Sample records for lolo creek permanent

  1. EA-1895: Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration was preparing this EA to evaluate the potential environmental impacts of replacing an existing seasonal fish weir with a permanent weir, which would have been used to monitor federally-listed Snake River steelhead and collect spring Chinook salmon adults to support ongoing supplementation programs in the watershed. The Bureau of Land Management, a cooperating agency, preliminarily determined Lolo Creek to be suitable for Congressional designation into the Wild and Scenic River System. The EA included a Wild and Scenic River Section 7 analysis. This project was canceled.

  2. EA-1895: Lolo Creek Permanent Weir Construction near town of...

    Broader source: Energy.gov (indexed) [DOE]

    EA to evaluate the potential environmental impacts of replacing an existing seasonal fish weir with a permanent weir, which would be used to monitor federally-listed Snake River...

  3. Camel Creek Minnamoolka

    E-Print Network [OSTI]

    Greenslade, Diana

    Creek Tr ebonne California Ly nd Hellhole Pac ksad dle Little Star River Ella M ic hael Davidson M eunga Echo Mid dle Leich hardt Blund er NobCreek Stony Barron Martin Deception Paddys Creek Broken River

  4. 18 years of restoration on Codornices Creek

    E-Print Network [OSTI]

    Fullmer, Chris

    2008-01-01T23:59:59.000Z

    Friends of Five Creeks Projects."  Friends of Five Creeks.  Friends of Five Creeks.  25 Nov.   2008 Creeks  Council.  Urban Creeks 

  5. Squeezer Creek.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    critical habitat for bull trout and westslope cutthroat trout in a reach of Squeezer Creek in Lake County. Squeezer Creek provides high-quality cold water habitat for native fi...

  6. Thompson Creek, Poway, California THOMPSON CREEK GROUNDWATER SUSTAINABILITY STUDY

    E-Print Network [OSTI]

    Ponce, V. Miguel

    Thompson Creek, Poway, California THOMPSON CREEK GROUNDWATER SUSTAINABILITY STUDY Victor M. Ponce 07 May 2012 #12;EXECUTIVE SUMMARY The groundwater resources of Thompson Creek, in Poway, California. Significantly, a spring in Lower Thompson Creek, documented by USGS in the 1980s, is no longer there. Aquifer

  7. Canasawacta Creek Project: Chenango County, New York

    E-Print Network [OSTI]

    O’Reilly, Mary; MacEwan, David; Greco, Brandon; Nelson, Debra; Long, George; Rowen, John

    2007-01-01T23:59:59.000Z

    Abstract: The Canasawacta Creek Watershed Initiative grewthe inhabitants of the creek valley. Rather than continuefour mile stretch of the creek was performed in early June,

  8. Spooner creek restoration and fish ladder

    E-Print Network [OSTI]

    Moore, Tom

    2003-01-01T23:59:59.000Z

    SPOONER CREEK RESTORATION AND FISH LADDER Tom Moore (Phone:847-3132 Abstract Spooner Creek is a dendritic second orderflows into Cattaraugus Creek, a tributary of Lake Erie.

  9. Biodiversity Corridors in Alamo Creek, Vacaville, California

    E-Print Network [OSTI]

    Urrechaga, Jose; Wei, Xinghan

    2012-01-01T23:59:59.000Z

    Horn, Oct, 2003 4.   Alamo Creek final report, 2005 5.  Biodiversity Corridors in Alamo Creek, Vacaville, Californiabiodiversity corridors along the creek in the city and uses

  10. Daylighting Islais Creek : a feasibility study

    E-Print Network [OSTI]

    Jencks, Rosey; Leonardson, Rebecca

    2004-01-01T23:59:59.000Z

    for daylighting the creek and other green infrastructure.Daylighting Islais Creek for stormwater conveyance wouldGlen Park Cayuga Islais Creek Runoff Elev. Slope coeff.

  11. Camas Creek.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    would connect two separate protect- ed areas owned by the Idaho Department of Fish and Game, creating a contiguous wildlife area of almost 5,000 acres. Camas Creek and...

  12. CRADIT FARM DRIVE CREEK DRIVE

    E-Print Network [OSTI]

    Davis, H. Floyd

    CRADIT FARM DRIVE THURSTON CREEK DRIVE CENTRALAVENUE ENUE UNIVERSITY AVENUE EASTAVENUE FOREST HOME CREEK DRIVE CENTRALAVENUE ENUE UNIVERSITY AVENUE EASTAVENUE FOREST HOME DRIVE HIGHLAND ROBERTS PLACE GARDEN DEANS ARTS QUAD RAWLINGS GREEN R. URIS GARDEN AG QUAD BIOLOGY BEEBE LAK FALL CREEK Clark Hall Olin

  13. Historical narratives of Big Chico Creek Watershed Alliance and Butte Creek Watershed Conservancy

    E-Print Network [OSTI]

    King, Mary Ann; Matz, Mike

    2003-01-01T23:59:59.000Z

    Passage on Upper Butte Creek: An Assessment of the NaturalHistorical Narratives of Big Chico Creek Watershed Allianceand Butte Creek Watershed Conservancy Mary Ann King and Mike

  14. Codornices Creek Corridor: Land Use Regulation, Creek Restoration, and their Impacts on the Residents’ Perceptions

    E-Print Network [OSTI]

    Stokenberga, Aiga; Sen, Arijit

    2013-01-01T23:59:59.000Z

    Restoration on Codornices Creek. Restoration of Rivers andHarper Colophon. Cordonices Creek Corridor Haggerty, L.Associates. 2003. Codornices Creek Watershed Restoration

  15. Along Sausal Creek : an assessment of vegetation, habitat, and morphology of an adopted urban creek

    E-Print Network [OSTI]

    Chanse, Vikki; Herron, Christy

    2003-01-01T23:59:59.000Z

    Lower Reaches of Sausal Creek, Oakland, California." ReportInstitute and Friends of Sausal Creek. Paulsell, Karen.2003. “Sausal Creek Revegetation Project Understory

  16. Manufacturing Battle Creek

    E-Print Network [OSTI]

    de Doncker, Elise

    to the manufacturing sector in Western Michigan. In addition to serving as director of the MRC, Dr. Patten is alsoManufacturing Research Center Kalamazoo Battle Creek The College of Engineering and Applied Sciences The Supporting manufacturing industries by providing opportunities for collaboration with faculty

  17. Hydrology and channel form of an urban creek : Rheem Creek in the context of restoration efforts

    E-Print Network [OSTI]

    Balazs, Carolina; Lang, Micah

    2005-01-01T23:59:59.000Z

    of Reach 3 Hydrology and Channel Form of an Urban Creek:Rheem Creek in the Context of Restoration Efforts CarolinaChannel Form of an Urban Creek: Rheem Creek in the Context

  18. Channel incision in Rodeo Creek, Marin County

    E-Print Network [OSTI]

    Bass, Phoebe; Choy, Min

    2004-01-01T23:59:59.000Z

    on the Wetlands of Rodeo Creek in the Marin Headlands,channel. Cross Section 3 Rodeo Creek is 5 ft wide at Cross1.55 ft deep. Here, Rodeo Creek is a small channel running

  19. Willow Creek - Sept 2009.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Willow Creek land acquisition protects habitat in Willamette Valley The Bonneville Power Administration is working with The Nature Conservancy to acquire and manage a 10-acre...

  20. Road-crossing restoration on alluvial creeks in the Klamath National Forest, California

    E-Print Network [OSTI]

    Lawrence, Justin E

    2008-01-01T23:59:59.000Z

    National Forest of northern California. Upper Elk CreekBishop CreekStanza Creek Upper Boulder Creek Lower Boulder Creek Cecil

  1. Idaho_ColdwaterCreek

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh School footballHydrogenIT | NationalMentoringWind PowerColdwater Creek

  2. The implementation of the Lower Silver Creek watershed project

    E-Print Network [OSTI]

    Keenan, Christina; McPherson, Mariah

    2003-01-01T23:59:59.000Z

    Measures on Lower Silver Creek Interim Project. San Jose,Valley Water District. May 1978. Lower Silver Creek, LakeCunningham, Thompson Creek Planning Survey consisting of

  3. Evolution of a Compound Channel: Tassajara Creek, Dublin, California

    E-Print Network [OSTI]

    Butler, Nathaniel L.; Nolan, Lindsey

    2007-01-01T23:59:59.000Z

    Morphology in the Tassajara Creek Restoration Project Area:Back: Monitoring the Tassajara Creek Restoration Project. UCBed Elevation Tassajara Creek. UC Berkeley Water Resources

  4. Restoration With Reference: Rediscovering Cerrito Creek in Blake Garden

    E-Print Network [OSTI]

    Ludy, Jessica; Podolak, Kristen

    2007-01-01T23:59:59.000Z

    W10301. Figure 1: Historical Map of Cerrito Creek (Friendsof Five Creeks). Figure 2:and watershed contribution to creek reach in Blake garden

  5. Post-project appraisal of Martin Canyon Creek restoration

    E-Print Network [OSTI]

    Wagner, Wayne; Roseman, Jesse

    2006-01-01T23:59:59.000Z

    Ltd. 1999. Martin Canyon Creek Stream Restoration Owner’sAppraisal of Martin Canyon Creek Restoration Final ProjectDublin, California, Martin Canyon Creek is a small tributary

  6. Post Project Appraisal of Cerrito Creek at El Cerrito Plaza

    E-Print Network [OSTI]

    Berndt, Sarah; Smith, Fran

    2005-01-01T23:59:59.000Z

    Project Appraisal of Cerrito Creek at El Cerrito Plaza FINALAppraisal (PPA) of the Cerrito Creek Restoration Project atlighted section of Cerrito Creek (approximately 700 feet in

  7. Post Project Analysis of a Restored Reach of Redwood Creek

    E-Print Network [OSTI]

    Docto, Mia; Corvillon, Daniela Pena

    2012-01-01T23:59:59.000Z

    Inventory  Report  of  Redwood   Creek   Post ProjectAssessment of Redwood Creek Figures Figure 1. Watershed MapFan Conceptual Model Redwood Creek Stream Crossing Removal

  8. Optimal Nonpoint Source Monitoring: An Application to Redwood Creek

    E-Print Network [OSTI]

    Howitt, Richard E

    2000-01-01T23:59:59.000Z

    Application to Redwood Creek By Richard E. Howitt Departmentloading data for Redwood Creek, which flows into and throughcontrol model for Redwood Creek. We simulate the sediment

  9. Archaeological Investigations in Northern San Diego County, California: Frey Creek

    E-Print Network [OSTI]

    True, D. L; Waugh, G.

    1981-01-01T23:59:59.000Z

    and material. FREY CREEK Fig. 14. Artifacts recovered fromCounty, California: Frey Creek D. L. TRUE G. WAUGH S URVEYSand material. FREY CREEK Table 11 ARTIFACT DISTRIBUTION,

  10. Continued monitoring of the Tassajara Creek restoration project 2004

    E-Print Network [OSTI]

    Oden, Matt; DeHollan, Aurel

    2004-01-01T23:59:59.000Z

    Morphology in the Tassajara Creek Restoration Project Area:Back: Monitoring the Tassajara Creek Restoration Project. UCBed Elevation Tassajara Creek. UC Berkeley Water Resources

  11. The removal of Saeltzer Dam on Clear Creek : an update

    E-Print Network [OSTI]

    Ferry, Mike; Miller, Peter

    2003-01-01T23:59:59.000Z

    Fish Passage Project: Clear Creek, Shasta County. Norman S.Management 1996 Lower Clear Creek Watershed Analysis, BureauMatthews &Associates 1999 Clear Creek Rehabilitation Project

  12. Tassajara Creek restoration project: Continued riparian habitat monitoring

    E-Print Network [OSTI]

    Trinh, Michelle; Percelay, Julie

    2008-01-01T23:59:59.000Z

    Consulting. 2001. Tassajara Creek Restoration Project AnnualMorphology in the Tassajara Creek Restoration Project Area:back: Monitoring the Tassajara Creek Restoration Project. UC

  13. Looking forward, looking back : monitoring the Tassajara Creek Restoration Project

    E-Print Network [OSTI]

    Krofta, Chad; Novotney, Michael

    2003-01-01T23:59:59.000Z

    Station Elev. Tassajara Creek Long Profile Compiled SurveyImprovement Plans for Tassajara Creek Restoration. Downs, P.Morphology in the Tassajara Creek Restoration Project Area:

  14. Assessing the Feasibility of Creek Daylighting in San Francisco, Part II: A Preliminary Analysis of Yosemite Creek

    E-Print Network [OSTI]

    Smith, Brooke Ray

    2007-01-01T23:59:59.000Z

    Lucas. 2006. Islais Creek reinterpreted: An exploration ofwould be triggered? If the creek conveys stormwater runoff,2004. Daylighting Islais Creek: a feasibility study.

  15. Case Study: Goose Creek CISD

    E-Print Network [OSTI]

    White, D.

    2014-01-01T23:59:59.000Z

    GOOSE CREEK CISD FINANCIALS • $4,866,124 project • $600k annual savings • 5,954,383 kWh annual savings IMPROVEMENTS • Lighting and water efficiency, computer power management, HVAC, controls redesign case study McKinstry first worked with Goose... Creek CISD performing retro-commissioning through the Centerpoint/Nexant RCx rebate program. McKinstry found additional projects with good returns on investment, warranting a performance contract. Working with the district to apply for the State...

  16. Evidence of Streamflow and Sediment Effects on Juvenile Coho and Benthic Macroinvertebrates of Lagunitas Creek and San Geronimo Creek, Marin County, California

    E-Print Network [OSTI]

    Ball, Joanie; Diver, Sibyl; Hwan, Jason

    2009-01-01T23:59:59.000Z

    at Big Bend Upstream Trib at Big Bend Devil's Gulch CreekDeadman's Creek Left Bank Trib from GroupWildcat & Pioneer Trail Creek Barnabe Creek Smaller Barnabe

  17. Big Bayou Creek and Little Bayou Creek Watershed Monitoring Program

    SciTech Connect (OSTI)

    Kszos, L.A.; Peterson, M.J.; Ryon; Smith, J.G.

    1999-03-01T23:59:59.000Z

    Biological monitoring of Little Bayou and Big Bayou creeks, which border the Paducah Site, has been conducted since 1987. Biological monitoring was conducted by University of Kentucky from 1987 to 1991 and by staff of the Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) from 1991 through March 1999. In March 1998, renewed Kentucky Pollutant Discharge Elimination System (KPDES) permits were issued to the US Department of Energy (DOE) and US Enrichment Corporation. The renewed DOE permit requires that a watershed monitoring program be developed for the Paducah Site within 90 days of the effective date of the renewed permit. This plan outlines the sampling and analysis that will be conducted for the watershed monitoring program. The objectives of the watershed monitoring are to (1) determine whether discharges from the Paducah Site and the Solid Waste Management Units (SWMUs) associated with the Paducah Site are adversely affecting instream fauna, (2) assess the ecological health of Little Bayou and Big Bayou creeks, (3) assess the degree to which abatement actions ecologically benefit Big Bayou Creek and Little Bayou Creek, (4) provide guidance for remediation, (5) provide an evaluation of changes in potential human health concerns, and (6) provide data which could be used to assess the impact of inadvertent spills or fish kill. According to the cleanup will result in these watersheds [Big Bayou and Little Bayou creeks] achieving compliance with the applicable water quality criteria.

  18. Evaluating the Effects of Vortex Rock Weir Stability on Physical Complexity: Penitencia and Wildcat Creeks

    E-Print Network [OSTI]

    Corwin, Emily; Jagt, Katie; Neary, Leigh

    2007-01-01T23:59:59.000Z

    curves for Wildcat Creek. Evaluating the effects of vortexmap of Penitencia Creek………………………………………………………………10 Figure 6.Penitencia Creek site location………………………………………………………………….10

  19. Bacterial Monitoring for the Buck Creek Watershed

    E-Print Network [OSTI]

    The “Bacterial Monitoring for the Buck Creek Watershed” project was developed in response to the creek’s listing on the Texas Water Quality Inventory and 303(d) List due to a bacterial impairment and subsequent total maximum daily load (TMDL...

  20. FIELD EVALUATION OF THE MYRTLE CREEK ADVANCED

    E-Print Network [OSTI]

    Bertini, Robert L.

    FIELD EVALUATION OF THE MYRTLE CREEK ADVANCED CURVE WARNING SYSTEM Final Report SPR 352 #12;#12;FIELD EVALUATION OF THE MYRTLE CREEK ADVANCED CURVE WARNING SYSTEM SPR 352 Final Report by Robert L's Catalog No. 5. Report Date June 2006 4. Title and Subtitle Field Evaluation of the Myrtle Creek Advanced

  1. Restoration Potential of a Mining-Impacted Urban Stream: Horseshoe Branch of Lion Creek, Oakland, CA

    E-Print Network [OSTI]

    Hackenjos, Bethany; Woelfle-Erskine, Cleo; Wood, Jacob

    2010-01-01T23:59:59.000Z

    Level Biotic Index Score, 0= low, 10= high Horseshoe CreekWater Quality in an Urban Creek Watershed, Oakland, CA. AGUHydraulics. 2010. Codornices Creek Gage: Codornices Creek,

  2. Codornices Creek Corridor: Land Use Regulation, Creek Restoration, and their Impacts on the Residents’ Perceptions

    E-Print Network [OSTI]

    Stokenberga, Aiga; Sen, Arijit

    2013-01-01T23:59:59.000Z

    and perception of biodiversity and ecology is their activecommunity and perception of area ecology: individual-levelOutcomes 2 & 3: Perception of Area Ecology & Creek’s Role in

  3. Case Study: Goose Creek CISD 

    E-Print Network [OSTI]

    White, D.

    2014-01-01T23:59:59.000Z

    GOOSE CREEK CISD FINANCIALS • $4,866,124 project • $600k annual savings • 5,954,383 kWh annual savings IMPROVEMENTS • Lighting and water efficiency, computer power management, HVAC, controls redesign case study McKinstry first worked with Goose... • $693,866 project • $87k annual savings • 682,228 kWh annual savings IMPROVEMENTS • HVAC, lighting and water efficiency, computer power management case study Lake Dallas ISD was interested in improving the energy efficiency and aging infrastructure...

  4. Post Project Appraisal of Village Creek Restoration, Albany, CA

    E-Print Network [OSTI]

    Asher, Melissa; Atapattu, Kaumudi

    2005-01-01T23:59:59.000Z

    11/20/05 Schwartz, Susan. Creek mouths along the Bay TrailOakland Museum of California Creek and Watershed InformationSource. “Codornices Creek Watershed”. Guide to San Francisco

  5. Channel response to Dam Removal, Clear Creek, California

    E-Print Network [OSTI]

    Miller, Peter; Vizcaino, Pilar

    2004-01-01T23:59:59.000Z

    to Dam Removal, Clear Creek, California Peter Miller and9, 2004 Abstract Clear Creek drains 720 km 2 , joining the2002) Saeltzer Dam on Clear Creek was a good candidate for

  6. Gully incision in Gerbode Creek, Rodeo Lagoon watershed

    E-Print Network [OSTI]

    Costantino, Raymond L

    2003-01-01T23:59:59.000Z

    and a bridge over Gerbode Creek's main stem. Remnants of thefound on the banks of the creek. North Tributary 1 GerbodeD Distance (ft) GERBODE CREEK: NORTHERN TRIBUTARY 2 Depth (

  7. The Copper Creek Clovis Point from Hells Canyon, Northeastern Oregon

    E-Print Network [OSTI]

    Reid, Kenneth C.; Root, Matthew J.; Hughes, Richard E.

    2008-01-01T23:59:59.000Z

    2008) | pp. 75-84 The Copper Creek Clovis Point from HellsSnake River to the Copper Creek point discovery location.5 cm Figure 4. The Copper Creek Clovis point (tick marks

  8. NAME: Salt Creek Estuary Restoration LOCATION: Salt Creek Watershed, Clallam County, Washington

    E-Print Network [OSTI]

    US Army Corps of Engineers

    NAME: Salt Creek Estuary Restoration LOCATION: Salt Creek Watershed, Clallam County, Washington Federal funds $0 PROJECT DESCRIPTION: The Salt Creek Estuary Reconnection project will significantly enhance tidal and fluvial hydrology to 22.5 acres of salt marsh, which will return the salt marsh to its

  9. Lagrangian Sampling of Wastewater Treatment Plant Effluent in Boulder Creek, Colorado, and Fourmile Creek,

    E-Print Network [OSTI]

    Lagrangian Sampling of Wastewater Treatment Plant Effluent in Boulder Creek, Colorado, and Fourmile of wastewater treatment plant effluent in Boulder Creek, Colorado, and Fourmile Creek, Iowa, during the summer........................................................................................................................................................... 5 Field Measurements, Nutrients, Carbon, Major Ions, Trace Elements, and Biological Components

  10. Kansas Nuclear Profile - Wolf Creek Generating Station

    U.S. Energy Information Administration (EIA) Indexed Site

    April 2012" "Next Release Date: February 2013" "Wolf Creek Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor...

  11. New Jersey Nuclear Profile - Oyster Creek

    U.S. Energy Information Administration (EIA) Indexed Site

    Oyster Creek" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

  12. Microsoft Word - Ninemile_Creek_CX.doc

    Broader source: Energy.gov (indexed) [DOE]

    Tribes of the Colville Reservation for purchase of the Ninemile Creek property Fish and Wildlife Project No.: 2008-104-00, BPA-005670 Categorical Exclusion Applied (from...

  13. Microsoft Word - CoyoteCreekNE_CX

    Broader source: Energy.gov (indexed) [DOE]

    Project Manager - KEWM-4 Proposed Action: Coyote Creek Property Acquisition Funding Fish and Wildlife Project No.: 2011-003-00, Contract BPA-007521 Categorical Exclusion...

  14. Microsoft Word - Coyote Creek CX.docx

    Broader source: Energy.gov (indexed) [DOE]

    of funds to acquire a conservation easement over the 310-acre Coyote Creek property. Fish and Wildlife Project No.: 2011-003-00, Contract BPA-006468 Categorical Exclusion...

  15. Omak Creek acquisition protects endangered salmonid habitat ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to protect habitat for endangered salmon and steelhead along Omak Creek in Okano- gan County. This acquisition would protect spawning, rearing and migratory habitat of...

  16. DOE - Office of Legacy Management -- Hoe Creek Underground Coal...

    Office of Legacy Management (LM)

    Hoe Creek Underground Coal Gasification Site - 045 FUSRAP Considered Sites Site: Hoe Creek Underground Coal Gasification Site (045) Designated Name: Alternate Name: Location:...

  17. Cougar Creek land acquisition Fact Sheet.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of wildlife habitat along Cougar Creek The Bonneville Power Administration proposes to fund the acquisition of wildlife mitigation lands in the Cougar Creek watershed in Shoshone...

  18. Post-project appraisal of Martin Canyon Creek restoration

    E-Print Network [OSTI]

    Wagner, Wayne; Roseman, Jesse

    2006-01-01T23:59:59.000Z

    Martin Canyon Creek Stream Restoration Owner’s Manual: FinalMartin Canyon Creek Stream Restoration in project documents,important component of stream restoration projects to assess

  19. allens creek nuclear: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Materials Science Websites Summary: International Workshop on Interfaces at Bear Creek October 20 - 24, 2009 Bear Creek Mountain Resort of Community and Economic Development...

  20. The Lyons Creek boat remains

    E-Print Network [OSTI]

    Neyland, Robert Stephen

    1990-01-01T23:59:59.000Z

    transportation. Only a few other American colonial-era small craft have as yet been studied, some of which are the Brown's P*y 1 'S*thC1', thEm'Lk Champlain, the Hart's Cove wzeck in New Hampshire, the J R' b t 1 V' g' ', d tl* ~Sk Massachusetts (Albright..., beginning at its mouth, is 9ust over a mile, while the drainage system extends for several miles east of Maryland Route 4. Near the mouth of Lyons Creek, the northern shore is a wetland that is reduced to a grassy mudflat at ebb tide. Only a slender...

  1. Post-project appraisal of year one Re-vegetation performance at the Nathanson Creek Restoration Project, Sonoma County, CA

    E-Print Network [OSTI]

    Blough, Alanna; Brandt, Reuben; Brady, Sarah

    2010-01-01T23:59:59.000Z

    performance at the Nathanson Creek Restoration Project,1. Abstract The Nathanson Creek Parkway and Preserve projectfoot reach of Nathanson Creek, a tributary to Sonoma Creek

  2. Reintroduction of Native FishReintroduction of Native Fish Species to Coal CreekSpecies to Coal Creek

    E-Print Network [OSTI]

    Gray, Matthew

    1 Reintroduction of Native FishReintroduction of Native Fish Species to Coal CreekSpecies to Coal Control and Reclamation ActSurface Mining Control and Reclamation Act of 1977of 1977 Coal Creek Watershed Foundation (2000)Coal Creek Watershed Foundation (2000) BackgroundBackground Fish populations in Coal Creek

  3. Barriers for steelhead (Oncorhynchus mykiss) smolt migration through the lower flood channel of Alameda Creek

    E-Print Network [OSTI]

    Cervantes-Yoshida, Kristina

    2009-01-01T23:59:59.000Z

    of fish die in Alameda Creek. Oakland Tribune, Oakland.trout. Arcata, CA. Miller, J. 2006. Alameda Creek steelheaddocumentation, Alameda Creek Alliance, www.alamedacreek.org.

  4. A post project appraisal of the restoration/rehabilitation of Alamo Creek

    E-Print Network [OSTI]

    Smolko, Darrell

    2003-01-01T23:59:59.000Z

    Associates, Ltd. , Alamo Creek: Conceptual Restoration Plan/Basis of Design Summary Alamo Creek Restoration, Phase 1aRehabilitation of Alamo Creek Darrell Smolko UC Berkeley

  5. Structural characterization of terrestrial microbial Mn oxides from Pinal Creek, AZ

    E-Print Network [OSTI]

    Bargar, John

    2009-01-01T23:59:59.000Z

    Contami- nated Stream, Pinal Creek, Arizona. Masters Thesis,contaminated stream, Pinal Creek, Arizona. Environ. Sci.forming sediment in Pinal Creek, Globe Mining District,

  6. Redesigning Marsh Creek Dam to allow Chinook salmon passage, flood protection, and mercury sedimentation

    E-Print Network [OSTI]

    McNulty, M. Eliza; Wickland, Matthew

    2003-01-01T23:59:59.000Z

    J. E. , 1998. Marsh Creek Watershed Mercury Assessmentbe possible for all of Marsh Creek to be an accessible andD. , unpublished. Marsh Creek mercury assessment and

  7. A Watershed Approach to Urban River Restoration: A Conceptual Restoration Plan for Sausal Creek

    E-Print Network [OSTI]

    Ippolito, Teresa; Podolak, Kristen

    2008-01-01T23:59:59.000Z

    appraisal of the Sausal Creek restoration project, Oakland,Assessment of Sausal Creek: Physical Setting, Habitatmorphology of Sausal Creek, Oakland, California. Water

  8. Post-fire channel changes of Muddy Hollow Creek, Point Reyes National Seashore

    E-Print Network [OSTI]

    Skripnik, Steve; Moshier, Emily

    2004-01-01T23:59:59.000Z

    Changes of Muddy Hollow Creek, Point Reyes National Seashorewatershed of Muddy Hollow Creek was almost entirely burnedchanges to Muddy Hollow Creek and the watershed. They

  9. Hydrologic diversity in Santa Cruz mountain creeks and implications for steelhead population survival

    E-Print Network [OSTI]

    Peterson, Michael

    2012-01-01T23:59:59.000Z

    richardson, in San Gregorio Creek and lagoon, San Mateoalternatives for the Redwood Creek estuary. Redwood NationalWaddell, and Pomponio Creek estuary/lagoon systems, 1985-

  10. Islais Creek reinterpreted: An exploration of restoration designs in the urbanized context of San Francisco

    E-Print Network [OSTI]

    Griffith, Lucas A

    2006-01-01T23:59:59.000Z

    Survey Figure – 1869 Islais Creek Watershed Figure – 1013Soil Map Figure – Islais Creek Watershed (Dot is projectFigures Figure – Islais Creek Historic Profile Figure – 1904

  11. A Decade of Changes in the Wildcat Creek Flood Control Channel, North Richmond

    E-Print Network [OSTI]

    Ginsberg, Ben

    2008-01-01T23:59:59.000Z

    of Changes in the Wildcat Creek Flood Control Channel, NorthAbstract: The lower Wildcat Creek flood control and ripariancontinue. Introduction Wildcat Creek Watershed is located in

  12. Assessing channel morphology following a floodplain restoration project : Wildcat Creek, Richmond, CA

    E-Print Network [OSTI]

    Holt, Ashley; Battaglia, Charles F.

    2004-01-01T23:59:59.000Z

    restore a portion of the Creek without planning for theand White, M. Lower Wildcat Creek flood control project: aProject on Lower Wildcat Creek. UC Berkeley Hydrology

  13. Hydrogeologic Assessment of the East Bear Creek Unit, San Luis National Wildlife Refuge

    E-Print Network [OSTI]

    Quinn, Nigel W.T.

    2007-01-01T23:59:59.000Z

    Addendum to East Bear Creek Design Data Report, Centraltest wells in East Bear Creek Unit ……………. 41 Appendix B :C : East Bear Creek Refuge Water Supply ……………………………………. 64

  14. Post project evaluation, Miller Creek, California : assessment of stream bed morphology, and recommendations for future study

    E-Print Network [OSTI]

    Yin, Wan-chih; Pope-Daum, Caitilin

    2004-01-01T23:59:59.000Z

    1989) Grading Plan, Miller Creek Phases 5 and 6. PreparedValley Units 3-6, Miller Creek Stabilization/Restorationchannel restoration: Miller Creek, Marin County, California.

  15. Development of a Discharge-Stage Rating Curve for Strawberry Creek

    E-Print Network [OSTI]

    Hunt, Lisa

    2011-01-01T23:59:59.000Z

    Curve for Strawberry Creek Lisa Hunt References Charbonneau,R. 1987. Strawberry Creek Management Plan, Office ofand V.H. Resh. 1992. Strawberry Creek on the University of

  16. Towards a Stable Future: A Design Proposal for Cerrito Creek in Blake Garden, Kensington, California

    E-Print Network [OSTI]

    Greenberg, Karuna; Pinto, Pedro; Sherraden, Catherine

    2010-01-01T23:59:59.000Z

    unprotected banks and the creek bed. The rationale behindconnectivity 4. integrate the creek with the garden: a.Rediscovering Cerrito Creek in Blake Garden. eScholarshi,

  17. Post-restoration changes in bed material and channel features, Redwood Creek, Marin County

    E-Print Network [OSTI]

    Matz, Mike; Purcell, Alison

    2004-01-01T23:59:59.000Z

    for salmonid fish in Redwood Creek. References Cited Cherry,of Water: Life in Redwood Creek. Golden Gate National Parksthe Banducci site, Redwood Creek. Prepared for the National

  18. Post project appraisal of Green Valley Creek, Solano County, California : design and management review

    E-Print Network [OSTI]

    Martin, Maureen; Fortin, Alex

    2003-01-01T23:59:59.000Z

    Associates, 1991. Green Valley Creek Restoration Plan. Beck,1996. Green Valley Creek Post-Construction Monitoring 3 Year1998. Green Valley Creek Post-Construction Monitoring 5

  19. Fall-run chinook salmon habitat assessment : lower Marsh Creek, Contra Costa, CA

    E-Print Network [OSTI]

    Levine, Jessie; Stewart, Rosalyn

    2004-01-01T23:59:59.000Z

    mean streamflow data, Marsh Creek near Brentwood CA, Marchmean streamflow data, Marsh Creek near Byron CA, 1952-1983.condition of the Marsh Creek watershed. Natural Heritage

  20. Blackberry Creek Daylighting Project, Berkeley : Ten-Year Post-Project Appraisal

    E-Print Network [OSTI]

    Gerson, Stephanie Karla; Wardani, Jane; Niazi, Shiva

    2005-01-01T23:59:59.000Z

    manager. Personal Communication. December Creek Currents.1994. Blackberry Creek restoration project.Creek Currents. Berkeley, California. Spring/Summer 1994. p.

  1. Cerrito Creek step-pools: An opportunity for restoration and education at Blake Garden

    E-Print Network [OSTI]

    Behrends, Nathaniel

    2008-01-01T23:59:59.000Z

    Assessment of the Alamo Creek Restoration (East Branch).Vincent H. Resh. 1992. Strawberry Creek on the University ofRediscovering Cerrito Creek in Blake Garden. LA227

  2. Distribution of bed sediment on Clear Creek after removal of Saeltzer Dam

    E-Print Network [OSTI]

    Clayton-Niederman, Z; Gilbreath, Alicia

    2005-01-01T23:59:59.000Z

    of Saeltzer Dam on Clear Creek: An Update, Water Resources83-138. Brown, Matt. 2004. Clear Creek anadromous salmonidto Dam Removal, Clear Creek, California, Water Resources

  3. Post project evaluation of Miller Creek (Marin, CA) restoration : vegetation survival

    E-Print Network [OSTI]

    Ting, Jantrue; Pope-Daum, Caitilin

    2004-01-01T23:59:59.000Z

    Valley Units 3-6 Miller Creek Stabilization/RestorationProject Evaluation, Miller Creek, California: Assessment oftoe of bank grade change creek channel water surface LEGEND

  4. A Re-design Proposal: Connecting Whole Foods Market and Codornices Creek

    E-Print Network [OSTI]

    Crampton, Matthew; Martin, John

    2007-01-01T23:59:59.000Z

    of San Pablo Avenue entrance along Codornices Creek corridorNovember 2003. Codornices Creek Watershed Restoration Actiongarage next to Codornices Creek. Monroe Avenue 10th Street

  5. Post-Project Assessment of the 2003 Cerrito Creek Restoration and Recommendations for Additional Stormwater Management

    E-Print Network [OSTI]

    Adlong, Michelle; Cook, Michael; Kennedy, Matthew

    2011-01-01T23:59:59.000Z

    Design. 2011. Cerrito Creek Bay Trail Connector Feasibilitywww.altaplanning.com/cerrito+creek+bay+trail+connector+Baxter and Cerrito Creeks." El Cerrito, CA - Official

  6. Upland groundwater pumping and stream flow, San Jose Creek, Monterey County

    E-Print Network [OSTI]

    Ford, Alexander

    2004-01-01T23:59:59.000Z

    of Field Meeting, Las Garzas Creek Water Rights, Balanceand 23, 1991 San Jose Creek, Williams Canyon, Van Winkleysunnamed tributary to San Jose Creek. Monterey County General

  7. A preliminary assessment of potential steelhead habitat in Sinbad Creek, Alameda County

    E-Print Network [OSTI]

    Herron, Christy; King, Mary Ann; McDonald, Kristen

    2004-01-01T23:59:59.000Z

    Frequency Curve for Alameda Creek 1911-1990. Handout forMichael. 2001. Stonybrook Creek Fish Passage Assessment.trout caught in Sinbad Creek, Sunol, CA. ” credit: Alameda

  8. Panther Creek, Idaho, Habitat Rehabilitation, Final Report.

    SciTech Connect (OSTI)

    Reiser, Dudley W.

    1986-01-01T23:59:59.000Z

    The purpose of the project was to achieve full chinook salmon and steelhead trout production in the Panther Creek, Idaho, basin. Plans were developed to eliminate the sources of toxic effluent entering Panther Creek. Operation of a cobalt-copper mine since the 1930's has resulted in acid, metal-bearing drainage entering the watershed from underground workings and tailings piles. The report discusses plans for eliminating and/or treating the effluent to rehabilitate the water quality of Panther Creek and allow the reestablishment of salmon and trout spawning runs. (ACR)

  9. Permanent Home Number: Residential Number

    E-Print Network [OSTI]

    Viglas, Anastasios

    Permanent Home Number: Residential Number: Mobile: Please update my contact details. Signature nominated correspondence address as indicated below. Permanent Home Adress Residential Address Other Address (Must not be a PO Box) Residential Address (Must not be a PO Box) Other - Postal/Optional Address

  10. Steel Creek fish, L-Lake/Steel Creek Biological Monitoring Program, January 1986--December 1991

    SciTech Connect (OSTI)

    Sayers, R.E. Jr.; Mealing, H.G. III [Normandeau Associates, Inc., New Ellenton, SC (United States)

    1992-04-01T23:59:59.000Z

    The Savannah River Site (SRS) encompasses 300 sq mi of the Atlantic Coastal plain in west-central South Carolina. The Savannah River forms the western boundary of the site. Five major tributaries of the Savannah River -- Upper Three Runs Creek, Four Mile Creek, Pen Branch, Steel Creek, and Lower Three Runs Creek -- drain the site. All but Upper Three Runs Creek receive, or in the past received, thermal effluents from nuclear production reactors. In 1985, L Lake, a 400-hectare cooling reservoir, was built on the upper reaches of Steel Creek to receive effluent from the restart of L-Reactor, and protect the lower reaches from thermal impacts. The lake has an average width of approximately 600 m and extends along the Steel Creek valley approximately 7000 m from the dam to the headwaters. Water level is maintained at a normal pool elevation of 58 m above mean sea level by overflow into a vertical intake tower that has multilevel discharge gates. The intake tower is connected to a horizontal conduit that passes through the dam and releases water into Steel Creek. The Steel Creek Biological Monitoring Program was designed to meet environmental regulatory requirements associated with the restart of L-Reactor and complements the Biological Monitoring Program for L Lake. This extensive program was implemented to address portions of Section 316(a) of the Clean Water Act. The Department of Energy (DOE) must demonstrate that the operation of L-Reactor will not significantly alter the established aquatic ecosystems.

  11. Toms Creek IGCC Demonstration Project

    SciTech Connect (OSTI)

    Virr, M.J.

    1992-01-01T23:59:59.000Z

    The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020[degree]F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

  12. Toms Creek IGCC Demonstration Project

    SciTech Connect (OSTI)

    Virr, M.J.

    1992-11-01T23:59:59.000Z

    The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020{degree}F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

  13. EIS-0346: Salmon Creek Project, WA

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's proposal to fund activities that would restore sufficient water flows to Salmon Creek and rehabilitate its streambed as necessary to provide adequate passage for summer steelhead (Oncorhynchus mykiss) and possibly spring chinook (O. tshawytscha).

  14. SALT CREEK ROADWI-80North STADIUMDRIVE

    E-Print Network [OSTI]

    Powers, Robert

    thSt. 0thSt. 1thSt. 2thSt. 3thSt. 4thSt. . t. 10 SALT CREEK ROADWI-80North 10THSTREET 14THSTREET W STADIUM DRIVE PARKING GARAGE 9thSt. 10thSt. 11thSt. 12thSt. 13thSt. 14thSt. 16thSt. 10thSt. SALT CREEK

  15. Bacterial Monitoring for the Buck Creek Watershed 

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    aquifer drawdown from vegetation and irrigation often reduce stream flow; however, several large pools and stretches of the stream retain water throughout the year, except during extreme drought. Base flow in the stream is typically sustained by small... map of the Buck Creek watershed 7 Major aquifers in Texas (Source: Texas Water Development Board) Groundwater Two aquifers, the Seymour and Blaine, underlie the Buck Creek watershed and supply the bulk of available groundwater. The Seymour...

  16. Hoe Creek groundwater restoration, 1989

    SciTech Connect (OSTI)

    Renk, R.R.; Crader, S.E.; Lindblom, S.R.; Covell, J.R.

    1990-01-01T23:59:59.000Z

    During the summer of 1989, approximately 6.5 million gallons of contaminated groundwater were pumped from 23 wells at the Hoe Creek underground coal gasification site, near Gillette, Wyoming. The organic contaminants were removed using activated carbon before the water was sprayed on 15.4 acres at the sites. Approximately 2647 g (5.8 lb) of phenols and 10,714 g (23.6 lb) of benzene were removed from the site aquifers. Phenols, benzene, toluene, ethylbenzene, and naphthalene concentrations were measured in 43 wells. Benzene is the only contaminant at the site exceeds the federal standard for drinking water (5 {mu}g/L). Benzene leaches into the groundwater and is slow to biologically degrade; therefore, the benzene concentration has remained high in the groundwater at the site. The pumping operation affected groundwater elevations across the entire 80-acre site. The water levels rebounded quickly when the pumping operation was stopped on October 1, 1989. Removing contaminated groundwater by pumping is not an effective way to clean up the site because the continuous release of benzene from coal tars is slow. Benzene will continue to leach of the tars for a long time unless its source is removed or the leaching rate retarded through mitigation techniques. The application of the treated groundwater to the surface stimulated plant growth. No adverse effects were noted or recorded from some 60 soil samples taken from twenty locations in the spray field area. 20 refs., 52 figs., 8 tabs.

  17. Swift Creek Hydroelectric Project rehabilitation, Swift Creek Power Company, Inc

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    The purpose of this report is to re-evaluate and update the original environmental analysis of the Swift Crook Hydroelectric Project rehabilitation. That analysis and the decision to allow the proponent toproceed with the project as described in the EA alternatives 3, 4, and 5 was completed an May 8, 1981. Since that decision, no action has been taken and no special-use permit has ever been issued. The Bridger-Trton National Forest completed a Forest Plan in March of 1990 which sets current direction for all lands within the Forest and new and significant issues pertaining to the amount of water to be bypassed have been raised by the public in response to this proposed project. The original proponent, Lower Valley Power and Light, sold the project and existing facilities to Swift Crack Power Company Inc. in 1984. Swift Crock Power Company has submitted a proposal to rehabilitate the existing power generation facility in Swift Creek Canyon, which will involve some significant construction and alteration of the river corridor. Theyhave also submitted an application for relicense to the Federal Energy Regulatory Commission who has asked for the Forest Service to comment on the application and to submit recommended conditions for approval (4e requirements). The proposed rehabilitation of existing facilities includes replacement of the existing damaged penstock (pipe) with a new, larger one; dredging two existing reservoirs and removal, refurbishment, and reinstallation of the turbines and generators in the two powerhouses with relocation and reconstruction of the lower powerhouse that is located on privately owned land below the Forest boundary.

  18. Lolo Interagency Hotshot Crew Senior Firefighter

    E-Print Network [OSTI]

    Mazzotti, Frank

    fire incidents and when positioning and deploying personnel and equipment, recommends best approaches and practices to use in protection of the values at risk. The Senior Firefighter participates in wildland fire and safety training and in crew proficiency checks and drills, safety sessions, and fire critiques. Position

  19. Final Independent External Peer Review Report Bubbly Creek Ecosystem Restoration

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Final Independent External Peer Review Report Bubbly Creek Ecosystem Restoration Feasibility Study National Planning Center of Expertise for Ecosystem Restoration Mississippi Valley Division Contract No. W Report Bubbly Creek Ecosystem Restoration Feasibility Study Prepared by Battelle 505 King Avenue Columbus

  20. Ichnotaxonomic assessment of Mazon Creek area trace fossils, Illinois, USA

    E-Print Network [OSTI]

    LoBue, David J.

    2010-08-12T23:59:59.000Z

    The Francis Creek Shale Member (FCSM) of the Mid-Pennsylvanian Carbondale Formation along Mazon Creek in northern Illinois is known for soft-bodied organisms preserved within siderite concretions. Trace fossils, though ...

  1. Recommendation 195: Mitigation of Contamination in Bear Creek Burial Grounds

    Broader source: Energy.gov [DOE]

    The ORSSAB requests DOE provide possible remedial actions to mitigate releases of contamination from Bear Creek Burial Grounds.

  2. Steel Creek fish: L-Lake/Steel Creek Biological Monitoring Program, January 1986--December 1987

    SciTech Connect (OSTI)

    Paller, M.H.; Heuer, J.H.; Kissick, L.A.

    1988-03-01T23:59:59.000Z

    Fish samples were collected from Steel Creek during 1986 and 1987 following the impoundment of the headwaters of the stream to form L-Lake, a cooling reservoir for L-Reactor which began operating late in 1985. Electrofishing and ichthyoplankton sample stations were located throughout the creek. Fykenetting sample stations were located in the creek mouth and just above the Steel Creek swamp. Larval fish and fish eggs were collected with 0.5 m plankton nets. Multivariate analysis of the electrofishing data suggested that the fish assemblages in Steel Creek exhibited structural differences associated with proximity to L-Lake, and habitat gradients of current velocity, depth, and canopy cover. The Steel Creek corridor, a lotic reach beginning at the base of the L-Lake embankment was dominated by stream species and bluegill. The delta/swamp, formed where Steel Creek enters the Savannah River floodplain, was dominated by fishes characteristic of slow flowing waters and heavily vegetated habitats. The large channel draining the swamp supported many of the species found in the swamp plus riverine and anadromous forms.

  3. ASSESSMENT OF LIVESTOCK WINTERING AREAS IN BRIDGE CREEK BASIN, 1996

    E-Print Network [OSTI]

    #12;ASSESSMENT OF LIVESTOCK WINTERING AREAS IN BRIDGE CREEK BASIN, 1996 DOE FRAP 1996-03 Prepared-96.............................................. 22 LIST OF FIGURES Figure 1. Bridge Creek basin livestock wintering area back assessment, 1996 quality in the Bridge Creek basin are assessed. These sites had been inspected in the winter and spring

  4. Clear Creek Athletic Complex Marv Kay Stadium at Campbell Field

    E-Print Network [OSTI]

    Clear Creek Athletic Complex Marv Kay Stadium at Campbell Field Mines Athletic Center #12;· Site Creek Athletic Complex Marv Kay Stadium at Campbell Field Mines Athletic Center #12;Mines Master Plan 2010 #12;Clear Creek Athletic Complex Site Plan #12;Site Plan #12;Pedestrian Circulation #12;Vehicular

  5. Bridge Creek Watershed Volunteer Lake Secchi Disk Monitoring Program

    E-Print Network [OSTI]

    #12;Bridge Creek Watershed Volunteer Lake Secchi Disk Monitoring Program 1996 DOE FRAP 1996-13 Ryan Creek Watershed Volunteer Lake Monitoring Program. Using a Secchi disk, volunteers collected water transparency data from 22 lakes in the Bridge Creek watershed. Secchi depth readings were collected between May

  6. State of the Watershed: Water Quality of Boulder Creek, Colorado

    E-Print Network [OSTI]

    State of the Watershed: Water Quality of Boulder Creek, Colorado By Sheila F. Murphy Prepared of the watershed : water quality of Boulder Creek, Colorado / by Sheila Murphy. p. cm. ­(USGS Circular ; 1284) Includes bibliographic references. 1. Water quality -- Colorado -- Boulder Creek Watershed (Boulder

  7. Superfund Record of Decision (EPA Region 8): Anaconda Smelter Site, Mill Creek, Montana (first remedial action), October 1988

    SciTech Connect (OSTI)

    Not Available

    1988-10-02T23:59:59.000Z

    The 160-acre community of Mill Creek is located in Deerlodge County, Montana, immediately adjacent to the Anaconda Smelter NPL site. The community of Mill Creek has been contaminated for over 100 years with smelter emissions, fugitive emissions of flu dust at the smelter, and continued fugitive emissions emanating from adjacent highly contaminated soils. Settled flue emissions in the community of Mill Creek, from the now-defunct copper-smelting operation, contain arsenic, cadmium, and lead. Environmental siting of the community and biological testing of pre-school children, led EPA to conclude that contamination in the Mill Creek area poses an imminent and substantial endangerment to the health of individuals residing there. The primary contaminant of concern at this site is arsenic. Cadmium and lead are secondary contaminants of concern. The selected remedial action for the site includes: permanent relocation of all residents (8 homes) with temporary erosional stabilization of disturbed areas by establishing and maintaining a vegetative cover; demolition, consolidation, and storage.

  8. Unpaving the Way to Creek Restoration in Lower Sausal Creek Watershed: Applying the EU Water Framework Directive to a US Urban Watershed

    E-Print Network [OSTI]

    Li, Hong; Wardani, Jane

    2008-01-01T23:59:59.000Z

    per 10,000 sq ft $0.8 per 10,000 sq ft Creek restoration***Daylighting culverted creeks Open channel Engineered channelbased on cost of Peralta Creek restoration project in lower

  9. Landowners lead successful Buck Creek restoration

    E-Print Network [OSTI]

    Boutwell, Kathryn S.

    2012-01-01T23:59:59.000Z

    of the watershed, according to Dr. John Sij, retired agronomist and former project leader at the Vernon center. ?#31;is e#27;ort veri#25;ed that bacteria levels periodi- cally reach problematic levels,? he said. Landowners lead successful Buck Creek...

  10. Collaborative Monitoring in Walnut Creek, California1

    E-Print Network [OSTI]

    Standiford, Richard B.

    that they gained insight into priorities of Preserve users and knowledge of areas that might require new management regeneration and native grass populations in target management areas in the four Open Space Preserves and had to re-examine some of their own assumptions. The City of Walnut Creek managers stated

  11. Clear Creek, Texas Flood Risk Management Project

    E-Print Network [OSTI]

    US Army Corps of Engineers

    ) of 1996 requires four distinct steps for an evaluation of economic benefits and costs for projects for an evaluation of economic benefits and costs for projects were conducted and displayed in the Economic Appendix ­ Economic Evaluation. The non-Federal projects (FEMA buyout and detention on Marys Creek) augments

  12. Range Creek Calibrated Dates Beta-202190

    E-Print Network [OSTI]

    Provancher, William

    Range Creek Calibrated Dates 0 200 400 600 800 1000 1200 1400 Beta-202190 Beta-175753 Beta-175755 Beta-235067 Beta-202189 Beta-214831 Beta-202188 Beta-202191 Beta-203630 Beta-214832 Beta-175754 Beta a Carbon-14 calibrated date (95% CI) between 1000 and 1200 C.E. (Figure 5: Beta-235067). The calibrated

  13. Buck CreekWatershed Protection Plan

    E-Print Network [OSTI]

    State Soil and Water Conservation Board (Project 06-11) U.S. Environmental Protection Agency Developed Conservation Board (Project 06-11) U.S. Environmental Protection Agency Investigating Agencies: Texas A&M Agri the Texas State Soil and Water Conservation Board and U.S. Environmental Protection Agency. Buck Creek

  14. Carneros Creek: Assessing restoration implications for a sinuous stream using 1-dimensional and 2-dimensional simulation models

    E-Print Network [OSTI]

    Beagle, Julie; Marzion, Rachael; Matella, Mary

    2008-01-01T23:59:59.000Z

    Use History of the Carneros Creek watershed: A component ofplan for the Carneros Creek watershed, Napa County,Lower San Francisquito Creek Watershed Aquatic Habitat

  15. C(re)ek-storation Community Collaboration Site: North Fork of Strawberry Creek by La Loma and Le Conte Avenues

    E-Print Network [OSTI]

    Tannenbaum, Sara Rose

    2011-01-01T23:59:59.000Z

    berkeley_landmarks/theta-xi.html. Urban Creeks Council.2007. Codornices Creek Watershed Restoration Action Plan (336-361. NRPI. Codornices Creek at Ohlone Greenway. Accessed

  16. A long-term post-project evaluation of an urban stream restoration project (Baxter Creek, El Cerrito, California)

    E-Print Network [OSTI]

    Purcell, Alison

    2004-01-01T23:59:59.000Z

    and V. H. Resh. 1992. Strawberry Creek on the University of1995. Biography of an urban creek. Terrain. Berkeley Ecologythe restoration project at Baxter Creek improved habitat and

  17. Mitigation of light rail transit construction on jurisdictional areas in the White Rock Creek floodplain, Dallas, Texas

    E-Print Network [OSTI]

    Schieffer, Emily; Smiley, Jerry

    2001-01-01T23:59:59.000Z

    AREAS IN THE WHITE ROCK CREEK FLOODPLAIN, DALLAS, TEXAS1.2-miles of the White Rock Creek floodplain near theconfluence of three creeks and adjacent to approximately

  18. Effects of a livestock exclosure on channel morphology and vegetation along Long Creek in Lake County, Oregon

    E-Print Network [OSTI]

    Doehring, Carolyn; Rubin, Zan; Sahai, Rashmi

    2011-01-01T23:59:59.000Z

    reaches of Wickiup Creek in Eastern Oregon. Physicalof beaver dams in Bridge Creek, an incised stream channel inavailable data from Long Creek Cross Sections Sites Reach1

  19. Steel Creek primary producers: Periphyton and seston, L-Lake/Steel Creek Biological Monitoring Program, January 1986--December 1991

    SciTech Connect (OSTI)

    Bowers, J.A. [Westinghouse Savannah River Co., Aiken, SC (United States); Toole, M.A.; van Duyn, Y. [Normandeau Associates Inc., New Ellenton, SC (United States)

    1992-02-01T23:59:59.000Z

    The Savannah River Site (SRS) encompasses 300 sq mi of the Atlantic Coastal Plain in west-central South Carolina. Five major tributaries of the Savannah River -- Upper Three Runs Creek, Four Mile Creek, Pen Branch, Steel Creek, and Lower Three Runs Creek -- drain the site. In 1985, L Lake, a 400-hectare cooling reservoir, was built on the upper reaches of Steel Creek to receive effluent from the restart of L-Reactor and to protect the lower reaches from thermal impacts. The Steel Creek Biological Monitoring Program was designed to assess various components of the system and identify and changes due to the operation of L-Reactor or discharge from L Lake. An intensive ecological assessment program prior to the construction of the lake provided baseline data with which to compare data accumulated after the lake was filled and began discharging into the creek. The Department of Energy must demonstrate that the operation of L-Reactor will not significantly alter the established aquatic ecosystems. This report summarizes the results of six years` data from Steel Creek under the L-Lake/Steel Creek Monitoring Program. L Lake is discussed separately from Steel Creek in Volumes NAI-SR-138 through NAI-SR-143.

  20. Geomorphic, vegetation and flooding characteristics for lower San Pablo Creek : a baseline study

    E-Print Network [OSTI]

    Anderson, Shannah; Balazs, Carolina

    2004-01-01T23:59:59.000Z

    of California at Berkeley. Urban Creeks Council.2002.San Pablo Creek at Kennedy Plaza Park Bank Restoration.Upper Alluvial Valley. The creek in this area was incised 25

  1. Hydrogeology and tritium transport in Chicken Creek Canyon, Lawrence Berkeley National Laboratory, Berkeley, California

    E-Print Network [OSTI]

    Jordan, Preston D.; Javandel, Iraj

    2007-01-01T23:59:59.000Z

    exposures in upper Chicken Creek Canyon. Figure 3-2a.Borings and test pits in Chicken Creek Canyon. Figure 3-2b.portion of upper Chicken Creek Canyon. Figure 3-2c. Borings

  2. Post-Project Appraisal of Arroyo Viejo Creek Improvement Project, Oakland, California

    E-Print Network [OSTI]

    Cousins, Mary; Storesund, Rune

    2005-01-01T23:59:59.000Z

    Appraisal of the Arroyo Viejo Creek Restoration Project. 26Cross Sections of Arroyo Viejo Creek at Arroyo Viejo Park (Sowers, J. M. 2000. Creek & Watershed Map of Oakland and

  3. Post-project appraisal of a channel reconstruction on Cuneo Creek, California

    E-Print Network [OSTI]

    Hansen, Aren

    2003-01-01T23:59:59.000Z

    a case study at Bull Creek, Humboldt Redwoods State Park.Rosgen, D. 1991. Bull Creek Watershed Restoration Plan,the South Fork of Cuneo Creek and contributes large amounts

  4. Post-project appraisal of lower Ritchie Creek dam removal, Napa County

    E-Print Network [OSTI]

    Daniels, Jubilee; Pagano, Laura

    2004-01-01T23:59:59.000Z

    Appraisal of Lower Ritchie Creek Dam Removal, Napa CountyApril 2004 Abstract Ritchie Creek drains 2.6 square milesdam was built in 1912 on Ritchie Creek to facilitate water

  5. The influence of large woody debris on channel form, upper Scott Creek, Santa Cruz County

    E-Print Network [OSTI]

    Garcia, Luis; Orduna, Rodrigo

    2004-01-01T23:59:59.000Z

    Introduction The Scott Creek Watershed (Cal Water versionto the Pacific Ocean. Scott Creek hosts runs of Steelhead (O. mykiss) do inhabit the creek. We studied a reach of Scott

  6. Post-Project Appraisal for the Winter Creek Restoration Redwood Grove, UC Botanical Gardens at Berkeley

    E-Print Network [OSTI]

    Fiala, Shannon; Janes, Kelly; Sousa, Ricardo

    2010-01-01T23:59:59.000Z

    in this reach of Winter Creek? 3. How did construction4. Pre-restoration. Winter Creek, looking upstream. 2005.5. Pre-restoration. Winter Creek, looking downstream. 2005.

  7. AN INVESTIGATION OF DEWATERING FOR THE MODIFIED IN-SITU RETORTING PROCESS, PICEANCE CREEK BASIN, COLORADO

    E-Print Network [OSTI]

    Mehran, M.

    2013-01-01T23:59:59.000Z

    J:''-~orraation v Piceance Creek Basin v Colorado r and 9 p'C~b Tract, Piceance Creek Basin, Colorado," Report to Oc~for Piceance and Yellow Creek Watersheds," Environmental

  8. Hydrology of Deer Creek and its tributaries : a contribution to planning a restoration project

    E-Print Network [OSTI]

    Skrtic, Lana

    2005-01-01T23:59:59.000Z

    in text) Table 2: Deer Creek – Chronology of Peak Flows,Return Periods, extrapolated from Oregon Creek data Table 3:Flow Estimates on Deer Creek and its Tributaries Table 4:

  9. Post-Project Appraisal of Crocker Creek Dam Removal Project, Sonoma Co., California

    E-Print Network [OSTI]

    Downing-Kunz, Maureen; Dudley, Colin; Gilbreath, Alicia

    2005-01-01T23:59:59.000Z

    at 1030. CDFG, Crocker Creek (Russian River tributary)on 12/6/05 at CDFG, Crocker Creek (Russian River tributary)Agency (SCWA), “ Crocker Creek Instream Habitat Restoration

  10. Post-project appraisal of the Sausal Creek restoration project, Oakland, California

    E-Print Network [OSTI]

    Eagon, Elizabeth; Largent, Jonathan

    2005-01-01T23:59:59.000Z

    at El Centro Friends of Sausal Creek mobilizing for macro-28: Erosion due to informal creek crossing at rock weirhttp://www.oaklandpw.com/creeks/sausal_complete.htm. Downs,

  11. Baxter Creek Gateway Park: assessment of an urban stream restoration project

    E-Print Network [OSTI]

    Goodman, Judd; Lunde, Kevin B; Zaro, Theresa

    2006-01-01T23:59:59.000Z

    Viani L. 2004. The Baxter Creek Watershed: a cultural andCity of El Cerrito, Friends of Baxter Creek, The WatershedProject, Urban Creeks Council, Restoration Design Group.

  12. Perspectives on Dam Removal: York Creek Dam and the Water Framework Directive

    E-Print Network [OSTI]

    Lawrence, Justin E; Pollak, Josh D; Richmond, Sarah F

    2008-01-01T23:59:59.000Z

    3. Long-profile of York Creek (figure adapted from report byFigure 5. Facies map for York Creek about 100 ft downstreamon Dam Removal: York Creek Dam and the Water Framework

  13. Spatial and temporal ecology of native and introduced fish larvae in Lower Putah Creek, California

    E-Print Network [OSTI]

    Marchetti, Michael P; Moyle, Peter B

    1999-01-01T23:59:59.000Z

    fish in Lower Putah Creek (Yolo Co. CA). Environmentaland non-native taxa totals. Dry Creek drift light PedricRoad drift light Dry Creek drift light Russell drift ligh

  14. White Creek and Nine Canyon wind farms Fact Sheet

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    additional wind storage and shaping services. Since these White Creek and Nine Canyon wind farms December 2006 2 Bonne ville Power Administration DOEBP-3770 November 2006...

  15. AVTA: Clipper Creek AC Level 2 Charging System Testing Results...

    Broader source: Energy.gov (indexed) [DOE]

    electric vehicles. This research was conducted by Idaho National Laboratory. Clipper Creek AC Level 2 - February 2012 More Documents & Publications AVTA: Aerovironment AC Level...

  16. Omak Creek land acquisition Fact Sheet.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    factsheet factsheet Omak Creek acquisition to protect summer steelhead habitat The Bonneville Power Administration is proposing to fund the purchase of two adjacent land parcels to...

  17. Acquisition of Wildlife Habitat in the Calispell Creek Watershed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Calispell Creek watershed in Pend Oreille County, Wash. BPA funds the Albeni Falls Wildlife Mitigation Program, which is tasked with the acquisition and restoration of key...

  18. New Jersey Nuclear Profile - PSEG Hope Creek Generating Station

    U.S. Energy Information Administration (EIA) Indexed Site

    PSEG Hope Creek Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

  19. Microsoft Word - Trimble_Creek_Acquisition_CX.doc

    Broader source: Energy.gov (indexed) [DOE]

    funds to the Kalispel Tribe (Kalispel) for purchase of Trimble Creek (Doramus) Property Fish and Wildlife Project No.: 1992-061-00, Contract BPA-004991 Categorical Exclusion...

  20. Microsoft Word - CX_ThorneCreek_Final.doc

    Broader source: Energy.gov (indexed) [DOE]

    the Confederated Salish and Kootenai Tribes for purchase of the Thorne Creek Property. Fish and Wildlife Project No.: 2002-003-00, Contract CR-201269 Categorical Exclusion Applied...

  1. Microsoft Word - CX_Beaver Creek.doc

    Broader source: Energy.gov (indexed) [DOE]

    (BPA) funding to acquire the Beaver Creek property and to maintain this property for fish and wildlife habitat protection. Budget Information: Work Order 00225478 Fish and...

  2. Mantle Helium And Carbon Isotopes In Separation Creek Geothermal...

    Open Energy Info (EERE)

    Mantle Helium And Carbon Isotopes In Separation Creek Geothermal Springs, Three Sisters Area, Central Oregon- Evidence For Renewed Volcanic Activity Or A Long Term Steady State...

  3. E-Print Network 3.0 - asotin creek fencing Sample Search Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Plants 10 Volunteers removing sandbags Completed project site Summary: Campbell Creek Restoration Anchorage, Alaska Campbell Creek is an anadromous fish stream that flows...

  4. E-Print Network 3.0 - asotin creek instream Sample Search Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Watershed Council Water Quality Monitoring Program Summary: is of interest. To improve in-stream flow restoration effectiveness, implementation of the Whychus Creek... Creek...

  5. Method of making permanent magnets

    DOE Patents [OSTI]

    McCallum, R.W.; Dennis, K.W.; Lograsso, B.K.; Anderson, I.E.

    1993-09-07T23:59:59.000Z

    A method for making an isotropic permanent magnet comprises atomizing a melt of a rare earth-transition metal alloy (e.g., an Nd--Fe--B alloy enriched in Nd and B) under conditions to produce protectively coated, rapidly solidified, generally spherical alloy particles. Wherein a majority of the particles are produced/size classified within a given size fraction (e.g., 5 to 40 microns diameter) exhibiting optimum as-atomized magnetic properties and subjecting the particles to concurrent elevated temperature and elevated isotropic pressure for a time effective to yield a densified, magnetically isotropic magnet compact having enhanced magnetic properties and mechanical properties. 13 figures.

  6. Assessing the Feasibility of Creek Daylighting in San Francisco, Part II: A Preliminary Analysis of Yosemite Creek

    E-Print Network [OSTI]

    Smith, Brooke Ray

    2007-01-01T23:59:59.000Z

    or purchased properties) to daylight the stream? Or is itrestoration (Smith 2007). Why Daylight in San Francisco? Inof San Francisco to daylight Yosemite Creek, how and where

  7. Big Canyon Creek Ecological Restoration Strategy.

    SciTech Connect (OSTI)

    Rasmussen, Lynn; Richardson, Shannon

    2007-10-01T23:59:59.000Z

    He-yey, Nez Perce for steelhead or rainbow trout (Oncorhynchus mykiss), are a culturally and ecologically significant resource within the Big Canyon Creek watershed; they are also part of the federally listed Snake River Basin Steelhead DPS. The majority of the Big Canyon Creek drainage is considered critical habitat for that DPS as well as for the federally listed Snake River fall chinook (Oncorhynchus tshawytscha) ESU. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resources Management-Watershed (Tribe), in an effort to support the continued existence of these and other aquatic species, have developed this document to direct funding toward priority restoration projects in priority areas for the Big Canyon Creek watershed. In order to achieve this, the District and the Tribe: (1) Developed a working group and technical team composed of managers from a variety of stakeholders within the basin; (2) Established geographically distinct sub-watershed areas called Assessment Units (AUs); (3) Created a prioritization framework for the AUs and prioritized them; and (4) Developed treatment strategies to utilize within the prioritized AUs. Assessment Units were delineated by significant shifts in sampled juvenile O. mykiss (steelhead/rainbow trout) densities, which were found to fall at fish passage barriers. The prioritization framework considered four aspects critical to determining the relative importance of performing restoration in a certain area: density of critical fish species, physical condition of the AU, water quantity, and water quality. It was established, through vigorous data analysis within these four areas, that the geographic priority areas for restoration within the Big Canyon Creek watershed are Big Canyon Creek from stream km 45.5 to the headwaters, Little Canyon from km 15 to 30, the mainstem corridors of Big Canyon (mouth to 7km) and Little Canyon (mouth to 7km). The District and the Tribe then used data collected from the District's stream assessment and inventory, utilizing the Stream Visual Assessment Protocol (SVAP), to determine treatment necessary to bring 90% of reaches ranked Poor or Fair through the SVAP up to good or excellent. In 10 year's time, all reaches that were previously evaluated with SVAP will be reevaluated to determine progress and to adapt methods for continued success. Over 400 miles of stream need treatment in order to meet identified restoration goals. Treatments include practices which result in riparian habitat improvements, nutrient reductions, channel condition improvements, fish habitat improvements, invasive species control, water withdrawal reductions, improved hydrologic alterations, upland sediment reductions, and passage barrier removal. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resource Management Watershed Division (Tribe) developed this document to guide restoration activities within the Big Canyon Creek watershed for the period of 2008-2018. This plan was created to demonstrate the ongoing need and potential for anadromous fish habitat restoration within the watershed and to ensure continued implementation of restoration actions and activities. It was developed not only to guide the District and the Tribe, but also to encourage cooperation among all stakeholders, including landowners, government agencies, private organizations, tribal governments, and elected officials. Through sharing information, skills, and resources in an active, cooperative relationships, all concerned parties will have the opportunity to join together to strengthen and maintain a sustainable natural resource base for present and future generations within the watershed. The primary goal of the strategy is to address aquatic habitat restoration needs on a watershed level for resident and anadromous fish species, promoting quality habitat within a self-sustaining watershed. Seven objectives have been developed to support this goal: (1) Identify factors limiting quality

  8. DRAFT ENVIRONMENTAL ASSESSMENT1 PINE CREEK DAM, OKLAHOMA2

    E-Print Network [OSTI]

    US Army Corps of Engineers

    #12;#12;DRAFT ENVIRONMENTAL ASSESSMENT1 PINE CREEK DAM, OKLAHOMA2 DAM SAFETY MODIFICATION3 &4 Environmental Assessment Pine Creek Dam, Oklahoma Dam Safety Modification & Interim Risk Reduction Measure of Federal Regulations, Part 230, the Tulsa District has assessed the environmental impacts of modifications

  9. Permanent Magnet Development for Automotive Traction Motors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Permanent Magnet Development for Automotive Traction Motors Includes: Beyond Rare Earth Magnets (BREM) Iver E. Anderson Ames Laboratory (USDOE) Email: andersoni@ameslab.gov Phone:...

  10. UNDERGRADUATE FELLOWSHIP RECIPIENTS: Stephanie Freeman -Permanent Reactive

    E-Print Network [OSTI]

    Fay, Noah

    55 2003 UNDERGRADUATE FELLOWSHIP RECIPIENTS: Stephanie Freeman - Permanent Reactive Bio Engineering Andrew Hinnell - Improving Electrical Resistivity Tomography for Characterization of Non

  11. Interaction of Ferromagnetic and Superconducting Permanent Magnets...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    permanent magnet track, was put into operation. A vehicle for 2 passengers, equipped with linear drive propulsion, a noncontact energy supply, a second braking system, and various...

  12. Bear Creek Valley Watershed | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureComments fromofBatteries from Brine Batteries fromThermalBe aBear Creek

  13. Forest Creek Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualPropertyd8c-a9ae-f8521cbb8489Information HydroFontana, California:Group JumpHighCreek Wind

  14. Papalote Creek Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcernsCompanyPCN Technology Jump2011) |PanasonicPapalote Creek Wind

  15. Smith Creek Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f < RAPID‎ |RippeyInformation SlimSloughCreek Geothermal Project

  16. Fermilab | Tritium at Fermilab | Kress Creek Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.New Mexico Feb. 13, 2013FocusreceivesTraffic SafetyKress Creek

  17. Cobb Creek Geothermal Facility | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:PowerCER.png El CER esDatasetCityFundCo-benefitsCoalogix IncCobb Creek

  18. NAME: Green Gulch Creek Stream Restoration Project LOCATION: Redwood Creek Watershed in Marin County, CA (closest town is Muir Beach)

    E-Print Network [OSTI]

    US Army Corps of Engineers

    NAME: Green Gulch Creek Stream Restoration Project LOCATION: Redwood Creek Watershed in Marin County, CA (closest town is Muir Beach) ACRES: 1.5 acres riparian habitat; 0.3 miles of stream channel-modified, straightened, and downcut channel; relocate the farm road and fences paralleling the stream to provide

  19. Hoe Creek 1990 quarterly sampling cumulative report

    SciTech Connect (OSTI)

    Crader, S.E.; Huntington, G.S.

    1991-03-01T23:59:59.000Z

    Groundwater samples were collected and analyzed for benzene and for total phenols three times during 1990. This report summarizes the results of these sampling events and compares the results with those obtained in previous years. Possible further options for remediation of the Hoe Creek site was addressed. Three underground coal gasification (UCG) burns were performed by Lawrence Livermore National Laboratory for the US Department of Energy in 1976, 1977, and 1979 at the Hoe Creek site, which is about 20 miles south of Gillette, Wyoming. As a result of these burns, there has been considerable contamination of groundwater by various organic compounds. There have been three efforts at remediating this situation. In 1986 and again in 1987, contaminated water was pumped out, treated, and reinjected. In 1989, the water was pumped, treated, and sprayed into the atmosphere. Benzene and total phenols have been monitored at various monitoring wells as the site during 1990. The highest detected benzene concentration in 1990 was 220 {mu}g/L, and the highest total phenols concentration was 430 {mu}g/L. It is apparent that contamination is still above baseline levels, although the concentration of total phenols is far less than immediately after the burns. The burned coal seams are still releasing organic compounds into the groundwater that passes through them.

  20. Permanent-magnet multipole with adjustable strength

    DOE Patents [OSTI]

    Halbach, K.

    1982-09-20T23:59:59.000Z

    Two or more magnetically soft pole pieces are symmetrically positioned along a longitudinal axis to provide a magnetic field within a space defined by the pole pieces. Two or more permanent magnets are mounted to an external magnetically-soft cylindrical sleeve which rotates to bring the permanent magnets into closer coupling with the pole pieces and thereby adjustably control the field strength of the magnetic field produced in the space defined by the pole pieces. The permanent magnets are preferably formed of rare earth cobalt (REC) material which has a high remanent magnetic field and a strong coercive force. The pole pieces and the permanent magnets have corresponding cylindrical surfaces which are positionable with respect to each other to vary the coupling there between. Auxiliary permanent magnets are provided between the pole pieces to provide additional magnetic flux to the magnetic field without saturating the pole pieces.

  1. Permanent magnet multipole with adjustable strength

    DOE Patents [OSTI]

    Halbach, Klaus (Berkeley, CA)

    1985-01-01T23:59:59.000Z

    Two or more magnetically soft pole pieces are symmetrically positioned along a longitudinal axis to provide a magnetic field within a space defined by the pole pieces. Two or more permanent magnets are mounted to an external magnetically-soft cylindrical sleeve which rotates to bring the permanent magnets into closer coupling with the pole pieces and thereby adjustably control the field strength of the magnetic field produced in the space defined by the pole pieces. The permanent magnets are preferably formed of rare earth cobalt (REC) material which has a high remanent magnetic field and a strong coercive force. The pole pieces and the permanent magnets have corresponding cylindrical surfaces which are positionable with respect to each other to vary the coupling therebetween. Auxiliary permanent magnets are provided between the pole pieces to provide additional magnetic flux to the magnetic field without saturating the pole pieces.

  2. Gating of Permanent Molds for ALuminum Casting

    SciTech Connect (OSTI)

    David Schwam; John F. Wallace; Tom Engle; Qingming Chang

    2004-03-30T23:59:59.000Z

    This report summarizes a two-year project, DE-FC07-01ID13983 that concerns the gating of aluminum castings in permanent molds. The main goal of the project is to improve the quality of aluminum castings produced in permanent molds. The approach taken was determine how the vertical type gating systems used for permanent mold castings can be designed to fill the mold cavity with a minimum of damage to the quality of the resulting casting. It is evident that somewhat different systems are preferred for different shapes and sizes of aluminum castings. The main problems caused by improper gating are entrained aluminum oxide films and entrapped gas. The project highlights the characteristic features of gating systems used in permanent mold aluminum foundries and recommends gating procedures designed to avoid common defects. The study also provides direct evidence on the filling pattern and heat flow behavior in permanent mold castings.

  3. Assessing the Feasibility of Creek Daylighting in San Francisco, Part I: A Synthesis of Lessons Learned from Existing Urban Daylighting Projects

    E-Print Network [OSTI]

    Smith, Brooke Ray

    2007-01-01T23:59:59.000Z

    Factors in Environmental Restoration: Strawberry Creek andBaxter Creek. Water Resource Center Archives, University ofNiazi. 2005. Blackberry Creek Daylighting Project, Berkeley:

  4. A Tidal Hydrology Assessment for Reconnecting Spring Branch Creek to Suisun Marsh, Solano County CA: Predicting the Impact to the Federally Listed Plant Soft Bird's Beak

    E-Print Network [OSTI]

    Olson, Jessica J.

    2011-01-01T23:59:59.000Z

    population in Spring Branch Creek has experienced decline inand up the Spring Branch Creek gradient on its own. Withor up the Spring Branch Creek gradient is necessary. 12

  5. Post-Project Evaluation of Channel Morphology, Invasive Plant Species, and Native Fish Habitat in Putah Creek in Winters, CA Six Years After Channel Relocation

    E-Print Network [OSTI]

    Blackledge, Gina; Boisrame, Gabrielle

    2011-01-01T23:59:59.000Z

    Resources Association 46(2):211-226. Putah Creek Council.2007. Putah Creek Explorer Book. Accessed November 2011. creek- watershed>. StreamWise.

  6. Redwood Creek, Marin County 2010 Monitoring Study of a Salmonid Habitat Stream Restoration Project: Seven-­?Year Post-­?Project Evaluation

    E-Print Network [OSTI]

    Crockett, Richard; Cundy, Fiona; Hanley, Colin

    2010-01-01T23:59:59.000Z

    Trends  in  Lagunitas  and  Redwood  Creek  Mt.  Tamalpais  n.d.   "Lower  Redwood  Creek."   nps.gov.   Golden  Gate  J.  Toby.  "Redwood  Creek  Topographic  Change  Write-­?

  7. Microsoft Word - XX 13 Coyote Creek land acquisition provides...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wildlife Area and the city of Eugene's Coyote Prairie wetland mitigation site, Coyote Creek provides a mix of rare wet prairie and riparian forest. Purchased through a closed-bid...

  8. Alternative Perspectives on the Battle of Wolf Creek of 1938

    E-Print Network [OSTI]

    Warde, Mary Jane

    2001-09-01T23:59:59.000Z

    The Battle of Wolf Creek in northwestern Oklahoma in 1838 was highly significant to the Cheyenne, Arapaho, Kiowa, Comanche, and Plains Apache tribes, but little known beyond their mutual frontier. Their oral accounts of the battle allow us...

  9. TR-019 Hydrology March 2002 Roberts Creek Study Forest

    E-Print Network [OSTI]

    TR-019 Hydrology March 2002 Roberts Creek Study Forest: effects of partial retention harvesting, 250-751-7001 Research Disciplines: Ecology ~ Geology ~ Geomorphology ~ Hydrology ~ Pedology ~ Geomorphology ~ Hydrology ~ Pedology ~ Silviculture ~ Wildlife Abstract

  10. Sediment dynamics of an impounded river: Yegua Creek, Texas

    E-Print Network [OSTI]

    Martinez, Adriana Elizabeth

    2009-05-15T23:59:59.000Z

    Dams have altered flow distributions in rivers everywhere, causing a host of changes in channel morphology and sediment dynamics. Although major changes in flow regime have occurred along Yegua Creek, Texas, since the closure of Somerville Dam...

  11. Microsoft Word - JockoSpringCreek_Scott_Acquisition_CX_Final...

    Broader source: Energy.gov (indexed) [DOE]

    purchase of Jocko Spring Creek Property. Fish and Wildlife Project No.: 2002-003-00, Contract BPA-44646 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):...

  12. Microsoft Word - MissionCreek_Kingston_Acquisition_CX_final.doc

    Broader source: Energy.gov (indexed) [DOE]

    purchase of the Mission Creek Property. Fish and Wildlife Project No.: 2002-003-00, Contract BPA-44646 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25...

  13. Microsoft Word - CX_PistolCreek_Final.doc

    Broader source: Energy.gov (indexed) [DOE]

    the Confederated Salish and Kootenai Tribes for purchase of the Pistol Creek Property. Fish and Wildlife Project No.: 2002-003-00 Categorical Exclusion Applied (from Subpart D, 10...

  14. POLICY GUIDANCE MEMORANDUM #23 Permanent and Nonpermanent Positions...

    Energy Savers [EERE]

    3 Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes POLICY GUIDANCE MEMORANDUM 23 Permanent and Nonpermanent Positions, Appointments, & CHRIS Codes DOE Guidance -...

  15. Geology of the Salt Creek area, Mason County, Texas

    E-Print Network [OSTI]

    Harwood, William Eugene

    1959-01-01T23:59:59.000Z

    USRARy A $ M COLLEQE PP 7DAg GEOIAKY OF THE SALT CREEK ARRA, NASON COUIII'Y, TEXAS A Thesis By WILLI All EOGENE EAR%GOD Subsitted to the Graduate School of the Agricultural asd Nechasical College of Texas is partial iulfillsest... Fornation . ~ . e ~ ~ ~ ~ ~ ~ 19 Hiclrory sandstone nenbsr, Cap Hountain linestone nosher ~. . . 19 Lian Ilountain sandstone nenber . ~ . . ~ . . 19 W libel'ns Forsslt ion . . . ~ ~ ~, ~, ~ Welge sandstone nenbeF . ~ ~ ~ gorgon Creek linestone nsnber...

  16. The geoarchaeology of Buttermilk Creek, Bell County, Texas

    E-Print Network [OSTI]

    Gibson, Brandy Deanne

    1997-01-01T23:59:59.000Z

    THE GEOARCHAEOLOGY OF BUTTERMILK CREEK, BELL COUNTY, TEXAS A Thesis by BRANDY DEANNE GIBSON Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF ARTS... December 1997 Major Subject; Anthropology THE GEOARCHAEOLOGY OF BUTTERMILK CREEK& BELL COUNTY, TEXAS A Thesis by BRANDY DEANNE GIBSON Submitted to Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF ARTS...

  17. An economic evaluation of the Sulphur Creek Watershed Project

    E-Print Network [OSTI]

    Burns, Henry Taylor

    1967-01-01T23:59:59.000Z

    AN ECONOMIC EVALUATION OF THF. SULPHUR CREEK VIATERSHED PROJECT A Thesis by HENRY TAYLOR BURNS Submitted to the Graduate Colleoe of the Texas ARM University in partial fulfillmeni. of the requirements for the degree oi MASTER OF SC ENCE... August 1957 Major Subject: Agricultural Eco, . omics AN ECONOMIC EVALUATION OF THE SULPHUR CREEK 0/ATERSHED ?ROJFCT A Thesis by HENRY TAYLOR BURNS Approveo as to style and content by: /@~me::P~+' . J~'. ~&e. -' Read of Deparrner't, (Meeker j . 8...

  18. Nonuniform radiation damage in permanent magnet quadrupoles

    SciTech Connect (OSTI)

    Danly, C. R.; Merrill, F. E.; Barlow, D.; Mariam, F. G. [Los Alamos National Laboratory, Los Alamos, New Mexico 87544 (United States)

    2014-08-15T23:59:59.000Z

    We present data that indicate nonuniform magnetization loss due to radiation damage in neodymium-iron-boron Halbach-style permanent magnet quadrupoles. The proton radiography (pRad) facility at Los Alamos uses permanent-magnet quadrupoles for magnifying lenses, and a system recently commissioned at GSI-Darmsdadt uses permanent magnets for its primary lenses. Large fluences of spallation neutrons can be produced in close proximity to these magnets when the proton beam is, intentionally or unintentionally, directed into the tungsten beam collimators; imaging experiments at LANL’s pRad have shown image degradation with these magnetic lenses at proton beam doses lower than those expected to cause damage through radiation-induced reduction of the quadrupole strength alone. We have observed preferential degradation in portions of the permanent magnet quadrupole where the field intensity is highest, resulting in increased high-order multipole components.

  19. Permanent magnet edge-field quadrupole

    DOE Patents [OSTI]

    Tatchyn, Roman O. (Mountain View, CA)

    1997-01-01T23:59:59.000Z

    Planar permanent magnet edge-field quadrupoles for use in particle accelerating machines and in insertion devices designed to generate spontaneous or coherent radiation from moving charged particles are disclosed. The invention comprises four magnetized rectangular pieces of permanent magnet material with substantially similar dimensions arranged into two planar arrays situated to generate a field with a substantially dominant quadrupole component in regions close to the device axis.

  20. Types of Student Engagement and Commitment to Stream Stewardship: Strawberry Creek on University of California at Berkeley Campus

    E-Print Network [OSTI]

    Javier, Alexander; Jones, Darryl; Tannenbaum, Sara Rose

    2011-01-01T23:59:59.000Z

    participation in urban creek stewardship. p. 243-248. (Re)R. B. 1987. Strawberry Creek Management Plan, website.V.H. 1992. Strawberry Creek on the University of California,

  1. "Indian Rancherie on Dry Creek": An Early 1850s Indian Village on the Sacramento and San Joaquin County Line

    E-Print Network [OSTI]

    Farris, Glenn

    2008-01-01T23:59:59.000Z

    I "Indian Rancherie on Dry Creek": An Early 185Ds IndianIndian Rancherie on Dry Creek." Cahfomia Pictorial Letterimage of the rancheria on Dry Creek with a commentary relat-

  2. An assessment of stream flow and habitat quality for steelhead trout in San Pablo Creek, Contra Costa County

    E-Print Network [OSTI]

    Anderson, Shannah; Maldague, Lorraine

    2004-01-01T23:59:59.000Z

    conditions in lower hayfork creek. http://www.krisweb.com/Comparison of Peak Flow Values Creek Name Method U s e d ton i n g Equation Wildcat Creek Unit Runoff Index Q2=31.05cfs

  3. The Dry Susie Creek Site: Site Structure of Middle Archaic Habitation Features from the Upper Humboldt River Area, Nevada

    E-Print Network [OSTI]

    Smith, Craig S; Reust, Thomas P

    1995-01-01T23:59:59.000Z

    The Archaeology of James Creek Shelter. University of UtahIn: The Archaeology of James Creek Shelter, Robert G. Elston244-266 (1995). The Dry Susie Creek Site: Site Structure of

  4. Alteration of the groundwater table due to construction of a floodplain bypass at Upper Pine Creek, Concord, California

    E-Print Network [OSTI]

    Williams, John L III

    2003-01-01T23:59:59.000Z

    66 Exploratory Boring 67 Natural Creek 72 Floodplain BypassChannel 78 Floodplain Bypass Channel 65 Natural Creek 69Natural Creek Table 2 Post-Project Groundwater Table Raw

  5. Saeltzer Dam Removal on Clear Creek 11 years later: An assessment of upstream channel changes since the dam's removal

    E-Print Network [OSTI]

    Simons, Crystal; Walker, Katelyn; Zimring, Mark

    2011-01-01T23:59:59.000Z

    pages. Brown, M. (n.d. ). Clear Creek—McCormick-Saeltzer DamBrown, M. (2011). 2011 Clear Creek Technical Team Report froAssessment: Lower Clear Creek Anadromous Fish Restoration &

  6. Changing Obsidian Sources at the Lost Dune and McCoy Creek Sites, Blitzen Valley, Southeast Oregon

    E-Print Network [OSTI]

    Lyons, William H; Thomas, Scott P; Skinner, Craig E

    2001-01-01T23:59:59.000Z

    Dune (35HA792); MC = McCoy Creek (35HA1263) Component ffl;sample. Provenience of McCoy Creek artifacts from Musil (AT THE LOST DUNE AND MCCOY CREEK SITES OREGON NEVADA Burns

  7. Post-Project Appraisal of Baxter Creek at Booker T. Anderson Park : Shopping Carts - The New Boulders

    E-Print Network [OSTI]

    Bronner, Colleen; McKeon, Maggie; Weston, Janel

    2005-01-01T23:59:59.000Z

    water deposition BAXTER CREEK X-SECTION V, NOVEMBER 2005Cross Section VI: BAXTER CREEK X-SECTION VI, JANUARY 2001water deposition BAXTER CREEK X-SECTION VI, NOVEMBER 2005

  8. A Conceptual Restoration Plan and Tidal Hydrology Assessment for Reconnecting Spring Branch Creek to Suisun Marsh, Solano County, California

    E-Print Network [OSTI]

    Olson, Jessica J.

    2012-01-01T23:59:59.000Z

    for Reconnecting Spring Branch Creek to Suisun Marsh, SolanoFramework CHAPTER 2. SPRING BRANCH CREEK SITE ASSESSMENT 2.1Model for Spring Branch Creek Following Reconnection CHAPTER

  9. Post-Project Performance Assessment of a Multi-Phase Urban Stream Restoration Project on Lower Codornices Creek

    E-Print Network [OSTI]

    Docto, Mia; Hoffman, Johanna; Walls, Scott

    2011-01-01T23:59:59.000Z

    1688.1990.tb01380.x. Codornices Creek Restoration, PHASE 11.Vol. 04-108. Urban Creeks Council, Berkeley, CA. 37 pp. + 4Engineering. 2010. Results of Creek Monitoring Codornices

  10. The perfect storm : flow through a restored compound channel : Tassajara Creek, Dublin, CA : assessment of the roughness, flow, floodplain conveyance, and compound channel capacity of the restoration of Tassajara Creek from the high-water marks of a 20-year storm

    E-Print Network [OSTI]

    Chan, Andre; Heard, Sarah K

    2006-01-01T23:59:59.000Z

    Morphology in the Tassajara Creek Restoration Project Area:Compound Channel, Tassajara Creek, Dublin, CA Andre Chan andBack: Monitoring the Tassajara Creek Restoration Project. UC

  11. Ecological effects of contaminants and remedial actions in Bear Creek

    SciTech Connect (OSTI)

    Southworth, G.R.; Loar, J.M.; Ryon, M.G.; Smith, J.G.; Stewart, A.J. (Oak Ridge National Lab., TN (United States)); Burris, J.A. (C. E. Environmental, Inc., Tallahassee, FL (United States))

    1992-01-01T23:59:59.000Z

    Ecological studies of the Bear Creek watershed, which drains the area surrounding several Oak Ridge Y-12 Plant waste disposal facilities, were initiated in May 1984 and are continuing at present. These studies consisted of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek, and they were followed by a presently ongoing monitoring phase that involves reduced sampling intensities. The characterization phase utilized two approaches: (1) instream sampling of benthic invertebrate and fish communities in Bear Creek to identify spatial and temporal patterns in distribution and abundance and (2) laboratory bioassays on water samples from Bear Creek and selected tributaries to identify potential sources of toxicity to biota. The monitoring phase of the ecological program relates to the long-term goals of identifying and prioritizing contaminant sources and assessing the effectiveness of remedial actions. It continues activities of the characterization phase at less frequent intervals. The Bear Greek Valley is a watershed that drains the area surrounding several closed Oak Ridge Y-12 Plant waste disposal facilities. Past waste disposal practices in Bear Creek Valley resulted in contamination of Bear Creek and consequent ecological damage. Extensive remedial actions have been proposed at waste sites, and some of the have been implemented or are now underway. The proposed study plan consists of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek in the first year followed by a reduction in sampling intensity during the monitoring phase of the plan. The results of sampling conducted from May 1984 through early 1989 are presented in this report.

  12. Cylindrical Hall Thrusters with Permanent Magnets

    SciTech Connect (OSTI)

    Raitses, Yevgeny; Merino, Enrique; Fisch, Nathaniel J.

    2010-10-18T23:59:59.000Z

    The use of permanent magnets instead of electromagnet coils for low power Hall thrusters can offer a significant reduction of both the total electric power consumption and the thruster mass. Two permanent magnet versions of the miniaturized cylindrical Hall thruster (CHT) of different overall dimensions were operated in the power range of 50W-300 W. The discharge and plasma plume measurements revealed that the CHT thrusters with permanent magnets and electromagnet coils operate rather differently. In particular, the angular ion current density distribution from the permanent magnet thrusters has an unusual halo shape, with a majority of high energy ions flowing at large angles with respect to the thruster centerline. Differences in the magnetic field topology outside the thruster channel and in the vicinity of the channel exit are likely responsible for the differences in the plume characteristics measured for the CHTs with electromagnets and permanent magnets. It is shown that the presence of the reversing-direction or cusp-type magnetic field configuration inside the thruster channel without a strong axial magnetic field outside the thruster channel does not lead to the halo plasma plume from the CHT. __________________________________________________

  13. The feasibility of residential development in the newly master planned Ship Creek area of Anchorage, Alaska

    E-Print Network [OSTI]

    Debenham, Shaun T. (Shaun Todd), 1973-

    2004-01-01T23:59:59.000Z

    The aim of this thesis is to determine if a 40 unit condominium complex located in the Ship Creek area in Anchorage, Alaska, is financially feasible. Historically, Ship Creek has been an industrial area but recently the ...

  14. Rainwater in the Urban Landscape: The Garrison Creek Demonstration Project [Infrastructure as Landscape, Landscape as Infrastructure

    E-Print Network [OSTI]

    Brown, James; Storey, Kim

    1996-01-01T23:59:59.000Z

    ^7 ' g s PLACES BROWN AND ST O RE Y : G A RR I SO N CREEKspace. Toronto's Garrison Creek is a typical example of theits landscape. Today the creek flows through an elaborate,

  15. EA-1219: Hoe Creek Underground Coal Gasification Test Site Remediation, Campbell County, Wyoming

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposed Hoe Creek Underground Coal Gasification Test Site Remediation that would be performed at the Hoe Creek site in Campbell County, Wyoming.

  16. Scotch Creek Wildlife Area 2007-2008 Annual Report.

    SciTech Connect (OSTI)

    Olson, Jim [Washington Department of Fish and Wildlife

    2008-11-03T23:59:59.000Z

    The Scotch Creek Wildlife Area is a complex of 6 separate management units located in Okanogan County in North-central Washington State. The project is located within the Columbia Cascade Province (Okanogan sub-basin) and partially addresses adverse impacts caused by the construction of Chief Joseph and Grand Coulee hydroelectric dams. With the acquisition of the Eder unit in 2007, the total size of the wildlife area is now 19,860 acres. The Scotch Creek Wildlife Area was approved as a wildlife mitigation project in 1996 and habitat enhancement efforts to meet mitigation objectives have been underway since the spring of 1997 on Scotch Creek. Continuing efforts to monitor the threatened Sharp-tailed grouse population on the Scotch Creek unit are encouraging. The past two spring seasons were unseasonably cold and wet, a dangerous time for the young of the year. This past spring, Scotch Creek had a cold snap with snow on June 10th, a critical period for young chicks just hatched. Still, adult numbers on the leks have remained stable the past two years. Maintenance of BPA funded enhancements is necessary to protect and enhance shrub-steppe and to recover and sustain populations of Sharp-tailed grouse and other obligate species.

  17. Recurrent faulting and petroleum accumulation, Cat Creek Anticline, central Montana

    SciTech Connect (OSTI)

    Nelson, W.J. (Illinois State Geological Survey, Champaign (United States))

    1991-06-01T23:59:59.000Z

    The Cat Creek anticline, scene of central Montana's first significant oil discovery, is underlain by a south-dipping high-angle fault (Cat Creek fault) that has undergone several episodes of movement with opposite sense of displacement. Borehole data suggest that the Cat Creek fault originated as a normal fault during Proterozoic rifting concurrent with deposition of the Belt Supergroup. Reverse faulting took place in Late Cambrian time, and again near the end of the Devonian Period. The Devonian episode, coeval with the Antler orogeny, raised the southern block several hundred feet. The southern block remained high through Meramecian time, then began to subside. Post-Atokan, pre-Middle Jurassic normal faulting lowered the southern block as much as 1,500 ft. During the Laramide orogeny (latest Cretaceous-Eocene) the Cat Creek fault underwent as much as 4,000 ft of reverse displacement and a comparable amount of left-lateral displacement. The Cat Creek anticline is a fault-propagation fold; en echelon domes and listric normal faults developed along its crest in response to wrenching. Oil was generated mainly in organic-rich shales of the Heath Formation (upper Chesterian Series) and migrated upward along tectonic fractures into Pennsylvanian, Jurassic, and Cretaceous reservoir rocks in structural traps in en echelon domes. Production has been achieved only from those domes where structural closure was retained from Jurassic through Holocene time.

  18. Laced permanent magnet quadrupole drift tube magnets

    SciTech Connect (OSTI)

    Feinberg, B.; Behrsing, G.U.; Halbach, K.; Marks, J.S.; Morrison, M.E.; Nelson, D.H.

    1989-03-01T23:59:59.000Z

    Twenty-three laced permanent magnet quadrupole drift tube magnets have been constructed, tested, and installed in the SuperHILAC heavy ion linear accelerator at LBL, marking the first accelerator use of this new type of quadrupole. The magnets consist of conventional tape-wound quadrupole electromagnets, using iron pole-pieces, with permanent magnet material (samarium cobalt) inserted between the poles to reduce the effects of saturation. The iron is preloaded with magnetic flux generated by the permanent magnet material, resulting in an asymmetrical saturation curve. Since the polarity of the individual quadrupole magnets in a drift tube linac is never reversed, we can take advantage of this asymmetrical saturation to provide about 20% greater focusing strength than is available with conventional quadrupoles, while replacing the vanadium permendur poletips with iron poletips. Comparisons between these magnets and conventional tape-wound quadrupoles will be presented. 3 refs., 5 figs.

  19. Analysis of geothermal electric-power generation at Big Creek Hot Springs, Lemhi County, Idaho

    SciTech Connect (OSTI)

    Struhsacker, D.W. (ed.)

    1981-01-01T23:59:59.000Z

    Big Creek Hot Springs was evaluated as a source of electrical power for the Blackbird Cobalt Mine, approximately 13 miles south of the hot spring. An evaluaton of the geothermal potential of Big Creek Hot Springs, a suggested exploration program and budget, an engineering feasibility study of power generation at Big Creek Hot Springs, an economic analysis of the modeled power generating system, and an appraisal of the institutional factors influencing development at Big Creek Hot Springs are included.

  20. Perspectives on Dam Removal: York Creek Dam and the Water Framework Directive

    E-Print Network [OSTI]

    Lawrence, Justin E; Pollak, Josh D; Richmond, Sarah F

    2008-01-01T23:59:59.000Z

    Environmental Impact Report, Upper York Creek Ecosystem Restoration Project on April 8, 2008 to learn more about the history

  1. Inorganic water chemistry 71 Chapter 4 -Inorganic Water Chemistry of the Boulder Creek

    E-Print Network [OSTI]

    Inorganic water chemistry 71 Chapter 4 - Inorganic Water Chemistry of the Boulder Creek Watershed Creek Watershed, Colorado were determined on a suite of water samples collected during high and low flow sixteen stream sites, twelve tributaries/inflows, and Saint Vrain Creek. The most upstream site was above

  2. CHEMICAL AND HYDROLOGIC DATA FROM THE CEMENT CREEK AND UPPER ANIMAS RIVER CONFLUENCE AND

    E-Print Network [OSTI]

    CHEMICAL AND HYDROLOGIC DATA FROM THE CEMENT CREEK AND UPPER ANIMAS RIVER CONFLUENCE AND MIXING.S. Geological Survey #12;CHEMICAL AND HYDROLOGIC DATA FROM THE CEMENT CREEK AND UPPER ANIMAS RIVER CONFLUENCE.H., Schemel, L.E., 2007, Chemical and hydrologic data form the Cement Creek and upper Animas River confluence

  3. Roberts Creek Study Forest: the effects of shelterwood harvesting and blowdown

    E-Print Network [OSTI]

    is sediment produc- tion in domestic water supply creeks. The effects of timber harvesting on sedimentRoberts Creek Study Forest: the effects of shelterwood harvesting and blowdown on sediment production in a small zero-order creek by Robert O. Hudson and Brian D'Anjou KEYWORDS: Shelterwood harvest

  4. Fast-growing willow shrub named `Fish Creek`

    SciTech Connect (OSTI)

    Abrahamson, Lawrence P.; Kopp, Richard F.; Smart, Lawrence B.; Volk, Timothy A.

    2007-05-08T23:59:59.000Z

    A distinct male cultivar of Salix purpurea named `Fish Creek`, characterized by rapid stem growth producing greater than 30% more woody biomass than either of its parents (`94001` and `94006`) and 20% more biomass than a current production cultivar (`SV1`). `Fish Creek` can be planted from dormant stem cuttings, produces multiple stems after coppice, and the stem biomass can be harvested when the plant is dormant. In the spring following harvest, the plant will re-sprout very vigorously, producing new stems that can be harvested after two to four years of growth. This harvest cycle can be repeated several times. The stem biomass can be chipped and burned as a source of renewable energy, generating heat and/or electricity. `Fish Creek` displays a low incidence of rust disease or damage by beetles or sawflies.

  5. Fast-growing willow shrub named `Fish Creek`

    DOE Patents [OSTI]

    Abrahamson, Lawrence P.; Kopp, Richard F.; Smart, Lawrence B.; Volk, Timothy A.

    2007-05-08T23:59:59.000Z

    A distinct male cultivar of Salix purpurea named `Fish Creek`, characterized by rapid stem growth producing greater than 30% more woody biomass than either of its parents (`94001` and `94006`) and 20% more biomass than a current production cultivar (`SV1`). `Fish Creek` can be planted from dormant stem cuttings, produces multiple stems after coppice, and the stem biomass can be harvested when the plant is dormant. In the spring following harvest, the plant will re-sprout very vigorously, producing new stems that can be harvested after two to four years of growth. This harvest cycle can be repeated several times. The stem biomass can be chipped and burned as a source of renewable energy, generating heat and/or electricity. `Fish Creek` displays a low incidence of rust disease or damage by beetles or sawflies.

  6. Identification and characterization of wetlands in the Bear Creek watershed

    SciTech Connect (OSTI)

    Rosensteel, B.A. [JAYCOR, Oak Ridge, TN (United States); Trettin, C.C. [Oak Ridge National Lab., TN (United States)

    1993-10-01T23:59:59.000Z

    The primary objective of this study was to identify, characterize, and map the wetlands in the Bear Creek watershed. A preliminary wetland categorization system based on the Cowardin classification system (Cowardin et al. 1979) with additional site-specific topographic, vegetation, and disturbance characteristic modifiers was developed to characterize the type of wetlands that exist in the Bear Creek watershed. An additional objective was to detect possible relationships among site soils, hydrology, and the occurrence of wetlands in the watershed through a comparison of existing data with the field survey. Research needs are discussed in the context of wetland functions and values and regulatory requirements for wetland impact assessment and compensatory mitigation.

  7. Laced permanent magnet quadrupole drift tube magnets

    SciTech Connect (OSTI)

    Feinberg, B.; Behrsing, G.U.; Halbach, K.; Marks, J.S.; Morrison, M.E.; Nelson, D.H.

    1988-10-01T23:59:59.000Z

    A laced permanent magnet quadrupole drift tube magnet has been constructed for a proof-of-principle test. The magnet is a conventional tape-wound quadrupole electromagnet, using iron pole- pieces, with the addition of permanent magnet material (neodymium iron) between the poles to reduce the effects of saturation. The iron is preloaded with magnetic flux generated by the permanent magnet material, resulting in an asymmetrical saturation curve. Since the polarity of the quadrupole magnets in a drift tube linac is not reversed we can take advantage of this asymmetrical saturation to provide greater focusing strength. The magnet configuration has been optimized and the vanadium permendur poles needed in a conventional quadrupole have been replaced with iron poles. The use of permanent magnet material has allowed us to increase the focusing strength of the magnet by about 20% over that of a conventional tape-wound quadrupole. Comparisons will be made between this magnet and the conventional tape-wound quadrupole. 3 refs., 5 figs.

  8. Dovetail spoke internal permanent magnet machine

    DOE Patents [OSTI]

    Alexander, James Pellegrino (Ballston Lake, NY); EL-Refaie, Ayman Mohamed Fawzi (Niskayuna, NY); Lokhandwalla, Murtuza (Clifton Park, NY); Shah, Manoj Ramprasad (Latham, NY); VanDam, Jeremy Daniel (West Coxsackie, NY)

    2011-08-23T23:59:59.000Z

    An internal permanent magnet (IPM) machine is provided. The IPM machine includes a stator assembly and a stator core. The stator core also includes multiple stator teeth. The stator assembly is further configured with stator windings to generate a stator magnetic field when excited with alternating currents and extends along a longitudinal axis with an inner surface defining a cavity. The IPM machine also includes a rotor assembly and a rotor core. The rotor core is disposed inside the cavity and configured to rotate about the longitudinal axis. The rotor assembly further includes a shaft. The shaft further includes multiple protrusions alternately arranged relative to multiple bottom structures provided on the shaft. The rotor assembly also includes multiple stacks of laminations disposed on the protrusions and dovetailed circumferentially around the shaft. The rotor assembly further includes multiple pair of permanent magnets for generating a magnetic field, which magnetic field interacts with the stator magnetic field to produce a torque. The multiple pair of permanent magnets are disposed between the stacks. The rotor assembly also includes multiple middle wedges mounted between each pair of the multiple permanent magnets.

  9. Performance improvement of permanent magnet ac motors

    E-Print Network [OSTI]

    Parsa, Leila

    2005-08-29T23:59:59.000Z

    .????????????????....????.. 19 B. Background............??..?????.??.?????...?.?.... 20 C. Comparing BLDC Motor and PMSM???????????... 24 D. Harmonic Spectrum of MMF in Machines with Non-sinusoidal Winding Distribution??????????????????.. 26 ix TABLE............................................................................ 58 H. Conclusion??????????????????????. 68 III FAULT TOLERANT OPERATION OF PERMANENT MAGNET MOTOR DRIVES?????????????????????? 69 A. Introduction.????????????????....???.?. 69 B. Fault Tolerant Operation of Five-Phase PMSM...

  10. Removal of a Permanent IVC Filter

    SciTech Connect (OSTI)

    Kumar, Bangalore C. Anil [Queen's Medical Centre, Department of Radiology (United Kingdom)], E-mail: anil.kumar@doctors.org.uk; Chakraverty, Sam; Zealley, Ian [Ninewells Hospital, Department of Radiology (United Kingdom)

    2006-02-15T23:59:59.000Z

    Inferior vena cava (IVC) filters are increasingly used for prevention of life-threatening pulmonary emboli in patients who have contraindications to anticoagulation therapy. We report a case of the removal of a permanent IVC filter, which was inadvertently inserted due to an incorrect ultrasound report.

  11. EIS-0415: Deer Creek Station Energy Facility Project, South Dakota

    Broader source: Energy.gov [DOE]

    This EIS analyzes WAPA's decision to approve the interconnection request made by Basin Electric Power Cooperative (Basin Electric) with the USDA Rural Utilities Service (RUS) proposing to provide financial assistance, for the Deer Creek Station Project, a proposed 300-megawatt (MW) natural gas-fired generation facility.

  12. Tillman Creek Mitigation Site As-Build Report.

    SciTech Connect (OSTI)

    Gresham, Doug [Otak, Inc.

    2009-05-29T23:59:59.000Z

    This as-built report describes site conditions at the Tillman Creek mitigation site in South Cle Elum, Washington. This mitigation site was constructed in 2006-2007 to compensate for wetland impacts from the Yakama Nation hatchery. This as-built report provides information on the construction sequence, as-built survey, and establishment of baseline monitoring stations.

  13. Ventilation planning at Energy West's Deer Creek mine

    SciTech Connect (OSTI)

    Tonc, L.; Prosser, B.; Gamble, G. [Pacific Corp., Huntington, UT (United States)

    2009-08-15T23:59:59.000Z

    In 2004 ventilation planning was initiated to exploit a remote area of Deer Creek mine's reserve (near Huntington, Utah), the Mill Fork Area, located under a mountain. A push-pull ventilation system was selected. This article details the design process of the ventilation system upgrade, the procurement process for the new fans, and the new fan startup testing. 5 figs., 1 photo.

  14. sanfranciscoestuaryinstitute//finalreport Coyote Creek/Coyote Valley

    E-Print Network [OSTI]

    Laguna Seca Coyote Creek Fisher Cr. #12;III - 49 sanfranciscoestuaryinstitute//finalreport Map 4B-ca.1800, green; project boundary, white (scale 1:40,000; 1"~3300'; 1 square inch ~250 acres; original photographs, with historicaL Landscape features overLay. Historical fluvial features in blue; other features, green; project

  15. Okanogan Focus Watershed Salmon Creek : Annual Report 1999.

    SciTech Connect (OSTI)

    Lyman, Hilary

    1999-11-01T23:59:59.000Z

    During FY 1999 the Colville Tribes and the Okanogan Irrigation District (OID) agreed to study the feasibility of restoring and enhancing anadromous fish populations in Salmon Creek while maintaining the ability of the district to continue full water service delivery to it members.

  16. Optimal Current Waveforms for Brushless Permanent Magnet Motors

    E-Print Network [OSTI]

    ;1 Introduction We consider the problem of controlling an AC permanent magnet synchronous motor (PMSM) by choosing

  17. Permanent-magnet switched-flux machine

    DOE Patents [OSTI]

    Trzynadlowski, Andrzej M.; Qin, Ling

    2010-01-12T23:59:59.000Z

    A permanent-magnet switched-flux (PMSF) device has a ferromagnetic outer stator mounted to a shaft about a central axis extending axially through the PMSF device. Pluralities of top and bottom stator poles are respectively mounted in first and second circles, radially outwardly in first and second transverse planes extending from first and second sections of the central axis adjacent to an inner surface of the ferromagnetic outer stator. A ferromagnetic inner rotor is coupled to the shaft and has i) a rotor core having a core axis co-axial with the central axis; and ii) first and second discs having respective outer edges with first and second pluralities of permanent magnets (PMs) mounted in first and second circles, radially outwardly from the rotor core axis in the first and second transverse planes. The first and second pluralities of PMs each include PMs of alternating polarity.

  18. Permanent magnet design for high-speed superconducting bearings

    DOE Patents [OSTI]

    Hull, J.R.; Uherka, K.L.; Abdoud, R.G.

    1996-09-10T23:59:59.000Z

    A high temperature superconducting bearing including a permanent magnet rotor levitated by a high temperature superconducting structure is disclosed. The rotor preferably includes one or more concentric permanent magnet rings coupled to permanent magnet ring structures having substantially triangular and quadrangular cross-sections. Both alternating and single direction polarity magnet structures can be used in the bearing. 9 figs.

  19. Permanent magnet design for high-speed superconducting bearings

    DOE Patents [OSTI]

    Hull, John R. (5519 S. Bruner, Hinsdale, IL 60521); Uherka, Kenneth L. (830 Ironwood, Frankfort, IL 60423); Abdoud, Robert G. (13 Country Oaks La., Barrington Hills, IL 60010)

    1996-01-01T23:59:59.000Z

    A high temperature superconducting bearing including a permanent magnet rotor levitated by a high temperature superconducting structure. The rotor preferably includes one or more concentric permanent magnet rings coupled to permanent magnet ring structures having substantially triangular and quadrangular cross-sections. Both alternating and single direction polarity magnet structures can be used in the bearing.

  20. When Do Commercial Reactors Permanently Shut Down?

    Reports and Publications (EIA)

    2011-01-01T23:59:59.000Z

    For those wishing to obtain current data, the following resources are available: U.S. reactors, go to the Energy Information Administration's nuclear reactor shutdown list. (Note: As of April 30, 2010, the last U.S. reactor to permanently shut down was Big Rock Point in 1997.) Foreign Reactors, go to the Power Reactor Information System (PRIS) on the International Atomic Energy Agency's website.

  1. Lolo Hot Springs Resort Space Heating Low Temperature Geothermal Facility |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:Landowners andLodgepole, Nebraska: Energy ResourcesNebraska:WestOpen

  2. EA-1978: Sand Creek Winds, McCone County, Montana

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) is preparing an EA to analyze the potential environmental impacts of the proposed Sand Creek Winds Project, a 75-MW wind farm between the towns of Circle and Wolf Point in McCone County, Montana. The proposed wind farm would interconnect to Western’s existing Wolf Point to Circle 115-kV transmission line approximately 18 miles north of Wolf Point.

  3. Early cavity growth during forward burn. [Hoe Creek III problems

    SciTech Connect (OSTI)

    Shannon, M.J.; Thorsness, C.B.; Hill, R.W.

    1980-07-03T23:59:59.000Z

    During the early portion of the forward burn phase of the Hoe Creek III field experiment, the cavity progagated rapidly down the deviated borehole and to the top of the coal seam. As a first step to understanding this phenomena we have conducted small scale coal block experiments. Drying as well as combustion tests were performed. This paper describes the test hardware and the experimental results.

  4. High Temperature, Permanent Magnet Biased Magnetic Bearings

    E-Print Network [OSTI]

    Gandhi, Varun R.

    2010-07-14T23:59:59.000Z

    , then the molding process was carried out to form the potting cement on the each stator. After this the stators are baked in the oven and once ready the magnets and back-irons are put onto the stator. Shown below in Figure 3-11 is an assembly tool designed... rings. The bearing and its support rings were then carried onto the test rig and mounted at one end of the table. Throughout the assembly process a lot of care had to be taken so as to avoid damaging of the permanent magnets, stator and its coils...

  5. Rehabilitate Newsome Creek Watershed, 2007-2008 Annual Report.

    SciTech Connect (OSTI)

    Bransford, Stephanie [Nez Perce Tribe Fisheries/Watershed Program

    2009-05-01T23:59:59.000Z

    The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridgetop approach. The Nez Perce Tribe (NPT) and the Nez Perce National Forest (NPNF) have formed a partnership in completing watershed restoration activities, and through this partnership more work is accomplished by sharing funding and resources in our effort. The Nez Perce Tribe began watershed restoration projects within the Newsome Creek watershed of the South Fork Clearwater River in 1997. Progress has been made in restoring the watershed through road decommissioning and culvert replacement. Starting in FY 2001 and continuing into the present, a major stream restoration effort on the mainstem of Newsome Creek has been pursued. From completing a watershed assessment to a feasibility study of 4 miles of mainstem rehabilitation to carrying that forward into NEPA and a final design, we will begin the effort of restoring the mainstem channel of Newsome Creek to provide spawning and rearing habitat for anadromous and resident fish species. Roads have been surveyed and prioritized for removal or improvement as well as culverts being prioritized for replacement to accommodate fish passage throughout the watershed.

  6. Dry Creek salt dome, Mississippi Interior Salt basin

    SciTech Connect (OSTI)

    Montgomery, S.L.; Ericksen, R.L.

    1997-03-01T23:59:59.000Z

    Recent drilling of salt dome flanks in the Mississippi Salt basin has resulted in important new discoveries and the opening of a frontier play. This play is focused on gas/condensate reserves in several Cretaceous formations, most notably the Upper Cretaceous Eutaw and lower Tuscaloosa intervals and Lower Cretaceous Paluxy and Hosston formations. As many as eight domes have been drilled thus far; sandstones in the upper Hosston Formation comprise the primary target. Production has been as high as 3-5 Mcf and 500-1200 bbl of condensate per day, with estimated ultimate reserves in the range of 0.2 to 1.5 MBOE (million barrels oil equivalent) per well. As typified by discovery at Dry Creek salt dome, traps are related to faulting, unconformities, and updip loss of permeability. Previous drilling at Dry Creek, and in the basin generally, avoided the flank areas of most domes, due to geologic models that predicted latestage (Tertiary) piercement and breached accumulations. Recent data from Dry Creek and other productive domes suggest that growth was episodic and that piercement of Tertiary strata did not affect deeper reservoirs charged with hydrocarbons in the Late Cretaceous.

  7. Swift Creek Hydroelectric Project rehabilitation, Swift Creek Power Company, Inc. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    The purpose of this report is to re-evaluate and update the original environmental analysis of the Swift Crook Hydroelectric Project rehabilitation. That analysis and the decision to allow the proponent toproceed with the project as described in the EA alternatives 3, 4, and 5 was completed an May 8, 1981. Since that decision, no action has been taken and no special-use permit has ever been issued. The Bridger-Trton National Forest completed a Forest Plan in March of 1990 which sets current direction for all lands within the Forest and new and significant issues pertaining to the amount of water to be bypassed have been raised by the public in response to this proposed project. The original proponent, Lower Valley Power and Light, sold the project and existing facilities to Swift Crack Power Company Inc. in 1984. Swift Crock Power Company has submitted a proposal to rehabilitate the existing power generation facility in Swift Creek Canyon, which will involve some significant construction and alteration of the river corridor. Theyhave also submitted an application for relicense to the Federal Energy Regulatory Commission who has asked for the Forest Service to comment on the application and to submit recommended conditions for approval (4e requirements). The proposed rehabilitation of existing facilities includes replacement of the existing damaged penstock (pipe) with a new, larger one; dredging two existing reservoirs and removal, refurbishment, and reinstallation of the turbines and generators in the two powerhouses with relocation and reconstruction of the lower powerhouse that is located on privately owned land below the Forest boundary.

  8. Assessment of Water Resources and Watershed Conditions in Moores Creek National Battlefield, North Carolina

    E-Print Network [OSTI]

    Mallin, Michael

    Assessment of Water Resources and Watershed Conditions in Moores Creek National Battlefield, North Assessment of Park Water Resources.......................................................................25 resources........................................................................15 Biological resources

  9. Hydrology of Deer Creek and its tributaries : a contribution to planning a restoration project

    E-Print Network [OSTI]

    Skrtic, Lana

    2005-01-01T23:59:59.000Z

    data is not useful in developing a flood frequency curve for Deer Creek because the gauge records discharge from the powerhouse. (

  10. Microsoft Word - Spring Creek Final Draft CX 7-15-2013.docx

    Broader source: Energy.gov (indexed) [DOE]

    Cecilia Brown Project Manager - KEWM-4 Proposed Action: Spring Creek Property funding Fish and Wildlife Project No. and Contract No.: 2002-003-00, BPA-007168 Categorical...

  11. Microsoft Word - CX_PerryCreek_4.29.11.doc

    Broader source: Energy.gov (indexed) [DOE]

    Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Montana Fish, Wildlife and Parks for purchase of the Perry Creek Property. Fish and Wildlife Project...

  12. Microsoft Word - 2012_Rapid_Lightening_Creek_Easement_CX_Rev2...

    Broader source: Energy.gov (indexed) [DOE]

    Manager - KEWM-4 Proposed Action: AMENDED Provision of funds to the Idaho Department of Fish and Game (IDFG) to purchase the Rapid Lightning Creek Property. Fish and Wildlife...

  13. Assessing the Feasibility of Creek Daylighting in San Francisco, Part I: A Synthesis of Lessons Learned from Existing Urban Daylighting Projects

    E-Print Network [OSTI]

    Smith, Brooke Ray

    2007-01-01T23:59:59.000Z

    and Leonardson 2004). Why Daylight? In San Francisco, creekof San Francisco to daylight historical urban creeks withincity governments to daylight urban creeks, with successful

  14. advanced permanent magnet: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    magnetic poles, so of generation of magnetic elds in astrophysical objects (or in electrically conducting uids) constitutes Khesin, Boris A. 68 Radiation hardness of permanent...

  15. adjustable strength permanent: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and model the typical failure Michalowski, Radoslaw L. 140 Permanent magnet assisted synchronous reluctance motor, design and performance improvement Texas A&M University...

  16. axial flux permanent: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    de 13 Design and analysis aspects of radial flux air-cored permanent magnet wind generator system for direct battery charging applications. Open Access Theses and...

  17. analysis reveals permanent: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Index 21 Design and analysis aspects of radial flux air-cored permanent magnet wind generator system for direct battery charging applications. Open Access Theses and...

  18. A Probabilistic Water Resources Assessment of the Paradise Creek Watershed Presented in Partial Fulfillment of the Requirements for the

    E-Print Network [OSTI]

    Fiedler, Fritz R.

    A Probabilistic Water Resources Assessment of the Paradise Creek Watershed A Thesis Presented Probabilistic Water Resources Assessment of the Paradise Creek Watershed," has been reviewed in final form ____________________________________Date____________ Margrit von Braun #12;iii iii A Probabilistic Water Resources Assessment

  19. A SECOND LOOK AT THE SAFETY EFFECTIVENESS OF THE MYRTLE CREEK ADVANCED CURVE WARNING SYSTEM

    E-Print Network [OSTI]

    Bertini, Robert L.

    -1- A SECOND LOOK AT THE SAFETY EFFECTIVENESS OF THE MYRTLE CREEK ADVANCED CURVE WARNING SYSTEM as the "Myrtle Creek Curves." This location consists of a series of curves which have continually been a notable. The curves are located in a 50 mile per hour (mph) speed zone and are posted with an advisory speed of 45 mph

  20. Ice Climbing in Clear Creek Canyon A climbing trip report by Glenn Murray

    E-Print Network [OSTI]

    Ice Climbing in Clear Creek Canyon A climbing trip report by Glenn Murray SUMMARY: I climb ice in to ask about local climbing. The guys there told me there was ice nearby, in Clear Creek Canyon. I. Four pitches? Five? It was time to find a partner. The only ice climber I knew in Denver was a friend

  1. Explores Dam Removal Located in Southwest Ohio, Buck Creek and its

    E-Print Network [OSTI]

    Bogaerts, Steven

    OHIO Researcher Explores Dam Removal Located in Southwest Ohio, Buck Creek and its tributary, Beaver Creek, run through a series of low-head dams in Springfield, Ohio. Historically, the four dams of the four dams. This will help restore the natural flow of sediments and fish along the entire river

  2. An analysis of energy expenditure in Goodwin Creek Peter Molnar and Jorge A. Ramirez

    E-Print Network [OSTI]

    Ramírez, Jorge A.

    An analysis of energy expenditure in Goodwin Creek Peter Molna´r and Jorge A. Rami´rez Department with recent observations of channel change in Goodwin Creek. This energy expenditure analysis suggests of energy dissipation per unit channel area, Pa, is constant throughout the river network is explored

  3. Lost Creek, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:Landowners andLodgepole, Nebraska:LongboardLoretto,Los(RedirectedCreek, Texas:

  4. Brushy Creek, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainable and InnovativeBrookmont,Florida: EnergyVirginia:Brushy Creek,

  5. Burnt Creek-Riverview, North Dakota: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainable andBucoda,Burke County,Information Burnt Creek-Riverview,

  6. White Creek Wind Power Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTri GlobalJump to:Westwood Renewables Jump to:meaningWillow I WindCreek

  7. Hunters Creek, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty, Texas: Energy Resources Jump to:Hunter,Creek, Florida:

  8. Pebble Creek, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri:EnergyOssian,Parle Biscuits PvtPawPearland, Texas: EnergyPebble Creek,

  9. Pike Creek, Delaware: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal PwerPerkins County, Nebraska: Energy ResourcesPicket Lake,Hampshire:Illinois:62363°,Ohio:Creek,

  10. Indian Creek, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty,Jump7 Varnish cacheTransport and BuildingCreek, Florida:

  11. Smith Creek Valley Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f < RAPID‎ |RippeyInformation SlimSloughCreek Geothermal

  12. Grape Creek, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG Contracting JumpGoveNebraska: Energy ResourcesSouth,Grape Creek,

  13. Swartz Creek, Michigan: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries PvtStratosolar Jump to:Holdings Co LtdLLC Place:Svartsengi GeothermalSwartz Creek,

  14. Big Creek Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon,Belcher Homes JumpMaintenance |Big Creek Hot Springs

  15. Birch Creek Village Elec Util | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon,Belcher HomesLyonsBirch Creek Village Elec Util Jump to:

  16. LaCreek Electric Assn, Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |Jilin Zhongdiantou NewKorea PartsLLNL Energy FlowLODLPKFLaLaCreek

  17. Workplace Charging Challenge Partner: ClipperCreek, Inc. | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: SinceDevelopment | Department ofPartnershipsAngieTerriDepartment ofEnergy ClipperCreek, Inc.

  18. Barton Creek, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomass Conversions Inc JumpIMBarnard,Barrow County,Kansas: EnergyCreek, Texas:

  19. Bear Creek, Alaska: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomass Conversions IncBay County, Florida:Tyngsboro, MassachusettsCreek, Alaska:

  20. Bear Creek, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomass Conversions IncBay County, Florida:Tyngsboro, MassachusettsCreek,

  1. Fourche Creek Wastewater Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdf Jump to:ar-80m.pdfFillmoreGabbsSalonga, NewCorners InternationalFourche Creek

  2. Francis Creek, Wisconsin: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdf Jump to:ar-80m.pdfFillmoreGabbsSalonga,Francis Creek, Wisconsin: Energy

  3. Fritz Creek, Alaska: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdf Jump1946865°, -86.0529604° ShowCounty, California: Energyof theFrioCreek,

  4. Two Creeks, Wisconsin: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga, IndianaTurtle Airships Jump to:Twiggs County,EnergyEnergyOpenCreeks,

  5. Coal Creek, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, clickInformationNew York: Energy Resources JumpCloverCounty, Oklahoma:Creek,

  6. Deer Creek Hot Spring Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualPropertyd8c-a9ae-f8521cbb8489 No revision hasda62829c05b NoCounty, Nevada | OpenDeepiDeer Creek

  7. Results of the radiological survey at Two Mile Creek, Tonawanda, New York (TNY002)

    SciTech Connect (OSTI)

    Murray, M.E.; Rodriguez, R.E.; Uziel, M.S.

    1997-08-01T23:59:59.000Z

    At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at Two Mile Creek, Tonawanda, New York. The survey was performed in November 1991 and May 1996. The purpose of the survey was to determine if radioactive materials from work performed under government contract at the Linde Air Products Division of Union Carbide Corporation, Tonawanda, New York, had been transported into the creek. The survey included a surface gamma scan in accessible areas near the creek and the collection of soil, sediment, and core samples for radionuclide analyses. Survey results indicate that no significant material originating at the Linde plant is presently in the creek. Three of the 1991 soil sample locations on the creek bank and one near the lake contained slightly elevated concentrations of {sup 238}U with radionuclide distributions similar to that found in materials resulting from former processing activities at the Linde site.

  8. Permanent magnet energy conversion machine with magnet mounting arrangement

    DOE Patents [OSTI]

    Hsu, John S. (Oak Ridge, TN); Adams, Donald J. (Knoxville, TN)

    1999-01-01T23:59:59.000Z

    A hybrid permanent magnet dc motor includes three sets of permanent magnets supported by the rotor and three sets of corresponding stators fastened to the surrounding frame. One set of magnets operates across a radial gap with a surrounding radial gap stator, and the other two sets of magnets operate off the respective ends of the rotor across respective axial gaps.

  9. Asotin Creek Model Watershed Plan: Asotin County, Washington, 1995.

    SciTech Connect (OSTI)

    Browne, Dave

    1995-04-01T23:59:59.000Z

    The Northwest Power Planning Council completed its ``Strategy for Salmon'' in 1992. This is a plan, composed of four specific elements,designed to double the present production of 2.5 million salmon in the Columbia River watershed. These elements have been called the ``four H's'': (1) improve harvest management; (2) improve hatcheries and their production practices; (3) improve survival at hydroelectric dams; and (4) improve and protect fish habitat. The Asotin Creek Model Watershed Plan is the first to be developed in Washington State which is specifically concerned with habitat protection and restoration for salmon and trout. The plan is consistent with the habitat element of the ``Strategy for Salmon''. Asotin Creek is similar in many ways to other salmon-bearing streams in the Snake River system. Its watershed has been significantly impacted by human activities and catastrophic natural events, such as floods and droughts. It supports only remnant salmon and trout populations compared to earlier years. It will require protection and restoration of its fish habitat and riparian corridor in order to increase its salmonid productivity.

  10. Vegetation survey of Pen Branch and Four Mile Creek wetlands

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    One hundred-fifty plots were recently sampled (vegetational sampling study) at the Savannah River Site (SRS). An extensive characterization of the vascular flora, in four predetermined strata (overstory, Understory, shrub layer, and ground cover), was undertaken to determine dominance, co-dominance, and the importance value (I.V.) of each species. These results will be used by the Savannah River Laboratory (SRL) to evaluate the environmental status of Four Mile Creek, Pen Branch, and two upland pine stands. Objectives of this study were to: Describe in detail the plant communities previously mapped with reference to the topography and drainage, including species of plants present: Examine the successional trends within each sampling area and describe the extent to which current vegetation communities have resulted from specific earlier vegetation disturbances (e.g., logging and grazing); describe in detail the botanical field techniques used to sample the flora; describe the habitat and location of protected and/or rare species of plants; and collect and prepare plant species as herbarium quality specimens. Sampling was conducted at Four Mile Creek and Pen Branch, and in two upland pine plantations of different age growth.

  11. Vegetation survey of Pen Branch and Four Mile Creek wetlands

    SciTech Connect (OSTI)

    Not Available

    1992-01-01T23:59:59.000Z

    One hundred-fifty plots were recently sampled (vegetational sampling study) at the Savannah River Site (SRS). An extensive characterization of the vascular flora, in four predetermined strata (overstory, Understory, shrub layer, and ground cover), was undertaken to determine dominance, co-dominance, and the importance value (I.V.) of each species. These results will be used by the Savannah River Laboratory (SRL) to evaluate the environmental status of Four Mile Creek, Pen Branch, and two upland pine stands. Objectives of this study were to: Describe in detail the plant communities previously mapped with reference to the topography and drainage, including species of plants present: Examine the successional trends within each sampling area and describe the extent to which current vegetation communities have resulted from specific earlier vegetation disturbances (e.g., logging and grazing); describe in detail the botanical field techniques used to sample the flora; describe the habitat and location of protected and/or rare species of plants; and collect and prepare plant species as herbarium quality specimens. Sampling was conducted at Four Mile Creek and Pen Branch, and in two upland pine plantations of different age growth.

  12. Remediation cleanup options for the Hoe Creek UCG site

    SciTech Connect (OSTI)

    Nordin, J.; Griffin, W.; Chatwin, T.; Lindblom, S.; Crader, S.

    1990-03-01T23:59:59.000Z

    The US Department of Energy must restore groundwater quality at the Hoe Creek, Wyoming, underground coal gasification site using the best proven practicable technology. Six alternative remediation methods are evaluated in this project: (1) excavation, (2) three variations of groundwater plume containment, (3) in situ vacuum extraction, (4) pump and treat using a defined pattern of pumping wells to obtain an effective matrix sweep, (5) in situ flushing using a surfactant, and (6) in situ bioremediation. Available site characterization data is insufficient to accurately project the cost of remediation. Several alternative hypothetical examples and associated costs are described in the text and in the appendices. However, not enough information is available to use these examples as a basis for comparison purposes. Before a cleanup method is selected, core borings should be taken to define the areal extent and depth of contaminated matrix material. Segments of these core borings should be analyzed for organic contaminants in the soil (e.g., benzene) and their relationship to the groundwater contamination. These analyses and subsequent treatability studies will show whether or not the contaminants can be effectively removed by surface on in situ volatilization, leached from the matrix using washing solutions, or removed by bioremediation. After this information is obtained, each technology should be evaluated with respect to cost and probability of success. A decision tree for implementing remediation cleanup at the Hoe Creek site is presented in this report. 26 refs., 11 figs., 3 tabs.

  13. Groundwater contamination near the Hoe Creek UCG experiments

    SciTech Connect (OSTI)

    Wang, F.T.; Mead, S.W.; Stuermer, D.H.

    1981-01-01T23:59:59.000Z

    It has been shown that underground coal gasification (UCG) may introduce a broad range of residual gasification products into the groundwater of a coal aquifer. Sorption of many contaminants by the coal itself is an important factor in restricting the migration of these contaminants in the groundwater. However, our field studies, conducted at Lawrence Livermore National Laboratory's Hoe Creek site, have shown that sorption of organic compounds by coal is not as effective as expected, perhaps because the coal surface area is limited. Furthermore, if severe roof collapse has taken place during gasification, non-coal aquifers located above the gasified coal seam may be interconnected with the coal aquifer, and contaminants may enter these non-coal aquifers, in which sorption is even less effective. The Hoe Creek II and III experiments have provided us with opportunities to study the contamination of a sand aquifer located above a gasified coal seam in a hydrological recharge area. Our preliminary results indicate that the water in the overlying sand aquifer is much less contaminated with organic compounds than the water in the gasified coal aquifer. In conducting these field investigations, we have also learned valuable lessons concerning groundwater monitoring. A suggested monitoring strategy will be discussed.

  14. Water Conservation Study for Manastash Creek Water Users, Kittias County, Washington, Final Report 2002.

    SciTech Connect (OSTI)

    Montgomery Watson Harza (Firm)

    2002-12-31T23:59:59.000Z

    Manastash Creek is tributary of the Yakima River and is located southwest and across the Yakima River from the City of Ellensburg. The creek drains mountainous terrain that ranges in elevation from 2,000 feet to over 5,500 feet and is primarily snowmelt fed, with largest flows occurring in spring and early summer. The creek flows through a narrow canyon until reaching a large, open plain that slopes gently toward the Yakima River and enters the main stem of the Yakima River at river mile 154.5. This area, formed by the alluvial fan of the Creek as it leaves the canyon, is the subject of this study. The area is presently dominated by irrigated agriculture, but development pressures are evident as Ellensburg grows and develops as an urban center. Since the mid to late nineteenth century when irrigated agriculture was established in a significant manner in the Yakima River Basin, Manastash Creek has been used to supply irrigation water for farming in the area. Adjudicated water rights dating back to 1871 for 4,465 acres adjacent to Manastash Creek allow appropriation of up to 26,273 acre-feet of creek water for agricultural irrigation and stock water. The diversion of water from Manastash Creek for irrigation has created two main problems for fisheries. They are low flows or dewatered reaches of Manastash Creek and fish passage barriers at the irrigation diversion dams. The primary goal of this study, as expressed by Yakama Nation and BPA, is to reestablish safe access in tributaries of the Yakima River by removing physical barriers and unscreened diversions and by adding instream flow where needed for fisheries. The goal expressed by irrigators who would be affected by these projects is to support sustainable and profitable agricultural use of land that currently uses Manastash Creek water for irrigation. This study provides preliminary costs and recommendations for a range of alternative projects that will partially or fully meet the goal of establishing safe access for fisheries in Manastash Creek by reducing or eliminating diversions and eliminating fish passage barriers. Further study and design will be necessary to more fully develop the alternatives, evaluate their environmental benefits and impacts and determine the effect on Manastash Creek water users. Those studies will be needed to determine which alternative has the best combination of benefits and costs, and meets the goal of the Manastash Creek water users.

  15. Chapter 3 -Basic Water Quality in the Boulder Creek Watershed, Colorado, During High-Flow and Low-Flow Conditions, 2000

    E-Print Network [OSTI]

    Chapter 3 - Basic Water Quality in the Boulder Creek Watershed, Colorado, During High-Flow and Low of the water quality of Boulder Creek, Colorado, during high-flow and low-flow conditions in the year 2000 constituents in Boulder Creek increased after the creek received wastewater effluent. INTRODUCTION Two programs

  16. Couse/Tenmile Creeks Watershed Project Implementation : 2007 Conservtion Projects. [2007 Habitat Projects Completed].

    SciTech Connect (OSTI)

    Asotin County Conservation District

    2008-12-10T23:59:59.000Z

    The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on private lands within Asotin County watersheds. The Tenmile Creek watershed is a 42 square mile tributary to the Snake River, located between Asotin Creek and the Grande Ronde River. Couse Creek watershed is a 24 square mile tributary to the Snake River, located between Tenmile Creek and the Grande Ronde River. Both watersheds are almost exclusively under private ownership. The Washington Department of Fish and Wildlife has documented wild steelhead and rainbow/redband trout spawning and rearing in Tenmile Creek and Couse Creek. The project also provides Best Management Practice (BMP) implementation throughout Asotin County, but the primary focus is for the Couse and Tenmile Creek watersheds. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Farm Service Agency (FSA), Salmon Recovery Funding Board (SRFB), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe (NPT), Washington Department of Ecology (DOE), National Marine Fisheries Service (NOAA Fisheries), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. The Asotin Subbasin Plan identified priority areas and actions for ESA listed streams within Asotin County. Couse Creek and Tenmile Creek are identified as protection areas in the plan. The Conservation Reserve Enhancement Program (CREP) has been successful in working with landowners to protect riparian areas throughout Asotin County. Funding from BPA and other agencies has also been instrumental in protecting streams throughout Asotin County by utilizing the ridge top to ridge top approach.

  17. Rectangular Scotttype Permanents GuoNiu Han et Christian Krattenthaler

    E-Print Network [OSTI]

    Krattenthaler, Christian

    )) 1ŸiŸn; 1ŸjŸm , here named ``Scott­type'' permanent, the case of P (x) = x n \\Gamma 1 and Q(y) = y n and of Scott's permanent itself. For example, we prove that if P (x) = x n \\Gamma 1 and Q(y) = y 2n + y n + 1Ÿm , appel'e ici permanent de type Scott. Le cas de P (x) = x n \\Gamma 1 et Q(y) = y n + 1 a 'et'e consid

  18. Brood Year 2004: Johnson Creek Chinook Salmon Supplementation Report, June 2004 through March 2006.

    SciTech Connect (OSTI)

    Gebhards, John S.; Hill, Robert; Daniel, Mitch [Nez Perce Tribe

    2009-02-19T23:59:59.000Z

    The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River spring/summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek to spawn through artificial propagation. This was the sixth season of adult chinook broodstock collection in Johnson Creek following collections in 1998, 2000, 2001, 2002, and 2003. Weir installation was completed on June 21, 2004 with the first chinook captured on June 22, 2004 and the last fish captured on September 6, 2004. The weir was removed on September 18, 2004. A total of 338 adult chinook, including jacks, were captured during the season. Of these, 211 were of natural origin, 111 were hatchery origin Johnson Creek supplementation fish, and 16 were adipose fin clipped fish from other hatchery operations and therefore strays into Johnson Creek. Over the course of the run, 57 natural origin Johnson Creek adult chinook were retained for broodstock, transported to the South Fork Salmon River adult holding and spawning facility and held until spawned. The remaining natural origin Johnson Creek fish along with all the Johnson Creek supplementation fish were released upstream of the weir to spawn naturally. Twenty-seven Johnson Creek females were artificially spawned with 25 Johnson Creek males. Four females were diagnosed with high bacterial kidney disease levels resulting in their eggs being culled. The 27 females produced 116,598 green eggs, 16,531 green eggs were culled, with an average eye-up rate of 90.6% resulting in 90,647 eyed eggs. Juvenile fish were reared indoors at the McCall Fish Hatchery until November 2005 and then transferred to the outdoor rearing facilities during the Visual Implant Elastomer tagging operation. These fish continued rearing in the outdoor collection basin until release in March 2006. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags. In addition 12,056 of the smolts released were also tagged with Passive Integrated Transponder tags. Hand counts provided by marking crews were used to amend the number of juvenile salmon released from the original egg count. A total of 90,450 smolts were released directly into Johnson Creek on March 13 through 15, 2006.

  19. EA-1988: NFSC (Northwest Fisheries Science Center) Earthen Drainage Channel, Burley Creek Hatchery, Port Orchard, Washington

    Broader source: Energy.gov [DOE]

    The National Oceanic and Atmospheric Administration (NOAA), with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of a NOAA Northwest Fisheries Science Center proposal to construct an earthen drainage channel at its Burley Creek Hatchery in Kitsap County, Washington. The project would facilitate increased discharge of treated effluent from the hatchery facility into the adjacent Burley Creek. BPA’s proposal is to fund the project. The project website is http://efw.bpa.gov/environmental_services/Document_Library/Burley_Creek/.

  20. Campbell Creek Research Homes FY 2012 Annual Performance Report

    SciTech Connect (OSTI)

    Gehl, Anthony C [ORNL; Munk, Jeffrey D [ORNL; Jackson, Roderick K [ORNL; Boudreaux, Philip R [ORNL; Khowailed, Gannate A [ORNL

    2013-01-01T23:59:59.000Z

    The Campbell Creek project is funded and managed by the Tennessee Valley Authority (TVA) Technology Innovation, Energy Efficiency, Power Delivery & and Utilization Office. Technical support is provided under contract by the Oak Ridge National Laboratory (ORNL) and the Electric Power Research Institute.The project was designed to determine the relative energy efficiency of typical new home construction, energy efficiency retrofitting of existing homes, and high -performance new homes built from the ground up for energy efficiency. This project will compare three houses that represented the current construction practice as a base case (Builder House CC1); a modified house that could represent a major energy- efficient retrofit (Retrofit House CC2); and a house constructed from the ground up to be a high- performance home (High Performance House CC3). In order tTo enablehave a valid comparison, it was necessary to simulate occupancy in all three houses and heavily monitor the structural components and the energy usage by component. All three houses are two story, slab on grade, framed construction. CC1 and CC2 are approximately 2,400 square feet2. CC3 has a pantry option, that is primarily used as a mechanical equipment room, that adds approximately 100 square feet2. All three houses are all-electric (with the exception of a gas log fireplace that is not used during the testing), and use air-source heat pumps for heating and cooling. The three homes are located in Knoxville in the Campbell Creek Subdivision. CC1 and CC2 are next door to each other and CC3 is across the street and a couple of houses down. The energy data collected will be used to determine the benefits of retrofit packages and high -performance new home packages. There are over 300 channels of continuous energy performance and thermal comfort data collection in the houses (100 for each house). The data will also be used to evaluate the impact of energy -efficient upgrades ton the envelope, mechanical equipment, or demand -response options. Each retrofit will be evaluated incrementally, by both short -term measurements and computer modeling, using a calibrated model. This report is intended to document the comprehensive testing, data analysis, research, and findings within the January 2011 through October 2012 timeframe at the Campbell Creek research houses. The following sections will provide an in-depth assessment of the technology progression in each of the three research houses. A detailed assessment and evaluation of the energy performance of technologies tested will also be provided. Finally, lessons learned and concluding remarks will be highlighted.

  1. Permanent magnet assisted synchronous reluctance motor, design and performance improvement

    E-Print Network [OSTI]

    Niazi, Peyman

    2006-04-12T23:59:59.000Z

    Recently, permanent magnet assisted (PMa)-synchronous reluctance motors (SynRM) have been considered as a possible alternative motor drive for high performance applications. In order to have an efficient motor drive, performing of three steps...

  2. Permanent magnet assisted synchronous reluctance motor, design and performance improvement 

    E-Print Network [OSTI]

    Niazi, Peyman

    2006-04-12T23:59:59.000Z

    Recently, permanent magnet assisted (PMa)-synchronous reluctance motors (SynRM) have been considered as a possible alternative motor drive for high performance applications. In order to have an efficient motor drive, ...

  3. Permanence : aligning architecture, nuclear waste, and the Public

    E-Print Network [OSTI]

    Maher, John, III (John Edward)

    2014-01-01T23:59:59.000Z

    Permanence is intended as a provocation to question the current relationship of time and architecture. Architecture has always had a relationship with time, but historically this relationship has been troubled. In 2013 we ...

  4. Method and apparatus for assembling permanent magnet rotors

    DOE Patents [OSTI]

    Hsu, J.S.; Adams, D.J.

    1999-06-22T23:59:59.000Z

    A permanent magnet assembly for assembly in large permanent magnet motors and generators includes a two-piece carrier that can be slid into a slot in the rotor and then secured in place using a set screw. The invention also provides an auxiliary carrier device with guide rails that line up with the teeth of the rotor, so that a permanent magnet assembly can be pushed first into a slot, and then down the slot to its proper location. An auxiliary tool is provided to move the permanent magnet assembly into position in the slot before it is secured in place. Methods of assembling and disassembling the magnet assemblies in the rotor are also disclosed. 2 figs.

  5. Adjustable permanent magnet assembly for NMR and MRI

    DOE Patents [OSTI]

    Pines, Alexander; Paulsen, Jeffrey; Bouchard, Louis S; Blumich, Bernhard

    2013-10-29T23:59:59.000Z

    System and methods for designing and using single-sided magnet assemblies for magnetic resonance imaging (MRI) are disclosed. The single-sided magnet assemblies can include an array of permanent magnets disposed at selected positions. At least one of the permanent magnets can be configured to rotate about an axis of rotation in the range of at least +/-10 degrees and can include a magnetization having a vector component perpendicular to the axis of rotation. The single-sided magnet assemblies can further include a magnet frame that is configured to hold the permanent magnets in place while allowing the at least one of the permanent magnets to rotate about the axis of rotation.

  6. Review of underground coal gasification field experiments at Hoe Creek

    SciTech Connect (OSTI)

    Thorsness, C.B.; Creighton, J.R.

    1983-01-01T23:59:59.000Z

    LLNL has conducted three underground coal gasification experiments at the Hoe Creek site near Gillette, WY. Three different linking methods were used: explosive fracturing, reverse burning and directional drilling. Air was injected on all three experiments and a steam/oxygen mixture during 2 days of the second and most of the third experiment. Comparison of results show that the linking method didn't influence gas quality. The heat of combustion of the product gas was higher with steam/oxygen injection, mainly because of reduced inert diluent. Gas quality was generally independent of other operating parameters, but declined from its initial value over a period of time. This was due to heat loss to the wet overburden and extensive roof collapse in the second and third experiments.

  7. Review of underground coal gasification field experiments at Hoe Creek

    SciTech Connect (OSTI)

    Thorsness, C.B.; Creighton, J.R.

    1983-01-01T23:59:59.000Z

    In three underground coal gasification experiments at the Hoe Creek site near Gillette, WY, LLNL applied three different linking methods: explosive fracture, reverse burning, and directional drilling. Air was injected in all three experiments; a steam/oxygen mixture, during 2 days of the second and most of the third experiment. Comparison of results show that the type of linking method did not influence gas quality. The heat of combustion of the product gas was higher with steam/oxygen injection, mainly because of reduced inert diluent. Gas quality was generally independent of other operating parameters but declined from its initial value over a period of time because of heat loss to the wet overburden and extensive roof collapse in the second and third experiments.

  8. The Elk Creek Carbonatite, Southeast Nebraska-An Overview

    SciTech Connect (OSTI)

    Carlson, M. P., E-mail: mcarlson1@unl.edu; Treves, S. B. [University of Nebraska, Nebraska Geological Survey (United States)

    2005-03-15T23:59:59.000Z

    A framework geophysical program in southeastern Nebraska during 1970 identified a near-circular feature having gravity relief of about 8 mgal and a magnetic anomaly of about 800 gammas. Analysis of the geophysical data provided a model of a cylindrical mass of indefinite length with a radius of 5500 ft (1676 m) and beveled at the basement surface at about 600 ft (183 m). At the approximate depth at which Precambrian rocks were expected, the initial test hole (2-B-71) encountered an iron-rich weathered zone overlying carbonate-rich rock. The carbonate rocks consist essentially of dolomite, calcite, and ankerite and lesser amounts of hematite, chlorite, phlogopite, barite, serpentine, pyrochlore, and quartz and contain barium, strontium, and rare earths. Total REE, P2O5, and 87Sr/86Sr ratios confirm the carbonatite identification. Texturally, the rocks range from fragmental to contorted to massive. Associated with the carbonatite are lesser amounts of basalt, lamprophyre, and syenite. Additional exploratory drilling has provided about 80,000 ft (24,384 m) of rock record and has penetrated about 3400 ft (1038 m) of carbonatite. The carbonatite is overlain by marine sediments of Pennsylvanian (Missourian) age. The surrounding Precambrian basement rocks are low-to medium-grade metamorphic gneiss and schist of island arc origin and granitic plutons. The Elk Creek carbonatite is located near the boundary between the Penokean orogen created at about 1.84 Ga (billion years) and the Dawes terrane (1.78 Ga) of the Central Plains orogen. This boundary strongly influenced the geometry of both the Midcontinent Rift System (1.1 Ga) and the Nemaha uplift (0.3 Ga). It is assumed that the emplacement of the Elk Creek carbonatite (0.5 Ga) was influenced similarly by the pre-existing tectonic sutures.

  9. Permanent Breast Seed Implant Dosimetry Quality Assurance

    SciTech Connect (OSTI)

    Keller, Brian M., E-mail: Brian.Keller@sunnybrook.ca [Department of Medical Physics, Sunnybrook Health Sciences Center, Toronto, ON (Canada); Department of Radiation Oncology, University of Toronto, Sunnybrook Health Sciences Center, Toronto, ON (Canada); Ravi, Ananth [Department of Medical Physics, Sunnybrook Health Sciences Center, Toronto, ON (Canada); Sankreacha, Raxa [Carlo Fidani Regional Cancer Center, Mississauga, ON (Canada); Pignol, Jean-Philippe [Department of Radiation Oncology, University of Toronto, Sunnybrook Health Sciences Center, Toronto, ON (Canada)

    2012-05-01T23:59:59.000Z

    Purpose: A permanent breast seed implant is a novel method of accelerated partial breast irradiation for women with early-stage breast cancer. This article presents pre- and post-implant dosimetric data, relates these data to clinical outcomes, and makes recommendations for those interested in starting a program. Methods and Materials: A total of 95 consecutive patients were accrued into one of three clinical trials after breast-conserving surgery: a Phase I/II trial (67 patients with infiltrating ductal carcinoma); a Phase II registry trial (25 patients with infiltrating ductal carcinoma); or a multi-center Phase II trial for patients with ductal carcinoma in situ (3 patients). Contouring of the planning target volume (PTV) was done on a Pinnacle workstation and dosimetry calculations, including dose-volume histograms, were done using a Variseed planning computer. Results: The mean pre-implant PTV coverage for the V{sub 90}, V{sub 100}, V{sub 150}, and V{sub 200} were as follows: 98.8% {+-} 1.2% (range, 94.5-100%); 97.3% {+-} 2.1% (range, 90.3-99.9%), 68.8% {+-} 14.3% (range, 32.7-91.5%); and 27.8% {+-} 8.6% (range, 15.1-62.3%). The effect of seed motion was characterized by post-implant dosimetry performed immediately after the implantation (same day) and at 2 months after the implantation. The mean V{sub 100} changed from 85.6% to 88.4% (p = 0.004) and the mean V{sub 200} changed from 36.2% to 48.3% (p < 0.001). Skin toxicity was associated with maximum skin dose (p = 0.014). Conclusions: Preplanning dosimetry should aim for a V{sub 90} of approximately 100%, a V{sub 100} between 95% and 100%, and a V{sub 200} between 20% and 30%, as these numbers are associated with no local recurrences to date and good patient tolerance. In general, the target volume coverage improved over the duration of the seed therapy. The maximum skin dose, defined as the average dose over the hottest 1 Multiplication-Sign 1-cm{sup 2} surface area, should be limited to 90% of the prescription dose to minimize delayed skin toxicity.

  10. Tribal Decision-Making and Intercultural Relations: Crow Creek Agency, 1863-1885

    E-Print Network [OSTI]

    Galler, Robert

    2002-03-01T23:59:59.000Z

    Lower Yanktonai residents experienced great change during the first two decades at the Crow Creek agency in Dakota Territory. This essay traces the evolution of relations between tribal members, federal agents, and ...

  11. Rock creek multiple coal streams project. Final report, July 1984-November 1994

    SciTech Connect (OSTI)

    Saulsberry, J.L.; Lambert, S.W.; Wallace, J.A.; Spafford, S.D.; Steidl, P.F.

    1995-12-01T23:59:59.000Z

    The report summarizes the research conducted at the Rock Creek Project from 1984 to 1994. The Rock Creek Project was a field laboratory with the purpose of determining the best methods to produce methane from multiple coal seams. The site is located in the Oak Grove field of the Black Warrior Basin approximately 15 miles west of Birmingham, Alabama. The research performed under the Rock Creek Project involved: resource evaluation, reservoir testing, completion techniques, stimulation design and evaluation, operational methods, production forecasting, and remedial stimulations. Offsite cooperative research with other operators was also performed as part of the project. In addition to developing new technology, the work at Rock Creek demonstrated how existing technology from mining, groundwater hydrology, and the petroleum industry could be applied to coalbed methane production. The work also highlighted the pitfalls associated with some of the technology that was being used by certain operators.

  12. The investigation of the Caney Creek shipwreck archaeological site 41MG32 

    E-Print Network [OSTI]

    Hedrick, David Layne

    1998-01-01T23:59:59.000Z

    documentation exists concerning Caney Creek or its associated trade. Archaeological investigations, however, have revealed several aspects this steamer had in common with other western river steamboats. This thesis will help illustrate western river steamboat...

  13. HYDROGEOLOGIC CONSEQUENCES OF THE MODIFIED IN-SITU RETORTING PROCESS, PICEANCE CREEK BASIN, COLORADO

    E-Print Network [OSTI]

    Mehran, M.

    2014-01-01T23:59:59.000Z

    Water Management in Oil Shale Mining," Volumes I and II,and Technology of Oil Shale," Ann Arbor Science PublishersRequirements at an Oil Shale Surface Mine, Piceance Creek

  14. Microsoft Word - CX-SpringCreek-WineCountry-TowerRelocationFY13...

    Broader source: Energy.gov (indexed) [DOE]

    November 29, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Justin Estes Project Manager - TELM-TPP-3 Proposed Action: Spring Creek - Wine County No. 1...

  15. Review of underground coal-gasification field experiments at Hoe Creek. [Hoe Creek 1, 2, and 3

    SciTech Connect (OSTI)

    Thorsness, C.B.; Creighton, J.R.

    1982-05-26T23:59:59.000Z

    LLNL has conducted three underground coal gasification experiments at the Hoe Creek site near Gillette, Wyoming. Three different linking methods were used: explosive fracture, reverse burning and directional drilling. Air was injected on all three experiments and a steam/oxygen mixture during 2 days of the second and most of the third experiment. Comparison of results show that the linking method didn't influence gas quality. The heat of combustion of the product gas was higher with steam/oxygen injection, mainly because of reduced inert diluent. Gas quality was generally independent of other operating parameters, but declined from its initial value over a period of time. This was due to heat loss to the wet overburden and extensive roof collapse in the second and third experiments.

  16. Geology of the Middle Beaver Creek area, Mason and Gillespie Counties, Texas

    E-Print Network [OSTI]

    Peterson, Don Hamilton

    1959-01-01T23:59:59.000Z

    AREA, NASGR AEG GILhNPIR COGRTIES, TEIAB ABSTRACT The Middle Beaver Creek area is situated on the soutlwsst flank of the Llano ?plift region in Mason and Gillespie Counties, Texas Hooks of Presa?brian, Psleosoie, Mesosois, and Genosois age... ' Figure 1. ? Map of' part of Mason and Gillespie Counties, Texass showing location of' the Middle Beaver Creek Area, on aoetats oosered aerial photographs. In order to aoourateIp locate and plot the oontaots asd faults, the photographs vere studies...

  17. Correlation of stratigraphy with revegetation conditions at the Gibbons Creek Lignite Mine, Grimes County, Texas

    E-Print Network [OSTI]

    Parisot, Laurence D.

    1991-01-01T23:59:59.000Z

    CORRELATION OF STRATIGRAPHY WITH REVEGETATION CONDITIONS AT THE GIBBONS CREEK LIGNITE MINE, GRIMES COUNTY, TEXAS A Thesis by LAURENCE D. PARISOT Submitted to the Office of Graduate Studies of Texas ARM University in partial fulfillment... of the requirements for the degree of MASTER OF SCIENCE December 1991 Major Subject: Geology CORRELATION OF STRATIGRAPHY WITH REVEGETATION CONDITIONS AT THE GIBBONS CREEK LIGNITE MINE, GRIMES COUNTY, TEXAS A Thesis by LAURENCE D. PARISOT ; Approved...

  18. Trout Creek, Oregon Watershed Assessment; Findings, Condition Evaluation and Action Opportunities, 2002 Technical Report.

    SciTech Connect (OSTI)

    Runyon, John

    2002-08-01T23:59:59.000Z

    The purpose of the assessment is to characterize historical and current watershed conditions in the Trout Creek Watershed. Information from the assessment is used to evaluate opportunities for improvements in watershed conditions, with particular reference to improvements in the aquatic environment. Existing information was used, to the extent practicable, to complete this work. The assessment will aid the Trout Creek Watershed Council in identifying opportunities and priorities for watershed restoration projects.

  19. Strong permanent magnets provide a backbone technology required many products, including computers, electric cars, and

    E-Print Network [OSTI]

    McQuade, D. Tyler

    , electric cars, and wind-powered generators. Currently, the strongest permanent magnets contain rare earth

  20. Early post-restoration re-vegetation performance and critical social and institutional factors in a landowner-involved restoration project on lower Wooden Valley Creek, Napa County, CA

    E-Print Network [OSTI]

    Levy, Morgan; Post, Charles

    2010-01-01T23:59:59.000Z

    of the lower Wooden Valley Creek behind McQueeny’s house (Conditions in the Suisun Creek Watershed (Napa/Solano Co. ).Property - South Suisun Creek Watershed Program, Riparian

  1. Fish Bulletin No. 98. The Life Histories of the Steelhead Rainbow Trout (Salmo gairdneri gairdneri) and Silver Salmon (Oncorhynchus kisutch) with Special Reference to Waddell Creek, California, and Recommendations Regarding Their Management

    E-Print Network [OSTI]

    Shapovalov, Leo; Taft, Alan C

    1954-01-01T23:59:59.000Z

    on fish foods in Waddell Creek Lagoon. Amer. Fish. Soc. ,p. 248–251. 1936. The Waddell Creek Experimental Station forsilver salmon from Waddell Creek caught near Fort Bragg.

  2. NORTH HILL CREEK 3-D SEISMIC EXPLORATION PROJECT

    SciTech Connect (OSTI)

    Marc T. Eckels; David H. Suek; Denise H. Harrison; Paul J. Harrison

    2004-05-06T23:59:59.000Z

    Wind River Resources Corporation (WRRC) received a DOE grant in support of its proposal to acquire, process and interpret fifteen square miles of high-quality 3-D seismic data on non-allotted trust lands of the Uintah and Ouray (Ute) Indian Reservation, northeastern Utah, in 2000. Subsequent to receiving notice that its proposal would be funded, WRRC was able to add ten square miles of adjacent state and federal mineral acreage underlying tribal surface lands by arrangement with the operator of the Flat Rock Field. The twenty-five square mile 3-D seismic survey was conducted during the fall of 2000. The data were processed through the winter of 2000-2001, and initial interpretation took place during the spring of 2001. The initial interpretation identified multiple attractive drilling prospects, two of which were staked and permitted during the summer of 2001. The two initial wells were drilled in September and October of 2001. A deeper test was drilled in June of 2002. Subsequently a ten-well deep drilling evaluation program was conducted from October of 2002 through March 2004. The present report discusses the background of the project; design and execution of the 3-D seismic survey; processing and interpretation of the data; and drilling, completion and production results of a sample of the wells drilled on the basis of the interpreted survey. Fifteen wells have been drilled to test targets identified on the North Hill Creek 3-D Seismic Survey. None of these wildcat exploratory wells has been a dry hole, and several are among the best gas producers in Utah. The quality of the data produced by this first significant exploratory 3-D survey in the Uinta Basin has encouraged other operators to employ this technology. At least two additional 3-D seismic surveys have been completed in the vicinity of the North Hill Creek Survey, and five additional surveys are being planned for the 2004 field season. This project was successful in finding commercial oil, natural gas and natural gas liquids production on a remote part of the Uintah & Ouray Reservation. Much of the natural gas and natural gas liquids are being produced from the Wingate Formation, which to our knowledge has never produced commercially anywhere. Another large percentage of the natural gas is being produced from the Entrada Formation which has not previously produced in this part of the Uinta Basin. In all, at least nine geologic formations are contributing hydrocarbons to these wells. This survey has clearly established the fact that high-quality data can be obtained in this area, despite the known obstacles.

  3. Improving Remedial Planning Performance: The Rattlesnake Creek Experience

    SciTech Connect (OSTI)

    Rieman, C.R.; Spector, H.L.; Andrews, S.M. [U.S. Army Corps of Engineers, Buffalo District, 1776 Niagara St., Buffalo, NY 14207 (United States); Durham, L. A.; Johnson, R. L. [Argonne National Laboratory, 9700 S. Cass Ave., EVS 900, Argonne, IL 60439 (United States); Racino, R. R. [Cabrera Services, Inc., 29 Railroad Avenue, Middletown, NY 10940 (United States)

    2006-07-01T23:59:59.000Z

    The U.S. Army Corps of Engineers (USACE), Buffalo District, has responsibility for characterizing and remediating radiologically contaminated properties under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Most of these FUSRAP sites include radionuclide contamination in soils where excavation and offsite disposal is the selected remedial action. For many FUSRAP soil remediation projects completed to date, the excavated contaminated soil volumes have significantly exceeded the pre-excavation volume estimates that were developed for project planning purposes. The exceedances are often attributed to limited and sparse datasets that are used to calculate the initial volume estimates. These volume exceedances complicate project budgeting and planning. Building on these experiences, the USACE took a different approach in the remediation of Rattlesnake Creek, located adjacent to the Ashland 2 site, in Tonawanda, New York. This approach included a more extensive pre-design data collection effort to improve and reduce the uncertainty in the pre-excavation volume estimates, in addition to formalizing final status survey data collection strategies prior to excavation. The final status survey sampling was fully integrated with the pre-design data collection, allowing dual use of the pre-design data that was collected (i.e., using the data to close out areas where contamination was not found, and feeding the data into volume estimates when contamination was encountered). The use of real-time measurement techniques (e.g., X-ray fluorescence [XRF] and gamma walkover surveys) during pre-excavation data collection allowed the USACE to identify and respond to unexpected contamination by allocating additional data collection to characterizing new areas of concern. The final result was an estimated soil volume and excavation footprint with a firm technical foundation and a reduction in uncertainty. However, even with extensive pre-design data collection, additional contamination was found during the excavation that led to an increase in the soil volume requiring offsite disposal. This paper describes the lessons learned regarding improving remedial planning performance from the Rattlesnake Creek experience and evaluates the level of project uncertainty reduction achieved through pre-design data collection. (authors)

  4. A Conceptual Restoration Plan and Tidal Hydrology Assessment for Reconnecting Spring Branch Creek to Suisun Marsh, Solano County, California

    E-Print Network [OSTI]

    Olson, Jessica J.

    2012-01-01T23:59:59.000Z

    EDAW 2007. Potrero Hills Landfill FEIR Volume 1. Solanothe headwaters at Potrero Hills Landfill is the headwatersBranch Creek, Potrero Hills Landfill and a private rancher

  5. C(re)ek-storation Community Collaboration Site: North Fork of Strawberry Creek by La Loma and Le Conte Avenues

    E-Print Network [OSTI]

    Tannenbaum, Sara Rose

    2011-01-01T23:59:59.000Z

    history of urban stream restoration. Aquatic Conservation:on Codornices Creek”. Restoration of Rivers and Streams.Restoration of Rivers and Streams, Water Resources

  6. Method of making bonded or sintered permanent magnets

    DOE Patents [OSTI]

    McCallum, R.W.; Dennis, K.W.; Lograsso, B.K.; Anderson, I.E.

    1995-11-28T23:59:59.000Z

    An isotropic permanent magnet is made by mixing a thermally responsive, low viscosity binder and atomized rare earth-transition metal (e.g., iron) alloy powder having a carbon-bearing (e.g., graphite) layer thereon that facilitates wetting and bonding of the powder particles by the binder. Prior to mixing with the binder, the atomized alloy powder may be sized or classified to provide a particular particle size fraction having a grain size within a given relatively narrow range. A selected particle size fraction is mixed with the binder and the mixture is molded to a desired complex magnet shape. A molded isotropic permanent magnet is thereby formed. A sintered isotropic permanent magnet can be formed by removing the binder from the molded mixture and thereafter sintering to full density. 14 figs.

  7. Method of making bonded or sintered permanent magnets

    DOE Patents [OSTI]

    McCallum, R.W.; Dennis, K.W.; Lograsso, B.K.; Anderson, I.E.

    1993-08-31T23:59:59.000Z

    An isotropic permanent magnet is made by mixing a thermally responsive, low viscosity binder and atomized rare earth-transition metal (e.g., iron) alloy powder having a carbon-bearing (e.g., graphite) layer thereon that facilitates wetting and bonding of the powder particles by the binder. Prior to mixing with the binder, the atomized alloy powder may be sized or classified to provide a particular particle size fraction having a grain size within a given relatively narrow range. A selected particle size fraction is mixed with the binder and the mixture is molded to a desired complex magnet shape. A molded isotropic permanent magnet is thereby formed. A sintered isotropic permanent magnet can be formed by removing the binder from the molded mixture and thereafter sintering to full density.

  8. Method of making bonded or sintered permanent magnets

    DOE Patents [OSTI]

    McCallum, R. William (Ames, IA); Dennis, Kevin W. (Ames, IA); Lograsso, Barbara K. (Ames, IA); Anderson, Iver E. (Ames, IA)

    1995-11-28T23:59:59.000Z

    An isotropic permanent magnet is made by mixing a thermally responsive, low viscosity binder and atomized rare earth-transition metal (e.g., iron) alloy powder having a carbon-bearing (e.g., graphite) layer thereon that facilitates wetting and bonding of the powder particles by the binder. Prior to mixing with the binder, the atomized alloy powder may be sized or classified to provide a particular particle size fraction having a grain size within a given relatively narrow range. A selected particle size fraction is mixed with the binder and the mixture is molded to a desired complex magnet shape. A molded isotropic permanent magnet is thereby formed. A sintered isotropic permanent magnet can be formed by removing the binder from the molded mixture and thereafter sintering to full density.

  9. Permanent-magnet-less machine having an enclosed air gap

    DOE Patents [OSTI]

    Hsu, John S.

    2013-03-05T23:59:59.000Z

    A permanent magnet-less, brushless synchronous system includes a stator that generates a magnetic rotating field when sourced by an alternating current. An uncluttered rotor disposed within the magnetic rotating field is spaced apart from the stator to form an air gap relative to an axis of rotation. A stationary excitation core spaced apart from the uncluttered rotor by an axial air gap and a radial air gap substantially encloses the stationary excitation core. Some permanent magnet-less, brushless synchronous systems include stator core gaps to reduce axial flux flow. Some permanent magnet-less, brushless synchronous systems include an uncluttered rotor coupled to outer laminations. The quadrature-axis inductance may be increased in some synchronous systems. Some synchronous systems convert energy such as mechanical energy into electrical energy (e.g., a generator); other synchronous systems may convert any form of energy into mechanical energy (e.g., a motor).

  10. Reservoir characterization of Mary Lee and Black Creek coals at the Rock Creek field laboratory, Black Warrior basin. Topical report, May-December 1992

    SciTech Connect (OSTI)

    Young, G.B.C.; Paul, G.W.

    1993-08-01T23:59:59.000Z

    A three-dimensional multi-well simulation study was performed for the Rock Creek project site to better understand the relationships between coal reservoir properties, well completion practices, and actual well performance. The reservoir study provided insights on the efficacy of single versus multiple seam completions, the incremental gas recovery resulting from remedial stimulations, and the impact of well spacing on expected long-term gas recovery. The Mary Lee and Black Creek coal groups were characterized by matching production and pressure history for eight Rock Creek producing wells and their surrounding monitor wells. The simulation grid included the Oak Grove mine and degas field located south of the Rock Creek site. Results of well test analyses, corehole-based gas content measurements, and individual coal group gas production from zone isolation packer tests were used to validate the simulation results. Various hydraulic fracture and remedial stimulations were analyzed to compare the effectiveness of different stimulation designs used at the site. Alternative well spacing strategies were examined to assess the effects of interference on long-term gas recovery.

  11. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  12. West Foster Creek Expansion Project 2007 HEP Report.

    SciTech Connect (OSTI)

    Ashley, Paul R.

    2008-02-01T23:59:59.000Z

    During April and May 2007, the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) conducted baseline Habitat Evaluation Procedures (HEP) (USFWS 1980, 1980a) analyses on five parcels collectively designated the West Foster Creek Expansion Project (3,756.48 acres). The purpose of the HEP analyses was to document extant habitat conditions and to determine how many baseline/protection habitat units (HUs) to credit Bonneville Power Administration (BPA) for funding maintenance and enhancement activities on project lands as partial mitigation for habitat losses associated with construction of Grand Coulee and Chief Joseph Dams. HEP evaluation models included mule deer (Odocoileus hemionus), western meadowlark (Sturnella neglecta), sharp-tailed grouse, (Tympanuchus phasianellus), Bobcat (Lynx rufus), mink (Neovison vison), mallard (Anas platyrhynchos), and black-capped chickadee (Parus atricapillus). Combined 2007 baseline HEP results show that 4,946.44 habitat units were generated on 3,756.48 acres (1.32 HUs per acre). HEP results/habitat conditions were generally similar for like cover types at all sites. Unlike crediting of habitat units (HUs) on other WDFW owned lands, Bonneville Power Administration received full credit for HUs generated on these sites.

  13. Postburn core-drilling results from Hoe Creek 3

    SciTech Connect (OSTI)

    Ramirez, A.L.; Ganow, H.C.; Wilder, D.G.

    1981-10-08T23:59:59.000Z

    This paper presents interpretations derived from the analysis of the postburn drilling results from the Hoe Creek 3 experiment. Sixteen partially cored boreholes were drilled using an HQ triple-tube core barrel. The general objectives of this work were to establish the characteristics of the burn cavity and of the materials within and surrounding the cavity. The lateral extent of the burn and the characteristics of the collapsed region overlying the burn cavity were also to be investigated. Important conclusions derived from this study include the following: (1) The horizontally drilled link borehole strongly controlled burn cavity shape and location; no significant combustion occurred below the link; (2) the slag may have acted as an insulation blanket, protecting the coal below the horizontal link borehole; (3) significant roof collapse occurred during the course of the experiment, probably inducing substantial heat losses; (4) the lateral extent of the burn was greatest along the Felix 2 seam; the cavity outline in plan view is shaped like a teardrop; a vertical transverse cross section through the cavity shows a mushroom-shaped outline; (5) roof collapse after the end of the experiment filled much of the space within and above the cavity, producing a mechanically disturbed zone full of voids and weak materials. A zone of fractures or loosened material exists in the remaining (uncollapsed) roof and wall materials, surrounding and paralleling the upper margins of the collapsed region. A void zone was found near the bottom of the collapsed region.

  14. From permanence to total availability: a quantum conceptual upgrade

    E-Print Network [OSTI]

    Massimiliano Sassoli de Bianchi

    2011-06-14T23:59:59.000Z

    We consider the classical concept of time of permanence and observe that its quantum equivalent is described by a bona fide self-adjoint operator. Its interpretation, by means of the spectral theorem, reveals that we have to abandon not only the idea that quantum entities would be characterizable in terms of spatial trajectories but, more generally, that they would possess the very attribute of spatiality. Consequently, a permanence time shouldn't be interpreted as a "time" in quantum mechanics, but as a measure of the total availability of a quantum entity in participating to a process of creation of a spatial localization.

  15. Evaluation of dredged material proposed for ocean disposal from Westchester Creek project area, New York

    SciTech Connect (OSTI)

    Pinza, M.R.; Gardiner, W.W.; Barrows, E.S.; Borde, A.B.

    1996-11-01T23:59:59.000Z

    The objective of the Westchester Creek project was to evaluate proposed dredged material from this area to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Westchester Creek was one of five waterways that the US Army Corps of Engineers- New York District (USACE-NYD) requested the Battelle/Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in May 1995. The evaluation of proposed dredged material from the Westchester Creek project area consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, benthic acute and water-column toxicity tests, and bioaccumulation studies. Thirteen individual sediment core samples were collected from this area and analyzed for grain size, moisture content, and total organic carbon (TOC). One composite sediment sample representing the Westchester Creek area to be dredged, was analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAHs), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended- particulate phase (SPP) of the Westchester Creek sediment composite, was analyzed for metals, pesticides, and PCBS.

  16. Dissolved Oxygen in Allen CreekDissolved Oxygen in Allen Creek Dissolved oxygen (DO) enters the water by diffusion from air, as a by-product of photosynthesis and

    E-Print Network [OSTI]

    Tyler, Christy

    Dissolved Oxygen in Allen CreekDissolved Oxygen in Allen Creek Dissolved oxygen (DO) enters and rapids. There is an inverse relationship between temperature and DO, i.e. colder water holds more oxygen it supplies oxygen to aquatic organisms. Higher DO levels also give the water a better taste. Figure 2. During

  17. Calculation Method of Permanent Magnet Pickups for Electric Guitars

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    in the 1930s, when Rickenbacker fitted out a guitar with a magnet and coils, thus designing the first magnetic to look at the types of magnetic circuit for the guitar pickups. We consider in this paper the most usual1 Calculation Method of Permanent Magnet Pickups for Electric Guitars G. Lemarquand and V

  18. Permanent Closure of the TAN-664 Underground Storage Tank

    SciTech Connect (OSTI)

    Bradley K. Griffith

    2011-12-01T23:59:59.000Z

    This closure package documents the site assessment and permanent closure of the TAN-664 gasoline underground storage tank in accordance with the regulatory requirements established in 40 CFR 280.71, 'Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.'

  19. Permanent laser conditioning of thin film optical materials

    DOE Patents [OSTI]

    Wolfe, C.R.; Kozlowski, M.R.; Campbell, J.H.; Staggs, M.; Rainer, F.

    1995-12-05T23:59:59.000Z

    The invention comprises a method for producing optical thin films with a high laser damage threshold and the resulting thin films. The laser damage threshold of the thin films is permanently increased by irradiating the thin films with a fluence below an unconditioned laser damage threshold. 9 figs.

  20. Ironless Permanent Magnet Motors: Three-Dimensional Analytical Calculation

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    of the magnetic torque exerted between a tile permanent magnet radially magnetized and a winding in ironless structures. Such an expression can be used for calculating the magnetic torque transmitted between the stator or winding dimensions. The ironless structure we consider in this paper is commonly used for high speed

  1. Permanent magnet flowmeter having improved output terminal means

    DOE Patents [OSTI]

    August, Charles (Darien, IL); Myers, Harry J. (Downers Grove, IL)

    1984-01-01T23:59:59.000Z

    Disclosed is an improved permanent magnet flowmeter capable of withstanding bending stresses in the direction of induced emf signals. The flowmeter includes a unique terminal arrangement integrally formed with the flowmeter by trepanning opposing wall sections of the flowmeter body. The terminal arrangement provides increased flowmeter sensitivity by increasing the strength of the induced emf signals.

  2. Permanent magnet with MgB{sub 2} bulk superconductor

    SciTech Connect (OSTI)

    Yamamoto, Akiyasu, E-mail: yamamoto@appchem.t.u-tokyo.ac.jp [The University of Tokyo, 7-3-1 Hongo, Bunkyo, Tokyo 113-8656 (Japan); JST-PRESTO, 4-1-8 Honcho, Kawaguchi, Saitama 332-0012 (Japan); Ishihara, Atsushi; Tomita, Masaru [Railway Technical Research Institute, 2-8-38 Hikari, Kokubunji, Tokyo 185-8540 (Japan); Kishio, Kohji [The University of Tokyo, 7-3-1 Hongo, Bunkyo, Tokyo 113-8656 (Japan)

    2014-07-21T23:59:59.000Z

    Superconductors with persistent zero-resistance currents serve as permanent magnets for high-field applications requiring a strong and stable magnetic field, such as magnetic resonance imaging. The recent global helium shortage has quickened research into high-temperature superconductors (HTSs)—materials that can be used without conventional liquid-helium cooling to 4.2?K. Herein, we demonstrate that 40-K-class metallic HTS magnesium diboride (MgB{sub 2}) makes an excellent permanent bulk magnet, maintaining 3?T at 20?K for 1 week with an extremely high stability (<0.1 ppm/h). The magnetic field trapped in this magnet is uniformly distributed, as for single-crystalline neodymium-iron-boron. Magnetic hysteresis loop of the MgB{sub 2} permanent bulk magnet was determined. Because MgB{sub 2} is a simple-binary-line compound that does not contain rare-earth metals, polycrystalline bulk material can be industrially fabricated at low cost and with high yield to serve as strong magnets that are compatible with conventional compact cryocoolers, making MgB{sub 2} bulks promising for the next generation of Tesla-class permanent-magnet applications.

  3. Permanent laser conditioning of thin film optical materials

    DOE Patents [OSTI]

    Wolfe, C. Robert (Palo Alto, CA); Kozlowski, Mark R. (Pleasanton, CA); Campbell, John H. (Livermore, CA); Staggs, Michael (Tracy, CA); Rainer, Frank (Livermore, CA)

    1995-01-01T23:59:59.000Z

    The invention comprises a method for producing optical thin films with a high laser damage threshold and the resulting thin films. The laser damage threshold of the thin films is permanently increased by irradiating the thin films with a fluence below an unconditioned laser damage threshold.

  4. Permanent Magnet Ecr Plasma Source With Magnetic Field Optimization

    DOE Patents [OSTI]

    Doughty, Frank C. (Plano, TX); Spencer, John E. (Plano, TX)

    2000-12-19T23:59:59.000Z

    In a plasma-producing device, an optimized magnet field for electron cyclotron resonance plasma generation is provided by a shaped pole piece. The shaped pole piece adjusts spacing between the magnet and the resonance zone, creates a convex or concave resonance zone, and decreases stray fields between the resonance zone and the workpiece. For a cylindrical permanent magnet, the pole piece includes a disk adjacent the magnet together with an annular cylindrical sidewall structure axially aligned with the magnet and extending from the base around the permanent magnet. The pole piece directs magnetic field lines into the resonance zone, moving the resonance zone further from the face of the magnet. Additional permanent magnets or magnet arrays may be utilized to control field contours on a local scale. Rather than a permeable material, the sidewall structure may be composed of an annular cylindrical magnetic material having a polarity opposite that of the permanent magnet, creating convex regions in the resonance zone. An annular disk-shaped recurve section at the end of the sidewall structure forms magnetic mirrors keeping the plasma off the pole piece. A recurve section composed of magnetic material having a radial polarity forms convex regions and/or magnetic mirrors within the resonance zone.

  5. SUPER HIGH-SPEED MINIATURIZED PERMANENT MAGNET SYNCHRONOUS MOTOR

    E-Print Network [OSTI]

    Wu, Thomas

    with the design of permanent magnet synchronous motors (PMSM) to operate at super-high speed with high efficiency. The designed and fabricated PMSM was successfully tested to run upto 210,000 rpm The designed PMSM has 2000 W concept of electrical machines. After that, the modeling of PMSM for dynamic simulation is provided

  6. Permanent Magnets Synchronous Machines Faults Detection and Identification

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    for permanent magnet synchronous machines (PMSM). Two main faults occurring on these machines are identified of the PMSM is devel- oped and simulated using Matlab Simulink. The model enables simulating nominal and faulty PMSM behavior, with several stages of degradation, and is supported by tests results. Specific

  7. Parameter estimation of permanent magnet stepper motors without mechanical sensors

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    .1016/j.conengprac.2014.01.015 #12;1. Introduction Permanent Magnet Stepper Motors (PMSM's) are widely used in indus- try for position control, especially in manufacturing applications. PMSM's are more-time adaptation, and fault detection. The estimation of PMSM parameters was studied in (Blauch et al., 1993), 2

  8. Boiling Water at Hot Creek--The Dangerous and Dynamic Thermal Springs in California's Long Valley Caldera

    E-Print Network [OSTI]

    Torgersen, Christian

    ). Conditions in Hot Creek can change very quickly. These fish--caught in a burst of high-temperature water" or intermittently spurting very hot, sediment-laden water as high as 6 feet (2 m) above the stream surface. At timesBoiling Water at Hot Creek--The Dangerous and Dynamic Thermal Springs in California's Long Valley

  9. Simulation of contaminated sediment transport in White Oak Creek basin

    SciTech Connect (OSTI)

    Bao, Y.; Clapp, R.B.; Brenkert, A.L. [Oak Ridge National Lab., TN (United States); Moore, T.D. [Department of Civil and Environmental Engineering, University of Tennessee, Knoxville, TN (United States); Fontaine, T.A. [Department of Civil and Environmental Engineering, South Dakota School of Mines and Technology, Rapid City, SD (United States)

    1995-12-31T23:59:59.000Z

    This paper presents a systematic approach to management of the contaminated sediments in the White Oak Creek watershed at Oak Ridge National Laboratory near Oak Ridge, Tennessee. The primary contaminant of concern is radioactive cesium-137 ({sup 137}Cs), which binds to soil and sediment particles. The key components in the approach include an intensive sampling and monitoring system for flood events; modeling of hydrological processes, sediment transport, and contaminant flux movement; and a decision framework with a detailed human health risk analysis. Emphasis is placed on modeling of watershed rainfall-runoff and contaminated sediment transport during flooding periods using the Hydrologic Simulation Program- Fortran (HSPF) model. Because a large number of parameters are required in HSPF modeling, the major effort in the modeling process is the calibration of model parameters to make simulation results and measured values agree as closely as possible. An optimization model incorporating the concepts of an expert system was developed to improve calibration results and efficiency. Over a five-year simulation period, the simulated flows match the observed values well. Simulated total amount of sediment loads at various locations during storms match with the observed values within a factor of 1.5. Simulated annual releases of {sup 137}Cs off-site locations match the data within a factor of 2 for the five-year period. The comprehensive modeling approach can provide a valuable tool for decision makers to quantitatively analyze sediment erosion, deposition, and transport; exposure risk related to radionuclides in contaminated sediment; and various management strategies.

  10. Salt Creek Canyon, Canyonlands, Utah, May 2010 One week after the fact, at the tail-end of the weekend, I'm sitting down to write

    E-Print Network [OSTI]

    Bardsley, John

    Salt Creek Canyon, Canyonlands, Utah, May 2010 One week after the fact, at the tail the week following UM's graduation, and reserving backcountry camp sites in Canyonlands' Salt Creek Canyon. The itinerary would take us from the south end of Salt Creek Canyon to the Needles' District visitor center

  11. Diagenesis of sandstones from the Douglas Creek member of the Green River Formation (Eocene) at Red Wash field, Uintay County, Utah

    E-Print Network [OSTI]

    Ray, Earl Scott

    1985-01-01T23:59:59.000Z

    , sandstone and some limestone and dolomite beds. The Garden Creek Member at Red Wash Field is about 550 ft (168 m) thick. The Parachute Creek Member, overlying the Garden Creek, is largely oil shale, gray shale, and limestone and dolomite beds...

  12. Biological monitoring of Upper Three Runs Creek, Savannah River Plant, Aiken County, South Carolina

    SciTech Connect (OSTI)

    Specht, W.L.

    1991-10-01T23:59:59.000Z

    In anticipation of the fall 1988 start up of effluent discharges into Upper Three Creek by the F/H Area Effluent Treatment Facility of the Savannah River Site, Aiken, SC, a two and one half year biological study was initiated in June 1987. Upper Three Runs Creek is an intensively studied fourth order stream known for its high species richness. Designed to assess the potential impact of F H area effluent on the creek, the study includes qualitative and quantitative macroinvertebrate stream surveys at five sites, chronic toxicity testing of the effluent, water chemistry and bioaccumulation analysis. This final report presents the results of both pre-operational and post-operational qualitative and quantitative (artificial substrate) macroinvertebrate studies. Six quantitative and three qualitative studies were conducted prior to the initial release of the F/H ETF effluent and five quantitative and two qualitative studies were conducted post-operationally.

  13. Biomonitoring of fish communities, using the index of Biotic Integrity, as an indicator of the success of soil conservation measures in the Rabbit Creek and Middle Creek watersheds, Macon County, North Carolina

    SciTech Connect (OSTI)

    Not Available

    1993-08-01T23:59:59.000Z

    Fish communities in two upper Little Tennessee River tributaries, Rabbit Creek and Middle Creek, both located in Macon County, North Carolina, were monitored using IBI methods in 1990 and again in 1992. A single site, each on the lower reaches of its respective creek, was chosen to reflect the influence of conditions throughout the watershed and to provide a measure of water quality exiting the watershed. The Rabbit Creek watershed (Holly Springs community) has a long history of settlement and agricultural use. Dominant land uses today are pasture in the bottom lands and residential development at higher elevations. Much of the upper portion of the Middle Creek watershed on the slopes of Scaly Mountain is devoted to cabbage farming, often on steep slopes and highly erodible soils. From the cabbage growing area, the creek drops 400 feet to the lower valley. Other common land uses include residential, livestock, and forest. Both streams are characterized by heavy sedimentation and frequent high turbidity. Both streams showed marked improvement between 1990 and 1992. In 1990, Rabbit Creek`s IBI score was 31.0, for a bioclass rating of ``poor.`` In 1992, the IBI score was 42.1 for a bioclass rating of ``fair.`` For Middle Creek, the corresponding figures and ratings are 42.1 (fair) and 54.5 (good). Examination of the data for Rabbit Creek shows a reduction in the proportion of pollution-tolerant species, a higher proportion of specialized insectivores, a higher catch rate (reflecting higher total numbers of fish), and an additional intolerant species. In both cases, the data (supported by visual observation) suggests the causative factor is reduced sedimentation.

  14. Johnson Creek Artificial Propagation and Enhancement Project Operations and Maintenance Program; Brood Year 2000: Johnson Creek Chinook Salmon Supplementation, Biennial Report 2000-2002.

    SciTech Connect (OSTI)

    Daniel, Mitch; Gebhards, John; Hill, Robert

    2003-05-01T23:59:59.000Z

    The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek through artificial propagation. Adult chinook salmon trapping, broodstock selection, and spawning was first implemented in 1998, did not occur in 1999, and was resumed in 2000. A total of 152 salmon were trapped in Johnson Creek in 2000, of which 73 (25 males, 16 females, and 32 jacks) fish were transported to Idaho Fish and Game=s South Fork Salmon River adult holding and spawning facility for artificial propagation purposes. The remaining 79 (29 males, 16 females, and 24 jacks) fish were released above the weir to spawn naturally. A total of 65,060 green eggs were taken from 16 female salmon and transported to the McCall Fish Hatchery for incubation and rearing. Egg counts indicated an average eye-up rate of 86.0% for 55,971 eyed eggs. Average fecundity for Johnson Creek females was 4,066 eggs per female. Juvenile fish were reared indoors at the McCall Fish Hatchery through November 2001. These fish were transferred to outdoor rearing facilities in December 2001 where they remained until release in March 2002. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags. In addition 9,987 were also PIT tagged. Hand counts provided by marking crews were used to amend the number of juvenile salmon released from the original egg count. A total of 57,392 smolts were released into a temporary acclimation channel in Johnson Creek on March 18, 19, 20, 2002. These fish were held in this facility until a fish screen was removed on March 22, 2002 and the fish were allowed to emigrate.

  15. Uranium in the Oatman Creek granite of Central Texas and its economic potential

    E-Print Network [OSTI]

    Conrad, Curtis Paul

    1982-01-01T23:59:59.000Z

    OF SCIENCE December 1982 Major Subject: GEOLOGY URANIUM IN THE OATMAN CREEK GRANITE OF CENTRAL TEXAS AND ITS ECONOMIC POTENTIAL A Thesis by CURTIS PAUL CONRAD Approved as to sty1e and content by; C airman of Committee Member em er ep men December... 1982 ABSTRACT Uranium in the Datman Creek Granite of Central Texas and its Economic Potential . (December 1 982) Curtis Paul Conrad, B. S. , Texas ABN University Chairman of Adv1sory Comm1ttee: Dr. Thomas T. Tieh Recent studies indicate that many...

  16. Steam tracer experiment at the Hoe Creek No. 3 underground coal gasification field test

    SciTech Connect (OSTI)

    Thorsness, C.B.

    1980-11-26T23:59:59.000Z

    Water plays an important role in in-situ coal gasification. To better understand this role, we conducted a steam tracer test during the later stages of the Hoe Creek No. 3 underground coal gasification field test. Deuterium oxide was used as the tracer. This report describes the tracer test and the analysis of the data obtained. The analysis indicates that at Hoe Creek the injected steam interacts with a large volume of water as it passes through the underground system. We hypothesize that this water is undergoing continual reflux in the underground system, resulting in a tracer response typical of a well-stirred tank.

  17. Report on the biological monitoring program for Bear Creek at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, 1989-1994

    SciTech Connect (OSTI)

    Hinzman, R.L. [ed.] [ed.; Beauchamp, J.J.; Cada, G.F.; Peterson, M.J. [and others] [and others

    1996-04-01T23:59:59.000Z

    The Bear Creek Valley watershed drains the area surrounding several closed Oak Ridge Y-12 Plant waste disposal facilities. Past waste disposal practices in the Bear Creek Valley resulted in the contamination of Bear Creek and consequent ecological damage. Ecological monitoring by the Biological Monitoring and Abatement Program (BMAP) was initiated in the Bear Creek watershed in May 1984 and continues at present. Studies conducted during the first year provided a detailed characterization of the benthic invertebrate and fish communities in Bear Creek. The initial characterization was followed by a biological monitoring phase in which studies were conducted at reduced intensities.

  18. Photographs on front cover (clockwise, from upper left): (upper left) Visible mercury at contact between alluvium and slate bedrock, Sailor Flat Mine, Greenhorn Creek drainage, Nevada County, California; total length of ruler is

    E-Print Network [OSTI]

    at contact between alluvium and slate bedrock, Sailor Flat Mine, Greenhorn Creek drainage, Nevada County

  19. Atmospheric Mercury Concentrations Near Salmon Falls Creek Reservoir - Phase 1

    SciTech Connect (OSTI)

    M. L. Abbott

    2005-10-01T23:59:59.000Z

    Elemental and reactive gaseous mercury (EGM/RGM) were measured in ambient air concentrations over a two-week period in July/August 2005 near Salmon Falls Creek Reservoir, a popular fishery located 50 km southwest of Twin Falls, Idaho. A fish consumption advisory for mercury was posted at the reservoir in 2002 by the Idaho Department of Health and Welfare. The air measurements were part of a multi-media (water, sediment, precipitation, air) study initiated by the Idaho Department of Environmental Quality and the U.S. Environmental Protection Agency (EPA) Region 10 to identify potential sources of mercury contamination to the reservoir. The sampling site is located about 150 km northeast of large gold mining operations in Nevada, which are known to emit large amounts of mercury to the atmosphere (est. 2,200 kg/y from EPA 2003 Toxic Release Inventory). The work was co-funded by the Idaho National Laboratory’s Community Assistance Program and has a secondary objective to better understand mercury inputs to the environment near the INL, which lies approximately 230 km to the northeast. Sampling results showed that both EGM and RGM concentrations were significantly elevated (~ 30 – 70%, P<0.05) compared to known regional background concentrations. Elevated short-term RGM concentrations (the primary form that deposits) were likely due to atmospheric oxidation of high EGM concentrations, which suggests that EGM loading from upwind sources could increase Hg deposition in the area. Back-trajectory analyses indicated that elevated EGM and RGM occurred when air parcels came out of north-central and northeastern Nevada. One EGM peak occurred when the air parcels came out of northwestern Utah. Background concentrations occurred when the air was from upwind locations in Idaho (both northwest and northeast). Based on 2003 EPA Toxic Release Inventory data, it is likely that most of the observed peaks were from Nevada gold mine sources. Emissions from known large natural mercury sources in that area cannot account for the observed EGM peaks due to their diffuse source geometry and the large (170 km) transport distance involved. The EGM peak originating from northwestern Utah air may be from three known mercury sources west of Salt Lake City (Kennecott, US Magnesium, Clean Harbors Aragonite) and/or the 1600 MW coal-fired Intermountain Power plant near Delta. However, the relative importance of these short-term peaks for long-term watershed mercury loading (critical factor affecting fish concentrations) is not known, and there is a need to better quantify the annual frequency and magnitude of these different inputs over a longer period of time.

  20. Atmospheric Mercury near Salmon Falls Creek Reservoir in Southern Idaho

    SciTech Connect (OSTI)

    Michael L. Abbott; Jeffrey J. Einerson

    2007-12-01T23:59:59.000Z

    Gaseous elemental mercury (GEM) and reactive gaseous mercury (RGM) were measured over two-week seasonal field campaigns near Salmon Falls Creek Reservoir in south-central Idaho from the summer of 2005 through the fall of 2006 and over the entire summer of 2006 using automated Tekran mercury analyzers. GEM, RGM, and particulate mercury (HgP) were also measured at a secondary site 90 km to the west in southwestern Idaho during the summer of 2006. The study was performed to characterize mercury air concentrations in the southern Idaho area for the first time, estimate mercury dry deposition rates, and investigate the source of observed elevated concentrations. High seasonal variability was observed with the highest GEM (1.91 ± 0.9 ng m-3) and RGM (8.1 ± 5.6 pg m-3) concentrations occurring in the summer and lower values in the winter (1.32 ± 0.3 ng m-3, 3.2 ± 2.9 pg m-3 for GEM, RGM respectively). The summer-average HgP concentrations were generally below detection limit (0.6 ± 1 pg m-3). Seasonally-averaged deposition velocities calculated using a resistance model were 0.034 ± 0.032, 0.043 ± 0.040, 0.00084 ± 0.0017 and 0.00036 ± 0.0011 cm s-1 for GEM (spring, summer, fall, and winter, respectively) and 0.50 ± 0.39, 0.40 ± 0.31, 0.51 ± 0.43 and 0.76 ± 0.57 cm s-1 for RGM. The total annual RGM + GEM dry deposition estimate was calculated to be 11.9 ± 3.3 µg m-2, or about 2/3 of the total (wet + dry) deposition estimate for the area. Periodic elevated short-term GEM (2.2 – 12 ng m-3) and RGM (50 - 150 pg m-3) events were observed primarily during the warm seasons. Back-trajectory modeling and PSCF analysis indicated predominant source directions from the southeast (western Utah, northeastern Nevada) through the southwest (north-central Nevada) with fewer inputs from the northwest (southeastern Oregon and southwestern Idaho).

  1. Grain Refinement of Permanent Mold Cast Copper Base Alloys

    SciTech Connect (OSTI)

    M.Sadayappan; J.P.Thomson; M.Elboujdaini; G.Ping Gu; M. Sahoo

    2005-04-01T23:59:59.000Z

    Grain refinement is a well established process for many cast and wrought alloys. The mechanical properties of various alloys could be enhanced by reducing the grain size. Refinement is also known to improve casting characteristics such as fluidity and hot tearing. Grain refinement of copper-base alloys is not widely used, especially in sand casting process. However, in permanent mold casting of copper alloys it is now common to use grain refinement to counteract the problem of severe hot tearing which also improves the pressure tightness of plumbing components. The mechanism of grain refinement in copper-base alloys is not well understood. The issues to be studied include the effect of minor alloy additions on the microstructure, their interaction with the grain refiner, effect of cooling rate, and loss of grain refinement (fading). In this investigation, efforts were made to explore and understand grain refinement of copper alloys, especially in permanent mold casting conditions.

  2. Hybrid-secondary uncluttered permanent magnet machine and method

    DOE Patents [OSTI]

    Hsu, John S.

    2005-12-20T23:59:59.000Z

    An electric machine (40) has a stator (43), a permanent magnet rotor (38) with permanent magnets (39) and a magnetic coupling uncluttered rotor (46) for inducing a slip energy current in secondary coils (47). A dc flux can be produced in the uncluttered rotor when the secondary coils are fed with dc currents. The magnetic coupling uncluttered rotor (46) has magnetic brushes (A, B, C, D) which couple flux in through the rotor (46) to the secondary coils (47c, 47d) without inducing a current in the rotor (46) and without coupling a stator rotational energy component to the secondary coils (47c, 47d). The machine can be operated as a motor or a generator in multi-phase or single-phase embodiments and is applicable to the hybrid electric vehicle. A method of providing a slip energy controller is also disclosed.

  3. System Cost Analysis for an Interior Permanent Magnet Motor

    SciTech Connect (OSTI)

    Peter Campbell

    2008-08-01T23:59:59.000Z

    The objective of this program is to provide an assessment of the cost structure for an interior permanent magnet ('IPM') motor which is designed to meet the 2010 FreedomCAR specification. The program is to evaluate the range of viable permanent magnet materials for an IPM motor, including sintered and bonded grades of rare earth magnets. The study considers the benefits of key processing steps, alternative magnet shapes and their assembly methods into the rotor (including magnetization), and any mechanical stress or temperature limits. The motor's costs are estimated for an annual production quantity of 200,000 units, and are broken out into such major components as magnetic raw materials, processing and manufacturing. But this is essentially a feasibility study of the motor's electromagnetic design, and is not intended to include mechanical or thermal studies as would be done to work up a selected design for production.

  4. Permanent magnet machine with windings having strand transposition

    DOE Patents [OSTI]

    Qu, Ronghai (Clifton Park, NY); Jansen, Patrick Lee (Scotia, NY)

    2009-04-21T23:59:59.000Z

    This document discusses, among other things, a stator with transposition between the windings or coils. The coils are free from transposition to increase the fill factor of the stator slots. The transposition at the end connections between an inner coil and an outer coil provide transposition to reduce circulating current loss. The increased fill factor reduces further current losses. Such a stator is used in a dual rotor, permanent magnet machine, for example, in a compressor pump, wind turbine gearbox, wind turbine rotor.

  5. Permanent split capacitor single phase electric motor system

    DOE Patents [OSTI]

    Kirschbaum, H.S.

    1984-08-14T23:59:59.000Z

    A permanent split capacitor single phase electric motor achieves balanced operation at more than one operating point by adjusting the voltage supplied to the main and auxiliary windings and adjusting the capacitance in the auxiliary winding circuit. An intermediate voltage tap on an autotransformer supplies voltage to the main winding for low speed operation while a capacitive voltage divider is used to adjust the voltage supplied to the auxiliary winding for low speed operation. 4 figs.

  6. Disc rotors with permanent magnets for brushless dc motor

    SciTech Connect (OSTI)

    Hawsey, R.A.; Bailery, J.M.

    1992-05-26T23:59:59.000Z

    This patent describes a brushless dc permanent magnet motor for driving an autonomous underwater vehicle. It comprises first and second substantially flat, generally cylindrical stators disposed in side by side relation; a first substantially flat, generally cylindrical rotor; a first shaft connected to the first rotor and a second, concentric shaft connected to the second rotor; and means for providing rotation of the first and second shafts in opposite directions.

  7. Spatial and temporal variation in fish assemblage structure at Village Creek

    E-Print Network [OSTI]

    Moriarty, Loren Joan

    1995-01-01T23:59:59.000Z

    . . . . . . . . . . . 50 22. Length frequency distributions mesohabitat and season. of Gambusia affinis by 59 23. Length frequency distributions mesohabitat and season. of Etheostoma vivax by . . 60 24. Length frequency distributions mesohabitat and season... COLLECTED AT VILLAGE CREEK, PRESENTED IN DESCENDING ORDER OF SITE OCCURRENCE. pecies ypnne a venusta Pimephales vigilax Gambusia affinis Fundulus olivaceus Notropis sabinae Notropis texanus Lepomis macrochirus Etheostoma vivax Labidesthes sicculus...

  8. Geology of the Schep-Panther Creek Area, Mason County, Texas

    E-Print Network [OSTI]

    Bryant, George Frank

    1959-01-01T23:59:59.000Z

    Psiat Posh shale asahor QsrSsa Crash liosstoos asahsr salSs eass&t~ osahsr Rilar f~tiaa CJQOR14N SEMI All of the reoogafssd aaEwrs of the Upper Caabrisa fa the L)?ae uplift oro repreeeated is tho Bebop - yuatber Creek ense lUddle ~ a4 Loser...

  9. The Republican, the Platte and Pumpkin Creek: Current Nebraska Water Policy Issues

    E-Print Network [OSTI]

    Nebraska-Lincoln, University of

    1 The Republican, the Platte and Pumpkin Creek: Current Nebraska Water Policy Issues J. David Aiken-appropriated river basins, and has done so in much of the Republican, North Platte, and Central Platte river basins. However, the 1997 Platte River Cooperative Agreement and the 2002 settlement of the RRC litigation have

  10. Final Independent External Peer Review Report Cattaraugus Creek Watershed Ecosystem Restoration

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Final Independent External Peer Review Report Cattaraugus Creek Watershed Ecosystem Restoration of Expertise for Ecosystem Restoration Mississippi Valley Division Contract No. W912HQ-10-D-0002 Task Order Watershed Ecosystem Restoration at Springville Dam, Draft Detailed Project Report/Environmental Assessment

  11. EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

  12. EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

  13. Proceedings of the Conference on Coastal Watersheds:The Caspar Creek Story

    E-Print Network [OSTI]

    Standiford, Richard B.

    Proceedings of the Conference on Coastal Watersheds:The Caspar Creek Story May 6, 1998 Ukiah. 1998. Proceedings of the conference on coastal watersheds: theProceedings of the conference on coastal watersheds: theProceedings of the conference on coastal watersheds: theProceedings of the conference

  14. Storm water control plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1996-04-01T23:59:59.000Z

    This document provides the Environmental Restoration Program with information about the erosion and sediment control, storm water management, maintenance, and reporting and record keeping practices to be employed during Phase II of the remediation project for the Lower East Fork Poplar Creek (LEFPC) Operable Unit.

  15. Influence of the Blue Mesa Reservoir on the Red Creek Landslide, Colorado

    E-Print Network [OSTI]

    Influence of the Blue Mesa Reservoir on the Red Creek Landslide, Colorado SCOTT R. WALKER URS of the Blue Mesa Reservoir submerged approximately 50 percent of the paleolandslide. Some clay layers within of the paleolandslide. Seasonal rapid drawdown of the Blue Mesa Reservoir acts as the trigger for movement, and large

  16. OCEANOGRAPHY Stratigraphic Distribution of Amino Acids in Peats from Cedar Creek

    E-Print Network [OSTI]

    Minnesota, University of

    in Peats from Cedar Creek Bog, Minnesota, and Dismal Swamp, Virginia' F. M. SWAIN, A. BLUMENTALS, AND R the bog waters and waters squeezed from the peats. Attempts to detect proteins in these substances by means of paper electrophoresis were unsuccessful. Fibrous proteins may be present, however. In both peat

  17. Environmental evaluation and restoration plan of the Hoe Creek Underground Coal Gasification Site, Wyoming: Topical report

    SciTech Connect (OSTI)

    Barteaux, W.L.; Berdan, G.L.; Lawrence, J.

    1986-09-01T23:59:59.000Z

    Three underground coal gasification (UCG) experiments were conducted by Lawrence Livermore National Laboratory (LLNL) at the Hoe Creek Site, Wyoming; the Hoe Creek I experiment was conducted in 1976, the Hoe Creek II experiment in 1977, and the Hoe Creek III experiment in 1979. These experiments have had an impact on the land and groundwater quality at the site, and the Department of Energy (DOE) has requested that Western Research Institute (WRI) develop and implement a site restoration plan. The purpose of the plan is to restore the site to conditions being negotiated with the Wyoming Department of Environmental Quality (WDEQ). To prepare for developing a plan, WRI compiled background information on the site. The geologic and hydrologic characteristics of the site were determined, and the water quality data were analyzed. Modelling the site was considered and possible restoration methods were examined. Samples were collected and laboratory tests were conducted. WRI then developed and began implementing a field-scale restoration test. 41 refs, 46 figs., 13 tabs.

  18. Groundwater restoration field test at the Hoe Creek underground coal gasification site

    SciTech Connect (OSTI)

    Nordin, J.S.; Barrash, W.; Nolan, B.T.

    1988-02-01T23:59:59.000Z

    Three underground coal gasification burns were conducted at the Hoe Creek Site in the Powder River Basin. Some contaminants were released in the groundwater. The Department of Energy (DOE) analyzed the water from a network of wells. Two million gallons of groundwater were pumped from wells adjacent to the Hoe Creek II underground coal gasification cavity, passed through filters and carbon adsorbers, and reinjected into the cavity. Phenol was the target compound of the water treatment system. The phenol concentration pumped from well WS-10 decreased from 974 parts per billion (ppB) when treatment began on July 2, 1987, to about 200 ppB when treatment ceased on August 29, 1987. Phenol concentrations pumped from well WS-22 fluctuated during the tests, but they decreased to the 150 to 200 ppB range by the time treatment was terminated. The phenol concentration of treated water reinjected into the Hoe Creek II cavity was below detectable limits (less than 20 ppB). Pumping rates were about 18 gallons per minute (gpm) from well WS-10 and 6 to 8 gpm from well WS-22. Hoe Creek is located approximately 20 miles southwest of Gillette, Wyoming. 12 refs., 5 figs., 8 tabs.

  19. Seneca Creek Associates, LLC Wood Resources International, LLC "Illegal" Logging and Global Wood Markets

    E-Print Network [OSTI]

    Seneca Creek Associates, LLC Wood Resources International, LLC "Illegal" Logging and Global Wood@aol.com; hekstrom@wri-ltd.com October, 2004 #12;Page ES - 1 Illegal Logging and Global Wood Markets: The Competitive, LLC Executive Summary Illegal logging has been high on the agenda, if not directly at the center

  20. Seneca Creek Associates, LLC Wood Resources International, LLC "Illegal" Logging and Global Wood Markets

    E-Print Network [OSTI]

    Seneca Creek Associates, LLC Wood Resources International, LLC SUMMARY "Illegal" Logging and Global Resources International, LLC Illegal Logging and Global Wood Markets: The Competitive Impacts on the U.S. Wood Products Industry1 Summary Study Objectives Illegal logging and illegal forest activities, in one

  1. High-Energy Composite Permanent Magnets: High-Energy Permanent Magnets for Hybrid Vehicles and Alternative Energy

    SciTech Connect (OSTI)

    None

    2010-02-15T23:59:59.000Z

    Broad Funding Opportunity Announcement Project: The University of Delaware is developing permanent magnets that contain less rare earth material and produce twice the energy of the strongest rare earth magnets currently available. The University of Delaware is creating these magnets by mixing existing permanent magnet materials with those that are more abundant, like iron. Both materials are first prepared in the form of nanoparticles via techniques ranging from wet chemistry to ball milling. After that, the nanoparticles must be assembled in a 3-D array and consolidated at low temperatures to form a magnet. With small size particles and good contact between these two materials, the best qualities of each allow for the development of exceptionally strong composite magnets.

  2. Development and chemical quality of a ground-water system in cast overburden as the Gibbons Creek Lignite Mine

    E-Print Network [OSTI]

    Borbely, Evelyn Susanna

    1988-01-01T23:59:59.000Z

    -water conditions which develop in response to surface mining. TMPA has supported research at the Gibbons Creek Lignite Mine in order to meet the needs of mine develop- ment and permitting, Most of the data on ground-water conditions 1n reclaimed spoil has been... on the west by the Navasota River, on the south by Gibbons Creek, and on the north by State Highway 30 (Figure 1). This area includes the Gibbons Creek Steam Electric Station. Lignite is extracted from two pits within the permit boundary, termed the A...

  3. Method for forming permanent magnets with different polarities for use in microelectromechanical devices

    DOE Patents [OSTI]

    Roesler, Alexander W. (Tijeras, NM); Christenson, Todd R. (Albuquerque, NM)

    2007-04-24T23:59:59.000Z

    Methods are provided for forming a plurality of permanent magnets with two different north-south magnetic pole alignments for use in microelectromechanical (MEM) devices. These methods are based on initially magnetizing the permanent magnets all in the same direction, and then utilizing a combination of heating and a magnetic field to switch the polarity of a portion of the permanent magnets while not switching the remaining permanent magnets. The permanent magnets, in some instances, can all have the same rare-earth composition (e.g. NdFeB) or can be formed of two different rare-earth materials (e.g. NdFeB and SmCo). The methods can be used to form a plurality of permanent magnets side-by-side on or within a substrate with an alternating polarity, or to form a two-dimensional array of permanent magnets in which the polarity of every other row of the array is alternated.

  4. Natural Propagation and Habitat Improvement, Volume 2, Idaho, 1984 Final and Annual Reports.

    SciTech Connect (OSTI)

    Hair, Don

    1986-01-01T23:59:59.000Z

    In 1984, and under the auspices of the Northwest Power Planning Council, the Clear-water National Forest and the Bonneville Power Administration entered into a contractual agreement to improve anadromous fish habitat in Lolo Creek. This was to be the second and final year of instream enhancement work in Lolo Creek, a major tributary to the Clearwater River. The project was again entitled Lolo Creek Habitat Improvement (No.84-6) which was scheduled from April 1, 1984, through March 31, 1985. Project costs were not to exceed $39,109. The following report is a description of the project objectives, methodology, results, and conclusions of this year's work, based on the knowledge and experience gained through 2 years of enhancement work. The primary objective was to partially mitigate the juvenile and adult anadromous fish losses accrued through hydroelectric development in the Columbia and Snake River systems by enhancing the spawning and rearing habitats of selected Clearwater River tributaries for spring chinook salmon and summer steelhead trout. The enhancement was designed to ameliorate the ''limiting production factors'' by the in-stream placement of habitat structures that would positively alter the pool-riffle structure and increase the quality of over-winter habitat.

  5. Abstract At the time of this study Fossil Creek was being considered as a site for the restoration

    E-Print Network [OSTI]

    . This study was conducted prior to a hydroelectric dam decommissioning project in Fossil Creek where full limitation Ã? Phosphorous Ã? Nitrogen Ã? Invertebrate Ã? Dam Ã? Hydroelectric Ã? Native fish Ã? Food base

  6. ARCHAEOLOGY, LATE-QUATERNARY LANDSCAPE EVOLUTION, AND ENVIRONMENTAL CHANGE IN THE UPPER DRIFTWOOD CREEK BASIN, BARBER COUNTY, KANSAS

    E-Print Network [OSTI]

    Kessler, Nicholas Victor

    2010-12-09T23:59:59.000Z

    This study focused on valley fills in the upper Driftwood Creek basin, a 3rd order drainage network in south-central Kansas to determine the geologic potential for stratified cultural material and to reconstruct a record of Late...

  7. Lateral Continuity of the Eagle Ford Group Strata in Lozier Canyon and Antonio Creek, Terrell County, Texas

    E-Print Network [OSTI]

    Gardner, Rand D

    2013-09-24T23:59:59.000Z

    simplistic assumptions about relevant horizontal reservoir heterogeneities can lead to sub-optimal or uneconomical exploitation. High-resolution correlation of individual beds in the Eagle Ford Group over several miles in Lozier Canyon and Antonio Creek...

  8. Spring Creek Project for Ideas, Nature, and the Written Word Call for Nominations: Graduate Student Research and Writing Retreat

    E-Print Network [OSTI]

    Grünwald, Niklaus J.

    Spring Creek Project for Ideas, Nature, and the Written Word Call for Nominations: Graduate Student on a collaborative project or two graduate students who each have individual projects are invited to nominate graduate students in the humanities or environmental sciences

  9. Saeltzer Dam Removal on Clear Creek 11 years later: An assessment of upstream channel changes since the dam's removal

    E-Print Network [OSTI]

    Simons, Crystal; Walker, Katelyn; Zimring, Mark

    2011-01-01T23:59:59.000Z

    Boulder BLDR Bedrock BDRK Dam Rubble DMRB Table B1. 2011pages. Brown, M. (n.d. ). Clear Creek—McCormick-Saeltzer DamRemoval: Dam removal re-opens spring run salmon habitat. US

  10. MESOHABITAT USE AND COMMUNITY STRUCTURE OF BRAZOS RIVER FISHES IN THE VICINITY OF THE PROPOSED ALLENS CREEK RESERVOIR 

    E-Print Network [OSTI]

    Gelwick, Frances P.; Li, Raymond Y.

    2003-01-01T23:59:59.000Z

    MESOHABITAT USE AND COMMUNITY STRUCTURE OF BRAZOS RIVER FISHES IN THE VICINITY OF THE PROPOSED ALLENS CREEK RESERVOIR Submitted to: Texas Water Development Board P.O. Box 13231, Capitol Station 1700 N. Congress Avenue Austin...

  11. Water quality and chemistry of an alpine stream: a case study of Sneffels Creek, Yankee Boy Basin, Colorado

    E-Print Network [OSTI]

    Heggie, Tracey Michelle

    2002-01-01T23:59:59.000Z

    reduction potential (orp) were measured at forty-one study sites along Sneffels Creek. Temperature, tds, conductivity, and orp are positively correlated and show an inverse relationship with elevation and channel width. Turbidity is highly variable along...

  12. LLL in situ coal gasification project. Quarterly progress report, October-December 1979. [Hoe Creek No. 3 and planning

    SciTech Connect (OSTI)

    Cena, R.J.; Strack, B.S. (eds.)

    1980-04-23T23:59:59.000Z

    The major effort this quarter has been postexperiment analysis of Hoe Creek No. 3 and planning for future gasification experiments. Hoe Creek No. 3: Thermal data have been analyzed to determine the performance of the drilled horizontal channel during forward gasification. Thermal and material balance data are combined to determine late-time burn boundaries for the experiment. Surface subsidence after the experiment was completed is described. Process wells were inspected to determine failure characteristics and pinpoint late-time injection location. Ground-water quality before and after Hoe Creek No. 3 and the effects of aquifer interconnection on hydraulic measurements at the Hoe Creek No. 2 and No. 3 sites are discussed. Future experiments: Potential UCG sites are being characterized for future tests. Two sites in the Powder River Basin near Gillette, Wyoming are discussed. Preliminary plans for a deep site gasification experiment and a new method for in situ gasification of thick seams are presented.

  13. A mesoscopic network model for permanent set in crosslinked elastomers

    SciTech Connect (OSTI)

    Weisgraber, T H; Gee, R H; Maiti, A; Clague, D S; Chinn, S; Maxwell, R S

    2009-01-29T23:59:59.000Z

    A mesoscopic computational model for polymer networks and composites is developed as a coarse-grained representation of the composite microstructure. Unlike more complex molecular dynamics simulations, the model only considers the effects of crosslinks on mechanical behavior. The elastic modulus, which depends only on the crosslink density and parameters in the bond potential, is consistent with rubber elasticity theory, and the network response satisfies the independent network hypothesis of Tobolsky. The model, when applied to a commercial filled silicone elastomer, quantitatively reproduces the experimental permanent set and stress-strain response due to changes in the crosslinked network from irradiation.

  14. A clip-on Zeeman slower using toroidal permanent magnets

    SciTech Connect (OSTI)

    Krzyzewski, S. P.; Akin, T. G.; Dahal, Parshuram; Abraham, E. R. I. [Homer L. Dodge Department of Physics and Astronomy, University of Oklahoma, Norman, Oklahoma 73019 (United States)

    2014-10-15T23:59:59.000Z

    We present the design of a zero-crossing Zeeman slower for {sup 85}Rb using rings of flexible permanent magnets. The design is inexpensive, requires no power or cooling, and can be easily attached and removed for vacuum maintenance. We show theoretically that such a design can reproduce a magnetic field profile of a standard zero-crossing Zeeman slower. Experimental measurements of a prototype and comparisons to theoretical simulations demonstrate the feasibility of the design and point toward future improvements. Simulations show an atom flux similar to other Zeeman slowers.

  15. Archaeological investigations at the Kent Creek site (41HL66): evidence of Mogollon influence on the Southern Plains

    E-Print Network [OSTI]

    Cruse, Jimmy Brett

    1989-01-01T23:59:59.000Z

    in Hall County, Texas. . . . . 4 2. Contour map of the Kent Creek site. 3. Relief map of the Llano Estacado and surrounding areas. . . , 10 4. Cultural chronology chart of the Southern Plains and eastern New Mexico. 19 5. Map of the Llano Estacado... ideas about houses and horticulture. Evidence which may support Hughes' suggestion comes from archaeological excavations recently conducted at the Kent Creek site (41HL66) located in Hall County of the southeastern Texas panhandle (Figure 1...

  16. Hepatics of the Turkey Creek Unit of the Big Thicket National Preserve: a floristic and ecological study

    E-Print Network [OSTI]

    Bazan, Evangelina

    1980-01-01T23:59:59.000Z

    Botanically, The Turkey Creek Unit is of particular interest be- cause it includes 10 distinct vascular plant associations, according to a recent vegetation analysis of the Big Thicket National Preserve by Harcombe and Marks (1979). The unit was selected... in the Turkey Creek Unit of the Big Thicket National Preserve with approximate acreage and corres- ponding percent area occuppied. Asterisks indicate associations not sampled. (After Harcombe & Marks, 1979. ) Association Acreage Percent * Upland pine (UP...

  17. Pond Creek coal seam in eastern Kentucky - new look at an old resource

    SciTech Connect (OSTI)

    Hower, J.C.; Pollock, J.D.; Klapheke, J.G.

    1986-05-01T23:59:59.000Z

    The Middle Pennsylvania/Westphalian B Pond Creek Coal is an important low-sulfur resource in Pike and Martin Counties, Kentucky. The Breathitt Formation seam, also known as the lower Elkhorn coal, accounted for nearly 40% of Pike County's 1983 production of 22 million tons. Although the coal is nearly mined out through central Pike County, substantial reserves still exist in the northern part of the county. Past studies of the seam by the US Bureau of Mines concentrated on the utility of the seam as a coking blend, with additional consideration of the megascopic and microscopic coal petrology. The authors research has focused on the regional variations in the Pond Creek seam, with emphasis on the petrographic variations.

  18. Reintroduction of Lower Columbia River Chum Salmon into Duncan Creek, 2007 Annual Report.

    SciTech Connect (OSTI)

    Hillson, Todd D. [Washington Department of Fish and Wildlife

    2009-06-12T23:59:59.000Z

    The National Marine Fisheries Service (NMFS) listed Lower Columbia River (LCR) chum salmon as threatened under the Endangered Species Act (ESA) in March, 1999 (64 FR 14508, March 25, 1999). The listing was in response to the reduction in abundance from historical levels of more than one-half million returning adults to fewer than 10,000 present-day spawners. Harvest, habitat degradation, changes in flow regimes, riverbed movement and heavy siltation have been largely responsible for this decline. The timing of seasonal changes in river flow and water temperatures is perhaps the most critical factor in structuring the freshwater life history of this species. This is especially true of the population located directly below Bonneville Dam, where hydropower operations can block access to spawning sites, dewater redds, strand fry, cause scour or fill of redds and increase sedimentation of spawning gravels. Prior to 1997, only two chum salmon populations were recognized as genetically distinct in the Columbia River, although spawning had been documented in many Lower Columbia River tributaries. The first population was in the Grays River (RKm 34), a tributary of the Columbia River, and the second was a group of spawners utilizing the mainstem Columbia River just below Bonneville Dam (RKm 235) adjacent to Ives Island and in Hardy and Hamilton creeks. Using additional DNA samples, Small et al. (2006) grouped chum salmon spawning in the mainstem Columbia River and the Washington State tributaries into three groups: the Coastal, the Cascade and the Gorge. The Coastal group comprises those spawning in the Grays River, Skamokawa Creek and the broodstock used at the Sea Resources facility on the Chinook River. The Cascade group comprises those spawning in the Cowlitz (both summer and fall stocks), Kalama, Lewis, and East Fork Lewis rivers, with most supporting unique populations. The Gorge group comprises those spawning in the mainstem Columbia River from the I-205 Bridge up to Bonneville Dam and those spawning in Hamilton and Hardy creeks. Response to the federal ESA listing has been primarily through direct-recovery actions: reducing harvest, hatchery supplementation using local broodstock for populations at catastrophic risk, habitat restoration (including construction of spawning channels) and flow agreements to protect spawning and rearing areas. Both state and federal agencies have built controlled spawning areas. In 1998, the Washington Department of Fish and Wildlife (WDFW) began a chum salmon supplementation program using native stock on the Grays River. This program was expanded during 1999 - 2001 to include reintroduction into the Chinook River using eggs from the Grays River Supplementation Program. These eggs are incubated at the Grays River Hatchery, reared to release size at the Sea Resources Hatchery on the Chinook River, and the fry are released at the mouth of the Chinook River. Native steelhead, chum, and coho salmon are present in Duncan Creek, and are recognized as subpopulations of the Lower Gorge population, and are focal species in the Lower Columbia Fish Recovery Board (LCFRB) plan. Steelhead, chum and coho salmon that spawn in Duncan Creek are listed as Threatened under the ESA. Duncan Creek is classified by the LCFRB plan as a watershed for intensive monitoring (LCFRB 2004). This project was identified in the 2004 Federal Columbia River Power System (FCRPS) revised Biological Opinion (revised BiOp) to increase survival of chum salmon, 'BPA will continue to fund the program to re-introduce Columbia River chum salmon into Duncan Creek as long as NOAA Fisheries determines it to be an essential and effective contribution to reducing the risk of extinction for this ESU'. (USACE et al. 2004, page 85-86). The Governors Forum on Monitoring and Salmon Recovery and Watershed Health recommends one major population from each ESU have adult and juvenile monitoring. Duncan Creek chum salmon are identified in this plan to be intensively monitored. Planners recommended that a combination of natural and hatchery production

  19. The Hanna and Hoe Creek underground coal gasification test sites: Status report, (June 1986-June 1987)

    SciTech Connect (OSTI)

    Berdan, G.L.; Nolan, B.T.; Barteaux, W.L.; Barrash, W.

    1987-06-01T23:59:59.000Z

    To comply with a cooperative agreement with the U.S. Department of Energy (DOE), the Western Research Institute (WRI) is required to submit an annual report summarizing the status of environmentally related work performed by WRI at the Hanna and Hoe Creek underground coal gasification (UCG) sites. The following is a summary of work performed at these two sites from June 1986 to June 1987. Several tasks for restoring the water quailty at Hoe Creek were: (1) groundwater treatment demonstration (1986); (2) bench-scale carbon adsorption experiments (1987); (3) design of the scaled-up treatment system (1987); (4) well-pumping test (1987). A summary of the results of each task is presented. 6 refs., 8 figs., 4 tabs.

  20. Geology of the Bee Branch-Mill Creek area, Mason County, Texas 

    E-Print Network [OSTI]

    Miller, George Howard

    1957-01-01T23:59:59.000Z

    . andstcns member. ?organ Creek lmesrcne res?er . Pomrt Ie rn shale m, . mber . Bio? '", . one ct' th . "oint Peck . hale '&au Saba limestcno member . Ordoeician sy;tem . 12 13 14 15 15 16 16 17 19 Ellen? urger group. Mississippian system..., Chappel '"creation. Barnet t shale. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 4 ~ ~ 25 26 Pennsylvanian system. ~ ~ ~ ~ ~ ~ 28 N*rble Falls group 'I ~ ~ ~ ~ ~ ~ ~ ~ ~ &mithsick 'c rr, . * Lic n. \\ ~ Cretaceous system . Quaternarr sy ten...

  1. Campbell Creek TVA 2010 First Year Performance Report July 1, 2009 August 31, 2010

    SciTech Connect (OSTI)

    Christian, Jeffrey E [ORNL; Gehl, Anthony C [ORNL; Boudreaux, Philip R [ORNL; New, Joshua Ryan [ORNL

    2010-10-01T23:59:59.000Z

    This research project was initiated by TVA in March 2008 and encompasses three houses that are of similar size, design and located within the same community - Campbell Creek, Farragut TN with simulated occupancy. This report covers the performance period from July 1, 2009 to August 31, 2010. It is the intent of TVA that this Valley Data will inform electric utilities future residential retrofit incentive program.

  2. Contribution of valley-side erosion to sedimentation problems in Wolf Pen Creek, College Station, Texas

    E-Print Network [OSTI]

    Wilson, Rachel Suzanne

    2000-01-01T23:59:59.000Z

    exist all along the Gulf Coast and in many other regions of the country. Therefore, the problems associated with Wolf Pen Creek are extremely important and are of national significance. Time and time again, the geology is neglected in urban river... hardwoods can be found along the Navasota River lowland. An open stand of postjack oaks (guercus stellata) and blackjack oaks (Quercus rnarilandica) and a ground cover of tall grasses characterize the post-oak savannah. 16 The Lufkin, Edge, and Tabor...

  3. Environmental assessment for the Hoe Creek underground, Coal Gasification Test Site Remediation, Campbell County, Wyoming

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) has prepared this EA to assess environmental and human health Issues and to determine potential impacts associated with the proposed Hoe Creek Underground Coal Gasification Test Site Remediation that would be performed at the Hoe Creek site in Campbell County, Wyoming. The Hoe Creek site is located south-southwest of the town of Gillette, Wyoming, and encompasses 71 acres of public land under the stewardship of the Bureau of Land Management. The proposed action identified in the EA is for the DOE to perform air sparging with bioremediation at the Hoe Creek site to remove contaminants resulting from underground coal gasification (UCG) experiments performed there by the DOE in the late 1970s. The proposed action would involve drilling additional wells at two of the UCG test sites to apply oxygen or hydrogen peroxide to the subsurface to volatilize benzene dissolved in the groundwater and enhance bioremediation of non-aqueous phase liquids present in the subsurface. Other alternatives considered are site excavation to remove contaminants, continuation of the annual pump and treat actions that have been used at the site over the last ten years to limit contaminant migration, and the no action alternative. Issues examined in detail in the EA are air quality, geology, human health and safety, noise, soils, solid and hazardous waste, threatened and endangered species, vegetation, water resources, and wildlife. Details of mitigative measures that could be used to limit any detrimental effects resulting from the proposed action or any of the alternatives are discussed, and information on anticipated effects identified by other government agencies is provided.

  4. Permanent Magnet Assisted Synchronous Reluctance Machine (PMa-SynRM) Design and Performance Analysis for Fan and Pump Applications

    E-Print Network [OSTI]

    Vartanian, Robert

    2014-08-13T23:59:59.000Z

    -5: Different synchronous machines: (a) Permanent Magnet Synchronous Machine (PMSM), (b) Interior Permanent Magnet (IPM), (c) Synchronous Reluctance Machine (SynRM), (d) Axially Laminated Synchronous Reluctance Machine, (e) Permanent Magnet assisted Syn... and assembling the laminations on the shaft axially[11, 20-22]. 6 (a) (b) (c) (d) (e) Fig 1-5: Different synchronous machines: (a) Permanent Magnet Synchronous Machine (PMSM), (b) Interior Permanent Magnet (IPM), (c) Synchronous...

  5. Habitat Projects Completed within the Asotin Creek Watershed, 1999 Completion Report.

    SciTech Connect (OSTI)

    Johnson, Bradley J.

    2000-01-01T23:59:59.000Z

    The Asotin Creek Model Watershed Program (ACMWP) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The Asotin Creek watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in WRIA 35. According to WDFW's Priority WRIA's by At-Risk Stock Significance Map, it is the highest priority in southeastern WA. Snake River spring chinook salmon, summer steelhead and bull trout, which are listed under the Endangered Species Act (ESA), are present in the watershed. The ACMWP began coordinating habitat projects in 1995. Approximately two hundred seventy-six projects have been implemented through the ACMWP as of 1999. Twenty of these projects were funded in part through Bonneville Power Administration's 1999 Columbia Basin Fish and Wildlife Program. These projects used a variety of methods to enhance and protect watershed conditions. In-stream work for fish habitat included construction of hard structures (e.g. vortex rock weirs), meander reconstruction, placement of large woody debris (LWD) and whole trees and improvements to off-channel rearing habitat; thirty-eight were created with these structures. Three miles of stream benefited from riparian improvements such as vegetative plantings (17,000 trees and shrubs) and noxious weed control. Two sediment basin constructions, 67 acres of grass seeding, and seven hundred forty-five acres of minimum till were implemented to reduce sediment production and delivery to streams in the watershed.

  6. Evaluation of dredged material proposed for ocean Disposal from Shoal Harbor/Compton Creek Project Area

    SciTech Connect (OSTI)

    Gardiner, W.W.; Borde, A.B.; Nieukirk, S.L.; Barrows, E.S.; Gruendell, B.D.; Word, J.Q.

    1996-10-01T23:59:59.000Z

    The objective of the Shoal Harbor/Compton Creek Project was to evaluate proposed dredged material from the Shoal harbor/Compton Creek Project Area in Belford and Monmouth, New Jersey to determine its suitability for unconfined ocean disposal at the Mud Dump Site. This was one of five waterways that the US Army Corps of Engineers- New York District requested the Battelle Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in May 1995. The evaluation of proposed dredged material from the Shoal Harbor/Compton Creek Project area consisted of bulk chemical analyses, chemical analyses of dredging site water and elutriate, benthic and water-column acute toxicity tests and bioaccumulation studies. Eleven core samples were analyzed or grain size, moisture content, and total organic carbon. Other sediments were evaluated for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congers, polynuclear aromatic hydrocarbons, and 1,4- dichlorobenzene. Dredging site water and elutriate water were analyzed for metals, pesticides, and PCBs.

  7. Reservoir heterogeneity in Carter Sandstone, North Blowhorn Creek oil unit and vicinity, Black Warrior Basin, Alabama

    SciTech Connect (OSTI)

    Kugler, R.L.; Pashin, J.C.

    1992-05-01T23:59:59.000Z

    This report presents accomplishments made in completing Task 3 of this project which involves development of criteria for recognizing reservoir heterogeneity in the Black Warrior basin. The report focuses on characterization of the Upper Mississippian Carter sandstone reservoir in North Blowhorn Creek and adjacent oil units in Lamar County, Alabama. This oil unit has produced more than 60 percent of total oil extracted from the Black Warrior basin of Alabama. The Carter sandstone in North Blowhorn Creek oil unit is typical of the most productive Carter oil reservoirs in the Black Warrior basin of Alabama. The first part of the report synthesizes data derived from geophysical well logs and cores from North Blowhorn Creek oil unit to develop a depositional model for the Carter sandstone reservoir. The second part of the report describes the detrital and diagenetic character of Carter sandstone utilizing data from petrographic and scanning electron microscopes and the electron microprobe. The third part synthesizes porosity and pore-throat-size-distribution data determined by high-pressure mercury porosimetry and commercial core analyses with results of the sedimentologic and petrographic studies. The final section of the report discusses reservoir heterogeneity within the context of the five-fold classification of Moore and Kugler (1990).

  8. Hoe Creek experiments: LLNL's underground coal-gasification project in Wyoming

    SciTech Connect (OSTI)

    Stephens, D.R.

    1981-10-01T23:59:59.000Z

    Under the sponsorship of the US Department of Energy and predecessor organizations, the Lawrence Livermore National Laboratory carried out a laboratory program and three field, underground coal gasification tests near Gillette, Wyoming. This report summarizes that work. Three methods of linking or connecting injection and production wells were used for the UCG field tests: Hoe Creek No. 1 employed explosive fracturing, Hoe Creek No. 2 featured use of reverse combustion, and directional drilling was used for the Hoe Creek No. 3. The Gas Research Institute cosponsored the latter test. Laboratory experiments and modeling, together with a laboratory and field environment program, are necessary adjuncts to the field program. Explosive fracturing in coal was simulated using computer models and laboratory tests. We developed a relationship of total inelastic strains to permeability, which we used to design and interpret a coal outcrop, explosive fracturing experiment at Kemmerer, Wyoming. Coal gasification was also simulated in laboratory experiments and with computer models. The primary aim has been to predict and correlate reaction, thermal-front propagation rates, and product gas composition as a function of bed properties and process operating conditions. Energy recovery in the form of produced gas and liquids amounted to 73% of the energy in the consumed coal. There were essentially no losses to the subsurface formation. The greatest energy loss was in steam production.

  9. Rectangular Scott-type Permanents Guo-Niu Han et Christian Krattenthaler

    E-Print Network [OSTI]

    Krattenthaler, Christian

    -type" permanent, the case of P(x) = xn - 1 and Q(y) = yn + 1 having been considered by R. F. Scott. We present of Scott-type permanents for special choices of the polynomials P(x) and Q(y), including generalizations that if P(x) = xn - 1 and Q(y) = y2n + yn + 1 then the corresponding Scott-type permanent is equal to (-1)n

  10. Rectangular Scott-type Permanents Guo-Niu Han et Christian Krattenthaler

    E-Print Network [OSTI]

    Krattenthaler, Christian

    is the permanent per(1=(xi-yj))1 i n, 1 j m, here named "Scott-type" permanent, the case of P (x) = xn - 1 and Q evaluations of Scott-type permanents for special choices of the polynomials P (x) and Q(* *y type Scott. Le cas de P (x) = xn - 1 et Q(y) = yn + 1 a 'et'e consid'er'e* * par R. F. Scott. Nous

  11. Vehicle Technologies Office Merit Review 2014: Permanent Magnet Development for Automotive Traction Motors

    Broader source: Energy.gov [DOE]

    Presentation given by Ames Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about permanent magnet development...

  12. Innovative Sensors for Pipeline Crawlers: Rotating Permanent Magnet Inspection

    SciTech Connect (OSTI)

    J. Bruce Nestleroth; Richard J. Davis; Stephanie Flamberg

    2006-09-30T23:59:59.000Z

    Internal inspection of pipelines is an important tool for ensuring safe and reliable delivery of fossil energy products. Current inspection systems that are propelled through the pipeline by the product flow cannot be used to inspect all pipelines because of the various physical barriers they may encounter. To facilitate inspection of these ''unpiggable'' pipelines, recent inspection development efforts have focused on a new generation of powered inspection platforms that are able to crawl slowly inside a pipeline and can maneuver past the physical barriers that limit internal inspection applicability, such as bore restrictions, low product flow rate, and low pressure. The first step in this research was to review existing inspection technologies for applicability and compatibility with crawler systems. Most existing inspection technologies, including magnetic flux leakage and ultrasonic methods, had significant implementation limitations including mass, physical size, inspection energy coupling requirements and technology maturity. The remote field technique was the most promising but power consumption was high and anomaly signals were low requiring sensitive detectors and electronics. After reviewing each inspection technology, it was decided to investigate the potential for a new inspection method. The new inspection method takes advantage of advances in permanent magnet strength, along with their wide availability and low cost. Called rotating permanent magnet inspection (RPMI), this patent pending technology employs pairs of permanent magnets rotating around the central axis of a cylinder to induce high current densities in the material under inspection. Anomalies and wall thickness variations are detected with an array of sensors that measure local changes in the magnetic field produced by the induced current flowing in the material. This inspection method is an alternative to the common concentric coil remote field technique that induces low-frequency eddy currents in ferromagnetic pipes and tubes. Since this is a new inspection method, both theory and experiment were used to determine fundamental capabilities and limitations. Fundamental finite element modeling analysis and experimental investigations performed during this development have led to the derivation of a first order analytical equation for designing rotating magnetizers to induce current and positioning sensors to record signals from anomalies. Experimental results confirm the analytical equation and the finite element calculations provide a firm basis for the design of RPMI systems. Experimental results have shown that metal loss anomalies and wall thickness variations can be detected with an array of sensors that measure local changes in the magnetic field produced by the induced current flowing in the material. The design exploits the phenomenon that circumferential currents are easily detectable at distances well away from the magnets. Current changes at anomalies were detectable with commercial low cost Hall Effect sensors. Commercial analog to digital converters can be used to measure the sensor output and data analysis can be performed in real time using PC computer systems. The technology was successfully demonstrated during two blind benchmark tests where numerous metal loss defects were detected. For this inspection technology, the detection threshold is a function of wall thickness and corrosion depth. For thinner materials, the detection threshold was experimentally shown to be comparable to magnetic flux leakage. For wall thicknesses greater than three tenths of an inch, the detection threshold increases with wall thickness. The potential for metal loss anomaly sizing was demonstrated in the second benchmarking study, again with accuracy comparable to existing magnetic flux leakage technologies. The rotating permanent magnet system has the potential for inspecting unpiggable pipelines since the magnetizer configurations can be sufficiently small with respect to the bore of the pipe to pass obstructions that limit the application of many i

  13. Magnetic Patterning of Permanent-Magnet Rotors for Microscale Motor/Generators

    E-Print Network [OSTI]

    Magnetic Patterning of Permanent-Magnet Rotors for Microscale Motor/Generators I. Zana* , F, USA Abstract We present and characterize a process to pattern magnetic poles on small permanent-magnet, this approach uses a ferromagnetic magnetizing head (MH) and an externally applied magnetic field, and it offers

  14. Magnetic Field Created by Tile Permanent R. Ravaud, G. Lemarquand, V. Lemarquand

    E-Print Network [OSTI]

    Boyer, Edmond

    , the most common shape for a permanent magnet in electrical engineering11 is certainly the tile, which can1 Magnetic Field Created by Tile Permanent Magnets R. Ravaud, G. Lemarquand, V. Lemarquand Abstract1 This paper presents the analytical calculation of the three components of the magnetic field

  15. Control strategy of a variable speed wind turbine with multipole permanent magnet synchronous generator

    E-Print Network [OSTI]

    values. Keywords: permanent magnet synchronous generator, variable speed wind turbine, direct driven wind). A multipole synchronous generator connected to a power converter can operate at low speeds, so that a gear canControl strategy of a variable speed wind turbine with multipole permanent magnet synchronous

  16. A RATE-INDEPENDENT MODEL FOR PERMANENT INELASTIC EFFECTS IN SHAPE MEMORY MATERIALS

    E-Print Network [OSTI]

    Stefanelli, Ulisse

    A RATE-INDEPENDENT MODEL FOR PERMANENT INELASTIC EFFECTS IN SHAPE MEMORY MATERIALS MICHELA ELEUTERI for isothermal stress-induced transforma- tion in shape memory polycrystalline materials in presence of permanent of the model to reduced/former ones by means of a rigorous -convergence analysis. 1. Introduction Shape-memory

  17. High energy product permanent magnet having improved intrinsic coercivity and method of making same

    DOE Patents [OSTI]

    Ramesh, Ramamoorthy (Berkeley, CA); Thomas, Gareth (Berkeley, CA)

    1990-01-01T23:59:59.000Z

    A high energy rare earth-ferromagnetic metal permanent magnet is disclosed which is characterized by improved intrinsic coercivity and is made by forming a particulate mixture of a permanent magnet alloy comprising one or more rare earth elements and one or more ferromagnetic metals and forming a second particulate mixture of a sintering alloy consisting essentially of 92-98 wt. % of one or more rare earth elements selected from the class consisting of Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu, and mixtures of two or more of such rare earth elements, and 2-8 wt. % of one or more alloying metals selected from the class consisting of Al, Nb, Zr, V, Ta, Mo, and mixtures of two or more of such metals. The permanent magnet alloy particles and sintering aid alloy are mixed together and magnetically oriented by immersing the mixture in an axially aligned magnetic field while cold pressing the mixture. The compressed mixture is then sintered at a temperature above the melting point of the sintering aid and below the melting point of the permanent magnet alloy to thereby coat the particle surfaces of the permanent magnetic alloy particles with the sintering aid while inhibiting migration of the rare earth element in the sintering aid into the permanent magnet alloy particles to thereby raise the intrinsic coercivity of the permanent magnet alloy without substantially lowering the high energy of the permanent magnet alloy.

  18. Design and Analysis of a Nested Halbach Permanent Magnet Magnetic Refrigerator

    E-Print Network [OSTI]

    Victoria, University of

    Design and Analysis of a Nested Halbach Permanent Magnet Magnetic Refrigerator by Armando Tura BEng Committee Design and Analysis of a Nested Halbach Permanent Magnet Magnetic Refrigerator by Armando Tura with the potential to create efficient and compact refrigeration devices is an active magnetic regenerative

  19. Real-Time Capable Methods to Determine the Magnet Temperature of Permanent Magnet

    E-Print Network [OSTI]

    Paderborn, Universität

    }@lea.upb.de Abstract--The permanent magnet synchronous motor (PMSM) is widely used in highly utilised automotive-based magnet temperature determination methods in PMSM. In this context, the existing publications can field. Keywords--PMSM, permanent magnet temperature, model- based real-time determination, motor control

  20. Post-Fire Debris-Flow Hazard Assessment of the Area Burned by the 2013 Beaver Creek Fire near Hailey, Central Idaho

    E-Print Network [OSTI]

    Torgersen, Christian

    Post-Fire Debris-Flow Hazard Assessment of the Area Burned by the 2013 Beaver Creek Fire near-flow hazard assessment of the area burned by the 2013 Beaver Creek Fire near Hailey, central Idaho: U­1273 Prepared in cooperation with Blaine County, Idaho #12;#12;Post-Fire Debris-Flow Hazard Assessment

  1. The Pumpkin Creek Watershed Limited Irrigation and No-Till Demonstration Gary L. Stone, Gary W. Hergert, Dean Yonts, Jim Schild, Rex A. Nielson and James Margheim

    E-Print Network [OSTI]

    Nebraska-Lincoln, University of

    in the Panhandle can fit into limited irrigation cropping systems in the Pumpkin Creek Watershed. The NPNRD allowsThe Pumpkin Creek Watershed Limited Irrigation and No-Till Demonstration Gary L. Stone, Gary W irrigation applies less water than is required to meet full evapotranspiration (ET) or irrigation demand

  2. Overview of GRI research at the Rock Creek Site, Black Warrior Basin. Overview of GRI research at Rock Creek: Eight years of cooperative research, coalbed methane shortcourse. Held in Birmingham, Alabama on October 21, 1992. Topical report

    SciTech Connect (OSTI)

    Schraufnagel, R.

    1992-10-01T23:59:59.000Z

    The presentation slides from the October 21, 1992 workshop on coalbed methane exploration and production are assembled in this volume. They illustrate the following discussions Overview of GRI Research at Rock Creek: Eight Years of Cooperative Research, Drilling and Completing Coalbed to the Formation: Perforations vs. Slotting, Coalbed Methane Well Testing in the Warrior Basin, Reservoir Engineering: A Case Study at Rock Creek, Fraccing of Multiple Thin Seams: Considerations and Constraints, Implementing Coal Seam Stimulations: Requirements for Successful Treatments, Coal-Fluid Interactions, Mine-Through Observations of Coal Seam Stimulations: Reality vs. Theory, and Improving Gas Production: Techniques of Operations.

  3. Overview of GRI research at the Rock Creek Site, Black Warrior Basin. Overview of GRI research at Rock Creek: Eight years of cooperative research, coalbed methane shortcourse. Held in Abingdon, Virginia on October 23, 1992. Topical report

    SciTech Connect (OSTI)

    Schraufnagel, R.

    1992-10-01T23:59:59.000Z

    The presentation slides from the October 23, 1992 workshop on coalbed methane exploration and production are assembled in this volume. They illustrate the following discussions: Overview of GRI Research at Rock Creek: Eight Years of Cooperative Research, Drilling and Completing Coalbed Methane Wells: Techniques for Fragile Formations, Connecting the Wellborne to the Formation: Perforations vs. Slotting, Coalbed Methane Well Testing in the Warrior Basin, Reservoir Engineering: A Case Study at Rock Creek, Fraccing of Multiple Thin Seams: Considerations and Constraints, Implementing Coal Seam Stimulations: Requirements for Successful Treatments, Coal-Fluid Interactions, Mine-Through Observations of Coal Seam Stimulations: Reality vs. Theory, and Recompleting Coalbed Methane Wells: The Second Try at Success.

  4. Sediment and radionuclide transport in rivers: radionuclide transport modeling for Cattaraugus and Buttermilk Creeks, New York

    SciTech Connect (OSTI)

    Onishi, Y.; Yabusaki, S.B.; Kincaid, C.T.; Skaggs, R.L.; Walters, W.H.

    1982-12-01T23:59:59.000Z

    SERATRA, a transient, two-dimensional (laterally-averaged) computer model of sediment-contaminant transport in rivers, satisfactorily resolved the distribution of sediment and radionuclide concentrations in the Cattaraugus Creek stream system in New York. By modeling the physical processes of advection, diffusion, erosion, deposition, and bed armoring, SERATRA routed three sediment size fractions, including cohesive soils, to simulate three dynamic flow events. In conjunction with the sediment transport, SERATRA computed radionuclide levels in dissolved, suspended sediment, and bed sediment forms for four radionuclides (/sup 137/Cs, /sup 90/Sr, /sup 239/ /sup 240/Pu, and /sup 3/H). By accounting for time-dependent sediment-radionuclide interaction in the water column and bed, SERATA is a physically explicit model of radionuclide fate and migration. Sediment and radionuclide concentrations calculated by SERATA in the Cattaraugus Creek stream system are in reasonable agreement with measured values. SERATRA is in the field performance phase of an extensive testing program designed to establish the utility of the model as a site assessment tool. The model handles not only radionuclides but other contaminants such as pesticides, heavy metals and other toxic chemicals. Now that the model has been applied to four field sites, including the latest study of the Cattaraugus Creek stream system, it is recommended that a final model be validated through comparison of predicted results with field data from a carefully controlled tracer test at a field site. It is also recommended that a detailed laboratory flume be tested to study cohesive sediment transport, deposition, and erosion characteristics. The lack of current understanding of these characteristics is one of the weakest areas hindering the accurate assessment of the migration of radionuclides sorbed by fine sediments of silt and clay.

  5. Lolo Hot Springs Resort Pool & Spa Low Temperature Geothermal Facility |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:Landowners andLodgepole, Nebraska: Energy ResourcesNebraska:WestOpen Energy

  6. Uranium in the Oatman Creek granite of Central Texas and its economic potential 

    E-Print Network [OSTI]

    Conrad, Curtis Paul

    1982-01-01T23:59:59.000Z

    potential uranium source. Th1s study focuses on an 80 acre outcrop of the Oatman Creek granite known as Bear Mountain, in Gillespie County, Texas. The gran1te is a medium-grained, gray to pink rock. Nodal analysis indicates the composit1on 1s 35. 5... economically feasible because of the relatively low concentration of uranium in most igneous rocks. Recent studies ot uranium have been confined largely to the origin and development of uranium deposits in sedimentary rocks, namely sandstones. In the futur e...

  7. Hydrocarbon trapping mechanisms in the Miller Creek area of the Powder River Basin, Wyoming

    E-Print Network [OSTI]

    Armstrong, Jennifer Ann

    1975-01-01T23:59:59.000Z

    production comes from Lower Cretaceous and Lower Permian sandstones. The horison studied, the Lower Cretaceous Dakota Sandstone, is a thin clastic wedge deposited during the initial Cretaceous transgression oi' the Artie Ocean - Gulf of Mexico seaway over... for the channels end orobable Recerwoir Trigood Lucerne 3 32-AN-66W Regional Pet Inc Corda%1 F-1 9-AN-68M SP -10~ 0 oem-m 50 0 oh'-m SP -10+ 6' 5900 Figure 3, Rlectric Log Profiles of Regional and Reservoir Dakota Sandstones. 10 I Q MILLER CREEK...

  8. Exploration of the Upper Hot Creek Ranch Geothermal Resource, Nye County, Nevada

    SciTech Connect (OSTI)

    Dick Benoit; David Blackwell

    2006-01-01T23:59:59.000Z

    The Upper Hot Creek Ranch (UHCR) geothermal system had seen no significant exploration activity prior to initiation of this GRED III project. Geochemical geothermometers calculated from previously available but questionable quality analyses of the UHCR hot spring waters indicated possible subsurface temperatures of +320 oF. A complex Quaternary and Holocene faulting pattern associated with a six mile step over of the Hot Creek Range near the UHCR also indicated that this area was worthy of some exploration activity. Permitting activities began in Dec. 2004 for the temperature-gradient holes but took much longer than expected with all drilling permits finally being received in early August 2005. The drilling and geochemical sampling occurred in August 2005. Ten temperature gradient holes up to 500’ deep were initially planned but higher than anticipated drilling and permitting costs within a fixed budget reduced the number of holes to five. Four of the five holes drilled to depths of 300 to 400’ encountered temperatures close to the expected regional thermal background conditions. These four holes failed to find any evidence of a large thermal anomaly surrounding the UHCR hot springs. The fifth hole, located within a narrow part of Hot Creek Canyon, encountered a maximum temperature of 81 oF at a depth of 105’ but had cooler temperatures at greater depth. Temperature data from this hole can not be extrapolated to greater depths. Any thermal anomaly associated with the UHCR geothermal system is apparently confined to the immediate vicinity of Hot Creek Canyon where challenges such as topography, a wilderness study area, and wetlands issues will make further exploration time consuming and costly. Ten water samples were collected for chemical analysis and interpretation. Analyses of three samples of the UHCR thermal give predicted subsurface temperatures ranging from 317 to 334 oF from the Na-K-Ca, silica (quartz), and Na-Li geothermometers. The fact that all three thermometers closely agree gives the predictions added credibility. Unfortunately, the final result of this exploration is that a moderate temperature geothermal resource has been clearly identified but it appears to be restricted to a relatively small area that would be difficult to develop.

  9. The investigation of the Caney Creek shipwreck archaeological site 41MG32

    E-Print Network [OSTI]

    Hedrick, David Layne

    1998-01-01T23:59:59.000Z

    Tribune [MCT], I ~ aeea I. LAKE CHARLES- SERNAR D 2. EDNA-TELFERNER S. PLEDGER 4. 8 RAZORIA-NORWOOD 5. SURFSIDE-VELASCO 6. LIVIA- FRANCI TAG 7, VESTON-PLACEDO S. GALVESTON- ADAMSVILLE e ann I a ukean f SAY c t ro ~ kara aeonn L e... (~aragorda County Tnbune [MCT], August 23, 1945, Section 2:2). Because of the production coming out of Caney Creek, local farmers and plantation owners soon began to pressure the Texas government for improvements to facilitate navigation. Sugar, cotton...

  10. Water quality monitoring at the Hoe Creek test site: review and preliminary conclusions

    SciTech Connect (OSTI)

    Wang, F.T.

    1983-01-01T23:59:59.000Z

    Post-burn monitoring of the ground water near to the Hoe creek underground coal gasification site showed that a broad range of gasification products had been introduced into the water system. Although many of these contaminants were eventually absorbed by the surrounding coal, some chemicals continued to appear in the water in concentrations higher than pre-test levels for several years after gasification. Possible mechanisms by which the contaminants entered the ground water include: (1) leakage of pyrolysis products; (2) post-burn leaching of coal ash and overburden rubble by returning ground water; and (3) dissolution of minerals outside the cavity by the CO/SUB/2 generated during gasification.

  11. Changes in major organic contaminants in the groundwater at the Hoe Creek underground coal gasification site

    SciTech Connect (OSTI)

    Wang, F.; Mead, W.

    1985-08-01T23:59:59.000Z

    The results of groundwater analysis at the Hoe Creek underground coal gasification (UCG) site have indicated that, after gasification, the phenolic compounds and neutral aromatic hydrocarbons decrease more slowly than expected on the basis of our laboratory studies. The field data also fail to confirm the expected inverse relationship between a contaminant's water solubility and the extent to which it is sorbed by surrounding coal. The authors described a mechanism for the deposition of coal pyrolysis products that may help to elucidate the observed behavior of these organic contaminants. 7 refs., 7 figs.

  12. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1996-04-01T23:59:59.000Z

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449&D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit.

  13. On Permanent and Sporadic Oscillations of the Magnetosphere

    E-Print Network [OSTI]

    Guglielmi, A V

    2014-01-01T23:59:59.000Z

    In this paper we investigate the impact of permanent oscillations Pc3 on the excitation of sporadic oscillations Pi2 ( their periods are 10-45 and 40-150 s, respectively ). The hypothesis is formulated that Pc3 oscillations originating in front of the magnetosphere penetrate into the geomagnetic tail, cause a local depression in the current in the neutral sheet, and under favorable conditions stimulate a tearing instability. This leads to reconnection of magnetic field lines and an explosive release of magnetic energy stored in the tail. As a result, a substorm breaks up, with sporadic pulsations Pi2 as an important element of this process. It is expected from theoretical estimates and kinematic considerations that the higher the Pc3 frequency, the earlier the Pi2 trains start. We test this prediction using observational data from satellite measurements of the interplanetary magnetic field and on-ground magnetic measurements. The results confirm the theoretical expectation. Additional routes are proposed to t...

  14. Method and system for controlling a permanent magnet machine

    DOE Patents [OSTI]

    Walters, James E.

    2003-05-20T23:59:59.000Z

    Method and system for controlling the start of a permanent magnet machine are provided. The method allows to assign a parameter value indicative of an estimated initial rotor position of the machine. The method further allows to energize the machine with a level of current being sufficiently high to start rotor motion in a desired direction in the event the initial rotor position estimate is sufficiently close to the actual rotor position of the machine. A sensing action allows to sense whether any incremental changes in rotor position occur in response to the energizing action. In the event no changes in rotor position are sensed, the method allows to incrementally adjust the estimated rotor position by a first set of angular values until changes in rotor position are sensed. In the event changes in rotor position are sensed, the method allows to provide a rotor alignment signal as rotor motion continues. The alignment signal allows to align the estimated rotor position relative to the actual rotor position. This alignment action allows for operating the machine over a wide speed range.

  15. Improvement of Anadromous Fish Habitat and Passage in Omak Creek, 2008 Annual Report : February 1, 2008 to January 31, 2009.

    SciTech Connect (OSTI)

    Dasher, Rhonda; Fisher, Christopher [Colville Confederated Tribes

    2009-06-09T23:59:59.000Z

    During the 2008 season, projects completed under BPA project 2000-100-00 included installation of riparian fencing, maintenance of existing riparian fencing, monitoring of at-risk culverts and installation of riparian vegetation along impacted sections of Omak Creek. Redd and snorkel surveys were conducted in Omak Creek to determine steelhead production. Canopy closure surveys were conducted to monitor riparian vegetation recovery after exclusion of cattle since 2000 from a study area commonly known as the Moomaw property. Additional redd and fry surveys were conducted above Mission Falls and in the lower portion of Stapaloop Creek to try and determine whether there has been successful passage at Mission Falls. Monitoring adult steelhead trying to navigate the falls resulted in the discovery of shallow pool depth at an upper pool that is preventing many fish from successfully navigating the entire falls. The Omak Creek Habitat and Passage Project has worked with NRCS to obtain additional funds to implement projects in 2009 that will address passage at Mission Falls, culvert replacement, as well as additional riparian planting. The Omak Creek Technical Advisory Group (TAG) is currently revising the Omak Creek Watershed Assessment. In addition, the group is revising strategy to focus efforts in targeted areas to provide a greater positive impact within the watershed. In 2008 the NRCS Riparian Technical Team was supposed to assess areas within the watershed that have unique problems and require special treatments to successfully resolve the issues involved. The technical team will be scheduled for 2009 to assist the TAG in developing strategies for these special areas.

  16. A "permanent" high-temperature superconducting magnet operated in thermal communication with a mass of solid nitrogen

    E-Print Network [OSTI]

    Haid, Benjamin J. (Benjamin John Jerome), 1974-

    2001-01-01T23:59:59.000Z

    This thesis explores a new design for a portable "permanent" superconducting magnet system. The design is an alternative to permanent low-temperature superconducting (LTS) magnet systems where the magnet is cooled by a ...

  17. The cow creek anticline: an example of disharmonic folding along the front of the Big Horn Mountains

    E-Print Network [OSTI]

    Dransfield, Betsy Jo

    1983-01-01T23:59:59.000Z

    . g. shale). Bucn a config- A 7000 7000 6000 Jm Js Jgs P Pa 6000 5000' 5000 0bI1 4000 C99f 4000 3000 0 Figure 17 ~ Cross-section A-A' i The nose of the Cow Creek Anti- cline shows no volume problems in the subsurface 45 Figure &8... Creek Anticline csr. best be solved. by bedding plane slip in the interbedded shales and limestones oi' the Devonian Jei'ferson Formation, Layer-parallel slip also rel~ ev a ' ocal volume problem in tne synclinal trough at the base oi' the monocline...

  18. Idaho Habitat Evaluation for Offsite Mitigation Record : Annual Report FY 1984.

    SciTech Connect (OSTI)

    Petrosky, Charles Edward; Holubetz, Terry

    1985-06-01T23:59:59.000Z

    An evaluation of existing and proposed habitat improvement projects for anadromous fish in the Clearwater River and Salmon River drainages was conducted. The Clearwater River and Salmon River drainages account for virtually all of Idaho's wild and natural production of summer steelhead and spring and summer chinook salmon, as well as a remnant run of sockeye salmon. Habitat enhancement projects are intended to either increase the amount of habitat, or increase the carrying capacity of existing (usually, degraded) habitat, or both. Migration barriers, such as waterfalls, culverts, and water diversions, can be modified to make available habitat that is not being used, or is underutilized, by anadromous fish. The objectives of this evaluation are: (1) document physical changes in habitat; (2) measure changes in steelhead and chinook production attributable to habitat enhancement projects; (3) measure changes in standing crops of resident fish species due to enhancement; and (4) determine project effectiveness, including relative costs and benefits, to establish the record of credit for mitigation and to guide future management actions. It was not possible to define the level of enhancement for any BPA project in 1984. Evaluations for all projects except three were in the pre-treatment phase during 1984. Because full benefits cannot be defined at current low seeding levels, projects must be monitored until full-seeding is approached. We obtained post-treatment information for three projects in 1984: Lolo Creek instream structures; upper Lochsa River instream structures; and screening of the irrigation diversion on Pole Creek. Of the three, only the Lolo Creek project exhibited any apparent benefits; these apparent benefits were not conclusively determined in 1984. The Lolo Creek project requires a follow-up evaluation in 1985. The Pole Creek project requires better passage for adult chinook at the irrigation diversion. 36 refs., 71 figs., 50 tabs. (ACR)

  19. The Oak Ridge Y-12 Plant biological monitoring and abatement program for East Fork Poplar Creek

    SciTech Connect (OSTI)

    Loar, J.M.; Adams, S.M.; Allison, L.J.; Giddings, J.M.; McCarthy, J.F.; Southworth, G.R.; Smith, J.G.; Stewart, A.J. (Oak Ridge National Lab., TN (USA); Springborn Bionomics, Inc., Wareham, MA (USA); Oak Ridge National Lab., TN (USA))

    1989-10-01T23:59:59.000Z

    In May 1985, a National Pollutant Discharge Elimination System permit was issued for the Oak Ridge Y-12 Plant, a nuclear weapons components production facility located in Oak Ridge, Tennessee, and operated by Martin Marietta Energy Systems, Inc., for the US Department of Energy. As a condition of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed to demonstrate that the effluent limitations established for the Oak Ridge Y-12 Plant protect the classified uses of the receiving stream (East Fork Poplar Creek), in particular, the growth and propagation of fish and aquatic life, as designated by the Tennessee Department of Health and Environment. A second purpose for the BMAP is to document the ecological effects resulting from implementation of a water pollution control program that will include construction of nine new wastewater treatment facilities over the next 4 years. Because of the complex nature of the effluent discharged to East Fork Poplar Creek and the temporal and spatial variability in the composition of the effluent (i.e., temporal variability related to various pollution abatement measures that will be implemented over the next several years and spatial variability caused by pollutant inputs downstream of the Oak Ridge Y-12 Plant), a comprehensive, integrated approach to biological monitoring was developed for the BMAP. 39 refs., 5 figs., 8 tabs.

  20. Water-quality monitoring at the Hoe Creek test site: review and preliminary conclusions

    SciTech Connect (OSTI)

    Wang, F.T.; Mead, S.W.; Stuermer, D.H.

    1983-04-16T23:59:59.000Z

    It has been shown that underground coal gasification (UCG) may introduce a broad range of residual gasification products into the groundwater of a coal aquifer. Sorption of many contaminants by the coal itself is an important factor in restricting the migration of these contaminants in the groundwater. However, our field studies at the Lawrence Livermore National Laboratory (LLNL) Hoe Creek site in northeastern Wyoming have shown that sorption of organic compounds by coal is not as effective as expected, perhaps because the coal surface area is limited. Furthermore, if severe roof collapse has taken place during gasification, non-coal aquifers located above the gasified coal seam may be interconnected with the coal aquifer. Contaminants may enter these non-coal aquifers, in which sorption is even less effective. The Hoe Creek II and III experiments have enabled us to study the contamination of a sand aquifer located above a gasified coal seam in a hydrological recharge area. Our preliminary results indicate that the water in the overlying sand aquifer is much less contaminated with organic compounds than that in the gasified coal aquifer. In conducting these field investigations, we have also learned valuable lessons concerning a strategy for groundwater monitoring. 21 figures.

  1. Burn cavity growth during the Hoe Creek No. 3 underground coal gasification experiment

    SciTech Connect (OSTI)

    Hill, R.W.

    1981-01-14T23:59:59.000Z

    A detailed history is given of the growth of the burn cavity during the first month of the Hoe Creek No. 3 underground coal gasification experiment near Gillette, Wyoming, in 1979. The changing shape of the cavity with time is inferred from data from three types of instruments installed throughout the experimental zone: (1) thermocouples at various levels in a number of holes, to map temperatures; (2) extensometers at various levels in other holes, to detect motions of the overburden material; and (3) high-frequency electromagnetic (HFEM) scans made between various pairs of holes, to detect cavities and zones of burning coal. Additional data on the final shape of the underground cavity are derived from the results of a core drilling program carried out from the surface after the burn had ended. This study of cavity growth history has contributed significantly to our understanding of how the in situ coal gasification process operates in sites like Hoe Creek. The diagnostic system provided invaluable information on cavity growth and on the interaction between the two coal seams. Some new problems with injection well survival and slag production in oxygen-steam burns were brought out, and the importance of understanding and controlling heat loss mechanisms was amply demonstrated. Although no one system of underground diagnostics can give all of the information needed to fully describe the in situ process, a combination of several diagnostic systems can be used to deduce a self-consistent description.

  2. Water quality monitoring at the Hoe Creek test site: review and preliminary conclusions

    SciTech Connect (OSTI)

    Wang, F.T.; Mead, S.W.; Sturmer, D.H.

    1983-01-01T23:59:59.000Z

    It has been shown that underground coal gasification (UCG) may introduce a broad range of residual products into the groundwater of a coal aquifer. Sorption of many contaminants by the coal itself is an important factor in restricting the migration of these contaminants in the groundwater. However, our field studies at the Lawrence Livermore National Laboratory (LLNL) Hoe Creek site in northeastern Wyoming have shown that sorption of organic compounds by coal is not as effective as expected, perhaps because the coal surface area is limited. Furthermore, if severe roof collapse has taken place during gasification, non-coal aquifers located above the gasified coal seam may become interconnected with the cavity. Contaminants may enter these non-coal aquifers, in which sorption is even less effective. The Hoe Creek II and III experiments have enabled us to study the contamination of a sand aquifer located above a gasified coal seam in a hydrological recharge area. The preliminary results indicate that the water in the overlying sand aquifer is much less contaminated with organic compounds than that in the gasified

  3. Burn cavity growth during the Hoe Creek No. 3 underground-coal-gasification experiment

    SciTech Connect (OSTI)

    Hill, R.W.

    1981-06-08T23:59:59.000Z

    A detailed history is given of the growth of the burn cavity during the first month of the Hoe Creek No. 3 underground coal gasification experiment near Gillette, Wyoming, in 1979. The changing shape of the cavity with time is inferred from data from three types of instruments installed throughout the experimental zone: (1) thermocouples at various levels in a number of holes, to map temperatures; (2) extensometers at various levels in other holes, to detect motions of the overburden material; and (3) high-frequency electromagnetic scans made between various pairs of holes, to detect cavities and zones of burning coal. Additional data on the final shape of the underground cavity is derived from the results of a core drilling program carried out from the surface after the burn had ended. This study of cavity growth history has contributed significantly to our understanding of how the in-situ coal gasification process operates in sites like Hoe Creek. The diagnostic system provided invaluable information on cavity growth and on the interaction between the two coal seams. Some new problems with injection well survival and slag production in oxygen-steam burns were brought out, and the importance of understanding and controlling heat loss mechanisms was amply demonstrated. Although no one system of underground diagnostics can give all of the information needed to fully describe the in-situ process, a combination of several diagnostic systems can be used to deduce a self-consistent description.

  4. Water-quality monitoring at the Hoe Creek test site: review and preliminary conclusions

    SciTech Connect (OSTI)

    Wang, F T; Mead, S W; Stuermer, D H

    1982-05-20T23:59:59.000Z

    It has been shown that underground coal gasification (UCG) may introduce a broad range of residual gasification products into the groundwater of a coal aquifer. Sorption of many contaminants by the coal itself is an important factor in restricting the migration of these contaminants in the ground water. However, field studies, conducted at Lawrence Livermore National Laboratory's Hoe Creek site, have shown that sorption of organic compounds by coal is not as effective as expected, perhaps because the coal surface area is limited. Furthermore, if severe roof collapse has taken place during gasification, non-coal aquifers located above the gasified coal seam may be interconnected with the coal aquifer, and contaminants may enter these non-coal aquifers, in which sorption is even less effective. The Hoe Creek II and III experiments have provided opportunities to study the contamination of a sand aquifer located above a gasified coal seam in a hydrological recharge area. Preliminary results indicate that the water in the overlying sand aquifer is much less contaminated with organic compounds than the water in the gasified coal aquifer. In conducting these field investigations, valuable lessons ere learned concerning groundwater monitoring. A suggested monitoring strategy is discussed.

  5. Fabrication and Performance of Silicon-Embedded Permanent-Magnet Microgenerators

    E-Print Network [OSTI]

    Herrault, Florian

    This paper focuses on the design, fabrication, and characterization of silicon-packaged permanent-magnet (PM) microgenerators. The use of silicon packaging favors fine control on shape and dimensions in batch fabrication ...

  6. ACTIVE SUSPENSION CONTROL WITH DIRECT-DRIVE TUBULAR LINEAR BRUSHLESS PERMANENT-MAGNET MOTOR

    E-Print Network [OSTI]

    Lee, Seungho

    2010-01-16T23:59:59.000Z

    Recently, active suspension has been applied to many commercial automobiles. To develop the control algorithm for active suspension, a quarter-car test bed was built by using a direct-drive tubular linear brushless permanent-magnet motor (LBPMM...

  7. Design and analysis of a permanent magnet generator for naval applications

    E-Print Network [OSTI]

    Rucker, Jonathan E. (Jonathan Estill)

    2005-01-01T23:59:59.000Z

    This paper discusses the electrical and magnetic design and analysis of a permanent magnet generation module for naval applications. Numerous design issues are addressed and several issues are raised about the potential ...

  8. Dual Functional Polyelectrolyte Multilayer Coatings for Implants: Permanent Microbicidal Base with Controlled Release of Therapeutic Agents

    E-Print Network [OSTI]

    Wong, Sze Yinn

    Here we present a new bifunctional layer-by-layer (LbL) construct made by combining a permanent microbicidal polyelectrolyte multilayered (PEM) base film with a hydrolytically degradable PEM top film that offers controlled ...

  9. Experimental verification for the design of a doubly-fed permanent magnetic generator

    E-Print Network [OSTI]

    Lu, Bin, Ph. D. Massachusetts Institute of Technology

    2007-01-01T23:59:59.000Z

    This is a continuous work on the project of a doubly-fed permanent magnet (DFPM) generator for wind turbines. The construction of a prototype machine was finally finished and experiments were conducted to verify the design ...

  10. Vibration sensors utilizing fiber fabry-perot interferometers and permanent magnets

    E-Print Network [OSTI]

    Conkey, Andrew P.

    2009-05-15T23:59:59.000Z

    A unique set of vibration sensors was designed that incorporate the fiber Fabry-Perot interferometer (FFPI) and permanent magnets. Feasibility of the design and its advantages over traditional sensors were verified by experiments. The new sensors...

  11. DOE-Sponsored Field Test Finds Potential for Permanent Storage of CO2 in Lignite Seams

    Broader source: Energy.gov [DOE]

    A field test sponsored by the U.S. Department of Energy has demonstrated that opportunities to permanently store carbon in unmineable seams of lignite may be more widespread than previously documented.

  12. Factors affecting the permanence of livestock projects undertaken by Heifer International-Mexico

    E-Print Network [OSTI]

    Arispe, Sergio Adrian

    2003-01-01T23:59:59.000Z

    in the state of Durango, Mexico. This study identified and analyzed the factors affecting the permanence of hog and dairy cow projects in four communities in the state of Durango, Mexico. The researcher interviewed seven project managers and 35 beneficiaries...

  13. The overview and history of permanent magnet devices in accelerator technology

    SciTech Connect (OSTI)

    Kraus, R.H. Jr.

    1993-10-01T23:59:59.000Z

    This paper reviews the early history of accelerator development with a particular focus on the important discoveries that opened the door for the application of permanent-magnet materials to this area of science. Researchers began to use permanent-magnet materials in particle accelerators soon after the invention of the alternating gradient principle, that showed magnetic fields could be used to control the transverse envelope of charged-particle beams. Since that time, permanent-magnet materials have found wide application in the modern charged particle accelerator. The history of permanent-magnet use in accelerator physics and technology is outlined, general design considerations are presented, and material properties of concern for particle accelerator applications are discussed.

  14. An evaluation of permanent deformation properties of crumb rubber modified (CRM) asphalt concrete mixtures 

    E-Print Network [OSTI]

    Makunike, Danai Ellarin

    1995-01-01T23:59:59.000Z

    that are associated with permanent deformation. These include Hveem stability, air voids, permeability, creep response, and compressive strength. Three CRMAC mixtures were used, each containing different amounts of RAP. The study aimed at defining how these properties...

  15. Prospects for Non-Rare Earth Permanent Magnets for Traction Motors and Generators

    SciTech Connect (OSTI)

    Kramer, Matthew; McCallum, Kendall; Anderson, Iver; Constantinides, Steven

    2012-06-29T23:59:59.000Z

    With the advent of high-flux density permanent magnets based on rare earth elements such as neodymium (Nd) in the 1980s, permanent magnet-based electric machines had a clear performance and cost advantage over induction machines when weight and size were factors such as in hybrid electric vehicles and wind turbines. However, the advantages of the permanent magnet-based electric machines may be overshadowed by supply constraints and high prices of their key constituents, rare earth elements, which have seen nearly a 10-fold increase in price in the last 5 years and the imposition of export limits by the major producing country, China, since 2010. We outline the challenges, prospects, and pitfalls for several potential alloys that could replace Nd-based permanent magnets with more abundant and less strategically important elements.

  16. Structural optimisation of permanent magnet direct drive generators for 5MW wind turbines 

    E-Print Network [OSTI]

    Zavvos, Aristeidis

    2013-11-28T23:59:59.000Z

    This thesis focuses on permanent magnet "direct drive" electrical generators for wind turbines with large power output. A variety of such generator topologies is reviewed, tested and optimised in an attempt to increase ...

  17. Evaluation of the filler effects on fatique cracking and permanent deformation of asphalt concrete mixtures 

    E-Print Network [OSTI]

    Izzo, Richard P

    1997-01-01T23:59:59.000Z

    The addition of hydrated lime to asphalt has shown to be beneficial with an improvement in the Theological properties of the binder, as well as resistance to permanent deformation (rutting) and fatigue cracking of asphalt concrete mixtures...

  18. Evaluation of the filler effects on fatique cracking and permanent deformation of asphalt concrete mixtures

    E-Print Network [OSTI]

    Izzo, Richard P

    1997-01-01T23:59:59.000Z

    The addition of hydrated lime to asphalt has shown to be beneficial with an improvement in the Theological properties of the binder, as well as resistance to permanent deformation (rutting) and fatigue cracking of asphalt concrete mixtures...

  19. An Assessment of the Natural and Anthropogenic Geochemistry of the Red Mountain Creek Watershed: Ironton Mining District, Colorado

    E-Print Network [OSTI]

    Litt, Joshua

    2014-04-29T23:59:59.000Z

    Red Mountain Creek is located in the rich mineralized San Juan Mountains of Southwestern Colorado, where mining from the mid 1800s through the late 1970s occurred. Sampling of the Uncompahgre River in the late 1970s, which is downstream of the five...

  20. Biological monitoring of Upper Three Runs Creek, Savannah River Site, Aiken County, South Carolina, March 1990--July 1991

    SciTech Connect (OSTI)

    Not Available

    1991-12-01T23:59:59.000Z

    In anticipation of the fall 1988 start up of effluent discharges into Upper Three Runs Creek by the F/H Area Effluent Treatment Facility of the Savannah River Site, Aiken, SC, a two and one half year biological study was initiated in June 1987. Upper Three Runs Creek is an intensively studied fourth order stream known for its high species richness. Designed to assess the potential impact of F/H area effluent on the creek, the study included qualitative and quantitative macroinvertebrate stream surveys at five sites (see map), chronic toxicity testing of the effluent, water chemistry and bioaccumulation analysis. In a March 1990 study of the potential impact of F/H Area effluent on the macroinvertebrate communities of Upper Three Runs Creek was extended, with reductions in the number of sites to be sampled and in the frequency of water chemistry sampling. This report presents the results of macroinvertebrate stream surveys at three sites, chronic toxicity testing of the effluent and water chemistry analysis of the three stream sites and the effluent from March 1990 to July 1991.

  1. The development of an aquatic spill model for the White Oak Creek watershed, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Johnson, R.O.

    1996-05-01T23:59:59.000Z

    This study develops an aquatic spill model applicable to the White Oak Creek watershed draining the Oak Ridge National Laboratory. Hazardous, toxic, and radioactive chemicals are handled and stored on the laboratory reservation. An accidental spill into the White Oak Creek watershed could contaminate downstream water supplies if insufficient dilution did not occur. White Oak Creek empties into the Clinch River, which flows into the Tennessee River. Both rivers serve as municipal water supplies. The aquatic spill model provides estimates of the dilution at sequential downstream locations along White Oak creek and the Clinch River after an accidental spill of a liquid containing a radioactively decaying constituent. The location of the spill on the laboratory is arbitrary, while hydrologic conditions range from drought to extreme flood are simulated. The aquatic spill model provides quantitative estimates with which to assess water quality downstream from the site of the accidental spill, allowing an informed decision to be made whether to perform mitigating measures so that the integrity of affected water supplies is not jeopardized.

  2. Primary Causes of Death After Permanent Prostate Brachytherapy

    SciTech Connect (OSTI)

    Bittner, Nathan [Department of Radiation Oncology, University of Washington, Seattle, WA (United States); Merrick, Gregory S. [Schiffler Cancer Center Wheeling Jesuit University, Wheeling, WV (United States)], E-mail: gmerrick@urologicresearchinstitute.org; Galbreath, Robert W.; Butler, Wayne M. [Schiffler Cancer Center Wheeling Jesuit University, Wheeling, WV (United States); Wallner, Kent E. [Department of Radiation Oncology, University of Washington, Seattle, WA (United States); Radiation Oncology, Puget Sound Healthcare Corporation, Department of Veterans Affairs, Seattle, WA (United States); Allen, Zachariah A.; Brammer, Sarah G. [Schiffler Cancer Center Wheeling Jesuit University, Wheeling, WV (United States); Moyad, Mark [Department of Urology, University of Michigan Medical Center, Ann Arbor, MI (United States)

    2008-10-01T23:59:59.000Z

    Purpose: To evaluate the primary causes of death in low-risk (low-risk), intermediate-risk (intermediate-risk), and high-risk (high-risk) patients undergoing permanent prostate brachytherapy with or without supplemental therapies. Methods and Materials: From April 1995 through November 2004, a total of 1,354 consecutive patients underwent prostate brachytherapy. All patients underwent brachytherapy >3 years before analysis. Of the patients, 532 (39.3%) received androgen deprivation therapy and 703 (51.9%) received supplemental radiation therapy. The median follow-up was 5.4 years. Multiple parameters were evaluated as predictors of cause-specific, biochemical progression-free, and overall survival. Results: The 10-year cause-specific survival was 97.0% (99.7%, 99.0%, and 90.1% for low-risk, intermediate-risk, and high-risk patients). Overall survival was 76.7% (82.5%, 78.3%, and 67.6% for low-, intermediate-, and high-risk patients, respectively). The cumulative death rate for cardiovascular disease was 11.5% (8.7%, 9.3%, and 19.8% for low-, intermediate-, and high-risk patients). The death rate from second malignancies (nonprostate cancer) was 7.2% and was not substantially different when stratified by risk group. Death from all other causes was 6.5% for the entire cohort but 1.3%, 5.0%, and 10.8% for low-, intermediate-, and high-risk patients. In multivariate analysis, death from prostate cancer was best predicted by Gleason score and risk group, whereas death from cardiovascular disease, nonprostate cancer, and all other causes were most closely related to patient age and tobacco use. Conclusions: Although cardiovascular mortality was the predominant cause of death, prostate cancer was responsible for approximately 10% of all deaths. In particular, overall survival was poorest in the high-risk group. Although high-risk patients were most likely to die of prostate cancer, the divergence in overall survival between high-risk and lower-risk patients primarily resulted from an excess of cardiovascular deaths. Changes in lifestyle to improve cardiovascular health may improve overall survival in patients with clinically localized prostate cancer.

  3. White Oak Creek watershed: Melton Valley area Remedial Investigation report, at the Oak Ridge National Laboratory, Oak Ridge, Tennessee: Volume 2, Appendixes A and B

    SciTech Connect (OSTI)

    NONE

    1996-11-01T23:59:59.000Z

    This document contains Appendixes A ``Source Inventory Information for the Subbasins Evaluated for the White Oak Creek Watershed`` and B ``Human Health Risk Assessment for White Oak Creek / Melton Valley Area`` for the remedial investigation report for the White Oak Creek Watershed and Melton Valley Area. Appendix A identifies the waste types and contaminants for each subbasin in addition to the disposal methods. Appendix B identifies potential human health risks and hazards that may result from contaminants present in the different media within Oak Ridge National Laboratory sites.

  4. Natural Propagation and Habitat Improvement, Volume I, Oregon, Supplement A: Habitat Enhancement Evaluation of Fish and Wash Creeks, 1983 Annual Report.

    SciTech Connect (OSTI)

    Everest, Fred

    1984-04-01T23:59:59.000Z

    Habitat improvements for anadromous salmonids on Fish Creek in the upper Clackamas Basin were evaluated. The primary objectives of the evaluation effort include: (1) evaluate and quantify the changes in salmonid spawning and rearing habitat resulting from a variety of habitat improvements; (2) evaluate and quantify the changes in fish populations and biomass resulting from habitat improvements; and (3) evaluate the cost-effectiveness of habitat improvements developed with BPA and KV funds on Fish Creek. This report integrates data for the evaluation efforts collected in the Fish Creek Basin in 1982 and 1983. 3 references, 34 figures, 23 tables.

  5. Two-dimensional water quality modeling of Town Creek embayment on Guntersville Reservoir

    SciTech Connect (OSTI)

    Bender, M.D.; Shiao, Ming C.; Hauser, G.E. (Tennessee Valley Authority, Norris, TN (USA). Engineering Lab.); Butkus, S.R. (Tennessee Valley Authority, Norris, TN (USA). Water Quality Dept.)

    1990-09-01T23:59:59.000Z

    TVA investigated water quality of Town Creek embayment using a branched two-dimensional model of Guntersville Reservoir. Simulation results were compared in terms of algal biomass, nutrient concentrations, and volume of embayment with depleted dissolved oxygen. Stratification and flushing play a significant role in the embayment water quality. Storms introduce large loadings of organics, nutrients, and suspended solids. Dissolved oxygen depletion is most severe after storms followed by low flow that fails to flush the embayment. Embayment water quality responses to potential animal waste and erosion controls were explored. Modeling indicated animal waste controls were much more cost-effective than erosion controls. Erosion controls will decrease embayment suspended solids and thereby increase algal biomass due to greater light penetration. 29 refs., 16 figs., 4 tabs.

  6. Risk based optimization of the frequency of EDG on-line maintenance at Hope Creek

    SciTech Connect (OSTI)

    Knoll, A. [Public Service Electric & Gas, Hancocks Bridge, NJ (United States); Samanta, P.K. [Brookhaven National Lab., Upton, NY (United States); Vesely, W.E. [Science Applications International, Dublin, OH (United States)

    1996-09-01T23:59:59.000Z

    This paper presents a study to optimize the frequency of on-line maintenance of the emergency diesel generators at Hope Creek. This study was directed towards identifying, analyzing, and modifying maintenance planning and scheduling practices to assure the high availability of emergency diesel generators. Input from application of a recently developed reliability model, from considerations of probabilistic safety assessment, plant-specific experience, insights from personnel involved in EDG maintenance, and other practical issues were used to define a maintenance schedule that balances its beneficial and adverse impacts. Conclusions resulted in feasible recommendations to optimize and reduce the frequency of diesel on-line maintenance, allowing additional resources to better maintain other equipment important to safety.

  7. Refinement of the twinned structure of cymrite from the Ruby Creek deposit (Alaska)

    SciTech Connect (OSTI)

    Bolotina, N. B.; Rastsvetaeva, R. K., E-mail: rast@ns.crys.ras.ru; Kashaev, A. A. [Russian Academy of Sciences, Shubnikov Institute of Crystallography (Russian Federation)

    2010-07-15T23:59:59.000Z

    The mineral cymrite from the Ruby Creek deposit (Alaska) was reinvestigated by X-ray diffraction in a pseudo-orthorhombic unit cell with a = 5.3350(1) A, b = 36.9258(8) A, c = 7.6934(1) A, {beta} = 90.00(1){sup o}. A twin law corresponding to a sixfold axis was revealed for the first time. The structure was refined in the monoclinic space group P12{sub 1}1 to the R factor of 5.4%. The Al and Si atoms are assumed to be ordered within a double layer. The rotation of the cation sublattice by 60{sup o} around the c axis leads to the disorder of the T sites in the crystal structure (T = Al, Si).

  8. Supplying LNG markets using nitrogen rejection units at Exxon Shute Creek Facility

    SciTech Connect (OSTI)

    Hanus, P.M.; Kimble, E.L. [Exxon Co. USA, Midland, TX (United States)

    1995-11-01T23:59:59.000Z

    Interest is growing in the United States for using Liquid Natural Gas (LNG) as an alternative transportation fuel for diesel and as a source of heating fuel. For gas producers, LNG offers a premium price opportunity versus conventional natural gas sales. To supply this developing market, two existing Nitrogen Rejection Units (NRU) at the Exxon Shute Creek Facility in Wyoming were modified allowing LNG extraction and truck loading for transport to customers. The modifications involved adding heat exchanger capacity to the NRUs to compensate for the refrigeration loss when LNG is removed. Besides allowing for LNG extraction, the modifications also debottlenecked the NRUs resulting in higher methane recovery and lower compression costs. With the modifications, the NRUs are capable of producing for sale 60,000 gpd (5 MMscfd gas equivalent) of high purity LNG. Total investment has been $5 million with initial sales of LNG occurring in September 1994.

  9. Examination of eastern oil shale disposal problems - the Hope Creek field study

    SciTech Connect (OSTI)

    Koppenaal, D.W.; Kruspe, R.R.; Robl, T.L.; Cisler, K.; Allen, D.L.

    1985-02-01T23:59:59.000Z

    A field-based study of problems associated with the disposal of processed Eastern oil shale was initiated in mid-1983 at a private research site in Montgomery County, Kentucky. The study (known as the Hope Creek Spent Oil Shale Disposal Project) is designed to provide information on the geotechnical, revegetation/reclamation, and leachate generation and composition characteristics of processed Kentucky oil shales. The study utilizes processed oil shale materials (retorted oil shale and reject raw oil shale fines) obtained from a pilot plant run of Kentucky oil shale using the travelling grate retort technology. Approximately 1000 tons of processed oil shale were returned to Kentucky for the purpose of the study. The study, composed of three components, is described. The effort to date has concentrated on site preparation and the construction and implementation of the field study research facilities. These endeavors are described and the project direction in the future years is defined.

  10. Results of long term ground surface measurements at the Hoe Creek III site

    SciTech Connect (OSTI)

    Ganow, H.C.

    1984-08-10T23:59:59.000Z

    Ground surface subsidence was first observed over the Hoe Creek III burn cavity 21 days after gasification ceased. It manifested itself as a small circular depression or sink and was followed five days later by the formation of a second collapse structure. Concurrently, a single large elliptically shaped depression, whose major axis parallels the experimental axis, slowly formed over the burn cavity. These features appear to represent two distinctly different deformation modes. The first mode includes discrete voids that propagate rapidly upward. The second mode is represented by the elliptically shaped classical subsidence depression that forms slowly by a strata bending. Seventeen isolation type survey monuments have been used to track both the horizontal (one dimensional) and vertical motion components intermittently over a 54 month span. The resulting data set is combined with ground surface sketches and post-burn core drilling results and provides an important case study against which numerical and centrifugation model results can be compared. 5 references, 13 figures.

  11. Ground-water effects of the UCG experiments at the Hoe Creek site in northeastern Wyoming

    SciTech Connect (OSTI)

    Mead, S.W.; Wang, F.T.; Stuermer, D.H.

    1981-06-01T23:59:59.000Z

    Ground-water changes and subsidence effects associated with three underground coal gasification (UCG) experiments have been monitored at the Hoe Creek site in northeastern Wyoming. Ground-water quality measurements have extended over a period of four years and have been supplemented by laboratory studies of contaminant sorption by coal. It was found that a broad range of residual gasification products are introduced into the ground-water system. These contaminants may be of environmental significance if they find their way, in sufficient concentrations, into surface waters, or into aquifers from which water is extracted for drinking or agricultural purposes. Fortunately, the concentrations of these contaminants are substantially reduced by sorption on the surrounding coal. However, recent field measurements indicate that there may be significant limitations on this natural cleansing process. The contaminants of potential concern, and the mechanisms that affect their deposition and persistence have been identified.

  12. Structural characterization of terrestrial microbial Mn oxides from Pinal Creek, AZ

    SciTech Connect (OSTI)

    Bargar, John; Fuller, Christopher; Marcus, Matthew A.; Brearley, Adrian J.; Perez De la Rosa, M.; Webb, Samuel M.; Caldwell, Wendel A.

    2008-03-19T23:59:59.000Z

    The microbial catalysis of Mn(II) oxidation is believed to be a dominant source of abundant sorption- and redox-active Mn oxides in marine, freshwater, and subsurface aquatic environments. In spite of their importance, environmental oxides of known biogenic origin have generally not been characterized in detail from a structural perspective. Hyporheic zone Mn oxide grain coatings at Pinal Creek, Arizona, a metals-contaminated stream, have been identified as being dominantly microbial in origin and are well studied from bulk chemistry and contaminant hydrology perspectives. This site thus presents an excellent opportunity to study the structures of terrestrial microbial Mn oxides in detail. XRD and EXAFS measurements performed in this study indicate that the hydrated Pinal Creek Mn oxide grain coatings are layer-type Mn oxides with dominantly hexagonal or pseudo-hexagonal layer symmetry. XRD and TEM measurements suggest the oxides to be nanoparticulate plates with average dimensions on the order of 11 nm thick x 35 nm diameter, but with individual particles exhibiting thickness as small as a single layer and sheets as wide as 500 nm. The hydrated oxides exhibit a 10-A basal-plane spacing and turbostratic disorder. EXAFS analyses suggest the oxides contain layer Mn(IV) site vacancy defects, and layer Mn(III) is inferred to be present, as deduced from Jahn-Teller distortion of the local structure. The physical geometry and structural details of the coatings suggest formation within microbial biofilms. The biogenic Mnoxides are stable with respect to transformation into thermodynamically more stable phases over a time scale of at least 5 months. The nanoparticulate layered structural motif, also observed in pure culture laboratory studies, appears to be characteristic of biogenic Mn oxides and may explain the common occurrence of this mineral habit in soils and sediments.

  13. The effect of fractures, faults, and sheared shale zones on the hydrology of Bear Creek Burial Grounds A-South, Oak Ridge, Tennessee

    E-Print Network [OSTI]

    Hollon, Dwight Mitchell

    1997-01-01T23:59:59.000Z

    Previous hydrologic models of flow in Bear Creek Valley have presented lateral flow as occurring through the Nolichucky Shale in parallel to strike fractures within thin carbonate beds; the effects of faults were not considered. This study presents...

  14. Reservoir Simulation and Evaluation of the Upper Jurassic Smackover Microbial Carbonate and Grainstone-Packstone Reservoirs in Little Cedar Creek Field, Conecuh County, Alabama

    E-Print Network [OSTI]

    Mostafa, Moetaz Y

    2013-04-25T23:59:59.000Z

    This thesis presents an integrated study of mature carbonate oil reservoirs (Upper Jurassic Smackover Formation) undergoing gas injection in the Little Cedar Creek Field located in Conecuh County, Alabama. This field produces from two reservoirs...

  15. The effect of fractures, faults, and sheared shale zones on the hydrology of Bear Creek Burial Grounds A-South, Oak Ridge, Tennessee 

    E-Print Network [OSTI]

    Hollon, Dwight Mitchell

    1997-01-01T23:59:59.000Z

    Previous hydrologic models of flow in Bear Creek Valley have presented lateral flow as occurring through the Nolichucky Shale in parallel to strike fractures within thin carbonate beds; the effects of faults were not considered. This study presents...

  16. Status and Monitoring of Natural and Supplemented Chinook Salmon in Johnson Creek, Idaho, 2006-2007 Annual Report.

    SciTech Connect (OSTI)

    Rabe, Craig D.; Nelson, Douglas D. [Nez Perce Tribe

    2008-11-17T23:59:59.000Z

    The Nez Perce Tribe Johnson Creek Artificial Propagation Enhancement Project (JCAPE) has conducted juvenile and adult monitoring and evaluation studies for its 10th consecutive year. Completion of adult and juvenile Chinook salmon studies were conducted for the purpose of evaluating a small-scale production initiative designed to increase the survival of a weak but recoverable spawning aggregate of summer Chinook salmon Oncorhynchus tshawytscha. The JCAPE program evaluates the life cycle of natural origin (NOR) and hatchery origin (HOR) supplementation fish to quantify the key performance measures: abundance, survival-productivity, distribution, genetics, life history, habitat, and in-hatchery metrics. Operation of a picket style weir and intensive multiple spawning ground surveys were completed to monitor adult Chinook salmon and a rotary screw trap was used to monitor migrating juvenile Chinook salmon in Johnson Creek. In 2007, spawning ground surveys were conducted on all available spawning habitat in Johnson Creek and one of its tributaries. A total of 63 redds were observed in the index reach and 11 redds for all other reaches for a combined count of 74 redds. Utilization of carcass recovery surveys and adult captures at an adult picket weir yielded a total estimated adult escapement to Johnson Creek of 438 Chinook salmon. Upon deducting fish removed for broodstock (n=52), weir mortality/ known strays (n=12), and prespawning mortality (n=15), an estimated 359 summer Chinook salmon were available to spawn. Estimated total migration of brood year 2005 NOR juvenile Chinook salmon at the rotary screw trap was calculated for three seasons (summer, fall, and spring). The total estimated migration was 34,194 fish; 26,671 of the NOR migrants left in the summer (July 1 to August 31, 2005) as fry/parr, 5,852 left in the fall (September 1 to November 21, 2005) as presmolt, and only 1,671 NOR fish left in the spring (March 1 to June 30, 2006) as smolt. In addition, there were 120,415 HOR supplementation smolts released into Johnson Creek during the week of March 12, 2007. Life stage-specific juvenile survival from Johnson Creek to Lower Granite and McNary dams was calculated for brood year 2005 NOR and HOR supplementation juvenile Chinook salmon. Survival of NOR parr Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 28.2% and 16.2%. Survival of NOR presmolt Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 28.2% and 22.3%. Survival of NOR smolt Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 44.7% and 32.9%. Survival of HOR smolt Chinook salmon migrating from Johnson Creek to Lower Granite and McNary dams was 31.9% and 26.2%. Multi-year analysis on smolt to adult return rate's (SAR's) and progeny to parent ratio's (P:P's) were calculated for NOR and HOR supplementation Brood Year 2002 Chinook salmon. SAR's were calculated from Johnson Creek to Johnson Creek (JC to JC), Lower Granite Dam to Lower Granite (LGD to LGD), and Lower Granite Dam to Johnson Creek (LGD to JC); for NOR fish SAR's were 0.16%, 1.16% and 1.12%, while HOR supplementation SAR's from JC to JC, LGD to LGD and LGD to JC were 0.04%, 0.19% and 0.13%. P:P's for all returning NOR and HOR supplemented adults were under replacement levels at 0.13 and 0.65, respectively. Recruit per spawner estimates (R/S) for Brood Year 2005 adult Chinook salmon were also calculated for NOR and HOR supplemented Chinook salmon at JC and LGD. R/S estimates for NOR and HOR supplemented fish at JC were 231 and 1,745, while R/S estimates at LGD were 67 and 557. Management recommendations address (1) effectiveness of data collection methods, (2) sufficiency of data quality (statistical power) to enable management recommendations, (3) removal of uncertainty and subsequent cessation of M&E activities, and (4) sufficiency of findings for program modifications prior to five-year review.

  17. Phase 2 confirmatory sampling data report, Lower East Fork Poplar Creek, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1998-01-01T23:59:59.000Z

    A Remedial Investigation of East Fork Poplar Creek (EFPC) concluded that mercury is the principal contaminant of concern in the EFPC floodplain. The highest concentrations of mercury were found to be in a visually distinct black layer of soil that typically lies 15 to 30 cm (6 to 12 in.) below the surface. Mercury contamination was found to be situated in distinct areas along the floodplain, and generally at depths > 20 cm (8 in.) below the surface. In accordance with Comprehensive, Environmental Response, Compensation, and Liability Act (CERCLA), a feasibility study was prepared to assess alternatives for remediation, and a proposed plan was issued to the public in which a preferred alternative was identified. In response to public input, the plan was modified and US Department of Energy (DOE) issued a Record of Decision in 1995 committing to excavating all soil in the EFPC floodplain exceeding a concentration of 400 parts per million (ppm) of mercury. The Lower East Fork Poplar Creek (LEFPC) remedial action (RA) focuses on the stretch of EFPC flowing from Lake Reality at the Y-12 Plant, through the city of Oak Ridge, to Poplar Creek on the Oak Ridge Reservation (ORR) and its associated floodplain. Specific areas were identified that required remediation at the National Oceanographic and Atmospheric Administration (NOAA) Site along Illinois Avenue and at the Bruner Site along the Oak Ridge Turnpike. The RA was conducted in two separate phases. Phase 2, conducted from February to October 1997, completed the remediation efforts at the NOAA facility and fully remediated the Bruner Site. During both phases, data were collected to show that the remedial efforts performed at the NOAA and Bruner sites were successful in implementing the Record of Decision and had no adverse impact on the creek water quality or the city of Oak Ridge publicly owned treatment works.

  18. Sediment and radionuclide transport in rivers. Phase 2. Field sampling program for Cattaraugus and Buttermilk Creeks, New York

    SciTech Connect (OSTI)

    Walters, W.H.; Ecker, R.M.; Onishi, Y.

    1982-04-01T23:59:59.000Z

    As part of a study on sediment and radionuclide transport in rivers, Pacific Northwest Laboratory (PNL) is investigating the effect of sediment on the transport of radionuclides in Cattaraugus and Buttermilk Creeks, New York. A source of radioactivity in these creeks is the Western New York Nuclear Service Center which consists of a low-level waste disposal site and a nuclear fuel reprocessing plant. Other sources of radioactivity include fallout from worldwide weapons testing and natural background radioactivity. The major objective of the PNL Field Sampling Program is to provide data on sediment and radionuclide characteristics in Cattaraugus and Buttermilk Creeks to verify the use of the Sediment and Radionuclide Transport model, SERATRA, for nontidal rivers. This report covers the results of field data collection conducted during September 1978. Radiological analysis of sand, silt, and clay size fractions of suspended and bed sediment, and water were performed. Results of these analyses indicate that the principal radionuclides occurring in these two water courses, with levels significantly higher than background levels, during the Phase 2 sampling program were Cesium-137 and Strontium-90. These radionuclides had significantly higher activity levels above background in the bed sediment, suspended sediment, and water samples. Other radionuclides that are possibly being released into the surface water environment by the Nuclear Fuel Services facilities are Plutonium-238, 239, and 240, Americium-241, Curium-244, and Tritium. More radionuclides were consistently found in the bed sediment as compared to suspended sediment. The fewest radionuclides were found in the water of Buttermilk and Cattaraugus Creeks. The higher levels were found in the bed sediments for the gamma-emitters and in the suspended sediment for the alpha and beta-emitters (not including Tritium).

  19. Quaternary history of Red Mountain Creek Valley and its relation to the Rio Grande glacier system near Creede, CO

    SciTech Connect (OSTI)

    Kitchens, S. (Smith Coll., Northampton, MA (United States). Dept. of Geology)

    1993-03-01T23:59:59.000Z

    Interactions between the Rio Grande glacier system and the Red Mountain Creek glacier are more complex than previously believed. Although both glaciers were fed by the same ice cap along the continental divide, the timing and number of advances are different. Analysis of air photos and field relationships reveal a series of end moraines at the mouth of Red Mountain Creek. The presence of these moraines disproves the hypothesis of Atwood and Mather (1932) that the two were confluent during the last phase of glaciation. The degree of weathering rind development on mafic cobbles was used together with the degree of clay mineral development in the soils to determine relative ages and the number of advances in each system. The less than 2[mu]m material for X-ray diffraction analysis was separated from soil samples collected from pits excavated on the tops of end moraines. Both smectite and kaolinite were found within the soil profile thus indicating weathering of minerals in tills derived from the local biotite-sanadine-hornblende tuffs. The amount of post glacial weathering was estimated based on the relative intensity of the 17[angstrom] smectite peak after ethylene glycol solvation. Both the X-ray and weathering rind analysis show two separate glacial events in Red Mountain Creek valley. However, in the Rio Grande system the weathering rind data suggests two glacial events while the clay mineralogy suggests only one.

  20. Sediment and radionuclide transport in rivers. Phase 3. Field sampling program for Cattaraugus and Buttermilk Creeks, New York

    SciTech Connect (OSTI)

    Ecker, R.M.; Walters, W.H.; Onishi, Y.

    1982-08-01T23:59:59.000Z

    A field sampling program was conducted on Cattaraugus and Buttermilk Creeks, New York during April 1979 to investigate the transport of radionuclides in surface waters as part of a continuing program to provide data for application and verification of Pacific Northwest Laboratory's (PNL) sediment and radionuclide transport model, SERATRA. Bed sediment, suspended sediment and water samples were collected during unsteady flow conditions over a 45 mile reach of stream channel. Radiological analysis of these samples included gamma ray spectrometry analysis, and radiochemical separation and analysis of Sr-90, Pu-238, Pu-239, 240, Am-241 and Cm-244. Tritium analysis was also performed on water samples. Based on the evaluation of radionuclide levels in Cattaraugus and Buttermilk Creeks, the Nuclear Fuel Services facility at West Valley, New York, may be the source of Cs-137, Sr-90, Cs-134, Co-60, Pu-238, Pu-239, 240, Am-241, Cm-244 and tritium found in the bed sediment, suspended sediment and water of Buttermilk and Cattaraugus Creeks. This field sampling effort was the last of a three phase program to collect hydrologic and radiologic data at different flow conditions.

  1. Analysis of dust samples collected from spent nuclear fuel interim storage containers at Hope Creek, Delaware, and Diablo Canyon, California.

    SciTech Connect (OSTI)

    Bryan, Charles R.; Enos, David George

    2014-07-01T23:59:59.000Z

    Potentially corrosive environments may form on the surface of spent nuclear fuel dry storage canisters by deliquescence of deposited dusts. To assess this, samples of dust were collected from in-service dry storage canisters at two near-marine sites, the Hope Creek and Diablo Canyon storage installations, and have been characterized with respect to mineralogy, chemistry, and texture. At both sites, terrestrially-derived silicate minerals, including quartz, feldspars, micas, and clays, comprise the largest fraction of the dust. Also significant at both sites were particles of iron and iron-chromium metal and oxides generated by the manufacturing process. Soluble salt phases were minor component of the Hope Creek dusts, and were compositionally similar to inland salt aerosols, rich in calcium, sulfate, and nitrate. At Diablo Canyon, however, sea-salt aerosols, occurring as aggregates of NaCl and Mg-sulfate, were a major component of the dust samples. The seasalt aerosols commonly occurred as hollow spheres, which may have formed by evaporation of suspended aerosol seawater droplets, possibly while rising through the heated annulus between the canister and the overpack. The differences in salt composition and abundance for the two sites are attributed to differences in proximity to the open ocean and wave action. The Diablo Canyon facility is on the shores of the Pacific Ocean, while the Hope Creek facility is on the shores of the Delaware River, several miles from the open ocean.

  2. LEGAL BUSINESS NAME AND DBA NAME (as applicable) PERSON OR SOLE PROPRIETOR -ENTER FULL NAME HERE (Last, First) (REQUIRED) PERMANENT BUSINESS Address-(number & Street or P.O. Box) (REQUIRED) PERMANENT REMITTANCE Address (if different from Business Address)

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    LEGAL BUSINESS NAME AND DBA NAME (as applicable) PERSON OR SOLE PROPRIETOR -ENTER FULL NAME HERE (Last, First) (REQUIRED) PERMANENT BUSINESS Address- (number & Street or P.O. Box) (REQUIRED) PERMANENT REMITTANCE Address (if different from Business Address) (OPTIONAL) CAMPUS MAIL STOP (Complete ONLY after

  3. RESOLUTION TO APPROVE A PROPOSAL TO ESTABLISH A MNOA ASSESSMENT COMMITTEE AS A PERMANENT

    E-Print Network [OSTI]

    and uses for assessment of student learning at Mnoa. c) Review assessment resource needs and recommendRESOLUTION TO APPROVE A PROPOSAL TO ESTABLISH A MNOA ASSESSMENT COMMITTEE AS A PERMANENT COMMITTEE OF THE MANOA FACULTY SENATE (January 21, 2009) WHEREAS the purpose of the Mnoa Assessment Committee (MAC

  4. Optimal Halbach permanent magnet designs for maximally pulling and pushing nanoparticles

    E-Print Network [OSTI]

    Shapiro, Benjamin

    Optimal Halbach permanent magnet designs for maximally pulling and pushing nanoparticles A. Sarwar Stewart School of Industrial and Systems Engineering (ISyE), Georgia Institute of Technology, USA a r t i Available online 19 September 2011 Keywords: Magnetic nanoparticle Targeted drug deliver Magnetic drug

  5. Modular Permanent Magnet Machine Based on Soft Magnetic *** Burgess-Norton Mfg.Co.

    E-Print Network [OSTI]

    Lipo, Thomas

    2005-30 Modular Permanent Magnet Machine Based on Soft Magnetic Composite *** Burgess-Norton Mfg of Wisconsin-Madison College of Engineering Wisconsin Power Electronics Research Center 2559D Engineering Hall 1415 Engineering Drive Madison, WI 53706-1691 © 2005 Confidential Research Report W. Ouyang*, S. Huang

  6. Origin and Phylogeny of Microbes Living in Permanent Antarctic Lake Ice

    E-Print Network [OSTI]

    Priscu, John C.

    Origin and Phylogeny of Microbes Living in Permanent Antarctic Lake Ice D. A. Gordon,1, * J. Priscu of bacteria and cyanobacteria colonizing sediment particles in the per- manent ice cover of an Antarctic lake collected from a depth of 2.5 m in the 4-m-thick ice cover of Lake Bonney, McMurdo Dry Valleys, Antarctica

  7. Aprovaci de l'oferta de formaci permanent del curs 2013-14 (cursos pendents)

    E-Print Network [OSTI]

    Yannuzzi Sanchez, Marcelo

    de juliol de 2014 #12;PROGRAMES DE FORMACI� PERMANENT DE POSTGRAU. CURS 2013-14. ARQUITECTURA Edició Lloc d'impartició Aprovació Arquitectura del Paisatge Departament d'Urbanisme i Ordenació del Territori 31 Barcelona CG 58/7 2013 Arquitectura i Medi Ambient: Integració d'Energies Renovables a l'Arquitectura

  8. OFERTA DE PROGRAMES DE FORMACI PERMANENT DEL CURS ACADMIC 2011/12

    E-Print Network [OSTI]

    Politècnica de Catalunya, Universitat

    OFERTA DE PROGRAMES DE FORMACI� PERMANENT CURS 2011-12 ARQUITECTURA, EDIFICACI� I URBANISME Màster Nom'impartició Arquitectura del Paisatge * Departament d'Urbanisme i Ordenació del Territori 29 Barcelona i Milà Arquitectura i Medi Ambient: Integració d'Energies Renovables a l'Arquitectura * Departament de Construccions

  9. Performance Comparison of Three-and Five-Phase Permanent Magnet Generators for Marine Current

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Turbine Applications Under Open-Circuit Faults Seifeddine Benelghali, Fatiha Mekri, Mohamed Benbouzid a marine current turbine and compared to a classical three-phase generator. For both topologies, a robust generators key features marine applications. Index Terms--Marine Current Turbine MCT), five-phase Permanent

  10. Pulsating Torque Reduction for Permanent Magnet Bojan Grcar, Peter Cafuta, Gorazd Stumberger

    E-Print Network [OSTI]

    Stankoviæ, Aleksandar

    vibration and acoustic noise which may be even amplified in variable speed drives when the torque frequencyPulsating Torque Reduction for Permanent Magnet AC Motors Bojan Grcar, Peter Cafuta, Gorazd motors are discussed in the paper. The pulsation torque is a consequence of the non-sinusoidal flux

  11. AN ISSUE OF PERMANENCE: ASSESSING THE EFFECTIVENESS OF TEMPORARY CARBON STORAGE

    E-Print Network [OSTI]

    with a `leaky' carbon sequestration reservoir, we argue that this is an issue that applies to just about all that the value of relatively deep ocean carbon sequestration can be nearly equivalent to permanent sequestration gases using carbon sequestration technologies (Herzog et al., 2000; Herzog, 2001) is being proposed

  12. Permanence Discounting for Land-Based Carbon Sequestration Man-Keun Kim

    E-Print Network [OSTI]

    McCarl, Bruce A.

    Permanence Discounting for Land-Based Carbon Sequestration By Man-Keun Kim Post Doctoral Fellow Discounting for Land-Based Carbon Sequestration 1. Introduction Land-based soil carbon sequestration has been explored the potential of land-based carbon sequestration strategies in the US such as afforestation

  13. Permanent Closure of MFC Biodiesel Underground Storage Tank 99ANL00013

    SciTech Connect (OSTI)

    Kerry L. Nisson

    2012-10-01T23:59:59.000Z

    This closure package documents the site assessment and permanent closure of the Materials and Fuels Complex biodiesel underground storage tank 99ANL00013 in accordance with the regulatory requirements established in 40 CFR 280.71, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.”

  14. HIGH-SPEED AXIAL-FLUX PERMANENT MAGNET MICROMOTORS WITH ELECTROPLATED WINDINGS

    E-Print Network [OSTI]

    the other. The folded-coil stator fabrication process is detailed, followed by the motor driver topology- plated multi-phase stator windings and their use in a high-speed permanent magnet micromotor. As the stator windings of an axial- flux micromotor, both single-plated folded coils, and two-layer double

  15. Discharge Oscillations in a Permanent Magnet Cylindrical Hall-Effect Thruster

    E-Print Network [OSTI]

    circuit leaves very little room for magnetic pole pieces and heat shields. Propulsion Research EngineerDischarge Oscillations in a Permanent Magnet Cylindrical Hall-Effect Thruster IEPC-2009-122 Presented at the 31st International Electric Propulsion Conference, Ann Arbor, MI September 20-24, 2009 K

  16. Wireless Control of Magnetic Helical Microrobots using a Rotating-Permanent-Magnet Manipulator

    E-Print Network [OSTI]

    Bamberg, Stacy Morris

    ]. Helical propulsion using magnetic fields is particularly promising for medical microrobots. HelicalWireless Control of Magnetic Helical Microrobots using a Rotating-Permanent-Magnet Manipulator Thomas W. R. Fountain, Prem V. Kailat, and Jake J. Abbott Abstract-- Magnetic helical medical microrobots

  17. A Fault-Tolerant Multiphase Permanent Magnet Generator for Marine Current Turbine Applications

    E-Print Network [OSTI]

    Boyer, Edmond

    A Fault-Tolerant Multiphase Permanent Magnet Generator for Marine Current Turbine Applications on offshore wind turbine systems. Marine current turbines are characterized by a very difficult access feature. This paper deals with the use of a PM multiphase marine current turbine generator. With this kind

  18. Method and apparatus for sensorless operation of brushless permanent magnet motors

    DOE Patents [OSTI]

    Sriram, Tillasthanam V. (Carmel, IN)

    1998-01-01T23:59:59.000Z

    A sensorless method and apparatus for providing commutation timing signals for a brushless permanent magnet motor extracts the third harmonic back-emf of a three-phase stator winding and independently cyclically integrates the positive and negative half-cycles thereof and compares the results to a reference level associated with a desired commutation angle.

  19. Permanent shadow in simple craters near the lunar poles D. Ben J. Bussey,1

    E-Print Network [OSTI]

    Spudis, Paul D.

    Planetology: Solid Surface Planets: Remote sensing; 6250 Planetology: Solar System Objects: Moon (1221, such as the floors of impact craters, may be in permanent shadow, whilst high areas may receive near constant solar. A second data set that exists is topography derived from stereo analysis of Clementine UVVIS images [Cook

  20. High speed internal permanent magnet machine and method of manufacturing the same

    DOE Patents [OSTI]

    Alexander, James Pellegrino (Ballston Lake, NY); EL-Refaie, Ayman Mohamed Fawzi (Niskayuna, NY); Lokhandwalla, Murtuza (Clifton Park, NY); Shah, Manoj Ramprasad (Latham, NY); VanDam, Jeremy Daniel (West Coxsackie, NY)

    2011-09-13T23:59:59.000Z

    An internal permanent magnet (IPM) machine is provided. The IPM machine includes a stator assembly and a stator core. The stator core also includes multiple stator teeth. The stator assembly is further configured with stator windings to generate a magnetic field when excited with alternating currents and extends along a longitudinal axis with an inner surface defining a cavity. The IPM machine also includes a rotor assembly and a rotor core. The rotor core is disposed inside the cavity and configured to rotate about the longitudinal axis. The rotor assembly further includes a shaft. The shaft further includes multiple protrusions alternately arranged relative to multiple bottom structures provided on the shaft. The rotor assembly also includes multiple stacks of laminations disposed on the protrusions and dovetailed circumferentially around the shaft. The rotor assembly further includes multiple permanent magnets for generating a magnetic field, which interacts with the stator magnetic field to produce torque. The permanent magnets are disposed between the stacks. The rotor assembly also includes multiple bottom wedges disposed on the bottom structures of the shaft and configured to hold the multiple stacks and the multiple permanent magnets.

  1. Method and apparatus for sensorless operation of brushless permanent magnet motors

    DOE Patents [OSTI]

    Sriram, T.V.

    1998-04-14T23:59:59.000Z

    A sensorless method and apparatus for providing commutation timing signals for a brushless permanent magnet motor extracts the third harmonic back-emf of a three-phase stator winding and independently cyclically integrates the positive and negative half-cycles thereof and compares the results to a reference level associated with a desired commutation angle. 23 figs.

  2. Design of optimal digital controller for stable super-high-speed permanent-magnet synchronous

    E-Print Network [OSTI]

    Wu, Thomas

    collaborative design scheme of a super-high-speed permanent-magnet synchronous motor (PMSM) and its digital stability and performance. Since the systematic design of the PMSM can ensure its stability over the full the efficiency and performance of the PMSM. The unique feature in the proposed optimal V/f control is its design

  3. Multi-criteria based design approach of multiphase permanent magnet low speed synchronous machines

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    dedicated to multiphase Permanent Magnet Synchronous Machines (PMSM) supplied by Pulse Width Modulation to use PWM VSI for supplying high power propulsion machines [1]. The induction machines and the PMSM can be easily considered in this instance since the constraint on the reactive power does not apply [2]. PMSM

  4. A Robust Hybrid Current Control for Permanent Magnet Synchronous Motor Drive

    E-Print Network [OSTI]

    Boyer, Edmond

    --Recently, the Permanent Magnet Synchronous Motor (PMSM) find a widespread utilization in modern adjustable AC drives. Comparisons using simulations on a 0.9-kW PMSM confirm that the proposed hybrid current controller gives of the stator current, obtained by using a fast Fourier transform, are used for comparison purposes. Index Terms--PMSM

  5. Abstract--Linear electrical loading system (LELS) driven by electrical cylinder with permanent magnet synchronous

    E-Print Network [OSTI]

    Yao, Bin

    magnet synchronous motor (PMSM) offers several advantages of high transmission efficiency and high cylinder driven by permanent magnet synchronous motor (PMSM). Though direct-drive linear motors has some to direct-drive linear motor, the solution of electrical cylinder with PMSM has larger output force

  6. Direct torque control of permanent magnet synchronous motors with non-sinusoidal back-EMF

    E-Print Network [OSTI]

    Ozturk, Salih Baris

    2009-05-15T23:59:59.000Z

    torque control of permanent magnet synchronous motor (PMSM) with sinusoidal back-EMF is discussed in detail. Secondly, the proposed two-phase conduction mode for DTC of BLDC motors is introduced in the constant torque region. In this control scheme, only...

  7. Parameter estimation of permanent magnet stepper motors without position or velocity sensors

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    theory I. INTRODUCTION Permanent Magnet Stepper Motors (PMSM's) are widely used in industry for position control, especially in manu- facturing applications. PMSM's are more robust than brush DC motors the question of parameter identification without position or velocity sensors. The es- timation of PMSM

  8. Residual-oil-saturation-technology test, Bell Creek Field, Montana. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-06-01T23:59:59.000Z

    A field test was conducted of the technology available to measure residual oil saturation following waterflood secondary oil recovery processes. The test was conducted in a new well drilled solely for that purpose, located immediately northwest of the Bell Creek Micellar Polymer Pilot. The area where the test was conducted was originally drilled during 1968, produced by primary until late 1970, and was under line drive waterflood secondary recovery until early 1976, when the area was shut in at waterflood depletion. This report presents the results of tests conducted to determine waterflood residual oil saturation in the Muddy Sandstone reservoir. The engineering techniques used to determine the magnitude and distribution of the remaining oil saturation included both pressure and sidewall cores, conventional well logs (Dual Laterolog - Micro Spherically Focused Log, Dual Induction Log - Spherically Focused Log, Borehole Compensated Sonic Log, Formation Compensated Density-Compensated Neutron Log), Carbon-Oxygen Logs, Dielectric Logs, Nuclear Magnetism Log, Thermal Decay Time Logs, and a Partitioning Tracer Test.

  9. Results of the PDF{trademark} test burn at Clifty Creek Station

    SciTech Connect (OSTI)

    Johnson, S.A.; Knottnerus, B.

    1996-10-01T23:59:59.000Z

    Process Derived Fuel (PDF{sup TM}) from the ENCOAL process is different from other coals used to generate steam for the power industry. Although PDF{sup TM} is currently produced from Powder River Basin (PRB) subbituminous coal, the coal structure changes during processing. Compared to the parent coal, PDF{sup TM} contains much less moisture and slightly lower volatile matter resulting in a higher heating value and higher ash per million Btu. These coal properties can potentially benefit utility boiler performance. Combining the high combustion reactivity typical of PRB coals with significantly reduced moisture should produce higher flame zone temperatures and shorter flames. As a result, some boilers may experience increased steam production, better burnout, or lower excess air. The objective of the work contracted to Quinapoxet Engineering was to quantify the impacts of burning PDF{sup TM} on boiler performance at Clifty Creek Unit 3. A unique optical temperature monitor called SpectraTemp was used to measure changes in furnace exit gas temperature (FEGT) with time and boiler operating parameters for both PDF{sup TM} blends as well as a baseline coal blend consisting of 60% PRB coal, 20% Ohio coal, and 20% low-volatile eastern bituminous coal from Virginia. FEGT was then related to net plant heat rate, NO{sub x} emissions, and electrostatic precipitator performance.

  10. North Blowhorn Creek oil field - a stratigraphic trap in Black Warrior basin of Alabama

    SciTech Connect (OSTI)

    Bearden, B.L.; Mancini, E.A.; Reeves, P.R.

    1984-04-01T23:59:59.000Z

    The Black Warrior basin of northwestern Alabama contains shallow oil and gas prospects. To date more than 1000 wells have been drilled in the region and more than 90 petroleum fields and pools have been discovered. Mississippian sandstone reservoirs are the most productive horizons for hydrocarbons in the basin, and the Carter sandstone is the most prolific. Identification of stratigraphic traps will enhance petroleum exploration by delineating sand body geometry. Definition reservoir thickness and extent is critical for identifying successful prospects. The North Blowhorn Creek field in Lamar County, Alabama, which produces from the Carter sandstone, is a prime example of a stratigraphic trap. As of March 1983, this field has produced a total of 657,678 bbl of oil and 972,3 mmcf of gas. The Carter sandstone there was deposited as part of a delta which prograded from northwest to southeast across the Black Warrior basin of Alabama. Primary and secondary porosity in the Carter sandstone ranges from 10 to 16% with an average of 13.5%. Permeability ranges from approximately .01-29 md with an average of 10 md. The Parkwood shales interbedded with the Carter sandstone are probably the primary petroleum source beds of the Mississippian hydrocarbons.

  11. Mechanisms for groundwater contamination by UCG: preliminary conclusions from the Hoe Creek study

    SciTech Connect (OSTI)

    Wang, F.T.; Mead, S.W.; Stuermer, D.H.

    1982-08-03T23:59:59.000Z

    We have monitored groundwater quality changes in approximately 60 wells constructed near the 3 underground coal gasification (UCG) experiments carried out at our Hoe Creek site in northeastern Wyoming. A broad range of residual gasification products are introduced into the groundwater system as a result of the UCG process. These groundwater contaminants may be of environmental significance if they find their way, in sufficient concentrations, into surface waters or aquifers from which water is extracted for drinking or agricultural purposes. In seeking to identify effective control technologies or mitigation measures, we have found it important to investigate the mechanisms responsible for the formation and dispersal of the contaminants. For example, an important mechanism for the production of organic contaminants may be pyrolysis reactions along the surfaces of cracks through which hot product gases escape from the cavity during gasification. As gasification continues, these pyrolysis products will be distilled further out in the surrounding coal and deposited on the coal surfaces. Other mechanisms that are believed to be important are post-burn pyrolysis as a result of residual cavity heat and the liberation of minerals from the coal by the action of dissolved CO/sub 2/.

  12. Results from the third LLL underground coal gasification experiment at Hoe Creek

    SciTech Connect (OSTI)

    Hill, R.W.; Thorsness, C.B.; Cena, R.J.; Aiman, W.R.; Stephens, D.R.

    1980-05-20T23:59:59.000Z

    A major objective of the US Energy Program is the development of processes to produce clean fuels from coal. Underground coal gasification is one of the most promising of these processes. If successful, underground coal gasification (UCG) would quadruple the proven reserves of the US coal. Cost for products produced from UCG are projected to be 65 to 75% of those from conventional coal conversion. Finally, UCG appears to possess environmental advantages since no mining is involved and there are less solid wastes produced. In this paper we describe results from the Hoe Creek No. 3 underground coal gasification test. The experiment employed a drilled channel between process wells spaced 130' apart. The drilled channel was enlarged by reverse combustion prior to forward gasification. The first week of forward gasification was carried out using air injection, during which 250 tons of coal were consumed yielding an average dry product gas heating value of 114 Btu/scf. Following this phase, steam and oxygen were injected (generally a 50-50 mixture) for 47 days, during which 3945 tons of coal were consumed at an average rate of 84 tons of coal per day and an average dry gas heating value of 217 Btu/scf. The average gas composition during the steam-oxygen phase was 37% H/sub 2/, 5% CH/sub 4/, 11% CO, and 44% CO/sub 2/. Gas recovery was approximately 82% during the test, and the average thermochemical efficiency was near 65%.

  13. IEEE TRANSACTIONS ON MAGNETICS, VOL. 42, NO. 7, JULY 2006 1861 Analytical Design of Permanent-Magnet

    E-Print Network [OSTI]

    Mi, Chunting "Chris"

    IEEE TRANSACTIONS ON MAGNETICS, VOL. 42, NO. 7, JULY 2006 1861 Analytical Design of Permanent-Magnet Traction-Drive Motors Chunting Chris Mi Department of Electrical and Computer Engineering, University of Michigan, Dearborn, MI 48128 USA This paper presents an analytical method for the design of permanent-magnet

  14. Legal Business Name and DBA Name (as applicable) Permanent Business Address (number & street or P.O. Box) (Required)

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    Legal Business Name and DBA Name (as applicable) Permanent Business Address (number & street or P) Permanent Remittance (Address (if different from Business Address) (Required) City, State and Zip code Email, Santa Cruz Payee Setup Request (204) Required in lieu of IRS W-9 when doing business with the State

  15. DEMOCRACY IN THE MUSEUM. THE FOUNDATION AND PERMANENT EXHIBITION OF THE MUSEO ADOLFO SUREZ Y LA TRANSICIN

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 DEMOCRACY IN THE MUSEUM. THE FOUNDATION AND PERMANENT EXHIBITION OF THE MUSEO ADOLFO SUÁREZ Y LA TRANSICI�N Jurek Sehrt, Museum of Film and Television in Berlin E-mail: js@sehrt.de Tobias Reckling article: Reckling, T. & Sehrt, J. (2013), `Democracy in the Museum. The foundation and permanent

  16. ''Heat Transfer at the Mold-Metal Interface in Permanent Mold Casting of Aluminum Alloys'' Final Project Report

    SciTech Connect (OSTI)

    Professor R. D. Pehlke, Principal Investigator, Dr. John M. Cookson, Dr. Shouwei Hao, Dr. Prasad Krishna, Kevin T. Bilkey

    2001-12-14T23:59:59.000Z

    This project on heat transfer coefficients in metal permanent mold casting has been conducted in three areas. They are the theoretical study at the University of Michigan, the experimental investigation of squeeze casting at CMI-Tech Center (Now Hayes-Lemmerz Technical Center) and the experimental investigation of low pressure permanent mold casting at Amcast Automotive.

  17. REPM'10 -Proceedings of the 21st Workshop on Rare-Earth Permanent Magnets and their Applications

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    86 Permanent Magnet Sources for Magnetic Refrigeration J. ROUDAUT1 , J.-P. YONNET1 , A. KEDOUS for magnetic refrigeration but it remains difficult to compare their performance. To overcome this issue some to the set of performance criteria. Key words: permanent magnets, magnetic refrigeration, magnetocaloric

  18. Flow Characteristics Analysis of Widows' Creek Type Control Valve for Steam Turbine Control

    SciTech Connect (OSTI)

    Yoo, Yong H.; Sohn, Myoung S.; Suh, Kune Y. [PHILOSOPHIA, Inc., Seoul National University, San 56-1 Sillim-dong, Gwanak-gu, Seoul, 151-742 (Korea, Republic of)

    2006-07-01T23:59:59.000Z

    The steam turbine converts the kinetic energy of steam to mechanical energy of rotor blades in the power conversion system of fossil and nuclear power plants. The electric output from the generator of which the rotor is coupled with that of the steam turbine depends on the rotation velocity of the steam turbine bucket. The rotation velocity is proportional to the mass flow rate of steam entering the steam turbine through valves and nozzles. Thus, it is very important to control the steam mass flow rate for the load following operation of power plants. Among various valves that control the steam turbine, the control valve is most significant. The steam flow rate is determined by the area formed by the stem disk and the seat of the control valve. While the ideal control valve linearly controls the steam mass flow rate with its stem lift, the real control valve has various flow characteristic curves pursuant to the stem lift type. Thus, flow characteristic curves are needed to precisely design the control valves manufactured for the operating conditions of nuclear power plants. OMEGA (Optimized Multidimensional Experiment Geometric Apparatus) was built to experimentally study the flow characteristics of steam flowing inside the control valve. The Widows' Creek type control valve was selected for reference. Air was selected as the working fluid in the OMEGA loop to exclude the condensation effect in this simplified approach. Flow characteristic curves were plotted by calculating the ratio of the measured mass flow rate versus the theoretical mass flow rate of the air. The flow characteristic curves are expected to be utilized to accurately design and operate the control valve for fossil as well as nuclear plants. (authors)

  19. June 8 and 9, 2012 marked the first BioBlitz, put on by the University of Minnesota's Bell Museum of Natural History, to be held at Cedar Creek. Species surveyors and interested public started rolling in at 5 p.m. on Friday the

    E-Print Network [OSTI]

    Minnesota, University of

    Museum of Natural History, to be held at Cedar Creek. Species surveyors and interested public started five hours. With nearly every highway leading to Cedar Creek under construction and temperatures, with 11 new records for the county and 26 new records for Cedar Creek More information on the Bell Museum

  20. Second report on the Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect (OSTI)

    Loar, J.M. [ed.] [ed.; Adams, S.M.; Bailey, R.D.; Blaylock, B.G.; Boston, H.L.; Cox, D.K.; Huston, M.A.; Kimmel, B.L.; Loar, J.M.; Olsen, C.R.; Ryon, M.G.; Shugart, L.R.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.; Walton, B.T.; Talmage, S.S.; Murphy, J.B.; Valentine, C.K. [Oak Ridge National Lab., TN (United States)] [Oak Ridge National Lab., TN (United States); Appellanis, S.M.; Jimenez, B.D. [Puerto Rico Univ., San Juan (Puerto Rico)] [Puerto Rico Univ., San Juan (Puerto Rico); Huq, M.V. [Connecticut Dept. of Environmental Protection, Hamden, CT (United States)] [Connecticut Dept. of Environmental Protection, Hamden, CT (United States); Meyers-Schone, L.J. [Frankfurter, Gross-Gerau (Germany)] [Frankfurter, Gross-Gerau (Germany); Mohrbacher, D.A. [Automated Sciences Group, Inc., Oak Ridge, TN (United States)] [Automated Sciences Group, Inc., Oak Ridge, TN (United States); Olsen, C.R. [USDOE Office of Energy Research, Washington, DC (United States). Environmental Sciences Div.] [USDOE Office of Energy Research, Washington, DC (United States). Environmental Sciences Div.; Stout, J.G. [Cincinnati Univ., OH (United States)] [Cincinnati Univ., OH (United States)

    1992-12-01T23:59:59.000Z

    As a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC); selected tributaries of WOC, including Fifth Creek, First Creek, Melton Branch, and Northwest Tributary; and the Clinch River. BMAP consists of seven major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs on-site and the aquatic environs off-site. These tasks are (1) toxicity monitoring; (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota; (3) biological indicator studies; (4) instream ecological monitoring; (5) assessment of contaminants in the terrestrial environment; (6) radioecology of WOC and White Oak Lake (WOL); and (7) contaminant transport, distribution, and fate in the WOC embayment-Clinch River-Watts Bar Reservoir system. This document, the second of a series of annual reports, described the results of BMAP studies conducted in 1987.