Powered by Deep Web Technologies
Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

: : Page 1 01 :L RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE: Hull Offshore Wind Research and Development Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number 09EE0000326 DE-EE0000326 GFO-OO00326-001 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution; and

2

Project title:  

Broader source: Energy.gov (indexed) [DOE]

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

3

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

4

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

5

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

6

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

7

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Verification and Accounting of Geologic Carbon Sequestration Using a Field Ready 14 C Isotopic Analyzer DEFE 0001116 Bruno D.V. Marino PhD CEO, Founder Planetary Emissions Management, Inc. 485 Massachusetts Ave. Cambridge, MA 02139 bruno.marino@pem-carbon.com www.pem-carbon.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Benefits of a 14 CO 2 Field Analyzer to DOE MVA Program Goals Program Goals: 99% Containment Identify/Quantify CCS Credits Direct Tracking Verification Tight/Leaky Account for Natural Baseline MVA Atmosphere MVA Groundwater Ecosystem Health, Community Safety

8

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Verification and Verification and Accounting of Geologic Carbon Sequestration Using a Field Ready 14 C Isotopic Analyzer CCS Public Outreach: Pathway to Tradable CCS Securities DEFE 0001116 Bruno D.V. Marino PhD CEO, Founder Planetary Emissions Management, Inc. One Broadway, 14 th Floor Cambridge, MA 02142 bruno.marino@pem-carbon.com www.pem-carbon.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 All RIGHTS RESERVED © Benefits: Public Outreach CCS-MVA LINKED TRADABLE SECURITY Increase Public Confidence in CCS Increase Public involvement in CCS "Leakage Rate" Product Distinct from GHG "Credits"

9

PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Richmond Richmond PROJECT TITLE: EECBG - Solar Compactors and Recycling Units Page 1 of2 STATE: VA Funding Opportunity Announcement Number DE-FOA-0000013 Procurement Instrument Number DE-EE0000878 NEPA Control Number cm Number GFO-0000878-003 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

10

PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Baltimore Baltimore PROJECT TITLE: EECBG - GHG Scrubbing System Page 1 of2 STATE: MD Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-EE0000738 GFO-0000738-002 0 Based all my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: All Technical advice and planning assistance to international, national, state, and local organizations. 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

11

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

12

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

13

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

14

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

15

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

16

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

17

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

18

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

19

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

20

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 DE-FE0001159 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations Gary Mavko Rock Physics Project/Stanford University 2 Presentation Outline * Benefit to the Program * Project Overview * Motivating technical challenge * Approach * Technical Status - Laboratory results - Theoretical modeling * Summary Mavko: Stanford University 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations. - Develop technologies to demonstrate that 99% of injected CO 2 remains in injection zones. * Project benefits statement.

22

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

23

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

24

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

25

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

26

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

27

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

28

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

29

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

30

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

31

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

32

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

33

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

34

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

35

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Web-based CO Web-based CO 2 Subsurface Modeling Geologic Sequestration Training and Research Project Number DE-FE0002069 Christopher Paolini San Diego State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and goals. * Web interface for simulating water-rock interaction. * Development of, and experience teaching, a new Carbon Capture and Sequestration course at San Diego State University. * Some noteworthy results of student research and training in CCS oriented geochemistry. * Status of active student geochemical and geomechancal modeling projects.

36

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

37

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

38

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

39

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

40

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Geological CO Monitoring Geological CO 2 Sequestration using Perfluorocarbon and Stable Isotope Tracers Project Number FEAA-045 Tommy J. Phelps and David R. Cole* Oak Ridge National Laboratory Phone: 865-574-7290 email: phelpstj@ornl.gov (*The Ohio State University) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Developing the Technologies and Building the Infrastructure for CO 2 Storage August 22, 2013 2 Project Overview: Goals and Objectives Goal: Develop methods to interrogate subsurface for improved CO 2 sequestration, field test characterization and MVA, demonstrate CO 2 remains in zone, and tech transfer. Objectives: 1. Assessment of injections in field. PFT gas tracers are analyzed by GC-ECD to

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Acknowledgments Dave Harris, Kentucky Geological Survey Dave Barnes, Western Michigan University John Rupp, Indiana Geological Survey Scott Marsteller, Schlumberger Carbon Services John McBride, Brigham Young University * Project is funded by the U.S. Department of Energy through the National Energy Technology Laboratory (NETL) and by a cost share agreement with the Illinois Department of Commerce and Economic Opportunity, Office of Coal Development through the Illinois Clean Coal Institute * ConocoPhillips: in-kind match * Western Kentucky Carbon Storage Foundation: matching funding * SeisRes 2020, Houston: VSP acquisition and processing

42

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

43

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Results from Simulation Project Results from Simulation Framework for Regional Geologic CO 2 Storage Infrastructure along Arches Province of Midwest United States DOE Award No. DE-FE0001034 Ohio Dept. of Dev. Grant CDO/D-10-03 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting August 21-23, 2012 Joel Sminchak and Neeraj Gupta Battelle Energy Systems sminchak@battelle.org, 614-424-7392 gupta@battelle.org, 614-424-3820 BUSINESS SENSITIVE 2 Presentation Outline 1. Technical Status 2. Background (CO 2 Sources, Geologic Setting) 3. Injection Well history 4. Geocellular Model Development 5. Geological Data (Geological dataset, Geostatistics) 6. Geocellular porosity/permeability model development 7. Pipeline Routing Analysis

44

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SECARB Anthropogenic Test: SECARB Anthropogenic Test: CO 2 Capture/Transportation/Storage Project # DE-FC26-05NT42590 Jerry Hill, Southern Sates Energy Board Richard A. Esposito, Southern Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - CO 2 Capture - CO 2 Transportation - CO 2 Storage * Accomplishments to Date * Organization Chart * Gantt Chart * Bibliography * Summary Benefit to the Program 1. Predict storage capacities within +/- 30% * Conducted high resolution reservoir characterization of the Paluxy saline formation key

45

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

46

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fidelity Computational Analysis of Fidelity Computational Analysis of CO2 Trappings at Pore-scales Project Number: DE-FE0002407 Vinod Kumar (vkumar@utep.edu) & Paul Delgado (pmdelgado2@utep.edu) University of Texas at El Paso U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Collaborators: Dr. C. Harris (Shell Oil Company/Imperial College), Dr. G. Bromhal (NETL), Dr. M. Ferer (WVU/NETL), Dr. D. Crandall (NETL-Ctr), and Dr. D. McIntyre (NETL). 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - Pore-network modeling - Conductance derivation for irregular geom. - Pore-to-CFD Computations

47

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary KANSAS STATE UNIVERSITY Bittersweet Energy Inc. Partners FE0002056 Devilbiss Coring Service Basic Energy Services Wellington Field Operator Industrial and Electrical Power Sources of CO 2 Southwest Kansas CO 2 -EOR Initiative Industry Partners (modeling 4 Chester/Morrowan oil fields to make CO2 ready) +drilling and seismic contractors TBN

48

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 Brighton 1&2 2:40 August 20, 2013 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary ORGANIZATIONAL STRUCTURE Modeling CO 2 Sequestration in Saline A quifer and Depleted Oil Reservoir to Evaluate Regional CO 2 Sequestration Potential of Ozark Plateau A quifer System, South-Central Kansas Co-Principal Investigators Co-Principal Investigators Kerry D. Newell -- stratigraphy, geochemistry

49

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tracer for Tracking Permanent CO 2 Storage in Basaltic Rocks DE-FE0004847 Jennifer Hall Columbia University in the City of New York U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Conservative and Reactive Tracer Techniques * Accomplishments to Date * Summary 3 Benefit to the Program * The goal of the project is to develop and test novel geochemical tracer techniques for quantitative monitoring, verification and accounting of stored CO 2 . These techniques contribute to the Carbon Storage Program's

50

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

51

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Scale CO Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources International U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Program Goals * Benefits Statement * Project Overview - Goals - Objectives * Technical Status * Accomplishments to Date * Summary * Appendix USDOE/NETL Program Goals * Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop and validate technologies to ensure 99 percent storage permanence. * Develop technologies to improve reservoir storage

52

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUMNER COUNTY, KANSAS DE-FE0006821 W. Lynn Watney, Jason Rush, Joint PIs Kansas Geological Survey The University of Kansas Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Brighton 1&2 Wednesday 8-21-13 1:10-1:35 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 2 Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Project Team DOE-NETL Contract #FE0006821 KANSAS STATE UNIVERSITY 3 L. Watney (Joint PI), J. Rush (Joint PI), J. Doveton, E. Holubnyak, M. Fazelalavi, R. Miller, D. Newell, J. Raney

53

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Seal Repair Using Seal Repair Using Nanocomposite Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Ed Matteo, Thomas Dewers Sandia National Laboratories 2 Presentation Outline * Introduction and overview * Materials synthesis * Materials testing and characterization * Annular seal system testing * Numerical simulation * Summary 3 Benefit to the Program * BENEFITS STATEMENT: The project involves the development and testing of polymer-cement nanocomposites for repairing flaws in annular wellbore seals. These materials will have superior characteristics compared to conventional

54

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity Project Number DE-FE0002112 PIs Drs. John Kaszuba and Kenneth Sims Virginia Marcon University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status - Results - Conclusions - Next Steps * Summary 3 Benefit to the Program * Program goal being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. - Monitoring, Verification, and Accounting (MVA). MVA technologies seek to monitor, verify, and

55

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Impact of CO Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number (DEFE0002421) Dr. Yiran Dong Drs. Bruce W. Fouke, Robert A. Sanford, Stephen Marshak University of Illinois-Urbana Champaign U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Technical status * Results and discussion * Summary * Appendix 3 Benefit to the Program This research project has developed scientific, technical and institutional collaborations for the development of

56

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mohammad Piri and Felipe Pereira Mohammad Piri and Felipe Pereira University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 2013 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status o Experimentation: core-flooding and IFT/CA o Pore-scale modeling modeling * Accomplishments to Date * Summary University of Wyoming 3 Benefit to the Program * Program goal: o 'Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.' * Benefits statement: o The research project is focused on performing reservoir conditions experiments to measure steady-state relative permeabilities,

57

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MVA Tools MVA Tools Sam Clegg, Kristy Nowak-Lovato, Ron Martinez, Julianna Fessenden, Thom Rahn, & Lianjie Huang Los Alamos National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview - Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix - Organization Chart - Bibliography 3 Project Overview: Goals and Objectives * Surface MVA - Frequency Modulated Spectroscopy - Quantitatively identify CO2, H2S and CH4 seepage from geologic sequestration sites - Distinguish anthropogenic CO2 from natural CO2 emissions * CO2 carbon stable isotope measurements

58

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 BROWN 2 Presentation Outline * Benefits & overview of deriving acrylates from coupling carbon dioxide and ethylene * Chemical catalysis approach: background and battles left to fight * Experimental assessment of the viability of thermochemical acrylate production * Perspectives for the future BROWN 3 Benefit to the Program * This project identifies the critical catalyst features necessary to promote carbon dioxide coupling with ethylene to acrylate at molybdenum catalysts. This research demonstrates the viability of acrylate production

59

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool to Improve CO2 Sequestration DE FE0004542 Larry Murdoch, Clemson University Stephen Moysey, Clemson University Leonid Germanovich, Georgia Tech Cem Ozan, Baker Hughes Sihyun Kim, Georgia Tech Glenn Skawski, Clemson University Alex Hanna, Clemson University Johnathan Ebenhack, Clemson University Josh Smith, Clemson University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool, Larry Murdoch Project Review Meeting, 23 Aug. 2013 2 Presentation Outline * Preliminaries

60

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DE-FE0001836: DE-FE0001836: Numerical modeling of geomechanical processes related to CO 2 injection within generic reservoirs Andreas Eckert & Runar Nygaard Missouri University of Science & Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Objectives, Benefits and Outcomes * Technical status: Project summary - Teaching - Reservoir scale (Geomechanics & Fluid flow simulation) - Borehole scale (Wellbore integrity & wellbore trajectory planning) * Conclusions * Appendix 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DE-FE0002225: DE-FE0002225: Actualistic and geochemical modeling of reservoir rock, CO 2 and formation fluid interaction, Citronelle oil field, Alabama West Virginia University & University of Alabama Presenter: Dr. Amy Weislogel (WVU) Co-PI: Dr. Rona Donahoe (UA) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Overview & Project Map * Reservoir Geochemical Characterization * Formation Fluid Geochemistry * Geochemical Modeling * Summary 3 Benefit to the Program * Develop technologies that will support industries'

62

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigating the Fundamental Investigating the Fundamental Scientific Issues Affecting the Long-term Geologic Storage of Carbon Dioxide Project Number DE-FE0000397 Lee H Spangler Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Computational tool development * Laboratory studies to understand subsurface CO 2 behavior * Analog studies to inform risk analysis * Near surface detection technologies / testing * Mitigation method development 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

63

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FE/NETL CTS Cost Models and FE/NETL CTS Cost Models and Benefits Assessment of Carbon Storage R&D Program David Morgan Benefits Division Office of Program Planning and Analysis National Energy Technology Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 OFFICE OF FOSSIL ENERGY 2 Presentation Outline * Overview of benefits assessment * Overview of FE/NETL models used to assess benefits of CO 2 capture and storage * Benefits evaluation of Storage Program's R&D projects using a model to estimate costs of CO 2 storage in a saline aquifer * Description of model used to estimate costs of

64

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline * Benefit to the program * Project overview: Why 14 C for MVA? * Technical status: Cartridges, injections, lasers * Summary * Organizational chart * Collaborators 3 Benefit to the Program * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Permanent storage of CO 2 can be demonstrated by adding carbon-14 ( 14 C) prior to injection. This research project aims to demonstrate this by tagging fossil CO 2 with 14 C at a field site. When completed, this system will show that 14 C can be a safe and effective tracer for sequestered CO 2 . A laser-based 14 C measurement method is being adapted for continuous monitoring. This technology contributes to the Carbon Storage Program's effort of ensuring 99 percent

65

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Leakage Pathways and Leakage Pathways and Mineralization within Caprocks for Geologic Storage of CO 2 Project DE-FC26-0xNT4 FE0001786 James P. Evans Utah State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Goals and Objectives * Relationship to overall program goals * Overview of seal bypass * Technical status; bypass systems - Field based studies - Technological advances * Accomplishments and Summary * Appendices 3 Benefit to the Program * Program goals addressed * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

66

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Michael G. Waddell Earth Sciences and Resources Institute University of South Carolina U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 2 Presentation Outline * Project goals and benefits * Overview of the geology of the South Georgia Rift basin in SC * Results of petrographic and core analysis from the Rizer #1 * Future investigations in the SGR * Summary 3 Benefit to the Program Program Goals: * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected

67

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Micro-Structured Sapphire Fiber Sensors for Micro-Structured Sapphire Fiber Sensors for Simultaneous Measurements of High-T and Dynamic Gas Pressure in Harsh Environments DE-FE0001127 Investigators: Hai Xiao, Hai-Lung Tsai, Missouri University of Science and Technology Junhang Dong, University of Cincinnati Program Manager: Norm Popkie, Gasification Division, NETL DOE Project Kickoff Meeting in the NETL Pittsburgh December 15, 2009 Outline * Background * Objectives * Project Elements * Management Plan * Research Plan and Approaches * Risk Management * Summary Background * Demands: High-performance, reliable, in situ sensors are highly demanded for advanced process control and lifecycle management in existing and future advanced power and fuel systems - Improved efficiency/safety/reliability/availability/maintainability

68

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mart Oostrom Mart Oostrom Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline  Project overview  Sub-Task 1: Investigation of CO 2 migration in heterogeneous porous media  Sub-Task 2: Modeling CCUS deployment in China  Summary Collaboration with China on Clean Energy Research 3 Benefit to the Program The Clean Energy Partnership was established by a memorandum of understanding between the Chinese Academy of Sciences, the National Energy Technology Laboratory and the Pacific Northwest National Laboratory in May of 2009 with the goal of significantly reducing the environmental emissions and improving the efficiency of

69

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Evaluation of Evaluation of Geophysical Methods for Monitoring and Tracking CO 2 Migration in the Subsurface PI: Jeffrey Daniels Co-PI: Robert Burns & Franklin Schwartz Students: Michael Murphy & Kyle Shalek The Ohio State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 FOA Number: DE-FOA-0000032 NETL Award Number: DE-FE0002441 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 3 Benefit to the Program * Program Goal: Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones

70

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

capillary trapping (FE0004956), Bryant, UT-Austin capillary trapping (FE0004956), Bryant, UT-Austin Influence of Local Capillary Trapping on Containment System Effectiveness DE-FE0004956 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin

71

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and objectives * Carbon gasification * Carbon reactivity studies * Catalyst development * Techno-economic analysis * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

72

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improved Caprock Integrity and Improved Caprock Integrity and Risk Assessment Techniques Project Number (FE0009168) Michael Bruno, PhD, PE GeoMechanics Technologies U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Introduction and Motivation 2 A primary requirement for long-term geologic storage and containment of carbon dioxide is ensuring caprock integrity. Large-scale CO2 injection requires improved and advanced simulation tools and risk assessment techniques to better predict and help control system failures, and to enhance performance of geologic storage. GeoMechanics Technologies is developing enhanced simulation and risk analysis approaches to assess and

73

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive Monitoring and Uncertainty Assessment of CO 2 Plume Migration DOE-FE0004962 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin

74

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Basin-Scale Leakage Risks from Basin-Scale Leakage Risks from Geologic Carbon Sequestration: Impact on CCS Energy Market Competitiveness Catherine A. Peters Jeffery P. Fitts Michael A. Celia Princeton University Paul D. Kalb Vatsal Bhatt Brookhaven National Laboratory Elizabeth J. Wilson Jeffrey M. Bielicki Melisa Pollak University of Minnesota DOE Award DE-FE0000749 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to CCUS research program * Project Goals & Objectives * Technical Status  Thrust I - Reservoir-scale simulations of leakage potential with permeability evolution

75

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Modeling CO for Modeling CO 2 Processes: Pressure Management, Basin-Scale Models, Model Comparison, and Stochastic Inversion ESD09-056 Jens T. Birkholzer with Abdullah Cihan, Marco Bianchi, Quanlin Zhou, Xiaoyi Liu, Sumit Mukhopadhyay, Dorothee Rebscher, Barbara Fialeix Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview and Technical Status - Task 1: Optimization of Brine Extraction for Pressure Management and Mitigation - Task 2: Basin-scale Simulation of CO 2 Storage in the Northern Plains - Prairie Basal Aquifer - Task 3: Sim-SEQ Model Comparison

76

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beneficial Use of CO Beneficial Use of CO 2 in Precast Concrete Production DE-FE0004285 Yixin Shao, Yaodong Jia Liang Hu McGill University 3H Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation outline * Goals and objectives * Benefits to the program * Project overview * Technical status * Accomplishment to date * Summary 2 Objective Masonry blocks Fiber-cement panels Prefabricated buildings Concrete pipes To develop a carbonation process to replace steam curing in precast concrete production for energy reduction, and carbon storage and utilization. Goals * CO 2 sequestration capacity by cement:

77

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

University of Kansas Center for Research University of Kansas Center for Research Kansas Geological Survey U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 Presentation Outline * Benefits, objectives, overview * Methods * Background & setting * Technical status * Accomplishments * Summary Benefit to the Program * Program goal addressed: Develop technologies that will support the industries' ability to predict CO 2 storage capacity in geologic formations to within ± 30 percent. * Program goal addressed: This project will confirm - via a horizontal test boring - whether fracture attributes derived from 3-D seismic PSDM Volumetric Curvature (VC) processing are real. If

78

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project benefits and objectives * Carbon reactivity studies * Catalyst mechanism studies * Catalyst development * Test results * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

79

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-22, 2013 0-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Advanced simulation tool for quantifying transport in porous and fractured geological formations during CO 2 sequestration that includes all mechanisms: convection, diffusion, dissolution and chemical reactions * A simulator that can fully model these processes does not currently exist * Simulator will contribute to our ability to predict CO 2 storage capacity in geologic formations, to within ±30 percent 4 Project Overview: Goals and Objectives Comprehensive reservoir simulator for investigation of CO 2 non-isothermal, multiphase flow and long-term storage in

80

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Thomas J. Wolery Thomas J. Wolery Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 LLNL-PRES-574632 2 Team Members * Roger Aines * Bill Bourcier * Tom Wolery * Tom Buscheck * Tom Wolfe (consultant) * Mike DiFilippo (consultant) * Larry Lien (Membrane Development Specialists) 3 Presentation Outline * Overview of Active CO 2 Reservoir Management (ACRM) * Subsurface Reservoir Management: Made Possible by Brine Production, Yielding Many Benefits * Brine Disposal Options - What brines are out there? - What are the treatment options? 4 Benefit to the Program * This project is identifying and evaluating

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

William Bourcier William Bourcier Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Saline Aquifer Brine Production Well Brine Injection Well Chiller Pretreatment Desalination Brine Permeate To power plant or other use Storage pump CO 2 injection Concept is to extract and desalinate aquifer brines to create fresh water and space for CO 2 storage cap-rock 3 Presentation Outline * Overview, Purpose, Goals and Benefits * Technical status - Brine treatment and disposition - Reservoir management * Accomplishments * Summary and Planned work Goals and Objectives Technical Goals Potential advantages of brine

82

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Metrics for Screening CO Metrics for Screening CO 2 Utilization Processes Peter Kabatek Energy Sector Planning and Analysis (ESPA) Services / WorleyParsons U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * NETL's Carbon Storage Program * Introduction of the metrics * Review of the case study technology * Application of metrics to the case study technology * Discussion of metrics interpretation and grouping 3 NETL Carbon Storage Program * The Carbon Storage Program contains three key elements: - Infrastructure - Global Collaborations - Core Research and Development: * Monitoring, Verification and Accounting (MVA) * Geologic Storage

83

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Reservoir Simulation Model * Intelligent Leakage Detection System (ILDS) * Accomplishments * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. CO2 Leakage(X,Y,Q) Artificial Intelligence & Data Mining Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 : * Conference call * Site selection criteria - November 17 th 2009: * A meeting during the Regional Carbon Sequestration Partnership Meeting in Pittsburgh

84

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Factors Influencing Factors Influencing CO 2 Storage Capacity and Injectivity in Eastern Gas Shales Contract No. DE-FE0004633 Michael Godec, Vice President Advanced Resources International mgodec@adv-res.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Benefits * Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefits to the Program * Program Goals Addressed - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

85

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Training and Research Peter M. Walsh University of Alabama at Birmingham U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS Pittsburgh, Pennsylvania August 21-23, 2012 DE-FE0002224 * Evaluation of the sealing capacity of caprocks serving as barriers to upward migration of CO 2 sequestered in geologic formations. * Education and training of undergraduate and graduate students, through independent research on geologic sequestration. * Education, through an advanced undergraduate/graduate level course on coal combustion and gasification, climate change, and carbon sequestration. * Simulation of CO 2 migration and trapping in storage

86

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction - Objective - Industrial Review Committee - Background * Steps Involved - Geological and Reservoir Simulation Modeling - Leakage Modeling & Real-Time Data Processing - Pattern Recognition & Intelligent Leakage Detection System (ILDS) * Accomplishments to Date * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 :

87

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies assume a discrete reservoir/caprock interface with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 4 Reservoir Caprock Reservoir Introduction The nature of reservoir/caprock interfaces 4 Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person (Cooperating Scientist) NMT Modeling Stefan Raduha NMT Sedimentology

88

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ketzin Collaboration Ketzin Collaboration ESD-09-056 Barry Freifeld Earth Sciences Division Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and objectives * Success Criteria * Technical Status * Latest developments in Integrated Monitoring * Summary and Lessons Learned 3 Image from: www.co2ketzin.de 4 Benefit to the Program * Program goal being addressed: - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * The Ketzin collaboration leverages information gained through the mid-scale geological sequestration experiment in Ketzin, Germany.

89

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jennifer A. Kozak, Jennifer A. Kozak, 1,2 Dr. Fritz Simeon, 2 Prof. T. Alan Hatton,* ,2 and Prof. Timothy F. Jamison* ,1 1 Department of Chemistry and 2 Department of Chemical Engineering Massachusetts Institute of Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation, Goals, Objectives * Background * Cyclic Carbonate Synthesis via Catalytic Coupling of CO 2 and Epoxides * New Catalysts and Reaction Scope * Mechanism - A New Paradigm for Activating Epoxides * Conclusions 3 Benefit to the Program * Identify the Program goals being addressed. - Develop technologies to demonstrate that 99 percent

90

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies involve a caprock/reservoir interface, and assume a discrete contact with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 Introduction The nature of reservoir/caprock interfaces 4 Triassic-Jurassic Strata, San Rafael Swell, UT Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person

91

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Geologic Geologic Characterization of the Triassic Newark Basin of Southeastern New York and Northern New Jersey (DE-FE0002352) Daniel J. Collins, PG, RG Sandia Technologies, LLC U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 * Acknowledgment: This material is based upon work supported by the Department of Energy [National Energy Technology Laboratory] under Award Number DE- FE0002352, Contract No. 18131 from the New York State Energy Research & Development Authority [NYSERDA], and "In Kind" Cost Share from Schlumberger Carbon Services, Weatherford Laboratories, National Oilwell Varco, New York State Museum, and Rutgers University.

92

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RISK ASSESSMENT AND MONITORING OF RISK ASSESSMENT AND MONITORING OF STORED CO 2 IN ORGANIC ROCKS UNDER NON- EQUILIBRIUM CONDITIONS DOE (NETL) Award Number: DE-FE0002423 Investigator: Vivak (Vik) Malhotra DOE supported undergraduate student participants: Jacob Huffstutler, Ryan Belscamper, Stephen Hofer, Kyle Flannery,, Bradley Wilson, Jamie Pfister, Jeffrey Pieper, Joshua T. Thompson, Collier Scalzitti-Sanders, and Shaun Wolfe Southern Illinois University-Carbondale Carbondale, Illinois 62901-4401 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Carbon Storage Program * Program goals being addressed: - To attempt to answer whether CO

93

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Water-Rock Interactions Water-Rock Interactions and the Integrity of Hydrodynamic Seals FWP FE-10-001 Bill Carey Los Alamos National Laboratory Los Alamos, NM U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program Goal: Ensure retention of 99% of injected CO 2 * Focus: Wellbore integrity * Approach: Use field, experimental and computational methods - Determine long-term compatibility of wellbore materials with CO 2 - Determine leakage mechanisms - Predict well performance * Benefit: The research will provide a basis for evaluating the long-term performance of wells, guide remediation

94

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

© 2012 Paulsson, Inc. (PI) Development of a 1,000 Level 3C Fiber Optic Borehole Seismic Receiver Array Applied to Carbon Sequestration DE-FE0004522 Björn N.P. Paulsson Paulsson, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 ® © 2012 Paulsson, Inc. (PI) © 2012 Paulsson, Inc. (PI) * Goals: Design, build, and test a high performance borehole seismic receiver system to allow cost effective geologic Carbon Capture and Storage (CCS) * Objectives: A: Develop technology to allow deployment of a 1,000 level drill pipe deployed 3C Fiber Optic Geophone (FOG) receiver array for deep

95

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Space Geodesy and Geochemistry Space Geodesy and Geochemistry Applied to Monitoring and Verification of Carbon Capture and Storage Award # DE-FE0002184 Peter Swart University of Miami Tim Dixon University of South Florida U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * What is the Award For? * What Research Work is being Supported? * Geochemical Research What is the Award For? * Provides Support for the Training of Two Graduate Students - Student 1: Involved in analysis of SAR images - Student 2: Involved in modeling of sub-surface geochemistry and application of models for policy decisions

96

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

fluid-driven fracture fluid-driven fracture DE-FE0002020 Joseph F. Labuz Civil Engineering University of Minnesota U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits statement * Goal, objectives * Technical status: fracture code, experimental results (poro, AE) * Accomplishments * Summary 0 50 100 150 200 250 300 350 0.00 0.05 0.10 0.15 0.20 Lateral displacement [mm] Load [kN] 0 300 600 900 1200 1500 AE events inelastic deformation peak 3 Benefit to the Program * Goal: develop technologies to predict CO2 storage capacity in geologic formations. * Benefits statement: develop 3D boundary element code & experimental techniques

97

Project Title Project Sponsor (funding agency)  

E-Print Network [OSTI]

and procedures applicable to the above project; and we confirm that the PI is eligible to apply in accordance Project Title Project Sponsor (funding agency) Declaration of Principal Investigator (PI) I certify that: I agree that my participation in the project must be in accordance with all

Saskatchewan, University of

98

Town of Danvers, MA Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead Town of Danvers, MA Country United States Headquarters Location Danvers, Massachusetts Recovery Act Funding $8,476,800.00 Total Project Value $16,953,600.00 Coverage Area Coverage Map: Town of Danvers, MA Smart Grid Project Coordinates 42.5750946°, -70.9300507° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

99

Title Project Number  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Coupled HCTM Phenomena Coupled HCTM Phenomena From Pore-scale Processes to Macroscale Implications DE-FE0001826 J. Carlos Santamarina Georgia Institute of Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline Project Overview: The Proposal Accomplishments: HTCM Coupled Processes Appendices: Contact Information Schedule Bibliography Presentation Outline Project Overview: The Proposal Accomplishments: HTCM Coupled Processes Appendices: Contact Information Schedule Bibliography Relevance "Faustian bargain"? long-term CO 2 geo-storage needed (C-economy + climate change)

100

Title Project Number  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project DE-FE0001808 Novel Oxygen Carriers For Coal-Fueled Chemical Looping Combustion Western Kentucky University Presenter: Dr. Yan Cao Institute for Combustion Science and Environmental Technology February 25, 2011 Project Participants * PIs: Dr. Wei-Ping Pan Dr. Yan Cao * Students: Ms. Wen Ying (Master student) Mr. Andy Wang (Undergraduate student) Mr. Yanwen Cui (Master student) Introduction (limit - 1 slide) * Background on the project * Anticipated benefits Solid Oxygen Carriers 1. Commercially accepted kinetics - coupling and potential uncoupling (free oxygen) 2. Thermal Stability, Lower degradation, and Lower Attrition loss 3. Favored thermodynamics for pure CO 2 4. Opportunity to release of free oxygen for improvement of process kinetics;

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Header with Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5NT42646 Zero Emissions Coal Syngas-Oxygen Turbo Machinery 5NT42646 Zero Emissions Coal Syngas-Oxygen Turbo Machinery FACT SHEET (42646) Oct. 2006 I. PROJECT PARTICIPANTS A. Siemens Power Generation, Inc. B. Florida Turbine Technologies, Inc. C. Clean Energy Systems, Inc. II. PROJECT DESCRIPTION A. Objective(s) - To develop a cost effective and highly efficient turbo machinery system that will work with an oxy-fuel combustor that generates very high temperature CO2 and steam mixture as the working fluid. After expansion of the working fluid, the CO2 is captured allowing near-zero emissions of NOx and carbon. The project will complete conceptual designs of alternate steam cycles and select one cycle for detailed design based on cost and feasibility studies. B. Relevancy - 1. Background: CES, Inc. has an operational oxy-fuel combustor that generates

102

Header with Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission 42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission Hydrogen/Syngas Combustion 12/15/2006 FACT SHEET I. PROJECT PARTICIPANTS Parker Hannifin Corporation (Lead) Gas Turbine Fuel Systems Division, 9200 Tyler Blvd., Mentor OH 44060 PI: Dr. Adel Mansour (e-mail: amansour@parker.com, Ph.: 440-954-8171) University of California at Irvine UCI Combustion Laboratory, Irvine, CA 92617 Solar Turbines Incorporated 2200 Pacific Highway, San Diego CA 92101 II. PROJECT DESCRIPTION A. Objective(s) The overall objective of this DOE-Supported research and development program is to develop and test a next-generation, practical and scalable, high-performing, multi-point injector module for hydrogen and syngas fuels. The injector will use Parker Hannifin's

103

Header with Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Shock Wave Compression rev060908, 6/14/06, rev 9/8/06 Shock Wave Compression rev060908, 6/14/06, rev 9/8/06 FACT SHEET Rampressor Shock Wave Compressor , DE-FC26-06NT42651 (Ramgen Power Systems, RPS) I. PROJECT PARTICIPANTS A. Prime Participant: Ramgen Power Systems, Inc (RPS) under cooperative Agreement DE-FC26-06NT42651 B. Sub-Award Participants: ASE Technologies (ASE), Manufacturing Resources Inc. (MRI), Geminus Technologies Development (GTD), Steve Kushnick, P.E., Alouette Technology. II. PROJECT DESCRIPTION A. Objective(s): Based on aerospace ramjet technology, Ramgen Power Systems is developing a novel more cost effective compressor concepts (air and carbon dioxide) for support of coal fueled gasification stationary power applications and for potential replacement of the compressor component in gas turbines.

104

Title Project Number  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Research 2011 Yearly Review Meeting Project DE-FE0002128 Analysis of microbial activity under a supercritical CO 2 atmosphere Massachusetts Institute of Technology Prof. Janelle Thompson, Department of Civil and Environmental Engineering February 24-26, 2011 Project Participants * Dr. Janelle Thompson, PhD, Assistant Professor, Civil and Environmental Engineering (MIT) * Dr. Hector Hernandez, PhD, Martin Luther King Postdoctoral Fellow (MIT) * Mr. Kyle Peet, doctoral student, Civil and Environmental Engineering, MIT * 2 undergraduates Janelle Hector Kyle 3 Why do microbes matter? CO 2 "trapping" mechanisms -biofilm barriers -mineralization Natural and Engineered Systems Mitchell et al, 2009 dawsonite Biofilm Barriers Biological catalysis of mineral trapping Can we recover life forms that grow in supercritical CO

105

Project Title: VIscosity Reduction Date:  

Broader source: Energy.gov (indexed) [DOE]

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

106

Sustainability Project Fund Application Form Requirements Project Title  

E-Print Network [OSTI]

Sustainability Project Fund Application Form Requirements Project Title: Budget Requested: Applicant/Project Leader: Faculty/Department: Email: Daytime Phone: Project Team: (Please include. Project Overview Project summary: · Provide a brief background, describing the project, objectives

Volesky, Bohumil

107

EDeMa (Smart Grid Project) (Krefeld, Germany) | Open Energy Information  

Open Energy Info (EERE)

EDeMa (Smart Grid Project) (Krefeld, Germany) EDeMa (Smart Grid Project) (Krefeld, Germany) Jump to: navigation, search Project Name EDeMa Country Germany Headquarters Location Krefeld, Germany Coordinates 50.652943°, 6.339111° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.652943,"lon":6.339111,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

108

Project Information Form Project Title Modeling for Local Impact Analysis  

E-Print Network [OSTI]

Project Information Form Project Title Modeling for Local Impact Analysis University University Research and Educational Foundation- $48,683.00 Total Project Cost $48,683.00 Agency ID or Contract Number Project We will develop a traffic simulation model for the Los Angeles region that will allow us

California at Davis, University of

109

Proposed Start Date: Title of Project  

E-Print Network [OSTI]

Proposed Start Date: Title of Project: 1 Department:Principal Investigator(s): 1. College: Phone/ Email: 5 6 7 8 Does project involve: Human subjects? No Yes VertebrateAnimals? No Yes Radioactive understand and agree to comply with the URI policies and procedures for misconduct, conflict of interest

Rhode Island, University of

110

Critical in PROJECT TITLE COMMENTS BPA NPCC  

E-Print Network [OSTI]

PROJECT NUMBER (BiOp Critical in Italics) PROJECT TITLE COMMENTS BPA NPCC 35019 Develop and Implement a Pilot Status and Trend Monitoring Program BPA reduced budget by $250,000 to reflect duplicate NPCC tier 2. NPCC budget reflects an assumption of a capital determination for some components; BPA has

111

Project Title: Thematic Analysis of Forensic  

E-Print Network [OSTI]

Project Title: Thematic Analysis of Forensic Service Whanau/family Booklet Bachelor of Arts Application Deadline: 13 February, Noon Project Description: The Canterbury Regional Forensic Service (http' and their families' journey through the Forensic Service. The data has already been transcribed but needs in

Hickman, Mark

112

Project Title: Thematic Analysis of Forensic  

E-Print Network [OSTI]

Project Title: Thematic Analysis of Forensic Service Whanau/family Booklet Bachelor of Arts Application Deadline: 1 February, 2012 Project Description: The Canterbury Regional Forensic Service (http' and their families' journey through the Forensic Service. The data has already been transcribed but needs in

Hickman, Mark

113

Project Information Form Project Title Eco-Driving for Transit  

E-Print Network [OSTI]

Provided (by each agency or organization) DOT - $54,871.35 Total Project Cost $54,871.35 Agency IDProject Information Form Project Title Eco-Driving for Transit University Georgia Institute Project Second-by-second data for school buses, MARTA transit buses, and GRTA express buses

California at Davis, University of

114

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

New power Line for new generator at ten sleep New power Line for new generator at ten sleep Dat e: 12114/10 DOE Code: Contractor Code: Project Lead: Mike Preston Project Overview 1. Brief project description (include Extend 3 phase power line from (existing) pole 99 to the Ten Sleep location for a new generator. The anything that could impact the transformer bank at the WDF will be dismantled, the line extended overhead, across 5 new power poles, to environment) the Ten Sleep Battery and the bank will be reassembled there. The new guy anchor at pole 99 will be located outside Palustrine wetlands. The line will be 34.5/19.920 KV, approximately 1,200 feet in length. 2. Legal location Ground disturbance will be minimal and have very little potential to affect the environment. 3. Duration of the project

115

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Date: 12120/2010 DOE Coda: Contractor Coda: Project Lead: Marcus Bruckner Project Overview 1 Dig ditch from 24-51-8TX-1 0 to 24-AX-10 and remove and replace electrical wire {N 2.7o') 1. Brief project desalptlon Pnclude anything that oould impact the 2. 24-51-5TX-10 and 24-AX-10 (SW r.tN 10TOWNSHIP 38 NORTH RANGE 78WEST) environment] 2. Leg allocation 3. 1 day 3. Duration of the project 4. Major equipment to be used 4. Backhoe The table below is to be completed by the Project Leed and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and contact the Technical Assurance Department.

116

Project title: Principal Investigator(s)  

E-Print Network [OSTI]

No. 0123 Project title: Principal Investigator(s): Funding Agency: Submission deadline: Instruments, redeployment costs) OBS engineering and technical support cost: (on shore and at sea) Shipping: Travel and technical support for OBS operations at sea. The cost of providing this support (e.g., instrument charges

Menke, William

117

EERE PROJECT MA.NAGEMENT CENTER NEPA DFTFIU.1INATION PROJECT  

Broader source: Energy.gov (indexed) [DOE]

Atchison Atchison u.s. DI!PARThIl1NT OF l?NERGY EERE PROJECT MA.NAGEMENT CENTER NEPA DFTFIU.1INATION PROJECT TITLE: EECBG DE-EEOOOO727 Atchison Library Ground Source Heat Pump Page 1 of2 STATE : KS Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE FOA 0000013 0 Based on my review of the information tORcuning the proposed action, as NEPA Compliam::e Officer (authorized under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

118

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Reclamation of Pits and Boxes Reclamation of Pits and Boxes Date: Nov. 11 , 2010 DOE Code: 6740.010.00000 Contractor Code: 8067-451 Project Lead: Anthony Bowler Project Overview 1. Brief project description [include anything that Reclamation of Q!!]y the following Pits and Boxes : 1. T-2-11 could impact the environment) 2. B-1-10 Pit 2. Legal location 3. B-1-3 Pit 3. Duration of the project 4. T .Q-3 Concrete Sump Box 4. Major equipment to be used 5. B-2-10 Skim Box 6. B-1-14 Skim Box 7. 66-1-StX-14 Pit 8. T-5-10 Pit 9. WDFSkim Box 10. WDFUpperPit 11 . WDFLowerPit 12. B-1-3 Skim Box 13. T-3-3 Skim Box 14. T-1-20 Pit 15. T-2-34 Pit (A) 16. T-2-34 Pit (B) 17. B-1 -10 Skim Box 18. Carwash Skim Box 19. 5~1-SX-3-Madison Water Valve Box from 57-WX-3 20. T-5-3 Pit

119

EDeMa (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

EDeMa EDeMa Country Germany Headquarters Location Mülheim, Germany Coordinates 51.427074°, 6.886492° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.427074,"lon":6.886492,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

120

MHK Projects/GCK Technology Cape Cod Canal MA US | Open Energy Information  

Open Energy Info (EERE)

GCK Technology Cape Cod Canal MA US GCK Technology Cape Cod Canal MA US < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.7433,"lon":-70.6093,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

MHK Projects/GCK Technology Merrimack River Amesbury MA US | Open Energy  

Open Energy Info (EERE)

River Amesbury MA US River Amesbury MA US < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.8549,"lon":-70.9267,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

122

U.S. DEPARTMENT OF ENERGY EERE PROJECT MA.i\IAGE\tiE~TCE~TER  

Broader source: Energy.gov (indexed) [DOE]

MA.i\IAGE\tiE~TCE~TER MA.i\IAGE\tiE~TCE~TER NEPA DETERMINATION Page 1 of2 RECIPIENT:Brayton Energy STATE: MA PROJECT TITLE: High-Efficiency Low-Cost Solar Receiver for use in a Supercritical C02 Recompression Cycle Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000595 DE-EE0005799 GF0-0005799-{)01 G05799 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination Information gathering (including, 'but not limited to, literature surveys, inventories, site vrsits, and audits}, data analysis (including, but not limited to, computer modeling}, document preparation

123

NEPA COMPLIANCE SURVEY J.-1{p Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

}:- }:- J.-1{p Project Information Project Title: Flowline leak @ 68-66-SX-34 Date: 1/26/2010 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview 011..- 1. What are the environmental Elimination of the flowline@ 68-66- SX-34. Dig up and locate leak. Take p ntaminated soil to land fann and impacts? record in log book. The duration of this project will be approx. 4-days. The equipment to be used is as follows backhoe, and welder. We will be eliminating the flowline and pumping to a tank set on location.So we don't 2. What is the legal location? have any leaks in the Mure. 3. What is the duration of the project? 4. What major equipment will be used if any (work over rig, drilling rig, etc.)? The table below Is to be completed by the Project Lead and nwlewed by the Environmental Specialist and the DOE NEPA

124

BEACON SOLAR ENERGY PROJECT (08-AFC-2) Project Title: Beacon Solar Energy Project (Beacon)  

E-Print Network [OSTI]

BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Project Title: Beacon Solar Energy Project and operate the Beacon Solar Energy Project (Beacon). Location: The project is located in eastern Kern County;BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Licensing: The Beacon project would have a nominal

125

u.s. DEPARTMENT OF ENERGY EERE PROJECT MA:-.IAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

MA:-.IAGEMENT CENTER MA:-.IAGEMENT CENTER NEPA DETERMINATION RECIPIENT:Utah State University PROJECT TITLE: Alternative and Unconventional Energy Research and Development Page 1 of2 STATE: UT Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number COP DE-EEOOO3114 GF0-0003114-OO2 0 Based on my review or the information concerning the proposed action, as NEPA Compliance Officer (authorized under DO E Order 45 1.1A), I have made the following determination: CX, EA, [IS APPENDIX AND NUMBER: Description: B3.6 Siting. oonstruction (or modification), operation. and decommissioning of facilities for indoor bench-scale research projects and oonventionallaboratory operations (for example. preparation of chemical standards and sample analysis):

126

Geothermal: Sponsored by OSTI -- Project Title: Small Scale Electrical...  

Office of Scientific and Technical Information (OSTI)

Project Title: Small Scale Electrical Power Generation from Heat Co-Produced in Geothermal Fluids: Mining Operation Geothermal Technologies Legacy Collection HelpFAQ | Site Map |...

127

u.s. DEPARTIIIENT OF ENERGY EERE PROJECT MA N A GE M E~ T CENT  

Broader source: Energy.gov (indexed) [DOE]

MA N A GE M E~ T CENT MA N A GE M E~ T CENT ER NEPA DETERlIlINATION Page 1 of2 RECIPIENT:Power Environmental Energy Research Institute STATE: CO PROJECT TITLE: Novel Multidimensional Tracers for Geolhermallnter-Well Diagnostics Funding Opportunity Announcement Number DE-PS36-09G099018 Procurement Instrument Number OE·EEOOO3032 NEPA Control Number GFO-1 0-345 CID Number G03032 Based on my review orlhe Information concerning the proposed action, as NEPA Compliance Officer (authoriud under DOE Order 4SI.IA),1 have made the following determination: ex, EA, [IS APPENDIX AND NUMBER: Description: 83.1 Onsile and offsite site characterization and environmental monitoring. including siting, construction (or modification), operation, and dismantlement or closing (abandonment) of characterization and monitoring devices and siting,

128

u.s. DEPARTMENT OF ENERGY EERE PROJECT MA->.IAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

MA->.IAGEMENT CENTER MA->.IAGEMENT CENTER NEPA DETFRMINATION RECIPIENT;AWS Truepower, LlC Page 1 of2 STATE: NY PROJECT TITLE: National Offshore Wind Energy Resource and Design Data Campaign - Analysis and Collaboration Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number DE-FOA-0000414 DE-EEOOO5372 GF0-0005372-OO1 0 Based on my review oflhe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audits), data analysis (including, but not limited to, computer modeling), document preparation (including, but not limited to, conceptual design,

129

U.S. DEPARTMENT OF ENERGY EERE PROJECT MA>" AGEMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

MA>" AGEMENT CENTER MA>" AGEMENT CENTER NEPA DETERMINATION RECIPIENT:Oregon Department of Energy PROJECT TITLE: Oregon EECBG Fonnula - City of Winston Page I of3 STATE: OR Funding Opportunity Announcement Number DE-FOA-OOOOO13 Procurement Instrument Number NEPA Control Number em Number EEO Based on my review crthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4Sl.I A), I have made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description : B1.3 Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (e.g .* pathways, roads, and railroads ), vehides and eqUipment, and localized vegetatJon and pest control, dunng which operations may be suspended and resumed. Custodial services are activities to preserve facility appearance, worl

130

U.S. DEPARTMENT OF ENERGY EERE PROJECT MA,"iAGEMENTCENTER NEPADETl!RMINATION  

Broader source: Energy.gov (indexed) [DOE]

MA,"iAGEMENTCENTER MA,"iAGEMENTCENTER NEPADETl!RMINATION RECIPIENT:CU Cfeantech -- University of Colorado PROJECT TITLE: CU Cleantech New Venture Challenge Page 1 of2 STATE: CO Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number elD Number DE-FOAOOOOS70 EE0005600 GFO-OOO5600-OO1 0 Based on my review of the information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 4Sl.1A), I have made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and disseminatio n Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audits). data analysis (including. but not limited to, computer modeling), document preparation (including. but not limited to, conceptual design,

131

u.s. DEPARTMENT OF ENERGY EERE PROJECT MA..\lAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

lAGEMENT CENTER lAGEMENT CENTER NFPA DEl'ERAllNAIION RECIPIENT:MA DEPT. OF ENERGY RESOURCES PROJECT TITLE: STATE ENERGY PROGRAM (SEP) Page 1 of2 STATE: MA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number DE·FOA.()()()()643 R130372 GF0-0130372-OO1 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authori;.o;ed under DOE Order 45 1.lA), I have made the following de termination : ex, EA, EIS APPENDIX AND NUMBER: Description: A11 Technical advice and as sistance to o rganizations A9 Info rm at ion gathering, analysis, and d issemination Rational for detennination: Technical advice and planning assistance to international, national, state, and local organizations. Information gathering (including, but nollimited to, literature surveys, inventories, site visits, and

132

U.S. DEP.~TMENT OF ENERGY EERE PROJECT MA,\jAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

MA,\jAGEMENT CENTER MA,\jAGEMENT CENTER NEPA DETERMINATION Page I of2 RECIPIENT: EECBG - American Samoa Government Territorial Energy Office STATE: AS PROJECT TITLE: Improving Recycling Capacity and Solid Waste Education in American Samoa Funding Opportunity Announcement Number PrO(urement Instrument Number DE-EEOOOOB34 NEPA Control Number GFO-OOOO634.Q01 em Number o Based on my review oftbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I have made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 81 .31 installation or relocation of machinery and equipment Installation or relocation and operation of machinery and equipment (including, but not limited la, laboratory equipment, electronic hardware, manufacturing machinery, maintenance equipment, and health and safety equipment), provided that

133

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source  

E-Print Network [OSTI]

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source UF Minor Projects for UF 50,000 Minor projects for facilities located and education. Typical projects consist of Gainesville/ Typical projects other funding greenhouses, general

Slatton, Clint

134

Independence) PROJECT TITLE: Clinton Community Human Service Campus Project  

Broader source: Energy.gov (indexed) [DOE]

Area Substance Abuse Council, Inc (a SEP subrecipient of the Iowa Office of Energy STATE: IA Area Substance Abuse Council, Inc (a SEP subrecipient of the Iowa Office of Energy STATE: IA Independence) PROJECT TITLE: Clinton Community Human Service Campus Project Page 1 of2 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE FOA 000052 EE0000162 GFO-0000162-015 EE162 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

135

Project Information Form Project Title Urban Spatial Structure and GHG Emissions  

E-Print Network [OSTI]

Project Information Form Project Title Urban Spatial Structure and GHG Emissions University UC specified GHG reduction targets. This requires clear evidence that links from urban spatial structure

California at Davis, University of

136

U.S. DEPARTMENT OF ENERGY EERE PROJECT MA.>.JAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

, .* !. , .* !. U.S. DEPARTMENT OF ENERGY EERE PROJECT MA.>.JAGEMENT CENTER NEPA DETERMINATION RECIPIENT:Laram!e County Community College PROJECT TITLE: LeGe Ulilty-Scale Wind Energy Technology Page 1 of2 STATE: WY Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-PS36-09G099OO9 DE-EEOOOO538 GFO-10-052 0 Based on my review of the information concerning the proposed action, as Nt:PA Compliance Officer (autbori7.ed under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathenng (including, but not limited to, literature surveys, Inventones, audits), data analySIS (including computer modeling), document preparation (such as oonceptual des'9n or feasibility studies, analytical energy supply

137

U.S. DEP.'\RTMENT OF ENERGY EERE PROJECT MA.1II AGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

'\RTMENT OF ENERGY '\RTMENT OF ENERGY EERE PROJECT MA.1II AGEMENT CENTER NEPA DETERMINATION RECIPIENT :Freshwater Wind I. lLC PROJECT TITLE: Shallow Water Offshore Wind System Optimization for the Great Lakes Page 1 of2 STATE: OH Funding Opportunity Announcement Number Procurement Instl"ument Number NEPA Control Number elD Number DE-FOA.Q000415 DE-EEOOOO5488 GFO-OOO5488-001 0 Based on my nview or the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SUA),. have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathertng, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site Visits, and audits). data analysis

138

U.S. DEPARTI\lIENT OF ENERGY EERE PROJECT MA."IAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

lIENT OF ENERGY lIENT OF ENERGY EERE PROJECT MA."IAGEMENT CENTER NEPA DETERMINATION RECIPIENT:Louisiana State University and A&M College Page 1 of2 STATE: LA PROJECT TITLE: Geothennal Resource Development with Zero Mass Withdrawal, Engineered Free Convection, and Wellbore Energy Conversion Funding Opportunity ADDounc:ement Number Procurement Instrument Number NEPA Control Number CID Number DE-F0-0000336 OE-EEOOO5125 GF0-0005125-001 0 Based on my review (lrtbe infor madOD concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A),1 have' made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (induding, but not limited to, literature surveys, inventories, audits). data analysIs (including

139

u.s. DEP.-\RTMENT OF ENERGY EERE PROJECT MA. AGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

RTMENT OF ENERGY RTMENT OF ENERGY EERE PROJECT MA. AGEMENT CENTER NEPA DETERMINATION RECIPIENT :louisiana Department of Natural Resources PROJECT TITLE: State of louisana ARRA-EECBG-St. James Parish (Tl Page 1 of2 STATE : LA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOOO13 EEOOOO735 0 Based on my review or lhe information concerning tbe proposed action, as NEPA Compliance Officer (autborized under DOE Order 4S1.1A), I bave made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do nol increase the indoor concentrations of potentially harmful substances. These actions may involve financia

140

DEPART:MENT OF ENERGY EERE PROJECT MA..'JAGEMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

MENT OF ENERGY MENT OF ENERGY EERE PROJECT MA..'JAGEMENT CENTER NEPA DETERMINATION Page 1 of2 RI<:CIPIENT:Wyoming Business Council, State Energy Office STATE: WY PROJECT TITLE: State Energy Program (SEP) PY 2012 Forumla Grant funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000643 DE-FG26-07NT43207 GF(H)()43207-OO1 Based on my review of the information concerning the proposed aetion, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination A11 Technical advice and assistance to organizations Rational for detennination: Information gathering (including, but not limited to, literature surveys, inventories, site visits, and

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

MA.+'  

Office of Legacy Management (LM)

MA.+' MA.+' t -@ . ;' OAK RIDGE NATIONAL LABORATORY i OPtRATED BY MARTIN MARIETTA ENERGY SYSTEMS, INC. FOR THE UNITE0 STATES DEPARTMENT OF ENERGY ,,y , - IhI of ORNL/TM-10053 RESULTS OF THE RADIOLOGICAL SURVEY AT THE VENTRON SITE, BEVERLY, MASSACHUSETTS W. D. Cottrell R. F. Carrier -.- _ ..-. - . . . -~~.- ~~- Printed in the United States of America. Available from National Technical Information Service U.S. Department of Commerce 5285 Port Royal Road, Springfield, Virginia 22161 NTIS price codes-Printed Copy: ~06 Microfiche A01 This report was prepared as an account of work sponsored by an agency of the United StatesGovernment. Neither the U nited StatesGovernment nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or

142

U.S. DEPAR.Th.IENT OF ENERGY EERE PROJECT MA'\IAGEME~TCE~TER  

Broader source: Energy.gov (indexed) [DOE]

Th.IENT OF ENERGY Th.IENT OF ENERGY EERE PROJECT MA'\IAGEME~TCE~TER NEPA DETFID..ITNATION RECIPIENT:Ciemson University PROJECf TITLE: Clemson University 15MW Hardware-In-the-Loop (HIL) Grid Simulator Page 1 of2 STATE: SC Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number N/A (DNFA) DE-EE0005723 GF0-0005723-001 Based on my review of the information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 45l.1A), l have made tbe foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audits), gathering, analysis, data analysis (including, but not limited to, computer modeling), document preparation (including, but

143

U.S. DEPARTMENT OF ENERGY EERE PROJECT MA;"AGEMENT CENTER NEPA DET1!R1.IINATION  

Broader source: Energy.gov (indexed) [DOE]

O". )' O". )' U.S. DEPARTMENT OF ENERGY EERE PROJECT MA;"AGEMENT CENTER NEPA DET1!R1.IINATION RECIPIENT:Resolute Marine Energy, Inc. PROJECT TITLE: Wave-Actuated Power Take Off Device for Electricity Generation Page 1 of2 STATE: MA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-OOOO293 DE-EEOOO4565 GFO-OOO4565-001 0 Based on my review orthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Ordtr451.IA), I have made tbe rollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including , but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

144

Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project -Compliance  

E-Print Network [OSTI]

DOCKETED Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project - Compliance TN schedule and procedures necessary to conclude the amendment review process. At the Prehearing Conference

145

Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project -Compliance  

E-Print Network [OSTI]

DOCKETED Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project - Compliance TN-700-2009-004.PDF #12;2 Notice of Committee's Intention to Use Informal Hearing Procedures Pursuant

146

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project  

E-Print Network [OSTI]

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project Sponsor: Columbia. Principal goals are to assess survival and straying at adulthood. Net pens are proposed as a low cost

147

Project Information Form Project Title Assessment of Critical Barriers to Alternative and Renewable Fuel and  

E-Print Network [OSTI]

Project Information Form Project Title Assessment of Critical Barriers to Alternative and Renewable Fuel and Vehicle Deployment University UC Davis Principal Investigator Amy Jaffe Andrew Burke PI models are necessary to promote adequate investment in promising alternative vehicle technologies

California at Davis, University of

148

Project Information Form Project Title Integrating Management of Truck and Rail Systems in Los Angeles  

E-Print Network [OSTI]

Project Information Form Project Title Integrating Management of Truck and Rail Systems in Los or organization) Volvo Research and Educational Foundation- $79,604.00 Total Project Cost $79,604.00 Agency ID of Research Project This project will develop models to optimize the balance of freight demand across rail

California at Davis, University of

149

Project Information Form Project Title Spatial Dynamics of the Logistics Industry and Implications for Freight  

E-Print Network [OSTI]

or organization) Caltrans $50,000 Total Project Cost $50,000 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Spatial Dynamics of the Logistics Industry and Implications and End Dates August 15, 2014 to August 14 2015 Brief Description of Research Project This project

California at Davis, University of

150

Name Title of Project Site Supervisor and  

E-Print Network [OSTI]

in Yolo County's Department of Public Health Hoa Tan, Program Director, Emergency Preparedness, Yolo Community Health Assessment Project Jill Cook, MS, RN, PHN, Director of Health, Yolo County Health Department 500 Jefferson Blvd. West Sacramento, CA 95691 (916) 375-6380 jill.cook@yolo county.org BK Yoo, MD

Leistikow, Bruce N.

151

Project Information Form Project Title White Paper on Climate Adaptation for State DOTs and Local Agencies  

E-Print Network [OSTI]

Project Information Form Project Title White Paper on Climate Adaptation for State DOTs and Local each agency or organization) DOT $30,000 Total Project Cost $30,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates January 2014 to December 2014 Brief Description of Research Project

California at Davis, University of

152

Project Information Form Project Title White Paper on The application of permeable pavement with emphasis  

E-Print Network [OSTI]

Project Information Form Project Title White Paper on The application of permeable pavement (by each agency or organization) Cal Trans Total Project Cost $29,007 Agency ID or Contract Number Project Depending on the type of surface pavement, permeable pavement can be termed as porous asphalt

California at Davis, University of

153

Project Title Improved Emission Models for Project Evaluation (MOVES-Matrix) University Georgia Institute of Technology  

E-Print Network [OSTI]

Project Title Improved Emission Models for Project Evaluation (MOVES-Matrix) University Georgia or organization) DOT - $92,292.15 Total Project Cost $92,292.15 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates November 2013 - June 2015 Brief Description of Research Project Local governments are using

California at Davis, University of

154

Project Information Form Project Title Reduction of Lifecycle Green House Gas Emissions From Road  

E-Print Network [OSTI]

Project Information Form Project Title Reduction of Lifecycle Green House Gas Emissions From Road@ucdavis.edu Funding Source(s) and Amounts Provided (by each agency or organization) US DOT $30,000 Total Project Cost Brief Description of Research Project This white paper will summarize the state of knowledge and state

California at Davis, University of

155

Project Information Form Project Title Impact of Legislative Mandates on Transportation Workforce Capacity  

E-Print Network [OSTI]

or organization) DOT $95,000 Total Project Cost $95,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and EndProject Information Form Project Title Impact of Legislative Mandates on Transportation Workforce Dates August 1, 2014 to July 31, 2015 Brief Description of Research Project The transportation industry

California at Davis, University of

156

Project Information Form Project Title Accelerating Commercialization of Alternative and Renewable Fuels and  

E-Print Network [OSTI]

or organization) CEC $344,546 Total Project Cost $344,546 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Accelerating Commercialization of Alternative and Renewable and End Dates June 30, 2014 to June 30, 2016 Brief Description of Research Project Alternative

California at Davis, University of

157

Project Information Form Project Title Exploring Unintended Environmental and SocialEquity Consequences of  

E-Print Network [OSTI]

Source(s) and Amounts Provided (by each agency or organization) Caltrans $91,829 Total Project Cost $92Project Information Form Project Title Exploring Unintended Environmental and Social Brief Description of Research Project Communities throughout the U.S. are pursuing land use

California at Davis, University of

158

Project Information Form Project Title Using Connected Vehicle Technology for Advanced Signal Control  

E-Print Network [OSTI]

,387 Total Project Cost $59,387 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates 4/14/2014 ­ 9Project Information Form Project Title Using Connected Vehicle Technology for Advanced Signal/30/15 Brief Description of Research Project Today's conventional traffic control strategies typically rely

California at Davis, University of

159

Project Information Form Project Title Designing and Analyzing Policies for Renewable Fuels  

E-Print Network [OSTI]

or organization) US DOT $38,942 Total Project Cost $38,942 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Designing and Analyzing Policies for Renewable Fuels and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Federal and state

California at Davis, University of

160

Project Information Form Project Title Designing and Analyzing Policies for Renewable Fuels  

E-Print Network [OSTI]

or organization) US DOT $38,925 Total Project Cost $38,925 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Designing and Analyzing Policies for Renewable Fuels and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Federal and state

California at Davis, University of

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Project Information Form Project Title The Role of Environmental Concerns, Lifestyles, Mobility-Related  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) Cal Trans $92,070.27 Total Project Cost $92Project Information Form Project Title The Role of Environmental Concerns, Lifestyles, Mobility Brief Description of Research Project Recent research has highlighted significant modifications

California at Davis, University of

162

Project Information Form Project Title White Paper on Performance Based Approaches to Incentivize Local Adoption of  

E-Print Network [OSTI]

Provided (by each agency or organization) Caltrans $23,385 Total Project Cost $23,385 Agency ID or ContractProject Information Form Project Title White Paper on Performance Based Approaches to Incentivize of Research Project This white paper will consider how to incentivize local government adoption of land use

California at Davis, University of

163

Project Information Form Project Title Intercity Travel in Northeaster Non-metropolitan Regions: What Roles do  

E-Print Network [OSTI]

) USDOT $73,000 Total Project Cost $73,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End DatesProject Information Form Project Title Intercity Travel in Northeaster Non-metropolitan Regions September 2014 to August 2016 Brief Description of Research Project Little is known about intercity travel

California at Davis, University of

164

Project Information Form Project Title Innovative Data Collection to Improve Transit Service Assessment  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) DOT - $102,971.57 Total Project Cost $102,971.57 AgencyProject Information Form Project Title Innovative Data Collection to Improve Transit Service of Research Project Mobile information technology will be used to compare travel behavior of populations

California at Davis, University of

165

Project Information Form Project Title Eco-Driving to Reduce Emissions Cars (Behavioral Focus)  

E-Print Network [OSTI]

Source(s) and Amounts Provided (by each agency or organization) USDOT $34,618.33 Total Project Cost $34Project Information Form Project Title Eco-Driving to Reduce Emissions ­ Cars (Behavioral Focus Description of Research Project The purpose of this review is to provide energy and environment policy makers

California at Davis, University of

166

Project Information Form Project Title Intercity Travel in Northeastern Non-metropolitan Regions: What Roles do  

E-Print Network [OSTI]

) USDOT $73,000 Total Project Cost $73,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End DatesProject Information Form Project Title Intercity Travel in Northeastern Non-metropolitan Regions September 2014 to August 2016 Brief Description of Research Project Little is known about intercity travel

California at Davis, University of

167

Project Information Form Project Title Working toward a policy framework for reducing greenhouse gas  

E-Print Network [OSTI]

Provided (by each agency or organization) US DOT $37,874 Total Project Cost $37,874 Agency ID or ContractProject Information Form Project Title Working toward a policy framework for reducing greenhouse of Research Project This white paper is concerned with a preliminary investigation of the extent to which

California at Davis, University of

168

Project Information Form Project Title Advanced Energy Management Strategy Development for Plug-in Hybrid  

E-Print Network [OSTI]

,365 Total Project Cost $58,365 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates April 1, 2014Project Information Form Project Title Advanced Energy Management Strategy Development for Plug ­ September 30, 2015 Brief Description of Research Project Plug-in hybrid vehicles (PHEVs) have great

California at Davis, University of

169

Project Information Form Project Title White Paper of Assessing Transportation Financing Options from a Green  

E-Print Network [OSTI]

or organization) US DOT $23,700 Total Project Cost $23,700 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title White Paper of Assessing Transportation Financing Options and End Dates June 15, 2014 to August 31, 2014 Brief Description of Research Project The Highway Trust

California at Davis, University of

170

Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle-Based  

E-Print Network [OSTI]

,931.44 Total Project Cost $98,931.44 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates November 1Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle, 2014 ­ October 31, 2015 Brief Description of Research Project Current greenhouse gas emissions

California at Davis, University of

171

Project Information Form Project Title Managing Roadway Systems to Reduce GHG Emissions and Improve  

E-Print Network [OSTI]

or organization) $25,217 Total Project Cost $25,217 Agency ID or Contract Number DTRT13-G-UTC29 Start and EndProject Information Form Project Title Managing Roadway Systems to Reduce GHG Emissions and Improve Dates 4/1/14 ­ 3/30/15 Brief Description of Research Project There have been a variety of traffic

California at Davis, University of

172

Project Information Form Project Title Reducing Truck Emissions and Improving Truck Fuel Economy via ITS  

E-Print Network [OSTI]

each agency or organization) US DOT $90,000 Total Project Cost $90,000 Agency ID or Contract NumberProject Information Form Project Title Reducing Truck Emissions and Improving Truck Fuel Economy Project Currently trucks are viewed as any other vehicle in traffic management Currently trucks are viewed

California at Davis, University of

173

Project Information Form Project Title Urban Spatial Structure and GHG Emissions  

E-Print Network [OSTI]

Source(s) and Amounts Provided (by each agency or organization) Caltrans $79,375 Total Project Cost $79Project Information Form Project Title Urban Spatial Structure and GHG Emissions University USC Brief Description of Research Project The evidence on land use and travel shows that employment access

California at Davis, University of

174

Project Title and Principal Investigators FY 2014 Federal  

E-Print Network [OSTI]

Sea Grant Program Project Title and Principal Investigators FY 2014 Federal Funding * FY 2014, NY, RI, WHOI Buy Out or Build Back? A Comparative Assessment of Approaches to Employing Public Stewards Academies in Maryland (Dana R. Fisher) $69,999 $35,007 MI Development of Stable Open Channel

175

U.S. DEPAR.Th:IENT OF ENERGY EERE PROJECT MA1\JAGEME~T CE~TER  

Broader source: Energy.gov (indexed) [DOE]

Th:IENT OF ENERGY Th:IENT OF ENERGY EERE PROJECT MA1\JAGEME~T CE~TER NEPA DETEin:ITNATION Page 1 of2 RECIPIENT:City of Henderson; Henderson; NV STATE: NV PROJECT TITLE : Henderson Solar Energy Project Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-EE0003166 GF0-0003166-003 G03166 Based on my review ofthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.16 Solar photovoltaic systems The installation, modification, operation, and removal of commercially available solar photovoltaic systems located on a building or other structure (such as rooftop, parking lot or facility, and mounted to s1gnage,

176

U.S. DEPARTI\t.IENT OF ENERGY EERE PROJECT MA.J'\JAGE\ofENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

t.IENT OF ENERGY t.IENT OF ENERGY EERE PROJECT MA.J'\JAGE\ofENT CENTER NEPA DETERMINATION Page 1 of2 RECIPIENT:San Diego State University STATE: CA PROJECT TITLE: A Small Particle Solar Receiver for High Temperature Brayton Power Cycles Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number DE-SOL-0000595 DE-EE0005800 GF0-0005800-001 G05800 Based on my review oftbe information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 83.6 Small-scale research and development. laboratory operations, and pilot projects Rational for determination: Siting, construction, modification, operation, and decommissioning of facilities for smallscale research

177

Project Title: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY  

Broader source: Energy.gov (indexed) [DOE]

DOE Code: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY # 258 Project lnfonnation Rewire electrical to pole at 77SHX10 Mike Preston Date: 11-19-09 Contractor Code: Project Overview No~ rea has been previously disturbed. The trenching will be th,ugh pre-existing right of way for the 1. What are the environmental ~ ~=~d ~ impacts? 2. What is the legal location? Repair a~ replacement of electrical lines to the Pole next to well at 77S~1 0. This will require trenching 3. What is the duration of the project? across the road a~ to the pole. Removing old lines and replacement of lines. 4. What major equipment will be used if any (wor1< over rig, drilling rig, 1 day etc.)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

178

NEPA COMPLIANCE SURVEY Project Information Project Title: Liner Drilling Date:  

Broader source: Energy.gov (indexed) [DOE]

Liner Drilling Date: Liner Drilling Date: 4-5-10 DOE Code: 71092 Cont ractor Code: 8067-766 Project Lead: Frank Ingham Project Overview Nothing out of the ordinary for drilling an existing location 1. What are the environmental impacts? NE SW Sec 21 , T39N, R78W (45-3-X-21 well) 2. What is the legal location? 3. What is the duration of the project? Approximately a week 4 . What major equipment will be used if any (work over rig, drilling rig, Drilling Rig etc.)? Will Drill out of 9 5/8 caslng with liner drillng assembly. After drilling approximately 750 to 1000 ft, will test liner hanging assembly set and retrieve multiple times. The table b elow is to be completed by the Project Lead and reviewed by the Environmental Specialis t and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey a

179

NEPA COMPLIANCE SURVEY Project Information Project Title: Express Stack Tools  

Broader source: Energy.gov (indexed) [DOE]

Express Stack Tools Express Stack Tools Date: 11/16/2010 DOE Code: 6730.020.81023 Contractor Code: 8067-971 Project Lead: Brian Black Project Overview 1) This project will test open and cased Hole logging tools in multiple wells. The tools to be testied include: 1. Brief project description [include anything that could impact the natural gamma, borehole temperature, compensated neutron, compensated density with PE, dual environment] induction/short guard, neutron prompt gamma, and acoustic televiewer tool. Radioactive sources will be run in the well as part of the toolstring. 2. Legal location 3. Duration of the project 2) 48-X-28 well location, SE %, SW %, Tsp 39N Rng 78W, Section 28; 45::3-X-21 well location, NE %, SW 4. Major equipment to be used %, Tsp 39N, Rng 78W, Section 21; 46-TpX-10 well location, NE %, SW Y.., Tsp38N, Rng 78W, Section 10.

180

Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure to Accommodate  

E-Print Network [OSTI]

Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure Project Natural gas is often touted as a `bridge' to low carbon fuels in the heavy duty transportation sector, and the number of natural gas-fueled medium and heavy-duty fleets is growing rapidly. Research

California at Davis, University of

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Project Information Form Project Title Routing Strategies for Efficient Deployment of Alt. Fuel Vehicles for  

E-Print Network [OSTI]

agency or organization) US DOT $90,000 Total Project Cost $90,000 Agency ID or Contract Number DTRT13-GProject Information Form Project Title Routing Strategies for Efficient Deployment of Alt. Fuel-UTC29 Start and End Dates May 16, 2014 to May 31, 2015 Brief Description of Research Project

California at Davis, University of

182

Project Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt Pavement (RAP),  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) Caltrans $90,315 Total Project Cost $90,315 Agency IDProject Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt of Research Project As virgin material sources become increasingly scarce, and the volume of pavement material

California at Davis, University of

183

Project Information Form Project Title Environmentally Friendly Driving Feedback Systems Research and  

E-Print Network [OSTI]

Provided (by each agency or organization) Caltrans $136,000 Total Project Cost $136,000 Agency IDProject Information Form Project Title Environmentally Friendly Driving Feedback Systems Research of Research Project Among several strategies to reduce fuel consumption and greenhouse gas emissions from

California at Davis, University of

184

Project Information Form Project Title Design and Analysis of Feebate Policies for Sustainable ZEV and Other  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) US DOT $36,442 Total Project Cost $36,442 Agency IDProject Information Form Project Title Design and Analysis of Feebate Policies for Sustainable ZEV of Research Project Zero-emission vehicles (ZEVs) are expected to play a critical role in decarbonizing light

California at Davis, University of

185

Project Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt Pavement (RAP),  

E-Print Network [OSTI]

(s) and Amounts Provided (by each agency or organization) Caltrans $90,538 Total Project Cost $90,538 Agency IDProject Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt of Research Project As virgin material sources become increasingly scarce, and the volume of pavement material

California at Davis, University of

186

Project Information Form Project Title Exploring Unintended Environmental and Social-Equity Consequences of  

E-Print Network [OSTI]

to simulate the effect of plans on rents, location of low income households, and travel (mode, trips, autoProject Information Form Project Title Exploring Unintended Environmental and Social and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Communities

California at Davis, University of

187

NEPA COMPLIANCE SURVEY Project Information Project Title: Casing Drilling Test  

Broader source: Energy.gov (indexed) [DOE]

Casing Drilling Test Casing Drilling Test Date: 5-17-201 1 DOE Code: 6730-020-72000 Contractor Code: 8067-806 Project Lead: Marl< Duletsky Project Overview 1, Brief project description ~nclude The existing 13-1-SX-23 location and entry road will be reworlproject 4. Major equipment to be used

188

Project title: Cottonwood-Roseville Optical Groundwire Project  

Broader source: Energy.gov (indexed) [DOE]

Cottonwood-Roseville Optical Groundwire Project Cottonwood-Roseville Optical Groundwire Project Requested By: Joe Oloriz Mail Code: N5706 Phone: 916-353-4773 Date Submitted: 7-3-13 Date Required: 7-8-13 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, switchyards, and facilities throughout California. Western must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. The process of marketing and delivering electric power through transmission facilities requires a great

189

u.s. DEP.-illThIl!NT OF ENERGY EERE PROJECT MA"IAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

illThIl!NT OF ENERGY illThIl!NT OF ENERGY EERE PROJECT MA"IAGEMENT CENTER NEPA DE:rJ!IU...lINATION RECIPIENT:TX STATE ENERGY CONSERVATION OFFICE PROJECT TITLE: SHARYLAND ISD Page 1 of2 STATE: TX Funding Opportunity Announcement Number Procurement Instmment Number NEPA Control Number CIO Number DE-EEOOO116 DE-EEOOO116 GFO-OOO0116-032 GOO Based OD my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination : ex, EA, EIS APPENDIX AND NUMBER: Description: 85.16 Solar photovoltaic systems The installation, modification. operation, and removal of commercially avaUable solar photovoltaic systems located on a building or other structure (such as rooftop, par1o:.ing lot or facility, and mounted to signage, lighting, gates, or fences), or if

190

U.S. DFPAR.Tl\IFNT OF ENERGY EERE PROJECT MA:'\1AGE\1ENTCEN rER  

Broader source: Energy.gov (indexed) [DOE]

Tl\IFNT OF ENERGY Tl\IFNT OF ENERGY EERE PROJECT MA:'\1AGE\1ENTCEN rER NEPA DETFRl\.ITNATION Page 1 of2 RECIPIENT:Southwest Research Institute STATE: TX PROJECT TITLE : Optimizing the CSP Tower Air Brayton Cycle System to meet the SunShot Objectives Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000595 DE-EE0005805 GF0-0005805-001 Based on my review oftbe information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made tbe foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site visits, and

191

U.S. DEP.-illTUENT OF ENERGY EERE PROJECT MA"AG EM ENT CEN T  

Broader source: Energy.gov (indexed) [DOE]

illTUENT OF ENERGY illTUENT OF ENERGY EERE PROJECT MA"AG EM ENT CEN T ER NEPA DETERl\IINATION RECIPIENT:City of San Antonio PROJECT TITLE: City of San Antonio ARRA·EECBG * Activity #7 (S) Page 1 of2 STATE: TX Funding Opportunity Announcement Number 81.128 Procurement Instrument Number DE·EEOOOO970 NEPA Control Number cm Number o Based on my review ofthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45 I. IA), I have made the followin g determination: CX, EA , EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

192

DEPARTII'IENT OF ENERGY EERE PROJECT MA'<AGEMENT CENTER Nl!PA DETEIU.fiNATION  

Broader source: Energy.gov (indexed) [DOE]

DEPARTII'IENT OF ENERGY DEPARTII'IENT OF ENERGY EERE PROJECT MA'PROJECT TITLE : Program Year 2012 State Energy Program Formula Grants Page 1 of2 STATE: fD Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number DE-FOA0000643 DE-EEOOO3681 GFD-0003681-OO3 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45 1. IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination A11 Technical advice and assistance to organizations Rational for determination: Information gathering (induding, but not limited to, literature surveys, inventories, site visits, and

193

Project Information Form Project Title The Development of Lifecycle Data for Hydrogen Fuel Production and  

E-Print Network [OSTI]

Project Information Form Project Title The Development of Lifecycle Data for Hydrogen Fuel will be technologies and fuels related to renewable hydrogen. The literature review will produce a set of hydrogen hydrogen or hydrogen produced with technologies or fuels not currently in the LCFS. The study will assess

California at Davis, University of

194

RECIPIENT:Bowling Green State University STATE: OH PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

', ', , , 1'.1 'Pagf;: 1 of 2 RECIPIENT:Bowling Green State University STATE: OH PROJECT TITLE: Coastal Ohio Wind Project for Reduced Barriers to Deployment of Offshore Wind Energy Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number COP DE-EE0003871 GFO-0003871-001 EE3871 Based on my review oftlle information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.IA), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

195

TITLE: HVAC TESTING & BALANCING FOR MAJOR AND MINOR PROJECTS OBJECTIVE AND  

E-Print Network [OSTI]

TITLE: HVAC TESTING & BALANCING FOR MAJOR AND MINOR PROJECTS OBJECTIVE AND PURPOSE: To provide an independent test & balance for the adjustment of all HVAC systems in all major projects and minor projects

Fernandez, Eduardo

196

RECIPIENT:Chesterfield County PROJECT TITLE: EECBG Lighting Retrofit  

Broader source: Energy.gov (indexed) [DOE]

Chesterfield County Chesterfield County PROJECT TITLE: EECBG Lighting Retrofit Page 1 of2 STATE: VA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000013 DE-EE0000874 GFO-0000874-001 0 Based 011 my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

197

RECIPIENT:Utah County STATE: UT PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Utah County STATE: UT Utah County STATE: UT PROJECT TITLE: EECBG - Utah County Energy Efficiency Retrofits Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-OOOOO13 EEOOOO889 GFO-O000889-002 EEO Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: Cx, EA, EIS APPENDIX AND NUMBER: Description: A11 Technical advice and planning assistance to international, national, state, and local organizations. A9 Information gathering (including, but not limited to, literature surveys, Inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

198

Standard Operating Procedure (SOP) for (title of project, experiment, reaction or process) Date of Preparation: ____________________________  

E-Print Network [OSTI]

Standard Operating Procedure (SOP) for (title of project, experiment, reaction or process and ensuring that this procedure is carried out: _________________________________________________ HEALTH

Sura, Philip

199

Project Information Form Project Title Bicyclist Behavior in San Francisco: A Before-and-After Study of the  

E-Print Network [OSTI]

Project Information Form Project Title Bicyclist Behavior in San Francisco: A Before(s) and Amounts Provided (by each agency or organization) Caltrans $56,707 Total Project Cost $56,707 Agency ID of Research Project Many cities in California are investing bicycle infrastructure as a way to increase

California at Davis, University of

200

Project Information Form Project Title White Paper on the Future of Passenger Travel Demand in the United  

E-Print Network [OSTI]

each agency or organization) Caltrans $26,383 Total Project Cost $26,383 Agency ID or Contract NumberProject Information Form Project Title White Paper on the Future of Passenger Travel Demand DTRT13-G-UTC29 Start and End Dates September 2014 to June 2015 Brief Description of Research Project

California at Davis, University of

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Project Information Form Project Title Do California Highways Act as Barriers to Gene Flow for Ground-Dwelling  

E-Print Network [OSTI]

(by each agency or organization) Caltrans $78,395 Total Project Cost $78,395 Agency ID or ContractProject Information Form Project Title Do California Highways Act as Barriers to Gene Flow of Research Project Roads can act as significant barriers to wildlife dispersal, creating small fragmented

California at Davis, University of

202

Project Information Form Project Title White Paper on the Future of Passenger Travel Demand in the United  

E-Print Network [OSTI]

each agency or organization) DOT $26,383.66 Total Project Cost $26,383.66 Agency ID or Contract NumberProject Information Form Project Title White Paper on the Future of Passenger Travel Demand Project This white paper will summarize recent research findings pertaining to future passenger travel

California at Davis, University of

203

Project Information Form Project Title White Paper on the Effectiveness of Land Use and Demand Strategies in  

E-Print Network [OSTI]

DOT $12,000 Cal Trans Total Project Cost $42,533 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title White Paper on the Effectiveness of Land Use and Demand and End Dates June 30, 2014 to January 30, 2015 Brief Description of Research Project Reducing vehicle

California at Davis, University of

204

RECIPIENT:EES I PROJECT TITLE u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

EES EES I PROJECT TITLE : u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION Tennessee Energy Efficient Schools Initiative Ground Source Heat Pump Page 1 of2 ~ ~~ STATE: TN Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE·FOA-EEOOOO116 DE-EEOOO3007 GFO..QOO3007-OO3 0 Based on my review o(tbe informafioD concerning the proposed actioD, as NEPA Compliance Officer (authorized under DOE Order-451.1A),1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including , but nollimited 10, literature surveys, inventories, audits), data analysis (including computer modeling). document preparation (such as conceptual design or feasibility studies, analytical energy supply

205

PROJECT TITLE: EECBG u.s. DEPARIIIIENI OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

Plano Plano PROJECT TITLE: EECBG u.s. DEPARIIIIENI OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DEIERlIlINAIION Page 1 of2 STATE: TX Funding Opportunity ADDoum::tmtnt Number PrO(urtment Instrument Number NEPA Control Number em Numbu DE·FQA-OOOOQ13 DE-EE0000969 0 Based on my review orlbe information concuning the proposed action, as N[PA Compliance Officer (authorized under DOE Order 4SI.IA), I bave made the rollowing ddtnnination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits). data analysis (including computer modeling). document preparation (such as conceptual deSign or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

206

www.arts.canterbury.ac.nz/internships Project Title: Health, History and Digital  

E-Print Network [OSTI]

project on the history of unfree labour in the Pacific. The intern will link the database to other onlinewww.arts.canterbury.ac.nz/internships Project Title: Health, History and Digital Humanities: The project explores the health history of indentured labourers in Fiji. The intern will digitise microfilm

Hickman, Mark

207

Title: CEL Solar Photovoltaic Power Project in El Salvador Principal Investigator: Abbas Ghassemi  

E-Print Network [OSTI]

Title: CEL Solar Photovoltaic Power Project in El Salvador Principal Investigator: Abbas Ghassemi solar resource, studying different technology options, anticipating performance, and evaluating the economics of the solar power technologies. The NMSU team is evaluating the potential environmental impacts

Johnson, Eric E.

208

Department of Industrial Engineering Spring 2010 Project Title: Angel Wings Bicycle Seat  

E-Print Network [OSTI]

PENNSTATE Department of Industrial Engineering Spring 2010 Project Title: Angel Wings Bicycle Seat Overview The Angel Wings Bicycle Seat is the only two padded bike seat that moves with rides with the rider

Demirel, Melik C.

209

Title I design summary report, initial tank retrieval systems, project W-211  

SciTech Connect (OSTI)

This document provides the Title I (preliminary) design for the Tank 241-SY-101 (101-SY) retrieval system. The design reflects an integrated retrieval approach for 101-SY, whereby the existing mitigation pump will be used to mix the waste and Project W-211 will provide for waste removal. The Title I Design Summary Report includes narrative and sketches that describe the technical aspect of the project, as well as updated cost and schedule baselines for the 101-SY retrieval system.

Rieck, C.A.

1995-03-01T23:59:59.000Z

210

The following National Sea Grant aquaculture research projects were awarded in FY2010-Program Investigator Investigator Affiliation Project Title  

E-Print Network [OSTI]

The following National Sea Grant aquaculture research projects were awarded in FY2010- 2011: Sea Grant College Program Investigator Investigator Affiliation Project Title FY 10-11 Federal Share* Alaska Sea Grant Eckert University of Alaska Fairbanks Red King Crab Aquaculture in Alaska - Release

211

u.s. DEPARTMENT OF ENERGY EERE PROJECT MA,'lAGEMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

'lAGEMENT CENTER 'lAGEMENT CENTER NEPA DETERMINATION RECIPIENT:WL Gore and Associates Page 1 of2 STATE: MD PROJECT TITLE: Manufacturing of low Cost, Durable Membrane Electrode Assemblies for Rapid Conditioning Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number DE-PS.()7G097012 G018052 GFO-1Q..383 G018052 Based on my review of the information (oncerRing tbe proposed action, as NEPA Compliance Officer (.uthori ... .ed under DOE Order4SI.IA), I bave made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 3.6 Siting, construction (or modification), operation, and decommissioning of facilities for indoor bench-scale research projects and oonventJonallaboratory operations (for example, preparation of dlerlllcal standards and sample analYSIS);

212

HQ State HQ City Name of Primary Selectee Project Type Project Title and Brief Project Description  

Broader source: Energy.gov (indexed) [DOE]

Total Project Value Total Project Value Including Cost Share AZ Fort Defiance Navajo Tribal Utility Authority Company Smart Grid Workforce Training (Topic B) Navajo Tribal Utility Authority Smart Grid Workforce Training Program - Develop a workforce that is well-trained and committed to the mission of modernizing NTUA's distribution services, including an expeditious and well- built smart grid system. The training program is designed to maximize employment opportunities for citizens of the Navajo Nation located on the reservation. Arizona New Mexico $704,486 $1,408,971 $704,486 $1,408,971 Glendale Glendale Community College Developing and Enhancing Workforce Training Programs (Topic A) Southern California Utility Initiative - Expand training curricula and programs in the Southern California region. The project will raise awareness and

213

Title of Project: Scoping Data Access and Integration Needs to Facilitate Better Management of Research Innovation  

E-Print Network [OSTI]

Title of Project: Scoping Data Access and Integration Needs to Facilitate Better Management-Madison Participants: P.S. Sriraj, Paul Metaxatos, Piyushimita (Vonu) Thakuriah Status: Active Objective: This project of the intended use and value of these databases. 3. Identify existing access procedures to WisDOT databases

Illinois at Chicago, University of

214

Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests: landscape patterns and the  

E-Print Network [OSTI]

Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests@uwyo.edu William H. Romme Colorado State University Dept. of Forest, Rangeland, and Watershed Stewardship, Fort-Kind and Financial Contributions: $242,868 Abstract: Our project addresses Task 1 in AFP 2006-2. Wildfire and bark

Turner, Monica G.

215

Project Title: Complete System-Level Efficient and Interoperable...  

Office of Environmental Management (EM)

and architecture since a microgrid will be likely upgraded from an existing system. 2014 Smart Grid R&D Program Peer Review Project Summary 2 2014 Smart Grid R&D Program Peer...

216

Project Title: SPANA A Multimedia Tool for Learning Speech Analysis  

E-Print Network [OSTI]

valuable advice on programming techniques and useful materials on handling this project. He also took care crossing measurements, a diagram with both average energy and zero crossing rate of the speech signal

Mak, Man-Wai

217

u.s. DEPARTMENT OF ENERGY EERE PROJECT MA..\IAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

IAGEMENT CENTER IAGEMENT CENTER NEPA DE1'ElUIllNATION RECIPIENT: Prolec fuel Management STATE: FL PROJECT TITLE: flash Foods Job Creation and Petroleum Independence for higher ethanol blends Page 1 of2 Funding Opportunity Announce-ment Number Procuremenlln$lrument Number NEPA Control Number CID Number DE-FOA-OOOOO12S DE-EEOOO3053 GFO-OOO3053-005 0 Based on my review orlhe information concerning the proposed aClion, as NEPA Compliance Officer (authorized under DOE Order 45LIA).1 have made the (ollowlng determination: ex, EA, [IS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

218

u.s. DEPARTMENT OF ENERGY EERE PROJECT MA,'MGEMENT CENTER NEPADETEru.llNATION  

Broader source: Energy.gov (indexed) [DOE]

'MGEMENT CENTER 'MGEMENT CENTER NEPADETEru.llNATION RECIPIENT: lnstitute for Sustainable Communities PROJECT TITLE : Intemationallndustrial Energy Efficiency Training and Deployment (lIEETD) Page 1 of2 STATE: VT Funding Opportunity Announcement Number PNKunment Instrument Number NEPA Control Number CID Number DE-FOA-OOOO531 OE-EEOOO5305 GF0-0005305-001 0 Based on my review of tbe information concerning tbe proposed action, as NEPA Compliance Officer (autborized undel'" DOE Order 4S1.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including , but not limited to, literature surveys, inventories, audits). data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies. analytical energy supply

219

HQ State HQ City Name of Primary Selectee Project Type Project Title and Brief Project Description  

Broader source: Energy.gov (indexed) [DOE]

Participant Participant Share Total Project Value Including Cost Share AZ Fort Defiance Navajo Tribal Utility Authority Company Smart Grid Workforce Training (Topic B) Navajo Tribal Utility Authority Smart Grid Workforce Training Program - Develop a workforce that is well-trained and committed to the mission of modernizing NTUA's distribution services, including an expeditious and well-built smart grid system. The training program is designed to maximize employment opportunities for citizens of the Navajo Nation located on the reservation. Arizona New Mexico $704,486 $704,486 $1,408,972 $704,486 $704,486 $1,408,972 Glendale Glendale Community College Developing and Enhancing Workforce Training Programs (Topic A) Southern California Utility Initiative - Expand training curricula and

220

TITLE  

Office of Legacy Management (LM)

. . . . . . . . . . . . . . . -, , / AMC 000102 ( Nevada DOE/NV--1106-REV. 1 1 Environmental Restoration Project Subsurface Completion Report for Amchitka Underground Nuclear Test Sites: Long Shot, Milrow, and Cannikin Revision No.: 1 September 2006 Approved for public release: further dissemination unlimited Environmental Restoration Project U.S. Department Of Energy National Nuclear Securlty Administration Nevada Sile OMW i - Available for public sale, in p a p from: U.S. Department of Commerce National Technical Information Service 5285 Poa Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Ernail: prdtr$@ntis.gov Online ordering: htto:/hvww.n~~.~ov/ordenn~.htm Available electronically at htt~://www.osti.rov/hrid~e Available for a processing fee to U.S. Department of Energy and its contractors,

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

TITLE  

Office of Legacy Management (LM)

CULTURAL RESOURCES STUDY CULTURAL RESOURCES STUDY BACKQROUND RESEARCH REPORT Off-NfS Cukural Rasowcmr Studks: Background Research for Project Shot11 Prepared by Maureen King Alvin R. McLane and William Gray Johnson MAY 1993 DESERT RESEARCH INSTITUTE CULTURAL RESOURCES STUDY BACKGROUND RESEARCH REPORT Off-NTS Cultural Resources Studies: Background Research for Project Shoal Prepared by Maureen King Alvin R. McLane and William Gray Johnson Prepared for the U.S. Department of Energy Nevada Field Office Las Vegas, Nevada This document is UNCLASSIFIED Derivative , , ::/>.: ; , . / I : Classifier - & ? " A . + - = / . /.. Desert Research Institute ate.:^^:,'& MAY 1993 The work upon which this report is based was supporred by the U.S. Department of h e r g y under Contract #DE-AC08-90NV10845

222

title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 21, 2003 April 21, 2003 April 21, 2003 Bakul Banerjee Bakul Banerjee Project Engineer Project Engineer MOU/SOW MOU/SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW contains work for three engineers. contains work for three engineers. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Caltech FY03 SOW and MOU will be modified to include T2 Caltech FY03 SOW and MOU will be modified to include T2 operations work after UCSD and UFL MOUs are approved. operations work after UCSD and UFL MOUs are approved. UCDavis UCDavis FY03SOW was signed by Dr. Ko and waiting for FY03SOW was signed by Dr. Ko and waiting for Bauerdick

223

Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Map Site Map Home Publications Software Facilities Links Staff Glazing Materials Chromogenics LowE and Spectrally Selective Deposition Processes Characterization New Materials Advanced Systems Superwindows Integrated Window Systems Gas-Filled Panels Window Properties Infrared Laboratory and Traversing System MoWiTT Window+5 Development Therm Development Film Coefficients Condensation Resistance Comfort Models Field Measurements LBNL Role in NFRC Optics Database Daylighting IEA Task 21 Lightshelves/Lightpipes Tools for Daylighting Prediction Demonstrations Daylighting Controls Residential Performance Energy Star ResFen Development ECW Demonstrations Annual Energy Rating Field Tests and Monitoring Projects

224

TITLE  

Office of Legacy Management (LM)

2 Velma Avenue 2 Velma Avenue Columbus, 0h.o 4321 1-2497 6141297-2300 Fax: 297-241 1 OH I 0 HISTORICAL SOCIETY SlSCE 1885 February 23, 1996 David G. Adler, Site Manager F o m r Sites Restoration Division Department of Energy Oak Ridge Operations Office P.O. 80x 200T Oak Ridge, Tennessee 37831 -8723 Dear Mr. Adler: Re: 8 8 T Metal Building, Columbus, Ohio This is in response to your correspondence, received on February 22, 1996, regarding the project noted above. My staff has reviewed carefully the information provided. Based on the description of the proposed work and photographs provided, it is my opinion that the proposed work, if completed as proposed, will have no effect on the integrity of the B 8 T Metal building, which is eligible for the National Register of Historic Places under Criterion C. No further coordination with

225

FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development on the Population Biology  

E-Print Network [OSTI]

Collaborative Abby Arnold, Executive Director, American Wind Wildlife Institute,aarnold@awwi.org, 202- 535-7800 (x105) Taber D. Allison, Director of Research and Evaluation, American Wind Wildlife Institutei FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development

Sandercock, Brett K.

226

Title: Use of Physical Barriers to Prevent Borer Infestation of Apple Burrknots Project Leaders  

E-Print Network [OSTI]

Title: Use of Physical Barriers to Prevent Borer Infestation of Apple Burrknots Project Leaders of burrknot tissue on apple dwarfing rootstocks is an increasing problem throughout the northeast. One into the winter. We also discuss economic considerations. Background and Justification: Apple growers

Agnello, Arthur M.

227

TITLE  

Office of Legacy Management (LM)

Corporare Center Corporare Center f 5 1 Lalayerre Drive P.O. Box 350 Oak Ridge. Tennewt 3783 1.0350 Facsimile: 1 6 1 5 1 220.2 100 ~ o b No. 14501, FUSRAP Project DOE Contract NO. DE-AC05-9 10R2 194 9 Code: 7340/WBS: 135 U.S. Department of Energy Oak Ridge Field Office P . O . BOX 2001 Oak Ridge, Tennessee 37831-8723 Attention: David G. hdler, Site Manager , Former Sites Restoration Division subject: Hazard Assessment for Residual Contaminztion at the Former Associate Aircraft S i t e ' ( P 2 S ) Dear Mr. Adler: Based on sample results obtained a t A4S, uranium-238 concentrations above the site specific criteria (35 pCi/g) were found in a small sub-slab srsa in Section 1 of the former AAS building. The sample results of the location indicated radioactive contamination at a maximum concentration of 134 pci/g. T

228

Project Title: Translating Solanaceae Sequence Diversity and Trait Variation into Applied Outcomes through Integrative Research, Education, and Extension  

E-Print Network [OSTI]

Project Title: Translating Solanaceae Sequence Diversity and Trait Variation into Applied Outcomes. Project Director: David Douches (douchesd@msu.edu), Michigan State University Co-Directors: Robin Buell@hort.oregonstate.edu), Oregon State University Project Website: http://solcap.msu.edu The SolCAP project was initiated September

Douches, David S.

229

Application for CALS-CCE 2013 Summer Internship Title of project: Communicating Climate Change to New Yorkers  

E-Print Network [OSTI]

Application for CALS-CCE 2013 Summer Internship Title of project: Communicating Climate Change County Project summary and intended outcomes (no more than 5-10 sentences): Cornell Climate Change): The intern will support the Cornell climate change project by working to develop outreach materials

Keinan, Alon

230

Project title: Stimulation at Desert Peak and Bradys reservoirs: modeling with the coupled THM code FEHM  

Broader source: Energy.gov [DOE]

Project title: Stimulation at Desert Peak and Bradys reservoirs: modeling with the coupled THM code FEHM presentation at the April 2013 peer review meeting held in Denver, Colorado.

231

NEPA COMPLIANCE SURVEY Project Information Project Title: South Compost Facility #2 Da  

Broader source: Energy.gov (indexed) [DOE]

South Compost Facility #2 Da South Compost Facility #2 Da te: 1-6-10 DOE Code: 6730.020.0000 Contracto r Code: 8067-788 Project Lead: Anthony Bowler Project Ove rview The purpose of the project is to build an additional compos ling facility at RMOTC to allow for 1. Bnef project description [include anything that increased soil remediation capabilities. The project will involve removing the top soil and placing could impact the environment] it adjacent to the operational area ,in a "signed" pile for reclamation . Additional scraping of the 2. Legal location area (6"-8'1 will generate material which will be used to erect a 2' berm around the location to 3. Duration of the project control runon/runoff. A perimeter fence and a locking gate will be installed around the facility's

232

Project Information Form Project Title Strategies for Transitioning to Zero-Emission Vehicles--Freight  

E-Print Network [OSTI]

,884 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates June 1, 2014 � August 15, 2014 Brief Description of Research Project According to the EIA, freight modes accounted for 29% of transportation fuel, not anticipated) Web Links Reports Project website http://ncst.ucdavis.edu/white-paper/ucd-dot-wp3-1b #12;

California at Davis, University of

233

DE-MA0002512  

Broader source: Energy.gov (indexed) [DOE]

Award No. 2. Modification No. 3. Effective Date Award No. 2. Modification No. 3. Effective Date 4. CFDA No. DE-MA0002512 03/27/2012 ASSISTANCE AGREEMENT 7. Period of Performance 6. Sponsoring Office 5. Awarded To Other Cooperative Agreement Grant test 10. Purchase Request or Funding Document No. 9. Authority 8. Type of Agreement 11. Remittance Address 12. Total Amount 13. Funds Obligated Govt. Share: $0.00 Cost Share : $0.00 Total : $0.00 This action: $0.00 Total : $0.00 test 14. Principal Investigator 15. Program Manager 16. Administrator test 19. Submit Reports To 18. Paying Office 17. Submit Payment Requests To 20. Accounting and Appropriation Data See Schedule 21. Research Title and/or Description of Project For the Recipient For the United States of America 22. Signature of Person Authorized to Sign

234

NEPA COMPLIANCE SURVEY Project Information Project Title: T-2-33  

Broader source: Energy.gov (indexed) [DOE]

2-33 2-33 Date: 12-22-2010 DOE Code: Contractor Code: Project Lead: Bernard Winfree Project Overview 1. What are the environmental The existing manifold building will be moved off site. A backhoe will be used to dig up the manifold piping, impacts? after all possible fluids have been sucked out. Wells 88-ax-28, 17 -stx-27 and 18-stx-27 will be tied directly into the tank The remaining pipes will be cut off at the lowest point. At this time, a compos it sample of the 2. What is the legal location? surrounding soil soil will be taken . Any contaiminated soils will be hauled to the compost facility. When the 3. What is the duration of the project? samples come back under the established limits, the hole will be backfilled with native materials and the site

235

NEPA COMPLIANCE SURVEY Project Information Project Title: T-1-21 Restoration  

Broader source: Energy.gov (indexed) [DOE]

1-21 Restoration 1-21 Restoration Date: 12-22-2010 DOE Code: Contractor Code: Project Lead : Bernard Winfree Project Overview 1. What are the environmental The existing building will be removed from the site. A backhoe will be used to dig up the manifold piping, impacts? after all possible fluids have been sucked out of the piping. We will then cut off the pipes at the lowest 2. What is the legal location? possible point At this time a com posit soil sample will be taken of the area. When the samples come back under the established limits, we will backfill the hole with the existing materials and recontour the site to 3. What is the duration of the project? perexisting conditions. Reseeding will be initiated when the proper seed mix is established. This is an

236

RECIPIENT:NREL PROJECT TITLE: ESIF Excavation Soil Stockpile; NREL Tracking No. 11-013  

Broader source: Energy.gov (indexed) [DOE]

PROJECT PROJECT TITLE: ESIF Excavation Soil Stockpile; NREL Tracking No. 11-013 Page 1 of2 **...*... @-~ .. @ '"',. .. ~ STATE: CO Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number NREL-11-013 GOO Based on my review ufthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: DOE/EA· Final Supplement-II to Final Site-Wide Environmental Assessment of the National Renewable Energy Laboratory's 1440·5·11 (NREL) South Table Mountain Complex (November 2009) DOE/EA· Final Site-Site Wide Environmental Assessment of the National Renewable Energy Laboratory's (NREL) South

237

U.S. DEPARTMENT OF ENERGY EERE PROJECT MA.'IAGEMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

'IAGEMENT CENTER 'IAGEMENT CENTER NEPA DETERMINATION REel PI ENT:lllinois Department of Military Affairs PROJECf TITLE: Geothermal Retrofit of ILARNG HQ Building Page 1 of2 STATE: IL fo' unding Opportunity Announcement Number ProcurementlnSfrument Number NEPA Control Number CID Number DE-FOA-QOOO116 DE-EEOOO3002 GF().1o.224 G03002 Based on my review orlhe information concerning the proposed action, as NEPA Compliance Omcer (authorized under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathenng (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparatJon (such as conceptual design or feasibility studies, analytical energy supply

238

Final Project Report for project titled "Fluoroalkylphosphonic-acid-based proton conductors"  

SciTech Connect (OSTI)

The overall objective of this research was to create new proton-conducting polymer electrolytes for use in energy conversion devices including hydrogen fuel cells that could operate at high temperatures (95-130 C) and under low relative humidity (< 50% RH) conditions. The new polymers were based on the fluoroalkylphosphonic and phosphinic acid (FPA) groups (see illustration below) which offer prospects for rapid proton transport by a proton-hopping mechanism similar to that which operates in phosphoric acid, a well-known proton-transporting electrolyte that is used in a class of hydrogen fuel cells that work well under the conditions noted above and are already commercially successful. The two specific project objectives were as follows: (1) synthesize and characterize new proton-conducting electrolytes based on the fluoroalkylphosphonic and phosphinic acid (FPA) functional groups; and (2) create and apply new computer models to study protonic conduction in FPA-based electrolytes. The project was successful in creating the desired polymer electrolytes and also a series of molecular model compounds which were used to study proton transport in FPA electrolytes in general. Computer models were created to study both structure and proton-transport dynamics in the electrolytes, particularly the molecular model compounds. Rapid proton transport by a hopping mechanism was found in many of the model compounds and correlations with transport rates with molecular structure were identified. Several polymeric analogs of FPA model compounds were prepared and studied, however FPA-based polymeric materials having very high protonic conductivities under either wet or dry conditions were not obtained. Several possible reasons for the failure of polymeric materials to exhibit the expected high protonic conductivities were identified, including a failure of the polymers to adopt the phase-separated secondary structure/morphology necessary for high proton conductivity, and an unexpected polymer crosslinking effect of acidic groups having two P-OH groups. The project has lent insight into how FPA groups transport protons in both liquid and polymeric forms, which provides guidance to future efforts to design and prepare future generations of proton-conducting polymer electrolytes for hydrogen fuel cells and other types of electrochemical energy conversion and storage devices.

Stephen Creager

2011-12-08T23:59:59.000Z

239

RECIPIENT:City of Ann Arbor PROJECT TITLE: Ann Arbor Wind Generator  

Broader source: Energy.gov (indexed) [DOE]

Ann Arbor Ann Arbor PROJECT TITLE: Ann Arbor Wind Generator " ) STATE: MI Funding Opportunity Announcement Number ProcurementInstrument Number NEPA Control Number CID Number DE-EE0000447 GFO-0000447-001 0 Based on my review oCthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution; and

240

Program or Field Office: Project Title and I. D. No.: Locatio  

Broader source: Energy.gov (indexed) [DOE]

D. No.: Locatio n: U.S. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Acid Pond Property Disposition Near the Spook, Wyoming, Disposal Site. LM # 08-12. Spook, Wyoming Proposed Action or Project Description: The Spook disposal site is located in Converse County, Wyoming, about 32 miles north of Glenrock, and is managed as a Title I Uranium Mill Tailings Radiation Control Act site. The Acid Pond Parcel located just southwest of the disposal site, also known as Vicinity Property SK-001 S, is a previously disturbed area once considered part of the original footprint of the Spook site. This parcel is not associated with current disposal site operations. DOE proposes to disposition the 5.89-

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

MA 22100  

E-Print Network [OSTI]

MA 22100 002 - UNIV 017 MWF 08:30am - Smith, Gabriel (MATH 741); MA 22100 003 - UNIV 017 MWF 09:30am - Naughton, Dominic (MATH 848); MA 22100...

242

TITLE XVII Application Process  

Broader source: Energy.gov [DOE]

The Title XVII Innovative Clean Energy Projects (Title XVII) loan program is currently accepting applications in response to open technology-specific solicitations.

243

u.s. DEPARTMENT OF ENERGY EERE PROJECT MA,\lAGEMENT CDITER NFPA DE=nNATION  

Broader source: Energy.gov (indexed) [DOE]

\lAGEMENT CDITER \lAGEMENT CDITER NFPA DE=nNATION RECIPIENT:Cloud County Community College Page I of2 STATE: KS PROJECT TITLE: EECBG State of Kansas DE-EEOOO0727 Cloud County GSHP HVAC Renewable Energy Subgranl Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FDA 0000013 DE-EEOOOO727 .002 0 Based on my ",view orlhe information concerning tbe proposed action, as NEPA Compliance Officer (authoro..ed under DOE Order 451.IA), I have made the (ollowing detennination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories. audits). data analysis (including computer modeling), document preparation (such as oonceplual design or feasibility studies, analytical energy supply

244

2012 EL Project Title and Number: Model-Based Engineering Program Title: Systems Integration for Manufacturing and Construction  

E-Print Network [OSTI]

for Manufacturing and Construction Applications Principal Investigator: Joshua Lubell, 734 Project Staff Name Josh Lubell Robert Lipman Allison Barnard Feeney Simon Frechette Chris Brown Kenway Chen Albert Jones Craig

Perkins, Richard A.

245

Project Title Mobile Device Management. Team Pam Horne, Jolene King, Jim Lehman, Marcus Lill, Terry Schroeder, David Shaw  

E-Print Network [OSTI]

Project Title Mobile Device Management. Team Pam Horne, Jolene King, Jim Lehman, Marcus Lill, Terry and supporting mobile devices that access Purdue data and information. Hypothesis We anticipate there would be several advantages from providing a model of supporting mobile devices. These advantages would be in areas

246

Project Title: Functional Measures of Sea Turtle Hearing ONR Award No: N00014-02-1-0510  

E-Print Network [OSTI]

A t Project Title: Functional Measures of Sea Turtle Hearing ONR Award No: N00014 Moein Bartol Virginia Institute ofMarine Science ABSTRACT In this study, sea turtle hearing and species and physiologically by brainstem evoked potential techniques. Sea turtles employed in this work

247

IMPEE PhD Opportunity Project title: Cyber-physical Systems (CPS) for knowledge discovery, data exploration and human factors  

E-Print Network [OSTI]

IMPEE PhD Opportunity Project title: Cyber-physical Systems (CPS) for knowledge discovery, data exploration and human factors research Supervisor(s): T. Lim, J.M. Ritchie Abstract CPS is an engineering/augmented/mixed reality spaces. R&D interests include (but not limited to): Aural or narrative guidance for product design

Greenaway, Alan

248

Project Year Project Title  

E-Print Network [OSTI]

-friendly visualization tools, such as Google Sketchup, do not enable structural analysis. This makes it extremely

Gray, Jeffrey J.

249

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

MA-1 MA-1 Office of Scheduling MA-10 February 3, 2011 Ingrid Kolb, Director Laurie Morman, Chief of Staff MA-40 MA-30 MA-90 Office of Aviation Management Office of Administration Office of Engineering & Construction Management MA-50 Office of Procurement & Assistance Management MA-60 Office of Executive Secretariat MA-70 Office of Information Resources Anthony Rediger,Director Glen Wattman, Director Brian Costlow, Director Paul Bosco, Director Vacant, Director Kevin Hagerty, Director Office of Headquarters Safety, Health and Security MA-41 MA-43 MA-42 Office of Administrative Management and Support Office of Logistics and Facility Operations Deputy Director for Facilities Management Deputy Director for Project Management Rebecca Montoya, Dep. Director Office of Procurement

250

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

MA-1 MA-1 Office of Scheduling MA-10 February 3, 2011 Ingrid Kolb, Director Laurie Morman, Chief of Staff MA-40 MA-30 MA-90 Office of Aviation Management Office of Administration Office of Engineering & Construction Management MA-50 Office of Procurement & Assistance Management MA-60 Office of Executive Secretariat MA-70 Office of Information Resources Anthony Rediger,Director Glen Wattman, Director Brian Costlow, Director Paul Bosco, Director Vacant, Director Kevin Hagerty, Director Office of Headquarters Safety, Health and Security MA-41 MA-43 MA-42 Office of Administrative Management and Support Office of Logistics and Facility Operations Deputy Director for Facilities Management Deputy Director for Project Management Rebecca Montoya, Dep. Director Office of Procurement

251

MA 16100  

E-Print Network [OSTI]

MA 16100, Fall 2014. Plane Analytic Geometry And Calculus I. Course Info. Syllabus Emergency Preparedness Syllabus Attachment Course Calendar...

252

NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company -  

Broader source: Energy.gov (indexed) [DOE]

10 Number: 10 Number: NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company - Cleanup Actions, December 2012 to December 2013 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions. e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation Company (PRC) will be conducting cleanup actions on the Hanford Site in accordance with the categorical exclusion (CX) referenced in 10 CFR 1021, B, CX B6.1 ''Cleanup actions". PRC Projects include all those identified Sections . 3 and J.l4 of the PRC Contract, DE-AC06-08RL14788. Small-scale, short-term cleanup actions, under RCRA, Atomic Energy Act, or other

253

Project Title: Carbon cycling at the landscape scale: the effect of changes in climate and fire frequency on age distribution, stand structure, and net ecosystem production.  

E-Print Network [OSTI]

Project Title: Carbon cycling at the landscape scale: the effect of changes in climate and fire: Our project addresses Task 1 in RFP 2003-1. Climate, fire (frequency and intensity), and forest@mhub.zoology.wisc.edu, 4 Tinker@uwyo.edu Duration of Project: 3 years Annual Funding Requested from the Joint Fire Science

Turner, Monica G.

254

PROJECT TITLE: Evaluation of Seed Boot and Furrow Opener Configurations for Optimizing Seed and Fertilizer Placement in Simultaneous, Single-Pass Operations with Air Drills under  

E-Print Network [OSTI]

Hr GRC 3 PROJECT TITLE: Evaluation of Seed Boot and Furrow Opener Configurations for Optimizing-seeded into spring wheat stubble at Havre in 2002 is presented in Table 1. The `Morris Gumbo Boot' was included

Maxwell, Bruce D.

255

PI Research Organisation Project Title NE/J024678/1 Dr Christopher Davis University of Reading Driving space weather forecasts with real data  

E-Print Network [OSTI]

Lead Grant Reference PI Research Organisation Project Title NE/J024678/1 Dr Christopher Davis Troposphere and the Routing of Aircraft (EXTRA)Professor Keith Shine University of Reading NE/J023760

256

MA 26100  

E-Print Network [OSTI]

Differential calculus of several variables; multiple integrals. Introduction to vector calculus. Not open to students with credit in MA 174 or 271. Typically offered...

257

MA 221  

E-Print Network [OSTI]

MA 22100-22200 is a two-semester sequence in the technique of calculus for students enrolled in certain technical curricula. Not available for credit toward...

258

MA 222  

E-Print Network [OSTI]

MA 222, Spring 2008. Calculus For Technology II ... Contact the Webmaster for technical and content concerns about this webpage. Copyright 2010, Purdue...

259

MA 30300  

E-Print Network [OSTI]

Course Description. Credit Hours: 3.00. This is a methods course for juniors in any branch of engineering and science, designed to follow MA 262.

260

No Slide Title | Department of Energy  

Energy Savers [EERE]

No Slide Title No Slide Title No Slide Title More Documents & Publications Slide 1 Earned Value Management System (EVMS) and Project Analysis Standard Operating Procedure (EPASOP)-...

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Long-Term Surveillance Plan for the Sherwood Project (UMTRCA Title II) Reclamation Cell, Wellpinit, Washington, February 2001  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Maintenance Program and Maintenance Program Long-Term Surveillance Plan for the DOE Sherwood Project (UMTRCA Title II) Reclamation Cell Wellpinit, Washington February 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC 01-06 Document Number S00204 DOE/Grand Junction Office Sherwood LTSP February 2001 Page iii Contents 1.0 Introduction............................................................................................................... 1-1 1.1 Purpose ..................................................................................................................... 1-1 1.2 Legal and Regulatory Requirements ........................................................................

262

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Are non-marine organic-rich shales suitable exploration targets?  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Are non-marine organic-rich shales suitable exploration targets? (EARTH-15-SR2) Host institution: University of Oxford Supervisor 1: Stuart Robinson Supervisor 2: Steve Hesselbo (University of Exeter) Project description: Shales

Henderson, Gideon

263

Project title: Phylogenetic Analysis of "New" Homeobox in the lineage leading to Humans Thehomebox genes are extremely interesting and central in the mechanisms establishing form in  

E-Print Network [OSTI]

Project title: Phylogenetic Analysis of "New" Homeobox in the lineage leading to Humans Thehomebox and challenging questions in case of fast initial progress. The core project will involve comparative genome these genes evolutionary. Peter Holland group has found 4 new genes in humans, by comparison to the mouse

Goldschmidt, Christina

264

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Evaluating the resilience of deepwater systems to recover from oil spills  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Evaluating the resilience of deepwater systems to recover from oil spills Host institution: Heriot-Watt University Gatliff (BGS), Jeffrey Polton (NOC), Alejandro Gallego and Eileen Bresnan (MSS). Project description: Oil

Henderson, Gideon

265

RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project and Cold War Era Historic District Treatment Plan" (DOERL-97-56); the "Cultural Resources Management Plan" (DOERL-98-10), and other applicable guidance documents and...

266

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project and Cold War Era Historic District Treatment Plan" (DOERL-97-56; the "Cultural Resources Management Plan" (DOERL-98-10, and other applicable guidance documents and...

267

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project and Cold War Era Historic District Treatment Plan" (DOERL-97-56); the "Cultural Resources Management Plan" (DOERL-98-10), and other applicable guidance documents and...

268

Title 16 U.S.C. 1278(a) Restrictions on Water Resources Projects...  

Open Energy Info (EERE)

not grant any license for construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project works under the Federal Power Act on or directly...

269

MA Mortenson | Open Energy Information  

Open Energy Info (EERE)

Mortenson Mortenson Jump to: navigation, search Name MA Mortenson Place Minnesota Zip 55440-0710 Sector Solar, Wind energy Product Construction and building firm active in the installation of wind and solar farms. References MA Mortenson[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. MA Mortenson is a company located in Minnesota . References ↑ "MA Mortenson" Retrieved from "http://en.openei.org/w/index.php?title=MA_Mortenson&oldid=348551" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

270

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: Energy.gov (indexed) [DOE]

2, Rev 1 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2014 II. Project...

271

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2015. II. Project...

272

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2014 II. Project Description...

273

RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: Energy.gov (indexed) [DOE]

7, Rev 1 MSA Annual Categorical Exclusion for Disconnection of Utilities under 10 CFR 1021, Subpart D, Appendix B, B1.27 for Calendar Year 2014 II. Project Description and Location...

274

RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 MSA Annual Categorical Exclusion for Disconnection of Utilities under 10 CFR 1021, Subpart D, Appendix B, B1.27 for Calendar Year 2015. II. Project Description and Location...

275

Project Title: Air Quality Monitoring in the Coastal Environment of Miami Professor's name: Xinrong Ren________________________________________ ______ _  

E-Print Network [OSTI]

on the campus of the Rosenstiel School of Marine and Atmospheric Science. Atmospheric pollutants include ozone in this project will learn basic knowledge of atmospheric science and air pollution, operate some environmental Ren________________________________________ ______ _ Department: Marine and Atmospheric Chemistry

Miami, University of

276

Awards Received in October 2006 Principal Investigator Department Sponsor Project Title Amount GCO OSP Number  

E-Print Network [OSTI]

OSP Number ABRUNA, HECTOR D DISALVO, FRANCIS J CCMR DOE AN ADVANCED MATERIALS APPROACH TO FUEL CELL RESEARCH PROJECT $33,025 THF 52476 BELL, JAMES F CRSR NASA (GODDARD SFC) COMPOSITION AND WEATHERING HISTORY

Danforth, Bryan Nicholas

277

MA Org Chart, August 01, 2013  

Broader source: Energy.gov (indexed) [DOE]

MA-1 MA-1 Ingrid Kolb, Director Chief Acquisition Officer (Vacant) Laurie Morman, Chief of Staff Office of Resource Management and Planning MA-1.1 Marilyn Dillon, Director Willie Mae Ingram, Dep. Director (Acting) Office of Acquisition & Project Management Paul Bosco, Director David Boyd, Dep. Director Jay Glascock, Senior Advisor Office of Policy MA-63 Berta Schreiber Director Office of Contract Management Patrick Ferraro Director Office of Project Management Michael Peek Director Office of Headquarters Procurement Services Mark Brady Director Office of Property Management Carmelo Melendez Director MA-60 Office of Scheduling and Advance Anthony Rediger, Director James Covey, Dep. Director MA-10 MA-30 MA-40 MA-70 MA-90 Office of Aviation

278

Awards Received in March 2010 Principal Investigator Department Sponsor Project Title Amount GCO OSP Number  

E-Print Network [OSTI]

FOR VISUAL REALISM IN SCALE-COMPLEX SCENES 98,337. MBF 51958 BARBASCH, DAN MATH NSF UNIPOTENT REPRESENTATIONS B SEELEY, ROBIN WEEKS, HAROLD JOHN SHOALS NSF (NSF BIO) UPGRADE OF SANITATION AND COMMUNICATION, JAMES M NAIC NSF A TECHNOLOGY DEVELOPMENT PROJECT FOR THE LARGE-N / SMALL-D SQUARE KILOMETER ARRAY

Danforth, Bryan Nicholas

279

Year Project Title USGS contact(s) Published paper, data source,  

E-Print Network [OSTI]

information Keywords 1 2003-present Delineation of brine contamination in and near the East Poplar oil field_poplar/index.html Project assesses brine contamination to the shallow aquifers and surface water. Energy Development, Williston Basin, Brine contamination, Groundwater, Surface Water, East Poplar oil field, Fort Peck Indian

Torgersen, Christian

280

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

51 Rev. l 51 Rev. l Washington River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Under CX 81.28, "Placing a Facility in an Environmentally Safe Condition" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will place facilities in a cold, dark, and environmentally safe condition during Calendar Year 2013. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & 8 to Subpart D, & CX 81.28. WRPS' facilities include all those identified in

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

93 Rev 0 93 Rev 0 River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Under CX B5.6, "Oil Spill Cleanup" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform actions to remove and cleanup oil and related contaminated materials recovered during oil spill cleanup operations during Calendar Year 2013. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & ex B5.6. WRPS' facilities include all those identified in the Tank Operations Contract

282

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

38, Rev 1 38, Rev 1 MSA Annual Categorical Exclusion for Electronic Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.7 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform acquisition, installation, operation, modification, and removal of electricity transmission control and monitoring devices, communication systems, data processing equipment, and similar electronic equipment. Activities include, but are not limited to, install fiber optic cable between and within existing buildings; install new conduit and/or replace old conduit; minor

283

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

2, Rev 0 2, Rev 0 MSA Annual Categorical Exclusion for Facility Safety and Environmental Improvements under 10 CFR 1021, Subpart D, Appendix B, B2.5 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform safety and environmental improvements of a facility (including, but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed. Improvements include, but are not limited to, replacement/

284

RL-721 REV3 I. Project Title: NEPA REVIEW SCREENING FORM  

Broader source: Energy.gov (indexed) [DOE]

10 Number: 10 Number: DOE/CX-00051 Washington River Protection Solutions LLC - Proposed Actions For CY 2012 Scheduled To Take Place Onder CX B1.28, "Placing a Facility in an Environmentally Safe Condition" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, etc.): Washington River Protection Solutions LLC (WRPS) will place facilities in a cold, dark, and environmentally safe condition on & near the Hanford Site during Calendar Year 2012. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & CX B1.28. WRPS' facilities

285

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

48 Rev. 1 48 Rev. 1 Washington River Protection Solutions LLC -Proposed Actions For CY 2013 Scheduled To Take Place Under CX B1.3, "Routine Maintenance" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform routine maintenance services on buildings, structures, infrastructure and equipment during Calendar Year 2013. WRPS will perform all routine maintenance activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, and CX B1.3. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.13

286

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

3, Rev 0 3, Rev 0 MSA Annual Categorical Exclusion for Site Characterization and Environmental Monitoring under 10 CFR 1021, Subpart D, Appendix B, B3.1 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform site characterization and environmental monitoring (including siting, construction, modification, operation, dismantlement, and removal of equipment). Activities would be near-surface, shallow, and in previously disturbed or developed areas; designed to conform with applicable requirements and use best management practices to limit the effects of any resultant ground disturbance.

287

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

7 Rev 0 7 Rev 0 Washington River Protection Solutions LLC Place Under CX 86.1, "Cleanup Actions" Proposed Actions For CY 2013 Scheduled To Take 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions- e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform small-scale, short-term cleanup actions, costing ten million or less, under the Resource Conservation & Recovery Act (RCRA), Atomic Energy Act, or other authorities as necessary to reduce risk to human health or the environment from a release or threat of release of a hazardous substance of than high-level radioactive waste and spent nuclear fuel during Calendar Year 2013. WRPS

288

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

62 Rev. 1 62 Rev. 1 Washington River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Onder CX B5.1, "Actions to Conserve Energy or Water" 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform actions to conserve energy or water during Calendar Year 2013. WRPS will perform all activities in accordance with the cal exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & CX 85.1. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.l3 and J.l4. Activities would include, but are not limited to:

289

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

47, Rev 1 47, Rev 1 MSA Annual Categorical Exclusion for Transfer Actions under 10 CFR 1021, Subpart D, Appendix B, Bl.30 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform transfer actions, where the predominant activity is transportation, and where the receipt and storage capacity and management capability for the amount and type of materials, equipment, or waste to be moved already exists at the receiving site; and all necessary facilities and operations at the receiving site are already permitted, licensed, or approved, as appropriate. Transfers may

290

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

87 87 CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring, December 2012 to December 2013 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions- e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation (PRC) will be conducting site characterization and environmental monitoring on the Han Site in accordance with the categorical exclusion (CX) referenced in 10 CFR 102 , Appendix B, CX 83.1, ''Site characterization and environmental monitoring''. PRC ects include all those identified Sections J.l3 and J.l4 of the PRC Contract, DE-AC06-0 RL14788. Site characterization and environmental monitoring (including, but not limited to, siting,

291

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

5 5 Washington River Protection Solutions LLC - Renovation of 274-AW Under CX B2.l, "Workplace Enhancements" 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will renovate the 274-AW building. The 274-AW building is a 10-wide modular building located in the 200 East Area near the 241-AW and 241-AP Tank Farms. It was installed in 1993 by Eric R. Brown Construction, Inc. as a support facility for 272-AW. The facility currently serves as an office for WRPS' Base Operations managers and engineers. 274-AW is centrally located and easily accessible,

292

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

11, Rev 0 11, Rev 0 MSA Annual Categorical Exclusion for Routine Maintenance and Custodial Services under 10 CFR 1021, Subpart D, Appendix B, Bl.3 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform routine maintenance and custodial services on Hanford buildings, structures, infrastructures, and equipment in previously disturbed and developed areas. Routine maintenance and custodial services include those in MSA contract DE-AC06-09RL14728, Attachment J.3. Buildings, structures, infrastructures, and equipment subject to routine maintenance and custodial services

293

Pacific Northwest Region MAPS dataset retrospective analysis Project Title: USFS Region Six MAPS Dataset Re-analysis for the Development of Management  

E-Print Network [OSTI]

Pacific Northwest Region MAPS dataset ­ retrospective analysis Project Title: USFS Region Six MAPS Dataset Re-analysis for the Development of Management and Climate Change Support Tools for Landbird) demographic dataset may reveal how predicted patterns of climate-related forest fragmentation, pest outbreak

DeSante, David F.

294

Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests: landscape patterns and the risk of high-severity fire.  

E-Print Network [OSTI]

1 Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests of Wisconsin, Madison, WI Dr. William H. Romme, Colorado State University, Fort Collins, CO Dr. Philip A.firescience.gov #12;2 ABSTRACT The interactions of wildfire and bark beetle outbreaks and their reciprocal influences

Turner, Monica G.

295

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Environmental assessment of deep-water sponge fields in relation to oil and gas  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Environmental assessment of deep-water sponge fields in relation to oil and gas activity: a west of Shetland case study industry and government identified sponge grounds in areas of interest to the oil and gas sector

Henderson, Gideon

296

UK Oil and Gas Collaborative Doctoral Training Centre (2015 start) Project Title: Exploring the petroleum potential of a frontier province: Cretaceous stratigraphy and  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2015 start) Project Title: Exploring Myanmar. It has been shown that gas and oil exists in the basin and that a considerable unconventional biogenic gas system exists in the deep-waters offshore. The sediments of the Rakhine Basin were deposited

Henderson, Gideon

297

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Quantifying the role of groundwater in hydrocarbon systems using noble gas  

E-Print Network [OSTI]

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Quantifying the role of groundwater in hydrocarbon systems using noble gas isotopes (EARTH-15-CB1) Host institution biodegradation of oil can remove its value ­ but what controls the biodegradation? The deep biosphere plays a key

Henderson, Gideon

298

Program or Field Office: Project Title and I.D. No.:  

Broader source: Energy.gov (indexed) [DOE]

D. No.: D. No.: u.s. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Routine Maintenance Activities at th e Grand Junction, Colorado, Calibration Model Facility. LM # 42-11. Location: Grand Junction , Colorado Proposed Action or Project Description: DOE proposes to conduct routine maintenance actions as needed at a facility containing calibration borehole test pits. The facility is located just behind the U.S. Department of Energy Grand Junction Office Site on land leased from the Riverview Technology Corporation . Property adjacent to the east side of the facility is owned by the Union Pacific Railroad; east of that is a City of Grand Junction municipal cemetery. Renewal of the lease generally occurs every 5 years

299

Manhattan Project: A Tentative Decision to Build the Bomb<!--Include title  

Office of Scientific and Technical Information (OSTI)

President Franklin Roosevelt's note to Vannevar Bush giving Bush the tentative go-ahead to build the atomic bomb. A TENTATIVE DECISION TO BUILD THE BOMB President Franklin Roosevelt's note to Vannevar Bush giving Bush the tentative go-ahead to build the atomic bomb. A TENTATIVE DECISION TO BUILD THE BOMB Washington, D.C.(1941-1942) Events > Early Government Support, 1939-1942 Einstein's Letter, 1939 Early Uranium Research, 1939-1941 Piles and Plutonium, 1939-1941 Reorganization and Acceleration, 1940-1941 The MAUD Report, 1941 A Tentative Decision to Build the Bomb, 1941-1942 Vannevar Bush moved swiftly to take advantage of the positive MAUD Report. Without waiting for Arthur Compton's latest committee to finish its work confirming the MAUD Committee's conclusions, Bush on October 9, 1941, met with President Franklin D. Roosevelt and Vice President Henry A. Wallace (who had been briefed on uranium research in July). Bush summarized the British findings, discussed cost and duration of a bomb project, and emphasized the uncertainty of the situation. He also received the President's permission to explore construction needs with the Army. Roosevelt instructed him to move as quickly as possible but not to go beyond research and development. Bush, then, was to find out if a bomb could be built and at what cost but not to proceed to the production stage without further presidential authorization. Roosevelt indicated that he could find a way to finance the project and asked Bush to draft a letter so that the British government could be approached "at the top.

300

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

9 9 Status Update: EPAct 2005 Title IX, Subtitle J Section 999 - Project NT42677, "Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Program Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 UDAC Update Presentation Outline * Consortium Accomplishments * UDW Program RFP Summary - 2007 - 2008 * 2009 Funding Disbursement History * 2009 Program / Process Enhancements - Contractual / GAO - Risk Mitigation / Management 3 Overall: * 3 Annual Plans completed * 15 solicitations released under 2007 R&D funding * 43 projects selected for award under 2007 solicitations - 17 Ultra-Deepwater projects - 19 Unconventional Resources projects - 7 Small Producers projects Program Accomplishments Solicitations & Awards 4 * Current Status:

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

MA.2  

Office of Legacy Management (LM)

IS .:,I. ;' IS .:,I. ;' MA.2 0 y-AU Mr. M ichael Matt W a tertown Redevelopment Authority 319 Arlington Street W a tertown, Massachusetts 02172 Dear Mr. Matt: The Department of Energy is evaluating the radiological condition of sites that were utilized under the Manhattan Engineer District and/or the Atomic Energy C o m m ission in the early years of nuclear energy development to determine whether they need remedial action and whether the Department has authority to perform such action. As you know from information previously sent to you, portions of the W a tertown Arsenal in W a tertown, Massachusetts, were identified as possible sites. The areas investigated included those areas which were the sites of Buildings 34, 41, and 421 and the GSA site. The enclosed documents, which represent the Department's review of the

302

Tammy Ma  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

step toward ignition or alpha heating (where the fusion reactions start to become self-sustaining) or another mission-based project. Together, we'll come up with an idea for an...

303

Project Title:__________________________________________________________________ Proposal #: _____________  

E-Print Network [OSTI]

#: _____________ Company Name: Name on Card: Mailing Address: Email: Telephone: FAX: Credit Card Type: Credit Card #, and the funding expiration date. NanoFab Payment Form Dollar Amount: Exp. Date mm/yy Credit Card Payment Purchase) contact name; 2) email; 3) fax; 4) telephone; 5) company name; 6) company mailing address; 7) Tax

304

Microfabrication Project Proposal Form Principle Investigator: (Person responsible for project)  

E-Print Network [OSTI]

Microfabrication Project Proposal Form Principle Investigator: (Person responsible for project: ___________________________________ Department: _____________________ _________________ __ Phone Number: _________________________ Project Information: Project Title: ________________________________________________________________ Funding Agency

305

MaRIE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Materials Science MaRIE aboutassetsimagesicon-faces.jpg MaRIE MaRIE is the experimental facility needed to control the time-dependent properties of materials for national...

306

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

307

cession Numb Main Entry Title Description Restrictions Material type Extent in container Location Slides Map Case M/A Date MM/DD/YY Accession date Notes Folder List 81-002 Froman, Lenore Photographs, 1959  

E-Print Network [OSTI]

Slides Map Case M/A Date MM/DD/YY Accession date Notes Folder List 81-002 Froman, Lenore Photographs, 1959 Five color 35mm slides depicting the departure of R/V Stranger on Naga Expedition, 15 June 1959. Photographs 5 items Slides 1A 1A 7/21/1981 1981 Not Needed 81-003 SIO Ship Operations and Marine Technical

Russell, Lynn

308

Syllabus Fall 2014 | APS 1019 Leadership in Project Management | Dr. Haig Baronikian 1 A) Title: APS1019 Leadership in Project Management  

E-Print Network [OSTI]

people and managing resources to achieve the intended project outcomes and benefits. Leadership is often, Strategy and Project Management Vision, Mission and Values! Strategic Planning and the Balanced Scorecard and Project Management 2 Organizational Culture Organizational Culture plays one of the largest roles

Prodiæ, Aleksandar

309

Category Capstone Project Title Student Names Bioengineering & Medical Devices A Point-of-Care Platform for Neonatal Complete Blood Counts  

E-Print Network [OSTI]

Project Peter Florin, Byron Pakter, Eric Scott, Brian Mick Product Design Concussion Terminator : Football Helmet Design, Analysis, Economics Meyssane Alj Hakim, Bruce Lin, Michael Liou Product Design Alo

Sekhon, Jasjeet S.

310

National Ignition Facility Title II Design Plan  

SciTech Connect (OSTI)

This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed.

Kumpan, S

1997-03-01T23:59:59.000Z

311

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

312

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

UDAC Recommendations UDAC Recommendations Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 Overview of UDAC 2009 Recommendations Recommendation Areas * R&D Program Focus * Program Scope * Process * Program Progress & Value * Societal Impact 3 R&D Program Focus Area * Safety and environmental projects should be considered as separate topics. * Safety and environmental projects should be identified with specific phases of the exploration and production lifecycle. * The project impact assessment utilized in the project selection process should be made public and available to the UDAC. * Fund projects which address the overall safety impact of UDW activity. * Fund projects which address the overall environmental impact of UDW activity. * The metocean program should be strengthened regarding wind and

313

El Ma Electronic Machining srl | Open Energy Information  

Open Energy Info (EERE)

Ma Electronic Machining srl Ma Electronic Machining srl Jump to: navigation, search Name El.Ma. Electronic Machining srl Place Riva del Garda (TN), Italy Zip 38066 Sector Hydro, Hydrogen, Solar, Wind energy Product String representation "Italy-based, in ... solar sectors." is too long. References El.Ma. Electronic Machining srl[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. El.Ma. Electronic Machining srl is a company located in Riva del Garda (TN), Italy . References ↑ "El.Ma. Electronic Machining srl" Retrieved from "http://en.openei.org/w/index.php?title=El_Ma_Electronic_Machining_srl&oldid=344591" Categories: Clean Energy Organizations Companies Organizations

314

DOE - Office of Legacy Management -- Beverly MA Site - MA 04  

Office of Legacy Management (LM)

Beverly MA Site - MA 04 Beverly MA Site - MA 04 FUSRAP Considered Sites Beverly, MA Alternate Name(s): Metal Hydrides, Inc. Ventron Corporation MA.04-1 Location: Congress Street, Beverly, Massachusetts MA.04-4 Historical Operations: Provided uranium metal production under contract with MED. Thorium and radium contamination occurred from non-MED operations. MA.04-6 Eligibility Determination: Eligible MA.04-1 Radiological Survey(s): Assessment Survey, Verification Survey MA.04-4 MA.04-7 Site Status: Certified- Certification Basis, Federal Register Notice included MA.04-5 MA.04-6 MA.04-7 Long-term Care Requirements: Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites S07566_FUSRAP Also see Beverly, MA, Site Documents Related to Beverly, MA Beverly Site Aerial Photograph

315

MA 16020 -- CALCULATOR POLICY  

E-Print Network [OSTI]

MA 16020 -- CALCULATOR POLICY. A ONE-LINE scientific calculator is REQUIRED. No other calculator is allowed. RECOMMENDED: TI-30Xa calculator

OwenDavis

2014-08-20T23:59:59.000Z

316

Grant Reference Grant Holder Research Organisation Project Title NE/I015299/1 Robert Upstill-Goddard Newcastle University Surfactant control of air-sea gas exchange in coastal waters  

E-Print Network [OSTI]

Grant Reference Grant Holder Research Organisation Project Title NE/I015299/1 Robert Upstill of Holocene Monsoon intensity from Central Asia NE/I016414/1 Michael James Lancaster University Quantifying's University of Belfast 14C as a tool to trace terrestrial carbon in a complex lake: implications for food

317

Lead Grant Reference Lead Grant RO Grant Holder Last Name, First Name Project Title NE/K000071/1 Newcastle University Mr R Gaulton Dual-wavelength laser scanning for forest health  

E-Print Network [OSTI]

Newcastle University Mr R Gaulton Dual-wavelength laser scanning for forest health monitoring. NE/K000381/1Lead Grant Reference Lead Grant RO Grant Holder Last Name, First Name Project Title NE/K000071/1 and sensory mechanisms in bat navigation NE/K000403/1 University of Southampton Dr S Watt Emplacement dynamics

318

Grant Reference Principal Investigator Research Organisation Project Title NE/J013544/1 Professor B Hubbard Aberystwyth University Extended-range optical televiewer imaging of the NEEM deep ice borehole, Greenland  

E-Print Network [OSTI]

Grant Reference Principal Investigator Research Organisation Project Title NE/J013544/1 Professor B Hubbard Aberystwyth University Extended-range optical televiewer imaging of the NEEM deep ice borehole/1 Dr A Bedford Edge Hill University Late Holocene temperature reconstruction from Hawes Water northwest

319

MaJIC: A Matlab Just-In-Time Compiler  

Science Journals Connector (OSTI)

This paper describes our experience with MaJIC, a just-intime compiler for MATLAB. In the recent past, several compiler projects claimed large performance improvements when processing MATLAB code. Most of these projects

George Almasi; David A. Padua

2001-01-01T23:59:59.000Z

320

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Time: 2014-11-18 08:00:00 6456Proposal: NS-2014-6456-A PI: Paris Wiley Institution: Honeywell Corporation Title: Neutron Single Event Effects T... Start Time: 2014-11-19 08:00:00...

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

talks: 18 Presentation number Start time End time Presenter (if not author) First Author Remote Title Primary Task Force Area Alternate Task Force Area 101 9:30 9:37 Irby, Jim...

322

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ImageRotator.items href: 'javascript:void(0)', alt: 'Mule deer near cocooned reactor', title: 'Mule deer near cocooned reactor', image: src: 'http:www.hanford.govc.cfm...

323

--No Title--  

National Nuclear Security Administration (NNSA)

in Table 2.0. According to Title 40 CFR 61.93.(b)(4), (CFR 2002) no credit was taken for pollution control equipment in determining air emissions. The emissions for NESHAPs...

324

Johnston LFG (MA RPS Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

LFG (MA RPS Biomass Facility LFG (MA RPS Biomass Facility Jump to: navigation, search Name Johnston LFG (MA RPS Biomass Facility Facility Johnston LFG (MA RPS Sector Biomass Facility Type Landfill Gas Location Rhode Island Coordinates 41.5800945°, -71.4774291° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.5800945,"lon":-71.4774291,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

325

MaRIE Presentations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

certifiable, flexible, and low-cost product-based solutions to many materials problems. MaRIE 1.0 Matter Radiation Interactions in Extremes 1.0 70th Anniversary (pdf) July 27, 2013...

326

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

327

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

328

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

329

Project Year Project Team  

E-Print Network [OSTI]

; Ian Sims, Student, Electrical and Computer Engineering, Whiting School of Engineering Project Title and Jazz Theory/Keyboard I & II. Technologies Used Digital Audio, Digital Video, Graphic Design, HTML

Gray, Jeffrey J.

330

Ookie Ma | Department of Energy  

Energy Savers [EERE]

Ookie Ma About Us Ookie Ma - Policy and Analysis, Portfolio Manager, Office of Energy Efficiency and Renewable Energy Most Recent Fun Fact Friday: Geeking Out on Energy Data...

331

Cape Wind Project | Open Energy Information  

Open Energy Info (EERE)

Cape Wind Project Cape Wind Project Jump to: navigation, search Name Cape Wind Project Facility Cape Wind Sector Wind energy Facility Type Offshore wind Facility Status Proposed Owner Cape Wind Developer Cape Wind Associates Energy Purchaser National Grid Location Nantucket Sound, MA Coordinates 41.501805°, -70.318333° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.501805,"lon":-70.318333,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

332

PROJECT PLANNING TEMPLATE  

Broader source: Energy.gov (indexed) [DOE]

3 Draft 3 Draft November 19, 2009 Submitted by: Energy Enterprise Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net ii Title Page Document Name: Contractor Project Performance (CPP) Upload Requirements for PARS II, V1.3 Publication Date: November 19, 2009 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07, CLIN 2 Prepared by: Steven Ducharme, PMC, LLC Lenore Morrison, PMC, LLC Judith Bernsen, PMC, LLC Edited by: Norm Ayers, EES, LLC Reviewed by: Larry Flanigan, Energy Enterprise Solutions, LLC Kai Mong, Energy Enterprise Solutions, LLC Ruth Ann Smith, Energy Enterprise Solutions, LLC Approval: _________________________________ John Makepeace, DOE OECM MA-50

333

PROJECT PLANNING TEMPLATE  

Broader source: Energy.gov (indexed) [DOE]

5 5 June 17, 2010 Submitted by: Energy Enterprise Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net ii Title Page Document Name: Contractor Project Performance (CPP) Upload Requirements for PARS II, V1.5 Publication Date: June 17, 2010 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07, CLIN 2 Prepared by: Steven Ducharme, PMC, LLC Lenore Morrison, PMC, LLC Judith Bernsen, PMC, LLC Edited by: Dennis Stoner, EES, LLC Reviewed by: Mark Landry, Dekker, LTD Ken Henderson, Energy Enterprise Solutions, LLC Ruth Ann Smith, Energy Enterprise Solutions, LLC Approval: John Makepeace, DOE OECM MA-50, May 25, 2010 iii Change Control Page

334

Project Acronym AMOP Project title (in French)  

E-Print Network [OSTI]

-role on the evolution of climate (greenhouse gases production) and living resources from ecosystems to fisheries Industrial Research International cooperation International cooperation with: United States - MWN United and the worrying problem of the ocean deoxygenation due to global warming and human activities, OMZs have not been

335

TITLE PAGE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: Seismic and Rockphysics Diagnostics of Title: Seismic and Rockphysics Diagnostics of Multiscale Reservoir Textures Type of Report: Final Technical Reporting Start Date: April 1, 2005 Reporting End Date: June 30, 2005 Principal Investigator: Prof. Gary Mavko Date of Report: July 2005 DOE Award Number: DE-FC26-01BC15354 Submitting Organization: Stanford University, 651 Serra Street, Suite 260, Stanford, CA 94305-4125 1 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warrantee, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not

336

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

TRU Pad 1 Inventory. This project will provide personnel weather shelters (shelters, Mobile Mini) for personnel supporting the ARRA in E-Area while new facilities are being...

337

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

The goal of the project is to reduce the City's energy intensity and costs, and lower GHG emissions. The Technical Energy Audit (TEA) will evaluate systems, equipment and...

338

Presentation title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Department of Energy initiated effort to develop renewable energy resources and reduce GHG emissions * Develop a high level "screening tool" to identify potential projects that...

339

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

and control rights usually and customarily provided to lenders in similar project finance transactions" allows DOE, within its sole discretion and in appropriate circumstances as...

340

Recent Titles  

E-Print Network [OSTI]

Kings River Project, CA-Fre- 1441, CA-Fre-1442, CA-Fre-1443 and CA- Fre-1444, Fresno County, California.

Moratto, Michael J

1984-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

--No Title--  

Energy Savers [EERE]

56 DATE: June 4, 2013, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

342

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

an energy efficiency strategy, retaining technical services, and upgrading the HVAC system for the County of Twin Falls. OCRWM Twin Fall County Energy Efficiency Projects...

343

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Developing an energy efficiency strategy and upgrades for multiple HVAC systems for the city of Hobbs. OCRWM Hobbs Energy Efficiency Project New Mexico Apr 9, 2010 Kathryn Knapp...

344

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

retaining technical services, conducting audits, lighting retrofits, and potential HVAC upgrades for Miles City. OCRWM Miles City Energy Efficiency Projects Montana Apr 3,...

345

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

The tribe proposes to hire an individual and provide energy audit training to create an Energy Auditor position. The project will perform energy audits for local commercial and...

346

--No Title--  

Office of Legacy Management (LM)

March 21, 2014 Re: Instrumentation and Monitoring, Rocky Flats OLF Tt Project : 114-181750 Introduction This technical memorandum provides a summary and evaluation of data...

347

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

& Controls Simulation Engineering High Performance Materials Innovative Energy Concepts Water Management R&D University Research CCSI NRAP Program Plan Project Information...

348

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

a project led by Joseph Oefelein of Sandia National Laboratories will study the combustion processes of internal combustion engines, helping to make vehicles more efficient, thus...

349

--No Title--  

Energy Savers [EERE]

52 DATE: May 6, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

350

--No Title--  

National Nuclear Security Administration (NNSA)

NUCLEAR ENERGY UNIVERSITY PROGRAMS Improved Fission Neutron Data Base for Active Interrogation of Actinides PI: Pozzi, Sara - University of Michigan Project Number: 09-414...

351

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

joined Martin Marietta Energy Systems as project coordinator for the International Thermonuclear Experimental Reactor (ITER) engineering design activities. He became the U.S. ITER...

352

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

376-1297, DeeMillikin@rl.gov Three Fuel Storage Facilities Removed from Hanford's Landscape Completion of Recovery Act Project Reduces Cleanup Footprint RICHLAND, WASH. - Gone...

353

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

and pilot projects The proposed action would involve the purchase and installation of a solar panel system on the community washeteria, a public facility with rest rooms, showers...

354

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Develop energy efficiency and conservation strategy, 2) technical consultant, 3) revolving loan program, 4) sub grants for commercial projects, 5) energy upgrades of city...

355

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Strategy (EECS) focuses upon the following EECBG project activities: "Technical Consultant Services" and "Energy Efficiency Retrofits" as described by the EECBG Program....

356

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Technical consultant, 2) revolving loan program, 3) sub grants for commercial projects, 4) energy upgrades of city facilities Energy Efficiency and Conservation Block Program Hire...

357

GEOL 5303 Project Presentations Presenter name: ______________________________________________  

E-Print Network [OSTI]

GEOL 5303 Project Presentations Presenter name: ______________________________________________ Project title: ___________________________________________________________ Project content Superb Effective Weak Absent Introduction: What is your project topic? Presenter provides a clear introduction

Smith-Konter, Bridget

358

MA 152 Exam 1 Memo  

E-Print Network [OSTI]

that evening on the MA 15910 web page (www.math.purdue.edu/MA15910). 3) The exam is self-explanatory. No questions will be allowed unless a student...

math

2015-01-21T23:59:59.000Z

359

Presentation Title  

Broader source: Energy.gov (indexed) [DOE]

Hawaii Sustainable Energy Project - Hawaii Sustainable Energy Project - NREL Support DOE OE Smart Grid Peer Review Ben Kroposki, PhD, PE November 2-4, 2010 Innovation for Our Energy Future Innovation for Our Energy Future Hawaii Sustainable Energy Project- NREL Objective Funding Summary ($K) FY09 FY10 FY11 300K 300K 300K Technical Scope Provide technical support to Hawaii to reach goal of 70% renewable and energy efficiency Provide technical support to Lanai (MECO and C&C) to help reach goal of 100% renewable energy. Provide Kauai and KIUC with technical support regarding integration of renewable energy. Provide technical support for Hawaii in the areas of grid integration of distributed and renewable energy and smart grid applications Innovation for Our Energy Future Needs and Challenges This project addresses the Smart

360

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BioCee's thin-film coating technology. Bio- hydrocarbons will be converted into fuels by chemical catalytic processes. Advanced Research Projects Agency - Energy (ARPA-E) 25A4083...

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

materials, 3) bike path extension (.5 miles), 4) expand recycling program, 5) install,o solar panels on city building-panels are to be used as a demonstration project to collect...

362

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

between supercomputers and the huge data available in molecular databases like the Human Genome Project," Baudry said. "We have an avalanche of data available to us, and now we...

363

--No Title--  

Broader source: Energy.gov (indexed) [DOE]

Replacing an HVAC system for the city of West New York OCRWM West New York Energy Efficiency Projects New Jersey Apr 9, 2010 Kathryn Knapp Digitally signed by Kathryn Knapp DN:...

364

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

engineering that evolved from their work on a DOE project that focused on developing mobile robots to work in hazardous environments. The invention won an R&D 100 Award in...

365

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Math, Science and Technology Nov. 5 at Georgia Tech in Atlanta. Under the guidance of Boyd Evans and John Mueller, ORNL biomedical engineers, Cain and Liu developed a project...

366

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

New conductor could provide answers for energy demand OAK RIDGE, Tenn., Nov. 7, 2002 - Oak Ridge National Laboratory and 3M Company are hoping for powerful results from a project...

367

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Track 1A: Oil & Gas Production Track 1A: Oil & Gas Production and Utilization-Overview George Guthrie Office of Research and Development National Energy Technology Laboratory Title, Date ‹#› The Need: Energy portfolio is projected to remain anchored by fossil. Sources: U.S. data from EIA, Annual Energy Outlook 2011; World data from IEA, World Energy Outlook 2010, Current Policies Scenario 79% Fossil Energy 78% Fossil Energy 84% Fossil Energy 81% Fossil Energy * Primarily traditional biomass, wood, and waste. Gas 24% Coal 21% Oil 33% Nuclear 8% Renewables 14% Gas 24% Coal 22% Oil 37% Nuclear 8% Renewables 8% Gas 21% Coal 27% Oil 33% Nuclear 6% Renewables* 13% Gas 22% Coal 29% Oil 28% Nuclear 8% Renewables* 15% + 14% + 47% Energy Demand 2008 Energy Demand 2035 World

368

Presentation Title  

Broader source: Energy.gov (indexed) [DOE]

Mexico (PNM) - PV Plus Storage for Simultaneous Voltage Smoothing and Peak Shifting Steve Willard PE Principal Investigator November 3, 2010 Funded in part by the Energy Storage Systems Program of the U.S. Department Of Energy through National Energy Technology Laboratory PNM/DOE SGDP Battery + PV Objectives * Project will co-locate a 2 - 4 MWh Advanced Lead Acid battery with a separately installed 500kW solar PV plant at a utility-owned site to create a firm, dispatchable distributed generation resource. * The project will develop broadly applicable modeling tools. These tools are being developed and used during the project to optimize the battery-system control algorithms, and ultimately will help characterize and further the understanding of feeders with storage and distributed

369

PRESENTATION TITLE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Impacting Federal Projects Impacting Federal Power Tulsa District Dan Brueggenjohann 12 June 2013 BUILDING STRONG ®  Interpretation/Application of CERM-F-2013-18  303(d) Listing of Broken Bow Tailwaters  Interior Least Tern Operations and Habitat Creation  Tulsa Vision 2025  Dam Safety Issues ► Keystone, Pine Creek, Robert S. Kerr, Denison  Lake Eufaula Advisory Committee  Tenkiller Downstream Fishery Issues  Broken Bow Seasonal Pool Update - Cultural Resources Impacts  Arkansas River Navigation Improvement  Oklahoma Comprehensive Water Plan Update BUILDING STRONG ® Interpretation/Application of CERM-F-2013-18  Situation - New Resource Management regulation to increase the capitalization threshold for power marketing agency assets.

370

PRESENTATION TITLE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Southwestern Regional Southwestern Regional Hydropower Conference Michael Biggs, PE Chief, Reservoir Control Section Hydraulics & Technical Services Branch Little Rock District 16 June 2011 BUILDING STRONG ® White River Operations BUILDING STRONG ® Typical River Basin BUILDING STRONG ® Typical Multi Purpose Project BUILDING STRONG ® Typical River Section BUILDING STRONG ® Typical Regulating Station BUILDING STRONG ® White River Basin and Projects BUILDING STRONG ® White River System  Operated as a SYSTEM of reservoirs ► Beaver, Table Rock, Bull Shoals, Norfork are a 4-lake subsystem ► Greers Ferry ► Clearwater  "Comprehensive" system of water control regulation ► encompasses the entire White River basin ► 1 water control plan  Operation of the system is VERY COMPLEX

371

unknown title  

E-Print Network [OSTI]

AbstractThe problem of wastewater treatment in Egypt is a two-fold problem; the first part concerning the existing rural areas, the second one dealing with new industrial/domestic areas. In Egypt several agricultural projects have been initiated by the government and the private sector as well, in order to change its infrastructure. As a reliable energy source, photovoltaic pumping systems have contributed to supply water for local rural communities worldwide; they can also be implemented to solve the problem wastewater environment pollution. The solution of this problem can be categorised as recycle process. In addition, because of regional conditions past technologies are being reexamined to select a smallscale treatment system requiring low construction and maintenance costs. This paper gives the design guidelines of a Photovoltaic Small-Scale Wastewater Treatment Plant (PVSSWTP) based on technologies that can be transferred. KeywordsRenewable energy sources, Photovoltaic, small-scale projects, wastewater treatment. I I.

Photovoltaic Small-scale; Wastewater Treatment; Fadia M. A. Ghali

372

MA 23100 and MA 23200 - FINAL EXAM INFORMATION Fall 2009 ...  

E-Print Network [OSTI]

MSEE = Materials and Electrical Engineering. You may refer to the campus map for their locations. For MA 23100, there's a link (Seating Arrangement) in the...

2009-12-15T23:59:59.000Z

373

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network [OSTI]

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

374

Presentation title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Meeting Transmission Meeting Transmission Challenges in the Rocky Mountain Region Jeff Hein June 21, 2011 Western Renewable Energy Zones Composite photo created by NREL Presentation Outline * WREZ Vision * Chronology * WREZ Initiative Overview * Generation and Transmission Model * Lessons Learned * Future Activities National Renewable Energy Laboratory WREZ Vision * Western Governor's Association and U.S. Department of Energy initiated effort to develop renewable energy resources and reduce GHG emissions * Develop a high level "screening tool" to identify potential projects that allows industry stakeholders to analyze and compare economics of

375

PRESENTATION TITLE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

STRONG STRONG ® Projects Impacting Federal Power Tulsa District Dan Brueggenjohann 9 June 2010 BUILDING STRONG ® 303(d) Listing of Broken Bow Tailwaters Impairment Impaired Use Cadmium Fish and Wildlife Propagation - Trout Fishery Lead Fish and Wildlife Propagation - Trout Fishery Water Temperature* Fish and Wildlife Propagation - Trout Fishery The 303(d) List reports on waters identified as impaired. These waters: Have elevated portions of one or more pollutants. Do not meet one or more water quality standards. Portions of the Mountain Fork River below Broken Bow Dam are on the 2010 draft Oklahoma 303(d) list. * ODWC is currently working to implement a selective withdrawal

376

SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project  

E-Print Network [OSTI]

SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project I. PERSONAL: _______________________________________ Classification: Junior Senior II. PROJECT INFORMATION Type of Project: Thesis Group Project Internship Creative Project Study Abroad Service Learning Project Title

Huang, Haiying

377

unknown title  

E-Print Network [OSTI]

THE GOAL OF PROJECT APOLLO, to place a man on the surfaceof the Moon and return him safely to Earth, was a task for engineering and technology. The resultant transportation system was so robust in its capability that a rich scientific harvest also was gathered in the process. The visibility and magnitude of the Apollo program left the impression, even within the scientific community,that the major lunar scientific questions had been answered. Since the Surveyor project, NASA's unmanned planetary program has ignored the Moon, preferring to concentrate its admittedly limited resources on other bodies in the solar system. In 1972,lunar scientists proposed launching a remote-sensing satellite into lunar polar orbit. Carrying a small number of geochemical and geophysical sensors,the Lunar Polar Orbiter (LBO)was designed to expand to global coverage the limited Apollo orbital science data set. Remote-sensing information from the orbiting Service Modules of Apollos 15, 16,and 17 had been invaluable in revealing the scale and extent of the planetary processes whose nature and timing were decoded in analyses of the returned samples. Low orbital inclination and limited time at the Moon resulted in tantalizingly

unknown authors

378

Discovery and utilization of sorghum genes (Ma5/Ma6)  

DOE Patents [OSTI]

Methods and composition for the production of non-flowering or late flowering sorghum hybrid. For example, in certain aspects methods for use of molecular markers that constitute the Ma5/Ma6 pathway to modulate photoperiod sensitivity are described. The invention allows the production of plants having improved productivity and biomass generation.

Mullet, John E; Rooney, William L; Klein, Patricia E; Morishige, Daryl; Murphy, Rebecca; Brady, Jeff A

2012-11-13T23:59:59.000Z

379

Title page  

Office of Legacy Management (LM)

Institutional Controls Evaluation (ICE) Report: Institutional Controls Evaluation (ICE) Report: Summary of Supporting Information for the Identification and Evaluation of Institutional Controls for the Weldon Spring Site September 2004 prepared by Environmental Assessment Division, Argonne National Laboratory prepared for U.S. Department of Energy, Office of Legacy Management, Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri, under Contract W-31-109-Eng-38 iii September 2004 CHECKLIST FOR INSTITUTIONAL CONTROL (IC) PACKAGE FOR THE WELDON SPRING SITE For identifying, evaluating, selecting the IC mechanisms for the Weldon Spring Site, the items in the checklist below are included in this report. ¥ 1. Provide maps and figures showing boundaries of the land use controls (Section 4 and

380

Main Title  

Broader source: Energy.gov (indexed) [DOE]

50 State Street, Suite 3 50 State Street, Suite 3 Montpelier, VT 05602 Phone: 802-223-8199 web: www.raponline.org Roadmap 2050: A practical guide to a prosperous, low-carbon Europe A project of the European Climate Foundation Presentation to the U.S. Department of Energy Electricity Advisory Committee Michael Hogan, Senior Advisor, RAP 12 July 2011 Month dd, yyyy The objective was to develop a fact based report - supported by key stakeholders and feeding directly into EU decision making 2 Key deliverables ▪ A set of plausible and visionary emissions pathways with an 80% reduction across the EU-27 below 1990 levels by 2050 ▪ Deep dive on the decarbonization of the power sector ▪ Implications on strategic options for the EU ▪ A related set of policy options highlighting poten-

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Project Year Project Team  

E-Print Network [OSTI]

information systems (GIS) tools to design maps that integrate data for visualizing geographic concepts School of Engineering Project Title GIS & Introductory Geography Audience Undergraduate students on how to use the Internet for geographic research, and an interactive introduction to GIS through online

Gray, Jeffrey J.

382

Taught degree MA in Philosophy  

E-Print Network [OSTI]

Philosophy Taught degree MA in Philosophy 1 year full time/2 years part time This MA offers an advanced general grounding in philosophy, which forms a good basis for further research. It includes modules in both the analytic and continental traditions of philosophy, reflecting the wide range

Sussex, University of

383

MaJIC: a Matlab Just-In-time Compiler ? George Almasi and David A. Padua  

E-Print Network [OSTI]

MaJIC: a Matlab Just-In-time Compiler ? George Almasi and David A. Padua galmasi experience with MaJIC, a just-in- time compiler for MATLAB. In the recent past, several compiler projects claimed large performance improvements when processing MATLAB code. Most of these projects are static

Padua, David

384

NREL: Energy Sciences - Jie Ma  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jie Ma Jie Ma Postdoctoral Researcher Photo of Jie Ma Phone: (303) 384-6511 Email: jie.ma@nrel.gov At NREL Since: 2010 Dr. Ma graduated from the University of Science and Technology of China in 2004 and received a Ph.D. degree from Institute of Physics, Chinese Academy of Sciences in 2009. Jie joined the Computational Materials Science Team at NREL as a postdoctoral researcher in March, 2010. He is currently working on computational design and characterization of nanoscale materials for doping, water splitting, and solar cells, using quantum mechanical electronic structure calculation and molecular dynamics simulation techniques. Research Interests Low-dimensional systems (quantum dots, nanotube and nanowires, and surfaces) Doping in semiconductors. Solar cell and water splitting.

385

Title Standards 2001  

Broader source: Energy.gov (indexed) [DOE]

Standards 2001 Standards 2001 A guide for the preparation of title evidence in land acquisitions by the United States of America. Quick links to Contents: Table of Contents / Why Title Standards 2001, and who uses it? / Evidence of title / Abstract of Title Supplemental and Supporting Title Evidence / Title Insurance Policies and Certificates of Title / Final Title Evidence Title Evidence for Condemnations / The Deed to the United States / Special Standards for Texas / Sample Forms U.S. Department of Justice Environment and Natural Resources Division Land Acquisition Section Washington, D.C. 20530 December 29, 2000 (reprint March 23, 2001) [Editor's Note: The reprint of March 23, 2001, added page numbers to the table of contents; added a new item "3" to part B of Form # 1 of the Certificate of Inspection and Possession,

386

DOE - Office of Legacy Management -- Indian Orchard MA Site - MA 08  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Indian Orchard MA Site - MA 08 Indian Orchard MA Site - MA 08 FUSRAP Considered Sites Indian Orchard, MA Alternate Name(s): Chapman Valve Manufacturing Company Chapman Valve Site Crane Company MA.08-3 MA.08-4 Location: 203 Hampshire Street, Indian Orchard, Massachusetts MA.08-2 Historical Operations: Machined extruded natural uranium rods and supplied valves and other products to MED and AEC. Also machined natural uranium rods into slugs for Brookhaven National Laboratory. MA.08-6 MA.08-7 MA.08-8 MA.08-14 Eligibility Determination: Eligible MA.08-2 Radiological Survey(s): Assessment Survey, Verification Survey MA.08-11 MA.08-12 Site Status: Certified - Certification Basis, Federal Register Notice included. MA.08-13 MA.08-14 Long-term Care Requirements: Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites S07566_FUSRAP

387

MA - Office of Management - Energy Conservation Plan  

Broader source: Energy.gov (indexed) [DOE]

MA Energy Conservation Plan MA Energy Conservation Plan January 2010 1 Office of Management Office-Level Energy Conservation Plan January 2010 I. BACKGROUND This energy conservation plan represents an effort to reduce energy consumption within Office of Management (MA) office spaces and to increase employee awareness of and participation in energy conservation measures. II. SCOPE The plan and procedures in this document apply to all Office of Management (MA) office suites in the Forrestal and Germantown Facilities as well as the 950 L'Enfant Plaza Building. The actions and procedures set forth in this plan apply to each separate MA office suite as follows: MA-1: 4A-107 MA-43: 1F-039 MA-70: 7E-074 MA-1.1: 7E-028 MA-43: 1F-037 MA-70: 7E-054 MA-30: GH-081 MA-43:

388

Category:Boston, MA | Open Energy Information  

Open Energy Info (EERE)

Boston, MA Boston, MA Jump to: navigation, search Go Back to PV Economics By Location Media in category "Boston, MA" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Boston MA Massachusetts Electric Co.png SVFullServiceRestauran... 67 KB SVHospital Boston MA Massachusetts Electric Co.png SVHospital Boston MA M... 65 KB SVLargeHotel Boston MA Massachusetts Electric Co.png SVLargeHotel Boston MA... 65 KB SVLargeOffice Boston MA Massachusetts Electric Co.png SVLargeOffice Boston M... 65 KB SVMediumOffice Boston MA Massachusetts Electric Co.png SVMediumOffice Boston ... 65 KB SVMidriseApartment Boston MA Massachusetts Electric Co.png SVMidriseApartment Bos... 65 KB SVOutPatient Boston MA Massachusetts Electric Co.png SVOutPatient Boston MA...

389

York Externally Funded Research Grants and Contracts -July 1, 2009 to December 31, 2009 Rersearcher Project Title Funder Total Funding Start Date End Date  

E-Print Network [OSTI]

of Spatial Framework to Enhance Chronic Disease Surveillance Public Health Agency of Canada $102,936 10 for an Energy Efficient Ontario SeeLine Group LTD. $10,000 11/1/2009 4/30/2010 Bebko, James Mentoring Project Conservation Authority $5,000 12/22/2009 12/31/2010 Bohr, Yvonne Parent-Infant Separation in Trans- national

390

York Externally Funded Research Grants and Contracts -January 1, 2010 to June 30, 2010 Rersearcher Project Title Funder Total Funding Start Date End Date  

E-Print Network [OSTI]

to Low Income Households and an Assessment of Their Debt Relief Options SSHRC $67,029 4/1/2010 3, Uzoamaka N Black Creek Community Capacity Building Project Delta Family Resource Centre $25,284 1 Playing Field Understanding Relative Age Effects in Sport SSHRC $100,563 4/1/2010 3/31/2013 Page 1 of 20

391

Are We There Yet? - Mike Peek, Director, Project Management ...  

Energy Savers [EERE]

- Mike Peek, Director, Project Management (MA-63) More Documents & Publications Project Management Update - Paul Bosco, Director, Office of Acquisition & Project Mgt R1A Slide 1...

392

CAES MaCS Home  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is largely made possible through its partnership with the Advanced Test Reactor National Scientific User Facility (ATR NSUF). MaCS is complementary to the Boise State Center for...

393

MA Org Chart, January 15, 2015  

Energy Savers [EERE]

MA-66 MA-60 Paul Bosco, Director Pat Ferraro, Deputy Director Jay Glascock, Senior Advisor MA-80 Office of the Ombudsman Rita R. Franklin, Director Cathy Barchi, Dep. Director...

394

MA Org Chart, October 9, 2014  

Broader source: Energy.gov (indexed) [DOE]

Montoya, Dep. Director Office of Administrative Management and Support Office of Logistics and Facility Operations Office Travel Management MA-45 Umeki Thorne, Director MA-42...

395

MA Org Chart, October 20, 2014  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Montoya, Dep. Director Office of Administrative Management and Support Office of Logistics and Facility Operations Office Travel Management MA-45 Umeki Thorne, Director MA-42...

396

Program or Field Office: Office of Legacy Management Project Title and I.D. No.: Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida,  

Broader source: Energy.gov (indexed) [DOE]

Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida, Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida, LM 13-13 Location: Largo, Florida Proposed Action or Project Description: DOE proposes to use a Geoprobe to inject emulsified edible soybean oil (EEO) and anaerobic microbial solution into the surficial aquifer at the 4.5 Acre Site adjacent to the DOE Young - Rainey STAR Center (Pinellas Site) in Largo, Florida. The proposed action would enhance naturally occurring anaerobic biodegradation, thereby reducing vinyl chloride contamination along the southwest boundary of the 4.5 Acre Site. Dehalococcoides ethenogenes (DHE) is a type of microbe that occurs naturally in the aquifer. Bioaugmentation with a commercially available DHE culture used in conjunction with the EEO would maximize the efficiency of contaminant biodegradation. No genetically engineered or

397

US NE MA Site Consumption  

Gasoline and Diesel Fuel Update (EIA)

NE MA NE MA Site Consumption million Btu $0 $500 $1,000 $1,500 $2,000 $2,500 $3,000 US NE MA Expenditures dollars ALL ENERGY average per household (excl. transportation) 0 2,000 4,000 6,000 8,000 10,000 12,000 US NE MA Site Consumption kilowatthours $0 $250 $500 $750 $1,000 $1,250 $1,500 US NE MA Expenditures dollars ELECTRICITY ONLY average per household * Massachusetts households use 109 million Btu of energy per home, 22% more than the U.S. average. * The higher than average site consumption results in households spending 22% more for energy than the U.S. average. * Less reliance on electricity for heating, as well as cool summers, keeps average site electricity consumption in the state low relative to other parts of the U.S. However, spending on electricity is closer to the national average due to higher

398

US NE MA Site Consumption  

U.S. Energy Information Administration (EIA) Indexed Site

NE MA NE MA Site Consumption million Btu $0 $500 $1,000 $1,500 $2,000 $2,500 $3,000 US NE MA Expenditures dollars ALL ENERGY average per household (excl. transportation) 0 2,000 4,000 6,000 8,000 10,000 12,000 US NE MA Site Consumption kilowatthours $0 $250 $500 $750 $1,000 $1,250 $1,500 US NE MA Expenditures dollars ELECTRICITY ONLY average per household * Massachusetts households use 109 million Btu of energy per home, 22% more than the U.S. average. * The higher than average site consumption results in households spending 22% more for energy than the U.S. average. * Less reliance on electricity for heating, as well as cool summers, keeps average site electricity consumption in the state low relative to other parts of the U.S. However, spending on electricity is closer to the national average due to higher

399

Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

400

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT (EECBG) - BETTER BUILDINGS NEIGHBORHOOD PROGRAM AT GREATER CINCINNATI ENERGY ALLIANCE Project Title: Home Performance with Energy Star and Better Buildings Performance  

SciTech Connect (OSTI)

The Greater Cincinnati Energy Alliance (Energy Alliance) is a nonprofit economic development agency dedicated to helping Greater Cincinnati and Northern Kentucky communities reduce energy consumption. The Energy Alliance has launched programs to educate homeowners, commercial property owners, and nonprofit organizations about energy efficiency opportunities they can use to drive energy use reductions and financial savings, while extending significant focus to creating/retaining jobs through these programs. The mission of the Energy Alliance is based on the premise that investment in energy efficiency can lead to transformative economic development in a region. With support from seven municipalities, the Energy Alliance began operation in early 2010 and has been among the fastest growing nonprofit organizations in the Greater Cincinnati/Northern Kentucky area. The Energy Alliance offers two programs endorsed by the Department of Energy: the Home Performance with ENERGY STAR Program for homeowners and the Better Buildings Performance Program for commercial entities. Both programs couple expert guidance, project management, and education in energy efficiency best practices with incentives and innovative energy efficiency financing to help building owners effectively invest in the energy efficiency, comfort, health, longevity, and environmental impact of their residential or commercial buildings. The Energy Alliance has raised over $23 million of public and private capital to build a robust market for energy efficiency investment. Of the $23 million, $17 million was a direct grant from the Department of Energy Better Buildings Neighborhood Program (BBNP). The organizations investments in energy efficiency projects in the residential and commercial sector have led to well over $50 million in direct economic activity and created over 375,000 hours of labor created or retained. In addition, over 250 workers have been trained through the Building Performance Training Center, a program that was developed and funded by the Energy Alliance and housed at Cincinnati State Technical and Community College. Nearly 100 residential and commercial contractors currently participate in the Energy Alliances two major programs, which have together served over 2,800 residential and 100 commercial customers. Additionally, the Energy Alliance established loan programs for homeowners, nonprofits and commercial businesses. The GC-HELP program was established to provide up to ten year low interest, unsecured loans to homeowners to cover the energy efficiency products they purchased through the Energy Alliance approved contractor base. To date the Energy Alliance has financed over $1 million in energy efficiency loans for homeowners, without any loans written off. The nonprofit business community is offered five year, fixed-interest rate loans through the Building Communities Loan Fund of $250,000. Additionally, the Energy Alliance has developed GC-PACE, a commercial financing tool that enables buildings owners to finance their energy upgrades through voluntary property assessments deploying low-interest extended-term capital from the bond market. The Energy Alliance and its partners are actively evaluating additional market-based financing solutions.

Holzhauser, Andy; Jones, Chris; Faust, Jeremy; Meyer, Chris; Van Divender, Lisa

2013-12-30T23:59:59.000Z

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Flyer, Title VI  

Broader source: Energy.gov [DOE]

Titles VI and IX of the Civil Rights Act of 1964, as amended prohibit discrimination in programs and activities receiving Federal financial assistance.

402

WIND DATA REPORT Nantucket, MA  

E-Print Network [OSTI]

. Rogers Anthony F. Ellis July 12, 2006 Report template version 1.3 Renewable Energy Research Laboratory Research Laboratory (RERL) at the University of Massachusetts, Amherst in the course of performing work 12, 2006 Renewable Energy Research Laboratory Page 1 University of Massachusetts, Amherst Amherst, MA

Massachusetts at Amherst, University of

403

WIND DATA REPORT Wellfleet, MA  

E-Print Network [OSTI]

by the Renewable Energy Research Laboratory (RERL) at the University of Massachusetts, Amherst in the course, 2007 Renewable Energy Research Laboratory Page 1 University of Massachusetts, Amherst Amherst, MA 01003. Manwell Anthony L. Rogers Anthony F. Ellis May 2, 2007 Report template version 3.0 Renewable Energy

Massachusetts at Amherst, University of

404

WIND DATA REPORT Nantucket, MA  

E-Print Network [OSTI]

by the Renewable Energy Research Laboratory (RERL) at the University of Massachusetts, Amherst in the course L. Rogers Anthony F. Ellis March 30, 2006 Report template version 1.3 Renewable Energy Research Laboratory University of Massachusetts, Amherst 160 Governors Drive, Amherst, MA 01003 www

Massachusetts at Amherst, University of

405

u.s. DEPARTlIiIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

DEPARTlIiIENT OF ENERGY DEPARTlIiIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:Arizona Geological Survey Page 1 of2 STATE: MT PROJECT TITLE: State Geological Survey Contributions to the National Geothermal Data System· New Data MA_CT Funding Opportunit)' Announcement Number Procurement Instrument Number NEPA Control Number CID Number 2850 DE-EEOOO2850 GF0-0Xl2850-MA1 0 Based on my ~yiew of the information concerning the propostd adion, as NEPA Compliance Officer (authorized under DOE Order 451.1 A), I have made the (oUnwine determination: ex, EA, EIS APPENDIX AND NUMBER: Description : 83.1 Site characterization and environmental monitoring Site charactenzation and environmental monitoring (including, but not limited 10, siting, construction, mcx:lificabon, operation,

406

InThrMa | Open Energy Information  

Open Energy Info (EERE)

InThrMa InThrMa Jump to: navigation, search Tool Summary LAUNCH TOOL Name: InThrMa Agency/Company /Organization: InThrMa Sector: Energy Focus Area: - HVAC Resource Type: Software/modeling tools User Interface: Website, Mobile Device Website: www.inthrma.com/ Web Application Link: www.inthrma.com/ Cost: Paid Language: English InThrMa Screenshot References: InThrMa[1] Logo: InThrMa Web based HVAC EMS for Internet connected thermostats, focusing on energy efficiency, including Auto Demand Response capabilities. Harnessing Data & Technology To Derive HVAC Efficiency Overview InThrMa's HVAC Energy Management Suite (EMS) allows users to manage and optimize their HVAC systems from any web browser or mobile phone. The InThrMa EMS provides various tools for programming, monitoring and

407

CSCE4610: Project Grading Sheet (Krishna Kavi)  

E-Print Network [OSTI]

CSCE4610: Project Grading Sheet (Krishna Kavi) Assumption: A report on one or more commercially available architecture Student Name: _____________________________________________ Project Title. are used to determine the difficulty of the project 2. Project Details 60% Completeness Identification

Kavi, Krishna

408

Module Title: Project Module Code: OPTO6005  

E-Print Network [OSTI]

Ibsen, Dr Ping Hua, Prof James Wilkinson Contact (email ID) sm@orc.soton.ac.uk, mi@orc.soton.ac.uk, ph2@orc.soton.ac.uk, jsw@orc.soton.ac.uk Is the module subject to external accreditation? No If yes and optical labs of the ORC 3. Train in technical and hands-on research skills to gain technical insight

Anderson, Jim

409

Office of Acquisition and Project Management (APM) Organization...  

Broader source: Energy.gov (indexed) [DOE]

MA-60 Org chart DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014 Earned Value (EV) Analysis and Project Assessment & Reporting...

410

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

Title IX, Subtitle J (EPAct Title IX, Subtitle J (EPAct 2005) Complementary Program - Office of Research and Development September 2008 2 3 Complementary Program NETL - ORD * Areas of research - Drilling Under Extreme Conditions - Environmental Impacts of Oil and Gas - Enhanced and Unconventional Oil Recovery - Resource Assessment * Institute for Advanced Energy Solutions - West Virginia University, Carnegie-Mellon University, and University of Pittsburgh * Penn State University and Oregon State University 4 Drilling Under Extreme Conditions * Ultra-deep single cutter drilling simulator - Recreates bottom-hole drilling environment of ultra-deep wells (30,000 psi and 481 o F) - Delivered to NETL later this year - Operates with real drilling fluids - X-ray video system images cuttings - Verify the results of the full bit

411

Taught degrees MA in Literature and Philosophy  

E-Print Network [OSTI]

Philosophy Taught degrees MA in Literature and Philosophy 1 year full time/2 years part time This degree is taught jointly by Philosophy and English faculty. Refer to page 87 for details. MA in Philosophy 1 year full time/2 years part time This MA offers an advanced general grounding in philosophy

Sussex, University of

412

Global Environmental Course Title  

E-Print Network [OSTI]

Department Global Environmental Studies Room Course Title Frontier of Sustainability Science Instructor Akihisa MORI, Global Environmental Studies Satoshi KONISHI, Institute of Advanced consisting from a variety of academic field, including philosophy, politics, economics, energy, architecture

Takada, Shoji

413

LM's New Role for the DOE Title X Reimbursement Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program October 16, 2012 - 10:01am Addthis LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program What does this project do? Goal 4. Optimize the use of land and assets Title X of the Energy Policy Act of 1992 authorized U.S. Department of Energy (DOE) to reimburse licensees of 1 thorium and 13 uranium processing sites (Figure 1) for a portion of their remedial action costs attributable

414

LM's New Role for the DOE Title X Reimbursement Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program October 16, 2012 - 10:01am Addthis LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program What does this project do? Goal 4. Optimize the use of land and assets Title X of the Energy Policy Act of 1992 authorized U.S. Department of Energy (DOE) to reimburse licensees of 1 thorium and 13 uranium processing sites (Figure 1) for a portion of their remedial action costs attributable

415

Office of Information Resources (MA-90) | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Office of Information Resources (MA-90) Office of Information Resources (MA-90) Freedom of Information 2007 Annual Report Office of Information Resources (MA-90) More Documents &...

416

Ma-Brueckner correlation energy  

Science Journals Connector (OSTI)

We point out that the e2 dependence of the term in the correlation energy of a high-density electron gas, proportional to the gradient squared of the charge density, was rigorously derived by Ma and Brueckner only for infinitely long-wavelength variations in the charge density. We also correct an error made in obtaining the coefficient of this term which arose because of long-range Coulomb anomalies in the exchange energy which they subtracted from the exchange-correlation energy.

Leonard Kleinman and T. Tamura

1989-08-15T23:59:59.000Z

417

PROJECT PLANNING TEMPLATE  

Broader source: Energy.gov (indexed) [DOE]

U U . . S S . . D D e e p p a a r r t t m m e e n n t t o o f f E E n n e e r r g g y y O O f f f f i i c c e e o o f f M M a a n n a a g g e e m m e e n n t t D D r r a a f f t t C C o o n n c c e e p p t t o o f f O O p p e e r r a a t t i i o o n n s s f f o o r r P P A A R R S S I I I I Draft Version 1.3 July 28, 2009 Submitted by: Energy Enterprises Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net 2 Title Page Document Name: Draft Concept of Operations for PARS II Publication Date: July 28, 2009 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07 CLIN 2 Prepared by: Norm Ayers, EES Reviewed by: Kai Mong, EES Reviewed by: Larry Flanigan EES Approval: _________________________________ John Makepeace, DOE OECM MA-50 3 Change Control Page The change control page contains information about revisions to the document and should be

418

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research and Development Research and Development Project Review Meeting Presenter: John Litynski, PE United States Department of Energy, National Energy Technology Laboratory, U.S. DOE Office of Fossil Energy National Energy Technology Laboratory August 21-23, 2012 Pittsburgh, PA 2 WELCOME 3 * Annual requirement in all cooperative agreements and grants * First complete program review of 126 carbon storage projects - 7 Regional Partnerships (Large scale injection projects) - 14 Infrastructure (Injection, Characterization, systems modeling) - 38 Geologic Storage - 28 Simulation and Risk Assessment - 26 Monitoring, Verification, and Accounting (MVA) - 6 CO2 Use and Reuse - 7 Training Centers * Report on technical progress and financial status of projects * 55 Posters

419

U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

t" t" ! ' U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION Page 1 of3 RECIPIENT :1356 Technologies, Inc. STATE: MA PROJECT TITLE: 1366 Project Silicon: Reclaiming US Silicon PV leadership Funding Opportunity Announcement Number DE-FOA-OOOO566 P~unmenlln5trumeDt Number OE-EE0005737 NEPA Control Number elD Number GF0-0005737-OO1 Based on my review o(tbe information concerning the proposed action, as NEPA Complianct Officer (authoro.ed under DOE Order 4SI.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 83.6 Small- scale research and development, laboratory operations, and pilot projects 81 .31 Installation or relocation of machinery and equipment A9 In(onnation

420

MA transmutation performance in the optimized MYRRHA  

SciTech Connect (OSTI)

MYRRHA (multi-purpose hybrid research reactor for high-tech applications) is a multipurpose research facility currently being developed at SCK-CEN. It will be able to work in both critical and subcritical modes and, cooled by lead-bismuth eutectic. In this paper the minor actinides (MA) transmutation capabilities of MYRRHA are investigated. (Pu + Am, U) MOX fuel and (Np + Am + Cm, Pu) Inert Matrix Fuel test samples have been loaded in the central channel of the MYRRHA critical core and have been irradiated during five cycles, each one consisting of 90 days of operation at 100 MWth and 30 days of shutdown. The reactivity worth of the test fuel assembly was about 1.1 dollar. A wide range of burn-up level has been achieved, extending from 42 to 110 MWd/kg HM, the samples with lower MA-to-Pu ratios reaching the highest burn-up. This study has highlighted the importance of the initial MA content, expressed in terms of MA/Pu ratio, on the transmutation rate of MA elements. For (Pu + Am, U) MOX fuel samples, a net build-up of MA is observed when the initial content of MA is very low (here, 1.77 wt% MA/Pu) while a net decrease in MA is observed in the sample with an initial content of 5 wt%. This suggests the existence of some 'equilibrium' initial MA content value beyond which a net transmutation is achievable.

Malambu, E.; Van den Eynde, G.; Fernandez, R.; Baeten, P.; Ait Abderrahim, H. [SCK-CEN, Boeretang 200, BE-2400 Mol (Belgium)

2013-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Mount Wachusetts Community College Wind Project | Open Energy Information  

Open Energy Info (EERE)

Wachusetts Community College Wind Project Wachusetts Community College Wind Project Jump to: navigation, search Name Mount Wachusetts Community College Wind Project Facility Mount Wachusetts Community College Wind Project Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Mount Wachusetts Community College Developer Mount Wachusetts Community College Energy Purchaser Mount Wachusetts Community College Location Gardner MA Coordinates 42.58855651°, -71.98396683° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.58855651,"lon":-71.98396683,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

422

U.S. Department of Energy Contractor Project Performance  

Broader source: Energy.gov (indexed) [DOE]

7 7 June 25, 2011 Submitted by: Energy Enterprise Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net V1.7 (June 25, 2011) PARS II CPP Upload Requirements ii Title Page Document Name: Contractor Project Performance (CPP) Upload Requirements for PARS II Version Number: 1.7 Publication Date: June 25, 2011 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07, CLIN 4 Prepared by: Steven Ducharme, Energy Enterprise Solutions, LLC Scott Burns, Energy Enterprise Solutions, LLC Reviewed by: Mark Landry, Dekker, LTD Judith Bernsen, Energy Enterprise Solutions, LLC Dennis Stoner, Energy Enterprise Solutions, LLC Approval: John Makepeace, DOE OECM MA-50, May 25, 2010

423

EERE PROJECT MANAGEMENT CENTER NFPA DFT1!lUIINATION  

Broader source: Energy.gov (indexed) [DOE]

OFEN:rRGY OFEN:rRGY EERE PROJECT MANAGEMENT CENTER NFPA DFT1!lUIINATION Page 1 of2 RECIPIENT:Middlesex Community College STATE: MA PROJECf TITLE: Middlesex Community College - Geothermal Project Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number N/A DE-EEOOOO323 GF0-0000323-002 EE323 Based on my review ofthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Inf ormation gathering, analYSiS, and dissemination 82.1 Workplace enhancements B2.2 Building and equipment instrumentation Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audils),

424

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO CO 2 Storage Resource Methodologies Presenter: Angela Goodman Team: Angela Goodman, Grant Bromhal, Brian Strazisar, Traci Rodosta and George Guthrie United States Department of Energy, National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS August 21-23, 2012 Pittsburgh, PA 2 U.S. DEPARTMENT OF ENERGY  OFFICE OF FOSSIL ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY CARBON STORAGE PROGRAM with ARRA Projects Benefits Global Collaborations Technology Solutions Lessons Learned North America Energy Working Group Carbon Sequestration Leadership Forum International Demonstration Projects Canada (Weyburn, Zama,

425

Project Website Information Architecture  

E-Print Network [OSTI]

Project Website Information Architecture Overview Purpose: To describe up front what your initiative/project does. This section does not need to literally be called "Overview;" you can come up with anther suitable title that is more specific to your project. Examples of what to include: Information

426

Market Acceptance of Advanced Automotive Technologies Model (MA3T) Consumer  

Open Energy Info (EERE)

Market Acceptance of Advanced Automotive Technologies Model (MA3T) Consumer Market Acceptance of Advanced Automotive Technologies Model (MA3T) Consumer Choice Model Jump to: navigation, search Tool Summary Name: Market Acceptance of Advanced Automotive Technologies Model (MA3T) Consumer Choice Model Agency/Company /Organization: Oak Ridge National Laboratory OpenEI Keyword(s): EERE tool, Market Acceptance of Advanced Automotive Technologies Model (MA3T) Consumer Choice Model, MA3T Project U.S. consumer demand for plug-in hybrid electric vehicles (PHEV) in competition among various light-duty vehicle technologies for hundreds of market segments based and multiple regions. For more information, contact the ORNL Energy and Transportation Science Division at http://www.ornl.gov/sci/ees/etsd/contactus.shtml References Retrieved from

427

TITLE48CHAPTER9  

Broader source: Energy.gov (indexed) [DOE]

TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS DEPARTMENT OF ENERGY ACQUISITION REGULATION TABLE OF CONTENTS Subchapter A - General 901 - Federal Acquisition Regulations System 902 - Definitions of words and terms 903 - Improper business practices and personal conflicts of interest 904 - Administrative matters Subchapter B - Acquisition Planning 905 - Publicizing contract actions 906 - Competition requirements 908 - Required sources of supplies and services 909 - Contractor qualifications 911 - Describing Agency needs 912 - Acquisition of Commercial Items Subchapter C - Contracting Methods and Contract Types 913 - Simplified acquisition procedures 914 - Sealed bidding 915 - Contracting by negotiation 916 - Types of contracts

428

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wellbores and Drilling Wellbores and Drilling Brian Strazisar NETL Title, Date ‹#› Technology or Capability Overview * 3 primary efforts related to wellbore cement - Risk of wellbore leakage in CO 2 storage/EOR - Stability of foamed cements in deep offshore wells - Shallow gas migration in shale gas wells * Extreme Drilling Laboratory (XDL) - NETL Facility to study drilling processes under conditions that exist at extreme depths ‹#› CO 2 and Wellbore Leakage Risk * Early NETL work defined mechanism for chemical reaction between CO 2 and wellbore cement. * Degradation of cement determined to be too slow to impact well integrity in the absence of preexisting flow paths CaCO 3(s) barrier (2) Degraded Zone (3) Propagation of Fronts Ca(OH) 2 depleted zone (1)

429

CSCE3030: Project Grading Sheet (Krishna Kavi)  

E-Print Network [OSTI]

CSCE3030: Project Grading Sheet (Krishna Kavi) Student Name: _____________________________________________ Project Title: _______________________________________________ 1.Problem Difficulty 15% Originality, material from outside of the class new concepts, etc. are used to determine the difficulty of the project 2

Kavi, Krishna

430

DOE - Office of Legacy Management -- Shpack Landfill - MA 06  

Office of Legacy Management (LM)

Shpack Landfill - MA 06 Shpack Landfill - MA 06 FUSRAP Considered Sites Shpack Landfill, NY Alternate Name(s): Attleboro, MA Metals and Controls Site Norton Landfill area MA.06-2 MA.06-3 Location: 68 Union Road, Norton, Massachusetts MA.06-2 Historical Operations: No AEC activities were conducted on site. Contamination was suspected from disposal of materials containing uranium and zirconium ash. MA.06-2 MA.06-3 Eligibility Determination: Eligible MA.06-1 Radiological Survey(s): Assessment Surveys MA.06-4 MA.06-5 MA.06-6 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. MA.06-7 MA.06-8 USACE Website Long-term Care Requirements: To be determined upon completion. Also see Documents Related to Shpack Landfill, NY MA.06-1 - DOE Memorandum; Meyers to Hart; Subject: Shpack Landfill,

431

u.s. DEPARUIENT OE ENERGY EERE PROJECT MANAGEMENT CENTER NEV...  

Broader source: Energy.gov (indexed) [DOE]

ENERGY EERE PROJECT MANAGEMENT CENTER NEV. DETERlIINATION RECIPI": NT:Ocean Renewable Power Company PROJECT TITLE: TidGen Power System Commercialization Project Pagelof3 STATE:...

432

EV Community Readiness projects: New York City and Lower Hudson...  

Broader source: Energy.gov (indexed) [DOE]

EV Community Readiness projects: New York City and Lower Hudson Valley Clean Communities, Inc. (NY, MA, PA); NYSERDA (ME, NH, VT, MA, RI, CT, NY, NJ, PA, DE, MD, DC) EV Community...

433

M.A. Silva Dias,  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 a 260. 1 a 260. 1 Modelando o Impacto Climático Regional e Remoto do Desmatamento M.A. Silva Dias, 1 R. Avissar, 2 e P. Silva Dias 1,3 As observações e os modelos concordam que os níveis atuais e os padrões de desmatamento da Amazônia de fato intensificam as transferências de massa e energia entre a terra e a atmosfera por meio da criação de circulações impulsionadas termicamente com efeitos significativos sobre a precipitação, mas que variam sazonal e regionalmente. Isso também indicou a necessidade de identificar o limiar onde o aumento do desmatamento realmente implica a diminuição de pluviosidade, conforme apontado pela maioria dos modelos de circulação geral de baixa resolução. Grande parte dos estudos sobre o impacto remoto ainda é exploratória, mas indicam que

434

M.A. POLITICAL SCIENCE Application Checklist  

E-Print Network [OSTI]

M.A. POLITICAL SCIENCE Application Checklist IMPORTANT NOTES 1. Please submit all Application below. 6. Applicants to the M.A. Political Science Program normally should have a four-year baccalaureate degree in Political Science. UNBC and the Political Science Program are committed

Northern British Columbia, University of

435

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DE1'ElUI.nNATION  

Broader source: Energy.gov (indexed) [DOE]

Dedham Dedham us. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DE1'ElUI.nNATION PROJECT TITLE: Dedham Municipal Solar Project Page 1 of2 STATE : MA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-EEOOO3163 DE-EEOOO3163 GF0-0003163-OQ1 0 Based OD my review oftbe information concerning tbe proposed action, as NEPA Compliance Officer (aulhoru.ed under DOE Order 451.1A), I ha ve made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

436

U.S. DEPAR.TlVIENT OF ENERGY EERE PROJECT M_t\NAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

TlVIENT OF ENERGY TlVIENT OF ENERGY EERE PROJECT M_t\NAGEMENT CENTER NEPA DETEIUJ.IINATION Page 1 of3 REClPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE: Hull Municipal Light Plant Offshore Wind Project Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number COP DE-EE0000326 GF0-0000326-002 G0326 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1 A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination 83.1 Site characterization and environmental monitoring Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audits),

437

U S. DEP . .ffiTh.IFNT OF ENERGY EERE PROJECT MANAGEME:'\lT CENTER  

Broader source: Energy.gov (indexed) [DOE]

S. DEP . .ffiTh.IFNT OF ENERGY S. DEP . .ffiTh.IFNT OF ENERGY EERE PROJECT MANAGEME:'\lT CENTER NEPA DETFm.ITNATION Page 1 of2 RECIPIENT:Trustees of Boston University STATE: MA PROJECT TITLE : Prototype Development and Evaluation of Self-Cleaning Concentrated Solar Power Collectors and Receivers (0595-1625) Funding Opportunity Announcement Number DE-FOA-0000595 Procurement Instrument Number NEPA Control Number CID Number DE-EE005794 GF0-0005794-001 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EI S APPENDIX AND NUMBER: Description: 83.6 Small-scale research and development, laboratory operations, and pilot projects Siting, construction, modification, operation, and decommissioning of facilities for smallscale research

438

Project Number: IST-2001-33100 Project Acronym: PROFUNDIS  

E-Print Network [OSTI]

and achievements . . . . . . . . . . . . . . 15 3 Project management and coordination 15 4 Cost breakdown 15 5Project Number: IST-2001-33100 Project Acronym: PROFUNDIS Title : Proofs of Functionality;cation: Public Contract start date 1 January 2002 Duration: 3 years Project co-ordinator: Joachim Parrow

Parrow, Joachim

439

Project Number: IST-2001-33100 Project Acronym: PROFUNDIS  

E-Print Network [OSTI]

and achievements . . . . . . . . . . . . . . 17 3 Project management and coordination 17 4 Cost breakdown 17 5Project Number: IST-2001-33100 Project Acronym: PROFUNDIS Title : Proofs of Functionality Classification: Public Contract start date 1 January 2002 Duration: 3 years Project co-ordinator: Joachim Parrow

Parrow, Joachim

440

Geysers Project Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Geothermal Project Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Geysers Project Geothermal Project Project Location Information Coordinates 38.790555555556°, -122.75583333333° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.790555555556,"lon":-122.75583333333,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Report Title: Mapping  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: Title: Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data Report Type: Final Technical Report Reporting Period Start Date: October 1, 2000 Reporting Period End Date: September 30, 2004 Principal Authors: Albert C. Reynolds, Dean S. Oliver, Yannong Dong, Ning Liu, Guohua Gao, Fengjun Zhang & Ruijian Li Date Report Issued: December 2004 DOE Award Number: DE-FC26-00BC15309 Petroleum Engineering Department The University of Tulsa 600 South College Avenue Tulsa, Oklahoma 74104 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product,

442

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

Traditional Research and NETL Traditional Research and NETL Complementary Research Portfolio September 25, 2012 Alexandra Hakala Technical Coordinator, Shale Gas Office of Research and Development National Energy Technology Laboratory 2 Maximizing Benefits 9 Projects Resource Characterization 12 Projects Production Optimization Department of Energy Office of Fossil Energy Industry Consortium RPSEA Complementary Research Appropriated Funded Program (Extramural) @ NETL Minimizing Impacts 10 Projects Water Treatment 4 Projects Water Resources Mgmt 2 Projects Impact Mitigation and Decision-making 3 Current Appropriated Program Drivers: Secretary of Energy Advisory Board - Recommendations for Federal Agencies * Enhance the quality and quantity of public

443

Category:Projects | Open Energy Information  

Open Energy Info (EERE)

2 subcategories, out of 2 total. P Private Sectors Public Sectors Retrieved from "http:en.openei.orgwindex.php?titleCategory:Projects&oldid272216...

444

MA FAshiON bUsiNEss MA FAshiON MArKETiNg ANd cOMMUNicATiON  

E-Print Network [OSTI]

and South Korea. jhy1492@naver.com Image: Tesco, Retail Fashion Brand. By: Hyeyoun Jun #12;yU li (AMy) MA, and the influence it has on fashion brands and the future of this technology. psk_sawa@hotmail.com Image: 3-D Transform Themselves in the Thai Fashion Market, by creating their Own Brand. My project researches new

Evans, Paul

445

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

Davies Davies Procurement Analyst U.S. Department of Energy Office of Procurement and Assistance Management patricia.davies@hq.doe.gov (202) 287-1381 Department of Energy Change Order Training 28 April 2010 1 Department of Energy * Business Clearance Reviews * Follow-on action to the Pre-negotiation and Post Negotiation Template published by MA-60 * Procurement Management Reviews identified systemic issues with Change Order Management and Change Control * Implements agreement between EM and OPAM for Procurement Process Improvements (Sep 2009) PURPOSE 2 Department of Energy * Regulatory Framework Of Changes * Change Order Management * Requests for Equitable Adjustments (REAs) * Entitlement/Quantum * Pricing Changes and REAs * Recognizing/Pricing Cost Overruns

446

TITLE OF PRESENTATION HERE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Claiming Savings from Claiming Savings from Building Codes Activities Presented by Carolyn Sarno April 4, 2012 DOE Code Compliance Meeting FOR TODAY'S DISCUSSION * Background * Claimed Savings Report * Best Practice - Rhode Island 1 RECENT TRENDS 2 Aggressive new goals directing capture of all cost- effective efficiency * CT, MA, NY, RI VT * $2.5 billion committed to efficiency programs in New England, New York and Mid-Atlantic in 2012 * Multiple funding sources: SBC, RGGI, FCM, rate factors * Next generation of efficiency plans going broader & deeper ATTRIBUTING ENERGY CODE SAVINGS ENERGY EFFICIENCY PROGRAMS * Convene stakeholder advisory group * Identify issues related to PA support for codes (and standards) * Provide procedural guidance for

447

Title of Presentation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Title of Presentation Title of Presentation More Documents & Publications Cybersecurity for Energy Delivery Systems 2010 Peer Review Presentations - Software Engineering...

448

Title Line 2 Commercialization at the  

E-Print Network [OSTI]

-exclusive or exclusive license (royalty free or royalty bearing) ­ Researchers sign acknowledgment #12;Title Title Line 2

Czarnecki, Krzysztof

449

Title Slide Examples  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

measures * Multi-fuel, performance based * Total energy use performance period * Target EUI vs. actual * Piloting in deep retrofit program * 6 projects in pilot Construction...

450

Project Year Spring 2009  

E-Print Network [OSTI]

Project Year Spring 2009 Project Title A Database of Film and Media History and Aesthetics Part 2 experience with colleagues, they were eager to participate in expanding the database to include clips or they simply don't have the time, or both. Solution: The development of a user-friendly database of clips would

Gray, Jeffrey J.

451

Project Documentation Group Members  

E-Print Network [OSTI]

agencies to track client services and outcomes, thus providing sound documentation that justifies stateCSC 4330 Project Documentation 11/30/2009 Group Members: Andy Bursavich Justin Farr Will Folse Chris Miceli Michael Miceli #12;Group Answers I. The Title ­ UREC Client Tracking System II. The project

Kundu, Sukhamay

452

Presentation title goes here  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Future of DR Future of DR March 3, 2011 Sila Kiliccote, Mary Ann Piette, Dave Watson, Rish Ghatikar Deputy, DRRC Program Manager, LBNL SKiliccote@lbl.gov 2 Presentation Overview * Trends * Policy * Technology * Implementations * Load As Resource in Ancillary Services Markets * Future directions towards responsive buildings 3 Trends Policy Dynamic Rates - Large C&I, residential, small commercial Codes and Standards -Title 24, US Green Building Council's LEED Credits Smart Grid Standards effort Ancillary Services Technology Integration of Renewables Energy Storage Technologies - Can DR replace storage? PHEVs and EVs Implementation Linking Energy Efficiency and DR Utility Implementations Smart Grid Investment and Demonstration Grants 4 Demand Side Management and Automated DR Future

453

MA 232 Exam 1 (Green) Spring 2014  

E-Print Network [OSTI]

MA 23200 - Exam 1 (Green). 1. Find the area of the .... D. 4. E. Does not exist. 12. The velocity of a car over the time period 0 ? t ? 3 is given by the function.

2014-02-03T23:59:59.000Z

454

MA 16020 SI slide.pptx  

E-Print Network [OSTI]

SI Study Sessions for MA 16020 -? Spring 2015. Mondays. 4:30 5:20 KRCH 464. Tuesdays. 5:30 6:20 RHPH 162. Thursdays. 4:30 5:20 ARMS 1103.

OwenDavis

2015-01-12T23:59:59.000Z

455

DOE - Office of Legacy Management -- Watertown Arsenal - MA 02  

Office of Legacy Management (LM)

Watertown Arsenal - MA 02 Watertown Arsenal - MA 02 FUSRAP Considered Sites Site: WATERTOWN ARSENAL (MA.02 ) Eliminated from consideration under FUSRAP - Referred to EPA, State of Massachusetts, and the NRC Designated Name: Not Designated Alternate Name: None Location: Building Site 421 , Watertown , Massachusetts MA.02-1 Evaluation Year: 1985 MA.02-2 MA.02-3 Site Operations: Building 421 was used in the late 1940's and early 1950's by M.I.T. under Contract #AT (30-1)-956 for work on African Ores, and a modified ion-exchange technique was developed. Activities at Buildings 34, 41 and the GSA Site were conducted under AEC licensed. MA.02-4 MA.02-5 MA.02-6 Site Disposition: Eliminated - No Authority MA.02-6 MA.02-7 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium MA.02-4

456

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sequestration Program Sequestration Program Sean I. Plasynski, PhD Sequestration Technology Manager November 12, 2009 Mostly CO 2 CO 2 Mostly H 2 Mixed Gas Stream and other gases 2 Key Challenges to Carbon Capture and Storage *Capture Technology - Existing Plants - New Plants (PC) - IGCC *Cost of CCS *Sufficient Storage Capacity *Permanence *Best Practices - Storage Site Characterization - Monitoring/Verification - Site Closure - Etc etc ... *Regulatory Framework - Permitting - Treatment of CO 2 *Infrastructure *Human Capital *Legal Framework - Liability - Ownership * pore space * CO 2 *Public Acceptance (NIMBY  NUMBY) Technical Issues Legal/Social Issues Projects helping to address both categories of issues 3 PC Boiler (With SCR) Sulfur Removal Particulate Removal Ash Coal 7,760 TPD STEAM CYCLE CO 2 Capture Process* ID Fan Air

457

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Atlas II Atlas II Dawn M. Deel Project Manager - Carbon Sequestration 2 Atlas I - Background and Statistics * 2007 - DOE released the first version of the Carbon Sequestration Atlas of the U.S. and Canada * Result of cooperation and coordination among carbon sequestration experts from local, state, and government agencies, as well as industry and academia * Atlas presented the first coordinated assessment of carbon capture and storage (CCS) potential across the majority of the U.S. and portions of western Canada * Over 3,000 hardcopies released * 1,000 CDs mailed * Daily downloads from NETL website * Widespread media and industry attention * Continued public interest 3 Atlas II * Scheduled for release in November 2008 (GHGT9) * Purpose of this update: To update the CO 2 storage portfolio, document differences in CO

458

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

R&D Introduction R&D Introduction Briggs M. White Project Manager National Energy Technology Laboratory United States Department of Energy July 28, 2010 11 th Annual SECA Workshop, Pittsburgh PA 2 SOFC Anode SOFC Cathode air Atmospheric SOFC Oxy-Comb Heat Recovery oxygen CO 2 Condenser CO 2 Compressor & dryer stack gas expander Water Recycle SECA Coal-Based Atmospheric IGFC blower * Atmospheric SOFC with catalytic gasification 25 % Methane * Separate Fuel and Air Streams: Oxy Combustion * Cycle Efficiency (HHV); 99% Capture  ~51% with CO2 Compression  ~54% w/out CO2 Compression air ASU Gas Cleaning (Dry or WGCU) air N 2 coal oxy-comb O 2 Catalytic Gasification CH 4 O 2 CO, H 2 , CH 4 expander 3 SOFC Operating Conditions for Coal Plants Fuel IN Air OUT Fuel OUT Air IN Temperature Model High system efficiency is a key target

459

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Partnership Annual Meeting Partnership Annual Meeting Terrestrial Best Practices Manual Sean I. Plasynski, PhD Sequestration Technology Manager November 16, 2009 Mostly CO 2 CO 2 Mostly H 2 Mixed Gas Stream and other gases 2 BSCSP WESTCARB SWP PCOR MGSC MRCSP SECARB Terrestrial Project Categorization Agricultural soils Soil Reclamation Afforestation Accounting/Aggregation Wetlands Reclamation J A B C D E F G I H K Terrestrial Field Tests - Tree-plantings - No-till farming - Wetlands restoration - Land management: grasslands, grazing lands - Fire management - Forest preservation - Monitoring, mitigation, and verification technologies 3 CCS Best Practice Manuals Critical Requirement For Significant Wide Scale Deployment Capturing Lessons Learned Best Practice Manual Version 1 (Phase II) Version 2 (Phase III) Final Guidelines

460

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Sequestration Atlas of the Carbon Sequestration Atlas of the United States and Canada Dawn Deel, Project Manager, Sequestration Division October 5, 2010 2 Background and Statistics Atlas I - March 2007 * First coordinated assessment of CCS in the US and Canada * Provided maps showing number, location and magnitude of CO 2 sources * Maps showing areal extent of geologic storage sites * Storage potential by Partnership * Digital Atlas developed * Over 3,000 hardcopies released: 1,000 CDs mailed * Daily downloads from NETL website Atlas II - November 2008 * Updated the CO 2 storage portfolio * Documented differences in CO 2 resource and CO 2 capacity * Provided CO 2 emission estimation for stationary sources * Described Interagency collaboration * Illustrated federal lands CO 2 geologic storage potential

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

No Slide Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Nation the Nation US Army Corps US Army Corps of Engineers of Engineers Tenkiller Tenkiller Auxiliary Auxiliary Spillway Project Spillway Project Project Scope: Phase 1 provide a new auxiliary spillway with 5 tainter gates, and maint. bridge Phase 2 construct a new highway bridge, remove the plug and re-water. Phase 1 Started: July 1999 Phase 1 Completed: December 2003 Phase 2 Started: March 2004 Scheduled Completion Date: August 2006 One Corps Serving The Army and the Nation US Army Corps US Army Corps of Engineers of Engineers Total Project Cost: $39.9M Phase 1 Construction Costs: 22.3M Phase 2 Construction Costs: $6.5M Remaining Activities: Complete permanent electrical connections to the substation. Complete stop logs. Tenkiller Tenkiller Auxiliary Auxiliary Spillway Project

462

Staff Recommendations for Remaining Projects in the RME/AP Category Review 5/18/2011 # Task1 SubCat ProjNum Title Sponsor ISRPRec BiOp Accord FY12Req BPA  

E-Print Network [OSTI]

199506425 Policy, Plan and Technical Support of Washington Department of Fish and Wildlife (WDFW)-Yakima/Klickitat Fisheries Project (YKFP) Washington Department of Fish and Wildlife (WDFW) Yes (Qualified) $197,917 Art 2012; project to wind down for close out within FY 2012. 102 B AP 200203100 Growth Modulation in Salmon

463

DEPARTMENT OF ENERGY EERE PROJECT MAN AGEMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Navigant Consulting PROJECT TITLE: Offshore Wind Removing Market Barriers Page 1 of2 STATE: MA Funding Opportunity AnnouncemeDt Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-0000414, topic area 3 DE· EEOOO5364 GF0-0005364-001 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination Information gathenng (including, but not limited 10, literature surveys, Inventories, site visits, and audits), data analysis (indudlnQ, but Dot limited to, computer modeling). document preparation (including, but not limited to, conceptual design,

464

Scenario Projections for Future Market Potentials of Biobased Bulk Chemicals  

Science Journals Connector (OSTI)

Product values are production costs plus profits, and they include variable costs, fixed costs, taxes, insurance fees, plant overheads, allowance for marketing, administration, and R&D, as well as a so-called capital charge representing depreciation and profits. ... Future fossil fuel prices depend on (global) political developments, developments of reserves, exploitation of different fossil resources, and demand. ... This research was partly supported by the European Commission (Research Directorate General), 5th Framework European Network (GROWTH) Program by support of the project BREW with the full title Medium and long-term opportunities and risks of the biotechnological production of bulk chemicals from renewable resources (Contract No. G5MA-CT-2002-00014). ...

Veronika Dornburg; Barbara G. Hermann; Martin K. Patel

2008-02-23T23:59:59.000Z

465

DOE - Office of Legacy Management -- Woburn Landfill - MA 07  

Office of Legacy Management (LM)

Woburn Landfill - MA 07 FUSRAP Considered Sites Site: Woburn Landfill (MA.07) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name:...

466

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

1 1 Presented by: Mark Steele: Ex WAGR Project Manager Decommissioning of Windscale Advanced Gas-Cooled Reactor (WAGR) Slide 2 Introduction * UK policy for nuclear power plant decommissioning is long-term safe- storage of reactor facilities * WAGR Project is being used to demonstrate that such a plant can be fully decommissioned * Project funded by the UK Government * Windscale Licensee UKAEA * During early and mid 1990"s facility modified and construction of Reactor Dismantling Machine and Waste Route * 1999 contract let for the dismantling of the reactor to Magnox Electric - fixed price * Scope included engineering and design, safety submission, provision of equipment and operations

467

Policy Procedure Administrative Directive Title: _____________________________________  

E-Print Network [OSTI]

Policy ­ Procedure ­ Administrative Directive Title: _____________________________________ Policy-President _____________ See also: Related Policies, Procedures and Agreements: Relevant Legislation and Regulations: ____________________________________________________________________________ Background and Purpose: ____________________________________________________________________________ Policy

Northern British Columbia, University of

468

DOE - Office of Legacy Management -- Tracerlab Inc - MA 11  

Office of Legacy Management (LM)

Tracerlab Inc - MA 11 Tracerlab Inc - MA 11 FUSRAP Considered Sites Site: TRACERLAB, INC. (MA.11 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 130 High Street , Boston , Massachusetts MA.11-1 Evaluation Year: 1987 MA.11-3 Site Operations: Research and development regarding uranium irradiation and cesium blocks during the early 1950s. MA.11-1 MA.11-3 Site Disposition: Eliminated - NRC licensed MA.11-2 MA.11-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Cesium MA.11-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to TRACERLAB, INC. MA.11-1 - Tracerlab Letter; Epple to Mason; Subject: Steps to Secure

469

Title 44 Excerpts  

Broader source: Energy.gov (indexed) [DOE]

4 Excerpts 4 Excerpts The United States Code - Title 44 PUBLIC PRINTING AND DOCUMENTS And Miscellaneous Statutes Identify the Authority of the Joint Committee on Printing 1997 EDITION CHAPTER 5 - PRODUCTION AND PROCUREMENT OF PRINTING AND BINDING Section 501. Government printing, and blank-book work for Congress, the Executive Office, the Judiciary, other than the Supreme Court of the United States, and every executive department, independent office and establishment of the Government, shall be done at the Government Printing Office, except- (1) classes of work the Joint Committee on Printing considers to be urgent or necessary to have done elsewhere; and (2) printing in field printing plants operated by an executive department, independent office of establishment, and the procurement of printing by an executive department,

470

Poster Abstract of Seventeenth ARM STM: Sort by Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 Science Team Meeting 7 Science Team Meeting 2007 Proceedings Proceedings Sorted by Title Proceedings Sorted by Author Proceedings Sorted by Category Cover image Poster Abstract of the Seventeenth Atmospheric Radiation Measurement (ARM) Science Team Meeting ARM-CONF-2007, March 2007 Monterey, California View poster abstract by Author or Category or Title. 10 Years of External Data ABSTRACT, POSTER Ma, L., Wagener, R., Gregory, L., Liang, M., Tilp, A., and Cialella, A. A Comparison of Broad-band Fluxes at the Main and Auxiliary AMF Sites During the RADAGAST Campaign. ABSTRACT, POSTER Settle, J. A Comparison of Cloud Radar Profiles of Cloud Occurrence with MMF Simulated Radar Profiles as a Function of the Large-Scale Atmospheric State ABSTRACT, POSTER Marchand, R., Beagley, N., and Ackerman, T.

471

Active Project Justification Statements  

Broader source: Energy.gov (indexed) [DOE]

Project Justification Statements Project Justification Statements Date Received PJS Number Title Owner / Author Status ORG Due Date 10/26/2012 PJS-2012-007 Cost Benefit Analysis for Nuclear Facility Accident Prevention or Mitigation Design Options, Project Justification 1/9/2013 PJS-2013-01 DOE HDBK of Optimizing Radiation Protection of the Public and the Environment 6/24/2013 PJS-2013-03 Review and Approval of Nuclear Facility

472

U.S. DEPARTMENT OF ENERGY EERE PROJECT M~"AGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

M~"AGEMENT CENTER M~"AGEMENT CENTER NEPA DETERMINATION RECIPIENT: Harris Miller Miller & Hanson Page 1 of2 STATE: MA PROJECT TITLE: Environmental Effects of Sediment Transport Alteration and Impacts on Protected Species: Edgartown Tidal Energy Project Funding Opportunity Announcement Number DE-EEOOO2656 Pr~urement Instrument Number DE-EEOOO2656 NEPA Control Number em Number GFo.-1().158 0 Based on my review of the information cODeeming the proposed action, as NEPA Compliance Officer (authorized under DOE Order451.IA), I have made tbe following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A 9 Information gathering (induding. but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling). document preparation (such as conceptual design or feasibility studies, analytical energy supply

473

U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CENTER NEPA DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

11.11) 11.11) U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CENTER NEPA DETERMINATION RECI PIENT: Hudson Valley Community College; sub:Southem Maine Community College PROJECT TITLE: Northeast Photovoltaic Regional Training Provider Page 1 of2 STATE: MA Funding Opportunity Announc:emenl Numbu PnKurtmtnt Instrument Number N[PA Control Number CID Number DE·EEOOO2087 GF().O()()2087 -004 G02087 Based on my review oftbe inronnation concerning the proposed Itction, as NEPA Compliance Officer (authorized under DOE Order 451.1 A). I have made the following determination: ex. EA, EIS APPENDIX AND NUMBER: Description: A 11 Technical advice and assIstance to organizations Technical advice and planning assistance to international, nabonal, state, and local orgamzatlons

474

u.s. DEPARTMENT OF ENERGY EERE PROJECT MAN AGEMENT CENTER NEPADETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

NEPADETERMINATION NEPADETERMINATION Page 1 of3 RECIPIENT:Hul1 Municipal Light Plant STATE : MA PROJECT TITLE: Hull Municipal light Plant Offshore Wind Project Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number COP DE·EEOOOO326 GFO.Q()()()326-002 G0326 Ba~d on my review Dfthe information concerning the proposed action, as N[PA Complianu Officer (authoriztd under DOE Order 451.IA), I han made the following determination: ex, EA, [IS APPENDIX AND NUMBER: Ocscriplion : A91nfonnatJon gathering, analy s is, and dissemination 83.1 Site characterization and environmental monitoring Information gathenng (includmg, but not limited 10, literature surveys, InventOries. site VISits, and audits). data analYSIS (indudlng, but not limited to, computer modeling), document preparation (Including

475

U.S. DEPARTh:IENT OF ENERGY EERE PROJECT \-1ANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

DEPARTh:IENT OF ENERGY DEPARTh:IENT OF ENERGY EERE PROJECT \-1ANAGEMENT CENTER NEPA DET~ITNATION Page 1 of2 RECIPIENT:MIT STATE: MA PROJECT TITLE : Continuous Processing of High Thermal Conductivity Polyethylene Fibers and Sheets Funding Opportunity Announcement Number DE-FOA0000560 Procurement Instrument Number NEPA Control Number CID Number DE-EE0005756 GF0-0005756-001 G05756 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audits), data analysis (including. but not limited to, computer modeling), document preparation

476

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

Work Authorization Document NSTX Upgrade Project Control Account #: 1302 Title: WBS 1.1.11 Title Functional Manager P. Heitzenroeder Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS and includes design modifications and upgrade of the coil assembly stand; procedures for assembling the Center

Princeton Plasma Physics Laboratory

477

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

Work Authorization Document NSTX Upgrade Project Control Account #: 7900 Title: WBS 1.7.3 Title Functional Manager L. Dudek Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS Dictionary procedures and documents to support the integrated tests, and to support performance of the pre

Princeton Plasma Physics Laboratory

478

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

Successful Risk Management Successful Risk Management Lessons Learned from the Spallation Neutron Source Suzanne Herron U.S. ITER Deputy Project Manager Former SNS Project Controls Manager The Spallation Neutron Source (SNS) achieved world-class objectives * Construction completed ahead of schedule (June 2006) and under budget ($1.411B) * World's leading facility for neutron science * Room for eventual 25 instruments spanning physics, chemistry, biology, and materials science * Upgradeable to higher power, second target SNS was a partnership among six national labs and a major industrial partner SNS partners owned major scope, budget, and risk! Total Project $1411.7M Argonne National Laboratory Brookhaven National Laboratory Thomas Jefferson National Accelerator Laboratory Legend ANL 45.6 BNL 137.1

479

Title IX | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

IX IX Title IX Title IX of the Education Amendments of 1972, as amended, prohibits discrimination on the basis of sex in all educational programs and activities of institutions that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the basis of sex, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any education program or activity receiving federal financial assistance. Click here to learn more: 20 U.S.C. § 1681(a) The Office of Civil Rights is responsible for monitoring and enforcing compliance with Title IX, investigating Title IX-related complaints, and providing technical assistance related to Title IX to recipients of Department of Energy financial assistance.

480

INSERT PRESENTATION TITLE HERE  

Broader source: Energy.gov (indexed) [DOE]

S. Department of Energy S. Department of Energy National Electric Transmission Congestion Study Workshop Saint Louis, Missouri December 8, 2011 Maureen A. Borkowski President & CEO, Ameren Transmission Company 2 CONGESTION IN THE MIDWEST * Midwest ISO performs regular congestion studies looking at historical and expected future congestion - Top Congested Flowgate Study - Cross-Border Congested Flowgates (with PJM) * Significant congestion exists in several areas - Southeast Missouri, Southern Illinois and Indiana - Chicago area, Southern Wisconsin and Northern Indiana surrounding Lake Michigan - Indiana and Kentucky border * Historically, dozens of transmission projects were evaluated to mitigate congestion on the top congested flowgates - RECB II Benefit/Cost Threshold was used - Only one small project passed the criteria

Note: This page contains sample records for the topic "ma project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

FUELS NETL Team Technical Coordinator: Dirk Link Name Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NETL Team Technical Coordinator: Dirk Link NETL Team Technical Coordinator: Dirk Link Name Title Affiliation Dogan, Omer N Materials Research Eng NETL Haynes, Daniel ST (Chem Eng) NETL How ard, Bret H Research Chemist NETL Link, Dirk D Research Chemist NETL Morreale, Bryan D General Engineer NETL Poston, James A Physicist NETL Shekhaw at, Dushyant General Engineer NETL Smith, David K Physical Science Tech NETL Sorescu, Dan C Research Physicist NETL Ciocco, Mike Project Lead URS Smith, Mark Project Lead URS Abdelsayed, Victor Research Scientist URS Floyd, Donald Scientist URS Smith, Mark Research Engineer URS Name Project Role Affiliation University Project Title Veser, Goetz PI Pitt Task 221 Development of Catalysts for Coal-gas Component Conversion Enick, Robert M PI Pitt Task 331 Membrane Reaction Process for Conversion of Coal-Gas Components

482

3rd year final contractor report for: U.S. Department of Energy Stewardship Science Academic Alliances Program Project Title: Detailed Measurements of Rayleigh-Taylor Mixing at Large and Small Atwood Numbers  

SciTech Connect (OSTI)

This project had two major tasks: Task 1. The construction of a new air/helium facility to collect detailed measurements of Rayleigh-Taylor (RT) mixing at high Atwood number, and the distribution of these data to LLNL, LANL, and Alliance members for code validation and design purposes. Task 2. The collection of initial condition data from the new Air/Helium facility, for use with validation of RT simulation codes at LLNL and LANL. This report describes work done in the last twelve (12) months of the project, and also contains a summary of the complete work done over the three (3) life of the project. As of April 1, 2006, the air/helium facility (Task 1) is now complete and extensive testing and validation of diagnostics has been performed. Initial condition studies (Task 2) is also comp lete. Detailed experiments with air/helium with Atwood numbers up to 0.1 have been completed, and Atwood numbers of 0.25. Within the last three (3) months we have been able to successfully run the facility at Atwood numbers of 0.5. The progress matches the project plan, as does the budget. We have finished the initial condition studies using the water channel, and this work has been accepted for publication on the Journal of Fluid Mechanics (the top fluid mechanics journal). Mr. Nick Mueschke and Mr. Wayne Kraft are continuing with their studies to obtain PhDs in the same field, and will also continue their collaboration visits to LANL and LLNL. Over its three (3) year life the project has supported two(2) Ph.D.s and three (3) MScs, and produced nine (9) international journal publications, twenty four (24) conference publications, and numerous other reports. The highlight of the project has been our close collaboration with LLNL (Dr. Oleg Schilling) and LANL (Drs. Dimonte, Ristorcelli, Gore, and Harlow).

Malcolm J. Andrews

2006-04-14T23:59:59.000Z

483

DOE - Office of Legacy Management -- National Fireworks Ordnance Corp - MA  

Office of Legacy Management (LM)

Fireworks Ordnance Corp - Fireworks Ordnance Corp - MA 13 FUSRAP Considered Sites Site: NATIONAL FIREWORKS ORDNANCE CORP (MA.13) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: American Potash and Chemical Corporation MA.13-3 Location: West Hanover , Massachusetts MA.13-1 Evaluation Year: 1991 MA.13-1 Site Operations: Performed bench scale research and development on uranium forming during the 1960s. MA.13-2 MA.13-3 Site Disposition: Eliminated - Potential for contamination considered remote based on the limited quantity of materials handled MA.13-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium Metal and Powders MA.13-3 Radiological Survey(s): None Indicated MA.13-2 Site Status: Eliminated from consideration under FUSRAP

484

DOE - Office of Legacy Management -- Fenwal Inc - MA 14  

Office of Legacy Management (LM)

Fenwal Inc - MA 14 Fenwal Inc - MA 14 FUSRAP Considered Sites Site: Fenwal, Inc. (MA.14 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Ashland , Massachusetts MA.14-1 Evaluation Year: 1994 MA.14-2 MA.14-3 Site Operations: Performed pilot scale explosion suppression tests on uranium contaminated magnesium fluoride powder in the late 1960s. MA.14-1 MA.14-3 Site Disposition: Eliminated - Potential for contamination considered remote based on the limited quantity of materials handled MA.14-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium MA.14-1 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Fenwal, Inc.

485

The Linden Street Project  

High Performance Buildings Database

Somerville, MA Mostue & Associates, in collaboration with the Somerville Community Corporation and Landmark Structures Corporation, has completed the Linden Street Project, a 42-unit, energy-efficient affordable-housing development in Somerville, Massachusetts. Environmentally friendly design practices were used to achieve building comfort, energy efficiency, and the use of appropriate materials, and also to reclaim this urban enclave for community-oriented living.

486

SciTech Connect: The Mesaba Energy Project: Clean Coal Power...  

Office of Scientific and Technical Information (OSTI)

The Mesaba Energy Project: Clean Coal Power Initiative, Round 2 Citation Details In-Document Search Title: The Mesaba Energy Project: Clean Coal Power Initiative, Round 2 The...

487

Development of a Hydronic Rooftop Unit-HyPak-MA  

SciTech Connect (OSTI)

The majority of U.S. commercial floor space is cooled by rooftop HVAC units (RTUs). RTU popularity derives chiefly from their low initial cost and relative ease of service access without disturbing building occupants. Unfortunately, current RTUs are inherently inefficient due to a combination of characteristics that unnecessarily increase cooling loads and energy use. 36% percent of annual U.S. energy, and two-thirds of electricity, is consumed in and by buildings. Commercial buildings consume approximately 4.2 quads of energy each year at a cost of $230 billion per year, with HVAC equipment consuming 1.2 quads of electricity. More than half of all U.S. commercial floor space is cooled by packaged HVAC units, most of which are rooftop units (RTUs). Inefficient RTUs create an estimated 3.5% of U.S. CO{sub 2} emissions, thus contributing significantly to global warming5. Also, RTUs often fail to maintain adequate ventilation air and air filtration, reducing indoor air quality. This is the second HyPak project to be supported by DOE through NETL. The prior project, referred to as HyPak-1 in this report, had two rounds of prototype fabrication and testing as well as computer modeling and market research. The HyPak-1 prototypes demonstrated the high performance capabilities of the HyPak concept, but made it clear that further development was required to reduce heat exchanger cost and improve system reliability before HyPak commercialization can commence. The HyPak-1 prototypes were limited to about 25% ventilation air fraction, limiting performance and marketability. The current project is intended to develop a 'mixed-air' product that is capable of full 0-100% modulation in ventilation air fraction, hence it was referred to as HyPak-MA in the proposal. (For simplicity, the -MA has been dropped when referencing the current project.) The objective of the HyPak Project is to design, develop and test a hydronic RTU that provides a quantum improvement over conventional RTU performance. Our proposal targeted 60% and 50% reduction in electrical energy use by the HyPak RTU for dry and humid climates, respectively, when compared with a conventional unit, and reduction in peak energy consumption of 50% and 33% respectively. In addition to performance targets, our goal is to develop a production-ready design with durability, reliability and maintainability similar to air-cooled packaged equipment, and that can be commercialized immediately following the conclusion of this project.

Eric Lee; Mark Berman

2009-11-14T23:59:59.000Z

488

Fabrication technology for ODS Alloy MA957  

SciTech Connect (OSTI)

A successful fabrication schedule has been developed at Carpenter Technology Corporation for the production of MA957 fuel and blanket cladding. Difficulties with gun drilling, plug drawing and recrystallization were overcome to produce a pilot lot of tubing. This report documents the fabrication efforts of two qualified vendors and the support studies performed at WHC to develop the fabrication-schedule.

ML Hamilton; DS Gelles; RJ Lobsinger; MM Paxton; WF Brown

2000-03-16T23:59:59.000Z

489

Ma, Dong and Gress QUARTERLY PROGRESS REPORT  

E-Print Network [OSTI]

and Leachability of Coal Combustion Residues in Florida Principal investigator: Lena Q. Ma- Environmental soil of this study is to determine the physical and chemical characteristics of coal combustion residues (CCR chemistry (Professor) Affiliation: Soil and Water Science Department, UF, Gainesville, FL 32611 Associate

Ma, Lena

490

Grid Security: Expecting the Mingchao Ma  

E-Print Network [OSTI]

Grid Security: Expecting the Unexpected Mingchao Ma STFC � Rutherford Appleton Laboratory, UK #12;Slide 2 Overview � Security Service Challenges (SSC) Review � Grid Security Incident � What had happened of the LCG/EGEE Grid Sites (Dec 2008) http://www.gridpp.ac.uk/security/ssc/ https

University College London

491

Main Title 32pt  

Broader source: Energy.gov (indexed) [DOE]

Joint Energy Storage Joint Energy Storage Initiative November 2, 2010 Georgianne Huff Sandia National Laboratories Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. Cooperation on ESS projects in New York * Demonstrate electric energy storage for increasing reliability and for electric energy management to be: - technically viable - cost-effective - broadly applicable Start: FY2005 DOE/NYSERDA MOU DOE/Sandia Activities * Assist in project selection process * Data Acquisition System Management - - EnerNex * Data and Economic Analysis - - Distributed Utilities Associates

492

No Slide Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wheat Ridge, CO 80033 * www.tda.com Wheat Ridge, CO 80033 * www.tda.com A Low Cost, High Capacity Regenerable Sorbent for Pre-Combustion CO 2 Capture Contract No: DE-FE0000469 Principal Investigator Gökhan Alptekin, PhD DOE Project Manager Ms. Sara Zenner Project Kick-off Meeting NETL, Pittsburgh, PA November 12, 2009 TDA R e s e a r c h 2  Privately Owned / Began operations in 1987  ~13 million revenue in 2009  84 full-time technical staff  Primarily chemists and engineers, more than half with advanced degrees (26 PhDs) TDA Research, Inc. Wheat Ridge Facility Golden Facility 12345-12355 W 52 nd Avenue 22,000 ft 2 offices and labs Synthetic Chemistry, Catalyst/Sorbent Synthesis and Testing, Machine and Electronics Shops, SEM, TOF Mass Spec 4663 Table Mountain Drive 27,000 ft 2 offices and labs

493

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

BROOKHAVEN SCIENCE ASSOCIATES BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Risk Management Diane Hatton Associate Director, NSLS-II Project Support Division, BNL November 4, 2009 2 BROOKHAVEN SCIENCE ASSOCIATES Risk Management Steps * identify potential vulnerabilities/risks * determine their likelihood of occurring * assess their impact on the project technical, cost, and schedule baselines * determine activities that would reduce/mitigate the risk Consolidated risk entries to manageable numbers * execute a plan to accomplish these risk-reducing activities * risk reporting/tracking STEP 1 3 BROOKHAVEN SCIENCE ASSOCIATES Risk Management Steps * Bottom up Risk Analysis produced 407 Risk Register Entries * Mixture of risks (can be mitigated) and uncertainties (things beyond our control) * Repetition and redundancy (e.g. higher than usual inflation and exchange rate, out-year

494

US Recovery Act Smart Grid Projects - Equipment Manufacturing | Open Energy  

Open Energy Info (EERE)

Georgia_System_Operations_Corporation_Inc._Smart_Grid_Project\" Georgia_System_Operations_Corporation_Inc._Smart_Grid_Project\" title=\"Georgia System Operations Corporation Inc. Smart Grid Project\">Georgia System Operations Corporation Inc. Smart Grid Project","title":"Georgia System Operations Corporation Inc. Smart Grid Project","link":null,"lat":33.8545479,"lon":-84.2171424,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Project\" title=\"Whirlpool Corporation Smart Grid Project\">Whirlpool Corporation Smart Grid

495

US Recovery Act Smart Grid Projects - Electric Transmission Systems | Open  

Open Energy Info (EERE)

American_Transmission_Company_LLC_II_Smart_Grid_Project\" American_Transmission_Company_LLC_II_Smart_Grid_Project\" title=\"American Transmission Company LLC II Smart Grid Project\">American Transmission Company LLC II Smart Grid Project","title":"American Transmission Company LLC II Smart Grid Project","link":null,"lat":43.0116784,"lon":-88.2314813,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Project\" title=\"American Transmission Company LLC Smart Grid Project\">American

496

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by  

E-Print Network [OSTI]

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by 2013 Priority to Benefit Square Feet Feet Project (Proj. Cost/ Recommended reference No Project Title Year 1 Year 2 Year 3 Year 4 Year 5 from Projects (NASF) (GSF) Cost GSF) Date/Rec No. 1 UTILITIES

Slatton, Clint

497

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by  

E-Print Network [OSTI]

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by 2014 Priority to Benefit Square Feet Feet Project (Proj. Cost/ Recommended reference No Project Title Year 1 Year 2 Year 3 Year 4 Year 5 from Projects (NASF) (GSF) Cost GSF) Date/Rec No. 1 UTILITIES

Slatton, Clint

498

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by  

E-Print Network [OSTI]

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by 2015 Priority to Benefit Square Feet Feet Project (Proj. Cost/ Recommended reference No Project Title Year 1 Year 2 Year 3 Year 4 Year 5 from Projects (NASF) (GSF) Cost GSF) Date/Rec No. 1 UTILITIES

Slatton, Clint

499

Canby Cascaded Project Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Canby Cascaded Project Geothermal Project Canby Cascaded Project Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Canby Cascaded Project Geothermal Project Project Location Information Coordinates 41.443888888889°, -120.87027777778° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.443888888889,"lon":-120.87027777778,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

500

DOE - Office of Legacy Management -- Nuclear Metals Inc - MA 09  

Office of Legacy Management (LM)

Metals Inc - MA 09 Metals Inc - MA 09 FUSRAP Considered Sites Site: NUCLEAR METALS, INC. (MA.09) Eliminated from consideration under FUSRAP - Licensed facility - included in NRC action plan (Site Decommissioning Management Plan) in 1990 for cleanup Designated Name: Not Designated Alternate Name: None Location: 1555 Massachusetts Ave. , Cambridge , Massachusetts MA.09-2 Evaluation Year: 1987 MA.09-1 Site Operations: Produced natural uranium tubes for Savannah River reactor program and fabricated power reactor fuel elements under AEC/NRC license. MA.09-4 MA.09-3 Site Disposition: Eliminated - No Authority under FUSRAP - AEC licensed operation MA.09-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Thorium MA.09-1 Radiological Survey(s): None Indicated