National Library of Energy BETA

Sample records for location operating status

  1. Field Operations Program Activities Status Report

    SciTech Connect (OSTI)

    J. E. Francfort; D. V. O'Hara; L. A. Slezak

    1999-05-01

    The Field Operations Program is an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed by the Idaho National Engineering and Environmental Laboratory. The Program's goals are to evaluate electric vehicles in real-world applications and environments, support electric vehicle technology advancement, develop infrastructure elements necessary to support significant electric vehicle use, support increased use of electric vehicles in federal fleets, and increase overall awareness and acceptance of electric vehicles. This report covers Program activities from fiscal year 1997 through mid-fiscal year 1999. The Field Operations Program succeeded the Site Operator Program, which ended in September 1996. Electric vehicle testing conducted by the Program includes baseline performance testing (EV America testing), accelerated reliability (life-cycle) testing, and fleet testing. The baseline performance parameters include accelerations, braking, range, energy efficiency, and charging time. The Program collects accelerated reliability and fleet operations data on electric vehicles operated by the Program's Qualified Vehicle Testing (QVT) partners. The Program's QVT partners have over 3 million miles of electric vehicle operating experience.

  2. Multi-canister overpack closure operations location study

    SciTech Connect (OSTI)

    Goldmann, L.H.

    1996-04-15

    The Spent Nuclear Fuel Path Forward Project (SNF Project) has been established to develop engineered methods for the expedited removal of the irradiated uranium fuel from the K East (KE) and K West (KW) Basins. As specified by the SNF Project, the SNF will be removed from the K Basins, conditioned for dry storage and placed in a long term interim storage facility located in the 200 East Area. The SNF primarily consists of Zircaloy-2 clad uranium fuel discharged from the N-Reactor. A small portion of the SNF is Single Pass Reactor (SPR) Fuel, which is aluminum clad uranium fuel. The SNF will be loaded into Multi-Canister Overpacks (MCOs) at the K Basins, transferred to the Cold Vacuum Drying (CVD) facility for initial fuel conditioning, and transported to the Canister Storage Building (CSB) for staging, final fuel conditioning, and dry storage. The MCO is a transportation, conditioning, and storage vessel. The MCO consists of a 24 inch pipe with a welded bottom closure and a top closure that is field welded after the MCO is loaded with SNF. The MCO is handled and transported in the vertical orientation during all operations. Except for operations within the CSB, the MCO is always within the transportation cask which primarily provides radiological shielding and structural protection of the MCO. The MCO closure operations location study provides a relative evaluation of location options at the K Basins and the CVD Facility and recommends that the MCO closure weld be performed, inspected, and repaired at the CVD Facility.

  3. Microsoft PowerPoint - 5.3 Item 01 Top Kill Operation Status...

    Energy Savers [EERE]

    5.3 Item 01 Top Kill Operation Status 09 June 1400.pptx Microsoft PowerPoint - 5.3 Item 01 Top Kill Operation Status 09 June 1400.pptx Microsoft PowerPoint - 5.3 Item 01 Top Kill...

  4. Operational status of the Brookhaven National Laboratory Accelerator Test Facility

    SciTech Connect (OSTI)

    Batchelor, K.; Ben-Zvi, I.; Fernow, R.C.; Fischer, A.S.; Gallardo, J.; Jialin, Xie; Kirk, H.G.; Malone, R.G.; Parsa, Z.; Palmer, R.B.; Rao, T.; Rogers, J.; Sheehan, J.; Tsang, T.Y.F.; Ulc, S.; van Steenbergen, A.; Woodle, M.; Zhang, R.S. (Brookhaven National Lab., Upton, NY (USA)); Bigio, I.; Kurnit, N.; Shimada, T. (Los Alamos National Lab., NM (USA)); McDonald, K.T.; Russel, D.P. (Princeton Univ., NJ (USA)); Jiang,

    1990-01-01

    Initial design parameters and early operational results of a 50 MeV high brightness electron linear accelerator are described. The system utilizes a radio frequency electron gun operating at a frequency of 2.856 GHz and a nominal output energy of 4.5 MeV followed by two, 2{pi}/3 mode, disc loaded, traveling wave accelerating sections. The gun cathode is photo excited with short (6 psec) laser pulses giving design peak currents of a few hundred amperes. The system will be utilized to carry out infra-red FEL studies and investigation of new high gradient accelerating structures.

  5. Field Laboratory in the Osage Reservation -- Determination of the Status of Oil and Gas Operations: Task 1. Development of Survey Procedures and Protocols

    SciTech Connect (OSTI)

    Carroll, Herbert B.; Johnson, William I.

    1999-04-27

    Procedures and protocols were developed for the determination of the status of oil, gas, and other mineral operations on the Osage Mineral Reservation Estate. The strategy for surveying Osage County, Oklahoma, was developed and then tested in the field. Two Osage Tribal Council members and two Native American college students (who are members of the Osage Tribe) were trained in the field as a test of the procedures and protocols developed in Task 1. Active and inactive surface mining operations, industrial sites, and hydrocarbon-producing fields were located on maps of the county, which was divided into four more or less equal areas for future investigation. Field testing of the procedures, protocols, and training was successful. No significant damage was found at petroleum production operations in a relatively new production operation and in a mature waterflood operation.

  6. Licensed operating reactors. Status summary report data as of December 31, 1993

    SciTech Connect (OSTI)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  7. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    SciTech Connect (OSTI)

    1995-04-01

    The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  8. Operation and development status of the J-PARC ion source

    SciTech Connect (OSTI)

    Yamazaki, S. Ikegami, K.; Ohkoshi, K.; Ueno, A.; Koizumi, I.; Takagi, A.; Oguri, H.

    2014-02-15

    A cesium-free H{sup ?} ion source driven with a LaB{sub 6} filament is being operated at the Japan Proton Accelerator Research Complex (J-PARC) without any serious trouble since the restoration from the March 2011 earthquake. The H{sup ?} ion current from the ion source is routinely restricted approximately 19 mA for the lifetime of the filament. In order to increase the beam power at the linac beam operation (January to February 2013), the beam current from the ion source was increased to 22 mA. At this operation, the lifetime of the filament was estimated by the reduction in the filament current. According to the steep reduction in the filament current, the break of the filament was predicted. Although the filament has broken after approximately 10 h from the steep current reduction, the beam operation was restarted approximately 8 h later by the preparation for the exchange of new filament. At the study time for the 3 GeV rapid cycling synchrotron (April 2013), the ion source was operated at approximately 30 mA for 8 days. As a part of the beam current upgrade plan for the J-PARC, the front end test stand consisting of the ion source and the radio frequency quadrupole is under preparation. The RF-driven H{sup ?} ion source developed for the J-PARC 2nd stage requirements will be tested at this test stand.

  9. Operational Status and Power Upgrade Prospects of the Neutrino Experimental Facility at J-PARC

    E-Print Network [OSTI]

    Taku Ishida; for the T2K Beam Group

    2015-03-08

    In order to explore CP asymmetry in the lepton sector, a power upgrade to the neutrino experimental facility at J-PARC is a key requirement for both the Tokai to Kamioka (T2K) long-baseline neutrino oscillation experiment and a future project with Hyper-Kamiokande. Based on five years of operational experience, the facility has achieved stable operation with 230 kW beam power without significant problems on the beam-line apparatus. After successful maintenance works in 2013-2014 to replace all electromagnetic horns and a production target, the facility is now ready to accomodate a 750-kW-rated beam. Also, the possibility of achieving a few to multi-MW beam operation is discussed in detail.

  10. Waste Area Group 10, Operable Unit 10-08, Annual Monitoring Status Report for Fiscal Year 2009

    SciTech Connect (OSTI)

    Howard Forsythe

    2010-02-04

    This report documents the status of Fiscal Year 2009 groundwater monitoring performed in Waste Area Group 10 at the U.S. Department of Energy Idaho National Laboratory Site, as identified in the Groundwater Monitoring and Field Sampling Plan for Operable Unit 10-08. Twelve of the fourteen required wells were sampled, and all ten required intervals from the Westbay wells were sampled. Two wells were not sampled because they were in the process of being converted into multiple-sample-interval Westbay wells by the U.S. Geological Survey. Groundwater samples were analyzed for volatile organic compounds identified on the Contract Laboratory Program target analyte list as well as metals (filtered), anions, and radionuclides (i.e., I-129, tritium, Tc-99, gross alpha, gross beta, and Sr-90). No contaminant exceeded maximum contaminant levels in wells along the southern boundary of the Idaho National Laboratory Site or in guard wells. Iron was above its secondary maximum contaminant level of 300 ug/L in one well. The cause of the elevated iron concentration is uncertain. Lead was detected just below its action level. However, the zinc concentration was also elevated in these wells, and the source of the lead is probably galvanized riser pipe in the wells. Once the galvanized pipe is replaced, both lead and zinc concentrations should decline, as has been observed at other Waste Area Group 10 wells.

  11. Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006

    SciTech Connect (OSTI)

    R. P. Wells

    2007-05-09

    This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

  12. Library Locations Locations other than Main Library

    E-Print Network [OSTI]

    Library Locations Locations other than Main Library Example: Feminist Studies HQ1410 .U54 2009 ............................................................2 Central Call Number Main Library Location Main Library Example: Main Library HQ1410 .U54 2009 See Center (ATC) Classroom 1575 Building Operations Main Entrance Map and Imagery Laboratory (MIL

  13. Live Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Users Live Status Queue Look Classic Queue Look Scheduled Outages Outage Log Science Gateway Status Login Node Status Filesystem Status My NERSC Move to CRT Getting Started...

  14. Status of ArDM-1t: First observations from operation with a full ton-scale liquid argon target

    E-Print Network [OSTI]

    ArDM Collaboration; J. Calvo; C. Cantini; M. Daniel; U. Degunda; S. Di Luise; L. Epprecht; A. Gendotti; S. Horikawa; L. Knecht; B. Montes; W. Mu; M. Munoz; S. Murphy; G. Natterer; K. Nguyen; K. Nikolics; L. Periale; C. Regenfus; L. Romero; A. Rubbia; R. Santorelli; F. Sergiampietri; D. Sgalaberna; T. Viant; S. Wu

    2015-05-10

    ArDM-1t is the first operating ton-scale liquid argon detector for direct search of Dark Matter particles. Developed at CERN as Recognized Experiment RE18, the experiment has been approved in 2010 to be installed in the Spanish underground site LSC (Laboratorio Subterraneo de Canfranc). Under the label of LSC EXP-08-2010 the ArDM detector underwent an intensive period of technical completion and safety approval until the recent filling of the target vessel with almost 2 ton of liquid argon. This report describes the experimental achievements during commissioning of ArDM and the transition into a stage of first physics data taking in single phase operational mode. We present preliminary observations from this run. A first indication for the background discrimination power of LAr detectors at the ton-scale is shown. We present an outlook for completing the detector with the electric drift field and upgrade of the scintillation light readout system with novel detector modules based on SiPMs in order to improve the light yield.

  15. Reversible micromachining locator

    DOE Patents [OSTI]

    Salzer, L.J.; Foreman, L.R.

    1999-08-31

    This invention provides a device which includes a locator, a kinematic mount positioned on a conventional tooling machine, a part carrier disposed on the locator and a retainer ring. The locator has disposed therein a plurality of steel balls, placed in an equidistant position circumferentially around the locator. The kinematic mount includes a plurality of magnets which are in registry with the steel balls on the locator. In operation, a blank part to be machined is placed between a surface of a locator and the retainer ring (fitting within the part carrier). When the locator (with a blank part to be machined) is coupled to the kinematic mount, the part is thus exposed for the desired machining process. Because the locator is removably attachable to the kinematic mount, it can easily be removed from the mount, reversed, and reinserted onto the mount for additional machining. Further, the locator can likewise be removed from the mount and placed onto another tooling machine having a properly aligned kinematic mount. Because of the unique design and use of magnetic forces of the present invention, positioning errors of less than 0.25 micrometer for each machining process can be achieved. 7 figs.

  16. Plant Operational Status - Pantex Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDid youOxygen Generation | Center for GasPhysics Physics PrintPicturePlant

  17. Status of the Milagro $\\gamma$ Ray Observatory

    E-Print Network [OSTI]

    Atkins, R; Berley, D; Chen, M L; Coyne, D G; Delay, R S; Dingus, B L; Dorfan, D E; Ellsworth, R W; Evans, D; Falcone, A D; Fleysher, L; Fleysher, R; Gisler, G; Goodman, J A; Haines, T J; Hoffman, C M; Hugenberger, S; Kelley, L A; Leonor, I; Macri, J R; McConnell, M; McCullough, J F; McEnery, J E; Miller, R S; Mincer, A I; Morales, M F; Némethy, P; Ryan, J M; Schneider, M; Shen, B; Shoup, A L; Sinnis, G; Smith, A J; Sullivan, G W; Thompson, T N; Tümer, T O; Wang, K; Wascko, M O; Westerhoff, S; Williams, D A; Yang, T; Yodh, G B

    2001-01-01

    The Milagro Gamma Ray Observatory is the world's first large-area water Cherenkov detector capable of continuously monitoring the sky at TeV energies. Located in northern New Mexico, Milagro will perform an all sky survey of the Northern Hemisphere at energies between ~250 GeV and 50 TeV. With a high duty cycle, large detector area (~5000 square meters), and a wide field-of-view (~1 sr), Milagro is uniquely capable of searching for transient and DC sources of high-energy gamma-ray emission. Milagro has been operating since February, 1999. The current status of the Milagro Observatory and initial results will be discussed.

  18. Status of the Milagro Gamma Ray Observatory

    E-Print Network [OSTI]

    R. Atkins; W. Benbow; D. Berley; M. -L. Chen; D. G. Coyne; R. S. Delay; B. L. Dingus; D. E. Dorfan; R. W. Ellsworth; D. Evans; A. Falcone; L. Fleysher; R. Fleysher; G. Gisler; J. A. Goodman; T. J. Haines; C. M. Hoffman; S. Hugenberger; L. A. Kelley; I. Leonor; J. Macri; M. McConnell; J. F. McCullough; J. E. McEnery; R. S. Miller; A. I. Mincer; M. F. Morales; P. Nemethy; J. M. Ryan; M. Schneider; B. Shen; A. Shoup; G. Sinnis; A. J. Smith; G. W. Sullivan; T. N. Thompson; O. T. Tumer; K. Wang; M. O. Wascko; S. Westerhoff; D. A. Williams; T. Yang; G. B. Yodh

    1999-06-24

    The Milagro Gamma Ray Observatory is the world's first large-area water Cherenkov detector capable of continuously monitoring the sky at TeV energies. Located in northern New Mexico, Milagro will perform an all sky survey of the Northern Hemisphere at energies between ~250 GeV and 50 TeV. With a high duty cycle, large detector area (~5000 square meters), and a wide field-of-view (~1 sr), Milagro is uniquely capable of searching for transient and DC sources of high-energy gamma-ray emission. Milagro has been operating since February, 1999. The current status of the Milagro Observatory and initial results will be discussed.

  19. Status Perceptions 

    E-Print Network [OSTI]

    Alexander, C Norman Jr

    2015-08-06

    PERCEPTIONS by C. Norman Alexander, Stanford University Technical Report No. ABSTRACT This paper explores the proposition that people perceive the status of objects in a system differently as a function of their own status positions. The neglect of adequate...

  20. Status Perceptions 

    E-Print Network [OSTI]

    Alexander, C Norman Jr

    2015-08-11

    PERCEPTIONS by C. Norman Alexander, Jr. Stanford University Technical Report N043 ? April, 1972 ABSTRACT It is proposed that people perceive differentiy the status of persons or positions in any collectivity as a function of their own status positions... Perceptions on Adolescents' Aspirations," (GS-2095, C. Norman Alexander, Jr., Principal Investigator). Judged N 514 1,531 856 PERCENT OF EXCELLENT-GOOD RATINGS OF "KNOWN" OCCUPATIONS BY STATUS OF JUDGE AND OCCUPATION JUDGED _________ Status of Occupation...

  1. Nuclear power plant status diagnostics using a neural network with dynamic node architecture

    SciTech Connect (OSTI)

    Basu, A.

    1992-12-31

    This thesis is part of an ongoing project at Iowa State University to develop ANN based fault diagnostic systems to detect and classify operational transients at nuclear power plants. The project envisages the deployment of such an advisor at Iowa Electric Light and Power Company`s Duane Arnold Energy Center nuclear power plant located at Palo, IA. This advisor is expected to make status diagnosis in real time, thus providing the operators with more time for corrective measures.

  2. Nuclear power plant status diagnostics using a neural network with dynamic node architecture

    SciTech Connect (OSTI)

    Basu, A.

    1992-01-01

    This thesis is part of an ongoing project at Iowa State University to develop ANN based fault diagnostic systems to detect and classify operational transients at nuclear power plants. The project envisages the deployment of such an advisor at Iowa Electric Light and Power Company's Duane Arnold Energy Center nuclear power plant located at Palo, IA. This advisor is expected to make status diagnosis in real time, thus providing the operators with more time for corrective measures.

  3. Automation Status

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    member August 11, 2011 Automation Status ing NREL Manufacturing R&D Workshop Fuel Cell Proton Exchange Membrane (PEM) and Solid Oxide Fuel Cell (SOFC) Manufacturing Lines and test...

  4. Library Locations Locations other than Main Library

    E-Print Network [OSTI]

    Library Locations Locations other than Main Library Example: Feminist Studies HQ1410 .U54 2009 these from the library catalog: www.library.ucsb.edu/depts/access/howinprocess.html Main: Items located in the Main Library, Davidson Main Serials Reading Area: 2 North Map & Imagery Lab: 1 North Media Collection

  5. Locative Inversion In Cantonese

    E-Print Network [OSTI]

    Mok, Sui-Sang

    1992-01-01

    This paper proposes that locative inversion is a widespread syntactic process in Cantonese. The sentence-initial locative phrases in the Locative Inversion sentences are argued to be subjects which come from the postverbal complement position...

  6. Accommodation Location(s) Cologne -Ehrenfeld.

    E-Print Network [OSTI]

    Molinari, Marc

    Accommodation Location(s) ­ Cologne - Ehrenfeld. Price of rent ­ Sub-let, cost roughly 300 euros a month inc bills. Organisation of accommodation/gas/electricity/internet/phones ­ Because I lived with Telekom for phone/internet as they just try to rip you off! Germany COLOGNE Language Assistantship Travel

  7. Operations Research Analyst

    Broader source: Energy.gov [DOE]

    This position is located in Power Services of the Bonneville Power Administration. The purpose of this position is to serve as a developmental operations research analyst responsible for...

  8. MOBILE DEVICE LOCATION INFORMATION ACQUISITION FRAMEWORK FOR DEVELOPMENT OF LOCATION

    E-Print Network [OSTI]

    Dustdar, Schahram

    MOBILE DEVICE LOCATION INFORMATION ACQUISITION FRAMEWORK FOR DEVELOPMENT OF LOCATION INFORMATION, 1040 Vienna, Austria dustdar@infosys.tuwien.ac.at Keywords: Mobile device location information, location information based services, location information acquisition. Abstract: Mobile device location

  9. Status of Wheeler Reservoir

    SciTech Connect (OSTI)

    Not Available

    1990-09-01

    This is one in a series of status reports prepared by the Tennessee Valley Authority (TVA) for those interested in the conditions of TVA reservoirs. This overview of Wheeler Reservoir summarizes reservoir purposes and operation, reservoir and watershed characteristics, reservoir uses and use impairments, and water quality and aquatic biological conditions. The information presented here is from the most recent reports, publications, and original data available. If no recent data were available, historical data were summarized. If data were completely lacking, environmental professionals with special knowledge of the resource were interviewed. 12 refs., 2 figs.

  10. Optimal fault location 

    E-Print Network [OSTI]

    Knezev, Maja

    2008-10-10

    sequence of events newly obtained recording belongs. Software prototype of the proposed automated fault location analysis is developed using Java programming language. Fault location analysis is automatically triggered by appearance of new event files in a...

  11. NIF Status Update - 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    status NIF Status Update - 2014 May - Highlights of May Experiments on NIF Gigabar Equation-of-State Experiments Production of Beryllium Capsules for NIF Begins First Weekly...

  12. Dynamic resource location in peer-to-peer networks 

    E-Print Network [OSTI]

    Nathuji, Ripal Babubhai

    2004-09-30

    Resource location is a necessary operation for computer applications. In large scale peer-to-peer systems, random search is a scalable approach for locating dynamic resources. Current peer-to-peer systems can be partitioned into those which rely...

  13. An Archaeological Survey of an Alternate Dredge Decant Line and Drop Structure in Northern Calhoun County, Texas for the Alcoa World Alumina LLC, Point Comfort Operations Located in Point Comfort, Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-07-07

    An archaeological survey of the location of the site of a proposed dredge decant line and drop structure in northern Calhoun County, Texas was performed by Brazos Valley Research Associates (BVRA) on April 30, 2003 and May 22, 2003 under United...

  14. Helicopter magnetic survey conducted to locate wells

    SciTech Connect (OSTI)

    Veloski, G.A.; Hammack, R.W.; Stamp, V.; Hall, R.; Colina, K.

    2008-07-01

    A helicopter magnetic survey was conducted in August 2007 over 15.6 sq mi at the Naval Petroleum Reserve No. 3’s (NPR-3) Teapot Dome Field near Casper, Wyoming. The survey’s purpose was to accurately locate wells drilled there during more than 90 years of continuous oilfield operation. The survey was conducted at low altitude and with closely spaced flight lines to improve the detection of wells with weak magnetic response and to increase the resolution of closely spaced wells. The survey was in preparation for a planned CO2 flood for EOR, which requires a complete well inventory with accurate locations for all existing wells. The magnetic survey was intended to locate wells missing from the well database and to provide accurate locations for all wells. The ability of the helicopter magnetic survey to accurately locate wells was accomplished by comparing airborne well picks with well locations from an intense ground search of a small test area.

  15. Wind Turbine Manufacturers in the U. S.: Locations and Local...

    Wind Powering America (EERE)

    Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Wind Turbine Manufacturers in the U.S.: Locations and Local Impacts WINDPOWER 2010 Conference...

  16. High Power Target Design and Operational Considerations

    E-Print Network [OSTI]

    McDonald, Kirk

    of Energy SNS Target Systems and Status Update Target R&D Program Has Addressed Key Design and Operational-Battelle for the U.S. Department of Energy SNS Target Systems and Status Update Mercury target development activities.S. Department of Energy SNS Target Systems and Status Update · Peak energy deposition in Hg for a single pulse

  17. EIS-0426: Site-Wide Environmental Impact Statement for Continued Operation of the Department of Energy / National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada

    Broader source: Energy.gov [DOE]

    This Site-Wide EIS evaluates the potential environmental impacts of proposed alternatives for continued management and operation of the Nevada National Security Site (NNSS) (formerly known as the Nevada Test Site) and other U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA)-managed sites in Nevada.

  18. Location linked information

    E-Print Network [OSTI]

    Mankins, Matthew William David, 1975-

    2003-01-01

    This work builds an infrastructure called Location Linked Information that offers a means to associate digital information with public, physical places. This connection creates a hybrid virtual/physical space, called glean ...

  19. Locating Heat Recovery Opportunities 

    E-Print Network [OSTI]

    Waterland, A. F.

    1981-01-01

    Basic concepts of heat recovery are defined as they apply to the industrial community. Methods for locating, ranking, and developing heat recovery opportunities are presented and explained. The needs for useful heat 'sinks' are emphasized as equal...

  20. Radiological Final Status Survey of the Hammond Depot, Hammond, Indiana

    SciTech Connect (OSTI)

    T.J. Vitkus

    2008-04-07

    ORISE conducted extensive scoping, characterization, and final status surveys of land areas and structures at the DNSC’s Hammond Depot located in Hammond, Indiana in multiple phases during 2005, 2006 and 2007.

  1. hi MARKET SUPPLEMENT STATUS MARKET SUPPLEMENT STATUS for: _____________________________________________

    E-Print Network [OSTI]

    Calgary, University of

    hi MARKET SUPPLEMENT STATUS MARKET SUPPLEMENT STATUS for i:\\appoint\\revision\\market supplement forms\\market supplement status form.rtf Print Form #12;hi

  2. APS Beamline Station Operational Limits Information Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TYPE Current CAA Form or Status Approval Date Duration Max. Current (ma) Min. ID Gap (mm) Comments 01 XOR BM Operational 05-15-98 100 White beam in A and B only ID Operational...

  3. Status of the LBNE Neutrino Beamline

    SciTech Connect (OSTI)

    Papadimitriou, Vaia; /Fermilab

    2011-12-01

    The Long Baseline Neutrino Experiment (LBNE) will utilize a neutrino beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a beam of neutrinos toward a detector placed at the Homestake Mine in South Dakota. The neutrinos are produced in a three-step process. First, protons from the Main Injector (60-120 GeV) hit a solid target and produce mesons. Then, the charged mesons are focused by a set of focusing horns into the decay pipe, towards the far detector. Finally, the mesons that enter the decay pipe decay into neutrinos. The parameters of the facility were determined taking into account several factors including the physics goals, the Monte Carlo modeling of the facility, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be {approx}700 kW, however some of the parameters were chosen to be able to deal with a beam power of 2.3 MW. We discuss here the status of the conceptual design and the associated challenges.

  4. Status of the LBNE Neutrino Beamline

    E-Print Network [OSTI]

    Vaia Papadimitriou

    2011-12-04

    The Long Baseline Neutrino Experiment (LBNE) will utilize a neutrino beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a beam of neutrinos toward a detector placed at the Homestake Mine in South Dakota. The neutrinos are produced in a three-step process. First, protons from the Main Injector (60-120 GeV) hit a solid target and produce mesons. Then, the charged mesons are focused by a set of focusing horns into the decay pipe, towards the far detector. Finally, the mesons that enter the decay pipe decay into neutrinos. The parameters of the facility were determined taking into account several factors including the physics goals, the Monte Carlo modeling of the facility, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be ~700 kW, however some of the parameters were chosen to be able to deal with a beam power of 2.3 MW. We discuss here the status of the conceptual design and the associated challenges.

  5. ARM - Instrument Location Table

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory of rare Kaonforsupernovae2GatheringARMHistory and Status of

  6. Relativistic Positioning Systems: current status

    E-Print Network [OSTI]

    Bartolomé Coll; Joan J. Ferrando; Juan A. Morales-Lladosa

    2009-06-03

    A {\\em relativistic positioning system} consists in a set of four clocks broadcasting their respective proper time by means of light signals. Among them, the more important ones are the {\\em auto-located positioning systems,} in which every clock broadcasts not only its proper time but also the proper times that it receives from the other three. At this level, no reference to any exterior system (the Earth surface, for example) and no synchronization are needed. The current status of the theory of relativistic positioning systems is sketched.

  7. Supervisory Operations Research Analyst

    Broader source: Energy.gov [DOE]

    This position is located in Power Services Short-Term Planning(PGSP), Bonneville Power Administration. Short Term Planning provides hydraulic operations strategies to achieve power and non-power...

  8. Status of household water treatment and safe storage in 45 countries and a case study in Northern India

    E-Print Network [OSTI]

    Jain, Mehul

    2010-01-01

    This thesis examines the present of the status of HWTS technologies across the world, and in one location Lucknow, India. The data for the global status of HWTS was collected by contacting the Water, Sanitation and Hygiene ...

  9. Heuristic status polling

    DOE Patents [OSTI]

    Archer, Charles J. (Rochester, MN); Blocksome, Michael A. (Rochester, MN); Heidelberger, Philip (Cortlandt Manor, NY); Kumar, Sameer (White Plains, NY); Parker, Jeffrey J. (Rochester, MN); Ratterman, Joseph D. (Rochester, MN)

    2011-06-07

    Methods, compute nodes, and computer program products are provided for heuristic status polling of a component in a computing system. Embodiments include receiving, by a polling module from a requesting application, a status request requesting status of a component; determining, by the polling module, whether an activity history for the component satisfies heuristic polling criteria; polling, by the polling module, the component for status if the activity history for the component satisfies the heuristic polling criteria; and not polling, by the polling module, the component for status if the activity history for the component does not satisfy the heuristic criteria.

  10. Electric current locator

    DOE Patents [OSTI]

    King, Paul E. (Corvallis, OR); Woodside, Charles Rigel (Corvallis, OR)

    2012-02-07

    The disclosure herein provides an apparatus for location of a quantity of current vectors in an electrical device, where the current vector has a known direction and a known relative magnitude to an input current supplied to the electrical device. Mathematical constants used in Biot-Savart superposition equations are determined for the electrical device, the orientation of the apparatus, and relative magnitude of the current vector and the input current, and the apparatus utilizes magnetic field sensors oriented to a sensing plane to provide current vector location based on the solution of the Biot-Savart superposition equations. Description of required orientations between the apparatus and the electrical device are disclosed and various methods of determining the mathematical constants are presented.

  11. Final Exam Location and Time

    E-Print Network [OSTI]

    Final Exam Location and Time. Math 162 Fall 2001. Date: Wednesday December 12, 2001. Time: 7:00 pm -9:00 pm. Location: Lambert Fieldhouse ...

  12. Final Exam Location and Time

    E-Print Network [OSTI]

    Final Exam Location and Time. Math 161 Fall 2001. Date: Friday December 14, 2001. Time: 8:00 am -10:00 am. Location: Lambert Fieldhouse ...

  13. Location, location, location: utilizing pipelines and services to more effectively georeference the world's biodiversity data

    E-Print Network [OSTI]

    2009-01-01

    location, location: utilizing pipelines and services to morebut also to create pipelines integrated with humanbecome available [8]. These pipelines can be developed to

  14. PACE Status Update

    E-Print Network [OSTI]

    M., Zimring,

    2011-01-01

    in turn providing assurances to lenders and property owners.nation’s largest mortgage lenders. PACE Status Update Recentregarding PACE cautioning that lenders and taxpayers faced “

  15. H.A.R. 11-265 - Hazardous Management: Interim Status Standard...

    Open Energy Info (EERE)

    Status Standard for Owners and OperatorsLegal Abstract The Hawaii State Department of Health regulates hazardous waste management through this chapter of the administrative rules....

  16. Status of current IPH applications

    SciTech Connect (OSTI)

    Kearney, D. W.

    1981-03-01

    The US Department of Energy has funded a series of field tests since 1977 to gain operational experience in the application of solar energy to industrial process heat requirements. To date, 34 design studies or actual installations have been funded utilizing technologies ranging from flat plates to line-focus concentrators to central receiver industrial systems. The types of solar systems include hot air, hot water, and steam production applied to a broad spectrum of industrial processes. The program elements are identified and put in perspective relative to transport fluid, temperature level, and size of the solar field. The status of these programs ranges from design studies to operational systems. Solar enhanced oil recovery and repowering have been studied. The chronological history of each program is tabulated. (LEW)

  17. Tritium Operation Improvements at the Idaho National Laboratory...

    Office of Environmental Management (EM)

    Tritium Operation Improvements at the INL STAR facility More Documents & Publications Fusion Nuclear Science and Technology Program - Status and Plans for Tritium Research Tritium...

  18. Nuclear proliferation status report. Status report

    SciTech Connect (OSTI)

    NONE

    1992-07-01

    This report contains information concerning the nuclear proliferation status of the following countries: (1) Russia, (2) Ukraine, (3) Belarus, (4) Kazakhstan, (5) Israel, (6) India, (7) Pakistan, (8) South Africa, (9) North Korea, (10) Iraq, (11) Iran, (12) Lybia, (13) Algeria, (14) Syria, (15) Brazil, (16) Argentina, and (17) Taiwan.

  19. Oil shale: Technology status report

    SciTech Connect (OSTI)

    Not Available

    1986-10-01

    This report documents the status of the US Department of Energy's (DOE) Oil Shale Program as of the end of FY 86. The report consists of (1) a status of oil shale development, (2) a description of the DOE Oil Shale Program, (3) an FY 86 oil shale research summary, and (4) a summary of FY 86 accomplishments. Discoveries were made in FY 86 about the physical and chemical properties and behavior of oil shales, process chemistry and kinetics, in situ retorting, advanced processes, and the environmental behavior and fate of wastes. The DOE Oil Shale Program shows an increasing emphasis on eastern US oil shales and in the development of advanced oil shale processing concepts. With the award to Foster Wheeler for the design of oil shale conceptual plants, the first step in the development of a systems analysis capability for the complete oil shale process has been taken. Unocal's Parachute Creek project, the only commercial oil shale plant operating in the United States, is operating at about 4000 bbl/day. The shale oil is upgraded at Parachute Creek for input to a conventional refinery. 67 refs., 21 figs., 3 tabs.

  20. Determining the Location of Packaging Operations at Company X

    E-Print Network [OSTI]

    Hausback, Sara B.

    2009-12-18

    processes and eliminate waste. In adherence to this mentality, this project analyzes a method to reduce Company X’s costs as it relates to its supply chain and packaging practices. Many large retailers in the electronics industry require products to be sold...

  1. Method and apparatus for operating equipment in a remote location

    SciTech Connect (OSTI)

    Cassity, T.G.; Montgomery, W.C.; Baker, G.S.; Wedel, A.W.; Taylor, W.M.

    1989-08-29

    This patent describes an apparatus for manipulating equipment including a well component in a subsea wellhead of a subsea marine well. It comprises: detecting means for detecting the occurrence of a condition with respect to the well component within the subsea wellhead, transmitting means for transmitting a signal to the water surface, means for supporting the detecting means and the transmitting means on the running string with the well component, a running string for lowering the well component, the detecting means and the transmitting means into the subsea marine well. The detecting means upon the detection of the occurrence of a condition with respect to the well component within the subsea wellhead causing the transmitting means to transmit a signal to the water surface that the condition has occurred.

  2. The Cricket indoor location system

    E-Print Network [OSTI]

    Priyantha, Nissanka Bodhi, 1968-

    2005-01-01

    Indoor environments present opportunities for a rich set of location-aware applications such as navigation tools for humans and robots, interactive virtual games, resource discovery, asset tracking, location-aware sensor ...

  3. Search Text Based on Locations 

    E-Print Network [OSTI]

    Zhang, Weiwei

    2014-11-21

    locations, which contributes to the Geographical Information Retrieval (GIR) systems. In addition to the traditional applications of GIR systems, which are used for finding locations in documents, GIR can be applied to other fields as well. Firstly, it can...

  4. SRC/ISMT Factory Operations Research Center FORCe:Factory Operations Research Center

    E-Print Network [OSTI]

    Fernandez, Emmanuel

    1 SRC/ISMT Factory Operations Research Center SRC/ISMT FORCe:Factory Operations Research Center Operations Research Center2 ·Project Overview/Status - Michael Fu, Project Director ·Overview of Software/ISMT Factory Operations Research Center Michael Fu, Ph.D. Institute for Systems Research University of Maryland

  5. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired SolarAbout /Two0 - 19PortalStatus Updates and Status CurrentStatus

  6. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired SolarAbout /Two0 - 19PortalStatus Updates and StatusStatus Updates

  7. Magnetic pulsing technique for tracking, locating pigs. [Locating pipeline servicing equipment using magnetic pulsing

    SciTech Connect (OSTI)

    Farque, J.A. (C.D.I., Broken Arrow, OK (United States))

    1994-01-01

    Magnetic transmission systems work well in conjunction with pipe line pigging. They have transmission characteristics that allow an operator to track a pig as it moves through the line with one antenna orientation, and locate a stationary pig and transmitter to within inches with another. Advanced systems offer pig run documentation features by recording the images of transmitter passages and their times and dates. These features will become increasingly important to pipe line owners and operators in the future as the EPA tightens its grip on the pipe line and gas industries. Additionally, pigging personnel with no real experience with the tracking or location of pigs can operate a magnetic system and be immediately productive. This lowers the overall cost to the service company, the pipe line owner, and ultimately the end user of the product.

  8. Tampa Electric Company Polk Power Station IGCC project: Project status

    SciTech Connect (OSTI)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D.

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  9. Location, location, location: The variable value of renewable energy and demand-side efficiency resources

    E-Print Network [OSTI]

    Fowlie, Meredith

    and renewable energy resources. We eval- uate renewable energy (RE) and energy efficiency (EE) technologiesLocation, location, location: The variable value of renewable energy and demand-side efficiency mitigation efforts in the electricity sector emphasize accelerated deployment of energy efficiency measures

  10. NIF Status Update - 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    news NIF Status Update - 2014 May Gigabar Equation-of-State Experiment Reaches Record Pressures On May 29, the NIF Team fired two gigabar (Gbar)-class equation-of-state experiments...

  11. Derivation of Locational Marginal Prices for Restructured Wholesale Power Markets

    E-Print Network [OSTI]

    Tesfatsion, Leigh

    the performance of these markets. In this paper, different AC and DC optimal power flow (OPF) models are presented Operator (MISO). Keywords: Locational marginal pricing, wholesale power market, AC optimal power flow, DC optimal power flow, U.S. Midwest Independent System Operator (MISO). #12;3 1 INTRODUCTION In an April 2003

  12. Hiding Location Information from Location-Based Services

    E-Print Network [OSTI]

    Hengartner, Urs

    that the architecture is powerful enough to support existing location- based services. Our architecture exploits Trusted-specific information is being accessed. I. INTRODUCTION The ubiquity of cellphones has lead to the introduction of a cellphone user (e.g., directions to a target location or a list of interesting, nearby places). Another

  13. Commencement Ceremony Department Time Location Department and Major Time Location

    E-Print Network [OSTI]

    Kaji, Hajime

    Engineering 15:30 Bldg. 63 Classroom 01 (2nd Fl.) Industrial and Management Systems Engineering 15:30 Bldg. 63 and Management 15:30 Bldg. 63 Classroom 01 (2nd Fl.) Department Time Location Department and Major Time Location:30 Bldg. 57 202 Modern Mechanical Engineering 10:30 Bldg. 57 202 Industrial and Management Systems

  14. Location Management for Mobile Devices

    E-Print Network [OSTI]

    Wilde, Erik

    2008-01-01

    general, and wireless and mobile devices in particular. Thelocation-enabled mobile devices and location-based services.information from mobile devices and making it available to

  15. Annual Hanford Site Environmental Permitting Status Report

    SciTech Connect (OSTI)

    HOMAN, N.A.

    2000-10-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year.

  16. Mobile Alternative Fueling Station Locator

    SciTech Connect (OSTI)

    Not Available

    2009-04-01

    The Department of Energy's Alternative Fueling Station Locator is available on-the-go via cell phones, BlackBerrys, or other personal handheld devices. The mobile locator allows users to find the five closest biodiesel, electricity, E85, hydrogen, natural gas, and propane fueling sites using Google technology.

  17. Guide to the Library Locations

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    Guide to the Libraries #12;Library Locations W.E.B. DU BOIS LIBRARY www.library.umass.edu 154 Hicks Way (413) 545-0150, (413) 545-2622 The Du Bois Library is the primary location for resources in education, geography, the humanities and fine arts, nursing, management, medicine, public health, and social

  18. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired SolarAbout /Two0 - 19PortalStatus Updates and Status Current

  19. Updates and Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired SolarAbout /Two0 - 19PortalStatus Updates and Status

  20. Status | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVESDepartmentSpecialCodetheDeliveryEnergy|ofStatusStatus

  1. Definitions Proposal Status

    E-Print Network [OSTI]

    Blennerhassett, Peter

    . Such reports may be distributed internally (within GMO) and/or to external parties. The automated events, please see the GMO Intranet, where a list of such event will be maintained. Related Topics: ·Status.g. A researcher has contacted GMO to request an application ID and has provided some basic information. The actual

  2. Status of the Design of the LBNE Neutrino Beamline

    SciTech Connect (OSTI)

    Andrews, R.; Chen, A.Z.; Childress, S.C.; Moore, C.D.; Papadimitriou, V.; /Fermilab; Campbell, M.R.; /Fermilab

    2012-05-01

    The Long Baseline Neutrino Experiment (LBNE) will utilize a neutrino beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a beam of neutrinos toward a detector placed at the Homestake Mine in South Dakota, about 1300 km away. The neutrinos are produced as follows: First, protons extracted from the MI-10 section of the Main Injector (60-120 GeV) hit a solid target above grade and produce mesons. Then, the charged mesons are focused by a set of focusing horns into a 200 m long decay pipe, towards the far detector. Finally, the mesons that enter the decay pipe decay into neutrinos. The parameters of the facility were determined taking into account several factors including the physics goals, the modelling of the facility, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be {approx}700 kW, however some of the parameters were chosen to be able to deal with a beam power of 2.3 MW in order to enable the facility to run with an upgraded accelerator complex. We discuss here the status of the design and the associated challenges.

  3. Status of the Pit Disassembly and Conversion Facility

    SciTech Connect (OSTI)

    Zygmunt, S. [Los Alamos National Lab., NM (United States); Peko, D. [Dept. of Energy, Washington, DC (United States). Office of Fissile Materials Disposition

    1998-12-31

    A planned new facility, the Pit Disassembly and Conversion Facility (PDCF) will be used to disassemble the nation`s inventory of surplus nuclear weapons pits and convert the plutonium recovered from those pits into a form suitable for storage, international inspection, and final disposition. Sized to handle 35 metric tons of plutonium from pits and other sources over its 10-year operating life, the PDCF will apply the Advanced Recovery and Integrated Extraction System (ARIES) technology. ARIES process technology has been developed at Los Alamos National Laboratory (LANL) and Lawrence Livermore National Laboratory (LLNL) and an integrated system is being demonstrated LANL. Four sites were considered for locating the PDCF: Pantex Plant, Savannah River Site (SRS), Idaho National Engineering and Environmental Laboratory (INEEL), and Hanford Site. Each site offers a different opportunity for constructing the PDCF, ranging from a new building at Pantex Plant to using an existing building at Hanford Site or INEEL. The Surplus Plutonium Disposition Environmental Impact Statement was prepared by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD) to aid in site selection. This paper describes the initial scoping activities, preconceptual and conceptual design work, and the status of the PDCF.

  4. Status Organizing Processes 

    E-Print Network [OSTI]

    Berger, Joseph; Rosenholtz, Susan J; Zelditch, Morris Jr

    2015-08-15

    STATUS ORGANIZING PROCESSES Joseph Berger Susan J. Rosenholtz Morris Zelditch, Jr. Technical Report #77 Stanford University January 1980 To appear in the Annual Review of Sociology, Vol. 6, 1980. This paper was prepared while Or. Rosenholtz was a... to take place--in such a way that the expectation-states are confirmed, hence maintained, by the very interaction that depends on them (Berger, 1958; Berger & Snell, 1961; Berger, Conner & McKeown, 1969; Berger & Conner, 1969, 1974; Fisek, 1968, 1974...

  5. SuperNEMO status

    SciTech Connect (OSTI)

    Chapon, A. [Universite de Caen Basse-Normandie, ENSICAEN, LPC Caen, UMR 6534, 6 boulevard du Marechal Juin, 14050 CAEN Cedex (France); Collaboration: SUPERNEMO Collaboration

    2011-12-16

    The SuperNEMO experiment aims to reach a sensitivity up to 10{sup 26} years on the half-life of neutrinoless double beta decay. The SuperNEMO project strongly inherits from the previous Nemo3 experiment. It will consist of a ''tracko-calo'' modular detector with at least 100 kg of betabeta isotope. The current status of the main R and D tasks will be presented: enrichment and production of source foils, radiopurity control, tracker and calorimeter.

  6. WORKPLACE HAZARD ASSESSMENT Location: Task

    E-Print Network [OSTI]

    Rubloff, Gary W.

    WORKPLACE HAZARD ASSESSMENT Location: Task: Performed by: Date: This form may be used as an aid in performing hazard assessment. Review listed hazard classifications, identify all hazards, possible hazards and their sources. Hazard classification listing is not intended to be complete but is provided as a guide

  7. Status of Corrective Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Director for Environmental Programs (ADEP), the Principal Associate Director for Operations (PADOPS) and the Principal Associate Director for Science, Technology and...

  8. Status of Electroweak Physics

    E-Print Network [OSTI]

    Sauvan, Emmanuel; The ATLAS collaboration

    2015-01-01

    A summary of experimental tests at high energy colliders of the electroweak sector of the Standard Model is presented. Status of experimental measurements of two key parameters, the mass of the $W$ boson and the effective leptonic weak mixing angle are reviewed. But main recent experimental advances in electroweak physics are related to self coupling of the gauge bosons. Most recent measurements of diboson production and their interpretation in terms of limits on anomalous triple gauge couplings are discussed. Finally, first experimental evidences of the coupling of four gauge bosons, through triboson production or vector boson scattering are presented.

  9. Status of Climate Change 

    E-Print Network [OSTI]

    North, G.

    2013-01-01

    stream_source_info ESL-KT-13-12-56.pdf.txt stream_content_type text/plain stream_size 3413 Content-Encoding UTF-8 stream_name ESL-KT-13-12-56.pdf.txt Content-Type text/plain; charset=UTF-8 Status of Climate Change 2013... CaTee Conference San Antonio 2013 ESL-KT-13-12-56 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Menu for Today • IPCC 2013: Assessment Report #5 • Facts about Climate Change • Who will Win, Who will Lose...

  10. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    SciTech Connect (OSTI)

    Dobson, D; Churby, A; Krieger, E; Maloy, D; White, K

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  11. Operations Training Program Status Report 1/28/99

    E-Print Network [OSTI]

    (KSA), which define their job classification, and enables them to find potential sources to acquire ~6 months and has been in use for 5 years. 5. Video Library We maintain a library of 75 videotapes that are used as reference materials in the training program. We add to this library twice a year during

  12. Westinghouse Hanford Company Operational Groundwater status report, 1990--1992

    SciTech Connect (OSTI)

    Johnson, V.G.

    1993-03-01

    This report presents information related to the water quality of ground water at the Hanford Reservation. Included are plume maps, geology, hydrology, and information on various effluent sources.

  13. Status of TMX upgrade diagnostics construction

    SciTech Connect (OSTI)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-07-20

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan.

  14. Joint microseismic event location with uncertain velocity

    E-Print Network [OSTI]

    Poliannikov, Oleg V.

    2013-01-01

    We study the problem of the joint location of seismic events using an array of receivers. We show that locating multiple seismic events simultaneously is advantageous compared to the more traditional approaches of locating ...

  15. Location and Hours | ornl.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Location and Hours Location The ORNL Research Library is located off the central corridor of Bldg. 4500N on the main ORNL campus. Hours The library is open 24 hours, seven days a...

  16. Status and First Results of the MAGIC Telescope

    E-Print Network [OSTI]

    J. Cortina; for the MAGIC collaboration

    2004-07-22

    The 17 m MAGIC Cherenkov telescope for gamma ray astronomy between 30 and 300 GeV started operations in its final configuration in October 2003 and is currently well into its calibration phase. Here I report on its present status and its first gamma ray source detections.

  17. Spurious Status Changes in Array E NO. REV. N~.

    E-Print Network [OSTI]

    Rathbun, Julie A.

    volt switching circuit. The relay which Command 110 controls selects redundant power routes to the main, several changes of status occurred at turn-on, PC changeover or following other power interruptions of these anomalies, and discusses possible design changes to eliminate the discrepant operation. Prepared by:

  18. operations center

    National Nuclear Security Administration (NNSA)

    servers and other critical Operations Center equipment

  19. Independent air supply system filtered to protect against biological and radiological agents (99.7%).
  20. <...

  21. Optimized Fault Location Final Project Report

    E-Print Network [OSTI]

    Optimized Fault Location Final Project Report Power Systems Engineering Research Center A National Engineering Research Center Optimized Fault Location Concurrent Technologies Corporation Final Project Report

  22. Energy Department Launches Alternative Fueling Station Locator...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Launches Alternative Fueling Station Locator App Energy Department Launches Alternative Fueling Station Locator App November 7, 2013 - 11:16am Addthis As part of the Obama...

  1. Ombuds Office Location & Hours

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEY UNIVERSEHowScientificOmbuds Office Location & Hours Ombuds

  2. Qualification Status List (QSL Package)

    E-Print Network [OSTI]

    Rathbun, Julie A.

    #12;ALSEP Qualification Status List (QSL Package) Flight 3 Configuration #12;NO. ltiY. NO15 C/S T.imer Bl7 2.3 Passive Seismic Experiment (Bl8-B21) PSE Sensor Assembly Bl8 PSE C. RI!V. NO. Qualification Status List ALSEP Array B Configuration 1. 0 INTRODUCTION ATM 825 PAGI! 1

  3. ACRF Ingest Software Status: New, Current, and Future - March 2008

    SciTech Connect (OSTI)

    AS Koontz; S Choudhury; BD Ermold; NN Keck; KL Gaustad; RC Perez

    2008-03-01

    The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF). The report is divided into four sections: (1) news about ingests currently under development, (2) current production ingests, (3) future ingest development plans, and (4) information on retired ingests. Please note that datastreams beginning in “xxx” indicate cases where ingests run at multiple ACRF sites, which results in a datastream(s) for each location.

  4. Short range radio locator system

    DOE Patents [OSTI]

    McEwan, T.E.

    1996-12-31

    A radio location system comprises a wireless transmitter that outputs two megahertz period bursts of two gigahertz radar carrier signals. A receiver system determines the position of the transmitter by the relative arrival of the radar bursts at several component receivers set up to have a favorable geometry and each one having a known location. One receiver provides a synchronizing gating pulse to itself and all the other receivers. The rate of the synchronizing gating pulse is slightly offset from the rate of the radar bursts themselves, so that each sample collects one finely-detailed piece of information about the time-of-flight of the radar pulse to each receiver each pulse period. Thousands of sequential pulse periods provide corresponding thousand of pieces of information about the time-of-flight of the radar pulse to each receiver, in expanded, not real time. Therefore the signal processing can be done with relatively low-frequency, inexpensive components. A conventional microcomputer is then used to find the position of the transmitter by geometric triangulation based on the relative time-of-flight information. 5 figs.

  5. Short range radio locator system

    DOE Patents [OSTI]

    McEwan, Thomas E. (Livermore, CA)

    1996-01-01

    A radio location system comprises a wireless transmitter that outputs two megahertz period bursts of two gigahertz radar carrier signals. A receiver system determines the position of the transmitter by the relative arrival of the radar bursts at several component receivers set up to have a favorable geometry and each one having a known location. One receiver provides a synchronizing gating pulse to itself and all the other receivers to sample the ether for the radar pulse. The rate of the synchronizing gating pulse is slightly offset from the rate of the radar bursts themselves, so that each sample collects one finely-detailed piece of information about the time-of-flight of the radar pulse to each receiver each pulse period. Thousands of sequential pulse periods provide corresponding thousand of pieces of information about the time-of-flight of the radar pulse to each receiver, in expanded, not real time. Therefore the signal processing can be done with relatively low-frequency, inexpensive components. A conventional microcomputer is then used to find the position of the transmitter by geometric triangulation based on the relative time-of-flight information.

  6. Asynchronous parallel status comparator

    DOE Patents [OSTI]

    Arnold, J.W.; Hart, M.M.

    1992-12-15

    Disclosed is an apparatus for matching asynchronously received signals and determining whether two or more out of a total number of possible signals match. The apparatus comprises, in one embodiment, an array of sensors positioned in discrete locations and in communication with one or more processors. The processors will receive signals if the sensors detect a change in the variable sensed from a nominal to a special condition and will transmit location information in the form of a digital data set to two or more receivers. The receivers collect, read, latch and acknowledge the data sets and forward them to decoders that produce an output signal for each data set received. The receivers also periodically reset the system following each scan of the sensor array. A comparator then determines if any two or more, as specified by the user, of the output signals corresponds to the same location. A sufficient number of matches produces a system output signal that activates a system to restore the array to its nominal condition. 4 figs.

  7. Asynchronous parallel status comparator

    DOE Patents [OSTI]

    Arnold, Jeffrey W. (828 Hickory Ridge Rd., Aiken, SC 29801); Hart, Mark M. (223 Limerick Dr., Aiken, SC 29803)

    1992-01-01

    Apparatus for matching asynchronously received signals and determining whether two or more out of a total number of possible signals match. The apparatus comprises, in one embodiment, an array of sensors positioned in discrete locations and in communication with one or more processors. The processors will receive signals if the sensors detect a change in the variable sensed from a nominal to a special condition and will transmit location information in the form of a digital data set to two or more receivers. The receivers collect, read, latch and acknowledge the data sets and forward them to decoders that produce an output signal for each data set received. The receivers also periodically reset the system following each scan of the sensor array. A comparator then determines if any two or more, as specified by the user, of the output signals corresponds to the same location. A sufficient number of matches produces a system output signal that activates a system to restore the array to its nominal condition.

  8. Lease Operations Environmental Guidance Document

    SciTech Connect (OSTI)

    Bureau of Land Management

    2001-02-14

    This report contains discussions in nine different areas as follows: (1) Good Lease Operating Practices; (2) Site Assessment and Sampling; (3) Spills/Accidents; (4) Containment and Disposal of Produced Waters; (5) Restoration of Hydrocarbon Impacted Soils; (6) Restoration of Salt Impacted Soils; (7) Pit Closures; (8) Identification, Removal and Disposal of Naturally Occurring Radioactive Materials (NORM); and (9) Site Closure and Construction Methods for Abandonment Wells/Locations. This report is primary directed towards the operation of oil and gas producing wells.

  9. Interdisciplinary Research Teams as Status Systems 

    E-Print Network [OSTI]

    Kruse, Ronald J; Anbar, Michael; Burns, Sarah E; Cohen, Bernard P

    2015-08-15

    Research teams may be studied as social systems organized along dimensions of status, such as rights to evaluate others and to allocate rewards. “Status consistency” is the degree to which salient statuses an individual possesses are at the same...

  10. Fault Locating, Prediction and Protection (FLPPS)

    SciTech Connect (OSTI)

    Yinger, Robert, J.; Venkata, S., S.; Centeno, Virgilio

    2010-09-30

    One of the main objectives of this DOE-sponsored project was to reduce customer outage time. Fault location, prediction, and protection are the most important aspects of fault management for the reduction of outage time. In the past most of the research and development on power system faults in these areas has focused on transmission systems, and it is not until recently with deregulation and competition that research on power system faults has begun to focus on the unique aspects of distribution systems. This project was planned with three Phases, approximately one year per phase. The first phase of the project involved an assessment of the state-of-the-art in fault location, prediction, and detection as well as the design, lab testing, and field installation of the advanced protection system on the SCE Circuit of the Future located north of San Bernardino, CA. The new feeder automation scheme, with vacuum fault interrupters, will limit the number of customers affected by the fault. Depending on the fault location, the substation breaker might not even trip. Through the use of fast communications (fiber) the fault locations can be determined and the proper fault interrupting switches opened automatically. With knowledge of circuit loadings at the time of the fault, ties to other circuits can be closed automatically to restore all customers except the faulted section. This new automation scheme limits outage time and increases reliability for customers. The second phase of the project involved the selection, modeling, testing and installation of a fault current limiter on the Circuit of the Future. While this project did not pay for the installation and testing of the fault current limiter, it did perform the evaluation of the fault current limiter and its impacts on the protection system of the Circuit of the Future. After investigation of several fault current limiters, the Zenergy superconducting, saturable core fault current limiter was selected for installation. Because of some testing problems with the Zenergy fault current limiter, installation was delayed until early 2009 with it being put into operation on March 6, 2009. A malfunction of the FCL controller caused the DC power supply to the superconducting magnet to be turned off. This inserted the FCL impedance into the circuit while it was in normal operation causing a voltage resonance condition. While these voltages never reached a point where damage would occur on customer equipment, steps were taken to insure this would not happen again. The FCL was reenergized with load on December 18, 2009. A fault was experienced on the circuit with the FCL in operation on January 14, 2010. The FCL operated properly and reduced the fault current by about 8%, what was expected from tests and modeling. As of the end of the project, the FCL was still in operation on the circuit. The third phase of the project involved the exploration of several advanced protection ideas that might be at a state where they could be applied to the Circuit of the Future and elsewhere in the SCE electrical system. Based on the work done as part of the literature review and survey, as well as a number of internal meetings with engineering staff at SCE, a number of ideas were compiled. These ideas were then evaluated for applicability and ability to be applied on the Circuit of the Future in the time remaining for the project. Some of these basic ideas were implemented on the circuit including measurement of power quality before and after the FCL. It was also decided that we would take what was learned as part of the Circuit of the Future work and extend it to the next generation circuit protection for SCE. Also at this time, SCE put in a proposal to the DOE for the Irvine Smart Grid Demonstration using ARRA funding. SCE was successful in obtaining funding for this proposal, so it was felt that exploration of new protection schemes for this Irvine Smart Grid Demonstration would be a good use of the project resources. With this in mind, a protection system that uses fault interrupting switches, hi

  11. 40 CFR 265 interim status indicator-evaluation ground-water monitoring plan for the 216-B-63 trench

    SciTech Connect (OSTI)

    Bjornstad, B.N.; Dudziak, S.

    1989-03-01

    This document outlines a ground-water monitoring plan for the 216-B-63 trench located in the northeast corner of the 200-East Area on the Hanford Site in southeastern Washington State. It has been determined that hazardous materials (corrosives) were disposed of to the trench during past operations. Installation of an interim-status ground-water monitoring system is required to determine whether hazardous chemicals are leaching to the ground water from beneath the trench. This document summarizes the existing data that are available from near the 216-B-63 trench and presents a plan to determine the extent of ground-water contamination, if any, derived from the trench. The plan calls for the installation of four new monitoring wells located near the west end of the trench. These wells will be used to monitor ground-water levels and water quality immediately adjacent to the trench. Two existing RCRA monitoring wells, which are located near the trench and hydraulically upgradient of it, will be used as background wells. 46 refs., 15 figs., 12 tabs.

  12. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  13. Inventory pre-positioning for humanitarian operations

    E-Print Network [OSTI]

    Akkihal, Anup Roop

    2006-01-01

    This research examines the impact of inventory pre-positioning on humanitarian operations. The study identifies optimal locations for warehousing non-consumable inventories required for initial deployment of aid. These ...

  14. Request for Information: Operation of Regional Test Center Test...

    Broader source: Energy.gov (indexed) [DOE]

    Contact Us Offices Solicitation Title: Request for Information: Operation of Regional Test Center Test Bed Located at SolarTAC Funding Number: DE-FOA-0001454 Description: The...

  15. Energy Department Issues Draft Request for Proposals for Operation...

    Energy Savers [EERE]

    manage and operate DOE's Pacific Northwest National Laboratory (PNNL). PNNL is a world-class multi-program national laboratory located in Richland, Washington, whose mission is to...

  16. Guide to good practices for control of equipment and system status

    SciTech Connect (OSTI)

    NONE

    1998-12-01

    This Guide to Good Practices is written to enhance understanding of, and provide direction for, Control of Equipment and System Status, Chapter VIII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing equipment and system status control programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Control of Equipment and System Status is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the need for a formal status control program to promote safe and efficient operations.

  17. Status of MICE

    SciTech Connect (OSTI)

    Soler, F. J. P.

    2010-03-30

    The Muon Ionization Cooling Experiment (MICE) is an experiment currently under construction at the Rutherford Appleton Laboratory (RAL) in the UK. The aim of the experiment is to demonstrate the concept of ionization cooling for a beam of muons, crucial for the requirements of a Neutrino Factory and a Muon Collider. Muon cooling is achieved by measuring the reduction of the four dimensional transverse emittance for a beam of muons passing through low density absorbers and then accelerating the longitudinal component of the momentum using RF cavities. The absorbers are maintained in a focusing magnetic field to reduce the beta function of the beam and the RF cavities are kept inside coupling coils. The main goal of MICE is to measure a fractional drop in emittance, of order -10% for large emittance beams, with an accuracy of 1%(which imposes a requirement that the absolute emittance be measured with an accuracy of 0.1%). This paper will discuss the status of MICE, including the progress in commissioning the muon beam line at the ISIS accelerator at RAL, the construction of the different detector elements in MICE and the prospects for the future.

  18. Disruption Management ( Operations Research between planning ...

    E-Print Network [OSTI]

    record: it can deliver high quality solutions for planning problems. .... w e have w orked on is that in order to carry out the daily operation , companies. 3 .... moves based on the current status of the storage and the kno w ledge on the future.

  19. Operating Strategies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating Oak Ridge'sOPERATING

  20. Locational-based Coupling of Electricity Markets: Benefits from Coordinating Unit Commitment and Balancing Markets

    E-Print Network [OSTI]

    van der Weijde, Adriaan Hendrik; Hobbs, Benjamin F.

    their own market areas, while attempting to maintain day-ahead schedules of international power exchange (Oggioni & Smeers 2009). If neighbouring operators could coordinate their balancing markets while respecting locational constraints, redispatch costs...

  1. Status of Oregon's Bull Trout.

    SciTech Connect (OSTI)

    Buchanan, David V.; Hanson, Mary L.; Hooton, Robert M.

    1997-10-01

    Limited historical references indicate that bull trout Salvelinus confluentus in Oregon were once widely spread throughout at least 12 basins in the Klamath River and Columbia River systems. No bull trout have been observed in Oregon's coastal systems. A total of 69 bull trout populations in 12 basins are currently identified in Oregon. A comparison of the 1991 bull trout status (Ratliff and Howell 1992) to the revised 1996 status found that 7 populations were newly discovered and 1 population showed a positive or upgraded status while 22 populations showed a negative or downgraded status. The general downgrading of 32% of Oregon's bull trout populations appears largely due to increased survey efforts and increased survey accuracy rather than reduced numbers or distribution. However, three populations in the upper Klamath Basin, two in the Walla Walla Basin, and one in the Willamette Basin showed decreases in estimated population abundance or distribution.

  2. Fusion technology status and requirements

    SciTech Connect (OSTI)

    Thomassen, K.I.

    1982-01-26

    This paper summarizes the status of fusion technology and discusses the requirements to be met in order to build a demonstration fusion plant. Strategies and programmatic considerations in pursuing engineering feasibility are also outlined.

  3. Status Characteristics and Expectation States 

    E-Print Network [OSTI]

    Berger, Joseph; Cohen, Bernard P.; Zelditch, Morris Jr.

    2015-07-19

    -Type text/plain; charset=UTF-8 STATUS CHARACTERISTICS AND EXPECTATION STATES* Joseph Berger Bernard P. Cohen Morris Zelditch, Jr. Research for this paper was conducted with the support of NSF grant #G23990? for investigation of authority...

  4. Status of Hydrogen Storage Technologies

    Office of Energy Efficiency and Renewable Energy (EERE)

    The current status in terms of weight, volume, and cost of various hydrogen storage technologies is shown below. These values are estimates from storage system developers and the R&D community...

  5. Extracting Patterns from Location History Andrew Kirmse

    E-Print Network [OSTI]

    Cortes, Corinna

    " to infer the user's important locations. The "Place lab client" infers locations by listening to RF-emissions different modes of transportation (e.g. bus, on foot, car etc.). Both these papers use clean regularly-sampled

  6. Homodyne impulse radar hidden object locator

    DOE Patents [OSTI]

    McEwan, T.E.

    1996-04-30

    An electromagnetic detector is designed to locate an object hidden behind a separator or a cavity within a solid object. The detector includes a PRF generator for generating 2 MHz pulses, a homodyne oscillator for generating a 2 kHz square wave, and for modulating the pulses from the PRF generator. A transmit antenna transmits the modulated pulses through the separator, and a receive antenna receives the signals reflected off the object. The receiver path of the detector includes a sample and hold circuit, an AC coupled amplifier which filters out DC bias level shifts in the sample and hold circuit, and a rectifier circuit connected to the homodyne oscillator and to the AC coupled amplifier, for synchronously rectifying the modulated pulses transmitted over the transmit antenna. The homodyne oscillator modulates the signal from the PRF generator with a continuous wave (CW) signal, and the AC coupled amplifier operates with a passband centered on that CW signal. The present detector can be used in several applications, including the detection of metallic and non-metallic objects, such as pipes, studs, joists, nails, rebars, conduits and electrical wiring, behind wood wall, ceiling, plywood, particle board, dense hardwood, masonry and cement structure. The detector is portable, light weight, simple to use, inexpensive, and has a low power emission which facilitates the compliance with Part 15 of the FCC rules. 15 figs.

  7. Homodyne impulse radar hidden object locator

    DOE Patents [OSTI]

    McEwan, Thomas E. (Livermore, CA)

    1996-01-01

    An electromagnetic detector is designed to locate an object hidden behind a separator or a cavity within a solid object. The detector includes a PRF generator for generating 2 MHz pulses, a homodyne oscillator for generating a 2 kHz square wave, and for modulating the pulses from the PRF generator. A transmit antenna transmits the modulated pulses through the separator, and a receive antenna receives the signals reflected off the object. The receiver path of the detector includes a sample and hold circuit, an AC coupled amplifier which filters out DC bias level shifts in the sample and hold circuit, and a rectifier circuit connected to the homodyne oscillator and to the AC coupled amplifier, for synchronously rectifying the modulated pulses transmitted over the transmit antenna. The homodyne oscillator modulates the signal from the PRF generator with a continuous wave (CW) signal, and the AC coupled amplifier operates with a passband centered on that CW signal. The present detector can be used in several applications, including the detection of metallic and non-metallic objects, such as pipes, studs, joists, nails, rebars, conduits and electrical wiring, behind wood wall, ceiling, plywood, particle board, dense hardwood, masonry and cement structure. The detector is portable, light weight, simple to use, inexpensive, and has a low power emission which facilitates the compliance with Part 15 of the FCC rules.

  8. TAGGING, TRACKING AND LOCATING WITHOUT GPS

    SciTech Connect (OSTI)

    Cordaro, J.; Coleman, T.; Shull, D.

    2012-07-08

    The Savannah River National Laboratory (SRNL) was requested to lead a Law Enforcement Working Group that was formed to collaborate on common operational needs. All agencies represented on the working group ranked their need to tag, track, and locate a witting or unwitting target as their highest priority. Specifically, they were looking for technologies more robust than Global Positioning Satellite (GPS), could communicate back to the owner, and worked where normal cell phone communications did not work or were unreliable. SRNL brought together multiple technologies in a demonstration that was held in in various Alaska venues, including metropolitan, wilderness, and at-sea that met the working group's requirements. Using prototypical technologies from Boeing, On Ramp, and Fortress, SRNL was able to demonstrate the ability to track personnel and material in all scenarios including indoors, in heavily wooden areas, canyons, and in parking garages. In all cases GPS signals were too weak to measure. Bi-directional communication was achieved in areas that Wi-Fi, cell towers, or traditional radios would not perform. The results of the exercise will be presented. These technologies are considered ideal for tracking high value material such has nuclear material with a platform that allows seamless tracking anywhere in the world, indoors or outdoors.

  9. SAPLE: Sandia Advanced Personnel Locator Engine.

    SciTech Connect (OSTI)

    Procopio, Michael J.

    2010-04-01

    We present the Sandia Advanced Personnel Locator Engine (SAPLE) web application, a directory search application for use by Sandia National Laboratories personnel. SAPLE's purpose is to return Sandia personnel 'results' as a function of user search queries, with its mission to make it easier and faster to find people at Sandia. To accomplish this, SAPLE breaks from more traditional directory application approaches by aiming to return the correct set of results while placing minimal constraints on the user's query. Two key features form the core of SAPLE: advanced search query interpretation and inexact string matching. SAPLE's query interpretation permits the user to perform compound queries when typing into a single search field; where able, SAPLE infers the type of field that the user intends to search on based on the value of the search term. SAPLE's inexact string matching feature yields a high-quality ranking of personnel search results even when there are no exact matches to the user's query. This paper explores these two key features, describing in detail the architecture and operation of SAPLE. Finally, an extensive analysis on logged search query data taken from an 11-week sample period is presented.

  10. Essays in Social Status and Finance

    E-Print Network [OSTI]

    Barradale, Nigel

    2010-01-01

    and Intertemporal Preferences Key Words: Consumer Finance;Household Finance;Experimental Finance; Social Status; Discounting;

  11. PROBABILISTIC METHODS FOR LOCATION ESTIMATION IN

    E-Print Network [OSTI]

    Myllymäki, Petri

    PROBABILISTIC METHODS FOR LOCATION ESTIMATION IN WIRELESS NETWORKS Petri Kontkanen, Petri Myllym;PROBABILISTIC METHODS FOR LOCATION ESTIMATION IN WIRELESS NETWORKS Petri Kontkanen, Petri Myllym¨aki, Teemu Roos METHODS FOR LOCATION ESTIMATION IN WIRELESS NETWORKS Petri Kontkanen, Petri Myllymäki, Teemu Roos, Henry

  12. APS Storage Ring Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach HomeA Better Anode Design to Improve4AJ01) (See EnergyCurrent : 0.0 Waiting for Injection Operations

  13. Operation Poorman

    SciTech Connect (OSTI)

    Pruvost, N.; Tsitouras, J.

    1981-03-18

    The objectives of Operation Poorman were to design and build a portable seismic system and to set up and use this system in a cold-weather environment. The equipment design uses current technology to achieve a low-power, lightweight system that is configured into three modules. The system was deployed in Alaska during wintertime, and the results provide a basis for specifying a mission-ready seismic verification system.

  14. Current status of the GLASS code

    SciTech Connect (OSTI)

    Hootman, H.E. [Westinghouse Savannah River Co., Aiken, SC (United States); Honeck, H.C. [Computer Application Technology, Inc., Aiken, SC (United States)

    1991-12-31

    This paper summarizes the current status of the Generalized Lattice Analysis SubSystem (GLASS) computer code and its supporting cross section libraries. GLASS was developed at the Savannah River Site (SRS) in the early 1970`s. The GLASS code has been instrumental in supporting safe Heavy Water Reactor (HWR) operations and predicting material production at SRS for more than 20 years. The Department of Energy Office of New Production Reactors (ONPR) program has chosen to use the GLASS code for the design of the HWR option of the New Production Reactor (NPR). A substantial body of validation calculations have been performed and additional validation calculations will be performed to qualify the new GLASS multigroup cross section libraries derived from the ENDF/B-5 and 6 nuclear data files. Several improvements to the code are in progress. Many other improvements are planned to bring GLASS up to modern physics and compute technology.

  15. Annual Hanford Site Environmental Permitting status report

    SciTech Connect (OSTI)

    SONNICHSEN, J.C.

    1999-10-18

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

  16. Performing an allreduce operation using shared memory

    DOE Patents [OSTI]

    Archer, Charles J. (Rochester, MN); Dozsa, Gabor (Ardsley, NY); Ratterman, Joseph D. (Rochester, MN); Smith, Brian E. (Rochester, MN)

    2012-04-17

    Methods, apparatus, and products are disclosed for performing an allreduce operation using shared memory that include: receiving, by at least one of a plurality of processing cores on a compute node, an instruction to perform an allreduce operation; establishing, by the core that received the instruction, a job status object for specifying a plurality of shared memory allreduce work units, the plurality of shared memory allreduce work units together performing the allreduce operation on the compute node; determining, by an available core on the compute node, a next shared memory allreduce work unit in the job status object; and performing, by that available core on the compute node, that next shared memory allreduce work unit.

  17. Performing an allreduce operation using shared memory

    SciTech Connect (OSTI)

    Archer, Charles J; Dozsa, Gabor; Ratterman, Joseph D; Smith, Brian E

    2014-06-10

    Methods, apparatus, and products are disclosed for performing an allreduce operation using shared memory that include: receiving, by at least one of a plurality of processing cores on a compute node, an instruction to perform an allreduce operation; establishing, by the core that received the instruction, a job status object for specifying a plurality of shared memory allreduce work units, the plurality of shared memory allreduce work units together performing the allreduce operation on the compute node; determining, by an available core on the compute node, a next shared memory allreduce work unit in the job status object; and performing, by that available core on the compute node, that next shared memory allreduce work unit.

  18. Status of LHC crab activity simulations and beam studies

    SciTech Connect (OSTI)

    Calaga,R.; Assman, R.; Barranco, J.; Barranco, J.; Calaga, R.; Caspers, F.; Ciapala, E.; De-Maria, R.; Koutchouk, J. P.; Linnecar, T.; Metral, E.; Morita, A.; Solyak, N.; Sun, Y.; Tomas, R.; Tuckmantel, J.; Weiler, T.; Zimmermann, F.

    2009-05-04

    The LHC crab cavity program is advancing rapidly towards a first prototype which is anticipated to be tested during the early stages of the LHC phase I upgrade and commissioning. The general project status and some aspects related to crab optics, collimation, aperture constraints, impedances, noise effects. beam transparency and machine protection critical for a safe and robust operation of LHC beams with crab cavities are addressed here.

  19. Operations Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating Oakoak ridge

  20. Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating Oakoak

  1. Feasibility of Locating Tumours in Lung via Kinesthetic Feedback Greig L. McCreery

    E-Print Network [OSTI]

    Naish, Michael D.

    Feasibility of Locating Tumours in Lung via Kinesthetic Feedback Greig L. McCreery Ana Luisa Trejos Michael D. Naish Rajni V. Patel Richard A. Malthaner Abstract Background Localizing lung tumours during-operative imaging cannot map directly to the intra-operative lung. This study analyzes the force sensing performance

  2. Community Detection from Location-Tagged Networks

    E-Print Network [OSTI]

    Liu, Zhi

    2015-01-01

    Many real world systems or web services can be represented as a network such as social networks and transportation networks. In the past decade, many algorithms have been developed to detect the communities in a network using connections between nodes. However in many real world networks, the locations of nodes have great influence on the community structure. For example, in a social network, more connections are established between geographically proximate users. The impact of locations on community has not been fully investigated by the research literature. In this paper, we propose a community detection method which takes locations of nodes into consideration. The goal is to detect communities with both geographic proximity and network closeness. We analyze the distribution of the distances between connected and unconnected nodes to measure the influence of location on the network structure on two real location-tagged social networks. We propose a method to determine if a location-based community detection...

  3. Earthquake locations and seismic velocity models for Southern California

    E-Print Network [OSTI]

    Lin, Guoqing

    2007-01-01

    Linearized EarthquakeChapter 4. The COMPLOC Earthquake Location3-D Simultaneous Earthquake Locations and

  4. Fukushima Daiichi Information Repository FY13 Status

    SciTech Connect (OSTI)

    Curtis Smith; Cherie Phelan; Dave Schwieder

    2013-09-01

    The accident at the Fukushima Daiichi nuclear power station in Japan is one of the most serious in commercial nuclear power plant operating history. Much will be learned that may be applicable to the U.S. reactor fleet, nuclear fuel cycle facilities, and supporting systems, and the international reactor fleet. For example, lessons from Fukushima Daiichi may be applied to emergency response planning, reactor operator training, accident scenario modeling, human factors engineering, radiation protection, and accident mitigation; as well as influence U.S. policies towards the nuclear fuel cycle including power generation, and spent fuel storage, reprocessing, and disposal. This document describes the database used to establish a centralized information repository to store and manage the Fukushima data that has been gathered. The data is stored in a secured (password protected and encrypted) repository that is searchable and available to researchers at diverse locations.

  5. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    SciTech Connect (OSTI)

    Not Available

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  6. Geographic and Operational Site Parameters List (GOSPL) for Hanford Assessments

    SciTech Connect (OSTI)

    Last, George V.; Nichols, William E.; Kincaid, Charles T.

    2006-06-01

    This data package was originally prepared to support a 2004 composite analysis (CA) of low-level waste disposal at the Hanford Site. The Technical Scope and Approach for the 2004 Composite Analysis of Low Level Waste Disposal at the Hanford Site (Kincaid et. al. 2004) identified the requirements for that analysis and served as the basis for initial preparation of this data package. Completion of the 2004 CA was later deferred, with the 2004 Annual Status Report for the Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site (DOE 2005) indicating that a comprehensive update to the CA was in preparation and would be submitted in 2006. However, the U.S. Department of Energy (DOE) has recently decided to further defer the CA update and will use the cumulative assessment currently under preparation for the environmental impact statement (EIS) being prepared for tank closure and other site decisions as the updated CA. Submittal of the draft EIS is currently planned for FY 2008. This data package describes the facility-specific parameters (e.g. location, operational dates, etc.) used to numerically simulate contaminant flow and transport in large-scale Hanford assessments. Kincaid et al. (2004) indicated that the System Assessment Capability (SAC) (Kincaid et al. 2000; Bryce et al. 2002; Eslinger 2002a, 2002b) would be used to analyze over a thousand different waste sites. A master spreadsheet termed the Geographic and Operational Site Parameters List (GOSPL) was assembled to facilitate the generation of keyword input files containing general information on each waste site/facility, its operational/disposal history, and its environmental settings (past, current, and future). This report briefly describes each of the key data fields, including the source(s) of data, and provides the resulting inputs to be used for large-scale Hanford assessments.

  7. Complete LNG Terminal Status Maps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complete LNG Terminal Status Maps Complete LNG Terminal Status Maps A series of slides showing the status of various LNG terminals (existing, under construction, proposed, etc.) in...

  8. Advanced Collaborative Emissions Study (ACES): Phase 2 Status...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Phase 2 Status Report Advanced Collaborative Emissions Study (ACES): Phase 2 Status Report Discusses status of ACES, a cooperative multi-party effort to characterize emissions...

  9. Status and Future of TRANSCOM | Department of Energy

    Office of Environmental Management (EM)

    and Future of TRANSCOM Status and Future of TRANSCOM Current Program Status Upcoming Changes Glimpse at Future Options DOE Commitments Status and Future of TRANSCOM More Documents...

  10. RENEWABLES 2007 GLOBAL STATUS REPORT

    E-Print Network [OSTI]

    Kammen, Daniel M.

    RENEWABLES 2007 GLOBAL STATUS REPORT www.ren21.net #12;Renewable Energy Policy Network for the 21st renewable energy. It provides a forum for leadership and exchange in international policy processes. It bolsters appropriate policies that increase the wise use of renewable energies in developing

  11. Status Conditions of Self Evaluation 

    E-Print Network [OSTI]

    Berger, Joseph; Zeldtich, Morris Jr; Anderson, Bo; Cohen, Bernard P

    2015-07-28

    /plain; charset=UTF-8 Status Conditions of Self-Evaluation by Joseph Berger Morris Zelditch, Jr. Bo Anderson Bernard Cohen This paper was supported in part by NSF grant #G23990, for the study of authority and evaluations, and in part by NSF grant #GS...

  12. Status of the flora and fauna on the Nevada Test Site, 1989--1991

    SciTech Connect (OSTI)

    Hunter, R.B.

    1994-03-01

    This volume includes six reports of monitoring work to determine the status of and trends in flora and fauna populations on the Nevada Test Site (NTS) from 1989 through 1991. The Nevada Operations Office of the US Department of Energy supported monitoring under its Basic Environmental Compliance and Monitoring Program (BECAMP) since 1987. Under this program several undisturbed baseline plots, and numerous plots in disturbed areas, are sampled on annual or three-year cycles. Perennial plant populations, ephemeral plants, small mammals, reptiles, birds, and large mammals were monitored. Monitoring results are reported for five baseline sites, one from each major landform on the NTS (Jackass Flats, Frenchman Flat, Yucca Flat, Pahute Mesa, and Rainier Mesa), and for areas cleared of vegetation by fires, atmospheric nuclear weapons tests, construction, and gophers. Roadside flora and fauna were studied at two locations, and several historical study plots around the NTS were recensused to determine vegetation changes over long time spans. Three subsidence craters resulting from below-ground nuclear weapons tests were also studied. A major influence on plants and animals during the report period was a severe drought during 1989 and 1990, followed by more moderate drought in 1991.

  13. Locating and tracking assets using RFID 

    E-Print Network [OSTI]

    Kim, Gak Gyu

    2009-05-15

    , this research presents a math¬ematical model of using RFID (both handheld readers and stationary readers) for e?cient asset location. We derive the expected cost of locating RFID¬tagged objects in a multi¬area environment where hand¬held RF readers are used. We...

  14. Worldwide status of energy standards for buildings: Appendices

    SciTech Connect (OSTI)

    Janda, K.B.; Busch, J.F.

    1993-02-01

    This informal survey was designed to gain information about the worldwide status of energy efficiency standards for buildings, particularly non-residential buildings such as offices, schools, and hotels. The project has three goals: 1. To understand and learn from the experience of countries with existing building energy standards; 2. To locate areas where these lessons might be applied and energy standards might be effectively proposed and developed; and 3. To share the information gathered with all participating countries. These appendices include the survey cover letter, the survey, and the details of selected energy standards in 35 countries, thus providing supporting material for the authors` article of the same title.

  15. Groundwater Level Status Report for 2005 Los Alamos National Laboratory

    SciTech Connect (OSTI)

    S.P. Allen; R.J. Koch

    2006-05-15

    The status of groundwater level monitoring at Los Alamos National Laboratory (LANL) in 2005 is provided in this report. The Groundwater Level Monitoring Project was instituted in 2005 to provide a framework for the collection and processing of quality controlled groundwater level data. This report summarizes groundwater level data for 137 monitoring wells, including 41 regional aquifer wells, 22 intermediate wells, and 74 alluvial wells. Pressure transducers were installed in 118 monitoring wells for continuous monitoring of groundwater levels. Time-series hydrographs of groundwater level data are presented along with pertinent construction and location information for each well.

  16. ACRF Ingest Software Status: New, Current, and Future - June 2008

    SciTech Connect (OSTI)

    AS Koontz; S Choudhury; BD Ermold; NN Keck; KL Gaustad; RC Perez

    2008-06-01

    The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF). The report is divided into 4 sections: (1) for news about ingests currently under development, (2) for current production ingests, (3) for future ingest development plans, and (4) for information on retired ingests. Please note that datastreams beginning in “xxx” indicate cases where ingests run at multiple ACRF sites, which results in a datastream(s) for each location.

  17. ACRF Ingest Software Status: New, Current, and Future - May 2008

    SciTech Connect (OSTI)

    AS Koontz; S Choudhury; BD Ermold; N N Keck; KL Gaustad; RC Perez

    2008-05-01

    The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement Program Climate Research Facility (ACRF). The report is divided into 4 sections: (1) for news about ingests currently under development, (2) for current production ingests, (3) for future ingest development plans, and (4) for information on retired ingests. Please note that datastreams beginning in “xxx” indicate cases where ingests run at multiple ACRF sites, which results in a datastream(s) for each location.

  18. ACRF Ingest Software Status: New, Current, and Future - April 2008

    SciTech Connect (OSTI)

    AS Koontz; S Choudhury; BD Ermold; NN Keck; KL Gaustad; RC Perez

    2008-04-01

    The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement Program Climate Research Facility (ACRF). The report is divided into 4 sections: (1) for news about ingests currently under development, (2) for current production ingests, (3) for future ingest development plans, and (4) for information on retired ingests. Please note that datastreams beginning in “xxx” indicate cases where ingests run at multiple ACRF sites, which results in a datastream(s) for each location.

  19. Webinar: National Hydrogen Learning Demonstration Status

    Broader source: Energy.gov [DOE]

    Video recording and text version of the webinar, "National Hydrogen Learning Demonstration Status," originally presented on February 6, 2012.

  20. Transit Infrastructure Finance Through Station Location Auctions

    E-Print Network [OSTI]

    Ian Carlton

    2009-01-01

    the transit operations and capital costs for various stationwill help yield greater capital cost coverage than they

  1. Radiation damage in the LHCb Vertex Locator

    E-Print Network [OSTI]

    A. Affolder; K. Akiba; M. Alexander; S. Ali; M. Artuso; J. Benton; M. van Beuzekom; P. M. Bj\\ornstad; G. Bogdanova; S. Borghi; T. J. V. Bowcock; H. Brown; J. Buytaert; G. Casse; P. Collins; S. De Capua; D. Dossett; L. Eklund; C. Farinelli; J. Garofoli; M. Gersabeck; T. Gershon; H. Gordon; J. Harrison; V. Heijne; K. Hennessy; D. Hutchcroft; E. Jans; M. John; T. Ketel; G. Lafferty; T. Latham; A. Leflat; M. Liles; D. Moran; I. Mous; A. Oblakowska-Mucha; C. Parkes; G. D. Patel; S. Redford; M. M. Reid; K. Rinnert; E. Rodrigues; M. Schiller; T. Szumlak; C. Thomas; J. Velthuis; V. Volkov; A. D. Webber; M. Whitehead; E. Zverev

    2013-02-21

    The LHCb Vertex Locator (VELO) is a silicon strip detector designed to reconstruct charged particle trajectories and vertices produced at the LHCb interaction region. During the first two years of data collection, the 84 VELO sensors have been exposed to a range of fluences up to a maximum value of approximately $\\rm{45 \\times 10^{12}\\,1\\,MeV}$ neutron equivalent ($\\rm{1\\,MeV\\,n_{eq}}$). At the operational sensor temperature of approximately $-7\\,^{\\circ}\\rm{C}$, the average rate of sensor current increase is $18\\,\\upmu\\rm{A}$ per $\\rm{fb^{-1}}$, in excellent agreement with predictions. The silicon effective bandgap has been determined using current versus temperature scan data after irradiation, with an average value of $E_{g}=1.16\\pm0.03\\pm0.04\\,\\rm{eV}$ obtained. The first observation of n-on-n sensor type inversion at the LHC has been made, occurring at a fluence of around $15 \\times 10 ^{12}$ of $1\\,\\rm{MeV\\,n_{eq}}$. The only n-on-p sensors in use at the LHC have also been studied. With an initial fluence of approximately $\\rm{3 \\times 10^{12}\\,1\\,MeV\\,n_{eq}}$, a decrease in the Effective Depletion Voltage (EDV) of around 25\\,V is observed, attributed to oxygen induced removal of boron interstitial sites. Following this initial decrease, the EDV increases at a comparable rate to the type inverted n-on-n type sensors, with rates of $(1.43\\pm 0.16) \\times 10 ^{-12}\\,\\rm{V} / \\, 1 \\, \\rm{MeV\\,n_{eq}}$ and $(1.35\\pm 0.25) \\times 10 ^{-12}\\,\\rm{V} / \\, 1 \\, \\rm{MeV\\,n_{eq}}$ measured for n-on-p and n-on-n type sensors, respectively. A reduction in the charge collection efficiency due to an unexpected effect involving the second metal layer readout lines is observed.

  2. The Construction of Locative Situations: Locative Media and the Situationist International, Recuperation or Redux?

    E-Print Network [OSTI]

    McGarrigle, Conor

    2009-01-01

    closely aligned to the SI's construction of situations. ThisG (1957) Report on the Construction of Situations and on theThe Construction of Locative Situations: Locative Media and

  3. Annual Hanford Site environmental permitting status report

    SciTech Connect (OSTI)

    Sonnichsen, J.C.

    1998-09-17

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

  4. Method of locating underground mines fires

    DOE Patents [OSTI]

    Laage, Linneas (Eagam, MN); Pomroy, William (St. Paul, MN)

    1992-01-01

    An improved method of locating an underground mine fire by comparing the pattern of measured combustion product arrival times at detector locations with a real time computer-generated array of simulated patterns. A number of electronic fire detection devices are linked thru telemetry to a control station on the surface. The mine's ventilation is modeled on a digital computer using network analysis software. The time reguired to locate a fire consists of the time required to model the mines' ventilation, generate the arrival time array, scan the array, and to match measured arrival time patterns to the simulated patterns.

  5. Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

    SciTech Connect (OSTI)

    Gregory Weatherby

    2012-05-01

    The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

  6. Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy s National Nuclear Security Administration under contract DE-AC04-94AL85000.

    E-Print Network [OSTI]

    Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company85000. Status of Z-Pinch ICF ResearchStatus of Z-Pinch ICF Research Fusion Power Associates Meeting

  7. Earthquake Location, Direct, Global-Search Methods E 2449 Earthquake Location,

    E-Print Network [OSTI]

    Earthquake Location, Direct, Global-Search Methods E 2449 Earthquake Location, Direct, Global Kingdom Article Outline Glossary Definition of the Subject Introduction The Earthquake Location Problem or temporal av- erage of some characteristic of an earthquake, such as surface shaking intensity or moment

  8. SuperNEMO Project Status

    SciTech Connect (OSTI)

    Chauveau, E. [Universite de Bordeaux, Centre d'Etudes Nucleaires de Bordeaux Gradignan, UMR 5797, F-33175 Gradignan (France) and CNRS/IN2P3, Centre d'Etudes Nucleaires de Bordeaux Gradignan, UMR 5797, F-33175 Gradignan (France)

    2009-11-09

    The SuperNEMO experiment aims to reach a sensitivity up to 10{sup 26} years on the half-life of neutrinoless double beta decay. The chosen way is to build a 'tracko-calo' detector with at least 100 kg of betabeta isotope. The current status of the main R and D tasks will be presented: enrichment and production of source foil, radiopurity control, tracker and calorimeter.

  9. Addressing endogeneity in residential location models

    E-Print Network [OSTI]

    Guevara-Cue, Cristián Angelo

    2005-01-01

    Some empirical residential location choice models have reported dwelling-unit price estimated parameters that are small, not statistically significant, or even positive. This would imply that households are non-sensitive ...

  10. Techniques for Mobile Location Estimation in UMTS 

    E-Print Network [OSTI]

    Thomas, Nicholas J

    The subject area of this thesis is the locating of mobile users using the future 3rd generation spread spectrum communication system UMTS. The motivation behind this work is twofold: firstly the United States Federal ...

  11. A Survey on the Warehouse Location Problem

    E-Print Network [OSTI]

    Cohen, Joseph J.

    The warehouse location problem has assumed numerous formulations, and solutions have been devised using a variety of mathematical techniques. The development of this effort is examined and relevant models presented for evaluation.

  12. Developing a theory of nightclub location choice

    E-Print Network [OSTI]

    Crim, Stephen J. (Stephen Johnson)

    2008-01-01

    This work is an investigation of the factors that influence where nightclubs locate within a city. Nightclubs, like other social spaces, provide important social and economic benefits in the urban environment. As amenities, ...

  13. Alternative Fuel Infrastructure Associate Location: San Diego

    E-Print Network [OSTI]

    California at Davis, University of

    Alternative Fuel Infrastructure Associate Location: San Diego Basic Functions Center an Alternative Fuel Infrastructure Associate that has a passion for sustainability, the environment, and accelerating the transition to a sustainable world powered by clean energy! The Alternative Fuel Infrastructure

  14. Driver expectancy in locating automotive controls 

    E-Print Network [OSTI]

    Francis, Dawn Suzette

    1990-01-01

    DRIVER EXPECTANCY IN LOCATING AUTOMOTIVE CONTROLS A Thesis by DAWN SUZETTE FRANCIS Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May 1990... Major Subject: Industrial Engineering DRIVER EXPECTANCY IN LOCATING AUTOMOTIVE CONTROLS A Thesis by DAWN SUZETTE FRANCIS Approved as to style and content by: R. Dale Huchi son (Chair of Committee) Rodger . . ppa (Member) Waymon L ohnston (M er...

  15. A VIRTUAL OPERATING SYSTEM

    E-Print Network [OSTI]

    Hall, Dennis E.

    2013-01-01

    Unix time-sharing operating system. D. Hall, D. Scherrer, J.Prentice~Hall, Hansen, "Operating System Principles", Inc. ,of California. A Virtual Operating System Dennis E. Hall

  16. Formal Specification of Operating System Operations

    E-Print Network [OSTI]

    Black, Paul E.

    Formal Specification of Operating System Operations Dan Zhou Department of Computer Science.black@nist.gov This paper describes the development of a formal specification for a secure operating system architecture operations. We also provide a uniform environment for system commands that change the security state

  17. www.elsevier.com/locate/pnucene Progress in Nuclear Energy, Vol. 43, No. I-4, pp. 35-41,2003

    E-Print Network [OSTI]

    Pázsit, Imre

    Pergamon www.elsevier.com/locate/pnucene Progress in Nuclear Energy, Vol. 43, No. I-4, pp. 35 at operating plant. Some new methods have been included into the routine monitoring system of the plant. 35 #12

  18. Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effect Photovoltaics -7541C.3X-rays IlluminateStateIntentchange. (Technical Report)9

  19. Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effect Photovoltaics -7541C.3X-rays IlluminateStateIntentchange. (Technical

  20. Study on the relationship between left-turn traffic operations and safety at signalized intersections 

    E-Print Network [OSTI]

    Lee, Sunghoon

    2009-06-02

    Intersections are the most complex locations in a traffic system and are likely to have a higher crash count than any other location in the system. Intersection safety is related to traffic operations, such as traffic signal and approaching volume...

  1. Status of the AMS Experiment

    E-Print Network [OSTI]

    Kounine, A

    2010-01-01

    Alpha Magnetic Spectrometer (AMS-02) is a general purpose high energy particle detector which will be deployed on the International Space Station (ISS) at the end of 2010 - beginning of 2011 to conduct a unique 10 to 18 year mission of fundamental physics research in space. Among the physics objectives of AMS are a search for an understanding of Dark Matter, Antimatter, the origin of cosmic rays and the exploration of new physics phenomena not possible to study from ground based experiments. This article reviews the status of the AMS-02 detector construction, detector calibration results as well as AMS physics potential for new phenomena searches.

  2. Status of Charm Flavor Physics

    E-Print Network [OSTI]

    I. Shipsey

    2006-07-26

    The role of charm in testing the Standard Model description of quark mixing and CP violation through measurements of lifetimes, decay constants and semileptonic form factors is reviewed. Together with Lattice QCD, charm has the potential this decade to maximize the sensitivity of the entire flavor physics program to new physics. and pave the way for understanding physics beyond the Standard Model at the LHC in the coming decade. The status of indirect searches for physics beyond the Standard Model through charm mixing, CP-violation and rare decays is also reported.

  3. Development Status of the ILC Marx Modulator

    SciTech Connect (OSTI)

    Nguyen, M.; Beukers, T.; Burkhart, C.; Larsen, R.; Olsen, J.; Tang, T.; /SLAC

    2008-06-16

    The ILC Marx Modulator is under development as a lower cost alternative to the 'Baseline Conceptual Design' (BCD) klystron modulator. Construction of a prototype Marx is complete and testing is underway at SLAC. The Marx employs solid state elements, IGBTs and diodes, to control the charge, discharge and isolation of the modules. The prototype is based on a stack of sixteen modules, each initially charged to {approx}11 kV, which are arranged in a Marx topology. Initially, eleven modules combine to produce the 120 kV output pulse. The remaining modules are switched in after appropriate delays to compensate for the voltage droop that results from the discharge of the energy storage capacitors. Additional elements will further regulate the output voltage to {+-} 0.5%. The Marx presents several advantages over the conventional klystron modulator designs. It is physically smaller; there is no pulse transformer (quite massive at these parameters) and the energy storage capacitor bank is quite small, owing to the active droop compensation. It is oil-free; voltage hold-off is achieved using air insulation. It is air cooled; the secondary air-water heat exchanger is physically isolated from the electronic components. This paper outlines the current developmental status of the prototype Marx. It presents a detailed electrical and mechanical description of the modulator and operational test results. It will discuss electrical efficiency measurements, fault testing, and output voltage regulation.

  4. Development Status of The ILC Marx Modulator

    SciTech Connect (OSTI)

    Nguyen, M; Beukers, T.; Burkhart, C.; Larsen, R.; Olsen, J.; Tang, T.; /SLAC; ,

    2010-06-07

    The ILC Marx Modulator is under development as a lower cost alternative to the 'Baseline Conceptual Design' (BCD) klystron modulator. Construction of a prototype Marx is complete and testing is underway at SLAC. The Marx employs solid state elements, IGBTs and diodes, to control the charge, discharge and isolation of the modules. The prototype is based on a stack of sixteen modules, each initially charged to {approx}11 kV, which are arranged in a Marx topology. Initially, eleven modules combine to produce the 120 kV output pulse. The remaining modules are switched in after appropriate delays to compensate for the voltage droop that results from the discharge of the energy storage capacitors. Additional elements will further regulate the output voltage to {+-}0.5%. The Marx presents several advantages over the conventional klystron modulator designs. It is physically smaller; there is no pulse transformer (quite massive at these parameters) and the energy storage capacitor bank is quite small, owing to the active droop compensation. It is oil-free; voltage hold-off is achieved using air insulation. It is air cooled; the secondary air-water heat exchanger is physically isolated from the electronic components. This paper outlines the current developmental status of the prototype Marx. It presents a detailed electrical and mechanical description of the modulator and operational test results. It will discuss electrical efficiency measurements, fault testing, and output voltage regulation.

  5. Design and operational considerations of United States commercial near-surface low-level radioactive waste disposal facilities

    SciTech Connect (OSTI)

    Birk, S.M.

    1997-10-01

    In accordance with the Low-Level Radioactive Waste Policy Amendments Act of 1985, states are responsible for providing for disposal of commercially generated low-level radioactive waste (LLW) within their borders. LLW in the US is defined as all radioactive waste that is not classified as spent nuclear fuel, high-level radioactive waste, transuranic waste, or by-product material resulting from the extraction of uranium from ore. Commercial waste includes LLW generated by hospitals, universities, industry, pharmaceutical companies, and power utilities. LLW generated by the country`s defense operations is the responsibility of the Federal government and its agency, the Department of Energy. The commercial LLRW disposal sites discussed in this report are located near: Sheffield, Illinois (closed); Maxey Flats, Kentucky (closed); Beatty, Nevada (closed); West Valley, New York (closed); Barnwell, South Carolina (operating); Richland, Washington (operating); Ward Valley, California, (proposed); Sierra Blanca, Texas (proposed); Wake County, North Carolina (proposed); and Boyd County, Nebraska (proposed). While some comparisons between the sites described in this report are appropriate, this must be done with caution. In addition to differences in climate and geology between sites, LLW facilities in the past were not designed and operated to today`s standards. This report summarizes each site`s design and operational considerations for near-surface disposal of low-level radioactive waste. The report includes: a description of waste characteristics; design and operational features; post closure measures and plans; cost and duration of site characterization, construction, and operation; recent related R and D activities for LLW treatment and disposal; and the status of the LLW system in the US.

  6. Fuel Cell Buses in U.S. Transit Fleets: Current Status 2010

    SciTech Connect (OSTI)

    Eudy, L.; Chandler, K.; Gigakis, C.

    2010-11-01

    This status report, fourth in a series of annual status reports from the U.S. Department of Energy's National Renewable Energy Laboratory, summarizes progress and accomplishments from demonstrations of fuel cell transit buses in the United States. This year's assessment report provides the results from the fifth year of operation of five Van Hool, ISE, and UTC Power fuel cell buses operating at AC Transit, SunLine, and CTTRANSIT. The achievements and challenges of this bus design, implementation, and operating are presented, with a focus on the next steps for implementing larger numbers and new and different designs of fuel cell buses. The major positive result from nearly five years of operation is the dramatic increase in reliability experienced for the fuel cell power system.

  7. Location theory and the location of industry along an interstate highway 

    E-Print Network [OSTI]

    Miller, James Patterson

    1965-01-01

    a greater gamble. This sect. ion has been devoted to s review of the fundamental factors underlying all plant location ss recognised in location theory. The next section will review some recent. empirical attempts to determine the actual... for this thesis was possible through the assistance provided )ointly by the Texas Highway Department and the Bureau of Public Roads. i. v TABLE OF CONTENTS Chapter Page INTRODUCTION Purpose Plan of Study REVIEW OF PLANT LOCATION CONCEPTS Introduction...

  8. Utility Locating in the DOE Environment

    SciTech Connect (OSTI)

    Clark Scott; Gail Heath

    2006-04-01

    Some advances have been made in utility locating in recent years and standards have been recently published to try and categorize the level of information known about the utility in the subsurface. At the same time some characterization about the level of effort or technology in the geophysicist approach to utility locating may be generalized. The DOE environment poses some added difficulties and this presentation covers these issues, costs and the technical approach that has been developed at the INEEL to prevent utility hits and how it fits into the generalized classification of effort.

  9. Eliminating the Effects of a Status Characteristic 

    E-Print Network [OSTI]

    Freese, Lee; Cohen, Bernard P

    2015-08-12

    ), and from the aggregation function proposed in the developing theory of status characteristics and expectation states (Berger et al. 1974; 1977)....

  10. Status of State Electric Industry Restructuring Activity

    Reports and Publications (EIA)

    2010-01-01

    Presents an overview of the status of electric industry restructuring in each state. Restructuring means that a monopoly system of electric utilities has been replaced with competing sellers.

  11. Molecular catalytic coal liquid conversion. Quarterly status...

    Office of Scientific and Technical Information (OSTI)

    report Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly status report In this Quarter, the research was focused continually on the...

  12. Molecular catalytic coal liquid conversion. Quarterly status...

    Office of Scientific and Technical Information (OSTI)

    July--September 1995 Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly status report, July--September 1995 The research was...

  13. Molecular catalytic coal liquid conversion. Quarterly status...

    Office of Scientific and Technical Information (OSTI)

    July--September 1995 Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly status report, July--September 1995 You are accessing...

  14. Molecular catalytic coal liquid conversion. Quarterly status...

    Office of Scientific and Technical Information (OSTI)

    report Citation Details In-Document Search Title: Molecular catalytic coal liquid conversion. Quarterly status report You are accessing a document from the Department of...

  15. Nuclear safeguards research and development. Program status report, October 1980-January 1981

    SciTech Connect (OSTI)

    Henry, C.N.

    1981-11-01

    This report presents the status of the Nuclear Safeguards Research and Development Program pursued by the Energy, Chemistry-Materials Science, and Operational Security/Safeguards Divisions of the Los Alamos National Laboratory. Topics include nondestructive assay technology development and applications, international safeguards systems. Also discussed are training courses, technology transfer, analytical chemistry methods for fissionable materials safeguards, the Department of Energy Computer Security Technical Center, and operational security.

  16. Present Status of the 7 10 m Telescope of CANGAROO II

    E-Print Network [OSTI]

    mirrors of 80 cm in diameter. The Carbon Fiber Reinforced Plastic CFRP is used for the main material will start operation in 1999 in Woomera, South Australia, with a 7 m aperture using 60 plastic mirrors note here that our challenge is in the plastic mirrors and the mirror tuning system. 2 Status

  17. ENERGY-SPECIFIC SOLAR RADIATION DATA FROM MSG: CURRENT STATUS OF THE HELIOSAT-3 PROJECT

    E-Print Network [OSTI]

    Heinemann, Detlev

    ENERGY-SPECIFIC SOLAR RADIATION DATA FROM MSG: CURRENT STATUS OF THE HELIOSAT-3 PROJECT Marion Solar energy technologies such as photovoltaics, solar thermal power plants, passive solar heating and operating of solar energy systems and as basis data set for electricity load forecasting. Both long term

  18. E.S. Rubin, Carnegie Mellon The Status and Future of

    E-Print Network [OSTI]

    strategy · CCS also can help decarbonize the transportation sector via lowcarbon electricity and hydrogen. 7% no nuke, 6% limited wind and solar; 64% limited bioenergy. E.S. Rubin, Carnegie Mellon A Brief, Carnegie Mellon Status of CCS Technology · Globally: 22 projects operating or u/c ­ Xx power plants; yy

  19. 3-1 1999 SITE ENVIRONMENTAL REPORT CHAPTER 3: COMPLIANCE STATUS

    E-Print Network [OSTI]

    3-1 1999 SITE ENVIRONMENTAL REPORT CHAPTER 3: COMPLIANCE STATUS Brookhaven National Laboratory-specific permits. In 1999 BNL operated in compliance with the vast majority of these regulations, and programs products were detected in groundwater at the Major Petroleum Facility. External audits in 1999 included

  20. HISTORY AND CURRENT STATUS OF THE CIMEL SUN-PHOTOMETERS AT ACRF SITES

    E-Print Network [OSTI]

    HISTORY AND CURRENT STATUS OF THE CIMEL SUN-PHOTOMETERS AT ACRF SITES L. Gregory and R. Wagener operational revisions: (1) adding serial line data collection and internet transfer, and (2) adding the zenith-pointing cloud mode. We review the time-line and history of these changes and describe plans for adding

  1. Sustainable Transportation Fellowship Location: San Diego, CA

    E-Print Network [OSTI]

    California at Davis, University of

    Sustainable Transportation Fellowship Location: San Diego, CA Our clean energy future depends. · Regular web posts on other clean transportation topics. · Assist in other tasks, as assigned. The ideal and a clean, healthy environment. To bring about such a future, each of us must make wise choices now

  2. Secure Location Verification Using Radio Broadcast

    E-Print Network [OSTI]

    Nesterenko, Mikhail

    , exploits the difference between propagation speeds of radio and sound waves to estimate the position1 Secure Location Verification Using Radio Broadcast Adnan Vora and Mikhail Nesterenko Abstract of the prover. In this paper, we propose a solution that leverages the broadcast nature of the radio signal

  3. Secure Location Verification Using Radio Broadcast

    E-Print Network [OSTI]

    Nesterenko, Mikhail

    the difference between propagation speeds of radio and sound waves to estimate the position of the proverSecure Location Verification Using Radio Broadcast Adnan Vora and Mikhail Nesterenko Computer. In this paper, we propose a solution that leverages the broadcast nature of the radio signal emitted

  4. OPTIMAL LOCATION OF ISOLATION VALVES IN WATER

    E-Print Network [OSTI]

    Mays, Larry W.

    CHAPTER 7 OPTIMAL LOCATION OF ISOLATION VALVES IN WATER DISTRIBUTION SYSTEMS: A RELIABILITY The cornerstone of any healthy population is access to safe drinking water. The goal of the United Nations International Drinking Water Supply and Sanitation Decade from 1981 to 1990 was safe drinking water for all

  5. Ontology-based Disambiguation of Spatiotemporal Locations

    E-Print Network [OSTI]

    Hyvönen, Eero

    , in the semantic portal MuseumFinland3 [7] a location parton- omy4 was used for annotating museum artifacts. #12;A problem when creating a semantic cultural heritage portal is that places, both modernFinland originate from regions that no longer exist and/or are not part of Finland but of Russia with new names

  6. Locating Secret Messages in Images Ian Davidson

    E-Print Network [OSTI]

    Davidson, Ian

    Locating Secret Messages in Images Ian Davidson Computer Science, SUNY Albany 1400 Washington in innocuous media such as images, while steganalysis is the field of detecting these secret messages contributing the most to the energy calculations of an image are deemed outliers. Typically, of the top third

  7. www.elsevier.com/locate/visres polarization

    E-Print Network [OSTI]

    Boal, Jean

    .elsevier.com/locate/visres Cuttlefish use polarization sensitivity in predation on silvery fish Nadav Shashar a,b, Roland Hagan c, Jean of cuttlefish, we examined the preference of Sepia officina/is when presented with fish whose polarization reflection was greatly reduced versus fish whose polarization reflection was not affected. Cuttlefish preyed

  8. Fuel Cell Technology Status Analysis Project: Partnership Opportunities (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-06-01

    This fact sheet describes National Renewable Energy Laboratory's (NREL's) Fuel Cell Technology Status Analysis Project. NREL is seeking fuel cell industry partners from the United States and abroad to participate in an objective and credible analysis of commercially available fuel cell products to benchmark the current state of the technology and support industry growth. Participating fuel cell developers share price information about their fuel cell products and/or raw fuel cell test data related to operations, maintenance, and safety with NREL via the Hydrogen Secure Data Center (HSDC). The limited-access, off-network HSDC houses the data and analysis tools to protect proprietary information. NREL shares individualized data analysis results as detailed data products (DDPs) with the partners who supplied the data. Aggregated results are published as composite data products (CDPs), which show the technology status without identifying individual companies. The CDPs are a primary benchmarking tool for the U.S. Department of Energy and other stakeholders interested in tracking the status of fuel cell technologies. They highlight durability advancements, identify areas for continued development, and help set realistic price expectations at small-volume production.

  9. Standard Operating Procedure (SOP) Drill Press

    E-Print Network [OSTI]

    Veiga, Pedro Manuel Barbosa

    Standard Operating Procedure (SOP) ­ Drill Press · Know the location of start and stop switches or buttons and keep the drill press table free of tools and other materials. · Use only properly sharpened while the drill press is in motion. · Do not insert a drill chuck key into the chuck until the power

  10. Safe Operating Procedure (Revised 10/11)

    E-Print Network [OSTI]

    Tsymbal, Evgeny Y.

    ://ehs.unl.edu/) Scope This SOP applies to those UNL locations where oils are stored in containers or tanks that are 55 employees who have responsibilities related to oil storage (herein referred to as operations personnel) with guidance on minimizing the potential for oil spills and releases through effective planning, preparation

  11. Light Board Operation 208 Jordan Hall

    E-Print Network [OSTI]

    Buechler, Steven

    Light Board Operation 208 Jordan Hall Using the Light Board 1. Turn on the lights next to the entry door. 2. Turn on the Light Board lights (illustration 1). The light switch is on the west wall, slightly behind the computer cart's display. 3. Locate the lapel microphone (usually on top of the Light

  12. Certifications http://OperationsExcellence.utk.edu

    E-Print Network [OSTI]

    Grissino-Mayer, Henri D.

    Certifications http://OperationsExcellence.utk.edu Green, Black, Lean Six Sigma, and Master Black) Lean (one week of coursework) 2) Lean Six Sigma (two weeks of coursework) 3) Six Sigma (two weeks) lean Six Sigma Green Belt coursework: Location: Knoxville, Tennessee Tuition: $4,500 (5 days) or $3

  13. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    that described radiological upsets in the facility (dates, locations and contamination values). " Work packages and associated radiological screening forms,...

  14. Hardware Memo - Input Multiplexer Status

    E-Print Network [OSTI]

    Noftsker, Russell

    1966-10-01

    Note: Computer control of Input Multiplexer and Output Sample and Hold is available when clock and test switches on the I/O box are in "Computer Input" and "Computer Output" positions, respectively. Manual operation of the ...

  15. Local Monitoring and Maintenance for Operational Wireless Sensor Networks

    E-Print Network [OSTI]

    Wu, Jie

    a wireless sensor network (WSN) is to monitor the network itself. Many ex- isting approaches perform centralized analysis and maintenance based on a large amount of status reports collected from the WSN, while the normal operations of targeted WSN applications. Unlike existing work, we propose LoMoM, a new approach

  16. Request for Information: Operation of Regional Test Center Test Bed Located

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnowRedoxRelatedFraudMonitoringDepartmentat

  17. A Peer-to-Peer Spatial Cloaking Algorithm for Anonymous Location-based Services

    E-Print Network [OSTI]

    Mokbel, Mohamed F.

    of services than the proactive mode, but the on-demand incurs longer response time. Categories and Subject providers, reporting private location in- formation may lead to several privacy threats. In this pa- per, we the entire group of peers. Two modes of operations are supported within the proposed P2P spa- tial cloaking

  18. Energy Procedia 00 (2010) 000000 www.elsevier.com/locate/XXX

    E-Print Network [OSTI]

    2010-01-01

    , 91058 Erlangen, Germany. c MIT Energy Initiative, Massachusetts Institute of Technology, 77Energy Procedia Energy Procedia 00 (2010) 000­000 www.elsevier.com/locate/XXX Available online, the total operational and capital costs resulting from the high energy consumption are prohibitive

  19. Neutrino oscillations: present status and outlook

    E-Print Network [OSTI]

    Thomas Schwetz

    2007-10-26

    I summarize the status of three-flavour neutrino oscillations with date of Oct. 2007, and provide an outlook for the developments to be expected in the near future. Furthermore, I discuss the status of sterile neutrino oscillation interpretations of the LSND anomaly in the light of recent MiniBooNE results, and comment on implications for the future neutrino oscillation program.

  20. MFR PAPER 1327 Status and Problems of

    E-Print Network [OSTI]

    MFR PAPER 1327 Status and Problems of the American Shrimp Industry ROGER W. HUTCHINSON ABSTRACT-The shrimp industry of the United States enjoyed 2 successful years in 1976 and 1977 and expectations industry plus a brief description of various problems facing it. INTRODUCTION The status and problems

  1. NUCLEAR POWER IN CALIFORNIA: 2007 STATUS REPORT

    E-Print Network [OSTI]

    NUCLEAR POWER IN CALIFORNIA: 2007 STATUS REPORT Prepared For: California Energy Commission Prepared;Abstract This consultant report examines how nuclear power issues have evolved since publication of the consultant report, Nuclear Power in California: Status Report, which was prepared for the 2005 IEPR

  2. Nuclear power plant status diagnostics using artificial neural networks

    SciTech Connect (OSTI)

    Bartlett, E.B. [Iowa State Univ. of Science and Technology, Ames, IA (United States). Dept. of Mechanical Engineering] [Iowa State Univ. of Science and Technology, Ames, IA (United States). Dept. of Mechanical Engineering; Uhrig, R.E. [Tennessee Univ., Knoxville, TN (United States). Dept. of Nuclear Engineering] [Tennessee Univ., Knoxville, TN (United States). Dept. of Nuclear Engineering

    1991-12-31

    In this work, the nuclear power plant operating status recognition issue is investigated using artificial neural networks (ANNs). The objective is to train an ANN to classify nuclear power plant accident conditions and to assess the potential of future work in the area of plant diagnostics with ANNS. To this end, an ANN was trained to recognize normal operating conditions as well as potentially unsafe conditions based on nuclear power plant training simulator generated accident scenarios. These scenarios include; hot and cold leg loss of coolant, control rod ejection, loss of offsite power, main steam line break, main feedwater line break and steam generator tube leak accidents. Findings show that ANNs can be used to diagnose and classify nuclear power plant conditions with good results.

  3. Nuclear power plant status diagnostics using artificial neural networks

    SciTech Connect (OSTI)

    Bartlett, E.B. (Iowa State Univ. of Science and Technology, Ames, IA (United States). Dept. of Mechanical Engineering); Uhrig, R.E. (Tennessee Univ., Knoxville, TN (United States). Dept. of Nuclear Engineering)

    1991-01-01

    In this work, the nuclear power plant operating status recognition issue is investigated using artificial neural networks (ANNs). The objective is to train an ANN to classify nuclear power plant accident conditions and to assess the potential of future work in the area of plant diagnostics with ANNS. To this end, an ANN was trained to recognize normal operating conditions as well as potentially unsafe conditions based on nuclear power plant training simulator generated accident scenarios. These scenarios include; hot and cold leg loss of coolant, control rod ejection, loss of offsite power, main steam line break, main feedwater line break and steam generator tube leak accidents. Findings show that ANNs can be used to diagnose and classify nuclear power plant conditions with good results.

  4. Location deterministic biosensing from quantum-dot-nanowire assemblies

    SciTech Connect (OSTI)

    Liu, Chao [Materials Science and Engineering Program, Texas Materials Institute, University of Texas at Austin, Austin, Texas 78712 (United States); Kim, Kwanoh [Department of Mechanical Engineering, University of Texas at Austin, Austin, Texas 78712 (United States); Fan, D. L., E-mail: dfan@austin.utexas.edu [Materials Science and Engineering Program, Texas Materials Institute, University of Texas at Austin, Austin, Texas 78712 (United States); Department of Mechanical Engineering, University of Texas at Austin, Austin, Texas 78712 (United States)

    2014-08-25

    Semiconductor quantum dots (QDs) with high fluorescent brightness, stability, and tunable sizes, have received considerable interest for imaging, sensing, and delivery of biomolecules. In this research, we demonstrate location deterministic biochemical detection from arrays of QD-nanowire hybrid assemblies. QDs with diameters less than 10?nm are manipulated and precisely positioned on the tips of the assembled Gold (Au) nanowires. The manipulation mechanisms are quantitatively understood as the synergetic effects of dielectrophoretic (DEP) and alternating current electroosmosis (ACEO) due to AC electric fields. The QD-nanowire hybrid sensors operate uniquely by concentrating bioanalytes to QDs on the tips of nanowires before detection, offering much enhanced efficiency and sensitivity, in addition to the position-predictable rationality. This research could result in advances in QD-based biomedical detection and inspires an innovative approach for fabricating various QD-based nanodevices.

  5. The role of SCADA in developing a lean enterprise for municipal wastewater operations

    E-Print Network [OSTI]

    Prutz, Stanley J

    2005-01-01

    Central to optimizing a wastewater system's operations is the collection of alarm and operational data from various remote locations throughout a municipality, hence the basic need for supervisory control and data acquisition ...

  6. Mobile Homophily and Social Location Prediction

    E-Print Network [OSTI]

    Bapierre, Halgurt; Groh, Georg

    2015-01-01

    The mobility behavior of human beings is predictable to a varying degree e.g. depending on the traits of their personality such as the trait extraversion - introversion: the mobility of introvert users may be more dominated by routines and habitual movement patterns, resulting in a more predictable mobility behavior on the basis of their own location history while, in contrast, extrovert users get about a lot and are explorative by nature, which may hamper the prediction of their mobility. However, socially more active and extrovert users meet more people and share information, experiences, believes, thoughts etc. with others. which in turn leads to a high interdependency between their mobility and social lives. Using a large LBSN dataset, his paper investigates the interdependency between human mobility and social proximity, the influence of social networks on enhancing location prediction of an individual and the transmission of social trends/influences within social networks.

  7. VCSEL fault location apparatus and method

    DOE Patents [OSTI]

    Keeler, Gordon A. (Albuquerque, NM); Serkland, Darwin K. (Albuquerque, NM)

    2007-05-15

    An apparatus for locating a fault within an optical fiber is disclosed. The apparatus, which can be formed as a part of a fiber-optic transmitter or as a stand-alone instrument, utilizes a vertical-cavity surface-emitting laser (VCSEL) to generate a test pulse of light which is coupled into an optical fiber under test. The VCSEL is subsequently reconfigured by changing a bias voltage thereto and is used as a resonant-cavity photodetector (RCPD) to detect a portion of the test light pulse which is reflected or scattered from any fault within the optical fiber. A time interval .DELTA.t between an instant in time when the test light pulse is generated and the time the reflected or scattered portion is detected can then be used to determine the location of the fault within the optical fiber.

  8. Menstrual cycle effects on spatial location tasks 

    E-Print Network [OSTI]

    Andrew, Sarah

    2013-02-22

    abilities (Halpem, 1992; Voyer et al. , 1995). However, there is one spatial ability test where women demonstrate an advantage over men. This female advantage spatial ability is known as spaflal location memory (Eals & Silvermen, 1994; Silverman & Eals..., Mock & Erbaugh, 1961) and a brief daily diary, which recorded subjective moods (i. e. , anxiety, sadness, anger, happiness, and energy level). The participants recorded their daily moods in the daily diary by marking a spot on a 10 cm visual analogue...

  9. Alternative Fueling Station Locator | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematics And StatisticsProgram ManagerCorridor Designations in 11Alternative Fueling Station Locator

  10. Location of Narrowband Spikes in Solar Flares

    E-Print Network [OSTI]

    Arnold O. Benz; Pascal Saint-Hilaire; Nicole Vilmer

    2001-12-19

    Narrowband spikes of the decimeter type have been identified in dynamic spectrograms of Phoenix-2 of ETH Zurich and located in position with the Nancay Radioheliograph at the same frequency. The spike positions have been compared with the location of hard X-ray emission and the thermal flare plasma in soft X-rays and EUV lines. The decimetric spikes are found to be single sources located some 20" to 400" away from the flare site in hard or soft X-rays. In most cases there is no bright footpoint nearby. In at least two cases the spikes are near loop tops. These observations do not confirm the widely held view that the spike emission is produced by some loss-cone instability masering near the footpoints of flare loops. On the other hand, the large distance to the flare sites and the fact that these spikes are all observed in the flare decay phase make the analyzed spike sources questionable sites for the main flare electron acceleration. They possibly indicate coronal post-flare acceleration sites.

  11. Semantics of Functional and Locative Relations in Rongga

    E-Print Network [OSTI]

    Aryawibawa, I. Nyoman

    2010-01-01

    Many scholars have proposed a universal set of locative relations. Herskovits’s comprehensive study of English locative relations found that locative concepts such as inclusion, support and contiguity, and coincidence are basic in English. Her...

  12. Location Prediction in Social Media Based on Tie Strength 

    E-Print Network [OSTI]

    McGee, Jeffrey A

    2013-04-29

    We propose a novel network-based approach for location estimation in social media that integrates evidence of the social tie strength between users for improved location estimation. Concretely, we propose a location estimator – Friendly...

  13. Heat Transfer Operators Associated with Quantum Operations

    E-Print Network [OSTI]

    Ç. Aksak; S. Turgut

    2011-04-14

    Any quantum operation applied on a physical system is performed as a unitary transformation on a larger extended system. If the extension used is a heat bath in thermal equilibrium, the concomitant change in the state of the bath necessarily implies a heat exchange with it. The dependence of the average heat transferred to the bath on the initial state of the system can then be found from the expectation value of a hermitian operator, which is named as the heat transfer operator (HTO). The purpose of this article is the investigation of the relation between the HTOs and the associated quantum operations. Since, any given quantum operation on a system can be realized by different baths and unitaries, many different HTOs are possible for each quantum operation. On the other hand, there are also strong restrictions on the HTOs which arise from the unitarity of the transformations. The most important of these is the Landauer erasure principle. This article is concerned with the question of finding a complete set of restrictions on the HTOs that are associated with a given quantum operation. An answer to this question has been found only for a subset of quantum operations. For erasure operations, these characterizations are equivalent to the generalized Landauer erasure principle. For the case of generic quantum operations however, it appears that the HTOs obey further restrictions which cannot be obtained from the entropic restrictions of the generalized Landauer erasure principle.

  14. Waste Isolation Pilot Plant Status and Plans - 2010 | Department...

    Office of Environmental Management (EM)

    Status and Plans - 2010 Waste Isolation Pilot Plant Status and Plans - 2010 Overview of WIPP presented by Dr. Dave Moody. Waste Isolation Pilot Plant Status and Plans - 2010 More...

  15. Status of the NGNP Fuel Experiment AGR-2 Irradiated in the Advanced Test Reactor

    SciTech Connect (OSTI)

    Blaine Grover

    2012-10-01

    The United States Department of Energy’s Next Generation Nuclear Plant (NGNP) Advanced Gas Reactor (AGR) Fuel Development and Qualification Program will be irradiating up to seven separate low enriched uranium (LEU) tri-isotopic (TRISO) particle fuel (in compact form) experiments in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory (INL). These irradiations and fuel development are being accomplished to support development of the next generation reactors in the United States, and will be irradiated over the next several years to demonstrate and qualify new TRISO coated particle fuel for use in high temperature gas reactors. The goals of the irradiation experiments are to provide irradiation performance data to support fuel process development, to qualify fuel for normal operating conditions, to support development and validation of fuel performance and fission product transport models and codes, and to provide irradiated fuel and materials for post irradiation examination (PIE) and safety testing. The experiments, which will each consist of at least six separate capsules, will be irradiated in an inert sweep gas atmosphere with individual on-line temperature monitoring and control of each capsule. The sweep gas will also have on-line fission product monitoring on its effluent to track performance of the fuel in each individual capsule during irradiation. The first experiment (designated AGR-1) started irradiation in December 2006 and was completed in November 2009. The second experiment (AGR-2), which utilized the same experiment design as well as control and monitoring systems as AGR-1, started irradiation in June 2010 and is currently scheduled to be completed in April 2013. The design of this experiment and support systems will be briefly discussed, followed by the progress and status of the experiment to date.

  16. Energy Department Announces Student Teams, Location for Solar...

    Office of Environmental Management (EM)

    Student Teams, Location for Solar Decathlon 2015 Energy Department Announces Student Teams, Location for Solar Decathlon 2015 February 13, 2014 - 1:00pm Addthis News Media Contact...

  17. Optimization Online - p-facility Huff location problem on networks

    E-Print Network [OSTI]

    Rafael Blanquero

    2014-10-30

    Oct 30, 2014 ... Abstract: The p-facility Huff location problem aims at locating facilities on a competitive environment so as to maximize the market share.

  18. Research Site Locations for Current and Former EERE Postdoctoral...

    Broader source: Energy.gov (indexed) [DOE]

    Research Site Locations for Current and Former EERE Postdoctoral Awards, from the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy. Facility Location...

  19. Open Location-Oriented Services for the Web

    E-Print Network [OSTI]

    Wilde, Erik

    2008-01-01

    Location Management for Mobile Devices. In Proceedings ofof wireless data services and mobile devices can take fullof location-awareness and mobile devices. Conclusions This

  20. Radio frequency security system, method for a building facility or the like, and apparatus and methods for remotely monitoring the status of fire extinguishers

    DOE Patents [OSTI]

    Runyon, Larry (Richland, WA); Gunter, Wayne M. (Richland, WA); Gilbert, Ronald W. (Gilroy, CA)

    2006-07-25

    A system for remotely monitoring the status of one or more fire extinguishers includes means for sensing at least one parameter of each of the fire extinguishers; means for selectively transmitting the sensed parameters along with information identifying the fire extinguishers from which the parameters were sensed; and means for receiving the sensed parameters and identifying information for the fire extinguisher or extinguishers at a common location. Other systems and methods for remotely monitoring the status of multiple fire extinguishers are also provided.

  1. Status and EAC Recommendations for Electricity Delivery Workforce...

    Energy Savers [EERE]

    Status and EAC Recommendations for Electricity Delivery Workforce (September 2014) Status and EAC Recommendations for Electricity Delivery Workforce (September 2014) This memo,...

  2. Reorganization Status of the Office of Energy Efficiency and...

    Office of Environmental Management (EM)

    Reorganization Status of the Office of Energy Efficiency and Renewable Energy: Panel Observations Reorganization Status of the Office of Energy Efficiency and Renewable Energy:...

  3. The Status of Renewable Hydrogen and Energy Station Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Status of Renewable Hydrogen and Energy Station Technologies and Policy Recommendations The Status of Renewable Hydrogen and Energy Station Technologies and Policy...

  4. Status of the MAJORANA DEMONSTRATOR: A Search for Neutrinoless...

    Office of Scientific and Technical Information (OSTI)

    Status of the MAJORANA DEMONSTRATOR: A Search for Neutrinoless Double-Beta Decay Citation Details In-Document Search Title: Status of the MAJORANA DEMONSTRATOR: A Search for...

  5. 3-D Combustion Simulation Strategy Status, Future Potential,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combustion Simulation Strategy Status, Future Potential, and Application Issues 3-D Combustion Simulation Strategy Status, Future Potential, and Application Issues 2004 Diesel...

  6. Waste Isolation Pilot Plant Status and Plans - 2010

    Office of Environmental Management (EM)

    Status and Plans WIPP Status and Plans - - 2010 2010 National Transportation Stakeholders Forum National Transportation Stakeholders Forum Chicago, Illinois Chicago, Illinois May...

  7. Waste Isolation Pilot Plant Update and Status of Recovery | Department...

    Office of Environmental Management (EM)

    Status of Recovery Topic: Dana Bryson CBFO, Provided Information on the Status of the WIPP Site Recovery. Information Provided Included the two WIPP Events that Resulted in the...

  8. Fusion Nuclear Science and Technology Program - Status and Plans...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fusion Nuclear Science and Technology Program - Status and Plans for Tritium Research Fusion Nuclear Science and Technology Program - Status and Plans for Tritium Research...

  9. ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #18

    E-Print Network [OSTI]

    1 ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #18 Pedro Quintana 2010 #12;2 Ecological Studies of Willow (Salix caroliniana): Monthly Status Report #16 Covering

  10. Status of High Power Tests of Normal Conducting Short Standing...

    Office of Scientific and Technical Information (OSTI)

    Status of High Power Tests of Normal Conducting Short Standing Wave Structures Citation Details In-Document Search Title: Status of High Power Tests of Normal Conducting Short...

  11. NAFTA Heavy Duty Engine and Aftertreatment Technology: Status...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NAFTA Heavy Duty Engine and Aftertreatment Technology: Status and Outlook NAFTA Heavy Duty Engine and Aftertreatment Technology: Status and Outlook Presentation given at DEER 2006,...

  12. Status Prospects of Green Data Center | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Status Prospects of Green Data Center Status Prospects of Green Data Center Information on energy-saving technology research of green data centers and the potential impacts....

  13. EV Everywhere Grand Challenge - Battery Status and Cost Reduction...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status and Cost Reduction Prospects EV Everywhere Grand Challenge - Battery Status and Cost Reduction Prospects Presentation given by technology manager David Howell at the EV...

  14. Current Status of the Spent Nuclear Fuel Management Program in...

    Office of Scientific and Technical Information (OSTI)

    Current Status of the Spent Nuclear Fuel Management Program in the United States. Citation Details In-Document Search Title: Current Status of the Spent Nuclear Fuel Management...

  15. Mission Operations & Data Systems

    E-Print Network [OSTI]

    Mojzsis, Stephen J.

    Mission Operations & Data Systems The LASP Mission Operations & Data Systems (MO&DS) group staffs and instruments. Operational software acts like the health systems in a body, ensuring that temperature, energy. The software monitors the health of on-board systems; anything unusual is flagged and sent to mission operators

  16. Operations Research Giorgio Gallo

    E-Print Network [OSTI]

    Gallo, Giorgio

    Operations Research Giorgio Gallo Operations Research (OR) is defined, according to the International Fed- eration of Operational Research Societies, as a scientific approach to the solution are thus crucial to almost all aspects of OR, research and practice. Operations Research, the origins

  17. Tel: Name: Rm. Tel: Location: Rm.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired Solar FuelTechnologyTel: Name: Rm. Tel: Location: Rm. Oct 2, 2015 Amin,

  18. Sandia National Laboratories: Locations: Kauai Test Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation ofAlbuquerque Albuquerque Housing Education Recreation Locations LifeKauai Test

  19. Sandia National Laboratories: Locations: Livermore, California

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation ofAlbuquerque Albuquerque Housing Education Recreation Locations LifeKauai

  20. Representation of Terrain Data Using a Mathematical "Drill" Operator

    E-Print Network [OSTI]

    Franklin, W. Randolph

    Representation of Terrain Data Using a Mathematical "Drill" Operator Christopher S. Stuetzle1 and W and Franklin (RPI) Autocarto 2012 17 Sep 2012 6 / 24 #12;The Drill Operator v Then cut along an ever deeper Creates hydrography. 1 How can we fit a drill to a terrain location (pixel) p? 2 How can we represent

  1. 2000-2011 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY Hurricane Sandy

    E-Print Network [OSTI]

    © 2000-2011 New York Independent System Operator, Inc. All Rights Reserved. DRAFT ­ FOR DISCUSSION Management Committee Meeting November 2, 2012 #12;2© 2000-2011 New York Independent System Operator, Inc. All Infrastructure Status Operations Recovery Storm Impacts to NYCA Loads Topics #12;3© 2000-2011 New York

  2. MHD Technology Transfer, Integration and Review Committee. Seventh semi-annual status report, April 1991--September 1991

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    This seventh semi-annual status report of the MHD Technology Transfer, Integration and Review Committee (TTIRC) summarizes activities of the TTIRC during the period April 1991 through September 1991. It includes a summary and minutes of the General Committee meeting, progress summaries of ongoing POC contracts, discussions pertaining to technical integration issues in the POC program, and planned activities for the next six months. The meeting included test plan with Western coal, seed regeneration economics, power management for the integrated topping cycle and status of the Clean Coal Technology Proposal activities. Appendices cover CDIF operations HRSR development, CFFF operations etc.

  3. Building Operator Certification 

    E-Print Network [OSTI]

    Lilley, D.

    2013-01-01

    Certification Energy Efficiency through Operator Training CATEE December 18, 2013 – San Antonio, TX Dennis Lilley, CEM, PMP ESL-KT-13-12-49 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Building Operator Certification... Energy Efficiency through Operator Training What is Building Operator Certification? Industry-recognized credential in energy efficient building operation practices Created with 100 industry experts Launched in 1996 9,000 building engineers...

  4. An Energy Efficient Location Service for Mobile Ad Hoc etworks

    E-Print Network [OSTI]

    Varela, Carlos

    the distance traveled by the location update and query packets and, thus, at reducing the overall energy cost by the location update and query packets and, thus, to reduce the overall energy cost. 2 Energy Efficient LocationAn Energy Efficient Location Service for Mobile Ad Hoc etworks Zijian Wang1 , Eyuphan Bulut1

  5. STATUS OF MECHANICAL SLUDGE REMOVAL AND COOLING COILS CLOSURE AT THE SAVANNAH RIVER SITE - F TANK FARM CLOSURE PROJECT - 9225

    SciTech Connect (OSTI)

    Jolly, R

    2009-01-06

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal using the Waste on Wheels (WOW) system within two of its storage tanks. The Waste on Wheels (WOW) system is designed to be relatively mobile with the ability for many components to be redeployed to multiple tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2839 cubic meters (750,000 gallons) each. In addition, Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. DOE intends to remove from service and operationally close Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. After obtaining regulatory approval, the tanks and cooling coils will be isolated and filled with grout for long term stabilization. Mechanical Sludge Removal of the remaining sludge waste within Tank 6 removed {approx} 75% of the original 25,000 gallons in August 2007. Utilizing lessons learned from Tank 6, Tank 5 Mechanical Sludge Removal completed removal of {approx} 90% of the original 125 cubic meters (33,000 gallons) of sludge material in May 2008. The successful removal of sludge material meets the requirement of approximately 19 to 28 cubic meters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. The Chemical Cleaning Process will utilize 8 wt% oxalic acid to dissolve the remaining sludge heel. The flow sheet for Chemical Cleaning planned a 20:1 volume ratio of acid to sludge for the first strike with mixing provided by the submersible mixer pumps. The subsequent strikes will utilize a 13:1 volume ratio of acid to sludge with no mixing. The results of the Chemical Cleaning Process are detailed in the 'Status of Chemical Cleaning of Waste Tanks at the Savannah River Site--F Tank Farm Closure Project--Abstract 9114'. To support Tank 5 and Tank 6 cooling coil closure, cooling coil isolation and full scale cooling coil grout testing was completed to develop a strategy for grouting the horizontal and vertical cooling coils. This paper describes in detail the performance of the Mechanical Sludge Removal activities and SMP operational strategies within Tank 5. In addition, it will discuss the current status of Tank 5 & 6 cooling coil isolation activities and the results from the cooling coil grout fill tests.

  6. Power, status, and learning in organizations

    E-Print Network [OSTI]

    Bunderson, J. Stuart

    This paper reviews the scholarly literature on the effects of social hierarchy—differences in power and status among organizational actors—on collective learning in organizations and groups. We begin with the observation ...

  7. Structure formation: Models, Dynamics and Status

    E-Print Network [OSTI]

    T. Padmanabhan

    1995-08-25

    The constraints on the models for the structure formation arising from various cosmological observations at different length scales are reviewed. The status of different models for structure formation is examined critically in the light of these observations.

  8. Status of Chemical Freeze-Out

    E-Print Network [OSTI]

    J. Cleymans; H. Oeschler; K. Redlich; S. Wheaton

    2006-07-14

    The status of the energy dependence of the chemical freeze-out temperature and chemical potential obtained in heavy ion collisions is presented. Recent proposals for chemical freeze-out conditions are compared.

  9. Status of the MAJORANA DEMONSTRATOR experiment

    SciTech Connect (OSTI)

    Martin, R. D.; Abgrall, N.; Aguayo, Estanislao; Avignone, F. T.; Barabash, Alexander S.; Bertrand, F.; Boswell, M.; Brudanin, V.; Busch, Matthew; Caldwell, A. S.; Chan, Yuen-Dat; Christofferson, Cabot-Ann; Combs, Dustin C.; Detwiler, Jason A.; Doe, P. J.; Efremenko, Yuri; Egorov, Viatcheslav; Ejiri, H.; Elliott, S.; Esterline, James H.; Fast, James E.; Finnerty, P.; Fraenkle, Florian; Galindo-Uribarri, A.; Giovanetti, G. K.; Goett, J.; Green, M.; Gruszko, J.; Guiseppe, Vincente; Gusev, K.; Hallin, A. L.; Hazama, R.; Hegai, A.; Henning, R.; Hoppe, Eric W.; Howard, Stanley; Howe, M. A.; Keeter, K.; Kidd, M. F.; Kochetov, Oleg; Konovalov, S.; Kouzes, Richard T.; LaFerriere, Brian D.; Leon, Jonathan D.; Leviner, L.; Loach, J. C.; MacMullin, J.; MacMullin, S.; Mertens, S.; Mizouni, Leila; Nomachi, Masaharu; Orrell, John L.; O'Shaughnessy, Mark D.; Overman, Nicole R.; Phillips, David; Poon, Alan; Pushkin, K.; Radford, D. C.; Rielage, Keith; Robertson, R. G. H.; Romero-Romero, E.; Ronquest, M. C.; Schubert, Alexis G.; Shanks, B.; Shima, T.; Shirchenko, M.; Snavely, Kyle J.; Snyder, N.; Soin, Aleksandr; Suriano, Anne-Marie; Thompson, J.; Timkin, V.; Tornow, W.; Varner, R. L.; Vasilyev, Sergey; Vetter, Kai; Vorren, Kris R.; White, Brandon R.; Wilkerson, J. F.; Xu, W.; Yakushev, E.; Young, A.; Yu, Chang-Hong; Yumatov, Vladimir

    2014-07-08

    The MAJORANA DEMONSTRATOR neutrinoless double beta-decay experiment is currently under construction at the Sanford Underground Research Facility in South Dakota, USA. An overview and status of the experiment are given.

  10. Status of the MAJORANA DEMONSTRATOR experiment

    SciTech Connect (OSTI)

    Martin, R. D. [Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, CA, USA and Department of Physics, University of South Dakota, Vermillion, SD (United States); Abgrall, N.; Chan, Y-D.; Hegai, A.; Mertens, S.; Poon, A. W. P.; Vetter, K. [Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, CA (United States); Aguayo, E.; Fast, J. E.; Hoppe, E. W.; Kouzes, R. T.; LaFerriere, B. D.; Orrell, J. L.; Overman, N. R.; Soin, A. [Pacific Northwest National Laboratory, Richland, WA (United States); Avignone III, F. T. [Department of Physics and Astronomy, University of South Carolina, Columbia, SC, USA and Oak Ridge National Laboratory, Oak Ridge, TN (United States); Barabash, A. S.; Konovalov, S. I.; Yumatov, V. [Institute for Theoretical and Experimental Physics, Moscow (Russian Federation); Bertrand, F. E. [Oak Ridge National Laboratory, Oak Ridge, TN (United States); and others

    2014-06-24

    The MAJORANA DEMONSTRATOR neutrinoless double beta-decay experiment is currently under construction at the Sanford Underground Research Facility in South Dakota, USA. An overview and status of the experiment are given.

  11. Status Report Emergency Preparedness at Purdue

    E-Print Network [OSTI]

    Pittendrigh, Barry

    Status Report Emergency Preparedness at Purdue in the Post-Virginia Tech Tragedy Environment July indicators identified by the Safe School Initiative Final Report by the U.S. Secret Service and U and University Counseling Centers Directors, a summary

  12. National Hydrogen Learning Demonstration Status (Presentation)

    SciTech Connect (OSTI)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

    2012-02-01

    This presentation discusses U.S. DOE Learning Demonstration Project goals, fuel cell vehicle and H2 station deployment status, and technical highlights of vehicle and infrastructure analysis results and progress.

  13. Status of the LBNE Neutrino Beamline

    E-Print Network [OSTI]

    Papadimitriou, Vaia

    2011-01-01

    The Long Baseline Neutrino Experiment (LBNE) will utilize a neutrino beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a beam of neutrinos toward a detector placed at the Homestake Mine in South Dakota. The neutrinos are produced in a three-step process. First, protons from the Main Injector (60-120 GeV) hit a solid target and produce mesons. Then, the charged mesons are focused by a set of focusing horns into the decay pipe, towards the far detector. Finally, the mesons that enter the decay pipe decay into neutrinos. The parameters of the facility were determined taking into account several factors including the physics goals, the Monte Carlo modeling of the facility, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be ~700 kW, however some of the parameters were chosen to be able to deal with a beam power of 2.3 MW. We discuss here the stat...

  14. Environmental characterization of two potential locations at Hanford for a new production reactor

    SciTech Connect (OSTI)

    Watson, E.C.; Becker, C.D.; Fitzner, R.E.; Gano, K.A.; Imhoff, K.L.; McCallum, R.F.; Myers, D.A.; Page, T.L.; Price, K.R.; Ramsdell, J.V.; Rice D.G.; Schreiber D.L.; Skumatz L.A.; Sommer D.J.; Tawil J.J.; Wallace R.W.; Watson D.G.

    1984-09-01

    This report describes various environmental aspects of two areas on the Hanford Site that are potential locations for a New Production Reactor (NPR). The area known as the Skagit Hanford Site is considered the primary or reference site. The second area, termed the Firehouse Site, is considered the alternate site. The report encompasses an environmental characterization of these two potential NPR locations. Eight subject areas are covered: geography and demography; ecology; meteorology; hydrology; geology; cultural resources assessment; economic and social effects of station construction and operation; and environmental monitoring. 80 refs., 68 figs., 109 tabs.

  15. Procedure for developing biological input for the design, location, or modification of water-intake structures

    SciTech Connect (OSTI)

    Neitzel, D.A.; McKenzie, D.H.

    1981-12-01

    To minimize adverse impact on aquatic ecosystems resulting from the operation of water intake structures, design engineers must have relevant information on the behavior, physiology and ecology of local fish and shellfish. Identification of stimulus/response relationships and the environmental factors that influence them is the first step in incorporating biological information in the design, location or modification of water intake structures. A procedure is presented in this document for providing biological input to engineers who are designing, locating or modifying a water intake structure. The authors discuss sources of stimuli at water intakes, historical approaches in assessing potential/actual impact and review biological information needed for intake design.

  16. HVAC Commissioning - A Status Report in Taiwan 

    E-Print Network [OSTI]

    Yang, K. H.

    2006-01-01

    CommisioningCommisioning ?? A Status Report in TaiwanA Status Report in Taiwan Dr. K.H. YangDr. K.H. Yang Fellow ASHRAEFellow ASHRAEProfessor, National Sun Professor, National Sun YatYat--SenSenUniversityUniversityKaohsiungKaohsiung, Taiwan, Taiwankhkh--yang@mail.nsysu.edu.twyang@mail....H. Yang(07)5252000 #4217E-mail ? kh-yang@mail.nsysu.edu.tw ...

  17. Rapid/PSM - lessons learned from using PSA for plant status monitoring

    SciTech Connect (OSTI)

    Chu, B.B.; Young, J.; Weinzimmer, F.

    1987-01-01

    Power plant operation requires decisions that can affect both the availability of the plant and its compliance with operating guidelines. Taking equipment out of service may affect the ability of the plant to produce power at a certain power level and may also affect the status of the plant with regard to technical specifications. However, plant operators and supervisors possess few tools that can rapidly determine plant availability and system status, can assess the impact on plant health (e.g., likelihood of continued operation) of taking equipment in or out of service, and can present information on required actions or desired alternatives. The plant status monitor (PSM), which is a part of Rapid software development under the risk assessment program of the Nuclear Power Division at the Electric Power Research Institute (EPRI), is designed to provide such information to plant personnel as an aid to their decision making. The Rapid/PSM can assist the management of plant safety and productivity and can minimize the potential technical specification violations. This paper describes the lessons learned from the development and demonstration of Rapid/PSM software at GPU Nuclear Corporation's (GPUN's) Oyster Creek Nuclear Generation Plant.

  18. Locating hardware faults in a parallel computer

    DOE Patents [OSTI]

    Archer, Charles J.; Megerian, Mark G.; Ratterman, Joseph D.; Smith, Brian E.

    2010-04-13

    Locating hardware faults in a parallel computer, including defining within a tree network of the parallel computer two or more sets of non-overlapping test levels of compute nodes of the network that together include all the data communications links of the network, each non-overlapping test level comprising two or more adjacent tiers of the tree; defining test cells within each non-overlapping test level, each test cell comprising a subtree of the tree including a subtree root compute node and all descendant compute nodes of the subtree root compute node within a non-overlapping test level; performing, separately on each set of non-overlapping test levels, an uplink test on all test cells in a set of non-overlapping test levels; and performing, separately from the uplink tests and separately on each set of non-overlapping test levels, a downlink test on all test cells in a set of non-overlapping test levels.

  19. Location Independent Professional Project: A Pilot Study

    SciTech Connect (OSTI)

    Hudson, J.A.; Long, J.P.; Miller, M.M.

    1999-02-01

    This pilot study project explored the problem of providing access to the nomadic worker who desires to connect a computer through network access points at a number of different locations within the SNL/NM campus as well as outside the campus. The design and prototype development gathered knowledge that may allow a design to be developed that could be extended to a larger number of SNL/NM network drop boxes. The focus was to provide a capability for a worker to access the SNL IRN from a network drop box (e.g. in a conference room) as easily as when accessing the computer network from the office normally used by the worker. Additional study was done on new methods to authenticate the off campus worker, and protect and control access to data.

  20. TRANSP and PTRANSP at PPPL: Status and Plans

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    , supporting plasma physics research groups around the world. In this poster, status and plans for TRANSP

  1. Quarterly Construction Status Report Period Ending: December 31, 2014

    E-Print Network [OSTI]

    Alpay, S. Pamir

    Cast Stone Replacement 901833 Quarterly Construction Status Report for Period Ending: December 31, 2014

  2. A reciprocal space approach for locating symmetry elements in Patterson superposition maps

    SciTech Connect (OSTI)

    Hendrixson, T.

    1990-09-21

    A method for determining the location and possible existence of symmetry elements in Patterson superposition maps has been developed. A comparison of the original superposition map and a superposition map operated on by the symmetry element gives possible translations to the location of the symmetry element. A reciprocal space approach using structure factor-like quantities obtained from the Fourier transform of the superposition function is then used to determine the best'' location of the symmetry element. Constraints based upon the space group requirements are also used as a check on the locations. The locations of the symmetry elements are used to modify the Fourier transform coefficients of the superposition function to give an approximation of the structure factors, which are then refined using the EG relation. The analysis of several compounds using this method is presented. Reciprocal space techniques for locating multiple images in the superposition function are also presented, along with methods to remove the effect of multiple images in the Fourier transform coefficients of the superposition map. In addition, crystallographic studies of the extended chain structure of (NHC{sub 5}H{sub 5})SbI{sub 4} and of the twinning method of the orthorhombic form of the high-{Tc} superconductor YBa{sub 2}Cu{sub 3}O{sub 7-x} are presented. 54 refs.

  3. Climate Data Operators (CDO)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Climate Data Operators (CDO) Climate Data Operators (CDO) Description and Overview CDO is a large tool set for working on climate data. NetCDF 34, GRIB including SZIP compression,...

  4. OSPREY Model Development Status Update

    SciTech Connect (OSTI)

    Veronica J Rutledge

    2014-04-01

    During the processing of used nuclear fuel, volatile radionuclides will be discharged to the atmosphere if no recovery processes are in place to limit their release. The volatile radionuclides of concern are 3H, 14C, 85Kr, and 129I. Methods are being developed, via adsorption and absorption unit operations, to capture these radionuclides. It is necessary to model these unit operations to aid in the evaluation of technologies and in the future development of an advanced used nuclear fuel processing plant. A collaboration between Fuel Cycle Research and Development Offgas Sigma Team member INL and a NEUP grant including ORNL, Syracuse University, and Georgia Institute of Technology has been formed to develop off gas models and support off gas research. Georgia Institute of Technology is developing fundamental level model to describe the equilibrium and kinetics of the adsorption process, which are to be integrated with OSPREY. This report discusses the progress made on expanding OSPREY to be multiple component and the integration of macroscale and microscale level models. Also included in this report is a brief OSPREY user guide.

  5. SWPF Crane Lift Operation

    SciTech Connect (OSTI)

    None

    2010-01-01

    A multiple vview shot of the SWPF crane lift operation at the Savannah River Site. Funded by the Recovery Act.

  6. Current status and future plan of uranium enrichment technology

    SciTech Connect (OSTI)

    Yonekawa, S.; Yamamoto, F.; Yato, Y.; Kishimoto, Y.

    1994-12-31

    The Power Reactor and Nuclear Fuel Development Corporation (PNC) has been conducting extensive research and development (R&D) on the centrifuge process for more than a quarter of a century. This development program, designated as a national project in 1972, has resulted in the construction and operation of a pilot plant with a capacity of 50 t separative work unit (SWU) per year as well as a demonstration plant with a capacity of 200 t SWU/yr. Under the basic agreement of cooperation concluded in 1985, the technology developed in this program has been transferred to Japan Nuclear Fuel Limited (JNFL), which is now constructing and operating the commercial plant with a capacity of 1500 t SWU/yr at Rokkasho, Aomori. This paper describes the operational experiences of the demonstration plant, the status of a new material centrifuge, which will be introduced at a later stage of construction of the commercial plant, the development of an advanced centrifuge as a next-generation machine, and the research of a superadvanced centrifuge.

  7. Fuel Cell Buses in U.S. Transit Fleets: Current Status 2011

    SciTech Connect (OSTI)

    Eudy, L.; Chandler, K.; Gikakis, C.

    2011-11-01

    This status report, fifth in a series of annual status reports from the U.S. Department of Energy's National Renewable Energy Laboratory (NREL), discusses the achievements and challenges of fuel cell propulsion for transit and summarizes the introduction of fuel cell transit buses in the United States. Progress this year includes an increase in the number of fuel cell electric buses (FCEBs), from 15 to 25, operating at eight transit agencies, as well as increased diversity of the fuel cell design options for transit buses. The report also provides an analysis of the combined results from fuel cell transit bus demonstrations evaluated by NREL with a focus on the most recent data through July 2011 including fuel cell power system reliability and durability; fuel economy; roadcall; and hydrogen fueling results. These evaluations cover 22 of the 25 FCEBs currently operating.

  8. Underground coal gasification: a brief review of current status

    SciTech Connect (OSTI)

    Shafirovich, E.; Varma, A.

    2009-09-15

    Coal gasification is a promising option for the future use of coal. Similarly to gasification in industrial reactors, underground coal gasification (UCG) produces syngas, which can be used for power generation or for the production of liquid hydrocarbon fuels and other valuable chemical products. As compared with conventional mining and surface gasification, UCG promises lower capital/operating costs and also has other advantages, such as no human labor underground. In addition, UCG has the potential to be linked with carbon capture and sequestration. The increasing demand for energy, depletion of oil and gas resources, and threat of global climate change lead to growing interest in UCG throughout the world. In this article, we review the current status of this technology, focusing on recent developments in various countries.

  9. Status of the Boeing Dish Engine Critical Component Project

    SciTech Connect (OSTI)

    Brau, H.W.; Diver, R.B.; Nelving, H.; Stone, K.W.

    1999-01-08

    The Boeing Company's Dish Engine Critical Component (DECC) project started in April of 1998. It is a continuation of a solar energy program started by McDonnell Douglas (now Boeing) and United Stirling of Sweden in the mid 1980s. The overall objectives, schedule, and status of this project are presented in this paper. The hardware test configuration, hardware background, operation, and test plans are also discussed. A summary is given of the test data, which includes the daily power performance, generated energy, working-gas usage, mirror reflectivity, solar insolation, on-sun track time, generating time, and system availability. The system performance based upon the present test data is compared to test data from the 1984/88 McDonnell Douglas/United Stirling AB/Southem California Edison test program. The test data shows that the present power, energy, and mirror performance is comparable to when the hardware was first manufactured 14 years ago.

  10. StreamNet; Northwest Aquatic Resource Information Network - Status of Salmon and Steelhead in the Columbia River Basin, 1995 Final Report.

    SciTech Connect (OSTI)

    Anderson, Duane A.; Beamesderfer, Raymond C. [Oregon Dept. of Fish and Wildlife, Enterprise, OR (United States); Woodard, Bob [Washington Dept. of Fish and Wildlife, Olympia, WA (United States)

    1996-04-01

    Information on fish populations, fisheries, and fish habitat is crucial to the success of ongoing program to protect, recover, enhance, and manage fish resources in the Columbia River Basin. However, pertinent data are often difficult to locate because it is scattered among many agencies and is often unpublished. The goal of this annual report is to bring many diverse data types and sources into a single comprehensive report on the status of anadromous fish runs in the Columbia River Basin and the environmental conditions that may affect that status. Brief summaries are provided to identify the type and scope of available information. This synopsis is intended to complement other more detailed reports to which readers are referred for comprehensive treatment of specific subjects. This first report focuses mainly on anadromous salmon and steelhead (primarily through 1994) but the authors intend to expand the scope of future issues to include resident species. This is the first of what the authors intend to be an annual report. They welcome constructive suggestions for improvements. This report is a product of the StreamNet (formerly Coordinated Information System and Northwest Environmental Data Base) project which is a part of the Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The project is called for in the Fish and Wildlife Program of the Northwest Power Planning Council. The project`s objective is to promote exchange and dissemination of information in a standardized electronic format throughout the basin. This project is administered by the Pacific States Marine Fisheries Commission with active participation by tribal, state, and federal fish and wildlife agencies.

  11. Operations Research Analyst

    Broader source: Energy.gov [DOE]

    This position may be located in the Office of Energy Analysis or the Office of Energy Statistics of EIA. This position is established to provide an expert analyst to perform mathematical,...

  12. Technology status and project development risks of advanced coal power generation technologies in APEC developing economies

    SciTech Connect (OSTI)

    Lusica, N.; Xie, T.; Lu, T.

    2008-10-15

    The report reviews the current status of IGCC and supercritical/ultrasupercritical pulverized-coal power plants and summarizes risks associated with project development, construction and operation. The report includes an economic analysis using three case studies of Chinese projects; a supercritical PC, an ultrasupercritical PC, and an IGCC plant. The analysis discusses barriers to clean coal technologies and ways to encourage their adoption for new power plants. 25 figs., 25 tabs.

  13. An overview of RDF processing systems: Current status, design features, and future trends

    SciTech Connect (OSTI)

    Ohlsson, O.O. ); Walter, D.K. . Waste Material Management Div.); Goodman, B.J. )

    1991-01-01

    This paper discusses the recent history of refuse-derived fuel (RDF) processing facilities in the United States. The current status of these facilities, including environmental, institutional, and economic considerations is discussed. The unit operations used to produce a desired RDF product are described, and the future potential of RDF processing systems is evaluated. Current research sponsored by the US Department of Energy is also presented. 6 refs., 3 figs., 8 tabs.

  14. Environmental Programs: Status of Work and Current Priorities for FY13

    SciTech Connect (OSTI)

    Jones, Patricia [Los Alamos National Laboratory

    2012-08-17

    Presentation outline is: Mission/overview, Regulatory framework, Current status of cleanup, Shift in priorities to address highest risk, Removal of above-ground waste, Continued focus on protecting water resources, and Priorities for fiscal year 2013. LANL's Environmental Mission is to: (1) Repack and ship legacy transuranic waste containers; (2) Investigate and remediate Cold War (legacy) hazardous and radioactive waste areas; (3) Demolish unused buildings; (4) Disposition solid waste from Laboratory operations; and (5) Lifecycle cost nearly $3 billion.

  15. Analytical and experimental studies of leak location and environment characterization for the international space station

    SciTech Connect (OSTI)

    Woronowicz, Michael; Blackmon, Rebecca; Brown, Martin; Abel, Joshua; Hawk, Doug; Autrey, David; Glenn, Jodie; Bond, Tim; Buffington, Jesse; Cheng, Edward; Ma, Jonathan; Rossetti, Dino; DeLatte, Danielle; Garcia, Kelvin; Mohammed, Jelila; Montt de Garcia, Kristina; Perry, Radford; Tull, Kimathi; Warren, Eric

    2014-12-09

    The International Space Station program is developing a robotically-operated leak locator tool to be used externally. The tool would consist of a Residual Gas Analyzer for partial pressure measurements and a full range pressure gauge for total pressure measurements. The primary application is to demonstrate the ability to detect NH{sub 3} coolant leaks in the ISS thermal control system. An analytical model of leak plume physics is presented that can account for effusive flow as well as plumes produced by sonic orifices and thruster operations. This model is used along with knowledge of typical RGA and full range gauge performance to analyze the expected instrument sensitivity to ISS leaks of various sizes and relative locations (“directionality”). The paper also presents experimental results of leak simulation testing in a large thermal vacuum chamber at NASA Goddard Space Flight Center. This test characterized instrument sensitivity as a function of leak rates ranging from 1 lb{sub m/}/yr. to about 1 lb{sub m}/day. This data may represent the first measurements collected by an RGA or ion gauge system monitoring off-axis point sources as a function of location and orientation. Test results are compared to the analytical model and used to propose strategies for on-orbit leak location and environment characterization using the proposed instrument while taking into account local ISS conditions and the effects of ram/wake flows and structural shadowing within low Earth orbit.

  16. Hanford Site air operating permit application

    SciTech Connect (OSTI)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  17. A unified Bayesian framework for relative microseismic location

    E-Print Network [OSTI]

    Poliannikov, Oleg V.

    We study the problem of determining an unknown microseismic event location relative to previously located events using a single monitoring array in a monitoring well. We show that using the available information about the ...

  18. Locations of Smart Grid Demonstration and Large-Scale Energy...

    Office of Environmental Management (EM)

    Locations of Smart Grid Demonstration and Large-Scale Energy Storage Projects Locations of Smart Grid Demonstration and Large-Scale Energy Storage Projects Map of the United States...

  19. A unified Bayesian framework for relative microseismic location

    E-Print Network [OSTI]

    Poliannikov, Oleg V.

    2013-01-01

    We study the problem of determining an unknown microseismic event location relative to previously located events using a single monitoring array in a monitoring well. We show that using the available information about the ...

  20. The Cricket Indoor Location System Nissanka Bodhi Priyantha

    E-Print Network [OSTI]

    applications. Cricket consists of location beacons that are attached to the ceiling of a building to compute their own locations. This active-beacon passive-listener architecture is scalable with respect

  1. Fire Alarm Control Panel is located in Switchgear

    E-Print Network [OSTI]

    KEY: NORTH CHDD-South Floor 1 Fire Alarm Control Panel is located in Switchgear Room #CD11A Panel is located in Switchgear Room #CD11A on Basement Level Evacuation Route Exit Restroom Fire

  2. Policy-aware sender anonymity in Location-based services

    E-Print Network [OSTI]

    Vyas, Avinash

    2011-01-01

    LBS Server Location Server CSP Sender Figure 1.1: LBS ModelService Provider, denoted as CSP, the Location Server,is either the MPC in the CSP’s network or an Over-The-Top (

  3. The ear as a location for wearable vital signs monitoring

    E-Print Network [OSTI]

    He, David Da

    Obtaining vital signs non-invasively and in a wearable manner is essential for personal health monitoring. We propose the site behind the ear as a location for an integrated wearable vital signs monitor. This location is ...

  4. A Look at Health Care Buildings - Where are they located

    U.S. Energy Information Administration (EIA) Indexed Site

    Location Return to: A Look at Health Care Buildings How large are they? How many employees are there? Where are they located? How old are they? Who owns and occupies them? Are they...

  5. Cosmic Flows: A Status Report

    E-Print Network [OSTI]

    Stephane Courteau; Avishai Dekel

    2001-06-03

    We give a brief review of recent developments in the study of the large-scale velocity field of galaxies since the international workshop on Cosmic Flows held in July 1999 in Victoria, B.C. Peculiar velocities (PVs) yield a tight and unique constraint on cosmological characteristics, independent of Lambda and biasing, such as the cosmological matter density parameter Omega_m and the convergence of bulk flows on large scales. Significant progress towards incorporating non-linear dynamics and improvements of velocity field reconstruction techniques have led to a rigorous control of errors and much refined cosmic flow analyses. Current investigations favor low-amplitude (< 250 km/s) bulk flows on the largest scales (< ~100 Mpc/h) probed reliably by existing redshift-distance surveys, consistent with favored LambdaCDM cosmogonies. Tidal field analyses also suggest that the Shapley Concentration, located behind the Great Attractor (GA), might play an important dynamical role, even at the Local Group. Low-amplitude density fluctuations on very large scales generate the overall large-scale streaming motions while massive attractors like the GA, and Perseus-Pisces account for smaller scale motions which are superposed on the large-scale flow. Likelihood analyses of galaxy PVs, in the framework of flat CDM cosmology, now provide tight constraints of Omega_m = 0.35 +/- 0.05. A four-fold size increase of our data base is expected in the next 4-5 years with the completion of next generation FP/TF surveys and automated supernovae searches within 20,000 km/s.

  6. National Ignition Facility and Managing Location, Component, and State

    SciTech Connect (OSTI)

    Foxworthy, C; Fung, T; Beeler, R; Li, J; Dugorepec, J; Chang, C

    2011-07-25

    The National Ignition Facility (NIF) at the Lawrence Livermore National Laboratory is a stadium-sized facility that contains a 192-beam, 1.8-Megajoule, 500-Terawatt, ultraviolet laser system coupled with a 10-meter diameter target chamber. There are over 6,200 Line Replaceable Units (LRUs) comprised of more than 104,000 serialized parts that make up the NIF. Each LRU is a modular unit typically composed of a mechanical housing, laser optics (glass, lenses, or mirrors), and utilities. To date, there are more than 120,000 data sets created to characterize the attributes of these parts. Greater than 51,000 Work Permits have been issued to install, maintain, and troubleshoot the components. One integrated system is used to manage these data, and more. The Location Component and State (LoCoS) system is a web application built using Java Enterprise Edition technologies and is accessed by over 1,200 users. It is either directly or indirectly involved with each aspect of NIF work activity, and interfaces with ten external systems including the Integrated Computer Control System (ICCS) and the Laser Performance Operations Model (LPOM). Besides providing business functionality, LoCoS also acts as the NIF enterprise service bus. In this role, numerous integration approaches had to be adopted including: file exchange, database sharing, queuing, and web services in order to accommodate various business, technical, and security requirements. Architecture and implementation decisions are discussed.

  7. Apparatus and method for maintaining low temperatures about an object at a remote location

    DOE Patents [OSTI]

    Steyert, Jr., William A. (Los Alamos, NM); Overton, Jr., William C. (Los Alamos, NM)

    1982-01-01

    The disclosure is directed to an apparatus and method for maintaining a body at cryogenic temperatures at a remote location such as down a borehole for an extended period of time. A housing contains a body comprising a material having a high specific heat at cryogenic temperatures such as between about 2 and 15 K. The body contains an orifice for containing an instrument or instruments operable at superconducting temperatures. The apparatus is precooled at the surface and lowered into a borehole to a desired depth, such as 2 to 3 miles. The instruments are operated, and the apparatus withdrawn, the material of the body maintaining the very low temperatures at which the instrument(s) operate for a sufficient period of time at the remote or downhole location. The material may comprise a rare earth compound, such as Gd.sub.2 O.sub.3, Gd.sub.2 Se.sub.3, Gd.sub.2 O.sub.2 S or GdAlO.sub.3. Monoclinic and C-phase gadolinium oxides work well. A low temperature is maintainable at a remote location for several hours.

  8. Apparatus and method for maintaining low temperatures about an object at a remote location. [Patent application

    DOE Patents [OSTI]

    Steyert, W.A. Jr.; Overton, W.C. Jr.

    1980-10-29

    The disclosure is directed to an apparatus and method for maintaining a body at cryogenic temperatures at a remote location such as down a borehole for an extended period of time. A housing contains a body comprising a material having a high specific heat at cryogenic temperatures such as between about 2 and 15 K. The body contains an orifice for containing an instrument or instruments operable at superconducting temperatures. The apparatus is precooled at the surface and lowered into a borehole to a desired depth, such as 2 to 3 miles. The instruments are operated, and the apparatus withdrawn, the material of the body maintaining the very low temperatures at which the instrument(s) operate for a sufficient period of time at the remote or downhole location. The material may comprise a rare earth compound, such as Gd/sub 2/O/sub 3/, Gd/sub 2/Se/sub 3/, Gd/sub 2/O/sub 2/S or GdAlO/sub 3/. Monoclinic and C-phase gadolinium oxides work well. A low temperature is maintainable at a remote location for several hours.

  9. TOPICS IN PROBABILISTIC LOCATION ESTIMATION IN WIRELESS NETWORKS

    E-Print Network [OSTI]

    Myllymäki, Petri

    TOPICS IN PROBABILISTIC LOCATION ESTIMATION IN WIRELESS NETWORKS Petri Kontkanen, Petri Myllym;TOPICS IN PROBABILISTIC LOCATION ESTIMATION IN WIRELESS NETWORKS Petri Kontkanen, Petri Myllym¨aki, Teemu, Spain, IEEE Press, 2004. TOPICS IN PROBABILISTIC LOCATION ESTIMATION IN WIRELESS NETWORKS Petri

  10. COMBINING LOCATION AND EXPRESSION DATA FOR PRINCIPLED DISCOVERY OF

    E-Print Network [OSTI]

    Hartemink, Alexander

    location data to guide the model induction process. We combine these two data modalities by al- lowing combine genomic location and expression data to guide the model induction process by permitting the formerCOMBINING LOCATION AND EXPRESSION DATA FOR PRINCIPLED DISCOVERY OF GENETIC REGULATORY NETWORK

  11. Risks of using AP locations discovered through war driving

    E-Print Network [OSTI]

    Kotz, David

    Risks of using AP locations discovered through war driving Minkyong Kim, Jeffrey J. Fielding the actual locations are often unavailable, they use estimated locations from war driving estimated through war driving. War driving is the process of collecting Wi-Fi beacons by driving or walking

  12. Location-based Sponsored Search Advertising George Trimponias1

    E-Print Network [OSTI]

    Papadias, Dimitris

    Location-based Sponsored Search Advertising George Trimponias1 , Ilaria Bartolini2 , Dimitris unprecedented opportunities for location-based advertising. In this work, we provide models and investigate the market for location-based sponsored search, where advertisers pay the search engine to be displayed

  13. Static and Dynamic Location Management in Distributed Mobile Environments

    E-Print Network [OSTI]

    Vaidya, Nitin

    Static and Dynamic Location Management in Distributed Mobile Environments P. Krishna y N. H. Vaidya for search, update and search-update. Static location management uses one combination of search, update the performance of di erent static location management strategies for various communicationand mobilitypatterns

  14. DDI Specification: Current Status and Outlook

    E-Print Network [OSTI]

    Thomas, Wendy; Gregory, Arofan

    2013-04-03

    DDI Specification: Current Status and Outlook Wendy Thomas Arofan Gregory NADDI 2013 3.2 Public Review 3.2 schema complete and in subversion site branches/proposed3.2/schema Field level documentation has been revised throughout and is available...DDI Specification: Current Status and Outlook Wendy Thomas Arofan Gregory NADDI 2013 3.2 Public Review • 3.2 schema complete and in subversion site branches/proposed3.2/schema • Field level documentation has been revised throughout...

  15. Annual status report on the Uranium Mill Tailings Remedial Action Program

    SciTech Connect (OSTI)

    Not Available

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA).

  16. Cask fleet operations study

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system.

  17. The Future of Sustainable Waste Management: Challenging the Status Quo STEPHEN J. JONES, President and C.E.O., Covanta Energy, Morristown, NJ

    E-Print Network [OSTI]

    The Future of Sustainable Waste Management: Challenging the Status Quo STEPHEN J. JONES, President and C.E.O., Covanta Energy, Morristown, NJ 10:10am-11:10am Location: 833 Mudd (SEAS wastes, projected to double in the next fifteen years. Recycling is the first priority for sustainable

  18. Spectral Operators of Matrices

    E-Print Network [OSTI]

    2014-01-10

    Jan 10, 2014 ... a thorough study on a new class of matrix valued functions, coined as spectral operators of ..... not self-adjoint. ...... 9 (1981) 1135–1151.

  19. Transmission and Storage Operations

    Energy Savers [EERE]

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014...

  20. Operations Committee Report

    Broader source: Energy.gov (indexed) [DOE]

    to the Commission to Review Effectiveness of National Energy Laboratories Jeff Smith Deputy for Operations Oak Ridge National Laboratory February 24, 2015 The Importance...

  1. Bevalac Operations, 1991

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    This report discusses the following aspects of the Bevalac: Accelerator Technology and Operations Summary; Support for Space Exploration; Nuclear Science Research; and Biomedical Research.

  2. Bevalac Operations, 1989

    SciTech Connect (OSTI)

    Not Available

    1990-06-01

    This report discusses the following topics in relation to the Bevalac accelerator: accelerator technology operations summary; nuclear science; biomedical research; and publications and presentations.

  3. 110. Location efficiency Discovering the hidden transportation costs of where you live page 1 / 1 110. Location efficiency

    E-Print Network [OSTI]

    Machel, Hans

    110. Location efficiency Discovering the hidden transportation costs of where you live page 1 / 1 110. Location efficiency: Discovering the hidden transportation costs of where you live Live location efficiency and it's the amount of time, energy and greenhouse gas emissions you spend getting

  4. Motor current signature analysis method for diagnosing motor operated devices

    DOE Patents [OSTI]

    Haynes, Howard D. (Kingston, TN); Eissenberg, David M. (Oak Ridge, TN)

    1990-01-01

    A motor current noise signature analysis method and apparatus for remotely monitoring the operating characteristics of an electric motor-operated device such as a motor-operated valve. Frequency domain signal analysis techniques are applied to a conditioned motor current signal to distinctly identify various operating parameters of the motor driven device from the motor current signature. The signature may be recorded and compared with subsequent signatures to detect operating abnormalities and degradation of the device. This diagnostic method does not require special equipment to be installed on the motor-operated device, and the current sensing may be performed at remote control locations, e.g., where the motor-operated devices are used in accessible or hostile environments.

  5. LEAD at Unidata Status Update, April 2009

    E-Print Network [OSTI]

    LEAD at Unidata Status Update, April 2009 Mohan Ramamurthy The LEAD project is currently in the no-cost extension period and nearing the end of its period of performance as an NSF Large ITR award. LEAD has and networking to huge data sets, human decision making and complex virtual organizations ­ LEAD functionality

  6. LEAD at Unidata Status Update, October 2009

    E-Print Network [OSTI]

    LEAD at Unidata Status Update, October 2009 Mohan Ramamurthy The official period of performance for the LEAD project ended on 30 September 2009 after a one-year the no-cost extension period. The six year ITR computing and networking to huge data sets, human decision making and complex virtual organizations ­ LEAD

  7. Neutrino oscillations: Current status and prospects

    E-Print Network [OSTI]

    Thomas Schwetz

    2005-10-25

    I summarize the status of neutrino oscillations from world neutrino oscillation data with date of October 2005. The results of a global analysis within the three-flavour framework are presented. Furthermore, a prospect on where we could stand in neutrino oscillations in ten years from now is given, based on a simulation of upcoming long-baseline accelerator and reactor experiments.

  8. Solar Photovoltaics development -Status and perspectives

    E-Print Network [OSTI]

    Solar Photovoltaics development - Status and perspectives Jørgen Fenhann Risø National Laboratory for the development of solar photovoltaics, contributing to the Macro Task E1 on production cost for fusion.S. with 53 MWp followed by Japan and EU. Until now off-grid installation have dominated the solar PV market

  9. Status and Impacts of State MTBE Bans

    Reports and Publications (EIA)

    2003-01-01

    This paper describes legislation passed in 16 states banning or restricting the use of methyl tertiary butyl ether (MTBE) in gasoline. Analysis of the status and impact of these state MTBE bans is provided concerning the supply and potential price changes of gasoline.

  10. Portal Status Update TransPort Meeting

    E-Print Network [OSTI]

    Bertini, Robert L.

    + Portal Status Update TransPort Meeting 6-11-14 #12;+ TRANSIT #12;+ Accomplishments - Transit Module) feed loading in Portal DB ! Compass rewrite in progress ! Modernized codebase allows for faster version of Portal map ! Allows for a Portal map to be embedded on other sites ! Automated import of Clark

  11. Finance Division Employee Status Form Finance Division

    E-Print Network [OSTI]

    Crews, Stephen

    Finance Division Employee Status Form Finance Division CB 1225, 104 Airport Drive Chapel Hill, NC Phone: 919-962-7242 finance.unc.edu Failure to Follow Instructions Below Will Delay Processing Today information in five areas: 1. Division-wide emergency call tree 2. Finance Web site contacts 3. Departmental

  12. CITIZENSHIP STATUS AND FINANCIAL AID ELIGIBILITY

    E-Print Network [OSTI]

    / refugee status in U.S. INS Form I-94 or I-94A stamped with "Section 207 - Refugee" or "Section 208 - Asylee", or a Refugee Travel Document (Form I-571). Aliens paroled into the U.S. pursuant to Section 212

  13. Check Aid Status & Loans on ISIS

    E-Print Network [OSTI]

    Fang, Yuguang "Michael"

    Check Aid Status & Loans on ISIS As a University of Florida (UF) financial aid applicant, you can business using ISIS (the UF Integrated Student Information System): www.isis.ufl.edu 1.CheCk Aid StAtuS/AwArdS on iSiS You are responsible for keeping track of your financial aid file and awards, including

  14. STATUS OF THE NRC'S DECOMMISSIONING PROGRAM

    SciTech Connect (OSTI)

    Orlando, D. A.; Camper, L. W.; Buckley, J.

    2002-02-25

    On July 21, 1997, the U.S. Nuclear Regulatory Commission published the final rule on Radiological Criteria for License Termination (the License Termination Rule) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program. It discusses the status of permanently shut-down commercial power reactors, complex decommissioning sites, and sites listed in the Site Decommissioning Management Plan. The paper provides the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including a Standard Review Plan for evaluating plans and information submitted by licensees to support the decommissioning of nuclear facilities and the D and D Screen software for determining the potential doses from residual radioactivity. Finally, it discusses the status of the staff's current efforts to streamline the decommissioning process.

  15. Status of the NRC Decommissioning Program

    SciTech Connect (OSTI)

    Orlando, D. A.; Camper, L.; Buckley, J.; Pogue, E.; Banovac, K.

    2003-02-24

    On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.

  16. Socio-Economic Status "Defining" SES parameters

    E-Print Network [OSTI]

    Gabrieli, John

    Socio-Economic Status Data "Defining" SES parameters · Objective SES: · Individual and/or householdArthur Ladder) · In Community (MacArthur Ladder) · Other considerations: · Social, economic, and psychological personal evaluation be reflection of self-esteem? - Half parent/half subject reports - Evidence

  17. Magnetic Confinement Fusion Science Status and Challenges

    E-Print Network [OSTI]

    Magnetic Confinement Fusion Science Status and Challenges S. Prager University of Wisconsin February, 2005 #12;Two approaches to fusion Inertial confinement extremely dense, short-lived Magnetic by centrifugal force of particles moving along curved magnetic field plasma magnetic field Centrifugal force #12

  18. Status of Higgs Boson Couplings and Searches

    E-Print Network [OSTI]

    Onyisi, Peter; The ATLAS collaboration

    2015-01-01

    The status of Higgs sector studies at the Large Hadron Collider is reviewed. The latest extractions of couplings and properties of the 125 GeV Higgs boson from the Run 1 data of the ATLAS and CMS experiments are discussed. Searches for additional Higgs boson states beyond that of the Standard Model are presented.

  19. The Health Status of Texas October 2014

    E-Print Network [OSTI]

    The Health Status of Texas 2014 October 2014 #12;#12;Acknowledgement This report was primarily compiled by the following individuals: Erin Rice, MA, Center for Health Statistics, DSHS Nagla Elerian, MS, Center for Health Statistics, DSHS Linda Gaul, PhD, State Epidemiologist, DSHS Additional contributors

  20. human spaceflight and operations

    E-Print Network [OSTI]

    Anand, Mahesh

    1 human spaceflight and operations Lunar Lander human spaceflight and operations #12;2 human cooperation in exploration prim ary objective opportunity for investigations #12;3 human spaceflight No RHUs LANDING SITE South Polar Reliant on Solar Power generation + conventional thermal control LAUNCHER

  1. Emergency Evacuation Operations Plan

    E-Print Network [OSTI]

    Eberhard, Marc O.

    Emergency Evacuation Operations Plan Civil and Environmental Engineering More Hall 2015 #12;1 Introduction Environmental Health and Safety (EH&S) developed this model Emergency Evacuation and Operations Plan (EEOP) to assist departments in preparing for building emergencies as expected and required

  2. Semantics for algebraic operations 

    E-Print Network [OSTI]

    Plotkin, Gordon; Power, John

    2003-01-01

    Given a category C with finite products and a strong monad T on C, we investigate axioms under which an ObC-indexed family of operations of the form ?_x : (Tx)n ! Tx provides a definitive semantics for algebraic operations ...

  3. Overview of Opportunities for Co-Location of Solar Energy Technologies and Vegetation

    SciTech Connect (OSTI)

    Macknick, J.; Beatty, B.; Hill, G.

    2013-12-01

    Large-scale solar facilities have the potential to contribute significantly to national electricity production. Many solar installations are large-scale or utility-scale, with a capacity over 1 MW and connected directly to the electric grid. Large-scale solar facilities offer an opportunity to achieve economies of scale in solar deployment, yet there have been concerns about the amount of land required for solar projects and the impact of solar projects on local habitat. During the site preparation phase for utility-scale solar facilities, developers often grade land and remove all vegetation to minimize installation and operational costs, prevent plants from shading panels, and minimize potential fire or wildlife risks. However, the common site preparation practice of removing vegetation can be avoided in certain circumstances, and there have been successful examples where solar facilities have been co-located with agricultural operations or have native vegetation growing beneath the panels. In this study we outline some of the impacts that large-scale solar facilities can have on the local environment, provide examples of installations where impacts have been minimized through co-location with vegetation, characterize the types of co-location, and give an overview of the potential benefits from co-location of solar energy projects and vegetation. The varieties of co-location can be replicated or modified for site-specific use at other solar energy installations around the world. We conclude with opportunities to improve upon our understanding of ways to reduce the environmental impacts of large-scale solar installations.

  4. Groundwater Level Status Report for Fiscal Year 2007 - Los Alamos National Laboratory

    SciTech Connect (OSTI)

    Shannon P. Allen, Richard J. Koch

    2008-03-17

    The status of groundwater level monitoring at Los Alamos National Laboratory in Fiscal Year 2007 is provided in this report. The Groundwater Level Monitoring Project was instituted in 2005 to provide a framework for the collection and processing of quality controlled groundwater level data. This report summarizes groundwater level data for 166 monitoring wells, including 45 regional aquifer wells, 25 intermediate wells, and 96 alluvial wells, and 11 water supply wells. Pressure transducers were installed in 133 monitoring wells for continuous monitoring of groundwater levels. Time-series hydrographs of groundwater level data are presented along with pertinent construction and location information for each well.

  5. ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #14

    E-Print Network [OSTI]

    1 ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #14 A willow island 19 April 2010 #12;2 Ecological Studies of Willow (Salix caroliniana): Monthly Status Report #14

  6. ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #15

    E-Print Network [OSTI]

    1 ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #15 Pedro Quintana, Orlando, Florida 32816 26 May 2010 #12;2 Ecological Studies of Willow (Salix caroliniana): Monthly Status

  7. ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #12

    E-Print Network [OSTI]

    1 ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #12 Willow sapling 15 February 2010 #12;2 Ecological Studies of Willow (Salix caroliniana): Monthly Status Report #9

  8. ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #17

    E-Print Network [OSTI]

    1 ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #17 Pedro Quintana;2 Ecological Studies of Willow (Salix caroliniana): Monthly Status Report #16 Covering the time period from

  9. ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #16

    E-Print Network [OSTI]

    1 ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #16 Pedro Quintana, Florida 32816 15 June 2010 #12;2 Ecological Studies of Willow (Salix caroliniana): Monthly Status Report

  10. Green Power Marketing in the United States: A Status Report

    E-Print Network [OSTI]

    ............................................................................................32 Retail Green Power MarketersGreen Power Marketing in the United States: A Status Report Sixth Edition October 2003 · NREL-35119 Green Power Marketing in the United States: A Status Report Sixth Edition Lori Bird and Blair Swezey

  11. AGC-1 Pre-Irradiation Data Report Status

    SciTech Connect (OSTI)

    William Windes

    2011-08-01

    The Next Generation Nuclear Plant (NGNP) Graphite R&D program is currently measuring irradiated material property changes in several grades of nuclear graphite for predicting their behavior and operating performance within the core of new Very High Temperature Reactor (VHTR) designs. The Advanced Graphite Creep (AGC) experiment consisting of six irradiation capsules will generate this irradiated graphite performance data for NGNP reactor operating conditions. All samples in the experiment will be fully characterized before irradiation, irradiated in the Advanced Test Reactor (ATR), and then re-examined to determine the irradiation induced changes to key materials properties in the different graphite grades. The information generated during the AGC experiment will be utilized for NRC licensing of NGNP reactor designs, shared with international collaborators in the Generation IV Information Forum (GIF), and eventually utilized in ASME design code for graphite nuclear applications. This status report will describe the process the NGNP Graphite R&D program has developed to record the AGC1 pre-irradiation examination data.

  12. Assessment of the 296-S-21 Stack Sampling Probe Location

    SciTech Connect (OSTI)

    Glissmeyer, John A.

    2006-09-08

    Tests were performed to assess the suitability of the location of the air sampling probe on the 296-S-21 stack according to the criteria of ANSI N13.1-1999, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stacks and Ducts of Nuclear Facilities. Pacific Northwest National Laboratory conducted most tests on a 3.67:1 scale model of the stack. CH2MHill also performed some limited confirmatory tests on the actual stack. The tests assessed the capability of the air-monitoring probe to extract a sample representative of the effluent stream. The tests were conducted for the practical combinations of operating fans and addressed: (1) Angular Flow--The purpose is to determine whether the velocity vector is aligned with the sampling nozzle. The average yaw angle relative to the nozzle axis should not be more than 20. The measured values ranged from 5 to 11 degrees on the scale model and 10 to 12 degrees on the actual stack. (2) Uniform Air Velocity--The gas momentum across the stack cross section where the sample is extracted should be well mixed or uniform. The uniformity is expressed as the variability of the measurements about the mean, the coefficient of variance (COV). The lower the COV value, the more uniform the velocity. The acceptance criterion is that the COV of the air velocity must be ?20% across the center two-thirds of the area of the stack. At the location simulating the sampling probe, the measured values ranged form 4 to 11%, which are within the criterion. To confirm the validity of the scale model results, air velocity uniformity measurements were made both on the actual stack and on the scale model at the test ports 1.5 stack diameters upstream of the sampling probe. The results ranged from 6 to 8% COV on the actual stack and 10 to 13% COV on the scale model. The average difference for the eight runs was 4.8% COV, which is within the validation criterion. The fact that the scale model results were slightly higher than the actual stack suggests that the other test results on the scale model are conservative relative to the actual stack. (3) Uniform Concentration of Tracer Gases--A uniform contaminant concentration in the sampling plane enables the extraction of samples that represent the true concentration. This was first tested using a tracer gas to represent gaseous effluents. The fan is a good mixer, so injecting the tracer downstream of the fans provides worst-case results. The acceptance criteria are that (1) the COV of the measured tracer gas concentration is ?20% across the center two-thirds of the sampling plane and (2) at no point in the sampling plane does the concentration vary from the mean by >30%. The results on the scale model at the point simulating the sampling probe ranged from 0.3 to 6 %COV, and the maximum single point deviation from the mean was -10%. (4) Uniform Concentration of Tracer Particles--Uniformity in contaminant concentration at the sampling probe was further demonstrated using tracer particles large enough to exhibit inertial effects. Particles of 10-?m aerodynamic diameter were used. The acceptance criterion is that the COV of particle concentration is ?20% across the center two-thirds of the sampling plane. The scale model results ranged form 2 to 9%. Based on these tests, the location of the air sampling probe on the 296-S-21 stack meets the requirements of the ANSI/HPS N13.1-1999 standard.

  13. Results of toxicity tests and chemical analyses conducted on sediments collected from the TNX Outfall Delta Operable Unit, July 1999

    SciTech Connect (OSTI)

    Specht, W.L.

    2000-02-11

    In order to provide unit specific toxicity data that will be used to address critical uncertainty in the ecological risk assessment (ERA) for the TNX Outfall Delta Operable Unit (TNXOD OU), sediments were collected from eight locations in the Inner Swamp portion of the operable unit and two unit specific background locations. These samples were analyzed for total mercury, total uranium, and sediment toxicity.

  14. Joint Urban 2003: Study Overview And Instrument Locations

    SciTech Connect (OSTI)

    Allwine, K Jerry; Flaherty, Julia E.

    2006-08-16

    Quality-assured meteorological and tracer data sets are vital for establishing confidence that indoor and outdoor dispersion models used to simulate dispersal of potential toxic agents in urban atmospheres are giving trustworthy results. The U.S. Department of Defense-Defense Threat Reduction Agency and the U.S. Department of Homeland Security joined together to conduct the Joint Urban 2003 atmospheric dispersion study to provide this critically-needed high-resolution dispersion data. This major urban study was conducted from June 28 through July 31, 2003, in Oklahoma City, Oklahoma, with the participation of over 150 scientists and engineers from over 20 U.S. and foreign institutions. The Joint Urban 2003 lead scientist was Jerry Allwine (Pacific Northwest National Laboratory) who oversaw study design, logistical arrangements and field operations with the help of Joe Shinn (Lawrence Livermore National Laboratory), Marty Leach (Lawrence Livermore National Laboratory), Ray Hosker (Atmospheric Turbulence and Diffusion Division), Leo Stockham (Northrop Grumman Information Technology) and Jim Bowers (Dugway Proving Grounds). This report gives a brief overview of the field campaign, describing the scientific objectives, the dates of the intensive observation periods, and the instruments deployed. The data from this field study is available to the scientific community through an on-line database that is managed by Dugway Proving Ground. This report will be included in the database to provide its users with some general information about the field study, and specific information about the instrument coordinates. Appendix A of this document provides the definitive record of the instrument locations during this field campaign, and Appendix B lists all the study principal investigators and participants.

  15. Status of the Combined Third and Fourth NGNP Fuel Irradiations In the Advanced Test Reactor

    SciTech Connect (OSTI)

    S. Blaine Grover; David A. Petti; Michael E. Davenport

    2013-07-01

    The United States Department of Energy’s Next Generation Nuclear Plant (NGNP) Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is irradiating up to seven low enriched uranium (LEU) tri-isotopic (TRISO) particle fuel (in compact form) experiments in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory (INL). These irradiations and fuel development are being accomplished to support development of the next generation reactors in the United States. The experiments will be irradiated over the next several years to demonstrate and qualify new TRISO coated particle fuel for use in high temperature gas reactors. The goals of the experiments are to provide irradiation performance data to support fuel process development, to qualify fuel for normal operating conditions, to support development and validation of fuel performance and fission product transport models and codes, and to provide irradiated fuel and materials for post irradiation examination (PIE) and safety testing. The experiments, which will each consist of several independent capsules, will be irradiated in an inert sweep gas atmosphere with individual on-line temperature monitoring and control of each capsule. The sweep gas will also have on-line fission product monitoring on its effluent to track performance of the fuel in each individual capsule during irradiation. The first experiment (designated AGR-1) started irradiation in December 2006 and was completed in November 2009. The second experiment (AGR-2) started irradiation in June 2010 and is currently scheduled to be completed in September 2013. The third and fourth experiments have been combined into a single experiment designated (AGR-3/4), which started its irradiation in December 2011 and is currently scheduled to be completed in April 2014. Since the purpose of this combined experiment is to provide data on fission product migration and retention in the NGNP reactor, the design of this experiment is significantly different from the first two experiments, though the control and monitoring systems are extremely similar. The design of the experiment will be discussed followed by its progress and status to date.

  16. Stirling machine operating experience

    SciTech Connect (OSTI)

    Ross, B.; Dudenhoefer, J.E.

    1994-09-01

    Numerous Stirling machines have been built and operated, but the operating experience of these machines is not well known. It is important to examine this operating experience in detail, because it largely substantiates the claim that stirling machines are capable of reliable and lengthy operating lives. The amount of data that exists is impressive, considering that many of the machines that have been built are developmental machines intended to show proof of concept, and are not expected to operate for lengthy periods of time. Some Stirling machines (typically free-piston machines) achieve long life through non-contact bearings, while other Stirling machines (typically kinematic) have achieved long operating lives through regular seal and bearing replacements. In addition to engine and system testing, life testing of critical components is also considered. The record in this paper is not complete, due to the reluctance of some organizations to release operational data and because several organizations were not contacted. The authors intend to repeat this assessment in three years, hoping for even greater participation.

  17. MAPSAR Simulation in Brazil: Current StatusMAPSAR Simulation in Brazil: Current Status Dr. Waldir Renato Paradella

    E-Print Network [OSTI]

    MAPSAR MAPSAR Simulation in Brazil: Current StatusMAPSAR Simulation in Brazil: Current Status Dr #12;MAPSAR MAPSAR Simulation in Brazil (SARMAPSAR Simulation in Brazil (SAR--R99 Campaign)R99 Campaign

  18. Propane vehicles : status, challenges, and opportunities.

    SciTech Connect (OSTI)

    Rood Werpy, M.; Burnham, A.; Bertram, K.; Energy Systems

    2010-06-17

    Propane as an auto fuel has a high octane value and has key properties required for spark-ignited internal combustion engines. To operate a vehicle on propane as either a dedicated fuel or bi-fuel (i.e., switching between gasoline and propane) vehicle, only a few modifications must be made to the engine. Until recently propane vehicles have commonly used a vapor pressure system that was somewhat similar to a carburetion system, wherein the propane would be vaporized and mixed with combustion air in the intake plenum of the engine. This leads to lower efficiency as more air, rather than fuel, is inducted into the cylinder for combustion (Myers 2009). A newer liquid injection system has become available that injects propane directly into the cylinder, resulting in no mixing penalty because air is not diluted with the gaseous fuel in the intake manifold. Use of a direct propane injection system will improve engine efficiency (Gupta 2009). Other systems include the sequential multi-port fuel injection system and a bi-fuel 'hybrid' sequential propane injection system. Carbureted systems remain in use but mostly for non-road applications. In the United States a closed-loop system is used in after-market conversions. This system incorporates an electronic sensor that provides constant feedback to the fuel controller to allow it to measure precisely the proper air/fuel ratio. A complete conversion system includes a fuel controller, pressure regulator valves, fuel injectors, electronics, fuel tank, and software. A slight power loss is expected in conversion to a vapor pressure system, but power can still be optimized with vehicle modifications of such items as the air/fuel mixture and compression ratios. Cold start issues are eliminated for vapor pressure systems since the air/fuel mixture is gaseous. In light-duty propane vehicles, the fuel tank is typically mounted in the trunk; for medium- and heavy-duty vans and trucks, the tank is located under the body of the vehicle. Propane tanks add weight to a vehicle and can slightly increase the consumption of fuel. On a gallon-to-gallon basis, the energy content of propane is 73% that of gasoline, thus requiring more propane fuel to travel an equivalent distance, even in an optimized engine (EERE 2009b).

  19. Automated detection and location of indications in eddy current signals

    DOE Patents [OSTI]

    Brudnoy, David M. (Albany, NY); Oppenlander, Jane E. (Burnt Hills, NY); Levy, Arthur J. (Schenectady, NY)

    2000-01-01

    A computer implemented information extraction process that locates and identifies eddy current signal features in digital point-ordered signals, signals representing data from inspection of test materials, by enhancing the signal features relative to signal noise, detecting features of the signals, verifying the location of the signal features that can be known in advance, and outputting information about the identity and location of all detected signal features.

  20. 40 CFR 265 interim-status ground-water monitoring plan for the 2101-M pond

    SciTech Connect (OSTI)

    Chamness, M.A.; Luttrell, S.P.; Dudziak, S.

    1989-03-01

    This report outlines a ground-water monitoring plan for the 2101-M pond, located in the southwestern part of the 200-East Area on the Hanford Site in south-central Washington State. It has been determined that hazardous materials may have been discharged to the pond. Installation of an interim-status ground-water monitoring system is required under the Resource Conservation and Recovery Act to determine if hazardous chemicals are moving out of the pond. This plan describes the location of new wells for the monitoring system, how the wells are to be completed, the data to be collected, and how those data can be used to determine the source and extent of any ground-water contamination from the 2101-M pond. Four new wells are planned, one upgradient and three downgradient. 35 refs., 12 figs., 9 tabs.

  1. Compliance status report for the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    Not Available

    1994-03-31

    The US Department of Energy (DOE) is responsible for the disposition of transuranic (TRU) waste generated through national defense-related activities. Approximately 53,700 m{sup 2} of these wastes have been generated and are currently stored at government defense installations across the country. The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been sited and constructed to meet the criteria established by the scientific and regulatory community for the safe, long-term disposal of TRU and TRU-mixed wastes. This Compliance Status Report (CSR) provides an assessment of the progress of the WIPP Program toward compliance with long-term disposal regulations, set forth in Title 40 CFR 191 (EPA, 1993a), Subparts B and C, and Title 40 CFR {section}268.6 (EPA, 1993b), in order to focus on-going and future experimental and engineering activities. The CSR attempts to identify issues associated with the performance of the WIPP as a long-term repository and to focus on the resolution of these issues. This report will serve as a tool to focus project resources on the areas necessary to ensure complete, accurate, and timely submittal of the compliance application. This document is not intended to constitute a statement of compliance or a demonstration of compliance.

  2. Condensing Heating and Water Heating Equipment Workshop Location...

    Energy Savers [EERE]

    Condensing Heating and Water Heating Equipment Workshop Location: Washington Gas Light Appliance Training Facility 6801 Industrial Road Springfield, VA Date: October 9, 2014 Time:...

  3. Policy-aware sender anonymity in Location-based services

    E-Print Network [OSTI]

    Vyas, Avinash

    2011-01-01

    from attackers who (via hacking or subpoenas) gain access toagainst attackers who, via hacking or subpoenas, gain accessthe location database D 1 (via hacking or subpoena) and is “

  4. Located in historic Los Alamos, New Mexico against the backdrop...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Located in historic Los Alamos, New Mexico against the backdrop of the lush Jemez Mountains, Los Alamos National Laboratory (LANL) offers its education program participants...

  5. Attack-Resistant Location Estimation in Sensor (Revised August 2005)

    E-Print Network [OSTI]

    Ning, Peng

    role in many sensor network applications. Not only do applications such as environment monitoring and target tracking require sensors' location information to fulfill their tasks, but several fundamental

  6. Title 33 CFR 115 Bridge Locations and Clearances: Administrative...

    Open Energy Info (EERE)

    Title 33 CFR 115 Bridge Locations and Clearances: Administrative Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal...

  7. Alternative Fueling Station Locator App Provides Info at Your...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    stations that offer electricity, natural gas, biodiesel, E85, propane, or hydrogen. | Energy Department The Alternative Fueling Station Locator iPhone app helps you find...

  8. Identification of High Collision Concentration Locations Under Wet Weather Conditions

    E-Print Network [OSTI]

    Hwang, Taesung; Chung, Koohong; Ragland, David; Chan, Chin-Yao

    2008-01-01

    conducted under wet weather conditions. Observations fromLeahy, M. , and Suggett, J. Weather as a Chronic Hazard forLocations Under Wet Weather Conditions Taesung Hwang,

  9. Status of the Atlas Liquid Argon Calorimeter and its Performance after three years of LHC operation

    E-Print Network [OSTI]

    De La Torre, H; The ATLAS collaboration

    2013-01-01

    The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo-rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.4-4.9. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at 87 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three years period prior to first collisions in 2009, using cosmic rays and single LHC beam...

  10. Status of the ATLAS Liquid Argon Calorimeter; Performance after 2 years of LHC operation

    E-Print Network [OSTI]

    AbouZeid, H; The ATLAS collaboration

    2012-01-01

    The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo-rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.4-4.9. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at about 87 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three years period prior to first collisions in 2009, using cosmic rays and single LH...

  11. Status of the Atlas Liquid Argon Calorimeter and its Performance after two years of LHC operation

    E-Print Network [OSTI]

    AbouZeid, H; The ATLAS collaboration

    2012-01-01

    The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo-rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.4-4.9. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at 87 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three years period prior to first collisions in 2009, using cosmic rays and single LHC beam...

  12. Status of the Atlas Liquid Argon Calorimeter and its Performance after Three Years of LHC Operation

    E-Print Network [OSTI]

    Lampl, W; The ATLAS collaboration

    2013-01-01

    The ATLAS experiment is designed to study the proton-proton collisions pro- duced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo- rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.5-4.9. The electromagnetic calorimeters use lead as passive material and are characterised by an accordion geometry that allows a fast and uniform az- imuthal response without any gap. Copper and tungsten were chosen as pas- sive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical elec- trodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at approximately 89 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three-year period prior to first collisions in 2009, using cosmic ra...

  13. Status of the Atlas Liquid Argon Calorimeter and its Performance after two years of LHC operation

    E-Print Network [OSTI]

    AperioBella, L; The ATLAS collaboration

    2012-01-01

    The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo-rapidity region up to 3.2, as well as for hadronic calorimetry. The most forward part (pseudo-rapidity region 3.1-4.9) contains a electromagnetic section and two hadronic wheels. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at 87 K. After installation in 2004-2006, the calorimeters were extensively commissioned over t...

  14. Status of the Atlas Liquid Argon Calorimeter and its Performance after Three Years of LHC Operation

    E-Print Network [OSTI]

    Lampl, W; The ATLAS collaboration

    2013-01-01

    The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo- rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.5-4.9. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at approximately 89 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three-year period prior to first collisions in 2009, using cosmic rays and s...

  15. CERN's Linac4 H{sup -} sources: Status and operational results...

    Office of Scientific and Technical Information (OSTI)

    C. 1 more ; and others less + Show Author Affiliations CERN, 1211 Geneva 23 (Switzerland) Publication Date: 2015-04-08 OSTI Identifier: 22391413 Resource Type: Journal...

  16. CH Packaging Operations Manual

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2005-06-13

    This procedure provides instructions for assembling the CH Packaging Drum payload assembly, Standard Waste Box (SWB) assembly, Abnormal Operations and ICV and OCV Preshipment Leakage Rate Tests on the packaging seals, using a nondestructive Helium (He) Leak Test.

  17. Nuclear material operations manual

    SciTech Connect (OSTI)

    Tyler, R.P.

    1981-02-01

    This manual provides a concise and comprehensive documentation of the operating procedures currently practiced at Sandia National Laboratories with regard to the management, control, and accountability of nuclear materials. The manual is divided into chapters which are devoted to the separate functions performed in nuclear material operations-management, control, accountability, and safeguards, and the final two chapters comprise a document which is also issued separately to provide a summary of the information and operating procedures relevant to custodians and users of radioactive and nuclear materials. The manual also contains samples of the forms utilized in carrying out nuclear material activities. To enhance the clarity of presentation, operating procedures are presented in the form of playscripts in which the responsible organizations and necessary actions are clearly delineated in a chronological fashion from the initiation of a transaction to its completion.

  18. Protection Program Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-10-14

    This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE.

  19. Reservoir Operation in Texas 

    E-Print Network [OSTI]

    Wurbs, Ralph A.

    1985-01-01

    to store and to release or withdraw for flood control and various conservation purposes. The report is intended to provide a comprehensive, indepth description of how reservoirs are operated in Texas...

  20. Continuity of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-14

    The notice defines requirements and responsibilities for continuity of operations planning within the DOE to ensure the capability to continue essential Departmental functions across a wide range of all hazard emergencies. Does not cancel other directives.

  1. Operation Research Society 

    E-Print Network [OSTI]

    Unknown

    2011-08-17

    vehicles made in going through the arterial and the total stops at each intersection, were also used. Two operational regions were identified in this research. It was found that none of the strategies provided significant improvement over the others...

  2. Operations Security Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-04-30

    To establish policies, responsibilities and authorities for implementing and sustaining the Department of Energy (DOE) Operations Security (OPSEC) Program. Cancels DOE O 5632.3B. Canceled by DOE O 471.2 of 9-28-1995.

  3. Conduct of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 1, 6-25-13

  4. Conduct of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Admin Chg 2, dated 12-3-14, supersedes Admin Chg 1.

  5. The Dell operating model

    E-Print Network [OSTI]

    Paxton, Blaine Kermit

    2004-01-01

    Dell, Inc. is well known for its dramatic and continually improving operational performance in terms of unit cost, inventory level, production capacity, and labor efficiency. However, in late 2002, several members of Dell's ...

  6. Operating plan FY 1998

    SciTech Connect (OSTI)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  7. Cogeneration Operational Issues 

    E-Print Network [OSTI]

    Williams, M.

    1985-01-01

    important, however, are the operational Issues which impact the utility and the cogenerator. This paper addresses the utility perspective in regard to possible impact of cogeneration systems on utility service to other customer, safety and substation...

  8. Matrix product operator representations

    E-Print Network [OSTI]

    V. Murg; J. I. Cirac; B. Pirvu; F. Verstraete

    2008-04-24

    We show how to construct relevant families of matrix product operators in one and higher dimensions. Those form the building blocks for the numerical simulation methods based on matrix product states and projected entangled pair states. In particular, we construct translational invariant matrix product operators suitable for time evolution, and show how such descriptions are possible for Hamiltonians with long-range interactions. We illustrate how those tools can be exploited for constructing new algorithms for simulating quantum spin systems.

  9. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  10. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    1999-08-24

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  11. Turbine entrainment at six hydroelectric projects located on the AuSable River, Michigan

    SciTech Connect (OSTI)

    Matousek, J.A.; Metzger, S.G.; Wells, A.W. [Lawler, Matusky & Skelly Engineers, Pearl River, NY (United States)] [and others

    1995-12-31

    Turbine entrainment monitoring was conducted by Lawler, Matusky & Skelly Engineers for Consumers Power Company as part of relicensing activities at six hydroelectric projects located on Michigan`s AuSable River. The number and species of fish passing through the Francis turbines of the projects were determined through continuous hydroacoustic monitoring, with the transducers located upstream of the turbines, and through biweekly diel collections using partial-coverage turbine discharge draft tube nets. Although the nets were intended to supply information on species composition, both techniques were ultimately used to estimate turbine entrainment. Comparisons of entrainment abundance estimates were made among projects (location, physical equipment, and operating conditions) and between data collection techniques (hydroacoustics and nets). Species composition and size, based on the partial-coverage draft tube net collections, were also examined. The locations of the projects (along the lower section of the river) permitted evaluation of entrainment data related to morphometric characteristics of the respective impoundments, stream conditions, and water quality parameters.

  12. Smart Grid Status and Metrics Report Appendices

    SciTech Connect (OSTI)

    Balducci, Patrick J.; Antonopoulos, Chrissi A.; Clements, Samuel L.; Gorrissen, Willy J.; Kirkham, Harold; Ruiz, Kathleen A.; Smith, David L.; Weimar, Mark R.; Gardner, Chris; Varney, Jeff

    2014-07-01

    A smart grid uses digital power control and communication technology to improve the reliability, security, flexibility, and efficiency of the electric system, from large generation through the delivery systems to electricity consumers and a growing number of distributed generation and storage resources. To convey progress made in achieving the vision of a smart grid, this report uses a set of six characteristics derived from the National Energy Technology Laboratory Modern Grid Strategy. The Smart Grid Status and Metrics Report defines and examines 21 metrics that collectively provide insight into the grid’s capacity to embody these characteristics. This appendix presents papers covering each of the 21 metrics identified in Section 2.1 of the Smart Grid Status and Metrics Report. These metric papers were prepared in advance of the main body of the report and collectively form its informational backbone.

  13. Fossil energy waste management. Technology status report

    SciTech Connect (OSTI)

    Bossart, S.J.; Newman, D.A.

    1995-02-01

    This report describes the current status and recent accomplishments of the Fossil Energy Waste Management (FE WM) projects sponsored by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The primary goal of the Waste Management Program is to identify and develop optimal strategies to manage solid by-products from advanced coal technologies for the purpose of ensuring the competitiveness of advanced coal technologies as a future energy source. The projects in the Fossil Energy Waste Management Program are divided into three types of activities: Waste Characterization, Disposal Technologies, and Utilization Technologies. This technology status report includes a discussion on barriers to increased use of coal by-products. Also, the major technical and nontechnical challenges currently being addressed by the FE WM program are discussed. A bibliography of 96 citations and a list of project contacts is included if the reader is interested in obtaining additional information about the FE WM program.

  14. Smart Grid Status and Metrics Report

    SciTech Connect (OSTI)

    Balducci, Patrick J.; Weimar, Mark R.; Kirkham, Harold

    2014-07-01

    To convey progress made in achieving the vision of a smart grid, this report uses a set of six characteristics derived from the National Energy Technology Laboratory Modern Grid Strategy. It measures 21 metrics to provide insight into the grid’s capacity to embody these characteristics. This report looks across a spectrum of smart grid concerns to measure the status of smart grid deployment and impacts.

  15. ACRF Instrumentation Status and Information April 2009

    SciTech Connect (OSTI)

    JW Voyles

    2009-05-07

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

  16. Status Update: Closing Rocky Flats by 2006

    SciTech Connect (OSTI)

    Tuor, N.; Schubert, A.

    2003-02-25

    Safely closing Rocky Flats by December 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy (DOE), Kaiser-Hill and its team of subcontractors, the site's employees and taxpayers across the country. This paper will: provide a status of the Closure Project to date; describe important accomplishments of the past year; describe some of the closure-enhancing technologies enabling acceleration; and discuss the remaining challenges ahead.

  17. RESEARCH Open Access Longitudinal variability of time-location/activity

    E-Print Network [OSTI]

    Leistikow, Bruce N.

    /weekend), season (warm/cool), sex, employment status, and over the follow-up period. Results: As expected, day- base (CHAD), which houses time-activity data from a large number of studies, are single-day diaries of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/2.0), which permits

  18. Effects of thermocouple installation and location on fuel rod temperature measurements. [PWR; BWR

    SciTech Connect (OSTI)

    McCormick, R.D.

    1983-01-01

    This paper describes the results of analyses of nuclear fuel rod cladding temperature data obtained during in-reactor experiments under steady state and transient (simulated loss-of-coolant accident) operating conditions. The objective of the analyses was to determine the effect of thermocouple attachment method and location on measured thermal response. The use of external thermocouples increased the time to critical heat flux (CHF), reduced the blowdown peak temperature, and enhanced rod quench. A comparison of laser welded and resistance welded external thermocouple responses showed that the laser welding technique reduced the indicated cladding steady state temperatures and provided shorter time-to-CHF. A comparison of internal welded and embedded thermocouples indicated that the welded technique gave generally unsatisfactory cladding temperature measurements. The embedded thermocouple gave good, consistent results, but was possibly more fragile than the welded thermocouples. Detailed descriptions of the thermocouple designs, attachment methods and locations, and test conditions are provided.

  19. A Location Management System for Destination Prediction from Smartphone Sensors

    E-Print Network [OSTI]

    Cho, Sung-Bae

    the current sensor values. The proposed system consists of five modules. Three modules perform to manage collection, the system generates new information. 2) Location extraction: It extacts location, which prediction method using linear regression, logistic regression and random forest [5]. It uses the information

  20. Models for Offender Target Location Selection with Explicit Dependency Structures

    E-Print Network [OSTI]

    O'Leary, Michael

    Models for Offender Target Location Selection with Explicit Dependency Structures Mike O'Leary April 30 - May 1, 2012 O'Leary & Tucker (Towson University) Target Location Selection QMDNS 2012 1 / 54 in this study We thank Phil Canter from the Baltimore County Police Department for his assistance. O'Leary

  1. A MODELING APPROACH FOR LOCATING LOGISTICS PLATFORMS FOR FAST PARCEL

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 29 A MODELING APPROACH FOR LOCATING LOGISTICS PLATFORMS FOR FAST PARCEL DELIVERY IN URBAN AREAS for optimizing, in a sustainable way (i.e. economical, eco-friendly and societal), the location of logistics has a logistics platform right in its centre (ARENC: 41362 m2 of warehouses and offices

  2. Facility Location with Hierarchical Facility Costs Zoya Svitkina #

    E-Print Network [OSTI]

    Tardos, Ã?va

    Facility Location with Hierarchical Facility Costs Zoya Svitkina # â?? Eva Tardos + Abstract We consider the facility location problem with hierarchi­ cal facility costs, and give a (4 installation costs. Shmoys, Swamy and Levi [13] gave an approxi­ mation algorithm for a two­level version

  3. Facility Location Under Uncertainty: A Review Lawrence V. Snyder

    E-Print Network [OSTI]

    Snyder, Larry

    for researchers in both the logistics and stochastic/robust optimization com- munities. Indeed, a large number in facility location are not available, we provide examples from the more general logistics literature. 1 Introduction Facility location decisions are costly and difficult to reverse, and their impact spans a long

  4. EIS-0238: Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to continue operating the Los Alamos National Laboratory (LANL) located in Los Alamos County, in north-central New Mexico. DOE...

  5. A Systems Approach to Optimize the Operation of a Refrigeration Unit at a Chemical Plant 

    E-Print Network [OSTI]

    Papar, R.; Zugibe, K.; Heitler, J.

    2005-01-01

    This paper focuses on the ongoing system level analysis and the optimization results of two steamturbine driven refrigeration units at the Dow Chemical company Peroxymerics (PXC) plant located at St. Charles Operations in Hahnville, LA. Six-sigma...

  6. Tampa Electric Company Polk Power Station IGCC Project -- Project status

    SciTech Connect (OSTI)

    Berry, T.E.

    1998-12-31

    The Tampa Electric Company Polk Power Station is a nominal 25 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located southeast of Tampa in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round III award. The Polk Power Station uses oxygen-blown, entrained-flow coal gasification technology licensed from Texaco Development Corporation in conjunction with a General Electric combined cycle with an advanced combustion turbine. This IGCC configuration demonstrates significant reductions of SO{sub 2} and NOx emissions when compared to existing and future conventional coal-fired power plants. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. It was placed into commercial operation on September 30, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. The presentation features an up-to-the-minute update of actual performance parameters achieved by the Polk Power Station. These parameters include overall capacity, heat rate, and availability. Tests of four alternate feedstocks were conducted, and the resulting performance is compared to that achieved on their base coal. This paper also provides an update of the general operating experiences and shutdown causes of the gasification facility throughout 1997. Finally, the future plans for improving the reliability and efficiency of the Unit will be addressed, as well as plans for future additional alternate fuel test burns.

  7. Tampa Electric Company, Polk Power Station IGCC Project: Project Status

    SciTech Connect (OSTI)

    Berry, T.E.; Shelnut, C.A.; McDaniel, J.E.

    1999-07-01

    Over the last ten years, Tampa Electric Company (TEC) has taken the Polk Power Station from a concept to a reality. The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy Clean Coal Technology Program pursuant to a Round III award. The Polk Power Station achieved first fire of the gasification system on schedule in mid-July, 1996. It was placed in commercial operation on September 30, 1996. Since start-up in July, 1996, significant advances have occurred in the design and operation of the entire IGCC train. This presentation will feature an up-to-the-minute update of actual performance parameters achieved by the Polk Power Station. These parameters include overall capacity, heat rate, and availability. Several different coal feedstocks have been tested and the resulting performance will be compared to that achieved on the base coal. This paper also provides an update of the general operating experiences and shutdown causes of the gasification facility. Finally, the future plans for improving the reliability and efficiency of the Unit will be addressed, as well as plans for future additional alternate fuel test burns.

  8. Location Update Accuracy in Human Tracking system using Zigbee modules

    E-Print Network [OSTI]

    Amutha, B

    2009-01-01

    A location and tracking system becomes very important to our future world of pervasive computing. An algorithm for accurate location information is being incorporated in the human walking model and in the blind human walking model. We want to implement an accurate location tracking mechanism using Zigbee along with GPS, we have incorporated Markov chain algorithm for establishing accuracy. Normal Human and blind human walking steps were actually taken in the known environment within our campus and the Markov chain algorithm was used for smoothening the stepwise variation in location updates. A comparison module is also implemented to show the difference between normal human and blind human walking step variations. This accuracy is used for designing a blind tracking device so that the device can be used by the blind for finding the path without obstacles. We present a system level approach to localizing and tracking Human and blind users on a basis of different sources of location information [GPS plus Zigbee...

  9. Annual status report on the Uranium Mill Tailings Remedial Action Program

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    This fourteenth annual status report for the Uranium Mill Tailings Remedial Action (UMTRA) Project Office summarizes activities of the Uranium Mill Tailings Remedial Action Surface (UMTRA-Surface) and Uranium Mill Tailings Remedial Action Groundwater (UMTRA-Groundwater) Projects undertaken during fiscal year (FY) 1992 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1993 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604. The DOE will continue to submit annual reports to DOE-Headquarters, the states, tribes, and local representatives through Project completion in order to inform the public of the yearly Project status. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive material (RRM) located on the inactive uranium processing sites in a safe and environmentally sound manner, and to minimize or eliminate potential health hazards. Commercial and residential properties near designated processing sites that are contaminated with material from the sites, herein referred to as ``vicinity properties (VP),`` are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated VPs located in 10 states, and the VPs associated with the Edgemont, South Dakota, uranium mill currently owned by the Tennessee Valley Authority (TVA) (Figure A.1, Appendix A).

  10. Collaborating at a distance: operations centres, tools, and trends

    SciTech Connect (OSTI)

    Gottschalk, Erik E.; /Fermilab

    2009-05-01

    Successful operation of the LHC and its experiments is crucial to the future of the worldwide high-energy physics program. Remote operations and monitoring centres have been established for the CMS experiment in several locations around the world. The development of remote centres began with the LHC{at}FNAL ROC and has evolved into a unified approach with distributed centres that are collectively referred to as 'CMS Centres Worldwide'. An overview of the development of remote centres for CMS will be presented, along with a synopsis of collaborative tools that are used in these centres today and trends in the development of remote operations capabilities for high-energy physics.

  11. About APPLE II Operation

    SciTech Connect (OSTI)

    Schmidt, T.; Zimoch, D.

    2007-01-19

    The operation of an APPLE II based undulator beamline with all its polarization states (linear horizontal and vertical, circular and elliptical, and continous variation of the linear vector) requires an effective description allowing an automated calculation of gap and shift parameter as function of energy and operation mode. The extension of the linear polarization range from 0 to 180 deg. requires 4 shiftable magnet arrrays, permitting use of the APU (adjustable phase undulator) concept. Studies for a pure fixed gap APPLE II for the SLS revealed surprising symmetries between circular and linear polarization modes allowing for simplified operation. A semi-analytical model covering all types of APPLE II and its implementation will be presented.

  12. Chapter 10: FTU Operation

    SciTech Connect (OSTI)

    Angelini, B.M.; Apicella, M.L.; Buceti, G.; Centioli, C.; Crisanti, F.; Iannone, F.; Mazza, G.; Mazzitelli, G.; Panella, M.; Vitale, V.

    2004-05-15

    Some specific points of the Frascati Tokamak Upgrade (FTU) operation are presented for plasma performance as well as for the machine availability and the development of new tools needed to operate in a complex scenario needed for tokamak research. The different techniques adopted for wall conditioning of the FTU are reviewed. Plasmas with low Z{sub eff} have been achieved including those at low density and high additional heating power. The obtained experimental results are discussed in terms of better operation and plasma performance achieved. As with any other large - and thus long-lasting - experiments, a mixture of old and new technological solutions inserted in an open source framework characterizes the FTU data control and acquisition systems. We give some information on the original architecture and try to detail its current state. The high level of reliability presently achieved is discussed.

  13. Math 577 Computational Mathematics I Time and Location: 1:50--3:05 TR, Location E1 242

    E-Print Network [OSTI]

    Fasshauer, Greg

    Math 577 ­ Computational Mathematics I Time and Location: 1:50--3:05 TR, Location E1 242 Instructor: Mathematics of Scientific Computing, 3rd Ed, Brooks/Cole (2002), ISBN 0-534-38905-8. Other required material numerical methods for computing eigenvalues and their derivation. 4. Students will understand the basic

  14. Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2002-2003 Annual Report.

    SciTech Connect (OSTI)

    Connor, Jason M.; McLellan, Jason G.; Butler, Chris

    2006-02-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

  15. Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2001 Annual Report.

    SciTech Connect (OSTI)

    Connor, Jason M.; McLellan, Jason G.; O'Connor, Dick

    2003-01-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power Planning Council (NPPC). The NPPC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPPC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area and the Columbia Basin Blocked Area Management Plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of seven streams and four lakes on the Spokane Indian Reservation were completed by 2000. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in southern Pend Oreille County, and water bodies within and near the Spokane Indian Reservation were conducted in 2001. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

  16. Anywhere But Here: An Introduction to State Control of Hazardous Waste Facility Location

    E-Print Network [OSTI]

    Tarlock, Dan A.

    1981-01-01

    State Control Of Hazardous- Waste Facility Location A. Danautonomy over the location of hazardous-waste managementa hazardous-waste facility-siting process is the location of

  17. OPERATIONAL RISK RODNEY COLEMAN

    E-Print Network [OSTI]

    Coleman, Rodney

    the business environment. These include terrorism, civil unrest, systems fail- ings including hacking RISKS ARISING FROM BUSINESS ACTIVITY You lose business opportunities while your computer systems a business beyond those from its money-making activities. This is operational risk, often shortened to oprisk

  18. Concept of Operations: Essence

    SciTech Connect (OSTI)

    Hutton, William J.

    2014-04-01

    This concept of operations is designed to give the reader a brief overview of the National Rural Electric Cooperative Association’s Essence project and a description of the Essence device design. The data collected by the device, how the data are used, and how the data are protected are also discussed in this document.

  19. NUCLEAR PLANT OPERATIONS AND

    E-Print Network [OSTI]

    Demazière, Christophe

    NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: moderator temper ature coefficient, reactivity co reactor Unit 4 of the Ringhals Nuclear Power Plant (Sweden) during fuel cycle 16 is analyzed of Reactor Physics SE-41296 Gothenburg, Sweden GABOR PÓR Budapest University of Technology and Economics H

  20. NUCLEAR PLANT OPERATIONS AND

    E-Print Network [OSTI]

    Pázsit, Imre

    NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: neutron flux, cur- rent noise, vibration diagnostics, localization algorithm LOCALIZATION OF A VIBRATING CONTROL ROD PIN IN PRESSURIZED WATER REACTORS USING. The possibility of the localization of a vibrating control rod pin in a pressurized water reactor control assembly

  1. NUCLEAR PLANT OPERATIONS AND

    E-Print Network [OSTI]

    Pázsit, Imre

    NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: moderator temper- ature coefficient, reactivity co reactor Unit 4 of the Ringhals Nuclear Power Plant (Sweden) during fuel cycle 16 is analyzed of Reactor Physics SE-41296 Gothenburg, Sweden GABOR PÓR Budapest University of Technology and Economics H

  2. Conduct of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 1, dated 6-25-13, cancels DOE O 422.1. Certified 12-3-14.

  3. Mathematical Jacobi Operators

    E-Print Network [OSTI]

    Teschl, Gerald

    -LATEX, PicTEX, and Makeindex. Version: November 7, 2012. Library of Congress Cataloging-in-Publication Data CIP Copying and reprinting. Individual readers of this publication, and nonprofit libraries acting-adjoint operators and develop discrete Weyl-Titchmarsh-Kodaira theory, covering all classical aspects like Weyl m-functions

  4. EMSL Operations Manual

    SciTech Connect (OSTI)

    Foster, Nancy S.

    2009-06-18

    This manual is a general resource tool to assist EMSL users and Laboratory staff within EMSL locate official policy, practice and subject matter experts. It is not intended to replace or amend any formal Battelle policy or practice. Users of this manual should rely only on Battelle’s Standard Based Management System (SBMS) for official policy. No contractual commitment or right of any kind is created by this manual. Battelle management reserves the right to alter, change, or delete any information contained within this manual without prior notice.

  5. EMSL Operations Manual

    SciTech Connect (OSTI)

    Foster, Nancy S.

    2009-03-25

    This manual is a general resource tool to assist EMSL users and Laboratory staff within EMSL locate official policy, practice and subject matter experts. It is not intended to replace or amend any formal Battelle policy or practice. Users of this manual should rely only on Battelle’s Standard Based Management System (SBMS) for official policy. No contractual commitment or right of any kind is created by this manual. Battelle management reserves the right to alter, change, or delete any information contained within this manual without prior notice.

  6. The CAST experiment: status and perspectives

    E-Print Network [OSTI]

    F. J. Iguaz

    2011-10-10

    The status of the solar axion search with the CERN Axion Solar Telescope (CAST) will be discussed. Results from the first part of CAST phase II where the magnet bores were filled with 4He gas at variable pressure in order to scan axion masses up to 0.4 eV will be presented. From the absence of excess X-rays when the magnet was pointing to the Sun, we set a typical upper limit on the axion-photon coupling of g CAST phase II. Expectations for sensibilities will be given. Near future perspectives as well as more long term options for a new helioscope experiment will be evoked.

  7. TRAC code development status and plans

    SciTech Connect (OSTI)

    Spore, J.W.; Liles, D.R.; Nelson, R.A.; Dotson, P.J.; Steinke, R.G.; Knight, T.D.; Henninger, R.J.; Martinez, V.; Jenks, R.P.; Cappiello, M.W.

    1986-01-01

    This report summarizes the characteristics and current status of the TRAC-PF1/MOD1 computer code. Recent error corrections and user-convenience features are described, and several user enhancements are identified. Current plans for the release of the TRAC-PF1/MOD2 computer code and some preliminary MOD2 results are presented. This new version of the TRAC code implements stability-enhancing two-step numerics into the 3-D vessel, using partial vectorization to obtain a code that has run 400% faster than the MOD1 code.

  8. Current Status of Concentrator Photovoltaic (CPV) Technology

    SciTech Connect (OSTI)

    Philipps, S. P.; Bett, A. W.; Horowitz, K.; Kurtz, S.

    2015-01-01

    This report describes the current status of the market and technology for concentrator photovoltaic (CPV) cells and modules. Significant progress in CPV has been achieved, including record efficiencies for modules (36.7%) and cells (46%), as well as growth of large field installations in recent years. CPV technology may also have the potential to be cost-competitive on a levelized cost of energy (LCOE) basis in regions of high direct normal irradiance (DNI). The study includes an overview of all installations larger than 1 MW, information on companies currently active in the CPV field, efficiency data, and estimates of the LCOE in different scenarios.

  9. Status and Challenges for FCC-ee

    E-Print Network [OSTI]

    Benedikt, Michael; Zimmermann, Frank; Bogomyagkov, Anton; Levichev, Eugene; Migliorati, Mauro; Wienands, Uli

    2015-01-01

    We report the design status and beam dynamics challenges for the electron-positron branch of the Future Circular Collider (FCC) study, as of August 2015. After recalling motivation and physics requirements for the FCC-ee, we briefly discuss configurations and parameters, collider layout, the superconducting RF system, possible staging scenarios, final-focus optics, interaction-region (IR) issues, machine detector interface and IR synchrotron radiation, dynamic aperture, beam-beam effects, top-up injection, mono-chromatization option, impedances, instabilities, energy calibration and polarization, and SuperKEKB as a key demonstrator, before presenting conclusions and outlook.

  10. Property:Project Status | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource HistoryPotentialRuralUtilityScalePVGeneration Jump to: navigation,Power Transfer MethodCityResourceStatus

  11. ARM - Value-Added Product Status Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Comments?govInstrumentsnoaacrnBarrow,ProductstoacessProductsrlprofrlprofmerge1turn DocumentationSuggestionStatus

  12. ARM - Value-Added Products - Status

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Comments?govInstrumentsnoaacrnBarrow,ProductstoacessProductsrlprofrlprofmerge1turn DocumentationSuggestionStatus-

  13. Status of Laboratory Goals | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effect Photovoltaics -7541C.3X-rays IlluminateStateIntentchange.Status of Laboratory

  14. Operations and Maintenance Program Structure

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

  15. The Asia Pacific LNG trade: Status and technology development

    SciTech Connect (OSTI)

    Hovdestad, W.R.

    1995-10-01

    The Asia Pacific Region is experiencing a period of sustained economic expansion. Economic growth has led to an increasing demand for energy that has spurred a rapid expansion of baseload liquefied natural gas (LNG) facilities in this region. This is illustrated by the fact that seven of the ten baseload facilities in existence provide LNG for markets in the Asia Pacific region. With the three exceptions having been initially commissioned in 1972 and earlier, it is fair to observed that most advances in LNG technology have been developed and applied for this market. The paper presents the current status and identified future trends for the Asia Pacific LNG trade. Technology development in terms of application to onstream production, processing and transportation facilities, including LNG tankers, is presented. The potential of future advances to applied technology and operational practices to improve the cost-effectiveness of new and existing facilities is discussed. Current design data and methods as actually used are examined in terms of identifying where fundamental research and basic physical data are insufficient for optimization purposes. These findings are then summarized and presented in terms of the likely evolution of future and existing LNG projects in the Asia Pacific region.

  16. US/UK Loan Account Project Status PMOD477

    SciTech Connect (OSTI)

    Stevens, Patrice A.

    2012-07-12

    The viewgraphs describe the status of PMOD477 for LANL. The meeting will occur at DOE-HQ with NA-11 and Military Applications personnel in attendance. Serves to repatriate material with a balance to zero by December 2012. Phase 1 -- Establish formality of operations for War Reserve (WR): Complete surrogate taskings to A90 through a Materials Channel and perform US/UK lessons learned; Complete the US/UK agreed Quality Acceptance Plan, Materials Plan, Shipping procedure, and establish the formal UK/US point of contacts. Phase 2 -- Metal Manufacture (WR): Process material and store material as electrorefined metal (ER) rings, with initial assay and isotopic analysis, prior to manufacturing. Material is cast into accepted configuration and appropriate acceptance document for each aliquot will be generated. Phase 3 -- Intermediate Material Manufacture, Packaging and Shipping (WR): Continue processing of the material in accepted configuration with appropriate acceptance documentation for each aliquot. Provide an initial tasking of the material owed to UK including appropriate quality acceptance documentation. Phase 4 -- Complete Tasking (WR). Phase 5 -- Residue Processing (Non-WR): Complete processing of residue material and waste into accepted configuration with appropriate acceptance document for disposal.

  17. An Information Theoretic Location Verification System for Wireless Networks

    E-Print Network [OSTI]

    Yan, Shihao; Nevat, Ido; Peters, Gareth W

    2012-01-01

    As location-based applications become ubiquitous in emerging wireless networks, Location Verification Systems (LVS) are of growing importance. In this paper we propose, for the first time, a rigorous information-theoretic framework for an LVS. The theoretical framework we develop illustrates how the threshold used in the detection of a spoofed location can be optimized in terms of the mutual information between the input and output data of the LVS. In order to verify the legitimacy of our analytical framework we have carried out detailed numerical simulations. Our simulations mimic the practical scenario where a system deployed using our framework must make a binary Yes/No "malicious decision" to each snapshot of the signal strength values obtained by base stations. The comparison between simulation and analysis shows excellent agreement. Our optimized LVS framework provides a defence against location spoofing attacks in emerging wireless networks such as those envisioned for Intelligent Transport Systems, wh...

  18. Healthcare Facility Location and Capacity Configuration under Stochastic Demand 

    E-Print Network [OSTI]

    Han, Xue

    2014-12-18

    This dissertation addresses two topics. The first topic is strategic dynamic supply chain reconfiguration (DSCR) problem, in which the proposed capacity configuration network is employed in the second topic: healthcare facility location and capacity...

  19. Location-based information system for open spaces 

    E-Print Network [OSTI]

    Tejavanija, Kampanart

    2004-11-15

    positioning system (GPS) in providing location information, it is expected that this technology could be utilized to control and improve building construction and facility management productivity within building interior spaces as well. However, GPS cannot...

  20. Object Co-location and Memory Reuse for Java Programs

    E-Print Network [OSTI]

    Lau, Francis C.M.

    : Memory allocator, garbage collector, mutator, Java, object co- location, memory reuse ACM Reference of a runtime system becomes increasingly signif- icant [Sun Microsystems 2003]. Our second goal is to find

  1. Network Based Approaches for Clustering and Location Decisions 

    E-Print Network [OSTI]

    Verma, Anurag

    2012-10-19

    , which is critical to the quality of service provided in a large scale emergency like an earthquake. In the existing literature, large scale emergency facility location models have either assumed that disaster response facilities will always...

  2. MARVEL: A System for Recognizing World Locations with Stereo Vision

    E-Print Network [OSTI]

    Braunegg, David Jerome

    1990-06-01

    To use a world model, a mobile robot must be able to determine its own position in the world. To support truly autonomous navigation, I present MARVEL, a system that builds and maintains its own models of world locations ...

  3. A Geographic Information Retrieval Approach to Locate Pharmacies on Duty

    E-Print Network [OSTI]

    Rosso, Paolo

    Geographic Information Retrieval (GIR), Geographic Information Systems (GIS), Toponym Disambiguation 1 disciplines, in particular geographic information retrieval and geographical information systems, which playedGIRPharma: A Geographic Information Retrieval Approach to Locate Pharmacies on Duty Francisco M

  4. Infill location determination and assessment of corresponding uncertainty 

    E-Print Network [OSTI]

    Senel, Ozgur

    2009-05-15

    , generated probabilistic distributions of incremental field production and, finally, used descriptive statistical analysis to evaluate results. I quantified the uncertainty associated with infill location selection in terms of incremental field production...

  5. Identifying Infill Locations and Underperformer Wells in Mature Fields using

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    field. Identify opportunities in mature fields: Sweet spots for infill drilling. Underperformer wellsIdentifying Infill Locations and Underperformer Wells in Mature Fields using Monthly Production wells rather than the entire field. #12;Introduction Objective Methodology Results Conclusion Objective

  6. SOIL MICROBIOLOGY Resource Use of Soilborne Streptomyces Varies with Location,

    E-Print Network [OSTI]

    Thomas, David D.

    SOIL MICROBIOLOGY Resource Use of Soilborne Streptomyces Varies with Location, Phylogeny in prairie soils. Resource use patterns were highly variable among Streptomyces isolates and were soils less than 1 m apart differed significantly in their ability to use resources, indicating

  7. Colorado CRS 29-20-108, Location, Construction, or Improvement...

    Open Energy Info (EERE)

    Colorado CRS 29-20-108, Location, Construction, or Improvement of Major Electrical or Natural Gas Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  8. Identification of critical locations across multiple infrastructures for terrorist actions

    E-Print Network [OSTI]

    Patterson, Sean A. (Sean Albert), 1981-

    2005-01-01

    This paper discusses a possible approach to ranking geographic regions that can influence multiple infrastructures. Once ranked, decision makers can determine whether these regions are critical locations based on their ...

  9. The Value of Flexibility in Robust Location-Transportation Problem

    E-Print Network [OSTI]

    2014-11-24

    Facility location decisions play a critical role in transportation planning. ... little is known about future demand, robust optimization, namely using a budgeted ... acterized by Dj. The total profit generated by the company is computed based on

  10. Short & long run transmission incentives for generation location

    E-Print Network [OSTI]

    Turvey, Ralph

    2006-01-01

    This paper is about one aspect of Britain's electricity trading system, its advantages and its weaknesses concerning the incentives it provides or fails to provide for the location of generation. (Similar considerations ...

  11. NMOCD - Form G-102 - Geothermal Resources Well Location and Acreage...

    Open Energy Info (EERE)

    NMOCD - Form G-102 - Geothermal Resources Well Location and Acreage Dedication Plat Jump to: navigation, search OpenEI Reference LibraryAdd to library General: NMOCD - Form G-102 -...

  12. Remotely operated pipe connector

    DOE Patents [OSTI]

    Josefiak, Leonard J. (Scotia, NY); Cramer, Charles E. (Guilderford, NY)

    1988-01-01

    An apparatus for remotely assembling and disassembling a Graylock type coctor between a pipe and a closure for the pipe includes a base and a receptacle on the base for the closure. The pipe is moved into position vertically above the closure by a suitable positioning device such that the flange on the pipe is immediately adjacent and concentric with the flange on the closure. A moving device then moves two semicircular collars from a position free of the closure to a position such that the interior cam groove of each collar contacts the two flanges. Finally, a tensioning device automatically allows remote tightening and loosening of a nut and bolt assembly on each side of the collar to cause a seal ring located between the flanges to be compressed and to seal the closure. Release of the pipe and the connector is accomplished in the reverse order. Preferably, the nut and bolt assembly includes an elongate shaft portion on which a removable sleeve is located.

  13. Location of the solar dynamo and near-surface shear

    E-Print Network [OSTI]

    Axel Brandenburg

    2005-12-29

    The location of the solar dynamo is discussed in the context of new insights into the theory of nonlinear turbulent dynamos. It is argued that, from a dynamo-theoretic point of view, the bottom of the convection zone is not a likely location and that the solar dynamo may be distributed over the convection zone. The near surface shear layer produces not only east-west field alignment, but it also helps the dynamo disposing of its excess small scale magnetic helicity.

  14. Predicting threshold and location of laser damage on optical surfaces

    DOE Patents [OSTI]

    Siekhaus, Wigbert (Berkeley, CA)

    1987-01-01

    An apparatus useful in the prediction of the damage threshold of various optical devices, the location of weak spots on such devices and the location, identification, and elimination of optical surface impurities comprising, a focused and pulsed laser, an photo electric detector/imaging means, and a timer. The weak spots emit photoelectrons when subjected to laser intensities that are less than the intensity actually required to produce the damage. The weak spots may be eliminated by sustained exposure to the laser beam.

  15. Chapter 1: Operating System Models 1 Operating System Models

    E-Print Network [OSTI]

    Melbourne, University of

    Chapter 1: Operating System Models 1 2 Operating System Models 2.1 Introduction Over the past several years, a number of trends affecting operating system design are witnessed and foremost among them is a move towards modularity. Operating systems such as Microsofts Windows, IBMs OS/2, C-DACs PARAS

  16. Rtrage zum Operations Research Kolloquium des Instituts fur Operations Research

    E-Print Network [OSTI]

    Stein, Oliver

    V O Rtr¨age zum Operations Research Kolloquium des Instituts f¨ur Operations Research Zeit conditions for their stability. Die Vortr¨age zum Operations Research wenden sich an alle Interessierten! Ab 17:00 Uhr ist am Institut f¨ur Operations Research (Geb¨aude 20.13, Raum 104) Gelegenheit zu einem

  17. Status of the visible Free-Electron Laser at the Brookhaven Accelerator Test Facility

    SciTech Connect (OSTI)

    Batchelor, K.; Ben-Zvi, I.; Fernow, R.C.; Fisher, A.S.; Friedman, A.; Gallardo, J.; Ingold, G.; Kirk, H.; Kramer, S.; Lin, L.; Rogers, J.T.; Sheehan, J.F.; van Steenbergen, A.; Woodle, M.; Xie, J.; Yu, L.H.; Zhang, R. ); Bhowmik, A. . Rocketdyne Div.)

    1991-01-01

    The 500 nm Free-Electron Laser (ATF) of the Brookhaven National Laboratory is reviewed. We present an overview of the ATF, a high-brightness, 50-MeV, electron accelerator and laser complex which is a users' facility for accelerator and beam physics. A number of laser acceleration and FEL experiments are under construction at the ATF. The visible FEL experiment is based on a novel superferric 8.8 mm period undulator. The electron beam parameters, the undulator, the optical resonator, optical and electron beam diagnostics are discussed. The operational status of the experiment is presented. 22 refs., 7 figs.

  18. Strategic Analysis of the Global Status of Carbon Capture and...

    Open Energy Info (EERE)

    Strategic Analysis of the Global Status of Carbon Capture and Storage (CCS): Country Studies, United Arab Emirates Jump to: navigation, search Tool Summary LAUNCH TOOL Name:...

  19. Green Power Marketing in the United States: A Status Report ...

    Energy Savers [EERE]

    Codes, Standards & Utility Policies Subprogram Soft Costs Author National Renewable Energy Laboratory Green Power Marketing in the United States: A Status Report (11th...

  20. Sample Status Inquiry Letter Ready Reference F-9

    E-Print Network [OSTI]

    Sample Status Inquiry Letter Ready Reference F-9 College of Engineering, Architecture & Technology Career Services Oklahoma State University College of College of Engineering, Architecture & Technology

  1. Geothermal Heat Pumps: Market Status, Barriers to Adoption, and...

    Open Energy Info (EERE)

    Geothermal Heat Pumps: Market Status, Barriers to Adoption, and Actions to Overcome Barriers Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Geothermal Heat Pumps:...

  2. COSMIC MICROWAVE BACKGROUND -- PRESENT STATUS AND FUTURE PROSPECTS

    E-Print Network [OSTI]

    Muller, Richard A.

    2011-01-01

    December 14-20, 1978 COSMIC MICROWAVE BACKGROUND — PRESENTis OTUMHPSB LBL-8799 COSMIC MICROWAVE BACKGROUND ~ PRESENT> lirtLU COSMIC MICROWAVE BACKGROUND — PRESENT STATUS AND

  3. Updated Appendices to the Status of Environmental Management...

    Office of Environmental Management (EM)

    the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War Report to Congress Updated Appendices to the Status of Environmental Management...

  4. Geophysics, Geology and Geothermal Leasing Status of the Lightning...

    Open Energy Info (EERE)

    Leasing Status of the Lightning Dock KGRA, Animas Valley, New Mexico Author C. Smith Published New Mexico Geological Society Guidebook, 1978 DOI Not Provided Check for DOI...

  5. Status of Segmented Element Thermoelectric Generator for Vehicle...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Segmented Element Thermoelectric Generator for Vehicle Waste Heat Recovery Status of Segmented Element Thermoelectric Generator for Vehicle Waste Heat Recovery Discusses progress...

  6. Fusion Nuclear Science and Technology Program - Status and plans...

    Office of Environmental Management (EM)

    plans for tritium research Fusion Nuclear Science and Technology Program - Status and plans for tritium research Presentation from the 35th Tritium Focus Group Meeting held in...

  7. Panel 1, Hawaii Hydrogen Projects Status & Lessons Learned

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Projects Status & Lessons Learned Mitch Ewan Hydrogen Systems Program Manager Hawaii Natural Energy Institute School of Ocean Earth Science and Technology University of...

  8. Status and Prospects of the Global Automotive Fuel Cell Industry...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Prospects of the Global Automotive Fuel Cell Industry and Plans for Deployment of Fuel Cell Vehicles and Hydrogen Refueling Infrastructure Status and Prospects of the Global...

  9. Status of the Application of Thermoelectric Technology in Vehicles...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Application of Thermoelectric Technology in Vehicles Status of the Application of Thermoelectric Technology in Vehicles 2004 Diesel Engine Emissions Reduction (DEER) Conference...

  10. Current Status of the high enthalpy conventional geothermal fields...

    Open Energy Info (EERE)

    Current Status of the high enthalpy conventional geothermal fields in Europe and the potential perspectives for their exploitation in terms of EGS Jump to: navigation, search...

  11. Random Operator Compressions

    E-Print Network [OSTI]

    Stephen Ng; Meg Walters

    2014-09-19

    Let $A$ be a Hermitian operator of order $n$. We show that for $k\\leq n$ sufficiently large, the eigenvalues of a compression of $A$ to a $k$-dimensional subspace are almost the same for all subspaces. We prove this result using the methods introduced in a paper by Chatterjee and Ledoux on eigenvalues of principle submatrices. We show that by choosing an appropriate Markov chain, the methods of Chatterjee and Ledoux can be applied to give a more general result on operator compressions. As an additional application of this method, we prove concentration of measure of the length of the longest increasing subsequence of a random walk distributed under the invariant measure for the asymmetric exclusion process.

  12. Operated device estimation framework 

    E-Print Network [OSTI]

    Rengarajan, Janarthanan

    2009-05-15

    time on recloser slow curve Tl Point on the maximum equivalent lockout curve of recloser TRj Maximum clearing time at the chosen current for the jth operation TC Total Clearing TCC Time Current Characteristic V Volts / Voltage viii TABLE... to trip open. Sectionalizer setting should be one less than lockout setting of upstream protective device. The third factor is that sectionalizer?s memory time must be no longer than the cumulative tripping and reclosing time intervals of the upstream...

  13. Operating Experience Committee Charter

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematics AndBeryllium Disease | DepartmentOLED Stakeholder 137 Old InformationCHARTER FOR THE OPERATING

  14. ILC Operating Scenarios

    E-Print Network [OSTI]

    T. Barklow; J. Brau; K. Fujii; J. Gao; J. List; N. Walker; K. Yokoya

    2015-06-25

    The ILC Technical Design Report documents the design for the construction of a linear collider which can be operated at energies up to 500 GeV. This report summarizes the outcome of a study of possible running scenarios, including a realistic estimate of the real time accumulation of integrated luminosity based on ramp-up and upgrade processes. The evolution of the physics outcomes is emphasized, including running initially at 500 GeV, then at 350 GeV and 250 GeV. The running scenarios have been chosen to optimize the Higgs precision measurements and top physics while searching for evidence for signals beyond the standard model, including dark matter. In addition to the certain precision physics on the Higgs and top that is the main focus of this study, there are scientific motivations that indicate the possibility for discoveries of new particles in the upcoming operations of the LHC or the early operation of the ILC. Follow-up studies of such discoveries could alter the plan for the centre-of-mass collision energy of the ILC and expand the scientific impact of the ILC physics program. It is envisioned that a decision on a possible energy upgrade would be taken near the end of the twenty year period considered in this report.

  15. Operational health physics training

    SciTech Connect (OSTI)

    1992-06-01

    The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of {alpha}, {beta}, {gamma}, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included.

  16. Decision-Support Software for Grid Operators: Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation

    SciTech Connect (OSTI)

    2012-03-16

    GENI Project: The CRA team is developing control technology to help grid operators more actively manage power flows and integrate renewables by optimally turning on and off entire power lines in coordination with traditional control of generation and load resources. The control technology being developed would provide grid operators with tools to help manage transmission congestion by identifying the facilities whose on/off status must change to lower generation costs, increase utilization of renewable resources and improve system reliability. The technology is based on fast optimization algorithms for the near to real-time change in the on/off status of transmission facilities and their software implementation.

  17. Application of Location/Allocation Models and GIS to the Location of National Primary Schools in Rawang, Malaysia 

    E-Print Network [OSTI]

    Naharudin, Nabilah

    2014-11-30

    As education is compulsory in Malaysia, all children aged 7 to 12 are expected to attend primary schools. It is therefore a challenge for the government to provide schools which are well located to serve the children ...

  18. 1 Operating Systems overview & concepts

    E-Print Network [OSTI]

    Verschelde, Jan

    Outline 1 Operating Systems overview & concepts files and processes in UNIX the platform and os to Computer Science (MCS 260) Operating Systems & Turtle L-5 23 January 2015 1 / 36 #12;Operating Systems Turtle Graphics 1 Operating Systems overview & concepts files and processes in UNIX the platform and os

  19. Estimating the likelihood of weather criteria exceedance during marine operations

    SciTech Connect (OSTI)

    Brabazon, P.G. [Four Elements Ltd., London (United Kingdom); Gudmestad, O.T. [Statoil, Stavanger (Norway); Hopkins, J.S.

    1996-12-31

    This paper describes an approach to estimating the probability of marine operations being exposed to unsafe weather conditions. Marine operations, both inshore and offshore, are normally sensitive to environmental conditions. For the majority of operations threshold weather criteria will be predefined. An estimate of the likelihood of the operation experiencing bad weather, taking into account the uncertainties in weather forecasting, is of great value. The method is intended to be used as part of a risk assessment of marine operations, enabling the impact of design and scheduling decisions to be assessed in a structured and systematic way. The method has two components. Firstly, the time to complete an operation is defined in the form of a probability/time distribution. This is done by analyzing the duration of the tasks within the operation and identifying possible causes of delays. The likelihood and duration of each delay is estimated. Secondly, a probability/time curve is defined for the weather conditions exceeding the predefined threshold. The curve is determined by reference to the location of the marine operation, the time of year of the operation, the initial weather conditions and the accuracy of weather forecasting. Using the two probability/time curves, the likelihood of exposure is calculated.

  20. This article was downloaded by: [18.111.21.192] On: 06 April 2015, At: 08:00 Publisher: Institute for Operations Research and the Management Sciences (INFORMS)

    E-Print Network [OSTI]

    Bertsimas, Dimitris

    for Operations Research and the Management Sciences (INFORMS) INFORMS is located in Maryland, USA Operations. Operations Research Published online in Articles in Advance 01 Apr 2015 . http://dx.doi.org/10.1287/opre.2015 of operations research, management science, and analytics. For more information on INFORMS, its publications

  1. Between the poles : locating physics majors in the expert-novice continuum

    E-Print Network [OSTI]

    Gire, Elizabeth Ellen

    2007-01-01

    DISSERTATION Between the Poles: Locating Physics Majors inSAN DIEGO Between the Poles: Locating Physics Majors in the

  2. Supervisory Physical Scientist (Power Operations)

    Broader source: Energy.gov [DOE]

    This position is located in Duty Scheduling (PGSD), Generation Scheduling (PGS), Power Services (P), Bonneville Power Administration. Duty Scheduling provides 24-hour coverage of the real-time...

  3. Efficient Algorithm for Locating and Sizing Series Compensation...

    Office of Scientific and Technical Information (OSTI)

    Compensation Devices in Large Transmission Grids: Model Implementation We explore optimization methods for planning the placement, sizing and operations of Flexible Alternating...

  4. Impurity-doped optical shock, detonation and damage location sensor

    DOE Patents [OSTI]

    Weiss, J.D.

    1995-02-07

    A shock, detonation, and damage location sensor providing continuous fiber-optic means of measuring shock speed and damage location, and could be designed through proper cabling to have virtually any desired crush pressure. The sensor has one or a plurality of parallel multimode optical fibers, or a singlemode fiber core, surrounded by an elongated cladding, doped along their entire length with impurities to fluoresce in response to light at a different wavelength entering one end of the fiber(s). The length of a fiber would be continuously shorted as it is progressively destroyed by a shock wave traveling parallel to its axis. The resulting backscattered and shifted light would eventually enter a detector and be converted into a proportional electrical signals which would be evaluated to determine shock velocity and damage location. The corresponding reduction in output, because of the shortening of the optical fibers, is used as it is received to determine the velocity and position of the shock front as a function of time. As a damage location sensor the sensor fiber cracks along with the structure to which it is mounted. The size of the resulting drop in detector output is indicative of the location of the crack. 8 figs.

  5. Impurity-doped optical shock, detonation and damage location sensor

    DOE Patents [OSTI]

    Weiss, Jonathan D. (Albuquerque, NM)

    1995-01-01

    A shock, detonation, and damage location sensor providing continuous fiber-optic means of measuring shock speed and damage location, and could be designed through proper cabling to have virtually any desired crush pressure. The sensor has one or a plurality of parallel multimode optical fibers, or a singlemode fiber core, surrounded by an elongated cladding, doped along their entire length with impurities to fluoresce in response to light at a different wavelength entering one end of the fiber(s). The length of a fiber would be continuously shorted as it is progressively destroyed by a shock wave traveling parallel to its axis. The resulting backscattered and shifted light would eventually enter a detector and be converted into a proportional electrical signals which would be evaluated to determine shock velocity and damage location. The corresponding reduction in output, because of the shortening of the optical fibers, is used as it is received to determine the velocity and position of the shock front as a function of time. As a damage location sensor the sensor fiber cracks along with the structure to which it is mounted. The size of the resulting drop in detector output is indicative of the location of the crack.

  6. Equipment Operational Requirements

    SciTech Connect (OSTI)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  7. ARM - SGP Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Comments?govInstrumentsnoaacrnBarrow, Alaska OutreachCalendarPressExtended Facility SGP Related LinksOperations

  8. Operations | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating

  9. ARM - AMF Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.TheoryTuesday, August 10, 20102016 NewsUsers' Executive09 IArchitectureWestOperations

  10. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior8 , OperationsNovember 15

  11. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior8 , OperationsNovember 15E

  12. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior8 , OperationsNovember

  13. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior8 , OperationsNovemberto)

  14. LCLS Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousand CubicResource and JobLCLS Operating Schedule August - December

  15. Operations Program Management Jobs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEY UNIVERSEHowScientificOmbudsTestimony SenateOperations

  16. Business Operations Organization Chart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergy Webinar:I DueBETOof Energy Office of Business Operations

  17. Status of the JEFF Nuclear Data Library

    SciTech Connect (OSTI)

    Koning, A.J. [Nuclear Research and Consultancy Group NRG, P.O. Box 25, NL-1755 ZG Petten (Netherlands); Bersillon, O. [Commissariat a l'Energie Atomique, DAM/DIF/DPTA, Boite Postale 12, 91680 Bruyeres-le-Chatel (France); Forrest, R. A. [UKAEA/EURATOM Fusion Association, Culham Science Centre Abingdon, Oxfordshire, OX14 3DB (United Kingdom); Jacqmin, R.; Kellett, M.A. [CEA Cadarache, DEN/DER/SPRC, 13108 Saint Paul Lez Durance (France); Nouri, A. [IRSN, 77-83 avenue du General de Gaulle, 92140 Clamart (France); Rullhusen, P. [EC - JRC - IRMM, Retieseweg, B 2440 Geel (Belgium)

    2005-05-24

    The status of the Joint Evaluated Fission and Fusion file (JEFF) is described. The next version of the library, JEFF-3.1, comprises a significant update of actinide evaluations, evaluations emerging from European nuclear data projects, the activation library JEFF-3/A, the decay data and fission yield library, and fusion-related data files from the EFF project. The revisions were motivated by the availability of new measurements, modelling capabilities, or trends from integral experiments. Various pre-release validation efforts are underway, mainly for criticality and shielding of thermal and fast systems. This JEFF-3.1 library is expected to provide improved performances with respect to previous releases for a variety of scientific and industrial applications.

  18. The CAST experiment: status and perspectives

    E-Print Network [OSTI]

    Esther Ferrer Ribas; for the CAST Collaboration

    2009-12-21

    The status of the solar axion search with the CERN Axion Solar Telescope (CAST) will be discussed. Results from the first part of CAST phase II where the magnet bores were filled with \\hefour gas at variable pressure in order to scan \\ma up to 0.4 eV will be presented. From the absence of excess X-rays when the magnet was pointing to the Sun, we set a typical upper limit on the axion-photon coupling of $\\gag \\lesssim 2.17 \\times10^{-10}$GeV$^{-1}$ at 95% CL for \\ma$CAST phase II. Expectations for sensibilities will be given. Near future perspectives as well as more long term options for a new helioscope experiment will be evoked.

  19. Status of the Magma Energy Project

    SciTech Connect (OSTI)

    Dunn, J.C.

    1987-01-01

    The current magma energy project is assessing the engineering feasibility of extracting thermal energy directly from crustal magma bodies. The estimated size of the US resource (50,000 to 500,000 quads) suggests a considerable potential impact on future power generation. In a previous seven-year study, we concluded that there are no insurmountable barriers that would invalidate the magma energy concept. Several concepts for drilling, energy extraction, and materials survivability were successfully demonstrated in Kilauea Iki lava lake, Hawaii. The present program is addressing the engineering design problems associated with accessing magma bodies and extracting thermal energy for power generation. The normal stages for development of a geothermal resource are being investigated: exploration, drilling and completions, production, and surface power plant design. Current status of the engineering program and future plans are described. 20 refs., 12 figs.

  20. HARDWARE AND SOFTWARE STATUS OF QCDOC.

    SciTech Connect (OSTI)

    BOYLE,P.A.; CHEN,D.; CHRIST,N.H.; PETROV.K.; ET AL.

    2003-07-15

    QCDOC is a massively parallel supercomputer whose processing nodes are based on an application-specific integrated circuit (ASIC). This ASIC was custom-designed so that crucial lattice QCD kernels achieve an overall sustained performance of 50% on machines with several 10,000 nodes. This strong scalability, together with low power consumption and a price/performance ratio of $1 per sustained MFlops, enable QCDOC to attack the most demanding lattice QCD problems. The first ASICs became available in June of 2003, and the testing performed so far has shown all systems functioning according to specification. We review the hardware and software status of QCDOC and present performance figures obtained in real hardware as well as in simulation.