Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Independent transmission system operators and their role in maintaining reliability in a restructured electric power industry  

Science Conference Proceedings (OSTI)

This report summarizes the current status of proposals to form Independent System Operators (ISOs) to operate high-voltage transmission systems in the United States and reviews their potential role in maintaining bulk power system reliability. As background information, the likely new industry structure, nature of deregulated markets, and institutional framework for bulk power system reliability are reviewed. The report identifies issues related to the formation of ISOs and their roles in markets and in reliability, and describes potential policy directions for encouraging the formation of effective ISOs and ensuring bulk system reliability. Two appendices are provided, which address: (1) system operation arrangements in other countries, and (2) summaries of regional U.S. ISO proposals.

NONE

1998-01-01T23:59:59.000Z

2

FOR ELECTRIC POWER TRANSMISSION  

E-Print Network (OSTI)

A contract network extends the concept of a contract path to address the problem of loop flow and congestion in electric power transmission systems. A contract network option provides a well defined, internally consistent framework for assigning long-term capacity rights to a complicated electric transmission network. The contract network respects the special conditions induced by Kirchoff's Laws; accommodates thermal, voltage and contingency constraints on transmission capacity; and can be adopted without disturbing existing methods for achieving an economic power dispatch subject to these constraints. By design, a contract network would maintain short-run efficiency through optimal spot price determination of transmission prices. Through payment of congestion rentals, the contract network makes a long-term capacityright holder indifferent between delivery of the power or receipt of payments in a settlement system. And the contract network framework can support allocation of transmission capacity rights through a competitive bidding process. CONTRACT NETWORKS

William W. Hogan; William W. Hogan

1990-01-01T23:59:59.000Z

3

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

4

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

5

Regulations for Electric Transmission and Fuel Gas Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long...

6

Electric Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

7

Electricity Transmission and Distribution Technologies ...  

Electricity Transmission and Distribution Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research ...

8

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

9

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

10

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest...

11

Electricity Transmission, A Primer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the electric power system, 2) gives electricity customers flexibility to diversify the mix of fuels that produces their electricity by giving them access to power plants, 3)...

12

Electrical transmission line diametrical retainer  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

13

National Electric Transmission Congestion Studies  

Energy.gov (U.S. Department of Energy (DOE))

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission...

14

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis...

15

Electric generating or transmission facility: determination of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric generating or transmission facility: determination of rate-making principles and treatment: procedure (Kansas) Electric generating or transmission facility: determination...

16

Today's electrical transmission system delivers high levels of  

E-Print Network (OSTI)

for electricity demand that reliability be maintained as we transition to clean electricity generation- ated and delivered to electric loads. Clean Energy Transmission and Reliability Energy Storage Smart a smarter, mod- ern grid. Through the Distrib- uted Energy Communication & Control (DECC) facility, re

17

DOE National Interest Electric Transmission Corridors Conference  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Interest Electric Transmission Corridors Conference March 29, 2006 Hilton Garden Hotel Chicago, IL William H. Whitehead General Manager, Transmission Strategy PJM...

18

Casablanca Carlos American Electric Power Transmission Owner  

E-Print Network (OSTI)

(Facilitator) Chantal PJM Interconnection Not Applicable Horstmann John Dayton Power & Light Company (The) Transmission Owner Issermoyer John PPL Electric Utilities Corp. dba PPL Utilities Transmission Owner

Pjm Interconnection Llc; Teleconference Webex Participants; Firstenergy Solutions; Corp Transmission Owner; Boltz Jeff; Firstenergy Solutions; Corp Transmission Owner; Fecho Thomas; Indiana Michigan; Power Company; Transmission Owner; Patten Kevin; Company Transmission Owner

2012-01-01T23:59:59.000Z

19

Michigan Electric Transmission Company | Open Energy Information  

Open Energy Info (EERE)

Transmission Company Jump to: navigation, search Name Michigan Electric Transmission Company Place Michigan Utility Id 56163 Utility Location Yes Ownership T NERC RFC Yes ISO MISO...

20

Electric Power Generation and Transmission (Iowa) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Generation and Transmission (Iowa) Electric Power Generation and Transmission (Iowa) < Back Eligibility Agricultural Industrial Investor-Owned Utility MunicipalPublic...

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

22

Installing and Maintaining a Small Wind Electric System | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System July 2, 2012 - 8:22pm Addthis Installing and Maintaining a Small Wind Electric System What does this mean for me? When installing a wind system, the location of the system, the energy budget for the site, the size of the system, and the height of the tower are important elements to consider. Deciding whether to connect the system to the electric grid or not is also an important decision. If you went through the planning steps to evaluate whether a small wind electric system will work at your location, you will already have a general idea about: The amount of wind at your site The zoning requirements and covenants in your area The economics, payback, and incentives of installing a wind system

23

PP-76 The Vermont Electric Transmission Company | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 The Vermont Electric Transmission Company PP-76 The Vermont Electric Transmission Company Presidential Permit authorizing The Vermont Electric Transmission Company to construct,...

24

PP-76-1 The Vermont Electric Transmission Company | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76-1 The Vermont Electric Transmission Company PP-76-1 The Vermont Electric Transmission Company Presidential Permit authorizing The Vermont Electric Transmission Company to...

25

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

26

Installing and Maintaining a Home Solar Electric System | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System July 2, 2012 - 8:21pm Addthis When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. How does it work? Making sure your home solar electric or PV system is sized, sited, and installed correctly is essential for maximizing its energy performance. As with any mechanical or electrical appliance, PV systems require routine, periodic maintenance.

27

Installing and Maintaining a Home Solar Electric System | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System Installing and Maintaining a Home Solar Electric System July 2, 2012 - 8:21pm Addthis When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. When choosing a contractor, ask about their work record, experience, and licenses, and get more than one bid for the installation of your PV system. | Photo courtesy of Dennis Schroeder, NREL. How does it work? Making sure your home solar electric or PV system is sized, sited, and installed correctly is essential for maximizing its energy performance. As with any mechanical or electrical appliance, PV systems require routine, periodic maintenance.

28

2009 National Electric Transmission Congestion Study - Hartford...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hartford Workshop 2009 National Electric Transmission Congestion Study - Hartford Workshop On July 9, 2008, DOE hosted a regional pre-study workshop in Hartford, CT to receive...

29

2012 National Electric Transmission Congestion Study - Philadelphia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Workshop 2012 National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA...

30

2009 National Electric Transmission Congestion Study - Oklahoma...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Oklahoma City Workshop 2009 National Electric Transmission Congestion Study - Oklahoma City Workshop On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City,...

31

Coordination of Federal Authorizations for Electric Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy...

32

Comments of New England Electric Transmission Corporation on...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and...

33

Transmission INTRODUCTION  

E-Print Network (OSTI)

Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing to maintain control over the transmission system can result in failure of the entire electrical system of supply, demand, and transmission capability. Transmission system operators are primarily responsible

34

Comments of New England Electric Transmission Corporation on Proposed Open  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New England Electric Transmission Corporation on New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Motion to intervene out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and New England Power Company. Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities FE Docket No 99-1 (PP-76/EA-76) More Documents & Publications Ontario Power Generation Motion to Intervene & Comments in FE Docket No.

35

Gap junction-mediated electrical transmission: Regulatory mechanisms and plasticity  

E-Print Network (OSTI)

Gap junction-mediated electrical transmission: Regulatory mechanisms and plasticity Alberto E of synaptic transmission: chemical and electrical. While most efforts have been dedicated to the understanding of synaptic transmission: chemical and electrical. In chemical synapses, presynaptic electrical currents

Rash, John E.

36

Coordination of Federal Authorizations for Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordination of Federal Authorizations for Electric Transmission Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy ("DOE") for its ongoing commitment to implement the provisions of the Energy Policy Act of 2005 ("EPAct"), specifically, as addressed here, the DOE's continuing effort to establish procedures under which entities may request that DOE coordinate Federal authorizations for the siting of interstate transmission facilities. Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule

37

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(including regional diversity, AC-DC transmission and distribution solutions, microgrids, energy storage, and centralized-decentralized control) * Accommodates two-way flows...

38

Electric Companies and Electric Transmission Lines (North Dakota) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Companies and Electric Transmission Lines (North Dakota) Electric Companies and Electric Transmission Lines (North Dakota) Electric Companies and Electric Transmission Lines (North Dakota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State North Dakota Program Type Line Extension Analysis The Public Service Commission has the authority to regulate the

39

Electric Transmission Lines (Nebraska) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nebraska) Nebraska) Electric Transmission Lines (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Siting and Permitting Provider Public Service Commission The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway

40

Electrical Effects of HVDC Transmission Lines  

Science Conference Proceedings (OSTI)

High-voltage direct current (HVDC) transmission lines are used to transmit large amounts of power over long distances. The Electric Power Research Institute (EPRI) and others have produced many publications over approximately the past three decades, expounding on this topic. Several HVDC transmission lines have been built and have been in operation around the world over that period, and recently, there has been increased interest in the advantages that HVDC transmission affords. HVDC lines, like high-vol...

2010-12-23T23:59:59.000Z

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

2009 National Electric Transmission Congestion Study - Atlanta Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Atlanta 2009 National Electric Transmission Congestion Study - Atlanta Workshop 2009 National Electric Transmission Congestion Study - Atlanta Workshop On July 29, 2008, DOE hosted a regional pre-study workshop in Atlanta, GA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript are available below. 7-29-08 Congestion Workshop Agenda - Atlanta, GA.pdf Transcript - 2009 National Electric Transmission Congestion Study Atlanta Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2012 National Electric Transmission Congestion Study - St. Louis Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop

42

DOE Issues Two Draft National Interest Electric Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Two Draft National Interest Electric Transmission Corridor Designations DOE Issues Two Draft National Interest Electric Transmission Corridor Designations U.S....

43

National Electric Transmission Congestion Study 2006 Area Maps  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission National Electric Transmission Congestion Study Congestion Study Congestion Area Maps Congestion Area Maps U.S. Department of Energy U.S. Department of Energy...

44

Electricity Transmission Congestion Costs: A Review of Recent...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Transmission Congestion Costs: A Review of Recent Reports Electricity Transmission Congestion Costs: A Review of Recent Reports This study reviews reports of congestion...

45

2006 National Electric Transmission Congestion Study and Related...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion Electric Transmission Study, required by section...

46

Electric Power Transmission and Distribution (EPTD) Smart Grid...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New York) Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New York) < Back...

47

DOE EAC Electricity Adequacy Report. CHAPTER 4: Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CHAPTER 4: Transmission Adequacy. October 17, 2008 DRAFT DOE EAC Electricity Adequacy Report. CHAPTER 4: Transmission Adequacy. October 17, 2008 DRAFT A robust interstate electric...

48

The Electric Transmission Network: A Multi-Region Analysis  

U.S. Energy Information Administration (EIA)

Modeling and Analysis Papers>The Electric Transmission Network: A Multi-Region Analysis : The Electric Transmission Network: A Multi-Region Analysis

49

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

50

2012 National Electric Transmission Congestion Study - Philadelphia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Philadelphia Workshop 2012 National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Eastern Workshops.pdf 12-06-11 Congestion Workshop Agenda - Philadelphia (final).pdf Introduction by David Meyer, DOE.pdf Presentation by Edward Finley, NCUC.pdf Presentation by Betty Ann Kane, DC PSC.pdf Presentation by Robert Bradish, American Electric Power.pdf Presentation by John Buechler, NYISO.pdf Presentation by Jim Busbin, Southern Company.pdf

51

Landscape Fragmentation and Electric Transmission Corridor Siting and Management  

Science Conference Proceedings (OSTI)

This report discusses landscape fragmentation and electric transmission corridor siting and management.

2003-12-04T23:59:59.000Z

52

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Electric Transmission Congestion Study 9 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

53

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

54

Cellular/Molecular Connexin35 Mediates Electrical Transmission at Mixed  

E-Print Network (OSTI)

Cellular/Molecular Connexin35 Mediates Electrical Transmission at Mixed Synapses on Mauthner Cells regions, suggesting that connexin35-mediated electrical transmission is common in goldfish brain" (electrical and chemical) synaptic terminals that offer the unique opportunity to correlate physiological

Rash, John E.

55

DOE EAC Electricity Adequacy Report. Transmission Section - September 15,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Section - Transmission Section - September 15, 2008 DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 There is a critical need to upgrade the nation's electric transmission grid. Two reasons in particular drive this need. First, increasing transmission capability will help ensure a reliable electric supply and provide greater access to economically-priced power. Second, with the growth in state-adopted renewable performance standards (RPS) and the increasing possibility of a national RPS, significant new transmission, much of it interregional, is needed to access renewable resources. DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 More Documents & Publications DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT-

56

DOE Affirms National Interest Electric Transmission Corridor Designations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations. The U.S. Department of Energy (DOE) today denied requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as areas of significant electricity congestion and constraint. The designation of national corridors was made in accordance with the Energy Policy Act of 2005 (EPAct). DOE Affirms National Interest Electric Transmission Corridor Designations More Documents & Publications DOE Designates Southwest Area and Mid-Atlantic Area National Interest

57

DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Chapter DRAFT- September 18, 2008 DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 The purpose of this document is to seed...

58

Electrical Characterization of Textile Transmission Lines  

E-Print Network (OSTI)

In this paper, electrical characterization and modeling of conductive textiles are presented. A dedicated measurement setup has been developed to allow reliable connection of the textile samples with the equipment cables. Geometrical fabric structures and fabrication tolerances as well as high frequency properties up to 6 GHz for four types of textiles have been determined. Transmission lines with controlled characteristic impedance have been realized enabling the characterization of typical line attenuation factors. This work shows that textile transmission lines can be used for frequencies up to 1.2 GHz and 120 MHz with the maximal lengths of 10 and 100 cm, respectively. Index Terms---Attenuation constants, characteristic impedance, conductive textiles, transmission lines, wearable computing.

Didier Cottet; Janusz Grzyb; Student Member; Student Member; Tünde Kirstein; Gerhard Tröster; Senior Member

2003-01-01T23:59:59.000Z

59

2006 National Electric Transmission Congestion Study and Related Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study and Related 6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints and identifies areas that are transmission-constrained. This is the first Congestion Study the Department conducted. Based on this study, two National Interest Electric Transmission Corridors were designated in 2007. They were invalidated by a federal appeals court in 2011. Comments and form letters were submitted by the public in response to this study. National Electric Transmission Congestion Study 2006 Executive Summary Full Text of the National Electric Transmission Congestion Study 2006

60

FACT SHEET: Designation of National Interest Electric Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FACT SHEET: Designation of National Interest Electric Transmission Corridors,As Authorized by the Energy Policy Act of 2005 FACT SHEET: Designation of National Interest Electric...

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Electric vehicle drive train with direct coupling transmission ...  

An electric vehicle drive train includes an electric motor and an associated speed sensor, a transmission operable in a speed reduction mode or a direct coupled mode ...

62

Electricity Transmission in a Restructured Industry: Data Needs ...  

U.S. Energy Information Administration (EIA)

Electricity Transmission in a Restructured Industry: ... as is now happening in the electricity industry, alters the basic data needed to describe that industry.

63

How much electricity is lost in transmission and distribution in ...  

U.S. Energy Information Administration (EIA)

... is electricity that is generated at facilities that is not put onto the electricity transmission and distribution grid, ... How many smart meters are installed in ...

64

Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission  

E-Print Network (OSTI)

Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission Summary of Key..................................................................................................................................... 1 Northwest Transmission Planning), there was concern that there had been little progress on addressing the developing transmission issues in the region

65

2009 National Electric Transmission Congestion Study - Las Vegas Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Las Vegas 2009 National Electric Transmission Congestion Study - Las Vegas Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop On August 6, 2008, DOE hosted a regional pre-study workshop in Las Vegas, NV to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript available below. 8-06-08 Congestion Workshop Agenda - Las Vegas, NV.pdf Transcript - 2009 National Electric Transmission Congestion Study Las Vegas Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop 2012 National Electric Transmission Congestion Study - San Diego Workshop

66

Maintaining electric power system performance: Preparing for the year 2020: Research needs  

DOE Green Energy (OSTI)

The US electric power delivery system will undergo dramatic changes between now and the year 2020. Without an aggressive research and development (R&D) program to develop and integrate new technologies, a substantial mismatch could develop between the system`s performance and the public`s expectations for a stable, reliable source of energy. This report provides a perspective on the future US electrical power delivery system and outlines the major issues for R&D support that will be required to maintain the performance of the system successfully through the year 2020. To define the R&D needs in the electric utility sector, the US Department of Energy (DOE) Office of Energy Management under the Assistant Secretary for Conservation and Renewable Energy, in participation with the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA), met with electric utility industry leaders in Denver, Colorado, on March 19 and 20, 1990. The major areas that require increased R&D in order to meet the challenges of system needs by the year 2020 include the following: Effects of exposure to electric and magnetic fields (EMFs), real-time power system control, higher-capacity transmission options, high capacity power electronics, and energy storage. An electric energy delivery system that reliably supplies sufficient electric power at the lowest possible cost to meet the nation`s needs is vital to the economic health of the US. In order to meet the challenges facing the national supply and delivery of electric power in the future, all parties concerned with the R&D of supply and delivery technologies for electric energy must cooperate and must seek to leverage the limited funds available.

Dale, S.J.; Stovall, J.P. [Oak Ridge National Lab., TN (United States); Klein, K.W. [Energetics, Inc., Washington, DC (United States)

1991-11-01T23:59:59.000Z

67

Maintaining electric power system performance: Preparing for the year 2020: Research needs  

DOE Green Energy (OSTI)

The US electric power delivery system will undergo dramatic changes between now and the year 2020. Without an aggressive research and development (R D) program to develop and integrate new technologies, a substantial mismatch could develop between the system's performance and the public's expectations for a stable, reliable source of energy. This report provides a perspective on the future US electrical power delivery system and outlines the major issues for R D support that will be required to maintain the performance of the system successfully through the year 2020. To define the R D needs in the electric utility sector, the US Department of Energy (DOE) Office of Energy Management under the Assistant Secretary for Conservation and Renewable Energy, in participation with the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA), met with electric utility industry leaders in Denver, Colorado, on March 19 and 20, 1990. The major areas that require increased R D in order to meet the challenges of system needs by the year 2020 include the following: Effects of exposure to electric and magnetic fields (EMFs), real-time power system control, higher-capacity transmission options, high capacity power electronics, and energy storage. An electric energy delivery system that reliably supplies sufficient electric power at the lowest possible cost to meet the nation's needs is vital to the economic health of the US. In order to meet the challenges facing the national supply and delivery of electric power in the future, all parties concerned with the R D of supply and delivery technologies for electric energy must cooperate and must seek to leverage the limited funds available.

Dale, S.J.; Stovall, J.P. (Oak Ridge National Lab., TN (United States)); Klein, K.W. (Energetics, Inc., Washington, DC (United States))

1991-11-01T23:59:59.000Z

68

Transmission and Generation Investment In a Competitive Electric Power Industry  

E-Print Network (OSTI)

PWP-030 Transmission and Generation Investment In a Competitive Electric Power Industry James;PWP-030 Transmission and Generation Investment In a Competitive Electric Power Industry James Bushnell. Transmission and Generation Investment In a Competitive Electric Power Industry James Bushnell and Steven Stoft

California at Berkeley. University of

69

Electricity generation with looped transmission networks: Bidding to an ISO  

E-Print Network (OSTI)

Electricity generation with looped transmission networks: Bidding to an ISO Xinmin Hu Daniel Ralph to model markets for delivery of electrical power on looped transmission networks. It analyzes in transmission capacity mean the ISO potentially sets a different electricity price at each node of the trans

Ferris, Michael C.

70

VULNERABILITY OF BLUETOOTH TO IMPULSIVE NOISE IN ELECTRICITY TRANSMISSION SUBSTATIONS  

E-Print Network (OSTI)

VULNERABILITY OF BLUETOOTH TO IMPULSIVE NOISE IN ELECTRICITY TRANSMISSION SUBSTATIONS S A Bhattil environment of an Electricity transmission substation environment is modelled as a Symmetric Alpha Stable of an electricity transmission substation. I. INTRODUCTION In industrial environments, Supervisor Control and Data

Atkinson, Robert C

71

10 Year Transmission Plan for the Western Electricity Interconnection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

72

2006 National Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study 6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor). Based on the 2006 study, two National Interest Electric Transmission Corridors were designated in 2007. These were invalidated by a federal appeals court in

73

Transmission rights and market power on electric power networks  

E-Print Network (OSTI)

We analyze whether and how the allocation of transmission rights associated with the use of electric power networks affects the behavior of electricity generators and electricity consumers with market power. We consider ...

Joskow, Paul L.

2000-01-01T23:59:59.000Z

74

KRS Chapter 278: Electric Generation and Transmission Siting (Kentucky) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KRS Chapter 278: Electric Generation and Transmission Siting KRS Chapter 278: Electric Generation and Transmission Siting (Kentucky) KRS Chapter 278: Electric Generation and Transmission Siting (Kentucky) < Back Eligibility Commercial Developer Investor-Owned Utility Municipal/Public Utility Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Kentucky Program Type Environmental Regulations Provider Kentucky Public Service Commission No person shall commence to construct a merchant electric generating facility until that person has applied for and obtained a construction certificate for the facility from the Kentucky State Board on Electric Generation and Transmission. The construction certificate shall be valid

75

Public Comments on the National Electric Transmission Congestion Study 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on the National Electric Transmission Congestion Comments on the National Electric Transmission Congestion Study 2012 Public Comments on the National Electric Transmission Congestion Study 2012 The Department issued a Federal Register Notice initiating preparations for development of the 2012 National Electric Transmission Congestion Study. DOE requested comments on what publicly-available data and information should be considered, and what types of analysis should be performed to identify and understand the significance and character of transmission congestion. The following public comments were received as of March 30, 2012, in response to the 2012 study. DOE appreciates the comments that various individuals and organizations submitted. Comments were received from these organizations, listed alphabetically.

76

DOE Action Plan Addressing the Electricity Transmission System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. DEPARTMENT OF ENERGY U.S. DEPARTMENT OF ENERGY ACTION PLAN ADDRESSING THE ELECTRICITY TRANSMISSION SYSTEM ~DRAFT~ DOE Action Plan Addressing the Electricity Transmission System 1 Table of Contents * INTRODUCTION ................................................................................................................... 2 The Grid Tech Team ...................................................................................................... 2 Focus on Transmission .................................................................................................. 3 Roadmap Goals ............................................................................................................. 4 * PROCESS OVERVIEW ........................................................................................................... 5

77

TRANSMISSION EFFECTS IN MARKET POWER ANALYSIS OF ELECTRICITY MARKETS  

E-Print Network (OSTI)

TRANSMISSION EFFECTS IN MARKET POWER ANALYSIS OF ELECTRICITY MARKETS Thomas J. Overbye George Gross, congestion, merger analysis, PTDF 1. INTRODUCTION The electric power industry throughout the world of the impact that the electrical transmission system has on the analysis market power opportunities

Gross, George

78

Gap junction-mediated electrical transmission: Regulatory mechanisms and plasticity  

E-Print Network (OSTI)

Gap junction-mediated electrical transmission: Regulatory mechanisms and plasticity Alberto E of synaptic transmission: chemical and electrical. While most efforts have been dedicated to the understanding in revised form 16 May 2012 Accepted 23 May 2012 Available online 31 May 2012 Keywords: Electrical synapse

Rash, John E.

79

Updating the Electric Grid: An Introduction to Non-Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

80

Updating the Electric Grid: An Introduction to Non-Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

2009 National Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 National Electric Transmission Congestion Study 9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor). The 2009 study is the second Congestion Study that the Department conducted. The first Congestion Study was conducted in 2006. Preparations

82

DEPARTMENT OF ENERGY National Electric Transmission Congestion Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Report National Electric Transmission Congestion Report [Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02, Southwest Area National Interest Electric Transmission Corridor] AGENCY: Department of Energy. ACTION: Order Denying Rehearing. SUMMARY: On October 5,2007, the Department of Energy (Department or DOE) published in the Federal Register a National Electric Transmission Congestion Report and Order (Report and Order) in the above dockets in which it designated the Mid- Atlantic Area and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) (72 FR 56992). Numerous parties in each of the above named dockets filed timely applications for rehearing of DOE's Report and Order. Some parties

83

Designation of National Interest Electric Transmission Bottlenecks (NIETB)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary of Comments Summary of Comments Designation of National Interest Electric Transmission Bottlenecks (NIETB) Summary of Comments The US Department of Energy (DOE) issued a Federal Register Notice of Inquiry [FR doc. 04-16724] on July 22, 2004, which solicited comments related to the Designation of National Interest Transmission Bottlenecks (NIETB). The 60-day comment period ended on September 21, 2004. Forty-seven comments were received in response to the Notice of Inquiry. Designation of National Interest Electric Transmission Bottlenecks (NIETB) Summary of Comments More Documents & Publications Comments to the Designation of National Interest Transmission Bottlenecks (NIETB) Notice of Inquiry Designation of National Interest Electric Transmission Bottlenecks (NIETB)

84

DOE Issues Two Draft National Interest Electric Transmission Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues Two Draft National Interest Electric Transmission Issues Two Draft National Interest Electric Transmission Corridor Designations DOE Issues Two Draft National Interest Electric Transmission Corridor Designations April 26, 2007 - 10:58am Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the issuance of two draft National Interest Electric Transmission Corridor (National Corridor) designations. The Energy Policy Act of 2005 authorizes the Secretary, based on the findings of DOE's National Electric Transmission Congestion Study (Congestion Study), to designate National Corridors. "These draft designations set us on the path to modernize our constrained and congested electric power infrastructure. They are a crucial step toward realizing President Bush's goal of a modern, more efficient electric

85

Electricity Transmission Data Needs Focus Group Results  

U.S. Energy Information Administration (EIA)

power, transmission flows within states, the implications of transmission on capacity expansion decisions and costs; age of transformers and other facilities;

86

DOE Issues Two Draft National Interest Electric Transmission Corridor Designations  

Energy.gov (U.S. Department of Energy (DOE))

WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the issuance of two draft National Interest Electric Transmission Corridor (National Corridor)...

87

Electricity Transmission Congestion Costs: A Review of Recent Reports |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Transmission Congestion Costs: A Review of Recent Electricity Transmission Congestion Costs: A Review of Recent Reports Electricity Transmission Congestion Costs: A Review of Recent Reports This study reviews reports of congestion costs and begins to assess their implications for the current national discussion on the importance of the U.S. electricity transmission system for enabling competitive wholesale electricity markets. As a guiding principle, we posit that a more robust electricity system could reduce congestion costs; and thereby, 1) facilitate more vibrant and fair competition in wholesale electricity markets, and 2)enable consumers to seek out the lowest prices for electricity. Yet, examining the details suggests that, sometimes, there will be trade-offs between these goals. Therefore, it is

88

Florida Electric Transmission Line Siting Act (Florida) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Act (Florida) Electric Transmission Line Siting Act (Florida) Florida Electric Transmission Line Siting Act (Florida) < Back Eligibility Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection The Transmission Line Siting Act (TLSA) is the state's centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15 miles or longer. An

89

2006 National Electric Transmission Congestion Study Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study Federal 6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The Federal Register Notice of Inquiry requesting comments and providing notice of a technical conference for the 2006 National Electric Transmission Congestion Study was issued February 2, 2006. February 2, 2006 Federal Register Notice of Inquiry Comments to the Feb 06 FRN received as of March 9, 2006 Comments to the Feb 06 FRN received after March 9, 2006 More Documents & Publications Proceedings of the March 29, 2006 Conference for the 2006 National Electric Transmission Congestion Study - Session 2 Proceedings of the March 29, 2006 Conference for the 2006 National Electric

90

2009 National Electric Transmission Congestion Study - Hartford Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Hartford 2009 National Electric Transmission Congestion Study - Hartford Workshop 2009 National Electric Transmission Congestion Study - Hartford Workshop On July 9, 2008, DOE hosted a regional pre-study workshop in Hartford, CT to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 7-09-08 Congestion Workshop Agenda - Hartford, CT.pdf Transcript - 2009 National Electric Transmission Congestion Study Hartford Workshop.pdf Comments of the New York Independent System Operator, submitted at 2009 Congestion Study Hartford workshop_0.pdf Prepared Remarks of Brian Forshaw, Connecticut Municipal Electric Energy Cooperative, submitted at 2009 Congestion Study Hartford workshop_0.pdf

91

DOE Affirms National Interest Electric Transmission Corridor Designations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today denied requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as areas of significant electricity congestion and constraint. The designation of national corridors was made in accordance with the Energy Policy Act of 2005 (EPAct). In affirming the National Corridor designations today, DOE dismissed as being without merit challenges raised by the applicants for rehearing, citing extensive data analysis conducted in its 2006 National Interest Electric Transmission

92

Transmission Asset Investment in Electricity Markets Javier Contreras1  

E-Print Network (OSTI)

Transmission Asset Investment in Electricity Markets Javier Contreras1 and George Gross2 Abstract: We construct a general analytic framework for the transmission network investment problem in the evaluation of the impacts of new transmission investments under competition. The proposed metrics are useful

Gross, George

93

Electric Transmission Rights-of-Way Uses and Risks  

Science Conference Proceedings (OSTI)

Significant societal and economic benefits accrue through multiple uses of electric transmission rights-of-way (ROWs). Authorization of multiple ROW uses, however, has the potential to be detrimental to the safe, reliable transmission of electricity. Understanding benefits and risks will help utilities evaluate the myriad of current and potential ROW uses, establish effective protocols, and identify the best opportunities for expanding ROW uses.

2004-12-15T23:59:59.000Z

94

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners  

Energy.gov (U.S. Department of Energy (DOE))

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

95

Category:Smart Grid Projects - Electric Transmission Systems | Open Energy  

Open Energy Info (EERE)

Transmission Systems category. Transmission Systems category. Pages in category "Smart Grid Projects - Electric Transmission Systems" The following 10 pages are in this category, out of 10 total. A American Transmission Company LLC II Smart Grid Project American Transmission Company LLC Smart Grid Project D Duke Energy Carolinas, LLC Smart Grid Project E Entergy Services, Inc. Smart Grid Project I ISO New England, Incorporated Smart Grid Project M Midwest Energy Inc. Smart Grid Project Midwest Independent Transmission System Operator Smart Grid Project N New York Independent System Operator, Inc. Smart Grid Project P PJM Interconnection, LLC Smart Grid Project W Western Electricity Coordinating Council Smart Grid Project Retrieved from "http://en.openei.org/w/index.php?title=Category:Smart_Grid_Projects_-_Electric_Transmission_Systems&oldid=214227

96

Notice of Technical Workshop in Support of 2009 Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Technical Workshop in Support of 2009 Electric Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 The Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) conducted a Technical Workshop to receive input from subject matter experts on the historical transmission data in the Western and Eastern Interconnections and on studies of future transmission projections within the two Interconnections. Technical Workshop in Support of 2009 Electric Transmission Congestion Study - Federal Register Vol 74 No. 32 - Feb. 19, 2009.pdf More Documents & Publications

97

Coordinating Interstate ElectricTransmission Siting: An Introduction to the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate ElectricTransmission Siting: An Coordinating Interstate ElectricTransmission Siting: An Introduction to the Debate Coordinating Interstate ElectricTransmission Siting: An Introduction to the Debate In recent years, experts have started drawing att ention to the need to improve the system that transmits electricity from power plants to demand centers. Congestion on existing lines, increased energy demand that suggests a need for new electric transmission and the challenge of connecting renewable energy sources to load centers highlight some needs that could be underserved by the existing system in the near future. While improved demand-side management (including energy effi ciency and demand response), bett er utilization of the existing transmission grid, and other strategies (such as distributed

98

Notice of Technical Workshop in Support of 2009 Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Technical Workshop in Support of 2009 Electric Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 The Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) conducted a Technical Workshop to receive input from subject matter experts on the historical transmission data in the Western and Eastern Interconnections and on studies of future transmission projections within the two Interconnections. Technical Workshop in Support of 2009 Electric Transmission Congestion Study - Federal Register Vol 74 No. 32 - Feb. 19, 2009.pdf More Documents & Publications

99

2009 National Electric Transmission Congestion Study - Chicago Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chicago Chicago Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop On September 17, 2008, DOE hosted a regional pre-study workshop in Chicago, IL to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 9-17-08 Congestion Workshop Agenda - Chicago, IL.pdf Transcript - 2009 National Electric Transmission Congestion Study Chicago Workshop.pdf Statement of Michael J. Kormos, PJM Interconnection, submitted at 2009 Congestion Study Chicago workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop

100

Electricity transmission congestion costs: A review of recent reports  

SciTech Connect

Recently, independent system operators (ISOs) and others have published reports on the costs of transmission congestion. The magnitude of congestion costs cited in these reports has contributed to the national discussion on the current state of U.S. electricity transmission system and whether it provides an adequate platform for competition in wholesale electricity markets. This report reviews reports of congestion costs and begins to assess their implications for the current national discussion on the importance of the U.S. electricity transmission system for enabling competitive wholesale electricity markets. As a guiding principle, we posit that a more robust electricity system could reduce congestion costs; and thereby, (1) facilitate more vibrant and fair competition in wholesale electricity markets, and (2) enable consumers to seek out the lowest prices for electricity. Yet, examining the details suggests that, sometimes, there will be trade-offs between these goals. Therefore, it is essential to understand who pays, how much, and how do they benefit in evaluating options (both transmission and non-transmission alternatives) to address transmission congestion. To describe the differences among published estimates of congestion costs, we develop and motivate three ways by which transmission congestion costs are calculated in restructured markets. The assessment demonstrates that published transmission congestion costs are not directly comparable because they have been developed to serve different purposes. More importantly, critical information needed to make them more comparable, for example in order to evaluate the impacts of options to relieve congestion, is sometimes not available.

Lesieutre, Bernard C.; Eto, Joseph H.

2003-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

NREL: Transmission Grid Integration - Electricity Market Design  

NLE Websites -- All DOE Office Websites (Extended Search)

Electricity Market Design Researchers at NREL are studying electricity market designs to find ways to better accommodate variable renewable energy resources and maximize...

102

2009 National Electric Transmission Congestion Study Workshops | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Technology Development » Transmission Planning » Services » Technology Development » Transmission Planning » Congestion Studies » 2009 Congestion Study » 2009 National Electric Transmission Congestion Study Workshops 2009 National Electric Transmission Congestion Study Workshops DOE hosted six regional pre-study workshops in mid-2008 to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study, including comments on practical metrics for gauging levels and significance of transmission congestion. Each workshop featured a panel of invited speakers to present their views and comments. For details, including agendas, transcripts, and documents submitted for consideration for the 2009 study, please select a workshop, below. June 11, 2008 San Francisco, CA June 18, 2008 Oklahoma City, OK

103

Electrical Effects of HVDC Transmission Lines  

Science Conference Proceedings (OSTI)

Electrical effects can constrain the design of prospective high-voltage direct current (HVDC) lines operating either alone or sharing the same rights of way structures with high-voltage alternate current (HVAC) lines. In 2013, the Electric Power Research Institute (EPRI) research on HVDC electrical effects focused on electric field and ion density at ground level. The ultimate goal of the project is to calculate with confidence these electrical effects. The algorithms on which the software currently ...

2013-11-08T23:59:59.000Z

104

Trends In U.S. Electric Power Transmission  

SciTech Connect

The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

NONE

2007-11-15T23:59:59.000Z

105

2009 National Electric Transmission Congestion Study - Chicago Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chicago Chicago Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop On September 17, 2008, DOE hosted a regional pre-study workshop in Chicago, IL to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 9-17-08 Congestion Workshop Agenda - Chicago, IL.pdf Transcript - 2009 National Electric Transmission Congestion Study Chicago Workshop.pdf Statement of Michael J. Kormos, PJM Interconnection, submitted at 2009 Congestion Study Chicago workshop.pdf More Documents & Publications Blackout 2003: Electric System Working Group Technical Conference - Comments and Recommendations 2009 National Electric Transmission Congestion Study - San Francisco

106

Electric generating or transmission facility: determination of rate-making  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric generating or transmission facility: determination of Electric generating or transmission facility: determination of rate-making principles and treatment: procedure (Kansas) Electric generating or transmission facility: determination of rate-making principles and treatment: procedure (Kansas) < Back Eligibility Municipal/Public Utility Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Kansas Program Type Generating Facility Rate-Making Provider Kansas Corporation Commission This legislation permits the KCC to determine rate-making principles that will apply to a utility's investment in generation or transmission before constructing a facility or entering into a contract for purchasing power. There is no restriction on the type or the size of electric generating unit

107

Electrical Effects of HVDC Transmission Lines--2012  

Science Conference Proceedings (OSTI)

Electrical effects may constrain the design of prospective high-voltage direct current (HVDC) lines, when either alone or sharing the same structures with high-voltage alternating current (HVAC) lines. In 2012, the Electric Power Research Institute (EPRI) research focused on electric field and ion density at ground level. The ultimate goal is to calculate with confidence these electrical effects. The work built on research previously performed, including pioneering research performed at EPRI’s ...

2012-12-12T23:59:59.000Z

108

Exotic Electricity Options and the Valuation of Electricity Generation and Transmission  

E-Print Network (OSTI)

Exotic Electricity Options and the Valuation of Electricity Generation and Transmission Assets a methodology for valuing electricity deriva- tives by constructing replicating portfolios from electricity-storable nature of electricity, which rules out the traditional spot mar- ket, storage-based method of valuing

109

Optimal Transmission Switching in Electric Networks for Improved Economic Operations1  

E-Print Network (OSTI)

1 Optimal Transmission Switching in Electric Networks for Improved Economic Operations1 Emily. Abstract Growing demand for electric power seems to necessitate new transmission lines, but obstacles" bulk electric grid, one that is more controllable and flexible. Optimal transmission switching

Ferris, Michael C.

110

2012 National Electric Transmission Congestion Study Workshops | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Planning » Transmission Planning » Congestion Studies » 2012 National Electric Transmission Congestion Study Workshops 2012 National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. For details, please select a workshop, below. Agendas, presentations, and transcripts are available on the individual workshop pages; please select a workshop from the list below. Note: The November 10, 2011 Federal Register notice incorrectly stated that the four regional workshops would be simulcast over the Internet and that advanced registration for the Webcasts was required. The workshops were not simulcast. The Department requested, but did not require, those who

111

Electricity Transmission System Workshop: EERE Issues and Opportunities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Transmission System Electricity Transmission System Workshop: EERE Issues and Opportunities November 1, 2012 Dr. David Danielson Assistant Secretary for the Office of Energy Efficiency and Renewable Energy eere.energy.gov "If you can't solve a problem, expand it." - Dwight D. Eisenhower eere.energy.gov eere.energy.gov Stationary Energy Demand Transport Energy Supply Deploy Clean Electricity Deploy Alternative Hydrocarbon Fuels Modernize the Grid Electrify the Fleet Increase Building and Industrial Efficiency Increase Vehicle Efficiency Source: DOE ,Quadrennial Technology Review, September 2011 eere.energy.gov Rapid Growth in Renewable Electricity Since 2008, the U.S. has doubled renewable energy generation from wind, solar, and

112

Electrical and Biological Effects of Transmission Lines: A Review.  

Science Conference Proceedings (OSTI)

This review describes the electrical properties of a-c and d-c transmission lines and the resulting effects on plants, animals, and people. Methods used by BPA to mitigate undesirable effects are also discussed. Although much of the information in this review pertains to high-voltage transmission lines, information on distribution lines and electrical appliances is included. The electrical properties discussed are electric and magnetic fields and corona: first for alternating-current (a-c) lines, then for direct current (d-c).

Lee, Jack M.

1989-06-01T23:59:59.000Z

113

Federal Register Notice: Plan for Conduct of 2012 Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice: Plan for Conduct of 2012 Electric Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study November 10, 2011 - 1:42pm Addthis The Department has issued a Federal Register Notice initiating preparations for development of the 2012 National Electric Transmission Congestion Study. The Department is seeking comments on what publicly-available data and information should be considered, and what types of analysis should be performed to identify and understand the significance and character of transmission congestion. DOE will host four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the study. Addthis Related Articles 2012 Congestion Study Workshops to be Held in December; Agendas Now

114

2012 National Electric Transmission Congestion Study: Presentation from  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study: Presentation National Electric Transmission Congestion Study: Presentation from Congestion Study Webinar Series 2012 National Electric Transmission Congestion Study: Presentation from Congestion Study Webinar Series August 21, 2012 - 12:29pm Addthis The Department is preparing the 2012 Congestion Study now, and is hosting three webinars in August 2012 to receive input and suggestions concerning the preliminary findings of the study. The updated presentation used in the webinars is now available. Addthis Related Articles 2012 Congestion Study Webinars to Present Preliminary Findings and Receive Input from Stakeholders 2012 Congestion Study Workshops to be Held in December; Agendas Now Available Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study

115

Proposed Open Access Requirement for International Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Open Access Requirement for International Electric Proposed Open Access Requirement for International Electric Transmission Facilities and Delegation to the Federal Energy Regulatory Commission: Federal Register Notice Volume 64, No. 143 - Jul. 27, 1999 Proposed Open Access Requirement for International Electric Transmission Facilities and Delegation to the Federal Energy Regulatory Commission: Federal Register Notice Volume 64, No. 143 - Jul. 27, 1999 Notice is given of the Department of Energy's (DOE or Department) intention to amend existing Presidential permits issued for the construction, operation, maintenance, or connection of facilities at the international border for the transmission of electric energy between the United States and foreign countries to require permit holders to provide ondiscriminatory open access transmission services. The open access

116

National Electric Transmission Congestion Study 2006 Executive Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EXECUTIVE EXECUTIVE SUMMARY AUGUST 2006 U.S. Department of Energy NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY EXECUTIVE SUMMARY AUGUST 2006 U.S. Department of Energy Executive Summary Section 1221(a) of the Energy Policy Act of 2005 amended the Federal Power Act (FPA) by adding a new section 216 to that Act. FPA section 216(a) di- rected the Secretary of Energy to conduct a nation- wide study of electric transmission congestion 1 by August 8, 2006. Based upon the congestion study, comments thereon, and considerations that include economics, reliability, fuel diversity, national en- ergy policy, and national security, the Secretary may designate "any geographic area experiencing electric energy transmission capacity constraints or congestion that adversely affects customers as a na- tional interest electric transmission corridor." The national congestion study

117

2012 National Electric Transmission Congestion Study Webinars | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

National Electric Transmission Congestion Study 2012 » 2012 National Electric Transmission Congestion Study Webinars 2012 National Electric Transmission Congestion Study Webinars The Department of Energy hosted three webinars in August 2012 to present the preliminary findings of DOE's 2012 National Electric Transmission Congestion Study, with time in each for dialogue and discussion. Two of the webinars were to discuss with state officials the initial findings of the DOE 2012 congestion analysis. The third webinar was for industry representatives and other interested parties, although stakeholders could dial into any of the three meetings. The webinars were held on: Tuesday, August 7, 2012 2-3:30 pm ET (state focus) Thursday, August 16, 2012 2-3:30 pm ET (industry and others)

118

2012 National Electric Transmission Congestion Study | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

2012 2012 National Electric Transmission Congestion Study 2012 National Electric Transmission Congestion Study 2012 National Electric Transmission Congestion Study The Department issued a Federal Register Notice initiating preparations for development of the 2012 National Electric Transmission Congestion Study. DOE hosted four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the study. DOE appreciates the comments that various individuals and organizations submitted. The Department is preparing the 2012 Congestion Study now, and hosted three webinars in August 2012 to receive input and suggestions concerning the preliminary findings of the study. The presentation used in the webinars is now available. Later this year, DOE will release a draft of the study

119

Proposed Open Access Requirement for International Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Open Access Requirement for International Electric Proposed Open Access Requirement for International Electric Transmission Facilities and Delegation to the Federal Energy Regulatory Commission: Federal Register Notice Volume 64, No. 143 - Jul. 27, 1999 Proposed Open Access Requirement for International Electric Transmission Facilities and Delegation to the Federal Energy Regulatory Commission: Federal Register Notice Volume 64, No. 143 - Jul. 27, 1999 Notice is given of the Department of Energy's (DOE or Department) intention to amend existing Presidential permits issued for the construction, operation, maintenance, or connection of facilities at the international border for the transmission of electric energy between the United States and foreign countries to require permit holders to provide ondiscriminatory open access transmission services. The open access

120

2012 National Electric Transmission Congestion Study - San Diego...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San Diego Workshop 2012 National Electric Transmission Congestion Study - San Diego Workshop On December 15, 2011, DOE hosted a regional pre-study workshop in San Diego, CA to...

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

2012 National Electric Transmission Congestion Study- San Diego Workshop  

Energy.gov (U.S. Department of Energy (DOE))

On December 15, 2011, DOE hosted a regional pre-study workshop in San Diego, CA to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop...

122

Transmission Pricing Issues for Electricity Generation From Renewable Resources  

Reports and Publications (EIA)

This article discusses how the resolution of transmission pricing issues which have arisen under the Federal Energy Regulatory Commission's (FERC) open access environment may affect the prospects for renewable-based electricity.

Information Center

1999-02-01T23:59:59.000Z

123

Electricity Transmission in a Restructured Industry: Data Needs...  

NLE Websites -- All DOE Office Websites (Extended Search)

Electricity Transmission in a Restructured Industry: Data Needs for Public Policy Analysis Speaker(s): Douglas Hale Date: February 24, 2005 - 12:00pm Location: Bldg. 90 Seminar...

124

Full Text of the National Electric Transmission Congestion Study 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUGUST AUGUST 2006 U.S. Department of Energy NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY AUGUST 2006 U.S. Department of Energy NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY AUGUST 2006 U.S. Department of Energy Contents Executive Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii Acronyms Used in This Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1. Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1. Organization of This Study . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.2. Definitions of Key Terms and Concepts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1.3. Consultation with States and Regional Entities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 2. Study Approach and Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

125

Unbundling generation and transmission services for competitive electricity markets  

SciTech Connect

Ancillary services are those functions performed by the equipment and people that generate, control, and transmit electricity in support of the basic services of generating capacity, energy supply, and power delivery. The Federal Energy Regulatory Commission (FERC) defined such services as those `necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system.` The nationwide cost of ancillary services is about $12 billion a year, roughly 10% of the cost of the energy commodity. More important than the cost, however, is the necessity of these services for bulk-power reliability and for the support of commercial transactions. FERC`s landmark Order 888 included a pro forma tariff with provision for six key ancillary services. The Interconnected Operations Services Working Group identified another six services that it felt were essential to the operation of bulk-power systems. Several groups throughput the United States have created or are forming independent system operators, which will be responsible for reliability and commerce. To date, the electricity industry (including traditional vertically integrated utilities, distribution utilities, power markets and brokers, customers, and state and federal regulators) has paid insufficient attention to these services. Although the industry had made substantial progress in identifying and defining the key services, much remains to be doe to specify methods to measure the production, delivery, and consumption of these services; to identify the costs and cost-allocation factors for these services; and to develop market and operating rules for their provision and pricing. Developing metrics, determining costs, and setting pricing rules are important because most of these ancillary services are produced by the same pieces of equipment that produce the basic electricity commodity. Thus, the production of energy and ancillary services is highly interactive, sometimes complementary and sometimes competing. In contrast to today`s typical time-invariant, embedded-cost prices, competitive prices for ancillary services would vary with system loads and spot prices for energy.

Hirst, E.; Kirby, B.

1998-01-01T23:59:59.000Z

126

2006 National Electric Transmission Congestion Study | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

127

2009 National Electric Transmission Congestion Study | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

128

National Electric Transmission Congestion Studies | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

129

2012 National Electric Transmission Congestion Study Workshops...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

130

2012 National Electric Transmission Congestion Study | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

131

National Interest Electric Transmission Corridors | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

132

2012 National Electric Transmission Congestion Study Webinars...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

133

Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Power Transmission and Distribution (EPTD) Smart Grid Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New York) Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New York) < Back Eligibility Agricultural Commercial Construction Industrial Institutional Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Home Weatherization Solar Wind Program Info State New York Program Type Grant Program Provider New York State Energy Research and Development Authority Up to $10 million in funds is available from NYSERDA to support research and engineering studies, product development and demonstration projects that improve the reliability, efficiency, quality, and overall performance

134

2012 National Electric Transmission Congestion Study: Preliminary Findings - updated presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meyer Meyer Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 2012 National Electric Transmission Congestion Study Preliminary Findings Stakeholder Consultation Webinars August 2012 Background  The Energy Policy Act of 2005 amended the Federal Power Act to require DOE to conduct a transmission congestion study every three years, in consultation with the states.  DOE published a study in 2006, and a second for 2009 (in early 2010). We are now preparing the 2012 study.  Statutory text directs DOE to seek to identify "geographic areas experiencing ... transmission capacity constraints or congestion that adversely affects consumers ...."  Statute also authorizes (but does not require) the Secretary

135

Electrical Safety Practices in Underground Transmission Systems  

Science Conference Proceedings (OSTI)

This report addresses utility safety practices relating to underground transmission cables and provides analytical approaches and worked examples for induced voltages and currents for several scenarios that may be encountered by utilities.BackgroundSafety is of paramount importance in all areas of utility system operations. All utilities have safety practices and procedures in place to protect their workers and the public ...

2012-12-20T23:59:59.000Z

136

2009 National Electric Transmission Congestion Study - San Francisco  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San San Francisco Workshop 2009 National Electric Transmission Congestion Study - San Francisco Workshop On June 11, 2008, DOE hosted a regional pre-study workshop in San Francisco, CA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 6-11-08 Congestion Workshop Agenda - San Francisco, CA.pdf Transcript - 2009 National Electric Transmission Congestion Study San Francisco Workshop.pdf California Initiatives To Be Considered in DOE's 2009 Congestion Study, submitted at 2009 Congestion Study San Francisco workshop.pdf Arizona Renewable Transmission Task Force BTA Response, submitted at 2009 Congestion Study San Francisco workshop.pdf

137

Full Text of the National Electric Transmission Congestion Study 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DECEMBER DECEMBER 2009 U.S. Department of Energy NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY DECEMBER 2009 U.S. Department of Energy NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY DECEMBER 2009 U.S. Department of Energy Note to Readers As the Department of Energy (DOE) stated when it announced the beginning of its work on this study in May 2006, the 2009 Congestion Study focused on the identification of existing electric transmission-level congestion based on publicly available historic information and data related to transmission congestion. The information and data used by DOE in conducting the analysis in this study was that which was available through May 2009. As a result the study does not address the possible impacts of the recent recession on congestion, or any other recent events, reports, or other developments affecting congestion. Consistent with the requirements

138

2009 National Electric Transmission Congestion Study - San Francisco  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San San Francisco Workshop 2009 National Electric Transmission Congestion Study - San Francisco Workshop On June 11, 2008, DOE hosted a regional pre-study workshop in San Francisco, CA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 6-11-08 Congestion Workshop Agenda - San Francisco, CA.pdf Transcript - 2009 National Electric Transmission Congestion Study San Francisco Workshop.pdf California Initiatives To Be Considered in DOE's 2009 Congestion Study, submitted at 2009 Congestion Study San Francisco workshop.pdf Arizona Renewable Transmission Task Force BTA Response, submitted at 2009 Congestion Study San Francisco workshop.pdf

139

Economics of Electric Compressors for Gas Transmission  

E-Print Network (OSTI)

Three new factors are coming together to motivate gas pipeline firms to consider electric motors for replacement of older reciprocating gas engines for compressor systems, and for new compressor installations. These factors are environmental regulations, economics, and new compressor technology. In ozone Non-Attainment regions, it is necessary to bring gas compressors into compliance with NOx regulations, and replacement with new electric systems represents a Lowest Achievable Emission Rate (LAER) option. Outside of these regions, new electric drives as well as gas fueled reciprocating engines and turbines are being considered for replacement of older reciprocating gas engines and compressor units, based on improved operating efficiency. We review here the impacts of the Clean Air Act Amendments of 1990 and economics on the selection process for considering electric drives versus alternatives for both ozone Non-Attainment areas and Attainment areas.

Schmeal, W. R.; Hibbs, J. J.

1994-04-01T23:59:59.000Z

140

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Elisha Gray  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

142

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Robert Martin  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

143

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Michael Marino  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

144

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Larry Rappaport  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

145

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Linda Upham  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

146

National Electric Transmission Congestion Study 2012 - How to Submit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study 2012 - How to National Electric Transmission Congestion Study 2012 - How to Submit Comments National Electric Transmission Congestion Study 2012 - How to Submit Comments You may submit written comments to Congestionstudy2012@hq.doe.gov or by mail to: Office of Electricity Delivery and Energy Reliability, OE-20 U.S. Department of Energy 1000 Independence Avenue SW. Washington, DC 20585 The Department intends to use only data that is publicly available for this study. Accordingly, please do not submit information that you believe is or should be protected from public disclosure. DOE is responsible for the final determination concerning disclosure or nondisclosure of information submitted to DOE and for treating it in accordance with the DOE's Freedom of Information regulations (10 CFR 1004.11). All comments received by DOE

147

Electrical Safety Practices of Underground Transmission Systems  

Science Conference Proceedings (OSTI)

Safety is of paramount importance in all areas of utility system operations. All utilities have safety practices and procedures in place to protect their workers and the public and are diligent about monitoring compliance. However, underground transmission cables present unique requirements that might not be covered in existing utility safety practices. This report addresses the grounding requirements and induced voltage calculation procedures that should be considered when performing operation, mainten...

2010-12-23T23:59:59.000Z

148

National Electric Transmission Congestion Study 2012 Workshops | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Congestion Study 2012 Workshops Transmission Congestion Study 2012 Workshops National Electric Transmission Congestion Study 2012 Workshops DOE will host four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the National Electric Transmission Congestion Study 2012. For details, please see the pdfs, below. Online registration for these workshops is now available. Agendas are available below. Note: The November 10, 2011 Federal Register notice incorrectly stated that the four regional workshops will be simulcast over the Internet and that advanced registration for the Webcasts is required. The workshops will not be simulcast. The Department requests, but does not require, those who are planning to attend the workshops in person to pre-register using the link

149

2012 National Electric Transmission Congestion Study - St. Louis Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

St. Louis St. Louis Workshop 2012 National Electric Transmission Congestion Study - St. Louis Workshop On December 8, 2011, DOE hosted a regional pre-study workshop in St. Louis, MO to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Eastern Workshops 12-08-11 Congestion Workshop Agenda - St Louis (final).pdf Introduction by David Meyer, DOE Presentation by Kevin Gunn, MO PSC.pdf Presentation by Jerry Lein, ND PSC.pdf Presentation by Tom Sloan, KS Legislature.pdf Presentation by Maureen Borkowski, Ameren.pdf Presentation by Laureen L Ross McCalib, Great River Energy.pdf Presentation by Dale Osborn, MISO.pdf

150

2009 National Electric Transmission Congestion Study - Oklahoma City  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Oklahoma City Workshop 2009 National Electric Transmission Congestion Study - Oklahoma City Workshop On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City, OK to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 6-18-08 Congestion Workshop Agenda - Oklahoma City, OK.pdf Transcript - 2009 National Electric Transmission Congestion Study Oklahoma City Workshop.pdf Independent Market Monitor Monthly Market Metrics Report, May 2008, submitted at 2009 Congestion Study Oklahoma City workshop.pdf Comments of the Missouri Public Service Missouri Commission, submitted at 2009 Congestion Study Oklahoma City workshop.pdf

151

2012 National Electric Transmission Congestion Study - Portland Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portland Portland Workshop 2012 National Electric Transmission Congestion Study - Portland Workshop On December 13, 2011, DOE hosted a regional pre-study workshop in Portland, OR to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Western Workshops.pdf 12-13-11 CONGESTION WORKSHOP AGENDA - PORTLAND (final).pdf Introduction by David Meyer, DOE .pdf Presentation by Steve Oxley, WY PSC.pdf Presentation by Rich Bayless, NTTG.pdf Presentation by Susan Henderson, Xcel Energy.pdf Presentation by Marv Landauer, ColumbiaGrid.pdf Presentation by Steve Metague, PGE.pdf Presentation by Bradley Nickell, WECC.pdf

152

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appendix A Appendix A Consultation Letters Appendix A- Consultation Letters A-1 APPENDIX A CONTENTS A-2 Letter from the State Historic Preservation Office regarding Certificate of Environmental Compatibility Case No. 111: The Proposed Tucson Electric Power Company (TEP) South Substation to Nogales Transmission Line, Pima and Santa Cruz Counties, Arizona A-6 Letter from Tetra Tech, Inc. to El Paso Natural Gas, regarding the Proposed Tucson Electric Power Transmission Line Adjacent to an El Paso Natural Gas Company Pipeline A-8 Letter from Tetra Tech, Inc. to the Drug Enforcement Administration, regarding the Proposed Tucson Electric Power Transmission Line near Nogales, Arizona A-10 Letter from Tetra Tech, Inc. to the U.S. Immigration and Naturalization Service, regarding the

153

Registration Contact List: Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11/2/2012 11/2/2012 First Name Last Name Title Company Address1 Address2 City State/Province Zip Country Work Phone Sandy Aivaliotis , Valley Group, a Nexans 3A Trowbridge Drive Bethel CT 6801 United States 416-648-4382 Robert Anders Management U.S. Department of Energy / EERE Rm 6A-067 1000 Independence Ave., SW Washington DC 20585 United States 202-586-4716 Phillip Anderson g g Project Leader Idaho Power 1221 W. Idaho St. Boise ID 83702 United States 208-484-2024 Mihai Anitescu Dr. Argonne National Laboratory 9700 S Cas Avenue Argonne IL 60439 United States 16302524172 Sam Baldwin Officer USDOE/EERE 1000 Independence Ave., SW Washington DC 20585 United States 202-586-0927 Thomas Baldwin Energy Lead Idaho National Laboratory P.O. Box 1655 Idaho Falls ID 83415-3810 United States 208-526-1864 Venkat Banunarayanan g Transmission Department of Energy

154

Maintaining Electrical System Reliability Under a Closed-Cycle Cooling Retrofit Requirement  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) is investigating the implications of a potential U.S. Environmental Protection Agency (EPA) Clean Water Act 316(b) rulemaking that would establish "best technology available" (BTA) based on closed-cycle cooling retrofits for facilities with once-through cooling. This report focuses on the transmission system impacts that can potentially result from a requirement for use of closed-cycle cooling systems.

2011-07-20T23:59:59.000Z

155

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Lee Ann Moulder  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

156

National Electric Transmission Congestion Study 2009 Executive Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Executive Summary In the Energy Policy Act of 2005 (EPAct), Con- gress directed the U.S. Department of Energy (DOE) to conduct a study every three years on elec- tric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to in- clude in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmis- sion capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest elec- tric transmission corridor (National Corridor). In August 2006, the Department published its first National Electric

157

Electric vehicle drive train with direct coupling transmission  

DOE Patents (OSTI)

An electric vehicle drive train includes an electric motor and an associated speed sensor, a transmission operable in a speed reduction mode or a direct coupled mode, and a controller responsive to the speed sensor for operating the transmission in the speed reduction mode when the motor is below a predetermined value, and for operating the motor in the direct coupled mode when the motor speed is above a predetermined value. The controller reduces the speed of the motor, such as by regeneratively braking the motor, when changing from the speed reduction mode to the direct coupled mode. The motor speed may be increased when changing from the direct coupled mode to the speed reduction mode. The transmission is preferably a single stage planetary gearbox.

Tankersley, Jerome B. (Fredericksburg, VA); Boothe, Richard W. (Roanoke, VA); Konrad, Charles E. (Roanoke, VA)

1995-01-01T23:59:59.000Z

158

Electric vehicle drive train with direct coupling transmission  

DOE Patents (OSTI)

An electric vehicle drive train includes an electric motor and an associated speed sensor, a transmission operable in a speed reduction mode or a direct coupled mode, and a controller responsive to the speed sensor for operating the transmission in the speed reduction mode when the motor is below a predetermined value, and for operating the motor in the direct coupled mode when the motor speed is above a predetermined value. The controller reduces the speed of the motor, such as by regeneratively braking the motor, when changing from the speed reduction mode to the direct coupled mode. The motor speed may be increased when changing from the direct coupled mode to the speed reduction mode. The transmission is preferably a single stage planetary gearbox. 6 figures.

Tankersley, J.B.; Boothe, R.W.; Konrad, C.E.

1995-04-04T23:59:59.000Z

159

Application of Two-Speed Dual Clutch Transmission in Pure Electric Vehicle  

Science Conference Proceedings (OSTI)

Two-speed dual clutch transmission is used in electric vehicle to improve vehicle power performance and efficiency of an electric driveline. To illustrate the improvement of power performance and efficiency, single-speed transmission system was introduced ... Keywords: pure electric vehicle, dual clutch transmission, single-speed transmission

Yongdao Song; Xiusheng Cheng; Zhonghua Lu; Xueshong Li

2012-10-01T23:59:59.000Z

160

Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator  

Energy.gov (U.S. Department of Energy (DOE))

Supplemental comments of the Midwest Independent Transmission System Operaton on the application from International Transmission Company to construct, operate, and maintain electric transmission...

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Updating the Electric Grid: An Introduction to Non-Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Updating the Electric Grid: Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Prepared by The National Council on Electricity Policy September 2009 NATIONAL COUNCIL ON ELECTRICITY POLICY MEMBER ORGANIZATIONS The National Council on Electricity Policy (National Council) is a unique venture between the National Association of Regulatory Utility Commissioners (NARUC), the National Association of State Energy Officials (NASEO), the National Conference of State Legislatures (NCSL), National Association of Clean Air Agencies (NACAA) and the National Governors Association Center for Best Practices (NGA). The National Council also includes participation by the Federal Energy Regulatory Commission (FERC), U.S. Department of Energy (DOE), and the U.S. Environment Protection Agency (EPA). Established in

162

Exposure to transmission line electric fields during farming operations  

Science Conference Proceedings (OSTI)

This paper describes an analysis of exposure to transmission line electric fields during typical farming operations. This analysis makes use of experimentally determined ''activity factors'' and time budget information for typical farms as compiled by the U.S. Department of Agriculture. A detailed exposure assessment for 18 ''typical farms'' (as defined by USDA) is provided for a base case 345 kV design. Exposure estimates for transmission lines ranging from 115-765 kV are provided for a representative farm.

Silva, M.; Huber, D.

1985-09-01T23:59:59.000Z

163

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: PJM Letter filed Dec 8, 2011 in support of Settlement Agreement  

Energy.gov (U.S. Department of Energy (DOE))

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S - Canada border.

164

Electric power transmission for a Hanford Nuclear Energy Center (HNEC)  

SciTech Connect

The original study of transmission for a Hanford Nuclear Energy Center (HNEC), which was completed in September 1975, was updated in June 1978. The present 1983 revision takes cognizance of recent changes in the electric power situation of the PNW with respect to: (1) forecasts of load growth, (2) the feasibility of early use of 1100 kV transmission, and (3) the narrowing opportunities for siting nuclear plants in the region. The purpose of this update is to explore and describe additions to the existing transmission system that would be necessary to accommodate three levels of generation at HNEC. Comparisons with a PNW system having new thermal generating capacity distributed throughout the marketing region are not made as was done in earlier versions.

Harty, H.; Dowis, W.J.

1983-06-01T23:59:59.000Z

165

PP-16-1 UNS Electric Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-1 UNS Electric Inc PP-16-1 UNS Electric Inc Presidential permit authorizing UNS Electric Inc to construct, operate, and maintain electric transmission facilities at the...

166

Does EIA have data on the costs for electricity transmission and ...  

U.S. Energy Information Administration (EIA)

EIA does not have data on the costs to build or operate electricity transmission lines and distribution networks. However, ...

167

Central Wind Power Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities  

DOE Green Energy (OSTI)

The report addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America.

Porter, K.; Rogers, J.

2009-12-01T23:59:59.000Z

168

Do Generation Firms in Restructured Electricity Markets Have Incentives to Support Socially-Efficient Transmission Investments? *  

E-Print Network (OSTI)

that generation firms have in restructured electricity markets for supporting long-term transmission investments electricity markets, have the incentives to fund or support social-welfare-improving transmission investments.S. transmission system is under stress (Abraham, 2002). Growth of electricity demand and new generation capacity

169

Damping of bending waves in truss beams by electrical transmission lines with PZT actuators  

E-Print Network (OSTI)

Damping of bending waves in truss beams by electrical transmission lines with PZT actuators F. dell of the truss beam with an electrical transmission line by a line distribution of PZT actuators. It has been modular beams by coupling them with fourth-order electric transmission lines and adding PZT actu- ators

Paris-Sud XI, Université de

170

Electricity Transmission Pricing: How much does it cost to get it wrong?  

E-Print Network (OSTI)

PWP-058 Electricity Transmission Pricing: How much does it cost to get it wrong? Richard Green Channing Way Berkeley, California 94720-5180 www.ucei.berkeley.edu/ucei #12;Electricity Transmission optimal prices for electricity transmission. These are rarely applied in practice. This paper develops

California at Berkeley. University of

171

Maintaining Generation Adequacy in a Restructuring U.S. Electricity Industry  

SciTech Connect

Historically, decisions on the amounts, locations, types, and timing of investments in new generation have been made by vertically integrated utilities with approval from state public utility commissions. As the U.S. electricity industry is restructured, these decisions are being fragmented and dispersed among a variety of organizations. As generation is deregulated and becomes increasingly competitive, decisions on whether to build new generators and to retire, maintain, or repower existing units will increasingly be made by unregulated for-profit corporations. These decisions will be based largely on investor assessments of future profitability and only secondarily on regional reliability requirements. In addition, some customers will choose to face real-time (spot) prices and will respond to the occasionally very high prices by reducing electricity use at those times. Market-determined generation levels will, relative to centrally mandated reserve margins, lead to: (1) more volatile energy prices; (2) lower electricity costs and prices; and (3) a generation mix with more baseload, and less peaking, capacity. During the transition from a vertically integrated, regulated industry to a deintegrated, competitive industry, government regulators and system operators may continue to impose minimum-installed-capacity requirements on load-serving entities. As the industry gains experience with customer responses to real-time pricing and with operation of competitive intrahour energy markets, these requirements will likely disappear. We quantitatively analyzed these issues with the Oak Ridge Competitive Electricity Dispatch model (ORCED). Model results show that the optimal reserve margin depends on various factors, including fuel prices, initial mix of generation capacity, and customer response to electricity prices (load shapes and system load factor). Because the correct reserve margin depends on these generally unpredictable factors, mandated reserve margins might be too high, leading to higher electricity costs and prices. Absent mandated reserve margins, electricity prices and costs decline with increasing customer response to prices during high-demand periods. The issues discussed here are primarily transitional rather than enduring. However, the transition from a highly regulated, vertically integrated industry to one dominated by competition is likely to take another five to ten years.

Hirst, E.; Hadley, S.

1999-10-01T23:59:59.000Z

172

National Electric Transmission Congestion Study 2006 Eastern Interconnection Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Memorandum To: Poonum Agrawal, David Meyer, U.S. Department of Energy CRA No. D08554-00 From: Prashant Murti, Alex Rudkevich, CRA International Date: Finalized March 13, 2006 Subject: GE MAPS INPUT ASSUMPTIONS: EASTERN INTERCONNECT This memorandum summarizes salient inputs to the CRA locational price forecasting model (GE MAPS). The model geographic footprint encompasses the US portion of the Eastern Interconnect and the Canadian province of Ontario. The analyses simulate the years 2008 and 2011. Primary data sources for the CRA GE MAPS model include the NERC MMWG, the General Electric generation and transmission databases for the Eastern Interconnect, various publications by NERC regions and Independent System Operators, FERC submissions by generation and transmission owners,

173

PP-230 International Transmission Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Company to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border. PP-230 International Transmission Company More Documents &...

174

The Electricity Transmission System Opportunities to Overcome Key Challenges  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Opportunities to Overcome Key Challenges Opportunities to Overcome Key Challenges Summary Results of Breakout Group Discussions Electricity Transmission Workshop Double Tree Crystal City, Arlington, Virginia November 2, 2012 Breakout Group Discussion Overview Opportunities to Overcome Key Challenges Each of the four breakout groups prioritized the critical issues facing the grid from the list of synthesized challenges identified in the first breakout session of the workshop. Focusing on these top priorities, each group proposed specific R&D activities and initiatives that DOE can pursue to overcome these challenges and address existing gaps. Summary of Synthesized Challenges A. Need improved understanding of the availability, utility, maintenance, exchange, and security of data and associated requirements.

175

Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or conductors, and two neutral ground wires that would provide both lightning protection and fiber optic communications, on a single set of support structures. The transmission line would originate at TEP's existing South Substation (which TEP would expand), in the vicinity of Sahuarita, Arizona, and interconnect with the Citizens Communications (Citizens) system at a Gateway Substation that TEP would construct west of Nogales, Arizona. The double-circuit transmission line would continue from the Gateway Substation south to cross the U.S.-Mexico border and extend approximately 60 miles (mi) (98 kilometers [km]) into the Sonoran region of Mexico, connecting with the Comision Federal de Electricidad (CFE, the national electric utility of Mexico) at CFE's Santa Ana Substation.

N /A

2003-08-27T23:59:59.000Z

176

AN INFINITE DIMENSIONAL DESCRIPTOR SYSTEM MODEL FOR ELECTRICAL CIRCUITS WITH TRANSMISSION LINES  

E-Print Network (OSTI)

AN INFINITE DIMENSIONAL DESCRIPTOR SYSTEM MODEL FOR ELECTRICAL CIRCUITS WITH TRANSMISSION LINES TIMO REIS Abstract. In this paper a model of linear electrical circuits with transmission lines is de-coupled with the telegraph equations who describe the behavior of the transmission lines. The resulting system of equations

Reis, Timo

177

Firm-based Measurements of Market Power in Transmission-Constrained Electricity  

E-Print Network (OSTI)

Firm-based Measurements of Market Power in Transmission-Constrained Electricity Markets: Technical: Transmission constraints, electricity markets, market power, market power index, residual supply index. 1 approaches to analyzing firm-based market power con- sidering transmission constraints are proposed. One

Baldick, Ross

178

Integrated Decision Algorithms for Auto-steered Electric Transmission System Asset Management  

Science Conference Proceedings (OSTI)

Electric power transmission systems are comprised of a large number of physical assets, including transmission lines, power transformers, and circuit breakers, that are capital-intensive, highly distributed, and may fail. Managing these assets under ... Keywords: Benders decomposition, asset management, condition monitoring, decision algorithms, electric transmission, optimization, service-oriented architecture, software-hardware

James Mccalley; Vasant Honavar; Sarah Ryan; William Meeker; Daji Qiao; Ron Roberts; Yuan Li; Jyotishman Pathak; Mujing Ye; Yili Hong

2007-05-01T23:59:59.000Z

179

Lossy Electric Transmission Line Soft Fault Diagnosis: an Inverse Scattering Approach  

E-Print Network (OSTI)

1 Lossy Electric Transmission Line Soft Fault Diagnosis: an Inverse Scattering Approach Huaibin diagnosis is the reflectometry, which consists in analyzing the reflection and the transmission of electric Tang and Qinghua Zhang Abstract--In this paper, the diagnosis of soft faults in lossy electric

Paris-Sud XI, Université de

180

Abstract--Three known use-based allocation methods for payments of electricity transmission systems are compared.  

E-Print Network (OSTI)

Abstract-- Three known use-based allocation methods for payments of electricity transmission of the electricity markets. Electricity transmission has economies of scale and scope, making the transmission sector in identifying the transmission lines used by each agent of the system. Electricity flows in accordance

Rudnick, Hugh

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Electricity transmission pricing : how much does it cost to get it wrong?  

E-Print Network (OSTI)

Economists know how to calculate optimal prices for electricity transmission. These are rarely applied in practice. This paper develops a thirteen node model of the transmission system in England and Wales, incorporating ...

Green, Richard

2004-01-01T23:59:59.000Z

182

The Electricity Transmission System Future Vision & Grid Challenges  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Future Vision & Grid Challenges Future Vision & Grid Challenges Summary Results of Breakout Group Discussions Electricity Transmission Workshop Double Tree Crystal City, Arlington, Virginia November 1, 2012 Breakout Group Discussion Overview Future Vision and Grid Challenges Each of the four breakout groups identified the key challenges facing the grid as it integrates all of the various technologies that are (or will be) deployed while ensuring a safe, reliable, and cost-effective system as described in the Future Vision. Utilizing the Grid Tech Team framework, each group identified integration challenges through a systems-based discussion that addressed all of the following topics: * Grid Visibility What challenges in the informational domain (sensors and relays, AMIs, PMUs, end-use energy

183

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Fossil Energy U.S. Department of Energy 1000 Independence Avenue, S.W. Washington, DC 20585 Cooperating Agencies: U.S. Department of the Interior Bureau of Land Management U.S. Department of Agriculture Forest Service COVER SHEET Responsible Agency: U.S. Department of Energy (DOE), Office of Fossil Energy (FE) Cooperating Agencies: U.S. Department of Agriculture Forest Service (USFS), U.S. Department of the Interior Bureau of Land Management (BLM) Title: Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line Final Environmental Impact Statement (EIS) Location: Pima and Santa Cruz Counties, Arizona Contacts: For additional information on this Final Environmental Impact Statement (EIS), contact: For general information on the DOE

184

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUMMARY Office of Fossil Energy U.S. Department of Energy 1000 Independence Avenue, S.W. Washington, DC 20585 Cooperating Agencies: U.S. Department of the Interior Bureau of Land Management U.S. Department of Agriculture Forest Service Tucson Electric Power Company Sahuarita-Nogales Transmission Line Final Environmental Impact Statement January 2005 DOE/EIS - 0336 BLM Reference No. AZA 31746 SUMMARY Office of Fossil Energy U.S. Department of Energy 1000 Independence Avenue, S.W. Washington, DC 20585 Cooperating Agencies: U.S. Department of the Interior Bureau of Land Management U.S. Department of Agriculture Forest Service COVER SHEET Responsible Agency: U.S. Department of Energy (DOE), Office of Fossil Energy (FE)

185

Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition  

DOE Green Energy (OSTI)

The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

Rogers, J.; Porter, K.

2011-03-01T23:59:59.000Z

186

Transmission and Grid Integration: Electricity, Resources, & Building Systems Integration (Fact Sheet)  

SciTech Connect

Factsheet developed to describe the activites of the Transmission and Grid Integration Group within NREL's Electricity, Resources, and Buildings Systems Integration center.

Not Available

2009-09-01T23:59:59.000Z

187

Analyzing strategic behaviors in electricity markets via transmission-constrained residual demand.  

E-Print Network (OSTI)

??This dissertation studies how to characterize strategic behaviors in electricity markets from a transmission-constrained residual demand perspective. This dissertation generalizes the residual demand concept, widely… (more)

Xu, Lin

2010-01-01T23:59:59.000Z

188

Conflicting Investment Incentives in Electricity Transmission Enzo Sauma, Student Member, IEEE and Shmuel S. Oren, Fellow, IEEE  

E-Print Network (OSTI)

1 Conflicting Investment Incentives in Electricity Transmission Enzo Sauma, Student Member, IEEE illustrates the potential existence of conflicting incentives concerning electricity transmission investment, this principle is not always true in deregulated electricity systems, where transfers are not always feasible

189

DOE EAC Electricity Adequacy Report. Transmission Section - September...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Electricity Delivery & Energy Reliability Search form Search Office of Electricity Delivery & Energy Reliability Services Electricity...

190

US Recovery Act Smart Grid Projects - Electric Transmission Systems | Open  

Open Energy Info (EERE)

American_Transmission_Company_LLC_II_Smart_Grid_Project\" American_Transmission_Company_LLC_II_Smart_Grid_Project\" title=\"American Transmission Company LLC II Smart Grid Project\">American Transmission Company LLC II Smart Grid Project","title":"American Transmission Company LLC II Smart Grid Project","link":null,"lat":43.0116784,"lon":-88.2314813,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Transmission_Company_LLC_Smart_Grid_Project\" title=\"American Transmission Company LLC Smart Grid Project\">American

191

Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Bulk Electric Power Systems: Bulk Electric Power Systems: Operations and Transmission Planning Volume 4 of 4 Volume 2 PDF Volume 3 PDF Volume 1 PDF Volume 4 PDF NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Energy Laboratory Baldwin, S. U.S. Department of Energy DeMeo, E. Renewable Energy Consulting Services, Inc. Reilly, J.M. Massachusetts Institute of Technology Mai, T. National Renewable Energy Laboratory Arent, D. Joint Institute for Strategic Energy Analysis Porro, G. National Renewable Energy Laboratory Meshek, M. National Renewable Energy Laboratory Sandor, D. National Renewable

192

Wireless Sensor Network for Electric Transmission Line Monitoring  

SciTech Connect

Generally, federal agencies tasked to oversee power grid reliability are dependent on data from grid infrastructure owners and operators in order to obtain a basic level of situational awareness. Since there are many owners and operators involved in the day-to-day functioning of the power grid, the task of accessing, aggregating and analyzing grid information from these sources is not a trivial one. Seemingly basic tasks such as synchronizing data timestamps between many different data providers and sources can be difficult as evidenced during the post-event analysis of the August 2003 blackout. In this project we investigate the efficacy and cost effectiveness of deploying a network of wireless power line monitoring devices as a method of independently monitoring key parts of the power grid as a complement to the data which is currently available to federal agencies from grid system operators. Such a network is modeled on proprietary power line monitoring technologies and networks invented, developed and deployed by Genscape, a Louisville, Kentucky based real-time energy information provider. Genscape measures transmission line power flow using measurements of electromagnetic fields under overhead high voltage transmission power lines in the United States and Europe. Opportunities for optimization of the commercial power line monitoring technology were investigated in this project to enable lower power consumption, lower cost and improvements to measurement methodologies. These optimizations were performed in order to better enable the use of wireless transmission line monitors in large network deployments (perhaps covering several thousand power lines) for federal situational awareness needs. Power consumption and cost reduction were addressed by developing a power line monitor using a low power, low cost wireless telemetry platform known as the ''Mote''. Motes were first developed as smart sensor nodes in wireless mesh networking applications. On such a platform, it has been demonstrated in this project that wireless monitoring units can effectively deliver real-time transmission line power flow information for less than $500 per monitor. The data delivered by such a monitor has during the course of the project been integrated with a national grid situational awareness visualization platform developed by Oak Ridge National Laboratory. Novel vibration energy scavenging methods based on piezoelectric cantilevers were also developed as a proposed method to power such monitors, with a goal of further cost reduction and large-scale deployment. Scavenging methods developed during the project resulted in 50% greater power output than conventional cantilever-based vibrational energy scavenging devices typically used to power smart sensor nodes. Lastly, enhanced and new methods for electromagnetic field sensing using multi-axis magnetometers and infrared reflectometry were investigated for potential monitoring applications in situations with a high density of power lines or high levels of background 60 Hz noise in order to isolate power lines of interest from other power lines in close proximity. The goal of this project was to investigate and demonstrate the feasibility of using small form factor, highly optimized, low cost, low power, non-contact, wireless electric transmission line monitors for delivery of real-time, independent power line monitoring for the US power grid. The project was divided into three main types of activity as follows; (1) Research into expanding the range of applications for non-contact power line monitoring to enable large scale low cost sensor network deployments (Tasks 1, 2); (2) Optimization of individual sensor hardware components to reduce size, cost and power consumption and testing in a pilot field study (Tasks 3,5); and (3) Demonstration of the feasibility of using the data from the network of power line monitors via a range of custom developed alerting and data visualization applications to deliver real-time information to federal agencies and others tasked with grid reliability (Tasks 6,8)

Alphenaar, Bruce

2009-06-30T23:59:59.000Z

193

Do Generation Firms in Restructured Electricity Markets Have Incentives to Support Social-Welfare-Improving Transmission Investments? *  

E-Print Network (OSTI)

that generation firms have in restructured electricity markets for supporting long-term transmission investments electricity markets, have the incentives to fund or support incremental social-welfare-improving transmission.S. transmission system is under stress (Abraham, 2002). Growth of electricity demand and new generation capacity

194

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

195

Randomized flow model and centrality measure for electrical power transmission network analysis  

E-Print Network (OSTI)

1 Randomized flow model and centrality measure for electrical power transmission network analysis. Centrality measures can then be coherently defined. An example of application to an electrical power transmission system is presented. Acknowledgements This work has been partially funded by the Foundation pour

196

Maximal network reliability with optimal transmission line assignment for stochastic electric power networks via genetic algorithms  

Science Conference Proceedings (OSTI)

This study proposes a genetic algorithm based method integrating the minimal paths and the recursive sum of disjoint products to find maximal network reliability with optimal transmission line assignment for a stochastic electric power network. In our ... Keywords: Genetic algorithm, Maximal network reliability, Recursive sum of disjoint products, Stochastic electric power network, Transmission line assignment

Yi-Kuei Lin; Cheng-Ta Yeh

2011-03-01T23:59:59.000Z

197

THE COUNCIL OF STATE GOVERNMENTS THE ELECTRIC TRANSMISSION LINE SITING COMPACT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COUNCIL OF STATE GOVERNMENTS COUNCIL OF STATE GOVERNMENTS THE ELECTRIC TRANSMISSION LINE SITING COMPACT LEGISLATIVE BRIEFING Background and Summary Background and Need The siting of interstate transmission lines has long been a problem that has vexed both states and the federal government. With the expected growth in electricity demand, coupled with the need to bring renewable energy to market and the necessity to enhance and secure the nation's energy infrastructure, the need for added transmission capacity has never been more apparent. National need and parochial interests, however, often do not align and have led to an underdeveloped and overstressed electricity transmission system.

198

Electric power high-voltage transmission lines: Design options, cost, and electric and magnetic field levels  

SciTech Connect

This report provides background information about (1) the electric and magnetic fields (EMFs) of high-voltage transmission lines at typical voltages and line configurations and (2) typical transmission line costs to assist on alternatives in environmental documents. EMF strengths at 0 {+-} 200 ft from centerline were calculated for ac overhead lines, and for 345 and 230-kV ac underground line and for a {+-}450-kV dc overhead line. Compacting and height sensitivity factors were computed for the variation in EMFs when line conductors are moved closer or raised. Estimated costs for the lines are presented and discussed so that the impact of using alternative strategies for reducing EMF strengths and the implications of implementing the strategies can be better appreciated.

Stoffel, J.B.; Pentecost, E.D.; Roman, R.D.; Traczyk, P.A.

1994-11-01T23:59:59.000Z

199

Forced cooling of underground electric power transmission lines : design manual  

E-Print Network (OSTI)

The methodology utilized for the design of a forced-cooled pipe-type underground transmission system is presented. The material is divided into three major parts: (1) The Forced-cooled Pipe-Type Underground Transmission ...

Brown, Jay A.

1978-01-01T23:59:59.000Z

200

Electric Utility Transmission and Distribution Line Engineering Program  

Science Conference Proceedings (OSTI)

Economic development in the United States depends on a reliable and affordable power supply. The nation will need well educated engineers to design a modern, safe, secure, and reliable power grid for our future needs. An anticipated shortage of qualified engineers has caused considerable concern in many professional circles, and various steps are being taken nationwide to alleviate the potential shortage and ensure the North American power system's reliability, and our world-wide economic competitiveness. To help provide a well-educated and trained workforce which can sustain and modernize the nation's power grid, Gonzaga University's School of Engineering and Applied Science has established a five-course (15-credit hour) Certificate Program in Transmission and Distribution (T&D) Engineering. The program has been specifically designed to provide working utility engineering professionals with on-line access to advanced engineering courses which cover modern design practice with an industry-focused theoretical foundation. A total of twelve courses have been developed to-date and students may select any five in their area of interest for the T&D Certificate. As each course is developed and taught by a team of experienced engineers (from public and private utilities, consultants, and industry suppliers), students are provided a unique opportunity to interact directly with different industry experts over the eight weeks of each course. Course material incorporates advanced aspects of civil, electrical, and mechanical engineering disciplines that apply to power system design and are appropriate for graduate engineers. As such, target students for the certificate program include: (1) recent graduates with a Bachelor of Science Degree in an engineering field (civil, mechanical, electrical, etc.); (2) senior engineers moving from other fields to the utility industry (i.e. paper industry to utility engineering or project management positions); and (3) regular working professionals wishing to update their skills or increase their knowledge of utility engineering design practices and procedures. By providing graduate educational opportunities for the above groups, the T&D Program will help serve a strong industry need for training the next generation of engineers in the cost-effective design, construction, operation, and maintenance of modern electrical transmission and distribution systems. In addition to developing the on-line engineering courses described above, the T&D Program also focused significant efforts towards enhancing the training opportunities available to power system operators in the northwest. These efforts have included working with outside vendors to provide NERC-approved training courses in Gonzaga University's (GU) system operator training facility, support for an accurate system model which can be used in regional blackstart exercises, and the identification of a retired system operator who could provide actual regional training courses. The GU system operator training facility is also being used to recruit young workers, veterans, and various under-represented groups to the utility industry. Over the past three years students from Columbia Gorge Community College, Spokane Falls Community College, Walla Walla Community College, Central Washington University, Eastern Washington University, Gonzaga University, and various local high schools have attended short (one-day) system operator training courses free of charge. These collaboration efforts has been extremely well received by both students and industry, and meet T&D Program objectives of strengthening the power industry workforce while bridging the knowledge base across power worker categories, and recruiting new workers to replace a predominantly retirement age workforce. In the past three years the T&D Program has provided over 170 utility engineers with access to advanced engineering courses, been involved in training more than 300 power system operators, and provided well over 500 college and high school students with an experienc

Peter McKenny

2010-08-31T23:59:59.000Z

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Electricity transmission congestion costs: A review of recent reports  

E-Print Network (OSTI)

Making Competition Work in Electricity. John Wiley and Sons.Report on the New York Electricity Markets. June. Patton,Market Report: New York Electricity Markets. April. PJM (PJM

Lesieutre, Bernard C.; Eto, Joseph H.

2003-01-01T23:59:59.000Z

202

Converting Site Electricity to Include Generation and Transmission...  

U.S. Energy Information Administration (EIA) Indexed Site

Evaluation of Electricity Consumption in the Manufacturing Division The energy intensities presented in this report do not reflect adjustments for losses in electricity generation...

203

Electricity transmission congestion costs: A review of recent reports  

E-Print Network (OSTI)

in wholesale electricity trade, and enable consumers to seekelectricity markets rely on offer-based, centralized, wholesale tradeas reported in the trade press. These electricity hub prices

Lesieutre, Bernard C.; Eto, Joseph H.

2003-01-01T23:59:59.000Z

204

The design, construction, and operation of long-distance high-voltage electricity transmission technologies.  

SciTech Connect

This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these conductors at a safe distance from each other and from the ground and the natural and built environment. Common elements that are generally less visible (or at least more easily overlooked) include the maintained ROW along the path of the towers, access roads needed for maintenance, and staging areas used for initial construction that may be restored after construction is complete. Also visible but less common elements along the corridor may include switching stations or substations, where lines of similar or different voltages meet to transfer power.

Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

2008-03-03T23:59:59.000Z

205

Updating the Electric Grid: An Introduction to Non-Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance...

206

EPRI-GTC Overhead Electric Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

This report explains and documents a standardized process that utilities could use to improve the way transmission line routes are evaluated and selected.

2006-02-06T23:59:59.000Z

207

Electric Transmission Network: A Multi-Region Analysis, The  

Reports and Publications (EIA)

This paper examines the ability of the existing transmission network to respond efficiently to increased trade over four reliability regions in the northeastern United States.

Robert T. Eynon

2000-08-01T23:59:59.000Z

208

Electric Field Sensor Array for Node Localization on Two-Dimensional Signal Transmission Sheet  

E-Print Network (OSTI)

Electric Field Sensor Array for Node Localization on Two-Dimensional Signal Transmission Sheet Kei). In the method, the sensor node determines its own position by reading the electric field patterns above scanning. In this paper, firstly we introduce the method. Then we describe the structure of an electric

Shinoda, Hiroyuki

209

Electricity Markets and Policy Group Energy Analysis Department The Cost of Transmission for Wind  

E-Print Network (OSTI)

Electricity Markets and Policy Group · Energy Analysis Department 1 The Cost of Transmission Lawrence Berkeley National Laboratory February 2009 #12;Electricity Markets and Policy Group · Energy Implications and Future Work #12;Electricity Markets and Policy Group · Energy Analysis Department 3 Motivation

210

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TEP Sahuarita-Nogales Transmission Line Final EIS TEP Sahuarita-Nogales Transmission Line Final EIS 2-4 Figure 2.1-1. Close-up of Alternative Study Corridors Near Sahuarita and Green Valley. Chapter 2- Proposed Action and Alternatives 2-5 Figure 2.1-2. Close-up of Alternative Study Corridors Near Amado. TEP Sahuarita-Nogales Transmission Line Final EIS 2-6 Figure 2.1-3. Close-up of Alternative Study Corridors Near Nogales. TEP Sahuarita-Nogales Transmission Line Final EIS 2-8 Figure 2.1-4. Western Corridor on the Coronado National Forest. Chapter 2-Proposed Action and Alternatives 2-13 Figure 2.1-5. Central Corridor on the Coronado National Forest. Chapter 2-Proposed Action and Alternatives 2-15 Figure 2.1-6. Crossover Corridor on the Coronado National Forest. TEP Sahuarita-Nogales Transmission Line Final EIS

211

Abstract--This paper proposes an optimization based method of planning reactive power control for electric transmission  

E-Print Network (OSTI)

for electric transmission systems to endow them with the capability of being reconfigured to a secure of the electric transmission system. There are three basic options for strengthening transmission systems: (1-term planning to strengthen transmission capability is necessary to increase future reliability levels

Kumar, Ratnesh

212

Definition of a Balancing Point for Electricity Transmission Contracts  

E-Print Network (OSTI)

exchanges of electricity”, Report for the European Commission, Directorate-General Energy and Transport Institute of Power Systems and Power Economics (IAEW) and CONSENTEC Consulting fur Energiewirtschaft und -technik, Aachen, “Analysis of Electricity...

Olmos, Luis; Neuhoff, Karsten

2004-06-16T23:59:59.000Z

213

Dynamics of electrical transmission at club endings on the Mauthner cells Alberto E. Peredaa,*, John E. Rashb  

E-Print Network (OSTI)

Review Dynamics of electrical transmission at club endings on the Mauthner cells Alberto E. Peredaa, the club endings, have historically provided a window for the study of electrical transmission data show that electrical transmission at these terminals is mediated by connexin35 (Cx35), the fish

Rash, John E.

214

Electricity transmission congestion costs: A review of recent reports  

E-Print Network (OSTI)

Market Report: New York Electricity Markets. April. PJM (PJM Interconnection, LLC).2002. PJM Interconnection State of the Market Report 2001.

Lesieutre, Bernard C.; Eto, Joseph H.

2003-01-01T23:59:59.000Z

215

ELECTRICITY TRANSMISSION IN DEREGULATED MARKETS; CONFERENCE AT CARNEGIE MELLON UNIVERSITY, PITTSBURGH PA USA DECEMBER 2004 1 A criticality approach to monitoring cascading  

E-Print Network (OSTI)

ELECTRICITY TRANSMISSION IN DEREGULATED MARKETS; CONFERENCE AT CARNEGIE MELLON UNIVERSITY the risk of cascading failure of electric power transmission systems as overall loading is increased failure is the usual mechanism for large blackouts of electric power transmission systems. For example

Dobson, Ian

216

Electricity transmission congestion costs: A review of recent reports  

E-Print Network (OSTI)

Transmission Grid Study. FERC (Federal Energy RegulatoryLuong and Udi Helman (FERC), Frances Wood (Onlocation),ii Acronyms CAISO CRR DOE ECP FERC FTR ISO ISO-NE LMP MW MWh

Lesieutre, Bernard C.; Eto, Joseph H.

2003-01-01T23:59:59.000Z

217

Power electronics in electric utilities: HVDC power transmission systems  

SciTech Connect

High Voltage Direct Current (HVDC) power transmission systems constitute an important application of power electronics technology. This paper reviews salient aspects of this growing industry. The paper summarizes the history of HVDC transmission and discusses the economic and technical reasons responsible for development of HVDC systems. The paper also describes terminal design and basic configurations of HVDC systems, as well as major equipments of HVDC transmission system. In this regard, the state-of-the-art technology in the equipments constructions are discussed. Finally, the paper reviews future developments in the HVDC transmission systems, including promising technologies, such as multiterminal configurations, Gate Turn-Off (GTO) devices, forced commutation converters, and new advances in control electronics.

Nozari, F.; Patel, H.S.

1988-04-01T23:59:59.000Z

218

Electricity transmission: an overview of the current debate  

E-Print Network (OSTI)

, FERC, pursued the implementation of a Standard Market Design and encouraging larger Regional Transmission Organisations to facilitate efficient trade over wider areas and transmission investment. In Europe, under prompting from the European... will soon be) implemented in some variation in several states in the US (e.g. PJM, New York, New England, Texas and California) and is a cornerstone of FERC’s proposed Standard Market Design. For short-run congestion management there is agreement that a...

Brunekreeft, Gert; Neuhoff, Karsten; Newbery, David

2006-03-14T23:59:59.000Z

219

Secretary Chu Announces Efforts to Strengthen U.S. Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chu Announces Efforts to Strengthen U.S. Electric Chu Announces Efforts to Strengthen U.S. Electric Transmission Networks Secretary Chu Announces Efforts to Strengthen U.S. Electric Transmission Networks December 18, 2009 - 12:00am Addthis Washington, DC-Energy Secretary Steven Chu announced today award selections for $60 million in funding from the American Recovery and Reinvestment Act to support transmission planning for the country's three interconnection transmission networks. The 6 awards will promote collaborative long-term analysis and planning for the Eastern, Western and Texas electricity interconnections, which will help states, utilities, grid operators, and others prepare for future growth in energy demand, renewable energy sources, and Smart Grid technologies. This represents the first-ever effort

220

A Comprehensive Approach for Computation and Implementation of Efficient Electricity Transmission Network Charges  

E-Print Network (OSTI)

This paper presents a comprehensive design of electricity transmission charges that are meant to recover regulated network costs. In addition, these charges must be able to meet a set of inter-related objectives. Most ...

Pérez-Arriaga, Ignacio J.

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Benchmarking and Regulation of Electricity Transmission and Distribution Utilities: Lessons from International Experience  

E-Print Network (OSTI)

Since the early 1980?s, many countries have implemented electricity sector reform, many of which have bundled generation, transmission, distribution and supply activities, and have introduced competition in generation and supply. An increasing...

Jamasb, Tooraj; Pollitt, Michael G.

2004-06-16T23:59:59.000Z

222

Electricity transmission investment in the United States : an investigation of adequacy  

E-Print Network (OSTI)

There is a prevailing sentiment that the United States is underinvested in its electric transmission infrastructure. The standard claim is that poor regulation has caused insufficient levels of capital to be devoted to the ...

Kwok, Peter Jordan

2010-01-01T23:59:59.000Z

223

Exotic electricity options and the valuation of electricity generation and transmission assets  

Science Conference Proceedings (OSTI)

Keywords: capacity valuation, electricity derivatives, electricity futures contract, exchange option, mean reversion, real options, spark spread

Shi-Jie Deng; Blake Johnson; Aram Sogomonian

2001-01-01T23:59:59.000Z

224

March 2009 Union for the Co-ordination of Transmission of Electricity CIM Interoperability Test  

Science Conference Proceedings (OSTI)

The Union for the Co-ordination of Transmission of Electricity (UCTE) and the Electric Power Research Institute (EPRI), along with European and American vendors and transmission system operators (TSOs), conducted one of the largest Common Information Model (CIM) interoperability (IOP) tests to date. The test, held March 23-27, 2009, in Paris, was organized by UCTE, directed by EPRI, and hosted by RTE (a TSO of France). This report describes the results of this testing, which is considered an important st...

2009-06-09T23:59:59.000Z

225

Electric Transmission Right-of-Way Invasive Non-Native Woody Plant Species Control  

Science Conference Proceedings (OSTI)

Invasive non-native woody plant species are a significant issue in the United States. Invasive woody plants are a particular concern for electric transmission right-of-way (ROW) managers. While invasive non-native woody plants have beneficial usesincluding erosion control, wildlife food and cover, and use as ornamentalsthey also have a notably negative impact on electric transmission ROWs. Negative impacts include reducing line clearance, reliability, and accessibility, and increasing vegetation manageme...

2006-03-27T23:59:59.000Z

226

Coordinating Interstate ElectricTransmission Siting: An Introduction...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

experts have started drawing att ention to the need to improve the system that transmits electricity from power plants to demand centers. Congestion on existing lines, increased...

227

Buildings Energy Data Book: 6.2 Electricity Generation, Transmission...  

Buildings Energy Data Book (EERE)

Conventional Wind Solar Thermal and Photovoltaic Wood and Wood Derived Fuels Geothermal Other Biomass Pumped Storage Other Total Source(s): EIA, Electric Power Annual 2010,...

228

The electric delivery system-a complex network of transmission and distribu  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

electric delivery system-a complex network of transmission and distribu- electric delivery system-a complex network of transmission and distribu- tion lines, substations, and electrical components-is aging. To deliver more electricity and ensure reliability, the grid needs to be modernized. As the grid is being upgraded, it is also being challenged by increased needs to integrate variable renewable energy resources such as solar and wind, the potential growth of electric vehicles and related charging infrastructure, and the potential development of new electricity market designs and operating practices. To help decision makers better understand how these changes and challenges are shaping electricity delivery systems, as well as provide the industry with the tools necessary to cope with the new designs, the Reliability and Markets activ-

229

PP-22-1 British Columbia Electric Company, Limited  

Energy.gov (U.S. Department of Energy (DOE))

Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border.

230

Electrical engineering Electricity  

E-Print Network (OSTI)

generation Transmission Distribution · Electrical generators · Electric motors · High voltage engineering associated with the systems Electrical engineering · Electric power generation Transmission Distribution The electricity transported to load locations from a power station transmission subsystem The transmission system

Ã?nay, Devrim

231

Transmission Management in the Aftermath of Electricity Restructuring in Turkey  

Science Conference Proceedings (OSTI)

In moving toward restructuring, transmission expansion planning is a major challenge. The authors offer a general perspective on TEP issues, then address the specific challenges in Turkey and propose several strategies toward managing physical and financial risks in that country. (author)

Tor, Osman Bulent; Shahidehpour, Mohammad

2006-08-15T23:59:59.000Z

232

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

233

A Service-Oriented Architecture for Electric Power Transmission System Asset Management  

E-Print Network (OSTI)

Modern electric power systems comprising of power transmission and distribution grids consist of a large in operating modern high-voltage electric power sys- tems. The proposed framework integrates real-time data of equipment. The failure of critical equipment can adversely impact the entire distribution grid and increase

Honavar, Vasant

234

Electric power transmission and distribution systems: costs and their allocation. Research report  

SciTech Connect

Transmission and distribution costs contribute significantly to the total costs of providing electrical service. The costs derived from the transmission and distribution (TandD) system have historically comprised about 2/3 the costs of producing and delivering electricity to residential-commercial customers, and over 1/3 the total costs supplying electricity to large industrial customers. This report: (1) estimates the differences in transmission and distribution equipment required to serve industrial and residential-commercial customers and allocates to the above two customer classes the average costs of installing this equipment; (2) estimates the costs of operation and maintenance of the transmission and distribution system, and allocates these costs to the customer classes; and (3) calculates the TandD derived average costs for the two customer classes. (GRA)

Baughman, M.L.; Bottaro, D.J.

1975-07-01T23:59:59.000Z

235

Electric Generating and Transmission Facilities – Emissions Management (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This section details responsibilities of the Iowa Utility Board, including the policies for electricity rate-making for the state of Iowa, certification of natural gas providers, and other policies...

236

NOTATION........................................................................................................................... vii 1 ELECTRICITY TRANSMISSION SYSTEM OVERVIEW......................................... 1  

E-Print Network (OSTI)

gallon reservoir, in a hot water bath, microcrystalline wax in keroser.e solutions and several crude Oil anvestigatea para::tr aepcsataon usng #12;-- 17 -- a deporsiion ce:Ll in a circulation loop as developed was maintained ac 2tt C ann clrcujatea tarougi. te deposition cell at the rate of 1.06 cm/S waich corresponcied

Argonne National Laboratory

237

U.S. Department of Energy 2012 National Electric Transmission Congestion Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 National Electric 12 National Electric Transmission Congestion Study Eastern Regional Workshop St. Louis, MO Rep. Tom Sloan, Kansas Congestion Means: Convergence of Political and Technological Limitations on Operation of Grid Price signal to incent investment in local generation or/and regional transmission or/and increased energy conservation investments An impediment to moving large amounts of lower-cost renewable energy to distant load centers An opportunity for the DOE to Partner with stakeholders on innovative programs to address the political impediments to alleviating congestion Commend DOE Efforts to Address Political Congestion: Reaching out to Lauren Azar and an RTO Engineer Carefully Considering DOE Electricity Advisory Committee Recommendations

238

Electrical Safety Practices of Underground Transmission Systems--2011 Update  

Science Conference Proceedings (OSTI)

Safety is of paramount importance in all areas of utility system operations. All utilities have safety practices and procedures in place to protect their workers and the public and are diligent about monitoring compliance. However, underground transmission cables present unique requirements that might not be covered in existing utility safety practices. This report addresses the grounding requirements and induced voltage calculation procedures that should be considered when performing operation, maintena...

2011-12-05T23:59:59.000Z

239

Abstract-Electricity transmission planning does not have a common solution worldwide, with most countries trusting on  

E-Print Network (OSTI)

Abstract- Electricity transmission planning does not have a common solution worldwide, with most issue in the restructuring of the electricity market all over the world. Transmission systems costs to the original 1982 regulatory framework, being transmission pricing and investment among the main issues

Rudnick, Hugh

240

PP-334 Energia Sierra Juarez U.S. Transmission, LLC  

Energy.gov (U.S. Department of Energy (DOE))

Presidential Permit authorizing Energia Sierra Juarez (ESJ) to construct, operate and maintain electric transmission facilities at the U.S. - Mexico border.

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Electrical Collection and Transmission Systems for Offshore Wind Power: Preprint  

SciTech Connect

The electrical systems needed for offshore wind farms to collect power from wind turbines--and transmit it to shore--will be a significant cost element of these systems. This paper describes the development of a simplified model of the cost and performance of such systems.

Green, J.; Bowen, A.; Fingersh, L.J.; Wan, Y.

2007-03-01T23:59:59.000Z

242

The integration of renewable energy sources into electric power transmission systems  

DOE Green Energy (OSTI)

Renewable energy technologies such as photovoltaics, solar thermal power plants, and wind turbines are nonconventional, environmentally attractive sources of energy that can be considered for electric power generation. Many of the areas with abundant renewable energy resources (very sunny or windy areas) are far removed from major load centers. Although electrical power can be transmitted over long distances of many hundreds of miles through high-voltage transmission lines, power transmission systems often operate near their limits with little excess capacity for new generation sources. This study assesses the available capacity of transmission systems in designated abundant renewable energy resource regions and identifies the requirements for high-capacity plant integration in selected cases. In general, about 50 MW of power from renewable sources can be integrated into existing transmission systems to supply local loads without transmission upgrades beyond the construction of a substation to connect to the grid. Except in the Southwest, significant investment to strengthen transmission systems will be required to support the development of high-capacity renewable sources of 1000 MW or greater in areas remote from major load centers. Cost estimates for new transmission facilities to integrate and dispatch some of these high-capacity renewable sources ranged from several million dollars to approximately one billion dollars, with the latter figure an increase in total investment of 35%, assuming that the renewable source is the only user of the transmission facility.

Barnes, P.R.; Dykas, W.P.; Kirby, B.J.; Purucker, S.L. [Oak Ridge National Lab., TN (United States); Lawler, J.S. [Univ. of Tennessee, Knoxville, TN (United States)

1995-07-01T23:59:59.000Z

243

Do Generation Firms in Restructured Electricity Markets Have Incentives to Support Social-Welfare-Improving Transmission Investments? *  

E-Print Network (OSTI)

Transmission Grid Study of the U.S. Department of Energy (Abraham, 2002) declares: "Growth in electricity of incentives for investment in the U.S. electricity transmission system are sparse. Moreover, noneDo Generation Firms in Restructured Electricity Markets Have Incentives to Support Social

Oren, Shmuel S.

244

152 IEEE TRANSACTIONS ON MICROWAVE THEORY AND TECHNIQUES, VOL. 53, NO. 1, JANUARY 2005 High-Speed Electrical Backplane Transmission  

E-Print Network (OSTI)

-Speed Electrical Backplane Transmission Using Duobinary Signaling Jeffrey H. Sinsky, Senior Member, IEEE, Marcus to binary. For 10-Gb/s data transmission, we demonstrate a bit error rate 10 13 through electrical backplane Duelk, Member, IEEE, and Andrew Adamiecki, Member, IEEE Abstract--High-speed electrical data

Palermo, Sam

245

PRE-STUDY COMMENTS OF IOWA UTILITIES BOARD ON DOE 2012 ELECTRIC TRANSMISSION CONGESTION STUDY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PRE-STUDY COMMENTS OF IOWA UTILITIES BOARD ON PRE-STUDY COMMENTS OF IOWA UTILITIES BOARD ON DOE 2012 ELECTRIC TRANSMISSION CONGESTION STUDY JANUARY 2012 The Iowa Utilities Board (Board) is pleased to provide these comments as the Department of Energy (DOE) commences its next transmission congestion study (2012). These comments are organized to give DOE a perspective on electric transmission issues in Iowa - transmission planning, congestion, and siting. Iowa has been a leader in wind generation installation as well as manufacturing of wind turbines. Iowa has the second most installed wind capacity of any state. Since the DOE 2009 congestion study, Iowa added 884 MW of wind generation in 2009 -2010. MidAmerican Energy Company (MidAmerican), an Iowa investor owned utility added 593.5 MW in 2011 and plans to

246

Electric Compressor Performance in Gas Transmission: Status Report -- November 2000  

Science Conference Proceedings (OSTI)

A project is nearing completion to evaluate a new technology, the HydroCom compressor valve actuator, for controlling flow on reciprocating compressors driven by electric motors in gas pipeline applications. The actuator is installed on suction valves on compressors and is controlled by a microprocessor to provide stepless capacity control of flow by allowing back flow through the suction valves near the start of each compression stroke. This technology provides similar control capability as an adjustabl...

2000-12-02T23:59:59.000Z

247

Transmission Siting Integrating National Corridor and North American Electric Reliability Corporation (NERC) Compliance Requirements  

Science Conference Proceedings (OSTI)

In national interest electric transmission corridors, the siting process for transmission and distribution rights-of-way follows Federal Energy Regulatory Commission (FERC) guidelines. As described in the FERC Permit Process, eminent domain proceedings are not the preferred method of obtaining rights-of-way. The permitting process is rather one of engaging the public through meetings and education to develop siting consensus. This approach requires an in-depth understanding of the primary technical issue...

2010-12-22T23:59:59.000Z

248

National Electric Transmission Study 2006 Western Interconnection Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Interconnection Western Interconnection 2006 Congestion Assessment Study Prepared by the Western Congestion Analysis Task Force May 08, 2006 2 Western Interconnection 2006 Congestion Study - DOE Task 3 - 1. 2008 Modeling Study 2. 2015 Modeling Study - 2015 Planned Resource Development (IRPs and RPS) 3. W.I. Historical Path Usage Studies - 1999 thru 2005 - Physical congestion - Commercial congestion 3 WCATF Modeling Studies ABB Gridview Model * Model uses WECC 2005 L&R load forecast, modified with NPCC data for the NW, RMATS load forecasts for the Rocky Mtn area and the latest CEC load forecast for California * Hourly load shapes were developed using FERC 714 * Incremental transmission was added to a WECC 2008 case to represent 2015 network topology * WECC path ratings were used, modified as necessary to more closely

249

Importance, Identification, and Assessment of Danger and Hazard Trees Located Outside Electric Transmission Line Rights-of-Way  

Science Conference Proceedings (OSTI)

Electric transmission line rights-of-way (ROWs) commonly pass through forested areas across North America. Trees from these forests could fall from outside the ROW into a transmission line and its security zone, potentially causing an outage. Most of the bulk transmission outages across the United States over the past decade have been caused by off-ROW trees. The North American Electric Reliability Corporation (NERC) developed standards for transmission vegetation management programs that strictly regul...

2010-11-22T23:59:59.000Z

250

Energy Landscapes: Coal Canals, Oil Pipelines, Electricity Transmission Wires in the Mid-Atlantic, 1820-1930.  

E-Print Network (OSTI)

??Coal canals, oil pipelines, and electricity transmission wires transformed the built environment of the American mid-Atlantic region between 1820 and 1930. By transporting coal, oil,… (more)

Jones, Christopher F.

2009-01-01T23:59:59.000Z

251

Electrical and mechanical design criteria for EHV and UHV: overhead transmission lines  

Science Conference Proceedings (OSTI)

The results are presented of a program devoted to the selection of electrical and mechanical design criteria and parameters for overhead power transmission lines for ac systems rated at from 345 to 1100 kV and for dc systems rated at from 600 to 1200 kV. Information is included on the environmental effects, i.e., audible noise and electric fields, of the lines, mechanical and economic requirements, safety, failures, grounding, and lightning protection. (LCL)

Not Available

1980-06-01T23:59:59.000Z

252

Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.  

SciTech Connect

The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

253

Market Opportunities for Electric Drive Compressors for Gas Transmission, Storage, and Processing  

E-Print Network (OSTI)

There is great interest in the large potential market for electric drives in the gas transmission, gas storage, and gas processing industries. Progressive electric utilities and astute vendors are moving to meet the needs of these industries as they confront rapid changes and new realities. New policy and economic considerations, brought on by changes in environmental and business regulations and new compressor/driver technology, are causing these gas industry companies to consider electric motors for replacement of older gas engines and for new compressor installations. In ozone nonattainment regions, bringing gas compressor stations into compliance with NOx emission regulations is a must. Outside those regions, new electric drives are being considered because of their improved operating efficiencies and lower costs. The Electric Power Research Institute (EPRI), working through the EPRI Chemicals and Petroleum Office, is providing leadership in the efforts to further dialogue among gas companies, electric utilities, and vendors. EN strategists is working closely with EPRI, the electric utilities, and the gas transmission companies to promote consideration of The Electric Option.

Parent, L. V.; Ralph, H. D.; Schmeal, W. R.

1995-04-01T23:59:59.000Z

254

Energy efficiency of information transmission by electrically coupled neurons  

E-Print Network (OSTI)

The generation of spikes by neurons is energetically a costly process. This paper studies the consumption of energy and the information entropy in the signalling activity of a model neuron both when it is supposed isolated and when it is coupled to another neuron by an electrical synapse. The neuron has been modelled by a four dimensional Hindmarsh-Rose type kinetic model for which an energy function has been deduced. For the isolated neuron values of energy consumption and information entropy at different signalling regimes have been computed. For two neurons coupled by a gap junction we have analyzed the roles of the membrane and synapse in the contribution of the energy that is required for their organized signalling. Computational results are provided for cases of identical and nonidentical neurons coupled by unidirectional and bidirectional gap junctions. One relevant result is that there are values of the coupling strength at which the organized signalling of two neurons induced by the gap junction takes place at relatively low values of energy consumption and the ratio of mutual information to energy consumption is relatively high. Therefore, communicating at these coupling values could be energetically the most efficient option.

Francisco J. Torrealdea; Cecilia Sarasola; Alicia d'Anjou; Abdelmalik Moujahid; N. Vélez de Mendizábal

2012-04-17T23:59:59.000Z

255

Assessment of Transmission Congestion for Major Electricity Markets in the US  

E-Print Network (OSTI)

the last few years has led to several structural and regulatory issues regarding transmission grid-7803-7173-9/01/$10.00 © 2001 IEEE 1152 #12;where, c,, (p,, )=Generation cost curve' B,, (p,, )=Benefitcurve for the demand >, p welfare function given by Equation ( 1) becomes total cost of supplying electricity. The demand

Ilic, Marija D.

256

Improving Electricity Resource-Planning Processes by Consideringthe Strategic Benefits of Transmission  

SciTech Connect

Current methods of evaluating the economic impacts of new electricity transmission projects fail to capture the many strategic benefits of these projects, such as those resulting from their long life, dynamic changes to the system, access to diverse fuels, and advancement of public policy goals to integrate renewable-energy resources and reduce greenhouse gas emissions.

Budhraja, Vikram; Mobasheri, Fred; Ballance, John; Dyer, Jim; Silverstein, Alison; Eto, Joseph

2009-03-02T23:59:59.000Z

257

El Paso electric 345 kV, Springerville to Deming, transmission line project, New Mexico  

SciTech Connect

Construction of a 213.5-mile, 345-kilovolt (kV) transmission line is proposed from the El Paso Electric Company Luna substation, 1.5 miles north of Deming, to a point on the existing Tucson Electric Power Company transmission line near Red Hill, in New Mexico. Counties in New Mexico that could be directly affected are Luna, Sierra, Socorro, Catron, and Grant. The proposed line would use wood towers, 51 to 55 feet high, placed at an average interval of 800 feet. More equipment would be added to the Luna substation, consisting of a 345-kV circuit breaker, two switches, a dead-end tower, and relay equipment. Communication and control would be provided through a microwave radio system. The transmission line would be paralleled by a two-track road for routine patrol. Estimated cost of the project is $42.9 million.

Not Available

1985-07-01T23:59:59.000Z

258

Calculation of electric field and audible noise from transmission lines with non-parallel conductors  

Science Conference Proceedings (OSTI)

In order to investigate the feasibility of using new transmission line configurations with non-parallel conductors, for managing magnetic field in critical areas, techniques are needed to assess the effects of different three-dimensional line arrangements on other important design parameters. A new method for calculation of electric field and corona-generated audible noise from non-parallel conductors is described and implemented as a computer tool. This method uses linearly varying line charges to simulate charge distribution along the axial direction of the transmission line. New algorithms are developed for calculating electric field and audible noise due to non-uniform line charges and illustrated by examples of low magnetic field transmission line designs.

Liu, Y. [Virginia Tech, Blacksburg, VA (United States); Zaffanella, L.E. [Enertech Consultants, Lee, MA (United States)

1996-07-01T23:59:59.000Z

259

Flexible gas insulated transmission line having regions of reduced electric field  

DOE Patents (OSTI)

A gas insulated transmission line having radially flexible field control means for reducing the electric field along the periphery of the inner conductor at predetermined locations wherein the support insulators are located. The radially flexible field control means of the invention includes several structural variations of the inner conductor, wherein careful controlling of the length to depth of surface depressions produces regions of reduced electric field. Several embodiments of the invention dispose a flexible connector at the predetermined location along the inner conductor where the surface depressions that control the reduced electric field are located.

Cookson, Alan H. (Pittsburgh, PA); Fischer, William H. (Wilkins Township, Allegheny County, PA); Yoon, Kue H. (Pittsburgh, PA); Meyer, Jeffry R. (Penn Hills Township, Allegheny County, PA)

1983-01-01T23:59:59.000Z

260

Direct optoelectronic generation and detection of sub-ps-electrical pulses on sub-mm-coaxial transmission lines  

E-Print Network (OSTI)

-mm-coaxial transmission lines Tae-In Jeona) and D. Grischkowskyb) School of Electrical and Computer Engineering, OklahomaDirect optoelectronic generation and detection of sub-ps-electrical pulses on sub efficient direct optoelectronic generation of sub-ps-THz pulses on 50 coaxial transmission lines with a 330

Oklahoma State University

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

262

Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning  

DOE Green Energy (OSTI)

The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).

Milligan, M.; Ela, E.; Hein, J.; Schneider, T.; Brinkman, G.; Denholm, P.

2012-06-01T23:59:59.000Z

263

1 Lossy Electric Transmission Line Soft Fault Diagnosis: an Inverse Scattering Approach  

E-Print Network (OSTI)

Abstract—In this paper, the diagnosis of soft faults in lossy electric transmission lines is studied through the inverse scattering approach. The considered soft faults are modeled as continuous spatial variations of distributed characteristic parameters of transmission lines. The diagnosis of such faults from reflection and transmission coefficients measured at the ends of a line can be formulated as an inverse problem. The relationship between this inverse problem and the inverse scattering theory has been studied by Jaulent in 1982 through transformations from the telegrapher’s equations of transmission lines to Zakharov-Shabat equations. The present paper clarifies and completes the computation of the theoretic scattering data required by the inverse scattering transform from the practically measured engineering scattering data. The inverse scattering method is then applied to numerically simulated lossy transmission lines to confirm the feasibility of the studied approach to soft fault diagnosis. Index Terms—inverse scattering, lossy transmission line, soft fault diagnosis, telegrapher’s equations, Zakharov-Shabat equations. I.

Huaibin Tang; Qinghua Zhang

2010-01-01T23:59:59.000Z

264

Management of Riparian Areas on Electric Transmission Line Rights-of-Way  

Science Conference Proceedings (OSTI)

Electric transmission line rights-of-way (ROWs) commonly cross streams, rivers, ponds, and lakes. Plant communities along the edges of these water resources are important because of their role in soil conservation and habitat diversity as well as the influence they have on fauna and aquatic ecosystems. The area of vegetation affected by the water-based habitatand that in turn affects the wateris the riparian area. This report provides guidance on the definition and management considerations for riparian ...

2011-12-14T23:59:59.000Z

265

Relative Risk Model for Transmission and Distribution Electric Infrastructure (General RRM) Version 1.0  

Science Conference Proceedings (OSTI)

The General Relative Risk Model (RRM) is a decision support tool that provides a platform for the assessment of relative risks (human, ecological, and financial) associated with releases of dielectric fluids from a wide range of transmission and distribution (T&D) electrical equipment.  The General RRM is designed to model the relative risk of a given equipment portfolio (i.e., a user-defined grouping of T&D equipment) owned and operated by a utility.  The General RRM evaluates the ...

2012-11-28T23:59:59.000Z

266

30-MJ superconducting magnetic energy storage for electric-transmission stabilization  

DOE Green Energy (OSTI)

The Bonneville Power Administration operates the electric power transmission system that connects the Pacific Northwest and southern California. The HVAC interties develop 0.35 Hz oscillations when the lines are heavily loaded. A 30 MJ (8.4 kWh) Superconducting Magnetic Energy Storage (SMES) unit with a 10 MW converter can provide system damping for the oscillation. The unit is scheduled for installation in 1982 and operation in 1982-83. Status of the project is described. The conductor has been fully tested electrically and mechanically and the 5 kA superconducting cable has been produced. The 30 MJ superconducting coil is essentially complete. All major components of the electrical and cryogenic systems except the nonconducting dewar have been completed. The refrigerator and converter are undergoing tests. The system is to be located at the BPA Tacoma Substation and operated by microwave link from Portland, OR.

Turner, R.D.; Rogers, J.D.

1981-01-01T23:59:59.000Z

267

Semi-flexible gas-insulated transmission line using electric field stress shields  

DOE Patents (OSTI)

A gas-insulated transmission line includes an outer sheath, an inner conductor, an insulating gas electrically insulating the inner conductor from the outer sheath, and insulating supports insulatably supporting the inner conductor within the outer sheath. The inner conductor is provided with flexibility by use of main conductor sections which are joined together through a conductor hub section and flexible flexing elements. Stress shields are provided to control the electric field at the locations of the conductor hub sections where the insulating supports are contacting the inner conductor. The flexing elements and the stress shields may also be utilized in connection with a plug and socket arrangement for providing electrical connection between main conductor sections. 10 figs.

Cookson, A.H.; Dale, S.J.; Bolin, P.C.

1982-12-28T23:59:59.000Z

268

Semi-flexible gas-insulated transmission line using electric field stress shields  

DOE Patents (OSTI)

A gas-insulated transmission line includes an outer sheath, an inner conductor, an insulating gas electrically insulating the inner conductor from the outer sheath, and insulating supports insulatably supporting the inner conductor within the outer sheath. The inner conductor is provided with flexibility by use of main conductor sections which are joined together through a conductor hub section and flexible flexing elements. Stress shields are provided to control the electric field at the locations of the conductor hub sections where the insulating supports are contacting the inner conductor. The flexing elements and the stress shields may also be utilized in connection with a plug and socket arrangement for providing electrical connection between main conductor sections.

Cookson, Alan H. (Churchill Borough, PA); Dale, Steinar J. (Monroeville, PA); Bolin, Philip C. (Wilkins Township, Allegheny County, PA)

1982-12-28T23:59:59.000Z

269

Plan for Conduct of 2012 Electric Transmission Congestion Study: Federal Register Volume 76, No. 218 - Nov. 10, 2011  

Energy.gov (U.S. Department of Energy (DOE))

Section 216(a)(1) of the Federal Power Act (FPA) requires the Department of Energy to complete a study of electric transmission congestion every three years. The Department initiated preparations...

270

Pressurization Tests on High-Pressure Fluid-Filled Underground Transmission Cables of Public Service Electric & Gas Company  

Science Conference Proceedings (OSTI)

This report describes pressurization tests performed on 138-kV and 230-kV high-pressure fluid-filled (HPFF) transmission cable samples. The samples were removed from two Public Service Electric & Gas Company (PSE&G) underground transmission lines.

2009-12-10T23:59:59.000Z

271

Overhead electric power transmission line jumpering system for bundles of five or more subconductors  

DOE Patents (OSTI)

Jumpering of electric power transmission lines at a dead end tower. Two transmission line conductor bundles each contain five or more spaced apart subconductors (5) arranged in the shape of a cylinder having a circular cross section. The ends of each bundle of subconductors are attached with insulators to a dead end tower (1). Jumpering allows the electric current to flow between the two bundles of subconductors using jumper buses, internal jumper conductors, and external jumper conductors. One or more current collecting jumper buses (37) are located inside each bundle of subconductors with each jumper bus being attached to the end of a subconductor. Small-diameter internal jumper conductors (33) are located in the inherently electrically shielded area inside each bundle of subconductors with each subconductor (except ones having an attached jumper bus) having one internal jumper conductor connected between that subconductor's end and a jumper bus. Large-diameter external jumper conductors (9) are located outside each bundle of subconductors with one or more external jumper conductors being connected between the jumper buses in one bundle of subconductors and the jumper buses in the other bundle.

Winkelman, Paul F. (Beaverton, OR)

1982-01-01T23:59:59.000Z

272

The Vacuum Decay and the Transmission Resonances in Space-Dependent Electric Fields  

E-Print Network (OSTI)

We investigate the decay of Quantum electrodynamical (QED) vacuum in arbitrary space-dependent electric fields. In particular, we analyze the resonance peaks of the positron emission spectrum for the external fields with subcycle structure. For this, we study the transmission probability in the framework of scattering approach to vacuum pair production. In under-the-barrier scattering regime, we show that the width of a transmission resonance can be enhanced when the effective scattering potential contains multiple wells. Such a broadening in the resonance width corresponds to a decrease in the tunneling time. This may be relevant for observing the vacuum decay at shorter timescales before the external field is adiabatically turned off. In above-the-barrier scattering regime, we give a set of coupled differential equations for the numerical computation of the Bogoliubov coefficients.

Cesim K. Dumlu

2013-11-19T23:59:59.000Z

273

Modelling Quantum Mechanics by the Quantumlike Description of the Electric Signal Propagation in Transmission Lines  

E-Print Network (OSTI)

It is shown that the transmission line technology can be suitably used for simulating quantum mechanics. Using manageable and at the same time non-expensive technology, several quantum mechanical problems can be simulated for significant tutorial purposes. The electric signal envelope propagation through the line is governed by a Schrodinger-like equation for a complex function, representing the low-frequency component of the signal, In this preliminary analysis, we consider two classical examples, i.e. the Frank-Condon principle and the Ramsauer effect.

R. Fedele; M. A. Man'ko; V. I. Man'ko; V. G. Vaccaro

2002-07-30T23:59:59.000Z

274

ANUEADflM-31 Electric Power High-Voltage Transmission Lines:  

Office of Scientific and Technical Information (OSTI)

ANUEADflM-31 ANUEADflM-31 Electric Power High-Voltage Transmission Lines: Design Options, Cost, and Electric and Magnetic Field Levels by J.B. Stoffel,' E.D. Pentecost, R.D. Roman, and P.A. Traczyk Environmental Assessment Division, Argonne National Laboratory, 9700 South Cass Avenue, Argonne, Illinois 60439 November 1994 Work sponsored by United States Department of Energy, Assistant Secretary for Fossil Energy, Office of Fuels Program Stoffel is affiliated with Argonne's Electronics and Computing Technologies Division. D4SlRlBUTlON OF THIS DOCUMENT IS UNLiMltEb - . - . - . - . ... - , . ^ ~ .. , . . . , . . _ I T h i s report i s printed on recycled paper. @ . . .. . ' . . . A :_ - .. ., . . DISCLAIMER This report was .prepared as an account of work sponsored by an agency of the United States Government. Neither

275

Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission  

E-Print Network (OSTI)

benefits from the proposed transmission project c. Modifyingover time from the new transmission uses e. Assessing otherthe Strategic Benefits of Transmission Vikram Budhraja, Fred

Budhraja, Vikram

2010-01-01T23:59:59.000Z

276

Propagation of Front Waves in Myelinated Nerve Fibres: New Electrical Transmission Lines Constituted of Linear and Nonlinear Portions  

Science Conference Proceedings (OSTI)

In this paper, the authors examine the propagation of wave fronts in myelinated nerve fibres and applications as electrical transmission lines constituted of linear and nonlinear portions. Numerical simulations show that the front introduced in the nonlinear ... Keywords: Demyelination, Electrical Line, Front Wave, Myelinated Fibre, Regenerative, Remyelination

Aïssatou Mboussi Nkomidio; Paul Woafo

2011-01-01T23:59:59.000Z

277

Bulk Power System Dynamics and Control -VI, August 22-27, 2004, Cortina d'Ampezzo, Italy Transmission Investment in Competitive Electricity Markets  

E-Print Network (OSTI)

Transmission Investment in Competitive Electricity Markets Javier Contreras George Gross E.T.S. de Ingenieros of the transmission network were in the hands of a single central entity. However, the unbundling of the electricity Industriales Department of Electrical and Computer Engineering Universidad de Castilla ­ La Mancha University

Gross, George

278

Electric utility transmission and distribution upgrade deferral benefits from modular electricity storage : a study for the DOE Energy Storage Systems Program.  

DOE Green Energy (OSTI)

The work documented in this report was undertaken as part of an ongoing investigation of innovative and potentially attractive value propositions for electricity storage by the United States Department of Energy (DOE) and Sandia National Laboratories (SNL) Electricity Storage Systems (ESS) Program. This study characterizes one especially attractive value proposition for modular electricity storage (MES): electric utility transmission and distribution (T&D) upgrade deferral. The T&D deferral benefit is characterized in detail. Also presented is a generalized framework for estimating the benefit. Other important and complementary (to T&D deferral) elements of possible value propositions involving MES are also characterized.

Eyer, James M. (Distributed Utility Associates, Inc., Livermore, CA)

2009-06-01T23:59:59.000Z

279

Analysis of the reasons for accidents and of protective measures against induced voltage on aerial electrical transmission lines  

SciTech Connect

The problem of safety during work on aerial transmission lines under an induced voltage is examined. Results are presented from a study of the causes of accidents over the last 20 years in electrical grids in this country. A determination of different levels of induced voltage on disconnected aerial transmission lines as a function of their grounding scheme is proposed. The order of magnitudes for each level are given, along with approximate expressions for calculating them.

Misrikhanov, M. Sh. [MES Tsentra (Russian Federation); Mirzaabdullaev, A. O. [Branch of JSC 'FSK EES'- Nizhegorodskoe PMES (Russian Federation)

2009-01-15T23:59:59.000Z

280

CCPG Update U.S. Department Of Energy 2012 National Electric Transmission Congestion  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CCPG Update CCPG Update U.S. Department Of Energy 2012 National Electric Transmission Congestion Study Workshop - Portland, OR December 13, 2011 Susan Henderson, P.E. Xcel Energy Path/TOT Ratings  TOT 1A - none  TOT 2A - none  TOT 3 ◦ Archer-Wayne Child Interconnection (150MW, 345kV) ◦ High Plains Express (500kV, 1600-8000MW) ◦ Zephyr (500kV DC, 3000MW) ◦ TransWest Express (600kV DC, 3000MW) ◦ Colorado-Wyoming Intertie (345kV, 800MW)  Reference: WECC Path Reports & Rating Catalog Planned Projects w/Path Impact)  TOTs 1A, 2A, and 3 are historically congested, however this is changing with new resources added along front range.  WECC 2019 & 2020 studies show no congestion issues along these paths - unless a large build out of WY

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

2012 National Electric Transmission Congestion Study Workshop … December 13, 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study Portland Workshop December 13, 2011 Steve Oxley Deputy Chairman Wyoming Public Service Commission 2 There are two kinds of congestion Type 1: Competitive access to least-cost energy, many sellers vying to serve lucrative markets. Type 2: "Real" physical congestion - characterized by the inability to transmit all available generation. (Type 2a: We can expect the cumulative effect of new EPA rules to make a significant difference on where and how much* congestion we will see. * probably more of each 3 Wyoming is an energy and electron exporting state We are concerned with Type II congestion. We are energy rich, with high quality wind, natural gas and low sulfur coal resources, but . .

282

Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission  

E-Print Network (OSTI)

Tehachapi wind and transmission line development, the 4.8-cost of the Tehachapi transmission line is estimated to be $14% of the cost of the transmission line. While it can be

Budhraja, Vikram

2010-01-01T23:59:59.000Z

283

Application for Presidential Permit OE Docket No. PP-334 Energia Juarez U.S. Transmission, LLC,: Record of Decision  

Energy.gov (U.S. Department of Energy (DOE))

DOE announces its decision to issue a Presidential Permit to Energia Sierra Juarez U.S, Transmission, LLC (ESJ) to construct, operate and maintain electric transmission facilities at the U.S. -...

284

Buildings Energy Data Book: 6.2 Electricity Generation, Transmission, and Distribution  

Buildings Energy Data Book (EERE)

7 7 Characteristics of New and Stock Generating Capacities, by Plant Type Total Capital Costs Size Overnight Costs (2) of Typical New Plant New Plant Type (MW) (2010 $/kW) ($2010 million) Scrubbed Coal 1300 2809 3652 Integrated Coal-Gasification Combined Cycle (IGCC) 1200 3182 3818 IGCC w/Carbon Sequestration 520 5287 2749 Conv. Gas/Oil Combined Cycle 540 967 522 Adv. Gas/Oil Combined Cycle 400 991 396 Conv. Combustion Turbine 85 961 82 Adv. Combustion Turbine 210 658 138 Fuel Cell 10 6752 68 Advanced Nuclear 2236 5275 11795 Municipal Solid Waste 50 8237 412 Conventional Hydropower (3) 500 2221 1111 Wind 100 2409 241 Stock Plant Type 2010 2015 2020 2025 2030 2035 Fossil Fuel Steam Heat Rate (Btu/kWh) Nuclear Energy Heat Rate (Btu/kWh) Note(s): Source(s): 1) Plant use of electricity is included in heat rate calculations; however, transmission and distribution losses of the electric grid are excluded.

285

"Investigating the way national grid controllers visualize the electricity transmission grid using a neuro-linguistic programming (NLP) approach"  

Science Conference Proceedings (OSTI)

Highly skilled South African experts are responsible for controlling the voltage levels of the electrical transmission grid. This paper reports on the research methodology, which was used to identify the mental structure of their expertise. The research ... Keywords: human factors, mental models, naturalistic decision making, neuro-linguistic programming (NLP), visualization

P. Lazanas

2007-07-01T23:59:59.000Z

286

A versatile three-contact electrical biasing transmission electron microscope specimen holder for electron holography and electron tomography of working devices  

E-Print Network (OSTI)

A versatile three-contact electrical biasing transmission electron microscope specimen holder to characterize nanoscale materials and devices under operating conditions in the transmission electron microscope in the transmission electron microscope (TEM) at a spatial resolution that can approach the nanometer scale

Dunin-Borkowski, Rafal E.

287

In situ transmission electron microscopy study of electric-field-induced microcracking in single crystal Pb,,Mg13Nb23...O3 PbTiO3  

E-Print Network (OSTI)

In situ transmission electron microscopy study of electric-field-induced microcracking in single March 2000; accepted for publication 2 May 2000 In this letter, we report in situ transmission electron microscopy TEM study of effect of a cyclic electric field on microcracking in a single crystal piezoelectric

Chen, Haydn H.

288

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

289

Buildings Energy Data Book: 6.2 Electricity Generation, Transmission, and Distribution  

Buildings Energy Data Book (EERE)

4 4 Electric Conversion Factors and Transmission and Distribution (T&D) Losses Average Utility Average Utility Growth Rate Delivery Efficiency (1, 2) Delivery Ratio (Btu/kWh) (2, 3) (2010-year) 1980 29.4% 1981 29.9% 1982 29.7% 1983 29.8% 1984 30.5% 1985 30.4% 1986 30.8% 1987 31.1% 1988 31.1% 1989 30.2% 1990 30.3% 1991 30.5% 1992 30.7% 1993 30.6% 1994 30.9% 1995 30.7% 1996 30.7% 1997 30.8% 1998 30.7% 1999 30.6% 2000 30.7% 2001 31.1% 2002 31.1% 2003 31.3% 2004 31.3% 2005 31.5% 2006 31.7% 2007 31.8% 2008 31.8% 2009 32.2% 2010 32.3% 2011 32.1% 2012 32.4% 2013 32.7% 2014 33.0% 2015 33.1% 2016 33.2% 2017 33.1% 2018 33.1% 2019 33.1% 2020 33.1% 2021 33.2% 2022 33.2% 2023 33.2% 2024 33.2% 2025 33.1% 2026 33.2% 2027 33.3% 2028 33.4% 10,218 0.2% 10,294 0.2% 10,266 0.2% 10,247 0.2% 10,277 0.2% 10,291 0.2% 10,281 0.2% 10,300 0.3% 10,301 0.3% 10,282 0.3% 10,292 0.4% 10,310 0.4% 10,305

290

Public Technical Conference on DOE Congestion Study and Criteria for Designation of National Interest Electric Transmission Corridors  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Conference Technical Conference DOE Congestion Study and Criteria Designation of National Interest Electric Transmission Corridors March 29, 2006 Comments of Edward D. Tatum, Jr. Old Dominion Electric Cooperative Constraint Area and Corridor Designation * Corridors need to be "just right" * Too broad a designation could frustrate Congress' intent to facilitate licensing * Identify specific facilities rather than a family of alternatives - Too many; too long - Recognize impact on existing facilities Constraint Area and Corridor Designation * Existing infrastructure points with generalized paths between * Need "off ramps" * Opportunity to upgrade existing facilities or utilize existing ROW * Need to deliver into congested area * Provide States necessary opportunity for final

291

California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning  

Science Conference Proceedings (OSTI)

The California Energy Commission directed the Consortium for Electric Reliability Technology Solutions to analyze possible future scenarios for the California electricity system and assess transmission research and development (R&D) needs, with special emphasis on prioritizing public-interest R&D needs, using criteria developed by the Energy Commission. The scenarios analyzed in this report are not predictions, nor do they express policy preferences of the project participants or the Energy Commission. The public-interest R&D needs that are identified as a result of the analysis are one input that will be considered by the Energy Commission's Public Interest Energy Research staff in preparing a transmission R&D plan.

Eto, Joseph; Stovall, John P.

2003-04-01T23:59:59.000Z

292

Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission  

E-Print Network (OSTI)

to equitable recovery of project costs. Our research hasrules, transmission project costs are spread over all userspercentage of total project cost. Experts in the management

Budhraja, Vikram

2010-01-01T23:59:59.000Z

293

Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.  

Science Conference Proceedings (OSTI)

Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

294

Record of Categorical Exclusion (CS) Determination, Office of Electricity Delivery and Energy Reliability (OE): PP-366 Twin Rivers Paper Company, Inc.  

Energy.gov (U.S. Department of Energy (DOE))

Presidential Permit authorizing Twin Rivers Paper Company, Inc. to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. Record of Categorical Exclusion

295

Does More international transmission capacity increase competition in the Belgian electricity market?  

SciTech Connect

From a national market perspective, taking transmission capacity into account reduces current concentration measures, although they remain fairly high even after substantial capacity increases. From an international perspective, a more efficient use of current transmission capacity by coupling regional markets can increase competition. That suggests it may not be appropriate to assess market concentration using national market shares. (author)

Kuepper, Gerd; Delarue, Erik; Delvaux, Bram; Meeus, Leonardo; Bekaert, David; Willems, Bert; Proost, Stef; D'haeseleer, William; Deketelaere, Kurt; Belmans, Ronnie

2009-01-15T23:59:59.000Z

296

MAP 5.50: PJM Service Area in Virginia PJM operates the electric transmission system in Virginia served by Allegheny Power (AP), American  

E-Print Network (OSTI)

(DOM), as shown on MAP 5.50. The transmission system in Virginia delivers power to customers from native generation resources and power transfers across tie-line facilities with the rest of the PJM and other adjoining systems to the west and south. Critical RTEP Issues in Virginia PJM continues to address a number of issues with a bearing on reliability in Virginia and the regional transmission expansion plans required to maintain it: A new 502 Junction-Mt. Storm-Meadowbrook-Loudoun 500kV transmission line is needed to avoid reliability criteria violations in 2011 and maintain power transfers to serve northern

unknown authors

2007-01-01T23:59:59.000Z

297

EIS-0285: Transmission System Vegetation Management Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

285: Transmission System Vegetation Management Program 285: Transmission System Vegetation Management Program EIS-0285: Transmission System Vegetation Management Program SUMMARY Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure I-1). The seven states offer a great diversity of vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and neighboring members of the public, and interfere with our ability to maintain these facilities. We need to keep vegetation a safe distance away from our electric power facilities and control noxious weeds at our

298

Buildings Energy Data Book: 6.2 Electricity Generation, Transmission, and Distribution  

Buildings Energy Data Book (EERE)

5 5 2010 Impacts of Saving an Electric Quad (1) Utility Average-Sized Aggregate Number of Units Fuel Input Utility Unit (MW) to Provide the Fuel's Share Plant Fuel Type Shares (%) in 2010 of the Electric Quad (2) Coal 49% 36 Petroleum 1% 96 Natural Gas 19% 141 Nuclear 22% 3 Renewable (3) 10% 184 Total 100% 460 Note(s): Source(s): EIA, Electric Power Annual 2010, Feb. 2012, Table 1.2; and EIA, Annual Energy Outlook 2012 Early Release, Jan. 2012, Table A2 for consumption and Table A8 for electricity supply. 245 17 85 1,026 22 1) This table displays the breakdown of electric power plants that could be eliminated by saving an electric quad, in exact proportion to the actual primary fuel shares for electricity produced nationwide in 2010. Use this table to estimate the avoided capacity implied by saving one

299

Testing of T-odd, P-even interactions by nonpolarized neutron transmission through a nonpolarized nuclear target placed into electric field  

E-Print Network (OSTI)

A new possibility for the study of time-reversal violation is described. It consists in measurement of nonpolarized neutron transmission through nonpolarized nuclear target placed into electric field

V. G. Baryshevsky

2003-12-01T23:59:59.000Z

300

Reliability by design in distributed power transmission networks  

Science Conference Proceedings (OSTI)

The system operator of a large power transmission network must ensure that power is delivered whenever there is demand in order to maintain highly reliable electric service. To fulfill this mandate, the system operator must procure reserve capacity to ... Keywords: Inventory theory, Networks, Optimization, Power transmission

Mike Chen; In-Koo Cho; Sean P. Meyn

2006-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors  

Energy.gov (U.S. Department of Energy (DOE))

WASHINGTON, DC - U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability Kevin M. Kolevar today announced the Department's designation of two National...

302

Method to Detect and Measure Potential Market Power Caused by Transmission Network Congestions on Electricity Markets.  

E-Print Network (OSTI)

?? This thesis is based on studies of the deregulated electricity markets located in the United States of America. The problem statement of the thesis… (more)

Elfstadius, Martin

2008-01-01T23:59:59.000Z

303

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Usage Transmission Transmission Once electricity is generated -- whether by burning fossil fuels; through nuclear fission; or by harnessing wind, solar, geothermal, or hydro...

304

Development of control system for automatic mechanical transmission of battery electric bus  

Science Conference Proceedings (OSTI)

Due to the advantages of high efficiency, zero emission and good drivability, the battery electric vehicles (BEVs) promise to be one of the best choices to replace the oil fueled vehicle. In this paper a solution for the development of a control system ... Keywords: AMT, battery electric vehicle, control system, layered architecture, modular design

Hong-bo Liu; Yu-long Lei; Yu Zhang; Xiao-lin Zhang; You-de Li

2011-09-01T23:59:59.000Z

305

Transmission Expansion in Argentina 5: The Regional Electricity Forum of Buenos Aires Province  

E-Print Network (OSTI)

that adhered to the federal scheme 3 used for expansions and developments at 132 kV or lower, including low voltage grids, isolated generation in small towns, rural electrification and small hydroelectric power plants. Some 3893 km of 132 kV transmission...

Littlechild, Stephen C; Ponzano, Eduardo A

306

Interdependencies of Electricity Markets with Gas Markets A Case Study of Transmission System Operators  

E-Print Network (OSTI)

amount of LNG imported will depend crucially on the development of the natural gas reserves in the region distribution companies, transmission companies, liquefied natural gas importers, and associate member companies and the Natural Gas markets and the conditions and influences on both markets. Load-growth influences the need

Rudnick, Hugh

307

Computing Cournot Equilibria in Two Settlement Electricity Markets with Transmission Constraints  

Science Conference Proceedings (OSTI)

We formulate a two-settlement equilibrium in competitive electricity markets as a subgame-perfect Nash equilibrium in which each generation .rm solves a Mathematical Program with Equilibrium Constraints (MPEC), given other firms' forward and spot strategies. ...

2004-01-01T23:59:59.000Z

308

The Direction Forward -- Achieving Innovation in Electric Transmission: Highlights of a Workshop Held June 7, 8, and 9, 2011 in London, England  

Science Conference Proceedings (OSTI)

Transmission owners and operators have done an admirable job in maintaining reliability and moderating cost while managing substantive changes in power systems over the last few decades. However, there is a growing recognition among them that today's transmission system, based on conventional technology, will require the application of increasingly innovative devices and systems in order to be able to monitor, protect and automatically optimize the operation of an increasing array of interconnected eleme...

2011-12-30T23:59:59.000Z

309

Transmission grid extensions during the build-up of a fully renewable pan-European electricity supply  

E-Print Network (OSTI)

Spatio-temporal generation patterns for wind and solar photovoltaic power in Europe are used to investigate the future rise in transmission needs with an increasing penetration of these variable renewable energy sources (VRES) on the pan-European electricity system. VRES growth predictions according to the official National Renewable Energy Action Plans of the EU countries are used and extrapolated logistically up to a fully VRES-supplied power system. We find that keeping today's international net transfer capacities (NTCs) fixed over the next forty years reduces the final need for backup energy by 13% when compared to the situation with no NTCs. An overall doubling of today's NTCs will lead to a 26% reduction, and an overall quadrupling to a 33% reduction. The remaining need for backup energy is due to correlations in the generation patterns, and cannot be further reduced by transmission. The main investments in transmission lines are due during the ramp-up of VRES from 15% (as planned for 2020) to 80%. Add...

Becker, Sarah; Andresen, Gorm B; Schramm, Stefan; Greiner, Martin

2013-01-01T23:59:59.000Z

310

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

311

A Supply Chain Network Perspective for Electric Power Generation, Supply, Transmission, and Consumption  

E-Print Network (OSTI)

and less costly than older coal-fired power plants. In addition, technological advances in electricity, supply, trans- mission, and consumption is developed. The model is sufficiently general to handle the economics of power production. For example, new gas-fired combined cycle power plants are more effi- cient

Nagurney, Anna

312

Evaluating the potential impact of transmission constraints on the operation of a competitive electricity market in Illinois.  

SciTech Connect

Despite the current adequacy of the generation and transmission system in Illinois, there is concern that the uncertainties of electricity restructuring warrant a more detailed analysis to determine if there might be pitfalls that have not been identified under current conditions. The problems experienced elsewhere in the country emphasize the need for an evaluation of how Illinois might fare under a restructured electricity market. The Illinois Commerce Commission (ICC) commissioned this study to be undertaken as a joint effort by the University of Illinois at Urbana-Champaign and Argonne National Laboratory to evaluate the Illinois situation in the 2007 period when restructuring is scheduled to be fully implemented in the State. The purpose of this study is to make an initial determination if the transmission system in Illinois and the surrounding region would be able to support a competitive electricity market, would allow for effective competition to keep prices in check, and would allow for new market participants to effectively compete for market share. The study seeks to identify conditions that could reasonably be expected to occur that would enable a company to exercise market power in one or more portions of the State and thereby create undue pressure on the prices charged to customers and/or inhibit new market participants from entering the market. The term 'market power' has many different definitions, and there is no universal agreement on how to measure it. For the purposes of this study, the term is defined as the ability to raise prices and increase profitability by unilateral action. A more complete definition is provided later. With this definition, the central question of this analysis becomes: 'Can a company, acting on its own, raise electricity prices and increase its profits?' It should be noted that the intent of the study is not to predict whether or not such market power would be exercised by any company. Rather, it is designed to determine if a set of reasonably expected conditions could allow any company to do so. It should also be emphasized that this study is not intended to be a comprehensive evaluation of the electric power system in the State. Rather, it is intended to identify some issues that may impact the effective functioning of a competitive market.

Cirillo, R.; Thimmapuram, P.; Veselka, T.; Koritarov, V.; Conzelmann, G.; Macal, C.; Boyd, G.; North, M.; Overbye, T.; Cheng, X.; Decision and Information Sciences; Univ. of Illinois

2006-04-30T23:59:59.000Z

313

in the Era of Deregulation With Focus on Electrical Measurements for Transmission and Distribution  

E-Print Network (OSTI)

NIST invites your comments on this assessment of the measurement needs of the U.S. electric-power industry as that industry undergoes major changes during deregulation and seeks to adopt new technology. NIST regularly reassesses the needs of U.S. industries for measurement support in order to keep NIST’s programs focused on the highest priority requirements. Comments should be sent to:

Gerald J. Fitzpatrick; James K. Olthoff; Ronald M. Powell; James K. Olthoff; Gerald J. Fitzpatrick; James K. Olthoff; Ronald M. Powell

1997-01-01T23:59:59.000Z

314

Bulk Electricity System Impacts of Distributed and Transmission System Connected Solar PV  

Science Conference Proceedings (OSTI)

This report describes research examining how increased levels of photovoltaic (PV) can impact the bulk electricity system. Previous modeling of both bulk and distributed systems was extended to include more realistic assumptions, further sensitivities, and greater explanation of results. It was shown that high penetrations of distributed PV without low-voltage ride-through (LVRT) will increase voltage recovery time after a fault. The impact is exacerbated when the potential for residential ac ...

2012-12-31T23:59:59.000Z

315

Electric Transmission and Distribution Future R&D Needs Planning, Operation, Control, and Visualization  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27-28, 2013 27-28, 2013 Washington, DC FY13 DOE/CERTS Transmission Reliability R&D Internal Program Review Research Projects Reliability Standards Analysis and Assessments  Frequency Response Event Collection and Analysis  NERC Interconnections 2012 Annual Grid Reliability Performance Analysis and Report Page 1 Reliability Standards Analysis and Assessment  Objective: Collect grid data and conduct grid reliability performance analysis to support the NERC committees/groups (Resources Subcommittee and RS- Frequency Working Group) in the following ways: - Perform grid reliability metrics analysis using data collected in CERTS applications as requested by the RS - Analyze collected data to assess reliability performance at different levels - Interconnection, Reliability Coordinator, Balancing Authority

316

Essays on empirical analysis of multi-unit auctions -- impacts of financial transmission rights on the restructured electricity industry  

E-Print Network (OSTI)

This dissertation uses recently developed empirical methodologies for the study of multi-unit auctions to test the impacts of Financial Transmission Rights (FTRs) on the competitiveness of restructured electricity markets. FTRs are a special type of financial option that hedge against volatility in the cost of transporting electricity over the grid. Policy makers seek to use the prices of FTRs as market signals to incentivize efficient investment and utilization of transmission capacity. However, prices will not send the correct signals if market participants strategically use FTRs. This dissertation uses data from the Texas electricity market to test whether the prices of FTRs are efficient to achieve such goals. The auctions studied are multiunit, uniform-price, sealed-bid auctions. The first part of the dissertation studies the auctions on the spot market of the wholesale electricity industry. I derive structural empirical models to test theoretical predictions as to whether bidders fully internalize the effect of FTRs on profits into their bidding decisions. I find that bidders are learning as to how to optimally bid above marginal cost for their inframarginal capacities. The bidders also learn to bid to include FTRs into their profit maximization problem during the course of the first year. But starting from the second year, they deviated from optimal bidding that includes FTRs in the profit maximization problems. Counterfactual analysis show that the primary effect of FTRs on market outcomes is changing the level of prices rather than production efficiency. Finally, I find that in most months, the current allocations of FTRs are statistically equivalent to the optimal allocations. The second part of the dissertation studies the bidding behavior in the FTR auctions. I find that FTRs?? strategic impact on the FTR purchasing behavior is significant for large bidders ?? firms exercising market power in the FTR auctions. Second, trader forecasts future FTR credit very accurately while large generators?? forecasts of future FTR credit tends to be biased upward. Finally, The bid shading patterns are consistent with theoretical predictions and support the existence of common values.

Zang, Hailing

2005-08-01T23:59:59.000Z

317

Definition: Non-Firm Transmission Service | Open Energy Information  

Open Energy Info (EERE)

available. Also Known As Interruptible Load or Interruptible Demand Related Terms transmission lines, electricity generation, transmission line, firm transmission service,...

318

Buildings Energy Data Book: 6.2 Electricity Generation, Transmission, and Distribution  

Buildings Energy Data Book (EERE)

3 3 Electric Capacity Factors, by Year and Fuel Type (1) Conventional Coal Petroleum Natural Gas Nuclear Hydroelectric Solar/PV Wind Total 1990 59% 17% 23% 66% 45% 13% 18% 46% 1991 59% 18% 22% 70% 43% 17% 18% 46% 1992 59% 14% 22% 71% 38% 13% 18% 45% 1993 61% 16% 21% 70% 41% 16% 19% 46% 1994 61% 15% 22% 74% 38% 17% 23% 46% 1995 62% 11% 22% 77% 45% 17% 21% 47% 1996 65% 11% 19% 76% 52% 18% 22% 48% 1997 66% 13% 20% 72% 51% 17% 23% 48% 1998 67% 20% 23% 79% 47% 17% 20% 50% 1999 67% 20% 22% 85% 46% 15% 23% 51% 2000 70% 18% 22% 88% 40% 15% 27% 51% 2001 68% 20% 21% 89% 31% 16% 20% 48% 2002 69% 16% 18% 90% 38% 16% 27% 46% 2003 71% 21% 14% 88% 40% 15% 21% 44% 2004 71% 22% 16% 90% 39% 17% 25% 44% 2005 72% 22% 17% 89% 40% 15% 23% 45% 2006 71% 11% 19% 90% 42% 14% 27% 45% 2007 72% 12% 21% 92% 36% 14% 24% 45% 2008 71% 8% 20% 91% 37% 18% 26% 44% 2009 63% 7% 21% 90% 40% 16% 25% 42% 2010 (2) 65% 6% 23% 91% 37% 17% 29% 43% Note(s): Source(s) 1) EIA defines capacity factor to be "the ratio of the electrical energy produced by a generating unit for the period of time considered to the

319

Buildings Energy Data Book: 6.2 Electricity Generation, Transmission, and Distribution  

Buildings Energy Data Book (EERE)

2 2 Net Internal Demand, Capacity Resources, and Capacity Margins in the Contiguous United States (GW) Net Internal Capacity Capacity Demand (1) Resources (2) Margin (3) 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Note(s): Source(s): 778.5 980.3 20.6% 1) Net internal demand represents the system demand that is planned for by the electric power industry`s reliability authority and is equal to internal demand less direct control load management and interruptible demand. Direct control load management: Customer demand that can be interrupted at the time of the seasonal peak by direct control of the system operator by interrupting power supply to individual appliances or equipment on customer premises. This type of control usually reduces the demand of residential customers. Interruptible demand: Customer

320

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Cost Effectiveness of Cleaning Techniques for Controlling Human-based Transport of Invasive Exotic Plants on Electric Transmission Line Rights-of-Way  

Science Conference Proceedings (OSTI)

This Technical Update provides a broad overview of accomplishments over the first full year of the Electric Power Research Institute (EPRI) project to investigate the cost effectiveness of cleaning techniques to control human-based transport of invasive exotic plants on electric transmission line rights-of-way. One-half of the intended field work for the whole project (2012-2015) was completed, with attendant greenhouse and office work ongoing. EPRI expects the project to be completed in ...

2013-11-21T23:59:59.000Z

322

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

323

Downhole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2008-01-15T23:59:59.000Z

324

Buildings Energy Data Book: 6.2 Electricity Generation, Transmission, and Distribution  

Buildings Energy Data Book (EERE)

9 9 2009 Peak Load and Capacity Margin, Summer and Winter by NERC Region (MW) NERC Region Capacity Margin Capacity Margin TRE 16.7% 19.1% FRCC 6.0% 2.0% MRO (U.S.) 24.6% 26.8% NPCC (U.S.) 29.1% 43.2% RFC 25.2% 33.3% SERC 24.6% 26.2% SPP 16.4% 34.6% WECC 19.4% 29.6% U.S. TOTAL 22.2% 28.5% Note(s): Source(s): 128,245 109,565 725,958 668,818 1) Summer Demand includes the months of June, July, August, and September. 2) Winter Demand includes December of the previous year and January-March of the current year. 3) Capacity Margin is the amount of unused available capability of an electric power system at peak load as a percentage of net capacity resources. Net Capacity Resources: Utility- and IPP-owned generating capacity that is existing or in various stages of planning or construction, less inoperable capacity, plus planned capacity purchases from other resources, less planned

325

Longitudinal Load and Cascading Failure Risk Assessment (CASE): Central Louisiana Electric Cooperative's 500-kV Toledo-Coushatta Transmission Line  

Science Conference Proceedings (OSTI)

EPRI's Cascading Failure Risk Assessment (CASE) methodology was used to determine extreme event, unbalanced loads on Central Louisiana Electric Company's (CLECO) 500-kV, single circuit, Toledo-Coushatta transmission line. The methodology also identified the line's cascading potential under different loading conditions.

1998-03-11T23:59:59.000Z

326

Buildings Energy Data Book: 6.2 Electricity Generation, Transmission, and Distribution  

Buildings Energy Data Book (EERE)

6 6 Cost of an Electric Quad Used in the Buildings Sector ($2010 Billion) Residential Commercial Buildings Sector 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 11.82 11.82 11.82 11.94 11.68 11.82 10.59 10.83 10.70 11.41 11.58 11.48 11.68 11.33 11.51 11.49 10.77 11.15 11.71 11.67 11.69 11.72 11.52 11.63 10.57 9.76 10.19 10.55 9.73 10.16 11.16 10.35 10.78 10.68 9.90 10.31 10.42 9.48 9.97 10.16 9.20 9.70 10.57 9.73 10.17 10.48 9.62 10.07 9.54 8.46 9.01 9.24 8.11 8.68 9.92 8.97 9.47 9.85 8.78 9.33 9.16 8.44 8.81 9.32 8.58 8.96 9.15 8.16 8.66 9.46 8.64 9.05 10.27 9.34 9.82 10.24 9.27 9.76 9.28 8.48 8.89 9.56 8.77 9.18 11.92 10.52 11.25 11.83 10.40 11.14 10.61 9.76 10.19 10.86 9.60 10.25 11.90 10.08

327

Definition: Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Jump to: navigation, search Dictionary.png Transmission An interconnected group of lines and associated equipment for the movement or transfer of electric energy...

328

2012 National Electricity Forum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 U.S. Department of Energy U.S. Department of Energy National Electric Transmission Congestion Study Workshop - December 8, 2011 National Electric Transmission Congestion Study...

329

Transmission electron microscopy characterization of electrically stressed AlGaN/GaN high electron mobility transistor devices  

Science Conference Proceedings (OSTI)

A set of AlGaN/GaN high electron mobility transistor devices has been investigated using step-stress testing, and representative samples of undegraded, source-side-degraded, and drain-side-degraded devices were examined using electron microscopy and microanalysis. An unstressed reference sample was also examined. All tested devices and their corresponding transmission electron microscopy samples originated from the same wafer and thus received nominally identical processing. Step-stressing was performed on each device and the corresponding current voltage characteristics were generated. Degradation in electrical performance, specifically greatly increased gate leakage current, was shown to be correlated with the presence of crystal defects near the gate edges. However, the drain-side-degraded device showed a surface pit on the source side, and another region of the same device showed no evidence of damage. Moreover, significant metal diffusion into the barrier layer from the gate contacts was also observed, as well as thin amorphous oxide layers below the gate metal contacts, even in the unstressed sample. Overall, these observations emphasize that gate-edge defects provide only a partial explanation for device failure.

Johnson, Michael [Arizona State University; Cullen, David A [ORNL; Liu, Lu [University of Florida; Kang, Tsung Sheng [University of Florida, Gainesville; Ren, F. [University of Florida; Chang, C. Y. [University of Florida; Pearton, S. J. [University of Florida; Jang, Soohwan [University of Florida, Gainesville; Johnson, Wayne J. [Kopin Corporation, Taunton, MA; Smith, David J [Arizona State University

2012-01-01T23:59:59.000Z

330

Transmission Issues and Power Exchanges in Texas  

E-Print Network (OSTI)

The electric transmission system in Texas has evolved over the years to its present state, in order to provide reliable service and reduce the amount of reserve capacity any individual utility needs to maintain. Presently there is pressure on the transmission owning utilities by several parties, primary distribution cooperatives, cogenerators, and large industrial customers, to grant wider access to the system. This pressure is coming at a time when transmission lines are becoming increasingly difficult to build. This paper presents a historical background on the development of the transmission system and describes the problems of assessing the impact and properly pricing certain bulk power transactions. In addition, it briefly describes the Electro-Magnetic Fields problem and how it relates to new transmission line construction.

Hughes, H. L.

1992-04-01T23:59:59.000Z

331

NREL: Transmission Grid Integration - Glossary of Transmission...  

NLE Websites -- All DOE Office Websites (Extended Search)

system operator) An entity responsible for maintaining system balance, reliability, and electricity market operation. Load forecast A prediction of future demand. For normal...

332

The Benefits of Restructuring: It's Not Your Grandfather's Electric Utility Anymore  

Science Conference Proceedings (OSTI)

The key to achieving and maintaining most of the benefits from the emerging competitive market for electricity supply is to have a workably competitive wholesale generation market. By any objective measure, the PJM regional transmission organization is fulfilling its mission.

Switzer, Sheldon; Straub, Mary M.

2006-02-01T23:59:59.000Z

333

Office of Electricity Delivery and Energy Reliability, OE-20  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January, 2012 January, 2012 Office of Electricity Delivery and Energy Reliability, OE-20 U.S. Department of Energy 1000 Independence Avenue SW Washington, DC 20585 Greetings: The Wyoming Infrastructure Authority (WIA) hereby submits its initial comments on the 2012 National Electric Transmission Congestion Study (the 2012 Study). The WIA is an instrumentality of the State of Wyoming, created in 2004 by the Wyoming State Legislature and is tasked with "diversifying and expanding the Wyoming economy through improvements in the state's electric transmission infrastructure and to facilitate the consumption of Wyoming energy by planning, financing, constructing, developing, acquiring, maintaining and operating electric transmission facilities, advanced coal technology facilities, advanced energy technology facilities

334

El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment  

SciTech Connect

This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

Not Available

1992-04-01T23:59:59.000Z

335

Maintaining plant safety margins  

SciTech Connect

The Final Safety Analysis Report Forms the basis of demonstrating that the plant can operate safely and meet all applicable acceptance criteria. In order to assure that this continues through each operating cycle, the safety analysis is reexamined for each reload core. Operating limits are set for each reload core to assure that safety limits and applicable acceptance criteria are not exceeded for postulated events within the design basis. These operating limits form the basis for plant operation, providing barriers on various measurable parameters. The barriers are refereed to as limiting conditions for operation (LCO). The operating limits, being influenced by many factors, can change significantly from cycle to cycle. In order to be successful in demonstrating safe operation for each reload core (with adequate operating margin), it is necessary to continue to focus on ways to maintain/improve existing safety margins. Existing safety margins are a function of the plant type (boiling water reactor/pressurized water reactor (BWR/PWR)), nuclear system supply (NSSS) vendor, operating license date, core design features, plant design features, licensing history, and analytical methods used in the safety analysis. This paper summarizes the experience at Yankee Atomic Electric Company (YAEC) in its efforts to provide adequate operating margin for the plants that it supports.

Bergeron, P.A.

1989-01-01T23:59:59.000Z

336

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

337

PP-369 British Columbia Transmission Corporation and British Columbia Hydro  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PP-369 British Columbia Transmission Corporation and British PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Presidential Permit authorizing British Columbia Transmission Corporation and British Columbia Hydro and Power Authority to construct, operate,a dn maintain electric transmission facilities at the U.S. - Canada Border. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority More Documents & Publications PP-369 British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application to Amend Presidential Permit OE Docket No. PP-022-4 British

338

Cost Effectiveness of Cleaning Techniques for Controlling Human-based Transport of Invasive Exotic Plants on Electric Transmission L ine Rights-of-Way  

Science Conference Proceedings (OSTI)

This report provides a broad overview of accomplishments over the first 3 months of a project to define the cost effectiveness of cleaning techniques on electric transmission rights of way aimed at controlling the spread of invasive exotic (IE) vegetation. It includes the results of a brief literature search of cleaning techniques.BackgroundA science basis for process and procedure to cost effectively clean personnel and equipment so as to reduce the ...

2012-12-08T23:59:59.000Z

339

Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.  

DOE Green Energy (OSTI)

This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr. (,.Distributed Utility Associates, Livermore, CA)

2005-11-01T23:59:59.000Z

340

Patterns of transmission investment  

E-Print Network (OSTI)

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Transmission Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to...

342

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

343

Automated manual transmission controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

344

California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning  

E-Print Network (OSTI)

role for industry-led R&D activities. Note that thisAnalysis for PIER Transmission R&D Planning The highestfor public-interest R&D – i.e. , those that emerge as

Eto, Joseph; Stovall, John P.

2003-01-01T23:59:59.000Z

345

Current conflicts in U.S. Electric transmission planning, cost allocation and renewable energy policies: More heat than light?  

Science Conference Proceedings (OSTI)

To surmount obstacles to expanding and upgrading the nation's transmission system that are impeding development of the renewables sector, it is critical that these issues be resolved quickly and on a consistent rather than ad hoc basis. (author)

Bloom, David; Forrester, J. Paul; Klugman, Nadav

2010-12-15T23:59:59.000Z

346

FORMS AND INSTRUCTIONS FOR SUBMITTING ELECTRIC  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION FORMS AND INSTRUCTIONS FOR SUBMITTING ELECTRIC TRANSMISSION Instructions for Electric Transmission Forms ............................................................. 6 Electric transmission, transmission corridor, data request. #12;1 Background The California Energy

347

EIS-0231: Navajo Transmission Project | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31: Navajo Transmission Project 31: Navajo Transmission Project EIS-0231: Navajo Transmission Project SUMMARY This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 1, 1996 EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project

348

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Champlain Hudson Power Express Transmission Line Project, 7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City. Public Comment Opportunities None available at this time. Documents Available for Download December 6, 2013 EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York

349

Strong Polarization in the Optical Transmission through Elliptical Nanohole Arrays Department of Electrical and Computer Engineering, University of Victoria, P.O. Box 3055, Victoria, Canada, V8W 3P6  

E-Print Network (OSTI)

Strong Polarization in the Optical Transmission through Elliptical Nanohole Arrays R. Gordon* Department of Electrical and Computer Engineering, University of Victoria, P.O. Box 3055, Victoria, Canada, V transmission through nanohole arrays in metals. It is shown that the degree of polarization is determined

Brolo, Alexandre G.

350

Potential Benefits from Improved Energy Efficiency of Key Electrical Products: The Case of India  

E-Print Network (OSTI)

of electricity, and transmission and distribution losses asof electricity, and transmission and distribution losses astotal electricity consumption by distribution transformers

McNeil, Michael; Iyer, Maithili; Meyers, Stephen; Letschert, Virginie; McMahon, James E.

2005-01-01T23:59:59.000Z

351

Proceedings of the March 29, 2006 Conference for the 2006 National Electric Transmission Congestion Study - Session 1  

Energy.gov (U.S. Department of Energy (DOE))

A public technical conference on the 2006 congestion study and criteria for designating National Interest Electric Tranmission Corridors was held on March 29, 2006. 

352

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

353

Reliability and maintainability program  

SciTech Connect

The program's goals are to accelerate the adoption of active solar energy systems in building applications by improving the reliability and maintainability of installed systems. The project is designed to accomplish this by providing the latest information; by assisting the industry in improving reliability and maintainability; by assisting in design, manufacture, installation and maintenance of reliable and durable systems; and by assisting in the development of codes and standards. Work and accomplishments in these areas are enumerated. (LEW)

Eden, A.

1981-05-01T23:59:59.000Z

354

Particle trap to sheath contact for a gas-insulated transmission line having a corrugated outer conductor  

DOE Patents (OSTI)

A particle trap to outer elongated conductor or sheath contact for gas-insulated transmission lines. The particle trap to outer sheath contact of the invention is applicable to gas-insulated transmission lines having either corrugated or non-corrugated outer sheaths. The contact of the invention includes an electrical contact disposed on a lever arm which in turn is rotatably disposed on the particle trap and biased in a direction to maintain contact between the electrical contact and the outer sheath.

Fischer, William H. (Pittsburgh, PA); Cookson, Alan H. (Pittsburgh, PA); Yoon, Kue H. (Pittsburgh, PA)

1984-04-10T23:59:59.000Z

355

Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.  

SciTech Connect

This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr. (,.Distributed Utility Associates, Livermore, CA)

2005-11-01T23:59:59.000Z

356

Electric  

U.S. Energy Information Administration (EIA)

Average Retail Price of Electricity to ... Period Residential Commercial Industrial ... or usage falling within specified limits by rate ...

357

Transmission Line Workstation - Generation 2 (TLW-Gen2) v1.2: HVDC Electrical Effects - Version 1.0  

Science Conference Proceedings (OSTI)

This is a complete rewrite of the platform supporting the Transmission Line Workstation. The result is to provide a common platform to share data and support tools between existing and future T&S software. This release adds Vibration and OpenDSS Fault calculations to the initial TFlash and ACDC line ...

2013-11-21T23:59:59.000Z

358

Draft Chapter 4: Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A robust interstate electric transmission network must be developed to enable our electricity future. Draft Chapter 4: Transmission Adequacy More Documents & Publications...

359

Maintaining body temperature  

NLE Websites -- All DOE Office Websites (Extended Search)

Maintaining body temperature Maintaining body temperature Name: Jeff Location: N/A Country: N/A Date: N/A Question: What keeps the human body at a constant temperature of 98.6? Replies: Maintaining body temperature is very complex. It also takes a lot of energy. About 80% of the energy from the food you eat goes to maintaining body temperature. Basically, the chemical reactions of metabolism of stored food, especially fats, generate heat as a by product. This heat warms the body. The brain reads temperature and controls to some extent the rate of this metabolism. There are also many other mechanisms triggered by the brain to keep the core of your body warm, even if the periphery (skin) is cold. Blood vessels to the fingers and toes constrict, so that the cold air doesn't cool the blood too much, so that cooled blood doesn't cool down the heart and brain when it returns. In severe cases, your body will sacrifice a finger or a toe to keep you from dying of cold core temperature (frostbite: it saves your life!). Also the brain can order a lot of muscles to contract rapidly. This generates a lot of heat quickly, a response called shivering. There's much more to this exciting field of research.

360

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency...

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection...

362

Definition: Firm Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Definition No reegle definition available. Also Known As Firm services Related Terms transmission lines, electricity generation, transmission line, smart grid References ...

363

Survey of Electric and Gas Rights-of-Way Practitioners: Current Practices and Views of Future Transmission Line Siting Issues  

Science Conference Proceedings (OSTI)

The adequacy of the nation's power grid is a topic of great concern, particularly the extent of new construction and upgrades required over the next decade to meet increasing energy demand. This report compiles the survey responses of energy company professionals associated with the task of developing rights-of-way. Respondents provided information on current industry practices, as well as the social and regulatory environment in which they operate to secure rights-of-way for new transmission lines and u...

2003-12-04T23:59:59.000Z

364

Electricity  

Energy.gov (U.S. Department of Energy (DOE))

Electricity is an essential part of modern life. The Energy Department is working to create technology solutions that will reduce our energy use and save Americans money.

365

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

NLE Websites -- All DOE Office Websites (Extended Search)

447: Champlain Hudson Power Express Transmission Line Project, 447: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line will run from the Canadian Province of Quebec to New York City. DOE also published a notice correcting the location of the public hearing that was held on November 19, 2013. Public Comment Opportunities As of December 6, 2013 - Comment Period Extended through 1/15/14 Written comments must be received by January 15, 2014. Comments submitted

366

Evaluating the Potential to Develop New Greenhouse Gas Emission Offsets on Electricity Transmission System Rights-of-Way  

Science Conference Proceedings (OSTI)

This report is a final deliverable for a research project conceived and supported by EPRI. This project explored the potential technical feasibility of developing greenhouse gas (GHG) emissions offsets by implementing enhanced Integrated Vegetation Management (IVM) to enhance management of biomass vegetation growing on high-voltage electricity ...

2013-03-30T23:59:59.000Z

367

Abstract--Transmission expansion in fast growing economies imposes severe challenges to electricity markets, given the need  

E-Print Network (OSTI)

and persistent increases in the per capita energy consumption bring about high electricity load growth rates of uncertainty in load growth and generation expansion, coupled to the arrival of distributed renewable energy, and problems currently faced by different stakeholders. Renewable energy projects have experienced

Catholic University of Chile (Universidad Católica de Chile)

368

Electricity Grid: Impacts of Plug-In Electric Vehicle Charging  

E-Print Network (OSTI)

with electricity generation and distribution is importantincluding generation, transmission, and distribution) can

Yang, Christopher; McCarthy, Ryan

2009-01-01T23:59:59.000Z

369

Hybrid Transmission Corridor Study: Volume 1: Phase 1--Scale Model Development  

Science Conference Proceedings (OSTI)

Installation of HVDC transmission lines on existing rights- of-way with HVAC lines can increase power transfer for a given right-of-way width. This phase of the hybrid transmission corridor study developed a model for predicting the electrical effects between HVAC and HVDC lines in a hybrid corridor. The work underscores the importance of maintaining a critical separation between the two lines.

1992-07-14T23:59:59.000Z

370

The role of transmission investment in the coordination between generation and transmission  

E-Print Network (OSTI)

generation and transmission of electricity into distinct modules. The governance structure of transmission the governance of electricity transmission assets influences the implementation of power flow management. Finally to coordinate generation and transmission of electricity is in real organizations. 1 Assistant Professors

Paris-Sud XI, Université de

371

Transmission Planning Process and Opportunities for Utility-Scale Solar Engagement within the Western Electricity Coordinating Council (WECC)  

DOE Green Energy (OSTI)

This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. Market barriers unrelated to technology often limit the expansion of utility-scale solar power, even in areas with exceptional resource potential. Many of these non-technical barriers have to do with policy, regulation, and planning, and hardly ever do they resolve themselves in a timely fashion. In most cases, pre-emptive intervention by interested stakeholders is the easiest way to remove/address such barriers, but it requires knowing how to navigate the institutional waters of the relevant agencies and boards. This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. It focuses on the Western Interconnection (WI), primarily because the quality of solar resources in the Southwest makes utility-scale concentrating solar power (CSP) and photovoltaics (PV) economically feasible, and because the relevant institutions have evolved in a way that has opened up opportunities for removing non-technical market barriers. Developers will find in this report a high-level field manual to identify the venues for mitigating and possibly eliminating systemic market obstacles and ensuring that the economic playing field is reasonably level. Project-specific issues such as siting for transmission and generation resources are beyond the scope of this report. Instead, the aim is to examine issues that pervasively affect all utility-scale PV and CSP in the region regardless of where the project may be. While the focus is on the WI, many of the institutions described here also have their counterparts in the Eastern and the Texas interconnections. Specifically, this report suggests a number of critical engagement points relating to generation and transmission planning.

Hein, J.; Hurlbut, D.; Milligan, M.; Coles, L.; Green, B.

2011-11-01T23:59:59.000Z

372

Bulk Power Transmission Study  

E-Print Network (OSTI)

"Texans now have a choice. We can become more efficient and maintain our standard of living, or we can continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled, the extensive natural gas pipeline network moved energy easily within the state. In recent years two things have changed: 1. Electric utilities have made extensive investment in lignite, coal, and nuclear plants and, 2. Improvements in gas turbine technology and the removal of institutional barriers has encouraged cogeneration at many of our energy intensive process industries. This energy diversity means that there are now significant differences in energy costs between units. The variable costs of generation of power can vary between units by a ratio of 2 or 3 to 1 and this difference will be accentuated when energy costs rise (and they will; it’s a question of when, not if). The potential for costs savings by optional dispatching of the entire interconnected system are greater than ever before as demonstrated by the PUC's Bulk Power Transmission Study. And the potential can be enhanced with added transmission system investment. Cogeneration and small power production has proven to be the most cost effective way for Texas to add additional generating capacity needed to supply an economy that is starting to rebound and to replace old, obsolete power plants. The freedom to locate these facilities at the fuel source or at the site of large thermal demand makes real economic and environmental sense. The use of renewable or waste fuels allows something that would otherwise be wasted to contribute to our economy. Fossil fuels that are displaced can be redirected to another use or consumed for future benefit. By integrating a gas turbine generator with a. process plant, the natural gas required for producing electricity can be reduced by 40% below that required for a combined cycle. The heat rejected from a gas turbine, combined cycle, or steam plant can be redirected to a process use that contributes to our economy by producing something of value to world markets. By contrast a conventional power plant is paid for by the rate payers and consumes Texas natural resources and therefore is a burden rather than an enhancement to our economy. The optimal location of facilities are possible only if there is an adequate transmission system. Utility, consumer and industry must cooperate to improve our transmission system for the benefit of all Texas. The Texas Public Utilities Commission has taken the lead in promoting efficiency by requiring transmission wheeling between qualifying facilities and electric utilities. Several cogeneration facilities have been constructed as a result. In order to encourage small power production, the rule needs to be expanded to include projects interconnected with distribution systems. Most renewable resource projects are relatively small and cannot afford the cost of a high voltage interconnect, and yet their characteristics match a baseload need. The ability to wheel power to a utility that needs base load power from a distribution level interconnection is essential to development of these smaller projects."

John, T.

1988-09-01T23:59:59.000Z

373

Down hole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

374

Planning electricity transmission to accommodate renewables: Using two-stage programming to evaluate flexibility and the cost of disregarding uncertainty  

E-Print Network (OSTI)

 uncertainty, ECIU), and the value of being able to  postpone  decisions  until  some  uncertainty  is  resolved  (the  expected  cost  of  ignoring  optionality,  ECIO).  These  indices  quantify,  in  different  ways,  the  benefits  of  considering    Thirdly, concern about climate...  the total generation capacity at each bus or  in each zone. This capacity  is often  taken  to  be  a  function  of  uncertain  electricity  demand,  or  simply  presumed  to  have  an  exogenous probability distribution. Other risks that have been considered by some of these  models  are...

van der Weijde, Adriaan Hendrik; Hobbs, Benjamin F.

2011-01-31T23:59:59.000Z

375

NREL: Transmission Grid Integration - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Generation Integration Study Oahu Wind Integration and Transmission SIND Toolkit Electricity Market Design Energy Imbalance Markets Flexible Energy Scheduling Tool for...

376

Electricity Advisory Committee Meeting Presentations October...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 - Interconnection-Wide Transmission Planning Processes Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes...

377

Electricity Advisory Committee Meeting Presentations October...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Processes Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes Panel...

378

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

379

Tennessee Valley Authority (TVA) Transmission Grid Modernization Roadmap  

Science Conference Proceedings (OSTI)

In August 2010, the Tennessee Valley Authority (TVA) adopted a corporate vision for the company to become one of the nation’s leading providers of clean low-cost energy by the year 2020. Within TVA, the Energy Delivery (ED) organization is responsible for the reliable delivery of electric power. ED’s mission is to maintain a cost-effective, reliable, safe, and compliant transmission system for TVA.Various challenges, such as increasing environmental regulation, new and ...

2012-09-11T23:59:59.000Z

380

Directional Reactive Power Ground Plane Transmission  

Directional Reactive Power Ground Plane Transmission Technology Summary ... The invention can transmit electrical power through the surface of the ...

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Electricity Distribution System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Discussion Summary Discussion Summary Electricity Transmission System Workshop 1 Grid Tech Team Discussion Summary Electricity Transmission System Workshop 2 Table of Contents INTRODUCTION ............................................................................................................................................. 3 EXECUTIVE SUMMARY .................................................................................................................................. 4 Process ...................................................................................................................................................... 4 Synthesized Challenges ............................................................................................................................. 5

382

Transmission Rights and Market Power James Bushnell  

E-Print Network (OSTI)

of the transmission grid can advantage some competitors at the expense of others. In electricity markets around control of transmission paths. In electricity markets such as California's, even financial transmissionPWP-062 Transmission Rights and Market Power James Bushnell April, 1999 This paper is part

California at Berkeley. University of

383

Transmission Siting_071508.indd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

384

ELECTRIC  

Office of Legacy Management (LM)

ELECTRIC cdrtrokArJclaeT 3 I+ &i, y I &OF I*- j< t j,fci..- ir )(yiT E-li, ( -,v? Cl -p4.4 RESEARCH LABORATORIES EAST PITTSBURGH, PA. 8ay 22, 1947 Mr. J. Carrel Vrilson...

385

Automated manual transmission clutch controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

1999-11-30T23:59:59.000Z

386

ELECTRIC  

Office of Legacy Management (LM)

ELECTRIC ELECTRIC cdrtrokArJclaeT 3 I+ &i, y$ \I &OF I*- j< t j,fci..- ir )(yiT !E-li, ( \-,v? Cl -p/4.4 RESEARCH LABORATORIES EAST PITTSBURGH, PA. 8ay 22, 1947 Mr. J. Carrel Vrilson General ?!!mager Atomic Qxzgy Commission 1901 Constitution Avenue Kashington, D. C. Dear Sir: In the course of OUT nuclenr research we are planning to study the enc:ri;y threshold anti cross section for fission. For thib program we require a s<>piAroted sample of metallic Uranium 258 of high purity. A quantity of at lezst 5 grams would probably be sufficient for our purpose, and this was included in our 3@icntion for license to the Atonic Energy Coskqission.. This license has been approved, 2nd rre would Llp!Jreciate informztion as to how to ?r*oceed to obtain thit: m2teria.l.

387

EIS-0463: Presidential Permit Application for Northern Pass Transmission,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Presidential Permit Application for Northern Pass 3: Presidential Permit Application for Northern Pass Transmission, New Hampshire EIS-0463: Presidential Permit Application for Northern Pass Transmission, New Hampshire Summary This EIS will evaluate the potential environmental impacts from DOE's proposed Federal action of granting a Presidential permit to Northern Pass Transmission, LLC, to construct, operate, maintain, and connect a new electric transmission line across the U.S.-Canada border in northern New Hampshire. The U.S. Forest Service, White Mountain National Forest, and the U.S. Army Corps of Engineers, New England District, are cooperating agencies in the preparation of this EIS. Public Comment Opportunities None available at this time. Documents Available for Download September 18, 2013 EIS-0463: Notice of Public Meeting Location Change

388

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Estimates of Congestion Costs. The Electricity Journal 17,Incremental Transmission Costs Due to Wind Power. Rockville,and Intermittency Really Cost? Supply Curves for Electricity

Mills, Andrew D.

2009-01-01T23:59:59.000Z

389

Transmission Price Risk Management  

Science Conference Proceedings (OSTI)

This report is concerned with the financial risks that arise from the uncertain price of transmission service in restructured or competitive electricity markets. These risks are most severe in markets with locational pricing (LMP), but they also exist in more traditionally organized electricity markets. This report has two main purposes. The first is to review the existing mathematical models of electricity price formation in spot and forward markets that may be helpful as the foundations for developing ...

2006-12-04T23:59:59.000Z

390

Chapter 4 Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

391

DOE Transmission Capacity Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

392

Assessing Vehicle Electricity Demand Impacts on California Electricity Supply  

E-Print Network (OSTI)

availability, operational limits, ramp rates, and start-up costs Reliability requirements Transmission andavailability, electricity demand, and dispatches power plants based on operating costs and transmission

McCarthy, Ryan W.

2009-01-01T23:59:59.000Z

393

Kentucky Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

EPRI, in conjunction with Georgia Transmission Corporation (GTC) and Photo Science, Inc. (PSI), developed a standardized methodology for siting overhead electric transmission lines. EPRI report 1013080, EPRI-GTC Overhead Electric Transmission Line Siting Methodology, published February 2006, provides additional information. This methodology has been applied in Georgia and currently is being applied to projects in Kentucky by East Kentucky Power Cooperative and E.ON U.S. on behalf of Louisville Gas and El...

2007-12-18T23:59:59.000Z

394

EEI/DOE Transmission Capacity Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

395

Matter & Energy Electricity  

E-Print Network (OSTI)

See Also: Matter & Energy Electricity Energy Technology Computers & Math Distributed Computing Computer Science Science & Society Energy Issues Environmental Policies Reference Electric power transmission Distributed generation Electric power Grid computing ScienceDaily (Oct. 12, 2010) -- A new study

Hines, Paul

396

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Purpose, Need and Issues Purpose, Need and Issues S-1 Summary In this summary: ΠPurpose, Need, and Issues ΠMethods and Their Impacts ΠPlanning Steps ΠProgram Alternatives and Their Impacts Purpose, Need and Issues Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 15,000 miles of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure S-1.) Those states offer a great diversity of vegetation (from trees to brush to grasses), which can interfere with electric power flow, pose safety problems for us and neighboring members of the public, or interfere with our ability to maintain our system. We need to keep vegetation a safe distance away from our electric power facilities and control

397

GRR/Section 8-NV-a - Transmission | Open Energy Information  

Open Energy Info (EERE)

of wastewater, which support or service an electric generating plant. 2. Electric transmission lines and transmission substations that: (a) Are designed to operate at 200...

398

Electricity Transmission and Distribution Technologies ...  

Energy Analysis; Energy Storage; Geothermal; ... For more information about these technologies, ... Marketing Summaries: TAG CLOUD:

399

Electricity Transmission and Distribution Technologies ...  

Integrated Used Nuclear Fuel Storage, ... from burning of fossil fuels has received worldwide attention because of its implication in climate change, ...

400

Electricity Transmission and Distribution Technologies ...  

... residential communities, emergency response, etc. in utilizing renewable energy sources when traditional sources fail or are inadequate. ...

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

402

Steady state modelling and analysis of flexible AC transmission systems.  

E-Print Network (OSTI)

??As electric utilities move into more competitive generation supply regimes, with limited scope to expand transmission facilities, the optimisation of existing transmission corridors for power… (more)

Fuerte Esquivel, Claudio Rubén

1997-01-01T23:59:59.000Z

403

PP-22-4 British Columbia Transmission Corporation  

Energy.gov (U.S. Department of Energy (DOE))

Presidential permit authorizing British Columbia Transmission Corporation to construct, operate, and mantain electric transmission facilities at the U.S-Canadian border.

404

EA-1896: Williston to Stateline Transmission Line Project, Mountrail...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project,...

405

Transmission Reliability | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

406

Electricity Markets  

NLE Websites -- All DOE Office Websites (Extended Search)

Electricity Markets Electricity Markets Researchers in the electricity markets area conduct technical, economic, and policy analysis of energy topics centered on the U.S. electricity sector. Current research seeks to inform public and private decision-making on public-interest issues related to energy efficiency and demand response, renewable energy, electricity resource and transmission planning, electricity reliability and distributed generation resources. Research is conducted in the following areas: Energy efficiency research focused on portfolio planning and market assessment, design and implementation of a portfolio of energy efficiency programs that achieve various policy objectives, utility sector energy efficiency business models, options for administering energy efficiency

407

Transmission Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

408

Electricity and Natural Gas Efficiency Improvements for Residential Gas Furnaces in the U.S.  

E-Print Network (OSTI)

transmission, and distribution of electricity and gas. Wedistribution chain, and the installation cost. Electricity and

Lekov, Alex; Franco, Victor; Meyers, Steve; McMahon, James E.; McNeil, Michael; Lutz, Jim

2006-01-01T23:59:59.000Z

409

On financial transmission rights and market power  

Science Conference Proceedings (OSTI)

This paper studies financial transmission rights in electricity pool markets with nodal pricing, when these rights are to be allocated by an auction mechanism. A market distribution function approach is used to investigate the effects on electricity ... Keywords: Electricity markets, Financial transmission rights, Nodal pricing

Geoffrey Pritchard; Andy Philpott

2005-10-01T23:59:59.000Z

410

Green Transmission Efficiency Initiative  

Science Conference Proceedings (OSTI)

As a consequence of escalating interest in the environment and climate changea national focus on energy efficiency, and growing electricity demandthe time is right to assess energy efficiency from both an end-use perspective as well as across the utility value chain, from generation, to transmission, to distribution. The reduction of our carbon footprint and increasing the role of renewable energy are an important part of the strategy for the greening for electric energy supply. As a result, efficient po...

2009-07-31T23:59:59.000Z

411

Electricity Market Module  

Reports and Publications (EIA)

Documents the Electricity Market Module as it was used for the Annual Energy Outlook 2013. The Electricity Market Module (EMM) is the electricity supply component of the National Energy Modeling System (NEMS). The EMM represents the generation, transmission, and pricing of electricity. It consists of four submodules: the Electricity Capacity Planning (ECP) Submodule, the Electricity Fuel Dispatch (EFD) Submodule, the Electricity Finance and Pricing (EFP) Submodule, and the Electricity Load and Demand (ELD) Submodule.

Jeff Jones

2013-07-24T23:59:59.000Z

412

Transmission Expansion Planning with Re-design  

E-Print Network (OSTI)

Expanding an electrical transmission network requires heavy investments ... Long term transmission expansion planning determines, over an horizon of 10 or more years, ... generation sites are usually far away from the consumption centers.

413

Safety System Obsolescence and Maintainability  

Science Conference Proceedings (OSTI)

The nuclear power industry is currently facing increasing obsolescence issues with original instrumentation and control (I&C) equipment, particularly in safety system applications. These systems, often more than thirty years old, are based on analog technology, relays, and other discrete components, which are becoming difficult to maintain and replace with like equipment. This report helps utilities understand their options and choose the most cost-effective strategies for maintaining and replacing obsol...

2001-05-02T23:59:59.000Z

414

Electric System Update: Sunday August 17, 2003 | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17, 2003 The electric transmission system is now operating reliably. All electric power transmission lines that were removed from service during the blackout on August 14, 2003,...

415

The Market Value and Cost of Solar Photovoltaic Electricity Production  

E-Print Network (OSTI)

during electricity transmission and distribution increasesand distribution infrastructure if less electricity needselectricity, and also ignores the potential savings in transmission and distribution

Borenstein, Severin

2008-01-01T23:59:59.000Z

416

Transmission Bottleneck Project Report. March 19, 2003 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 The U.S. Department of Energy (DOE) National Transmission Grid Study (DOE 2002) determined that congestion in the U.S. electricity transmission system places daily constraints on electricity trade, increasing both electricity costs to consumers and impacts reliable operations. In an effort to support DOE's investigation of transmission bottlenecks, the Consortium for Electric Reliability Technology Solutions (CERTS) surveyed the current state of transmission congestion around the nation. Transmission Bottleneck Project Report. March 19, 2003 More Documents & Publications Electricity Transmission Congestion Costs: A Review of Recent Reports 2012 National Electric Transmission Congestion Study: Preliminary Findings

417

Assessment Methods and Operating Tools for Grid Reliability: An Executive Report on the Transmission Program of EPRI's Power Deliver y Reliability Initiative  

Science Conference Proceedings (OSTI)

Maintaining a high level of power grid reliability is one of the most pressing issues facing the electric power industry today. This report summarizes the achievements and planned activities of the transmission portion of the industry-wide Power Delivery Reliability Initiative, which is developing new tools and methods for assessing and improving grid reliability.

2001-03-26T23:59:59.000Z

418

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

419

Transmission Services J7000  

NLE Websites -- All DOE Office Websites (Extended Search)

C T D E S E R T S O U T H W E S T R E G I O N R O C K Y M O U N T A I N R E G I O N Transmission Services J7000 Ensuring the Reliability of the Bulk Electric System Western's...

420

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

Kotlyar, O.M.

1997-03-25T23:59:59.000Z

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Transmission Enhancement Technology Report  

E-Print Network (OSTI)

to increase transmission capability. Section 3 documents existing technologies used in the industry today the traditional types of design alternatives used by Western and the electric industry. The primary system operate at three times the ampacity of Aluminum Conductor Steel Reinforced (ACSR) conductor and has a much

422

Using 3d geodesign for planning of new electricity networks in spain  

Science Conference Proceedings (OSTI)

Power supply plays a fundamental role in society to boost development in some nations and maintain the standard of living in others. The development of an electricity transmission network involves the planning of a new infrastructure and subsequent construction ... Keywords: ARR (affected assets and rights report), GeoDesign, affections, owners, plots

Francisco-Javier Moreno Marimbaldo; Federico-Vladimir Gutiérrez Corea; Miguel-Ángel Manso Callejo

2012-06-01T23:59:59.000Z

423

STAFF PAPER A Review of Transmission Losses in  

E-Print Network (OSTI)

STAFF PAPER A Review of Transmission Losses in Planning Studies Lana Wong Electricity Analysis Office Electricity Supply Analysis Division California Energy Commission would like to acknowledge the following individuals for providing their insight into transmission

424

PP-228 Edison Sault Electric Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Edison Sault Electric Company PP-228 Edison Sault Electric Company Presidential Permit authorizing Edison Sault Electric Company to construct, operate, and maintain electric...

425

PP-35 Trico Electric Cooperative Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Trico Electric Cooperative Inc PP-35 Trico Electric Cooperative Inc Presidential permit authorizing Trico Electric Cooperative Inc to construct, operate, and maintain electric...

426

Transmission Congestion Study COMMENTS OF CONSOLIDATED EDISION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preparation of the 2012 National Electric Transmission Congestion Study COMMENTS OF CONSOLIDATED EDISION COMPANY OF NEW YORK. INC. AND ORANGE AND ROCKLAND UTILITIES, INC....

427

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2...

428

Directional Reactive Power Ground Plane Transmission - Energy ...  

ORNL researchers have developed a pioneering power ... out-of-phase with respect to time. This phenomenon allows electrical transmission on a single ...

429

NREL: Transmission Grid Integration Home Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Photo of transmission lines with a city in the background. NREL works with electric utilities, energy policymakers, and other industry partners to integrate large-scale renewable...

430

Transmission Expansion Planning with Re-design  

E-Print Network (OSTI)

Aug 3, 2009 ... Abstract: Expanding an electrical transmission network requires heavy investments that need to be carefully planned, often at a regional or ...

431

Transmission Valuation and Cost Recovery  

Science Conference Proceedings (OSTI)

This technical update provides information on the status of the electric power industry regarding the economic valuation of transmission projects. Such valuations became critical with the introduction of economic transmission projects in the context of competitive electricity markets. Economic valuation is also becoming increasingly important for traditional reliability upgrades, because of the need for consistency in cost allocations between the two types of upgrades. The year 2005 has brought significa...

2005-12-22T23:59:59.000Z

432

REQUEST FOR QUALIFICATIONS Siting, Transmission, and Environmental Protection  

E-Print Network (OSTI)

REQUEST FOR QUALIFICATIONS FOR Siting, Transmission, and Environmental Protection Peak Workload RFQ ON ELECTRICITY INFRASTRUCTURE PERMITTING AND OPERATION

433

2012 CERTS R&M Peer Review - Transmission Investment Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Distributed Generation Technology Generation D d Technology Costs Efficiency Measures Demand Response Carbon Tax Electric Vehicles Transmission Planner - Generators respond:...

434

2012 National Electricity Forum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study Workshop - December 15, 2011 Sheraton San Diego Hotel & Marina, 1380 Harbor Island Drive, San Diego, California 92101 Agenda 8:00 am...

435

2012 National Electricity Forum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2011 National Electric Transmission Congestion Study Workshop - December 6, 2011 Hilton Philadelphia Airport, 4509 Island Avenue, Philadelphia, PA 19153 Hilton Philadelphia...

436

2012 National Electricity Forum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 U.S. Department of Energy 2012 National Electric Transmission Congestion Study Western Regional Workshops December 13, 2011 - Portland, Oregon Sheraton Portland Airport Hotel...

437

Biennial Assessment of the Fifth Power Plan Transmission Issues  

E-Print Network (OSTI)

unscheduled electricity flows over transmission lines leading to increased risks to electric system-construction alternatives to transmission; · Inability to effectively monitor the wholesale electricity market, identifyBiennial Assessment of the Fifth Power Plan Transmission Issues INTRODUCTION The Fifth Power Plan

438

Transmission Pricing and Congestion Management: Efficiency, Simplicity and Open Access  

E-Print Network (OSTI)

to the transmission grid is the essential centerpiece for a competitive electricity market. Order 888 and Order 889 for the electric power industry restructuring. These orders provide guidelines for nondiscriminatory transmission functions of the ISO. In an open access, competitive electricity system a transmission pricing scheme should

Oren, Shmuel S.

439

Automated manual transmission mode selection controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI)

1999-11-09T23:59:59.000Z

440

Automated manual transmission shift sequence controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Richard G. (Royal Oak, MI); Rausen, David J. (Denver, CO)

2000-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Regional Transmission Projects: Finding Solutions  

Science Conference Proceedings (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

442

O&M First! Maintaining Effective and Efficient Lighting Can Help...  

NLE Websites -- All DOE Office Websites (Extended Search)

Fact Sheet Maintaining Effective and Efficient Lighting Can Help Save Energy and Reduce Costs Over 20 percent of the nation's electricity is consumed by various lighting products...

443

Mutual Design Considerations for Overhead AC Transmission Lines and Gas Transmission Pipelines, Volume 1: Engineering Analysis  

Science Conference Proceedings (OSTI)

This reference book presents data on an investigation into the mutual effects of electric power transmission lines and natural gas transmission pipelines sharing rights-of-way. Information is useful to both power and pipeline industry users.

1978-09-01T23:59:59.000Z

444

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

at: http://www.ftloutreach.com Xcel Energy, TransmissionCBED CapX Utilities Midwest Xcel Energy Voluntary UtilityElectric Transmission Study Xcel-31A Southwest Power Pool (

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

445

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

446

Assessing Vehicle Electricity Demand Impacts on California Electricity Supply  

E-Print Network (OSTI)

of Plug-in Hybrid Electric Vehicles on Regional PowerTransmission Area, in Electric Vehicle Symposium, Anaheim,of Plug-in Hybrid Electric Vehicles, ANL/ESD/09-2, Argonne

McCarthy, Ryan W.

2009-01-01T23:59:59.000Z

447

Transmission Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

448

ACTION OF X RADIATION ON ADRENERGIC TRANSMISSION  

SciTech Connect

Contractions of the nictitating membrane of anesthetized cats produced by electrical stimulation were recorded during x irradiation of pre- and postganglionic fibers and ganglionic synapse. Brief irradiation with 190-650 r per min, directed toward the center of the membrane, did not modify the response of the smooth muscle to preganglionic stimulation. However, 10-30 min following doses of 10,00040,000 r, an increased response to neural excitation was noted that paralleled the increased sensitivity to infravenous injection of adrenaline or nonadrenaline. Adrenalectomy did not modify these responses, and thus irradiation does not act in this instance by stimulation of the pituitaryadrenal system. The radioresistance of the nictitating membrane and adrenergic transmission is very high; function was maintained even with doses of 1,000,000 r delivered over 8 min or repeated doses of 100,000 over an 8-hr period. (H.H.D.)

Bacq, Z.M.; Beaumariage, M.L.

1962-02-01T23:59:59.000Z

449

Indonesian drilling maintains steady pace  

SciTech Connect

Offshore drilling activity in Indonesia increased nominally the first quarter of 1985 to an average 29 rigs. Barring any further problems with oil prices and markets, operators are expected to maintain essentially the current general level of appraisal/development work for the rest of this year. There are still a number of prospective regions to be explored in Southeast Asia. Regional developments are described for the South China Sea area, the Java Sea, South Sumatra, Kalimantan, Irian Jaya and the Malacca Strait.

Not Available

1985-05-01T23:59:59.000Z

450

Exploration of Resource and Transmission Expansion Decisions  

E-Print Network (OSTI)

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energyin.S. Department of Energy, Office of Electricity Delivery and Energy Reliability, Permitting, Siting and Analysis Division #12;Resource and Transmission ExpansionResource and Transmission Expansion Decisions in WREZ

451

Transportation Center Seminar........ "Proactive Transmission Planning in  

E-Print Network (OSTI)

Transportation Center Seminar........ "Proactive Transmission Planning in Electricity Networks of the biggest problems of actual power-systems transmission planning is its reactive nature. We formulate-systems transmission planning, generation investment, and market operation decisions and propose a methodology to solve

Bustamante, Fabián E.

452

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

Science Conference Proceedings (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

453

Navajo Transmission Project Draft Environmental Impact Statement (DEIS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . SUMRY INTRODUCTION Din6 Power Authority @PA), a Navajo Nation enterprise, proposes to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project ~), is currentiy planned to be in service in the year 2001 and operate for about 50 years. The preparation of an environment impact statement @IS) is required because of Federal government involvement, which includes (1) granting rights-of-way across Federrd and tribal lands and (2) certain participation by Western Area Power Administration ~estem), and agency of the U.S. Department of Energy (DOE). In accordance the National Environmental Policy Act of 1969 ~PA), Council on Environmental Quality (CEQ) regulations

454

Strategic Intelligence & Technology Watch Newsletter for Transmission Losses  

Science Conference Proceedings (OSTI)

Adequate transmission capacity is key to overall grid reliability and proper functioning of electricity markets. However, building new transmission infrastructure is more difficult than ever. Increasing the efficiency of existing transmission systems, and integrating energy efficiency and demand response as part of the overall transmission planning process, could defer the need for new transmission infrastructure and reduce the CO2 footprint of the electricity sector. Utilities are under increasing press...

2008-12-23T23:59:59.000Z

455

Office of Electricity Delivery And Energy Reliability To Hold...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission Office of Electricity Delivery And Energy...

456

Powertrain system for a hybrid electric vehicle - Energy ...  

A hybrid electric powertrain system is provided including an electric motor/generator drivingly engaged with the drive shaft of a transmission. The electric is ...

457

Computational Needs for the Next Generation Electric Grid Proceedings  

E-Print Network (OSTI)

and tools related to the electric power  industry and its 2003.   American Electric Power.  Interstate transmission by  Means  of  Enhanced  Electric  Power  Systems  Control: 

Birman, Kenneth

2012-01-01T23:59:59.000Z

458

Comments by the American Electric Power System on Proposed Coordinatio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments by the American Electric Power System on Proposed Coordination of Federal Authorizations for Electric Transmission Facilities Comments by the American Electric Power...

459

Ancillary-service costs for 12 US electric utilities  

Science Conference Proceedings (OSTI)

Ancillary services are those functions performed by electrical generating, transmission, system-control, and distribution-system equipment and people to support the basic services of generating capacity, energy supply, and power delivery. The Federal Energy Regulatory Commission defined ancillary services as ``those services necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system.`` FERC divided these services into three categories: ``actions taken to effect the transaction (such as scheduling and dispatching services) , services that are necessary to maintain the integrity of the transmission system [and] services needed to correct for the effects associated with undertaking a transaction.`` In March 1995, FERC published a proposed rule to ensure open and comparable access to transmission networks throughout the country. The rule defined six ancillary services and developed pro forma tariffs for these services: scheduling and dispatch, load following, system protection, energy imbalance, loss compensation, and reactive power/voltage control.

Kirby, B.; Hirst, E.

1996-03-01T23:59:59.000Z

460

Transmission Requirements for Off-Shore Wind Integration: A study of the merits of AC and HVDC transmission connection options  

Science Conference Proceedings (OSTI)

This report presents a study of two transmission technologies, AC and HVDC, that could be employed to connect a distant wind farm to the Great Britain (GB) electricity transmission system. A review of the GB electricity transmission system industry codes makes it clear that particular consideration must be given in the design stage to the power factor and voltage control requirements at the interface between the wind farm and the transmission system. The ability of the transmission link and the wind ...

2013-11-20T23:59:59.000Z

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

2001 EPRI International Maintenance Conference: Maintaining Reliable Electric Generation  

Science Conference Proceedings (OSTI)

EPRI's Energy Conversion Division organized and presented a three-day conference on fossil and nuclear generation plant maintenance during August 2001, in Houston, Texas. This CD presents the proceedings of that conference.

2001-07-24T23:59:59.000Z

462

Topic A" Awardee: Western Electricity Coordinating Council |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A" Awardee: Western Electricity Coordinating Council Topic A" Awardee: Western Electricity Coordinating Council Regional Transmission Expansion Planning (RTEP) The America Recovery...

463

Transmission Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

electronically (shift-by-wire) and performed by a hydraulic system or electric motor. In addition, technologies can be employed to make the shifting process smoother than...

464

Transmission Rights-of-Way Vegetation Management Plan Framework  

Science Conference Proceedings (OSTI)

The North American Electric Reliability Corporation (NERC) FAC-003-1 standards for vegetation management on electric transmission line rights-of-way (ROWs) have been in place since April 2006. These mandatory standards regulate electric transmission line vegetation management across the United States, and are narrowly focused on minimizing vegetation caused outages in electricity transmission. The NERC FAC-003-1 standards are potentially broadened by the voluntary American National Standards Institute (A...

2008-08-05T23:59:59.000Z

465

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

466

Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to access each awardee's meeting and events calendar. Eastern Interconnection Topic A Awardee: Eastern Interconnection Planning Collaborative Topic B Awardee: Eastern Interconnection States' Planning Council Western Interconnection Topic A Awardee: Western Electricity Coordinating Council Topic B Awardee: Western Governors' Association Texas Interconnection Topic A and B Awardee: Electric Reliability Council of Texas Electricity Advisory Committee Technology Development Transmission Planning

467

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

468

DOE Transmission System Integration Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

469

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50411.pdf More Documents & Publications Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

470

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS);  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Phase 2 Report: Oahu Wind Integration and Transmission Study Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50414.pdf More Documents & Publications Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

471

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

472

THE PUSH TOWARD GRID REGIONALIZATION IN OPEN ACCESS TRANSMISSION SYSTEMS  

E-Print Network (OSTI)

for the establishment of open access transmission in the US, while the Electricity Directive 96/92 of the European Union robust competition in wholesale electricity markets and mandate transmission-owning utilities to provideTHE PUSH TOWARD GRID REGIONALIZATION IN OPEN ACCESS TRANSMISSION SYSTEMS ProfessorGeorge Gross

Gross, George

473

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

474

Transmission Investment: Nourishing a Gnarly Tree  

Science Conference Proceedings (OSTI)

The Federal Energy Regulatory Commission needs to create a proper framework for investors to weigh the economic viability of transmission projects, then step aside. That means allowing investors and utilities to enter into more varied business models, while maintaining the integrity of the stand-alone transmission business.

Renner, Stein B.

2005-09-01T23:59:59.000Z

475

PP-64 Basin Electric Power Cooperative | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Basin Electric Power Cooperative PP-64 Basin Electric Power Cooperative Presidential Permit Authorizing Basin Electric Power Cooperative to construct, operate, and maintain...

476

PP-43 Maine Electric Power Company, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Maine Electric Power Company, Inc. PP-43 Maine Electric Power Company, Inc. Presidential Permit authorizing Maine Electric Power Company, Inc. to construct, operate, and maintain...

477

PP-33 Rio Grande Electric Cooperative Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rio Grande Electric Cooperative Inc PP-33 Rio Grande Electric Cooperative Inc Presidential permit authorizing Grande Electric Cooperative Inc to construct, operate, and maintain...

478

PP-42 Roseau Electric Cooperative, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Roseau Electric Cooperative, Inc. PP-42 Roseau Electric Cooperative, Inc. Presidential Permit authorizing Roseau Electric Cooperative, Inc to construct, operate, and maintain...

479

PP-55 Roseau Electric Cooperative, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Roseau Electric Cooperative, Inc. PP-55 Roseau Electric Cooperative, Inc. Presidential Permit authorizing Roseau Electric Cooperative, Inc.to construct, operate, and maintain...

480

PP-28 The Northern Electric Cooperative | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Northern Electric Cooperative PP-28 The Northern Electric Cooperative Presidential permit authorizing Sharyland Utilities LP to construct, operate, and maintain electric...

Note: This page contains sample records for the topic "maintain electric transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

PP-69 Vermont Electric Cooperative, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Vermont Electric Cooperative, Inc. PP-69 Vermont Electric Cooperative, Inc. Presidential permit authorizing Vermont Electric Cooperative, Inc. to construct, operate, and maintain...

482

PP-18 Glacier Electric Cooperative, Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Glacier Electric Cooperative, Inc PP-18 Glacier Electric Cooperative, Inc Presidential permit authorizing Glacier Electric Cooperative, Inc to construct, operate, and maintain...

483

Cooperation (Transmission  

E-Print Network (OSTI)

Pricing in Wireless Networks Peter Marbach Department of Computer Science University of Toronto #12; Model/Terminology A B #15; Routes are Fixed #15; C r : Capacity of Node r #15; U r (x r ): Utility Function of Node r 6 #12; Model/Terminology #15; x r : Transmission Rate of Node r #15; y r

Marbach, Peter

484

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

485

RRTT - Rapid Response Team for Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rapid Response Team- Rapid Response Team- Transmission Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West TRIBAL LEADER FORUM SERIES February 7, 2012 Laura Smith Morton Department of Energy Laura.morton@hq.doe.gov Nine Agency MOU * Improves uniformity, consistency, and transparency - Establishes the roles and responsibilities of the nine signatory agencies regarding electric transmission infrastructure project applicants * Provides single point of contact for coordinating all federal authorizations required to locate electric transmission facilities on federal land * Establishes DOE (under authority pursuant to section 216(h) of the FPA) as lead agency for coordinating all federal authorizations and related environmental

486

High current pulse transmission cable  

DOE Patents (OSTI)

This invention is comprised of a transmission cable for carrying high current pulses in which an even numbered plurality of electrical conductors surrounds a central ground conductor. Each electrical conductor is connected so that it at any instant in time it will carry current of opposite polarity to the polarity carried by adjacent conductors. This arrangement cancels practically all of the external fields generated by current in the conductors.

Parsons, W.M.

1990-09-28T23:59:59.000Z

487

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

488

Electricity Advisory Committee Meeting Presentations October 2011 -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Processes Interconnection-Wide Transmission Planning Processes Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes Panel Discussion on Interconnection-Wide Transmission Planning Processes Interconnection-Wide Planning in the Eastern Interconnection - David Whiteley, Eastern Interconnection Planning Collaborative WECC Regional Transmission Expansion Planning (RTEP)10 year plan - Brad Nickell, Western Electricity Coordinating Council Transmission Planning in the ERCOT Interconnection 2011 - Warren Lasher, Electric Reliability Council of Texas EAC Presentation - Interconnection-Wide Planning in the Eastern Interconnection 2011 - Whiteley.pdf EAC Presentation - WECC Regional Transmission Expansion Planning (RTEP)10

489

Investment and Bidding Strategies in Markets for Firm Transmission Rights  

Science Conference Proceedings (OSTI)

The first part of this paper addresses the applicability of the Markowitz portfolio theory to investing in Contracts for Firm Transmission Right (CFTRs) or Transmission Congestion Contracts (TCCs) typical for electricity markets in Northeastern US (PJM, ...

Aleksandr Rudkevich

2004-01-01T23:59:59.000Z

490

Transmission Line Security Monitor: Final Report  

SciTech Connect

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

491

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

492

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

493

Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WORKSHOP WORKSHOP DOUBLETREE CRYSTAL CITY NOVEMBER 1-2, 2012 Anjan Bose, Grid Tech Team U.S. Department of Energy DOE Grid Tech Team (GTT)  The Grid Tech Team (GTT), established by the Office of the Undersecretary of Energy, was tasked with coordinating grid-related activities across the Department and accelerating modernization of the electric power system.  Currently, the GTT comprise of representatives from OE, EERE, ARPA-E, Fossil Energy, Science, Policy and International Affairs, CFO, and the Office of the Secretary of Energy. Vision of the Future Grid A seamless, cost-effective electricity system, from generation to end- use, capable of meeting all clean energy demands and capacity requirements, while allowing consumer participation and electricity

494

Idaho/Transmission/State Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Siting Process The State's direct authority to site high-voltage transmission lines is limited to transmission lines located within National Interstate Electric Transmission Corridors (NIETC); however, no NIETCs currently exist within Idaho so the authority has not been put into practice. Siting authority belongs to local governments or federal agencies that manage the land where the proposed transmission line would be located. Public utilities that

495

Compact, maintainable 80-KeV neutral beam module  

DOE Patents (OSTI)

A compact, maintainable 80-keV arc chamber, extractor module for a neutral beam system immersed in a vacuum of <10.sup.-2 Torr, incorporating a nested 60-keV gradient shield located midway between the high voltage ion source and surrounding grounded frame. The shield reduces breakdown or arcing path length without increasing the voltage gradient, tends to keep electric fields normal to conducting surfaces rather than skewed and reduces the peak electric field around irregularities on the 80-keV electrodes. The arc chamber or ion source is mounted separately from the extractor or ion accelerator to reduce misalignment of the accelerator and to permit separate maintenance to be performed on these systems. The separate mounting of the ion source provides for maintaining same without removing the ion accelerator.

Fink, Joel H. (Livermore, CA); Molvik, Arthur W. (Livermore, CA)

1980-01-01T23:59:59.000Z

496

Computational Needs for the Next Generation Electric Grid Proceedings  

E-Print Network (OSTI)

transmission vision for wind integration.   www.aep.com/Corporation.  Eastern wind integration and transmission a recent study on wind integration (American Electric 

Birman, Kenneth

2012-01-01T23:59:59.000Z

497

Airspace: Antarctic Sound Transmission  

E-Print Network (OSTI)

Antarctic Sound Transmission Andrea Polli Director,investigates how sound transmission can contribute to thePoles. How have such transmission-based projects developed

Polli, Andrea

2009-01-01T23:59:59.000Z

498

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

499

DOE/EA-1503: Finding of No Significant Impact for the Vermont Electric Power Company Proposed Northern Loop Project Environmental Assessment (01/21/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vermont Electric Power Company Vermont Electric Power Company FE Dockets PP-66-2 and PP-82-3 Background Under Executive Order (EO) 10485, as amended by EO 12038, no person may construct, operate, maintain, or connect facilities at the international border of the United States for the transmission of electric energy between the United States and a foreign country without first obtaining a Presidential permit from the Department of Energy (DOE). On June 21, 1979, DOE issued Presidential Permit PP-66 to Citizens Utilities Company (now Citizens Communications Company; "Citizens") for one 120,000-volt (120-kV) electric transmission line that crosses the United States border with Canada near Derby Line, Vermont, and interconnects with similar transmission facilities in Canada owned by Hydro-Quebec.

500

Transmission policy in the United States  

E-Print Network (OSTI)

This paper provides an overview of the development of electric power transmission access, pricing and investment policies in the U.S. over the last 15 years and evaluates the current state of those policies. Pre-liberalization ...

Joskow, Paul L.

2004-01-01T23:59:59.000Z