department of Energy Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance Report to advise you of the work completed and findings made during the maintenance outages for

  4. Remaining Sites Verification Package for the 100-B-24 Spillway, Waste Site Reclassification Form 2006-051

    SciTech Connect (OSTI)

    L. M. Dittmer

    2006-09-18

    The 100-B-24 Spillway is a spillway that was designed to serve as an emergency discharge point for the 116-B-7 outfall in the event that the 100-B-15 river effluent pipelines were blocked, damaged, or undergoing maintenance. The site meets the remedial action objectives specified in the Remaining Sites ROD. The results of confirmatory sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  5. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Office of Legacy Management (LM)

    Green River, Utah Page 7-1 7.0 Green River, Utah, Disposal Site 7.1 Compliance Summary The Green River, Utah, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on March 18, 2015. The disposal cell was in excellent condition. One missing perimeter sign was replaced during the inspection. Inspectors identified no other maintenance needs or cause for a follow-up or contingency inspection. 7.2 Compliance Requirements Requirements for the long-term surveillance

  6. Lawrence Berkeley Laboratory 1993 Site Environmental Report

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    This annual Site Environmental Report summarizes Lawrence Berkeley Laboratory`s (LBL`s) environmental activities in calendar year (CY) 1993. The purpose of this report is to characterize site environmental management performance, confirm compliance status with environmental standards and requirements, and highlight significant programs and efforts. Its format and content are consistent with the requirements of the US Department of Energy (DOE) Order 5400.1, General Environmental Protection Program.

  7. 5He General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    He General Table The General Table for 5He is subdivided into the following categories: Ground State Properties Theoretical Special States Model Discussions Shell Model Cluster Model Complex Reactions Astrophysics Model Calculations Light-ion and Neutron Induced Reactions Electron Scattering Muon Catalyzed Fusion Other Fusion Photodisintegration Polarization Pions Hypernuclei

  8. 6He General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    He General Table The General Table for 6He is subdivided into the following categories: Ground State Properties Theoretical Special States Shell Model Cluster and alpha-particle Models Other Models Model Calculations Complex Reactions Involving 6He Electromagnetic Transitions Muon and Neutrino Capture and Reactions Reactions Involving pions, Other Mesons and Baryon States Photodisintegration Astrophysics Hypernuclei

  9. 6Li General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Li General Table The General Table for 6Li is subdivided into the following categories: Ground State Properties of 6Li Special States Theoretical Shell Model Cluster Models Complex Reactions Involving 6Li Model Calculations Electromagnetic Transitions Muon and Neutrino Capture and Reactions Reactions Involving Pions, Other Mesons and Baryon States Light-ion and Neutron Induced Reactions Pions Hypernuclei Reactions Involving Antiprotons Astrophysics

  10. 7Be General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Be General Table The General Table for 7Be is subdivided into the following categories: Reviews Experimental Work Shell Model Cluster Model Other Theoretical Work Model Calculations Projectile Fragmentation and Multifragmentation Astrophysical b Decay Astrophysical Neutrinos Hypernuclei, Mesons and Other Exotic Particles Applications

  11. 7Li General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Li General Table The General Table for 7Li is subdivided into the following categories: Reviews Ground State Properties Shell Model Cluster Model Other Theoretical Work Model Calculations Photodisintegration Polarization Fission and Fusion Elastic and Inelastic Scattering Projectile Fragmentation and Multifragmentation Astrophysical Hyperfine Structure b-decay Muons Hypernuclei and Mesons Hypernuclei and Baryons Pion, Kaon and Eta-Mesons Other Work Applications

  12. 8B General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B General Tables The General Table for 8B is subdivided into the following categories: Reviews Ground State Properties Shell Model Cluster Model Other Models Photodisintegration and Coulomb Dissociation Elastic and Inelastic Scattering Fragmentation Reactions Astrophysical b Decay Nucleon Spatial Distribution

  13. 8Li General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Li General Tables The General Table for 8Li is subdivided into the following categories: Reviews Ground State Properties Shell Model Cluster Model Other Models Photodissociation Fusion and Fission Elastic and Inelastic Scattering Fragmentation Reactions Astrophysical b Decay Hypernuclei Pions, Kaons and h-mesons

  14. 9Li General Tables

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Li General Table The General Table for 9Li is subdivided into the following categories: Shell Model Cluster Model Theoretical Ground State Properties Special States Other Model Calculations Complex Reactions Beta-Decay Pions Muons Photodisintegration Elastic and Inelastic Scattering Electromagnetic Transitions Astrophysical

  15. SOP for General Program Evaluations

    Broader source: Energy.gov [DOE]

    SOP for General Program Evaluations: Quality Assurance for General Program Evaluation Studies, June 26, 2006.

  16. Rifle, Colorado, Processing Sites and Disposal Site Fact Sheet

    Office of Legacy Management (LM)

    5 Fact Sheet UMTRCA Title I UMTRCA Title I Rifle, Colorado, Processing Sites and Disposal Site This fact sheet provides information about the Uranium Mill Tailings Radiation Control Act of 1978 Title I processing sites and disposal site near Rifle, Colorado. These sites are managed by the U.S. Department of Energy Office of Legacy Management. Locations of the Rife Processing Sites and Disposal Site Site Description and History Two former uranium and vanadium processing sites are located near the

  17. General Permit for Small Municipal Separate Storm Sewer Systems...

    Open Energy Info (EERE)

    Storm Sewer Systems Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: General Permit for Small Municipal Separate Storm Sewer Systems Abstract Permit...

  18. Symmetric generalized binomial distributions

    SciTech Connect (OSTI)

    Bergeron, H.; Curado, E. M. F.; Instituto Nacional de Cincia e Tecnologia - Sistemas Complexos, Rua Xavier Sigaud 150, 22290-180 - Rio de Janeiro, RJ ; Gazeau, J. P.; APC, UMR 7164, Univ Paris Diderot, Sorbonne Paris Cit, 75205 Paris ; Rodrigues, Ligia M. C. S. E-mail: evaldo@cbpf.br E-mail: ligia@cbpf.br

    2013-12-15

    In two recent articles, we have examined a generalization of the binomial distribution associated with a sequence of positive numbers, involving asymmetric expressions of probabilities that break the symmetry win-loss. We present in this article another generalization (always associated with a sequence of positive numbers) that preserves the symmetry win-loss. This approach is also based on generating functions and presents constraints of non-negativeness, similar to those encountered in our previous articles.

  19. General User Proposals (GUPs)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    General User Proposals (GUPs) Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the Participating Research Team (PRT) that operates the beamline. Before Submitting a Proposal Review the ALS Beamlines Directory to learn about the research capabilities of individual beamlines at the ALS. Contact the beamline scientist or the local contact listed in the tables, for additional information about the

  20. Documents - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Documents Documents Documents Documents Hanford Site Cleanup Completion Framework Tri-Party Agreement Freedom of Information and Privacy Act Hanford Site Budget Hanford Site Safety Standards DOE - ORP Contracts/Procurements DOE - RL Contracts/Procurements Integrated Waste Feed Delivery Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RI/FS Sitewide Probabilistic Seismic Hazard Analysis Environmental Documents Email Email Page | Print Print Page |Text Increase Font Size Decrease Font

  1. Documents - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Documents Documents Documents Hanford Site Cleanup Completion Framework Tri-Party Agreement Freedom of Information and Privacy Act Hanford Site Budget Hanford Site Safety Standards DOE - ORP Contracts/Procurements DOE - RL Contracts/Procurements Integrated Waste Feed Delivery Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RI/FS Sitewide Probabilistic Seismic Hazard Analysis Environmental Documents Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size

  2. Environmental - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Documents Environmental Documents Documents Hanford Site Cleanup Completion Framework Tri-Party Agreement Freedom of Information and Privacy Act Hanford Site Budget Hanford Site Safety Standards DOE - ORP Contracts/Procurements DOE - RL Contracts/Procurements Integrated Waste Feed Delivery Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RI/FS Sitewide Probabilistic Seismic Hazard Analysis Environmental CERCLA Five-Year Review NEPA - Categorical Exclusions NEPA - Environmental

  3. Getting Started - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Voluntary Protection Program Getting Started Hanford Site Voluntary Protection Program VPP Home VPP Hanford Site Champions Committee Getting Started Maintaining STAR VPP Communications VPP Conferences Getting Started Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size History of VPP (PDF) VPP How To Guide (PDF) VPP Getting Started Tools Employee Pocket Guide (PDF) What is a Personal Safety Action Plan (PDF) Picture This (PDF) VPP Tenets Tenet 1 (PDF)

  4. Colorado, Processing Sites

    Office of Legacy Management (LM)

    Old and New Rifle, Colorado, Processing Sites September 2014 LMS/RFO-RFN/S11940 This page intentionally left blank LMS/RFO-RFN/S11940 2014 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites September 2014 This page intentionally left blank U.S. Department of Energy 2014 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites September 2014 Doc. No. S11940 Page i Contents Abbreviations

  5. DOE-EM-45 PACKAGING OPERATIONS AND MAINTENANCE COURSE

    SciTech Connect (OSTI)

    Watkins, R.; England, J.

    2010-05-28

    Savannah River National Laboratory - Savannah River Packaging Technology (SRNL-SRPT) delivered the inaugural offering of the Packaging Operations and Maintenance Course for DOE-EM-45's Packaging Certification Program (PCP) at the University of South Carolina Aiken on September 1 and 2, 2009. Twenty-nine students registered, attended, and completed this training. The DOE-EM-45 Packaging Certification Program (PCP) sponsored the presentation of a new training course, Packaging Maintenance and Operations, on September 1-2, 2009 at the University of South Carolina Aiken (USC-Aiken) campus in Aiken, SC. The premier offering of the course was developed and presented by the Savannah River National Laboratory, and attended by twenty-nine students across the DOE, NNSA and private industry. This training informed package users of the requirements associated with handling shipping containers at a facility (user) level and provided a basic overview of the requirements typically outlined in Safety Analysis Report for Packaging (SARP) Chapters 1, 7, and 8. The course taught packaging personnel about the regulatory nature of SARPs to help reduce associated and often costly packaging errors. Some of the topics covered were package contents, loading, unloading, storage, torque requirements, maintaining records, how to handle abnormal conditions, lessons learned, leakage testing (including demonstration), and replacement parts. The target audience for this course was facility operations personnel, facility maintenance personnel, and field quality assurance personnel who are directly involved in the handling of shipping containers. The training also aimed at writers of SARP Chapters 1, 7, and 8, package designers, and anyone else involved in radioactive material packaging and transportation safety. Student feedback and critiques of the training were very positive. SRNL will offer the course again at USC Aiken in September 2010.

  6. Beryllium FAQs - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Hanford Site employee meetings were held May 17, 2010 to discuss beryllium and the Chronic Beryllium Disease Prevention Program (CBDPP). Questions & Answers about Beryllium are...

  7. EPRI Site Selection Report

    Energy Savers [EERE]

    ... ES-1. Combined federal energy consumption by two-digit ZIP code area. ...... xii Fig. ES-2. SMR composite map detailing siting challenges. ...

  8. Approved Ballots - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by the appointed Hoisting & Rigging reviewing subcommittee, were determined to be editorial in nature or the current Hanford site program already met or exceeds the change....

  9. Land Management - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Land Management About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us Land Management Email Email Page | Print Print Page |Text Increase Font Size...

  10. The DOD Siting Clearinghouse

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    impacts or that need multi-Service coordination will receive full Clearinghouse attention 18 Annual Report to Congress * Provides an overview of all DoD Siting...

  11. 2001 SITE ENVIRONMENTAL REPORT

    SciTech Connect (OSTI)

    BROOKHAVEN NATIONAL LABORATORY

    2002-09-01

    THE SITE ENVIRONMENTAL REPORT FOR BROOKHAVEN NATIONAL LABORATORY FOR THE CALENDAR YEAR 2001, AS REQUIRED BY DOE ORDER 231.1.

  12. Beryllium Program - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site workers. Program Performance Assessments Beryllium Program inspection and corrective action documents Feedback & Suggestions A closely monitored area to submit questions,...

  13. 1999 Site Environmental Report

    SciTech Connect (OSTI)

    2000-09-01

    The Site Environmental Report for Brookhaven National Laboratory for the calendar year 1999, as required by DOE Order 231.1.

  14. Berkeley Lab Site Map

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Berkeley Lab | Laboratory Site Map Laboratory Organization Chart DivisionalDepartmental Organization Charts Laboratory Map Interactive Laboratory Map History of the...

  15. Site Transition Guidance

    Office of Environmental Management (EM)

    Site Transition Guidance March 2010 Office of Environmental Management U.S. Department of Energy Washington D. C. 20585 Standard Review Plan (SRP) Technical Framework for EM...

  16. Outreach - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tribal Program Hanford Advisory Board Hanford Site Tours Hanford Speakers Bureau FOIA Reading Room Hanford For Students Administrative Record (AR) Outreach Email Email Page |...

  17. Primary and Site Energy

    U.S. Energy Information Administration (EIA) Indexed Site

    electricity reflect the amount of energy actually consumed within the building. Site energy data are most useful to building engineers, energy managers, building owners and others...

  18. Contact Us - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Helpful Links Media Contacts Hanford Contractors DOE Richland Operations Office Hanford @ Social Media River Corridor and Central Plateau Cleanup Hanford Site Facebook Hanford...

  19. Information Exchange management site

    Energy Science and Technology Software Center (OSTI)

    2012-08-01

    Django site used to manage the approved information exchanges (content models) after creation and public comment at https://github.com/usgin-models.

  20. VPP Communications - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Communications Hanford Site Voluntary Protection Program VPP Home VPP Hanford Site Champions Committee Getting Started Maintaining STAR VPP Communications VPP News Releases VPP Photo Gallery VPP Conferences VPP Communications Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size HANFORD SITE VPP POINTS OF CONTACT Company Name Phone Cell E-Mail DOE-RL VPP POC Larry Yearsley (509)376-5104 Larry.Yearsley@rl.doe.gov CHPRC/VPP Site Co-Chair Jack Griffith (509) 373-5157 (509)

  1. TWP Nauru Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site-Inactive TWP Related Links Facilities and Instruments Manus Island Nauru Island Darwin, AUS ES&H Guidance Statement Operations Science Field Campaigns Year of Tropical...

  2. Gold Awards - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Wide Programs DOE Human Resources Management Recognition and Awards Program Gold Awards About Us DOE Human Resources Management Division DOE Employment Recognition and...

  3. Annual Site Environmental Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Site Environmental Report - 2002 Annual Site Environmental Report - 2002 DOE/NV11718--842 Prepared by Bechtel Nevada Post Office Box 98521 Las Vegas, NV 89193-8521 Prepared by Bechtel Nevada Post Office Box 98521 Las Vegas, NV 89193-8521 Prepared for the U.S. Department of Energy National Nuclear Security Administration Nevada Site Office Contract Number DE-AC08-96NV11718 Prepared for the U.S. Department of Energy National Nuclear Security Administration Nevada Site Office Contract Number

  4. Microsoft Word - 052606 Final Pepco DOE maintenance notice.doc

    Energy Savers [EERE]

    May 26, 2006 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Generating Station Department of Energy Case No. EO-05-01 Dear Mr. Mansueti, Per your request, Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission maintenance outage

  5. Subject: Ames Blue Alert - X-ray Shutter Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ames Blue Alert - X-ray Shutter Maintenance Statement: This lesson learned involves an Ames Laboratory x-ray system. Prior to starting x- ray experiments checking the operability of safety interlocks and x-ray shutter systems will decrease the likelihood of an unplanned exposure incident. Discussion: At the end of a sample run the shutter for an x-ray system at the Ames Laboratory did not close automatically as expected. The researcher followed the approved safety procedures and did not access

  6. Gasbuggy Site Assessment and Risk Evaluation

    SciTech Connect (OSTI)

    2011-03-01

    This report describes the geologic and hydrologic conditions and evaluates potential health risks to workers in the natural gas industry in the vicinity of the Gasbuggy, New Mexico, site, where the U.S. Atomic Energy Commission detonated an underground nuclear device in 1967. The 29-kiloton detonation took place 4,240 feet below ground surface and was designed to evaluate the use of a nuclear detonation to enhance natural gas production from the Pictured Cliffs Formation in the San Juan Basin, Rio Arriba County, New Mexico, on land administered by Carson National Forest. A site-specific conceptual model was developed based on current understanding of the hydrologic and geologic environment. This conceptual model was used for establishing plausible contaminant exposure scenarios, which were then evaluated for human health risk potential. The most mobile and, therefore, the most probable contaminant that could result in human exposure is tritium. Natural gas production wells were identified as having the greatest potential for bringing detonation-derived contaminants (tritium) to the ground surface in the form of tritiated produced water. Three exposure scenarios addressing potential contamination from gas wells were considered in the risk evaluation: a gas well worker during gas-well-drilling operations, a gas well worker performing routine maintenance, and a residential exposure. The residential exposure scenario was evaluated only for comparison; permanent residences on national forest lands at the Gasbuggy site are prohibited

  7. EIS-0359: Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky Site

    Broader source: Energy.gov [DOE]

    This site-specific EIS considers the construction, operation, maintenance, and decontamination and decommissioning of the proposed depleted uranium hexafluoride (DUF6) conversion facility at three locations within the Paducah site; transportation of depleted uranium conversion products and waste materials to a disposal facility; transportation and sale of the hydrogen fluoride (HF) produced as a conversion co-product; and neutralization of HF to calcium fluoride and its sale or disposal in the event that the HF product is not sold.

  8. Berkeley, California, Site Fact Sheet

    Office of Legacy Management (LM)

    California, Site. This site is managed by the U.S. Department of Energy Office of Legacy Management under the Formerly Utilized Sites Remedial Action Program. Berkeley, California, ...

  9. Portsmouth Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Portsmouth Site Portsmouth Site Portsmouth Gaseous Diffusion Plant Portsmouth Gaseous Diffusion Plant The Environmental Cleanup Program at Portsmouth supports site investigations, ...

  10. Site observational work plan for the UMTRA Project site at Tuba City, Arizona

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency`s Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd{sup 3}) (1,100,000 cubic meters [m{sup 3}]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. The wet tailings remaining after processing were placed as a slurry in three piles at the site. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The site is expected to remain in this status until licensed by the U.S. Nuclear Regulatory Commission (NRC) for long-term surveillance and maintenance. The preliminary ground water compliance strategy at the Tuba City site is active remediation-specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource.

  11. Slick Rock, Colorado, Processing Sites and Disposal Sites Fact Sheet

    Office of Legacy Management (LM)

    Slick Rock, Colorado, Processing Sites and Disposal Sites This fact sheet provides information about the Uranium Mill Tailings Radiation Control Act of 1978 Title I processing sites and disposal site at Slick Rock, Colorado. These sites are managed by the U.S. Department of Energy Office of Legacy Management. Locations of the Slick Rock, Colorado, Processing and Disposal Sites Site Descriptions and History The Slick Rock processing sites consist of two former uranium- and vanadium-ore processing

  12. Annual Site Environmental Report Paducah Site

    Energy Savers [EERE]

    Site Environmental Report Paducah Site 2011 PAD-REG-1012 BACK TABLE OF CONTENTS FORWARD Fractions and Multiples of Units Multiple Decimal Equivalent Prefix Symbol Engineering Format 10 6 1,000,000 mega- M E+06 10 3 1,000 kilo- k E+03 10 2 100 hecto- h E+02 10 10 deka- da E+01 10 -1 0.1 deci- d E-01 10 -2 0.01 centi- c E-02 10 -3 0.001 milli- m E-03 10 -6 0.000001 micro- μ E-06 10 -9 0.000000001 nano- n E-09 10 -12 0.000000000001 pico- P E-12 10 -15 0.000000000000001 femto- F E-15 10 -18

  13. Savannah River Site's Site Specific Plan

    SciTech Connect (OSTI)

    Not Available

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  14. Wind turbine reliability : understanding and minimizing wind turbine operation and maintenance costs.

    SciTech Connect (OSTI)

    Not Available

    2004-11-01

    Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. Cost of energy (COE) is a key project evaluation metric, both in commercial applications and in the U.S. federal wind energy program. To reflect this commercial reality, the wind energy research community has adopted COE as a decision-making and technology evaluation metric. The COE metric accounts for the effects of reliability through levelized replacement cost and unscheduled maintenance cost parameters. However, unlike the other cost contributors, such as initial capital investment and scheduled maintenance and operating expenses, costs associated with component failures are necessarily speculative. They are based on assumptions about the reliability of components that in many cases have not been operated for a complete life cycle. Due to the logistical and practical difficulty of replacing major components in a wind turbine, unanticipated failures (especially serial failures) can have a large impact on the economics of a project. The uncertainty associated with long-term component reliability has direct bearing on the confidence level associated with COE projections. In addition, wind turbine technology is evolving. New materials and designs are being incorporated in contemporary wind turbines with the ultimate goal of reducing weight, controlling loads, and improving energy capture. While the goal of these innovations is reduction in the COE, there is a potential impact on reliability whenever new technologies are introduced. While some of these innovations may ultimately improve reliability, in the short term, the technology risks and the perception of risk will increase. The COE metric used by researchers to evaluate technologies does not address this issue. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce COE.

  15. Hanford Beryllium Awareness Group (BAG) - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Wide Programs Beryllium Program Hanford Beryllium Awareness Group (BAG) About Us Beryllium Program Beryllium Program Points of Contact Beryllium Facilities & Areas Beryllium Program Information Hanford CBDPP Committee Beryllium FAQs Beryllium Related Links Hanford Beryllium Awareness Group (BAG) Program Performance Assessments Beryllium Program Feedback Beryllium Health Advocates Primary Contractors/Employers Medical Testing and Surveillance Facilities General Resources Hanford

  16. Generalized galilean genesis

    SciTech Connect (OSTI)

    Nishi, Sakine; Kobayashi, Tsutomu

    2015-03-31

    The galilean genesis scenario is an alternative to inflation in which the universe starts expanding from Minkowski in the asymptotic past by violating the null energy condition stably. Several concrete models of galilean genesis have been constructed so far within the context of galileon-type scalar-field theories. We give a generic, unified description of the galilean genesis scenario in terms of the Horndeski theory, i.e., the most general scalar-tensor theory with second-order field equations. In doing so we generalize the previous models to have a new parameter (denoted by α) which results in controlling the evolution of the Hubble rate. The background dynamics is investigated to show that the generalized galilean genesis solution is an attractor, similarly to the original model. We also study the nature of primordial perturbations in the generalized galilean genesis scenario. In all the models described by our generalized genesis Lagrangian, amplification of tensor perturbations does not occur as opposed to what happens in quasi-de Sitter inflation. We show that the spectral index of curvature perturbations is determined solely from the parameter α and does not depend on the other details of the model. In contrast to the original model, a nearly scale-invariant spectrum of curvature perturbations is obtained for a specific choice of α.

  17. Site Map - Pantex Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Map Site Map Page Content Pantex.com Mission & Strategies Mission National Security Nuclear Explosive Operations Nuclear Material Operations HE Operations Strategies Advance HE Center of Excellence Exemplify a High Reliability Organization Health & Safety Safety Training Occupational Medicine Contractor Safety Environment Environmental Projects & Operations Regulatory Compliance Waste Operations Environmental Management System Environmental Document Library Public Meetings Doing

  18. Site characterization handbook

    SciTech Connect (OSTI)

    Not Available

    1988-06-01

    This Handbook discusses both management and technical elements that should be considered in developing a comprehensive site characterization program. Management elements typical of any project of a comparable magnitude and complexity are combined with a discussion of strategies specific to site characterization. Information specific to the technical elements involved in site characterization is based on guidance published by the Nuclear Regulatory Commission (NRC) with respect to licensing requirements for LLW disposal facilities. The objective of this Handbook is to provide a reference for both NRC Agreement States and non-Agreement States for use in developing a comprehensive site characterization program that meets the specific objectives of the State and/or site developer/licensee. Each site characterization program will vary depending on the objectives, licensing requirements, schedules/budgets, physical characteristics of the site, proposed facility design, and the specific concerns raised by government agencies and the public. Therefore, the Handbook is not a prescriptive guide to site characterization. 18 refs., 6 figs.

  19. VPP Conferences - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Conferences Hanford Site Voluntary Protection Program VPP Home VPP Hanford Site Champions Committee Getting Started Maintaining STAR VPP Communications VPP Conferences National Presentations Regional Presentations VPP Conferences Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size 2014 Regional and National Conferences Regional Conference Event National Conference Event

  20. Solicitation - Geothermal Drilling Development and Well Maintenance Projects

    SciTech Connect (OSTI)

    Sattler, A.R.

    1999-07-07

    Energy (DOE)-industry research and development (R and D) organization, sponsors near-term technology development projects for reducing geothermal drilling and well maintenance costs. Sandia National Laboratories (Albuquerque, NM) administers DOE funds for GDO cost-shared projects and provides technical support. The GDO serves a very important function in fostering geothermal development. It encourages commercialization of emerging, cost-reducing drilling technologies, while fostering a spirit of cooperation among various segments of the geothermal industry. For Sandia, the GDO also serves as a means of identifying the geothermal industry's drilling fuel/or well maintenance problems, and provides an important forum for technology transfer. Successfully completed GDO projects include: the development of a high-temperature borehole televiewer, high-temperature rotating head rubbers, a retrievable whipstock, and a high-temperature/high-pressure valve-changing tool. Ongoing GDO projects include technology for stemming lost circulation; foam cement integrity log interpretation, insulated drill pipe, percussive mud hammers for geothermal drilling, a high-temperature/ high-pressure valve changing tool assembly (adding a milling capability), deformed casing remediation, high- temperature steering tools, diagnostic instrumentation for casing in geothermal wells, and elastomeric casing protectors.

  1. Nuclear Systems Enhanced Performance Program, Maintenance Cycle Extension in Advanced Light Water Reactor Design

    SciTech Connect (OSTI)

    Professor Neill Todreas

    2001-10-01

    A renewed interest in new nuclear power generation in the US has spurred interest in developing advanced reactors with features which will address the public's concerns regarding nuclear generation. However, it is economic performance which will dictate whether any new orders for these plants will materialize. Economic performance is, to a great extent, improved by maximizing the time that the plant is on-line generating electricity relative to the time spent off-line conducting maintenance and refueling. Indeed, the strategy for the advanced light water reactor plant IRIS (International Reactor, Innovative and Secure) is to utilize an eight year operating cycle. This report describes a formalized strategy to address, during the design phase, the maintenance-related barriers to an extended operating cycle. The top-level objective of this investigation was to develop a methodology for injecting component and system maintainability issues into the reactor plant design process to overcome these barriers. A primary goal was to demonstrate the applicability and utility of the methodology in the context of the IRIS design. The first step in meeting the top-level objective was to determine the types of operating cycle length barriers that the IRIS design team is likely to face. Evaluation of previously identified regulatory and investment protection surveillance program barriers preventing a candidate operating PWR from achieving an extended (48 month) cycle was conducted in the context of the IRIS design. From this analysis, 54 known IRIS operating cycle length barriers were identified. The resolution methodology was applied to each of these barriers to generate design solution alternatives for consideration in the IRIS design. The methodology developed has been demonstrated to narrow the design space to feasible design solutions which enable a desired operating cycle length, yet is general enough to have broad applicability. Feedback from the IRIS design team indicates that the proposed solutions to the investigated operating cycle length barriers are both feasible and consistent with sound design practice.

  2. Systems Sustainability: Implementation of Enhanced Maintenance Programs at the Kurchatov Institute, the All-Russian Research Institute of Experimental physics and the All-Russian Scientific Institute for Technical Physics

    SciTech Connect (OSTI)

    Coppinger, M.; Pikula, M.; Randolph, J.D.; Windham, M.

    1999-09-20

    Implementation of quality maintenance programs is essential to enhancing sustainable continuous operations of United States funded Materials Protection, Control and Accountability (MPC and A) equipment/systems upgrades at various Russian nuclear facilities. An effective maintenance program is expected to provide assurances to both parties for achieving maximum continuous systems operations with minimum down time. To be effective, the program developed must focus on minimum down time for any part of a system. Minimum down time is realized through the implementation of a quality maintenance program that includes preventative maintenance, necessary diagnostic tools, properly trained technical staff, and an in-house inventory of required spare parts for repairing the impacted component of the system. A centralized maintenance management program is logistically essential for the success of this effort because of the large volume of MPC and A equipment/systems installed at those sites. This paper will discuss current programs and conditions at the Russian Research Center-Kurchatov Institute, the All-Russian Scientific Institute for Technical Physics and the All-Russian Research Institute of Experimental Physics and will address those steps necessary to implement an upgraded program at those sites.

  3. Site decommissioning management plan

    SciTech Connect (OSTI)

    Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

    1993-10-01

    The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff`s strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites.

  4. Site directed recombination

    DOE Patents [OSTI]

    Jurka, Jerzy W.

    1997-01-01

    Enhanced homologous recombination is obtained by employing a consensus sequence which has been found to be associated with integration of repeat sequences, such as Alu and ID. The consensus sequence or sequence having a single transition mutation determines one site of a double break which allows for high efficiency of integration at the site. By introducing single or double stranded DNA having the consensus sequence flanking region joined to a sequence of interest, one can reproducibly direct integration of the sequence of interest at one or a limited number of sites. In this way, specific sites can be identified and homologous recombination achieved at the site by employing a second flanking sequence associated with a sequence proximal to the 3'-nick.

  5. Idaho National Laboratory Site Pollution Prevention Plan

    SciTech Connect (OSTI)

    E. D. Sellers

    2007-03-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.

  6. 2010 Site Environmental Report

    SciTech Connect (OSTI)

    Ratel, K.; Lee, R; Remien, J; Hooda, B; Green, T; Williams, J; Pohlot, P; Dorsch, W; Paquette, D; Burke, J

    2011-10-01

    Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in Chapter 7, Groundwater Protection, of this volume. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the full report. BNL is operated and managed for DOE's Office of Science by Brookhaven Science Associates (BSA), a partnership formed by Stony Brook University and Battelle Memorial Institute. For more than 60 years, the Laboratory has played a lead role in the DOE Science and Technology mission and continues to contribute to the DOE missions in energy resources, environmental quality, and national security. BNL manages its world-class scientific research with particular sensitivity to environmental issues and community concerns. The Laboratory's motto, 'Exploring Life's Mysteries...Protecting its Future,' and its Environmental, Safety, Security and Health Policy reflect the commitment of BNL's management to fully integrate environmental stewardship into all facets of its mission and operations.

  7. NGNP SITE 2 HAZARDS ASSESSMENT

    SciTech Connect (OSTI)

    Wayne Moe

    2011-10-01

    The Next Generation Nuclear Plant (NGNP) Project initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy pursuant to the 2005 Energy Policy Act, is based on research and development activities supported by the Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of the high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite-moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. Accordingly, it can be applied in many industrial applications as a substitute for burning fossil fuels, such as natural gas, to generate process heat in addition to producing electricity, which is the principal application of current LWRs. Nuclear energy in the form of LWRs has been used in the U.S. and internationally principally for the generation of electricity. However, because the HTGR operates at higher temperatures than LWRs, it can be used to displace the use of fossil fuels in many industrial applications. It also provides a carbon emission-free energy supply. For example, the energy needs for the recovery and refining of petroleum, for the petrochemical industry and for production of transportation fuels and feedstocks using coal conversion processes require process heat provided at temperatures approaching 800 C. This temperature range is readily achieved by the HTGR technology. This report summarizes a site assessment authorized by INL under the NGNP Project to determine hazards and potential challenges that site owners and HTGR designers need to be aware of when developing the HTGR design for co-location at industrial facilities, and to evaluate the site for suitability considering certain site characteristics. The objectives of the NGNP site hazard assessments are to do an initial screening of representative sites in order to identify potential challenges and restraints to be addressed in design and licensing processes; assure the HTGR technology can be deployed at variety of sites for a range of applications; evaluate potential sites for potential hazards and describe some of the actions necessary to mitigate impacts of hazards; and, provide key insights that can inform the plant design process. The report presents a summary of the process methodology and the results of an assessment of hazards typical of a class of candidate sites for the potential deployment of HTGR reactor technology. The assessment considered health and safety, and other important siting characteristics to determine the potential impact of identified hazards and potential challenges presented by the location for this technology. A four reactor module nuclear plant (2000 to 2400 MW thermal), that co-generates steam, electricity for general use in the plant, and hot gas for use in a nearby chemical processing facility, to provide the requisite performance and reliability was assumed for the assessment.

  8. GENERAL PRINCIPLES OF AGREEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    GENERAL PRINCIPLES OF AGREEMENT HWB-14-20 and HWB-14-21 These General Principles of Agreement ("Principles of Agreement") are agreed upon by the New Mexico Environment Department ("NMED"), and the United States Department of Energy ("DOE"), Los Alamos National Security, LLC ("LANS"), and Nuclear Waste Partnership, LLC ("NWP") (collectively, with DOE and LANS, the "DOE Permittees") for the purpose of resolving Compliance Order Nos.

  9. Columbus, Ohio, Site Fact Sheet

    Office of Legacy Management (LM)

    2 Columbus, Ohio, Sites This fact sheet provides information about the Columbus, Ohio, Sites. The U.S. Department of Energy Office of Legacy Management is responsible for maintaining records for this site. Location of the Columbus Sites Site Description and History The Columbus, Ohio, Sites consist of two geographically separate properties owned by the Battelle Memorial Institute: the King Avenue site, located in the city of Columbus, and the West Jefferson site, located approximately 15 miles

  10. Expedited site characterization

    SciTech Connect (OSTI)

    McCreary, I.; Booth, S.R.

    1997-03-01

    Expedited Site Characterization (ESC) is being offered as a new, more cost-effective way to perform DOE environmental site characterizations. Site characterization of environmental cleanup sites can be costly and time consuming. {open_quotes}Traditional techniques,{close_quotes} though effective, are the outgrowth of cautious and often restrictive regulatory control. At some sites up to 40% of the funds and 70% of the time spent on cleanup operations have been devoted to characterization. More realistically, the DOE`s Ten Year Plan (TYP) Cost Rollup by Category (high budgetary version) budgets $1.34 billion to remedial action assessments out of a total of $9.7 billion in remedial actions - about 14% of the total TYP expenditures for this type of cleanup work. The expenditure percentage for characterization drops to a much lower 3% of total expenditures during outyears, after 2006, as most of the assessments will have been completed during the early TYP years. (The sampling and monitoring costs, however, rise from 7% of the budget during the TYP to 30% during the outyears as this activity continues and others decline. Improved characterizations could have the potential to reduce the need for some of these ongoing monitoring costs.) Fortunately, regulatory agencies have begun to relax many of the constraints on site characterization allowing more efficient and innovative approaches to be applied. Argonne National Laboratory`s Expedited Site Characterization is perhaps the best defined of these new approaches. ESC is founded on the premise that it is cheaper, faster, and more efficient to develop and test a conceptual model (or {open_quotes}hypothesis{close_quotes}) of contamination at a site than it is to collect data on a statistical basis and then attempt to model a site from those data. The difference between these two approaches has been described as a {open_quotes}scientific versus an engineering approach{close_quotes}.

  11. Constrained Generalized Supersymmetries

    SciTech Connect (OSTI)

    Toppan, Francesco; Kuznetsova, Zhanna

    2005-10-17

    We present a classification of admissible types of constraint (hermitian, holomorphic, with reality condition on the bosonic sectors, etc.) for generalized supersymmetries in the presence of complex spinors. A generalized supersymmetry algebra involving n-component real spinors Qa is given by the anticommutators {l_brace}Q{sub a},Q{sub b}{r_brace} = Z{sub ab} where the matrix Z appearing in the r.h.s. is the most general symmetric matrix. A complex generalized supersymmetry algebra is expressed in terms of complex spinors Qa and their complex conjugate Q* a. The most general (with a saturated r.h.s.) algebra is in this case given by {l_brace}Q{sub a},Q{sub b}{r_brace} P{sub ab}{l_brace}Q*{sub a}, Q*{sub b}{r_brace} = P*{sub ab}{l_brace}Q{sub a},Q*{sub b}{r_brace} = R{sub ab} where the matrix Pab is symmetric, while Rab is hermitian. The bosonic right hand side can be expressed in terms of the rank-k totally antisymmetric tensors P{sub ab} {sigma}k(C{gamma}{sub [{mu}}{sub 1...{mu}}{sub k]}){sub ab}P{sup [{mu}{sup 1...{mu}{sup k}]}.The decomposition in terms of anti-symmetric tensors for any space-time up to dimension D = 13 is presented. Real type, complex type, and quaternionic type space-times are classified. Any restriction on the saturated bosonic generators that allows all possible combinations of these tensors is in principle admissible by a Lorenz-covariant requirement. We investigate division algebra constraints and their influence on physical models. High spin theory models are presented as examples of the applications of such models.

  12. Nevada National Security Site

    National Nuclear Security Administration (NNSA)

    Nevada National Security Site Proud Past, Exciting Future Nevada National Security Site Pre-Proposal Meeting November 19, 2015 Agenda * 8:30 am Welcome * 9:00 am Overview of NNSS and NFO * 10:00 am Break * 10:30 am NNSS Video * 11:00 am Questions * 11:30 am Lunch * 1:00 pm Solicitation Overview * 2:15 pm Break * 2:45 pm Questions * 4:00 pm Conclusion The Nevada National Security Site * Large geographically diverse outdoor laboratory - 1,360 square miles of federally owned and controlled land -

  13. Hanford History - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us Hanford History About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us Hanford History Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size The Hanford Site sits on 586-square-miles of shrub-steppe desert in southeastern Washington State. Beginning in 1943, the site was used to produce plutonium for the bomb that brought an end to World War II. After a short lull, production was ramped up in 1947 to meet the challenges of the

  14. TWP Darwin Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Darwin Site-Inactive TWP Related Links Facilities and Instruments Manus Island Nauru Island Darwin, AUS ES&H Guidance Statement Operations Science Field Campaigns Year of Tropical Convection Visiting the Site TWP Fact Sheet Images Information for Guest Scientists Contacts TWP Darwin Site-Inactive Location: 12° 25' 28.56" S, 130° 53' 29.75" E Altitude: 29.9 meters The third TWP climate research facility was established in April 2002 in Darwin, Northern Territory, Australia. The

  15. TWP Manus Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Manus Site-Inactive TWP Related Links Facilities and Instruments Manus Island Nauru Island Darwin, AUS ES&H Guidance Statement Operations Science Field Campaigns Year of Tropical Convection Visiting the Site TWP Fact Sheet Images Information for Guest Scientists Contacts TWP Manus Site-Inactive Location: 2° 3' 39.64" S, 147° 25' 31.43" E Altitude: 4 meters In August 1996, the first climate research facility in the Tropical Western Pacific locale was established. The Manus

  16. Portsmouth Site Sustainability Team

    Broader source: Energy.gov [DOE]

    Planning and coordination of recycling and other environmentally responsible efforts. Site Sustainability Team (SST). environmental stewardship and compliance, Executive Order Orders 13514 13423, Environmental Compliance, Acquisition, Cleanup, EMS, Energy, Greenhouse Gases, High Performance Buildings, NEPA, Electronics Stewardship, Pollution Prevention, Chemical Management, Sustainability, Transportation, Climate Change Adaption, Water Efficiency, Natural Resources and development and implementation of the PORTS Site Sustainability Plan Portsmouth Site Sustainability Plan. Fluor-B&W Portsmouth, Fluor-BWXT Portsmouth, BWCS BWXT Conversion Services, WEMS Wastren EnergX Mission Support.

  17. EM Active Sites (large) | Department of Energy

    Energy Savers [EERE]

    Active Sites (large) EM Active Sites (large) Center

  18. Maintenance approaches and practices in selected foreign nuclear power programs and other US industries: Review and lessons learned

    SciTech Connect (OSTI)

    Not Available

    1990-04-01

    The Commission published a Notice of Proposed Rule-making on Maintenance of Nuclear Power Plants on November 28, 1988, spelling out NRC's expectations in maintenance. In preparing the proposed rule, the NRC reviewed maintenance practices in other countries and considered maintenance approaches in other industries in this country. As a result of the review of maintenance practices, it was concluded that certain practices in the following areas have been found to contribute significantly to effective maintenance: (1) systems approach; (2) effectiveness monitoring; (3) technician qualifications and motivation; and (4) maintenance organization. 87 refs., 26 figs., 2 tabs.

  19. Hanford Site air operating permit application

    SciTech Connect (OSTI)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  20. Paducah Site Management Plan

    Broader source: Energy.gov [DOE]

    The annual Paducah Gaseous Diffusion Plant Site Management Plan (SMP) outlines DOE’s strategic approach for achieving cleanup under the Federal Facility Agreement. The purpose of the SMP is to...

  1. MEMORANDUM TO: FILE SITE

    Office of Legacy Management (LM)

    L ED--INVO-V AT SITE ------... ccmtra1 (-J AECIrlED managed CperatiOn q Health Physics Protection L Little or None, G AECtlED responsible for ...

  2. Accessibility - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy is committed to providing access to our Web pages for individuals with disabilities. To meet this committment, this site is built to comply with the requirements of...

  3. Nevada National Security Site

    Broader source: Energy.gov [DOE]

    HISTORYIn 1950, President Truman established what is now known as the Nevada National Security Site (NNSS) to perform nuclear weapons testing activities.  In support of national defense initiatives...

  4. Site Management Guide

    Broader source: Energy.gov [DOE]

    The main purpose of the LM Site Management Guide is to be a reference document for LM and its contractor(s) and to provide accurate and consistent information across the LM organization. The guide is updated annually.

  5. INSIDE: ITER Site Progress

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of all 400 kV substation equipment and all 22 kV switchgear. 2 Four US-supplied HV transformers were the first plant components installed at the ITER site in October 2015. Photo:...

  6. Potential Release Sites

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    head of Los AlamosPueblo watershed, and then continued on to the Mortandad and WaterCanon de Valle watersheds. Work will progress to the remaining watersheds until sites in all...

  7. Fermilab Site Map

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    use this map The Village Fermilab Meson, Nuetrino and Proton Experiment Areas Wilson Hall, Ramsey Auditorium Site 38 (Support Area) and vicinity CDF, D0, TD, Tevatron Main Injector...

  8. Contacts / Hours - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contacts Hours Hanford Meteorological Station Real Time Met Data from Around the Site Current and Past 48 Hours HMS Observations Daily HMS Extremes in Met Data Met and Climate ...

  9. The DOD Siting Clearinghouse

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—provides an overview on the U.S. Department of Defense (DoD) clearinghouse for siting renewable energy technologies.

  10. Savannah river site

    National Nuclear Security Administration (NNSA)

    at the Savannah River Site (SRS) to supply and process tritium, a radioactive form of hydrogen that is a vital component of nuclear weapons. SRS loads tritium and non-tritium...

  11. Montana MCA 75-20-104, Policy and General Provisions Definitions...

    Open Energy Info (EERE)

    75-20-104, Policy and General Provisions Definitions for Major Facility Siting Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  12. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    SciTech Connect (OSTI)

    Enbar, Nadav; Weng, Dean; Klise, Geoffrey Taylor

    2015-12-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefi t the industry at-large.

  13. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    SciTech Connect (OSTI)

    Enbar, Nadav; Weng, Dean; Klise, Geoffrey Taylor

    2016-01-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefit the industry at-large.

  14. Maintenance is the cheapest way to improve fine coal dewatering

    SciTech Connect (OSTI)

    Burger, J.

    1986-01-01

    There are a great many things that a preparation plant operator can do right now to increase fine coal dewatering effectiveness and maintenance is one of them, says Donald A. Dahlstrom, at the University of Utah. Dewatering of fine coal is increasingly important, because electricity generation, the largest coal consumer, is so strongly affected by the moisture content. Every pound of water put into a boiler raises costs about 2 1/2 cents. The heat it takes to turn water to steam and get it out the stack is heat that could have been used to generate power. In addition, there is the cost of shipping the water. You can add the freight costs to that. In contrast it costs about 1/2-cent/lb to remove the water at the preparation plant.

  15. Weather - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weather Weather Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Weather Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Hanford Weather as reported by NOAA. Current 62.6°F Overcast Overcast Today 86°F (50°F) Mostly Sunny Mostly Sunny Tomorrow 87°F (57°F) Partly Sunny Partly Sunny

  16. Hanford Site Freedom

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Freedom ofInformation Act ~ Department of Energy HANFORD SITE FOIA Requests FOIA Home FOIA Admin Page 1 of3 FREEDOM OF INFORMATION ACT Freedom of Information Act Administration: Electronic FOIA Request Detail Thank you for your Freedom of Information Act Information Request. Within the next four weeks we will notify you of either how long the search will take to complete or the availability of the information you requested. Request Number: Name: Organization: Address: Country: Phone Number:

  17. USGIN Lab site

    Energy Science and Technology Software Center (OSTI)

    2009-08-01

    This web site provides information related to service profiles and implementation in development for the US Geoscience information network (USGIN). It is meant to be a site where developers can learn about the standard in use, the objectives of the application profiles being developed, software being used or tested for implementation of services, and details about particular implementations. Forums are provided for asking questions about the services, profiles, and implemenation issues.

  18. Summary Site Environmental Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Environmental Report for Calendar Year 2013 ANL-14/02 (Summary) Environment, Safety, and Quality Assurance Division Argonne National Laboratory For more information about Argonne's Site Environmental Report, contact Theresa Davis, 630.252.6077 or tmdavis@anl.gov. For more information about Argonne and its programs, visit the laboratory's website at www.anl.gov or contact Communications, Education, and Public Affairs, at 630.252.5575. Katherine Obmascik edited the text. Photos by Mark Lopez.

  19. Helpful Links - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Helpful Links Helpful Links Helpful Links Hanford Staff Directory Hanford Site Wide Programs Energy Employees Occupational Illness Compensation Hanford Workers Compensation Projects & Facilities HERO PHOENIX Hanford Meteorological Station Definitions Abbreviations and Acronyms Visitor Control and Site Access Visitor Hanford Computer Access Request Helpful Links Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Contact Us Do you have a question? Contact Hanford

  20. About Us - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Us About Us About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us About Us Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Cleanup of the Hanford Site is overseen by two Department of Energy Offices, the Richland Operations Office (RL) and the Office of River Protection (ORP). Each office has a staff of about 250 federal employees. The work largely involves contract oversight and safety and compliance-related work. The U.S.