Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994  

SciTech Connect

This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

Fisk, E.L.

1994-06-01T23:59:59.000Z

2

Los Alamos Site Office Nuclear Maintenance Management Program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Evaluations Activity Report for the Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment Dates of Activity : 11142011 - 11182011 Report...

3

PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE September 1, 2011 - 12:00pm Addthis The new wire rope before installation. The new wire rope before installation. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. The new wire rope before installation. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. Carlsbard, NM - The effectiveness of the Waste Isolation Pilot Plant's (WIPP) preventive maintenance program paid huge dividends late last month

4

Site Transition Framework for Long-Term Surveillance and Maintenance  

Energy.gov (U.S. Department of Energy (DOE))

The Site Transition Framework (STF) provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTS&...

5

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance .Employees shall be encouraged to become involved in the identification and control of hazards in the workplace. (DOE O 440.1A CRD) Workers shall have the right, without reprisal, to accompany DOE worker

6

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2009  

SciTech Connect

This report summarizes the annual inspection, sampling, and maintenance activities performed on and near the Salmon, Mississippi, Site in calendar year 2009. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report complies with the annual report requirement. The Salmon, MS, Site is located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS The site encompasses 1,470 acres and is not open to the general public. The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned responsibility for the site effective October 1, 2006

None

2010-10-01T23:59:59.000Z

7

Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities  

SciTech Connect

This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-09-28T23:59:59.000Z

8

Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities  

SciTech Connect

This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-09-28T23:59:59.000Z

9

A passivity-based decentralized strategy for generalized connectivity maintenance  

Science Conference Proceedings (OSTI)

The design of decentralized controllers coping with the typical constraints on the inter-robot sensing/communication capabilities represents a promising direction in multi-robot research thanks to the inherent scalability and fault tolerance of these ... Keywords: algebraic graph theory, bilateral shared control, connectivity maintenance, decentralized control, decentralized estimation, mobile robotics, multi-robot systems, passivity-based control

Paolo Robuffo Giordano, Antonio Franchi, Cristian Secchi, Heinrich H Bülthoff

2013-03-01T23:59:59.000Z

10

Maintenance Assessment Plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAINTENANCE MAINTENANCE Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of

11

General Maintenance Applications Center: Combined Cycle Combustion Turbine Maintenance Guide for the Combustor Section of the Combus tion Turbine  

Science Conference Proceedings (OSTI)

Combustion turbine combined cycle (CTCC) facilities utilize various components that are unique to these types of power-generation plants and that are not typically found in a nuclear or fossil-power plant.  As such, use of the EPRI PM Basis Database (PMDB) by current owners of CTCC facilities is limited to only those components that are common to both types of power plants.  With the projected growth in the number of CTCC facilities, EPRI General Maintenance Applications Center (GenMAC) ...

2012-12-31T23:59:59.000Z

12

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2011  

SciTech Connect

This report summarizes the 2011 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi.

None

2012-03-01T23:59:59.000Z

13

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010  

SciTech Connect

This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

None

2011-03-01T23:59:59.000Z

14

Maintenance  

Science Conference Proceedings (OSTI)

Higher oil and labour costs, plus low quality fuel, demand that management takes a closer look at diesel engine lubrication. Problems of corrosion due to sulphur containing acids, oil analysis in order that it can be changed when necessary, filter analysis, use of multi-viscosity oil, and storage of oils are considered. A comprehensive lubricant conservation programme can reduce maintenance, labour costs and equipment downtime. Cleaning and replacement of bearings are discussed. Managing tire costs is also described.

Not Available

1981-06-01T23:59:59.000Z

15

ORNL NASA DAAC WEB Site Maintenance, Thursday Mornings August...  

NLE Websites -- All DOE Office Websites (Extended Search)

Thursdays, August 7, and August 21, 2008 8:30-9:30 a.m. EDT The ORNL DAAC web site will be unavailable between 8:30 a.m. and 9:30 a.m., Eastern Daylight Saving Time (EDT), on...

16

ORNL NASA DAAC WEB Site Maintenance, Thursday Morning November...  

NLE Websites -- All DOE Office Websites (Extended Search)

Thursday, November 13, 2008 8:30-9:30 a.m. EST The ORNL DAAC web site will be unavailable between 8:30 a.m. and 9:30 a.m., Eastern Standard Time (EST), on Thursday, November 11,...

17

ORNL NASA DAAC Web Site Maintenance, Saturday Evening March 28...  

NLE Websites -- All DOE Office Websites (Extended Search)

Saturday, March 28, 2009 8:00-10:00 p.m. EDT The ORNL DAAC Web site will be unavailable between 8:00 p.m. and 10:00 p.m., Eastern Daylight Time (EDT), on Saturday, March 28...

18

ORNL NASA DAAC Web Site Maintenance, Thursday Morning February...  

NLE Websites -- All DOE Office Websites (Extended Search)

Thursday, February 19, 2009 8:30-9:30 a.m. EST The ORNL DAAC Web site will be unavailable between 8:30 a.m. and 9:30 a.m., Eastern Standard Time (EST), on Thursday, February 19...

19

Site data acquisition subsystem (SDAS) Mod 1, installation, operation, and maintenance manual  

DOE Green Energy (OSTI)

The Site Data Acquisition Subsystem (SDAS) Mod 1 is designed to collect sensor measurement data from a solar energy demonstration site. A brief description of the SDAS is given and the installation requirements and procedures, the operations description and the procedures for field maintenance of the subsystem are defined.

Not Available

1977-10-29T23:59:59.000Z

20

Kansas City Site Office General Workforce Restructuring (2007...  

National Nuclear Security Administration (NNSA)

version Printer-friendly version Facebook Twitter Youtube Flickr General Information Kansas City Site Office General Workforce Restructuring (2007) NEPA Reading Room...

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Microsoft Word - CX-RiceFlatsSiteMaintenanceFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2012 12, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Steve Lowder Project Manager - TESM-AMPN-2 Proposed Action: Rice Flats Electrode Site Maintenance and Inspection Project Budget Information: Work Order #00219387 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The proposed project area is approximately seven miles southeast of The Dalles,

22

Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment, April 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11-18 11-18 Site: Los Alamos National Laboratory Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment Dates of Activity : 11/14/2011 - 11/18/2011 Report Preparer: Tim Martin Activity Description/Purpose: This activity report documents the results of the U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS) review of the Los Alamos Site Office (LASO) self-assessment of LASO's Nuclear Maintenance Management Program (NMMP) oversight program and activities. This self-assessment was led by the DOE LASO Facility Operations/Safety Engineering Team's (FO/SET) Nuclear Facility Maintenance Manager and was

23

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections, Volume 1: General Practices  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.BackgroundAs a focus of innovative approaches and techniques, maintenance of aging steam ...

2013-12-23T23:59:59.000Z

24

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012  

SciTech Connect

This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate2 subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features3), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate

None

2013-03-01T23:59:59.000Z

25

Operations & Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

26

Maintenance of the stratospheric structure in an idealized general circulation model  

Science Conference Proceedings (OSTI)

We explore the maintenance of the stratospheric structure in a primitive equation model that is forced by a Newtonian cooling with a prescribed radiative equilibrium temperature field. Models such as this are well suited to analyze and address ...

M. Jucker; S. Fueglistaler; G. K. Vallis

27

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections-2006; Volume 1: General Practic es  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2007-03-30T23:59:59.000Z

28

Equatorial Superrotation and Maintenance of the General Circulation in Two-Level Models  

Science Conference Proceedings (OSTI)

Suarez and Duffy have noted an interesting bifurcation in a two-level gridpoint general circulation model when strong tropical heating is imposed. This bifurcation results in a model climatology with strong upper-level westerlies in the tropics. ...

R. Saravanan

1993-05-01T23:59:59.000Z

29

Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site  

SciTech Connect

U.S. Department of Energy (DOE) Order 435.1 requires that performance assessments (PAs) and composite analyses (CAs) for low-level waste (LLW) disposal facilities be maintained by the field offices. This plan describes the activities to be performed in maintaining the Performance Assessment (PA) and Composite Analysis (CA) for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS). The Disposal Authorization Statement (DAS) for the continuing operations of a LLW facility at the DOE complex specifies the conditions for operations based on approval of a PA and CA, and requires the facility to implement a maintenance program to assure that these conditions will remain protective of the public health and the environment in the future. The goal of the maintenance program is to provide that assurance. The maintenance process is an iterative one in which changing conditions may result in a revision of PA and CA; the revised PA and CA may impose a different set of conditions for facility operation, closure, and postclosure. The maintenance process includes managing uncertainty, performing annual reviews, submitting annual summary reports to DOE Headquarters (DOE/HQ), carrying out special analyses, and revising the PAs and CAs, if necessary. Management of uncertainty is an essential component of the maintenance program because results of the original PAs and CAs are understood to be based on uncertain assumptions about the conceptual models; the mathematical models and parameters; and the future state of the lands, disposal facilities, and human activities. The annual reviews for the PAs include consideration of waste receipts, facility specific factors, results of monitoring, and results of research and development (R&D) activities. Likewise, results of ongoing R&D, changes in land-use planning, new information on known sources of residual radioactive materials, and identification of new sources may warrant an evaluation to determine the impacts on the conclusions of the CAs.

V. Yucel

2002-09-01T23:59:59.000Z

30

Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites  

Energy.gov (U.S. Department of Energy (DOE))

This document summarizes radiological conditions at sites remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and transferred to the U.S. Department of Energy (DOE) for...

31

Evaluating, Migrating, and Consolidating Databases and Applications for Long-Term Surveillance and Maintenance Activities at the Rocky Flats Site  

SciTech Connect

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is assuming responsibilities for long-term surveillance and maintenance (LTS and M) activities at the Rocky Flats Environmental Technology Site (RFETS) during fiscal year 2006. During the transition, LM is consolidating databases and applications that support these various functions into a few applications which will streamline future management and retrieval of data. This paper discussed the process of evaluating, migrating, and consolidating these databases and applications for LTS and M activities and provides lessons learned that will benefit future transitions. (authors)

Surovchak, S. [U.S. Department of Energy, Office of Legacy Management, Broomfield, Colorado (United States); Marutzky, S.; Thompson, B.; Miller, K.; Labonte, E. [S.M. Stoller Corporation, Grand Junction, Colorado (United States)

2006-07-01T23:59:59.000Z

32

Site handbook: data acquisition system information, passive solar retrofit Automobile Maintenance Facility, City of Philadelphia  

SciTech Connect

Data were collected at the City of Philadelphia's Auto Maintenance Facility using an Aeoloan Kinetics PDL-24 data acquisition system. Instantaneous data readings were recorded each 15 seconds by the microprocessor. These channel readings were then averaged to produce hourly values which were then stored on an audio cassette. The energy saving strategies include: styrofoam and concrete roof coverings; weatherstripping; replacement of north windows with combination insulation and view glazing; PVC strips between heated and unheated areas; gas fired radiant heaters at individual work stations; reduction of the number of light fixtures; and the installation of retrofit window units for radiant solar heating, daylighting, ventilation, glare control and vandalism protection.

1985-01-01T23:59:59.000Z

33

Facilities Maintenance Guide  

Science Conference Proceedings (OSTI)

The subject of facilities maintenance is very broad and is commonly interpreted quite differently among maintenance managers at power plants and U.S. Department of Energy (DOE) nuclear and process facilities. In many cases, the maintenance of administrative buildings, support structures, and "real property" is managed separately from the maintenance of process equipment. The scope and breadth of each maintenance program varies from site to site, as does the formality of the program established to address...

2004-09-16T23:59:59.000Z

34

ORNL NASA DAAC WEB Site Maintenance, November 12 2007 9:00-11...  

NLE Websites -- All DOE Office Websites (Extended Search)

November 12, 2007 9:00-11:00 EST The ORNL DAAC web site will be unavailable between 9:00 a.m. and 11:00 a.m., Eastern Standard Time (EST), on Monday, November 12, 2007...

35

ORNL NASA DAAC WEB Site Maintenance, February 6, 2008 7:30-8...  

NLE Websites -- All DOE Office Websites (Extended Search)

February 6, 2008 7:30-8:00 a.m. EST The ORNL DAAC web site will be unavailable between 7:30 a.m. and 8:00 a.m., Eastern Standard Time (EST), on Wednesday, February 6, 2008...

36

Grand Junction, Colorado, Disposal Site Long-Term Surveillance and Maintenance Program Fact Sheet, July 2001  

Office of Legacy Management (LM)

Grand Junction Disposal Site Grand Junction Disposal Site Uranium ore was processed at the Climax millsite at Grand Junction, Colorado, between 1951 and 1970. The milling operations created process-related waste and tailings, a sandlike material containing radioactive materials and other contaminants. The tailings were an ideal and inexpensive construction material suitable for concrete, mortar, and fill. Accordingly, the tailings were widely used in the Grand Junction area for these purposes. The U.S. Department of Energy (DOE) encapsulated the tailings and other contaminated materials from the millsite and more than 4,000 vicinity properties in the Grand Junction area in an engineered disposal cell. Part of the disposal cell was completed in 1994; the remainder of the cell remains open until it is

37

Nuclear Maintenance Applications Center: Foreign Material Exclusion Site Coordinator Training—Student Handbook  

Science Conference Proceedings (OSTI)

The main purpose of this report is to provide newly appointed foreign material exclusion (FME) coordinators with vital FME program information so they can quickly perform their responsibilities at a high level to ensure that site FME practices do not adversely affect equipment and plant performance. FME coordinators who wish or need to improve station FME program performance would also benefit by attending this training. This report provides a comprehensive overview of technical considerations required t...

2010-12-17T23:59:59.000Z

38

Subj: Educational and General (E&G) Facility Support Provide an overview of Facility Operations, Maintenance, Repair and Renovation and Space  

E-Print Network (OSTI)

and infrastructure. Facilities Energy & Utilities: Energy and Utilities is responsible for campus-wide utility and maintain this system and its components. Deferred Maintenance: Given the age of buildings and the wear buildings and infrastructure in working order. Minor and Major Repairs: Generally, minor repairs include

Pohl, Karsten

39

Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Amchitka, Alaska, Site  

SciTech Connect

This Long-Term Surveillance and Maintenance Plan describes how the U.S. Department of Energy (DOE) intends to fulfill its mission to maintain protection of human health and the environment at the Amchitka, Alaska, Site1. Three underground nuclear tests were conducted on Amchitka Island. The U.S. Department of Defense, in conjunction with the U.S. Atomic Energy Commission (AEC), conducted the first nuclear test (Long Shot) to provide data that would improve the United States' capability of detecting underground nuclear explosions. The second nuclear test (Milrow) was a weapons-related test conducted by AEC as a means to study the feasibility of detonating a much larger device. The final nuclear test (Cannikin), the largest United States underground test, was a weapons-related test. Surface disturbances associated with these tests have been remediated. However, radioactivity remains deep below the surface, contained in and around the test cavities, for which no feasible remediation technology has been identified. In 2006, the groundwater model (Hassan et al. 2002) was updated using 2005 data collected by the Consortium for Risk Evaluation with Stakeholder Participation. Model simulation results indicate there is no breakthrough or seepage of radionuclides into the marine environment within 2,000 years. The Amchitka conceptual model is reasonable; the flow and transport simulation is based on the best available information and data. The simulation results are a quantitative prediction supported by the best available science and technology. This Long-Term Surveillance and Maintenance Plan is an additional step intended for the protection of human health and the environment. This plan may be modified from time to time in the future consistent with the mission to protect human health

None

2008-09-01T23:59:59.000Z

40

Data Base Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Database Maintenance Keys Page anyone in Site Operations Building Management (see Personnel) with your room number. If you are locked out during off-hours, contact Security on...

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Maintenance implementation plan for fuel supply shutdown  

Science Conference Proceedings (OSTI)

This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ``MAINTENANCE MANAGEMENT PROGRAM``, that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan.

Stephenson, R.L.

1995-06-01T23:59:59.000Z

42

Offshore software maintenance methodology  

Science Conference Proceedings (OSTI)

Keywords: maintenance methodology, offshore maintenance, remote maintenance, software economics, software maintenance

M. Pavan Kumar; V. Sita Rama Das; N. Netaji

1996-05-01T23:59:59.000Z

43

REMOVAL OF THE GENERAL SERVICES ADMINISTRATION WATERTOWN, MASSACHUSETTS, PROPERTY FROM THE SITE DECOMMISSIONING MANAGEMENT PLAN  

E-Print Network (OSTI)

To inform the Commission that the staff plans to remove the General Services Administration (GSA) Watertown, MA property from the Site Decommissioning Management Plan (SDMP) as it meets the radiological criteria for unrestricted use in 10 CFR 20.1402. BACKGROUND: The GSA property is located in Watertown, Middlesex County, MA, approximately 13 kilometers (8 miles) west of Boston. It was a parcel of the former Watertown Arsenal used by the U.S. Army for depleted uranium (DU) munition operations authorized under Atomic Energy Commission (AEC) License No. SUB-238. From 1955-1966, an area northeast of the Arsenal site (now identified as the GSA property) was designated for stabilization of DU scrap from Arsenal activities. Operations involved igniting DU fragments at a specific site location (“burn pit”) to reduce volume, packaging the material in waste containers, and preparing shipments for offsite disposal. Contamination of soil resulted from spillage of the DU fragments and burned

William D. Travers

2003-01-01T23:59:59.000Z

44

Long-Term Surveillance and Maintenance at the Rocky Flats Site: Lessons Learned Based on the First Years Real Experiences From the Field  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned - 8350 S. Surovchak U.S. Department of Energy, Office of Legacy Management 11025 Dover Street, Suite 1000, Westminster, CO 80021 L. Kaiser, R. DiSalvo, J. Boylan, G. Squibb, J. Nelson, B. Darr, M. Hanson S.M. Stoller Corporation 11025 Dover Street, Suite 1000, Westminster, CO 80021 ABSTRACT The U.S. Department of Energy's (DOE's) Rocky Flats Site was established in 1951 as part of the United States' nationwide nuclear weapons complex to manufacture nuclear weapons components. In 1992 weapons production halted, and the Rocky Flats mission changed to include environmental investigations, cleanup, and site closure. In October 2005, DOE and its

45

Strategies to Save 50% Site Energy in Grocery and General Merchandise Stores  

NLE Websites -- All DOE Office Websites (Extended Search)

to Save 50% Site to Save 50% Site Energy in Grocery and General Merchandise Stores Adam Hirsch, Elaine Hale, and Matthew Leach Presented at the ACEEE Summer Study 2010 Pacific Grove, California August 15-20, 2010 Conference Paper NREL/CP-5500-48197 March 2011 NOTICE The submitted manuscript has been offered by an employee of the Alliance for Sustainable Energy, LLC (Alliance), a contractor of the US Government under Contract No. DE-AC36-08GO28308. Accordingly, the US Government and Alliance retain a nonexclusive royalty-free license to publish or reproduce the published form of this contribution, or allow others to do so, for US Government purposes. This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty,

46

Of The Hot Cell Facility Site General Atomics San Diego, California W.c. Adams  

E-Print Network (OSTI)

This report was prepared as an account of work sponsored by the United States Government. Neither the United States Government nor the U.S. Department of Energy, nor anyof their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe on privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, mark, manufacturer, or otherwise, does not necessarilyconstitute or imply its endorsement or recommendation, or favor by the U.S. Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the U.S. Government or any agency thereof. OF THE HOT CELL FACILITY SITE GENERAL ATOMICS SAN DIEGO, CALIFORNIA Prepared by W. C. Adams Environmental Survey and Site Assessment Program Radiological Safety, Assessments, and Training Oak Ridge Institute for Science and Education Oak Ridge, Tennessee 37831-0117 Prepared for Office of Site Closure U.S. Department of Energy FINAL REPORT JUNE 2000 This report is based on work performed under a contract with the U.S. Department of Energy

Prepared For The; W. C. Adams; W. C. Adams

2000-01-01T23:59:59.000Z

47

Nuclear Maintenance Applications Center: Guide for the Performance of OnSite and Vendor Shop Inspections of Electric Motors  

Science Conference Proceedings (OSTI)

The power industry is experiencing a loss of expertise as its workforce ages. Compounding the problem is that many plants find that there is limited time to train new workers. Periodically, station and corporate motor specialists are asked to perform inspections of on-site motors to maintain a level of equipment reliability or to perform inspections for customers at vendor motor shops. This report should prove valuable during visual inspections of electric motors.

2008-12-19T23:59:59.000Z

48

Web Recency Maintenance Protocol  

Science Conference Proceedings (OSTI)

In this paper, we propose a new protocol namely Web Recency Maintenance Protocol (WRMP) that employs "push" mechanism to maintain the currency of the World Wide Web (WWW) at Search Engine (SE) site. As of this writing SEs are adopting "pull" technology, ...

K. Satya Sai Prakash; S. V. Raghavan

2002-12-01T23:59:59.000Z

49

Nuclear Maintenance Application Center: Characterizing International Maintenance Practices  

Science Conference Proceedings (OSTI)

In 1987, the Electric Power Research Institute (EPRI) published report NP-5185-SR, Maintenance of European Nuclear Power Plants. The project comprised visits to six plant sites in six European countries over a two-week period and reported on the state of the various maintenance processes and programs in use at each location.

2012-08-07T23:59:59.000Z

50

Electric Motor Predictive Maintenance: Draft Guidelines  

Science Conference Proceedings (OSTI)

Predictive Maintenance can enhance the early detection and avoidance of incipient equipment failures in electric motors. This report provides draft guidelines to support the development of electric motor predictive maintenance (EMPM) programs at utility sites.

1997-10-16T23:59:59.000Z

51

Maintenance simulation: Software issues  

SciTech Connect

The maintenance of a distributed software system in a production environment involves: (1) maintaining software integrity, (2) maintaining and database integrity, (3) adding new features, and (4) adding new systems. These issues will be discussed in general: what they are and how they are handled. This paper will present our experience with a distributed resource management system that accounts for resources consumed, in real-time, on a network of heterogenous computers. The simulated environments to maintain this system will be presented relate to the four maintenance areas.

Luk, C.H.; Jette, M.A.

1995-07-01T23:59:59.000Z

52

Decontamination and decommissioning surveillance and maintenance report for FY 1991  

SciTech Connect

The Decontamination and Decommissioning (D D) Program has three distinct phases: (1) surveillance and maintenance (S M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D D is devoted to S M at each of the sites. Our S M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

Not Available

1991-12-01T23:59:59.000Z

53

Generalized Linear Models for Site-Specific Density Forecasting of U.K. Daily Rainfall  

Science Conference Proceedings (OSTI)

Site-specific probability density rainfall forecasts are needed to price insurance premiums, contracts, and other financial products based on precipitation. The spatiotemporal correlations in U.K. daily rainfall amounts over the Thames Valley are ...

Max A. Little; Patrick E. McSharry; James W. Taylor

2009-03-01T23:59:59.000Z

54

Empowering Operations and Maintenance through Wireless  

Science Conference Proceedings (OSTI)

Presentation Title, Empowering Operations and Maintenance through Wireless. Author(s), Neil Freeman, Soroush Amidi, David Fisk. On-Site Speaker (Planned)

55

Authorized Limits for the Release of a 25 Ton Locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly Facility, Nevada Test Site, Nevada  

SciTech Connect

This document contains process knowledge and radiological data and analysis to support approval for release of the 25-ton locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly (EMAD) Facility, located on the Nevada Test Site (NTS). The 25-ton locomotive is a small, one-of-a-kind locomotive used to move railcars in support of the Nuclear Engine for Rocket Vehicle Application project. This locomotive was identified as having significant historical value by the Nevada State Railroad Museum in Boulder City, Nevada, where it will be used as a display piece. A substantial effort to characterize the radiological conditions of the locomotive was undertaken by the NTS Management and Operations Contractor, National Security Technologies, LLC (NSTec). During this characterization process, seven small areas on the locomotive had contamination levels that exceeded the NTS release criteria (limits consistent with U.S. Department of Energy [DOE] Order DOE O 5400.5, “Radiation Protection of the Public and the Environment”). The decision was made to perform radiological decontamination of these known accessible impacted areas to further the release process. On February 9, 2010, NSTec personnel completed decontamination of these seven areas to within the NTS release criteria. Although all accessible areas of the locomotive had been successfully decontaminated to within NTS release criteria, it was plausible that inaccessible areas of the locomotive (i.e., those areas on the locomotive where it was not possible to perform radiological surveys) could potentially have contamination above unrestricted release limits. To access the majority of these inaccessible areas, the locomotive would have to be disassembled. A complete disassembly for a full radiological survey could have permanently destroyed parts and would have ruined the historical value of the locomotive. Complete disassembly would also add an unreasonable financial burden for the contractor. A decision was reached between the NTS regulator and NSTec, opting for alternative authorized limits from DOE Headquarters. In doing so, NSTec personnel performed a dose model using the DOE-approved modeling code RESRAD-BUILD v3.5 to evaluate scenarios. The parameters used in the dose model were conservative. NSTec’s Radiological Engineering Calculation, REC-2010-001, “Public Dose Estimate from the EMAD 25 Ton Locomotive,” concluded that the four scenarios evaluated were below the 25-millirem per year limit, the “likely” dose scenarios met the “few millirem in a year” criteria, and that the EMAD 25-ton locomotive met the radiological requirements to be released with residual radioactivity to the public.

Jeremy Gwin and Douglas Frenette

2010-04-08T23:59:59.000Z

56

07.A GENERAL 07.A.01 Proper illumination of work spaces, project sites, roadways  

E-Print Network (OSTI)

NFPA Standards. 07.A.09 If work is to be performed at night, a night operations' lighting plan shall outdoor - tunnels and general underground work areas (minimum 110 lux required at tunnel and shaft heading during drilling, mucking, and scaling) 110 50 110 10 5 10 Conveyor routes 110 10 Dam Operating Areas

US Army Corps of Engineers

57

Top Operations and Maintenance (O&M) Efficiency Opportunities at DoD/Army Sites - A Guide for O&M/Energy Managers and Practitioners  

Science Conference Proceedings (OSTI)

This report, sponsored the Army's Energy Engineering Analysis Program, provides the Operations and Maintenance (O&M) Energy manager and practitioner with useful information about the top O&M opportunities consistently found across the DoD/Army sector. The target is to help the DoD/Army sector develop a well-structured and organized O&M program.

Sullivan, Gregory P.; Dean, Jesse D.; Dixon, Douglas R.

2007-05-25T23:59:59.000Z

58

Strategies to Save 50% Site Energy in Grocery and General Merchandise Stores  

SciTech Connect

This paper summarizes the methodology and main results of two recently published Technical Support Documents. These reports explore the feasibility of designing general merchandise and grocery stores that use half the energy of a minimally code-compliant building, as measured on a whole-building basis. We used an optimization algorithm to trace out a minimum cost curve and identify designs that satisfy the 50% energy savings goal. We started from baseline building energy use and progressed to more energy-efficient designs by sequentially adding energy design measures (EDMs). Certain EDMs figured prominently in reaching the 50% energy savings goal for both building types: (1) reduced lighting power density; (2) optimized area fraction and construction of view glass or skylights, or both, as part of a daylighting system tuned to 46.5 fc (500 lux); (3) reduced infiltration with a main entrance vestibule or an envelope air barrier, or both; and (4) energy recovery ventilators, especially in humid and cold climates. In grocery stores, the most effective EDM, which was chosen for all climates, was replacing baseline medium-temperature refrigerated cases with high-efficiency models that have doors.

Hirsch, A.; Hale, E.; Leach, M.

2011-03-01T23:59:59.000Z

59

Dam Construction and Maintenance (Minnesota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction and Maintenance (Minnesota) Construction and Maintenance (Minnesota) Dam Construction and Maintenance (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Program Info State Minnesota Program Type Siting and Permitting Dams may be constructed, improved, or repaired on private, non-navigable waters subject to certain timelines; however, previously-developed hydropower mechanisms cannot be disrupted. The State may also choose to

60

Pulverizer Maintenance Guide  

Science Conference Proceedings (OSTI)

The Pulverizer Maintenance Guide, Volume 3: Ball/Tube Mills provides fossil plant personnel with current maintenance information on ball/tube mills from different manufacturers. This guide will assist a plant in improving the maintenance of their pulverizer mills.

2006-03-31T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Microsoft Word - maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System Maintenance Checklist System Maintenance Checklist The following checklist is intended to provide system owners, project managers and other information system developers and maintainers with guidance in identifying and planning system maintenance activities. The objectives of system maintenance are summarized as: C Resolution of errors, faults, and failures. C The requirements for system maintenance initiates lifecycle changes. The change is remapped and executed, thereby treating the maintenance process as iterations of development. Rev: 09/02 1 Maintenance Checklist SEM Reference Comments " A procedure exists for handling emergency changes that cannot be implemented as part of a scheduled release. Chapter 10 Maintenance " An identification number is assigned to the modification.

62

Cylinder Surveillance and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Surveillance and Maintenance Cylinder Surveillance and Maintenance DOE has a Cylinder Management program in place to inspect and maintain depleted UF6 cylinders, and to improve...

63

Ash Handling System Maintenance Guide  

Science Conference Proceedings (OSTI)

This Ash Handling System Maintenance Guide provides fossil plant maintenance personnel with current maintenance information on this system. This guide will assist plant maintenance personnel in improving the reliability and reducing the maintenance costs for the ash handling system.

2005-12-23T23:59:59.000Z

64

General Maintenance Technician | Princeton Plasma Physics Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

Join Our Mailing List A Collaborative National Center for Fusion & Plasma Research Search form Search Search Home About Overview Learn More Visiting PPPL History...

65

Decontamination and decommissioning surveillance and maintenance report for FY 1991. Environmental Restoration Program  

SciTech Connect

The Decontamination and Decommissioning (D&D) Program has three distinct phases: (1) surveillance and maintenance (S&M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D&D is devoted to S&M at each of the sites. Our S&M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S&M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

Not Available

1991-12-01T23:59:59.000Z

66

Feedwater Heater Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides plant personnel with information on the operation, maintenance, and performance of feedwater heaters. The contents of this guide will assist plant personnel in improving feedwater heater reliability, performance, and maintenance practices.

2002-05-29T23:59:59.000Z

67

Maintenance and Veg Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Functions Infrastructure projects Interconnection OASIS OATT Reauthorization of Transmission Line Permits, Maintenance and Vegetation Management on Forest Service Lands...

68

Sootblowing Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information concerning good maintenance practices, condition monitoring, predictive and preventive techniques, probable failure modes, and troubleshooting guidance to personnel involved in the maintenance of sootblowing systems and their components. This guide was developed to provide basic information as well as detailed maintenance and troubleshooting information.

2001-12-20T23:59:59.000Z

69

Mining Surveillance and Maintenance Dollars  

Science Conference Proceedings (OSTI)

Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

MARTINEZ, R.

2000-02-01T23:59:59.000Z

70

Wind Turbine Lubrication Maintenance Guide  

Science Conference Proceedings (OSTI)

With the rush to develop todays massive wind energy sites, more attention should be paid to the inevitable need to perform routine maintenance and develop practical means of assessing the condition of the components within the nacelles and other outside support equipment for the wind farms. Current operating models have not adequately established accurate assumptions or expectations on the unavailability of the windmills and the impact on lost generation. Contracts for purchase of their generation output...

2012-06-20T23:59:59.000Z

71

`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES  

E-Print Network (OSTI)

the satisfaction of customers and profits. From a global perspective of lifecycle management, the role of (e)-maintenance maintenance actions. This idleness can be due to failures of some other elements in the system. More generally. But opportunistic maintenance can help save set-up costs and guarantee the expected performances for the system

Paris-Sud XI, Université de

72

Predictive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Maintenance Predictive Maintenance October 7, 2013 - 9:46am Addthis Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration. Predictive maintenance differs from preventive maintenance because maintenance is based on the condition of the machine instead of a preset schedule. This eliminates the unneeded maintenance concerns of preventive programs. Several predictive maintenance technologies are available. Federal agencies can leverage a combination of these technologies within their maintenance programs. Advantages A well-executed predictive maintenance program can almost eliminate catastrophic equipment failure because issues are identified and eliminated

73

DOE - Office of Legacy Management -- Mound Site  

Office of Legacy Management (LM)

Site Fairfield Site Falls City Site Fernald Preserve Gasbuggy Site General Atomics Geothermal Gnome-Coach Site Grand Junction Sites Granite City Site Green River Site Gunnison...

74

Maintenance Effectiveness Assessment  

Science Conference Proceedings (OSTI)

Utilities want to know whether their equipment is being maintained in the most effective manner. Understanding the relationship between maintenance costs and benefits becomes even more important when established practices and schedules change. This report defines the problem of and presents a roadmap for the development of metrics for evaluating substation equipment maintenance effectiveness. A proposed suite of tools for assessing maintenance effectiveness TAME can provide a business analytics framework...

2010-12-23T23:59:59.000Z

75

Status of fusion maintenance  

SciTech Connect

Effective maintenance will be an essential ingredient in determining fusion system productivity. This level of productivity will result only after close attention is paid to the entire system as an entity and appropriate integration of the elements is made. The status of fusion maintenance is reviewed in the context of the entire system. While there are many challenging developmental tasks ahead in fusion maintenance, the required technologies are available in several high-technology industries, including nuclear fission.

Fuller, G.M.

1984-01-01T23:59:59.000Z

76

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Sheet for 2013 Nissan Leaf Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 5142013 456 Replaced right front strut NC...

77

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

3CE000672 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 6102013 7,426...

78

RM Maintenance Services  

NLE Websites -- All DOE Office Websites (Extended Search)

maintenance forces are responsible for over 118 substations and almost 5300 miles of transmission lines. The Rocky Mountain Region recently updated its Metering Policy. Its...

79

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

0DU103929 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 342013 4,876 Replaced relay assembly, engine...

80

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

6DU111078 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2192013 8,362 Changed oil - under warranty...

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

XBU100914 Maintenance Sheet for 2011 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 6192012 14,694 Replaced one tire and rotated...

82

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

2DU113491 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2192013 8,466 Changed oil - under warranty...

83

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

XDU104313 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2182013 8,513 Changed oil - under warranty...

84

Substation Reliability Centered Maintenance  

SciTech Connect

Substation Reliability Centered Maintenance (RCM) is a technique that is used to develop maintenance plans and criteria so the operational capability of substation equipment is achieved, restored, or maintained. The objective of the RCM process is to focus attention on system equipment in a manner that leads to the formulation of an optimal maintenance plan. The RCM concept originated in the airline industry in the 1970s and has been used since 1985 to establish maintenance requirements for nuclear power plants. The RCM process is initially applied during the design and development phase of equipment or systems on the premise that reliability is a design characteristic. It is then reapplied, as necessary, during the operational phase to sustain a more optimal maintenance program based on actual field experiences. The purpose of the RCM process is to develop a maintenance program that provides desired or specified levels of operational safety and reliability at the lowest possible overall cost. The objectives are to predict or detect and correct incipient failures before they occur or before they develop into major defects, reduce the probability of failure, detect hidden problems, and improve the cost-effectiveness of the maintenance program. RCM accomplishes two basic purposes: (1) It identifies in real-time incipient equipment problems, averting potentially expensive catastrophic failures by communicating potential problems to appropriate system operators and maintenance personnel. (2) It provides decision support by recommending, identifying, and scheduling preventive maintenance. Recommendations are based on maintenance criteria, maintenance history, experience with similar equipment, real-time field data, and resource constraints. Hardware and software are used to accomplish these two purposes. The RCM system includes instrumentation that monitors critical substation equipment as well as computer software that helps analyze equipment data.

Purucker, S.L.

1992-11-01T23:59:59.000Z

85

Nuclear Maintenance Applications Center: Condenser Air Removal Equipment Maintenance Guide  

Science Conference Proceedings (OSTI)

The Condenser Air Removal Equipment Maintenance Guide provides power plant maintenance personnel with current maintenance information on this system. This guide will assist the plant maintenance personnel in improving reliability and reducing maintenance costs for the condenser air removal (CAR) equipment.

2007-12-21T23:59:59.000Z

86

Nuclear Maintenance Applications Center: Condenser Cleaning Equipment Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides power plant maintenance personnel with current maintenance information on condenser cleaning systems. The report will help these personnel to improve the reliability and reduce the maintenance costs for the condenser cleaning equipment used in power plants.

2007-12-21T23:59:59.000Z

87

Unit 16: Maintenance & Evolution To introduce the challenge of maintaining a  

E-Print Network (OSTI)

to deal with change ¥ Software maintenance - the general process of changing a system once it has been + 0.3IM)/100 #12;9 Techniques & tools for maintenance ¥ Key techniques Ð Configuration management Configuration management repositories When to stop maintenance? ¥ Is the cost of maintenance too high

Finkelstein, Anthony

88

Condenser Application and Maintenance Guide  

Science Conference Proceedings (OSTI)

The Condenser Application and Maintenance Guide provides plant personnel with information on the operation, maintenance, and performance of condensers. The contents of this guide will assist plants in improving condenser performance, reducing maintenance costs, and increasing condenser reliability.

2001-08-23T23:59:59.000Z

89

Maintenance | OpenEI Community  

Open Energy Info (EERE)

Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

90

Static Seals Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides comprehensive technical information on the understanding and maintenance of static seals. It is designed to help utility staffs maintain static seals and minimize and trouble shoot leakage problems that can reduce plant availability.

1994-09-22T23:59:59.000Z

91

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

0CE002590 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 1252013 7,925 Changed oil and filter and...

92

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

7CE000612 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 1172013 6,327 Changed oil and filter and...

93

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

5CE002486 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 212013 7,892 Changed oil and filter and...

94

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

8BU100815 Maintenance Sheet for 2011 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 882012 17,160 Changed oil and filter and...

95

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DU2A5010462 Maintenance Sheet for 2010 Toyota Prius Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 11232009 5,935 Changed oil and filter,...

96

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DU5A0006063 Maintenance Sheet for 2010 Toyota Prius Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 8192009 5,090 Changed oil and filter and...

97

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DP8D3038660 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6222013 6,331 5K service -...

98

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6132013 5,220 5K service - under...

99

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DP6D3038663 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6122013 5,078 5K service -...

100

Wind Turbine Maintenance Guide  

Science Conference Proceedings (OSTI)

This guideline provides component-level information regarding the maintenance of major components associated with a wind turbine. It combines recommendations offered by major equipment manufacturers with lessons learned from owner/operators of wind turbine facilities.

2012-06-29T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Nuclear Maintenance Applications Center: Maintenance and Modification Work Planner Training Program Description  

Science Conference Proceedings (OSTI)

The purpose of this report is to provide guidance for the development of a training program for the qualification of maintenance and modification work planners. The training program is intended to provide maintenance and modification work planners with the fundamental knowledge and skills required to prepare consistent, high quality packages aligned with site-specific and industry standards.This report provides a standard approach for developing and implementing a work planner training ...

2013-10-24T23:59:59.000Z

102

Nuclear Maintenance Applications Center: Feed Pump Turbine Maintenance Guide  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Steam Turbines and Auxiliaries Program 65 and the Nuclear Maintenance Application Center have developed a series of maintenance guides to assist plant personnel with the performance of various maintenance tasks associated with a wide variety of plant components. The objective of this project was to publish a maintenance guide for the feed pump turbines that included an ...

2012-09-25T23:59:59.000Z

103

Operations and Maintenance Development: Preventive Maintenance Program Implementation Self-Assessment Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Preventive maintenance (PM) programs throughout nuclear plants in the United States have evolved from strict compliance with the supplier's general recommendations (which are likely to be much too conservative) to more flexible tasks that are intended to accommodate plant-specific service conditions. During the 1990s, the industry, with support from the Electric Power Research Institute (EPRI), embarked on Preventive Maintenance Optimization (PMO) programs. Most utilities either have implemented or are i...

2007-12-20T23:59:59.000Z

104

Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy's (DOE's) Rocky Flats Site was established in 1951 as part of the United States' nationwide nuclear weapons complex to manufacture nuclear weapons components. In 1992 weapons production halted, and the Rocky Flats mission changed to include environmental investigations, cleanup, and site closure. In October 2005, DOE and its contractor completed an accelerated 10-year, $7 billion cleanup of chemical and radiological contamination left from nearly 50 years of production. The cleanup required the decommissioning, decontamination, demolition, and removal of more than 800 structures; removal of more than 500,000 cubic meters of low-level radioactive waste; and remediation of more than 360 potentially contaminated environmental sites. The final remedy for the site was selected in September 2006 and included institutional controls, physical controls, and continued monitoring for the former industrial portion of the site. The remainder of the site, which served as a buffer zone surrounding the former industrial area, was transferred to the U.S. Fish and Wildlife Service in July 2007 for a national wildlife refuge. DOE's Office of Legacy Management is responsible for the long-term surveillance and maintenance of Rocky Flats, which includes remedy implementation activities and general site maintenance. Several factors have complicated the transition from closure to post-closure at Rocky Flats. The early experiences associated with the two years since the physical cleanup and closure work were completed have led to several valuable lessons learned. (authors)

Surovchak, S. [U.S. Department of Energy, Office of Legacy Management, Westminster, CO (United States); Kaiser, L.; DiSalvo, R.; Boylan, J.; Squibb, G.; Nelson, J.; Darr, B.; Hanson, M. [S.M. Stoller Corporation, Westminster, CO (United States)

2008-07-01T23:59:59.000Z

105

Equipment Maintenance Optimization Manual Prototypes  

Science Conference Proceedings (OSTI)

This report provides detailed information to assist plant staff in performing recommended equipment maintenance tasks. It is a compilation of equipment maintenance optimization manual (EMOM) prototypes that include procedures and trouble shooting supported by broad-based utility experience. The EMOMs enable utility generation stations to: minimize operation and maintenance costs, including parts and labor; assist in maintenance planning, scheduling, and parts strategy; develop comprehensive maintenance m...

1999-11-24T23:59:59.000Z

106

TRUPACT-II Container Maintenance Program Plan  

Science Conference Proceedings (OSTI)

This document details the maintenance, repair, and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container in accordance with OM-134, TRUPACT-II Container Operations and Maintenance Manual; and the TRUPACT-II Container Certificate of Compliance (Number 9218). The routine shipping and receiving inspections required by the Department of Transportation (DOT), Department of Energy (DOE), Nuclear Regulatory Commission (NRC) and other regulations are not addressed in this document. This document applies to all DOE shipping and receiving sites that use the TRUPACT-II containers.

Not Available

1991-05-01T23:59:59.000Z

107

Proactive maintenance initiatives at Argonne National Laboratory-West  

SciTech Connect

In the late 1980`s, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ``mentor`` roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I&C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned.

Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

1995-06-01T23:59:59.000Z

108

FMAC: Coal-Handling Maintenance Guide  

Science Conference Proceedings (OSTI)

The Coal Handling System Maintenance Guide provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs for the coal handling system.

2006-12-22T23:59:59.000Z

109

Predictive Maintenance Assessment Guidelines  

Science Conference Proceedings (OSTI)

This document is the third in a series of guidelines designed to help electric power utilities develop programs that take advantage of diagnostic technologies used to detect problems in machinery. The PDM Assessment Guidelines provide the procedures necessary to plan and implement a plant wide predictive maintenance program.

1997-12-02T23:59:59.000Z

110

CH Packaging Maintenance Manual  

SciTech Connect

This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests.

Washington TRU Solutions

2002-01-02T23:59:59.000Z

111

Lawn Maintenance Safety  

E-Print Network (OSTI)

Most homeowners do not consider lawn maintenance to be dangerous. However lawn mowers, trimmers, edgers and other power equipment can cause minor to severe burns and lacerations, broken and dislocated bones, eye injuries and loss of fingers, toes and legs. You can avoid accidents like these by following the safety guidelines in this publication.

Smith, David

2005-07-12T23:59:59.000Z

112

Preventive Maintenance Programs  

Science Conference Proceedings (OSTI)

...and specifications Operator, service, and repair manuals Lubricant type Filter specifications Wear components, especially material survey data Prior service and maintenance reports to identify problem Establish sampling and sample handling procedures Design and document sampling methods, such as in-live...

113

DOE - Office of Legacy Management -- Grand Junction Sites  

Office of Legacy Management (LM)

Site Fairfield Site Falls City Site Fernald Preserve Gasbuggy Site General Atomics Geothermal Gnome-Coach Site Grand Junction Sites Granite City Site Green River Site Gunnison...

114

DOE - Office of Legacy Management -- Oxford OH Site - OH 22  

Office of Legacy Management (LM)

Site Fairfield Site Falls City Site Fernald Preserve Gasbuggy Site General Atomics Geothermal Gnome-Coach Site Grand Junction Sites Granite City Site Green River Site Gunnison...

115

DOE - Office of Legacy Management -- Maywood Site - NJ 10  

Office of Legacy Management (LM)

Site Fairfield Site Falls City Site Fernald Preserve Gasbuggy Site General Atomics Geothermal Gnome-Coach Site Grand Junction Sites Granite City Site Green River Site Gunnison...

116

DOE - Office of Legacy Management -- Seymour CT Site - CT 02  

Office of Legacy Management (LM)

Site Fairfield Site Falls City Site Fernald Preserve Gasbuggy Site General Atomics Geothermal Gnome-Coach Site Grand Junction Sites Granite City Site Green River Site Gunnison...

117

DOE - Office of Legacy Management -- Niagara Falls Storage Site...  

Office of Legacy Management (LM)

Site Fairfield Site Falls City Site Fernald Preserve Gasbuggy Site General Atomics Geothermal Gnome-Coach Site Grand Junction Sites Granite City Site Green River Site Gunnison...

118

Maintenance Work Management -- Best Practices Guidelines: Maintenance Assessment and Improvement  

Science Conference Proceedings (OSTI)

This report on maintenance work management best practices is part of EPRI's Plant Maintenance Optimization (PMO) development efforts. Based on a series of assessment and improvement projects, the report describes the process and typical results.

1998-03-12T23:59:59.000Z

119

Nuclear Maintenance Applications Center: Heat Exchanger Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides plant personnel with information on the operation, maintenance, and performance of heat exchangers. The contents of this guide will assist plant personnel in improving heat exchanger reliability, performance, and maintenance practices.

2009-06-14T23:59:59.000Z

120

USE OF THE DRY MAINTENANCE FACILITY FOR HRT MAINTENANCE  

SciTech Connect

A portable shield was utilized in performing nine semidirect dry maintenance jobs on the HRT. The shield proved to be completely reliable, affording a considerable savings in maintenance costs and reactor downtime. (auth)

Jarvis, J.P.

1962-09-17T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.  

DOE Green Energy (OSTI)

Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

Wick, Mike

2008-12-30T23:59:59.000Z

122

Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance  

Office of Legacy Management (LM)

Calendar Year 2013 October 2013 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-2nd...

123

Operations and Maintenance Manual | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manual Manual Operations and Maintenance Manual October 16, 2013 - 5:00pm Addthis Closeout of the construction phase for renewable energy projects includes the creation of a comprehensive operations and maintenance (O&M) manual. Although specific content varies depending on the size, scope, and complexity of the project, the O&M manual typically includes manufacturer literature, basic operating procedures, troubleshooting techniques, measurement and verification (M&V) system documentation, and maintenance information. The general contractor should compile O&M documentation, gather as-built drawings for equipment and systems, and take the lead in organizing the manual. The commissioning agent reviews the manual to verify that it includes all necessary documentation, including:

124

Kalispell Maintenance Headquarters Project : Environmental Assessment.  

Science Conference Proceedings (OSTI)

The facilities needed to maintain and repair Bonneville Power Administration (BPA's) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area's maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

United States. Bonneville Power Administration.

1991-01-01T23:59:59.000Z

125

Computerized Maintenance Management System and Maintenance Work Process Integration  

Science Conference Proceedings (OSTI)

A Computerized Maintenance Management System (CMMS) is an information and communication tool supporting the maintenance work process within an industrial plant. Though these types of systems are found in various industries, no report has existed describing CMMS integration within a utility environment. This guideline describes how to integrate a CMMS with the methods, procedures, work processes, and overall maintenance in a power plant.

1998-04-29T23:59:59.000Z

126

Safety assured financial evaluation of maintenance  

E-Print Network (OSTI)

Management decisions in complex industrial facilities usually consider both the economic and environmental aspects of the plant's performance. For nuclear power plants (NPPs), safety is also a very substantial issue. The objectives of this dissertation are to develop and demonstrate a novel useful conceptual model that could be used to allocate maintenance funds for a nuclear power plant in such a way as to meet all specified safety requirements and objectives, while achieving a high degree of economic performance. The model is based on the general theory that the reliability of a plant at any time is a function of its initial reliability and the maintenance history of the individual plant components (Smith, 1997). Such a model can assist in evaluating strategic management decisions regarding allocation of funds for nuclear power plant maintenance. It could be used as a simulation tool; various scenarios could be studied to answer "what if" questions. Simulations of this type will allow a better understanding of the relationship between maintenance, economic performance, and safety, and consequently will lead to better decision making. The novelty of this model is tied to the intimate relationship that it develops between maintenance activities at a nuclear plant, and their relationship to prescribed safety requirements and to the economic performance of that plant.

Erguina, Vera

2005-05-01T23:59:59.000Z

127

care and maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Care and Maintenance of the Prairie Parcel Care and Maintenance of the Prairie Parcel Now that your prairie parcel is up and growing, there are just a few concerns that you should consider about its care. Weeding The question of weeding is really just a matter of aesthetics. You do not have to weed your parcel. If your parcel is a large one, weeding may not even be practical. Although the "weed" species will dominate your parcel for the first few years, they will give way to the native plant species. You can liken the native plants to long distance runners; they appear to start off slowly, but end up winning the ecological race. After all, they are the plants that are genetically-suited and adapted to growing in this environment. The native prairie plants will be developing extensive root structure the

128

HVAC Maintenance and Technologies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC - HVAC - Maintenance and Technologies Federal Utility Partnership Working Group Meeting Providence, Rhode Island April 15, 2010 BY Ramin Faramarzi, P.E. Technology Test Centers (TTC) Design and Engineering Services Southern California Edison (SCE) www.sce.com/rttc 2 Outline * Introduction to SCE's TTC * Overview of energy challenges in California (CA) * Role of HVAC in CA's energy and demand equations * Factors affecting HVAC performance * Focus on SCE's research on maintenance faults * Next generation of HVAC equipment * HVAC technologies on SCE's TTC radar * Black boxes - do they all work? 3 SCE's Technology Test Centers * SCE applied research facilities located in Irwindale, CA comprised of 3 test beds: * Refrigeration * HVAC * Lighting * Coming Soon! - A new ZNE lab 4 Refrigeration Testing

129

Terminal automation system maintenance  

SciTech Connect

Nothing has improved petroleum product loading in recent years more than terminal automation systems. The presence of terminal automation systems (TAS) at loading racks has increased operational efficiency and safety and enhanced their accounting and management capabilities. However, like all finite systems, they occasionally malfunction or fail. Proper servicing and maintenance can minimize this. And in the unlikely event a TAS breakdown does occur, prompt and effective troubleshooting can reduce its impact on terminal productivity. To accommodate around-the-clock loading at racks, increasingly unattended by terminal personnel, TAS maintenance, servicing and troubleshooting has become increasingly demanding. It has also become increasingly important. After 15 years of trial and error at petroleum and petrochemical storage and transfer terminals, a number of successful troubleshooting programs have been developed. These include 24-hour {open_quotes}help hotlines,{close_quotes} internal (terminal company) and external (supplier) support staff, and {open_quotes}layered{close_quotes} support. These programs are described.

Coffelt, D.; Hewitt, J. [Engineered Systems Inc., Tempe, AZ (United States)

1997-01-01T23:59:59.000Z

130

Main Generator Rotor Maintenance  

Science Conference Proceedings (OSTI)

Main generator rotors are constructed and designed to provide decades of reliable and trouble-free operation. However, a number of incidences have occurred over the years that can adversely impact reliable operation of generator rotors and, ultimately, production of electrical power. This report is a guide for power plant personnel responsible for reliable operation and maintenance of main generators. As a guide, this report provides knowledge and experience from generator experts working at power plants...

2006-11-27T23:59:59.000Z

131

Reactive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reactive Maintenance Reactive Maintenance Reactive Maintenance October 7, 2013 - 9:40am Addthis Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities. Advantages Reactive maintenance advantages are a double-edged sword. Federal agencies following a purely reactive maintenance strategy can expect little expenditures for manpower or system upkeep until something breaks. However, systems do break. With new equipment, Federal agencies can expect minimal incidents of failure. However, older equipment often experiences higher failure incidents and costlier repairs. Other advantages of reactive maintenance are:

132

Maintenance FUSION IGNITION RESEARCH EXPERIMENT  

E-Print Network (OSTI)

to refine the system details, interfaces and the requirements for remote handling. Table 1. FIRE RadialInsulation Enclosure Remote Maintenance Module FUSION IGNITION RESEARCH EXPERIMENT SYSTEM objectives and subsystem requirements in an arrangement that allows remote maintenance of in

133

Preventive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preventive Maintenance Preventive Maintenance Preventive Maintenance October 7, 2013 - 9:44am Addthis Preventive maintenance aims to sustain or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time. Advantages Federal agencies can greatly extend equipment reliability and lifespan by expending the necessary resources for regular maintenance. In most cases, the system designer or manufacturer outlines regular maintenance under a preventive strategy. In addition to increased reliability and lifespan, budget is saved over the life of the system. Preventive maintenance programs can save as much as 12% to 18% in equipment repair and replacement. Other advantages of preventitive maintenance are:

134

Second Line of Defense Help Desk: Electronic Maintenance Reports - Local Maintenance Provider User Guide Rev. 1  

Science Conference Proceedings (OSTI)

The Electronic Maintenance Report forms present a uniform dataset for analysis of Sustainability metrics. These forms collect readily minable data while allowing the attachment of site-specific checklists or other supporting files for review by the Sustainability Manager and Program Management.

Leigh, Richard J.

2011-12-14T23:59:59.000Z

135

An Ontology-based Model for providing Semantic Maintenance Aristeidis Matsokis*, Mohamed Hedi Karray**,  

E-Print Network (OSTI)

systems for better management of maintenance activities. The new model described in this paper is named information system and the maintenance process. These are: the monitoring management model; the site: Maintenance is becoming more and more crucial in Asset Lifecycle Management information models. Issues

Paris-Sud XI, Université de

136

Electric Motor Tiered Maintenance Program  

Science Conference Proceedings (OSTI)

Electric motor predictive and preventive maintenance guidance has been developed to provide information to help maximize motor reliability and to minimize the need for major motor repairs. However, if all recommendations presented in most guides are followed and applied to all motors, the cost of motor maintenance would be unwieldy and consume more than its share of maintenance budgets.

2002-08-27T23:59:59.000Z

137

Bottom Ash System Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to personnel involved in the bottom ash system and its components, including good maintenance practices, condition monitoring, predictive and preventive maintenance techniques, probable failure modes, and troubleshooting guidance. The guide was developed primarily to provide detailed maintenance and troubleshooting information but also includes basic system information.

2000-10-31T23:59:59.000Z

138

Predictive Maintenance Program Implementation Experience  

Science Conference Proceedings (OSTI)

Predictive maintenance (PDM) is a process of collecting data, assessing machinery condition, and deciding when to perform maintenance. PDM saves money and improves machinery reliability as compared to preventive or corrective maintenance. This report describes the implementation of PDM programs at Commonwealth Edison's (ComEd's) fossil power plants.

1998-12-29T23:59:59.000Z

139

Compressed Air System Maintenance Guide  

Science Conference Proceedings (OSTI)

The "Compressed Air System Maintenance Guide" provides fossil plant personnel with information on the operation and maintenance of the compressed air system. The contents of this guide will assist personnel in improving performance of the compressed air system, reducing maintenance costs, and increasing air system reliability.

2002-11-27T23:59:59.000Z

140

Design of a maintenance and operations recommender  

E-Print Network (OSTI)

from computerized maintenance management systems (CMMS)use computerized maintenance management systems (CMMS) andmanagement and control systems (EMCS) to recom- mend what maintenance

Federspiel, C.; Villafana, L.

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

HVAC Maintenance and Technologies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC Maintenance and Technologies HVAC Maintenance and Technologies Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility...

142

Wind Energy Asynchronous Generator Maintenance Guidelines  

Science Conference Proceedings (OSTI)

With the rush to develop todays massive wind energy sites, little attention is being given to the inevitable need to perform routine maintenance and develop practical means of assessing the condition of the components within the nacelles and other outside support equipment for the wind farms. Current operating models have not adequately established accurate assumptions or expectations on the unavailability of the wind turbines and the impact on lost generation. Contracts for purchase of their generation ...

2012-06-20T23:59:59.000Z

143

Opportune maintenance and predictive maintenance decision support douard Thomas, ric Levrat, Benoit Iung, Pierre Cocheteux  

E-Print Network (OSTI)

to several ones. Keywords: Predictive maintenance, Maintenance engineering, Decision making, Complex systems be answered by using maintenance engineering, and more specifically a computerised maintenance management system that collects the information related to the different maintenance actions. Finally the second

Paris-Sud XI, Université de

144

Federal Energy Management Program: Maintenance Types  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Types Maintenance Types to someone by E-mail Share Federal Energy Management Program: Maintenance Types on Facebook Tweet about Federal Energy Management Program: Maintenance Types on Twitter Bookmark Federal Energy Management Program: Maintenance Types on Google Bookmark Federal Energy Management Program: Maintenance Types on Delicious Rank Federal Energy Management Program: Maintenance Types on Digg Find More places to share Federal Energy Management Program: Maintenance Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources Contacts

145

Software maintenance maturity model (smmm): the software maintenance process model  

E-Print Network (OSTI)

This paper summarizes the research work leading to a Phd thesis that addresses the assessment and improvement of the software maintenance function by proposing a maturity model for daily software maintenance activities: Software Maintenance Maturity Model (SM mm) as well as its supporting knowledge based system SM Xpert. The software maintenance function suffers from a scarcity of management models to facilitate its evaluation, management, and continuous improvement. The SM mm addresses the unique activities of software maintenance while preserving a structure similar to that of the CMMi ©1 maturity model. It is designed to be used as a complement to this model. The SM mm is based on practitioners ’ experience, international standards, and the seminal literature on software maintenance. This paper presents the model’s purpose, scope, foundation, and architecture, followed by a knowledgebased system to help software maintainers learn and use the maturity model. 1.

Alain April; Jean-marc Desharnais

2005-01-01T23:59:59.000Z

146

Generation Maintenance Applications Center: Conventional Vertical Pump Maintenance Guide  

Science Conference Proceedings (OSTI)

Vertical pumps are used in several applications in power plants, such as condensate, heater drain, circulating water, and service water/river water applications.BackgroundThe Maintenance Issue Surveys of the Electric Power Research Institute (EPRI) Generation Maintenance Applications Center (GenMAC) indicate that members are experiencing difficulties with various maintenance issues associated with vertical pumps. Some of the problems identified a need for ...

2013-12-19T23:59:59.000Z

147

Nuclear Maintenance Applications Center: Isolated Phase Bus Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides information on design, operating experience, and maintenance practices associated with the isophase bus system. The information is meant to be useful for system engineers, component engineers, maintenance personnel, and their supervision in understanding and maintaining this system. This document is an update to Isolated Phase Bus Maintenance Guide (EPRI report TR-112784), and the scope has been expanded to include boundary components, such as potential transformers (PTs) and current...

2007-12-20T23:59:59.000Z

148

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft July 9, 2009 Draft July 9, 2009 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2009 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

149

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final July 01, 2010 Final July 01, 2010 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2010 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

150

Requirements-Based Surveillance and Maintenance Review Guide | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Use of the Guidance Manual This manual was developed to provide organizations with the knowledge and tools necessary to perform a disciplined and thorough Requirements-Based Surveillance and Maintenance (RBSM) review at any given facility or site in order to cost effectively manage S&M activities. Sections 1.0, 2.0 and 3.0 of this manual provide a brief explanation of what the RBSM review process is, why such a process is needed and the steps a facility or site should take to get organized and initiate an RBSM review. Sections 4.0 and 5.0 of this manual discuss the use of the data gained from the RBSM review process like the development of cost reduction strategies and the development of

151

Management Applications of Maintenance Reports  

E-Print Network (OSTI)

The good computerized maintenance management systems available today provide Plant Engineers with sufficient data to institute policies and procedures to materially affect the company profits. Regrettably, the vast majority of these Engineers and their Maintenance Managers seem content to simply produce PM work orders, maintenance equipment repair histories and generate a few activity reports. A straightforward and practical application of the available cost and performance data enables maintenance management to constantly fine tune operational procedures to minimize cost and equipment failure from the available data. Using this data, the manager can easily measure the total effect of maintenance on his company's overall performance. The practical application of this data to reduce overall maintenance cost and to increase equipment availability is discussed in this paper.

Gehl, P.

1993-03-01T23:59:59.000Z

152

Mechanical Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

153

Equipment Maintenance Optimization Manual Applications  

Science Conference Proceedings (OSTI)

This report is a compilation of Equipment Maintenance Optimization Manuals (EMOMs) that include procedures and troubleshooting supported by broad-based utility experience. EMOMs for critical generating station equipment allows power generating plants to replace existing maintenance practices with the latest industry best practices. Using this information as a benchmark, current practices can be validated or adjusted for more optimum performance of the overall maintenance process. In addition, the EMOMs c...

2001-12-21T23:59:59.000Z

154

Sustainability of green space maintenance  

E-Print Network (OSTI)

In Japan, recent changes in socio-economic and political structures -- decreasing tax revenue, declining communication among community members, and privatization of public services-- have influenced existing maintenance ...

Nomura, Wataru

2011-01-01T23:59:59.000Z

155

Conference Center and APS Site Activity Coordination  

NLE Websites -- All DOE Office Websites (Extended Search)

and Emergency Management Database Maintenance Personnel Conference Center and APS Site Activity Coordination Locations Conference Center - E1100E1200, Auditorium, Gallery A1100...

156

Reliability-Centered Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability-Centered Maintenance Reliability-Centered Maintenance Reliability-Centered Maintenance October 7, 2013 - 9:48am Addthis Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance. The difference is that reliability-centered maintenance recognizes that: Equipment design and operations differ Different equipment has different probabilities of failure All equipment is not of equal importance to facility operations Facilities have limited financial and personnel resources. While reliability-centered maintenance relies on predictive maintenance practices and technologies, it also recognizes that maintenance on inexpensive and/or unimportant equipment may be better served by a reactive or predictive maintenance approach. Each of the aforementioned factors are

157

Federal Energy Management Program: Reactive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Reactive Reactive Maintenance to someone by E-mail Share Federal Energy Management Program: Reactive Maintenance on Facebook Tweet about Federal Energy Management Program: Reactive Maintenance on Twitter Bookmark Federal Energy Management Program: Reactive Maintenance on Google Bookmark Federal Energy Management Program: Reactive Maintenance on Delicious Rank Federal Energy Management Program: Reactive Maintenance on Digg Find More places to share Federal Energy Management Program: Reactive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

158

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance on Google Bookmark Federal Energy Management Program: Operations and Maintenance on Delicious Rank Federal Energy Management Program: Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources

159

Federal Energy Management Program: Preventive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Preventive Preventive Maintenance to someone by E-mail Share Federal Energy Management Program: Preventive Maintenance on Facebook Tweet about Federal Energy Management Program: Preventive Maintenance on Twitter Bookmark Federal Energy Management Program: Preventive Maintenance on Google Bookmark Federal Energy Management Program: Preventive Maintenance on Delicious Rank Federal Energy Management Program: Preventive Maintenance on Digg Find More places to share Federal Energy Management Program: Preventive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

160

Nuclear Maintenance Applications Center: Reactor Recirculation Pump Seal Maintenance Guide  

Science Conference Proceedings (OSTI)

In 1993, the Electric Power Research Institute (EPRI) published Main Coolant Pump Seal Maintenance Guide (report TR-100855). That report provides guidance on maintenance and troubleshooting of main coolant pump seals but was generic in naturethe information was relevant to pressurized water reactors (PWRs) and boiling water reactors (BWRs).

2008-12-18T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Nuclear Maintenance Applications Center: Emergency Diesel Generator Condition- Based Maintenance  

Science Conference Proceedings (OSTI)

Condition-based maintenance practices that were developed in the United States in the 1990s for emergency diesel generators (EDGs) have not been fully adopted by international nuclear plant operators. To encourage broader use of such practices, NMAC formed a technical advisory group of international utilities interested in learning more about condition-based EDG maintenance practices.

2008-12-19T23:59:59.000Z

162

TRUPACT-II container maintenance program plan  

SciTech Connect

This document details the maintenance/repair and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container, in accordance with requirements of the TRUPACT-II Container Operations and Maintenance Manual, OM-134, the TRUPACT-II Container Safety Analysis Report (SARP), and the TRUPACT-II Container Certificate of Compliance (Number 9218). The routine shipping and receiving inspections required by the Department of Transportation (DOT), Department of Energy (DOE), Nuclear Regulatory Commission (NRC) and other regulations are not addressed in this document. This document applies to all DOE shipping and receiving sites that use the TRUPACT-II containers.

Not Available

1990-11-01T23:59:59.000Z

163

Operations and Maintenance Training | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Training Operations and Maintenance Training October 16, 2013 - 5:01pm Addthis Key Actions in O&M Training Have O&M staff shadow Commissioning Agent during commissioning for early interaction with new renewable energy equipment. Train facility staff fully on O&M manual and building systems, regardless of O&M contracts on renewable energy systems. Provide key facility staff with general renewable energy and LEED training prior to building start-up. Look for opportunities for O&M staff to learn from external O&M contractors. To keep a renewable energy system performing at optimal levels, operations and maintenance (O&M) personnel must receive thorough training. A renewable energy system may be properly installed, but without a robust O&M program in place, it will not perform as specified over the long-term.

164

Achieving world class maintenance status  

Science Conference Proceedings (OSTI)

The article written by a management consultant, discusses the art of successful planning and operation of maintenance in mines considering factors such as benchmaking, key performance indices (KPIs) and frequency of procedures which can help achieve 'world class maintenance'. 1 fig.

Tomlingson, P.D. [Paul D. Tomingson Associates (United States)

2007-08-15T23:59:59.000Z

165

OpenEI Community - Maintenance  

Open Energy Info (EERE)

maintenance maintenance March 8-9, 2013 http://en.openei.org/community/blog/openei-maintenance-march-8-9-2013  We would like to inform the OpenEI community that OpenEI will be undergoing a significant software upgrade during a maintenance window this weekend.  We will be upgrading the wiki and semantic mediawiki portions of OpenEI, which means /datasets, /apps, /lod, /sparql and /community will continue to function normally.  Additionally, web services that rely on Ask queries (utility rate database API) may have some downtime as we transition.maintenance-march-8-9-2013" target="_blank">read more

166

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

7BA003539 7BA003539 Maintenance Sheet for 2011 Hyundai Sonata Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 7/19/2011 5,720 Changed oil and filter $14.67 10/12/2011 11,152 Changed oil and filter and rotated tires $60.49 10/21/2011 12,342 Upgraded ECU (TG5), replaced NVLD pressure sensor (TG6), and replaced cooling fan resistor (TG8) warranty 11/21/2011 16,442 Changed oil and filter $43.22 12/20/2011 22,497 Changed oil and filter and rotated tires $56.85 1/24/2012 28,205 Changed oil and filter $41.85 2/6/2012 30,100 30K service $109.16 2/9/2012 30,460 Recall: replaced two high voltage connectors at the HPCU n/c 2/27/2012 33,208 Changed oil and filter and rotated tires $56.85 3/24/2012 40,809 Changed oil and filter $41.85 4/20/2012 47,580 Changed oil and filter and rotated tires

167

Federal Energy Management Program: Predictive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

to someone by E-mail to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance on Facebook Tweet about Federal Energy Management Program: Predictive Maintenance on Twitter Bookmark Federal Energy Management Program: Predictive Maintenance on Google Bookmark Federal Energy Management Program: Predictive Maintenance on Delicious Rank Federal Energy Management Program: Predictive Maintenance on Digg Find More places to share Federal Energy Management Program: Predictive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources

168

Institute for Software Technology Maintenance Proze  

E-Print Network (OSTI)

Maintenance Institute for Software Technology Ersatz es bestehenden Systems Idee: Maintenance ist teuer. Durch! #12;VU Software Maintenance Institute for Software Technology Fehler im neuen System Software ist Management berücksichtigt Maintenance-Ziele und Rahmenbedingungen VU Software Maintenance Institute

169

Generation Maintenance Application Center: Combined Cycle Combustion Turbine Continuous Emissions Monitoring Maintenance Guide  

Science Conference Proceedings (OSTI)

Combustion turbine combined cycle (CTCC) facilities utilize various components that are unique to these types of power-generation plants and that are not typically found in a nuclear or fossil-power plant.  As such, use of the EPRI PM Basis Database (PMDB) by current owners of CTCC facilities is limited to only those components that are common to both types of power plants and already in the database.  With the projected growth in the number of CTCC facilities, EPRI General Maintenance ...

2012-12-31T23:59:59.000Z

170

Nuclear Maintenance Applications Center: Maintenance Engineer Fundamentals Handbook  

Science Conference Proceedings (OSTI)

Power plant engineering is a specialized form of engineering not usually taught in universities. In an effort to provide degreed mechanical, electrical, chemical, civil, and nuclear engineers and maintenance specialists the practical information needed to quickly become effective plant engineers, the Electric Power Research Institute (EPRI) developed the Maintenance Engineer Fundamentals Handbook: An EPRI Course (TR-106853) and corresponding training course in 1996. As the retirement rate of today's hig...

2007-12-20T23:59:59.000Z

171

Nuclear Maintenance Applications Center: Preventive Maintenance Program Guideline  

Science Conference Proceedings (OSTI)

Over the years, the Electric Power Research Institute (EPRI) has developed many technical documents to aid in developing effective preventive, predictive, and condition monitoring maintenance programs to ensure equipment reliability and availability. The industry has drawn on this information to establish or enhance preventive maintenance (PM) programs. However, not all PM program processes have been implemented, leaving some programs marginally effective and vulnerable to failure. The purpose of this re...

2011-07-11T23:59:59.000Z

172

Nuclear Maintenance Applications Center: Crane Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

This report is an update to the original guideline, published in December 2000 as Electric Power Research Institute (EPRI) report 1000986, and supersedes it in its entirety. This updated guide provides technical, maintenance, operational, training, inspection, and troubleshooting information for overhead bridge cranes used in nuclear power plants. Individual utilities can use this guide as a reference document that provides detailed component information, in-depth overhead bridge crane maintenance practi...

2011-03-07T23:59:59.000Z

173

Maintenance-free automotive battery  

SciTech Connect

Two types of maintenance-free automotive batteries were developed by Japan Storage Battery Co. to obtain a maintenance-free battery for practical use and to prevent deterioration of the battery during long storage and/or shipment. Design considerations included a special grid alloy, the separator, plate surface area, vent structure, and electrolyte. Charge characteristics, overcharge characteristics, life characteristics under various conditions, and self-discharge characteristics are presented. The characteristics of the maintenance-free battery with a Pb-Ca alloy grid are superior to those of a conventional battery. 10 figures, 1 table. (RWR)

Kano, S.; Ando, K.

1978-01-01T23:59:59.000Z

174

Programmatic agreement among the USDOE/RL Operations Office, the Advisory Council on Historic Preservation, and the WA State Historic Preservation Office for the maintenance, deactivation, alteration and demolition of the built environment on the Hanford Site, Washington  

SciTech Connect

This Programmatic Agreement (PA) addresses the built environment (i.e., buildings and structures) constructed during the Manhattan Project and Cold War Era periods of Hanford`s operational history. As such it encompasses the years 1943 through 1990. The identification, evaluation, and treatment of buildings and historic archeological remains on the Hanford Site predating 1943 will be accomplished through Sections 800.4 through 800.6 of the Council`s regulations. This PA will be in effect from the date of signature until September 30, 2000. Completion of the Sitewide Treatment Plan established under this PA satisfies all Section 106 requirements for identification, evaluation, and treatment necessary for all undertakings, up to and including demolition which may affect Manhattan Project and Cold War Era properties. This PA may be extended if the Sitewide Treatment Plan has not been completed by the end of FY 2000. Identification, evaluation, and treatment of properties constructed on the Hanford Site after 1990 will be handled pursuant to the regulations in effect at the time such properties are eligible for review.

Lloyd, D.W.

1997-08-01T23:59:59.000Z

175

Predictive Maintenance Primer: Revision to NP-7205  

Science Conference Proceedings (OSTI)

The "Predictive Maintenance Primer" revision provides nuclear plant personnel with current information regarding the predictive maintenance technologies and their applications. This guide will assist a plant in improving its predictive maintenance program.

2003-11-06T23:59:59.000Z

176

Optimal scheduling of fighter aircraft maintenance  

E-Print Network (OSTI)

The effective scheduling of fighter aircraft maintenance in the Air Force is crucial to overall mission accomplishment. An effective maintenance scheduling policy maximizes the use of maintenance resources and aircraft ...

Cho, Philip Y

2011-01-01T23:59:59.000Z

177

Robust Maintenance Policies in Asset Management  

E-Print Network (OSTI)

Optimal Maintenance and Repair Policies in Asset ManagementROBUST MAINTENANCE POLICIES IN ASSET MANAGEMENT Kenneth D.management policies and shows how the proposed approach may reduce maintenance and

Kuhn, Kenneth D.; Madanat, Samer M.

2005-01-01T23:59:59.000Z

178

Photovoltaic Operation and Maintenance Evaluation  

Science Conference Proceedings (OSTI)

Results from this study confirm that photovoltaic power plants require low operating and maintenance costs per kilowatthour. Projections based on these results suggest that in the future costs will fall below 0.5 cent per kilowatthour.

1990-01-11T23:59:59.000Z

179

HEV Fleet Testing Maintenance Sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

Bicyclist rams vehicle denting hood. Damage not repaired. (not included in maintenance costs) ---- 10292002 9,594 Oil change 20.67 1242003 12,953 Oil change 20.67 623...

180

An Outlook on Truth Maintenance  

E-Print Network (OSTI)

Truth maintenance systems have been used in several recent problem solving systems to record justifications for deduced assertions, to track down the assumptions which underlie contradictions when they arise, and to ...

McAllester, David A.

1980-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

U.S. Department of Energy Office of Inspector General report on audit of the Department of Energy`s Site Safeguards and Security Plans  

Science Conference Proceedings (OSTI)

The Department of Energy (Department) is required to protect its nuclear facilities from unauthorized access and theft, diversion, or destruction of special nuclear materials such as plutonium and uranium-235. The steps taken by the field sites to meet these requirements are outlined in a document entitled the ``Site Safeguards and Security Plan`` (SSSP). The authors initiated the audit at the request of the Office of Nonproliferation and National Security to evaluate the progress made in the SSSP process. The audit was performed to determine whether SSSP guidance was used as policy to evaluate and approve the site plans and whether new security requirements established by the guidance were justified. Of the five locations visited, three had identified facilities that would be pushed above the Office of Safeguards and Security`s acceptable level of low risk when new security (consequence) values were incorporated. Each of the sites will need to devise and install additional compensatory measures because of the increase in consequence values. The authors recommended that the Office of Nonproliferation and National Security discontinue using guidance as policy for evaluation, approval, and concurrence of Site Safeguards and Security Plans until they had been formally coordinated and concurred on by program and field elements. They also recommended that all proposed policy changes and guidance, when used as policy, be coordinated with affected program and field offices through the Department`s Directives System.

NONE

1995-12-01T23:59:59.000Z

182

site_transition.cdr  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Legacy Legacy Management U.S. DEPARTMENT OF This fact sheet explains the process for transferring a site to the U.S. Department of Energy Office of Legacy Management. Site Transition Process Upon Cleanup Completion Introduction Transition Process After environmental remediation is completed at a site and there is no continuing mission, responsibility for the site and the associated records are transferred to the U.S. Department of Energy (DOE) Office of Legacy Management for post-closure management. Where residual hazards (e.g., disposal cells, ground water contamination) remain, active long-term surveillance and maintenance will be required to ensure protection of human health and the environment. The DOE Office of Legacy Management (LM) established transition guidance for remediated sites that will transfer to LM for long-term surveillance and maintenance. The

183

Operational and maintenance instruction manual for the Ingham County Geriatric Medical Care Facility solar water-heating system  

DOE Green Energy (OSTI)

The Ingham County solar system consists of approximately 10,000 square feet of solar collectors connected in a closed configuration loop. The primary loop solution is a 1:12 mixture of water and propylene glycol which flows through the tube side of a heat exchanger connected to the primary storage tank. The heat energy which is supplied to the primary storage tank is subsequently used to preheat the temperature of the laundry water, kitchen water, and domestic potable water. Included in this report are: detailed drawings and flow chart; operational methodology; preventive maintenance instructions; general instructions and safety precautions; and a corrective maintenance and tabulation of failure modes. Appendices include: manufacturers technical manual and component specifications; IBM data sensors and responsibilities; digital county monitor operations manual; and on site monitor operations manual. Reference CAPE-2834. (LS)

Not Available

1983-07-29T23:59:59.000Z

184

TRUPACT-II Operating and Maintenance Instructions  

SciTech Connect

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

Westinghouse Electric Corporation, Waste Isolation Division

1999-12-31T23:59:59.000Z

185

Maintenance of DOE Technical Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TECHNICAL STANDARDS TECHNICAL STANDARDS PROGRAM PROCEDURES DOE-TSPP-9 Revision: 5 Date: August 1, 2000 MAINTENANCE OF DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-9 Maintenance Revision: 5 Date: August 1, 2000 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1

186

Condition-Based Maintenance Guideline  

Science Conference Proceedings (OSTI)

Since the 1980s, EPRI has published various documents relating to predictive or condition-based maintenance (CBM) programs. These documents have served as a foundation for predictive maintenance programs within our industry. Many of these published documents are now more than 10 years old. As a result, EPRI is reviewing these documents to compare them with current practices and programs. EPRIs initial goal is to revise and update the guidance and create a principal core document on predictive and conditi...

2011-11-16T23:59:59.000Z

187

Federal Energy Management Program: Computerized Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Computerized Maintenance Management Systems to someone by E-mail Share Federal Energy Management Program: Computerized Maintenance Management Systems on Facebook Tweet about Federal Energy Management Program: Computerized Maintenance Management Systems on Twitter Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Google Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Delicious Rank Federal Energy Management Program: Computerized Maintenance Management Systems on Digg Find More places to share Federal Energy Management Program: Computerized Maintenance Management Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

188

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Program Management to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Management on Facebook Tweet about...

189

Federal Energy Management Program: Computerized Maintenance Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Maintenance Management Systems Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and...

190

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Find out about effective metering at Federal facilities Computerized Maintenance Management Systems: Learn about the evaluation and integration of these systems Maintenance...

191

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Best Practices Guide to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Best Practices Guide on Facebook Tweet about...

192

Trimble Site Positioning and Machine Control Solutions  

E-Print Network (OSTI)

Designer Data ManagerProject Manager Supervisor #12;Site Positioning SystemSite Positioning System Productivity Analysis Management Trimble Construct. Manager Equipment Use Maintenance Trimble Connected Community ­ Management Tools y Auto ­ Synch Maintenance Planning Trimble Connected Community ­ Aggregating

193

TRUPACT-II procedures and maintenance instructions  

Science Conference Proceedings (OSTI)

The purpose of this document is to provide the technical requirements for operation, inspection and maintenance of a TRUPACT-II Shipping Package and directly related components. This document shall supply the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP (NRC Certificate of Compliance No. 9218), the TRUPACT-II SARP shall govern. This document details the operations, maintenance, repair, replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container. These procedures may be modified for site use, but as a minimum all parameters and format listed herein must be included in any site modified version. For convenience and where applicable steps may be performed out of sequence. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the minimum required procedures for use of the adjustable center of gravity lift fixture and the TRUPACT-II transport trailer in conjunction with the TRUPACT-II Packaging.

NONE

1994-01-14T23:59:59.000Z

194

Low-level waste vitrification contact maintenance viability study  

SciTech Connect

This study investigates the economic viability of contact maintenance in the Low-Level Waste Vitrification Facility, which is part of the Hanford Site Tank Waste Remediation System. This document was prepared by Flour Daniel, Inc., and transmitted to Westinghouse Hanford Company in September 1995.

Leach, C.E., Westinghouse Hanford

1996-07-12T23:59:59.000Z

195

Hanford Site Strategic Facilities Plan: Site planning  

SciTech Connect

This plan revises the Hanford Site Strategic Facilities Plan submitted by Westinghouse Hanford Company in 1988. It separates the Hanford Site facilities into two categories: ''strategically required'' facilities and ''marginal'' facilities. It provides a comparison of future facility requirements against existing capacities and proposed projects to eliminate or consolidate marginal facilities (i.e., those facilities that are not fully utilized or are no longer required to accomplish programmatic missions). The objective is to enhance the operating efficiency of the Hanford Site by maximizing facility use and minimizing unnecessary facility operating and maintenance costs. 11 refs.

1989-03-01T23:59:59.000Z

196

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections-2012  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.BackgroundAs a focus of innovative approaches and techniques, maintenance of aging steam ...

2012-12-12T23:59:59.000Z

197

Fault-Location Application for Improving Distribution System Maintenance: Hydro-Quebec's Experiences  

Science Conference Proceedings (OSTI)

Hydro-Qubec has been conducting research since 2001 in the area of distribution line predictive maintenance based on the use of power quality measurements and the localization of non-permanent faults. This concept, which forms the basis of the development of an intelligent electrical line maintenance application known as MILE (French for "Maintenance Intelligente de Lignes lectriques"), originates from a generally held idea whereby the precursor signs of distribution system equipment failure can be detec...

2011-12-23T23:59:59.000Z

198

Real-time turbine maintenance system  

Science Conference Proceedings (OSTI)

Reliable power generation and low maintenance costs are the major goals of power plant administration. This goal, in fact, can be achieved by a proper turbine maintenance policy. This study presents a model for total productive maintenance to enhance ... Keywords: Radio frequency identification, Total productive maintenance, Turbine

Tung-Liang Chen

2009-05-01T23:59:59.000Z

199

NMAC Post Maintenance Testing Guide, Revision 1  

Science Conference Proceedings (OSTI)

This Nuclear Maintenance Applications Center (NMAC) guide addresses the concern of member utilities regarding the adequacy and consistency of post-maintenance testing programs. The guide provides information on structuring, developing, organizing, and controlling a post-maintenance testing program in a power plant. It stresses the importance of advance planning to post-maintenance testing.

2004-12-08T23:59:59.000Z

200

Generator Bushing Installation and Maintenance Guide  

Science Conference Proceedings (OSTI)

This report is a comprehensive guide to generator high-voltage bushing (HVB) installation and maintenance.

2008-12-04T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

CRAD, Maintenance Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Assessment Plan Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of parts, materials, and services needed to support the

202

Optimized Maintenance of Generator Rotors  

Science Conference Proceedings (OSTI)

Generator rotor maintenance options are limited and expensive. The timing and scope of work done requires optimization to obtain the maximum benefits for continued long-term trouble-free operation. This document is a comprehensive guide to the maintenance of large generator rotors of 2 and 4 pole design that are cooled directly or indirectly by air or hydrogen. These include 50 and 60 Hz machines, operating at speeds of 1500, 1800, 3000, and 3600 RPM. The guide does not cover water-cooled rotors. The inf...

2004-12-13T23:59:59.000Z

203

Operations and Maintenance Manual for Large Aperture Scanner System  

Science Conference Proceedings (OSTI)

Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

Jones, Anthony M.; Hall, Thomas E.

2010-04-08T23:59:59.000Z

204

REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS INTERVIEW FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REQUIREMENTS BASED SURVEILLANCE AND REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS INTERVIEW FORM General Information: A. Evaluator:_______________________ Organization:___________________ Ph:_________________ B. Interviewee:_____________________ Organization:____________________ Ph:_________________ C. Activity Name :_____________________________________________________ General/Administrative Support Mission/Facility Support (Circle One) D. Safety Related: _____Yes _____No E. Procedure #: _______________________________________________________ F. Charge Number: _____________________________________________________ G. Frequency for Conducting the Activity: (Circle One) Hourly Shiftly Daily Weekly Bi-weekly Monthly Quarterly Semi-Annually Annually

205

Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant  

SciTech Connect

This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

Norm Stanley

2011-02-01T23:59:59.000Z

206

Substation battery-maintenance procedures  

SciTech Connect

The frequency of substation battery failures is gratifyingly low. One trouble spot appears to be extraneous short circuits that drain an otherwise healthy battery. Use of the lead--calcium battery promises to reduce substantially the amount of maintenance that substation batteries need.

Timmerman, M.H.

1976-05-15T23:59:59.000Z

207

B1.3 SWCX for Routine Maintenance Services-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Services- Maintenance Services- Revision 0 Sitewide Categorical Exclusion for Routine Maintenance Services Introduction As defined in the U.S. Department of Energy's (DOE) Richland Operations Office Integrated J\1anagement System Procedure, l'IEPA Analysis at Hanford, a sitewide categorical exclusion is: An application of DOE categorical exclusions described in 10 CFR 1021, Appendices A and B, which may apply to Hanford Site proposed actions (activities) that are "sitewide" in nature and extent, which the cognizant DOE Hanford NCO has determined fit within the scope (i.e., same nature and intent, and of the same or lesser scope) of DOE categorical exclusions described in 10 CFR 1021 Appendices A and B. The cognizant DOE Hanford NCO may issue specific sitewide

208

EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

42: Reauthorization of Permits, Maintenance, and Vegetation 42: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah Summary This EIS is being prepared jointly by DOE's Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western's proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska. The EIS website is http://ww2.wapa.gov/sites/western/transmission/infrastruct/Pages/Western%20FS%20EIS.aspx.

209

Operation and maintenance cost data for residential photovoltaic modules/panels  

DOE Green Energy (OSTI)

Burt Hill Kosar Rittelmann Associates has conducted a study to identify and estimate costs associated with the operation and maintenance of residential photovoltaic modules and arrays. Six basic topics related to operation and maintenance to photovoltaic arrays were investigated - General (Normal) Maintenance, Cleaning, Panel Replacement, Gasket Repair/Replacement, Wiring Repair/Replacement, and Termination Repair/Replacement. The effects of the mounting types - Rack Mount, Stand-Off Mount, Direct Mount, and Integral Mount - and the installation/replacement type - Sequential, Partial Interruption, and Independent - have been identified and described. Recommendation on methods of reducing maintenance costs are made.

None

1980-07-01T23:59:59.000Z

210

SITE SURVEILLANCE AND MAINTENANCE PROGRAM FOR PALOS PARK  

NLE Websites -- All DOE Office Websites (Extended Search)

N *ct I I rs '4) k0 In In P.1 0% 0% 03 oN I ON In kr) CO ON I ON ON .4 In CO '43 CO 0 tcl 140 co co No 43 Its %o Aft NNNNNNNN rNi IN " -13 It% 3.. N N . N 4 N. IN 4-4 C4 113...

211

General Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Environment Feature Stories Public Reading Room: Environmental Documents, Reports LANL Home Phonebook Calendar Video Business Small Business General Information General...

212

Nuclear Maintenance Applications Center: Main Feedwater Pump Maintenance Guide  

Science Conference Proceedings (OSTI)

Loss of a main feedwater pump can have severe economic impact on a nuclear utility. The majority of forced outages or power reductions are believed to be attributed to nondesign issues. Case leaks, excessive vibration, seal leaks, and lubrication system problems are shown to significantly impact feedwater pump availability. Improved maintenance practices and increased attention to these issues are critical for realizing longevity of main feedwater ...

2012-11-14T23:59:59.000Z

213

Nuclear Maintenance Applications Center: Maintenance Work Package Planning Guidance  

Science Conference Proceedings (OSTI)

The work management process is one of the core business processes outlined within the Nuclear Energy Institute (NEI) Standard Nuclear Performance Model for operation and maintenance of nuclear power plants. The preparation of work packages is a key element of this overall process. The purpose of this report is to provide guidance to power plant personnel regarding work package quality as a supplement to Institute of Nuclear Power Operations (INPO) AP-928, Work Management Process Description. The ...

2013-09-10T23:59:59.000Z

214

general_atomics.cdr  

Office of Legacy Management (LM)

from the U.S. Department of Energy (DOE). Discussions between DOE and General Atomics led to an agreed cost-sharing and no-fee arrangement for the decontamination and site...

215

Reliability-based maintenance evaluations and standard preventive maintenance programs  

SciTech Connect

Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the [open quotes]Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants[close quotes] prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated ([approximately]50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized.

Varno, M. (Vermont Yankee Nuclear Power Corp., Vernon, VT (United States)); McKinley, M. (Quadrex Energy Services Corp., Campbell, CA (United States))

1993-01-01T23:59:59.000Z

216

Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

33.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE 33.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES "The familiar level of this module is designed to summarize the basic information in DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities. This Order canceled DOE O 433.1A. This module is divided into three sections. Section one contains the objective, general requirements, and the responsibilities assigned to field element managers. Section two includes the requirements in attachment 2 of the Order, Maintenance Management Program Requirements for DOE Nuclear Facilities. Section three is a summary of the guidance provided in DOE G 433.1-1, Facility Maintenance Management Program Guide for Use with DOE O 433.1.The

217

SSA Fen Site  

NLE Websites -- All DOE Office Websites (Extended Search)

View an aerial photo-map of the SSA-Fen site. A general view of the Fen The flux tower at the Fen The huts at the Fen Pink flamingos, fen hens at the SSA-Fen site. Aerial...

218

Towoomba Site Image #1  

NLE Websites -- All DOE Office Websites (Extended Search)

Graphs Image TWM-1: General view of the Towoomba savanna grassland site, South Africa. (Photograph by Dr. R.J. Scholes, Forestek, CSIR, Pretoria, South Africa). Go to Site...

219

U.S. Department of Energy Office of Inspector General report on inspection of Westinghouse Savannah River Company fees for managing and operating the Savannah River Site  

Science Conference Proceedings (OSTI)

During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department`s annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth in fees over this five year period. The review disclosed that, after Fiscal Year 1989, the Department used an increasing number of fee bases in calculating Westinghouse Savannah River Company`s fixed-fee-equivalents from the maximum fee schedules within the Department of Energy Acquisition Regulation. The authors found that the Department had significantly increased the percentage of the dollar value of subcontracts being placed in Westinghouse`s fee bases for fee calculation purposes. They found that the Department had effectively increased Westinghouse`s fixed-fee-equivalents by approximately $3 million in both Fiscal Year 1993 and 1994 to, in large part, fund an unallowable employee incentive compensation program. They found that Westinghouse`s total paid fees for the five year period increased significantly over what they would have been had the terms resulting from the original competitive negotiations been maintained. The authors recommended that the Deputy Assist Secretary for Procurement and Assistance Management require that changes in either the number or composition of fee bases used in calculating fees from the maximum fee schedules be submitted to the Department`s Procurement Executive for approval.

NONE

1995-08-03T23:59:59.000Z

220

Calabozo Site Image #1  

NLE Websites -- All DOE Office Websites (Extended Search)

CLB-1: General view of the Trachypogon savanna at the Calabozo grassland site, Venezuela. (Trees include Curatella americana, Bowdichia virgilioides and Byrsonima crassifolia....

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Computerized Maintenance Management Systems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations & Maintenance » Computerized Program Areas » Operations & Maintenance » Computerized Maintenance Management Systems Computerized Maintenance Management Systems October 7, 2013 - 9:35am Addthis Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff. Capabilities Typical CMMS functions depend on the complexity of the system chosen. Examples include: Work order generation, prioritization, and tracking by equipment and/or component. Work orders often can be sorted by equipment, date, person responding, etc. Tracking scheduled and unscheduled maintenance activities Storing technical documentation and maintenance procedures by

222

Federal Energy Management Program: Maintenance Types  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Types Maintenance Types Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the following can ensure an optimal blend of cost and life-cycle effectiveness: Reactive Maintenance: Follows a "run it until it breaks" strategy. No action or effort is taken to maintain equipment, prevent failure, or ensure life of the system - even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time or machine run time schedules. Predictive Maintenance: Strives to detect the onset of equipment degradation and address the problems as they are identified. Several predictive maintenance technologies exist.

223

Maintenance cost studies of present aircraft subsystems  

E-Print Network (OSTI)

This report describes two detailed studies of actual maintenance costs for present transport aircraft. The first part describes maintenance costs for jet transport aircraft broken down into subsystem costs according to an ...

Pearlman, Chaim Herman Shalom

1966-01-01T23:59:59.000Z

224

African Easterly Jet: Structure and Maintenance  

Science Conference Proceedings (OSTI)

This article investigates the African easterly jet (AEJ), its structure, and the forcings contributing to its maintenance, critically revisiting previous work that attributed the maintenance of the jet to soil moisture gradients over tropical ...

Man-Li C. Wu; Oreste Reale; Siegfried D. Schubert; Max J. Suarez; Randy D. Koster; Philip J. Pegion

2009-09-01T23:59:59.000Z

225

A quality assurance program for software maintenance  

Science Conference Proceedings (OSTI)

This paper presents the description of a quality assurance (QA) program applied to software maintenance projects. The QA program is a set of checks or inspections overlaid on the steps of the maintenance project. The relationship between the QA program ...

John W. Center

1982-06-01T23:59:59.000Z

226

Improving maintenance operation through transformational outsourcing  

E-Print Network (OSTI)

Outsourcing maintenance to third-party contractors has become an increasingly popular option for manufacturers to achieve tactical and/or strategic objectives. Though simple in concept, maintenance outsourcing is difficult ...

Ye, Jacqueline Ming-Shih

2007-01-01T23:59:59.000Z

227

EPRI Maintenance Excellence Matrix Revision Status  

Science Conference Proceedings (OSTI)

This report documents the progress in revising the Electric Power Research Institute EPRI 2002 Report 1004705, Maintenance Excellence Matrix Assessment Guideline for Fossil Power Plants, which provides utilities a comprehensive self-assessment guideline for improving maintenance processes.

2008-12-23T23:59:59.000Z

228

Categorical Exclusion for Maintenance Work  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Work Maintenance Work along the Electrical District 5 to Saguaro segment (41/4 to 58/5) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kV Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures (41/4-8, 4214, 43/6, 4417, 45/4,46/6,47/2,49/2,49/6,50/2,50/6,50/8,51/4, 52/3, 54/3, 5517, 56/1 57/1-3, 57/8 & 58/2-3), because the wood poles failed stability tests, cross arms are beyond

229

Predictive Maintenance Program: Development and Implementation  

Science Conference Proceedings (OSTI)

Many forces -- the economy, competition, regulatory agencies -- are pressuring utilities to reduce operating and maintenance (O&M) costs without cutting back on reliability or availability. Many utility managers are re-evaluating their maintenance strategies to meet these demands. To show utilities how to reduce maintenance costs and extend the effective operating life of equipment, EPRI has organized an annual workshop around a unique management approach -- Predictive Maintenance (PDM).

1999-06-25T23:59:59.000Z

230

Africa's Transport Infrastructure Mainstreaming Maintenance and...  

Open Energy Info (EERE)

icon Twitter icon Africa's Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary Name: Africa's Transport Infrastructure...

231

Electric Motor Predictive and Preventive Maintenance Guide  

Science Conference Proceedings (OSTI)

Electric motor failure could result in lost capacity as well as excessive repair and maintenance costs. This guide provides information on establishing an effective maintenance program to help prevent unexpected motor failures, costly downtime, and unnecessary maintenance costs. Specifically, the guide summarizes technical data relative to four basic power plant motor types and associated components.

1992-05-02T23:59:59.000Z

232

Knowledge-Projection for Tele-Maintenance  

E-Print Network (OSTI)

-to-end system fault diagnosis and repair ­ Opening up opportunities to streamline the maintenance process Demo Data Mining GUI Query & Browse Facility System Trainer · Maintenance Procedures · Session Capture Navigator Query Engine Query Processing & Knowledge Retrieval Process Engine Dynamic Maintenance Management

Tu, Yicheng

233

Electrohydraulic Control (EHC) Fluid Maintenance Guide  

Science Conference Proceedings (OSTI)

The "Electrohydraulic Control (EHC) Fluid Maintenance Guide" provides plant personnel with information on the operation, maintenance, and performance of the electrohydraulic control (EHC) system. The contents of this guide will aid plant workers in improving EHC system reliability, performance, and plant maintenance practices.

2002-12-29T23:59:59.000Z

234

Streamlined Reliability Centered Maintenance Analysis Application Update  

Science Conference Proceedings (OSTI)

A systematic evaluation of plant equipment and maintenance requirements using reliability centered maintenance (RCM) techniques can help hold down operating costs while maintaining plant availability and reliability. This report describes the application of streamlined reliability centered maintenance (streamlined RCM) methodology and software at four utilities.

2001-10-18T23:59:59.000Z

235

Operations and Maintenance Management Support | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Support Management Support Operations and Maintenance Management Support October 4, 2013 - 5:14pm Addthis Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows activities to be scheduled with the same priority as other management actions. Mission Statement Federal O&M programs should start with a mission statement. This succinct statement should outline the program's main goals, which should be aligned to the overarching goals of site management. Aligning O&M program goals with site goals allows management to understand how O&M supports the facility across the board. It is important to involve both management and facility staff during

236

Longview District Operations and Maintenance Headquarters: Environmental assessment  

Science Conference Proceedings (OSTI)

Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives.

Not Available

1992-03-01T23:59:59.000Z

237

Longview District Operations and Maintenance Headquarters : Environmental Assessment.  

Science Conference Proceedings (OSTI)

Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives.

United States. Bonneville Power Administration.

1992-03-01T23:59:59.000Z

238

Hanford Site Development Plan  

SciTech Connect

The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

1990-01-01T23:59:59.000Z

239

Robust Maintenance Policies for Markovian Systems under Model Uncertainty  

E-Print Network (OSTI)

of various pavement management maintenance actions, (MadanatOptimal maintenance decisions for pavement management,Optimal Maintenance and Repair Policies in Asset Management

Kuhn, Kenneth D.; Madanat, Samer M.

2005-01-01T23:59:59.000Z

240

Robust maintenance policies for Markovian systems under model uncertainty  

E-Print Network (OSTI)

of various pavement management maintenance actions, (MadanatOptimal maintenance decisions for pavement management,Optimal Maintenance and Repair Policies in Asset Management

Kuhn, K D; Madanat, S M

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

WSDOT highway maintenance: environmental compliance for protected terrestrial species  

E-Print Network (OSTI)

in figure 3. Maintenance Activity Best Management PracticesOlympic Region Maintenance Program on management recommen-If a maintenance activity is not exempt, Best Management

O’Brien, Tracie; Carey, Marion; Forrester, Bret

2005-01-01T23:59:59.000Z

242

Update on maintenance and service costs of commercial building ground-source heat pump systems  

Science Conference Proceedings (OSTI)

An earlier paper showed that commercial ground-source heat pump systems have significantly lower service and maintenance costs than alternative HVAC systems. This paper expands on those results by adding 13 more buildings to the original 25 sites and by comparing the results to the latest ASHRAE survey of HVAC maintenance costs. Data from the 38 sites are presented here including total (scheduled and unscheduled) maintenance costs in cents per square foot per year for base cost, in-house, and contractor-provided maintenance. Because some of the new sites had maintenance costs that were much higher than the industry norm, the resulting data are not normally distributed. Analysis (O'Hara Hines 1998) indicated that a log-normal distribution is a better fit; thus, the data are analyzed and presented here as log-normal. The log-mean annual total maintenance costs for the most recent year of the survey ranged from 6.07 cents per square foot to 8.37 cents per square foot for base cost and contractor-provided maintenance, respectively.

Cane, D.; Garnet, J.M.

2000-07-01T23:59:59.000Z

243

Building Energy Software Tools Directory: Maintenance Edge  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Edge Maintenance Edge Maintenance Edge logo Maintenance Edge is a suite of online Software as a Service (SaaS) facility management tools that gives control and management over buildings without a capital investment. Maintenance Edge enables you to combine work order, planned maintenance, work order wireless, and critical alarms with the option of adding inventory. Fully implemented, Maintenance Edge will cut labor time, increase energy efficiencies, save on capital expenditures, and save on budget and management time. Features include: easy/user-friendly work order requesting, unlimited users, seven different user roles (limits data users can see), no capital or hardware costs required, access to data anywhere anytime, easy-to-click reporting on all the data in your system,

244

Web Site Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Help » Web Site Map Help » Web Site Map Web Site Map The links listed below include all pages on the site except document topic pages. Home Privacy/Security Help Web Site Map Mailing Services Remove me from the List Contact Us About Us News and Events News Archives News/Media FAQs Internet Resources Documents DUF6 EIS Historical Context What is an EIS? Why EIS is Needed Who is Responsible? EIS Process EIS Topics EIS Alternatives EIS Schedule Public Involvement Opportunities Public Comment Form For More Info DUF6 Management and Uses Management Responsibilities DUF6 Storage How DUF6 is Stored Where DUF6 is Stored Cylinder Leakage DUF6 Storage Safety DUF6 PEIS Cylinder Surveillance and Maintenance Conversion Potential DU Uses "Business Case" for R&D on Beneficial Uses of DU Catalysts for Destruction of Air Pollutants

245

Guideline to good practices for control of maintenance activities at DOE nuclear facilities  

Science Conference Proceedings (OSTI)

The purpose of the Guideline to Good Practices for Control of Maintenance Activities at DOE Nuclear Facilities is to provide contractor maintenance organizations with information that may be used for the development and implementation of a rigorously controlled maintenance program directed at achieving high quality work performance, personnel safety, radiological protection, operating equipment/system protection, and overall site safety and reliability at DOE nuclear facilities. This document is intended to be an example guideline for the implementation of DOE Order 4330.4A, Maintenance Management Program, Chapter II, Element 7. DOE contractors should not feel obligated to adopt all parts of this guide. Rather, they should use the information contained herein as a guide for developing maintenance programs that are applicable to their facility.

Not Available

1993-03-01T23:59:59.000Z

246

TOWARDS A MAINTENANCE SEMANTIC ARCHITECTURE Mohamed Hedi Karraya  

E-Print Network (OSTI)

packages (Computerized Maintenance Management System). The daily events of maintenance were treated a complex information system for maintenance management [9]. The project aimed to develop a collaborative including the existing systems of data acquisition, control, maintenance management, diagnosis assistance

Paris-Sud XI, Université de

247

DOE - Office of Legacy Management -- Pinellas Plant General Electric...  

Office of Legacy Management (LM)

Pinellas Plant General Electric Co - FL 07 FUSRAP Considered Sites Site: Pinellas Plant General Electric Co. (FL.07) Designated Name: Alternate Name: Location: Evaluation Year:...

248

Generation Maintenance Applications Center: Combined Cycle Combustion Turbine Maintenance Guide for the Turbine Section of the Combu stion Turbine  

Science Conference Proceedings (OSTI)

Combustion turbine combined cycle (CTCC) facilities utilize various components that are unique to these types of power-generation plants and that are not typically found in a nuclear or fossil-power plant.  As such, use of the EPRI PM Basis Database (PMDB) by current owners of CTCC facilities is limited to only those components that are common to both types of power plants.  With the projected growth in the number of CTCC facilities, EPRI General Maintenance Applications Center (GenMAC) ...

2012-12-31T23:59:59.000Z

249

Generation Maintenance Applications Center: Combined Cycle Combustion Turbine Maintenance Guide for the Compressor Section of the C ombustion Turbine  

Science Conference Proceedings (OSTI)

Combustion turbine combined cycle (CTCC) facilities utilize various components that are unique to these types of power-generation plants and that are not typically found in a nuclear or fossil-power plant.  As such, use of the EPRI PM Basis Database (PMDB) by current owners of CTCC facilities is limited to only those components that are common to both types of power plants.  With the projected growth in the number of CTCC facilities, EPRI General Maintenance Applications Center (GenMAC) ...

2012-12-31T23:59:59.000Z

250

Site Environmental Report, 1993  

SciTech Connect

The Site Environmental Report (SER) is prepared annually in accordance with DOE Order 5400.1, ``General Environmental Protection Program.`` This 1993 SER provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA). For some readers, the highlights provided in the Executive Summary may provide sufficient information. Many readers, however, may wish to read more detailed descriptions of the information than those which are presented here.

Not Available

1994-06-01T23:59:59.000Z

251

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections–2013: Supplemental Addition  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.BackgroundAs a focus of innovative approaches and techniques, maintenance of aging steam ...

2013-12-17T23:59:59.000Z

252

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Operations and Maintenance Operations and Maintenance October 16, 2013 - 5:01pm Addthis Project Construction Commissioning Operations & Maintenance Operations and maintenance (O&M) programs are critical to successfully integrating renewable energy into new Federal building construction and major renovations. This overview covers the importance of O&M programs for renewable energy projects, creating a successful O&M program, and identifying the right team to carry out the program. It highlights typical renewable energy issues and recommends following the design, specifications, and recommendations from product manufacturers. Key Actions in Operations and Maintenance Make O&M a priority to protect agency investment. Include O&M input in design reviews.

253

Predictive Maintenance Technologies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Technologies Maintenance Technologies Predictive Maintenance Technologies October 28, 2013 - 10:15am Addthis Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs. Chapter 6 of the FEMP O&M Best Practices Guide (PDF 721 KB) outlines these technologies in detail. The full guide is also available (PDF 3.3 MB). Predictive maintenance technologies include: Thermography: Infrared imaging is used to generate visual images that identify variations in the infrared radiance of object surfaces. This method can be used to detect system surface wear, leaks, or failures. Lubricant and Wear Particle Analysis (a.k.a. Oil Analysis): Detailed analysis is taken to determine needed maintenance based on lubrication

254

Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3  

Science Conference Proceedings (OSTI)

The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

Leigh, Richard J.

2012-09-01T23:59:59.000Z

255

Condition-Based Maintenance Program Coordinator Guideline  

Science Conference Proceedings (OSTI)

Condition-based maintenance (CBM) is an important component of an effective plant equipment reliability (ER) program, and in support of plant activities and undertakings in this area, in 2011 EPRI and an industry Technical Advisory Group (TAG) collaborated to produce the Condition-Based Maintenance Guideline (EPRI product 1022957). That document, a revision of the earlier four-volume Predictive Maintenance Guidelines, clearly defines the CBM process and serves as a core resource on ...

2013-03-28T23:59:59.000Z

256

FACILITY MAINTENANCE MANAGEMENT QUALIFICATION STANDARD REFERENCE GUIDE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Facility Maintenance Management Qualification Standard Reference Guide NOVEMBER 2009 Table of Contents i FIGURES...................................................................................................................................... iv TABLES........................................................................................................................................ iv ACRONYMS ................................................................................................................................. v PURPOSE...................................................................................................................................... 1 SCOPE ...........................................................................................................................................

257

DSOM (Decision Support for Operations and Maintenance ...  

Summary. Operations and maintenance (O&M) can make or break a business - especially with today's rising energy costs. DSOM® (Decision Support for ...

258

Risk-averse periodic preventive maintenance optimization.  

E-Print Network (OSTI)

??We consider a class of periodic preventive maintenance (PM) optimization problems, for a single piece of equipment that deteriorates with time or use, and can… (more)

Singh, Inderjeet,1978-

2011-01-01T23:59:59.000Z

259

Operations and maintenance reports | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

from an expert Take a comprehensive approach Operations and maintenance reports ENERGY STAR Building Upgrade Manual Install renewable energy systems Save water to save energy...

260

Pacific Northwest National Laboratory Grounds Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Pacific Northwest National Laboratory (PNNL) operates an award-winning grounds maintenance program that comprises a comprehensive landscape and irrigation management program. The...

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Federal Energy Management Program: Predictive Maintenance Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance Technologies on Facebook Tweet about Federal Energy Management Program: Predictive...

262

general_atomics.cdr  

NLE Websites -- All DOE Office Websites (Extended Search)

former former General Atomics Hot Cell Facility was constructed in 1959 and operated until 1991. The site encompassed approximately 7,400 square feet of laboratory and remote operations cells. Licensed operations at the facility included receipt, handling, and shipment of radioactive materials; remote handling, examination, and storage of previously irradiated nuclear fuel materials; pilot-scale tritium extraction operations; and development, fabrication, and inspection of uranium oxide-beryllium oxide fuel materials. General Atomics performed most of the work for the federal government. The General Atomics Hot Cell Facility was located in a 60-acre complex 13 miles northwest of downtown San Diego, 1 mile inland from the Pacific Ocean, and approximately 300 feet above sea level. The General Atomics site is in the center of Torrey Mesa Science Center, a 304-acre industrial

263

ORNL Site Ofice  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ORNL Site Ofice ORNL Site Ofice P.O. Box 2008 Oak Ridge, Tennessee 37831-6269 January 28, 2013 MEMORANDUM FOR GREGORY H. WOODS GENERAL COUNSEL GC-1 FROM: SUBJECT: ��MK = MOORE, MANAGER lF �NL SITE OFFICE ANNUAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PLANNING SUMMARY FOR 2013- OAK RIDGE NATIONAL LABORATORY (ORNL) SITE OFFICE (OSO) This correspondence transmits the Annual NEPA Planning Summary for 2013 for OSO.

264

maintenance. This research is relevant to opera-tions and maintenance challenges facing aging  

E-Print Network (OSTI)

maintenance. This research is relevant to opera- tions and maintenance challenges facing aging to make equipment last longer.Economic pressures to maintain aging fleets of commercial and military

265

Maintenance manual for the Beneficial Uses Shipping System cask. Revision 1  

Science Conference Proceedings (OSTI)

This document is the Maintenance Manual for the Beneficial Uses Shipping System (BUSS) cask. These instructions address requirements for maintenance, inspection, testing, and repair, supplementing general information found in the BUSS Safety Analysis Report for Packaging (SARP), SAND 83-0698. Use of the BUSS cask is authorized by the Department of Energy (DOE) and the Nuclear Regulatory Commission (NRC) for the shipment of special form cesium chloride or strontium flouride capsules.

Bronowski, D.R.; Yoshimura, H.R.

1993-05-01T23:59:59.000Z

266

MIE 1.0 - Gas Turbine Maintenance Interval Estimator , Version 1.0  

Science Conference Proceedings (OSTI)

The EPRI Gas Turbine Maintenance Interval Estimator Version 1.0 (MIE 1.0) is a spreadsheet application that predicts the remaining hot section life of a General Electric heavy-duty gas turbine using General Electric's standard algorithms described in GER-3620K.

2007-03-29T23:59:59.000Z

267

Nuclear Maintenance Applications Center: The Flowserve and Sulzer Reactor Coolant Pump Seal Maintenance Guide  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) report Main Coolant Pump Seal Maintenance Guide (TR-100855) was published in 1993. That report provided guidance on maintenance and troubleshooting of main coolant pump seals, but it was genericthe information was relevant to both PWRs and BWRs. By providing more current information, this report replaces the EPRI report Main Coolant Pump Seal Maintenance Guide.

2011-03-28T23:59:59.000Z

268

Nuclear Maintenance Applications Center: Vertical Pump Maintenance Guide -- Update to EPRI Report 1003467  

Science Conference Proceedings (OSTI)

Results from several annual Electric Power Research Institute (EPRI) Nuclear Maintenance Applications Center (NMAC) maintenance issues surveys indicate that members are experiencing difficulties with various maintenance issues associated with vertical pumps. Some of the problems identified a need for information and assistance with pump and motor ...

2012-10-15T23:59:59.000Z

269

Generation Maintenance Application Center: Combustion Turbine Combined-Cycle Heat Recovery Steam Generator Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to assist personnel involved with the maintenance of the heat recovery steam generator at a combustion gas turbine combined cycle facility, including good maintenance practices, preventive maintenance techniques and troubleshooting guidance. BackgroundCombustion turbine combined cycle (CTCC) facilities utilize various components that can be unique to this particular type of power plant. As such, owners and ...

2013-05-15T23:59:59.000Z

270

General Engineers  

U.S. Energy Information Administration (EIA) Indexed Site

General Engineers General Engineers The U.S. Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the General Engineer, whose work is associated with analytical studies and evaluation projects pertaining to the operations of the energy industry. Responsibilities: General Engineers perform or participate in one or more of the following important functions: * Design modeling systems to represent energy markets and the physical properties of energy industries * Conceive, initiate, monitor and/or conduct planning and evaluation projects and studies of continuing and future

271

Void Fraction Instrument operation and maintenance manual  

SciTech Connect

This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

1994-09-01T23:59:59.000Z

272

Protective Relay Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

Protective relays are decision-making elements in the protection scheme for electrical power systems. A strong test and maintenance program will keep protective relays in a high state of readiness and help utilities avoid equipment damage and prolonged downtime. This guide provides recommended practices for maintenance and testing of these relays.

1993-10-02T23:59:59.000Z

273

Value-Based Operations and Maintenance Practices  

Science Conference Proceedings (OSTI)

Utilities can maximize the net corporate value of their operating and maintenance practices through a systematic approach that employs decision analysis techniques and marginal-value analysis. In a case study that confirmed the merit of the value-based approach, Duke Power Company developed and tested decision trees for specific predictive maintenance scenarios.

1995-04-14T23:59:59.000Z

274

Power Supply Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

Instrument power supplies are very reliable; however, there is limited information that ties together operating history, maintenance practices, and data associated with repairing versus replacing power supplies. Also, the issue of equipment obsolescence affects many of the considerations associated with making power supply maintenance decisions.

2001-12-21T23:59:59.000Z

275

Operation and Maintenance Guidelines for Draft Fans  

Science Conference Proceedings (OSTI)

The reliability, efficiency, and safety of draft fans in fossil fuel power plants depend on effective operating and maintenance practices. These guidelines systematically present state-of-the-art techniques that utility personnel can use in operation, maintenance, troubleshooting, inspection, and weld repair of major fan components and auxiliary systems.

1999-05-13T23:59:59.000Z

276

Cathodic Protection System Application and Maintenance Guide  

Science Conference Proceedings (OSTI)

Typically, cathodic protection system equipment includes rectifiers, anodes, anode junction boxes, reference cells (electrodes), and test stations. The scope of this guide includes addressing the maintenance and testing of the system, its components, and providing appropriate recommendations. These recommendations will provide the basis for a suitable preventive (PM) and predictive (PdM) maintenance program.

2005-12-23T23:59:59.000Z

277

Information Technology for Energy and Maintenance Management  

E-Print Network (OSTI)

We describe the design of a tenant interface for energy and maintenance systems (TIEMS) in commercial buildings. TIEMS is designed for use by occupants (tenants) of commercial buildings. Our hypothesis is that by allowing tenants access to information from the energy and maintenance systems and by giving them some control over these systems, energy and maintenance performance can be improved. We used interviews with potential users and existing energy and maintenance databases to guide the design. Results of a field trial demonstrate the utility of TIEMS. We also describe the design of a maintenance and operations recommender (MORE). MORE uses information from computerized maintenance management systems (CMMS) and energy management and control systems (EMCS) to recommend what maintenance personnel should do in response to a maintenance service request. MORE integrates text descriptions of problems with sensor information related to the problem. After work orders are closed, MORE uses the information about what was actually done to solve the problem to learn how to improve its recommendations.

Villafana, L.; Federspiel, C.

2003-01-01T23:59:59.000Z

278

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations and Maintenance Program Areas » Operations and Maintenance Operations and Maintenance October 4, 2013 - 5:07pm Addthis Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be maintained and operated correctly to reach their full potential. Well-executed operations and maintenance (O&M) programs promote energy efficiency and life cycle performance and can save Federal agencies 5% to 20% on annual energy bills without significant capital investments. Learn about: Federal Requirements: Look up O&M-related requirements that Federal agencies must meet as outlined by law and executive order Management Process: Learn about the operations and maintenance management process Commissioning: Get an overview of commissioning processes

279

Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994  

Science Conference Proceedings (OSTI)

The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL`s control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994.

Anderson, L.A. [comp.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

1995-03-01T23:59:59.000Z

280

10 MWe Solar Thermal Central Receiver Pilot Plant maintenance experience, January 1982-March 1983  

DOE Green Energy (OSTI)

This report presents a description of the maintenance experience at the 10 MWe Solar Thermal Central Receiver Pilot Plant near Barstow, California, during the period January 1982 through March 1983. The plant systems are briefly described, and statistical data on maintenance orders, labor requirements, and maintenance costs are presented. The data presented have been extracted from Southern California Edison historical maintenance records accumulated at the plant. Pilot plant systems requiring the most maintenance activity are identified so that efforts to reduce plant maintenance costs can be properly identified. The information is analyzed for the purpose of developing a data base for general use during the economic assessment, design, and staff planning of future solar central receiver plants. However, data presented here from the Pilot Plant should not be used for direct scaling of larger power production plants. The number and size of equipment items for larger plants will not scale, the designs will vary, and the Pilot Plant includes special testing and evaluation equipment which would not be necessary in plants built for the sole purpose of power production. Data taken at the Pilot Plant during the early plant startup and operational phase shows an annual maintenance cost of approximately one perent of the recurring plant capital cost. Similar costs for recent technology steam electric generating plants are estimated to range from 1.5 to 3%. The Pilot Plant maintenance cost will not appear as favorable if based on energy produced during power production due to the small plant size and equipment intensive nature of the plant. The solar-unique systems of the plant required 45% of the total plant maintenance labor and 39% of the total maintenance cost, both percentages being lower than anticipated.

Smith, J.W.

1985-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Federal Energy Management Program: Reliability-Centered Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Reliability-Centered Maintenance to someone by E-mail Share Federal Energy Management Program: Reliability-Centered Maintenance on Facebook Tweet about Federal Energy Management Program: Reliability-Centered Maintenance on Twitter Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Google Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Delicious Rank Federal Energy Management Program: Reliability-Centered Maintenance on Digg Find More places to share Federal Energy Management Program: Reliability-Centered Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems

282

Federal Energy Management Program: Operations and Maintenance Contacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Contacts to someone by E-mail Contacts to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Contacts on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Contacts on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Google Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Delicious Rank Federal Energy Management Program: Operations and Maintenance Contacts on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Contacts on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types

283

Nuclear Maintenance Applications Center: Compression Fitting Application Manual  

Science Conference Proceedings (OSTI)

The Nuclear Maintenance Applications Center: Compression Fitting Application Manual provides power plant maintenance personnel with current maintenance information on this type of component used in power plants, both fossil fuel and nuclear. This guide will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs for this equipment.

2008-12-22T23:59:59.000Z

284

Burner Management System Maintenance Guide for Fossil Power Plant Personnel  

Science Conference Proceedings (OSTI)

Burner Management System Maintenance Guide for Fossil Power Plant Personnel provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs associated with the burner management system.

2008-03-25T23:59:59.000Z

285

Flue Gas Desulfurization Scrubber Maintenance Guide: Gypsum Dewatering Area  

Science Conference Proceedings (OSTI)

Flue Gas Desulfurization Scrubber Maintenance Guide: Gypsum Dewatering Area provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist the plant maintenance personnel in improving the reliability and reducing the maintenance costs for this area of their scrubber system.

2009-12-08T23:59:59.000Z

286

NEWTON's General Science References  

NLE Websites -- All DOE Office Websites (Extended Search)

General Science References General Science References Do you have a great general science reference link? Please click our Ideas page. Featured Reference Links: First.gov Science and Technology First.gov Science and Technology This site, sponsered by the US Government provides reference links to topics on science, telecommunications, computers, research agencies, and news. NASA Science NASA Science NASA Science, is a website sponsered by NASA, that supplies resources for understanding our world and the world above. Topics include earth science, heliophysics, the planets, astrophysics and much more. There is also an educator page! Nobel Laueate Listings and Stories Nobel Laueate Listings and Stories See the official site for the Nobel Prize, and read biographies about all of the Nobel Laureates, and there life changing discoveries and accomplishments.

287

Standard hydrogen monitoring system-B operation and maintenance manual  

DOE Green Energy (OSTI)

The purpose of this document is to provide information for the operation and maintenance of the Standards Hydrogen Monitoring System-B (SHMS-B) used in the 200E and 200W area tank farms on the Hanford site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. The primary function of the SHMS-B is to monitor specifically for hydrogen in the waste tank vapor space which may also contain unknown quantities of other gaseous constituents.

Bender, R.M.

1995-01-25T23:59:59.000Z

288

Building & Site Services Coordination  

NLE Websites -- All DOE Office Websites (Extended Search)

FAQs FAQs Conference Center and APS Site Activity Coordination Management and/or Coordination of APS Site Work/Services Safety & Emergency Management Database Maintenance Personnel Building and Site Services Coordination "We're at the End of our Pagers" The mission of the Building & Site Services Coordination is to efficiently manage and minimize the impact of APS building and site activities and to provide optimal support to APS staff and users in all 400 buildings and areas. FAQs Conference Center and APS Site Activity Coordination Locations Reservations Setups Visits & Tours Management and/or Coordination of APS Site Work/Services Work Entry Clearances Utility Shutdowns Telephone System Rigging Stockroom Office Furniture Installation Safety & Emergency Management

289

ITTF-016 Website Development-Maintenance Log 09_0909 EOTA - Business Form  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Website Development-Maintenance Log 09_0909 6 Website Development-Maintenance Log 09_0909 EOTA - Business Form Document Title: ITTP-015 Web Site Development / Maintenance Document Number: Website Development and Maintenance log ITT Melissa Otero N/A Referenced Documents: Parent Document: ITTF-016 Rev. 11_0419 Approvers: Melissa Otero Document Owner: Ben Aragon Backup Owner: Notify of Changes: A B 08_0818 Revision History: Rev. Description of Change Intitial Release. Added headings to address to include: Performance Requirements, Statutory and Regulatory Requirements, Information from Previous Similar Designs, and Other Requirements. Added additional column to indicate "Estimated Completion Date" of WSD projects. "Design Verification Complete" and "Design Validation Complete" columns removed from log.

290

Generation Maintenance Applications Center: Maintenance Guide for Horizontal Split-Casing Closed Cooling Water Pumps in Combined-Cyc le Combustion-Turbine Plants  

Science Conference Proceedings (OSTI)

This report identifies the failure modes and general maintenance requirements for horizontal split-casing closed cooling water pumps used in utility combined-cycle combustion-turbine power plants. Information in this report was provided and reviewed by member utilities. Manufacturers’ information and Electric Power Research Institute (EPRI) database information was used as a basis for the ...

2012-11-21T23:59:59.000Z

291

Africa's Transport Infrastructure Mainstreaming Maintenance and  

Open Energy Info (EERE)

Africa's Transport Infrastructure Mainstreaming Maintenance and Africa's Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management Agency/Company /Organization: World Bank Complexity/Ease of Use: Not Available Website: www.infrastructureafrica.org/system/files/Africa%27s%20Transport%20Inf Transport Toolkit Region(s): Africa & Middle East Related Tools The BEST Experiences with Bioethanol Buses The Sourcebook on Sustainable Urban Transport Alternative Fuels and Advanced Vehicles Data Center ... further results Find Another Tool FIND TRANSPORTATION TOOLS Transport infrastructure is a key requirement for economic growth. In Africa today, networks are sparse, conditions poor, transit slow and

292

Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker  

E-Print Network (OSTI)

New maintenance techniques for circuit breakers are studied in this dissertation by proposing a probabilistic maintenance model and a new methodology to assess circuit breaker condition utilizing its control circuit data. A risk-based decision approach is proposed at system level making use of the proposed new methodology, for optimizing the maintenance schedules and allocation of resources. This dissertation is focused on developing optimal maintenance strategies for circuit breakers, both at component and system level. A probabilistic maintenance model is proposed using similar approach recently introduced for power transformers. Probabilistic models give better insight into the interplay among monitoring techniques, failure modes and maintenance techniques of the component. The model is based on the concept of representing the component life time by several deterioration stages. Inspection and maintenance is introduced at each stage and model parameters are defined. A sensitivity analysis is carried to understand the importance of model parameters in obtaining optimal maintenance strategies. The analysis covers the effect of inspection rate calculated for each stage and its impact on failure probability, inspection cost, maintenance cost and failure cost. This maintenance model is best suited for long-term maintenance planning. All simulations are carried in MATLAB and how the analysis results may be used to achieve optimal maintenance schedules is discussed. A new methodology is proposed to convert data from the control circuit of a breaker into condition of the breaker by defining several performance indices for breaker assemblies. Control circuit signal timings are extracted and a probability distribution is fitted to each timing parameter. Performance indices for various assemblies such as, trip coil, close coil, auxiliary contacts etc. are defined based on the probability distributions. These indices are updated using Bayesian approach as the new data arrives. This process can be made practical by approximating the Bayesian approach calculating the indices on-line. The quantification of maintenance is achieved by computing the indices after a maintenance action and comparing with those of previously estimated ones. A risk-based decision approach to maintenance planning is proposed based on the new methodology developed for maintenance quantification. A list of events is identified for the test system under consideration, and event probability, event consequence, and hence the risk associated with each event is computed. Optimal maintenance decisions are taken based on the computed risk levels for each event. Two case studies are presented to evaluate the performance of the proposed new methodology for maintenance quantification. The risk-based decision approach is tested on IEEE Reliability Test System. All simulations are carried in MATLAB and the discussions of results are provided.

Natti, Satish

2008-12-01T23:59:59.000Z

293

Hydramotor (R) Actuator Application and Maintenance Guide: ASCO NH90 Series Hydramotors (R) for Nuclear Applications  

Science Conference Proceedings (OSTI)

Hydramotors(R), electro-hydraulic actuators manufactured by ASCO General Controls (formerly ITT Barton and ITT General Controls), are widely used in nuclear power plant systems. Many provide critical safety functions such as valve and damper operation. While Hydramotors(R) are generally very reliable, regular maintenance and overhaul is important. Improving the reliability of Hydramotor(R) actuators has become an industry focus because of the implementation of the Nuclear Regulatory Commission's Maintena...

2000-02-15T23:59:59.000Z

294

Development of computer-aided maintenance resources planning (CAMRP): A case of multiple CNC machining centers  

Science Conference Proceedings (OSTI)

Total productive maintenance (TPM), total maintenance assurance, preventive maintenance, reliability-centered maintenance (RCM), and many other innovative approaches to maintenance problems all aim at enhancing the effectiveness of machines to ultimately ... Keywords: Maintenance, Resources planning, Theory of constraints

J. Ashayeri

2007-12-01T23:59:59.000Z

295

Maintenance scheduling for modular systems-models and algorithms  

E-Print Network (OSTI)

Maintenance scheduling is an integral part of many complex systems. For instance, without effective maintenance scheduling, the combined effects of preventative and corrective maintenance can have severe impacts on the ...

Zarybnisky, Eric J. (Eric Jack), 1979-

2011-01-01T23:59:59.000Z

296

FINAL REPORT: PHASE FOUR HIGHWAY MAINTENANCE CONCEPT VEHICLE  

E-Print Network (OSTI)

the maintenance management system. Phase IV has two major strands, technical and financial. The outcome of Phase ................................................................................................................. 55 AMS-200 (Application Management System) Console innovation in highway maintenance management, maintenance operations practices, and research. CTRE provided

Beresnev, Igor

297

Information Management, Analytics & Optimization Services IMS System Maintenance Service Offering  

E-Print Network (OSTI)

Information Management, Analytics & Optimization Services IMS System Maintenance Service Offering The IMS System Maintenance Review offering is a special service offering from the IMS laboratory Technical Specialist group. Complex IMS systems require periodic maintenance, coupled with a specific testing process

298

Pulverizer Maintenance Guide, Volume 2: Babcock & Wilcox Roll Wheel Pulverizers  

Science Conference Proceedings (OSTI)

The "Pulverizer Maintenance Guide, Volume 2: B&W Roll Wheel™ Pulverizers" provides fossil plant personnel with current maintenance information on this specific mill design. This guide will assist a plant in improving the maintenance of their pulverizer mills.

2004-12-22T23:59:59.000Z

299

Legacy Management FUSRAP Sites | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Legacy Management FUSRAP Sites Legacy Management FUSRAP Sites Legacy Management FUSRAP Sites Legacy Management FUSRAP Sites Long-Term Surveillance and Maintenance (LTS&M) of Remediated FUSRAP Sites The DOE Office of Legacy Management (LM) established LTS&M requirements for remediated FUSRAP sites. DOE evaluates the final site conditions of a remediated site on the basis of risk for different future uses. DOE then confirms that LTS&M requirements will maintain protectiveness. Most Formerly Utilized Sites Remedial Action Program (FUSRAP) sites are remediated to conditions that pose no risk to human health and the environment under any future use scenario. With regulator concurrence, these sites are released for unrestricted use. No ongoing surveillance is required and LM responsibilities consist of preserving site records and

300

Human Factors/Ergonomics Handbook for the Design for the Ease of Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

113 3.0 WORKSPACE, STORAGE, AND WORKSHOP DESIGN 3.1 Workspace and operations in non-workshop areas 3.1.1 Workspace 3.1.1.1 General Maintenance clearance. To provide adequate clearance for maintainers and to provide sufficient space to accommodate tools, test equipment, procedures, and other job aids during an in-place repair, a nominal 914 mm (36 in.) maintenance clearance should be provided around all major system components and piping of 610 mm (24 in.) diameter and larger. 3.1.1.1 Console floor space. Whenever feasible, free floor space of at least 1.22 m (48 in.) should be provided in front of consoles used by maintenance personnel. For equipment racks that require maintenance, free floor space should be provided in accordance with the criteria given below.

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Aging Power Cable Maintenance Guideline  

Science Conference Proceedings (OSTI)

Medium-voltage cables (5- to 35-kV rated cables) have provided reasonable service in power plants. However, there is a concern that cables that have experienced long periods of wet service might degrade and fail in service. Because most plants have had few problems with medium-voltage cables, little on-staff experience with medium-voltage cables exists at most sites. This report provides information that will be of practical use when questions concerning medium-voltage cable longevity in adverse ...

2012-11-16T23:59:59.000Z

302

Implementing lean methodologies within a maintenance organization  

E-Print Network (OSTI)

The primary goal of the project was to make the machine maintenance process more efficient. In order to do this, we conducted a 3-day Value Stream Mapping workshop, during which we generated a map of the present value ...

Levine, Dana Ari

2009-01-01T23:59:59.000Z

303

Improve Operations & Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improve Operations & Maintenance Improve Operations & Maintenance Improve Operations & Maintenance Photo of an equipment room in a high-rise commercial office building with red and green equipment. Every building's energy consumption can benefit from rigorous operations and maintenance (O&M) practices. Properly planned and executed O&M is one of the most cost-effective strategies for ensuring equipment longevity, reliability, safety, and energy efficiency in commercial buildings. By one estimate, O&M measures cost about 20 times less and achieve roughly the same energy savings as energy efficiency upgrades. There are various opportunities to improve efficiency through O&M that can be discovered through efforts such as engaging tenants, training building staff, and

304

Infrared Thermometry in Winter Road Maintenance  

Science Conference Proceedings (OSTI)

There is significant interest among road authorities in measuring pavement conditions to perform appropriate winter road maintenance. The most common monitoring methods are based on pavement-mounted sensors. This study’s hypothesis is that the ...

Patrik Jonsson; Mats Riehm

2012-06-01T23:59:59.000Z

305

Steam Turbine Hydraulic Control system Maintenance Guide  

Science Conference Proceedings (OSTI)

Steam turbine hydraulic control system maintenance problems have been a significant factor in plant power reductions, shutdowns, and lost generation. This guide provides recommendations to improve the reliability of the hydraulic components and fluid.

1996-12-31T23:59:59.000Z

306

Low-Maintenance Wind Power System  

E-Print Network (OSTI)

with widespread adoption of wind energy. The project hasProject: Low-Maintenance Wind Power System Summary of theImproved Vertical Axis Wind Turbine and Aerodynamic Control

Rasson, Joseph E

2010-01-01T23:59:59.000Z

307

Optimization Online - Optimizing Preventive Maintenance Models  

E-Print Network (OSTI)

Jun 29, 2004 ... Optimizing Preventive Maintenance Models ... It is assumed that there is a known model which predicts the frequency of system failure as a function of ... Category 2: Applications -- OR and Management Sciences (Scheduling ).

308

An object oriented testing and maintenance environment  

Science Conference Proceedings (OSTI)

The object-oriented (OO) paradigm enjoys increasing acceptance in the software industry. Although the OO paradigm has visible benefits in the development cycle, testing and maintenance of OO programs have been considered challenging tasks by the research ...

David C. Kung; Jerry Gao; Pei Hsia

1994-10-01T23:59:59.000Z

309

Sound maintenance practices protect fan investments  

Science Conference Proceedings (OSTI)

Since underground coal miners depend on axial fans, lack of maintenance could prove costly. A number of pre-emptive actions that can help keep fans running at optimal performance can also be taken. 2 photos.

Bauer, M.

2009-11-15T23:59:59.000Z

310

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Management Effective management is critical to any operations and maintenance (O&M) program. The management function should bind the distinct parts of the O&M program into...

311

Fossil Maintenance Basis Optimization: Challenges and Strategies  

Science Conference Proceedings (OSTI)

This report covers many of the process challenges and strategies that were encountered and deployed during the implementation and execution of a preventive maintenance basis optimization (MBO) process at fossil generating stations. This MBO process was executed by several Electric Power Research Institutemember (EPRI-member) companies on a fleetwide basis as part of the members' plant reliability optimization (PRO) efforts. The PRO process covers many of the preventive maintenance (PM) programs at multip...

2010-05-27T23:59:59.000Z

312

Solar Photovoltaic System Operations and Maintenance  

Science Conference Proceedings (OSTI)

Grid-connected flat plate solar photovoltaic (PV) systems are being deployed at an accelerating rate worldwide. Representing a growing absolute share of both independent power producer (IPP) and utility generation portfolios, these PV assets are now commanding a greater level of attention to ensure their optimal availability and performance. Contrary to popular belief, PV power plants are not maintenance free; in fact, they require a steady diet of scheduled preventive maintenance and unscheduled service...

2011-12-22T23:59:59.000Z

313

Advanced Electric Motor Predictive Maintenance Project  

Science Conference Proceedings (OSTI)

EPRI sponsored the three-year Advanced Electric Motor Predictive Maintenance (AEMPM) project in 2000 to increase the effectiveness of motor maintenance at a time when utilities were in a state of declining motor knowledge due to downsizing and restructuring. The project identified areas for improvement that were common to most utilities and selected appropriate measures to address these concerns. Areas addressed include documenting motor knowledge, increasing utility confidence in newer technologies and ...

2003-05-28T23:59:59.000Z

314

Performance Focused Maintenance for Distribution Substations  

Science Conference Proceedings (OSTI)

Performance Focused Maintenance (PFM) was introduced in 2005 as a generic concept to help maintenance managers cope with the competing objectives of maintaining service standards while containing costs. This report further develops the principles of PFM and integrates them into the larger power delivery asset management process. As the name implies, PFM focuses on performance and this report develops and demonstrates the steps required to establish proper performance measures and KPIs for PFM implementat...

2006-12-19T23:59:59.000Z

315

Capital and Maintenance Projects for Efficiency Improvements  

Science Conference Proceedings (OSTI)

This Electric Power Research Institute (EPRI) project developed a methodology to assess the costs and benefits of potential maintenance improvements to coal-fired power plants, refined the methodology developed in 2008 to assess the net annual benefit of potential capital improvements to these plants, and applied the methodologies to a hypothetical plant. The calculations are captured in two spreadsheets8212one for capital projects and the other for maintenance projects8212that are included in the report...

2009-10-13T23:59:59.000Z

316

Small Wind Guidebook/Where Can I Find Installation and Maintenance Support  

Open Energy Info (EERE)

Where Can I Find Installation and Maintenance Support Where Can I Find Installation and Maintenance Support < Small Wind Guidebook Jump to: navigation, search Print PDF WIND ENERGY STAKEHOLDER ENGAGEMENT & OUTREACHSmall Wind Guidebook Home WindTurbine-icon.png Small Wind Guidebook * Introduction * First, How Can I Make My Home More Energy Efficient? * Is Wind Energy Practical for Me? * What Size Wind Turbine Do I Need? * What Are the Basic Parts of a Small Wind Electric System? * What Do Wind Systems Cost? * Where Can I Find Installation and Maintenance Support? * How Much Energy Will My System Generate? * Is There Enough Wind on My Site? * How Do I Choose the Best Site for My Wind Turbine? * Can I Connect My System to the Utility Grid? * Can I Go Off-Grid? * State Information Portal * Glossary of Terms * For More Information

317

Federal Energy Management Program: Resources on Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Resources on Resources on Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Resources on Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Resources on Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Google Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Delicious Rank Federal Energy Management Program: Resources on Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Resources on Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning

318

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance Program Structure to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Structure on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Structure on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Structure on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Structure on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements

319

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance Program Implementation to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Implementation on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Implementation on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Implementation on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Implementation on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

320

Joint Maintenance Status Report of Potomac Electric Power Company...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Requirements-Based Surveillance and Maintenance Review Guide...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Maintenance Review Guide Appendix A - Requirements-Based Surveillance and Maintenance Review Implementation Process, Process Flow Chart and the Flow Chart Footnotes...

322

Attention to maintenance is key to longer battery life  

SciTech Connect

A unique way for battery maintenance on electric truck is described. This system is involved in multi-shift operation entailing battery changing, charging, and programed maintenance.

1975-08-01T23:59:59.000Z

323

general_atomics.cdr  

Office of Legacy Management (LM)

former General former General Atomics Hot Cell Facility was constructed in 1959 and operated until 1991. The site encompassed approximately 7,400 square feet of laboratory and remote operations cells. Licensed operations at the facility included receipt, handling, and shipment of radioactive materials; remote handling, examination, and storage of previously irradiated nuclear fuel materials; pilot-scale tritium extraction operations; and development, fabrication, and inspection of uranium oxide-beryllium oxide fuel materials. General Atomics performed most of the work for the federal government. The General Atomics Hot Cell Facility was located in a 60-acre complex 13 miles northwest of downtown San Diego, 1 mile inland from the Pacific Ocean, and approximately 300 feet above sea level.

324

General Information  

NLE Websites -- All DOE Office Websites (Extended Search)

ASD General Information ASD General Information APS Resources & Information A list of useful links for APS staff and users. APS Technical Publications Links to APS technical publications. APS Publications Database The official and comprehensive source of references for APS-related journal articles, conference papers, book chapters, dissertations, abstracts, awards, invited talks, etc. Image Library A collection of APS images. Responsibilities & Interfaces for APS Technical Systems Descriptions of the responsibilities of APS technical groups and how they interface with one another. APS Procedures Operational procedures for the APS. APS Specifications Specifications and approvals for upgrades or changes to existing APS hardware and software. APS Radiation Safety Policy & Procedures Committee Minutes

325

An overview of time-based and condition-based maintenance in industrial application  

Science Conference Proceedings (OSTI)

This paper presents an overview of two maintenance techniques widely discussed in the literature: time-based maintenance (TBM) and condition-based maintenance (CBM). The paper discusses how the TBM and CBM techniques work toward maintenance decision ... Keywords: Condition-based maintenance, Industrial application, Maintenance decision making, Maintenance techniques, Preventive maintenance, Time-based maintenance

Rosmaini Ahmad; Shahrul Kamaruddin

2012-08-01T23:59:59.000Z

326

Nuclear Maintenance Applications Center: Generator Maintenance Guide for Emergency Diesel Generators (Japanese Version)  

Science Conference Proceedings (OSTI)

This report is a Japanese translation of Electric Power Research Institute (EPRI) Technical Report 1021479. EPRI developed this report to address maintenance and improve long-term reliability and availability of generators within nuclear power plant emergency diesel generator (EDG) systems. Maintenance of generator stators and rotors is the focus of this report, which highlights maintenance tasks and strategies that can be performed to identify generator degradation and prevent unforeseen failures. This ...

2012-03-21T23:59:59.000Z

327

Nuclear Maintenance Applications Center: Maintenance Engineering Fundamentals for Nuclear Utility Personnel - Student Handbook  

Science Conference Proceedings (OSTI)

This EPRI report is the student handbook for participants in a training course on maintenance engineering fundamentals for nuclear utility personnel. The training course was developed in conjunction with EPRI report 1015307, Nuclear Maintenance Applications Center: Maintenance Engineer Fundamentals Handbook. Among the materials in the student handbook are an overview of the entire course; lists of pertinent definitions, acronyms, and resource materials; summaries of learning objectives and key points for...

2008-12-22T23:59:59.000Z

328

Generation Maintenance Application Center: Fuel Gas System for Combustion Turbine Combined Cycle Plant Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to assist personnel involved with the maintenance of the fuel gas system at a gas turbine combined cycle facility, including good maintenance practices, preventive maintenance techniques and troubleshooting guidance. BackgroundCombustion turbine combined cycle (CTCC) facilities utilize various components that can be unique to this particular type of power plant. As such, owners and operators of CTCC facilities may find ...

2013-05-15T23:59:59.000Z

329

Microsoft Word - FINAL Contact Record 2012-01 Roads Maintenance  

Office of Legacy Management (LM)

RFLMA Contact Record 2012-01 page 1 of 6 RFLMA Contact Record 2012-01 page 1 of 6 ROCKY FLATS SITE REGULATORY CONTACT RECORD Purpose: Soil Disturbance Review Plan-Roads maintenance, including grading the road to the former A-3 Pond to convert the road to two-track vehicle use. Contact Record Approval Date: May 31, 2012 Site Contact(s)/Affiliation(s): Scott Surovchak, U.S. Department of Energy (DOE); Gwen Hooton, DOE; Rick DiSalvo, S.M. Stoller Corporation (Stoller); Kurt Franzen, Stoller; Linda Kaiser, Stoller Regulatory Contact(s)/Affiliation(s): Carl Spreng, Colorado Department of Public Health and Environment (CDPHE); Vera Moritz, U.S. Environmental Protection Agency (EPA) Date of Consultation Meeting: May 24, 2012 Consultation Meeting Participants: Carl Spreng, CDPHE; Scott Surovchak, DOE;

330

Princeton Site Ofice  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Princeton Site Ofice Princeton Site Ofice P.O. Box 102 Princeton, New Jersey 08542-0102 TO: Gregory H. Woods, General Counsel JA N Z Q= LMN N= SUBJECT: PRINCETON SITE OFFICE (PSO) 2013 ANNUAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PLANNING SUMMARY Section 5(a)(7) of DOE Order 451.1B Change 3, NEPA Compliance Program, requires each Secretarial Oficer and Head of Field Organization to submit an Annual NEPA Planning Summary to the General Coun. s el. We have reviewed

331

Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Maintenance to Vehicle Maintenance to Conserve Fuel to someone by E-mail Share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Facebook Tweet about Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Twitter Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Google Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Delicious Rank Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Digg Find More places to share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on AddThis.com... More in this section... Idle Reduction Parts & Equipment Maintenance Driving Behavior Fleet Rightsizing System Efficiency Vehicle Maintenance to Conserve Fuel A comprehensive vehicle maintenance strategy can help fleet managers and

332

INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY2006  

SciTech Connect

This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during Fiscal Year 2006. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document.

B. E. Olaveson

2006-10-02T23:59:59.000Z

333

Pantex Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Pantex Site Pantex Site The primary mission of the Pantex Plant is the assembly, disassembly, testing, and evaluation of nuclear wespons in support of the NNSA stockpile...

334

Site Operator Program  

DOE Green Energy (OSTI)

Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

Warren, J.F.

1991-12-31T23:59:59.000Z

335

Site Operator Program  

DOE Green Energy (OSTI)

Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

Warren, J.F.

1991-01-01T23:59:59.000Z

336

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 O&M Ideas for Major Equipment Types 9 O&M Ideas for Major Equipment Types 9.1 Introduction At the heart of all O&M lies the equipment. Across the Federal sector, this equipment varies greatly in age, size, type, model, fuel used, condition, etc. While it is well beyond the scope of this guide to study all equipment types, we tried to focus our efforts on the more common types prevalent in the Federal sector. The objectives of this chapter are the following: * Present general equipment descriptions and operating principles for the major equipment types. * Discuss the key maintenance components of that equipment. * Highlight important safety issues. * Point out cost and energy efficiency issues. * Highlight any water-related efficiency impacts issues. * Provide recommended general O&M activities in the form of checklists.

337

Siting Handbook WIND ENERGY SITING HANDBOOK  

E-Print Network (OSTI)

This Wind Energy Siting Handbook (the "Handbook") presents general information about regulatory and environmental issues associated with the development and siting of wind energy projects in the United States. It is intended to be a general guidance document providing technical information and tools for identifying potential issues that may arise with wind energy projects. The Handbook contains links to resources on the Internet. Those links are provided solely as aids to assist you in locating other Internet resources that may be of interest. They are not intended to state or imply that AWEA or the Contributors endorse, approve, sponsor, or are affiliated or associated with those linked sites. The Handbook is not intended as a comprehensive discussion of all wind energy project issues and should be used in conjunction with other available resources. The Handbook also is not intended as legal or environmental advice or as a best practices manual, nor should it be considered as such. Because the Handbook is only a general guidance document, independent legal counsel and/or environmental consulting services should be obtained to further explore any wind energy siting issue, matter, or project. In reviewing all or any part of the Handbook, you acknowledge and understand that the Handbook is only a general guidance document and does not constitute a best practices manual, legal or environmental advice, or a legal or other relationship with the American Wind Energy Association ("AWEA") or any of the persons or entities

unknown authors

2008-01-01T23:59:59.000Z

338

Comparing maintenance costs of geothermal heat pump systems with other HVAC systems: Preventive maintenance actions and total maintenance costs  

SciTech Connect

Total annual heating, ventilating, and air-conditioning (HVAC) maintenance costs were determined for 20 schools in the Lincoln, Nebraska, Public School District. Each school examined provides cooling to over 70% of its total floor area and relies on one of the following heating and cooling systems to provide the majority of space conditioning: vertical-bore, geothermal heat pumps (GHPs), air-cooled chiller with gas-fired hot water boiler (ACC/GHWB), or water-cooled chiller with gas-fired steam boiler (WCC/GSB). A precursor to this study examined annual costs associated with repair, service, and corrective maintenance activities tracked in a work order database. This follow-up study examines costs associated with preventive maintenance (PM) activities conducted by the district. Annual PM costs were 5.87 {cents}/yr-ft{sup 2} (63.14 {cents}/yr-m{sup 2}) for ACC/GHWB schools, followed by 7.14 {cents}/yr-ft{sup 2} (76.86 {cents}/yr-m{sup 2}) for GHP, 9.82 {cents}/yr-ft{sup 2} (105.39 {cents}/yr-m{sup 2}) for WCC/ GSB, and 12.65 {cents}/yr-ft{sup 2} (136.30 {cents}/yr-m{sup 2}) for WCC/GHWB. The results of the two analyses are combined to produce an estimate of total annual maintenance costs, by system type, for the 20 schools. Total annual maintenance costs were 8.75 {cents}/yr-ft{sup 2} (94.20 {cents}/yr-m{sup 2}) for ACC/GHWB schools, followed by 9.27 {cents}/yr-ft{sup 2} (99.76 {cents}/yr-m{sup 2}) for GHP, 13.54 {cents}/yr-ft{sup 2} (145.49 {cents}/yr-m{sup 2}) for WCC/GSB, and 18.71 {cents}/yr-ft{sup 2} (201.61 {cents}/yr-m{sup 2}) for WCC/GHWB. It should be noted that these costs represent only the trends seen in the maintenance database of the Lincoln School District. Because of differences in the number of schools using each system type, varying equipment age, and the small total number of schools included in the study, the maintenance costs presented here may not be representative of the maintenance costs seen for similar equipment in other locations.

Martin, M.A.; Madgett, M.G.; Hughes, P.J.

2000-07-01T23:59:59.000Z

339

Eng. Opt., 2002, Vol. 34, pp. 561577 DESIGNING FOR MAINTENANCE  

E-Print Network (OSTI)

of a series of absorption chillers for an industrial complex. Keywords: Maintenance; Game theory; Decision

Seepersad, Carolyn Conner

340

Flue Gas Desulfurization Scrubber Maintenance Guide: Absorber Area  

Science Conference Proceedings (OSTI)

The Flue Gas Desulfurization Scrubber Maintenance Guide: Absorber Area provides fossil plant maintenance personnel with current maintenance information on this system and will help to improve the reliability of and reduce the maintenance costs for this area of their scrubber system.

2008-12-18T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Fundamental Laws and Assumptions of Software Maintenance Adam A. Porter  

E-Print Network (OSTI)

environments. The longer a system stays in service, the larger maintenance costs are, and, therefore, it­oriented programming languages, software architectures and configuration management. Managing the maintenance process. Maintenance is costly and somewhat unpredictable. Thus, management tools for controlling maintenance

Porter, Adam

342

Flue Gas Desulfurization Scrubber Maintenance Guide: Reagent Preparation Area  

Science Conference Proceedings (OSTI)

The Flue Gas Desulfurization Scrubber Maintenance Guide: Reagent Preparation Area provides the fossil plant maintenance personnel with current maintenance information on this system and will help improve the reliability and reduce the maintenance costs for this area of their scrubber system.

2008-12-15T23:59:59.000Z

343

A condition-based maintenance policy for intelligent monitored system  

Science Conference Proceedings (OSTI)

This study proposes a sequential Condition-Based Maintenance (CBM) policy for intelligent monitored system based on cost and reliability prioritisation. It is assumed that system's reliability could be continuously monitored, whenever ... Keywords: CBM, condition-based maintenance, cost, intelligent monitoring, maintenance policy, optimisation, predictive maintenance, reliability, simulation

Wenzhu Liao; Ershun Pan; Lifeng Xi

2009-06-01T23:59:59.000Z

344

CleanFleet. Final report: Volume 3, vehicle maintenance and durability  

DOE Green Energy (OSTI)

CleanFleet is a demonstration of panel vans operating on five alternative motorfuels in commercial package delivery operations in the South Coast Air Basin of California. The five alternative fuels are propane gas, compressed natural gas (CNG), California Phase 2 reformulated gasoline (RFG), methanol (M-85 with 15 percent RFG), and electricity. Data were gathered on in-use emissions, operations, and fleet economics. This volume of the final report summarizes the maintenance required on these vans from the time they were introduced into the demonstration (April through early November 1992) until the end of the demonstration in September 1994. The vans were used successfully in FedEx operations; but, to varying degrees, the alternative fuel vehicles required more maintenance than the unleaded gasoline control vehicles. The maintenance required was generally associated with the development state of the fuel-related systems. During the demonstration, no non-preventive maintenance was required on the highly developed fuel-related systems in any of the unleaded gasoline production vehicles used either as controls or as RFG test vehicles. The maintenance problems encountered with the less developed systems used in this demonstration may persist in the short term with vehicles featuring the same or similar systems. This means that fleet operators planning near-term acquisitions of vehicles incorporating such systems should consider the potential for similar problems when (1) selecting vendors and warranty provisions and (2) planning maintenance programs.

NONE

1995-12-01T23:59:59.000Z

345

Federal Energy Management Program: Operations and Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Support to someone by E-mail Management Support to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Management Support on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Management Support on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Google Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Delicious Rank Federal Energy Management Program: Operations and Maintenance Management Support on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Management Support on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

346

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Measurement to someone by E-mail Measurement to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Measurement on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Measurement on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Measurement on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Measurement on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

347

Inspector General  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of the Under Secretary for Nuclear Security Edward B. Held (Acting) Under Secretary for Nuclear Security DEPARTMENT OF ENERGY Office of the Under Secretary for Management & Performance Vacant Under Secretary for Management and Performance Office of the Under Secretary for Science & Energy Vacant Under Secretary for Science and Energy Southwestern Power Administration Bonneville Power Administration Western Area Power Administration Southeastern Power Administration U.S. Energy Information Administration Loan Programs Office Advanced Research Projects Agency - Energy General Counsel Assistant Secretary for Congressional & Intergovernmental Affairs Chief Human Capital Officer

348

1994 Site environmental report  

Science Conference Proceedings (OSTI)

The Fernald site is a Department of Energy (DOE)-owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the site in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. The Site Environmental Report (SER) is prepared annually in accordance with DOE Order 5400.1, General Environmental Protection Program. This 1994 SER provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, U.S. Environmental Protection Agency (USEPA), and Ohio EPA (OEPA). For some readers, the highlights provided in this Executive Summary may provide sufficient information. Many readers, however, may wish to read more detailed descriptions of the information than those which are presented here. All information presented in this summary is discussed more fully in the main body of this report.

NONE

1995-07-01T23:59:59.000Z

349

POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POST-DEACTIVATION SURVEILLANCE AND POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING Post-Deactivation Surveillance and Maintenance Planning Dependence of End-Points Planning on S&M Planning Primary Surveillance Concerns Typical Deactivation S&M Plan Contents Example of a Post-Deactivation S&M Plan Dependence of End-Points Planning on S&M Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is

350

software maintenance in Distributed, EVOLVing Environments  

E-Print Network (OSTI)

Distributed applications in evolving environments are typically difficult to maintain. Currently, human intervention is needed to maintain the application and adapt it to its changed environment. We need to: deploy application software on the added devices (buses), replace application software on the changed devices (e.g. to support the new advertisement display), and remove application software when no longer useful (e.g. because it requires an advertisement display which is removed). When the distributed environment becomes too large, or changes too often, manual software maintenance is no longer a feasible option. Automation is required. This paper reports on our ongoing work on dEVOLVe, a new OSGi based middleware platform which will automate some software maintenance tasks in ’distributed evolving environments’. dEVOLVe will detect changes in the distributed environment and will adapt the application accordingly. This way, the user is free from software maintenance tasks caused by the environment evolution.

Bart Elen; Sam Michiels; Wouter Joosen; Pierre Verbaeten; Bart Elen; Sam Michiels; Wouter Joosen; Pierre Verbaeten

2008-01-01T23:59:59.000Z

351

General Employee Radiological Training  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Not Measurement Not Measurement Sensitive DOE-HDBK-1131-2007 December 2007_______ Change Notice 1 Reaffirmed 2013 DOE HANDBOOK GENERAL EMPLOYEE RADIOLOGICAL TRAINING U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ Change 1 DOE-HDBK-1131-2007 Original Change Part 2 page 5 The average annual radiation dose to a member of the general population is about 360 millirem/year. The average annual radiation dose to a member of the general population is about 620 millirem/year. Part 2 page 5 Natural background radiation is by far the

352

General Employee Radiological Training  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

_______ _______ Change Notice 1 June 2009 DOE HANDBOOK GENERAL EMPLOYEE RADIOLOGICAL TRAINING U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Not Measurement Sensitive This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ Change 1 DOE-HDBK-1131-2007 Original Change Part 2 page 5 The average annual radiation dose to a member of the general population is about 360 millirem/year. The average annual radiation dose to a member of the general population is about 620 millirem/year. Part 2 page 5 Natural background radiation is by far the

353

Geothermal: Sponsored by OSTI -- Generalized displacement correlation...  

Office of Scientific and Technical Information (OSTI)

Generalized displacement correlation method for estimating stress intensity factors Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us | Admin Log On Home...

354

Valve Application, Maintenance, and Repair Guide  

Science Conference Proceedings (OSTI)

The Valve Application, Maintenance, and Repair Guide is a two-volume series that provides a generic overview of valve application, selection, maintenance, and repair. Volume 1 of the series is a comprehensive reference on the application and use of valves that provides guidance on the selection of specific types of valves on the basis of functional and system requirements. This document is based on an earlier EPRI document (NP-6516, Guide for the Application and Use of Valves in Power Plant Systems). Ext...

1999-05-07T23:59:59.000Z

355

ATLAS Maintenance and Operation management system  

E-Print Network (OSTI)

The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

Copy, B

2007-01-01T23:59:59.000Z

356

DOE - Office of Legacy Management -- General Motors Co - Flint...  

Office of Legacy Management (LM)

Motors Co - Flint - MI 07 FUSRAP Considered Sites Site: GENERAL MOTORS CO. (MI.07 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate...

357

General Category  

NLE Websites -- All DOE Office Websites (Extended Search)

Sunrise and Sunset Visual Differences Sunrise and Sunset Visual Differences Name: Joey Status: other Grade: other Country: Canada Date: Spring 2012 Question: It seems that sunrise and sunset don't look symmetric. I mean that sunsets tend to have much redder skies and sunrise is usually a bit gloomier. If you see a picture, many times you can tell if its sunrise or sunset, even though I would think they should like identical, except that the sun is either going up or going down. Why do they not appear the same but in reverse? Replies: Funny you should ask as a paper just arrived which is sure to have the answer and I will read it now....... OK, the morning sky, and the sky in general, is blue due to Rayleigh scattering [which affects short wavelengths the most] of the sun light by air molecules and other microscopic particles.

358

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections 2010--Volume 3: Balancing and A lignment  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2010-12-23T23:59:59.000Z

359

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections -- 2011: Volume 2, Repair Proce dures  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2012-07-31T23:59:59.000Z

360

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections—2007: Volumes 2 and 4 Sup plemental Additions  

Science Conference Proceedings (OSTI)

Up to 70 of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2008-03-27T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections 2010--Volume 4: Turbine Generat or Component Procurement Specifications  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2010-12-23T23:59:59.000Z

362

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections-2006; Volume 4: Turbine-Generat or Component Procurement Specifications  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2007-03-30T23:59:59.000Z

363

Ecological predictive maintenance in urban fleets  

Science Conference Proceedings (OSTI)

Motor vehicles are one of the largest sources of air pollutants worldwide. Several studies had concluded that particulate matter (PM) are responsible for some respiratory, cardiovascular, lung diseases, increasing in death from heart and may cause lung ... Keywords: HMM, degradation, ecological, environmental, exploitation, maintenance, particulate emissions, pollutant emissions, predictive

António Simões; José Torres Farinha; Inácio Fonseca; Luis Ferreira

2010-02-01T23:59:59.000Z

364

Hoisting and Rigging: Inspection and Maintenance Requirements  

E-Print Network (OSTI)

Devices, Slings, and Rigging Hardware and Accessories (SLAC-I-730-0A21S-036) Hoisting and Rigging: PreHoisting and Rigging: Inspection and Maintenance Requirements URL: http://www-group.slac.stanford.edu/esh/eshmanual/references/hoisting Department: Field Safety and Building Inspection Program: Hoisting and Rigging Authority: ESH Manual, Chapter

Wechsler, Risa H.

365

Davis PV plant operation and maintenance manual  

DOE Green Energy (OSTI)

This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

NONE

1994-09-01T23:59:59.000Z

366

Utilities are doing too much breaker maintenance  

Science Conference Proceedings (OSTI)

Many breaker failures occur after the breaker has been torn down for maintenance because some error was made in reassembling it. Utilities now can get a better understanding of circuit breaker reliability as the result of a worldwide survey conducted by the International Conference on Large High-Voltage Electric Systems (Cigre) of the reliability of circuit breakers 63 kV and above. The most significant finding is that the rate of major failures have dropped drastically with the introduction of modern SF[sub 6] breakers (from 1.58 to 0.67 per 100 breaker-years). But the rate of minor failures - such as gas leaks, which require maintenance and add to the operating cost - has increased by 30%. Incorrect maintenance causes far fewer failures in modern breakers, simply because they have to be torn down less frequently. Only 15% as many major failures and 77% as many minor failures can be attributed to incorrect maintenance. The failure to open or close on command are still the dominant major-failure modes of circuit breakers. 4 tabs.

Heising, C. (Reliability Consultant, Wynnewood, PA (United States))

1994-12-01T23:59:59.000Z

367

Incremental computation and maintenance of temporal aggregates  

Science Conference Proceedings (OSTI)

Abstract.We consider the problems of computing aggregation queries in temporal databases and of maintaining materialized temporal aggregate views efficiently. The latter problem is particularly challenging since a single data update can cause aggregate ... Keywords: Access methods, Aggregation, B-tree, Segment tree, Temporal database, View maintenance

Jun Yang; Jennifer Widom

2003-10-01T23:59:59.000Z

368

Constraint capture and maintenance in engineering design  

Science Conference Proceedings (OSTI)

The Designers' Workbench is a system developed by the Advanced Knowledge Technologies Consortium to support designers in large organizations, such as Rolls-Royce, to ensure that the design is consistent with the specification for the particular design ... Keywords: Application Conditions, Capture, Constraints, Design, Maintenance, Rationales

Suraj Ajit; Derek Sleeman; David w. Fowler; David Knott

2008-11-01T23:59:59.000Z

369

Asphalt, Concrete, and Turf Maintenance and Preservation  

E-Print Network (OSTI)

. These tools are: Pavement management programs. A pavement management system is the name given to one in a serviceable condition over a given period of time. One of the primary benefits of a pavement management system maintenance treatment at any time. The large variation in system size and pavement type across the state

Minnesota, University of

370

Operating and maintenance experience in tritium environments  

Science Conference Proceedings (OSTI)

This presentation is a summary of practical experience gained over more than twenty years from analyzing failures of process equipment operated in tritium and deuterium environments. Significant improvements have been achieved in design and procurement of new equipment, testing and selection of materials, and gradually more favorable maintenance experience. Preferred materials and inspection methods are described. 6 tabs.

Tuer, G.L.

1987-01-01T23:59:59.000Z

371

Fifth EPRI International Conference on Maintenance Proceedings  

Science Conference Proceedings (OSTI)

The Fifth EPRI International Conference on Maintenance focused primarily on fossil and nuclear generating assets, but many topics will be applicable to other assets, as well. Equipment manufacturers, vendors, architect/engineers, and consultants will also find this conference prodedings to be informative and valuable.

2005-12-23T23:59:59.000Z

372

ICD Complex Operations and Maintenance Plan  

SciTech Connect

This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

Gibson, P. L.

2007-06-25T23:59:59.000Z

373

Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Maintenance and Safety to someone by E-mail Maintenance and Safety to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Digg Find More places to share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on AddThis.com... More in this section... Natural Gas Basics Benefits & Considerations Stations Vehicles Availability Conversions Emissions Maintenance & Safety

374

Standard Hydrogen Monitoring System-D operation and maintenance manual  

DOE Green Energy (OSTI)

The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System-D (SHMS-D) used in the 200E and 200W area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course No. 351405, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted.

Schneider, T.C.

1997-05-01T23:59:59.000Z

375

Standard hydrogen monitoring system - E operation and maintenance manual  

DOE Green Energy (OSTI)

The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System- E (SHMS-E) used in the 200E and 20OW area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course for SHMS, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted.

Schneider, T.C.

1997-06-01T23:59:59.000Z

376

Resources on Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations & Maintenance » Resources on Operations & Maintenance » Resources on Operations and Maintenance Resources on Operations and Maintenance October 7, 2013 - 9:55am Addthis Many helpful resources about operations and maintenance are available. Also see Contacts. Best Practices Operations and Maintenance Best Practices Guide: Document outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Federal Facilities Council: Website featuring events, reports, and links to National Academy websites. Commissioning Commissioning for Federal Facilities: Comprehensive information about ongoing commissioning processes to resolve operating problems, improve comfort, optimize energy use, and identify retrofits for commercial and

377

Maintenance and repair: a simulation model for field service with condition-based maintenance  

Science Conference Proceedings (OSTI)

In this paper, we consider field service in which service providers are responsible for maintaining equipment performance. To do so, preventive maintenance work is usually required in addition to repairs. Field service managers are often faced with the ...

Yiqing Lin; Arthur Hsu; Ravi Rajamani

2002-12-01T23:59:59.000Z

378

Nuclear Maintenance Applications Center: Generator Maintenance Guide for Emergency Diesel Generators  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) developed this report to address maintenance and improve long-term reliability and availability of generators within nuclear power plant emergency diesel generator (EDG) systems.

2010-12-11T23:59:59.000Z

379

Generation Maintenance Applications Center: Combined-Cycle Combustion-Turbine Static Starting System Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to assist personnel involved with the maintenance of combustion-turbine static start systems, planning, predictive, and preventive maintenance techniques; failure mode information; and troubleshooting guidance.BackgroundAs the fleet of combustion turbines grows, it is critical for the starting systems to be understood and properly maintained in order to ensure the reliability of combustion-turbine generating units and the ...

2013-03-28T23:59:59.000Z

380

Guidelines for Transitioning from Time-Based Maintenance to Condition-Based Maintenance  

Science Conference Proceedings (OSTI)

BackgroundUtilities have provided feedback to the Electric Power Research Institute (EPRI) that they do not feel that they have fully capitalized on past optimization projects. Current living programs using classical predictive maintenance technologies, component and system testing programs, existing maintenance backlogs, system monitoring, system health, and operator feedback to provide a more complete picture of equipment condition may be providing more insight into ...

2013-11-13T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Nuclear Maintenance Applications Center: Passive Component Maintenance Guide for Nuclear Power Plant Personnel  

Science Conference Proceedings (OSTI)

The information contained in this report represents a significant collection of technical and human performance information, including techniques and good practices, related to the design, maintenance, and operation of passive components common at most domestic nuclear power plants. Assemblage of this information provides a single point of reference for plant engineering and maintenance personnel, both in the present and in the future. Through the use of this guideline, in close conjunction with the indu...

2011-11-16T23:59:59.000Z

382

Kalispell Maintenance Headquarters Project : Environmental Assessment and Findings of No Significant Impact.  

SciTech Connect

The facilities needed to maintain and repair Bonneville Power Administration (BPA`s) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area`s maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

United States. Bonneville Power Administration.

1991-12-01T23:59:59.000Z

383

Maintenance and operation of the USDOE Alternative Fuel Center  

DOE Green Energy (OSTI)

The Alternative Fuels Utilization Program (AFUP) of the Office of Energy Efficiency and Renewable Energy has investigated the possibilities and limitations of expanded scope of fuel alternatives and replacement means for transportation fuels from alternative sources. Under the AFUP, the Alternative Fuel Center (AFC) was created to solve problems in the DOE programs that were grappling with the utilization of shale oil and coal liquids for transportation fuels. In year one of this contract, a timeline was set to coordinate uses and operations of the AFC hydrogenation pilot plant among test fuels production project work, facility maintenance, other government work, and work for industry for second-generation operations. In year two, consistent with assisting the AFUP in accomplishing its general goals, the work was done with fuel producers, regulators, and users in mind. AFC capabilities and results were disseminated through tours and outside presentations.

Erwin, J.; Moulton, D.S.; Hetrick, D.L. [Southwest Research Inst., San Antonio, TX (United States)] [Southwest Research Inst., San Antonio, TX (United States)

1994-08-01T23:59:59.000Z

384

Feasibility study for a transportation operations system cask maintenance facility  

SciTech Connect

The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1991-01-01T23:59:59.000Z

385

U-206: WordPress Flaws Permit Cross-Site Scripting, Cross-Site Request  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: WordPress Flaws Permit Cross-Site Scripting, Cross-Site 6: WordPress Flaws Permit Cross-Site Scripting, Cross-Site Request Forgery, and Information Disclosure Attacks U-206: WordPress Flaws Permit Cross-Site Scripting, Cross-Site Request Forgery, and Information Disclosure Attacks July 6, 2012 - 7:00am Addthis PROBLEM: WordPress Flaws Permit Cross-Site Scripting, Cross-Site Request Forgery, and Information Disclosure Attacks PLATFORM: Version(s): prior to 3.4.1 ABSTRACT: Several vulnerabilities were reported in WordPress. A remote authenticated user can conduct cross-site scripting attacks. A remote user can conduct cross-site request forgery attacks. A remote authenticated user can obtain potentially sensitive information. reference LINKS: The Vendor's Advisory WordPress 3.4.1 Maintenance and Security Release SecurityTracker Alert ID: 1027219

386

Operations and Maintenance Team | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Team Operations and Maintenance Team October 16, 2013 - 5:00pm Addthis Assembling the right set of skills and resources to operate and maintain a renewable energy system is critical. Renewable energy technologies only perform as specified when managed by a well-trained, highly motivated operations and maintenance (O&M) team. For a renewable energy project financed through an energy savings performance contract (ESPC) or a power purchase agreement (PPA), primary O&M services are typically delivered as part of the agreement, but in-house staff will need some familiarity with the system. For agency-funded projects, O&M services may be provided by in-house facilities staff, a contracted service provider, or a combination of the two. Experienced O&M staff can provide valuable input and should be included in

387

Site Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Beamlines Beamlines Directory Beam Status Research Techniques Schedules Photon Source Parameters Storage Ring Parameters News & Publications ALSNews General Publications...

388

Insights From EPRI Maintenance Rule Projects  

Science Conference Proceedings (OSTI)

The new NRC Maintenance Rule poses numerous challenges and opportunities for utilities due to its risk- and performance-based approach. This report provides many examples of problems and their solutions in the implementation of this regulation at several nuclear power plants. A comprehensive treatment of the technical basis for three troublesome areas of the rule--risk significance measures, performance criteria, and the balance between reliability and availability--is also provided to increase utility c...

1996-06-27T23:59:59.000Z

389

Axial Compressor Performance Maintenance Guide Update  

Science Conference Proceedings (OSTI)

To deal with volatile fuel prices and growing pressures to limit greenhouse gas (GHG) emissions, combustion turbine (CT) operators are striving for maximum fuel efficiency. The axial compressor is a leading cause of short term and long term CT efficiency losses due to fouling, corrosion, and erosion. This report reviews the technology being advanced for compressor maintenance to achieve improved compressor and the CT efficiencies.

2005-02-21T23:59:59.000Z

390

Machine Maintenance Integrated Performance Support System  

SciTech Connect

The objectives of this partnership project were to develop a preventive maintenance checklist program, a troubleshooting system for the Vertical Turning Center (VTC)-5, an on-line manual, and to integrate these components with a custom browser that would run on the VTC-5 machine's controller and would support future internet/intranet delivery. Kingsbury provided subject matter experts from engineering, manufacturing, and technical support. They also provided photographs, schematics, and CAD drawings, which AlliedSignal Federal Manufacturing and Technologies (ASFM and T) digitized for use in the final program. Information from The Kingsbury troubleshooting experts were interviewed regarding symptoms and root causes of system malfunctions This knowledge was captured and from it, fault trees were developed. These trees were then incorporated into the EPSS as a troubleshooting tool. The troubleshooting portion of the system presents simple questions to the machine operator in order to determine the likely cause or causes of malfunctions and then recommends systematic corrective actions. The on-line reference manual, covering operations and maintenance, provides text and illustrations to the machine operator in a traditional structure, but additionally offers the capability to search voluminous amounts of technical data and retrieve specific information on request. The maintenance portion of the EPSS includes checklists that are displayed daily, weekly, monthly, and annually, as appropriate, on the VTC-5 controller screen. The controller software is unavailable for machining parts until the machine tool operator goes through and checks off all of the checklist items. This project provided the team with a detailed understanding of the knowledge and information required to produce and support advanced machine tools. In addition, it resulted in the design and construction of a prototype VTC-5 EPSS containing all the logic and interfaces necessary to integrate operations and maintenance information from other Kingsbury machine tools.

Bohley, M.C.; Schwartz, M.E.

1998-03-11T23:59:59.000Z

391

HVAC Fans and Dampers Maintenance Guide  

Science Conference Proceedings (OSTI)

Heating, ventilation, and air conditioning (HVAC) systems serve an important function in nuclear power plants because these systems are responsible for maintaining many environmental conditions throughout the facility. Failure of these components can induce undesirable radiological conditions and stressful working conditions, and can compromise the life of qualified equipment. Some HVAC fan and damper failures are preventable by monitoring operating parameters and performing recommended maintenance activ...

1999-08-26T23:59:59.000Z

392

Risk-Informed Maintenance Decision Analysis Methodology  

Science Conference Proceedings (OSTI)

Capabilities and proposed features of a risk-informed fossil plant maintenance planning process are described in this report. This research will serve as the basis for the development of a software module deployed in enterprise asset management systems, such as the Electric Power Research Institute's (EPRI's) PlantView suite. The report provides background on how risk-informed decisions can lead to improved plant availability by prioritizing activities based on component failure modes, probabilities, and...

2007-12-20T23:59:59.000Z

393

Surveillance & Maintenance: The Requirements Based Surveillance and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Surveillance & Maintenance: The Requirements Based Surveillance and Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in mission and operation of an excess facility should stimulate a review of surveillance and maintenance to determine what efficiencies can be gained as a result of the change. Such a review can be applied to facilities that undergoing stabilization, those intended for deactivation, and others destined for decommissioning. The material that follows provides

394

Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ryder Opens Natural Ryder Opens Natural Gas Vehicle Maintenance Facility to someone by E-mail Share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Facebook Tweet about Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Twitter Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Google Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Delicious Rank Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Digg Find More places to share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on AddThis.com... June 28, 2011 Ryder Opens Natural Gas Vehicle Maintenance Facility

395

SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AND MAINTENANCE AND MAINTENANCE RBSM The Requirements Based Surveillance and Maintenance Review Process Surveillance and Maintenance Overview What is RBSM and why do I need this process? Who has used this process so far? A Summary of RBSM results across the DOE complex Viewing a sample RBSM report Performing RBSM at your facility RBSM Guidance package Surveillance and Maintenance Overview Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in mission and operation of an excess facility should stimulate a review of surveillance and maintenance to determine what efficiencies can be gained as a result of the change.

396

AWEA Wind Project Operations and Maintenance and Safety Seminar...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Operations and Maintenance and Safety Seminar AWEA Wind Project Operations and Maintenance and Safety Seminar January 15, 2014 8:00AM EST to January 16, 2014 5:00PM EST San...

397

Rapid modeling of field maintenance using discrete event simulation  

Science Conference Proceedings (OSTI)

Discrete event simulation has been applied to a wide range of applications areas due to its ability to represent stochastic systems over time. Maintenance, particularly field maintenance, is complex due to the interaction of different sub-systems of ...

Abdullah A. Alabdulkarim; Peter D. Ball; Ashutosh Tiwari

2011-12-01T23:59:59.000Z

398

Pulverizer Maintenance Guide, Volume 1: Raymond Bowl Mills  

Science Conference Proceedings (OSTI)

This guide provides fossil plant personnel with current maintenance information on the Alstom Raymond Bowl mills and will assist a plant in improving the maintenance of the pulverizer mills.

2004-08-27T23:59:59.000Z

399

Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

CNG Fuel System and CNG Fuel System and Cylinder Maintenance to someone by E-mail Share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Facebook Tweet about Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Twitter Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Google Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Delicious Rank Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Digg Find More places to share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on AddThis.com... More in this section... Natural Gas Basics Benefits & Considerations Stations Vehicles Availability Conversions Emissions Maintenance & Safety

400

Maintenance Guide for DOE Low-Level Waste Disposal Facility  

Energy.gov (U.S. Department of Energy (DOE))

Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal  Facility Performance Assessments and Composite Analyses

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Nuclear Maintenance Applications Center: Knowledge Transfer Improvement Project  

Science Conference Proceedings (OSTI)

The Nuclear Maintenance Application Center has begun a project a project to explore ways to improve how our products can be more easily used by our members and, in particular, the benefit that can be derived by the worker in the field. The project focuses on developing methods for improving the delivery of information that is specifically directed at maintenance tasks that are performed as part of preventive or corrective maintenance on plant equipment. The results are intended to benefit the maintenance...

2010-12-23T23:59:59.000Z

402

Maintenance and Operations study for K basins sludge treatment  

SciTech Connect

This study evaluates maintenance and operating concepts for the chemical treatment of sludge from the 100 K Basins at Hanford. The sludge treatment equipment that will require remote operation or maintenance was identified. Then various maintenance and operating concepts used in the nuclear industry were evaluated for applicability to sludge treatment. A hot cell or cells is recommended as the best maintenance and operating concept for a sludge treatment facility.

WESTRA, A.G.

1998-11-30T23:59:59.000Z

403

Safety, Capacity, Maintenance and Major Repairs (SCMMR) ...  

Science Conference Proceedings (OSTI)

... repairing and replacing aging mechanical and electrical ... and replacing or upgrading site utility systems; ... will avoid costly infrastructure failures such ...

2010-10-05T23:59:59.000Z

404

Safety, Capacity, Maintenance, and Major Repair  

Science Conference Proceedings (OSTI)

... Continue repairing or replacing aging utility systems, exhaust and air ... Continue improvements to site infrastructure, including roads, loading docks ...

2010-10-05T23:59:59.000Z

405

A contextual semantic mediator for a distributed cooperative maintenance platform  

E-Print Network (OSTI)

platforms, Enterprise Asset Management Systems or CMMS (Computerized Maintenance Management System). Most the semantic mediator system for the platform of maintenance management. According to Wache et al in [24 and S2 two systems integrated in the maintenance platform. S1 is a system managing interventions

Paris-Sud XI, Université de

406

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES  

E-Print Network (OSTI)

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES DONALD H. GRAHAM Operations. The discussion will focus on the management, operation, and maintenance systems nec essary to support long maintenance management pro gram (j) cost accounting and a record keeping system to provide timely, accurate

Columbia University

407

Design Area for Assistance to Maintenance based on Augmented Reality  

E-Print Network (OSTI)

ARM (Augmented Reality Maintenance) and the FC SDBM (System of Database Management) (Fig.6): 1)The FC instruction. In this paper, we propose a design process of the maintenance system focused on the analysis-through Head Mounted Display (HMD). The technician of maintenance, when using this system, can interact

Paris-Sud XI, Université de

408

Maintenance policy: degradation laws versus Hidden Markov Model availability indicator  

E-Print Network (OSTI)

industry). Keywords: diagnosis, maintenance management, assessment, degradation laws, Hidden Markov Model 1 to manager strategies. In case of preventive maintenance, different strategies should be used like planned of the system. They use stochastic Petri nets and Markov chains to implement various maintenance strategies

Paris-Sud XI, Université de

409

Feedwater Pump Turbine Controls and Oil System Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to personnel involved in the mechanical hydraulic controls (MHCs) of the feedwater pump turbine (FWPT), its associated components, and inherent oil system, including good maintenance practices, condition monitoring, predictive and preventive maintenance techniques, probable failure modes, and troubleshooting guidance. The guide was developed to provide maintenance and troubleshooting information as well as a basic background in mechanical hydraulic controls.

2001-12-20T23:59:59.000Z

410

Princeton Site Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Princeton Site Office Princeton Site Office P.O. Box 102 Princeton, New Jersey 08542-0102 JAN 18 2012 To: Timothy G. Lynch , Acting General Counsel Subject: Princeton Site Office (PSO) 2012 Annual National Environmental Policy Act (NEPA) Planning Summary Section 5(a)(7) of DOE Order 451 .1 B Change 2, NEPA Compliance Program , requires each Secretarial Officer and Head of Field Organization to submit an annual NEPA Planning Summary to the General Counsel. We have reviewed your associated December 5, 2011 , memorandum and in consultation with Princeton Plasma Physics Laboratory (PPPL) staff determined that we have no Environmental Impacts Statements or Environmental Assessments either ongoing or forecast for the next 12 to 24 months. If you have any questions or need additional information

411

FACILITIES MAINTENANCE & UPKEEP The Lawrence campus is operating three different custodial and maintenance groups on campus resulting in  

E-Print Network (OSTI)

facilities management system, and provide the adequate tools and training necessary. · Implementing contemporary zone maintenance will reduce management and layers, enabling costFACILITIES MAINTENANCE & UPKEEP Context · The Lawrence campus is operating three

Peterson, Blake R.

412

Contract and beyond GEMnet status and accomplishments: GSA's energy and maintenance network  

E-Print Network (OSTI)

systems, building maintenance management systems, and energyof the computerized maintenance management systems. We thenwith a centralized maintenance management system (both for

Piette, Mary Ann; Kinney, Satkartar; Levi, Mark; McBride, David; May, Stephen

2002-01-01T23:59:59.000Z

413

ITS Hardware Maintenance Management Systems: White Paper for MORIP Pooled Fund Study  

E-Print Network (OSTI)

an ITS hardware maintenance management system. It can aid inITS Hardware Maintenance Management Systems: White Paper forITS HARDWARE MAINTENANCE MANAGEMENT SYSTEMS WHITE PAPER For

Kuhn, Beverly T.; Durkop, Brooke R.

2001-01-01T23:59:59.000Z

414

Adaptive Optimization and Systematic Probing of Infrastructure System Maintenance Policies under Model Uncertainty  

E-Print Network (OSTI)

maintenance and repair policies in infrastructure managementOptimal maintenance decisions for pavement management. ” J.Maintenance; Optimization; Probabilistic models; Adaptive systems; Uncertainty principles . Introduction Infrastructure management

Madanat, S M; Park, Sejung; Kuhn, K D

2006-01-01T23:59:59.000Z

415

ITS Hardware Maintenance Management Systems: White Paper for MORIP Pooled Fund Study  

E-Print Network (OSTI)

of an ITS hardware maintenance management system. It can aidBERKELEY ITS Hardware Maintenance Management Systems: WhiteHIGHWAYS ITS HARDWARE MAINTENANCE MANAGEMENT SYSTEMS WHITE

Kuhn, Beverly T.; Durkop, Brooke R.

2001-01-01T23:59:59.000Z

416

Database Maintenance, Data Sharing Policy, Collaboration  

SciTech Connect

Scientific questions of today are now more global than ever before. The answers to these questions are buried within multiple disciplines and across a diverse range of scientists and institutions. The expanse and complexity of data required by researchers often exceed the means of a single scientist. Data sharing in the form of its distributed collection and analysis is increasingly common. Collective research now takes place in what may be called 'collaboratories' or in 'centers without walls' (Clery 2006). Creating effective artifacts, which enable scientists to collaborate on data analyses, continues to be a significant challenge for today's science activities. It is rare that providing a file system abstraction on distributed data enables acceleration of scientific discoveries. By explicitly identifying and addressing the different requirements for data contributors, data curators, and data consumers, we can create a data management architecture which enables the creation of datasets that evolve over time with growing and changing data, data annotations, participants, and use rules. This involves also a crucial contribution by the teams and people collecting the data, that in addition to carefully acquire and process the measurements and to be ready to share their measurements within the scientific community, need to follow general rules that help to make their data well documented and safely stored and to maximize visibility to their works and sites. In this chapter, we provide examples of the types of functions and capabilities typically provided within the data management systems, focusing in particular on databases structures and characteristics, data practices, and data user services. Finally, the importance and advantages of collective efforts like data sharing for synthesis activities and the relative data policy options are discussed and analyzed.

Papale, D. [University of Tuscia; Agarwal, D.A [Lawrence Berkeley National Laboratory (LBNL); Baldocchi, D. D. [University of California, Berkeley; Cook, Robert B [ORNL; Fisher, J.B. [Jet Propulsion Laboratory, Pasadena, CA; Ingen, C. van [Microsoft Research

2012-01-01T23:59:59.000Z

417

INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY 2005  

SciTech Connect

This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during fiscal year 2005. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document. Waste Area Groups 7 and 8 are not reported in this document. Waste Area Group 7 is an operating facility, and the status of its operations is reported directly to the regulatory agencies. Waste Area Group 8 is excluded from this report, because it falls outside the direct control of U.S. Department of Energy Idaho Operations Office. The INEEL Sitewide Institutional Controls Plan discusses the inspection, maintenance, repair, and reporting activities involving institutional controls at the Idaho National Laboratory Site. Therefore, the maintenance of institutional controls is not discussed in this report. The Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan provides a reference to support this report by providing current and projected facility and land uses and by listing the Comprehensive Environmental Response, Compensation, and Liability Act sites.

D. R. Fitch

2005-09-22T23:59:59.000Z

418

Sacandaga Site  

Office of Legacy Management (LM)

and NYSDOH to certify the,,property for unrestricted use. :: '). c Backsround The General Electric Company operated the Sacandaga Atomic Power Laboratory for the Atomic Energy...

419

Site Lead TQP Standard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Qualification Standard for the Qualification Standard for the Office of Safety and Emergency Management Evaluations Site Lead Program May 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy 1 Qualification Standard for the Office of Safety and Emergency Management Evaluations Site Lead Program A Site Lead is an individual, normally at a senior General Schedule (GS) level or Excepted Service, who is assigned the responsibility to assess and evaluate management systems, safety and health programs, and technical activities associated with U.S. Department of Energy (DOE) nuclear and non-nuclear facilities. Typically, a Site Lead has previously qualified as a Nuclear Safety Specialist or a Senior Technical Safety Manager. For exceptionally qualified individuals,

420

Federal Energy Management Program: Operations and Maintenance for Major  

NLE Websites -- All DOE Office Websites (Extended Search)

for Major Equipment Types to someone by E-mail for Major Equipment Types to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Google Bookmark Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Delicious Rank Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 5 Types of Maintenance Programs Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from failing or to repair normal equipment degradation experienced with the operation of the device to keep it in proper working order. Unfortunately, data obtained in many studies over the past decade indicates that most private and government facilities do not expend the necessary resources to maintain equipment in proper working

422

Operations & Maintenance Best Practices Guide: Release 3.0  

NLE Websites -- All DOE Office Websites (Extended Search)

Chapter 5 Types of Maintenance Programs Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from failing or to repair normal equipment degradation experienced with the operation of the device to keep it in proper working order. Unfortunately, data obtained in many studies over the past decade indicates that most private and government facilities do not expend the necessary resources to maintain equipment in proper working

423

Solar Water Heating System Maintenance and Repair | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Heating System Maintenance and Repair Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Solar energy systems require periodic inspections and routine maintenance to keep them operating efficiently. Also, from time to time, components may need repair or replacement. You should also take steps to prevent scaling, corrosion, and freezing. You might be able to handle some of the inspections and maintenance tasks on your own, but others may require a qualified technician. Ask for a cost estimate in writing before having any work done. For some systems, it may

424

Plant maintenance and outage management issue, 2005  

SciTech Connect

The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

Agnihotri, Newal (ed.)

2005-01-15T23:59:59.000Z

425

Plant maintenance and advanced reactors issue, 2004  

SciTech Connect

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Optimism about the future of nuclear power, by Ruth G. Shaw, Duke Power Company; Licensed in three countries, by GE Energy; Enhancing public acceptance, by Westinghouse Electric Company; Standardized MOV program, by Ted Neckowicz, Exelon; Inservice testing, by Steven Unikewicz, U.S. Nuclear Regulatory Commission; Asian network for education, Fatimah Mohd Amin, Malaysian Institute for Nuclear Technology Research; and, Cooling water intake optimization, by Jeffrey M. Jones and Bert Mayer, P.E., Framatome ANP.

Agnihotri, Newal (ed.)

2004-09-15T23:59:59.000Z

426

HANFORD SITE WELDING PROGRAM SUCCESSFULLY PROVIDING A SINGLE SITE FUNCTION FOR USE BY MULTIPLE CONTRACTORS  

SciTech Connect

The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

CANNELL GR

2009-11-19T23:59:59.000Z

427

INL SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS  

SciTech Connect

On November 9, 2002, the U.S. Environmental Protection Agency, the U.S. Department of Energy, and the Idaho Department of Environmental Quality approved the 'Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites', which required a Site-wide institutional controls plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. This revision identifies and consolidates the institutional controls and operations and maintenance requirements into a single document.

JOLLEY, WENDELL L

2008-02-05T23:59:59.000Z

428

INL SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS  

SciTech Connect

On November 9, 2002, the U.S. Environmental Protection Agency, the U.S. Department of Energy, and the Idaho Department of Environmental Quality approved the 'Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites', which required a Site-wide institutional controls plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. This revision identifies and consolidates the institutional controls and operations and maintenance requirements into a single document.

JOLLEY, WENDELL L

2008-02-05T23:59:59.000Z

429

UW Madison Fleet Fiscal Year 2010 Rates: Fuel, maintenance and insurance costs are included. If fuel prices exceed the budgeted  

E-Print Network (OSTI)

UW Madison Fleet Fiscal Year 2010 Rates: Fuel, maintenance and insurance costs are included. If fuel prices exceed the budgeted amount by a significant margin, the rates will be amended with a fuel surcharge at that time and the change notice will be posted in the fleet web site, rates page. Some rate

Sheridan, Jennifer

430

Probabilistic safety assessment and reliability based maintenance policies: application to the emergency diesel generators of a nuclear power plant  

Science Conference Proceedings (OSTI)

This study is performed on the four 2.5 MWe emergency diesel generator (EDG) sets of Hydro-Quebec Gentilly-2 Nuclear Power Station. EDGs are safety related systems for the case of the loss of off-site power. This study establishes the basis of an enhanced ... Keywords: emergency diesel generator, maintenance policy, probabilistic safety assessment

Georges Abdul-Nour; Michel Demers; Raynald Vaillancourt

2002-06-01T23:59:59.000Z

431

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

or the general public under current conditions of site usage. . 1 U.S. Department of Energy Guidelines for Residual Radioactivity at Formerly Utilized Sites Remedial Action...

432

Hanford Site  

NLE Websites -- All DOE Office Websites

Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Contacts Hours Current NWS Forecast for the Tri-Cities NWS...

433

Medical Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

Medical Sites Name: Jenielle Location: NA Country: NA Date: NA Question: I started itching Aug. 1999. Diagnosed with ITP Oct.1999. I am in remission With a platelet count in...

434

A cask maintenance facility feasibility study  

SciTech Connect

The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1989-01-01T23:59:59.000Z

435

Nuclear Maintenance Applications Center: Guidelines for the Maintenance Management of Plant Sensors  

Science Conference Proceedings (OSTI)

This report was produced to provide tutorial guidance to the new engineer or technician about the principal sensors found in a typical nuclear plant. Furthermore, it provides analysis of problems that might be encountered and presents the testing recommended as a strategy for sensor maintenance.

2010-12-23T23:59:59.000Z

436

Nuclear Maintenance Applications Center: Guideline for Cooling Tower Inspection and Maintenance  

Science Conference Proceedings (OSTI)

Cooling tower structural failures have recently become a focus area for the nuclear industry based on events that have resulted in lost generation as well as high repair costs. Environmental concerns regarding thermal pollution and water usage have also recently increased the need for guidance for cooling tower inspection and maintenance.

2011-06-06T23:59:59.000Z

437

History-Dependent Optimization of Bridge Maintenance and Replacement Decisions Using Markov Decision Process  

E-Print Network (OSTI)

management systems to assist agencies to make maintenance andmanagement system in order to optimize the allocation of resources for maintenance

Robelin, Charles-Antoine; Madanat, Samer M

2007-01-01T23:59:59.000Z

438

General Employee Radiological Training  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE HANDBOOK GENERAL EMPLOYEE RADIOLOGICAL TRAINING U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Not Measurement Sensitive This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ DOE-HDBK-1131-2007 iii Foreword This Handbook describes an implementation process for core training as recommended in chapter 14, Radiation Safety Training, of Implementation Guide G44.1B, Radiation Protection Programs Guide, and as outlined in the DOE Radiological Control Standard [RCS - DOE-STD-1098-99, Ch. 1]. The Handbook is meant to assist those individuals

439

Categorical Exclusion Determinations: Pacific Northwest Site Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pacific Northwest Site Office Pacific Northwest Site Office Categorical Exclusion Determinations: Pacific Northwest Site Office Categorical Exclusion Determinations issued by Pacific Northwest Site Office. DOCUMENTS AVAILABLE FOR DOWNLOAD July 16, 2012 CX-009099: Categorical Exclusion Determination Routine Maintenance CX(s) Applied: B1.3, B1.4, B1.8, B1.16, B1.17 Date: 07/16/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office June 28, 2012 CX-009097: Categorical Exclusion Determination U.S. Customs and Border Protection High-Energy Radiography Test Capability CX(s) Applied: B3.10, B3.11 Date: 06/28/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office May 18, 2012 CX-009096: Categorical Exclusion Determination U.S. Customs and Border Protection Non-Intrusive Inspection Tests

440

Two Controlled Experiments Assessing the Usefulness of Design Pattern Documentation in Program Maintenance  

E-Print Network (OSTI)

Using design patterns is claimed to improve programmer productivity and software quality. Such improvements may manifest both at construction time (in faster and better program design) and at maintenance time (in faster and more accurate program comprehension). This paper focuses on the maintenance context and reports on experimental tests of the following question: Does it help the maintainer if the design patterns in the program code are documented explicitly (using source code comments), compared to a well-commented pro- gram without explicit reference to design patterns? Subjects performed maintenance tasks on two programs ranging from 360 to 560 LOC including comments. Both programs contained design patterns. The controlled variable was whether the use of de- sign patterns was documented explicitly or not. The experiments thus tested whether pattern com- ment lines (PCL) help during maintenance if pat- terns are relevant and sufficient program comments are already present. It turns out that this question is a challenge for the experimental methodology: a setup leading to relevant results is quite difficult to find. We discuss these issues in detail and suggest a general approach to such situations.

Lutz Prechelt; Barbara Unger; Michael Philippsen; Walter Tichy

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING  

Science Conference Proceedings (OSTI)

The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

Harris, S.; Gross, R.; Mitchell, E.

2011-01-18T23:59:59.000Z

442

Site Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Home » Site Map Home » Site Map Site Map Home About Overview NERSC Mission Contact us Staff Center Leadership Sudip Dosanjh Select Publications Jeff Broughton Katie Antypas John Shalf Francesca Verdier Center Administration James Craw Norma Early Jeff Grounds Betsy MacGowan Zaida McCunney Lynn Rippe Suzanne Stevenson David Tooker Center Communications Jon Bashor Linda Vu Margie Wylie Kathy Kincade Advanced Technologies Group Nicholas Wright Brian Austin Research Projects Matthew Cordery Christopher Daley Analytics Group Peter Nugent David Camp Hank Childs Harinarayan Krishnan Burlen Loring Joerg Meyer Prabhat Oliver Ruebel Daniela Ushizima Gunther Weber Yushu Yao Computational Systems Group Jay Srinivasan James Botts Scott Burrow Tina Butler Nick Cardo Tina Declerck Ilya Malinov David Paul Larry Pezzaglia Iwona Sakrejda

443

Pacific Northwest National Laboratory Grounds Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pacific Pacific Northwest National Laboratory (PNNL) operates an award-winning grounds maintenance program that comprises a comprehensive landscape and irrigation management program. The program has helped the laboratory reduce its water use for irrigation by 30%. PNNL is located in Richland, Washington, and is managed and operated by Battelle for the U.S. Department of Energy (DOE). PNNL scientists and engineers perform research on a variety of subjects, including energy and national security. PNNL has more than 4,200 staff members, sits on 600 acres, and houses 2 million square feet of facilities. The laboratory is located in an arid region of the state, receiving only eight inches of precipitation annually. It has more than 100 acres of turf and landscaped areas and

444

Plant maintenance and advanced reactors, 2005  

SciTech Connect

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: First U.S. EPRs in 2015, by Ray Ganthner, Framatome ANP; Pursuing several opportunities, by William E. (Ed) Cummins, Westinghouse Electric Company; Vigorous plans to develop advanced reactors, by Yuliang Sun, Tsinghua University, China; Multiple designs, small and large, by Kumiaki Moriya, Hitachi Ltd., Japan; Sealed and embedded for safety and security, by Handa Norihiko, Toshiba Corporation, Japan; Scheduled online in 2010, by Johan Slabber, PMBR (Pty) Ltd., South Africa; Multi-application reactors, by Nikolay G. Kodochigov, OKBM, Russia; Six projects under budget and on schedule, by David F. Togerson, AECL, Canada; Creating a positive image, by Scott Peterson, Nuclear Energy Institute (NEI); Advanced plans for nuclear power's renaissance, by John Cleveland, International Atomic Energy Agency, Austria; and, Plant profile: last five outages in less than 20 days, by Beth Rapczynski, Exelon Nuclear.

Agnihotri, Newal (ed.)

2005-09-15T23:59:59.000Z

445

An automated neutron monitor maintenance system  

Science Conference Proceedings (OSTI)

Neutron detectors are commonly used by the nuclear materials processing industry to monitor fissile materials in process vessels and tanks. The proper functioning of these neutron monitors must be periodically evaluated. We have developed and placed in routine use a PC-based multichannel analyzer (MCA) system for on-line BF3 and He-3 gas-filled detector function testing. The automated system: 1) acquires spectral data from the monitor system, 2) analyzes the spectrum to determine the detector`s functionality, 3) makes suggestions for maintenance or repair, as required, and 4) saves the spectrum and results to disk for review. The operator interface has been designed to be user-friendly and to minimize the training requirements of the user. The system may also be easily customized for various applications

Moore, F.S.; Griffin, J.C.; Odell, D.M.C.

1996-09-01T23:59:59.000Z

446

Plant maintenance and advanced reactors, 2007  

Science Conference Proceedings (OSTI)

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: A new day for energy in America; Committed to success more than ever, by Andy White, GE--Hitachi Nuclear Energy; Competitive technology for decades, by Steve Tritch, Westinghouse Electric Company; Pioneers of positive community relationship, by Exelon Nuclear; A robust design for 60-years, by Ray Ganthner, Areva; Aiming at no evacuation plants, by Kumiaki Moriya, Hitachi-GE Nuclear Energy, Ltd.; and, Desalination and hydrogen economy, by Dr. I. Khamis, International Atomic Energy Agency. Industry innovation articles in this issue are: Reactor vessel closure head project, by Jeff LeClair, Prairie Island Nuclear Generating Plant; and Submersible remote-operated vehicle, by Michael S. Rose, Entergy's Fitzpatrick Nuclear Station.

Agnihotri, Newal (ed.)

2007-09-15T23:59:59.000Z

447

Development of Low-Maintenance Protection and Control Systems  

Science Conference Proceedings (OSTI)

Protection and control (P&C) system maintenance is a critical task and requirement for the reliability of power grid. Traditionally, electro-mechanic devices require regular calibration and maintenance for proper operations. Thus, time-based maintenance programs have been developed by utilities and have not changed much even after the industry migrated to the microprocessor and communication-based digital protection technologies. The Electric Power Research Institute (EPRI) Protection and Control Task Fo...

2011-12-13T23:59:59.000Z

448

Reliability Centered Maintenance (RCM) Technical Reference for Power Delivery  

Science Conference Proceedings (OSTI)

This technical reference expands on the original reliability centered maintenance (RCM) research performed by EPRI in the late 1990s. It incorporates nearly ten years of utility RCM experience in power delivery and emphasizes the requirements of managing and measuring maintenance programs. RCM's overall goal is to improve the economic posture of a utility by promoting cost-effective application of maintenance resources. This "Technical Reference for Power Delivery" serves as the "handbook" of RCM for the...

2003-12-10T23:59:59.000Z

449

Streamlined Reliability-Centered Maintenance (SRCM) Implementation Guidelines, Volume 3  

Science Conference Proceedings (OSTI)

Following EPRI's philosophy to use and expand existing technology if it makes economic sense, EPRI's Plant Maintenance Optimization (PMO) Target has adopted a reliability-centered maintenance (RCM) process called SRCM. SRCM provides a utility a cost-effective process to determine the optimum maintenance strategy for plant systems and equipment based on importance to business objectives. SRCM maintains all the basic steps of traditional RCM.

1999-12-03T23:59:59.000Z

450

Predictive Maintenance Self-Assessment Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

There is a need at nuclear power plants for optimization and continuous improvement in the predictive maintenance (PdM) process. This need is based upon increased reliance on PdM to contribute to low unplanned capability loss factors, prevent significant equipment failures, reduce resources for maintenance, manage assets in support of license renewal and aging control, incorporate new technologies and advanced information management, and manage the risk associated with maintenance activities. This docume...

2000-11-28T23:59:59.000Z

451

Guidelines on the Effects of Cycling Operation on Maintenance Activities  

Science Conference Proceedings (OSTI)

Cyclic operation can result in an increase in forced outage rates, higher operation and maintenance (O&M) costs, and further wear and tear on components due to additional overhauls and maintenance. Such operation may also increase unforeseen costs due to additional personnel training requirements and the use of more sophisticated evaluation and inspection techniques. These guidelines are intended to help plant operators and engineers assess the impact of cycling on maintenance activities and take appropr...

2001-12-10T23:59:59.000Z

452

Microsoft Word - Site Selection  

NLE Websites -- All DOE Office Websites (Extended Search)

Selection Selection One of the very first tasks of General Leslie Groves and the Manhattan Project in early 1943 was to locate and acquire sites in the United States where uranium and plutonium could be produced, as well as a site where the atomic bomb actually would be constructed. Production of uranium and plutonium required vast amounts of power. Thus, Oak Ridge, Tennessee, and Hanford, Washington, were chosen because of proximity to major rivers. Oak Ridge could draw on the power of the hydroelectric plants on the Tennessee River. Hanford could use the power from the Columbia River. The cold waters of the Columbia also could be used to cool the plutonium production reactors at Hanford. A third site, with

453

Station Living Program, RCM, and the maintenance rule  

Science Conference Proceedings (OSTI)

A project is being conducted at Boston Edison's Pilgrim nuclear power station (PNPS) to develop, implement, and demonstrate the effectiveness of a Station Living Program and the US Nuclear Regulatory Commission (NRC) maintenance rule. This project is a collaborative effort by PNPS, the Electric Power Corp, and Quadrex Energy Series Corporation. In parallel, a preventive maintenance optimization project utilizing reliability-centered maintenance (RCM) is being performed on [approximately]90% of the plant's systems. These two projects are being combined as a major cornerstone at PNPS in the implementation of the NRC maintenance rule.

Kleam, J. (Boston Edison Co., Plymouth, MA (United States)); Anderson, J. (Quadrex Energy Services Corp., Campbell, CA (United States))

1993-01-01T23:59:59.000Z

454

O&M First! Facility Metering for Improved Operations, Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Fact Sheet Facility Metering for Improved Operations, Maintenance, and Efficiency Metering and sub-metering of energy and resource use is a critical component of a comprehensive...

455

Long-Term Surveillance and Maintenance at Rocky Flats: Early...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

at Rocky Flats: Early Experiences and Lessons Learned Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned Long-Term Surveillance and...

456

Energy and Maintenance Cost Savings Review at Several US ...  

Science Conference Proceedings (OSTI)

Presentation Title, Energy and Maintenance Cost Savings Review at Several US ... Weight-Time Curves Generated with the PoDFA / Prefil® Footprinter Method.

457

Using Neural Networks in the Maintenance and Operations REcommender...  

NLE Websites -- All DOE Office Websites (Extended Search)

using Neural Networks. By integrating the information from Computerized Maintenance Management Systems (CMMS) and Energy Managementand Control System(EMCS), MORE can analyze and...

458

An Immune Algorithm for the Optimal Maintenance of New ...  

Science Conference Proceedings (OSTI)

1 Department of Industrial Management, National Formosa University ... In the past decades, the maintenance of systems/components is always one of the.

459

Summer maintenance affects North Sea crude oil production and ...  

U.S. Energy Information Administration (EIA)

Wind › Geothermal › ... Each summer, maintenance on offshore production platforms and pipelines in the North Sea temporarily reduces the supply of North Sea crude ...

460

Overview of the Second Quarter 2011 Surveillance and Maintenance...  

Office of Legacy Management (LM)

Maintenance and optimization of pilot air stripper No freezing observed Reduced solar availability reduced power available, causing pump to stop Resolved power issues...

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Federal Facilities Maintenance, Repair Report Calls for Action  

SciTech Connect

This article is an overview of a recent report by the Federal Facilities Council on "Predicting Outcomes from Investments in Maintenance and Repair of Federal Facilities."

Bartlett, Rosemarie

2012-10-01T23:59:59.000Z

462

Preventive Maintenance of Transport Vehicles: Is It Improving ...  

Science Conference Proceedings (OSTI)

After 10 years of experience with running state of the art maintenance practices in Russia, India and ... A MIMO Modeling Strategy for Bath Chemistry · A Study of ...

463

New Services for Building Maintenance Enabled by Building Automation...  

NLE Websites -- All DOE Office Websites (Extended Search)

can also connect to other enterprise applications such as facility management software, maintenance management systems, ERP or financial systems. New applications are also...

464

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

types is beyond the scope of this Web site. Instead, FEMP outlines major equipment types within chapter 9 of the FEMP O&M Best Practices Guide PDF . The FEMP O&M Best...

465

Independent Activity Report, Los Alamos Site Office - April 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 2012 April 2012 Independent Activity Report, Los Alamos Site Office - April 2012 April 2012 Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment [HIAR-LANL-2011-11-18] This activity report documents the results of the U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS) review of the Los Alamos Site Office (LASO) self-assessment of LASO's Nuclear Maintenance Management Program (NMMP) oversight program and activities. This self-assessment was led by the DOE LASO Facility Operations/Safety Engineering Team's (FO/SET) Nuclear Facility Maintenance Manager and was supported by a second member of the LASO FO/SET staff, an HSS subject matter expert, and a mechanical engineer from the National Nuclear Security

466

Structure-Based Mechanistic Insights into DNMT1-Mediated Maintenance DNA Methylation  

SciTech Connect

DNMT1, the major maintenance DNA methyltransferase in animals, helps to regulate gene expression, genome imprinting, and X-chromosome inactivation. We report on the crystal structure of a productive covalent mouse DNMT1(731-1602)-DNA complex containing a central hemimethylated CpG site. The methyl group of methylcytosine is positioned within a shallow hydrophobic concave surface, whereas the cytosine on the target strand is looped out and covalently anchored within the catalytic pocket. The DNA is distorted at the hemimethylated CpG step, with side chains from catalytic and recognition loops inserting through both grooves to fill an intercalation-type cavity associated with a dual base flip-out on partner strands. Structural and biochemical data establish how a combination of active and autoinhibitory mechanisms ensures the high fidelity of DNMT1-mediated maintenance DNA methylation.

Song, Jikui; Teplova, Marianna; Ishibe-Murakami, Satoko; Patel, Dinshaw J. (MSKCC)

2012-03-26T23:59:59.000Z

467

Critical Equipment Maintenance Using EPRI Preventive Maintenance Basis Database (PMBD) Recommendations for a Combustion Turbine Plan t  

Science Conference Proceedings (OSTI)

This technical update report covers specific component preventive maintenance strategies that were developed in cooperation with East Kentucky Power Cooperatives J.K. Smith plant personnel and EPRIs Generation Sector Fossil O&M group personnel. The EPRI Preventive Maintenance Basis Database (PMBD) 2.0 software tool was used to define preventive maintenance defense strategies for specific plant components. Many of the plant components were located in the balance-of-plant (BOP) areas at the station. The ma...

2009-11-06T23:59:59.000Z

468

Wind loading on solar concentrators: some general considerations  

DOE Green Energy (OSTI)

A survey has been completed to examine the problems and complications arising from wind loading on solar concentrators. Wind loading is site specific and has an important bearing on the design, cost, performance, operation and maintenance, safety, survival, and replacement of solar collecting systems. Emphasis herein is on paraboloidal, two-axis tracking systems. Thermal receiver problems also are discussed. Wind characteristics are discussed from a general point of view; current methods for determining design wind speed are reviewed. Aerodynamic coefficients are defined and illustrative examples are presented. Wind tunnel testing is discussed, and environmental wind tunnels are reviewed; recent results on heliostat arrays are reviewed as well. Aeroelasticity in relation to structural design is discussed briefly. Wind loads, i.e., forces and moments, are proportional to the square of the mean wind velocity. Forces are proportional to the square of concentrator diameter, and moments are proportional to the cube of diameter. Thus, wind loads have an important bearing on size selection from both cost and performance standpoints. It is concluded that sufficient information exists so that reasonably accurate predictions of wind loading are possible for a given paraboloidal concentrator configuration, provided that reliable and relevant wind conditions are specified. Such predictions will be useful to the design engineer and to the systems engineer as well. Information is lacking, however, on wind effects in field arrays of paraboloidal concentrators. Wind tunnel tests have been performed on model heliostat arrays, but there are important aerodynamic differences between heliostats and paraboloidal dishes.

Roschke, E. J.

1984-05-01T23:59:59.000Z

469

Nevada Test Site Environmental Report 2008 Attachment A: Site Description  

SciTech Connect

This attachment expands on the general description of the Nevada Test Site (NTS) presented in the Introduction to the Nevada Test Site Environmental Report 2008 (National Security Technologies, LLC [NSTec], 2009a). Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological setting. The cultural resources of the NTS are also presented. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NTS. An adequate knowledge of the site’s environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NTS. The NTS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NTS operations. These key features include the general remote location of the NTS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

Cathy A. Wills

2009-09-01T23:59:59.000Z

470

Site environmental report for 2002.  

SciTech Connect

Sandia National Laboratories, California (SNL/CA) is a government-owned/contractor-operated laboratory. Sandia Corporation, a Lockheed Martin Company, operates the laboratory for the Department of Energy's (DOE) National Nuclear Security Administration. The DOE, Sandia Site Office oversees operations at the site, using Sandia Corporation as a management and operating contractor. This Site Environmental Report for 2002 was prepared in accordance with DOE Order 231.1. The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2002. General site and environmental program information is also included.

Larsen, Barbara L.

2003-06-01T23:59:59.000Z

471

Nuclear Maintenance Applications Center: Air-Operated Valve Maintenance Guide: Revision 2  

Science Conference Proceedings (OSTI)

An increased awareness of the importance of air-operated valves (AOVs) has led to progressively more sophisticated maintenance practices within the nuclear industry. Nonnuclear plants are also heavily dependent on reliable AOV operation. The dynamic method used by fossil power plants to satisfy transient electrical demands places additional stress on plant components, including AOVs. Therefore, there is a growing need for standardized technical guidance related to AOVs. The Electric Power Research Instit...

2008-12-18T23:59:59.000Z

472

Generation Maintenance Application Center: Combined Cycle Combustion Turbine Attemperator Maintenance Guide  

Science Conference Proceedings (OSTI)

Combustion turbine combined-cycle (CTCC) facilities use various components that are unique to these types of power-generation plants. Therefore, use of the Electric Power Research Institute (EPRI) Preventive Maintenance Basis Database (1018758) by owners of CTCC facilities is limited to only those components that are common to both types of power plants and that have been previously added to the database. Because of the projected growth in the number of CTCC facilities, the EPRI Generation ...

2012-12-31T23:59:59.000Z

473

Generation Maintenance Application Center: Combustion Turbine Combined-Cycle Steam Valves Maintenance Guide  

Science Conference Proceedings (OSTI)

 BackgroundCombustion turbine combined-cycle (CTCC) facilities use various components that are unique to these types of power generation plants. Therefore, use of the Electric Power Research Institute (EPRI) Preventive Maintenance Basis Database (1018758) by owners of CTCC facilities is somewhat limited to only those components that are common to both CTCC facilities and nuclear or fossil power plants. With the projected growth in the number of CTCC facilities, the ...

2013-05-14T23:59:59.000Z

474

Generation Maintenance Applications Center: Combustion Turbine Combined-Cycle Duct Burner Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides component-level information regarding the maintenance of major components associated with the compressor section of a combustion turbine typically installed at a combined-cycle facility. It combines recommendations offered by major equipment manufacturers with lessons learned from owner/operators of combined-cycle facilities.  BackgroundCombustion turbine combined-cycle (CTCC) facilities utilize various components that are unique to ...

2013-11-15T23:59:59.000Z

475

Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.  

DOE Green Energy (OSTI)

This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific data recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of operating wind turbines. This report is intended to help develop a basic understanding of the data needed for reliability analysis from a Computerized Maintenance Management System (CMMS) and other data systems. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and analysis and reporting needs. The 'Motivation' section of this report provides a rationale for collecting and analyzing field data for reliability analysis. The benefits of this type of effort can include increased energy delivered, decreased operating costs, enhanced preventive maintenance schedules, solutions to issues with the largest payback, and identification of early failure indicators.

Peters, Valerie A.; Ogilvie, Alistair B.

2012-01-01T23:59:59.000Z

476

The Savannah River Site's Groundwater Monitoring Program  

Science Conference Proceedings (OSTI)

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the first quarter of 1990. It includes the analytical data, field data, well activity data, and the other documentation for this program and provides a record of the program's activities and rationale and an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of the analytical data and other data, maintenance of the databases containing groundwater monitoring data and related data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

Not Available

1990-10-18T23:59:59.000Z

477

Site C  

Office of Legacy Management (LM)

' ' u. s. A r my Corps or Engineers Kurfal.. Ilisfr ifl om« 1776 N1 . ~lI rll Sfred , lIu fflll" , New v ur k. 14207 Site C loseout Report for th e Ashland I (Includlng Seaway Arca D), Ashland 2 and Rattlesnake Creek FUS RAP Sites To nawanda . New Yor k F ina l - Octo ber 2006 Formerl y Ut ilized Sites Remedi al Actiun Program Dt:CLAlUlfiO lO OF RF ~ I'O""" A <:n o .. ('oMnLflOI'O '" 1 S-~1 1 A "n· nvnn: S Ill: C'lO'iU 'U l RtrUlIT f OR A SlIu x u l (I "ICLU I ING S t:A" ·,H A RU D j, AS H I .A ~O 2 A."n RAnU:M'AKf eRU" ~ rn~ I!d'on at A.hland 1 (Ind udonl Seaway Area DJ. Ashland 2 and kan~snak c Creek is Wi,...... 1c in acwr.hnu willi ~ Rcconl or Oecisim (ROD) . igned 00> April 20. 1998 and l'.1pbIWlOII <;If

478

DOE - Office of Legacy Management -- SiteA  

Office of Legacy Management (LM)

Illinois Illinois Site A/Plot M, Illinois, Decommissioned Reactor Site A D&D Program Site sitea_map As part of the DOE Defense Decontamination and Decommissioning (D&D) Program, the Office of Legacy Management manages the Site A/Plot M Decommissioned Reactor Site and ensures compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal DOE policies. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Site A/Plot M site, view the fact sheet. Site Documents and Links Contact Us Inspection/Sampling Schedule Site A/Plot M Decommissioned Reactor Mapping and Monitoring (GEMS)

479

DOE - Office of Legacy Management -- SiteA  

Office of Legacy Management (LM)

Illinois Illinois Site A/Plot M Decommissioned Reactor Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2013 Inspection and Annual Site Status Report for the Site A/Plot M, Cook County, Illinois Decontamination and Decommissioning Program Site Annual Monitoring Report Environmental Monitoring Program at Site A and Plot M, Palos Forest Preserve, Cook County, Illinois Long-Term Surveillance and Maintenance Plan for Site A/Plot M, Illinois,Decommissioned Reactor Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon

480

Nuclear Sites Map  

NLE Websites -- All DOE Office Websites (Extended Search)

reactor operations, nuclear research, weapons disassembly, maintenance and testing, hot cell operations, nuclear material storage and processing and waste disposal. Each...

Note: This page contains sample records for the topic "maintenance general site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Value-Based Maintenance Grid for Assessing Work Management  

Science Conference Proceedings (OSTI)

The Value-Based Maintenance Grid is a tool that assesses maintenance processes in fossil power plants. Reliability Management Group (RMG) and EPRI jointly developed the grid in 1995. It is based on RMG's Reliability Management Grid, a tool RMG has used successfully in other competitive industries such as manufacturing and refining.

1999-03-12T23:59:59.000Z

482

The Impact of Maintenance on Packaged Unitary Equipment  

Science Conference Proceedings (OSTI)

This report summarizes the findings of a two-year study of the energy and demand impacts of maintenance on rooftop packaged heating and cooling equipment. The purpose of the project was to determine if energy consumption and peak demand reductions could be reliably obtained through the implementation of proper maintenance on unitary packaged equipment in the three to ten ton range.

1997-05-29T23:59:59.000Z

483

Dynamic risks modelling in ERP maintenance projects with FCM  

Science Conference Proceedings (OSTI)

Firms adopting Enterprise Resource Planning (ERP) have to maintain their applications until the end of the system life span. Proper ERP maintenance is a condition that is necessary to achieve the benefits expected of these packages. However, too many ... Keywords: ERP maintenance, Enterprise system, Expert knowledge, Fuzzy cognitive map, Projects risk

Cristina Lopez, Jose L. Salmeron

2014-01-01T23:59:59.000Z

484

Multiversion Based View Maintenance Over Distributed Data Sources  

E-Print Network (OSTI)

. Categories and Subject Descriptors: H.2.4 [Database Management]: Systems--Distributed databases; Relational on Database Systems, Vol. x, No. x, 12 2004, Pages 0­30. #12;Multiversion Based View Maintenance over maintenance prototype system. Experiments comparing mainte- nance performance with and without TxnWrap enabled

485

Reliability Centered Maintenance (RCM) Technical Reference for Power Delivery  

Science Conference Proceedings (OSTI)

The overall goal of Reliability Centered Maintenance (RCM) is to improve the economic posture of a utility by promoting cost-effective application of maintenance resources. EPRI's RCM Technical Reference for Power Delivery provides utilities with essential technical data and guidance for conducting RCM studies of power delivery equipment and systems. It serves as the "handbook" of RCM for the utility power delivery sector.

1997-11-04T23:59:59.000Z

486

Maintenance and Application Guide for Control Relays and Timers  

Science Conference Proceedings (OSTI)

Reliable performance of control and timing relays is vital to the efficient operation of nuclear plants. This guide provides utilities practical, cost-effective methods for a control relay and timer maintenance program. It can help utilities optimize test and maintenance intervals while limiting expenditures.

1993-10-02T23:59:59.000Z

487

Hidden maintenance opportunities in discrete and complex production lines  

Science Conference Proceedings (OSTI)

In manufacturing systems, many maintenance tasks require equipment to be stopped in order to safely perform them. However, such stoppage cannot last for too long since it might directly result in short-term production losses. In this paper, we investigate ... Keywords: Complex manufacturing systems, Discrete production, Maintenance opportunity windows

Xi Gu; Seungchul Lee; Xinran Liang; Mark Garcellano; Mark Diederichs; Jun Ni

2013-09-01T23:59:59.000Z

488

Maintenance Work Management Improvement: Improving Culture and Work Process  

Science Conference Proceedings (OSTI)

EPRI's Plant Maintenance Optimization (PMO) mission is to develop and demonstrate products and services for improved use of power plant maintenance resources and increased profitability. Based on a series of work management improvement projects, EPRI plans to develop a best practices guideline. As part of this effort, this document details how to improve fossil power plant work culture and work processes.

1998-06-16T23:59:59.000Z

489

Strategic Capacity Axial-Compressor Maintenance Program (SCAMP) Version 2  

Science Conference Proceedings (OSTI)

The Strategic Capacity Axial-Compressor Maintenance Program (SCAMP) spreadsheet provides combustion turbine operators with a low-cost, easy-to-install, easy-to-use program for monitoring combustion turbine (CT) axial compressor performance. Utilities can use it to diagnose the condition of axial compressors and to determine the benefits of maintenance actions such as an off-line compressor wash.

2000-11-29T23:59:59.000Z

490

Information analysis of rail track for predictive maintenance  

Science Conference Proceedings (OSTI)

Track defects are deviation of actual from theoretical values of the tracks geometrical characteristics. Track defects are macroscopic and geometric in nature and are exclusively the consequence of train traffic. [5] Rail track maintenance in terms of ... Keywords: CURV, cant def, cross level, dipped left, gauge, predictive maintenance management, rail track geometry

R. B. Faiz; S. Singh

2009-07-01T23:59:59.000Z

491

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1.1 1.1 Chapter 11 Ten Steps to Operational Efficiency Step 1: Strive to increase management awareness and appreciation of the operations and maintenance program/department. * Consider developing a maintenance mission statement and requesting/requiring management sign-off. * Consider developing a maintenance plan and requesting/requiring management sign-off. * Begin the development of the OMETA linkages. - Develop key points of contact within other departments that can participate in the O&M mission. Step 2: Commit to begin tracking Operations and Maintenance activities. * Need to understand where O&M time is spent. * Need to understand where O&M dollars are spent. * Consider (strongly) purchasing or enhancing a Computerized Maintenance Management

492

Operations and Maintenance Best Practices Guide | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide October 7, 2013 - 9:56am Addthis The Federal Energy Management Program's Operations and Maintenance (O&M) Best Practices Guide outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Following these best practices can help agencies gain management buy-in for O&M programs and save an estimated 5% to 20% on energy bills without a significant capital investment. Depending on the facility, these savings can represent thousands to hundreds-of-thousands of dollars each year. Read the Operations and Maintenance (O&M) Best Practices Guide: Release 3.0. See individual chapters: Front Matter

493

Protocol, Development and Maintenance of Criteria and Review Approach  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development and Maintenance of Criteria and Review Development and Maintenance of Criteria and Review Approach Documents - July 2013 Protocol, Development and Maintenance of Criteria and Review Approach Documents - July 2013 July 2013 Protocol for the Development and Maintenance of Criteria and Review Approach Documents The purpose of this protocol is to establish the requirements and responsibilities for the development and maintenance of Criteria and Review Approach Documents (CRADs) used by the Office of Safety and Emergency Management Evaluations (HS-45). The HS-45 CRADS are carefully selected, modified (if required), and referenced in HS-45 appraisal plans. These plans are used to provide an outline of the activities planned to assess the effectiveness of safety and emergency management processes and

494

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Why O&M? 2 Why O&M? � 2.1 Introduction Effective O&M is one of the most cost-effective methods for ensuring reliability, safety, and energy efficiency. Inadequate maintenance of energy-using systems is a major cause of energy waste in both the Federal Government and the private sector. Energy losses from steam, water and air leaks, uninsulated lines, maladjusted or inoperable controls, and other losses from poor maintenance are often considerable. Good maintenance practices can generate substantial energy savings and should be considered a resource. Moreover, improvements to facility maintenance programs can often be accomplished immediately and at a relatively low cost. 2.2 Definitions Operations and Maintenance are the decisions and actions regarding the control and upkeep of

495

Operations and Maintenance Program Structure | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Program Structure Operations and Maintenance Program Structure Operations and Maintenance Program Structure October 4, 2013 - 5:12pm Addthis The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and administration. This approach is commonly referred to as the OMETA principle. Common roles and responsibilities for each function within the OMETA principle are outlined below. Operations The operations function of the O&M program covers the following responsibilities: Administration: Responsible for ensuring effective implementation and control of O&M activities Conduct of Operations: Responsible for ensuring efficient, safe, and reliable process operations across the O&M program

496

Do-It-Now building maintenance reengineering project  

Science Conference Proceedings (OSTI)

The Do-It-Now (DIN) building maintenance system is proposed to reduce the cost of routine building maintenance and repairs and to improve customer satisfaction with maintenance services. DIN uses a team approach to periodically inspect buildings and provide maintenance services on the spot. It emphasizes communications between the customers and the craftspeople performing the work. The system was designed using a reengineering approach that characterized the existing maintenance work control system, analyzed comparable systems in other DOE laboratories, envisioned an ideal system, and proposed a workable, testable system for initial implementation. At each stage, input was solicited from customer representatives and Facilities management to ensure meeting customer requirements with an implementable system.

Apoddaca, L.; Ayotte, A.; Coffman, J.; Dukes, L.; Jojola, S.; Kadlec, J.; Letourneau, S.; Matthews, R.; Paul, G.

1996-09-01T23:59:59.000Z

497

Plant maintenance and advanced reactors issue, 2008  

Science Conference Proceedings (OSTI)

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.

Agnihotri, Newal (ed.)

2009-09-15T23:59:59.000Z

498

Site Resources, Facilities & Operations Directorate, Brookhaven National  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Resources Division Site Resources Division Homepage The mission of the Site Resources Division is to enhance the site aesthetic so as to improve staff recruitment and retention, safety, and customer satisfaction, and to support the overall Laboratory mission. To that end, we are dedicated to providing services to the Laboratory at the highest standard per science dollar. The Site Resources Division is responsible for the following: Custodial Services BNL Recycling Program Sanitation Grounds Maintenance, including limited herbicide applications Masonry Operation and maintenance of light and heavy machine equipment, including elevators and emergency generators Rigging & Hoisting Pest control Clean-up of outdoor and select indoor spills Top of Page Last Modified: February 28, 2011

499

Portsmouth Site Feeds Bacteria to Render Hazardous Groundwater Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth Site Feeds Bacteria to Render Hazardous Groundwater Portsmouth Site Feeds Bacteria to Render Hazardous Groundwater Waste Harmless Portsmouth Site Feeds Bacteria to Render Hazardous Groundwater Waste Harmless April 2, 2012 - 12:00pm Addthis Neil Smith puts a trained eye on the pressure and flow of a food-grade com¬pound being injected into an under¬ground plume of hazardous waste near the X-720 Maintenance Facility at the DOE Piketon Site. The sodium lactate compound promotes bacterial growth in the groundwater that turns hazardous waste into harmless end-products. Neil Smith puts a trained eye on the pressure and flow of a food-grade com¬pound being injected into an under¬ground plume of hazardous waste near the X-720 Maintenance Facility at the DOE Piketon Site. The sodium lactate compound promotes bacterial growth in the groundwater that turns

500

Nevada Test Site Environmental Report 2005, Attachment A - Site Description  

SciTech Connect

This appendix to the ''Nevada Test Site Environmental Report 2005'', dated October 2006 (DOE/NV/11718--1214; DOE/NV/25946--007) expands on the general description of the Nevada Test Site (NTS) presented in the Introduction. Included are subsections that summarize the site?s geological, hydrological, climatological, and ecological setting. The cultural resources of the NTS are also presented. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NTS. An adequate knowledge of the site's environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NTS. The NTS environment contributes to several key features of the site which afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NTS operations. These key features include the general remote location of the NTS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This appendix complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

Cathy A. Wills

2006-10-01T23:59:59.000Z