Sample records for lost creek project

  1. Changing Obsidian Sources at the Lost Dune and McCoy Creek Sites, Blitzen Valley, Southeast Oregon

    E-Print Network [OSTI]

    Lyons, William H; Thomas, Scott P; Skinner, Craig E

    2001-01-01T23:59:59.000Z

    Dune (35HA792); MC = McCoy Creek (35HA1263) Component ffl;sample. Provenience of McCoy Creek artifacts from Musil (AT THE LOST DUNE AND MCCOY CREEK SITES OREGON NEVADA Burns

  2. Tassajara Creek restoration project: Continued riparian habitat monitoring

    E-Print Network [OSTI]

    Trinh, Michelle; Percelay, Julie

    2008-01-01T23:59:59.000Z

    Consulting. 2001. Tassajara Creek Restoration Project AnnualMorphology in the Tassajara Creek Restoration Project Area:back: Monitoring the Tassajara Creek Restoration Project. UC

  3. Post Project Appraisal of Cerrito Creek at El Cerrito Plaza

    E-Print Network [OSTI]

    Berndt, Sarah; Smith, Fran

    2005-01-01T23:59:59.000Z

    Project Appraisal of Cerrito Creek at El Cerrito Plaza FINALAppraisal (PPA) of the Cerrito Creek Restoration Project atlighted section of Cerrito Creek (approximately 700 feet in

  4. Continued monitoring of the Tassajara Creek restoration project 2004

    E-Print Network [OSTI]

    Oden, Matt; DeHollan, Aurel

    2004-01-01T23:59:59.000Z

    Morphology in the Tassajara Creek Restoration Project Area:Back: Monitoring the Tassajara Creek Restoration Project. UCBed Elevation Tassajara Creek. UC Berkeley Water Resources

  5. Falls Creek Hydroelectric Project

    SciTech Connect (OSTI)

    Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

    2007-06-12T23:59:59.000Z

    This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

  6. The implementation of the Lower Silver Creek watershed project

    E-Print Network [OSTI]

    Keenan, Christina; McPherson, Mariah

    2003-01-01T23:59:59.000Z

    Measures on Lower Silver Creek Interim Project. San Jose,Valley Water District. May 1978. Lower Silver Creek, LakeCunningham, Thompson Creek Planning Survey consisting of

  7. Post-project appraisal of Martin Canyon Creek restoration

    E-Print Network [OSTI]

    Wagner, Wayne; Roseman, Jesse

    2006-01-01T23:59:59.000Z

    Ltd. 1999. Martin Canyon Creek Stream Restoration Owner’sAppraisal of Martin Canyon Creek Restoration Final ProjectDublin, California, Martin Canyon Creek is a small tributary

  8. Post Project Analysis of a Restored Reach of Redwood Creek

    E-Print Network [OSTI]

    Docto, Mia; Corvillon, Daniela Pena

    2012-01-01T23:59:59.000Z

    Inventory  Report  of  Redwood   Creek   Post ProjectAssessment of Redwood Creek Figures Figure 1. Watershed MapFan Conceptual Model Redwood Creek Stream Crossing Removal

  9. Looking forward, looking back : monitoring the Tassajara Creek Restoration Project

    E-Print Network [OSTI]

    Krofta, Chad; Novotney, Michael

    2003-01-01T23:59:59.000Z

    Station Elev. Tassajara Creek Long Profile Compiled SurveyImprovement Plans for Tassajara Creek Restoration. Downs, P.Morphology in the Tassajara Creek Restoration Project Area:

  10. Toms Creek IGCC Demonstration Project

    SciTech Connect (OSTI)

    Virr, M.J.

    1992-01-01T23:59:59.000Z

    The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020[degree]F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

  11. Toms Creek IGCC Demonstration Project

    SciTech Connect (OSTI)

    Virr, M.J.

    1992-11-01T23:59:59.000Z

    The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020{degree}F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

  12. Post-project appraisal of Martin Canyon Creek restoration

    E-Print Network [OSTI]

    Wagner, Wayne; Roseman, Jesse

    2006-01-01T23:59:59.000Z

    Martin Canyon Creek Stream Restoration Owner’s Manual: FinalMartin Canyon Creek Stream Restoration in project documents,important component of stream restoration projects to assess

  13. Lost Creek, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:Landowners andLodgepole, Nebraska:LongboardLoretto,Los(RedirectedCreek, Texas:

  14. Blackberry Creek Daylighting Project, Berkeley : Ten-Year Post-Project Appraisal

    E-Print Network [OSTI]

    Gerson, Stephanie Karla; Wardani, Jane; Niazi, Shiva

    2005-01-01T23:59:59.000Z

    manager. Personal Communication. December Creek Currents.1994. Blackberry Creek restoration project.Creek Currents. Berkeley, California. Spring/Summer 1994. p.

  15. Post-project appraisal of year one Re-vegetation performance at the Nathanson Creek Restoration Project, Sonoma County, CA

    E-Print Network [OSTI]

    Blough, Alanna; Brandt, Reuben; Brady, Sarah

    2010-01-01T23:59:59.000Z

    performance at the Nathanson Creek Restoration Project,1. Abstract The Nathanson Creek Parkway and Preserve projectfoot reach of Nathanson Creek, a tributary to Sonoma Creek

  16. Clear Creek, Texas Flood Risk Management Project

    E-Print Network [OSTI]

    US Army Corps of Engineers

    ) of 1996 requires four distinct steps for an evaluation of economic benefits and costs for projects for an evaluation of economic benefits and costs for projects were conducted and displayed in the Economic Appendix ­ Economic Evaluation. The non-Federal projects (FEMA buyout and detention on Marys Creek) augments

  17. Assessing channel morphology following a floodplain restoration project : Wildcat Creek, Richmond, CA

    E-Print Network [OSTI]

    Holt, Ashley; Battaglia, Charles F.

    2004-01-01T23:59:59.000Z

    restore a portion of the Creek without planning for theand White, M. Lower Wildcat Creek flood control project: aProject on Lower Wildcat Creek. UC Berkeley Hydrology

  18. Canasawacta Creek Project: Chenango County, New York

    E-Print Network [OSTI]

    O’Reilly, Mary; MacEwan, David; Greco, Brandon; Nelson, Debra; Long, George; Rowen, John

    2007-01-01T23:59:59.000Z

    Abstract: The Canasawacta Creek Watershed Initiative grewthe inhabitants of the creek valley. Rather than continuefour mile stretch of the creek was performed in early June,

  19. Post project evaluation of Miller Creek (Marin, CA) restoration : vegetation survival

    E-Print Network [OSTI]

    Ting, Jantrue; Pope-Daum, Caitilin

    2004-01-01T23:59:59.000Z

    Valley Units 3-6 Miller Creek Stabilization/RestorationProject Evaluation, Miller Creek, California: Assessment oftoe of bank grade change creek channel water surface LEGEND

  20. Post-Project Appraisal of Arroyo Viejo Creek Improvement Project, Oakland, California

    E-Print Network [OSTI]

    Cousins, Mary; Storesund, Rune

    2005-01-01T23:59:59.000Z

    Appraisal of the Arroyo Viejo Creek Restoration Project. 26Cross Sections of Arroyo Viejo Creek at Arroyo Viejo Park (Sowers, J. M. 2000. Creek & Watershed Map of Oakland and

  1. A long-term post-project evaluation of an urban stream restoration project (Baxter Creek, El Cerrito, California)

    E-Print Network [OSTI]

    Purcell, Alison

    2004-01-01T23:59:59.000Z

    and V. H. Resh. 1992. Strawberry Creek on the University of1995. Biography of an urban creek. Terrain. Berkeley Ecologythe restoration project at Baxter Creek improved habitat and

  2. Swift Creek Hydroelectric Project rehabilitation, Swift Creek Power Company, Inc

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    The purpose of this report is to re-evaluate and update the original environmental analysis of the Swift Crook Hydroelectric Project rehabilitation. That analysis and the decision to allow the proponent toproceed with the project as described in the EA alternatives 3, 4, and 5 was completed an May 8, 1981. Since that decision, no action has been taken and no special-use permit has ever been issued. The Bridger-Trton National Forest completed a Forest Plan in March of 1990 which sets current direction for all lands within the Forest and new and significant issues pertaining to the amount of water to be bypassed have been raised by the public in response to this proposed project. The original proponent, Lower Valley Power and Light, sold the project and existing facilities to Swift Crack Power Company Inc. in 1984. Swift Crock Power Company has submitted a proposal to rehabilitate the existing power generation facility in Swift Creek Canyon, which will involve some significant construction and alteration of the river corridor. Theyhave also submitted an application for relicense to the Federal Energy Regulatory Commission who has asked for the Forest Service to comment on the application and to submit recommended conditions for approval (4e requirements). The proposed rehabilitation of existing facilities includes replacement of the existing damaged penstock (pipe) with a new, larger one; dredging two existing reservoirs and removal, refurbishment, and reinstallation of the turbines and generators in the two powerhouses with relocation and reconstruction of the lower powerhouse that is located on privately owned land below the Forest boundary.

  3. Smith Creek Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f < RAPID‎ |RippeyInformation SlimSloughCreek Geothermal Project

  4. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  5. Baxter Creek Gateway Park: assessment of an urban stream restoration project

    E-Print Network [OSTI]

    Goodman, Judd; Lunde, Kevin B; Zaro, Theresa

    2006-01-01T23:59:59.000Z

    Viani L. 2004. The Baxter Creek Watershed: a cultural andCity of El Cerrito, Friends of Baxter Creek, The WatershedProject, Urban Creeks Council, Restoration Design Group.

  6. EIS-0346: Salmon Creek Project, WA

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's proposal to fund activities that would restore sufficient water flows to Salmon Creek and rehabilitate its streambed as necessary to provide adequate passage for summer steelhead (Oncorhynchus mykiss) and possibly spring chinook (O. tshawytscha).

  7. An economic evaluation of the Sulphur Creek Watershed Project

    E-Print Network [OSTI]

    Burns, Henry Taylor

    1967-01-01T23:59:59.000Z

    AN ECONOMIC EVALUATION OF THF. SULPHUR CREEK VIATERSHED PROJECT A Thesis by HENRY TAYLOR BURNS Submitted to the Graduate Colleoe of the Texas ARM University in partial fulfillmeni. of the requirements for the degree oi MASTER OF SC ENCE... August 1957 Major Subject: Agricultural Eco, . omics AN ECONOMIC EVALUATION OF THE SULPHUR CREEK 0/ATERSHED ?ROJFCT A Thesis by HENRY TAYLOR BURNS Approveo as to style and content by: /@~me::P~+' . J~'. ~&e. -' Read of Deparrner't, (Meeker j . 8...

  8. Couse/Tenmile Creeks Watershed Project Implementation : 2007 Conservtion Projects. [2007 Habitat Projects Completed].

    SciTech Connect (OSTI)

    Asotin County Conservation District

    2008-12-10T23:59:59.000Z

    The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on private lands within Asotin County watersheds. The Tenmile Creek watershed is a 42 square mile tributary to the Snake River, located between Asotin Creek and the Grande Ronde River. Couse Creek watershed is a 24 square mile tributary to the Snake River, located between Tenmile Creek and the Grande Ronde River. Both watersheds are almost exclusively under private ownership. The Washington Department of Fish and Wildlife has documented wild steelhead and rainbow/redband trout spawning and rearing in Tenmile Creek and Couse Creek. The project also provides Best Management Practice (BMP) implementation throughout Asotin County, but the primary focus is for the Couse and Tenmile Creek watersheds. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Farm Service Agency (FSA), Salmon Recovery Funding Board (SRFB), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe (NPT), Washington Department of Ecology (DOE), National Marine Fisheries Service (NOAA Fisheries), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. The Asotin Subbasin Plan identified priority areas and actions for ESA listed streams within Asotin County. Couse Creek and Tenmile Creek are identified as protection areas in the plan. The Conservation Reserve Enhancement Program (CREP) has been successful in working with landowners to protect riparian areas throughout Asotin County. Funding from BPA and other agencies has also been instrumental in protecting streams throughout Asotin County by utilizing the ridge top to ridge top approach.

  9. EIS-0415: Deer Creek Station Energy Facility Project, South Dakota

    Broader source: Energy.gov [DOE]

    This EIS analyzes WAPA's decision to approve the interconnection request made by Basin Electric Power Cooperative (Basin Electric) with the USDA Rural Utilities Service (RUS) proposing to provide financial assistance, for the Deer Creek Station Project, a proposed 300-megawatt (MW) natural gas-fired generation facility.

  10. NAME: Green Gulch Creek Stream Restoration Project LOCATION: Redwood Creek Watershed in Marin County, CA (closest town is Muir Beach)

    E-Print Network [OSTI]

    US Army Corps of Engineers

    NAME: Green Gulch Creek Stream Restoration Project LOCATION: Redwood Creek Watershed in Marin County, CA (closest town is Muir Beach) ACRES: 1.5 acres riparian habitat; 0.3 miles of stream channel-modified, straightened, and downcut channel; relocate the farm road and fences paralleling the stream to provide

  11. Assessing the Feasibility of Creek Daylighting in San Francisco, Part I: A Synthesis of Lessons Learned from Existing Urban Daylighting Projects

    E-Print Network [OSTI]

    Smith, Brooke Ray

    2007-01-01T23:59:59.000Z

    Factors in Environmental Restoration: Strawberry Creek andBaxter Creek. Water Resource Center Archives, University ofNiazi. 2005. Blackberry Creek Daylighting Project, Berkeley:

  12. 18 years of restoration on Codornices Creek

    E-Print Network [OSTI]

    Fullmer, Chris

    2008-01-01T23:59:59.000Z

    Friends of Five Creeks Projects."  Friends of Five Creeks.  Friends of Five Creeks.  25 Nov.   2008 Creeks  Council.  Urban Creeks 

  13. Post Project Appraisal of Village Creek Restoration, Albany, CA

    E-Print Network [OSTI]

    Asher, Melissa; Atapattu, Kaumudi

    2005-01-01T23:59:59.000Z

    11/20/05 Schwartz, Susan. Creek mouths along the Bay TrailOakland Museum of California Creek and Watershed InformationSource. “Codornices Creek Watershed”. Guide to San Francisco

  14. Granite Creek Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG Contracting JumpGove County,Texas: EnergyOhio:Geothermal Project Jump

  15. Swift Creek Hydroelectric Project rehabilitation, Swift Creek Power Company, Inc. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    The purpose of this report is to re-evaluate and update the original environmental analysis of the Swift Crook Hydroelectric Project rehabilitation. That analysis and the decision to allow the proponent toproceed with the project as described in the EA alternatives 3, 4, and 5 was completed an May 8, 1981. Since that decision, no action has been taken and no special-use permit has ever been issued. The Bridger-Trton National Forest completed a Forest Plan in March of 1990 which sets current direction for all lands within the Forest and new and significant issues pertaining to the amount of water to be bypassed have been raised by the public in response to this proposed project. The original proponent, Lower Valley Power and Light, sold the project and existing facilities to Swift Crack Power Company Inc. in 1984. Swift Crock Power Company has submitted a proposal to rehabilitate the existing power generation facility in Swift Creek Canyon, which will involve some significant construction and alteration of the river corridor. Theyhave also submitted an application for relicense to the Federal Energy Regulatory Commission who has asked for the Forest Service to comment on the application and to submit recommended conditions for approval (4e requirements). The proposed rehabilitation of existing facilities includes replacement of the existing damaged penstock (pipe) with a new, larger one; dredging two existing reservoirs and removal, refurbishment, and reinstallation of the turbines and generators in the two powerhouses with relocation and reconstruction of the lower powerhouse that is located on privately owned land below the Forest boundary.

  16. Moab Project Exceeds 5 Years of Operations Without Lost-Time...

    Energy Savers [EERE]

    JUNCTION, Colo. - It has been more than five years since workers on the Moab Uranium Mill Tailings Remedial Action Project in Utah had a lost-time injury or illness. This...

  17. West Foster Creek Expansion Project 2007 HEP Report.

    SciTech Connect (OSTI)

    Ashley, Paul R.

    2008-02-01T23:59:59.000Z

    During April and May 2007, the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) conducted baseline Habitat Evaluation Procedures (HEP) (USFWS 1980, 1980a) analyses on five parcels collectively designated the West Foster Creek Expansion Project (3,756.48 acres). The purpose of the HEP analyses was to document extant habitat conditions and to determine how many baseline/protection habitat units (HUs) to credit Bonneville Power Administration (BPA) for funding maintenance and enhancement activities on project lands as partial mitigation for habitat losses associated with construction of Grand Coulee and Chief Joseph Dams. HEP evaluation models included mule deer (Odocoileus hemionus), western meadowlark (Sturnella neglecta), sharp-tailed grouse, (Tympanuchus phasianellus), Bobcat (Lynx rufus), mink (Neovison vison), mallard (Anas platyrhynchos), and black-capped chickadee (Parus atricapillus). Combined 2007 baseline HEP results show that 4,946.44 habitat units were generated on 3,756.48 acres (1.32 HUs per acre). HEP results/habitat conditions were generally similar for like cover types at all sites. Unlike crediting of habitat units (HUs) on other WDFW owned lands, Bonneville Power Administration received full credit for HUs generated on these sites.

  18. Rock creek multiple coal streams project. Final report, July 1984-November 1994

    SciTech Connect (OSTI)

    Saulsberry, J.L.; Lambert, S.W.; Wallace, J.A.; Spafford, S.D.; Steidl, P.F.

    1995-12-01T23:59:59.000Z

    The report summarizes the research conducted at the Rock Creek Project from 1984 to 1994. The Rock Creek Project was a field laboratory with the purpose of determining the best methods to produce methane from multiple coal seams. The site is located in the Oak Grove field of the Black Warrior Basin approximately 15 miles west of Birmingham, Alabama. The research performed under the Rock Creek Project involved: resource evaluation, reservoir testing, completion techniques, stimulation design and evaluation, operational methods, production forecasting, and remedial stimulations. Offsite cooperative research with other operators was also performed as part of the project. In addition to developing new technology, the work at Rock Creek demonstrated how existing technology from mining, groundwater hydrology, and the petroleum industry could be applied to coalbed methane production. The work also highlighted the pitfalls associated with some of the technology that was being used by certain operators.

  19. NORTH HILL CREEK 3-D SEISMIC EXPLORATION PROJECT

    SciTech Connect (OSTI)

    Marc T. Eckels; David H. Suek; Denise H. Harrison; Paul J. Harrison

    2004-05-06T23:59:59.000Z

    Wind River Resources Corporation (WRRC) received a DOE grant in support of its proposal to acquire, process and interpret fifteen square miles of high-quality 3-D seismic data on non-allotted trust lands of the Uintah and Ouray (Ute) Indian Reservation, northeastern Utah, in 2000. Subsequent to receiving notice that its proposal would be funded, WRRC was able to add ten square miles of adjacent state and federal mineral acreage underlying tribal surface lands by arrangement with the operator of the Flat Rock Field. The twenty-five square mile 3-D seismic survey was conducted during the fall of 2000. The data were processed through the winter of 2000-2001, and initial interpretation took place during the spring of 2001. The initial interpretation identified multiple attractive drilling prospects, two of which were staked and permitted during the summer of 2001. The two initial wells were drilled in September and October of 2001. A deeper test was drilled in June of 2002. Subsequently a ten-well deep drilling evaluation program was conducted from October of 2002 through March 2004. The present report discusses the background of the project; design and execution of the 3-D seismic survey; processing and interpretation of the data; and drilling, completion and production results of a sample of the wells drilled on the basis of the interpreted survey. Fifteen wells have been drilled to test targets identified on the North Hill Creek 3-D Seismic Survey. None of these wildcat exploratory wells has been a dry hole, and several are among the best gas producers in Utah. The quality of the data produced by this first significant exploratory 3-D survey in the Uinta Basin has encouraged other operators to employ this technology. At least two additional 3-D seismic surveys have been completed in the vicinity of the North Hill Creek Survey, and five additional surveys are being planned for the 2004 field season. This project was successful in finding commercial oil, natural gas and natural gas liquids production on a remote part of the Uintah & Ouray Reservation. Much of the natural gas and natural gas liquids are being produced from the Wingate Formation, which to our knowledge has never produced commercially anywhere. Another large percentage of the natural gas is being produced from the Entrada Formation which has not previously produced in this part of the Uinta Basin. In all, at least nine geologic formations are contributing hydrocarbons to these wells. This survey has clearly established the fact that high-quality data can be obtained in this area, despite the known obstacles.

  20. Post-Project Appraisal of Crocker Creek Dam Removal Project, Sonoma Co., California

    E-Print Network [OSTI]

    Downing-Kunz, Maureen; Dudley, Colin; Gilbreath, Alicia

    2005-01-01T23:59:59.000Z

    at 1030. CDFG, Crocker Creek (Russian River tributary)on 12/6/05 at CDFG, Crocker Creek (Russian River tributary)Agency (SCWA), “ Crocker Creek Instream Habitat Restoration

  1. Post-project appraisal of the Sausal Creek restoration project, Oakland, California

    E-Print Network [OSTI]

    Eagon, Elizabeth; Largent, Jonathan

    2005-01-01T23:59:59.000Z

    at El Centro Friends of Sausal Creek mobilizing for macro-28: Erosion due to informal creek crossing at rock weirhttp://www.oaklandpw.com/creeks/sausal_complete.htm. Downs,

  2. Spring Creek Project for Ideas, Nature, and the Written Word Call for Nominations: Graduate Student Research and Writing Retreat

    E-Print Network [OSTI]

    GrĂĽnwald, Niklaus J.

    Spring Creek Project for Ideas, Nature, and the Written Word Call for Nominations: Graduate Student on a collaborative project or two graduate students who each have individual projects are invited to nominate graduate students in the humanities or environmental sciences

  3. Post Project Analysis of a Restored Reach of Redwood Creek

    E-Print Network [OSTI]

    Docto, Mia; Corvillon, Daniela Pena

    2012-01-01T23:59:59.000Z

    benchmark  for  stream  restoration  projects  (Dunne  &  the  stream  inventory  two  restoration  projects  have  production  stream.  Two  restoration  projects  have  

  4. Evaluation of dredged material proposed for ocean disposal from Westchester Creek project area, New York

    SciTech Connect (OSTI)

    Pinza, M.R.; Gardiner, W.W.; Barrows, E.S.; Borde, A.B.

    1996-11-01T23:59:59.000Z

    The objective of the Westchester Creek project was to evaluate proposed dredged material from this area to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Westchester Creek was one of five waterways that the US Army Corps of Engineers- New York District (USACE-NYD) requested the Battelle/Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in May 1995. The evaluation of proposed dredged material from the Westchester Creek project area consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, benthic acute and water-column toxicity tests, and bioaccumulation studies. Thirteen individual sediment core samples were collected from this area and analyzed for grain size, moisture content, and total organic carbon (TOC). One composite sediment sample representing the Westchester Creek area to be dredged, was analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAHs), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended- particulate phase (SPP) of the Westchester Creek sediment composite, was analyzed for metals, pesticides, and PCBS.

  5. White Creek Wind Power Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTri GlobalJump to:Westwood Renewables Jump to:meaningWillow I WindCreek

  6. A post project appraisal of the restoration/rehabilitation of Alamo Creek

    E-Print Network [OSTI]

    Smolko, Darrell

    2003-01-01T23:59:59.000Z

    Associates, Ltd. , Alamo Creek: Conceptual Restoration Plan/Basis of Design Summary Alamo Creek Restoration, Phase 1aRehabilitation of Alamo Creek Darrell Smolko UC Berkeley

  7. Post project evaluation, Miller Creek, California : assessment of stream bed morphology, and recommendations for future study

    E-Print Network [OSTI]

    Yin, Wan-chih; Pope-Daum, Caitilin

    2004-01-01T23:59:59.000Z

    1989) Grading Plan, Miller Creek Phases 5 and 6. PreparedValley Units 3-6, Miller Creek Stabilization/Restorationchannel restoration: Miller Creek, Marin County, California.

  8. Post project appraisal of Green Valley Creek, Solano County, California : design and management review

    E-Print Network [OSTI]

    Martin, Maureen; Fortin, Alex

    2003-01-01T23:59:59.000Z

    Associates, 1991. Green Valley Creek Restoration Plan. Beck,1996. Green Valley Creek Post-Construction Monitoring 3 Year1998. Green Valley Creek Post-Construction Monitoring 5

  9. Post-Project Assessment of the 2003 Cerrito Creek Restoration and Recommendations for Additional Stormwater Management

    E-Print Network [OSTI]

    Adlong, Michelle; Cook, Michael; Kennedy, Matthew

    2011-01-01T23:59:59.000Z

    Design. 2011. Cerrito Creek Bay Trail Connector Feasibilitywww.altaplanning.com/cerrito+creek+bay+trail+connector+Baxter and Cerrito Creeks." El Cerrito, CA - Official

  10. Habitat Projects Completed within the Asotin Creek Watershed, 1999 Completion Report.

    SciTech Connect (OSTI)

    Johnson, Bradley J.

    2000-01-01T23:59:59.000Z

    The Asotin Creek Model Watershed Program (ACMWP) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The Asotin Creek watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in WRIA 35. According to WDFW's Priority WRIA's by At-Risk Stock Significance Map, it is the highest priority in southeastern WA. Snake River spring chinook salmon, summer steelhead and bull trout, which are listed under the Endangered Species Act (ESA), are present in the watershed. The ACMWP began coordinating habitat projects in 1995. Approximately two hundred seventy-six projects have been implemented through the ACMWP as of 1999. Twenty of these projects were funded in part through Bonneville Power Administration's 1999 Columbia Basin Fish and Wildlife Program. These projects used a variety of methods to enhance and protect watershed conditions. In-stream work for fish habitat included construction of hard structures (e.g. vortex rock weirs), meander reconstruction, placement of large woody debris (LWD) and whole trees and improvements to off-channel rearing habitat; thirty-eight were created with these structures. Three miles of stream benefited from riparian improvements such as vegetative plantings (17,000 trees and shrubs) and noxious weed control. Two sediment basin constructions, 67 acres of grass seeding, and seven hundred forty-five acres of minimum till were implemented to reduce sediment production and delivery to streams in the watershed.

  11. Along Sausal Creek : an assessment of vegetation, habitat, and morphology of an adopted urban creek

    E-Print Network [OSTI]

    Chanse, Vikki; Herron, Christy

    2003-01-01T23:59:59.000Z

    Lower Reaches of Sausal Creek, Oakland, California." ReportInstitute and Friends of Sausal Creek. Paulsell, Karen.2003. “Sausal Creek Revegetation Project Understory

  12. Evolution of a Compound Channel: Tassajara Creek, Dublin, California

    E-Print Network [OSTI]

    Butler, Nathaniel L.; Nolan, Lindsey

    2007-01-01T23:59:59.000Z

    Morphology in the Tassajara Creek Restoration Project Area:Back: Monitoring the Tassajara Creek Restoration Project. UCBed Elevation Tassajara Creek. UC Berkeley Water Resources

  13. The removal of Saeltzer Dam on Clear Creek : an update

    E-Print Network [OSTI]

    Ferry, Mike; Miller, Peter

    2003-01-01T23:59:59.000Z

    Fish Passage Project: Clear Creek, Shasta County. Norman S.Management 1996 Lower Clear Creek Watershed Analysis, BureauMatthews &Associates 1999 Clear Creek Rehabilitation Project

  14. Evaluation of dredged material proposed for ocean Disposal from Shoal Harbor/Compton Creek Project Area

    SciTech Connect (OSTI)

    Gardiner, W.W.; Borde, A.B.; Nieukirk, S.L.; Barrows, E.S.; Gruendell, B.D.; Word, J.Q.

    1996-10-01T23:59:59.000Z

    The objective of the Shoal Harbor/Compton Creek Project was to evaluate proposed dredged material from the Shoal harbor/Compton Creek Project Area in Belford and Monmouth, New Jersey to determine its suitability for unconfined ocean disposal at the Mud Dump Site. This was one of five waterways that the US Army Corps of Engineers- New York District requested the Battelle Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in May 1995. The evaluation of proposed dredged material from the Shoal Harbor/Compton Creek Project area consisted of bulk chemical analyses, chemical analyses of dredging site water and elutriate, benthic and water-column acute toxicity tests and bioaccumulation studies. Eleven core samples were analyzed or grain size, moisture content, and total organic carbon. Other sediments were evaluated for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congers, polynuclear aromatic hydrocarbons, and 1,4- dichlorobenzene. Dredging site water and elutriate water were analyzed for metals, pesticides, and PCBs.

  15. Fifteenmile Creek Riparian Buffers Project, Annual Report 2002-2003.

    SciTech Connect (OSTI)

    Graves, Ron

    2004-02-01T23:59:59.000Z

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Fifteenmile Subbasin Summary, June 30, 2000. The project is providing the technical planning support needed to implement at least 36 riparian buffer system contracts on approximately 872 acres covering an estimated 40 miles of anadromous fish streams over a three year period. During this second year of the project, 11 buffer contracts were implemented on 10.9 miles of stream. Buffer widths averaged 132 ft. on each side of the stream. Implementation included prescribed plantings, fencing, and related practices. Actual implementation costs, lease payments, and maintenance costs are borne by existing USDA programs: Conservation Reserve and Conservation Reserve Enhancement Programs. The lease period of each contract may vary between 10 to 15 years. During this year the average was 14.6 years. The total value of contracts established this year is $666,121 compared with $71,115 in Bonneville Power Administration (BPA) contract costs to provide the technical support needed to get the contracts implemented. This project provides technical staffing to conduct assessments and develop plans to help keep pace with the growing backlog of potential riparian buffer projects. Word of mouth from satisfied customers has brought in many new sign-ups during the year. In addition, specific outreach efforts targeting the orchard areas of the county began to bear fruit with orchardists sign-ups as the project year ended. Progress this second year of project includes only work accomplished in the Fifteenmile subbasin. A similar but separate effort to implement buffers in the Columbia Plateau Province was initiated during the year under project number 2002-019-00. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion.

  16. Post-project appraisal of a channel reconstruction on Cuneo Creek, California

    E-Print Network [OSTI]

    Hansen, Aren

    2003-01-01T23:59:59.000Z

    a case study at Bull Creek, Humboldt Redwoods State Park.Rosgen, D. 1991. Bull Creek Watershed Restoration Plan,the South Fork of Cuneo Creek and contributes large amounts

  17. Post-project appraisal of lower Ritchie Creek dam removal, Napa County

    E-Print Network [OSTI]

    Daniels, Jubilee; Pagano, Laura

    2004-01-01T23:59:59.000Z

    Appraisal of Lower Ritchie Creek Dam Removal, Napa CountyApril 2004 Abstract Ritchie Creek drains 2.6 square milesdam was built in 1912 on Ritchie Creek to facilitate water

  18. Post-Project Appraisal for the Winter Creek Restoration Redwood Grove, UC Botanical Gardens at Berkeley

    E-Print Network [OSTI]

    Fiala, Shannon; Janes, Kelly; Sousa, Ricardo

    2010-01-01T23:59:59.000Z

    in this reach of Winter Creek? 3. How did construction4. Pre-restoration. Winter Creek, looking upstream. 2005.5. Pre-restoration. Winter Creek, looking downstream. 2005.

  19. Hydrology of Deer Creek and its tributaries : a contribution to planning a restoration project

    E-Print Network [OSTI]

    Skrtic, Lana

    2005-01-01T23:59:59.000Z

    in text) Table 2: Deer Creek – Chronology of Peak Flows,Return Periods, extrapolated from Oregon Creek data Table 3:Flow Estimates on Deer Creek and its Tributaries Table 4:

  20. Cypress Creek Project Building A Watershed Protection Plan

    E-Print Network [OSTI]

    projections · No regional water/WWTP services · Good water quality with some degrading trends · Lack on Environmental Quality www.cypresscreekproject.org #12;#12;#12;#12;#12;#12;WHISKEY IS FOR DRINKIN'& WATER 97,589 (2000) 437,000 (2050) · Water demand ­ Total water use 17% 1990-2004 ­ Withdrawals from

  1. A postdevelopmental evaluation of Langford Creek Watershed Project

    E-Print Network [OSTI]

    Rico, Luis

    1971-01-01T23:59:59.000Z

    amortized over the 50 years estimated useful life of the works of improvement to determine total annual installation costs. The actual operation and maintenance costs were averaged over the period of analysis to determine annual operation and maintenance... costs Actual installation costs were found to exceed the Soil Conser- vation Service estimate by $4, 336 annually while the annual cost of operation and maintenance of the project were $841 less than the work plan estimate. Benefits generated as a...

  2. Post-Project Performance Assessment of a Multi-Phase Urban Stream Restoration Project on Lower Codornices Creek

    E-Print Network [OSTI]

    Docto, Mia; Hoffman, Johanna; Walls, Scott

    2011-01-01T23:59:59.000Z

    1688.1990.tb01380.x. Codornices Creek Restoration, PHASE 11.Vol. 04-108. Urban Creeks Council, Berkeley, CA. 37 pp. + 4Engineering. 2010. Results of Creek Monitoring Codornices

  3. Johnson Creek Artificial Propagation and Enhancement Project Operations and Maintenance Program; Brood Year 2000: Johnson Creek Chinook Salmon Supplementation, Biennial Report 2000-2002.

    SciTech Connect (OSTI)

    Daniel, Mitch; Gebhards, John; Hill, Robert

    2003-05-01T23:59:59.000Z

    The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek through artificial propagation. Adult chinook salmon trapping, broodstock selection, and spawning was first implemented in 1998, did not occur in 1999, and was resumed in 2000. A total of 152 salmon were trapped in Johnson Creek in 2000, of which 73 (25 males, 16 females, and 32 jacks) fish were transported to Idaho Fish and Game=s South Fork Salmon River adult holding and spawning facility for artificial propagation purposes. The remaining 79 (29 males, 16 females, and 24 jacks) fish were released above the weir to spawn naturally. A total of 65,060 green eggs were taken from 16 female salmon and transported to the McCall Fish Hatchery for incubation and rearing. Egg counts indicated an average eye-up rate of 86.0% for 55,971 eyed eggs. Average fecundity for Johnson Creek females was 4,066 eggs per female. Juvenile fish were reared indoors at the McCall Fish Hatchery through November 2001. These fish were transferred to outdoor rearing facilities in December 2001 where they remained until release in March 2002. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags. In addition 9,987 were also PIT tagged. Hand counts provided by marking crews were used to amend the number of juvenile salmon released from the original egg count. A total of 57,392 smolts were released into a temporary acclimation channel in Johnson Creek on March 18, 19, 20, 2002. These fish were held in this facility until a fish screen was removed on March 22, 2002 and the fish were allowed to emigrate.

  4. Rainwater in the Urban Landscape: The Garrison Creek Demonstration Project [Infrastructure as Landscape, Landscape as Infrastructure

    E-Print Network [OSTI]

    Brown, James; Storey, Kim

    1996-01-01T23:59:59.000Z

    ^7 ' g s PLACES BROWN AND ST O RE Y : G A RR I SO N CREEKspace. Toronto's Garrison Creek is a typical example of theits landscape. Today the creek flows through an elaborate,

  5. Hydrology of Deer Creek and its tributaries : a contribution to planning a restoration project

    E-Print Network [OSTI]

    Skrtic, Lana

    2005-01-01T23:59:59.000Z

    data is not useful in developing a flood frequency curve for Deer Creek because the gauge records discharge from the powerhouse. (

  6. Redwood Creek, Marin County 2010 Monitoring Study of a Salmonid Habitat Stream Restoration Project: Seven-­?Year Post-­?Project Evaluation

    E-Print Network [OSTI]

    Crockett, Richard; Cundy, Fiona; Hanley, Colin

    2010-01-01T23:59:59.000Z

    Trends  in  Lagunitas  and  Redwood  Creek  Mt.  Tamalpais  n.d.   "Lower  Redwood  Creek."   nps.gov.   Golden  Gate  J.  Toby.  "Redwood  Creek  Topographic  Change  Write-­?

  7. A Watershed Approach to Urban River Restoration: A Conceptual Restoration Plan for Sausal Creek

    E-Print Network [OSTI]

    Ippolito, Teresa; Podolak, Kristen

    2008-01-01T23:59:59.000Z

    appraisal of the Sausal Creek restoration project, Oakland,Assessment of Sausal Creek: Physical Setting, Habitatmorphology of Sausal Creek, Oakland, California. Water

  8. Islais Creek reinterpreted: An exploration of restoration designs in the urbanized context of San Francisco

    E-Print Network [OSTI]

    Griffith, Lucas A

    2006-01-01T23:59:59.000Z

    Survey Figure – 1869 Islais Creek Watershed Figure – 1013Soil Map Figure – Islais Creek Watershed (Dot is projectFigures Figure – Islais Creek Historic Profile Figure – 1904

  9. Post-Project Appraisal of Baxter Creek at Booker T. Anderson Park : Shopping Carts - The New Boulders

    E-Print Network [OSTI]

    Bronner, Colleen; McKeon, Maggie; Weston, Janel

    2005-01-01T23:59:59.000Z

    water deposition BAXTER CREEK X-SECTION V, NOVEMBER 2005Cross Section VI: BAXTER CREEK X-SECTION VI, JANUARY 2001water deposition BAXTER CREEK X-SECTION VI, NOVEMBER 2005

  10. Moab Project Logs 2 Million Work Hours Without Lost-Time Injury...

    Office of Environmental Management (EM)

    number 1,584 may not mean much to most people, but for the workers on EM's Moab Uranium Mill Tailings Remedial Action Project, it represents the number of days without a...

  11. EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

  12. Lost Creek Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOf KilaueaInformation Other4Q07) Wind Farm Jump1 JumpBeachVientos

  13. Columbia River Wildlife Mitigation Habitat Evaluation Procedures Report / Scotch Creek Wildlife Area, Berg Brothers, and Douglas County Pygmy Rabbit Projects.

    SciTech Connect (OSTI)

    Ashley, Paul R.

    1997-01-01T23:59:59.000Z

    This Habitat Evaluation Procedure study was conducted to determine baseline habitat units (HUs) on the Scotch Creek, Mineral Hill, Pogue Mountain, Chesaw and Tunk Valley Habitat Areas (collectively known as the Scotch Creek Wildlife Area) in Okanogan County, Sagebrush Flat and the Dormaler property in Douglas County, and the Berg Brothers ranch located in Okanogan County within the Colville Reservation. A HEP team comprised of individuals from the Washington Department of Fish and Wildlife, the Confederated Tribes of the Colville Reservation, and the Natural Resources Conservation Service (Appendix A) conducted baseline habitat surveys using the following HEP evaluation species: mule deer (Odocoileus hemionus), sharp-tailed grouse (Tympanuchus phasianellus), pygmy rabbit (Brachylagus idahoensis), white-tailed deer (Odocoileus virginiana), mink (Mustela vison), Canada goose (Branta canadensis), downy woodpecker (Picoides pubescens), Lewis woodpecker (Melanerpes lewis), and Yellow warbler (Dendroica petechia). Results of the HEP analysis are listed below. General ratings (poor, marginal, fair, etc.,) are described in Appendix B. Mule deer habitat was marginal lacking diversity and quantify of suitable browse species. Sharp-tailed grouse habitat was marginal lacking residual nesting cover and suitable winter habitat Pygmy rabbit habitat was in fair condition except for the Dormaier property which was rated marginal due to excessive shrub canopy closure at some sites. This report is an analysis of baseline habitat conditions on mitigation project lands and provides estimated habitat units for mitigation crediting purposes. In addition, information from this document could be used by wildlife habitat managers to develop management strategies for specific project sites.

  14. The perfect storm : flow through a restored compound channel : Tassajara Creek, Dublin, CA : assessment of the roughness, flow, floodplain conveyance, and compound channel capacity of the restoration of Tassajara Creek from the high-water marks of a 20-year storm

    E-Print Network [OSTI]

    Chan, Andre; Heard, Sarah K

    2006-01-01T23:59:59.000Z

    Morphology in the Tassajara Creek Restoration Project Area:Compound Channel, Tassajara Creek, Dublin, CA Andre Chan andBack: Monitoring the Tassajara Creek Restoration Project. UC

  15. Hoe Creek experiments: LLNL's underground coal-gasification project in Wyoming

    SciTech Connect (OSTI)

    Stephens, D.R.

    1981-10-01T23:59:59.000Z

    Under the sponsorship of the US Department of Energy and predecessor organizations, the Lawrence Livermore National Laboratory carried out a laboratory program and three field, underground coal gasification tests near Gillette, Wyoming. This report summarizes that work. Three methods of linking or connecting injection and production wells were used for the UCG field tests: Hoe Creek No. 1 employed explosive fracturing, Hoe Creek No. 2 featured use of reverse combustion, and directional drilling was used for the Hoe Creek No. 3. The Gas Research Institute cosponsored the latter test. Laboratory experiments and modeling, together with a laboratory and field environment program, are necessary adjuncts to the field program. Explosive fracturing in coal was simulated using computer models and laboratory tests. We developed a relationship of total inelastic strains to permeability, which we used to design and interpret a coal outcrop, explosive fracturing experiment at Kemmerer, Wyoming. Coal gasification was also simulated in laboratory experiments and with computer models. The primary aim has been to predict and correlate reaction, thermal-front propagation rates, and product gas composition as a function of bed properties and process operating conditions. Energy recovery in the form of produced gas and liquids amounted to 73% of the energy in the consumed coal. There were essentially no losses to the subsurface formation. The greatest energy loss was in steam production.

  16. Post-Project Evaluation of Channel Morphology, Invasive Plant Species, and Native Fish Habitat in Putah Creek in Winters, CA Six Years After Channel Relocation

    E-Print Network [OSTI]

    Blackledge, Gina; Boisrame, Gabrielle

    2011-01-01T23:59:59.000Z

    Resources Association 46(2):211-226. Putah Creek Council.2007. Putah Creek Explorer Book. Accessed November 2011. creek- watershed>. StreamWise.

  17. Microsoft Word - CoyoteCreekNE_CX

    Broader source: Energy.gov (indexed) [DOE]

    Project Manager - KEWM-4 Proposed Action: Coyote Creek Property Acquisition Funding Fish and Wildlife Project No.: 2011-003-00, Contract BPA-007521 Categorical Exclusion...

  18. Wildlife and Wildlife Habitat Loss Assessment at Hills Creek Dam and Reservoir Project, Middle Fork Willamette River, Oregon, 1985 Final Report.

    SciTech Connect (OSTI)

    Noyes, J.H.

    1985-09-01T23:59:59.000Z

    A habitat based assessment was conducted of the US Army Corps of Engineers' Hills Creek Dam and Reservoir Project on the Middle Fork Willamette River, Oregon, to determine losses or gains resulting from the development and operation of the hydroelectric related components of the project. Preconstruction, postconstruction, and recent vegetation cover types of the project site were mapped based on aerial photographs from 1944, 1964, and 1979, respectively. Vegetation cover types were identified within the affected area and acreages of each type at each period were determined. Fifteen wildlife target species were selected to represent a cross-section of species groups affected by the project. An interagency team evaluated the suitability of the habitat to support the target species at each time period. An evaluation procedure which accounted for both the quantity and quality of habitat was used to aid in assessing impacts resulting from the project. The Hills Creek Project extensively altered or affected 4662 acres of land and river in the Middle Fork Willamette River drainage. Impacts to wildlife centered around the loss of 2694 acres of old-growth forest and 207 acres of riparian habitat. Impacts resulting from the Hills Creek Project included the loss of winter range for Roosevelt elk, and the loss of year-round habitat for black-tailed deer, black bear, cougar, river otter, beaver, ruffed grouse, spotted owl, and other nongame species. Bald eagle and osprey were benefited by an increase in foraging habitat. The potential of the affected area to support wildlife was greatly altered as a result of the Hills Creek Project, losses or gains in the potential of the habitat to support wildlife will exist over the life of the project.

  19. Post-Project Assessment of the 2003 Cerrito Creek Restoration and Recommendations for Additional Stormwater Management

    E-Print Network [OSTI]

    Adlong, Michelle; Cook, Michael; Kennedy, Matthew

    2011-01-01T23:59:59.000Z

    that in the future, stream restoration projects installrecommend that future stream restoration projects considerrestoration, while in the six years since the entire stream

  20. Baxter Creek Gateway Park: assessment of an urban stream restoration project

    E-Print Network [OSTI]

    Goodman, Judd; Lunde, Kevin B; Zaro, Theresa

    2006-01-01T23:59:59.000Z

    of a Small Urban Stream Restoration Project in Northernfor: LA 227- Restoration of Rivers and Streams Instructor:restoration project was constructed with aspects of stream

  1. A long-term post-project evaluation of an urban stream restoration project (Baxter Creek, El Cerrito, California)

    E-Print Network [OSTI]

    Purcell, Alison

    2004-01-01T23:59:59.000Z

    1995. Evaluating stream restoration projects. Environmentalof a small, urban stream restoration project in northernhistory of urban stream restoration. Aquatic Conservation:

  2. NAME: Salt Creek Estuary Restoration LOCATION: Salt Creek Watershed, Clallam County, Washington

    E-Print Network [OSTI]

    US Army Corps of Engineers

    NAME: Salt Creek Estuary Restoration LOCATION: Salt Creek Watershed, Clallam County, Washington Federal funds $0 PROJECT DESCRIPTION: The Salt Creek Estuary Reconnection project will significantly enhance tidal and fluvial hydrology to 22.5 acres of salt marsh, which will return the salt marsh to its

  3. Bacterial Monitoring for the Buck Creek Watershed

    E-Print Network [OSTI]

    The “Bacterial Monitoring for the Buck Creek Watershed” project was developed in response to the creek’s listing on the Texas Water Quality Inventory and 303(d) List due to a bacterial impairment and subsequent total maximum daily load (TMDL...

  4. Post-Project Performance Assessment of a Multi-Phase Urban Stream Restoration Project on Lower Codornices Creek

    E-Print Network [OSTI]

    Docto, Mia; Hoffman, Johanna; Walls, Scott

    2011-01-01T23:59:59.000Z

    of a Multi-Phase Urban Stream Restoration Project on Lowerof a Multi-Phase Urban Stream Restoration Project on Lowerof a Multi-Phase Urban Stream Restoration Project on Lower

  5. Unpaving the Way to Creek Restoration in Lower Sausal Creek Watershed: Applying the EU Water Framework Directive to a US Urban Watershed

    E-Print Network [OSTI]

    Li, Hong; Wardani, Jane

    2008-01-01T23:59:59.000Z

    per 10,000 sq ft $0.8 per 10,000 sq ft Creek restoration***Daylighting culverted creeks Open channel Engineered channelbased on cost of Peralta Creek restoration project in lower

  6. Microsoft Word - Ninemile_Creek_CX.doc

    Broader source: Energy.gov (indexed) [DOE]

    Tribes of the Colville Reservation for purchase of the Ninemile Creek property Fish and Wildlife Project No.: 2008-104-00, BPA-005670 Categorical Exclusion Applied (from...

  7. Microsoft Word - Coyote Creek CX.docx

    Broader source: Energy.gov (indexed) [DOE]

    of funds to acquire a conservation easement over the 310-acre Coyote Creek property. Fish and Wildlife Project No.: 2011-003-00, Contract BPA-006468 Categorical Exclusion...

  8. Case Study: Goose Creek CISD

    E-Print Network [OSTI]

    White, D.

    2014-01-01T23:59:59.000Z

    GOOSE CREEK CISD FINANCIALS • $4,866,124 project • $600k annual savings • 5,954,383 kWh annual savings IMPROVEMENTS • Lighting and water efficiency, computer power management, HVAC, controls redesign case study McKinstry first worked with Goose... Creek CISD performing retro-commissioning through the Centerpoint/Nexant RCx rebate program. McKinstry found additional projects with good returns on investment, warranting a performance contract. Working with the district to apply for the State...

  9. LLL in situ coal gasification project. Quarterly progress report, October-December 1979. [Hoe Creek No. 3 and planning

    SciTech Connect (OSTI)

    Cena, R.J.; Strack, B.S. (eds.)

    1980-04-23T23:59:59.000Z

    The major effort this quarter has been postexperiment analysis of Hoe Creek No. 3 and planning for future gasification experiments. Hoe Creek No. 3: Thermal data have been analyzed to determine the performance of the drilled horizontal channel during forward gasification. Thermal and material balance data are combined to determine late-time burn boundaries for the experiment. Surface subsidence after the experiment was completed is described. Process wells were inspected to determine failure characteristics and pinpoint late-time injection location. Ground-water quality before and after Hoe Creek No. 3 and the effects of aquifer interconnection on hydraulic measurements at the Hoe Creek No. 2 and No. 3 sites are discussed. Future experiments: Potential UCG sites are being characterized for future tests. Two sites in the Powder River Basin near Gillette, Wyoming are discussed. Preliminary plans for a deep site gasification experiment and a new method for in situ gasification of thick seams are presented.

  10. E-Print Network 3.0 - asotin creek fencing Sample Search Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Plants 10 Volunteers removing sandbags Completed project site Summary: Campbell Creek Restoration Anchorage, Alaska Campbell Creek is an anadromous fish stream that flows...

  11. Assessing the Feasibility of Creek Daylighting in San Francisco, Part I: A Synthesis of Lessons Learned from Existing Urban Daylighting Projects

    E-Print Network [OSTI]

    Smith, Brooke Ray

    2007-01-01T23:59:59.000Z

    and Leonardson 2004). Why Daylight? In San Francisco, creekof San Francisco to daylight historical urban creeks withincity governments to daylight urban creeks, with successful

  12. Solid Waste Energy Conversion Project, Reedy Creek Utilities Demonstration Plant: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1980-06-01T23:59:59.000Z

    The Solid Waste Energy Conversion (SWEC) facility proposed would produce high-temperature hot water from urban refuse and would also provide a demonstration pilot-plant for the proposed Transuranic Waste Treatment Facility (TWTF) in Idaho. The SWEC project would involve the construction of an incinerator facility capable of incinerating an average of 91 metric tons per day of municipal solid waste and generating high-temperature hot water using the off-gas heat. The facility is based on the Andco-Torrax slagging pyrolysis incineration process. The proposed action is described, as well as the existing environment at the site and identified potential environmental impacts. Coordination with federal, state, regional, or local plans and programs was examined, and no conflicts were identified. Programmatic alternatives to the proposed project were identified and their advantages, disadvantages, and environmental impacts were examined. It is found that the proposed action poses no significant environmental impacts, other than the short term effects of construction activities. (LEW)

  13. Categorical Excluslon DeterminatIon 11'orn1 Project Title: Bear Creek Road Deferred Maintenance Reduction Project (4550)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced. C o w l i t z C o .Fornl ProjectDeterminatIon 11'orn1 ......

  14. Camel Creek Minnamoolka

    E-Print Network [OSTI]

    Greenslade, Diana

    Creek Tr ebonne California Ly nd Hellhole Pac ksad dle Little Star River Ella M ic hael Davidson M eunga Echo Mid dle Leich hardt Blund er NobCreek Stony Barron Martin Deception Paddys Creek Broken River

  15. Alteration of the groundwater table due to construction of a floodplain bypass at Upper Pine Creek, Concord, California

    E-Print Network [OSTI]

    Williams, John L III

    2003-01-01T23:59:59.000Z

    66 Exploratory Boring 67 Natural Creek 72 Floodplain BypassChannel 78 Floodplain Bypass Channel 65 Natural Creek 69Natural Creek Table 2 Post-Project Groundwater Table Raw

  16. Microsoft Word - Trimble_Creek_Acquisition_CX.doc

    Broader source: Energy.gov (indexed) [DOE]

    funds to the Kalispel Tribe (Kalispel) for purchase of Trimble Creek (Doramus) Property Fish and Wildlife Project No.: 1992-061-00, Contract BPA-004991 Categorical Exclusion...

  17. Microsoft Word - CX_ThorneCreek_Final.doc

    Broader source: Energy.gov (indexed) [DOE]

    the Confederated Salish and Kootenai Tribes for purchase of the Thorne Creek Property. Fish and Wildlife Project No.: 2002-003-00, Contract CR-201269 Categorical Exclusion Applied...

  18. Perspectives on Dam Removal: York Creek Dam and the Water Framework Directive

    E-Print Network [OSTI]

    Lawrence, Justin E; Pollak, Josh D; Richmond, Sarah F

    2008-01-01T23:59:59.000Z

    Environmental Impact Report, Upper York Creek Ecosystem Restoration Project on April 8, 2008 to learn more about the history

  19. LLNL underground coal gasification project. Quarterly progress report, July-Sep 1980. [Hoe Creek and Gorgas, Alabama tests

    SciTech Connect (OSTI)

    Olness, D.U. (ed.)

    1980-10-14T23:59:59.000Z

    Laboratory studies of forward gasification through drilled holes in blocks of coal have continued. Such studies give insight into cavity growth mechanisms and particulate production. In addition to obtaining a qualitative comparison of the forward burn characteristics of two coals, we obtained information on the influence of bedding plane/cleat structure orientation on the early-time shape of the burn cavity in the Roland coal. We have improved our model of the coal drying rate during underground coal gasification (UCG) by adding refinements to the model. To aid in analyzing and predicting the performance of UCG tests, we have developed a simple gas-compositional model. When the model was tested against experimental data from the three Hoe Creek experiments, it was able to match very closely the observed gas compositions, energy fractions, and water influxes. This model can be used to make performance predictions consistent with the material and energy balance constraints of the underground system. A postburn coring and wireline-logging study is under way at the Hoe Creek No. 3 site to investigate the overall effect of the directionally-drilled, horizontal linking hole to better estimate the amount of coal gasified and the shape of the combustion front, and to provide additional information on subsurface deformation and thermal effects. The site reclamation work was completed, including the dismantling of all surface equipment and piping and the plugging and sealing of process and diagnostics wells. Final grading of the reclaimed land has been completed, and the area is ready for disk-seeding. Our survey of the UCG literature has continued with a review of the extensive tests at Gorgas, Alabama, carried on by the US Bureau of Mines from 1947 to 1959.

  20. Monitor and Protect Wigwam River Bull Trout for Koocanusa Reservoir : Summary of the Skookumchuck Creek Bull Trout Enumeration Project Final Report 2000-2002.

    SciTech Connect (OSTI)

    Baxter, Jeremy; Baxter, James S.

    2002-12-01T23:59:59.000Z

    This report summarizes the third and final year of a bull trout (Salvelinus confluentus) enumeration project on Skookumchuck Creek in southeastern British Columbia. The fence and traps were operated from September 6th to October 11th 2002 in order to enumerate post-spawning bull trout. During the study period a total of 309 bull trout were captured at the fence. In total, 16 fish of undetermined sex, 114 males and 179 females were processed at the fence. Length and weight data, as well as recapture information, were collected for these fish. An additional 41 bull trout were enumerated upstream of the fence by snorkeling prior to fence removal. Coupled with the fence count, the total bull trout enumerated during the project was 350 individuals. Several fish that were tagged in the lower Bull River were recaptured in 2002, as were repeat and alternate year spawners previously enumerated in past years at the fence. A total of 149 bull trout redds were enumerated on the ground in 2002, of which 143 were in the 3.0 km index section (river km 27.5-30.5) that has been surveyed over the past six years. The results of the three year project are summarized, and population characteristics are discussed.

  1. Case Study: Goose Creek CISD 

    E-Print Network [OSTI]

    White, D.

    2014-01-01T23:59:59.000Z

    GOOSE CREEK CISD FINANCIALS • $4,866,124 project • $600k annual savings • 5,954,383 kWh annual savings IMPROVEMENTS • Lighting and water efficiency, computer power management, HVAC, controls redesign case study McKinstry first worked with Goose... • $693,866 project • $87k annual savings • 682,228 kWh annual savings IMPROVEMENTS • HVAC, lighting and water efficiency, computer power management case study Lake Dallas ISD was interested in improving the energy efficiency and aging infrastructure...

  2. Redwood Creek, Marin County 2010 Monitoring Study of a Salmonid Habitat Stream Restoration Project: Seven-­?Year Post-­?Project Evaluation

    E-Print Network [OSTI]

    Crockett, Richard; Cundy, Fiona; Hanley, Colin

    2010-01-01T23:59:59.000Z

    Salmonid  Habitat  Stream  Restoration  Project:   Seven-­?227  |  Stream  and  River  Restoration   Term  Project  |  in  the  Stream  and   River   Restoration  class  

  3. DOE - Office of Legacy Management -- Lost Creek - WY 01

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTable ofArizonaBuffaloJohns HopkinsLaDivision -

  4. Squeezer Creek.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    critical habitat for bull trout and westslope cutthroat trout in a reach of Squeezer Creek in Lake County. Squeezer Creek provides high-quality cold water habitat for native fi...

  5. Panther Creek, Idaho, Habitat Rehabilitation, Final Report.

    SciTech Connect (OSTI)

    Reiser, Dudley W.

    1986-01-01T23:59:59.000Z

    The purpose of the project was to achieve full chinook salmon and steelhead trout production in the Panther Creek, Idaho, basin. Plans were developed to eliminate the sources of toxic effluent entering Panther Creek. Operation of a cobalt-copper mine since the 1930's has resulted in acid, metal-bearing drainage entering the watershed from underground workings and tailings piles. The report discusses plans for eliminating and/or treating the effluent to rehabilitate the water quality of Panther Creek and allow the reestablishment of salmon and trout spawning runs. (ACR)

  6. Lost films chronicle dawn of hydroelectric power in the Northwest

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lost-films-chronicle-dawn-of-hydroelectric-power-in-the-Northwest Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects &...

  7. Microsoft Word - Spring Creek Final Draft CX 7-15-2013.docx

    Broader source: Energy.gov (indexed) [DOE]

    Cecilia Brown Project Manager - KEWM-4 Proposed Action: Spring Creek Property funding Fish and Wildlife Project No. and Contract No.: 2002-003-00, BPA-007168 Categorical...

  8. Microsoft Word - CX_PerryCreek_4.29.11.doc

    Broader source: Energy.gov (indexed) [DOE]

    Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Montana Fish, Wildlife and Parks for purchase of the Perry Creek Property. Fish and Wildlife Project...

  9. Early post-restoration re-vegetation performance and critical social and institutional factors in a landowner-involved restoration project on lower Wooden Valley Creek, Napa County, CA

    E-Print Network [OSTI]

    Levy, Morgan; Post, Charles

    2010-01-01T23:59:59.000Z

    of the lower Wooden Valley Creek behind McQueeny’s house (Conditions in the Suisun Creek Watershed (Napa/Solano Co. ).Property - South Suisun Creek Watershed Program, Riparian

  10. EA-1898: Southwest Regional Partnership on Carbon Sequestration Phase III Gordon Creek Project near Price, Utah in Carbon County

    Broader source: Energy.gov [DOE]

    This EA will evaluate the environmental impacts of a proposal for Phase III field deployment to demonstrate commercial-scale carbon storage technologies.This Phase III large-scale carbon dioxide injection project will combine science and engineering from many disciplines to successfully sequester and monitor carbon storage. [NOTE: This EA has been cancelled].

  11. Buck CreekWatershed Protection Plan

    E-Print Network [OSTI]

    State Soil and Water Conservation Board (Project 06-11) U.S. Environmental Protection Agency Developed Conservation Board (Project 06-11) U.S. Environmental Protection Agency Investigating Agencies: Texas A&M Agri the Texas State Soil and Water Conservation Board and U.S. Environmental Protection Agency. Buck Creek

  12. Thompson Creek, Poway, California THOMPSON CREEK GROUNDWATER SUSTAINABILITY STUDY

    E-Print Network [OSTI]

    Ponce, V. Miguel

    Thompson Creek, Poway, California THOMPSON CREEK GROUNDWATER SUSTAINABILITY STUDY Victor M. Ponce 07 May 2012 #12;EXECUTIVE SUMMARY The groundwater resources of Thompson Creek, in Poway, California. Significantly, a spring in Lower Thompson Creek, documented by USGS in the 1980s, is no longer there. Aquifer

  13. Spooner creek restoration and fish ladder

    E-Print Network [OSTI]

    Moore, Tom

    2003-01-01T23:59:59.000Z

    SPOONER CREEK RESTORATION AND FISH LADDER Tom Moore (Phone:847-3132 Abstract Spooner Creek is a dendritic second orderflows into Cattaraugus Creek, a tributary of Lake Erie.

  14. Biodiversity Corridors in Alamo Creek, Vacaville, California

    E-Print Network [OSTI]

    Urrechaga, Jose; Wei, Xinghan

    2012-01-01T23:59:59.000Z

    Horn, Oct, 2003 4.   Alamo Creek final report, 2005 5.  Biodiversity Corridors in Alamo Creek, Vacaville, Californiabiodiversity corridors along the creek in the city and uses

  15. Daylighting Islais Creek : a feasibility study

    E-Print Network [OSTI]

    Jencks, Rosey; Leonardson, Rebecca

    2004-01-01T23:59:59.000Z

    for daylighting the creek and other green infrastructure.Daylighting Islais Creek for stormwater conveyance wouldGlen Park Cayuga Islais Creek Runoff Elev. Slope coeff.

  16. Landowners lead successful Buck Creek restoration

    E-Print Network [OSTI]

    Boutwell, Kathryn S.

    2012-01-01T23:59:59.000Z

    of the watershed, according to Dr. John Sij, retired agronomist and former project leader at the Vernon center. ?#31;is e#27;ort veri#25;ed that bacteria levels periodi- cally reach problematic levels,? he said. Landowners lead successful Buck Creek...

  17. Microsoft Word - JockoSpringCreek_Scott_Acquisition_CX_Final...

    Broader source: Energy.gov (indexed) [DOE]

    purchase of Jocko Spring Creek Property. Fish and Wildlife Project No.: 2002-003-00, Contract BPA-44646 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):...

  18. Microsoft Word - MissionCreek_Kingston_Acquisition_CX_final.doc

    Broader source: Energy.gov (indexed) [DOE]

    purchase of the Mission Creek Property. Fish and Wildlife Project No.: 2002-003-00, Contract BPA-44646 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25...

  19. Microsoft Word - CX_PistolCreek_Final.doc

    Broader source: Energy.gov (indexed) [DOE]

    the Confederated Salish and Kootenai Tribes for purchase of the Pistol Creek Property. Fish and Wildlife Project No.: 2002-003-00 Categorical Exclusion Applied (from Subpart D, 10...

  20. Camas Creek.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    would connect two separate protect- ed areas owned by the Idaho Department of Fish and Game, creating a contiguous wildlife area of almost 5,000 acres. Camas Creek and...

  1. CRADIT FARM DRIVE CREEK DRIVE

    E-Print Network [OSTI]

    Davis, H. Floyd

    CRADIT FARM DRIVE THURSTON CREEK DRIVE CENTRALAVENUE ENUE UNIVERSITY AVENUE EASTAVENUE FOREST HOME CREEK DRIVE CENTRALAVENUE ENUE UNIVERSITY AVENUE EASTAVENUE FOREST HOME DRIVE HIGHLAND ROBERTS PLACE GARDEN DEANS ARTS QUAD RAWLINGS GREEN R. URIS GARDEN AG QUAD BIOLOGY BEEBE LAK FALL CREEK Clark Hall Olin

  2. Historical narratives of Big Chico Creek Watershed Alliance and Butte Creek Watershed Conservancy

    E-Print Network [OSTI]

    King, Mary Ann; Matz, Mike

    2003-01-01T23:59:59.000Z

    Passage on Upper Butte Creek: An Assessment of the NaturalHistorical Narratives of Big Chico Creek Watershed Allianceand Butte Creek Watershed Conservancy Mary Ann King and Mike

  3. Codornices Creek Corridor: Land Use Regulation, Creek Restoration, and their Impacts on the Residents’ Perceptions

    E-Print Network [OSTI]

    Stokenberga, Aiga; Sen, Arijit

    2013-01-01T23:59:59.000Z

    Restoration on Codornices Creek. Restoration of Rivers andHarper Colophon. Cordonices Creek Corridor Haggerty, L.Associates. 2003. Codornices Creek Watershed Restoration

  4. Manufacturing Battle Creek

    E-Print Network [OSTI]

    de Doncker, Elise

    to the manufacturing sector in Western Michigan. In addition to serving as director of the MRC, Dr. Patten is alsoManufacturing Research Center Kalamazoo Battle Creek The College of Engineering and Applied Sciences The Supporting manufacturing industries by providing opportunities for collaboration with faculty

  5. Hydrology and channel form of an urban creek : Rheem Creek in the context of restoration efforts

    E-Print Network [OSTI]

    Balazs, Carolina; Lang, Micah

    2005-01-01T23:59:59.000Z

    of Reach 3 Hydrology and Channel Form of an Urban Creek:Rheem Creek in the Context of Restoration Efforts CarolinaChannel Form of an Urban Creek: Rheem Creek in the Context

  6. sanfranciscoestuaryinstitute//finalreport Coyote Creek/Coyote Valley

    E-Print Network [OSTI]

    Laguna Seca Coyote Creek Fisher Cr. #12;III - 49 sanfranciscoestuaryinstitute//finalreport Map 4B-ca.1800, green; project boundary, white (scale 1:40,000; 1"~3300'; 1 square inch ~250 acres; original photographs, with historicaL Landscape features overLay. Historical fluvial features in blue; other features, green; project

  7. Channel incision in Rodeo Creek, Marin County

    E-Print Network [OSTI]

    Bass, Phoebe; Choy, Min

    2004-01-01T23:59:59.000Z

    on the Wetlands of Rodeo Creek in the Marin Headlands,channel. Cross Section 3 Rodeo Creek is 5 ft wide at Cross1.55 ft deep. Here, Rodeo Creek is a small channel running

  8. Observation of induced fractures intercepted by mining in the Warrior Basin, Alabama. Topical report. Rock Creek methane from multiple coal seams completion project

    SciTech Connect (OSTI)

    Steidl, P.F.

    1991-12-01T23:59:59.000Z

    This report summarizes research and inspection of induced fractures that have been intercepted by mining. Induced fractures from 13 wells intercepted by mining were inspected at the Jim Walter Resources' (JWR) No. 4 and 5 Mines in Tuscaloosa County, and the Oak Grove Mine in Jefferson County, Alabama. In this area the Mary Lee and Blue Creek coalbeds average 1.3 ft and 4 to 5.5 ft, respectively at depths of about 2,000 ft at the JWR mines and 1,000 ft in the Oak Grove Mine. These seams are usually separated by 2 to 10 ft of rock parting. The wells were completed open hole from 1982 to 1986. Hydraulic fracture treatments were used to stimulate production. Some expected results include: in general, the fractures followed the coal face cleat direction; they were vertical, and were sandpacked close to the wall. Other observations include the following: (1) most of the fractures and proppant were present in the parting and roof rock, (2) results were similar in the JWR and Oak Grove Mines even though there is 1,000 ft less overburden at the Oake Grove Mine, and (3) no horizontal fractures were observed in the study; though other stimulations have propagated horizontal fractures at Oak Grove.

  9. Willow Creek - Sept 2009.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Willow Creek land acquisition protects habitat in Willamette Valley The Bonneville Power Administration is working with The Nature Conservancy to acquire and manage a 10-acre...

  10. Assessing the Feasibility of Creek Daylighting in San Francisco, Part I: A Synthesis of Lessons Learned from Existing Urban Daylighting Projects

    E-Print Network [OSTI]

    Smith, Brooke Ray

    2007-01-01T23:59:59.000Z

    evaluation of an urban stream restoration project (Baxtercan be equated with stream restoration is debatable. Someprofound form of stream restoration, recreating a surface

  11. EA-1988: NFSC (Northwest Fisheries Science Center) Earthen Drainage Channel, Burley Creek Hatchery, Port Orchard, Washington

    Broader source: Energy.gov [DOE]

    The National Oceanic and Atmospheric Administration (NOAA), with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of a NOAA Northwest Fisheries Science Center proposal to construct an earthen drainage channel at its Burley Creek Hatchery in Kitsap County, Washington. The project would facilitate increased discharge of treated effluent from the hatchery facility into the adjacent Burley Creek. BPA’s proposal is to fund the project. The project website is http://efw.bpa.gov/environmental_services/Document_Library/Burley_Creek/.

  12. Road-crossing restoration on alluvial creeks in the Klamath National Forest, California

    E-Print Network [OSTI]

    Lawrence, Justin E

    2008-01-01T23:59:59.000Z

    National Forest of northern California. Upper Elk CreekBishop CreekStanza Creek Upper Boulder Creek Lower Boulder Creek Cecil

  13. Idaho_ColdwaterCreek

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh School footballHydrogenIT | NationalMentoringWind PowerColdwater Creek

  14. Scotch Creek Wildlife Area 2007-2008 Annual Report.

    SciTech Connect (OSTI)

    Olson, Jim [Washington Department of Fish and Wildlife

    2008-11-03T23:59:59.000Z

    The Scotch Creek Wildlife Area is a complex of 6 separate management units located in Okanogan County in North-central Washington State. The project is located within the Columbia Cascade Province (Okanogan sub-basin) and partially addresses adverse impacts caused by the construction of Chief Joseph and Grand Coulee hydroelectric dams. With the acquisition of the Eder unit in 2007, the total size of the wildlife area is now 19,860 acres. The Scotch Creek Wildlife Area was approved as a wildlife mitigation project in 1996 and habitat enhancement efforts to meet mitigation objectives have been underway since the spring of 1997 on Scotch Creek. Continuing efforts to monitor the threatened Sharp-tailed grouse population on the Scotch Creek unit are encouraging. The past two spring seasons were unseasonably cold and wet, a dangerous time for the young of the year. This past spring, Scotch Creek had a cold snap with snow on June 10th, a critical period for young chicks just hatched. Still, adult numbers on the leks have remained stable the past two years. Maintenance of BPA funded enhancements is necessary to protect and enhance shrub-steppe and to recover and sustain populations of Sharp-tailed grouse and other obligate species.

  15. Restoration With Reference: Rediscovering Cerrito Creek in Blake Garden

    E-Print Network [OSTI]

    Ludy, Jessica; Podolak, Kristen

    2007-01-01T23:59:59.000Z

    W10301. Figure 1: Historical Map of Cerrito Creek (Friendsof Five Creeks). Figure 2:and watershed contribution to creek reach in Blake garden

  16. Optimal Nonpoint Source Monitoring: An Application to Redwood Creek

    E-Print Network [OSTI]

    Howitt, Richard E

    2000-01-01T23:59:59.000Z

    Application to Redwood Creek By Richard E. Howitt Departmentloading data for Redwood Creek, which flows into and throughcontrol model for Redwood Creek. We simulate the sediment

  17. Archaeological Investigations in Northern San Diego County, California: Frey Creek

    E-Print Network [OSTI]

    True, D. L; Waugh, G.

    1981-01-01T23:59:59.000Z

    and material. FREY CREEK Fig. 14. Artifacts recovered fromCounty, California: Frey Creek D. L. TRUE G. WAUGH S URVEYSand material. FREY CREEK Table 11 ARTIFACT DISTRIBUTION,

  18. Microsoft Word - CX-SpringCreek-WineCountry-TowerRelocationFY13...

    Broader source: Energy.gov (indexed) [DOE]

    November 29, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Justin Estes Project Manager - TELM-TPP-3 Proposed Action: Spring Creek - Wine County No. 1...

  19. Assessing the Feasibility of Creek Daylighting in San Francisco, Part II: A Preliminary Analysis of Yosemite Creek

    E-Print Network [OSTI]

    Smith, Brooke Ray

    2007-01-01T23:59:59.000Z

    Lucas. 2006. Islais Creek reinterpreted: An exploration ofwould be triggered? If the creek conveys stormwater runoff,2004. Daylighting Islais Creek: a feasibility study.

  20. Evidence of Streamflow and Sediment Effects on Juvenile Coho and Benthic Macroinvertebrates of Lagunitas Creek and San Geronimo Creek, Marin County, California

    E-Print Network [OSTI]

    Ball, Joanie; Diver, Sibyl; Hwan, Jason

    2009-01-01T23:59:59.000Z

    at Big Bend Upstream Trib at Big Bend Devil's Gulch CreekDeadman's Creek Left Bank Trib from GroupWildcat & Pioneer Trail Creek Barnabe Creek Smaller Barnabe

  1. Bacteria TMDL Projects 

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of the projects are listed below. ? Peach CreekWater Quality Improvement Project ? Monitoring and Educational Programs Focused on Bacteria and Nutrient Runoff on Dairy Operations in the LeonWatershed ? Development of the Plum CreekWPP ? Impact of Proper... Star Healthy Streams * ? Environmental Management of Grazing Lands * *TWRI-managed projects More information on the initiative is available at www.tsswcb.state.tx.us/managementprogram/ initiatives/bacteria. Bacteria Projects Across the State...

  2. Big Bayou Creek and Little Bayou Creek Watershed Monitoring Program

    SciTech Connect (OSTI)

    Kszos, L.A.; Peterson, M.J.; Ryon; Smith, J.G.

    1999-03-01T23:59:59.000Z

    Biological monitoring of Little Bayou and Big Bayou creeks, which border the Paducah Site, has been conducted since 1987. Biological monitoring was conducted by University of Kentucky from 1987 to 1991 and by staff of the Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) from 1991 through March 1999. In March 1998, renewed Kentucky Pollutant Discharge Elimination System (KPDES) permits were issued to the US Department of Energy (DOE) and US Enrichment Corporation. The renewed DOE permit requires that a watershed monitoring program be developed for the Paducah Site within 90 days of the effective date of the renewed permit. This plan outlines the sampling and analysis that will be conducted for the watershed monitoring program. The objectives of the watershed monitoring are to (1) determine whether discharges from the Paducah Site and the Solid Waste Management Units (SWMUs) associated with the Paducah Site are adversely affecting instream fauna, (2) assess the ecological health of Little Bayou and Big Bayou creeks, (3) assess the degree to which abatement actions ecologically benefit Big Bayou Creek and Little Bayou Creek, (4) provide guidance for remediation, (5) provide an evaluation of changes in potential human health concerns, and (6) provide data which could be used to assess the impact of inadvertent spills or fish kill. According to the cleanup will result in these watersheds [Big Bayou and Little Bayou creeks] achieving compliance with the applicable water quality criteria.

  3. Evaluating the Effects of Vortex Rock Weir Stability on Physical Complexity: Penitencia and Wildcat Creeks

    E-Print Network [OSTI]

    Corwin, Emily; Jagt, Katie; Neary, Leigh

    2007-01-01T23:59:59.000Z

    curves for Wildcat Creek. Evaluating the effects of vortexmap of Penitencia Creek………………………………………………………………10 Figure 6.Penitencia Creek site location………………………………………………………………….10

  4. FIELD EVALUATION OF THE MYRTLE CREEK ADVANCED

    E-Print Network [OSTI]

    Bertini, Robert L.

    FIELD EVALUATION OF THE MYRTLE CREEK ADVANCED CURVE WARNING SYSTEM Final Report SPR 352 #12;#12;FIELD EVALUATION OF THE MYRTLE CREEK ADVANCED CURVE WARNING SYSTEM SPR 352 Final Report by Robert L's Catalog No. 5. Report Date June 2006 4. Title and Subtitle Field Evaluation of the Myrtle Creek Advanced

  5. Water Conservation Study for Manastash Creek Water Users, Kittias County, Washington, Final Report 2002.

    SciTech Connect (OSTI)

    Montgomery Watson Harza (Firm)

    2002-12-31T23:59:59.000Z

    Manastash Creek is tributary of the Yakima River and is located southwest and across the Yakima River from the City of Ellensburg. The creek drains mountainous terrain that ranges in elevation from 2,000 feet to over 5,500 feet and is primarily snowmelt fed, with largest flows occurring in spring and early summer. The creek flows through a narrow canyon until reaching a large, open plain that slopes gently toward the Yakima River and enters the main stem of the Yakima River at river mile 154.5. This area, formed by the alluvial fan of the Creek as it leaves the canyon, is the subject of this study. The area is presently dominated by irrigated agriculture, but development pressures are evident as Ellensburg grows and develops as an urban center. Since the mid to late nineteenth century when irrigated agriculture was established in a significant manner in the Yakima River Basin, Manastash Creek has been used to supply irrigation water for farming in the area. Adjudicated water rights dating back to 1871 for 4,465 acres adjacent to Manastash Creek allow appropriation of up to 26,273 acre-feet of creek water for agricultural irrigation and stock water. The diversion of water from Manastash Creek for irrigation has created two main problems for fisheries. They are low flows or dewatered reaches of Manastash Creek and fish passage barriers at the irrigation diversion dams. The primary goal of this study, as expressed by Yakama Nation and BPA, is to reestablish safe access in tributaries of the Yakima River by removing physical barriers and unscreened diversions and by adding instream flow where needed for fisheries. The goal expressed by irrigators who would be affected by these projects is to support sustainable and profitable agricultural use of land that currently uses Manastash Creek water for irrigation. This study provides preliminary costs and recommendations for a range of alternative projects that will partially or fully meet the goal of establishing safe access for fisheries in Manastash Creek by reducing or eliminating diversions and eliminating fish passage barriers. Further study and design will be necessary to more fully develop the alternatives, evaluate their environmental benefits and impacts and determine the effect on Manastash Creek water users. Those studies will be needed to determine which alternative has the best combination of benefits and costs, and meets the goal of the Manastash Creek water users.

  6. Big Canyon Creek Ecological Restoration Strategy.

    SciTech Connect (OSTI)

    Rasmussen, Lynn; Richardson, Shannon

    2007-10-01T23:59:59.000Z

    He-yey, Nez Perce for steelhead or rainbow trout (Oncorhynchus mykiss), are a culturally and ecologically significant resource within the Big Canyon Creek watershed; they are also part of the federally listed Snake River Basin Steelhead DPS. The majority of the Big Canyon Creek drainage is considered critical habitat for that DPS as well as for the federally listed Snake River fall chinook (Oncorhynchus tshawytscha) ESU. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resources Management-Watershed (Tribe), in an effort to support the continued existence of these and other aquatic species, have developed this document to direct funding toward priority restoration projects in priority areas for the Big Canyon Creek watershed. In order to achieve this, the District and the Tribe: (1) Developed a working group and technical team composed of managers from a variety of stakeholders within the basin; (2) Established geographically distinct sub-watershed areas called Assessment Units (AUs); (3) Created a prioritization framework for the AUs and prioritized them; and (4) Developed treatment strategies to utilize within the prioritized AUs. Assessment Units were delineated by significant shifts in sampled juvenile O. mykiss (steelhead/rainbow trout) densities, which were found to fall at fish passage barriers. The prioritization framework considered four aspects critical to determining the relative importance of performing restoration in a certain area: density of critical fish species, physical condition of the AU, water quantity, and water quality. It was established, through vigorous data analysis within these four areas, that the geographic priority areas for restoration within the Big Canyon Creek watershed are Big Canyon Creek from stream km 45.5 to the headwaters, Little Canyon from km 15 to 30, the mainstem corridors of Big Canyon (mouth to 7km) and Little Canyon (mouth to 7km). The District and the Tribe then used data collected from the District's stream assessment and inventory, utilizing the Stream Visual Assessment Protocol (SVAP), to determine treatment necessary to bring 90% of reaches ranked Poor or Fair through the SVAP up to good or excellent. In 10 year's time, all reaches that were previously evaluated with SVAP will be reevaluated to determine progress and to adapt methods for continued success. Over 400 miles of stream need treatment in order to meet identified restoration goals. Treatments include practices which result in riparian habitat improvements, nutrient reductions, channel condition improvements, fish habitat improvements, invasive species control, water withdrawal reductions, improved hydrologic alterations, upland sediment reductions, and passage barrier removal. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resource Management Watershed Division (Tribe) developed this document to guide restoration activities within the Big Canyon Creek watershed for the period of 2008-2018. This plan was created to demonstrate the ongoing need and potential for anadromous fish habitat restoration within the watershed and to ensure continued implementation of restoration actions and activities. It was developed not only to guide the District and the Tribe, but also to encourage cooperation among all stakeholders, including landowners, government agencies, private organizations, tribal governments, and elected officials. Through sharing information, skills, and resources in an active, cooperative relationships, all concerned parties will have the opportunity to join together to strengthen and maintain a sustainable natural resource base for present and future generations within the watershed. The primary goal of the strategy is to address aquatic habitat restoration needs on a watershed level for resident and anadromous fish species, promoting quality habitat within a self-sustaining watershed. Seven objectives have been developed to support this goal: (1) Identify factors limiting quality

  7. Restoration Potential of a Mining-Impacted Urban Stream: Horseshoe Branch of Lion Creek, Oakland, CA

    E-Print Network [OSTI]

    Hackenjos, Bethany; Woelfle-Erskine, Cleo; Wood, Jacob

    2010-01-01T23:59:59.000Z

    Level Biotic Index Score, 0= low, 10= high Horseshoe CreekWater Quality in an Urban Creek Watershed, Oakland, CA. AGUHydraulics. 2010. Codornices Creek Gage: Codornices Creek,

  8. Trout Creek, Oregon Watershed Assessment; Findings, Condition Evaluation and Action Opportunities, 2002 Technical Report.

    SciTech Connect (OSTI)

    Runyon, John

    2002-08-01T23:59:59.000Z

    The purpose of the assessment is to characterize historical and current watershed conditions in the Trout Creek Watershed. Information from the assessment is used to evaluate opportunities for improvements in watershed conditions, with particular reference to improvements in the aquatic environment. Existing information was used, to the extent practicable, to complete this work. The assessment will aid the Trout Creek Watershed Council in identifying opportunities and priorities for watershed restoration projects.

  9. Canasawacta Creek Project: Chenango County, New York

    E-Print Network [OSTI]

    O’Reilly, Mary; MacEwan, David; Greco, Brandon; Nelson, Debra; Long, George; Rowen, John

    2007-01-01T23:59:59.000Z

    the Federal Interagency Stream Restoration Working Group (natural habitat, stream restoration, land use and communityby the Federal Interagency Stream Restoration Working Group,

  10. Canasawacta Creek Project: Chenango County, New York

    E-Print Network [OSTI]

    O’Reilly, Mary; MacEwan, David; Greco, Brandon; Nelson, Debra; Long, George; Rowen, John

    2007-01-01T23:59:59.000Z

    State Department of Environmental Conservation (NYSDEC), theDepartment of Environmental Conservation (NYSDEC) • ChenangoDepartment of Environmental Conservation, statewide energy

  11. Willow Creek Wildlife Mitigation- Project Final Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    1980 a s outlined by the Northwest Power Planning Council's 1994.Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOEEA-1023)...

  12. Edwards Creek Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOEHazel Crest, Illinois:Edinburgh University aka WaveKansas: EnergyGeothermal

  13. Eva Creek Wind Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualPropertyd8c-a9ae-f8521cbb8489 NoEurope BV Jump to: navigation, search Name: Eurus Energy

  14. Downhole material injector for lost circulation control

    DOE Patents [OSTI]

    Glowka, D.A.

    1994-09-06T23:59:59.000Z

    Apparatus and method are disclosed for simultaneously and separately emplacing two streams of different materials through a drill string in a borehole to a downhole location for lost circulation control. The two streams are mixed outside the drill string at the desired downhole location and harden only after mixing for control of a lost circulation zone. 6 figs.

  15. Sudan and the Lost Girls: Another Step

    E-Print Network [OSTI]

    Fraden, Seth

    Sudan and the Lost Girls: Another Step in the Journey-- Sudan to America Presented by Brandeis Journalism-- Panel discussion on "Sudan and the Lost Girls: Another Step in the Journey," present- ed Educational Fund. The participants will discuss life in South Sudan during the mass exodus of youth from

  16. Downhole material injector for lost circulation control

    DOE Patents [OSTI]

    Glowka, D.A.

    1991-01-01T23:59:59.000Z

    This invention is comprised of an apparatus and method for simultaneously and separately emplacing two streams of different materials through a drillstring in a borehole to a downhole location for lost circulation control. The two streams are mixed outside the drillstring at the desired downhole location and harden only after mixing for control of a lost circulation zone.

  17. EA-1978: Sand Creek Winds, McCone County, Montana

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) is preparing an EA to analyze the potential environmental impacts of the proposed Sand Creek Winds Project, a 75-MW wind farm between the towns of Circle and Wolf Point in McCone County, Montana. The proposed wind farm would interconnect to Western’s existing Wolf Point to Circle 115-kV transmission line approximately 18 miles north of Wolf Point.

  18. Abstract At the time of this study Fossil Creek was being considered as a site for the restoration

    E-Print Network [OSTI]

    . This study was conducted prior to a hydroelectric dam decommissioning project in Fossil Creek where full limitation Ă? Phosphorous Ă? Nitrogen Ă? Invertebrate Ă? Dam Ă? Hydroelectric Ă? Native fish Ă? Food base

  19. TSSWCB Bacteria-Related Projects 

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of the projects are listed below. ? Peach CreekWater Quality Improvement Project ? Monitoring and Educational Programs Focused on Bacteria and Nutrient Runoff on Dairy Operations in the LeonWatershed ? Development of the Plum CreekWPP ? Impact of Proper... Star Healthy Streams * ? Environmental Management of Grazing Lands * *TWRI-managed projects More information on the initiative is available at www.tsswcb.state.tx.us/managementprogram/ initiatives/bacteria. Bacteria Projects Across the State...

  20. Codornices Creek Corridor: Land Use Regulation, Creek Restoration, and their Impacts on the Residents’ Perceptions

    E-Print Network [OSTI]

    Stokenberga, Aiga; Sen, Arijit

    2013-01-01T23:59:59.000Z

    and perception of biodiversity and ecology is their activecommunity and perception of area ecology: individual-levelOutcomes 2 & 3: Perception of Area Ecology & Creek’s Role in

  1. A Statistical Model for Lost Language Decipherment

    E-Print Network [OSTI]

    Snyder, Benjamin

    In this paper we propose a method for the automatic decipherment of lost langauges. Given a non-parallel corpus in a known related language, our model produces both alphabetic mappings and translations of words into their ...

  2. Brood Year 2004: Johnson Creek Chinook Salmon Supplementation Report, June 2004 through March 2006.

    SciTech Connect (OSTI)

    Gebhards, John S.; Hill, Robert; Daniel, Mitch [Nez Perce Tribe

    2009-02-19T23:59:59.000Z

    The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River spring/summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek to spawn through artificial propagation. This was the sixth season of adult chinook broodstock collection in Johnson Creek following collections in 1998, 2000, 2001, 2002, and 2003. Weir installation was completed on June 21, 2004 with the first chinook captured on June 22, 2004 and the last fish captured on September 6, 2004. The weir was removed on September 18, 2004. A total of 338 adult chinook, including jacks, were captured during the season. Of these, 211 were of natural origin, 111 were hatchery origin Johnson Creek supplementation fish, and 16 were adipose fin clipped fish from other hatchery operations and therefore strays into Johnson Creek. Over the course of the run, 57 natural origin Johnson Creek adult chinook were retained for broodstock, transported to the South Fork Salmon River adult holding and spawning facility and held until spawned. The remaining natural origin Johnson Creek fish along with all the Johnson Creek supplementation fish were released upstream of the weir to spawn naturally. Twenty-seven Johnson Creek females were artificially spawned with 25 Johnson Creek males. Four females were diagnosed with high bacterial kidney disease levels resulting in their eggs being culled. The 27 females produced 116,598 green eggs, 16,531 green eggs were culled, with an average eye-up rate of 90.6% resulting in 90,647 eyed eggs. Juvenile fish were reared indoors at the McCall Fish Hatchery until November 2005 and then transferred to the outdoor rearing facilities during the Visual Implant Elastomer tagging operation. These fish continued rearing in the outdoor collection basin until release in March 2006. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags. In addition 12,056 of the smolts released were also tagged with Passive Integrated Transponder tags. Hand counts provided by marking crews were used to amend the number of juvenile salmon released from the original egg count. A total of 90,450 smolts were released directly into Johnson Creek on March 13 through 15, 2006.

  3. Channel response to Dam Removal, Clear Creek, California

    E-Print Network [OSTI]

    Miller, Peter; Vizcaino, Pilar

    2004-01-01T23:59:59.000Z

    to Dam Removal, Clear Creek, California Peter Miller and9, 2004 Abstract Clear Creek drains 720 km 2 , joining the2002) Saeltzer Dam on Clear Creek was a good candidate for

  4. Gully incision in Gerbode Creek, Rodeo Lagoon watershed

    E-Print Network [OSTI]

    Costantino, Raymond L

    2003-01-01T23:59:59.000Z

    and a bridge over Gerbode Creek's main stem. Remnants of thefound on the banks of the creek. North Tributary 1 GerbodeD Distance (ft) GERBODE CREEK: NORTHERN TRIBUTARY 2 Depth (

  5. The Copper Creek Clovis Point from Hells Canyon, Northeastern Oregon

    E-Print Network [OSTI]

    Reid, Kenneth C.; Root, Matthew J.; Hughes, Richard E.

    2008-01-01T23:59:59.000Z

    2008) | pp. 75-84 The Copper Creek Clovis Point from HellsSnake River to the Copper Creek point discovery location.5 cm Figure 4. The Copper Creek Clovis point (tick marks

  6. Lagrangian Sampling of Wastewater Treatment Plant Effluent in Boulder Creek, Colorado, and Fourmile Creek,

    E-Print Network [OSTI]

    Lagrangian Sampling of Wastewater Treatment Plant Effluent in Boulder Creek, Colorado, and Fourmile of wastewater treatment plant effluent in Boulder Creek, Colorado, and Fourmile Creek, Iowa, during the summer........................................................................................................................................................... 5 Field Measurements, Nutrients, Carbon, Major Ions, Trace Elements, and Biological Components

  7. Kansas Nuclear Profile - Wolf Creek Generating Station

    U.S. Energy Information Administration (EIA) Indexed Site

    April 2012" "Next Release Date: February 2013" "Wolf Creek Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor...

  8. New Jersey Nuclear Profile - Oyster Creek

    U.S. Energy Information Administration (EIA) Indexed Site

    Oyster Creek" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

  9. Omak Creek acquisition protects endangered salmonid habitat ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to protect habitat for endangered salmon and steelhead along Omak Creek in Okano- gan County. This acquisition would protect spawning, rearing and migratory habitat of...

  10. DOE - Office of Legacy Management -- Hoe Creek Underground Coal...

    Office of Legacy Management (LM)

    Hoe Creek Underground Coal Gasification Site - 045 FUSRAP Considered Sites Site: Hoe Creek Underground Coal Gasification Site (045) Designated Name: Alternate Name: Location:...

  11. Cougar Creek land acquisition Fact Sheet.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of wildlife habitat along Cougar Creek The Bonneville Power Administration proposes to fund the acquisition of wildlife mitigation lands in the Cougar Creek watershed in Shoshone...

  12. allens creek nuclear: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Materials Science Websites Summary: International Workshop on Interfaces at Bear Creek October 20 - 24, 2009 Bear Creek Mountain Resort of Community and Economic Development...

  13. The Lyons Creek boat remains

    E-Print Network [OSTI]

    Neyland, Robert Stephen

    1990-01-01T23:59:59.000Z

    transportation. Only a few other American colonial-era small craft have as yet been studied, some of which are the Brown's P*y 1 'S*thC1', thEm'Lk Champlain, the Hart's Cove wzeck in New Hampshire, the J R' b t 1 V' g' ', d tl* ~Sk Massachusetts (Albright..., beginning at its mouth, is 9ust over a mile, while the drainage system extends for several miles east of Maryland Route 4. Near the mouth of Lyons Creek, the northern shore is a wetland that is reduced to a grassy mudflat at ebb tide. Only a slender...

  14. Rehabilitate Newsome Creek Watershed, 2007-2008 Annual Report.

    SciTech Connect (OSTI)

    Bransford, Stephanie [Nez Perce Tribe Fisheries/Watershed Program

    2009-05-01T23:59:59.000Z

    The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridgetop approach. The Nez Perce Tribe (NPT) and the Nez Perce National Forest (NPNF) have formed a partnership in completing watershed restoration activities, and through this partnership more work is accomplished by sharing funding and resources in our effort. The Nez Perce Tribe began watershed restoration projects within the Newsome Creek watershed of the South Fork Clearwater River in 1997. Progress has been made in restoring the watershed through road decommissioning and culvert replacement. Starting in FY 2001 and continuing into the present, a major stream restoration effort on the mainstem of Newsome Creek has been pursued. From completing a watershed assessment to a feasibility study of 4 miles of mainstem rehabilitation to carrying that forward into NEPA and a final design, we will begin the effort of restoring the mainstem channel of Newsome Creek to provide spawning and rearing habitat for anadromous and resident fish species. Roads have been surveyed and prioritized for removal or improvement as well as culverts being prioritized for replacement to accommodate fish passage throughout the watershed.

  15. Early post-restoration re-vegetation performance and critical social and institutional factors in a landowner-involved restoration project on lower Wooden Valley Creek, Napa County, CA

    E-Print Network [OSTI]

    Levy, Morgan; Post, Charles

    2010-01-01T23:59:59.000Z

    Micheli. “Forum: Evaluating Stream Restoration Projects. ”adaptive management of small stream restoration projects.Current efforts in stream restoration emphasize the

  16. Unaccounted-for gas; Lost or just misplaced

    SciTech Connect (OSTI)

    Grinstead, J.R.; Cowgill, R.M. (Pacific Gas and Electric Co., San Francisco, CA (US))

    1991-05-01T23:59:59.000Z

    Lost and unaccounted for gas is the term used by the gas industry to define the difference between the quantity of gas received into and delivered out of a system over a specific period of time. For Pacific Gas and Electric Co. (PG and E) the gas is not really lost, just misplaced. The proper term is unaccounted for gas (UAF). PG and E has conducted a comprehensive research project to evaluate UAF on its gas transmission and distribution systems. This project was cofunded by the Gas Research Institute (GRI). GRI's involvement was directed, by Kirin Kothari, Manager of Metering and Operations Research. While PG and E's work began as a reaction to state regulatory agency concerns, this work will be invaluable to the rest of the gas industry in that it provides results and, more importantly, methodologies for the gas utility industry to use in taking the lead with regulatory agencies and with the energy industry regarding: Prudence of the UAF aspects of operations, Equity of allocation of UAF costs to various customer classes, Support for the position that the gas industry's contribution to the country's unburned methane emissions is small.

  17. Reintroduction of Native FishReintroduction of Native Fish Species to Coal CreekSpecies to Coal Creek

    E-Print Network [OSTI]

    Gray, Matthew

    1 Reintroduction of Native FishReintroduction of Native Fish Species to Coal CreekSpecies to Coal Control and Reclamation ActSurface Mining Control and Reclamation Act of 1977of 1977 Coal Creek Watershed Foundation (2000)Coal Creek Watershed Foundation (2000) BackgroundBackground Fish populations in Coal Creek

  18. MHK Projects/Coal Creek Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOf KilaueaInformation Other4Q07)AKBrough HeadCentreville OPT

  19. Barriers for steelhead (Oncorhynchus mykiss) smolt migration through the lower flood channel of Alameda Creek

    E-Print Network [OSTI]

    Cervantes-Yoshida, Kristina

    2009-01-01T23:59:59.000Z

    of fish die in Alameda Creek. Oakland Tribune, Oakland.trout. Arcata, CA. Miller, J. 2006. Alameda Creek steelheaddocumentation, Alameda Creek Alliance, www.alamedacreek.org.

  20. Structural characterization of terrestrial microbial Mn oxides from Pinal Creek, AZ

    E-Print Network [OSTI]

    Bargar, John

    2009-01-01T23:59:59.000Z

    Contami- nated Stream, Pinal Creek, Arizona. Masters Thesis,contaminated stream, Pinal Creek, Arizona. Environ. Sci.forming sediment in Pinal Creek, Globe Mining District,

  1. Redesigning Marsh Creek Dam to allow Chinook salmon passage, flood protection, and mercury sedimentation

    E-Print Network [OSTI]

    McNulty, M. Eliza; Wickland, Matthew

    2003-01-01T23:59:59.000Z

    J. E. , 1998. Marsh Creek Watershed Mercury Assessmentbe possible for all of Marsh Creek to be an accessible andD. , unpublished. Marsh Creek mercury assessment and

  2. Post-fire channel changes of Muddy Hollow Creek, Point Reyes National Seashore

    E-Print Network [OSTI]

    Skripnik, Steve; Moshier, Emily

    2004-01-01T23:59:59.000Z

    Changes of Muddy Hollow Creek, Point Reyes National Seashorewatershed of Muddy Hollow Creek was almost entirely burnedchanges to Muddy Hollow Creek and the watershed. They

  3. Hydrologic diversity in Santa Cruz mountain creeks and implications for steelhead population survival

    E-Print Network [OSTI]

    Peterson, Michael

    2012-01-01T23:59:59.000Z

    richardson, in San Gregorio Creek and lagoon, San Mateoalternatives for the Redwood Creek estuary. Redwood NationalWaddell, and Pomponio Creek estuary/lagoon systems, 1985-

  4. A Decade of Changes in the Wildcat Creek Flood Control Channel, North Richmond

    E-Print Network [OSTI]

    Ginsberg, Ben

    2008-01-01T23:59:59.000Z

    of Changes in the Wildcat Creek Flood Control Channel, NorthAbstract: The lower Wildcat Creek flood control and ripariancontinue. Introduction Wildcat Creek Watershed is located in

  5. Hydrogeologic Assessment of the East Bear Creek Unit, San Luis National Wildlife Refuge

    E-Print Network [OSTI]

    Quinn, Nigel W.T.

    2007-01-01T23:59:59.000Z

    Addendum to East Bear Creek Design Data Report, Centraltest wells in East Bear Creek Unit ……………. 41 Appendix B :C : East Bear Creek Refuge Water Supply ……………………………………. 64

  6. Development of a Discharge-Stage Rating Curve for Strawberry Creek

    E-Print Network [OSTI]

    Hunt, Lisa

    2011-01-01T23:59:59.000Z

    Curve for Strawberry Creek Lisa Hunt References Charbonneau,R. 1987. Strawberry Creek Management Plan, Office ofand V.H. Resh. 1992. Strawberry Creek on the University of

  7. Towards a Stable Future: A Design Proposal for Cerrito Creek in Blake Garden, Kensington, California

    E-Print Network [OSTI]

    Greenberg, Karuna; Pinto, Pedro; Sherraden, Catherine

    2010-01-01T23:59:59.000Z

    unprotected banks and the creek bed. The rationale behindconnectivity 4. integrate the creek with the garden: a.Rediscovering Cerrito Creek in Blake Garden. eScholarshi,

  8. Post-restoration changes in bed material and channel features, Redwood Creek, Marin County

    E-Print Network [OSTI]

    Matz, Mike; Purcell, Alison

    2004-01-01T23:59:59.000Z

    for salmonid fish in Redwood Creek. References Cited Cherry,of Water: Life in Redwood Creek. Golden Gate National Parksthe Banducci site, Redwood Creek. Prepared for the National

  9. Fall-run chinook salmon habitat assessment : lower Marsh Creek, Contra Costa, CA

    E-Print Network [OSTI]

    Levine, Jessie; Stewart, Rosalyn

    2004-01-01T23:59:59.000Z

    mean streamflow data, Marsh Creek near Brentwood CA, Marchmean streamflow data, Marsh Creek near Byron CA, 1952-1983.condition of the Marsh Creek watershed. Natural Heritage

  10. Cerrito Creek step-pools: An opportunity for restoration and education at Blake Garden

    E-Print Network [OSTI]

    Behrends, Nathaniel

    2008-01-01T23:59:59.000Z

    Assessment of the Alamo Creek Restoration (East Branch).Vincent H. Resh. 1992. Strawberry Creek on the University ofRediscovering Cerrito Creek in Blake Garden. LA227

  11. Distribution of bed sediment on Clear Creek after removal of Saeltzer Dam

    E-Print Network [OSTI]

    Clayton-Niederman, Z; Gilbreath, Alicia

    2005-01-01T23:59:59.000Z

    of Saeltzer Dam on Clear Creek: An Update, Water Resources83-138. Brown, Matt. 2004. Clear Creek anadromous salmonidto Dam Removal, Clear Creek, California, Water Resources

  12. A Re-design Proposal: Connecting Whole Foods Market and Codornices Creek

    E-Print Network [OSTI]

    Crampton, Matthew; Martin, John

    2007-01-01T23:59:59.000Z

    of San Pablo Avenue entrance along Codornices Creek corridorNovember 2003. Codornices Creek Watershed Restoration Actiongarage next to Codornices Creek. Monroe Avenue 10th Street

  13. Upland groundwater pumping and stream flow, San Jose Creek, Monterey County

    E-Print Network [OSTI]

    Ford, Alexander

    2004-01-01T23:59:59.000Z

    of Field Meeting, Las Garzas Creek Water Rights, Balanceand 23, 1991 San Jose Creek, Williams Canyon, Van Winkleysunnamed tributary to San Jose Creek. Monterey County General

  14. A preliminary assessment of potential steelhead habitat in Sinbad Creek, Alameda County

    E-Print Network [OSTI]

    Herron, Christy; King, Mary Ann; McDonald, Kristen

    2004-01-01T23:59:59.000Z

    Frequency Curve for Alameda Creek 1911-1990. Handout forMichael. 2001. Stonybrook Creek Fish Passage Assessment.trout caught in Sinbad Creek, Sunol, CA. ” credit: Alameda

  15. Final Independent External Peer Review Report Cattaraugus Creek Watershed Ecosystem Restoration

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Final Independent External Peer Review Report Cattaraugus Creek Watershed Ecosystem Restoration of Expertise for Ecosystem Restoration Mississippi Valley Division Contract No. W912HQ-10-D-0002 Task Order Watershed Ecosystem Restoration at Springville Dam, Draft Detailed Project Report/Environmental Assessment

  16. Storm water control plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1996-04-01T23:59:59.000Z

    This document provides the Environmental Restoration Program with information about the erosion and sediment control, storm water management, maintenance, and reporting and record keeping practices to be employed during Phase II of the remediation project for the Lower East Fork Poplar Creek (LEFPC) Operable Unit.

  17. Steel Creek fish, L-Lake/Steel Creek Biological Monitoring Program, January 1986--December 1991

    SciTech Connect (OSTI)

    Sayers, R.E. Jr.; Mealing, H.G. III [Normandeau Associates, Inc., New Ellenton, SC (United States)

    1992-04-01T23:59:59.000Z

    The Savannah River Site (SRS) encompasses 300 sq mi of the Atlantic Coastal plain in west-central South Carolina. The Savannah River forms the western boundary of the site. Five major tributaries of the Savannah River -- Upper Three Runs Creek, Four Mile Creek, Pen Branch, Steel Creek, and Lower Three Runs Creek -- drain the site. All but Upper Three Runs Creek receive, or in the past received, thermal effluents from nuclear production reactors. In 1985, L Lake, a 400-hectare cooling reservoir, was built on the upper reaches of Steel Creek to receive effluent from the restart of L-Reactor, and protect the lower reaches from thermal impacts. The lake has an average width of approximately 600 m and extends along the Steel Creek valley approximately 7000 m from the dam to the headwaters. Water level is maintained at a normal pool elevation of 58 m above mean sea level by overflow into a vertical intake tower that has multilevel discharge gates. The intake tower is connected to a horizontal conduit that passes through the dam and releases water into Steel Creek. The Steel Creek Biological Monitoring Program was designed to meet environmental regulatory requirements associated with the restart of L-Reactor and complements the Biological Monitoring Program for L Lake. This extensive program was implemented to address portions of Section 316(a) of the Clean Water Act. The Department of Energy (DOE) must demonstrate that the operation of L-Reactor will not significantly alter the established aquatic ecosystems.

  18. Two Lost Sonnets by Sterling A. Brown

    E-Print Network [OSTI]

    Tidwell, John E.

    1998-09-01T23:59:59.000Z

    TWO LOST SONNETS BY STERLING A. BROWN edited and introduced by John Edgar Tidwell and Ted Genoways The emergence of Sterling A. Brown into poetic maturity resulted from a well- known dialectical engagement with the aesthetics of African...-American folk tradition. As Brown recounted so often, these experiential and imaginative encounters derived from a benevolent conspiracy between his theologian father, the Rev. Sterling Nelson Brown, and the eminent historian Carter G. Woodson to send...

  19. SALT CREEK ROADWI-80North STADIUMDRIVE

    E-Print Network [OSTI]

    Powers, Robert

    thSt. 0thSt. 1thSt. 2thSt. 3thSt. 4thSt. . t. 10 SALT CREEK ROADWI-80North 10THSTREET 14THSTREET W STADIUM DRIVE PARKING GARAGE 9thSt. 10thSt. 11thSt. 12thSt. 13thSt. 14thSt. 16thSt. 10thSt. SALT CREEK

  20. Bacterial Monitoring for the Buck Creek Watershed 

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    aquifer drawdown from vegetation and irrigation often reduce stream flow; however, several large pools and stretches of the stream retain water throughout the year, except during extreme drought. Base flow in the stream is typically sustained by small... map of the Buck Creek watershed 7 Major aquifers in Texas (Source: Texas Water Development Board) Groundwater Two aquifers, the Seymour and Blaine, underlie the Buck Creek watershed and supply the bulk of available groundwater. The Seymour...

  1. Production-Intent Lost-Motion Variable Valve Actuation Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production-Intent Lost-Motion Variable Valve Actuation Systems Production-Intent Lost-Motion Variable Valve Actuation Systems Variable valve actuation with onoff IEGR pre-bump is...

  2. Remediation cleanup options for the Hoe Creek UCG site

    SciTech Connect (OSTI)

    Nordin, J.; Griffin, W.; Chatwin, T.; Lindblom, S.; Crader, S.

    1990-03-01T23:59:59.000Z

    The US Department of Energy must restore groundwater quality at the Hoe Creek, Wyoming, underground coal gasification site using the best proven practicable technology. Six alternative remediation methods are evaluated in this project: (1) excavation, (2) three variations of groundwater plume containment, (3) in situ vacuum extraction, (4) pump and treat using a defined pattern of pumping wells to obtain an effective matrix sweep, (5) in situ flushing using a surfactant, and (6) in situ bioremediation. Available site characterization data is insufficient to accurately project the cost of remediation. Several alternative hypothetical examples and associated costs are described in the text and in the appendices. However, not enough information is available to use these examples as a basis for comparison purposes. Before a cleanup method is selected, core borings should be taken to define the areal extent and depth of contaminated matrix material. Segments of these core borings should be analyzed for organic contaminants in the soil (e.g., benzene) and their relationship to the groundwater contamination. These analyses and subsequent treatability studies will show whether or not the contaminants can be effectively removed by surface on in situ volatilization, leached from the matrix using washing solutions, or removed by bioremediation. After this information is obtained, each technology should be evaluated with respect to cost and probability of success. A decision tree for implementing remediation cleanup at the Hoe Creek site is presented in this report. 26 refs., 11 figs., 3 tabs.

  3. UMBC POLICY ON LOST AND FOUND PROPERTY I. POLICY STATEMENT

    E-Print Network [OSTI]

    Adali, Tulay

    UMBC POLICY ON LOST AND FOUND PROPERTY I. POLICY STATEMENT The UMBC community will have access to a University Policy on Lost and Found Property. II. PURPOSE OF THE POLICY The purpose of the Lost and Found Property Policy is to provide procedures for the accountability and safekeeping of currency and tangible

  4. Reservoir characterization of Mary Lee and Black Creek coals at the Rock Creek field laboratory, Black Warrior basin. Topical report, May-December 1992

    SciTech Connect (OSTI)

    Young, G.B.C.; Paul, G.W.

    1993-08-01T23:59:59.000Z

    A three-dimensional multi-well simulation study was performed for the Rock Creek project site to better understand the relationships between coal reservoir properties, well completion practices, and actual well performance. The reservoir study provided insights on the efficacy of single versus multiple seam completions, the incremental gas recovery resulting from remedial stimulations, and the impact of well spacing on expected long-term gas recovery. The Mary Lee and Black Creek coal groups were characterized by matching production and pressure history for eight Rock Creek producing wells and their surrounding monitor wells. The simulation grid included the Oak Grove mine and degas field located south of the Rock Creek site. Results of well test analyses, corehole-based gas content measurements, and individual coal group gas production from zone isolation packer tests were used to validate the simulation results. Various hydraulic fracture and remedial stimulations were analyzed to compare the effectiveness of different stimulation designs used at the site. Alternative well spacing strategies were examined to assess the effects of interference on long-term gas recovery.

  5. Hoe Creek groundwater restoration, 1989

    SciTech Connect (OSTI)

    Renk, R.R.; Crader, S.E.; Lindblom, S.R.; Covell, J.R.

    1990-01-01T23:59:59.000Z

    During the summer of 1989, approximately 6.5 million gallons of contaminated groundwater were pumped from 23 wells at the Hoe Creek underground coal gasification site, near Gillette, Wyoming. The organic contaminants were removed using activated carbon before the water was sprayed on 15.4 acres at the sites. Approximately 2647 g (5.8 lb) of phenols and 10,714 g (23.6 lb) of benzene were removed from the site aquifers. Phenols, benzene, toluene, ethylbenzene, and naphthalene concentrations were measured in 43 wells. Benzene is the only contaminant at the site exceeds the federal standard for drinking water (5 {mu}g/L). Benzene leaches into the groundwater and is slow to biologically degrade; therefore, the benzene concentration has remained high in the groundwater at the site. The pumping operation affected groundwater elevations across the entire 80-acre site. The water levels rebounded quickly when the pumping operation was stopped on October 1, 1989. Removing contaminated groundwater by pumping is not an effective way to clean up the site because the continuous release of benzene from coal tars is slow. Benzene will continue to leach of the tars for a long time unless its source is removed or the leaching rate retarded through mitigation techniques. The application of the treated groundwater to the surface stimulated plant growth. No adverse effects were noted or recorded from some 60 soil samples taken from twenty locations in the spray field area. 20 refs., 52 figs., 8 tabs.

  6. Final Independent External Peer Review Report Bubbly Creek Ecosystem Restoration

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Final Independent External Peer Review Report Bubbly Creek Ecosystem Restoration Feasibility Study National Planning Center of Expertise for Ecosystem Restoration Mississippi Valley Division Contract No. W Report Bubbly Creek Ecosystem Restoration Feasibility Study Prepared by Battelle 505 King Avenue Columbus

  7. Ichnotaxonomic assessment of Mazon Creek area trace fossils, Illinois, USA

    E-Print Network [OSTI]

    LoBue, David J.

    2010-08-12T23:59:59.000Z

    The Francis Creek Shale Member (FCSM) of the Mid-Pennsylvanian Carbondale Formation along Mazon Creek in northern Illinois is known for soft-bodied organisms preserved within siderite concretions. Trace fossils, though ...

  8. Recommendation 195: Mitigation of Contamination in Bear Creek Burial Grounds

    Broader source: Energy.gov [DOE]

    The ORSSAB requests DOE provide possible remedial actions to mitigate releases of contamination from Bear Creek Burial Grounds.

  9. Steel Creek fish: L-Lake/Steel Creek Biological Monitoring Program, January 1986--December 1987

    SciTech Connect (OSTI)

    Paller, M.H.; Heuer, J.H.; Kissick, L.A.

    1988-03-01T23:59:59.000Z

    Fish samples were collected from Steel Creek during 1986 and 1987 following the impoundment of the headwaters of the stream to form L-Lake, a cooling reservoir for L-Reactor which began operating late in 1985. Electrofishing and ichthyoplankton sample stations were located throughout the creek. Fykenetting sample stations were located in the creek mouth and just above the Steel Creek swamp. Larval fish and fish eggs were collected with 0.5 m plankton nets. Multivariate analysis of the electrofishing data suggested that the fish assemblages in Steel Creek exhibited structural differences associated with proximity to L-Lake, and habitat gradients of current velocity, depth, and canopy cover. The Steel Creek corridor, a lotic reach beginning at the base of the L-Lake embankment was dominated by stream species and bluegill. The delta/swamp, formed where Steel Creek enters the Savannah River floodplain, was dominated by fishes characteristic of slow flowing waters and heavily vegetated habitats. The large channel draining the swamp supported many of the species found in the swamp plus riverine and anadromous forms.

  10. ASSESSMENT OF LIVESTOCK WINTERING AREAS IN BRIDGE CREEK BASIN, 1996

    E-Print Network [OSTI]

    #12;ASSESSMENT OF LIVESTOCK WINTERING AREAS IN BRIDGE CREEK BASIN, 1996 DOE FRAP 1996-03 Prepared-96.............................................. 22 LIST OF FIGURES Figure 1. Bridge Creek basin livestock wintering area back assessment, 1996 quality in the Bridge Creek basin are assessed. These sites had been inspected in the winter and spring

  11. Clear Creek Athletic Complex Marv Kay Stadium at Campbell Field

    E-Print Network [OSTI]

    Clear Creek Athletic Complex Marv Kay Stadium at Campbell Field Mines Athletic Center #12;· Site Creek Athletic Complex Marv Kay Stadium at Campbell Field Mines Athletic Center #12;Mines Master Plan 2010 #12;Clear Creek Athletic Complex Site Plan #12;Site Plan #12;Pedestrian Circulation #12;Vehicular

  12. Bridge Creek Watershed Volunteer Lake Secchi Disk Monitoring Program

    E-Print Network [OSTI]

    #12;Bridge Creek Watershed Volunteer Lake Secchi Disk Monitoring Program 1996 DOE FRAP 1996-13 Ryan Creek Watershed Volunteer Lake Monitoring Program. Using a Secchi disk, volunteers collected water transparency data from 22 lakes in the Bridge Creek watershed. Secchi depth readings were collected between May

  13. State of the Watershed: Water Quality of Boulder Creek, Colorado

    E-Print Network [OSTI]

    State of the Watershed: Water Quality of Boulder Creek, Colorado By Sheila F. Murphy Prepared of the watershed : water quality of Boulder Creek, Colorado / by Sheila Murphy. p. cm. ­(USGS Circular ; 1284) Includes bibliographic references. 1. Water quality -- Colorado -- Boulder Creek Watershed (Boulder

  14. Primary cementing across massive lost circulation zones

    SciTech Connect (OSTI)

    Turki, W.H.; Mackay, A.S.

    1983-03-01T23:59:59.000Z

    As a result of severe lost circulation problems in some wells in the Ghawar and Abqaiq Fields, Aramco has been unable to cover the Umm Er-Radhuma (Paleocene) and Wasia (Cretaceous) aquifers with cement. This has necessitated setting an extended liner opposite the Wasia aquifer, to ensure that there are two casing strings and a cement sheath across the aquifer, resulting in increased casing cost and reduced well productivity. This paper describes the results of field trial tests performed, along with conclusions and recommendations aimed at solving this problem. Field methods employed include light weight extended cements, ultra-light cement slurries weighing as little as 55 lbm/ft/sup 3/ (pcf), using ceramic hollow spheres, glass bubbles and foam, plus hydrostatic cementing, and mechanical devices. Finally, methods of job evaluation are discussed. These include temperature surveys, bond logs, radioactive tracers, and a new cement volume log.

  15. Improvement of Anadromous Fish Habitat and Passage in Omak Creek, 2008 Annual Report : February 1, 2008 to January 31, 2009.

    SciTech Connect (OSTI)

    Dasher, Rhonda; Fisher, Christopher [Colville Confederated Tribes

    2009-06-09T23:59:59.000Z

    During the 2008 season, projects completed under BPA project 2000-100-00 included installation of riparian fencing, maintenance of existing riparian fencing, monitoring of at-risk culverts and installation of riparian vegetation along impacted sections of Omak Creek. Redd and snorkel surveys were conducted in Omak Creek to determine steelhead production. Canopy closure surveys were conducted to monitor riparian vegetation recovery after exclusion of cattle since 2000 from a study area commonly known as the Moomaw property. Additional redd and fry surveys were conducted above Mission Falls and in the lower portion of Stapaloop Creek to try and determine whether there has been successful passage at Mission Falls. Monitoring adult steelhead trying to navigate the falls resulted in the discovery of shallow pool depth at an upper pool that is preventing many fish from successfully navigating the entire falls. The Omak Creek Habitat and Passage Project has worked with NRCS to obtain additional funds to implement projects in 2009 that will address passage at Mission Falls, culvert replacement, as well as additional riparian planting. The Omak Creek Technical Advisory Group (TAG) is currently revising the Omak Creek Watershed Assessment. In addition, the group is revising strategy to focus efforts in targeted areas to provide a greater positive impact within the watershed. In 2008 the NRCS Riparian Technical Team was supposed to assess areas within the watershed that have unique problems and require special treatments to successfully resolve the issues involved. The technical team will be scheduled for 2009 to assist the TAG in developing strategies for these special areas.

  16. Campbell Creek Research Homes FY 2012 Annual Performance Report

    SciTech Connect (OSTI)

    Gehl, Anthony C [ORNL; Munk, Jeffrey D [ORNL; Jackson, Roderick K [ORNL; Boudreaux, Philip R [ORNL; Khowailed, Gannate A [ORNL

    2013-01-01T23:59:59.000Z

    The Campbell Creek project is funded and managed by the Tennessee Valley Authority (TVA) Technology Innovation, Energy Efficiency, Power Delivery & and Utilization Office. Technical support is provided under contract by the Oak Ridge National Laboratory (ORNL) and the Electric Power Research Institute.The project was designed to determine the relative energy efficiency of typical new home construction, energy efficiency retrofitting of existing homes, and high -performance new homes built from the ground up for energy efficiency. This project will compare three houses that represented the current construction practice as a base case (Builder House CC1); a modified house that could represent a major energy- efficient retrofit (Retrofit House CC2); and a house constructed from the ground up to be a high- performance home (High Performance House CC3). In order tTo enablehave a valid comparison, it was necessary to simulate occupancy in all three houses and heavily monitor the structural components and the energy usage by component. All three houses are two story, slab on grade, framed construction. CC1 and CC2 are approximately 2,400 square feet2. CC3 has a pantry option, that is primarily used as a mechanical equipment room, that adds approximately 100 square feet2. All three houses are all-electric (with the exception of a gas log fireplace that is not used during the testing), and use air-source heat pumps for heating and cooling. The three homes are located in Knoxville in the Campbell Creek Subdivision. CC1 and CC2 are next door to each other and CC3 is across the street and a couple of houses down. The energy data collected will be used to determine the benefits of retrofit packages and high -performance new home packages. There are over 300 channels of continuous energy performance and thermal comfort data collection in the houses (100 for each house). The data will also be used to evaluate the impact of energy -efficient upgrades ton the envelope, mechanical equipment, or demand -response options. Each retrofit will be evaluated incrementally, by both short -term measurements and computer modeling, using a calibrated model. This report is intended to document the comprehensive testing, data analysis, research, and findings within the January 2011 through October 2012 timeframe at the Campbell Creek research houses. The following sections will provide an in-depth assessment of the technology progression in each of the three research houses. A detailed assessment and evaluation of the energy performance of technologies tested will also be provided. Finally, lessons learned and concluding remarks will be highlighted.

  17. Collaborative Monitoring in Walnut Creek, California1

    E-Print Network [OSTI]

    Standiford, Richard B.

    that they gained insight into priorities of Preserve users and knowledge of areas that might require new management regeneration and native grass populations in target management areas in the four Open Space Preserves and had to re-examine some of their own assumptions. The City of Walnut Creek managers stated

  18. Range Creek Calibrated Dates Beta-202190

    E-Print Network [OSTI]

    Provancher, William

    Range Creek Calibrated Dates 0 200 400 600 800 1000 1200 1400 Beta-202190 Beta-175753 Beta-175755 Beta-235067 Beta-202189 Beta-214831 Beta-202188 Beta-202191 Beta-203630 Beta-214832 Beta-175754 Beta a Carbon-14 calibrated date (95% CI) between 1000 and 1200 C.E. (Figure 5: Beta-235067). The calibrated

  19. Progress in The Lost Circulation Technology Development Program

    SciTech Connect (OSTI)

    Glowka, D.A.; Schafer, D.M.; Loeppke, G.E.; Wright, E.K.

    1991-01-01T23:59:59.000Z

    Lost circulation is the loss of drilling fluid from the wellbore to fractures or pores in the rock formation. In geothermal drilling, lost circulation is often a serious problem that contributes greatly to the cost of the average geothermal well. The Lost Circulation Technology Development Program is sponsored at Sandia National Laboratories by the US Department of Energy. The goal of the program is to reduce lost circulation costs by 30--50{percent} through the development of mitigation and characterization technology. This paper describes the technical progress made in this program during the period April, 1990--March, 1991. 4 refs., 15 figs., 1 tab.

  20. Carneros Creek: Assessing restoration implications for a sinuous stream using 1-dimensional and 2-dimensional simulation models

    E-Print Network [OSTI]

    Beagle, Julie; Marzion, Rachael; Matella, Mary

    2008-01-01T23:59:59.000Z

    Use History of the Carneros Creek watershed: A component ofplan for the Carneros Creek watershed, Napa County,Lower San Francisquito Creek Watershed Aquatic Habitat

  1. C(re)ek-storation Community Collaboration Site: North Fork of Strawberry Creek by La Loma and Le Conte Avenues

    E-Print Network [OSTI]

    Tannenbaum, Sara Rose

    2011-01-01T23:59:59.000Z

    berkeley_landmarks/theta-xi.html. Urban Creeks Council.2007. Codornices Creek Watershed Restoration Action Plan (336-361. NRPI. Codornices Creek at Ohlone Greenway. Accessed

  2. Mitigation of light rail transit construction on jurisdictional areas in the White Rock Creek floodplain, Dallas, Texas

    E-Print Network [OSTI]

    Schieffer, Emily; Smiley, Jerry

    2001-01-01T23:59:59.000Z

    AREAS IN THE WHITE ROCK CREEK FLOODPLAIN, DALLAS, TEXAS1.2-miles of the White Rock Creek floodplain near theconfluence of three creeks and adjacent to approximately

  3. Effects of a livestock exclosure on channel morphology and vegetation along Long Creek in Lake County, Oregon

    E-Print Network [OSTI]

    Doehring, Carolyn; Rubin, Zan; Sahai, Rashmi

    2011-01-01T23:59:59.000Z

    reaches of Wickiup Creek in Eastern Oregon. Physicalof beaver dams in Bridge Creek, an incised stream channel inavailable data from Long Creek Cross Sections Sites Reach1

  4. Campbell Creek TVA 2010 First Year Performance Report July 1, 2009 August 31, 2010

    SciTech Connect (OSTI)

    Christian, Jeffrey E [ORNL; Gehl, Anthony C [ORNL; Boudreaux, Philip R [ORNL; New, Joshua Ryan [ORNL

    2010-10-01T23:59:59.000Z

    This research project was initiated by TVA in March 2008 and encompasses three houses that are of similar size, design and located within the same community - Campbell Creek, Farragut TN with simulated occupancy. This report covers the performance period from July 1, 2009 to August 31, 2010. It is the intent of TVA that this Valley Data will inform electric utilities future residential retrofit incentive program.

  5. Steel Creek primary producers: Periphyton and seston, L-Lake/Steel Creek Biological Monitoring Program, January 1986--December 1991

    SciTech Connect (OSTI)

    Bowers, J.A. [Westinghouse Savannah River Co., Aiken, SC (United States); Toole, M.A.; van Duyn, Y. [Normandeau Associates Inc., New Ellenton, SC (United States)

    1992-02-01T23:59:59.000Z

    The Savannah River Site (SRS) encompasses 300 sq mi of the Atlantic Coastal Plain in west-central South Carolina. Five major tributaries of the Savannah River -- Upper Three Runs Creek, Four Mile Creek, Pen Branch, Steel Creek, and Lower Three Runs Creek -- drain the site. In 1985, L Lake, a 400-hectare cooling reservoir, was built on the upper reaches of Steel Creek to receive effluent from the restart of L-Reactor and to protect the lower reaches from thermal impacts. The Steel Creek Biological Monitoring Program was designed to assess various components of the system and identify and changes due to the operation of L-Reactor or discharge from L Lake. An intensive ecological assessment program prior to the construction of the lake provided baseline data with which to compare data accumulated after the lake was filled and began discharging into the creek. The Department of Energy must demonstrate that the operation of L-Reactor will not significantly alter the established aquatic ecosystems. This report summarizes the results of six years` data from Steel Creek under the L-Lake/Steel Creek Monitoring Program. L Lake is discussed separately from Steel Creek in Volumes NAI-SR-138 through NAI-SR-143.

  6. Albeni Falls-Sand Creek

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProducts (VAP) VAP7-0973ManagedStrategic GrowthAlbany-Eugene-Rebuild-Project

  7. Geomorphic, vegetation and flooding characteristics for lower San Pablo Creek : a baseline study

    E-Print Network [OSTI]

    Anderson, Shannah; Balazs, Carolina

    2004-01-01T23:59:59.000Z

    of California at Berkeley. Urban Creeks Council.2002.San Pablo Creek at Kennedy Plaza Park Bank Restoration.Upper Alluvial Valley. The creek in this area was incised 25

  8. Hydrogeology and tritium transport in Chicken Creek Canyon, Lawrence Berkeley National Laboratory, Berkeley, California

    E-Print Network [OSTI]

    Jordan, Preston D.; Javandel, Iraj

    2007-01-01T23:59:59.000Z

    exposures in upper Chicken Creek Canyon. Figure 3-2a.Borings and test pits in Chicken Creek Canyon. Figure 3-2b.portion of upper Chicken Creek Canyon. Figure 3-2c. Borings

  9. The influence of large woody debris on channel form, upper Scott Creek, Santa Cruz County

    E-Print Network [OSTI]

    Garcia, Luis; Orduna, Rodrigo

    2004-01-01T23:59:59.000Z

    Introduction The Scott Creek Watershed (Cal Water versionto the Pacific Ocean. Scott Creek hosts runs of Steelhead (O. mykiss) do inhabit the creek. We studied a reach of Scott

  10. AN INVESTIGATION OF DEWATERING FOR THE MODIFIED IN-SITU RETORTING PROCESS, PICEANCE CREEK BASIN, COLORADO

    E-Print Network [OSTI]

    Mehran, M.

    2013-01-01T23:59:59.000Z

    J:''-~orraation v Piceance Creek Basin v Colorado r and 9 p'C~b Tract, Piceance Creek Basin, Colorado," Report to Oc~for Piceance and Yellow Creek Watersheds," Environmental

  11. Perspectives on Dam Removal: York Creek Dam and the Water Framework Directive

    E-Print Network [OSTI]

    Lawrence, Justin E; Pollak, Josh D; Richmond, Sarah F

    2008-01-01T23:59:59.000Z

    3. Long-profile of York Creek (figure adapted from report byFigure 5. Facies map for York Creek about 100 ft downstreamon Dam Removal: York Creek Dam and the Water Framework

  12. Spatial and temporal ecology of native and introduced fish larvae in Lower Putah Creek, California

    E-Print Network [OSTI]

    Marchetti, Michael P; Moyle, Peter B

    1999-01-01T23:59:59.000Z

    fish in Lower Putah Creek (Yolo Co. CA). Environmentaland non-native taxa totals. Dry Creek drift light PedricRoad drift light Dry Creek drift light Russell drift ligh

  13. Improving Remedial Planning Performance: The Rattlesnake Creek Experience

    SciTech Connect (OSTI)

    Rieman, C.R.; Spector, H.L.; Andrews, S.M. [U.S. Army Corps of Engineers, Buffalo District, 1776 Niagara St., Buffalo, NY 14207 (United States); Durham, L. A.; Johnson, R. L. [Argonne National Laboratory, 9700 S. Cass Ave., EVS 900, Argonne, IL 60439 (United States); Racino, R. R. [Cabrera Services, Inc., 29 Railroad Avenue, Middletown, NY 10940 (United States)

    2006-07-01T23:59:59.000Z

    The U.S. Army Corps of Engineers (USACE), Buffalo District, has responsibility for characterizing and remediating radiologically contaminated properties under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Most of these FUSRAP sites include radionuclide contamination in soils where excavation and offsite disposal is the selected remedial action. For many FUSRAP soil remediation projects completed to date, the excavated contaminated soil volumes have significantly exceeded the pre-excavation volume estimates that were developed for project planning purposes. The exceedances are often attributed to limited and sparse datasets that are used to calculate the initial volume estimates. These volume exceedances complicate project budgeting and planning. Building on these experiences, the USACE took a different approach in the remediation of Rattlesnake Creek, located adjacent to the Ashland 2 site, in Tonawanda, New York. This approach included a more extensive pre-design data collection effort to improve and reduce the uncertainty in the pre-excavation volume estimates, in addition to formalizing final status survey data collection strategies prior to excavation. The final status survey sampling was fully integrated with the pre-design data collection, allowing dual use of the pre-design data that was collected (i.e., using the data to close out areas where contamination was not found, and feeding the data into volume estimates when contamination was encountered). The use of real-time measurement techniques (e.g., X-ray fluorescence [XRF] and gamma walkover surveys) during pre-excavation data collection allowed the USACE to identify and respond to unexpected contamination by allocating additional data collection to characterizing new areas of concern. The final result was an estimated soil volume and excavation footprint with a firm technical foundation and a reduction in uncertainty. However, even with extensive pre-design data collection, additional contamination was found during the excavation that led to an increase in the soil volume requiring offsite disposal. This paper describes the lessons learned regarding improving remedial planning performance from the Rattlesnake Creek experience and evaluates the level of project uncertainty reduction achieved through pre-design data collection. (authors)

  14. White Creek and Nine Canyon wind farms Fact Sheet

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    additional wind storage and shaping services. Since these White Creek and Nine Canyon wind farms December 2006 2 Bonne ville Power Administration DOEBP-3770 November 2006...

  15. AVTA: Clipper Creek AC Level 2 Charging System Testing Results...

    Broader source: Energy.gov (indexed) [DOE]

    electric vehicles. This research was conducted by Idaho National Laboratory. Clipper Creek AC Level 2 - February 2012 More Documents & Publications AVTA: Aerovironment AC Level...

  16. Omak Creek land acquisition Fact Sheet.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    factsheet factsheet Omak Creek acquisition to protect summer steelhead habitat The Bonneville Power Administration is proposing to fund the purchase of two adjacent land parcels to...

  17. Acquisition of Wildlife Habitat in the Calispell Creek Watershed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Calispell Creek watershed in Pend Oreille County, Wash. BPA funds the Albeni Falls Wildlife Mitigation Program, which is tasked with the acquisition and restoration of key...

  18. New Jersey Nuclear Profile - PSEG Hope Creek Generating Station

    U.S. Energy Information Administration (EIA) Indexed Site

    PSEG Hope Creek Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

  19. Microsoft Word - CX_Beaver Creek.doc

    Broader source: Energy.gov (indexed) [DOE]

    (BPA) funding to acquire the Beaver Creek property and to maintain this property for fish and wildlife habitat protection. Budget Information: Work Order 00225478 Fish and...

  20. Mantle Helium And Carbon Isotopes In Separation Creek Geothermal...

    Open Energy Info (EERE)

    Mantle Helium And Carbon Isotopes In Separation Creek Geothermal Springs, Three Sisters Area, Central Oregon- Evidence For Renewed Volcanic Activity Or A Long Term Steady State...

  1. E-Print Network 3.0 - asotin creek instream Sample Search Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Watershed Council Water Quality Monitoring Program Summary: is of interest. To improve in-stream flow restoration effectiveness, implementation of the Whychus Creek... Creek...

  2. Assessing the Feasibility of Creek Daylighting in San Francisco, Part II: A Preliminary Analysis of Yosemite Creek

    E-Print Network [OSTI]

    Smith, Brooke Ray

    2007-01-01T23:59:59.000Z

    or purchased properties) to daylight the stream? Or is itrestoration (Smith 2007). Why Daylight in San Francisco? Inof San Francisco to daylight Yosemite Creek, how and where

  3. DRAFT ENVIRONMENTAL ASSESSMENT1 PINE CREEK DAM, OKLAHOMA2

    E-Print Network [OSTI]

    US Army Corps of Engineers

    #12;#12;DRAFT ENVIRONMENTAL ASSESSMENT1 PINE CREEK DAM, OKLAHOMA2 DAM SAFETY MODIFICATION3 &4 Environmental Assessment Pine Creek Dam, Oklahoma Dam Safety Modification & Interim Risk Reduction Measure of Federal Regulations, Part 230, the Tulsa District has assessed the environmental impacts of modifications

  4. Level 2 Diagnosis and Project Inventory, Lower Snake Tributaries Prepared by: Mobrand Biometrics, Inc.

    E-Print Network [OSTI]

    Level 2 Diagnosis and Project Inventory, Lower Snake Tributaries Prepared by: Mobrand Biometrics for Almota steelhead, and Figure 2 is a combined Level 2 Diagnosis/Project Inventory for Deadman Creek

  5. Bear Creek Valley Watershed | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureComments fromofBatteries from Brine Batteries fromThermalBe aBear Creek

  6. Forest Creek Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualPropertyd8c-a9ae-f8521cbb8489Information HydroFontana, California:Group JumpHighCreek Wind

  7. Papalote Creek Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcernsCompanyPCN Technology Jump2011) |PanasonicPapalote Creek Wind

  8. Fermilab | Tritium at Fermilab | Kress Creek Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.New Mexico Feb. 13, 2013FocusreceivesTraffic SafetyKress Creek

  9. Cobb Creek Geothermal Facility | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:PowerCER.png El CER esDatasetCityFundCo-benefitsCoalogix IncCobb Creek

  10. Scotch Creek Wildlife Area BPA Project #1996-094-01

    E-Print Network [OSTI]

    Complex. · 1991-2009: 11,117 additional acres purchased with WWRP and BPA funds, total of 23,770 acres-steppe · 107,900 trees and shrubs planted to restore critical riparian habitat · Weed control on 7,435 acres Suplementation #12;Immediate Management Needs ·Continue Maintenance on previous enhancements to ensure quality

  11. EA-0939: Blue Creek Winter Range: Wildlife Mitigation Project, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy's Bonneville Power Administration to secure land and conduct wildlife habitat enhancement and long term...

  12. EA-1023: Willow Creek Wildlife Mitigation Project, Eugene, Oregon

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration's proposal to fund habitat acquisition (of land or a conservation easement), wildlife...

  13. Tassajara Creek restoration project: Continued riparian habitat monitoring

    E-Print Network [OSTI]

    Trinh, Michelle; Percelay, Julie

    2008-01-01T23:59:59.000Z

    Dublin Comprehensive Stream Restoration Program. Tompkins,Berkeley LA 227 Restoration of Rivers and Streams December

  14. An economic evaluation of the Green Creek Watershed Project

    E-Print Network [OSTI]

    Gray, Roy Mack

    1968-01-01T23:59:59.000Z

    diversified operations. There are many small dairies which scil milk to processor, : and distributors outside the area. Because of the 14 predominance of livestocl enterprises, about 75 percent of the crop- land is used for production of feed and orazing...

  15. Kingston Creek Hydro Project Powers 100 Households | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently Asked Questions for DOEtheInspection15Department10PM to 1:40PM PDTKill-a-WattKingston

  16. Reservoir heterogeneity in Carter Sandstone, North Blowhorn Creek oil unit and vicinity, Black Warrior Basin, Alabama

    SciTech Connect (OSTI)

    Kugler, R.L.; Pashin, J.C.

    1992-05-01T23:59:59.000Z

    This report presents accomplishments made in completing Task 3 of this project which involves development of criteria for recognizing reservoir heterogeneity in the Black Warrior basin. The report focuses on characterization of the Upper Mississippian Carter sandstone reservoir in North Blowhorn Creek and adjacent oil units in Lamar County, Alabama. This oil unit has produced more than 60 percent of total oil extracted from the Black Warrior basin of Alabama. The Carter sandstone in North Blowhorn Creek oil unit is typical of the most productive Carter oil reservoirs in the Black Warrior basin of Alabama. The first part of the report synthesizes data derived from geophysical well logs and cores from North Blowhorn Creek oil unit to develop a depositional model for the Carter sandstone reservoir. The second part of the report describes the detrital and diagenetic character of Carter sandstone utilizing data from petrographic and scanning electron microscopes and the electron microprobe. The third part synthesizes porosity and pore-throat-size-distribution data determined by high-pressure mercury porosimetry and commercial core analyses with results of the sedimentologic and petrographic studies. The final section of the report discusses reservoir heterogeneity within the context of the five-fold classification of Moore and Kugler (1990).

  17. Hoe Creek 1990 quarterly sampling cumulative report

    SciTech Connect (OSTI)

    Crader, S.E.; Huntington, G.S.

    1991-03-01T23:59:59.000Z

    Groundwater samples were collected and analyzed for benzene and for total phenols three times during 1990. This report summarizes the results of these sampling events and compares the results with those obtained in previous years. Possible further options for remediation of the Hoe Creek site was addressed. Three underground coal gasification (UCG) burns were performed by Lawrence Livermore National Laboratory for the US Department of Energy in 1976, 1977, and 1979 at the Hoe Creek site, which is about 20 miles south of Gillette, Wyoming. As a result of these burns, there has been considerable contamination of groundwater by various organic compounds. There have been three efforts at remediating this situation. In 1986 and again in 1987, contaminated water was pumped out, treated, and reinjected. In 1989, the water was pumped, treated, and sprayed into the atmosphere. Benzene and total phenols have been monitored at various monitoring wells as the site during 1990. The highest detected benzene concentration in 1990 was 220 {mu}g/L, and the highest total phenols concentration was 430 {mu}g/L. It is apparent that contamination is still above baseline levels, although the concentration of total phenols is far less than immediately after the burns. The burned coal seams are still releasing organic compounds into the groundwater that passes through them.

  18. Reintroduction of Lower Columbia River Chum Salmon into Duncan Creek, 2007 Annual Report.

    SciTech Connect (OSTI)

    Hillson, Todd D. [Washington Department of Fish and Wildlife

    2009-06-12T23:59:59.000Z

    The National Marine Fisheries Service (NMFS) listed Lower Columbia River (LCR) chum salmon as threatened under the Endangered Species Act (ESA) in March, 1999 (64 FR 14508, March 25, 1999). The listing was in response to the reduction in abundance from historical levels of more than one-half million returning adults to fewer than 10,000 present-day spawners. Harvest, habitat degradation, changes in flow regimes, riverbed movement and heavy siltation have been largely responsible for this decline. The timing of seasonal changes in river flow and water temperatures is perhaps the most critical factor in structuring the freshwater life history of this species. This is especially true of the population located directly below Bonneville Dam, where hydropower operations can block access to spawning sites, dewater redds, strand fry, cause scour or fill of redds and increase sedimentation of spawning gravels. Prior to 1997, only two chum salmon populations were recognized as genetically distinct in the Columbia River, although spawning had been documented in many Lower Columbia River tributaries. The first population was in the Grays River (RKm 34), a tributary of the Columbia River, and the second was a group of spawners utilizing the mainstem Columbia River just below Bonneville Dam (RKm 235) adjacent to Ives Island and in Hardy and Hamilton creeks. Using additional DNA samples, Small et al. (2006) grouped chum salmon spawning in the mainstem Columbia River and the Washington State tributaries into three groups: the Coastal, the Cascade and the Gorge. The Coastal group comprises those spawning in the Grays River, Skamokawa Creek and the broodstock used at the Sea Resources facility on the Chinook River. The Cascade group comprises those spawning in the Cowlitz (both summer and fall stocks), Kalama, Lewis, and East Fork Lewis rivers, with most supporting unique populations. The Gorge group comprises those spawning in the mainstem Columbia River from the I-205 Bridge up to Bonneville Dam and those spawning in Hamilton and Hardy creeks. Response to the federal ESA listing has been primarily through direct-recovery actions: reducing harvest, hatchery supplementation using local broodstock for populations at catastrophic risk, habitat restoration (including construction of spawning channels) and flow agreements to protect spawning and rearing areas. Both state and federal agencies have built controlled spawning areas. In 1998, the Washington Department of Fish and Wildlife (WDFW) began a chum salmon supplementation program using native stock on the Grays River. This program was expanded during 1999 - 2001 to include reintroduction into the Chinook River using eggs from the Grays River Supplementation Program. These eggs are incubated at the Grays River Hatchery, reared to release size at the Sea Resources Hatchery on the Chinook River, and the fry are released at the mouth of the Chinook River. Native steelhead, chum, and coho salmon are present in Duncan Creek, and are recognized as subpopulations of the Lower Gorge population, and are focal species in the Lower Columbia Fish Recovery Board (LCFRB) plan. Steelhead, chum and coho salmon that spawn in Duncan Creek are listed as Threatened under the ESA. Duncan Creek is classified by the LCFRB plan as a watershed for intensive monitoring (LCFRB 2004). This project was identified in the 2004 Federal Columbia River Power System (FCRPS) revised Biological Opinion (revised BiOp) to increase survival of chum salmon, 'BPA will continue to fund the program to re-introduce Columbia River chum salmon into Duncan Creek as long as NOAA Fisheries determines it to be an essential and effective contribution to reducing the risk of extinction for this ESU'. (USACE et al. 2004, page 85-86). The Governors Forum on Monitoring and Salmon Recovery and Watershed Health recommends one major population from each ESU have adult and juvenile monitoring. Duncan Creek chum salmon are identified in this plan to be intensively monitored. Planners recommended that a combination of natural and hatchery production

  19. A Tidal Hydrology Assessment for Reconnecting Spring Branch Creek to Suisun Marsh, Solano County CA: Predicting the Impact to the Federally Listed Plant Soft Bird's Beak

    E-Print Network [OSTI]

    Olson, Jessica J.

    2011-01-01T23:59:59.000Z

    population in Spring Branch Creek has experienced decline inand up the Spring Branch Creek gradient on its own. Withor up the Spring Branch Creek gradient is necessary. 12

  20. EA-1895: Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration was preparing this EA to evaluate the potential environmental impacts of replacing an existing seasonal fish weir with a permanent weir, which would have been used to monitor federally-listed Snake River steelhead and collect spring Chinook salmon adults to support ongoing supplementation programs in the watershed. The Bureau of Land Management, a cooperating agency, preliminarily determined Lolo Creek to be suitable for Congressional designation into the Wild and Scenic River System. The EA included a Wild and Scenic River Section 7 analysis. This project was canceled.

  1. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1996-04-01T23:59:59.000Z

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449&D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit.

  2. Microsoft Word - XX 13 Coyote Creek land acquisition provides...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wildlife Area and the city of Eugene's Coyote Prairie wetland mitigation site, Coyote Creek provides a mix of rare wet prairie and riparian forest. Purchased through a closed-bid...

  3. Alternative Perspectives on the Battle of Wolf Creek of 1938

    E-Print Network [OSTI]

    Warde, Mary Jane

    2001-09-01T23:59:59.000Z

    The Battle of Wolf Creek in northwestern Oklahoma in 1838 was highly significant to the Cheyenne, Arapaho, Kiowa, Comanche, and Plains Apache tribes, but little known beyond their mutual frontier. Their oral accounts of the battle allow us...

  4. TR-019 Hydrology March 2002 Roberts Creek Study Forest

    E-Print Network [OSTI]

    TR-019 Hydrology March 2002 Roberts Creek Study Forest: effects of partial retention harvesting, 250-751-7001 Research Disciplines: Ecology ~ Geology ~ Geomorphology ~ Hydrology ~ Pedology ~ Geomorphology ~ Hydrology ~ Pedology ~ Silviculture ~ Wildlife Abstract

  5. Sediment dynamics of an impounded river: Yegua Creek, Texas

    E-Print Network [OSTI]

    Martinez, Adriana Elizabeth

    2009-05-15T23:59:59.000Z

    Dams have altered flow distributions in rivers everywhere, causing a host of changes in channel morphology and sediment dynamics. Although major changes in flow regime have occurred along Yegua Creek, Texas, since the closure of Somerville Dam...

  6. Fusion Power: I Think We're Lost

    E-Print Network [OSTI]

    1 Fusion Power: I Think We're Lost Robert L. Hirsch Consultant November 18, 2002 Presented to the Burning Plasma Assessment Committee of the National Research Council #12;2 How to Tell People Things and Technology. Summer 1997 & fall 1999. 2. Kaslow, J., et al. CRITERIA FOR PRACTICAL FUSION POWER SYSTEMS. EPRI

  7. KOSHLIAKOV'S FORMULA AND GUINAND'S FORMULA IN RAMANUJAN'S LOST NOTEBOOK

    E-Print Network [OSTI]

    Berndt, Bruce C.

    KOSHLIAKOV'S FORMULA AND GUINAND'S FORMULA IN RAMANUJAN'S LOST NOTEBOOK BRUCE C. BERNDT1 , YOONBOK involving the modified Bessel function K(z). These include Koshliakov's formula and Guinand's formula, both by these authors several years after Ramanujan's death. Other formulas, including one by K. Soni and two

  8. Oil and Gas Production Optimization; Lost Potential due to Uncertainty

    E-Print Network [OSTI]

    Johansen, Tor Arne

    Oil and Gas Production Optimization; Lost Potential due to Uncertainty Steinar M. Elgsaeter Olav.ntnu.no) Abstract: The information content in measurements of offshore oil and gas production is often low, and when in the context of offshore oil and gas fields, can be considered the total output of production wells, a mass

  9. Calibration of the TFTR lost alpha diagnostic R. L. Boivin

    E-Print Network [OSTI]

    Lin, Zhihong

    Calibration of the TFTR lost alpha diagnostic R. L. Boivin Plasma Fusion Center, Massachusetts 1992; accepted for publication 7 June 1992) We present various aspects of the calibration of the TFTR-energy ions (MeV range). The first goal of this study was to establish the absolute calibration

  10. Yes, you can control lost and unaccounted-for gas

    SciTech Connect (OSTI)

    Hale, D.

    1984-05-01T23:59:59.000Z

    In 1982, lost and unaccounted-for gas cost the US gas industry $1.983 billion, based on a gas worth of $5.00/1000 CF. A survey of key gas operators across the country produced a list of 23 suggestions for reducing gas losses in the areas of leakage control, measurement practices, accounting accuracy, and theft prevention.

  11. Einstein's lost frame Rodrigo de Abreu and Vasco Guerra

    E-Print Network [OSTI]

    Guerra, Vasco

    Einstein's lost frame Rodrigo de Abreu and Vasco Guerra November 24, 2005 #12;2 #12;Contents 1 Introduction 7 2 Einstein's frame 15 2.1 Space and time . . . . . . . . . . . . . . . . . . . . . . . . . . 15 and Einstein . . . . . . . . . . . . . . . . . . 57 4.2 A formal Galileo transformation

  12. Is security a lost cause? Chris J Mitchell

    E-Print Network [OSTI]

    Sheldon, Nathan D.

    Is security a lost cause? Chris J Mitchell c.mitchell@rhul.ac.uk Information Security Group Royal security, namely: (a) what do current technological trends mean for future information security, and (b) what effect do conflicts between security/privacy requirements and economic and technological pressures

  13. amusic brain lost: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    amusic brain lost First Page Previous Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 doi:10.1093brainawl204 Brain...

  14. PiPe dreams? Jobs Gained, Jobs Lost

    E-Print Network [OSTI]

    Danforth, Bryan Nicholas

    PiPe dreams? Jobs Gained, Jobs Lost by the ConstruCtion of Keystone XL a rePort by Corne, and Induced) Jobs from Keystone XL 26 KXL Will Have Minor Impact on Unemployment Levels 27 Four Ways Keystone to the Keystone XL budget and expenditures, steel sourcing, and the costs of environmental damage. #12;Corne

  15. Geology of the Salt Creek area, Mason County, Texas

    E-Print Network [OSTI]

    Harwood, William Eugene

    1959-01-01T23:59:59.000Z

    USRARy A $ M COLLEQE PP 7DAg GEOIAKY OF THE SALT CREEK ARRA, NASON COUIII'Y, TEXAS A Thesis By WILLI All EOGENE EAR%GOD Subsitted to the Graduate School of the Agricultural asd Nechasical College of Texas is partial iulfillsest... Fornation . ~ . e ~ ~ ~ ~ ~ ~ 19 Hiclrory sandstone nenbsr, Cap Hountain linestone nosher ~. . . 19 Lian Ilountain sandstone nenber . ~ . . ~ . . 19 W libel'ns Forsslt ion . . . ~ ~ ~, ~, ~ Welge sandstone nenbeF . ~ ~ ~ gorgon Creek linestone nsnber...

  16. The geoarchaeology of Buttermilk Creek, Bell County, Texas

    E-Print Network [OSTI]

    Gibson, Brandy Deanne

    1997-01-01T23:59:59.000Z

    THE GEOARCHAEOLOGY OF BUTTERMILK CREEK, BELL COUNTY, TEXAS A Thesis by BRANDY DEANNE GIBSON Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF ARTS... December 1997 Major Subject; Anthropology THE GEOARCHAEOLOGY OF BUTTERMILK CREEK& BELL COUNTY, TEXAS A Thesis by BRANDY DEANNE GIBSON Submitted to Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF ARTS...

  17. Lost River Electric Coop Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:Landowners andLodgepole, Nebraska:LongboardLoretto,Los(RedirectedCreek,

  18. Types of Student Engagement and Commitment to Stream Stewardship: Strawberry Creek on University of California at Berkeley Campus

    E-Print Network [OSTI]

    Javier, Alexander; Jones, Darryl; Tannenbaum, Sara Rose

    2011-01-01T23:59:59.000Z

    participation in urban creek stewardship. p. 243-248. (Re)R. B. 1987. Strawberry Creek Management Plan, website.V.H. 1992. Strawberry Creek on the University of California,

  19. "Indian Rancherie on Dry Creek": An Early 1850s Indian Village on the Sacramento and San Joaquin County Line

    E-Print Network [OSTI]

    Farris, Glenn

    2008-01-01T23:59:59.000Z

    I "Indian Rancherie on Dry Creek": An Early 185Ds IndianIndian Rancherie on Dry Creek." Cahfomia Pictorial Letterimage of the rancheria on Dry Creek with a commentary relat-

  20. An assessment of stream flow and habitat quality for steelhead trout in San Pablo Creek, Contra Costa County

    E-Print Network [OSTI]

    Anderson, Shannah; Maldague, Lorraine

    2004-01-01T23:59:59.000Z

    conditions in lower hayfork creek. http://www.krisweb.com/Comparison of Peak Flow Values Creek Name Method U s e d ton i n g Equation Wildcat Creek Unit Runoff Index Q2=31.05cfs

  1. The Dry Susie Creek Site: Site Structure of Middle Archaic Habitation Features from the Upper Humboldt River Area, Nevada

    E-Print Network [OSTI]

    Smith, Craig S; Reust, Thomas P

    1995-01-01T23:59:59.000Z

    The Archaeology of James Creek Shelter. University of UtahIn: The Archaeology of James Creek Shelter, Robert G. Elston244-266 (1995). The Dry Susie Creek Site: Site Structure of

  2. Saeltzer Dam Removal on Clear Creek 11 years later: An assessment of upstream channel changes since the dam's removal

    E-Print Network [OSTI]

    Simons, Crystal; Walker, Katelyn; Zimring, Mark

    2011-01-01T23:59:59.000Z

    pages. Brown, M. (n.d. ). Clear Creek—McCormick-Saeltzer DamBrown, M. (2011). 2011 Clear Creek Technical Team Report froAssessment: Lower Clear Creek Anadromous Fish Restoration &

  3. A Conceptual Restoration Plan and Tidal Hydrology Assessment for Reconnecting Spring Branch Creek to Suisun Marsh, Solano County, California

    E-Print Network [OSTI]

    Olson, Jessica J.

    2012-01-01T23:59:59.000Z

    for Reconnecting Spring Branch Creek to Suisun Marsh, SolanoFramework CHAPTER 2. SPRING BRANCH CREEK SITE ASSESSMENT 2.1Model for Spring Branch Creek Following Reconnection CHAPTER

  4. 18 years of restoration on Codornices Creek

    E-Print Network [OSTI]

    Fullmer, Chris

    2008-01-01T23:59:59.000Z

    funding for river and stream restoration  projects because 227 Rivers and Streams Restoration  Chris Fullmer  Abstract of river and  stream restoration projects.   Codornices 

  5. Rock Weirs as Tools for Stabilization in Restoration Projects: An appraisal and comparison of two stream restoration projects in Northern California

    E-Print Network [OSTI]

    Ball, Dave; Maendly, Romain; Poindexter, Cristina

    2007-01-01T23:59:59.000Z

    Rosgen, D. 1992. Stream Restoration Plan for Wildcat Creek.investment in stream restoration in the U.S. exceeds $2comparison of two stream restoration projects in Northern

  6. Ecological effects of contaminants and remedial actions in Bear Creek

    SciTech Connect (OSTI)

    Southworth, G.R.; Loar, J.M.; Ryon, M.G.; Smith, J.G.; Stewart, A.J. (Oak Ridge National Lab., TN (United States)); Burris, J.A. (C. E. Environmental, Inc., Tallahassee, FL (United States))

    1992-01-01T23:59:59.000Z

    Ecological studies of the Bear Creek watershed, which drains the area surrounding several Oak Ridge Y-12 Plant waste disposal facilities, were initiated in May 1984 and are continuing at present. These studies consisted of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek, and they were followed by a presently ongoing monitoring phase that involves reduced sampling intensities. The characterization phase utilized two approaches: (1) instream sampling of benthic invertebrate and fish communities in Bear Creek to identify spatial and temporal patterns in distribution and abundance and (2) laboratory bioassays on water samples from Bear Creek and selected tributaries to identify potential sources of toxicity to biota. The monitoring phase of the ecological program relates to the long-term goals of identifying and prioritizing contaminant sources and assessing the effectiveness of remedial actions. It continues activities of the characterization phase at less frequent intervals. The Bear Greek Valley is a watershed that drains the area surrounding several closed Oak Ridge Y-12 Plant waste disposal facilities. Past waste disposal practices in Bear Creek Valley resulted in contamination of Bear Creek and consequent ecological damage. Extensive remedial actions have been proposed at waste sites, and some of the have been implemented or are now underway. The proposed study plan consists of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek in the first year followed by a reduction in sampling intensity during the monitoring phase of the plan. The results of sampling conducted from May 1984 through early 1989 are presented in this report.

  7. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    SciTech Connect (OSTI)

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09T23:59:59.000Z

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).

  8. Lost circulation in geothermal wells: survey and evaluation of industry experience

    SciTech Connect (OSTI)

    Goodman, M.A.

    1981-07-01T23:59:59.000Z

    Lost circulation during drilling and completion of geothermal wells can be a severe problem, particularly in naturally fractured and/or vugular formations. Geothermal and petroleum operators, drilling service companies, and independent consultants were interviewed to assess the lost circulation problem in geothermal wells and to determine general practices for preventing lost circulation. This report documents the results and conclusions from the interviews and presents recommendations for needed research. In addition, a survey was also made of the lost circulation literature, of currently available lost circulation materials, and of existing lost circulation test equipment.

  9. Examination of eastern oil shale disposal problems - the Hope Creek field study

    SciTech Connect (OSTI)

    Koppenaal, D.W.; Kruspe, R.R.; Robl, T.L.; Cisler, K.; Allen, D.L.

    1985-02-01T23:59:59.000Z

    A field-based study of problems associated with the disposal of processed Eastern oil shale was initiated in mid-1983 at a private research site in Montgomery County, Kentucky. The study (known as the Hope Creek Spent Oil Shale Disposal Project) is designed to provide information on the geotechnical, revegetation/reclamation, and leachate generation and composition characteristics of processed Kentucky oil shales. The study utilizes processed oil shale materials (retorted oil shale and reject raw oil shale fines) obtained from a pilot plant run of Kentucky oil shale using the travelling grate retort technology. Approximately 1000 tons of processed oil shale were returned to Kentucky for the purpose of the study. The study, composed of three components, is described. The effort to date has concentrated on site preparation and the construction and implementation of the field study research facilities. These endeavors are described and the project direction in the future years is defined.

  10. Assess Current and Potential Salmonid Production in Rattlesnake Creek in Association with Restoration Efforts, US Geological Survey Report, 2004-2005 Annual Report.

    SciTech Connect (OSTI)

    Allen, M. Brady; Connolly, Patrick J.; Jezorek, Ian G. (US Geological Survey, Western Fisheries Research Center, Columbia River Research Laboratory, Cook, WA)

    2006-06-01T23:59:59.000Z

    This project was designed to document existing habitat conditions and fish populations within the Rattlesnake Creek watershed (White Salmon River subbasin, Washington) before major habitat restoration activities are implemented and prior to the reintroduction of salmon and steelhead above Condit Dam. Returning adult salmon Oncorhynchus spp. and steelhead O. mykiss have not had access to Rattlesnake Creek since 1913. An assessment of resident trout populations should serve as a good surrogate for evaluation of factors that would limit salmon and steelhead production in the watershed. Personnel from United States Geological Survey's Columbia River Research Laboratory (USGS-CRRL) attended to three main objectives of the Rattlesnake Creek project. The first objective was to characterize stream and riparian habitat conditions. This effort included measures of water quality, water quantity, stream habitat, and riparian conditions. The second objective was to determine the status of fish populations in the Rattlesnake Creek drainage. To accomplish this, we derived estimates of salmonid population abundance, determined fish species composition, assessed distribution and life history attributes, obtained tissue samples for genetic analysis, and assessed fish diseases in the watershed. The third objective was to use the collected habitat and fisheries information to help identify and prioritize areas in need of restoration. As this report covers the fourth year of a five-year study, it is largely restricted to describing our efforts and findings for the first two objectives.

  11. The feasibility of residential development in the newly master planned Ship Creek area of Anchorage, Alaska

    E-Print Network [OSTI]

    Debenham, Shaun T. (Shaun Todd), 1973-

    2004-01-01T23:59:59.000Z

    The aim of this thesis is to determine if a 40 unit condominium complex located in the Ship Creek area in Anchorage, Alaska, is financially feasible. Historically, Ship Creek has been an industrial area but recently the ...

  12. EA-1219: Hoe Creek Underground Coal Gasification Test Site Remediation, Campbell County, Wyoming

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposed Hoe Creek Underground Coal Gasification Test Site Remediation that would be performed at the Hoe Creek site in Campbell County, Wyoming.

  13. Recurrent faulting and petroleum accumulation, Cat Creek Anticline, central Montana

    SciTech Connect (OSTI)

    Nelson, W.J. (Illinois State Geological Survey, Champaign (United States))

    1991-06-01T23:59:59.000Z

    The Cat Creek anticline, scene of central Montana's first significant oil discovery, is underlain by a south-dipping high-angle fault (Cat Creek fault) that has undergone several episodes of movement with opposite sense of displacement. Borehole data suggest that the Cat Creek fault originated as a normal fault during Proterozoic rifting concurrent with deposition of the Belt Supergroup. Reverse faulting took place in Late Cambrian time, and again near the end of the Devonian Period. The Devonian episode, coeval with the Antler orogeny, raised the southern block several hundred feet. The southern block remained high through Meramecian time, then began to subside. Post-Atokan, pre-Middle Jurassic normal faulting lowered the southern block as much as 1,500 ft. During the Laramide orogeny (latest Cretaceous-Eocene) the Cat Creek fault underwent as much as 4,000 ft of reverse displacement and a comparable amount of left-lateral displacement. The Cat Creek anticline is a fault-propagation fold; en echelon domes and listric normal faults developed along its crest in response to wrenching. Oil was generated mainly in organic-rich shales of the Heath Formation (upper Chesterian Series) and migrated upward along tectonic fractures into Pennsylvanian, Jurassic, and Cretaceous reservoir rocks in structural traps in en echelon domes. Production has been achieved only from those domes where structural closure was retained from Jurassic through Holocene time.

  14. North Fork John Day Dredge Tailings Restoration Project Final Report 1997-2002.

    SciTech Connect (OSTI)

    Sanchez, John A. (US Forest Service, Pendleton, OR)

    2002-12-01T23:59:59.000Z

    The USDA Forest Service (USFS) and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) worked together to rehabilitate 2.1 miles of Clear Creek floodplain, a tributary of the North Fork John Day River Basin. Dredge tailing were deposited from mining operations on Clear Creek's floodplain from the 1930's to the 1950's. These tailing confined the stream channel and degraded the floodplain. The work was completed by moving dredge tailing piles adjacent to the Clear Creek channel, using track-mounted excavators and dump trucks. A caterpillar tractor was used to contour the material placed outside the immediate floodplain, blending it into the hillside. The restored floodplain was very near channel bankfull level following excavation and contoured to accept future flood flows. Monitoring was initiated through pre and post-project photo points and cross-section measurements. Work was completed in two efforts. In 1997 and 1998 floodplain restoration was adjacent to the reconstruction of Road 13 from the junction with Road 10 from Clear Creek River Mile 1.9 to 3.1 for a distance of 1.2 miles. In 1999 the Environmental Assessment for Lower Clear Creek--Granite Creek Floodplain Restoration Project was completed for work proposed on Clear Creek from the mouth up to River mile 1.9 and the Granite Creek floodplain from River miles 5.9 to 7.7. Restoration proposed in the 1999 Environmental Assessment is the subject of this report.

  15. Analysis of geothermal electric-power generation at Big Creek Hot Springs, Lemhi County, Idaho

    SciTech Connect (OSTI)

    Struhsacker, D.W. (ed.)

    1981-01-01T23:59:59.000Z

    Big Creek Hot Springs was evaluated as a source of electrical power for the Blackbird Cobalt Mine, approximately 13 miles south of the hot spring. An evaluaton of the geothermal potential of Big Creek Hot Springs, a suggested exploration program and budget, an engineering feasibility study of power generation at Big Creek Hot Springs, an economic analysis of the modeled power generating system, and an appraisal of the institutional factors influencing development at Big Creek Hot Springs are included.

  16. Workers at Paducah Site Exceed 1.5 Million Hours Without Lost...

    Office of Environmental Management (EM)

    at Paducah Site Exceed 1.5 Million Hours Without Lost-Time Injury, Illness Workers at Paducah Site Exceed 1.5 Million Hours Without Lost-Time Injury, Illness October 30, 2014 -...

  17. Recovery of the lost individual: a Deweyan examination of individuality and community 

    E-Print Network [OSTI]

    Pope, Nakia S

    1999-01-01T23:59:59.000Z

    In 1929 - 1930, John Dewey wrote a series of essays which became the work "Individualism Old and New.'' In this work, he describes a type of individual which he terms "lost.'' The lost individual is disconnected, disoriented, and disassociated...

  18. Inorganic water chemistry 71 Chapter 4 -Inorganic Water Chemistry of the Boulder Creek

    E-Print Network [OSTI]

    Inorganic water chemistry 71 Chapter 4 - Inorganic Water Chemistry of the Boulder Creek Watershed Creek Watershed, Colorado were determined on a suite of water samples collected during high and low flow sixteen stream sites, twelve tributaries/inflows, and Saint Vrain Creek. The most upstream site was above

  19. CHEMICAL AND HYDROLOGIC DATA FROM THE CEMENT CREEK AND UPPER ANIMAS RIVER CONFLUENCE AND

    E-Print Network [OSTI]

    CHEMICAL AND HYDROLOGIC DATA FROM THE CEMENT CREEK AND UPPER ANIMAS RIVER CONFLUENCE AND MIXING.S. Geological Survey #12;CHEMICAL AND HYDROLOGIC DATA FROM THE CEMENT CREEK AND UPPER ANIMAS RIVER CONFLUENCE.H., Schemel, L.E., 2007, Chemical and hydrologic data form the Cement Creek and upper Animas River confluence

  20. Roberts Creek Study Forest: the effects of shelterwood harvesting and blowdown

    E-Print Network [OSTI]

    is sediment produc- tion in domestic water supply creeks. The effects of timber harvesting on sedimentRoberts Creek Study Forest: the effects of shelterwood harvesting and blowdown on sediment production in a small zero-order creek by Robert O. Hudson and Brian D'Anjou KEYWORDS: Shelterwood harvest

  1. Fast-growing willow shrub named `Fish Creek`

    SciTech Connect (OSTI)

    Abrahamson, Lawrence P.; Kopp, Richard F.; Smart, Lawrence B.; Volk, Timothy A.

    2007-05-08T23:59:59.000Z

    A distinct male cultivar of Salix purpurea named `Fish Creek`, characterized by rapid stem growth producing greater than 30% more woody biomass than either of its parents (`94001` and `94006`) and 20% more biomass than a current production cultivar (`SV1`). `Fish Creek` can be planted from dormant stem cuttings, produces multiple stems after coppice, and the stem biomass can be harvested when the plant is dormant. In the spring following harvest, the plant will re-sprout very vigorously, producing new stems that can be harvested after two to four years of growth. This harvest cycle can be repeated several times. The stem biomass can be chipped and burned as a source of renewable energy, generating heat and/or electricity. `Fish Creek` displays a low incidence of rust disease or damage by beetles or sawflies.

  2. Fast-growing willow shrub named `Fish Creek`

    DOE Patents [OSTI]

    Abrahamson, Lawrence P.; Kopp, Richard F.; Smart, Lawrence B.; Volk, Timothy A.

    2007-05-08T23:59:59.000Z

    A distinct male cultivar of Salix purpurea named `Fish Creek`, characterized by rapid stem growth producing greater than 30% more woody biomass than either of its parents (`94001` and `94006`) and 20% more biomass than a current production cultivar (`SV1`). `Fish Creek` can be planted from dormant stem cuttings, produces multiple stems after coppice, and the stem biomass can be harvested when the plant is dormant. In the spring following harvest, the plant will re-sprout very vigorously, producing new stems that can be harvested after two to four years of growth. This harvest cycle can be repeated several times. The stem biomass can be chipped and burned as a source of renewable energy, generating heat and/or electricity. `Fish Creek` displays a low incidence of rust disease or damage by beetles or sawflies.

  3. Exploration of the Upper Hot Creek Ranch Geothermal Resource, Nye County, Nevada

    SciTech Connect (OSTI)

    Dick Benoit; David Blackwell

    2006-01-01T23:59:59.000Z

    The Upper Hot Creek Ranch (UHCR) geothermal system had seen no significant exploration activity prior to initiation of this GRED III project. Geochemical geothermometers calculated from previously available but questionable quality analyses of the UHCR hot spring waters indicated possible subsurface temperatures of +320 oF. A complex Quaternary and Holocene faulting pattern associated with a six mile step over of the Hot Creek Range near the UHCR also indicated that this area was worthy of some exploration activity. Permitting activities began in Dec. 2004 for the temperature-gradient holes but took much longer than expected with all drilling permits finally being received in early August 2005. The drilling and geochemical sampling occurred in August 2005. Ten temperature gradient holes up to 500’ deep were initially planned but higher than anticipated drilling and permitting costs within a fixed budget reduced the number of holes to five. Four of the five holes drilled to depths of 300 to 400’ encountered temperatures close to the expected regional thermal background conditions. These four holes failed to find any evidence of a large thermal anomaly surrounding the UHCR hot springs. The fifth hole, located within a narrow part of Hot Creek Canyon, encountered a maximum temperature of 81 oF at a depth of 105’ but had cooler temperatures at greater depth. Temperature data from this hole can not be extrapolated to greater depths. Any thermal anomaly associated with the UHCR geothermal system is apparently confined to the immediate vicinity of Hot Creek Canyon where challenges such as topography, a wilderness study area, and wetlands issues will make further exploration time consuming and costly. Ten water samples were collected for chemical analysis and interpretation. Analyses of three samples of the UHCR thermal give predicted subsurface temperatures ranging from 317 to 334 oF from the Na-K-Ca, silica (quartz), and Na-Li geothermometers. The fact that all three thermometers closely agree gives the predictions added credibility. Unfortunately, the final result of this exploration is that a moderate temperature geothermal resource has been clearly identified but it appears to be restricted to a relatively small area that would be difficult to develop.

  4. Identification and characterization of wetlands in the Bear Creek watershed

    SciTech Connect (OSTI)

    Rosensteel, B.A. [JAYCOR, Oak Ridge, TN (United States); Trettin, C.C. [Oak Ridge National Lab., TN (United States)

    1993-10-01T23:59:59.000Z

    The primary objective of this study was to identify, characterize, and map the wetlands in the Bear Creek watershed. A preliminary wetland categorization system based on the Cowardin classification system (Cowardin et al. 1979) with additional site-specific topographic, vegetation, and disturbance characteristic modifiers was developed to characterize the type of wetlands that exist in the Bear Creek watershed. An additional objective was to detect possible relationships among site soils, hydrology, and the occurrence of wetlands in the watershed through a comparison of existing data with the field survey. Research needs are discussed in the context of wetland functions and values and regulatory requirements for wetland impact assessment and compensatory mitigation.

  5. On the cost of lost production from Russian oil fields

    SciTech Connect (OSTI)

    Smith, J.L. [Univ. of Houston, TX (United States)

    1995-12-31T23:59:59.000Z

    Russia is now paying heavily for past mismanagement of its major oil fields. Unconventional attempts to maximize short-run extraction, neglect of routine maintenance, and shortages of critical equipment have combined to cause a steep decline in production. This study examines the scope and size of resulting economic losses using an extension of the traditional exponential decline model. Estimates derived from the model indicate that as much as 40% of the potential value of Russian oil reserves has been lost through poor management. 20 refs., 8 figs., 5 tabs.

  6. Improvement of the Lost Foam Casting Process | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(Fact Sheet),EnergyImprovement of the Lost Foam Casting Process Improvement of

  7. Codornices Creek Corridor: Land Use Regulation, Creek Restoration, and their Impacts on the Residents’ Perceptions

    E-Print Network [OSTI]

    Stokenberga, Aiga; Sen, Arijit

    2013-01-01T23:59:59.000Z

    Two East Bay Urban Stream Restoration Projects: Codornicesfunding for river and stream restoration projects, becausepreservation, and restoration of urban streams and their

  8. Tillman Creek Mitigation Site As-Build Report.

    SciTech Connect (OSTI)

    Gresham, Doug [Otak, Inc.

    2009-05-29T23:59:59.000Z

    This as-built report describes site conditions at the Tillman Creek mitigation site in South Cle Elum, Washington. This mitigation site was constructed in 2006-2007 to compensate for wetland impacts from the Yakama Nation hatchery. This as-built report provides information on the construction sequence, as-built survey, and establishment of baseline monitoring stations.

  9. Ventilation planning at Energy West's Deer Creek mine

    SciTech Connect (OSTI)

    Tonc, L.; Prosser, B.; Gamble, G. [Pacific Corp., Huntington, UT (United States)

    2009-08-15T23:59:59.000Z

    In 2004 ventilation planning was initiated to exploit a remote area of Deer Creek mine's reserve (near Huntington, Utah), the Mill Fork Area, located under a mountain. A push-pull ventilation system was selected. This article details the design process of the ventilation system upgrade, the procurement process for the new fans, and the new fan startup testing. 5 figs., 1 photo.

  10. Okanogan Focus Watershed Salmon Creek : Annual Report 1999.

    SciTech Connect (OSTI)

    Lyman, Hilary

    1999-11-01T23:59:59.000Z

    During FY 1999 the Colville Tribes and the Okanogan Irrigation District (OID) agreed to study the feasibility of restoring and enhancing anadromous fish populations in Salmon Creek while maintaining the ability of the district to continue full water service delivery to it members.

  11. Status and Monitoring of Natural and Supplemented Chinook Salmon in Johnson Creek, Idaho, 2006-2007 Annual Report.

    SciTech Connect (OSTI)

    Rabe, Craig D.; Nelson, Douglas D. [Nez Perce Tribe

    2008-11-17T23:59:59.000Z

    The Nez Perce Tribe Johnson Creek Artificial Propagation Enhancement Project (JCAPE) has conducted juvenile and adult monitoring and evaluation studies for its 10th consecutive year. Completion of adult and juvenile Chinook salmon studies were conducted for the purpose of evaluating a small-scale production initiative designed to increase the survival of a weak but recoverable spawning aggregate of summer Chinook salmon Oncorhynchus tshawytscha. The JCAPE program evaluates the life cycle of natural origin (NOR) and hatchery origin (HOR) supplementation fish to quantify the key performance measures: abundance, survival-productivity, distribution, genetics, life history, habitat, and in-hatchery metrics. Operation of a picket style weir and intensive multiple spawning ground surveys were completed to monitor adult Chinook salmon and a rotary screw trap was used to monitor migrating juvenile Chinook salmon in Johnson Creek. In 2007, spawning ground surveys were conducted on all available spawning habitat in Johnson Creek and one of its tributaries. A total of 63 redds were observed in the index reach and 11 redds for all other reaches for a combined count of 74 redds. Utilization of carcass recovery surveys and adult captures at an adult picket weir yielded a total estimated adult escapement to Johnson Creek of 438 Chinook salmon. Upon deducting fish removed for broodstock (n=52), weir mortality/ known strays (n=12), and prespawning mortality (n=15), an estimated 359 summer Chinook salmon were available to spawn. Estimated total migration of brood year 2005 NOR juvenile Chinook salmon at the rotary screw trap was calculated for three seasons (summer, fall, and spring). The total estimated migration was 34,194 fish; 26,671 of the NOR migrants left in the summer (July 1 to August 31, 2005) as fry/parr, 5,852 left in the fall (September 1 to November 21, 2005) as presmolt, and only 1,671 NOR fish left in the spring (March 1 to June 30, 2006) as smolt. In addition, there were 120,415 HOR supplementation smolts released into Johnson Creek during the week of March 12, 2007. Life stage-specific juvenile survival from Johnson Creek to Lower Granite and McNary dams was calculated for brood year 2005 NOR and HOR supplementation juvenile Chinook salmon. Survival of NOR parr Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 28.2% and 16.2%. Survival of NOR presmolt Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 28.2% and 22.3%. Survival of NOR smolt Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 44.7% and 32.9%. Survival of HOR smolt Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 31.9% and 26.2%. Multi-year analysis on smolt to adult return rate's (SAR's) and progeny to parent ratio's (P:P's) were calculated for NOR and HOR supplementation Brood Year 2002 Chinook salmon. SAR's were calculated from Johnson Creek to Johnson Creek (JC to JC), Lower Granite Dam to Lower Granite (LGD to LGD), and Lower Granite Dam to Johnson Creek (LGD to JC); for NOR fish SAR's were 0.16%, 1.16% and 1.12%, while HOR supplementation SAR's from JC to JC, LGD to LGD and LGD to JC were 0.04%, 0.19% and 0.13%. P:P's for all returning NOR and HOR supplemented adults were under replacement levels at 0.13 and 0.65, respectively. Recruit per spawner estimates (R/S) for Brood Year 2005 adult Chinook salmon were also calculated for NOR and HOR supplemented Chinook salmon at JC and LGD. R/S estimates for NOR and HOR supplemented fish at JC were 231 and 1,745, while R/S estimates at LGD were 67 and 557. Management recommendations address (1) effectiveness of data collection methods, (2) sufficiency of data quality (statistical power) to enable management recommendations, (3) removal of uncertainty and subsequent cessation of M&E activities, and (4) sufficiency of findings for program modifications prior to five-year review.

  12. Subsidence prediction for two UCG projects

    SciTech Connect (OSTI)

    Sutherland, H.J.

    1984-01-01T23:59:59.000Z

    The movement of strata overlying two UCG projects is calculated using analyses that have been developed for the prediction of subsidence above coal mines. The techniques are used to analyse the Hoe Creek 3 burn and the forthcoming TONO project partial seam test. The application to the Hoe Creek case is straightforward because the cavity shape is known, but application to the TONO project required the estimation of the lateral extent of the cavity. The estimates use the projected quantity of coal to be removed and two scenarios for the burn sequence. The subsidence analyses are combined with the anticipated pattern of coal removal to place an upper boundary on the surface subsidence that can be expected at the TONO site.

  13. Abundance, Behavior, and Habitat Utilization by Coho Salmon and Steelhead Trout in Fish Creek, Oregon, as Influenced by Habitat Enhancement, 1985 Annual Report.

    SciTech Connect (OSTI)

    Wolfe, John (Mount Hood National Forest, Clackamas River Ranger District, Estacada, OR); Everest, Fred H. (Oregon State University, Pacific Northwest Forest and Range Experiment Station, Corvallis, OR); Heller, David A. (Mount Hood National Forest, Gresham, OR)

    1986-09-01T23:59:59.000Z

    Construction and evaluation of salmonid habitat improvements on Fish Creek, a tributary of the upper Clackamas River, was continued in fiscal year 1985 by the Estacada Ranger District, Mt. Hood National Forest, and the Anadromous Fish Habitat Research Unit of the Pacific Northwest Forest and Range Experiment Station (PNW), USDA Forest Service. The study began in 1982 when PNW entered into an agreement with the Mt. Hood National Forest to evaluate fish habitat improvements in the Fish Creek basin on the Estacada Ranger District. The project was initially conceived as a 5-year effort (19824986) to be financed by Forest Service funds. Several factors limiting production of salmonids in the basin were identified during the first year of the study, and the scope of the habitat improvement effort was subsequently enlarged. The habitat improvement program and the evaluation of improvements were both expanded in mid-1983 when the Bonneville Power Administration entered into an agreement with the Mt. Hood National Forest to provide additional funding for work on Fish Creek. Habitat improvement work in the basin is designed to increase the annual number of chinook and coho salmon, and steelhead trout smolt outmigrants. The primary objectives of the evaluation include the: (1) Evaluation and quantification of changes in salmonid spawning and rearing habitat resulting from a variety of habitat Improvements. (2) Evaluation and quantification of changes in fish populations and biomass resulting from habitat improvements. (3) Evaluation of the cost-effectiveness of habitat improvements developed with BPA and Forest Service funds on Fish Creek. Several prototype enhancement projects were constructed and tested during the first three years of the study. The Intention was to identify successful techniques that could then be broadly applied within the bash. This stepwise procedure has been largely successful in identifying the most promising enhancement techniques for the Fish Creek basin. To date, 7-10 percent of the habitat area in the basin has been treated. When work on Fish Creek is completed, it is estimated that 50-60 percent of the total habitat area used by anadromous salmonids will have received some form of treatment. This annual progress report will focus on the projects completed in the basin In 1983, 1984, and 1985, and their evaluation. Winter habitat use and coho salmon and steelhead trout smolt production will also be emphasized.

  14. BACA Project: geothermal demonstration power plant. Final report

    SciTech Connect (OSTI)

    Not Available

    1982-12-01T23:59:59.000Z

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  15. Wanderl[o]st: Lost Identities and Losing Place in the New World (Dis)Order

    E-Print Network [OSTI]

    Whitney, Kendall Abbott

    2009-04-22T23:59:59.000Z

    in the margins as lost subjects. The battle that they wage is with their ideals that, in turn, are the cause of their struggles with society. In this sense, I use the term ?loser? endearingly, because failure is infinitely more provocative than success while.... The consequences of being lost are dire but it does not appear that the lost subjects and losers make great efforts to ?find? themselves or ?win.? I hypothesize that one big reason for the desire?or the lust?for wandering, getting lost, is the desire to lose one...

  16. Early cavity growth during forward burn. [Hoe Creek III problems

    SciTech Connect (OSTI)

    Shannon, M.J.; Thorsness, C.B.; Hill, R.W.

    1980-07-03T23:59:59.000Z

    During the early portion of the forward burn phase of the Hoe Creek III field experiment, the cavity progagated rapidly down the deviated borehole and to the top of the coal seam. As a first step to understanding this phenomena we have conducted small scale coal block experiments. Drying as well as combustion tests were performed. This paper describes the test hardware and the experimental results.

  17. Willow Creek Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1 Wind Project Jump to: navigation,Williamsport, Indiana:Willow

  18. Wolverine Creek Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1 Wind Project JumpWisconsin: Energy Resources

  19. Dry Creek salt dome, Mississippi Interior Salt basin

    SciTech Connect (OSTI)

    Montgomery, S.L.; Ericksen, R.L.

    1997-03-01T23:59:59.000Z

    Recent drilling of salt dome flanks in the Mississippi Salt basin has resulted in important new discoveries and the opening of a frontier play. This play is focused on gas/condensate reserves in several Cretaceous formations, most notably the Upper Cretaceous Eutaw and lower Tuscaloosa intervals and Lower Cretaceous Paluxy and Hosston formations. As many as eight domes have been drilled thus far; sandstones in the upper Hosston Formation comprise the primary target. Production has been as high as 3-5 Mcf and 500-1200 bbl of condensate per day, with estimated ultimate reserves in the range of 0.2 to 1.5 MBOE (million barrels oil equivalent) per well. As typified by discovery at Dry Creek salt dome, traps are related to faulting, unconformities, and updip loss of permeability. Previous drilling at Dry Creek, and in the basin generally, avoided the flank areas of most domes, due to geologic models that predicted latestage (Tertiary) piercement and breached accumulations. Recent data from Dry Creek and other productive domes suggest that growth was episodic and that piercement of Tertiary strata did not affect deeper reservoirs charged with hydrocarbons in the Late Cretaceous.

  20. Big Bang Day : Afternoon Play - Torchwood: Lost Souls

    ScienceCinema (OSTI)

    None

    2011-04-25T23:59:59.000Z

    Martha Jones, ex-time traveller and now working as a doctor for a UN task force, has been called to CERN where they're about to activate the Large Hadron Collider. Once activated, the Collider will fire beams of protons together recreating conditions a billionth of a second after the Big Bang - and potentially allowing the human race a greater insight into what the Universe is made of. But so much could go wrong - it could open a gateway to a parallel dimension, or create a black hole - and now voices from the past are calling out to people and scientists have started to disappear... Where have the missing scientists gone? What is the secret of the glowing man? What is lurking in the underground tunnel? And do the dead ever really stay dead? Lost Souls is a spin-off from the award-winning BBC Wales TV production Torchwood. It stars John Barrowman, Freema Agyeman, Eve Myles, Gareth David-Lloyd, Lucy Montgomery (of Titty Bang Bang) and Stephen Critchlow.

  1. Big Bang Day : Afternoon Play - Torchwood: Lost Souls

    SciTech Connect (OSTI)

    None

    2009-10-13T23:59:59.000Z

    Martha Jones, ex-time traveller and now working as a doctor for a UN task force, has been called to CERN where they're about to activate the Large Hadron Collider. Once activated, the Collider will fire beams of protons together recreating conditions a billionth of a second after the Big Bang - and potentially allowing the human race a greater insight into what the Universe is made of. But so much could go wrong - it could open a gateway to a parallel dimension, or create a black hole - and now voices from the past are calling out to people and scientists have started to disappear... Where have the missing scientists gone? What is the secret of the glowing man? What is lurking in the underground tunnel? And do the dead ever really stay dead? Lost Souls is a spin-off from the award-winning BBC Wales TV production Torchwood. It stars John Barrowman, Freema Agyeman, Eve Myles, Gareth David-Lloyd, Lucy Montgomery (of Titty Bang Bang) and Stephen Critchlow.

  2. Energy Saving Melting and Revert Reduction Technology (Energy SMARRT): Manufacturing Advanced Engineered Components Using Lost Foam Casting Technology

    SciTech Connect (OSTI)

    Harry Littleton; John Griffin

    2011-07-31T23:59:59.000Z

    This project was a subtask of Energy Saving Melting and Revert Reduction Technology (�¢����Energy SMARRT�¢���) Program. Through this project, technologies, such as computer modeling, pattern quality control, casting quality control and marketing tools, were developed to advance the Lost Foam Casting process application and provide greater energy savings. These technologies have improved (1) production efficiency, (2) mechanical properties, and (3) marketability of lost foam castings. All three reduce energy consumption in the metals casting industry. This report summarizes the work done on all tasks in the period of January 1, 2004 through June 30, 2011. Current (2011) annual energy saving estimates based on commercial introduction in 2011 and a market penetration of 97% by 2020 is 5.02 trillion BTU�¢����s/year and 6.46 trillion BTU�¢����s/year with 100% market penetration by 2023. Along with these energy savings, reduction of scrap and improvement in casting yield will result in a reduction of the environmental emissions associated with the melting and pouring of the metal which will be saved as a result of this technology. The average annual estimate of CO2 reduction per year through 2020 is 0.03 Million Metric Tons of Carbon Equivalent (MM TCE).

  3. Assessment of Water Resources and Watershed Conditions in Moores Creek National Battlefield, North Carolina

    E-Print Network [OSTI]

    Mallin, Michael

    Assessment of Water Resources and Watershed Conditions in Moores Creek National Battlefield, North Assessment of Park Water Resources.......................................................................25 resources........................................................................15 Biological resources

  4. Microsoft Word - 2012_Rapid_Lightening_Creek_Easement_CX_Rev2...

    Broader source: Energy.gov (indexed) [DOE]

    Manager - KEWM-4 Proposed Action: AMENDED Provision of funds to the Idaho Department of Fish and Game (IDFG) to purchase the Rapid Lightning Creek Property. Fish and Wildlife...

  5. Moab Project Exceeds 5 Years of Operations Without Lost-Time Injury,

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagement of the National 93-4EnergyMissionIllness | Department of

  6. Moab Project Logs 2 Million Work Hours Without Lost-Time Injury or Illness

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagement of the National 93-4EnergyMissionIllness | Department of|

  7. Assessment of net lost revenue adjustment mechanisms for utility DSM programs

    SciTech Connect (OSTI)

    Baxter, L.W.

    1995-01-01T23:59:59.000Z

    Utility shareholders can lose money on demand-side management (DSM) investments between rate cases. Several industry analysts argue that the revenues lost from utility DSM programs are an important financial disincentive to utility DSM investment. A key utility regulatory reform undertaken since 1989 allows utilities to recover the lost revenues incurred through successful operation of DSM programs. Explicitly defined net lost revenue adjustment (NLRA) mechanisms are states` preferred approach to lost revenue recovery from DSM programs. This report examines the experiences states and utilities are having with the NLRA approach. The report has three objectives. First, we determine whether NLRA is a feasible and successful approach to removing the lost-revenue disincentive to utility operation of DSM programs. Second, we identify the conditions linked to successful implementation of NLRA mechanisms in different states and assess whether NLRA has changed utility investment behavior. Third, we suggest improvements to NLRA mechanisms. We first identify states with NLRA mechanisms where utilities are recovering lost revenues from DSM programs. We interview staff at regulatory agencies in all these states and utility staff in four states. These interviews focus on the status of NLRA, implementation issues, DSM measurement issues, and NLRA results. We also analyze regulatory agency orders on NLRA, as well as associated testimony, reports, and utility lost revenue recovery filings. Finally, we use qualitative and quantitative indicators to assess NLRA`s effectiveness. Contrary to the concerns raised by some industry analysts, our results indicate NLRA is a feasible approach to the lost-revenue disincentive.

  8. A Probabilistic Water Resources Assessment of the Paradise Creek Watershed Presented in Partial Fulfillment of the Requirements for the

    E-Print Network [OSTI]

    Fiedler, Fritz R.

    A Probabilistic Water Resources Assessment of the Paradise Creek Watershed A Thesis Presented Probabilistic Water Resources Assessment of the Paradise Creek Watershed," has been reviewed in final form ____________________________________Date____________ Margrit von Braun #12;iii iii A Probabilistic Water Resources Assessment

  9. DOE EM Project Experience & Lessons Learned for In Situ Decommissionin...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    funding profiles for the foreseeable future, the potential exists for this institutional knowledge to be lost as the ramp-down of project staffing commences with the cessation of...

  10. Energy-Saving Melting and Revert Reduction Technology (E-SMARRT): Lost Foam Thin Wall - Feasibility of Producing Lost Foam Castings in Aluminum and Magnesium Based Alloys

    SciTech Connect (OSTI)

    Fasoyinu, Yemi [CanmetMATERIALS] [CanmetMATERIALS; Griffin, John A. [University of Alabama - Birmingham] [University of Alabama - Birmingham

    2014-03-31T23:59:59.000Z

    With the increased emphasis on vehicle weight reduction, production of near-net shape components by lost foam casting will make significant inroad into the next-generation of engineering component designs. The lost foam casting process is a cost effective method for producing complex castings using an expandable polystyrene pattern and un-bonded sand. The use of un-bonded molding media in the lost foam process will impose less constraint on the solidifying casting, making hot tearing less prevalent. This is especially true in Al-Mg and Al-Cu alloy systems that are prone to hot tearing when poured in rigid molds partially due to their long freezing range. Some of the unique advantages of using the lost foam casting process are closer dimensional tolerance, higher casting yield, and the elimination of sand cores and binders. Most of the aluminum alloys poured using the lost foam process are based on the Al-Si system. Very limited research work has been performed with Al-Mg and Al-Cu type alloys. With the increased emphasis on vehicle weight reduction, and given the high-strength-to-weight-ratio of magnesium, significant weight savings can be achieved by casting thin-wall (? 3 mm) engineering components from both aluminum- and magnesium-base alloys.

  11. A SECOND LOOK AT THE SAFETY EFFECTIVENESS OF THE MYRTLE CREEK ADVANCED CURVE WARNING SYSTEM

    E-Print Network [OSTI]

    Bertini, Robert L.

    -1- A SECOND LOOK AT THE SAFETY EFFECTIVENESS OF THE MYRTLE CREEK ADVANCED CURVE WARNING SYSTEM as the "Myrtle Creek Curves." This location consists of a series of curves which have continually been a notable. The curves are located in a 50 mile per hour (mph) speed zone and are posted with an advisory speed of 45 mph

  12. Ice Climbing in Clear Creek Canyon A climbing trip report by Glenn Murray

    E-Print Network [OSTI]

    Ice Climbing in Clear Creek Canyon A climbing trip report by Glenn Murray SUMMARY: I climb ice in to ask about local climbing. The guys there told me there was ice nearby, in Clear Creek Canyon. I. Four pitches? Five? It was time to find a partner. The only ice climber I knew in Denver was a friend

  13. Explores Dam Removal Located in Southwest Ohio, Buck Creek and its

    E-Print Network [OSTI]

    Bogaerts, Steven

    OHIO Researcher Explores Dam Removal Located in Southwest Ohio, Buck Creek and its tributary, Beaver Creek, run through a series of low-head dams in Springfield, Ohio. Historically, the four dams of the four dams. This will help restore the natural flow of sediments and fish along the entire river

  14. An analysis of energy expenditure in Goodwin Creek Peter Molnar and Jorge A. Ramirez

    E-Print Network [OSTI]

    RamĂ­rez, Jorge A.

    An analysis of energy expenditure in Goodwin Creek Peter Molna´r and Jorge A. Rami´rez Department with recent observations of channel change in Goodwin Creek. This energy expenditure analysis suggests of energy dissipation per unit channel area, Pa, is constant throughout the river network is explored

  15. Brushy Creek, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainable and InnovativeBrookmont,Florida: EnergyVirginia:Brushy Creek,

  16. Burnt Creek-Riverview, North Dakota: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainable andBucoda,Burke County,Information Burnt Creek-Riverview,

  17. Hunters Creek, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty, Texas: Energy Resources Jump to:Hunter,Creek, Florida:

  18. Pebble Creek, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri:EnergyOssian,Parle Biscuits PvtPawPearland, Texas: EnergyPebble Creek,

  19. Pike Creek, Delaware: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal PwerPerkins County, Nebraska: Energy ResourcesPicket Lake,Hampshire:Illinois:62363°,Ohio:Creek,

  20. Indian Creek, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty,Jump7 Varnish cacheTransport and BuildingCreek, Florida:

  1. Smith Creek Valley Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f < RAPID‎ |RippeyInformation SlimSloughCreek Geothermal

  2. Grape Creek, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG Contracting JumpGoveNebraska: Energy ResourcesSouth,Grape Creek,

  3. Swartz Creek, Michigan: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries PvtStratosolar Jump to:Holdings Co LtdLLC Place:Svartsengi GeothermalSwartz Creek,

  4. Big Creek Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon,Belcher Homes JumpMaintenance |Big Creek Hot Springs

  5. Birch Creek Village Elec Util | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon,Belcher HomesLyonsBirch Creek Village Elec Util Jump to:

  6. LaCreek Electric Assn, Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |Jilin Zhongdiantou NewKorea PartsLLNL Energy FlowLODLPKFLaLaCreek

  7. Workplace Charging Challenge Partner: ClipperCreek, Inc. | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: SinceDevelopment | Department ofPartnershipsAngieTerriDepartment ofEnergy ClipperCreek, Inc.

  8. Barton Creek, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomass Conversions Inc JumpIMBarnard,Barrow County,Kansas: EnergyCreek, Texas:

  9. Bear Creek, Alaska: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomass Conversions IncBay County, Florida:Tyngsboro, MassachusettsCreek, Alaska:

  10. Bear Creek, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomass Conversions IncBay County, Florida:Tyngsboro, MassachusettsCreek,

  11. Fourche Creek Wastewater Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdf Jump to:ar-80m.pdfFillmoreGabbsSalonga, NewCorners InternationalFourche Creek

  12. Francis Creek, Wisconsin: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdf Jump to:ar-80m.pdfFillmoreGabbsSalonga,Francis Creek, Wisconsin: Energy

  13. Fritz Creek, Alaska: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdf Jump1946865°, -86.0529604° ShowCounty, California: Energyof theFrioCreek,

  14. Two Creeks, Wisconsin: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga, IndianaTurtle Airships Jump to:Twiggs County,EnergyEnergyOpenCreeks,

  15. Coal Creek, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, clickInformationNew York: Energy Resources JumpCloverCounty, Oklahoma:Creek,

  16. Deer Creek Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualPropertyd8c-a9ae-f8521cbb8489 No revision hasda62829c05b NoCounty, Nevada | OpenDeepiDeer Creek

  17. Results of the radiological survey at Two Mile Creek, Tonawanda, New York (TNY002)

    SciTech Connect (OSTI)

    Murray, M.E.; Rodriguez, R.E.; Uziel, M.S.

    1997-08-01T23:59:59.000Z

    At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at Two Mile Creek, Tonawanda, New York. The survey was performed in November 1991 and May 1996. The purpose of the survey was to determine if radioactive materials from work performed under government contract at the Linde Air Products Division of Union Carbide Corporation, Tonawanda, New York, had been transported into the creek. The survey included a surface gamma scan in accessible areas near the creek and the collection of soil, sediment, and core samples for radionuclide analyses. Survey results indicate that no significant material originating at the Linde plant is presently in the creek. Three of the 1991 soil sample locations on the creek bank and one near the lake contained slightly elevated concentrations of {sup 238}U with radionuclide distributions similar to that found in materials resulting from former processing activities at the Linde site.

  18. Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

    SciTech Connect (OSTI)

    Hoverson, Eric D.; Amonette, Alexandra

    2008-12-02T23:59:59.000Z

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek, Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success.

  19. Asotin Creek Model Watershed Plan: Asotin County, Washington, 1995.

    SciTech Connect (OSTI)

    Browne, Dave

    1995-04-01T23:59:59.000Z

    The Northwest Power Planning Council completed its ``Strategy for Salmon'' in 1992. This is a plan, composed of four specific elements,designed to double the present production of 2.5 million salmon in the Columbia River watershed. These elements have been called the ``four H's'': (1) improve harvest management; (2) improve hatcheries and their production practices; (3) improve survival at hydroelectric dams; and (4) improve and protect fish habitat. The Asotin Creek Model Watershed Plan is the first to be developed in Washington State which is specifically concerned with habitat protection and restoration for salmon and trout. The plan is consistent with the habitat element of the ``Strategy for Salmon''. Asotin Creek is similar in many ways to other salmon-bearing streams in the Snake River system. Its watershed has been significantly impacted by human activities and catastrophic natural events, such as floods and droughts. It supports only remnant salmon and trout populations compared to earlier years. It will require protection and restoration of its fish habitat and riparian corridor in order to increase its salmonid productivity.

  20. Vegetation survey of Pen Branch and Four Mile Creek wetlands

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    One hundred-fifty plots were recently sampled (vegetational sampling study) at the Savannah River Site (SRS). An extensive characterization of the vascular flora, in four predetermined strata (overstory, Understory, shrub layer, and ground cover), was undertaken to determine dominance, co-dominance, and the importance value (I.V.) of each species. These results will be used by the Savannah River Laboratory (SRL) to evaluate the environmental status of Four Mile Creek, Pen Branch, and two upland pine stands. Objectives of this study were to: Describe in detail the plant communities previously mapped with reference to the topography and drainage, including species of plants present: Examine the successional trends within each sampling area and describe the extent to which current vegetation communities have resulted from specific earlier vegetation disturbances (e.g., logging and grazing); describe in detail the botanical field techniques used to sample the flora; describe the habitat and location of protected and/or rare species of plants; and collect and prepare plant species as herbarium quality specimens. Sampling was conducted at Four Mile Creek and Pen Branch, and in two upland pine plantations of different age growth.

  1. Vegetation survey of Pen Branch and Four Mile Creek wetlands

    SciTech Connect (OSTI)

    Not Available

    1992-01-01T23:59:59.000Z

    One hundred-fifty plots were recently sampled (vegetational sampling study) at the Savannah River Site (SRS). An extensive characterization of the vascular flora, in four predetermined strata (overstory, Understory, shrub layer, and ground cover), was undertaken to determine dominance, co-dominance, and the importance value (I.V.) of each species. These results will be used by the Savannah River Laboratory (SRL) to evaluate the environmental status of Four Mile Creek, Pen Branch, and two upland pine stands. Objectives of this study were to: Describe in detail the plant communities previously mapped with reference to the topography and drainage, including species of plants present: Examine the successional trends within each sampling area and describe the extent to which current vegetation communities have resulted from specific earlier vegetation disturbances (e.g., logging and grazing); describe in detail the botanical field techniques used to sample the flora; describe the habitat and location of protected and/or rare species of plants; and collect and prepare plant species as herbarium quality specimens. Sampling was conducted at Four Mile Creek and Pen Branch, and in two upland pine plantations of different age growth.

  2. Groundwater contamination near the Hoe Creek UCG experiments

    SciTech Connect (OSTI)

    Wang, F.T.; Mead, S.W.; Stuermer, D.H.

    1981-01-01T23:59:59.000Z

    It has been shown that underground coal gasification (UCG) may introduce a broad range of residual gasification products into the groundwater of a coal aquifer. Sorption of many contaminants by the coal itself is an important factor in restricting the migration of these contaminants in the groundwater. However, our field studies, conducted at Lawrence Livermore National Laboratory's Hoe Creek site, have shown that sorption of organic compounds by coal is not as effective as expected, perhaps because the coal surface area is limited. Furthermore, if severe roof collapse has taken place during gasification, non-coal aquifers located above the gasified coal seam may be interconnected with the coal aquifer, and contaminants may enter these non-coal aquifers, in which sorption is even less effective. The Hoe Creek II and III experiments have provided us with opportunities to study the contamination of a sand aquifer located above a gasified coal seam in a hydrological recharge area. Our preliminary results indicate that the water in the overlying sand aquifer is much less contaminated with organic compounds than the water in the gasified coal aquifer. In conducting these field investigations, we have also learned valuable lessons concerning groundwater monitoring. A suggested monitoring strategy will be discussed.

  3. Chapter 3 -Basic Water Quality in the Boulder Creek Watershed, Colorado, During High-Flow and Low-Flow Conditions, 2000

    E-Print Network [OSTI]

    Chapter 3 - Basic Water Quality in the Boulder Creek Watershed, Colorado, During High-Flow and Low of the water quality of Boulder Creek, Colorado, during high-flow and low-flow conditions in the year 2000 constituents in Boulder Creek increased after the creek received wastewater effluent. INTRODUCTION Two programs

  4. Y-12 Construction hits one million-hour mark without a lost-time...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction hits one ... Y-12 Construction hits one million-hour mark without a lost-time accident Posted: August 30, 2012 - 5:30pm The B&W Y-12 Direct-Hire Construction team has...

  5. Analysis of Search Incidents and Lost Person Behavior in Yosemite National Park

    E-Print Network [OSTI]

    Doke, Jared

    2012-12-31T23:59:59.000Z

    Every year thousands of people are reported lost or missing in wilderness areas and in response, a search and rescue (SAR) operation is launched to locate, stabilize, and extract those missing. Actually locating the subject is often the most...

  6. Mixing energy analysis of Bingham plastic fluids for severe lost circulation prevention using similitude

    E-Print Network [OSTI]

    Massingill, Robert Derryl, Jr.

    2006-04-12T23:59:59.000Z

    As the demand for oil and gas resources increases, the need to venture into more hostile environments becomes a dynamic focus in the petroleum industry. One problem associated with certain high risk formations is lost circulation. As a result...

  7. Mixing energy analysis of Bingham plastic fluids for severe lost circulation prevention using similitude 

    E-Print Network [OSTI]

    Massingill, Robert Derryl, Jr.

    2006-04-12T23:59:59.000Z

    As the demand for oil and gas resources increases, the need to venture into more hostile environments becomes a dynamic focus in the petroleum industry. One problem associated with certain high risk formations is lost ...

  8. Evaluation of equipment and methods to map lost circulation zones in geothermal wells

    SciTech Connect (OSTI)

    McDonald, W.J.; Leon, P.A.; Pittard, G.

    1981-05-01T23:59:59.000Z

    A study and evaluation of methods to locate, characterize, and quantify lost circulation zones are described. Twenty-five methods of mapping and quantifying lost circulation zones were evaluated, including electrical, acoustical, mechanical, radioactive, and optical systems. Each tool studied is described. The structured, numerical evaluation plan, used as the basis for comparing the 25 tools, and the resulting ranking among the tools is presented.

  9. Results from the third LLL underground coal gasification experiment at Hoe Creek

    SciTech Connect (OSTI)

    Hill, R.W.; Thorsness, C.B.; Cena, R.J.; Aiman, W.R.; Stephens, D.R.

    1980-05-20T23:59:59.000Z

    A major objective of the US Energy Program is the development of processes to produce clean fuels from coal. Underground coal gasification is one of the most promising of these processes. If successful, underground coal gasification (UCG) would quadruple the proven reserves of the US coal. Cost for products produced from UCG are projected to be 65 to 75% of those from conventional coal conversion. Finally, UCG appears to possess environmental advantages since no mining is involved and there are less solid wastes produced. In this paper we describe results from the Hoe Creek No. 3 underground coal gasification test. The experiment employed a drilled channel between process wells spaced 130' apart. The drilled channel was enlarged by reverse combustion prior to forward gasification. The first week of forward gasification was carried out using air injection, during which 250 tons of coal were consumed yielding an average dry product gas heating value of 114 Btu/scf. Following this phase, steam and oxygen were injected (generally a 50-50 mixture) for 47 days, during which 3945 tons of coal were consumed at an average rate of 84 tons of coal per day and an average dry gas heating value of 217 Btu/scf. The average gas composition during the steam-oxygen phase was 37% H/sub 2/, 5% CH/sub 4/, 11% CO, and 44% CO/sub 2/. Gas recovery was approximately 82% during the test, and the average thermochemical efficiency was near 65%.

  10. 2008 Wind Energy Projects, Wind Powering America (Poster)

    SciTech Connect (OSTI)

    Not Available

    2009-01-01T23:59:59.000Z

    The Wind Powering America program produces a poster at the end of every calendar year that depicts new U.S. wind energy projects. The 2008 poster includes the following projects: Stetson Wind Farm in Maine; Dutch Hill Wind Farm in New York; Grand Ridge Wind Energy Center in Illinois; Hooper Bay, Alaska; Forestburg, South Dakota; Elbow Creek Wind Project in Texas; Glacier Wind Farm in Montana; Wray, Colorado; Smoky Hills Wind Farm in Kansas; Forbes Park Wind Project in Massachusetts; Spanish Fork, Utah; Goodland Wind Farm in Indiana; and the Tatanka Wind Energy Project on the border of North Dakota and South Dakota.

  11. Influence of Habitat Modifications on Habitat Composition and Anadromous Salmonid Populations in Fish Creek, Oregon, 1983-1988 Annual Report.

    SciTech Connect (OSTI)

    Reeves, Gordon H.; Everest, Fred H. (Oregon State University, Pacific Northwest Forest and Range Experiment Station, Corvallis, OR); Hohler, David B. (Mount Hood National Forest, Clackamas River Ranger District, Estacada, OR)

    1990-05-01T23:59:59.000Z

    Modification of degraded habitats to increase populations of anadromous salmonids is a major focus of management agencies throughout the Pacific Northwest. Millions of dollars are spent annually on such efforts. Inherent in implementing habitat improvements is the need for quantitative evaluation of the biological and physical effects of such work. Reeves et al. (in press), however, noted that such evaluations are rare, making it difficult to assess the true results of habitat work. While it is not economically possible to thoroughly evaluate every habitat project, it is essential that intensive evaluations be done on selected representative projects. One such evaluation program has been underway since 1982 on Fish Creek, a tributary of the Clackamas River near Estacada, OR. Habitat modification has been done by the USDA Forest Service, Estacada Ranger District, Mt. Hood National Forest with funding provided in part by the Bonneville Power Administration (BPA). The USDA Forest Service, Anadromous Fish Habitat Research Unit, Pacific Northwest Research Station (PNW), Corvallis, OR is charged with: (1) evaluating the biological and physical responses to habitat modifications on a basin scale; and (2) developing a cost-benefit analysis of the program. Preliminary results have been reported in a series of annual publications, Everest and Sedell 1983, 1984 and Everest et al. 1985, 1986, 1987, 1988. The objectives of this paper are to: (1) report 1988 observations of biological and physical changes in habitat, salmonid populations, and smolt production in Fish Creek, and (2) examine preliminary trends in fish habitat and populations related to habitat improvement over the period 1983-1988. We have prefaced the trends in the latter objective as preliminary because we believe it could take a minimum of 10 years before the full biological and physical responses to habitat work are realized. We therefore urge caution in interpreting these preliminary results.

  12. Restoration With Reference: Rediscovering Cerrito Creek in Blake Garden

    E-Print Network [OSTI]

    Ludy, Jessica; Podolak, Kristen

    2007-01-01T23:59:59.000Z

    of a Small Urban Stream Restoration Project in Northernin combining in-stream restoration with water collection toProject LA 227 – Restoration of River and Streams University

  13. Review of underground coal gasification field experiments at Hoe Creek

    SciTech Connect (OSTI)

    Thorsness, C.B.; Creighton, J.R.

    1983-01-01T23:59:59.000Z

    LLNL has conducted three underground coal gasification experiments at the Hoe Creek site near Gillette, WY. Three different linking methods were used: explosive fracturing, reverse burning and directional drilling. Air was injected on all three experiments and a steam/oxygen mixture during 2 days of the second and most of the third experiment. Comparison of results show that the linking method didn't influence gas quality. The heat of combustion of the product gas was higher with steam/oxygen injection, mainly because of reduced inert diluent. Gas quality was generally independent of other operating parameters, but declined from its initial value over a period of time. This was due to heat loss to the wet overburden and extensive roof collapse in the second and third experiments.

  14. Review of underground coal gasification field experiments at Hoe Creek

    SciTech Connect (OSTI)

    Thorsness, C.B.; Creighton, J.R.

    1983-01-01T23:59:59.000Z

    In three underground coal gasification experiments at the Hoe Creek site near Gillette, WY, LLNL applied three different linking methods: explosive fracture, reverse burning, and directional drilling. Air was injected in all three experiments; a steam/oxygen mixture, during 2 days of the second and most of the third experiment. Comparison of results show that the type of linking method did not influence gas quality. The heat of combustion of the product gas was higher with steam/oxygen injection, mainly because of reduced inert diluent. Gas quality was generally independent of other operating parameters but declined from its initial value over a period of time because of heat loss to the wet overburden and extensive roof collapse in the second and third experiments.

  15. The Elk Creek Carbonatite, Southeast Nebraska-An Overview

    SciTech Connect (OSTI)

    Carlson, M. P., E-mail: mcarlson1@unl.edu; Treves, S. B. [University of Nebraska, Nebraska Geological Survey (United States)

    2005-03-15T23:59:59.000Z

    A framework geophysical program in southeastern Nebraska during 1970 identified a near-circular feature having gravity relief of about 8 mgal and a magnetic anomaly of about 800 gammas. Analysis of the geophysical data provided a model of a cylindrical mass of indefinite length with a radius of 5500 ft (1676 m) and beveled at the basement surface at about 600 ft (183 m). At the approximate depth at which Precambrian rocks were expected, the initial test hole (2-B-71) encountered an iron-rich weathered zone overlying carbonate-rich rock. The carbonate rocks consist essentially of dolomite, calcite, and ankerite and lesser amounts of hematite, chlorite, phlogopite, barite, serpentine, pyrochlore, and quartz and contain barium, strontium, and rare earths. Total REE, P2O5, and 87Sr/86Sr ratios confirm the carbonatite identification. Texturally, the rocks range from fragmental to contorted to massive. Associated with the carbonatite are lesser amounts of basalt, lamprophyre, and syenite. Additional exploratory drilling has provided about 80,000 ft (24,384 m) of rock record and has penetrated about 3400 ft (1038 m) of carbonatite. The carbonatite is overlain by marine sediments of Pennsylvanian (Missourian) age. The surrounding Precambrian basement rocks are low-to medium-grade metamorphic gneiss and schist of island arc origin and granitic plutons. The Elk Creek carbonatite is located near the boundary between the Penokean orogen created at about 1.84 Ga (billion years) and the Dawes terrane (1.78 Ga) of the Central Plains orogen. This boundary strongly influenced the geometry of both the Midcontinent Rift System (1.1 Ga) and the Nemaha uplift (0.3 Ga). It is assumed that the emplacement of the Elk Creek carbonatite (0.5 Ga) was influenced similarly by the pre-existing tectonic sutures.

  16. Walla Walla River Basin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    SciTech Connect (OSTI)

    Volkman, Jed (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2005-12-01T23:59:59.000Z

    In 2002 and 2003, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts on private properties in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of this effort is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled nine properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and four properties on the mainstem Walla Walla River. Major accomplishments during the reporting period include the following: (1) Secured approximately $229,000 in project cost share; (2) Purchase of 46 acres on the mainstem Walla Walla River to be protected perpetually for native fish and wildlife; (3) Developed three new 15 year conservation easements with private landowners; (4) Installed 3000 feet of weed barrier tarp with new plantings within project area on the mainstem Walla Walla River; (5) Expanded easement area on Couse Creek to include an additional 0.5 miles of stream corridor and 32 acres of upland habitat; (6) Restored 12 acres on the mainstem Walla Walla River and 32 acres on Couse Creek to native perennial grasses; and (7) Installed 50,000+ new native plants/cuttings within project areas.

  17. Final Technical Report Quantification and Standardization of Pattern Properties for the Control of the Lost Foam Casting Process

    SciTech Connect (OSTI)

    Ronald Michaels

    2005-09-30T23:59:59.000Z

    This project takes a fresh look at the ''white side'' of the lost foam casting process. We have developed the gel front hypothesis for foam pyrolysis behavior and the magnetic metal pump method for controlling lost foam casting metal fill event. The subject of this report is work done in the improvement of the Lost Foam Casting Process. The original objective of this project was to improve the control of metal fill by understanding the influence of foam pattern and coating properties on the metal fill event. Relevant pattern properties could then be controlled, providing control of the metal fill event. One of the original premises of this project was that the process of metal fill was relatively well understood. Considerable previous work had been done to develop fluid mechanical and heat transfer models of the process. If we could just incorporate measured pattern properties into these models we would be able predict accurately the metal fill event. As we began to study the pyrolysis behavior of EPS during the metal fill event, we discovered that the chemical nature of this event had been completely overlooked in previous research. Styrene is the most prevalent breakdown product of EPS pyrolysis and it is a solvent for polystyrene. Much of the styrene generated by foam pyrolysis diffuses into intact foam, producing a molten gel of mechanically entangled polystyrene molecules. Much of the work of our project has centered on validation of this concept and producing a qualitative model of the behavior of EPS foam undergoing pyrolysis in a confined environment. A conclusion of this report is that styrene dissolution in EPS is a key phenomenon in the pyrolysis process and deserves considerable further study. While it is possible to continue to model the metal fill event parametrically using empirical data, we recommend that work be undertaken by qualified researchers to directly characterize and quantify this phenomenon for the benefit of modelers, researchers, and workers in the field. Another original premise of this project was that foam pattern and coating properties could be used to efficiently control metal fill. After studying the structure of EPS foam in detail for the period of this contract, we have come to the conclusion that EPS foam has an inherent variability at a scale that influences metal fill behavior. This does not allow for the detailed fine control of the process that we originally envisioned. We therefore have sought other methods for the control of the metal fill event. Of those, we now believe that the magnetic metal pump shows the most promise. We have conducted two casting trials using this method and preliminary results are very encouraging. A conclusion of our report is that, while every effort should continue to be made to produce uniform foam and coatings, the use of the magnetic metal pump should be encouraged and closed loop control mechanisms should be developed for this pouring method.

  18. Tribal Decision-Making and Intercultural Relations: Crow Creek Agency, 1863-1885

    E-Print Network [OSTI]

    Galler, Robert

    2002-03-01T23:59:59.000Z

    Lower Yanktonai residents experienced great change during the first two decades at the Crow Creek agency in Dakota Territory. This essay traces the evolution of relations between tribal members, federal agents, and ...

  19. The investigation of the Caney Creek shipwreck archaeological site 41MG32 

    E-Print Network [OSTI]

    Hedrick, David Layne

    1998-01-01T23:59:59.000Z

    documentation exists concerning Caney Creek or its associated trade. Archaeological investigations, however, have revealed several aspects this steamer had in common with other western river steamboats. This thesis will help illustrate western river steamboat...

  20. HYDROGEOLOGIC CONSEQUENCES OF THE MODIFIED IN-SITU RETORTING PROCESS, PICEANCE CREEK BASIN, COLORADO

    E-Print Network [OSTI]

    Mehran, M.

    2014-01-01T23:59:59.000Z

    Water Management in Oil Shale Mining," Volumes I and II,and Technology of Oil Shale," Ann Arbor Science PublishersRequirements at an Oil Shale Surface Mine, Piceance Creek

  1. Review of underground coal-gasification field experiments at Hoe Creek. [Hoe Creek 1, 2, and 3

    SciTech Connect (OSTI)

    Thorsness, C.B.; Creighton, J.R.

    1982-05-26T23:59:59.000Z

    LLNL has conducted three underground coal gasification experiments at the Hoe Creek site near Gillette, Wyoming. Three different linking methods were used: explosive fracture, reverse burning and directional drilling. Air was injected on all three experiments and a steam/oxygen mixture during 2 days of the second and most of the third experiment. Comparison of results show that the linking method didn't influence gas quality. The heat of combustion of the product gas was higher with steam/oxygen injection, mainly because of reduced inert diluent. Gas quality was generally independent of other operating parameters, but declined from its initial value over a period of time. This was due to heat loss to the wet overburden and extensive roof collapse in the second and third experiments.

  2. Geology of the Middle Beaver Creek area, Mason and Gillespie Counties, Texas

    E-Print Network [OSTI]

    Peterson, Don Hamilton

    1959-01-01T23:59:59.000Z

    AREA, NASGR AEG GILhNPIR COGRTIES, TEIAB ABSTRACT The Middle Beaver Creek area is situated on the soutlwsst flank of the Llano ?plift region in Mason and Gillespie Counties, Texas Hooks of Presa?brian, Psleosoie, Mesosois, and Genosois age... ' Figure 1. ? Map of' part of Mason and Gillespie Counties, Texass showing location of' the Middle Beaver Creek Area, on aoetats oosered aerial photographs. In order to aoourateIp locate and plot the oontaots asd faults, the photographs vere studies...

  3. Correlation of stratigraphy with revegetation conditions at the Gibbons Creek Lignite Mine, Grimes County, Texas

    E-Print Network [OSTI]

    Parisot, Laurence D.

    1991-01-01T23:59:59.000Z

    CORRELATION OF STRATIGRAPHY WITH REVEGETATION CONDITIONS AT THE GIBBONS CREEK LIGNITE MINE, GRIMES COUNTY, TEXAS A Thesis by LAURENCE D. PARISOT Submitted to the Office of Graduate Studies of Texas ARM University in partial fulfillment... of the requirements for the degree of MASTER OF SCIENCE December 1991 Major Subject: Geology CORRELATION OF STRATIGRAPHY WITH REVEGETATION CONDITIONS AT THE GIBBONS CREEK LIGNITE MINE, GRIMES COUNTY, TEXAS A Thesis by LAURENCE D. PARISOT ; Approved...

  4. Lost Opportunities in the Buildings Sector: Energy-Efficiency Analysis and Results

    SciTech Connect (OSTI)

    Dirks, James A.; Anderson, David M.; Hostick, Donna J.; Belzer, David B.; Cort, Katherine A.

    2008-09-12T23:59:59.000Z

    This report summarizes the results and the assumptions used in an analysis of the potential “lost efficiency opportunities” in the buildings sector. These targets of opportunity are those end-uses, applications, practices, and portions of the buildings market which are not currently being addressed, or addressed fully, by the Building Technologies Program (BTP) due to lack of resources. The lost opportunities, while a significant increase in effort and impact in the buildings sector, still represent only a small portion of the full technical potential for energy efficiency in buildings.

  5. Kalispel Resident Fish Project : Annual Report, 2008.

    SciTech Connect (OSTI)

    Andersen, Todd [Kalispel Natural Resource Department

    2009-07-08T23:59:59.000Z

    In 2008, the Kalispel Natural Resource Department (KNRD) continued to implement its habitat enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Baseline fish population and habitat assessments were conducted in Upper West Branch Priest River. Additional fish and habitat data were collected for the Granite Creek Watershed Assessment, a cooperative project between KNRD and the U.S. Forest Service Panhandle National Forest (FS) . The watershed assessment, funded primarily by the Salmon Recovery Funding Board of the State of Washington, will be completed in 2009.

  6. Fish Bulletin No. 98. The Life Histories of the Steelhead Rainbow Trout (Salmo gairdneri gairdneri) and Silver Salmon (Oncorhynchus kisutch) with Special Reference to Waddell Creek, California, and Recommendations Regarding Their Management

    E-Print Network [OSTI]

    Shapovalov, Leo; Taft, Alan C

    1954-01-01T23:59:59.000Z

    on fish foods in Waddell Creek Lagoon. Amer. Fish. Soc. ,p. 248–251. 1936. The Waddell Creek Experimental Station forsilver salmon from Waddell Creek caught near Fort Bragg.

  7. Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-11-01T23:59:59.000Z

    The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

  8. A Conceptual Restoration Plan and Tidal Hydrology Assessment for Reconnecting Spring Branch Creek to Suisun Marsh, Solano County, California

    E-Print Network [OSTI]

    Olson, Jessica J.

    2012-01-01T23:59:59.000Z

    EDAW 2007. Potrero Hills Landfill FEIR Volume 1. Solanothe headwaters at Potrero Hills Landfill is the headwatersBranch Creek, Potrero Hills Landfill and a private rancher

  9. C(re)ek-storation Community Collaboration Site: North Fork of Strawberry Creek by La Loma and Le Conte Avenues

    E-Print Network [OSTI]

    Tannenbaum, Sara Rose

    2011-01-01T23:59:59.000Z

    history of urban stream restoration. Aquatic Conservation:on Codornices Creek”. Restoration of Rivers and Streams.Restoration of Rivers and Streams, Water Resources

  10. Developing Standard Logic for a Detailed Engineering Project Schedule in the Process Industry

    E-Print Network [OSTI]

    Miller-Karns, Kara A.

    2009-05-15T23:59:59.000Z

    A good schedule is critical to the successful execution of any project. This is especially true in the process industry, where construction schedule overruns can be costly to the client due to lost production capability. ...

  11. Fractal branching organizations of Ediacaran rangeomorph fronds reveal a lost Proterozoic body plan

    E-Print Network [OSTI]

    Cambridge, University of

    Fractal branching organizations of Ediacaran rangeomorph fronds reveal a lost Proterozoic body plan, using parametric Lindenmayer systems, a first formal model of rangeomorph morphologies reveals a fractal-filling strategies. The fractal body plan of rangeomorphs is shown to maximize surface area, consistent

  12. Carbon geochemistry of serpentinites in the Lost City Hydrothermal System (30N, MAR)

    E-Print Network [OSTI]

    Gilli, Adrian

    Massif (Mid-Atlantic Ridge, 30°N) was exam- ined to characterize carbon sources and speciation in oceanic. The speciation of carbon de- pends on the chemical and physical conditions prevailing in the reservoir, and itsCarbon geochemistry of serpentinites in the Lost City Hydrothermal System (30°N, MAR) Ade

  13. In Proceedings of Supercomputing '94, pp. 600-610. Parallel Performance Prediction Using Lost Cycles Analysis

    E-Print Network [OSTI]

    Crovella, Mark

    performance debugging and tuning of paral- lel programs is based on the \\measure-modify" ap- proach, which modeling and scalability anal- ysis provide predictive power, but are not widely used in practice, due programs that bridges this gap between measurement and modeling. Our approach is based on lost cycles

  14. Theodor Meyer--Lost pioneer of gas dynamics Gary S. Settles a,, Egon Krause b

    E-Print Network [OSTI]

    Settles, Gary S.

    Theodor Meyer--Lost pioneer of gas dynamics Gary S. Settles a,Ă, Egon Krause b , Heinz F ¨utterer c August 2009 a b s t r a c t Theodor Meyer's 1908 doctoral dissertation, with Ludwig Prandtl (1875­1953) as his advisor, introduced much of what has now become basic gas dynamics: not only the Prandtl­Meyer

  15. Postburn core-drilling results from Hoe Creek 3

    SciTech Connect (OSTI)

    Ramirez, A.L.; Ganow, H.C.; Wilder, D.G.

    1981-10-08T23:59:59.000Z

    This paper presents interpretations derived from the analysis of the postburn drilling results from the Hoe Creek 3 experiment. Sixteen partially cored boreholes were drilled using an HQ triple-tube core barrel. The general objectives of this work were to establish the characteristics of the burn cavity and of the materials within and surrounding the cavity. The lateral extent of the burn and the characteristics of the collapsed region overlying the burn cavity were also to be investigated. Important conclusions derived from this study include the following: (1) The horizontally drilled link borehole strongly controlled burn cavity shape and location; no significant combustion occurred below the link; (2) the slag may have acted as an insulation blanket, protecting the coal below the horizontal link borehole; (3) significant roof collapse occurred during the course of the experiment, probably inducing substantial heat losses; (4) the lateral extent of the burn was greatest along the Felix 2 seam; the cavity outline in plan view is shaped like a teardrop; a vertical transverse cross section through the cavity shows a mushroom-shaped outline; (5) roof collapse after the end of the experiment filled much of the space within and above the cavity, producing a mechanically disturbed zone full of voids and weak materials. A zone of fractures or loosened material exists in the remaining (uncollapsed) roof and wall materials, surrounding and paralleling the upper margins of the collapsed region. A void zone was found near the bottom of the collapsed region.

  16. Something Lost

    E-Print Network [OSTI]

    Clark, Sheila

    1983-01-01T23:59:59.000Z

    the int(~ll? :i.gence to :cuDJ.iso that little problem. About the tails - He'll just h?;v(~ to hope that tnoy l; . r:i.ll c'Lccep-trank insigni.:1 in lieu of tails carried. high. It thcy':ce already in contr'..ct wit}} the IJ1ederation they must know...:'C"lnov(:cJ. from the l".mlx~,f;;Fj2.clo:cial party 0 And tha.t would nover do. T:'G Jx:.cl his own pJ.;::tDS for tho future -- and they (:id not (::ntircly coincL:lo I,vi th f)':::,T:'C':.1.1' n ??? ""Jelcome 2:,bor:?1Td th(~ Jl~ntGTpJ:'ise 9 Ambassador. 1f...

  17. Kalispel Non-Native Fish Suppression Project 2007 Annual Report.

    SciTech Connect (OSTI)

    Wingert, Michele; Andersen, Todd [Kalispel Natural Resource Department

    2008-11-18T23:59:59.000Z

    Non-native salmonids are impacting native salmonid populations throughout the Pend Oreille Subbasin. Competition, hybridization, and predation by non-native fish have been identified as primary factors in the decline of some native bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi) populations. In 2007, the Kalispel Natural Resource Department (KNRD) initiated the Kalispel Nonnative Fish Suppression Project. The goal of this project is to implement actions to suppress or eradicate non-native fish in areas where native populations are declining or have been extirpated. These projects have previously been identified as critical to recovering native bull trout and westslope cutthroat trout (WCT). Lower Graham Creek was invaded by non-native rainbow (Oncorhynchus mykiss) and brook trout (Salvelinus fontinalis) after a small dam failed in 1991. By 2003, no genetically pure WCT remained in the lower 700 m of Graham Creek. Further invasion upstream is currently precluded by a relatively short section of steep, cascade-pool stepped channel section that will likely be breached in the near future. In 2008, a fish management structure (barrier) was constructed at the mouth of Graham Creek to preclude further invasion of non-native fish into Graham Creek. The construction of the barrier was preceded by intensive electrofishing in the lower 700 m to remove and relocate all captured fish. Westslope cutthroat trout have recently been extirpated in Cee Cee Ah Creek due to displacement by brook trout. We propose treating Cee Cee Ah Creek with a piscicide to eradicate brook trout. Once eradication is complete, cutthroat trout will be translocated from nearby watersheds. In 2004, the Washington Department of Fish and Wildlife (WDFW) proposed an antimycin treatment within the subbasin; the project encountered significant public opposition and was eventually abandoned. However, over the course of planning this 2004 project, little public involvement or education was conducted prior to the planned implementation. Therefore, in 2007 we implemented an extensive process to provide public education, address public concerns and provide opportunity for public involvement in implementing piscicides and other native fish recovery actions in the subbasin.

  18. Showcasing a Project

    E-Print Network [OSTI]

    Miller, Kari

    2007-01-01T23:59:59.000Z

    , an environmental microbiologist at The Texas A&M University System Agricultural Research and Extension Center at El Paso, to conduct bacterial source tracking (BST). He will use DNA analyses to identify the sources of the creek?s bacteria deter- mining whether...tx H2O | pg. 7 With one phase and three years ofmonitoring completed, a group ofcooperators are beginning the next step in bringing Buck Creek, a small stream in the Red River Basin, to acceptable water quality. The creek, which runs through...

  19. Dissolved Oxygen in Allen CreekDissolved Oxygen in Allen Creek Dissolved oxygen (DO) enters the water by diffusion from air, as a by-product of photosynthesis and

    E-Print Network [OSTI]

    Tyler, Christy

    Dissolved Oxygen in Allen CreekDissolved Oxygen in Allen Creek Dissolved oxygen (DO) enters and rapids. There is an inverse relationship between temperature and DO, i.e. colder water holds more oxygen it supplies oxygen to aquatic organisms. Higher DO levels also give the water a better taste. Figure 2. During

  20. Monitoring channel change at the Sausal Creek Restoration Project, Oakland, California

    E-Print Network [OSTI]

    Grantham, Ted; Tollefson, Kate

    2006-01-01T23:59:59.000Z

    s LA 227 Restoration of Rivers and Streams Class (Professors LA 227 Restoration of Rivers and Streams Class (Professors LA 227 Restoration of Rivers and Streams Class- Fall

  1. An Archaeological Survey for the Turkey Creek Trail Project in Brazos County, Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-07-15T23:59:59.000Z

    Recreation Trails grant administered by the Texas Parks and Wildlife Service. To be eligible, the applicant competed with numerous public entities and non-profit corporations. Grantees were selected on need and services provided. The area examined consisted...

  2. Project Chariot - Final Report, Archaeological Survey and Excavations at Ogotoruk Creek, Northwestern Alaska, December 1961

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTuba City, Arizona, DisposalFourthN V O 1 8 7 +NewAugust Only critical

  3. Microsoft Word - CSKT_Lake_County_AcquisitionsCreek-CX.doc

    Broader source: Energy.gov (indexed) [DOE]

    Confederated Salish and Kootenai Tribes (CSKT) for purchase of Lake County properties. Fish and Wildlife Project No.: 2002-003-00, Contract 49933 Categorical Exclusion Applied...

  4. Microsoft Word - CX-Wautoma-Rock Creek_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    3, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the...

  5. Boiling Water at Hot Creek--The Dangerous and Dynamic Thermal Springs in California's Long Valley Caldera

    E-Print Network [OSTI]

    Torgersen, Christian

    ). Conditions in Hot Creek can change very quickly. These fish--caught in a burst of high-temperature water" or intermittently spurting very hot, sediment-laden water as high as 6 feet (2 m) above the stream surface. At timesBoiling Water at Hot Creek--The Dangerous and Dynamic Thermal Springs in California's Long Valley

  6. Simulation of contaminated sediment transport in White Oak Creek basin

    SciTech Connect (OSTI)

    Bao, Y.; Clapp, R.B.; Brenkert, A.L. [Oak Ridge National Lab., TN (United States); Moore, T.D. [Department of Civil and Environmental Engineering, University of Tennessee, Knoxville, TN (United States); Fontaine, T.A. [Department of Civil and Environmental Engineering, South Dakota School of Mines and Technology, Rapid City, SD (United States)

    1995-12-31T23:59:59.000Z

    This paper presents a systematic approach to management of the contaminated sediments in the White Oak Creek watershed at Oak Ridge National Laboratory near Oak Ridge, Tennessee. The primary contaminant of concern is radioactive cesium-137 ({sup 137}Cs), which binds to soil and sediment particles. The key components in the approach include an intensive sampling and monitoring system for flood events; modeling of hydrological processes, sediment transport, and contaminant flux movement; and a decision framework with a detailed human health risk analysis. Emphasis is placed on modeling of watershed rainfall-runoff and contaminated sediment transport during flooding periods using the Hydrologic Simulation Program- Fortran (HSPF) model. Because a large number of parameters are required in HSPF modeling, the major effort in the modeling process is the calibration of model parameters to make simulation results and measured values agree as closely as possible. An optimization model incorporating the concepts of an expert system was developed to improve calibration results and efficiency. Over a five-year simulation period, the simulated flows match the observed values well. Simulated total amount of sediment loads at various locations during storms match with the observed values within a factor of 1.5. Simulated annual releases of {sup 137}Cs off-site locations match the data within a factor of 2 for the five-year period. The comprehensive modeling approach can provide a valuable tool for decision makers to quantitatively analyze sediment erosion, deposition, and transport; exposure risk related to radionuclides in contaminated sediment; and various management strategies.

  7. Salt Creek Canyon, Canyonlands, Utah, May 2010 One week after the fact, at the tail-end of the weekend, I'm sitting down to write

    E-Print Network [OSTI]

    Bardsley, John

    Salt Creek Canyon, Canyonlands, Utah, May 2010 One week after the fact, at the tail the week following UM's graduation, and reserving backcountry camp sites in Canyonlands' Salt Creek Canyon. The itinerary would take us from the south end of Salt Creek Canyon to the Needles' District visitor center

  8. Diagenesis of sandstones from the Douglas Creek member of the Green River Formation (Eocene) at Red Wash field, Uintay County, Utah

    E-Print Network [OSTI]

    Ray, Earl Scott

    1985-01-01T23:59:59.000Z

    , sandstone and some limestone and dolomite beds. The Garden Creek Member at Red Wash Field is about 550 ft (168 m) thick. The Parachute Creek Member, overlying the Garden Creek, is largely oil shale, gray shale, and limestone and dolomite beds...

  9. Biological monitoring of Upper Three Runs Creek, Savannah River Plant, Aiken County, South Carolina

    SciTech Connect (OSTI)

    Specht, W.L.

    1991-10-01T23:59:59.000Z

    In anticipation of the fall 1988 start up of effluent discharges into Upper Three Creek by the F/H Area Effluent Treatment Facility of the Savannah River Site, Aiken, SC, a two and one half year biological study was initiated in June 1987. Upper Three Runs Creek is an intensively studied fourth order stream known for its high species richness. Designed to assess the potential impact of F H area effluent on the creek, the study includes qualitative and quantitative macroinvertebrate stream surveys at five sites, chronic toxicity testing of the effluent, water chemistry and bioaccumulation analysis. This final report presents the results of both pre-operational and post-operational qualitative and quantitative (artificial substrate) macroinvertebrate studies. Six quantitative and three qualitative studies were conducted prior to the initial release of the F/H ETF effluent and five quantitative and two qualitative studies were conducted post-operationally.

  10. Biomonitoring of fish communities, using the index of Biotic Integrity, as an indicator of the success of soil conservation measures in the Rabbit Creek and Middle Creek watersheds, Macon County, North Carolina

    SciTech Connect (OSTI)

    Not Available

    1993-08-01T23:59:59.000Z

    Fish communities in two upper Little Tennessee River tributaries, Rabbit Creek and Middle Creek, both located in Macon County, North Carolina, were monitored using IBI methods in 1990 and again in 1992. A single site, each on the lower reaches of its respective creek, was chosen to reflect the influence of conditions throughout the watershed and to provide a measure of water quality exiting the watershed. The Rabbit Creek watershed (Holly Springs community) has a long history of settlement and agricultural use. Dominant land uses today are pasture in the bottom lands and residential development at higher elevations. Much of the upper portion of the Middle Creek watershed on the slopes of Scaly Mountain is devoted to cabbage farming, often on steep slopes and highly erodible soils. From the cabbage growing area, the creek drops 400 feet to the lower valley. Other common land uses include residential, livestock, and forest. Both streams are characterized by heavy sedimentation and frequent high turbidity. Both streams showed marked improvement between 1990 and 1992. In 1990, Rabbit Creek`s IBI score was 31.0, for a bioclass rating of ``poor.`` In 1992, the IBI score was 42.1 for a bioclass rating of ``fair.`` For Middle Creek, the corresponding figures and ratings are 42.1 (fair) and 54.5 (good). Examination of the data for Rabbit Creek shows a reduction in the proportion of pollution-tolerant species, a higher proportion of specialized insectivores, a higher catch rate (reflecting higher total numbers of fish), and an additional intolerant species. In both cases, the data (supported by visual observation) suggests the causative factor is reduced sedimentation.

  11. Uranium in the Oatman Creek granite of Central Texas and its economic potential

    E-Print Network [OSTI]

    Conrad, Curtis Paul

    1982-01-01T23:59:59.000Z

    OF SCIENCE December 1982 Major Subject: GEOLOGY URANIUM IN THE OATMAN CREEK GRANITE OF CENTRAL TEXAS AND ITS ECONOMIC POTENTIAL A Thesis by CURTIS PAUL CONRAD Approved as to sty1e and content by; C airman of Committee Member em er ep men December... 1982 ABSTRACT Uranium in the Datman Creek Granite of Central Texas and its Economic Potential . (December 1 982) Curtis Paul Conrad, B. S. , Texas ABN University Chairman of Adv1sory Comm1ttee: Dr. Thomas T. Tieh Recent studies indicate that many...

  12. Steam tracer experiment at the Hoe Creek No. 3 underground coal gasification field test

    SciTech Connect (OSTI)

    Thorsness, C.B.

    1980-11-26T23:59:59.000Z

    Water plays an important role in in-situ coal gasification. To better understand this role, we conducted a steam tracer test during the later stages of the Hoe Creek No. 3 underground coal gasification field test. Deuterium oxide was used as the tracer. This report describes the tracer test and the analysis of the data obtained. The analysis indicates that at Hoe Creek the injected steam interacts with a large volume of water as it passes through the underground system. We hypothesize that this water is undergoing continual reflux in the underground system, resulting in a tracer response typical of a well-stirred tank.

  13. Laboratory and field evaluation of polyurethane foam for lost circulation control

    SciTech Connect (OSTI)

    Glowka, D.A.; Loeppke, G.E.; Rand, P.B.; Wright, E.K. (Sandia National Labs., Albuquerque, NM (USA))

    1989-01-01T23:59:59.000Z

    A two-part polyurethane foam has been tested in the laboratory and in the field to assess its utility in controlling lost circulation encountered when drilling geothermal wells. A field test was conducted in The Geysers in January, 1988, to evaluate the chemical formulation and downhole tool used to deploy the chemicals. Although the tool apparently functioned properly in the field test, the chemicals failed to expand sufficiently downhole, instead forming a dense polymer that may be ineffective in sealing loss zones. Subsequent laboratory tests conducted under simulated downhole conditions indicate that the foam chemical undergo sever mixing with water in the wellbore, which disturbs the kinetics of the chemical reaction more than was previously contemplated. The results indicate that without significant changes in the foam chemical formulation or delivery technique, the foam system will be ineffective in lost circulation control except under very favorable conditions. 4 refs., 6 figs., 2 tabs.

  14. Lost Opportunities in Industrial Energy Efficiency: New Production Lean Manufacturing and Lean Energy

    E-Print Network [OSTI]

    Seryak, J.; Epstein, G.; D'Antonio, M.

    2006-01-01T23:59:59.000Z

    companies regularly increase production by adding additional manufacturing equipment, or increasing operating hours. This approach can add large new energy loads to the electrical grid and gas distribution networks. Alternately, increasing production...Lost Opportunities in Industrial Energy Efficiency: New Production, Lean Manufacturing and Lean Energy John Seryak Gary Epstein Mark D’Antonio Engineer jseryak@ers-inc.com President gepstein@ers-inc.com Vice President mdantonio...

  15. Long road to recovery: Bastrop team develops plan to restore Lost Pines region

    E-Print Network [OSTI]

    Bentz, Laura

    2012-01-01T23:59:59.000Z

    from the September #28;re. ?In terms of the recovery, the Lost Pines Recovery Team put together a #28;ve-year plan that includes erosion control, reseeding, replanting and hazardous fuels management,? said Roxanne Hernandez, habitat conservation... challenges Erosion has proven to be one of the most di#27;cult challenges to recovery. Initially, the #28;re caused much fertile soil to erode. Hernandez said until vegetation grows to provide ground cover, erosion will continue. Newly planted pine tree...

  16. Sources of Mercury to East Fork Poplar Creek Downstream from the Y-12 National Security Complex: Inventories and Export Rates

    SciTech Connect (OSTI)

    Southworth, George R [ORNL; Greeley Jr, Mark Stephen [ORNL; Peterson, Mark J [ORNL; Lowe, Kenneth Alan [ORNL; Ketelle, Richard H [ORNL; Floyd, Stephanie B [ORNL

    2010-02-01T23:59:59.000Z

    East Fork Poplar Creek (EFPC) in Oak Ridge, Tennessee, has been heavily contaminated with mercury (also referred to as Hg) since the 1950s as a result of historical activities at the U.S. Department of Energy (DOE) Y-12 National Security Complex (formerly the Oak Ridge Y-12 Plant and hereinafter referred to as Y-12). During the period from 1950 to 1963, spills and leaks of elemental mercury (Hg{sup 0}) contaminated soil, building foundations, and subsurface drainage pathways at the site, while intentional discharges of mercury-laden wastewater added 100 metric tons of mercury directly to the creek (Turner and Southworth 1999). The inventory of mercury estimated to be lost to soil and rock within the facility was 194 metric tons, with another estimated 70 metric tons deposited in floodplain soils along the 25 km length of EFPC (Turner and Southworth 1999). Remedial actions within the facility reduced mercury concentrations in EFPC water at the Y-12 boundary from > 2500 ng/L to about 600 ng/L by 1999 (Southworth et al. 2000). Further actions have reduced average total mercury concentration at that site to {approx}300 ng/L (2009 RER). Additional source control measures planned for future implementation within the facility include sediment/soil removal, storm drain relining, and restriction of rainfall infiltration within mercury-contaminated areas. Recent plans to demolish contaminated buildings within the former mercury-use areas provide an opportunity to reconstruct the storm drain system to prevent the entry of mercury-contaminated water into the flow of EFPC. Such actions have the potential to reduce mercury inputs from the industrial complex by perhaps as much as another 80%. The transformation and bioaccumulation of mercury in the EFPC ecosystem has been a perplexing subject since intensive investigation of the issue began in the mid 1980s. Although EFPC was highly contaminated with mercury (waterborne mercury exceeded background levels by 1000-fold, mercury in sediments by more than 2000-fold) in the 1980s, mercury concentrations in EFPC fish exceeded those in fish from regional reference sites by only a little more than 10-fold. This apparent low bioavailability of mercury in EFPC, coupled with a downstream pattern of mercury in fish in which mercury decreased in proportion to dilution of the upstream source, lead to the assumption that mercury in fish would respond to decreased inputs of dissolved mercury to the stream's headwaters. However, during the past two decades when mercury inputs were decreasing, mercury concentrations in fish in Lower EFPC (LEFPC) downstream of Y-12 increased while those in Upper EFPC (UEFPC) decreased. The key assumption of the ongoing cleanup efforts, and concentration goal for waterborne mercury were both called into question by the long-term monitoring data. The large inventory of mercury within the watershed downstream presents a concern that the successful treatment of sources in the headwaters may not be sufficient to reduce mercury bioaccumulation within the system to desired levels. The relative importance of headwater versus floodplain mercury sources in contributing to mercury bioaccumulation in EFPC is unknown. A mercury transport study conducted by the Tennessee Valley Authority (TVA) in 1984 estimated that floodplain sources contributed about 80% of the total annual mercury export from the EFPC system (ORTF 1985). Most of the floodplain inputs were associated with wet weather, high flow events, while much of the headwater flux occurred under baseflow conditions. Thus, day-to-day exposure of biota to waterborne mercury was assumed to be primarily determined by the Y-12 source. The objective of this study was to evaluate the results of recent studies and monitoring within the EFPC drainage with a focus on discerning the magnitude of floodplain mercury sources and how long these sources might continue to contaminate the system after headwater sources are eliminated or greatly reduced.

  17. Report on the biological monitoring program for Bear Creek at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, 1989-1994

    SciTech Connect (OSTI)

    Hinzman, R.L. [ed.] [ed.; Beauchamp, J.J.; Cada, G.F.; Peterson, M.J. [and others] [and others

    1996-04-01T23:59:59.000Z

    The Bear Creek Valley watershed drains the area surrounding several closed Oak Ridge Y-12 Plant waste disposal facilities. Past waste disposal practices in the Bear Creek Valley resulted in the contamination of Bear Creek and consequent ecological damage. Ecological monitoring by the Biological Monitoring and Abatement Program (BMAP) was initiated in the Bear Creek watershed in May 1984 and continues at present. Studies conducted during the first year provided a detailed characterization of the benthic invertebrate and fish communities in Bear Creek. The initial characterization was followed by a biological monitoring phase in which studies were conducted at reduced intensities.

  18. Photographs on front cover (clockwise, from upper left): (upper left) Visible mercury at contact between alluvium and slate bedrock, Sailor Flat Mine, Greenhorn Creek drainage, Nevada County, California; total length of ruler is

    E-Print Network [OSTI]

    at contact between alluvium and slate bedrock, Sailor Flat Mine, Greenhorn Creek drainage, Nevada County

  19. Atmospheric Mercury Concentrations Near Salmon Falls Creek Reservoir - Phase 1

    SciTech Connect (OSTI)

    M. L. Abbott

    2005-10-01T23:59:59.000Z

    Elemental and reactive gaseous mercury (EGM/RGM) were measured in ambient air concentrations over a two-week period in July/August 2005 near Salmon Falls Creek Reservoir, a popular fishery located 50 km southwest of Twin Falls, Idaho. A fish consumption advisory for mercury was posted at the reservoir in 2002 by the Idaho Department of Health and Welfare. The air measurements were part of a multi-media (water, sediment, precipitation, air) study initiated by the Idaho Department of Environmental Quality and the U.S. Environmental Protection Agency (EPA) Region 10 to identify potential sources of mercury contamination to the reservoir. The sampling site is located about 150 km northeast of large gold mining operations in Nevada, which are known to emit large amounts of mercury to the atmosphere (est. 2,200 kg/y from EPA 2003 Toxic Release Inventory). The work was co-funded by the Idaho National Laboratory’s Community Assistance Program and has a secondary objective to better understand mercury inputs to the environment near the INL, which lies approximately 230 km to the northeast. Sampling results showed that both EGM and RGM concentrations were significantly elevated (~ 30 – 70%, P<0.05) compared to known regional background concentrations. Elevated short-term RGM concentrations (the primary form that deposits) were likely due to atmospheric oxidation of high EGM concentrations, which suggests that EGM loading from upwind sources could increase Hg deposition in the area. Back-trajectory analyses indicated that elevated EGM and RGM occurred when air parcels came out of north-central and northeastern Nevada. One EGM peak occurred when the air parcels came out of northwestern Utah. Background concentrations occurred when the air was from upwind locations in Idaho (both northwest and northeast). Based on 2003 EPA Toxic Release Inventory data, it is likely that most of the observed peaks were from Nevada gold mine sources. Emissions from known large natural mercury sources in that area cannot account for the observed EGM peaks due to their diffuse source geometry and the large (170 km) transport distance involved. The EGM peak originating from northwestern Utah air may be from three known mercury sources west of Salt Lake City (Kennecott, US Magnesium, Clean Harbors Aragonite) and/or the 1600 MW coal-fired Intermountain Power plant near Delta. However, the relative importance of these short-term peaks for long-term watershed mercury loading (critical factor affecting fish concentrations) is not known, and there is a need to better quantify the annual frequency and magnitude of these different inputs over a longer period of time.

  20. Atmospheric Mercury near Salmon Falls Creek Reservoir in Southern Idaho

    SciTech Connect (OSTI)

    Michael L. Abbott; Jeffrey J. Einerson

    2007-12-01T23:59:59.000Z

    Gaseous elemental mercury (GEM) and reactive gaseous mercury (RGM) were measured over two-week seasonal field campaigns near Salmon Falls Creek Reservoir in south-central Idaho from the summer of 2005 through the fall of 2006 and over the entire summer of 2006 using automated Tekran mercury analyzers. GEM, RGM, and particulate mercury (HgP) were also measured at a secondary site 90 km to the west in southwestern Idaho during the summer of 2006. The study was performed to characterize mercury air concentrations in the southern Idaho area for the first time, estimate mercury dry deposition rates, and investigate the source of observed elevated concentrations. High seasonal variability was observed with the highest GEM (1.91 ± 0.9 ng m-3) and RGM (8.1 ± 5.6 pg m-3) concentrations occurring in the summer and lower values in the winter (1.32 ± 0.3 ng m-3, 3.2 ± 2.9 pg m-3 for GEM, RGM respectively). The summer-average HgP concentrations were generally below detection limit (0.6 ± 1 pg m-3). Seasonally-averaged deposition velocities calculated using a resistance model were 0.034 ± 0.032, 0.043 ± 0.040, 0.00084 ± 0.0017 and 0.00036 ± 0.0011 cm s-1 for GEM (spring, summer, fall, and winter, respectively) and 0.50 ± 0.39, 0.40 ± 0.31, 0.51 ± 0.43 and 0.76 ± 0.57 cm s-1 for RGM. The total annual RGM + GEM dry deposition estimate was calculated to be 11.9 ± 3.3 µg m-2, or about 2/3 of the total (wet + dry) deposition estimate for the area. Periodic elevated short-term GEM (2.2 – 12 ng m-3) and RGM (50 - 150 pg m-3) events were observed primarily during the warm seasons. Back-trajectory modeling and PSCF analysis indicated predominant source directions from the southeast (western Utah, northeastern Nevada) through the southwest (north-central Nevada) with fewer inputs from the northwest (southeastern Oregon and southwestern Idaho).

  1. The 1983 Temperature Gradient and Heat Flow Drilling Project for the State of Washington

    SciTech Connect (OSTI)

    Korosec, Michael A.

    1983-11-01T23:59:59.000Z

    During the Summer of 1983, the Washington Division of Geology and Earth Resources carried out a three-hole drilling program to collect temperature gradient and heat flow information near potential geothermal resource target areas. The project was part of the state-coupled US Department of Energy Geothermal Program. Richardson Well Drilling of Tacoma, Washington was subcontracted through the State to perform the work. The general locations of the project areas are shown in figure 1. The first hole, DNR 83-1, was located within the Green River valley northwest of Mount St. Helens. This site is near the Green River Soda Springs and along the projection of the Mount St. Helens--Elk Lake seismic zone. The other two holes were drilled near Mount Baker. Hole DNR 83-3 was sited about 1/4 km west of the Baker Hot Springs, 10.5 km east of Mount Baker, while hole DNR 83-5 was located along Rocky Creek in the Sulphur Creek Valley. The Rocky Creek hole is about 10 km south-southwest of the peak. Two other holes, DNR 83-2 and DNR 83-4, were located on the north side of the Sulphur Creek Valley. Both holes were abandoned at early stages of drilling because of deep overburden and severe caving problems. The sites were apparently located atop old landslide deposits.

  2. Microsoft Word - Pole_Creek_Acquisition_CX.docx

    Broader source: Energy.gov (indexed) [DOE]

    (Shoshone-Paiute Tribes) to purchase five parcels of land in Owyhee County, Idaho. Fish and Wildlife Project No.: 1995-057-03 Categorical Exclusion Applied (from Subpart D, 10...

  3. Spatial and temporal variation in fish assemblage structure at Village Creek

    E-Print Network [OSTI]

    Moriarty, Loren Joan

    1995-01-01T23:59:59.000Z

    . . . . . . . . . . . 50 22. Length frequency distributions mesohabitat and season. of Gambusia affinis by 59 23. Length frequency distributions mesohabitat and season. of Etheostoma vivax by . . 60 24. Length frequency distributions mesohabitat and season... COLLECTED AT VILLAGE CREEK, PRESENTED IN DESCENDING ORDER OF SITE OCCURRENCE. pecies ypnne a venusta Pimephales vigilax Gambusia affinis Fundulus olivaceus Notropis sabinae Notropis texanus Lepomis macrochirus Etheostoma vivax Labidesthes sicculus...

  4. Geology of the Schep-Panther Creek Area, Mason County, Texas

    E-Print Network [OSTI]

    Bryant, George Frank

    1959-01-01T23:59:59.000Z

    Psiat Posh shale asahor QsrSsa Crash liosstoos asahsr salSs eass&t~ osahsr Rilar f~tiaa CJQOR14N SEMI All of the reoogafssd aaEwrs of the Upper Caabrisa fa the L)?ae uplift oro repreeeated is tho Bebop - yuatber Creek ense lUddle ~ a4 Loser...

  5. The Republican, the Platte and Pumpkin Creek: Current Nebraska Water Policy Issues

    E-Print Network [OSTI]

    Nebraska-Lincoln, University of

    1 The Republican, the Platte and Pumpkin Creek: Current Nebraska Water Policy Issues J. David Aiken-appropriated river basins, and has done so in much of the Republican, North Platte, and Central Platte river basins. However, the 1997 Platte River Cooperative Agreement and the 2002 settlement of the RRC litigation have

  6. EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

  7. Proceedings of the Conference on Coastal Watersheds:The Caspar Creek Story

    E-Print Network [OSTI]

    Standiford, Richard B.

    Proceedings of the Conference on Coastal Watersheds:The Caspar Creek Story May 6, 1998 Ukiah. 1998. Proceedings of the conference on coastal watersheds: theProceedings of the conference on coastal watersheds: theProceedings of the conference on coastal watersheds: theProceedings of the conference

  8. Influence of the Blue Mesa Reservoir on the Red Creek Landslide, Colorado

    E-Print Network [OSTI]

    Influence of the Blue Mesa Reservoir on the Red Creek Landslide, Colorado SCOTT R. WALKER URS of the Blue Mesa Reservoir submerged approximately 50 percent of the paleolandslide. Some clay layers within of the paleolandslide. Seasonal rapid drawdown of the Blue Mesa Reservoir acts as the trigger for movement, and large

  9. OCEANOGRAPHY Stratigraphic Distribution of Amino Acids in Peats from Cedar Creek

    E-Print Network [OSTI]

    Minnesota, University of

    in Peats from Cedar Creek Bog, Minnesota, and Dismal Swamp, Virginia' F. M. SWAIN, A. BLUMENTALS, AND R the bog waters and waters squeezed from the peats. Attempts to detect proteins in these substances by means of paper electrophoresis were unsuccessful. Fibrous proteins may be present, however. In both peat

  10. Environmental evaluation and restoration plan of the Hoe Creek Underground Coal Gasification Site, Wyoming: Topical report

    SciTech Connect (OSTI)

    Barteaux, W.L.; Berdan, G.L.; Lawrence, J.

    1986-09-01T23:59:59.000Z

    Three underground coal gasification (UCG) experiments were conducted by Lawrence Livermore National Laboratory (LLNL) at the Hoe Creek Site, Wyoming; the Hoe Creek I experiment was conducted in 1976, the Hoe Creek II experiment in 1977, and the Hoe Creek III experiment in 1979. These experiments have had an impact on the land and groundwater quality at the site, and the Department of Energy (DOE) has requested that Western Research Institute (WRI) develop and implement a site restoration plan. The purpose of the plan is to restore the site to conditions being negotiated with the Wyoming Department of Environmental Quality (WDEQ). To prepare for developing a plan, WRI compiled background information on the site. The geologic and hydrologic characteristics of the site were determined, and the water quality data were analyzed. Modelling the site was considered and possible restoration methods were examined. Samples were collected and laboratory tests were conducted. WRI then developed and began implementing a field-scale restoration test. 41 refs, 46 figs., 13 tabs.

  11. Groundwater restoration field test at the Hoe Creek underground coal gasification site

    SciTech Connect (OSTI)

    Nordin, J.S.; Barrash, W.; Nolan, B.T.

    1988-02-01T23:59:59.000Z

    Three underground coal gasification burns were conducted at the Hoe Creek Site in the Powder River Basin. Some contaminants were released in the groundwater. The Department of Energy (DOE) analyzed the water from a network of wells. Two million gallons of groundwater were pumped from wells adjacent to the Hoe Creek II underground coal gasification cavity, passed through filters and carbon adsorbers, and reinjected into the cavity. Phenol was the target compound of the water treatment system. The phenol concentration pumped from well WS-10 decreased from 974 parts per billion (ppB) when treatment began on July 2, 1987, to about 200 ppB when treatment ceased on August 29, 1987. Phenol concentrations pumped from well WS-22 fluctuated during the tests, but they decreased to the 150 to 200 ppB range by the time treatment was terminated. The phenol concentration of treated water reinjected into the Hoe Creek II cavity was below detectable limits (less than 20 ppB). Pumping rates were about 18 gallons per minute (gpm) from well WS-10 and 6 to 8 gpm from well WS-22. Hoe Creek is located approximately 20 miles southwest of Gillette, Wyoming. 12 refs., 5 figs., 8 tabs.

  12. Seneca Creek Associates, LLC Wood Resources International, LLC "Illegal" Logging and Global Wood Markets

    E-Print Network [OSTI]

    Seneca Creek Associates, LLC Wood Resources International, LLC "Illegal" Logging and Global Wood@aol.com; hekstrom@wri-ltd.com October, 2004 #12;Page ES - 1 Illegal Logging and Global Wood Markets: The Competitive, LLC Executive Summary Illegal logging has been high on the agenda, if not directly at the center

  13. Seneca Creek Associates, LLC Wood Resources International, LLC "Illegal" Logging and Global Wood Markets

    E-Print Network [OSTI]

    Seneca Creek Associates, LLC Wood Resources International, LLC SUMMARY "Illegal" Logging and Global Resources International, LLC Illegal Logging and Global Wood Markets: The Competitive Impacts on the U.S. Wood Products Industry1 Summary Study Objectives Illegal logging and illegal forest activities, in one

  14. Development and chemical quality of a ground-water system in cast overburden as the Gibbons Creek Lignite Mine

    E-Print Network [OSTI]

    Borbely, Evelyn Susanna

    1988-01-01T23:59:59.000Z

    -water conditions which develop in response to surface mining. TMPA has supported research at the Gibbons Creek Lignite Mine in order to meet the needs of mine develop- ment and permitting, Most of the data on ground-water conditions 1n reclaimed spoil has been... on the west by the Navasota River, on the south by Gibbons Creek, and on the north by State Highway 30 (Figure 1). This area includes the Gibbons Creek Steam Electric Station. Lignite is extracted from two pits within the permit boundary, termed the A...

  15. A QUASITHETA PRODUCT IN RAMANUJAN'S LOST NOTEBOOK BRUCE C. BERNDT 1 , HENG HUAT CHAN, AND ALEXANDRU ZAHARESCU

    E-Print Network [OSTI]

    Berndt, Bruce C.

    A QUASI­THETA PRODUCT IN RAMANUJAN'S LOST NOTEBOOK BRUCE C. BERNDT 1 , HENG HUAT CHANF27; Secondary, 33D10, 33C05. 1 #12; 2 BRUCE C. BERNDT, HENG HUAT CHAN, AND ALEXANDRU ZAHARESCU

  16. Initial Results from the Lost Alpha Diagnostics on Joint European Torus

    SciTech Connect (OSTI)

    Darrow, Doug; Cecil, Ed; Ellis, Bob; Fullard, Keith; Hill, Ken; Horton, Alan; Kiptily, Vasily; Pedrick, Les; Reich, Matthias

    2007-07-25T23:59:59.000Z

    Two devices have been installed in the Joint European Torus (JET) vacuum vessel near the plasma boundary to investigate the loss of energetic ions and fusion products in general and alpha particles in particular during the upcoming JET experiments. These devices are (i) a set of multichannel thin foil Faraday collectors, and (ii) a well collimated scintillator which is optically connected to a charge-coupled device. Initial results, including the radial energy and poloidal dependence of lost ions from hydrogen and deuterium plasmas during the 2005–06 JET restart campaign, will be presented.

  17. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

  18. Progress in two major CCPI projects

    SciTech Connect (OSTI)

    NONE

    2007-07-01T23:59:59.000Z

    Two projects under the US Department of Energy (DOE) sponsored Clean Coal Power initiative have made significant progress in demonstrating new technologies to remove mercury from coal and enhance use of low-Btu lignite coals while increasing energy efficiency. The Wisconsin Electricity Power Company is demonstrating the TOXECON{trademark} mercury control process at its Presque Isle Power Plant near Marquette, Michigan, while Great River Energy (GRE) is showing the viability of lignite fuel enhancement at its Coal Creek Station in Underwood, North Dakota. Both projects were awarded in 2004 under Round I of the Clean Coal Power Initiative. Elsewhere in the program, six projects are in various phases of planning or operation. Plans for a third round under the CCPI were announced on May 23, 2007. 2 figs.

  19. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    & Figures: Budget: Ł51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on SiteProject Fact Sheet Project Update: Project Brief: The concept of the new scheme is to redevelop Gardens project http://www.imperial.ac.uk/princesgardens/ Construction Project Team: Project Facts

  20. ARCHAEOLOGY, LATE-QUATERNARY LANDSCAPE EVOLUTION, AND ENVIRONMENTAL CHANGE IN THE UPPER DRIFTWOOD CREEK BASIN, BARBER COUNTY, KANSAS

    E-Print Network [OSTI]

    Kessler, Nicholas Victor

    2010-12-09T23:59:59.000Z

    This study focused on valley fills in the upper Driftwood Creek basin, a 3rd order drainage network in south-central Kansas to determine the geologic potential for stratified cultural material and to reconstruct a record of Late...

  1. Lateral Continuity of the Eagle Ford Group Strata in Lozier Canyon and Antonio Creek, Terrell County, Texas

    E-Print Network [OSTI]

    Gardner, Rand D

    2013-09-24T23:59:59.000Z

    simplistic assumptions about relevant horizontal reservoir heterogeneities can lead to sub-optimal or uneconomical exploitation. High-resolution correlation of individual beds in the Eagle Ford Group over several miles in Lozier Canyon and Antonio Creek...

  2. Saeltzer Dam Removal on Clear Creek 11 years later: An assessment of upstream channel changes since the dam's removal

    E-Print Network [OSTI]

    Simons, Crystal; Walker, Katelyn; Zimring, Mark

    2011-01-01T23:59:59.000Z

    Boulder BLDR Bedrock BDRK Dam Rubble DMRB Table B1. 2011pages. Brown, M. (n.d. ). Clear Creek—McCormick-Saeltzer DamRemoval: Dam removal re-opens spring run salmon habitat. US

  3. MESOHABITAT USE AND COMMUNITY STRUCTURE OF BRAZOS RIVER FISHES IN THE VICINITY OF THE PROPOSED ALLENS CREEK RESERVOIR 

    E-Print Network [OSTI]

    Gelwick, Frances P.; Li, Raymond Y.

    2003-01-01T23:59:59.000Z

    MESOHABITAT USE AND COMMUNITY STRUCTURE OF BRAZOS RIVER FISHES IN THE VICINITY OF THE PROPOSED ALLENS CREEK RESERVOIR Submitted to: Texas Water Development Board P.O. Box 13231, Capitol Station 1700 N. Congress Avenue Austin...

  4. Water quality and chemistry of an alpine stream: a case study of Sneffels Creek, Yankee Boy Basin, Colorado

    E-Print Network [OSTI]

    Heggie, Tracey Michelle

    2002-01-01T23:59:59.000Z

    reduction potential (orp) were measured at forty-one study sites along Sneffels Creek. Temperature, tds, conductivity, and orp are positively correlated and show an inverse relationship with elevation and channel width. Turbidity is highly variable along...

  5. Project Funding

    Broader source: Energy.gov [DOE]

    Federal energy projects require funding to generate results. Carefully matching available funding options with specific project needs can make the difference between a stalled, unfunded project and a successful project generating energy and cost savings.

  6. Archaeological investigations at the Kent Creek site (41HL66): evidence of Mogollon influence on the Southern Plains

    E-Print Network [OSTI]

    Cruse, Jimmy Brett

    1989-01-01T23:59:59.000Z

    in Hall County, Texas. . . . . 4 2. Contour map of the Kent Creek site. 3. Relief map of the Llano Estacado and surrounding areas. . . , 10 4. Cultural chronology chart of the Southern Plains and eastern New Mexico. 19 5. Map of the Llano Estacado... ideas about houses and horticulture. Evidence which may support Hughes' suggestion comes from archaeological excavations recently conducted at the Kent Creek site (41HL66) located in Hall County of the southeastern Texas panhandle (Figure 1...

  7. Hepatics of the Turkey Creek Unit of the Big Thicket National Preserve: a floristic and ecological study

    E-Print Network [OSTI]

    Bazan, Evangelina

    1980-01-01T23:59:59.000Z

    Botanically, The Turkey Creek Unit is of particular interest be- cause it includes 10 distinct vascular plant associations, according to a recent vegetation analysis of the Big Thicket National Preserve by Harcombe and Marks (1979). The unit was selected... in the Turkey Creek Unit of the Big Thicket National Preserve with approximate acreage and corres- ponding percent area occuppied. Asterisks indicate associations not sampled. (After Harcombe & Marks, 1979. ) Association Acreage Percent * Upland pine (UP...

  8. 3-D sedimentological and geophysical studies of clastic reservoir analogs: Facies architecture, reservoir properties, and flow behavior within delta front facies elements of the Cretaceous Wall Creek Member, Frontier Formation, Wyoming

    SciTech Connect (OSTI)

    Janok P. Bhattacharya; George A. McMechan

    2007-02-16T23:59:59.000Z

    This project examined the internal architecture of delta front sandstones at two locations within the Turonian-age Wall Creek Member of the Frontier Formation, in Wyoming. The project involved traditional outcrop field work integrated with core-data, and 2D and 3D ground penetrating radar (GPR) imaging from behind the outcrops. The fluid-flow engineering work, handled through a collaborative grant given to PI Chris White at LSU, focused on effects on fluid flow of late-stage calcite cement nodules in 3D. In addition to the extensive field component, the work funded 2 PhD students (Gani and Lee) and resulted in publication of 10 technical papers, 17 abstracts, and 4 internal field guides. PI Bhattacharya also funded an additional 3 PhD students that worked on the Wall Creek sandstone funded separately through an industrial consortium, two of whom graduated in the fall 2006 ((Sadeque and Vakarelov). These additional funds provided significant leverage to expand the work to include a regional stratigraphic synthesis of the Wall Creek Member of the Frontier Formation, in addition to the reservoir-scale studies that DOE directly funded. Awards given to PI Bhattacharya included the prestigious AAPG Distinguished Lecture Award, which involved a tour of about 25 Universities and Geological Societies in the US and Canada in the fall of 2005 and Spring of 2006. Bhattacharya gave two talks, one entitled “Applying Deltaic and Shallow Marine Outcrop Analogs to the Subsurface”, which highlighted the DOE sponsored work and the other titled “Martian River Deltas and the Origin of Life”. The outcrop analog talk was given at about 1/2 of the venues visited.

  9. Hood River Fish Habitat Project; Confederated Tribes of the Warm Springs Reservation of Oregon, Annual Report 2002-2003.

    SciTech Connect (OSTI)

    Vaivoda, Alexis

    2004-02-01T23:59:59.000Z

    This report summarizes the project implementation and monitoring of all habitat activities in the Hood River basin that occurred over the October 1, 2002 to September 30, 2003 period (FY 03). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 03. A description of the progress during FY 03 and reasoning for deviation from the original tasks and timeline are provided. OBJECTIVE 1 - Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administrative oversight and coordination of the habitat statement of work, budget, subcontracts, personnel, implementation, and monitoring was provided. OBJECTIVE 2 - Continue to coordinate, implement, and revise, as needed, the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document was utilized for many purposes including: drafting the Watershed Action Plan (Coccoli, 2002), ranking projects for funding, and prioritizing projects to target in the future. This document has been reviewed by many, including stakeholders, agencies, and interested parties. The Hood River Watershed Group Coordinator and author of the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan, Holly Coccoli, has updated and revised the plan. Changes will be reflected in the Hood River Subbasin Plan, and after submission of the Subbasin Plan, a formally revised version of the Monitoring Plan will be put out for review. This will more specifically address changes in the Hood River subbasin since 2000, and reflect changes to fish habitat and needs in the Hood River subbasin regarding monitoring. OBJECTIVE 3 - Evaluate and monitor the habitat, accessibility, and presence of winter steelhead, coho salmon, and resident trout upstream of the Middle Fork Irrigation District water sources on Evans Creek. Through this project, BPA funded the Middle Fork Irrigation District (MFID) a total of $194,000 in FY 03 for the Glacier Ditch- Evans Creek project. BPA funds accounted for approximately 30% of the project while the remaining 70% was cost-shared by the MFID, the US Forest Service, and the Oregon Watershed Enhancement Board. The MFID operated irrigation diversions on Evans Creek (Hutson pond RM 4.0 and the Evans Creek diversion RM 5.5), a tributary to the East Fork Hood River. Both diversions had inadequate upstream fish passage, and utilized Evans Creek to transport Eliot Branch water to distribute irrigation water lower in the basin. This project consisted of: piping a portion of the Glacier ditch to create a pressurized irrigation pipeline system, piping the Hutson extension, removing the culvert on Evans Creek near the Glacier ditch, removing the culvert above the Hutson pond, revegetating the disturbed areas, and providing adequate and approved fish passage on Evans Creek. Prior to any work, Brian Connors with MFID completed a NEPA checklist. Some of the key regulatory points of this project included wetland delineations, a cultural resources survey, and consultations with NOAA Fisheries, U.S. Fish and Wildlife, Oregon Department of Fish and Wildlife (ODFW), and the U.S. Army Corps of Engineers. This project will eliminate the overflow of silty water into Evans Creek and West Fork Evans Creek. Upon completion of this project, access to 2.5 miles of winter steelhead, coho salmon, and resident trout habitat will be restored. Elimination of the interbasin transfer of water will discontinue the conveyance of silty Eliot Branch water into clear East Fork tributaries. Additionally, less water taken from Coe Branch, Eliot Branch, and Laurance Lake which will benefit listed steelhead and bull trout. The Glacier Ditch provided irrigation water from the Eliot Branch to upper valley orchards and agriculture for more than 100 years. The Glacier Ditch served approximately 1,438 acres with 18 cfs of water. The Glacier Ditch portion of this project

  10. Pond Creek coal seam in eastern Kentucky - new look at an old resource

    SciTech Connect (OSTI)

    Hower, J.C.; Pollock, J.D.; Klapheke, J.G.

    1986-05-01T23:59:59.000Z

    The Middle Pennsylvania/Westphalian B Pond Creek Coal is an important low-sulfur resource in Pike and Martin Counties, Kentucky. The Breathitt Formation seam, also known as the lower Elkhorn coal, accounted for nearly 40% of Pike County's 1983 production of 22 million tons. Although the coal is nearly mined out through central Pike County, substantial reserves still exist in the northern part of the county. Past studies of the seam by the US Bureau of Mines concentrated on the utility of the seam as a coking blend, with additional consideration of the megascopic and microscopic coal petrology. The authors research has focused on the regional variations in the Pond Creek seam, with emphasis on the petrographic variations.

  11. The Hanna and Hoe Creek underground coal gasification test sites: Status report, (June 1986-June 1987)

    SciTech Connect (OSTI)

    Berdan, G.L.; Nolan, B.T.; Barteaux, W.L.; Barrash, W.

    1987-06-01T23:59:59.000Z

    To comply with a cooperative agreement with the U.S. Department of Energy (DOE), the Western Research Institute (WRI) is required to submit an annual report summarizing the status of environmentally related work performed by WRI at the Hanna and Hoe Creek underground coal gasification (UCG) sites. The following is a summary of work performed at these two sites from June 1986 to June 1987. Several tasks for restoring the water quailty at Hoe Creek were: (1) groundwater treatment demonstration (1986); (2) bench-scale carbon adsorption experiments (1987); (3) design of the scaled-up treatment system (1987); (4) well-pumping test (1987). A summary of the results of each task is presented. 6 refs., 8 figs., 4 tabs.

  12. Geology of the Bee Branch-Mill Creek area, Mason County, Texas 

    E-Print Network [OSTI]

    Miller, George Howard

    1957-01-01T23:59:59.000Z

    . andstcns member. ?organ Creek lmesrcne res?er . Pomrt Ie rn shale m, . mber . Bio? '", . one ct' th . "oint Peck . hale '&au Saba limestcno member . Ordoeician sy;tem . 12 13 14 15 15 16 16 17 19 Ellen? urger group. Mississippian system..., Chappel '"creation. Barnet t shale. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 4 ~ ~ 25 26 Pennsylvanian system. ~ ~ ~ ~ ~ ~ 28 N*rble Falls group 'I ~ ~ ~ ~ ~ ~ ~ ~ ~ &mithsick 'c rr, . * Lic n. \\ ~ Cretaceous system . Quaternarr sy ten...

  13. Contribution of valley-side erosion to sedimentation problems in Wolf Pen Creek, College Station, Texas

    E-Print Network [OSTI]

    Wilson, Rachel Suzanne

    2000-01-01T23:59:59.000Z

    exist all along the Gulf Coast and in many other regions of the country. Therefore, the problems associated with Wolf Pen Creek are extremely important and are of national significance. Time and time again, the geology is neglected in urban river... hardwoods can be found along the Navasota River lowland. An open stand of postjack oaks (guercus stellata) and blackjack oaks (Quercus rnarilandica) and a ground cover of tall grasses characterize the post-oak savannah. 16 The Lufkin, Edge, and Tabor...

  14. Environmental assessment for the Hoe Creek underground, Coal Gasification Test Site Remediation, Campbell County, Wyoming

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) has prepared this EA to assess environmental and human health Issues and to determine potential impacts associated with the proposed Hoe Creek Underground Coal Gasification Test Site Remediation that would be performed at the Hoe Creek site in Campbell County, Wyoming. The Hoe Creek site is located south-southwest of the town of Gillette, Wyoming, and encompasses 71 acres of public land under the stewardship of the Bureau of Land Management. The proposed action identified in the EA is for the DOE to perform air sparging with bioremediation at the Hoe Creek site to remove contaminants resulting from underground coal gasification (UCG) experiments performed there by the DOE in the late 1970s. The proposed action would involve drilling additional wells at two of the UCG test sites to apply oxygen or hydrogen peroxide to the subsurface to volatilize benzene dissolved in the groundwater and enhance bioremediation of non-aqueous phase liquids present in the subsurface. Other alternatives considered are site excavation to remove contaminants, continuation of the annual pump and treat actions that have been used at the site over the last ten years to limit contaminant migration, and the no action alternative. Issues examined in detail in the EA are air quality, geology, human health and safety, noise, soils, solid and hazardous waste, threatened and endangered species, vegetation, water resources, and wildlife. Details of mitigative measures that could be used to limit any detrimental effects resulting from the proposed action or any of the alternatives are discussed, and information on anticipated effects identified by other government agencies is provided.

  15. Ophir Creek Space Heating Low Temperature Geothermal Facility | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri: EnergyExcellenceOfficeOhio: EnergyProjects/SearchInformation

  16. The lost and unaccounted-for gas: Chasing the ``Silver Bullet``

    SciTech Connect (OSTI)

    Feldman, R. [Arthur Andersen, Houston, TX (United States)

    1998-07-01T23:59:59.000Z

    As the competitive and financial stakes increase in today`s natural gas market, pipeline companies are focusing increased attention on lost and unaccounted for gas (L and U) both as a significant element in bottom-line financial gains and losses, and as a major factor in interstate pipeline companies` rates to customers. However, many companies are finding that the Silver Bullet approach to L and U of the pre-deregulation past--locating a single, large problem or station error and correcting it--is at worst a misfire and at best only a short-term, partial solution. The paper discusses the scope of L and U losses, measurement errors, how companies are addressing losses, what a Silver Bullet is, alternative approaches, and costs.

  17. Portsmouth/Paducah Project Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ft.). The builder also constructed sandstone rubble retaining walls, providing erosion control for the roadbed on either side of the creek. This was a necessary component of the...

  18. EA-1957: Cabin Creek Biomass Facility, Placer County, California

    Broader source: Energy.gov [DOE]

    DOE is proposing to provide funding to Placer County, California to construct and operate a two-megawatt wood-to-energy biomass facility at the Eastern Regional Materials Recovery Facility (MRF) and Landfill in unincorporated Placer County. The wood?to?energy biomass facility would use a gasification technology. The fuel supply for the proposed project would be solely woody biomass, derived from a variety of sources including hazardous fuels residuals, forest thinning and harvest residuals, and Wildland Urban Interface sourced waste materials from residential and commercial property defensible space clearing and property management activities. NOTE: After review of a final California Environmental Quality Act Environmental Impact Report, DOE has determined that preparation of an EA is not necessary. The propsed action fits within DOE's categorical exclusion B5.20. Therefore, this EA is cancelled.

  19. A review of "Satan's Poetry: Fallenness and the Poetic Tradition in Paradise Lost" by Danielle A. St. Hilaire

    E-Print Network [OSTI]

    Swann, Adam

    2013-01-01T23:59:59.000Z

    that prompted them. Danielle A. St. Hilaire. Satan?s Poetry: Fallenness and the Poetic Tradition in Paradise Lost. Pittsburgh, PA: Duquesne University Press, 2012. x + 246 pp. $58.00. #25;#31;#27;#22;#31;#18; #26; #28;#8;#28;#7; #21;#18;#28;#29;#29;, #23...;#29;#22;#27;#31;#25;#21;#22;#20;#26; #24;#19; #6;#30;#28;#21;#6;#24;#18;. It is becoming increasingly challenging to #15;nd things unattempted yet in Paradise Lost criticism, and nowhere is this truer than in studies of Satan and the fallen state. St. Hilaire is under no illusions...

  20. Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY 291 Project Information Date: 31 12010 Contractor Code: Project Overview In order to...

  1. How is open solar magnetic flux lost over the solar cycle? M. J. Owens,1,2

    E-Print Network [OSTI]

    Lockwood, Mike

    How is open solar magnetic flux lost over the solar cycle? M. J. Owens,1,2 N. U. Crooker,3 and M 2011. [1] The Sun's open magnetic field, magnetic flux dragged out into the heliosphere by the solar wind, varies by approximately a factor of 2 over the solar cycle. We consider the evolution of open

  2. Fairness lost in immigration reform; Never before have sweeping changes to policies been undertaken with so little public debate or

    E-Print Network [OSTI]

    Handy, Todd C.

    Fairness lost in immigration reform; Never before have sweeping changes to policies been undertaken reform is unique neither in terms of its controversial substance nor in its lack of meaningful democratic processes. In the past, major immigration reform has typically been the result of parliamentary deliberation

  3. From the Lost Radium Files: Misadventures in the Absence of Training, Regulation, and Accountability

    SciTech Connect (OSTI)

    Aronowitz, Jesse N., E-mail: jesse.aronowitz@umassmemorial.org [Department of Radiation Oncology, University of Massachusetts Medical School, Worcester, Massachusetts (United States); Lubenau, Joel O. [Department of Radiation Oncology, University of Massachusetts Medical School, Worcester, Massachusetts (United States)] [Department of Radiation Oncology, University of Massachusetts Medical School, Worcester, Massachusetts (United States)

    2012-11-15T23:59:59.000Z

    Purpose: Radium was the foundation of brachytherapy in the early decades of the 20th century. Despite being a most precious and perilous substance, it was mislaid with surprising frequency. This essay explores how it was lost, the efforts taken to recover it, and measures instituted to prevent mishandling. Methods and Materials: Review of contemporary literature, government publications, archives, and lay press. Results: Radium is a particularly dangerous substance because of its long half-life, its gaseous daughter (radon), and the high-energy emissions of its decay products. Despite the hazard, it was unregulated for most of the century. Any physician could obtain and administer it, and protocols for safe handling were generally lacking. Change came with appreciation of the danger, regulation, mandated training, and the institution of a culture of accountability. Unfortunately, careless management of medical radionuclides remains a global hazard. Conclusion: Responsible stewardship of radioactive material was not a high priority, for practitioners or the federal government, for much of the 20{sup th} century. As a result, large quantities of radium had gone astray, possibly subjecting the general public to continued radiation exposure. Lessons from the radium era remain relevant, as medical radionuclides are still mishandled.

  4. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  5. Post-Fire Debris-Flow Hazard Assessment of the Area Burned by the 2013 Beaver Creek Fire near Hailey, Central Idaho

    E-Print Network [OSTI]

    Torgersen, Christian

    Post-Fire Debris-Flow Hazard Assessment of the Area Burned by the 2013 Beaver Creek Fire near-flow hazard assessment of the area burned by the 2013 Beaver Creek Fire near Hailey, central Idaho: U­1273 Prepared in cooperation with Blaine County, Idaho #12;#12;Post-Fire Debris-Flow Hazard Assessment

  6. The Pumpkin Creek Watershed Limited Irrigation and No-Till Demonstration Gary L. Stone, Gary W. Hergert, Dean Yonts, Jim Schild, Rex A. Nielson and James Margheim

    E-Print Network [OSTI]

    Nebraska-Lincoln, University of

    in the Panhandle can fit into limited irrigation cropping systems in the Pumpkin Creek Watershed. The NPNRD allowsThe Pumpkin Creek Watershed Limited Irrigation and No-Till Demonstration Gary L. Stone, Gary W irrigation applies less water than is required to meet full evapotranspiration (ET) or irrigation demand

  7. Overview of GRI research at the Rock Creek Site, Black Warrior Basin. Overview of GRI research at Rock Creek: Eight years of cooperative research, coalbed methane shortcourse. Held in Birmingham, Alabama on October 21, 1992. Topical report

    SciTech Connect (OSTI)

    Schraufnagel, R.

    1992-10-01T23:59:59.000Z

    The presentation slides from the October 21, 1992 workshop on coalbed methane exploration and production are assembled in this volume. They illustrate the following discussions Overview of GRI Research at Rock Creek: Eight Years of Cooperative Research, Drilling and Completing Coalbed to the Formation: Perforations vs. Slotting, Coalbed Methane Well Testing in the Warrior Basin, Reservoir Engineering: A Case Study at Rock Creek, Fraccing of Multiple Thin Seams: Considerations and Constraints, Implementing Coal Seam Stimulations: Requirements for Successful Treatments, Coal-Fluid Interactions, Mine-Through Observations of Coal Seam Stimulations: Reality vs. Theory, and Improving Gas Production: Techniques of Operations.

  8. Overview of GRI research at the Rock Creek Site, Black Warrior Basin. Overview of GRI research at Rock Creek: Eight years of cooperative research, coalbed methane shortcourse. Held in Abingdon, Virginia on October 23, 1992. Topical report

    SciTech Connect (OSTI)

    Schraufnagel, R.

    1992-10-01T23:59:59.000Z

    The presentation slides from the October 23, 1992 workshop on coalbed methane exploration and production are assembled in this volume. They illustrate the following discussions: Overview of GRI Research at Rock Creek: Eight Years of Cooperative Research, Drilling and Completing Coalbed Methane Wells: Techniques for Fragile Formations, Connecting the Wellborne to the Formation: Perforations vs. Slotting, Coalbed Methane Well Testing in the Warrior Basin, Reservoir Engineering: A Case Study at Rock Creek, Fraccing of Multiple Thin Seams: Considerations and Constraints, Implementing Coal Seam Stimulations: Requirements for Successful Treatments, Coal-Fluid Interactions, Mine-Through Observations of Coal Seam Stimulations: Reality vs. Theory, and Recompleting Coalbed Methane Wells: The Second Try at Success.

  9. Sediment and radionuclide transport in rivers: radionuclide transport modeling for Cattaraugus and Buttermilk Creeks, New York

    SciTech Connect (OSTI)

    Onishi, Y.; Yabusaki, S.B.; Kincaid, C.T.; Skaggs, R.L.; Walters, W.H.

    1982-12-01T23:59:59.000Z

    SERATRA, a transient, two-dimensional (laterally-averaged) computer model of sediment-contaminant transport in rivers, satisfactorily resolved the distribution of sediment and radionuclide concentrations in the Cattaraugus Creek stream system in New York. By modeling the physical processes of advection, diffusion, erosion, deposition, and bed armoring, SERATRA routed three sediment size fractions, including cohesive soils, to simulate three dynamic flow events. In conjunction with the sediment transport, SERATRA computed radionuclide levels in dissolved, suspended sediment, and bed sediment forms for four radionuclides (/sup 137/Cs, /sup 90/Sr, /sup 239/ /sup 240/Pu, and /sup 3/H). By accounting for time-dependent sediment-radionuclide interaction in the water column and bed, SERATA is a physically explicit model of radionuclide fate and migration. Sediment and radionuclide concentrations calculated by SERATA in the Cattaraugus Creek stream system are in reasonable agreement with measured values. SERATRA is in the field performance phase of an extensive testing program designed to establish the utility of the model as a site assessment tool. The model handles not only radionuclides but other contaminants such as pesticides, heavy metals and other toxic chemicals. Now that the model has been applied to four field sites, including the latest study of the Cattaraugus Creek stream system, it is recommended that a final model be validated through comparison of predicted results with field data from a carefully controlled tracer test at a field site. It is also recommended that a detailed laboratory flume be tested to study cohesive sediment transport, deposition, and erosion characteristics. The lack of current understanding of these characteristics is one of the weakest areas hindering the accurate assessment of the migration of radionuclides sorbed by fine sediments of silt and clay.

  10. Uranium in the Oatman Creek granite of Central Texas and its economic potential 

    E-Print Network [OSTI]

    Conrad, Curtis Paul

    1982-01-01T23:59:59.000Z

    potential uranium source. Th1s study focuses on an 80 acre outcrop of the Oatman Creek granite known as Bear Mountain, in Gillespie County, Texas. The gran1te is a medium-grained, gray to pink rock. Nodal analysis indicates the composit1on 1s 35. 5... economically feasible because of the relatively low concentration of uranium in most igneous rocks. Recent studies ot uranium have been confined largely to the origin and development of uranium deposits in sedimentary rocks, namely sandstones. In the futur e...

  11. Hydrocarbon trapping mechanisms in the Miller Creek area of the Powder River Basin, Wyoming

    E-Print Network [OSTI]

    Armstrong, Jennifer Ann

    1975-01-01T23:59:59.000Z

    production comes from Lower Cretaceous and Lower Permian sandstones. The horison studied, the Lower Cretaceous Dakota Sandstone, is a thin clastic wedge deposited during the initial Cretaceous transgression oi' the Artie Ocean - Gulf of Mexico seaway over... for the channels end orobable Recerwoir Trigood Lucerne 3 32-AN-66W Regional Pet Inc Corda%1 F-1 9-AN-68M SP -10~ 0 oem-m 50 0 oh'-m SP -10+ 6' 5900 Figure 3, Rlectric Log Profiles of Regional and Reservoir Dakota Sandstones. 10 I Q MILLER CREEK...

  12. The investigation of the Caney Creek shipwreck archaeological site 41MG32

    E-Print Network [OSTI]

    Hedrick, David Layne

    1998-01-01T23:59:59.000Z

    Tribune [MCT], I ~ aeea I. LAKE CHARLES- SERNAR D 2. EDNA-TELFERNER S. PLEDGER 4. 8 RAZORIA-NORWOOD 5. SURFSIDE-VELASCO 6. LIVIA- FRANCI TAG 7, VESTON-PLACEDO S. GALVESTON- ADAMSVILLE e ann I a ukean f SAY c t ro ~ kara aeonn L e... (~aragorda County Tnbune [MCT], August 23, 1945, Section 2:2). Because of the production coming out of Caney Creek, local farmers and plantation owners soon began to pressure the Texas government for improvements to facilitate navigation. Sugar, cotton...

  13. Water quality monitoring at the Hoe Creek test site: review and preliminary conclusions

    SciTech Connect (OSTI)

    Wang, F.T.

    1983-01-01T23:59:59.000Z

    Post-burn monitoring of the ground water near to the Hoe creek underground coal gasification site showed that a broad range of gasification products had been introduced into the water system. Although many of these contaminants were eventually absorbed by the surrounding coal, some chemicals continued to appear in the water in concentrations higher than pre-test levels for several years after gasification. Possible mechanisms by which the contaminants entered the ground water include: (1) leakage of pyrolysis products; (2) post-burn leaching of coal ash and overburden rubble by returning ground water; and (3) dissolution of minerals outside the cavity by the CO/SUB/2 generated during gasification.

  14. Changes in major organic contaminants in the groundwater at the Hoe Creek underground coal gasification site

    SciTech Connect (OSTI)

    Wang, F.; Mead, W.

    1985-08-01T23:59:59.000Z

    The results of groundwater analysis at the Hoe Creek underground coal gasification (UCG) site have indicated that, after gasification, the phenolic compounds and neutral aromatic hydrocarbons decrease more slowly than expected on the basis of our laboratory studies. The field data also fail to confirm the expected inverse relationship between a contaminant's water solubility and the extent to which it is sorbed by surrounding coal. The authors described a mechanism for the deposition of coal pyrolysis products that may help to elucidate the observed behavior of these organic contaminants. 7 refs., 7 figs.

  15. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's ÂŁ20

  16. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    .union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: Ł1,400,000 Funding Source: Capital PlanProject Fact Sheet Project Brief: In the first phase of the Union Building re that it adapts to meet the needs of a changing student body. The re-development plans are grounded in a full

  17. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Facts & Figures: Budget: Ł3,500,000 Funding Source: SRIF III Construction Project Programme: StartProject Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors of work includes: · Building fabric replacement and revised space planning · New mechanical and electrical

  18. The cow creek anticline: an example of disharmonic folding along the front of the Big Horn Mountains

    E-Print Network [OSTI]

    Dransfield, Betsy Jo

    1983-01-01T23:59:59.000Z

    . g. shale). Bucn a config- A 7000 7000 6000 Jm Js Jgs P Pa 6000 5000' 5000 0bI1 4000 C99f 4000 3000 0 Figure 17 ~ Cross-section A-A' i The nose of the Cow Creek Anti- cline shows no volume problems in the subsurface 45 Figure &8... Creek Anticline csr. best be solved. by bedding plane slip in the interbedded shales and limestones oi' the Devonian Jei'ferson Formation, Layer-parallel slip also rel~ ev a ' ocal volume problem in tne synclinal trough at the base oi' the monocline...

  19. The Oak Ridge Y-12 Plant biological monitoring and abatement program for East Fork Poplar Creek

    SciTech Connect (OSTI)

    Loar, J.M.; Adams, S.M.; Allison, L.J.; Giddings, J.M.; McCarthy, J.F.; Southworth, G.R.; Smith, J.G.; Stewart, A.J. (Oak Ridge National Lab., TN (USA); Springborn Bionomics, Inc., Wareham, MA (USA); Oak Ridge National Lab., TN (USA))

    1989-10-01T23:59:59.000Z

    In May 1985, a National Pollutant Discharge Elimination System permit was issued for the Oak Ridge Y-12 Plant, a nuclear weapons components production facility located in Oak Ridge, Tennessee, and operated by Martin Marietta Energy Systems, Inc., for the US Department of Energy. As a condition of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed to demonstrate that the effluent limitations established for the Oak Ridge Y-12 Plant protect the classified uses of the receiving stream (East Fork Poplar Creek), in particular, the growth and propagation of fish and aquatic life, as designated by the Tennessee Department of Health and Environment. A second purpose for the BMAP is to document the ecological effects resulting from implementation of a water pollution control program that will include construction of nine new wastewater treatment facilities over the next 4 years. Because of the complex nature of the effluent discharged to East Fork Poplar Creek and the temporal and spatial variability in the composition of the effluent (i.e., temporal variability related to various pollution abatement measures that will be implemented over the next several years and spatial variability caused by pollutant inputs downstream of the Oak Ridge Y-12 Plant), a comprehensive, integrated approach to biological monitoring was developed for the BMAP. 39 refs., 5 figs., 8 tabs.

  20. Water-quality monitoring at the Hoe Creek test site: review and preliminary conclusions

    SciTech Connect (OSTI)

    Wang, F.T.; Mead, S.W.; Stuermer, D.H.

    1983-04-16T23:59:59.000Z

    It has been shown that underground coal gasification (UCG) may introduce a broad range of residual gasification products into the groundwater of a coal aquifer. Sorption of many contaminants by the coal itself is an important factor in restricting the migration of these contaminants in the groundwater. However, our field studies at the Lawrence Livermore National Laboratory (LLNL) Hoe Creek site in northeastern Wyoming have shown that sorption of organic compounds by coal is not as effective as expected, perhaps because the coal surface area is limited. Furthermore, if severe roof collapse has taken place during gasification, non-coal aquifers located above the gasified coal seam may be interconnected with the coal aquifer. Contaminants may enter these non-coal aquifers, in which sorption is even less effective. The Hoe Creek II and III experiments have enabled us to study the contamination of a sand aquifer located above a gasified coal seam in a hydrological recharge area. Our preliminary results indicate that the water in the overlying sand aquifer is much less contaminated with organic compounds than that in the gasified coal aquifer. In conducting these field investigations, we have also learned valuable lessons concerning a strategy for groundwater monitoring. 21 figures.

  1. Burn cavity growth during the Hoe Creek No. 3 underground coal gasification experiment

    SciTech Connect (OSTI)

    Hill, R.W.

    1981-01-14T23:59:59.000Z

    A detailed history is given of the growth of the burn cavity during the first month of the Hoe Creek No. 3 underground coal gasification experiment near Gillette, Wyoming, in 1979. The changing shape of the cavity with time is inferred from data from three types of instruments installed throughout the experimental zone: (1) thermocouples at various levels in a number of holes, to map temperatures; (2) extensometers at various levels in other holes, to detect motions of the overburden material; and (3) high-frequency electromagnetic (HFEM) scans made between various pairs of holes, to detect cavities and zones of burning coal. Additional data on the final shape of the underground cavity are derived from the results of a core drilling program carried out from the surface after the burn had ended. This study of cavity growth history has contributed significantly to our understanding of how the in situ coal gasification process operates in sites like Hoe Creek. The diagnostic system provided invaluable information on cavity growth and on the interaction between the two coal seams. Some new problems with injection well survival and slag production in oxygen-steam burns were brought out, and the importance of understanding and controlling heat loss mechanisms was amply demonstrated. Although no one system of underground diagnostics can give all of the information needed to fully describe the in situ process, a combination of several diagnostic systems can be used to deduce a self-consistent description.

  2. Water quality monitoring at the Hoe Creek test site: review and preliminary conclusions

    SciTech Connect (OSTI)

    Wang, F.T.; Mead, S.W.; Sturmer, D.H.

    1983-01-01T23:59:59.000Z

    It has been shown that underground coal gasification (UCG) may introduce a broad range of residual products into the groundwater of a coal aquifer. Sorption of many contaminants by the coal itself is an important factor in restricting the migration of these contaminants in the groundwater. However, our field studies at the Lawrence Livermore National Laboratory (LLNL) Hoe Creek site in northeastern Wyoming have shown that sorption of organic compounds by coal is not as effective as expected, perhaps because the coal surface area is limited. Furthermore, if severe roof collapse has taken place during gasification, non-coal aquifers located above the gasified coal seam may become interconnected with the cavity. Contaminants may enter these non-coal aquifers, in which sorption is even less effective. The Hoe Creek II and III experiments have enabled us to study the contamination of a sand aquifer located above a gasified coal seam in a hydrological recharge area. The preliminary results indicate that the water in the overlying sand aquifer is much less contaminated with organic compounds than that in the gasified

  3. Burn cavity growth during the Hoe Creek No. 3 underground-coal-gasification experiment

    SciTech Connect (OSTI)

    Hill, R.W.

    1981-06-08T23:59:59.000Z

    A detailed history is given of the growth of the burn cavity during the first month of the Hoe Creek No. 3 underground coal gasification experiment near Gillette, Wyoming, in 1979. The changing shape of the cavity with time is inferred from data from three types of instruments installed throughout the experimental zone: (1) thermocouples at various levels in a number of holes, to map temperatures; (2) extensometers at various levels in other holes, to detect motions of the overburden material; and (3) high-frequency electromagnetic scans made between various pairs of holes, to detect cavities and zones of burning coal. Additional data on the final shape of the underground cavity is derived from the results of a core drilling program carried out from the surface after the burn had ended. This study of cavity growth history has contributed significantly to our understanding of how the in-situ coal gasification process operates in sites like Hoe Creek. The diagnostic system provided invaluable information on cavity growth and on the interaction between the two coal seams. Some new problems with injection well survival and slag production in oxygen-steam burns were brought out, and the importance of understanding and controlling heat loss mechanisms was amply demonstrated. Although no one system of underground diagnostics can give all of the information needed to fully describe the in-situ process, a combination of several diagnostic systems can be used to deduce a self-consistent description.

  4. Water-quality monitoring at the Hoe Creek test site: review and preliminary conclusions

    SciTech Connect (OSTI)

    Wang, F T; Mead, S W; Stuermer, D H

    1982-05-20T23:59:59.000Z

    It has been shown that underground coal gasification (UCG) may introduce a broad range of residual gasification products into the groundwater of a coal aquifer. Sorption of many contaminants by the coal itself is an important factor in restricting the migration of these contaminants in the ground water. However, field studies, conducted at Lawrence Livermore National Laboratory's Hoe Creek site, have shown that sorption of organic compounds by coal is not as effective as expected, perhaps because the coal surface area is limited. Furthermore, if severe roof collapse has taken place during gasification, non-coal aquifers located above the gasified coal seam may be interconnected with the coal aquifer, and contaminants may enter these non-coal aquifers, in which sorption is even less effective. The Hoe Creek II and III experiments have provided opportunities to study the contamination of a sand aquifer located above a gasified coal seam in a hydrological recharge area. Preliminary results indicate that the water in the overlying sand aquifer is much less contaminated with organic compounds than the water in the gasified coal aquifer. In conducting these field investigations, valuable lessons ere learned concerning groundwater monitoring. A suggested monitoring strategy is discussed.

  5. Design criteria Drain Rerouting Project 93-OR-EW-2

    SciTech Connect (OSTI)

    Not Available

    1993-04-01T23:59:59.000Z

    This document contains the design criteria to be used by the architect-engineer (A--E) in the performance of Title I and II design for the Drain Rerouting Project. The Drain Rerouting project at the US Department of Energy`s (DOE) Oak Ridge Reservation in Oak Ridge, Tennessee will provide the Y-12 Plant with the capability to reroute particular drains within buildings 9202, 9203 and 9995. Process drains that are presently connected to the storm sewer shall be routed to the sanitary sewer to ensure that any objectionable material inadvertently discharged into process drains will not discharge to East Fork Popular Creek (EFPC) without treatment. The project will also facilitate compliance with the Y-12 Plant`s National Pollutant Discharge Elimination System (NPDES) discharge permit and allow for future pretreatment of once-through coolant.

  6. An Assessment of the Natural and Anthropogenic Geochemistry of the Red Mountain Creek Watershed: Ironton Mining District, Colorado

    E-Print Network [OSTI]

    Litt, Joshua

    2014-04-29T23:59:59.000Z

    Red Mountain Creek is located in the rich mineralized San Juan Mountains of Southwestern Colorado, where mining from the mid 1800s through the late 1970s occurred. Sampling of the Uncompahgre River in the late 1970s, which is downstream of the five...

  7. Biological monitoring of Upper Three Runs Creek, Savannah River Site, Aiken County, South Carolina, March 1990--July 1991

    SciTech Connect (OSTI)

    Not Available

    1991-12-01T23:59:59.000Z

    In anticipation of the fall 1988 start up of effluent discharges into Upper Three Runs Creek by the F/H Area Effluent Treatment Facility of the Savannah River Site, Aiken, SC, a two and one half year biological study was initiated in June 1987. Upper Three Runs Creek is an intensively studied fourth order stream known for its high species richness. Designed to assess the potential impact of F/H area effluent on the creek, the study included qualitative and quantitative macroinvertebrate stream surveys at five sites (see map), chronic toxicity testing of the effluent, water chemistry and bioaccumulation analysis. In a March 1990 study of the potential impact of F/H Area effluent on the macroinvertebrate communities of Upper Three Runs Creek was extended, with reductions in the number of sites to be sampled and in the frequency of water chemistry sampling. This report presents the results of macroinvertebrate stream surveys at three sites, chronic toxicity testing of the effluent and water chemistry analysis of the three stream sites and the effluent from March 1990 to July 1991.

  8. The development of an aquatic spill model for the White Oak Creek watershed, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Johnson, R.O.

    1996-05-01T23:59:59.000Z

    This study develops an aquatic spill model applicable to the White Oak Creek watershed draining the Oak Ridge National Laboratory. Hazardous, toxic, and radioactive chemicals are handled and stored on the laboratory reservation. An accidental spill into the White Oak Creek watershed could contaminate downstream water supplies if insufficient dilution did not occur. White Oak Creek empties into the Clinch River, which flows into the Tennessee River. Both rivers serve as municipal water supplies. The aquatic spill model provides estimates of the dilution at sequential downstream locations along White Oak creek and the Clinch River after an accidental spill of a liquid containing a radioactively decaying constituent. The location of the spill on the laboratory is arbitrary, while hydrologic conditions range from drought to extreme flood are simulated. The aquatic spill model provides quantitative estimates with which to assess water quality downstream from the site of the accidental spill, allowing an informed decision to be made whether to perform mitigating measures so that the integrity of affected water supplies is not jeopardized.

  9. Superfund Record of Decision (EPA Region 8): Anaconda Smelter Site, Mill Creek, Montana (first remedial action), October 1988

    SciTech Connect (OSTI)

    Not Available

    1988-10-02T23:59:59.000Z

    The 160-acre community of Mill Creek is located in Deerlodge County, Montana, immediately adjacent to the Anaconda Smelter NPL site. The community of Mill Creek has been contaminated for over 100 years with smelter emissions, fugitive emissions of flu dust at the smelter, and continued fugitive emissions emanating from adjacent highly contaminated soils. Settled flue emissions in the community of Mill Creek, from the now-defunct copper-smelting operation, contain arsenic, cadmium, and lead. Environmental siting of the community and biological testing of pre-school children, led EPA to conclude that contamination in the Mill Creek area poses an imminent and substantial endangerment to the health of individuals residing there. The primary contaminant of concern at this site is arsenic. Cadmium and lead are secondary contaminants of concern. The selected remedial action for the site includes: permanent relocation of all residents (8 homes) with temporary erosional stabilization of disturbed areas by establishing and maintaining a vegetative cover; demolition, consolidation, and storage.

  10. Grande Ronde Endemic Spring Chinook Project - ODFW, 2008 Annual Report.

    SciTech Connect (OSTI)

    Patterson, Scott

    2009-04-10T23:59:59.000Z

    Core activities of the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCSP) are funded through the authority of the Lower Snake River Fish and Wildlife Compensation Plan (LSRCP). The LSRCP program was approved by the Water Resources Development Act of 1976, PL 94-587, Section 102, 94th Congress substantially in accordance with the Special Report, LSRCP, June 1975 on file with the Chief of Engineers. The LSRCP was prepared and submitted in compliance with the Fish and Wildlife Coordination Act of 1958, PL 85-624, 85th Congress, August 12, 1958 to mitigate for the losses of fish and wildlife caused by the construction of dams on lower Snake River. The GRESCSP is an artificial propagation program that was initiated by Bonneville Power Administrations Fish and Wildlife program in the mid 1990's. The intent of this program was to change the mitigation aspect of the LSRCP program (harvest mitigation) to an integrated supplementation program; inasmuch as, hatchery produced fish could be experimentally used as a recovery tool and fish surplus to mitigation would be available for in-place and in-kind harvest. Fish production is still authorized by the LSRCP with the original mitigation return goal of 5,860 adult spring Chinook to the project area. The GRESCSP was developed with two primary components: (1) conventional broodstock (projects 199800702; 199800703; 199800704) and (2) captive brood (projects 199801001; 199801006). The GRESCSP relies on cooperative M&E efforts from the LSRCP including setting aside the Wenaha and Minam tributaries as natural production reserves components used for reference streams. The GRESCSP, coordinated with federal and tribal partners, identifies production levels for both propagation components and weir management strategies for each of the three supplemented tributary areas within the Grande Ronde Sub-basin. The three supplemented areas are Catherine Creek, Lostine River, and upper Grande Ronde River. Lookingglass Creek, an extirpated area, will be stocked (smolts and adults) with Catherine Creek origin salmon to initiate natural production in unseeded habitat, and to initiate future harvest opportunities. The current production levels have been incorporated into the U.S. v. Oregon Interim Management Agreement. The purpose of this contract is to integrate Bonneville Power Administration (BPA) efforts with the Lower Snake River Compensation Plan (LSRCP) program utilizing Lookingglass Hatchery as the primary rearing facility. BPA constructed an adult holding and spawning structure on the hatchery grounds; however, maintenance of this infrastructure was discontinued due to funding limitation and transferred to the LSRCP program in 2007. These integrated efforts focus on holding and spawning adults, rearing juveniles, fish health, and monitoring natural production (Redd counts) for Catherine Creek, Lostine River, and Upper Grande Ronde stocks.

  11. Kalispell (i.e. Kalispel) Resident Fish Project : Annual Report, 1996.

    SciTech Connect (OSTI)

    Maroney, Joseph; Donley, Christopher; Lockwood, Jr., Neil

    1997-08-01T23:59:59.000Z

    In 1996 the Kalispell Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) continued the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). A habitat and population assessment was conducted on Browns Creek a tributary of Cee Cee Ah Creek, one of the priority tributaries outlined in the 1995 annual report. The assessment was used to determine the type and quality of habitat that was limiting to native bull trout and cutthroat trout populations. Analysis of the habitat data indicated high amounts of sediment in the stream, low bank cover, and a lack of winter habitat. Data collected from this assessment was used to prescribe habitat enhancement measures for Browns Creek. Habitat enhancement measures, as outlined in the recommendations from the 1995 annual report, were conducted during field season 1996. Fencing and planting of riparian areas and in stream structures were implemented. As a precursor to these enhancement efforts, pre-assessments were conducted to determine the affects of the enhancement. Habitat quality, stream morphology and fish populations were pre-assessed. The construction of the largemouth bass hatchery was started in October of 1995. The KNRD, Contractors Northwest Inc. and associated subcontractors are in the process of constructing the hatchery. The projected date of hatchery completion is summer 1997.

  12. White Oak Creek watershed: Melton Valley area Remedial Investigation report, at the Oak Ridge National Laboratory, Oak Ridge, Tennessee: Volume 2, Appendixes A and B

    SciTech Connect (OSTI)

    NONE

    1996-11-01T23:59:59.000Z

    This document contains Appendixes A ``Source Inventory Information for the Subbasins Evaluated for the White Oak Creek Watershed`` and B ``Human Health Risk Assessment for White Oak Creek / Melton Valley Area`` for the remedial investigation report for the White Oak Creek Watershed and Melton Valley Area. Appendix A identifies the waste types and contaminants for each subbasin in addition to the disposal methods. Appendix B identifies potential human health risks and hazards that may result from contaminants present in the different media within Oak Ridge National Laboratory sites.

  13. Natural Propagation and Habitat Improvement, Volume I, Oregon, Supplement A: Habitat Enhancement Evaluation of Fish and Wash Creeks, 1983 Annual Report.

    SciTech Connect (OSTI)

    Everest, Fred

    1984-04-01T23:59:59.000Z

    Habitat improvements for anadromous salmonids on Fish Creek in the upper Clackamas Basin were evaluated. The primary objectives of the evaluation effort include: (1) evaluate and quantify the changes in salmonid spawning and rearing habitat resulting from a variety of habitat improvements; (2) evaluate and quantify the changes in fish populations and biomass resulting from habitat improvements; and (3) evaluate the cost-effectiveness of habitat improvements developed with BPA and KV funds on Fish Creek. This report integrates data for the evaluation efforts collected in the Fish Creek Basin in 1982 and 1983. 3 references, 34 figures, 23 tables.

  14. Twenty-Five Years of Ecological Recovery of East Fork Poplar Creek: Review of Environmental Problems and Remedial Actions

    SciTech Connect (OSTI)

    Smith, John G [ORNL; Loar, James M [ORNL; Stewart, Arthur J [ORNL

    2011-01-01T23:59:59.000Z

    In May 1985, a National Pollutant Discharge Elimination System permit was issued for the Department of Energy s Y-12 National Security Complex (Y-12 Complex) in Oak Ridge, Tennessee, USA, allowing discharge of effluents to East Fork Poplar Creek (EFPC). The effluents ranged from large volumes of chlorinated oncethrough cooling water and cooling tower blow-down to smaller discharges of treated and untreated process wastewaters, which contained a mixture of heavy metals, organics, and nutrients, especially nitrates. As a condition of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed to meet two major objectives: demonstrate that the established effluent limitations were protecting the classified uses of EFPC, and document the ecological effects resulting from implementing a Water Pollution Control Program at the Y-12 Complex. The second objective is the primary focus of the other papers in this special series. This paper provides a history of pollution and the remedial actions that were implemented; describes the geographic setting of the study area; and characterizes the physicochemical attributes of the sampling sites, including changes in stream flow and temperature that occurred during implementation of the BMAP. Most of the actions taken under the Water Pollution Control Program were completed between 1986 and 1998, with as many as four years elapsing between some of the most significant actions. The Water Pollution Control Program included constructing nine new wastewater treatment facilities and implementation of several other pollution-reducing measures, such as a best management practices plan; area-source pollution control management; and various spill-prevention projects. Many of the major actions had readily discernable effects on the chemical and physical conditions of EFPC. As controls on effluents entering the stream were implemented, pollutant concentrations generally declined and, at least initially, the volume of water discharged from the Y-12 Complex declined. This reduction in discharge was of ecological concern and led to implementation of a flow management program for EFPC. Implementing flow management, in turn, led to substantial changes in chemical and physical conditions of the stream: stream discharge nearly doubled and stream temperatures decreased, becoming more similar to those in reference streams. While water quality clearly improved, meeting water quality standards alone does not guarantee protection of a waterbody s biological integrity. Results from studies on the ecological changes stemming from pollution-reduction actions, such as those presented in this series, also are needed to understand how best to restore or protect biological integrity and enhance ecological recovery in stream ecosystems. With a better knowledge of the ecological consequences of their decisions, environmental managers can better evaluate alternative actions and more accurately predict their effects.

  15. Ground-water hydrologic effects resulting from underground coal gasification experiments at the Hoe Creek Site near Gillette, Wyoming. Interim report, October 1979-March 1980

    SciTech Connect (OSTI)

    Raber, E.; Stone, R.

    1980-05-01T23:59:59.000Z

    This technical note summarizes our activities, to date, on the research project: Ground-Water Hydrologic Effects Resulting from Underground Coal Gasification Experiments (EPA-IAG-79-D-X0795). The gasified coal seam (Felix No. 2 coal) and two overlying aquifers (Felix No. 1 coal and overlying sand) appear to have become interconnected as a result of roof collapse and subsidence at both Hoe Creek Sites II and III near Gillette, Wyoming. To evaluate changes in the ground-water flow regime at the two sites, completion of supplementary wells was necessary to define the distance versus head drawdown relationships in each of the three aquifers. Hydraulic head potentials have been measured at Site III since gasification ended on October 10, 1979. These data are presented in graphic format. Although hydraulic head measurements at Site II seemed to be approaching a steady-state condition 1.5 years after gasification, the subsequent gasification at Site III temporarily altered the ground-water flow patterns. These changes will have a definite effect on contaminant dispersal and will need to be taken into consideration.

  16. DOE Underground-Coal-Conversion-Program field-test activities for 1979 and 1980. [Pricetown 1, Hoe Creek 3, Hanna IV, and SDB 1

    SciTech Connect (OSTI)

    Bartke, T.C.

    1983-08-01T23:59:59.000Z

    Under the US Department of Energy's Underground-Coal-Conversion program, four field tests were completed in 1979 and preparations were begun in 1980 for two additional field tests to be operated in 1981. The Laramie Energy Technology Center (LETC) and Sandia National Laboratories (SNL) completed Hanna IV, an air gasification test in Wyoming subbituminous coal. The Morgantown Energy Technology Center (METC) completed Pricetown 1, an air gasification test in West Virginia bituminous coal. Lawrence Livermore National Laboratory (LLNL) completed Hoe Creek 3, a steam-oxygen gasification test in Wyoming subbituminous coal. Gulf Research and Development Co. completed Steeply Dipping Beds (SDB) Test 1, primarily an air gasification test in Wyoming subbituminous coal and the first SDB test in the US. In 1980, Gulf R and D Co. began preparation of SDB Test 2, scheduled for operation in the fall of 1981. The DOE project teams at LETC, METC, LLNL, and SNL, in association with the Washington Irrigation and Development Co. (WIDCo), Washington Water Power (WWP), and the State of Washington, are preparing a field test site in the Centralia-Chehalis coal district of Washington. A series of large coal block tests will be completed prior to the field test, scheduled for operation in 1982 or 1983. This field test will utilize a directionally drilled link and steam-oxygen gasification system. This paper summarizes the results of the four recently completed field tests and the plans for additional tests.

  17. Supplement Analysis for the Watershed Management Program EIS - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence

    SciTech Connect (OSTI)

    N /A

    2004-08-04T23:59:59.000Z

    The Bonneville Power Administration is proposing to fund the installation of approximately 1.5 miles of post and wire fence along Valley Creek in Stanley, Idaho. The proposed fence will meet or exceed BPA's minimum requirement of a 35-foot setback from the stream. Fence posts will be driven into the ground with a post ponder. The goal of this project is to enhance salmon and steelhead rearing and migration habitat through exclusion fencing.

  18. Towards a Stable Future: A Design Proposal for Cerrito Creek in Blake Garden, Kensington, California

    E-Print Network [OSTI]

    Greenberg, Karuna; Pinto, Pedro; Sherraden, Catherine

    2010-01-01T23:59:59.000Z

    Walsh, C. J. et al. Stream restoration in urban catchmentsof a Small Urban Stream Restoration Project in Northernfor an eventual in-stream restoration project (Fig 4). Our

  19. Two-dimensional water quality modeling of Town Creek embayment on Guntersville Reservoir

    SciTech Connect (OSTI)

    Bender, M.D.; Shiao, Ming C.; Hauser, G.E. (Tennessee Valley Authority, Norris, TN (USA). Engineering Lab.); Butkus, S.R. (Tennessee Valley Authority, Norris, TN (USA). Water Quality Dept.)

    1990-09-01T23:59:59.000Z

    TVA investigated water quality of Town Creek embayment using a branched two-dimensional model of Guntersville Reservoir. Simulation results were compared in terms of algal biomass, nutrient concentrations, and volume of embayment with depleted dissolved oxygen. Stratification and flushing play a significant role in the embayment water quality. Storms introduce large loadings of organics, nutrients, and suspended solids. Dissolved oxygen depletion is most severe after storms followed by low flow that fails to flush the embayment. Embayment water quality responses to potential animal waste and erosion controls were explored. Modeling indicated animal waste controls were much more cost-effective than erosion controls. Erosion controls will decrease embayment suspended solids and thereby increase algal biomass due to greater light penetration. 29 refs., 16 figs., 4 tabs.

  20. Risk based optimization of the frequency of EDG on-line maintenance at Hope Creek

    SciTech Connect (OSTI)

    Knoll, A. [Public Service Electric & Gas, Hancocks Bridge, NJ (United States); Samanta, P.K. [Brookhaven National Lab., Upton, NY (United States); Vesely, W.E. [Science Applications International, Dublin, OH (United States)

    1996-09-01T23:59:59.000Z

    This paper presents a study to optimize the frequency of on-line maintenance of the emergency diesel generators at Hope Creek. This study was directed towards identifying, analyzing, and modifying maintenance planning and scheduling practices to assure the high availability of emergency diesel generators. Input from application of a recently developed reliability model, from considerations of probabilistic safety assessment, plant-specific experience, insights from personnel involved in EDG maintenance, and other practical issues were used to define a maintenance schedule that balances its beneficial and adverse impacts. Conclusions resulted in feasible recommendations to optimize and reduce the frequency of diesel on-line maintenance, allowing additional resources to better maintain other equipment important to safety.