National Library of Energy BETA

Sample records for lot case status

  1. DOE Zero Energy Ready Home Case Study: Mandalay Homes, Vision Hill Lot 1,

    Energy Savers [EERE]

    Glendale, AZ | Department of Energy Vision Hill Lot 1, Glendale, AZ DOE Zero Energy Ready Home Case Study: Mandalay Homes, Vision Hill Lot 1, Glendale, AZ Case study of a DOE 2015 Housing Innovation Award winning production home in the hot-dry climate that got a HERS 52 without PV, or HERS -2 with PV, with 2x6 16" on center walls with R-14 ocsf plus R-4 rigid exterior; slab on grade with R-8 slab edge; sealed attic with R-31 ocsf under roof deck; 92 AFUE furnace, 15 SEER AC, 100% LED.

  2. DOE ZERH Case Study: Mandalay Homes, Vision Hill Lot 1, Glendale, AZ

    SciTech Connect (OSTI)

    none,

    2015-09-01

    Case study of a DOE 2015 Housing Innovation Award winning production home in the hot-dry climate that got a HERS 52 without PV, or HERS -2 with PV, with 2x6 16” on center walls with R-14 ocsf plus R-4 rigid exterior; slab on grade with R-8 slab edge; sealed attic with R-31 ocsf under roof deck; 92 AFUE furnace, 15 SEER AC, 100% LED.

  3. Category:BLM CaseStatus | Open Energy Information

    Open Energy Info (EERE)

    ENERGYGeothermal Home BLM Case Status Status of cases issued by the United States Bureau of Land Management (BLM) to organizations to utilize the land resources for geothermal...

  4. HIA 2015 DOE Zero Energy Ready Home Case Study: Mandalay Homes, Vision Hill Lot 1, Glendale, AZ

    Energy Savers [EERE]

    Homes Vision Hill Lot 1 Glendale, AZ DOE ZERO ENERGY READY HOME(tm) The U.S. Department of Energy invites home builders across the country to meet the extraordinary levels of excellence and quality specified in DOE's Zero Energy Ready Home program (formerly known as Challenge Home). Every DOE Zero Energy Ready Home starts with ENERGY STAR Certified Homes Version 3.0 for an energy-efficient home built on a solid foundation of building science research. Advanced technologies are designed in to

  5. Camp Pendleton Saves 91% in Parking Lot Lighting

    SciTech Connect (OSTI)

    2016-01-01

    Case study describes how Camp Pendleton Marine Corps Base replaced high-pressure sodium (HPS) fixtures in one parking lot with high-efficiency induction fixtures for 91% savings in energy use and $5,700 in cost savings annually. This parking lot is estimated to have a simple payback of 2.9 years. Sitewide up-grades yielded annual savings of 1 million kWh.

  6. Camp Pendleton Saves 91% in Parking Lot Lighting | Department of Energy

    Energy Savers [EERE]

    Camp Pendleton Saves 91% in Parking Lot Lighting Camp Pendleton Saves 91% in Parking Lot Lighting Case study describes how Camp Pendleton Marine Corps Base replaced high-pressure sodium (HPS) fixtures in one parking lot with high-efficiency induction fixtures for 91% savings in energy use and $5,700 in cost savings annually. This parking lot is estimated to have a simple payback of 2.9 years. Sitewide up-grades yielded annual savings of 1 million kWh. PDF icon Download the Camp Pendleton case

  7. Walmart Sees the Light for Parking Lots

    Broader source: Energy.gov [DOE]

    I don't think about parking lots often. Hot in the summer and jammed with frantic shoppers during holidays, I try to spend as little time in them as possible. But because my passion is energy...

  8. LEDs and Specification for Parking Lots Lighten Energy Load

    Broader source: Energy.gov [DOE]

    An often-overlooked yet integral part of our communities' landscapes, parking lots influence how we live, work, and play. Parking lots also require substantial energy and money to operate. Business...

  9. LED Parking Lot Lighting Working Group Fact Sheet

    SciTech Connect (OSTI)

    2008-10-01

    This fact sheet describes the Retailer Energy Alliance LED Parking Lot Lighting Working Group and its Technology Procurement Project.

  10. ANALYSIS OF HARRELL MONOSODIUM TITANATE LOT #120111

    SciTech Connect (OSTI)

    Shehee, T.

    2012-02-21

    Monosodium titanate (MST) for use in the Actinide Removal Process (ARP) must be qualified and verified in advance. A single qualification sample for each batch of material is sent to SRNL for analysis, as well as a statistical sampling of verification samples. The Harrell Industries Lot No.120111 qualification and the first 12 verification samples met all the requirements in the specification indicating the material is acceptable for use in the process. Analyses of Pail 125 verification sample fails the criteria for solids content and has measurably lower pH, density, and total bottle weight. The verification sample for Pail 125 was retested for weight percent solids after checking that all of the solids had been suspended. The sample again failed to meet acceptance criteria. SRNL recommends accepting Pails 1 through 120. Pails 121 through 125 should be rejected and returned to the vendor.

  11. Application Assessment of Bi-Level LED Parking Lot Lighting

    SciTech Connect (OSTI)

    Johnson, Megan; Cook, Tyson; Shackelford, Jordan; Pang, Terrance

    2009-02-01

    This report summarizes an assessment project conducted to evaluate light-emitting diode (LED) luminaires with bi-level operation in an outdoor parking lot application.

  12. Army Reserve 63d RSC Achieves 85% Savings in Parking Lot Lighting |

    Energy Savers [EERE]

    Department of Energy Army Reserve 63d RSC Achieves 85% Savings in Parking Lot Lighting Army Reserve 63d RSC Achieves 85% Savings in Parking Lot Lighting Case study describes how the Army Reserve 63d Regional Support Command (RSC) achieved 85% energy savings and $4,000 per year in cost savings by replacing 12 old light fixtures with light-emitting diode fixtures in the military equipment parking area. This project was part of a camp-wide parking lighting retrofit which, on average, delivered

  13. Camp Pendleton Saves 91% in Parking Lot Lighting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Camp Pendleton Saves 91% in Parking Lot Lighting Camp Pendleton Marine Corps Base (MCBCP) won a 2015 Lighting Energy Effciency in Parking (LEEP) Award for cutting energy use by 91% ...

  14. DOE Tour of Zero Floorplans: Vision Hill Lot 1 by Mandalay Homes |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Vision Hill Lot 1 by Mandalay Homes DOE Tour of Zero Floorplans: Vision Hill Lot 1 by Mandalay Homes DOE Tour of Zero Floorplans: Vision Hill Lot 1 by Mandalay Homes

  15. Use of Occupancy Sensors in LED Parking Lot and Garage Applications...

    Office of Scientific and Technical Information (OSTI)

    Experiences Kinzey, Bruce R.; Myer, Michael; Royer, Michael P.; Sullivan, Greg P. LED lighting; parking lot lighting; occupancy sensors LED lighting; parking lot lighting;...

  16. Guide to FEMP-Designated Parking Lot Lighting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TABLE OF CONTENTS 1 INTRODUCTION * FEMP-DESIGNATED PRODUCTS * ENERGY EFFICIENCY METRICS 3 DESIGN PROCESS * STEP-BY-STEP OVERVIEW 6 COMPONENTS OF THE DESIGN * DESIGN CONSIDERATIONS * LIGHTING DESIGN CONSIDERATIONS * LUMINAIRE DISTRIBUTION * COLOR QUALITIES * LIGHT SPECTRUM 13 PARKING LOT LIGHTING DESIGN * DESIGN SCENARIO OVERVIEW * DESIGN SCENARIO - GENERAL LUMINAIRE * DESIGN SCENARIO - FEMP-DESIGNATED LUMINAIRE 17 LIGHTING CONTROLS SAVE ENERGY * STATIC CONTROLS * MULTI-LEVEL CONTROLS 20

  17. MiniBooNE Requires a LOT of Protons

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requires a LOT of Protons Our goal is 1 X 10 21 to be exact! In fact the Booster has been running at record intensities for over a year now delivering protons to MiniBooNE. But for MiniBooNE we actually need more, so we continue to work with our colleagues in Accelerator Division to improve the Booster performance. More protons leads directly to better coverage of the LSND allowed regions as MiniBooNE is statistically limited. Booster Monitoring and Improvement Projects This figure shows

  18. Use of Occupancy Sensors in LED Parking Lot and Garage Applications: Early Experiences

    SciTech Connect (OSTI)

    Kinzey, B. R.; Myer, M. A.; Royer, M. P.; Sullivan, G. P.

    2012-10-01

    Final GATEWAY program report on the early experiences of using occupancy sensors in LED parking lot and garage applications.

  19. Demonstration Assessment of Light-Emitting Diode (LED) Parking Lot Lighting

    Office of Scientific and Technical Information (OSTI)

    in Leavenworth, KS (Technical Report) | SciTech Connect in Leavenworth, KS Citation Details In-Document Search Title: Demonstration Assessment of Light-Emitting Diode (LED) Parking Lot Lighting in Leavenworth, KS This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in a commercial parking lot lighting application, under the U.S. Department of Energy (DOE) Solid-State Lighting Technology GATEWAY Demonstration Program. The parking lot is for

  20. Guide to FEMP-Designated Parking Lot Lighting | Department of Energy

    Office of Environmental Management (EM)

    Lot Lighting Guide to FEMP-Designated Parking Lot Lighting Document provides acquisition guidance and federal efficiency requirements across a variety of product categories, including outdoor pole-arm-mounted area and roadway luminaires, which are a FEMP-designated product category. Federal laws and executive orders mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law. PDF icon parking_lots_guide.pdf More

  1. DOE Zero Energy Ready Home Case Study: Mandalay Homes, Vision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vision Hill Lot 1, Glendale, AZ DOE Zero Energy Ready Home Case Study: Mandalay Homes, Vision Hill Lot 1, Glendale, AZ Case study of a DOE 2015 Housing Innovation Award winning ...

  2. Live Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Users Live Status Queue Look Classic Queue Look Scheduled Outages Outage Log Science Gateway Status Login Node Status Filesystem Status My NERSC Move to CRT Getting Started...

  3. Beam Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beam Status Beam Status Print Loading... You can also view the Operations Group's Beam History archives.

  4. Army Reserve 63d RSC Achieves 85% Savings in Parking Lot Lighting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Army Reserve 63 d RSC Achieves 85% Savings in Parking Lot Lighting In early 2013 the Army ... The following year, the 63 d RSC installed LED fxtures for outdoor lighting at several ...

  5. No cookies but lots of science at Girl Scout STEM Fair at PPPL...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    No cookies but lots of science at Girl Scout STEM Fair at PPPL By Jeanne Jackson DeVoe May 27, 2014 Tweet Widget Google Plus One Share on Facebook Atiba Brereton, a diagnostic...

  6. One ARM, Two Columns and a Whole Lot of Aerosols | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ARM, Two Columns and a Whole Lot of Aerosols One ARM, Two Columns and a Whole Lot of Aerosols July 25, 2012 - 5:49pm Addthis This observatory is part of an air particles research initiative at Cape Cod National Seashore in Massachusetts, and includes dozens of sophisticated instruments that take continuous ground-based measurements of clouds, aerosols, and other atmospheric properties. | Photo courtesy of the ARM Climate Research Facility. This observatory is part of an air particles research

  7. Property:CSC-Status | Open Energy Information

    Open Energy Info (EERE)

    navigation, search Property Name CSC-Status Property Type String Description Geothermal Case Study Challenge (CSC) sign-up status Allows Values Available;Completed;Selected Pages...

  8. Demonstration Assessment of Light-Emitting Diode (LED) Parking Lot Lighting

    Office of Scientific and Technical Information (OSTI)

    at T.J.Maxx in Manchester, NH Phase I (Technical Report) | SciTech Connect at T.J.Maxx in Manchester, NH Phase I Citation Details In-Document Search Title: Demonstration Assessment of Light-Emitting Diode (LED) Parking Lot Lighting at T.J.Maxx in Manchester, NH Phase I A report describing the process and results of replacing existing parking lot lighting, looking at a LED option with occupancy sensors, and conventional alternates. Criteria include payback, light levels, occupant

  9. DOE Tour of Zero: Vision Hill Lot 1 by Mandalay Homes | Department of

    Energy Savers [EERE]

    Energy Vision Hill Lot 1 by Mandalay Homes DOE Tour of Zero: Vision Hill Lot 1 by Mandalay Homes 1 of 8 Mandalay Homes built this 3,181-square-foot home in Glendale, Arizona, to the performance criteria of the U.S. Department of Energy Zero Energy Ready Home (ZERH) program. 2 of 8 This one-level high-efficiency home meets the criteria of the DOE ZERH, ENERGY STAR, Indoor airPLUS, EPA WaterSense, and LEED for Homes Silver programs. 3 of 8 Tiles combine with stone to form pervious surfaces

  10. I have a lot of things to discover | Center for Bio-Inspired Solar Fuel

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Production News Research Highlights Center Research News Media about Center Center Video Library Bisfuel Picture Gallery I have a lot of things to discover 4 Jan 2014 Maxime Fournier is a postdoctoral fellow in the lab of Professor Devens Gust. "My aim here at ASU is to design a new cell in order to collect solar fuels. It is interesting to work here because it is a continuation of my research and also I have a lot of things to discover. It's a good opportunity to share our knowledge

  11. DOE Tour of Zero: Vision Hill Lot 1 by Mandalay Homes | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Vision Hill Lot 1 by Mandalay Homes DOE Tour of Zero: Vision Hill Lot 1 by Mandalay Homes Addthis 1 of 8 Mandalay Homes built this 3,181-square-foot home in Glendale, Arizona, to the performance criteria of the U.S. Department of Energy Zero Energy Ready Home (ZERH) program. 2 of 8 This one-level high-efficiency home meets the criteria of the DOE ZERH, ENERGY STAR, Indoor airPLUS, EPA WaterSense, and LEED for Homes Silver programs. 3 of 8 Tiles combine with stone to form pervious

  12. Beam Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beam Status Print Loading... You can also view the Operations Group's Beam History archives

  13. ANALYSIS OF HARRELL MONOSODIUM TITANATE LOT #s 46000606120, 46000722120, AND 46000808120

    SciTech Connect (OSTI)

    Taylor-Pashow, K.

    2012-10-08

    Monosodium titanate (MST) for use in the Actinide Removal Process (ARP) must be qualified and verified in advance. A single qualification sample for each batch of material is sent to SRNL for analysis, as well as a statistical sampling of verification samples. The Harrell Industries Lot #s 46000706120, 46000722120, and 460008081120 qualification and verification samples met each of the selected specification requirements that were tested with the exception of a few pails being marginally below the lower weight percent solids limit. These deviations from the specifications are viewed as negligible since the corresponding density of the slurries indicates no appreciable shortage of MST solids. Therefore, SRNL recommends acceptance and use of these pails.

  14. Detonation shock dynamics calibration for pBX 9502 with temperature, density, and material lot variations

    SciTech Connect (OSTI)

    Hill, Larry G; Aslam, Tariq D

    2010-01-01

    We present a methodology for scaling the detonation shock dynamics D{sub n}[{kappa}] calibration function to accommodate variations in the HE starting material. We apply our model to the insensitive TATB-based explosive PBX 9502, for which we have enough front curvature rate stick data to characterize three material attributes: initial temperature T{sub 0}, nominal density {rho}{sub 0}, and manufacturing lot (representing different microstructures). A useful feature of the model is that it returns an absolute estimate for the reaction zone thickness, {delta}. Lacking demonstrated material metrics(s), we express microstructural variation indirectly, in terms of its effect on {delta}. This results in a D{sub n}[{kappa}] function that depends on T{sub 0}, {rho}{sub 0}, and {delta}. After examining the separate effects of each parameter on D{sub n}[{kappa}], we compute an arc geometry as a validation problem. We compare the calculation to a PBX 9502 arc experiment that was pressed from one of the calibrated HE lots. The agreement between the model and experiment is excellent. We compute worst, nominal, and best-performing material parameter combinations to show how much difference accrues throughout the arc.

  15. Demonstration Assessment of Light-Emitting Diode (LED) Parking Lot Lighting in Leavenworth, KS

    SciTech Connect (OSTI)

    Myer, Michael; Kinzey, Bruce R.; Curry, Ku'uipo

    2011-05-06

    This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in a commercial parking lot lighting application, under the U.S. Department of Energy (DOE) Solid-State Lighting Technology GATEWAY Demonstration Program. The parking lot is for customers and employees of a Walmart Supercenter in Leavenworth, Kansas and this installation represents the first use of the LED Parking Lot Performance Specification developed by the DOE’s Commercial Building Energy Alliance. The application is a parking lot covering more than a half million square feet, lighted primarily by light-emitting diodes (LEDs). Metal halide wall packs were installed along the building facade. This site is new construction, so the installed baseline(s) were hypothetical designs. It was acknowledged early on that deviating from Walmart’s typical design would reduce the illuminance on the site. Walmart primarily uses 1000W pulse-start metal halide (PMH) lamps. In order to provide a comparison between both typical design and a design using conventional luminaires providing a lower illuminance, a 400W PMH design was also considered. As mentioned already, the illuminance would be reduced by shifting from the PMH system to the LED system. The Illuminating Engineering Society of North America (IES) provides recommended minimum illuminance values for parking lots. All designs exceeded the recommended illuminance values in IES RP-20, some by a wider margin than others. Energy savings from installing the LED system compared to the different PMH systems varied. Compared to the 1000W PMH system, the LED system would save 63 percent of the energy. However, this corresponds to a 68 percent reduction in illuminance as well. In comparison to the 400W PMH system, the LED system would save 44 percent of the energy and provide similar minimum illuminance values at the time of relamping. The LED system cost more than either of the PMH systems when comparing initial costs. However, when the life-cycle costs from energy and maintenance were factored into the scenario, the LED system had lower costs at the end of a 10-year analysis period. The LED system had a 6.1 year payback compared to the 1000W PMH system and a 7.5 year payback versus the 400W PMH system. The costs reflect high initial cost for the LED luminaire, plus more luminaires and (subsequently) more poles for the LED system. The other major issue affecting cost effectiveness was that Leavenworth, Kansas has very low electricity costs. The melded rate for this site was $0.056 per kWh for electricity. However, if the national electricity rate of $0.1022/kWh was used the payback would change to between four and five years for the LED system. This demonstration met the GATEWAY requirements of saving energy, matching or improving illumination, and being cost effective. The project also demonstrated that the Commercial Building Energy Alliance (CBEA) specification works in practice. Walmart appreciated having an entire site lighted by LEDs to gain more experience with the technology. Walmart is reviewing the results of the demonstration as they consider their entire real estate portfolio.

  16. SMARTS status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SMARTS INSTRUMENT STATUS Instrument Status (Last updated: 2016/03/02 14:04:07) Run Number: 97106 Title: Adams Sample 6-4 after heat treat to 1000C [abso strain -10.000 Run Status: ended Last Script Activity: 2016/02/28 20:05:52: End run 97106; mah 300000 abso strain -10.000 100.0 * * * * * * View full script Next Script Command: N/A Proposal#: 7039 Sample#: 2004061 MAH: 302227 Monitor: 132724 Beam Current: 0 Shutter Status: CLSD Used disk space on /home: 59% Used disk space on /disk2: 73% Crate

  17. NPDF status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NPDF INSTRUMENT STATUS Waiting for runs .. Last update: Fri Mar 27 04:43:30 2015 NPDF RECENT DATA PLOTTING Select plot: GSAS - PDF...

  18. Live Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Software Policies User Surveys NERSC Users Group User Announcements Help Staff Blogs Request Repository Mailing List Operations for: Passwords & Off-Hours Status...

  19. Use of Occupancy Sensors in LED Parking Lot and Garage Applications: Early Experiences

    SciTech Connect (OSTI)

    Kinzey, Bruce R.; Myer, Michael; Royer, Michael P.; Sullivan, Greg P.

    2012-11-07

    Occupancy sensor systems are gaining traction as an effective technological approach to reducing energy use in exterior commercial lighting applications. Done correctly, occupancy sensors can substantially enhance the savings from an already efficient lighting system. However, this technology is confronted by several potential challenges and pitfalls that can leave a significant amount of the prospective savings on the table. This report describes anecdotal experiences from field installations of occupancy sensor controlled light-emitting diode (LED) lighting at two parking structures and two parking lots. The relative levels of success at these installations reflect a marked range of potential outcomes: from an additional 76% in energy savings to virtually no additional savings. Several issues that influenced savings were encountered in these early stage installations and are detailed in the report. Ultimately, care must be taken in the design, selection, and commissioning of a sensor-controlled lighting installation, else the only guaranteed result may be its cost.

  20. Storm water runoff for the Y-12 Plant and selected parking lots

    SciTech Connect (OSTI)

    Collins, E.T.

    1996-01-01

    A comparison of storm water runoff from the Y-12 Plant and selected employee vehicle parking lots to various industry data is provided in this document. This work is an outgrowth of and part of the continuing Non-Point Source Pollution Elimination Project that was initiated in the late 1980s. This project seeks to identify area pollution sources and remediate these areas through the Resource Conservation and Recovery Act/Comprehensive Environmental Response, Compensation, and Liability Act (RCRA/CERCLA) process as managed by the Environmental Restoration Organization staff. This work is also driven by the Clean Water Act Section 402(p) which, in part, deals with establishing a National Pollutant Discharge Elimination System (NPDES) permit for storm water discharges. Storm water data from events occurring in 1988 through 1991 were analyzed in two reports: Feasibility Study for the Best Management Practices to Control Area Source Pollution Derived from Parking Lots at the DOE Y-12 Plant, September 1992, and Feasibility Study of Best Management Practices for Non-Point Source Pollution Control at the Oak Ridge Y-12 Plant, February 1993. These data consisted of analysis of outfalls discharging to upper East Fork Poplar Creek (EFPC) within the confines of the Y-12 Plant (see Appendixes D and E). These reports identified the major characteristics of concern as copper, iron, lead, manganese, mercury, nitrate (as nitrogen), zinc, biological oxygen demand (BOD), chemical oxygen demand (COD), total suspended solids (TSS), fecal coliform, and aluminum. Specific sources of these contaminants were not identifiable because flows upstream of outfalls were not sampled. In general, many of these contaminants were a concern in many outfalls. Therefore, separate sampling exercises were executed to assist in identifying (or eliminating) specific suspected sources as areas of concern.

  1. Status | Department of Energy

    Energy Savers [EERE]

    Status Status PDF icon Status More Documents & Publications ICAM Workshop Audit Report: IG-0860 PIA - HSPD-12 Physical and Logical Access System

  2. Weekly Petroleum Status Report

    Gasoline and Diesel Fuel Update (EIA)

    go to the redesigned Weekly Petroleum Status Report.

  3. Tevatron status

    SciTech Connect (OSTI)

    Dugan, G.

    1989-03-01

    The Fermilab Tevatron is both the world's highest energy accelerator system and first large-scale superconducting synchrotron. Since Tevatron commissioning in July 1983, the accelerator has operated in 1984, 1985 and 1987 with extracted beams of 800 GeV for three runs of fixed target physics, and in 1987, and 1988, with proton-antiproton colliding beams at 900 /times/ 900 GeV. This paper will focus on the collider operation of the Tevatron: its present status and the outlook for its longer-term future evolution. 18 refs., 3 figs., 2 tabs.

  4. Army Reserve 63d RSC Achieves 85% Savings in Parking Lot Lighting

    SciTech Connect (OSTI)

    2016-01-01

    Case study describes how the Army Reserve 63d Regional Support Command (RSC) achieved 85% energy savings and $4,000 per year in cost savings by replacing 12 old light fixtures with light-emitting diode fixtures in the military equipment parking area. This project was part of a camp-wide parking lighting retrofit which, on average, delivered 78% energy savings and a simple payback of 4.4 years.

  5. Subject: Proposed 216(h) Regulations To: Brian.Mills@hq.doe.gov and Lot.Cooke@hq.doe.gov.

    Energy Savers [EERE]

    Date: February 12, 2012 Subject: Proposed 216(h) Regulations To: Brian.Mills@hq.doe.gov and Lot.Cooke@hq.doe.gov. We appreciate the opportunity to review the Proposed Regulation for 216(h) of the FPA (16 U.S.C. 824p(h)) and provide comments. After review of the proposed rule, we believe a few changes to the text could greatly improve in the likelihood of reducing the time and cost of necessary environmental reviews, consultations, and permit processing for electric transmission facilities

  6. NIF Status Update - 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    status NIF Status Update - 2014 May - Highlights of May Experiments on NIF Gigabar Equation-of-State Experiments Production of Beryllium Capsules for NIF Begins First Weekly...

  7. Environmental Management Waste Management Facility Waste Lot Profile for the K-770 Scrap Yard Soils and Miscellaneous Debris, East Tennessee Technology Park, Oak Ridge, Tennessee - EMWMF Waste Lot 4.12

    SciTech Connect (OSTI)

    Davenport M.

    2009-04-15

    Waste Lot 4.12 consists of approximately 17,500 yd{sup 3} of low-level, radioactively contaminated soil, concrete, and incidental metal and debris generated from remedial actions at the K-770 Scrap Metal Yard and Contaminated Debris Site (the K-770 Scrap Yard) at the East Tennessee Technology Park (ETTP). The excavated soil will be transported by dump truck to the Environmental Management Waste Management Facility (EMWMF). This profile provides project-specific information to demonstrate compliance with Attainment Plan for Risk/Toxicity-based Waste Acceptance Criteria at the Oak Ridge Reservation, Oak Ridge, Tennessee (DOE 2001). The K-770 Scrap Yard is an approximately 36-acre storage area located southwest of the main portion of ETTP, outside the security perimeter fence in the Powerhouse Area adjacent to the Clinch River. The K-770 area was used to store radioactively contaminated or suspected contaminated materials during and previous to the K-25 Site cascade upgrading program. The waste storage facility began operation in the 1960s and is estimated to at one time contain in excess of 40,000 tons of low-level, radioactively contaminated scrap metal. Scrap metal was taken to the site when it was found to contain alpha or beta/gamma activity on the surface or if the scrap metal originated from a process building. The segregated metal debris was removed from the site as part of the K-770 Scrap Removal Action (RA) Project that was completed in fiscal year (FY) 2007 by Bechtel Jacobs Company LLC (BJC). An area of approximately 10 acres is located in EUs 29 and 31 where the scrap was originally located in the 100-year floodplain. In the process of moving the materials around and establishing segregated waste piles above the 100-year floodplain, the footprint of the site was expanded by 10-15 acres in EUs 30 and 32. The area in EUs 29 and 31 that was cleared of metallic debris in the floodplain was sown with grass. The areas in EUs 30 and 32 have some scattered vegetation but are generally open and accessible. With limited exception, all materials contained in the scrap yard have been removed and disposed at the EMWMF. Soils that underlay the original waste storage area in EUs 29 and 31 as well as soils that underlay the scrap piles in EUs 30 and 32 show substantially elevated radioactivity. In addition to soils present at the site, remaining portions of foundations/floor slabs for Bldgs. K-725, K-726, and K-736 as well as the unnamed pad at the northeast corner of the site constructed to support the sort and segregation operations at the K-770 Scrap Removal Project in 2006 and several other small, unnamed concrete pads are included in this waste lot. While many of these foundations/floor slabs will be removed because they are contaminated, some of the smaller unamed concrete pads will be removed in order to access contaminated soils that are around and under the pads and regrade the site. Appendix E contains a map showing the areas of soil and concrete pads that are expected to be excavated. Soils in the areas indicated on this map will be removed to approximately one foot below the surface. (This corresponds to the soil interval sampled and analyzed to characterize this waste lot.) Contaminants present in the soils are directly derived from metallic debris and rubbish handled by the waste storage operations, are concentrated in the top few inches, and include the predominant constituents of concern associated with the metallic waste already disposed at EMWMF. Additionally, some residual metallic debris remains embedded in the shallow soils that underlay the former debris piles. This residual metallic debris is eligible for disposal in the EMWMF WAC criteria as defined in Waste Profile for: Disposal of the Scrap Removal Project Waste Lot 65.1 East Tennessee Technology Park, Oak Ridge, Tennessee (BJC 2004a). This waste, however, has been included in Waste Lot 4.12 to conform to the more rigorous profiling requirements currently contained in Waste Acceptance Criteria Attainment Team Project Execution Plan Environmental Management Waste Management Facility, Oak Ridge Reservation, Tennessee (BJC 2008a). It comprises approximately 5% of the total mass of material that will be generated under this RA. Incidental amounts of wood and other debris items and secondary waste generated during the RA are also included in this waste lot.

  8. Case Western University | Open Energy Information

    Open Energy Info (EERE)

    University Jump to: navigation, search Name Case Western University Facility Case Western University Sector Wind energy Facility Type Small Scale Wind Facility Status In Service...

  9. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up Carver Email Announcements Archive An archive of email announcements sent to NERSC users regarding Carver. Read More » Timeline Timeline of significant Carver events. Read More » Last edited: 2016-02-01 08:06:28

  10. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Up Announcements All recent NERSC announcements affecting Euclid. Read More » Email Announcements Archive An archive of email announcements sent to NERSC users regarding Euclid. Read More » Known Problems All known current problems with Euclid. Read More » Timeline Timeline of significant Euclid events. Read More » Last edited: 2016-02-01 08:06:12

  11. Heuristic status polling

    DOE Patents [OSTI]

    Archer, Charles J. (Rochester, MN); Blocksome, Michael A. (Rochester, MN); Heidelberger, Philip (Cortlandt Manor, NY); Kumar, Sameer (White Plains, NY); Parker, Jeffrey J. (Rochester, MN); Ratterman, Joseph D. (Rochester, MN)

    2011-06-07

    Methods, compute nodes, and computer program products are provided for heuristic status polling of a component in a computing system. Embodiments include receiving, by a polling module from a requesting application, a status request requesting status of a component; determining, by the polling module, whether an activity history for the component satisfies heuristic polling criteria; polling, by the polling module, the component for status if the activity history for the component satisfies the heuristic polling criteria; and not polling, by the polling module, the component for status if the activity history for the component does not satisfy the heuristic criteria.

  12. Demonstration Assessment of Light-Emitting Diode (LED) Parking Lot Lighting at T.J.Maxx in Manchester, NH Phase I

    SciTech Connect (OSTI)

    Myer, Michael; Goettel, Russell T.

    2010-06-29

    A report describing the process and results of replacing existing parking lot lighting, looking at a LED option with occupancy sensors, and conventional alternates. Criteria include payback, light levels, occupant satisfaction. This report is Phase I of II. Phase I deals with initial installation.

  13. NVN-075005 | Open Energy Information

    Open Energy Info (EERE)

    Type Lot Case Status Authorized Case Type GEOLSENONCOMPPRE2005 Total Acreage 625.68 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF RECLAMATIO...

  14. NVN-083483X | Open Energy Information

    Open Energy Info (EERE)

    Type Lot Case Status Authorized Case Type GEOUNITAGREEMENT Total Acreage 8550 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

  15. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Updates and Status Current Status: Retired on April 30, 2012 Announcements A list of key Franklin announcements and system changes. Read More » Email Announcements Archive An archive of email announcements sent to NERSC users regarding Franklin. Read More » Franklin Timeline This page records a brief timeline of significant events and user environment changes on Franklin. Read More » Last edited: 2016-02-01 08:06:08

  16. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Software Policies User Surveys NERSC Users Group User Announcements Help Staff Blogs Request Repository Mailing List Operations for: Passwords & Off-Hours Status...

  17. Acquisition & Financial Assistance Rules Status | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition & Financial Assistance Rules Status Acquisition & Financial Assistance Rules Status Subscribe to Acquisition & Financial Assistance Rules Status Updates PDF icon ...

  18. Automation Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Automation Status Automation Status Presented at the NREL Hydrogen and Fuel Cell Manufacturing R&D Workshop in Washington, DC, August 11-12, 2011. PDF icon Automation Status More ...

  19. NWP Small Business Status through June 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Small Business Status through June 2014

  20. ARM - Status and Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status and Actions Campaign Details News Field Participants Resources Status and Actions ARM Data Discovery Browse Data Status and Actions For up-to-date campaign action, please see News 28.JUN.07 Requests for all field participants: Please place your preliminary data on the CHAPS ftp site no later than December. Connor Flynn has worked with ARM colleagues to give us a password protected FTP site. If you haven't received the instructions already from Connor regarding how to access the site,

  1. Small Business Status

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Teaming Arrangements on Small Business Status The Department of Energy is planning to set aside for small businesses a number of acquisitions of a very complex nature, requiring a ...

  2. NIF Status Update - 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    news NIF Status Update - 2014 May Gigabar Equation-of-State Experiment Reaches Record Pressures On May 29, the NIF Team fired two gigabar (Gbar)-class equation-of-state experiments...

  3. Fast Global File Status

    Energy Science and Technology Software Center (OSTI)

    2013-01-01

    Fast Global File Status (FGFS) is a system software package that implimints a scalable mechanism to retrieve file information, such as its degree of distribution or replication and consistency.

  4. o CNMS Status Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Town Hall User Meeting (see attached slides) * Agenda: o Intro of UEC o CNMS Status Update o UEC activities o Nominations for open seat on the UEC * Activities o Monthly Telecon o...

  5. Status of Corrective Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP AIB Report » Status of Corrective Actions Status of Corrective Actions at LANL Department of Energy Issues Accident Investigation Board (AIB) Report on February 14 Incident at the Waste Isolation Pilot Project in Carlsbad, New Mexico April 12, 2012 x x Contact Communication Office (505) 667-7000 Corrective Actions Undertaken by Los Alamos National Laboratory though a collaborative effort led by the Associate Director for Environmental Safety and Health (ADESH), the Associate Director for

  6. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updates and Status Current Status: Up Open Issues List of known problems, submitted bug reports and issues we are actively working on Read More » Timeline and Updates A list of major system changes and updates Read More » Email Announcements Archive An archive of email announcements sent to NERSC users regarding Edison Read More » Last edited: 2016-02-01 08:06:23

  7. Web Operational Status Boards

    Energy Science and Technology Software Center (OSTI)

    2004-04-16

    Web Operational Status Boards (WebOSB)is a web-based application designed to acquire, display, and update highly dynamic status information between multiple users and jurisdictions. WebOSB is able to disseminate real-time status information—support the timely sharing of information—with constant, dynamic updates via personal computers and the Internet between emergency operations centers (EOCs), incident command centers, and to users outside the EOC who need to know the information (hospitals, shelters, schools). The WebOSB application far exceeds outdated information-sharingmore » methods used by emergency workers: whiteboards, Word and Excel documents, or even locality-specific Web sites. WebOSB’s capabilities include the following elements: - Secure access. Multiple users can access information on WebOSB from any personal computer with Internet access and a secure ID. Privileges are use to control access and distribution of status information and to identify users who are authorized to add or edit information. - Simultaneous update. WebOSB provides options for users to add, display, and update dynamic information simultaneously at all locations involved in the emergency management effort, A single status board can be updated from multiple locations enabling shelters and hospitals to post bed availability or list decontamination capability. - On-the-fly modification. Allowing the definition of an existing status board to be modified on-the-fly can be an asset during an emergency, where information requirements can change quickly. The status board designer feature allows an administrator to quickly define, modi,, add to, and implement new status boards in minutes without needing the help of Web designers and computer programmers. - Publisher/subscriber notification. As a subscriber, each user automatically receives notification of any new information relating to specific status boards. The publisher/subscriber feature automatically notified each user of any new information relating to specific status boards. WebOSB can be installed to fit the specific needs of an emergency management community. Because it was originally developed to concurrently support multiple EOCs at the local, county, and state level, it can also support multi-user environments for other types of projects.« less

  8. Web Operational Status Boards

    SciTech Connect (OSTI)

    2004-04-16

    Web Operational Status Boards (WebOSB)is a web-based application designed to acquire, display, and update highly dynamic status information between multiple users and jurisdictions. WebOSB is able to disseminate real-time status information?support the timely sharing of information?with constant, dynamic updates via personal computers and the Internet between emergency operations centers (EOCs), incident command centers, and to users outside the EOC who need to know the information (hospitals, shelters, schools). The WebOSB application far exceeds outdated information-sharing methods used by emergency workers: whiteboards, Word and Excel documents, or even locality-specific Web sites. WebOSB?s capabilities include the following elements: - Secure access. Multiple users can access information on WebOSB from any personal computer with Internet access and a secure ID. Privileges are use to control access and distribution of status information and to identify users who are authorized to add or edit information. - Simultaneous update. WebOSB provides options for users to add, display, and update dynamic information simultaneously at all locations involved in the emergency management effort, A single status board can be updated from multiple locations enabling shelters and hospitals to post bed availability or list decontamination capability. - On-the-fly modification. Allowing the definition of an existing status board to be modified on-the-fly can be an asset during an emergency, where information requirements can change quickly. The status board designer feature allows an administrator to quickly define, modi,, add to, and implement new status boards in minutes without needing the help of Web designers and computer programmers. - Publisher/subscriber notification. As a subscriber, each user automatically receives notification of any new information relating to specific status boards. The publisher/subscriber feature automatically notified each user of any new information relating to specific status boards. WebOSB can be installed to fit the specific needs of an emergency management community. Because it was originally developed to concurrently support multiple EOCs at the local, county, and state level, it can also support multi-user environments for other types of projects.

  9. Glueballs: a status report

    SciTech Connect (OSTI)

    Scharre, D.L.

    1982-01-01

    It is expected from quantum chromodynamics (QCD) that glueballs, bound states which contain gluons but no valence quarks, should exist. To date, no conclusive evidence for glueballs has been presented. After a brief review of the expected properties and experimental signatures of glueballs the status of some glueball candidate states are discussed.

  10. Complete LNG Terminal Status Maps

    Broader source: Energy.gov [DOE]

    A series of slides showing the status of various LNG terminals (existing, under construction, proposed, etc.) in North America.

  11. National Hydrogen Learning Demonstration Status

    Broader source: Energy.gov [DOE]

    Presentation slides from the Fuel Cell Technologies Program webinar "National Hydrogen Learning Demonstration Status" held February 6, 2012.

  12. Electronic Status Board

    Energy Science and Technology Software Center (OSTI)

    2004-06-02

    This software was developed to post real-time process status and building conditions to operators, system engineers, system managers, and all support personnel. Data input is via operator console, strategically located throughout the facility, or by electronic rounds tablet. The system requires a person to log in with a unique user id and password to edit data. Viewing system status does not require log in and can be done from any desktop location running FileMaker. Oncemore » logged into the system, all new records saved are stamped with date, time and user name, and a historical copy is created that can be brought up to review status. There is no limitation to the amount of records that can be saved in the historical databases. The system will flag all out of limit conditions on the screen and enter that record on a turnover summery page which displays only flagged items. System conditions are displayed on a plasma display which scrolls through the various system condition screens. The system also shows floor plans that reflect specific building radiological conditions which aides in pre job briefings to show all hazards to personnel entering specific locations. The input screen is displayed on a second standard computer monitor connected to the input PC. There are several popup screens that require user intervention to ensure that the user wants to edit the data, is editing the appropriate sytem, and if they want to continue to stay logged into the system. Each workstation is connected to a Uninterrupted Power Supply which will shut each system down safely in a power failure. The server is configured to print out current status upon notification from the UPS that power has failed. The system also has a video input card which is connected to a DVD/VCR which shows safety meetings, and images taken from a digital camera used to show specific locations/items for pre-job briefings.« less

  13. Weekly Petroleum Status Report

    Gasoline and Diesel Fuel Update (EIA)

    6 Appendix C Northeast Reserves Reserves inventories are not considered to be in the commercial sector and are excluded from EIA's commercial motor gasoline and distillate fuel oil supply and disposition statistics, such as those reported in the Weekly Petroleum Status Report, Petroleum Supply Monthly, and This Week In Petroleum. Northeast Home Heating Oil Reserve classifed as ultra-low sulfur distillate (15 parts per million) Terminal Operator Location Thousand Barrels Buckeye Partners LP

  14. SuperNEMO status

    SciTech Connect (OSTI)

    Chapon, A. [Universite de Caen Basse-Normandie, ENSICAEN, LPC Caen, UMR 6534, 6 boulevard du Marechal Juin, 14050 CAEN Cedex (France); Collaboration: SUPERNEMO Collaboration

    2011-12-16

    The SuperNEMO experiment aims to reach a sensitivity up to 10{sup 26} years on the half-life of neutrinoless double beta decay. The SuperNEMO project strongly inherits from the previous Nemo3 experiment. It will consist of a ''tracko-calo'' modular detector with at least 100 kg of betabeta isotope. The current status of the main R and D tasks will be presented: enrichment and production of source foils, radiopurity control, tracker and calorimeter.

  15. Small Business Status

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Teaming Arrangements on Small Business Status The Department of Energy is planning to set aside for small businesses a number of acquisitions of a very complex nature, requiring a myriad of capabilities on the part of offerors, which might result in teaming arrangements or joint ventures being formed. Given this, the Department believes that potential offerors should be aware of the Small Business Administration's regulations regarding affiliation. As such, DOE will include the following

  16. PDSF Login Node Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PDSF Login Node Status Getting Started Hardware Configuration Using the PDSF Batch System Performance and Optimization Software and Tools Announcements and Meetings Cluster Statistics Getting help Group Pages Using Carver for PDSF jobs PDSF Completed Jobs Genepool Testbeds Retired Systems Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training & Tutorials Software Policies User Surveys NERSC Users

  17. DFC Technology Status

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pinakin Patel Mohammad Farooque FuelCell Energy, Inc. 3 Great Pasture Road Danbury, Ct 06813 DFC Technology Status * Distributed generation puts power where it's needed * Increases power reliability * Near zero emissions allow units to be sited almost anywhere - even polluted urban areas * Reduces need for central generation plants * Reduces grid congestion and need for new transmission lines * Distributed generation enables smart grid * Balances the grid with 24/7 power * Meets requirements for

  18. Status of Wheeler Reservoir

    SciTech Connect (OSTI)

    Not Available

    1990-09-01

    This is one in a series of status reports prepared by the Tennessee Valley Authority (TVA) for those interested in the conditions of TVA reservoirs. This overview of Wheeler Reservoir summarizes reservoir purposes and operation, reservoir and watershed characteristics, reservoir uses and use impairments, and water quality and aquatic biological conditions. The information presented here is from the most recent reports, publications, and original data available. If no recent data were available, historical data were summarized. If data were completely lacking, environmental professionals with special knowledge of the resource were interviewed. 12 refs., 2 figs.

  19. Status of Acquisition Letters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Letters As of 04/01/2014 No. Date Title Owner Status 1 2014-03 01/06/2014 Allowability of Contractor Litigation Defense and Settlement Costs Michael Righi Active 2 2014-02 10/29/2013 Provisional Payment of Fee Michael Righi Active 3 2014-01 10/16/2013 Management and Operating Contractors' Audit Coverage of Cost-Reimbursement Subcontracts Michael Righi Active 4 2013-11 08/05/2013 Non M&O Contractor Business Systems Clauses for Section H Barbara Binney Active 5 2013-10 06/19/2013

  20. Status and Future of TRANSCOM

    Office of Environmental Management (EM)

    Program status g Upcoming Changes Glimpse at future options Versatility Signal relay S t d t Smart-mode system DOE Commitments 14 632010 8 Flexible...

  1. SSRL Light Source Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stanford Synchrotron Radiation Lightsource An Office of Science User Facility Beam Current: 496.25 mA Beam Status: Beams (ACR) Loss Rate: 1.06 mA/min SPEAR Plot SPEAR Operator Messages 7-MAR-2016 06:07 Beam loss detected 7-MAR-2016 06:07:39.17 SSRL BEAMLINES Beamline Steering Periods Gap(mm) Field(T) K Pwr(W) Yield(Ah) 1 Open OK - 48.0 1.249 - 71 1050.72 2 Open OK - 48.0 1.249 - 71 1063.24 4 Open - 10 18.0 1.892 40.64 23289 1063.30 5 Open - 14 30.7 0.340 4.45 643 1052.95 6 Open OK 27 16.0 0.850

  2. The Status of Glueballs

    SciTech Connect (OSTI)

    Lindenbaum, S.J. |

    1993-04-14

    The Status of Glueballs is presented considering that most popular candidates from among the isoscalars in the J{sup PC} = 0{sup ++}, 0{sup {minus}+} and 2{sup ++} channels. It is shown that in the 0{sup ++} channel the f{sub 0}(1720) which was discovered earlier (the S*{prime}(1720)) at BNL is highly likely the same state as the SLAC {theta}(1720) now that its spin has been found to be 0 instead of the 2 claimed for a long period. In the {sup ++} channel there is likely a complex of 2-3 states {zeta}/{eta}(1280), {lambda}/{eta}(1420) and {iota}/{eta}(1520) involving at least one extra isosclar. In the 2{sup ++}, the g{sub T}(2010), g{sub T}{prime}(2300) and g{sub T}{double_prime}(2340) {phi}{phi} states found in {pi}{sup {minus}} p {yields} {phi}{phi}n (OZI forbidden glueball filter channel) strikingly, approximately, completely break the OZI suppression and comprise within the errors all the {phi}{phi} cross-section. The only viable explanation of these states in the context of QCD is that they are produced by 1-3 primary 2{sup ++} glueballs. All alternate explanations in the past 15 years have failed.

  3. Status of MICE

    SciTech Connect (OSTI)

    Soler, F. J. P.

    2010-03-30

    The Muon Ionization Cooling Experiment (MICE) is an experiment currently under construction at the Rutherford Appleton Laboratory (RAL) in the UK. The aim of the experiment is to demonstrate the concept of ionization cooling for a beam of muons, crucial for the requirements of a Neutrino Factory and a Muon Collider. Muon cooling is achieved by measuring the reduction of the four dimensional transverse emittance for a beam of muons passing through low density absorbers and then accelerating the longitudinal component of the momentum using RF cavities. The absorbers are maintained in a focusing magnetic field to reduce the beta function of the beam and the RF cavities are kept inside coupling coils. The main goal of MICE is to measure a fractional drop in emittance, of order -10% for large emittance beams, with an accuracy of 1%(which imposes a requirement that the absolute emittance be measured with an accuracy of 0.1%). This paper will discuss the status of MICE, including the progress in commissioning the muon beam line at the ISIS accelerator at RAL, the construction of the different detector elements in MICE and the prospects for the future.

  4. Special Status Species | Open Energy Information

    Open Energy Info (EERE)

    Status Species Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleSpecialStatusSpecies&oldid647804" Feedback Contact needs updating Image...

  5. Machine Status and Schedule | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    @apsnotify on Twitter | RSS feed Email lists: APS Notify | XRAYOPS APSStatus App: Android Beamline Status Beamline Status Beam Properties Beam Properties Storage Ring...

  6. Machine Status | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Support User Support Machine Status Presentations Training & Outreach User Survey Machine Status MIRA 0 CETUS 0 VESTA 0 TUKEY 0

  7. Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Rigsby V.P.

    2009-02-12

    In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Bui

  8. Status of Hydrogen Storage Technologies

    Broader source: Energy.gov [DOE]

    The current status in terms of weight, volume, and cost of various hydrogen storage technologies is shown below. These values are estimates from storage system developers and the R&D community...

  9. Plant Operational Status - Pantex Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plant Operational Status Plant Operational Status Page Content Shift 1 - Day The Pantex Plant is open for normal Day Shift operations. Plant personnel are to report as assigned. Personnel may call 477-3000, Option 1 for additional details. Shift 2 - Swing The Pantex Plant is open for normal Swing Shift operations. Plant personnel are to report as assigned. Personnel may call 477-3000, Option 1 for additional details. Shift 3 - Grave The Pantex Plant is open for normal Graveyard Shift operations.

  10. Property:BLM CaseStatus | Open Energy Information

    Open Energy Info (EERE)

    Relinquished Withdrawn Subproperties This property has the following 5 subproperties: C CACA-005224 N NVN-075549 NVN-076209 NVN-076822 NVN-076825 Pages using the property "BLM...

  11. VPP Participant Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Participant Status VPP Participant Status July 2015 The VPP Participants Status Table represents the current status of the DOE contractors with the DOE VPP Program. The table describes the level of accomplishment of each participant within the VPP Program along with NAICS code, employee population, program office lead, and upcoming reviews schedule. File VPP Participants Status Update July 21, 2015 Rev. 14 More Documents & Publications Voluntary Protection Program Onsite Review, Hanford

  12. Document Status & Schedules | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Document Status & Schedules Document Status & Schedules Schedules of Key Environmental Impact Statements This document graphically displays the milestone dates and projected schedules of key Environmental Impact Statements (updated monthly). Environmental Impact Statement and Environmental Assessment Status Chart The Status Chart provides the status of ongoing NEPA documents at the Department of Energy including the dates of important milestones in the NEPA process and references to more

  13. Case Studies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OSCARS Case Studies Science DMZ Case Studies Multi-facility Workflow Case Study News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog...

  14. Industrial demand side management: A status report

    SciTech Connect (OSTI)

    Hopkins, M.F.; Conger, R.L.; Foley, T.J.

    1995-05-01

    This report provides an overview of and rationale for industrial demand side management (DSM) programs. Benefits and barriers are described, and data from the Manufacturing Energy Consumption Survey are used to estimate potential energy savings in kilowatt hours. The report presents types and examples of programs and explores elements of successful programs. Two in-depth case studies (from Boise Cascade and Eli Lilly and Company) illustrate two types of effective DSM programs. Interviews with staff from state public utility commissions indicate the current thinking about the status and future of industrial DSM programs. A comprehensive bibliography is included, technical assistance programs are listed and described, and a methodology for evaluating potential or actual savings from projects is delineated.

  15. Foreign Obligations Implementation Status Presentation

    National Nuclear Security Administration (NNSA)

    January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, Georgia Georgia Obligations Accounting Implementation Workshop Obligations Accounting Implementation Workshop Foreign Obligations Implementation Status Brian G. Horn U.S. Nuclear Regulatory Commission January 13, 2004 Obligations Accounting Implementation Workshop January 13, 2 Obligations Accounting Implementation Workshop January 13, 2004 Crowne Plaza Ravinia Atlanta, GA 004 Crowne Plaza Ravinia

  16. NVN-083930 | Open Energy Information

    Open Energy Info (EERE)

    Type Lot Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 4291.68 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT...

  17. AZA-009172 | Open Energy Information

    Open Energy Info (EERE)

    Lot Case Status Closed Case Type GEOLSENONCOMPPRE2005 Total Acreage 2220.99 Bid PriceAcre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT...

  18. NVN-085726 | Open Energy Information

    Open Energy Info (EERE)

    Type Lot Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 4435.6 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee...

  19. NVN-077739 | Open Energy Information

    Open Energy Info (EERE)

    Lot Case Status Authorized Case Type GEOLSENONCOMPPRE2005 Total Acreage 1271.82 Bid PriceAcre Managing Field Office none provided Surface Manager TOIYABE NF Lessee 1 PATUA...

  20. NVN-084604X | Open Energy Information

    Open Energy Info (EERE)

    Type Lot Case Status Closed Case Type GEOUNITAGREEMENT Total Acreage 15294.14 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

  1. NVN-086899 | Open Energy Information

    Open Energy Info (EERE)

    Lot Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 3810.02 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

  2. NVN-088416 | Open Energy Information

    Open Energy Info (EERE)

    Lot Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 1263.23 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

  3. NVN-086871 | Open Energy Information

    Open Energy Info (EERE)

    Lot Case Status Authorized Case Type GEOLSECOMPPOST2005 Total Acreage 3113.88 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

  4. AZA-009173 | Open Energy Information

    Open Energy Info (EERE)

    Lot Case Status Closed Case Type GEOLSENONCOMPPRE2005 Total Acreage 2503.48 Bid PriceAcre Managing Field Office none provided Surface Manager FOREST SERVICE Lessee 1 HUNT...

  5. NVN-076298 | Open Energy Information

    Open Energy Info (EERE)

    Lot Case Status Authorized Case Type GEOLEASECOMPETITIVE Total Acreage 1912.02 Bid PriceAcre Managing Field Office none provided Surface Manager BUREAU OF LAND MGMT Lessee 1...

  6. Generic Photovoltaic System Models for WECC - A Status Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generic Photovoltaic System Models for WECC - A Status Report WECC Renewable Energy Modeling Task Force Abstract - This paper describes generic models of photovoltaic (PV) systems developed for implementation in Western Electric Coordinating Council (WECC) base cases. The scope encompasses both transmission-connected, central station PV plants and distributed PV systems. These models were added to the WECC Approved Dynamic Model Library in March of 2014. Index Terms - Distributed generation,

  7. Complete LNG Terminal Status Maps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complete LNG Terminal Status Maps Complete LNG Terminal Status Maps A series of slides showing the status of various LNG terminals (existing, under construction, proposed, etc.) in...

  8. Advanced Collaborative Emissions Study (ACES): Phase 2 Status...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Phase 2 Status Report Advanced Collaborative Emissions Study (ACES): Phase 2 Status Report Discusses status of ACES, a cooperative multi-party effort to characterize emissions ...

  9. ARM - Value-Added Product Status Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Reports Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library Videos...

  10. WIPP Status Update | Department of Energy

    Office of Environmental Management (EM)

    Status Update WIPP Status Update Presentation made by Bill Mackie for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY. PDF icon WIPP Status Update More Documents & Publications EIS-0026-SA-08: Supplemental Analysis Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH TRAMPAC) Central Characterization Program (CCP) Transuranic Authorized Methods for Payload Control

  11. SuperNEMO Project Status

    SciTech Connect (OSTI)

    Chauveau, E. [Universite de Bordeaux, Centre d'Etudes Nucleaires de Bordeaux Gradignan, UMR 5797, F-33175 Gradignan (France) and CNRS/IN2P3, Centre d'Etudes Nucleaires de Bordeaux Gradignan, UMR 5797, F-33175 Gradignan (France)

    2009-11-09

    The SuperNEMO experiment aims to reach a sensitivity up to 10{sup 26} years on the half-life of neutrinoless double beta decay. The chosen way is to build a 'tracko-calo' detector with at least 100 kg of betabeta isotope. The current status of the main R and D tasks will be presented: enrichment and production of source foil, radiopurity control, tracker and calorimeter.

  12. KTM Experimental Complex Project Status

    SciTech Connect (OSTI)

    Tazhibayeva, I.L.; Azizov, E.A.; Krylov, V.A.; Shkolnik, V.S.; Velikhov, E.P.; Obysov, N.A.; Tukhvatulin, Sh.T.; Tikhomirov, L.N.; Shestakov, V.P.; Filatov, O.G

    2005-04-15

    A review of KTM experimental complex project status, which is aimed the creation of a Kazakhstani spherical tokamak for study and tests materials and components of future fusion reactors. Revised basic parameters of the KTM facility and ground of the changes taking into account new plasma core geometry, new design of vacuum chamber and modified magnetic system, transport sluice and movable divertor devices, and additional RF-heating system are presented here.

  13. DOE Workshop - Deposition Velocity Status

    Office of Environmental Management (EM)

    Safely Delivering DOE's Vision for the East Tennessee Technology Park Mission Safely Delivering the Department of Energy's Vision for the East Tennessee Technology Park Mission DOE Workshop Deposition Velocity Status Mike Hitchler, Manager Nuclear Facility Safety June 5, 2012 Safely Delivering DOE's Vision for the East Tennessee Technology Park Mission Existing UCOR Analyses * UCOR facilities at East Tennessee Technology Park (ETTP) and Oak Ridge National Laboratory (ORNL) use various plume

  14. Status of Energy in Nevada

    National Nuclear Security Administration (NNSA)

    gallons Office of the Governor Nevada State Office of Energy 2008 STATUS OF ENERGY IN NEVADA REPORT PAGE 15 Glossary of Acronyms, Terms, Definitions & Conversion Factors Glossary of Acronyms and Terms ACLM - Air conditioning Load Management APS - Arizona Public Service bbl/day - barrels per day Bcf - Billion cubic feet Bcf/d - Billion cubic feet per day BLM - Bureau of Land Management BPA - Bonneville Power Administration CAFÉ - Corporate Average Fuel Economy CAISO - California Independent

  15. Status of Energy in Nevada

    National Nuclear Security Administration (NNSA)

    gallons 0 200 400 600 800 1000 1200 1400 Gasoline Diesel Jet Fuel Alternative Fuel Aviation Gas Gallons in millions 2008 Transportation Fuel by Type, gallons in millions Office of the Governor Nevada State Office of Energy 2008 STATUS OF ENERGY IN NEVADA REPORT PAGE 15 Glossary of Acronyms, Terms, Definitions & Conversion Factors Glossary of Acronyms and Terms ACLM - Air conditioning Load Management APS - Arizona Public Service bbl/day - barrels per day Bcf - Billion cubic feet Bcf/d -

  16. Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 FOIA - Request Log 1 Closed/ Date No. Dated Date Rec'd HQ or Dir. Subject Finalized 05/19/09 001 04/07/09 04/07/09 Direct Current contracts with Visionary Solutions, LLC and CAST Specialty Transportation Incorporated, for transportation services for the Waste Isolation Pilot Plant (WIPP) Finalized 06/30/09 002 06/29/09 06/29/09 Transfer DOE/HQ (1) All documents dated from February 2001 to the present relating or referring to any labor disputes that have delayed completion of federal

  17. Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for contract years 2009, 200S, 2007, 2006, 2005 for the following DOE prime contracts. WTS - WIPP Carlsbad, NM CWI - Idaho Cleanup Project (ICP) WVES - Interim Ends State...

  18. Case Studies

    Broader source: Energy.gov [DOE]

    The following case studies are examples of integrating renewable energy into Federal new construction and major renovation projects. Additional renewable energy case studies are also available.

  19. Status of LLNL granite projects

    SciTech Connect (OSTI)

    Ramspott, L.D.

    1980-12-31

    The status of LLNL Projects dealing with nuclear waste disposal in granitic rocks is reviewed. This review covers work done subsequent to the June 1979 Workshop on Thermomechanical Modeling for a Hardrock Waste Repository and is prepared for the July 1980 Workshop on Thermomechanical-Hydrochemical Modeling for a Hardrock Waste Repository. Topics reviewed include laboratory determination of thermal, mechanical, and transport properties of rocks at conditions simulating a deep geologic repository, and field testing at the Climax granitic stock at the USDOE Nevada Test Site.

  20. Oil shale: Technology status report

    SciTech Connect (OSTI)

    Not Available

    1986-10-01

    This report documents the status of the US Department of Energy's (DOE) Oil Shale Program as of the end of FY 86. The report consists of (1) a status of oil shale development, (2) a description of the DOE Oil Shale Program, (3) an FY 86 oil shale research summary, and (4) a summary of FY 86 accomplishments. Discoveries were made in FY 86 about the physical and chemical properties and behavior of oil shales, process chemistry and kinetics, in situ retorting, advanced processes, and the environmental behavior and fate of wastes. The DOE Oil Shale Program shows an increasing emphasis on eastern US oil shales and in the development of advanced oil shale processing concepts. With the award to Foster Wheeler for the design of oil shale conceptual plants, the first step in the development of a systems analysis capability for the complete oil shale process has been taken. Unocal's Parachute Creek project, the only commercial oil shale plant operating in the United States, is operating at about 4000 bbl/day. The shale oil is upgraded at Parachute Creek for input to a conventional refinery. 67 refs., 21 figs., 3 tabs.

  1. Outreach and Collaboration Program Status and Accomplishments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2008-2009 More Documents & Publications Outreach and Collaboration Functional Area Analysis Report Focus Group Meeting (Activities Status) Focus Group Meeting (Topical Wrap-Up

  2. Molecular catalytic coal liquid conversion. Quarterly status...

    Office of Scientific and Technical Information (OSTI)

    report Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly status report In this Quarter, the research was focused continually on the...

  3. Molecular catalytic coal liquid conversion. Quarterly status...

    Office of Scientific and Technical Information (OSTI)

    July--September 1995 Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly status report, July--September 1995 The research was...

  4. Molecular catalytic coal liquid conversion. Quarterly status...

    Office of Scientific and Technical Information (OSTI)

    July--September 1995 Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly status report, July--September 1995 You are accessing...

  5. Molecular catalytic coal liquid conversion. Quarterly status...

    Office of Scientific and Technical Information (OSTI)

    report Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly status report You are accessing a document from the Department of...

  6. Case Studies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Case Studies Case Studies The following case studies will be included in the HEP report. Final case studies are due January 7, 2013. Lattice Gauge Theories - Lead: Doug Toussaint Simulations for Cosmic Frontier Experiments - Leads: Peter Nugent & Andrew Connelly Cosmic Microwave Background Data Analysis - Lead: Julian Borrill Cosmological Simulations - Lead: Salman Habib Plasma Accelerator Simulation Using Laser and Particle Beam Drivers - Leads: Cameron Geddes & Frank Tsung Community

  7. In Case of Difficulty Accessing PDSF or HPSS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In Case of Difficulty Accessing PDSF or HPSS In Case of Difficulty Accessing PDSF or HPSS NERSC Systems Status - includes PDSF and HPSS status as well as the the Message of the Day (MOTD) and is maintained 24 hours a day, 7 days a week, by the NERSC Computer Operations & Network Support staff and provides the most up-to-date information on system status. NERSC Systems Availability Log - includes HPSS and PDSF. History of down times for all the NERSC systems - updated once a day. This is a

  8. ACRF Ingest Software Status: New, Current, and Future - June 2008

    SciTech Connect (OSTI)

    AS Koontz; S Choudhury; BD Ermold; NN Keck; KL Gaustad; RC Perez

    2008-06-01

    The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF). The report is divided into 4 sections: (1) for news about ingests currently under development, (2) for current production ingests, (3) for future ingest development plans, and (4) for information on retired ingests. Please note that datastreams beginning in xxx indicate cases where ingests run at multiple ACRF sites, which results in a datastream(s) for each location.

  9. Credentialing: What's in a Name? A Lot

    Broader source: Energy.gov [DOE]

    This article discusses the various types of credentials for solar installers, and clears up misunderstandings of the terms certification, certificate, accreditation, and licensure.

  10. LOT Vacuum Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    manufacturer for semiconductors, specifically vacuum pumps; supplies to Oerlikon and Samsung Electronics for solar-use. Coordinates: 37.019451, 127.315132 Show Map Loading...

  11. LOT Oriel Group | Open Energy Information

    Open Energy Info (EERE)

    Oriel is an independent distributor of surface analysis, spectroscopy and imaging instrumentation. Coordinates: 45.468945, 9.18103 Show Map Loading map......

  12. Monthly Status Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Monthly Status Reports Monthly Status Reports Active Project Justification Statement Project Registration Number Assignments (Active) All Active DOE Technical Standards Document Project Registration Number Assignments (Completed) The Proposed Reaffirmations and Cancellations For Additional Information Contact: Jeffrey Feit phone: 301-903-0471 e-mail: jeffrey.feit@hq.doe.gov

  13. Fuel Cell Development Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development Status Fuel Cell Development Status Presented at the DOE-DOD Shipboard APU Workshop on March 29, 2011. PDF icon apu2011_7_short.pdf More Documents & Publications PAFC History and Successes MCFC and PAFC R&D Workshop Summary Report PAFC Cost Challenges

  14. DFC Technology Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Status DFC Technology Status Presentation at the MCFC and PAFC R&D Workshop, Nov. 16, 2009 PDF icon mcfc_pafc_workshop_patel.pdf More Documents & Publications Fuel Cell Power Plants Renewable and Waste Fuels Co-production of Hydrogen and Electricity (A Developer's Perspective) MCFC and PAFC R&D Workshop Summary Report

  15. Workforce Retention Work Group Status Overview - July 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy July 2012 Workforce Retention Work Group Status Overview - July 2012 Documents Available for Download PDF icon July 2012 Status Overviews More Documents & Publications Workforce Retention Work Group Status Overview - September 2012 Strategic Initiatives Work Group Status Overview - July 2012 10 CFR 851 Work Group Status Overview - July 2012

  16. Strategic Initiatives Work Group Status Overview - July 2012 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy July 2012 Strategic Initiatives Work Group Status Overview - July 2012 Documents Available for Download PDF icon July 2012 Status Overviews More Documents & Publications Strategic Initiatives Work Group Status Overview - September 2012 10 CFR 851 Work Group Status Overview - July 2012 Workforce Retention Work Group Status Overview - July 2012

  17. Contractor Earned Value Management System Certification Status | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Earned Value Management System Certification Status Contractor Earned Value Management System Certification Status Certification Status for major EM Contracts PDF icon Contractor Earned Value Management System Certification Status More Documents & Publications VPP Participant Status EM Major Contracts Awarded Since 2006 DOE Site Facility Management Contracts Internet Posting

  18. Waste Isolation Pilot Plant Status and Plans - 2010 | Department...

    Office of Environmental Management (EM)

    Status and Plans - 2010 Waste Isolation Pilot Plant Status and Plans - 2010 Overview of WIPP presented by Dr. Dave Moody. Waste Isolation Pilot Plant Status and Plans - 2010 More...

  19. Training Work Group Status Overview - July 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2012 Training Work Group Status Overview - July 2012 Documents Available for Download PDF icon July 2012 Status Overviews More Documents & Publications Training Work Group Status Overview - September

  20. Training Work Group Status Overview - September 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2012 Training Work Group Status Overview - September 2012 Documents Available for Download PDF icon September 2012 Status Overviews More Documents & Publications Training Work Group Status Overview - July

  1. CHAPS: status of issues and action items

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2007 CHAPS: status of issues and action items. Items to watch are shown in bold. 1. Our most recent 'off-line' conference call was on March 30, with Yin-Nan, Liz, John J. Betsy, and John H. Details of AMS plumbing were discussed. 2. Status of CVI: a. It has been installed and test flown, 3/14 & 3/16. b. We are working on an instability in one of the flow meters (feedback with the zero-air regulator?) c. Will be flown again with nephs and psaps, and again with AMS d. See full status of

  2. I/O Case Studies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (>10%) dealing IO related to the tecplot files Frequent OpenSeekClose uses lots of meta time Meta time is 50X of the actual write time Suggestion KEEP the file open saves 90%...

  3. NAFTA Heavy Duty Engine and Aftertreatment Technology: Status...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NAFTA Heavy Duty Engine and Aftertreatment Technology: Status and Outlook NAFTA Heavy Duty Engine and Aftertreatment Technology: Status and Outlook Presentation given at DEER 2006, ...

  4. Reorganization Status of the Office of Energy Efficiency and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Status of the Office of Energy Efficiency and Renewable Energy: Panel Observations Reorganization Status of the Office of Energy Efficiency and Renewable Energy: Panel Observations ...

  5. Candidate and Special Status Species | Open Energy Information

    Open Energy Info (EERE)

    Status Species Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleCandidateandSpecialStatusSpecies&oldid612384" Feedback Contact needs...

  6. EV Everywhere Grand Challenge - Battery Status and Cost Reduction...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Status and Cost Reduction Prospects EV Everywhere Grand Challenge - Battery Status and Cost Reduction Prospects Presentation given by technology manager David Howell at the EV...

  7. The Status of Renewable Hydrogen and Energy Station Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Status of Renewable Hydrogen and Energy Station Technologies and Policy Recommendations The Status of Renewable Hydrogen and Energy Station Technologies and Policy...

  8. Thailand-Status and Potential for the Development of Biofuels...

    Open Energy Info (EERE)

    Status and Potential for the Development of Biofuels and Rural Renewable Energy Jump to: navigation, search Name Thailand-Status and Potential for the Development of Biofuels and...

  9. Indonesia and Climate Change: Current Status and Policies | Open...

    Open Energy Info (EERE)

    Indonesia and Climate Change: Current Status and Policies Jump to: navigation, search Name Indonesia and Climate Change: Current Status and Policies AgencyCompany Organization...

  10. Focus Group Meeting (Activities Status) | Department of Energy

    Energy Savers [EERE]

    Activities Status) Focus Group Meeting (Activities Status) Meeting Date: January 20, 2011 The primary purpose of the January 20 Focus Group Meeting was to review the most recent...

  11. WIPP Update and Status of Recovery | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    WIPP Update and Status of Recovery More Documents & Publications WIPP Recovery Information Waste Isolation Pilot Plant Update and Status of Recovery Waste Isolation Pilot Plant...

  12. Status of the MAJORANA DEMONSTRATOR: A Search for Neutrinoless...

    Office of Scientific and Technical Information (OSTI)

    Status of the MAJORANA DEMONSTRATOR: A Search for Neutrinoless Double-Beta Decay Citation Details In-Document Search Title: Status of the MAJORANA DEMONSTRATOR: A Search for...

  13. 3-D Combustion Simulation Strategy Status, Future Potential,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combustion Simulation Strategy Status, Future Potential, and Application Issues 3-D Combustion Simulation Strategy Status, Future Potential, and Application Issues 2004 Diesel...

  14. Current Status of the Spent Nuclear Fuel Management Program in...

    Office of Scientific and Technical Information (OSTI)

    Current Status of the Spent Nuclear Fuel Management Program in the United States. Citation Details In-Document Search Title: Current Status of the Spent Nuclear Fuel Management...

  15. Status of Heavy-lepton Searches

    DOE R&D Accomplishments [OSTI]

    Perl, M. L.

    1981-06-01

    Searches for heavy leptons using e{sup +}e{sup -} annihilation, lepton-hadron collisions, photon-hadron collisions, hadron-hadron collisions, and studies of macroscopic matter are reviewed. The present experimental status and future possibilities are summarized.

  16. Status of the MAJORANA DEMONSTRATOR experiment

    SciTech Connect (OSTI)

    Martin, R. D.; Abgrall, N.; Aguayo, Estanislao; Avignone, F. T.; Barabash, Alexander S.; Bertrand, F.; Boswell, M.; Brudanin, V.; Busch, Matthew; Caldwell, A. S.; Chan, Yuen-Dat; Christofferson, Cabot-Ann; Combs, Dustin C.; Detwiler, Jason A.; Doe, P. J.; Efremenko, Yuri; Egorov, Viatcheslav; Ejiri, H.; Elliott, S.; Esterline, James H.; Fast, James E.; Finnerty, P.; Fraenkle, Florian; Galindo-Uribarri, A.; Giovanetti, G. K.; Goett, J.; Green, M.; Gruszko, J.; Guiseppe, Vincente; Gusev, K.; Hallin, A. L.; Hazama, R.; Hegai, A.; Henning, R.; Hoppe, Eric W.; Howard, Stanley; Howe, M. A.; Keeter, K.; Kidd, M. F.; Kochetov, Oleg; Konovalov, S.; Kouzes, Richard T.; LaFerriere, Brian D.; Leon, Jonathan D.; Leviner, L.; Loach, J. C.; MacMullin, J.; MacMullin, S.; Mertens, S.; Mizouni, Leila; Nomachi, Masaharu; Orrell, John L.; O'Shaughnessy, Mark D.; Overman, Nicole R.; Phillips, David; Poon, Alan; Pushkin, K.; Radford, D. C.; Rielage, Keith; Robertson, R. G. H.; Romero-Romero, E.; Ronquest, M. C.; Schubert, Alexis G.; Shanks, B.; Shima, T.; Shirchenko, M.; Snavely, Kyle J.; Snyder, N.; Soin, Aleksandr; Suriano, Anne-Marie; Thompson, J.; Timkin, V.; Tornow, W.; Varner, R. L.; Vasilyev, Sergey; Vetter, Kai; Vorren, Kris R.; White, Brandon R.; Wilkerson, J. F.; Xu, W.; Yakushev, E.; Young, A.; Yu, Chang-Hong; Yumatov, Vladimir

    2014-07-08

    The MAJORANA DEMONSTRATOR neutrinoless double beta-decay experiment is currently under construction at the Sanford Underground Research Facility in South Dakota, USA. An overview and status of the experiment are given.

  17. Status of the MAJORANA DEMONSTRATOR experiment

    SciTech Connect (OSTI)

    Martin, R. D. [Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, CA, USA and Department of Physics, University of South Dakota, Vermillion, SD (United States); Abgrall, N.; Chan, Y-D.; Hegai, A.; Mertens, S.; Poon, A. W. P.; Vetter, K. [Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, CA (United States); Aguayo, E.; Fast, J. E.; Hoppe, E. W.; Kouzes, R. T.; LaFerriere, B. D.; Orrell, J. L.; Overman, N. R.; Soin, A. [Pacific Northwest National Laboratory, Richland, WA (United States); Avignone III, F. T. [Department of Physics and Astronomy, University of South Carolina, Columbia, SC, USA and Oak Ridge National Laboratory, Oak Ridge, TN (United States); Barabash, A. S.; Konovalov, S. I.; Yumatov, V. [Institute for Theoretical and Experimental Physics, Moscow (Russian Federation); Bertrand, F. E. [Oak Ridge National Laboratory, Oak Ridge, TN (United States); and others

    2014-06-24

    The MAJORANA DEMONSTRATOR neutrinoless double beta-decay experiment is currently under construction at the Sanford Underground Research Facility in South Dakota, USA. An overview and status of the experiment are given.

  18. National Hydrogen Learning Demonstration Status (Presentation)

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

    2012-02-01

    This presentation discusses U.S. DOE Learning Demonstration Project goals, fuel cell vehicle and H2 station deployment status, and technical highlights of vehicle and infrastructure analysis results and progress.

  19. ILDG Middleware Working Group Status Report

    SciTech Connect (OSTI)

    B. Joo; W. Watson

    2004-09-01

    We report on the status of the ILDG Middleware Working Group. The Middleware Working Group was formed with the aim of designing standard middleware to allow the interoperation of the data grids of ILDG member collaborations. Details of the working group are given. In this contribution we outline the role of middleware in the ILDG, present our proposed middleware architecture and discuss our current status and future work within the working group.

  20. Status of Laboratory Goals | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status of Laboratory Goals Status of Calendar Year 2015 objectives and targets. Item 1: The EMSSC recommends creating a list of excess property and posting it on the Laboratory's webpage by April 1, 2015. Such a list will allow staff to view Laboratory assets that are available for free reuse for Laboratory purposes. This target has been met. The Ames Laboratory encompasses all the aspects of the Site Sustainability Plan into the Laboratory's efforts to meet DOE's sustainability goals. See the

  1. Generalized parton distributions: Status and perspectives (Conference) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Generalized parton distributions: Status and perspectives Citation Details In-Document Search Title: Generalized parton distributions: Status and perspectives We summarize recent developments in understanding the concept of generalized parton distributions (GPDs), its relation to nucleon structure, and its application to high-Q^2 electroproduction processes. Following a brief review of QCD factorization and transverse nucleon structure, we discuss (a) new theoretical methods

  2. ARM - Value-Added Products - Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - Status Report Expand Orange | Expand Blue | Expand Green | Collapse All See Legend for Data Availability explanation. ARM - Value-Added Products - Status Last Update: February 11 2016 23:53:54 +/- Vap Name Translator Developer Frequency Tier Producer Data Availability ACRED (ARM Cloud Retrieval Ensemble Data) Shaocheng Xie Chuanfeng Zhao, Renata Mc Coy Periodically Evaluation Developer ARM Overview: Developer Description: The ARM Cloud Retrieval Ensemble Dataset (ACRED) is a multi-year cloud

  3. Strategic Initiatives Work Group Status Overview - September 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy September 2012 Strategic Initiatives Work Group Status Overview - September 2012 Documents Available for Download PDF icon September 2012 Status Overviews More Documents & Publications Strategic Initiatives Work Group Status Overview - July 2012 Focus Group Meeting (Activities Status) Focus Group Meeting (Topical Wrap-Up)

  4. Status and Impacts of State MTBE Bans

    Reports and Publications (EIA)

    2003-01-01

    This paper describes legislation passed in 16 states banning or restricting the use of methyl tertiary butyl ether (MTBE) in gasoline. Analysis of the status and impact of these state MTBE bans is provided concerning the supply and potential price changes of gasoline.

  5. STATUS OF THE NRC'S DECOMMISSIONING PROGRAM

    SciTech Connect (OSTI)

    Orlando, D. A.; Camper, L. W.; Buckley, J.

    2002-02-25

    On July 21, 1997, the U.S. Nuclear Regulatory Commission published the final rule on Radiological Criteria for License Termination (the License Termination Rule) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program. It discusses the status of permanently shut-down commercial power reactors, complex decommissioning sites, and sites listed in the Site Decommissioning Management Plan. The paper provides the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including a Standard Review Plan for evaluating plans and information submitted by licensees to support the decommissioning of nuclear facilities and the D and D Screen software for determining the potential doses from residual radioactivity. Finally, it discusses the status of the staff's current efforts to streamline the decommissioning process.

  6. Status of the NRC Decommissioning Program

    SciTech Connect (OSTI)

    Orlando, D. A.; Camper, L.; Buckley, J.; Pogue, E.; Banovac, K.

    2003-02-24

    On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.

  7. Technology status and project development risks of advanced coal power generation technologies in APEC developing economies

    SciTech Connect (OSTI)

    Lusica, N.; Xie, T.; Lu, T.

    2008-10-15

    The report reviews the current status of IGCC and supercritical/ultrasupercritical pulverized-coal power plants and summarizes risks associated with project development, construction and operation. The report includes an economic analysis using three case studies of Chinese projects; a supercritical PC, an ultrasupercritical PC, and an IGCC plant. The analysis discusses barriers to clean coal technologies and ways to encourage their adoption for new power plants. 25 figs., 25 tabs.

  8. Green Power Marketing in the United States: A Status Report ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Green Power Marketing in the United States: A Status Report (11th Edition) Green Power Marketing in the United States: A Status Report (11th Edition) This report documents green ...

  9. Focus Group Meeting (Activities Status) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Focus Group Meeting (Activities Status) Focus Group Meeting (Activities Status) Meeting Date: January 20, 2011 The primary purpose of the January 20 Focus Group Meeting was to review the most recent status of health, safety and security improvement activities, and to identify 2011 strategic path forward. Documents Available for Download PDF icon Meeting Agenda PDF icon Meeting Summary PDF icon Meeting Participants More Documents & Publications Focus Group Meeting (Activities Status) Work

  10. Presentation to EAC: Renewable Electricity Futures Activities & Status,

    Energy Savers [EERE]

    October 29, 2010 | Department of Energy Presentation to EAC: Renewable Electricity Futures Activities & Status, October 29, 2010 Presentation to EAC: Renewable Electricity Futures Activities & Status, October 29, 2010 Presentation to the Electricity Advisory Committee, October 29, 2010, on Renewable Electricity Futures Activities & Status. The presentation provides a high-level overview of the Renewable Electricity Futures study, its current status, modeling approach, and key

  11. Acquisition & Financial Assistance Rules Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition & Financial Assistance Rules Status Acquisition & Financial Assistance Rules Status Subscribe to Acquisition & Financial Assistance Rules Status Updates PDF icon Acquisition & Financial Assistance Rules Status_Oct_2015.pdf More Documents & Publications Policy Flash 2013-23 Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT

  12. FTCP Senior Technical Safety Manager (STSM) Status Report | Department of

    Office of Environmental Management (EM)

    Energy Senior Technical Safety Manager (STSM) Status Report FTCP Senior Technical Safety Manager (STSM) Status Report List of Senior Technical Safety Manager Positions, Base Requirements, Compensatory Measures and Qualification Status. PDF icon STSM Status Report More Documents & Publications Technical Qualification Program Self-Assessment Report - Richland Operations Office - 2014 FTCP Quarterly Report on Federal Technical Capability, February 24, 2014 Senior Technical Safety Manager

  13. Environmental Impact Statements and Environmental Assessments Status Chart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the status of ongoing NEPA documents at the Department of Energy, including the dates of important milestones in the NEPA process, links to the project pages, and references to more information (updated monthly). This chart represents anticipated activity and is not a commitment for documentation

  14. Alternative Fuels Data Center: Status Update: E85 Dispenser System

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Certified (June 2010) E85 Dispenser System Certified (June 2010) to someone by E-mail Share Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Facebook Tweet about Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Twitter Bookmark Alternative Fuels Data Center: Status Update: E85 Dispenser System Certified (June 2010) on Google Bookmark Alternative Fuels Data Center: Status Update: E85 Dispenser System

  15. Alternative Fuels Data Center: Status Update: Requirements Have Not Changed

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    (June 2008) Requirements Have Not Changed (June 2008) to someone by E-mail Share Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Facebook Tweet about Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Twitter Bookmark Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008) on Google Bookmark Alternative Fuels Data Center: Status Update: Requirements Have Not Changed (June 2008)

  16. Status and Future of TRANSCOM | Department of Energy

    Office of Environmental Management (EM)

    and Future of TRANSCOM Status and Future of TRANSCOM Current Program Status Upcoming Changes Glimpse at Future Options DOE Commitments PDF icon Status and Future of TRANSCOM More Documents & Publications Applying Risk Communication to the Transportation of Radioactive Materials Department of Energy Office of Science Transportation Overview NTSF Spring 2010 Final Agenda

  17. Workforce Retention Work Group Status Overview - September 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy September 2012 Workforce Retention Work Group Status Overview - September 2012 Documents Available for Download PDF icon September 2012 Status Overviews More Documents & Publications Workforce Retention Work Group Status Overview - July 2012 Work Force Retention Work Group Charter Work Group Telecon (Final Charters)

  18. Fossil energy waste management. Technology status report

    SciTech Connect (OSTI)

    Bossart, S.J.; Newman, D.A.

    1995-02-01

    This report describes the current status and recent accomplishments of the Fossil Energy Waste Management (FE WM) projects sponsored by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The primary goal of the Waste Management Program is to identify and develop optimal strategies to manage solid by-products from advanced coal technologies for the purpose of ensuring the competitiveness of advanced coal technologies as a future energy source. The projects in the Fossil Energy Waste Management Program are divided into three types of activities: Waste Characterization, Disposal Technologies, and Utilization Technologies. This technology status report includes a discussion on barriers to increased use of coal by-products. Also, the major technical and nontechnical challenges currently being addressed by the FE WM program are discussed. A bibliography of 96 citations and a list of project contacts is included if the reader is interested in obtaining additional information about the FE WM program.

  19. Annual Hanford Site Environmental Permitting Status Report

    SciTech Connect (OSTI)

    HOMAN, N.A.

    2000-10-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year.

  20. Smart Grid Status and Metrics Report Appendices

    SciTech Connect (OSTI)

    Balducci, Patrick J.; Antonopoulos, Chrissi A.; Clements, Samuel L.; Gorrissen, Willy J.; Kirkham, Harold; Ruiz, Kathleen A.; Smith, David L.; Weimar, Mark R.; Gardner, Chris; Varney, Jeff

    2014-07-01

    A smart grid uses digital power control and communication technology to improve the reliability, security, flexibility, and efficiency of the electric system, from large generation through the delivery systems to electricity consumers and a growing number of distributed generation and storage resources. To convey progress made in achieving the vision of a smart grid, this report uses a set of six characteristics derived from the National Energy Technology Laboratory Modern Grid Strategy. The Smart Grid Status and Metrics Report defines and examines 21 metrics that collectively provide insight into the grid’s capacity to embody these characteristics. This appendix presents papers covering each of the 21 metrics identified in Section 2.1 of the Smart Grid Status and Metrics Report. These metric papers were prepared in advance of the main body of the report and collectively form its informational backbone.

  1. ACRF Instrumentation Status and Information - June 2009

    SciTech Connect (OSTI)

    JW Voyles

    2009-06-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  2. ACRF Instrumentation Status and Information July 2009

    SciTech Connect (OSTI)

    JW Voyles

    2009-08-13

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  3. ACRF Instrumentation Status and Information April 2009

    SciTech Connect (OSTI)

    JW Voyles

    2009-05-07

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  4. ACRF Instrumentation Status and Information September 2009

    SciTech Connect (OSTI)

    JW Voyles

    2009-10-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  5. ACRF Instrumentation Status and Information May 2009

    SciTech Connect (OSTI)

    JW Voyles

    2009-05-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  6. ACRF Instrumentation Status and Information August 2009

    SciTech Connect (OSTI)

    JW Voyles

    2009-09-09

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  7. Smart Grid Status and Metrics Report

    SciTech Connect (OSTI)

    Balducci, Patrick J.; Weimar, Mark R.; Kirkham, Harold

    2014-07-01

    To convey progress made in achieving the vision of a smart grid, this report uses a set of six characteristics derived from the National Energy Technology Laboratory Modern Grid Strategy. It measures 21 metrics to provide insight into the grid’s capacity to embody these characteristics. This report looks across a spectrum of smart grid concerns to measure the status of smart grid deployment and impacts.

  8. Update on Status of SEP National Evaluation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Update for State Energy Advisory Board on Status of SEP National Evaluation Martin Schweitzer Oak Ridge National Laboratory June 26, 2012 Managed by UT-Battelle for the Department of Energy Introduction * Study is being performed by independent evaluation team (KEMA, Inc. and subcontractors) and managed by ORNL * Will quantify energy and cost savings, job creation, renewable energy generation, and carbon emissions reductions * Covers program year 2008 and ARRA period 2 Managed by UT-Battelle for

  9. Status Update: Closing Rocky Flats by 2006

    SciTech Connect (OSTI)

    Tuor, N.; Schubert, A.

    2003-02-25

    Safely closing Rocky Flats by December 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy (DOE), Kaiser-Hill and its team of subcontractors, the site's employees and taxpayers across the country. This paper will: provide a status of the Closure Project to date; describe important accomplishments of the past year; describe some of the closure-enhancing technologies enabling acceleration; and discuss the remaining challenges ahead.

  10. MMCR Upgrades: Present Status and Future Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital

  11. Reynolds Creek Hydroelectric Project, Project Status

    Energy Savers [EERE]

    Hydroelectric Project Project Status November 17, 2009 By : Alvin Edenshaw, President Haida Corporation and Haida Energy, Inc. Mike Stimac, P.E. Vice President, HDR Engineering, Inc. Project Manager November 17, 2009 2 Haida Corporation  Located in Hydaburg on Prince of Wales Island in SE Alaska  Hydaburg population = 350 people (called Kaigani Haida)  Hydaburg is largest Haida Village in Alaska  Subsistence and Commercial Fishing Lifestyle  Substantial Timber Holdings 

  12. July 2012, Training Work Group Status Overview

    Office of Environmental Management (EM)

    Training Work Group Status Overview Accomplishments: 1. May 7 - 8. Attended NIEHS Trainer's Exchange in Oak Ridge . 2. May 8 - 9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker Pilot. 3. June 19-20. Joined Char Wells at Sandia (with NIEHS and HAMMER) for the Learning/Training Workshop. 2. NTC offered support for Data Warehousing at the Learning/Training Workshop. 3. Obtained EFCOG commitment to create a Human Capital Training Subgroup under the Business

  13. Current Status of Concentrator Photovoltaic (CPV) Technology

    SciTech Connect (OSTI)

    Philipps, S. P.; Bett, A. W.; Horowitz, K.; Kurtz, S.

    2015-01-01

    This report describes the current status of the market and technology for concentrator photovoltaic (CPV) cells and modules. Significant progress in CPV has been achieved, including record efficiencies for modules (36.7%) and cells (46%), as well as growth of large field installations in recent years. CPV technology may also have the potential to be cost-competitive on a levelized cost of energy (LCOE) basis in regions of high direct normal irradiance (DNI). The study includes an overview of all installations larger than 1 MW, information on companies currently active in the CPV field, efficiency data, and estimates of the LCOE in different scenarios.

  14. September 2012, Training Work Group Status Overview

    Energy Savers [EERE]

    Training Work Group Status Overview Accomplishments: 1. May 7-8. Attended NIEHS Trainer's Exchange in Oak Ridge. 2. May 8-9. Joined HAMMER in visiting Oak Ridge entities to build support for the Radworker pilot. Entities visited included ORISE, Y-12, DOE TRU Project, and local labor entities. 3. June 19-20. Participated with Char Wells, Sandia National Laboratory Training Manager, (NTC, NIEHS and HAMMER in attendance) at a DOE M&O contractor led Learning/Training Workshop. - Obtained EFCOG

  15. What is the status of the Project

    Broader source: Energy.gov (indexed) [DOE]

    status of the Project? The frst phase of the project was energized on July 20, 2006. It operated fawlessly as an integral part of National Grid's 35-kilovolt network in Albany, serving the equivalent of 25,000 homes. It was taken offine after nine months to begin phase II of the project: replacing a 30-meter section with 2G cable, which will be the world's frst use of 2G in any utility device. Phase II of the project was energized on January 8, 2008. Project Fact Sheet Albany HTS Power Cable

  16. WIPP Performance Assessment: Current Status and the Road Ahead | Department

    Office of Environmental Management (EM)

    of Energy Performance Assessment: Current Status and the Road Ahead WIPP Performance Assessment: Current Status and the Road Ahead Presentation from the 2015 Annual Performance and Risk Assessment (P&RA) Community of Practice (CoP) Technical Exchange Meeting held in Richland, Washington on December 15-16, 2015. PDF icon WIPP Performance Assessment: Current Status and the Road Ahead More Documents & Publications Performance Assessment Updates for Waste Isolation Pilot Plant

  17. West Valley Demonstration Project: A Short History and Status | Department

    Office of Environmental Management (EM)

    of Energy Project: A Short History and Status West Valley Demonstration Project: A Short History and Status Presentation made by Bryan C. Bower for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY. PDF icon West Valley Demonstration Project: A Short History and Status More Documents & Publications EIS-0337-SA-01: Supplement Analysis EIS-0337: Record of Decision Waste-Incidental-to-Reprocessing Evaluation for the West Valley Demonstration Project Vitrification Mel

  18. PEM Stack Manufacturing: Industry Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stack Manufacturing: Industry Status PEM Stack Manufacturing: Industry Status Presented at the NREL Hydrogen and Fuel Cell Manufacturing R&D Workshop in Washington, DC, August 11-12, 2011. PDF icon PEM Stack Manufacturing: Industry Status More Documents & Publications Fuel Cell Manufacturing: American Energy and Manufacturing Competitiveness Summit Low Temperature PEM Fuel Cell Manufacturing Needs A Total Cost of Ownership Model for Low Temperature PEM Fuel Cells in Combined Heat and

  19. Project Status | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Projects, Missions, and Status High Energy Physics (HEP) HEP Home About Research Facilities User Facilities Facility Ops Projects, Missions, and Status Science Highlights Benefits of HEP Funding Opportunities Advisory Committees Community Resources Contact Information High Energy Physics U.S. Department of Energy SC-25/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3624 F: (301) 903-2597 E: Email Us More Information » Facilities Projects, Missions, and Status

  20. The Majorana Double Beta Decay Experiment: Present Status (Conference) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Majorana Double Beta Decay Experiment: Present Status Citation Details In-Document Search Title: The Majorana Double Beta Decay Experiment: Present Status The Majorana collaboration is actively pursuing research and development aimed at a tonne-scale 76Ge neutrinoless double-beta decay experiment, an R&D effort that will field approximately 40 kg of germanium detectors with mixed enrichment levels. This article provides a status update on the construction of the

  1. Outreach and Collaboration Program Status and Accomplishments 2008-2009 |

    Energy Savers [EERE]

    Department of Energy Program Status and Accomplishments 2008-2009 Outreach and Collaboration Program Status and Accomplishments 2008-2009 Outreach and Collaboration has helped HSS expand the DOE's sphere of communication and influence through broad-based dialogues, cultivating productive interagency relationships, and collaborative overtures to external entities - public and private alike - whose interests and goals align with HSS and DOE mission. This status report highlights the

  2. Reorganization Status of the Office of Energy Efficiency and Renewable

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy: Panel Observations | Department of Energy Status of the Office of Energy Efficiency and Renewable Energy: Panel Observations Reorganization Status of the Office of Energy Efficiency and Renewable Energy: Panel Observations This report contains the observations by a panel of the National Academy of Public Administration on the reorganization status of the Department of Energy's Office of Energy Efficiency and Renewable Energy. PDF icon Panel Observations: EERE Reorganization More

  3. Impact of Teaming Arrangements on Small Business Status | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Impact of Teaming Arrangements on Small Business Status Impact of Teaming Arrangements on Small Business Status Impact of Teaming Arrangements on Small Business Status The Department of Energy is planning to set aside for small businesses a number of acquisitions of a very complex nature, requiring a myriad of capabilities on the part of offerors, which might result in teaming arrangements or joint ventures being formed. Given this, the Department believes that potential offerors

  4. Alternative Fuels Data Center: Status Update: Ethanol Blender Pump

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Dispenser Certified (August 2010) Ethanol Blender Pump Dispenser Certified (August 2010) to someone by E-mail Share Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on Facebook Tweet about Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on Twitter Bookmark Alternative Fuels Data Center: Status Update: Ethanol Blender Pump Dispenser Certified (August 2010) on Google Bookmark Alternative

  5. Status of Direct Heat Application Projects | Open Energy Information

    Open Energy Info (EERE)

    Heat Application Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Status of Direct Heat Application Projects Abstract In order to...

  6. PBI-Phosphoric Acid Based Membrane Electrode Assemblies: Status...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Status Update Presentation at the MCFC and PAFC R&D Workshop held Nov. 16, 2009 in Palm Springs, CA PDF icon mcfcpafcworkshopdecastro.pdf More Documents & Publications...

  7. Status of Segmented Element Thermoelectric Generator for Vehicle...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Segmented Element Thermoelectric Generator for Vehicle Waste Heat Recovery Status of Segmented Element Thermoelectric Generator for Vehicle Waste Heat Recovery Discusses progress...

  8. Fusion Nuclear Science and Technology Program - Status and Plans...

    Office of Environmental Management (EM)

    Plans for Tritium Research Fusion Nuclear Science and Technology Program - Status and ... Idaho on September 23-25, 2014. PDF icon Fusion Nuclear Science and Technology Program - ...

  9. Fusion Nuclear Science and Technology Program - Status and plans...

    Office of Environmental Management (EM)

    plans for tritium research Fusion Nuclear Science and Technology Program - Status and ... New Jersey on May 05-07, 2015. PDF icon Fusion Nuclear Science and Technology Program - ...

  10. Montana Pending Water Right Application Status Webpage | Open...

    Open Energy Info (EERE)

    rights application status system. Author Montana Department of Natural Resources and Conservation - Water Resources Division Published State of Montana, Date Not Provided DOI...

  11. Geophysics, Geology and Geothermal Leasing Status of the Lightning...

    Open Energy Info (EERE)

    Leasing Status of the Lightning Dock KGRA, Animas Valley, New Mexico Author C. Smith Published New Mexico Geological Society Guidebook, 1978 DOI Not Provided Check for DOI...

  12. 2010 Inspection and Status Report for the Boiling Nuclear Superheater...

    Office of Legacy Management (LM)

    Annual Inspection - Boiling Nuclear Superheat (BONUS) Site, Rincn, Puerto Rico October 2013 Page 1 2013 Inspection and Status Report for the Former Boiling Nuclear Superheater...

  13. Analysis on Current Status of the Gas Filling Station Networks...

    Open Energy Info (EERE)

    Name: Analysis on Current Status of the Gas Filling Station Networks Website Focus Area: Natural Gas Topics: Potentials & Scenarios Website: www.gashighway.net...

  14. Strategic Analysis of the Global Status of Carbon Capture and...

    Open Energy Info (EERE)

    Summary LAUNCH TOOL Name: Strategic Analysis of the Global Status of Carbon Capture and Storage (CCS): Country Studies, United Arab Emirates Focus Area: Clean Fossil Energy...

  15. Updated Appendices to the Status of Environmental Management...

    Office of Environmental Management (EM)

    the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War Report to Congress Updated Appendices to the Status of Environmental Management...

  16. Status of High Power Tests of Normal Conducting Short Standing...

    Office of Scientific and Technical Information (OSTI)

    Status of High Power Tests of Normal Conducting Short Standing Wave Structures Citation ... Research Org: SLAC National Accelerator Laboratory (SLAC) Sponsoring Org: US DOE Office of ...

  17. Geothermal Heat Pumps: Market Status, Barriers to Adoption, and...

    Open Energy Info (EERE)

    search Tool Summary LAUNCH TOOL Name: Geothermal Heat Pumps: Market Status, Barriers to Adoption, and Actions to Overcome Barriers AgencyCompany Organization: Oak Ridge...

  18. BG/Q Drivers Status | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Blue GeneQ Versus Blue GeneP BGQ Drivers Status Machine Overview Machine Partitions Torus Network Data Storage & File Systems Compiling & Linking Queueing & Running Jobs Data...

  19. DISCLAIMER : UNCONTROLLED WHEN PRINTED - PLEASE CHECK THE STATUS...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    29 Oct 2015 DISCLAIMER : UNCONTROLLED WHEN PRINTED - PLEASE CHECK THE STATUS OF THE DOCUMENT IN IDM Technical Specifications (In-Cash Procurement) Tech Specs for Boundary and first...

  20. Focus Group Meeting (Activities Status) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oversight Concept PDF icon Accomplishments Overview More Documents & Publications Focus Group Meeting (Activities Status) Focus Group Meeting (Topical Wrap-Up) Focus Group...

  1. Focus Group Meeting (Activities Status) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Progress Chart (June 15, 2011) More Documents & Publications Work Group Telecom (Draft Charters) Focus Group Meeting (Activities Status) Focus Group Meeting (Topical Wrap-Up...

  2. Status Report on Paths to Closure | Department of Energy

    Energy Savers [EERE]

    Report on Paths to Closure Status Report on Paths to Closure This status report updates EM's life cycle cost and schedule estimates for completing cleanup, which EM last provided in the 1998 Paths to Closure report. EM issued this status report to update its life-cycle cost and schedule estimates and to introduce additional analyses that offered insights into the long-term scope of the program. PDF icon Status Report on Paths to Closure More Documents & Publications Evolution and History of

  3. Current Status of the high enthalpy conventional geothermal fields...

    Open Energy Info (EERE)

    Current Status of the high enthalpy conventional geothermal fields in Europe and the potential perspectives for their exploitation in terms of EGS Jump to: navigation, search...

  4. ARM AOS Processing Status and Aerosol Intensive Properties VAP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AOS Processing Status and Aerosol Intensive Properties VAP A. S. Koontz and C. J. Flynn Pacific Northwest National Laboratory Richland, Washington J. A. Ogren, E. Andrews, and P....

  5. Annual Hanford Site environmental permitting status report

    SciTech Connect (OSTI)

    Sonnichsen, J.C.

    1998-09-17

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

  6. HARDWARE AND SOFTWARE STATUS OF QCDOC.

    SciTech Connect (OSTI)

    BOYLE,P.A.; CHEN,D.; CHRIST,N.H.; PETROV.K.; ET AL.

    2003-07-15

    QCDOC is a massively parallel supercomputer whose processing nodes are based on an application-specific integrated circuit (ASIC). This ASIC was custom-designed so that crucial lattice QCD kernels achieve an overall sustained performance of 50% on machines with several 10,000 nodes. This strong scalability, together with low power consumption and a price/performance ratio of $1 per sustained MFlops, enable QCDOC to attack the most demanding lattice QCD problems. The first ASICs became available in June of 2003, and the testing performed so far has shown all systems functioning according to specification. We review the hardware and software status of QCDOC and present performance figures obtained in real hardware as well as in simulation.

  7. US nuclear engineering education: Status and prospects

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    This study, conducted under the auspices of the Energy Engineering Board of the National Research Council, examines the status of and outlook for nuclear engineering education in the United States. The study resulted from a widely felt concern about the downward trends in student enrollments in nuclear engineering, in both graduate and undergraduate programs. Concerns have also been expressed about the declining number of US university nuclear engineering departments and programs, the aging of their faculties, the appropriateness of their curricula and research funding for industry and government needs, the availability of scholarships and research funding, and the increasing ratio of foreign to US graduate students. A fundamental issue is whether the supply of nuclear engineering graduates will be adequate for the future. Although such issues are more general, pertaining to all areas of US science and engineering education, they are especially acute for nuclear engineering education. 30 refs., 12 figs., 20 tabs.

  8. Interventional Radiology of Male Varicocele: Current Status

    SciTech Connect (OSTI)

    Iaccarino, Vittorio Venetucci, Pietro

    2012-12-15

    Varicocele is a fairly common condition in male individuals. Although a minor disease, it may cause infertility and testicular pain. Consequently, it has high health and social impact. Here we review the current status of interventional radiology of male varicocele. We describe the radiological anatomy of gonadal veins and the clinical aspects of male varicocele, particularly the physical examination, which includes a new clinical and ultrasound Doppler maneuver. The surgical and radiological treatment options are also described with the focus on retrograde and antegrade sclerotherapy, together with our long experience with these procedures. Last, we compare the outcomes, recurrence and persistence rates, complications, procedure time and cost-effectiveness of each method. It clearly emerges from this analysis that there is a need for randomized multicentre trials designed to compare the various surgical and percutaneous techniques, all of which are aimed at occlusion of the anterior pampiniform plexus.

  9. THE MAJORANA DEMONSTRATOR: OVERVIEW AND STATUS UPDATE

    SciTech Connect (OSTI)

    Keeter, K.; Abgrall, N.; Aguayo, Estanislao; Avignone, F. T.; Barabash, Alexander; Bertrand, F.; Boswell, M.; Brudanin, V.; Busch, Matthew; Caldwell, A. S.; Chan, Yuen-Dat; Christofferson, Cabot-Ann; Combs, Dustin C.; Cuesta, C.; Detwiler, Jason A.; Doe, Peter J.; Efremenko, Yuri; Egorov, Viatcheslav; Ejiri, H.; Elliott, S.; Esterline, James H.; Fast, James E.; Finnerty, P.; Fraenkle, Florian; Galindo-Uribarri, A.; Giovanetti, G. K.; Goett, J.; Green, Matthew P.; Gruszko, J.; Guiseppe, Vincente; Gusev, K.; Hallin, A. L.; Hazama, R.; Hegai, A.; Henning, Reyco; Hoppe, Eric W.; Howard, Stanley; Howe, M. A.; Kidd, M. F.; Kochetov, Oleg; Konovalov, S.; Kouzes, Richard T.; LaFerriere, Brian D.; Leon, Jonathan D.; Leviner, L.; Loach, J. C.; MacMullin, S.; Martin, R. D.; Mertens, S.; Mizouni, Leila; Nomachi, Masaharu; O'Shaughnessy, Mark D.; Orrell, John L.; Overman, Nicole R.; Phillips, D.; Poon, Alan; Pushkin, K.; Radford, D. C.; Rielage, Keith; Robertson, R. G. H.; Ronquest, M. C.; Schubert, Alexis G.; Shanks, B.; Shima, T.; Shirchenko, M.; Snavely, Kyle J.; Snyder, N.; Soin, Aleksandr; Strain, J.; Suriano, Anne-Marie; Swift, Gary; Thompson, J.; Timkin, V.; Tornow, Werner; Varner, R. L.; Vasilyev, Sergey; Vetter, Kai; Vorren, Kris R.; White, Brandon R.; Wilkerson, J. F.; Wiseman, C.; Xu, W.; Yakushev, E.; Young, A.; Yu, Chang-Hong; Yumatov, Vladimir

    2013-04-12

    The MAJORANA DEMONSTRATOR is being constructed at the Sanford Underground Research Facility (SURF) in Lead, SD by the MAJORANA Collaboration to demonstrate the feasibility of a tonne-scale neutrinoless double beta decay experiment based on 76Ge. The observation of neutrinoless double beta decay would indicate that neutrinos can serve as their own antiparticles, thus proving neutrinos to be Majorana particles, and would give information on neutrino masses. Attaining sensitivities for neutrino masses in the inverted hierarchy region requires large tonne-scale detectors with extremely low backgrounds. The DEMONSTRATOR project will show that sufficiently low backgrounds are achievable. A brief description of the detector and a status update on the construction will be given, including the work done at BHSU on acid-etching of Pb shielding bricks.

  10. Annual Hanford Site Environmental Permitting status report

    SciTech Connect (OSTI)

    SONNICHSEN, J.C.

    1999-10-18

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

  11. Status of the Magma Energy Project

    SciTech Connect (OSTI)

    Dunn, J.C.

    1987-01-01

    The current magma energy project is assessing the engineering feasibility of extracting thermal energy directly from crustal magma bodies. The estimated size of the US resource (50,000 to 500,000 quads) suggests a considerable potential impact on future power generation. In a previous seven-year study, we concluded that there are no insurmountable barriers that would invalidate the magma energy concept. Several concepts for drilling, energy extraction, and materials survivability were successfully demonstrated in Kilauea Iki lava lake, Hawaii. The present program is addressing the engineering design problems associated with accessing magma bodies and extracting thermal energy for power generation. The normal stages for development of a geothermal resource are being investigated: exploration, drilling and completions, production, and surface power plant design. Current status of the engineering program and future plans are described. 20 refs., 12 figs.

  12. Technology Deployment Case Studies

    Broader source: Energy.gov [DOE]

    Find technology deployment case studies below. Click on each individual project link to see the full case study. You can also view a map of technology deployment case studies.

  13. Microsoft PowerPoint - SubStatusJune2010.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Slide 4 Sub-agreement Status 2 In Development - 2007 155 Total 3 In Development - 2010 2 In Development - 2009 5 In Development - 2008 143 Total 15 10 - 50% Complete 16 50 - 80% Complete 3 90% Complete 109 Complete Number of Sub-agreements Status

  14. OTEC: status and potential of private funding

    SciTech Connect (OSTI)

    Francis, E.J.; Richards, D.

    1982-01-01

    A financial analysis approach is described for calculating net present values and financial management rates of return for a wide variety of specific OTEC cases. Comparisons are made of the profit potentials, expected market penetration, perceived financial risks, and eventual benefits from the specific cases and logical follow-on construction scenarios. The principal factors of uncertainty as perceived by researchers, builders, and financiers are catalogued. Roles and responsibilities of participants in a financing approach including builder team, government, product user, financial houses, and investors are cited. Cases which have been investigated include 10 to 40 MW/sub e/ scale and 250 to 360 MW/sub e/ scale OTEC plants and plantships; electric power cabled ashore to US islands and the US mainland, methanol, ammonia, hybrid geothermal-OTEC plants for meeting local power demands or making products; and relevant data on other OTEC product possibilities.

  15. Rate Case Elements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proceeding Rate Information Residential Exchange Program Surplus Power Sales Reports Rate Case Elements BPA's rate cases are decided "on the record." That is, in making a decision...

  16. BP-12 Rate Case

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Skip navigation links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases BP-18 Rate Case Related Publications Meetings...

  17. BP-16 Rate Case

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Skip navigation links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases BP-18 Rate Case Related Publications Meetings...

  18. Before a Rate Case

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases BP-18 Rate Case Related Publications Meetings and Workshops Customer...

  19. OSCARS Case Studies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OSCARS & JGI Science DMZ Case Studies Multi-facility Workflow Case Study News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet...

  20. WARP Case Study

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WARP Case Study WARP Case Study Background WARP is an accelerator code that is used to conduct detailed simulations of particle accelerators, among other high energy physics...

  1. 10 CFR 851 Work Group Status Overview - July 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2012 10 CFR 851 Work Group Status Overview - July 2012 Documents Available for Download PDF icon July 2012 Status Overviews More Documents & Publications 10 CFR 851 Work Group Status Overview - September 2012 Workforce Retention Work Group Status Overview - July 2012 Strategic Initiatives Work Group Status Overview - July 2012

  2. Natural gas vehicles : Status, barriers, and opportunities.

    SciTech Connect (OSTI)

    Rood Werpy, M.; Santini, D.; Burnham, A.; Mintz, M.; Energy Systems

    2010-11-29

    In the United States, recent shale gas discoveries have generated renewed interest in using natural gas as a vehicular fuel, primarily in fleet applications, while outside the United States, natural gas vehicle use has expanded significantly in the past decade. In this report for the U.S. Department of Energy's Clean Cities Program - a public-private partnership that advances the energy, economic, and environmental security of the U.S. by supporting local decisions that reduce petroleum use in the transportation sector - we have examined the state of natural gas vehicle technology, current market status, energy and environmental benefits, implications regarding advancements in European natural gas vehicle technologies, research and development efforts, and current market barriers and opportunities for greater market penetration. The authors contend that commercial intracity trucks are a prime area for advancement of this fuel. Therefore, we examined an aggressive future market penetration of natural gas heavy-duty vehicles that could be seen as a long-term goal. Under this scenario using Energy Information Administration projections and GREET life-cycle modeling of U.S. on-road heavy-duty use, natural gas vehicles would reduce petroleum consumption by approximately 1.2 million barrels of oil per day, while another 400,000 barrels of oil per day reduction could be achieved with significant use of natural gas off-road vehicles. This scenario would reduce daily oil consumption in the United States by about 8%.

  3. Salt repository project closeout status report

    SciTech Connect (OSTI)

    1988-06-01

    This report provides an overview of the scope and status of the US Department of Energy (DOE`s) Salt Repository Project (SRP) at the time when the project was terminated by the Nuclear Waste Policy Amendments Act of 1987. The report reviews the 10-year program of siting a geologic repository for high-level nuclear waste in rock salt formations. Its purpose is to aid persons interested in the information developed during the course of this effort. Each area is briefly described and the major items of information are noted. This report, the three salt Environmental Assessments, and the Site Characterization Plan are the suggested starting points for any search of the literature and information developed by the program participants. Prior to termination, DOE was preparing to characterize three candidate sites for the first mined geologic repository for the permanent disposal of high-level nuclear waste. The sites were in Nevada, a site in volcanic tuff; Texas, a site in bedded salt (halite); and Washington, a site in basalt. These sites, identified by the screening process described in Chapter 3, were selected from the nine potentially acceptable sites shown on Figure I-1. These sites were identified in accordance with provisions of the Nuclear Waste Policy Act of 1982. 196 refs., 21 figs., 11 tabs.

  4. EVMS Training Snippet: 2.4 Contract Funds Status Report (CFSR...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Contract Funds Status Report (CFSR) Overview and Reconciliation with IPMRCPR EVMS Training Snippet: 2.4 Contract Funds Status Report (CFSR) Overview and Reconciliation with...

  5. Heavy-Duty Powertrain DevelopmentCurrent Status and Future Opportuniti...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DevelopmentCurrent Status and Future Opportunities Heavy-Duty Powertrain DevelopmentCurrent Status and Future Opportunities Presentation given at the 16th Directions in ...

  6. Status of U.S. Nuclear Outages - U.S. Energy Information Administration

    Gasoline and Diesel Fuel Update (EIA)

    (EIA) < NUCLEAR & URANIUM Data Status of U.S. Nuclear Outages Download Download Link to: Nuclear Regulatory Commission's Power Reactor Status Report

  7. Alternatives to incineration. Technical area status report

    SciTech Connect (OSTI)

    Schwinkendorf, W.E.; McFee, J.; Devarakonda, M.; Nenninger, L.L.; Fadullon, F.S.; Donaldson, T.L.; Dickerson, K.

    1995-04-01

    Recently, the DOE`s Mixed Waste Integrated Program (MWIP) (superseded by the Mixed Waste Focus Area) initiated an evaluation of alternatives to incineration to identify technologies capable of treating DOE organically contaminated mixed wastes and which may be more easily permitted. These technologies have the potential of alleviating stakeholder concerns by decreasing off-gas volurties and the associated emissions of particulates, volatilized metals and radionuclides, PICs, NO{sub x}, SO{sub x}, and recombination products (dioxins and furans). Ideally, the alternate technology would be easily permitted, relatively omnivorous and effective in treating a variety of wastes with varying constituents, require minimal pretreatment or characterization, and be easy to implement. In addition, it would produce secondary waste stream volumes significantly smaller than the original waste stream, and would minimize the environmental health and safety effects on workers and the public. The purpose of this report is to provide an up-to-date (as of early 1995) compendium of iternative technologies for designers of mixed waste treatment facilities, and to identify Iternate technologies that may merit funding for further development. Various categories of non-thermal and thermal technologies have been evaluated and are summarized in Table ES-1. Brief descriptions of these technologies are provided in Section 1.7 of the Introduction. This report provides a detailed description of approximately 30 alternative technologies in these categories. Included in the report are descriptions of each technology; applicable input waste streams and the characteristics of the secondary, or output, waste streams; the current status of each technology relative to its availability for implementation; performance data; and costs. This information was gleaned from the open literature, governments reports, and discussions with principal investigators and developers.

  8. Mechanisms Engineering Test Loop - Phase I Status Report - FY2015

    SciTech Connect (OSTI)

    Hvasta, M.; Grandy, C.; Lisowski, D.; Borowski, A.

    2015-09-01

    This report documents the current status of the Mechanisms Engineering Test Loop (METL) as of the end of FY2015. METL is currently in Phase I of its design and construction.

  9. Global Liquefied Natural Gas Market: Status and Outlook, The

    Reports and Publications (EIA)

    2003-01-01

    The Global Liquefied Natural Gas Market: Status & Outlook was undertaken to characterize the global liquefied natural gas (LNG) market and to examine recent trends and future prospects in the LNG market.

  10. ARM Value-Added Cloud Products: Description and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Value-Added Cloud Products: Description and Status M. A. Miller, K. L. Johnson, and D. T. Troyan Brookhaven National Laboratory Upton, New York E. E. Clothiaux Pennsylvania State...

  11. US Geothermal Updates Status of Development Projects New Wells...

    Open Energy Info (EERE)

    Hot Springs Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: US Geothermal Updates Status of Development Projects New Wells Drilled at Neal Hot Springs...

  12. Wind Energy Status and Future Wind Engineering Challenges: Preprint

    SciTech Connect (OSTI)

    Thresher, R.; Schreck, S.; Robinson, M.; Veers, P.

    2008-08-01

    This paper describes the current status of wind energy technology, the potential for future wind energy development and the science and engineering challenges that must be overcome for the technology to meet its potential.

  13. Radiological Final Status Survey of the Hammond Depot, Hammond, Indiana

    SciTech Connect (OSTI)

    T.J. Vitkus

    2008-04-07

    ORISE conducted extensive scoping, characterization, and final status surveys of land areas and structures at the DNSC’s Hammond Depot located in Hammond, Indiana in multiple phases during 2005, 2006 and 2007.

  14. Proton Therapy for Cancer: Current Status, Promise and Challenges...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 9, 2016, 4:15pm to 5:30pm Colloquia MBG Auditorium Proton Therapy for Cancer: Current Status, Promise and Challenges Dr. Dennis Mah ProCure Proton Therapy Center Colloquium...

  15. AEO2014 results and status updates for the AEO2015

    U.S. Energy Information Administration (EIA) Indexed Site

    For AEO Electricity Working Group July 31, 2014, 1:00 PM ... status updates for the AEO2015 Working group presentation ... * The U.S. Energy Information Administration is ...

  16. Advanced Collaborative Emissions Study (ACES): Phase 2 Status Report

    Broader source: Energy.gov [DOE]

    Discusses status of ACES, a cooperative multi-party effort to characterize emissions and possible health effects of new advanced heavy duty engine and control systems and fuels in the market 2007 - 2010

  17. Compact Ignition Tokamak Program: status of FEDC studies

    SciTech Connect (OSTI)

    Flanagan, C.A.

    1985-01-01

    Viewgraphs on the Compact Ignition Tokamak Program comprise the report. The technical areas discussed are the mechanical configuration status, magnet analysis, stress analysis, cooling between burns, TF coil joint, and facility/device layout options. (WRF)

  18. wh_mission_status.pdf | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    wh_mission_status.pdf More Documents & Publications White House Mission Requests Memorandum FOIA-Summary of Findings: Circumstances surrounding decisions regarding the security clearance, access and work assignments Science at its Best, Security at its Worst

  19. Updated Appendices to the Status of Environmental Management Initiatives to

    Office of Environmental Management (EM)

    Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War Report to Congress | Department of Energy Updated Appendices to the Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War Report to Congress Updated Appendices to the Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of

  20. Hydrogen Production and Storage for Fuel Cells: Current Status | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy and Storage for Fuel Cells: Current Status Hydrogen Production and Storage for Fuel Cells: Current Status Presented at the Clean Energy States Alliance and U.S. Department of Energy Webinar: Hydrogen Production and Storage for Fuel Cells, February 2, 2011. PDF icon infocallfeb11_lipman.pdf More Documents & Publications Fuel Cells for Supermarkets: Cleaner Energy with Fuel Cell Combined Heat and Power Systems Financing Fuel Cells The Department of Energy Hydrogen and Fuel Cells

  1. Fusion Nuclear Science and Technology Program - Status and Plans for

    Office of Environmental Management (EM)

    Tritium Research | Department of Energy Plans for Tritium Research Fusion Nuclear Science and Technology Program - Status and Plans for Tritium Research Presentation from the 34th Tritium Focus Group Meeting held in Idaho Falls, Idaho on September 23-25, 2014. PDF icon Fusion Nuclear Science and Technology Program - Status and Plans for Tritium Research More Documents & Publications Tritium Operation Improvements at the Idaho National Laboratory (INL) Safety and Tritium Applied Research

  2. Application for Research Affiliate Associate & Student Status |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photosynthetic Antenna Research Center Research Affiliate Program / Application for Research Affiliate Associate & Student Status Application for Research Affiliate Associate & Student Status The following application is for associates and students of PARC Research Affiliates to gain official membership in PARC. Membership is open to students and associates working on PARC-related research under a PARC Research Affiliate. Interested applicants should: Complete the brief application

  3. 3-D Combustion Simulation Strategy Status, Future Potential, and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application Issues | Department of Energy Combustion Simulation Strategy Status, Future Potential, and Application Issues 3-D Combustion Simulation Strategy Status, Future Potential, and Application Issues 2004 Diesel Engine Emissions Reduction (DEER) Conference Presentation: DaimlerChrylser PDF icon 2004_deer_steiner.pdf More Documents & Publications Advancement in Fuel Spray and Combustion Modeling for Compression Ignition Engine Applications Advancement in Fuel Spray and Combustion

  4. PBI-Phosphoric Acid Based Membrane Electrode Assemblies: Status Update |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy PBI-Phosphoric Acid Based Membrane Electrode Assemblies: Status Update PBI-Phosphoric Acid Based Membrane Electrode Assemblies: Status Update Presentation at the MCFC and PAFC R&D Workshop held Nov. 16, 2009 in Palm Springs, CA PDF icon mcfc_pafc_workshop_de_castro.pdf More Documents & Publications MCFC and PAFC R&D Workshop Summary Report Manufacturing Barriers to High Temperature PEM Commercialization Membrane Development for Medium and High Temperature

  5. June 2013, FTCP Senior Technical Safety Manager (STSM) Status Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEDERAL TECHNICAL CAPABILITY PANEL SENIOR TECHNICAL SAFETY MANAGER STATUS REPORT U.S. Department of Energy Washington, D.C. 20585 June 2013 FEDERAL TECHNICAL CAPABILITY PANEL List of Senior Technical Safety Manager (STSM) Positions ORGANIZATION: Office of Environmental Management - Carlsbad Field Office 2 Position Title Incumbent Base Requirements Compensatory Measures Qualification Status Comments Technical Degree Experience Manager Carlsbad Field Office Jose R. Franco Yes Yes No Complete

  6. Waste Isolation Pilot Plant Status and Plans - 2010

    Office of Environmental Management (EM)

    Status and Plans WIPP Status and Plans - - 2010 2010 National Transportation Stakeholders Forum National Transportation Stakeholders Forum Chicago, Illinois Chicago, Illinois May 26, 2010 May 26, 2010 Dr. Dave Moody Dr. Dave Moody Manager Manager Carlsbad Field Office Carlsbad Field Office May 26, 2010 May 26, 2010 Transportation Success * First shipment to WIPP departed Los Alamos National Laboratory on March 25, 1999 * WIPP honored with U.S. Transport Council award for transportation safety in

  7. Aftertreatment Modeling Status, Futur Potential, and Application Issues |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Modeling Status, Futur Potential, and Application Issues Aftertreatment Modeling Status, Futur Potential, and Application Issues 2004 Diesel Engine Emissions Reduction (DEER) Conference Presentation: DaimlerChrysler NAFTA Truck Business Unit PDF icon 2004_deer_zhang.pdf More Documents & Publications SCR Potential and Issues for Heavy-Duty Applications in the United States Future Diesel Engine Thermal Efficiency Improvement andn Emissions Control Technology

  8. Status and EAC Recommendations for Electricity Delivery Workforce

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (September 2014) | Department of Energy Status and EAC Recommendations for Electricity Delivery Workforce (September 2014) Status and EAC Recommendations for Electricity Delivery Workforce (September 2014) This memo, approved at the September 2014 EAC meeting and delivered to the Department of Energy, reports on the activities since September 2013 of the Workforce Work Group and makes recommendations to the DOE. The recommendations include the development of a DOE response to an October 2012

  9. Vacancy Announcement Status Report, Updated 01/09/03

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vacancy Announcement Status Report, Updated for 03/23/2015 Vacancy Position PP/Series/Grade Organization Status Specialist DOE-NETL-15 DE-010 General Engineer GS-0801-13 SEA & PD Opens: 12/15/14 Closed: 12/29/14 Certificate of Eligibles Issued: 12/31/14 Selection Made; Eff. Date: 4/05/15 Donna Isaac LEGEND: Open: Closes: Reviewing Applications Certificate of Eligibles Issued: Certificate of Eligibles Extended to: Selection Made: Vacancy Canceled No Selection Made

  10. Los Alamos National Laboratory receives Star Status recognition for safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    excellence from Department of Energy LANL receives recognition for safety excellence Los Alamos National Laboratory receives Star Status recognition for safety excellence from Department of Energy Los Alamos becomes the largest site in the DOE complex to receive VPP Star Status. October 8, 2014 Officials from the Department of Energy and the National Nuclear Security Administration joined Laboratory managers and employees at a VPP Star flag raising ceremony. Officials from the Department of

  11. NAFTA Heavy Duty Engine and Aftertreatment Technology: Status and Outlook |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy NAFTA Heavy Duty Engine and Aftertreatment Technology: Status and Outlook NAFTA Heavy Duty Engine and Aftertreatment Technology: Status and Outlook Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the U.S. DOE's EERE FreedomCar and Fuel Partnership and 21st Century Truck Programs. PDF icon 2006_deer_lysinger.pdf More Documents & Publications Heavy-Duty Engine Technology for High Thermal Efficiency at EPA 2010 Emissions Regulations

  12. NREL: Hydrogen and Fuel Cells Research - Fuel Cell Technology Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Analysis Fuel Cell Technology Status Analysis Get Involved Fuel cell developers interested in collaborating with NREL on fuel cell technology status analysis should send an email to NREL's Technology Validation Team at techval@nrel.gov. NREL's analysis of fuel cell technology provides objective and credible information about new fuel cell technologies with a focus on performance, durability, and price. As demand for fuel cells grows, U.S. manufacturers are developing these technologies for a

  13. ARM - ARM Instrumentation Status: New, Current, and Future

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Instrumentation Status: New, Current, and Future Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library Videos Publication Resources Submit a Publication Publishing Procedures ARM Style Guide (PDF, 448KB) Acronyms Glossary Logos Contacts RSS for Publications ARM Instrumentation Status: New, Current, and Future October-December 2010 (PDF, 1.7MB) September 2010 (PDF, 1.0MB) August 2010 (PDF, 1.0MB)

  14. EV Everywhere Grand Challenge - Battery Status and Cost Reduction Prospects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Status and Cost Reduction Prospects EV Everywhere Grand Challenge - Battery Status and Cost Reduction Prospects Presentation given by technology manager David Howell at the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL. PDF icon 5_howell_b.pdf More Documents & Publications PHEV Battery Cost Assessment Overview of Battery R&D Activities Overview of Battery R&D Activities

  15. Electric Drive Status and Challenges | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Status and Challenges Electric Drive Status and Challenges Presentation given at the EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop on July 24, 2012 held at the Doubletree O'Hare, Chicago, IL. PDF icon 4_rogers_ed.pdf More Documents & Publications Power Electronics and Thermal Management Breakout Session Advanced Power Electronics and Electric Motors (APEEM) R&D Program Overview Advanced Power Electronics and Electric Motors (APEEM)

  16. Status Update of the Majorana Demonstrator Neutrinoless Double Beta Decay

    Office of Scientific and Technical Information (OSTI)

    Experiment (Technical Report) | SciTech Connect Status Update of the Majorana Demonstrator Neutrinoless Double Beta Decay Experiment Citation Details In-Document Search Title: Status Update of the Majorana Demonstrator Neutrinoless Double Beta Decay Experiment Neutrinoless double beta decay searches play a major role in determining neutrino properties, in particular the Majorana or Dirac nature of the neutrino and the absolute scale of the neutrino mass. The consequences of these searches go

  17. Status Update of the Majorana Demonstrator Neutrinoless Double Beta Decay

    Office of Scientific and Technical Information (OSTI)

    Experiment (Technical Report) | SciTech Connect Technical Report: Status Update of the Majorana Demonstrator Neutrinoless Double Beta Decay Experiment Citation Details In-Document Search Title: Status Update of the Majorana Demonstrator Neutrinoless Double Beta Decay Experiment × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit

  18. Status of Pu-239 Evaluations (Conference) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Status of Pu-239 Evaluations Citation Details In-Document Search Title: Status of Pu-239 Evaluations Authors: Kawano, Toshihiko [1] ; Talou, Patrick [1] ; Chadwick, Mark B. [1] + Show Author Affiliations Los Alamos National Laboratory [Los Alamos National Laboratory Publication Date: 2013-12-06 OSTI Identifier: 1110310 Report Number(s): LA-UR-13-29265 DOE Contract Number: AC52-06NA25396 Resource Type: Conference Resource Relation: Conference: NEMEA-7/CIELO, International Collaboration on Nuclear

  19. Microsoft Word - 2006 Status Report_final.doc

    Office of Legacy Management (LM)

    Annual Status Report - Salt Lake City, Utah November 2006 Page 1 2006 Annual Status Report for the Salt Lake City, Utah, UMTRCA Title I Processing Site Summary The second year of reduced ground water monitoring at the Salt Lake City Processing Site was conducted on July 25, 2006. Reduced ground water monitoring was performed as recommended by the State of Utah Department of Environmental Quality, Division of Radiation Control (Utah DEQ/DRC) and directed by the U.S. Nuclear Regulatory Commission

  20. Fiscal Year 2014 ASCEM Status Report | Department of Energy

    Energy Savers [EERE]

    4 ASCEM Status Report Fiscal Year 2014 ASCEM Status Report Through the collaborative efforts of diverse staff from the national laboratories, the Advanced Simulation Capability for Environmental Management Initiative (ASCEM ) team made excellent progress during fiscal year 2014, including enhancements of capabilities, early deployments and use within the EM complex, and release of a research version of ASCEM to end users and sessions at EM sites for feedback and evaluation. PDF icon Fiscal Year

  1. Status of Segmented Element Thermoelectric Generator for Vehicle Waste Heat

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery | Department of Energy Segmented Element Thermoelectric Generator for Vehicle Waste Heat Recovery Status of Segmented Element Thermoelectric Generator for Vehicle Waste Heat Recovery Discusses progress of thermoelectric generator development at BSST and assessment of potential to enter commercial operation in vehicles PDF icon crane.pdf More Documents & Publications Status of Segmented Element Thermoelectric Generator for Vehicle Waste Heat Recovery Development of a 100-Watt

  2. Status of UFD Campaign International Activities in Disposal Research |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Status of UFD Campaign International Activities in Disposal Research Status of UFD Campaign International Activities in Disposal Research Several international organizations have made significant progress in the characterization and performance evaluation of other disposal design options and host rock characteristics (clay/shale, granite), most of which were very different from those studied in the United States. The DOE recognizes that close international collaboration

  3. Webinar: National Hydrogen Learning Demonstration Status | Department of

    Broader source: Energy.gov (indexed) [DOE]

    Energy Hydrogen Learning Demonstration Status," originally presented on February 6, 2012. In addition to this text version of the audio, you can access the presentation slides. Moderator: Well, welcome to the Fuel Cell Technologies Office webinar. Today you will be hearing about the National Hydrogen Learning Demonstration status. And our speaker today is Keith Wipke, from the National Renewable Energy Laboratory. And introducing Keith will be our technology development manager, Jason

  4. Alternative Fuels Data Center: Status Update: Clarification of Ethanol

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Certification Limits for Legacy Equipment (December 2008) Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) to someone by E-mail Share Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Facebook Tweet about Alternative Fuels Data Center: Status Update: Clarification of Ethanol Certification Limits for Legacy Equipment (December 2008) on Twitter Bookmark Alternative Fuels Data

  5. Case studies of six high priority DOD installations

    SciTech Connect (OSTI)

    1994-11-01

    This is a supplement to the report entitled Environmental Cleanup: Too Many High Priority Sites Impede DOD`s Program. It provides six installation case studies addressing issues including the status of the restoration program, the cost of cleanup to date and projected costs, the cleanup options considered, the option selected, expected completion, and the applicable cleanup standards. The case studies also provide installation specific information on reasons installation was listed on the NPL, the regulatory process, cooperation between the installation and the regulatory agencies, staffing at the installations and the regulatory agencies, and the process for funding the cleanup.

  6. The Super-B Project Accelerator Status

    SciTech Connect (OSTI)

    Biagini, M.E.; Alesini, D.; Boni, R.; Boscolo, M.; Demma, T.; Drago, A.; Esposito, M.; Guiducci, S.; Marcellini, F.; Mazzitelli, G.; Preger, M.; Raimondi, P.; Sanelli, C.; Serio, M.; Stecchi, A.; Stella, A.; Tomassini, S.; Zobov, M.; Bertsche, K.; Brachmann, A.; Cai, Y.; /SLAC /Novosibirsk, IYF /Annecy, LAPP /LPSC, Grenoble /Orsay, LAL /Saclay /Pisa U. /CERN

    2011-08-17

    The SuperB project is an international effort aiming at building in Italy a very high luminosity e{sup +}e{sup -} (10{sup 36} cm{sup -2} sec{sup -1}) asymmetric collider at the Y(4S) energy in the CM. The accelerator design has been extensively studied and changed during the past year. The present design, based on the new collision scheme, with large Piwinski angle and the use of 'crab waist' sextupoles already successfully tested at the DA{Phi}NE {Phi}-Factory at LNF Frascati, provides larger flexibility, better dynamic aperture and spin manipulation sections in the Low Energy Ring (LER) for longitudinal polarization of the electron beam at the Interaction Point (IP). The Interaction Region (IR) has been further optimized in terms of apertures and reduced backgrounds in the detector. The injector complex design has been also updated. A summary of the project status will be presented in this paper. The SuperB collider can reach a peak luminosity of 10{sup 36} cm{sup -2} sec{sup -1} with beam currents and bunch lengths similar to those of the past and present e{sup +}e{sup -} Factories, through the use of smaller emittances and new scheme of crossing angle collision. The beams are stored in two rings at 6.7 GeV (HER) and 4.2 GeV (LER). Unique features of the project are the polarization of the electron beam in the LER and the possibility to decrease the energies for running at the {tau}/charm threshold. The option to reuse the PEP-II B-Factory (SLAC) hardware will allow reducing costs. The SuperB facility will require a big complex of civil infrastructure. The main construction, which will house the final part of the LINAC, the injection lines, the damping rings, and the storage rings, will be mainly underground. Two sites have been considered: the campus of Tor Vergata University near Frascati, and the INFN Frascati Laboratory. No decision has been made yet. A footprint of the possible SuperB layout on the LNF area is shown in Fig. 1.

  7. Science DMZ Case Studies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science DMZ Case Studies Science DMZ @ UF Science DMZ @ CU Science DMZ @ Penn & VTTI Science DMZ @ NOAA Science DMZ @ NERSC Science DMZ @ ALS Multi-facility Workflow Case Study...

  8. Parking Lot Solar PV with EV Charger Grant Program

    Broader source: Energy.gov [DOE]

    NOTE: The program has been renewed for FY2016. Applications for funding are due by January 12, 2016. 

  9. Promising Technology: Parking Lot Light-Emitting Diodes with Controls

    Broader source: Energy.gov [DOE]

    LEDs offer several advantages over conventional high intensity discharge (HID) luminaires. LEDs have longer life times, reduced maintenance and operating costs, superior color rendition, and lower energy consumption.

  10. Y-12 apprentice programs are a lot like TAT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at Y-12 from 1966 to 1984 served as a model for other training programs. Y-12's long history of apprenticeship programs began at much the same time as the TAT program. It was...

  11. U.S. Fuel Cell Electric Vehicle Demonstration Project 2010 Status Update (Presentation)

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

    2010-10-21

    This presentation summarizes U.S. Fuel Cell Electric Vehicle Demonstration Project 2010 Status Update.

  12. 10 CFR 851 Work Group Status Overview - September 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy September 2012 10 CFR 851 Work Group Status Overview - September 2012 Documents Available for Download PDF icon September 2012 Status Overviews More Documents & Publications 10 CFR 851 Work Group Status Overview - July 2012 Focus Group Meeting (Activities Status) Focus Group Meeting (Topical Meeting)

  13. Waste Isolation Pilot Plant Update and Status of Recovery | Department of

    Office of Environmental Management (EM)

    Energy Isolation Pilot Plant Update and Status of Recovery Waste Isolation Pilot Plant Update and Status of Recovery Topic: Dana Bryson CBFO, Provided Information on the Status of the WIPP Site Recovery. Information Provided Included the two WIPP Events that Resulted in the Site Operations Shut Down and The Status of the Investigations. PDF icon WIPPP Update - May 21, 2014 More Documents & Publications WIPP Update and Status of Recovery NNMCAB Board Minutes: May 2014 Pojoaque Waste

  14. Status report on SHARP coupling framework.

    SciTech Connect (OSTI)

    Caceres, A.; Tautges, T. J.; Lottes, J.; Fischer, P.; Rabiti, C.; Smith, M. A.; Siegel, A.; Yang, W. S.; Palmiotti, G.

    2008-05-30

    This report presents the software engineering effort under way at ANL towards a comprehensive integrated computational framework (SHARP) for high fidelity simulations of sodium cooled fast reactors. The primary objective of this framework is to provide accurate and flexible analysis tools to nuclear reactor designers by simulating multiphysics phenomena happening in complex reactor geometries. Ideally, the coupling among different physics modules (such as neutronics, thermal-hydraulics, and structural mechanics) needs to be tight to preserve the accuracy achieved in each module. However, fast reactor cores in steady state mode represent a special case where weak coupling between neutronics and thermal-hydraulics is usually adequate. Our framework design allows for both options. Another requirement for SHARP framework has been to implement various coupling algorithms that are parallel and scalable to large scale since nuclear reactor core simulations are among the most memory and computationally intensive, requiring the use of leadership-class petascale platforms. This report details our progress toward achieving these goals. Specifically, we demonstrate coupling independently developed parallel codes in a manner that does not compromise performance or portability, while minimizing the impact on individual developers. This year, our focus has been on developing a lightweight and loosely coupled framework targeted at UNIC (our neutronics code) and Nek (our thermal hydraulics code). However, the framework design is not limited to just using these two codes.

  15. NGNP Project 2011 Status and Path Forward

    SciTech Connect (OSTI)

    L.E. Demick

    2011-12-01

    High Temperature Gas Reactor (HTGR) technology can play an important role in the United States’ energy future by extending the use of nuclear energy for non-electricity energy production missions as well as continuing to provide a considerable base load electric power generation capability. Extending nuclear energy into the industrial and transportation sectors through the co-production of process heat and electricity provides safe and reliable energy for these sectors in an environmentally responsible manner. The safety case for the modular HTGR provides a substantial improvement in nuclear plant safety for the protection of the public and the environment, and supports collocation of the HTGR with major industrial facilities. The NGNP Project at the Idaho National Laboratory has been working toward an objective of commercializing the HTGR technology under DOE direction since 2006. The Project is undergoing a quantum shift in direction and scope as a result of recent DOE decisions. This paper summarizes where the Project has been, where it is at the time of this writing and what is needed in future activities to commercialize HTGR technology.

  16. EMGeo Case Study

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EMGeo Case Study EMGeo Case Study Background EMGeo is composed of two geophysical imaging applications: one for subsurface imaging using electromagnetic data and another using seismic data. Although the applications model different physics (Maxwell's equations in one case, the elastic wave equation in another) they have much in common. First, both are structured similarly, taking advantage of high-level data parallelism to solve many semi-independent sub-problems concurrently, yielding excellent

  17. Application Case Studies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Studies Application Case Studies Early work with NESAP Staff at NERSC as well as Cray and Intel Engineers have lead to a number of application case studies. Early application case studies The Babbage test system was used to study representative applications and kernels in various scientific fields to gain experience with the challenges and strategies needed to optimize code performance on the MIC architecture. Below we highlight a few examples: BerkeleyGW The BerkeleyGW package is a materials

  18. Case Study FAQ

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Reviews: Target 2017 Requirements Reviews: Target 2014 Overview Published Reports Case Study FAQs NERSC HPC Achievement Awards Share Your Research User Submitted Research Citations NERSC Citations Home » Science at NERSC » HPC Requirements Reviews » Case Study FAQs Case Study FAQ General Questions What is NERSC? NERSC is the National Energy Research Scientific Computing Center, the high-end scientific computing facility for the Department of Energy's Office of Science. NERSC

  19. OSCARS Case Study

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Network OSCARS How It Works Who's Using OSCARS? OSCARS and Future Tech OSCARS Standard and Open Grid Forum OSCARS Developers Community Read More... OSCARS Case Study...

  20. Appendix A: Reference case

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Reference case Energy Information Administration Annual Energy Outlook 2014 Table A17. Renewable energy consumption by sector and source (quadrillion Btu) Sector and source...

  1. Appendix A: Reference case

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    4 Reference case Table A2. Energy consumption by sector and source (quadrillion Btu per year, unless otherwise noted) Energy Information Administration Annual Energy Outlook 2014...

  2. Health status of young children with cancer following discontinuation of therapy

    SciTech Connect (OSTI)

    Pastore, G.; Zurlo, M.G.; Acquaviva, A.; Calculli, G.; Castello, M.; Ceci, A.; Di Tullio, M.L.; Gandus, S.; Macchia, P.; Di Montezemolo, L.C.

    1987-01-01

    This paper reports late effects and health status of 198 children who had cancer or leukemia diagnosed under 2 years of age and their therapies electively withdrawn. This series (92 neuroblastoma (NBL), 57 Wilms' tumor (WT), 46 acute lymphoblastic leukemia (ALL), and 3 non-Hodgkin's lymphoma) was followed for 1-12 years after discontinuation of therapy. Thirty-three children were diagnosed before 1973, 92 between 1973 and 1977, and 73 after 1977 in 16 Italian Pediatric Oncology Centers. As of December 1983, 176 children were reported to be alive and without evidence of primary cancer by physicians responsible for their care. One child died from a second primary tumor, two from late recurrences of the primary cancer, and three from other causes; eight were alive with evidence of primary cancer; and eight were lost to follow-up. Kyphoscoliosis was found in 22 children and other musculoskeletal anomalies in 8. Neurological sequelae were observed in 8 of 35 children with ALL treated with radiotherapy (RT) and intrathecal methotrexate. All but one were in continuous complete remission when they developed seizures (three cases), leukoencephalopathy (three cases), or intracerebral calcifications (two cases). One child had cardiomyopathy and subsequently died from cardiac failure: he had received doxorubicin (400 mg/m2) and mediastinal RT (13 Gy) for NBL. Growth impairments were observed in children with NBL and WT.

  3. Corrective Action Unit Deliverable/Task Status Tracking Tool

    Energy Science and Technology Software Center (OSTI)

    2009-08-13

    The CDSTool is a project management tool designed specifically to manage environmental restoration projects. The tool allows users to capture all projects in their baseline, develop and assign approaches, assign documents and reviews to particular projects and approaches, track and measure progress and status of each document/phase/activity in the project, based on the approach. The CDSTtool provides the ability to assign responsible personnel to each activity, provide status to scheduling software, track WBS, capture issues,more »comments, and history of development or performance related to the activity, document or phase.« less

  4. Light-duty diesel engine development status and engine needs

    SciTech Connect (OSTI)

    Not Available

    1980-08-01

    This report reviews, assesses, and summarizes the research and development status of diesel engine technology applicable to light-duty vehicles. In addition, it identifies specific basic and applied research and development needs in light-duty diesel technology and related health areas where initial or increased participation by the US Government would be desirable. The material presented in this report updates information provided in the first diesel engine status report prepared by the Aerospace Corporation for the Department of Energy in September, 1978.

  5. An Alfirmotive Action/Equal Opportunity Employer STATUS AND PLANS

    Office of Legacy Management (LM)

    I&s ' c c scilenti ? alamos c laboratoiy of ihe University of California Lsr i'"""', i'" MEXICO 8,545 An Alfirmotive Action/Equal Opportunity Employer STATUS AND PLANS REPORT FOR FORMER TECHNICAL AREA ONE AT LOS ALAMOS SCIENTIFIC LABORATORY HEALTH RESEARCH DIVISION JANUARY i976 I I I I I I I if n II 9 I I I I. I I I I STATUS AND PLANS REPORT FOR FORMER TECHNICAL AREA ONE AT LOS ALAMOS SCIENTIFIC LABORATORY INTRODUCTION Because of increased official and public concern over

  6. Status of the Broadband Heating Rate Profile (BBHRP) VAP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status of the Broadband Heating Rate Profile (BBHRP) VAP Mlawer, Eli Atmospheric & Environmental Research, Inc. Clough, Shepard Atmospheric and Environmental Research Delamere, Jennifer Atmospheric and Environmental Research, Inc. Miller, Mark Brookhaven National Laboratory Johnson, Karen Brookhaven National Laboratory Troyan, David Brookhaven National Laboratory Jensen, Michael Brookhaven National Laboratory Shippert, Timothy Pacific Northwest National Laboratory Long, Chuck Pacific

  7. High Temperature Gas-Cooled Test Reactor Options Status Report

    SciTech Connect (OSTI)

    Sterbentz, James William; Bayless, Paul David

    2015-08-01

    Preliminary scoping calculations are being performed for a 100 MWt gas-cooled test reactor. The initial design uses standard prismatic blocks and 15.5% enriched UCO fuel. Reactor physics and thermal-hydraulics simulations have been performed to identify some reactor design features to investigate further. Current status of the effort is described.

  8. ACRF Instrumentation Status: New, Current, and Future January 2007

    SciTech Connect (OSTI)

    JC Liljegren

    2007-01-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Program Climate Research Facility instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

  9. ACRF Instrumentation Status: New, Current, and Future May 2007

    SciTech Connect (OSTI)

    JC Liljegren

    2007-04-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Program Climate Research Facility instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

  10. ACRF Instrumentation Status: New, Current, and Future March 2007

    SciTech Connect (OSTI)

    JC Liljegren

    2007-03-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Program Climate Research Facility instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

  11. ACRF Instrumentation Status: New, Current, and Future October 2006

    SciTech Connect (OSTI)

    JC Liljegren

    2006-10-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Program Climate Research Facility instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

  12. ACRF Instrumentation Status: New, Current, and Future May 2007

    SciTech Connect (OSTI)

    JC Liljegren

    2007-05-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Program Climate Research Facility instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

  13. ACRF Instrumentation Status: New, Current, and Future June 2007

    SciTech Connect (OSTI)

    JC Liljegren

    2007-06-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Program Climate Research Facility instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

  14. ACRF Instrumentation Status: New, Current, and Future - September October 2007

    SciTech Connect (OSTI)

    JW Voyles

    2007-10-30

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF) instrumentation status. The report is divided into the following four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) SBIR instrument development.

  15. ACRF Instrumentation Status: New, Current, and Future February 2007

    SciTech Connect (OSTI)

    JC Liljegren

    2007-02-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Program Climate Research Facility instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development

  16. ACRF Instrumentation Status: New, Current, and Future July 2007

    SciTech Connect (OSTI)

    JC Liljegren

    2007-07-01

    The purpose of this report is to provide a concise but comprehensive overview of ACRF instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) SBIR instrument development.

  17. Neutrinoless double-{beta} decay: Status and future

    SciTech Connect (OSTI)

    Bilenky, S. M. [Joint Institute for Nuclear Research (Russian Federation)], E-mail: bilenky@he.sissa.it

    2006-12-15

    A brief summary of the status of neutrino masses, mixing, and oscillations is presented. Neutrinoless double {beta} decay is considered. Predictions for the effective Majorana mass are reviewed. A possible test of the calculations of nuclear matrix elements of the 0{nu}{beta}{beta} decay is proposed.

  18. ACRF Instrumentation Status: New, Current, and Future - November December 2007

    SciTech Connect (OSTI)

    JW Voyles

    2007-12-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

  19. ACRF Instrumentation Status: New, Current, and Future - March 2008

    SciTech Connect (OSTI)

    JW Voyles

    2008-04-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

  20. ACRF Instrumentation Status: New, Current, and Future - October November 2007

    SciTech Connect (OSTI)

    JW Voyles

    2007-11-30

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF) instrumentation status. The report is divided into the following four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) SBIR instrument development.

  1. ACRF Instrumentation Status: New, Current, and Future - February 2008

    SciTech Connect (OSTI)

    JW Voyles

    2008-03-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

  2. National Fuel Cell Vehicle Learning Demonstration: Status and Results (Presentation)

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Garbak, J.

    2009-04-22

    The objectives of this paper are: (1) validate H{sub 2} FC vehicles and infrastructure in parallel; (2) identify current status and evolution of the technology; (3) objectively assess progress toward technology readiness; and (4) provide feedback to H{sub 2} research and development.

  3. Fuel Cell Technology Status Analysis Project: Partnership Opportunities (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-11-01

    This fact sheet describes the National Renewable Energy Laboratory's (NREL's) Fuel Cell Technology Status Analysis Project. NREL is seeking fuel cell industry partners from the United States and abroad to participate in an objective and credible analysis of commercially available fuel cell products to benchmark the current state of the technology and support industry growth.

  4. Status & Direction for Onboard Hydrogen Storage | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Direction for Onboard Hydrogen Storage Status & Direction for Onboard Hydrogen Storage Presentation prepared by Andy Abele for the DOE Hydrogen Manufacturing R&D Workshop. PDF icon mfg_wkshp_abele.pdf More Documents & Publications High Pressure Hydrogen Tank Manufacturing Technical Assessment of Compressed Hydrogen Storage Tank Systems for Automotive Applications HYDROGEN TO THE HIGHWAYS

  5. Fuel Cell Technology Status Analysis Project: Partnership Opportunities

    SciTech Connect (OSTI)

    2015-09-01

    Fact sheet describing the National Renewable Energy Laboratory's (NREL's) Fuel Cell Technology Status Analysis Project. NREL is seeking fuel cell industry partners from the United States and abroad to participate in an objective and credible analysis of commercially available fuel cell products to benchmark the current state of the technology and support industry growth.

  6. Security Cases | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    status during a background interview, and (4) is currently in possession of an active passport issued by a foreign country, which may indicate that he has a p December 31, 2014...

  7. EMGeo Case Study

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    methods (QMR in one case, and IDR in the other), both solvers are dominated by memory bandwidth intensive operations like sparse matrix-vector multiply (SpMV), dot...

  8. VASP Case Study

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    VASP Case Study VASP Case Study Code description and computational problem The Vienna Ab-initio Simulation Package (VASP) [1-2] is a widely used materials science application for performing ab-initio electronic structure calculations and quantum-mechanical molecular dynamics (MD) simulations using pseudopotentials or the projector-augmented wave method and a plane wave basis set. VASP computes an approximate solution to the many-body Schrödinger equation, either within the Density Functional

  9. WARP Case Study

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WARP Case Study WARP Case Study Background WARP is an accelerator code that is used to conduct detailed simulations of particle accelerators, among other high energy physics applications. It is a so-called Particle-In-Cell (PIC) code that solves for the motion of charged particles acted upon by electric and magnetic forces. The particle motion is computed in a Lagrangian sense, following individual particles. The electric and magnetic fields acting on the particle are considered to be Eulerian

  10. Early application case studies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Early application case studies Early application case studies The Babbage test system was used to study representative applications and kernels in various scientific fields to gain experience with the challenges and strategies needed to optimize code performance on the MIC architecture. Below we highlight a few examples: BerkeleyGW The BerkeleyGW package is a materials science application that calculates electronic and optical properties with quantitative accuracy, a critical need in materials

  11. Better Buildings Case Competition

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Better Buildings Case Competition 2014 Building Technologies Office Peer Review Elena Alschuler, Elena.Alschuler@ee.Doe.Gov Department of Energy Project Summary Timeline: Start date: 2012 Planned end date: Annual event Key Milestones 9/23/13 - Student Team Registration Opened 11/11/13- Cases distributed 2/17/13 - Solution proposals due 3/14/14 - Solution proposals presented at US DOE, winners selected by industry and expert judges April 2014 - solutions posted Budget: Total DOE $ to date:

  12. Status of the MEIC ion collider ring design (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Status of the MEIC ion collider ring design Citation Details In-Document Search Title: Status of the MEIC ion collider ring design We present an update on the design of the ion...

  13. The MINERvA Experiment - A Status Report (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    The MINERvA Experiment - A Status Report Citation Details In-Document Search Title: The MINERvA Experiment - A Status Report You are accessing a document from the Department of...

  14. The MINERvA Experiment - A Status Report (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    The MINERvA Experiment - A Status Report Citation Details In-Document Search Title: The MINERvA Experiment - A Status Report Authors: Osta, Jyotsna ; Fermilab Publication Date:...

  15. Status and Trends in the U.S. Voluntary Green Power Market (2013...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Status and Trends in the U.S. Voluntary Green Power Market (2013 Data) Status and Trends in the U.S. Voluntary Green Power Market (2013 Data) The "voluntary" or "green power" ...

  16. West Valley Site History, Cleanup Status, and Role of the West...

    Office of Environmental Management (EM)

    Site History, Cleanup Status, and Role of the West Valley Citizen Task Force West Valley Site History, Cleanup Status, and Role of the West Valley Citizen Task Force Presentation...

  17. Status and Outlook for the U.S. Non-Automotive Fuel Cell Industry...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Status and Outlook for the U.S. Non-Automotive Fuel Cell Industry: Impacts of Government Policies and Assessment of Future Opportunities Status and Outlook for the U.S....

  18. 1-10 kW Stationary Combined Heat and Power Systems Status and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-10 kW Stationary Combined Heat and Power Systems Status and Technical Potential: Independent Review 1-10 kW Stationary Combined Heat and Power Systems Status and Technical...

  19. Used Fuel Disposal in Crystalline Rocks: Status and FY14 Progress...

    Office of Scientific and Technical Information (OSTI)

    Used Fuel Disposal in Crystalline Rocks: Status and FY14 Progress. Citation Details In-Document Search Title: Used Fuel Disposal in Crystalline Rocks: Status and FY14 Progress. ...

  20. File:07FDDExemptWholesaleGeneratorStatusProcess.pdf | Open Energy...

    Open Energy Info (EERE)

    FDDExemptWholesaleGeneratorStatusProcess.pdf Jump to: navigation, search File File history File usage Metadata File:07FDDExemptWholesaleGeneratorStatusProcess.pdf Size of this...

  1. Single casing reheat turbine

    SciTech Connect (OSTI)

    Matsushima, Tatsuro; Nishimura, Shigeo

    1999-07-01

    For conventional power plants, regenerative reheat steam turbines have been accepted as the most practical method to meet the demand for efficient and economical power generation. Recently the application of reheat steam turbines for combined cycle power plant began according to the development of large-capacity high temperature gas turbine. The two casing double flow turbine has been applied for this size of reheat steam turbine. The single casing reheat turbine can offer economical and compact power plant. Through development of HP-LP combined rotor and long LP blading series, Mitsubishi Heavy Industries, Ltd. had developed a single casing reheat steam turbine series and began to use it in actual plants. Six units are already in operation and another seven units are under manufacturing. Multiple benefits of single casing reheat turbine are smaller space requirements, shorter construction and erection period, equally good performance, easier operation and maintenance, shorter overhaul period, smaller initial investment, lower transportation expense and so on. Furthermore, single exhaust steam turbine makes possible to apply axial exhaust type, which will lower the height of T/G foundation and T/G housing. The single casing reheat turbine has not only compact and economical configuration itself but also it can reduce the cost of civil construction. In this paper, major developments and design features of the single casing reheat turbine are briefly discussed and operating experience, line-up and technical consideration for performance improvement are presented.

  2. Technosocial Modeling for Determining the Status and Nature of a States Nuclear Activities

    SciTech Connect (OSTI)

    Gastelum, Zoe N.; Harvey, Julia B.

    2009-09-25

    The International Atomic Energy Agency State Evaluation Process: The Role of Information Analysis in Reaching Safeguards Conclusions (Mathews et al. 2008), several examples of nonproliferation models using analytical software were developed that may assist the IAEA with collecting, visualizing, analyzing, and reporting information in support of the State Evaluation Process. This paper focuses on one of the examples a set of models developed in the Proactive Scenario Production, Evidence Collection, and Testing (ProSPECT) software that evaluates the status and nature of a states nuclear activities. The models use three distinct subject areas to perform this assessment: the presence of nuclear activities, the consistency of those nuclear activities with national nuclear energy goals, and the geopolitical context in which those nuclear activities are taking place. As a proof-of-concept for the models, a crude case study was performed. The study, which attempted to evaluate the nuclear activities taking place in Syria prior to September 2007, yielded illustrative, yet inconclusive, results. Due to the inconclusive nature of the case study results, changes that may improve the models efficiency and accuracy are proposed.

  3. Waste Management facilities fault tree databank 1995 status report

    SciTech Connect (OSTI)

    Minnick, W.V.; Wellmaker, K.A.

    1995-08-16

    The Safety Information Management and Analysis Group (SIMA) of the Safety Engineering Department (SED) maintains compilations of incidents that have occurred in the Separations and Process Control, Waste Management, Fuel Fabrication, Tritium and SRTC facilities. This report records the status of the Waste Management (WM) Databank at the end of CY-1994. The WM Databank contains more than 35,000 entries ranging from minor equipment malfunctions to incidents with significant potential for injury or contamination of personnel. This report documents the status of the WM Databank including the availability, training, sources of data, search options, Quality Assurance, and usage to which these data have been applied. Periodic updates to this memorandum are planned as additional data or applications are acquired.

  4. A Case for Climate Neutrality: Case Studies on Moving Towards...

    Open Energy Info (EERE)

    TOOL Name: A Case for Climate Neutrality: Case Studies on Moving Towards a Low Carbon Economy AgencyCompany Organization: United Nations Environment Programme (UNEP) Sector:...

  5. Status of LHC crab activity simulations and beam studies

    SciTech Connect (OSTI)

    Calaga,R.; Assman, R.; Barranco, J.; Barranco, J.; Calaga, R.; Caspers, F.; Ciapala, E.; De-Maria, R.; Koutchouk, J. P.; Linnecar, T.; Metral, E.; Morita, A.; Solyak, N.; Sun, Y.; Tomas, R.; Tuckmantel, J.; Weiler, T.; Zimmermann, F.

    2009-05-04

    The LHC crab cavity program is advancing rapidly towards a first prototype which is anticipated to be tested during the early stages of the LHC phase I upgrade and commissioning. The general project status and some aspects related to crab optics, collimation, aperture constraints, impedances, noise effects. beam transparency and machine protection critical for a safe and robust operation of LHC beams with crab cavities are addressed here.

  6. ACRF Instrumentation Status: New, Current, and Future - January 2009

    SciTech Connect (OSTI)

    JW Voyles

    2009-03-02

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  7. ARM Climate Research Facility Instrumentation Status and Information April 2010

    SciTech Connect (OSTI)

    Voyles, JW

    2010-05-15

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  8. ARM Climate Research Facility Instrumentation Status and Information February 2010

    SciTech Connect (OSTI)

    Voyles, JW

    2010-03-25

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  9. ACRF Instrumentation Status: New, Current, and Future July 2006

    SciTech Connect (OSTI)

    JC Liljegren

    2006-07-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Program Climate Research Facility instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development. New information is highlighted in blue text.

  10. ACRF Instrumentation Status: New, Current, and Future August 2006

    SciTech Connect (OSTI)

    JC Liljegren

    2006-08-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Program Climate Research Facility instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development. New information is highlighted in blue text.

  11. ACRF Instrumentation Status: New, Current, and Future September 2006

    SciTech Connect (OSTI)

    JC Liljegren

    2006-09-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Program Climate Research Facility instrumentation status. The report is divided into four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development. New information is highlighted in blue text.

  12. ARM Climate Research Facility Instrumentation Status and Information December 2009

    SciTech Connect (OSTI)

    JW Voyles

    2010-12-30

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  13. ARM Climate Research Facility Instrumentation Status and Information October 2009

    SciTech Connect (OSTI)

    JW Voyles

    2009-10-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  14. ARM Climate Research Facility Instrumentation Status and Information January 2010

    SciTech Connect (OSTI)

    JW Voyles

    2010-02-28

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  15. ACRF Instrumentation Status: New, Current, and Future March 2009

    SciTech Connect (OSTI)

    JW Voyles

    2009-03-15

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  16. ARM Climate Research Facility Instrumentation Status and Information March 2010

    SciTech Connect (OSTI)

    Voyles, JW

    2010-04-19

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  17. ACRF Instrumentation Status: New, Current, and Future February 2009

    SciTech Connect (OSTI)

    JW Voyles

    2009-02-15

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  18. Voltage Fade, an ABR Deep Dive Project: Status and Outcomes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Voltage Fade, an ABR Deep Dive Project: Status and Outcomes Project ID: ES161 Anthony Burrell Voltage Fade Team Annual Merit Review Washington DC, June 16-20, 2014 This presentation does not contain any proprietary, confidential, or otherwise restricted information. 2 Overview Timeline * Start: October 1, 2012 * End: Sept. 30, 2014 * Percent complete: 75% Budget * Voltage Fade project * $3,900K Barriers * Calendar/cycle life of lithium-ion cells being developed for PHEV and EV batteries that

  19. Panel 1, Hawaii Hydrogen Projects Status & Lessons Learned

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Projects Status & Lessons Learned Mitch Ewan Hydrogen Systems Program Manager Hawaii Natural Energy Institute School of Ocean Earth Science and Technology University of Hawaii at Manoa 14 May 2014 2 Hawaii Natural Energy Institute Organized Research Unit in the School of Ocean and Earth Science and Technology, University of Hawaii at Manoa Alternative Fuels: Biomass and biofuels Electrochemical Power Systems Fuels Cells, Batteries Renewable Power Generation Ocean Energy

  20. ACRF Instrumentation Status: New, Current, and Future - June 2008

    SciTech Connect (OSTI)

    JW Voyles

    2008-07-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  1. ACRF Instrumentation Status: New, Current, and Future - August 2008

    SciTech Connect (OSTI)

    JW Voyles

    2008-09-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  2. ACRF Instrumentation Status: New, Current, and Future - July 2008

    SciTech Connect (OSTI)

    JW Voyles

    2008-07-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  3. ACRF Instrumentation Status: New, Current, and Future - April 2008

    SciTech Connect (OSTI)

    JW Voyles

    2008-05-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  4. ACRF Instrumentation Status: New, Current, and Future - December 2008

    SciTech Connect (OSTI)

    JW Voyles

    2009-01-15

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  5. ACRF Instrumentation Status: New, Current, and Future - October 2008

    SciTech Connect (OSTI)

    JW Voyles

    2008-10-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  6. ACRF Instrumentation Status: New, Current, and Future - May 2008

    SciTech Connect (OSTI)

    JW Voyles

    2008-05-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  7. ACRF Instrumentation Status: New, Current, and Future - November 2008

    SciTech Connect (OSTI)

    JW Voyles

    2008-12-01

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  8. ACRF Instrumentation Status: New, Current, and Future - September 2008

    SciTech Connect (OSTI)

    JW Voyles

    2008-10-15

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  9. ARM Climate Research Facility Quarterly Ingest Status Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5-092 ARM Climate Research Facility Quarterly Ingest Status Report A Koontz C Sivaraman October 2015 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would

  10. Nuclear Safety Research and Development Status Workshop Summary

    Office of Environmental Management (EM)

    NSR&D STATUS WORKSHOP SUMMARIES Caroline Garzon Chief of Nuclear Safety Staff NUCLEAR SAFETY R&D  Perform a peer review of Risk Assessment Corporation WTP analysis by a team and identify  Using other benchmarked dispersion codes, determine appropriate input parameters (including deposition velocity) for 95 th percentile analysis using MACCS2 code by considering representative DOE Sites. EFCOG SAFETY ANALYSIS WORKSHOP Large interest in dispersion modeling topics  Presentations in

  11. Microsoft PowerPoint - Denison Status.ppt [Compatibility Mode]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DENISON TURBINE REHABILITATION PLANNING REHABILITATION PLANNING Status Report Southwestern Federal Hydropower Conference 10 June 2010 By: Charlie Allen Chief, Turbomachinery Section y Hydroelectric Design Center US Army Corps of Engineers BUILDING STRONG ® Historic Context Historic Context Late 1990's: Index Testing, 4% Efficiency Decrease g y Early 2000's: Generator Uprate Study Mid 2000's: Generator Rewinds Completed Capacity increase from 42.3 KVA to 53.5 KVA Capacity increase from 42.3 KVA

  12. ARM - History and Status of the ARM Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARMHistory and Status of the ARM Program About Become a User Recovery Act Mission FAQ Outreach Displays History Organization Participants Facility Statistics Forms Contacts Facility Documents ARM Management Plan (PDF, 1.3MB) Field Campaign Guidelines (PDF, 574KB) ARM Climate Research Facility Expansion Workshop (PDF, 1.46MB) Facility Activities ARM and the Recovery Act Contributions to International Polar Year Comments? We would love to hear from you! Send us a note below or call us at

  13. September 2012, 10 CFR 851 Work Group Status Overview

    Energy Savers [EERE]

    10 CFR 851 Work Group Status Overview Accomplishments: 1. March 2012. 10 CFR 851 Workshop was held in conjunction with the 2012 Chemical Management Workshop. 2. Communication tools to enhance 10 CFR 851 Worker Safety and Health Program (WSHP) compliance updated: Requirements checklist distributed across DOE complex and on the 10 CFR 851 website; DOE Guide 440.1-1B to include technical clarifications. 3. Aug 7. A WG teleconference to reconfirm the actions described in the charter and to discuss

  14. September 2012, Work Force Retention Work Group Status Overview

    Energy Savers [EERE]

    Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 [Protective Force Personnel Medical, Physical Readiness, Training, and Access Authorization Standards] as a final rule that includes modification efforts to address barriers to workforce retention. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce

  15. Status of the Application of Thermoelectric Technology in Vehicles |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy the Application of Thermoelectric Technology in Vehicles Status of the Application of Thermoelectric Technology in Vehicles 2004 Diesel Engine Emissions Reduction (DEER) Conference Presentation: BSST LLC PDF icon 2004_deer_bell.pdf More Documents & Publications Role of Thermoelectrics in Vehicle Efficiency Increase Potential Thermoelectric Applications in Diesel Vehicles Potential of Thermoelectrics forOccupant Comfort and Fuel Efficiency Gains in Vehicle

  16. Pinoleville Pomo Nation Renewable Energy Feasibility Study Final Status

    Energy Savers [EERE]

    Final Status Zack Sampsel Environmental Director, Pinoleville Pomo Nation 2014 U.S. Department of Energy Tribal Energy Program Review March 25, 2014 Pinoleville Pomo Nation * The Pinoleville Pomo Nation is a Native American tribe located in Mendocino County Mission Statement of the Pinoleville Pomo Nation * Secures tribal government, affirms and protects tribal sovereignty * Maintains government-to- government relationships * Dedication to developing and maintaining co-operative alliances that

  17. Pinoleville Pomo Nation Renewable Energy Feasibility Study Status

    Energy Savers [EERE]

    Status Deborah Smith Environmental Outreach Coordinator, Pinoleville Pomo Nation Ryan Shelby Program Manager, Community Assessment of Renewable Energy & Sustainability (CARES) 2011 U.S. Department of Energy Tribal Energy Program Review November 15, 2011 Pinoleville Pomo Nation * The Pinoleville Pomo Nation is a Native American tribe located in Mendocino County Mission Statement of the Pinoleville Pomo Nation * Secures tribal government, affirms and protects tribal sovereignty * Maintains

  18. Pinoleville Pomo Nation Renewable Energy Feasibility Study Status

    Energy Savers [EERE]

    Pinoleville Pomo Nation Renewable Energy Feasibility Study Status David Edmunds Environmental Director, Pinoleville Pomo Nation Ryan Shelby Alfred P. Sloan Ph.D. Student Scholar, UC Berkeley 2009 U.S. Department of Energy Tribal Energy Program Review November 18, 2009 2 * Self-sufficiency * Job creation * Revenue creation * Cultural integrity Strategic Plan 3 * Choose energy technologies that reflect cultural values * Small-scale, multi-source energy to maintain flexibility and resilience *

  19. Pinoleville Pomo Nation Renewable Energy Feasibility Study Status Report

    Energy Savers [EERE]

    Pinoleville Pomo Nation Renewable Energy Feasibility Study Lenora Steele Status Report Self-Governance Coordinator David Edmunds Environmental Director PPN Mission and Vision Renewable Energy Feasibility Study: Overview Project Duration: May 2010- September 2011 Focus areas: - micro-hydroelectric, - geothermal heat pumps, * * - wind, - solar electric, - solar thermal * Primary Objective: - Deployment and development plan that has the renewable energy options and designs that meets the PPN's

  20. Quinault Indian Nation 2104 Comprehensive Biomass Strategy Project Status Report

    Energy Savers [EERE]

    2014 Comprehensive Biomass Strategy Project Status Report 2014 Department of Energy Program Review Project Overview * Identify and confirm Tribal energy needs * Comprehensive review of QIN biomass availability* * Develop a biomass energy vision statement, goals and objectives * Identify and assess viable biomass energy options, both demand-side that reduce energy consumption, and supply-side that generate heat and/or energy * Develop a long-term biomass strategy consistent with the long-term

  1. July 2012, 10 CFR 851 Work Group Status Overview

    Office of Environmental Management (EM)

    10 CFR 851 Work Group Status Overview Accomplishments: 1. March 2012. 10 CFR 851 Workshop was held in conjunction with the 2012 Chemical Management Workshop. 2. Communication tools to enhance 10 CFR 851 Worker Safety and Health Program (WSHP) compliance updated: Requirements checklist distributed across DOE complex and on the 10 CFR 851 website; DOE Guide 440.1-1B to include technical clarifications. Near Term Goals/Activities: 1. Samples of acceptable WSHP programs (including ones based on ISM)

  2. July 2012, Work Force Retention Work Group Status Overview

    Office of Environmental Management (EM)

    Work Force Retention Work Group Status Overview Accomplishments: 1. Progress on the completion of the 10 CFR 1046 modifications to address barriers to workforce retention. Written response to public comment is being drafted by HS-51. 2. Pro-Force (PF) union representative, Randy Lawson, identified this accomplishment as the single most significant step toward PF workforce retention in over 20 years. 3. Draft re-charter of PF Career Options Committee (PFCOC) to establish a PF Working Group

  3. 2009 Annual Inspection and Status Report for the

    Office of Legacy Management (LM)

    4 Annual Inspection - Hallam, Nebraska May 2014 Page 1 2014 Annual Inspection and Status Report for the Hallam, Nebraska, Decommissioned Reactor Site Summary The former Hallam Nuclear Power Facility (HNPF) was inspected on April 8, 2014. The IHX building and the grass cover on the foundation of the former reactor building were in good condition. No cause for a follow-up inspection was identified. There are 19 groundwater monitoring wells at the Hallam site. Four of the 19 wells are flush mount

  4. 2009 Annual Inspection and Status Report for the

    Office of Legacy Management (LM)

    5 Annual Inspection - Hallam, Nebraska May 2015 Page 1 2015 Annual Inspection and Status Report for the Hallam, Nebraska, Decommissioned Reactor Site Summary The former Hallam Nuclear Power Facility (HNPF) was inspected on April 9, 2015. The IHX building and the grass cover on the foundation of the former reactor building were in good condition. No cause for a follow-up inspection was identified. Groundwater is sampled every two years, and was last sampled in June 2014. Results were not

  5. ATLAS experimental equipment. November 1983 workshop and present status

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    The latest workshop was held in November 1983 with the purpose of presenting an overview of the experimental stations planned for ATLAS, describing the current status of each individual apparatus, soliciting final input on devices of the first phase (i.e. on those that will be ready when beams from ATLAS become available in late Spring of 1985), and discussing and collecting new ideas on equipment for the second phase. There were short presentations on the status of the various projects followed by informal discussions. The presentations mainly concentrated on new equipment for target area III, but included some descriptions of current apparatus in target area II that might also be of interest for experiments with the higher-energy beams available in area III. The meeting was well attended with approx. 50 scientists, approximately half of them from institutions outside Argonne. The present proceedings summarize the presentations and discussions of this one-day meeting. In addition we take the opportunity to include information about developments since this meeting and an update of the current status of the various experimental stations. We would like to emphasize again that outside-user input is extremely welcome.

  6. Fuel Cell Technology Status Analysis Project: Partnership Opportunities (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-06-01

    This fact sheet describes National Renewable Energy Laboratory's (NREL's) Fuel Cell Technology Status Analysis Project. NREL is seeking fuel cell industry partners from the United States and abroad to participate in an objective and credible analysis of commercially available fuel cell products to benchmark the current state of the technology and support industry growth. Participating fuel cell developers share price information about their fuel cell products and/or raw fuel cell test data related to operations, maintenance, and safety with NREL via the Hydrogen Secure Data Center (HSDC). The limited-access, off-network HSDC houses the data and analysis tools to protect proprietary information. NREL shares individualized data analysis results as detailed data products (DDPs) with the partners who supplied the data. Aggregated results are published as composite data products (CDPs), which show the technology status without identifying individual companies. The CDPs are a primary benchmarking tool for the U.S. Department of Energy and other stakeholders interested in tracking the status of fuel cell technologies. They highlight durability advancements, identify areas for continued development, and help set realistic price expectations at small-volume production.

  7. In Case of Emergency

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In Case of Emergency In Case of Emergency Print Fire/Police Emergency: ext. 7911 Cell phone or off-site: 510-486-7911 When dialing from off-site, the following numbers need to be proceeded by 486-. the area code for the LBNL is (510). Fire Department (non-emergency): ext. 6015 Police Department (non-emergency): ext. 5472 Non-Emergency Reporting: ext. 6999 Additional information about emergency procedures at Berkeley Lab can be found on the red Emergency Response Guides posted around the lab and

  8. Geothermal Case Studies

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Young, Katherine

    database.) In fiscal year 2015, NREL is working with universities to populate additional case studies on OpenEI. The goal is to provide a large enough dataset to start conducting analyses of exploration programs to identify correlations between successful exploration plans for areas with similar geologic occurrence models.

  9. Fuel Cell Case Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Kathy Loftus Global Leader, Sustainable Engineering, Maintenance & Energy Management Whole Foods Market, Inc. Fuel Cell Case Study 2 Holistic Approach from Development to Operation WFM Energy Management Negotiation Awareness Load Shaping Engineering Refrigeration HVAC Electrical Maintenance Performance Based Retailers Operational Practices Store Design & Construction Consultants Specifications Procurement Equipment Selection Life Cycle Costing Energy & Maintenance team can feedback

  10. Geothermal Case Studies

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Young, Katherine

    2014-09-30

    database.) In fiscal year 2015, NREL is working with universities to populate additional case studies on OpenEI. The goal is to provide a large enough dataset to start conducting analyses of exploration programs to identify correlations between successful exploration plans for areas with similar geologic occurrence models.

  11. Process development status report for advanced manufacturing projects

    SciTech Connect (OSTI)

    Brinkman, J.R.; Homan, D.A.

    1990-03-30

    This is the final status report for the approved Advanced Manufacturing Projects for FY 1989. Five of the projects were begun in FY 1987, one in FY 1988, and one in FY 1989. The approved projects cover technology areas in welding, explosive material processing and evaluation, ion implantation, and automated manufacturing. It is expected that the successful completion of these projects well result in improved quality and/or reduced cost for components produced by Mound. Those projects not brought to completion will be continued under Process development in FY 1990.

  12. Hydrogen Home Refueling: Status, Key Issues, and Challenges

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electrolytic Hydrogen Production Workshop NREL, Golden, Colorado Hydrogen Home Refueling Status, Ke y Issue s, and Challenges Cortney Mittelsteadt VP, Technology Giner, Inc. February 27-28 th , 2014 89 Rum ford Ave, Newton, Ma. 02466 Based on Forecourt H2A Model (Ver. 3.0) H 2 Production Cost Contribution DOE Target Home Refueler  requirement for H70 hydrogen refu  6,250 psig)     meet 2020 target for H70 ref *M echani cal Com pressor not requi red for H35 refuel i ng. Com

  13. Status of regional superfund pilots: End-of-year report

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    In 1991 and 1992, the Office of Solid Waste and Emergency Response (OSWER) began major efforts to streamline and accelerate Superfund response activities. In a statement on October 2, 1991, the USEPA Administrator approved the Superfund 30-Day Task Force Implementation Plan (October 1, 1991) which identified aggressive cleanup targets and strategies for streamlining and 'revitalizing' the Superfund process. Following this Introduction, Part II of the report contains an index of pilot activities and key contacts; Part III provides abstracts on each pilot; and Part IV describes in detail the goals of each pilot, its status, evaluation plan, and results to date.

  14. Worldwide status of energy standards for buildings: Appendices

    SciTech Connect (OSTI)

    Janda, K.B.; Busch, J.F.

    1993-02-01

    This informal survey was designed to gain information about the worldwide status of energy efficiency standards for buildings, particularly non-residential buildings such as offices, schools, and hotels. The project has three goals: 1. To understand and learn from the experience of countries with existing building energy standards; 2. To locate areas where these lessons might be applied and energy standards might be effectively proposed and developed; and 3. To share the information gathered with all participating countries. These appendices include the survey cover letter, the survey, and the details of selected energy standards in 35 countries, thus providing supporting material for the authors` article of the same title.

  15. Ceramic-based fuel technologies: scope and status

    SciTech Connect (OSTI)

    Mcclellan, Kenneth J

    2010-12-16

    This presentation is an overview of the approach, status and path forward for ongoing tasks under the ceramic fuel development part of the program. Experimental work is focused on fundamental studies employing depleted urania-based compositions and mixed oxide (MOX) and minor actinide-bearing MOX. Contributions are included from researchers at LANL, ORNL and BNL. The audience for this presentation consists of the various participants in the FCRD program. Those participants include representatives from: DOE-NE, other national laboratories, DOE funded university researchers, DOE funded industry teams, FCRD funded advisors, and occasionally NRC.

  16. Status of the ATF Damping Ring BPM Upgrade Project

    SciTech Connect (OSTI)

    Briegel, C.; Eddy, N.; Haynes, B.; May, J.; McCormick, D.; Nelson, J.; Nicklaus, D.; Prieto, P.; Rechenmacher, R.; Smith, T.; Teranuma, N.; Urakawa, J.; Voy, D.; Wendt, M.; Woodley, M.; /SLAC

    2011-12-01

    A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it's finalization are presented.

  17. FY15 Status Report on NEAMS Neutronics Activities

    SciTech Connect (OSTI)

    Lee, C. H.; Shemon, E. R.; Smith, M. A.; Connaway, H. M.; Aliberti, G.

    2015-09-30

    This report summarizes the current status of NEAMS activities in FY2015. The tasks this year are (1) to improve solution methods for steady-state and transient conditions, (2) to develop features and user friendliness to increase the usability and applicability of the code, (3) to improve and verify the multigroup cross section generation scheme, (4) to perform verification and validation tests of the code using SFRs and thermal reactor cores, and (5) to support early users of PROTEUS and update the user manuals.

  18. COLLOQUIUM: W7-X Status Report | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 12, 2015, 4:15pm to 5:30pm Colloquia MBG AUDITORIUM COLLOQUIUM: W7-X Status Report Dr. Thomas Sunn Pedersen Max Planck Institute of Plasma Physics Presentation: File Overview_plans_1stresults_W7-X.pptx The world's most advanced stellarator, Wendelstein 7-X, located in Greifswald, Germany, is rapidly approaching first plasma operation. Its purpose is to demonstrate the fusion reactor relevance of the optimized stellarator. The experiment is built for steady-state operation, featuring 70

  19. Status of the AFP project in the ATLAS experiment

    SciTech Connect (OSTI)

    Taevsk, Marek

    2015-04-10

    Status of the AFP project in the ATLAS experiment is summarized. The AFP system is composed of a tracker to detect intact, diffractively scattered protons, and of a time-of-flight detector serving to suppress background from pile-up interactions. The whole system, located around 210?m from the main ATLAS detector, is placed in Roman Pots which move detectors from and to the incident proton beams. A typical distance of the closest approach of the tracker to these beams is 23?mm. The main physics motivation lies in measuring diffractive processes in runs with not a very high amount of pile-up.

  20. Groundwater Level Status Report for 2005 Los Alamos National Laboratory

    SciTech Connect (OSTI)

    S.P. Allen; R.J. Koch

    2006-05-15

    The status of groundwater level monitoring at Los Alamos National Laboratory (LANL) in 2005 is provided in this report. The Groundwater Level Monitoring Project was instituted in 2005 to provide a framework for the collection and processing of quality controlled groundwater level data. This report summarizes groundwater level data for 137 monitoring wells, including 41 regional aquifer wells, 22 intermediate wells, and 74 alluvial wells. Pressure transducers were installed in 118 monitoring wells for continuous monitoring of groundwater levels. Time-series hydrographs of groundwater level data are presented along with pertinent construction and location information for each well.

  1. The Status of Clean Energy in the United States

    Energy Savers [EERE]

    The Status of Clean Energy in the United States Tribal Energy Program Review May 6, 2015 Travis Lowder, NREL 2 Lazard's Levelized Cost of Energy (LCOE) Estimates Source: Lazard 2013 3 Lazard's Capital Cost Estimates Source: Lazard 2013 4 EIA Estimates (2012 data) 5 Solar PV 6 Solar PV Installed Capacity and Weighted Average System Cost $0 $2 $4 $6 $8 $10 $12 0 1000 2000 3000 4000 5000 6000 7000 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Wtd. Avg. System Price ($/W)

  2. Current Status of the WArP Experiment

    SciTech Connect (OSTI)

    Szelc, A. M.

    2009-04-17

    The WArP Collaboration is getting ready to run the WArP 100 liter detector in the Underground laboratory in Gran Sasso, Italy. The new detector, scheduled to run in 2008, should improve the current sensitivity limits by a factor of 10. Meanwhile, an active R and D program is being conducted. The highlights of this program, namely the runs with Argon depleted in the radioactive isotope {sup 39}Ar currently in preparation and the measurements of the effects of contamination with Nitrogen and Oxygen on the Liquid Argon effective light yield will be presented as well as the current status of the 100 liter detector.

  3. 2009 Annual Inspection and Status Report for the

    Office of Legacy Management (LM)

    Hallam, Nebraska May 2013 Page 1 2013 Annual Inspection and Status Report for the Hallam, Nebraska, Decommissioned Reactor Site Summary The former Hallam Nuclear Power Facility (HNPF) was inspected on May 1, 2013. The IHX building and the grass cover on the foundation of the former reactor building, were in good condition. No cause for a follow-up inspection was identified. There are 19 groundwater monitoring wells at the Hallam site. Four of the 19 wells are flush mount in design and are locked

  4. FES Case Study Worksheets

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Worksheets FES Case Study Worksheets This workshop is closed, and the worksheets can no longer be edited. If you have questions, please report any problems or suggestions for improvement to Richard Gerber (ragerber@lbl.gov). Please choose your worksheet template: Lee Berry, Paul Bonoli, David Green [Read] Jeff Candy [Read] CS Chang [Read] Stephane Ethier [Read] Alex Friedman [Read] Kai Germaschewski [Read] Martin Greenwald [Read] Stephen Jardin [Read] Charlson Kim [Read] Scott Kruger [Read]

  5. Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada

    SciTech Connect (OSTI)

    Jeremy Gwin and Douglas Frenette

    2010-09-30

    This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values and corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or clean, building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, Final Status Survey Plan for Corrective Action Unit 117 Pluto Disassembly Facility, Building 2201) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room into one of three categories: Class 1, Class 2 or Class 3 (a fourth category is a Non-Impacted Class which in the case of Building 2201 only pertained to exterior surfaces of the building.) The majority of the rooms were determined to fall in the less restrictive Class 3 category, however, Rooms 102, 104, 106, and 107 were identified as containing Class 1 and 2 areas. Building 2201 was divided into survey units and surveyed following the requirements of the Final Status Survey Plan for each particular class. As each survey unit was completed and documented, the survey results were evaluated. Each sample (static measurement) with units of counts per minute (cpm) was corrected for the appropriate background and converted to a value with units of dpm/100 cm2. With a surface contamination value in the appropriate units, it was compared to the surface contamination limits, or in this case the derived concentration guideline level (DCGLw). The appropriate statistical test (sign test) was then performed. If the survey unit was statistically determined to be below the DCGLw, then the survey unit passed and the null hypothesis (that the survey unit is above limits) was rejected. If the survey unit was equal to or below the critical value in the sign test, the null hypothesis was not rejected. This process was performed for all survey units within Building 2201. A total of thirty-three Class 1, four Class 2, and one Class 3 survey units were developed, surveyed, and evaluated. All survey units successfully passed the statistical test. Building 2201 meets the release criteria commensurate with the Waste Acceptance Criteria (for radiological purposes) of the U10C landfill permit residing within NNSS boundaries. Based on the thorough statistical sampling and scanning of the buildings interior, Building 2201 may be considered radiologically clean, or free of contamination.

  6. Status of the DOE Battery and Electrochemical Technology Program V

    SciTech Connect (OSTI)

    Roberts, R.

    1985-06-01

    The program consists of two activities, Technology Base Research (TBR) managed by the Lawrence Berkeley Laboratory (LBL) and Exploratory Technology Development and Testing (EDT) managed by the Sandia National Laboratories (SNL). The status of the Battery Energy Storage Test (BEST) Facility is presented, including the status of the batteries to be tested. ECS program contributions to the advancement of the lead-acid battery and specific examples of technology transfer from this program are given. The advances during the period December 1982 to June 1984 in the characterization and performance of the lead-acid, iron/nickel-oxide, iron/air, aluminum/air, zinc/bromide, zinc/ferricyanide, and sodium/sulfur batteries and in fuel cells for transport are summarized. Novel techniques and the application of established techniques to the study of electrode processes, especially the electrode/electrolyte interface, are described. Research with the potential of leading to improved ceramic electrolytes and positive electrode container and current-collectors for the sodium/sulfur battery is presented. Advances in the electrocatalysis of the oxygen (air) electrode and the relationship of these advances to the iron/air and aluminum/air batteries and to the fuel cell are noted. The quest for new battery couples and battery materials is reviewed. New developments in the modeling of electrochemical cell and electrode performance with the approaches to test these models are reported.

  7. Indian Renewable Energy Status Report: Background Report for DIREC 2010

    SciTech Connect (OSTI)

    Arora, D. S.; Busche, S.; Cowlin, S.; Engelmeier, T.; Jaritz, J.; Milbrandt, A.; Wang, S.

    2010-10-01

    India has great potential to accelerate use of endowed renewable resources in powering its growing economy with a secure and affordable energy supply. The Government of India recognizes that development of local, renewable resources will be critical to ensure that India is able to meet both economic and environmental objectives and has supported the development of renewable energy through several policy actions. This paper describes the status of renewable energy in India as of DIREC 2010. It begins by describing the institutional framework guiding energy development in India, the main policy drivers impacting energy, and the major policy actions India has taken that impact renewable energy deployment. The paper presents estimates of potential for wind, solar, small hydro, and bioenergy and the deployment of each of these technologies to date in India. The potential for India to meet both large-scale generation needs and provide access to remote, unelectrified populations are covered. Finally, the enabling environment required to facilitate rapid scale of renewables is discussed, including issues of technology transfer and the status of financing in India.

  8. Using Whole Building Performance Measurement to Develop a Business Case

    SciTech Connect (OSTI)

    Fowler, Kimberly M.

    2006-09-15

    Since 1998 the U.S. Navy?s Naval Facilities Engineering Command (NAVFAC) has had a policy for incorporating sustainable design principles into new building construction. The policy also states it is the intent of NAVFAC to accomplish this within the given budget constraints and while meeting customer requirements. Programming a building using a first cost approach instead of a life cycle cost approach is one of the biggest challenges for integrating sustainable design into projects at the Navy. Due to this hurdle, an attempt to develop a Navy specific business case was undertaken. Through this process, it was discovered that consistent data were not being collected for all applicable Navy buildings. Therefore, the current business case information being used by the Navy is the conglomeration of existing business case analysis in the literature. Although this business case information is useful, there is still a need for collecting and analyzing the Navy business case. To develop the Navy specific business case, NAVFAC is developing program metrics to capture the status of buildings in the design and construction phase and they have started to collect whole building cost and performance data for 14 buildings (7 sustainably designed and 7 traditionally designed buildings) to capture data on their existing inventory of sustainably design buildings. Performance measurement data are being collected on water, energy, operations and maintenance, waste generation, purchasing, occupant satisfaction, and transportation. The building cost and performance data will be collected for a minimum of 12 months. Both of these data collection and analysis efforts have offered lessons learned that will be shared alongside the current Navy business case information.

  9. Waste Management at the Nevada Test Site Year 2002: Current Status

    SciTech Connect (OSTI)

    Becker, Bruce, D.; Gertz, Carl, P.; Clayton, Wendy, A.; Carilli, Jhon, T.; Crowe, Bruce M.

    2003-02-24

    The performance attributes of the U. S. Department of Energy's National Nuclear Security Administration Nevada Site Office Low-level Radioactive Waste (LLW) disposal facilities located at the Nevada Test Site transcend those of any other LLW disposal site in the United States. Situated at the southern end of the Great Basin, 244 meters (800 feet) above the water table, the Area 5 Radioactive Waste Management Site (RWMS) has utilized a combination of engineered shallow land disposal cells and deep augured shafts to dispose a variety of waste streams. These include high volume low-activity waste, classified material, and high-specific activity special case waste. Fifteen miles north of Area 5 is the Area 3 RWMS. Here bulk LLW disposal takes place in subsidence craters formed from underground testing of nuclear weapons. Earliest records indicate that documented LLW disposal activities have occurred at the Area 5 and Area 3 RWMSs since 1961 and 1968, respectively. However, these activities have only been managed under a formal program since 1978. This paper describes the technical attributes of the facilities, present and future capacities and capabilities, and provides a description of the process from waste approval to final disposition. The paper also summarizes the current status of the waste disposal operations.

  10. Low-level radioactive waste management at the Nevada Test Site -- Current status

    SciTech Connect (OSTI)

    Becker, B.D.; Crowe, B.M.; Gertz, C.P.; Clayton, W.A.

    1999-04-01

    The performance objectives of the Department of Energy`s Low-Level Radioactive Waste (LLW) disposal facilities located at the Nevada Test Site transcend those of any other radioactive waste disposal site in the US. Situated at the southern end of the Great Basin, 800 feet above the water table, the Area 5 Radioactive Waste Management Site (RWMS) has utilized a combination of engineered shallow land disposal cells and deep augured shafts to dispose a variety of waste streams. These include high volume low-activity wastes, classified materials, and high-specific-activity special case wastes. Twenty miles north of Area 5 is the Area 3 RWMS. Here bulk LLW disposal takes place in subsidence craters formed from underground testing of nuclear weapons. Earliest records indicate that documented LLW disposal activities have occurred at the Area 5 and Area 3 RWMS`s since 1961 and 1968, respectively. However, these activities have only been managed under a formal program since 1978. This paper describes the technical attributes of the facilities, present and future capacities and capabilities, and provides a description of the process from waste approval to final disposition. The paper also summarizes the current status of the waste disposal operations.

  11. Waste Management at the Nevada Test Site Fiscal Year 2001 Current Status

    SciTech Connect (OSTI)

    B. D. Becker; W. A. Clayton; B. M. Crowe

    2002-05-01

    The performance objectives of the U. S. Department of Energy's National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Low-level Radioactive Waste (LLW) disposal facilities located at the Nevada Test Site transcend those of any other radioactive waste disposal site in the United States. Situated at the southern end of the Great Basin, 244 meters (800 feet) above the water table, the Area 5 Radioactive Waste Management Site (RWMS) has utilized a combination of engineered shallow land disposal cells and deep augured shafts to dispose a variety of waste streams. These include high volume low-activity waste, classified radioactive material, and high-specific-activity special case waste. Fifteen miles north of Area 5 is the Area 3 RWMS. Here bulk LLW disposal takes place in subsidence craters formed from underground testing of nuclear weapons. Earliest records indicate that documented LLW disposal activities have occurred at the Area 5 and Area 3 RWMSs since 1961 and 1 968, respectively. However, these activities have only been managed under a formal program since 1978. This paper describes the technical attributes of the facilities, present and future capacities and capabilities, and provides a description of the process from waste approval to final disposition. The paper also summarizes the current status of the waste disposal operations.

  12. The Status of Renewable Hydrogen and Energy Station Technologies and Policy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recommendations | Department of Energy The Status of Renewable Hydrogen and Energy Station Technologies and Policy Recommendations The Status of Renewable Hydrogen and Energy Station Technologies and Policy Recommendations This presentation by Tim Lipman on the status of renewable hydrogen and energy station technologies was prepared for the Public Fuel Cell Alliance and the Clean Energy States Alliance. PDF icon education_presentation_lipman.pdf More Documents & Publications Hydrogen

  13. Spiro D Alexandratos, Status Discussion | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Spiro D Alexandratos, Status Discussion Chemical Sciences, Geosciences, & Biosciences (CSGB) Division CSGB Home About Research Areas Reports and Activities Science Highlights Principal Investigators' Meetings BES Home Third DOE BES Separations Research Workshop Spiro D Alexandratos, Status Discussion Print Text Size: A A A FeedbackShare Page Third DOE/Basic Energy Sciences Separations Research Workshop Savannah DeSoto Hilton, Savannah, Georgia May 12-14, 1999 Status Discussion Spiro D.

  14. DEER 2007 ACES Status Report Poster: P-23 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ACES Status Report Poster: P-23 DEER 2007 ACES Status Report Poster: P-23 Poster presentation at the 2007 Diesel Engine-Efficiency & Emissions Research Conference (DEER 2007). 13-16 August, 2007, Detroit, Michigan. Sponsored by the U.S. Department of Energy's (DOE) Office of FreedomCAR and Vehicle Technologies (OFCVT). PDF icon deer07_tennant.pdf More Documents & Publications Advanced Collaborative Emissions Study Advanced Collaborative Emissions Study (ACES): Phase 2 Status Report

  15. Status Updates on the Performance and Risk Assessment Community of Practice

    Energy Savers [EERE]

    | Department of Energy Practice Status Updates on the Performance and Risk Assessment Community of Practice Presentation from the 2015 Annual Performance and Risk Assessment (P&RA) Community of Practice (CoP) Technical Exchange Meeting held in Richland, Washington on December 15-16, 2015. PDF icon Status Updates on the Performance and Risk Assessment Community of Practice More Documents & Publications Status Updates on the Performance and Risk Assessment Community of Practice

  16. Status of DOE Research Efforts in Gas Hydrates | Department of Energy

    Energy Savers [EERE]

    Status of DOE Research Efforts in Gas Hydrates Status of DOE Research Efforts in Gas Hydrates July 30, 2009 - 1:38pm Addthis Statement of Dr. Ray Boswell, National Energy Technology Laboratory before the Committee on Natural Resources, Subcommittee on Energy and Mineral Resources, U.S. House of Representatives. Thank you, Mr. Chairman and Members of the Subcommittee. I appreciate this opportunity to provide testimony on the status of the United States Department of Energy's (DOE's) research

  17. FY14 Status Report: CIRFT Testing Results on High Burnup UNF | Department

    Office of Environmental Management (EM)

    of Energy FY14 Status Report: CIRFT Testing Results on High Burnup UNF FY14 Status Report: CIRFT Testing Results on High Burnup UNF This report provides a status of the performance of a systematic study of used nuclear fuel (UNF, also known as "spent nuclear fuel" [SNF]) integrity under simulated transportation environments using the Cyclic Integrated Reversible-Bending Fatigue Tester (CIRFT) hot-cell testing technology developed at Oak Ridge National Laboratory (ORNL) in August

  18. EVMS Training Snippet: 2.4 Contract Funds Status Report (CFSR) Overview and

    Office of Environmental Management (EM)

    Reconciliation with IPMR/CPR | Department of Energy 4 Contract Funds Status Report (CFSR) Overview and Reconciliation with IPMR/CPR EVMS Training Snippet: 2.4 Contract Funds Status Report (CFSR) Overview and Reconciliation with IPMR/CPR This EVMS Training Snippet sponsored by the Office of Project Management (PM) provides an overview of the purpose of the Contract Funds Status Report, and how to review it with the Integrated Program Management Report (IPMR) or Contract Performance Report

  19. BP-16 Transmission Rate Case Workshop

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Discussion Purposes Only. September 8, 2015 Agenda Why are we here? Status: Fundamentals Approaches PrinciplesOpen Discussion Next steps * Workshop Timeline 2...

  20. Gearbox Reliability Collaborative: Gearbox 3 Manufacturing Status; NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Keller, J.

    2015-02-17

    An update on the status of the Gearbox Reliability Collaborative (GRC) improved gearbox is presented, including a brief summary of key instrumentation.

  1. Accelerator spallation reactors for breeding of fissile fuel and transmuting fission products. Status and prospects

    SciTech Connect (OSTI)

    Steinberg, M.

    1981-01-01

    This report constitutes a summary review of the status and prospects of the development of accelerator spallation reactors for breeding fissile fuel and for transmuting fission products.

  2. State-of-the-art Fuel Cell Voltage Durability Status: 2015 Composite Data Products

    SciTech Connect (OSTI)

    Kurtz, Jennfier; Dinh, Huyen; Ainscough, Chris; Saur, Genevieve

    2015-05-01

    This publication includes 14 composite data products (CDPs) produced in 2015 for fuel cell technology status, focusing on state-of-the-art fuel cell voltage durability.

  3. H.A.R. 11-265 - Hazardous Management: Interim Status Standard...

    Open Energy Info (EERE)

    Status Standard for Owners and OperatorsLegal Abstract The Hawaii State Department of Health regulates hazardous waste management through this chapter of the administrative...

  4. The U.S. Nuclear Waste Technical Review Board Status Update

    Office of Environmental Management (EM)

    Technical Review Board Status Update Presented to: ... Fresh Uranium Fuel Fabrication F ilit Nuclear Power Plant ... operating & decommissioning cost * Expand NUWASTE ...

  5. Microsoft PowerPoint - 2012 Hanford Advisory Board Membership Package Status-nwB.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Membership Package Status 2012 2012 Hanford Ad i Advisory Board Board Membership Package Status Status 1 2012 Hanford Advisory Board Membership Package Status 2012 HAB M b hi 2012 HAB Membership Package Overview Submitted to DOE-HQ on January 24 18 primary member nominations 16 i ti b (2 t "i t i - 16 existing members (2 were recent "interim appointments - 2 new nominations 24 alternate member nominations - 18 existing members 6 new nominations - 6 new nominations HQ review underway

  6. Joint Maintenance Status Report of Potomac Electric Power Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension of Order No. 202-05-3 of the District of Columbia Public Service Commission Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced ...

  7. SEP CASE STUDY WEBINAR: MEDIMMUNE

    Broader source: Energy.gov [DOE]

    This Measurement and Verification Case Study webinar is the first in a series of case study webinars to highlight the successes of facilities that have achieved Superior Energy Performance (SEP)...

  8. Status of fossil energy resources: A global perspective

    SciTech Connect (OSTI)

    Balat, M.

    2007-07-01

    This article deals with recently status of global fossil energy sources. Fossil energy sources have been split into three categories: oil,coal, and natural gas. Fossil fuels are highly efficient and cheap. Currently oil is the fastest primary energy source in the world (39% of world energy consumption). Coal will be a major source of energy for the world for the foreseeable future (24% of world energy consumption). In 2030, coal covers 45% of world energy needs. Natural gas is expected to be the fastest growing component of world energy consumption (23% of world energy consumption). Fossil fuel extraction and conversion to usable energy has several environmental impacts. They could be a major contributor to global warming and greenhouse gases and a cause of acid rain; therefore, expensive air pollution controls are required.

  9. DDE-MITR Status Report of Conceptual Design Activities

    SciTech Connect (OSTI)

    N.E. Woolstenhulme; R.B. Nielson; J.D. Wiest; J.W. Nielsen; G.A. Roth; S.D. Snow

    2012-09-01

    The Design Demonstration Experiment for the Massachusetts Institute of Technology Reactor (DDE-MITR) is intended to facilitate Low Enriched Uranium (LEU) conversion of the MITR by demonstrating the performance and fabrication of the LEU fuel element design through an irradiation test in the Advanced Test Reactor center flux trap. At the time this report was prepared the resources for furthering DDE design work were expected to be postponed. As such, the conceptual design effort to date is summarized herein in order to provide the status of key objectives, notable results, and provisions for future design work. These demonstrate that the DDE-MITR design effort is well on the path to producing a suitable irradiation experiment, but also exhibits several challenges for which timely resolution is recommend in order to facilitate success of the irradiation campaign and ultimate conversion of the MITR.

  10. Status of the Boeing Dish Engine Critical Component Project

    SciTech Connect (OSTI)

    Brau, H.W.; Diver, R.B.; Nelving, H.; Stone, K.W.

    1999-01-08

    The Boeing Company's Dish Engine Critical Component (DECC) project started in April of 1998. It is a continuation of a solar energy program started by McDonnell Douglas (now Boeing) and United Stirling of Sweden in the mid 1980s. The overall objectives, schedule, and status of this project are presented in this paper. The hardware test configuration, hardware background, operation, and test plans are also discussed. A summary is given of the test data, which includes the daily power performance, generated energy, working-gas usage, mirror reflectivity, solar insolation, on-sun track time, generating time, and system availability. The system performance based upon the present test data is compared to test data from the 1984/88 McDonnell Douglas/United Stirling AB/Southem California Edison test program. The test data shows that the present power, energy, and mirror performance is comparable to when the hardware was first manufactured 14 years ago.

  11. Underground coal gasification: a brief review of current status

    SciTech Connect (OSTI)

    Shafirovich, E.; Varma, A.

    2009-09-15

    Coal gasification is a promising option for the future use of coal. Similarly to gasification in industrial reactors, underground coal gasification (UCG) produces syngas, which can be used for power generation or for the production of liquid hydrocarbon fuels and other valuable chemical products. As compared with conventional mining and surface gasification, UCG promises lower capital/operating costs and also has other advantages, such as no human labor underground. In addition, UCG has the potential to be linked with carbon capture and sequestration. The increasing demand for energy, depletion of oil and gas resources, and threat of global climate change lead to growing interest in UCG throughout the world. In this article, we review the current status of this technology, focusing on recent developments in various countries.

  12. DDE-NBSR Status Report of Conceptual Design Activities

    SciTech Connect (OSTI)

    N.E. Woolstenhulme; R.B. Nielson; B.P. Durtschi; C.R. Glass; G.A. Roth; D.T. Clark

    2012-09-01

    The Design Demonstration Experiment for the National Bureau of Standard Reactor (DDE-NBSR) is intended to facilitate Low Enriched Uranium (LEU) conversion of the NBSR by demonstrating the performance and fabrication of the LEU fuel element design through an irradiation test in the Advanced Test Reactor center flux trap. At the time this report was prepared the resources for furthering DDE design work were expected to be postponed. As such, the conceptual design effort to date is summarized herein in order to provide the status of key objectives, notable results, and provisions for future design work. These demonstrate that the DDE-NBSR design effort is well on the path to producing a suitable irradiation experiment, but also exhibits several challenges for which timely resolution is recommend in order to facilitate success of the irradiation campaign and ultimate conversion of the NBSR.

  13. Technical status of the Dish/Stirling Joint Venture Program

    SciTech Connect (OSTI)

    Bean, J.R.; Diver, R.B.

    1995-06-01

    Initiated in 1991; the Dish/Stirling Joint Venture Program (DSJVP) is a 5-year, $17.2 million joint venture which is funded by Cummins Power Generation, Inc. (CPG) of Columbus, Indiana and the United States Department of Energy`s (DOE) Solar Thermal and Biomass Power Division. Sandia National Laboratories administers and provides technical management for this contract on the DOE`s behalf. In January, 1995; CPG advanced to Phase 3 of this three-phase contract. The objective of the DSJVP is to develop and commercialize a 7-kW. Dish/Stirling System for remote power markets by 1997. In this paper, the technical status of the major subsystems which comprise the CPG 7-kW{sub e} Dish/Stirling System is presented. These subsystems include the solar concentrator, heat pipe receiver, engine/alternator, power conditioning, and automatic controls.

  14. Status of research toward the ITER disruption mitigation system

    SciTech Connect (OSTI)

    Hollmann, E. M.; Izzo, V. A.; Aleynikov, P. B.; Lehnen, M.; Snipes, J. A.; Flp, T.; Humphreys, D. A.; Lukash, V. E.; Papp, G.; Pautasso, G.; Saint-Laurent, F.

    2015-02-15

    An overview of the present status of research toward the final design of the ITER disruption mitigation system (DMS) is given. The ITER DMS is based on massive injection of impurities, in order to radiate the plasma stored energy and mitigate the potentially damaging effects of disruptions. The design of this system will be extremely challenging due to many physics and engineering constraints such as limitations on port access and the amount and species of injected impurities. Additionally, many physics questions relevant to the design of the ITER disruption mitigation system remain unsolved such as the mechanisms for mixing and assimilation of injected impurities during the rapid shutdown and the mechanisms for the subsequent formation and dissipation of runaway electron current.

  15. The MAJORANA DEMONSTRATOR for 0???: Current status and future plans

    SciTech Connect (OSTI)

    Green, M. P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Abgrall, N. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Aguayo, E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Avignone, III, F. T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of South Carolina, Columbia, SC (United States); Barabash, A. S. [Institute for Theoretical and Experimental Physics, Moscow (Russia); Bertrand, F. E. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Boswell, M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Brudanin, V. [Joint Institute for Nuclear Research, Dubna (Russia); Busch, M. [Duke Univ., Durham, NC (United States); Triange Univ. Nuclear Lab., Durham, NC (United States); Byram, D. [Univ. of South Dakota, Vermillion, SD (United States); Caldwell, A. S. [South Dakota School of Mines and Technology, Rapid CIty, SD (United States); Chan, Y. -D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Christofferson, C. D. [South Dakota School of Mines and Technology, Rapid CIty, SD (United States); Combs, D. C. [North Carolina State Univ., Raleigh, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Cuesta, C. [Univ. of Washington, Seattle, WA (United States); Detwiler, J. A. [Univ. of Washington, Seattle, WA (United States); Doe, P. J. [Univ. of Washington, Seattle, WA (United States); Efremenko, Yu. [Univ. of Tennessee, Knoxville, TN (United States); Egorov, V. [Joint Institute for Nuclear Research, Dubna (Russia); Ejiri, H. [Osaka Univ., Osaka (Japan); Elliott, S. R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Fast, J. E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Finnerty, P. [Univ. of North Carolina, Chapel Hill, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Fraenkle, F. M. [Univ. of North Carolina, Chapel Hill, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Galindo-Uribarri, A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Giovanetti, G. K. [Univ. of North Carolina, Chapel Hill, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Goett, J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Gruszko, J. [Univ. of Washington, Seattle, WA (United States); Guiseppe, V. E. [Univ. of South Carolina, Columbia, SC (United States); Gusev, K. [Joint Institute for Nuclear Research, Dubna (Russia); Hallin, A. L. [Univ. of Alberta, Edmonton, AB (Canada); Hazama, R. [Osaka Univ., Osaka (Japan); Hegai, A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); North Carolina State Univ., Raleigh, NC (United States); Henning, R. [Univ. of North Carolina, Chapel Hill, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Hoppe, E. W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Howard, S. [South Dakota School of Mines and Technology, Rapid CIty, SD (United States); Howe, M. A. [Univ. of North Carolina, Chapel Hill, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Keeter, K. J. [Black Hills State Univ., Spearfish, SD (United States); Kidd, M. F. [Tennessee Tech Univ., Cookeville, TN (United States); Kochetov, O. [Joint Institute for Nuclear Research, Dubna (Russia); Konovalov, S. I. [Institute for Theoretical and Experimental Physics, Moscow (Russia); Kouzes, R. T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); LaFerriere, B. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leon, J. [Univ. of Washington, Seattle, WA (United States); Leviner, L. E. [North Carolina State Univ., Raleigh, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); Loach, J. C. [Shanghai Jiao Tong Univ., Shanghai (China); MacMullin, J. [Univ. of North Carolina, Chapel Hill, NC (United States); Triangle Univ. Nuclear Lab., Durham, NC (United States); MacMullin, S. [Univ. of North Carolina, Chapel Hill, NC (United States)

    2015-01-01

    The Majorana Demonstrator will search for neutrinoless-double-beta decay (0???) in 76Ge, while establishing the feasibility of a future tonne-scale germanium-based 0??? experiment, and performing searches for new physics beyond the Standard Model. The experiment, currently under construction at the Sanford Underground Research Facility in Lead, SD, will consist of a pair of modular high-purity germanium detector arrays housed inside of a compact copper, lead, and polyethylene shield. Through a combination of strict materials qualifications and assay, low-background design, and powerful background rejection techniques, the Demonstrator aims to achieve a background rate in the 0??? region of interest (ROI) of no more than 3 counts in the 0???-decay ROI per tonne of target isotope per year (cnts/(ROI-t-y)). The current status of the Demonstrator is discussed, as are plans for its completion.

  16. Development of polymer film solar collectors: a status report

    SciTech Connect (OSTI)

    Wilhelm, W.G.; Andrews, J.W.

    1982-08-01

    Solar energy collector panels using polymer film and laminate technology have been developed which demonstrate low cost and high thermal performance for residential and commercial applications. This device uses common water in the absorber/heat exchanger which is constructed with polymer film adhesively laminated to aluminum foil as the outer surfaces. Stressed polymer films are also used for the outer window and back surface of the panel forming a high strength structural composite. Rigid polymer foam complements the design by contributing insulation and structural definition. This design has resulted in very low weight (3.5 kg/m/sup 2/), potentially very low manufacturing cost (approx. $11/m/sup 2/), and high thermal performance. The development of polymer materials for this technology will be a key to early commercial success. This report summarizes the current status of development and discusses the information gained from system tests are summarized.

  17. Fusion materials high energy-neutron studies. A status report

    SciTech Connect (OSTI)

    Doran, D.G.; Guinan, M.W.

    1980-01-01

    The objectives of this paper are (1) to provide background information on the US Magnetic Fusion Reactor Materials Program, (2) to provide a framework for evaluating nuclear data needs associated with high energy neutron irradiations, and (3) to show the current status of relevant high energy neutron studies. Since the last symposium, the greatest strides in cross section development have been taken in those areas providing FMIT design data, e.g., source description, shielding, and activation. In addition, many dosimetry cross sections have been tentatively extrapolated to 40 MeV and integral testing begun. Extensive total helium measurements have been made in a variety of neutron spectra. Additional calculations are needed to assist in determining energy dependent cross sections.

  18. Status report: A hydrologic framework for the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Solomon, D.K.; Toran, L.E.; Dreier, R.B.; Moore, G.K.; McMaster, W.M.

    1992-05-01

    This first status report on the Hydrologic Studies Task of the Oak Ridge Reservation Hydrology and Geology Study (ORRHAGS) revises earlier concepts of subsurface hydrology and hydrogeochemistry of the ORR. A new classification of hydrogeologic units is given, as well as new interpretations of the gydrogeologic properties and processes that influence contaminant migration. The conceptual hydrologic framework introduced in this report is based primarily on reinterpretations of data acquired during earlier hydrologic investigations of waste areas at and near the three US Department of Energy Oak Ridge (DOE-OR) plant facilities. In addition to describing and interpreting the properties and processes of the groundwater systems as they are presently understood, this report describes surface water-subsurface water relations, influences on contaminant migration,and implications to environmental restoration, environmental monitoring, and waste management.

  19. The status of the Fermilab data storage system

    SciTech Connect (OSTI)

    Bakken, J.; Berman, E.; Huang, Chi-Hao; Moibenko, A.; Petravick, D.; Zalokar, M.; /Fermilab

    2004-12-01

    This document describes the Fermilab Data Storage System Enstore, its design concepts, structure, and current status. Enstore provides storage of the data in robotic tape libraries according to requirements of the experiments. High fault tolerance and availability, as well as multilevel priority based request processing allows experiments to effectively store and access data in the Enstore. Amount of data stored in the system currently approaches 2 PBytes. The Enstore system includes 5 robotic tape libraries, more than 100 PC nodes, and 90 tape drives. The distributed structure and modularity of Enstore allows scaling of the system and adding of more storage equipment as the requirements and needs grow. Users access data in Enstore directly using a special command. They can also use ftp, GridFtp, and SRM interfaces to the dCache caching and buffering system [1], which uses Enstore as its lower layer storage.

  20. Pretreatment of neutralized cladding removal waste sludge: Status Report

    SciTech Connect (OSTI)

    Lumetta, G J; Swanson, J L

    1993-03-01

    This report describes the status of process development for pretreating Hanford neutralized cladding removal waste (NCRW) sludge, of which [approximately] 3.3 [times] 10[sup 6] L is stored in Tanks 103-AW and 105-AW at the Hanford Site. The initial baseline process chosen for pretreating NCRW sludge is to dissolve the sludge in nitric acid and extract the -transuranic (MU) elements from the dissolved sludge solution with octyl(phenyl)-N,N-diisobutylcarbamoyl methyl phosphine oxide (CNWO). This process converts the NCRW sludge into a relatively large volume of low-level waste (LLW) to be disposed of as grout, leaving only a small volume of high-level waste (HLW) requiring vitrification in the Hanford Waste Vitrification Plant (HWVP).

  1. The Safety and Tritium Applied Research (STAR) Facility: Status-2004

    SciTech Connect (OSTI)

    Anderl, R.A.; Longhurst, G.R.; Pawelko, R.J.; Sharpe, J.P.; Schuetz, S.T.; Petti, D.A.

    2005-07-15

    The Safety and Tritium Applied Research (STAR) Facility, a US DOE National User Facility at the Idaho National Engineering and Environmental Laboratory (INEEL), comprises capabilities and infrastructure to support both tritium and non-tritium research activities important to the development of safe and environmentally friendly fusion energy. Research thrusts include (1) interactions of tritium and deuterium with plasma-facing-component (PFC) materials, (2) fusion safety issues [PFC material chemical reactivity and dust/debris generation, activation product mobilization, tritium behavior in fusion systems], and (3) molten salts and fusion liquids for tritium breeder and coolant applications. This paper updates the status of STAR and the capabilities for ongoing research activities, with an emphasis on the development, testing and integration of the infrastructure to support tritium research activities. Key elements of this infrastructure include a tritium storage and assay system, a tritium cleanup system to process glovebox and experiment tritiated effluent gases, and facility tritium monitoring systems.

  2. Status of the Dark Energy Survey Camera (DECam) Project

    SciTech Connect (OSTI)

    Flaugher, Brenna L.; Abbott, Timothy M.C.; Angstadt, Robert; Annis, Jim; Antonik, Michelle, L.; Bailey, Jim; Ballester, Otger.; Bernstein, Joseph P.; Bernstein, Rebbeca; Bonati, Marco; Bremer, Gale; /Fermilab /Cerro-Tololo InterAmerican Obs. /ANL /Texas A-M /Michigan U. /Illinois U., Urbana /Ohio State U. /University Coll. London /LBNL /SLAC /IFAE

    2012-06-29

    The Dark Energy Survey Collaboration has completed construction of the Dark Energy Camera (DECam), a 3 square degree, 570 Megapixel CCD camera which will be mounted on the Blanco 4-meter telescope at CTIO. DECam will be used to perform the 5000 sq. deg. Dark Energy Survey with 30% of the telescope time over a 5 year period. During the remainder of the time, and after the survey, DECam will be available as a community instrument. All components of DECam have been shipped to Chile and post-shipping checkout finished in Jan. 2012. Installation is in progress. A summary of lessons learned and an update of the performance of DECam and the status of the DECam installation and commissioning will be presented.

  3. Assessing Pacific Lamprey Status in the Columbia River Basin.

    SciTech Connect (OSTI)

    Moser, Mary L.; Close, David A.

    2003-06-01

    In the Columbia River drainage, salmonid-based monitoring programs have historically been used to assess status of both adult and juvenile Pacific lamprey. We compared adult lamprey counts at hydropower dams to recent radiotelemetry results and found that the counts underestimated losses between some dams and overestimated passage times through reservoirs. Count data were not correlated with trap captures of adults conducted in the same area and at the same time, likely due to lamprey-specific behaviors that result in inaccurate counts. We recommend maintenance of traditional count protocols, but emphasize the need for continued research to develop an accurate correction factor to apply to these data. Existing salmonid-based sampling for juvenile lamprey is inadequate and we highlight the need for standardized larval lamprey monitoring that provides both abundance and size distributions. Our electrofishing survey for juvenile lamprey indicated that this technique provides critical information on lamprey recruitment and is feasible over large spatial scales.

  4. Aggregating job exit statuses of a plurality of compute nodes executing a parallel application

    DOE Patents [OSTI]

    Aho, Michael E.; Attinella, John E.; Gooding, Thomas M.; Mundy, Michael B.

    2015-07-21

    Aggregating job exit statuses of a plurality of compute nodes executing a parallel application, including: identifying a subset of compute nodes in the parallel computer to execute the parallel application; selecting one compute node in the subset of compute nodes in the parallel computer as a job leader compute node; initiating execution of the parallel application on the subset of compute nodes; receiving an exit status from each compute node in the subset of compute nodes, where the exit status for each compute node includes information describing execution of some portion of the parallel application by the compute node; aggregating each exit status from each compute node in the subset of compute nodes; and sending an aggregated exit status for the subset of compute nodes in the parallel computer.

  5. Explosively separable casing

    DOE Patents [OSTI]

    Jacobson, Albin K. (Albuquerque, NM); Rychnovsky, Raymond E. (Livermore, CA); Visbeck, Cornelius N. (Livermore, CA)

    1985-01-01

    An explosively separable casing including a cylindrical afterbody and a circular cover for one end of the afterbody is disclosed. The afterbody has a cylindrical tongue extending longitudinally from one end which is matingly received in a corresponding groove in the cover. The groove is sized to provide a pocket between the end of the tongue and the remainder of the groove so that an explosive can be located therein. A seal is also provided between the tongue and the groove for sealing the pocket from the atmosphere. A frangible holding device is utilized to hold the cover to the afterbody. When the explosive is ignited, the increase in pressure in the pocket causes the cover to be accelerated away from the afterbody. Preferably, the inner wall of the afterbody is in the same plane as the inner wall of the tongue to provide a maximum space for storage in the afterbody and the side wall of the cover is thicker than the side wall of the afterbody so as to provide a sufficiently strong surrounding portion for the pocket in which the explosion takes place. The detonator for the explosive is also located on the cover and is carried away with the cover during separation. The seal is preferably located at the longitudinal end of the tongue and has a chevron cross section.

  6. Technology Deployment Case Studies | Department of Energy

    Office of Environmental Management (EM)

    Deployment Technology Deployment Case Studies Technology Deployment Case Studies These case studies describe evaluations of energy-efficient technologies being used in federal...

  7. Better Buildings Residential Network Case Study: Partnerships...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Network Case Study: Partnerships Better Buildings Residential Network Case Study: Partnerships Better Buildings Residential Network Case Study: Partnerships, from the U.S. ...

  8. Geothermal Case Study Challenge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Case Study Challenge Geothermal Case Study Challenge Geothermal Case Study Challenge The ... student competition in exploration research to engage students pursuing STEM careers ...

  9. Patrick Case | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Blake Case Larry Case Patrick Case Dorothy Coker Gordon Fee Linda Fellers Louis Freels Marie Guy Nathan Henry Agnes Houser John Rice Irwin Harvey Kite Charlie Manning Alice...

  10. Blake Case | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Blake Case Larry Case Patrick Case Dorothy Coker Gordon Fee Linda Fellers Louis Freels Marie Guy Nathan Henry Agnes Houser John Rice Irwin Harvey Kite Charlie Manning Alice...

  11. Water Efficiency Case Studies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Efficiency Case Studies Water Efficiency Case Studies These case studies offer examples of water efficiency projects implemented by federal agencies. They are organized by ...

  12. BBRN Factsheet: Case Study: Community Engagement | Department...

    Office of Environmental Management (EM)

    BBRN Factsheet: Case Study: Community Engagement BBRN Factsheet: Case Study: Community Engagement Case Study: Community Engagement, on the Community Home Energy Retrofit Project...

  13. Non-ferromagnetic overburden casing

    DOE Patents [OSTI]

    Vinegar, Harold J. (Bellaire, TX); Harris, Christopher Kelvin (Houston, TX); Mason, Stanley Leroy (Allen, TX)

    2010-09-14

    Systems, methods, and heaters for treating a subsurface formation are described herein. At least one system for electrically insulating an overburden portion of a heater wellbore is described. The system may include a heater wellbore located in a subsurface formation and an electrically insulating casing located in the overburden portion of the heater wellbore. The casing may include at least one non-ferromagnetic material such that ferromagnetic effects are inhibited in the casing.

  14. FAQ for Case Study Authors

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews » FAQ for Case Study Authors Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems:

  15. FAQ for Case Study Authors

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews FAQ for Case Study Authors Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background...

  16. The Asia Pacific LNG trade: Status and technology development

    SciTech Connect (OSTI)

    Hovdestad, W.R.

    1995-10-01

    The Asia Pacific Region is experiencing a period of sustained economic expansion. Economic growth has led to an increasing demand for energy that has spurred a rapid expansion of baseload liquefied natural gas (LNG) facilities in this region. This is illustrated by the fact that seven of the ten baseload facilities in existence provide LNG for markets in the Asia Pacific region. With the three exceptions having been initially commissioned in 1972 and earlier, it is fair to observed that most advances in LNG technology have been developed and applied for this market. The paper presents the current status and identified future trends for the Asia Pacific LNG trade. Technology development in terms of application to onstream production, processing and transportation facilities, including LNG tankers, is presented. The potential of future advances to applied technology and operational practices to improve the cost-effectiveness of new and existing facilities is discussed. Current design data and methods as actually used are examined in terms of identifying where fundamental research and basic physical data are insufficient for optimization purposes. These findings are then summarized and presented in terms of the likely evolution of future and existing LNG projects in the Asia Pacific region.

  17. Plutonium metal exchange program : current status and statistical analysis

    SciTech Connect (OSTI)

    Tandon, L.; Eglin, J. L.; Michalak, S. E.; Picard, R. R.; Temer, D. J.

    2004-01-01

    The Rocky Flats Plutonium (Pu) Metal Sample Exchange program was conducted to insure the quality and intercomparability of measurements such as Pu assay, Pu isotopics, and impurity analyses. The Rocky Flats program was discontinued in 1989 after more than 30 years. In 2001, Los Alamos National Laboratory (LANL) reestablished the Pu Metal Exchange program. In addition to the Atomic Weapons Establishment (AWE) at Aldermaston, six Department of Energy (DOE) facilities Argonne East, Argonne West, Livermore, Los Alamos, New Brunswick Laboratory, and Savannah River are currently participating in the program. Plutonium metal samples are prepared and distributed to the sites for destructive measurements to determine elemental concentration, isotopic abundance, and both metallic and nonmetallic impurity levels. The program provides independent verification of analytical measurement capabilies for each participating facility and allows problems in analytical methods to be identified. The current status of the program will be discussed with emphasis on the unique statistical analysis and modeling of the data developed for the program. The discussion includes the definition of the consensus values for each analyte (in the presence and absence of anomalous values and/or censored values), and interesting features of the data and the results.

  18. Compliance status report for the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Not Available

    1994-03-31

    The US Department of Energy (DOE) is responsible for the disposition of transuranic (TRU) waste generated through national defense-related activities. Approximately 53,700 m{sup 2} of these wastes have been generated and are currently stored at government defense installations across the country. The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been sited and constructed to meet the criteria established by the scientific and regulatory community for the safe, long-term disposal of TRU and TRU-mixed wastes. This Compliance Status Report (CSR) provides an assessment of the progress of the WIPP Program toward compliance with long-term disposal regulations, set forth in Title 40 CFR 191 (EPA, 1993a), Subparts B and C, and Title 40 CFR {section}268.6 (EPA, 1993b), in order to focus on-going and future experimental and engineering activities. The CSR attempts to identify issues associated with the performance of the WIPP as a long-term repository and to focus on the resolution of these issues. This report will serve as a tool to focus project resources on the areas necessary to ensure complete, accurate, and timely submittal of the compliance application. This document is not intended to constitute a statement of compliance or a demonstration of compliance.

  19. The HD 5980 multiple system: Masses and evolutionary status

    SciTech Connect (OSTI)

    Koenigsberger, Gloria [Instituto de Ciencias Fsicas, Universidad Nacional Autnoma de Mxico, Ave. Universidad S/N, Cuernavaca, Morelos 62210 (Mexico); Morrell, Nidia [Las Campanas Observatory, The Carnegie Observatories, Colina El Pino s/n, Casillas 601, La Serena (Chile); Hillier, D. John [Department of Physics and Astronomy, and Pittsburgh Particle Physics, Astrophysics and Cosmology Center (PITT PACC), 3941 O'Hara Street, University of Pittsburgh, Pittsburgh, PA 15260 (United States); Gamen, Roberto [Facultad de Ciencias Astronmicas y Geofsicas, Universidad Nacional de La Plata, and Instituto de Astrofsica de La Plata (CCT La Plata-CONICET), Paseo del Bosque S/N, B1900FWA La Plata (Argentina); Schneider, Fabian R. N.; Gonzlez-Jimnez, Nicols; Langer, Norbert [Argelander-Institut fr Astronomie, Auf dem Hgel 71, D-53121 Bonn (Germany); Barb, Rodolfo, E-mail: gloria@astro.unam.mx, E-mail: nmorrell@lco.edu, E-mail: hillier@pitt.edu, E-mail: rgamen@fcaglp.unlp.edu.ar, E-mail: fschneid@astro.uni-bonn.de, E-mail: ngonzalez@astro.uni-bonn.de, E-mail: nlanger@astro.uni-bonn.de, E-mail: rbarba@dfuls.cl [Departamento de Fsica, Av. Juan Cisternas 1200 Norte, Universidad de la Serena, La Serena (Chile)

    2014-10-01

    New spectroscopic observations of the LBV/WR multiple system HD 5980 in the Small Magellanic Cloud are used to address the question of the masses and evolutionary status of the two very luminous stars in the 19.3 day eclipsing binary system. Two distinct components of the N V 4944 line are detected in emission and their radial velocity variations are used to derive masses of 61 and 66 M {sub ?}, under the assumption that binary interaction effects on this atomic transition are negligible. We propose that this binary system is the product of quasi-chemically homogeneous evolution with little or no mass transfer. Thus, both of these binary stars may be candidates for gamma-ray burst progenitors or even pair instability supernovae. Analysis of the photospheric absorption lines belonging to the third-light object in the system confirm that it consists of an O-type star in a 96.56 day eccentric orbit (e = 0.82) around an unseen companion. The 5:1 period ratio and high eccentricities of the two binaries suggest that they may constitute a hierarchical quadruple system.

  20. Progress and present status of ITER cryoline system

    SciTech Connect (OSTI)

    Badgujar, S.; Bonneton, M.; Chalifour, M.; Forgeas, A.; Serio, L. [ITER Organization, Route de Vinon sur Verdon, 13115 St. Paul lez Durance (France); Sarkar, B.; Shah, N. [ITER-India, Institute for Plasma Research, Bhat, Gandhinagar 382428 (India)

    2014-01-29

    The cryoline system at ITER forms a very complex network localized inside the Tokamak building, on a dedicated plant bridge and in cryoplant areas. The cooling power produced in the cryoplant is distributed via these lines with a total length of about 3.7 km and interconnecting all the cold boxes of the cryogenic system as well as the cold boxes of various clients (magnets, cryopumps and thermal shield). Distinct layouts and polygonal geometry, nuclear safety and confinement requirements, difficult installation and in-service inspection/repair demand very high reliability and availability for the cryolines. The finalization of the building-embedded plates for supporting the lines, before the detailed design, has made this project technologically more challenging. The conceptual design phase has been completed and procurement arrangements have been signed with India, responsible for providing the system of cryolines and warm lines to ITER, as in kind contribution. The prototype test for the design and performance validation has been planned on a representative cryoline section. After describing the basic features and general layout of the ITER cryolines, the paper presents key design requirements, conceptual design approach, progress and status of the cryolines project as well as challenges to build such a complex cryoline system.

  1. Current status and future plan of uranium enrichment technology

    SciTech Connect (OSTI)

    Yonekawa, S.; Yamamoto, F.; Yato, Y.; Kishimoto, Y.

    1994-12-31

    The Power Reactor and Nuclear Fuel Development Corporation (PNC) has been conducting extensive research and development (R&D) on the centrifuge process for more than a quarter of a century. This development program, designated as a national project in 1972, has resulted in the construction and operation of a pilot plant with a capacity of 50 t separative work unit (SWU) per year as well as a demonstration plant with a capacity of 200 t SWU/yr. Under the basic agreement of cooperation concluded in 1985, the technology developed in this program has been transferred to Japan Nuclear Fuel Limited (JNFL), which is now constructing and operating the commercial plant with a capacity of 1500 t SWU/yr at Rokkasho, Aomori. This paper describes the operational experiences of the demonstration plant, the status of a new material centrifuge, which will be introduced at a later stage of construction of the commercial plant, the development of an advanced centrifuge as a next-generation machine, and the research of a superadvanced centrifuge.

  2. US/UK Loan Account Project Status PMOD477

    SciTech Connect (OSTI)

    Stevens, Patrice A.

    2012-07-12

    The viewgraphs describe the status of PMOD477 for LANL. The meeting will occur at DOE-HQ with NA-11 and Military Applications personnel in attendance. Serves to repatriate material with a balance to zero by December 2012. Phase 1 -- Establish formality of operations for War Reserve (WR): Complete surrogate taskings to A90 through a Materials Channel and perform US/UK lessons learned; Complete the US/UK agreed Quality Acceptance Plan, Materials Plan, Shipping procedure, and establish the formal UK/US point of contacts. Phase 2 -- Metal Manufacture (WR): Process material and store material as electrorefined metal (ER) rings, with initial assay and isotopic analysis, prior to manufacturing. Material is cast into accepted configuration and appropriate acceptance document for each aliquot will be generated. Phase 3 -- Intermediate Material Manufacture, Packaging and Shipping (WR): Continue processing of the material in accepted configuration with appropriate acceptance documentation for each aliquot. Provide an initial tasking of the material owed to UK including appropriate quality acceptance documentation. Phase 4 -- Complete Tasking (WR). Phase 5 -- Residue Processing (Non-WR): Complete processing of residue material and waste into accepted configuration with appropriate acceptance document for disposal.

  3. Front-end electronics and trigger systems - status and challenges

    SciTech Connect (OSTI)

    Spieler, Helmuth G; Spieler, Helmuth G

    2007-08-21

    The past quarter century has brought about a revolution in front-end electronics for large-scale detector systems. Custom integrated circuits specifically tailored to the requirements of large detector systems have provided unprecedented performance and enabled systems that once were deemed impossible. The evolution of integrated circuit readouts in strip detectors is summarized, the present status described, and challenges posed by the sLHC and ILC are discussed. Performance requirements increase, but key considerations remain as in the past: power dissipation, material, and services. Smaller CMOS feature sizes will not provide the required electronic noise at lower power, but will improve digital power efficiency. Significant improvements appear to be practical in more efficient power distribution. Enhanced digital electronics have provided powerful trigger processors that greatly improve the trigger efficiency. In data readout systems they also improve data throughput, while reducing power requirements. Concurrently with new developments in high energy physics, detector systems for cosmology and astrophysics have made great strides. As an example, a large-scale readout for superconducting bolometer arrays is described.

  4. Photovoltaic manufacturing: Present status, future prospects, and research needs

    SciTech Connect (OSTI)

    Wolden, C.A.; Fthenakis, V.; Kurtin, J.; Baxter, J.; Repins, I.; Shasheen, S.; Torvik, J.; Rocket, A.; Aydil, E.

    2011-03-29

    In May 2010 the United States National Science Foundation sponsored a two-day workshop to review the state-of-the-art and research challenges in photovoltaic (PV) manufacturing. This article summarizes the major conclusions and outcomes from this workshop, which was focused on identifying the science that needs to be done to help accelerate PV manufacturing. A significant portion of the article focuses on assessing the current status of and future opportunities in the major PV manufacturing technologies. These are solar cells based on crystalline silicon (c-Si), thin films of cadmium telluride (CdTe), thin films of copper indium gallium diselenide, and thin films of hydrogenated amorphous and nanocrystalline silicon. Current trends indicate that the cost per watt of c-Si and CdTe solar cells are being reduced to levels beyond the constraints commonly associated with these technologies. With a focus on TW/yr production capacity, the issue of material availability is discussed along with the emerging technologies of dye-sensitized solar cells and organic photovoltaics that are potentially less constrained by elemental abundance. Lastly, recommendations are made for research investment, with an emphasis on those areas that are expected to have cross-cutting impact.

  5. Status of experiments leading to a small recirculator

    SciTech Connect (OSTI)

    Sangster, C.T.; Barnard, J.J.; Cianciolo, T.V.

    1998-01-16

    A heavy ion linear induction accelerator is considered to be the leading driver candidate for an Inertial Fusion Energy reactor. To deliver a space-charge-dominated beam at the appropriate energy (several GeV), such an accelerator would be several kilometers in length. Since total length has a strong influence on accelerator cost, we are considering the potential advantages and practical implementation of a recirculating induction accelerator. To address the critical scientific and technical challenges of a recirculating space-charge-dominated heavy ion beam, we have begun to develop the elements of a scaled ``small recirculator``. An operating recirculator must demonstrate full beam control including multi-lap operation, beam insertion/extraction, acceleration and pulse compression. At present, experiments have been conducted using a 2mA, 80keV K{sup +} beam transported through a 45{degree} bend; experiments on a 90{degree} bend with five induction modulators will begin soon. This paper briefly summarizes the recirculator specifications and operational features and reports the latest experimental data as well as the developmental status of beam diagnostics.

  6. DDE-MURR Status Report of Conceptual Design Activities

    SciTech Connect (OSTI)

    N.E. Woolstenhulme; R.B. Nielson; M.H. Sprenger; G.K. Housley

    2013-09-01

    The Design Demonstration Experiment for the University of Missouri Research Reactor (DDE-MURR) is intended to facilitate Low Enriched Uranium (LEU) conversion of the MURR by demonstrating the performance and fabrication of the LEU fuel element design through an irradiation test in a 200mm channel at the Belgium Reactor 2 (BR2). Revision 0 of this report was prepared at the end of government fiscal year 2012 when most of the resources for furthering DDE design work were expected to be postponed. Hence, the conceptual design efforts were summarized to provide the status of key objectives, notable results, and provisions for future design work. Revision 1 of this report was prepared at the end of fiscal year 2013 in order to include results from a neutronic study performed by BR2, to incorporate further details that had been achieved in the engineering sketches of the irradiation devices, and to provide an update of the DDE-MURR campaign in relation to program objectives and opportunities for its eventual irradiation. These updates were purposed to bring the DDE-MURR conceptual design to level of maturity similar to that of the other two DDE efforts (DDE-MITR and DDE-NBSR). This report demonstrates that the DDE-MURR design effort is well on the path to producing a suitable irradiation experiment, but also puts forth several recommendations in order to facilitate success of the irradiation campaign.

  7. Environmental Management at the Nevada Test Site Year 2001 Current Status

    SciTech Connect (OSTI)

    Becker, B. D.; Gertz, C. P.; Clayton, W. A.; Carilli, J. T.; DiSanza, E. F.; Wycoff, R. C.; Crowe, B. M.

    2002-02-26

    The performance objectives of the U. S. Department of Energy's National Nuclear Security Administration Nevada Operations Office Low-level Radioactive Waste (LLW) disposal facilities located at the Nevada Test Site transcend those of any other radioactive waste disposal site in the United States. Situated at the southern end of the Great Basin, 244 meters (800 feet) above the water table, the Area 5 Radioactive Waste Management Site (RWMS) has utilized a combination of engineered shallow land disposal cells and deep augured shafts to dispose a variety of waste streams. These include high volume low-activity waste, classified material, and high-specific-activity special case waste. Fifteen miles north of Area 5 is the Area 3 RWMS. Here bulk LLW disposal takes place in subsidence craters formed from underground testing of nuclear weapons. Earliest records indicate that documented LLW disposal activities have occurred at the Area 5 and Area 3 RWMSs since 1961 and 1968, respectively. However, these activities have only been managed under a formal program since 1978. This paper describes the technical attributes of the facilities, present and future capacities and capabilities, and provides a description of the process from waste approval to final disposition. The paper also summarizes the current status of the waste disposal operations. Additionally, the Nevada Operations Office Environmental Restoration Division is responsible for identifying the nature and extent of contamination; determining its potential risk to the public and the environment; and performing the necessary corrective actions in compliance with guidelines and requirements. This paper summarizes just a few of the successes of the Nevada Operations Office projects.

  8. Elizabeth Case | Department of Energy

    Office of Environmental Management (EM)

    Case About Us Elizabeth Case - Guest Blogger, Cycle for Science Most Recent Rain or Shine: We Cycle for Science July 2 Mountains, and Teachers, and a Bear, Oh My! June 2 Sol-Cycle: Biking Across America for Science Education May 1

  9. Retrospective dosimetry using EPR and TL techniques: a status report

    SciTech Connect (OSTI)

    Haskell, E.H.

    1996-12-31

    Methods of retrospective dosimetry, including luminescence and electron paramagnetic resonance spectroscopy (EPR), rely on measurement of accident dose absorbed by naturally occurring materials - ceramics in the case of both thermoluminescence (TL) and optically stimulated luminescence (OSL) and organic materials and bio- minerals in the case of EPR. Each of these methods relies on measurement of radiation defects resulting from accidental exposure. Since defects also result from natural sources of radiation over the lifetime of a sample, analysis is usually restricted to materials for which the natural dose may be determined and subtracted from the measured cumulative dose. Luminescence dating techniques rely heavily on an accurate assessment of cumulative dose from natural radiation sources, and dating research has provided us with the bulk of our knowledge in this area. Virtually all of the work on natural dose determination can be directly applied to retrospective techniques. With EPR techniques the cumulative dose from diagnostic x- rays is also of importance.

  10. Business Case for Technical Qualification Program Accreditation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Business Case for Technical Qualification Program Accreditation Incentives Business Case for Technical Qualification Program Accreditation Incentives TQP Accreditation standardize ...

  11. The U.S. Nuclear Waste Technical Review Board Status Update | Department of

    Office of Environmental Management (EM)

    Energy The U.S. Nuclear Waste Technical Review Board Status Update The U.S. Nuclear Waste Technical Review Board Status Update PDF icon The U.S. Nuclear Waste Technical Review Board Status Update More Documents & Publications Assessment of Disposal Options for DOE-Managed High-Level Radioactive Waste and Spent Nuclear Fuel Fifth National Report for the Joint Convention on the Safety of Spent Fuel Management and the Safety of Radioactive Waste Management Evaluation of Options for

  12. EPRI conference proceedings: solar and wind power - 1982 status and outlook

    SciTech Connect (OSTI)

    DeMeo, E.A.

    1983-02-01

    Separate abstracts were prepared for 18 papers in this proceedings. Not separately abstracted are speeches and presentations covering: past progress and future directions in solar and wind power research and development, new directions in Federal solar electric programs, Solar Energy Research Institute status and outlook, ARCO Solar Industries' involvement in the production of potential solar electric technologies, wind power status and outlook, utility requirements, roles and rewards, and a panel discussion on solar and wind power status and outlook as viewed from industrial, utility, financial, and government perspectives. (LEW)

  13. OPS 9.8 Control of Equipment and System Status 8/24/98 | Department of

    Energy Savers [EERE]

    Energy 8 Control of Equipment and System Status 8/24/98 OPS 9.8 Control of Equipment and System Status 8/24/98 The objective of this surveillance is to verify that the contractor has established and implemented an effective program to control equipment and system status. The surveillance activities provide a basis for verifying the effectiveness of the contractor's program as well as compliance with DOE requirements. Microsoft Office document icon OPS9-08.doc More Documents &

  14. Status and Trends in the U.S. Voluntary Green Power Market | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Status and Trends in the U.S. Voluntary Green Power Market Status and Trends in the U.S. Voluntary Green Power Market This report documents the status and trends of U.S. "compliance" markets-renewable energy certificate (REC) markets used to meet state renewable portfolio standard (RPS) requirements-and "voluntary" markets-those in which consumers and institutions purchase renewable energy to match their electricity needs on a voluntary basis.

  15. Analysis of Restricted Natural Gas Supply Cases

    Reports and Publications (EIA)

    2004-01-01

    The four cases examined in this study have progressively greater impacts on overall natural gas consumption, prices, and supply. Compared to the Annual Energy Outlook 2004 reference case, the no Alaska pipeline case has the least impact; the low liquefied natural gas case has more impact; the low unconventional gas recovery case has even more impact; and the combined case has the most impact.

  16. Congeneration and utilities: Status and prospects: Final report

    SciTech Connect (OSTI)

    Limaye, D.R.; Jacobs, L.; McDonald, C.

    1988-11-01

    The cogeneration industry has grown and changed considerably since the passage of the Public Utility Regulatory Policies Act (PURPA) in 1978. It has moved from infancy to a major industry that must be addressed in electric utility resource planning. This report examines the utility perspective on cogeneration. The report begins with a brief outline of the history of the US cogeneration industry, including an in-depth look at recent developments. An assessment of the industry as it currently stands is then presented. This assessment includes a look at who is cogenerating now and who is likely to be cogenerating in the future. It also includes an analysis of the key market sensitivities and how they affect the individuals who must make the decisions to cogenerate. These discussions provide a framework for the central issue addressed in the next section: the effect of cogeneration on the electric utilities. After the alternative responses to cogeneration are outlined, the report details the impacts of cogeneration on utility planning and policy. Special utility concerns relative to cogeneration are raised including potential ratemaking approaches, the issue of cogeneration reliability and approaches to planning for it, and the costs and benefits of cogeneration to non-participant ratepayers. Next the planning and economic benefits which can accrue from utility ownership of and participation in cogeneration projects are discussed in the context of cogeneration as an electric utility opportunity. The final sections of the report define and classify various types of cogeneration technologies and outline the current status of EPRI's cogeneration research. 21 figs., 22 tabs.

  17. Tampa Electric Company Polk Power Station IGCC project: Project status

    SciTech Connect (OSTI)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D.

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  18. Wankel rotary engine development status and research needs

    SciTech Connect (OSTI)

    Martin, M.K.

    1982-11-01

    This report summarizes the status of Wankel rotary engine technology, particularly as applicable to highway vehicles. The Wankel engine was invented over 25 years ago, and has undergone continual evolutionary design refinement. The engine's perceived advantages of less weight, volume, and complexity than reciprocating engines sparked keen interest, and Wankel-powered automobiles have now been in production for almost 20 years. However, in the early 1970s interest in the Wankel engine greatly subsided because of two problems with the engine at that time: poor fuel economy and high hydrocarbon emissions. The bulk of current Wankel engine development work applicable to highway vehicles is being conducted by Toyo Kogyo (TK) and Curtiss-Wright (C-W). TK has manufactured over 1.2 million rotary engines to date, and markets them in the Mazda Luce and Cosmo in Japan and the Mazda RX-7 worldwide. State-of-the-art production rotary-powered vehicles from TK now exhibit fuel economy which appears to be competitive with many equal-performance, reciprocating-engine vehicles. C-W is focusing its efforts on direct-injection, stratified-charge designs for military and aircraft applications. The company is developing a 750-hp dual-rotor engine for the US Marine Corps, and has completed a design study for a 320-hp general aviation engine. Based on typical reciprocating engines of 1975 to 1977 vintage, and with final drive ratios adjusted to give roughly equal vehicle performance, calculated Environmental Protection Agency (EPA) city fuel economy with the C-W rotary averages 25% higher than with the reciprocating engine. The highway gain is 13%. Use of diesel fuel or a middle distillate instead of gasoline allows an additional 11% gain to be projected on a per-gallon basis. In addition, further gains of 14 to 38% are projected to result from use of a smaller turbocharged version of the engine.

  19. Temporal Nodal Regression and Regional Control After Primary Radiation Therapy for N2-N3 Head-and-Neck Cancer Stratified by HPV Status

    SciTech Connect (OSTI)

    Huang, Shao Hui; O'Sullivan, Brian; Ringash, Jolie; Hope, Andrew; Gilbert, Ralph; Irish, Jonathan; Perez-Ordonez, Bayardo; Weinreb, Ilan; Waldron, John

    2013-12-01

    Purpose: To compare the temporal lymph node (LN) regression and regional control (RC) after primary chemoradiation therapy/radiation therapy in human papillomavirus-related [HPV(+)] versus human papillomavirus-unrelated [HPV(?)] head-and-neck cancer (HNC). Methods and Materials: All cases of N2-N3 HNC treated with radiation therapy/chemoradiation therapy between 2003 and 2009 were reviewed. Human papillomavirus status was ascertained by p16 staining on all available oropharyngeal cancers. Larynx/hypopharynx cancers were considered HPV(?). Initial radiologic complete nodal response (CR) (?1.0 cm 8-12 weeks after treatment), ultimate LN resolution, and RC were compared between HPV(+) and HPV(?) HNC. Multivariate analysis identified outcome predictors. Results: A total of 257 HPV(+) and 236 HPV(?) HNCs were identified. The initial LN size was larger (mean, 2.9 cm vs 2.5 cm; P<.01) with a higher proportion of cystic LNs (38% vs 6%, P<.01) in HPV(+) versus HPV(?) HNC. CR was achieved is 125 HPV(+) HNCs (49%) and 129 HPV(?) HNCs (55%) (P=.18). The mean post treatment largest LN was 36% of the original size in the HPV(+) group and 41% in the HPV(?) group (P<.01). The actuarial LN resolution was similar in the HPV(+) and HPV(?) groups at 12 weeks (42% and 43%, respectively), but it was higher in the HPV(+) group than in the HPV(?) group at 36 weeks (90% vs 77%, P<.01). The median follow-up period was 3.6 years. The 3-year RC rate was higher in the HPV(?) CR cases versus non-CR cases (92% vs 63%, P<.01) but was not different in the HPV(+) CR cases versus non-CR cases (98% vs 92%, P=.14). On multivariate analysis, HPV(+) status predicted ultimate LN resolution (odds ratio, 1.4 [95% confidence interval, 1.1-1.7]; P<.01) and RC (hazard ratio, 0.3 [95% confidence interval 0.2-0.6]; P<.01). Conclusions: HPV(+) LNs involute more quickly than HPV(?) LNs but undergo a more prolonged process to eventual CR beyond the time of initial assessment at 8 to 12 weeks after treatment. Post radiation neck dissection is advisable for all non-CR HPV(?)/non-CR N3 HPV(+) cases, but it may be avoided for selected non-CR N2 HPV(+) cases with a significant LN involution if they can undergo continued imaging surveillance. The role of positron emission tomography for response assessment should be investigated.

  20. Reproductive Status at First Diagnosis Influences Risk of Radiation-Induced Second Primary Contralateral Breast Cancer in the WECARE Study

    SciTech Connect (OSTI)

    Brooks, Jennifer D.; Boice, John D.; Stovall, Marilyn; Reiner, Anne S.; Bernstein, Leslie; John, Esther M.; Lynch, Charles F.; Mellemkjaer, Lene; Knight, Julia A.; Thomas, Duncan C.; Haile, Robert W.; Smith, Susan A.; Capanu, Marinela; Bernstein, Jonine L.; Shore, Roy E.; Radiation Effects Research Foundation, Hiroshima

    2012-11-15

    Purpose: Our study examined whether reproductive and hormonal factors before, at the time of, or after radiation treatment for a first primary breast cancer modify the risk of radiation-induced second primary breast cancer. Methods and Materials: The Women's Environmental, Cancer and Radiation Epidemiology (WECARE) Study is a multicenter, population-based study of 708 women (cases) with asynchronous contralateral breast cancer (CBC) and 1399 women (controls) with unilateral breast cancer. Radiotherapy (RT) records, coupled with anthropomorphic phantom simulations, were used to estimate quadrant-specific radiation dose to the contralateral breast for each patient. Rate ratios (RR) and 95% confidence intervals (CI) were computed to assess the relationship between reproductive factors and risk of CBC. Results: Women who were nulliparous at diagnosis and exposed to {>=}1 Gy to the contralateral breast had a greater risk for CBC than did matched unexposed nulliparous women (RR = 2.2; 95% CI, 1.2-4.0). No increased risk was seen in RT-exposed parous women (RR = 1.1; 95% CI, 0.8-1.4). Women treated with RT who later became pregnant (8 cases and 9 controls) had a greater risk for CBC (RR = 6.0; 95% CI, 1.3-28.4) than unexposed women (4 cases and 7 controls) who also became pregnant. The association of radiation with risk of CBC did not vary by number of pregnancies, history of breastfeeding, or menopausal status at the time of first breast cancer diagnosis. Conclusion: Nulliparous women treated with RT were at an increased risk for CBC. Although based on small numbers, women who become pregnant after first diagnosis also seem to be at an increased risk for radiation-induced CBC.

  1. Low-level radioactive waste management at the Nevada Test Site -- Year 2000 current status

    SciTech Connect (OSTI)

    Becker, B.D.; Clayton, W.A.; Gertz, C.P.; Crowe, B.M.

    2000-02-01

    This paper describes the technical attributes of the facilities, present and future capacities and capabilities, and provides a description of the process from waste approval to final disposition. This paper also summarizes the current status of the waste disposal operations.

  2. Status of U.S. FCEV and Infrastructure Learning Demonstration Project (Presentation)

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

    2011-03-01

    Presented at the Japan Hydrogen and Fuel Cell Demonstration Project (JHFC), 1 March 2011, Tokyo, Japan. This presentation summarizes the status of U.S. fuel cell electric vehicles and infrastructure learning demonstration project.

  3. Status of ParaDyn: DYNA3D for parallel computing

    SciTech Connect (OSTI)

    Goudreau, G.L.; Hoover, C.G.; DeGrout, A.J.; Raboin, P.J.

    1996-04-17

    The evolution of DYNA3D from a vector supercomputer code into a parallel code is reviewed. Current status and target applications, especially those of interest to the Department of Defense.

  4. State-of-the-Art Fuel Cell Voltage Durability Status: Spring 2013 Composite Data Products

    SciTech Connect (OSTI)

    Kurtz, J.; Sprik, S.; Saur, G.; Peters, M.; Post, M.; Ainscough, C.

    2013-05-01

    This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes composite data products (CDPs) produced in 2013 for state-of-the-art fuel cell voltage durability status.

  5. Status of Wave and Tidal Power Technologies for the United States

    SciTech Connect (OSTI)

    Musial, W.

    2008-08-01

    This paper presents the status of marine applications for renewable energy as of 2008 from a U.S. perspective. Technologies examined include wave, tidal, and ocean current energy extraction devices.

  6. Waste status and transaction record summary for the northwest quadrant of the Hanford 200 Area

    SciTech Connect (OSTI)

    Agnew, S.F.; Corbin, R.A.; Duran, T.B.; Jurgensen, K.A.; Ortiz, T.P.; Young, B.L.

    1995-09-01

    This supporting document contains a database of waste transactions and waste status reports for all the waste tanks in the northwest quadrant of the 200 West Area of the Hanford Site.

  7. MiniBooNE Results / MicroBooNE Status! Eric Church, Yale University

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at this talk?) 3 Outline MiniBooNE past results future MicroBooNE physics motivation R&D motivation status: (running is imminent) 4 The Booster...

  8. Statement by NNSA Administrator D'Agostino on the Current Status...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NNSA Administrator D'Agostino on the Current Status and Future Direction for U.S. Nuclear Weapons Policy and Posture Before The Subcommittee on Strategic Forces House Armed ...

  9. The Status of NRC Decommissioning Guidance on Intentional Soil Mixing

    SciTech Connect (OSTI)

    Watson, B.A.

    2007-07-01

    In 1997, the U.S. Nuclear Regulatory Commission (NRC) published the License Termination Rule (LTR) as Subpart E of 10 CFR Part 20, which established the license termination criteria for unrestricted use and the controls for restricted use. By 2003, the NRC staff's experience with the LTR revealed some important implementation issues impacting the decommissioning of sites, and these were addressed to the Commission (SECY-03-0069). In 2004, the staff provided the Commission with its analysis of a ninth issue, intentional soil mixing (SECY-04-0035). The Commission approved the staff's recommendations, with comments. In the draft revision of Supplement 1 to NUREG-1757, 'Consolidated Decommissioning Guidance', the staff endorsed the current practice of allowing intentional soil mixing to meet the waste acceptance criteria of offsite disposal facilities and the limited use of this practice to demonstrate compliance with the LTR criteria. The staff recommended including a provision that the staff would consider intentional mixing on a case-by-case basis, provided that the resulting contaminated area footprint is not increased and clean soil from outside the footprint is not mixed with contaminated soil to lower the concentrations. In addition, the staff would consider only those rare cases in which the mixing of clean soil is the only viable option for achieving the dose levels of the LTR. In 2005, the staff issued draft Supplement 1 to NUREG-1757 for public comment. The staff evaluated the public comments, including those from a number of States, and revised the guidance. The staff subsequently summarized the public comments on the draft guidance for the Commission (SECY-06-0143) in early 2006. This paper will discuss the public comments related to intentional mixing, the Commission's comments in its staff requirements memorandum, and the revision to the guidance in NUREG-1757 incorporating the current NRC decommissioning policy for intentional soil mixing. (authors)

  10. Lead Slowing-Down Spectrometry for Spent Fuel Assay: FY12 Status Report

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect Lead Slowing-Down Spectrometry for Spent Fuel Assay: FY12 Status Report Citation Details In-Document Search Title: Lead Slowing-Down Spectrometry for Spent Fuel Assay: FY12 Status Report Executive Summary The Office of Nuclear Energy, Fuel Cycle R&D, Material Protection and Control Technology (MPACT) Campaign is supporting a multi-institutional collaboration to study the feasibility of using Lead Slowing Down Spectroscopy (LSDS) to conduct direct,

  11. Integration of MEA Components-Status and Technology Gaps: A Stakeholder's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Perspective | Department of Energy Integration of MEA Components-Status and Technology Gaps: A Stakeholder's Perspective Integration of MEA Components-Status and Technology Gaps: A Stakeholder's Perspective Presentation from U.S. DOE Fuel Cell Pre-Solicitation Workshop March 16-17, 2010 Denver, CO PDF icon fuelcell_pre-solicitation_wkshop_mar10_debe.pdf More Documents & Publications DOE 2010 Fuel Cell Pre-Solicitation Workshop Agenda DOE Fuel Cell Pre-Solicitation Workshop - Breakout

  12. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM

    Energy Savers [EERE]

    Interconnection, LLC | Department of Energy Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance Report to advise you of the work completed and findings made during the maintenance outages for

  13. Green Power Marketing in the United States. A Status Report (11th Edition)

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect Green Power Marketing in the United States. A Status Report (11th Edition) Citation Details In-Document Search Title: Green Power Marketing in the United States. A Status Report (11th Edition) This report documents green power marketing activities and trends in the United States. It presents aggregate green power sales data for all voluntary purchase markets across the United States. It also provides summary data on utility green pricing programs offered

  14. Green Power Marketing in the United States. A Status Report (2008 Data)

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect Green Power Marketing in the United States. A Status Report (2008 Data) Citation Details In-Document Search Title: Green Power Marketing in the United States. A Status Report (2008 Data) Voluntary consumer decisions to buy electricity supplied from renewable energy sources represent a powerful market support mechanism for renewable energy development. In the early 1990s, a small number of U.S. utilities began offering 'green power' options to their

  15. DISCLAIMER : UNCONTROLLED WHEN PRINTED - PLEASE CHECK THE STATUS OF THE DOCUMENT IN IDM

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    01 Dec 2015 DISCLAIMER : UNCONTROLLED WHEN PRINTED - PLEASE CHECK THE STATUS OF THE DOCUMENT IN IDM Technical Specifications (In-Cash Procurement) Analysis and integration of the Visible Spectroscopy Reference system (55.E6 VSRS) Technical Specifications IDM UID SDEPMD VERSION CREATED ON / VERSION / STATUS 30 Nov 2015 / 1.0 / Approved EXTERNAL REFERENCE / VERSION ITER_D_SDEPMD Page 1 of 8 Table of Contents 1

  16. Status and future plans for the Mark II detector at SLAC

    SciTech Connect (OSTI)

    Perl, M.L.

    1983-04-01

    In this brief talk, I report on three subjects. First the present status of PEP, where there has been a very large increase in the luminosity in the past five months. Next, the present status of the Mark II detector, whose secondary vertex detector constitutes a very important part of the physics which our collaboration is doing at PEP. Finally, I review the design of the upgraded Mark II Detector which will be used at the Stanford Linear Collider (SLC).

  17. Fuel Cell Buses in U.S. Transit Fleets: Current Status 2009 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 9 Fuel Cell Buses in U.S. Transit Fleets: Current Status 2009 This report documents progress in meeting the technological challenges of fuel cell propulsion for transportation based on current fuel cell transit bus demonstrations and plans for more fuel cell transit buses and hydrogen infrastructure. PDF icon 46490.pdf More Documents & Publications Fuel Cell Buses in U.S. Transit Fleets: Current Status 2008 Fuel Cell Bus Evaluation Results (Presentation)

  18. Fuel Quality and Metering: Current Status and Future Needs | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy and Metering: Current Status and Future Needs Fuel Quality and Metering: Current Status and Future Needs These slides were presented at the Onboard Storage Tank Workshop on April 29, 2010. PDF icon fuelquality_metering_ostw.pdf More Documents & Publications Workshop Notes from ""Compressed Natural Gas and Hydrogen Fuels: Lessons Learned for the Safe Deployment of Vehicles"" Workshop, December 10-11, 2009 BILIWG Meeting: DOE Hydrogen Quality Working Group Update

  19. Green Power Marketing in the United States: A Status Report (11th Edition)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Green Power Marketing in the United States: A Status Report (11th Edition) Green Power Marketing in the United States: A Status Report (11th Edition) This report documents green power marketing activities and trends in the United States, focusing on consumer decisions to purchase electricity supplied from renewable energy sources. Date October 2008 Topic Financing, Incentive & Market Analysis Codes, Standards & Utility Policies Subprogram Soft Costs Author

  20. Status of the MAJORANA DEMONSTRATOR: A Search for Neutrinoless Double-Beta

    Office of Scientific and Technical Information (OSTI)

    Decay (Conference) | SciTech Connect Status of the MAJORANA DEMONSTRATOR: A Search for Neutrinoless Double-Beta Decay Citation Details In-Document Search Title: Status of the MAJORANA DEMONSTRATOR: A Search for Neutrinoless Double-Beta Decay Authors: Efremenko, Yuri [1] ; Rielage, Keith Robert [2] ; Goett, John Jerome III [2] ; Elliott, Steven Ray [2] ; Xu, Wenqin [2] + Show Author Affiliations ORNL Los Alamos National Laboratory Publication Date: 2015-04-06 OSTI Identifier: 1177540 Report