National Library of Energy BETA

Sample records for loading relief procedure

  1. Load research manual. Volume 2. Fundamentals of implementing load research procedures

    SciTech Connect (OSTI)

    Brandenburg, L.; Clarkson, G.; Grund, Jr., C.; Leo, J.; Asbury, J.; Brandon-Brown, F.; Derderian, H.; Mueller, R.; Swaroop, R.

    1980-11-01

    This three-volume manual presents technical guidelines for electric utility load research. Special attention is given to issues raised by the load data reporting requirements of the Public Utility Regulatory Policies Act of 1978 and to problems faced by smaller utilities that are initiating load research programs. In Volumes 1 and 2, procedures are suggested for determining data requirements for load research, establishing the size and customer composition of a load survey sample, selecting and using equipment to record customer electricity usage, processing data tapes from the recording equipment, and analyzing the data. Statistical techniques used in customer sampling are discussed in detail. The costs of load research also are estimated, and ongoing load research programs at three utilities are described. The manual includes guides to load research literature and glossaries of load research and statistical terms.

  2. RELAP5/MOD3 assessment for calculation of safety and relief valve discharge piping hydrodynamic loads. International agreement report

    SciTech Connect (OSTI)

    Stubbe, E.J.; VanHoenacker, L.; Otero, R.

    1994-02-01

    This report presents an assessment study for the use of the code RELAP 5/MOD3/5M5 in the calculation of transient hydrodynamic loads on safety and relief discharge pipes. Its predecessor, RELAP 5/MOD1, was found adequate for this kind of calculations by EPRI. The hydrodynamic loads are very important for the discharge piping design because of the fast opening of the valves and the presence of liquid in the upstream loop seals. The code results are compared to experimental load measurements performed at the Combustion Engineering Laboratory in Windsor (US). Those measurements were part of the PWR Valve Test Program undertaken by EPRI after the TMI-2 accident. This particular kind of transients challenges the applicability of the following code models: two-phase choked discharge; interphase drag in conditions with large density gradients; heat transfer to metallic structures in fast changing conditions; two-phase flow at abrupt expansions. The code applicability to this kind of transients is investigated. Some sensitivity analyses to different code and model options are performed. Finally, the suitability of the code and some modeling guidelines are discussed.

  3. WPN 01-7: Energy Crisis Relief

    Broader source: Energy.gov [DOE]

    To provide guidance to regional offices and states relative to procedures in handling major energy crisis relief affecting Weatherization Program activities.

  4. The operation of LPG relief valves

    SciTech Connect (OSTI)

    Stannard, J.H. Jr

    1989-11-01

    As stipulated by NFPA 58, all LPG storage containers must be equipped with one or more pressure relief devices. These devices are sized to prevent rupture of a normally charged container when exposed to fire. This paper describes in detail the functioning of the spring-loaded relief valve. The author discusses how the venting of LPGs can produce unacceptable risks and how training is a necessary part of controlling such a situation.

  5. Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedures A NSSAB outreach display is available for community events The Nevada Site Specific Advisory Board (NSSAB) abides by a variety of federal and self-imposed procedures....

  6. Hydrogen gas relief valve

    DOE Patents [OSTI]

    Whittlesey, Curtis C.

    1985-01-01

    An improved battery stack design for an electrochemical system having at least one cell from which a gas is generated and an electrolyte in communication with the cell is described. The improved battery stack design features means for defining a substantially closed compartment for containing the battery cells and at least a portion of the electrolyte for the system, and means in association with the compartment means for selectively venting gas from the interior of the compartment means in response to the level of the electrolyte within the compartment means. The venting means includes a relief valve having a float member which is actuated in response to the level of the electrolyte within the compartment means. This float member is adapted to close the relief valve when the level of the electrolyte is above a predetermined level and open the relief valve when the level of electrolyte is below this predetermined level.

  7. Fluid relief and check valve

    DOE Patents [OSTI]

    Blaedel, K.L.; Lord, S.C.; Murray, I.

    1986-07-17

    A passive fluid pressure relief and check valve allows the relief pressure to be slaved to a reference pressure independently of the exhaust pressure. The pressure relief valve is embodied by a submerged vent line in a sealing fluid, the relief pressure being a function of the submerged depth. A check valve is embodied by a vertical column of fluid (the maximum back pressure being a function of the height of the column of fluid). The pressure is vented into an exhaust system which keeps the exhaust out of the area providing the reference pressure.

  8. New program sizes pressure-relief drums

    SciTech Connect (OSTI)

    Durand, A.A.; Osorio, R.A.; Suarez, R.H.

    1996-05-06

    In accordance with API Recommended Practice 521, a new procedure has been developed for the design of relief drums. The calculation method determines by convergence the most economical length-to-diameter ratio for gas-liquid separation vessels. Drum sizing is based on the separation of a two-phase stream, taking into account the special condition of intermittent flow. Design parameters such as settling velocity and residence time also must be calculated to determine an optimum design. A new program based on a programmable algorithm can be converted from basic language to any other computer language to facilitate vessel-design computations. The program quickly and efficiently computes design values for relief systems used in refineries and petrochemical plants.

  9. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 4. Evaluation of other loads and load combinations

    SciTech Connect (OSTI)

    Not Available

    1984-12-01

    Six topical areas were covered by the Task Group on Other Dynamic Loads and Load Combinations as described below: Event Combinations - dealing with the potential simultaneous occurrence of earthquakes, pipe ruptures, and water hammer events in the piping design basis; Response Combinations - dealing with multiply supported piping with independent inputs, the sequence of combinations between spacial and modal components of response, and the treatment of high frequency modes in combination with low frequency modal responses; Stress Limits/Dynamic Allowables - dealing with inelastic allowables for piping and strain rate effects; Water Hammer Loadings - dealing with code and design specifications for these loadings and procedures for identifying potential water hammer that could affect safety; Relief Valve Opening and Closing Loads - dealing with the adequacy of analytical tools for predicting the effects of these events and, in addition, with estimating effective cycles for fatigue evaluations; and Piping Vibration Loads - dealing with evaluation procedures for estimating other than seismic vibratory loads, the need to consider reciprocating and rotary equipment vibratory loads, and high frequency vibratory loads. NRC staff recommendations or regulatory changes and additional study appear in this report.

  10. Demonstrate Scale-up Procedure for Glass Composite Material (GCM) for Incorporation of Iodine Loaded AgZ.

    SciTech Connect (OSTI)

    Nenoff, Tina M.; Garino, Terry J.; Croes, Kenneth James; Rodriguez, Mark A.

    2015-07-01

    Two large size Glass Composite Material (GCM) waste forms containing AgI-MOR were fabricated. One contained methyl iodide-loaded AgI-MOR that was received from Idaho National Laboratory (INL, Test 5, Beds 1 3) and the other contained iodine vapor loaded AgIMOR that was received from Oak Ridge National Laboratory (ORNL, SHB 2/9/15 ). The composition for each GCM was 20 wt% AgI-MOR and 80 wt% Ferro EG2922 low sintering temperature glass along with enough added silver flake to prevent any I2 loss during the firing process. The silver flake amounts were 1.2 wt% for the GCM with the INL AgI-MOR and 3 wt% for the GCM contained the ORNL AgI-MOR. The GCMs, nominally 100 g, were first uniaxially pressed to 6.35 cm (2.5 inch) diameter disks then cold isostatically pressed, before firing in air to 550C for 1hr. They were cooled slowly (1C/min) from the firing temperature to avoid any cracking due to temperature gradients. The final GCMs were ~5 cm in diameter (~2 inches) and non-porous with densities of ~4.2 g/cm. X-ray diffraction indicated that they consisted of the amorphous glass phase with small amounts of mordenite and AgI. Furthermore, the presence of the AgI was confirmed by X-ray fluorescence. Methodology for the scaled up production of GCMs to 6 inch diameter or larger is also presented.

  11. SU-E-T-615: Investigation of the Dosimetric Impact of Tandem Loading in the Treatment of Cervical Cancer for HDR Brachytherapy Procedures

    SciTech Connect (OSTI)

    Esquivel, C; Patton, L; Nelson, K; Lin, B

    2014-06-01

    Purpose: To quantify the dosimetric impact of the tandem loading in the treatment of cervical cancer for HDR brachytherapy procedures. Methods: Ten patients were evaluated, each of whom received 5 fractions of treatment. Tandem and ovoid sets were inserted into the uterine cavity based on institutional protocols and procedures. Following insertion and stabilization, CT image sets of 1.5mm slice thickness were acquired and sent to the Oncentra V4.3 Treatment Planning System. Critical structures such as the CTV, bladder, rectum, sigmoid, and bowel were contoured and a fractional dose of 5.5Gy was prescribed to Point A for each patient. Six different treatment plans were created for each fraction using varying tandem weightings; from 0.5 to 1.4 times that of the ovoids. Surface dose evaluation of various ovoid diameters, 2.0-3.5cm, at the vaginal fornices was also investigated. Results: Critical structures were evaluated based on varying dose and volume constraints, in particular the 2.0 cc volume recommendation cited by the gynecological GEC-ESTRO working group. Based on dose volume histogram evaluation, a reduction of dose to the critical structures was most often discovered when the tandem weighting was increased. CTV coverage showed little change as the tandem weighting was varied. Ovoid surface dose decreased by 50-65% as the tandem weighting increased. Conclusion: The advantage of 3D planning with HDR brachytherapy is the dose optimization for each individual treatment plan. This investigation shows that by utilizing large tandem weightings, 1.4 times greater than the ovoid, one can still achieve adequate coverage of the CTV and relatively low doses to the critical structures. In some cases, one would still have to optimize further per individual case. In addition, the ovoid surface dose was greatly decreased when large tandem weighting was utilized; especially for small ovoid diameters.

  12. Small Business Liability Relief and Brownfields Revitalization...

    Open Energy Info (EERE)

    Business Liability Relief and Brownfields Revitalization Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Small Business...

  13. OPEC reorganization could spell relief

    SciTech Connect (OSTI)

    Crouse, P.C.

    1987-02-01

    Last year proved to be one of carnage in the oil industry, with only the large, vertically integrated, international oil companies showing strength during the oil price collapse. Independent producers and the manufacturing/service sector watched 50% or greater reductions in income. And this year holds little prospect for significant relief during its first half, although the last half could be better if and when Opec decides to once again test its strength. An Iranian victory in the Iran/Iraq war could also cause an upward movement in price. However, price instability should be less than in 1986, as the business heads toward a consensus price via political factors. The U.S. economy again showed improvement through 1986, with moderate growth of 2.6% in Gross National Product (GNP). The ongoing expansion has lasted four years and is already 17 months longer than the average peacetime expansion. However, important energy components did not show strength, and industrial production continued at level rates for the past two years.

  14. Pressure Relief Devices for Compressed Hydrogen Vehicle Fuel...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pressure Relief Devices for Compressed Hydrogen Vehicle Fuel Containers Pressure Relief Devices for Compressed Hydrogen Vehicle Fuel Containers These slides were presented at the...

  15. Load research manual. Volume 3. Load research for advanced technologies

    SciTech Connect (OSTI)

    Brandenburg, L.; Clarkson, G.; Grund, Jr., C.; Leo, J.; Asbury, J.; Brandon-Brown, F.; Derderian, H.; Mueller, R.; Swaroop, R.

    1980-11-01

    This three-volume manual presents technical guidelines for electric utility load research. Special attention is given to issues raised by the load data reporting requirements of the Public Utility Regulatory Policies Act of 1978 and to problems faced by smaller utilities that are initiating load research programs. The manual includes guides to load research literature and glossaries of load research and statistical terms. In Volume 3, special load research procedures are presented for solar, wind, and cogeneration technologies.

  16. Efficiently evaluate complex pressure relief systems

    SciTech Connect (OSTI)

    Wright, R.K.; Walker, A.G.

    1997-01-01

    This article will present the steps necessary to perform a comprehensive analysis of complex pressure relief systems. The goal is not to discuss detailed calculations for proper valve sizing and selection, but rather to analyze and verify existing system configurations. Sizing and selection have been covered in detail by the American Petroleum Institute (API) RP 520, API RP 521, various AIChE Design Institute for Emergency Relief Systems (DIERS) publications, and other sources. In their work with industry, the authors have noticed a tendency for some engineers to proceed with detailed calculations without first preparing an overall strategy and implementation plan to make sure that the calculations yield the desired results. They have seen detailed pressure relief system analyses costing hundreds of thousands of dollars which, for any number of reasons, are incorrect. The old adage GIGO (garbage in/garbage out) certainly applies to pressure relief system analysis. They will address the thought processes and actions necessary to correctly and efficiently evaluate complex pressure relief systems.

  17. DEPARTMENT OF ENERGY OFFICE OF GENERAL COUNSEL INTERPRETATION REGARDING EXEMPTION RELIEF PURSUANT TO

    Office of Environmental Management (EM)

    INTERPRETATION REGARDING EXEMPTION RELIEF PURSUANT TO 10 C.F.R. PART 820, PROCEDURAL RULES FOR DOE NUCLEAR ACTIVITIES, SUBPART E, EXEMPTION RELIEF, AND NON-COMPLIANT "DOCUMENTED SAFETY ANALYSES" SUBJECT TO 10 C.F.R. PART 830, NUCLEAR SAFETY MANAGEMENT, SUBPART B, SAFETY BASIS REQUIREMENTS Subpart D to 10 C.F.R Part 820 provides that the Department of Energy's (DOE) General Counsel (GC) shall be responsible for interpreting the DOE Nuclear Safety Requirements. Pursuant to that

  18. Load cell

    DOE Patents [OSTI]

    Spletzer, B.L.

    1998-12-15

    A load cell combines the outputs of a plurality of strain gauges to measure components of an applied load. Combination of strain gauge outputs allows measurement of any of six load components without requiring complex machining or mechanical linkages to isolate load components. An example six axis load cell produces six independent analog outputs, each directly proportional to one of the six general load components. 16 figs.

  19. Plans, Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plans, Procedures Plans, Procedures The following plans and procedures are cited in environmental reports prepared by the Laboratory. Contact Environmental Communication & Public Involvement Email Environmental Plans & Procedures DISCLAIMER: The following is a list of procedures (titles and numbers) cited in reports that have been prepared by the Laboratory's Associate Directorate for Environmental Management (ADEM). To view each procedure, visit the Electronic Public Reading Room (EPRR)

  20. Title 43 CFR 3279 Utilization Relief and Appeals | Open Energy...

    Open Energy Info (EERE)

    9 Utilization Relief and Appeals Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 3279...

  1. Method for residual stress relief and retained austenite destabilization

    DOE Patents [OSTI]

    Ludtka, Gerard M.

    2004-08-10

    A method using of a magnetic field to affect residual stress relief or phase transformations in a metallic material is disclosed. In a first aspect of the method, residual stress relief of a material is achieved at ambient temperatures by placing the material in a magnetic field. In a second aspect of the method, retained austenite stabilization is reversed in a ferrous alloy by applying a magnetic field to the alloy at ambient temperatures.

  2. Pressure Relief Devices for Compressed Hydrogen Vehicle Fuel Containers |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Pressure Relief Devices for Compressed Hydrogen Vehicle Fuel Containers Pressure Relief Devices for Compressed Hydrogen Vehicle Fuel Containers These slides were presented at the Onboard Storage Tank Workshop on April 29, 2010. PDF icon pressurerelief_compressedcontainers_ostw.pdf More Documents & Publications Fueling Components Testing and Certification CSA International Certification Discussion Hydrogen Technology Workshop U.S. Department of Energy Onboard Storage

  3. STATISTICAL PERFORMANCE EVALUATION OF SPRING OPERATED PRESSURE RELIEF VALVE

    Office of Scientific and Technical Information (OSTI)

    RELIABILITY IMPROVEMENTS 2004 TO 2014 (Conference) | SciTech Connect STATISTICAL PERFORMANCE EVALUATION OF SPRING OPERATED PRESSURE RELIEF VALVE RELIABILITY IMPROVEMENTS 2004 TO 2014 Citation Details In-Document Search Title: STATISTICAL PERFORMANCE EVALUATION OF SPRING OPERATED PRESSURE RELIEF VALVE RELIABILITY IMPROVEMENTS 2004 TO 2014 Authors: Harris, S. ; Gross, R. ; Watson, H. Publication Date: 2015-02-04 OSTI Identifier: 1209039 Report Number(s): SRNL-STI-2015-00047

  4. Science Against Stress: Research Shows Way to Some Cellular Relief |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Science Against Stress: Research Shows Way to Some Cellular Relief Science Against Stress: Research Shows Way to Some Cellular Relief December 30, 2011 - 10:14am Addthis Researchers at Brookhaven National Lab (BNL) are studying how radiation affects DNA, specifically a tumor-suppressor protein called p53, which deploys cell repair efforts. | Photo courtesy of National Institute of Health. Researchers at Brookhaven National Lab (BNL) are studying how radiation affects

  5. Emergency Procedures

    Broader source: Energy.gov [DOE]

    Note: This page is pending deletion, please refer to the Safety and health main page for emergency procedure information:

  6. LOADED WAVEGUIDES

    DOE Patents [OSTI]

    Mullett, L.B.; Loach, B.G.; Adams, G.L.

    1958-06-24

    >Loaded waveguides are described for the propagation of electromagnetic waves with reduced phase velocities. A rectangular waveguide is dimensioned so as to cut-off the simple H/sub 01/ mode at the operating frequency. The waveguide is capacitance loaded, so as to reduce the phase velocity of the transmitted wave, by connecting an electrical conductor between directly opposite points in the major median plane on the narrower pair of waveguide walls. This conductor may take a corrugated shape or be an aperature member, the important factor being that the electrical length of the conductor is greater than one-half wavelength at the operating frequency. Prepared for the Second U.N. International ConferThe importance of nuclear standards is duscussed. A brief review of the international callaboration in this field is given. The proposal is made to let the International Organization for Standardization (ISO) coordinate the efforts from other groups. (W.D.M.)

  7. Conceptual design of pressure relief systems for cryogenic application

    SciTech Connect (OSTI)

    Grohmann, S.; Süßer, M.

    2014-01-29

    The conceptual design of pressure relief systems is an important aspect in the early phase of any cryogenic system design, because a prudent and responsible evaluation of relief systems involves much more than just relief devices. The conceptual design consists of various steps: At first, hazard scenarios must be considered and the worst-case scenario identified. Next, a staged interaction against pressure increase is to be defined. This is followed by the selection of the general type of pressure relief device for each stage, such as safety valve and rupture disc, respectively. Then, a decision concerning their locations, their capacities and specific features must be taken. Furthermore, it is mandatory to consider the inlet pressure drop and the back pressure in the exhaust line for sizing the safety devices. And last but not least, economic and environmental considerations must be made in case of releasing the medium to the atmosphere. The development of the system's safety concept calls for a risk management strategy based on identification and analysis of hazards, and consequent risk mitigation using a system-based approach in compliance with the standards.

  8. HLW Glass Waste Loadings

    Office of Environmental Management (EM)

    HLW Glass Waste Loadings Ian L. Pegg Vitreous State Laboratory The Catholic University of ... (JHCM) technology Factors affecting waste loadings Waste loading requirements ...

  9. Shot loading trainer analysis

    SciTech Connect (OSTI)

    Peterson, T.K.

    1995-02-15

    This document presents the results from the analysis of the shot loading trainer (SLT). This device will be used to test the procedure for installing shot into the annulus of the Project W-320 shipping container. To ensure that the shot is installed uniformly around the container, vibrators will be used to settle the shot. The SLT was analyzed to ensure that it would not jeopardize worker safety during operation. The results from the static analysis of the SLT under deadweight and vibrator operating loads show that the stresses in the SLT are below code allowables. The results from the modal analysis show that the natural frequencies of the SLT are far below the operating frequencies of the vibrators, provided the SLT is mounted on pneumatic tires. The SLT was also analyzed for wind, seismic, deadweight, and moving/transporting loads. Analysis of the SLT is in accordance with SDC-4.1 for safety class 3 structures (DOE-RL 1993) and the American Institute of Steel Construction (AISC) Manual of Steel Construction (AISC 1989).

  10. INTERPRETATION REGARDING EXEMPTION RELIEF UNDER 10 C.F.R. PART 820, SUBPART

    Energy Savers [EERE]

    E, EXEMPTION RELIEF, AND NON-COMPLIANT 'DOCUMENTED SAFETY ANALYSES' SUBJECT TO 10 C.F.R. PART 830, NUCLEAR SAFETY MANAGEMENT, SUBPART B, SAFETY BASIS REQUIREMENTS | Department of Energy EXEMPTION RELIEF UNDER 10 C.F.R. PART 820, SUBPART E, EXEMPTION RELIEF, AND NON-COMPLIANT 'DOCUMENTED SAFETY ANALYSES' SUBJECT TO 10 C.F.R. PART 830, NUCLEAR SAFETY MANAGEMENT, SUBPART B, SAFETY BASIS REQUIREMENTS INTERPRETATION REGARDING EXEMPTION RELIEF UNDER 10 C.F.R. PART 820, SUBPART E, EXEMPTION RELIEF,

  11. High voltage bushing having weathershed and surrounding stress relief collar

    DOE Patents [OSTI]

    Cookson, Alan H. (Pittsburgh, PA)

    1981-01-01

    A high voltage electric bushing comprises a hollow elongated dielectric weathershed which encloses a high voltage conductor. A collar formed of high voltage dielectric material is positioned over the weathershed and is bonded thereto by an interface material which precludes moisture-like contaminants from entering between the bonded portions. The collar is substantially thicker than the adjacent weathershed which it surrounds, providing relief of the electric stresses which would otherwise appear on the outer surface of the weathershed. The collar may include a conductive ring or capacitive foil to further relieve electric stresses experienced by the bushing.

  12. PRESSURE RELIEF DEVICE DATA SHEET FORM PS-5 Pressure System Number: Date:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RELIEF DEVICE DATA SHEET FORM PS-5 Pressure System Number: Date: Pressure System Name: Pressure Vessel Number (if Applicable): Device installed directly on vessel?: __Yes __No Code: System Fluid: Code Year: Fluid State: Fluid Category: RELIEF DEVICE DATA Device Type ___Safety Relief Valve ____Rupture Disk ___Other (specify) Certification Type: ___ASME ___CE/PED ___Other (specify) Manufacturer Rated Flow Capacity: Part Number Converted Flow Capacity: Serial Number Set Pressure Inspection/Test

  13. PRESSURE RELIEF DEVICE TESTING AND INSPECTION DATA SHEET FORM PS-12

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RELIEF DEVICE TESTING AND INSPECTION DATA SHEET FORM PS-12 Pressure System Number: Date: Pressure System Name: Vessel Number (if Applicable): Device installed directly on vessel?: __Yes __No Code: System Fluid: Code Year: Fluid State: Fluid Category: RELIEF DEVICE DATA Device Type ___Safety Relief Valve ____Rupture Disk ___Other (specify) Certification Type: ___ASME ___CE/PED ___Other (specify) Manufacturer Rated Flow Capacity: Part Number Converted Flow Capacity: Serial Number Set Pressure: Set

  14. INTERPRETATION REGARDING EXEMPTION RELIEF UNDER 10 C.F.R. PART...

    Energy Savers [EERE]

    RELIEF, AND NON-COMPLIANT 'DOCUMENTED SAFETY ANALYSES' SUBJECT TO 10 C.F.R. PART 830, NUCLEAR SAFETY MANAGEMENT, SUBPART B, SAFETY BASIS REQUIREMENTS INTERPRETATION REGARDING...

  15. Minimum Day Time Load Calculation and Screening

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Minimum Daytime Load Calculation and Screening Page 1 of 30 Kristen Ardani, Dora Nakfuji, Anthony Hong, and Babak Enayati Page 1 of 30 [Speaker: Kristen Ardani] Cover Slide: Thank you everyone for joining us today for our DG interconnection collaborative informational webinar. Today we are going to talk about minimum day time load calculation and screening procedures and their role in the distributed PV interconnection process. We're going to hear from Babak Enayati of the Massachusetts

  16. Procedures - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedures You must be logged in with your Berkeley Lab LDAP to view these documents PUB-3000 Cyclotron Procedures Mechanical Procedures Electrical Procedures Ion Source Procedures Safety Assessment Document Radiological Work Authorizations Memorandums Forms Abbreviations & Acronyms

  17. Load sensing system

    DOE Patents [OSTI]

    Sohns, Carl W. (Oak Ridge, TN); Nodine, Robert N. (Knoxville, TN); Wallace, Steven Allen (Knoxville, TN)

    1999-01-01

    A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast

  18. Reviews of ASME Section 11 pump and valve relief requests: Post Generic Letter 89-04

    SciTech Connect (OSTI)

    DiBiasio, A.

    1992-07-01

    This paper presents a discussion of ASME Section 11 Pump and Valve Inservice Testing relief request reviews by the NRC and their contractors. Topics that will be discussed include the scope of USNRC reviews in Technical Evaluation Reports (TERs) (and Safety Evaluation, SEs); including the basis for granting relief requests, the status of relief requests in IST Program updates, and the Generic Letter 89-04 approval process; and the level of technical detail required in submitted programs. This presentation is based on the experiences of Brookhaven National Laboratory in reviewing IST Programs for the Mechanical Engineering Branch of the US Nuclear Regulatory Commission.

  19. Reviews of ASME Section 11 pump and valve relief requests: Post Generic Letter 89-04

    SciTech Connect (OSTI)

    DiBiasio, A.

    1992-01-01

    This paper presents a discussion of ASME Section 11 Pump and Valve Inservice Testing relief request reviews by the NRC and their contractors. Topics that will be discussed include the scope of USNRC reviews in Technical Evaluation Reports (TERs) (and Safety Evaluation, SEs); including the basis for granting relief requests, the status of relief requests in IST Program updates, and the Generic Letter 89-04 approval process; and the level of technical detail required in submitted programs. This presentation is based on the experiences of Brookhaven National Laboratory in reviewing IST Programs for the Mechanical Engineering Branch of the US Nuclear Regulatory Commission.

  20. Origins of relief along contacts between eolian sandstones and overlying marine strata

    SciTech Connect (OSTI)

    Eschner, T.B.; Kocurek, G.

    1988-08-01

    Origins of large-scale relief along eolian-marine unit contacts, which form significant stratigraphic traps for hydrocarbons, can be recognized as inherited, reworked, and/or erosional. The Permian Rotliegende-Weissliegende Sandstone and Yellow Sands of Europe may best exemplify inherited relief in that dunes are preserved largely intact. Reworked relief, which shows significant destruction of original dune topography but with remnants of the bedforms preserved, is shown by relict Holocene dunes of coastal Australia, the Jurassic Entrada Sandstone of the San Juan basin, and the Pennsylvanian-Permian Minnelusa Formation of Wyoming. Erosional relief results from post-eolian processes and is exemplified by the Jurassic Entrada Sandstone of northeastern Utah. 11 figs., 1 tab.

  1. Working Families Tax Relief Act of 2004 (released in AEO2005)

    Reports and Publications (EIA)

    2005-01-01

    The Working Families Tax Relief Act of 2004 was signed into law on October 13, 2004. Primarily, the Act reduces taxes for individuals and businesses. At least two provisions relate to energy: Depletion of marginal properties and qualified vehicles.

  2. Load sensing system

    DOE Patents [OSTI]

    Sohns, C.W.; Nodine, R.N.; Wallace, S.A.

    1999-05-04

    A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast inventories of stored nuclear material can be continuously monitored and inventoried of minimal cost. 4 figs.

  3. Load regulating expansion fixture

    DOE Patents [OSTI]

    Wagner, Lawrence M. (San Jose, CA); Strum, Michael J. (San Jose, CA)

    1998-01-01

    A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components.

  4. Load regulating expansion fixture

    DOE Patents [OSTI]

    Wagner, L.M.; Strum, M.J.

    1998-12-15

    A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils is disclosed. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components. 1 fig.

  5. DOE Offers Relief to Importers Affected by West Coast Port Closures |

    Energy Savers [EERE]

    Department of Energy Offers Relief to Importers Affected by West Coast Port Closures DOE Offers Relief to Importers Affected by West Coast Port Closures February 27, 2015 - 5:28pm Addthis Closures at 29 West Coast marine ports in February 2015 due to a labor dispute have resulted in significant delays for certain goods entering the United States through those ports. DOE issued an enforcement policy not to seek civil penalties for violations of the energy and water conservation standards

  6. Cable load sensing device

    DOE Patents [OSTI]

    Beus, Michael J. (Spokane, WA); McCoy, William G. (Spokane, WA)

    1998-01-01

    Apparatus for sensing the magnitude of a load on a cable as the cable is employed to support the load includes a beam structure clamped to the cable so that a length of the cable lies along the beam structure. A spacer associated with the beam structure forces a slight curvature in a portion of the length of cable under a cable "no-load" condition so that the portion of the length of cable is spaced from the beam structure to define a cable curved portion. A strain gauge circuit including strain gauges is secured to the beam structure by welding. As the cable is employed to support a load the load causes the cable curved portion to exert a force normal to the cable through the spacer and on the beam structure to deform the beam structure as the cable curved portion attempts to straighten under the load. As this deformation takes place, the resistance of the strain gauges is set to a value proportional to the magnitude of the normal strain on the beam structure during such deformation. The magnitude of the normal strain is manipulated in a control device to generate a value equal to the magnitude or weight of the load supported by the cable.

  7. A loaded thermoacoustic engine

    SciTech Connect (OSTI)

    Olson, J.R.; Swift, G.W.

    1995-11-01

    Measurements and analysis of the performance of a thermoacoustic engine driving a dissipative load are presented. The effect of the load can be explained qualitatively using a simple low-amplitude approximation and quantitatively by invoking a more accurate low-amplitude numerical solution. The heater power {ital @};DQ and hot-end temperature {ital T}{sub {ital H}} are found to be simple functions of the load impedance and the unloaded values of {ital @};DQ and {ital T}{sub {ital H}}. {copyright} {ital 1995} {ital Acoustical} {ital Society} {ital of} {ital America}.

  8. Policies and Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policies and Procedures Guidelines Safety Computer Security Conduct of Operations JLF Forms Publication Policy

  9. LOADING MACHINE FOR REACTORS

    DOE Patents [OSTI]

    Simon, S.L.

    1959-07-01

    An apparatus is described for loading or charging slugs of fissionable material into a nuclear reactor. The apparatus of the invention is a "muzzle loading" type comprising a delivery tube or muzzle designed to be brought into alignment with any one of a plurality of fuel channels. The delivery tube is located within the pressure shell and it is also disposed within shielding barriers while the fuel cantridges or slugs are forced through the delivery tube by an externally driven flexible ram.

  10. Load Monitoring CEC/LMTF Load Research Program

    SciTech Connect (OSTI)

    Huang, Zhenyu; Lesieutre, B.; Yang, Steve; Ellis, A.; Meklin, A.; Wong, B.; Gaikwad, A.; Brooks, D.; Hammerstrom, Donald J.; Phillips, John; Kosterev, Dmitry; Hoffman, M.; Ciniglio, O.; Hartwell, R.; Pourbeik, P.; Maitra, A.; Lu, Ning

    2007-11-30

    This white paper addresses the needs, options, current practices of load monitoring. Recommendations on load monitoring applications and future directions are also presented.

  11. Computerized procedures system

    DOE Patents [OSTI]

    Lipner, Melvin H. (Monroeville, PA); Mundy, Roger A. (North Huntingdon, PA); Franusich, Michael D. (Upper St. Clair, PA)

    2010-10-12

    An online data driven computerized procedures system that guides an operator through a complex process facility's operating procedures. The system monitors plant data, processes the data and then, based upon this processing, presents the status of the current procedure step and/or substep to the operator. The system supports multiple users and a single procedure definition supports several interface formats that can be tailored to the individual user. Layered security controls access privileges and revisions are version controlled. The procedures run on a server that is platform independent of the user workstations that the server interfaces with and the user interface supports diverse procedural views.

  12. Federal Agency NEPA Procedures

    Broader source: Energy.gov [DOE]

    Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

  13. AVTA: Full-Size Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Full-Size Electric Vehicle Specifications and Test Procedures AVTA: Full-Size Electric Vehicle Specifications and Test Procedures PDF icon EV America Test Specifications PDF icon ETA-TP001 Implementation of SAE Standard J1263, February 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques PDF icon ETA-TP002 Implementation of SAE Standard J1666, May 1993 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure PDF icon

  14. AVTA: Hybrid Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Hybrid Electric Vehicle Specifications and Test Procedures PDF icon Fleet Test and Evaluation Procedure PDF icon HEVAmerica Technical Specifications PDF icon HEV Baseline Test Sequence PDF icon HEV End of Life Test Sequence PDF icon ETA-HTP01 Implementation of SAE Standard J1263 February 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques PDF icon ETA-HTP02 Implementation of

  15. AVTA: Urban Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Urban Electric Vehicle Specifications and Test Procedures AVTA: Urban Electric Vehicle Specifications and Test Procedures PDF icon UEVAmerica Specifications PDF icon ETA-UTP001 Implementation of SAE Standard J1263, Feb. 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques PDF icon ETA-UTP002 Implementation of SAE Standard J1666, May 1993 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure PDF icon ETA-UTP003

  16. LOADING AND UNLOADING DEVICE

    DOE Patents [OSTI]

    Treshow, M.

    1960-08-16

    A device for loading and unloading fuel rods into and from a reactor tank through an access hole includes parallel links carrying a gripper. These links enable the gripper to go through the access hole and then to be moved laterally from the axis of the access hole to the various locations of the fuel rods in the reactor tank.

  17. Multidimensional spectral load balancing

    DOE Patents [OSTI]

    Hendrickson, Bruce A. (Albuquerque, NM); Leland, Robert W. (Albuquerque, NM)

    1996-12-24

    A method of and apparatus for graph partitioning involving the use of a plurality of eigenvectors of the Laplacian matrix of the graph of the problem for which load balancing is desired. The invention is particularly useful for optimizing parallel computer processing of a problem and for minimizing total pathway lengths of integrated circuits in the design stage.

  18. Measuring alignment of loading fixture

    DOE Patents [OSTI]

    Scavone, Donald W. (Saratoga Springs, NY)

    1989-01-01

    An apparatus and method for measuring the alignment of a clevis and pin type loading fixture for compact tension specimens include a pair of substantially identical flat loading ligaments. Each loading ligament has two apertures for the reception of a respective pin of the loading fixture and a thickness less than one-half of a width of the clevis opening. The pair of loading ligaments are mounted in the clevis openings at respective sides thereof. The loading ligaments are then loaded by the pins of the loading fixture and the strain in each loading ligament is measured. By comparing the relative strain of each loading ligament, the alignment of the loading fixture is determined. Preferably, a suitable strain gage device is located at each longitudinal edge of a respective loading ligament equidistant from the two apertures in order to determine the strain thereat and hence the strain of each ligament. The loading ligaments are made substantially identical by jig grinding the loading ligaments as a matched set. Each loading ligament can also be individually calibrated prior to the measurement.

  19. Load rejection operation in conventional power plants in ENEL - Italy

    SciTech Connect (OSTI)

    Gadda, E. ); Radice, A. )

    1989-09-01

    The capability of maintaining auxiliary load after a main breaker trip following an emergency in the electric power system is of major concern for any thermoelectric generating unit. In ENEL the reliability of run back to house load of fossil fired units has been greatly improved by adopting a new procedure. Instead of that originally recommended the new procedure allows to trip all fuel input to the boiler and maintains house load operating the turbine on mass and energy stored in the boiler. This procedure was qualified a few years ago and since then is used in the 320 MW units in operation (the main bulk of ENEL's thermal capacity) whether equipped with subcritical once through boilers or with assisted circulation drum boilers. A series of test carried out recently on supercritical 660 MW units have shown that adopting the same procedure these larger units can sustain successfully the run back to house load too. Up to now the new procedure has been used in many other thermal units of size ranging between 70 MW to 240 MW and can be performed in most of ENEL's thermal power plants.

  20. Design-Load Basis for LANL Structures, Systems, and Components

    SciTech Connect (OSTI)

    I. Cuesta

    2004-09-01

    This document supports the recommendations in the Los Alamos National Laboratory (LANL) Engineering Standard Manual (ESM), Chapter 5--Structural providing the basis for the loads, analysis procedures, and codes to be used in the ESM. It also provides the justification for eliminating the loads to be considered in design, and evidence that the design basis loads are appropriate and consistent with the graded approach required by the Department of Energy (DOE) Code of Federal Regulation Nuclear Safety Management, 10, Part 830. This document focuses on (1) the primary and secondary natural phenomena hazards listed in DOE-G-420.1-2, Appendix C, (2) additional loads not related to natural phenomena hazards, and (3) the design loads on structures during construction.

  1. Load responsive hydrodynamic bearing

    DOE Patents [OSTI]

    Kalsi, Manmohan S. (Houston, TX); Somogyi, Dezso (Sugar Land, TX); Dietle, Lannie L. (Stafford, TX)

    2002-01-01

    A load responsive hydrodynamic bearing is provided in the form of a thrust bearing or journal bearing for supporting, guiding and lubricating a relatively rotatable member to minimize wear thereof responsive to relative rotation under severe load. In the space between spaced relatively rotatable members and in the presence of a liquid or grease lubricant, one or more continuous ring shaped integral generally circular bearing bodies each define at least one dynamic surface and a plurality of support regions. Each of the support regions defines a static surface which is oriented in generally opposed relation with the dynamic surface for contact with one of the relatively rotatable members. A plurality of flexing regions are defined by the generally circular body of the bearing and are integral with and located between adjacent support regions. Each of the flexing regions has a first beam-like element being connected by an integral flexible hinge with one of the support regions and a second beam-like element having an integral flexible hinge connection with an adjacent support region. A least one local weakening geometry of the flexing region is located intermediate the first and second beam-like elements. In response to application of load from one of the relatively rotatable elements to the bearing, the beam-like elements and the local weakening geometry become flexed, causing the dynamic surface to deform and establish a hydrodynamic geometry for wedging lubricant into the dynamic interface.

  2. Participant Registration Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    procedures / conduct of operations Participant Registration Procedure Under The "Safety" banner in the JLF Website "Policies and Procedures" Section: Complete Laser Eye Examination. Complete in LTRAIN HS5200-W Laser Safety. Complete in LTRAIN HS4258-W Beryllium (Be) Awareness. Complete in LTRAIN HS4261-W Lead (Pb) Awareness. Complete in LTRAIN HS5229-W Electrical Safety Awareness. Complete in LTRAIN HS-6001-W General Employee Radiological Training. Complete in LTRAIN

  3. Electrical Load Modeling and Simulation

    SciTech Connect (OSTI)

    Chassin, David P.

    2013-01-01

    Electricity consumer demand response and load control are playing an increasingly important role in the development of a smart grid. Smart grid load management technologies such as Grid FriendlyTM controls and real-time pricing are making their way into the conventional model of grid planning and operations. However, the behavior of load both affects, and is affected by load control strategies that are designed to support electric grid planning and operations. This chapter discussed the natural behavior of electric loads, how it interacts with various load control and demand response strategies, what the consequences are for new grid operation concepts and the computing issues these new technologies raise.

  4. Text Delegation Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Procedures for Line Managers' Delegations of Authority when proposing new delegations, redelegating existing delegation, proposing an amendment, rescinding a delegation, and when a delegation is not needed.

  5. NNMCAB Processes and Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    At the January 8, 2014 Committee meeting NNMCAB Staff, Covered the Procedures and Processes that are used in Running the Board.

  6. commercial load | OpenEI Community

    Open Energy Info (EERE)

    data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: applicationzip icon System Advisor Model Tool for Downloading Load Data...

  7. residential load | OpenEI Community

    Open Energy Info (EERE)

    data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: applicationzip icon System Advisor Model Tool for Downloading Load Data...

  8. load profile | OpenEI Community

    Open Energy Info (EERE)

    data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: applicationzip icon System Advisor Model Tool for Downloading Load Data...

  9. Investigation Of Adhesion Formation In New Stainless Steel Trim Spring Operated Pressure Relief Valves

    SciTech Connect (OSTI)

    Gross, Robert E.; Bukowski, Julia V.; Goble, William M.

    2013-04-16

    Examination of proof test data for new (not previously installed) stainless steel (SS) trim spring operated pressure relief valves (SOPRV) reveals that adhesions form between the seat and disc in about 46% of all such SOPRV. The forces needed to overcome these adhesions can be sufficiently large to cause the SOPRV to fail its proof test (FPT) prior to installation. Furthermore, a significant percentage of SOPRV which are found to FPT are also found to ''fail to open'' (FTO) meaning they would not relief excess pressure in the event of an overpressure event. The cases where adhesions result in FTO or FPT appear to be confined to SOPRV with diameters < 1 in and set pressures < 150 psig and the FTO are estimated to occur in 0.31% to 2.00% of this subpopulation of SS trim SOPRV. The reliability and safety implications of these finding for end-users who do not perform pre-installation testing of SOPRV are discussed.

  10. Plug Loads Conservation Measures

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    This software requires inputs of simple plug loads inventory information and calculates the energy and cost benefits of various retrofit opportunities. This tool includes energy conservation measures for: Vending Machine Misers, Delamp Vending Machine, Desktop to Laptop retrofit, CRT to LCD monitors retrofit, Computer Power Management Settings, and Energy Star Refrigerator retrofit. This tool calculates energy savings, demand reduction, cost savings, building life cycle costs including: simple payback, discounted payback, net-present value, and savings tomore » investment ratio. In addition this tool also displays the environmental benefits of a project.« less

  11. Variable loading roller

    DOE Patents [OSTI]

    Williams, D.M.

    1988-01-21

    An automatic loading roller for transmitting torque in traction drive devices in manipulator arm joints includes a two-part camming device having a first cam portion rotatable in place on a shaft by an input torque and a second cam portion coaxially rotatable and translatable having a rotating drive surface thereon for engaging the driven surface of an output roller with a resultant force proportional to the torque transmitted. Complementary helical grooves in the respective cam portions interconnected through ball bearings interacting with those grooves effect the rotation and translation of the second cam portion in response to rotation of the first. 14 figs.

  12. Variable loading roller

    DOE Patents [OSTI]

    Williams, Daniel M. (Oliver Springs, TN)

    1989-01-01

    An automatic loading roller for transmitting torque in traction drive devices in manipulator arm joints includes a two-part camming device having a first cam portion rotatable in place on a shaft by an input torque and a second cam portion coaxially rotatable and translatable having a rotating drive surface thereon for engaging the driven surface of an output roller with a resultant force proportional to the torque transmitted. Complementary helical grooves on the respective cam portions interconnected through ball bearings interacting with those grooves effect the rotation and translation of the second cam portion in response to rotation of the first.

  13. Pressure Relief Devices for High-Pressure Gaseous Storage Systems: Applicability to Hydrogen Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pressure Relief Devices for High-Pressure Gaseous Storage Systems: Applicability to Hydrogen Technology A. Kostival, C. Rivkin, W. Buttner, and R. Burgess National Renewable Energy Laboratory Technical Report NREL/TP-5400-60175 November 2013 NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Operated by the Alliance for Sustainable Energy, LLC This report is available at no cost from the National Renewable Energy Laboratory (NREL) at

  14. Nanomaterial Procedure Checklist

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hammon/C.Patty 2/14/2014 Nanomaterial Procedure Checklist Spokesperson: _________________________________________ Proposal #: ______________ Author: _______________________________________________ Date: ___________________ Sample Holder Description: _______________________________________________________ Nanomaterial Composition: _______________________________________________________ Size: ________ Shape: ________ Quantity: ________ Risk Assessment: Describe any known hazards of the

  15. Text Redelegation Procedures - DOE Directives, Delegations, and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Text Redelegation Procedures by Website Administrator Delegation Procedures Redelegation Procedures Redelegation Procedures for Functional Area Managers This page contains...

  16. ARM - Publications Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govPublicationsPublications Procedures Page Contents Types of ARM Publications Process for Publishing Planning Documents Science Reports Conference Documents Public Information Materials Recommendation for Journal Articles Proper Acknowledgments Publications Procedures Types of ARM Publications There are two main types of publications in ARM: (1) planning documents and (2) science reports. Planning documents include the ARM Program Plan, Science Plan, Locale Recommendation Plan, and Site

  17. Dynamic load balancing of applications

    DOE Patents [OSTI]

    Wheat, Stephen R. (Albuquerque, NM)

    1997-01-01

    An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated.

  18. Dynamic load balancing of applications

    DOE Patents [OSTI]

    Wheat, S.R.

    1997-05-13

    An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers is disclosed. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated. 13 figs.

  19. High-Power Rf Load

    DOE Patents [OSTI]

    Tantawi, Sami G. (San Mateo, CA); Vlieks, Arnold E. (Livermore, CA)

    1998-09-01

    A compact high-power RF load comprises a series of very low Q resonators, or chokes [16], in a circular waveguide [10]. The sequence of chokes absorb the RF power gradually in a short distance while keeping the bandwidth relatively wide. A polarizer [12] at the input end of the load is provided to convert incoming TE.sub.10 mode signals to circularly polarized TE.sub.11 mode signals. Because the load operates in the circularly polarized mode, the energy is uniformly and efficiently absorbed and the load is more compact than a rectangular load. Using these techniques, a load having a bandwidth of 500 MHz can be produced with an average power dissipation level of 1.5 kW at X-band, and a peak power dissipation of 100 MW. The load can be made from common lossy materials, such as stainless steel, and is less than 15 cm in length. These techniques can also produce loads for use as an alternative to ordinary waveguide loads in small and medium RF accelerators, in radar systems, and in other microwave applications. The design is easily scalable to other RF frequencies and adaptable to the use of other lossy materials.

  20. Libra: Scalable Load Balance Analysis

    Energy Science and Technology Software Center (OSTI)

    2009-09-16

    Libra is a tool for scalable analysis of load balance data from all processes in a parallel application. Libra contains an instrumentation module that collects model data from parallel applications and a parallel compression mechanism that uses distributed wavelet transforms to gather load balance model data in a scalable fashion. Data is output to files, and these files can be viewed in a GUI tool by Libra users. The GUI tool associates particular load balancemore » data with regions for code, emabling users to view the load balance properties of distributed "slices" of their application code.« less

  1. Awardee Share Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Awardee Share Procedures Procedures for Correctly Reporting Awardee Share on the FAADS/FAADS Plus reporting screen in STRIPES To ensure proper reporting by DOE to USASpending.gov, you must enter the awardee share (also known as the cost share, recipient share, and non-federal share) manually on the FAADS/FAADS Plus reporting screen in STRIPES. The FAADS/FAADS Plus file is the financial assistance equivalent of the FPDS-NG data entry for acquisition awards. The awardee share amount is not system

  2. Proposal for a Vehicle Level Test Procedure to Measure Air Conditioning Fuel Use: Preprint

    SciTech Connect (OSTI)

    Rugh, J.

    2010-02-01

    A procedure is described to measure approximate real-world air conditioning fuel use and assess the impact of thermal load reduction strategies in plug-in hybrid electric vehicles.

  3. Spring loaded locator pin assembly

    DOE Patents [OSTI]

    Groll, Todd A. (Idaho Falls, ID); White, James P. (Pocatelo, ID)

    1998-01-01

    This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece.

  4. Spring loaded locator pin assembly

    DOE Patents [OSTI]

    Groll, T.A.; White, J.P.

    1998-03-03

    This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece. 5 figs.

  5. Pressure Relief Devices for High-Pressure Gaseous Storage Systems: Applicability to Hydrogen Technology

    SciTech Connect (OSTI)

    Kostival, A.; Rivkin, C.; Buttner, W.; Burgess, R.

    2013-11-01

    Pressure relief devices (PRDs) are viewed as essential safety measures for high-pressure gas storage and distribution systems. These devices are used to prevent the over-pressurization of gas storage vessels and distribution equipment, except in the application of certain toxic gases. PRDs play a critical role in the implementation of most high-pressure gas storage systems and anyone working with these devices should understand their function so they can be designed, installed, and maintained properly to prevent any potentially dangerous or fatal incidents. As such, the intention of this report is to introduce the reader to the function of the common types of PRDs currently used in industry. Since high-pressure hydrogen gas storage systems are being developed to support the growing hydrogen energy infrastructure, several recent failure incidents, specifically involving hydrogen, will be examined to demonstrate the results and possible mechanisms of a device failure. The applicable codes and standards, developed to minimize the risk of failure for PRDs, will also be reviewed. Finally, because PRDs are a critical component for the development of a successful hydrogen energy infrastructure, important considerations for pressure relief devices applied in a hydrogen gas environment will be explored.

  6. Subsea HIPPS design procedure

    SciTech Connect (OSTI)

    Aaroe, R.; Lund, B.F.; Onshus, T.

    1995-12-31

    The paper is based on a feasibility study investigating the possibilities of using a HIPPS (High Integrity Pressure Protection System) to protect a subsea pipeline that is not rated for full wellhead shut-in pressure. The study was called the Subsea OPPS Feasibility Study, and was performed by SINTEF, Norway. Here, OPPS is an acronym for Overpressure Pipeline Protection System. A design procedure for a subsea HIPPS is described, based on the experience and knowledge gained through the ``Subsea OPPS Feasibility Study``. Before a subsea HIPPS can be applied, its technical feasibility, reliability and profitability must be demonstrated. The subsea HIPPS design procedure will help to organize and plan the design activities both with respect to development and verification of a subsea HIPPS. The paper also gives examples of how some of the discussed design steps were performed in the Subsea OPPS Feasibility Study. Finally, further work required to apply a subsea HIPPS is discussed.

  7. DOE Reasonable Accommodation Procedures

    Broader source: Energy.gov [DOE]

    Pursuant to Executive Order 13164, the Department of Energy (hereinafter referred to as the “department”), is charged with establishing written procedures for the facilitation of reasonable accommodation for: (1) individuals with disabilities in the application process for employment with the Department; (2) Department employees with disabilities to perform the essential functions of a position; and (3) Department employees with disabilities to enjoy benefits and privileges of employment equal to those enjoyed by employees without disabilities.

  8. Spinning Reserve from Responsive Load

    SciTech Connect (OSTI)

    Kueck, John D; Kirby, Brendan J; Laughner, T; Morris, K

    2009-01-01

    As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host a spinning reserve test. The Tennessee Valley Authority (TVA) supplied real-time metering and monitoring expertise to record total hotel load during both normal operations and testing. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. The load drop was very rapid, essentially as fast as the 2 second metering could detect.

  9. SAPHIRE 8 Volume 7 - Data Loading

    SciTech Connect (OSTI)

    K. J. Kvarfordt; S. T. Wood; C. L. Smith; S. R. Prescott

    2011-03-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer. SAPHIRE Version 8 is funded by the U.S. Nuclear Regulatory Commission and developed by the Idaho National Laboratory. This report is intended to assist the user to enter PRA data into the SAPHIRE program using the built-in MAR-D ASCII-text file data transfer process. Towards this end, a small sample database is constructed and utilized for demonstration. Where applicable, the discussion includes how the data processes for loading the sample database relate to the actual processes used to load a larger PRA models. The procedures described herein were developed for use with SAPHIRE Version 8. The guidance specified in this document will allow a user to have sufficient knowledge to both understand the data format used by SAPHIRE and to carry out the transfer of data between different PRA projects.

  10. Procedures for Departing Employees | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures for Departing Employees Procedures for Departing Employees Microsoft Office document icon RM Exit Procedures.doc More Documents & Publications Procedures for Departing Employees Records Management Exit Procedures Records Management Exit Procedures

  11. Procedures for Departing Employees | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures for Departing Employees Procedures for Departing Employees PDF icon RM Exit Procedures (2)3.12.12.pdf More Documents & Publications Procedures for Departing Employees Records Management Exit Procedures Records Management Exit Procedures

  12. Sandia Wind Turbine Loads Database

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    The Sandia Wind Turbine Loads Database is divided into six files, each corresponding to approximately 16 years of simulation. The files are text files with data in columnar format. The 424MB zipped file containing six data files can be downloaded by the public. The files simulate 10-minute maximum loads for the NREL 5MW wind turbine. The details of the loads simulations can be found in the paper: Decades of Wind Turbine Loads Simulations, M. Barone, J. Paquette, B. Resor, and L. Manuel, AIAA2012-1288 (3.69MB PDF). Note that the site-average wind speed is 10 m/s (class I-B), not the 8.5 m/s reported in the paper.

  13. Loading and conjugating cavity biostructures

    DOE Patents [OSTI]

    Hainfeld, J.F.

    1997-11-25

    Methods for the preparation and use of a biological delivery system are disclosed. The method of preparation includes the loading of a non-biological material into a biostructure having a load-bearing structure. The method also includes the removal of some of the biostructure`s contents and the loading of a non-biological material into the biostructure. The biostructure is biologically compatible with the host, and preferably is derived from the host, the host`s species or a related species. The loaded biostructure is used directly, or it can be targeted to specific cells, tissues and/or organs within a host. The targeted biostructure can be used to deliver the non-biological material to a specified tissue, organ or cell within a host for diagnostic, therapeutic or other purposes. 11 figs.

  14. Loading and conjugating cavity biostructures

    DOE Patents [OSTI]

    Hainfeld, James F.

    1995-08-22

    Methods for the preparation and use of a biological delivery system are disclosed. The method of preparation includes the loading of a non-biological material into a biostructure having a load-bearing structure. The method also includes the removal of some of the biostructure's contents and the loading of a non-biological material into the biostructure. The biostructure is biologically compatible with the host, and preferably is derived from the host, the host's species or a related species. The loaded biostructure is used directly, or it can be targeted to specific cells, tissues and/or organs within a host. The targeted biostructure can be used to deliver the non-biological material to a specified tissue, organ or cell within a host for diagnostic, therapeutic or other purposes.

  15. Loading and conjugating cavity biostructures

    DOE Patents [OSTI]

    Hainfeld, James F.

    1997-11-25

    Methods for the preparation and use of a biological delivery system are disclosed. The method of preparation includes the loading of a non-biological material into a biostructure having a load-bearing structure. The method also includes the removal of some of the biostructure's contents and the loading of a non-biological material into the biostructure. The biostructure is biologically compatible with the host, and preferably is derived from the host, the host's species or a related species. The loaded biostructure is used directly, or it can be targeted to specific cells, tissues and/or organs within a host. The targeted biostructure can be used to deliver the non-biological material to a specified tissue, organ or cell within a host for diagnostic, therapeutic or other purposes.

  16. Loading and conjugating cavity biostructures

    DOE Patents [OSTI]

    Hainfeld, J.F.

    1995-08-22

    Methods for the preparation and use of a biological delivery system are disclosed. The method of preparation includes the loading of a non-biological material into a biostructure having a load-bearing structure. The method also includes the removal of some of the biostructure`s contents and the loading of a non-biological material into the biostructure. The biostructure is biologically compatible with the host, and preferably is derived from the host, the host`s species or a related species. The loaded biostructure is used directly, or it can be targeted to specific cells, tissues and/or organs within a host. The targeted biostructure can be used to deliver the non-biological material to a specified tissue, organ or cell within a host for diagnostic, therapeutic or other purposes. 11 figs.

  17. Redelegation Procedures - DOE Directives, Delegations, and Requirement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Breadcrumb >> Breadcrumb Redelegation Procedures by Website Administrator Text version available here. Delegation Procedures Re-Delegation Procedures Document Actions Redelegation...

  18. The Effects of Maintenance Actions on the PFDavg of Spring Operated Pressure Relief Valves

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Harris, S.; Gross, R.; Goble, W; Bukowski, J

    2015-12-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accountedmore » for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.« less

  19. The Effects of Maintenance Actions on the PFDavg of Spring Operated Pressure Relief Valves

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.; Goble, W; Bukowski, J

    2015-12-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

  20. THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.

    2014-04-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

  1. Structural assessment of accident loads

    SciTech Connect (OSTI)

    Wagenblast, G.R., Westinghouse Hanford

    1996-05-28

    Structural assessments were made for specific accident loads for specific catch, receiver, and storage tanks. The evaluation herein represents level-of-effort order-of-magnitude estimates of limiting loads that would lead to collapse or rupture of the tank and unmitigated loss of confinement for the waste. Structural capacities were established using failure criteria. Compliance with codes such as ACI, ASCE, ASME, RCRA, UBC, WAC, and DOE Orders was `NOT` maintained. Normal code practice is to prevent failure with margins consistent with expected variations in loads and strengths and confidence in analysis techniques. The evaluation herein represent estimates of code limits without code load factors or code strength reduction factors, and loading beyond such a limit is considered as an onset of some failure mode. The exact nature of the failure mode and its relation to a safe condition is a judgment of the analyst. Consequently, these `RESULTS SHALL NOT BE USED TO ESTABLISH OPERATING OR SAFETY LOAD LIMITS FOR THESE TANKS`.

  2. LSU/CAMD Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedure Doc. ID: EM-PR-0001-001.doc Emergency Date: 2014/04/15 1. Safety is the responsibility of all working at CAMD. 2. Display this document at all beamlines, hutches, control room, laboratories and cleanrooms. 3. Report all unsafe acts or processes immediately to the CAMD Safety Office, by dialing 8-4616 from any facility phone or paging the CAMD Safety Officer: 9-952-5892 4. Injuries must be reported if medical intervention (physician) is or has been required. Fill out accident report

  3. Surface cleanliness measurement procedure

    DOE Patents [OSTI]

    Schroder, Mark Stewart; Woodmansee, Donald Ernest; Beadie, Douglas Frank

    2002-01-01

    A procedure and tools for quantifying surface cleanliness are described. Cleanliness of a target surface is quantified by wiping a prescribed area of the surface with a flexible, bright white cloth swatch, preferably mounted on a special tool. The cloth picks up a substantial amount of any particulate surface contamination. The amount of contamination is determined by measuring the reflectivity loss of the cloth before and after wiping on the contaminated system and comparing that loss to a previous calibration with similar contamination. In the alternative, a visual comparison of the contaminated cloth to a contamination key provides an indication of the surface cleanliness.

  4. Text Delegation Procedures - DOE Directives, Delegations, and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Text Delegation Procedures Delegation Procedures Re-Delegation Procedures by Website Administrator Procedures for Line Managers' Delegations of Authority when proposing new...

  5. The effects of load drop, uniform load and concentrated loads on waste tanks

    SciTech Connect (OSTI)

    Marusich, R.M., Westinghouse Hanford

    1996-09-06

    This document provides the supporting calculations performed by others specifically for the TWRS FSAR and more detailed summaries of the important references issued in the past regarding the effects of various loads.

  6. The effects of load drop, uniform load and concentrated loads on waste tanks

    SciTech Connect (OSTI)

    Marusich, R.M.

    1996-09-27

    This document provides the supporting calculations performed by others specifically for the TWRS FSAR and more detailed summaries of the important references issued in the past regarding the effects of various loads.

  7. building load | OpenEI Community

    Open Energy Info (EERE)

    building load Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 13:03 Commercial and Residential Hourly Load Data Now Available on OpenEI building load...

  8. load data | OpenEI Community

    Open Energy Info (EERE)

    load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI building load building...

  9. electric load data | OpenEI Community

    Open Energy Info (EERE)

    electric load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI building load...

  10. building load data | OpenEI Community

    Open Energy Info (EERE)

    building load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI building load...

  11. Determining Electric Motor Load and Efficiency

    Broader source: Energy.gov [DOE]

    To compare the operating costs of an existing standard motor with an appropriately-sized energy-efficient replacement, you need to determine operating hours, efficiency improvement values, and load. Part-load is a term used to describe the actual load served by the motor as compared to the rated full-load capability of the motor. Motor part-loads may be estimated through using input power, amperage, or speed measurements. This fact sheet briefly discusses several load estimation techniques.

  12. The load-shedding scheme design for an integrated steelmaking cogeneration facility

    SciTech Connect (OSTI)

    Hsu, C.T.; Chen, C.S.; Chen, J.K.

    1997-05-01

    This paper develops the coordination of a load-shedding scheme for a large industrial customer with several cogenerator units. A detailed description of each design procedure is included. The loads are tripped by the underfrequency relays, to prevent the power system from collapse when the plant becomes isolated, due to a utility service outage. Different system fault cases have been selected to derive the proper formulation of a load-shedding scheme, according to the historical operation records. The key factors, such as frequency settings, number of load-shedding steps, size and location of the loads to be tripped, relay time delay, and the coordination with the generator protection scheme, were examined through the simulation of the transient stability program. The proper load-shedding scheme has been designed, and the related hardware has been installed in the plant, to keep the system from blackout when the disturbance occurs.

  13. Self-aligning biaxial load frame

    DOE Patents [OSTI]

    Ward, M.B.; Epstein, J.S.; Lloyd, W.R.

    1994-01-18

    An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed cross head, and by alignment and linear motion elements of one load assembly relative to the load frame. 3 figures.

  14. Load Participation in Ancillary Services Workshop Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    controls on the load-side is growing. Driven by improved and widely available communications systems, load participation is becoming easier and more reliable; and there...

  15. Sandia Energy - Sandia Wind Turbine Loads Database

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sandia Wind Turbine Loads Database Home Stationary Power Energy Conversion Efficiency Wind Energy Resources Wind Software Downloads Sandia Wind Turbine Loads Database Sandia Wind...

  16. Load Leveling Battery System Costs

    Energy Science and Technology Software Center (OSTI)

    1994-10-12

    SYSPLAN evaluates capital investment in customer side of the meter load leveling battery systems. Such systems reduce the customer's monthly electrical demand charge by reducing the maximum power load supplied by the utility during the customer's peak demand. System equipment consists of a large array of batteries, a current converter, and balance of plant equipment and facilities required to support the battery and converter system. The system is installed on the customer's side of themore » meter and controlled and operated by the customer. Its economic feasibility depends largely on the customer's load profile. Load shape requirements, utility rate structures, and battery equipment cost and performance data serve as bases for determining whether a load leveling battery system is economically feasible for a particular installation. Life-cycle costs for system hardware include all costs associated with the purchase, installation, and operation of battery, converter, and balance of plant facilities and equipment. The SYSPLAN spreadsheet software is specifically designed to evaluate these costs and the reduced demand charge benefits; it completes a 20 year period life cycle cost analysis based on the battery system description and cost data. A built-in sensitivity analysis routine is also included for key battery cost parameters. The life cycle cost analysis spreadsheet is augmented by a system sizing routine to help users identify load leveling system size requirements for their facilities. The optional XSIZE system sizing spreadsheet which is included can be used to identify a range of battery system sizes that might be economically attractive. XSIZE output consisting of system operating requirements can then be passed by the temporary file SIZE to the main SYSPLAN spreadsheet.« less

  17. PRB rail loadings shatter record

    SciTech Connect (OSTI)

    Buchsbaum, L.

    2008-09-15

    Rail transport of coal in the Powder River Basin has expanded, with a record 2,197 trains loaded in a month. Arch Coal's Thunder basin mining complex has expanded by literally bridging the joint line railway. The dry fork mine has also celebrated its safety achievements. 4 photos.

  18. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    SciTech Connect (OSTI)

    Blackaby, W.B.

    1997-09-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays.

  19. An analysis of representative heating load lines for residential HSPF ratings

    SciTech Connect (OSTI)

    Rice, C. Keith; Shen, Bo; Shrestha, Som S.

    2015-07-01

    This report describes an analysis to investigate representative heating loads for single-family detached homes using current EnergyPlus simulations (DOE 2014a). Hourly delivered load results are used to determine binned load lines using US Department of Energy (DOE) residential prototype building models (DOE 2014b) developed by Pacific Northwest National Laboratory (PNNL). The selected residential single-family prototype buildings are based on the 2006 International Energy Conservation Code (IECC 2006) in the DOE climate regions. The resulting load lines are compared with the American National Standards Institute (ANSI)/Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Standard 210/240 (AHRI 2008) minimum and maximum design heating requirement (DHR) load lines of the heating seasonal performance factor (HSPF) ratings procedure for each region. The results indicate that a heating load line closer to the maximum DHR load line, and with a lower zero load ambient temperature, is more representative of heating loads predicted for EnergyPlus prototype residential buildings than the minimum DHR load line presently used to determine HSPF ratings. An alternative heating load line equation was developed and compared to binned load lines obtained from the EnergyPlus simulation results. The effect on HSPF of the alternative heating load line was evaluated for single-speed and two-capacity heat pumps, and an average HSPF reduction of 16% was found. The alternative heating load line relationship is tied to the rated cooling capacity of the heat pump based on EnergyPlus autosizing, which is more representative of the house load characteristics than the rated heating capacity. The alternative heating load line equation was found to be independent of climate for the six DOE climate regions investigated, provided an adjustable zero load ambient temperature is used. For Region IV, the default DOE climate region used for HSPF ratings, the higher load line results in an ~28% increase in delivered heating load and an ~52% increase in the estimated heating operating cost over that given in the AHRI directory (AHRI 2014).

  20. Records Management Exit Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exit Procedures Records Management Exit Procedures The purpose of this brochure is to provide records exit procedures for Federal and contractor employees who are departing on a permanent basis or for an extended period of time for military, medical, or disability leave. PDF icon Records Management Exit Procedures More Documents & Publications Records Management Exit Procedures Procedures for Departing Employees Procedures for Departing Employees

  1. Karen Nunez, Procedures Center Manager

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Karen Nunez, Procedures Center Manager Print Procedures Center Manager Karen Nunez has been working somewhat "behind the scenes" at the ALS for the past seven years, ensuring that documentation for the many procedures involved in ALS operations is clear, correct, and up to date. She works with a plethora of ALS engineers, operators, technicians, and scientists, who all lend their technical expertise to her work. "I maintain the documents that help people maintain the

  2. Project Analysis Standard Operating Procedure

    Energy Savers [EERE]

    and Project Analysis Standard Operating Procedure (EPASOP) Issued by Office of Acquisition and Project Management MA-63 March 12, 2014 DEPARTMENT OF ENERGY Office of Acquisition and Project Management (OAPM) EVMS & PROJECT ANALYSIS SOP MARCH 2014 ii Earned Value Management System (EVMS) and Project Analysis Standard Operating Procedure (EPASOP) OPR: MA-63 March 2014 1. PURPOSE. This EVMS and Project Analysis Standard Operating Procedure (EPASOP) will serve as a primary reference for MA-631

  3. Project Analysis Standard Operating Procedure

    Office of Environmental Management (EM)

    Standard Operating Procedure (EPASOP) Issued by Office of Acquisition and Project Management MA-63 March 12, 2014 DEPARTMENT OF ENERGY Office of Acquisition and Project...

  4. Environmental Management (EM) Quality Procedures

    Broader source: Energy.gov [DOE]

    Formal EM Quality Procedures that assist the Office of Standards and Quality Assurance personnel during the execution and operation of its activities.

  5. Spinning Reserve From Responsive Loads

    SciTech Connect (OSTI)

    Kirby, B.J.

    2003-04-08

    Responsive load is the most underutilized reliability resource available to the power system today. It is currently not used at all to provide spinning reserve. Historically there were good reasons for this, but recent technological advances in communications and controls have provided new capabilities and eliminated many of the old obstacles. North American Electric Reliability Council (NERC), Federal Energy Regulatory Commission (FERC), Northeast Power Coordinating Council (NPCC), New York State Reliability Council (NYSRC), and New York Independent System Operator (NYISO) rules are beginning to recognize these changes and are starting to encourage responsive load provision of reliability services. The Carrier ComfortChoice responsive thermostats provide an example of these technological advances. This is a technology aimed at reducing summer peak demand through central control of residential and small commercial air-conditioning loads. It is being utilized by Long Island Power Authority (LIPA), Consolidated Edison (ConEd), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E). The technology is capable of delivering even greater response in the faster spinning reserve time frame (while still providing peak reduction). Analysis of demand reduction testing results from LIPA during the summer of 2002 provides evidence to back up this claim. It also demonstrates that loads are different from generators and that the conventional wisdom, which advocates for starting with large loads as better ancillary service providers, is flawed. The tempting approach of incrementally adapting ancillary service requirements, which were established when generators were the only available resources, will not work. While it is easier for most generators to provide replacement power and non-spinning reserve (the slower response services) than it is to supply spinning reserve (the fastest service), the opposite is true for many loads. Also, there is more financial reward for supplying spinning reserve than for supplying the other reserve services as a result of the higher spinning reserve prices. The LIPAedge program (LIPA's demand reduction program using Carrier ComfortChoice thermostats) provides an opportunity to test the use of responsive load for spinning reserve. With potentially 75 MW of spinning reserve capability already installed, this test program can also make an important contribution to the capacity needs of Long Island during the summer of 2003. Testing could also be done at ConEd ({approx}30 MW), SCE ({approx}15 MW), and/or SDG&E ({approx}15 MW). This paper is divided into six chapters. Chapter 2 discusses the contingency reserve ancillary services, their functions in supporting power system reliability, and their technical requirements. It also discusses the policy and tariff requirements and attempts to distinguish between ones that are genuinely necessary and ones that are artifacts of the technologies that were historically used to provide the services. Chapter 3 discusses how responsive load could provide contingency reserves (especially spinning reserve) for the power system. Chapter 4 specifically discusses the Carrier ComfortChoice responsive thermostat technology, the LIPAedge experience with that technology, and how the technology could be used to supply spinning reserve. Chapter 5 discusses a number of unresolved issues and suggests areas for further research. Chapter 6 offers conclusions and recommendations.

  6. Sandia Wind Turbine Loads Database

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Turbine Loads Database - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced

  7. Delegation Procedures - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Breadcrumb >> Breadcrumb Delegation Procedures by Website Administrator Text Delegation Procedures - by Website Administrator - last modified Mar 23, 2015 11:12 AM Procedures for...

  8. PASSIVE DETECTION OF VEHICLE LOADING

    SciTech Connect (OSTI)

    Garrett, A.

    2012-01-03

    The Digital Imaging and Remote Sensing Laboratory (DIRS) at the Rochester Institute of Technology, along with the Savannah River National Laboratory is investigating passive methods to quantify vehicle loading. The research described in this paper investigates multiple vehicle indicators including brake temperature, tire temperature, engine temperature, acceleration and deceleration rates, engine acoustics, suspension response, tire deformation and vibrational response. Our investigation into these variables includes building and implementing a sensing system for data collection as well as multiple full-scale vehicle tests. The sensing system includes; infrared video cameras, triaxial accelerometers, microphones, video cameras and thermocouples. The full scale testing includes both a medium size dump truck and a tractor-trailer truck on closed courses with loads spanning the full range of the vehicle's capacity. Statistical analysis of the collected data is used to determine the effectiveness of each of the indicators for characterizing the weight of a vehicle. The final sensing system will monitor multiple load indicators and combine the results to achieve a more accurate measurement than any of the indicators could provide alone.

  9. Where does streamwater come from in low-relief forested watersheds? A dual-isotope approach

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Klaus, J.; McDonnell, J. J.; Jackson, C. R.; Du, E.; Griffiths, N. A.

    2015-01-08

    The time and geographic sources of streamwater in low-relief watersheds are poorly understood. This is partly due to the difficult combination of low runoff coefficients and often damped streamwater isotopic signals precluding traditional hydrograph separation and convolution integral approaches. Here we present a dual-isotope approach involving 18O and 2H of water in a low-angle forested watershed to determine streamwater source components and then build a conceptual model of streamflow generation. We focus on three headwater lowland sub-catchments draining the Savannah River Site in South Carolina, USA. Our results for a 3-year sampling period show that the slopes of the meteoricmore » water lines/evaporation water lines (MWLs/EWLs) of the catchment water sources can be used to extract information on runoff sources in ways not considered before. Our dual-isotope approach was able to identify unique hillslope, riparian and deep groundwater, and streamflow compositions. Thus, the streams showed strong evaporative enrichment compared to the local meteoric water line (δ2H = 7.15 · δ18O +9.28‰) with slopes of 2.52, 2.84, and 2.86. Based on the unique and unambiguous slopes of the EWLs of the different water cycle components and the isotopic time series of the individual components, we were able to show how the riparian zone controls baseflow in this system and how the riparian zone "resets" the stable isotope composition of the observed streams in our low-angle, forested watersheds. Although this approach is limited in terms of quantifying mixing percentages between different end-members, our dual-isotope approach enabled the extraction of hydrologically useful information in a region with little change in individual isotope time series.« less

  10. Minimizing damage to a propped fracture by controlled flowback procedures

    SciTech Connect (OSTI)

    Robinson, B.M.; Holditch, S.A.; Whitehead, W.S.

    1988-06-01

    Severe fracture-conductivity damage can result from proppant crushing and/or proppant flowback into the wellbore. Such damage is often concentrated near the wellbore and can directly affect postfracture performance. Most of the time severe fracture-conductivity damage can be minimized by choosing the correct type of proppant for a particular well. In many cases, however, this is not enough. To minimize excessive crushing or to prevent proppant flowback, it is also necessary to control carefully the flowback of the well after the treatment. Specific procedures can be followed to minimize severe fracture-conductivity damage. These procedures involve controlling the rates at which load fluids are recovered and maximizing backpressure against the formation. These procedures require much more time and effort than is normally spent on postfracture cleanup; however, the efforts could result in better performance.

  11. Analysis of Flow in Pilot Operated Safety and Relief Valve of Nuclear Reactor Coolant System

    SciTech Connect (OSTI)

    Kwon, Soon-Bum; Lee, Dong-Won; Kim, In-Goo; Ahn, Hyung-Joon; Kim, Hho-Jung

    2004-07-01

    When the POSRV equipped in a nuclear power plant opens in instant by a failure in coolant system of PWR, a moving shock wave generates, and propagates downstream of the valve, inducing a complicated unsteadiness. The moving shock wave may exert severe load to the structure. In this connection, a method of gradual opening of the valve is used to reduce the load acting on the wall at the downstream of the POSRV. In the present study, experiments and calculations are performed to investigate the detail unsteady flow at the various pipe units and the effect of valve opening time on the flow downstream of the valve. In calculation by using of air as working fluid, 2-dimensional, unsteady compressible Navier-Stokes equations are solved by finite volume method. It was found that when the incident shock wave passes through the pipe unit, it may experience diffraction, reflection and interaction with a vortex. Furthermore, the geometry of the pipe unit affects the reflection type of shock wave and changes the load acting on the wall of pipe unit. It was also turned out that the maximum force acting on the wall of the pipe unit becomes in order of T-junction, 108 deg. elbow and branch in magnitude, respectively. And, the results obtained that show that the rapid pressure rise due to the moving shock wave by instant POSRV valve opening is attenuated by employing the gradual opening. (authors)

  12. In situ atomic force microscope study of high-temperature untwinning surface relief in Mn-Fe-Cu antiferromagnetic shape memory alloy

    SciTech Connect (OSTI)

    Wang, L.; Cui, Y. G.; Wan, J. F.; Rong, Y. H.; Zhang, J. H.; Jin, X.; Cai, M. M.

    2013-05-06

    The N-type untwinning surface relief associated with the fcc {r_reversible} fct martensitic transformation (MT) was observed in the Mn{sub 81.5}Fe{sub 14.0}Cu{sub 4.5} antiferromagnetic high-temperature shape memory alloy (SMA) by in situ atomic force microscopy. The measured untwinning relief angles ({theta}{sub {alpha}} Double-Vertical-Line {theta}{sub {beta}}) at the ridge and at the valley were different, and both angles were less than the conventional values. The surface relief exhibited good reversibility during heating and cooling because of the crystallographic reversibility of thermal-elastic SMAs. Untwinning shear was proposed as the main mechanism of the N-type surface relief. The order of the reverse MT was discussed based on the experimental measurements.

  13. External Independent Review (EIR) Standard Operating Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure...

  14. Determining Electric Motor Load and Efficiency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DETERMINING ELECTRIC MOTOR LOAD AND EFFICIENCY Most likely your operation's motors account for a large part of your monthly electric bill. Far too often motors are mismatched-or oversized-for the load they are intended to serve, or have been re- wound multiple times. To compare the operating costs of an existing standard motor with an appropriately-sized energy- efficient replacement, you need to determine operating hours, efficiency improvement values, and load. Part-load is a term used to

  15. Plug Load Behavioral Change Demonstration Project

    SciTech Connect (OSTI)

    Metzger, I.; Kandt, A.; VanGeet, O.

    2011-08-01

    This report documents the methods and results of a plug load study of the Environmental Protection Agency's Region 8 Headquarters in Denver, Colorado, conducted by the National Renewable Energy Laboratory. The study quantified the effect of mechanical and behavioral change approaches on plug load energy reduction and identified effective ways to reduce plug load energy. Load reduction approaches included automated energy management systems and behavioral change strategies.

  16. High loading uranium fuel plate

    DOE Patents [OSTI]

    Wiencek, Thomas C.; Domagala, Robert F.; Thresh, Henry R.

    1990-01-01

    Two embodiments of a high uranium fuel plate are disclosed which contain a meat comprising structured uranium compound confined between a pair of diffusion bonded ductile metal cladding plates uniformly covering the meat, the meat having a uniform high fuel loading comprising a content of uranium compound greater than about 45 Vol. % at a porosity not greater than about 10 Vol. %. In a first embodiment, the meat is a plurality of parallel wires of uranium compound. In a second embodiment, the meat is a dispersion compact containing uranium compound. The fuel plates are fabricated by a hot isostatic pressing process.

  17. Automated fuel pin loading system

    DOE Patents [OSTI]

    Christiansen, David W. (Kennewick, WA); Brown, William F. (West Richland, WA); Steffen, Jim M. (Richland, WA)

    1985-01-01

    An automated loading system for nuclear reactor fuel elements utilizes a gravity feed conveyor which permits individual fuel pins to roll along a constrained path perpendicular to their respective lengths. The individual lengths of fuel cladding are directed onto movable transports, where they are aligned coaxially with the axes of associated handling equipment at appropriate production stations. Each fuel pin can be reciprocated axially and/or rotated about its axis as required during handling steps. The fuel pins are inserted as a batch prior to welding of end caps by one of two disclosed welding systems.

  18. Quality Procedure - Audits | Department of Energy

    Energy Savers [EERE]

    Audits Quality Procedure - Audits This procedure establishes the responsibilities and process for scheduling, planning, performing, and reporting Quality Assurance (QA) audits of EM-QA-001, Environmental Management Quality Assurance Program implementation at EM Headquarters and Field Office programs, facilities and projects. PDF icon Quality Procedure - Audits More Documents & Publications Quality Procedure - Document Control Quality Procedure - Supplier Qualification Quality Procedure -

  19. Quality Procedure - Document Control | Department of Energy

    Energy Savers [EERE]

    Control Quality Procedure - Document Control This procedure establishes the responsibilities and process for preparing, managing, and revising EM Headquarters Office of Standards and Quality Assurance controlled documents in accordance with EM-QA-001, Environmental Management Quality Assurance Program. PDF icon Quality Procedure - Document Control More Documents & Publications Quality Procedure - Supplier Qualification Quality Procedure - Approved Suppliers List Quality Procedure - Records

  20. Specified assurance level sampling procedure

    SciTech Connect (OSTI)

    Willner, O.

    1980-11-01

    In the nuclear industry design specifications for certain quality characteristics require that the final product be inspected by a sampling plan which can demonstrate product conformance to stated assurance levels. The Specified Assurance Level (SAL) Sampling Procedure has been developed to permit the direct selection of attribute sampling plans which can meet commonly used assurance levels. The SAL procedure contains sampling plans which yield the minimum sample size at stated assurance levels. The SAL procedure also provides sampling plans with acceptance numbers ranging from 0 to 10, thus, making available to the user a wide choice of plans all designed to comply with a stated assurance level.

  1. System and method employing a minimum distance and a load feature database to identify electric load types of different electric loads

    DOE Patents [OSTI]

    Lu, Bin; Yang, Yi; Sharma, Santosh K; Zambare, Prachi; Madane, Mayura A

    2014-12-23

    A method identifies electric load types of a plurality of different electric loads. The method includes providing a load feature database of a plurality of different electric load types, each of the different electric load types including a first load feature vector having at least four different load features; sensing a voltage signal and a current signal for each of the different electric loads; determining a second load feature vector comprising at least four different load features from the sensed voltage signal and the sensed current signal for a corresponding one of the different electric loads; and identifying by a processor one of the different electric load types by determining a minimum distance of the second load feature vector to the first load feature vector of the different electric load types of the load feature database.

  2. APS high heat load monochromator

    SciTech Connect (OSTI)

    Lee, W.K.; Mills, D.

    1993-02-01

    This document contains the design specifications of the APS high heat load (HHL) monochromator and associated accessories as of February 1993. It should be noted that work is continuing on many parts of the monochromator including the mechanical design, crystal cooling designs, etc. Where appropriate, we have tried to add supporting documentation, references to published papers, and calculations from which we based our decisions. The underlying philosophy behind performance specifications of this monochromator was to fabricate a device that would be useful to as many APS users as possible, that is, the design should be as generic as possible. In other words, we believe that this design will be capable of operating on both bending magnet and ID beamlines (with the appropriate changes to the cooling and crystals) with both flat and inclined crystal geometries and with a variety of coolants. It was strongly felt that this monochromator should have good energy scanning capabilities over the classical energy range of about 4 to 20 keywith Si (111) crystals. For this reason, a design incorporating one rotation stage to drive both the first and second crystals was considered most promising. Separate rotary stages for the first and second crystals can sometimes provide more flexibility in their capacities to carry heavy loads (for heavily cooled first crystals or sagittal benders of second crystals), but their tuning capabilities were considered inferior to the single axis approach.

  3. Low reflectance radio frequency load

    DOE Patents [OSTI]

    Ives, R. Lawrence; Mizuhara, Yosuke M

    2014-04-01

    A load for traveling microwave energy has an absorptive volume defined by cylindrical body enclosed by a first end cap and a second end cap. The first end cap has an aperture for the passage of an input waveguide with a rotating part that is coupled to a reflective mirror. The inner surfaces of the absorptive volume consist of a resistive material or are coated with a coating which absorbs a fraction of incident RF energy, and the remainder of the RF energy reflects. The angle of the reflector and end caps is selected such that reflected RF energy dissipates an increasing percentage of the remaining RF energy at each reflection, and the reflected RF energy which returns to the rotating mirror is directed to the back surface of the rotating reflector, and is not coupled to the input waveguide. Additionally, the reflector may have a surface which generates a more uniform power distribution function axially and laterally, to increase the power handling capability of the RF load. The input waveguide may be corrugated for HE11 mode input energy.

  4. 1993 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1993-12-01

    The Loads and Resources Study is presented in three documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The forecasted future electricity demands -- firm loads -- are subtracted from the projected capability of existing and {open_quotes}contracted for{close_quotes} resources to determine whether Bonneville Power Administration (BPA) and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, and additional conservation, contract purchases, or generating resources will be needed to meet load growth. The Pacific Northwest Loads and Resources Study analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resource in addition to the Federal system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. This study presents the Federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1994--95 through 2003--04.

  5. Forrestal Security and Safety Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1983-02-02

    To establish uniform procedures for the security and safety of the Forrestal Building and to inform all personnel of precautionary measures. This directive does not cancel another directive. Canceled by DOE N 251.11.

  6. Surface Environmental Surveillance Procedures Manual

    SciTech Connect (OSTI)

    Hanf, RW; Dirkes, RL

    1990-02-01

    This manual establishes the procedures for the collection of environmental samples and the performance of radiation surveys and other field measurements. Responsibilities are defined for those personnel directly involved in the collection of samples and the performance of field measurements.

  7. High payload six-axis load sensor

    DOE Patents [OSTI]

    Jansen, John F. (Knoxville, TN); Lind, Randall F. (Knoxville, TN)

    2003-01-01

    A repairable high-payload six-axis load sensor includes a table, a base, and at least three shear-pin load transducers removably mounted between the table and the base. Removable mounting permits easy replacement of damaged shear pins. Preferably, the shear-pin load transducers are responsive to shear forces imparted along the two axes perpendicular to an axis of minimum sensitivity characteristic of the transducer. Responsive to an applied shear force, each shear-pin load transducer can produce an electrical signal proportional to the reaction force. The load sensor can further include a structure for receiving the proportional electrical signals and computing the applied load corresponding to the proportional electrical signals. The computed load can be expressed in terms of a three-dimensional XYZ Cartesian coordinate system.

  8. REM Handling Procedures | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    REM Handling Procedures Below are recommended handling procedures for the Rare Earth Metals. Keep in mind that these procedures are intended for very high purity metals, and alternative procedures may exist or be better suited to your facilities' capabilities. Please consult with your safety officer(s) before employing any of these procedures. The procedures are grouped by element: La, Ce, Pr & Nd Sc, Y, Gd, Tb, Dy, Ho, Er, Tm and Lu Sm & Yb Eu RECOMMENDED HANDLING PROCEDURES FOR: La,

  9. High voltage load resistor array

    DOE Patents [OSTI]

    Lehmann, Monty Ray (Smithfield, VA)

    2005-01-18

    A high voltage resistor comprising an array of a plurality of parallel electrically connected resistor elements each containing a resistive solution, attached at each end thereof to an end plate, and about the circumference of each of the end plates, a corona reduction ring. Each of the resistor elements comprises an insulating tube having an electrode inserted into each end thereof and held in position by one or more hose clamps about the outer periphery of the insulating tube. According to a preferred embodiment, the electrode is fabricated from stainless steel and has a mushroom shape at one end, that inserted into the tube, and a flat end for engagement with the end plates that provides connection of the resistor array and with a load.

  10. Bulk Modulus Capacitor Load Cells

    SciTech Connect (OSTI)

    Dickey, C.E.

    1990-04-01

    Measurement of forces present at various locations within the SSC Model Dipole collared coil assembly is of great practical interest to development engineers. Of particular interest are the forces between coils at the parting plane and forces that exist between coils and pole pieces. It is also desired to observe these forces under the various conditions that a magnet will experience such as: during the collaring process, post-collaring, under the influence of cryogens, and during field excitation. A twenty eight thousandths of an inch thick capacitor load cell which utilizes the hydrostatic condition of a stressed plastic dielectric has been designed. These cells are currently being installed on SSC Model Dipoles. The theory, development, and application of these cells will be discussed.

  11. peak_load_2010.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    2. Noncoincident Peak Load, by North American Electric Reliability Corporation Assessment Area, 1990-2010 Actual, 2011-2015 Projected (Megawatts) Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 FRCC 27,266 28,818 30,601 32,823 32,904 34,524 35,444 35,375 38,730 37,493 37,194 39,062 40,696 40,475 42,383 46,396 45,751 46,676 44,836 NPCC 44,116 46,594 43,658 46,706 47,581 47,705 45,094 49,269 49,566 52,855

  12. Discussion series on PURPA related topics: load management

    SciTech Connect (OSTI)

    Sturgeon, J I

    1980-08-01

    The Discussion Series on PURPA Related Topics is composed of five volumes: Metering, Billing, Information to Customers, Load Management Techniques and Master Metering. These reports are based on twenty-five Demonstration and Implementation projects sponsored and directed during the past five years by the US Department of Energy, Office of Utility Systems. Each of the topics bears directly on one or more of the federal standards contained in the Public Utilities Regulatory Policies Act of 1978 (PURPA). This volume, Load Management Techniques, relates primarily to the Time-of-Day rates standard, PURPA IB(d)3. The experiences related in this report deal, in part, with the procedures and equipment which are affected when time-of-day rates are implemented. One goal of this report is to describe how people in a variety of settings have dealt with the many practical issues in load management. Another is to highlight the lessons and summarize the experiences of the Project participants. This report does not stand as a manual nor provide prescriptive guidelines on how to deal with the topic. Rather it offers an account for those charged with the responsibility of implementing PURPA requirements to learn from the insights and problems which occurred during the Rate Demonstration projects.

  13. Quality Procedure - Supplier Qualification | Department of Energy

    Energy Savers [EERE]

    Supplier Qualification Quality Procedure - Supplier Qualification This procedure establishes the responsibilities and process for supplier qualification activities conducted by Environmental Management (EM) Headquarters (HQ) Office of Standards and Quality Assurance in accordance with EM-QA-001, Environmental Management Quality Assurance Program. PDF icon Quality Procedure - Supplier Qualification More Documents & Publications Quality Procedure - Approved Suppliers List Quality Procedure -

  14. Spinning Reserve from Pump Load: A Technical Findings Report to the California Department of Water Resources

    SciTech Connect (OSTI)

    Kirby, BJ

    2005-05-06

    The Oak Ridge National Laboratory (ORNL), at the request of the California Energy Commission and the U.S. Department of Energy, is investigating opportunities for electrical load to provide the ancillary service of spinning reserve to the electric grid. The load would provide this service by stopping for a short time when there is a contingency on the grid such as a transmission line or generator outage. There is a possibility that a significant portion of the California Independent System Operator's (CAISO's) spinning reserve requirement could be supplied from the California Department of Water Resources (CDWR) pumping load. Spinning reserve has never been supplied from load before, and rule changes would be needed to allow it. In this report, we are presenting technical findings on the possibility of supplying spinning reserve from pumping system load. In parallel, we are pursuing the needed rule changes with the North American Electric Reliability Council (NERC), the Federal Energy Regulatory Commission (FERC), the Western Electricity Coordinating Council (WECC), and the CAISO. NERC and FERC have agreed that they have no prohibition against supplying spinning reserve from load. The WECC Minimum Operability Reliability Criteria working group has agreed that the concept should be considered, and they are presently discussing the needed tariff and rule changes. Presently, spinning reserve is provided by generation that is actually spinning but is operating at low power levels and can be ramped up quickly to provide reserve power. In a sense, this is an inefficient and environmentally unfriendly way of providing reserves because it requires the generator to operate at a low power level that may be inefficient and may discharge more pollutants per kW than operating at rated power. It would be better if this generation capacity were in a position to bid into the energy market. Providing an additional supply of spinning reserve would tend to reduce prices for both reserves and the regular electric energy market. The CAISO is presently in the process of redesigning its market rules for ancillary services. The time is right to pursue this opportunity to supply spinning reserve from load. It is our hope that the CDWR will endorse this recommendation. ORNL will then work with FERC, NERC, WECC, and the CAISO to obtain the needed rule changes. This project would provide the CDWR with another option in the complex process of obtaining its energy at the lowest possible cost, while at the same time providing more flexibility to the ISO and relief to the energy market. After this project is implemented in California, we hope that the practice spreads across the nation, allowing much more flexibility in energy markets and increasing the availability of reserve services.

  15. Simplified Space Conditioning in Low Load Homes

    Energy Savers [EERE]

    Simplified Space Conditioning in Low Load Homes Andrew Poerschke IBACOS, Inc. BA Webinar October, 2014 Overview * Define the problem * Define thermal comfort * Discuss solutions * Case Studies - Cold Climate Unoccupied Lab House - Hot Climate Occupied Test House Smaller Loads, same size home 7 Tons 2800 CFM 3663 sq ft 3 Tons 1200 CFM 3663 sq ft Benchmark ZERH Here is the problem - Though loads are smaller, same floor plan and geometry makes it difficult to condition space with less CFM. -

  16. Active Load Control Techniques for Wind Turbines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Active Load Control Techniques for Wind Turbines Scott J. Johnson and C. P. "Case" van Dam Department of Mechanical and Aeronautical Engineering University of California One ...

  17. History of Load Participation in ERCOT

    SciTech Connect (OSTI)

    Patterson, Mark

    2011-10-25

    Presentation on demand integration by ERCOT for a DOE Workshop. Covers history of load participation in ERCOT from 2002 to present.

  18. Load Participation in Ancillary Services Workshop Report

    SciTech Connect (OSTI)

    Kirby, Brendan; O'Malley, Mark; Ma, Ookie; Cappers, Peter; Corbus, Dave; Kiliccote, Sila; Onar, Omer; Starke, Michael; Steinberg, Dan

    2011-10-25

    Developing load participation in ancillary services to the electric grid. Challenges: coordination among multiple entities, targeted R&D for market conditions and regulatory and policy environments.

  19. Combi Systems for Low Load homes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Context Technical Approach * A condensing water heater and hydronic air handler will used to provide space and water heating loads in almost 300 weatherized homes. * System ...

  20. Minimum Day Time Load Calculation and Screening

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Islanding Risk", inverters may fail to detect the island within 2 seconds, if total generation exceeds 67% of the load and reactive power match falls within 1% ...

  1. Building Technologies Office Load Control Strategies

    Broader source: Energy.gov [DOE]

    BTO researches and implements load control strategies, which support the Sustainable and Holistic IntegratioN of Energy storage and Solar PV (SHINES) FOA.

  2. Chapter 13 - Simplified Acquisition Procedures | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 - Simplified Acquisition Procedures Chapter 13 - Simplified Acquisition Procedures 13.1 - Purchase Card Policy and Operating Procedures PDF icon 13.2PurchaseOrders0.pdf PDF...

  3. Federal Agency NEPA Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Agency NEPA Procedures Federal Agency NEPA Procedures Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ Regulations while also reflecting each agency's unique mandate and mission. As a result, NEPA procedures vary from agency to agency. Further procedural differences may derive from other statutory requirements, agency-specific regulations

  4. Software Verification and Validation Procedure

    SciTech Connect (OSTI)

    Olund, Thomas S.

    2008-09-15

    This Software Verification and Validation procedure provides the action steps for the Tank Waste Information Network System (TWINS) testing process. The primary objective of the testing process is to provide assurance that the software functions as intended, and meets the requirements specified by the client. Verification and validation establish the primary basis for TWINS software product acceptance.

  5. Hazardous Materials Incident Response Procedure

    Broader source: Energy.gov [DOE]

    The purpose of this procedure is to provide guidance for developing an emergency response plan, as outlined in OSHA’s 29 CFR 1910.120(q), for facility response.  This model has been adopted and...

  6. Cooperating Agencies in Implementing the Procedural Requirements...

    Energy Savers [EERE]

    Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Cooperating Agencies in Implementing the Procedural Requirements of the National...

  7. Procedures and Instructions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedure for Conducting a Records Inventory (PDF) Procedure for Preparing a Records Inventory and Disposition Schedule (RIDS) (PDF) InstructionsBrochures Managing Social Media ...

  8. Public Comment Procedures | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Public Comment Procedures Public Comment Procedures In response to an application, any person may file a protest, comments, or a motion to intervene or notice of intervention, as...

  9. Export Authorizations - Procedures | Department of Energy

    Energy Savers [EERE]

    Export Authorizations - Procedures Export Authorizations - Procedures Part II, Section 202(e) of the Federal Power Act (FPA) states that exports of electric energy should be...

  10. Specifications and Test Procedures | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Specifications and Test Procedures Grid interoperability requires a complex set of interactions defined by specifications and proven through standardized test procedures. Grid...

  11. External Independent Review (EIR) Standard Operating Procedure...

    Office of Environmental Management (EM)

    (EIR) Standard Operating Procedure (SOP) September 2010 External Independent Review (EIR) Standard Operating Procedure (SOP) Septemebr 2010 Contractor Statement of Work (SOW)...

  12. 1997 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1997-12-01

    The 1997 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. Data detailing Pacific Northwest non-utility generating (NUG) resources is also available upon request. This analysis updates the 1996 pacific Northwest Loads and Resources Study, published in December 1996. In this loads and resources study, resource availability is compared with a medium forecast of electricity consumption. This document analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system which includes loads and resources in addition to the Federal system. This study presents the Federal system and regional analyses for the medium load forecast. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1998--99 through 2007--08.

  13. Apparatus for loading a band saw blade

    DOE Patents [OSTI]

    Reeves, Steven R. (49 Williams Ave., West Valley, NY 14171)

    1990-01-01

    A band saw blade is loaded between pairs of guide wheels upon tensioning the blade by guiding the blade between pairs of spaced guide plates which define converging slots that converge toward the guide wheels. The approach is particularly useful in loading blades on underwater band saw machines used to cut radioactive materials.

  14. Apparatus for loading a band saw blade

    DOE Patents [OSTI]

    Reeves, S.R.

    1990-03-20

    A band saw blade is loaded between pairs of guide wheels upon tensioning the blade by guiding the blade between pairs of spaced guide plates which define converging slots that converge toward the guide wheels. The approach is particularly useful in loading blades on underwater band saw machines used to cut radioactive materials. 2 figs.

  15. Strategies for Controlling Plug Loads. A Tool for Reducing Plug Loads in Commercial Buildings

    SciTech Connect (OSTI)

    Torcellini, Paul; Bonnema, Eric; Sheppy, Michael; Pless, Shanti

    2015-09-01

    Plug loads are often not considered as part of the energy savings measures in Commercial Buildings; however, they can account for up to 50% of the energy used in the building. These loads are numerous and often scattered throughout a building. Some of these loads are purchased by the owner and some designed into the building or the tenant finishes for a space. This document provides a strategy and a tool for minimizing these loads.

  16. Using Utility Load Data to Estimate Demand for Space Cooling and Potential for Shiftable Loads

    SciTech Connect (OSTI)

    Denholm, P.; Ong, S.; Booten, C.

    2012-05-01

    This paper describes a simple method to estimate hourly cooling demand from historical utility load data. It compares total hourly demand to demand on cool days and compares these estimates of total cooling demand to previous regional and national estimates. Load profiles generated from this method may be used to estimate the potential for aggregated demand response or load shifting via cold storage.

  17. An Evaluation of the HVAC Load Potential for Providing Load Balancing Service

    SciTech Connect (OSTI)

    Lu, Ning

    2012-09-30

    This paper investigates the potential of providing aggregated intra-hour load balancing services using heating, ventilating, and air-conditioning (HVAC) systems. A direct-load control algorithm is presented. A temperature-priority-list method is used to dispatch the HVAC loads optimally to maintain consumer-desired indoor temperatures and load diversity. Realistic intra-hour load balancing signals were used to evaluate the operational characteristics of the HVAC load under different outdoor temperature profiles and different indoor temperature settings. The number of HVAC units needed is also investigated. Modeling results suggest that the number of HVACs needed to provide a {+-}1-MW load balancing service 24 hours a day varies significantly with baseline settings, high and low temperature settings, and the outdoor temperatures. The results demonstrate that the intra-hour load balancing service provided by HVAC loads meet the performance requirements and can become a major source of revenue for load-serving entities where the smart grid infrastructure enables direct load control over the HAVC loads.

  18. Non destructive neutron diffraction measurements of cavities, inhomogeneities, and residual strain in bronzes of Ghiberti's relief from the Gates of Paradise

    SciTech Connect (OSTI)

    Festa, G.; Senesi, R.; Alessandroni, M.; Andreani, C.; Vitali, G.; Porcinai, S.; Giusti, A. M.; Materna, T.; Paradowska, A. M.

    2011-03-15

    Quantitative neutron studies of cultural heritage objects provide access to microscopic, mesoscopic, and macroscopic structures in a nondestructive manner. In this paper we present a neutron diffraction investigation of a Ghiberti Renaissance gilded bronze relief devoted to the measurement of cavities and inhomogeneities in the bulk of the sample, along with the bulk phase composition and residual strain distribution. The quantitative measurements allowed the determination of the re-melting parts extension, as well as improving current knowledge about the manufacturing process. The study provides significant and unique information to conservators and restorators about the history of the relief.

  19. ESTIMATED SIL LEVELS AND RISK COMPARISONS FOR RELIEF VALVES AS A FUNCTION OF TIME-IN-SERVICE

    SciTech Connect (OSTI)

    Harris, S.

    2012-03-26

    Risk-based inspection methods enable estimation of the probability of spring-operated relief valves failing on demand at the United States Department of Energy's Savannah River Site (SRS) in Aiken, South Carolina. The paper illustrates an approach based on application of the Frechet and Weibull distributions to SRS and Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD) proof test results. The methodology enables the estimation of ANSI/ISA-84.00.01 Safety Integrity Levels (SILs) as well as the potential change in SIL level due to modification of the maintenance schedule. Current SRS practices are reviewed and recommendations are made for extending inspection intervals. The paper compares risk-based inspection with specific SILs as maintenance intervals are adjusted. Groups of valves are identified in which maintenance times can be extended as well as different groups in which an increased safety margin may be needed.

  20. Variability of Load and Net Load in Case of Large Scale Distributed Wind Power

    SciTech Connect (OSTI)

    Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Gomez-Lazaro, E.; Rawn, B.; Dobschinski, J.; Meibom, P.; Lannoye, E.; Aigner, T.; Wan, Y. H.; Milligan, M.

    2011-01-01

    Large scale wind power production and its variability is one of the major inputs to wind integration studies. This paper analyses measured data from large scale wind power production. Comparisons of variability are made across several variables: time scale (10-60 minute ramp rates), number of wind farms, and simulated vs. modeled data. Ramp rates for Wind power production, Load (total system load) and Net load (load minus wind power production) demonstrate how wind power increases the net load variability. Wind power will also change the timing of daily ramps.

  1. Current Test Procedure Waivers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Current Test Procedure Waivers Current Test Procedure Waivers The U.S. Department of Energy's (DOE) regulations for covered products permit a person to seek a waiver, or an interim waiver, from the test procedure requirements for covered appliances and commercial equipment if certain criteria are satisfied. Regulations applicable to test procedure waivers for appliances can be found at 10 CFR 430.27; those applicable to test procedure waivers for commercial equipment are at 10 CFR 431.401. This

  2. Forrestal Garage Parking Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Forrestal Garage Parking Procedures Forrestal Garage Parking Procedures Forrestal Garage Parking Procedures - The Forrestal Facility Parking Guide was created to define policies and procedures governing the assignment, use, and management of parking spaces controlled by the Department of Energy (DOE) in the Forrestal facility in Washington, DC. This guide applies to DOE Federal employees, including National Nuclear Security Administration (NNSA) Federal employees. These procedures were last

  3. Procedures and Instructions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management » Procedures and Instructions Procedures and Instructions keyboard-886462_960_720.jpg Records Management Processes Procedure for Conducting a Records Inventory (PDF) Procedure for Preparing a Records Inventory and Disposition Schedule (RIDS) (PDF) Instructions/Brochures Managing Social Media Records (PDF) Procedures for Departing Employees (PDF) Reminder for Senior Officials (PDF) Your Records Responsibility Pamphlet (PDF) Vital Records Pamphlet (PDF) Records Management Assessment

  4. Synthesis of polyoxometalate-loaded epoxy composites

    DOE Patents [OSTI]

    Anderson, Benjamin J

    2014-10-07

    The synthesis of a polyoxometalate-loaded epoxy uses a one-step cure by applying an external stimulus to release the acid from the polyoxometalate and thereby catalyze the cure reaction of the epoxy resin. Such polyoxometalate-loaded epoxy composites afford the cured epoxy unique properties imparted by the intrinsic properties of the polyoxometalate. For example, polyoxometalate-loaded epoxy composites can be used as corrosion resistant epoxy coatings, for encapsulation of electronics with improved dielectric properties, and for structural applications with improved mechanical properties.

  5. 1999 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1999-12-01

    The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to its regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. The White Book will not be used in calculations for the 2002 regional power sales contract subscription process. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions, including expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. In this loads and resources study, resource availability is compared with a medium forecast of electricity consumption. The forecasted future electricity demands--firm loads--are subtracted from the projected capability of existing and ''contracted for'' resources to determine whether BPA and the region will be surplus or deficit. If Federal system resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA may use or market to increase revenues. Conversely, if Federal system firm loads exceed available resources, there is a deficit of energy and/or capacity and BPA would add conservation or contract purchases as needed to meet its firm loads. The load forecast is derived by using econometric models and analysis to predict the loads that will be placed on electric utilities in the region. This study incorporates information on contract obligations and contract resources, combined with the resource capabilities obtained from public utility and investor-owned utility (IOU) customers through their annual data submittals to the PNUCC, from BPA's Firm Resource Exhibit (FRE Exhibit I) submittals, and through analysis of the Federal hydroelectric power system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. The PNCA defines the planning and operation of the regional hydrosystem. The 1999 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix (available electronically only) detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the December 1998 Pacific Northwest Loads and Resources Study. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 2000-01 through 2009-10. The study shows the Federal system's and the region's monthly estimated maximum electricity demand, monthly energy demand, monthly energy generation, and monthly maximum generating capability--capacity--for OY 2000-01, 2004-05, and 2009-10. The Federal system and regional monthly capacity surplus/deficit projections are summarized for 10 operating years. This document analyzes the Pacific Northwest's projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resources in addition to the Federal system.

  6. Web Login Service - Loading Session State...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Login Service - Loading Session State... Since your browser does not support JavaScript, you must press the Continue button once to proceed. Continue Insert your footer text here....

  7. High density load bearing insulation peg

    DOE Patents [OSTI]

    Nowobilski, Jeffert J. (Orchard Park, NY); Owens, William J. (Kenmore, NY)

    1985-01-01

    A high density peg which can support a large load and exhibits excellent thermal resistance produced by a method wherein the peg is made in compliance with specified conditions of time, temperature and pressure.

  8. Passive load control for large wind turbines.

    SciTech Connect (OSTI)

    Ashwill, Thomas D.

    2010-05-01

    Wind energy research activities at Sandia National Laboratories focus on developing large rotors that are lighter and more cost-effective than those designed with current technologies. Because gravity scales as the cube of the blade length, gravity loads become a constraining design factor for very large blades. Efforts to passively reduce turbulent loading has shown significant potential to reduce blade weight and capture more energy. Research in passive load reduction for wind turbines began at Sandia in the late 1990's and has moved from analytical studies to blade applications. This paper discusses the test results of two Sandia prototype research blades that incorporate load reduction techniques. The TX-100 is a 9-m long blade that induces bend-twist coupling with the use of off-axis carbon in the skin. The STAR blade is a 27-m long blade that induces bend-twist coupling by sweeping the blade in a geometric fashion.

  9. S-Band Loads for SLAC Linac

    SciTech Connect (OSTI)

    Krasnykh, A.; Decker, F.-J.; LeClair, R.; /INTA Technologies, Santa Clara

    2012-08-28

    The S-Band loads on the current SLAC linac RF system were designed, in some cases, 40+ years ago to terminate 2-3 MW peak power into a thin layer of coated Kanthal material as the high power absorber [1]. The technology of the load design was based on a flame-sprayed Kanthal wire method onto a base material. During SLAC linac upgrades, the 24 MW peak klystrons were replaced by 5045 klystrons with 65+ MW peak output power. Additionally, SLED cavities were introduced and as a result, the peak power in the current RF setup has increased up to 240 MW peak. The problem of reliable RF peak power termination and RF load lifetime required a careful study and adequate solution. Results of our studies and three designs of S-Band RF load for the present SLAC RF linac system is discussed. These designs are based on the use of low conductivity materials.

  10. Final Project Report Load Modeling Transmission Research

    SciTech Connect (OSTI)

    Lesieutre, Bernard; Bravo, Richard; Yinger, Robert; Chassin, Dave; Huang, Henry; Lu, Ning; Hiskens, Ian; Venkataramanan, Giri

    2012-03-31

    The research presented in this report primarily focuses on improving power system load models to better represent their impact on system behavior. The previous standard load model fails to capture the delayed voltage recovery events that are observed in the Southwest and elsewhere. These events are attributed to stalled air conditioner units after a fault. To gain a better understanding of their role in these events and to guide modeling efforts, typical air conditioner units were testing in laboratories. Using data obtained from these extensive tests, new load models were developed to match air conditioner behavior. An air conditioner model is incorporated in the new WECC composite load model. These models are used in dynamic studies of the West and can impact power transfer limits for California. Unit-level and systemlevel solutions are proposed as potential solutions to the delayed voltage recovery problem.

  11. Customer Load Eligibility Guidelines (CLEG), April 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3.2. Mixed Residential and Commercial Uses (50% Rule). Load related to commercial enterprises metered through a bona fide residence is eligible for REP benefits as long as the...

  12. Radiation load to the SNAP CCD

    SciTech Connect (OSTI)

    N. V. Mokhov, I. L. Rakhno and S. I. Striganov

    2003-08-14

    Results of an express Monte Carlo analysis with the MARS14 code of radiation load to the CCD optical detectors in the Supernova Acceleration Project (SNAP) mission presented for realistic radiation environment over the satellite orbit.

  13. Load apparatus and method for bolt-loaded compact tension test specimen

    DOE Patents [OSTI]

    Buescher, B.J. Jr.; Lloyd, W.R.; Ward, M.B.; Epstein, J.S.

    1997-02-04

    A bolt-loaded compact tension test specimen load apparatus includes: (a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; (b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; (c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and (d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen. 6 figs.

  14. Load apparatus and method for bolt-loaded compact tension test specimen

    DOE Patents [OSTI]

    Buescher, Jr., Brent J.; Lloyd, W. Randolph; Ward, Michael B.; Epstein, Jonathan S.

    1997-01-01

    A bolt-loaded compact tension test specimen load apparatus includes: a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen.

  15. Laser Driven Dynamic Loading of Condensed Matter

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laser Driven Dynamic Loading of Condensed Matter Laser Driven Dynamic Loading of Condensed Matter Advanced diagnostics of experiments covering many orders of magnitude in strain rate Contact Eric Loomis (505) 665-3196 Email Dynamic materials experiments over a wide range of strain rates are essential to studying constitutive relations (e.g., plasticity), damage (e.g., spall), equations of state, phase transitions and kinetics, and novel materials. The Trident laser facility supplies unique,

  16. Bioenergy Impacts … Self-Loading Trailer

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FDC Enterprises, which partnered with Kelderman Manufacturing to develop a self- loading trailer. Biofuels company Abengoa purchased the self-loading trailer to streamline the movement of corn plant residues to its biorefinery, where they are converted into biofuel. Biorefineries are cutting their costs by using more efficient harvesting equipment BIOENERGY To learn more, visit bioenergy.energy.gov. BIOENERGY TECHNOLOGIES OFFICE Photo courtesy of Dave Jordan, MacDon Industries Ltd.

  17. Ex-ante modeling, Load Scheduling and Differentiated Service Models for Populations of Flexible Loads

    Office of Environmental Management (EM)

    Ex-ante modeling, Load Scheduling and Differentiated Service Models for Populations of Flexible Loads Anna Scaglione (UC Davis) GSR: Mahnoosh Alizadeh CERTS Review Meeting 2014 1 / 42 Main objectives of the project Objectives: Modeling control mechanisms and economic value for aggregated load flexibility Evaluation: Theory and validation by simulations 2 / 42 Residential/personal appliances potential Observation: Costs include that of recruiting customers The "Internet of things" will

  18. 2006 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-03-01

    The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The load resource balance of both the Federal system and the region is determined by comparing resource availability to an expected level of total retail electricity consumption. Resources include projected energy capability plus contract purchases. Loads include a forecast of retail obligations plus contract obligations. Surplus energy is available when resources are greater than loads. This surplus energy could be marketed to increase revenues. Energy deficits occur when resources are less than loads. These energy deficits will be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of loads due to economic conditions or closures, additional contract purchases, and/or the addition of new generating resources. This study incorporates information on Pacific Northwest (PNW) regional retail loads, contract obligations, and contract resources. This loads and resources analysis simulates the operation of the power system in the PNW. The simulated hydro operation incorporates plant characteristics, streamflows, and non-power requirements from the current Pacific Northwest Coordination Agreement (PNCA). Additional resource capability estimates were provided by BPA, PNW Federal agency, public agency, cooperative, U.S. Bureau of Reclamation (USBR), and investor-owned utility (IOU) customers furnished through annual PNUCC data submittals for 2005 and/or direct submittals to BPA. The 2006 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information for marketer contracts is not detailed due to confidentiality agreements. The 2006 White Book analysis updates the 2004 White Book. This analysis shows projections of the Federal system and region's yearly average annual energy consumption and resource availability for the study period, OY 2007-2016. The study also presents projections of Federal system and region expected 1-hour monthly peak demand, monthly energy demand, monthly 1-hour peak generating capability, and monthly energy generation for OY 2007, 2011, and 2016. BPA is investigating a new approach in capacity planning depicting the monthly Federal system 120-hour peak generating capability and 120-hour peak surplus/deficit for OY 2007, 2011, and 2016. This document analyzes the PNW's projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger PNW regional power system loads and resources that include the Federal system as well other PNW entities.

  19. Chapter 13 - Simplified Acquisition Procedures | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    13.1 - Purchase Card Policy and Operating Procedures 13.2PurchaseOrders0.pdf Acq. Guide 13.3 Simplified Acqusition Procedures.pdf More Documents & Publications POLICY FLASH...

  20. Practice and Procedure Guide | Open Energy Information

    Open Energy Info (EERE)

    Practice and Procedure Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Practice and Procedure GuideLegal Abstract Public...

  1. Load cell having strain gauges of arbitrary location

    DOE Patents [OSTI]

    Spletzer, Barry (Albuquerque, NM)

    2007-03-13

    A load cell utilizes a plurality of strain gauges mounted upon the load cell body such that there are six independent load-strain relations. Load is determined by applying the inverse of a load-strain sensitivity matrix to a measured strain vector. The sensitivity matrix is determined by performing a multivariate regression technique on a set of known loads correlated to the resulting strains. Temperature compensation is achieved by configuring the strain gauges as co-located orthogonal pairs.

  2. Quality Procedure - Document Review | Department of Energy

    Energy Savers [EERE]

    Review Quality Procedure - Document Review This procedure establishes the process for the reivew and approval of Environmental Managemnt (EM) Quality Assurance (QA) program documents as performed by the Office of Standards and Quality Assurance. This procedure also establishes the process for review and approval of other EM documents external to the EM Headquarters Office of Standards and Quality Assurance. PDF icon Quality Procedure - Document Review More Documents & Publications Quality

  3. Quality Procedure - Stop Work | Department of Energy

    Energy Savers [EERE]

    Stop Work Quality Procedure - Stop Work This Quality Procedure establishes the Office of Standards and Quality Assurance authority, responsibilities, and instructions to direct that unsafe work be stopped, during the execution and operations of its activities, specifically in oversight activities. this procedure is utilized and accomplished upon coordination with management of the Environmental Management (EM) Headquarters and Field Office. This procedure also provides provisions for the restart

  4. TMACS Test Procedure TP007: System administration

    SciTech Connect (OSTI)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-05-24

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions.

  5. TMACS Test Procedure TP001: Alarm Management

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Alarm management functions.

  6. TMACS Test Procedure TP002: Trending

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  7. TMACS Test Procedure TP009: Acromag Driver

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code).

  8. TMACS Test Procedure TP002: Trending

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-08-29

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  9. Generic disposal concepts and thermal load management for larger...

    Office of Scientific and Technical Information (OSTI)

    Generic disposal concepts and thermal load management for larger waste packages. Citation Details In-Document Search Title: Generic disposal concepts and thermal load management...

  10. Bacman LowLoad GEPP | Open Energy Information

    Open Energy Info (EERE)

    Home Bacman LowLoad GEPP General Information Name Bacman LowLoad GEPP Facility Power Plant Sector Geothermal energy Location Information Coordinates 11.152427744569,...

  11. Minimized Space Conditioning Distribution Strategy for Low-load...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Minimized Space Conditioning Distribution Strategy for Low-load Homes Minimized Space Conditioning Distribution Strategy for Low-load Homes This presentation was given at the...

  12. Characterization of Dynamic Loads on Solar Modules with Respect...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Characterization of Dynamic Loads on Solar Modules with Respect to Fracture of Solar Cells Characterization of Dynamic Loads on Solar Modules with Respect to Fracture of Solar ...

  13. Beam Loading by Distributed Injection of Electrons in a Plasma...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Beam Loading by Distributed Injection of Electrons in a Plasma Wakefield Accelerator Citation Details In-Document Search Title: Beam Loading by Distributed...

  14. Loads Providing Ancillary Services: Review of International Experience...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Loads Providing Ancillary Services: Review of International Experience Loads Providing Ancillary Services: Review of International Experience In this study, we examine the ...

  15. Development of an Accelerated Ash-Loading Protocol for Diesel...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an Accelerated Ash-Loading Protocol for Diesel Particulate Filters Development of an Accelerated Ash-Loading Protocol for Diesel Particulate Filters Poster presentation at the 2007...

  16. Water Energy Load Profiling (WELP) Tool | Open Energy Information

    Open Energy Info (EERE)

    Load Profiling (WELP) Tool Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Water Energy Load Profiling (WELP) Tool AgencyCompany Organization: California Public...

  17. Y-12 Finishes Initial HEUMF Loading Ahead of Schedule | National...

    National Nuclear Security Administration (NNSA)

    Blog Home Field Offices Welcome to the NNSA Production Office NPO News Releases Y-12 Finishes Initial HEUMF Loading Ahead of Schedule Y-12 Finishes Initial HEUMF Loading...

  18. Effect of Compression Ratio and Piston Geometry on RCCI load...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compression Ratio and Piston Geometry on RCCI load limit Effect of Compression Ratio and Piston Geometry on RCCI load limit Explores the effect of compression ratio and piston ...

  19. Local Soot Loading Distribution in Cordierite Diesel Particulate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Local Soot Loading Distribution in Cordierite Diesel Particulate Filters by Dynamic Neutron Radiography Local Soot Loading Distribution in Cordierite Diesel Particulate Filters by...

  20. Strategy Guideline: Accurate Heating and Cooling Load Calculations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the first step of HVAC system design. Accurate load calculations have a direct impact on energy efficiency, occupant comfort, indoor air quality, and building durability. The load...

  1. Comparison of Different Load Road Implementation Strategies on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Different Load Road Implementation Strategies on Fuel Economy of USPS Step Vans Comparison of Different Load Road Implementation Strategies on Fuel Economy of USPS Step Vans An ...

  2. Technical Assistance to ISO's and Grid Operators For Loads Providing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability Technical Assistance to ISO's and Grid Operators For Loads ...

  3. Load controller and method to enhance effective capacity of a photovoltaic power supply using a dynamically determined expected peak loading

    DOE Patents [OSTI]

    Perez, Richard

    2005-05-03

    A load controller and method are provided for maximizing effective capacity of a non-controllable, renewable power supply coupled to a variable electrical load also coupled to a conventional power grid. Effective capacity is enhanced by monitoring power output of the renewable supply and loading, and comparing the loading against the power output and a load adjustment threshold determined from an expected peak loading. A value for a load adjustment parameter is calculated by subtracting the renewable supply output and the load adjustment parameter from the current load. This value is then employed to control the variable load in an amount proportional to the value of the load control parameter when the parameter is within a predefined range. By so controlling the load, the effective capacity of the non-controllable, renewable power supply is increased without any attempt at operational feedback control of the renewable supply.

  4. Low-Load Space Conditioning Needs Assessment

    SciTech Connect (OSTI)

    Puttagunta, Srikanth

    2015-05-01

    With limited low-load options in the HVAC market, many new-construction housing units are being fitted with oversized equipment - thus facing penalties in system efficiency, comfort, and cost. To bridge the gap between currently available HVAC equipment and the rising demand for low-load HVAC equipment in the marketplace, HVAC equipment manufacturers need to be fully aware of multifamily buildings and single-family homes market needs. Over the past decade, Steven Winter Associates, Inc. (SWA) has provided certification and consulting services on hundreds of housing projects and has accrued a large pool of data. CARB compiled and analyzed these data to see what the thermal load ranges are in various multifamily apartments and attached single-family home types (duplex and townhouse). In total, design loads from 941 dwellings from SWA's recent multifamily and attached single-family work across the Northeast and Mid-Atlantic were analyzed. Information on the dwelling characteristics, design loads, and the specifications of installed mechanical equipment were analyzed to determine any trends that exist within the dataset.

  5. A comparison of measured wind park load histories with the WISPER and WISPERX load spectra

    SciTech Connect (OSTI)

    Kelley, N.D.

    1995-01-01

    The blade-loading histories from two adjacent Micon 65/13 wind turbines are compared with the variable-amplitude test-loading histories known as the WISPER and WISPERX spectra. These standardized loading sequences were developed from blade flapwise load histories taken from nine different horizontal-axis wind turbines operating under a wide range of conditions in Europe. The subject turbines covered a broad spectrum of rotor diameters, materials, and operating environments. The final loading sequences were developed as a joint effort of thirteen different European organizations. The goal was to develop a meaningful loading standard for horizontal-axis wind turbine blades that represents common interaction effects seen in service. In 1990, NREL made extensive load measurements on two adjacent Micon 65/13 wind turbines in simultaneous operation in the very turbulent environment of a large wind park. Further, before and during the collection of the loads data, comprehensive measurements of the statistics of the turbulent environment were obtained at both the turbines under test and at two other locations within the park. The trend to larger but lighter wind turbine structures has made an understanding of the expected lifetime loading history of paramount importance. Experience in the US has shown that the turbulence-induced loads associated with multi-row wind parks in general are much more severe than for turbines operating individually or within widely spaced environments. Multi-row wind parks are much more common in the US than in Europe. In this paper we report on our results in applying the methodology utilized to develop the WISPER and WISPERX standardized loading sequences using the available data from the Micon turbines. While the intended purpose of the WISPER sequences were not to represent a specific operating environment, we believe the exercise is useful, especially when a turbine design is likely to be installed in a multi-row wind park.

  6. Review of Test Procedure for Determining HSPFs of Residential Variable-Speed Heat Pumps

    SciTech Connect (OSTI)

    Rice, C. Keith; Munk, Jeffrey D.; Shrestha, Som S.

    2015-08-01

    This report reviews the suitability of the existing Heating Seasonal Performance Factor (HSPF) ratings and testing requirements for the current generation of variable-speed (VS) air-source heat pumps. Recent field test results indicate larger discrepancies between rated HSPF and field-observed HSPF for VS models than for single-speed models in the same houses. These findings suggest that the heating season test and ratings procedure should be revisited for VS heat pumps. The ratings and testing procedures are described in ANSI/AHRI 210/240 (2008) for single-speed, two-capacity, and variable-speed units. Analysis of manufacturer and independent test performance data on VS units reveals why the current VS testing/ratings procedure results in overly optimistic HSPF ratings for some VS units relative to other types of heat pumps. This is due to a combination of extrapolation of low speed test data beyond the originally anticipated ambient temperature operating range and the constraints of unit controls, which prevent low speed operation over the range of ambient temperatures assumed in the procedure for low speed. As a result, the HSPFs of such units are being overpredicted relative to those for single- and two-capacity designs. This overprediction has been found to be significantly reduced by use in the HSPF ratings procedure of an alternative higher-load heating load line, described in a companion report (Rice et al., 2015).

  7. Finite element modeling of concentrating solar collectors for evauation of gravity loads, bending, and optical characterization.

    SciTech Connect (OSTI)

    Christian, Joshua M.; Ho, Clifford Kuofei

    2010-04-01

    Understanding the effects of gravity and wind loads on concentrating solar power (CSP) collectors is critical for performance calculations and developing more accurate alignment procedures and techniques. This paper presents a rigorous finite-element model of a parabolic trough collector that is used to determine the impact of gravity loads on bending and displacements of the mirror facets and support structure. The geometry of the LUZ LS-2 parabolic trough collector was modeled using SolidWorks, and gravity-induced loading and displacements were simulated in SolidWorks Simulation. The model of the trough collector was evaluated in two positions: the 90{sup o} position (mirrors facing upward) and the 0{sup o} position (mirrors facing horizontally). The slope errors of the mirror facet reflective surfaces were found by evaluating simulated angular displacements of node-connected segments along the mirror surface. The ideal (undeformed) shape of the mirror was compared to the shape of the deformed mirror after gravity loading. Also, slope errors were obtained by comparing the deformed shapes between the 90{sup o} and 0{sup o} positions. The slope errors resulting from comparison between the deformed vs. undeformed shape were as high as {approx}2 mrad, depending on the location of the mirror facet on the collector. The slope errors resulting from a change in orientation of the trough from the 90{sup o} position to the 0{sup o} position with gravity loading were as high as {approx}3 mrad, depending on the location of the facet.

  8. Load attenuating passively adaptive wind turbine blade

    DOE Patents [OSTI]

    Veers, Paul S.; Lobitz, Donald W.

    2003-01-07

    A method and apparatus for improving wind turbine performance by alleviating loads and controlling the rotor. The invention employs the use of a passively adaptive blade that senses the wind velocity or rotational speed, and accordingly modifies its aerodynamic configuration. The invention exploits the load mitigation prospects of a blade that twists toward feather as it bends. The invention includes passively adaptive wind turbine rotors or blades with currently preferred power control features. The apparatus is a composite fiber horizontal axis wind-turbine blade, in which a substantial majority of fibers in the blade skin are inclined at angles of between 15 and 30 degrees to the axis of the blade, to produces passive adaptive aeroelastic tailoring (bend-twist coupling) to alleviate loading without unduly jeopardizing performance.

  9. Load attenuating passively adaptive wind turbine blade

    DOE Patents [OSTI]

    Veers, Paul S. (Albuquerque, NM); Lobitz, Donald W. (Albuquerque, NM)

    2003-01-01

    A method and apparatus for improving wind turbine performance by alleviating loads and controlling the rotor. The invention employs the use of a passively adaptive blade that senses the wind velocity or rotational speed, and accordingly modifies its aerodynamic configuration. The invention exploits the load mitigation prospects of a blade that twists toward feather as it bends. The invention includes passively adaptive wind turbine rotors or blades with currently preferred power control features. The apparatus is a composite fiber horizontal axis wind-turbine blade, in which a substantial majority of fibers in the blade skin are inclined at angles of between 15 and 30 degrees to the axis of the blade, to produces passive adaptive aeroelastic tailoring (bend-twist coupling) to alleviate loading without unduly jeopardizing performance.

  10. HUMAN RELIABILITY ANALYSIS FOR COMPUTERIZED PROCEDURES

    SciTech Connect (OSTI)

    Ronald L. Boring; David I. Gertman; Katya Le Blanc

    2011-09-01

    This paper provides a characterization of human reliability analysis (HRA) issues for computerized procedures in nuclear power plant control rooms. It is beyond the scope of this paper to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper provides a review of HRA as applied to traditional paper-based procedures, followed by a discussion of what specific factors should additionally be considered in HRAs for computerized procedures. Performance shaping factors and failure modes unique to computerized procedures are highlighted. Since there is no definitive guide to HRA for paper-based procedures, this paper also serves to clarify the existing guidance on paper-based procedures before delving into the unique aspects of computerized procedures.

  11. Intelligent electrical outlet for collective load control

    DOE Patents [OSTI]

    Lentine, Anthony L.; Ford, Justin R.; Spires, Shannon V.; Goldsmith, Steven Y.

    2015-10-27

    Various technologies described herein pertain to an electrical outlet that autonomously manages loads in a microgrid. The electrical outlet can provide autonomous load control in response to variations in electrical power generation supply in the microgrid. The electrical outlet includes a receptacle, a sensor operably coupled to the receptacle, and an actuator configured to selectively actuate the receptacle. The sensor measures electrical parameters at the receptacle. Further, a processor autonomously controls the actuator based at least in part on the electrical parameters measured at the receptacle, electrical parameters from one or more disparate electrical outlets in the microgrid, and a supply of generated electric power in the microgrid at a given time.

  12. Intelligent electrical outlet for collective load control

    DOE Patents [OSTI]

    Lentine, Anthony L; Ford, Justin R; Spires, Shannon V; Goldsmith, Steven Y

    2015-11-05

    Various technologies described herein pertain to an electrical outlet that autonomously manages loads in a microgrid. The electrical outlet can provide autonomous load control in response to variations in electrical power generation supply in the microgrid. The electrical outlet includes a receptacle, a sensor operably coupled to the receptacle, and an actuator configured to selectively actuate the receptacle. The sensor measures electrical parameters at the receptacle. Further, a processor autonomously controls the actuator based at least in part on the electrical parameters measured at the receptacle, electrical parameters from one or more disparate electrical outlets in the microgrid, and a supply of generated electric power in the microgrid at a given time.

  13. Demand-Side Response from Industrial Loads

    SciTech Connect (OSTI)

    Starke, Michael R; Alkadi, Nasr E; Letto, Daryl; Johnson, Brandon; Dowling, Kevin; George, Raoule; Khan, Saqib

    2013-01-01

    Through a research study funded by the Department of Energy, Smart Grid solutions company ENBALA Power Networks along with the Oak Ridge National Laboratory (ORNL) have geospatially quantified the potential flexibility within industrial loads to leverage their inherent process storage to help support the management of the electricity grid. The study found that there is an excess of 12 GW of demand-side load flexibility available in a select list of top industrial facilities in the United States. Future studies will expand on this quantity of flexibility as more in-depth analysis of different industries is conducted and demonstrations are completed.

  14. New method developed for LPG offshore loading

    SciTech Connect (OSTI)

    Not Available

    1985-10-01

    An innovative concept for refrigerated LPG offshore loading has been developed by TOTAL and Enterprise D'Equipments Mecaniques at Hydrauliques. Known as CHAGAL, the system integrates with the catenary anchor leg mooring offshore loading system commonly used for crude oil. CHAGAL provides a suitable answer to short-term development schemes of LPG trade. It can be adapted for possible extrapolation to cryogenic temperatures of LNG and it opens a new way to the development of offshore liquefaction projects for which the offloading of production is still an unsolved key problem.

  15. INVESTING IN NEW BASE LOAD GENERATING CAPACITY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    INVESTING IN NEW BASE LOAD GENERATING CAPACITY Paul L. Joskow April 8, 2008 The views expressed here are my own. They do not reflect the views of the Alfred P. Sloan Foundation, MIT or any other organization with which I am affiliated. THE 25-YEAR VIEW * Significant investment in base-load generating capacity is required over the next 25 years to balance supply and demand efficiently - ~ 200 to 250 Gw (Gross) - Depends on retirements of older steam and peaking units - Depends on demand growth *

  16. net_energy_load_2006.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Region, 2006 and Projected 2007 through 2011 (Thousands of Megawatthours and 2006 Base Year) Net Energy For Load (Annual) Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Projected Year Base Year FRCC MRO (U.S.) NPCC (U.S.) RFC SERC SPP ERCOT WECC (U.S.) 2006 3,911,914 230,115 222,748 294,319 926,279 1,011,173 201,521 305,672 720,087 Projected Contiguous U.S. FRCC MRO (U.S.) NPCC

  17. Surface runoff from full-scale coal combustion product pavements during accelerated loading

    SciTech Connect (OSTI)

    Cheng, C.M.; Taerakul, P.; Tu, W.; Zand, B.; Butalia, T.; Wolfe, W.; Walker, H.

    2008-08-15

    In this study, the release of metals and metalloids from full-scale portland cement concrete pavements containing coal combustion products (CCPs) was evaluated by laboratory leaching tests and accelerated loading of full-scale pavement sections under well-controlled conditions. An equivalent of 20 years of highway traffic loading was simulated at the OSU/OU Accelerated Pavement Load Facility (APLF). Three types of portland cement concrete driving surface layers were tested, including a control section (i.e., ordinary portland cement (PC) concrete) containing no fly ash and two sections in which fly ash was substituted for a fraction of the cement; i.e., 30% fly ash (FA30) and 50% fly ash (FA50). In general, the concentrations of minor and trace elements were higher in the toxicity characteristic leaching procedure (TCLP) leachates than in the leachates obtained from synthetic precipitation leaching procedure and ASTM leaching procedures. Importantly, none of the leachate concentrations exceeded the TCLP limits or primary drinking water standards. Surface runoff monitoring results showed the highest release rates of inorganic elements from the FA50 concrete pavement, whereas there were little differences in release rates between PC and FA30 concretes. The release of elements generally decreased with increasing pavement loading. Except for Cr, elements were released as particulates (>0.45 {mu} m) rather than dissolved constituents. The incorporation of fly ash in the PC cement concrete pavements examined in this study resulted in little or no deleterious environmental impact from the leaching of inorganic elements over the lifetime of the pavement system.

  18. Strain rate and inertial effects on impact loaded single-edge notch bend specimens

    SciTech Connect (OSTI)

    Vargas, P.M.; Dodds, R.H. Jr.

    1995-12-31

    Many problems in fracture mechanics of ductile metals involve surface breaking defects located in structures subjected to impact or blast. When the severity of impact loads is sufficient to produce large inelastic deformations, the assessment of crack-tip conditions must include the effects of plasticity, strain rate and inertia. This work examines the interaction of impact loading, inelastic material deformation and rate sensitivity with the goal of improving the interpretation of ductile fracture toughness values measured under dynamic loading. The authors focus on shallow and deeply notched bend test specimens, SE(B)s, employed routinely to measure the static fracture toughness of a material. A thorough understanding of the test specimen`s dynamic behavior is a prerequisite to the application of measured fracture properties in structural applications. Three-dimensional, nonlinear dynamic analyses are performed for SE(B) fracture specimens subjected to impact loading. Loading rates obtained in conventional drop tower tests are applied in the analyses. An explicit time integration procedure coupled with an efficient (one-point) element integration scheme is employed to compute the dynamic response of the specimen. Strain-rate sensitivity is introduced via a new, efficient implementation of the Bodner-Partom viscoplastic constitutive model. Material properties for A533B steel are used in the analyses. Static analyses of the SE(B) specimens provide baseline responses for assessment of inertial effects. Similarly, dynamic analyses using a strain-rate insensitive material provide reference responses for the assessment of strain rate effects. Strains at key locations on the specimens and the support reactions are extracted from the analyses to assess the accuracy of static formulas commonly used to estimate applied J values. Inertial effects on the applied J are quantified by examining the acceleration component of J evaluated through a domain integral procedure.

  19. Load Participation in Ancillary Services Workshop

    Broader source: Energy.gov [DOE]

    The Load Participation in Ancillary Services Workshop was held October 25-26, 2011, in Washington, DC. This U.S. Department of Energy workshop was attended by members of the electric power industry, researchers, and policy makers. The results of the workshop informed the Demand Response and Energy Storage Study.

  20. An unconventional method for load balancing

    SciTech Connect (OSTI)

    Deng, Y.; McCoy, R.A.; Marr, R.B.

    1995-12-01

    A new method of load balancing is introduced based on the idea of dynamically relocating virtual processes corresponding to computations on an abstract system with a larger number of processors. The algorithm introduced preserves the locality of nearest neighbor interactions and has been tested on simulated data and a molecular dynamics code.

  1. An unconventional method for load balancing

    SciTech Connect (OSTI)

    Deng, Y.; McCoy, R.A.; Marr, R.B.; Peierls, R.F.

    1995-08-01

    A new method of load balancing is introduced based on the idea of dynamically relocating virtual processes corresponding to computations on an abstract system with a large number of processors. The algorithm introduced preserves the locality of nearest neighbor interactions and has been tested on simulated data and a molecular dynamics code.

  2. 1995 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-12-01

    The study establishes the planning basis for supplying electricity to customers. The study presents projections of regional and Federal system load and resource capabilities, and serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts.

  3. Low-Load Space Conditioning Needs Assessment

    SciTech Connect (OSTI)

    Puttagunta, Srikanth

    2015-05-19

    Heating, ventilating, and air-conditioning (HVAC) equipment must be right-sized to ensure energy performance and comfort. With limited low-load options in the HVAC market, many new-construction housing units are being fitted with oversized equipment that creates system efficiency, comfort, and cost penalties. To bridge the gap between currently available HVAC equipment that is oversized or inefficient and the rising demand for low-load HVAC equipment in the marketplace, HVAC equipment manufacturers need to be fully aware of the needs of the multifamily building and attached single-family (duplex and townhouse) home market. Over the past decade, Steven Winter Associates, Inc. (SWA) has provided certification and consulting services for hundreds of housing projects and has accrued a large pool of data that describe multifamily and attached single-family home characteristics. The U.S. Department of Energys Building America research team Consortium for Advanced Residential Buildings (CARB) compiled and analyzed these data to outline the characteristics of low-load dwellings such as the heating and cooling design loads.

  4. Spring-loaded polymeric gel actuators

    DOE Patents [OSTI]

    Shahinpoor, M.

    1995-02-14

    Spring-loaded electrically controllable polymeric gel actuators are disclosed. The polymeric gels can be polyvinyl alcohol, polyacrylic acid, or polyacrylamide, and are contained in an electrolytic solvent bath such as water plus acetone. The action of the gel is mechanically biased, allowing the expansive and contractile forces to be optimized for specific applications. 5 figs.

  5. Spring-loaded polymeric gel actuators

    DOE Patents [OSTI]

    Shahinpoor, Mohsen (Albuquerque, NM)

    1995-01-01

    Spring-loaded electrically controllable polymeric gel actuators are disclosed. The polymeric gels can be polyvinyl alcohol, polyacrylic acid, or polyacrylamide, and are contained in an electrolytic solvent bath such as water plus acetone. The action of the gel is mechanically biased, allowing the expansive and contractile forces to be optimized for specific applications.

  6. Valve for fuel pin loading system

    DOE Patents [OSTI]

    Christiansen, David W.

    1985-01-01

    A cyclone valve surrounds a wall opening through which cladding is projected. An axial valve inlet surrounds the cladding. Air is drawn through the inlet by a cyclone stream within the valve. An inflatable seal is included to physically engage a fuel pin subassembly during loading of fuel pellets.

  7. Valve for fuel pin loading system

    DOE Patents [OSTI]

    Christiansen, D.W.

    1984-01-01

    A cyclone valve surrounds a wall opening through which cladding is projected. An axial valve inlet surrounds the cladding. Air is drawn through the inlet by a cyclone stream within the valve. An inflatable seal is included to physically engage a fuel pin subassembly during loading of fuel pellets.

  8. 2003 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2003-12-01

    The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. In this loads and resources study, resource availability is compared to an expected level of total retail electricity consumption. The forecasted annual energy electricity retail load plus contract obligations are subtracted from the sum of the projected annual energy capability of existing resources and contract purchases to determine whether BPA and/or the region will be surplus or deficit. Surplus energy is available when resources are greater than loads. This energy could be marketed to increase revenues. Deficits occur when resources are less than loads. Energy deficits could be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of a load (i.e., due to economic conditions or closures), additional contract purchases, and/or new generating resources. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA). The PNCA defines the planning and operation of seventeen U.S. Pacific Northwest utilities and other parties with generating facilities within the region's hydroelectric (hydro) system. The hydroregulation study used for the 2003 White Book incorporates measures from the National Oceanographic and Atmospheric Administration Fisheries (NOAA Fisheries) Biological Opinion dated December 2000, and the U.S. Fish and Wildlife Service's 2000 Biological Opinion (2000 FCRPS BiOps) for the Snake River and Columbia River projects. These measures include: (1) Increased flow augmentation for juvenile fish migrations in the Snake and Columbia rivers in the spring and summer; (2) Mandatory spill requirements at the Lower Snake and Columbia dams to provide for non-turbine passage routes for juvenile fish migrants; and (3) Additional flows for Kootenai River white sturgeon in the spring. The hydroregulation criteria for this analysis includes: an updated Detailed Operation Plan for Treaty reservoirs for Operating Year (OY) 2004, updated PNCA planning criteria for OY 2003, and revised juvenile fish bypass spill levels for 2000 FCRPS BiOps implementation. The 2003 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information regarding marketer contracts is not detailed due to confidentiality agreements. The 2003 White Book analysis updates the December 2002 White Book. This analysis projects the yearly average energy consumption and resource availability

  9. Test Procedure Waivers | Department of Energy

    Energy Savers [EERE]

    Appliance & Equipment Standards » Rulemakings & Notices » Test Procedure Waivers Test Procedure Waivers Products covered by standards change as manufacturers add new features to their products and update designs in order to compete for consumers. Innovation and product development occasionally causes products to change in ways that either (1) make the results of a test procedure unrepresentative of actual energy use or efficiency, or (2) make it impossible to test in accordance with

  10. Quality Procedure - Records Management | Department of Energy

    Energy Savers [EERE]

    Records Management Quality Procedure - Records Management This procedure establishes the responsibilities and process for identifying and managing records, including quality records, generated by EM Headquarters Office of Standards and Quality Assurance personnel as well as Office of Standards and Quality Assurance representatives located in DOE EM Field Offices in accordance with EM-QA-001, Environmental Management Quality Assurance Program. PDF icon Quality Procedure - Records Management More

  11. Policies and Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Communication & Engagement » EM SSAB » Policies and Procedures Policies and Procedures The purpose of this document is to provide guidance regarding the operation of the Environmental Management Site-Specific Advisory Board (EM SSAB or Board). PDF icon Policies and Procedures More Documents & Publications Memorandum: Regarding Delegation of Designated Federal Officials for Site Specific Advisory Boards DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM GSA Federal Advisory

  12. Standards and Test Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Standards and Test Procedures Standards and Test Procedures The Department of Energy (DOE) establishes energy efficiency standards for certain appliances and equipment, and currently covers more than 50 different products. Authority to undertake this effort was granted by Congress, and DOE follows a four phase process when reviewing existing and developing new standards. Each Product page provides information on recent updates, current standards and test procedures, waivers, exceptions, and

  13. Presidential Permits - Procedures | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    with issuing or denying a Presidential permit. DOE published NEPA implementing procedures on April 24, 1992 (57 FR 15122). These rules, codified at 10 CFR 1021, specifically...

  14. Postdoctoral Extension Procedures | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Extension Procedures The Postdoctoral Office at DEP is responsible for processing the postdoctoral appointment extensions. It is important that all Argonne programmatic divisions...

  15. Generation Interconnection and Deliverability Allocation Procedures...

    Open Energy Info (EERE)

    Interconnection and Deliverability Allocation Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit ApplicationPermit Application:...

  16. Transesterification: Laboratory Analytical Procedure (LAP) Van...

    Office of Scientific and Technical Information (OSTI)

    Wychen, S.; Laurens, L. M. L. 09 BIOMASS FUELS; 59 BASIC BIOLOGICAL SCIENCES BIOMASS; ALGAE; LABORATORY ANALYTICAL PROCEDURES; LAPS; TOTAL LIPIDS; FATTY ACID METHYL ESTERS; FAME;...

  17. Additional Guidance Regarding Application of Current Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance...

  18. NNMCAB Meeting Procedure | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Procedure Guide More Documents & Publications NNMCAB Board Minutes: September 2009 Santa Fe NNMCAB Board Minutes: July 2008 Santa Fe NNMCAB Board Minutes: September 2002...

  19. Hazardous Material Packaging for Transport - Administrative Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1986-09-30

    To establ1sh administrative procedures for the certification and use of radioactive and other hazardous materials packaging by the Department of Energy (DOE).

  20. Memorandum, Interim Procedures During Temporary Suspension of...

    Broader source: Energy.gov (indexed) [DOE]

    hiring, credentialing and eligibility determinations during the period of e-QIP suspension. Memorandum, Interim Procedures During Temporary Suspension of Electronic...

  1. Department of Energy Technical Standards Procedures | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    charged with implementing the Department of Energy (DOE) Technical Standards Program (TSP). September 16, 2013 DOE-TSPP-2-2013, Initiating DOE Technical Standards This procedure...

  2. Load test of the 3701U Building roof deck and support structure

    SciTech Connect (OSTI)

    McCoy, R.M.

    1994-09-14

    The 3701U Building roof area was load tested according to the approved load-test procedure. The 3701U Building is located in the 300 Area of the Hanford Site and has the following characteristics: Roof deck--metal decking supported by steel purlins; Roof membrane--tar and gravel; Roof slope--flat (<10 deg); and Roof elevation--height of about 12.5 ft. The 3701U Building was visited in August 1992 for a visual inspection, but because of insulation an inspection could not be performed. The building was revisited in March 1994 for the purpose of writing this test report. Because the roof could not be inspected, a test was determined to be the best way to qualify the roof for personnel access. The test procedure called for the use of a remotely-controlled robot. The conclusions are that the roof has been qualified for 500-lb total roof load and that the ``No Roof Access`` signs can be changed to ``Roof Access Restricted`` signs.

  3. AVTA: Hybrid Electric Vehicle Specifications and Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Hybrid Electric Vehicle Specifications and Test Procedures PDF icon Fleet Test and Evaluation Procedure PDF icon ...

  4. Significant issues and changes for ANSI/ASME OM-1 1981, part 1, ASME OMc code-1994, and ASME OM Code-1995, Appendix I, inservice testing of pressure relief devices in light water reactor power plants

    SciTech Connect (OSTI)

    Seniuk, P.J.

    1996-12-01

    This paper identifies significant changes to the ANSI/ASME OM-1 1981, Part 1, and ASME Omc Code-1994 and ASME OM Code-1995, Appendix I, {open_quotes}Inservice Testing of Pressure Relief Devices in Light-Water Reactor Power Plants{close_quotes}. The paper describes changes to different Code editions and presents insights into the direction of the code committee and selected topics to be considered by the ASME O&M Working Group on pressure relief devices. These topics include scope issues, thermal relief valve issues, as-found and as-left set-pressure determinations, exclusions from testing, and cold setpoint bench testing. The purpose of this paper is to describe some significant issues being addressed by the O&M Working Group on Pressure Relief Devices (OM-1). The writer is currently the chair of OM-1 and the statements expressed herein represents his personal opinion.

  5. 2004 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2004-12-01

    The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The load resource balance of BPA and/or the region is determined by comparing resource availability to an expected level of total retail electricity consumption. Resources include projected energy capability plus contract purchases. Loads include a forecast of retail obligations plus contract obligations. Surplus energy is available when resources are greater than loads. This energy could be marketed to increase revenues. Energy deficits occur when resources are less than loads. These deficits could be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of loads due to economic conditions or closures, additional contract purchases, and/or the addition of new generating resources. The loads and resources analysis in this study simulates the operation of the power system under the current Pacific Northwest Coordination Agreement (PNCA). The PNCA defines the planning and operation of seventeen U.S. Pacific Northwest utilities and other parties with generating facilities within the region's hydroelectric (hydro) system. The hydroregulation study used for the 2004 White Book incorporates measures from the National Oceanographic and Atmospheric Administration Fisheries (NOAA Fisheries) Biological Opinion dated December 2000, and the U.S. Fish and Wildlife Service's 2000 Biological Opinion (2000 FCRPS BiOps) for the Snake River and Columbia River projects. These measures include: (1) Increased flow augmentation for juvenile fish migrations in the Snake and Columbia rivers in the spring and summer; (2) Mandatory spill requirements at the Lower Snake and Columbia dams to provide for non-turbine passage routes for juvenile fish migrants; and (3) Additional flows for Kootenai River white sturgeon in the spring; The hydroregulation criteria for this analysis includes the following: (1) Detailed Operation Plan operation for Treaty reservoirs for Operating Year (OY) 2004; (2) PNCA planning criteria for OY 2004; and (3) Juvenile fish bypass spill levels for 2000 FCRPS BiOps implementation. The 2004 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information for marketer contracts is not detailed due to confidentiality agreements. The 2004 White Book analysis updates the 2003 White Book. This analysis projects the yearly average energy consumption and resource availability for the study period, OY 2006 through 2015. The study shows the Federal system's and the region's expected monthly peak demand, monthly energy demand, monthly peak generating capability, and monthly energy generation for OY 2006, 2010, and 2015. The Federal system and regional monthly capacity surplus/deficit projections are summarized for the 10 operating years of the study period. This document analyzes the PNW's projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger PNW regional power system loads and resources that include the Federal system as well other PNW entities.

  6. Load controller and method to enhance effective capacity of a photovotaic power supply using a dynamically determined expected peak loading

    DOE Patents [OSTI]

    Perez, Richard (Delmar, NY)

    2003-04-01

    A load controller and method are provided for maximizing effective capacity of a non-controllable, renewable power supply coupled to a variable electrical load also coupled to a conventional power grid. Effective capacity is enhanced by monitoring power output of the renewable supply and loading, and comparing the loading against the power output and a load adjustment threshold determined from an expected peak loading. A value for a load adjustment parameter is calculated by subtracting the renewable supply output and the load adjustment parameter from the current load. This value is then employed to control the variable load in an amount proportional to the value of the load control parameter when the parameter is within a predefined range. By so controlling the load, the effective capacity of the non-controllable, renewable power supply is increased without any attempt at operational feedback control of the renewable supply. The expected peak loading of the variable load can be dynamically determined within a defined time interval with reference to variations in the variable load.

  7. 1996 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1996-12-01

    The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. Aside from these purposes, the White Book is used for input to BPA`s resource planning process. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). 11 figs., 12 tabs.

  8. Pollutant Assessments Group Procedures Manual: Volume 1, Administrative and support procedures

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    This manual describes procedures currently in use by the Pollutant Assessments Group. The manual is divided into two volumes: Volume 1 includes administrative and support procedures, and Volume 2 includes technical procedures. These procedures are revised in an ongoing process to incorporate new developments in hazardous waste assessment technology and changes in administrative policy. Format inconsistencies will be corrected in subsequent revisions of individual procedures. The purpose of the Pollutant Assessments Groups Procedures Manual is to provide a standardized set of procedures documenting in an auditable manner the activities performed by the Pollutant Assessments Group (PAG) of the Health and Safety Research Division (HASRD) of the Environmental Measurements and Applications Section (EMAS) at Oak Ridge National Laboratory (ORNL). The Procedures Manual ensures that the organizational, administrative, and technical activities of PAG conform properly to protocol outlined by funding organizations. This manual also ensures that the techniques and procedures used by PAG and other contractor personnel meet the requirements of applicable governmental, scientific, and industrial standards. The Procedures Manual is sufficiently comprehensive for use by PAG and contractor personnel in the planning, performance, and reporting of project activities and measurements. The Procedures Manual provides procedures for conducting field measurements and includes program planning, equipment operation, and quality assurance elements. Successive revisions of this manual will be archived in the PAG Document Control Department to facilitate tracking of the development of specific procedures.

  9. explicit representation of uncertainty in system load

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    system load - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear

  10. Adjustable Speed Drive Part-Load Efficiency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Adjustable Speed Drive Part-Load Efficiency An adjustable speed drive (ASD) is a device that controls the rotational speed of motor-driven equipment. Variable frequency drives (VFDs), the most common type of ASD, are solid-state electronic motor controllers that effciently meet varying process requirements by adjusting the frequency and voltage of power supplied to an alternating current (AC) motor to enable it to operate over a wide speed range. External sensors monitor fow, liquid levels, or

  11. Decades of Wind Turbine Load Simulation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Decades of Wind Turbine Load Simulation Matthew Barone ∗ , Joshua Paquette † , Brian Resor ‡ Sandia National Laboratories § , Albuquerque, NM 87185 Lance Manuel ¶ University of Texas, Austin, TX 78712 A high-performance computer was used to simulate ninety-six years of operation of a five megawatt wind turbine. Over five million aero-elastic simulations were performed, with each simulation consisting of wind turbine operation for a ten minute period in turbulent wind conditions. These

  12. Containment Unidirectional Resource Loading System (CURLS) | Argonne

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Laboratory Containment Unidirectional Resource Loading System (CURLS) Technology available for licensing: CURLS is a "tunnel" that installs in an existing glove port along with various co-designed resource cartridges that allow easy and rapid changeover of resources without losing containment. Allows for easy and rapid glovebox resource changes, while maintaining containment Can be mounted in existing glove ports, offering an array of fail-safe cartridges for all resource

  13. Loading relativistic Maxwell distributions in particle simulations

    SciTech Connect (OSTI)

    Zenitani, Seiji

    2015-04-15

    Numerical algorithms to load relativistic Maxwell distributions in particle-in-cell (PIC) and Monte-Carlo simulations are presented. For stationary relativistic Maxwellian, the inverse transform method and the Sobol algorithm are reviewed. To boost particles to obtain relativistic shifted-Maxwellian, two rejection methods are proposed in a physically transparent manner. Their acceptance efficiencies are ?50% for generic cases and 100% for symmetric distributions. They can be combined with arbitrary base algorithms.

  14. Isorropia Partitioning and Load Balancing Package

    Energy Science and Technology Software Center (OSTI)

    2006-09-01

    Isorropia is a partitioning and load balancing package which interfaces with the Zoltan library. Isorropia can accept input objects such as matrices and matrix-graphs, and repartition/redistribute them into a better data distribution on parallel computers. Isorropia is primarily an interface package, utilizing graph and hypergraph partitioning algorithms that are in the Zoltan library which is a third-party library to Tilinos.

  15. Minimum Day Time Load Calculation and Screening

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Minimum Day Time Load Calculation and Screening" Dora Nakafuji and Anthony Hong, Hawaiian Electric Co. Babak Enayati, DG Techincal Standards Review Group April 30, 2014 2 Speakers Babak Enayati Chair of Massachusetts DG Technical Standards Review Group Dora Nakafuji Director of Renewable Energy Planning Hawaiian Electric Company (HECO) Kristen Ardani Solar Analyst, (today's moderator) NREL Anthony Hong Director of Distribution Planning Hawaiian Electric Company (HECO) Standardization of

  16. Minimum Day Time Load Calculation and Screening

    Office of Environmental Management (EM)

    Distributed Generation Interconnection Collaborative (DGIC) "Minimum Day Time Load Calculation and Screening" Dora Nakafuji and Anthony Hong, Hawaiian Electric Co. Babak Enayati, DG Techincal Standards Review Group April 30, 2014 2 Speakers Babak Enayati Chair of Massachusetts DG Technical Standards Review Group Dora Nakafuji Director of Renewable Energy Planning Hawaiian Electric Company (HECO) Kristen Ardani Solar Analyst, (today's moderator) NREL Anthony Hong Director of

  17. TMACS Test Procedure TP011: Panalarm Interface

    SciTech Connect (OSTI)

    Seghers, R.; Washburn, S.J.

    1994-05-24

    The TMACS Software Test Procedures translate the project`s acceptance criteria into test steps. The TMACS Test Plan (WHC-SD-WM-TP-148) is fulfilled when all Test Cases are approved. This Test Procedure tests the TMACS Panalarm Interface functions.

  18. Procedures for ground-water investigations

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water monitoring procedures are developed and used in accordance with the PNL Quality Assurance Program.

  19. Model Development and Loads Analysis of a Wind Turbine on a Floating Offshore Tension Leg Platform

    SciTech Connect (OSTI)

    Matha, D.; Fischer, T.; Kuhn, M.; Jonkman, J.

    2010-02-01

    This report presents results of the analysis of a 5-MW wind turbine located on a floating offshore tension leg platform (TLP) that was conducted using the fully coupled time-domain aero-hydro-servo-elastic design code FAST with AeroDyn and HydroDyn. Models in this code are of greater fidelity than most of the models that have been used to analyze floating turbines in the past--which have neglected important hydrodynamic and mooring system effects. The report provides a description of the development process of a TLP model, which is a modified version of a Massachusetts Institute of Technology design derived from a parametric linear frequency-domain optimization process. An extensive loads and stability analysis for ultimate and fatigue loads according to the procedure of the International Electrotechnical Commission offshore wind turbine design standard was performed with the verified TLP model. Response statistics, extreme event tables, fatigue lifetimes, and selected time histories of design-driving extreme events are analyzed and presented. Loads for the wind turbine on the TLP are compared to those of an equivalent land-based turbine in terms of load ratios. Major instabilities for the TLP are identified and described.

  20. Elevated Temperature Primary Load Design Method Using Pseudo Elastic-Perfectly Plastic Model

    SciTech Connect (OSTI)

    Carter, Peter; Sham, Sam; Jetter, Robert I

    2012-01-01

    A new primary load design method for elevated temperature service has been developed. Codification of the procedure in an ASME Boiler and Pressure Vessel Code, Section III Code Case is being pursued. The proposed primary load design method is intended to provide the same margins on creep rupture, yielding and creep deformation for a component or structure that are implicit in the allowable stress data. It provides a methodology that does not require stress classification and is also applicable to a full range of temperature above and below the creep regime. Use of elastic-perfectly plastic analysis based on allowable stress with corrections for constraint, steady state stress and creep ductility is described. This approach is intended to ensure that traditional primary stresses are the basis for design, taking into account ductility limits to stress re-distribution and multiaxial rupture criteria.

  1. Load test of the 283W Clearwell Roof Deck and Support Structure

    SciTech Connect (OSTI)

    McCoy, R.M.

    1994-09-12

    The 283W Clearwell roof area was load tested according to the approved load-test procedure, WHC-SD-GN-TP-30015, Revision 0, as modified below. The 283W Clearwell is located in the 200 West Area of the Hanford Site and has the following characteristics: Roof deck - concrete slab supported by columns and walls; Roof membrane - tar and gravel; Roof slope - flat (< 10 deg); and Roof elevation - approximately 6 in. above ground level. The 283W Clearwell was visited in April 1993 for a visual inspection, but could not be inspected because of the confined space requirements. It was revisited in February 1994 for the purpose of writing this test report. Because the roof could not be inspected, a test was determined to be the best way to qualify the roof for personnel access.

  2. AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Neighborhood Electric Vehicle Specifications and Test Procedures AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures PDF icon NEVAmerica Technical Specifications ...

  3. SLUDGE TREATMENT PROJECT COST COMPARISON BETWEEN HYDRAULIC LOADING AND SMALL CANISTER LOADING CONCEPTS

    SciTech Connect (OSTI)

    GEUTHER J; CONRAD EA; RHOADARMER D

    2009-08-24

    The Sludge Treatment Project (STP) is considering two different concepts for the retrieval, loading, transport and interim storage of the K Basin sludge. The two design concepts under consideration are: (1) Hydraulic Loading Concept - In the hydraulic loading concept, the sludge is retrieved from the Engineered Containers directly into the Sludge Transport and Storage Container (STSC) while located in the STS cask in the modified KW Basin Annex. The sludge is loaded via a series of transfer, settle, decant, and filtration return steps until the STSC sludge transportation limits are met. The STSC is then transported to T Plant and placed in storage arrays in the T Plant canyon cells for interim storage. (2) Small Canister Concept - In the small canister concept, the sludge is transferred from the Engineered Containers (ECs) into a settling vessel. After settling and decanting, the sludge is loaded underwater into small canisters. The small canisters are then transferred to the existing Fuel Transport System (FTS) where they are loaded underwater into the FTS Shielded Transfer Cask (STC). The STC is raised from the basin and placed into the Cask Transfer Overpack (CTO), loaded onto the trailer in the KW Basin Annex for transport to T Plant. At T Plant, the CTO is removed from the transport trailer and placed on the canyon deck. The CTO and STC are opened and the small canisters are removed using the canyon crane and placed into an STSC. The STSC is closed, and placed in storage arrays in the T Plant canyon cells for interim storage. The purpose of the cost estimate is to provide a comparison of the two concepts described.

  4. Inverse Load Calculation of Wind Turbine Support Structures - A Numerical Verification Using the Comprehensive Simulation Code FAST: Preprint (Revised)

    SciTech Connect (OSTI)

    Pahn, T.; Jonkman, J.; Rolges, R.; Robertson, A.

    2012-11-01

    Physically measuring the dynamic responses of wind turbine support structures enables the calculation of the applied loads using an inverse procedure. In this process, inverse means deriving the inputs/forces from the outputs/responses. This paper presents results of a numerical verification of such an inverse load calculation. For this verification, the comprehensive simulation code FAST is used. FAST accounts for the coupled dynamics of wind inflow, aerodynamics, elasticity and turbine controls. Simulations are run using a 5-MW onshore wind turbine model with a tubular tower. Both the applied loads due to the instantaneous wind field and the resulting system responses are known from the simulations. Using the system responses as inputs to the inverse calculation, the applied loads are calculated, which in this case are the rotor thrust forces. These forces are compared to the rotor thrust forces known from the FAST simulations. The results of these comparisons are presented to assess the accuracy of the inverse calculation. To study the influences of turbine controls, load cases in normal operation between cut-in and rated wind speed, near rated wind speed and between rated and cut-out wind speed are chosen. The presented study shows that the inverse load calculation is capable of computing very good estimates of the rotor thrust. The accuracy of the inverse calculation does not depend on the control activity of the wind turbine.

  5. Resolved: "error while loading shared libraries: libalpslli.so...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    "error while loading shared libraries: libalpslli.so.0" with serial codes on login nodes Resolved: "error while loading shared libraries: libalpslli.so.0" with serial codes on...

  6. Transmission Reliability "Load as a Resource" Peer Review Materials...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "Load as a Resource" Peer Review Materials Now Available Transmission Reliability "Load as a Resource" Peer Review Materials Now Available September 25, 2014 - 11:43am Addthis OE's...

  7. Health Code Number (HCN) Development Procedure

    SciTech Connect (OSTI)

    Petrocchi, Rocky; Craig, Douglas K.; Bond, Jayne-Anne; Trott, Donna M.; Yu, Xiao-Ying

    2013-09-01

    This report provides the detailed description of health code numbers (HCNs) and the procedure of how each HCN is assigned. It contains many guidelines and rationales of HCNs. HCNs are used in the chemical mixture methodology (CMM), a method recommended by the department of energy (DOE) for assessing health effects as a result of exposures to airborne aerosols in an emergency. The procedure is a useful tool for proficient HCN code developers. Intense training and quality assurance with qualified HCN developers are required before an individual comprehends the procedure to develop HCNs for DOE.

  8. California Customer Load Reductions during the Electricity Crisis...

    Open Energy Info (EERE)

    URI: cleanenergysolutions.orgcontentcalifornia-customer-load-reductions-d Language: English Policies: Regulations Regulations: MandatesTargets This report details the...

  9. ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern...

    U.S. Energy Information Administration (EIA) Indexed Site

    e. Historical Noncoincident Summer Peak Load, Actual by North American Electric Reliability Corporation Region, 2005 through 2009 " ,"(Megawatts)" ,,,,," " ,"Summer Noncoincident...

  10. Records Management Exit Procedures | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    purpose of this brochure is to provide records exit procedures for Federal and contractor employees who are departing on a permanent basis or for an extended period of time for...

  11. Financial Policy and Procedures for Reimbursable Work

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-08-15

    The directive establishes Department-wide financial policy and procedural guidance applicable to performing reimbursable work for other Federal agencies and with non-Federal Government entities, including foreign and commercial entities, State, and political subdivisions.

  12. Presidential Permits - Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Permits - Procedures Presidential Permits - Procedures Executive Order 12038 states that, before a Presidential permit may be issued, the action must be found to be consistent with the public interest. The two criteria used by DOE to determine if a proposed project is consistent with the public interest are: Environmental Impact - The National Environmental Policy Act of 1969 (NEPA) requires that Federal agencies give due consideration to the environmental consequences of their actions. Pursuant

  13. Export Authorizations - Procedures | Department of Energy

    Energy Savers [EERE]

    Export Authorizations - Procedures Export Authorizations - Procedures Part II, Section 202(e) of the Federal Power Act (FPA) states that exports of electric energy should be allowed unless the proposed export would impair the sufficiency of electric power supply within the U.S. or would impede or tend to impede the coordinated use of the U.S. power supply network. Based on these guidelines, DOE will grant authorization to export electric energy if it is determined that: 1.Sufficient generating

  14. Microsoft Word - EPRR_procedures_030316.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 3, 2016 1 Procedure No. Title/Description Administrative EP-AP-10003 Records Management EP-AP-10007 Technical Procedure Development ER-AP-20272 Environmental Remediation Project (ER) Readiness Review EP-DIR-AP-10020 Document Development for Environmental Programs EP-DIR-AP-10070 Peer Review of Environmental Programs Documents EP-DIV-SOP-20156 Quality Check for Preparation of Data Sets from the LANL Environmental Information Management Database EP-DIV-SOP-20016 Identification and

  15. Quality Procedure - Independent Assessments | Department of Energy

    Energy Savers [EERE]

    Independent Assessments Quality Procedure - Independent Assessments This procedure establishes the process for planning, performing, and reporting Independent Assessments (i.e., assist visits, program/project reviews, direct observations, etc.) as conducted by the Office of Standards and Quality Assurance. Independent assessments are performed at EM Headquarters and Field Offices to determine compliance to requirements and to identify systemic issues, potential risk, emerging issues, and for

  16. Quality Procedure - Lessons Learned | Department of Energy

    Energy Savers [EERE]

    Lessons Learned Quality Procedure - Lessons Learned The purpose of this Quality Procedure is to assist the Office of Standards and Quality Assurance personnel during the execution and operation of its activities, specifically in oversight activities, to compile and disseminate information related to lessons learned. The purpose of lessons learned is to share and use knowledge derived from experience to promote the recurrence of desirable outcomes, or preclude the recurrence of undesirable

  17. Environmental Programs Procedure Preparation, Revision, Review, Approval,

    Office of Environmental Management (EM)

    and Use | Department of Energy Environmental Programs Procedure Preparation, Revision, Review, Approval, and Use Environmental Programs Procedure Preparation, Revision, Review, Approval, and Use The documents included in this listing are additional references not included in the Phase 2 Radiological Release at the Waste Isolation Pilot Plant, Attachment F: Bibliography and References report. The documents were examined and used to develop the final report. PDF icon Environmental Programs

  18. DNS Policies & Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DNS Policies & Procedures DNS Policies & Procedures DNS Policy Every Federal agency must use only .gov, .mil, or Fed.us domains unless the agency head explicitly determines another domain is necessary for the proper performance of an agency function. Why is this important? Visitors looking for official government information must be confident that is what they are getting. Many websites exist that resemble government websites or that appear to provide "official" government

  19. Emergency Response & Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Security + Safety » Emergency Response & Procedures Emergency Response & Procedures November 3, 2015 Power lines like these make up our nation's power grid -- a critical component of our national critical infrastructure. National Critical Infrastructure Security and Resilience Month: Improving the Security and Resilience of the Nation's Grid November is National Critical Infrastructure Security and Resilience Month, and our Office of Electricity (OE) is hard at work

  20. Analyzing Design Heating Loads in Superinsulated Buildings

    SciTech Connect (OSTI)

    Arena, Lois

    2015-06-01

    Super-insulated homes offer many benefits including improved comfort, reduced exterior noise penetration, lower energy bills, and the ability to withstand power and fuel outages under much more comfortable conditions than a typical home. While these homes aren't necessarily constructed with excessive mass in the form of concrete floors and walls, the amount of insulation and the increase in the thickness of the building envelope can lead to a mass effect, resulting in the structures ability to store much more heat than a code built home. This results in a very low thermal inertia making the building much less sensitive to drastic temperature swings thereby decreasing the peak heating load demand. During the winter of 2013/2014, CARB monitored the energy use of three homes in climate zone 6 in an attempt to evaluate the accuracy of two different mechanical system sizing methods for low load homes. Based on the results, it is recommended that internal and solar gains be included and some credit for thermal inertia be used in sizing calculations for super insulated homes.

  1. Analyzing Design Heating Loads in Superinsulated Buildings

    SciTech Connect (OSTI)

    Arena, Lois

    2015-06-16

    The U.S. Department of Energy’s Building America research team Consortium for Advanced Residential Buildings (CARB) worked with the EcoVillage cohousing community in Ithaca, New York, on the Third Residential EcoVillage Experience neighborhood. This communityscale project consists of 40 housing units—15 apartments and 25 single-family residences. Units range in size from 450 ft2 to 1,664 ft2 and cost from $80,000 for a studio apartment to $235,000 for a three- or four-bedroom single-family home. For the research component of this project, CARB analyzed current heating system sizing methods for superinsulated homes in cold climates to determine if changes in building load calculation methodology should be recommended. Actual heating energy use was monitored and compared to results from the Air Conditioning Contractors of America’s Manual J8 (MJ8) and the Passive House Planning Package software. Results from that research indicate that MJ8 significantly oversizes heating systems for superinsulated homes and that thermal inertia and internal gains should be considered for more accurate load calculations.

  2. DC switching regulated power supply for driving an inductive load

    DOE Patents [OSTI]

    Dyer, George R. (Norris, TN)

    1986-01-01

    A power supply for driving an inductive load current from a dc power supply hrough a regulator circuit including a bridge arrangement of diodes and switching transistors controlled by a servo controller which regulates switching in response to the load current to maintain a selected load current. First and second opposite legs of the bridge are formed by first and second parallel-connected transistor arrays, respectively, while the third and fourth legs of the bridge are formed by appropriately connected first and second parallel connected diode arrays, respectively. The regulator may be operated in three "stages" or modes: (1) For current runup in the load, both first and second transistor switch arrays are turned "on" and current is supplied to the load through both transistor arrays. (2) When load current reaches the desired level, the first switch is turned "off", and load current "flywheels" through the second switch array and the fourth leg diode array connecting the second switch array in series with the load. Current is maintained by alternating between modes 1 and 2 at a suitable duty cycle and switching rate set by the controller. (3) Rapid current rundown is accomplished by turning both switch arrays "off", allowing load current to be dumped back into the source through the third and fourth diode arrays connecting the source in series opposition with the load to recover energy from the inductive load. The three operating states are controlled automatically by the controller.

  3. DC switching regulated power supply for driving an inductive load

    DOE Patents [OSTI]

    Dyer, G.R.

    1983-11-29

    A dc switching regulated power supply for driving an inductive load is provided. The regulator basic circuit is a bridge arrangement of diodes and transistors. First and second opposite legs of the bridge are formed by first and second parallel-connected transistor arrays, respectively, while the third and fourth legs of the bridge are formed by appropriately connected first and second parallel connected diode arrays, respectively. A dc power supply is connected to the input of the bridge and the output is connected to the load. A servo controller is provided to control the switching rate of the transistors to maintain a desired current to the load. The regulator may be operated in three stages or modes: (1) for current runup in the load, both first and second transistor switch arrays are turned on and current is supplied to the load through both transistor arrays. (2) When load current reaches the desired level, the first switch is turned off, and load current flywheels through the second switch array and the fourth leg diode array connecting the second switch array in series with the load. Current is maintained by alternating between modes 1 and 2 at a suitable duty cycle and switching rate set by the controller. (3) Rapid current rundown is accomplished by turning both switch arrays off, allowing load current to be dumped back into the source through the third and fourth diode arrays connecting the source in series opposition with the load to recover energy from the inductive load.

  4. Piezoelectric film load cell robot collision detector

    DOE Patents [OSTI]

    Lembke, J.R.

    1988-03-15

    A piezoelectric load cell which can be utilized for detecting collisions and obstruction of a robot arm end effector includes a force sensing element of metallized polyvinylidene fluoride (PVDF) film. The piezoelectric film sensing element and a resilient support pad are clamped in compression between upper and lower plates. The lower plate has a central recess in its upper face for supporting the support pad and sensing element, while the upper plate has a corresponding central projection formed on its lower face for bearing on the sensing element and support pad. The upper and lower plates are dowelled together for concentric alignment and screwed together. The upper and lower plates are also adapted for mounting between the robot arm wrist and end effector. 3 figs.

  5. Piezoelectric film load cell robot collision detector

    DOE Patents [OSTI]

    Lembke, J.R.

    1989-04-18

    A piezoelectric load cell which can be utilized for detecting collisions and obstruction of a robot arm end effector includes a force sensing element of metallized polyvinylidene fluoride (PVDF) film. The piezoelectric film sensing element and a resilient support pad are clamped in compression between upper and lower plates. The lower plate has a central recess in its upper face for supporting the support pad and sensing element, while the upper plate has a corresponding central projection formed on its lower face for bearing on the sensing element and support pad. The upper and lower plates are doweled together for concentric alignment and screwed together. The upper and lower plates are also adapted for mounting between the robot arm wrist and end effector. 3 figs.

  6. Piezoelectric film load cell robot collision detector

    DOE Patents [OSTI]

    Lembke, John R.

    1989-04-18

    A piezoelectric load cell which can be utilized for detecting collisions and obstruction of a robot arm end effector includes a force sensing element of metallized polyvinylidene fluoride (PVDF) film. The piezoelectric film sensing element and a resilient support pad are clamped in compression between upper and lower plates. The lower plate has a central recess in its upper face for supporting the support pad and sensing element, while the upper plate has a corresponding central projection formed on its lower face for bearing on the sensing element and support pad. The upper and lower plates are dowelled together for concentric alignment and screwed together. The upper and lower plates are also adapted for mounting between the robot arm wrist and end effector.

  7. Active load control techniques for wind turbines.

    SciTech Connect (OSTI)

    van Dam, C.P.; Berg, Dale E.; Johnson, Scott J.

    2008-07-01

    This report provides an overview on the current state of wind turbine control and introduces a number of active techniques that could be potentially used for control of wind turbine blades. The focus is on research regarding active flow control (AFC) as it applies to wind turbine performance and loads. The techniques and concepts described here are often described as 'smart structures' or 'smart rotor control'. This field is rapidly growing and there are numerous concepts currently being investigated around the world; some concepts already are focused on the wind energy industry and others are intended for use in other fields, but have the potential for wind turbine control. An AFC system can be broken into three categories: controls and sensors, actuators and devices, and the flow phenomena. This report focuses on the research involved with the actuators and devices and the generated flow phenomena caused by each device.

  8. Fracture of surface cracks loaded in bending

    SciTech Connect (OSTI)

    Chao, Y.J.; Reuter, W.G.

    1997-12-31

    Theoretical background of the constraint effect in brittle fracture of solids is reviewed. Fracture test data from D6-aC, a high strength steel, using three-point-bend (SE(B)) specimens and surface cracked plate (SC(B)) specimens under bending are presented. It is shown that the SE(B) data has an elevated fracture toughness for increasing a/W, i.e., a crack geometry with a larger T/K corresponds to a higher K{sub c} which is consistent with the theoretical prediction. The fundamental fracture properties, i.e., the critical strain and the critical distance, determined from the SE(B) test data are then applied to the interpretation and prediction of the SC(B) test data. Reasonable agreement is achieved for the crack growth initiation site and the load.

  9. net_energy_load_2003.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    3 and Projected 2004 through 2008 (Thousands of Megawatthours and 2003 Base Year) Net Energy For Load (Annual) Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Projected Year Base Year ECAR FRCC MAAC MAIN MAPP (U.S.) NPCC (U.S.) SERC SPP ERCOT WECC (U.S.) 1990 2,886,496 442,507 142,502 221,099 197,326 127,102 250,681 485,205 252,037 209,789 558,248 1991 2,941,669 450,586 146,903 228,588 205,880 129,826 253,701 501,794 257,434 211,568 555,389 1992 2,942,910 450,853 147,464

  10. net_energy_load_2004.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    4 and Projected 2005 through 2009 (Thousands of Megawatthours and 2004 Base Year) Net Energy For Load (Annual) Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Projected Year Base Year ECAR FRCC MAAC MAIN MAPP/MRO (U.S.) NPCC (U.S.) SERC SPP ERCOT WECC (U.S.) 1990 2,886,496 442,507 142,502 221,099 197,326 127,102 250,681 485,205 252,037 209,789 558,248 1991 2,941,669 450,586 146,903 228,588 205,880 129,826 253,701 501,794 257,434 211,568 555,389 1992 2,942,910 450,853

  11. net_energy_load_2005.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    2005 and Projected 2006 through 2010 (Thousands of Megawatthours and 2005 Base Year) Net Energy For Load (Annual) Contiguous U.S. Eastern Power Grid Texas Power Grid Western Power Grid Projected Year Base Year FRCC MRO (U.S.) NPCC (U.S.) RFC SERC SPP ERCOT WECC (U.S.) 2005 3,900,461 226,544 216,633 303,607 1,005,226 962,054 201,548 299,225 685,624 Projected Contiguous U.S. FRCC MRO (U.S.) NPCC (U.S.) RFC SERC SPP ERCOT WECC (U.S.) In 2005 for 2006 3,926,389 232,561 220,006 301,893 992,742

  12. net_energy_load_2010.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Assessment Area, 1990-2010 Actual, 2011-2015 Projected (Thousands of Megawatthours) Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 FRCC 142,502 146,903 147,464 153,468 159,861 169,021 173,377 175,557 188,384 188,598 196,561 200,134 211,116 NPCC 250,681 253,701 252,256 257,447 259,947 261,235 263,125 264,464 268,309 277,902 281,518 282,670

  13. Quality Procedure - Approved Suppliers List | Department of Energy

    Energy Savers [EERE]

    Approved Suppliers List Quality Procedure - Approved Suppliers List This procedure establishes the responsibilities, process, and records for developing and maintaining the Approved Suppliers List (ASL) for EM Headquarters Office of Standards and Quality Assurance in accordance with EM-QA-001, Environmental Management Quality Assurance Program. PDF icon Quality Procedure - Approved Suppliers List More Documents & Publications Quality Procedure - Supplier Qualification Quality Procedure -

  14. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Data Loading Manual

    SciTech Connect (OSTI)

    C. L. Smith; K. J. Kvarfordt; S. T. Wood

    2008-08-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory. This report is intended to assist the user to enter PRA data into the SAPHIRE program using the built-in MAR-D ASCII-text file data transfer process. Towards this end, a small sample database is constructed and utilized for demonstration. Where applicable, the discussion includes how the data processes for loading the sample database relate to the actual processes used to load a larger PRA models. The procedures described herein were developed for use with SAPHIRE Version 6.0 and Version 7.0. In general, the data transfer procedures for version 6 and 7 are the same, but where deviations exist, the differences are noted. The guidance specified in this document will allow a user to have sufficient knowledge to both understand the data format used by SAPHIRE and to carry out the transfer of data between different PRA projects.

  15. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Data Loading Manual

    SciTech Connect (OSTI)

    C. L. Smith; K. J. Kvarfordt; S. T. Wood

    2006-07-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory. This report is intended to assist the user to enter PRA data into the SAPHIRE program using the built-in MAR-D ASCII-text file data transfer process. Towards this end, a small sample database is constructed and utilized for demonstration. Where applicable, the discussion includes how the data processes for loading the sample database relate to the actual processes used to load a larger PRA models. The procedures described herein were developed for use with SAPHIRE Version 6.0 and Version 7.0. In general, the data transfer procedures for version 6 and 7 are the same, but where deviations exist, the differences are noted. The guidance specified in this document will allow a user to have sufficient knowledge to both understand the data format used by SAPHIRE and to carry out the transfer of data between different PRA projects.

  16. Procedures for meeting NRC antitrust responsibilities

    SciTech Connect (OSTI)

    Toalston, A.L.; Messier, M.E.; Lambe, W.M.; Nicholson, P.R.

    1985-05-01

    This report describes the procedures used by NRC staff to implement the antitrust review and enforcement prescribed in Sections 105 and 186 of the Atomic Energy Act of 1954, as amended (the Act), as covered largely by the Commission's Rules and Regulations in 10 CFR Parts 2.101, 2.102, 2.200, 50.33a, 50.80, and 50.90. These procedures set forth the steps and criteria the staff applies in the antitrust review of construction permit and operating license applications and the amendments to those applications that deal with changes in ownership. In addition, the procedures describe how the staff enforces compliance by licensees when antitrust conditions have been appended to construction permits and operating licenses.

  17. Procedures for ground-water investigations

    SciTech Connect (OSTI)

    Not Available

    1989-09-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water investigations are carried out to fulfill the requirements for the US Department of Energy (DOE) to meet the requirements of DOE Orders. Investigations are also performed for various clients to meet the requirements of the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). National standards including procedures published by the American Society for Testing and Materials (ASTM) and the US Geological Survey were utilized in developing the procedures contained in this manual.

  18. Simulation-Length Requirements in the Loads Analysis of Offshore Floating Wind Turbines: Preprint

    SciTech Connect (OSTI)

    Haid, L.; Stewart, G.; Jonkman, J.; Robertson, A.; Lackner, M.; Matha, D.

    2013-06-01

    The goal of this paper is to examine the appropriate length of a floating offshore wind turbine (FOWT) simulation - a fundamental question that needs to be answered to develop design requirements. To examine this issue, a loads analysis of an example FOWT was performed in FAST with varying simulation lengths. The offshore wind system used was the OC3-Hywind spar buoy, which was developed for use in the International Energy Agency Code Comparison Collaborative Project and supports NREL's offshore 5-megawatt baseline turbine. Realistic metocean data from the National Oceanic and Atmospheric Administration and repeated periodic wind files were used to excite the structure. The results of the analysis clearly show that loads do not increase for longer simulations. In regards to fatigue, a sensitivity analysis shows that the procedure used for counting half cycles is more important than the simulation length itself. Based on these results, neither the simulation length nor the periodic wind files affect response statistics and loads for FOWTs (at least for the spar studied here); a result in contrast to the offshore oil and gas industry, where running simulations of at least 3 hours in length is common practice.

  19. Challenges and Potential Solutions for Reducing Climate Control Loads in Conventional and Hybrid Vehicles

    SciTech Connect (OSTI)

    Farrington, R.B., Anderson, R., Blake, D.M., Burch, S.D.; Cuddy, M.R., Keyser, M.A., Rugh, J.P.

    1999-01-01

    The National Renewable Energy Laboratory, a U.S. Department of Energy national laboratory, is collaborating with U.S. automotive manufacturers to develop innovative techniques to reduce national fuel consumption and vehicle tailpipe emissions by reducing vehicle climate control loads. A new U.S. emissions test, the Supplemental Federal Test Procedure (SFTP), will soon begin measuring tailpipe emissions with the air conditioning system operating. Modeled results show that emissions of oxides of nitrogen (NOx) and carbon monoxide (CO) more than double during the air conditioning part of the SFTP. Reducing the transmittance of the glazing can have a greater impact on the cabin soak temperature than ventilating the vehicle during a hot soak. Reducing the amount of outside air can decrease cooling and heating loads but requires that the recirculated air be cleaned. We discuss a photocatalytic oxidation air-cleaning process for removing volatile organic compounds and bioareosols. We conclude with an example of modeling the thermal comfort of the occupants. An auxiliary load increase of only 400 Watts (W) results in a 0.4 km/L (1 mpg) decrease for a conventional 11.9-L/100-km (28-mpg) vehicle. If every vehicle in the United States were to save only 0.4 km/L (1 mpg), $4 billion (U.S. dollars) would be saved annually in gasoline and oil costs. Further information can be found at http://www.ctts.nrel.gov/auxload.html.

  20. Load test of the 277W Building high bay roof deck and support structure

    SciTech Connect (OSTI)

    McCoy, R.M.

    1994-12-02

    The 277W Building high bay roof area was load tested according to the approved load-test procedure, WHC-SD-GN-TP-30015, Revision 1. The 277W Building is located in the 200 West Area of the Hanford Site and has the following characteristics: roof deck -- wood decking supported by 4 x 14 timber purlins; roof membrane -- tar and gravel; roof slope -- flat (<10 deg); and roof elevation -- maximum height of about 63 ft. The 227W Building was visited in March 1994 for a visual inspection. During this inspection, cracked areas were visible in the decking, but it was not possible to determine whether these cracks extended completely through the decking, which is 2-in. thick. The building was revisited in March 1994 for the purpose of writing this test report. Because the roof requires personnel access, a test was determined to be the best way to qualify the roof. The conclusions are that the roof has been qualified for 500-lb total roof load and that the ``No Roof Access`` signs can be changed to ``Roof Access Restricted`` signs.

  1. Hanford Site Lockout/Tagout Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0336 Revision 2A Hanford Site Lockout/Tagout Procedure Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Approved for Public Release; Further Dissemination Unlimited DOE-0336, Rev. 2A Hanford Site Lockout/Tagout Procedure Published Date: 01-04-2016 Effective Date: 04-18-2016 ii CHANGE SUMMARY Rev# Section Changed Change Details 2 Section 1.0, Section 2.0 Removes the ability for users to use DOE-0336 for equipment configuration. 2 Section 5.1, Section

  2. Year 2000 TWRS Maintenance procedure review report

    SciTech Connect (OSTI)

    ADAMS, M.R.

    1999-02-24

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K.

  3. DOT-7A packaging test procedure

    SciTech Connect (OSTI)

    Kelly, D.L.

    1995-01-23

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes.

  4. Coordinate Measuring Machine Pit Artifact Inspection Procedure

    SciTech Connect (OSTI)

    Montano, Joshua D.

    2012-07-31

    The goal of this document is to outline a procedure for dimensional measurement of Los Alamos National Laboratory's CMM Pit Artifact. This procedure will be used by the Manufacturing Practice's Inspection Technology Subgroup of the Interagency Manufacturing Operations Group and Joint Operations Weapon Operations Group (IMOG/JOWOG 39) round robin participants. The intent is to assess the state of industry within the Nuclear Weapons Complex for measurements made on this type of part and find which current measurement strategies and techniques produce the best results.

  5. Official Use Only and Sensitive Document Destruction Procedure | The Ames

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Official Use Only and Sensitive Document Destruction Procedure Version Number: 0 Document Number: Procedure 48202.001 Effective Date: 01/2012 File (public): PDF icon procedure_48202.001_rev0

  6. PROCEDURE FOR CONDUCTING A RECORDS INVENTORY | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CONDUCTING A RECORDS INVENTORY PROCEDURE FOR CONDUCTING A RECORDS INVENTORY PROCEDURE FOR CONDUCTING A RECORDS INVENTORY PDF icon PROCEDURE FOR CONDUCTING A RECORDS INVENTORY More Documents & Publications Records Management Handbook Records Management Handbook Information and Records Management Transition Guidance

  7. Summative Mass Analysis of Algal Biomass - Integration of Analytical Procedures: Laboratory Analytical Procedure (LAP)

    SciTech Connect (OSTI)

    Laurens, L. M. L.

    2013-12-01

    This procedure guides the integration of laboratory analytical procedures to measure algal biomass constituents in an unambiguous manner and ultimately achieve mass balance closure for algal biomass samples. Many of these methods build on years of research in algal biomass analysis.

  8. Optical based tactile shear and normal load sensor

    DOE Patents [OSTI]

    Salisbury, Curt Michael

    2015-06-09

    Various technologies described herein pertain to a tactile sensor that senses normal load and/or shear load. The tactile sensor includes a first layer and an optically transparent layer bonded together. At least a portion of the first layer is made of optically reflective material. The optically transparent layer is made of resilient material (e.g., clear silicone rubber). The tactile sensor includes light emitter/light detector pair(s), which respectively detect either normal load or shear load. Light emitter(s) emit light that traverses through the optically transparent layer and reflects off optically reflective material of the first layer, and light detector(s) detect and measure intensity of reflected light. When a normal load is applied, the optically transparent layer compresses, causing a change in reflected light intensity. When shear load is applied, a boundary between optically reflective material and optically absorptive material is laterally displaced, causing a change in reflected light intensity.

  9. Test Procedure Development and Revision | Department of Energy

    Energy Savers [EERE]

    Test Procedure Development and Revision Test Procedure Development and Revision Most energy conservation standards rulemakings are accompanied by a concurrent test procedure rulemaking. Test procedures detail the protocols that manufacturers must follow when testing their products for compliance with Department of Energy (DOE) standards. DOE also uses the test procedures to determine compliance with the applicable standards in any verification or enforcement testing. The procedures specify how

  10. Special Access Program Policies, Responsibilities, and Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-07-11

    Special Access Program Policies, Responsibilities, and Procedures This Manual is for OFFICIAL USE ONLY and will not be distributed on the Directives Portal. For distribution, please contact the Director, Office of Security, at 202-586-6775. Cancels: DOE M 471.2-3

  11. Proposal Submittal and Scheduling Procedures for Macromolecular

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Crystallography | Stanford Synchrotron Radiation Lightsource Proposal Submittal and Scheduling Procedures for Macromolecular Crystallography Beam time for macromolecular crystallography projects is obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit and rating and for criticality of synchrotron radiation use. Proposal

  12. CBEI: Virtual Refrigerant Charge Sensing and Load Metering - 2015 Peer

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review | Department of Energy Virtual Refrigerant Charge Sensing and Load Metering - 2015 Peer Review CBEI: Virtual Refrigerant Charge Sensing and Load Metering - 2015 Peer Review Presenter: James Braun, Purdue University View the Presentation PDF icon CBEI: Virtual Refrigerant Charge Sensing and Load Metering - 2015 Peer Review More Documents & Publications CBEI: FDD for Advanced RTUs - 2015 Peer Review Control and Diagnostics for Rooftop Units - 2014 BTO Peer Review CBEI: Coordinating

  13. LDRD final report : mesoscale modeling of dynamic loading of heterogeneous

    Office of Scientific and Technical Information (OSTI)

    materials. (Technical Report) | SciTech Connect Technical Report: LDRD final report : mesoscale modeling of dynamic loading of heterogeneous materials. Citation Details In-Document Search Title: LDRD final report : mesoscale modeling of dynamic loading of heterogeneous materials. Material response to dynamic loading is often dominated by microstructure (grain structure, porosity, inclusions, defects). An example critically important to Sandia's mission is dynamic strength of polycrystalline

  14. Local Soot Loading Distribution in Cordierite Diesel Particulate Filters by

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dynamic Neutron Radiography | Department of Energy Local Soot Loading Distribution in Cordierite Diesel Particulate Filters by Dynamic Neutron Radiography Local Soot Loading Distribution in Cordierite Diesel Particulate Filters by Dynamic Neutron Radiography Quantitative analysis of the soot loading and soot distribution for Cordierite type DPFs are studied under controlled conditions. PDF icon deer10_harvel.pdf More Documents & Publications Neutron Imaging of Diesel Particulate Filters

  15. LDRD final report : mesoscale modeling of dynamic loading of heterogeneous

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    materials. (Technical Report) | SciTech Connect LDRD final report : mesoscale modeling of dynamic loading of heterogeneous materials. Citation Details In-Document Search Title: LDRD final report : mesoscale modeling of dynamic loading of heterogeneous materials. Material response to dynamic loading is often dominated by microstructure (grain structure, porosity, inclusions, defects). An example critically important to Sandia's mission is dynamic strength of polycrystalline metals where

  16. CoolCab Truck Thermal Load Reduction | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Truck Thermal Load Reduction CoolCab Truck Thermal Load Reduction 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C. PDF icon vssp_09_proc.pdf More Documents & Publications CoolCab Test and Evaluation CoolCab Thermal Load Reduction Project: CoolCalc HVAC Tool Development

  17. Technical Assistance to ISO's and Grid Operators For Loads Providing

    Energy Savers [EERE]

    Ancillary Services To Enhance Grid Reliability | Department of Energy Technical Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability Technical Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability Project demonstrates and promotes the use of responsive load to provide ancillary services; helps ISOsand grid operators understand the resource and how best to apply it. PDF icon Technical

  18. Thermal Cycling Combined with Dynamic Mechanical Load: Preliminary Report |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Thermal Cycling Combined with Dynamic Mechanical Load: Preliminary Report Thermal Cycling Combined with Dynamic Mechanical Load: Preliminary Report This PowerPoint presentation summarizes the efforts of the team led by ESPEC Corp. to investigate thermal cycling combined with dynamic mechanical load, a solar project funded by the SunShot Initiative. PDF icon pvmrw13_tmf_espec_tanahashi.pdf More Documents & Publications Failure and Degradation Modes of PV Modules in a

  19. Load Participation in Ancillary Services Workshop Materials | Department of

    Office of Environmental Management (EM)

    Energy Load Participation in Ancillary Services Workshop Materials Load Participation in Ancillary Services Workshop Materials In October 2011, the U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE) and Office of Electricity Delivery and Energy Reliability (OE), hosted a two-day workshop in Washington, DC to examine technical, institutional, economic, regulatory, and policy issues regarding the participation of load as a provider of ancillary services

  20. Strategy Guideline. Accurate Heating and Cooling Load Calculations

    SciTech Connect (OSTI)

    Burdick, Arlan

    2011-06-01

    This guide presents the key criteria required to create accurate heating and cooling load calculations and offers examples of the implications when inaccurate adjustments are applied to the HVAC design process. The guide shows, through realistic examples, how various defaults and arbitrary safety factors can lead to significant increases in the load estimate. Emphasis is placed on the risks incurred from inaccurate adjustments or ignoring critical inputs of the load calculation.

  1. Strategy Guideline: Accurate Heating and Cooling Load Calculations

    SciTech Connect (OSTI)

    Burdick, A.

    2011-06-01

    This guide presents the key criteria required to create accurate heating and cooling load calculations and offers examples of the implications when inaccurate adjustments are applied to the HVAC design process. The guide shows, through realistic examples, how various defaults and arbitrary safety factors can lead to significant increases in the load estimate. Emphasis is placed on the risks incurred from inaccurate adjustments or ignoring critical inputs of the load calculation.

  2. DOE Publishes Final Rule for Television Test Procedure | Department...

    Broader source: Energy.gov (indexed) [DOE]

    DOE Publishes Final Rule for Plumbing Products Test Procedures DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure...

  3. PUCT - Procedure for Certifying Renewable Energy Credit Generators...

    Open Energy Info (EERE)

    link for PUCT - Procedure for Certifying Renewable Energy Credit Generators Citation Public Utility Commission of Texas. Form: PUCT - Procedure for Certifying Renewable Energy...

  4. ISSUANCE 2015-12-18: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    12-18: Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Final Rule ISSUANCE 2015-12-18: Energy Conservation Program: Test Procedures for ...

  5. ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures...

    Energy Savers [EERE]

    Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures for ...

  6. CLOSEOUT PROCEDURES FOR RECOVERY ACT GRANTS UNDER THE WEATHERIZATION...

    Office of Environmental Management (EM)

    CLOSEOUT PROCEDURES FOR RECOVERY ACT GRANTS UNDER THE WEATHERIZATION ASSISTANCE PROGRAM CLOSEOUT PROCEDURES FOR RECOVERY ACT GRANTS UNDER THE WEATHERIZATION ASSISTANCE PROGRAM This...

  7. Unified Procedures Applicable to Major Federal Actions Relating...

    Broader source: Energy.gov (indexed) [DOE]

    unified procedures issued by the State Department are established to satisfy the requirement of the Executive Order for implementing procedures concerning nuclear export activities...

  8. Procedures for Interagency Consultation to Avoid or Mitigate...

    Office of Environmental Management (EM)

    Procedures for Interagency Consultation to Avoid or Mitigate Adverse Effects on Rivers in the Nationwide Inventory Procedures for Interagency Consultation to Avoid or Mitigate...

  9. RCW 34.05 Administrative Procedure Act | Open Energy Information

    Open Energy Info (EERE)

    34.05 Administrative Procedure ActLegal Abstract Washington statute governing the procedures for agency action, including filing petitions for reconsideration of agency actions....

  10. Ex Parte Communication on Central Air-Conditioner Test Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    Energy (DOE) to discuss proposed amended test procedures for central air conditioners ... Ex Parte Communication on Central Air-Conditioner Test Procedure Ex Parte Memo on CACDry ...

  11. ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for Ceiling Fans, ...

  12. ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure...

    Energy Savers [EERE]

    Program: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines, Final Rule ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure for ...

  13. 2014-10-14 Issuance: Test Procedures Correction for Fluorescent...

    Energy Savers [EERE]

    14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; ...

  14. ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    6: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule This ...

  15. ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures for Commercial ...

  16. ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ...

  17. ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, ...

  18. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures...

    Energy Savers [EERE]

    Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Battery Chargers, ...

  19. 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration...

    Office of Environmental Management (EM)

    0 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule This document ...

  20. 2014-04-11 Issuance: Test Procedures for Residential Clothes...

    Office of Environmental Management (EM)

    1 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed ...

  1. 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration...

    Office of Environmental Management (EM)

    1-26 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration ...

  2. 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled...

    Energy Savers [EERE]

    Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting 2014-08-01 Issuance: Test Procedure for Refrigerated ...

  3. Meeting Concerning Potential Test Procedures and Energy Conservation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment Meeting Concerning Potential Test Procedures and Energy Conservation ...

  4. AVTA: Urban Electric Vehicle Specifications and Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Urban Electric Vehicle Specifications and Test Procedures AVTA: Urban Electric Vehicle Specifications and Test Procedures PDF icon UEVAmerica Specifications PDF icon ETA-UTP001 ...

  5. ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures...

    Energy Savers [EERE]

    18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final ...

  6. ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Energy Conservation Program: Test Procedures for Certain Categories of General Service ... Proposed Rulemaking 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting ...

  7. Energy Conservation Program: Test Procedure for Pumps, Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedure for Pumps, Notice of Proposed Rulemaking Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking This document is Energy Conservation ...

  8. AVTA: Full-Size Electric Vehicle Specifications and Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Full-Size Electric Vehicle Specifications and Test Procedures AVTA: Full-Size Electric Vehicle Specifications and Test Procedures PDF icon EV America Test Specifications PDF icon ...

  9. ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures...

    Energy Savers [EERE]

    Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures ...

  10. Policy and Procedures for the Review of Federal Actions Impacting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy and Procedures for the Review of Federal Actions Impacting the Environment Policy and Procedures for the Review of Federal Actions Impacting the Environment This manual...

  11. Green Lease Policies and Procedures for Lease Acquisition | Department...

    Energy Savers [EERE]

    Green Lease Policies and Procedures for Lease Acquisition Green Lease Policies and Procedures for Lease Acquisition PDF icon RSL-2007-12 More Documents & Publications Attachment 1:...

  12. Attachment 1: Green Lease Policies and Procedures for Lease Acquisitio...

    Energy Savers [EERE]

    Attachment 1: Green Lease Policies and Procedures for Lease Acquisition Attachment 1: Green Lease Policies and Procedures for Lease Acquisition PDF icon Green Lease Policies and...

  13. Effect of Machining Procedures on the Strength of Ceramics for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Machining Procedures on the Strength of Ceramics for Advanced Diesel Engine Applications Effect of Machining Procedures on the Strength of Ceramics for Advanced Diesel Engine...

  14. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation...

    Broader source: Energy.gov (indexed) [DOE]

    issued a pre-publication Federal Register final rule regarding test procedures for electric motors. For more information, please visit the rulemaking page. Test Procedure: All...

  15. 23 CFR 630 - Preconstruction Procedures | Open Energy Information

    Open Energy Info (EERE)

    23 CFR 630 - Preconstruction ProceduresLegal Abstract This section sets forth the procedures relating to the preparation, submission and approval of plans for...

  16. Oregon Rules of Appellate Procedure | Open Energy Information

    Open Energy Info (EERE)

    RegulationRegulation: Oregon Rules of Appellate ProcedureLegal Abstract These rules set forth the procedure for hearings before the state courts of appeals. Published NA Year...

  17. Attachment 1: Green Lease Policies and Procedures for Lease Acquisitio...

    Broader source: Energy.gov (indexed) [DOE]

    Green Lease Policies and Procedures for Lease Acquisition More Documents & Publications Green Lease Policies and Procedures for Lease Acquisition Attachment 2: Solicitation for ...

  18. Load drop evaluation for TWRS FSAR

    SciTech Connect (OSTI)

    Julyk, L.J.; Ralston, G.L.

    1996-09-30

    Operational or remediation activities associated with existing underground high-level waste storage tank structures at the Hanford Site often require the installation/removal of various equipment items. To gain tank access for installation or removal of this equipment, large concrete cover blocks must be removed and reinstalled in existing concrete pits above the tanks. An accidental drop of the equipment or cover blocks while being moved over the tanks that results in the release of contaminants to the air poses a potential risk to onsite workers or to the offsite public. To minimize this potential risk, the use of critical lift hoisting and rigging procedures and restrictions on lift height are being considered during development of the new tank farm Basis for Interim Operation and Final Safety Analysis Report. The analysis contained herein provides information for selecting the appropriate lift height restrictions for these activities.

  19. Repository Reference Disposal Concepts and Thermal Load Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    These help inform development of waste management strategies and decision making. PDF icon RepositoryReferenceDisposalConceptsThermalLoadManagementAnalysis More Documents & ...

  20. Load Expansion with Diesel/Gasoline RCCI for Improved Engine...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    with DieselGasoline RCCI for Improved Engine Efficiency and Emissions Load Expansion with DieselGasoline RCCI for Improved Engine Efficiency and Emissions This poster will...

  1. Montana Total Maximum Daily Load Development Projects Wiki |...

    Open Energy Info (EERE)

    Wiki Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana Total Maximum Daily Load Development Projects Wiki Abstract Provides information on...

  2. scriptEnv - loading modules before starting a script

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scriptEnv - loading modules before starting a script scriptEnv - loading modules before starting a script In some cases a script needs to load modules before the script can be executed, but it can often be inconvenient or impossible to provide wrapper scripts which load the needed modules. CGI scripts on the gpweb resources or in the NERSC portal environment which require the genepool-specific python/perl/R or databases configuration modules are a strong example of this. NERSC provides the

  3. DOE Workshop. Load Participation in Capacity and Ancillary Services Market

    SciTech Connect (OSTI)

    Boston, Terry

    2011-10-26

    Presents profile of PJM demand-side resources. PJM provides 24% of generation, 27% of load, and 19% of transmission assets in Eastern Interconnection. Includes case studies.

  4. Development of a Stiffness-Based Chemistry Load Balancing Scheme...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of a Stiffness-Based Chemistry Load Balancing Scheme, and Optimization of IO and Communication, to Enable Massively Parallel High-Fidelity Internal Combustion Engine Simulations...

  5. HVAC Loads in High-Performance Homes (Presentation)

    SciTech Connect (OSTI)

    Christensen, D.; Fang, X.; Winkler, J.

    2010-06-27

    This presentation was delivered at the ASHRAE 2010 Annual Summer Conference on June 27, 2010, and addresses humidity and AC loads in energy efficient houses.

  6. Used Nuclear Fuel Loading and Structural Performance Under Normal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and ancillary components under rail-related NCT loading, and effects on subsequent geometry, criticality, and retrievability . PDF icon UNFLoadingStructuralPerformanceUnderNorma...

  7. Comverge contribution to load participation of ancillary services

    SciTech Connect (OSTI)

    Miyaji, Wendell

    2011-10-25

    Presents Comverge demand response program summary. Discusses advantages of residential aggregation and real-time load management. Compares residential and commercial.

  8. Renewable Energy Load Matching Software - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Analysis Energy Analysis Find More Like This Return to Search Renewable Energy Load Matching Software National Renewable Energy Laboratory Contact NREL About This...

  9. Beam Loading by Distributed Injection of Electrons in a Plasma...

    Office of Scientific and Technical Information (OSTI)

    by Distributed Injection of Electrons in a Plasma Wakefield Accelerator Citation Details In-Document Search Title: Beam Loading by Distributed Injection of Electrons in a ...

  10. CBEI: Virtual Refrigerant Charge Sensing and Load Metering -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Virtual Refrigerant Charge Sensing and Load Metering - 2015 Peer Review Presenter: James Braun, Purdue University View the Presentation PDF icon CBEI: Virtual Refrigerant...

  11. ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected...

    U.S. Energy Information Administration (EIA) Indexed Site

    b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2007 and Projected 2008 through 2012 " ,"(Megawatts and 2007 ...

  12. ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected...

    U.S. Energy Information Administration (EIA) Indexed Site

    b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2006 and Projected 2007 through 2011 " ,"(Megawatts and 2006 ...

  13. Analysis and Representation of Miscellaneous Electric Loads in...

    U.S. Energy Information Administration (EIA) Indexed Site

    Miscellaneous Electric Loads (MELs) comprise a growing portion of delivered energy ... Miscellaneous end uses, including televisions, personal computers, security systems, data ...

  14. SE Idaho Load Service Update - June 10, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SE-Idaho-Load-Service-Update---June-10,-2015 Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

  15. Aggregated Modeling and Control of Air Conditioning Loads for...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Aggregated Modeling and Control of Air Conditioning Loads for Demand Response Citation Details In-Document Search Title: Aggregated Modeling and Control of Air...

  16. Load Expansion of Stoichiometric HCCI Using Spark Assist and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Stoichiometric HCCI Using Spark Assist and Hydraulic Valve Actuation Load Expansion of Stoichiometric HCCI Using Spark Assist and Hydraulic Valve Actuation Presentation given at...

  17. NUCLEAR REACTORS; PIPES; SEISMIC EFFECTS; SUPPORTS; DYNAMIC LOADS...

    Office of Scientific and Technical Information (OSTI)

    Limit analysis of pipe clamps Flanders, H.E. Jr. 22 GENERAL STUDIES OF NUCLEAR REACTORS; PIPES; SEISMIC EFFECTS; SUPPORTS; DYNAMIC LOADS; HEAT TRANSFER; HYDRAULICS; REACTOR SAFETY;...

  18. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...

    U.S. Energy Information Administration (EIA) Indexed Site

    2011" ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2009 and Projected 2010 through 2014 "...

  19. ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern...

    U.S. Energy Information Administration (EIA) Indexed Site

    f. Historical Noncoincident Winter Peak Load, Actual by North American Electric Reliability Corporation Region, 2005 through 2010 " ,"(Megawatts)" ,"Winter Noncoincident Peak...

  20. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...

    U.S. Energy Information Administration (EIA) Indexed Site

    a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2007 and Projected 2008 through 2012 " ,"(Megawatts and 2007...

  1. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...

    U.S. Energy Information Administration (EIA) Indexed Site

    2010" ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2008 and Projected 2009 through 2013 "...

  2. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...

    U.S. Energy Information Administration (EIA) Indexed Site

    4 and Projected 2005 through 2009 " ,"(Megawatts and 2004 Base Year)",,,," " ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,"Texas Power...

  3. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...

    U.S. Energy Information Administration (EIA) Indexed Site

    3 and Projected 2004 through 2008 " ,"(Megawatts and 2003 Base Year)",,,," " ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,"Texas Power...

  4. ,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...

    U.S. Energy Information Administration (EIA) Indexed Site

    a. Noncoincident Summer Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2006 and Projected 2007 through 2011 " ,"(Megawatts and 2006...

  5. net_energy_load_1990_2004.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    for this table format Table 1a . Historical Net Energy For Load, Actual by North American Electric Reliability Council Region, 1990 through 2004. (Thousands of Megawatthours)...

  6. ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected...

    U.S. Energy Information Administration (EIA) Indexed Site

    2007" ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Council Region, " ,"2005 and Projected 2006 through 2010 "...

  7. ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected...

    U.S. Energy Information Administration (EIA) Indexed Site

    2b. Noncoincident Winter Peak Load, Actual and Projected by North American Electric Reliability Corporation Region, " ,"2009 and Projected 2010 through 2014 " ,"(Megawatts and 2009...

  8. Lithium Loaded Glass Fiber Neutron Detector Tests

    SciTech Connect (OSTI)

    Ely, James H.; Erikson, Luke E.; Kouzes, Richard T.; Lintereur, Azaree T.; Stromswold, David C.

    2009-11-12

    Radiation portal monitors used for interdiction of illicit materials at borders include highly sensitive neutron detection systems. The main reason for having neutron detection capability is to detect fission neutrons from plutonium. The currently deployed radiation portal monitors (RPMs) from Ludlum and Science Applications International Corporation (SAIC) use neutron detectors based upon 3He-filled gas proportional counters, which are the most common large neutron detector. There is a declining supply of 3He in the world and, thus, methods to reduce the use of this gas in RPMs with minimal changes to the current system designs and sensitivity to cargo-borne neutrons are being investigated. Four technologies have been identified as being currently commercially available, potential alternative neutron detectors to replace the use of 3He in RPMs. Reported here are the results of tests of the lithium-loaded glass fibers option. This testing measured the neutron detection efficiency and gamma ray rejection capabilities of a small system manufactured by Nucsafe (Oak Ridge, TN).

  9. How loads affect coiled tubing life

    SciTech Connect (OSTI)

    Walker, E.J. Inc., AK )

    1992-01-01

    Fatigue testing was performed on 1-3/4-in OD, 0.125 in. wall thickness (WT) coiled tubing using a standard coiled tubing unit (CTU) as shown in this paper. Testing was conducted under Prudhoe Bay, Alaska oil well, conditions to determine the effects of axial load, internal pressure and bending stress on the longevity, or usable running footage, that can be expected with larger diameter tubing. The CTU was rigged up in a standard configuration with injector head 50 ft off the ground, the worst case for bending on most currently available North Slope units. Internal pressure was supplied by a small triplex pump and the end of tubing was closed off with a fishing neck and bull plug. Weight, for the first four tests, was suspended from the coiled tubing by a special clamp. The tubing was cycled up and over the guide arch until a loss of internal coiled tubing pressure (CTP) occurred, or until the tubing became stuck in the stripper brass.

  10. Standardized Procedure Content And Data Structure Based On Human Factors Requirements For Computer-Based Procedures

    SciTech Connect (OSTI)

    Bly, Aaron; Oxstrand, Johanna; Le Blanc, Katya L

    2015-02-01

    Most activities that involve human interaction with systems in a nuclear power plant are guided by procedures. Traditionally, the use of procedures has been a paper-based process that supports safe operation of the nuclear power industry. However, the nuclear industry is constantly trying to find ways to decrease the human error rate, especially the human errors associated with procedure use. Advances in digital technology make computer-based procedures (CBPs) a valid option that provides further enhancement of safety by improving human performance related to procedure use. The transition from paper-based procedures (PBPs) to CBPs creates a need for a computer-based procedure system (CBPS). A CBPS needs to have the ability to perform logical operations in order to adjust to the inputs received from either users or real time data from plant status databases. Without the ability for logical operations the procedure is just an electronic copy of the paper-based procedure. In order to provide the CBPS with the information it needs to display the procedure steps to the user, special care is needed in the format used to deliver all data and instructions to create the steps. The procedure should be broken down into basic elements and formatted in a standard method for the CBPS. One way to build the underlying data architecture is to use an Extensible Markup Language (XML) schema, which utilizes basic elements to build each step in the smart procedure. The attributes of each step will determine the type of functionality that the system will generate for that step. The CBPS will provide the context for the step to deliver referential information, request a decision, or accept input from the user. The XML schema needs to provide all data necessary for the system to accurately perform each step without the need for the procedure writer to reprogram the CBPS. The research team at the Idaho National Laboratory has developed a prototype CBPS for field workers as well as the underlying data structure for such CBPS. The objective of the research effort is to develop guidance on how to design both the user interface and the underlying schema. This paper will describe the result and insights gained from the research activities conducted to date.

  11. Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Huang, Zhenyu; Etingov, Pavel V.; Ma, Jian; Guttromson, Ross T.; Subbarao, Krishnappa; Chakrabarti, Bhujanga B.

    2010-01-01

    The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the flying brick technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

  12. Nondestructive assay (NDA) techniques and procedures

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    Report No. 4 is precursory to Report No. 5 {open_quotes}Determination of the Quantity and Locations of the Pu Currently Retained in the Cimarron Fuel Plant Systems{close_quotes} which will be presented upon completion of the decontamination of the Cimarron Plutonium Fuel Fabrication Facility. This report presents the Non-Destructive Assay (NDA) procedures which were developed and used by Sequoyah Fuels Corporation (successor to Kerr-McGee Nuclear Corporation) to measure equipment hold-up of plutonium materials for inventory purposes during operation of the plant. These procedures are also used to measure plutonium contamination on the equipment removed from the Material Balance Areas (MBA`s) during final decontamination. Report No. 5 will compare the measurements taken during this final decontamination period to previous inventory hold-up measurements, the date will be statistically analyzed, and a long-term assessment of the performance of the NDA equipment will be described.

  13. Procedure to Measure Indoor Lighting Energy Performance

    SciTech Connect (OSTI)

    Deru, M.; Blair, N.; Torcellini, P.

    2005-10-01

    This document provides standard definitions of performance metrics and methods to determine them for the energy performance of building interior lighting systems. It can be used for existing buildings and for proposed buildings. The primary users for whom these documents are intended are building energy analysts and technicians who design, install, and operate data acquisition systems, and who analyze and report building energy performance data. Typical results from the use of this procedure are the monthly and annual energy used for lighting, energy savings from occupancy or daylighting controls, and the percent of the total building energy use that is used by the lighting system. The document is not specifically intended for retrofit applications. However, it does complement Measurement and Verification protocols that do not provide detailed performance metrics or measurement procedures.

  14. Overview of High Power Vacuum Dry RF Load Designs

    SciTech Connect (OSTI)

    Krasnykh, Anatoly

    2015-08-27

    A specific feature of RF linacs based on the pulsed traveling wave (TW) mode of operation is that only a portion of the RF energy is used for the beam acceleration. The residual RF energy has to be terminated into an RF load. Higher accelerating gradients require higher RF sources and RF loads, which can stably terminate the residual RF power. RF feeders (from the RF source though the accelerating section to the load) are vacuumed to transmit multi-megawatt high power RF. This overview will outline vacuumed RF loads only. A common method to terminate multi-MW RF power is to use circulated water (or other liquid) as an absorbing medium. A solid dielectric interface (a high quality ceramic) is required to separate vacuum and liquid RF absorber mediums. Using such RF load approaches in TW linacs is troubling because there is a fragile ceramic window barrier and a failure could become catastrophic for linac vacuum and RF systems. Traditional loads comprising of a ceramic disk have limited peak and average power handling capability and are therefore not suitable for high gradient TW linacs. This overview will focus on ''vacuum dry'' or ''all-metal'' loads that do not employ any dielectric interface between vacuum and absorber. The first prototype is an original design of RF loads for the Stanford Two-Mile Accelerator.

  15. Cone Penetrometer Load Cell Temperature and Radiation Testing Results

    SciTech Connect (OSTI)

    Follett, Jordan R.

    2013-08-28

    This report summarizes testing activities performed at the Pacific Northwest National Laboratory to verify the cone penetrometer load cell can withstand the tank conditions present in 241-AN-101 and 241-AN-106. The tests demonstrated the load cell device will operate under the elevated temperature and radiation levels expected to be encountered during tank farm deployment of the device.

  16. Proposal Submittal and Scheduling Procedures Entry Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Submittal and Scheduling Procedures for Research at SSRL X-ray/VUV Macromolecular Crystallography SSRL is funded by the Department of Energy, Office of Basic Energy Sciences under contract DE-AC03-76SF00515. The SSRL Structural Molecular Biology Program is supported by the Department of Energy, Office of Biological and Environmental Research, the National Institutes of Health, National Center for Research Resources, Biomedical Technology Program, and the National Institute of General

  17. Mentoring Policies and Procedures | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mentoring Policies and Procedures The Postdoctoral Mentoring Program follows a structured-facilitated design. This is a relatively formal program with support from the Laboratory. In most cases, postdocs will select their own mentors after they have had the chance to review staff bios and meet with potential mentors. However, in divisions with a large number of postdocs, it may become necessary for the division to facilitate mentor-mentee pairings. This approach should only be taken with the

  18. Microsoft Word - RM Procedures.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Records Management Procedures for Storage, Transfer and Retrieval of Records from WNRC RETIREMENT OF RECORDS 1. The Program Office is responsible for originating the Records Transmittal and Receipt Form (SF-135), and sending them to IM-23 for approval. 2. IM-23 reviews the SF-135 for completeness/correctness (Coordinates with the originating office by email if more information is required.). 3. IM-23 sends the SF-135 for approval to WNRC. PREPARING RECORDS FOR THE TRANSFER TO THE WNRC 1. Use

  19. Microsoft Word - Records Management Exit Procedures

    Office of Environmental Management (EM)

    Records Management Exit Procedures For Departing Department of Energy Federal and Contractor Employees Records Management Division Office of IT Planning, Architecture, and E-Government Office of the Chief Information Officer July 2010 2 PRESERVATION OF FEDERAL RECORDS The Federal Records Act requires the Department of Energy (DOE) Records Officer to remind departing Federal and contractor employees that Federal records may not be removed from Government custody nor may they be destroyed except

  20. Quality Procedure - Personnel Training and Qualification | Department of

    Energy Savers [EERE]

    Energy Personnel Training and Qualification Quality Procedure - Personnel Training and Qualification This procedure establishes the requirements for the training and qualification of personnel in the Office of Standards and Quality Assurance, and ensures that office personnel are properly trained and qualified to correctly perform their assigned tasks. PDF icon Quality Procedure - Personnel Training and Qualification More Documents & Publications Quality Procedure - Supplier

  1. Attachment 1: Green Lease Policies and Procedures for Lease Acquisition |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: Green Lease Policies and Procedures for Lease Acquisition Attachment 1: Green Lease Policies and Procedures for Lease Acquisition PDF icon Green Lease Policies and Procedures for Lease Acquisition More Documents & Publications Green Lease Policies and Procedures for Lease Acquisition Attachment 2: Solicitation for Offers with New and Revised Green Lease Text Attachment 4: Unrevised SFO Paragraphs Reissued

  2. Hydropower licensing: a case study of Massachusetts' streamlined procedure

    SciTech Connect (OSTI)

    Gardiner, P.

    1980-08-01

    Licensing procedures for hydroelectric projects in Massachusetts are enumerated, reviewed, and evaluated. (LCL)

  3. Recovery Act. Advanced Load Identification and Management for Buildings

    SciTech Connect (OSTI)

    Yang, Yi; Casey, Patrick; Du, Liang; He, Dawei

    2014-02-12

    In response to the U.S. Department of Energy (DoE)’s goal of achieving market ready, net-zero energy residential and commercial buildings by 2020 and 2025, Eaton partnered with the Department of Energy’s National Renewable Energy Laboratory (NREL) and Georgia Institute of Technology to develop an intelligent load identification and management technology enabled by a novel “smart power strip” to provide critical intelligence and information to improve the capability and functionality of building load analysis and building power management systems. Buildings account for 41% of the energy consumption in the United States, significantly more than either transportation or industrial. Within the building sector, plug loads account for a significant portion of energy consumption. Plug load consumes 15-20% of building energy on average. As building managers implement aggressive energy conservation measures, the proportion of plug load energy can increase to as much as 50% of building energy leaving plug loads as the largest remaining single source of energy consumption. This project focused on addressing plug-in load control and management to further improve building energy efficiency accomplished through effective load identification. The execution of the project falls into the following three major aspects; An intelligent load modeling, identification and prediction technology was developed to automatically determine the type, energy consumption, power quality, operation status and performance status of plug-in loads, using electric waveforms at a power outlet level. This project demonstrated the effectiveness of the developed technology through a large set of plug-in loads measurements and testing; A novel “Smart Power Strip (SPS) / Receptacle” prototype was developed to act as a vehicle to demonstrate the feasibility of load identification technology as a low-cost, embedded solution; and Market environment for plug-in load control and management solutions, in particular, advanced power strips (APSs) was studied. The project evaluated the market potential for Smart Power Strips (SPSs) with load identification and the likely impact of a load identification feature on APS adoption and effectiveness. The project also identified other success factors required for widespread APS adoption and market acceptance. Even though the developed technology is applicable for both residential and commercial buildings, this project is focused on effective plug-in load control and management for commercial buildings, accomplished through effective load identification. The project has completed Smart Receptacle (SR) prototype development with integration of Load ID, Control/Management, WiFi communication, and Web Service. Twenty SR units were built, tested, and demonstrated in the Eaton lab; eight SR units were tested in the National Renewable Energy Lab (NREL) for one-month of field testing. Load ID algorithm testing for extended load sets was conducted within the Eaton facility and at local university campuses. This report is to summarize the major achievements, activities, and outcomes under the execution of the project.

  4. Predicting the Response of Electricity Load to Climate Change

    SciTech Connect (OSTI)

    Sullivan, Patrick; Colman, Jesse; Kalendra, Eric

    2015-07-28

    Our purpose is to develop a methodology to quantify the impact of climate change on electric loads in the United States. We perform simple linear regression, assisted by geospatial smoothing, on paired temperature and load time-series to estimate the heating- and coolinginduced sensitivity to temperature across 300 transmission zones and 16 seasonal and diurnal time periods. The estimated load sensitivities can be coupled with climate scenarios to quantify the potential impact of climate change on load, with a primary application being long-term electricity scenarios. The method allows regional and seasonal differences in climate and load response to be reflected in the electricity scenarios. While the immediate product of this analysis was designed to mesh with the spatial and temporal resolution of a specific electricity model to enable climate change scenarios and analysis with that model, we also propose that the process could be applied for other models and purposes.

  5. DOE EERE Standard Operating Procedure Peer Review Best Practice and Procedures

    Office of Environmental Management (EM)

    U.S. DEPARTMENT OF ENERGY OFFICE OF ENERGY EFFICIENCY AND RENEWABLE ENERGY (EERE) STANDARD OPERATING PROCEDURE (SOP) PEER REVIEW BEST PRACTICE AND PROCEDURES 1.0 PURPOSE 1.1 Purpose: Objective review and advice from peers - peer review - provides managers, staff, and researchers with a powerful and effective tool for enhancing the management, relevance, effectiveness, and productivity of all of the EERE research, development, demonstration, deployment (RD 3 ), and supporting business management

  6. Proposed Procedures for Liquefied Natural Gas Export Decisions | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Proposed Procedures for Liquefied Natural Gas Export Decisions Proposed Procedures for Liquefied Natural Gas Export Decisions On August 15, 2014, the Department of Energy's (DOE) Office of Fossil Energy announced its Procedures for Liquefied Natural Gas Export Decisions (Procedures). Pursuant to these Procedures, DOE will act on applications to export liquefied natural gas (LNG) from the lower-48 states to non-FTA countries only after the review required by the National

  7. DOE Issues Final Appliance Test Procedure Rule | Department of Energy

    Energy Savers [EERE]

    Appliance Test Procedure Rule DOE Issues Final Appliance Test Procedure Rule December 8, 2006 - 9:46am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced a final rule establishing new test procedures and related definitions to determine the energy efficiency of certain residential appliances and commercial equipment. The rulemaking clarifies and codifies the test procedures mandated by the Energy Policy Act (EPAct) of 2005. "These new test procedures are the

  8. Quality Procedure - Memo/Correspondence Control and Tracking | Department

    Energy Savers [EERE]

    of Energy Memo/Correspondence Control and Tracking Quality Procedure - Memo/Correspondence Control and Tracking This procedure establishes the responsibilities and process for issuing memoranda or correspondence originating within the Office of Standards and Quality Assurance to the Field and Headquarters offices. PDF icon Quality Procedure - Memo/Correspondence Control and Tracking More Documents & Publications Quality Procedure - Document Control Quality Procedure - Audits Quality

  9. Procedures for Public Release of Data | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures for Public Release of Data Procedures for Public Release of Data Procedures for Public Release of Data All Department of Energy (DOE) data owners should follow the procedures outlined below in preparing a data collection for public release. Legislative requirements, Office of Management and Budget (OMB) guidance, and DOE directives related to data quality and data control are referenced in the procedures steps. Step 1 Data owners and/or managers identify a data collection for possible

  10. Conduct of Engineering and Technical Support Procedure Manual | Department

    Office of Environmental Management (EM)

    of Energy Conduct of Engineering and Technical Support Procedure Manual Conduct of Engineering and Technical Support Procedure Manual This procedure defines a standard approach for the control of software and firmware that is not exempt per Manual 1Q, Procedure 20-1, Software Quality Assurance. The software functional classification is based on the intended use of the software and the impact of the results/output on safety, security, and business risk. The provisions of this procedure apply

  11. Mechanical Loads Test Report for the U.S. Department of Energy 1.5-Megawatt Wind Turbine

    SciTech Connect (OSTI)

    Santos, Rick; van Dam, Jeroen

    2015-07-16

    The objective of the test was to obtain a baseline characterization of the mechanical loads of the DOE 1.5 wind turbine located at NREL. The test was conducted in accordance with the International Electrotechnical Commission (IEC) Technical Specification, IEC 61400-13 Wind Turbine Generator Systems – Part 13: Measurement of mechanical loads; First Edition 2001-06 [1]. The National Wind Technology Center (NWTC) at NREL conducted this test in accordance with its quality system procedures so that the final test report meets the full requirements of its accreditation by the American Association for Laboratory Accreditation (A2LA). NREL’s quality system requires that all applicable requirements specified by A2LA and International Standards Organization/IEC 17025 be met or to note any exceptions in the test report.

  12. Multi-State Load Models for Distribution System Analysis

    SciTech Connect (OSTI)

    Schneider, Kevin P.; Fuller, Jason C.; Chassin, David P.

    2011-11-01

    Recent work in the field of distribution system analysis has shown that the traditional method of peak load analysis is not adequate for the analysis of emerging distribution system technologies. Voltage optimization, demand response, electric vehicle charging, and energy storage are examples of technologies with characteristics having daily, seasonal, and/or annual variations. In addition to the seasonal variations, emerging technologies such as demand response and plug in electric vehicle charging have the potential to send control signals to the end use loads which will affect how they consume energy. In order to support time-series analysis over different time frames and to incorporate potential control signal inputs it is necessary to develop detailed end use load models which accurately represent the load under various conditions, and not just during the peak load period. This paper will build on previous work on detail end use load modeling in order to outline the method of general multi-state load models for distribution system analysis.

  13. Experimental evaluation of rotary engine timing gear loads

    SciTech Connect (OSTI)

    Kulina, M.R.

    1986-01-01

    The function of the timing gear of a rotary engine is to control the angular velocity of the rotor in relation to that of the crankshaft. The only load on the gear consists of the friction load due to the rotor seals, the torsional motion of the rotor and any torque developed on the rotor caused by uneven pressure distribution across the rotor flank. In the design of the gear and attachments an estimate of the loads must be made. In the case of an aircraft engine, knowing the actual loads and designing accordingly would result in the most weight effective configuration. A specially instrumented stationary gear of a Deere 0.67 liter SCORE III rotary engine was used to measure the peak torque during test stand operation. The results of the test confirm that rotor friction and torsional motion (due to drive line dynamics) produce the prime gear load below 70% design speed. At the higher engine speeds, a sub-system resonance of the rotor contributes significantly to the total load on the gear. The results of this test, together with the results of three earlier tests conducted on stationary gears are used to establish a design guide. This design guide relates the stationary gear load to crankshaft mean torque and engine displacement.

  14. Seismic Loading for FAST: May 2011 - August 2011

    SciTech Connect (OSTI)

    Asareh, M. A.; Prowell, I.

    2012-08-01

    As more wind farms are constructed in seismically active regions, earthquake loading increases in prominence for design and analysis of wind turbines. Early investigation of seismic load tended to simplify the rotor and nacelle as a lumped mass on top of the turbine tower. This simplification allowed the use of techniques developed for conventional civil structures, such as buildings, to be easily applied to wind turbines. However, interest is shifting to more detailed models that consider loads for turbine components other than the tower. These improved models offer three key capabilities in consideration of base shaking for turbines: 1) The inclusion of aerodynamics and turbine control; 2) The ability to consider component loads other than just tower loads; and 3) An improved representation of turbine response in higher modes by reducing modeling simplifications. Both experimental and numerical investigations have shown that, especially for large modern turbines, it is important to consider interaction between earthquake input, aerodynamics, and operational loads. These investigations further show that consideration of higher mode activity may be necessary in the analysis of the seismic response of turbines. Since the FAST code is already capable of considering these factors, modifications were developed that allow simulation of base shaking. This approach allows consideration of this additional load source within a framework, the FAST code that is already familiar to many researchers and practitioners.

  15. Dynamic load measurement on an LPG carrier during voyage

    SciTech Connect (OSTI)

    Kamoi, Noriyuki; Taniguchi, Tomokazu; Kiso, Takashi; Kada, Kazuo; Motoi, Tatsuya; Nakamura, Shinichi

    1994-12-31

    There are few actual ship measurement data showing the propriety of the design loads given by classification societies rules or other relevant rules. Therefore, the authors measured acceleration of ship motion and fluctuating loads on tank supports and chocks of a 75,000 m{sup 3} LPG carrier during her voyage. This paper introduces the subject ship and typical measurement results over about 1.3 years. From the analysis of these data, the authors have made clear the amount of frequency of fluctuating loads during actual navigation and ascertained the propriety of the ship`s design base.

  16. Comparison of Different Load Road Implementation Strategies on Fuel Economy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of USPS Step Vans | Department of Energy Different Load Road Implementation Strategies on Fuel Economy of USPS Step Vans Comparison of Different Load Road Implementation Strategies on Fuel Economy of USPS Step Vans An alternative form of measuring road loads, instead of using a chassis dynamometer and a method described in 40 CFR section 86.1229-85, was conducted on on-road coastdowns, and regression analysis was used to determine the characteristics of the two U.S. Postal Service step vans,

  17. Commercial and Residential Hourly Load Data Question | OpenEI...

    Open Energy Info (EERE)

    Commercial and Residential Hourly Load Data Question Home Hi, I saw that you were actively replying to the questions on that page, so thought I'd contact you to ask about the data...

  18. Property:Geothermal/LoadFactor | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search This is a property of type Number. Pages using the property "GeothermalLoadFactor" Showing 25 pages using this property. (previous 25) (next 25) 4 4 UR...

  19. Design of dynamic load-balancing tools for parallel applications

    SciTech Connect (OSTI)

    Devine, K.D.; Hendrickson, B.A.; Boman, E.G.; St. John, M.; Vaughan, C.T.

    2000-01-03

    The design of general-purpose dynamic load-balancing tools for parallel applications is more challenging than the design of static partitioning tools. Both algorithmic and software engineering issues arise. The authors have addressed many of these issues in the design of the Zoltan dynamic load-balancing library. Zoltan has an object-oriented interface that makes it easy to use and provides separation between the application and the load-balancing algorithms. It contains a suite of dynamic load-balancing algorithms, including both geometric and graph-based algorithms. Its design makes it valuable both as a partitioning tool for a variety of applications and as a research test-bed for new algorithmic development. In this paper, the authors describe Zoltan's design and demonstrate its use in an unstructured-mesh finite element application.

  20. The Development of a Small Engine Based Accelerated Ash Loading...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Accelerated Ash Loading Protocol Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the U.S. DOE's EERE FreedomCar and Fuel Partnership and 21st...

  1. Review of Residential Low-Load HVAC Systems

    SciTech Connect (OSTI)

    Brown, Scott A.; Thornton, Brian; Widder, Sarah H.

    2013-09-01

    In support of the U.S. Department of Energys (DOEs) Building America Program, Pacific Northwest National Laboratory (PNNL) conducted an investigation to inventory commercially available HVAC technologies that are being installed in low-load homes. The first step in this investigation was to conduct a review of published literature to identify low-load HVAC technologies available in the United States and abroad, and document the findings of existing case studies that have evaluated the performance of the identified technologies. This report presents the findings of the literature review, identifies gaps in the literature or technical understanding that must be addressed before low-load HVAC technologies can be fully evaluated, and introduces PNNLs planned research and analysis for this project to address identified gaps and potential future work on residential low-load HVAC systems.

  2. Commercial and Residential Hourly Load Data Now Available on...

    Open Energy Info (EERE)

    Login to post comments Russmach32 Russmach321 year 8 weeks ago Validation of dataset Hello, in the description of this dataset it states that these load profiles are simulated....

  3. Energy efficiency indicators for high electric-load buildings

    SciTech Connect (OSTI)

    Aebischer, Bernard; Balmer, Markus A.; Kinney, Satkartar; Le Strat, Pascale; Shibata, Yoshiaki; Varone, Frederic

    2003-06-01

    Energy per unit of floor area is not an adequate indicator for energy efficiency in high electric-load buildings. For two activities, restaurants and computer centres, alternative indicators for energy efficiency are discussed.

  4. T-load microchannel array and fabrication method

    DOE Patents [OSTI]

    Swierkowski, Stefan P.

    2000-01-01

    A three-dimensional (3-D) T-load for planar microchannel arrays for electrophoresis, for example, which enables sample injection directly onto a plane perpendicular to the microchannels' axis, at their ends. This is accomplished by forming input wells that extend beyond the ends of the microchannel thereby eliminating the right angle connection from the input well into the end of the microchannel. In addition, the T-load input well eases the placement of electrode in or adjacent the well and thus enables very efficient reproducible electrokinetic (ek) injection. The T-load input well eliminates the prior input well/microchannel alignment concerns, since the input well can be drilled after the top and bottom microchannel plates are bonded together. The T-load input well may extend partially or entirely through the bottom microchannel plate which enables more efficient gel and solution flushing, and also enables placement of multiple electrodes to assist in the ek sample injection.

  5. Active Aerodynamic Blade Control Design for Load Alleviation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... The accurate evaluation of the impact of AALC fatigue load reductions on the Cost of Energy (COE) of a wind turbine will require a complete new turbine design that fully integrates ...

  6. Minimized Space Conditioning Distribution Strategy for Low-load Homes

    Broader source: Energy.gov [DOE]

    This presentation was given at the Summer 2012 DOE Building America meeting on July 26, 2012, and addressed the question What are the best HVAC solutions for low-load, high performance homes?"

  7. High-Resolution Residential Feeder Load Characterization and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    USA Abstract - Data from of a highly instrumented residential feeder in Ota City, Japan was used to determine 1 second load variability for the aggregation of 50, 100, 250,...

  8. ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected...

    U.S. Energy Information Administration (EIA) Indexed Site

    4 and Projected 2005 through 2009 " ,"(Megawatts and 2004 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,"Texas Power Grid","Western...

  9. ,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected...

    U.S. Energy Information Administration (EIA) Indexed Site

    3 and Projected 2004 through 2008 " ,"(Megawatts and 2003 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,"Texas Power Grid","Western...

  10. Summative Mass Analysis of Algal Biomass … Integration of Analytical Procedures; Laboratory Analytical Procedure (LAP) (Revised)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC36-08GO28308 Summative Mass Analysis of Algal Biomass - Integration of Analytical Procedures Laboratory Analytical Procedure (LAP) Issue Date: December 2, 2013 Revision Date: December 29, 2015 Lieve M.L. Laurens Technical Report NREL/TP-5100-60943 Revised December 2015 NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Operated by the Alliance for Sustainable Energy, LLC This report is available at no cost from the

  11. Addressing Plug and Process Loads | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    1, 2015 3:00PM to 4:00PM EST Presenters: Rois Langer, National Renewable Energy Laboratory (NREL); Moira Hafer, Stanford University; Jason Sielcken, U.S. General Services Administration (GSA) Plug and process loads become a larger piece of the building energy pie as the low hanging fruits of energy efficiency, such as lighting retrofits, are harvested. This webinar will include a discussion by NREL on simple low-cost and portable plug and process loads interventions. Stanford University will

  12. Adjustable Speed Drive Part-Load Efficiency | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Drive Part-Load Efficiency Adjustable Speed Drive Part-Load Efficiency An adjustable speed drive (ASD) is a device that controls the rotational speed of motor-driven equipment. Variable frequency drives (VFDs), the most common type of ASDs, efficiently meet varying process requirements by adjusting the frequency and voltage of the power supplied to an AC motor to enable it to operate over a wide speed range. External sensors monitor flow, liquid levels, or pressure and then transmit a signal to

  13. Method for loading shape memory polymer gripper mechanisms (Patent) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Method for loading shape memory polymer gripper mechanisms Citation Details In-Document Search Title: Method for loading shape memory polymer gripper mechanisms × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy science and technology. A paper copy of this

  14. Healthcare Energy: Spotlight on Lighting and Other Electric Loads |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Lighting and Other Electric Loads Healthcare Energy: Spotlight on Lighting and Other Electric Loads Compact fluorescent, light-emitting diode, and energy-saving incandescent light bulbs. | Image by Dennis Schroeder/NREL 19469 Compact fluorescent, light-emitting diode, and energy-saving incandescent light bulbs. | Image by Dennis Schroeder/NREL 19469 The Building Technologies Office conducted a healthcare energy end-use monitoring project in partnership with two

  15. LDRD final report : mesoscale modeling of dynamic loading of heterogeneous

    Office of Scientific and Technical Information (OSTI)

    materials. (Technical Report) | SciTech Connect LDRD final report : mesoscale modeling of dynamic loading of heterogeneous materials. Citation Details In-Document Search Title: LDRD final report : mesoscale modeling of dynamic loading of heterogeneous materials. × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize

  16. WIPP Mobile Loading Unit Contract - 8-27-12

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Awards Contract for WIPP Mobile Loading Unit Services Cincinnati, Ohio, August 27, 2012 - The U.S. Department of Energy (DOE) today awarded a competitive small business contract to Celeritex, LLC, (a Joint Venture between Project Services Group, LLC and DeNuke Contracting Services Inc.) of Suwanee, Georgia. The contract is to provide Mobile Loading Unit services in support of the National TRU Program and the DOE Carlsbad Field Office (CBFO) at the Waste Isolation Pilot Plant (WIPP) in New

  17. Carbon Monoxide Tolerant Electrocatalyst with Low Platinum Loading and a

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Process for its Preparation - Energy Innovation Portal Startup America Startup America Hydrogen and Fuel Cell Hydrogen and Fuel Cell Find More Like This Return to Search Carbon Monoxide Tolerant Electrocatalyst with Low Platinum Loading and a Process for its Preparation Brookhaven National Laboratory Contact BNL About This Technology Publications: PDF Document Publication Pt Submonolayers on Ru Nanoparticles: A Novel Low Pt Loading, High CO Tolerance Fuel Cell Electrocatalyst (173 KB)

  18. Load flow analysis: Base cases, data, diagrams, and results (Technical

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report) | SciTech Connect Load flow analysis: Base cases, data, diagrams, and results Citation Details In-Document Search Title: Load flow analysis: Base cases, data, diagrams, and results × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy science and technology. A paper

  19. Improved Lithium-Loaded Liquid Scintillators for Neutron Detection - Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Innovation Portal Improved Lithium-Loaded Liquid Scintillators for Neutron Detection Oak Ridge National Laboratory Contact ORNL About This Technology Technology Marketing Summary A liquid scintillator with a substantially increased lithium weight was developed by ORNL researchers. Scintillators are widely used for the detection of neutron radiation emitted by radioactive sources. Conventional liquid scintillators are loaded with neutron absorbers. However, these scintillators generally have

  20. High load operation in a homogeneous charge compression ignition engine

    DOE Patents [OSTI]

    Duffy, Kevin P. (Metamora, IL); Kieser, Andrew J. (Morton, IL); Liechty, Michael P. (Chillicothe, IL); Hardy, William L. (Peoria, IL); Rodman, Anthony (Chillicothe, IL); Hergart, Carl-Anders (Peoria, IL)

    2008-12-23

    A homogeneous charge compression ignition engine is set up by first identifying combinations of compression ratio and exhaust gas percentages for each speed and load across the engines operating range. These identified ratios and exhaust gas percentages can then be converted into geometric compression ratio controller settings and exhaust gas recirculation rate controller settings that are mapped against speed and load, and made available to the electronic

  1. Used Nuclear Fuel Loading and Structural Performance Under Normal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conditions of Transport - Modeling, Simulation and Experimental Integration RD&D Plan | Department of Energy Nuclear Fuel Loading and Structural Performance Under Normal Conditions of Transport - Modeling, Simulation and Experimental Integration RD&D Plan Used Nuclear Fuel Loading and Structural Performance Under Normal Conditions of Transport - Modeling, Simulation and Experimental Integration RD&D Plan Used nuclear fuel (UNF) must maintain its integrity during the storage

  2. Repository Reference Disposal Concepts and Thermal Load Management Analysis

    Energy Savers [EERE]

    | Department of Energy Repository Reference Disposal Concepts and Thermal Load Management Analysis Repository Reference Disposal Concepts and Thermal Load Management Analysis A disposal concept consists of three parts: waste inventory (7 waste types examined), geologic setting (e.g., clay/shale, salt, crystalline, other sedimentary), and the engineering concept of operations (range of generic operational concepts examined). Two major categories for waste package emplacement modes are

  3. SEP Success Story: Warding Off Energy Vampires and Phantom Loads |

    Energy Savers [EERE]

    Department of Energy SEP Success Story: Warding Off Energy Vampires and Phantom Loads SEP Success Story: Warding Off Energy Vampires and Phantom Loads October 1, 2013 - 9:46am Addthis This Halloween, keep energy vampires at bay -- while saving energy and money -- with these home energy efficiency tricks. | Infographic by Sarah Gerrity, Energy Department This Halloween, keep energy vampires at bay -- while saving energy and money -- with these home energy efficiency tricks. | Infographic by

  4. Warding Off Energy Vampires and Phantom Loads | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Warding Off Energy Vampires and Phantom Loads Warding Off Energy Vampires and Phantom Loads October 31, 2013 - 1:45pm Addthis This Halloween, keep energy vampires at bay -- while saving energy and money -- with these home energy efficiency tricks. | Infographic by Sarah Gerrity, Energy Department This Halloween, keep energy vampires at bay -- while saving energy and money -- with these home energy efficiency tricks. | Infographic by Sarah Gerrity, Energy Department Amy Royden-Bloom State Energy

  5. EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.; Mitchell, E.

    2011-01-18

    The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

  6. Model Development and Loads Analysis of an Offshore Wind Turbine on a Tension Leg Platform with a Comparison to Other Floating Turbine Concepts: April 2009

    SciTech Connect (OSTI)

    Matha, D.

    2010-02-01

    This report presents results of the analysis of a 5-MW wind turbine located on a floating offshore tension leg platform (TLP) that was conducted using the fully coupled time-domain aero-hydro-servo-elastic design code FAST with AeroDyn and HydroDyn. The report also provides a description of the development process of the TLP model. The model has been verified via comparisons to frequency-domain calculations. Important differences have been identified between the frequency-domain and time-domain simulations, and have generated implications for the conceptual design process. An extensive loads and stability analysis for ultimate and fatigue loads according to the procedure of the IEC 61400-3 offshore wind turbine design standard was performed with the verified TLP model. This report compares the loads for the wind turbine on the TLP to those of an equivalent land-based turbine. Major instabilities for the TLP are identified and described.

  7. Selecting a Control Strategy for Plug and Process Loads

    SciTech Connect (OSTI)

    Lobato, C.; Sheppy, M.; Brackney, L.; Pless, S.; Torcellini, P.

    2012-09-01

    Plug and Process Loads (PPLs) are building loads that are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the building occupants. PPLs in commercial buildings account for almost 5% of U.S. primary energy consumption. On an individual building level, they account for approximately 25% of the total electrical load in a minimally code-compliant commercial building, and can exceed 50% in an ultra-high efficiency building such as the National Renewable Energy Laboratory's (NREL) Research Support Facility (RSF) (Lobato et al. 2010). Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. A complex array of technologies that measure and manage PPLs has emerged in the marketplace. Some fall short of manufacturer performance claims, however. NREL has been actively engaged in developing an evaluation and selection process for PPLs control, and is using this process to evaluate a range of technologies for active PPLs management that will cap RSF plug loads. Using a control strategy to match plug load use to users' required job functions is a huge untapped potential for energy savings.

  8. Transportation Electrification Load Development For A Renewable Future Analysis: Preprint

    SciTech Connect (OSTI)

    Markel, T.; Mai, T.; Kintner-Meyer, M.

    2010-12-01

    The transition to electricity as a transportation fuel will create a new load for electricity generation. A set of regional hourly load profiles for electrified vehicles was developed for the 2010 to 2050 timeframe. The transportation electrical energy was determined using regional population forecast data, historical vehicle per capita data, and market penetration growth functions to determine the number of plug-in electric vehicles (PEVs) in each analysis region. Market saturation scenarios of 30% and 50% of sales of PEVs consuming on average approx. 6 kWh per day were considered. PEV aggregate load profiles from previous work were combined with vehicle population data to generate hourly loads on a regional basis. A transition from consumer-controlled charging toward utility-controlled charging was assumed such that by 2050 approximately 45% of the transportation energy demands could be delivered across four daily time slices under optimal control from the utility?s perspective. This electrified transportation analysis resulted in an estimate for both the flexible load and fixed load shapes on a regional basis that may evolve under two PEV market penetration scenarios.

  9. Texas - PUC Substantive Rule 22 - Procedural Rules | Open Energy...

    Open Energy Info (EERE)

    Procedural RulesLegal Abstract The purpose of this chapter is to provide a system of procedures for practice before the Public Utilities Commission of Texas. Published NA Year...

  10. OAR 340-106 - DEQ Permitting Procedures | Open Energy Information

    Open Energy Info (EERE)

    6 - DEQ Permitting Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: OAR 340-106 - DEQ Permitting ProceduresLegal...

  11. UC 63G-4 - Administrative Procedures Act | Open Energy Information

    Open Energy Info (EERE)

    63G-4 - Administrative Procedures Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: UC 63G-4 - Administrative Procedures...

  12. MCA 46-4 - Investigative Procedures | Open Energy Information

    Open Energy Info (EERE)

    46-4 - Investigative Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: MCA 46-4 - Investigative ProceduresLegal...

  13. File:Application procedures.pdf | Open Energy Information

    Open Energy Info (EERE)

    Application procedures.pdf Jump to: navigation, search File File history File usage File:Application procedures.pdf Size of this preview: 463 599 pixels. Other resolution: 464...

  14. Title 40 CFR 124 Procedures for Decisionmaking | Open Energy...

    Open Energy Info (EERE)

    4 Procedures for Decisionmaking Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR 124 Procedures...

  15. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure...

    Energy Savers [EERE]

    Final Rule for Residential Furnace Fan Test Procedure DOE Publishes Final Rule for Residential Furnace Fan Test Procedure January 3, 2014 - 12:00am Addthis The Department of Energy ...

  16. Utah Rules of Appellate Procedure | Open Energy Information

    Open Energy Info (EERE)

    of Appellate Procedure Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Utah Rules of Appellate ProcedureLegal Abstract...

  17. CRAD, Verification and Validation of Facilities Procedures Assessment Plan

    Broader source: Energy.gov [DOE]

    The purpose of this assessment is verify and validate the process for the development of operations procedures and that procedures are in place which provide direction to personnel to ensure that the facility is operated within its design bases.

  18. J1634 SAE BEV Test Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    J1634 SAE BEV Test Procedures J1634 SAE BEV Test Procedures 2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 --...

  19. DOE Launches Public Test Procedure Guidance Website | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Public Test Procedure Guidance Website DOE Launches Public Test Procedure Guidance Website July 22, 2010 - 4:14pm Addthis The Department of Energy this week launched a new online...

  20. CRAD, System Operating Test Procedures - October 23, 2014 (EA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) CRAD, System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) October 23, 2014...

  1. Wyoming Rules of Civil Procedure | Open Energy Information

    Open Energy Info (EERE)

    Rules of Civil Procedure Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Wyoming Rules of Civil ProcedureLegal Abstract...

  2. Nevada Rules of Civil Procedure | Open Energy Information

    Open Energy Info (EERE)

    Civil Procedure Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Nevada Rules of Civil ProcedureLegal Abstract These rules...

  3. Idaho Rules of Civil Procedure | Open Energy Information

    Open Energy Info (EERE)

    Rules of Civil Procedure Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Idaho Rules of Civil ProcedureLegal Published NA...

  4. Guideline for the preparation of safe operating procedures

    SciTech Connect (OSTI)

    Stinnett, L.; Carroll, M.M.; Crooks, D.L.; Doyle, J.R.; Jeblick, H.G.; Kessel, D.S.; Tippy, M.W.; Stuckey, J.M.

    1981-03-01

    These procedures are written for activities that involve the use of explosives, dangerous chemicals, radioactive materials, hazardous sytems, and for certain types of operational facilities which present hazards. This guideline presents a suggested Safe Operating Procedures format.

  5. EVMS Surveillance Standard Operating Procedure (ESSOP)

    Broader source: Energy.gov [DOE]

    This EVMS Surveillance Standard Operating Procedure (ESSOP) serves as a primary reference for OAPM MA-63 when conducting EVM System-level assessments. DOE Order (O) 413.3B, the Office of Management and Budget (OMB) Circular A-11, and the Federal Acquisition Regulations (FAR) require implementation of an EVMS on DOE capital asset projects greater than $20M. The intent of this SOP is to provide processes based upon a common understanding of EVMS Industry and Government best practices for use by the Department of Energy (DOE) oversight, program, and project teams, as well as contractors doing business with DOE. Surveillance activities cover the areas of surveillance objectives, suggested processes, roles, and responsibilities. All information contained herein provides detailed processes to implement the requirements in DOE O 413.3B.

  6. NREL: Biomass Research - Standard Procedures for Microalgal Biofuels

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Analysis Standard Procedures for Microalgal Biofuels Analysis Capabilities in Microalgal Analysis NREL's Algal Biofuels Research team can work with you to analyze the chemical composition of algae as a biomass feedstock. NREL develops laboratory analytical procedures (LAPs) for analyzing microalgal biofuels. These procedures help scientists and analysts understand more about the chemical composition of algae as a feedstock to convert to biofuels. For more procedures, see the biomass

  7. Model Recovery Procedure for Response to a Radiological Transportation...

    Office of Environmental Management (EM)

    for Response to a Radiological Transportation Incident Model Recovery Procedure for Response to a Radiological Transportation Incident This Transportation Emergency...

  8. TMACS test procedure TP010: Integration summary. Revision 6

    SciTech Connect (OSTI)

    Spurling, D.G.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure verifies that Test Procedures 1, 2, 3, 5 and 9 (WHC-SD-WM-TRP-105, 106, 107, 109 and 113) of TMACS Software Release 4.1 have been successfully completed.

  9. Policy Guidance Memorandum #37 Procedures for Excepted Service...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Excepted Service Exceptionally Well Qualified (EWQ) Appointments Policy Guidance Memorandum 37 Procedures for Excepted Service Exceptionally Well Qualified (EWQ) Appointments ...

  10. Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rulemaking | Department of Energy Test Procedure for Pumps, Notice of Proposed Rulemaking Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking This document is Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking. PDF icon commercial_industrial_pumps_tp_nopr.pdf More Documents & Publications 2015-12-30 Energy Conservation Program: Test Procedure for Pumps Final Rule Draft PEI Calculator Energy Conservation Program: Energy

  11. CLOSEOUT PROCEDURES FOR RECOVERY ACT GRANTS UNDER THE WEATHERIZATION

    Energy Savers [EERE]

    ASSISTANCE PROGRAM | Department of Energy CLOSEOUT PROCEDURES FOR RECOVERY ACT GRANTS UNDER THE WEATHERIZATION ASSISTANCE PROGRAM CLOSEOUT PROCEDURES FOR RECOVERY ACT GRANTS UNDER THE WEATHERIZATION ASSISTANCE PROGRAM This document contains information on closeout procedures for Recovery Act Grants under the Weatherization Assistance Program (WAP). PDF icon wap_closeout_guidance.pdf More Documents & Publications WPN 12-3: Closeout Procedures for Recovery Act Grants Under the

  12. Quality Procedure - Causal Analysis and Trending | Department of Energy

    Energy Savers [EERE]

    Causal Analysis and Trending Quality Procedure - Causal Analysis and Trending This Quality Procedure describes the process for reviewing and analyzing the cause(s) of issues and findings identified from the Office of Quality Assurance oversight activities and reporting trends as a result of this review. PDF icon Quality Procedure - Causal Analysis and Trending More Documents & Publications Quality Procedure - Independent Assessments Independent Oversight Review, Oak Ridge Transuranic Waste

  13. NREL: Biomass Research - Standard Procedures for Biomass Compositional

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Analysis Standard Procedures for Biomass Compositional Analysis Capabilities in Biomass Analysis NREL's Biomass Compositional Analysis Technologies team can work with you to characterize the chemical composition of biomass feedstocks, intermediates, and products. NREL develops laboratory analytical procedures (LAPs) for standard biomass analysis. These procedures help scientists and analysts understand more about the chemical composition of raw biomass feedstocks and process intermediates

  14. Records Management Procedures for Storage, Transfer and Retrieval of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Records from WNRC | Department of Energy Procedures for Storage, Transfer and Retrieval of Records from WNRC Records Management Procedures for Storage, Transfer and Retrieval of Records from WNRC Develop and maintain a records management program which preserves adequate records documenting the organization, functions, policies, decisions, procedures, and essential transactions, including record material containing evidence or information appropriate for preservation because of its

  15. Regulations for Implementing the Procedural Provisions of NEPA | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Regulations for Implementing the Procedural Provisions of NEPA Regulations for Implementing the Procedural Provisions of NEPA PDF icon CEQ Regulations for Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508) More Documents & Publications Effective Public Participation Forty Most Asked Questions Concerning CEQ's National Environmental Policy Act Regulations A Citizen's Guide to the NEPA: Having Your Voice Heard

  16. TMACS Test Procedure TP008: SACS Interface. Revision 5

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS SACS Interface functions.

  17. TMACS test procedure TP009: Acromag driver. Revision 5

    SciTech Connect (OSTI)

    Bass, R.B.; Washburn, S.J.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the testing of the functionality of the TMACS Acromag driver software in conjunction with a new bridge for the Panalarm Annunciator system.

  18. External Independent Review (EIR) Standard Operating Procedure (SOP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2010 | Department of Energy September 2010 External Independent Review (EIR) Standard Operating Procedure (SOP) September 2010 PDF icon EXTERNAL INDEPENDENT REVIEW (EIR) STANDARD OPERATING PROCEDURE (SOP) September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure (SOP) Septemebr

  19. External Independent Review (EIR) Standard Operating Procedure (SOP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Septemebr 2010 | Department of Energy Septemebr 2010 External Independent Review (EIR) Standard Operating Procedure (SOP) Septemebr 2010 PDF icon External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure (SOP) September

  20. SPR Acquisition Procedures - Final Rulemaking | Department of Energy

    Energy Savers [EERE]

    Acquisition Procedures - Final Rulemaking SPR Acquisition Procedures - Final Rulemaking Point of Contact: Nathan Harvey, Director of Operatons and Readiness, Strategic Petroleum Reserve, (202) 586-4691 PDF icon SPR Crude Oil Acquisition Procedures - Final Rulemaking More Documents & Publications 2009 SPR Report to Congress Historical SPR Annual Reports to Congress Price Competitive Sale of Strategic Petroleum Reserve Petroleum; Standard Sales Provisions; Final Rule