Powered by Deep Web Technologies
Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

CX-007358: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Categorical Exclusion Determination Integration of the University of Oregon's Cogeneration Project CX(s) Applied: B1.7 Date: 12012011 Location(s): Oregon Offices(s):...

2

CX-010434: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to add equipment at its LaPine Substation in Deschutes...

3

CX-007361: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Ashe-Marion #2 Spacer Replacements CX(s) Applied: B1.3 Date: 11/29/2011 Location(s): Oregon, Oregon, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration

4

CX-012369: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

North Bend District Wood Pole Replacements 2014 CX(s) Applied: B1.3 Date: 05/09/2014 Location(s): Oregon, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

5

EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental  

Broader source: Energy.gov [DOE]

This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

6

CX-008685: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Big Eddy – Troutdale No. 1 230 Kilovolt Transmission Line Upgrade CX(s) Applied: B4.13 Date: 07/11/2012 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

7

CX-012192: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Fiscal Year 2014 Communication Site Engine Generator Replacements CX(s) Applied: B1.3 Date: 05/05/2014 Location(s): Oregon, Oregon, Washington, Oregon Offices(s): Bonneville Power Administration

8

CX-012005: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

2014 Alvey District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 04/28/2014 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

9

CX-010344: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Alvey District Wood Poles CX(s) Applied: B1.3 Date: 05/09/2013 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

10

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

11

CX-010338: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Eugene Substation Fiber Interconnection CX(s) Applied: B4.7 Date: 05/21/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

12

CX-010435: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

De Moss Substation Expansion CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

13

CX-011239: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Security Upgrades at Multiple Substations CX(s) Applied: ? Date: 10/02/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration

14

CX-011530: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Location(s): Oregon, Washington Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to install equipment in the existing Ostrander and Pearl...

15

CX-011182: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

09052013 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneveille Power Administration (BPA) proposes to install equipment and fund upgrades in Portland...

16

CX-011237: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Lightspeed Networks Inc. Fiber Installation CX(s) Applied: B4.9 Date: 10/24/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

17

CX-010422: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Mt. Richmond Property Funding CX(s) Applied: B1.25 Date: 06/10/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

18

CX-010578: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Celilo Converter Station Upgrades CX(s) Applied: B4.11 Date: 07/25/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

19

CX-009707: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Alcoa Power Sales Contract CX(s) Applied: B4.1 Date: 12/04/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration

20

CX-008677: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Columbia and Willamette River Crossings Liquefaction Hazard Assessment CX(s) Applied: B3.1 Date: 07/23/2012 Location(s): Oregon, Oregon, Washington, Washington Offices(s): Bonneville Power Administration

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

CX-012227: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Alcoa Digital Upgrade in Oregon and Washington CX(s) Applied: B4.7 Date: 06/19/2014 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration

22

CX-010164: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

2013 Spacer and Insulator Replacement Program: First and Second Quarter Projects CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): Oregon, Oregon, Washington, Montana, Montana Offices(s): Bonneville Power Administration

23

CX-011690: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Equipment and Property Transfers with Three Public Utilities in Oregon, Idaho and Washington CX(s) Applied: B1.124 Date: 12/26/2013 Location(s): Oregon, Idaho, Washington Offices(s): Bonneville Power Administration

24

CX-011752: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Oregon State University - Bio-Lamina-Plates Bioreactor for Enhanced Mass and Heat Transfer CX(s) Applied: B3.6 Date: 11/14/2013 Location(s): Oregon Offices(s): Advanced Research Projects Agency-Energy

25

CX-008715: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

2012 Alvey District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

26

CX-011693: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

CX(s) Applied: B1.7 Date: 12302013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to install...

27

CX-010161: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Buckley-Marion Overhead Groundwire Replacement Project CX(s) Applied: B1.3 Date: 03/20/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

28

CX-010162: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Revenue Meter Replacement at Oregon Trail Electric Co-op’s (OTEC's) West John Day Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

29

CX-011994: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Marion-Alvey Marion-Lane Insulator Replacement Project CX(s) Applied: B1.3 Date: 04/07/2014 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

30

Oregon Agriculture and the Economy  

E-Print Network [OSTI]

Oregon Agriculture and the Economy: An Update Oregon State University Extension Service Rural Analyst Department of Agricultural and Resource Economics Oregon State University #12;Contents ...........................................................................................................................................12 Agricultural Support Services, Wholesale Trade, Transportation and Warehousing, Retail Trade

Tullos, Desiree

31

Port of Morrow, Oregon  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

wind energy projects in Wyoming, Oregon, and Washington and small amounts of power from solar photovoltaic projects. Bonneville also has contracted to purchase 49.9 megawatts...

32

Energy Trust of Oregon  

Broader source: Energy.gov [DOE]

Oregon's 1999 electric-utility restructuring legislation (SB 1149) required Pacific Power and Portland General Electric (PGE) to collect a 3% public-purpose charge from their customers to support...

33

CX-010213: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Wave Energy Technology- New Zealand Multi-Mode Wave Energy Converter Advancement Project CX(s) Applied: A9 Date: 01/08/2013 Location(s): Hawaii, Oregon Offices(s): Golden Field Office

34

CX-011804: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Building 26 FSARS CX(s) Applied: B1.3, Facility operation and maintenance Date: 01/28/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory

35

CX-011186: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Fiscal Year 2014 Technology Innovation Portfolio CX(s) Applied: B5.1, B3.6 Date: 08/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

36

CX-012225: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

PAC-CAISO Energy Imbalance Market Agreement CX(s) Applied: B4.8 Date: 06/24/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

37

CX-010787: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

CX(s) Applied: B3.1, B6.1 Date: 08142013 Location(s): Oregon Offices(s): National Energy Technology Laboratory Removal of suspected contaminated soil and associated piping...

38

CX-012003: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

John Day Powerhouse-John Day Number 1-4 Conductor Replacements CX(s) Applied: B1.3 Date: 04/25/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

39

CX-011469: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Severe Environment Corrosion Erosion Research Facility (SECERF) CX(s) Applied: B3.6 Date: 10/29/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory

40

CX-008881: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Disposition of Mountain Avenue Tap Line Sectionalizing Switches CX(s) Applied: B1.24 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

CX-008686: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Disposition of Mountain Avenue Substation and Tap Line CX(s) Applied: B1.24 Date: 07/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

42

CX-011124: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Technology Innovations to Improve Biomass Cookstoves to Meet Tier 4 Standards CX(s) Applied: A9, B3.6 Date: 08/21/2013 Location(s): Oregon Offices(s): Golden Field Office

43

CX-011171: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Longview and Tillamook Substation Communication Upgrades CX(s) Applied: B1.7 Date: 09/24/2013 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration

44

CX-008169: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Integration of the Echo Point Community Wind Generation Project CX(s) Applied: B1.7 Date: 03/20/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

45

CX-010347: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Exclusion Determination Franklin-Badger Canyon 2 & Walla Walla-Pendleton 1 Wood Poles CX(s) Applied: B1.3 Date: 04302013 Location(s): Washington, Oregon Offices(s):...

46

CX-010593: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Determination CX-010593: Categorical Exclusion Determination Pilot Butte-La Pine 1 Wood Pole Replacements CX(s) Applied: B1.3 Date: 06132013 Location(s): Oregon Offices(s):...

47

CX-010954: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Hydrate Evolution in Response to Ongoing Environmental Shifts CX(s) Applied: A9 Date: 09/17/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory

48

CX-007357: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Transition the Umatilla Coho Production Program to a Local Broodstock Program CX(s) Applied: B1.20 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration

49

CX-008692: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Amendment Number 2 to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 06/22/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration

50

CX-008892: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Short-term Additional Amendments to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 07/23/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration

51

CX-009201: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Short-term Additional Amendments to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 09/14/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration

52

CX-008710: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Amendment Number 1 to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 05/23/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration

53

CX-008933: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Exclusion Determination CX-008933: Categorical Exclusion Determination Building 22 Electrical Upgrades CX(s) Applied: B2.5, B4.6 Date: 08202012 Location(s): Oregon Offices(s):...

54

CX-010191: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Determination CX-010191: Categorical Exclusion Determination Site Arc Flash Electrical Upgrades CX(s) Applied: B1.3, B2.5 Date: 04162013 Location(s): Oregon Offices(s):...

55

CX-008212: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Development of Project on North Unit Irrigation District's Main Canal at Monroe Drop CX(s) Applied: A9 Date: 04/11/2012 Location(s): Oregon Offices(s): Golden Field Office

56

CX-011685: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

CX(s) Applied: B4.7 Date: 01152014 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to allow Lightspeed...

57

CX-009451: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Educational Outreach: Energy Conservation and Materials Properties CX(s) Applied: A9, A11 Date: 11/02/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory

58

CX-012364: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Swan Lake Point Radio Station Project CX(s) Applied: B1.19 Date: 05/22/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

59

CX-011832: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

McNary Substation Equipment Acquisition CX(s) Applied: B1.24 Date: 01/29/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

60

CX-009788: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Provision of Funds to Acquire a Conservation Easement Over the 310-acre Coyote Creek property. CX(s) Applied: B1.25 Date: 01/23/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

CX-011533: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Upgrade Six Wireless Communication Sites (Clear Creek, Evergreen, Fruit Valley, KSLM, Minnehaha, Popcorn) CX(s) Applied: B1.19 Date: 11/06/2013 Location(s): Oregon, Washington, Washington Offices(s): Bonneville Power Administration

62

CX-012361: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Hood River-Coop Service #1 Access Road Maintenance CX(s) Applied: B1.3 Date: 06/02/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

63

CX-010580: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

McNary Substation Shunt Capacitor Addition CX(s) Applied: B4.6 Date: 07/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

64

CX-012109: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Port Townsend Paper Corporation Power Sales Agreement Amendment CX(s) Applied: B4.1 Date: 04/01/2014 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration

65

CX-011238: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Balancing Authority Area Services Agreement with Port Townsend Paper Corporation CX(s) Applied: B4.1 Date: 10/10/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration

66

CX-008917: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Application of Crunch-Flow to Constrain Present and Past Carbon Fluxes at Gas-Hydrate Bearing Sites CX(s) Applied: A9 Date: 08/29/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory

67

CX-012194: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Santiam Substation 230 Kilovolt Shunt Reactor Replacement CX(s) Applied: B4.11 Date: 05/05/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

68

CX-009706: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Keeler Substation-Control House Expansion CX(s) Applied: B4.11 Date: 12/04/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

69

Oregon: Oregon's Clean Energy Resources and Economy (Brochure)  

SciTech Connect (OSTI)

This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Oregon.

Not Available

2013-03-01T23:59:59.000Z

70

CX-009708: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

FY13 Environmental Drainage Upgrades at Bonneville Power Administration’s Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren Substations CX(s) Applied: B4.6 Date: 12/03/2012 Location(s): Oregon, Montana, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration

71

Oregon Ballast Water Task Force Report on Ballast Water Management in Oregon  

E-Print Network [OSTI]

Oregon Ballast Water Task Force Report on Ballast Water Management in Oregon #12;Oregon Ballast Water Task Force Report on Ballast Water Management in Oregon Prepared for the Oregon State Legislature October 2006 #12;Report on Ballast Water Management in Oregon-2006 Acknowledgements We would like to thank

72

Oregon Climate Assessment Report December 2010  

E-Print Network [OSTI]

- Climate change and agriculture in Oregon"" " " " " 151 Chapter 5 - The potential effects of climate changeOregon Climate Assessment Report December 2010 Oregon Climate Change Research Institute #12;Oregon Climate Assessment Report December 2010 Oregon Climate Change Research Institute Recommended citation

Pierce, Stephen

73

Nanotechnology Commercialization in Oregon  

E-Print Network [OSTI]

Nanotechnology Commercialization in Oregon February 27, 2012 Portland State University Physics Seminar Robert D. "Skip" Rung President and Executive Director #12;2 Nanotechnology Commercialization on "green" nanotechnology and gap fund portfolio company examples #12;3 Goals of the National Nanotechnology

Moeck, Peter

74

Oregon Health & Science University  

E-Print Network [OSTI]

to high-quality health care for all, especially Oregonians. 4. Help meet Oregon's health and science, however, has changed dramatically. National and statewide health care reform alters the ways care, including the changing health care environment, new and disruptive technologies, globalization, changing

Chapman, Michael S.

75

& Education CenterOregon  

E-Print Network [OSTI]

Fourth Ave Building Art Building Science & Education CenterOregon Sustainability Center (planned Hall Lincoln Hall School of Business 5th Ave Cinema East Hall University Technology Services Honors Stratford Building Parkway Science Building 1 Helen Gordon Child Center Science Research & Teaching Center

Caughman, John

76

2012 FALL TERM AT THE OREGON INSTITUTE OF MARINE BIOLOGY  

E-Print Network [OSTI]

2012 FALL TERM AT THE OREGON INSTITUTE OF MARINE BIOLOGY September 24 - December 7, 2012 www.uoregon.edu/~oimb The university's marine biology station at Charleston is an ideal location for the study of marine systems. Many students majoring in marine biology, biology, general science, and environmental science. Field trips

Oregon, University of

77

2013 FALL TERM AT THE OREGON INSTITUTE OF MARINE BIOLOGY  

E-Print Network [OSTI]

2013 FALL TERM AT THE OREGON INSTITUTE OF MARINE BIOLOGY September 30 - December 13, 2013 www.uoregon.edu/~oimb The university's marine biology station at Charleston is an ideal location for the study of marine systems. Many students majoring in marine biology, biology, general science, and environmental science. Field trips

Oregon, University of

78

Oregon Spartina Response Plan Oregon Spartina Response Plan  

E-Print Network [OSTI]

methods. An integrated strategy that includes a combination of management methods is likely to be required of Agriculture By Vanessa Howard, Mary Pfauth, Mark Sytsma, and Dennis Isaacson Center for Lakes and Reservoirs management in Oregon is to prevent the establishment and spread of any Spartina species in Oregon estuaries

79

Biofuels in Oregon and Washington  

E-Print Network [OSTI]

PNNL-17351 Biofuels in Oregon and Washington A Business Case Analysis of Opportunities and Challenges Prepared by Pacific Northwest National Laboratory #12;#12;Biofuels in Oregon and Washington, particularly in light of the recent growth experienced by the biofuels industry in the Midwest. Policymakers

80

Oregon as unspoiled nature: a rhetorical criticism of Oregon's tourism campaign  

E-Print Network [OSTI]

Oregon has suffered dislocating economic and industrial shifts for several years. Because logging and fishing provide less economic support for the state, Oregon is looking to alternative industries including tourism. This thesis examines Oregon...

Loughran, Tamara Kay

2012-06-07T23:59:59.000Z

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Klamath Falls geothermal field, Oregon  

SciTech Connect (OSTI)

Klamath Falls, Oregon, is located in a Known Geothermal Resource Area which has been used by residents, principally to obtain geothermal fluids for space heating, at least since the turn of the century. Over 500 shallow-depth wells ranging from 90 to 2,000 ft (27 to 610 m) in depth are used to heat (35 MWt) over 600 structures. This utilization includes the heating of homes, apartments, schools, commercial buildings, hospital, county jail, YMCA, and swimming pools by individual wells and three district heating systems. Geothermal well temperatures range from 100 to 230{degree}F (38 to 110{degree}C) and the most common practice is to use downhole heat exchangers with city water as the circulating fluid. Larger facilities and district heating systems use lineshaft vertical turbine pumps and plate heat exchangers. Well water chemistry indicates approximately 800 ppM dissolved solids, with sodium sulfate having the highest concentration. Some scaling and corrosion does occur on the downhole heat exchangers (black iron pipe) and on heating systems where the geo-fluid is used directly. 73 refs., 49 figs., 6 tabs.

Lienau, P.J.; Culver, G.; Lund, J.W.

1989-09-01T23:59:59.000Z

82

HEDCO Education Building Eugene, Oregon  

E-Print Network [OSTI]

HEDCO Education Building Eugene, Oregon ASHRAE Level I Energy Audit June 2011 Prepared................................................................................................................................... 6 Energy Audit Procedure and Results.................................................................................................................................................. 18 #12;| ASHRAE Level One Energy Audit3 SUMMARY The HEDCO Education Building is part of the College

Oregon, University of

83

Knight Law Center Eugene, Oregon  

E-Print Network [OSTI]

Knight Law Center Eugene, Oregon ASHRAE Level I Energy Audit June 2011 Prepared for University................................................................................................................................. 6 Energy Audit Procedure and Results.................................................................................................................................................. 22 #12;| ASHRAE Level One Energy Audit3 SUMMARY The William W. Knight Law Center is a four story

Oregon, University of

84

Status of Oregon's Bull Trout.  

SciTech Connect (OSTI)

Limited historical references indicate that bull trout Salvelinus confluentus in Oregon were once widely spread throughout at least 12 basins in the Klamath River and Columbia River systems. No bull trout have been observed in Oregon's coastal systems. A total of 69 bull trout populations in 12 basins are currently identified in Oregon. A comparison of the 1991 bull trout status (Ratliff and Howell 1992) to the revised 1996 status found that 7 populations were newly discovered and 1 population showed a positive or upgraded status while 22 populations showed a negative or downgraded status. The general downgrading of 32% of Oregon's bull trout populations appears largely due to increased survey efforts and increased survey accuracy rather than reduced numbers or distribution. However, three populations in the upper Klamath Basin, two in the Walla Walla Basin, and one in the Willamette Basin showed decreases in estimated population abundance or distribution.

Buchanan, David V.; Hanson, Mary L.; Hooton, Robert M.

1997-10-01T23:59:59.000Z

85

CX-008714: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

86

CX-008720: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) Acquisition of Oregon Trail Electric Cooperative Disconnect Switch at the BPA LaGrande Substation CX(s) Applied: B1.24 Date: 05/16/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

87

Protecting Oregon's Bull Kelp April 14, 2006  

E-Print Network [OSTI]

Protecting Oregon's Bull Kelp April 14, 2006 Megan Mackey Ocean Policy Analyst Pacific Marine........................................................................................... 3 Oregon Kelp Ecology................................................................................3 Effects of Kelp Harvest on Marine Fish and Other Species....................................4

California at Santa Cruz, University of

88

Oregon State University Hatfield Marine Science Center  

E-Print Network [OSTI]

Renewable Energy Center..........7 Oregon Sea Grant.....................................28 B. Federal and State Agencies Environmental Protection Agency...................................29

Tullos, Desiree

89

university of oregon DEPARTMENT OF ART  

E-Print Network [OSTI]

Wanlass 058 #12;#12;The Art MFA program at the University of Oregon fosters creative exploration in areas

90

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

mile of distribution line. Oregon Trail is one of the newest cooperatives in the U.S., having started. In contrast, the Columbia Power Cooperative Association, is a small utility with a very large and rural service territory. Troy Cox is the Manager of the utility, located in Monument, Oregon, a town of 150

91

Strategic Plan 20092013 Oregon State University 1 Oregon State University  

E-Print Network [OSTI]

and safety, renewable energy production, and economically viable natural resource management for the people of Oregon, the nation and the world. This mission is achieved by producing graduates competitive of Sustainable Earth Ecosystems; Improving Human Health and Wellness; and Promoting Economic Growth and Social

Escher, Christine

92

Oregon State University Magruder Hall  

E-Print Network [OSTI]

Summary Building Statistics Project Team SEED Model Results Sustainable Systems Overview Appendix 1 ­ Sustainable Design Score Card Appendix 2 ­ Lease Crutcher Lewis Point Verification #12; Executive a total of 35.50 points as summarized below. State of Oregon Sustainable Design Scorecard Summary

Escher, Christine

93

Oregon State University NUCLEAR ENGINEERING  

E-Print Network [OSTI]

Oregon State University NUCLEAR ENGINEERING 3Year STA-21 2010-2011 School Year Nuclear Engineering & Discrimination (3): NE 451 3 Neutronic Analysis I NE 452 3 Neutronic Analysis II NE 457 2 Nuclear Reactor Lab Western Culture (3): NE 467 4 Nucl Reac Therm Hyd NE 474 4 Nucl Engineering Design I NE 475 4 Nucl

Tullos, Desiree

94

Workforce Development Oregon Academic Research Facilities Research Expertise Oregon was the first statein the U.S. to install photovoltaics on its  

E-Print Network [OSTI]

technologies, and sustainable living, Oregon--and its research universities--have for years been" revolution. Today, with guidance from the Oregon Built Environment & Sustainable Technologies Center (Oregon

Oregon, University of

95

Maywood Industries of Oregon Space Heating Low Temperature Geothermal...  

Open Energy Info (EERE)

Maywood Industries of Oregon Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Maywood Industries of Oregon Space Heating Low Temperature...

96

Energy Department Conditionally Authorizes Oregon LNG to Export...  

Energy Savers [EERE]

Energy Department Conditionally Authorizes Oregon LNG to Export Liquefied Natural Gas Energy Department Conditionally Authorizes Oregon LNG to Export Liquefied Natural Gas July 31,...

97

Oregon: Advancing Technology Readiness: Wave Energy Testing and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Oregon: Advancing Technology Readiness: Wave Energy Testing and Demonstration Oregon: Advancing Technology Readiness: Wave Energy Testing and Demonstration March 6, 2014 - 1:23pm...

98

Better Buildings: Workforce: Spotlight on Portland, Oregon: Making...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Spotlight on Portland, Oregon: Making the Program Work for Contractors Better Buildings: Workforce: Spotlight on Portland, Oregon: Making the Program Work for Contractors...

99

The economics of carbon sequestration in western Oregon forests.  

E-Print Network [OSTI]

??This study considered regional forest policies for sequestering carbon in existing forests in western Oregon. A model of log markets in western Oregon was employed… (more)

Im, Eun Ho

2007-01-01T23:59:59.000Z

100

Oregon State University Hatfield Marine Science Center  

E-Print Network [OSTI]

Renewable Energy Center..........6 Oregon Sea Grant of Biomedical Sciences.....................................23 B. Federal and State Agencies Environmental Protection Agency...................................24 PacificCoastalEcologyBranch, Western Ecology Division

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Oregon State University Hatfield Marine Science Center  

E-Print Network [OSTI]

....................................................... 3 Northwest National Marine Renewable Energy Center..........4 Oregon Sea Grant.....................................21 B. Federal and State Agencies Environmental Protection Agency PacificCoastalEcologyBranch, Western

102

,"Oregon Natural Gas Gross Withdrawals and Production"  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Oregon Natural Gas Gross Withdrawals and Production",10,"Monthly","112014","1151991" ,"Release...

103

Bonneville Power Administration, Oregon Energy Northwest, Washington...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bonneville Power Administration, Oregon Energy Northwest, Washington; Wholesale Electric Primary Credit Analyst: David N Bodek, New York (1) 212-438-7969; david.bodek@standardandpo...

104

Oregon: a guide to geothermal energy development  

SciTech Connect (OSTI)

Oregon's geothermal potential, exploration, drilling, utilization, legal and institutional setting are covered. Economic factors of direct use projects are discussed. (MHR)

Justus, D.; Basescu, N.; Bloomquist, R.G.; Higbee, C.; Simpson, S.

1980-06-01T23:59:59.000Z

105

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

106

GEOTHERMAL EXPLORATION ASSESSMENT AND INTERPRETATION, KLAMATH BASIN, OREGON-SWAN LAKE AND KLAMATH HILLS AREA  

E-Print Network [OSTI]

survey of the Swan Lake Valley area, Oregon: Geonornicssurvey of the Swan Lake Valley Area, Oregon: GeonomicsKLAMATH BASIN, OREGON SWAN LAKE AND KLAMATH HILLS AREA M.

Stark, M.

2011-01-01T23:59:59.000Z

107

GEOTHERMAL EXPLORATION ASSESSMENT AND INTERPRETATION, KLAMATH BASIN, OREGON-SWAN LAKE AND KLAMATH HILLS AREA  

E-Print Network [OSTI]

KLAMATH BASIN, OREGON SWAN LAKE AND KLAMATH HILLS AREA M.survey of the Swan Lake Valley area, Oregon: Geonornicssurvey of the Swan Lake Valley Area, Oregon: Geonomics

Stark, M.

2011-01-01T23:59:59.000Z

108

MICHAEL G. RAYMER Curriculum Vitae (07/2010) Department of Physics and Oregon Center for Optics, University of Oregon, Eugene, OR 97403  

E-Print Network [OSTI]

for Optics, University of Oregon, Eugene, OR 97403 (503) 346-4785 PROFESSIONAL EXPERIENCE Knight Professor, 1998 - 1999. Director, Oregon Center for Optics, University of Oregon, Eugene, Oregon; 1997 ­ 1998 of Physics, University of Oregon, Eugene, Oregon; 1988 - 1990. Associate Professor of Optics, The Institute

Richmond, Geraldine L.

109

Summer Program for Undergraduate Research Alaska Oregon Research Training Alliance  

E-Print Network [OSTI]

in SPUR Oregon-Chile International REU Program University of Oregon, Eugene OR 97403-1254 phone (541 Undergraduate Researchers in SPUR (OURS) spur.uoregon.edu Oregon-Chile International REU Program (OC-iREU) spurSummer Program for Undergraduate Research Alaska Oregon Research Training Alliance NSF REU Site

Oregon, University of

110

Report on the Oregon Ballast Water Management Program in 2004  

E-Print Network [OSTI]

Report on the Oregon Ballast Water Management Program in 2004 #12;Acknowledgements We would like Ballast Water Management Program in 2004 Produced for the Oregon State Legislature By The Oregon Ballast State University September 2004 #12;Report on Oregon Ballast Water Management Program 2004 Executive

111

Report on the Oregon Ballast Water Management Program  

E-Print Network [OSTI]

Report on the Oregon Ballast Water Management Program in 2002 #12;Report on the Oregon Ballast Water Management Program in 2002 Produced for the Oregon State Legislature by Jordan Vinograd and Mark Water Task Force December 2002 #12;Report on Oregon Ballast Water Management Program in 2002 i Executive

112

Recovery Act State Memos Oregon  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L dDepartment ofList?Department09Jersey For questionsOregon For

113

Oregon Trust Agreement Planning Project : Potential Mitigations to the Impacts on Oregon Wildlife Resources Associated with Relevant Mainstem Columbia River and Willamette River Hydroelectric Projects.  

SciTech Connect (OSTI)

A coalition of the Oregon wildlife agencies and tribes (the Oregon Wildlife Mitigation Coalition) have forged a cooperative effort to promote wildlife mitigation from losses to Oregon wildlife resources associated with the four mainstream Columbia River and the eight Willamette River Basin hydroelectric projects. This coalition formed a Joint Advisory Committee, made up of technical representatives from all of the tribes and agencies, to develop this report. The goal was to create a list of potential mitigation opportunities by priority, and to attempt to determine the costs of mitigating the wildlife losses. The information and analysis was completed for all projects in Oregon, but was gathered separately for the Lower Columbia and Willamette Basin projects. The coalition developed a procedure to gather information on potential mitigation projects and opportunities. All tribes, agencies and interested parties were contacted in an attempt to evaluate all proposed or potential mitigation. A database was developed and minimum criteria were established for opportunities to be considered. These criteria included the location of the mitigation site within a defined area, as well as other criteria established by the Northwest Power Planning Council. Costs were established for general habitats within the mitigation area, based on estimates from certified appraisers. An analysis of the cost effectiveness of various types of mitigation projects was completed. Estimates of operation and maintenance costs were also developed. The report outlines strategies for gathering mitigation potentials, evaluating them, determining their costs, and attempting to move towards their implementation.

United States. Bonneville Power Administration.

1993-10-01T23:59:59.000Z

114

Biomass Producer or Collector Tax Credit (Oregon)  

Broader source: Energy.gov [DOE]

 The Oregon Department of Energy provides a tax credit for agricultural producers or collectors of biomass.  The credit can be used for eligible biomass used to produce biofuel; biomass used in...

115

Oregon State University Hatfield Marine Science Center  

E-Print Network [OSTI]

....................................................... 4 Northwest National Marine Renewable Energy Center..........5 Oregon Sea Grant.....................................................................18 College of Veterinary Medicine............................................19 B. Federal and State Agencies Environmental Protection Agency...................................... 20 Pacific Coastal Ecology

116

Oregon State University Hatfield Marine Science Center  

E-Print Network [OSTI]

....................................................... 4 Northwest National Marine Renewable Energy Center..........5 Oregon Sea Grant of Biomedical Sciences.....................................22 B. Federal and State Agencies Environmental Protection Agency...................................23 PacificCoastalEcologyBranch, Western Ecology Division

117

University of Oregon Department of Architecture  

E-Print Network [OSTI]

thinking, and expresses an understanding of environmental awareness." #12;Summer Architecture AcademyUniversity of Oregon Department of Architecture Architecture & Interior Architecture " #12;Historically Innovative "" The School of Architecture and Allied Arts, founded in 1914, is one of the first

118

EIS-0296: South Oregon Coast Reinforcement Project, Coos Bay/North Bend, Oregon  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's proposed action to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area.

119

EIS-0296: South Oregon Coast Reinforcement Project, Coos Bay/North Bend, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration proposes to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area.

120

UNIVERSITY OF OREGON SOLAR MONITORING LABORATORY The University of Oregon (UO) Solar Moni-  

E-Print Network [OSTI]

i UNIVERSITY OF OREGON SOLAR MONITORING LABORATORY The University of Oregon (UO) Solar Moni- toring Laboratory has been measuring incident solar radiation since 1975. Current support for this work comes from the Regional Solar Radiation Monitoring Project (RSRMP), a utility consortium project including the Bon

Oregon, University of

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

CX-008533: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

45-Mile Hydroelectric Power Project Demonstration of New Methodologies to Reduce the LCOE for Small Hydropower Development (Formerly 51 Mile Project) CX(s) Applied: B5.15 Date: 05/22/2012 Location(s): Oregon Offices(s): Golden Field Office

122

CX-011541: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Organic Speciation and Interactions in Actinide-Lanthanide Separation (ALSEP) – One Step Partitioning Process of Minor Actinides, Lanthanides, and Fission Products CX(s) Applied: B3.6 Date: 12/11/2013 Location(s): Oregon Offices(s): Idaho Operations Office

123

CX-010576: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Pacific Northwest National Laboratory- Genset Heat Recovery Adsorption Chiller for Navy Forward Operations Bases CX(s) Applied: B3.6 Date: 04/11/2013 Location(s): Washington, Oregon, Georgia Offices(s): Advanced Research Projects Agency-Energy

124

CX-011393: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Build and Test of a Novel, Commercial-Scale Wave Energy Direct0Drive Rotary Power Take-Off Under Realistic Open-Ocean Conditions CX(s) Applied: A9, B5.15 Date: 12/16/2013 Location(s): Oregon, Virginia, Colorado Offices(s): Golden Field Office

125

CX-012197: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Celilo Converter Station Upgrades (update to previous CX issued on 7/25/13 and 3/11/14) CX(s) Applied: B4.11 Date: 04/30/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

126

New Biorefinery Will Bring Jobs to Northeastern Oregon | Department...  

Broader source: Energy.gov (indexed) [DOE]

New Biorefinery Will Bring Jobs to Northeastern Oregon New Biorefinery Will Bring Jobs to Northeastern Oregon August 9, 2010 - 10:00am Addthis A computer-generate image shows the...

127

CARBON SEQUESTRATION THROUGH CHANGES IN LAND USE IN OREGON  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION CARBON SEQUESTRATION THROUGH CHANGES IN LAND USE IN OREGON: COSTS, and J. Kadyszewski (Winrock International). 2007. Carbon Sequestration Through Changes in Land Use Curves, and Pilot Actions for Terrestrial Carbon Sequestration in Oregon. Report to Winrock

128

Wave Power Demonstration Project at Reedsport, Oregon  

SciTech Connect (OSTI)

Ocean wave power can be a significant source of large?scale, renewable energy for the US electrical grid. The Electrical Power Research Institute (EPRI) conservatively estimated that 20% of all US electricity could be generated by wave energy. Ocean Power Technologies, Inc. (OPT), with funding from private sources and the US Navy, developed the PowerBuoy? to generate renewable energy from the readily available power in ocean waves. OPT's PowerBuoy converts the energy in ocean waves to electricity using the rise and fall of waves to move the buoy up and down (mechanical stroking) which drives an electric generator. This electricity is then conditioned and transmitted ashore as high?voltage power via underwater cable. OPT's wave power generation system includes sophisticated techniques to automatically tune the system for efficient conversion of random wave energy into low cost green electricity, for disconnecting the system in large waves for hardware safety and protection, and for automatically restoring operation when wave conditions normalize. As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport, OR, will consist of 10 PowerBuoys located 2.5 miles off the coast. This U.S. Department of Energy Grant funding along with funding from PNGC Power, an Oregon?based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. At this time, the design and fabrication of this first PowerBuoy and factory testing of the power take?off subsystem are complete; additionally the power take?off subsystem has been successfully integrated into the spar.

Mekhiche, Mike [Principal Investigator] [Principal Investigator; Downie, Bruce [Project Manager] [Project Manager

2013-10-21T23:59:59.000Z

129

Oregon State University Sun Grant Western Regional Center  

E-Print Network [OSTI]

for Use in Pacific Ethanol's Boardman, Oregon Cellulosic Ethanol Plant Russ Karow, Oregon State University OVERVIEW Pacific Ethanol, in Boardman, Oregon, is the recipient of a federal grant to establish a 1/10 th scale cellulosic ethanol pilot plant adjacent to their existing corn-based ethanol facility. This new

Tullos, Desiree

130

OREGON SEA GRANT | SUMMER 2014 | VOLUME 3 NO. 1 ChangeHow Oregon Sea Grant  

E-Print Network [OSTI]

9 Adapting to Climate Change: Some Continuing Challenges Communicating about Climate Change: Reflections Bottom line: effective communication is critical 13 Climate Change in the Northwest Confluence's homes and business? In "Communicating about Climate Change: Reflections," Oregon Sea Grant

131

Ambulatory Research and Education Center Oregon Health Science University. Environmental Assesment  

SciTech Connect (OSTI)

DOE has prepared an Environmental Assessment (EA) (DOE/EA-0921) evaluating the proposed construction and operation of the Ambulatory Research and Education Center (AREC), which would be located on the top seven floors of the existing NeuroSensory Research Center (NRC) on the campus of the Oregon Health Sciences University (OHSU) at Portland, Oregon. The proposed action would combine activities scattered across the campus into a central facility. Based on the analysis in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC 4321 et seq. Therefore, an environmental impact statement (EIS) is not required and the Department is issuing this Finding of No Significant Impact (FONSI).

Not Available

1994-03-21T23:59:59.000Z

132

EA-1925: Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon  

Broader source: Energy.gov [DOE]

This EA evaluates Ormat Nevada, Inc.’s (Ormat’s) proposed geothermal project consists of drilling up to 16 wells for geothermal exploration approximately 70 miles southeast of Bend, Oregon and 50 miles northwest of Burns, Oregon just south of U.S. Highway 20. The proposed project includes three distinct drilling areas. Up to three wells would be drilled on lands managed by the Bureau of Land Management (BLM) Prineville District (Mahogany), up to ten wells would be drilled on lands managed by the BLM Burns District (Midnight Point), and up to three wells would be drilled on private land located adjacent to the federal geothermal leases west of Glass Butte (Private Lands). DOE funding would be associated with three of the sixteen proposed wells. BLM is the lead agency and DOE is participating as a cooperating agency.

133

Continued on back UNIVERSITY OF OREGON  

E-Print Network [OSTI]

Continued on back UNIVERSITY OF OREGON MOBILE TECHNOLOGY ACCESS AND PAYMENT OPTION REQUEST Please complete this form to apply for access to mobile technology (e.g., cell phones, smart phones, etc device use. Information on the UO policies regarding access to mobile technology and payment options can

Oregon, University of

134

Oregon State University Student Health Services  

E-Print Network [OSTI]

and exceptional clinical care. Our commitment to meeting the health needs of our students and the larger Oregon different models of health care delivery. We have focused on using a public health approach to understanding was completed this year as a first step toward that goal. The passage of health reform legislation will impact

Tullos, Desiree

135

Oregon Business Council Presented By: Elizabeth Redman  

E-Print Network [OSTI]

to markets Energy Maintain Oregon's competitive advantage in energy costs while creating energy jobs-ready industrial land in every part of the state Forest Health and Biomass Improve forest health, rural economies Resources · High Tech #12;Wave Energy Forestry Food Processing Defense Energy Efficiency Tourism Creative

Levinson, David M.

136

EIS-0204: Hermiston Generating Project, Hermiston, Oregon  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Bonneville Power Administration prepared this statement to analyze the alternatives and environmental and socioeconomic impacts thereof of transferring electrical power from a proposed privately-owned, combined cycle combustion turbine cogeneration plant in Oregon.

137

Oregon Wine Research Institute Operating Guidelines  

E-Print Network [OSTI]

for industry partnering, technology transfer, and collaboration; · Serve as an outreach pathway for transfer including wine sales and tourism. Oregon wine has become a signature state product, earning international, national, and international entities such as other wine centers and institutes; · Facilitate opportunities

Tullos, Desiree

138

Demand Response Programs Oregon Public Utility Commission  

E-Print Network [OSTI]

, Demand Side Management #12;Current Programs/Tariffs ­ Load Control Programs Cool Keeper, Utah (currentlyDemand Response Programs Oregon Public Utility Commission January 6, 2005 Mike Koszalka Director 33 MW, building to 90 MW) Irrigation load control, Idaho (35 MW summer, 2004) Lighting load control

139

GEOTHERMAL EXPLORATION ASSESSMENT AND INTERPRETATION, KLAMATH BASIN, OREGON-SWAN LAKE AND KLAMATH HILLS AREA  

E-Print Network [OSTI]

KLAMATH BASIN, OREGON SWAN LAKE AND KLAMATH HILLS AREA M.of the Swan Lake-Yonna Valley area, Klamath County, Oregon:

Stark, M.

2011-01-01T23:59:59.000Z

140

Commercial Energy Code Enforcement in Oregon and Washington  

E-Print Network [OSTI]

COMUERCIAL ENERGY CODE ENFORCEMENT IN OREGON AND WASHINGTON WILL MILLER )(AURA O'NEILL UARK JOHNSON TECHNICAL DIRECTOR PRESIDENT PUBLIC UTILITIES SPECIALIST PORTLAND ENERGY CONSERVATION, IWC . , O'NEILL 6 CO., INC., BONNEVILLE POWER... ADHINISTBATION PORTLAND, OREGON SEATTLE, WASHINGTON PORTLAND. OREGON In recent years. many states and local jurisdictions have passed mandatory building codes to achieve energy efficiency in new construction. All too often the political bodies that pass...

Johnson, M.; Miller, W.; O'Neill, M.

1988-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

A Strontium Isotopic Study Of Newberry Volcano, Central Oregon...  

Open Energy Info (EERE)

Strontium Isotopic Study Of Newberry Volcano, Central Oregon- Structural And Thermal Implications Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal...

142

Central Electric Coop. Oregon Trail Electric Coop. Douglas Electric  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Central Electric Coop. Oregon Trail Electric Coop. Douglas Electric Coop. Blachly- Lane Co. Coop Umatilla Electric Coop. Hermiston Milton- Freewater Idaho Co Light & Power Coop....

143

Oregon: DOE Advances Game-Changing EGS Geothermal Technology...  

Office of Environmental Management (EM)

demonstration project, at Newberry Volcano near Bend, Oregon, represents a key step in geothermal energy development, demonstrating that an engineered geothermal reservoir can...

144

EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho...  

Office of Environmental Management (EM)

Transmission Line, Oregon and Idaho SUMMARY The Bureau of Land Management and the U.S. Forest Service are preparing, with DOE's Bonneville Power Administration (BPA) as a...

145

airport portland oregon: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Oregon February 25, 2009 MEMORANDUM TO: Power Committee FROM: Maury Galbraith wholesale power market prices. Under "medium" fuel price and carbon dioxide (CO2) emission price...

146

Oregon Institute of Technology Recognized for Increasing its...  

Energy Savers [EERE]

America's First Geothermally Heated University Campus Adds 3.5 Megawatts of Clean Electricity Generation WASHINGTON-Today, the Department of Energy recognized the Oregon...

147

Oregon: a guide to geothermal energy development. [Includes glossary  

SciTech Connect (OSTI)

The following subjects are covered: Oregons' geothermal potential, exploration methods and costs, drilling, utilization methods, economic factors of direct use projects, and legal and institutional setting. (MHR)

Justus, D.; Basescu, N.; Bloomquist, R.G.; Higbee, C.; Simpson, S.

1980-06-01T23:59:59.000Z

148

Southern Oregon University Highlighted by U.S. Energy Department...  

Office of Environmental Management (EM)

by Southern Oregon University (SOU). The school's investments in renewable energy, sustainability, and purchasing Renewable Energy Certificates (RECs) are benefiting residents and...

149

Oregon Institute of Technology District Heating Low Temperature...  

Open Energy Info (EERE)

District Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Oregon Institute of Technology District Heating Low Temperature Geothermal Facility Facility...

150

MHK Technologies/Oregon State University Columbia Power Technologies...  

Open Energy Info (EERE)

Jump to: navigation, search << Return to the MHK database homepage Oregon State University Columbia Power Technologies Direct Drive Point Absorber.jpg Technology Profile...

151

The Geothermal System Near Paisley Oregon: A Tectonomagmatic Framework for Understanding the Geothermal Resource Potential of Southeastern Oregon.  

E-Print Network [OSTI]

??The tectonic and magmatic framework of southeast Oregon provides the conditions necessary for the existence of geothermal energy resources. However, few detailed studies of geothermal… (more)

Makovsky, Kyle Aaron

2013-01-01T23:59:59.000Z

152

NE Oregon Wildlife Project "Precious Lands"  

E-Print Network [OSTI]

NE Oregon Wildlife Project "Precious Lands" Managed by The Nez Perce Tribe Angela C. Sondenaa, Ph Oct 1996 Helm 10,306 $2,660,674.00 Sept 1998 Graham Tree farm 158 $402,453.00 Aug 1999 Beach Ranch 1 of shrub sub-canopy Project Goals: 40-70% tree canopy cover 35-65% shrub canopy cover > 3.5 snags 6-10" dbh

153

Oatfield, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(Utility Company)ReferencesNuiqsut,Place,Oakmont, Pennsylvania:Oatfield, Oregon:

154

Oregon Environmental Quality Commission | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(UtilityCounty, Michigan: EnergyOpenBarterVirginia.Land or Waterbody |Oregon

155

Oregon/Transmission | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(UtilityCounty, Michigan:OregonTransmissionHeader.png Roadmap Agency Links Local

156

Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(UtilityCounty, Michigan:OregonTransmissionHeader.png Roadmap Agency Links

157

Medford, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Powerstories on climateJunoMedanosElectric Co LtdJackson County, Oregon. It

158

Milwaukie, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte GmbHMilo, Maine: Energy Resources JumpMilwaukie, Oregon: Energy

159

Moro, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3 Climate ZoneMontrose,Stanley Capital Grp IncMoro, Oregon: Energy

160

Scio, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, searchVirginiaRooseveltVISantonOpen EnergyScio, Oregon: Energy Resources Jump

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Metzger, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte GmbH Jump to: navigation,Metalysis JumpMetzger, Oregon: Energy

162

Reedsport, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColoradosourceRausWyoming: EnergyElecRedwoodReedsport, Oregon:

163

Idanha, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:GreerHiCalifornia:ISI SolarIdanha, Oregon: Energy Resources Jump to:

164

Tri-Met's Experience With Automatic Passenger Counter and Automatic Vehicle Location Systems  

E-Print Network [OSTI]

on an earlier draft. #12;Introduction The Tri-County Metropolitan Transportation District of Oregon (TriTri-Met's Experience With Automatic Passenger Counter and Automatic Vehicle Location Systems James State University Portland, OR 97207 This report is benefited from interviews of Tri-Met staff involved

Bertini, Robert L.

165

Dear Future FIG Student, Welcome to the University of Oregon!  

E-Print Network [OSTI]

of the year is an overnight trip to Ashland, Oregon and the Oregon Shakespeare Festival. As a class, we'll get a chance to enjoy Ashland, which is a great town. We will stay in a hostel, share a few meals

Oregon, University of

166

Oregon State University OSU | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(UtilityCounty, Michigan: EnergyOpenBarterVirginia.Land orFacilitiesOregonOSU Jump

167

Categorical Exclusion Determinations: Oregon | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd:JuneNovember 26,EnergyOregon Categorical Exclusion

168

Corvallis, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:EnergyWisconsin:2003) |Cordova Electric Coop, IncKilaueaCorvallis, Oregon:

169

Albany, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORTOpenWende NewSowitecAWSAgri-Energy LLCAir(EC-LEDS) | OpenOregon:

170

Earth Share Oregon | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It is classified asThis article is a stub. You canAdvantageOregon Jump to:

171

Wasco, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformationSEDS dataIndiana: EnergyWasco County, Oregon: EnergyWasco,

172

Oregon Public Utility Commission | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment ofOil's Impact on Our National-Projects inDepartment ofOregon

173

Energy Incentive Programs, Oregon | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQBusinessin Jamaica,Idaho EnergyMontanaOregon Energy Incentive

174

Salem, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant ofRichardton Abbey Wind Farm(CTIhinder forLucia:Sakti3Oregon:

175

Sherwood, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd Jump to: navigation,Pvt Ltd Jump to:Shenzhen79. It. ItSherry,Park,Oregon:

176

Oregon Trail Wind Park | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrange County is a county inPublic HealthOregon Trail Wind

177

Oregon Water Resources Department | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrange County is a county inPublic HealthOregon Trail

178

Oregon/Incentives | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrange County is a countyIncentives < Oregon Jump to:

179

Oregon/Wind Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrange County is a countyIncentives < Oregon Jump to:Wind

180

Yamhill, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative JumpWilliamsonWoodsonCounty is a county inXiningYamagawaYamhill, Oregon:

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Rockcreek, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, searchVirginia BlueRiverwoods,Rock Sampling DetailsRockPortRockcreek, Oregon:

182

Rufus, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, searchVirginiaRoosevelt Gardens is°andRubidoux, California:Rufus, Oregon:

183

EnergyConnect (Oregon) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6 NoSan Leandro, California Zip: Energy UnlimitedOregon) Jump

184

Amity, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300Algoil JumpAltergy SystemsAmerican EnergyAmericus,AmeyaAmity, Oregon: Energy

185

Canby, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: EnergyBostonFacility | Open EnergySolar Inc CSI Jump to:CanalCanby, Oregon:

186

Central Oregon Irrigation District | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:Energy Information on PV2009 | Open Energy InformationOregon Irrigation

187

Nicholas B. Tufillaro PO Box 1028, Corvallis, Oregon 97339  

E-Print Network [OSTI]

, Oregon State University, 2005-2008. Member of Technical Staff, Agilent/Hewlett-Packard Labs, Palo Alto. Funded: NASA 2014-16, Impacts of Population Growth on the San Francisco Bay and Delta Ecosystem, $1

188

The Holy Dose: Spiritual adventures with Southern Oregon's psychedelic crusaders  

E-Print Network [OSTI]

crusaders By Alex L. Weber Ashland, Oregon is a smart littleyearly Shakespeare Festival, Ashland is one of those placeswell-known is the fact that Ashland is home to the Church of

Weber, Alex L

2011-01-01T23:59:59.000Z

189

The Oregon Health Insurance Experiment: Evidence from the First Year  

E-Print Network [OSTI]

In 2008, a group of uninsured low-income adults in Oregon was selected by lottery to be given the chance to apply for Medicaid. This lottery provides an opportunity to gauge the effects of expanding access to public health ...

Taubman, Sarah

190

Oregon Department of Transportation’s OTIA III State Bridge Delivery Program : 400 bridges one biological opinion  

E-Print Network [OSTI]

the Oregon ESA, Migratory Bird Treaty Act (MBTA), Marinethe Oregon ESA, Migratory Bird Treaty Act (MBTA), MarineRemoval-Fill Law, Migratory Bird Treaty Act, Marine Mammal

Bonoff, Michael B.; Toledo, Zachary O.; Ryan, William A.; Carson, Robert G.

2005-01-01T23:59:59.000Z

191

Geothermal assessment activities in Oregon, 1979-1980, and a case study example at Powell Buttes, Oregon  

SciTech Connect (OSTI)

Geothermal assessment activities in Oregon are reviewed briefly. An isogradient map, a lithologic and temperature log, and a finite difference thermal conductivity model of Powell Buttes area are presented. (MHR)

Priest, G.R.; Black, G.L.; Blackwell, D.D.; Brown, D.E.; Ruscetta, C.A.; Foley, D. (eds.)

1981-05-01T23:59:59.000Z

192

Clean Energy Works Oregon Final Technical Report  

SciTech Connect (OSTI)

In April 2010, the City of Portland received a $20 million award from the U.S. Department of Energy, as part of the Energy Efficiency and Conservation Block Grant program. This award was appropriated under the American Recovery and Reinvestment Act (ARRA), passed by President Obama in 2009. DOE’s program became known as the Better Buildings Neighborhood Program (BBNP). The BBNP grant objectives directed the City of Portland Bureau of Planning and Sustainability (BPS) as the primary grantee to expand the BPS-led pilot program, Clean Energy Works Portland, into Clean Energy Works Oregon (CEWO), with the mission to deliver thousands of home energy retrofits, create jobs, save energy and reduce carbon dioxide emissions.The Final Technical Report explores the successes and lessons learned from the first 3 years of program implementation.

Jacob, Andria [City of Portland] [City of Portland; Cyr, Shirley [Clean Energy Works] [Clean Energy Works

2013-12-31T23:59:59.000Z

193

GEOTHERMAL EXPLORATION ASSESSMENT AND INTERPRETATION, KLAMATH BASIN, OREGON-SWAN LAKE AND KLAMATH HILLS AREA  

E-Print Network [OSTI]

s r e l a t e d t o geothermal power generation i n Oregon:G. , 1966, Energy and power of geothermal resources: Dept. ogeothermal rpospect, Klamath County, Oregon: Thermal Power

Stark, M.

2011-01-01T23:59:59.000Z

194

SEMI-ANNUAL REPORTS FOR LNG DEVELOPMENT COMPANY, LLC (D/B/A Oregon...  

Broader source: Energy.gov (indexed) [DOE]

LNG DEVELOPMENT COMPANY, LLC (DBA Oregon LNG) - FE DKT. NO. 12-48-LNG - ORDER 3100 SEMI-ANNUAL REPORTS FOR LNG DEVELOPMENT COMPANY, LLC (DBA Oregon LNG) - FE DKT. NO. 12-48-LNG...

195

Upriver and Downriver: A Gradient of Tobacco Intensification Along the Klamath River, California and Oregon  

E-Print Network [OSTI]

and Oregon DONNL.TODT Ashland Parks Department, 340 S.Pioneer, Ashland, OR 97520 This paper identifies the types

Todt, Donn L

2007-01-01T23:59:59.000Z

196

E-Print Network 3.0 - activity hermiston oregon Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Oregon State University Collection: Environmental Sciences and Ecology 45 The Price of Electricity from Private Power Producers Summary: ) . . . . . . . . . . . . . . . . . . ....

197

4-H 331 REPRINTED JULY 2005 $8.00 Oregon 4-H Forestry  

E-Print Network [OSTI]

4-H 331 REPRINTED JULY 2005 $8.00 #12;Oregon 4-H Forestry Member Manual Contents Lesson 1: Welcome to Oregon 4-H Forestry 1 Lesson 2: Forests in Oregon 4 Lesson 3 Looking Closer 7 Lesson 4 Succession 9 Appendices Appendix A Answers to forestry puzzles 46 Appendix B Extension pubhcations The Wildlife Garden 48

Tullos, Desiree

198

Validating Predicted Rural Corridor Travel Times from an Automated License Plate Recognition System: Oregon's Frontier Project  

E-Print Network [OSTI]

: Oregon's Frontier Project Robert L. Bertini Department of Civil & Environmental Engineering Portland recognition­the Frontier Travel Time project. As part of the Frontier project, the Oregon Department, Utah, and Oregon) have formed the Frontier pooled-fund study which has implemented and tested ITS

Bertini, Robert L.

199

Library Locations Locations other than Main Library  

E-Print Network [OSTI]

Library Locations Locations other than Main Library Example: Feminist Studies HQ1410 .U54 2009 University of California, Santa Barbara Library www.library.ucsb.edu Updated 3-2014 A - B.......................................6 Central M - N..................................................Arts Library (Music Building) P

200

STANDARD OPERATING PROCEDURE Location(s): ___________________________________________________  

E-Print Network [OSTI]

of as hazardous waste. 8. Decontamination: Specific instructions: For light contamination of small areas or items12.1 STANDARD OPERATING PROCEDURE for PHENOL Location(s): ___________________________________________________ Chemical(s): Phenol Specific Hazards: May be fatal if inhaled. Harmful if absorbed through skin. Harmful

Pawlowski, Wojtek

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

CX-008328: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Oregon Offices(s): National Energy Technology Laboratory Application of electronic optical measurement tools for characterization of oxycombustion flames at cooperating test...

202

Oregon - Rankings - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 10 MECS Survey Data 2010 | 2006 | 20024.9513BOEOperableOregon Oregon

203

Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

United States. Bonneville Power Administration.

1995-09-01T23:59:59.000Z

204

The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office: FY 1999 Watershed Restoration Projects : Annual Report 1999.  

SciTech Connect (OSTI)

The John Day River is the second longest free-flowing river in the contiguous United States and one of the few major subbasins in the Columbia River basin containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, the fourth largest drainage area in Oregon. With its beginning in the Strawberry Mountains near the town of Prairie City, the John Day flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring chinook salmon and summer steelhead, red band, westslope cutthroat, and redband trout, the John Day system is truly one of national significance. The entire John Day basin was granted to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) initiated contracting the majority of its construction implementation actions with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of the projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 1999, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional eleven (11) watershed conservation projects. The types of projects implemented included installation of infiltration galleries, permanent diversions, pumping stations, and irrigation efficiency upgrades. Project costs in 1999 totaled $284,514.00 with a total amount of $141,628.00 (50%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Confederated Tribes of Warm Springs, Oregon Watershed Enhancement Board, and individual landowners.

Robertson, Shawn W.

2001-03-01T23:59:59.000Z

205

The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : Annual Report, 2001.  

SciTech Connect (OSTI)

The John Day River is the nation's second longest free-flowing river in the contiguous United States, which is entirely unsupplemented for it's runs of anadromous fish. Located in eastern Oregon, the John Day Basin drains over 8,000 square miles, is Oregon's fourth largest drainage basin, and the basin incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the mainstem John Day River flows 284 miles in a northwesterly direction entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon, summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance. The Majority of the John Day Basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in John Day to coordinate basin restoration projects, monitoring, planning, and other watershed restoration activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in John Day, who subcontracts the majority of the construction implementation activities for these restoration projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2001, the JDBO and GSWCD continued their successful partnership between the two agencies and basin landowners to implement an additional ten (10) watershed conservation projects. The project types include permanent lay flat diversions, pump stations, and return-flow cooling systems. Project costs in 2001 totaled $572,766.00 with $361,966.00 (67%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources, such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board (OWEB), and individual landowners.

Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

2002-12-01T23:59:59.000Z

206

The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : Annual Report, 2000.  

SciTech Connect (OSTI)

The John Day is the second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles--Oregon's third largest drainage basin--and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, red band, westslope cutthroat, and redband trout, the John Day system is truly a basin with national significance. Most all of the entire John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the Basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Using funding from the Bonneville Power Administration, Bureau of Reclamation, and others, the John Day Basin Office (JDBO) subcontracts the majority of its construction implementation activities with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/review, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2000, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional six watershed conservation projects funded by the BPA. The types of projects include permanent diversions, pump stations, and return-flow cooling systems. Project costs in 2000 totaled $533,196.00 with a total amount of $354,932.00 (67%) provided by the Bonneville Power Administration and the remainder coming from other sources such as the BOR, Oregon Watershed Enhancement Board, and individual landowners.

Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

2001-03-01T23:59:59.000Z

207

CRUISE PLAN R/V OCEANUS Oregon State University  

E-Print Network [OSTI]

APPENDIX 2 CRUISE PLAN R/V OCEANUS Oregon State University College of Earth, Ocean & Atmospheric positions and route waypoints.) WILL RADIOACTIVE METHODS BE USED? YES NO If so, list OSU radiation use/Charting Ocean Engineering Training Transit/Non-science Pollution Assessment Other Additional Cruise Info

Kurapov, Alexander

208

Modeling upwelling circulation off the Oregon coast Jianping Gan  

E-Print Network [OSTI]

-resolution curvilinear grid is utilized. The response of the coastal ocean to forcing by observed wind stress and heat fields. Over the bank the alongshore coastal jet is displaced offshore, and colder upwelled water extends-rich surface waters near the coast. Along the north central part of the Oregon coast between 45°N and 45.5°N

Gan, Jian-Ping

209

II. HISTORICAL BACKGROUND Since 1977 the University of Oregon Solar  

E-Print Network [OSTI]

2 II. HISTORICAL BACKGROUND Since 1977 the University of Oregon Solar Monitoring Laboratory has operated a solar radiation monitoring network in the Pacific Northwest. The number of stations participat of utilities headed by the Eugene Water and Electric Board initiated the Re- gional Solar Radiation Monitoring

Oregon, University of

210

Oregon State University Sun Grant Western Regional Center  

E-Print Network [OSTI]

-term goal of this research project is to optimize the use of halophytic microalgae as a biofuels cropOregon State University Sun Grant Western Regional Center Biofuels from Salt Basin Algae and insoluble starch content has been completed for nineteen (19) strains of halophytic microalgae. Data were

Tullos, Desiree

211

Oregon State University Sun Grant Western Regional Center  

E-Print Network [OSTI]

and Economic Analysis of Cellulosic Ethanol from Grass Straw in the Pacific Northwest Ganti Murthy, Oregon to cellulosic ethanol. This study will provide information on using Pacific Northwest biomass in a sustainable and pretreatment processes on ethanol yields in Pacific Northwest U.S.). Contact: Ganti Murthy, Biological

Tullos, Desiree

212

Oregon State University Sun Grant Western Regional Center  

E-Print Network [OSTI]

Oregon State University Sun Grant Western Regional Center Hybrid Poplar as a Regional Ethanol is to couple hybrid poplar production with end-use ethanol production. Dr. Swanson, working in collaboration with industrial partners, will analyze feedstock taken from selected hybrid poplar clones to develop ethanol yield

Tullos, Desiree

213

Oregon State University Sun Grant Western Regional Center  

E-Print Network [OSTI]

and Cellulases in the Bioconversion of Lignocellulosic Feedstocks to Ethanol Christine Kelly, Oregon State to ethanol. The team will examine fungal heme peroxidases to discover new "accessory" enzymes that function of conversion of softwoods to ethanol. Progress to Date · Bioreactor runs and analyses: Dr. Kelly and her

Tullos, Desiree

214

Oregon Health & Science University Technology Transfer and Business Development  

E-Print Network [OSTI]

Oregon Health & Science University Technology Transfer and Business Development Annual Report 2011 Business Development 6 Impacting Global Health - Drs. David and Deborah Lewinsohn Technology Transfer 7 System OHSU is reinventing technology transfer. Over the years the office has evolved from "Tech Transfer

Chapman, Michael S.

215

January 21, 2014 Issue No. 56 OREGON STATE UNIVERSITY  

E-Print Network [OSTI]

($ in millions) Government Relations Update 2 OREGON STATE UNIVERSITY #12;FY 2015 Budget It has been widely reported that release of the Administration's FY 2015 budget will be delayed by about a month. This delay it likely that the budget will be released closer to early to mid-March. The FY2015 discretionary top line

Escher, Christine

216

EIS-0201: Coyote Springs Cogeneration Project Morrow Count, Oregon  

Broader source: Energy.gov [DOE]

This environmental impact statement analyzes the protential impacts of the Coyote Springs Cogeneration Project, a proposed natural gas-fired cogeneration power plant near Boardman, Oregon. The proposed power plant would be built on a 22-acre site in the Port of Morrow Industrial Park. The plant would have two combustion turbines that would generate 440 average megawatts of energy when completed.

217

3DEP in Oregon by the Numbers Expected annual benefits  

E-Print Network [OSTI]

total cost (quality level 2) $32.41 million Payback 0.7 years Quality level 1 buy-up estimate $203DEP in Oregon by the Numbers Expected annual benefits (quality level 2) $45.73 million Estimated resource management; forest resources management; water supply and quality; infrastructure and construction

Torgersen, Christian

218

Oregon State University Sun Grant Western Regional Center  

E-Print Network [OSTI]

biomass into various products. This approach will diversify the value of forest biomass. Progress to DateOregon State University Sun Grant Western Regional Center A Forest Residue-Based Pyrolysis to produce much-needed biofuels, supply valuable bioproducts, utilize waste streams and create jobs in rural

Tullos, Desiree

219

LNG, Public Opinion and Decision-making: Conflict in Oregon  

E-Print Network [OSTI]

LNG, Public Opinion and Decision-making: Conflict in Oregon Lisa MB Harrington Kansas State University #12;2 LNG · Liquified Natural Gas · Natural gas condensed into a liquid by cooling to about -163º;· LNG is considered cleaner than coal and petroleum- based fuels, but development also poses issues

Scott, Christopher

220

2010 Mid-Year Conference Grand Ronde, Oregon  

E-Print Network [OSTI]

of American Indians/Alaska Natives in the states of Washington, Idaho, Oregon, Montana, Nevada, Northern; and WHEREAS, informed communities and improved scientific understanding of estuaries and coasts are essential access of the Tribes to specialized scientific and technical expertise, as they evaluate and/or implement

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Last Edit 2/8/2011 OREGON STATE UNIVERSITY  

E-Print Network [OSTI]

· Hazardous Materials · Public Safety/Crowd Control and Management · Rescue · Public Works · VolunteersLast Edit 2/8/2011 OREGON STATE UNIVERSITY MASTER EMERGENCY MANAGEMENT PLAN #12;Last Edit: 2/8/2011 1 OVERVIEW This document provides a management framework for responding to incidents that may

Escher, Christine

222

STUDENT PROFILES THE OREGON MBA UNIVERSITY OF OREGON MBAINFO@UOREGON.EDU MBA.UOREGON.EDU 2  

E-Print Network [OSTI]

corresponding to the college's centers of excellence: · Center for Sustainable Business Practices · Finance FOR SUSTAINABLE BUSINESS PRACTICES Renowned authorities in sustainable innovation build leaders able to balance program at the University of Oregon's Lundquist College of Business excels at delivering the next

223

THE OREGON MBA | UNIVERSITY OF OREGON | MBAINFO@UOREGON.EDU | MBA.UOREGON.EDU ii Companies hiring MBA students and  

E-Print Network [OSTI]

corresponding to the college's centers of excellence: · Center for Sustainable Business Practices · Finance in sustainable innovation build leaders able to balance social, environmental, and financial responsibilities program at the University of Oregon's Lundquist College of Business excels at delivering the next

224

The Oregon Coast Book, 201112 Edition 123 Check Web site for updates: hmsc.oregonstate.edu/visitor/oregon-coast-quests  

E-Print Network [OSTI]

. These panels demonstrate that solar energy is viable on the coast though it's not always sunny. HMSC by these solar panels? The answer is in the Quest Box at the end of your journey! Sustainability "The ability.oregonstate.edu/visitor/oregon-coast-quests In front of the Visitor Center a patio lies outside. Find panels facing skyward. kilowatts they provide

Wright, Dawn Jeannine

225

CX-009583: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Oregon Offices(s): Golden Field Office The U.S. DOE is proposing to provide federal funding to Oregon State University in partnership with the University of Washington to...

226

Reversible micromachining locator  

DOE Patents [OSTI]

This invention provides a device which includes a locator, a kinematic mount positioned on a conventional tooling machine, a part carrier disposed on the locator and a retainer ring. The locator has disposed therein a plurality of steel balls, placed in an equidistant position circumferentially around the locator. The kinematic mount includes a plurality of magnets which are in registry with the steel balls on the locator. In operation, a blank part to be machined is placed between a surface of a locator and the retainer ring (fitting within the part carrier). When the locator (with a blank part to be machined) is coupled to the kinematic mount, the part is thus exposed for the desired machining process. Because the locator is removably attachable to the kinematic mount, it can easily be removed from the mount, reversed, and reinserted onto the mount for additional machining. Further, the locator can likewise be removed from the mount and placed onto another tooling machine having a properly aligned kinematic mount. Because of the unique design and use of magnetic forces of the present invention, positioning errors of less than 0.25 micrometer for each machining process can be achieved. 7 figs.

Salzer, L.J.; Foreman, L.R.

1999-08-31T23:59:59.000Z

227

Reversible micromachining locator  

DOE Patents [OSTI]

This invention provides a device which includes a locator, a kinematic mount positioned on a conventional tooling machine, a part carrier disposed on the locator and a retainer ring. The locator has disposed therein a plurality of steel balls, placed in an equidistant position circumferentially around the locator. The kinematic mount includes a plurality of magnets which are in registry with the steel balls on the locator. In operation, a blank part to be machined is placed between a surface of a locator and the retainer ring (fitting within the part carrier). When the locator (with a blank part to be machined) is coupled to the kinematic mount, the part is thus exposed for the desired machining process. Because the locator is removably attachable to the kinematic mount, it can easily be removed from the mount, reversed, and reinserted onto the mount for additional machining. Further, the locator can likewise be removed from the mount and placed onto another tooling machine having a properly aligned kinematic mount. Because of the unique design and use of magnetic forces of the present invention, positioning errors of less than 0.25 micrometer for each machining process can be achieved.

Salzer, Leander J. (Los Alamos, NM); Foreman, Larry R. (Los Alamos, NM)

1999-01-01T23:59:59.000Z

228

Reversible micromachining locator  

DOE Patents [OSTI]

A locator with a part support is used to hold a part onto the kinematic mount of a tooling machine so that the part can be held in or replaced in exactly the same position relative to the cutting tool for machining different surfaces of the part or for performing different machining operations on the same or different surfaces of the part. The locator has disposed therein a plurality of steel balls placed at equidistant positions around the planar surface of the locator and the kinematic mount has a plurality of magnets which alternate with grooves which accommodate the portions of the steel balls projecting from the locator. The part support holds the part to be machined securely in place in the locator. The locator can be easily detached from the kinematic mount, turned over, and replaced onto the same kinematic mount or another kinematic mount on another tooling machine without removing the part to be machined from the locator so that there is no need to touch or reposition the part within the locator, thereby assuring exact replication of the position of the part in relation to the cutting tool on the tooling machine for each machining operation on the part.

Salzer, Leander J. (Los Almos, NM); Foreman, Larry R. (late of Los Alamos, NM)

2002-01-01T23:59:59.000Z

229

E-Print Network 3.0 - administration portland oregon Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 4 5 > >> 1 First Name Last Name Affiliation TitlePosition Amanda Abbott Student Sustainability Initiative Waste Reduction Coordinator Summary: Binhussin University of Oregon...

230

Avoiding Hard Choices: Oregon's Special Session to Amend the 2009-2011 Budget  

E-Print Network [OSTI]

Guide to the Oregon State Budget. ” Salem News. January 17.Every Pocket to Fill Budget. ” The Oregonian. Feb- ruary 20,Deconstructing the State Budget. ” Portland, Or- egon,

Stabrowski, Donald J.

2011-01-01T23:59:59.000Z

231

The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2003 Annual Report.  

SciTech Connect (OSTI)

The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.

Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

2004-02-27T23:59:59.000Z

232

Testing the effectiveness of an acoustic deterrent for gray whales along the Oregon coast  

SciTech Connect (OSTI)

This study was conducted to determine whether a low-powered sound source could be effective at deterring gray whales from areas that may prove harmful to them. With increased interest in the development of marine renewal energy along the Oregon coast the concern that such development may pose a collision or entanglement risk for gray whales. A successful acoustic deterrent could act as a mitigation tool to prevent harm to whales from such risks. In this study, an acoustic device was moored on the seafloor in the pathway of migrating gray whales off Yaquina Head on the central Oregon coast. Shore-based observers tracked whales with a theodolite (surveyor’s tool) to accurately locate whales as they passed the headland. Individual locations of different whales/whale groups as well as tracklines of the same whale/whale groups were obtained and compared between times with the acoustic device was transmitting and when it was off. Observations were conducted on 51 d between January 1 and April 15, 2012. A total of 143 individual whale locations were collected for a total of 243 whales, as well as 57 tracklines for a total of 142 whales. Inclement weather and equipment problems resulted in very small sample sizes, especially during experimental periods, when the device was transmitting. Because of this, the results of this study were inconclusive. We feel that another season of field testing is warranted to successfully test the effectiveness of the deterrent, but recommend increasing the zone of influence to 3 km to ensure the collection of adequate sample sizes. Steps have been taken to acquire the necessary federal research permit modification to authorize the increased zone of influence and to modify the acoustic device for the increased power. With these changes we are confident we will be able to determine whether the deterrent is effective at deflecting gray whales. A successful deterrent device may serve as a valuable mitigation tool to protect gray whales, and other baleen whales, in the event that marine energy development poses a collision or entanglement risk.

Lagerquist, Barbara [Oregon State University Marine Mammal Institute; Winsor, Martha [Oregon State University Marine Mammal Institute; Mate, Bruce [Oregon State University Marine Mammal Institute

2012-12-31T23:59:59.000Z

233

OREGON LEGISLATIVE ASSEMBLY OFFICE OF THE SENATE PRESIDENT  

E-Print Network [OSTI]

, Bend, Eugene and Ashland, as well as a hearing at the State Capitol where participants from Hood River," said Buckley (D-Ashland). "We want to hear what services are critical to folks in rural Oregon, as well public hearings from 5:30 to 8:30 p.m. in Bend on April 29 and Ashland on April 30 and a 1 to 4 p

Tullos, Desiree

234

Oregon Rules of Appellate Procedure | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(UtilityCounty, Michigan: EnergyOpenBarterVirginia.Land orFacilitiesOregon Rules

235

Oregon State Endangered Species List | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(UtilityCounty, Michigan: EnergyOpenBarterVirginia.Land orFacilitiesOregon

236

Oregon Trail Mushrooms Industrial Low Temperature Geothermal Facility |  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(UtilityCounty, Michigan: EnergyOpenBarterVirginia.Land orFacilitiesOregonOSU

237

Oregon Wave Energy Trust OWET | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(UtilityCounty, Michigan: EnergyOpenBarterVirginia.Land orFacilitiesOregonOSUWave

238

Benton County, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergyCTBarre Biomass FacilityOregon: Energy Resources Jump to:

239

Columbia Rural Elec Assn, Inc (Oregon) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhioOglesby,Sullivan,Information FeedColombia: Energy7 March,Oregon) Jump

240

City of Cascade Locks, Oregon (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhio (Utility Company) Jump to: navigation,Caliente,Locks, Oregon (Utility

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

City of Drain, Oregon (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhio (Utility Company) JumpDoerun, Georgia (Utility Company)Drain, Oregon

242

Locating Heat Recovery Opportunities  

E-Print Network [OSTI]

Basic concepts of heat recovery are defined as they apply to the industrial community. Methods for locating, ranking, and developing heat recovery opportunities are presented and explained. The needs for useful heat 'sinks' are emphasized as equal...

Waterland, A. F.

1981-01-01T23:59:59.000Z

243

International land rig locator  

SciTech Connect (OSTI)

Mechanical specifications, ratings, locations, and status are listed for each of the 5,000 contract rotary drilling rigs operated by the more than 700 independent drilling contractors throughout the Free World.

Not Available

1984-03-01T23:59:59.000Z

244

International land rig locator  

SciTech Connect (OSTI)

Mechanical specifications, ratings, locations, and status are listed for each of the 5,000 contract rotary drilling rigs operated by more than 700 independent drilling contractors throughout the Free World.

Not Available

1983-09-01T23:59:59.000Z

245

Location linked information  

E-Print Network [OSTI]

This work builds an infrastructure called Location Linked Information that offers a means to associate digital information with public, physical places. This connection creates a hybrid virtual/physical space, called glean ...

Mankins, Matthew William David, 1975-

2003-01-01T23:59:59.000Z

246

a r r i o r BUILDING# NAME LOCATION BUILDING# NAME LOCATION OTHER BUILDINGS LOCATION SORORITIES LOCATION  

E-Print Network [OSTI]

Admissions Parking Palmer Lake B l a c k W a r r i o r R i v e r BUILDING# NAME LOCATION BUILDING# NAME LOCATION OTHER BUILDINGS LOCATION SORORITIES LOCATION 7046 70127012 1155 10331033 1150 1039 1038

Carver, Jeffrey C.

249

Oregon Contractors ID: 1868664 Prepared by Brandon Adams, Program Manager| McKinstry  

E-Print Network [OSTI]

g. Renewable Electricity Production Tax Credit h. Utility Incentives i. Energy Trust of Oregon i Options b. State Incentives c. Federal Incentives d. Energy Efficient Commercial Buildings Tax Deductions Water Heating Buy Down Program j. Oregon Energy Partners Commercial Incentive Program k. Bonneville

Oregon, University of

250

Validating Predicted Rural Corridor Travel Times from an Automated License Plate Recognition System: Oregon's Frontier Project  

E-Print Network [OSTI]

: Oregon's Frontier Project Robert L. Bertini Department of Civil & Environmental Engineering Portland of a corridor travel time prediction system that uses automated license plate recognition­the Frontier Travel Time project. As part of the Frontier project, the Oregon Department of Transportation deployed a video

Bertini, Robert L.

251

Validating Predicted Rural Corridor Travel Times from an Automated License Plate Recognition System: Oregon's Frontier  

E-Print Network [OSTI]

: Oregon's Frontier Project Robert L. Bertini, Matthew Lasky, and Christopher M. Monsere Abstract automated license plate recognition­the Frontier Travel Time project. As part of the Frontier project, Montana, Wyoming, Texas, Washington, Utah, and Oregon) have formed the Frontier pooled-fund study which

Bertini, Robert L.

252

NEST OBSERVATIONS OF THE LONG-EARED OWL (Asio otus) IN BENTON COUNTY, OREGON, WITH  

E-Print Network [OSTI]

NEST OBSERVATIONS OF THE LONG-EARED OWL (Asio otus) IN BENTON COUNTY, OREGON, WITH NOTES ON THEIR FOOD HABITS RICHARD T. REYNOLDS INTRODUCTION A nesting pair of long-earedowls was found 10 miles north, when the young left the nest. This is the third record of nesting Asio otus west of the Oregon Cascades

253

Computer Lab Information Location  

E-Print Network [OSTI]

M340 Computer Lab Information · Location: The computer labs accessible to you are Weber 205 it is recommended that you save your files on a floppy when you are finished. · There is another directory, g:\\m340 to the saved files you have to add the directory to the Matlab path. To do this type addpath g:\\m340

Dangelmayr, Gerhard

254

Oregon Natural Gas Pipeline and Distribution Use (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2007 10,998 9,933 10,998 10,643 10,998through 1996)Decade Year-0 Year-1 Year-2 (Million Cubic Feet) Oregon

255

Coos County, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:EnergyWisconsin:2003) | OpenMinorCooperstown, Wisconsin: EnergyCounty, Oregon:

256

Oregon Department of Energy Webinar: Offshore Wind | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDiesel Enginesthe U.S. --NNSA)QUALITYDepartment ofOregon

257

Oregon - Search - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 10 MECS Survey Data 2010 | 2006 | 20024.9513BOEOperableOregon

258

Wasco County, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformationSEDS dataIndiana: EnergyWasco County, Oregon: Energy Resources

259

Butte Falls, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: EnergyBoston Areais aBurkittsville,Bushyhead, Oklahoma:248862°Falls, Oregon:

260

Multnomah County, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: EnergyMithun Jump to:MoeInformationMultnomah County, Oregon:

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

South Lebanon, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd JumpGTZHolland, Illinois: Energy Resources JumpOregon: Energy Resources

262

Oregon Department of Fish and Wildlife | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrange County is a county in Florida. ItsOregon Department

263

Oregon Department of Geology and Mineral Industries | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrange County is a county in Florida. ItsOregon

264

Oregon Wave Energy Partners LLC | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrange County is a county inPublic HealthOregon TrailCoos

265

Oregon's 1st congressional district: Energy Resources | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrange County is a county inPublic HealthOregon

266

Oregon's 3rd congressional district: Energy Resources | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrange County is a county inPublicInformation Oregon.

267

Oregon/Wind Resources/Full Version | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrange County is a countyIncentives < Oregon Jump

268

Washington County, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 South Place: Salt Lake City,Division ofGrove,Warsaw,Oregon: Energy Resources

269

West Linn, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative Jump to: navigation, search Name: WestDundee isHill,HurleyLinn, Oregon:

270

Wood Village, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative JumpWilliamson County,Bay,°Trap, Virginia: EnergyWest Virginia:Oregon:

271

Jennings Lodge, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429 Throttled (botOpen6 Climate Zone Subtype A.645565°,JehinJenks,Lodge, Oregon:

272

Constellation NewEnergy, Inc (Oregon) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power Basics (The following text is derivedCo JumpConstellationOregon) Jump to:

273

Cedar Mill, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:Energy Information on PV EconomicsOregon: Energy Resources Jump to:

274

Central Point, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:Energy Information on PV2009 | Open Energy InformationOregon

275

First Wind (Formerly UPC Wind) (Oregon) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6Theoretical vs Actual DataNext 25 Years | OpenFormerlyOregon)

276

City of Hermiston, Oregon (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:Energy Nebraska (Utility Company) Jump to: navigation,Hecla,Hermiston, Oregon

277

City of Springfield, Oregon (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:Energy Nebraska (UtilityGeorgiaArkansasRushford,CityInformation SiouxOregon

278

Oregon Regions | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched5 IndustrialIsadoreConnecticut RegionsScienceHampshireWallet CardsOklahomaOregon

279

OREGON STATE UNIVERSITY AND NORTHWEST NATIONAL MARINE RENEWABLE ENERGY CENTER  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLC Order No. EA-178-A1ORAU South CampusOREGON STATE

280

Jackson County, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place: EdenOverview Jump to: navigation,SercelOregon. Its FIPS

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Electric current locator  

DOE Patents [OSTI]

The disclosure herein provides an apparatus for location of a quantity of current vectors in an electrical device, where the current vector has a known direction and a known relative magnitude to an input current supplied to the electrical device. Mathematical constants used in Biot-Savart superposition equations are determined for the electrical device, the orientation of the apparatus, and relative magnitude of the current vector and the input current, and the apparatus utilizes magnetic field sensors oriented to a sensing plane to provide current vector location based on the solution of the Biot-Savart superposition equations. Description of required orientations between the apparatus and the electrical device are disclosed and various methods of determining the mathematical constants are presented.

King, Paul E. (Corvallis, OR); Woodside, Charles Rigel (Corvallis, OR)

2012-02-07T23:59:59.000Z

282

ARM - Instrument Location Table  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation InInformation InExplosionAnnouncements MediagovCampaignsListgovInstrumentsLocation Table

283

Performance Evaluation of the Engineered Cover at the Lakeview, Oregon, Uranium Mill Tailings Site  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is evaluating the performance of disposal cell covers at LM sites and exploring ways to enhance their sustainability. The cover of the Lakeview, Oregon, disposal cell relies on a compacted soil layer (CSL) to limit radon escape and water percolation into underlying tailings. The design created habitat favorable for growth of woody plants that sent roots through the CSL. The mean saturated hydraulic conductivity (K{sub sat}) of the CSL, measured at 17 locations, was 3.0 x 10{sup -5} cm s{sup -1}, 300 times greater than the design target. The highest K{sub sat} values were measured near the top of the CSL at locations both with and without roots; the lowest K{sub sat} values were measured deeper in the CSL. Water flux meters (WFMs) installed in 2005 to directly measure percolation flux show significant percolation through the cover. Three WMFs began recording percolation in mid-November, 7 days after the start of a prolonged precipitation event, and continued until early June 2006. Percolation flux during this period ranged between 3.1 x 10{sup -5} and 8.5 x 10{sup -5} cm s{sup -1}. The cumulative percolation was greater than total precipitation during the period, probably because of a water-harvesting effect. The WFMs were strategically placed in down-gradient positions on the cover top slope where water likely accumulated in a sand drainage layer. Routine monitoring at Lakeview shows that the ground water remains protected. LM plans to evaluate potential effects of high percolation rates in covers to ensure that disposal cells remain protective for the long term. (authors)

Waugh, J. [S.M. Stoller Corporation, Grand Junction, CO (United States); Smith, G. [GeoSmith Engineering, LLC, Grand Junction, CO (United States); Danforth, B. [Cordilleran Compliance Services, Inc., Grand Junction, CO (United States); Gee, G. [Pacific Northwest National Laboratory, Richland, WA (United States); Kothari, V.; Pauling, T. [U.S. Department of Energy Office of Legacy Management, Grand Junction, CO (United States)

2007-07-01T23:59:59.000Z

284

Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site in Lakeview, Oregon  

SciTech Connect (OSTI)

This Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site in Lake view, Oregon evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site.

Not Available

1994-10-01T23:59:59.000Z

285

Microsoft PowerPoint - To NETL Albany Site from Portland, Oregon...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Portland, Oregon Airport (PDX) 1. Take the AIRPORT EXIT RD. until it intersects I-205. 2. Follow I-205 SOUTH for 25 MILES to the intersection with I-5 SOUTH (Salem exit). 3. Follow...

286

What The Oregon Health Study Can Tell Us About Expanding Medicaid  

E-Print Network [OSTI]

The recently enacted Patient Protection and Affordable Care Act includes a major expansion of Medicaid to low-income adults in 2014. This paper describes the Oregon Health Study, a randomized controlled trial that will be ...

Allen, Heidi

287

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

288

Microsoft Word - CX-OregonCity-ChemawaWoodPolesFY12_WEB .docx  

Broader source: Energy.gov (indexed) [DOE]

31, 2012 REPLY TO ATTN OF: KEP-Alvey SUBJECT: Environmental Clearance Memorandum James Semrau Project Manager - TEP-TPP-1 Proposed Action: Oregon City-Chemawa 2 Wood Pole...

289

Overstory/understory relationships in old growth Grand fir habitat types of northeast Oregon  

E-Print Network [OSTI]

/understory relationships existing on northeast Oregon industrial forests. Greater understanding of the impact of silvicultural practices on forest fauna is needed. Information is also needed on how to acquire data to develop ecologically-based multi-resource management...

Schreder, Peter Todd

2012-06-07T23:59:59.000Z

290

GEOTHERMAL EXPLORATION ASSESSMENT AND INTERPRETATION, KLAMATH BASIN, OREGON-SWAN LAKE AND KLAMATH HILLS AREA  

E-Print Network [OSTI]

1966, Energy and power of geothermal resources: Dept. o fTelluric exploration for geothermal anomalies i n Oregon:Bowen, R.G. , 1972, Geothermal o v k i e w s of t h e '

Stark, M.

2011-01-01T23:59:59.000Z

291

Oregon Blazes the Trail to Energy Efficiency: Weatherization Assistance Close-Up Fact Sheet  

SciTech Connect (OSTI)

Oregon demonstrates its commitment to technology and efficiency through the Weatherization Program. Weatherization uses advanced technologies and techniques to reduce energy costs for low-income families by increasing the energy efficiency of their homes.

D& R International

2001-10-10T23:59:59.000Z

292

EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

293

Small Wind Electric Systems: An Oregon Consumer's Guide  

SciTech Connect (OSTI)

Small Wind Electric Systems: An Oregon Consumer's Guide provides consumers with information to help them determine whether a small wind electric system can provide all or a portion of the energy they need for their home or business based on their wind resource, energy needs, and economics. Topics include how to make a home more energy efficient, how to choose the correct turbine size, the parts of a wind electric system, how to determine whether enough wind resource exists, how to choose the best site for a turbine, how to connect a system to the utility grid, and whether it's possible to become independent of the utility grid using wind energy. In addition, the cover of the guide contains a list of contacts for more information.

Not Available

2007-08-01T23:59:59.000Z

294

U.S. hydropower resource assessment for Oregon  

SciTech Connect (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Oregon.

Conner, A.M.; Francfort, J.E.

1998-03-01T23:59:59.000Z

295

Oregon state information handbook: formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

296

Oregon state information handbook formerly utilized sites remedial action program  

SciTech Connect (OSTI)

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

297

Spring loaded locator pin assembly  

DOE Patents [OSTI]

This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece.

Groll, Todd A. (Idaho Falls, ID); White, James P. (Pocatelo, ID)

1998-01-01T23:59:59.000Z

298

Spring loaded locator pin assembly  

DOE Patents [OSTI]

This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece. 5 figs.

Groll, T.A.; White, J.P.

1998-03-03T23:59:59.000Z

299

EA-1992: Funding for Principle Power, Inc., for the WindFloat Pacific Offshore Wind Demonstration Project, offshore of Coos Bay, Oregon  

Broader source: Energy.gov [DOE]

Funding for Principle Power, Inc., for the WindFloat Pacific Offshore Wind Demonstration Project, offshore of Coos Bay, Oregon

300
Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


302

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

of Oregon (ETO), Bonneville and the Northwest Energy Efficiency Alliance (NEEA) to report improvements in industrial efficiency. The weatherization of low-income housing and improvements in irrigated. Eden Oregon Joan M. Dukes Oregon October 29, 2009 MEMORANDUM TO: Council Members FROM: Tom Eckman

303

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

SUBJECT: Presentation by Smart Grid Oregon Action items in the Council's Sixth Power Plan require and its operations. These changes often go under the name of "smart grid". One organization working to promote changes to the electricity grid is Smart Grid Oregon. Three members of the Smart Grid Oregon board

304

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

-Chair Oregon Bruce A. Measure Montana James A. Yost Idaho W. Bill Booth Idaho Henry Lorenzen Oregon Tom Karier federally-owned salmon hatcheries in Washington, Oregon, and Idaho, 2005-2010. The review examined 53 was to ensure that Service hatcheries operate in accordance with the best scientific information available

306

In 2005, Oregon State University established the Institute for Water and Watersheds as the hub for water-related  

E-Print Network [OSTI]

In 2005, Oregon State University established the Institute for Water and Watersheds as the hub 541-737-4032 The State Water Resources Research Institute for Oregon IWW funded a graduate student Winter Water Film Series to a packed house and to the 2009 State Legislature. It is currently scheduled

Escher, Christine

307

Geomorphic surfaces in the northwestern Klamath Mountains, California and Oregon  

SciTech Connect (OSTI)

Thick, residual, colluvial and alluvial soils derived from ophiolitic rocks mantle at least four geomorphic surfaces in the Siskiyou and marble mountains, in northwestern California and Illinois Valley, in southwestern Oregon. Analysis of digital elevation data provides constraints on the distribution and origin of these surfaces. Because of the geomorphic expression and soil mechanical properties of the surfaces, a map of slope gradients less than 22 degrees closely approximates the distribution of geomorphic surfaces as they are known from field observations. Preliminary definition of individual surfaces is based upon classification of the slop-map by elevation ranges. The Klamath Peneplain'' of Diller (1902) and associated soils, recently referred to as Klamath Saprolite'', are recognized near summit elevation (1,500 meters) across the area. Regional uplift and erosion has resulted in extensive, large earthflow landslides derived from these soils. Alluvial and residual deposits on the floor of the Illinois Valley occur at the same elevation (300 meters) as incised alluvial and colluvial terrace deposits along the Klamath River and tributary streams. At least two additional surfaces have been identified in the Siskiyou and Marble Mountains at approximately elevation 750 and 1,000 meters. Analysis of digital elevation data, combined with the map of earthflow landslides, allows rapid preliminary mapping of geomorphic surfaces in this terrain.

Baldwin, K.S. (Forest Service, Happy Camp, CA (United States)); Ricks, C.L. (Forest Service, Gold Beach, OR (United States))

1993-04-01T23:59:59.000Z

308

Hood River Passive House, Hood River, Oregon (Fact Sheet)  

SciTech Connect (OSTI)

The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to "reduce home energy use by 30%-50%" (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

Not Available

2014-02-01T23:59:59.000Z

309

Mobile Alternative Fueling Station Locator  

SciTech Connect (OSTI)

The Department of Energy's Alternative Fueling Station Locator is available on-the-go via cell phones, BlackBerrys, or other personal handheld devices. The mobile locator allows users to find the five closest biodiesel, electricity, E85, hydrogen, natural gas, and propane fueling sites using Google technology.

Not Available

2009-04-01T23:59:59.000Z

310

Data Center Energy Efficiency and Renewable Energy Site Assessment: Anderson Readiness Center; Salem, Oregon  

SciTech Connect (OSTI)

This report summarizes the results from the data center energy efficiency and renewable energy site assessment conducted for the Oregon Army National Guard in Salem, Oregon. A team led by NREL conducted the assessment of the Anderson Readiness Center data centers March 18-20, 2014 as part of ongoing efforts to reduce energy use and incorporate renewable energy technologies where feasible. Although the data centers in this facility account for less than 5% of the total square footage, they are estimated to be responsible for 70% of the annual electricity consumption.

Metzger, I.; Van Geet, O.

2014-06-01T23:59:59.000Z

311

Location-aware active signage  

E-Print Network [OSTI]

Three-dimensional route maps, which depict a path from one location to another, can be powerful tools for visualizing and communicating directions. This thesis presents a client-server architecture for generating and ...

Nichols, Patrick James, 1981-

2004-01-01T23:59:59.000Z

312

CX-010180: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

CX(s) Applied: A9 Date: 04252013 Location(s): Other Location Offices(s): National Energy Technology Laboratory Develop a predictive turbulent combustion model that is...

313

Coseismic slip on the southern Cascadia megathrust implied by tsunami deposits in an Oregon lake  

E-Print Network [OSTI]

equations on unstructured grids. Our simulations of the 1700 Cascadia tsunami require >12­13 m of peak slip on the southern Cascadia megathrust offshore southern Oregon. The simulations account for tidal and shoreline and Gorda plates descend beneath North America at $40 mm yr�1 [DeMets et al., 2010] (Figure 1a). Along

Goldfinger, Chris

314

RELATIONSHIPS OF THE FISH FAUNA OF THE LAKES OF SOUTHEASTERN OREGON  

E-Print Network [OSTI]

of the lakes and streams in southern Oregon, leaving Ashland, Oreg., July 15 with camping outfit and remaining Ashland on the west and the Warner Lakes on the east. The entire distance traveled by this party exceeded, of Ashland, Oreg. bComposed of the writer, 1'1'01. E. C. starke, and Messrs. E. L. Morris and J. D. Snyder

315

WEATHERIZATION INDUSTRIES SAVE ENERGY ST SE SALEM, OREGON 97301 (503) 5691381 WEATHERIZATIONALLIES@GMAIL.COM  

E-Print Network [OSTI]

to be energy efficient. BPA's current standard is a U-.30. By 2015, current products will certainly be obsoleteWEATHERIZATION INDUSTRIES SAVE ENERGY 565 21ST ST SE SALEM, OREGON 97301 · (503) 5691381 AND CONSERVATION COUNCIL'S CONSERVATION PLANNING ASSUMPTIONS Weatherization Industries Save Energy (WISE

316

Oregon Sea Grant Marine Education Program at Hatfield Marine Science Center Fish Dissection  

E-Print Network [OSTI]

Oregon Sea Grant Marine Education Program at Hatfield Marine Science Center Fish Dissection The Fish Dissection program at Hatfield Marine Science Center is a 50-minute hands-on program for 4th through 12th grade students. Students will work in small groups as they examine a variety of fish, study

Wright, Dawn Jeannine

317

A dye tracer reveals cross-shelf dispersion and interleaving on the Oregon shelf  

E-Print Network [OSTI]

A dye tracer reveals cross-shelf dispersion and interleaving on the Oregon shelf A. C. Dale,1 M. D December 2005; published 3 February 2006. [1] A fluorescent dye tracer was injected into the pycnocline the other in the water column, split by interleaving dye-free water. The vertical scale of these layers

Kurapov, Alexander

318

Large wood recruitment and redistribution in headwater streams in the southern Oregon Coast  

E-Print Network [OSTI]

Large wood recruitment and redistribution in headwater streams in the southern Oregon Coast Range, U.S.A.1 Christine L. May and Robert E. Gresswell Abstract: Large wood recruitment and redistribution and topographic setting strongly influenced processes that delivered wood to the channel network. In small

May, Christine L.

319

Protecting Oregon Old-Growth Forests from Fires: How Much Is It Worth?1  

E-Print Network [OSTI]

), but not for protecting these old-growth ecosystems from fire. The USDI Fish and Wildlife Service has designated about 2 (Gregory and von Winterfeldt 1992). This paper describes the performance of contingent valuation method) for protecting old-growth forests in Oregon from catastrophic fires. Methods Contingent valuation is a widely

Standiford, Richard B.

320

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

INTO OREGON STATE UNIVERSITY CONTINUED SUCCESS SCHOLARSHIP COPY of the TERMS AND CONDITIONS  

E-Print Network [OSTI]

INTO OREGON STATE UNIVERSITY CONTINUED SUCCESS SCHOLARSHIP COPY of the TERMS AND CONDITIONS of the INTO OSU Continued Success Scholarship. This award cannot be used in conjunction with the International: INTO OSU Continued Success Scholarship recipients may be eligible for a $6,000 scholarship after successful

Escher, Christine

322

Oregon's Restoration Economy Restoring watersheds is a starting point for a  

E-Print Network [OSTI]

15 20 25 30 Restoration: Labor-intensive Restoration: Average Transportation Infrastructure Energy activity in communities around Oregon, today and into the future. "As the restoration economy blossoms in natural assets for the benefit of communities and salmon Oxbow Mine Tailings Restoration Project, Middle

323

NEAR-SURFACE HYDROLOGIC RESPONSE FOR A STEEP, UNCHANNELED CATCHMENT NEAR COOS BAY, OREGON: 2.  

E-Print Network [OSTI]

con- trolled sprinkling experiments at the Coos Bay 1 (CB1) experimental catchment in the Oregon Coast indicate that the 3D geometry and hydraulic characteris- tics of the layered geologic interfaces at CB1 can-rock hydraulic properties that preclude accurate fracture flow representation. Sensitivity analyses for the CB1

Montgomery, David R.

324

Using Layered Manufacturing for Scientific Visualization Mike Bailey, Oregon State University  

E-Print Network [OSTI]

Manufacturing, on the other hand, is characterized by additive manufacturing processes. They start with nothing, but there are significant advantages to additive manufacturing for scientific visualization: · Extremely complex parts can1 Using Layered Manufacturing for Scientific Visualization Mike Bailey, Oregon State University

Bailey, Mike

325

The Economic Impact of Oregon's Urban Research University $1.4 billion and growing  

E-Print Network [OSTI]

The Economic Impact of Oregon's Urban Research University $1.4 billion and growing #12;From this in the face of tough economic times. This report offers a snapshot of the economic benefits Portland State are an economic catalyst through our partnerships, our research and our programs. Continue to expect great things

Bertini, Robert L.

326

851 S.W. Sixth Avenue, Suite 1100 Portland, Oregon 97204-1348  

E-Print Network [OSTI]

on building construction, energy design guides, schools audits, and the Commercial Building Stock Assessment Measures ­ Schools I. GENERAL INFORMATION Reducing barriers to energy efficiency program participation;2 B. Assess technical savings potential Using Oregon, Idaho and Montana schools audit data (made

327

EA-1974: Wallooskee-Youngs Confluence Restoration Project, Clatsop County, Oregon  

Broader source: Energy.gov [DOE]

Draft EA: Public Comment Period Ends 01/28/15Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed restoration of a tidal marsh in the Columbia River Estuary, near Astoria in Clatsop County, Oregon. The project website is https://www.bpa.gov/goto/WallooskeeYoungs.

328

Status Review of Wildlife Mitigation at Columbia Basin Hydroelectric Projects, Oregon Facilities, Final Report.  

SciTech Connect (OSTI)

The report presents a review and documentation of existing information on wildlife resources at Columbia River Basin hydroelectric facilities within Oregon. Effects of hydroelectric development and operation; existing agreements; and past, current and proposed wildlife mitigation, enhancement, and protection activities were considered. (ACR)

Bedrossian, Karen L.

1984-08-01T23:59:59.000Z

329

Partnership ofPartnership of Oregon Dept. of Fish and Wildlife,  

E-Print Network [OSTI]

Partnership ofPartnership of Oregon Dept. of Fish and Wildlife, Washington Dept. of Fish for compensatory predation by smallmouth bass and walleye. 4 Evaluate effect of program on salmonid4. Evaluate 4 Decreased amount of older/larger fish4. Decreased amount of older/larger fish. 5. Reduced

330

Oregon State University Department of Nuclear Engineering & Radiation Health Physics NeutronSpring 2011  

E-Print Network [OSTI]

THE Oregon State University Department of Nuclear Engineering & Radiation Health Physics Neutron's Study Abroad Program. Arnold will earn a B.S. in Nuclear Engineering with a minor in French when she graduates this spring. INSIDE Why would a nuclear engineering student add a French minor to an already

Tullos, Desiree

331

An Exploration of Bicycle-Motor Vehicle Crash Types and Causes in Portland-Metro, Oregon  

E-Print Network [OSTI]

An Exploration of Bicycle-Motor Vehicle Crash Types and Causes in Portland-Metro, Oregon by Kouros. This research project investigates ways to improve traffic safety, focusing specifically on bicycle- motor of BMV crashes resulted in fatal injury and 127 of resulted in incapacitating injury. Each bicycle crash

Bertini, Robert L.

332

Synchronized sampling improves fault location  

SciTech Connect (OSTI)

Transmission line faults must be located accurately to allow maintenance crews to arrive at the scene and repair the faulted section as soon as possible. Rugged terrain and geographical layout cause some sections of power transmission lines to be difficult to reach. In the past, a variety of fault location algorithms were introduced as either an add-on feature in protective relays or stand-alone implementation in fault locators. In both cases, the measurements of current and voltages were taken at one terminal of a transmission line only. Under such conditions, it may become difficult to determine the fault location accurately, since data from other transmission line ends are required for more precise computations. In the absence of data from the other end, existing algorithms have accuracy problems under several circumstances, such as varying switching and loading conditions, fault infeed from the other end, and random value of fault resistance. Most of the one-end algorithms were based on estimation of voltage and current phasors. The need to estimate phasors introduces additional difficulty in high-speed tripping situations where the algorithms may not be fast enough in determining fault location accurately before the current signals disappear due to the relay operation and breaker opening. This article introduces a unique concept of high-speed fault location that can be implemented either as a simple add-on to the digital fault recorders (DFRs) or as a stand-alone new relaying function. This advanced concept is based on the use of voltage and current samples that are synchronously taken at both ends of a transmission line. This sampling technique can be made readily available in some new DFR designs incorporating receivers for accurate sampling clock synchronization using the satellite Global Positioning System (GPS).

Kezunovic, M. [Texas A and M Univ., College Station, TX (United States)] [Texas A and M Univ., College Station, TX (United States); Perunicic, B. [Lamar Univ., Beaumont, TX (United States)] [Lamar Univ., Beaumont, TX (United States)

1995-04-01T23:59:59.000Z

333

Location logistics of industrial facilities  

E-Print Network [OSTI]

of company intent1ons is not made at the correct time and in the correct manner. 6. Recommend Best Areas for Further Invest1 ations. Once the on-site evaluations have been completed, the 11st of possibilities is reduced still further and only the best... location and site selection. This data was gathered through library research, atten- dance of various industr1al development conferences, sol1citation of mater1als from individuals currently involved with industrial facil1ties location, and various...

Hammack, William Eugene

1981-01-01T23:59:59.000Z

334

M.S. Economic Geology, Oregon State University College of Earth, Ocean, and Atmospheric Sciences, Corvallis, OR Expected Spring, 2015  

E-Print Network [OSTI]

EDUCATION M.S. Economic Geology, Oregon State University College of Earth, Ocean. Dilles Relevant Courses Interpretation of Geologic Maps Igneous Petrology Tectonic Geomorphology B.S. Geology, University of Idaho College of Science, Moscow, ID; GPA: 3

Kurapov, Alexander

335

The Cost of Caution: Tobacco Industry Political Influence and Tobacco Policy Making in Oregon 1997-2007  

E-Print Network [OSTI]

Is Oregon going up in smoke? Ashland Daily Tidings, May 17,Rep. Peter Buckley (D-Ashland) Rep. Tom Butler (R-Ontario)Rep. Judy Uherbelau (D-Ashland) Rep. Cherryl Walker (R-

Kristen Lum; Stanton A. Glantz, PhD

2007-01-01T23:59:59.000Z

336

The Impact of Medicaid on Labor Market Activity and Program Participation: Evidence from the Oregon Health Insurance Experiment  

E-Print Network [OSTI]

In 2008, a group of uninsured low-income adults in Oregon was selected by lottery for the chance to apply for Medicaid. Using this randomized design and 2009 administrative data, we find no significant effect of Medicaid ...

Baicker, Katherine

337

This presentation was given to the Native Plant Society, Siskiyou Chapter, Southern Oregon University, 21 Oct. 2010.  

E-Print Network [OSTI]

This presentation was given to the Native Plant Society, Siskiyou Chapter, Southern Oregon of continents, roughly between 30 and 40 degrees latitude, where cold offshore ocean current is present [1

Muir, Patricia

338

Boston, Massachusetts Location: Boston, MA  

E-Print Network [OSTI]

-recovery ventilation and water-source heat pumps Each unit has fresh air ducted independently. Each residence is warmed by a heat pump that taps the Trigen Energy Corporation steam lines that run underneath the street. #12;WallsBoston, Massachusetts #12;Location: Boston, MA Building type(s): Multi-unit residential, Retail 350

Prevedouros, Panos D.

339

Building Address Locations -Assumes entire  

E-Print Network [OSTI]

Building Address Locations - Assumes entire building unless noted Designation Submit through* 560, 4 BU Crosstown Center 801 Massachusetts Ave Floor 1, 2 BMC BCD Building 800 Harrison Avenue BCD BMC Biosquare III 670 Albany Floors 2, 3, 6, 7 BMC Biosquare III 670 Albany Floors 1, 4, 5, 8 BU Building

Guenther, Frank

340

CX-010345: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Determination CX-010345: Categorical Exclusion Determination North Bend District Wood Poles CX(s) Applied: B1.3 Date: 05092013 Location(s): Oregon, Oregon, Oregon...

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

Oregon Bruce A. Measure Montana Rhonda Whiting Montana May 3, 2007 MEMORANDUM TO: Power Committee FROM begins developing guidelines for interpreting regional energy and capacity adequacy standards

342

Northeast Oregon Hatchery Spring Chinook Master Plan, Technical Report 2000.  

SciTech Connect (OSTI)

Spring chinook salmon populations in the Imnaha and Grande Ronde rivers are listed as threatened under the Endangered Species Act (ESA) and are at high risk of extirpation. The Nez Perce Tribe, the Confederated Tribes of the Umatilla Indian Reservation, and Oregon Department of Fish and Wildlife, are co-managers of conservation/restoration programs for Imnaha and Grande Ronde spring chinook salmon that use hatchery supplementation and conventional and captive broodstock techniques. The immediate goal of these programs is to prevent extirpation and provide the potential for restoration once factors limiting production are addressed. These programs redirect production occurring under the Lower Snake River Compensation Plan (LSRCP) from mitigation to conservation and restoration. Both the Imnaha and Grande Ronde conservation/restoration programs are described in ESA Section 10 permit applications and the co-managers refer to the fish production from these programs as the Currently Permitted Program (CPP). Recently, co-managers have determined that it is impossible to produce the CPP at Lookingglass Hatchery, the LSRCP facility intended for production, and that without additional facilities, production must be cut from these conservation programs. Development of new facilities for these programs through the Columbia Basin Fish and Wildlife Program is considered a new production initiative by the Northwest Power Planning Council (NPPC) and requires a master plan. The master plan provides the NPPC, program proponents and others with the information they need to make sound decisions about whether the proposed facilities to restore salmon populations should move forward to design. This master plan describes alternatives considered to meet the facility needs of the CPP so the conservation program can be fully implemented. Co-managers considered three alternatives: modify Lookingglass Hatchery; use existing facilities elsewhere in the Basin; and use new facilities in conjunct ion with a modified Lookingglass Hatchery. Each alternative was evaluated based on criteria developed for rearing fish for a conservation program. After this review, the Nez Perce Tribe determined the only alternative that meets the needs of the program is the alternative to use new facilities in conjunction with a modified Lookingglass Hatchery. This is the Proposed Alternative. The Proposed Alternative would require: Construction of a new incubation and rearing facility in the Imnaha River and modifications of the existing Gumboot facility to accommodate the Imnaha component of the Lookingglass Hatchery production; Construction of a new incubation and rearing facility in the Lostine River to accommodate the Lostine component of the Lookingglass Hatchery production; and Modifications at Lookingglass Hatchery to accommodate the Upper Grande Ronde and Catherine Creek components of the Lookingglass Hatchery production. After an extensive screening process of potential sites, the Nez Perce Tribe proposes the Marks Ranch site on the Imnaha River and the Lundquist site on the Lostine River for new facilities. Conceptual design and cost estimates of the proposed facilities are contained in this master plan. The proposed facilities on the Imnaha and Lostine rivers would be managed in conjunction with the existing adult collection and juvenile acclimation/release facilities. Because this master plan has evolved into an endeavor undertaken primarily by the Nez Perce Tribe, the focus of the document is on actions within the Imnaha and Lostine watersheds where the Nez Perce Tribe have specific co-management responsibilities. Nevertheless, modifications at Lookingglass Hatchery could make it possible to provide a quality rearing environment for the remainder of the CPP. The Nez Perce Tribe will assist co-managers in further evaluating facility needs and providing other components of the NPPC master planning process to develop a solution for the entire CPP. Although the fish production for the conservation programs is already authorized and not at issue in this master pla

Ashe, Becky L.; Concannon, Kathleen; Johnson, David B.

2000-04-01T23:59:59.000Z

343

STUDEN T FIN ANCIAL AID AND SCHO LARSHIP S SE RVICE SUPPO RT SUCC ESS 1278 University of Oregon, Eugene OR 97403-1278 http://financialaid.uoregon.edu  

E-Print Network [OSTI]

STUDEN T FIN ANCIAL AID AND SCHO LARSHIP S SE RVICE SUPPO RT SUCC ESS 1278 University of Oregon #12;STUDEN T FIN ANCIAL AID AND SCHO LARSHIP S SE RVICE SUPPO RT SUCC ESS 1278 University of Oregon

Oregon, University of

344

Assessing student reasoning in upper-division electricity and magnetism at Oregon State University  

E-Print Network [OSTI]

Standardized assessment tests that allow researchers to compare the performance of students under various curricula are highly desirable. There are several research-based conceptual tests that serve as instruments to assess and identify students' difficulties in lower-division courses. At the upper-division level, however, assessing students' difficulties is a more challenging task. Although several research groups are currently working on such tests, their reliability and validity are still under investigation. We analyze the results of the Colorado Upper-Division Electrostatics diagnostic from Oregon State University and compare it with data from University of Colorado. In particular, we show potential shortcomings in the Oregon State University curriculum regarding separation of variables and boundary conditions, as well as uncover weaknesses of the rubric to the free response version of the diagnostic. We also demonstrate that the diagnostic can be used to obtain information about student learning during ...

Zwolak, Justyna P

2015-01-01T23:59:59.000Z

345

Site Location of Development Act (Maine)  

Broader source: Energy.gov [DOE]

The Site Location of Development Act regulates the locations chosen for state, municipal, quasi-municipal, educational, charitable, commercial and industrial developments with respect to the...

346

Persistent Uniform Resource Locators (PURLs) | Scientific and...  

Office of Scientific and Technical Information (OSTI)

Locators (PURLs) Print page Print page PURLs (Persistent Uniform Resource Locators) are Web addresses that act as permanent identifiers in the face of a dynamic and changing Web...

347

Energy Department Launches Alternative Fueling Station Locator...  

Broader source: Energy.gov (indexed) [DOE]

Launches Alternative Fueling Station Locator App Energy Department Launches Alternative Fueling Station Locator App November 7, 2013 - 11:16am Addthis As part of the Obama...

348

CX-007613: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Next Generation Ultra Lean Burn Powertrain CX(s) Applied: A9 Date: 01/10/2012 Location(s): California Offices(s): National Energy Technology Laboratory

349

CX-010951: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Automotive Technology Analysis CX(s) Applied: A8 Date: 09/17/2013 Location(s): Virginia Offices(s): National Energy Technology Laboratory

350

CX-009365: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

A9 Date: 09182012 Location(s): Kansas Offices(s): National Energy Technology Laboratory Engineering services will be conducted at the Berexco offices. CX-009365.pdf More...

351

CX-010863: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Thermal Diffusivity Evaluation CX(s) Applied: B3.6 Date: 07/02/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

352

CX-012002: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Raver-Covington Conductor Replacement CX(s) Applied: B1.3 Date: 04/24/2014 Location(s): Washington Offices(s): Bonneville Power Administration

353

CX-010532: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Various Demolition Jobs CX(s) Applied: B1.23 Date: 06/07/2013 Location(s): Illinois Offices(s): Fermi Site Office

354

CX-011194: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Particle Physics Division Outback Garage CX(s) Applied: B1.15 Date: 09/19/2013 Location(s): Illinois Offices(s): Fermi Site Office

355

CX-008264: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Compressed Natural Gas Fueling Facility CX(s) Applied: A1 Date: 05/24/2012 Location(s): Missouri Offices(s): National Energy Technology Laboratory

356

CX-008468: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Compressed Natural Gas Fueling Facility CX(s) Applied: A1 Date: 06/12/2012 Location(s): Missouri Offices(s): National Energy Technology Laboratory

357

CX-007382: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Compressed Natural Gas Manufacturing CX(s) Applied: B5.1 Date: 10/26/2011 Location(s): Wisconsin Offices(s): Golden Field Office

358

CX-008556: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Haiti Renewable Resource Study CX(s) Applied: A9, A11 Date: 07/23/2012 Location(s): Haiti Offices(s): Golden Field Office

359

CX-012097: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Microgrid Demonstration Project CX(s) Applied: B5.15 Date: 03/24/2014 Location(s): Idaho Offices(s): Idaho Operations Office

360

CX-008234: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Whole Energy Glycerin Refinery CX(s) Applied: B5.15 Date: 04/20/2012 Location(s): Washington Offices(s): Golden Field Office

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

CX-009702: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Categorical Exclusion Determination Columbia Rural Electric Association Walla Walla Hydroelectric Project CX(s) Applied: B4.1 Date: 12212012 Location(s): Washington Offices(s):...

362

CX-012266: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Characterization of Pliocene and Miocene Formations in the Wilmington Graben, Offshore Los Angeles... CX(s) Applied: A9 Date: 06262014 Location(s): California Offices(s):...

363

CX-009210: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Silver Butte Fiber Burial Project CX(s) Applied: B.47 Date: 08/28/2012 Location(s): Montana, Montana Offices(s): Bonneville Power Administration

364

CX-012189: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Microbial Laboratory Analysis CX(s) Applied: B3.12 Date: 05/06/2014 Location(s): Illinois Offices(s): Argonne Site Office

365

CX-011214: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Sensitive Instrument Facility CX(s) Applied: B3.6 Date: 07/10/2013 Location(s): Iowa Offices(s): Ames Site Office

366

CX-009272: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Building 94 Facade Restoration CX(s) Applied: B1.3 Date: 09/10/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory

367

CX-007794: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Grandview, Arkansas Interconnection CX(s) Applied: B4.12 Date: 04/08/2011 Location(s): Arkansas Offices(s): Southwestern Power Administration

368

CX-010237: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Pittsburgh Green Innovators Synergy Center CX(s) Applied: A9 Date: 02/28/2013 Location(s): Pennsylvania Offices(s): Golden Field Office

369

CX-009419: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Magnetic Pulser CX(s) Applied: None applied. Date: 10/30/2012 Location(s): Missouri Offices(s): Kansas City Site Office

370

CX-012038: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Deepwater Reverse-Circulation Primary Cementing CX(s) Applied: A9 Date: 04/17/2014 Location(s): Texas Offices(s): National Energy Technology Laboratory

371

CX-008291: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Applied: B5.22 Date: 05012012 Location(s): North Carolina Offices(s): National Energy Technology Laboratory Install biodiesel fueling infrastructure in Wake Forest, North...

372

CX-008517: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Applied: B5.22 Date: 07122012 Location(s): North Carolina Offices(s): National Energy Technology Laboratory Install biodiesel fueling infrastructure in Wilmington, North...

373

CX-008700: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Natapoc Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration

374

CX-009118: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

2012 Location(s): South Carolina Offices(s): Savannah River Operations Office Savannah River National Laboratory has been requested to qualify the next batch of sludge for...

375

CX-010491: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

2013 Location(s): South Carolina Offices(s): Savannah River Operations Office Savannah River National Laboratory has been requested to perform analyses and decay projections for...

376

CX-011500: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

2013 Location(s): South Carolina Offices(s): Savannah River Operations Office Savannah River National Laboratory (SRNL) will receive a variety of routine samples from the...

377

CX-009082: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

2012 Location(s): South Carolina Offices(s): Savannah River Operations Office Savannah River National Laboratory will perform grout formulation and variability studies. "...

378

CX-007661: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

2011 Location(s): South Carolina Offices(s): Savannah River Operations Office Savannah River National Laboratory will perform grout formulation and variability studies....

379

CX-007965: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

2012 Location(s): South Carolina Offices(s): Savannah River Operations Office Savannah River National Laboratory will perform grout formulation and variability studies....

380

CX-010653: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

2013 Location(s): South Carolina Offices(s): Savannah River Operations Office Savannah River National Laboratory will perform a study of how parameters influenced by Defense...

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

CX-011534: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Grays River Confluence Property Funding CX(s) Applied: B1.25 Date: 11/08/2013 Location(s): Washington Offices(s): Bonneville Power Administration

382

CX-010751: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Solar Ready 2 CX(s) Applied: A9, A11 Date: 08/15/2013 Location(s): Missouri Offices(s): Golden Field Office

383

CX-011215: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Nepese Marsh Upgrades CX(s) Applied: B2.5 Date: 10/17/2013 Location(s): Illinois Offices(s): Fermi Site Office

384

CX-010880: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Access Road Acquisition Project CX(s) Applied: B1.24 Date: 07252013 Location(s): Oklahoma Offices(s): Southwestern Power Administration Southwestern Power Administration...

385

CX-010716: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Access Road Easement Acquisition CX(s) Applied: B1.24 Date: 07222013 Location(s): Oklahoma Offices(s): Southwestern Power Administration Southwestern Power Administration...

386

CX-007788: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Line 3016, Structure 31 CX(s) Applied: B1.33 Date: 12292011 Location(s): Oklahoma Offices(s): Southwestern Power Administration Southwestern Power Administration...

387

CX-011679: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Antifoam Degradation Testing CX(s) Applied: B3.6 Date: 12/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

388

CX-009923: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Project Icebreaker CX(s) Applied: A9, B3.1 Date: 01/07/2013 Location(s): Ohio Offices(s): Golden Field Office

389

CX-009132: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Landfill Gas Utilization Plant CX(s) Applied: B5.21 Date: 08/02/2012 Location(s): New York Offices(s): Golden Field Office

390

CX-012310: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Sawmill Creek Stream Bank Erosion CX(s) Applied: B1.3 Date: 06/06/2014 Location(s): Illinois Offices(s): Argonne Site Office

391

CX-011531: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Targhee Substation Land Acquisition CX(s) Applied: B1.24 Date: 11/05/2013 Location(s): Idaho Offices(s): Bonneville Power Administration

392

CX-011634: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Closure Turf Installation CX(s) Applied: B6.1 Date: 08/27/2013 Location(s): Texas Offices(s): Pantex Site Office

393

CX-011165: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Heavy Mineral Separation CX(s) Applied: B3.6 Date: 08/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

394

CX-009418: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Electron Beam Melting CX(s) Applied: None applied. Date: 10/30/2012 Location(s): Missouri Offices(s): Kansas City Site Office

395

CX-010717: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Moodys Radio Tower Land Acquisition CX(s) Applied: B1.24 Date: 07/15/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration

396

CX-011416: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Technology Integration Program CX(s) Applied: A9, A11 Date: 12/19/2013 Location(s): Ohio Offices(s): National Energy Technology Laboratory

397

CX-010778: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Technology Integration Program CX(s) Applied: A9, A11 Date: 08/23/2013 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory

398

CX-010582: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Spring Creek Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration

399

CX-010583: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Upper Jocko River Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration

400

CX-011402: Categorical Exclusion Determination | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Categorical Exclusion Determination CX-011402: Categorical Exclusion Determination Apel Steel Corporation CX(s) Applied: B5.16 Date: 11072013 Location(s): Alabama Offices(s):...

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

CX-011019: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

2013 Location(s): Washington Offices(s): National Energy Technology Laboratory Computational modeling of magnesium corrosion. CX-011019.pdf More Documents & Publications CX-011018...

402

CX-009552: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Central Vermont Recovered Biomass Facility CX(s) Applied: B5.20 Date: 11/28/2012 Location(s): Vermont Offices(s): Golden Field Office

403

CX-012317: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

High Performance Computing Upgrades CX(s) Applied: B1.31 Date: 06/16/2014 Location(s): Idaho Offices(s): Nuclear Energy

404

CX-008545: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Solar Energy Evolution and Diffusion Studies CX(s) Applied: A9 Date: 06/19/2012 Location(s): CX: none Offices(s): Golden Field Office

405

CX-012195: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Alfalfa Substation Control House Replacement CX(s) Applied: B4.11 Date: 05/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration

406

CX-009513: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Aquatic Invasive Mussels Monitoring CX(s) Applied: B3.1 Date: 10/15/2012 Location(s): CX: none Offices(s): Bonneville Power Administration

407

CX-012188: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Emerald Ash Borer Control CX(s) Applied: B1.3 Date: 05/06/2014 Location(s): Illinois Offices(s): Argonne Site Office

408

CX-010770: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Wildland Fire Chainsaw Training CX(s) Applied: B1.2 Date: 08/01/2013 Location(s): Idaho Offices(s): Nuclear Energy

409

CX-008984: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

State Energy Program CX(s) Applied: A9, A11 Date: 08/29/2012 Location(s): Florida Offices(s): Golden Field Office

410

CX-008341: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

A-6 Office Building CX(s) Applied: B1.15 Date: 04/19/2012 Location(s): Pennsylvania Offices(s): Naval Nuclear Propulsion Program

411

CX-007777: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Determination CX-007777: Categorical Exclusion Determination Disconnection of Utilities CX(s) Applied: B1.27 Date: 01132012 Location(s): Washington Offices(s): River...

412

CX-010772: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Water Security Test Bed (WSTB) CX(s) Applied: B3.6 Date: 07/17/2013 Location(s): Idaho Offices(s): Nuclear Energy

413

CX-012172: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Repackage Lead Shot CX(s) Applied: B6.1 Date: 04/14/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

414

CX-008168: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Snohomish High School Field Improvements CX(s) Applied: B4.9 Date: 03/20/2012 Location(s): Washington Offices(s): Bonneville Power Administration

415

CX-011564: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Excess Facilities Deactivation and Demolition CX(s) Applied: B1.23 Date: 11/05/2013 Location(s): Idaho Offices(s): Idaho Operations Office

416

CX-008215: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Small Hydropower Research and Development Technology Project CX(s) Applied: A9 Date: 04/03/2012 Location(s): Colorado Offices(s): Golden Field Office

417

CX-012313: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Chicago Office Technical Support Services Contract CX(s) Applied: A8 Date: 06/13/2014 Location(s): CX: none Offices(s): Chicago Office

418

CX-010258: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Bangladesh Meteorological Instrumentation Installation CX(s) Applied: A9 Date: 04/26/2013 Location(s): Colorado Offices(s): Golden Field Office

419

CX-009005: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Henderson Solar Energy Project CX(s) Applied: B5.16 Date: 08/22/2012 Location(s): Nevada Offices(s): Golden Field Office

420

CX-009718: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

12112012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office Manufacturer shall provide the piping and fittings associated with the replacement of the brine...

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

CX-007549: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Harrisonville - Waste Water Treatment Plant CX(s) Applied: B5.1 Date: 01/10/2012 Location(s): Missouri Offices(s): Golden Field Office

422

CX-007571: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Pulaski County - Wastewater CX(s) Applied: B5.1 Date: 12/29/2011 Location(s): Missouri Offices(s): Golden Field Office

423

CX-008691: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Mason Substation Metering Replacement Project CX(s) Applied: B1.7 Date: 06/25/2012 Location(s): Washington Offices(s): Bonneville Power Administration

424

CX-009635: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

INTEC – U-233 Waste Stream Disposition CX(s) Applied: NO CX GIVEN Date: 12/15/2012 Location(s): Idaho Offices(s): Idaho Operations Office

425

CX-008898: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

2012 Location(s): Georgia Offices(s): Energy Efficiency and Renewable Energy 1) Develop air quality campaign including pollution prevention audits for small businesses, weather...

426

CX-009426: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Auxiliary Services Hydrogen Refueling Facility Performance Evaluation and Optimization CX(s) Applied: A9, B5.22 Date: 10242012 Location(s): California Offices(s):...

427

CX-010124: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Chromatography / Mass Spectrometry CX(s) Applied: B3.6 Date: 03/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

428

CX-009617: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Gas Mass Spectrometry CX(s) Applied: B3.6 Date: 11/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

429

CX-008465: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Location(s): Indiana Offices(s): National Energy Technology Laboratory Develop an optical sensor to monitor in-situ gasifier conditions. Under this cooperative agreement,...

430

CX-011401: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Minto Lodge Rehabilitation CX(s) Applied: B5.1 Date: 11/19/2013 Location(s): Alaska Offices(s): Golden Field Office

431

CX-007836: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Building Retrofits CX(s) Applied: B5.19 Date: 01/30/2012 Location(s): Illinois Offices(s): Energy Efficiency and Renewable Energy

432

CX-012110: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Cowlitz Falls Fish Facility Access Agreement Extension CX(s) Applied: A2 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration

433

CX-008588: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

St. Petersburg Solar Pilot Project CX(s) Applied: B5.1 Date: 07/19/2012 Location(s): Florida Offices(s): Golden Field Office

434

CX-008684: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Metaline Radio Station Upgrade Project CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Washington Offices(s): Bonneville Power Administration

435

CX-009420: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Additive Manufacturing Using EOSINT M280 CX(s) Applied: None applied. Date: 10/30/2012 Location(s): Missouri Offices(s): Kansas City Site Office

436

CX-010739: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Exclusion Determination CX-010739: Categorical Exclusion Determination Golden State Solar Impact CX(s) Applied: A9, A11 Date: 08152013 Location(s): California Offices(s):...

437

CX-011535: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

East Grangeville Substation Sale CX(s) Applied: B1.24 Date: 11/14/2013 Location(s): Idaho Offices(s): Bonneville Power Administration

438

CX-012233: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Shed Acquisition at Kalispell Substation CX(s) Applied: B1.24 Date: 06/09/2014 Location(s): Montana Offices(s): Bonneville Power Administration

439

CX-009543: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Sopogy Subcontract CX(s) Applied: A9, B5.15 Date: 11/28/2012 Location(s): Hawaii Offices(s): Golden Field Office

440

CX-010581: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Little Shell Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

CX-010105: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Line Danger Tree Management CX(s) Applied: B1.3 Date: 03262013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power...

442

CX-009800: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Line Danger Tree Management CX(s) Applied: B1.3 Date: 01152013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power...

443

CX-011115: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Realization of Algae Potential CX(s) Applied: A9 Date: 08/29/2013 Location(s): New Mexico Offices(s): Golden Field Office

444

CX-007844: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Energy Retrofits CX(s) Applied: B5.1 Date: 12/01/2011 Location(s): Rhode Island Offices(s): Energy Efficiency and Renewable Energy

445

CX-012122: Categorical Exclusion Determination  

Office of Energy Efficiency and Renewable Energy (EERE)

OCGen Module Mooring Project CX(s) Applied: B5.25 Date: 04/29/2014 Location(s): Maine Offices(s): Golden Field Office

446

CX-011707: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Laser Nanoparticle Lab CX(s) Applied: B3.6 Date: 01/15/2014 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory

447

CX-007407: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Advanced Floating Turbine CX(s) Applied: A9 Date: 12/07/2011 Location(s): Ohio Offices(s): Golden Field Office

448

CX-008535: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

King County Biogas and Nutrient Reduction CX(s) Applied: A9 Date: 05/22/2012 Location(s): Washington Offices(s): Golden Field Office

449

CX-008826: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Categorical Exclusion Determination Remanufacture, Transport, and Install BHTX-29 Transformer CX(s) Applied: B1.3 Date: 07172012 Location(s): Texas Offices(s): Strategic...

450

CX-012054: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Catalyst Synthesis CX(s) Applied: B3.6 Date: 03/18/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

451

CX-010514: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Center for Nanoscale Energy CX(s) Applied: B3.6 Date: 06/24/2013 Location(s): North Dakota Offices(s): Golden Field Office

452

CX-010797: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Serration Behavior of High Entropy Alloys CX(s) Applied: A9 Date: 08/14/2013 Location(s): Illinois Offices(s): National Energy Technology Laboratory

453

CX-007418: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Sidewalks to School CX(s) Applied: B1.13 Date: 12/13/2011 Location(s): South Carolina Offices(s): Golden Field Office

454

LOCATION: Johnson County Sheriff's Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformationPostdocs &JeffIntensitySurfaceLOCATION: Johnson County

455

Ombuds Office Location & Hours  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOil inventories inOmbuds Office Location

456

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

. Eden Oregon Joan M. Dukes Oregon August 27, 2009 MEMORANDUM TO: Fish and Wildlife Committee FROM: Nancy Leonard, Fish, Wildlife and Ecosystem Monitoring and Evaluation Manager SUBJECT: Final Draft of Council Fish and Wildlife Program's Management Questions for Indicators In response to public comments received

457

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

one of uncertainty and volatility. The price of crude oil was $25 a barrel in January of 2000. In July. Eden Oregon Joan M. Dukes Oregon DRAFT FUEL PRICES FOR THE SIXTH POWER PLAN NOVEMBER 26, 2008 #12;Draft Fuel Prices for Sixth Power Plan INTRODUCTION Since the millennium, the trend for fuel prices has been

458

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

. Eden Oregon Joan M. Dukes Oregon September 30, 2010 MEMORANDUM TO: Fish and Wildlife Committee members on Project #2008-800-00, Montana Resident Fish Habitat Acquisition1 , Columbia Basin Fish Accord project. No action is requested of the Fish and Wildlife Committee regarding this Accord project. Currently

459

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

. Eden Oregon Joan M. Dukes Oregon September 24, 2009 MEMORANDUM TO: Fish and Wildlife Committee FROM: Nancy Leonard, Fish, Wildlife and Ecosystem Monitoring and Evaluation Manager SUBJECT: Discussion on proposed Fish and Wildlife Program Indicators Briefly describe the process used to derive the recommended

460

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

's Sixth Power Plan. The forecast will be revisited as refined assessments of demand, generating resource. Eden Oregon Joan M. Dukes Oregon INTERIM WHOLESALE POWER PRICE FORECAST MARCH 6, 2008 Council Document 2008-05 #12;Interim Wholesale Power Price Forecast This report describes an interim revision

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

AND DISCOUNT RATE FOR THE SIXTH POWER PLAN When Albert Einstein died, he met three people in the queue outside. Eden Oregon Joan M. Dukes Oregon April 3, 2008 MEMORANDUM TO: Power Committee FROM: Wally Gibson SUBJECT: Paper on Financial Assumptions for the Sixth Power Plan There will be a presentation

462

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

-Chair Oregon Bruce A. Measure Montana James A. Yost Idaho W. Bill Booth Idaho Henry Lorenzen Oregon Tom Karier and Liaison Specialist Subject: Independent Scientific Advisory Board (ISAB) Review of the Fish and Wildlife scientific merits in time to inform amendments to the Fish and Wildlife Program and before the Council

463

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

Idaho Supplementation Study o Hatchery Scientific Review Group results o Council criteria from the RM-Chair Oregon Rhonda Whiting Montana W. Bill Booth Idaho James A. Yost Idaho Bill Bradbury Oregon Tom Karier best to integrate their technical and scientific findings with management policies and decision

464

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

-Chair Oregon Bruce A. Measure Montana James A. Yost Idaho W. Bill Booth Idaho Henry Lorenzen Oregon Tom Karier Report Over the past several months the RTF has been busy reviewing measure updates, preparing a business case for end use load data research, consolidating and updating its guidelines for estimating savings

465

Conceptual Model of the Klamath Falls, Oregon Geothermal Area  

SciTech Connect (OSTI)

Over the last 50 years significant amounts of data have been obtained from the Klamath Falls geothermal resource. To date, the complexity of the system has stymied researchers, leading to the development of only very generalized hydrogeologic and geothermal models of the area. Recently, the large quantity of available temperature data have been re-evaluated, revealing new information on subsurface heat flow and locations of faults in the system. These inferences are supported by borehole, geochemical, geophysical, and hydrologic data. Based on re-evaluation of all available data, a detailed conceptual model for the Klamath Falls geothermal resource is proposed. 1 tab., 8 figs., 21 refs.

Prucha, R.H.; Benson, S.M.; Witherspoon, P.A.

1987-01-20T23:59:59.000Z

466

Conceptual model of the Klamath Falls, Oregon geothermal area  

SciTech Connect (OSTI)

Over the last 50 years significant amounts of data have been obtained from the Klamath Falls geothermal resource. To date, the complexity of the system has stymied researchers, leading to the development of only very generalized hydrogeologic and geothermal models of the area. Recently, the large quantity of available temperature data have been re-evaluated, revealing new information on subsurface heat flow and locations of faults in the system. These inferences are supported by borehole, geochemical, geophysical, and hydrologic data. Based on re-evaluation of all available data, a detailed conceptual model for the Klamath Falls geothermal resource is proposed.

Prucha, R.H.; Benson, S.M.; Witherspoon, P.A.

1987-01-01T23:59:59.000Z

467

Application of a Hydrodynamic Model for Assessing the Hydraulic Capacity and Flow Field at Willamette Falls Dam, Oregon  

SciTech Connect (OSTI)

The Willamette Falls Hydroelectric Power Dam, operated by Portland General Electric (PGE), is located on the Willamette River, Oregon. The Project site consists of T.W. Sullivan Power Plant and a 2,950-ft-long spillway located on the top of the Willamette Falls Dam. As part of the effort of protection and enhancement of environmental resources, a flow control structure at the dam was proposed to improve the flow field and enhance the downstream juvenile fish passage in the region just upstream of the forebay (pre-forebay). The flow in the pre-forebay of Willamette Falls Dam is affected by the complex geometry and bathymetry, powerhouse flow, fish ladder flow and the spillway around the dam. The expectation was that the flow would be sensitive to the proposed flow control structures and could be modified to enhance downstream migration. In this study, a three-dimensional, free-surface hydrodynamic model (EFDC) was developed for the pre-forebay region of Willamette Falls to evaluate the feasibility of the proposed alternative and its effect on the flow field in two different flow regimes (low and high river flow), as well as to assess the hydraulic capacity of flow control structures. One of the key challenges in this modeling study was to properly specify the free open boundary conditions along the 2,950-feet-long spillway. In this study, a pressure boundary condition based on hydraulic head rating curves was applied to the free spillway boundary. The numerical model was calibrated with ADP velocity measurements at 17 stations for the existing low flow condition. Good agreements between model results and measured data were obtained, indicating the successful application of pressure boundary condition on the free spillway boundary. The calibrated model was applied to simulate the flow field and free surface elevation in the high flow region near the control flow structures under different alternative conditions. The model results were used to evaluate the effectiveness of flow control structure alternative for downstream fish passage. The model was also used to estimate the hydraulic capacity based on the water surface head drops upstream of the structures. This model application demonstrated that a free surface coastal model can be used successfully to examine free surface hydraulic problems near high velocity regions upstream of spillways at dams.

Lee, Cheegwan; Yang, Zhaoqing; Khangaonkar, Tarang P.; Divers, Arya-Behbehani

2006-08-03T23:59:59.000Z

468

EIS-0492: Oregon LNG Export Project (Warrenton, OR) and Washington Expansion Project (between Sumas and Woodland, WA)  

Broader source: Energy.gov [DOE]

The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a cooperating agency, an EIS to analyze the potential environmental impacts of proposals (1) to add liquefaction and export capability to a proposed liquefied natural gas (LNG) import terminal in Warrenton, Oregon, and add 39 miles of new pipeline in Columbia County, Oregon, and Cowlitz County, Washington, to interconnect with the Northwest Pipeline, and (2) to expand the capacity of the Northwest Pipeline by adding 140 miles of 36-inch diameter pipeline in 10 segments and increasing compression at five existing compressor stations. These proposals are connected actions and will be evaluated in the same EIS.

469

Automated Fault Location In Smart Distribution Systems  

E-Print Network [OSTI]

of utilizing a suitable fault location method. As distribution systems are gradually evolving into smart distribution systems, application of more accurate fault location methods based on gathered data from various Intelligent Electronic Devices (IEDs...

Lotfifard, Saeed

2012-10-19T23:59:59.000Z

470

EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

471

Union County - La Grande, Oregon geothermal district heating: feasibility assessment. Final report  

SciTech Connect (OSTI)

This report presents an assessment of geothermal district heating in the City of La Grande, Oregon. Eight study area districts were analyzed to determine their economic feasibility. Results from the analyses conclude that certain districts within the City of La Grande are economically feasible if certain assumptions are correct. Development of geothermal district heating for these areas would provide direct energy and dollar savings to the building owners and would also provide direct and indirect benefits to low and moderate income households within the City.

Jenkins, H. II; Giddings, M.; Hanson, P.

1982-09-01T23:59:59.000Z

472

Analysis of the AirTouch automatic vehicle location system's ability to locate moving vehicles  

E-Print Network [OSTI]

Automatic vehicle location systems are becoming more prevalent in diverse transportation applications. Their ability to locate vehicles can assist in locating emergency and public transit vehicles for better real-time dispatching as well...

Henry, Tracy Lynn

1995-01-01T23:59:59.000Z

473

A nested grid model of the Oregon Coastal Transition Zone: Simulations and comparisons with observations during the 2001  

E-Print Network [OSTI]

A nested grid model of the Oregon Coastal Transition Zone: Simulations and comparisons several hundred kilometers offshore where shelf flows interact with the northern California Current is realistic representation of coastal jet separation and eddy formation offshore of Cape Blanco. Three

Kurapov, Alexander

474

Developing an Online Tool for Delivering Research Results: An Update to the Oregon Department of Transportation's Crash Reduction Factor Database  

E-Print Network [OSTI]

Developing an Online Tool for Delivering Research Results: An Update to the Oregon Department interactive online report (tool) can produce results that are easier for the user to access of Transportation's crash reduction factor (CRF) database were incorporated into an online tool. The paper describes

Bertini, Robert L.

475

Student Health Advisory Board Meeting, April 15, 2013. Passed June 3, 2013. Oregon State University Student Health Services  

E-Print Network [OSTI]

information about intent and options to raise level of care. Jaya will ask Jeff Luck in Public HealthMinutes Student Health Advisory Board Meeting, April 15, 2013. Passed June 3, 2013. Oregon State University Student Health Services I. Call to Order. A meeting of the OSU Student Health Services Student

Tullos, Desiree

476

EIS-0005-S2: Bonneville Power Administration Proposed FY 1979 Program Facility Planning Supplement Southwest Oregon Area Service, Supplemental  

Broader source: Energy.gov [DOE]

This statement, one of a series prepared by the U.S. Department of Energy’s Bonneville Power Administration on various facets of its construction and maintenance activities, addresses the potential impact of a major new facility proposed for fiscal year 1979. To allow power generated in Wyoming to be delivered to Southwest Oregon and to facilitate the exchange of electric power between the Pacific Northwest and the Middle Snake region, two basic plans of service, each with two corridor routing options, have been identified to meet system requirements. BPA proposes construction of the following two transmission facilities: (1) a 500-kV line from Idaho Power Company's Brownlee Substation in Idaho to BPA's Slatt Substation near Arlington, Oregon, and (2) a 500-kV line from Buckley (near Maupin, Oregon) to Malin, Oregon. This statement must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report (The ""Role EIS""), particularly Appendix B - BPA Power Transmission.

477

Internship Opportunities with Oregon's Congressional Delegation To apply: submit resume, writing sample, cover letter and three references  

E-Print Network [OSTI]

Internship Opportunities with Oregon's Congressional Delegation To apply: submit resume, writing://merkley.senate.gov/services/internships/ To apply: submit cover letter, resume, writing sample (://wyden.senate.gov/constituents/internship.cfm To apply: submit cover letter, resume and application (available online) David Wu (OR-1) Application

Escher, Christine

478

Close-in blasting at the TRI-MET light rail tunnels in Portland, Oregon  

SciTech Connect (OSTI)

Frontier/Traylor Joint Venture is presently constructing a section of the Tri-County Metropolitan Transit District of Oregon`s (TRI-MET) Westside Light Rail System. This new section will extend Portland`s existing transit system to the western suburbs of Beaverton and Hillsboro. The drill-blast excavations at this project include 10,000 feet of 20 foot tunnel, 18 cross passages, three shafts, an underground railway station, and a U-wall open cut. From a blast designer`s perspective, this job has been extremely challenging. Blast vibration is limited to 0.5 ips at 200 feet or at the nearest structure, and airblast is limited to 129 dB--linear peak and 96 dB--C scale. The tunnels pass under heavily built up areas and have top of tunnel to surface cover distances as low as 70 feet. Surface blasting in the 26,000 cubic yard U-wall excavation was limited to five short nighttime periods due to its proximity to the very busy highway 26. This paper describes the techniques that were used to develop safe blasting designs for the TRI-MET Surface blasts and tunnel rounds. It also discusses the measures that were necessary to mitigate noise, vibration, and flyrock.

Revey, G.F.; Painter, D.Z.

1995-12-31T23:59:59.000Z

479

Airborne gamma-ray spectrometer and magnetometer survey, Medford Quadrangle Oregon. Final report  

SciTech Connect (OSTI)

An airborne high sensitivity gamma-ray spectrometer and magnetometer survey was conducted over ten (10) areas over northern California and southwestern Oregon. These include the 2/sup 0/ x 1/sup 0/ NTMS quadrangles of Roseburg, Medford, Weed, Alturas, Redding, Susanville, Ukiah, and Chico along with the 1/sup 0/ x 2/sup 0/ areas of the Coos Bay quadrangle and the Crescent City/Eureka areas combined. This report discusses the results obtained over the Medford, Oregon, map area. Traverse lines were flown in an east-west direction at a line spacing of three miles. Tie lines were flown north-south approximately twelve miles apart. A total of 16,880.5 line miles of geophysical data were acquired, compiled, and interpreted during the survey, of which 2925 line miles are in this quadrangle. The purpose of this study is to acquire and compile geologic and other information with which to assess the magnitude and distribution of uranium resources and to determine areas favorable for the occurrence of uranium in the United States.

Not Available

1981-04-01T23:59:59.000Z

480

Airborne gamma-ray spectrometer and magnetometer survey, Roseburg Quadrangle, Oregon. Final report  

SciTech Connect (OSTI)

An airborne high sensitivity gamma-ray spectrometer and magnetometer survey was conducted over ten (10) areas over northern California and southwestern Oregon. These include the 2/sup 0/ x 1/sup 0/ NTMS quadrangles of Roseburg, Medford, Weed, Alturas, Redding, Susanville, Ukiah, and Chico along with the 1/sup 0/ x 2/sup 0/ areas of the Coos Bay quadrangle and the Crescent City/Eureka areas combined. This report discusses the results obtained over the Roseburg, Oregon, map area. Traverse lines were flown in an east-west direction at a line spacing of six (6) miles. Tie lines were flown north-south approximately eighteen (18) miles apart. A total of 16,880.5 line miles of geophysical data were acquired, compiled, and interpreted during the survey, of which 1596 line miles are in this quadrangle. The purpose of this study is to acquire and compile geologic and other information with which to assess the magnitude and distribution of uranium resources and to determine areas favorable for the occurrence of uranium in the United States.

Not Available

1981-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "locations oregon officess" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Helicopter magnetic survey conducted to locate wells  

SciTech Connect (OSTI)

A helicopter magnetic survey was conducted in August 2007 over 15.6 sq mi at the Naval Petroleum Reserve No. 3’s (NPR-3) Teapot Dome Field near Casper, Wyoming. The survey’s purpose was to accurately locate wells drilled there during more than 90 years of continuous oilfield operation. The survey was conducted at low altitude and with closely spaced flight lines to improve the detection of wells with weak magnetic response and to increase the resolution of closely spaced wells. The survey was in preparation for a planned CO2 flood for EOR, which requires a complete well inventory with accurate locations for all existing wells. The magnetic survey was intended to locate wells missing from the well database and to provide accurate locations for all wells. The ability of the helicopter magnetic survey to accurately locate wells was accomplished by comparing airborne well picks with well locations from an intense ground search of a small test area.

Veloski, G.A.; Hammack, R.W.; Stamp, V. (Rocky Mountain Oilfield Testing Center); Hall, R. (Rocky Mountain Oilfield Testing Center); Colina, K. (Rocky Mountain Oilfield Testing Center)

2008-07-01T23:59:59.000Z

482

Community Detection from Location-Tagged Networks  

E-Print Network [OSTI]

Many real world systems or web services can be represented as a network such as social networks and transportation networks. In the past decade, many algorithms have been developed to detect the communities in a network using connections between nodes. However in many real world networks, the locations of nodes have great influence on the community structure. For example, in a social network, more connections are established between geographically proximate users. The impact of locations on community has not been fully investigated by the research literature. In this paper, we propose a community detection method which takes locations of nodes into consideration. The goal is to detect communities with both geographic proximity and network closeness. We analyze the distribution of the distances between connected and unconnected nodes to measure the influence of location on the network structure on two real location-tagged social networks. We propose a method to determine if a location-based community detection...

Liu, Zhi

2015-01-01T23:59:59.000Z

483

Location theory and the location of industry along an interstate highway  

E-Print Network [OSTI]

to determine the significance of these locational factors among plants with different characteristics that have located in certain localities should provide pertinent information with both practical and theoretical implications. Since 1956, approximately 64... Summary of Plant Location Theory Cost Fac'tots . . . . . . . . . . . . . ~ The Importance of 'the Demand Factor Greenhut's General Theory of Plant Location and the Intangible Factor Location Factors as Revealed by Empirical Study Greenhut's Case...

Miller, James Patterson

1965-01-01T23:59:59.000Z

484

Regenerator Location Problem in Flexible Optical Networks  

E-Print Network [OSTI]

Nov 22, 2014 ... Abstract: In this study we introduce the regenerator location problem in flexible optical networks (RLP-FON). With a given traffic demand, ...

BARIS YILDIZ

2014-11-22T23:59:59.000Z

485

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

. At the January Council meeting Gary James (Confederated Tribes of the Umatilla Indian Reservation) and Kevin Blakely (Oregon Department of Fish and Wildlife) will discuss how the managers plan to address the fall

486

Depths and temperatures of <10.5?Ma mantle melting and the lithosphere-asthenosphere boundary below southern Oregon and northern California  

E-Print Network [OSTI]

Plagioclase and spinel lherzolite thermometry and barometry are applied to an extensive geochemical dataset of young (<10.5?Ma) primitive basaltic lavas from across Oregon's High Lava Plains, California's Modoc Plateau, ...

Till, Christy B.

487

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

a consensus on clear guidelines for determining cost effectiveness of demand response measures and some Oregon Bruce A. Measure Montana Rhonda Whiting Montana April 30, 2008 MEMORANDUM TO: Power Committee FROM

488

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network [OSTI]

Director 800-452-5161 www.nwcouncil.org Fax: 503-820-2370 Bill Bradbury Chair Oregon Bruce A. Measure Vice and the guidelines they must adhere to, membership selection, purpose and role, and current status. Attachments

489

Locating and tracking assets using RFID  

E-Print Network [OSTI]

. In this research, we will focus on how to ?nd the location of an item by using RFID in real time indoors to track equipment. When an item needs to be located, the purpose of using RFID is to minimize the searching time, e?ort, and investment cost. Thus...

Kim, Gak Gyu

2009-05-15T23:59:59.000Z

490

RECYCLING PROGRAM TYPE LOCATION ALLOWED NOT ALLOWED  

E-Print Network [OSTI]

RECYCLING PROGRAM TYPE LOCATION ALLOWED NOT ALLOWED Batteries, toner, ink cartridges & cell phones and recycling is an important part of that effort. Below is a guide to on-campus recycling at RSMAS: Visit http://www.rsmas.miami.edu/msgso/ for map of recycling bin locations. NOTE: This is not an exhaustive list. If unauthorized items are found

Miami, University of

491

Location Privacy and the Personal Distributed Environment  

E-Print Network [OSTI]

Location Privacy and the Personal Distributed Environment Robert C Atkinson, Swee Keow Goo, James-- The Personal Distributed Environment is a new concept being developed within the Mobile VCE Core 3 research, wherever their location: ubiquitous access. Devices are co-ordinated by Device Management Entities (DMEs

Atkinson, Robert C

492

Geothermal : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.  

SciTech Connect (OSTI)

The actual geothermal exploration and development may appear to be a simple and straightforward process in comparison to the legal and institutional maze which the developer must navigate in order to obtain all of the federal, state, and local leases, permits, licenses, and approvals necessary at each step in the process. Finally, and often most difficult, is obtaining a contract for the sale of thermal energy, brine, steam, or electricity. This guide is designed to help developers interested in developing geothermal resource sites in the Bonneville Power Administration Service Territory in the state of Idaho, Montana, Oregon, and Washington better understand the federal, state, and local institutional process, the roles and responsibilities of each agency, and how and when to make contact in order to obtain the necessary documents.

Bloomquist, R.Gordon

1991-10-01T23:59:59.000Z

493

Feasibility study: utilization of landfill gas for a vehicle fuel system, Rossman's landfill, Clackamas County, Oregon  

SciTech Connect (OSTI)

In 1978, a landfill operator in Oregon became interested in the technical and economic feasibility of recovering the methane generated in the landfill for the refueling of vehicles. DOE awarded a grant for a site-specific feasibility study of this concept. This study investigated the expected methane yield and the development of a conceptual gas-gathering system; gas processing, compressing, and storage systems; and methane-fueled vehicle systems. Cost estimates were made for each area of study. The results of the study are presented. Reasoning that gasoline prices will continue to rise and that approximately 18,000 vehicles in the US have been converted to operate on methane, a project is proposed to use this landfill as a demonstration site to produce and process methane and to fuel a fleet (50 to 400) vehicles with the gas produced in order to obtain performance and economic data on the systems used from gas collection through vehicle operation. (LCL)

None

1981-01-01T23:59:59.000Z

494

Evaluation of Fish Passage Conditions for Juvenile Salmonids Using Sensor Fish at Detroit Dam, Oregon  

SciTech Connect (OSTI)

Fish passage conditions through two spillways at Detroit Dam on the North Santiam River in Oregon were evaluated by Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE), Portland District, using Sensor Fish devices. The objective of the study was to describe and compare passage exposure conditions through Spillbay 3 and Spillbay 6 at 1.5- and 3.5-ft gate openings, identifying potential fish injury regions of the routes. The study was performed in July 2009, concurrent with HI-Z balloon-tag studies by Normandeau Associates, Inc. Sensor Fish and live fish were deployed at elevations approximately 3 ft above structure at depths determined using a computational fluid dynamics model. Data collected were analyzed to estimate 1) exposure conditions, particularly exposure to severe collision and shear events by passage route sub-regions; 2) differences in passage conditions between passage routes; and 3) relationships to live-fish injury and mortality data estimates.

Duncan, Joanne P.

2010-01-29T23:59:59.000Z

495

EA-1941: Boyer-Tillamook Access Road Improvement Project, Tillamook and Yamhill Counties, Oregon  

Broader source: Energy.gov [DOE]

BPA prepared an EA, FONSI, and Mitigation Action Plan to assess the potential environmental impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission Line in Tillamook and Yamhill counties, Oregon. Associated activities would include resurfacing roads, adding drainage, widening 3 miles of road, constructing 0.1 mile of new road, maintaining culverts, and constructing outlet ditches and retaining walls. In addition, new bridges would be built, and culverts that currently block fish passage for anadromous and resident fish would be replaced. Additional information is available at the project website: http://efw.bpa.gov/environmental_services/Document_Library/Boyer-Tillamook/.

496

SFSU Building Coordinators List College or Administrative Unit Location(s)  

E-Print Network [OSTI]

SFSU Building Coordinators List College or Administrative Unit Location(s) Building Coordinator81193 cathym@sfsu.edu GYM 102B Student Services Building SSB Mirel Tikkanen x53566 mtikkane@sfsu.edu SSB

497

Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.  

SciTech Connect (OSTI)

BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

498

Method of locating underground mines fires  

DOE Patents [OSTI]

An improved method of locating an underground mine fire by comparing the pattern of measured combustion product arrival times at detector locations with a real time computer-generated array of simulated patterns. A number of electronic fire detection devices are linked thru telemetry to a control station on the surface. The mine's ventilation is modeled on a digital computer using network analysis software. The time reguired to locate a fire consists of the time required to model the mines' ventilation, generate the arrival time array, scan the array, and to match measured arrival time patterns to the simulated patterns.

Laage, Linneas (Eagam, MN); Pomroy, William (St. Paul, MN)

1992-01-01T23:59:59.000Z

499

The Value of Flexibility in Robust Location-Transportation Problem  

E-Print Network [OSTI]

production and distribution of products can be delayed until actual orders are ... such as hub locations, supplier locations, air freight hub locations, railway station

2014-11-24T23:59:59.000Z

500

Addressing endogeneity in residential location models  

E-Print Network [OSTI]

Some empirical residential location choice models have reported dwelling-unit price estimated parameters that are small, not statistically significant, or even positive. This would imply that households are non-sensitive ...

Guevara-Cue, Cristián Angelo

2005-01-01T23:59:59.000Z