Compressed Air System Maintenance Guide  

Science Conference Proceedings (OSTI)

The "Compressed Air System Maintenance Guide" provides fossil plant personnel with information on the operation and maintenance of the compressed air system. The contents of this guide will assist personnel in improving performance of the compressed air system, reducing maintenance costs, and increasing air system reliability.

2002-11-27T23:59:59.000Z

2

Nuclear Maintenance Applications Center: Condenser Air Removal Equipment Maintenance Guide  

Science Conference Proceedings (OSTI)

The Condenser Air Removal Equipment Maintenance Guide provides power plant maintenance personnel with current maintenance information on this system. This guide will assist the plant maintenance personnel in improving reliability and reducing maintenance costs for the condenser air removal (CAR) equipment.

2007-12-21T23:59:59.000Z

3

Air Force Renewable Energy Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Ken Gray P.E. HQ AFCESA /CENR Air Force Renewable Energy Programs April, 2011 FUPWG "Make Energy a Consideration in All We Do" I n t e g r i t y - S e r v i c e - E x c e l l e n c e THINK GREEN, BUILD GREEN, Topics  Air Force Energy Use  Air Force Facility Energy Center  Current RE Generation  Project Development System  Programmed RE Generation FY11-13  Goal Achievement 2 I n t e g r i t y - S e r v i c e - E x c e l l e n c e THINK GREEN, BUILD GREEN, Air Force 2010 Energy Use The Air Force spent approximately $8.2 billion for energy in 2010; an increase of 22% from 2009 Energy Cost and Consumption Trends Energy Cost Breakdown Aviation 79% Facilities 17% 3 Aviation 84% Facilities 12% Vehicles & Equipment

4

Forced air fireplace furnace  

Science Conference Proceedings (OSTI)

The design of heating system for buildings including a fireplace with an open front hearth for burning firewood, a chimney extending from the upper portion of the hearth, a metal firebox being open in the front and closed on the sides and back, a plenum chamber within and surrounding the sides and back of the metal firebox and the chimney lower portion, a horizontal heat distribution chamber positioned in the building attic and communicating at one end with the plenum chamber is described. An air distribution duct connects to the other end of the air distributing chamber, the duct extending to discharge heated air to a place in the building remote from the fireplace. A fan is placed in the horizontal air distributing chamber, and a return air duct extends from selected place in the building and communicates with the plenum chamber lower portion so that the fan draws air through the return air duct, through the plenum chamber around the firebox where the air is heated, through the horizontal distribution chamber, and out through the distribution duct for circulation of the heated air within the building.

Bruce, R.W.; Gorman, R.E.

1980-10-28T23:59:59.000Z

5

AIR FORCE SPECIAL WEAPONS CENTER  

Office of Legacy Management (LM)

HEADQUARTERS aII?y HEADQUARTERS aII?y 9 AIR FORCE SPECIAL WEAPONS CENTER 1 AIR FORCE SYSTEMS COMMAND . - KlRTlAND AIR FORCE BASE, NEW MEXICO - k FINAL REPORT O N AIR FORCE PARTICIPATION PROJECT RULISON .1 O c t o b e r 1969 P r e p a r e d by : CONT INENTAL TEST D I V I S ION DIRECTORATE OF NUCLEAR FIELD OPERATIONS This page intentionally left blank INDEX AIR FORCE PARTICIPATION I N PROJECT RULISON FINAL REPORT PARAGRAPH BASIC REPORT SUBJECT R e f e r e n c e s PAGE 2 G e n e r a l 1 3 P l a n n i n g 3 4 Command a n d C o n t r o l 5 O p e r a t i o n s , G r a n d ' J u n c t i o n M u n i c i p a l A i r p o r t . . ' A i r O p e r a t i o n s C e n t e r , He1 i c o p t e r P a d / ' 7.. - . M a t e r i e l : ' 8 M e d i c a l 1 9 R a d - S a f e C r a s h - R e s c u e S e c u r i t y 2 1 C o m m u n i c a t i o n s ~ d m i n i s t r a t ' i o n Summary ATTACHMENTS ATTACHMENT SUBJECI' 1 F r a g O r d e r 69-1 ( ~ r o j ' e c t RULISON) , AFSWC D

6

Case Study - Hill Air Force Base, Utah | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hill Air Force Base, Utah Hill Air Force Base, Utah Case Study - Hill Air Force Base, Utah October 7, 2013 - 2:00pm Addthis Overview Energy savings performance contracting at Hill Air Force Base generated much interest during a recent training session on energy management that downlinked 12 Department of Defense sites. Energy systems in 940 buildings on the Base will be upgraded under an 18-year ESPC between the Government and the energy service company, CES/Way. Improvements are distributed over five task orders that will be completed in five years, with CES/Way providing $2.5 million in up-front costs for the first two task orders. Utah Power & Light will provide $8 million in rebates to help cover the contractor's initial investment, maintenance services, and interest costs.

7

Air Force Enhanced Use Lease  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Air Force Enhanced Use Lease Mr. Brian Brown 16 Oct. 12 I n t e g r i t y - S e r v i c e - E x c e l l e n c e 2 Agenda  Brian Brown  Enhanced Use Lease (EUL) Overview  Energy EULs  EUL Goals  David Swanson  Energy EUL Market Drivers  Current EUL Projects  Partnering with the Air Force  Contact Information I n t e g r i t y - S e r v i c e - E x c e l l e n c e 3 Overview  Authority 10 USC 2667  An EUL is a lease  By the government  Of "non-excess" property  Under the control of the government  To a public or private sector lessee  In exchange for fair market value rental payments in cash and/or in kind consideration I n t e g r i t y - S e r v i c e - E x c e l l e n c e

8

Air Force Announces Funding for Alternative Energy Research ...  

Air Force Announces Funding for Alternative Energy Research & Development. December 16, 2013. The Air Force Research Laboratory (AFRL) has ...

9

U.S. Air Force Fact Sheet Air Force Reserve Officer Training Corps  

E-Print Network (OSTI)

merged under the newly created parent organization, HQ Air Force Officer and Accession Training School-to-day operations of either organization. In June 2008, HQ AFOATS was redesignated as the Jeanne M. Holm Center,796 new Second Lieutenants who entered active duty in the United States Air Force. Organization Air Force

Su, Xiao

10

Kirland Air Force Base wins Robot Rodeo  

NLE Websites -- All DOE Office Websites (Extended Search)

Kirland Air Force Base wins Robot Rodeo Kirland Air Force Base wins Robot Rodeo Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Kirland Air Force Base wins Robot Rodeo Hazardous devices teams test their maneuvering skills July 1, 2013 Students from Valarde Middle School won the video competition in the Best in Show and Middle School categories. They are shown here with sixth-grade teacher Jimmy Lara. During the Robot Rodeo, an unseen operator attempts to conduct reconnaissance and rescue injured personnel Contact Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Kirland Air Force Base wins Robot Rodeo Police and public safety teams from as far away as New Jersey recently convened in Albuquerque to test their ability to remotely deploy robots

11

Air Force Achieves Fuel Efficiency through Industry Best Practices...  

NLE Websites -- All DOE Office Websites (Extended Search)

ideas and implement initiatives with the Air Force Achieves Fuel Efficiency through Industry Best Practices The Air Force Energy Plan is built upon three pillars: reduce...

12

Clean Air Task Force CATF | Open Energy Information  

Open Energy Info (EERE)

Task Force CATF Jump to: navigation, search Name Clean Air Task Force (CATF) Place Boston, Massachusetts Zip 2108 Product Massachusetts-based scientific research and legal advocacy...

13

Ellsworth Air Force Base Advanced Metering Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ellsworth Air Force Base Ellsworth Air Force Base Advanced Metering Project A Partnership between Ellsworth AFB and MDU Resources Group, Inc. to install advanced metering on all large buildings on EAFB  Based in Bismarck, North Dakota  Celebrated our 85 th year in 2009  NYSE - MDU for over 60 years  Over $4B market cap  Fortune 500 Company  Member of the S&P MidCap 400 Index  Over 8,000 employees in 44 states  Business Lines:  Energy  Utility Resources  Construction Materials  Construction Materials  Energy  Oil and Gas Production  Utility Resources  Natural Gas Pipelines  Construction Services  Electric / Natural Gas Utilities  Utility Resources  Montana - Dakota Utilities Co.  Cascade Natural Gas Co.  Intermountain Gas Corporation

14

Forced Air Systems in High Performance Homes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FORCED AIR SYSTEMS IN FORCED AIR SYSTEMS IN HIGH PERFORMANCE HOMES Iain Walker (LBNL) Building America Meeting 2013 What are the issues? 1. Sizing  When is too small too small? 2. Distribution  Can we get good mixing at low flow? 3. Performance  Humidity Control  Part load efficiency  Blowers & thermal losses Sizing  Part-load - not an issue with modern equipment  Careful about predicted loads - a small error becomes a big problem for tightly sized systems  Too Low Capacity = not robust  Extreme vs. design days  Change in occupancy  Party mode  Recovery from setback Sizing  Conventional wisdom - a good envelope = easy to predict and not sensitive to indoor conditions  But..... Heating and cooling become discretionary - large variability depending on occupants

15

Chapter 51 Attainment and Maintenance of the National Ambient Air Quality Standards (Kentucky)  

Energy.gov (U.S. Department of Energy (DOE))

Kentucky Administrative Regulation Chapter 51, entitled Attainment and Maintenance of the National Ambient Air Quality Standards, is promulgated under the authority of the Division of Air Quality...

16

Maintenance Guidelines for Air Conveyors in Biomass Transport  

Science Conference Proceedings (OSTI)

Utilities are beginning to add wood and other biomass fuels to fire their generating units. This enables them to produce carbon-neutral electricity and participate in state or national renewable energy programs. New equipment is available to convey biomass. This equipment is analogous in function to existing conveyors, but it is different from the detail, design, maintenance, and operations perspectives. Air-supported belt conveyors have replaced the carry idlers that are common to conventional belt conv...

2012-06-20T23:59:59.000Z

17

Nuclear Maintenance Applications Center: Air-Operated Valve Maintenance Guide: Revision 2  

Science Conference Proceedings (OSTI)

An increased awareness of the importance of air-operated valves (AOVs) has led to progressively more sophisticated maintenance practices within the nuclear industry. Nonnuclear plants are also heavily dependent on reliable AOV operation. The dynamic method used by fossil power plants to satisfy transient electrical demands places additional stress on plant components, including AOVs. Therefore, there is a growing need for standardized technical guidance related to AOVs. The Electric Power Research Instit...

2008-12-18T23:59:59.000Z

18

US Air Force Facility Energy Management Program - How Industry Can Help the Air Force Meet Its Objectives  

E-Print Network (OSTI)

This paper describes the Air Force's facility energy management program including how industry can help the Air Force meet its facility energy objectives. Background information on energy use and energy conservation efforts are presented to give the reader an understanding of the magnitude of energy used by the Air Force and how greater efficiency of use is being approached.

Holden, P. C.; Kroop, R. H.

1983-01-01T23:59:59.000Z

19

Feature - Air Force Fellows helping work toward smarter diesel engines  

NLE Websites -- All DOE Office Websites (Extended Search)

Air Force Fellows helping work toward smarter diesel engines Air Force Fellows helping work toward smarter diesel engines Air Force Fellows Clint Abell (left) and Jeff Gillen work on Smarter Diesel Engine (SDE) 21. The project involves using ion sensors to help the engine run at maximum efficiency. Air Force Fellows Clint Abell (left) and Jeff Gillen work on Smarter Diesel Engine (SDE) 21. The project involves using ion sensors to help the engine run at maximum efficiency. (Photo by Wes Agresta) One of the three core values of the Air Force is "excellence in all we do." So it should be no surprise that there are currently two Air Force officers here at Argonne studying ways to improve the efficiency of military vehicles. Lieutenant Colonel Jeff Gillen and Major Clint Abell are the fourth set of Air Force Fellows to spend time at Argonne, but the first to be stationed

20

Optimal scheduling of fighter aircraft maintenance  

E-Print Network (OSTI)

The effective scheduling of fighter aircraft maintenance in the Air Force is crucial to overall mission accomplishment. An effective maintenance scheduling policy maximizes the use of maintenance resources and aircraft ...

Cho, Philip Y

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Renewable Hydrogen Production at Hickam Air Force Base  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen Production at Hickam Air Force Base November 2009 Hawaii Center for Advanced Transportation Technologies *&1; Established by the High Technology Development Corporation (a...

22

Proceedings from EPRI's Improve Overall Substations Maintenance (37B) & HVCB Life Management (37F) Task Force  

Science Conference Proceedings (OSTI)

EPRI's Improve Overall Substations Maintenance (37B) and High Voltage Circuit Breaker (HVCB) Life Management (37F) Task Force met December 5, 2007, in San Antonio, Texas. This technical update contains the proceedings of the meeting.

2008-02-04T23:59:59.000Z

23

Brig. Gen. Dawkins honored at Air Force promotion ceremony | National  

NLE Websites -- All DOE Office Websites (Extended Search)

Dawkins honored at Air Force promotion ceremony | National Dawkins honored at Air Force promotion ceremony | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Brig. Gen. Dawkins honored at Air Force ... Brig. Gen. Dawkins honored at Air Force promotion ceremony Posted By Office of Public Affairs Brig. Gen. Dawkins honored at Air Force promotion ceremony

24

Residential Forced Air System Cabinet Leakage and Blower Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Forced Air System Cabinet Leakage and Blower Performance Residential Forced Air System Cabinet Leakage and Blower Performance Title Residential Forced Air System Cabinet Leakage and Blower Performance Publication Type Report LBNL Report Number LBNL-3383E Year of Publication 2010 Authors Walker, Iain S., Darryl J. Dickerhoff, and William W. Delp Publisher Lawrence Berkeley National Laboratory City Berkeley Keywords air flow measurement, air leakage, blower power measurement, blowers, energy performance of buildings group, forced air systems, furnaces, indoor environment department, other, public interest energy research (pier) program, residential hvac Abstract This project evaluated the air leakage and electric power consumption of Residential HVAC components, with a particular focus on air leakage of furnace cabinets. Laboratory testing of HVAC components indicated that air leakage can be significant and highly variable from unit to unit - indicating the need for a standard test method and specifying maximum allowable air leakage in California State energy codes. To further this effort, this project provided technical assistance for the development of a national standard for Residential HVAC equipment air leakage. This standard is being developed by ASHRAE and is called "ASHRAE Standard 193P - Method of test for Determining the Air Leakage Rate of HVAC Equipment". The final part of this project evaluated techniques for measurement of furnace blower power consumption. A draft test procedure for power consumption was developed in collaboration with the Canadian General Standards Board: CSA 823 "Performance Standard for air handlers in residential space conditioning systems".

25

Portfolio management in the Air Force : current status and opportunities  

E-Print Network (OSTI)

There are hundreds of weapons programs, under the management of the United States Air Force worth billions of dollars. These programs are being developed to fulfill a need in the U.S. defense strategy. Bringing these weapon ...

Morgan, Dave B

2011-01-01T23:59:59.000Z

26

Developer Air Force Center for Engineering and the Environment...  

Open Energy Info (EERE)

en.openei.orgwikiSpecial:SearchByPropertyDeveloperAir-20Force-20Center-20for-20Engineering-20and-20the-20Environment" Special pages About us Disclaimers Energy blogs...

27

Air Force Adoption of ICME for Materials and Manufacturing R&D  

Science Conference Proceedings (OSTI)

Abstract Scope, Numerous challenges and opportunities face the Air Force with regard to materials and manufacturing R&D. An aging Air Force aircraft fleet,...

28

OEIM 210. Industrial Mechanics III 4 cr. Air compressors, sliding surface bearings, boiler maintenance, boiler  

E-Print Network (OSTI)

OEIM 210. Industrial Mechanics III 4 cr. Air compressors, sliding surface bearings, boiler maintenance, boiler tube repairs, basic arc and gas welding, measurement tools, gauge glass maintenance, heat by employer and instructor on boiler inspection and cleaning, centrifugal pumps, basic rigging, piping

Castillo, Steven P.

29

Demonstration of Security Benefits of Renewable Generation at FE Warren Air Force Base  

DOE Green Energy (OSTI)

Report detailing field demonstration of security benefits of renewable generation at FE Warren Air Force Base.

Warwick, William M.; Myers, Kurt; Seifert, Gary

2010-12-31T23:59:59.000Z

30

EHC Tubing/Fittings and Air Piping Applications and Maintenance Guide  

Science Conference Proceedings (OSTI)

The tubing and fittings of electrohydraulic controls (EHC) and the air piping in steam turbines have been a cause of plant trips, load reductions, and maintenance problems. This guide provides information and recommendations to improve the reliability of these components in the EHC and compressed air systems.

2000-11-16T23:59:59.000Z

31

Energy Efficiency Upgrades for Little Rock Air Force Base  

DOE Green Energy (OSTI)

Little Rock Air Force Base (LRAFB), in partnership with the local utility, Entergy Services, Inc., has reduced energy costs and used savings from investments in high-efficiency equipment to maintain and improve the condition of base housing and other facilities. Three projects were completed, with over $10 million invested. Major accomplishments include replacing air-to-air heat pumps with high-efficiency ground-source heat pumps (GSHPs) in more than 1,500 base housing units, lighting modifications to 10 buildings, upgrade of HVAC equipment in the base's enlisted club, and energy-efficient lighting retrofits for LRAFB's flight simulator.

Goldman, C.; Dunlap, M.A.

2000-11-13T23:59:59.000Z

32

Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement  

SciTech Connect

This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

Springer, D.; Dakin, B.

2013-03-01T23:59:59.000Z

33

Geothermal-resource verification for Air Force bases  

DOE Green Energy (OSTI)

This report summarizes the various types of geothermal energy reviews some legal uncertainties of the resource and then describes a methodology to evaluate geothermal resources for applications to US Air Force bases. Estimates suggest that exploration costs will be $50,000 to $300,000, which, if favorable, would lead to drilling a $500,000 exploration well. Successful identification and development of a geothermal resource could provide all base, fixed system needs with an inexpensive, renewable energy source.

Grant, P.R. Jr.

1981-06-01T23:59:59.000Z

34

Nuclear Maintenance Applications Center: Air-Operated Valve Diagnostic Testing Guide  

Science Conference Proceedings (OSTI)

This report provides information for personnel involved in the performance of air-operated valve (AOV) diagnostic testing, including the benefits of using diagnostics to understand valve health and to tie information into preventive maintenance programs. It provides insights for experienced personnel as well as basic information, guidance, and instructions for personnel assigned to perform, analyze, or purchase diagnostic test equipment.

2011-12-23T23:59:59.000Z

35

TransForum v9n2 - Air Force Fellows and Smarter Diesel Engines  

NLE Websites -- All DOE Office Websites (Extended Search)

Air Force Fellows Help Work Toward Smarter Diesel Engines Air force fellows Major Clint Abell (center), Steve McConnell, Lt. Col. Jeff Gillen, Thomas Wallner and Steve Ciatti (in...

36

Maintenance  

Science Conference Proceedings (OSTI)

Higher oil and labour costs, plus low quality fuel, demand that management takes a closer look at diesel engine lubrication. Problems of corrosion due to sulphur containing acids, oil analysis in order that it can be changed when necessary, filter analysis, use of multi-viscosity oil, and storage of oils are considered. A comprehensive lubricant conservation programme can reduce maintenance, labour costs and equipment downtime. Cleaning and replacement of bearings are discussed. Managing tire costs is also described.

Not Available

1981-06-01T23:59:59.000Z

37

Federal Energy Management Program: Case Study - Hill Air Force Base, Utah  

NLE Websites -- All DOE Office Websites (Extended Search)

Case Study - Hill Case Study - Hill Air Force Base, Utah to someone by E-mail Share Federal Energy Management Program: Case Study - Hill Air Force Base, Utah on Facebook Tweet about Federal Energy Management Program: Case Study - Hill Air Force Base, Utah on Twitter Bookmark Federal Energy Management Program: Case Study - Hill Air Force Base, Utah on Google Bookmark Federal Energy Management Program: Case Study - Hill Air Force Base, Utah on Delicious Rank Federal Energy Management Program: Case Study - Hill Air Force Base, Utah on Digg Find More places to share Federal Energy Management Program: Case Study - Hill Air Force Base, Utah on AddThis.com... Energy Savings Performance Contracts Assistance & Contacts Resources Laws & Regulations Energy Service Companies Awarded Projects

38

Nuclear Maintenance Applications Center: Heating, Ventilating, and Air Conditioning Specialist Guide  

Science Conference Proceedings (OSTI)

The people responsible for heating, ventilating, and air conditioning (HVAC) in the nuclear power industry are known by various titles--HVAC specialist, HVAC component engineer, HVAC system manager, and HVAC system engineer, to name a few. Although HVAC duties and responsibilities are often spread across several departments, such as maintenance, operations, engineering, and procurement, it is up to the HVAC specialist to ensure that HVAC system and component health and reliability are maintained. This re...

2011-11-28T23:59:59.000Z

39

Air Force Achieves Fuel Efficiency through Industry Best Practices (Brochure), Federal Energy Management Program (FEMP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

highest potential to save aviation fuel. highest potential to save aviation fuel. All MAF personnel are encouraged to propose fuel savings ideas. These ideas are then processed as initiatives, assigned a primary point of contact, and routed through an analysis process to prepare the initiative for presenta- tion to the Air Force's corporate structure. The corporate structure then evaluates and determines the initiatives with the highest potential fuel savings. Fuel-saving efforts focus on six major areas: policy, planning, execution, maintenance, science and technology, and fuel-efficient aircraft systems. The MAF also established a predetermined set of fuel-savings metrics and required reporting. In fiscal year 2011, implemented fuel initiatives saved the MAF more than 42 million gallons of aviation fuel in both

40

Robins Air Force Base integrated resource assessment. Volume 3, Resource assessment  

SciTech Connect

The US Air Force Materiel Command (AFMC) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Robins Air Force Base (AFB). This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the AFMC Robins AFB facility located approximately 15 miles south of Macon, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 13 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative-description of each ERO is provided, including information on the installed cost, energy and dollar savings; impacts on operation and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

1993-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Operable Unit 1 remedial investigation report, Eielson Air Force Base, Alaska  

Science Conference Proceedings (OSTI)

This remedial investigation report for operable Unit 1 (OU-1) at Eielson Air Force Base presents data, calculations, and conclusions as to the nature and extent of surface and subsurface contamination at the eight source areas that make up OU-1. The information is based on the 1993 field investigation result and previous investigations. This report is the first in a set of three for OU-1. The other reports are the baseline risk assessment and feasibility study. The information in these reports will lead to a Record of Decision that will guide and conclude the environmental restoration effort for OU-1 at Eielson Air Force Base. The primary contaminants of concern include fuels and fuel-related contaminants (diesel; benzene, toluene, ethylbenzene, and xylene; total petroleum hydrocarbon; polycyclic aromatic hydrocarbons), maintenance-related solvents and cleaners (volatile chlorinated hydrocarbons such as trichloroothylene), polychlorinated biphenyls, and dichlorodiphenyltrichloroethane (DDT). The origins of contaminants of concern include leaks from storage tanks, drums and piping, and spills. Ongoing operations and past sitewide practices also contribute to contaminants of concern at OU-1 source areas. These include spraying mixed oil and solvent wastes on unpaved roads and aerial spraying of DDT.

Gilmore, T.J.; Fruland, R.M.; Liikala, T.L. [and others

1994-06-01T23:59:59.000Z

42

Energy-conservation study for the US Air Force Academy  

SciTech Connect

The United States Air Force Academy (AFA) has asked the Los Alamos National Laboratory to assist them in conducting detailed energy and solar analyses of selected AFA buildings using the DOE-2 building energy analysis computer program. The results of the energy conservation study conducted by Los Alamos in FY 1981 and 1982 for Building 2360 (Vandenberg Hall), Building 2169 (Field House), and Building 2410 (Aeronautics Laboratory) are presented. Energy Conservation and Solar Opportunities (ECOs) are identified for each building and predicted heating, cooling and electric energy savings are presented for each ECO. Economic results are summarized as annual dollars saved, discounted benefit-to-cost ratio, maximum investment targets, and the life-cycle cost of implementing each ECO.

Peterson, J.L.; Davis, L.B.

1983-01-01T23:59:59.000Z

43

Trends and Market Forces Shaping Small Community Air Service in the United States  

E-Print Network (OSTI)

This report, Trends and Market Forces Shaping Small Community Air Service in the United States, is the first in a series of papers written under the umbrella of the MIT Small Community Air Service White Paper series. The ...

Wittman, Michael D.

2013-05-07T23:59:59.000Z

44

Griffiss Air Force Base integrated resource assessment. Volume 3, Electric resource assessment  

Science Conference Proceedings (OSTI)

The US Air Force Air Combat Command (ACC) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP) to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). FEMP, with support from the Pacific Northwest Laboratory (PNL), is designing this model program for federal customers served by the Niagara Mohawk Power Company. The program with Griffiss AFB will (1) identify and evaluate all cost-effective electric energy projects; (2) develop a schedule for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have them procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk`s primary federal facilities, the ACC Griffiss AFB facility located near Rome, New York. The results of the analyses of EROs are presented in seven common energy end-use categories. A narrative description of each ERO provides information on the initial cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. The evaluation methodology and technical and cost assumptions are also described for each ERO. Summary tables present the operational performance of energy end-use equipment before and after the implementation of each ERO and the results of the life-cycle cost analysis indicating the net present value (NPV) and savings-to-investment ratio (SIR) of each ERO.

Armstrong, P.R.; Shankle, S.A.; Elliott, D.B.; Stucky, D.J.; Keller, J.M.; Wahlstrom, R.R.; Dagle, J.E.; Gu, A.Y.

1993-09-01T23:59:59.000Z

45

Nellis Air Force Base solar array provides model for renewable projects |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nellis Air Force Base solar array provides model for renewable Nellis Air Force Base solar array provides model for renewable projects Nellis Air Force Base solar array provides model for renewable projects March 24, 2010 - 4:58pm Addthis The solar array at Nellis Air Force Base in Nevada consists of 70,000 panels. | Photo by Larry E. Reid Jr./U.S. Air Force The solar array at Nellis Air Force Base in Nevada consists of 70,000 panels. | Photo by Larry E. Reid Jr./U.S. Air Force A public-private partnership has helped one Air Force base reduce its energy costs and convert to 25 percent renewable energy. Nellis Air Force Base, just north of Las Vegas, took a big step in 2007 when it installed a 14.2-megawatt, 70,000-panel photovoltaic solar array that reduced carbon dioxide emissions by 24,000 tons a year. Built partly on a landfill, the

46

Residential Forced Air System Cabinet Leakage and Blower Performance  

E-Print Network (OSTI)

easyairsealing .suchthattheefficacyofairsealingis determinedbytheinlet that prevents easy air sealing DeltaQ TheDeltaQtest

Walker, Iain S.

2010-01-01T23:59:59.000Z

47

Residential Forced Air System Cabinet Leakage and Blower Performance  

E-Print Network (OSTI)

ResidentialACMManual,Section 3.12.5Duct/AirHandlerResidentialACMManual,Section3.12.5Duct/Air HandlerleakageofairhandlersforthepurposesoftheACM. Based

Walker, Iain S.

2010-01-01T23:59:59.000Z

48

Residential Forced Air System Cabinet Leakage and Blower Performance  

E-Print Network (OSTI)

CA. CEC(2008b). ResidentialAlternativeCalculationStandardforAirHandlersinResidentialSpaceConditioningofStandardsOptionsforResidentialAirHandlerFans.

Walker, Iain S.

2010-01-01T23:59:59.000Z

49

Future Direction of Supersonic Combustion Research: Air Force/NASA Workshop on Supersonic Combustion  

Science Conference Proceedings (OSTI)

The Air Force Office of Scientific Research, the Air Force Wright Laboratory Aero Propulsion and Power Directorate, and the NASA Langley Research Center held a joint supersonic combustion workshop on 14-16 May 1996. The intent of this meeting was to: ...

Tishkoff Julian M.; Drummond J. Philip; Edwards T.; Nejad A. S.

1997-01-01T23:59:59.000Z

50

Vandenberg Air Force Base integrated resource assessment. Volume 3, Resource assessment  

SciTech Connect

The US Air Force Space Command (SPACECOM) has tasked the Pacific Northwest Laboratory (PNL), as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program (FEMP), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Vandenberg Air Force Base (VAFB). This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the SPACECOM VAFB facility located approximately 50 miles northwest of Santa Barbara, California. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analysis of EROs are presented in ten common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). In addition, a case study of process loads at Space Launch Complex-4 (SLC-4) is included. A narrative description of each ERO is provided, including information on the installed cost, energy and dollar savings; impacts on operation and maintenance (O and M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and value index (VI) of each ERO. Finally, an appendix includes a summary of an economic analysis case study of the South Vandenberg Power Plant (SVPP) operating scenarios.

Daellenbach, K.K.; Dagle, J.E.; Dittmer, A.L.; Elliott, D.B.; Halverson, M.A.; Hickman, B.J.; Parker, G.B.; Richman, E.E.; Shankle, S.A.

1993-06-01T23:59:59.000Z

51

Cape Canaveral Air Force Station integrated resource assessment. Volume 3, Resource assessment  

Science Conference Proceedings (OSTI)

The U.S. Air Force (USAF) has tasked the Pacific Northwest Laboratory (PNL) in support of the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Cape Canaveral Air Force Station (AFS). Projects considered can be either in the form of energy management or energy conservation. The overall efforts of this task are based on a model program PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at Cape Canaveral AFS, which is located approximately 10 miles north of Cocoa Beach, Florida. It is a companion report to Volume 1: Executive Summary and Volume 2: Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, including information on the installed cost, energy and dollar savings, impacts on operations and maintenance (O&M), and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. Descriptions of the evaluation methodologies and technical and cost assumptions are also provided for each ERO. Summary tables present the cost- effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis, indicating the net present value (NPV) and savings-to-investment ratio (SIR) of each ERO.

Sandusky, W.F.; Eichman, C.J.; King, D.A.; McMordie, K.L.; Parker, S.A.; Shankle, S.A.; Wahlstrom, R.R.

1994-03-01T23:59:59.000Z

52

Installation-Restoration Program Stage 3. McClellan Air Force Base quality-assurance project plan. Final report, November 1987-August 1989  

Science Conference Proceedings (OSTI)

The USAF is conducting a Remedial Investigation/Feasibility Study ( RI/FS) at McClellan Air Force Base (AFB)to assess the extent and magnitude of contamination from past waste-disposal and spill sites. This process includes the development of a remediation plan(s) for sites determined to pose a threat to human health or welfare, or the environment. The remedial investigation (RI) phase of the program includes multimedia sampling tasks to complete site-characterization studies, and to assess potential exposure pathways. McClellan AFB is located near Sacramento, California and is an active aircraft maintenance facility associated with the Air Force Logistics Air Command. This document contains procedures for the collection, analysis, and documentation for all anticipated sampling and analysis tasks. These include ground water monitoring-well installation, geophysical techniques, and sampling and analysis for ground water, surface water, sediment, soil, soil vapor, and air.

Not Available

1989-08-30T23:59:59.000Z

53

Residential Forced Air System Cabinet Leakage and Blower Performance  

SciTech Connect

This project evaluated the air leakage and electric power consumption of Residential HVAC components, with a particular focus on air leakage of furnace cabinets. Laboratory testing of HVAC components indicated that air leakage can be significant and highly variable from unit to unit ? indicating the need for a standard test method and specifying maximum allowable air leakage in California State energy codes. To further this effort, this project provided technical assistance for the development of a national standard for Residential HVAC equipment air leakage. This standard is being developed by ASHRAE and is called"ASHRAE Standard 193P - Method of test for Determining the Air Leakage Rate of HVAC Equipment". The final part of this project evaluated techniques for measurement of furnace blower power consumption. A draft test procedure for power consumption was developed in collaboration with the Canadian General Standards Board: CSA 823"Performance Standard for air handlers in residential space conditioning systems".

Walker, Iain S.; Dickerhoff, Darryl J.; Delp, William W.

2010-03-01T23:59:59.000Z

54

F.E. Warren Air Force Base Wind Farm | Open Energy Information  

Open Energy Info (EERE)

F.E. Warren Air Force Base Wind Farm F.E. Warren Air Force Base Wind Farm Jump to: navigation, search Name F.E. Warren Air Force Base Wind Farm Facility F.E. Warren Air Force Base Sector Wind energy Facility Type Community Wind Facility Status In Service Owner F.E. Warren Air Force Base Developer F.E. Warren Air Force Base Energy Purchaser F.E. Warren Air Force Base Location Near Cheyenne WY Coordinates 41.175569°, -104.880778° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.175569,"lon":-104.880778,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

55

An analysis of retention issues of scientists, engineers, and program managers in the US Air Force  

E-Print Network (OSTI)

The United States Air Force is having a difficult time retaining their technical officers, who are critical to the success of their research, development, and acquisitions of major military and defense systems. A statistical ...

Beck, Derek William, 1977-

2005-01-01T23:59:59.000Z

56

Complexity within the Air Force acquisition system gaining insight from a theory of collapse  

E-Print Network (OSTI)

Joseph Tainter's theory of societal collapse is applied in an examination of the U.S. Air Force's aircraft acquisition system in order to gain insight into the enterprise's lagging performance. Theories of collapse at both ...

Marticello, Daniel Nicholas, Jr

2012-01-01T23:59:59.000Z

57

Influence of Forced Large-Scale Atmospheric Patterns on Surface Air Temperature in China  

Science Conference Proceedings (OSTI)

The seasonality of the influence of the tropical Pacific sea surface temperature (SST)-forced large-scale atmospheric patterns on the surface air temperature (SAT) over China is investigated for the period from 1969 to 2001. Both observations and ...

Xiaojing Jia; Hai Lin

2011-03-01T23:59:59.000Z

58

Register Closing Effects on Forced Air Heating System Performance  

E-Print Network (OSTI)

Air Handler Power - Climate Zone 16 48 hr avg 24 hr avg FarAverage Gas Power - Climate Zone 16 48 hr avg 24 hr avg NearAverage Gas Power - Climate Zone 16 48 hr avg Near Registers

Walker, Iain S.

2003-01-01T23:59:59.000Z

59

Blue Horizons Study Assesses Future Capabilities and Technologies for the United States Air Force  

Science Conference Proceedings (OSTI)

The purpose of the Blue Horizons study was to determine the capabilities and technologies in which the United States Air Force would need to invest to maintain dominant air, space, and cyberspace capabilities in the year 2030. The study used two methodologies, ... Keywords: decision analysis, defense, multiple criteria, research and development, scenarios, technology, uncertainty

John P. Geis; Gregory S. Parnell; Harry Newton; Terry Bresnick

2011-07-01T23:59:59.000Z

60

Sensitivity of forced air distribution system efficiency to climate, duct location, air leakage and insulation  

E-Print Network (OSTI)

Location, Air Leakage and Insulation Iain S. Walker Energy4 Duct Insulation, Location and Leakageinsulation

Walker, Iain

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Analysis of 1994 Air Force toxic release inventory reporting. Master`s thesis  

Science Conference Proceedings (OSTI)

The purpose of this research is to analyze the Air Force`s 1994 Toxic Release Inventory data. Statistical tests were used to meet the following research objectives: (1) review the CY 94 data to determine which chemicals were most often reported and which bases and major commands had the most releases in terms of the number of chemicals reported and the amount of chemicals reported and (2) investigate factors which could influence the reporting status of a facility. An analysis of a survey of Air Force facilities indicated that two factors had an influence on the reporting status of Air Force facilities: (1) whether the TRI point of contact had confidence in the completeness of the data used for threshold computations and (2) whether the primary database used for threshold computations was the Standard Base Supply System.

Pollock, B.A.

1995-12-01T23:59:59.000Z

62

Air Force Academy, Colorado: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Force Academy, Colorado: Energy Resources Force Academy, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 38.990448°, -104.860139° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.990448,"lon":-104.860139,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

63

Militainment and mechatronics: Occultatio and the veil of science fiction cool in United States Air Force advertisements  

Science Conference Proceedings (OSTI)

In 2009, the United States Air Force aired a series of science fiction-themed recruitment commercials on network television and their official YouTube channel. In these advertisements, the superimposition of science fiction imagery over depictions of ... Keywords: Militainment, Rhetoric, Robots, Science fiction, United States Air Force, Video games

Nicholas R. Maradin, Iii

2013-06-01T23:59:59.000Z

64

The Impact of Forced Air System Blowers on Furnace Performance and Utility  

NLE Websites -- All DOE Office Websites (Extended Search)

The Impact of Forced Air System Blowers on Furnace Performance and Utility The Impact of Forced Air System Blowers on Furnace Performance and Utility Loads Speaker(s): Bert Phillips Date: November 7, 2003 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: James Lutz Bert Phillips will talk about the impact of forced air system blower performance on furnace or heating performance and on utility loads, and what can be done to reduce blower power requirements. He will also briefly discuss a ground source heat pump monitoring study that he just finished. Mr. Phillips is a registered Professional Engineer in three Canadian provinces and part owner of UNIES Ltd., an engineering firm in Winnipeg, Manitoba (60 miles straight north of the North Dakota/Minnesota border). He does research and HVAC system design and investigates

65

DOE - Office of Legacy Management -- Air Force Plant No 36 - OH 06  

NLE Websites -- All DOE Office Websites (Extended Search)

Air Force Plant No 36 - OH 06 Air Force Plant No 36 - OH 06 FUSRAP Considered Sites Site: AIR FORCE PLANT NO. 36 (OH.06 ) Eliminated from consideration under FUSRAP - Site referred to DOD Designated Name: Not Designated Alternate Name: General Electric Plant G.E. Evandale Plant G.E. Cincinnati Plant OH.06-1 Location: Lockland , Ohio OH.06-1 Evaluation Year: 1987 OH.06-1 Site Operations: Performed work under AEC license involving radioactive material between 1961 and 1970. OH.06-2 Site Disposition: Eliminated - Referred to DOD OH.06-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium and Thorium OH.06-4 Radiological Survey(s): Yes, environmental sampling (as a minimum) OH.06-4 Site Status: Eliminated from consideration under FUSRAP - Site referred to DOD OH.06-3

66

Statistical characterization of the forces on spheres in an upflow of air  

E-Print Network (OSTI)

The dynamics of a sphere fluidized in a nearly-levitating upflow of air were previously found to be identical to those of a Brownian particle in a two-dimensional harmonic trap, consistent with a Langevin equation [Ojha {\\it et al.}, Nature {\\bf 427}, 521 (2004)]. The random forcing, the drag, and the trapping potential represent different aspects of the interaction of the sphere with the air flow. In this paper we vary the experimental conditions for a single sphere, and report on how the force terms in the Langevin equation scale with air flow speed, sphere radius, sphere density, and system size. We also report on the effective interaction potential between two spheres in an upflow of air.

R. P. Ojha; A. R. Abate; D. J. Durian

2004-06-30T23:59:59.000Z

67

Ameresco and Hill Air Force Base: SPP Success Story | ENERGY STAR Buildings  

NLE Websites -- All DOE Office Websites (Extended Search)

Hill Air Force Base: SPP Success Story Hill Air Force Base: SPP Success Story Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories

68

Characterization of Tritiated Hydrocarbon Species and Measurement of Their Concentrations in Air During Vacuum Pump Maintenance  

Science Conference Proceedings (OSTI)

Design, Operation, and Maintenance of Tritium System / Proceedings of the Fifth Topical Meeting on Tritium Technology In Fission, Fusion, and Isotopic Applications Belgirate, Italy May 28-June 3, 1995

J.P. Krasznai; S. Smith; R.E. Massey; L. Rodrigo; P. Agg; J.M. Miller

69

Tracking Hurricane Claudette with the U.S. Air Force Over-the-Horizon Radar  

Science Conference Proceedings (OSTI)

Hurricane Claudette was successfully tracked for three days using the 2-s (7 m) surface wave direction field mapped by the U.S. Air Force OTH-B over-the-horizon radar 2400 km away on the coast of Maine. Inflow and fine structure of the surface ...

T. M. Georges; J. A. Harlan; L. R. Meyer; R. G. Peer

1993-08-01T23:59:59.000Z

70

A Description of the Air Force Real-Time Nephanalysis Model  

Science Conference Proceedings (OSTI)

The Air Force Global Weather Central (AFGWC) Real-Time Nephanalysis (RTNEPH) is an automated cloud model that produces a 48-km gridded analysis of cloud amount, cloud type, and cloud height. Its primary input is imagery from polar-orbiting ...

Thomas M. Hamill; Robert P. D'Entremont; James T. Buntin

1992-06-01T23:59:59.000Z

71

Presentation to the Atomic Energy Commission and the Air Force, June 14, 1962  

SciTech Connect

This volume contains the charts and backup material presented to the Atomic Energy Commission and Air Force on June 14, 1962 concerning General Electric's Nuclear Materials and Propulsion Operation (formerly the Aircraft Nuclear Propulsion Department), during its work on the development of a nuclear power plant for manned aircraft.

1962-10-01T23:59:59.000Z

72

Economic analysis of coal-fired cogeneration plants for Air Force bases  

SciTech Connect

The Defense Appropriations Act of 1986 requires the Department of Defense to use an additional 1,600,000 tons/year of coal at their US facilities by 1995 and also states that the most economical fuel should be used at each facility. In a previous study of Air Force heating plants burning gas or oil, Oak Ridge National Laboratory found that only a small fraction of this target 1,600,000 tons/year could be achieved by converting the plants where coal is economically viable. To identify projects that would use greater amounts of coal, the economic benefits of installing coal-fired cogeneration plants at 7 candidate Air Force bases were examined in this study. A life-cycle cost analysis was performed that included two types of financing (Air Force and private) and three levels of energy escalation for a total of six economic scenarios. Hill, McGuire, and Plattsburgh Air Force Bases were identified as the facilities with the best potential for coal-fired cogeneration, but the actual cost savings will depend strongly on how the projects are financed and to a lesser extent on future energy escalation rates. 10 refs., 11 figs., 27 tabs.

Holcomb, R.S.; Griffin, F.P.

1990-10-01T23:59:59.000Z

73

Mountain Home Air Force Base, Idaho Geothermal Resource Assessment and Future Recommendations  

SciTech Connect

The U.S. Air Force is facing a number of challenges as it moves into the future, one of the biggest being how to provide safe and secure energy to support base operations. A team of scientists and engineers met at Mountain Home Air Force Base in early 2011 near Boise, Idaho, to discuss the possibility of exploring for geothermal resources under the base. The team identified that there was a reasonable potential for geothermal resources based on data from an existing well. In addition, a regional gravity map helped identify several possible locations for drilling a new well. The team identified several possible sources of funding for this wellthe most logical being to use U.S. Department of Energy funds to drill the upper half of the well and U.S. Air Force funds to drill the bottom half of the well. The well was designed as a slimhole well in accordance with State of Idaho Department of Water Resources rules and regulations. Drilling operations commenced at the Mountain Home site in July of 2011 and were completed in January of 2012. Temperatures increased gradually, especially below a depth of 2000 ft. Temperatures increased more rapidly below a depth of 5500 ft. The bottom of the well is at 5976 ft, where a temperature of about 140C was recorded. The well flowed artesian from a depth below 5600 ft, until it was plugged off with drilling mud. Core samples were collected from the well and are being analyzed to help understand permeability at depth. Additional tests using a televiewer system will be run to evaluate orientation and directions at fractures, especially in the production zone. A final report on the well exploitation will be forthcoming later this year. The Air Force will use it to evaluate the geothermal resource potential for future private development options at Mountain Home Air Force Base. In conclusion, Recommendation for follow-up efforts include the following:

Joseph C. Armstrong; Robert P. Breckenridge; Dennis L. Nielson; John W. Shervais; Thomas R. Wood

2013-03-01T23:59:59.000Z

74

DENSIFIED REFUSE DERIVED FUEL CO-FIRING EXPERIENCE IN U.S. AIR FORCE SPREADER STOKER BOILERS  

E-Print Network (OSTI)

DENSIFIED REFUSE DERIVED FUEL CO-FIRING EXPERIENCE IN U.S. AIR FORCE SPREADER STOKER BOILERS ALFRED and Services Center Tyndall AFB, Florida ABSTRACT The thermal and environmental performance of co firing 1982, the U.S. Air Force co-fired densified refuse-derived-fuel (dRDF) with coal in two types

Columbia University

75

The determinants of the governance of air conditioning maintenance in Australian retail centres.  

E-Print Network (OSTI)

??Retail centres are a visible sign of developed capitalist societies and make an appreciable contribution to these economies. For the firms involved in supplying air (more)

Bridge, Adrian J.

2008-01-01T23:59:59.000Z

76

(Environmental investigation of ground water contamination at Wright- Patterson Air Force Base, Ohio)  

SciTech Connect

This Health and Safety Plan (HSP) was developed for the Environmental Investigation of Ground-water Contamination Investigation at Wright-Patterson Air Force Base near Dayton, Ohio, based on the projected scope of work for the Phase 1, Task 4 Field Investigation. The HSP describes hazards that may be encountered during the investigation, assesses the hazards, and indicates what type of personal protective equipment is to be used for each task performed. The HSP also addresses the medical monitoring program, decontamination procedures, air monitoring, training, site control, accident prevention, and emergency response.

Not Available

1991-10-01T23:59:59.000Z

77

Distribution System Audits, Leak Detection, and Repair: Kirtland Air Force Base Leak Detection and Repair Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Best Management Practice Best Management Practice Case Study #3 Distribution System Audits, Leak Detection, and Repair Kirtland Air Force Base - Leak Detection and Repair Program Overview Kirtland Air Force Base (AFB) performed an award winning leak detection and repair program in 2006. The results of the project are saving Kirtland AFB 179 million gallons each year, which is over 16% of the total water use at the base. Kirtland AFB is located on 52,000 acres, southeast and adjacent to Albuquerque, New Mexico. The area is a high altitude desert, only receiving about 8 inches of rain each year. Kirtland AFB draws water from an under- ground aquifer via seven production wells through- out the base. The base also has access to water from the City of Albuquerque. The underground water

78

Distribution System Audits, Leak Detection, and Repair: Kirtland Air Force Base Leak Detection and Repair Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Best Management Practice Best Management Practice Case Study #3 Distribution System Audits, Leak Detection, and Repair Kirtland Air Force Base - Leak Detection and Repair Program Overview Kirtland Air Force Base (AFB) performed an award winning leak detection and repair program in 2006. The results of the project are saving Kirtland AFB 179 million gallons each year, which is over 16% of the total water use at the base. Kirtland AFB is located on 52,000 acres, southeast and adjacent to Albuquerque, New Mexico. The area is a high altitude desert, only receiving about 8 inches of rain each year. Kirtland AFB draws water from an under- ground aquifer via seven production wells through- out the base. The base also has access to water from the City of Albuquerque. The underground water

79

Aiding Air Force budget analysis with expert system tools and techniques  

SciTech Connect

A system to capture US Air Force financial expertise is currently under development. To accomplish its mission of costing Air Force programs, the Director of the Budget utilizes the services of budget analysts. Analysts are required to prepare three cost exercises during the year: the Program Objective Memorandum (POM), the Budget Estimation Submission (BES), and the President's Budget (PB). Additionally, during budget calls and budget execution, analysts must make decisions regarding funding obligations and outlays. Analysis and modification of outlay projection plans require the use of operational and procedural heuristics. These problem-solving steps followed by analysts are being used to develop a prototype. Information regarding the prototype, the tool, and its capabilities are presented. Additional features of the program are described including integration with existing information management systems.

Hardee, H.K.; Jones, K.A.; Morris, J.D.; Emrich, M.L.; Ali, H.

1987-09-14T23:59:59.000Z

80

Exploration and Resource Assessment at Mountain Home Air Force Base, Idaho Using an Integrated Team Approach  

Science Conference Proceedings (OSTI)

The U.S. Air Force is facing a number of challenges as it moves into the future, one of the biggest being how to provide safe and secure energy to support base operations. A team of scientists and engineers met at Mountain Home Air Force Base near Boise, Idaho, to discuss the possibility of exploring for geothermal resources under the base. The team identified that there was a reasonable potential for geothermal resources based on data from an existing well. In addition, a regional gravity map helped identify several possible locations for drilling a new well. The team identified several possible sources of funding for this wellthe most logical being to use U.S. Department of Energy funds to drill the upper half of the well and U.S. Air Force funds to drill the bottom half of the well. The well was designed as a slimhole well in accordance with State of Idaho Department of Water Resources rules and regulations. Drilling operations commenced at the Mountain Home site in July of 2011 and were completed in January of 2012. Temperatures increased gradually, especially below a depth of 2000 ft. Temperatures increased more rapidly below a depth of 5500 ft. The bottom of the well is at 5976 ft, where a temperature of about 140C was recorded. The well flowed artesian from a depth below 5600 ft, until it was plugged off with drilling mud. Core samples were collected from the well and are being analyzed to help understand permeability at depth. Additional tests using a televiewer system will be run to evaluate orientation and directions at fractures, especially in the production zone. A final report on the well exploitation will be forthcoming later this year. The Air Force will use it to evaluate the geothermal resource potential for future private development options at Mountain Home AFB.

Joseph C. Armstrong; Robert P. Breckenridge; Dennis L. Nielson; John W. Shervais; Thomas R. Wood

2012-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Geothermal exploration program, Hill Air Force Base, Davis and Weber Counties, Utah  

DOE Green Energy (OSTI)

Results obtained from a program designed to locate a low- or moderate-temperature geothermal resource that might exist beneath Hill Air Force Base (AFB), Ogden, Utah are discussed. A phased exploration program was conducted at Hill AFB. Published geological, geochemical, and geophysical reports on the area were examined, regional exploration was conducted, and two thermal gradient holes were drilled. This program demonstrated that thermal waters are not present in the shallow subsurface at this site. (MHR)

Glenn, W.E.; Chapman, D.S.; Foley, D.; Capuano, R.M.; Cole, D.; Sibbett, B.; Ward, S.H.

1980-03-01T23:59:59.000Z

82

Shemya Air Force Base, Alaska No Further Action Decision document for Hg-1. Final report  

SciTech Connect

This document is being prepared to document that a No Further Action Decision (NFAD) document is appropriate for the Hg-1 site at Shemya Air Force Base (AFB), Alaska, under the Air Force Installation Restoration Program (IRP). The IRP is a Department of Defense (DOD) program established to identify and remediate hazardous waste problems on DOD property that result from past practices. The Alaska Department of Environmental Conservation (ADEC) draft document {open_quotes}No Further Action Criteria for DOD Military/FUD Sites{close_quotes} has been used as a guide in preparing this document. Air Force personnel have stated that the Hg-1 site may have been used to store mercury and PCB-contaminated material. The site was added to the IRP in 1987, and later that year a field investigation was conducted at the site. Soil samples were collected and analyzed for mercury, EP toxicity, polychlorinated biphenyls (PCBs), and dioxin. All concentrations of contaminants found in Area Hg-1 are below regulatory action levels for PCBs (40 CFR 761) and mercury (55 FR 30798) or below detection levels for dioxin/furans. Therefore, leaving these soils in place is acceptable.

1993-03-05T23:59:59.000Z

83

Robins Air Force Base Integrated Resource Assessment. Volume 2, Baseline Detail  

Science Conference Proceedings (OSTI)

This report documents the assessment of baseline energy use at Robins Air Force Base (AFB), a US Air Force Materiel Command facility located near Macon, Georgia. This is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Air Force Materiel Command (AFMC) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Robins AFB. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Robins AFB. The analysis examines the characteristics of electric, natural gas, oil, propane, and wood chip use for fiscal year 1991. The results include energy-use intensities for the facilities at Robins AFB by building type, fuel type, and energy end use. A complete energy consumption reconciliation is presented that accounts for the distribution of all major energy uses and losses among buildings, utilities, and central systems.

Keller, J.M.; Sullivan, G.P.; Wahlstrom, R.R.; Larson, L.L.

1993-08-01T23:59:59.000Z

84

Source evaluation report phase 2 investigation: Limited field investigation. Final report: United States Air Force Environmental Restoration Program, Eielson Air Force Base, Alaska  

SciTech Connect

This report describes the limited field investigation work done to address issues and answer unresolved questions regarding a collection of potential contaminant sources at Eielson Air Force Base (AFB), near Fairbanks, Alaska. These sources were listed in the Eielson AFB Federal Facility Agreement supporting the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup of the base. The limited field investigation began in 1993 to resolve all remaining technical issues and provide the data and analysis required to evaluate the environmental hazard associated with these sites. The objective of the limited field investigation was to allow the remedial project managers to sort each site into one of three categories: requiring remedial investigation/feasibility study, requiring interim removal action, or requiring no further remedial action.

Not Available

1994-10-01T23:59:59.000Z

85

American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 224 Altus Air Force Base Solar Technologies  

DOE Green Energy (OSTI)

The principal goal of this project was to evaluate altus Air Force Base for building integrated silicon or thin film module photovoltaic opportunities. This report documents PNNL's efforts and documents study conclusions.

Russo, Bryan J.

2010-09-30T23:59:59.000Z

86

Transfer of Air Force technical procurement bid set data to small businesses, using CALS and EDI. Summary report. Revision 1  

Science Conference Proceedings (OSTI)

This report provides a summary of the Air Force CALS Test Network (AFCTN) Test Report Transfer of Air Force Technical Procurement Bid Set Data to Small Businesses, Using CALS and EDI (AFCTN Test Report 94-034, UCRL-ID-118619). It represents a synthesis of the results, conclusions, and recommendations, as well as a more concise presentation of the issues and strategies as viewed from AFCTN`s perspective. This report documents a test transfer of three Air Force technical procurement bid sets to one large and twelve small businesses, using the Department of Defense (DoD) Continuous Acquisition and Life-cycle Support (CALS) and ANSI ASC X12 Electronic Data Interchange (EDI) standards. The main goal of the test was to evaluate the effectiveness of using CALS technical data within the context of the DoD`s EDI-based standard approach to electronic commerce in procurement, with particular emphasis on receipt and use of the data by small contractors. Air Force procurement data was provided by the Sacramento Air Logistics Center at McClellan Air Force Base; the manufacturing participants were selected from among McClellan`s {open_quote}Blue Ribbon{close_quote} contractors, located throughout the United States. The test was sponsored by the Air Force CALS Test Network, headquartered at Wright-Patterson Air Force Base. The test successfully demonstrated the technical feasibility of including CALS MIL-R-28002 (Raster) engineering data in an EDI Specification/Technical Information transaction set (ANSI ASC X12 841) when issuing electronic requests for quotation to small businesses. In many cases, the data was complete enough for the contractor participant to feel comfortable generating a quote.

NONE

1995-01-10T23:59:59.000Z

87

Patrick Air Force Base integrated resource assessment. Volume 2, Baseline detail  

SciTech Connect

The US Air Force has tasked the Pacific Northwest Laboratory (PNL), in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP), to assess energy use at Patrick Air Force Base (AFB). The information obtained from this assessment will be used in identifying energy resource opportunities to reduce overall energy consumption on the base. The primary focus of this report is to assess the current baseline energy consumption at Patrick AFB. It is a comparison report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This assessment requires that information be obtained and characterized for buildings, utilities, energy sources, energy uses, and load profile information to be used to improve the characterization of energy use on the base. The characteristics of electricity, natural gas, and No. 2 fuel oil are analyzed for on-base facilities and housing. The assessment examines basic regional information used to determine energy-use intensity (EUI) values for Patrick AFB facilities by building, fuel type, and energy end use. It also provides a summary of electricity consumption from Florida Power and Light Company (FPL) metered data for 1985-1991. Load profile information obtained from FPL data is presented for the north and south substations for the four seasons of the year, including weekdays and weekends.

Wahlstrom, R.R.; King, D.A.; Parker, S.A.; Sandusky, W.F.

1993-08-01T23:59:59.000Z

88

RM Maintenance Services  

NLE Websites -- All DOE Office Websites (Extended Search)

maintenance forces are responsible for over 118 substations and almost 5300 miles of transmission lines. The Rocky Mountain Region recently updated its Metering Policy. Its...

89

Effects of WaveWave and Wave-Mean Flow Interactions on the Growth and Maintenance of Transient Planetary Waves in the Presence of a Mean Thermal Restoring Force  

Science Conference Proceedings (OSTI)

In order to clarify the effects of wavewave and wave-mean flow interactions on the growth and maintenance of extratropical tropospheric transient waves in the presence of a mean thermal restoring force, numerical experiments are conducted with ...

Y. Hayashi; D. G. Golder

1987-11-01T23:59:59.000Z

90

Model for determining modular heat recovery incinerator feasibility on air force installations. Master's thesis  

Science Conference Proceedings (OSTI)

This study constructed a model to determine the feasibility of building municipal solid waste (MSW) fired modular heat recovery incinerators (HRIs) on Air Force installations. The model consisted of three gates. Gate one identified current federal regulatory air emission requirements for various HRI pollutants. It also specified two air pollution control configurations with emission reduction efficiencies capable of achieving these requirements. Gate two presented a life-cycle cost (LCC) economic analysis methodology. Operational and cost data for existing modular HRIs located in the United States facilitated the development of regression equations that estimate capital and annual operating costs for a modular HRI. Actual cost and operational information from a central heating plant at Wright-Patterson AFB, along with cost data from the regression equations, provided the basis for an example LCC analysis involving modular HRIs Results of this hypothetical evaluation showed that the LCC for the modular HRI alternatives were both less than the LCC of replacing the existing boiler. Gate three presented a Likert-scale survey to evaluate the sociopolitical acceptability of the proposed HRI. The survey results indicate the level of effort to process the HRI proposal in accordance with the National Environmental Policy Act. Heat recovery, Incinerators, Waste management, Waste treatment.

Anderson, A.H.; Munnell, P.R.

1992-09-01T23:59:59.000Z

91

Comprehensive Energy Program at Patrick Air Force Base Set to Exceed Energy Goals  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bringing you a prosperous future where energy Bringing you a prosperous future where energy is clean, abundant, reliable, and affordable Case Study Case Study Federal Energy Management Program Federal Energy Management Program Leading by example, saving energy and taxpayer dollars in federal facilities The 45 th Space Wing at Patrick Air Force Base (PAFB) is pursuing its energy goals through a partnership with Florida Power & Light (FPL). At the request of PAFB, FPL developed a base-wide comprehensive energy program that charts a course for improving the base's energy efficiency in five phased projects and demonstrates that PAFB can exceed their federal goals for reducing energy use by 2015. The base, stretching along four miles of Florida's east coast south of Kennedy Space Center, is home to the 45

92

Comprehensive Energy Program at Patrick Air Force Base Set to Exceed Energy Goals  

NLE Websites -- All DOE Office Websites (Extended Search)

energy energy is clean, abundant, reliable, and affordable Case Study Case Study Federal Energy Management Program Federal Energy Management Program Leading by example, saving energy and taxpayer dollars in federal facilities The 45 th Space Wing at Patrick Air Force Base (PAFB) is pursuing its energy goals through a partnership with Florida Power & Light (FPL). At the request of PAFB, FPL developed a base-wide comprehensive energy program that charts a course for improving the base's energy efficiency in five phased projects and demonstrates that PAFB can exceed their federal goals for reducing energy use by 2015. The base, stretching along four miles of Florida's east coast south of Kennedy Space Center, is home to the 45 th Space Wing and more than 35

93

Development of residential-conservation-survey methodology for the US Air Force. Interim report. Task two  

DOE Green Energy (OSTI)

A US Air Force (USAF) Residential Energy Conservation Methodology was developed to compare USAF needs and available data to the procedures of the Residential Conservation Service (RCS) program as developed for general use by utility companies serving civilian customers. Attention was given to the data implications related to group housing, climatic data requirements, life-cycle cost analysis, energy saving modifications beyond those covered by RCS, and methods for utilizing existing energy consumption data in approaching the USAF survey program. Detailed information and summaries are given on the five subtasks of the program. Energy conservation alternatives are listed and the basic analysis techniques to be used in evaluating their thermal performane are described. (MCW)

Abrams, D. W.; Hartman, T. L.; Lau, A. S.

1981-11-13T23:59:59.000Z

94

Eielson Air Force Base operable unit 2 and other areas record of decision  

SciTech Connect

This decision document presents the selected remedial actions and no action decisions for Operable Unit 2 (OU2) at Eielson Air Force Base (AFB), Alaska, chosen in accordance with state and federal regulations. This document also presents the decision that no further action is required for 21 other source areas at Eielson AFB. This decision is based on the administrative record file for this site. OU2 addresses sites contaminated by leaks and spills of fuels. Soils contaminated with petroleum products occur at or near the source of contamination. Contaminated subsurface soil and groundwater occur in plumes on the top of a shallow groundwater table that fluctuates seasonally. These sites pose a risk to human health and the environment because of ingestion, inhalation, and dermal contact with contaminated groundwater. The purpose of this response is to prevent current or future exposure to the contaminated groundwater, to reduce further contaminant migration into the groundwater, and to remediate groundwater.

Lewis, R.E.; Smith, R.M.

1994-10-01T23:59:59.000Z

95

Vandenberg Air Force Base integrated resource assessment. Volume 2, Baseline detail  

SciTech Connect

The US Air Force Space Command has tasked the Pacific Northwest Laboratory, as the lead laboratory supporting the US Department of Energy Federal Energy Management Program, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Vandenberg Air Force Base (VAFB). This is a model program PNL is designing for federal customers served by the Pacific Gas and Electric Company (PG and E). The primary goal of the VAFB project is to identify all electric energy efficiency opportunities, and to negotiate with PG and E to acquire those resources through a customized demand-side management program for its federal clients. That customized program should have three major characteristics: (1) 100% up-front financing; (2) substantial utility cost-sharing; and (3) utility implementation through energy service companies under contract to the utility. A similar arrangement will be pursued with Southern California Gas for non-electric resource opportunities if that is deemed desirable by the site and if the gas utility seems open to such an approach. This report documents the assessment of baseline energy use at VAFB located near Lompoc, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Resource Assessment. This analysis examines the characteristics of electric, natural gas, fuel oil, and propane use for fiscal year 1991. It records energy-use intensities for the facilities at VAFB by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A more complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, and applicable losses.

Halverson, M.A.; Richman, E.E.; Dagle, J.E.; Hickman, B.J.; Daellenbach, K.K.; Sullivan, G.P.

1993-06-01T23:59:59.000Z

96

Transfer of Air Force technical procurement bid set data to small businesses, using CALS and EDI: Test report  

Science Conference Proceedings (OSTI)

This report documents a test transfer of three Air Force technical procurement bid sets to one large and twelve small businesses, using the Department of Defense (DoD) Continuous Acquisition and Life-cycle Support (CALS) and ANSI ASC X12 Electronic Data Interchange (EDI) standards. The main goal of the test was to evaluate the effectiveness of using CALS technical data within the context of the DoD`s EDI-based standard approach to electronic commerce in procurement, with particular emphasis on receipt and use of the data by small contractors. Air Force procurement data was provided by the Sacramento Air Logistics Center at McClellan Air Force Base; the manufacturing participants were selected from among McClellan`s ``Blue Ribbon`` contractors, located throughout the US. The test was sponsored by the Air Force CALS Test Network, headquartered at Wright-Patterson Air Force Base. The test successfully demonstrated the technical feasibility of including CALS MIL-R-28002 (Raster) engineering data in an EDI Specification/Technical Information transaction set (ANSI ASC X12 841) when issuing electronic requests for quotation to small businesses. In many cases, the data was complete enough for the contractor participant to feel comfortable generating a quote. Lessons learned from the test are being fed back to the CALS and EDI standards organizations, and to future implementors of CALS-EDI based acquisition or contracting systems, which require the transfer of technical information, such as engineering data, manufacturing process data, quality test data, and other product or process data, in the form of a CALS or other digital datafile.

NONE

1994-08-15T23:59:59.000Z

97

Air Craft Maintenance  

Science Conference Proceedings (OSTI)

... c) A RoboCrane/AMP is shown with an enclosed operator cab and front-mounted tripod manipulator, which deploys four blasting nozzles to ...

2011-08-24T23:59:59.000Z

98

(Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio)  

Science Conference Proceedings (OSTI)

In April 1990, Wright-Patterson Air Force Base (WPAFB) initiated an effort for the evaluation of potential removal of ground water contamination at the Base. This report presents a current assessment of the nature and extent of the contamination believed to be migrating across the southwestern boundary of Area C and the northern boundary of Area B based upon analysis of existing environmental data obtained from several sources. The existing data base indicates widespread, low-level contamination moving across Base boundaries at levels that pose no immediate threat to the Mad River Valley well fields. An investigation by the City of Dayton in May and June 1990, however, implies that a more identifiable plume of PCE and TCE may be crossing the southwestern boundary of Area C immediately downgradient of Landfill 5. More data is needed to delineate ground water contamination and to design and implement a suitable control system. This report concludes that although an extensive study of the boundaries in question would be the preferred approach, a limited, focused investigation and subsequent feasibility study can be accomplished with a reasonable certainty of achieving the desired outcome of this project.

Not Available

1991-10-01T23:59:59.000Z

99

The effects of aircraft noise at Williams Air Force Base Auxiliary Field on residential property values  

Science Conference Proceedings (OSTI)

This report considers the environmental consequences of moving the flight training operations of the US Air Force's 82nd Flying Training Wing from the auxiliary airfield, Coolidge-Florence Municipal Airport (CFMA), to a more remote location in Pinal County, Arizona. It examines how actual noise from touch-and-go flights of T-37 aircraft and perceived (anticipated) noise affect the market value of residential property near CFMA. Noise, measured by a noise index, is correlated with market values through a regression analysis applied to a hedonic price model of the Coolidge-Florence housing market. Prices and characteristics of 42 residential properties sold in 1987 and 1988 were used to estimate a perceived noise effect. The report finds that the coefficient on the measure of perceived noise, based on the noise exposure forecast (NEF) index, is statistically insignificant, even though the sign and value are consistent with those estimated in other studies. It concludes that current flights do not have a significant effect on residential property values, partially because there is no housing near CFMA. This and larger studies indicate that flight operations at a new auxiliary airfield would not affect property values if runways were at least 12,000 feet away from housing. 12 refs., 2 tabs.

Morey, M.J.

1990-11-01T23:59:59.000Z

100

Field Measurements of Heating Efficiency of Electric Forced-Air Furnaces in Six Manufactured Homes.  

Science Conference Proceedings (OSTI)

This report presents the results of field measurements of heating efficiency for six manufactured homes in the Pacific Northwest heated with electric forced-air systems. This is the first in a series of regional and national efforts to measure in detail the heating efficiency of manufactured homes. Only six homes were included in this study because of budgetary constraints; therefore this is not a representative sample. These investigations do provide some useful information on the heating efficiency of these homes. Useful comparisons can be drawn between these study homes and site-built heating efficiencies measured with a similar protocol. The protocol used to test these homes is very similar to another Ecotope protocol used in the study conducted in 1992 and 1993 for the Bonneville Power Administration to test the heating efficiency of 24 homes. This protocol combined real-time power measurements of furnace energy usage with energy usage during co-heat periods. Accessory data such as house and duct tightness measurements and tracer gas measurements were used to describe these homes and their heating system efficiency. Ensuring that manufactured housing is constructed in an energy and resource efficient manner is of increasing concern to manufactured home builders and consumers. No comparable work has been done to measure the heating system efficiency of MCS manufactured homes, although some co-heat tests have been performed on manufactured homes heated with natural gas to validate HUD thermal standards. It is expected that later in 1994 more research of this kind will be conducted, and perhaps a less costly and less time-consuming method for testing efficiencies will be develops.

Davis, Bob; Palmiter, Larry S.; Siegel, Jeff

1994-07-26T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Simple Maintenance Saves Costly Furnace Repair/Replacement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement January 6, 2010 - 8:26am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the controls to provide optimum water and air temperature settings for both efficiency and comfort Having a technician perform a combustion-efficiency test Checking the combustion chamber for cracks. Testing for carbon monoxide

102

Field Measurements of Efficiency and Duct Effectiveness in Residential Forced Air Distributions Systems  

E-Print Network (OSTI)

sealing and insulating the duct system. ABSTRACT Forced airair conditioning, gas furnaces, electric furnaces and heat pumps. The retrofits consisted of sealing

Jump, D.A.

2011-01-01T23:59:59.000Z

103

Closure Report for Corrective Action Unit 486: Double Tracks RADSAFE Area Nellis Air Force Range, Nevada  

Science Conference Proceedings (OSTI)

The Double Tracks Radiological Safety Area (DTRSA), Corrective Action Unit (CAU) 486, was clean-closed following the approved Corrective Action Decision Document closure alternative and in accordance with the Federal Facility Agreement and Consent Order. The CAU consists of a single Corrective Action Site, 71-23-001-71DT. The DTRSA was used during May 1963 to decontaminate vehicles, equipment, personnel and animals from the Double Tracks Test. Double Tracks was one of four storage-transportation tests. The Double Tracks test was conducted in Stonewall Flat, approximately 32 kilometers (20 miles) east of Goldfield, Nevada, on the Nellis Air Force Range. The Double Tracks Test used a single device containing plutonium and depleted uranium and was designed to investigate the characteristics of plutonium-bearing particulate material formed by the non-nuclear detonation of a nuclear weapon. All facilities associated with the DTRSA operation were removed. Based on available information, the areas of concern at the DTRSA consisted of a decon facility (vehicle decon pad and decon sump) in the southern half of the DTRSA, and a burial pit and former loading/unloading area located in the northern half of the DTRSA. Based on the results of the Corrective Action Investigation, radiological field screening detected elevated gamma and alpha readings on excavated plastic debris. Swipe surveys taken on the plastic debris detected removable alpha. No contaminants were detected above preliminary action levels in soil samples. The debris excavated during the corrective action investigation was not characterized. The clean-closure corrective action consisted of excavation, disposal, verification sampling, backfilling, and regrading. Field activities began on May 1, 2000, and ended on May 10, 2000. Soil that was associated with the radiologically contaminated man-made debris was placed into B-25 bins, moved to the designated waste management area where it was scanned, and hauled off-site for disposal. Verification soil samples were collected and analyzed to determine if clean closure had bene achieved. Clean borrow soil was hauled to the site and used to backfill the excavation. The excavation was then regraded to promote drainage and minimize ponding of surface water. Since the site is clean-closed, post-closure care is not required.

D. H. Cox

2000-12-01T23:59:59.000Z

104

Perimeter fan performance in forced draught air-cooled steam condensers.  

E-Print Network (OSTI)

??ENGLISH ABSTRACT: Axial flow fan arrays form part of air-cooled steam condensers in direct drycooled power plants. This dissertation investigates the performance of axial flow (more)

Van der Spuy, Sybrand Johannes

2011-01-01T23:59:59.000Z

105

Comparison between predicted duct effectiveness from proposed ASHRAE Standard 152P and measured field data for residential forced air cooling systems  

E-Print Network (OSTI)

for Forced Air Systems in Proposed ASHRAE Standard 152P.ASHRAE Transactions, 104(1B), 1360-1375. Walker I, ShermanDuct Effectiveness from Proposed ASHRAE Standard 152P and

Siegel, Jeffrey A.; McWilliams, Jennifer A.; Walker, Iain S.

2002-01-01T23:59:59.000Z

106

LIEUTENANT COLONEL BRIAN K SCHROEDER Lieutenant Colonel Brian Schroeder is Operations Officer for the Air Force  

E-Print Network (OSTI)

2007 Air Command and Staff College ASSIGNMENT HISTORY 1. June 1995 ­ June 1997: Wing Weather Officer ­ July 2005: Commander, Detachment 1, 607th WS, Camp Red Cloud, South Korea 6. July 2005 ­ June 2007

Peterson, Blake R.

107

Estimating Contemporary and Future Wind-Damage Losses from Hurricanes Affecting Eglin Air Force Base, Florida  

Science Conference Proceedings (OSTI)

The strongest hurricanes over the North Atlantic Ocean are getting stronger, with the increase related to rising ocean temperature. Here, the authors develop a procedure for estimating future wind losses from hurricanes and apply it to Eglin Air ...

James B. Elsner; Shawn W. Lewers; Jill C. Malmstadt; Thomas H. Jagger

2011-07-01T23:59:59.000Z

108

Offshore software maintenance methodology  

Science Conference Proceedings (OSTI)

Keywords: maintenance methodology, offshore maintenance, remote maintenance, software economics, software maintenance

M. Pavan Kumar; V. Sita Rama Das; N. Netaji

1996-05-01T23:59:59.000Z

109

Feasibility study of burning waste paper in coal-fired boilers on Air Force installations. Master's thesis  

Science Conference Proceedings (OSTI)

This thesis examined the feasibility of using waste paper derived fuel in coal-fired boilers on Air Force installations in an attempt to help solve air pollution and solid waste disposal problems. The implementation of waste paper derived fuel was examined from both a technical acceptability and an economic feasibility viewpoint. The majority of data for this study was obtained through literature reviews and personal interviews. Waste paper was found to be technically acceptable for use as fuel. However, waste paper has certain characteristics that may create problems during combustion and therefore further research is required. These problems included the possibility of increased nitrous oxide emissions, increased volatile emissions, dioxin and furan emissions, formation of hydrochloric acid, and the presence of heavy metals in emissions and ash.

Smith, K.P.

1993-09-01T23:59:59.000Z

110

Original article: Lumped-parameter-based thermal analysis of a doubly radial forced-air-cooled direct-driven permanent magnet wind generator  

Science Conference Proceedings (OSTI)

A lumped-parameter-based thermal analysis of a direct-driven permanent magnet wind generator with double radial forced-air cooling is presented. In the proposed thermal model, the thermal conduction and convection as well as the heating of the cooling ... Keywords: Air cooling, Permanent magnet synchronous generator, Thermal analysis, Thermal resistance networks

Janne Nerg, Vesa Ruuskanen

2013-04-01T23:59:59.000Z

111

Atmospheric Forcing of the Winter AirSea Heat Fluxes over the Northern Red Sea  

Science Conference Proceedings (OSTI)

The influence of the atmospheric circulation on the winter airsea heat fluxes over the northern Red Sea is investigated during the period 19852011. The analysis based on daily heat flux values reveals that most of the net surface heat exchange ...

Vassilis P. Papadopoulos; Yasser Abualnaja; Simon A. Josey; Amy Bower; Dionysios E. Raitsos; Harilaos Kontoyiannis; Ibrahim Hoteit

2013-03-01T23:59:59.000Z

112

Simulations of sizing and comfort improvements for residential forced-air heating and cooling systems  

SciTech Connect

In many parts of North America residential HVAC systems are installed outside conditioned space. This leads to significant energy losses and poor occupant comfort due to conduction and air leakage losses from the air distribution ducts. In addition, cooling equipment performance is sensitive to air flow and refrigerant charge that have been found to be far from manufacturers specifications in most systems. The simulation techniques discussed in this report were developed in an effort to provide guidance on the savings potentials and comfort gains that can be achieved by improving ducts (sealing air leaks) and equipment (correct air-flow and refrigerant charge). The simulations include the complex air flow and thermal interactions between duct systems, their surroundings and the conditioned space. They also include cooling equipment response to air flow and refrigerant charge effects. Another key aspect of the simulations is that they are dynamic to account for cyclic losses from the HVAC system and the effect of cycle length on energy and comfort performance. To field test the effect of changes to residential HVAC systems requires extensive measurements to be made for several months for each condition tested. This level of testing is often impractical due to cost and time limitations. Therefore the Energy Performance of Buildings Group at LBNL developed a computer simulation tool that models residential HVAC system performance. This simulation tool has been used to answer questions about equipment downsizing, duct improvements, control strategies and climate variation so that recommendations can be made for changes in residential construction and HVAC installation techniques that would save energy, reduce peak demand and result in more comfortable homes. Although this study focuses on California climates, the simulation tool could easily be applied to other climates. This report summarizes the simulation tool and discusses the significant developments that allow the use of this tool to perform detailed residential HVAC system simulations. The simulations have been verified by comparison to measured results in several houses over a wide range of weather conditions and HVAC system performance. After the verification was completed, more than 350 cooling and 450 heating simulations were performed. These simulations covered a range of HVAC system performance parameters and California climate conditions (that range from hot dry deserts to cold mountain regions). The results of the simulations were used to show the large increases in HVAC system performance that can be attained by improving the HVAC duct distribution systems and by better sizing of residential HVAC equipment. The simulations demonstrated that improved systems can deliver improved heating or cooling to the conditioned space, maintain equal or better comfort while reducing peak demand and the installed equipment capacity (and therefore capital costs).

Walker, I.S.; Degenetais, G.; Siegel, J.A.

2002-05-01T23:59:59.000Z

113

Hydrologic transport of depleted uranium associated with open air dynamic range testing at Los Alamos National Laboratory, New Mexico, and Eglin Air Force Base, Florida  

SciTech Connect

Hydrologic investigations on depleted uranium fate and transport associated with dynamic testing activities were instituted in the 1980`s at Los Alamos National Laboratory and Eglin Air Force Base. At Los Alamos, extensive field watershed investigations of soil, sediment, and especially runoff water were conducted. Eglin conducted field investigations and runoff studies similar to those at Los Alamos at former and active test ranges. Laboratory experiments complemented the field investigations at both installations. Mass balance calculations were performed to quantify the mass of expended uranium which had transported away from firing sites. At Los Alamos, it is estimated that more than 90 percent of the uranium still remains in close proximity to firing sites, which has been corroborated by independent calculations. At Eglin, we estimate that 90 to 95 percent of the uranium remains at test ranges. These data demonstrate that uranium moves slowly via surface water, in both semi-arid (Los Alamos) and humid (Eglin) environments.

Becker, N.M. [Los Alamos National Lab., NM (United States); Vanta, E.B. [Wright Laboratory Armament Directorate, Eglin Air Force Base, FL (United States)

1995-05-01T23:59:59.000Z

114

Characterization of the Drag Force in an Air-Moderated Granular Bed  

E-Print Network (OSTI)

We measure the torque acting on a rod rotated perpendicular to its axis in a granular bed, through which an upflow of gas is utilized to tune the hydrostatic loading between grains. At low rotation rates the torque is independent of speed, but scales quadratically with rod-length and linearly with depth; the proportionality approaches zero linearly as the upflow of gas is increased towards a critical value above which the grains are fluidized. At high rotation rates the torque exhibits quadratic rate- dependence and scales as the rod's length to the 4th power. The torque has no dependence on either depth or airflow at these higher rates. A model used to describe the stopping force experienced by a projectile impacting a granular bed can be shown to predict these behaviors for our system's geometry, indicating that the same mechanics dictate both steady-state and transient drag forces in granular systems, regardless of geometry or material properties of the grains.

Theodore A Brzinski III; Douglas J Durian

2009-12-14T23:59:59.000Z

115

Radiation Control Coatings Installed on Federal Buildings at Tyndall Air Force Base  

DOE Green Energy (OSTI)

The technical objectives of this CRADA comprise technology deployment and energy conservation efforts with the radiation control coatings industry and the utility sector. The results of this collaboration include a high-level data reporting, analysis and management system to support the deployment efforts. The technical objectives include successfully install, commission, operate, maintain and document the performance of radiation control coatings on roofs at Tyndall AFB and the Buildings Technology Center at the Oak Ridge National Laboratory; determine the life cycle savings that can be achieved by using radiation control coatings on entire roofs at Tyndall AFB, based on documented installed cost and operating maintenance costs with and without the coatings; determine if any specific improvements are required in the coatings before they can be successfully deployed in the federal sector; determine the most effective way to facilitate the widespread and rapid deployment of radiation control coatings in the federal sector; and clearly define any barriers to deployment.

Kaba, R.L.; Petrie, T.W.

1999-03-16T23:59:59.000Z

116

Pacific Gas and Electric Company's Compressed Air Management Program: A Performance Assessment Approach to Improving Industrial Compressed Air System Operation and Maintenance  

E-Print Network (OSTI)

The Compressed Air Management Program (CAMP) provides Pacific Gas and Electric's (PG&E's) large industrial customers with measurement-based performance assessments of their compressed air systems. Under this program, the customer's system is inspected and both short-term, high resolution, and longer-term measurements are taken of power and pressure. These data are used in developing a system simulation based on the US DOE's AIRMaster+ computer model. Model results and professional judgment are used to identify a cost-effective strategy for improving the system. Recommendations are provided to the customer along with technical support for implementing these recommendations. After improvements are complete, the performance measurements are repeated so that PG&E and its customers can judge the effectiveness of the recommendations. The program uses a standardized toolkit (all off-the-shelf components) along with software developed exclusively for this application, to accomplish the required measurements and efficiently analyze and reduce the data for use in the AIRMaster+ model.

Qualmann, R. L.; Zeller, W.; Baker, M.

2002-04-01T23:59:59.000Z

117

Risk assessment of the health liabilities from exposure to toxic metals found in the composted material of Air Force municipal solid waste. Master's thesis  

Science Conference Proceedings (OSTI)

This thesis assesses the risk of the health liabilities from exposure to toxic metals found in the composted material of Air Force municipal solid waste (MSW). The goal is to determine the probability that the composted MSW could be a health hazard if it were used as a soil amendment. The research limited the assessment of the exposure risk to heavy metals found in raw MSW and its resulting compost. The thesis uses reviews of present literature to examine the food and soil ingestion exposure pathways. These pathways are assessed using the heavy metal concentrations found in MSW compost and the soil-plant partition coefficients of vegetables grown in soil mixed with sewage sludge or soil irrigated with sewage sludge or soil irrigated with sewage sludge leachate. The recommendation resulting from this research is that the Air Force should not use MSW composting as part of its future solid waste management plan. This alternative to landfilling contains a chronic health risk that is greater than the Environmental Protection Agency's guideline. If the Air Force would use MSW composting in the future, it may endanger Air Force personnel and others who use the compost created from Air Force MSW. Risk assessment, Heavy metals, Recycling municipal solid waste, Pollution, Composting.

Merrymon, T.L.

1993-09-01T23:59:59.000Z

118

The reliability of the government cost estimate as an evaluator of the low bid in US Air Force Construction Projects  

E-Print Network (OSTI)

This study proposes to scientifically assess the reliability of previous government cost estimates in evaluating construction project bids and to examine the usefulness of discordancy testing methods as an alternative to the government estimate in evaluating the low bid. A random sample of US Air Force Military Construction (MILCON) projects bid between I Oct 92 and 30 Jun 95 are divided into four subgroups for examination. Sampling distributions are generated in order to determine the mean of the ratio difference between the low bid or median bid and the government cost estimate. A null hypothesis is tested for each comparison. Conclusions are drawn about government cost estimate accuracy, consistency, and reliability. Two discordancy testing methods are examined for their usefulness in evaluating a low bid. A null hypothesis is tested for the significance of detection rates. Conclusions are drawn about the performance of each discordancy test.

Strucely, Timothy David

1995-01-01T23:59:59.000Z

119

African Easterly Jet: Structure and Maintenance  

Science Conference Proceedings (OSTI)

This article investigates the African easterly jet (AEJ), its structure, and the forcings contributing to its maintenance, critically revisiting previous work that attributed the maintenance of the jet to soil moisture gradients over tropical ...

Man-Li C. Wu; Oreste Reale; Siegfried D. Schubert; Max J. Suarez; Randy D. Koster; Philip J. Pegion

2009-09-01T23:59:59.000Z

120

The air assault expeditionary force (AAEF) experiment: examining the impact of technology on battle command using live, virtual and constructive simulation  

Science Conference Proceedings (OSTI)

The AAEF Campaign of Discovery Experiments is the principal series of prototype discovery experiments conducted within the US Army. The campaign was originally approved for four annual excursions, 2004--2007, but has been tentatively extended through ... Keywords: air assault expeditionary force (AAEF), army test and evaluation command (ATEC), constructive, live, soldier battle laboratory (SBL), spiral C, virtual

Robert M. Lehnherr; Steven E. Strukel

2007-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Operations & Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

122

[Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio]. Volume 1, Site assessment report  

SciTech Connect

In April 1990, Wright-Patterson Air Force Base (WPAFB) initiated an effort for the evaluation of potential removal of ground water contamination at the Base. This report presents a current assessment of the nature and extent of the contamination believed to be migrating across the southwestern boundary of Area C and the northern boundary of Area B based upon analysis of existing environmental data obtained from several sources. The existing data base indicates widespread, low-level contamination moving across Base boundaries at levels that pose no immediate threat to the Mad River Valley well fields. An investigation by the City of Dayton in May and June 1990, however, implies that a more identifiable plume of PCE and TCE may be crossing the southwestern boundary of Area C immediately downgradient of Landfill 5. More data is needed to delineate ground water contamination and to design and implement a suitable control system. This report concludes that although an extensive study of the boundaries in question would be the preferred approach, a limited, focused investigation and subsequent feasibility study can be accomplished with a reasonable certainty of achieving the desired outcome of this project.

Not Available

1991-10-01T23:59:59.000Z

123

Systematic method for the condition assessment of central heating plants in Air Force Logistics Command. Master's thesis  

Science Conference Proceedings (OSTI)

Air Force Logistics Command (AFLC), facing decreasing funds and aging utility systems, needed a method to objectively rate its central heating plants. Such a rating system would be used to compare heating plants throughout the command to identify potential problem areas and prioritize major repair projects. This thesis used a Delphi questionnaire to gather opinions from heating plant experts in order to identify and prioritize components considered most critical to overall plant operation. In addition, the experts suggested measurements which could be used to evaluate component conditions. By combining expert opinions and reading from technical literature, component model rating schemes were developed for AFLC's steam and high temperature hot water plants. Based on measurements and observations of critical components in the plant, a score between 0 and 100 is assigned to each component (for example, condensate piping, deaerator, etc.), each plant subsystem (distribution system, water treatment system, etc.), and to the plant as a whole. These component model rating schemes and the resultant overall condition index scores will enable AFLC to focus their management attention and allocate needed resources to the plants in greatest need of repair.

Starmack, G.J.

1990-09-01T23:59:59.000Z

124

Engineering Technical Letter (ETL) 11-28: Mandatory Review and Update of Record Drawings for Nuclear-Capable Weapons and Munitions Storage and Maintenance Facilities  

E-Print Network (OSTI)

1. Purpose. This ETL provides criteria for munitions and nuclear weapons-capable maintenance and storage facilities (munitions storage areas [MSA] and weapons storage areas [WSA]) which are existing, under design, or under contract, and located in the continental United States (CONUS). It addresses requirements for reviewing and updating record drawings and requirements for as-built drawings for projects under design or under contract. Future project requirements will be addressed in a revision of Air Force instruction (AFI) 32-1065, Grounding Systems. 2. Application: Air Force installations with munitions and nuclear weapons-capable maintenance and storage facilities. The requirements in this ETL are mandatory.

Major Comm; Majcom Electrical Engineers

2011-01-01T23:59:59.000Z

125

[Environmental investigation of ground water contamination at Wright- Patterson Air Force Base, Ohio]. Volume 4, Health and Safety Plan (HSP); Phase 1, Task 4 Field Investigation report: Draft  

SciTech Connect

This Health and Safety Plan (HSP) was developed for the Environmental Investigation of Ground-water Contamination Investigation at Wright-Patterson Air Force Base near Dayton, Ohio, based on the projected scope of work for the Phase 1, Task 4 Field Investigation. The HSP describes hazards that may be encountered during the investigation, assesses the hazards, and indicates what type of personal protective equipment is to be used for each task performed. The HSP also addresses the medical monitoring program, decontamination procedures, air monitoring, training, site control, accident prevention, and emergency response.

Not Available

1991-10-01T23:59:59.000Z

126

An aerial radiological survey of the Davis-Monthan Air Force Base and surrounding area, Tucson, Arizona  

SciTech Connect

An aerial radiological survey, which was conducted from March 1 to 13, 1995, covered a 51-square-mile (132-square-kilometer) area centered on the Davis-Monthan Air Force Base (DMAFB) in Tucson, Arizona. The results of the survey are reported as contours of bismuth-214 ({sup 214}Bi) soil concentrations, which are characteristic of natural uranium and its progeny, and as contours of the total terrestrial exposure rates extrapolated to one meter above ground level. All data were scaled and overlaid on an aerial photograph of the DMAFB area. The terrestrial exposure rates varied from 9 to 20 microroentgens per hour at one meter above the ground. Elevated levels of terrestrial radiation due to increased concentrations of {sup 214}Bi (natural uranium) were observed over the Southern Pacific railroad yard and along portions of the railroad track bed areas residing both within and outside the base boundaries. No man-made, gamma ray-emitting radioactive material was observed by the aerial survey. High-purity germanium spectrometer and pressurized ionization chamber measurements at eight locations within the base boundaries were used to verify the integrity of the aerial results. The results of the aerial and ground-based measurements were found to be in agreement. However, the ground-based measurements were able to detect minute quantities of cesium-137 ({sup 137}Cs) at six of the eight locations examined. The presence of {sup 137}Cs is a remnant of fallout from foreign and domestic atmospheric nuclear weapons testing that occurred in the 1950s and early 1960s. Cesium-137 concentrations varied from 0.1 to 0.3 picocuries per gram, which is below the minimum detectable activity of the aerial system.

NONE

1995-09-01T23:59:59.000Z

127

Health assessment for Ellsworth Air Force Base, Ellsworth AFB, Pennington County, South Dakota, Region 8. Cerclis No. SD2571924644. September 30, 1993. Final report  

SciTech Connect

Ellsworth Air Force Base (EAFB) is a 4,858 acre facility in southwestern South Dakota, 5.7 miles northeast of Rapid City. EAFB has handled or disposed of general refuse, construction debris, and hazardous chemicals (primarily fuels and solvents) since it was activated in July of 1942. ATSDR has determined that EAFB is an indeterminate public health hazard because all of the information needed to evaluate the health hazards posed by the nine sites on EAFB has not been collected.

1993-09-30T23:59:59.000Z

128

Predictive Maintenance Program: Development and Implementation  

Science Conference Proceedings (OSTI)

Many forces -- the economy, competition, regulatory agencies -- are pressuring utilities to reduce operating and maintenance (O&M) costs without cutting back on reliability or availability. Many utility managers are re-evaluating their maintenance strategies to meet these demands. To show utilities how to reduce maintenance costs and extend the effective operating life of equipment, EPRI has organized an annual workshop around a unique management approach -- Predictive Maintenance (PDM).

1999-06-25T23:59:59.000Z

129

A Comparison of Atmospheric Reanalysis Surface Products over the Ocean and Implications for Uncertainties in AirSea Boundary Forcing  

E-Print Network (OSTI)

This paper investigates the uncertainties related to atmospheric fields from reanalysis products used in forcing ocean models. Four reanalysis products, namely from 1) the interim ECMWF Re-Analysis (ERA-Interim), 2) version ...

Chaudhuri, Ayan H.

130

A Comparison of Atmospheric Reanalysis Surface Products over the Ocean and Implications for Uncertainties in AirSea Boundary Forcing  

Science Conference Proceedings (OSTI)

This paper investigates the uncertainties related to atmospheric fields from reanalysis products used in forcing ocean models. Four reanalysis products, namely from 1) the interim ECMWF Re-Analysis (ERA-Interim), 2) version 2 of the Common ...

Ayan H. Chaudhuri; Rui M. Ponte; Gael Forget; Patrick Heimbach

2013-01-01T23:59:59.000Z

131

Management impact assessment of refuse-derived fuel implementation at Wright-Patterson Air Force Base. Final report 30 Sep 80-11 Mar 81  

Science Conference Proceedings (OSTI)

This study has shown that the impact of specifying, procuring, using, and monitoring refuse-derived fuel (RDF) on the organizational structure and the operations and management activities of Wright-Patterson Air Force Base has been generally minimal and essentially absorbed into the various ongoing functional activities. However, the project manager devoted over 75 percent of his time to the program since it started and additional housecleaning personnel were assigned to the operating staff to remove the dust and debris resulting from the RDF. The research and development nature of this particular activity contributes to the necessity of having a project manager with time to keep the program on track and interested persons informed as to its progress. Weather this impact would be reflected in follow-on implementation programs is problematic and dependent upon how the program is viewed locally, the need for further RandD, and the visibility required or desired. The level of effort dedicated to this project was 5.6 man-years the first year and is expected to be 4.0 man-years the second year. The associated salary costs are $130,500 and $86,500, respectively. An assessment of the applicability of CITA to the operation of the RDF facility at WPAFB indicates that this and other Air Force central heating plants will be reviewed for possible contract operation in FY 1984.

Huff, W.J.; McIntosh, R.K.

1982-03-19T23:59:59.000Z

132

A Model of the AirSea Momentum Flux and Breaking-Wave Distribution for Strongly Forced Wind Waves  

Science Conference Proceedings (OSTI)

Under high-wind conditions, breaking surface waves likely play an important role in the airsea momentum flux. A coupled windwave model is developed based on the assumption that in the equilibrium range of surface wave spectra the wind stress is ...

Tobias Kukulka; Tetsu Hara; Stephen E. Belcher

2007-07-01T23:59:59.000Z

133

FMAC FD & ID Maintenance Guide  

Science Conference Proceedings (OSTI)

A continuous flow of air and combustible gases in fossil power plants is required to supply the correct amount of combustion air and to remove the gaseous combustion products. This flow, which passes through ducts, the boiler, heat exchangers, and flues and stacks, is created and sustained by stacks and/or fans. In fossil stations, supply air fans are often referred to as forced draft (FD) fans and are used to push air through the combustion air supply system into the furnace. Some stations also use fans...

2004-12-21T23:59:59.000Z

134

Forced convective flow and heat transfer of upward cocurrent air-water slug flow in vertical plain and swirl tubes  

SciTech Connect

This experimental study comparatively examined the two-phase flow structures, pressured drops and heat transfer performances for the cocurrent air-water slug flows in the vertical tubes with and without the spiky twisted tape insert. The two-phase flow structures in the plain and swirl tubes were imaged using the computerized high frame-rate videography with the Taylor bubble velocity measured. Superficial liquid Reynolds number (Re{sub L}) and air-to-water mass flow ratio (AW), which were respectively in the ranges of 4000-10000 and 0.003-0.02 were selected as the controlling parameters to specify the flow condition and derive the heat transfer correlations. Tube-wise averaged void fraction and Taylor bubble velocity were well correlated by the modified drift flux models for both plain and swirl tubes at the slug flow condition. A set of selected data obtained from the plain and swirl tubes was comparatively examined to highlight the impacts of the spiky twisted tape on the air-water interfacial structure and the pressure drop and heat transfer performances. Empirical heat transfer correlations that permitted the evaluation of individual and interdependent Re{sub L} and AW impacts on heat transfer in the developed flow regions of the plain and swirl tubes at the slug flow condition were derived. (author)

Chang, Shyy Woei [Thermal Fluids Laboratory, National Kaohsiung Marine University, No. 142, Haijhuan Road, Nanzih District, Kaohsiung City 81143 (China); Yang, Tsun Lirng [Department of Marine Engineering, National Kaohsiung Marine University, No. 142, Haijhuan Road, Nanzih District, Kaohsiung City 81143 (China)

2009-10-15T23:59:59.000Z

135

Overview of the Second Quarter 2011 Surveillance and Maintenance...  

Office of Legacy Management (LM)

Maintenance and optimization of pilot air stripper No freezing observed Reduced solar availability reduced power available, causing pump to stop Resolved power issues...

136

Successful Demolition of Historic Cape Canaveral Air Force Station Launch Facilities: Managing the Process to Maximize Recycle Value to Fund Demolition  

SciTech Connect

This paper will present the history of the Atlas 36 and Titan 40 Space Launch Complexes (SLC), the facility assessment process, demolition planning, recycle methodology, and actual facility demolition that resulted in a 40% reduction in baseline cost. These two SLC launched hundreds of payloads into space from Cape Canaveral Air Force Station (AFS), Florida. The Atlas-Centaur family of rockets could lift small- to medium-size satellites designed for communications, weather, or military use, placing them with near pinpoint accuracy into their intended orbits. The larger Titan family was relied upon for heavier lifting needs, including launching military satellites as well as interplanetary probes. But despite their efficiency and cost-effectiveness, the Titan rockets, as well as earlier generation Atlas models, were retired in 2005. Concerns about potential environmental health hazards from PCBs and lead-based paint chipping off the facilities also contributed to the Air Force's decision in 2005 to dismantle and demolish the Atlas and Titan missile-launching systems. Lockheed Martin secured the complex following the final launch, removed equipment and turned over the site to the Air Force for decommissioning and demolition (D and D). AMEC was retained by the Air Force to perform demolition planning and facility D and D in 2004. AMEC began with a review of historical information, interviews with past operations personnel, and 100% facility assessment of over 100 structures. There where numerous support buildings that due to their age contained asbestos containing material (ACM), PCB-impacted material, and universal material that had to be identified and removed prior to demolition. Environmental testing had revealed that the 36B mobile support tower (MST) exceeded the TSCA standard for polychlorinated biphenyls (PCB) paint (<50 ppm), as did the high bay sections of the Titan Vertical Integration Building (VIB). Thus, while most of the steel structures could be completely recycled, about one-third of 36B MST and the affected areas of the VIB were to be consigned to an on-site regulated waste landfill. In all, it is estimated that approximately 10,000,000 kg (11,000 tons) of PCB-coated steel will be land-filled and 23,000,000 kg (25,000 tons) will be recycled. The recycling of the steel and other materials made it possible to do additional demolition by using these funds. Therefore, finding ways to maximize the recycle value of materials became a key factor in the pre-demolition characterization and implementation strategy. This paper will present the following: - Critical elements in demolition planning working at an active launch facility; - Characterization and strategy to maximize steel recycle; - Waste disposition strategy to maximize recycle/reuse and minimize disposal; - Recycle options available at DOD installations that allow for addition funds for demolition; - Innovation in demolition methodologies for large structures - explosive demolition and large-scale dismantlement; - H and S aspects of explosive demolition and large scale dismantlement. In conclusion: The Cape Canaveral AFS Demolition Program has been a great success due to the integration of multiple operations and contractors working together to determine the most cost-effective demolition methods. It is estimated that by extensive pre-planning and working with CCAFS representatives, as well as maximizing the recycle credits of various material, primarily steel, that the government will be able to complete what was base-lined to be a $30 M demolition program for < $20 M. Other factors included a competitive subcontractor environment where they were encouraged with incentives to maximize recycle/reuse of material and creative demolition solutions. Also, by overlapping multiple demolition tasks at multiple facilities allowed for a reduction in field oversight. (authors)

Jones, A.; Hambro, L. [AMEC Earth and Environmental, Inc., Cocoa, FL (United States); Hooper, K. [U.S. Air Force 45th Space Wing, Patrick AFB, Florida (United States)

2008-07-01T23:59:59.000Z

137

An aerial radiological survey of the Kennedy Space Center and Cape Canaveral Air Force Station and surrounding area, Titusville, Florida: Date of survey: October 1985  

Science Conference Proceedings (OSTI)

An aerial radiological survey of the entire Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) was performed during the period 9 through 23 October 1985. This survey was conducted in three parts. First, a low resolution, low sensitivity background survey was performed that encompassed the entire KSC and CCAFS area. Next, two smaller, high resolution, high sensitivity surveys were conducted: the first focused on Launch Complexes 39A and 39B, and the second on the Shuttle Landing Facility. The areas encompassed by the surveys were 200, 5.5, and 8.5 square miles (500, 14, and 22 sq km), respectively. The purpose of these surveys was to provide information useful for an emergency response to a radiological accident. Results of the background survey are presented as isoradiation contour maps of both total exposure rate and man-made gross count superimposed on a mosaic of recent aerial photographs. Results of the two small, detailed surveys are also presented as an isoradiation contour map of exposure rate on the aerial photograph base. These data were evaluated to establish sensitivity limits for mapping the presence of plutonium-238. Natural background exposure rates at the Kennedy Space Center and Cape Canaveral Air Force Station are very low, generally ranging from 4 to 6.5 microroentgens per hour (..mu..R/h) and less than 4 ..mu..R/h in wet areas. However, exposure rates in developed areas were observed to be higher due to the importation of construction materials not characteristic of the area. 8 refs., 3 figs., 4 tabs.

Not Available

1988-01-01T23:59:59.000Z

138

Clean Cities ozone air quality attainment and maintenance strategies that employ alternative fuel vehicles, with special emphasis on natural gas and propane  

DOE Green Energy (OSTI)

Air quality administrators across the nation are coming under greater pressure to find new strategies for further reducing automotive generated non-methane hydrocarbon (NMHC) and nitrogen oxide (NOx) emissions. The US Environmental Protection Agency (EPA) has established stringent emission reduction requirements for ozone non-attainment areas that have driven the vehicle industry to engineer vehicles meeting dramatically tightened standards. This paper describes an interim method for including alternative-fueled vehicles (AFVs) in the mix of strategies to achieve local and regional improvements in ozone air quality. This method could be used until EPA can develop the Mobile series of emissions estimation models to include AFVs and until such time that detailed work on AFV emissions totals by air quality planners and emissions inventory builders is warranted. The paper first describes the challenges confronting almost every effort to include AFVs in targeted emissions reduction programs, but points out that within these challenges resides an opportunity. Next, it discusses some basic relationships in the formation of ambient ozone from precursor emissions. It then describes several of the salient provisions of EPA`s new voluntary emissions initiative, which is called the Voluntary Mobile Source Emissions Reduction Program (VMEP). Recent emissions test data comparing gaseous-fuel light-duty AFVs with their gasoline-fueled counterparts is examined to estimate percent emissions reductions achievable with CNG and LPG vehicles. Examples of calculated MOBILE5b emission rates that would be used for summer ozone season planning purposes by an individual Air Quality Control Region (AQCR) are provided. A method is suggested for employing these data to compute appropriate voluntary emission reduction credits where such (lighter) AFVs would be acquired. It also points out, but does not quantify, the substantial reduction credits potentially achievable by substituting gaseous-fueled for gasoline-fueled heavy-duty vehicles. Finally, it raises and expands on the relevance of AFVs and their deployment to some other provisions embedded in EPA`s current guidance for implementing 1-hour NAAQS--standards which currently remain in effect--as tools to provide immediate reductions in ozone, without waiting for promised future clean technologies.

Santini, D.J.; Saricks, C.L.

1998-08-04T23:59:59.000Z

139

Optimized Maintenance of Generator Rotors  

Science Conference Proceedings (OSTI)

Generator rotor maintenance options are limited and expensive. The timing and scope of work done requires optimization to obtain the maximum benefits for continued long-term trouble-free operation. This document is a comprehensive guide to the maintenance of large generator rotors of 2 and 4 pole design that are cooled directly or indirectly by air or hydrogen. These include 50 and 60 Hz machines, operating at speeds of 1500, 1800, 3000, and 3600 RPM. The guide does not cover water-cooled rotors. The inf...

2004-12-13T23:59:59.000Z

140

Pulverizer Maintenance Guide  

Science Conference Proceedings (OSTI)

The Pulverizer Maintenance Guide, Volume 3: Ball/Tube Mills provides fossil plant personnel with current maintenance information on ball/tube mills from different manufacturers. This guide will assist a plant in improving the maintenance of their pulverizer mills.

2006-03-31T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Nuclear Maintenance Applications Center: Main Feedwater Pump Maintenance Guide  

Science Conference Proceedings (OSTI)

Loss of a main feedwater pump can have severe economic impact on a nuclear utility. The majority of forced outages or power reductions are believed to be attributed to nondesign issues. Case leaks, excessive vibration, seal leaks, and lubrication system problems are shown to significantly impact feedwater pump availability. Improved maintenance practices and increased attention to these issues are critical for realizing longevity of main feedwater ...

2012-11-14T23:59:59.000Z

142

Microsoft Word - maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System Maintenance Checklist System Maintenance Checklist The following checklist is intended to provide system owners, project managers and other information system developers and maintainers with guidance in identifying and planning system maintenance activities. The objectives of system maintenance are summarized as: C Resolution of errors, faults, and failures. C The requirements for system maintenance initiates lifecycle changes. The change is remapped and executed, thereby treating the maintenance process as iterations of development. Rev: 09/02 1 Maintenance Checklist SEM Reference Comments " A procedure exists for handling emergency changes that cannot be implemented as part of a scheduled release. Chapter 10 Maintenance " An identification number is assigned to the modification.

143

Cylinder Surveillance and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Surveillance and Maintenance Cylinder Surveillance and Maintenance DOE has a Cylinder Management program in place to inspect and maintain depleted UF6 cylinders, and to improve...

144

River-Forced Estuarine Plumes  

Science Conference Proceedings (OSTI)

The development, maintenance, and dissipation of river-forced estuarine plumes with and without seaward sloping bottom are studied by use of a three-dimensional, primitive-equation model. Inside the estuary, discussion is focused on how the ...

Shenn-Yu Chao

1988-01-01T23:59:59.000Z

145

Predictive model for the determination of the economic feasibility of construction and demolition waste recycling in the Air Force. Master's thesis  

Science Conference Proceedings (OSTI)

This study created a model to be used at a CONUS Air Force base to determine the economic feasibility of Construction and Demolition (CD) waste recycling. Three areas investigated to develop this model: the methods to determine amounts and types of CD waste generated at a specific location, the markets for recycled CD wastes, and the recycling methods currently available. From this data, gathered through records searches and interviews, a procedure was developed to perform cost/benefit analyses on the available recycling options. A model was then created based on these calculations which can arm a manager with information to either support or reject a recycling program by indicating cost savings or losses from recycling CD waste. Also, the model aids managers in determining the approximate quantities of recyclable materials being generated, which could be valuable in reaching base recycling goals. To demonstrate the model, the feasibility of recycling CD waste at Hill AFB, Utah in 1994 was evaluated. In addition to determining recycling feasibility, a method was presented to perform sensitivity analyses on the base-specific input variables. This procedure can help determine when it will become feasible to create a CD waste recycling program.

Dixon, B.L.

1993-09-01T23:59:59.000Z

146

Facilities Maintenance Guide  

Science Conference Proceedings (OSTI)

The subject of facilities maintenance is very broad and is commonly interpreted quite differently among maintenance managers at power plants and U.S. Department of Energy (DOE) nuclear and process facilities. In many cases, the maintenance of administrative buildings, support structures, and "real property" is managed separately from the maintenance of process equipment. The scope and breadth of each maintenance program varies from site to site, as does the formality of the program established to address...

2004-09-16T23:59:59.000Z

147

Ash Handling System Maintenance Guide  

Science Conference Proceedings (OSTI)

This Ash Handling System Maintenance Guide provides fossil plant maintenance personnel with current maintenance information on this system. This guide will assist plant maintenance personnel in improving the reliability and reducing the maintenance costs for the ash handling system.

2005-12-23T23:59:59.000Z

148

Maintaining Your Air Conditioner | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintaining Your Air Conditioner Maintaining Your Air Conditioner Maintaining Your Air Conditioner June 18, 2013 - 6:20pm Addthis Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. What does this mean for me? Regular maintenance keeps your air conditioner running as efficiently as possible. Maintaining your air conditioner will save you money by extending the unit's life. An air conditioner's filters, coils, and fins require regular maintenance for the unit to function effectively and efficiently throughout its years of service. Neglecting necessary maintenance ensures a steady decline in air conditioning performance while energy use steadily increases.

149

Maintaining Your Air Conditioner | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintaining Your Air Conditioner Maintaining Your Air Conditioner Maintaining Your Air Conditioner June 18, 2013 - 6:20pm Addthis Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. What does this mean for me? Regular maintenance keeps your air conditioner running as efficiently as possible. Maintaining your air conditioner will save you money by extending the unit's life. An air conditioner's filters, coils, and fins require regular maintenance for the unit to function effectively and efficiently throughout its years of service. Neglecting necessary maintenance ensures a steady decline in air conditioning performance while energy use steadily increases.

150

Feedwater Heater Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides plant personnel with information on the operation, maintenance, and performance of feedwater heaters. The contents of this guide will assist plant personnel in improving feedwater heater reliability, performance, and maintenance practices.

2002-05-29T23:59:59.000Z

151

Maintenance and Veg Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Functions Infrastructure projects Interconnection OASIS OATT Reauthorization of Transmission Line Permits, Maintenance and Vegetation Management on Forest Service Lands...

152

Sootblowing Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information concerning good maintenance practices, condition monitoring, predictive and preventive techniques, probable failure modes, and troubleshooting guidance to personnel involved in the maintenance of sootblowing systems and their components. This guide was developed to provide basic information as well as detailed maintenance and troubleshooting information.

2001-12-20T23:59:59.000Z

153

Night air cargo operations flyover noise mitigation by a municipality  

Science Conference Proceedings (OSTI)

A 1981 Air Force Draft Environmental ImpactAnalysis (DEIA) on converting Rickenbacker Air National Guard Base (RANGB

Angelo J. Campanella

1985-01-01T23:59:59.000Z

154

Guidelines on the Effects of Cycling Operation on Maintenance Activities  

Science Conference Proceedings (OSTI)

Cyclic operation can result in an increase in forced outage rates, higher operation and maintenance (O&M) costs, and further wear and tear on components due to additional overhauls and maintenance. Such operation may also increase unforeseen costs due to additional personnel training requirements and the use of more sophisticated evaluation and inspection techniques. These guidelines are intended to help plant operators and engineers assess the impact of cycling on maintenance activities and take appropr...

2001-12-10T23:59:59.000Z

155

Ecological predictive maintenance in urban fleets  

Science Conference Proceedings (OSTI)

Motor vehicles are one of the largest sources of air pollutants worldwide. Several studies had concluded that particulate matter (PM) are responsible for some respiratory, cardiovascular, lung diseases, increasing in death from heart and may cause lung ... Keywords: HMM, degradation, ecological, environmental, exploitation, maintenance, particulate emissions, pollutant emissions, predictive

Antnio Simes; Jos Torres Farinha; Incio Fonseca; Luis Ferreira

2010-02-01T23:59:59.000Z

156

Predictive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Maintenance Predictive Maintenance October 7, 2013 - 9:46am Addthis Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration. Predictive maintenance differs from preventive maintenance because maintenance is based on the condition of the machine instead of a preset schedule. This eliminates the unneeded maintenance concerns of preventive programs. Several predictive maintenance technologies are available. Federal agencies can leverage a combination of these technologies within their maintenance programs. Advantages A well-executed predictive maintenance program can almost eliminate catastrophic equipment failure because issues are identified and eliminated

157

Maintenance Effectiveness Assessment  

Science Conference Proceedings (OSTI)

Utilities want to know whether their equipment is being maintained in the most effective manner. Understanding the relationship between maintenance costs and benefits becomes even more important when established practices and schedules change. This report defines the problem of and presents a roadmap for the development of metrics for evaluating substation equipment maintenance effectiveness. A proposed suite of tools for assessing maintenance effectiveness TAME can provide a business analytics framework...

2010-12-23T23:59:59.000Z

158

Status of fusion maintenance  

SciTech Connect

Effective maintenance will be an essential ingredient in determining fusion system productivity. This level of productivity will result only after close attention is paid to the entire system as an entity and appropriate integration of the elements is made. The status of fusion maintenance is reviewed in the context of the entire system. While there are many challenging developmental tasks ahead in fusion maintenance, the required technologies are available in several high-technology industries, including nuclear fission.

Fuller, G.M.

1984-01-01T23:59:59.000Z

159

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Sheet for 2013 Nissan Leaf Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 5142013 456 Replaced right front strut NC...

160

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

3CE000672 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 6102013 7,426...

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

0DU103929 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 342013 4,876 Replaced relay assembly, engine...

162

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

6DU111078 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2192013 8,362 Changed oil - under warranty...

163

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

XBU100914 Maintenance Sheet for 2011 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 6192012 14,694 Replaced one tire and rotated...

164

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

2DU113491 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2192013 8,466 Changed oil - under warranty...

165

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

XDU104313 Maintenance Sheet for 2013 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 2182013 8,513 Changed oil - under warranty...

166

Data Base Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Database Maintenance Keys Page anyone in Site Operations Building Management (see Personnel) with your room number. If you are locked out during off-hours, contact Security on...

167

Substation Reliability Centered Maintenance  

SciTech Connect

Substation Reliability Centered Maintenance (RCM) is a technique that is used to develop maintenance plans and criteria so the operational capability of substation equipment is achieved, restored, or maintained. The objective of the RCM process is to focus attention on system equipment in a manner that leads to the formulation of an optimal maintenance plan. The RCM concept originated in the airline industry in the 1970s and has been used since 1985 to establish maintenance requirements for nuclear power plants. The RCM process is initially applied during the design and development phase of equipment or systems on the premise that reliability is a design characteristic. It is then reapplied, as necessary, during the operational phase to sustain a more optimal maintenance program based on actual field experiences. The purpose of the RCM process is to develop a maintenance program that provides desired or specified levels of operational safety and reliability at the lowest possible overall cost. The objectives are to predict or detect and correct incipient failures before they occur or before they develop into major defects, reduce the probability of failure, detect hidden problems, and improve the cost-effectiveness of the maintenance program. RCM accomplishes two basic purposes: (1) It identifies in real-time incipient equipment problems, averting potentially expensive catastrophic failures by communicating potential problems to appropriate system operators and maintenance personnel. (2) It provides decision support by recommending, identifying, and scheduling preventive maintenance. Recommendations are based on maintenance criteria, maintenance history, experience with similar equipment, real-time field data, and resource constraints. Hardware and software are used to accomplish these two purposes. The RCM system includes instrumentation that monitors critical substation equipment as well as computer software that helps analyze equipment data.

Purucker, S.L.

1992-11-01T23:59:59.000Z

168

Distribution of small dispersive coal dust particles and absorbed radioactive chemical elements in conditions of forced acoustic resonance in iodine air filter at nuclear power plant  

E-Print Network (OSTI)

The physical features of distribution of the small dispersive coal dust particles and the adsorbed radioactive chemical elements and their isotopes in the absorber with the granular filtering medium with the cylindrical coal granules were researched in the case of the intensive air dust aerosol stream flow through the iodine air filter (IAF). It was shown that, at the certain aerodynamic conditions in the IAF, the generation of the acoustic oscillations is possible. It was found that the acoustic oscillations generation results in an appearance of the standing acoustic waves of the air pressure (density) in the IAF. In the case of the intensive blow of the air dust aerosol, it was demonstrated that the standing acoustic waves have some strong influences on both: 1) the dynamics of small dispersive coal dust particles movement and their accumulation in the IAF; 2) the oversaturation of the cylindrical coal granules by the adsorbed radioactive chemical elements and their isotopes in the regions, where the antin...

Ledenyov, Oleg P

2013-01-01T23:59:59.000Z

169

Forced Boundary-Layer Transition on X-43 (Hyper-X) in NASA LaRC 31-Inch Mach 10 Air Tunnel  

Science Conference Proceedings (OSTI)

Aeroheating and boundary layer transition characteristics for the X-43 (Hyper-X) configuration have been experimentally examined in the Langley 31-Inch Mach 10 Air Tunnel. Global surface heat transfer distributions, and surface streamline patterns were ...

Berry Scott A.; DiFulvio Michael; Kowalkowski Matthew K.

2000-08-01T23:59:59.000Z

170

Forced Boundary-Layer Transition on X-43 (Hyper-X) in NASA LaRC 20-Inch Mach 6 Air Tunnel  

Science Conference Proceedings (OSTI)

Aeroheating and boundary layer transition characteristics for the X-43 (Hyper-X) configuration have been experimentally examined in the Langley 20-Inch Mach 6 Air Tunnel. Global surface heat transfer distributions, and surface streamline patterns were ...

Berry Scott A.; DiFulvio Michael; Kowalkowski Matthew K.

2000-08-01T23:59:59.000Z

171

Air Leakage of Furnaces and Air Handlers  

NLE Websites -- All DOE Office Websites (Extended Search)

Air Leakage of Furnaces and Air Handlers Air Leakage of Furnaces and Air Handlers Title Air Leakage of Furnaces and Air Handlers Publication Type Journal Article LBNL Report Number LBNL-5553E Year of Publication 2010 Authors Walker, Iain S., Mile Lubliner, Darryl J. Dickerhoff, and William W. Delp Journal 2010 ACEEE Summer Study on Energy Efficiency in Buildings The Climate for efficiency is now Date Published 08/2010 Abstract In recent years, great strides have been made in reducing air leakage in residential and to a lesser extent small commercial forced air duct systems. Several authorities have introduced low leakage limits for thermal distribution systems; for example, the State of California Energy Code for Buildings gives credit for systems that leak less than 6% of the total air flow at 25 Pa.

172

Nuclear Maintenance Applications Center: Condenser Cleaning Equipment Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides power plant maintenance personnel with current maintenance information on condenser cleaning systems. The report will help these personnel to improve the reliability and reduce the maintenance costs for the condenser cleaning equipment used in power plants.

2007-12-21T23:59:59.000Z

173

Condenser Application and Maintenance Guide  

Science Conference Proceedings (OSTI)

The Condenser Application and Maintenance Guide provides plant personnel with information on the operation, maintenance, and performance of condensers. The contents of this guide will assist plants in improving condenser performance, reducing maintenance costs, and increasing condenser reliability.

2001-08-23T23:59:59.000Z

174

Maintenance | OpenEI Community  

Open Energy Info (EERE)

Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

175

Static Seals Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides comprehensive technical information on the understanding and maintenance of static seals. It is designed to help utility staffs maintain static seals and minimize and trouble shoot leakage problems that can reduce plant availability.

1994-09-22T23:59:59.000Z

176

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

0CE002590 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 1252013 7,925 Changed oil and filter and...

177

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

7CE000612 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 1172013 6,327 Changed oil and filter and...

178

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

5CE002486 Maintenance Sheet for 2013 Honda Civic CNG Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 212013 7,892 Changed oil and filter and...

179

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

8BU100815 Maintenance Sheet for 2011 Chevrolet Volt Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 882012 17,160 Changed oil and filter and...

180

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DU2A5010462 Maintenance Sheet for 2010 Toyota Prius Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 11232009 5,935 Changed oil and filter,...

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DU5A0006063 Maintenance Sheet for 2010 Toyota Prius Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 8192009 5,090 Changed oil and filter and...

182

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DP8D3038660 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6222013 6,331 5K service -...

183

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6132013 5,220 5K service - under...

184

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

DP6D3038663 Maintenance Sheet for 2013 Toyota Prius Plug-in Hybrid Advanced Vehicle Testing Activity PHEV Fleet Testing Date Mileage Description Cost 6122013 5,078 5K service -...

185

Wind Turbine Maintenance Guide  

Science Conference Proceedings (OSTI)

This guideline provides component-level information regarding the maintenance of major components associated with a wind turbine. It combines recommendations offered by major equipment manufacturers with lessons learned from owner/operators of wind turbine facilities.

2012-06-29T23:59:59.000Z

186

Air Conditioning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conditioning Conditioning Air Conditioning July 1, 2012 - 6:28pm Addthis Air conditioners cost U.S. homeowners more than $11 billion each year, and regular maintenance can keep your air conditioner running efficiently. | Photo courtesy of ©iStockphoto/JaniceRichard Air conditioners cost U.S. homeowners more than $11 billion each year, and regular maintenance can keep your air conditioner running efficiently. | Photo courtesy of ©iStockphoto/JaniceRichard How does it work? An air conditioner uses energy -- usually electricity -- to transfer heat from the interior of your home to the relatively warm outside environment. Two-thirds of all homes in the United States have air conditioners. Air conditioners use about 5% of all the electricity produced in the United States, at an annual cost of more than $11 billion to homeowners. As a

187

Proactive maintenance initiatives at Argonne National Laboratory-West  

SciTech Connect

In the late 1980`s, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ``mentor`` roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I&C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned.

Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

1995-06-01T23:59:59.000Z

188

Distribution of small dispersive coal dust particles and absorbed radioactive chemical elements in conditions of forced acoustic resonance in iodine air filter at nuclear power plant  

E-Print Network (OSTI)

The physical features of distribution of the small dispersive coal dust particles and the adsorbed radioactive chemical elements and their isotopes in the absorber with the granular filtering medium with the cylindrical coal granules were researched in the case of the intensive air dust aerosol stream flow through the iodine air filter (IAF). It was shown that, at the certain aerodynamic conditions in the IAF, the generation of the acoustic oscillations is possible. It was found that the acoustic oscillations generation results in an appearance of the standing acoustic waves of the air pressure (density) in the IAF. In the case of the intensive blow of the air dust aerosol, it was demonstrated that the standing acoustic waves have some strong influences on both: 1) the dynamics of small dispersive coal dust particles movement and their accumulation in the IAF; 2) the oversaturation of the cylindrical coal granules by the adsorbed radioactive chemical elements and their isotopes in the regions, where the antinodes of the acoustic waves are positioned. Finally, we completed the comparative analysis of the theoretical calculations with the experimental results, obtained for the cases of: 1) the experimental aerodynamic modeling of physical processes of the absorbed radioactive chemical elements and their isotopes distribution in the IAF; and 2) the gamma-activation spectroscopy analysis of the absorbed radioactive chemical elements and their isotopes distribution in the IAF. We made the innovative propositions on the necessary technical modifications with the purpose to improve the IAF technical characteristics and increase its operational time at the nuclear power plant (NPP), going from the completed precise characterization of the IAF parameters at the long term operation.

Oleg P. Ledenyov; Ivan M. Neklyudov

2013-06-14T23:59:59.000Z

189

HVAC Fans and Dampers Maintenance Guide  

Science Conference Proceedings (OSTI)

Heating, ventilation, and air conditioning (HVAC) systems serve an important function in nuclear power plants because these systems are responsible for maintaining many environmental conditions throughout the facility. Failure of these components can induce undesirable radiological conditions and stressful working conditions, and can compromise the life of qualified equipment. Some HVAC fan and damper failures are preventable by monitoring operating parameters and performing recommended maintenance activ...

1999-08-26T23:59:59.000Z

190

Nuclear Maintenance Applications Center: Feed Pump Turbine Maintenance Guide  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Steam Turbines and Auxiliaries Program 65 and the Nuclear Maintenance Application Center have developed a series of maintenance guides to assist plant personnel with the performance of various maintenance tasks associated with a wide variety of plant components. The objective of this project was to publish a maintenance guide for the feed pump turbines that included an ...

2012-09-25T23:59:59.000Z

191

Comparing maintenance costs of geothermal heat pump systems with other HVAC systems: Preventive maintenance actions and total maintenance costs  

SciTech Connect

Total annual heating, ventilating, and air-conditioning (HVAC) maintenance costs were determined for 20 schools in the Lincoln, Nebraska, Public School District. Each school examined provides cooling to over 70% of its total floor area and relies on one of the following heating and cooling systems to provide the majority of space conditioning: vertical-bore, geothermal heat pumps (GHPs), air-cooled chiller with gas-fired hot water boiler (ACC/GHWB), or water-cooled chiller with gas-fired steam boiler (WCC/GSB). A precursor to this study examined annual costs associated with repair, service, and corrective maintenance activities tracked in a work order database. This follow-up study examines costs associated with preventive maintenance (PM) activities conducted by the district. Annual PM costs were 5.87 {cents}/yr-ft{sup 2} (63.14 {cents}/yr-m{sup 2}) for ACC/GHWB schools, followed by 7.14 {cents}/yr-ft{sup 2} (76.86 {cents}/yr-m{sup 2}) for GHP, 9.82 {cents}/yr-ft{sup 2} (105.39 {cents}/yr-m{sup 2}) for WCC/ GSB, and 12.65 {cents}/yr-ft{sup 2} (136.30 {cents}/yr-m{sup 2}) for WCC/GHWB. The results of the two analyses are combined to produce an estimate of total annual maintenance costs, by system type, for the 20 schools. Total annual maintenance costs were 8.75 {cents}/yr-ft{sup 2} (94.20 {cents}/yr-m{sup 2}) for ACC/GHWB schools, followed by 9.27 {cents}/yr-ft{sup 2} (99.76 {cents}/yr-m{sup 2}) for GHP, 13.54 {cents}/yr-ft{sup 2} (145.49 {cents}/yr-m{sup 2}) for WCC/GSB, and 18.71 {cents}/yr-ft{sup 2} (201.61 {cents}/yr-m{sup 2}) for WCC/GHWB. It should be noted that these costs represent only the trends seen in the maintenance database of the Lincoln School District. Because of differences in the number of schools using each system type, varying equipment age, and the small total number of schools included in the study, the maintenance costs presented here may not be representative of the maintenance costs seen for similar equipment in other locations.

Martin, M.A.; Madgett, M.G.; Hughes, P.J.

2000-07-01T23:59:59.000Z

192

Equipment Maintenance Optimization Manual Prototypes  

Science Conference Proceedings (OSTI)

This report provides detailed information to assist plant staff in performing recommended equipment maintenance tasks. It is a compilation of equipment maintenance optimization manual (EMOM) prototypes that include procedures and trouble shooting supported by broad-based utility experience. The EMOMs enable utility generation stations to: minimize operation and maintenance costs, including parts and labor; assist in maintenance planning, scheduling, and parts strategy; develop comprehensive maintenance m...

1999-11-24T23:59:59.000Z

193

Maintenance simulation: Software issues  

SciTech Connect

The maintenance of a distributed software system in a production environment involves: (1) maintaining software integrity, (2) maintaining and database integrity, (3) adding new features, and (4) adding new systems. These issues will be discussed in general: what they are and how they are handled. This paper will present our experience with a distributed resource management system that accounts for resources consumed, in real-time, on a network of heterogenous computers. The simulated environments to maintain this system will be presented relate to the four maintenance areas.

Luk, C.H.; Jette, M.A.

1995-07-01T23:59:59.000Z

194

Nuclear forces  

Science Conference Proceedings (OSTI)

These lectures present an introduction into the theory of nuclear forces. We focus mainly on the modern approach

2013-01-01T23:59:59.000Z

195

Geothermal Energy Development in the Eastern United States: Technical assistance report No. 6 geothermal space heating and airconditioning -- McGuire Air Force Base, New Jersey  

DOE Green Energy (OSTI)

A method of utilizing the geothermal (66 F) water resource for space heating and cooling of 200 of the 1452 housing units at McGuire AFB is suggested. Using projections of future costs of gas, coal and electricity made by DOD and by industry (Westinghouse), the relative costs of the geothermal-water-plus-heat-pump system and the otherwise-planned central gas heating (to be converted to coal in 1984) and air-conditioning (using individual electric units) system are compared. For heating with the geothermal/heat-pump system, an outlet temperature of 130 F is selected, requiring a longer running time than the conventional system (at 180 F) but permitting a COP (coefficient of performance) of the heat pump of about 3.4. For cooling (obtained in this study by changing directions of water flow, not refrigerant cycles), the change in temperature is less, and a COP near 4.5 is obtained. The cost of cooling in the summer months would be significantly less than the cost of using individual electric air-conditioners. Thus, by using nonreversible heat pumps, geothermal water is used to heat and to cool a section of the housing compound, minimizing operating expenditures. It is estimated that, to drill 1000 ft deep production and reinjection wells and to install ten heat pumps, heat exchangers and piping, would require a capital outlay of $643 K. This cost would replace the capital cost of purchasing and installing 200 air-conditioning units and 14% of the cost of the future coal-fired central heating system (which would otherwise serve all 1452 housing units at McGuire). The net additional capital outlay would be $299 K, which could be amortized in 10 years by the lower operating cost of the geothermal system if electricity and coal prices escalate as industry suggests. If the coal and electricity costs rise at the more modest rates that DOD projects, the capital costs would be amortized in a 15 year period.

Hill, F.K.; Briesen R. von

1980-12-01T23:59:59.000Z

196

FMAC: Coal-Handling Maintenance Guide  

Science Conference Proceedings (OSTI)

The Coal Handling System Maintenance Guide provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs for the coal handling system.

2006-12-22T23:59:59.000Z

197

Predictive Maintenance Assessment Guidelines  

Science Conference Proceedings (OSTI)

This document is the third in a series of guidelines designed to help electric power utilities develop programs that take advantage of diagnostic technologies used to detect problems in machinery. The PDM Assessment Guidelines provide the procedures necessary to plan and implement a plant wide predictive maintenance program.

1997-12-02T23:59:59.000Z

198

CH Packaging Maintenance Manual  

SciTech Connect

This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests.

Washington TRU Solutions

2002-01-02T23:59:59.000Z

199

Lawn Maintenance Safety  

E-Print Network (OSTI)

Most homeowners do not consider lawn maintenance to be dangerous. However lawn mowers, trimmers, edgers and other power equipment can cause minor to severe burns and lacerations, broken and dislocated bones, eye injuries and loss of fingers, toes and legs. You can avoid accidents like these by following the safety guidelines in this publication.

Smith, David

2005-07-12T23:59:59.000Z

200

Preventive Maintenance Programs  

Science Conference Proceedings (OSTI)

...and specifications Operator, service, and repair manuals Lubricant type Filter specifications Wear components, especially material survey data Prior service and maintenance reports to identify problem Establish sampling and sample handling procedures Design and document sampling methods, such as in-live...

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Web Recency Maintenance Protocol  

Science Conference Proceedings (OSTI)

In this paper, we propose a new protocol namely Web Recency Maintenance Protocol (WRMP) that employs "push" mechanism to maintain the currency of the World Wide Web (WWW) at Search Engine (SE) site. As of this writing SEs are adopting "pull" technology, ...

K. Satya Sai Prakash; S. V. Raghavan

2002-12-01T23:59:59.000Z

202

Operations & Maintenance Best Practices Guide: Release 3.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Why O&M? 2 Why O&M? � 2.1 Introduction Effective O&M is one of the most cost-effective methods for ensuring reliability, safety, and energy efficiency. Inadequate maintenance of energy-using systems is a major cause of energy waste in both the Federal Government and the private sector. Energy losses from steam, water and air leaks, uninsulated lines, maladjusted or inoperable controls, and other losses from poor maintenance are often considerable. Good maintenance practices can generate substantial energy savings and should be considered a resource. Moreover, improvements to facility maintenance programs can often be accomplished immediately and at a relatively low cost. 2.2 Definitions Operations and Maintenance are the decisions and actions regarding the control and upkeep of

203

Maintenance Work Management -- Best Practices Guidelines: Maintenance Assessment and Improvement  

Science Conference Proceedings (OSTI)

This report on maintenance work management best practices is part of EPRI's Plant Maintenance Optimization (PMO) development efforts. Based on a series of assessment and improvement projects, the report describes the process and typical results.

1998-03-12T23:59:59.000Z

204

Nuclear Maintenance Applications Center: Heat Exchanger Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides plant personnel with information on the operation, maintenance, and performance of heat exchangers. The contents of this guide will assist plant personnel in improving heat exchanger reliability, performance, and maintenance practices.

2009-06-14T23:59:59.000Z

205

USE OF THE DRY MAINTENANCE FACILITY FOR HRT MAINTENANCE  

SciTech Connect

A portable shield was utilized in performing nine semidirect dry maintenance jobs on the HRT. The shield proved to be completely reliable, affording a considerable savings in maintenance costs and reactor downtime. (auth)

Jarvis, J.P.

1962-09-17T23:59:59.000Z

206

Multi-stage combustion using nitrogen-enriched air - Energy ...  

Multi-stage combustion technology combined with nitrogen-enriched air technology for controlling the combustion temperature and products to extend the maintenance and ...

207

Computerized Maintenance Management System and Maintenance Work Process Integration  

Science Conference Proceedings (OSTI)

A Computerized Maintenance Management System (CMMS) is an information and communication tool supporting the maintenance work process within an industrial plant. Though these types of systems are found in various industries, no report has existed describing CMMS integration within a utility environment. This guideline describes how to integrate a CMMS with the methods, procedures, work processes, and overall maintenance in a power plant.

1998-04-29T23:59:59.000Z

208

care and maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Care and Maintenance of the Prairie Parcel Care and Maintenance of the Prairie Parcel Now that your prairie parcel is up and growing, there are just a few concerns that you should consider about its care. Weeding The question of weeding is really just a matter of aesthetics. You do not have to weed your parcel. If your parcel is a large one, weeding may not even be practical. Although the "weed" species will dominate your parcel for the first few years, they will give way to the native plant species. You can liken the native plants to long distance runners; they appear to start off slowly, but end up winning the ecological race. After all, they are the plants that are genetically-suited and adapted to growing in this environment. The native prairie plants will be developing extensive root structure the

209

HVAC Maintenance and Technologies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC - HVAC - Maintenance and Technologies Federal Utility Partnership Working Group Meeting Providence, Rhode Island April 15, 2010 BY Ramin Faramarzi, P.E. Technology Test Centers (TTC) Design and Engineering Services Southern California Edison (SCE) www.sce.com/rttc 2 Outline * Introduction to SCE's TTC * Overview of energy challenges in California (CA) * Role of HVAC in CA's energy and demand equations * Factors affecting HVAC performance * Focus on SCE's research on maintenance faults * Next generation of HVAC equipment * HVAC technologies on SCE's TTC radar * Black boxes - do they all work? 3 SCE's Technology Test Centers * SCE applied research facilities located in Irwindale, CA comprised of 3 test beds: * Refrigeration * HVAC * Lighting * Coming Soon! - A new ZNE lab 4 Refrigeration Testing

210

Terminal automation system maintenance  

SciTech Connect

Nothing has improved petroleum product loading in recent years more than terminal automation systems. The presence of terminal automation systems (TAS) at loading racks has increased operational efficiency and safety and enhanced their accounting and management capabilities. However, like all finite systems, they occasionally malfunction or fail. Proper servicing and maintenance can minimize this. And in the unlikely event a TAS breakdown does occur, prompt and effective troubleshooting can reduce its impact on terminal productivity. To accommodate around-the-clock loading at racks, increasingly unattended by terminal personnel, TAS maintenance, servicing and troubleshooting has become increasingly demanding. It has also become increasingly important. After 15 years of trial and error at petroleum and petrochemical storage and transfer terminals, a number of successful troubleshooting programs have been developed. These include 24-hour {open_quotes}help hotlines,{close_quotes} internal (terminal company) and external (supplier) support staff, and {open_quotes}layered{close_quotes} support. These programs are described.

Coffelt, D.; Hewitt, J. [Engineered Systems Inc., Tempe, AZ (United States)

1997-01-01T23:59:59.000Z

211

Preventive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preventive Maintenance Preventive Maintenance Preventive Maintenance October 7, 2013 - 9:44am Addthis Preventive maintenance aims to sustain or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time. Advantages Federal agencies can greatly extend equipment reliability and lifespan by expending the necessary resources for regular maintenance. In most cases, the system designer or manufacturer outlines regular maintenance under a preventive strategy. In addition to increased reliability and lifespan, budget is saved over the life of the system. Preventive maintenance programs can save as much as 12% to 18% in equipment repair and replacement. Other advantages of preventitive maintenance are:

212

Reactive Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reactive Maintenance Reactive Maintenance Reactive Maintenance October 7, 2013 - 9:40am Addthis Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities. Advantages Reactive maintenance advantages are a double-edged sword. Federal agencies following a purely reactive maintenance strategy can expect little expenditures for manpower or system upkeep until something breaks. However, systems do break. With new equipment, Federal agencies can expect minimal incidents of failure. However, older equipment often experiences higher failure incidents and costlier repairs. Other advantages of reactive maintenance are:

213

Maintenance FUSION IGNITION RESEARCH EXPERIMENT  

E-Print Network (OSTI)

to refine the system details, interfaces and the requirements for remote handling. Table 1. FIRE RadialInsulation Enclosure Remote Maintenance Module FUSION IGNITION RESEARCH EXPERIMENT SYSTEM objectives and subsystem requirements in an arrangement that allows remote maintenance of in

214

Industrial Compressed Air System Energy Efficiency Guidebook.  

DOE Green Energy (OSTI)

Energy efficient design, operation and maintenance of compressed air systems in industrial plants can provide substantial reductions in electric power and other operational costs. This guidebook will help identify cost effective, energy efficiency opportunities in compressed air system design, re-design, operation and maintenance. The guidebook provides: (1) a broad overview of industrial compressed air systems, (2) methods for estimating compressed air consumption and projected air savings, (3) a description of applicable, generic energy conservation measures, and, (4) a review of some compressed air system demonstration projects that have taken place over the last two years. The primary audience for this guidebook includes plant maintenance supervisors, plant engineers, plant managers and others interested in energy management of industrial compressed air systems.

United States. Bonneville Power Administration.

1993-12-01T23:59:59.000Z

215

Main Generator Rotor Maintenance  

Science Conference Proceedings (OSTI)

Main generator rotors are constructed and designed to provide decades of reliable and trouble-free operation. However, a number of incidences have occurred over the years that can adversely impact reliable operation of generator rotors and, ultimately, production of electrical power. This report is a guide for power plant personnel responsible for reliable operation and maintenance of main generators. As a guide, this report provides knowledge and experience from generator experts working at power plants...

2006-11-27T23:59:59.000Z

216

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

Changed oil and filter and rotated tires 80.39 12232010 63,323 Replaced AC blower motor 266.54 1202011 68,406 Changed oil and filter and replaced air filter 81.66 225...

217

Electric Motor Tiered Maintenance Program  

Science Conference Proceedings (OSTI)

Electric motor predictive and preventive maintenance guidance has been developed to provide information to help maximize motor reliability and to minimize the need for major motor repairs. However, if all recommendations presented in most guides are followed and applied to all motors, the cost of motor maintenance would be unwieldy and consume more than its share of maintenance budgets.

2002-08-27T23:59:59.000Z

218

Bottom Ash System Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to personnel involved in the bottom ash system and its components, including good maintenance practices, condition monitoring, predictive and preventive maintenance techniques, probable failure modes, and troubleshooting guidance. The guide was developed primarily to provide detailed maintenance and troubleshooting information but also includes basic system information.

2000-10-31T23:59:59.000Z

219

Predictive Maintenance Program Implementation Experience  

Science Conference Proceedings (OSTI)

Predictive maintenance (PDM) is a process of collecting data, assessing machinery condition, and deciding when to perform maintenance. PDM saves money and improves machinery reliability as compared to preventive or corrective maintenance. This report describes the implementation of PDM programs at Commonwealth Edison's (ComEd's) fossil power plants.

1998-12-29T23:59:59.000Z

220

Design of a maintenance and operations recommender  

E-Print Network (OSTI)

from computerized maintenance management systems (CMMS)use computerized maintenance management systems (CMMS) andmanagement and control systems (EMCS) to recom- mend what maintenance

Federspiel, C.; Villafana, L.

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

HVAC Maintenance and Technologies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC Maintenance and Technologies HVAC Maintenance and Technologies Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility...

222

Spring Home Maintenance: Windows, Windows, Windows! | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Spring Home Maintenance: Windows, Windows, Windows! Spring Home Maintenance: Windows, Windows, Windows! Spring Home Maintenance: Windows, Windows, Windows! April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air leakage around your windows. | Photo courtesy of ©iStockphoto.com/BanksPhotos Caulking is an easy way to reduce air leakage around your windows. | Photo courtesy of ©iStockphoto.com/BanksPhotos Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Use these tips for window maintence and treatments to save energy this spring. The beginning of spring marks the point in the year when I'm cleaning, purging the house of things I no longer need, and updating my home on needed repairs. This year, I'm focusing on how to lower my energy bills

223

Spring Home Maintenance: Windows, Windows, Windows! | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Home Maintenance: Windows, Windows, Windows! Home Maintenance: Windows, Windows, Windows! Spring Home Maintenance: Windows, Windows, Windows! April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air leakage around your windows. | Photo courtesy of ©iStockphoto.com/BanksPhotos Caulking is an easy way to reduce air leakage around your windows. | Photo courtesy of ©iStockphoto.com/BanksPhotos Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Use these tips for window maintence and treatments to save energy this spring. The beginning of spring marks the point in the year when I'm cleaning, purging the house of things I no longer need, and updating my home on needed repairs. This year, I'm focusing on how to lower my energy bills

224

Maintenance of the stratospheric structure in an idealized general circulation model  

Science Conference Proceedings (OSTI)

We explore the maintenance of the stratospheric structure in a primitive equation model that is forced by a Newtonian cooling with a prescribed radiative equilibrium temperature field. Models such as this are well suited to analyze and address ...

M. Jucker; S. Fueglistaler; G. K. Vallis

225

Opportune maintenance and predictive maintenance decision support douard Thomas, ric Levrat, Benoit Iung, Pierre Cocheteux  

E-Print Network (OSTI)

to several ones. Keywords: Predictive maintenance, Maintenance engineering, Decision making, Complex systems be answered by using maintenance engineering, and more specifically a computerised maintenance management system that collects the information related to the different maintenance actions. Finally the second

Paris-Sud XI, Université de

226

Federal Energy Management Program: Maintenance Types  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Types Maintenance Types to someone by E-mail Share Federal Energy Management Program: Maintenance Types on Facebook Tweet about Federal Energy Management Program: Maintenance Types on Twitter Bookmark Federal Energy Management Program: Maintenance Types on Google Bookmark Federal Energy Management Program: Maintenance Types on Delicious Rank Federal Energy Management Program: Maintenance Types on Digg Find More places to share Federal Energy Management Program: Maintenance Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources Contacts

227

Software maintenance maturity model (smmm): the software maintenance process model  

E-Print Network (OSTI)

This paper summarizes the research work leading to a Phd thesis that addresses the assessment and improvement of the software maintenance function by proposing a maturity model for daily software maintenance activities: Software Maintenance Maturity Model (SM mm) as well as its supporting knowledge based system SM Xpert. The software maintenance function suffers from a scarcity of management models to facilitate its evaluation, management, and continuous improvement. The SM mm addresses the unique activities of software maintenance while preserving a structure similar to that of the CMMi 1 maturity model. It is designed to be used as a complement to this model. The SM mm is based on practitioners experience, international standards, and the seminal literature on software maintenance. This paper presents the models purpose, scope, foundation, and architecture, followed by a knowledgebased system to help software maintainers learn and use the maturity model. 1.

Alain April; Jean-marc Desharnais

2005-01-01T23:59:59.000Z

228

Gas Turbine Technology, Part B: Components, Operations and Maintenance  

E-Print Network (OSTI)

This paper builds on Part A and discusses the hardware involved in gas turbines as well as operations and maintenance aspects pertinent to cogeneration plants. Different categories of gas turbines are reviewed such as heavy duty aeroderivative, single and split shaft. The pros and cons of different types are reviewed. Gas turbine component types - axial and centrifugal compressors and different turbine types, along with combustor types will be discussed. Important considerations during machine specifications are also reviewed. Practical aspects such as coatings, materials, fuel handling and auxiliary systems will also be highlighted. Operations and maintenance aspects including Preventative Maintenance, Repairs, Fuel and Air Filtration, Compressor Washing and Reliability is discussed. Typical operating and maintenance costs are provided. This paper presents an extensive bibliography to enable readers to follow up any topic in detail.

Meher-Homji, C. B.; Focke, A. B.

1985-05-01T23:59:59.000Z

229

Generation Maintenance Applications Center: Conventional Vertical Pump Maintenance Guide  

Science Conference Proceedings (OSTI)

Vertical pumps are used in several applications in power plants, such as condensate, heater drain, circulating water, and service water/river water applications.BackgroundThe Maintenance Issue Surveys of the Electric Power Research Institute (EPRI) Generation Maintenance Applications Center (GenMAC) indicate that members are experiencing difficulties with various maintenance issues associated with vertical pumps. Some of the problems identified a need for ...

2013-12-19T23:59:59.000Z

230

Nuclear Maintenance Applications Center: Isolated Phase Bus Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides information on design, operating experience, and maintenance practices associated with the isophase bus system. The information is meant to be useful for system engineers, component engineers, maintenance personnel, and their supervision in understanding and maintaining this system. This document is an update to Isolated Phase Bus Maintenance Guide (EPRI report TR-112784), and the scope has been expanded to include boundary components, such as potential transformers (PTs) and current...

2007-12-20T23:59:59.000Z

231

Evaluating maintenance policies by quantitative modeling and analysis Enrico Zio1,2,*  

E-Print Network (OSTI)

. It is shown that modeling and analysis provide information useful for setting a maintenance policy. 1 of the energy market, which has forced the producers to be more competitive by reacting promptly and reliablyEvaluating maintenance policies by quantitative modeling and analysis Enrico Zio1,2,* , Michele

Paris-Sud XI, Université de

232

Using Force  

E-Print Network (OSTI)

7. 1981. upon the Iraqi Nuclear Reactor: Aggression or Self-air strike on the Osirak nuclear reactor in Iraq. Israelposed by an Iraqi nuclear reactor before it had become

Yoo, John C.

2004-01-01T23:59:59.000Z

233

Management Applications of Maintenance Reports  

E-Print Network (OSTI)

The good computerized maintenance management systems available today provide Plant Engineers with sufficient data to institute policies and procedures to materially affect the company profits. Regrettably, the vast majority of these Engineers and their Maintenance Managers seem content to simply produce PM work orders, maintenance equipment repair histories and generate a few activity reports. A straightforward and practical application of the available cost and performance data enables maintenance management to constantly fine tune operational procedures to minimize cost and equipment failure from the available data. Using this data, the manager can easily measure the total effect of maintenance on his company's overall performance. The practical application of this data to reduce overall maintenance cost and to increase equipment availability is discussed in this paper.

Gehl, P.

1993-03-01T23:59:59.000Z

234

Equipment Maintenance Optimization Manual Applications  

Science Conference Proceedings (OSTI)

This report is a compilation of Equipment Maintenance Optimization Manuals (EMOMs) that include procedures and troubleshooting supported by broad-based utility experience. EMOMs for critical generating station equipment allows power generating plants to replace existing maintenance practices with the latest industry best practices. Using this information as a benchmark, current practices can be validated or adjusted for more optimum performance of the overall maintenance process. In addition, the EMOMs c...

2001-12-21T23:59:59.000Z

235

Mechanical Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

236

Sustainability of green space maintenance  

E-Print Network (OSTI)

In Japan, recent changes in socio-economic and political structures -- decreasing tax revenue, declining communication among community members, and privatization of public services-- have influenced existing maintenance ...

Nomura, Wataru

2011-01-01T23:59:59.000Z

237

Reliability-Centered Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability-Centered Maintenance Reliability-Centered Maintenance Reliability-Centered Maintenance October 7, 2013 - 9:48am Addthis Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance. The difference is that reliability-centered maintenance recognizes that: Equipment design and operations differ Different equipment has different probabilities of failure All equipment is not of equal importance to facility operations Facilities have limited financial and personnel resources. While reliability-centered maintenance relies on predictive maintenance practices and technologies, it also recognizes that maintenance on inexpensive and/or unimportant equipment may be better served by a reactive or predictive maintenance approach. Each of the aforementioned factors are

238

Federal Energy Management Program: Reactive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Reactive Reactive Maintenance to someone by E-mail Share Federal Energy Management Program: Reactive Maintenance on Facebook Tweet about Federal Energy Management Program: Reactive Maintenance on Twitter Bookmark Federal Energy Management Program: Reactive Maintenance on Google Bookmark Federal Energy Management Program: Reactive Maintenance on Delicious Rank Federal Energy Management Program: Reactive Maintenance on Digg Find More places to share Federal Energy Management Program: Reactive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

239

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance on Google Bookmark Federal Energy Management Program: Operations and Maintenance on Delicious Rank Federal Energy Management Program: Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources

240

Federal Energy Management Program: Preventive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Preventive Preventive Maintenance to someone by E-mail Share Federal Energy Management Program: Preventive Maintenance on Facebook Tweet about Federal Energy Management Program: Preventive Maintenance on Twitter Bookmark Federal Energy Management Program: Preventive Maintenance on Google Bookmark Federal Energy Management Program: Preventive Maintenance on Delicious Rank Federal Energy Management Program: Preventive Maintenance on Digg Find More places to share Federal Energy Management Program: Preventive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Nuclear Maintenance Applications Center: Reactor Recirculation Pump Seal Maintenance Guide  

Science Conference Proceedings (OSTI)

In 1993, the Electric Power Research Institute (EPRI) published Main Coolant Pump Seal Maintenance Guide (report TR-100855). That report provides guidance on maintenance and troubleshooting of main coolant pump seals but was generic in naturethe information was relevant to pressurized water reactors (PWRs) and boiling water reactors (BWRs).

2008-12-18T23:59:59.000Z

242

Nuclear Maintenance Applications Center: Emergency Diesel Generator Condition- Based Maintenance  

Science Conference Proceedings (OSTI)

Condition-based maintenance practices that were developed in the United States in the 1990s for emergency diesel generators (EDGs) have not been fully adopted by international nuclear plant operators. To encourage broader use of such practices, NMAC formed a technical advisory group of international utilities interested in learning more about condition-based EDG maintenance practices.

2008-12-19T23:59:59.000Z

243

Nuclear Maintenance Application Center: Characterizing International Maintenance Practices  

Science Conference Proceedings (OSTI)

In 1987, the Electric Power Research Institute (EPRI) published report NP-5185-SR, Maintenance of European Nuclear Power Plants. The project comprised visits to six plant sites in six European countries over a two-week period and reported on the state of the various maintenance processes and programs in use at each location.

2012-08-07T23:59:59.000Z

244

U.S.Air Force Advanced Power  

E-Print Network (OSTI)

Tractor · Robins AFB H2 Fuel Cell Forklift/Toolcat · Fisher-Tropsch Synthetic FuelTest · Robins E-85 Effort · Solar such as ethanol (E10,E85),biodiesel (B20) and Synthetic fuel (Fisher-Tropsch) will enhance capabilities while

245

The Army Air Forces NEPA Project  

SciTech Connect

Included herein is a historical record of the AAF sponsored NEPA Project during the period of October 1945, to the present time, and covers in narrative form the nature of planning leading to the implementation of the project, the establishment of the operating group and its relationship to the Manhattan District (later to become the Atomic Energy Commission) and the approach to applicable technological problems bearing on both nuclear science and aeronautical propulsion engineering aspects.

Gasser, C.D.

1947-05-30T23:59:59.000Z

246

AIR FORCE APPROACH TO TOXICOLOGY OF HALON ...  

Science Conference Proceedings (OSTI)

... including a thorough investigation of historical tumor data in naive rats and ... and [4-chloro-6-(2,3-xylidino)-2- py~imidinylthio]acetic acid (Wy-14,643 ...

2011-10-18T23:59:59.000Z

247

Common Air Conditioner Problems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Common Air Conditioner Problems Common Air Conditioner Problems Common Air Conditioner Problems May 30, 2012 - 6:41pm Addthis A refrigerant leak is one common air conditioning problem. | Photo courtesy of ©iStockphoto/BanksPhotos. A refrigerant leak is one common air conditioning problem. | Photo courtesy of ©iStockphoto/BanksPhotos. What does this mean for me? You can eliminate the most common air conditioner problems before hiring an air conditioning technician. You can do some air conditioner maintenance and repair tasks yourself. One of the most common air conditioning problems is improper operation. If your air conditioner is on, be sure to close your home's windows and outside doors. For room air conditioners, isolate the room or a group of connected rooms as much as possible from the rest of your home.

248

Common Air Conditioner Problems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Common Air Conditioner Problems Common Air Conditioner Problems Common Air Conditioner Problems May 30, 2012 - 6:41pm Addthis A refrigerant leak is one common air conditioning problem. | Photo courtesy of ©iStockphoto/BanksPhotos. A refrigerant leak is one common air conditioning problem. | Photo courtesy of ©iStockphoto/BanksPhotos. What does this mean for me? You can eliminate the most common air conditioner problems before hiring an air conditioning technician. You can do some air conditioner maintenance and repair tasks yourself. One of the most common air conditioning problems is improper operation. If your air conditioner is on, be sure to close your home's windows and outside doors. For room air conditioners, isolate the room or a group of connected rooms as much as possible from the rest of your home.

249

Achieving world class maintenance status  

Science Conference Proceedings (OSTI)

The article written by a management consultant, discusses the art of successful planning and operation of maintenance in mines considering factors such as benchmaking, key performance indices (KPIs) and frequency of procedures which can help achieve 'world class maintenance'. 1 fig.

Tomlingson, P.D. [Paul D. Tomingson Associates (United States)

2007-08-15T23:59:59.000Z

250

Indoor Air Quality Observations in Public Schools  

E-Print Network (OSTI)

Investigations of indoor air qmlity or indoor environment problems were accomplished in seven different Texas schools. The schools were located in hot and humid climates. Comfort and mildew were the most frequent complaints. In all cases, the air-conditioning system maintenance and operation was a primary factor in the problem cause and solution. The significance of problems investigated cculd have been minimized had the symptoms been addressed when they were reported the first time. Preventive maintenance and better housekeeping of air-conditioning systems in Texas schools will improve the indoor environment. Schools are encouraged to be more aggressive in preventive maintenance and plan for indoor air quality and energy efficiency in school air-conditioning retrofits.

McClure, J. D.; Estes, J. M.

1990-01-01T23:59:59.000Z

251

OpenEI Community - Maintenance  

Open Energy Info (EERE)

maintenance maintenance March 8-9, 2013 http://en.openei.org/community/blog/openei-maintenance-march-8-9-2013  We would like to inform the OpenEI community that OpenEI will be undergoing a significant software upgrade during a maintenance window this weekend.  We will be upgrading the wiki and semantic mediawiki portions of OpenEI, which means /datasets, /apps, /lod, /sparql and /community will continue to function normally.  Additionally, web services that rely on Ask queries (utility rate database API) may have some downtime as we transition.maintenance-march-8-9-2013" target="_blank">read more

252

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

7BA003539 7BA003539 Maintenance Sheet for 2011 Hyundai Sonata Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 7/19/2011 5,720 Changed oil and filter $14.67 10/12/2011 11,152 Changed oil and filter and rotated tires $60.49 10/21/2011 12,342 Upgraded ECU (TG5), replaced NVLD pressure sensor (TG6), and replaced cooling fan resistor (TG8) warranty 11/21/2011 16,442 Changed oil and filter $43.22 12/20/2011 22,497 Changed oil and filter and rotated tires $56.85 1/24/2012 28,205 Changed oil and filter $41.85 2/6/2012 30,100 30K service $109.16 2/9/2012 30,460 Recall: replaced two high voltage connectors at the HPCU n/c 2/27/2012 33,208 Changed oil and filter and rotated tires $56.85 3/24/2012 40,809 Changed oil and filter $41.85 4/20/2012 47,580 Changed oil and filter and rotated tires

253

Federal Energy Management Program: Predictive Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

to someone by E-mail to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance on Facebook Tweet about Federal Energy Management Program: Predictive Maintenance on Twitter Bookmark Federal Energy Management Program: Predictive Maintenance on Google Bookmark Federal Energy Management Program: Predictive Maintenance on Delicious Rank Federal Energy Management Program: Predictive Maintenance on Digg Find More places to share Federal Energy Management Program: Predictive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources

254

Feasibility Study of Economics and Performance of Biopower at the Chanute Air Force Base in Rantoul, Illinois. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites  

DOE Green Energy (OSTI)

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Chanute Air Force Base site in Rantoul, Illinois, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this study was to assess the site for a possible biopower system installation and estimate the cost, performance, and impacts of different biopower options.

Scarlata, C.; Mosey, G.

2013-05-01T23:59:59.000Z

255

Institute for Software Technology Maintenance Proze  

E-Print Network (OSTI)

Maintenance Institute for Software Technology Ersatz es bestehenden Systems Idee: Maintenance ist teuer. Durch! #12;VU Software Maintenance Institute for Software Technology Fehler im neuen System Software ist Management berücksichtigt Maintenance-Ziele und Rahmenbedingungen VU Software Maintenance Institute

256

Consolidated Air Mobility Planning System (CAMPS): An Air Mobility Planning and  

E-Print Network (OSTI)

, the initial development of CAMPS was concluded and primary maintenance responsibility was turned over for Transportation Analysis (CTA) Research Areas Aviation Safety Air Traffic Management Analysis Data, Statistical Analysis Highway Safety Intelligent Transportation Systems Logistics Management Supply Chain Management

257

Nuclear Maintenance Applications Center: Maintenance Engineer Fundamentals Handbook  

Science Conference Proceedings (OSTI)

Power plant engineering is a specialized form of engineering not usually taught in universities. In an effort to provide degreed mechanical, electrical, chemical, civil, and nuclear engineers and maintenance specialists the practical information needed to quickly become effective plant engineers, the Electric Power Research Institute (EPRI) developed the Maintenance Engineer Fundamentals Handbook: An EPRI Course (TR-106853) and corresponding training course in 1996. As the retirement rate of today's hig...

2007-12-20T23:59:59.000Z

258

Nuclear Maintenance Applications Center: Preventive Maintenance Program Guideline  

Science Conference Proceedings (OSTI)

Over the years, the Electric Power Research Institute (EPRI) has developed many technical documents to aid in developing effective preventive, predictive, and condition monitoring maintenance programs to ensure equipment reliability and availability. The industry has drawn on this information to establish or enhance preventive maintenance (PM) programs. However, not all PM program processes have been implemented, leaving some programs marginally effective and vulnerable to failure. The purpose of this re...

2011-07-11T23:59:59.000Z

259

Nuclear Maintenance Applications Center: Crane Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

This report is an update to the original guideline, published in December 2000 as Electric Power Research Institute (EPRI) report 1000986, and supersedes it in its entirety. This updated guide provides technical, maintenance, operational, training, inspection, and troubleshooting information for overhead bridge cranes used in nuclear power plants. Individual utilities can use this guide as a reference document that provides detailed component information, in-depth overhead bridge crane maintenance practi...

2011-03-07T23:59:59.000Z

260

Maintenance-free automotive battery  

SciTech Connect

Two types of maintenance-free automotive batteries were developed by Japan Storage Battery Co. to obtain a maintenance-free battery for practical use and to prevent deterioration of the battery during long storage and/or shipment. Design considerations included a special grid alloy, the separator, plate surface area, vent structure, and electrolyte. Charge characteristics, overcharge characteristics, life characteristics under various conditions, and self-discharge characteristics are presented. The characteristics of the maintenance-free battery with a Pb-Ca alloy grid are superior to those of a conventional battery. 10 figures, 1 table. (RWR)

Kano, S.; Ando, K.

1978-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Predictive Maintenance Primer: Revision to NP-7205  

Science Conference Proceedings (OSTI)

The "Predictive Maintenance Primer" revision provides nuclear plant personnel with current information regarding the predictive maintenance technologies and their applications. This guide will assist a plant in improving its predictive maintenance program.

2003-11-06T23:59:59.000Z

262

Robust Maintenance Policies in Asset Management  

E-Print Network (OSTI)

Optimal Maintenance and Repair Policies in Asset ManagementROBUST MAINTENANCE POLICIES IN ASSET MANAGEMENT Kenneth D.management policies and shows how the proposed approach may reduce maintenance and

Kuhn, Kenneth D.; Madanat, Samer M.

2005-01-01T23:59:59.000Z

263

The Clean Air Mercury Rule  

SciTech Connect

Coming into force on July 15, 2005, the US Clean Air Mercury Rule will use a market-based cap-and-trade approach under Section 111 of the Clean Air Act to reduce mercury emissions from the electric power sector. This article provides a comprehensive summary of the new rule. 14 refs., 2 tabs.

Michael Rossler [Edison Electric Institute, Washington, DC (US)

2005-07-01T23:59:59.000Z

264

Computerized asset management and maintenance systems in ST  

E-Print Network (OSTI)

The ST division manages and therefore maintains the CERN technical installations. A maintenance database application exists for every technical domain. A total of six different databases were built during the last 10 years and are based on the RAPIER maintenance program. As the Computerized Asset Management and Maintenance Systems (CAMMS) technology has evolved, the RAPIER system has become obsolete. Therefore we are forced to migrate to its latest version, MP5, before the year 2000. The migration path must be defined, leading from the current situation to a fully operational MP5 application. The major elements of each migration path consist in determining the functionality to use, defining the operation of it, adapting and/or creating procedures, converting data and providing training. A migration is always a process of change. The migration presents a unique opportunity to evaluate the current implementations, adapt them to the requirements and exploit the new features offered. Obsolete data and inconsisten...

Snchez-Corral, E

1999-01-01T23:59:59.000Z

265

Photovoltaic Operation and Maintenance Evaluation  

Science Conference Proceedings (OSTI)

Results from this study confirm that photovoltaic power plants require low operating and maintenance costs per kilowatthour. Projections based on these results suggest that in the future costs will fall below 0.5 cent per kilowatthour.

1990-01-11T23:59:59.000Z

266

HEV Fleet Testing Maintenance Sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

Bicyclist rams vehicle denting hood. Damage not repaired. (not included in maintenance costs) ---- 10292002 9,594 Oil change 20.67 1242003 12,953 Oil change 20.67 623...

267

An Outlook on Truth Maintenance  

E-Print Network (OSTI)

Truth maintenance systems have been used in several recent problem solving systems to record justifications for deduced assertions, to track down the assumptions which underlie contradictions when they arise, and to ...

McAllester, David A.

1980-08-01T23:59:59.000Z

268

Maintenance of DOE Technical Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TECHNICAL STANDARDS TECHNICAL STANDARDS PROGRAM PROCEDURES DOE-TSPP-9 Revision: 5 Date: August 1, 2000 MAINTENANCE OF DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-9 Maintenance Revision: 5 Date: August 1, 2000 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1

269

Condition-Based Maintenance Guideline  

Science Conference Proceedings (OSTI)

Since the 1980s, EPRI has published various documents relating to predictive or condition-based maintenance (CBM) programs. These documents have served as a foundation for predictive maintenance programs within our industry. Many of these published documents are now more than 10 years old. As a result, EPRI is reviewing these documents to compare them with current practices and programs. EPRIs initial goal is to revise and update the guidance and create a principal core document on predictive and conditi...

2011-11-16T23:59:59.000Z

270

Federal Energy Management Program: Computerized Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Computerized Maintenance Management Systems to someone by E-mail Share Federal Energy Management Program: Computerized Maintenance Management Systems on Facebook Tweet about Federal Energy Management Program: Computerized Maintenance Management Systems on Twitter Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Google Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Delicious Rank Federal Energy Management Program: Computerized Maintenance Management Systems on Digg Find More places to share Federal Energy Management Program: Computerized Maintenance Management Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

271

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Program Management to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Management on Facebook Tweet about...

272

Federal Energy Management Program: Computerized Maintenance Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

Computerized Maintenance Management Systems Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and...

273

Federal Energy Management Program: Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Find out about effective metering at Federal facilities Computerized Maintenance Management Systems: Learn about the evaluation and integration of these systems Maintenance...

274

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Best Practices Guide to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Best Practices Guide on Facebook Tweet about...

275

MaintenanceRecords  

NLE Websites -- All DOE Office Websites (Extended Search)

1/22/2010 1/22/2010 4,894 Changed oil and filter $60.70 12/18/2010 10,075 Changed oil and filter $60.70 12/22/2010 10,651 Replaced driver-side headlight $32.78 2/18/2011 20,255 Changed oil and filter $60.70 3/29/2011 25,267 Changed oil and filter $60.70 5/16/2011 30,509 Changed oil and filter and replaced fanbelt $116.20 6/28/2011 34,831 Replaced alternator/water pump belt and tow fees $80.50 7/8/2011 35,652 Changed oil and filter and replaced air filter $80.88 7/13/2011 35,885 Installed two tires $277.25 7/27/2011 36,982 Towed vehicle and replaced alternator/water pump belt $300.00 8/8/2011 37,738 Repaired left front tire $10.00 9/1/2011 40,384 Replaced alternator belt $45.00 9/8/2011 40,948 Changed oil and filter $60.70 10/22/2011 43,484 30K mile service $192.45 10/26/2011 43,492 Replaced front brake pads and cleaned and adjusted rear brake shoes

276

Conservation for window air conditioners: a guide for homeowners and weatherization crews  

SciTech Connect

Recommendations are made on the maintenance, operation, and shading of existing window air conditioners for the purpose of helping home owners conserve energy. (LCL)

Riley, J.T.; Haumberger, H. Jr.; Riley, K.L.

1978-01-01T23:59:59.000Z

277

Gas turbine operating and maintenance experience in Saudi Arabia  

SciTech Connect

Operation and maintenance of the gas turbines in Saudi Arabia, utilized to drive crude oil shipping pumps and process gas compressors, are discussed. Operation on wet, sour gas is taken into account, emphasizing the hot corrosion problem and the approaches taken to solve it. Intake air filtration is examined, indicating that as a result of an in depth study it was decided to retrofit the turbines with a three stage air filtration system. The methods for applying corrosion resistant coatings to the blades are considered, as are the overhaul logistics and the repair procedures.

Anderson, A.W.

1979-03-01T23:59:59.000Z

278

Application of Standard Maintenance Windows in PHWR Outage  

SciTech Connect

The concept of Standard Maintenance Windows has been widely used in the planned outage of light water reactor in the world. However, due to the specific feature of Pressurized Heavy Water Reactor (PHWR), it has not come to a consensus for the PHWR owners to adopt Standard Maintenance Windows for planned outage aiming at the optimization of outage duration. Third Qinshan Nuclear Power Company (TQNPC), with their experience gained in the previous outages and with reference to other PHWR power plants, has identified a set of Standard Maintenance Windows for planned outage. It can be applied to similar PHWR plants and with a few windows that are specific to Qinshan Phase III NPP. The use of these Standard Maintenance Windows in planned outage has been proved to be effective in control shutdown nuclear safety, minimize the unavailability of safety system, improve the efficient utilization of outage duration, and improved the flexibility of outage schedule in the case of emergency issue, which forced the revision of outage schedule. It has also formed a solid foundation for benchmarking. The identification of Standard Maintenance Windows and its application will be discussed with relevant cases for the common improvement of outage duration. (author)

Fuming Jiang [Third Qinshan Nuclear Power Company, Ltd. (China)

2006-07-01T23:59:59.000Z

279

Real-time turbine maintenance system  

Science Conference Proceedings (OSTI)

Reliable power generation and low maintenance costs are the major goals of power plant administration. This goal, in fact, can be achieved by a proper turbine maintenance policy. This study presents a model for total productive maintenance to enhance ... Keywords: Radio frequency identification, Total productive maintenance, Turbine

Tung-Liang Chen

2009-05-01T23:59:59.000Z

280

NMAC Post Maintenance Testing Guide, Revision 1  

Science Conference Proceedings (OSTI)

This Nuclear Maintenance Applications Center (NMAC) guide addresses the concern of member utilities regarding the adequacy and consistency of post-maintenance testing programs. The guide provides information on structuring, developing, organizing, and controlling a post-maintenance testing program in a power plant. It stresses the importance of advance planning to post-maintenance testing.

2004-12-08T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Generator Bushing Installation and Maintenance Guide  

Science Conference Proceedings (OSTI)

This report is a comprehensive guide to generator high-voltage bushing (HVB) installation and maintenance.

2008-12-04T23:59:59.000Z

282

CRAD, Maintenance Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Assessment Plan Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of parts, materials, and services needed to support the

283

What is Force  

Science Conference Proceedings (OSTI)

... force may be balanced by an opposing force so that no energy is expended ... The unit of force is the Newton (N). By definition, the newton is the force ...

2011-10-03T23:59:59.000Z

284

Design specifications for the air mobility operations simulation environment (Air MOOSE)  

Science Conference Proceedings (OSTI)

The Canadian Forces (CF) air mobility community is facing a period of considerable transition over the next decade or so as its fixed wing airlift capability, represented primarily by the aging C-130 fleet of E- and H-model Hercules and a fleet of five ... Keywords: Canadian Forces, air mobility, airlift operations, discrete event simulation

David W. Mason

2009-03-01T23:59:59.000Z

285

Operations and Maintenance Manual for Large Aperture Scanner System  

Science Conference Proceedings (OSTI)

Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

Jones, Anthony M.; Hall, Thomas E.

2010-04-08T23:59:59.000Z

286

Hot air drum evaporator  

DOE Patents (OSTI)

An evaporation system for aqueous radioactive waste uses standard 30 and 55 gallon drums. Waste solutions form cascading water sprays as they pass over a number of trays arranged in a vertical stack within a drum. Hot dry air is circulated radially of the drum through the water sprays thereby removing water vapor. The system is encased in concrete to prevent exposure to radioactivity. The use of standard 30 and 55 gallon drums permits an inexpensive compact modular design that is readily disposable, thus eliminating maintenance and radiation build-up problems encountered with conventional evaporation systems.

Black, Roger L. (Idaho Falls, ID)

1981-01-01T23:59:59.000Z

287

Substation battery-maintenance procedures  

SciTech Connect

The frequency of substation battery failures is gratifyingly low. One trouble spot appears to be extraneous short circuits that drain an otherwise healthy battery. Use of the lead--calcium battery promises to reduce substantially the amount of maintenance that substation batteries need.

Timmerman, M.H.

1976-05-15T23:59:59.000Z

288

Air Quality  

NLE Websites -- All DOE Office Websites (Extended Search)

What We Monitor & Why » What We Monitor & Why » Air Quality Air Quality To preserve our existing wilderness-area air quality, LANL implements a conscientious program of air monitoring. April 12, 2012 Real-time data monitoring for particulate matter An air monitoring field team member tests one of LANL's tapered element oscillating microbalance samplers, which collects real-time particulate matter data. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email LANL monitors air quality 24 hours a day, 365 days a year. Why we monitor air LANL monitors many different pathways in order to assess their impact on workers, the public, animals, and plants. We monitor the air around the Laboratory to ensure our operations are not affecting the air of nearby

289

Ga Air Compressor, Ga Air Compressor Products, Ga Air ...  

U.S. Energy Information Administration (EIA)

Ga Air Compressor, You Can Buy Various High Quality Ga Air Compressor Products from Global Ga Air Compressor Suppliers and Ga Air Compressor ...

290

Nuclear Maintenance Applications Center: Maintenance Work Package Planning Guidance  

Science Conference Proceedings (OSTI)

The work management process is one of the core business processes outlined within the Nuclear Energy Institute (NEI) Standard Nuclear Performance Model for operation and maintenance of nuclear power plants. The preparation of work packages is a key element of this overall process. The purpose of this report is to provide guidance to power plant personnel regarding work package quality as a supplement to Institute of Nuclear Power Operations (INPO) AP-928, Work Management Process Description. The ...

2013-09-10T23:59:59.000Z

291

Reliability-based maintenance evaluations and standard preventive maintenance programs  

SciTech Connect

Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the [open quotes]Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants[close quotes] prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated ([approximately]50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized.

Varno, M. (Vermont Yankee Nuclear Power Corp., Vernon, VT (United States)); McKinley, M. (Quadrex Energy Services Corp., Campbell, CA (United States))

1993-01-01T23:59:59.000Z

292

Halving the Casimir force with conductive oxides  

E-Print Network (OSTI)

The possibility to modify the strength of the Casimir effect by tailoring the dielectric functions of the interacting surfaces is regarded as a unique opportunity in the development of Micro- and NanoElectroMechanical Systems. In air, however, one expects that, unless noble metals are used, the electrostatic force arising from trapped charges overcomes the Casimir attraction, leaving no room for exploitation of Casimir force engineering at ambient conditions. Here we show that, in the presence of a conductive oxide, the Casimir force can be the dominant interaction even in air, and that the use of conductive oxides allows one to reduce the Casimir force up to a factor of 2 when compared to noble metals.

S. de Man; K. Heeck; R. J. Wijngaarden; D. Iannuzzi

2009-01-23T23:59:59.000Z

293

Mining Surveillance and Maintenance Dollars  

Science Conference Proceedings (OSTI)

Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

MARTINEZ, R.

2000-02-01T23:59:59.000Z

294

Computerized Maintenance Management Systems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations & Maintenance » Computerized Program Areas » Operations & Maintenance » Computerized Maintenance Management Systems Computerized Maintenance Management Systems October 7, 2013 - 9:35am Addthis Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff. Capabilities Typical CMMS functions depend on the complexity of the system chosen. Examples include: Work order generation, prioritization, and tracking by equipment and/or component. Work orders often can be sorted by equipment, date, person responding, etc. Tracking scheduled and unscheduled maintenance activities Storing technical documentation and maintenance procedures by

295

Federal Energy Management Program: Maintenance Types  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Types Maintenance Types Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the following can ensure an optimal blend of cost and life-cycle effectiveness: Reactive Maintenance: Follows a "run it until it breaks" strategy. No action or effort is taken to maintain equipment, prevent failure, or ensure life of the system - even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time or machine run time schedules. Predictive Maintenance: Strives to detect the onset of equipment degradation and address the problems as they are identified. Several predictive maintenance technologies exist.

296

Electric Motor Predictive Maintenance: Draft Guidelines  

Science Conference Proceedings (OSTI)

Predictive Maintenance can enhance the early detection and avoidance of incipient equipment failures in electric motors. This report provides draft guidelines to support the development of electric motor predictive maintenance (EMPM) programs at utility sites.

1997-10-16T23:59:59.000Z

297

Maintenance cost studies of present aircraft subsystems  

E-Print Network (OSTI)

This report describes two detailed studies of actual maintenance costs for present transport aircraft. The first part describes maintenance costs for jet transport aircraft broken down into subsystem costs according to an ...

Pearlman, Chaim Herman Shalom

1966-01-01T23:59:59.000Z

298

A quality assurance program for software maintenance  

Science Conference Proceedings (OSTI)

This paper presents the description of a quality assurance (QA) program applied to software maintenance projects. The QA program is a set of checks or inspections overlaid on the steps of the maintenance project. The relationship between the QA program ...

John W. Center

1982-06-01T23:59:59.000Z

299

Improving maintenance operation through transformational outsourcing  

E-Print Network (OSTI)

Outsourcing maintenance to third-party contractors has become an increasingly popular option for manufacturers to achieve tactical and/or strategic objectives. Though simple in concept, maintenance outsourcing is difficult ...

Ye, Jacqueline Ming-Shih

2007-01-01T23:59:59.000Z

300

EPRI Maintenance Excellence Matrix Revision Status  

Science Conference Proceedings (OSTI)

This report documents the progress in revising the Electric Power Research Institute EPRI 2002 Report 1004705, Maintenance Excellence Matrix Assessment Guideline for Fossil Power Plants, which provides utilities a comprehensive self-assessment guideline for improving maintenance processes.

2008-12-23T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Wind Turbine Lubrication Maintenance Guide  

Science Conference Proceedings (OSTI)

With the rush to develop todays massive wind energy sites, more attention should be paid to the inevitable need to perform routine maintenance and develop practical means of assessing the condition of the components within the nacelles and other outside support equipment for the wind farms. Current operating models have not adequately established accurate assumptions or expectations on the unavailability of the windmills and the impact on lost generation. Contracts for purchase of their generation output...

2012-06-20T23:59:59.000Z

302

Categorical Exclusion for Maintenance Work  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Work Maintenance Work along the Electrical District 5 to Saguaro segment (41/4 to 58/5) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kV Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures (41/4-8, 4214, 43/6, 4417, 45/4,46/6,47/2,49/2,49/6,50/2,50/6,50/8,51/4, 52/3, 54/3, 5517, 56/1 57/1-3, 57/8 & 58/2-3), because the wood poles failed stability tests, cross arms are beyond

303

Africa's Transport Infrastructure Mainstreaming Maintenance and...  

Open Energy Info (EERE)

icon Twitter icon Africa's Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary Name: Africa's Transport Infrastructure...

304

Operations and Maintenance for Major Equipment Types | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Major Equipment Types for Major Equipment Types Operations and Maintenance for Major Equipment Types October 7, 2013 - 9:53am Addthis Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc. No single resource covers all equipment in use by Federal agencies, and listing major equipment types is beyond the scope of this website. Instead, the Federal Energy Management Program (FEMP) outlines major equipment types within chapter 9 of the Federal Energy Management Programs's (FEMP) O&M Best Practices Guide. The FEMP O&M Best Practices Guide focuses on: Boilers Steam traps Chillers Cooling towers Energy management and building automation systems Air handling systems

305

Electric Motor Predictive and Preventive Maintenance Guide  

Science Conference Proceedings (OSTI)

Electric motor failure could result in lost capacity as well as excessive repair and maintenance costs. This guide provides information on establishing an effective maintenance program to help prevent unexpected motor failures, costly downtime, and unnecessary maintenance costs. Specifically, the guide summarizes technical data relative to four basic power plant motor types and associated components.

1992-05-02T23:59:59.000Z

306

Knowledge-Projection for Tele-Maintenance  

E-Print Network (OSTI)

-to-end system fault diagnosis and repair ­ Opening up opportunities to streamline the maintenance process Demo Data Mining GUI Query & Browse Facility System Trainer · Maintenance Procedures · Session Capture Navigator Query Engine Query Processing & Knowledge Retrieval Process Engine Dynamic Maintenance Management

Tu, Yicheng

307

Electrohydraulic Control (EHC) Fluid Maintenance Guide  

Science Conference Proceedings (OSTI)

The "Electrohydraulic Control (EHC) Fluid Maintenance Guide" provides plant personnel with information on the operation, maintenance, and performance of the electrohydraulic control (EHC) system. The contents of this guide will aid plant workers in improving EHC system reliability, performance, and plant maintenance practices.

2002-12-29T23:59:59.000Z

308

Streamlined Reliability Centered Maintenance Analysis Application Update  

Science Conference Proceedings (OSTI)

A systematic evaluation of plant equipment and maintenance requirements using reliability centered maintenance (RCM) techniques can help hold down operating costs while maintaining plant availability and reliability. This report describes the application of streamlined reliability centered maintenance (streamlined RCM) methodology and software at four utilities.

2001-10-18T23:59:59.000Z

309

Robust Maintenance Policies for Markovian Systems under Model Uncertainty  

E-Print Network (OSTI)

of various pavement management maintenance actions, (MadanatOptimal maintenance decisions for pavement management,Optimal Maintenance and Repair Policies in Asset Management

Kuhn, Kenneth D.; Madanat, Samer M.

2005-01-01T23:59:59.000Z

310

Robust maintenance policies for Markovian systems under model uncertainty  

E-Print Network (OSTI)

of various pavement management maintenance actions, (MadanatOptimal maintenance decisions for pavement management,Optimal Maintenance and Repair Policies in Asset Management

Kuhn, K D; Madanat, S M

2006-01-01T23:59:59.000Z

311

WSDOT highway maintenance: environmental compliance for protected terrestrial species  

E-Print Network (OSTI)

in figure 3. Maintenance Activity Best Management PracticesOlympic Region Maintenance Program on management recommen-If a maintenance activity is not exempt, Best Management

OBrien, Tracie; Carey, Marion; Forrester, Bret

2005-01-01T23:59:59.000Z

312

Building Energy Software Tools Directory: Maintenance Edge  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintenance Edge Maintenance Edge Maintenance Edge logo Maintenance Edge is a suite of online Software as a Service (SaaS) facility management tools that gives control and management over buildings without a capital investment. Maintenance Edge enables you to combine work order, planned maintenance, work order wireless, and critical alarms with the option of adding inventory. Fully implemented, Maintenance Edge will cut labor time, increase energy efficiencies, save on capital expenditures, and save on budget and management time. Features include: easy/user-friendly work order requesting, unlimited users, seven different user roles (limits data users can see), no capital or hardware costs required, access to data anywhere anytime, easy-to-click reporting on all the data in your system,

313

Topographically Forced Convergence in Western Washington State  

Science Conference Proceedings (OSTI)

Several times a year when the low-level winds from off the Pacific Ocean are within a narrow range of speed and direction, air passes both north and south of the Olympic Mountains of Washington State and is forced to converge in Puget Sound by ...

Clifford Mass

1981-06-01T23:59:59.000Z

314

TOWARDS A MAINTENANCE SEMANTIC ARCHITECTURE Mohamed Hedi Karraya  

E-Print Network (OSTI)

packages (Computerized Maintenance Management System). The daily events of maintenance were treated a complex information system for maintenance management [9]. The project aimed to develop a collaborative including the existing systems of data acquisition, control, maintenance management, diagnosis assistance

Paris-Sud XI, Université de

315

FEDERAL SMART GRID TASK FORCE - February 26, 2009 Task Force...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL SMART GRID TASK FORCE - February 26, 2009 Task Force Meeting Agenda FEDERAL SMART GRID TASK FORCE - February 26, 2009 Task Force Meeting Agenda February 26, 2009 Task Force...

316

Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3  

Science Conference Proceedings (OSTI)

The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

Leigh, Richard J.

2012-09-01T23:59:59.000Z

317

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations and Maintenance Operations and Maintenance Operations and Maintenance October 16, 2013 - 5:01pm Addthis Project Construction Commissioning Operations & Maintenance Operations and maintenance (O&M) programs are critical to successfully integrating renewable energy into new Federal building construction and major renovations. This overview covers the importance of O&M programs for renewable energy projects, creating a successful O&M program, and identifying the right team to carry out the program. It highlights typical renewable energy issues and recommends following the design, specifications, and recommendations from product manufacturers. Key Actions in Operations and Maintenance Make O&M a priority to protect agency investment. Include O&M input in design reviews.

318

Predictive Maintenance Technologies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Technologies Maintenance Technologies Predictive Maintenance Technologies October 28, 2013 - 10:15am Addthis Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs. Chapter 6 of the FEMP O&M Best Practices Guide (PDF 721 KB) outlines these technologies in detail. The full guide is also available (PDF 3.3 MB). Predictive maintenance technologies include: Thermography: Infrared imaging is used to generate visual images that identify variations in the infrared radiance of object surfaces. This method can be used to detect system surface wear, leaks, or failures. Lubricant and Wear Particle Analysis (a.k.a. Oil Analysis): Detailed analysis is taken to determine needed maintenance based on lubrication

319

Guidelines for Developing a Preventive Maintenance (PM) Program: Identifying, Prioritizing, and Implementing PM Tasks: Summary of Le ssons Learned for Maintenance Basis Optimization on Fossil, Combined-Cycle, Co Generation, and Renewable Assets  

Science Conference Proceedings (OSTI)

Power generation utilities are under continued and increased pressure to reduce power generation costs while increasing equipment reliability. In addition, the industrys aging engineering and maintenance work force is being replaced with less-experienced personnel; therefore, capturing the knowledge and information for sustaining and continuously improving the preventive maintenance (PM) task bases and the overall PM program are critical pieces to meeting these challenges.Over the ...

2012-12-12T23:59:59.000Z

320

Condition-Based Maintenance Program Coordinator Guideline  

Science Conference Proceedings (OSTI)

Condition-based maintenance (CBM) is an important component of an effective plant equipment reliability (ER) program, and in support of plant activities and undertakings in this area, in 2011 EPRI and an industry Technical Advisory Group (TAG) collaborated to produce the Condition-Based Maintenance Guideline (EPRI product 1022957). That document, a revision of the earlier four-volume Predictive Maintenance Guidelines, clearly defines the CBM process and serves as a core resource on ...

2013-03-28T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Numerical Simulation on Forced Swirl Combustion Chamber in Diesel Engine  

Science Conference Proceedings (OSTI)

A concept of forced swirl combustion chamber in diesel engine is proposed in this paper. It can be used to enhance the intensity of swirl flow in the cylinder and accelerate the rate of air-fuel mixture process by designing the special structure in the ... Keywords: diesel engine, forced swirl, combustion chamber, simulation

Yong Shang; Fu-shui Liu; Xiang-rong Li

2010-12-01T23:59:59.000Z

322

Numerical Simulation on Forced Swirl Combustion Chamber in Diesel Engine  

Science Conference Proceedings (OSTI)

A concept of forced swirl combustion chamber in diesel engine is proposed in this paper. It can be used to enhance the intensity of swirl flow in the cylinder and accelerate the rate of air-fuel mixture process by designing the special structure in the ... Keywords: diesel engine, forced swirl, combustion chamber, simulation

Shang Yong; Liu Fu-shui; Li Xiang-rong

2011-02-01T23:59:59.000Z

323

FACILITY MAINTENANCE MANAGEMENT QUALIFICATION STANDARD REFERENCE GUIDE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Facility Maintenance Management Qualification Standard Reference Guide NOVEMBER 2009 Table of Contents i FIGURES...................................................................................................................................... iv TABLES........................................................................................................................................ iv ACRONYMS ................................................................................................................................. v PURPOSE...................................................................................................................................... 1 SCOPE ...........................................................................................................................................

324

DSOM (Decision Support for Operations and Maintenance ...  

Summary. Operations and maintenance (O&M) can make or break a business - especially with today's rising energy costs. DSOM (Decision Support for ...

325

Risk-averse periodic preventive maintenance optimization.  

E-Print Network (OSTI)

??We consider a class of periodic preventive maintenance (PM) optimization problems, for a single piece of equipment that deteriorates with time or use, and can (more)

Singh, Inderjeet,1978-

2011-01-01T23:59:59.000Z

326

Operations and maintenance reports | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

from an expert Take a comprehensive approach Operations and maintenance reports ENERGY STAR Building Upgrade Manual Install renewable energy systems Save water to save energy...

327

Pacific Northwest National Laboratory Grounds Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Pacific Northwest National Laboratory (PNNL) operates an award-winning grounds maintenance program that comprises a comprehensive landscape and irrigation management program. The...

328

Federal Energy Management Program: Predictive Maintenance Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance Technologies on Facebook Tweet about Federal Energy Management Program: Predictive...

329

Empowering Operations and Maintenance through Wireless  

Science Conference Proceedings (OSTI)

Presentation Title, Empowering Operations and Maintenance through Wireless. Author(s), Neil Freeman, Soroush Amidi, David Fisk. On-Site Speaker (Planned)

330

maintenance. This research is relevant to opera-tions and maintenance challenges facing aging  

E-Print Network (OSTI)

maintenance. This research is relevant to opera- tions and maintenance challenges facing aging to make equipment last longer.Economic pressures to maintain aging fleets of commercial and military

331

Connecticut Light & Power - Operation and Maintenance Program...  

Open Energy Info (EERE)

Air conditioners, Steam-system upgrades, Compressed air, Programmable Thermostats, Energy Mgmt. SystemsBuilding Controls, Motors, Motor VFDs, Processing and Manufacturing...

332

Forced Trench Waves  

Science Conference Proceedings (OSTI)

A general theory for forced barotropic long trench waves in the presence of linear bottom friction is presented. Two specific forcing mechanisms are considered: (i) transverse fluctuations in a western boundary current as it flows across a trench,...

Lawrence A. Mysak; Andrew J. Willmott

1981-11-01T23:59:59.000Z

333

SERVOMECHANISMS WITH FORCE FEEDBACK  

SciTech Connect

A class of linear proportional servomechanisms is examined in which an electrical signal proportional to output force is used to improve performance. The effect of this "force feedback" on a positional servomechanism is analyzed as well as the effect on a special type of servomechanism which reflects load forces back to the input. This latter type of servomechanism is called "force reflecting." Laboratory models of these servormechanisms were designed and constructed, and experimental data are presented in support of the analysis. (auth)

Arzbaecher, R.C.

1960-05-01T23:59:59.000Z

334

Calibrated Atomic Force Microscopy  

Science Conference Proceedings (OSTI)

... Vorburger, SL Tan, NG Orji, J. Fu, Interlaboratory Comparison of Traceable Atomic Force Microscope Pitch Measurements, SPIE Proceedings Vol. ...

2011-10-28T23:59:59.000Z

335

Air Pollution Control Program (Alabama) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Pollution Control Program (Alabama) Air Pollution Control Program (Alabama) Air Pollution Control Program (Alabama) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Alabama Program Type Siting and Permitting Provider ADEM This rule states standards for emission inventory reporting requirements, ambient air quality standards, sampling and testing methods and guidelines for maintenance of equipment. It also states guidelines for air pollution

336

Nuclear Maintenance Applications Center: The Flowserve and Sulzer Reactor Coolant Pump Seal Maintenance Guide  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) report Main Coolant Pump Seal Maintenance Guide (TR-100855) was published in 1993. That report provided guidance on maintenance and troubleshooting of main coolant pump seals, but it was genericthe information was relevant to both PWRs and BWRs. By providing more current information, this report replaces the EPRI report Main Coolant Pump Seal Maintenance Guide.

2011-03-28T23:59:59.000Z

337

Nuclear Maintenance Applications Center: Vertical Pump Maintenance Guide -- Update to EPRI Report 1003467  

Science Conference Proceedings (OSTI)

Results from several annual Electric Power Research Institute (EPRI) Nuclear Maintenance Applications Center (NMAC) maintenance issues surveys indicate that members are experiencing difficulties with various maintenance issues associated with vertical pumps. Some of the problems identified a need for information and assistance with pump and motor ...

2012-10-15T23:59:59.000Z

338

Generation Maintenance Application Center: Combustion Turbine Combined-Cycle Heat Recovery Steam Generator Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to assist personnel involved with the maintenance of the heat recovery steam generator at a combustion gas turbine combined cycle facility, including good maintenance practices, preventive maintenance techniques and troubleshooting guidance.BackgroundCombustion turbine combined cycle (CTCC) facilities utilize various components that can be unique to this particular type of power plant. As such, owners and ...

2013-05-15T23:59:59.000Z

339

COMPRESSED-AIR ENERGY STORAGE SYSTEMS FOR STAND-ALONE OFF-GRID PHOTOVOLTAIC MODULES  

E-Print Network (OSTI)

-storage materials, flywheels, pumped hydro (PH), superconducting magnetic energy storage (SMES) and compressed airCOMPRESSED-AIR ENERGY STORAGE SYSTEMS FOR STAND-ALONE OFF-GRID PHOTOVOLTAIC MODULES Dominique, USA ABSTRACT In this work, a low-cost, low-volume, low-maintenance, small-scale compressed-air energy

Deymier, Pierre

340

Void Fraction Instrument operation and maintenance manual  

SciTech Connect

This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

1994-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Protective Relay Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

Protective relays are decision-making elements in the protection scheme for electrical power systems. A strong test and maintenance program will keep protective relays in a high state of readiness and help utilities avoid equipment damage and prolonged downtime. This guide provides recommended practices for maintenance and testing of these relays.

1993-10-02T23:59:59.000Z

342

Value-Based Operations and Maintenance Practices  

Science Conference Proceedings (OSTI)

Utilities can maximize the net corporate value of their operating and maintenance practices through a systematic approach that employs decision analysis techniques and marginal-value analysis. In a case study that confirmed the merit of the value-based approach, Duke Power Company developed and tested decision trees for specific predictive maintenance scenarios.

1995-04-14T23:59:59.000Z

343

Power Supply Maintenance and Application Guide  

Science Conference Proceedings (OSTI)

Instrument power supplies are very reliable; however, there is limited information that ties together operating history, maintenance practices, and data associated with repairing versus replacing power supplies. Also, the issue of equipment obsolescence affects many of the considerations associated with making power supply maintenance decisions.

2001-12-21T23:59:59.000Z

344

Operation and Maintenance Guidelines for Draft Fans  

Science Conference Proceedings (OSTI)

The reliability, efficiency, and safety of draft fans in fossil fuel power plants depend on effective operating and maintenance practices. These guidelines systematically present state-of-the-art techniques that utility personnel can use in operation, maintenance, troubleshooting, inspection, and weld repair of major fan components and auxiliary systems.

1999-05-13T23:59:59.000Z

345

Cathodic Protection System Application and Maintenance Guide  

Science Conference Proceedings (OSTI)

Typically, cathodic protection system equipment includes rectifiers, anodes, anode junction boxes, reference cells (electrodes), and test stations. The scope of this guide includes addressing the maintenance and testing of the system, its components, and providing appropriate recommendations. These recommendations will provide the basis for a suitable preventive (PM) and predictive (PdM) maintenance program.

2005-12-23T23:59:59.000Z

346

Information Technology for Energy and Maintenance Management  

E-Print Network (OSTI)

We describe the design of a tenant interface for energy and maintenance systems (TIEMS) in commercial buildings. TIEMS is designed for use by occupants (tenants) of commercial buildings. Our hypothesis is that by allowing tenants access to information from the energy and maintenance systems and by giving them some control over these systems, energy and maintenance performance can be improved. We used interviews with potential users and existing energy and maintenance databases to guide the design. Results of a field trial demonstrate the utility of TIEMS. We also describe the design of a maintenance and operations recommender (MORE). MORE uses information from computerized maintenance management systems (CMMS) and energy management and control systems (EMCS) to recommend what maintenance personnel should do in response to a maintenance service request. MORE integrates text descriptions of problems with sensor information related to the problem. After work orders are closed, MORE uses the information about what was actually done to solve the problem to learn how to improve its recommendations.

Villafana, L.; Federspiel, C.

2003-01-01T23:59:59.000Z

347

Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Areas » Operations and Maintenance Program Areas » Operations and Maintenance Operations and Maintenance October 4, 2013 - 5:07pm Addthis Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be maintained and operated correctly to reach their full potential. Well-executed operations and maintenance (O&M) programs promote energy efficiency and life cycle performance and can save Federal agencies 5% to 20% on annual energy bills without significant capital investments. Learn about: Federal Requirements: Look up O&M-related requirements that Federal agencies must meet as outlined by law and executive order Management Process: Learn about the operations and maintenance management process Commissioning: Get an overview of commissioning processes

348

Piezoresistive cantilever force-clamp system  

Science Conference Proceedings (OSTI)

We present a microelectromechanical device-based tool, namely, a force-clamp system that sets or ''clamps'' the scaled force and can apply designed loading profiles (e.g., constant, sinusoidal) of a desired magnitude. The system implements a piezoresistive cantilever as a force sensor and the built-in capacitive sensor of a piezoelectric actuator as a displacement sensor, such that sample indentation depth can be directly calculated from the force and displacement signals. A programmable real-time controller operating at 100 kHz feedback calculates the driving voltage of the actuator. The system has two distinct modes: a force-clamp mode that controls the force applied to a sample and a displacement-clamp mode that controls the moving distance of the actuator. We demonstrate that the system has a large dynamic range (sub-nN up to tens of {mu}N force and nm up to tens of {mu}m displacement) in both air and water, and excellent dynamic response (fast response time, instruments such as a microscope with patch-clamp electronics. We demonstrate the capabilities of the system by using it to calibrate the stiffness and sensitivity of an electrostatic actuator and to measure the mechanics of a living, freely moving Caenorhabditis elegans nematode.

Park, Sung-Jin; Petzold, Bryan C.; Pruitt, Beth L. [Department of Mechanical Engineering, Stanford University, Stanford, California 94305 (United States); Goodman, Miriam B. [Department of Molecular and Cellular Physiology, Stanford University, Stanford, California 94305 (United States)

2011-04-15T23:59:59.000Z

349

AQUIS: A PC-based air quality and permit information system  

SciTech Connect

The Air Quality Utility Information System (AQUIS) was developed to calculate and track emissions, permits, and related information. The system runs on IBM-compatible personal computers using dBASE IV. AQUIS tracks more than 900 data items distributed among various source categories and allows the user to enter specific information on permit control devices, stacks, and related regulatory requirements. The system is currently operating at seven US Air Force Materiel Command facilities, large industrial operations involved in the repair and maintenance of aircraft. Environmental management personnel are responsible for the compliance status of as many as l,000 sources at each facility. The usefulness of the system has been enhanced by providing a flexible reporting capability that permits users who are unfamiliar with database structure to design and prepare reports containing specified information. In addition to the standard six pollutants, AQUIS calculates compound-specific emissions and allows users to enter their own emission estimates. This capability will be useful in developing air toxics inventories and control plans.

Smith, A.E.; Huber, C.C.; Tschanz, J. [Argonne National Lab., IL (United States); Ryckman, J.S. Jr. [Air Force Air Materiel Command, Wright-Patterson AFB, OH (United States)

1992-09-01T23:59:59.000Z

350

Federal Energy Management Program: Reliability-Centered Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Reliability-Centered Maintenance to someone by E-mail Share Federal Energy Management Program: Reliability-Centered Maintenance on Facebook Tweet about Federal Energy Management Program: Reliability-Centered Maintenance on Twitter Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Google Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Delicious Rank Federal Energy Management Program: Reliability-Centered Maintenance on Digg Find More places to share Federal Energy Management Program: Reliability-Centered Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems

351

Federal Energy Management Program: Operations and Maintenance Contacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Contacts to someone by E-mail Contacts to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Contacts on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Contacts on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Google Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Delicious Rank Federal Energy Management Program: Operations and Maintenance Contacts on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Contacts on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types

352

CleanFleet. Final report: Volume 3, vehicle maintenance and durability  

DOE Green Energy (OSTI)

CleanFleet is a demonstration of panel vans operating on five alternative motorfuels in commercial package delivery operations in the South Coast Air Basin of California. The five alternative fuels are propane gas, compressed natural gas (CNG), California Phase 2 reformulated gasoline (RFG), methanol (M-85 with 15 percent RFG), and electricity. Data were gathered on in-use emissions, operations, and fleet economics. This volume of the final report summarizes the maintenance required on these vans from the time they were introduced into the demonstration (April through early November 1992) until the end of the demonstration in September 1994. The vans were used successfully in FedEx operations; but, to varying degrees, the alternative fuel vehicles required more maintenance than the unleaded gasoline control vehicles. The maintenance required was generally associated with the development state of the fuel-related systems. During the demonstration, no non-preventive maintenance was required on the highly developed fuel-related systems in any of the unleaded gasoline production vehicles used either as controls or as RFG test vehicles. The maintenance problems encountered with the less developed systems used in this demonstration may persist in the short term with vehicles featuring the same or similar systems. This means that fleet operators planning near-term acquisitions of vehicles incorporating such systems should consider the potential for similar problems when (1) selecting vendors and warranty provisions and (2) planning maintenance programs.

NONE

1995-12-01T23:59:59.000Z

353

Nuclear Maintenance Applications Center: Compression Fitting Application Manual  

Science Conference Proceedings (OSTI)

The Nuclear Maintenance Applications Center: Compression Fitting Application Manual provides power plant maintenance personnel with current maintenance information on this type of component used in power plants, both fossil fuel and nuclear. This guide will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs for this equipment.

2008-12-22T23:59:59.000Z

354

Burner Management System Maintenance Guide for Fossil Power Plant Personnel  

Science Conference Proceedings (OSTI)

Burner Management System Maintenance Guide for Fossil Power Plant Personnel provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist plant maintenance personnel in improving the reliability of and reducing the maintenance costs associated with the burner management system.

2008-03-25T23:59:59.000Z

355

Flue Gas Desulfurization Scrubber Maintenance Guide: Gypsum Dewatering Area  

Science Conference Proceedings (OSTI)

Flue Gas Desulfurization Scrubber Maintenance Guide: Gypsum Dewatering Area provides fossil plant maintenance personnel with current maintenance information on this system. This report will assist the plant maintenance personnel in improving the reliability and reducing the maintenance costs for this area of their scrubber system.

2009-12-08T23:59:59.000Z

356

Improved intake air filtration systems  

SciTech Connect

This report comprises the results of a project sponsored by the Pipeline Research Committee of the American Gas Association (Improved Intake Air Filtration Systems). The quality of the inlet air consumed by pipeline gas turbines plays a significant role in the performance, maintenance, and economy of turbine operations. The airborne contaminants may cause degradation of compressor blades and hot gas path components, primarily by erosion, corrosion, and fouling. Machines in the pipeline fleet have a typical average loss of 3.5% in output, chiefly caused by fouling of the gas turbine compressor. It also showed that: Air contamination could be significantly reduced by the use of more efficient air filtration systems, especially through the reduction of the quantity of smaller particles ingested.'' Filters which incorporated electrostatically charged fibers (achieved through the use of triboelectric [TE] effects) offered the most promising means for developing an improvement over paper media. The purpose of this program was to validate the use of new technology for self-cleaning air inlet filtration on gas turbine pumping applications. An approach utilizing triboelectrification of fabric filters was examined by testing to determine the penetration (efficiency), cleanability, pressure drop vs flow, and dust-holding capacity of seven pairs of filter cartridges: six fabric and one paper.

Lawson, C.C. (Lawson (Calvin C.), North Wildwood, NJ (United States))

1991-09-01T23:59:59.000Z

357

Air Resources: Prevention and Control of Air Contamination and Air  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Resources: Prevention and Control of Air Contamination and Air Air Resources: Prevention and Control of Air Contamination and Air Pollution, Air Quality Classifications and Standards, and Air Quality Area Classifications (New York) Air Resources: Prevention and Control of Air Contamination and Air Pollution, Air Quality Classifications and Standards, and Air Quality Area Classifications (New York) < Back Eligibility Agricultural Fuel Distributor Industrial Institutional Investor-Owned Utility Local Government Multi-Family Residential Municipal/Public Utility Nonprofit Rural Electric Cooperative Schools State/Provincial Govt Transportation Tribal Government Utility Program Info State New York Program Type Environmental Regulations Provider NY Department of Environmental Conservation These regulations establish emissions limits and permitting and operational

358

Africa's Transport Infrastructure Mainstreaming Maintenance and  

Open Energy Info (EERE)

Africa's Transport Infrastructure Mainstreaming Maintenance and Africa's Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management Agency/Company /Organization: World Bank Complexity/Ease of Use: Not Available Website: www.infrastructureafrica.org/system/files/Africa%27s%20Transport%20Inf Transport Toolkit Region(s): Africa & Middle East Related Tools The BEST Experiences with Bioethanol Buses The Sourcebook on Sustainable Urban Transport Alternative Fuels and Advanced Vehicles Data Center ... further results Find Another Tool FIND TRANSPORTATION TOOLS Transport infrastructure is a key requirement for economic growth. In Africa today, networks are sparse, conditions poor, transit slow and

359

Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker  

E-Print Network (OSTI)

New maintenance techniques for circuit breakers are studied in this dissertation by proposing a probabilistic maintenance model and a new methodology to assess circuit breaker condition utilizing its control circuit data. A risk-based decision approach is proposed at system level making use of the proposed new methodology, for optimizing the maintenance schedules and allocation of resources. This dissertation is focused on developing optimal maintenance strategies for circuit breakers, both at component and system level. A probabilistic maintenance model is proposed using similar approach recently introduced for power transformers. Probabilistic models give better insight into the interplay among monitoring techniques, failure modes and maintenance techniques of the component. The model is based on the concept of representing the component life time by several deterioration stages. Inspection and maintenance is introduced at each stage and model parameters are defined. A sensitivity analysis is carried to understand the importance of model parameters in obtaining optimal maintenance strategies. The analysis covers the effect of inspection rate calculated for each stage and its impact on failure probability, inspection cost, maintenance cost and failure cost. This maintenance model is best suited for long-term maintenance planning. All simulations are carried in MATLAB and how the analysis results may be used to achieve optimal maintenance schedules is discussed. A new methodology is proposed to convert data from the control circuit of a breaker into condition of the breaker by defining several performance indices for breaker assemblies. Control circuit signal timings are extracted and a probability distribution is fitted to each timing parameter. Performance indices for various assemblies such as, trip coil, close coil, auxiliary contacts etc. are defined based on the probability distributions. These indices are updated using Bayesian approach as the new data arrives. This process can be made practical by approximating the Bayesian approach calculating the indices on-line. The quantification of maintenance is achieved by computing the indices after a maintenance action and comparing with those of previously estimated ones. A risk-based decision approach to maintenance planning is proposed based on the new methodology developed for maintenance quantification. A list of events is identified for the test system under consideration, and event probability, event consequence, and hence the risk associated with each event is computed. Optimal maintenance decisions are taken based on the computed risk levels for each event. Two case studies are presented to evaluate the performance of the proposed new methodology for maintenance quantification. The risk-based decision approach is tested on IEEE Reliability Test System. All simulations are carried in MATLAB and the discussions of results are provided.

Natti, Satish

2008-12-01T23:59:59.000Z

360

Development of computer-aided maintenance resources planning (CAMRP): A case of multiple CNC machining centers  

Science Conference Proceedings (OSTI)

Total productive maintenance (TPM), total maintenance assurance, preventive maintenance, reliability-centered maintenance (RCM), and many other innovative approaches to maintenance problems all aim at enhancing the effectiveness of machines to ultimately ... Keywords: Maintenance, Resources planning, Theory of constraints

J. Ashayeri

2007-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Maintenance scheduling for modular systems-models and algorithms  

E-Print Network (OSTI)

Maintenance scheduling is an integral part of many complex systems. For instance, without effective maintenance scheduling, the combined effects of preventative and corrective maintenance can have severe impacts on the ...

Zarybnisky, Eric J. (Eric Jack), 1979-

2011-01-01T23:59:59.000Z

362

FINAL REPORT: PHASE FOUR HIGHWAY MAINTENANCE CONCEPT VEHICLE  

E-Print Network (OSTI)

the maintenance management system. Phase IV has two major strands, technical and financial. The outcome of Phase ................................................................................................................. 55 AMS-200 (Application Management System) Console innovation in highway maintenance management, maintenance operations practices, and research. CTRE provided

Beresnev, Igor

363

Information Management, Analytics & Optimization Services IMS System Maintenance Service Offering  

E-Print Network (OSTI)

Information Management, Analytics & Optimization Services IMS System Maintenance Service Offering The IMS System Maintenance Review offering is a special service offering from the IMS laboratory Technical Specialist group. Complex IMS systems require periodic maintenance, coupled with a specific testing process

364

Pulverizer Maintenance Guide, Volume 2: Babcock & Wilcox Roll Wheel Pulverizers  

Science Conference Proceedings (OSTI)

The "Pulverizer Maintenance Guide, Volume 2: B&W Roll Wheel Pulverizers" provides fossil plant personnel with current maintenance information on this specific mill design. This guide will assist a plant in improving the maintenance of their pulverizer mills.

2004-12-22T23:59:59.000Z

365

Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994  

SciTech Connect

This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

Fisk, E.L.

1994-06-01T23:59:59.000Z

366

Why measure force?  

Science Conference Proceedings (OSTI)

... Automated industrial processes such as rolling mills require accurate force measurement to control roll pressure on bar steel, sheet metal, paper ...

2011-10-03T23:59:59.000Z

367

NUCLEAR PROXIMITY FORCES  

E-Print Network (OSTI)

One might summarize of nuclear potential energy has beendegree of freedom) for the nuclear interaction between anyUniversity of California. Nuclear Proximity Forces 'I< at

Randrup, J.

2011-01-01T23:59:59.000Z

368

Compressed Air Audits using AIRMaster  

E-Print Network (OSTI)

Air compressors are a significant industrial energy user and therefore a prime target for industrial energy audits. The project goal was to develop a software tool, AIRMaster, and supporting methodology for performing compressed air system audits. Seven field audits were conducted to refine the software and methodology as well as assess the savings potential of six common Operation and Maintenance measures. Audit results yielded significant savings with short payback periods. Total estimated savings for the project were 4,056,000 kWh or 49.2% of annual compressor energy for a cost savings of $152,000. Total implementation costs were $94,700 for a project payback period of 0.6 years. Capital benefits of delaying or avoiding the cost of a new compressor might double the energy benefits if a new compressor is being considered. The methodology proved to be a simple and effective audit tool.

Wheeler, G. M.; McGill, R. D.; Bessey, E. G.; Vischer, K.

1997-04-01T23:59:59.000Z

369

A Thermodynamic Analysis of an Intense North American Arctic Air Mass  

Science Conference Proceedings (OSTI)

Northwestern Canada is a genesis region of arctic air masses often considered to be formed primarily through radiative processes. However, the details of their life cycle are poorly understood. This paper examines the formation, maintenance, and ...

Jessica K. Turner; John Gyakum; Shawn M. Milrad

2013-01-01T23:59:59.000Z

370

Implementing lean methodologies within a maintenance organization  

E-Print Network (OSTI)

The primary goal of the project was to make the machine maintenance process more efficient. In order to do this, we conducted a 3-day Value Stream Mapping workshop, during which we generated a map of the present value ...

Levine, Dana Ari

2009-01-01T23:59:59.000Z

371

Improve Operations & Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improve Operations & Maintenance Improve Operations & Maintenance Improve Operations & Maintenance Photo of an equipment room in a high-rise commercial office building with red and green equipment. Every building's energy consumption can benefit from rigorous operations and maintenance (O&M) practices. Properly planned and executed O&M is one of the most cost-effective strategies for ensuring equipment longevity, reliability, safety, and energy efficiency in commercial buildings. By one estimate, O&M measures cost about 20 times less and achieve roughly the same energy savings as energy efficiency upgrades. There are various opportunities to improve efficiency through O&M that can be discovered through efforts such as engaging tenants, training building staff, and

372

Infrared Thermometry in Winter Road Maintenance  

Science Conference Proceedings (OSTI)

There is significant interest among road authorities in measuring pavement conditions to perform appropriate winter road maintenance. The most common monitoring methods are based on pavement-mounted sensors. This studys hypothesis is that the ...

Patrik Jonsson; Mats Riehm

2012-06-01T23:59:59.000Z

373

Steam Turbine Hydraulic Control system Maintenance Guide  

Science Conference Proceedings (OSTI)

Steam turbine hydraulic control system maintenance problems have been a significant factor in plant power reductions, shutdowns, and lost generation. This guide provides recommendations to improve the reliability of the hydraulic components and fluid.

1996-12-31T23:59:59.000Z

374

Low-Maintenance Wind Power System  

E-Print Network (OSTI)

with widespread adoption of wind energy. The project hasProject: Low-Maintenance Wind Power System Summary of theImproved Vertical Axis Wind Turbine and Aerodynamic Control

Rasson, Joseph E

2010-01-01T23:59:59.000Z

375

Optimization Online - Optimizing Preventive Maintenance Models  

E-Print Network (OSTI)

Jun 29, 2004 ... Optimizing Preventive Maintenance Models ... It is assumed that there is a known model which predicts the frequency of system failure as a function of ... Category 2: Applications -- OR and Management Sciences (Scheduling ).

376

An object oriented testing and maintenance environment  

Science Conference Proceedings (OSTI)

The object-oriented (OO) paradigm enjoys increasing acceptance in the software industry. Although the OO paradigm has visible benefits in the development cycle, testing and maintenance of OO programs have been considered challenging tasks by the research ...

David C. Kung; Jerry Gao; Pei Hsia

1994-10-01T23:59:59.000Z

377

Sound maintenance practices protect fan investments  

Science Conference Proceedings (OSTI)

Since underground coal miners depend on axial fans, lack of maintenance could prove costly. A number of pre-emptive actions that can help keep fans running at optimal performance can also be taken. 2 photos.

Bauer, M.

2009-11-15T23:59:59.000Z

378

Maintenance implementation plan for fuel supply shutdown  

Science Conference Proceedings (OSTI)

This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ``MAINTENANCE MANAGEMENT PROGRAM``, that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan.

Stephenson, R.L.

1995-06-01T23:59:59.000Z

379

Federal Energy Management Program: Operations and Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Management Effective management is critical to any operations and maintenance (O&M) program. The management function should bind the distinct parts of the O&M program into...

380

Fossil Maintenance Basis Optimization: Challenges and Strategies  

Science Conference Proceedings (OSTI)

This report covers many of the process challenges and strategies that were encountered and deployed during the implementation and execution of a preventive maintenance basis optimization (MBO) process at fossil generating stations. This MBO process was executed by several Electric Power Research Institutemember (EPRI-member) companies on a fleetwide basis as part of the members' plant reliability optimization (PRO) efforts. The PRO process covers many of the preventive maintenance (PM) programs at multip...

2010-05-27T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Solar Photovoltaic System Operations and Maintenance  

Science Conference Proceedings (OSTI)

Grid-connected flat plate solar photovoltaic (PV) systems are being deployed at an accelerating rate worldwide. Representing a growing absolute share of both independent power producer (IPP) and utility generation portfolios, these PV assets are now commanding a greater level of attention to ensure their optimal availability and performance. Contrary to popular belief, PV power plants are not maintenance free; in fact, they require a steady diet of scheduled preventive maintenance and unscheduled service...

2011-12-22T23:59:59.000Z

382

Advanced Electric Motor Predictive Maintenance Project  

Science Conference Proceedings (OSTI)

EPRI sponsored the three-year Advanced Electric Motor Predictive Maintenance (AEMPM) project in 2000 to increase the effectiveness of motor maintenance at a time when utilities were in a state of declining motor knowledge due to downsizing and restructuring. The project identified areas for improvement that were common to most utilities and selected appropriate measures to address these concerns. Areas addressed include documenting motor knowledge, increasing utility confidence in newer technologies and ...

2003-05-28T23:59:59.000Z

383

Performance Focused Maintenance for Distribution Substations  

Science Conference Proceedings (OSTI)

Performance Focused Maintenance (PFM) was introduced in 2005 as a generic concept to help maintenance managers cope with the competing objectives of maintaining service standards while containing costs. This report further develops the principles of PFM and integrates them into the larger power delivery asset management process. As the name implies, PFM focuses on performance and this report develops and demonstrates the steps required to establish proper performance measures and KPIs for PFM implementat...

2006-12-19T23:59:59.000Z

384

Capital and Maintenance Projects for Efficiency Improvements  

Science Conference Proceedings (OSTI)

This Electric Power Research Institute (EPRI) project developed a methodology to assess the costs and benefits of potential maintenance improvements to coal-fired power plants, refined the methodology developed in 2008 to assess the net annual benefit of potential capital improvements to these plants, and applied the methodologies to a hypothetical plant. The calculations are captured in two spreadsheets8212one for capital projects and the other for maintenance projects8212that are included in the report...

2009-10-13T23:59:59.000Z

385

Federal Energy Management Program: Resources on Operations and Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Resources on Resources on Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Resources on Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Resources on Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Google Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Delicious Rank Federal Energy Management Program: Resources on Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Resources on Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning

386

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance Program Structure to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Structure on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Structure on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Structure on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Structure on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements

387

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations and Operations and Maintenance Program Implementation to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Implementation on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Implementation on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Implementation on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Implementation on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

388

Joint Maintenance Status Report of Potomac Electric Power Company...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

389

Requirements-Based Surveillance and Maintenance Review Guide...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Maintenance Review Guide Appendix A - Requirements-Based Surveillance and Maintenance Review Implementation Process, Process Flow Chart and the Flow Chart Footnotes...

390

Attention to maintenance is key to longer battery life  

SciTech Connect

A unique way for battery maintenance on electric truck is described. This system is involved in multi-shift operation entailing battery changing, charging, and programed maintenance.

1975-08-01T23:59:59.000Z

391

An overview of time-based and condition-based maintenance in industrial application  

Science Conference Proceedings (OSTI)

This paper presents an overview of two maintenance techniques widely discussed in the literature: time-based maintenance (TBM) and condition-based maintenance (CBM). The paper discusses how the TBM and CBM techniques work toward maintenance decision ... Keywords: Condition-based maintenance, Industrial application, Maintenance decision making, Maintenance techniques, Preventive maintenance, Time-based maintenance

Rosmaini Ahmad; Shahrul Kamaruddin

2012-08-01T23:59:59.000Z

392

Advanced Remote Maintenance Design for Pilot-Scale Centrifugal Contactors  

Science Conference Proceedings (OSTI)

Advanced designs of used nuclear fuel recycling processes and radioactive waste treatment processes are expected to include more ambitious goals for aqueous based separations including; higher separations efficiency, high-level waste minimization, and a greater focus on continuous processes to minimize cost and footprint. Therefore, annular centrifugal contactors are destined to play a more important role for such future processing schemes. Pilot-scale testing will be an integral part of development of many of these processes. An advanced design for remote maintenance of pilot-scale centrifugal contactors has been developed and a prototype module fabricated and tested for a commercially available pilot-scale centrifugal contactor (CINC V-02, 5-cm rotor diameter). Advanced design features include air actuated clamps for holding the motor-rotor assembly in place, an integral electrical connection, upper flange o-rings, a welded bottom plate, a lifting bale, and guide pins. These design features will allow for rapid replacement of the motor rotor assembly, which can be accomplished while maintaining process equilibrium. Hydraulic testing of a three-stage prototype unit was also performed to verify that design changes did not impact performance of the centrifugal contactors. Details of the pilot-scale remote maintenance design, results of testing in a remote mockup test facility, and results of hydraulic testing of the advanced design are provided.

Jack Law; David Meikrantz; Troy Garn; Lawrence Macaluso

2011-02-01T23:59:59.000Z

393

IAQ in Hospitals - Better Health through Indoor Air Quality Awareness  

E-Print Network (OSTI)

Quality air is fundamental to people's health and well-being. Indoor air quality is an important issue from both a social and economic point of view. Continual advances in medicine and technology necessitate constant reevaluation of the air-conditioning needs of hospital and medical facilities. The application of air conditioning to health facilities presents many problems not encountered in the usual comfort air conditioning design. Hospital air conditioning assumes a more important role than just the promotion of comfort. Studies show that patients in controlled environment generally have more rapid physical improvement than do those in uncontrolled environment. Air quality at hospitals needs special precautions during design and maintenance stage to prevent infections from spreading. 50% of all illnesses are either caused by, or aggravated by, polluted indoor air. The main objective of this paper is to critically review and summarize the available information about IAQ particularly in health care industries. Symptoms of poor IAQ in a building, contaminants causing poor IAQ, features of HVAC systems for a hospital for better IAQ are briefly discussed in this paper. Strategies to improve indoor air quality in hospitals and the current international research to improve indoor air quality are reported in this paper. Based on the extensive interactions with different stake holders of a hospital it is concluded that maintenance of proper indoor quality in a hospital needs meticulous team work among the various members of the hospital at various stages .

Al-Rajhi, S.; Ramaswamy, M.; Al-Jahwari, F.

2010-01-01T23:59:59.000Z

394

Nuclear Maintenance Applications Center: Generator Maintenance Guide for Emergency Diesel Generators (Japanese Version)  

Science Conference Proceedings (OSTI)

This report is a Japanese translation of Electric Power Research Institute (EPRI) Technical Report 1021479. EPRI developed this report to address maintenance and improve long-term reliability and availability of generators within nuclear power plant emergency diesel generator (EDG) systems. Maintenance of generator stators and rotors is the focus of this report, which highlights maintenance tasks and strategies that can be performed to identify generator degradation and prevent unforeseen failures. This ...

2012-03-21T23:59:59.000Z

395

Nuclear Maintenance Applications Center: Maintenance Engineering Fundamentals for Nuclear Utility Personnel - Student Handbook  

Science Conference Proceedings (OSTI)

This EPRI report is the student handbook for participants in a training course on maintenance engineering fundamentals for nuclear utility personnel. The training course was developed in conjunction with EPRI report 1015307, Nuclear Maintenance Applications Center: Maintenance Engineer Fundamentals Handbook. Among the materials in the student handbook are an overview of the entire course; lists of pertinent definitions, acronyms, and resource materials; summaries of learning objectives and key points for...

2008-12-22T23:59:59.000Z

396

Generation Maintenance Application Center: Fuel Gas System for Combustion Turbine Combined Cycle Plant Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to assist personnel involved with the maintenance of the fuel gas system at a gas turbine combined cycle facility, including good maintenance practices, preventive maintenance techniques and troubleshooting guidance.BackgroundCombustion turbine combined cycle (CTCC) facilities utilize various components that can be unique to this particular type of power plant. As such, owners and operators of CTCC facilities may find ...

2013-05-15T23:59:59.000Z

397

Safety, Capacity, Maintenance, and Major Repair  

Science Conference Proceedings (OSTI)

... Continue repairing or replacing aging utility systems, exhaust and air ... Continue improvements to site infrastructure, including roads, loading docks ...

2010-10-05T23:59:59.000Z

398

ILC Citizens' Task Force  

NLE Websites -- All DOE Office Websites (Extended Search)

the Fermilab ILC Citizens' Task Force June 2008 Report of the Fermilab ILC Citizens' Task Force 3 Contents 1 Executive Summary 3 Chapter 1 Purpose 7 Chapter 2 Origins and Purpose of the Fermilab Citizens' Task Force 15 Chapter 3 Setting the Stage 19 Chapter 4 Current Status of High Energy Physics Research 25 Chapter 5 Bringing the Next-Generation Accelerator to Fermilab 31 Chapter 6 Learning from Past Projects 37 Chapter 7 Location, Construction and Operation of Facilities Beyond Fermilab's Borders 45 Chapter 8 Health and Safety 49 Chapter 9 Environment 53 Chapter 10 Economics 59 Chapter 11 Political Considerations 65 Chapter 12 Community Engagement 77 Chapter 13 Summary 81 Appendices Appendix A. Task Force Members Appendix B. Task Force Meetings and Topics

399

Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Maintenance to Vehicle Maintenance to Conserve Fuel to someone by E-mail Share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Facebook Tweet about Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Twitter Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Google Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Delicious Rank Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Digg Find More places to share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on AddThis.com... More in this section... Idle Reduction Parts & Equipment Maintenance Driving Behavior Fleet Rightsizing System Efficiency Vehicle Maintenance to Conserve Fuel A comprehensive vehicle maintenance strategy can help fleet managers and

400

The Effect of Reduced Evaporator Air Flow on the Performance of a Residential Central Air Conditioner  

E-Print Network (OSTI)

This paper discusses the measured degradation in performance of a residential air conditioning system operating under reduced evaporator air flow. Experiments were conducted using a R-22 three-ton split-type cooling system with a short-tube orifice expansion device. Results are presented here for a series of tests in which the evaporator air flow was reduced from 25 to 90% below what is normally recommended for this air conditioner. At present, very little information is available which quantifies the performance of a residential cooling system operating under degraded conditions such as reduced evaporator air flow. Degraded performance measurements can provide information which could help electric utilities evaluate the potential impact of system-wide maintenance programs.

Palani, M.; O'Neal, D.; Haberl, J.

1992-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Texas Clean Air Act (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Texas Clean Air Act (Texas) Texas Clean Air Act (Texas) Texas Clean Air Act (Texas) < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility Industrial Construction Municipal/Public Utility Local Government Rural Electric Cooperative Tribal Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Program Info State Texas Program Type Environmental Regulations Provider Texas Commission on Environmental Quality This Act is designed to safeguard the state's air resources from pollution by requiring the control and abatement of air pollution and emissions of air contaminants, consistent with the protection of public health, general welfare, and physical property, including the esthetic enjoyment of air resources by the public and the maintenance of adequate visibility. The Act

402

OOTW Force Design Tools  

Science Conference Proceedings (OSTI)

This report documents refined requirements for tools to aid the process of force design in Operations Other Than War (OOTWs). It recommends actions for the creation of one tool and work on other tools relating to mission planning. It also identifies the governmental agencies and commands with interests in each tool, from whom should come the user advisory groups overseeing the respective tool development activities. The understanding of OOTWs and their analytical support requirements has matured to the point where action can be taken in three areas: force design, collaborative analysis, and impact analysis. While the nature of the action and the length of time before complete results can be expected depends on the area, in each case the action should begin immediately. Force design for OOTWs is not a technically difficult process. Like force design for combat operations, it is a process of matching the capabilities of forces against the specified and implied tasks of the operation, considering the constraints of logistics, transport and force availabilities. However, there is a critical difference that restricts the usefulness of combat force design tools for OOTWs: the combat tools are built to infer non-combat capability requirements from combat capability requirements and cannot reverse the direction of the inference, as is required for OOTWs. Recently, OOTWs have played a larger role in force assessment, system effectiveness and tradeoff analysis, and concept and doctrine development and analysis. In the first Quadrennial Defense Review (QDR), each of the Services created its own OOTW force design tool. Unfortunately, the tools address different parts of the problem and do not coordinate the use of competing capabilities. These tools satisfied the immediate requirements of the QDR, but do not provide a long-term cost-effective solution.

Bell, R.E.; Hartley, D.S.III; Packard, S.L.

1999-05-01T23:59:59.000Z

403

Safety assured financial evaluation of maintenance  

E-Print Network (OSTI)

Management decisions in complex industrial facilities usually consider both the economic and environmental aspects of the plant's performance. For nuclear power plants (NPPs), safety is also a very substantial issue. The objectives of this dissertation are to develop and demonstrate a novel useful conceptual model that could be used to allocate maintenance funds for a nuclear power plant in such a way as to meet all specified safety requirements and objectives, while achieving a high degree of economic performance. The model is based on the general theory that the reliability of a plant at any time is a function of its initial reliability and the maintenance history of the individual plant components (Smith, 1997). Such a model can assist in evaluating strategic management decisions regarding allocation of funds for nuclear power plant maintenance. It could be used as a simulation tool; various scenarios could be studied to answer "what if" questions. Simulations of this type will allow a better understanding of the relationship between maintenance, economic performance, and safety, and consequently will lead to better decision making. The novelty of this model is tied to the intimate relationship that it develops between maintenance activities at a nuclear plant, and their relationship to prescribed safety requirements and to the economic performance of that plant.

Erguina, Vera

2005-05-01T23:59:59.000Z

404

Eng. Opt., 2002, Vol. 34, pp. 561577 DESIGNING FOR MAINTENANCE  

E-Print Network (OSTI)

of a series of absorption chillers for an industrial complex. Keywords: Maintenance; Game theory; Decision

Seepersad, Carolyn Conner

405

Flue Gas Desulfurization Scrubber Maintenance Guide: Absorber Area  

Science Conference Proceedings (OSTI)

The Flue Gas Desulfurization Scrubber Maintenance Guide: Absorber Area provides fossil plant maintenance personnel with current maintenance information on this system and will help to improve the reliability of and reduce the maintenance costs for this area of their scrubber system.

2008-12-18T23:59:59.000Z

406

Fundamental Laws and Assumptions of Software Maintenance Adam A. Porter  

E-Print Network (OSTI)

environments. The longer a system stays in service, the larger maintenance costs are, and, therefore, it­oriented programming languages, software architectures and configuration management. Managing the maintenance process. Maintenance is costly and somewhat unpredictable. Thus, management tools for controlling maintenance

Porter, Adam

407

Flue Gas Desulfurization Scrubber Maintenance Guide: Reagent Preparation Area  

Science Conference Proceedings (OSTI)

The Flue Gas Desulfurization Scrubber Maintenance Guide: Reagent Preparation Area provides the fossil plant maintenance personnel with current maintenance information on this system and will help improve the reliability and reduce the maintenance costs for this area of their scrubber system.

2008-12-15T23:59:59.000Z

408

A condition-based maintenance policy for intelligent monitored system  

Science Conference Proceedings (OSTI)

This study proposes a sequential Condition-Based Maintenance (CBM) policy for intelligent monitored system based on cost and reliability prioritisation. It is assumed that system's reliability could be continuously monitored, whenever ... Keywords: CBM, condition-based maintenance, cost, intelligent monitoring, maintenance policy, optimisation, predictive maintenance, reliability, simulation

Wenzhu Liao; Ershun Pan; Lifeng Xi

2009-06-01T23:59:59.000Z

409

Federal Energy Management Program: Operations and Maintenance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Support to someone by E-mail Management Support to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Management Support on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Management Support on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Google Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Delicious Rank Federal Energy Management Program: Operations and Maintenance Management Support on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Management Support on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

410

Federal Energy Management Program: Operations and Maintenance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Measurement to someone by E-mail Measurement to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Measurement on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Measurement on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Measurement on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Measurement on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

411

Air Pollution (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

This article states regulations for monitoring air pollution, methods for permit applications, emission limitations for pollutants and air quality standards.

412

Constraint and Restoring Force  

E-Print Network (OSTI)

Long-lived sensor network applications must be able to self-repair and adapt to changing demands. We introduce a new approach for doing so: Constraint and Restoring Force. CRF is a physics-inspired framework for computing ...

Beal, Jacob

2007-08-24T23:59:59.000Z

413

Optical Bernoulli forces  

E-Print Network (OSTI)

By Bernoulli's law, an increase in the relative speed of a fluid around a body is accompanied by a decrease in the pressure. Therefore, a rotating body in a fluid stream experiences a force perpendicular to the motion of ...

Movassagh, Ramis

414

Reduction-in-Force  

Energy.gov (U.S. Department of Energy (DOE))

Reduction in force (RIF) is a set of regulations and procedures that are used to determine whether an employee keeps his or her present position, or whether the employee has a right to another...

415

Industrial operations and maintenance energy measures: A review  

SciTech Connect

Industry consumes a significant percentage of the total electric energy consumption both nationally and in the Pacific Northwest. However, industrial demand-side management (DSM) activities in this sector are underdeveloped and typically concentrate on new technologies and new equipment. An overlooked opportunity for electric resource development is through operations and maintenance (O and M) activities. The purpose of this project is to determine the industrial DSM potential that may be achieved through O and M practices both in the US and the Pacific Northwest. The overall goal of the project is to identify, quantify, confirm, and develop conservation resources that can be achieved from the industrial sector through O and M practices and energy measures. The results of the study identify a significant electric resource potential available through improved O and M activities in industry. Several O and M type energy-saving measures that increase efficiencies and reduce loads are identified and estimates of potential energy savings associated with each measure are presented. Systems identified with the most potential include compressed-air systems; motors and motor drives; lighting; heating, ventilating and air conditioning (HVAC); and control systems. The results of the research show that industrial electric energy consumption can be notably reduced by implementing key O and M type energy measures. Specifically, the results of industrial energy audits, case studies, and other published sources indicate that reductions in energy consumption from improved O and M activities can average between 8% and 12.5%.

Parker, S.A.; Gaustad, K.L.; Winiarski, D.W.

1994-12-01T23:59:59.000Z

416

POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POST-DEACTIVATION SURVEILLANCE AND POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING Post-Deactivation Surveillance and Maintenance Planning Dependence of End-Points Planning on S&M Planning Primary Surveillance Concerns Typical Deactivation S&M Plan Contents Example of a Post-Deactivation S&M Plan Dependence of End-Points Planning on S&M Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is

417

Operations and Maintenance Manual | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manual Manual Operations and Maintenance Manual October 16, 2013 - 5:00pm Addthis Closeout of the construction phase for renewable energy projects includes the creation of a comprehensive operations and maintenance (O&M) manual. Although specific content varies depending on the size, scope, and complexity of the project, the O&M manual typically includes manufacturer literature, basic operating procedures, troubleshooting techniques, measurement and verification (M&V) system documentation, and maintenance information. The general contractor should compile O&M documentation, gather as-built drawings for equipment and systems, and take the lead in organizing the manual. The commissioning agent reviews the manual to verify that it includes all necessary documentation, including:

418

software maintenance in Distributed, EVOLVing Environments  

E-Print Network (OSTI)

Distributed applications in evolving environments are typically difficult to maintain. Currently, human intervention is needed to maintain the application and adapt it to its changed environment. We need to: deploy application software on the added devices (buses), replace application software on the changed devices (e.g. to support the new advertisement display), and remove application software when no longer useful (e.g. because it requires an advertisement display which is removed). When the distributed environment becomes too large, or changes too often, manual software maintenance is no longer a feasible option. Automation is required. This paper reports on our ongoing work on dEVOLVe, a new OSGi based middleware platform which will automate some software maintenance tasks in distributed evolving environments. dEVOLVe will detect changes in the distributed environment and will adapt the application accordingly. This way, the user is free from software maintenance tasks caused by the environment evolution.

Bart Elen; Sam Michiels; Wouter Joosen; Pierre Verbaeten; Bart Elen; Sam Michiels; Wouter Joosen; Pierre Verbaeten

2008-01-01T23:59:59.000Z

419

Ameresco and Elmendorf Air Force Base: SPP Success Story | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify...

420

Scientists Report First Observation of an Atomic Air Force  

Science Conference Proceedings (OSTI)

... orbit but then very quickly decay back to the lower energy state by ... cubic arrangement of the atomic clusters changes as the intensity and frequency ...

2012-12-20T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Residential Forced Air System Cabinet Leakage and Blower Performance  

E-Print Network (OSTI)

inResidentialSpaceConditioning Systems. Canadianin residential space conditioning systems. Keywords:in residential space conditioning systems. This standard

Walker, Iain S.

2010-01-01T23:59:59.000Z

422

Ameresco and Hill Air Force Base: SPP Success Story | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

manufacturing resources K-12 school resources Multifamily housing resources Restaurant resources Retail resources Senior care resources Small business resources State and...

423

Energy reduction strategies for existing Air Force healthcare facilities  

E-Print Network (OSTI)

Federal buildings are required to reduce 30% of their energy use intensities (energy use per square foot) by 2015 and 37.5% by 2020. Additionally, 15% of federal buildings are required to achieve an Energy Star Rating of ...

Ramos, Jose I. (Jose Israel)

2013-01-01T23:59:59.000Z

424

The Impact of Forced Air System Blowers on Furnace Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Canadian provinces and part owner of UNIES Ltd., an engineering firm in Winnipeg, Manitoba (60 miles straight north of the North DakotaMinnesota border). He does research and...

425

Residential Forced Air System Cabinet Leakage and Blower Performance  

E-Print Network (OSTI)

2008?004?CMF. CaliforniaEnergy Commission,Sacramento,2008?002?CMF. CaliforniaEnergyCommission, Sacramento,wassupportedbytheCaliforniaEnergyCommission Public

Walker, Iain S.

2010-01-01T23:59:59.000Z

426

EGLIN AIR FORCE BASE INVASIVE NON-NATIVE PLANT CONTROL  

E-Print Network (OSTI)

Torpedo Grass CogonGrass Chinese Tallow Japanese Climbing Fern #12;Wide Range of Habitats /Dispersal Mechanisms Barrier Island Sand Dune Flatwood Swamp CHINESE TALLOW CHINESE TALLOW #12;Application Equipment treatments Urban Interface Plantation Cut Stump #12;More Treatments COGON GRASS TALLOW TREES CLIMBING FERN

Watson, Craig A.

427

Register Closing Effects on Forced Air Heating System Performance  

E-Print Network (OSTI)

with gypsum wallboard and plywood, with carefully tapedenvelope and covered using plywood plates as illustrated in

Walker, Iain S.

2003-01-01T23:59:59.000Z

428

NNSA, Air Force Conduct Three Successful Joint Flight Tests ...  

NLE Websites -- All DOE Office Websites (Extended Search)

National LaboratoriesCalifornia. The JTA test components are manufactured at the Kansas City Plant are then assembled at the Pantex Plant in Amarillo, Texas. The NNSA Tonopah...

429

Hill Air Force Base as a case study for linking  

E-Print Network (OSTI)

ANACONDA ("MORTARVILLE") near Balad Iraq, April 2004 ­ March 2005. #12;Great Salt Lake WASATCHMOUNTAINRANGE

430

Residential Forced Air System Cabinet Leakage and Blower Performance  

E-Print Network (OSTI)

ductleakagetesting. ASHRAETransactions,June2008. ASHRAE,Atlanta,GA. LBNL62262. Walker,I.S. (Institute,Arlington,VA. ASHRAEStandard103. (2007).

Walker, Iain S.

2010-01-01T23:59:59.000Z

431

NNSA, Air Force Conduct Three Successful Joint Flight Tests ...  

National Nuclear Security Administration (NNSA)

version Facebook Twitter Youtube Flickr NNSA Blog October 2013 (1) September 2013 (18) August 2013 (17) July 2013 (20) June 2013 (19) May 2013 (25) April 2013 (17) March 2013...

432

Los Angeles Air Force Base Vehicle to Grid Pilot Project  

NLE Websites -- All DOE Office Websites (Extended Search)

both the technical challenge of V2G participation and the potential financial benefit. Optimization capability will ensure that the complex task of scheduling...

433

NETL: News Release - Energy Department, Air Force Research Laboratorie...  

NLE Websites -- All DOE Office Websites (Extended Search)

development, and demonstrations related to clean aviation fuels, fuel additives, and lubricants. The five-year, cost-shared effort supports DOE's Ultra Clean Transportation...

434

Brig. Gen. Dawkins honored at Air Force promotion ceremony |...  

National Nuclear Security Administration (NNSA)

Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We...

435

Weak nuclear forces cause the strong nuclear force  

E-Print Network (OSTI)

We determine the strength of the weak nuclear force which holds the lattices of the elementary particles together. We also determine the strength of the strong nuclear force which emanates from the sides of the nuclear lattices. The strong force is the sum of the unsaturated weak forces at the surface of the nuclear lattices. The strong force is then about ten to the power of 6 times stronger than the weak force between two lattice points.

E. L. Koschmieder

2007-12-11T23:59:59.000Z

436

Valve Application, Maintenance, and Repair Guide  

Science Conference Proceedings (OSTI)

The Valve Application, Maintenance, and Repair Guide is a two-volume series that provides a generic overview of valve application, selection, maintenance, and repair. Volume 1 of the series is a comprehensive reference on the application and use of valves that provides guidance on the selection of specific types of valves on the basis of functional and system requirements. This document is based on an earlier EPRI document (NP-6516, Guide for the Application and Use of Valves in Power Plant Systems). Ext...

1999-05-07T23:59:59.000Z

437

TRUPACT-II Container Maintenance Program Plan  

Science Conference Proceedings (OSTI)

This document details the maintenance, repair, and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container in accordance with OM-134, TRUPACT-II Container Operations and Maintenance Manual; and the TRUPACT-II Container Certificate of Compliance (Number 9218). The routine shipping and receiving inspections required by the Department of Transportation (DOT), Department of Energy (DOE), Nuclear Regulatory Commission (NRC) and other regulations are not addressed in this document. This document applies to all DOE shipping and receiving sites that use the TRUPACT-II containers.

Not Available

1991-05-01T23:59:59.000Z

438

ATLAS Maintenance and Operation management system  

E-Print Network (OSTI)

The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

Copy, B

2007-01-01T23:59:59.000Z

439

Maintenance and operation of a small wind generator in the marine environment. Final report  

SciTech Connect

This report discusses the maintenance and operation of a wind-turbine generator that has been undergoing tests as a source of energy for remote Coast Guard lighthouses. The report documents both the effects of operating the wind machine in the marine environment and the maintenance that it required. Design parameters and performance records of the generator are also evaluated. The HR2 is a horizontal-axis, upwind-oriented, three-bladed wind machine. It is equipped with a direct-drive system that allows the kinetic force captured by the propeller to be converted directly into rotational force driving the main shaft. The HR2 alternator and blade/hub system are allowed to tilt out of a near-vertical plane about a shaft and bearing mechanism. The VARCS is a torsion spring- and hinge-mechanism that acts against the lifting dynamics of the spinning blades. As high winds or gusts tilt the alternator about the hinge, the VARCS's spring opposes this force and regulates the blades angle of attack into the wind; the propeller's RPM drop when tilted because of the feathering action. If the wind subsides, the force of the VARCS spring drives the alternator assembly down and presents the blades back into the wind.

Heerlein, W.

1986-07-01T23:59:59.000Z

440

Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities  

SciTech Connect

This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-09-28T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities  

SciTech Connect

This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-09-28T23:59:59.000Z

442

Hoisting and Rigging: Inspection and Maintenance Requirements  

E-Print Network (OSTI)

Devices, Slings, and Rigging Hardware and Accessories (SLAC-I-730-0A21S-036) Hoisting and Rigging: PreHoisting and Rigging: Inspection and Maintenance Requirements URL: http://www-group.slac.stanford.edu/esh/eshmanual/references/hoisting Department: Field Safety and Building Inspection Program: Hoisting and Rigging Authority: ESH Manual, Chapter

Wechsler, Risa H.

443

Davis PV plant operation and maintenance manual  

DOE Green Energy (OSTI)

This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

NONE

1994-09-01T23:59:59.000Z

444

Utilities are doing too much breaker maintenance  

Science Conference Proceedings (OSTI)

Many breaker failures occur after the breaker has been torn down for maintenance because some error was made in reassembling it. Utilities now can get a better understanding of circuit breaker reliability as the result of a worldwide survey conducted by the International Conference on Large High-Voltage Electric Systems (Cigre) of the reliability of circuit breakers 63 kV and above. The most significant finding is that the rate of major failures have dropped drastically with the introduction of modern SF[sub 6] breakers (from 1.58 to 0.67 per 100 breaker-years). But the rate of minor failures - such as gas leaks, which require maintenance and add to the operating cost - has increased by 30%. Incorrect maintenance causes far fewer failures in modern breakers, simply because they have to be torn down less frequently. Only 15% as many major failures and 77% as many minor failures can be attributed to incorrect maintenance. The failure to open or close on command are still the dominant major-failure modes of circuit breakers. 4 tabs.

Heising, C. (Reliability Consultant, Wynnewood, PA (United States))

1994-12-01T23:59:59.000Z

445

Incremental computation and maintenance of temporal aggregates  

Science Conference Proceedings (OSTI)

Abstract.We consider the problems of computing aggregation queries in temporal databases and of maintaining materialized temporal aggregate views efficiently. The latter problem is particularly challenging since a single data update can cause aggregate ... Keywords: Access methods, Aggregation, B-tree, Segment tree, Temporal database, View maintenance

Jun Yang; Jennifer Widom

2003-10-01T23:59:59.000Z

446

Constraint capture and maintenance in engineering design  

Science Conference Proceedings (OSTI)

The Designers' Workbench is a system developed by the Advanced Knowledge Technologies Consortium to support designers in large organizations, such as Rolls-Royce, to ensure that the design is consistent with the specification for the particular design ... Keywords: Application Conditions, Capture, Constraints, Design, Maintenance, Rationales

Suraj Ajit; Derek Sleeman; David w. Fowler; David Knott

2008-11-01T23:59:59.000Z

447

Asphalt, Concrete, and Turf Maintenance and Preservation  

E-Print Network (OSTI)

. These tools are: Pavement management programs. A pavement management system is the name given to one in a serviceable condition over a given period of time. One of the primary benefits of a pavement management system maintenance treatment at any time. The large variation in system size and pavement type across the state

Minnesota, University of

448

Operating and maintenance experience in tritium environments  

Science Conference Proceedings (OSTI)

This presentation is a summary of practical experience gained over more than twenty years from analyzing failures of process equipment operated in tritium and deuterium environments. Significant improvements have been achieved in design and procurement of new equipment, testing and selection of materials, and gradually more favorable maintenance experience. Preferred materials and inspection methods are described. 6 tabs.

Tuer, G.L.

1987-01-01T23:59:59.000Z

449

Fifth EPRI International Conference on Maintenance Proceedings  

Science Conference Proceedings (OSTI)

The Fifth EPRI International Conference on Maintenance focused primarily on fossil and nuclear generating assets, but many topics will be applicable to other assets, as well. Equipment manufacturers, vendors, architect/engineers, and consultants will also find this conference prodedings to be informative and valuable.

2005-12-23T23:59:59.000Z

450

ICD Complex Operations and Maintenance Plan  

SciTech Connect

This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

Gibson, P. L.

2007-06-25T23:59:59.000Z

451

Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Maintenance and Safety to someone by E-mail Maintenance and Safety to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Digg Find More places to share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on AddThis.com... More in this section... Natural Gas Basics Benefits & Considerations Stations Vehicles Availability Conversions Emissions Maintenance & Safety

452

Choosing the right boiler air fans at Weston 4  

SciTech Connect

When it came to choosing the three 'big' boiler air fans - forced draft, induced draft and primary air, the decision revolved around efficiency. The decision making process for fan selection for the Western 4 supercritical coal-fired plant is described in this article. 3 photos.

Spring, N.

2009-04-15T23:59:59.000Z

453

Radiative Forcing of Climate Change  

SciTech Connect

Chapter 6 of the IPCC Third Assessment Report Climate Change 2001: The Scientific Basis. Sections include: Executive Summary 6.1 Radiative Forcing 6.2 Forcing-Response Relationship 6.3 Well-Mixed Greenhouse Gases 6.4 Stratospheric Ozone 6.5 Radiative Forcing By Tropospheric Ozone 6.6 Indirect Forcings due to Chemistry 6.7 The Direct Radiative Forcing of Tropospheric Aerosols 6.8 The Indirect Radiative Forcing of Tropospheric Aerosols 6.9 Stratospheric Aerosols 6.10 Land-use Change (Surface Albedo Effect) 6.11 Solar Forcing of Climate 6.12 Global Warming Potentials hydrocarbons 6.13 Global Mean Radiative Forcings 6.14 The Geographical Distribution of the Radiative Forcings 6.15 Time Evolution of Radiative Forcings Appendix 6.1 Elements of Radiative Forcing Concept References.

Ramaswamy, V.; Boucher, Olivier; Haigh, J.; Hauglustaine, D.; Haywood, J.; Myhre, G.; Nakajima, Takahito; Shi, Guangyu; Solomon, S.; Betts, Robert E.; Charlson, R.; Chuang, C. C.; Daniel, J. S.; Del Genio, Anthony D.; Feichter, J.; Fuglestvedt, J.; Forster, P. M.; Ghan, Steven J.; Jones, A.; Kiehl, J. T.; Koch, D.; Land, C.; Lean, J.; Lohmann, Ulrike; Minschwaner, K.; Penner, Joyce E.; Roberts, D. L.; Rodhe, H.; Roelofs, G.-J.; Rotstayn, Leon D.; Schneider, T. L.; Schumann, U.; Schwartz, Stephen E.; Schwartzkopf, M. D.; Shine, K. P.; Smith, Steven J.; Stevenson, D. S.; Stordal, F.; Tegen, I.; van Dorland, R.; Zhang, Y.; Srinivasan, J.; Joos, Fortunat

2001-10-01T23:59:59.000Z

454

Work Force Restructuring Activities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Force Restructuring Activities Force Restructuring Activities December 10, 2008 Note: Current updates are in bold # Planned Site/Contractor HQ Approved Separations Status General * LM has finalized the compilation of contractor management team separation data for the end of FY07 actuals and end of FY08 and FY09 projections. LM has submitted to Congress the FY 2007 Annual Report on contractor work force restructuring activities. The report has been posted to the LM website. *LM conducted a DOE complex-wide data call to the Field and Operations offices for DOE Contractor Management teams to provide, by program, actual contractor separation data for the end of FY 2008 and projections for the end of FY 2009 and FY 2010. The data will be used to keep senior management informed of upcoming large WFR actions.

455

Resources on Operations and Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations & Maintenance » Resources on Operations & Maintenance » Resources on Operations and Maintenance Resources on Operations and Maintenance October 7, 2013 - 9:55am Addthis Many helpful resources about operations and maintenance are available. Also see Contacts. Best Practices Operations and Maintenance Best Practices Guide: Document outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Federal Facilities Council: Website featuring events, reports, and links to National Academy websites. Commissioning Commissioning for Federal Facilities: Comprehensive information about ongoing commissioning processes to resolve operating problems, improve comfort, optimize energy use, and identify retrofits for commercial and

456

Maintenance and repair: a simulation model for field service with condition-based maintenance  

Science Conference Proceedings (OSTI)

In this paper, we consider field service in which service providers are responsible for maintaining equipment performance. To do so, preventive maintenance work is usually required in addition to repairs. Field service managers are often faced with the ...

Yiqing Lin; Arthur Hsu; Ravi Rajamani

2002-12-01T23:59:59.000Z

457

Nuclear Maintenance Applications Center: Generator Maintenance Guide for Emergency Diesel Generators  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) developed this report to address maintenance and improve long-term reliability and availability of generators within nuclear power plant emergency diesel generator (EDG) systems.

2010-12-11T23:59:59.000Z

458

Metal-Air Batteries  

Science Conference Proceedings (OSTI)

Metal-air batteries have much higher specific energies than most currently available primary and rechargeable batteries. Recent advances in electrode materials and electrolytes, as well as new designs on metal-air batteries, have attracted intensive effort in recent years, especially in the development of lithium-air batteries. The general principle in metal-air batteries will be reviewed in this chapter. The materials, preparation methods, and performances of metal-air batteries will be discussed. Two main metal-air batteries, Zn-air and Li-air batteries will be discussed in detail. Other type of metal-air batteries will also be described.

Zhang, Jiguang; Bruce, Peter G.; Zhang, Gregory

2011-08-01T23:59:59.000Z

459

Generation Maintenance Applications Center: Combined-Cycle Combustion-Turbine Static Starting System Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to assist personnel involved with the maintenance of combustion-turbine static start systems, planning, predictive, and preventive maintenance techniques; failure mode information; and troubleshooting guidance.BackgroundAs the fleet of combustion turbines grows, it is critical for the starting systems to be understood and properly maintained in order to ensure the reliability of combustion-turbine generating units and the ...

2013-03-28T23:59:59.000Z

460

Guidelines for Transitioning from Time-Based Maintenance to Condition-Based Maintenance  

Science Conference Proceedings (OSTI)

BackgroundUtilities have provided feedback to the Electric Power Research Institute (EPRI) that they do not feel that they have fully capitalized on past optimization projects. Current living programs using classical predictive maintenance technologies, component and system testing programs, existing maintenance backlogs, system monitoring, system health, and operator feedback to provide a more complete picture of equipment condition may be providing more insight into ...

2013-11-13T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Operations and Maintenance Development: Preventive Maintenance Program Implementation Self-Assessment Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Preventive maintenance (PM) programs throughout nuclear plants in the United States have evolved from strict compliance with the supplier's general recommendations (which are likely to be much too conservative) to more flexible tasks that are intended to accommodate plant-specific service conditions. During the 1990s, the industry, with support from the Electric Power Research Institute (EPRI), embarked on Preventive Maintenance Optimization (PMO) programs. Most utilities either have implemented or are i...

2007-12-20T23:59:59.000Z

462

Nuclear Maintenance Applications Center: Passive Component Maintenance Guide for Nuclear Power Plant Personnel  

Science Conference Proceedings (OSTI)

The information contained in this report represents a significant collection of technical and human performance information, including techniques and good practices, related to the design, maintenance, and operation of passive components common at most domestic nuclear power plants. Assemblage of this information provides a single point of reference for plant engineering and maintenance personnel, both in the present and in the future. Through the use of this guideline, in close conjunction with the indu...

2011-11-16T23:59:59.000Z

463

Nuclear Maintenance Applications Center: Maintenance and Modification Work Planner Training Program Description  

Science Conference Proceedings (OSTI)

The purpose of this report is to provide guidance for the development of a training program for the qualification of maintenance and modification work planners. The training program is intended to provide maintenance and modification work planners with the fundamental knowledge and skills required to prepare consistent, high quality packages aligned with site-specific and industry standards.This report provides a standard approach for developing and implementing a work planner training ...

2013-10-24T23:59:59.000Z

464

Combinations of Natural and Anthropogenic Forcings in Twentieth-Century Climate  

Science Conference Proceedings (OSTI)

Ensemble simulations are run with a global coupled climate model employing five forcing agents that influence the time evolution of globally averaged surface air temperature during the twentieth century. Two are natural (volcanoes and solar) and ...

Gerald A. Meehl; Warren M. Washington; Caspar M. Ammann; Julie M. Arblaster; T. M. L. Wigley; Claudia Tebaldi

2004-10-01T23:59:59.000Z

465

Tropospheric Adjustment Induces a Cloud Component in CO2 Forcing  

Science Conference Proceedings (OSTI)

The radiative forcing of CO2 and the climate feedback parameter are evaluated in several climate models with slab oceans by regressing the annual-mean global-mean top-of-atmosphere radiative flux against the annual-mean global-mean surface air ...

Jonathan Gregory; Mark Webb

2008-01-01T23:59:59.000Z

466

Fort Union Regional Task Forces, proceedings. Volume I  

SciTech Connect

North Dakota, South Dakota, Montana, and Wyoming created seven task forces to study the interstate effects of the Fort Union Coal Formation which underlies parts of each of these states. Volume 1 covers: (1) air quality; (2) common data element and information exchange; (3) energy development, regulation, and plant siting; and (4) reclamation and land use. (Portions of this document are not fully legible)

1977-01-01T23:59:59.000Z

467

Air-leakage control manual  

Science Conference Proceedings (OSTI)

This manual is for builders and designers who are interested in building energy-efficient homes. The purpose of the manual is to provide the ``how and why`` of controlling air leakage by means of a system called the ``Simple Caulk and Seal`` (SIMPLE{center_dot}CS) system. This manual provides an overview of the purpose and contents of the manual; It discusses the forces that affect air leakage in homes and the benefits of controlling air leakage. Also discussed are two earlier approaches for controlling air leakage and the problems with these approaches. It describes the SIMPLE-{center_dot}CS system. It outlines the standard components of the building envelope that require sealing and provides guidelines for sealing them. It outlines a step-by-step procedure for analyzing and planning the sealing effort. The procedure includes (1) identifying areas to be sealed, (2) determining the most effective and convenient stage of construction in which to do the sealing, and (3) designating the appropriate crew member or trade to be responsible for the sealing.

Maloney, J. [Washington State Energy Office, Olympia, WA (United States)

1991-05-01T23:59:59.000Z

468

Air-Leakage Control Manual.  

Science Conference Proceedings (OSTI)

This manual is for builders and designers who are interested in building energy-efficient homes. The purpose of the manual is to provide the how and why'' of controlling air leakage by means of a system called the Simple Caulk and Seal'' (SIMPLE{center dot}CS) system. This manual provides an overview of the purpose and contents of the manual; It discusses the forces that affect air leakage in homes and the benefits of controlling air leakage. Also discussed are two earlier approaches for controlling air leakage and the problems with these approaches. It describes the SIMPLE-{center dot}CS system. It outlines the standard components of the building envelope that require sealing and provides guidelines for sealing them. It outlines a step-by-step procedure for analyzing and planning the sealing effort. The procedure includes (1) identifying areas to be sealed, (2) determining the most effective and convenient stage of construction in which to do the sealing, and (3) designating the appropriate crew member or trade to be responsible for the sealing.

Maloney, Jim; Washington State Energy Office; United States. Bonneville Power Administration.

1991-05-01T23:59:59.000Z

469

Gearbox and Gear Drive Maintenance Guide  

Science Conference Proceedings (OSTI)

Rotating equipment uses many different types of devices to transmit motive force from the driver to the equipment, whether the equipment is a pump, fan, or generator. Mechanical gearboxes or gear trains are sometimes used to accomplish this task.

2004-09-03T23:59:59.000Z

470

Operations and Maintenance Team | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Team Operations and Maintenance Team October 16, 2013 - 5:00pm Addthis Assembling the right set of skills and resources to operate and maintain a renewable energy system is critical. Renewable energy technologies only perform as specified when managed by a well-trained, highly motivated operations and maintenance (O&M) team. For a renewable energy project financed through an energy savings performance contract (ESPC) or a power purchase agreement (PPA), primary O&M services are typically delivered as part of the agreement, but in-house staff will need some familiarity with the system. For agency-funded projects, O&M services may be provided by in-house facilities staff, a contracted service provider, or a combination of the two. Experienced O&M staff can provide valuable input and should be included in

471

Operations and Maintenance Training | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Training Operations and Maintenance Training October 16, 2013 - 5:01pm Addthis Key Actions in O&M Training Have O&M staff shadow Commissioning Agent during commissioning for early interaction with new renewable energy equipment. Train facility staff fully on O&M manual and building systems, regardless of O&M contracts on renewable energy systems. Provide key facility staff with general renewable energy and LEED training prior to building start-up. Look for opportunities for O&M staff to learn from external O&M contractors. To keep a renewable energy system performing at optimal levels, operations and maintenance (O&M) personnel must receive thorough training. A renewable energy system may be properly installed, but without a robust O&M program in place, it will not perform as specified over the long-term.

472

TRUPACT-II container maintenance program plan  

SciTech Connect

This document details the maintenance/repair and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container, in accordance with requirements of the TRUPACT-II Container Operations and Maintenance Manual, OM-134, the TRUPACT-II Container Safety Analysis Report (SARP), and the TRUPACT-II Container Certificate of Compliance (Number 9218). The routine shipping and receiving inspections required by the Department of Transportation (DOT), Department of Energy (DOE), Nuclear Regulatory Commission (NRC) and other regulations are not addressed in this document. This document applies to all DOE shipping and receiving sites that use the TRUPACT-II containers.

Not Available

1990-11-01T23:59:59.000Z

473

Feasibility of air capture  

E-Print Network (OSTI)

Capturing CO2 from air, referred to as Air Capture, is being proposed as a viable climate change mitigation technology. The two major benefits of air capture, reported in literature, are that it allows us to reduce the ...

Ranjan, Manya

2010-01-01T23:59:59.000Z

474

Surveillance & Maintenance: The Requirements Based Surveillance and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Surveillance & Maintenance: The Requirements Based Surveillance and Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in mission and operation of an excess facility should stimulate a review of surveillance and maintenance to determine what efficiencies can be gained as a result of the change. Such a review can be applied to facilities that undergoing stabilization, those intended for deactivation, and others destined for decommissioning. The material that follows provides

475

Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

CNG Fuel System and CNG Fuel System and Cylinder Maintenance to someone by E-mail Share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Facebook Tweet about Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Twitter Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Google Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Delicious Rank Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Digg Find More places to share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on AddThis.com... More in this section... Natural Gas Basics Benefits & Considerations Stations Vehicles Availability Conversions Emissions Maintenance & Safety

476

Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ryder Opens Natural Ryder Opens Natural Gas Vehicle Maintenance Facility to someone by E-mail Share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Facebook Tweet about Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Twitter Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Google Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Delicious Rank Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Digg Find More places to share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on AddThis.com... June 28, 2011 Ryder Opens Natural Gas Vehicle Maintenance Facility

477

SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AND MAINTENANCE AND MAINTENANCE RBSM The Requirements Based Surveillance and Maintenance Review Process Surveillance and Maintenance Overview What is RBSM and why do I need this process? Who has used this process so far? A Summary of RBSM results across the DOE complex Viewing a sample RBSM report Performing RBSM at your facility RBSM Guidance package Surveillance and Maintenance Overview Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in mission and operation of an excess facility should stimulate a review of surveillance and maintenance to determine what efficiencies can be gained as a result of the change.

478

AWEA Wind Project Operations and Maintenance and Safety Seminar...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Operations and Maintenance and Safety Seminar AWEA Wind Project Operations and Maintenance and Safety Seminar January 15, 2014 8:00AM EST to January 16, 2014 5:00PM EST San...

479

Rapid modeling of field maintenance using discrete event simulation  

Science Conference Proceedings (OSTI)

Discrete event simulation has been applied to a wide range of applications areas due to its ability to represent stochastic systems over time. Maintenance, particularly field maintenance, is complex due to the interaction of different sub-systems of ...

Abdullah A. Alabdulkarim; Peter D. Ball; Ashutosh Tiwari

2011-12-01T23:59:59.000Z

480

Pulverizer Maintenance Guide, Volume 1: Raymond Bowl Mills  

Science Conference Proceedings (OSTI)

This guide provides fossil plant personnel with current maintenance information on the Alstom Raymond Bowl mills and will assist a plant in improving the maintenance of the pulverizer mills.

2004-08-27T23:59:59.000Z

Note: This page contains sample records for the topic "maintenance air force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Insights From EPRI Maintenance Rule Projects  

Science Conference Proceedings (OSTI)

The new NRC Maintenance Rule poses numerous challenges and opportunities for utilities due to its risk- and performance-based approach. This report provides many examples of problems and their solutions in the implementation of this regulation at several nuclear power plants. A comprehensive treatment of the technical basis for three troublesome areas of the rule--risk significance measures, performance criteria, and the balance between reliability and availability--is also provided to increase utility c...

1996-06-27T23:59:59.000Z

482

Axial Compressor Performance Maintenance Guide Update  

Science Conference Proceedings (OSTI)

To deal with volatile fuel prices and growing pressures to limit greenhouse gas (GHG) emissions, combustion turbine (CT) operators are striving for maximum fuel efficiency. The axial compressor is a leading cause of short term and long term CT efficiency losses due to fouling, corrosion, and erosion. This report reviews the technology being advanced for compressor maintenance to achieve improved compressor and the CT efficiencies.

2005-02-21T23:59:59.000Z

483

Machine Maintenance Integrated Performance Support System  

SciTech Connect

The objectives of this partnership project were to develop a preventive maintenance checklist program, a troubleshooting system for the Vertical Turning Center (VTC)-5, an on-line manual, and to integrate these components with a custom browser that would run on the VTC-5 machine's controller and would support future internet/intranet delivery. Kingsbury provided subject matter experts from engineering, manufacturing, and technical support. They also provided photographs, schematics, and CAD drawings, which AlliedSignal Federal Manufacturing and Technologies (ASFM and T) digitized for use in the final program. Information from The Kingsbury troubleshooting experts were interviewed regarding symptoms and root causes of system malfunctions This knowledge was captured and from it, fault trees were developed. These trees were then incorporated into the EPSS as a troubleshooting tool. The troubleshooting portion of the system presents simple questions to the machine operator in order to determine the likely cause or causes of malfunctions and then recommends systematic corrective actions. The on-line reference manual, covering operations and maintenance, provides text and illustrations to the machine operator in a traditional structure, but additionally offers the capability to search voluminous amounts of technical data and retrieve specific information on request. The maintenance portion of the EPSS includes checklists that are displayed daily, weekly, monthly, and annually, as appropriate, on the VTC-5 controller screen. The controller software is unavailable for machining parts until the machine tool operator goes through and checks off all of the checklist items. This project provided the team with a detailed understanding of the knowledge and information required to produce and support advanced machine tools. In addition, it resulted in the design and construction of a prototype VTC-5 EPSS containing all the logic and interfaces necessary to integrate operations and maintenance information from other Kingsbury machine tools.

Bohley, M.C.; Schwartz, M.E.

1998-03-11T23:59:59.000Z

484

Wind Energy Asynchronous Generator Maintenance Guidelines  

Science Conference Proceedings (OSTI)

With the rush to develop todays massive wind energy sites, little attention is being given to the inevitable need to perform routine maintenance and develop practical means of assessing the condition of the components within the nacelles and other outside support equipment for the wind farms. Current operating models have not adequately established accurate assumptions or expectations on the unavailability of the wind turbines and the impact on lost generation. Contracts for purchase of their generation ...

2012-06-20T23:59:59.000Z

485

Risk-Informed Maintenance Decision Analysis Methodology  

Science Conference Proceedings (OSTI)

Capabilities and proposed features of a risk-informed fossil plant maintenance planning process are described in this report. This research will serve as the basis for the development of a software module deployed in enterprise asset management systems, such as the Electric Power Research Institute's (EPRI's) PlantView suite. The report provides background on how risk-informed decisions can lead to improved plant availability by prioritizing activities based on component failure modes, probabilities, and...

2007-12-20T23:59:59.000Z

486

Kalispell Maintenance Headquarters Project : Environmental Assessment.  

Science Conference Proceedings (OSTI)

The facilities needed to maintain and repair Bonneville Power Administration (BPA's) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area's maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

United States. Bonneville Power Administration.

1991-01-01T23:59:59.000Z

487

Maintenance Guide for DOE Low-Level Waste Disposal Facility  

Energy.gov (U.S. Department of Energy (DOE))

Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments and Composite Analyses

488

Nuclear Maintenance Applications Center: Knowledge Transfer Improvement Project  

Science Conference Proceedings (OSTI)

The Nuclear Maintenance Application Center has begun a project a project to explore ways to improve how our products can be more easily used by our members and, in particular, the benefit that can be derived by the worker in the field. The project focuses on developing methods for improving the delivery of information that is specifically directed at maintenance tasks that are performed as part of preventive or corrective maintenance on plant equipment. The results are intended to benefit the maintenance...

2010-12-23T23:59:59.000Z

489

Maintenance and Operations study for K basins sludge treatment  

SciTech Connect

This study evaluates maintenance and operating concepts for the chemical treatment of sludge from the 100 K Basins at Hanford. The sludge treatment equipment that will require remote operation or maintenance was identified. Then various maintenance and operating concepts used in the nuclear industry were evaluated for applicability to sludge treatment. A hot cell or cells is recommended as the best maintenance and operating concept for a sludge treatment facility.

WESTRA, A.G.

1998-11-30T23:59:59.000Z

490

Federal Energy Management Program: Boatwright Maintenance Park...  

NLE Websites -- All DOE Office Websites (Extended Search)

111,566 sq ft, and has an energy baseline of 62.2 KBtusq ft. It's highlights include spray foam roof with R-13 rating, air-source heat pumps for office spaces, and...

491

Primary zone air proportioner  

SciTech Connect

An air proportioner is provided for a liquid hydrocarbon fueled gas turbine of the type which is convertible to oil gas fuel and to coal gas fuel. The turbine includes a shell for enclosing the turbine, an air duct for venting air in said shell to a gasifier, and a fuel injector for injecting gasified fuel into the turbine. The air proportioner comprises a second air duct for venting air from the air duct for mixing with fuel from the gasifier. The air can be directly injected into the gas combustion basket along with the fuel from the injector or premixed with fuel from the gasifier prior to injection by the fuel injector.

Cleary, Edward N. G. (San Diego, CA)

1982-10-12T23:59:59.000Z

492

Air Pollution Control (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation establishes the Department of Environmental Management and the Air Pollution Control Board, which are tasked with the prevention, abatement, and control of air pollution by all...

493

A contextual semantic mediator for a distributed cooperative maintenance platform  

E-Print Network (OSTI)

platforms, Enterprise Asset Management Systems or CMMS (Computerized Maintenance Management System). Most the semantic mediator system for the platform of maintenance management. According to Wache et al in [24 and S2 two systems integrated in the maintenance platform. S1 is a system managing interventions

Paris-Sud XI, Université de

494

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES  

E-Print Network (OSTI)

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES DONALD H. GRAHAM Operations. The discussion will focus on the management, operation, and maintenance systems nec essary to support long maintenance management pro gram (j) cost accounting and a record keeping system to provide timely, accurate

Columbia University

495

Design Area for Assistance to Maintenance based on Augmented Reality  

E-Print Network (OSTI)

ARM (Augmented Reality Maintenance) and the FC SDBM (System of Database Management) (Fig.6): 1)The FC instruction. In this paper, we propose a design process of the maintenance system focused on the analysis-through Head Mounted Display (HMD). The technician of maintenance, when using this system, can interact

Paris-Sud XI, Université de

496

`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES  

E-Print Network (OSTI)

the satisfaction of customers and profits. From a global perspective of lifecycle management, the role of (e)-maintenance maintenance actions. This idleness can be due to failures of some other elements in the system. More generally. But opportunistic maintenance can help save set-up costs and guarantee the expected performances for the system

Paris-Sud XI, Université de

497

Maintenance policy: degradation laws versus Hidden Markov Model availability indicator  

E-Print Network (OSTI)

industry). Keywords: diagnosis, maintenance management, assessment, degradation laws, Hidden Markov Model 1 to manager strategies. In case of preventive maintenance, different strategies should be used like planned of the system. They use stochastic Petri nets and Markov chains to implement various maintenance strategies

Paris-Sud XI, Université de

498

Feedwater Pump Turbine Controls and Oil System Maintenance Guide  

Science Conference Proceedings (OSTI)

This guide provides information to personnel involved in the mechanical hydraulic controls (MHCs) of the feedwater pump turbine (FWPT), its associated components, and inherent oil system, including good maintenance practices, condition monitoring, predictive and preventive maintenance techniques, probable failure modes, and troubleshooting guidance. The guide was developed to provide maintenance and troubleshooting information as well as a basic background in mechanical hydraulic controls.

2001-12-20T23:59:59.000Z

499

FACILITIES MAINTENANCE & UPKEEP The Lawrence campus is operating three different custodial and maintenance groups on campus resulting in  

E-Print Network (OSTI)

facilities management system, and provide the adequate tools and training necessary. · Implementing contemporary zone maintenance will reduce management and layers, enabling costFACILITIES MAINTENANCE & UPKEEP Context · The Lawrence campus is operating three

Peterson, Blake R.

500

Force Modulator System  

SciTech Connect

Many metal parts manufacturers use large metal presses to shape sheet metal into finished products like car body parts, jet wing and fuselage surfaces, etc. These metal presses take sheet metal and - with enormous force - reshape the metal into a fully formed part in a manner of seconds. Although highly efficient, the forces involved in forming metal parts also damage the press itself, limit the metals used in part production, slow press operations and, when not properly controlled, cause the manufacture of large volumes of defective metal parts. To date, the metal-forming industry has not been able to develop a metal-holding technology that allows full control of press forces during the part forming process. This is of particular importance in the automotive lightweighting efforts under way in the US automotive manufacturing marketplace. Metalforming Controls Technology Inc. (MC2) has developed a patented press control system called the Force Modulator that has the ability to control these press forces, allowing a breakthrough in stamping process control. The technology includes a series of hydraulic cylinders that provide controlled tonnage at all points in the forming process. At the same time, the unique cylinder design allows for the generation of very high levels of clamping forces (very high tonnages) in very small spaces; a requirement for forming medium and large panels out of HSS and AHSS. Successful production application of these systems testing at multiple stamping operations - including Ford and Chrysler - has validated the capabilities and economic benefits of the system. Although this technology has been adopted in a number of stamping operations, one of the primary barriers to faster adoption and application of this technology in HSS projects is system cost. The cost issue has surfaced because the systems currently in use are built for each individual die as a custom application, thus driving higher tooling costs. This project proposed to better marry the die-specific Force Modulator technology with stamping presses in the form of a press cushion. This system would be designed to operate the binder ring for multiple parts, thus cutting the per-die cost of the technology. This study reports the results of technology field application. This project produced the following conclusions: (1) The Force Modulator system is capable of operating at very high tempos in the stamping environment; (2) The company can generate substantial, controlled holding tonnage (binder ring pressure) necessary to hold high strength steel parts for proper formation during draw operations; (3) A single system can be designed to operate with a family of parts, thus significantly reducing the per-die cost of a FM system; (4) High strength steel parts made with these systems appear to show significant quality improvements; (5) The amounts of steel required to make these parts is typically less than the amounts required with traditional blank-holding technologies; and (6) This technology will aid in the use of higher strength steels in auto and truck production, thus reducing weight and improving fuel efficiency.

Redmond Clark

2009-04-30T23:59:59.000Z