Powered by Deep Web Technologies
Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Method for including operation and maintenance costs in the economic analysis of active solar energy systems  

DOE Green Energy (OSTI)

For a developing technology such as solar energy, the costs for operation and maintenance (O and M) can be substantial. In the past, most economic analyses included these costs by simply assuming that an annual cost will be incurred that is proportional to the initial cost of the system. However, in assessing the economics of new systems proposed for further research and development, such a simplification can obscure the issues. For example, when the typical method for including O and M costs in an economic analysis is used, the O and M costs associated with a newly developed, more reliable, and slightly more expensive controller will be assumed to increase - an obvious inconsistency. The method presented in this report replaces this simplistic approach with a representation of the O and M costs that explicitly accounts for the uncertainties and risks inherent in the operation of any equipment. A detailed description of the data inputs required by the method is included as well as a summary of data sources and an example of the method as applied to an active solar heating system.

Short, W.D.

1986-08-01T23:59:59.000Z

2

UW Madison Fleet Fiscal Year 2010 Rates: Fuel, maintenance and insurance costs are included. If fuel prices exceed the budgeted  

E-Print Network (OSTI)

UW Madison Fleet Fiscal Year 2010 Rates: Fuel, maintenance and insurance costs are included. If fuel prices exceed the budgeted amount by a significant margin, the rates will be amended with a fuel surcharge at that time and the change notice will be posted in the fleet web site, rates page. Some rate

Sheridan, Jennifer

3

Maintenance cost studies of present aircraft subsystems  

E-Print Network (OSTI)

This report describes two detailed studies of actual maintenance costs for present transport aircraft. The first part describes maintenance costs for jet transport aircraft broken down into subsystem costs according to an ...

Pearlman, Chaim Herman Shalom

1966-01-01T23:59:59.000Z

4

Comparing maintenance costs of geothermal heat pump systems with other HVAC systems: Preventive maintenance actions and total maintenance costs  

SciTech Connect

Total annual heating, ventilating, and air-conditioning (HVAC) maintenance costs were determined for 20 schools in the Lincoln, Nebraska, Public School District. Each school examined provides cooling to over 70% of its total floor area and relies on one of the following heating and cooling systems to provide the majority of space conditioning: vertical-bore, geothermal heat pumps (GHPs), air-cooled chiller with gas-fired hot water boiler (ACC/GHWB), or water-cooled chiller with gas-fired steam boiler (WCC/GSB). A precursor to this study examined annual costs associated with repair, service, and corrective maintenance activities tracked in a work order database. This follow-up study examines costs associated with preventive maintenance (PM) activities conducted by the district. Annual PM costs were 5.87 {cents}/yr-ft{sup 2} (63.14 {cents}/yr-m{sup 2}) for ACC/GHWB schools, followed by 7.14 {cents}/yr-ft{sup 2} (76.86 {cents}/yr-m{sup 2}) for GHP, 9.82 {cents}/yr-ft{sup 2} (105.39 {cents}/yr-m{sup 2}) for WCC/ GSB, and 12.65 {cents}/yr-ft{sup 2} (136.30 {cents}/yr-m{sup 2}) for WCC/GHWB. The results of the two analyses are combined to produce an estimate of total annual maintenance costs, by system type, for the 20 schools. Total annual maintenance costs were 8.75 {cents}/yr-ft{sup 2} (94.20 {cents}/yr-m{sup 2}) for ACC/GHWB schools, followed by 9.27 {cents}/yr-ft{sup 2} (99.76 {cents}/yr-m{sup 2}) for GHP, 13.54 {cents}/yr-ft{sup 2} (145.49 {cents}/yr-m{sup 2}) for WCC/GSB, and 18.71 {cents}/yr-ft{sup 2} (201.61 {cents}/yr-m{sup 2}) for WCC/GHWB. It should be noted that these costs represent only the trends seen in the maintenance database of the Lincoln School District. Because of differences in the number of schools using each system type, varying equipment age, and the small total number of schools included in the study, the maintenance costs presented here may not be representative of the maintenance costs seen for similar equipment in other locations.

Martin, M.A.; Madgett, M.G.; Hughes, P.J.

2000-07-01T23:59:59.000Z

5

Simple Maintenance Saves Costly Furnace Repair/Replacement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement January 6, 2010 - 8:26am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the controls to provide optimum water and air temperature settings for both efficiency and comfort Having a technician perform a combustion-efficiency test Checking the combustion chamber for cracks. Testing for carbon monoxide

6

Installation, Operation, and Maintenance Costs for Distributed Generation Technologies  

Science Conference Proceedings (OSTI)

Distributed generation (DG) is a broad term that encompasses both mature and emerging onsite power generation technologies with power output as small as 1 kW and as large as 20 MW. While the equipment or purchase cost of a DG system is very important, installation, operation, and maintenance (IOM) costs also are significant and often overlooked. This report reviews IOM costs for both mature and emerging DG technologies. Some equipment cost data is included for reference, but is not the focus of this repo...

2003-02-03T23:59:59.000Z

7

Energy and Maintenance Cost Savings Review at Several US ...  

Science Conference Proceedings (OSTI)

Presentation Title, Energy and Maintenance Cost Savings Review at Several US ... Weight-Time Curves Generated with the PoDFA / Prefil® Footprinter Method.

8

Update on maintenance and service costs of commercial building ground-source heat pump systems  

Science Conference Proceedings (OSTI)

An earlier paper showed that commercial ground-source heat pump systems have significantly lower service and maintenance costs than alternative HVAC systems. This paper expands on those results by adding 13 more buildings to the original 25 sites and by comparing the results to the latest ASHRAE survey of HVAC maintenance costs. Data from the 38 sites are presented here including total (scheduled and unscheduled) maintenance costs in cents per square foot per year for base cost, in-house, and contractor-provided maintenance. Because some of the new sites had maintenance costs that were much higher than the industry norm, the resulting data are not normally distributed. Analysis (O'Hara Hines 1998) indicated that a log-normal distribution is a better fit; thus, the data are analyzed and presented here as log-normal. The log-mean annual total maintenance costs for the most recent year of the survey ranged from 6.07 cents per square foot to 8.37 cents per square foot for base cost and contractor-provided maintenance, respectively.

Cane, D.; Garnet, J.M.

2000-07-01T23:59:59.000Z

9

Including costs of supply chain risk in strategic sourcing decisions  

E-Print Network (OSTI)

Cost evaluations do not always include the costs associated with risks when organizations make strategic sourcing decisions. This research was conducted to establish and quantify the impact of risks and risk-related costs ...

Jain, Avani

2009-01-01T23:59:59.000Z

10

Maintenance  

Science Conference Proceedings (OSTI)

Higher oil and labour costs, plus low quality fuel, demand that management takes a closer look at diesel engine lubrication. Problems of corrosion due to sulphur containing acids, oil analysis in order that it can be changed when necessary, filter analysis, use of multi-viscosity oil, and storage of oils are considered. A comprehensive lubricant conservation programme can reduce maintenance, labour costs and equipment downtime. Cleaning and replacement of bearings are discussed. Managing tire costs is also described.

Not Available

1981-06-01T23:59:59.000Z

11

Definition: Reduced T&D Equipment Maintenance Cost | Open Energy  

Open Energy Info (EERE)

T&D Equipment Maintenance Cost T&D Equipment Maintenance Cost Jump to: navigation, search Dictionary.png Reduced T&D Equipment Maintenance Cost The cost of sending technicians into the field to check equipment condition is high. Moreover, to ensure that they maintain equipment sufficiently, and identify failure precursors, some utilities may conduct equipment testing and maintenance more often than is necessary. Online diagnosis and reporting of equipment condition would reduce or eliminate the need to send people out to check equipment resulting in a cost savings.[1] References ↑ SmartGrid.gov 'Description of Benefits' An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Reduced_T%26D_Equipment_Maintenance_Cost&oldid=417296"

12

Operation and maintenance cost data for residential photovoltaic modules/panels  

DOE Green Energy (OSTI)

Burt Hill Kosar Rittelmann Associates has conducted a study to identify and estimate costs associated with the operation and maintenance of residential photovoltaic modules and arrays. Six basic topics related to operation and maintenance to photovoltaic arrays were investigated - General (Normal) Maintenance, Cleaning, Panel Replacement, Gasket Repair/Replacement, Wiring Repair/Replacement, and Termination Repair/Replacement. The effects of the mounting types - Rack Mount, Stand-Off Mount, Direct Mount, and Integral Mount - and the installation/replacement type - Sequential, Partial Interruption, and Independent - have been identified and described. Recommendation on methods of reducing maintenance costs are made.

None

1980-07-01T23:59:59.000Z

13

Investigation of the Integration of Interstitial Building Spaces on Costs and Time of Facility Maintenance for U.S. Army Hospitals  

E-Print Network (OSTI)

The U.S. Army Medical Department (AMEDD) has used the interstitial building system (IBS) as a design component for some of the hospitals in its healthcare infrastructure portfolio. Department of Defense (DoD) leadership is aware of increases in healthcare costs and understands the importance of safely reducing costs, which may be possible through design initiatives. An analysis was performed on facility maintenance metrics for ten different U.S. Army hospitals, including IBS design and conventional / non-interstitial building system (NIBS) design. Statistical analysis indicated a significant difference in cost and time data between IBS and NIBS for most of the building systems considered (HVAC, electrical, plumbing, and interior). Scheduled maintenance for the plumbing building system was not found to have a significant difference in costs; scheduled maintenance for the HVAC and plumbing building system was not found to have a significant difference in time expended. The data in this study showed that facility maintenance cost and time were generally lower for IBS than NIBS. Time spent (and associated cost) for scheduled maintenance of the electrical and plumbing building systems were slightly higher in IBS, though not significantly higher for plumbing. It may be easier to reach the plumbing and electrical building systems due to the greater accessibility afforded by IBS design. While a cost premium is estimated for integrating IBS design, the savings provided by life cycle facility maintenance is estimated to be up to three and a half times the initial cost premium.

Leveridge, Autumn Tamara

2013-05-01T23:59:59.000Z

14

Combustion Turbine/Combined-Cycle Operations and Maintenance Cost Analyzer, Version 8.61  

Science Conference Proceedings (OSTI)

The CTCC O&M Cost Analyzer is a spreadsheet software product that estimates operations and maintenance (O&M) costs for combustion turbine and combined-cycle plants for specific gas turbine models over the operating life of the asset The CTCC O&M Cost Analyzer software contains powerful capabilities to assist users in evaluating non-fuel O&M costs and in supporting a life-cycle cost evaluation perspective.  The software uses a "bottoms-up" approach for ...

2013-05-06T23:59:59.000Z

15

Stochastic Modeling of Future Highway Maintenance Costs for Flexible Type Highway Pavement Construction Projects  

E-Print Network (OSTI)

The transportation infrastructure systems in the United States were built between the 50's and 80's, with 20 years design life. As most of them already exceeded their original life expectancy, state transportation agencies (STAs) are now under increased needs to rebuild deteriorated transportation networks. For major highway maintenance projects, a federal rule enforces to perform a life-cycle cost analysis (LCCA). The lack of analytical methods for LCCA creates many challenges of STAs to comply with the rule. To address these critical issues, this study aims at developing a new methodology for quantifying the future maintenance cost to assist STAs in performing a LCCA. The major objectives of this research are twofold: 1) identify the critical factors that affect pavement performances; 2) develop a stochastic model that predicts future maintenance costs of flexible-type pavement in Texas. The study data were gathered through the Pavement Management Information System (PMIS) containing more than 190,000 highway sections in Texas. These data were then grouped by critical performance-driven factor which was identified by K-means cluster analysis. Many factors were evaluated to identify the most critical factors that affect pavement maintenance need. With these data, a series of regression analyses were carried out to develop predictive models. Lastly, a validation study with PRESS statistics was conducted to evaluate reliability of the model. The research results reveal that three factors, annual average temperature, annual precipitation, and pavement age, were the most critical factors under very low traffic volume conditions. This research effort was the first of its kind undertaken in this subject. The maintenance cost lookup tables and stochastic model will assist STAs in carrying out a LCCA, with the reliable estimation of maintenance costs. This research also provides the research community with the first view and systematic estimation method that STAs can use to determine long-term maintenance costs in estimating life-cycle costs. It will reduce the agency's expenses in the time and effort required for conducting a LCCA. Estimating long-term maintenance cost is a core component of the LCCA. Therefore, methods developed from this project have the great potential to improve the accuracy of LCCA.

Kim, Yoo Hyun

2012-05-01T23:59:59.000Z

16

THE COST OF MAINTENANCE TRANSFER UNDER LOAD TAP OF THE TRANSFORMERS POWER OF EXTRA HIGH VOLTAGE THE ELETRONORTE.  

E-Print Network (OSTI)

??In this work a methodology for reduction of maintenance cost in the on-load tap changers (OLTC) of extra high voltage is proposed. The methodology is… (more)

RAIMUNDO NONATO ROSA FILHO

2005-01-01T23:59:59.000Z

17

Reducing Operations and Maintenance Costs of Nuclear Power Plant Fire Protection Programs  

Science Conference Proceedings (OSTI)

This report discusses opportunities for utilities to reduce fire protection operations and maintenance (O&M) costs. A number of these opportunities have been implemented by some utilities and can be implemented now by others. Other opportunities can be implemented in the short term with some additional development. These other opportunities are amenable to cooperative projects with costs shared by multiple utilities. There is also a group of opportunities that are probably best developed on an industry w...

1997-01-08T23:59:59.000Z

18

Development of an Operations and Maintenance Cost Model to Identify Cost of Energy Savings for Low Wind Speed Turbines: July 2, 2004 -- June 30, 2008  

SciTech Connect

The report describes the operatons and maintenance cost model developed by Global Energy Concepts under contract to NREL to estimate the O&M costs for commercial wind turbine generator facilities.

Poore, R.

2008-01-01T23:59:59.000Z

19

Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy  

DOE Green Energy (OSTI)

Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

Maples, B.; Saur, G.; Hand, M.; van de Pieterman, R.; Obdam, T.

2013-07-01T23:59:59.000Z

20

Wind turbine reliability : understanding and minimizing wind turbine operation and maintenance costs.  

SciTech Connect

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. Cost of energy (COE) is a key project evaluation metric, both in commercial applications and in the U.S. federal wind energy program. To reflect this commercial reality, the wind energy research community has adopted COE as a decision-making and technology evaluation metric. The COE metric accounts for the effects of reliability through levelized replacement cost and unscheduled maintenance cost parameters. However, unlike the other cost contributors, such as initial capital investment and scheduled maintenance and operating expenses, costs associated with component failures are necessarily speculative. They are based on assumptions about the reliability of components that in many cases have not been operated for a complete life cycle. Due to the logistical and practical difficulty of replacing major components in a wind turbine, unanticipated failures (especially serial failures) can have a large impact on the economics of a project. The uncertainty associated with long-term component reliability has direct bearing on the confidence level associated with COE projections. In addition, wind turbine technology is evolving. New materials and designs are being incorporated in contemporary wind turbines with the ultimate goal of reducing weight, controlling loads, and improving energy capture. While the goal of these innovations is reduction in the COE, there is a potential impact on reliability whenever new technologies are introduced. While some of these innovations may ultimately improve reliability, in the short term, the technology risks and the perception of risk will increase. The COE metric used by researchers to evaluate technologies does not address this issue. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce COE.

2004-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Wind turbine reliability : understanding and minimizing wind turbine operation and maintenance costs.  

DOE Green Energy (OSTI)

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. Cost of energy (COE) is a key project evaluation metric, both in commercial applications and in the U.S. federal wind energy program. To reflect this commercial reality, the wind energy research community has adopted COE as a decision-making and technology evaluation metric. The COE metric accounts for the effects of reliability through levelized replacement cost and unscheduled maintenance cost parameters. However, unlike the other cost contributors, such as initial capital investment and scheduled maintenance and operating expenses, costs associated with component failures are necessarily speculative. They are based on assumptions about the reliability of components that in many cases have not been operated for a complete life cycle. Due to the logistical and practical difficulty of replacing major components in a wind turbine, unanticipated failures (especially serial failures) can have a large impact on the economics of a project. The uncertainty associated with long-term component reliability has direct bearing on the confidence level associated with COE projections. In addition, wind turbine technology is evolving. New materials and designs are being incorporated in contemporary wind turbines with the ultimate goal of reducing weight, controlling loads, and improving energy capture. While the goal of these innovations is reduction in the COE, there is a potential impact on reliability whenever new technologies are introduced. While some of these innovations may ultimately improve reliability, in the short term, the technology risks and the perception of risk will increase. The COE metric used by researchers to evaluate technologies does not address this issue. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce COE.

Not Available

2004-11-01T23:59:59.000Z

22

Equipment Maintenance Optimization Manual Prototypes  

Science Conference Proceedings (OSTI)

This report provides detailed information to assist plant staff in performing recommended equipment maintenance tasks. It is a compilation of equipment maintenance optimization manual (EMOM) prototypes that include procedures and trouble shooting supported by broad-based utility experience. The EMOMs enable utility generation stations to: minimize operation and maintenance costs, including parts and labor; assist in maintenance planning, scheduling, and parts strategy; develop comprehensive maintenance m...

1999-11-24T23:59:59.000Z

23

Nuclear Maintenance Applications Center: Motor Management Guide Supporting Plant License Renewal Including Environmental Qualification Considerations  

Science Conference Proceedings (OSTI)

This report was developed by the Electric Power Research Institute’s Large Electric Motor Users Group Information Working Group, which includes motor engineers, motor specialist consultants, and vendors. Environmental qualification (EQ) program owners were also involved in the development of this report. This report addresses the most important elements of a sound motor management program to support an informed decision on motor preservation and motor life extension. Motor life extensions of ...

2013-06-07T23:59:59.000Z

24

Wind turbine reliability :understanding and minimizing wind turbine operation and maintenance costs.  

DOE Green Energy (OSTI)

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce cost of energy.

Walford, Christopher A. (Global Energy Concepts. Kirkland, WA)

2006-03-01T23:59:59.000Z

25

Wind turbine reliability :understanding and minimizing wind turbine operation and maintenance costs.  

SciTech Connect

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce cost of energy.

Walford, Christopher A. (Global Energy Concepts. Kirkland, WA)

2006-03-01T23:59:59.000Z

26

Comparing Maintenance Costs of Geothermal Heat Pump Systems with other HVAC Systems in Lincoln Public Schools: Repair, Service, and Corrective Actions  

DOE Green Energy (OSTI)

The Lincoln Public School District, in Lincoln, Nebraska, recently installed vertical-bore geothermal heat pump systems in four, new, elementary schools. Because the district has consistent maintenance records and procedures, it was possible to study repair, service and corrective maintenance requests for 20 schools in the district. Each school studied provides cooling to over 70% of its total floor area and uses one of the following heating and cooling systems: vertical-bore geothermal heat pumps (GHPs), air-cooled chiller with gas-fired hot water boiler (ACUGHWB), water-cooled chiller with gas-fired hot water boiler (WCCYGHWB), or water-cooled chiller with gas-fired steam boiler (WCUGSB). Preventative maintenance and capital renewal activities were not included in the available database. GHP schools reported average total costs at 2.13 cents/ft{sup 2}-yr, followed by ACC/GHWB schools at 2.88 cents/ft{sup 2}-yr, WCC/GSB schools at 3.73 cents/ft{sup 2}-yr, and WCC/GHWB schools at 6.07 cents/ft{sup 2}-yr. Because of tax-exemptions on material purchases, a reliance on in-house labor, and the absence of preventative maintenance records in the database, these costs are lower than those reported in previous studies. A strong relationship (R{sup 2}=O.52) was found between costs examined and cooling system age: the newer the cooling equipment, the less it costs to maintain.

Martin, M.A.; Durfee, D.J.; Hughes, P.J.

1999-06-19T23:59:59.000Z

27

SOLERAS - Solar-Powered Water Desalination Project at Yanbu: Forecasting models for operating and maintenance cost of the pilot plant  

Science Conference Proceedings (OSTI)

This study was conducted in cooperation with the Department of Industrial Engineering of King Abdulaziz University. The main objective of this study is to meet some of the goals of the Solar Energy Water Desalination Plant (SEWDP) plan in the area of economic evaluation. The first part of this project focused on describing the existing trend in the operation and maintenance (OandM) cost for the SOLERAS Solar Energy Water Desalination Plant in Yanbu. The second part used the information obtained on existing trends to find suitable forecasting models. These models, which are found here, are sensitive to changes in costs trends. Nevertheless, the study presented here has established the foundation for (OandM) costs estimating in the plant. The methodologies used in this study should continue as more data on operation and maintenance costs become available, because, in the long run, the trend in costs will help determine where cost effectiveness might be improved. 7 refs., 24 figs., 15 tabs.

Al-Idrisi, M.; Hamad, G.

1987-04-01T23:59:59.000Z

28

Include in Column B cost of all composition produced by plant. Include in Column C cost of all operations not involving printing (Col. A)  

E-Print Network (OSTI)

occupied (whether Government-owned or rented), utilities, etc. (14.5 cents per month per square foot. Amount spent for rental of equipment Total cost (Use col.A total from this line to compute cost per 1 units produced in plant this fiscal quarter Total units produced in plant this fiscal year Cost per 1

US Army Corps of Engineers

29

Cost and cost-effectiveness of standard methadone maintenance treatment compared to enriched 180-day methadone detoxification.  

E-Print Network (OSTI)

Theoretical foundations of cost-effectiveness analysis, in:B. & Weinstein, M. C. (Eds) Cost-effectiveness in health andK. L. & Hall, S. M. (1999) A cost-effectiveness and cost-

2004-01-01T23:59:59.000Z

30

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

31

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections-2012  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.BackgroundAs a focus of innovative approaches and techniques, maintenance of aging steam ...

2012-12-12T23:59:59.000Z

32

Comparing maintenance costs of geothermal heat pump systems with other HVAC systems in Lincoln public schools: Repair, service, and corrective actions  

SciTech Connect

The Lincoln Public School District, in Lincoln, Nebraska, recently installed vertical-bore geothermal heat pump systems in four new elementary schools. Because the district has consistent maintenance records and procedures, it was possible to study repair, service, and corrective maintenance requests for 20 schools in the district. Each school studied provides cooling to over 70% of its total floor area and uses one of the following heating and cooling systems: vertical-bore geothermal heat pumps (GHPs), air-cooled chiller with gas-fired hot water boiler (ACC/GHWB), water-cooled chiller with gas-fired hot water boiler (WCC/GHWB), or water-cooled chiller with gas-fired steam boiler (WCC/GSB). Preventative maintenance and capital renewal activities were not included in the available database. GHP schools reported average total costs at 2.13{cents}/ft{sup 2}-yr, followed by ACC/GHWB schools at 2.884{cents}/ft{sup 2}-yr, WCC/GSB schools at 3.73{cents}/ft{sup 2}-yr, and WCC/GHWB schools at 6.07{cents}/ft{sup 2}-yr. Because of tax exemptions on material purchases, a reliance on in-house labor, and the absence of preventative maintenance records in the database, these costs are lower than those reported in previous studies. A strong relationship (R{sup 2} = 0.52) was found between costs examined and cooling system age: the newer the cooling equipment, the less it costs to maintain.

Martin, M.A.; Durfee, D.J.; Hughes, P.J.

1999-07-01T23:59:59.000Z

33

Applying environmental externalities to US Clean Coal Technologies for Asia. [Including external environmental costs  

SciTech Connect

The United States is well positioned to play an expanding role in meeting the energy technology demands of the Asian Pacific Basin, including Indonesia, Thailand, and the Republic of China (ROC-Taiwan). The US Department of Energy Clean Coal Technology (CCT) Demonstration Program provides a proving ground for innovative coal-related technologies that can be applied domestically and abroad. These innovative US CCTs are expected to satisfy increasingly stringent environmental requirements while substantially improving power generation efficiencies. They should also provide distinct advantages over conventional pulverized coal-fired combustors. Finally, they are expected to be competitive with other energy options currently being considered in the region. This paper presents potential technology scenarios for Indonesia, Thailand, and the ROC-Taiwan and considers an environmental cost-benefit approach employing a newly developed method of applying environmental externalities. Results suggest that the economic benefits from increased emission control can indeed be quantified and used in cost-benefit comparisons, and that US CCTs can be very cost effective in reducing emissions.

Szpunar, C.B.; Gillette, J.L.

1993-01-01T23:59:59.000Z

34

An analysis of the impacts of economic incentive programs on commercial nuclear power plant operations and maintenance costs  

SciTech Connect

Operations and Maintenance (O and M) expenditures by nuclear power plant owner/operators possess a very logical and vital link in considerations relating to plant safety and reliability. Since the determinants of O and M outlays are considerable and varied, the potential linkages to plant safety, both directly and indirectly, can likewise be substantial. One significant issue before the US Nuclear Regulatory Commission is the impact, if any, on O and M spending from state programs that attempt to improve plant operating performance, and how and to what extent these programs may affect plant safety and pose public health risks. The purpose of this study is to examine the role and degree of impacts from state promulgated economic incentive programs (EIPs) on plant O and M spending. A multivariate regression framework is specified, and the model is estimated on industry data over a five-year period, 1986--1990. Explanatory variables for the O and M spending model include plant characteristics, regulatory effects, financial strength factors, replacement power costs, and the performance incentive programs. EIPs are found to have statistically significant effects on plant O and M outlays, albeit small in relation to other factors. Moreover, the results indicate that the relatively financially weaker firms are more sensitive in their O and M spending to the presence of such programs. Formulations for linking spending behavior and EIPs with plant safety performance remains for future analysis.

Kavanaugh, D.C.; Monroe, W.H. [Pacific Northwest Lab., Richland, WA (United States); Wood, R.S. [Nuclear Regulatory Commission, Washington, DC (United States)

1996-02-01T23:59:59.000Z

35

Ash Handling System Maintenance Guide  

Science Conference Proceedings (OSTI)

This Ash Handling System Maintenance Guide provides fossil plant maintenance personnel with current maintenance information on this system. This guide will assist plant maintenance personnel in improving the reliability and reducing the maintenance costs for the ash handling system.

2005-12-23T23:59:59.000Z

36

Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011  

DOE Green Energy (OSTI)

DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

2012-01-01T23:59:59.000Z

37

A Winter Weather Index for Estimating Winter Roadway Maintenance Costs in the Midwest  

Science Conference Proceedings (OSTI)

Winter roadway maintenance budget data for the state of Iowa have been combined with available climate data for a 6-yr period to create a winter weather index that provides a useful assessment of winter severity. The weather index can be combined ...

Craig G. Carmichael; William A. Gallus Jr.; Bradley R. Temeyer; Mark K. Bryden

2004-11-01T23:59:59.000Z

38

HEV Fleet Testing Maintenance Sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

Bicyclist rams vehicle denting hood. Damage not repaired. (not included in maintenance costs) ---- 10292002 9,594 Oil change 20.67 1242003 12,953 Oil change 20.67 623...

39

Dynamic life-cycle costing in asset management of production equipments with emphasis om maintenance.  

E-Print Network (OSTI)

?? In the contemporary industry, companies need to make investments to grow their business volume. However each investment comes with its own risk. Cost of… (more)

Chaudhary, Osman

2011-01-01T23:59:59.000Z

40

Substation Reliability Centered Maintenance  

SciTech Connect

Substation Reliability Centered Maintenance (RCM) is a technique that is used to develop maintenance plans and criteria so the operational capability of substation equipment is achieved, restored, or maintained. The objective of the RCM process is to focus attention on system equipment in a manner that leads to the formulation of an optimal maintenance plan. The RCM concept originated in the airline industry in the 1970s and has been used since 1985 to establish maintenance requirements for nuclear power plants. The RCM process is initially applied during the design and development phase of equipment or systems on the premise that reliability is a design characteristic. It is then reapplied, as necessary, during the operational phase to sustain a more optimal maintenance program based on actual field experiences. The purpose of the RCM process is to develop a maintenance program that provides desired or specified levels of operational safety and reliability at the lowest possible overall cost. The objectives are to predict or detect and correct incipient failures before they occur or before they develop into major defects, reduce the probability of failure, detect hidden problems, and improve the cost-effectiveness of the maintenance program. RCM accomplishes two basic purposes: (1) It identifies in real-time incipient equipment problems, averting potentially expensive catastrophic failures by communicating potential problems to appropriate system operators and maintenance personnel. (2) It provides decision support by recommending, identifying, and scheduling preventive maintenance. Recommendations are based on maintenance criteria, maintenance history, experience with similar equipment, real-time field data, and resource constraints. Hardware and software are used to accomplish these two purposes. The RCM system includes instrumentation that monitors critical substation equipment as well as computer software that helps analyze equipment data.

Purucker, S.L.

1992-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Updated Cost and Performance Estimates for Clean Coal Technologies Including CO2 Capture - 2006  

Science Conference Proceedings (OSTI)

Construction and commodity costs were relatively stable for the period 2000-2003. However there were also very few orders for new coal plants in that period when Natural Gas Combined Cycle (NGCC) Plants were mostly the chosen technology selection. Since 2003 the value of the US dollar has been reduced versus other currencies. The rapid increases in crude oil and natural gas prices since early 2004 have also produced marked increases in several commodities and thereby the cost of construction of power pla...

2007-03-27T23:59:59.000Z

42

Including Retro-Commissioning in Federal Energy Savings Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

11.2 Retro-Cx in Federal ESPCs Including Retro-Commissioning In Federal Energy Saving Performance Contracts Retro-commissioning generally reduces operating and maintenance costs,...

43

Updated Cost and Performance Estimates for Clean Coal Technologies Including CO2 Capture - 2005  

Science Conference Proceedings (OSTI)

There was very little increase in the estimated capital cost of new coal fired plants over the 2000- 2003 period. However there were also very few orders for new coal plants in that period when Natural Gas Combined Cycle (NGCC) Plants were mostly the chosen selection. Since 2003 the value of the US dollar has been reduced versus other currencies. The greatly increased price of crude oil and natural gas since 2003 has also led to an increase in the price of basic commodities such as steel and cement. The ...

2006-03-20T23:59:59.000Z

44

FMAC: Coal-Handling Maintenance Guide  

Science Conference Proceedings (OSTI)

The Coal Handling System Maintenance Guide provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs for the coal handling system.

2006-12-22T23:59:59.000Z

45

Integrated Chiller System Reduce Building Operation and Maintenance Costs in Cold Climates  

E-Print Network (OSTI)

Although water-cooled chillers are more energy efficient than air-cooled chillers, a majority of chilled water systems use air-cooled chillers. In cold weather climates, air-cooled chillers are capable of functioning in low ambient temperatures with few operational concerns, where as water-cooled chiller systems must be equipped to prevent cooling tower freezing. The integrated chiller system attempts to take advantage of each chiller's strengths and eliminate any cold weather operational concerns. An integrated chiller system includes a cooling tower and air-cooled condenser. During the summer, both the cooling tower and air condenser can be operated. In cold weather, the cooling tower is drained and the air condenser is used to dissipate the heat of the cooling system. The integrated chiller system eliminates the water storage tank and frequent charging and discharging of the cooling tower system. It reduces the size of the mechanical room and simplifies the operation of the system. The integrated chiller system is most suitable in climates where the mechanical cooling is required on a short-term basis during cold weather periods. This paper presents the system configuration, system design, optimal control, and energy impact. An example is used to demonstrate the design concepts of the integrated chiller systems.

Sheets, N.; Liu, M.

2003-01-01T23:59:59.000Z

46

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections–2013: Supplemental Addition  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.BackgroundAs a focus of innovative approaches and techniques, maintenance of aging steam ...

2013-12-17T23:59:59.000Z

47

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections, Volume 1: General Practices  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.BackgroundAs a focus of innovative approaches and techniques, maintenance of aging steam ...

2013-12-23T23:59:59.000Z

48

Nuclear Maintenance Applications Center: Condenser Cleaning Equipment Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides power plant maintenance personnel with current maintenance information on condenser cleaning systems. The report will help these personnel to improve the reliability and reduce the maintenance costs for the condenser cleaning equipment used in power plants.

2007-12-21T23:59:59.000Z

49

Condenser Application and Maintenance Guide  

Science Conference Proceedings (OSTI)

The Condenser Application and Maintenance Guide provides plant personnel with information on the operation, maintenance, and performance of condensers. The contents of this guide will assist plants in improving condenser performance, reducing maintenance costs, and increasing condenser reliability.

2001-08-23T23:59:59.000Z

50

Nuclear Maintenance Applications Center: Condenser Air Removal Equipment Maintenance Guide  

Science Conference Proceedings (OSTI)

The Condenser Air Removal Equipment Maintenance Guide provides power plant maintenance personnel with current maintenance information on this system. This guide will assist the plant maintenance personnel in improving reliability and reducing maintenance costs for the condenser air removal (CAR) equipment.

2007-12-21T23:59:59.000Z

51

Building Energy Software Tools Directory: Maintenance Edge  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Edge Maintenance Edge Maintenance Edge logo Maintenance Edge is a suite of online Software as a Service (SaaS) facility management tools that gives control and management over buildings without a capital investment. Maintenance Edge enables you to combine work order, planned maintenance, work order wireless, and critical alarms with the option of adding inventory. Fully implemented, Maintenance Edge will cut labor time, increase energy efficiencies, save on capital expenditures, and save on budget and management time. Features include: easy/user-friendly work order requesting, unlimited users, seven different user roles (limits data users can see), no capital or hardware costs required, access to data anywhere anytime, easy-to-click reporting on all the data in your system,

52

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Sheet for 2013 Nissan Leaf Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 5142013 456 Replaced right front strut NC...

53

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

3CE000672 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 6102013 7,426...

54

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

0DU103929 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 342013 4,876 Replaced relay assembly, engine...

55

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

6DU111078 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2192013 8,362 Changed oil - under warranty...

56

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

XBU100914 Maintenance Sheet for 2011 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 6192012 14,694 Replaced one tire and rotated...

57

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

2DU113491 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2192013 8,466 Changed oil - under warranty...

58

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

XDU104313 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2182013 8,513 Changed oil - under warranty...

59

Low Wind Speed Technology Phase II: Development of an Operations and Maintenance Cost Model for LWST; Global Energy Concepts  

SciTech Connect

This fact sheet describes a subcontract with Global Energy Concepts to evaluate real-world data on O&M costs and to develop a working model to describe these costs for low wind speed sites.

Not Available

2006-03-01T23:59:59.000Z

60

70972 Federal Register / Vol. 76, No. 221 / Wednesday, November 16, 2011 / Notices (including hours and cost) of the  

E-Print Network (OSTI)

and cost) of the proposed collection of information; (c) ways to enhance the quality, utility, and clarity. ADDRESSES: The Council meeting will be held at the Hilton Hotel, 500 West Third Ave., Anchorage, AK

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Capital and Maintenance Projects for Efficiency Improvements  

Science Conference Proceedings (OSTI)

This Electric Power Research Institute (EPRI) project developed a methodology to assess the costs and benefits of potential maintenance improvements to coal-fired power plants, refined the methodology developed in 2008 to assess the net annual benefit of potential capital improvements to these plants, and applied the methodologies to a hypothetical plant. The calculations are captured in two spreadsheets8212one for capital projects and the other for maintenance projects8212that are included in the report...

2009-10-13T23:59:59.000Z

62

USE OF THE DRY MAINTENANCE FACILITY FOR HRT MAINTENANCE  

SciTech Connect

A portable shield was utilized in performing nine semidirect dry maintenance jobs on the HRT. The shield proved to be completely reliable, affording a considerable savings in maintenance costs and reactor downtime. (auth)

Jarvis, J.P.

1962-09-17T23:59:59.000Z

63

Method and computer program product for maintenance and modernization backlogging  

DOE Patents (OSTI)

According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

2013-02-19T23:59:59.000Z

64

Operations and Maintenance Manual for Large Aperture Scanner System  

Science Conference Proceedings (OSTI)

Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

Jones, Anthony M.; Hall, Thomas E.

2010-04-08T23:59:59.000Z

65

Maintenance Effectiveness Assessment  

Science Conference Proceedings (OSTI)

Utilities want to know whether their equipment is being maintained in the most effective manner. Understanding the relationship between maintenance costs and benefits becomes even more important when established practices and schedules change. This report defines the problem of and presents a roadmap for the development of metrics for evaluating substation equipment maintenance effectiveness. A proposed suite of tools for assessing maintenance effectiveness TAME can provide a business analytics framework...

2010-12-23T23:59:59.000Z

66

Offshore software maintenance methodology  

Science Conference Proceedings (OSTI)

Keywords: maintenance methodology, offshore maintenance, remote maintenance, software economics, software maintenance

M. Pavan Kumar; V. Sita Rama Das; N. Netaji

1996-05-01T23:59:59.000Z

67

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

0CE002590 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 1252013 7,925 Changed oil and filter and...

68

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

7CE000612 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 1172013 6,327 Changed oil and filter and...

69

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

5CE002486 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 212013 7,892 Changed oil and filter and...

70

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

8BU100815 Maintenance Sheet for 2011 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 882012 17,160 Changed oil and filter and...

71

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DU2A5010462 Maintenance Sheet for 2010 Toyota Prius Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 11232009 5,935 Changed oil and filter,...

72

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DU5A0006063 Maintenance Sheet for 2010 Toyota Prius Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 8192009 5,090 Changed oil and filter and...

73

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DP8D3038660 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6222013 6,331 5K service -...

74

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6132013 5,220 5K service - under...

75

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DP6D3038663 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6122013 5,078 5K service -...

76

Centrifugal and Positive Displacement Charging Pump Maintenance Guide  

Science Conference Proceedings (OSTI)

In pressurized water reactors, charging pumps provide charging flow to the RCS and are also required to be available in the event of a loss of coolant accident (LOCA) event. Pump availability combined with modes of operation have made pump maintenance both frequent and costly. This report provides techniques to assist utilities in reducing maintenance costs for these pumps. Areas for improving reliability of these pumps include: excessive seal leakage, definition of acceptable seal leakage, packing life,...

1996-12-31T23:59:59.000Z

77

Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994  

SciTech Connect

This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

Fisk, E.L.

1994-06-01T23:59:59.000Z

78

Electric Motor Tiered Maintenance Program  

Science Conference Proceedings (OSTI)

Electric motor predictive and preventive maintenance guidance has been developed to provide information to help maximize motor reliability and to minimize the need for major motor repairs. However, if all recommendations presented in most guides are followed and applied to all motors, the cost of motor maintenance would be unwieldy and consume more than its share of maintenance budgets.

2002-08-27T23:59:59.000Z

79

Compressed Air System Maintenance Guide  

Science Conference Proceedings (OSTI)

The "Compressed Air System Maintenance Guide" provides fossil plant personnel with information on the operation and maintenance of the compressed air system. The contents of this guide will assist personnel in improving performance of the compressed air system, reducing maintenance costs, and increasing air system reliability.

2002-11-27T23:59:59.000Z

80

Electric Motor Predictive and Preventive Maintenance Guide  

Science Conference Proceedings (OSTI)

Electric motor failure could result in lost capacity as well as excessive repair and maintenance costs. This guide provides information on establishing an effective maintenance program to help prevent unexpected motor failures, costly downtime, and unnecessary maintenance costs. Specifically, the guide summarizes technical data relative to four basic power plant motor types and associated components.

1992-05-02T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Nuclear Maintenance Applications Center: Feed Pump Turbine Maintenance Guide  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Steam Turbines and Auxiliaries Program 65 and the Nuclear Maintenance Application Center have developed a series of maintenance guides to assist plant personnel with the performance of various maintenance tasks associated with a wide variety of plant components. The objective of this project was to publish a maintenance guide for the feed pump turbines that included an ...

2012-09-25T23:59:59.000Z

82

Photovoltaic Operation and Maintenance Evaluation  

Science Conference Proceedings (OSTI)

Results from this study confirm that photovoltaic power plants require low operating and maintenance costs per kilowatthour. Projections based on these results suggest that in the future costs will fall below 0.5 cent per kilowatthour.

1990-01-11T23:59:59.000Z

83

Maintenance implementation plan for fuel supply shutdown  

Science Conference Proceedings (OSTI)

This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ``MAINTENANCE MANAGEMENT PROGRAM``, that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan.

Stephenson, R.L.

1995-06-01T23:59:59.000Z

84

Status of fusion maintenance  

SciTech Connect

Effective maintenance will be an essential ingredient in determining fusion system productivity. This level of productivity will result only after close attention is paid to the entire system as an entity and appropriate integration of the elements is made. The status of fusion maintenance is reviewed in the context of the entire system. While there are many challenging developmental tasks ahead in fusion maintenance, the required technologies are available in several high-technology industries, including nuclear fission.

Fuller, G.M.

1984-01-01T23:59:59.000Z

85

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections 2010--Volume 3: Balancing and A lignment  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2010-12-23T23:59:59.000Z

86

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections -- 2011: Volume 2, Repair Proce dures  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2012-07-31T23:59:59.000Z

87

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections—2007: Volumes 2 and 4 Sup plemental Additions  

Science Conference Proceedings (OSTI)

Up to 70 of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2008-03-27T23:59:59.000Z

88

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections-2006; Volume 1: General Practic es  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2007-03-30T23:59:59.000Z

89

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections 2010--Volume 4: Turbine Generat or Component Procurement Specifications  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2010-12-23T23:59:59.000Z

90

Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections-2006; Volume 4: Turbine-Generat or Component Procurement Specifications  

Science Conference Proceedings (OSTI)

Up to 70% of the outages planned for conventional steam power plants involve work on the turbine. The challenge for the engineer is to improve performance and extend reliability, while eliminating unproductive activities from the maintenance outage schedule. This report provides general guidelines for planning and performing maintenance on steam turbines during outages.

2007-03-30T23:59:59.000Z

91

Management Applications of Maintenance Reports  

E-Print Network (OSTI)

The good computerized maintenance management systems available today provide Plant Engineers with sufficient data to institute policies and procedures to materially affect the company profits. Regrettably, the vast majority of these Engineers and their Maintenance Managers seem content to simply produce PM work orders, maintenance equipment repair histories and generate a few activity reports. A straightforward and practical application of the available cost and performance data enables maintenance management to constantly fine tune operational procedures to minimize cost and equipment failure from the available data. Using this data, the manager can easily measure the total effect of maintenance on his company's overall performance. The practical application of this data to reduce overall maintenance cost and to increase equipment availability is discussed in this paper.

Gehl, P.

1993-03-01T23:59:59.000Z

92

Real-time turbine maintenance system  

Science Conference Proceedings (OSTI)

Reliable power generation and low maintenance costs are the major goals of power plant administration. This goal, in fact, can be achieved by a proper turbine maintenance policy. This study presents a model for total productive maintenance to enhance ... Keywords: Radio frequency identification, Total productive maintenance, Turbine

Tung-Liang Chen

2009-05-01T23:59:59.000Z

93

Bottom Ash System Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to personnel involved in the bottom ash system and its components, including good maintenance practices, condition monitoring, predictive and preventive maintenance techniques, probable failure modes, and troubleshooting guidance. The guide was developed primarily to provide detailed maintenance and troubleshooting information but also includes basic system information.

2000-10-31T23:59:59.000Z

94

Operations & Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

95

Fire Protection Equipment Surveillance Optimization and Maintenance Guide  

Science Conference Proceedings (OSTI)

Performance-based analysis methods are finding widespread application in many industries, including the nuclear power industry, and in many areas, including design, maintenance, and operations. Fire protection surveillance tests and inspections are well suited for performance-based analysis and trending, so transitioning to a performance-based program is achievable and cost-effective for nuclear power plants.

2003-07-18T23:59:59.000Z

96

Predictive Maintenance Program: Development and Implementation  

Science Conference Proceedings (OSTI)

Many forces -- the economy, competition, regulatory agencies -- are pressuring utilities to reduce operating and maintenance (O&M) costs without cutting back on reliability or availability. Many utility managers are re-evaluating their maintenance strategies to meet these demands. To show utilities how to reduce maintenance costs and extend the effective operating life of equipment, EPRI has organized an annual workshop around a unique management approach -- Predictive Maintenance (PDM).

1999-06-25T23:59:59.000Z

97

External costs of intercity truck freight transportation  

E-Print Network (OSTI)

From a societal perspective, it is desirable for all transportation users to pay their full social (private and external) costs. We estimate four general types of external costs for intercity freight trucking and compare them with the private costs incurred by carriers. Estimated external costs include: accidents (fatalities, injuries, and property damage); emissions (air pollution and greenhouse gases); noise; and unrecovered costs associated with the provision, operation, and maintenance of public facilities. The analysis reveals that external costs are equal to 13.2 % of private costs and user fees would need to be increased about

David J. Forkenbrock

1999-01-01T23:59:59.000Z

98

TOWARDS A MAINTENANCE SEMANTIC ARCHITECTURE Mohamed Hedi Karraya  

E-Print Network (OSTI)

packages (Computerized Maintenance Management System). The daily events of maintenance were treated a complex information system for maintenance management [9]. The project aimed to develop a collaborative including the existing systems of data acquisition, control, maintenance management, diagnosis assistance

Paris-Sud XI, Université de

99

Fundamental Laws and Assumptions of Software Maintenance Adam A. Porter  

E-Print Network (OSTI)

environments. The longer a system stays in service, the larger maintenance costs are, and, therefore, it­oriented programming languages, software architectures and configuration management. Managing the maintenance process. Maintenance is costly and somewhat unpredictable. Thus, management tools for controlling maintenance

Porter, Adam

100

A condition-based maintenance policy for intelligent monitored system  

Science Conference Proceedings (OSTI)

This study proposes a sequential Condition-Based Maintenance (CBM) policy for intelligent monitored system based on cost and reliability prioritisation. It is assumed that system's reliability could be continuously monitored, whenever ... Keywords: CBM, condition-based maintenance, cost, intelligent monitoring, maintenance policy, optimisation, predictive maintenance, reliability, simulation

Wenzhu Liao; Ershun Pan; Lifeng Xi

2009-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

10 MWe Solar Thermal Central Receiver Pilot Plant maintenance experience, January 1982-March 1983  

DOE Green Energy (OSTI)

This report presents a description of the maintenance experience at the 10 MWe Solar Thermal Central Receiver Pilot Plant near Barstow, California, during the period January 1982 through March 1983. The plant systems are briefly described, and statistical data on maintenance orders, labor requirements, and maintenance costs are presented. The data presented have been extracted from Southern California Edison historical maintenance records accumulated at the plant. Pilot plant systems requiring the most maintenance activity are identified so that efforts to reduce plant maintenance costs can be properly identified. The information is analyzed for the purpose of developing a data base for general use during the economic assessment, design, and staff planning of future solar central receiver plants. However, data presented here from the Pilot Plant should not be used for direct scaling of larger power production plants. The number and size of equipment items for larger plants will not scale, the designs will vary, and the Pilot Plant includes special testing and evaluation equipment which would not be necessary in plants built for the sole purpose of power production. Data taken at the Pilot Plant during the early plant startup and operational phase shows an annual maintenance cost of approximately one perent of the recurring plant capital cost. Similar costs for recent technology steam electric generating plants are estimated to range from 1.5 to 3%. The Pilot Plant maintenance cost will not appear as favorable if based on energy produced during power production due to the small plant size and equipment intensive nature of the plant. The solar-unique systems of the plant required 45% of the total plant maintenance labor and 39% of the total maintenance cost, both percentages being lower than anticipated.

Smith, J.W.

1985-05-01T23:59:59.000Z

102

DSOM (Decision Support for Operations and Maintenance ...  

Summary. Operations and maintenance (O&M) can make or break a business - especially with today's rising energy costs. DSOM® (Decision Support for ...

103

Nuclear Maintenance Applications Center: Compression Fitting Application Manual  

Science Conference Proceedings (OSTI)

The Nuclear Maintenance Applications Center: Compression Fitting Application Manual provides power plant maintenance personnel with current maintenance information on this type of component used in power plants, both fossil fuel and nuclear. This guide will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs for this equipment.

2008-12-22T23:59:59.000Z

104

Burner Management System Maintenance Guide for Fossil Power Plant Personnel  

Science Conference Proceedings (OSTI)

Burner Management System Maintenance Guide for Fossil Power Plant Personnel provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs associated with the burner management system.

2008-03-25T23:59:59.000Z

105

Flue Gas Desulfurization Scrubber Maintenance Guide: Gypsum Dewatering Area  

Science Conference Proceedings (OSTI)

Flue Gas Desulfurization Scrubber Maintenance Guide: Gypsum Dewatering Area provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist the plant maintenance personnel in improving the reliability and reducing the maintenance costs for this area of their scrubber system.

2009-12-08T23:59:59.000Z

106

Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation  

SciTech Connect

Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications.

Timothy Shaw; Anthony Baratta; Vaughn Whisker

2005-02-28T23:59:59.000Z

107

Streamlined Reliability Centered Maintenance Analysis Application Update  

Science Conference Proceedings (OSTI)

A systematic evaluation of plant equipment and maintenance requirements using reliability centered maintenance (RCM) techniques can help hold down operating costs while maintaining plant availability and reliability. This report describes the application of streamlined reliability centered maintenance (streamlined RCM) methodology and software at four utilities.

2001-10-18T23:59:59.000Z

108

Gas Turbine Technology, Part B: Components, Operations and Maintenance  

E-Print Network (OSTI)

This paper builds on Part A and discusses the hardware involved in gas turbines as well as operations and maintenance aspects pertinent to cogeneration plants. Different categories of gas turbines are reviewed such as heavy duty aeroderivative, single and split shaft. The pros and cons of different types are reviewed. Gas turbine component types - axial and centrifugal compressors and different turbine types, along with combustor types will be discussed. Important considerations during machine specifications are also reviewed. Practical aspects such as coatings, materials, fuel handling and auxiliary systems will also be highlighted. Operations and maintenance aspects including Preventative Maintenance, Repairs, Fuel and Air Filtration, Compressor Washing and Reliability is discussed. Typical operating and maintenance costs are provided. This paper presents an extensive bibliography to enable readers to follow up any topic in detail.

Meher-Homji, C. B.; Focke, A. B.

1985-05-01T23:59:59.000Z

109

Nuclear Maintenance Applications Center: Isolated Phase Bus Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides information on design, operating experience, and maintenance practices associated with the isophase bus system. The information is meant to be useful for system engineers, component engineers, maintenance personnel, and their supervision in understanding and maintaining this system. This document is an update to Isolated Phase Bus Maintenance Guide (EPRI report TR-112784), and the scope has been expanded to include boundary components, such as potential transformers (PTs) and current...

2007-12-20T23:59:59.000Z

110

Equipment Maintenance Optimization Manual Applications  

Science Conference Proceedings (OSTI)

This report is a compilation of Equipment Maintenance Optimization Manuals (EMOMs) that include procedures and troubleshooting supported by broad-based utility experience. EMOMs for critical generating station equipment allows power generating plants to replace existing maintenance practices with the latest industry best practices. Using this information as a benchmark, current practices can be validated or adjusted for more optimum performance of the overall maintenance process. In addition, the EMOMs c...

2001-12-21T23:59:59.000Z

111

Costs of Urban Stormwater Control Practices Arvind Narayanan  

E-Print Network (OSTI)

. The life-cycle project costs include the initial construction costs, in addition to long- term maintenance)......................................................................................................................76 Table 64. Estimated Capital Cost of a 1.5-foot Deep, 10-feet Wide, 1,000-feet Long Grass Swale (SEWRPC)......................................................................................................................78 Table 65. Estimated Capital Cost of a 3.0-feet Deep, 21-feet Wide, 1,000-feet Long Grass Swale (SEWRPC

Pitt, Robert E.

112

Flue Gas Desulfurization Scrubber Maintenance Guide: Absorber Area  

Science Conference Proceedings (OSTI)

The Flue Gas Desulfurization Scrubber Maintenance Guide: Absorber Area provides fossil plant maintenance personnel with current maintenance information on this system and will help to improve the reliability of and reduce the maintenance costs for this area of their scrubber system.

2008-12-18T23:59:59.000Z

113

Flue Gas Desulfurization Scrubber Maintenance Guide: Reagent Preparation Area  

Science Conference Proceedings (OSTI)

The Flue Gas Desulfurization Scrubber Maintenance Guide: Reagent Preparation Area provides the fossil plant maintenance personnel with current maintenance information on this system and will help improve the reliability and reduce the maintenance costs for this area of their scrubber system.

2008-12-15T23:59:59.000Z

114

Federal Energy Management Program: Maintenance Types  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Types Maintenance Types Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the following can ensure an optimal blend of cost and life-cycle effectiveness: Reactive Maintenance: Follows a "run it until it breaks" strategy. No action or effort is taken to maintain equipment, prevent failure, or ensure life of the system - even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time or machine run time schedules. Predictive Maintenance: Strives to detect the onset of equipment degradation and address the problems as they are identified. Several predictive maintenance technologies exist.

115

Cost analysis guidelines  

Science Conference Proceedings (OSTI)

The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

Strait, R.S.

1996-01-10T23:59:59.000Z

116

Environmental externalities: Applying the concept to Asian coal-based power generation. [Includes external environmental and societal costs and methods of evaluating them  

SciTech Connect

This report examines the concept of environmental externality. It discusses various factors -- the atmospheric transformations, relationship of point-source emissions to ambient air quality, dose-response relationships, applicable cause-and-effect principles, and risk and valuation research -- that are considered by a number of state utilities when they apply the environmental externality concept to energy resource planning. It describes a methodology developed by Argonne National Laboratory for general use in resource planning, in combination with traditional methods that consider the cost of electricity production. Finally, it shows how the methodology can be applied in Indonesia, Thailand, and Taiwan to potential coal-fired power plant projects that will make use of clean coal technologies.

Szpunar, C.B.; Gillette, J.L.

1993-03-01T23:59:59.000Z

117

SCAMP Code -- Strategic Capacity Axial-Compressor Maintenance Program, Version 2.00  

Science Conference Proceedings (OSTI)

The Strategic Capacity Axial-Compressor Maintenance Program (SCAMP) spreadsheet provides combustion turbine operators with a low-cost, easy-to-install, easy-to-use program for monitoring combustion turbine axial compressor and overall turbine performance. It can be used to diagnose the condition of axial compressors and to determine the benefits of maintenance actions such as an off-line compressor wash. Important features of the SCAMP spreadsheet include the following: o Operates as a spreadsheet with m...

2000-12-12T23:59:59.000Z

118

Estimation of Highway Maintenance Marginal Cost under Multiple Maintenance Activities  

E-Print Network (OSTI)

funded by 5th Framework RTD Programme. ITS, University of1.1, Funded by 5th Framework RTD Programme. ITS, University

Anani, Shadi B.; Madanat, Samer M

2010-01-01T23:59:59.000Z

119

FACILITIES MAINTENANCE & UPKEEP The Lawrence campus is operating three different custodial and maintenance groups on campus resulting in  

E-Print Network (OSTI)

facilities management system, and provide the adequate tools and training necessary. · Implementing contemporary zone maintenance will reduce management and layers, enabling costFACILITIES MAINTENANCE & UPKEEP Context · The Lawrence campus is operating three

Peterson, Blake R.

120

Sound maintenance practices protect fan investments  

Science Conference Proceedings (OSTI)

Since underground coal miners depend on axial fans, lack of maintenance could prove costly. A number of pre-emptive actions that can help keep fans running at optimal performance can also be taken. 2 photos.

Bauer, M.

2009-11-15T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Pulverizer Maintenance Guide  

Science Conference Proceedings (OSTI)

The Pulverizer Maintenance Guide, Volume 3: Ball/Tube Mills provides fossil plant personnel with current maintenance information on ball/tube mills from different manufacturers. This guide will assist a plant in improving the maintenance of their pulverizer mills.

2006-03-31T23:59:59.000Z

122

Filter system cost comparison for IGCC and PFBC power systems  

SciTech Connect

A cost comparison was conducted between the filter systems for two advanced coal-based power plants. The results from this study are presented. The filter system is based on a Westinghouse advanced particulate filter concept, which is designed to operate with ceramic candle filters. The Foster Wheeler second-generation 453 MWe (net) pressurized fluidized-bed combustor (PFBC) and the KRW 458 MWe (net) integrated gasification combined cycle (IGCC) power plants are used for the comparison. The comparison presents the general differences of the two power plants and the process-related filtration conditions for PFBC and IGCC systems. The results present the conceptual designs for the PFBC and IGCC filter systems as well as a cost summary comparison. The cost summary comparison includes the total plant cost, the fixed operating and maintenance cost, the variable operating and maintenance cost, and the effect on the cost of electricity (COE) for the two filter systems.

Dennis, R.A.; McDaniel, H.M.; Buchanan, T. [and others

1995-12-01T23:59:59.000Z

123

The impact of maintenance and rehabilitation strategies on the pavement network value  

E-Print Network (OSTI)

The maintenance and rehabilitation of road infrastructure demands a great investment of time and money. The deterioration of pavement condition over time due to environmental factors and increasing traffic loads combined with the limitation of funds available for maintenance and rehabilitation creates a complex problem faced during the fund allocation process. Combinations of alternate funding levels and pavement management policies create different impacts on the network condition and future funding needs. The impacts of such decisions are one of the main concerns at strategic management levels where decisions about pavement maintenance and rehabilitation policies and funding levels are made. Pavement management systems have been used since about 1970 to assist in selecting candidate sections for treatment and identifying cost-effective treatments. Some engineering and economic models compare different maintenance and rehabilitation alternatives considering user costs, including vehicle operating costs, time of travel, and frequency of accidents; as well as agency costs, including maintenance and rehabilitation costs. User benefits are calculated by subtracting the user costs for a given strategy from the user costs from a do nothing strategy. However, these benefits do not necessarily translate into funds available to the agency. An asset management approach to assess the impact of pavement maintenance and rehabilitation scenarios on the pavement network value is presented in this research, and a case study is developed to evaluate the applicability of the method. This approach considers the effects of pavement maintenance and rehabilitation scenarios on the pavement network value in terms of the agency costs needed to recover the value of the asset. Methods for the quantifying the pavement network value over time, estimating agency costs, and analyzing the results are discussed. Results from a case study indicate that the method is able to assess the impact of pavement maintenance and rehabilitation strategies. This approach shows that there is an increase in the agency costs when treatments are delayed due to budget constraints or ineffective agency policies. Guidelines to report the impact of pavement management strategies are also outlined.

Chang Albitres, Carlos Martin

1999-01-01T23:59:59.000Z

124

Microsoft Word - maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System Maintenance Checklist System Maintenance Checklist The following checklist is intended to provide system owners, project managers and other information system developers and maintainers with guidance in identifying and planning system maintenance activities. The objectives of system maintenance are summarized as: C Resolution of errors, faults, and failures. C The requirements for system maintenance initiates lifecycle changes. The change is remapped and executed, thereby treating the maintenance process as iterations of development. Rev: 09/02 1 Maintenance Checklist SEM Reference Comments " A procedure exists for handling emergency changes that cannot be implemented as part of a scheduled release. Chapter 10 Maintenance " An identification number is assigned to the modification.

125

Cylinder Surveillance and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Surveillance and Maintenance Cylinder Surveillance and Maintenance DOE has a Cylinder Management program in place to inspect and maintain depleted UF6 cylinders, and to improve...

126

Maintenance-free automotive battery  

SciTech Connect

Two types of maintenance-free automotive batteries were developed by Japan Storage Battery Co. to obtain a maintenance-free battery for practical use and to prevent deterioration of the battery during long storage and/or shipment. Design considerations included a special grid alloy, the separator, plate surface area, vent structure, and electrolyte. Charge characteristics, overcharge characteristics, life characteristics under various conditions, and self-discharge characteristics are presented. The characteristics of the maintenance-free battery with a Pb-Ca alloy grid are superior to those of a conventional battery. 10 figures, 1 table. (RWR)

Kano, S.; Ando, K.

1978-01-01T23:59:59.000Z

127

Terminal automation system maintenance  

SciTech Connect

Nothing has improved petroleum product loading in recent years more than terminal automation systems. The presence of terminal automation systems (TAS) at loading racks has increased operational efficiency and safety and enhanced their accounting and management capabilities. However, like all finite systems, they occasionally malfunction or fail. Proper servicing and maintenance can minimize this. And in the unlikely event a TAS breakdown does occur, prompt and effective troubleshooting can reduce its impact on terminal productivity. To accommodate around-the-clock loading at racks, increasingly unattended by terminal personnel, TAS maintenance, servicing and troubleshooting has become increasingly demanding. It has also become increasingly important. After 15 years of trial and error at petroleum and petrochemical storage and transfer terminals, a number of successful troubleshooting programs have been developed. These include 24-hour {open_quotes}help hotlines,{close_quotes} internal (terminal company) and external (supplier) support staff, and {open_quotes}layered{close_quotes} support. These programs are described.

Coffelt, D.; Hewitt, J. [Engineered Systems Inc., Tempe, AZ (United States)

1997-01-01T23:59:59.000Z

128

Electricity Energy Storage Technology Options 2012 System Cost Benchmarking  

Science Conference Proceedings (OSTI)

This report provides an update on the current capital and lifecycle costs estimates of electric energy storage options for a variety of grid and end-user applications. Data presented in this report update 2010 data provided in EPRI Technical Report 1020676. The goal of this research was to develop objective and consistent installed costs and operational and maintenance costs for a set of selected energy storage systems in the identified applications. Specific objectives included development of ...

2012-12-10T23:59:59.000Z

129

Computerized Maintenance Management Systems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations & Maintenance » Computerized Program Areas » Operations & Maintenance » Computerized Maintenance Management Systems Computerized Maintenance Management Systems October 7, 2013 - 9:35am Addthis Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff. Capabilities Typical CMMS functions depend on the complexity of the system chosen. Examples include: Work order generation, prioritization, and tracking by equipment and/or component. Work orders often can be sorted by equipment, date, person responding, etc. Tracking scheduled and unscheduled maintenance activities Storing technical documentation and maintenance procedures by

130

Flue Gas Desulfurization Scrubber Maintenance Guide: Wastewater Treatment and Gypsum Handling Area  

Science Conference Proceedings (OSTI)

The Flue Gas Desulfurization Scrubber Maintenance Guide: Wastewater Treatment and Gypsum Handling Area provides fossil plant maintenance personnel with current maintenance information on these systems. This guide will assist plant maintenance personnel in improving the reliability and reducing the maintenance costs for these areas of their scrubber system.

2009-12-23T23:59:59.000Z

131

Facilities Cost Pool: Maintenance Service Responsibilities  

E-Print Network (OSTI)

Compressor, components and distribution FM FM FMD 17 STEAM Distribution to building systems FM FM C 18 STEAM Distribution to department equipment FM FMD FMD 19 VACUUM DISTRIBUTION Department SERVICE CONNECTION FM C C 13 PRIMARY ELECTRICAL SERVICE CONNECTIONS FM C C 14 STEAM UTILITY

Gulliver, Robert

132

A cask maintenance facility feasibility study  

SciTech Connect

The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1989-01-01T23:59:59.000Z

133

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES  

E-Print Network (OSTI)

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES DONALD H. GRAHAM Operations. The discussion will focus on the management, operation, and maintenance systems nec essary to support long maintenance management pro gram (j) cost accounting and a record keeping system to provide timely, accurate

Columbia University

134

`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES  

E-Print Network (OSTI)

the satisfaction of customers and profits. From a global perspective of lifecycle management, the role of (e)-maintenance maintenance actions. This idleness can be due to failures of some other elements in the system. More generally. But opportunistic maintenance can help save set-up costs and guarantee the expected performances for the system

Paris-Sud XI, Université de

135

Facilities Maintenance Guide  

Science Conference Proceedings (OSTI)

The subject of facilities maintenance is very broad and is commonly interpreted quite differently among maintenance managers at power plants and U.S. Department of Energy (DOE) nuclear and process facilities. In many cases, the maintenance of administrative buildings, support structures, and "real property" is managed separately from the maintenance of process equipment. The scope and breadth of each maintenance program varies from site to site, as does the formality of the program established to address...

2004-09-16T23:59:59.000Z

136

Mining Surveillance and Maintenance Dollars  

Science Conference Proceedings (OSTI)

Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

MARTINEZ, R.

2000-02-01T23:59:59.000Z

137

Generation Maintenance Application Center: Combustion Turbine Combined-Cycle Heat Recovery Steam Generator Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to assist personnel involved with the maintenance of the heat recovery steam generator at a combustion gas turbine combined cycle facility, including good maintenance practices, preventive maintenance techniques and troubleshooting guidance. BackgroundCombustion turbine combined cycle (CTCC) facilities utilize various components that can be unique to this particular type of power plant. As such, owners and ...

2013-05-15T23:59:59.000Z

138

HTGR Cost Model Users' Manual  

Science Conference Proceedings (OSTI)

The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

A.M. Gandrik

2012-01-01T23:59:59.000Z

139

Cost and Performance Assumptions for Modeling Electricity Generation Technologies  

Science Conference Proceedings (OSTI)

The goal of this project was to compare and contrast utility scale power plant characteristics used in data sets that support energy market models. Characteristics include both technology cost and technology performance projections to the year 2050. Cost parameters include installed capital costs and operation and maintenance (O&M) costs. Performance parameters include plant size, heat rate, capacity factor or availability factor, and plant lifetime. Conventional, renewable, and emerging electricity generating technologies were considered. Six data sets, each associated with a different model, were selected. Two of the data sets represent modeled results, not direct model inputs. These two data sets include cost and performance improvements that result from increased deployment as well as resulting capacity factors estimated from particular model runs; other data sets represent model input data. For the technologies contained in each data set, the levelized cost of energy (LCOE) was also evaluated, according to published cost, performance, and fuel assumptions.

Tidball, R.; Bluestein, J.; Rodriguez, N.; Knoke, S.

2010-11-01T23:59:59.000Z

140

Energy Storage Technology and Application Cost and Performance Data Base-2011  

Science Conference Proceedings (OSTI)

This product, an update to EPRI product 1020071, presents 2011 updated data on the cost, performance, and capabilities of energy storage systems for various applications. The data is presented in the form of an Excel workbook database. The goal of this research was to develop objective and consistent installed costs and operational and maintenance costs for a set of selected energy storage systems in the identified applications. Specific objectives included development of the installed costs and operatin...

2011-12-16T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker  

E-Print Network (OSTI)

New maintenance techniques for circuit breakers are studied in this dissertation by proposing a probabilistic maintenance model and a new methodology to assess circuit breaker condition utilizing its control circuit data. A risk-based decision approach is proposed at system level making use of the proposed new methodology, for optimizing the maintenance schedules and allocation of resources. This dissertation is focused on developing optimal maintenance strategies for circuit breakers, both at component and system level. A probabilistic maintenance model is proposed using similar approach recently introduced for power transformers. Probabilistic models give better insight into the interplay among monitoring techniques, failure modes and maintenance techniques of the component. The model is based on the concept of representing the component life time by several deterioration stages. Inspection and maintenance is introduced at each stage and model parameters are defined. A sensitivity analysis is carried to understand the importance of model parameters in obtaining optimal maintenance strategies. The analysis covers the effect of inspection rate calculated for each stage and its impact on failure probability, inspection cost, maintenance cost and failure cost. This maintenance model is best suited for long-term maintenance planning. All simulations are carried in MATLAB and how the analysis results may be used to achieve optimal maintenance schedules is discussed. A new methodology is proposed to convert data from the control circuit of a breaker into condition of the breaker by defining several performance indices for breaker assemblies. Control circuit signal timings are extracted and a probability distribution is fitted to each timing parameter. Performance indices for various assemblies such as, trip coil, close coil, auxiliary contacts etc. are defined based on the probability distributions. These indices are updated using Bayesian approach as the new data arrives. This process can be made practical by approximating the Bayesian approach calculating the indices on-line. The quantification of maintenance is achieved by computing the indices after a maintenance action and comparing with those of previously estimated ones. A risk-based decision approach to maintenance planning is proposed based on the new methodology developed for maintenance quantification. A list of events is identified for the test system under consideration, and event probability, event consequence, and hence the risk associated with each event is computed. Optimal maintenance decisions are taken based on the computed risk levels for each event. Two case studies are presented to evaluate the performance of the proposed new methodology for maintenance quantification. The risk-based decision approach is tested on IEEE Reliability Test System. All simulations are carried in MATLAB and the discussions of results are provided.

Natti, Satish

2008-12-01T23:59:59.000Z

142

Guidelines on the Effects of Cycling Operation on Maintenance Activities  

Science Conference Proceedings (OSTI)

Cyclic operation can result in an increase in forced outage rates, higher operation and maintenance (O&M) costs, and further wear and tear on components due to additional overhauls and maintenance. Such operation may also increase unforeseen costs due to additional personnel training requirements and the use of more sophisticated evaluation and inspection techniques. These guidelines are intended to help plant operators and engineers assess the impact of cycling on maintenance activities and take appropr...

2001-12-10T23:59:59.000Z

143

Cathodic Protection System Application and Maintenance Guide  

Science Conference Proceedings (OSTI)

Typically, cathodic protection system equipment includes rectifiers, anodes, anode junction boxes, reference cells (electrodes), and test stations. The scope of this guide includes addressing the maintenance and testing of the system, its components, and providing appropriate recommendations. These recommendations will provide the basis for a suitable preventive (PM) and predictive (PdM) maintenance program.

2005-12-23T23:59:59.000Z

144

Scheduling optimization of a real flexible job shop including side ...  

E-Print Network (OSTI)

Aug 19, 2013 ... including side constraints regarding preventive maintenance, fixture availabil- ...... Engineering and Engineering Management, pp. 787–791.

145

NREL: Energy Analysis - Levelized Cost of Energy Calculator  

NLE Websites -- All DOE Office Websites (Extended Search)

Levelized Cost of Energy Calculator Levelized Cost of Energy Calculator Transparent Cost Database Button The levelized cost of energy (LCOE) calculator provides a simple calculator for both utility-scale and distributed generation (DG) renewable energy technologies that compares the combination of capital costs, operations and maintenance (O&M), performance, and fuel costs. Note that this does not include financing issues, discount issues, future replacement, or degradation costs. Each of these would need to be included for a thorough analysis. To estimate simple cost of energy, use the slider controls or enter values directly to adjust the values. The calculator will return the LCOE expressed in cents per kilowatt-hour (kWh). The U.S. Department of Energy (DOE) Federal Energy Management Program

146

Feedwater Heater Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides plant personnel with information on the operation, maintenance, and performance of feedwater heaters. The contents of this guide will assist plant personnel in improving feedwater heater reliability, performance, and maintenance practices.

2002-05-29T23:59:59.000Z

147

Improve Operations & Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improve Operations & Maintenance Improve Operations & Maintenance Improve Operations & Maintenance Photo of an equipment room in a high-rise commercial office building with red and green equipment. Every building's energy consumption can benefit from rigorous operations and maintenance (O&M) practices. Properly planned and executed O&M is one of the most cost-effective strategies for ensuring equipment longevity, reliability, safety, and energy efficiency in commercial buildings. By one estimate, O&M measures cost about 20 times less and achieve roughly the same energy savings as energy efficiency upgrades. There are various opportunities to improve efficiency through O&M that can be discovered through efforts such as engaging tenants, training building staff, and

148

Maintenance and Veg Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Functions Infrastructure projects Interconnection OASIS OATT Reauthorization of Transmission Line Permits, Maintenance and Vegetation Management on Forest Service Lands...

149

Reliability-based maintenance evaluations and standard preventive maintenance programs  

SciTech Connect

Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the [open quotes]Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants[close quotes] prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated ([approximately]50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized.

Varno, M. (Vermont Yankee Nuclear Power Corp., Vernon, VT (United States)); McKinley, M. (Quadrex Energy Services Corp., Campbell, CA (United States))

1993-01-01T23:59:59.000Z

150

Sootblowing Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information concerning good maintenance practices, condition monitoring, predictive and preventive techniques, probable failure modes, and troubleshooting guidance to personnel involved in the maintenance of sootblowing systems and their components. This guide was developed to provide basic information as well as detailed maintenance and troubleshooting information.

2001-12-20T23:59:59.000Z

151

Performance Focused Maintenance for Distribution Substations  

Science Conference Proceedings (OSTI)

Performance Focused Maintenance (PFM) was introduced in 2005 as a generic concept to help maintenance managers cope with the competing objectives of maintaining service standards while containing costs. This report further develops the principles of PFM and integrates them into the larger power delivery asset management process. As the name implies, PFM focuses on performance and this report develops and demonstrates the steps required to establish proper performance measures and KPIs for PFM implementat...

2006-12-19T23:59:59.000Z

152

Evaluation of the Total Cost of Ownership of Fuel Cell-Powered Material Handling Equipment  

DOE Green Energy (OSTI)

This report discusses an analysis of the total cost of ownership of fuel cell-powered and traditional battery-powered material handling equipment (MHE, or more typically 'forklifts'). A number of fuel cell MHE deployments have received funding support from the federal government. Using data from these government co-funded deployments, DOE's National Renewable Energy Laboratory (NREL) has been evaluating the performance of fuel cells in material handling applications. NREL has assessed the total cost of ownership of fuel cell MHE and compared it to the cost of ownership of traditional battery-powered MHE. As part of its cost of ownership assessment, NREL looked at a range of costs associated with MHE operation, including the capital costs of battery and fuel cell systems, the cost of supporting infrastructure, maintenance costs, warehouse space costs, and labor costs. Considering all these costs, NREL found that fuel cell MHE can have a lower overall cost of ownership than comparable battery-powered MHE.

Ramsden, T.

2013-04-01T23:59:59.000Z

153

Optimized Maintenance of Generator Rotors  

Science Conference Proceedings (OSTI)

Generator rotor maintenance options are limited and expensive. The timing and scope of work done requires optimization to obtain the maximum benefits for continued long-term trouble-free operation. This document is a comprehensive guide to the maintenance of large generator rotors of 2 and 4 pole design that are cooled directly or indirectly by air or hydrogen. These include 50 and 60 Hz machines, operating at speeds of 1500, 1800, 3000, and 3600 RPM. The guide does not cover water-cooled rotors. The inf...

2004-12-13T23:59:59.000Z

154

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Operations and Maintenance Operations and Maintenance October 16, 2013 - 5:01pm Addthis Project Construction Commissioning Operations & Maintenance Operations and maintenance (O&M) programs are critical to successfully integrating renewable energy into new Federal building construction and major renovations. This overview covers the importance of O&M programs for renewable energy projects, creating a successful O&M program, and identifying the right team to carry out the program. It highlights typical renewable energy issues and recommends following the design, specifications, and recommendations from product manufacturers. Key Actions in Operations and Maintenance Make O&M a priority to protect agency investment. Include O&M input in design reviews.

155

Predictive Maintenance Technologies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Technologies Maintenance Technologies Predictive Maintenance Technologies October 28, 2013 - 10:15am Addthis Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs. Chapter 6 of the FEMP O&M Best Practices Guide (PDF 721 KB) outlines these technologies in detail. The full guide is also available (PDF 3.3 MB). Predictive maintenance technologies include: Thermography: Infrared imaging is used to generate visual images that identify variations in the infrared radiance of object surfaces. This method can be used to detect system surface wear, leaks, or failures. Lubricant and Wear Particle Analysis (a.k.a. Oil Analysis): Detailed analysis is taken to determine needed maintenance based on lubrication

156

Unit 16: Maintenance & Evolution To introduce the challenge of maintaining a  

E-Print Network (OSTI)

to deal with change ¥ Software maintenance - the general process of changing a system once it has been + 0.3IM)/100 #12;9 Techniques & tools for maintenance ¥ Key techniques Ð Configuration management Configuration management repositories When to stop maintenance? ¥ Is the cost of maintenance too high

Finkelstein, Anthony

157

Predictive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Maintenance Predictive Maintenance October 7, 2013 - 9:46am Addthis Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration. Predictive maintenance differs from preventive maintenance because maintenance is based on the condition of the machine instead of a preset schedule. This eliminates the unneeded maintenance concerns of preventive programs. Several predictive maintenance technologies are available. Federal agencies can leverage a combination of these technologies within their maintenance programs. Advantages A well-executed predictive maintenance program can almost eliminate catastrophic equipment failure because issues are identified and eliminated

158

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

7BA003539 7BA003539 Maintenance Sheet for 2011 Hyundai Sonata Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 7/19/2011 5,720 Changed oil and filter $14.67 10/12/2011 11,152 Changed oil and filter and rotated tires $60.49 10/21/2011 12,342 Upgraded ECU (TG5), replaced NVLD pressure sensor (TG6), and replaced cooling fan resistor (TG8) warranty 11/21/2011 16,442 Changed oil and filter $43.22 12/20/2011 22,497 Changed oil and filter and rotated tires $56.85 1/24/2012 28,205 Changed oil and filter $41.85 2/6/2012 30,100 30K service $109.16 2/9/2012 30,460 Recall: replaced two high voltage connectors at the HPCU n/c 2/27/2012 33,208 Changed oil and filter and rotated tires $56.85 3/24/2012 40,809 Changed oil and filter $41.85 4/20/2012 47,580 Changed oil and filter and rotated tires

159

Mechanical Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

160

Solicitation - Geothermal Drilling Development and Well Maintenance Projects  

DOE Green Energy (OSTI)

Energy (DOE)-industry research and development (R and D) organization, sponsors near-term technology development projects for reducing geothermal drilling and well maintenance costs. Sandia National Laboratories (Albuquerque, NM) administers DOE funds for GDO cost-shared projects and provides technical support. The GDO serves a very important function in fostering geothermal development. It encourages commercialization of emerging, cost-reducing drilling technologies, while fostering a spirit of cooperation among various segments of the geothermal industry. For Sandia, the GDO also serves as a means of identifying the geothermal industry's drilling fuel/or well maintenance problems, and provides an important forum for technology transfer. Successfully completed GDO projects include: the development of a high-temperature borehole televiewer, high-temperature rotating head rubbers, a retrievable whipstock, and a high-temperature/high-pressure valve-changing tool. Ongoing GDO projects include technology for stemming lost circulation; foam cement integrity log interpretation, insulated drill pipe, percussive mud hammers for geothermal drilling, a high-temperature/ high-pressure valve changing tool assembly (adding a milling capability), deformed casing remediation, high- temperature steering tools, diagnostic instrumentation for casing in geothermal wells, and elastomeric casing protectors.

Sattler, A.R.

1999-07-07T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Analysis of Cycling Costs in Western Wind and Solar Integration Study  

DOE Green Energy (OSTI)

The Western Wind and Solar Integration Study (WWSIS) examined the impact of up to 30% penetration of variable renewable generation on the Western Electricity Coordinating Council system. Although start-up costs and higher operating costs because of part-load operation of thermal generators were included in the analysis, further investigation of additional costs associated with thermal unit cycling was deemed worthwhile. These additional cycling costs can be attributed to increases in capital as well as operations and maintenance costs because of wear and tear associated with increased unit cycling. This analysis examines the additional cycling costs of the thermal fleet by leveraging the results of WWSIS Phase 1 study.

Jordan, G.; Venkataraman, S.

2012-06-01T23:59:59.000Z

162

Maintenance and Insurance Options for Managing Technical Risks in Combustion Turbine Projects  

Science Conference Proceedings (OSTI)

Costs for combustion turbine maintenance typically represent over half of the total non-fuel operation and maintenance (O&M) costs for combined-cycle power plants. Technical risks in component durability and integrity expose owners/operators to higher costs for maintaining units in operating condition. Potentially catastrophic events have occurred that have required significant maintenance expenditures to cover costs of component repair and replacement. This report looks at aspects of insurance and long-...

2010-12-02T23:59:59.000Z

163

RM Maintenance Services  

NLE Websites -- All DOE Office Websites (Extended Search)

maintenance forces are responsible for over 118 substations and almost 5300 miles of transmission lines. The Rocky Mountain Region recently updated its Metering Policy. Its...

164

Data Base Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Database Maintenance Keys Page anyone in Site Operations Building Management (see Personnel) with your room number. If you are locked out during off-hours, contact Security on...

165

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field  

E-Print Network (OSTI)

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field Kristin Group, Davis, CA, USA 4 Southern California Edison, Irwindale, CA, USA ABSTRACT HVAC maintenance utilities across the nation to include HVAC maintenance measures in energy efficiency programs

California at Davis, University of

166

Generation Maintenance Application Center: Fuel Gas System for Combustion Turbine Combined Cycle Plant Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to assist personnel involved with the maintenance of the fuel gas system at a gas turbine combined cycle facility, including good maintenance practices, preventive maintenance techniques and troubleshooting guidance. BackgroundCombustion turbine combined cycle (CTCC) facilities utilize various components that can be unique to this particular type of power plant. As such, owners and operators of CTCC facilities may find ...

2013-05-15T23:59:59.000Z

167

Reliability Centered Maintenance (RCM) Technical Reference for Power Delivery  

Science Conference Proceedings (OSTI)

This technical reference expands on the original reliability centered maintenance (RCM) research performed by EPRI in the late 1990s. It incorporates nearly ten years of utility RCM experience in power delivery and emphasizes the requirements of managing and measuring maintenance programs. RCM's overall goal is to improve the economic posture of a utility by promoting cost-effective application of maintenance resources. This "Technical Reference for Power Delivery" serves as the "handbook" of RCM for the...

2003-12-10T23:59:59.000Z

168

Streamlined Reliability-Centered Maintenance (SRCM) Implementation Guidelines, Volume 3  

Science Conference Proceedings (OSTI)

Following EPRI's philosophy to use and expand existing technology if it makes economic sense, EPRI's Plant Maintenance Optimization (PMO) Target has adopted a reliability-centered maintenance (RCM) process called SRCM. SRCM provides a utility a cost-effective process to determine the optimum maintenance strategy for plant systems and equipment based on importance to business objectives. SRCM maintains all the basic steps of traditional RCM.

1999-12-03T23:59:59.000Z

169

Solar Water Heating System Maintenance and Repair | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Heating System Maintenance and Repair Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Solar energy systems require periodic inspections and routine maintenance to keep them operating efficiently. Also, from time to time, components may need repair or replacement. You should also take steps to prevent scaling, corrosion, and freezing. You might be able to handle some of the inspections and maintenance tasks on your own, but others may require a qualified technician. Ask for a cost estimate in writing before having any work done. For some systems, it may

170

Reliability Centered Maintenance (RCM) Technical Reference for Power Delivery  

Science Conference Proceedings (OSTI)

The overall goal of Reliability Centered Maintenance (RCM) is to improve the economic posture of a utility by promoting cost-effective application of maintenance resources. EPRI's RCM Technical Reference for Power Delivery provides utilities with essential technical data and guidance for conducting RCM studies of power delivery equipment and systems. It serves as the "handbook" of RCM for the utility power delivery sector.

1997-11-04T23:59:59.000Z

171

Maintenance and Application Guide for Control Relays and Timers  

Science Conference Proceedings (OSTI)

Reliable performance of control and timing relays is vital to the efficient operation of nuclear plants. This guide provides utilities practical, cost-effective methods for a control relay and timer maintenance program. It can help utilities optimize test and maintenance intervals while limiting expenditures.

1993-10-02T23:59:59.000Z

172

Strategic Capacity Axial-Compressor Maintenance Program (SCAMP) Version 2  

Science Conference Proceedings (OSTI)

The Strategic Capacity Axial-Compressor Maintenance Program (SCAMP) spreadsheet provides combustion turbine operators with a low-cost, easy-to-install, easy-to-use program for monitoring combustion turbine (CT) axial compressor performance. Utilities can use it to diagnose the condition of axial compressors and to determine the benefits of maintenance actions such as an off-line compressor wash.

2000-11-29T23:59:59.000Z

173

Feedwater Pump Turbine Controls and Oil System Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to personnel involved in the mechanical hydraulic controls (MHCs) of the feedwater pump turbine (FWPT), its associated components, and inherent oil system, including good maintenance practices, condition monitoring, predictive and preventive maintenance techniques, probable failure modes, and troubleshooting guidance. The guide was developed to provide maintenance and troubleshooting information as well as a basic background in mechanical hydraulic controls.

2001-12-20T23:59:59.000Z

174

Pennsylvania life cycle costing manual  

SciTech Connect

Until the 1970s, it was commonplace for institutions and governments to purchase equipment based on lowest initial (first) costs. Recurring costs such as operational, maintenance, and energy costs often were not considered in the purchase decision. If an agency wanted to buy something, it published specifications and requested bids from several manufacturers. Often, the lowest bidder who met the specifications won the job, with no consideration given to the economic life of the equipment or yearly recurring costs such as energy and maintenance costs. The practice of purchasing based on lowest initial costs probably did not make good economic sense prior to 1970, and it certainly does not make good sense now. The wise person will consider all costs and benefits associated with a purchase, both initial and post-purchase, in order to make procurement decisions that are valid for the life of the equipment. This describes a method of financial analysis that considers all pertinent costs: life cycle costing (LCC).

1996-02-01T23:59:59.000Z

175

A survey of HVDC operating and maintenance practices and their impact on reliability and performance  

Science Conference Proceedings (OSTI)

A questionnaire about operating, maintenance, and spare parts practices and station performance was sent to all HVDC converter stations worldwide. This survey is sponsored by IEEE Working Groups 15.05.08, Economics and Operating Strategies, and I7, Reliability of HVDC Converter Stations. Responses from 38 stations are analyzed, and information bout the most popular practices is reported. One important conclusion is that energy contracts, ac system constraints, and dedicated generation frequency have strong influences on the operation and maintenance practices of HVDC stations. A search is made for correlations between the operating, maintenance, and spare parts practices, including spending, and the stations` performance and availability. No conclusions about the most cost-effective practices can be made. The results are compared with those of a study published in 1992 which covered a few of the same topics.

Cochrane, J.J.; Emerson, M.P. [New England Power Co., Ayer, MA (United States); Donahue, J.A. [New England Power Service Co., Westborough, MA (United States); Wolf, G. [Public Service of New Mexico, Albuquerque, NM (United States)

1996-01-01T23:59:59.000Z

176

HEV Fleet Testing Maintenance Sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

U520038836 Advanced Vehicle Testing Activity Date Mileage Description Cost 8-Aug 11,142 Oil change 35.44 11-Oct 14,133 Rear Bumper damaged in collision (not included in...

177

Maintenance | OpenEI Community  

Open Energy Info (EERE)

Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

178

Static Seals Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides comprehensive technical information on the understanding and maintenance of static seals. It is designed to help utility staffs maintain static seals and minimize and trouble shoot leakage problems that can reduce plant availability.

1994-09-22T23:59:59.000Z

179

Wind Turbine Maintenance Guide  

Science Conference Proceedings (OSTI)

This guideline provides component-level information regarding the maintenance of major components associated with a wind turbine. It combines recommendations offered by major equipment manufacturers with lessons learned from owner/operators of wind turbine facilities.

2012-06-29T23:59:59.000Z

180

The levelized cost of energy for distributed PV : a parametric study.  

Science Conference Proceedings (OSTI)

The maturation of distributed solar PV as an energy source requires that the technology no longer compete on module efficiency and manufacturing cost ($/Wp) alone. Solar PV must yield sufficient energy (kWh) at a competitive cost (c/kWh) to justify its system investment and ongoing maintenance costs. These metrics vary as a function of system design and interactions between parameters, such as efficiency and area-related installation costs. The calculation of levelized cost of energy includes energy production and costs throughout the life of the system. The life of the system and its components, the rate at which performance degrades, and operation and maintenance requirements all affect the cost of energy. Cost of energy is also affected by project financing and incentives. In this paper, the impact of changes in parameters such as efficiency and in assumptions about operating and maintenance costs, degradation rate and system life, system design, and financing will be examined in the context of levelized cost of energy.

Goodrich, Alan C. (National Renewable Energy Laboratory); Cameron, Christopher P.

2010-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Advanced Electric Motor Predictive Maintenance Project  

Science Conference Proceedings (OSTI)

EPRI sponsored the three-year Advanced Electric Motor Predictive Maintenance (AEMPM) project in 2000 to increase the effectiveness of motor maintenance at a time when utilities were in a state of declining motor knowledge due to downsizing and restructuring. The project identified areas for improvement that were common to most utilities and selected appropriate measures to address these concerns. Areas addressed include documenting motor knowledge, increasing utility confidence in newer technologies and ...

2003-05-28T23:59:59.000Z

182

IEA Wind Task 26 - Multi-national Case Study of the Financial Cost of Wind Energy; Work Package 1 Final Report  

DOE Green Energy (OSTI)

The lifetime cost of wind energy is comprised of a number of components including the investment cost, operation and maintenance costs, financing costs, and annual energy production. Accurate representation of these cost streams is critical in estimating a wind plant's cost of energy. Some of these cost streams will vary over the life of a given project. From the outset of project development, investors in wind energy have relatively certain knowledge of the plant's lifetime cost of wind energy. This is because a wind energy project's installed costs and mean wind speed are known early on, and wind generation generally has low variable operation and maintenance costs, zero fuel cost, and no carbon emissions cost. Despite these inherent characteristics, there are wide variations in the cost of wind energy internationally, which is the focus of this report. Using a multinational case-study approach, this work seeks to understand the sources of wind energy cost differences among seven countries under International Energy Agency (IEA) Wind Task 26 - Cost of Wind Energy. The participating countries in this study include Denmark, Germany, the Netherlands, Spain, Sweden, Switzerland, and the United States. Due to data availability, onshore wind energy is the primary focus of this study, though a small sample of reported offshore cost data is also included.

Schwabe, P.; Lensink, S.; Hand, M.

2011-03-01T23:59:59.000Z

183

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Why O&M? 2 Why O&M? � 2.1 Introduction Effective O&M is one of the most cost-effective methods for ensuring reliability, safety, and energy efficiency. Inadequate maintenance of energy-using systems is a major cause of energy waste in both the Federal Government and the private sector. Energy losses from steam, water and air leaks, uninsulated lines, maladjusted or inoperable controls, and other losses from poor maintenance are often considerable. Good maintenance practices can generate substantial energy savings and should be considered a resource. Moreover, improvements to facility maintenance programs can often be accomplished immediately and at a relatively low cost. 2.2 Definitions Operations and Maintenance are the decisions and actions regarding the control and upkeep of

184

Categorical Exclusion for Maintenance Work  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Work Maintenance Work along the Electrical District 5 to Saguaro segment (41/4 to 58/5) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kV Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures (41/4-8, 4214, 43/6, 4417, 45/4,46/6,47/2,49/2,49/6,50/2,50/6,50/8,51/4, 52/3, 54/3, 5517, 56/1 57/1-3, 57/8 & 58/2-3), because the wood poles failed stability tests, cross arms are beyond

185

Nuclear Maintenance Applications Center: Guideline for Cooling Tower Inspection and Maintenance  

Science Conference Proceedings (OSTI)

Cooling tower structural failures have recently become a focus area for the nuclear industry based on events that have resulted in lost generation as well as high repair costs. Environmental concerns regarding thermal pollution and water usage have also recently increased the need for guidance for cooling tower inspection and maintenance.

2011-06-06T23:59:59.000Z

186

Recursive operation time maximization model for the maintenance of power generation equipment  

Science Conference Proceedings (OSTI)

Repairable equipment requires preventive maintenance (PM) to maintain proper function. An appropriate PM strategy can extend the life of equipment and reduce variable costs. A power generation company in Taiwan that has a fixed-period PM strategy is ... Keywords: Maintenance improvement factor, Mathematical programming, Preventive maintenance (PM)

Der-Chiang Li; Chiao-Wen Liu; Tung-Liang Chen

2012-05-01T23:59:59.000Z

187

Circuit Breaker Maintenance: Volume 2: Medium Voltage Circuit Breakers; Part 3: Westinghouse Types DH and DHP  

Science Conference Proceedings (OSTI)

This comprehensive guide will help utilities enhance and optimize maintenance of Westinghouse DH and DHP circuit breakers. It consolidates industry guidelines, applicable standards, original equipment manufacturer recommendations, and hands-on experience relative to these breakers. Optimized maintenance will increase reliability and reduce costs associated with corrective maintenance and equipment downtime.

1994-02-02T23:59:59.000Z

188

Operations and Maintenance Manual | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manual Manual Operations and Maintenance Manual October 16, 2013 - 5:00pm Addthis Closeout of the construction phase for renewable energy projects includes the creation of a comprehensive operations and maintenance (O&M) manual. Although specific content varies depending on the size, scope, and complexity of the project, the O&M manual typically includes manufacturer literature, basic operating procedures, troubleshooting techniques, measurement and verification (M&V) system documentation, and maintenance information. The general contractor should compile O&M documentation, gather as-built drawings for equipment and systems, and take the lead in organizing the manual. The commissioning agent reviews the manual to verify that it includes all necessary documentation, including:

189

Maintenance simulation: Software issues  

SciTech Connect

The maintenance of a distributed software system in a production environment involves: (1) maintaining software integrity, (2) maintaining and database integrity, (3) adding new features, and (4) adding new systems. These issues will be discussed in general: what they are and how they are handled. This paper will present our experience with a distributed resource management system that accounts for resources consumed, in real-time, on a network of heterogenous computers. The simulated environments to maintain this system will be presented relate to the four maintenance areas.

Luk, C.H.; Jette, M.A.

1995-07-01T23:59:59.000Z

190

Emission control cost-effectiveness of alternative-fuel vehicles  

DOE Green Energy (OSTI)

Although various legislation and regulations have been adopted to promote the use of alternative-fuel vehicles for curbing urban air pollution problems, there is a lack of systematic comparisons of emission control cost-effectiveness among various alternative-fuel vehicle types. In this paper, life-cycle emission reductions and life-cycle costs were estimated for passenger cars fueled with methanol, ethanol, liquefied petroleum gas, compressed natural gas, and electricity. Vehicle emission estimates included both exhaust and evaporative emissions for air pollutants of hydrocarbon, carbon monoxide, nitrogen oxides, and air-toxic pollutants of benzene, formaldehyde, 1,3-butadiene, and acetaldehyde. Vehicle life-cycle cost estimates accounted for vehicle purchase prices, vehicle life, fuel costs, and vehicle maintenance costs. Emission control cost-effectiveness presented in dollars per ton of emission reduction was calculated for each alternative-fuel vehicle types from the estimated vehicle life-cycle emission reductions and costs. Among various alternative-fuel vehicle types, compressed natural gas vehicles are the most cost-effective vehicle type in controlling vehicle emissions. Dedicated methanol vehicles are the next most cost-effective vehicle type. The cost-effectiveness of electric vehicles depends on improvements in electric vehicle battery technology. With low-cost, high-performance batteries, electric vehicles are more cost-effective than methanol, ethanol, and liquified petroleum gas vehicles.

Wang, Q. [Argonne National Lab., IL (United States); Sperling, D.; Olmstead, J. [California Univ., Davis, CA (United States). Inst. of Transportation Studies

1993-06-14T23:59:59.000Z

191

Advanced Remote Maintenance Design for Pilot-Scale Centrifugal Contactors  

Science Conference Proceedings (OSTI)

Advanced designs of used nuclear fuel recycling processes and radioactive waste treatment processes are expected to include more ambitious goals for aqueous based separations including; higher separations efficiency, high-level waste minimization, and a greater focus on continuous processes to minimize cost and footprint. Therefore, annular centrifugal contactors are destined to play a more important role for such future processing schemes. Pilot-scale testing will be an integral part of development of many of these processes. An advanced design for remote maintenance of pilot-scale centrifugal contactors has been developed and a prototype module fabricated and tested for a commercially available pilot-scale centrifugal contactor (CINC V-02, 5-cm rotor diameter). Advanced design features include air actuated clamps for holding the motor-rotor assembly in place, an integral electrical connection, upper flange o-rings, a welded bottom plate, a lifting bale, and guide pins. These design features will allow for rapid replacement of the motor rotor assembly, which can be accomplished while maintaining process equilibrium. Hydraulic testing of a three-stage prototype unit was also performed to verify that design changes did not impact performance of the centrifugal contactors. Details of the pilot-scale remote maintenance design, results of testing in a remote mockup test facility, and results of hydraulic testing of the advanced design are provided.

Jack Law; David Meikrantz; Troy Garn; Lawrence Macaluso

2011-02-01T23:59:59.000Z

192

Coal flow aids reduce coke plant operating costs and improve production rates  

Science Conference Proceedings (OSTI)

Chemical coal flow aids can provide many benefits to coke plants, including improved production rates, reduced maintenance and lower cleaning costs. This article discusses the mechanisms by which coal flow aids function and analyzes several successful case histories. 2 refs., 10 figs., 1 tab.

Bedard, R.A.; Bradacs, D.J.; Kluck, R.W.; Roe, D.C.; Ventresca, B.P.

2005-06-01T23:59:59.000Z

193

Predictive Maintenance Assessment Guidelines  

Science Conference Proceedings (OSTI)

This document is the third in a series of guidelines designed to help electric power utilities develop programs that take advantage of diagnostic technologies used to detect problems in machinery. The PDM Assessment Guidelines provide the procedures necessary to plan and implement a plant wide predictive maintenance program.

1997-12-02T23:59:59.000Z

194

CH Packaging Maintenance Manual  

SciTech Connect

This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests.

Washington TRU Solutions

2002-01-02T23:59:59.000Z

195

Lawn Maintenance Safety  

E-Print Network (OSTI)

Most homeowners do not consider lawn maintenance to be dangerous. However lawn mowers, trimmers, edgers and other power equipment can cause minor to severe burns and lacerations, broken and dislocated bones, eye injuries and loss of fingers, toes and legs. You can avoid accidents like these by following the safety guidelines in this publication.

Smith, David

2005-07-12T23:59:59.000Z

196

Preventive Maintenance Programs  

Science Conference Proceedings (OSTI)

...and specifications Operator, service, and repair manuals Lubricant type Filter specifications Wear components, especially material survey data Prior service and maintenance reports to identify problem Establish sampling and sample handling procedures Design and document sampling methods, such as in-live...

197

Web Recency Maintenance Protocol  

Science Conference Proceedings (OSTI)

In this paper, we propose a new protocol namely Web Recency Maintenance Protocol (WRMP) that employs "push" mechanism to maintain the currency of the World Wide Web (WWW) at Search Engine (SE) site. As of this writing SEs are adopting "pull" technology, ...

K. Satya Sai Prakash; S. V. Raghavan

2002-12-01T23:59:59.000Z

198

Historical plant cost and annual production expenses for selected electric plants, 1982  

SciTech Connect

This publication is a composite of the two prior publications, Hydroelectric Plant Construction Cost and Annual Production Expenses and Thermal-Electric Plant Construction Cost and Annual Production Expenses. Beginning in 1979, Thermal-Electric Plant Construction Cost and Annual Production Expenses contained information on both steam-electric and gas-turbine electric plant construction cost and annual production expenses. The summarized historical plant cost described under Historical Plant Cost in this report is the net cumulative-to-date actual outlays or expenditures for land, structures, and equipment to the utility. Historical plant cost is the initial investment in plant (cumulative to the date of initial commercial operation) plus the costs of all additions to the plant, less the value of retirements. Thus, historical plant cost includes expenditures made over several years, as modifications are made to the plant. Power Production Expenses is the reporting year's plant operation and maintenance expenses, including fuel expenses. These expenses do not include annual fixed charges on plant cost (capital costs) such as interest on debt, depreciation or amortization expenses, and taxes. Consequently, total production expenses and the derived unit costs are not the total cost of producing electric power at the various plants. This publication contains data on installed generating capacity, net generation, net capability, historical plant cost, production expenses, fuel consumption, physical and operating plant characteristics, and other relevant statistical information for selected plants.

1984-08-20T23:59:59.000Z

199

Maintenance Work Management -- Best Practices Guidelines: Maintenance Assessment and Improvement  

Science Conference Proceedings (OSTI)

This report on maintenance work management best practices is part of EPRI's Plant Maintenance Optimization (PMO) development efforts. Based on a series of assessment and improvement projects, the report describes the process and typical results.

1998-03-12T23:59:59.000Z

200

Nuclear Maintenance Applications Center: Heat Exchanger Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides plant personnel with information on the operation, maintenance, and performance of heat exchangers. The contents of this guide will assist plant personnel in improving heat exchanger reliability, performance, and maintenance practices.

2009-06-14T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Computerized Maintenance Management System and Maintenance Work Process Integration  

Science Conference Proceedings (OSTI)

A Computerized Maintenance Management System (CMMS) is an information and communication tool supporting the maintenance work process within an industrial plant. Though these types of systems are found in various industries, no report has existed describing CMMS integration within a utility environment. This guideline describes how to integrate a CMMS with the methods, procedures, work processes, and overall maintenance in a power plant.

1998-04-29T23:59:59.000Z

202

Integrated thermal and nonthermal treatment technology and subsystem cost sensitivity analysis  

SciTech Connect

The U.S. Department of Energy`s (DOE) Environmental Management Office of Science and Technology (EM-50) authorized studies on alternative systems for treating contact-handled DOE mixed low-level radioactive waste (MLLW). The on-going Integrated Thermal Treatment Systems` (ITTS) and the Integrated Nonthermal Treatment Systems` (INTS) studies satisfy this request. EM-50 further authorized supporting studies including this technology and subsystem cost sensitivity analysis. This analysis identifies areas where technology development could have the greatest impact on total life cycle system costs. These areas are determined by evaluating the sensitivity of system life cycle costs relative to changes in life cycle component or phase costs, subsystem costs, contingency allowance, facility capacity, operating life, and disposal costs. For all treatment systems, the most cost sensitive life cycle phase is the operations and maintenance phase and the most cost sensitive subsystem is the receiving and inspection/preparation subsystem. These conclusions were unchanged when the sensitivity analysis was repeated on a present value basis. Opportunity exists for technology development to reduce waste receiving and inspection/preparation costs by effectively minimizing labor costs, the major cost driver, within the maintenance and operations phase of the life cycle.

Harvego, L.A.; Schafer, J.J.

1997-02-01T23:59:59.000Z

203

Surveillance and Maintenance Plan for the ORNL Decontamination and Decommissioning Program FY 1993--2002  

Science Conference Proceedings (OSTI)

The Decontamination and Decommissioning (D D) Program at the Oak Ridge National Laboratory (ORNL) is part of the Department of Energy (DOE) Environmental Restoration D D program. The purpose and objectivesof this program include: (1) surveillance and maintenance (S M) of facilities awaiting decommissioning; (2) planning for the orderly decommissioning of these facilities; and (3) implementation of a program to accomplish facility disposition in a safe, cost-effective, and timely manner. Participating D D contractors are required to prepare formal plans that document the S M programs established for each site. This report has been prepared to provide this documentation for those facilities included in the ORNL D D Program.

Ford, M.K.; Holder, L. Jr.

1992-07-01T23:59:59.000Z

204

care and maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Care and Maintenance of the Prairie Parcel Care and Maintenance of the Prairie Parcel Now that your prairie parcel is up and growing, there are just a few concerns that you should consider about its care. Weeding The question of weeding is really just a matter of aesthetics. You do not have to weed your parcel. If your parcel is a large one, weeding may not even be practical. Although the "weed" species will dominate your parcel for the first few years, they will give way to the native plant species. You can liken the native plants to long distance runners; they appear to start off slowly, but end up winning the ecological race. After all, they are the plants that are genetically-suited and adapted to growing in this environment. The native prairie plants will be developing extensive root structure the

205

HVAC Maintenance and Technologies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC - HVAC - Maintenance and Technologies Federal Utility Partnership Working Group Meeting Providence, Rhode Island April 15, 2010 BY Ramin Faramarzi, P.E. Technology Test Centers (TTC) Design and Engineering Services Southern California Edison (SCE) www.sce.com/rttc 2 Outline * Introduction to SCE's TTC * Overview of energy challenges in California (CA) * Role of HVAC in CA's energy and demand equations * Factors affecting HVAC performance * Focus on SCE's research on maintenance faults * Next generation of HVAC equipment * HVAC technologies on SCE's TTC radar * Black boxes - do they all work? 3 SCE's Technology Test Centers * SCE applied research facilities located in Irwindale, CA comprised of 3 test beds: * Refrigeration * HVAC * Lighting * Coming Soon! - A new ZNE lab 4 Refrigeration Testing

206

Main Generator Rotor Maintenance  

Science Conference Proceedings (OSTI)

Main generator rotors are constructed and designed to provide decades of reliable and trouble-free operation. However, a number of incidences have occurred over the years that can adversely impact reliable operation of generator rotors and, ultimately, production of electrical power. This report is a guide for power plant personnel responsible for reliable operation and maintenance of main generators. As a guide, this report provides knowledge and experience from generator experts working at power plants...

2006-11-27T23:59:59.000Z

207

Reactive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reactive Maintenance Reactive Maintenance Reactive Maintenance October 7, 2013 - 9:40am Addthis Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities. Advantages Reactive maintenance advantages are a double-edged sword. Federal agencies following a purely reactive maintenance strategy can expect little expenditures for manpower or system upkeep until something breaks. However, systems do break. With new equipment, Federal agencies can expect minimal incidents of failure. However, older equipment often experiences higher failure incidents and costlier repairs. Other advantages of reactive maintenance are:

208

Maintenance FUSION IGNITION RESEARCH EXPERIMENT  

E-Print Network (OSTI)

to refine the system details, interfaces and the requirements for remote handling. Table 1. FIRE RadialInsulation Enclosure Remote Maintenance Module FUSION IGNITION RESEARCH EXPERIMENT SYSTEM objectives and subsystem requirements in an arrangement that allows remote maintenance of in

209

Preventive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preventive Maintenance Preventive Maintenance Preventive Maintenance October 7, 2013 - 9:44am Addthis Preventive maintenance aims to sustain or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time. Advantages Federal agencies can greatly extend equipment reliability and lifespan by expending the necessary resources for regular maintenance. In most cases, the system designer or manufacturer outlines regular maintenance under a preventive strategy. In addition to increased reliability and lifespan, budget is saved over the life of the system. Preventive maintenance programs can save as much as 12% to 18% in equipment repair and replacement. Other advantages of preventitive maintenance are:

210

Operations and Maintenance Program Measurement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Program Measurement Operations and Maintenance Program Measurement Operations and Maintenance Program Measurement October 4, 2013 - 5:19pm Addthis Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a successful O&M program. O&M managers must think beyond reliability. Successful programs incorporate reliability along with controlling costs, evaluating and implementing new technologies, tracking and reporting health and safety issues, and more. Not only are these metrics useful in assessing effectiveness, but also in equipment cost justification, program modifications, and staff hiring. Common Metrics The following metrics are common in evaluating effective O&M programs. Not

211

Requirements-Based Surveillance and Maintenance Review Guide | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Use of the Guidance Manual This manual was developed to provide organizations with the knowledge and tools necessary to perform a disciplined and thorough Requirements-Based Surveillance and Maintenance (RBSM) review at any given facility or site in order to cost effectively manage S&M activities. Sections 1.0, 2.0 and 3.0 of this manual provide a brief explanation of what the RBSM review process is, why such a process is needed and the steps a facility or site should take to get organized and initiate an RBSM review. Sections 4.0 and 5.0 of this manual discuss the use of the data gained from the RBSM review process like the development of cost reduction strategies and the development of

212

Transmission Structure Design Features to Facilitate Construction and Maintenance  

Science Conference Proceedings (OSTI)

The power industry wants to construct reliable and cost-effective overhead lines. A reliable and cost-effective line requires not only that the line and structures meet design criteria for strength, clearances, and electrical considerations, but also that it can be constructed and maintained easily and safely. Design and construction practices should therefore go hand in hand. A minor change in design could have a large impact on construction and maintenance costs. The various departments within a ...

2013-11-18T23:59:59.000Z

213

Nuclear Maintenance Applications Center: Passive Component Maintenance Guide for Nuclear Power Plant Personnel  

Science Conference Proceedings (OSTI)

The information contained in this report represents a significant collection of technical and human performance information, including techniques and good practices, related to the design, maintenance, and operation of passive components common at most domestic nuclear power plants. Assemblage of this information provides a single point of reference for plant engineering and maintenance personnel, both in the present and in the future. Through the use of this guideline, in close conjunction with the indu...

2011-11-16T23:59:59.000Z

214

Do-It-Now building maintenance reengineering project  

Science Conference Proceedings (OSTI)

The Do-It-Now (DIN) building maintenance system is proposed to reduce the cost of routine building maintenance and repairs and to improve customer satisfaction with maintenance services. DIN uses a team approach to periodically inspect buildings and provide maintenance services on the spot. It emphasizes communications between the customers and the craftspeople performing the work. The system was designed using a reengineering approach that characterized the existing maintenance work control system, analyzed comparable systems in other DOE laboratories, envisioned an ideal system, and proposed a workable, testable system for initial implementation. At each stage, input was solicited from customer representatives and Facilities management to ensure meeting customer requirements with an implementable system.

Apoddaca, L.; Ayotte, A.; Coffman, J.; Dukes, L.; Jojola, S.; Kadlec, J.; Letourneau, S.; Matthews, R.; Paul, G.

1996-09-01T23:59:59.000Z

215

Predictive Maintenance Program Implementation Experience  

Science Conference Proceedings (OSTI)

Predictive maintenance (PDM) is a process of collecting data, assessing machinery condition, and deciding when to perform maintenance. PDM saves money and improves machinery reliability as compared to preventive or corrective maintenance. This report describes the implementation of PDM programs at Commonwealth Edison's (ComEd's) fossil power plants.

1998-12-29T23:59:59.000Z

216

Proactive maintenance initiatives at Argonne National Laboratory-West  

SciTech Connect

In the late 1980`s, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ``mentor`` roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I&C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned.

Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

1995-06-01T23:59:59.000Z

217

H2A Delivery: Miscellaneous Cost and H2 Losses  

NLE Websites -- All DOE Office Websites (Extended Search)

* Reviewed primarily to ensure that proper annual maintenance and repair costs for compressor - New value allowed longer compressor lifetime Forecourt Item New Old Notes...

218

EIA - Updated Capital Cost Estimates for Electricity Generation Plants  

U.S. Energy Information Administration (EIA)

Almost all of these factors can vary by region, as do capacity factors for renewable generation, operations and maintenance costs associated with individual ...

219

Design of a maintenance and operations recommender  

E-Print Network (OSTI)

from computerized maintenance management systems (CMMS)use computerized maintenance management systems (CMMS) andmanagement and control systems (EMCS) to recom- mend what maintenance

Federspiel, C.; Villafana, L.

2003-01-01T23:59:59.000Z

220

HVAC Maintenance and Technologies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC Maintenance and Technologies HVAC Maintenance and Technologies Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility...

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Utilities are doing too much breaker maintenance  

Science Conference Proceedings (OSTI)

Many breaker failures occur after the breaker has been torn down for maintenance because some error was made in reassembling it. Utilities now can get a better understanding of circuit breaker reliability as the result of a worldwide survey conducted by the International Conference on Large High-Voltage Electric Systems (Cigre) of the reliability of circuit breakers 63 kV and above. The most significant finding is that the rate of major failures have dropped drastically with the introduction of modern SF[sub 6] breakers (from 1.58 to 0.67 per 100 breaker-years). But the rate of minor failures - such as gas leaks, which require maintenance and add to the operating cost - has increased by 30%. Incorrect maintenance causes far fewer failures in modern breakers, simply because they have to be torn down less frequently. Only 15% as many major failures and 77% as many minor failures can be attributed to incorrect maintenance. The failure to open or close on command are still the dominant major-failure modes of circuit breakers. 4 tabs.

Heising, C. (Reliability Consultant, Wynnewood, PA (United States))

1994-12-01T23:59:59.000Z

222

Effective Steam Trap Selection/Maintenance - Its Payback  

E-Print Network (OSTI)

In oil refineries and petrochemical plants large number of steam traps are used to discharge condensate from steam mains, tracers and process equipment. Early efforts on steam traps focused almost exclusively on their selection and sizing, and it was not until the 1973 oil embargo that a need for regular maintenance became recognized. Although relatively small pieces of equipment, traps are responsible for large quantities of steam losses, decreased equipment efficiency and high maintenance costs; e.g., a steam trap leaking 100 psig steam through a 1/8 inch orifice costs at least $2k/yr if steam is valued at $5/k lb. Typically, a steam trap survey identifies 20-60% of traps malfunctioning. Therefore, establishing an effective steam trap selection/maintenance program is not simple but can be extremely profitable. This paper will show how a successful checking/maintenance program can result in high returns by using a case study at an Exxon plant. The example also shows how a central engineering organization can interact with plant technicians/ maintenance personnel to help implement an effective steam trap maintenance program at competitive costs and high returns.

Garcia, E.

1984-01-01T23:59:59.000Z

223

GUIDE TO NUCLEAR POWER COST EVALUATION. VOLUME 4. FUEL CYCLE COSTS  

SciTech Connect

Information on fuel cycle cost is presented. Topics covered include: nuclear fuel, fuel management, fuel cost, fissionable material cost, use charge, conversion and fabrication costs, processing cost, and shipping cost. (M.C.G.)

1962-03-15T23:59:59.000Z

224

OOTW COST TOOLS  

Science Conference Proceedings (OSTI)

This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

HARTLEY, D.S.III; PACKARD, S.L.

1998-09-01T23:59:59.000Z

225

US nuclear power plant operating cost and experience summaries  

Science Conference Proceedings (OSTI)

NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

Kohn, W.E.; Reid, R.L.; White, V.S.

1998-02-01T23:59:59.000Z

226

Davis PV plant operation and maintenance manual  

DOE Green Energy (OSTI)

This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

NONE

1994-09-01T23:59:59.000Z

227

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Activity HEV Fleet Testing Date Mileage Description Cost 11212012 1,582 Replaced one tire due to road hazard 201.66 12102012 4,291 Replaced brake line - under warranty NC 3...

228

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Cost 6212012 2,583 Reprogrammed VCM, TCU, and Battery Control Unit - under warranty NC 362013 14,548 Replaced one tire 128.81 3262013 15,250 Rotated tires 20.00...

229

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing Activity HEV Fleet Testing Date Mileage Description Cost 842009 5,752 Changed oil and filter 28.25 8192009 10,414 Changed oil and filter and checked all fluids,...

230

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing Activity HEV Fleet Testing Date Mileage Description Cost 1142010 6,330 Changed oil and filter and inspected brake system 46.83 2112010 12,302 Changed oil and filter...

231

Operation and Maintenance Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

and cost-effective is the first step to obtaining energy-efficient building performance. An O&M assessment provides a systematic look at all aspects of the current O&M...

232

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

HEV Fleet Testing Date Mileage Description Cost 2112013 4,365 Replaced battery cooling fan - under warranty NC 3252013 8,487 Changed oil - under warranty NC 3262013 8,684...

233

The feasibility of replacing or upgrading utility distribution transformers during routine maintenance  

SciTech Connect

It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

1995-04-01T23:59:59.000Z

234

Opportune maintenance and predictive maintenance decision support douard Thomas, ric Levrat, Benoit Iung, Pierre Cocheteux  

E-Print Network (OSTI)

to several ones. Keywords: Predictive maintenance, Maintenance engineering, Decision making, Complex systems be answered by using maintenance engineering, and more specifically a computerised maintenance management system that collects the information related to the different maintenance actions. Finally the second

Paris-Sud XI, Université de

235

Federal Energy Management Program: Maintenance Types  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Types Maintenance Types to someone by E-mail Share Federal Energy Management Program: Maintenance Types on Facebook Tweet about Federal Energy Management Program: Maintenance Types on Twitter Bookmark Federal Energy Management Program: Maintenance Types on Google Bookmark Federal Energy Management Program: Maintenance Types on Delicious Rank Federal Energy Management Program: Maintenance Types on Digg Find More places to share Federal Energy Management Program: Maintenance Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources Contacts

236

Software maintenance maturity model (smmm): the software maintenance process model  

E-Print Network (OSTI)

This paper summarizes the research work leading to a Phd thesis that addresses the assessment and improvement of the software maintenance function by proposing a maturity model for daily software maintenance activities: Software Maintenance Maturity Model (SM mm) as well as its supporting knowledge based system SM Xpert. The software maintenance function suffers from a scarcity of management models to facilitate its evaluation, management, and continuous improvement. The SM mm addresses the unique activities of software maintenance while preserving a structure similar to that of the CMMi ©1 maturity model. It is designed to be used as a complement to this model. The SM mm is based on practitioners ’ experience, international standards, and the seminal literature on software maintenance. This paper presents the model’s purpose, scope, foundation, and architecture, followed by a knowledgebased system to help software maintainers learn and use the maturity model. 1.

Alain April; Jean-marc Desharnais

2005-01-01T23:59:59.000Z

237

Generation Maintenance Applications Center: Conventional Vertical Pump Maintenance Guide  

Science Conference Proceedings (OSTI)

Vertical pumps are used in several applications in power plants, such as condensate, heater drain, circulating water, and service water/river water applications.BackgroundThe Maintenance Issue Surveys of the Electric Power Research Institute (EPRI) Generation Maintenance Applications Center (GenMAC) indicate that members are experiencing difficulties with various maintenance issues associated with vertical pumps. Some of the problems identified a need for ...

2013-12-19T23:59:59.000Z

238

Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC  

DOE Green Energy (OSTI)

Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

Not Available

1980-09-01T23:59:59.000Z

239

SunShot Initiative: Reducing Non-Hardware Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Reducing Non-Hardware Costs Reducing Non-Hardware Costs DOE supports efforts to dramatically reduce the non-hardware, balance of systems costs associated with solar energy systems. Representing as much as 64% of the total installed system price, these "soft costs" include: Customer Acquisition Financing and Contracting Permitting, Interconnection, and Inspection Installation and Performance Operations and Maintenance. To meet SunShot goals, the industry must innovate new ways to automate and speed processes that make it easier for consumers, businesses, utilities, solar companies, and others to install solar projects. For example, novel software solutions now allow solar companies to design systems and provide accurate quotes using satellite images rather than conducting full site visits.

240

EUVL reticle factory model and reticle cost analysis  

SciTech Connect

The key issues in reticle manufacturing are cost and delivery time, both of which are dependent upon the yield of the process line. To estimate the cost and delivery time for EUVL reticles in commercial manufacturing, we have developed the first model for an EUV reticle factory which includes all the tools required for a presumed EUVL reticle fabrication process. This model includes the building, support tools and sufficient ``in-line`` process tools for the manufacture of (more than) 2500 reticles per year. Industry specifications for the tool performance are used to determine the number of tools required per process step and the average number of reticles fabricated per year. Building and capital equipment depreciation costs, tool installation costs, tool maintenance costs, labor, clean room costs, process times and process yields are estimated and used to calculate the yearly operating cost of the reticle factory and the average reticle fabrication cost. We estimate the sales price of an EUV reticle to be $60K for non-critical levels and $120K for ``leading-edge.`` The average reticle fabrication time is calculated for three different process-line yields.

Hawryluk, A.M. [Lawrence Livermore National Lab., CA (United States); Shelden, G. [SEMATECH, Austin, TX (United States); Troccolo, P. [Intel Corp., Santa Clara, CA (United States)

1996-05-22T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle SYNTHESIS ON CONSTRUCTION UNIT COST  

E-Print Network (OSTI)

Availability of historical unit cost data is an important factor in developing accurate project cost estimates. State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, material costs, and equipment costs, including contractor overhead and profit. The goal of this synthesis is to identify how state highway agencies develop unit prices for construction and maintenance projects. The synthesis approach consists of a comprehensive online survey, covering every aspect of unit cost development, to identify the state of practice in state highway agencies and interviews with several representative SHAs to gain a better understanding of the practices followed for unit cost development. This study finds that even though SHAs collect and store historical cost data, they do not have a formal and documented process for adjusting unit costs for project characteristics and market conditions. 17. Key Words

Stuart Anderson; Ivan Damnjanovic; Ali Nejat; Sushanth Ramesh

2007-01-01T23:59:59.000Z

242

Sustainability of green space maintenance  

E-Print Network (OSTI)

In Japan, recent changes in socio-economic and political structures -- decreasing tax revenue, declining communication among community members, and privatization of public services-- have influenced existing maintenance ...

Nomura, Wataru

2011-01-01T23:59:59.000Z

243

Practical Maintenance of Digital Systems: Guidance to Maximize the Benefits of Digital Technology for the Maintenance of Digital Sys tems and Plant Equipment  

Science Conference Proceedings (OSTI)

For operators to take maximum advantage of digital technology being implemented in nuclear power plants, they must reduce the cost and likelihood of human errors in maintenance and testing of new digital systems and human-system interfaces (HSIs). Designing for maintenance and testing is a fundamental part of the design effort for any plant system -- and digital upgrade modifications are no exception. This report provides guidance for plant operators and designers for achieving cost-effective maintainabi...

2004-10-11T23:59:59.000Z

244

Reliability-Centered Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability-Centered Maintenance Reliability-Centered Maintenance Reliability-Centered Maintenance October 7, 2013 - 9:48am Addthis Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance. The difference is that reliability-centered maintenance recognizes that: Equipment design and operations differ Different equipment has different probabilities of failure All equipment is not of equal importance to facility operations Facilities have limited financial and personnel resources. While reliability-centered maintenance relies on predictive maintenance practices and technologies, it also recognizes that maintenance on inexpensive and/or unimportant equipment may be better served by a reactive or predictive maintenance approach. Each of the aforementioned factors are

245

Federal Energy Management Program: Reactive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Reactive Reactive Maintenance to someone by E-mail Share Federal Energy Management Program: Reactive Maintenance on Facebook Tweet about Federal Energy Management Program: Reactive Maintenance on Twitter Bookmark Federal Energy Management Program: Reactive Maintenance on Google Bookmark Federal Energy Management Program: Reactive Maintenance on Delicious Rank Federal Energy Management Program: Reactive Maintenance on Digg Find More places to share Federal Energy Management Program: Reactive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

246

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance on Google Bookmark Federal Energy Management Program: Operations and Maintenance on Delicious Rank Federal Energy Management Program: Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources

247

Federal Energy Management Program: Preventive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Preventive Preventive Maintenance to someone by E-mail Share Federal Energy Management Program: Preventive Maintenance on Facebook Tweet about Federal Energy Management Program: Preventive Maintenance on Twitter Bookmark Federal Energy Management Program: Preventive Maintenance on Google Bookmark Federal Energy Management Program: Preventive Maintenance on Delicious Rank Federal Energy Management Program: Preventive Maintenance on Digg Find More places to share Federal Energy Management Program: Preventive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

248

Nuclear Maintenance Applications Center: Reactor Recirculation Pump Seal Maintenance Guide  

Science Conference Proceedings (OSTI)

In 1993, the Electric Power Research Institute (EPRI) published Main Coolant Pump Seal Maintenance Guide (report TR-100855). That report provides guidance on maintenance and troubleshooting of main coolant pump seals but was generic in naturethe information was relevant to pressurized water reactors (PWRs) and boiling water reactors (BWRs).

2008-12-18T23:59:59.000Z

249

Nuclear Maintenance Applications Center: Emergency Diesel Generator Condition- Based Maintenance  

Science Conference Proceedings (OSTI)

Condition-based maintenance practices that were developed in the United States in the 1990s for emergency diesel generators (EDGs) have not been fully adopted by international nuclear plant operators. To encourage broader use of such practices, NMAC formed a technical advisory group of international utilities interested in learning more about condition-based EDG maintenance practices.

2008-12-19T23:59:59.000Z

250

Nuclear Maintenance Application Center: Characterizing International Maintenance Practices  

Science Conference Proceedings (OSTI)

In 1987, the Electric Power Research Institute (EPRI) published report NP-5185-SR, Maintenance of European Nuclear Power Plants. The project comprised visits to six plant sites in six European countries over a two-week period and reported on the state of the various maintenance processes and programs in use at each location.

2012-08-07T23:59:59.000Z

251

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft July 9, 2009 Draft July 9, 2009 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2009 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

252

Federal Requirements for Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations & Maintenance » Federal Requirements Operations & Maintenance » Federal Requirements for Operations and Maintenance Federal Requirements for Operations and Maintenance October 4, 2013 - 5:09pm Addthis The following laws and regulations set advanced metering and measurement requirements for Federal agencies. Energy Policy Act (EPAct) of 2005: Requires all Federal buildings to be metered by October 1, 2012, to ensure efficient energy use and reduce the cost of electricity used in Federal facilities. Advanced meters or metering devices must provide data at least daily and measure the consumption of electricity at least hourly. These devices must be used to the maximum extent practical. Requires Federal agencies to submit to the U.S. Department of Energy (DOE) an implementation plan identifying personnel responsible for achieving

253

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final July 01, 2010 Final July 01, 2010 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2010 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

254

Achieving world class maintenance status  

Science Conference Proceedings (OSTI)

The article written by a management consultant, discusses the art of successful planning and operation of maintenance in mines considering factors such as benchmaking, key performance indices (KPIs) and frequency of procedures which can help achieve 'world class maintenance'. 1 fig.

Tomlingson, P.D. [Paul D. Tomingson Associates (United States)

2007-08-15T23:59:59.000Z

255

Maintenance cost studies of rotary wing commercial transport aircraft  

E-Print Network (OSTI)

Introduction: The vertical take-off and landing (VTOL) aircraft market has had substantial growth in the period of the last ten years when one considers the overall number of aircraft in use. The military fleet has continued ...

Ausrotas, Raymond A.

1974-01-01T23:59:59.000Z

256

Managing maintenance costs of pharmaceutical research and development  

E-Print Network (OSTI)

Drug Discovery is a race to be the first to patent a drug that meets a significant medical need in the world. Many pharmaceutical companies are now using automation extensively to improve consistency and aid personnel in ...

Butts, Jared (Jared C.)

2009-01-01T23:59:59.000Z

257

OpenEI Community - Maintenance  

Open Energy Info (EERE)

maintenance maintenance March 8-9, 2013 http://en.openei.org/community/blog/openei-maintenance-march-8-9-2013  We would like to inform the OpenEI community that OpenEI will be undergoing a significant software upgrade during a maintenance window this weekend.  We will be upgrading the wiki and semantic mediawiki portions of OpenEI, which means /datasets, /apps, /lod, /sparql and /community will continue to function normally.  Additionally, web services that rely on Ask queries (utility rate database API) may have some downtime as we transition.maintenance-march-8-9-2013" target="_blank">read more

258

Turbine-Generator Maintenance Interval Optimization Using a Financial Risk Assessment Technique  

Science Conference Proceedings (OSTI)

Turbine-generator (T-G) maintenance interval selection is evolving from a time-based and reliability-centered approach to an approach based on financial risk. The new financial-based decision methods seek to reduce each unit's maintenance costs to the lowest level consistent with safe operation, while balancing operations and maintenance (O&M) expenditures optimally over the entire plant or system. EPRI's Turbo-X software provides a powerful planning tool for engineers to evaluate specific proposals for ...

2000-11-21T23:59:59.000Z

259

Catalogue and Assessment of Industry Maintenance Best Practices for Substation Equipment  

Science Conference Proceedings (OSTI)

Utilities have been maintaining substation equipment reliably since the industry's inception, but now many are facing increased challenges to reduce operating and maintenance costs without adversely affecting service levels. In this setting, utilities may benefit from knowing what programs and techniques their peers have implemented. To that end, EPRI conducted a series of industry surveys assessing key substation equipment maintenance practices. As utilities consider modifying their maintenance programs...

2011-12-21T23:59:59.000Z

260

Streamlined Reliability-Centered Maintenance (SRCM) Program for Fossil-Fired Power Plants  

Science Conference Proceedings (OSTI)

Following EPRI's philosophy to use and expand existing technology if it makes economic sense, the Institute's Plant Maintenance Optimization Target has adopted a reliability-centered maintenance (RCM) process called Streamlined RCM, or SRCM. SRCM provides a utility a cost-effective process to determine the optimum maintenance strategy for plant systems and equipment based on importance to business objectives. SRCM maintains all the basic steps of traditional RCM.

1998-03-25T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

Timely and proper execution of operation and maintenance (O&M) activities may be a key factor in ensuring the successful function of selective catalytic reduction (SCR) systems. This report serves as the 2012 update of EPRI’s Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems, originally published in 2001 and updated annually. New and revised content this year includes: 1) recent developments in in situ NOx analyzers, including a ...

2012-12-05T23:59:59.000Z

262

Federal Energy Management Program: Predictive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

to someone by E-mail to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance on Facebook Tweet about Federal Energy Management Program: Predictive Maintenance on Twitter Bookmark Federal Energy Management Program: Predictive Maintenance on Google Bookmark Federal Energy Management Program: Predictive Maintenance on Delicious Rank Federal Energy Management Program: Predictive Maintenance on Digg Find More places to share Federal Energy Management Program: Predictive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources

263

Institute for Software Technology Maintenance Proze  

E-Print Network (OSTI)

Maintenance Institute for Software Technology Ersatz es bestehenden Systems Idee: Maintenance ist teuer. Durch! #12;VU Software Maintenance Institute for Software Technology Fehler im neuen System Software ist Management berücksichtigt Maintenance-Ziele und Rahmenbedingungen VU Software Maintenance Institute

264

A Comparison of Canadian and U.S. Hydro Operations and Maintenance Practices  

Science Conference Proceedings (OSTI)

Phase 1 of the Comparison of Canadian & American Hydro Operations & Maintenance Practices project indicates that hydroelectric plants in Canada have significantly lower operations and maintenance (O&M) costs than those in the United States. Phase 2, focused on a more in-depth investigation, will begin as soon as permission is granted by the respective plant owners.

1997-12-22T23:59:59.000Z

265

A model-based approach for data integration to improve maintenance management by mixed reality  

Science Conference Proceedings (OSTI)

Facilitating interaction with maintenance systems through intuitive interfaces is a competitive advantage in terms of time and costs for industry. This work presents the CARMMI approach, which aims to integrate information coming from CAx tools, mixed/augmented ... Keywords: Data modeling/visualization, Industrial maintenance, Mixed reality, Product data management

DanúBia Bueno EspíNdola; Luca Fumagalli; Marco Garetti; Carlos E. Pereira; Silvia S. C. Botelho; Renato Ventura Henriques

2013-05-01T23:59:59.000Z

266

So how much will it cost to build a nuke?  

SciTech Connect

Trying to get a better understanding of the different estimates of the cost of nuclear power, Prof. Francois Leveque of Mines ParisTech and Marcelo Saguan of Microeconomix examined seven studies published since 2000. They examined levelized cost, which captures the cost of electricity generation from nuclear reactors over the entire life cycle, including initial investment costs, operations and maintenance costs, cost of fuel, cost of capital, and decommissioning. The results, in 2007 euro/MWh, vary from 18 to 80. Making matters worse, more recent studies show an upward trend: the average value for studies published in 2003--05 is about 43 euro/MWh, while those published in 2007--09 average 63 euro2007/MWh. One reason for the different results is different assumptions about the main cost drivers and how they may vary over time. With the advent of third-generation nuclear reactors, numbers in the range of $1,000/kW (approx. 750 euro/kW) were being tossed around, suggesting a $1 billion investment for a 1,000 MW plant. A 2003 MIT study assumed an overnight cost of 1,750 euro/kW, with later studies raising the numbers to 3,000 euro/kW (approx. US$ 4,500). In 2008, Progress Energy Florida put the price tag for 2 new reactors it is planning to build on the Gulf Coast of Florida at $14 billion with another $3 billion for transmission and related expenses. Likewise, Florida Power & Light figures it would cost $20 billion for 2 new reactors at its Turkey Point site in Florida. These higher cost estimates and significant uncertainties about the true costs pose serious challenges to the competitiveness of nuclear power.

NONE

2010-01-15T23:59:59.000Z

267

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)  

Science Conference Proceedings (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

268

Outsourcing transportation infrastructure maintenance : a theoretical approach with application to JR East  

E-Print Network (OSTI)

In transportation agencies, how to reduce maintenance and operation cost is one of the biggest and most common concerns, because their revenue is not expected to increase drastically in the future. One of the solutions ...

Hirano, Jun, 1974-

2004-01-01T23:59:59.000Z

269

Nuclear Maintenance Applications Center: Maintenance Engineer Fundamentals Handbook  

Science Conference Proceedings (OSTI)

Power plant engineering is a specialized form of engineering not usually taught in universities. In an effort to provide degreed mechanical, electrical, chemical, civil, and nuclear engineers and maintenance specialists the practical information needed to quickly become effective plant engineers, the Electric Power Research Institute (EPRI) developed the Maintenance Engineer Fundamentals Handbook: An EPRI Course (TR-106853) and corresponding training course in 1996. As the retirement rate of today's hig...

2007-12-20T23:59:59.000Z

270

Nuclear Maintenance Applications Center: Preventive Maintenance Program Guideline  

Science Conference Proceedings (OSTI)

Over the years, the Electric Power Research Institute (EPRI) has developed many technical documents to aid in developing effective preventive, predictive, and condition monitoring maintenance programs to ensure equipment reliability and availability. The industry has drawn on this information to establish or enhance preventive maintenance (PM) programs. However, not all PM program processes have been implemented, leaving some programs marginally effective and vulnerable to failure. The purpose of this re...

2011-07-11T23:59:59.000Z

271

Nuclear Maintenance Applications Center: Crane Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

This report is an update to the original guideline, published in December 2000 as Electric Power Research Institute (EPRI) report 1000986, and supersedes it in its entirety. This updated guide provides technical, maintenance, operational, training, inspection, and troubleshooting information for overhead bridge cranes used in nuclear power plants. Individual utilities can use this guide as a reference document that provides detailed component information, in-depth overhead bridge crane maintenance practi...

2011-03-07T23:59:59.000Z

272

Evaluation of the Total Cost of Ownership of Fuel Cell-Powered Material Handling Equipment  

SciTech Connect

This report discusses an analysis of the total cost of ownership of fuel cell-powered and traditional battery-powered material handling equipment (MHE, or more typically 'forklifts'). A number of fuel cell MHE deployments have received funding support from the federal government. Using data from these government co-funded deployments, DOE's National Renewable Energy Laboratory (NREL) has been evaluating the performance of fuel cells in material handling applications. NREL has assessed the total cost of ownership of fuel cell MHE and compared it to the cost of ownership of traditional battery-powered MHE. As part of its cost of ownership assessment, NREL looked at a range of costs associated with MHE operation, including the capital costs of battery and fuel cell systems, the cost of supporting infrastructure, maintenance costs, warehouse space costs, and labor costs. Considering all these costs, NREL found that fuel cell MHE can have a lower overall cost of ownership than comparable battery-powered MHE.

Ramsden, T.

2013-04-01T23:59:59.000Z

273

Predictive Maintenance Primer: Revision to NP-7205  

Science Conference Proceedings (OSTI)

The "Predictive Maintenance Primer" revision provides nuclear plant personnel with current information regarding the predictive maintenance technologies and their applications. This guide will assist a plant in improving its predictive maintenance program.

2003-11-06T23:59:59.000Z

274

Optimal scheduling of fighter aircraft maintenance  

E-Print Network (OSTI)

The effective scheduling of fighter aircraft maintenance in the Air Force is crucial to overall mission accomplishment. An effective maintenance scheduling policy maximizes the use of maintenance resources and aircraft ...

Cho, Philip Y

2011-01-01T23:59:59.000Z

275

Robust Maintenance Policies in Asset Management  

E-Print Network (OSTI)

Optimal Maintenance and Repair Policies in Asset ManagementROBUST MAINTENANCE POLICIES IN ASSET MANAGEMENT Kenneth D.management policies and shows how the proposed approach may reduce maintenance and

Kuhn, Kenneth D.; Madanat, Samer M.

2005-01-01T23:59:59.000Z

276

An Outlook on Truth Maintenance  

E-Print Network (OSTI)

Truth maintenance systems have been used in several recent problem solving systems to record justifications for deduced assertions, to track down the assumptions which underlie contradictions when they arise, and to ...

McAllester, David A.

1980-08-01T23:59:59.000Z

277

Maintenance of DOE Technical Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TECHNICAL STANDARDS TECHNICAL STANDARDS PROGRAM PROCEDURES DOE-TSPP-9 Revision: 5 Date: August 1, 2000 MAINTENANCE OF DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-9 Maintenance Revision: 5 Date: August 1, 2000 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1

278

Condition-Based Maintenance Guideline  

Science Conference Proceedings (OSTI)

Since the 1980s, EPRI has published various documents relating to predictive or condition-based maintenance (CBM) programs. These documents have served as a foundation for predictive maintenance programs within our industry. Many of these published documents are now more than 10 years old. As a result, EPRI is reviewing these documents to compare them with current practices and programs. EPRIs initial goal is to revise and update the guidance and create a principal core document on predictive and conditi...

2011-11-16T23:59:59.000Z

279

honda accord maintenance sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

10242005 38,262 Changed oil, rotated tires 28.44 12132005 48,397 Purchased spare tire not included with the vehicle 206.03 12192005 49,472 45K service 234.53 1132006...

280

Federal Energy Management Program: Computerized Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Computerized Maintenance Management Systems to someone by E-mail Share Federal Energy Management Program: Computerized Maintenance Management Systems on Facebook Tweet about Federal Energy Management Program: Computerized Maintenance Management Systems on Twitter Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Google Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Delicious Rank Federal Energy Management Program: Computerized Maintenance Management Systems on Digg Find More places to share Federal Energy Management Program: Computerized Maintenance Management Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Program Management to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Management on Facebook Tweet about...

282

Federal Energy Management Program: Computerized Maintenance Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Maintenance Management Systems Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and...

283

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Find out about effective metering at Federal facilities Computerized Maintenance Management Systems: Learn about the evaluation and integration of these systems Maintenance...

284

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Best Practices Guide to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Best Practices Guide on Facebook Tweet about...

285

The Engineered Approach to Energy and Maintenance Effective Steam Trapping  

E-Print Network (OSTI)

The engineered approach to steam trap sizing, selection and application has proven effective in significantly reducing a plant's fuel consumption, maintenance and trap replacement costs while improving thermal efficiency and overall steam system performance. New field test procedures for measuring condensate load and steam loss have proven valuable in sizing traps and to determine which trap is the most energy efficient. The combination of using the engineered approach to steam trapping, field tests to verify trap performance and good maintenance practices has contributed to a major reduction in energy consumption of 10-50% in many industrial plants.

Krueger, R. G.; Wilt, G. W.

1980-01-01T23:59:59.000Z

286

Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.  

DOE Green Energy (OSTI)

This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific data recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of operating wind turbines. This report is intended to help develop a basic understanding of the data needed for reliability analysis from a Computerized Maintenance Management System (CMMS) and other data systems. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and analysis and reporting needs. The 'Motivation' section of this report provides a rationale for collecting and analyzing field data for reliability analysis. The benefits of this type of effort can include increased energy delivered, decreased operating costs, enhanced preventive maintenance schedules, solutions to issues with the largest payback, and identification of early failure indicators.

Peters, Valerie A.; Ogilvie, Alistair B.

2012-01-01T23:59:59.000Z

287

Operations and Maintenance Team | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Team Operations and Maintenance Team October 16, 2013 - 5:00pm Addthis Assembling the right set of skills and resources to operate and maintain a renewable energy system is critical. Renewable energy technologies only perform as specified when managed by a well-trained, highly motivated operations and maintenance (O&M) team. For a renewable energy project financed through an energy savings performance contract (ESPC) or a power purchase agreement (PPA), primary O&M services are typically delivered as part of the agreement, but in-house staff will need some familiarity with the system. For agency-funded projects, O&M services may be provided by in-house facilities staff, a contracted service provider, or a combination of the two. Experienced O&M staff can provide valuable input and should be included in

288

Geothermal power plant R and D: an analysis of cost-performance tradeoffs and the Heber Binary-Cycle Demonstration Project  

SciTech Connect

A study of advancements in power plant designs for use at geothermal resources in the low to moderate (300 to 400F) temperature range is reported. In 3 case studies, the benefits of R and D to achieve these advancements are evaluated in terms of expected increases in installed geothermal generating capacity over the next 2 decades. A parametric sensitivity study is discussed which analyzes differential power development for combinations of power plant efficiency and capitol cost. Affordable tradeoffs between plant performance and capital costs are illustrated. The independent review and analysis of the expected costs of construction, operation and maintenance of the Heber Binary Cycle Geothermal Power Demonstration Plant are described. Included in this assessment is an analysis of each of the major cost components of the project, including (1) construction cost, (2) well field development costs, (3) fluid purchase costs, and (4) well field and power plant operation and maintenance costs. The total cost of power generated from the Heber Plant (in terms of mills per kWh) is then compared to the cost of power from alternative fossil-fueled base load units. Also evaluated are the provisions of both: (a) the Cooperative Agreement between the federal government and San Diego Gas and Electric (SDG and E); and (b) the Geothermal Heat Sales Contract with Union Oil Company.

Cassel, T.A.V.; Amundsen, C.B.; Blair, P.D.

1983-06-30T23:59:59.000Z

289

Preliminary benefit-cost analysis of the Fast Flux Test Facility (FFTF) power addition  

SciTech Connect

The primary objective of this report is to conduct a preliminary benefit-cost study for the proposed power addition to FFTF to determine whether the project is cost-effective. If the project is authorized, construction will begin in 1986 and end in 1991. Full power operation is scheduled to begin in 1991 and a project life of 20 years is assumed. The undiscounted cost during the construction period of the FFTF power addition is estimated to be approximately $117 million over the construction period (1984 dollars). An additional $3 million is estimated as the opportunity cost - or value of these resources in their most favorable alternative use - of surplus FFTF equipment and unused CRBR equipment, including materials for steam generator fabrication. The annual operating and maintenance cost of the project is estimated to be about $2.1 million in 1984 dollars. 20 references.

Callaway, J.M.; Lezberg, A.J.; Scott, M.J.; Tawil, J.J.

1984-07-01T23:59:59.000Z

290

Technological cost-reduction pathways for attenuator wave energy converters in the marine hydrokinetic environment.  

SciTech Connect

This report considers and prioritizes the primary potential technical costreduction pathways for offshore wave activated body attenuators designed for ocean resources. This report focuses on technical research and development costreduction pathways related to the device technology rather than environmental monitoring or permitting opportunities. Three sources of information were used to understand current cost drivers and develop a prioritized list of potential costreduction pathways: a literature review of technical work related to attenuators, a reference device compiled from literature sources, and a webinar with each of three industry device developers. Data from these information sources were aggregated and prioritized with respect to the potential impact on the lifetime levelized cost of energy, the potential for progress, the potential for success, and the confidence in success. Results indicate the five most promising costreduction pathways include advanced controls, an optimized structural design, improved power conversion, planned maintenance scheduling, and an optimized device profile.

Bull, Diana L; Ochs, Margaret Ellen

2013-09-01T23:59:59.000Z

291

High temperature process steam application at the Southern Union Refining Company, Hobbs, New Mexico. Solar energy in the oil patch. Final report, Phase III: operation, maintenance, and performance  

DOE Green Energy (OSTI)

This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly total than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.

Wilson, L.E.; McGuire, D.R.

1984-05-01T23:59:59.000Z

292

Electrochemical system including lamella settler crystallizer  

DOE Patents (OSTI)

A crystallizer which incorporates a lamella settler and which is particularly applicable for use in batteries and power cells for electric vehicles or stationary applications. The lamella settler can be utilized for coarse particle separation or for agglomeration, and is particularly applicable to aluminum-air batteries or power cells for solving the hydrargillite (aluminum-hydroxide) removal problems from such batteries. This invention provides the advantages of very low energy consumption, turbulence, shear, cost and maintenance. Thus, due to the low shear and low turbulence of this invention, it is particularly effective in the control of aluminum hydroxide particle size distribution in the various sections of an aluminum-air system, as will as in other elecrochemical systems requiring separation for phases of different densities.

Maimoni, Arturo (Orinda, CA)

1988-01-01T23:59:59.000Z

293

Commercial equipment cost database  

SciTech Connect

This report, prepared for DOE, Office of Codes and Standards, as part of the Commercial Equipment Standards Program at Pacific Northwest Laboratory, specifically addresses the equipment cost estimates used to evaluate the economic impacts of revised standards. A database including commercial equipment list prices and estimated contractor costs was developed, and through statistical modeling, estimated contractor costs are related to equipment parameters including performance. These models are then used to evaluate cost estimates developed by the ASHRAE 90.1 Standing Standards Project Committee, which is in the process of developing a revised ASHRAE 90.1 standard. The database will also be used to support further evaluation of the manufacturer and consumer impacts of standards. Cost estimates developed from the database will serve as inputs to economic modeling tools, which will be used to estimate these impacts. Preliminary results suggest that list pricing is a suitable measure from which to estimate contractor costs for commercial equipment. Models developed from these cost estimates accurately predict estimated costs. The models also confirm the expected relationships between equipment characteristics and cost. Cost models were developed for gas-fired and electric water heaters, gas-fired packaged boilers, and warm air furnaces for indoor installation. Because of industry concerns about the use of the data, information was not available for the other categories of EPAct-covered equipment. These concerns must be addressed to extend the analysis to all EPAct equipment categories.

Freeman, S.L.

1995-01-01T23:59:59.000Z

294

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

O&M Best Practices Guide, Release 3.0 6.1 O&M Best Practices Guide, Release 3.0 6.1 Chapter 6 Predictive Maintenance Technologies 6.1 Introduction Predictive maintenance attempts to detect the onset of a degradation mechanism with the goal of correcting that degradation prior to significant deterioration in the component or equipment. The diagnostic capabilities of predictive maintenance technologies have increased in recent years with advances made in sensor technologies. These advances, breakthroughs in component sensitivities, size reductions, and most importantly, cost, have opened up an entirely new area of diagnostics to the O&M practitioner. As with the introduction of any new technology, proper application and TRAINING is of

295

NMAC Post Maintenance Testing Guide, Revision 1  

Science Conference Proceedings (OSTI)

This Nuclear Maintenance Applications Center (NMAC) guide addresses the concern of member utilities regarding the adequacy and consistency of post-maintenance testing programs. The guide provides information on structuring, developing, organizing, and controlling a post-maintenance testing program in a power plant. It stresses the importance of advance planning to post-maintenance testing.

2004-12-08T23:59:59.000Z

296

Generator Bushing Installation and Maintenance Guide  

Science Conference Proceedings (OSTI)

This report is a comprehensive guide to generator high-voltage bushing (HVB) installation and maintenance.

2008-12-04T23:59:59.000Z

297

Machine Maintenance Integrated Performance Support System  

SciTech Connect

The objectives of this partnership project were to develop a preventive maintenance checklist program, a troubleshooting system for the Vertical Turning Center (VTC)-5, an on-line manual, and to integrate these components with a custom browser that would run on the VTC-5 machine's controller and would support future internet/intranet delivery. Kingsbury provided subject matter experts from engineering, manufacturing, and technical support. They also provided photographs, schematics, and CAD drawings, which AlliedSignal Federal Manufacturing and Technologies (ASFM and T) digitized for use in the final program. Information from The Kingsbury troubleshooting experts were interviewed regarding symptoms and root causes of system malfunctions This knowledge was captured and from it, fault trees were developed. These trees were then incorporated into the EPSS as a troubleshooting tool. The troubleshooting portion of the system presents simple questions to the machine operator in order to determine the likely cause or causes of malfunctions and then recommends systematic corrective actions. The on-line reference manual, covering operations and maintenance, provides text and illustrations to the machine operator in a traditional structure, but additionally offers the capability to search voluminous amounts of technical data and retrieve specific information on request. The maintenance portion of the EPSS includes checklists that are displayed daily, weekly, monthly, and annually, as appropriate, on the VTC-5 controller screen. The controller software is unavailable for machining parts until the machine tool operator goes through and checks off all of the checklist items. This project provided the team with a detailed understanding of the knowledge and information required to produce and support advanced machine tools. In addition, it resulted in the design and construction of a prototype VTC-5 EPSS containing all the logic and interfaces necessary to integrate operations and maintenance information from other Kingsbury machine tools.

Bohley, M.C.; Schwartz, M.E.

1998-03-11T23:59:59.000Z

298

An analysis of the costs of running a station car fleet  

SciTech Connect

Station cars are electric vehicles available at transit stations which may be used for transportation between the transit station and home, work, and/or for errands. This transportation service would be provided by the local transit agency. This report discusses an economic model of the costs of running a station car fleet. While some of these costs are highly uncertain, this analysis is a first look at the required user fees for full cost recovery. The model considers the capital costs of the vehicles and the required infrastructure; the annual fixed vehicle costs for insurance, registration, etc.; the mileage-based costs; and the annual non-vehicle costs for administration, infrastructure maintenance, etc. The model also includes various factors such as the fleet size, the annual mileage, the number of transit stations that would have facilities for station cars, and the number of users. The model specifically examines the cost of using of electric vehicles; however, for comparison, the cost of using a fleet of gasoline-powered vehicles also is calculated. This report examines the sensitivity of the model to the various factors. A principal conclusion from the analysis is that the largest cost contributor is the initial vehicle purchase price. For a given initial purchase price, the factor driving the user fee required for full cost recovery is the number of different daily users of a vehicle. The model also compares the annual cost of transportation using station cars and mass transit to the annual cost of solo commuting. If a station car is used by more than one person a day, and this use replaces the ownership of a conventional vehicle, the annual cost of transportation may be similar. However, for the base case assumptions, the station car user fee required for full cost recovery is higher than the cost of solo commuting.

Zurn, R.M.

1995-02-01T23:59:59.000Z

299

CRAD, Maintenance Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Assessment Plan Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of parts, materials, and services needed to support the

300

How much does it cost to generate electricity with different types ...  

U.S. Energy Information Administration (EIA)

How much does it cost to generate electricity with different types of power plants? EIA has historical data on the average annual operation, maintenance, ...

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Circuit Breaker Maintenance; Volume 1: Low-Voltage Circuit Breakers; Part 2: GE AK Models: Volume 1: Low-Voltage Circuit Breakers Pa rt 2: GE AK Models  

Science Conference Proceedings (OSTI)

This comprehensive guide will help utilities improve their maintenance of GE model AK circuit breakers. It consolidates industry guidelines, applicable standards, original equipment manufacturer recommendations, and hands-on experience relative to these circuit breakers. Ultimately, improved maintenance will increase reliability and reduce costs associated with corrective maintenance and equipment downtime.

1992-05-02T23:59:59.000Z

302

Sensitivity Analysis of Offshore Wind Cost of Energy (Poster)  

DOE Green Energy (OSTI)

No matter the source, offshore wind energy plant cost estimates are significantly higher than for land-based projects. For instance, a National Renewable Energy Laboratory (NREL) review on the 2010 cost of wind energy found baseline cost estimates for onshore wind energy systems to be 71 dollars per megawatt-hour ($/MWh), versus 225 $/MWh for offshore systems. There are many ways that innovation can be used to reduce the high costs of offshore wind energy. However, the use of such innovation impacts the cost of energy because of the highly coupled nature of the system. For example, the deployment of multimegawatt turbines can reduce the number of turbines, thereby reducing the operation and maintenance (O&M) costs associated with vessel acquisition and use. On the other hand, larger turbines may require more specialized vessels and infrastructure to perform the same operations, which could result in higher costs. To better understand the full impact of a design decision on offshore wind energy system performance and cost, a system analysis approach is needed. In 2011-2012, NREL began development of a wind energy systems engineering software tool to support offshore wind energy system analysis. The tool combines engineering and cost models to represent an entire offshore wind energy plant and to perform system cost sensitivity analysis and optimization. Initial results were collected by applying the tool to conduct a sensitivity analysis on a baseline offshore wind energy system using 5-MW and 6-MW NREL reference turbines. Results included information on rotor diameter, hub height, power rating, and maximum allowable tip speeds.

Dykes, K.; Ning, A.; Graf, P.; Scott, G.; Damiami, R.; Hand, M.; Meadows, R.; Musial, W.; Moriarty, P.; Veers, P.

2012-10-01T23:59:59.000Z

303

Cost of Fuel to General Electricity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Fuel to Generate Electricity of Fuel to Generate Electricity Cost of Fuel to Generate Electricity Herb Emmrich Gas Demand Forecast, Economic Analysis & Tariffs Manager SCG/SDG&E SCG/SDG&E Federal Utility Partnership Working Group (FUPWG) 2009 Fall Meeting November 18, 2009 Ontario, California The Six Main Costs to Price Electricity are:  Capital costs - the cost of capital investment (debt & equity), depreciation, Federal & State income taxes and property taxes and property taxes  Fuel costs based on fuel used to generate electricity - hydro, natural gas, coal, fuel oil, wind, solar, photovoltaic geothermal biogas photovoltaic, geothermal, biogas  Operating and maintenance costs  Transmission costs  Distribution costs  Social adder costs - GHG adder, low income adder,

304

Y-12 Plant Decontamination and Decommissioning Program. Surveillance and Maintenance Plan, FY 1992--2000  

Science Conference Proceedings (OSTI)

The Decontamination and Decommissioning (D and D) Program at the Oak Ridge Y-12 Plant is part of the Environmental Restoration (ER) and Waste Management (WM) Programs (ERWM). The objective of the ER Program is to provide Y-12 the capability to meet applicable environmental regulations through facility development activities and site remedial actions. The WM Program supports the ER program. The D and D Program provides collective management of sites within the Plant which are in need of decontamination and decommissioning efforts, prioritizes those areas in terms of health, safety, and environmental concerns, and implements the appropriate level of remedial action. The D and D Program provides support to identifiable facilities which formerly served one or more of the many Plant functions. Program activities include (1) surveillance and maintenance of facilities awaiting decommissioning; (2) planning safe and orderly facility decommissioning; and (3) implementing a program to accomplish facility disposition in a safe, cost effective, and timely manner. In order to achieve the first objective, a formal plan which documents the surveillance and maintenance needs for each facility has been prepared. This report provides this documentation for the Y-12 facilities currently included in the D and D Program, as well as those planned for future inclusion in the Program, and includes projected resource requirements for the planning period of FY 1993 through FY 2000.

Not Available

1992-01-01T23:59:59.000Z

305

Surveillance and Maintenance Plan for the ORNL Decontamination and Decommissioning Program FY 1993--2002  

Science Conference Proceedings (OSTI)

The Decontamination and Decommissioning (D&D) Program at the Oak Ridge National Laboratory (ORNL) is part of the Department of Energy (DOE) Environmental Restoration D&D program. The purpose and objectivesof this program include: (1) surveillance and maintenance (S&M) of facilities awaiting decommissioning; (2) planning for the orderly decommissioning of these facilities; and (3) implementation of a program to accomplish facility disposition in a safe, cost-effective, and timely manner. Participating D&D contractors are required to prepare formal plans that document the S&M programs established for each site. This report has been prepared to provide this documentation for those facilities included in the ORNL D&D Program.

Ford, M.K.; Holder, L. Jr.

1992-07-01T23:59:59.000Z

306

Nuclear Maintenance Applications Center: Air-Operated Valve Maintenance Guide: Revision 2  

Science Conference Proceedings (OSTI)

An increased awareness of the importance of air-operated valves (AOVs) has led to progressively more sophisticated maintenance practices within the nuclear industry. Nonnuclear plants are also heavily dependent on reliable AOV operation. The dynamic method used by fossil power plants to satisfy transient electrical demands places additional stress on plant components, including AOVs. Therefore, there is a growing need for standardized technical guidance related to AOVs. The Electric Power Research Instit...

2008-12-18T23:59:59.000Z

307

Electricity Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Emissions Caps and the Impact of a Radical Change in Nuclear Electricity Costs journal International Journal of Energy Economics and Policy volume year month chapter...

308

Life-cycle cost comparisons of advanced storage batteries and fuel cells for utility, stand-alone, and electric vehicle applications  

DOE Green Energy (OSTI)

This report presents a comparison of battery and fuel cell economics for ten different technologies. To develop an equitable economic comparison, the technologies were evaluated on a life-cycle cost (LCC) basis. The LCC comparison involved normalizing source estimates to a standard set of assumptions and preparing a lifetime cost scenario for each technology, including the initial capital cost, replacement costs, operating and maintenance (O M) costs, auxiliary energy costs, costs due to system inefficiencies, the cost of energy stored, and salvage costs or credits. By considering all the costs associated with each technology over its respective lifetime, the technology that is most economical to operate over any given period of time can be determined. An analysis of this type indicates whether paying a high initial capital cost for a technology with low O M costs is more or less economical on a lifetime basis than purchasing a technology with a low initial capital cost and high O M costs. It is important to realize that while minimizing cost is important, the customer will not always purchase the least expensive technology. The customer may identify benefits associated with a more expensive option that make it the more attractive over all (e.g., reduced construction lead times, modularity, environmental benefits, spinning reserve, etc.). The LCC estimates presented in this report represent three end-use applications: utility load-leveling, stand-alone power systems, and electric vehicles.

Humphreys, K.K.; Brown, D.R.

1990-01-01T23:59:59.000Z

309

Low cost MCFC anodes  

DOE Green Energy (OSTI)

This paper outlines a project, funded under a DOE SBIR grant, which tested a potentially lower cost method of manufacturing MCFC stack anodes and evaluated the feasibility of using the technology in the existing M-C Power Corp. manufacturing facility. The procedure involves adding activator salts to the anode tape casting slurry with the Ni and Cr or Al powders. Two different processes occur during heat treatment in a reducing environment: sintering of the base Ni structure, and alloying or cementation of the Cr or Al powders. To determine whether it was cost-effective to implement the cementation alloying manufacturing process, the M-C Power manufacturing cost model was used to determine the impact of different material costs and processing parameters on total anode cost. Cost analysis included equipment expenditures and facility modifications required by the cementation alloying process.

Erickson, D.S.

1996-12-31T23:59:59.000Z

310

Plant maintenance and outage management issue, 2005  

SciTech Connect

The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

Agnihotri, Newal (ed.)

2005-01-15T23:59:59.000Z

311

Plant maintenance and advanced reactors issue, 2004  

SciTech Connect

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Optimism about the future of nuclear power, by Ruth G. Shaw, Duke Power Company; Licensed in three countries, by GE Energy; Enhancing public acceptance, by Westinghouse Electric Company; Standardized MOV program, by Ted Neckowicz, Exelon; Inservice testing, by Steven Unikewicz, U.S. Nuclear Regulatory Commission; Asian network for education, Fatimah Mohd Amin, Malaysian Institute for Nuclear Technology Research; and, Cooling water intake optimization, by Jeffrey M. Jones and Bert Mayer, P.E., Framatome ANP.

Agnihotri, Newal (ed.)

2004-09-15T23:59:59.000Z

312

U.S. Nuclear Power Plant Operating Cost and Experience Summaries  

Science Conference Proceedings (OSTI)

The ''U.S. Nuclear Power Plant Operating Cost and Experience Summaries'' (NUREG/CR-6577, Supp. 2) report has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants during 2000-2001. Costs incurred after initial construction are characterized as annual production costs, which represent fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications, which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operations summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from operating reports submitted by the licensees, the Nuclear Regulatory Commission (NRC) database for enforcement actions, and outage reports.

Reid, RL

2003-09-18T23:59:59.000Z

313

Nuclear Maintenance Applications Center: Foreign Material Exclusion Guidelines  

Science Conference Proceedings (OSTI)

Foreign material exclusion (FME) is vital to the safe and reliable operation of nuclear power plants. The entry of foreign material (FM) into primary or secondary plant systems, equipment, and components can cause equipment degradation or inoperability, lost generation, fuel cladding damage, high radiation, and contamination levels that could spread throughout plant systems; it can also increase operations and maintenance (O&M) costs and adversely impact nuclear safety. The FME program is a plantwide ini...

2008-07-01T23:59:59.000Z

314

Software Cost Estimation  

E-Print Network (OSTI)

Software cost estimation is the process of predicting the effort required to develop a software system. Many estimation models have been proposed over the last 30 years. This paper provides a general overview of software cost estimation methods including the recent advances in the field. As a number of these models rely on a software size estimate as input, we first provide an overview of common size metrics. We then highlight the cost estimation models that have been proposed and used successfully. Models may be classified into 2 major categories: algorithmic and non-algorithmic. Each has its own strengths and weaknesses. A key factor in selecting a cost estimation model is the accuracy of its estimates. Unfortunately, despite the large body of experience with estimation models, the accuracy of these models is not satisfactory. The paper includes comment on the performance of the estimation models and description of several newer approaches to cost estimation.

Hareton Leung Zhang; Zhang Fan

2002-01-01T23:59:59.000Z

315

Reasons for choosing CP2 pavement design: Requires less frequent maintenance, repair and rehabilitation.  

E-Print Network (OSTI)

tubes (ASTM A276) minimum Yield Strength of 60 ksi. Life Expectancy · 50+ Years Cost per square foot Approximately $10.56 per Square Foot (Plain Cement Concrete Pavement, RPS, 15" Depth) 72,207 SQ YD @ $95.00/SQ Roadway Delay cost produced by congestion of Maintenance and Protection of Traffic due to frequent

316

Substation battery-maintenance procedures  

SciTech Connect

The frequency of substation battery failures is gratifyingly low. One trouble spot appears to be extraneous short circuits that drain an otherwise healthy battery. Use of the lead--calcium battery promises to reduce substantially the amount of maintenance that substation batteries need.

Timmerman, M.H.

1976-05-15T23:59:59.000Z

317

Decontamination and decommissioning surveillance and maintenance report for FY 1991  

SciTech Connect

The Decontamination and Decommissioning (D D) Program has three distinct phases: (1) surveillance and maintenance (S M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D D is devoted to S M at each of the sites. Our S M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

Not Available

1991-12-01T23:59:59.000Z

318

Optimization of Transmission Line Design Using Life Cycle Costing  

Science Conference Proceedings (OSTI)

When an overhead line is designed, all costs incurred during the expected life of the line should be considered. The total cost during the life or life-cycle cost of a transmission line is a combination of the initial capital cost, operation and maintenance (O&M) cost, cost of electrical losses over its entire life, and dependability associated costs. The option that has the lowest life-cycle cost is selected as the optimized design. A tool is required by utility engineers to help them readily select an ...

2009-12-22T23:59:59.000Z

319

Optimization of Transmission Line Design Using Life-Cycle Costing  

Science Conference Proceedings (OSTI)

When an overhead line is designed, all costs incurred during the expected life of the line should be considered. The total cost during the life, or life-cycle cost, of a transmission line is a combination of the initial capital cost, operation and maintenance (O&M) cost, cost of electrical losses over its entire life, and dependability-associated costs. The option that has the lowest life-cycle cost is selected as the optimized design. A tool is required by utility engineers to help them readily select a...

2008-12-09T23:59:59.000Z

320

OMB Circular A-21: Direct Charging Practices Major Types of Costs  

E-Print Network (OSTI)

are those costs that can be identified specifically with a particular sponsored project or that can costs · Human subject payments · Repair & maintenance costs for equipment used for the project · Travel and specifically with a particular sponsored project. (These costs were previously known as indirect costs.). Do

Yamamoto, Keith

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Nuclear Maintenance Applications Center: Main Feedwater Pump Maintenance Guide  

Science Conference Proceedings (OSTI)

Loss of a main feedwater pump can have severe economic impact on a nuclear utility. The majority of forced outages or power reductions are believed to be attributed to nondesign issues. Case leaks, excessive vibration, seal leaks, and lubrication system problems are shown to significantly impact feedwater pump availability. Improved maintenance practices and increased attention to these issues are critical for realizing longevity of main feedwater ...

2012-11-14T23:59:59.000Z

322

Nuclear Maintenance Applications Center: Maintenance Work Package Planning Guidance  

Science Conference Proceedings (OSTI)

The work management process is one of the core business processes outlined within the Nuclear Energy Institute (NEI) Standard Nuclear Performance Model for operation and maintenance of nuclear power plants. The preparation of work packages is a key element of this overall process. The purpose of this report is to provide guidance to power plant personnel regarding work package quality as a supplement to Institute of Nuclear Power Operations (INPO) AP-928, Work Management Process Description. The ...

2013-09-10T23:59:59.000Z

323

Comparison of costs for alternative mixed low-level waste treatment systems  

SciTech Connect

Total life cycle costs (TLCCs), including disposal costs, of thermal, nonthermal and enhanced nonthermal systems were evaluated to guide future research and development programs for the treatment of mixed low-level waste (MLLW) consisting of RCRA hazardous and low-level radioactive wastes. In these studies, nonthermal systems are defined as those systems that process waste at temperatures less than 350 C. Preconceptual designs and costs were developed for thirty systems with a capacity (2,927 lbs/hr) to treat the DOE MLLW stored inventor y(approximately 236 million pounds) in 20 years in a single, centralized facility. A limited comparison of the studies` results is presented in this paper. Sensitivity of treatment costs with respect to treatment capacity, number of treatment facilities, and system availability were also determined. The major cost element is operations and maintenance (O and M), which is 50 to 60% of the TLCC for both thermal and nonthermal systems. Energy costs constitute a small fraction (< 1%) of the TLCCs. Equipment cost is only 3 to 5% of the treatment cost. Evaluation of subsystem costs demonstrate that receiving and preparation is the highest cost subsystem at about 25 to 30% of the TLCC for both thermal and nonthermal systems. These studies found no cost incentives to use nonthermal or hybrid (combined nonthermal treatment with stabilization by vitrification) systems in place of thermal systems. However, there may be other incentives including fewer air emissions and less local objection to a treatment facility. Building multiple treatment facilities to treat the same total mass of waste as a single facility would increase the total treatment cost significantly, and improved system availability decreases unit treatment costs by 17% to 30%.

Schwinkendorf, W.E.; Harvego, L. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Cooley, C.R. [Dept. of Energy (United States); Biagi, C. [Morrison Knudsen (United States)

1996-12-31T23:59:59.000Z

324

Solar Water Heating with Low-Cost Plastic Systems (Brochure)  

DOE Green Energy (OSTI)

Newly developed solar water heating technology can help Federal agencies cost effectively meet the EISA requirements for solar water heating in new construction and major renovations. This document provides design considerations, application, economics, and maintenance information and resources.

Not Available

2012-01-01T23:59:59.000Z

325

Malaysian food service organisations and transaction cost.  

E-Print Network (OSTI)

??Portfolio includes: paper 1. Malaysian food service organisations and transaction cost: literature review  – paper 2. Malaysian food service organisations and transaction cost: comparative analysis… (more)

Lok, Stanley Yap Peng.

2007-01-01T23:59:59.000Z

326

An examination of the costs and critical characteristics of electric utility distribution system capacity enhancement projects  

Science Conference Proceedings (OSTI)

This report classifies and analyzes the capital and total costs (e.g., income tax, property tax, depreciation, centralized power generation, insurance premiums, and capital financing) associated with 130 electricity distribution system capacity enhancement projects undertaken during 1995-2002 or planned in the 2003-2011 time period by three electric power utilities operating in the Pacific Northwest. The Pacific Northwest National Laboratory (PNNL), in cooperation with participating utilities, has developed a large database of over 3,000 distribution system projects. The database includes brief project descriptions, capital cost estimates, the stated need for each project, and engineering data. The database was augmented by additional technical (e.g., line loss, existing substation capacities, and forecast peak demand for power in the area served by each project), cost (e.g., operations, maintenance, and centralized power generation costs), and financial (e.g., cost of capital, insurance premiums, depreciations, and tax rates) data. Though there are roughly 3,000 projects in the database, the vast majority were not included in this analysis because they either did not clearly enhance capacity or more information was needed, and not available, to adequately conduct the cost analyses. For the 130 projects identified for this analysis, capital cost frequency distributions were constructed, and expressed in terms of dollars per kVA of additional capacity. The capital cost frequency distributions identify how the projects contained within the database are distributed across a broad cost spectrum. Furthermore, the PNNL Energy Cost Analysis Model (ECAM) was used to determine the full costs (e.g., capital, operations and maintenance, property tax, income tax, depreciation, centralized power generation costs, insurance premiums and capital financing) associated with delivering electricity to customers, once again expressed in terms of costs per kVA of additional capacity. The projects were sorted into eight categories (capacitors, load transfer, new feeder, new line, new substation, new transformer, reconductoring, and substation capacity increase) and descriptive statistics (e.g., mean, total cost, number of observations, and standard deviation) were constructed for each project type. Furthermore, statistical analysis has been performed using ordinary least squares regression analysis to identify how various project variables (e.g., project location, the primary customer served by the project, the type of project, the reason for the upgrade, size of the upgrade) impact the unit cost of the project.

Balducci, Patrick J.; Schienbein, Lawrence A.; Nguyen, Tony B.; Brown, Daryl R.; Fathelrahman, Eihab M.

2004-06-01T23:59:59.000Z

327

Assessment of light water reactor power plant cost and ultra-acceleration depreciation financing  

E-Print Network (OSTI)

Although in many regions of the U.S. the least expensive electricity is generated from light-water reactor (LWR) plants, the fixed (capital plus operation and maintenance) cost has increased to the level where the cost ...

El-Magboub, Sadek Abdulhafid.

328

Wind Turbine Lubrication Maintenance Guide  

Science Conference Proceedings (OSTI)

With the rush to develop todays massive wind energy sites, more attention should be paid to the inevitable need to perform routine maintenance and develop practical means of assessing the condition of the components within the nacelles and other outside support equipment for the wind farms. Current operating models have not adequately established accurate assumptions or expectations on the unavailability of the windmills and the impact on lost generation. Contracts for purchase of their generation output...

2012-06-20T23:59:59.000Z

329

Electric Motor Predictive Maintenance: Draft Guidelines  

Science Conference Proceedings (OSTI)

Predictive Maintenance can enhance the early detection and avoidance of incipient equipment failures in electric motors. This report provides draft guidelines to support the development of electric motor predictive maintenance (EMPM) programs at utility sites.

1997-10-16T23:59:59.000Z

330

African Easterly Jet: Structure and Maintenance  

Science Conference Proceedings (OSTI)

This article investigates the African easterly jet (AEJ), its structure, and the forcings contributing to its maintenance, critically revisiting previous work that attributed the maintenance of the jet to soil moisture gradients over tropical ...

Man-Li C. Wu; Oreste Reale; Siegfried D. Schubert; Max J. Suarez; Randy D. Koster; Philip J. Pegion

2009-09-01T23:59:59.000Z

331

A quality assurance program for software maintenance  

Science Conference Proceedings (OSTI)

This paper presents the description of a quality assurance (QA) program applied to software maintenance projects. The QA program is a set of checks or inspections overlaid on the steps of the maintenance project. The relationship between the QA program ...

John W. Center

1982-06-01T23:59:59.000Z

332

Improving maintenance operation through transformational outsourcing  

E-Print Network (OSTI)

Outsourcing maintenance to third-party contractors has become an increasingly popular option for manufacturers to achieve tactical and/or strategic objectives. Though simple in concept, maintenance outsourcing is difficult ...

Ye, Jacqueline Ming-Shih

2007-01-01T23:59:59.000Z

333

EPRI Maintenance Excellence Matrix Revision Status  

Science Conference Proceedings (OSTI)

This report documents the progress in revising the Electric Power Research Institute EPRI 2002 Report 1004705, Maintenance Excellence Matrix Assessment Guideline for Fossil Power Plants, which provides utilities a comprehensive self-assessment guideline for improving maintenance processes.

2008-12-23T23:59:59.000Z

334

Africa's Transport Infrastructure Mainstreaming Maintenance and...  

Open Energy Info (EERE)

icon Twitter icon Africa's Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary Name: Africa's Transport Infrastructure...

335

Types of Costs Types of Cost Estimates  

E-Print Network (OSTI)

· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining the equipment for reclamation? Types of Costs #12;· Marginal Cost: ­ Change in total cost ­ Any production process involves fixed and variable costs. As production increases/expands, fixed costs are unchanged, so

Boisvert, Jeff

336

Knowledge-Projection for Tele-Maintenance  

E-Print Network (OSTI)

-to-end system fault diagnosis and repair ­ Opening up opportunities to streamline the maintenance process Demo Data Mining GUI Query & Browse Facility System Trainer · Maintenance Procedures · Session Capture Navigator Query Engine Query Processing & Knowledge Retrieval Process Engine Dynamic Maintenance Management

Tu, Yicheng

337

Electrohydraulic Control (EHC) Fluid Maintenance Guide  

Science Conference Proceedings (OSTI)

The "Electrohydraulic Control (EHC) Fluid Maintenance Guide" provides plant personnel with information on the operation, maintenance, and performance of the electrohydraulic control (EHC) system. The contents of this guide will aid plant workers in improving EHC system reliability, performance, and plant maintenance practices.

2002-12-29T23:59:59.000Z

338

PRE-SW Strategic Capacity Axial Compressor Maintenance Program (SCAMP) Version 3.0, Beta  

Science Conference Proceedings (OSTI)

The Strategic Capacity Axial-Compressor Maintenance Program (SCAMP) spreadsheet provides combustion turbine operators with a low-cost, easy-to-install, easy-to-use program for monitoring combustion turbine axial compressor and overall turbine performance.  It can be used to diagnose the condition of axial compressors and to determine the benefits of maintenance actions such as an off-line compressor wash.Benefits & ...

2012-09-23T23:59:59.000Z

339

COST SHARING ON SPONSORED PROJECTS  

E-Print Network (OSTI)

COST SHARING ON SPONSORED PROJECTS 1 California Institute of Technology Issuing Authority: Office is that portion of the total cost of an externally funded project that is not funded by the sponsor. Depending as a demonstration of its commitment to the project. When voluntary cost sharing is included in the proposal budget

Tai, Yu-Chong

340

Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.  

DOE Green Energy (OSTI)

This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

2005-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Cask system maintenance in the Federal Waste Management System  

SciTech Connect

In early 1988, in support of the development of the transportation system for the Office of Civilian Radioactive Waste Management System (OCRWM), a feasibility study was undertaken to define a the concept for a stand-alone, green-field'' facility for maintaining the Federal Waste Management System (FWMS) casks. This study provided and initial layout facility design, an estimate of the construction costs, and an acquisition schedule for a Cask Maintenance Facility (CMF). It also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs derived from the study have been organized for use in the total transportation system decision-making process. Most importantly, they also provide a foundation for continuing design and planning efforts. The feasibility study was based on an assumed stand-alone, green-field'' configuration. This design approach provides a comprehensive design evaluation, to guide the development of a cost estimate and to permit flexibility in locating the facility. The following sections provide background information on cask system maintenance, briefly summarizes some of the functional requirements that a CMF must satisfy, provides a physical description of the CMF, briefly discusses the cost and schedule estimates and then reviews the findings of the efforts undertaken since the feasibility study was completed. 15 refs., 3 figs.

Pope, R.B.; Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1991-01-01T23:59:59.000Z

342

Robust Maintenance Policies for Markovian Systems under Model Uncertainty  

E-Print Network (OSTI)

of various pavement management maintenance actions, (MadanatOptimal maintenance decisions for pavement management,Optimal Maintenance and Repair Policies in Asset Management

Kuhn, Kenneth D.; Madanat, Samer M.

2005-01-01T23:59:59.000Z

343

Robust maintenance policies for Markovian systems under model uncertainty  

E-Print Network (OSTI)

of various pavement management maintenance actions, (MadanatOptimal maintenance decisions for pavement management,Optimal Maintenance and Repair Policies in Asset Management

Kuhn, K D; Madanat, S M

2006-01-01T23:59:59.000Z

344

WSDOT highway maintenance: environmental compliance for protected terrestrial species  

E-Print Network (OSTI)

in figure 3. Maintenance Activity Best Management PracticesOlympic Region Maintenance Program on management recommen-If a maintenance activity is not exempt, Best Management

O’Brien, Tracie; Carey, Marion; Forrester, Bret

2005-01-01T23:59:59.000Z

345

Human Factors/Ergonomics Handbook for the Design for Ease of Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 2.0 DESIGN FOR MAINTAINABILITY This section contains human factors guidance for designing systems, subsystems, equipment and facilities so that maintenance is easy and cost effective. 2.1 Unitization, modularization, and standardization Unitization refers to separating equipment into physically and functionally distinct units to allow for easy removal and replacement. This type of equipment separation will permit division of maintenance responsibility, especially troubleshooting, among various maintenance levels. Modularization refers to unitized equipment in which the functional units making up a module are integrated and are removed or inserted as a unit. 2.1.1 Goals of unitization/modularization. Unit design/modularization of equipment should

346

COSTS OF NUCLEAR POWER  

SciTech Connect

The discussion on the costs of nuclear power from stationary plants, designed primarily for the generation of electricity. deals with those plants in operation, being built, or being designed for construction at an early date. An attempt is made to consider the power costs on the basis of consistent definitions and assumptions for the various nuclear plants and for comparable fossil-fuel plants. Information on several new power reactor projects is included. (auth)

1961-01-01T23:59:59.000Z

347

TRUPACT-II procedures and maintenance instructions  

Science Conference Proceedings (OSTI)

The purpose of this document is to provide the technical requirements for operation, inspection and maintenance of a TRUPACT-II Shipping Package and directly related components. This document shall supply the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP (NRC Certificate of Compliance No. 9218), the TRUPACT-II SARP shall govern. This document details the operations, maintenance, repair, replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container. These procedures may be modified for site use, but as a minimum all parameters and format listed herein must be included in any site modified version. For convenience and where applicable steps may be performed out of sequence. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the minimum required procedures for use of the adjustable center of gravity lift fixture and the TRUPACT-II transport trailer in conjunction with the TRUPACT-II Packaging.

NONE

1994-01-14T23:59:59.000Z

348

Technological cost%3CU%2B2010%3Ereduction pathways for axial%3CU%2B2010%3Eflow turbines in the marine hydrokinetic environment.  

SciTech Connect

This report considers and prioritizes potential technical costreduction pathways for axialflow turbines designed for tidal, river, and ocean current resources. This report focuses on technical research and development costreduction pathways related to the device technology rather than environmental monitoring or permitting opportunities. Three sources of information were utilized to understand current cost drivers and develop a list of potential costreduction pathways: a literature review of technical work related to axialflow turbines, the U.S. Department of Energy Reference Model effort, and informal webinars and other targeted interactions with industry developers. Data from these various information sources were aggregated and prioritized with respect to potential impact on the lifetime levelized cost of energy. The four most promising costreduction pathways include structural design optimization; improved deployment, maintenance, and recovery; system simplicity and reliability; and array optimization.

Laird, Daniel L.; Johnson, Erick L.; Ochs, Margaret Ellen; Boren, Blake [Oregon State University, Corvallis, OR

2013-05-01T23:59:59.000Z

349

Introduction to production cost models 1.0 Introduction  

E-Print Network (OSTI)

(t) is total maintenance costs in year t. · O(t) is the cost associated with outages. and the overbar in (1 · I(t) is total investment costs at year t · S(t) is total salvage value of retired plants at year t (and for all plants still in operation at year T). · F(t) is total fuel costs in year t. · M

McCalley, James D.

350

ONTOCOM: A Cost Estimation Model for Ontology Engineering  

E-Print Network (OSTI)

Abstract: This paper introduces ONTOCOM, a parametric cost estimation model for Semantic Web ontologies. After analyzing established, general-purpose cost estimation methodologies we propose a methodology, which can be applied to develop cost models for ontology engineering. We examine the particularities of this engineering field on the basis of the proposed methodology, in order to identify cost factors which influence the effort invested in ontology building, reuse and maintenance. 1

Elena Paslaru Bontas; Malgorzata Mochol; Freie Universität

2006-01-01T23:59:59.000Z

351

TRUPACT-II Operating and Maintenance Instructions  

SciTech Connect

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

Westinghouse Electric Corporation, Waste Isolation Division

1999-12-31T23:59:59.000Z

352

HEV Fleet Testing Maintenance Sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

Description Cost 272002 8,668 Oil change 50.17 522002 12,898 Driver ran over debris on road causing foreign object damage to front coolers. Coolers replaced. (not...

353

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

354

Impact of common completion and workover activities on the effective costs of geothermal wells  

DOE Green Energy (OSTI)

The impacts of completion practices on production and maintenance costs are considered. To evaluate alternative completion and workover technologies, a simple model has been developed that compares total well cost to total production or injection. The model is discussed briefly and results from its application to different completion and workover strategies are emphasized. The model development project had three aspects: (1) the establishment of a data base for the cost and effectiveness of various geothermal completion and workover activities; (2) the development of a computer model to specific cases. The data collected include geothermal production characteristics; initial costs and completion practices for representatives wells; estimated costs and effectiveness of common workover equipment and operations; the frequencies of and times required to perform workovers; etc. The model facilitates comparisons of completion and workover alternatives. The results discussed include an analysis of the impact of variations in well lifetime. A comparison of mechanical descaling of geothermal wells to chemical scale inhibition indicates that for certain conditions chemical inhibition is more cost effective. Results of an analysis of injectivity decline are also presented, as are studies of original well cost, initial flow, and productivity decline for production wells. Other results involving underreaming, changing casing profiles, perforating, and hydraulic fracturing are also discussed.

Carson, C.C.; Mansure, A.J.

1982-01-01T23:59:59.000Z

355

Examining the effectiveness of municipal solid waste management systems: An integrated cost-benefit analysis perspective with a financial cost modeling in Taiwan  

Science Conference Proceedings (OSTI)

In order to develop a sound material-cycle society, cost-effective municipal solid waste (MSW) management systems are required for the municipalities in the context of the integrated accounting system for MSW management. Firstly, this paper attempts to establish an integrated cost-benefit analysis (CBA) framework for evaluating the effectiveness of MSW management systems. In this paper, detailed cost/benefit items due to waste problems are particularly clarified. The stakeholders of MSW management systems, including the decision-makers of the municipalities and the citizens, are expected to reconsider the waste problems in depth and thus take wise actions with the aid of the proposed CBA framework. Secondly, focusing on the financial cost, this study develops a generalized methodology to evaluate the financial cost-effectiveness of MSW management systems, simultaneously considering the treatment technological levels and policy effects. The impacts of the influencing factors on the annual total and average financial MSW operation and maintenance (O and M) costs are analyzed in the Taiwanese case study with a demonstrative short-term future projection of the financial costs under scenario analysis. The established methodology would contribute to the evaluation of the current policy measures and to the modification of the policy design for the municipalities.

Weng, Yu-Chi, E-mail: clyde.weng@gmail.com [Solid Waste Management Research Center, Okayama University, Okayama (Japan); Fujiwara, Takeshi [Solid Waste Management Research Center, Okayama University, Okayama (Japan)

2011-06-15T23:59:59.000Z

356

Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

33.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE 33.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES "The familiar level of this module is designed to summarize the basic information in DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities. This Order canceled DOE O 433.1A. This module is divided into three sections. Section one contains the objective, general requirements, and the responsibilities assigned to field element managers. Section two includes the requirements in attachment 2 of the Order, Maintenance Management Program Requirements for DOE Nuclear Facilities. Section three is a summary of the guidance provided in DOE G 433.1-1, Facility Maintenance Management Program Guide for Use with DOE O 433.1.The

357

Reliability centered maintenance of power transformers and circuit breakers  

SciTech Connect

At the Bonneville Power Administration (BPA), we have historically maintained high voltage equipment. Including transformers and power circuit breakers, on a time driven basis. While this has served our needs in the past, newer methods are needed to effectively maintain the power system in future years. Today aging equipment, maintenance backlogs, and budget constraints are a reality. BPA has initiated a research and development project to examine reliability centered maintenance (RCM) as an alternative to time based maintenance on high voltage equipment. Under RCM, the performance of each place of equipment is to be monitored by observing many operating parameters. For example, with circuit breakers we will observe (measure) the trip time, accumulated contact wear using I{sup 2}T, timing of the mechanism, plus several other parameters. Equipment performing below a predetermined level, or equipment having accumulated a large amount of ``usage`` will receive maintenance. The maintenance will restore full performance and preserve an acceptable service life for that piece of equipment. To develop and evaluate RCM concepts, BPA is installing a prototype system at our Alvey Substation on 4 transformers and 25 breakers.

Purucker, S.L.; Goeltz, R.T. [Oak Ridge National Lab., TN (United States); Hemmelman, K.; Price, R. [Bonneville Power Administration, Van Couver, WA (United States)

1992-08-01T23:59:59.000Z

358

Operations and Maintenance Program Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Management Program Management Operations and Maintenance Program Management October 4, 2013 - 5:11pm Addthis Effective management is critical to any operations and maintenance (O&M) program. The management function should bind the distinct parts of the O&M program into a cohesive entity. The following section outlines the major components of effective O&M management, including: Program Structure: Outlines five distinctive functions making up the O&M organization: Operations, Maintenance, Engineering, Training, and Administration (OMETA) Management Support: Details the importance of gaining management support to an effective O&M program, and how to gain that support Program Implementation: Provides an overview of implementing an effective O&M program and how to maintain that program into the future

359

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 4 Computerized Maintenance Chapter 4 Computerized Maintenance � Management System � 4.1 Introduction A computerized maintenance management system (CMMS) is a type of management software that performs functions in support of management and tracking of O&M activities. 4.2 CMMS Needs Assessment In determining the need for a CMMS, facility managers should assess their current mode of operation. Key questions to ask include: * Do you have an effective way to generate and track work orders? How do you verify the work was done efficiently and correctly? What is the notification function upon completion? * Are you able to access historical information on the last time a system was serviced, by whom, and for what condition? * How are your spare-parts inventories managed and controlled? Do you have

360

Request for Information - Operations and Maintenance (O & M) Support  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Information - Operations and Maintenance (O & M) Request for Information - Operations and Maintenance (O & M) Support Services for the iManage Request for Information - Operations and Maintenance (O & M) Support Services for the iManage Request for Information (THIS IS NOT A NOTICE OF SOLICITATION ISSUANCE) This is a Special Notice that includes a Request for Information (RFI) to receive comments regarding the attached draft Performance Work Statement (PWS), notice regarding an upcoming Industry Day, and notice regarding one-on-one conferences. This Special Notice is issued solely for information and planning purposes - it does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. This RFI does not commit the Government to contract for any supply or service

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Pacific Northwest National Laboratory Grounds Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pacific Pacific Northwest National Laboratory (PNNL) operates an award-winning grounds maintenance program that comprises a comprehensive landscape and irrigation management program. The program has helped the laboratory reduce its water use for irrigation by 30%. PNNL is located in Richland, Washington, and is managed and operated by Battelle for the U.S. Department of Energy (DOE). PNNL scientists and engineers perform research on a variety of subjects, including energy and national security. PNNL has more than 4,200 staff members, sits on 600 acres, and houses 2 million square feet of facilities. The laboratory is located in an arid region of the state, receiving only eight inches of precipitation annually. It has more than 100 acres of turf and landscaped areas and

362

Plant maintenance and advanced reactors, 2005  

SciTech Connect

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: First U.S. EPRs in 2015, by Ray Ganthner, Framatome ANP; Pursuing several opportunities, by William E. (Ed) Cummins, Westinghouse Electric Company; Vigorous plans to develop advanced reactors, by Yuliang Sun, Tsinghua University, China; Multiple designs, small and large, by Kumiaki Moriya, Hitachi Ltd., Japan; Sealed and embedded for safety and security, by Handa Norihiko, Toshiba Corporation, Japan; Scheduled online in 2010, by Johan Slabber, PMBR (Pty) Ltd., South Africa; Multi-application reactors, by Nikolay G. Kodochigov, OKBM, Russia; Six projects under budget and on schedule, by David F. Togerson, AECL, Canada; Creating a positive image, by Scott Peterson, Nuclear Energy Institute (NEI); Advanced plans for nuclear power's renaissance, by John Cleveland, International Atomic Energy Agency, Austria; and, Plant profile: last five outages in less than 20 days, by Beth Rapczynski, Exelon Nuclear.

Agnihotri, Newal (ed.)

2005-09-15T23:59:59.000Z

363

Plant maintenance and advanced reactors, 2007  

Science Conference Proceedings (OSTI)

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: A new day for energy in America; Committed to success more than ever, by Andy White, GE--Hitachi Nuclear Energy; Competitive technology for decades, by Steve Tritch, Westinghouse Electric Company; Pioneers of positive community relationship, by Exelon Nuclear; A robust design for 60-years, by Ray Ganthner, Areva; Aiming at no evacuation plants, by Kumiaki Moriya, Hitachi-GE Nuclear Energy, Ltd.; and, Desalination and hydrogen economy, by Dr. I. Khamis, International Atomic Energy Agency. Industry innovation articles in this issue are: Reactor vessel closure head project, by Jeff LeClair, Prairie Island Nuclear Generating Plant; and Submersible remote-operated vehicle, by Michael S. Rose, Entergy's Fitzpatrick Nuclear Station.

Agnihotri, Newal (ed.)

2007-09-15T23:59:59.000Z

364

New ways for terology through predictive maintenance in an environmental perspective  

Science Conference Proceedings (OSTI)

Terology is defined as the combined use of techniques of operational research, information systems and engineering, with the objective of accompanying the life cycle of facilities and equipments; it includes the definition of specifications referred ... Keywords: diesel engines, maintenance management, predictive maintenance, terology, wind generators

Torres Farinha; Inácio Fonseca; António Simões; Maciel Barbosa; José Viegas

2008-07-01T23:59:59.000Z

365

INTOR critical issue D: maintainability. Tritium containment and personnel access vs remote maintenance, Chapter VI of the US INTOR report for Phase Two A, Part 2  

SciTech Connect

The purpose of this study is to compare the benefits and costs associated with personnel access mmaintenance procedures compared to those of all-remote maintenance procedures. The INTOR Phase Two A, Part I configuration was used to make this comparison. For both approaches, capital and operating costs were considered to first order, maintenance equipment requirements were investigated, maintenance requirements common to both approaches and unique to each were identified, tritium handling requirements were outlined, and maintenance scenarios and device downtime were developed for both. In addition, estimates of person-rem exposure were made for the personnel access approach.

Spampinato, P.T.; Finn, P.A.; Gohar, Y.; Yang, S.T.; Stasko, R.R.; Morrison, C.; Russell, S.; Shaw, G.; Bussell, G.T.; Watts, R.

1984-01-01T23:59:59.000Z

366

Electric power monthly, September 1990. [Glossary included  

SciTech Connect

The purpose of this report is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues. The power plants considered include coal, petroleum, natural gas, hydroelectric, and nuclear power plants. Data are presented for power generation, fuel consumption, fuel receipts and cost, sales of electricity, and unusual occurrences at power plants. Data are compared at the national, Census division, and state levels. 4 figs., 52 tabs. (CK)

1990-12-17T23:59:59.000Z

367

NREL: Energy Analysis - Energy Technology Cost and Performance Data for  

NLE Websites -- All DOE Office Websites (Extended Search)

Bookmark and Share Bookmark and Share Energy Technology Cost and Performance Data for Distributed Generation Transparent Cost Database Button Recent cost estimates for distributed generation (DG) renewable energy technologies are available across capital costs, operations and maintenance (O&M) costs, and levelized cost of energy (LCOE). Use the tabs below to navigate the charts. The LCOE tab provides a simple calculator for both utility-scale and DG technologies that compares the combination of capital costs, O&M, performance, and fuel costs. If you are seeking utility-scale technology cost and performance estimates, please visit the Transparent Cost Database website for NREL's information regarding vehicles, biofuels, and electricity generation. Capital Cost (September 2013 Update)

368

Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

This report is the 2011 update of Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems, originally published in 2001 and updated annually. New and revised content this year includes: (1) an analysis of the performance of the U.S. fleet of selective catalytic reduction (SCR)equipped generating units in 2009, 2010, and 2011; (2) a discussion of experience in mitigating the role of arsenic in catalyst deactivation, including the addition of alkali material to the coal; (3) an updat...

2011-12-16T23:59:59.000Z

369

Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3  

Science Conference Proceedings (OSTI)

The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

Leigh, Richard J.

2012-09-01T23:59:59.000Z

370

Maglev guideway cost and construction schedule assessment  

SciTech Connect

A summary of construction cost and scheduling information is presented for four maglev guideway designs on an example route from Baltimore, MD to Newark, NJ. This work results from the National Maglev Initiative (NMI), a government-industry effort from 1989 to 1994. The system design concepts used as a basis for developing cost and construction scheduling information, were submitted by four industry consortia solely for this analysis, and represent their own unpublished designs. The detailed cost and construction schedule analyses cover the main guideway only. A summary estimate was made for stations, power distribution systems, maintenance facilities, and other types of infrastructure. The results of the analyses indicate a number of design aspects which must receive further consideration by future designers. These aspects will affect the practical and economic construction and long-term maintenance of a high-speed maglev guideway.

Plotkin, D.; Kim, S. [Army Construction Engineering Research Lab., Champaign, IL (United States)

1997-05-01T23:59:59.000Z

371

Practical Application of Second Law Costing Methods  

E-Print Network (OSTI)

The key to proper allocation of fuel and feedstock costs to the products from a plant or from any one of its components is the commodity called exergy - the central concept of the Second Law of Thermodynamics, commonly named available energy or availability. The methods for composing exergy cost flow diagrams will be explained. The results will be shown for several plants - electric-power, co-generation, coal-gasification, and others. The application of such results will be shown for cost-accounting, for plant operation economics, for maintenance decisions, and for design decisions - at both the preliminary and detailed design states.

Wepfer, W. J.; Gaggioli, R. A.

1983-01-01T23:59:59.000Z

372

Condition-Based Maintenance Program Coordinator Guideline  

Science Conference Proceedings (OSTI)

Condition-based maintenance (CBM) is an important component of an effective plant equipment reliability (ER) program, and in support of plant activities and undertakings in this area, in 2011 EPRI and an industry Technical Advisory Group (TAG) collaborated to produce the Condition-Based Maintenance Guideline (EPRI product 1022957). That document, a revision of the earlier four-volume Predictive Maintenance Guidelines, clearly defines the CBM process and serves as a core resource on ...

2013-03-28T23:59:59.000Z

373

CAPITAL AND OPERATING COST OF HYDROGEN PRODUCTION FROM COAL GASIFICATI...  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Coal Using Preliminary Assumptions 2-15 2.5.1 Approach to Cost Estimating 2-16 2.5.2 Production Costs (Operation and Maintenance) 2-16 2.5.3 Consumables 2-17 2.5.4 Byproduct...

374

FACILITY MAINTENANCE MANAGEMENT QUALIFICATION STANDARD REFERENCE GUIDE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Facility Maintenance Management Qualification Standard Reference Guide NOVEMBER 2009 Table of Contents i FIGURES...................................................................................................................................... iv TABLES........................................................................................................................................ iv ACRONYMS ................................................................................................................................. v PURPOSE...................................................................................................................................... 1 SCOPE ...........................................................................................................................................

375

Risk-averse periodic preventive maintenance optimization.  

E-Print Network (OSTI)

??We consider a class of periodic preventive maintenance (PM) optimization problems, for a single piece of equipment that deteriorates with time or use, and can… (more)

Singh, Inderjeet,1978-

2011-01-01T23:59:59.000Z

376

Operations and maintenance reports | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

from an expert Take a comprehensive approach Operations and maintenance reports ENERGY STAR Building Upgrade Manual Install renewable energy systems Save water to save energy...

377

Pacific Northwest National Laboratory Grounds Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Pacific Northwest National Laboratory (PNNL) operates an award-winning grounds maintenance program that comprises a comprehensive landscape and irrigation management program. The...

378

Federal Energy Management Program: Predictive Maintenance Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance Technologies on Facebook Tweet about Federal Energy Management Program: Predictive...

379

Empowering Operations and Maintenance through Wireless  

Science Conference Proceedings (OSTI)

Presentation Title, Empowering Operations and Maintenance through Wireless. Author(s), Neil Freeman, Soroush Amidi, David Fisk. On-Site Speaker (Planned)

380

An Analysis of Low Cost, Energy Efficient, Housing for Low-income Residents of How and Humid Climates  

E-Print Network (OSTI)

The purpose of this research is to develop methods that will enable the reduction of owning and operating costs of low-income housing in the hot-humid climates of the U. S. The objectives include investigating various scenarios that will enable the implementation of cost-effective construction of low-income housing using volunteer labor. The research uses a case study approach where a base-line energy use is established using a comparative Princeton Score Keeping Method (PRISM) analysis and measurements from a case study house. A prototype house is then simulated with the DOE-2 building simulation program, and the energy savings calculated by comparing simulated energy and water conservation design measures (E&WCDMs) with the calibrated baseline energy simulation. The cost and maintenance of the house are analyzed with the real cost of construction of a case study house in Bryan/College Station, Texas.

Kootin-Sanwu, Victor

2004-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Technology, Safety and Costs of Decommissioning a Reference Uranium Hexafluoride Conversion Plant  

Science Conference Proceedings (OSTI)

Safety and cost information is developed for the conceptual decommissioning of a commercial uranium hexafluoride conversion (UF{sub 6}) plant. Two basic decommissioning alternatives are studied to obtain comparisons between cost and safety impacts: DECON, and passive SAFSTOR. A third alternative, DECON of the plant and equipment with stabilization and long-term care of lagoon wastes. is also examined. DECON includes the immediate removal (following plant shutdown) of all radioactivity in excess of unrestricted release levels, with subsequent release of the site for public use. Passive SAFSTOR requires decontamination, preparation, maintenance, and surveillance for a period of time after shutdown, followed by deferred decontamination and unrestricted release. DECON with stabilization and long-term care of lagoon wastes (process wastes generated at the reference plant and stored onsite during plant operation} is also considered as a decommissioning method, although its acceptability has not yet been determined by the NRC. The decommissioning methods assumed for use in each decommissioning alternative are based on state-of-the-art technology. The elapsed time following plant shutdown required to perform the decommissioning work in each alternative is estimated to be: for DECON, 8 months; for passive SAFSTOR, 3 months to prepare the plant for safe storage and 8 months to accomplish deferred decontamination. Planning and preparation for decommissioning prior to plant shutdown is estimated to require about 6 months for either DECON or passive SAFSTOR. Planning and preparation prior to starting deferred decontamination is estimated to require an additional 6 months. OECON with lagoon waste stabilization is estimated to take 6 months for planning and about 8 months to perform the decommissioning work. Decommissioning cost, in 1981 dollars, is estimated to be $5.91 million for OECON. For passive SAFSTOR, preparing the facility for safe storage is estimated to cost $0.88 million, the annual maintenance and surveillance cost is estimated to be about $0.095 million, and deferred decontamination is estimated to cost about $6.50 million. Therefore, passive SAFSTOR for 10 years is estimated to cost $8.33 million in nondiscounted 1981 dollars. DECON with lagoon waste stabilization is estimated to cost about $4.59 million, with an annual cost of $0.011 million for long-term care. All of these estimates include a 25% contingency. Waste management costs for DECON, including the net cost of disposal of the solvent extraction lagoon wastes by shipping those wastes to a uranium mill for recovery of residual uranium, comprise about 38% of the total decommissioning cost. Disposal of lagoon waste at a commercial low-level waste burial ground is estimated to add $10.01 million to decommissioning costs. Safety analyses indicate that radiological and nonradiological safety impacts from decommissioning activities should be small. The 50-year committed dose equivalent to members of the public from airborne releases during normal decommissioning activities is estimated to 'Je about 4.0 man-rem. Radiation doses to the public from accidents are found to be very low for all phases of decommissioning. Occupational radiation doses from normal decommissioning operations (excluding transport operations) are estimated to be about 79 man-rem for DECON and about 80 man-rem for passive SAFSTOR with 10 years of safe storage. Doses from DECON with lagoon waste stabilization are about the same as for DECON except there is less dose resulting from transportation of radioactive waste. The number of fatalities and serious lost-time injuries not related to radiation is found to be very small for all decommissioning alternatives. Comparison of the cost estimates shows that DECON with lagoon waste stabilization is the least expensive method. However, this alternative does not allow unrestricted release of the site. The cumulative cost of maintenance and surveillance and the higher cost of deferred decontamination makes passive SAFSTOR more expensive than DECON. Seve

Elder, H. K.

1981-10-01T23:59:59.000Z

382

Societal lifetime cost of hydrogen fuel cell vehicles  

E-Print Network (OSTI)

change, and noise. Oil-use costs comprise the cost of theexcept as indicated) Oil-use cost SPR Low Best High BY ROCdirect economic costs of oil dependence – including wealth

Sun, Yongling; Ogden, J; Delucchi, Mark

2010-01-01T23:59:59.000Z

383

maintenance. This research is relevant to opera-tions and maintenance challenges facing aging  

E-Print Network (OSTI)

maintenance. This research is relevant to opera- tions and maintenance challenges facing aging to make equipment last longer.Economic pressures to maintain aging fleets of commercial and military

384

Estimate Costs to Implement Greenhouse Gas Mitigation Strategies Using  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Costs to Implement Greenhouse Gas Mitigation Strategies Costs to Implement Greenhouse Gas Mitigation Strategies Using Renewable Energy in Buildings Estimate Costs to Implement Greenhouse Gas Mitigation Strategies Using Renewable Energy in Buildings October 7, 2013 - 11:25am Addthis After determining the best greenhouse gas (GHG) reduction strategies using renewable energy, a Federal agency should estimate the cost of implementing them in a building or buildings. There are several cost factors that need to be considered when developing a renewable energy project. Capital costs, fixed and variable operations and maintenance (O&M) costs and in the case of biomass and waste-to-energy projects, fuel costs all contribute to the total cost of operating a renewable energy system. The levelized system cost takes into account these

385

Nuclear Maintenance Applications Center: The Flowserve and Sulzer Reactor Coolant Pump Seal Maintenance Guide  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) report Main Coolant Pump Seal Maintenance Guide (TR-100855) was published in 1993. That report provided guidance on maintenance and troubleshooting of main coolant pump seals, but it was genericthe information was relevant to both PWRs and BWRs. By providing more current information, this report replaces the EPRI report Main Coolant Pump Seal Maintenance Guide.

2011-03-28T23:59:59.000Z

386

Nuclear Maintenance Applications Center: Vertical Pump Maintenance Guide -- Update to EPRI Report 1003467  

Science Conference Proceedings (OSTI)

Results from several annual Electric Power Research Institute (EPRI) Nuclear Maintenance Applications Center (NMAC) maintenance issues surveys indicate that members are experiencing difficulties with various maintenance issues associated with vertical pumps. Some of the problems identified a need for information and assistance with pump and motor ...

2012-10-15T23:59:59.000Z

387

Production Cost Optimization Assessments  

Science Conference Proceedings (OSTI)

The benefits of improved thermal performance of coal-fired power plants continue to grow, as the costs of fuel rise and the prospect of a carbon dioxide cap and trade program looms on the horizon. This report summarizes the efforts to date of utilities committed to reducing their heat rate by 1.0% in the Production Cost Optimization (PCO) Project. The process includes benchmarking of plant thermal performance using existing plant data and a site-specific performance appraisal. The appraisal determines po...

2008-12-11T23:59:59.000Z

388

17.2 - Cost Participation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17.2 (June 2004) 17.2 (June 2004) 1 Cost Participation [Reference: FAR 35.003(b), DEAR 917.70] Overview This section discusses DOE treatment of cost participation by organizations performing research, development, and demonstration projects under DOE prime contracts. This section does not cover efforts and projects performed for DOE by other Federal agencies. Background Cost participation is a generic term denoting any situation where the Government does not fully reimburse the contractor for all allowable costs necessary to accomplish the project or effort under the contract. The term includes, but is not limited to: * Cost Sharing * Cost Matching * Cost Limitation, which may be direct or indirect * Participation in-kind

389

DOE Order Self Study Modules - DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3.1B 3.1B MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES DOE O 433.1B Familiar Level August 2011 1 DOE O 433.1B MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES FAMILIAR LEVEL OBJECTIVES Given the familiar level of this module and the resources, you will be able to answer the following questions: 1. What is the objective of DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities? 2. What is the purpose for quantitative indicators in maintenance management? 3. What are three types of environmental controls included in a maintenance shop? 4. What is the relationship between DOE G 433.1-1 and DOE O 433.1A? 5. What is the purpose for post-maintenance testing? 6. What is the objective of a good equipment maintenance history program?

390

Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2  

SciTech Connect

This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or documented ? Provides instructions for implementing annual S&M inspections and activities The following facilities that were included in Revision 1 of this plan have reached final disposition and are no longer in the S&M program: ? Reactor Maintenance, Assembly, and Disassembly Facility, Building 25-3110 ? Test Cell A Facility, Building 25-3113 ? TCC Facility, Building 25-3210 ? Pluto Disassembly Facility, Building 26-2201 ? Super Kukla Facility, Building 27-5400

Poderis, Reed J. [NSTec] [NSTec; King, Rebecca A. [NSTec] [NSTec

2013-09-30T23:59:59.000Z

391

Void Fraction Instrument operation and maintenance manual  

SciTech Connect

This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

1994-09-01T23:59:59.000Z

392

Protective Relay Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

Protective relays are decision-making elements in the protection scheme for electrical power systems. A strong test and maintenance program will keep protective relays in a high state of readiness and help utilities avoid equipment damage and prolonged downtime. This guide provides recommended practices for maintenance and testing of these relays.

1993-10-02T23:59:59.000Z

393

Value-Based Operations and Maintenance Practices  

Science Conference Proceedings (OSTI)

Utilities can maximize the net corporate value of their operating and maintenance practices through a systematic approach that employs decision analysis techniques and marginal-value analysis. In a case study that confirmed the merit of the value-based approach, Duke Power Company developed and tested decision trees for specific predictive maintenance scenarios.

1995-04-14T23:59:59.000Z

394

Power Supply Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

Instrument power supplies are very reliable; however, there is limited information that ties together operating history, maintenance practices, and data associated with repairing versus replacing power supplies. Also, the issue of equipment obsolescence affects many of the considerations associated with making power supply maintenance decisions.

2001-12-21T23:59:59.000Z

395

Operation and Maintenance Guidelines for Draft Fans  

Science Conference Proceedings (OSTI)

The reliability, efficiency, and safety of draft fans in fossil fuel power plants depend on effective operating and maintenance practices. These guidelines systematically present state-of-the-art techniques that utility personnel can use in operation, maintenance, troubleshooting, inspection, and weld repair of major fan components and auxiliary systems.

1999-05-13T23:59:59.000Z

396

Information Technology for Energy and Maintenance Management  

E-Print Network (OSTI)

We describe the design of a tenant interface for energy and maintenance systems (TIEMS) in commercial buildings. TIEMS is designed for use by occupants (tenants) of commercial buildings. Our hypothesis is that by allowing tenants access to information from the energy and maintenance systems and by giving them some control over these systems, energy and maintenance performance can be improved. We used interviews with potential users and existing energy and maintenance databases to guide the design. Results of a field trial demonstrate the utility of TIEMS. We also describe the design of a maintenance and operations recommender (MORE). MORE uses information from computerized maintenance management systems (CMMS) and energy management and control systems (EMCS) to recommend what maintenance personnel should do in response to a maintenance service request. MORE integrates text descriptions of problems with sensor information related to the problem. After work orders are closed, MORE uses the information about what was actually done to solve the problem to learn how to improve its recommendations.

Villafana, L.; Federspiel, C.

2003-01-01T23:59:59.000Z

397

Potential Operation and Maintenance (O&M) Savings at the Dunbar Middle and Sims Elementary Schools  

E-Print Network (OSTI)

This report presents the results of a study of the potential cost savings which may be achieved by improving operational and maintenance (O&M) practices at Dunbar Middle School and Sims Elementary School in the Fort Worth Independent School District. This report discusses the methodology used to identify the O&M measures and summarizes the potential savings of these measures.

Liu, M.; Houcek, J. K.; Claridge, D. E.; Haberl, J. S.

1993-01-01T23:59:59.000Z

398

The maintenance of equipment painting in maritime oil platforms is an expensive and  

E-Print Network (OSTI)

to the platform in order to evaluate the conditions of the equipment, estimate the necessary amount of paint on the platform, simplifying and reducing the costs of the process. This work presents the solution createdAbstract The maintenance of equipment painting in maritime oil platforms is an expensive

Barbosa, Alberto

399

The Work Control Process Module in Support of a Living Maintenance Program  

Science Conference Proceedings (OSTI)

This technical report shows how to manage the risks associated with work control issues that effect the safety, reliability, and O&M costs of a nuclear plant. It also addresses how to increase communications and improve group dynamics between operations, maintenance, and planning/scheduling personnel to assist in the practical use of the Work Control Process.

1997-10-30T23:59:59.000Z

400

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations and Maintenance Program Areas » Operations and Maintenance Operations and Maintenance October 4, 2013 - 5:07pm Addthis Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be maintained and operated correctly to reach their full potential. Well-executed operations and maintenance (O&M) programs promote energy efficiency and life cycle performance and can save Federal agencies 5% to 20% on annual energy bills without significant capital investments. Learn about: Federal Requirements: Look up O&M-related requirements that Federal agencies must meet as outlined by law and executive order Management Process: Learn about the operations and maintenance management process Commissioning: Get an overview of commissioning processes

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Types of Costs Types of Cost Estimates  

E-Print Network (OSTI)

05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408) costs apply to those items that are consumed in production process and are roughly proportional to level in cash flow analysis and in the decision to use the equipment for reclamation? Types of Costs #12

Boisvert, Jeff

402

The International Coal Statistics Data Base program maintenance guide  

SciTech Connect

The International Coal Statistics Data Base (ICSD) is a microcomputer-based system which contains information related to international coal trade. This includes coal production, consumption, imports and exports information. The ICSD is a secondary data base, meaning that information contained therein is derived entirely from other primary sources. It uses dBase III+ and Lotus 1-2-3 to locate, report and display data. The system is used for analysis in preparing the Annual Prospects for World Coal Trade (DOE/EIA-0363) publication. The ICSD system is menu driven and also permits the user who is familiar with dBase and Lotus operations to leave the menu structure to perform independent queries. Documentation for the ICSD consists of three manuals -- the User's Guide, the Operations Manual, and the Program Maintenance Manual. This Program Maintenance Manual provides the information necessary to maintain and update the ICSD system. Two major types of program maintenance documentation are presented in this manual. The first is the source code for the dBase III+ routines and related non-dBase programs used in operating the ICSD. The second is listings of the major component database field structures. A third important consideration for dBase programming, the structure of index files, is presented in the listing of source code for the index maintenance program. 1 fig.

Not Available

1991-06-01T23:59:59.000Z

403

INDEPENDENT COST REVIEW (ICR)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

404

INDEPENDENT COST REVIEW (ICR)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

405

Technologies for Plant Operations and Maintenance Support: A Plan for Technology Development and Implementation  

Science Conference Proceedings (OSTI)

Electronic performance support systems (EPSSs) have important potential for increasing the efficiency and quality of operations and maintenance (O&M) work. This report cites a series of rapidly evolving technologies for possible application in nuclear power plants, including technologies that can assist in the shrinking workforce problem for the nuclear power industry. Also included is a futuristic scenario of a maintenance technician using several of these new technologies to perform daily tasks efficie...

2002-03-25T23:59:59.000Z

406

Federal Energy Management Program: Reliability-Centered Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Reliability-Centered Maintenance to someone by E-mail Share Federal Energy Management Program: Reliability-Centered Maintenance on Facebook Tweet about Federal Energy Management Program: Reliability-Centered Maintenance on Twitter Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Google Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Delicious Rank Federal Energy Management Program: Reliability-Centered Maintenance on Digg Find More places to share Federal Energy Management Program: Reliability-Centered Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems

407

Federal Energy Management Program: Operations and Maintenance Contacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Contacts to someone by E-mail Contacts to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Contacts on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Contacts on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Google Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Delicious Rank Federal Energy Management Program: Operations and Maintenance Contacts on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Contacts on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types

408

New England Wind Forum: Cost Trends  

Wind Powering America (EERE)

Cost Trends Cost Trends Figure 1: Cost of Energy and Cumulative Domestic Capacity This graph shows how the cumulative domestic wind capacity (MW) has increased since 1980, while the cost of energy from wind power has declined by a factor of approximately 20 times during the same period but has increased slightly since 2001. Click on the image to view a larger version. This graph shows how the cumulative domestic wind capacity (MW) has increased since 1980, while the cost of energy from wind power has declined by a factor of approximately 20 times during the same period but has increased slightly since 2001. View a larger version of the graph. Overall, the wind industry is experiencing long-term decreases in the cost to produce wind-generated electricity (Figure 1), despite recent short-term increases in upfront equipment costs. Even in the short term, however, the effect of increases in up-front capital costs on the cost of energy from wind power projects has been dampened by improvements in energy capture from the wind and decreases in operating and maintenance costs.

409

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration  

Science Conference Proceedings (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

410

EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING  

Science Conference Proceedings (OSTI)

The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

Harris, S.; Gross, R.; Mitchell, E.

2011-01-18T23:59:59.000Z

411

Requirements for low cost electricity and hydrogen fuel production from multi-unit intertial fusion energy plants with a shared driver and target factory  

E-Print Network (OSTI)

steam generators (SG),steam turbines(T), generators andawith the costs of modern steam turbine generator plants forSteam generators Remote maintenance equipment Turbine plant

Logan, B. Grant; Moir, Ralph; Hoffman, Myron A.

1994-01-01T23:59:59.000Z

412

Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

This document is the 2010 version of Operation and Maintenance Guidelines for Selective Catalytic Reduction Systems, originally published in 2001 and updated annually. New content this year includes: (1) A section on static mixers added in Chapter 3; (2) Substantial expansion of the discussion on inspection of ammonia storage and delivery equipment in Chapter 8; (3) Expanded coverage of unit startup, shutdown, and low-load operation in Chapter 15; (4) a new chapter, Chapter 18, on the means to ensure tha...

2010-11-29T23:59:59.000Z

413

Lube Oil Predictive Maintenance, Handling, and Quality Assurance Guideline  

Science Conference Proceedings (OSTI)

This guideline has been prepared by EPRI to assist member utilities in the improvement of maintenance processes. It presents the key elements that should be included in conducting comprehensive lubrication program evaluations and in setting up a well-organized lubrication program. EPRI believes that utilities can make organizational and procedural improvements that will yield optimal lubrication programs. This guideline also serves as an excellent reference document because it describes key lubrication t...

2002-12-18T23:59:59.000Z

414

Guidelines for Developing a Preventive Maintenance (PM) Program: Identifying, Prioritizing, and Implementing PM Tasks: Summary of Le ssons Learned for Maintenance Basis Optimization on Fossil, Combined-Cycle, Co Generation, and Renewable Assets  

Science Conference Proceedings (OSTI)

Power generation utilities are under continued and increased pressure to reduce power generation costs while increasing equipment reliability. In addition, the industry’s aging engineering and maintenance work force is being replaced with less-experienced personnel; therefore, capturing the knowledge and information for sustaining and continuously improving the preventive maintenance (PM) task bases and the overall PM program are critical pieces to meeting these challenges.Over the ...

2012-12-12T23:59:59.000Z

415

Africa's Transport Infrastructure Mainstreaming Maintenance and  

Open Energy Info (EERE)

Africa's Transport Infrastructure Mainstreaming Maintenance and Africa's Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management Agency/Company /Organization: World Bank Complexity/Ease of Use: Not Available Website: www.infrastructureafrica.org/system/files/Africa%27s%20Transport%20Inf Transport Toolkit Region(s): Africa & Middle East Related Tools The BEST Experiences with Bioethanol Buses The Sourcebook on Sustainable Urban Transport Alternative Fuels and Advanced Vehicles Data Center ... further results Find Another Tool FIND TRANSPORTATION TOOLS Transport infrastructure is a key requirement for economic growth. In Africa today, networks are sparse, conditions poor, transit slow and

416

PAFC Cost Challenges  

NLE Websites -- All DOE Office Websites (Extended Search)

PAFC Cost Challenges Sridhar Kanuri Manager, PAFC Technology *Sridhar.Kanuri@utcpower.com 2 AGENDA Purecell 400 cost challenge Cost reduction opportunities Summary 3 PURECELL ...

417

Solar heating and hot water system installed at the Senior Citizen Center, Huntsville, Alabama. [Includes engineering drawings  

DOE Green Energy (OSTI)

Information is provided on the solar energy system installed at the Huntsville Senior Citizen Center. The solar space heating and hot water facility and the project involved in its construction are described in considerable detail and detailed drawings of the complete system and discussions of the planning, the hardware, recommendations, and other pertinent information are included. The facility was designed to provide 85 percent of the hot water and 85 percent of the space heating requirements. Two important factors concerning this project for commercial demonstration are the successful use of silicon oil as a heat transfer fluid and the architecturally aesthetic impact of a large solar energy system as a visual centerpoint. There is no overheat or freeze protection due to the characteristics of the silicon oil and the design of the system. Construction proceeded on schedule with no cost overruns. It is designed to be relatively free of scheduled maintenance, and has experienced practically no problems.

Not Available

1980-02-01T23:59:59.000Z

418

Nuclear Maintenance Applications Center: Reactor Coolant Pump/Reactor Recirculation Pump Motor Lubrication Oil Systems Maintenance G uide  

Science Conference Proceedings (OSTI)

RCP and RRP Motor Lubrication system issues have ranked high on NMAC maintenance Issues Surveys in recent years. Problems reported have included oil leakage at power, the need for additional reservoirs to accommodate leakage, oil degradation (foaming, particulate) as well as sludge problems due to the design of the motor and some as a result of new oil formulations and other changes made by the oil suppliers. Reactor Coolant Pumps (RCP) used in Pressurized Water Reactors and Reactor Recirculation Pumps ...

2006-12-22T23:59:59.000Z

419

National Synchrotron Light Source Facility Manual Maintenance Management Program. Revision 1  

SciTech Connect

The purpose of this program s to meet the policy and objectives for the management and performance of cost-effective maintenance and repair of the National Synchrotron Light Source, as required by the US Department of Energy order DOE 433O.4A. It is the DOE`s policy that: The maintenance management program for the NSLS be consistent with this Order and that NSLS property is maintained in a manner which promotes operational safety, worker health, environmental protection and compliance, property preservation, and cost-effectiveness while meeting the NSLS`s programmatic mission. Structures, components and systems (active and passive) that are imporant to safe operation of the NSLS shall be subject to a maintenance program to ensure that they meet or exceed their design requirements throughout the life of the NSLS. Periodic examination of structures, systems components and equipment be performed to determine deterioration or technical obsolescence which may threaten performance and/or safety. Primary responsibility, authority, and accountability for the direction and management of the maintenance program at the NSLS reside with the line management assigned direct programmatic responsibility. Budgeting and accounting for maintenance programs are consistent with DOE Orders guidance.

Fewell, N.

1993-12-01T23:59:59.000Z

420

Alternative Fuels Data Center: Vehicle Cost Calculator  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Cost Vehicle Cost Calculator to someone by E-mail Share Alternative Fuels Data Center: Vehicle Cost Calculator on Facebook Tweet about Alternative Fuels Data Center: Vehicle Cost Calculator on Twitter Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator on Google Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator on Delicious Rank Alternative Fuels Data Center: Vehicle Cost Calculator on Digg Find More places to share Alternative Fuels Data Center: Vehicle Cost Calculator on AddThis.com... Vehicle Cost Calculator Vehicle Cost Calculator This tool uses basic information about your driving habits to calculate total cost of ownership and emissions for makes and models of most vehicles, including alternative fuel and advanced technology vehicles. Also

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Development of computer-aided maintenance resources planning (CAMRP): A case of multiple CNC machining centers  

Science Conference Proceedings (OSTI)

Total productive maintenance (TPM), total maintenance assurance, preventive maintenance, reliability-centered maintenance (RCM), and many other innovative approaches to maintenance problems all aim at enhancing the effectiveness of machines to ultimately ... Keywords: Maintenance, Resources planning, Theory of constraints

J. Ashayeri

2007-12-01T23:59:59.000Z

422

Plant maintenance and advanced reactors issue, 2008  

Science Conference Proceedings (OSTI)

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.

Agnihotri, Newal (ed.)

2009-09-15T23:59:59.000Z

423

Maintenance scheduling for modular systems-models and algorithms  

E-Print Network (OSTI)

Maintenance scheduling is an integral part of many complex systems. For instance, without effective maintenance scheduling, the combined effects of preventative and corrective maintenance can have severe impacts on the ...

Zarybnisky, Eric J. (Eric Jack), 1979-

2011-01-01T23:59:59.000Z

424

FINAL REPORT: PHASE FOUR HIGHWAY MAINTENANCE CONCEPT VEHICLE  

E-Print Network (OSTI)

the maintenance management system. Phase IV has two major strands, technical and financial. The outcome of Phase ................................................................................................................. 55 AMS-200 (Application Management System) Console innovation in highway maintenance management, maintenance operations practices, and research. CTRE provided

Beresnev, Igor

425

Information Management, Analytics & Optimization Services IMS System Maintenance Service Offering  

E-Print Network (OSTI)

Information Management, Analytics & Optimization Services IMS System Maintenance Service Offering The IMS System Maintenance Review offering is a special service offering from the IMS laboratory Technical Specialist group. Complex IMS systems require periodic maintenance, coupled with a specific testing process

426

Pulverizer Maintenance Guide, Volume 2: Babcock & Wilcox Roll Wheel Pulverizers  

Science Conference Proceedings (OSTI)

The "Pulverizer Maintenance Guide, Volume 2: B&W Roll Wheel™ Pulverizers" provides fossil plant personnel with current maintenance information on this specific mill design. This guide will assist a plant in improving the maintenance of their pulverizer mills.

2004-12-22T23:59:59.000Z

427

The effects of ergonomic stressors on process tool maintenance and utilization  

SciTech Connect

This study examines ergonomic stressors associated with front-end process tool maintenance, relates them to decreased machine utilization, and proposes solution strategies to reduce their negative impact on productivity. Member company ergonomists observed technicians performing field maintenance tasks on seven different bottleneck tools and recorded ergonomic stressors using SEMaCheck, a graphics-based, integrated checklist developed by Sandia National Laboratories. The top ten stressors were prioritized according to a cost formula that accounted for difficulty, time, and potential errors. Estimates of additional time on a task caused by ergonomic stressors demonstrated that machine utilization could be increased from 6% to 25%. Optimal solution strategies were formulated based on redesign budget, stressor cost, and estimates of solution costs and benefits

Miller, D.

1998-03-31T23:59:59.000Z

428

The Full Cost Of Intercity Transportation - A Comparison Of High Speed Rail, Air And Highway Transportation In California  

E-Print Network (OSTI)

cost of transportation today, including the social costs ofIntercity Transportation Page 2-17 Social Costs - additionalsurrounding social costs and transportation, in particular

Levinson, David; Gillen, David; Kanafani, Adib; Mathieu, Jean-michel

1996-01-01T23:59:59.000Z

429

2010 Cost of Wind Energy Review  

DOE Green Energy (OSTI)

This document provides a detailed description of NREL's levelized cost of wind energy equation, assumptions and results in 2010, including historical cost trends and future projections for land-based and offshore utility-scale wind.

Tegen, S.; Hand, M.; Maples, B.; Lantz, E.; Schwabe, P.; Smith, A.

2012-04-01T23:59:59.000Z

430

LED Light Fixture Project FC1 Director's Conference Room: Life Cycle Cost and Break-even Analysis  

E-Print Network (OSTI)

LED Light Fixture Project ­ FC1 Director's Conference Room: Life Cycle Cost and Break-even Analysis. #12;LED Light Fixture Project ­ FC1 Director's Conference Room: Life Cycle Cost and Break,812 Maintenance Cost $620 $0 $97 $0 Life Cycle Cost $1,787 $1,693 $2,980 $2,980 #12;LED Light Fixture Project ­ FC

Hofmann, Hans A.

431

2 Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3  

E-Print Network (OSTI)

and Capital Costs Drive Wind Power Prices . . . . .20 Installed Project Costs Continued to Rise in 2007, After. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21 Project Cost Increases Are a Function of Turbine Prices, and Turbine Prices Have Increased . . . . . . . . . . . . . . .23 Operations and Maintenance Costs Are Affected by the Age and Size of the Project, Among Other

432

Implementing lean methodologies within a maintenance organization  

E-Print Network (OSTI)

The primary goal of the project was to make the machine maintenance process more efficient. In order to do this, we conducted a 3-day Value Stream Mapping workshop, during which we generated a map of the present value ...

Levine, Dana Ari

2009-01-01T23:59:59.000Z

433

Infrared Thermometry in Winter Road Maintenance  

Science Conference Proceedings (OSTI)

There is significant interest among road authorities in measuring pavement conditions to perform appropriate winter road maintenance. The most common monitoring methods are based on pavement-mounted sensors. This study’s hypothesis is that the ...

Patrik Jonsson; Mats Riehm

2012-06-01T23:59:59.000Z

434

Steam Turbine Hydraulic Control system Maintenance Guide  

Science Conference Proceedings (OSTI)

Steam turbine hydraulic control system maintenance problems have been a significant factor in plant power reductions, shutdowns, and lost generation. This guide provides recommendations to improve the reliability of the hydraulic components and fluid.

1996-12-31T23:59:59.000Z

435

Low-Maintenance Wind Power System  

E-Print Network (OSTI)

with widespread adoption of wind energy. The project hasProject: Low-Maintenance Wind Power System Summary of theImproved Vertical Axis Wind Turbine and Aerodynamic Control

Rasson, Joseph E

2010-01-01T23:59:59.000Z

436

Optimization Online - Optimizing Preventive Maintenance Models  

E-Print Network (OSTI)

Jun 29, 2004 ... Optimizing Preventive Maintenance Models ... It is assumed that there is a known model which predicts the frequency of system failure as a function of ... Category 2: Applications -- OR and Management Sciences (Scheduling ).

437

An object oriented testing and maintenance environment  

Science Conference Proceedings (OSTI)

The object-oriented (OO) paradigm enjoys increasing acceptance in the software industry. Although the OO paradigm has visible benefits in the development cycle, testing and maintenance of OO programs have been considered challenging tasks by the research ...

David C. Kung; Jerry Gao; Pei Hsia

1994-10-01T23:59:59.000Z

438

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Management Effective management is critical to any operations and maintenance (O&M) program. The management function should bind the distinct parts of the O&M program into...

439

Realistic costs of carbon capture  

Science Conference Proceedings (OSTI)

There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

2009-07-01T23:59:59.000Z

440

Costs in the Norwegian Payment System  

E-Print Network (OSTI)

We calculate social and private cost for the use and production of payment services in Norway for 2007. The calculations include banks’, merchants ’ and households ’ cost for cash, cards and giro payments. The social cost is calculated to be 0.49 % of GDP, or NOK 11.16 billion. Costs are also calculated on a per-service basis. The results are compared with data from earlier cost surveys by Norges Bank. The unit costs of the most popular services have decreased over the years. Efficiency and productivity of banks ’ payment service operations has improved. We also make comparisons between frameworks, methodologies, and results from cost surveys in five European countries.

Olaf Gresvik; Harald Haare; Norges Bank; Sigbjørn Atle Berg; Gunnvald Grønvik; Asbjørn Enge

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Fossil Maintenance Basis Optimization: Challenges and Strategies  

Science Conference Proceedings (OSTI)

This report covers many of the process challenges and strategies that were encountered and deployed during the implementation and execution of a preventive maintenance basis optimization (MBO) process at fossil generating stations. This MBO process was executed by several Electric Power Research Institutemember (EPRI-member) companies on a fleetwide basis as part of the members' plant reliability optimization (PRO) efforts. The PRO process covers many of the preventive maintenance (PM) programs at multip...

2010-05-27T23:59:59.000Z

442

Solar Photovoltaic System Operations and Maintenance  

Science Conference Proceedings (OSTI)

Grid-connected flat plate solar photovoltaic (PV) systems are being deployed at an accelerating rate worldwide. Representing a growing absolute share of both independent power producer (IPP) and utility generation portfolios, these PV assets are now commanding a greater level of attention to ensure their optimal availability and performance. Contrary to popular belief, PV power plants are not maintenance free; in fact, they require a steady diet of scheduled preventive maintenance and unscheduled service...

2011-12-22T23:59:59.000Z

443

Minimum Changeover Cost Arborescence  

E-Print Network (OSTI)

having minimum changeover cost, a cost that we now describe. ... We define the changeover cost at j, denoted by d(j), as the sum of the costs at j paid for each of  ...

444

Nuclear Maintenance Applications Center: Switchyard Equipment Application and Maintenance Guide  

Science Conference Proceedings (OSTI)

BackgroundNuclear power plants have safety- and non-safety-related electric buses powered by their preferred power source, which is the local transmission system and might include some distribution circuits. These plants have been given more responsibility for ensuring the reliability of their connection to the grid. Regional and federal reliability standards are in place and must be adhered to under enforceable ...

2012-12-05T23:59:59.000Z

445

Federal Energy Management Program: Resources on Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Resources on Resources on Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Resources on Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Resources on Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Google Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Delicious Rank Federal Energy Management Program: Resources on Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Resources on Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning

446

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance Program Structure to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Structure on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Structure on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Structure on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Structure on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements

447

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance Program Implementation to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Implementation on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Implementation on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Implementation on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Implementation on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

448

Joint Maintenance Status Report of Potomac Electric Power Company...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

449

Requirements-Based Surveillance and Maintenance Review Guide...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Maintenance Review Guide Appendix A - Requirements-Based Surveillance and Maintenance Review Implementation Process, Process Flow Chart and the Flow Chart Footnotes...

450

Attention to maintenance is key to longer battery life  

SciTech Connect

A unique way for battery maintenance on electric truck is described. This system is involved in multi-shift operation entailing battery changing, charging, and programed maintenance.

1975-08-01T23:59:59.000Z

451

The effects of the implementation of grey water reuse systems on construction cost and project schedule  

E-Print Network (OSTI)

One of the factors emphasized by Leadership in Energy and Environmental Design (LEED), a national consensus-based standard under the United States Green Building Council (USGBC) for developing sustainable or high performance buildings, is water efficiency. A LEED registered project can attain up to five points under water efficiency upon successful integration of various techniques to conserve water. Many techniques are available to conserve water and grey water reuse is one option considered by many LEED registered projects. In spite of widespread popularity, some of the sustainable techniques including grey water reuse, which is recommended by the USGBC and various agencies engaged in green building constructions, are not viable in many parts of the United States due to their effects on construction cost and project schedules. Even though a project could get one or multiple points upon successful implementation of a grey water reuse system and conserving potable water, the following factors may have a positive or negative effect on the design team’s decision to implement a grey water reuse system: capital cost, maintenance cost, LEED credits, local plumbing codes, project schedule, local water conservation issues, complexity of the system, etc. Implementation of a grey water reuse system has a significant effect on the capital cost of a project. The increase in cost may be attributed to dual sanitary and grey water distribution piping which doubles construction piping costs. Disinfection treatment, filtration, overflow protection, grey water storage tanks, etc. also add to the cost of construction. Ninety percent of the projects claim that project schedule is not affected by the implementation of a grey water reuse system in a green building project. The factors which prevent the project team from implementing a grey water reuse system include capital cost, maintenance cost, local plumbing codes, local water conservation issues, complexity of the system, etc. LEED credits and the spirit of sustainability are the factors which have a positive effect on the design team’s decision to implement a grey water reuse system.

Kaduvinal Varghese, Jeslin

2007-08-01T23:59:59.000Z

452

A Portable Expert System for Gas Turbine Maintenance  

E-Print Network (OSTI)

Combustion turbines for electric power generation and industrial applications have steadily increased in size, efficiency and prominence. The newest class of gas turbine-generators coming into service will deliver 150 megawatts, with turbine inlet temperatures of 2300° F. To sustain high levels of performance and reliability of this equipment, diagnostics and maintenance planning have also become increasingly important. Within the electric power industry, for example, as the overall fleet of gas turbines has aged, their annual service factor has increased to carry more of the peak load burden as reserve margins shrink. However, peaking duty requires frequent cycling with large thermal stresses that tend to shorten the life of hot section components. To assist the industry in meeting these needs, EPRI has developed The SA?VANT™ System. This unique multi-faceted portable unit will apply a broad range of expert systems in the workplace for power plant maintenance, including turbomachinery of all types, but especially for gas turbines.

Quentin, G. H.

1989-09-01T23:59:59.000Z

453

An overview of time-based and condition-based maintenance in industrial application  

Science Conference Proceedings (OSTI)

This paper presents an overview of two maintenance techniques widely discussed in the literature: time-based maintenance (TBM) and condition-based maintenance (CBM). The paper discusses how the TBM and CBM techniques work toward maintenance decision ... Keywords: Condition-based maintenance, Industrial application, Maintenance decision making, Maintenance techniques, Preventive maintenance, Time-based maintenance

Rosmaini Ahmad; Shahrul Kamaruddin

2012-08-01T23:59:59.000Z

454

Nuclear Maintenance Applications Center: Generator Maintenance Guide for Emergency Diesel Generators (Japanese Version)  

Science Conference Proceedings (OSTI)

This report is a Japanese translation of Electric Power Research Institute (EPRI) Technical Report 1021479. EPRI developed this report to address maintenance and improve long-term reliability and availability of generators within nuclear power plant emergency diesel generator (EDG) systems. Maintenance of generator stators and rotors is the focus of this report, which highlights maintenance tasks and strategies that can be performed to identify generator degradation and prevent unforeseen failures. This ...

2012-03-21T23:59:59.000Z

455

Nuclear Maintenance Applications Center: Maintenance Engineering Fundamentals for Nuclear Utility Personnel - Student Handbook  

Science Conference Proceedings (OSTI)

This EPRI report is the student handbook for participants in a training course on maintenance engineering fundamentals for nuclear utility personnel. The training course was developed in conjunction with EPRI report 1015307, Nuclear Maintenance Applications Center: Maintenance Engineer Fundamentals Handbook. Among the materials in the student handbook are an overview of the entire course; lists of pertinent definitions, acronyms, and resource materials; summaries of learning objectives and key points for...

2008-12-22T23:59:59.000Z

456

Vehicle Investment and Operating Costs and Savings for Greenhouse Gas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vehicle Investment and Operating Costs and Savings for Greenhouse Vehicle Investment and Operating Costs and Savings for Greenhouse Gas Mitigation Strategies Vehicle Investment and Operating Costs and Savings for Greenhouse Gas Mitigation Strategies October 7, 2013 - 1:17pm Addthis YOU ARE HERE: Step 4 To help estimate costs of implementing greenhouse gas (GHG) mitigation strategies for vehicles, the table below provides the initial investment, operating costs, and operating savings for each strategy. Table 1. Types and Ranges of Initial Investment Requirements and Annual Operating Costs and Savings. Strategies Initial Investment Operating Costs Operating Savings Consolidate trips Time to research & coordinate routes None Eliminate fleet vehicle trips; reduce cost & time (fuel, maintenance, etc) associated with fleet vehicle use. Could result in decreasing inventory & need for vehicles leading to long-term savings

457

Reduce Operating Costs with an EnergySmart School Project | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

School Project Reduce Operating Costs with an EnergySmart School Project EnergySmart Schools fact sheet on how school operations and maintenance (O&M) personnel can play a...

458

Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Maintenance to Vehicle Maintenance to Conserve Fuel to someone by E-mail Share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Facebook Tweet about Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Twitter Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Google Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Delicious Rank Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Digg Find More places to share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on AddThis.com... More in this section... Idle Reduction Parts & Equipment Maintenance Driving Behavior Fleet Rightsizing System Efficiency Vehicle Maintenance to Conserve Fuel A comprehensive vehicle maintenance strategy can help fleet managers and

459

Facilities & Administrative (F&A) Costs at NIU F&A costs at NIU  

E-Print Network (OSTI)

project, instructional or public service activity. Such costs include utilities, buildings and facilities accrue only as projects dollars are expended. As a result, F&A costs are collected and allocatedFacilities & Administrative (F&A) Costs at NIU #12;F&A costs at NIU What are Facilities

Karonis, Nicholas T.

460

Levelized Cost of New Generation Resources in the Annual Energy ...  

U.S. Energy Information Administration (EIA)

costs, the levelized cost ... 4 These results do not include targeted tax credits such as the production or investment tax credit available for some technologies.

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Development and Implementation of a Condition Based Maintenance Program for Geothermal Power Plants  

DOE Green Energy (OSTI)

This report describes the development of the RCM team, identifying plant assets and developing an asset hierarchy, the development of sample Failure Mode Effects Analysis (FMEAs), identifying and prioritizing plant systems and components for RCM analysis, and identifying RCM/CBM software/hardware vendors. It also includes the Failure Mode Effects Analysis (FMEA) for all Class I Systems, Maintenance Task Assignments, use of Conditioned Based Maintenance (CBM) Tools and Displays of the RCM software System Development to date.

Steve Miller; Jim Eddy; Murray Grande; Shawn Bratt; Manuchehr Shirmohamadi

2002-01-30T23:59:59.000Z

462

Technological cost-reduction pathways for attenuator wave energy converters in the marine hydrokinetic environment.  

Science Conference Proceedings (OSTI)

This report considers and prioritizes the primary potential technical costreduction pathways for offshore wave activated body attenuators designed for ocean resources. This report focuses on technical research and development costreduction pathways related to the device technology rather than environmental monitoring or permitting opportunities. Three sources of information were used to understand current cost drivers and develop a prioritized list of potential costreduction pathways: a literature review of technical work related to attenuators, a reference device compiled from literature sources, and a webinar with each of three industry device developers. Data from these information sources were aggregated and prioritized with respect to the potential impact on the lifetime levelized cost of energy, the potential for progress, the potential for success, and the confidence in success. Results indicate the five most promising costreduction pathways include advanced controls, an optimized structural design, improved power conversion, planned maintenance scheduling, and an optimized device profile.

Bull, Diana L; Ochs, Margaret Ellen

2013-09-01T23:59:59.000Z

463

A survey of models and algorithms for winter road maintenance. Part I: system design for spreading and plowing  

Science Conference Proceedings (OSTI)

Winter road maintenance operations involve a host of decision-making problems at the strategic, tactical, operational, and real-time levels. Those operations include spreading of chemicals and abrasives, snow plowing, loading snow into trucks, and hauling ... Keywords: Operations research, Snow disposal, Snow hauling, Snow removal, Winter road maintenance

Nathalie Perrier; André Langevin; James F. Campbell

2006-01-01T23:59:59.000Z

464

Facilitating Decision Making and Maintenance for Power Systems Operators through the Use of Agents and Distributed Embedded Systems  

Science Conference Proceedings (OSTI)

This article examines the improvements provided when multimedia information in traditional SCADAS are included in electric facility management and maintenance. Telecontrol use in the electric sector, with the fundamental objective of providing increased ... Keywords: Embedded Systems, Maintenance, Multi-Agent Systems, SCADA, Surveillance, Telecontrol

A. Carrasco; M. C. Romero-Ternero; F. Sivianes; M. D. Hernández; D. I. Oviedo; J. Escudero

2010-10-01T23:59:59.000Z

465

Small Wind Guidebook/Where Can I Find Installation and Maintenance Support  

Open Energy Info (EERE)

Where Can I Find Installation and Maintenance Support Where Can I Find Installation and Maintenance Support < Small Wind Guidebook Jump to: navigation, search Print PDF WIND ENERGY STAKEHOLDER ENGAGEMENT & OUTREACHSmall Wind Guidebook Home WindTurbine-icon.png Small Wind Guidebook * Introduction * First, How Can I Make My Home More Energy Efficient? * Is Wind Energy Practical for Me? * What Size Wind Turbine Do I Need? * What Are the Basic Parts of a Small Wind Electric System? * What Do Wind Systems Cost? * Where Can I Find Installation and Maintenance Support? * How Much Energy Will My System Generate? * Is There Enough Wind on My Site? * How Do I Choose the Best Site for My Wind Turbine? * Can I Connect My System to the Utility Grid? * Can I Go Off-Grid? * State Information Portal * Glossary of Terms * For More Information

466

Safety assured financial evaluation of maintenance  

E-Print Network (OSTI)

Management decisions in complex industrial facilities usually consider both the economic and environmental aspects of the plant's performance. For nuclear power plants (NPPs), safety is also a very substantial issue. The objectives of this dissertation are to develop and demonstrate a novel useful conceptual model that could be used to allocate maintenance funds for a nuclear power plant in such a way as to meet all specified safety requirements and objectives, while achieving a high degree of economic performance. The model is based on the general theory that the reliability of a plant at any time is a function of its initial reliability and the maintenance history of the individual plant components (Smith, 1997). Such a model can assist in evaluating strategic management decisions regarding allocation of funds for nuclear power plant maintenance. It could be used as a simulation tool; various scenarios could be studied to answer "what if" questions. Simulations of this type will allow a better understanding of the relationship between maintenance, economic performance, and safety, and consequently will lead to better decision making. The novelty of this model is tied to the intimate relationship that it develops between maintenance activities at a nuclear plant, and their relationship to prescribed safety requirements and to the economic performance of that plant.

Erguina, Vera

2005-05-01T23:59:59.000Z

467

Reactor technology: power conversion systems and reactor operation and maintenance  

SciTech Connect

The use of advanced fuels permits the use of coolants (organic, high pressure helium) that result in power conversion systems with good thermal efficiency and relatively low cost. Water coolant would significantly reduce thermal efficiency, while lithium and salt coolants, which have been proposed for DT reactors, will have comparable power conversion efficiencies, but will probably be significantly more expensive. Helium cooled blankets with direct gas turbine power conversion cycles can also be used with DT reactors, but activation problems will be more severe, and the portion of blanket power in the metallic structure will probably not be available for the direct cycle, because of temperature limitations. A very important potential advantage of advanced fuel reactors over DT fusion reactors is the possibility of easier blanket maintenance and reduced down time for replacement. If unexpected leaks occur, in most cases the leaking circuit can be shut off and a redundant cooling curcuit will take over the thermal load. With the D-He/sup 3/ reactor, it appears practical to do this while the reactor is operating, as long as the leak is small enough not to shut down the reactor. Redundancy for Cat-D reactors has not been explored in detail, but appears feasible in principle. The idea of mobile units operating in the reactor chamber for service and maintenance of radioactive elements is explored.

Powell, J.R.

1977-01-01T23:59:59.000Z

468

Appendix F Cultural Resources, Including  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appendix F Appendix F Cultural Resources, Including Section 106 Consultation STATE OF CALIFORNIA - THE RESOURCES AGENCY EDMUND G. BROWN, JR., Governor OFFICE OF HISTORIC PRESERVATION DEPARTMENT OF PARKS AND RECREATION 1725 23 rd Street, Suite 100 SACRAMENTO, CA 95816-7100 (916) 445-7000 Fax: (916) 445-7053 calshpo@parks.ca.gov www.ohp.parks.ca.gov June 14, 2011 Reply in Reference To: DOE110407A Angela Colamaria Loan Programs Office Environmental Compliance Division Department of Energy 1000 Independence Ave SW, LP-10 Washington, DC 20585 Re: Topaz Solar Farm, San Luis Obispo County, California Dear Ms. Colamaria: Thank you for seeking my consultation regarding the above noted undertaking. Pursuant to 36 CFR Part 800 (as amended 8-05-04) regulations implementing Section

469

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

470

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

471

Eng. Opt., 2002, Vol. 34, pp. 561577 DESIGNING FOR MAINTENANCE  

E-Print Network (OSTI)

of a series of absorption chillers for an industrial complex. Keywords: Maintenance; Game theory; Decision

Seepersad, Carolyn Conner

472

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 O&M Ideas for Major Equipment Types 9 O&M Ideas for Major Equipment Types 9.1 Introduction At the heart of all O&M lies the equipment. Across the Federal sector, this equipment varies greatly in age, size, type, model, fuel used, condition, etc. While it is well beyond the scope of this guide to study all equipment types, we tried to focus our efforts on the more common types prevalent in the Federal sector. The objectives of this chapter are the following: * Present general equipment descriptions and operating principles for the major equipment types. * Discuss the key maintenance components of that equipment. * Highlight important safety issues. * Point out cost and energy efficiency issues. * Highlight any water-related efficiency impacts issues. * Provide recommended general O&M activities in the form of checklists.

473

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Introduction and Overview 1 Introduction and Overview The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective O&M as it applies to systems and equipment typically found at Federal facilities. This guide is not

474

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 1 Introduction and Overview The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective

475

Federal Energy Management Program: Operations and Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Support to someone by E-mail Management Support to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Management Support on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Management Support on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Google Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Delicious Rank Federal Energy Management Program: Operations and Maintenance Management Support on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Management Support on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

476

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Measurement to someone by E-mail Measurement to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Measurement on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Measurement on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Measurement on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Measurement on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

477

Countries Gasoline Prices Including Taxes  

Gasoline and Diesel Fuel Update (EIA)

Countries (U.S. dollars per gallon, including taxes) Countries (U.S. dollars per gallon, including taxes) Date Belgium France Germany Italy Netherlands UK US 01/13/14 7.83 7.76 7.90 8.91 8.76 8.11 3.68 01/06/14 8.00 7.78 7.94 8.92 8.74 8.09 3.69 12/30/13 NA NA NA NA NA NA 3.68 12/23/13 NA NA NA NA NA NA 3.63 12/16/13 7.86 7.79 8.05 9.00 8.78 8.08 3.61 12/9/13 7.95 7.81 8.14 8.99 8.80 8.12 3.63 12/2/13 7.91 7.68 8.07 8.85 8.68 8.08 3.64 11/25/13 7.69 7.61 8.07 8.77 8.63 7.97 3.65 11/18/13 7.99 7.54 8.00 8.70 8.57 7.92 3.57 11/11/13 7.63 7.44 7.79 8.63 8.46 7.85 3.55 11/4/13 7.70 7.51 7.98 8.70 8.59 7.86 3.61 10/28/13 8.02 7.74 8.08 8.96 8.79 8.04 3.64 10/21/13 7.91 7.71 8.11 8.94 8.80 8.05 3.70 10/14/13 7.88 7.62 8.05 8.87 8.74 7.97 3.69

478

Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994  

Science Conference Proceedings (OSTI)

The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL`s control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994.

Anderson, L.A. [comp.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

1995-03-01T23:59:59.000Z

479

POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POST-DEACTIVATION SURVEILLANCE AND POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING Post-Deactivation Surveillance and Maintenance Planning Dependence of End-Points Planning on S&M Planning Primary Surveillance Concerns Typical Deactivation S&M Plan Contents Example of a Post-Deactivation S&M Plan Dependence of End-Points Planning on S&M Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is

480

software maintenance in Distributed, EVOLVing Environments  

E-Print Network (OSTI)

Distributed applications in evolving environments are typically difficult to maintain. Currently, human intervention is needed to maintain the application and adapt it to its changed environment. We need to: deploy application software on the added devices (buses), replace application software on the changed devices (e.g. to support the new advertisement display), and remove application software when no longer useful (e.g. because it requires an advertisement display which is removed). When the distributed environment becomes too large, or changes too often, manual software maintenance is no longer a feasible option. Automation is required. This paper reports on our ongoing work on dEVOLVe, a new OSGi based middleware platform which will automate some software maintenance tasks in ’distributed evolving environments’. dEVOLVe will detect changes in the distributed environment and will adapt the application accordingly. This way, the user is free from software maintenance tasks caused by the environment evolution.

Bart Elen; Sam Michiels; Wouter Joosen; Pierre Verbaeten; Bart Elen; Sam Michiels; Wouter Joosen; Pierre Verbaeten

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance cost includes" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

How Much Does That Incinerator Cost?  

E-Print Network (OSTI)

Biosecurity on poultry farms includes proper disposal of dead carcasses. In many cases, that means using an incinerator. Calculating the cost of an incinerator means considering long and short-term expenses and the cost of fuel. This publication explains how to select the right size incinerator and calculate all associated costs</