Powered by Deep Web Technologies
Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

EA-1131: Relocation of Neutron Tube Target Loading Operation, Los Alamos Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the proposal to relocate the Neutron Tube Target Loading operations at the U.S. Department of Energy Los Alamos National Laboratory in New Mexico from...

2

Loads on drillpipe during jarring operations  

Science Conference Proceedings (OSTI)

Jarring implies heavy loads on the drillstring. The highest load on the drillpipe before jarring is at the rig floor. This paper discusses loads on drillpipe before, under, and after jarring. The authors show that for most situations, the shock wave from the jar impact does not imply additional load on the drillpipe compared with static load. The theoretical results are confirmed by measurements of a jarring operation with stuck point at [approx] 1,200 m measured depth. Loads on the drillpipe can be a limited factor in jarring operations because fear of possible additional loads from jarring dynamics may restrict the trip force (overpull) on the jar. The main conclusion is that dynamic jar forces do not give additional loads on drillpipe. This information can be used to set an optimal trip force on the jar.

Aarrestad, T.V.; Kyllingstad, A.

1994-12-01T23:59:59.000Z

3

EIS-0238: Continued Operation of the Los Alamos National Laboratory, Los  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

238: Continued Operation of the Los Alamos National 238: Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico EIS-0238: Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico Summary This EIS evaluates the potential environmental impacts of a proposal to continue operating the Los Alamos National Laboratory (LANL) located in Los Alamos County, in north-central New Mexico. DOE has identified and assessed four alternatives for the operation of LANL: (1) No Action, (2) Expanded Operations, (3) Reduced Operations, and (4) Greener. Expanded Operations is DOE's Preferred Alternative, with the exception that DOE would only implement pit manufacturing at a level of 20 pits per year. Public Comment Opportunities None available at this time. Documents Available for Download

4

Combustion Impacts of Flexible Operation: Low Load, Load Following, and Increased Staging Impact on Boiler Tubes  

Science Conference Proceedings (OSTI)

Over the past few years, coal-fired generating units have changed from stable base load operation to flexible operation, including periods of prolonged low-load operation. These changes in operation can have various adverse effects on all plant equipment, particularly in older units and may impact their ability to operate without tube failures due to elevated levels of fireside corrosion and circumferential cracking. This report discusses the combustion-related impacts of low-load, load-following, ...

2013-12-23T23:59:59.000Z

5

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Los Alamos Postdoc Program Office  

E-Print Network (OSTI)

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Los Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA The Los Alamos Postdoc

6

CRAD, Conduct of Operations - Los Alamos National Laboratory Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conduct of Operations - Los Alamos National Laboratory Waste Conduct of Operations - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Conduct of Operations - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Conduct of Operations Program portion of an Operational Readiness Review at the Los Alamos National Laboratory, Waste Characterization, Reduction, and Repackaging Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Conduct of Operations - Los Alamos National Laboratory Waste

7

Technical Assistance to ISO's and Grid Operators For Loads Providing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Assistance to ISO's and Grid Operators For Loads Technical Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability Technical Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability Project demonstrates and promotes the use of responsive load to provide ancillary services; helps ISOsand grid operators understand the resource and how best to apply it. Technical Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability More Documents & Publications Loads Providing Ancillary Services: Review of International Experience 2012 Load as a Resource Program Peer Review New York Independent System Operator, Smart Grid RFI: Addressing Policy and Logistical Challenges.

8

Load Schedule Coordination for a Large Linear Accelerator: An Operation Powerplay Concept  

E-Print Network (OSTI)

Operation Powerplay is a viable electric load management program developed and tested with Department of Energy funding and support. It is a concept designed to provide financial benefits to a utility and one or more of its customers through priority-based or on-demand load shaving. Currently being implemented in pilot form is a variation of Operation Powerplay. In this instance, it is the mutual cooperation between the Western Area Power Administration (Western), which markets hydro-power from Federal power projects, and the Los Alamos National Laboratory (LANL) at Los Alamos, New Mexico. With this variation, only the portion of LANL's total load requirement for the Linear Accelerator at the Meson Physics Facility is targeted to be managed by this arrangement. This paper will discuss the negotiations and agreements between LANL and Western to maximize use of the Meson facility and minimize operational costs through this variation of Operation Powerplay.

Johnson, W. H.

1984-01-01T23:59:59.000Z

9

Extracting Operating Modes from Building Electrical Load Data: Preprint  

Science Conference Proceedings (OSTI)

Empirical techniques for characterizing electrical energy use now play a key role in reducing electricity consumption, particularly miscellaneous electrical loads, in buildings. Identifying device operating modes (mode extraction) creates a better understanding of both device and system behaviors. Using clustering to extract operating modes from electrical load data can provide valuable insights into device behavior and identify opportunities for energy savings. We present a fast and effective heuristic clustering method to identify and extract operating modes in electrical load data.

Frank, S.; Polese, L. G.; Rader, E.; Sheppy, M.; Smith, J.

2012-01-01T23:59:59.000Z

10

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Los Alamos Postdoc Program Office  

E-Print Network (OSTI)

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Los / Operated by Los Alamos National Security LLC for DOE/NNSA provide you with an invoice before we receive Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Los Alamos Postdoc Career

11

WRAP Trupact Loading System Operational Test Procedure  

Science Conference Proceedings (OSTI)

This procedure has been prepared to verify the TRUPACT System (TS) operates in accordance with system design and specifications.

DOSRAMOS, E.V.

1999-09-01T23:59:59.000Z

12

WRAP TRUPACT loading systems operational test report  

SciTech Connect

This Operational Test Report documents the operational testing of the TRUPACT process equipment HNF-3918, Revision 0, TRUPACT Operational Test Procedure. The test accomplished the following: Procedure validation; Facility equipment interface; Facility personnel support; and Subcontractor personnel support interface. Field changes are documented as test exceptions with resolutions. All resolutions are completed or a formal method is identified to track the resolution through to completion.

DOSRAMOS, E.V.

1999-09-01T23:59:59.000Z

13

Dynamic model of power system operation incorporating load control  

SciTech Connect

Load management has been proposed as a means whereby an electric utility can reduce its requirements for additional generation, transmission, and distribution investments, shift fuel dependency from limited to more abundant energy resources, and improve the efficiency of the electric energy system. There exist, however, serious technological and economic questions which must be answered to define the cost trade-offs between initiating a load management strategy or adding additional capacity to meet the load. One aspect of this complex problem is to determine how the load profile might be modified by the load management option being considered. Towards this end, a model has been developed to determine how a power system with an active load control system should be operated to make the best use of its available resources. The model is capable of handling all types of conventional generating sources including thermal, hydro, and pumped storage units, and most appliances being considered for direct control including those with inherent or designed storage characteristics. The model uses a dynamic programming technique to determine the optimal operating strategy for a given set of conditions. The use of the model is demonstrated. Case study results indicate that the production cost savings that can be achieved through the use of direct load control are highly dependent on utility characteristics, load characteristics, storage capacity, and penetration. The load characteristics that produce the greatest savings are: large storage capacity; high coincidence with the system peak; large connected load per point; and moderately high diversity fraction.

Kuliasha, M.A.

1980-10-01T23:59:59.000Z

14

Determining the Cost of Cycling and Varied Load Operations: Methodology  

Science Conference Proceedings (OSTI)

For many reasons—heightened wholesale electricity competition under deregulation, new market rules, growing capacity due to additions of new gas-fired capacity, environmental pressures on coal units—the power industry must operate power plants differently. In particular, many generating units that formerly ran around the clock must adjust operations to cycle or to follow load (demand). This report describes a new methodology for estimating the long-term wear and tear costs that inevitably acc...

2002-11-22T23:59:59.000Z

15

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Los Alamos Postdoc Program Office  

E-Print Network (OSTI)

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Los Alamos National Security LLC for DOE/NNSA 2) The catering company (or appropriate goods/service provider

16

Los Alamos National Laboratory to begin DARHT 2 operations  

NLE Websites -- All DOE Office Websites (Extended Search)

January » January » DARHT 2 operations begin Los Alamos National Laboratory to begin DARHT 2 operations The Dual Axis Radiographic Hydrodynamic Test facility has officially become "dual" with authorization to begin full power operations of Axis 2. January 29, 2008 DARHT's electron accelerators use large, circular aluminum structures to create magnetic fields that focus and steer a stream of electrons down the length of the accelerator. Tremendous electrical energy is added along the way. When the stream of high-speed electrons exits the accelerator it is "stopped" by a tungsten target resulting in an intense burst of X-rays that are used to create digital images of mock nuclear devices as they implode. DARHT's electron accelerators use large, circular aluminum structures to

17

Engineering to Control Noise, Loading, and Optimal Operating Points  

Science Conference Proceedings (OSTI)

Successful engineering of low-energy nuclear systems requires control of noise, loading, and optimum operating point (OOP) manifolds. The latter result from the biphasic system response of low-energy nuclear reaction (LENR)/cold fusion systems, and their ash production rate, to input electrical power. Knowledge of the optimal operating point manifold can improve the reproducibility and efficacy of these systems in several ways. Improved control of noise, loading, and peak production rates is available through the study, and use, of OOP manifolds. Engineering of systems toward the OOP-manifold drive-point peak may, with inclusion of geometric factors, permit more accurate uniform determinations of the calibrated activity of these materials/systems.

Mitchell R. Swartz

2000-11-12T23:59:59.000Z

18

Impact of Minimum Load Operation on Steam Turbines  

Science Conference Proceedings (OSTI)

Some utilities, as part of a fleet management strategy, are keeping baseload-design plants that are not competitive for 24/7 dispatch at minimum loads to increase their ability to respond to changing demand. Units being operated this way face some associated risks and may see an additional drop in availability, further exacerbating supply management issues and increasing O&M costs. This report seeks to capture ...

2013-11-05T23:59:59.000Z

19

Environmental assessment of the relocation of Neutron Tube Target Loading Operations. Final document  

SciTech Connect

Neutron Tube Target Loading (NTTL) is an operation that involves the transferring (i.e. loading) of radioactive tritium gas onto metal target disks under an inert nitrogen atmosphere using a glovebox operation. The relocation of NTTL operations from the Pinellas Plant to the Los Alamos National Laboratory (LANL) in Los Alamos, New Mexico, was addressed in the Non-nuclear Consolidation Environmental Assessment (EA) of June 1993. This EA analyzes a Proposed Action to relocate the NTTL operations at LANL from Building 209 at TA-21 to Building 450 at TA-16. The Proposed Action would require the remodeling of Building 450 and some modifications to Buildings 205 and 205A, collectively referred to as the Weapons Engineering Tritium Facility (WETF) in TA-16. The construction of a change room addition would also be required to connect Building 450 and the WETF to take advantage of existing tritium control and confinement systems. Other construction activities and site modifications would include a new electrical substation, a new mechanical and electrical room, minor demolition work, two additional transportable buildings and a new parking area. An alternative to the Proposed Action includes keeping the NTTL operations at TA-21 (No Action). Alternatives considered but dismissed include the construction of a new NTTL laboratory at LANL, and the renovation of an alternative facility to Building 450 for conducting NTTL operations. None of the alternatives would enable the DOE to meet its mission responsibilities at LANL in a timely manner. The principle environmental issues associated with the Proposed Action include a minor amount of air emissions associated with construction activities and tritium operations and a small quantity of construction and low-level radioactive wastes. Human health and cumulative effects are expected to be negligible. On-site transportation of tritium between TA-21 and TA-16 to support NTTL operations would be eliminated.

1995-12-11T23:59:59.000Z

20

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Los Alamos National Security, HR-B -Revised February 9, 2010  

E-Print Network (OSTI)

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Los Alamos National Security LLC for DOE/NNSA Los Alamos National Security, HR-B - Revised February 9, 2010;An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Los Alamos

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Environmental Assessment for the Installation and Operation of Combustion Turbine Generators at Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOElEA- 430 DOElEA- 430 LA-UR-02-6482 Nationat Nudea- Security Administration Environmental Assessment for the Installation and Operation of Combustion Turbine Generators at Los Alamos National Laboratory, Los Alamos, New Mexico December II,2002 Department of Energy National Nuclear Security Administration Los Alamos Site Office Environmental Assessment for the Installation and Operation of Combustion Turbine Generators at LANL DOE LASO December 11, 2002 iii Contents ACRONYMS AND TERMS.......................................................................................................V EXECUTIVE SUMMARY ....................................................................................................... IX 1.0 PURPOSE AND NEED ........................................................................................................1

22

EIS-0238: Continued Operation of the Los Alamos National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Laboratory: Recovery and Storage of Strontium-90 (Sr-90) Fueled Radioisotope Thermal Electric Generators at Los Alamos National Laboratory August 13, 2002...

23

Evaluation of the Los Alamos National Security Emergency Operations...  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Evaluation of the Los Alamos National...

24

EIS-0388: Operation of a Biosafety Level 3 Facility at the Los Alamos  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

88: Operation of a Biosafety Level 3 Facility at the Los 88: Operation of a Biosafety Level 3 Facility at the Los Alamos National Laboratory, New Mexico EIS-0388: Operation of a Biosafety Level 3 Facility at the Los Alamos National Laboratory, New Mexico Summary This EIS evaluates the operation of a Biosafety Level 3 Facility (BSL-3 Facility) at the Los Alamos National Laboratory (LANL). A BSL-2 Alternative, an existing BSL-2 permitted facility, and a No Action Alternative will be analyzed. The EIS is currently on hold. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download December 30, 2005 EIS-0388: Extension of Scoping Period for the Notice of Intent to Prepare an Environmental Impact Statement Operation of a Biosafety Level 3 Facility at Los Alamos National

25

On the operating unit size of load/store architectures†  

Science Conference Proceedings (OSTI)

We introduce a strict version of the concept of a load/store instruction set architecture in the setting of Maurer machines. We take the view that transformations on the states of a Maurer machine are achieved by applying threads as considered in thread ...

J. a. Bergstra; C. a. Middelburg

2010-06-01T23:59:59.000Z

26

Facility Centered Assessment of the Los Alamos National Laboratory Science and Technology Operations - Facility Operations Director Managed Facilities, August 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

Review Report Review Report Facility Centered Assessment of the Los Alamos National Laboratory Science and Technology Operations - Facility Operations Director Managed Facilities May 2011 August 2011 Office of Health, Safety and Security Office of Enforcement and Oversight Office of Safety and Emergency Management Evaluations Table of Contents Background ................................................................................................................................................... 1 Results ........................................................................................................................................................... 2 Conduct of the FCA ......................................................................................................................... 2

27

Facility Centered Assessment of the Los Alamos National Laboratory Science and Technology Operations - Facility Operations Director Managed Facilities, August 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review Report Review Report Facility Centered Assessment of the Los Alamos National Laboratory Science and Technology Operations - Facility Operations Director Managed Facilities May 2011 August 2011 Office of Health, Safety and Security Office of Enforcement and Oversight Office of Safety and Emergency Management Evaluations Table of Contents Background ................................................................................................................................................... 1 Results ........................................................................................................................................................... 2 Conduct of the FCA ......................................................................................................................... 2

28

Integrating load management with supply-side operations - A case study  

SciTech Connect

The main topic of this paper analyses and discusses the operational integration of Load Management operations with co-generation, power-pool purchases/sells and other supply-side options, where the common denominator is the hourly short-run marginal cost. The second topic concerns the operational coordination problem between a generating utility and its retail distributors when both parties use load management. The thirds is the interactive impacts of interruptible sales and other demand-side programs on the distribution load curve. The discussion is based on the operational experiences at Skydkraft, the largest investor-owned utility in Sweden.

Edvinsson, M.J.; Nilsson, M.O.

1987-08-01T23:59:59.000Z

29

Modeling operator performance in low task load supervisory domains  

E-Print Network (OSTI)

Currently, numerous automated systems need constant monitoring but require little to no operator interaction for prolonged periods, such as unmanned aerial systems, nuclear power plants, and air traffic management systems. ...

Mkrtchyan, Armen A

2011-01-01T23:59:59.000Z

30

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA UNCLASSIFIED  

E-Print Network (OSTI)

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA UNCLASSIFIED #12;Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA of Energy's NNSA The Next 20 years ENERGY HEALTH ENVIRONMENT RESOURCES #12;Operated by Los

31

Audit of the radioactive liquid waste treatment facility operations at the Los Alamos National Laboratory  

SciTech Connect

Los Alamos National Laboratory (Los Alamos) generates radioactive and liquid wastes that must be treated before being discharged to the environment. Presently, the liquid wastes are treated in the Radioactive Liquid Waste Treatment Facility (Treatment Facility), which is over 30 years old and in need of repair or replacement. However, there are various ways to satisfy the treatment need. The objective of the audit was to determine whether Los Alamos cost effectively managed its Treatment Facility operations. The audit determined that Los Alamos` treatment costs were significantly higher when compared to similar costs incurred by the private sector. This situation occurred because Los Alamos did not perform a complete analysis of privatization or prepare a {open_quotes}make-or-buy{close_quotes} plan for its treatment operations, although a {open_quotes}make-or-buy{close_quotes} plan requirement was incorporated into the contract in 1996. As a result, Los Alamos may be spending $2.15 million more than necessary each year and could needlessly spend $10.75 million over the next five years to treat its radioactive liquid waste. In addition, Los Alamos has proposed to spend $13 million for a new treatment facility that may not be needed if privatization proves to be a cost effective alternative. We recommended that the Manager, Albuquerque Operations Office (Albuquerque), (1) require Los Alamos to prepare a {open_quotes}make-or-buy{close_quotes} plan for its radioactive liquid waste treatment operations, (2) review the plan for approval, and (3) direct Los Alamos to select the most cost effective method of operations while also considering other factors such as mission support, reliability, and long-term program needs. Albuquerque concurred with the recommendations.

1997-11-19T23:59:59.000Z

32

EIS-0380: Site-Wide Environmental Impact Statement for Continued Operation of the Los Alamos National Laboratory, New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

This Site-Wide EIS evaluates the continued operation of the Los Alamos National Laboratory (LANL). NNSA identified and assessed three alternatives for continued operation of LANL: (1) No Action, (2) Reduced Operations, and (3) Expanded Operations.

33

Final Site-Wide Environmental Impact Statement for the Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico (05/2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 * Book 1 2 * Book 1 Appendices A through H Final Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico DOE/EIS-0380 May 2008 iii COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) Title: Final Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico (SWEIS) (DOE/EIS-0380) Location: Los Alamos, New Mexico For additional information or for copies of the SWEIS, contact: Elizabeth Withers, EIS Document Manager NNSA Service Center - Albuquerque

34

Final Site-Wide Environmental Impact Statement for the Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico (05/2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Sections 1, 2, and 3 (pages 3-1 through 3-561) Final Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico DOE/EIS-0380 May 2008 Reader's Guide This Comment Response Document (CRD) for the Final Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico (LANL SWEIS or SWEIS) consists of four sections: * Chapter 1 - Overview of the Public Comment Process This section describes the public comment process for the Draft LANL SWEIS; the format

35

Final Site-Wide Environmental Impact Statement for the Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico (05/2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Section 3 (pages 3-562 through 3-1089) and Section 4 Final Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico DOE/EIS-0380 May 2008 Reader's Guide This Comment Response Document (CRD) for the Final Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico (LANL SWEIS or SWEIS) consists of four sections: * Chapter 1 - Overview of the Public Comment Process This section describes the public comment process for the Draft LANL SWEIS; the format

36

Draft Site-Wide EIS on the Continued Operation of the Los Alamos National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Responsible Agency: U.S. Department of Energy (DOE) Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agency: Incorporated County of Los Alamos Title: Draft Site-Wide Environmental Impact Statement on the Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico Contact: For further information, or to submit comments concerning this Draft Site-Wide Environmental Impact Statement (SWEIS), contact: Corey Cruz, Project Manager U.S. DOE, Albuquerque Operations Office P.O. Box 5400, Albuquerque, NM 87185 Telephone: 1-800-898-6623 Fax: 505-845-6392 For general information on DOE's National Environmental Policy Act (NEPA) process, contact: Carol Borgstrom, Director Office of NEPA Policy and Assistance (EH-42) U.S. DOE, 1000 Independence Avenue, SW, Washington, DC 20585 Telephone: 202-586-4600 or leave a message at 1-800-472-2756

37

Review of operating experience at the Los Alamos Plutonium Electrorefining Facility, 1963-1977  

Science Conference Proceedings (OSTI)

This report reviews the operation of the Los Alamos Plutonium Electrorefining Plant at Technical Area 21 for the period 1964 through 1977. During that period, approximately 1568 kg of plutonium metal, > 99.95% pure, was produced in 653 runs from 1930 kg of metal fabrication scrap, 99% pure. General considerations of the electrorefining process and facility operation and recommendations for further improvement of the process are discussed.

Mullins, L.J.; Morgan, A.N.

1981-12-01T23:59:59.000Z

38

Nuclear criticality safety in D and D operations: a Los Alamos experience  

SciTech Connect

Decommissioning operations at the Los Alamos National Laboratory require the interaction of several disciplines so that the effort to D&D radiological facilities can proceed unencumbered, on schedule, and within budget. Although playing a minor role, the Laboratory`s Nuclear Criticality Safety Group has provided criticality safety guidance to one such D&D team efficiently and cost-effectively. During the first major D&D effort at Los Alamos, a total of about 6 kilograms of uranium [U(93)] was recovered from a facility thought to contain only tens of grams.

Schlesser, J.A.

1996-12-31T23:59:59.000Z

39

Inspection Report - Radiological Waste Operations in Area G at Los Alamos National Laboratory, INS-O-13-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection Report Inspection Report Radiological Waste Operations in Area G at Los Alamos National Laboratory INS-O-13-03 March 2013 Department of Energy Washington, DC 20585 March 20, 2013 MEMORANDUM FOR THE MANAGER, LOS ALAMOS FIELD OFFICE, NATIONAL NUCLEAR SECURITY ADMINISTRATION FROM: Sandra D. Bruce Assistant Inspector General for Inspections Office of Inspector General SUBJECT: INFORMATION: Inspection Report on "Radiological Waste Operations in Area G at Los Alamos National Laboratory" INTRODUCTION Los Alamos National Laboratory (Los Alamos) has a national security mission that includes science, engineering and technology related to radioactive and hazardous materials such as plutonium, americium, asbestos and lead. Material Disposal Area G, located in Technical Area

40

Global performance analysis of floating harbor and container ship for loading and offloading operation  

E-Print Network (OSTI)

The feasibility and general performance of a floating harbor system is studied with regard to the relative motion of a floating quay and a container ship. A 350[m]× 160[m] box-type barge is selected as the floating harbor and it is positioned by a dolphin mooring system. The container ship is tied to the land wall by hawsers. The hydrodynamic interactions between floating bodies and a fixed quay wall in close proximity with a side-by-side arrangement are investigated. A three dimensional wave-body diffraction/radiation panel program WAMIT is used for the calculation of hydrodynamic information and response amplitude operators (RAO) of the three bodies in frequency domain. Subsequently, the vessel-mooring coupled dynamic analysis program WINPOST is employed to produce motion time histories in time domain. The frequency-domain RAO is successfully compared with time-domain RAO in case viscous forces are neglected. Compared to Brajesh Kumar’s (2005) study, 12×12 full hydrodynamic interactions between the two floating bodies are included and dynamic wind loading is considered in addition to wave and current loadings. All the relative motion statistics are calculated from the respective motion time histories for a typical operational condition and a typical survival condition. The relative motion between the interacting bodies is small in the operational condition to ensure the efficacy of container loading and offloading operation from both sides of the ship while the loading and offloading operation is not available in the survival condition.

Lim, Sung Ho

2007-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Program on Technology Innovation: Effect of Hydrogen Addition on Part Load Operation of Dry, Low NOx Combustors  

Science Conference Proceedings (OSTI)

Emissions and operability of Dry, Low NOx gas turbines at part load can be an issue for operators. One potential remedy for this problem is the addition of hydrogen to natural gas supplies when operating at part load. This report examines the effect of hydrogen addition on part load emissions and operating envelope. Chemical Reactor Modeling is used to simulate the fluid mechanics of the gas turbine combustor, while allowing for accurate consideration of the chemical kinetics which control emission produ...

2006-09-11T23:59:59.000Z

42

Controller for controlling operation of at least one electrical load operating on an AC supply, and a method thereof  

DOE Patents (OSTI)

A controller is provided for controlling operation of at least one electrical load operating on an AC supply having a typical frequency, the AC supply being provided via power transformers by an electrical power distribution grid. The controller is associated with the load and comprises an input interface for coupling the controller to the grid, a frequency detector for detecting the frequency of the AC supply and producing a signal indicative of the frequency, memory modules for storing preprogrammed commands, a frequency monitor for reading the signal indicative of the frequency and producing frequency data derived thereof, a selector for selecting at least one of the preprogrammed commands with respect to the frequency data, a control unit for producing at least one command signal representative of the selected preprogrammed commands, and an output interface including a device responsive to the command signal for controlling the load. Therefore, the load can be controlled by means of the controller depending on the frequency of the AC supply.

Cantin, Luc (Baie Comeau, CA); Deschenes, Mario (Baie Comeau, CA); D' Amours, Mario (Sept Iles, CA)

1995-08-15T23:59:59.000Z

43

An examination of loads and responses of a wind turbine undergoing variable-speed operation  

DOE Green Energy (OSTI)

The National Renewable Energy Laboratory has recently developed the ability to predict turbine loads and responses for machines undergoing variable-speed operation. The wind industry has debated the potential benefits of operating wind turbine sat variable speeds for some time. Turbine system dynamic responses (structural response, resonance, and component interactions) are an important consideration for variable-speed operation of wind turbines. The authors have implemented simple, variable-speed control algorithms for both the FAST and ADAMS dynamics codes. The control algorithm is a simple one, allowing the turbine to track the optimum power coefficient (C{sub p}). The objective of this paper is to show turbine loads and responses for a particular two-bladed, teetering-hub, downwind turbine undergoing variable-speed operation. The authors examined the response of the machine to various turbulent wind inflow conditions. In addition, they compare the structural responses under fixed-speed and variable-speed operation. For this paper, they restrict their comparisons to those wind-speed ranges for which limiting power by some additional control strategy (blade pitch or aileron control, for example) is not necessary. The objective here is to develop a basic understanding of the differences in loads and responses between the fixed-speed and variable-speed operation of this wind turbine configuration.

Wright, A.D.; Buhl, M.L. Jr.; Bir, G.S.

1996-11-01T23:59:59.000Z

44

HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT SUMMARY OF COMBINED THERMAL & OPERATING LOADS  

Science Conference Proceedings (OSTI)

This report summarizes the results of the Double-Shell Tank Thermal and Operating Loads Analysis (TOLA) combined with the Seismic Analysis. This combined analysis provides a thorough, defensible, and documented analysis that will become a part of the overall analysis of record for the Hanford double-shell tanks (DSTs).

MACKEY, T.C.

2006-03-17T23:59:59.000Z

45

Operational Status and Life Extension Plans for the Los Alamos Neutron Science Center (LANSCE)  

SciTech Connect

The Los Alamos Neutron Science Center (LANSCE) accelerator and beam delivery complex generates the proton beams that serve three neutron production sources, a proton radiography facility and a medical and research isotope production facility. The recent operating history of the facility, including both achievements and challenges, will be reviewed. Plans for performance improvement will be discussed, together with the underlying drivers for the ongoing LANSCE Linac Risk Mitigation (LRM) project. The details of this latter project will also be discussed.

Erickson, John L. [Los Alamos National Laboratory; Rees, Daniel E. [Los Alamos National Laboratory

2011-01-01T23:59:59.000Z

46

Influence of Cycling and Low-Load Operation on Cycle Chemistry Control and Requirements  

Science Conference Proceedings (OSTI)

The purity of water and steam is central to ensuring component availability and reliability of electric steam generating equipment. The objective and focus of cycle chemistry is to prevent or control and reduce corrosion and the accumulation of deposits in the steam/water circuit of power plants. Current trends in electricity demand have resulted in changing load dispatch for coal- and gas-fired assets worldwide and in an increasing need to provide greater flexibility in the operating patterns of ...

2013-12-19T23:59:59.000Z

47

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA CAS Working Conference  

E-Print Network (OSTI)

Blake Research Library Director Los Alamos National Laboratory #12;Operated by Los Alamos National Conference Library and Information Services November 2011 Slide 1 Research Libraries: Now and Forward Miriam Services LANL Research Library Leader in the DOE Complex & federal agencies · Work with DOE National

48

`OFFICIAL USE ONLY' An Equal Opportunity Employer / Operated by Los Alamos National Security, LLC for DOE/NNSA  

E-Print Network (OSTI)

for DOE/NNSA Los Alamos National Laboratory Principal Investigator Questionnaire 1. External Partner, LLC for DOE/NNSA 5. Rights and Inventions Yes No 1. Will any patentable processes (LANL inventions;`OFFICIAL USE ONLY' An Equal Opportunity Employer / Operated by Los Alamos National Security, LLC for DOE/NNSA

49

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Bradbury Science Museum  

E-Print Network (OSTI)

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Bradbury Alamos National Security LLC for DOE/NNSA The historical museum in town (http

50

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA For Participants in the LANS Defined Benefit Pension Plan  

E-Print Network (OSTI)

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Employer / Operated by Los Alamos National Security LLC for DOE/NNSA value of Plan benefits. Those changes

51

Evaluation of the Los Alamos National Security Emergency Operations Divison Emergency Management Self-assessment Practices, June 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

06-08 06-08 Site: Los Alamos National Laboratory Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Evaluation of the Los Alamos National Security Emergency Operations Division Emergency Management Self-assessment Practices Dates of Activity : 06/06/2011-06/08/2011 Report Preparer: John Bolling/Randy Griffin Activity Description/Purpose: Los Alamos National Security, LLC (LANS) and the Los Alamos Site Office (LASO) requested that the U.S. Department of Energy (DOE), Office of Health, Safety and Security (HSS), Office of Safety and Emergency Management Evaluations evaluate LANS's Emergency Operations Division emergency management self- assessment practices. Utilizing the self-assessment of the Los Alamos National Laboratory (LANL) emergency

52

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the U.S. Department of Energy's NNSA the U.S. Department of Energy's NNSA U N C L A S S I F I E D Nanoscale Stable Precipitation- Strengthened Steels for Nuclear Applications Nuclear Energy Enabling Technologies (NEET) Reactor Materials LANL - K.D. Clarke (PI), A.J. Clarke, R.D. Field, S.A. Maloy, Y. Wang, R.E. Hackenberg NETL - O.N. Dogan, P.D. Jablonski CSM - K.O. Findley, J.G. Speer, K. Tippey NU - S. Vaynman, M.E. Fine DOE-NE Materials Crosscut Coordination Meeting, August 20, 2013 LA-UR-13-26637 Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I E D Overview Slide 2 n Background n Investigative Team n Materials Processing Strategies * Colorado School of Mines (CSM) * Northwestern University (NU) n Material production

53

Manually-Operated Crate Dismantlement System for Los Alamos National Laboratory  

SciTech Connect

Los Alamos National Laboratory currently possesses between 500 and 800 fiberglass-reinforced plywood crates that contain hazardous materials that need to be decontaminated. To access the hazardous material, a system is needed to dismantle the crate. Currently, crates are dismantled by workers using hand-held tools. This technique has numerous disadvantages. One disadvantage is that it is difficult for a worker to hold the tool for an extended period of time in the awkward angles and positions necessary to fully size-reduce the crate. Other disadvantages of using hand tools include managing power cords and vacuum hoses, which become entangled or can act as tripping hazards. In order to improve the crate opening and size-reduction task, Florida International University's Hemispheric Center for Environmental Technology (HCET) is developing a manually operated crate dismantlement system. This versatile system is expected to greatly increase worker efficiency while decreasing fatigue and the possibility of accidents. (authors)

Laffitte, John; Lagos, Leo; Morales, Miguel [Florida International University, Miami, Florida (United States)

2002-07-01T23:59:59.000Z

54

LA-UR-07-6494 An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA  

E-Print Network (OSTI)

LA-UR-07-6494 An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA-6494 An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA · Homeland by Los Alamos National Security LLC for DOE/NNSA Your Letter of Interest should include the following

55

Design, construction, and initial operation of the Los Alamos National Laboratory salt-gradient solar pond  

DOE Green Energy (OSTI)

A 232 m/sup 2/ solar pond was constructed at Los Alamos National Laboratory for the purpose of studying pond hydrodynamics on a large scale and to complement the flow visualization and one-dimensional pond simulator experiments that are ongoing at the Laboratory. Design methods and construction techniques, some of which are unique to this pond, are described in detail. The pond was excavated from a soft volcanic rock known as tuff; such rock forms a large fraction of the Los Alamos area surface geology. Because tuff has a small thermal conductivity, little insulation was required to reduce perimeter energy losses. In addition, the strength of tuff permitted the pond to be built with vertical side walls; this design eliminated local side wall convection in the gradient zone that is possible with sloping side walls. Instrumentation in the pond consists of traversing and fixed rakes of thermometers and salinity probes, an underwater pyranometer, and a weather station. The traversing rake is a wheeled trolley driven vertically on a rectangular rail. Installed on the trolley are coplanar platinum RTDs, a point conductivity probe, and an induction salinometer. The stationary rake supports 28 thermocouples and 28 sample-fluid withdrawal taps located every 10 cm. About 127 T of sodium chloride has been introduced and is nearly dissolved. A 120-cm-thick salinity gradient was established and the pond is heating. Preliminary results indicate a lower-convective-zone heating rate of 1.2/sup 0/C/day during the pond's first month of operation. Recommendations on pond design, construction, and instrumentation are presented.

Jones, G.F.; Meyer, K.A.; Hedstrom, J.C.; Dreicer, J.S.; Grimmer, D.P.

1983-01-01T23:59:59.000Z

56

Dynamic analysis of floating quay and container ship for container loading and offloading operation  

E-Print Network (OSTI)

A floating quay container terminal is used for loading or unloading from container ships from both sides of a floating quay. The side-by-side Liquefied Natural Gas (LNG) offloading operation from floating terminals to LNG carriers is very similar to that from super-container ships to floating quay-walls. The hydrodynamic interaction effects among a fixed quay, container ship and floating quay, which are parallel to one another, are investigated. The three body side-by-side arrangement is compared with the individual freely floating body in the absence/presence of the fixed quay to identify the interaction effects. Hydrodynamic coefficients of the interacting bodies are obtained using a three dimensional constant panel method, WAMIT. Using a vessel-lines coupled dynamic analysis computer program WINPOST, the relative motion between floating quay and container ship is simulated in time domain. It is assumed in the present study that the floating quay is positioned by a dolphin mooring system. This analysis provides the relative motion among container ship, fixed and floating quay to ascertain that container loading and offloading can be performed in the severe wave condition without any problem.

Kumar, Brajesh

2005-12-01T23:59:59.000Z

57

Distrubance Tracking and Blade Load Control of Wind Turbines in Variable-Speed Operation: Preprint  

DOE Green Energy (OSTI)

A composite state-space controller was developed for a multi-objective problem in the variable-speed operation of wind turbines. Disturbance Tracking Control theory was applied to the design of a torque controller to optimize energy capture under the influence of persistent wind disturbances. A limitation in the theory for common multi-state models is described, which led to the design of a complementary pitch controller. The goal of the independent blade pitch design was to minimize blade root fatigue loads. Simulation results indicate an 11% reduction in fatigue damage using the proposed controllers, compared to a conventional torque-only design. Meanwhile, energy capture is almost identical, partly because of nonlinear effects.

Stol, K. A.

2003-01-01T23:59:59.000Z

58

Integration of Wind Generation and Load Forecast Uncertainties into Power Grid Operations  

Science Conference Proceedings (OSTI)

In this paper, a new approach to evaluate the uncertainty ranges for the required generation performance envelope, including the balancing capacity, ramping capability and ramp duration is presented. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (CAISO) real life data have shown the effectiveness and efficiency of the proposed approach.

Makarov, Yuri V.; Etingov, Pavel V.; Huang, Zhenyu; Ma, Jian; Chakrabarti, Bhujanga B.; Subbarao, Krishnappa; Loutan, Clyde; Guttromson, Ross T.

2010-04-20T23:59:59.000Z

59

EIS-0388: Operation of a Biosafety Level 3 Facility at the Los Alamos National Laboratory, New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the operation of a Biosafety Level 3 Facility (BSL–3 Facility) at the Los Alamos National Laboratory (LANL). A BSL-2 Alternative, an existing BSL-2 permitted facility, and a No Action Alternative will be analyzed. The EIS is currently on hold.

60

Environmental Assessment for the Proposed Issuance of an Easement to Public Service Company of New Mexico for the Construction and Operation of a 12-inch Natural Gas Pipeline within Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Environmental Assessment for the Proposed Issuance of an Easement to Public Service Company of New Mexico for the Construction and Operation of a 12-inch Natural Gas Pipeline within Los Alamos National Laboratory, Los Alamos, New Mexico July 24, 2002 Department of Energy National Nuclear Security Administration Office of Los Alamos Site Operations Proposed Pipeline Easement Environmental Assessment DOE OLASO July 24, 2002 iii CONTENTS ACRONYMS AND TERMS................................................................................................................vii EXECUTIVE SUMMARY...................................................................................................................ix 1.0 PURPOSE AND NEED................................................................................................................1

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Apparatus and method for partial-load operation of a combined gas and steam turbine plant  

SciTech Connect

Apparatus and method are disclosed for the partial load operation of a combined gas turbine and steam turbine plant, including a shaft being connected to the gas turbine and drivable at a given nominal speed of rotation, a first generator being connected to the shaft and electrically connectible to an electric network, a compressor being connected to the shaft and connected upstream of the gas turbine in gas flow direction, a heat exchanger having an output and a variable heat supply and being connected upstream of the gas turbine in gas flow direction, a steam generator for the steam turbine being connected downstream of the gas turbine in gas flow direction for receiving exhaust gases therefrom, a second generator being connected to the steam turbine and electrically connectible to the electric network for supplying given nominal power thereto along with the first generator, means for giving to the electric network and taking away from the network at least part of the nominal power if the shaft rotates at less than the nominal speed of rotation, and means for reducing the speed of rotation of the gas turbine for preventing a substantial drop in temperature at the output of the heat exchanger if the heat supply of the heat exchanger is reduced.

Becker, B.; Finckh, H.; Meyer-pittroff, R.

1982-07-20T23:59:59.000Z

62

Final Site-Wide Environmental Impact Statement for the Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico (05/2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I MAJOR MATERIAL DISPOSAL AREA REMEDIATION, CANYON CLEANUPS, AND OTHER CONSENT ORDER ACTIONS I-1 Implementing the Consent Order NNSA intends to implement actions necessary to comply with the Compliance Order on Consent (Consent Order) regardless of decisions it makes on other actions analyzed in the LANL SWEIS. Actions associated with implementing the Consent Order are included in the Expanded Operations Alternative; however, their implementation is not contingent on other actions that are part of that alternative. APPENDIX I MAJOR MATERIAL DISPOSAL AREA REMEDIATION, CANYON CLEANUPS, AND OTHER CONSENT ORDER ACTIONS Los Alamos National Laboratory (LANL) conducts operations in support of the National Nuclear Security Administration (NNSA), a semi-autonomous administration within the U.S. Department

63

Hydrogen loaded metal for bridge-foils for enhanced electric gun/slapper detonator operation  

DOE Patents (OSTI)

The invention provides a more efficient electric gun or slapper detonator ich provides a higher velocity flyer by using a bridge foil made of a hydrogen loaded metal.

Osher, John E. (Alamo, CA)

1992-01-01T23:59:59.000Z

64

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Measuring sound in solids at NHMFL  

E-Print Network (OSTI)

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Measuring Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA 2Unclassified All the science National Security LLC for DOE/NNSA 3Unclassified Linear elasticity--we like it! , / 1 2 TS k l ij ijkl l k

Weston, Ken

65

Hydrogen loaded metal for bridge-foils for enhanced electric gun/slapper detonator operation  

DOE Patents (OSTI)

The invention provides a more efficient electric gun or slapper detonator which provides a higher velocity flyer by using a bridge foil made of a hydrogen loaded metal. 8 figs.

Osher, J.E.

1992-01-14T23:59:59.000Z

66

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations  

SciTech Connect

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

Makarov, Yuri V.; Huang, Zhenyu; Etingov, Pavel V.; Ma, Jian; Guttromson, Ross T.; Subbarao, Krishnappa; Chakrabarti, Bhujanga B.

2010-01-01T23:59:59.000Z

67

Environmental Assessment for Leasing Land for the Siting, Construction and Operation of a Commercial AM Radio Antenna at Los Alamos National Laboratory, Los Alamos, NM  

Science Conference Proceedings (OSTI)

The United States (U.S.) Department of Energy (DOE) proposes to lease approximately 3 acres of land at the Los Alamos National Laboratory (LANL) on the southeast tip of Technical Area (TA) 54 for the siting, construction and operation of an AM radio broadcasting antenna. This Environmental Assessment (EA) has been developed in order to assess the environmental effects of the Proposed Action and No Action alternative. The Proposed Action includes the lease of land for the siting, construction and operation of an AM radio broadcasting antenna in TA-54, just north of Pajarito Road and State Highway 4. The No Action Alternative was also considered. Under the No Action Alternative, DOE would not lease land on LANL property for the siting and operation of an AM radio broadcasting antenna; the DOE would not have a local station for emergency response use; and the land would continue to be covered in native vegetation and serve as a health and safety buffer zone for TA-54 waste management activities. Other potential sites on LANL property were evaluated but dismissed for reasons such as interference with sensitive laboratory experiments. Potential visual, health, and environmental effects are anticipated to be minimal for the Proposed Action. The radio broadcasting antenna would be visible against the skyline from some public areas, but would be consistent with other man-made objects in the vicinity that partially obstruct viewsheds (e.g. meteorological tower, power lines). Therefore, the net result would be a modest change of the existing view. Electromagnetic field (EMF) emissions from the antenna would be orders or magnitude less than permissible limits. The proposed antenna construction would not affect known cultural sites, but is located in close proximity to two archaeological sites. Construction would be monitored to ensure that the associated road and utility corridor would avoid cultural sites.

N /A

2000-02-16T23:59:59.000Z

68

Customization of the EPRI Artificial Neural Network Short-Term Load Forecaster (ANNSTLF) and User Support for the California Independent System Operator (CA-ISO)  

Science Conference Proceedings (OSTI)

Load forecasting is an important part of power system planning and operation. In the past, forecasting was achieved by extrapolating existing load data combined with other influencing factors. This method is no longer accurate enough. The Artificial Neural Network Short-Term Load Forecaster (ANNSTLF) is a tool for the quick and accurate prediction of hourly loads that provides the level of accuracy required by today's complex and competitive power markets. This report describes all the deliverables for t...

2002-11-19T23:59:59.000Z

69

WaveDyn: A Design Tool for Performance & Operational Loads Modeling of WECs  

NLE Websites -- All DOE Office Websites (Extended Search)

Experience with Validating MHK Tools Experience with Validating MHK Tools National Renewable Energy Laboratory - Broomfield, CO - July 9 th 2012 Contents * Overview of GL Garrad Hassan * List of Tools/Core Expertise: Dedicated Software * Waves: Resource assessment and site data analysis * WaveDyn: WEC performance and loads calculation (time-domain) * WaveFarmer: Planning and optimization of a WEC array * Tides: Resource assessment and site data analysis * Tidal Bladed: Tidal Turbine performance and loads calculation (time-domain) * TidalFarmer: Planning and optimization of a tidal turbine array * Validation Experience * Tidal Bladed * ReDAPT * PerAWaT * WaveDyn Who are GL Garrad Hassan? * Industry-leading independent renewable energy consultancy * Established in 1984 * Over 950 full time staff, in 42 locations, across 24 countries worldwide

70

Draft Site-Wide EIS on the Continued Operation of the Los Alamos National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Resources Water Resources A-1 APPENDIX A WATER RESOURCES A.1 SURFACE WATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM VOLUMES One of the primary sources of potential impacts to surface water at the Los Alamos National Laboratory (LANL) is the National Pollutant Discharge Elimination System (NPDES) outfalls. NPDES outfall flow projections were prepared by alternative. Table A.1-1 identifies each industrial outfall by facility, outfall number, and watershed. The index discharge as of August 1996 is also presented along with outfall projections for each alternative. A.2 GROUNDWATER HYDRAULIC PROPERTIES The nature and extent of groundwater bodies in the LANL region has not been fully characterized. To better understand the hydrogeologic characterization of Pajarito Plateau, LANL personnel have prepared a draft

71

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA For Participants in the LANS Defined Benefit Pension Plan  

E-Print Network (OSTI)

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA April for DOE/NNSA Summary of Funding Status LANS and the Department of Energy (DOE) take the funding

72

U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA  

E-Print Network (OSTI)

U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA Slide 1 Operated by the Los Alamos National Security, LLC for the DOE/NNSA Slide 2 · General information on Fusion National Security, LLC for the DOE/NNSA Slide 3 Fusion Energy Sciences (FES) Priorities at LANL: ·Three

73

Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D  

E-Print Network (OSTI)

Slide 1 Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D Materials National Security, LLC for NNSA U N C L A S S I F I E D Outline MYRRHA design (brief) MYRRHA materials Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D Sub-critical reactor

McDonald, Kirk

74

Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations  

SciTech Connect

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

Makarov, Yuri V.; Huang, Zhenyu; Etingov, Pavel V.; Ma, Jian; Guttromson, Ross T.; Subbarao, Krishnappa; Chakrabarti, Bhujanga B.

2010-09-01T23:59:59.000Z

75

Unit Operational Flexibility: Low-Load Turndown of a Large Supercritical Boiler  

Science Conference Proceedings (OSTI)

Power plants must be able to match their output with system demand, which varies with the season and, more important, with the time of the day. Additionally, the variable nature of many renewable generation assets places flexibility pressure on traditional generation.BackgroundEPRI has a history of investigating off-design operation of power plants dating back more than 30 years. The issues surrounding variable pressure operation (VPO) are well understood; ...

2013-12-20T23:59:59.000Z

76

Permanent Peak Load Shift Product Deployment for Smart Grid Integration and Operation  

Science Conference Proceedings (OSTI)

This project tested and evaluated an innovative energy storage technology that provides permanent peak load shifting using electro-thermal energy storage in combination with commercial unitary rooftop air conditioning systems. Four Ice Bear 30 units were deployed at a Staples facility to store an estimated 32 kWh each of energy in 10 off-peak hours and reduce an estimated 5 kW of site energy demand for an on-peak six-hour period. The Ice Bear units are monitored and controlled with a smart grid ...

2012-11-14T23:59:59.000Z

77

Notice of Intent to Prepare an Environmental Impact Statement for the Operation of a Biosafety Level 3 Facility at Los Alamos National Laboratory, Los Alamos, NM (DOE/EIS-0388) (11/29/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90 Federal Register 90 Federal Register / Vol. 70, No. 228 / Tuesday, November 29, 2005 / Notices DEPARTMENT OF ENERGY National Nuclear Security Administration Notice of Intent To Prepare an Environmental Impact Statement for the Operation of a Biosafety Level 3 Facility at Los Alamos National Laboratory, Los Alamos, NM AGENCY: Department of Energy, National Nuclear Security Administration. ACTION: Notice of intent. SUMMARY: The National Nuclear Security Administration (NNSA), an agency within the U.S. Department of Energy (DOE), announces its intent to prepare an Environmental Impact Statement (EIS) to evaluate the operation of a Biosafety Level 3 Facility (BSL-3 Facility) at the Los Alamos National Laboratory (LANL) in Los Alamos, New Mexico. This EIS is being prepared and considered in accordance

78

Diploma Thesis Optimal Operation of a Hydroelectric Power System Subject to Stochastic Inflows and Load  

E-Print Network (OSTI)

Optimal scheduling of hydro-thermal power plants is crucial for economical electricity production. In this diploma thesis, a stochastic programming approach is used to find optimal scheduling policies in terms of minimal production cost. Stochasticity from water inflows and energy load is included in the model. The problems are approximated by the Sample Average Approximation (SAA) method and solved using a nested decomposition procedure. The precision of the solution is assessed in terms of confidence bounds computed with help of the SAA samples. Acknowledgments I would like to thank my supervisor Kristian Nolde and Andreas Poncet from ABB Corporate Research for the challenging discussion about the modelling problem. I owe many thanks to Jonas Nart, who gave mindful criticism and pointed out many inconsistencies during the writing of this thesis. Of course, any deficiencies are completely

Markus Uhr; Supervisor Kristian Nolde; Prof Dr; M. Morari

2006-01-01T23:59:59.000Z

79

Experimental performance verification of a coil-type liquid desiccant system at part-load operation  

SciTech Connect

An experimental study was conducted to compare the predicted performance of a commercially available coil type liquid desiccant cooling and dehumidification system with the experimental results at part-load conditions. A mathematical model was used to predict the performance of coil type liquid desiccant system. This model was based mostly on the manufacturer's catalog data. The coil type system used in the experimental study was a system manufactured in the US. The system is commercially available as 200-10 KXCb, 10-row deep conditioner unit with a design air flow rate of 1180 1/s(2500 scfm). For regeneration of the solution, a packed type 3.0-P regenerator unit with a design air flow rate of 448.4 1/s(950 scfm) was used.

Khan, A.Y. (Univ. of Puerto Rico, Mayaguez (Puerto Rico)); Ball, H.D. (Kansas State Univ., Manhattan, KS (United States))

1993-11-01T23:59:59.000Z

80

Integrating UF6 Cylinder RF Tracking With Continuous Load Cell Monitoring for Verifying Declared UF6 Feed and Withdrawal Operations Verifying Declared UF6 Feed and Withdrawal Operations  

SciTech Connect

Oak Ridge National Laboratory is demonstrating the integration of UF6 cylinder tracking, using RF technology, with continuous load cell monitoring (CLCM) at mock UF6 feed and withdrawal (F&W) stations. CLCM and cylinder tracking are two of several continuous-monitoring technologies that show promise in providing integrated safeguards of F&W operations at enrichment plants. Integrating different monitoring technologies allows advanced, automated event processing to screen innocuous events thereby minimizing false alerts to independent inspectors. Traditionally, international inspectors rely on batch verification of material inputs and outputs derived from operator declarations and periodic on-site inspections at uranium enrichment plants or other nuclear processing facilities. Continuously monitoring F&W activities between inspections while providing filtered alerts of significant operational events will substantially increase the amount of valuable information available to inspectors thereby promising to enhance the effectiveness of safeguards and to improve efficiency in conducting on-site inspections especially at large plants for ensuring that all operations are declared.

Krichinsky, Alan M [ORNL; Miller, Paul [ORNL; Pickett, Chris A [ORNL; Richardson, Dave [ORNL; Rowe, Nathan C [ORNL; Whitaker, J Michael [ORNL; Younkin, James R [ORNL

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Results of Continuous Load Cell Monitoring Field Trial for UF6 Withdrawals at an Operating Industrial Plant  

Science Conference Proceedings (OSTI)

Continuous load cell monitoring (CLCM) has been implemented and tested for use as a safeguards tool during a 2009 field trial in an operating UF6 transfer facility. The transfer facility is part of the Portsmouth Gaseous Diffusion Plant in Piketon, Ohio, operated by the United States Enrichment Corporation. During the field trial, two process scales for UF{sub 6} cylinders were continuously monitored for a 6-month period as cylinders were being filled. The collected CLCM data were used in testing an event processor serving as a filter for highlighting measurements representing significant operational activities that are important in verifying declared operations. The collection of CLCM data, coupled with rules-based event processing, can provide inspectors with knowledge of a facility's feed and withdrawal activities occurring between site visits. Such process knowledge promises to enhance the effectiveness of safeguards by enabling inspectors to quantitatively compare declared activities directly with process measurements. Selected results of the field trial and event processing will be presented in the context of their value to an independent inspector and a facility operator.

Krichinsky, Alan M [ORNL; Bell, Lisa S [ORNL; Conchewski, Curtis A [ORNL; Peters, Benjamin R [ORNL; Pickett, Chris A [ORNL; Richardson, Dave [ORNL; Rowe, Nathan C [ORNL; Younkin, James R [ORNL

2010-01-01T23:59:59.000Z

82

Development and extended operation of a high power radiation loaded heat pipe  

SciTech Connect

A high temperature, high power molybdenum-lithium heat pipe has been fabricated and tested at 1500 K for 1700 hours with radiant heat rejection. Power throughput during the test was approximately 14 kW, corresponding to an axial flux density of 11 kW/cm/sup 2/ for the 1.59 cm diameter heat pipe. Radial flux density was 70 W/cm/sup 2/ over an evaporator length of 40.0 cm. Condenser length was approximately 150 cm with radiant heat rejection from the condenser to a coaxial water cooled radiation calorimeter. A plasma sprayed, high emissivity coating was used on the condenser surface to increase the radiant heat rejection during the tests. The heat pipe was operated for 514 hours at steady state conditions before being damaged during a planned shutdown for test equipment maintenance. The damage was repaired and the initial 1000 hour test period completed without further incident. After physical examination of the heat pipe at 1000 hours the test was resumed and the heat pipe operated at the same conditions for an additional 700 hours before conclusion of this test phase.

Merrigan, M.A.; Keddy, E.S.; Runyan, J.R.; Martinez, H.E.

1984-06-01T23:59:59.000Z

83

DOE/EIS-0380: 2008 Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory Mitigation Action Plan (December 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title: Title: 2008 Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan U.S. Department of Energy Date: December 2008 Los Alamos National Laboratory, an affirmative action/equal opportunity employer, is operated by the Los Alamos National Security, LLC for the National Nuclear Security Administration of the U.S. Department of Energy under contract DE-AC52-06NA25396. By acceptance of this article, the publisher recognizes that the U.S. Government retains a nonexclusive, royalty-free license to publish or reproduce the published form of this contribution, or to allow others to do so, for U.S. Government purposes. Los Alamos National Laboratory requests that the publisher identify this

84

Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E DOperated by Los Alamos National Security, LLC for NNSA Biofuels Research Investments  

E-Print Network (OSTI)

Alamos National Security, LLC for NNSA Biofuels Research Investments Slide 1 José Olivares Biofuels) Aviation (jet fuel) 25 bgy 140 bgy 43 bgy US Focus Cellulosic Ethanol RD&D Advanced Biofuels R Algal Biofuels R&D #12;Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D

California at Davis, University of

85

Direct participation of electrical loads in the California independent system operator markets during the Summer of 2000  

SciTech Connect

California's restructured electricity markets opened on 1 April 1998. The former investor-owned utilities were functionally divided into generation, transmission, and distribution activities, all of their gas-fired generating capacity was divested, and the retail market was opened to competition. To ensure that small customers shared in the expected benefit of lower prices, the enabling legislation mandated a 10% rate cut for all customers, which was implemented in a simplistic way that fossilized 1996 tariff structures. Rising fuel and environmental compliance costs, together with a reduced ability to import electricity, numerous plant outages, and exercise of market power by generators drove up wholesale electricity prices steeply in 2000, while retail tariffs remained unchanged. One of the distribution/supply companies entered bankruptcy in April 2001, and another was insolvent. During this period, two sets of interruptible load programs were in place, longstanding ones organized as special tariffs by the distribution/supply companies and hastily established ones run directly by the California Independent System Operator (CAISO). The distribution/supply company programs were effective at reducing load during the summer of 2000, but because of the high frequency of outages required by a system on the brink of failure, customer response declined and many left the tariff. The CAISO programs failed to attract enough participation to make a significant difference to the California supply demand imbalance. The poor performance of direct load participation in California's markets reinforces the argument for accurate pricing of electricity as a stimulus to energy efficiency investment and as a constraint on market volatility.

Marnay, Chris; Hamachi, Kristina S.; Khavkin, Mark; Siddiqui, Afzal S.

2001-04-01T23:59:59.000Z

86

SINGLE-SHELL TANK INTEGRITY PROJECT ANALYSIS OF RECORD-PRELIMINARY MODELING PLAN FOR THERMAL AND OPERATING LOADS  

SciTech Connect

This document is a Phase I deliverable for the Single-Shell Tank Analysis of Record effort. This document is not the Analysis of Record. The intent of this document is to guide the Phase II detailed modeling effort. Preliminary finite element models for each of the tank types were developed and different case studies were performed on one or more of these tank types. Case studies evaluated include thermal loading, waste level variation, the sensitivity of boundary effects (soil radial extent), excavation slope or run to rise ratio, soil stratigraphic (property and layer thickness) variation at different farm locations, and concrete material property variation and their degradation under thermal loads. The preliminary analysis document reviews and preliminary modeling analysis results are reported herein. In addition, this report provides recommendations for the next phase of the SST AOR project, SST detailed modeling. Efforts and results discussed in this report do not include seismic modeling as seismic modeling is covered by a separate report. The combined results of both static and seismic models are required to complete this effort. The SST AOR project supports the US Department of Energy's (DOE) Office of River Protection (ORP) mission for obtaining a better understanding of the structural integrity of Hanford's SSTs. The 149 SSTs, with six different geometries, have experienced a range of operating histories which would require a large number of unique analyses to fully characterize their individual structural integrity. Preliminary modeling evaluations were conducted to determine the number of analyses required for adequate bounding of each of the SST tank types in the Detailed Modeling Phase of the SST AOR Project. The preliminary modeling was conducted in conjunction with the Evaluation Criteria report, Johnson et al. (2010). Reviews of existing documents were conducted at the initial stage of preliminary modeling. These reviews guided the topics that were explored in the SST preliminary modeling. The reviews determined the level of detail necessary to perform the analyses of the SSTs. To guide the Phase II detailed modeling effort, preliminary finite element models for each of the tank types were developed and different case studies were performed on one or more of these tank types. Case studies evaluated include thermal loading, waste level variation, the sensitivity of boundary effects (soil radial extent), excavation slope or run to rise ratio, soil stratigraphic (property and layer thickness) variation at different farm locations, and concrete material property variation and their degradation under thermal loads. Conclusions were derived from case studies on one of the tank types when no additional runs of similar cases on other types of tanks were found necessary to derive those conclusions. The document reviews provided relatively complete temperature histories for Type IV tanks. The temperature history data for Type I, II, and III tanks was almost nonexistent for years prior to 1975. Document reviews indicate that there might be additional useful data in the US Department of Energy, Richland Operations Office (DOE-RL) records in Seattle, WA, and these records need to be reviewed to extract data that might have been disregarded during previous reviews. Thermal stress analyses were conducted using different temperature distribution scenarios on Type IV tanks. Such studies could not be carried out for other tank types due to lack of temperature history data. The results from Type IV tank analyses indicate that factors such as temperature distribution in the tank waste and rate of rise in waste temperature have a significant impact on the thermal stresses in the tank structures. Overall, the conclusion that can drawn from the thermal stress analyses is that these studies should be carried out for all tank types during the detailed analysis phase with temperature values that are reasonably close to the typical temperature histories of the respective tank types. If and/or when additional waste temperature data

RAST RS; RINKER MW; BAPANAALLI SK; DEIBLER JE; GUZMAN-LEONG CE; JOHNSON KI; KARRI NK; PILLI SP; SANBORN SE

2010-10-22T23:59:59.000Z

87

HANFORD DOUBLE SHELL TANK THERMAL AND SEISMIC PROJECT SUMMARY OF COMBINED THERMAL AND OPERATING LOADS WITH SEISMIC ANALYSIS  

SciTech Connect

This report summarizes the results of the Double-Shell Tank Thermal and Operating Loads Analysis (TaLA) combined with the Seismic Analysis. This combined analysis provides a thorough, defensible, and documented analysis that will become a part of the overall analysis of record for the Hanford double-shell tanks (DSTs). The bases of the analytical work presented herein are two ANSYS{reg_sign} finite element models that were developed to represent a bounding-case tank. The TaLA model includes the effects of temperature on material properties, creep, concrete cracking, and various waste and annulus pressure-loading conditions. The seismic model considers the interaction of the tanks with the surrounding soil including a range of soil properties, and the effects of the waste contents during a seismic event. The structural evaluations completed with the representative tank models do not reveal any structural deficiencies with the integrity of the DSTs. The analyses represent 60 years of use, which extends well beyond the current date. In addition, the temperature loads imposed on the model are significantly more severe than any service to date or proposed for the future. Bounding material properties were also selected to provide the most severe combinations. While the focus of the analyses was a bounding-case tank, it was necessary during various evaluations to conduct tank-specific analyses. The primary tank buckling evaluation was carried out on a tank-specific basis because of the sensitivity to waste height, specific gravity, tank wall thickness, and primary tank vapor space vacuum limit. For this analysis, the occurrence of maximum tank vacuum was classified as a service level C, emergency load condition. The only area of potential concern in the analysis was with the buckling evaluation of the AP tank, which showed the current limit on demand of l2-inch water gauge vacuum to exceed the allowable of 10.4 inches. This determination was based on analysis at the design waste temperature of 350 F and the full 60-year corrosion allowance on the tank wall of 0.060 inch. However, analysis at a more realistic temperature of 250 F or corrosion allowance of 0.025 inch results in an acceptable demand/capacity ratio according to the ASME code criteria. Thus, buckling of the primary tank is judged to be unlikely for the current lack of corrosion in the tanks, and the expectation that the maximum waste temperature will not exceed 210 F. The reinforced concrete structure was evaluated as specified by the American Concrete Institute (ACI) code requirements for nuclear safety-related structures (ACI-349). The demand was demonstrated to be lower than the capacity at all locations. Revision 1 is being issued to document changes to the anchor bolt evaluation. RPP-RPT-32237 Rev. 1, Hanford Double-Shell Tank Thermal and Seismic Project-Increased Liquid Level Analysis for 241AP Tank Farms, described changes to the anchor bolt modeling and evaluation which were implemented in response to the independent reviewer's comments. Similar changes have been made in the bounding tank analysis and are documented in RPP-RPT-28968 Rev. 1. The conclusions of the previous releases of this report remain unchanged.

MACKEY TC; DEIBLER JE; RINKER MW; JOHNSON KI; ABATT FG; KARRI NK; PILLI SP; STOOPS KL

2009-01-15T23:59:59.000Z

88

Fuel Effects on Combustion and Emissions of a Direct-Inection Diesel Engine Operating at Moderate to High Engine Speed and Load  

Science Conference Proceedings (OSTI)

It is advantageous to increase the specific power output of diesel engines and to operate them at higher load for a greater portion of a driving cycle to achieve better thermal efficiency and thus reduce vehicle fuel consumption. Such operation is limited by excessive smoke formation at retarded injection timing and high rates of cylinder pressure rise at more advanced timing. Given this window of operation, it is desired to understand the influence of fuel properties such that optimum combustion performance and emissions can be retained over the range of fuels commonly available in the marketplace. It has been shown in previous studies that varying cetane number (CN) of diesel fuel has little effect on ignition delay at high engine load due to the domination of high cylinder temperature on ignition kinetics. The work here experimentally confirms that finding but also shows that emissions and combustion performance vary according to fuel reactivity. Data are examined from a direct-injection single cylinder research engine for eight common diesel fuels including soy-based biodiesel blends at two high load operating points with no exhaust gas recirculation (EGR) and at a moderate load with four levels of EGR. It is shown in the work that at high engine load where combustion is controlled by mixing processes, CN and other fuel properties have little effect on engine performance, although lower CN fuels produce a small increase in noise, smoke and CO emissions. Biodiesel blends increase NOX emissions and decreases CO and smoke emissions at high load, but otherwise have little effect on performance. At moderate load, higher CN fuels are more tolerant to EGR due to their better chemical reactivity at retarded injection timing, but all fuels produce comparable thermal efficiency at advanced combustion phasing regardless of EGR. In contrast to the high load conditions, there was no increase in NOX emissions for biodiesel at the moderate load condition. It is concluded that although higher CN does not significantly alter ignition delay at moderate to high loads it has a dominant influence on the acceptable injection timing range. Apart from CN effects, fuel oxygen content plays an independent role in reducing some emissions. It is therefore recommended that compensation for fuel ignitability and oxygen content be included in combustion control strategies to optimize emissions and performance of future diesel engines.

Szybist, James P [ORNL; Szymkowicz, Patrick G. [General Motors Corporation; Northrop, William F [General Motors Corporation

2012-01-01T23:59:59.000Z

89

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I E D Slide 1  

E-Print Network (OSTI)

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I E D;Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I

90

Extension of Comment Period on the Draft Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, NM (DOE/EIS-0380) (08/31/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Federal Register 10 Federal Register / Vol. 71, No. 169 / Thursday, August 31, 2006 / Notices Coordinator, at the address and phone number listed above. Issued at Washington, DC on August 24, 2006. Carol Matthews, Acting Advisory Committee Management Officer. [FR Doc. 06-7304 Filed 8-30-06; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY National Nuclear Security Administration Extension of Comment Period on the Draft Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, NM AGENCY: U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). ACTION: Notice of comment period extension. SUMMARY: On July 7, 2006, NNSA published a Notice of Availability for the Draft Site-wide Environmental

91

Fuel Cell Technologies Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D  

E-Print Network (OSTI)

Fuel Cell Technologies Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E Security, LLC for NNSA U N C L A S S I F I E D Fuel Cell Technologies Objectives Develop a ceramic National Security, LLC for NNSA U N C L A S S I F I E D Fuel Cell Technologies Technical Targets

92

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I E D  

E-Print Network (OSTI)

Slide 1 Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I E D Intermediate valence metals Security, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I E D Anderson Impurity Model (AIM

Lawrence, Jon

93

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I E D  

E-Print Network (OSTI)

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L.S. Department of Energy's NNSA U N C L A S S I F I E D Construction Forum Objectives Share LANL planning of Energy's NNSA U N C L A S S I F I E D Major Projects-Near Concurrent Activities Chemistry & Metallurgy

94

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I E D  

E-Print Network (OSTI)

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I E D Construction Forum Objectives.S. Department of Energy's NNSA U N C L A S S I F I E D Major Projects Near Concurrent Activities Slide 3 2010

95

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Solar Power  

E-Print Network (OSTI)

Power Executive Overview: The rising total cost of energy is fueling new markets for solar power. Los Alamos National Laboratory (LANL) is now offering its extensive port- folio of solar power technology for licensing and collaboration. The LANL solar power portfolio includes breakthrough technologies

96

Finding of No Significant Impact for the Proposed Issuance of an Easement to the Public Service Company of New Mexico for the Construction and Operation of a 12-inch Natural Gas Pipeline Within Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Nuclear Security Administration Finding of No Significant Impact for the Proposed Issuance of an Easement to the Public Service Company of New Mexico for the Construction and Operation of a 120inch Natural Gas Pipeline Within Los Alamos National Laboratory, Los Alamos, New Mexico U. S. Department of Energy National Nuclear Security Administration Office of Los Alamos Site Operations 528 35th Street Los Alamos, NM 87544 DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECUIRTY ADMINISTRATION FINDING OF NO SIGNIFICANT IMPACT Proposed Issuance of an Easement to the Public Service Company of New Mexico for the Construction and Operation of a 12-inch Natural Gas Pipeline within Los Alamos National Laboratory, Los Alamos, New Mexico FINAL ENVIRONMENTAL ASSESSMENT: The Environmental Assessment (EA) for the

97

Direct Participation of Electrical Loads in the California Independent System Operator Markets During the Summer of 2000  

E-Print Network (OSTI)

...................................9 Figure 6. Auction Prices of RECLAIM Trading Credits for NOx.S. RECLAIM: program of emissions trading in the Los Angeles area RTC: RECLAIM Trading Credit, pollution in Figure 6. These credits are know as RECLAIM Trading Credits (RTC's), RECLAIM being the name

98

Preliminary volcanic hazards evaluation for Los Alamos National Laboratory Facilities and Operations : current state of knowledge and proposed path forward  

SciTech Connect

The integration of available information on the volcanic history of the region surrounding Los Alamos National Laboratory indicates that the Laboratory is at risk from volcanic hazards. Volcanism in the vicinity of the Laboratory is unlikely within the lifetime of the facility (ca. 50–100 years) but cannot be ruled out. This evaluation provides a preliminary estimate of recurrence rates for volcanic activity. If further assessment of the hazard is deemed beneficial to reduce risk uncertainty, the next step would be to convene a formal probabilistic volcanic hazards assessment.

Keating, Gordon N.; Schultz-Fellenz, Emily S.; Miller, Elizabeth D.

2010-09-01T23:59:59.000Z

100

LOADING DEVICE  

DOE Patents (OSTI)

A device is presented for loading or charging bodies of fissionable material into a reactor. This device consists of a car, mounted on tracks, into which the fissionable materials may be placed at a remote area, transported to the reactor, and inserted without danger to the operating personnel. The car has mounted on it a heavily shielded magazine for holding a number of the radioactive bodies. The magazine is of a U-shaped configuration and is inclined to the horizontal plane, with a cap covering the elevated open end, and a remotely operated plunger at the lower, closed end. After the fissionable bodies are loaded in the magazine and transported to the reactor, the plunger inserts the body at the lower end of the magazine into the reactor, then is withdrawn, thereby allowing gravity to roll the remaining bodies into position for successive loading in a similar manner.

Ohlinger, L.A.

1958-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I E DLA-UR-11-04739  

E-Print Network (OSTI)

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L;Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I E DLA-UR-11-04739 General Ground

102

An analytical study and systematic monitoring procedure developed for the load-out operation of the North Rankin Jacket 'A'  

SciTech Connect

The loadout of the 22,000 tonnes North Rankin Jacket 'A' onto a floating barge was successfully accomplished in April, 1982. During the loadout the barge ballast was continually adjusted to compensate for both jacket weight transfer onto the barge and full tide variation. The preparation for the loadout and the operation itself was characterized by newly developed integrated techniques. The techniques included: the development of a barge, jacket and quayside three-dimensional computer model to check the validity of conventional and simple ballast system software. The model was also used to evaluate the control parameters of the operation in a series of analyses which determine the sensitivity of critical steps of the operation to human or equipment errors: the development and operation of an integrated control system for jacket load transfer that relates jacket position to barge level and ballast pump requirements; the development and operation of a tide-expectation computer programme and associated ballast pump time scheduling software to compensate for differences between actual water level and that determined from standard tide tables, and to minimize the effect of short-term, local tide variations that are not forecast; and the incorporation of fail-safe concepts and measures into the operation.

Ferguson, N.; Inokoshi, O.; Kitani, T.; Masuda, S.; Zarate, H.

1983-05-01T23:59:59.000Z

103

EVIDENCE OF TWO EXTREME FLOW REGIMES OPERATING I N THE PRODUCTION ZONE OF DIFFERENT WELLS FROM LOS AZUFRES  

SciTech Connect

A published method for calculating excess steam is modified in order to make it applicable to the case of a well producing fluid with a high non-condensable gas content. The method is applied to data from a number of wells from Los Azufres. The results show the expected linear relation between excess steam and the molar fraction of CO{sub 2} in the total discharge. The modified method also provides an estimate for the molar fraction of CO{sub 2} in the liquid phase of the reservoir. It is found that this concentration is relatively homogeneous in the southern section of the field, and seems to be slightly smaller in the deeper zones of the northern section. The calculated values of excess steam agree qualitatively, but not quantitatively, with values of steam quality in the undisturbed reservoir calculated by other authors. The calculation of excess steam tends to overestimate steam quality in cases where steam saturation in the reservoir is low, and has the opposite tendency when the steam quality in the reservoir is high. The first type of deviation is explained in terms of the effects of higher mobility of steam in the two-phase zone induced by pressure drawdown. The second type of deviation is explained as the result of boiling of liquid phase, and the consequent addition of (non-condensable) gas-poor steam to the flowing mass, also caused by the pressure drawdown. A necessary extension of the reasoning leading to these explanations, is the prediction that the non-condensable gas content in fluids produced from a reservoir with a high steam saturation, will either remain stable or decrease with time during exploitation.

Nieva, D.; Gonzales, J.; Garfias, A.

1985-01-22T23:59:59.000Z

104

LOADED WAVEGUIDES  

DOE Patents (OSTI)

>Loaded waveguides are described for the propagation of electromagnetic waves with reduced phase velocities. A rectangular waveguide is dimensioned so as to cut-off the simple H/sub 01/ mode at the operating frequency. The waveguide is capacitance loaded, so as to reduce the phase velocity of the transmitted wave, by connecting an electrical conductor between directly opposite points in the major median plane on the narrower pair of waveguide walls. This conductor may take a corrugated shape or be an aperature member, the important factor being that the electrical length of the conductor is greater than one-half wavelength at the operating frequency. Prepared for the Second U.N. International ConferThe importance of nuclear standards is duscussed. A brief review of the international callaboration in this field is given. The proposal is made to let the International Organization for Standardization (ISO) coordinate the efforts from other groups. (W.D.M.)

Mullett, L.B.; Loach, B.G.; Adams, G.L.

1958-06-24T23:59:59.000Z

105

Los Alamos Lab: Technology Transfer | Home Page  

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA. Inside | © Copyright 2010-11 Los Alamos National Security, ...

106

An Equal Opportunity Employer / Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA Los Alamos National Laboratory Fellows Position on the University of  

E-Print Network (OSTI)

.S. Department of Energy's NNSA Los Alamos National Laboratory Fellows Position on the University of California Security, LLC for the U.S. Department of Energy's NNSA technical progress, or to the threat, whether

107

Load cell  

DOE Patents (OSTI)

A load cell combines the outputs of a plurality of strain gauges to measure components of an applied load. Combination of strain gauge outputs allows measurement of any of six load components without requiring complex machining or mechanical linkages to isolate load components. An example six axis load cell produces six independent analog outputs, each directly proportional to one of the six general load components. 16 figs.

Spletzer, B.L.

1998-12-15T23:59:59.000Z

108

Load cell  

DOE Patents (OSTI)

A load cell combines the outputs of a plurality of strain gauges to measure components of an applied load. Combination of strain gauge outputs allows measurement of any of six load components without requiring complex machining or mechanical linkages to isolate load components. An example six axis load cell produces six independent analog outputs which can be combined to determine any one of the six general load components.

Spletzer, Barry L. (Albuquerque, NM)

2001-01-01T23:59:59.000Z

109

Load cell  

DOE Patents (OSTI)

A load cell combines the outputs of a plurality of strain gauges to measure components of an applied load. Combination of strain gauge outputs allows measurement of any of six load components without requiring complex machining or mechanical linkages to isolate load components. An example six axis load cell produces six independent analog outputs, each directly proportional to one of the six general load components.

Spletzer, Barry L. (Albuquerque, NM)

1998-01-01T23:59:59.000Z

110

SUMMARY REPORT ON INSPECTION OF ALLEGATIONSRELATING TO THE ALBUQUERQUE OPERATIONS OFFICESECURITY SURVEY PROCESS AND THE SECURITY OPERATIONS’SELF-ASSESSMENTS AT LOS ALAMOS NATIONAL LABORATORY, DOE/IG-0471  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Inspector General received allegations regarding the conduct of security reviews at the Department of Energy’s (DOE) Los Alamos National Laboratory (LANL). Specifically, it was...

111

Notice of Availability of the Draft Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, NM (DOE/EIS-0380D) (07/07/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

638 Federal Register 638 Federal Register / Vol. 71, No. 130 / Friday, July 7, 2006 / Notices 1 Northern Natural Gas Company, 115 FERC ¶ 61,254 (2006). 1 Pinnacle West Capital Corp., 115 FERC ¶ 61,292 (2006). DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP06-332-000] Northern Natural Gas Company; Notice of Technical Conference June 28, 2006. The Federal Energy Regulatory Commission will convene a technical conference regarding Northern Natural Gas Company's proposal to adjust the boundary of its Operational Zones ABC and EF to the Iowa/Minnesota border in order to provide that delivery points in northern Iowa currently located in Operational Zone EF be moved to Operational Zone ABC, and delivery points in southwestern Minnesota currently located in Operational Zone

112

Los Alamos National Laboratory | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Laboratory Los Alamos National Laboratory Los Alamos National Laboratory Los Alamos National Laboratory At Los Alamos National Laboratory, $94 million in Recovery Act funding is being used to clean up the Lab’s oldest waste disposal site, Material Disposal Area B (MDA-B), which was used from 1944 to 1948 At Los Alamos National Laboratory, $94 million in Recovery Act funding is being used to clean up the Lab's oldest waste disposal site, Material Disposal Area B (MDA-B), which was used from 1944 to 1948 Employees load transuranic waste into a shipping container at Vallecitos Nuclear Center Employees load transuranic waste into a shipping container at Vallecitos Nuclear Center Los Alamos National Laboratory At Los Alamos National Laboratory, $94 million in Recovery Act funding is being used to clean up the Lab's oldest waste disposal site, Material Disposal Area B (MDA-B), which was used from 1944 to 1948

113

Los Alamos test-room results  

DOE Green Energy (OSTI)

Fourteen Los Alamos test rooms have been operated for several years; this paper covers operation during the winters of 1980-81 and 1981-82. Extensive data have been taken and computer analyzed to determine performance parameters such as efficiency, solar savings fraction, and comfort index. The rooms are directly comparable because each has the same net coefficient and solar collection area and thus the same load collector ratio. Configurations include direct gain, unvented Trombe walls, water walls, phase change walls, and two sunspace geometries. Strategies for reducing heat loss include selective surfaces, two brands of superglazing windows, a heat pipe system, and convection-suppression baffles. Significant differences in both backup heat and comfort are observed among the various rooms. The results are useful, not only for direct room-to-room comparisons, but also to provide data for validation of computer simulation programs.

McFarland, R.D.; Balcomb, J.D.

1982-01-01T23:59:59.000Z

114

Load Forecasting for Modern Distribution Systems  

Science Conference Proceedings (OSTI)

Load forecasting is a fundamental activity for numerous organizations and activities within a utility, including planning, operations, and control. Transmission and Distribution (T&D) planning and design engineers use the load forecast to determine whether any changes and additions are needed to the electric system to satisfy the anticipated load. Other load forecast users include system operations, financial ...

2013-03-08T23:59:59.000Z

115

Workforce Statistics - Los Alamos Field Office | National Nuclear...  

National Nuclear Security Administration (NNSA)

Statistics - Los Alamos Field Office Home > About Us > Our Operations > Management and Budget > Office of Civil Rights > Workforce Statistics > Workforce Statistics - Los Alamos...

116

LANL | Partnering | User Facility - Los Alamos National Lab ...  

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA. Inside | © Copyright 2010-11 Los Alamos National Security, ...

117

LANL | TT | License | Software - Los Alamos National Lab: National ...  

Los Alamos National Laboratory • Est 1943 . Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

118

LANL | TT | Awards - Los Alamos National Lab: National Security ...  

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA. Inside | © Copyright 2010-11 Los Alamos National Security, ...

119

LANL | Partnering | Sample Agreements - Los Alamos National Lab ...  

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA. Inside | © Copyright 2010-11 Los Alamos National Security, ...

120

LANL | Technology Transfer | LAVA - Los Alamos National Lab ...  

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA. Inside | © Copyright 2010-11 Los Alamos National Security, ...

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

LANL | Partnering | Agreements - Los Alamos National Lab: National ...  

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA. Inside | © Copyright 2010-11 Los Alamos National Security, ...

122

Comparison of predicted ground-level airborne radionuclide concentrations to measured values resulting from operation of the Los Alamos Meson Physics Facility  

E-Print Network (OSTI)

A comparison study of measured and predicted downwind radionuclide concentrations from the Los Alamos Meson Physics Facility (LAMPF) was performed. The radionuclide emissions consist primarily of the radioisotopes "C, 'IN, and 110. The gases, vented to the outside environment by a stack located at the facility, potentially increase the radiation exposure at the facility boundary. Emission rate, meteorological, and radiation monitoring station data were collected between September 26, 1992 and October 3, 1992. The meteorological and emission data were input to the Clean Air Act Assessment Package-1 988 (CAP88-PC) computer code. The downwind radionuclide air concentrations predicted by the code were compared to the air concentrations measured by the monitoring stations. The code was found to slightly overpredict downwind concentrations during unstable atmospheric conditions. For stable atmospheric conditions, the code was not useful for predicting downwind air concentrations. This is thought to be due to an underestimation of hoizontal dispersion.

Hoak, William Vandergrift

1993-01-01T23:59:59.000Z

123

Operations Information for Studies  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Information for Studies Operations Information for Studies This page contains historical information about hydropower operations. Reclamation UC Region 24-Month Studies FY2009 Load Information (pdf) SLIP total customer loads for Fiscal Year 2009 (Oct, 2008-Sept, 2009) FY2010 Load Information (pdf) SLIP total customer loads for Fiscal Year 2010 (Oct, 2009-Sept, 2010) FY2011 Load Information (pdf) SLIP total customer loads for Fiscal Year 2011 (Oct, 2010-Sept, 2011) FY2012 Load Information (pdf) SLIP total customer loads for Fiscal Year 2012 (Oct, 2011-Sept, 2012) FY2013 Load Information (pdf) SLIP total customer loads for Fiscal Year 2013 (Oct, 2012-Sept, 2013) CRSP Projected Power Releases From USBR (Excel) The most recent file of projected future power releases from CRSP Dams, median projection

124

Materials Capability Review Los Alamos National Laboratory  

E-Print Network (OSTI)

highlights not covered in other themes of the MCR. #12;Operated by Los Alamos National Security, LLC for NNSA F I E D Materials @LANL #12;Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F #12;Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D Materials

125

Load Control  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Visualization and Controls Peer Review Visualization and Controls Peer Review Load Control for System Reliability and Measurement-Based Stability Assessment Dan Trudnowski, PhD, PE Montana Tech Butte, MT 59701 dtrudnowski@mtech.edu 406-496-4681 October 2006 2 Presentation Outline * Introduction - Goals, Enabling technologies, Overview * Load Control - Activities, Status * Stability Assessment - Activities, Status * Wrap up - Related activities, Staff 3 Goals * Research and develop technologies to improve T&D reliability * Technologies - Real-time load control methodologies - Measurement-based stability-assessment 4 Enabling Technologies * Load control enabled by GridWise technology (e.g. PNNL's GridFriendly appliance) * Real-time stability assessment enabled by Phasor Measurement (PMU) technology 5 Project Overview * Time line: April 18, 2006 thru April 17, 2008

126

Industrial Business Development - Los Alamos National Lab ...  

Los Alamos National Laboratory, an af?rmative action/ equal opportunity employer, is operated by the University of California for the U.S. Department of Energy under

127

On-line load relief control  

SciTech Connect

This paper describes the results of an investigation concerning the on-line prediction and enhancement of load relief. The effects of voltage fluctuation, system voltage profile control and generator voltage adjustment on load relief and load shedding operations during under-frequency transients are studied. The technique promoted in the paper may be used to reduce system spinning reserve or prospective load shedding.

Jovanovic, S.; Fox, B.; Thompson, J.G. (Queen' s Univ. of Belfast (United Kingdom))

1994-11-01T23:59:59.000Z

128

Self-aligning biaxial load frame  

DOE Patents (OSTI)

An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed cross head, and by alignment and linear motion elements of one load assembly relative to the load frame. 3 figures.

Ward, M.B.; Epstein, J.S.; Lloyd, W.R.

1994-01-18T23:59:59.000Z

129

MTS Table Top Load frame  

NLE Websites -- All DOE Office Websites (Extended Search)

MTS Table Top Load frame MTS Table Top Load frame The Non-destructive Evaluation group operates an MTS Table Top Load frame for ultimate strength and life cycle testing of various ceramic, ceramic-matrix (FGI), carbon, carbon fiber, cermet (CMC) and metal alloy engineering samples. The load frame is a servo-hydraulic type designed to function in a closed loop configuration under computer control. The system can perform non-cyclic, tension, compression and flexure testing and cyclic fatigue tests. The system is comprised of two parts: * The Load Frame and * The Control System. Load Frame The Load Frame (figure 1) is a cross-head assembly which includes a single moving grip, a stationary grip and LVDT position sensor. It can generate up to 25 kN (5.5 kip) of force in the sample under test and can

130

Building load control and optimization  

E-Print Network (OSTI)

Researchers and practitioners have proposed a variety of solutions to reduce electricity consumption and curtail peak demand. This research focuses on load control by improving the operations in existing building HVAC ...

Xing, Hai-Yun Helen, 1976-

2004-01-01T23:59:59.000Z

131

Definition: Direct Control Load Management | Open Energy Information  

Open Energy Info (EERE)

Control Load Management Jump to: navigation, search Dictionary.png Direct Control Load Management Demand-Side Management that is under the direct control of the system operator....

132

Monitoring of the electrical distribution network operation  

Science Conference Proceedings (OSTI)

Distribution network operation is determined by the behaviour of the load. To plan and analyse the electrical network operation, precise modelling of load is substantial. The adequate approach to understand the electrical distribution network operation ... Keywords: SCADA, busloads, distribution network, load monitoring, mathematical model of load, network operation monitoring, state estimation

Jako Kilter; Mati Meldorf

2009-02-01T23:59:59.000Z

133

The Los Alamos 600 MJ, 1500 MW inertial energy storage and pulsed power unit  

DOE Green Energy (OSTI)

A 1430 MVA synchronous generator from a cancelled nuclear power plant has been installed and commissioned at Los Alamos National Laboratory (LANL) to be used as the pulsed power generator for physics experiments. The generator is mounted on a spring foundation to prevent dynamic forces from being transmitted to the substructure and into the ground. A 6 MW load-commutated inverter drive accelerates the machine from standstill to the maximum operating speed of 1800 rpm and from 1260 rpm to 1800 rpm between load pulses. The generator cooling method has been changed from hydrogen to air cooling to facilitate operation. A current limiting fuse, with a fuse clearing current of 90 kA, will protect the generator output against short circuit currents. An overview of the installation is presented. The paper also addresses the overload capability of the generator for pulsed loads. 7 figs., 1 tab.

Boenig, H.J.

1991-01-01T23:59:59.000Z

136

LANL:CPO: Los Alamos National Laboratory Impacts and Investments in Los Alamos County  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Alamos National Laboratory Impacts and Investments in Los Alamos County Los Alamos National Laboratory Impacts and Investments in Los Alamos County LA-UR 11-02574 (4/25/13) Los Alamos National Laboratory Impacts and Investments in Los Alamos County Los Alamos County is home to 3,772 LANL employees and contractors. As of February 2013, $414,431,455 in annual base salaries was being paid to LANL employees (excluding contractors and craft employees) in Los Alamos County. In FY12, LANL purchased $193,827,533 in products and services from Los Alamos County businesses. Los Alamos is one of seven northern New Mexico counties identified in the Lab's maintenance and operations contract with NNSA that is targeted for education, economic development, and charitable giving programs through the LANS, LLC Community Commitment Plan.

137

Los Alamos National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

employees receive Pollution Prevention employees receive Pollution Prevention Awards April 23, 2013 Protecting environment, saving taxpayer dollars LOS ALAMOS, N.M., April 23, 2013-Nearly 400 Los Alamos National Laboratory employees on 47 teams received Pollution Prevention awards for protecting the environment and saving taxpayers more than $8 million. The employees were recognized at the Laboratory's annual Pollution Prevention Awards ceremony on Monday (April 22), Earth Day. "The Pollution Prevention Awards are the result of people taking the initiative to improve their own operations," said Pat Gallagher of the Laboratory's Environmental - 2 - Stewardship group. "These are clever, innovative, homegrown and home-owned ideas that save the Laboratory and taxpayers millions of dollars each year while reducing

138

Effects of pulsed-power loads upon an electric power grid  

DOE Green Energy (OSTI)

Certain proposed particle-accelerator and laser experiments, and other devices related to fusion research, require multi-megawatt, repetitive power pulses, often at low (subsynchronous) frequency. While some power-delivery technologies call for a certain degree of buffering of the utility demand using capacitive, inductive, or inertial energy storage, considerations have also been made for serving such loads directly from the line. In either case, such pulsed loads represent non-traditional applications from the utility's perspective which, in certain cases, can have significant design and operational implications. This paper outlines an approach to the analysis of the effects of such loads upon the electric power grid using existing analysis techniques. The impacts studied include busvoltage flicker, transient and dynamic stability, and torsional excitation. The impact of a particular pulsed load is examined and illustrated for the power network serving the Los Alamos National Laboratory. 19 refs., 13 figs.

Smolleck, H.A.; Ranade, S.J.; Prasad, N.R. (New Mexico State Univ., Las Cruces, NM (USA). Dept. of Electrical and Computer Engineering); Velasco, R.O. (Los Alamos National Lab., NM (USA))

1990-01-01T23:59:59.000Z

139

Harmonic approaches to non-intrusive load diagnostics  

E-Print Network (OSTI)

The Non-Intrusive Load Monitor (NILM) is a system that monitors, records and processes voltage and current measurements to establish the operating characteristics of individual loads on a load center from a single aggregate ...

Fuller, Ashley E. (Ashley Eliot)

2008-01-01T23:59:59.000Z

140

Los Alamos National Security LLC Selected to Manage Los Alamos National  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Security LLC Selected to Manage Los Alamos Los Alamos National Security LLC Selected to Manage Los Alamos National Laboratory Los Alamos National Security LLC Selected to Manage Los Alamos National Laboratory December 21, 2005 - 4:51pm Addthis WASHINGTON, D.C. - Secretary of Energy Samuel W. Bodman announced today that Los Alamos National Security LLC has been selected to be the management and operations contractor for Los Alamos National Laboratory in New Mexico. Los Alamos National Security LLC is a limited liability corporation made up of Bechtel National, Inc., the University of California, BWX Technologies, Inc., and the Washington Group International, Inc. The laboratory, one of three National Nuclear Security Administration (NNSA) nuclear weapons laboratories, performs sensitive national security

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

Science Conference Proceedings (OSTI)

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

2008-07-01T23:59:59.000Z

142

LANL | TT | R&D 100 Awards | 2003 - Los Alamos National Lab ...  

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA. Inside | © Copyright 2010-11 Los Alamos National Security, ...

143

LANL | TT | R&D 100 Awards | 2007 - Los Alamos National Lab ...  

Los Alamos National Laboratory • Est 1943 . Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

144

LANL | TT | License | MagViz - Los Alamos National Lab: National ...  

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA. Inside | © Copyright 2010-11 Los Alamos National Security, ...

145

High-Power Rf Load  

DOE Patents (OSTI)

A compact high-power RF load comprises a series of very low Q resonators, or chokes [16], in a circular waveguide [10]. The sequence of chokes absorb the RF power gradually in a short distance while keeping the bandwidth relatively wide. A polarizer [12] at the input end of the load is provided to convert incoming TE.sub.10 mode signals to circularly polarized TE.sub.11 mode signals. Because the load operates in the circularly polarized mode, the energy is uniformly and efficiently absorbed and the load is more compact than a rectangular load. Using these techniques, a load having a bandwidth of 500 MHz can be produced with an average power dissipation level of 1.5 kW at X-band, and a peak power dissipation of 100 MW. The load can be made from common lossy materials, such as stainless steel, and is less than 15 cm in length. These techniques can also produce loads for use as an alternative to ordinary waveguide loads in small and medium RF accelerators, in radar systems, and in other microwave applications. The design is easily scalable to other RF frequencies and adaptable to the use of other lossy materials.

Tantawi, Sami G. (San Mateo, CA); Vlieks, Arnold E. (Livermore, CA)

1998-09-01T23:59:59.000Z

146

Los Alamos National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 - Hours after a disaster declaration by Los Alamos County, Los Alamos National Laboratory officials on Friday described "millions" of dollars in damage to environmental...

147

Spinning reserve from hotel load response  

SciTech Connect

Even though preliminary tests were not conducted during times of highest system or hotel loading during the summer, they showed that hotel load can be curtailed by 22 to 37 percent depending on the outdoor temperature and time of day. Full response occurred in 12 to 60 seconds from when the system operator's command to shed load was issued and the load drop was very rapid. (author)

Kirby, Brendan; Kueck, John; Laughner, Theo; Morris, Keith

2008-12-15T23:59:59.000Z

148

Spinning Reserve from Responsive Load  

SciTech Connect

As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host a spinning reserve test. The Tennessee Valley Authority (TVA) supplied real-time metering and monitoring expertise to record total hotel load during both normal operations and testing. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. The load drop was very rapid, essentially as fast as the 2 second metering could detect.

Kueck, John D [ORNL; Kirby, Brendan J [ORNL; Laughner, T [Tennessee Valley Authority (TVA); Morris, K [Tennessee Valley Authority (TVA)

2009-01-01T23:59:59.000Z

149

UNIVERSITY OF CALIFORNIA Los Angeles  

E-Print Network (OSTI)

, and Software 138 9.3 Methodology 138 9.3.1 Calculation of Pollutant Loadings 138 9.3.2 Knowledge and Analysis 53 4.4.1 Reclassification 53 4.4.2 Interpolation 54 4.4.3 Connectivity Operations 54 4.4.4 Neighborhood Operations 55 4.4.5 Measurement 55 4.4.6 Statistical Analysis 57 4.5 References 58 5 Knowledge

Stenstrom, Michael K.

150

Electrical and Production Load Factors  

E-Print Network (OSTI)

Load factors are an important simplification of electrical energy use data and depend on the ratio of average demand to peak demand. Based on operating hours of a facility they serve as an important benchmarking tool for the industrial sector. The operating hours of small and medium sized manufacturing facilities are analyzed to identify the most common operating hour or shift work patterns. About 75% of manufacturing facilities fall into expected operating hour patterns with operating hours near 40, 80, 120 and 168 hours/week. Two types of load factors, electrical and production are computed for each shift classification within major industry categories in the U.S. The load factor based on monthly billing hours (ELF) increases with operating hours from about 0.4 for a nominal one shift operation, to about 0.7 for around-the-clock operation. On the other hand, the load factor based on production hours (PLF) shows an inverse trend, varying from about 1.4 for one shift operation to 0.7 for around-the-clock operation. When used as a diagnostic tool, if the PLF exceeds unity, then unnecessary energy consumption may be taking place. For plants operating at 40 hours per week, the ELF value was found to greater than the theoretical maximum, while the PLF value was greater than one, suggesting that these facilities may have significant energy usage outside production hours. The data for the PLF however, is more scattered for plants operating less than 80 hours per week, indicating that grouping PLF data based on operating hours may not be a reasonable approach to benchmarking energy use in industries. This analysis uses annual electricity consumption and demand along with operating hour data of manufacturing plants available in the U.S. Department of Energy’s Industrial Assessment Center (IAC) database. The annual values are used because more desirable monthly data are not available. Monthly data are preferred as they capture the load profile of the facility more accurately. The data there come from Industrial Assessment Centers which employ university engineering students, faculty and staff to perform energy assessments for small to medium-sized manufacturing plants. The nation-wide IAC program is sponsored by the U.S. Department of Energy.

Sen, Tapajyoti

2009-12-01T23:59:59.000Z

151

LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM  

NLE Websites -- All DOE Office Websites (Extended Search)

LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM NON-EXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between Los Alamos National Security, LLC ("LANS"), under its United States Department of Energy ("DOE") Contract No. DE-AC52-06NA25396, to manage and operate Los Alamos National Laboratory ("LANL"), and ______________________________________, a _____________________________ corporation Company Name ("LICENSEE") (State of Incorporation) having its principal place of business at: ________________________________________________________________________________________ (Company Address) is effective on the date of execution by the last signing Party and payment of the License Issue Fee

152

A Novel Approach to Determining Motor Load  

E-Print Network (OSTI)

Properly sized electric motors are essential if industrial plant efficiency is to be optimized and energy costs minimized. Because of the difficulty in making power measurements on three phase motors, loading is rarely, if ever, checked. A simple indication of motor load can be achieved by measuring operating speed because speed and load are almost linearly related. The decrease in motor speed from no load conditions, referred to as slip, can be determined with a non-contact, optical tachometer. Field measurements of motor slip were conducted at a textile plant to quantify motor load conditions. To verify the relationship between operating speed and load, measurements of motor power consumption on a representative number of motors were also conducted. The results of the motor survey, including number of motors, size, and load, are summarized in this paper along with an estimate of the savings from replacing oversized motors.

Brown, M.

1992-04-01T23:59:59.000Z

153

FY 2011 Los Alamos National Security, LLC, PER Summary | National...  

National Nuclear Security Administration (NNSA)

Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2011 Los Alamos National Security, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project...

154

FY 2012 Los Alamos National Security, LLC, PEP | National Nuclear...  

National Nuclear Security Administration (NNSA)

Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2012 Los Alamos National Security, LLC, PEP Home > About Us > Our Operations > Acquisition and Project Management >...

155

FY 2008 Los Alamos National Security, LLC, PER Summary | National...  

National Nuclear Security Administration (NNSA)

Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2008 Los Alamos National Security, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project...

156

Summer Internships MBA - Los Alamos National Lab: National ...  

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Success Stories Summer InternshipsMBA ” “ each market in which Klimov ...

157

Inspection of Internal Controls Over PersonalComputers at Los...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

used extensively in the full range of operations at the Los Alamos National Laboratory (LANL), including processing classified national security information. LANL reported an...

158

Internal Controls Over Personal Computers at Los Alamos National...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

over the extensive inventory of laptop computers at Los Alamos National Laboratory (LANL). Computers are used in the full range of operations at LANL, to include processing...

159

1994 Pacific Northwest Loads and Resources Study.  

Science Conference Proceedings (OSTI)

The 1994 Pacific Northwest Loads and Resources Study presented herein establishes a picture of how the agency is positioned today in its loads and resources balance. It is a snapshot of expected resource operation, contractual obligations, and rights. This study does not attempt to present or analyze future conservation or generation resource scenarios. What it does provide are base case assumptions from which scenarios encompassing a wide range of uncertainties about BPA`s future may be evaluated. The Loads and Resources Study is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the 1993 Pacific Northwest Loads and Resources Study, published in December 1993. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The Federal system and regional analyses for medium load forecast are presented.

United States. Bonneville Power Administration.

1994-12-01T23:59:59.000Z

160

Periodic load balancing  

Science Conference Proceedings (OSTI)

Multiprocessor load balancing aims to improve performance by moving jobs from highly loaded processors to more lightly loaded processors. Some schemes allow only migration of new jobs upon arrival, while other schemes allow migration of ... Keywords: heavy traffic diffusion approximations, load balancing, periodic load balancing, reflected Brownian motion, resource sharing, transient behavior

Gísli Hjálmtýsson; Ward Whitt

1998-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Los Alamos National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

to 150 million over five years LOS ALAMOS, N.M., May 14, 2013-Los Alamos National Laboratory has awarded a master task order agreement in which three small businesses will...

162

Los Alamos National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

to 400 million over five years LOS ALAMOS, N.M., Sept. 23, 2013-Los Alamos National Laboratory has awarded master task order agreements to three small businesses for environmental...

163

Los Alamos: Sitemap  

NLE Websites -- All DOE Office Websites (Extended Search)

Transfer | Community | Education Programs | Fellows Program History | Life at Los Alamos | National Security | News | Postdocs | Research Library | Strategic Science LANL...

164

Los Alamos National Laboratory | Open Energy Information  

Open Energy Info (EERE)

Los Alamos National Laboratory Los Alamos National Laboratory Name Los Alamos National Laboratory Address P.O. Box 1663 Place Los Alamos, New Mexico Zip 87545 Year founded 1943 Coordinates 35.8849°, -106.3236° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.8849,"lon":-106.3236,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

165

1993 Pacific Northwest Loads and Resources Study.  

SciTech Connect

The Loads and Resources Study is presented in three documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The forecasted future electricity demands -- firm loads -- are subtracted from the projected capability of existing and {open_quotes}contracted for{close_quotes} resources to determine whether Bonneville Power Administration (BPA) and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, and additional conservation, contract purchases, or generating resources will be needed to meet load growth. The Pacific Northwest Loads and Resources Study analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resource in addition to the Federal system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. This study presents the Federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1994--95 through 2003--04.

United States. Bonneville Power Administration.

1993-12-01T23:59:59.000Z

166

Independent Oversight Assessment, Los Alamos National Laboratory - August  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment, Los Alamos National Laboratory - Assessment, Los Alamos National Laboratory - August 2011 Independent Oversight Assessment, Los Alamos National Laboratory - August 2011 August 2011 Facility Centered Assessment of the Los Alamos National Laboratory Science and Technology Operations - Facility Operations Director Managed Facilities This independent review report documents the results of the Office of Health, Safety and Security (HSS) review of the Facility Centered Assessment (FCA) of the Los Alamos National Laboratory (LANL) facilities managed by the Science and Technology Operations (STO) Facility Operations Director (FOD). The independent review of the STO FCA, conducted February 24 through April 1, 2011, was sponsored by the U.S. Department of Energy (DOE) Los Alamos Site Office (LASO) and LANL.

167

NREL: Vehicle Ancillary Loads Reduction - About the Project  

NLE Websites -- All DOE Office Websites (Extended Search)

same effect on fuel cell power sources of the future. The largest ancillary load is the air-conditioning system when it is operating. (Typically it imposes a mechanical load of...

168

Load transfer coupling regression curve fitting for distribution load forecasting  

SciTech Connect

The planning of distribution facilities requires forecasts of future substation and feeder loads. Extrapolation based on a curve fit to past annual peak loads is currently the most popular manner of accomplishing this forecast. Curve fitting suffers badly from data shifts caused by switching as loads are routinely moved from one substation to another during the course of utility operations. This switching contaminates the data, reducing forecast accuracy. A new regression application reduces error due to these transfers by over an order of magnitude. A key to the usefulness of this method is that the amount of the transfer, and its direction (whether it was to or from a substation), is not a required input. The new technique, aspects of computer implementation of it, and a series of tests showing its advantage over normal multiple regression methods are given.

Willis, H.L.; Powell, R.W.

1984-05-01T23:59:59.000Z

169

Battery loading device  

SciTech Connect

A battery loading device for loading a power source battery, built in small appliances having a battery loading chamber for selectively loading a number of cylindrical unit batteries or a one body type battery having the same voltage as a number of cylindrical unit batteries, whereby the one body type battery and the battery loading chamber are shaped similarly and asymmetrically in order to prevent the one body type battery from being inserted in the wrong direction.

Phara, T.; Suzuki, M.

1984-08-28T23:59:59.000Z

170

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

composition: The total load profile obtained from  load individual load types if  load profiles of individual load composition validation: Load profiles generated by the load 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

171

Los Alamos Employees' Scholarship  

NLE Websites -- All DOE Office Websites (Extended Search)

Sixty-five New Mexico students receive Sixty-five New Mexico students receive Los Alamos Employees' Scholarship Fund scholarships May 1, 2012 - 2 - Scholarship campaign begins today for 2013 scholarship awards LOS ALAMOS, New Mexico, May 1, 2012-Sixty-five students from seven Northern New Mexico counties are recipients of Los Alamos Employees' Scholarship Fund scholarships, funded through more than $500,000 in donations from Los Alamos National Laboratory employees and the company that manages the Laboratory. Los Alamos High School senior Scott Carlsten received the top award, the platinum scholarship, which provides $7,500 in financial assistance annually for four years. "I'm very grateful to the Los Alamos National Laboratory Foundation and LANL employees who contributed to make this award possible," said Carlsten. "Being notified

172

Living in Los Alamos  

NLE Websites -- All DOE Office Websites (Extended Search)

Website History & Science Bradbury Science Museum Historical Society Transportation Atomic City Transit LANL Taxi Service (internal) Los Alamos County Airport NMDOT Park &...

173

DOE - Office of Legacy Management -- Los Alamos Underground Med Pipelines -  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Alamos Underground Med Los Alamos Underground Med Pipelines - NM 02 FUSRAP Considered Sites Site: Los Alamos Underground Med Pipelines ( NM.02 ) Eliminated - Remedial action being performed by the Los Alamos Area Office of the DOE Albuquerque Operations Office Designated Name: Not Designated Alternate Name: Los Alamos County Industrial Waste Lines NM.02-1 Location: Los Alamos , New Mexico NM.02-1 Evaluation Year: 1986 NM.02-1 Site Operations: From 1952 to 1965, underground pipelines or industrial waste lines were used at Los Alamos Scientific Laboratory to transport liquid wastes from Technical Areas 1, 3, 48, and 43 to a chemical waste treatment plant (Technical Area 45). NM.02-1 Site Disposition: Eliminated - Remedial action being performed by another DOE office NM.02-1

174

Profile Guided Load Marking for Memory Renaming  

E-Print Network (OSTI)

Memory operations remain a significant bottleneck in dynamically scheduled pipelined processors, due in part to the inability to statically determine the existence of memory address dependencies. Hardware memory renaming techniques have been proposed which predict which stores a load might be dependent upon. These prediction techniques can be used to speculatively forward a value from a predicted store dependency to a load through a value prediction table; however, these techniques require large and time-consuming hardware tables. In this paper we propose a software-guided approach for identifying dependencies between store and load instructions and the Load Marking (LM) architecture to communicate these dependencies to the hardware. Compiler analysis and profiles are used to find important store/load relationships, and these relationships are identified during execution via hints or an n-bit tag. For those loads that are not marked for renaming, we then use additional profiling inform...

Glenn Reinman; Brad Calder; Dean Tullsen; Gary Tyson; Todd Austin

1998-01-01T23:59:59.000Z

175

About Los Alamos Field Office | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Alamos Field Office | National Nuclear Security Administration Los Alamos Field Office | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog About Los Alamos Field Office Home > Field Offices > Welcome to the Los Alamos Field Office > About Los Alamos Field Office About Los Alamos Field Office Los Alamos Field Office in the '50s About Los Alamos Field Office

176

My Documents\\Presentations\\IFE\\NAS\\JCF_IFE_NAS_LANL_V4Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I E D Slide 1  

E-Print Network (OSTI)

for the U.S. Department of Energy's NNSA U N C L A S S I F I E D Slide 1 Prospects for Inertial Fusion\\Presentations\\IFE\\NAS\\JCF_IFE_NAS_LANL_V4Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L, LLC for the U.S. Department of Energy's NNSA U N C L A S S I F I E D Slide 3 LANL fully supports

177

To forecast short-term load in electric power system based on FNN  

Science Conference Proceedings (OSTI)

Electric power system load forecasting plays an important part in the Energy Management System (EMS), which has a great effect on the operating, controlling and planning of power system. Accurate load forecasting, especially short-term load forecasting, ...

Yueli Hu; Huijie Ji; Xiaolong Song

2009-08-01T23:59:59.000Z

178

Load sensing system  

DOE Patents (OSTI)

A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast

Sohns, Carl W. (Oak Ridge, TN); Nodine, Robert N. (Knoxville, TN); Wallace, Steven Allen (Knoxville, TN)

1999-01-01T23:59:59.000Z

179

Discharge circuits and loads  

SciTech Connect

This will be an overview in which some of the general properties of loads are examined: their interface with the energy storage and switching devices; general problems encountered with different types of loads; how load behavior and fault modes can impact on the design of a power conditioning system (PCS).

Sarjeant, W.J.

1980-10-15T23:59:59.000Z

180

CRAD, Engineering - Los Alamos National Laboratory Waste Characterization,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Engineering - Los Alamos National Laboratory Waste Engineering - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Engineering - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Engineering Program portion of an Operational Readiness Review at the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Engineering - Los Alamos National Laboratory Waste Characterization,

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Workforce Statistics - Los Alamos Field Office | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Los Alamos Field Office | National Nuclear Security Los Alamos Field Office | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Workforce Statistics - Los Alamos Field Office Home > About Us > Our Operations > Management and Budget > Office of Civil Rights > Workforce Statistics > Workforce Statistics - Los Alamos Field Office

182

A comparison of measured wind park load histories with the WISPER and WISPERX load spectra  

DOE Green Energy (OSTI)

The blade-loading histories from two adjacent Micon 65/13 wind turbines are compared with the variable-amplitude test-loading histories known as the WISPER and WISPERX spectra. These standardized loading sequences were developed from blade flapwise load histories taken from nine different horizontal-axis wind turbines operating under a wide range of conditions in Europe. The subject turbines covered a broad spectrum of rotor diameters, materials, and operating environments. The final loading sequences were developed as a joint effort of thirteen different European organizations. The goal was to develop a meaningful loading standard for horizontal-axis wind turbine blades that represents common interaction effects seen in service. In 1990, NREL made extensive load measurements on two adjacent Micon 65/13 wind turbines in simultaneous operation in the very turbulent environment of a large wind park. Further, before and during the collection of the loads data, comprehensive measurements of the statistics of the turbulent environment were obtained at both the turbines under test and at two other locations within the park. The trend to larger but lighter wind turbine structures has made an understanding of the expected lifetime loading history of paramount importance. Experience in the US has shown that the turbulence-induced loads associated with multi-row wind parks in general are much more severe than for turbines operating individually or within widely spaced environments. Multi-row wind parks are much more common in the US than in Europe. In this paper we report on our results in applying the methodology utilized to develop the WISPER and WISPERX standardized loading sequences using the available data from the Micon turbines. While the intended purpose of the WISPER sequences were not to represent a specific operating environment, we believe the exercise is useful, especially when a turbine design is likely to be installed in a multi-row wind park.

Kelley, N.D.

1995-01-01T23:59:59.000Z

183

An Evaluation of the HVAC Load Potential for Providing Load Balancing Service  

Science Conference Proceedings (OSTI)

This paper investigates the potential of providing aggregated intra-hour load balancing services using heating, ventilating, and air-conditioning (HVAC) systems. A direct-load control algorithm is presented. A temperature-priority-list method is used to dispatch the HVAC loads optimally to maintain consumer-desired indoor temperatures and load diversity. Realistic intra-hour load balancing signals were used to evaluate the operational characteristics of the HVAC load under different outdoor temperature profiles and different indoor temperature settings. The number of HVAC units needed is also investigated. Modeling results suggest that the number of HVACs needed to provide a {+-}1-MW load balancing service 24 hours a day varies significantly with baseline settings, high and low temperature settings, and the outdoor temperatures. The results demonstrate that the intra-hour load balancing service provided by HVAC loads meet the performance requirements and can become a major source of revenue for load-serving entities where the smart grid infrastructure enables direct load control over the HAVC loads.

Lu, Ning

2012-09-30T23:59:59.000Z

184

Los angeles residential energy consumption. Final report  

SciTech Connect

Heating and cooling energy requirements were determined for characteristic single - family, townhouse, low - rise, and high - rise residences in Los Angeles, Calif. Using 1951 as a typical weather year for the area, heating and cooling energy requirements were determined for modified versions of these characteristic residences after both structural and comfort control modifications had been incorporated. Parameters of concern were structural (construction details, dimensions, and materials), energy consumption (heating and cooling equipment, types of fuel and energy used, and appliances and their energy consumption levels), and lifestyle (thermostat set points, relative humidity points, type and number of appliances, daily profile of appliance use, and use of ventilation fans). Annual heating and cooling loads and resultant energy requirements were calculated with the aid of a computer program. This program included subroutines for determining hourly load contributions throughout the year due to conduction, convection, air infiltration, radiation, and internal heat gain. The cooling load for the single - family residence was moderately larger than the heating load. Due to increased internal heat generation, the cooling load for the remaining residences was much larger than the heating load. Energy - conserving modifications resulted in the following: single - family residences required 55 percent, townhouse residences required 57 percent, low - rise residences required 55 percent, and high - rise residences required 82 percent of the primary energy consumed by the characteristic structure. Supporting data, illustrative layouts of the residences, and a list of references are included.

Reed, J.E.; Barber, J.E.; White, B.

1976-09-01T23:59:59.000Z

185

Power load forecasting Organization: Huizhou Electric Power, P. R. China  

E-Print Network (OSTI)

, regression, artificial intelligence. 1. Introduction Accurate models for electric power load forecasting are essential to the operation and planning of a utility company. Load forecasting helps an electric utility as electric load forecasting. In particular, ARMA (autoregressive moving average), ARIMA (autore- gressive

186

Commercial Nonintrusive Load Monitoring System Beta Test Results  

Science Conference Proceedings (OSTI)

Monitoring many different individual loads on customer premises is a costly, complex, and trouble-prone operation. The availability of a single instrument that could plug into the meter socket and measure individual premise loads would greatly simplify and reduce the cost of customer load monitoring. This report provides the test results of such a prototype instrument.

1999-12-15T23:59:59.000Z

187

Applications: Operational wind turbines  

E-Print Network (OSTI)

Capability Applications: Operational wind turbines Benefits: Optimize wind turbine performance Summary: Researchers at the Los Alamos National Laboratory (LANL) Intelligent Wind Turbine Program are developing a multi-physics modeling approach for the analysis of wind turbines in the presence of realistic

188

Automatic Electric Load Identification in  

E-Print Network (OSTI)

Abstract — A microgrid is the power system of choice for the electrification of rural areas in developing countries. It should be able to adapt to changing load situations without the need for specialists to change the configuration of the microgrid controller. This paper proposes a self-configuring microgrid management system that is able to adjust both generation and demand of the system, so that also in case of growing electricity demand the grid can still be operable by disconnecting unessential loads. A crucial task for the microgrid controller is to automatically identify the connected loads on the basis of their consumption behaviors. For this, a template-matching algorithm is proposed that is based on Dynamic Time Warping, which is primarily used in speech recognition. It has been found that for load profile analysis, simple signal features such as the number of rising edges or the aggregated energy consumption in a given time window is sufficient to describe the signal. In contrast to speech recognition, frequency domain analysis is not necessary.

Self-configuring Microgrids; Friederich Kupzog; Tehseen Zia; Adeel Abbas Zaidi

2009-01-01T23:59:59.000Z

189

Clean Tech Los Angeles | Open Energy Information  

Open Energy Info (EERE)

Los Angeles Los Angeles Jump to: navigation, search Name Clean Tech Los Angeles Place Los Angeles, California Zip 90017 Region Southern CA Area Notes Collaboration between CRA/LA, Caltech, DWP, JPL, Mayor's Office, Port UCLA, and USC to establish Los Angeles as the global leader in research, commercialization, and deployment of clean technologies Website http://cleantechlosangeles.org Coordinates 34.0543797°, -118.2672801° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.0543797,"lon":-118.2672801,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

190

Los Alamos National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

remembers former director Harold remembers former director Harold Agnew September 30, 2013 Manhattan Project pioneer was LANL director from 1970-1979 LOS ALAMOS, N.M., Sept. 30, 2013-Los Alamos National Laboratory Director Charlie McMillan today remembered Harold Agnew as a national treasure who transformed the Laboratory into what it is in the 21st century. "His contributions to the Laboratory made us the institution we are today," McMillan said. "It was his vision - decades ago - that recognized that national security science - 2 - brings value to a broad spectrum of breakthroughs. Los Alamos and the nation will be forever in Harold's debt." Agnew died at home on Sunday, Sept. 29, his family announced. He was the third director of Los Alamos National Laboratory, succeeding Robert

191

Around Los Alamos  

NLE Websites -- All DOE Office Websites (Extended Search)

first atomic bomb components were assembled. Don't want to walk? Book a van tour of the Atomic City. Explore the natural history of Los Alamos (rocks, fossils, plants, birds,...

192

Load Data Analysis and PowerShape Training: Strategic Load Research and Advanced Topics in Load Profiling for Settlements  

Science Conference Proceedings (OSTI)

Load shapes, representing usage patterns in the electric and gas industry, are a key factor in energy company operations and management. In the emerging restructured energy market, retail energy suppliers market energy to final customers and must arrange for electricity generation or gas delivery to meet their customers' needs. EPRI and Primen sponsored a workshop in September 2000 that addressed a range of issues associated with load shapes, including modeling, profiling for retail market settlement, re...

2000-12-20T23:59:59.000Z

193

Enforcement Letter, Los Alamos National Security - February 16, 2007 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- February 16, - February 16, 2007 Enforcement Letter, Los Alamos National Security - February 16, 2007 February 16, 2007 Letter to Los Alamos National Security, LLC regarding the Preliminary Notice of Violation issued to the University of California related to Operational Performance at the Los Alamos National Laboratory Today the enclosed Preliminary Notice of Violation (PNOV) was issued to the University of California related to operational performance deficiencies at the Los Alamos National Laboratory (LANL). Although civil penalties associated with the prior contract were waived by statute, the proposed penalty would have equaled $1.1 million dollars. Enforcement Letter, Los Alamos National Security-February 16, 2007 More Documents & Publications Preliminary Notice of Violation, Los Alamos National Laboratory -

194

Los Alamos National Laboratory | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Los Alamos National Laboratory Los Alamos National Laboratory Home > About Us > Our Operations > Acquisition and Project Management > M & O Support Department > Los Alamos National Laboratory Los Alamos National Laboratory Los Alamos National Laboratory DE-AC52-06NA25396 Operated by Los Alamos National Security, LLC Conformed to Modification Mod 242 dated 09/29/2013 BASIC Contract (Official) Modifications (Official) Funding Mods Available Upon Request Conformed Contract (Unofficial) LANL Basic Contract dated 12/21/05 (pdf, 5,501KB) LANL A004 (8/11/06) (pdf, 501KB) LANL Conformed Contract (Conformed to Mod 242, 09/29/2013) LANL A008 (9/29/06) (pdf, 485KB) LANL A009 (9/29/06) (pdf, 410KB) LANL A010 (9/30/06) (doc, 483KB) LANL A011(10/31/06) (pdf,6290KB) LANL A015 (1/25/07) (pdf, 954KB)

195

Residential equipment part load curves for use in DOE-2  

SciTech Connect

DOE-2 (DOE2 90) includes several correlation curves that predict the energy use of systems underpart load conditions. DOE-2 simulates systems on an hour-by-hour basis, so the correlations are intended to predict part load energy use (and efficiency) as a function of the part load ratio (PLR) for each hour, where PLR = Hourly Load/Available Capacity. Generally residential and small commercial HVAC equipment meets the load at off-design conditions by cycling on and off. Therefore, the part load correlations must predict the degradation due to this on and off operation over an hourly interval.

Henderson, Hugh; Huang, Y.J.; Parker, D.

1999-02-01T23:59:59.000Z

196

Load sensing system  

DOE Patents (OSTI)

A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast inventories of stored nuclear material can be continuously monitored and inventoried of minimal cost. 4 figs.

Sohns, C.W.; Nodine, R.N.; Wallace, S.A.

1999-05-04T23:59:59.000Z

197

Spinning Reserve from Hotel Air Conditioning Load - SHORT VERSION  

SciTech Connect

Even though preliminary tests were not conducted during times of highest system or hotel loading during the summer, they showed that hotel load can be curtailed by 22 to 37 percent depending on the outdoor temperature and time of day. Full response occurred in 12 to 60 seconds from when the system operator's command to shed load was issued and the load drop was very rapid.

Kueck, John D [ORNL; Kirby, Brendan J [ORNL

2008-01-01T23:59:59.000Z

198

Load Following in Geothermal Plants: Capabilities and Challenges  

Science Conference Proceedings (OSTI)

Typically, geothermal power plants are baseload facilities, but they may be operated in a load-following mode in the same manner as conventional steam plants. As grid penetration of renewable resources increases - especially those generation types with diurnal variations such as wind and solar - the ability of other power plants to load-follow becomes increasingly valuable.Load following is challenging in terms of the design, operations, and maintenance of flash and binary geothermal ...

2013-08-22T23:59:59.000Z

199

Space cooling demands from office plug loads  

Science Conference Proceedings (OSTI)

Undersizing space cooling systems for office buildings can result in uncomfortable and angry tenants on peak cooling days. However, oversizing wastes money because more capacity is installed than is needed, and oversized systems have a lower energy efficiency which makes operating costs higher than necessary. Oversizing can adversely affect comfort as well, because oversized systems may provide poor humidity control and large temperature variations. Correct system sizing requires estimating building heat loads accurately. This paper discusses the heat load generated by the plug load, which includes any electrical equipment that is plugged into outlets.

Komor, P.

1997-12-01T23:59:59.000Z

200

Definition: Direct Load Control Device | Open Energy Information  

Open Energy Info (EERE)

Load Control Device Load Control Device Jump to: navigation, search Dictionary.png Direct Load Control Device A remotely controllable switch that can turn power to a load or appliance on or off. Such a device could also be used to regulate the amount of power that a load can consume. Direct load control devices can be operated by a utility or third party energy provider to reduce a customer's energy demand at certain times.[1] Related Terms power, load References ↑ https://www.smartgrid.gov/category/technology/direct_load_control_device [[Ca LikeLike UnlikeLike You like this.Sign Up to see what your friends like. tegory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Direct_Load_Control_Device&oldid=502631

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Structural load combinations  

SciTech Connect

This paper presents the latest results of the program entitled, ''Probability Based Load Combinations For Design of Category I Structures''. In FY 85, a probability-based reliability analysis method has been developed to evaluate safety of shear wall structures. The shear walls are analyzed using stick models with beam elements and may be subjected to dead load, live load and in-plane eqrthquake. Both shear and flexure limit states are defined analytically. The limit state probabilities can be evaluated on the basis of these limit states. Utilizing the reliability analysis method mentioned above, load combinations for the design of shear wall structures have been established. The proposed design criteria are in the load and resistance factor design (LRFD) format. In this study, the resistance factors for shear and flexure and load factors for dead and live loads are preassigned, while the load factor for SSE is determined for a specified target limit state probability of 1.0 x 10/sup -6/ or 1.0 x 10/sup -5/ during a lifetime of 40 years. 23 refs., 9 tabs.

Hwang, H.; Reich, M.; Ellingwood, B.; Shinozuka, M.

1985-01-01T23:59:59.000Z

202

Watershed Mercury Loading Framework  

Science Conference Proceedings (OSTI)

This report explains and illustrates a simplified stochastic framework, the Watershed Mercury Loading Framework, for organizing and framing site-specific knowledge and information on mercury loading to waterbodies. The framework permits explicit treatment of data uncertainties. This report will be useful to EPRI members, state and federal regulatory agencies, and watershed stakeholders concerned with mercury-related human and ecological health risk.

2003-05-23T23:59:59.000Z

203

load | OpenEI  

Open Energy Info (EERE)

load load Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (9 months ago) Date Updated July 02nd, 2013 (7 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

204

Load-management decision  

Science Conference Proceedings (OSTI)

Utilities require baseload, intermediate, and peaking plants to meet fluctuating customer demand. These can be supplemented with off-peak generation and storage and load management, which can take the form of direct utility control over interruptible and deferrable customers or customer incentives that require off-peak demand. Utilities should make a careful analysis of their load profile, their generation mix, their ability to shift loads, and customer attitudes before deciding on a load-management program that fits their individual needs. They should also be aware that load management is only a limited resource with a number of uncertainties. Research programs into customer relations, system reliability, communications devices, and special control switches and meters will help to relieve some of the uncertainties. (DCK)

Lihach, N.; Gupta, P.

1982-05-01T23:59:59.000Z

205

Los Alamos Postdoc Association  

NLE Websites -- All DOE Office Websites (Extended Search)

Association Association Los Alamos Postdoc Association Fostering a sense of community, advocating for the postdoctoral community, and providing career development information. Contact Postdoc Program Office Email Postdocs are not only the future of science, but specifically, the future of LANL. Making the life of LANL postdocs more fulfilling socially, professionally LAPA logo The Los Alamos Postdoc Association (LAPA) at Los Alamos National Laboratory fosters a sense of community among the postdoctoral research staff; advocates for the postdoctoral community; and provides career development information to LANL postdocs. To ensure that the future of each postdoc is a bright one, LAPA works to make the life of the LANL postdoc more fulfilling both socially and, more importantly, professionally.

206

Los Alamos National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

announces Express Licensing program announces Express Licensing program August 1, 2013 Streamlined procedure speeds business access to new technology LOS ALAMOS, N.M., August 1, 2013-With the launch of a new "Express Licensing" program, access to innovative technology invented at Los Alamos National Laboratory (LANL) has gotten easier. The new licensing alternative was announced today by David Pesiri, director of LANL's Technology Transfer Division. "The Express License program offers an additional licensing resource for local entrepreneurs as well as national collaborators," Pesiri said. "Our licensing and software teams have worked very hard to offer this specialized model for those wanting to quickly license Los Alamos technology." - 2 - The Express Licensing program at LANL is the first of several new initiatives under

207

Characterization Wells at Los Alamos National Laboratory, IG-0703  

Energy.gov (U.S. Department of Energy (DOE))

The Los Alamos National Laboratory (LANL), located on the Pajarito Plateau in Northern New Mexico, has been in operation since the early 1940’s. LANL is a U.S. Department of Energy (DOE) research...

208

EA-1250: Proposed Strategic Computing Complex, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts for the proposal to construct and operate the Strategic Computing Complex within the U.S. Department of Energy Los Alamos National Laboratory Technical...

209

Load controller and method to enhance effective capacity of a photovotaic power supply using a dynamically determined expected peak loading  

DOE Patents (OSTI)

A load controller and method are provided for maximizing effective capacity of a non-controllable, renewable power supply coupled to a variable electrical load also coupled to a conventional power grid. Effective capacity is enhanced by monitoring power output of the renewable supply and loading, and comparing the loading against the power output and a load adjustment threshold determined from an expected peak loading. A value for a load adjustment parameter is calculated by subtracting the renewable supply output and the load adjustment parameter from the current load. This value is then employed to control the variable load in an amount proportional to the value of the load control parameter when the parameter is within a predefined range. By so controlling the load, the effective capacity of the non-controllable, renewable power supply is increased without any attempt at operational feedback control of the renewable supply. The expected peak loading of the variable load can be dynamically determined within a defined time interval with reference to variations in the variable load.

Perez, Richard (Delmar, NY)

2003-04-01T23:59:59.000Z

210

Overview of Fusion Research at Los Alamos G. A. Wurden  

E-Print Network (OSTI)

-4, 2008 U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA LA Security, LLC for the DOE/NNSA Slide 2 #12;Magnetized Target Fusion, liner compression of FRC, physics test A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA IAEA Paper IC/P4

211

Independent Activity Report, Los Alamos National Laboratory - August 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Independent Activity Report, Los Alamos National Laboratory - August 2012 August 2012 Defense Nuclear Facilities Safety Board Visit and Site Lead Planning Activities at the Los Alamos National Laboratory [HIAR LANL-2012-08-16] The purpose of this Office of Health, Safety and Security (HSS) activity was to maintain site operational awareness of key nuclear safety performance areas of interest to the Defense Nuclear Facilities Safety Board (DNFSB), monitor ongoing site oversight and planning activities for Los Alamos National Laboratory (LANL) nuclear facilities, and identify and initiate coordination of future HSS oversight activities at the site. Independent Activity Report, Los Alamos National Laboratory - August 2012 More Documents & Publications

212

JGI - Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations The Operations Department sees to it that JGI has the best possible facilities and support, ensuring that its operations are conducted in accordance with the...

213

Power Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Operations Outage Coordination Standards of Conduct Transmission Planning You are here: SN Home page > Power Operations Power Operations Western's Sierra Nevada Region...

214

Los Vientos II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Los Vientos II Facility Los Vientos II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Duke Energy Developer Duke Enegy Energy Purchaser Austin Energy Location Lyford TX Coordinates 26.33903762°, -97.66176224° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.33903762,"lon":-97.66176224,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

215

Los Vientos I | Open Energy Information  

Open Energy Info (EERE)

I I Jump to: navigation, search Name Los Vientos I Facility Los Vientos I Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Duke Energy Developer Duke Enegy Energy Purchaser CPS Energy Location Lyford TX Coordinates 26.326545°, -97.587158° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.326545,"lon":-97.587158,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

216

Los Alamos Lab: MPA: Organization  

NLE Websites -- All DOE Office Websites (Extended Search)

MPA Groups MPA Groups MPA-CINT | MPA-CMMS | MPA-STC | MPA-11 | MPA-MC Center for Integrated Nanotechnologies: MPA-CINT is a Department of Energy/Office of Science Nanoscale Science Research Center (NSRC) operating as a national user facility devoted to the establishment and leadership of a scientific community dedicated to nanoscience integration challenges. CINT is one of five NSRCs throughout the U.S. that form an integrated national program, affiliated with major facilities at the DOE's National Laboratories, to cover the diverse aspects of nanoscience and technology. In addition to CINT's Gateway to Los Alamos Facility, the center provides open access to tools and expertise needed to explore the continuum from scientific discovery to the integration of nanostructures into the micro and macro world through its core facility in Albuquerque.

217

EA-1332: Leasing Land for the Siting, Construction and Operation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Leasing Land for the Siting, Construction and Operation of a Commercial AM Radio Antenna at Los Alamos National Laboratory, Los Alamos, New Mexico EA-1332: Leasing Land for the...

218

CRAD, DOE Oversight - Los Alamos National Laboratory Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Oversight - Los Alamos National Laboratory Waste DOE Oversight - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, DOE Oversight - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Conduct of Operations Program portion of an Operational Readiness Review at the Los Alamos National Laboratory, Waste Characterization, Reduction, and Repackaging Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, DOE Oversight - Los Alamos National Laboratory Waste

219

HLW Glass Waste Loadings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HLW HLW Glass Waste Loadings Ian L. Pegg Vitreous State Laboratory The Catholic University of America Washington, DC Overview Overview  Vitrification - general background  Joule heated ceramic melter (JHCM) technology  Factors affecting waste loadings  Waste loading requirements and projections  WTP DWPF  DWPF  Yucca Mountain License Application requirements on waste loading  Summary Vitrification  Immobilization of waste by conversion into a glass  Internationally accepted treatment for HLW  Why glass?  Amorphous material - able to incorporate a wide spectrum of elements over wide ranges of composition; resistant to radiation damage  Long-term durability - natural analogs Relatively simple process - amenable to nuclearization at large  Relatively simple process - amenable to nuclearization at large scale  There

220

OpenEI - load  

Open Energy Info (EERE)

are given by a location defined by the Typical Meteorological Year (TMY) for which the weather data was collected. Commercial load data is sorted by the (TMY) site as a...

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Los Alamos National Laboratory passive solar program  

DOE Green Energy (OSTI)

Progress in passive solar tasks performed at the Los Alamos National Laboratory for FY-81 is documented. A third volume of the Passive Solar Design Handbook is nearly complete. Twenty-eight configurations of sunspaces were studied using the solar load ratio method of predicting performance; the configuration showing best performance is discussed. The minimum level of insolation needed to generate convective flow in the thermosiphon test rig is noted and measured. Information is also included on test room performance, off-peak auxiliary electric heating for a passive home, free convection experiment, monitored buildings, and technical support to the US Department of Energy.

Neeper, D.A.

1981-01-01T23:59:59.000Z

222

building load data | OpenEI Community  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL...

223

electric load data | OpenEI Community  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL...

224

commercial load | OpenEI Community  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL...

225

residential load | OpenEI Community  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL...

226

CRAD, Emergency Management - Los Alamos National Laboratory TA 55 SST  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management - Los Alamos National Laboratory TA 55 Emergency Management - Los Alamos National Laboratory TA 55 SST Facility CRAD, Emergency Management - Los Alamos National Laboratory TA 55 SST Facility June 2005 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Emergency Management program at the Los Alamos National Laboratory TA 55 SST Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Emergency Management - Los Alamos National Laboratory TA 55 SST Facility More Documents & Publications CRAD, Conduct of Operations - Los Alamos National Laboratory TA 55 SST

227

Independent Activity Report, Los Alamos National Laboratory - August 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Laboratory - Los Alamos National Laboratory - August 2012 Independent Activity Report, Los Alamos National Laboratory - August 2012 August 2012 Defense Nuclear Facilities Safety Board Visit and Site Lead Planning Activities at the Los Alamos National Laboratory [HIAR LANL-2012-08-16] The purpose of this Office of Health, Safety and Security (HSS) activity was to maintain site operational awareness of key nuclear safety performance areas of interest to the Defense Nuclear Facilities Safety Board (DNFSB), monitor ongoing site oversight and planning activities for Los Alamos National Laboratory (LANL) nuclear facilities, and identify and initiate coordination of future HSS oversight activities at the site. Independent Activity Report, Los Alamos National Laboratory - August 2012

228

Composite Load Model Evaluation  

Science Conference Proceedings (OSTI)

The WECC load modeling task force has dedicated its effort in the past few years to develop a composite load model that can represent behaviors of different end-user components. The modeling structure of the composite load model is recommended by the WECC load modeling task force. GE Energy has implemented this composite load model with a new function CMPLDW in its power system simulation software package, PSLF. For the last several years, Bonneville Power Administration (BPA) has taken the lead and collaborated with GE Energy to develop the new composite load model. Pacific Northwest National Laboratory (PNNL) and BPA joint force and conducted the evaluation of the CMPLDW and test its parameter settings to make sure that: • the model initializes properly, • all the parameter settings are functioning, and • the simulation results are as expected. The PNNL effort focused on testing the CMPLDW in a 4-bus system. An exhaustive testing on each parameter setting has been performed to guarantee each setting works. This report is a summary of the PNNL testing results and conclusions.

Lu, Ning; Qiao, Hong (Amy)

2007-09-30T23:59:59.000Z

229

Peak load control energy saving and cycling system  

SciTech Connect

A control system for limiting peak load demand and/or saving electrical energy by cycling the individual loads within an electrical distribution system is described. Electrical power usage in a distribution system is continuously monitored and compared to a pre-set limit. Loads can be added and cycled according to a limit set by the operator. Loads can also be dropped in response to a signal proportional to the electrical power usage in a distribution system within limits defined by the operator.

Burch, J.

1976-10-19T23:59:59.000Z

230

Analysis of industrial load management  

SciTech Connect

Industrial Load Management, ILM, has increased the possibilities of changing load profiles and raising load factors. This paper reports on load profile measurements and feasible load management applications that could be implemented in industry e.g. bivalent systems for heating of premises and processes, load priority systems, energy storage and rescheduling processes or parts of processes due to differential electricity rates. Industrial load variations on hourly, daily and seasonal basis are treated as well as the impact by load management on load curves e g peak clipping, valley filling and increased off-peak electricity usage.

Bjork, C.O.; Karlsson, B.G.

1986-04-01T23:59:59.000Z

231

Inspection of Internal Controls Over PersonalComputers at Los Alamos National Laboratory, IG-0597  

Energy.gov (U.S. Department of Energy (DOE))

Computers are used extensively in the full range of operations at the Los Alamos National Laboratory (LANL), including processing classified national security information. LANL reported an...

232

Direct methanol fuel cells at reduced catalyst loadings  

DOE Green Energy (OSTI)

We focus in this paper on the reduction of catalyst loading in direct methanol fuel cells currently under development at Los Alamos National Laboratory. Based on single-cell DMFC testing, we discuss performance vs. catalyst loading trade-offs and demonstrate optimization of the anode performance. We also show test data for a short five-cell DMFC stack with the average total platinum loading of 0.53 mg cm{sup -2} and compare performance of this stack with the performance of a single direct methanol fuel cell using similar total amount of precious metal.

Zelenay, P. (Piotr); Guyon, F. (Francois); Gottesfeld, Shimshon

2001-01-01T23:59:59.000Z

233

DIRECT METHANOL FUEL CELLS AT REDUCED CATALYST LOADINGS  

DOE Green Energy (OSTI)

We focus in this paper on the reduction of catalyst loading in direct methanol fuel cells currently under development at Los Alamos National Laboratory. Based on single-cell DMFC testing, we discuss performance vs. catalyst loading trade-offs and demonstrate optimization of the anode performance. We also show test data for a short five-cell DMFC stack with the average total platinum loading of 0.53 mg cm{sup {minus}2} and compare performance of this stack with the performance of a single direct methanol fuel cell using similar total amount of precious metal.

P. ZELENAY; F. GUYON; SM. GOTTESFELD

2001-05-01T23:59:59.000Z

234

Distribution substation load impacts of residential air conditioner load control  

SciTech Connect

An ongoing experiment to monitor the substation level load impacts of end-use load control is described. An overview of the data acquisition system, experimental procedures and analysis techniques are provided. Results of the 1983 and 1984 experiments demonstrate the value of aggregate load impact monitoring as a means of verifying load research results, calculating the diversity of end-use loads, and predicting the impacts of load management on the transmission and distribution systems.

Heffner, G.C.; Kaufman, D.A.

1985-07-01T23:59:59.000Z

235

First results of the Los Alamos polyphase boost converter-modulator  

DOE Green Energy (OSTI)

This paper describes the first full-scale electrical test results of the Los Alamos polyphase boost converter-modulator being developed for the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory. The convertrr-modulator provides 140 kV, 1.2 mS, 60 Hz pulses to a 5 MW, 805 MHz klystron. The system, which has 1 MW average power, derives its +/- 1250 Volt DC buss link voltages from a standard 3-phase utility 13.8 kV to 2100 volt transformer. An SCR pre-regulator provides a soft-start function in addition to correction of line and load variations, from no-load to full-load. Energy storage is provided by low inductance self-clearing metallized hazy polypropylene traction capacitors. Each of the 3-phase H-bridge Insulated Gate Bipolar Transistor (IGBT) Pulse-Width Modulation (PWM) drivers are resonated with the amorphous nanocrystalline boost transformer and associated peaking circuits to provide zero-voltage-switching characteristics for the IGBT's. This design feature minimizes IGBT switching losses. By PWM of individual IGBT conduction angles, output pulse regulation with adaptive feedforward and feedback techniques is used to improve the klystron voltage pulse shape. In addition to the first operational results, this paper will discuss the relevant design techniques associated with the boost converter-modulator topology.

Doss, James D.; Gribble, R. F. (Robert F.); Lynch, M. T. (Michael T.); Rees, D. E. (Daniel E.); Tallerico, P. J. (Paul J.); Reass, W. A. (William A.)

2001-01-01T23:59:59.000Z

236

Load management strategies for electric utilities: a production cost simulation  

SciTech Connect

This paper deals with the development and application of a simulation model for analyzing strategies for managing the residential loads of electric utilities. The basic components of the model are (1) a production-cost model, which simulates daily operation of an electric power system; (2) a load model, which disaggregates system loads into appliance loads and other loads; and (3) a comparison model, which compares the production costs and energy consumption needed to meet a particular load profile to the corresponding costs and energy consumption required for another load profile. The profiles in each pair define alternative ways of meeting the same demand. A method for disaggregating load profiles into appliance components is discussed and several alternative strategies for residential load management for a typical northeastern electric utility are formulated. The method is based on an analysis of the composition of electric loads for a number of classes of residential customers in the model utility system. The effect of alternative load management strategies on the entire residential loadcurve is determined by predicting the effects of these strategies on the specific appliance components of the loadcurve. The results of using the model to analyze alternative strategies for residential load management suggest that load management strategies in the residential sector, if adopted by utilities whose operating and load characteristics are similar to those of the system modeled here, must take into account a wide variety of appliances to achieve significant changes in the total load profile. Moreover, the results also suggest that it is not easy to reduce costs significantly through new strategies for managing residential loads only and that, to be worthwhile, cost-reducing strategies will have to encompass many kinds of appliances.

Blair, P.D.

1979-03-01T23:59:59.000Z

237

Effect of Operational Transients on Boiler Damage  

Science Conference Proceedings (OSTI)

It is increasingly the case that utility systems demand more flexibility in a unit's ability to respond to dispatch requirements, which can create a conflict between maximizing efficient operation and limiting damage accumulation. A boiler can be operated in various cycling modes and can be subjected to planned and unplanned transients associated with load following, minimum load operation, forced cooling, variable pressure operation, increased ramp rates, increased attemperation, over-temperature operat...

2009-03-24T23:59:59.000Z

238

Load Monitoring CEC/LMTF Load Research Program  

SciTech Connect

This white paper addresses the needs, options, current practices of load monitoring. Recommendations on load monitoring applications and future directions are also presented.

Huang, Zhenyu; Lesieutre, B.; Yang, Steve; Ellis, A.; Meklin, A.; Wong, B.; Gaikwad, A.; Brooks, D.; Hammerstrom, Donald J.; Phillips, John; Kosterev, Dmitry; Hoffman, M.; Ciniglio, O.; Hartwell, R.; Pourbeik, P.; Maitra, A.; Lu, Ning

2007-11-30T23:59:59.000Z

239

Los Alamos National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

May 14, 2013 May 14, 2013 Value of up to $150 million over five years LOS ALAMOS, N.M., May 14, 2013-Los Alamos National Laboratory has awarded a master task order agreement in which three small businesses will compete for environmental work worth up to $150 million over five years. The businesses each have offices in northern New Mexico. The agreement is for technical services for the Laboratory's Environmental Programs directorate and includes work such as environmental engineering design, regulatory support, risk assessment and reporting. - 2 - The companies chosen are Terranear PMC, Navarro Research and Engineering, Inc., and Adelante Consulting, Inc. The agreement is for three years with two additional one- year options. Task orders under this agreement will be competitively bid among the

240

EPRI/GRI Load Shape Workshop: Load Data Analysis for Gas and Electric Markets  

Science Conference Proceedings (OSTI)

Load shapes, representing usage patterns in the electric and gas industry, are a key factor in energy company operations and management. In the emerging restructured energy market, retail energy suppliers market energy to final customers and must arrange for electricity generation or gas delivery to meet their customers' needs. EPRI and GRI sponsored a two-day workshop in June, 1999 that addressed a range of issues associated with load shapes, including modeling, profiling for retail market settlement, r...

1999-11-10T23:59:59.000Z

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Classification of total load demand profiles for war-ships based on pattern recognition methods  

Science Conference Proceedings (OSTI)

The classification of total load demand profiles for every type of war-ships is crucial information, because it is the necessary base for a series of studies and operations, such as load estimation, load shedding and power management systems. In this ... Keywords: adequacy measures, clustering algorithms, load profiles, pattern recognition, warship

G. J. Tsekouras; I. S. Karanasiou; F. D. Kanellos

2011-07-01T23:59:59.000Z

242

Nature Climate Change features Los  

NLE Websites -- All DOE Office Websites (Extended Search)

Nature Climate Change features Los Alamos forest research February 27, 2013 New print edition of journal tags tree-stress project for cover story LOS ALAMOS, N.M., Feb. 27,...

243

Independent review of estimated load reductions for PJM's small customer load response pilot project  

SciTech Connect

This study describes the results of a low-cost approach used to measure reported load reductions from a residential electric water heater (EWH) load control program operated as part of PJM Interconnection's Demand Response small customer pilot program. Lawrence Berkeley National Laboratory (LBNL) conducted this independent review of the engineering estimates for EWH load control reported by a Curtailment Service Provider (CSP) at PJM's request. LBNL employed low-cost measurement and verification (M&V) approaches that utilized existing interval metering equipment to monitor results for a series of load control tests. The CSP collected hourly load data for two substations and several hundred households over a six-week period in October and November 2003. During this time period, the CSP operated its electric water heater load control program during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems signifiogram during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems significantly limit our ability to differentiate between control-related and non-control related differences in substation-level load shape data. The usefulness and accuracy of the results were hampered by operational problems encountered during the measurement period as well as in sufficient number of load research grade interval meters at one cooperative. Given the larger sample size at one electric cooperative and more statistically-robust results, there is some basis to suggest that the Adjusted Diversified Demand Factor (ADDF) values used by the CSP somewhat over-state the actual load reductions. Given the results and limitations of the M&V approach as implemented, we suggest several options for PJM to consider: (1) require load aggregators participating in ISODR programs to utilize formal PURPA-compliant load research samples in their M&V plans, and (2) continue developing lower cost M&V approaches for mass market load control programs that incorporate suggested improvements described in this study.

Heffner, G.; Moezzi, M.; Goldman, C.

2004-06-01T23:59:59.000Z

244

DC switching regulated power supply for driving an inductive load  

DOE Patents (OSTI)

A power supply for driving an inductive load current from a dc power supply hrough a regulator circuit including a bridge arrangement of diodes and switching transistors controlled by a servo controller which regulates switching in response to the load current to maintain a selected load current. First and second opposite legs of the bridge are formed by first and second parallel-connected transistor arrays, respectively, while the third and fourth legs of the bridge are formed by appropriately connected first and second parallel connected diode arrays, respectively. The regulator may be operated in three "stages" or modes: (1) For current runup in the load, both first and second transistor switch arrays are turned "on" and current is supplied to the load through both transistor arrays. (2) When load current reaches the desired level, the first switch is turned "off", and load current "flywheels" through the second switch array and the fourth leg diode array connecting the second switch array in series with the load. Current is maintained by alternating between modes 1 and 2 at a suitable duty cycle and switching rate set by the controller. (3) Rapid current rundown is accomplished by turning both switch arrays "off", allowing load current to be dumped back into the source through the third and fourth diode arrays connecting the source in series opposition with the load to recover energy from the inductive load. The three operating states are controlled automatically by the controller.

Dyer, George R. (Norris, TN)

1986-01-01T23:59:59.000Z

245

PARALLEL OPERATION OF WELDING GENERATORS  

SciTech Connect

Eight 900-amp, 36-kw direct current welding generators driven by eight 60-hp induction motors were operated in parallel to supply up to 7200 amp to resistance loads for heat transfer studies. A description and circuit designs of this installation, which provides safety interlocks and permits sectionalized operation for separate leads, are given. (auth)

Butler, B.H.

1960-06-01T23:59:59.000Z

246

Conduct of Operations Criteria, Review, & Approach Documents | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conduct of Operations Criteria, Review, & Approach Documents Conduct of Operations Criteria, Review, & Approach Documents Conduct of Operations Criteria, Review, & Approach Documents Documents Available for Download CRAD, Conduct of Operations - Idaho MF-628 Drum Treatment Facility CRAD, Conduct of Operations - Idaho Accelerated Retrieval Project Phase II CRAD, Conduct of Operations - Los Alamos National Laboratory TA 55 SST Facility CRAD, Conduct of Operations - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Conduct of Operations - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Conduct of Operations - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Conduct of Operations - Oak Ridge National Laboratory TRU ALPHA LLWT Project

247

Mass-Loaded Flows  

E-Print Network (OSTI)

A key process within astronomy is the exchange of mass, momentum, and energy between diffuse plasmas in many types of astronomical sources (including planetary nebulae, wind-blown bubbles, supernova remnants, starburst superwinds, and the intracluster medium) and dense, embedded clouds or clumps. This transfer affects the large scale flows of the diffuse plasmas as well as the evolution of the clumps. I review our current understanding of mass-injection processes, and examine intermediate-scale structure and the global effect of mass-loading on a flow. I then discuss mass-loading in a variety of diffuse sources.

J. M. Pittard

2006-07-13T23:59:59.000Z

248

Distribution load study aids system planning  

SciTech Connect

The Walnut Metering Project is an experimental substation and distribution system metering installation designed to provide quantitative data for distribution system planning. The design and operation of the metering equipment are discussed. After 3 years of operation it was concluded that the primary economic benefits anticipated from the determination of substation area diversity characteristics did not materialize because the peaking characteristics of the substations in the area were typically coincident with each other. However, the data obtained had a significant positive impact, both economically and operationally, in the field of equipment loadability, and is beneficial to activities related to load projections and distribution system planning. (LCL)

Scofield J.M.

1976-07-01T23:59:59.000Z

249

The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Radioactive Liquid Waste Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory OAS-L-13-15 September 2013 Department of Energy Washington, DC 20585 September 26, 2013 MEMORANDUM FOR THE ASSOCIATE ADMINISTRATOR FOR ACQUISITION AND PROJECT MANAGEMENT MANAGER LOS ALAMOS FIELD OFFICE FROM: David Sedillo Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory" BACKGROUND The Department of Energy's Los Alamos National Laboratory (Los Alamos) is a Government- owned, contractor operated Laboratory that is part of the National Nuclear Security Administration's (NNSA) nuclear weapons complex. Los Alamos' primary responsibility is to

250

STLOAD 1.1 (Substation Terminal Equipment Loading Software)  

Science Conference Proceedings (OSTI)

EPRI’s Substation Terminal Equipment Loading software (STLOAD 1.1) calculates temperatures and thermal ratings for substation equipment based on physical parameters of the equipment, electrical load, air temperature, and, where appropriate, solar heating and wind. This provides a convenient way for substation engineers to maximize the usage of existing substation terminal equipment under a wide variety of operating conditions. STLOAD can perform temperature and rating calculations for a daily load and am...

2009-04-06T23:59:59.000Z

251

SYSPLAN. Load Leveling Battery System Costs  

SciTech Connect

SYSPLAN evaluates capital investment in customer side of the meter load leveling battery systems. Such systems reduce the customer`s monthly electrical demand charge by reducing the maximum power load supplied by the utility during the customer`s peak demand. System equipment consists of a large array of batteries, a current converter, and balance of plant equipment and facilities required to support the battery and converter system. The system is installed on the customer`s side of the meter and controlled and operated by the customer. Its economic feasibility depends largely on the customer`s load profile. Load shape requirements, utility rate structures, and battery equipment cost and performance data serve as bases for determining whether a load leveling battery system is economically feasible for a particular installation. Life-cycle costs for system hardware include all costs associated with the purchase, installation, and operation of battery, converter, and balance of plant facilities and equipment. The SYSPLAN spreadsheet software is specifically designed to evaluate these costs and the reduced demand charge benefits; it completes a 20 year period life cycle cost analysis based on the battery system description and cost data. A built-in sensitivity analysis routine is also included for key battery cost parameters. The life cycle cost analysis spreadsheet is augmented by a system sizing routine to help users identify load leveling system size requirements for their facilities. The optional XSIZE system sizing spreadsheet which is included can be used to identify a range of battery system sizes that might be economically attractive. XSIZE output consisting of system operating requirements can then be passed by the temporary file SIZE to the main SYSPLAN spreadsheet.

Hostick, C.J. [Pacific Northwest Lab., Richland, WA (United States)

1988-03-22T23:59:59.000Z

252

Operations & Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

253

Annual Operation of Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

In 2009, many coal-fired generating units equipped with selective catalytic reduction (SCR) systems for nitrogen oxide (NOX) control will convert from seasonal to annual SCR operation. This report provides guidelines on how to prepare for annual operation. It focuses on existing experience with annual operation, catalyst management strategy, equipment reliability, cold weather issues, low load and cycling operation, and risk assessment.

2007-12-18T23:59:59.000Z

254

Cooling load estimation methods  

DOE Green Energy (OSTI)

Ongoing research on quantifying the cooling loads in residential buildings, particularly buildings with passive solar heating systems, is described. Correlations are described that permit auxiliary cooling estimates from monthly average insolation and weather data. The objective of the research is to develop a simple analysis method, useful early in design, to estimate the annual cooling energy required of a given building.

McFarland, R.D.

1984-01-01T23:59:59.000Z

255

LOADING AND UNLOADING DEVICE  

DOE Patents (OSTI)

A device for loading and unloading fuel rods into and from a reactor tank through an access hole includes parallel links carrying a gripper. These links enable the gripper to go through the access hole and then to be moved laterally from the axis of the access hole to the various locations of the fuel rods in the reactor tank.

Treshow, M.

1960-08-16T23:59:59.000Z

256

Multidimensional spectral load balancing  

DOE Patents (OSTI)

A method of and apparatus for graph partitioning involving the use of a plurality of eigenvectors of the Laplacian matrix of the graph of the problem for which load balancing is desired. The invention is particularly useful for optimizing parallel computer processing of a problem and for minimizing total pathway lengths of integrated circuits in the design stage.

Hendrickson, Bruce A. (Albuquerque, NM); Leland, Robert W. (Albuquerque, NM)

1996-12-24T23:59:59.000Z

257

Buildings Stock Load Control  

E-Print Network (OSTI)

Researchers and practitioners have proposed a variety of solutions to reduce electricity consumption and curtail peak demand. This research focuses on electricity demand control by applying some strategies in existing building to reduce it during the extreme climate period. The first part of this paper presents the objectives of the study: ? to restrict the startup polluting manufacturing units (power station), ? to limit the environmental impacts (greenhouse emission), ? to reduce the transport and distribution electricity infrastructures The second part presents the approach used to rise the objectives : ? To aggregat the individual loads and to analyze the impact of different strategies from load shedding to reduce peak power demand by: ? Developing models of tertiary buildings stocks (Schools, offices, Shops, hotels); ? Making simulations for different load shedding strategies to calculate potential peak power saving. The third part is dedicated to the description of the developed models: An assembly of the various blocks of the library of simbad and simulink permit to model building. Finally the last part prensents the study results: Graphs and tables to see the load shedding strategies impacts.

Joutey, H. A.; Vaezi-Nejad, H.; Clemoncon, B.; Rosenstein, F.

2006-01-01T23:59:59.000Z

258

OpenEI Community - load data  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

259

OpenEI Community - electric load data  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

260

OpenEI Community - building load  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

OpenEI Community - residential load  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

262

OpenEI Community - commercial load  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

263

OpenEI Community - building load data  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

264

Management and Operating Contract for the Los Alamos National...  

National Nuclear Security Administration (NNSA)

Cuba Georgia Hong Kong India Iran Iraq Israel Kazakhstan Kygyrstan Libya Moldova North Korea (Democratic Pakistan People's Republic of) Russia Sudan Syria Taiwan Tajikistan...

265

Loading guide for oil-immersed power transformers  

E-Print Network (OSTI)

Provides recommendations for the specification and loading of power transformers complying with IEC 60076, from the point of view of operating temperatures and thermal ageing. Gives recommendations for loading above the name-plate rating and guidance for the planner to choose rated quantities for new installations.

International Electrotechnical Commission. Geneva

1991-01-01T23:59:59.000Z

266

Enhancements to ANNSTLF, EPRI's Short Term Load Forecaster  

Science Conference Proceedings (OSTI)

Reliable hourly load forecasts are important to electric utilities, power marketers, energy service providers, and independent system operators. To meet this need, EPRI's Artificial Neural Net Short Term Load Forecaster (ANNSTLF), which is already implemented at more than thirty-five utilities, was recently enhanced for greater accuracy and user friendliness.

1997-12-08T23:59:59.000Z

267

Upper Los Alamos Canyon Cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

Upper Los Alamos Canyon Cleanup Upper Los Alamos Canyon Cleanup Upper Los Alamos Canyon Cleanup The Upper Los Alamos Canyon Project involves cleaning up hazardous materials left over from some of the Laboratory's earliest activities. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Located along Los Alamos Canyon from 7th Street to the Pajarito Ski Hill, the Upper Los Alamos Canyon Project involves examining sites in present and former Laboratory technical areas to see if any further environmental cleanup actions are needed. If not, the Laboratory can apply to have these sites removed permanently from LANL's Hazardous Waste Permit, meaning that no further actions are needed at those sites. Among the 115 sites included in the Upper LA Canyon Project, 54 have been

268

EA-0969: Low Energy Accelerator Laboratory Technical Area 53 Los Alamos  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Low Energy Accelerator Laboratory Technical Area 53 Los 9: Low Energy Accelerator Laboratory Technical Area 53 Los Alamos National Laboratory, Los Alamos, New Mexico EA-0969: Low Energy Accelerator Laboratory Technical Area 53 Los Alamos National Laboratory, Los Alamos, New Mexico SUMMARY This EA evaluates the environmental impacts of the U.S. Department of Energy's Los Alamos National Laboratory in Los Alamos, New Mexico to construct and operate a small research and development laboratory building at Technical Area 53. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 17, 1995 EA-0969: Finding of No Significant Impact Low Energy Accelerator Laboratory Technical Area 53 Los Alamos National Laboratory April 17, 1995 EA-0969: Final Environmental Assessment Low Energy Accelerator Laboratory Technical Area 53 Los Alamos National

269

Understanding Thermal Drift in Liquid Nitrogen Loads Used for Radiometric Calibration in the Field  

Science Conference Proceedings (OSTI)

An absorbing load in a liquid nitrogen bath is commonly used as a radiance standard for calibrating radiometers operating at microwave to infrared wavelengths. It is generally assumed that the physical temperature of the load is stable and equal ...

Scott N. Paine; David D. Turner; Nils Küchler

270

Energy Storage for Use in Load Frequency Control  

E-Print Network (OSTI)

Certain energy storage technologies are well-suited to the high-frequency, high-cycling operation which is required in provision of load frequency control (LFC). To limit the total stored energy capacity required while ...

Leitermann, Olivia

271

CRAD, Radiological Controls - Los Alamos National Laboratory Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Radiological Controls - Los Alamos National Laboratory Waste Radiological Controls - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Radiological Controls - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Radiation Protection Program portion of an Operational Readiness Review at the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Radiological Controls - Los Alamos National Laboratory Waste

272

CRAD, Fire Protection - Los Alamos National Laboratory Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fire Protection - Los Alamos National Laboratory Waste Fire Protection - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Fire Protection - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Fire Protection Program portion of an Operational Readiness Review at the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Fire Protection - Los Alamos National Laboratory Waste

273

CRAD, Emergency Management - Los Alamos National Laboratory Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management - Los Alamos National Laboratory Waste Emergency Management - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Emergency Management - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Emergency Management Program portion of an Operational Readiness Review at the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Emergency Management - Los Alamos National Laboratory Waste

274

Department of Energy Initiates Formal Enforcement Action in Los Alamos  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Initiates Formal Enforcement Action in Los Initiates Formal Enforcement Action in Los Alamos National Laboratory Classified Information Breach Department of Energy Initiates Formal Enforcement Action in Los Alamos National Laboratory Classified Information Breach July 13, 2007 - 2:54pm Addthis WASHINGTON, DC - Following extensive investigations, the Department of Energy (DOE) and its National Nuclear Security Administration (NNSA) took formal enforcement actions today against the University of California (UC) and the Los Alamos National Security, LLC (LANS), the prior and current management and operating contractors of the Los Alamos National Laboratory in New Mexico, for violations of classified information security requirements under their respective contracts. Investigations revealed that management deficiencies of both contractors were a central

275

Independent Oversight Review, Los Alamos National Laboratory - November  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Laboratory - National Laboratory - November 2013 Independent Oversight Review, Los Alamos National Laboratory - November 2013 November 2013 Review of the Los Alamos National Laboratory Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of radiological protection program activity-level implementation performed by Los Alamos National Security and its subcontractors at Los Alamos National Laboratory, Los Alamos Neutron Science Center, and Environmental and Waste Management Operations Area G facilities. The review was performed August 19-29, 2013, by the U.S. Department of Energy's (DOE) Office of Safety and Emergency Management Evaluations, which is within the DOE Office of Health, Safety and Security. This report discusses the scope, background,

276

CRAD, Management - Los Alamos National Laboratory Waste Characterization,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CRAD, Management - Los Alamos National Laboratory Waste CRAD, Management - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Management - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Management portion of an Operational Readiness Review at the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Management - Los Alamos National Laboratory Waste Characterization,

277

Independent Oversight Review, Los Alamos National Laboratory - September  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review, Los Alamos National Laboratory - Review, Los Alamos National Laboratory - September 2011 Independent Oversight Review, Los Alamos National Laboratory - September 2011 September 2011 Review of the Facility Centered Assessment of the Los Alamos National Laboratory Waste Disposition Project This report documents the results of the U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS) Independent Oversight review of the Facility Centered Assessment (FCA) of the Los Alamos National Laboratory (LANL) Waste Disposition Project (WDP), which includes the Radioassay and Nondestructive Testing (RANT) Facility; Waste Characterization, Reduction, and Repackaging Facility (WCRRF); and Area G transuranic (TRU) waste operations. This report was developed and approved in accordance with DOE O 227.1, Independent Oversight Program. The

278

CRAD, Safety Basis - Los Alamos National Laboratory Waste Characterization,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Basis - Los Alamos National Laboratory Waste Basis - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Safety Basis - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Safety Basis portion of an Operational Readiness Review at the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Safety Basis - Los Alamos National Laboratory Waste Characterization,

279

Investigation of Catalyst Deactivation from Operation Below the Minimum Operating Temperature  

Science Conference Proceedings (OSTI)

The expanding use of alternative and renewable energy sources is forcing large coal-fired power plants to operate at low load more frequently and for longer periods. For units with selective catalytic reduction (SCR) systems and without economizer bypass capabilities, low-load operation requires the SCR system to operate at reduced flue gas temperatures. For units burning high-sulfur coal, these lower temperatures are often below the minimum operating temperature defined by SCR catalyst vendors. ...

2012-09-11T23:59:59.000Z

280

Load Capacity of Bodies  

E-Print Network (OSTI)

For the stress analysis in a plastic body $\\Omega$, we prove that there exists a maximal positive number $C$, the \\emph{load capacity ratio,} such that the body will not collapse under any external traction field $t$ bounded by $Y_{0}C$, where $Y_0$ is the elastic limit. The load capacity ratio depends only on the geometry of the body and is given by $$ \\frac{1}{C}=\\sup_{w\\in LD(\\Omega)_D} \\frac{\\int_{\\partial\\Omega}|w|dA} {\\int_{\\Omega}|\\epsilon(w)|dV}=\\left\\|\\gamma_D\\right\\|. $$ Here, $LD(\\Omega)_D$ is the space of isochoric vector fields $w$ for which the corresponding stretchings $\\epsilon(w)$ are assumed to be integrable and $\\gamma_D$ is the trace mapping assigning the boundary value $\\gamma_D(w)$ to any $w\\in LD(\\Omega)_D$.

Reuven Segev

2005-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Primer on Flexible Operations in Fossil Plants  

Science Conference Proceedings (OSTI)

This primer describes the significant changes that have occurred over the past decade in the duty cycles of fossil power plants and the implications for plant equipment and costs. These changes include the increasing shift in coal-fired and natural-gas-fired power plants from high-capacity-factor, baseloaded operation to various modes of flexible operation, including load-following and low-load operation. ...

2013-09-27T23:59:59.000Z

282

CRAD, Training - Los Alamos National Laboratory Waste Characterization,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Waste Characterization, Reduction, and Repackaging Facility CRAD, Training - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Training Program portion of an Operational Readiness Review at the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Training - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility

283

CRAD, Quality Assurance - Los Alamos National Laboratory Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Waste Characterization, Reduction, and Repackaging Facility CRAD, Quality Assurance - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Quality Assurance Program portion of an Operational Readiness Review at the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Quality Assurance - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility

284

Load responsive hydrodynamic bearing  

Science Conference Proceedings (OSTI)

A load responsive hydrodynamic bearing is provided in the form of a thrust bearing or journal bearing for supporting, guiding and lubricating a relatively rotatable member to minimize wear thereof responsive to relative rotation under severe load. In the space between spaced relatively rotatable members and in the presence of a liquid or grease lubricant, one or more continuous ring shaped integral generally circular bearing bodies each define at least one dynamic surface and a plurality of support regions. Each of the support regions defines a static surface which is oriented in generally opposed relation with the dynamic surface for contact with one of the relatively rotatable members. A plurality of flexing regions are defined by the generally circular body of the bearing and are integral with and located between adjacent support regions. Each of the flexing regions has a first beam-like element being connected by an integral flexible hinge with one of the support regions and a second beam-like element having an integral flexible hinge connection with an adjacent support region. A least one local weakening geometry of the flexing region is located intermediate the first and second beam-like elements. In response to application of load from one of the relatively rotatable elements to the bearing, the beam-like elements and the local weakening geometry become flexed, causing the dynamic surface to deform and establish a hydrodynamic geometry for wedging lubricant into the dynamic interface.

Kalsi, Manmohan S. (Houston, TX); Somogyi, Dezso (Sugar Land, TX); Dietle, Lannie L. (Stafford, TX)

2002-01-01T23:59:59.000Z

285

Los Alamos National Laboratory  

SciTech Connect

The purpose of the briefing is to describe general laboratory technical capabilities to be used for various groups such as military cadets or university faculty/students and post docs to recruit into a variety of Los Alamos programs. Discussed are: (1) development and application of high leverage science to enable effeictive, predictable and reliability outcomes; (2) deter, detect, characterize, reverse and prevent the proliferation of weapons of mass destruction and their use by adversaries and terrorists; (3) modeling and simulation to define complex processes, predict outcomes, and develop effective prevention, response, and remediation strategies; (4) energetic materials and hydrodynamic testing to develop materials for precise delivery of focused energy; (5) materials cience focused on fundamental understanding of materials behaviors, their quantum-molecular properties, and their dynamic responses, and (6) bio-science to rapidly detect and characterize pathogens, to develop vaccines and prophylactic remedies, and to develop attribution forensics.

Dogliani, Harold O [Los Alamos National Laboratory

2011-01-19T23:59:59.000Z

286

Nuclear Forensics at Los Alamos National Laboratory  

SciTech Connect

The overview of this presentation is: (1) Introduction to nonproliferation efforts; (2) Scope of activities at Los Alamos National Laboratory; (3) Facilities for radioanalytical work at LANL; (4) Radiochemical characterization capabilities; and (5) Bulk chemical and materials analysis capabilities. Some conclusions are: (1) Analytical chemistry measurements on plutonium and uranium matrices are critical to numerous defense and non-defense programs including safeguards accountancy verification measurements; (2) Los Alamos National Laboratory operates capable actinide analytical chemistry and material science laboratories suitable for nuclear material forensic characterization; (3) Actinide analytical chemistry uses numerous means to validate and independently verify that measurement data quality objectives are met; and (4) Numerous LANL nuclear facilities support the nuclear material handling, preparation, and analysis capabilities necessary to evaluate samples containing nearly any mass of an actinide (attogram to kilogram levels).

Podlesak, David W [Los Alamos National Laboratory; Steiner, Robert E. [Los Alamos National Laboratory; Burns, Carol J. [Los Alamos National Laboratory; LaMont, Stephen P. [Los Alamos National Laboratory; Tandon, Lav [Los Alamos National Laboratory

2012-08-09T23:59:59.000Z

287

Demand or Request: Will Load Behave?  

Science Conference Proceedings (OSTI)

Power planning engineers are trained to design an electric system that satisfies predicted electrical demand under stringent conditions of availability and power quality. Like responsible custodians, we plan for the provision of electrical sustenance and shelter to those in whose care regulators have given us the responsibility to serve. Though most customers accept this nurturing gladly, a growing number are concerned with the economic costs and environmental impacts of service at a time when technology (particularly distributed generation, storage, automation, and information networks) offers alternatives for localized control and competitive service. As customers’ and their systems mature, a new relationship with the electricity provider is emerging. Demand response is perhaps the first unsteady step where the customer participates as a partner in system operations. This paper explores issues system planners need to consider as demand response matures to significant levels beyond direct load control and toward a situation where service is requested and bargains are reached with the electricity provider based on desired load behavior. On one hand, predicting load growth and behavior appears more daunting than ever. On the other, for the first time load becomes a new resource whose behavior can be influenced during system operations to balance system conditions.

Widergren, Steven E.

2009-07-30T23:59:59.000Z

288

Appliance Commitment for Household Load Scheduling  

Science Conference Proceedings (OSTI)

This paper presents a novel appliance commitment algorithm that schedules thermostatically-controlled household loads based on price and consumption forecasts considering users comfort settings to meet an optimization objective such as minimum payment or maximum comfort. The formulation of an appliance commitment problem was described in the paper using an electrical water heater load as an example. The thermal dynamics of heating and coasting of the water heater load was modeled by physical models; random hot water consumption was modeled with statistical methods. The models were used to predict the appliance operation over the scheduling time horizon. User comfort was transformed to a set of linear constraints. Then, a novel linear, sequential, optimization process was used to solve the appliance commitment problem. The simulation results demonstrate that the algorithm is fast, robust, and flexible. The algorithm can be used in home/building energy-management systems to help household owners or building managers to automatically create optimal load operation schedules based on different cost and comfort settings and compare cost/benefits among schedules.

Du, Pengwei; Lu, Ning

2011-06-30T23:59:59.000Z

289

Upper Los Alamos Canyon Cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

septic tanks, sanitary and industrial waste lines, storm drains, incinerators, transformer sites, and areas in which soil has been contaminated. The Upper Los Alamos Canyon...

290

Los Alamos Lab: Bioscience Division  

NLE Websites -- All DOE Office Websites (Extended Search)

menubar | toolbar | links | content Los Alamos National Laboratory Lab Home | Phone ABOUT LANL ContactsEvent CalendarMapsOrganizationPhonebookPolicy CenterEmergency NEWS LIBRARY...

291

Los Angeles Unified School District  

Science Conference Proceedings (OSTI)

Los Angeles Unified School District. NVLAP Lab Code: 101505-0. Address and Contact Information: BSC Annex, Facility Services Div. Lab. 1449 So ...

2013-12-06T23:59:59.000Z

292

Los Alamos in SPACE | National Security Science Magazine | Los Alamos  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Alamos in SPACE Los Alamos in SPACE Since the launches of the first man-made objects (Sputnik and Explorer 1) to orbit the Earth more than a half-century ago, thousands of spacecraft have been launched, many of those carrying Los Alamos sensors and instrumentation systems. Our journey began with the research and development of a two-decade-long nuclear rocket program, Project Rover. In the 1950s, Los Alamos scientists, building on their nuclear expertise, examined new methods for rocket propulsion into space. In December 1960, in the thick of the Cold War and during negotiation of the Limited Test Ban Treaty, the Atomic Energy Commission and the National Aeronautics and Space Administration (NASA) first met to discuss a space-based system to detect nuclear explosions in the atmosphere and space. The nation turned to Los

293

Variable loading roller  

DOE Patents (OSTI)

An automatic loading roller for transmitting torque in traction drive devices in manipulator arm joints includes a two-part camming device having a first cam portion rotatable in place on a shaft by an input torque and a second cam portion coaxially rotatable and translatable having a rotating drive surface thereon for engaging the driven surface of an output roller with a resultant force proportional to the torque transmitted. Complementary helical grooves in the respective cam portions interconnected through ball bearings interacting with those grooves effect the rotation and translation of the second cam portion in response to rotation of the first. 14 figs.

Williams, D.M.

1988-01-21T23:59:59.000Z

294

Load management and the La Vereda passive solar community  

SciTech Connect

Reviewed are preliminary data available from some of the passive solar homes now operational at the La Vereda subdivision in Santa Fe, New Mexico. The major emphasis is Load Management - an electric utility term pertaining to when and how much energy is used by the customer. A customer's home is considered to be Load Managed when its major demands for electricity occur at times during the day when the utility has surplus generation capacity. For most utilities this surplus occurs during the night and is referred to as the off-peak period. Compared to conventional electric homes, the La Vereda passive solar homes are Naturally Load Managed because most of their backup heating requirements occur during the utility's off-peak period. Naturally Load Managed homes like these allow the backup heating system to operate freely whenever the space needs heat. Load data from six La Vereda homes are compared to similar data from 1) a group of nonsolar super-insulated total electric homes, and 2) the utility's winter system peak day load profile. The comparison verifies the Natural Load Management characteristics of the well-designed passive solar home. The free operation of the backup heating system, especially during cloudy or severe weather, can reduce the Natural Load Management characteristics of the La Verda homes. Is it possible to Force Load Management on a home, regardless of weather conditions and still guarantee that all space heating requirements are satisfied with off-peak energy. One home at La Vereda is discussed that has an experimental Forced Load Management backup heating system designed to use energy only during the utility's off-peak period. Load data from this home is presented and compared to other homes at La Verda.

Pyde, S.E.

1981-01-01T23:59:59.000Z

295

Statistical Review of UK Residential Sector Electrical Loads  

E-Print Network (OSTI)

This paper presents a comprehensive statistical review of data obtained from a wide range of literature on the most widely used electrical appliances in the UK residential load sector. It focuses on individual appliances and begins by consideration of the electrical operations performed by the load. This approach allows for the loads to be categorised based on the electrical characteristics, and also provides information on the reactive power characteristics of the load, which is often neglected from standard consumption statistics. This data is particularly important for power system analysis. In addition to this, device ownership statistics and probability distribution functions of power demand are presented for the main residential loads. Although the data presented is primarily intended as a resource for the development of load profiles for power system analysis, it contains a large volume of information which provides a useful database for the wider research community.

Tsagarakis, G; Kiprakis, A E

2013-01-01T23:59:59.000Z

296

OPERATIONS (OPS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPS) OPS) OBJECTIVE OPS.1 The formality and discipline of operations is adequate to conduct work safely and programs are in place to maintain this formality and discipline. (CR 13) Scope: The Conduct of Operations Program was evaluated during the recent KE Basin FTS ORR and was found to be adequately implemented. Based on this result and the subsequent program enhancements, the scope of the review is to be limited to the SWS operating and maintenance evolutions. Criteria * Programmatic elements of conduct of operations are in place for SWS operations. (DOE Order 5480.19) * The SWS operations personnel adequately demonstrate the principles of conduct of operations requirements during the shift performance period. (DOE Order 5480.19)

297

Extending operating range of a homogeneous charge compression ignition engine via cylinder deactivation  

DOE Patents (OSTI)

An HCCI engine has the ability to operate over a large load range by utilizing a lower cetane distillate diesel fuel to increase ignition delay. This permits more stable operation at high loads by avoidance of premature combustion before top dead center. During low load conditions, a portion of the engines cylinders are deactivated so that the remaining cylinders can operate at a pseudo higher load while the overall engine exhibits behavior typical of a relatively low load.

Hergart, Carl-Anders (Peoria, IL); Hardy, William L. (Peoria, IL); Duffy, Kevin P. (Metamora, IL); Liechty, Michael P. (Chillicothe, IL)

2008-05-27T23:59:59.000Z

298

Accelerator Operations and Technology, AOT: LANL  

NLE Websites -- All DOE Office Websites (Extended Search)

ADE Accelerator and Operations Technology, AOT ADE Accelerator and Operations Technology, AOT About Us AOT Home Groups Accelerator, Beam Science High Power Electrodynamics Instrumentation, Controls Mechanical Design Engineering Operations Radio Frequency Engineering CONTACTS Division Leader John Erickson Deputy Division Leader for Operations Martha Zumbro Deputy Division Leader for Technology Subrata Nath Administrator Jean N. Trujillo Phone: (505) 665-2683 Put a short description of the graphic or its primary message here Accelerator and Operations Technology The Accelerator and Operations Technology (AOT) Division at Los Alamos National Laboratory conducts fundamental and applied research and development needed to improve operations and operations support for the Los Alamos Neutron Science Center (LANSCE). AOT's R&D efforts include

299

Testing a new direct load control power line communication system  

SciTech Connect

South Carolina Electric and Gas is currently performing direct load control communications over power lines without using a power line carrier. This is the result of testing a load management system that combines the existing substation solid-state recording with voltage regulation capability. Using the solid-state recorder's extended control functions, the existing substation tap changer, a new patent-pending power line communications technique, and a patented voltage-step load control receiver, the system extends normal two-way communication between the utility operations and the substation with a one-way power line link to virtually any load. By varying the voltage level slightly, the system digitizes up to 32 different load control messages. The new voltage-step communication technique uses the substation's load tap changer to communicate one-way with the receivers over existing power lines. South Carolina Electric and Gas and the manufacturers have been performing a two-phase test of the load control system. Phase one testing showed that the percentage of successful load control message reception was 98%. Phase two testing is still in progress. Results to date show no deterioration of reception or equipment. Conclusions thus far are that the load management system is compatible with all installed utility equipment, and offers reliable direct load control.

Weers, D.D.; Shamsedin, M.A.

1987-07-01T23:59:59.000Z

300

Manhattan Project: Los Alamos Scientists  

Office of Scientific and Technical Information (OSTI)

Resources Resources About this Site How to Navigate this Site Library Maps Note on Sources Nuclear Energy and the Public's Right to Know Photo Gallery Site Map Sources and Notes Suggested Readings LOS ALAMOS SCIENTISTS Los Alamos (Laboratory) (August 1946) Resources > Photo Gallery Los Alamos, August 1946 Scientists attending a colloquium at Los Alamos, August 1946. Left to right, first row: Norris E. Bradbury, John H. Manley, Enrico Fermi, J. M. B. Kellogg. Second row: Robert Oppenheimer, Richard P. Feynman, Phil B. Porter. Third row: Gregory Breit (partially hidden), Arthur Hemmendinger, Arthur D. Schelberg. The photograph is courtesy Los Alamos National Laboratory. The identifications are from Richard G. Hewlett and Francis Duncan, Atomic Shield, 1947-1952: Volume II, A History of the United States Atomic Energy Commission (Washington: U.S. Atomic Energy Commission, 1972), opposite page 46.

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Critical partnerships: Los Alamos, universities, and industry  

SciTech Connect

Los Alamos National Laboratory, situated 35 miles northwest of Santa Fe, NM, is one of the Department of Energy`s three Defense Programs laboratories. It encompasses 43 square miles, employees approximately 10,000 people, and has a budget of approximately $1.1B in FY97. Los Alamos has a strong post-cold war mission, that of reducing the nuclear danger. But even with that key role in maintaining the nation`s security, Los Alamos views partnerships with universities and industry as critical to its future well being. Why is that? As the federal budget for R&D comes under continued scrutiny and certain reduction, we believe that the triad of science and technology contributors to the national system of R&D must rely on and leverage each others capabilities. For us this means that we will rely on these partners to help us in 5 key ways: We expect that partnerships will help us maintain and enhance our core competencies. In doing so, we will be able to attract the best scientists and engineers. To keep on the cutting edge of research and development, we have found that partnerships maintain the excellence of staff through new and exciting challenges. Additionally, we find that from our university and corporate partners we often learn and incorporate {open_quotes}best practices{close_quotes} in organizational management and operations. Finally, we believe that a strong national system of R&D will ensure and enhance our ability to generate revenues.

Berger, C.L.

1997-04-01T23:59:59.000Z

302

Government Operation  

Science Conference Proceedings (OSTI)

Use Cases from NBD(NIST Big Data) Requirements WG V1.0. http://bigdatawg. nist.gov/home.php. Contents. Blank Template. Government Operation ...

2013-09-07T23:59:59.000Z

303

Operations Research  

E-Print Network (OSTI)

Mar 1, 2005 ... Operations Research. Report 2005-01. On a closedness theorem. Miklós Ujvári. Marc 2005. Eötvös Loránd University of Sciences. Department ...

304

Operating Instructions  

Science Conference Proceedings (OSTI)

... The system operation is center around 3 areas of the equipment 1) Deposition chamber 2) Vaporizer 3) Chiller/cold finger ...

2013-01-18T23:59:59.000Z

305

Comparison of Wind Power and Load Forecasting Error Distributions: Preprint  

DOE Green Energy (OSTI)

The introduction of large amounts of variable and uncertain power sources, such as wind power, into the electricity grid presents a number of challenges for system operations. One issue involves the uncertainty associated with scheduling power that wind will supply in future timeframes. However, this is not an entirely new challenge; load is also variable and uncertain, and is strongly influenced by weather patterns. In this work we make a comparison between the day-ahead forecasting errors encountered in wind power forecasting and load forecasting. The study examines the distribution of errors from operational forecasting systems in two different Independent System Operator (ISO) regions for both wind power and load forecasts at the day-ahead timeframe. The day-ahead timescale is critical in power system operations because it serves the unit commitment function for slow-starting conventional generators.

Hodge, B. M.; Florita, A.; Orwig, K.; Lew, D.; Milligan, M.

2012-07-01T23:59:59.000Z

306

Los Alamos National Laboratory W76 Pit Tube Lifetime Study  

SciTech Connect

A metallurgical study was requested as part of the Los Alamos National Laboratory (LANL) W76-1 life-extension program (LEP) involving a lifetime analysis of type 304 stainless steel pit tubes subject to repeat bending loads during assembly and disassembly operations at BWXT/Pantex. This initial test phase was completed during the calendar years of 2004-2006 and the report not issued until additional recommended tests could be performed. These tests have not been funded to this date and therefore this report is considered final. Tubes were reportedly fabricated according to Rocky Flats specification P14548 - Seamless Type 304 VIM/VAR Stainless Steel Tubing. Tube diameter was specified as 0.125 inches and wall thickness as 0.028 inches. A heat treat condition is not specified and the hardness range specification can be characteristic of both 1/8 and 1/4 hard conditions. Properties of all tubes tested were within specification. Metallographic analysis could not conclusively determine a specified limit to number of bends allowable. A statistical analysis suggests a range of 5-7 bends with a 99.95% confidence limit. See the 'Statistical Analysis' section of this report. The initial phase of this study involved two separate sets of test specimens. The first group was part of an investigation originating in the ESA-GTS [now Gas Transfer Systems (W-7) Group]. After the bend cycle test parameters were chosen (all three required bends subjected to the same amount of bend cycles) and the tubes bent, the investigation was transferred to Terri Abeln (Metallurgical Science and Engineering) for analysis. Subsequently, another limited quantity of tubes became available for testing and were cycled with the same bending fixture, but with different test parameters determined by T. Abeln.

Abeln, Terri G. [Los Alamos National Laboratory

2012-04-25T23:59:59.000Z

307

Los Alamos National Laboratory: Long-Term Environmental Stewardship and  

NLE Websites -- All DOE Office Websites (Extended Search)

How did contaminants get there? How did contaminants get there? Historical operations used the best available waste handling methods for that time. Map of Los Alamos townsite bordered by Pueblo and Los Alamos Canyons Los Alamos townsite bordered by Pueblo and Los Alamos Canyons Historic liquid discharges and outfalls Ashley Pond TA-21 High Explosives Testing History of Regulatory Oversight at LANL Regulators decide how waste from LANL is handled and disposed. Fact Check » « Regulators make the majority of waste disposition determinations for the Laboratory. LANL is committed to compliance. Over 35 separate state and federal environmental regulations covering waste disposal, clean air, clean water, care of wildlife and plants, and handling of hazardous and radioactive substances ensure stewardship of these resources. When

308

Leader, Los Alamos National Laboratory Stimulus Project | National Nuclear  

National Nuclear Security Administration (NNSA)

Leader, Los Alamos National Laboratory Stimulus Project | National Nuclear Leader, Los Alamos National Laboratory Stimulus Project | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Who We Are > In The Spotlight > Carolyn Zerkle Leader, Los Alamos National Laboratory Stimulus Project Carolyn Zerkle Carolyn Zerkle Role: Leader, Los Alamos National Laboratory Stimulus Project

309

Los Alamos National Laboratory Advancing National Security Through Scientific  

NLE Websites -- All DOE Office Websites (Extended Search)

Scientific Scientific Inquiry LANL is a key player in energy security | pg. 14 In this Issue Take a look at LANL's visualization environment | pg. 20 October 2010 LANL is operated by Los Alamos National Security, LLC for the U.S. Department of Energy's National Nuclear Security Administration Editors: Barbara Mack and Jeff Berger Art Direction: Cisneros Design Produced by the Communications Office of Los Alamos National Laboratory E-mail: why@lanl.gov Printed on recycled paper LALP-10-054 About this magazine Why magazine is a new publication primarily for employees and retirees of Los Alamos National Laboratory. The Lab will publish Why four times a year and develop for it an online presence. This periodical is named for the crucial nature of scientific inquiry at Los Alamos

310

Los Alamos National Laboratory | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

National Laboratory | National Nuclear Security Administration National Laboratory | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Los Alamos National Laboratory Los Alamos National Laboratory http://www.lanl.gov/ Field Office: Los Alamos Field Office (NA-00-LA) manages the resources of the NNSA Los Alamos National Weapons Design Laboratory. NA-00-LA aims to

311

Leader, Los Alamos National Laboratory Stimulus Project | National Nuclear  

NLE Websites -- All DOE Office Websites (Extended Search)

Leader, Los Alamos National Laboratory Stimulus Project | National Nuclear Leader, Los Alamos National Laboratory Stimulus Project | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Who We Are > In The Spotlight > Carolyn Zerkle Leader, Los Alamos National Laboratory Stimulus Project Carolyn Zerkle Carolyn Zerkle Role: Leader, Los Alamos National Laboratory Stimulus Project

312

Los Alamos Field Office Emergency Public Information | National Nuclear  

NLE Websites -- All DOE Office Websites (Extended Search)

Field Office Emergency Public Information | National Nuclear Field Office Emergency Public Information | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Los Alamos Field Office Emergency Public Information Home > Field Offices > Welcome to the Los Alamos Field Office > Los Alamos Field Office Emergency Public Information Los Alamos Field Office Emergency Public Information

313

Los Alamos Lab: Los Alamos Molecular Recognition Alliance  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Alamos Molecular Recognition Alliance: LAMRA Los Alamos Molecular Recognition Alliance: LAMRA Home About Us Partner Divisions Bioscience Division Chemistry Division International and Applied Technology Materials Physics Applications Division Theoretical Division Researchers Customize Affinity Reagents to Recognize Diseases and Biothreat Agents Novel affinity reagents are essential in the chemical and biological detection that is at the heart of the Los Alamos National Laboratory's mission in threat reduction, as well as being at the interface between many fundamental and applied Los Alamos research programs. Affinity reagent technologies at LANL are among the most advanced worldwide, with a wide range of different technologies focused on molecular recognition and the generation of affinity reagents both developed and under development. These include different affinity reagents (antibodies, fluorescent proteins, peptides, peptoids, carbohydrates, and oligonucleotides), and different selection and screening systems.

314

Los Alamos National Security, LLC partners with Los Alamos National...  

NLE Websites -- All DOE Office Websites (Extended Search)

National Bank on Las Conchas recovery challenge fund LANS has given 50,000 as seed money to establish a fund at LANB. July 28, 2011 Los Alamos National Laboratory sits on top...

315

Los Alamos in SPACE | National Security Science Magazine | Los...  

NLE Websites -- All DOE Office Websites (Extended Search)

the farthest object in the universe ever observed, thought to be a giant star. Gamma-ray bursts, also discovered by Los Alamos instruments on Vela, continue to provide deep...

316

Simple models of district heating systems for load and demand side management  

E-Print Network (OSTI)

Simple models of district heating systems for load and demand side management and operational Energiforskningsprogrammet EFP ENS J.nr. 1373/01-0041 December 2004 #12;Simple models of district heating systems for load 87-7475-323-1 #12;Preface The research project "Simple models of district heating systems for load

317

Brief paper: An optimal control algorithm for nuclear reactor load cycling  

Science Conference Proceedings (OSTI)

An optimal control algorithm for reactor reactivity controls during CANDU& nuclear station load cycling is presented. The minimized performance index is reactor operating cost during a load cycling interval. The algorithm is developed using Pontryagin's ... Keywords: Nuclear reactors, boundary value problems, control nonlinearities, load regulation, maximum principle, optimal control, power station control

Dale B. Cherchas; Ron. T. Lake

1977-05-01T23:59:59.000Z

318

Adaptive genetic algorithm for solving sugarcane loading stations with multi-facility services problem  

Science Conference Proceedings (OSTI)

This paper presents a computational tool for operational planning of sugarcane loading stations. The loading stations are used to facilitate the supply of sugarcane to a sugar mill, especially for small-sized sugarcane growers whose fields are located ... Keywords: Adaptive genetic algorithm, Fuzzy logic control, Loading station, Location-allocation problem, Multi-facility services, Sugarcane

Woraya Neungmatcha, Kanchana Sethanan, Mitsuo Gen, Somnuk Theerakulpisut

2013-10-01T23:59:59.000Z

319

A new model for multi-objective load curtailment applied on deregulated environment  

Science Conference Proceedings (OSTI)

In the deregulated environment, transmission congestion is one major problem that needs to be handled in power system operation. This paper aims to alleviate congestion using the multi-objective load curtailment (MOLC) approach. The proposed MOLC approach ... Keywords: cost of load curtailment, fitting coefficient, multi-objective load curtailment, primal dual interior point method, security margin, voltage instability indicator

Sige Liu; Xiaoxin Zhou; Mingtian Fan; Haozhong Cheng

2009-05-01T23:59:59.000Z

320

Operations research  

Science Conference Proceedings (OSTI)

In Evita, Andrew Lloyd Webber and Tim Rice wrote: Politics, the Art of the Possible. To those of us in the operations research community, we postulate: Operations Research, the Science of Better - (i.e. better processes, better systems and better decisions). ...

William P. Pierskalla

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Operation crosscheck  

SciTech Connect

This report consists of three sections covering the three major areas of Lawrence Livermore Laboratory`s participation in Operation Crosscheck. These areas are: Diagnostic Aircraft; Radiochemical Sampling; and Device Assembly and Handling, Barbers Point. The information contained in these sections has been extracted from Crosscheck post-operation reports.

Gilbert, F. C.

1964-11-06T23:59:59.000Z

322

UNIVERSITY OF CALIFORNIA Los Angeles  

E-Print Network (OSTI)

MONITORING CATCHMENTS 84 4.2 POLLUTANT LOAD ANALYSIS USING STORMWATER QUALITY MODELS 90 4.2.1 Preliminary iv #12;3. METHODOLOGY 31 3.1 DATA REQUIREMENTS 32 3.2 SOFTWARE AND HARDWARE REQUIREMENTS 34 3 Landuse EMCs 66 3.5.4 Optimization of the Upper Ballona Creek Total Loadings 68 3.5.4.1 Data Screening 69

Stenstrom, Michael K.

323

Electric Load vs Time: Complicated World, Complicated Model  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Load vs Time: Complicated World, Complicated Model Electric Load vs Time: Complicated World, Complicated Model Speaker(s): Phillip Price Date: March 7, 2013 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Phillip Price "How much energy did I save by changing the operation of my building yesterday?" That turns out to be a very hard question to answer: you need to know how much energy you would have used under normal operations (the "baseline"), a number you can predict but not measure. In this talk we focus specifically on electrical energy ("electric load") in commercial buildings. Often the load can be broken down into several components that are superimposed on each other: a recurring weekly pattern, an effect of outdoor air temperature, and so on. Some buildings have patterns that are

324

Industrial Load Shaping: A Utility Strategy to Deal with Competition  

E-Print Network (OSTI)

In recent years competition from various sources such as cogeneration and bypass has led many utilities to refocus attention on their large industrial customers. Industrial load shaping is a customized program involving cost-effective process modifications and operational changes which result in a restructuring of the electric load profile of individual manufacturing facilities. Both the customer and the utility should realize benefits from these changes. There are five generic load shaping categories: rescheduling operations, capacity additions, product storage, automation and flexible manufacturing and electrotechnologies. The customized nature of the program requires that the utility work with industry experts to help customers identify specific load shape opportunities. The remainder of this paper provides guidelines for utility planners interested in developing such a program. It begins with an overview of general objectives, technology alternatives, market evaluation and selection criteria, and program implementation and monitoring procedures. The paper concludes with two utility case studies.

Bules, D.

1987-09-01T23:59:59.000Z

325

LOS ALAMOS NATIONAL LABORATORY COMMUNITY LEADERS SURVEY  

NLE Websites -- All DOE Office Websites (Extended Search)

LOS ALAMOS NATIONAL LABORATORY LOS ALAMOS NATIONAL LABORATORY COMMUNITY LEADERS SURVEY SEPTEMBER 2013 LOS ALAMOS NATIONAL LABORATORY-COMMUNITY LEADERS STUDY SEPTEMBER 2013 PAGE 2 RESEARCH & POLLING, INC. TABLE OF CONTENTS I. INTRODUCTION ....................................................................................................................................................................................................................................................... 3 METHODOLOGY ................................................................................................................................................................................................................................................................ 4 EXECUTIVE SUMMARY ........................................................................................................................................................................................................................................................ 5

326

Load Management: Opportunity or Calamity?  

E-Print Network (OSTI)

After the change in the economics of generating electricity which took place in 1973, many utilities are examining options to hold down their costs. One fact which is clear is that the difference between peak and off peak generating costs is much larger now than prior to 1973. Utilities are examining two options which can be termed load management. One option is to control discretionary loads during peak periods. Cycling of residential water heaters or shutting off industrial electric furnaces during peak periods are both examples of load control which lower the costs borne by the utility. The other option is the use of seasonal surcharges or time-of-day rates to induce customers to alter their usage patterns. Both these load management options focus on reducing utility costs overall without regard to the cost to the consumers affected by the load management options. The issue, then, is whether industrial customers can find opportunities to lower their costs under load management.

Males, R.; Hassig, N.

1981-01-01T23:59:59.000Z

327

Lista de los 10 Mejores  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Diez Mejores de Ahorremosgasolina Los Diez Mejores de Ahorremosgasolina EPA del 2014 EPA – Todos los Años Mundo Real – Todos los Años Falsas Ideas Ahorremosgasolina.org los Diez Mejores Considerados por la EPA como de Bajo Consumo de Combustible 2014 ¿Incluir autos eléctricos e híbridos eléctricos enchufables? Si No Los vehículos están calificados por una valoración combinada (55% ciudad y 45% carretera), después por ciudad. En el caso de un empate, varios autos compartirán el mismo lugar. 1. 2014 Chevrolet Spark EV 2014 Chevrolet Spark EV Combinadas 119 Ciudad 128/Carretera 109 Vehículo Eléctrico, Auto (A1) 2. 2014 Honda Fit EV 2014 Honda Fit EV Combinadas 118 Ciudad 132/Carretera 105 Vehículo Eléctrico, Auto (A1) 3. 2014 Fiat 500e 2014 Fiat 500e Combinadas 116 Ciudad 122/Carretera 108

328

Dynamic load balancing of applications  

DOE Patents (OSTI)

An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated.

Wheat, Stephen R. (Albuquerque, NM)

1997-01-01T23:59:59.000Z

329

Dynamic load balancing of applications  

DOE Patents (OSTI)

An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers is disclosed. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated. 13 figs.

Wheat, S.R.

1997-05-13T23:59:59.000Z

330

Maria Research Reactor loaded with LEU - Otwock, Poland | National Nuclear  

National Nuclear Security Administration (NNSA)

Maria Research Reactor loaded with LEU - Otwock, Poland | National Nuclear Maria Research Reactor loaded with LEU - Otwock, Poland | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Video Gallery > Maria Research Reactor loaded with LEU - ... Maria Research Reactor loaded with LEU - Otwock, Poland Maria Research Reactor loaded with LEU - Otwock, Poland

331

Modeling and analysis of unsymmetrical transformer banks serving unbalanced loads  

SciTech Connect

It is a common practice to serve combination three-phase and single-phase loads from an unsymmetrical three-phase transformer bank and a four-wire secondary. Depending upon the loads and company standards, nine different transformer connections can be considered along with either an open four wire or a quadraplex secondary. The selection of the proper connection and transformer ratings can be achieved by the correct modeling and analysis of a system consisting of an equivalent source, transformer bank, secondary, and loads. This paper develops the models for the nine transformer connections, the secondary, and the loads. A computer program has been written that allows the analysis of the system for loading and short-circuit studies. The paper includes several examples of different normal and abnormal operating conditions on some of the transformer connections.

Kersting, W.H. [New Mexico State Univ., Las Cruces, NM (United States). Coll. of Engineering; Phillips, W.H. [WH Power Consultants, Las Cruces, NM (United States)

1996-05-01T23:59:59.000Z

332

Operation Terminology  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Conservation Magnets require a large amount of power to control a particle beam. In order to conserve energy and money when a beam line is down, Operations will install a...

333

Alaska Village Electric Load Calculator  

DOE Green Energy (OSTI)

As part of designing a village electric power system, the present and future electric loads must be defined, including both seasonal and daily usage patterns. However, in many cases, detailed electric load information is not readily available. NREL developed the Alaska Village Electric Load Calculator to help estimate the electricity requirements in a village given basic information about the types of facilities located within the community. The purpose of this report is to explain how the load calculator was developed and to provide instructions on its use so that organizations can then use this model to calculate expected electrical energy usage.

Devine, M.; Baring-Gould, E. I.

2004-10-01T23:59:59.000Z

334

End-Use Load Research in a Smart Grid World  

Science Conference Proceedings (OSTI)

In October 2010, EPRI conducted a workshop with EPRI members to identify how broad application of "Smart Grid" or advanced metering infrastructure (AMI) technologies could both increase need for and reduce cost of acquiring high-quality load research data. Representatives from regulated utilities, independent system operators/regional transmission organizations (ISO/RTOs), and industry experts participated. Utility representatives said that they are using "antique" load shape data for forecasting, planni...

2010-12-23T23:59:59.000Z

335

STLOAD 1.0, Substation Equipment Thermal Loading Program  

Science Conference Proceedings (OSTI)

The Substation Equipment Thermal Loading Program, STLOAD Version 1.0 software is intended for use by substation engineers for the purpose of establishing thermal ratings for and making diagnostic evaluations of substation equipment. STLOAD 1.0 software calculates substation equipment operating temperatures and thermal ratings based on user-specified physical parameters for the equipment and user-specified load and air temperature data. Substation equipment that can be modeled using STLOAD includes strain...

2006-03-15T23:59:59.000Z

336

Latinas Crafting Sustainability in East Los Angeles  

E-Print Network (OSTI)

Dead, indigenismo, arts sustainability, East Los Angeles,Guajardo Latinas Crafting Sustainability in East Los Angelesin their growth and sustainability will help document their

Guajardo, Ana

2010-01-01T23:59:59.000Z

337

Los Alamos Public Schools recommended for accreditation  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Alamos Schools Recommended For Accreditation Community Connections: Our link to Northern New Mexico Communities Latest Issue:November 2013 All Issues submit Los Alamos...

338

Supercomputing Challenge top winners: Los Alamos schools  

NLE Websites -- All DOE Office Websites (Extended Search)

Supercomputing Challenge top winners: Los Alamos schools Supercomputing Challenge top winners: Los Alamos schools Cole Kendrick won the top prize for his research project,...

339

Independent Oversight Review, Los Alamos National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2012 Independent Oversight Review, Los Alamos National Laboratory - March 2012 March 2012 Review of the Los Alamos National Laboratory Nuclear Facility Configuration...

340

Manhattan Project: Army parade, Los Alamos  

Office of Scientific and Technical Information (OSTI)

Army parade, Los Alamos Events > Difficult Choices, 1942 > Enter the Army, 1942 People > Military Organizations > Army Corps of Engineers Army parade, Los Alamos...

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Critical Operating Constraints Forecast-- Functional Specification  

Science Conference Proceedings (OSTI)

Critical operating constraints that could result in curtailments of load may occur in a transmission grid with areas of potential generation deficit and limited transmission import capacities. In such situations, it is crucial that the grid operators have a tool to predict when and where critical operating constraints would occur. This report describes the functional specification of such a decision support tool, called the COCF (Critical Operating Constraint Forecast).

2008-03-04T23:59:59.000Z

342

A.: Modeling and forecasting electricity loads: A comparison  

E-Print Network (OSTI)

In this paper we study two statistical approaches to load forecasting. Both of them model electricity load as a sum of two components – a deterministic (representing seasonalities) and a stochastic (representing noise). They differ in the choice of the seasonality reduction method. Model A utilizes differencing, while Model B uses a recently developed seasonal volatility technique. In both models the stochastic component is described by an ARMA time series. Models are tested on a time series of system-wide loads from the California power market and compared with the official forecast of the California System Operator (CAISO). 1.

Rafa? Weron

2004-01-01T23:59:59.000Z

343

Static identification of delinquent loads  

E-Print Network (OSTI)

The effective use of processor caches is crucial to the performance of applications. It has been shown that cache misses are not evenly distributed throughout a program. In applications running on RISC-style processors, a small number of delinquent load instructions are responsible for most of the cache misses. Identification of delinquent loads is the key to the success of many cache optimization and prefetching techniques. In this paper, we propose a method for identifying delinquent loads that can be implemented at compile time. Our experiments over eighteen benchmarks from the SPEC suite shows that our proposed scheme is stable across benchmarks, inputs, and cache structures, identifying an average of 10 % of the total number of loads in the benchmarks we tested that account for over 90 % of all data cache misses. As far as we know, this is the first time a technique for static delinquent load identification with such a level of precision and coverage has been reported. While comparable techniques can also identify load instructions that cover 90 % of all data cache misses, they do so by selecting over 50 % of all load instructions in the code, resulting in a high number of false positives. If basic block profiling is used in conjunction with our heuristic, then our results show that it is possible to pin down just 1.3 % of the load instructions that account for 82 % of all data cache misses. 1.

Vlad-mihai Panait; Amit Sasturkar Ý

2004-01-01T23:59:59.000Z

344

LOAD FORECASTING Eugene A. Feinberg  

E-Print Network (OSTI)

's electricity price forecasting model, produces forecast of gas demand consistent with electric load. #12Gas demand Council's Market Price of Electricity Forecast Natural GasDemand Electric Load Aggregating Natural between the natural gas and electricity and new uses of natural gas emerge. T natural gas forecasts

Feinberg, Eugene A.

345

SSA Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Area Operations (SSA-Ops) Area Operations (SSA-Ops) "BOREAS Ops" was located at the Snodrifters Lodge, in Candle Lake, Saskatchewan. Radiosonde balloon launch at Ops The NASA Helicopter lands at Ops A meeting at the Snodrifter's Lodge Release of a radiosonde at the SSA operations center in Candle Lake. Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help | User Services - Tel: +1 (865) 241-3952 or E-mail: uso@daac.ornl.gov

346

BOREAS Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Study Area Operations/Thompson Airport (NSA-Ops) Study Area Operations/Thompson Airport (NSA-Ops) NSA Operations (NSA-Ops) The Keewatin Air Hanger: site of BOREAS Ops 1994 Dr. Piers Sellers working in Ops, 1994 BOREAS "Air Force" The NASA C-130 The University of Wyoming King Air The NASA Helicopter The NRC Twin Otter The NCAR Electra The Ontario Chieftain Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help |

347

Analysis of parametric transformer with rectifier load  

SciTech Connect

This paper describes a push-pull parametric transformer constructed using a pair of orthogonal-cores. The operating characteristics of the parametric transformer with a rectifier load were analyzed based on SPICE simulations. The analysis results show good agreement with experiment. It was found that the input surge current of the full-wave rectifier circuit with a smoothing capacitor can be compensated by the parametric transformer. Use of the parametric transformer as a power stabilizer is anticipated owing to its various functions such as for voltage regulation and overload protection.

Ichinokura, O.; Jinzenji, T. (Tohoku Univ., Sendai (Japan)); Tajima, K. (Akita Univ. (Japan))

1993-03-01T23:59:59.000Z

348

building load | OpenEI  

Open Energy Info (EERE)

load load Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (9 months ago) Date Updated July 02nd, 2013 (7 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

349

Wind load reduction for heliostats  

DOE Green Energy (OSTI)

This report presents the results of wind-tunnel tests supported through the Solar Energy Research Institute (SERI) by the Office of Solar Thermal Technology of the US Department of Energy as part of the SERI research effort on innovative concentrators. As gravity loads on drive mechanisms are reduced through stretched-membrane technology, the wind-load contribution of the required drive capacity increases in percentage. Reduction of wind loads can provide economy in support structure and heliostat drive. Wind-tunnel tests have been directed at finding methods to reduce wind loads on heliostats. The tests investigated primarily the mean forces, moments, and the possibility of measuring fluctuating forces in anticipation of reducing those forces. A significant increase in ability to predict heliostat wind loads and their reduction within a heliostat field was achieved.

Peterka, J.A.; Hosoya, N.; Bienkiewicz, B.; Cermak, J.E.

1986-05-01T23:59:59.000Z

350

Critical analysis of European load management practices. Final report for period January--July 1976  

SciTech Connect

Load management has been practiced in Europe for approximately a quarter century. A critical evaluation of the initial objectives and economic justifications for load management given in Europe may help energy policymakers in the U.S. assess the relevance of load management to meeting their current energy goals. Load management was adopted in Europe primarily to promote a growth in energy sales at a rate greater than the increase in capacity requirements. Utilities were able to improve daily load factors during the winter peak period; however, they may not have been successful in maintaining or improving their financial strength through load management. Increased capital and operating expenditures in the generation and distribution systems became necessary as the power system evolved in response to changing load characteristics. Rates charged to customers did not always produce adequate revenues from managed loads to cover the capital and operating costs to supply those loads. Comprehensive studies of the long-term costs and benefits might have prevented some of the load management problems experienced in Europe. Load management was not introduced in Europe to reduce utility production costs, conserve energy or scarce fuels, improve the environment, or influence summer loads. Accordingly, the European experience with load management may not be relevant to energy policymakers in the U.S. who desire to achieve these objectives.

1977-01-01T23:59:59.000Z

351

Definition: Operating Reserve | Open Energy Information  

Open Energy Info (EERE)

Operating Reserve Operating Reserve Jump to: navigation, search Dictionary.png Operating Reserve That capability above firm system demand required to provide for regulation, load forecasting error, equipment forced and scheduled outages and local area protection. It consists of spinning and non-spinning reserve.[1] View on Wikipedia Wikipedia Definition In electricity networks, the operating reserve is the generating capacity available to the system operator within a short interval of time to meet demand in case a generator goes down or there is another disruption to the supply. Most power systems are designed so that, under normal conditions, the operating reserve is always at least the capacity of the largest generator plus a fraction of the peak load. The operating reserve

352

Los Alamos Employees' Scholarship Fund  

NLE Websites -- All DOE Office Websites (Extended Search)

Commitment » Commitment » Los Alamos Employees' Scholarship Fund Los Alamos Employees' Scholarship Fund The LAESF campaign raises funds for scholarships that support students from Northern New Mexico who are pursuing four-year undergraduate degrees in fields that will serve the region. June 13, 2012 Scholarship winner and Lab Director Scholarship winner Micaela Lucero and Lab Director Charlie McMillan Contact Giving Campaigns & Volunteering Debbi Wersonick Community Programs Office (505) 667-7870 Email LANL Foundation (505) 753-8890 Email Helping area students pay for college During the 2013 campaign, our employees donated a record-breaking $313,000 that, with the LANS match, resulted in more than $563,000 for scholarships. About the Scholarship Program In 1998, Los Alamos National Laboratory (LANL) and its employees, retirees

353

Los Alamos National Laboratory top  

NLE Websites -- All DOE Office Websites (Extended Search)

top top science news of 2012 December 20, 2012 Scientific advances that caught the world's interest LOS ALAMOS, NEW MEXICO, December 20, 2012-In 2012 Los Alamos National Laboratory made its scientific mark in a wide variety of areas, and the stories that caught the public's attention and that of the science community reflect those broad capabilities. Top science stories for the year traveled from the canyons of Mars to the high desert forests of New Mexico, from cosmic particles to the structure of proteins and enzymes. Computer models of wildfires, and nuclear magnetic resonance signatures of plutonium, it all was fascinating for those following Los Alamos' science news. - 2 - Mars Science Laboratory Curiosity rover and ChemCam 2:12 ChemCam rock laser for the Mars Science Laboratory

354

Manhattan Project: Los Alamos Street Scene  

Office of Scientific and Technical Information (OSTI)

LOS ALAMOS STREET SCENE LOS ALAMOS STREET SCENE Los Alamos (The Town) Resources > Photo Gallery Los Alamos street scene. Fuller Lodge and the "Big House" are visible in the distance (see below). Above is a view of Los Alamos (looking north). In the distance, Fuller Lodge and the "Big House" are visible to the left and right, respectively (see below). The photograph is reproduced from Los Alamos Scientific Laboratory, Los Alamos: Beginning of an Era, 1943-1945 (Los Alamos: Public Relations Office, Los Alamos Scientific Laboratory, ca. 1967-1971), 13. The labels and "close-ups" below were made by the Office of History and Heritage Resources. Los Alamos street scene (labeled) Close-up of Fuller Lodge Close-up of the "Big House" Click on a link below to return to:

355

EA-1238: Proposed Construction and Operation of the Nonproliferation and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

38: Proposed Construction and Operation of the 38: Proposed Construction and Operation of the Nonproliferation and International Security Center, Los Alamos, New Mexico EA-1238: Proposed Construction and Operation of the Nonproliferation and International Security Center, Los Alamos, New Mexico SUMMARY This EA evaluates the environmental impacts for the proposal to construct and operate the Nonproliferation and International Security Center within the U.S. Department of Energy's Los Alamos National Laboratory Technical Area 3 located at Los Alamos, New Mexico. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD July 22, 1999 EA-1238: Finding of No Significant Impact Proposed Construction and Operation of the Nonproliferation and International Security Center July 22, 1999

356

A Liquid-Helium-Cooled Absolute Reference Cold Load forLong-Wavelength Radiometric Calibration  

SciTech Connect

We describe a large (78-cm) diameter liquid-helium-cooled black-body absolute reference cold load for the calibration of microwave radiometers. The load provides an absolute calibration near the liquid helium (LHe) boiling point, accurate to better than 30 mK for wavelengths from 2.5 to 25 cm (12-1.2 GHz). The emission (from non-LHe temperature parts of the cold load) and reflection are small and well determined. Total corrections to the LHe boiling point temperature are {le} 50 mK over the operating range. This cold load has been used at several wavelengths at the South Pole and at the White Mountain Research Station. In operation, the average LHe loss rate was {le} 4.4 l/hr. Design considerations, radiometric and thermal performance and operational aspects are discussed. A comparison with other LHe-cooled reference loads including the predecessor of this cold load is given.

Bensadoun, M.; Witebsky, C.; Smoot, George F.; De Amici,Giovanni; Kogut, A.; Levin, S.

1990-05-01T23:59:59.000Z

357

Short-Term Load Forecasting Error Distributions and Implications for Renewable Integration Studies: Preprint  

DOE Green Energy (OSTI)

Load forecasting in the day-ahead timescale is a critical aspect of power system operations that is used in the unit commitment process. It is also an important factor in renewable energy integration studies, where the combination of load and wind or solar forecasting techniques create the net load uncertainty that must be managed by the economic dispatch process or with suitable reserves. An understanding of that load forecasting errors that may be expected in this process can lead to better decisions about the amount of reserves necessary to compensate errors. In this work, we performed a statistical analysis of the day-ahead (and two-day-ahead) load forecasting errors observed in two independent system operators for a one-year period. Comparisons were made with the normal distribution commonly assumed in power system operation simulations used for renewable power integration studies. Further analysis identified time periods when the load is more likely to be under- or overforecast.

Hodge, B. M.; Lew, D.; Milligan, M.

2013-01-01T23:59:59.000Z

358

Los Alamos hot dry rock geothermal project  

DOE Green Energy (OSTI)

The greatest potential for geothermal energy is the almost unlimited energy contained in the vast regions of hot, but essentially impermeable, rock within the first six or seven km of the Earth's crust. For the past five years, the Los Alamos Scientific Laboratory has been investigating and developing a practical, economical and environmentally acceptable method of extracting this energy. By early 1978, a 10 MW (thermal) heat extraction experiment will be in operation. In the Los Alamos concept, a man-made geothermal reservoir is formed by drilling into a region of suitably hot rock, and then creating within the rock a very large surface for heat transfer by large-scale hydraulic-fracturing techniques. After a circulation loop is formed by drilling a second hole to intersect the fractured region, the heat contained in this reservoir is brought to the surface by the buoyant closed-loop circulation of water. The water is kept liquid throughout the loop by pressurization, thereby increasing the rate of heat transport up the withdrawal hole compared to that possible with steam.

Brown, D.W.; Pettitt, R.A.

1977-01-01T23:59:59.000Z

359

load data | OpenEI Community  

Open Energy Info (EERE)

51 51 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142234851 Varnish cache server load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI! building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: application/zip icon System Advisor Model Tool for Downloading Load Data

360

Management of Los Alamos National Laboratory's Cyber Security Program, IG-0880  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Los Alamos National Laboratory's Cyber Security Program DOE/IG-0880 February 2013 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 February 11, 2013 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Management of Los Alamos National Laboratory's Cyber Security Program" INTRODUCTION AND OBJECTIVE The Los Alamos National Laboratory (LANL), operated by the National Nuclear Security Administration on behalf of the Department of Energy, is one of the world's largest multi- disciplinary laboratories and is primarily responsible for helping to ensure the safety and

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Los Gatos, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

(Redirected from Los Gatos, CA) (Redirected from Los Gatos, CA) Jump to: navigation, search Equivalent URI DBpedia Coordinates 37.226611°, -121.9746797° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.226611,"lon":-121.9746797,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

362

Canada de los Alamos, New Mexico: Energy Resources | Open Energy  

Open Energy Info (EERE)

Canada de los Alamos, New Mexico: Energy Resources Canada de los Alamos, New Mexico: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.5930896°, -105.8611303° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.5930896,"lon":-105.8611303,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

363

West Whittier-Los Nietos, California: Energy Resources | Open Energy  

Open Energy Info (EERE)

Whittier-Los Nietos, California: Energy Resources Whittier-Los Nietos, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 33.9807058°, -118.0683713° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.9807058,"lon":-118.0683713,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

364

East Los Angeles, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Los Angeles, California: Energy Resources Los Angeles, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 34.0239015°, -118.1720157° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.0239015,"lon":-118.1720157,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

365

Los Alamitos, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Los Alamitos, California: Energy Resources Los Alamitos, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 33.8030716°, -118.0725641° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.8030716,"lon":-118.0725641,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

366

Baywood-Los Osos, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Baywood-Los Osos, California: Energy Resources Baywood-Los Osos, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.3072291°, -120.8384093° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.3072291,"lon":-120.8384093,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

367

Lake Los Angeles, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Los Angeles, California: Energy Resources Los Angeles, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 34.6124905°, -117.8281193° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.6124905,"lon":-117.8281193,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

368

Environmental surveillance at Los Alamos during 1995  

Science Conference Proceedings (OSTI)

This report describes the environmental surveillance program at Los Alamos National Laboratory (LANL or the Laboratory) during 1995. The Laboratory routinely monitors for radiation and for radioactive and nonradioactive materials at (or on) Laboratory sites as well as in the surrounding region. LANL uses the monitoring result to determine compliance with appropriate standards and to identify potentially undesirable trends. Data were collected in 1995 to assess external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Using comparisons with standards, regulations, and background levels, this report concludes that environmental effects from Laboratory operations are small and do not pose a demonstrable threat to the public, Laboratory employees, or the environment.

NONE

1996-10-01T23:59:59.000Z

369

Environmental surveillance at Los Alamos during 1992  

Science Conference Proceedings (OSTI)

This report describes the environmental surveillance program at Los Alamos National Laboratory during 1992. The Laboratory routinely monitors for radiation and for radioactive and nonradioactive materials at (or on) Laboratory sites as well as in the surrounding region. LANL uses the monitoring results to determine compliance with appropriate standards and to identify potentially undesirable trends. Data were collected in 1992 to assess external penetrating radiation; quantities of airborne emissions and liquid effluents; concentrations of chemicals and radionuclides in ambient air, surface waters and groundwaters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Using comparisons with standards, regulations, and background levels, this report concludes that environmental effects from Laboratory operations are small and do not pose a demonstrable threat to the public, laboratory employees, or the environment.

Kohen, K.; Stoker, A.; Stone, G. [and others

1994-07-01T23:59:59.000Z

370

Environmental surveillance at Los Alamos during 1979  

Science Conference Proceedings (OSTI)

This report documents the environmental surveillance program conducted by the Los Alamos Scientific Laboratory (LASL) in 1979. Routine monitoring for radiation and radioactive or chemical substances was conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of the data for 1979 on penetrating radiation, chemical and radiochemical quality of ambient air, surface and ground water, municipal water supply, soils and sediments, food, and airborne and liquid effluents are included. Comparisons with appropriate standards and regulations or with background levels from natural or other non-LASL sources provide a basis for concluding that environmental effects attributable to LASL operations are minor and cannot be considered likely to result in any hazard to the population of the area. Results of several special studies provide documentation of some unique environmental conditions in the LASL environs.

Not Available

1980-04-01T23:59:59.000Z

371

Environmental surveillance at Los Alamos during 1989  

SciTech Connect

This report describes the environmental surveillance program conducted by Los Alamos National Laboratory during 1989. Routine monitoring for radiation and radioactive or chemical materials is conducted on the Laboratory site as well as in the surrounding region. Monitoring results are used to determine compliance with appropriate standards and to permit early identification of potentially undesirable trends. Results and interpretation of data for 1989 cover external penetrating radiation; quantities of airborne emissions and effluents; concentrations of chemicals and radionuclides in ambient air, surface and ground waters, municipal water supply, soils and sediments, and foodstuffs; and environmental compliance. Comparisons with appropriate standards, regulations, and background levels provide the basis for concluding that environmental effects from Laboratory operations are small and do not pose a threat to the public, Laboratory employees, or the environment. 58 refs., 31 figs., 39 tabs.

Not Available

1990-12-01T23:59:59.000Z

372

EA-0534: Radioisotope Heat Source Fuel Processing and Fabrication, Los  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Radioisotope Heat Source Fuel Processing and Fabrication, 4: Radioisotope Heat Source Fuel Processing and Fabrication, Los Alamos, New Mexico EA-0534: Radioisotope Heat Source Fuel Processing and Fabrication, Los Alamos, New Mexico SUMMARY This EA evaluates the environmental impacts of a proposal to operate existing Pu-238 processing facilities at Savannah River Site, and fabricate a limited quantity of Pu-238 fueled heat sources at an existing facility at U.S. Department of Energy's Los Alamos National Laboratory. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD July 19, 1991 EA-0534: Finding of No Significant Impact Radioisotope Heat Source Fuel Processing and Fabrication July 19, 1991 EA-0534: Final Environmental Assessment Radioisotope Heat Source Fuel Processing and Fabrication

373

Los Alamos National Laboratory employees receive Pollution Prevention  

NLE Websites -- All DOE Office Websites (Extended Search)

Pollution Prevention Awardees Pollution Prevention Awardees Los Alamos National Laboratory employees receive Pollution Prevention Awards Nearly 400 employees on 47 teams received Pollution Prevention awards for protecting the environment and saving taxpayers more than $8 million. April 23, 2013 Molten plutonium in a crucible. The improved processing of old plutonium generates less than half of the waste of the former process. Molten plutonium in a crucible. The improved processing of old plutonium generates less than half of the waste of the former process. Contact Steve Sandoval Communications Office (505) 665-9206 Email The Pollution Prevention Awards are the result of people taking the initiative to improve their own operations. Protecting environment, saving taxpayer dollars LOS ALAMOS, N.M., April 23, 2013-Nearly 400 Los Alamos National

374

Independent Activity Report, Los Alamos Site Office - April 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 2012 April 2012 Independent Activity Report, Los Alamos Site Office - April 2012 April 2012 Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment [HIAR-LANL-2011-11-18] This activity report documents the results of the U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS) review of the Los Alamos Site Office (LASO) self-assessment of LASO's Nuclear Maintenance Management Program (NMMP) oversight program and activities. This self-assessment was led by the DOE LASO Facility Operations/Safety Engineering Team's (FO/SET) Nuclear Facility Maintenance Manager and was supported by a second member of the LASO FO/SET staff, an HSS subject matter expert, and a mechanical engineer from the National Nuclear Security

375

Los Alamos names four to Laboratory Fellows list | National Nuclear  

National Nuclear Security Administration (NNSA)

names four to Laboratory Fellows list | National Nuclear names four to Laboratory Fellows list | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Los Alamos names four to Laboratory Fellows list Los Alamos names four to Laboratory Fellows list Posted By Office of Public Affairs Four scientists have been inducted into the Los Alamos National Laboratory

376

Los Angeles Department of Water & Power | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Los Angeles Department of Water & Power (Redirected from City of Los Angeles, California (Utility Company)) Jump to: navigation, search Name Los Angeles Department of Water & Power Place California Utility Id 11208 Utility Location Yes Ownership M NERC Location WECC NERC WECC Yes ISO CA Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile.

377

Advanced nonintrusive load monitoring system  

E-Print Network (OSTI)

There is a need for flexible, inexpensive metering technologies that can be deployed in many different monitoring scenarios. Individual loads may be expected to compute information about their power consumption. Utility ...

Wichakool, Warit, 1977-

2011-01-01T23:59:59.000Z

378

OpenEI - building load  

Open Energy Info (EERE)

are given by a location defined by the Typical Meteorological Year (TMY) for which the weather data was collected. Commercial load data is sorted by the (TMY) site as a...

379

Permanent Load Shift Control Strategies  

NLE Websites -- All DOE Office Websites (Extended Search)

of Permanent Load Shifting for HVAC and other storage assets as it relates to summer on-peak demand, how it can be dynamically and autonomously controlled, and its relationship...

380

Analysis of the Thermal Loads on the KSTAR Cryogenic System  

SciTech Connect

A large-scale helium refrigeration system is one of the key components for the KSTAR (Korea Superconducting Tokamak Advanced Research) device. In the design of the refrigeration system, an estimation of the thermal loads on the cold mass is an important issue according to the operation scenario. The cold mass of the KSTAR device is about 250 tons including 30 superconducting (SC) coils and the magnet structure. In addition to the static thermal loads, pulsed thermal loads to the refrigeration system have been considered in the operation stage. The main pulsed thermal loads on magnet system are AC losses in the SC coils and eddy current losses in the magnet structure that depend on the magnetic field variation rate. The nuclear radiation loss due to plasma pulse operation is also considered. The designed cooling capacity of the refrigeration system is estimated to be about 9 kW at 4.5 K isothermal. In this paper, calculation of the various kinds of thermal loads on KSTAR cryogenic system and design of the large-scale helium refrigeration system are presented.

Kim, Y.S.; Oh, Y.K.; Kim, W.C.; Park, Y.M.; Lee, Y.J.; Jin, S.B.; Sa, J.W.; Choi, C.H.; Cho, K.W.; Bak, J.S.; Lee, G.S. [Korea Basic Science Institute, Yusung-Ku, Daejeon 305-806 (Korea, Republic of)

2004-06-23T23:59:59.000Z

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Load as a reliability resource in restructured electricity markets  

Science Conference Proceedings (OSTI)

Recent electricity price spikes demonstrate the value that demand-side responses could bring to a restructured US electricity system. This report considers how even a modest increase in demand elasticity could dramatically reduce these extremes in price volatility. The report provides a three-part assessment addressing the ability of customer's load to participate in competitive markets and the current and potential future role of customer loads as system reliability resources. The study begins by evaluating the extent to which customer loads might be able to provide electricity reliability or ancillary services and reviewing aspects of a large utility's direct load control program. The second phase of the assessment contains a survey of ways in which load has been used as a system reliability resource focusing on programs triggered by system conditions and a real-time price signal. It reviews the experience of: (1) the California ISO's Demand Relief and Participating Load programs; (2) Interruptible load programs in California; (3) the New England ISO's Load Management program; and (4) a ''mature'' program in New Zealand. The third phase of the assessment examines the status of the underlying metering, communication, and control technologies used to effect customer responses. The final section of the report provides a vision of how the future might look and uses it to outline a program of needed R&D to increase the role of customer loads as system reliability resources. Key elements of this research program include: addressing the needs of system operators, making effective use of load management assets, making use of new program design concepts, the design of end-use technologies, and benefiting from program experiences.

Kueck, J.D.; Kirby, B.J.; Eto, J.; Staunton, R.H.; Marnay, C.; Martinez, A.; Goldman, C.

2001-06-01T23:59:59.000Z

382

CRAD, Occupational Safety & Health - Los Alamos National Laboratory TA 55  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Laboratory Los Alamos National Laboratory TA 55 SST Facility CRAD, Occupational Safety & Health - Los Alamos National Laboratory TA 55 SST Facility A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Industrial Hygiene program at the Los Alamos National Laboratory TA 55 SST Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Occupational Safety & Health - Los Alamos National Laboratory TA 55 SST Facility More Documents & Publications CRAD, Conduct of Operations - Los Alamos National Laboratory TA 55 SST

383

Climate Data Operators (CDO)  

NLE Websites -- All DOE Office Websites (Extended Search)

Climate Climate Data Operators (CDO) Climate Data Operators (CDO) Description and Overview CDO is a large tool set for working on climate data. NetCDF 3/4, GRIB including SZIP compression, EXTRA, SERVICE and IEG are supported as IO-formats. Apart from that cdo can be used to analyse any kind gridded data not related to climate science. CDO has very small memory requirements and can process files larger than the physical memory. How to Use CDO module load cdo cdo [Options] Operators ... Further Information CDO Online Documentation Availability Package Platform Category Version Module Install Date Date Made Default cdo carver libraries/ I/O 1.4.1 cdo/1.4.1 2012-01-13 2012-01-13 cdo carver libraries/ I/O 1.4.6 cdo/1.4.6 2012-05-24 2012-05-25 cdo carver libraries/ I/O 1.6.1 cdo/1.6.1 2013-07-02

384

Los Alamos National Laboratory | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Laboratory Los Alamos National Laboratory Los Alamos National Laboratory Los Alamos National Laboratory | September 2006 Aerial View Los Alamos National Laboratory | September 2006 Aerial View Los Alamos National Laboratory's (LANL) primary mission is to provide scientific and engineering support to national security programs. LANL performs R&D, design, maintenance, and testing in support of the nuclear weapons stockpile. LANL also performs theoretical and applied R&D in such areas as materials science, physics, environmental science, energy, and health. Enforcement February 12, 2013 Enforcement Letter, NEL-2013-02 Issued to Los Alamos National Security, LLC related to a Radiological Contamination Event at the Los Alamos Neutron Science Center at Los Alamos National Laboratory

385

Seismic Loading for FAST: May 2011 - August 2011  

DOE Green Energy (OSTI)

As more wind farms are constructed in seismically active regions, earthquake loading increases in prominence for design and analysis of wind turbines. Early investigation of seismic load tended to simplify the rotor and nacelle as a lumped mass on top of the turbine tower. This simplification allowed the use of techniques developed for conventional civil structures, such as buildings, to be easily applied to wind turbines. However, interest is shifting to more detailed models that consider loads for turbine components other than the tower. These improved models offer three key capabilities in consideration of base shaking for turbines: 1) The inclusion of aerodynamics and turbine control; 2) The ability to consider component loads other than just tower loads; and 3) An improved representation of turbine response in higher modes by reducing modeling simplifications. Both experimental and numerical investigations have shown that, especially for large modern turbines, it is important to consider interaction between earthquake input, aerodynamics, and operational loads. These investigations further show that consideration of higher mode activity may be necessary in the analysis of the seismic response of turbines. Since the FAST code is already capable of considering these factors, modifications were developed that allow simulation of base shaking. This approach allows consideration of this additional load source within a framework, the FAST code that is already familiar to many researchers and practitioners.

Asareh, M. A.; Prowell, I.

2012-08-01T23:59:59.000Z

386

Repository Reference Disposal Concepts and Thermal Load Management Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repository Reference Disposal Concepts and Thermal Load Management Repository Reference Disposal Concepts and Thermal Load Management Analysis Repository Reference Disposal Concepts and Thermal Load Management Analysis A disposal concept consists of three parts: waste inventory (7 waste types examined), geologic setting (e.g., clay/shale, salt, crystalline, other sedimentary), and the engineering concept of operations (range of generic operational concepts examined). Two major categories for waste package emplacement modes are identified: 1) "open" where extended ventilation can remove heat for many years following waste emplacement underground; and 2) "enclosed" modes for clay/shale and salt media where waste packages are emplaced in direct or close contact with natural or engineered materials which may have temperature limits that constrain thermal

387

Repository Reference Disposal Concepts and Thermal Load Management Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repository Reference Disposal Concepts and Thermal Load Management Repository Reference Disposal Concepts and Thermal Load Management Analysis Repository Reference Disposal Concepts and Thermal Load Management Analysis A disposal concept consists of three parts: waste inventory (7 waste types examined), geologic setting (e.g., clay/shale, salt, crystalline, other sedimentary), and the engineering concept of operations (range of generic operational concepts examined). Two major categories for waste package emplacement modes are identified: 1) "open" where extended ventilation can remove heat for many years following waste emplacement underground; and 2) "enclosed" modes for clay/shale and salt media where waste packages are emplaced in direct or close contact with natural or engineered materials which may have temperature limits that constrain thermal

388

Draft Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

o o n c e p t u a l D r a w i n g of t h e C M R R F a c i l i t y Draft Environmental Impact Statement For the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico DOE/EIS-0350D May 2003 SUMMARY CMR Building TA-6 TA-55 U.S. Department of Energy National Nuclear Security Administration Los Alamos Site Office General questions regarding this EIS or for a copy of this EIS, please contact: AVAILABILITY OF THE DRAFT CMRR EIS Printed with soy ink on recycled paper Elizabeth Withers, EIS Document Manager U.S. Department of Energy Office of Los Alamos Site Operations 528 35th Street Los Alamos, New Mexico 87544-2201 Telephone: 1-877-491-4957 National Nuclear Security Administration iii COVER SHEET Responsible Agency: United States Department of Energy (DOE), National Nuclear Security

389

EA-1376: Proposed Construction and Operation of a New Interagency Emergency  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

376: Proposed Construction and Operation of a New Interagency 376: Proposed Construction and Operation of a New Interagency Emergency Operations Center at Los Alamos National Laboratory, Los Alamos, NM EA-1376: Proposed Construction and Operation of a New Interagency Emergency Operations Center at Los Alamos National Laboratory, Los Alamos, NM SUMMARY The Proposed Action is the construction and operation of a new Interagency Emergency Operations Center (Center) at Technical Area 69. The new Center would include a 30,000-square-foot (2,700-square-meter) facility, a garage, a 130-car parking lot, and a 150-foot (45-meter) tall fire suppression water storage tank with antenna attachments on about a 5-acre (2-hectare) site. The new Center would be designed as a state-of-the-art multi-use facility housing about 30 fulltime University of California and Los Alamos

390

Realizing load reduction functions by aperiodic switching of load groups  

SciTech Connect

This paper investigates the problem of scheduling ON/OFF switching of residential appliances under the control of a Load Management System (LMS). The scheduling process is intended to reduce the controlled appliances` power demand in accordance with a predefined load reduction profile. To solve this problem, a solution approach, based on the methodology of Pulse Width Modulation (PWM), is introduced. This approach provides a flexible mathematical basis for studying different aspects of the scheduling problem. The conventional practices in this area are shown to be special cases of the PWM technique. By applying the PWM-based technique to the scheduling problem, important classes of scheduling errors are identified and analytical expressions describing them are derived. These expressions are shown to provide sufficient information to compensate for the errors. Detailed simulations of load groups` response to switching actions are use to support conclusions of this study.

Navid-Azarbaijani, N. [McGill Univ., Montreal, Quebec (Canada). Dept. of Electrical Engineering; Banakar, M.H. [CAE Electronics Ltd., St. Laurent, Quebec (Canada)

1996-05-01T23:59:59.000Z

391

Los Alamos National Laboratory RSS  

NLE Websites -- All DOE Office Websites (Extended Search)

RSS Feed RSS Feed Los Alamos National Laboratory RSS Really Simple Syndication feeds providing LANL workers with news directly to your desktop. Los Alamos National Laboratory RSS Subscribe to LANL's RSS (Really Simple Syndication) feeds to get news delivered directly to your desktop! In addition to the feeds listed here, look for the small red feed icons across the site, or the orange auto-discovery icon in your browser bar, to subscribe to other feeds from www.lanl.gov. To view one of the LANL feeds in your RSS Aggregator (About RSS Aggregators): 1. Copy the URL/shortcut that corresponds to the topic that interests you. 2. Paste the URL into your reader. Title Copy URLs to RSS Reader Top Stories http://www.lanl.gov/newsroom/news-stories/index.rss New Releases http://www.lanl.gov/newsroom/news-releases/index.rss

392

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

PSLF that incorporates motor  A?C, ZIP, and electronic load the fractions motors A?C, ZIP, and electronic loads.    Usethat incorporates motor  A?C, ZIP, and  electronic load 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

393

load profile | OpenEI Community  

Open Energy Info (EERE)

load profile Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 13:03 Commercial and Residential Hourly Load Data Now Available on OpenEI building load building...

394

Monthly Crustal Loading Corrections for Satellite Altimetry  

Science Conference Proceedings (OSTI)

Satellite altimeter measurements of sea surface height include a small contribution from vertical motion of the seafloor caused by crustal loading. Loading by ocean tides is routinely allowed for in altimeter data processing. Here, loading by ...

R. D. Ray; S. B. Luthcke; T. van Dam

2013-05-01T23:59:59.000Z

395

Peak load management: Potential options  

SciTech Connect

This report reviews options that may be alternatives to transmission construction (ATT) applicable both generally and at specific locations in the service area of the Bonneville Power Administration (BPA). Some of these options have potential as specific alternatives to the Shelton-Fairmount 230-kV Reinforcement Project, which is the focus of this study. A listing of 31 peak load management (PLM) options is included. Estimated costs and normalized hourly load shapes, corresponding to the respective base load and controlled load cases, are considered for 15 of the above options. A summary page is presented for each of these options, grouped with respect to its applicability in the residential, commercial, industrial, and agricultural sectors. The report contains comments on PLM measures for which load shape management characteristics are not yet available. These comments address the potential relevance of the options and the possible difficulty that may be encountered in characterizing their value should be of interest in this investigation. The report also identifies options that could improve the efficiency of the three customer utility distribution systems supplied by the Shelton-Fairmount Reinforcement Project. Potential cogeneration options in the Olympic Peninsula are also discussed. These discussions focus on the options that appear to be most promising on the Olympic Peninsula. Finally, a short list of options is recommended for investigation in the next phase of this study. 9 refs., 24 tabs.

Englin, J.E.; De Steese, J.G.; Schultz, R.W.; Kellogg, M.A.

1989-10-01T23:59:59.000Z

396

Base load fuel comsumption with radiant boiler simulation  

Science Conference Proceedings (OSTI)

The operating point of an oil fired radiant boiler, 580 Megawatt capacity, is critical in maximizing the availability, performance, reliability, and maintainability of a power producing system. Operating the unit above the design operating point causes outages to occur sooner than scheduled. When the boiler is operated below the design operating point, fuel is wasted because the quantity of fuel required to operate a radiant boiler is the same, whether the design setpoint is maintained or not. This paper demonstrates by means of simulation software that the boiler design setpoints is critical to fuel consumption and optimum output megawatts. A boiler with this capacity is used to provide a portion of the base load of an electric utility in order to sustain revenues and maintain reliable generation.

Shwehdi, M.H. (Pennsylvania State Univ., Wilkes-Barre, Lehman, PA (United States)); Hughes, C.M. (Naval Aviation Depot, NAS Jacksonville, Jacksonville, FL (United States)); Quasem, M.A. (Howard Univ. School of Business, Washington, DC (United States))

1992-12-01T23:59:59.000Z

397

Building Energy Software Tools Directory: Load Express  

NLE Websites -- All DOE Office Websites (Extended Search)

graphical interface makes Load Express a powerful engineering tool with a very short learning curve. The "rookie" or experienced user can quickly and accurately perform load...

398

Decentralized customerlevel under frequency load shedding in...  

Open Energy Info (EERE)

enables the management of large groups of distributed loads under a single innovative control schemes to use the flexibility of electrical loads for power system purposes....

399

Cycling Losses During Screw Air Compressor Operation  

E-Print Network (OSTI)

Air compressors use 10-13 % of a typical industrial facilities' total electricity. Because they often operate at part load, their part load efficiency significantly affects plant energy cost. An intensive study of screw air compressor part load efficiency confirmed that modulation only controls are accurately portrayed by traditional part load models under most conditions. It also confirmed that load-unload type controls are accurately modeled when cycle times are longer than 5 minutes. However, the study revealed compressors with cycling controls require as much as 10-25 % more power than is normally assumed when cycle times decrease below 2 minutes. This short cycle time is common in industrial environments. The study also found that combined modulating and unloading controls operate the compressor as much as 20% more efficiently than previously predicted. Several measures are recommended for improving part load efficiency by up to 25 %: • Increase receiver capacity • Install load-unload controls • Maintain compressor controls • Set higher low-unloading setpoints.

Maxwell, J. B.; Wheeler, G.; Bushnell, D.

1995-04-01T23:59:59.000Z

400

Estimation of Seismic Load Demand for a Wind Turbine in the Time Domain: Preprint  

DOE Green Energy (OSTI)

Turbines installed in seismically active regions such as the Pacific Rim or the Mediterranean must consider loads induced by base shaking from an earthquake. To account for this earthquake risk, current International Electrotechnical Commission (IEC) certification requirements provide a simplified method for calculating seismic loads which is intended to be conservative. Through the addition of capabilities, it is now possible to simulate earthquake loading of a wind turbine in conjunction other load sources such as wind and control system behavior using the FAST code. This paper presents a comparison of three earthquake loading scenarios of the National Renewable Energy Laboratory (NREL) offshore 5-MW baseline wind turbine: idling; continued operation through an earthquake; and an emergency shutdown initiated by an earthquake. Using a set of 22 earthquake records, simulations are conducted for each load case. A summary of the resulting tower moment demand is presented to assess the influence of operational state on the resulting structural demand.

Prowell, I.; Elgamal, A.; Uang, C.; Jonkman, J.

2010-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Independent Oversight Review, Los Alamos National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Laboratory Chemistry and Metallurgy Research Facility - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility -...

402

Method for loading resin beds  

DOE Patents (OSTI)

An improved method of preparing nuclear reactor fuel by carbonizing a uranium loaded cation exchange resin provided by contacting a H.sup.+ loaded resin with a uranyl nitrate solution deficient in nitrate, comprises providing the nitrate deficient solution by a method comprising the steps of reacting in a reaction zone maintained between about 145.degree.-200.degree. C, a first aqueous component comprising a uranyl nitrate solution having a boiling point of at least 145.degree. C with a second aqueous component to provide a gaseous phase containing HNO.sub.3 and a reaction product comprising an aqueous uranyl nitrate solution deficient in nitrate.

Notz, Karl J. (Oak Ridge, TN); Rainey, Robert H. (Knoxville, TN); Greene, Charles W. (Knoxville, TN); Shockley, William E. (Oak Ridge, TN)

1978-01-01T23:59:59.000Z

403

Definition: Operating Reserve - Spinning | Open Energy Information  

Open Energy Info (EERE)

Reserve - Spinning Reserve - Spinning Jump to: navigation, search Dictionary.png Operating Reserve - Spinning The portion of Operating Reserve consisting of: Generation synchronized to the system and fully available to serve load within the Disturbance Recovery Period following the contingency event; or, Load fully removable from the system within the Disturbance Recovery Period following the contingency event.[1] View on Wikipedia Wikipedia Definition In electricity networks, the operating reserve is the generating capacity available to the system operator within a short interval of time to meet demand in case a generator goes down or there is another disruption to the supply. Most power systems are designed so that, under normal conditions, the operating reserve is always at least the capacity of the

404

Definition: Operating Reserve - Supplemental | Open Energy Information  

Open Energy Info (EERE)

Supplemental Supplemental Jump to: navigation, search Dictionary.png Operating Reserve - Supplemental The portion of Operating Reserve consisting of: Generation (synchronized or capable of being synchronized to the system) that is fully available to serve load within the Disturbance Recovery Period following the contingency event; or, Load fully removable from the system within the Disturbance Recovery Period following the contingency event.[1] View on Wikipedia Wikipedia Definition In electricity networks, the operating reserve is the generating capacity available to the system operator within a short interval of time to meet demand in case a generator goes down or there is another disruption to the supply. Most power systems are designed so that, under normal conditions, the operating reserve is always at least the capacity of the

405

The evaluation of a turbulent loads characterization system  

DOE Green Energy (OSTI)

In this paper we discuss an on-line turbulent load characterization system that has been designed to acquire loading spectra from turbines of the same design operating in several different environments and from different turbine designs operating in the same environment. This System simultaneously measures the rainflow-counted alternating and mean loading spectra and the hub-height turbulent mean shearing stress and atmospheric stability associated with the turbulent inflow. We discuss the theory behind the measurement configuration and the results of proof-of-concept testing recently performed at the National Wind Technology Center (NWTC) using a Bergey EXCEL-S 10-kW wind turbine. The on-line approach to characterizing the load spectra and the inflow turbulent scaling parameter produces results that are consistent with other measurements. The on-line approximation of the turbulent shear stress or friction velocity u* also is considered adequate. The system can be used to characterize turbulence loads during turbine deployment in a wide variety of environments. Using the WISPER protocol, we found that a wide-range, variable-speed turbine will accumulate a larger number of stress cycles in the low-cycle, high-amplitude (LCHA) region when compared with a constant speed rotor under similar inflow conditions.

Kelley, N.D.; McKenna, H.E. [National Renewable Energy Lab., Golden, CO (United States)

1996-01-01T23:59:59.000Z

406

Manhattan Project: Establishing Los Alamos, 1942-1943  

Office of Scientific and Technical Information (OSTI)

Entrance to the Los Alamos "Tech Area" ESTABLISHING LOS ALAMOS Entrance to the Los Alamos "Tech Area" ESTABLISHING LOS ALAMOS (Los Alamos: Laboratory, 1942-1943) Events > Bringing it All Together, 1942-1945 Establishing Los Alamos, 1942-1943 Early Bomb Design, 1943-1944 Basic Research at Los Alamos, 1943-1944 Implosion Becomes a Necessity, 1944 Oak Ridge and Hanford Come Through, 1944-1945 Final Bomb Design, 1944-1945 Atomic Rivals and the ALSOS Mission, 1938-1945 Espionage and the Manhattan Project, 1940-1945 Map of Los Alamos, New Mexico. The final link in the Manhattan Project's far-flung network was the bomb research and development laboratory at Los Alamos, located in the mountains of northern New Mexico. Codenamed "Project Y," the laboratory that designed and fabricated the first atomic bombs began to take shape in spring 1942 when James Conant suggested to Vannevar Bush that the Office of Scientific and Research Development and the Army form a committee to study bomb development. Bush agreed and forwarded the recommendation to Vice President Henry Wallace, Secretary of War Henry Stimson, and General George Marshall (the Top Policy Group). By the time of his appointment in late September, Leslie Groves had orders to set up a committee to study military applications of the bomb. Meanwhile, sentiment was growing among the Manhattan Project scientists that research on the bomb project needed to be better coordinated. Robert Oppenheimer, among others, advocated a central facility where theoretical and experimental work could be conducted according to standard scientific protocols. This would insure accuracy and speed progress. Oppenheimer suggested that the bomb design laboratory operate secretly in an isolated area but allow free exchange of ideas among the scientists on the staff. Groves accepted Oppenheimer's suggestion and began seeking an appropriate location. By the end of the year, they had settled on an unlikely site for the laboratory: an isolated boys' school on a mesa high in the Jemez Mountains (map at left).

407

Experimental verification of the load-following potential of a Hot Dry Rock geothermal reservoir  

Science Conference Proceedings (OSTI)

A recent 6-day flow experiment conducted at the Los Alamos National Laboratory's Fenton Hill Hot Dry Rock (HDR) test site in north-central New Mexico has verified that an HDR reservoir has the capability for a significant, and very rapid, increase in power output upon demand. The objective of this cyclic load-following experiment was to investigate the performance of the reservoir in a nominal high-backpressure (2200 psi) baseload operating condition upon which was superimposed greatly increased power production for a 4-hour period each day. In practice, this enhanced production was accomplished by dropping the production well backpressure from the preexisting level of 2200 psi down to about 500 psi to rapidly drain the fluid stored in the pressure-dilated joints surrounding the production well. During the last cycle of this six-cycle test, the mean production conditions were 146.6 gpm for 4 hours at a temperature of 189°C followed by 92.4 gpm for 20 hours at a temperature of 183°C. These flow and temperature values indicate a flow enhancement of 59%, and a power enhancement of 65% during the high-production period. The time required to increase the reservoir power output from the baseload to the peaking rate was about 2 minutes.

Brown, Donald

1996-01-24T23:59:59.000Z

408

Field Test Protocol: Standard Internal Load Generation in Unoccupied Test Homes  

Science Conference Proceedings (OSTI)

This document describes a simple and general way to generate House Simulation Protocol (HSP)-consistent internal sensible and latent loads in unoccupied homes. It is newly updated based on recent experience, and provides instructions on how to calculate and set up the operational profiles in unoccupied homes. The document is split into two sections: how to calculate the internal load magnitude and schedule, and then what tools and methods should be used to generate those internal loads to achieve research goals.

Fang, X.; Christensen, D.; Barker, G.; Hancock, E.

2011-06-01T23:59:59.000Z

409

A Dual Supply Buck Converter with Improved Light Load Efficiency  

E-Print Network (OSTI)

Power consumption is the primary concern in battery-operated portable applications. Buck converters have gained popularity in powering portable devices due to their compact size, good current delivery capability and high efficiency. However, portable devices are operating under light load condition for the most of the time. Conventional buck converters suffer from low light-load efficiency which severely limits battery lifetime. In this project, a novel technique for buck converter is proposed to reduce the switching loss by reducing the effective input supply voltage at light load. This is achieved by switching between two different input voltages (3.3V and 1.65V) depending on the output current value. Experimental results show that this technique improves the efficiency at light loads by 18.07%. The buck voltage possesses an output voltage of 0.9V and provides a maximum output current of 400mA. The buck converter operates at a switching frequency of 1MHz. The prototype was fabricated using 0.18µm CMOS technology, and occupies a total active area of 0.6039mm^2.

Chen, Hui

2013-05-01T23:59:59.000Z

410

Selecting a Control Strategy for Plug and Process Loads  

Science Conference Proceedings (OSTI)

Plug and Process Loads (PPLs) are building loads that are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the building occupants. PPLs in commercial buildings account for almost 5% of U.S. primary energy consumption. On an individual building level, they account for approximately 25% of the total electrical load in a minimally code-compliant commercial building, and can exceed 50% in an ultra-high efficiency building such as the National Renewable Energy Laboratory's (NREL) Research Support Facility (RSF) (Lobato et al. 2010). Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. A complex array of technologies that measure and manage PPLs has emerged in the marketplace. Some fall short of manufacturer performance claims, however. NREL has been actively engaged in developing an evaluation and selection process for PPLs control, and is using this process to evaluate a range of technologies for active PPLs management that will cap RSF plug loads. Using a control strategy to match plug load use to users' required job functions is a huge untapped potential for energy savings.

Lobato, C.; Sheppy, M.; Brackney, L.; Pless, S.; Torcellini, P.

2012-09-01T23:59:59.000Z

411

PRB rail loadings shatter record  

Science Conference Proceedings (OSTI)

Rail transport of coal in the Powder River Basin has expanded, with a record 2,197 trains loaded in a month. Arch Coal's Thunder basin mining complex has expanded by literally bridging the joint line railway. The dry fork mine has also celebrated its safety achievements. 4 photos.

Buchsbaum, L.

2008-09-15T23:59:59.000Z

412

Los Alamos National Security LLC Selected to Manage Los Alamos...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Y, came into existence in early 1943 for a single purpose: to design and build an atomic bomb. This is the first time since its creation that operation of the laboratory has...

413

Comparison of strength and load-based methods for testing wind turbine blades  

DOE Green Energy (OSTI)

The purpose of this paper is to compare two methods of blade test loading and show how they are applied in an actual blade test. Strength and load-based methods were examined to determine the test load for an Atlantic Orient Corporation (AOC) 15/50 wind turbine blade for fatigue and static testing. Fatigue load-based analysis was performed using measured field test loads extrapolated for extreme rare events and scaled to thirty-year spectra. An accelerated constant amplitude fatigue test that gives equivalent damage at critical locations was developed using Miner`s Rule and the material S-N curves. Test load factors were applied to adjust the test loads for uncertainties, and differences between the test and operating environment. Similar analyses were carried, out for the strength-based fatigue test using the strength of the blade and the material properties to determine the load level and number of constant amplitude cycles to failure. Static tests were also developed using load and strength criteria. The resulting test loads were compared and contrasted. The analysis shows that, for the AOC 15/50 blade, the strength-based test loads are higher than any of the static load-based cases considered but were exceeded in the fatigue analysis for a severe hot/wet environment.

Musial, W.D.; Clark, M.E.; Egging, N. [and others

1996-11-01T23:59:59.000Z

414

Load controller and method to enhance effective capacity of a photovoltaic power supply  

DOE Patents (OSTI)

A load controller and method are provided for maximizing effective capacity of a non-controllable, renewable power supply coupled to a variable electrical load also coupled to a conventional power grid. Effective capacity is enhanced by monitoring power output of the renewable supply and loading, and comparing the loading against the power output and a load adjustment threshold determined from an expected peak loading. A value for a load adjustment parameter is calculated by subtracting the renewable supply output and the load adjustment parameter from the current load. This value is then employed to control the variable load in an amount proportional to the value of the load control parameter when the parameter is within a predefined range. By so controlling the load, the effective capacity of the non-controllable, renewable power supply is increased without any attempt at operational feedback control of the renewable supply. The renewable supply may comprise, for example, a photovoltaic power supply or a wind-based power supply.

Perez, Richard (Delmar, NY)

2000-01-01T23:59:59.000Z

415

1998 Pacific Northwest Loads and Resources Study: The White Book.  

DOE Green Energy (OSTI)

The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for inventory planning to determine BPA revenues. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions, including expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The 1998 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the December 1997 Pacific Northwest Loads and Resources Study.

United States. Bonneville Power Administration.

1998-12-01T23:59:59.000Z

416

Effects of Data Cleansing on Load Prediction Boye A. Hverstad, Axel Tidemann and Helge Langseth  

E-Print Network (OSTI)

approach. I. INTRODUCTION A. Background Power load forecasting has been of interest for quite some time and a plethora of methods have been attempted to obtain accurate forecasting results. According to the time scale they operate on, load forecasting systems are often categorized as long-term, medium-term or short-term systems

Langseth, Helge

417

A computational intelligence scheme for the prediction of the daily peak load  

Science Conference Proceedings (OSTI)

Forecasting of future electricity demand is very important for decision making in power system operation and planning. In recent years, due to privatization and deregulation of the power industry, accurate electricity forecasting has become an important ... Keywords: Computational intelligence, Daily peak load, Mid-term load forecasting, Self-organizing map, Support vector machine

Jawad Nagi; Keem Siah Yap; Farrukh Nagi; Sieh Kiong Tiong; Syed Khaleel Ahmed

2011-12-01T23:59:59.000Z

418

Mitigation of Natural Disasters at Los Alamos National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos Field Office (Field Office), located in Los Alamos, New Mexico, and the NNSA Complex, located in Albuquerque, New Mexico. Our scope primarily encompassed the Los...

419

National Nuclear Security Administration LOS ALAMOS SITE OFFICE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LOS ALAMOS SITE OFFICE National Nuclear Security Administration CONTRACT MANAGEMENT PLAN For LOS ALAMOS NATIONAL LABORATORY CONTRACT NO. DE-AC52-06NA25396 Los Alamos...

420

Sixty-five New Mexico students receive Los Alamos Employees'...  

NLE Websites -- All DOE Office Websites (Extended Search)

2 May Los Alamos Employees' Scholarship Fund recipients Sixty-five New Mexico students receive Los Alamos Employees' Scholarship Fund scholarships Los Alamos High School...

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Follow-up Inspection on Material Control and Accountability at Los Alamos National Laboratory, INS-O-13-04  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Follow-up Inspection on Material Follow-up Inspection on Material Control and Accountability at Los Alamos National Laboratory INS-O-13-04 July 2013 Department of Energy Washington, DC 20585 July 18, 2013 MEMORANDUM FOR THE ACTING MANAGER, LOS ALAMOS FIELD OFFICE, NATIONAL NUCLEAR SECURITY ADMINISTRATION FROM: Sandra D. Bruce Assistant Inspector General for Inspections Office of Inspector General SUBJECT: INFORMATION: Inspection Report on "Follow-up Inspection on Material Control and Accountability at Los Alamos National Laboratory" INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Los Alamos National Laboratory (Los Alamos) is managed and operated under contract by Los Alamos National Security, LLC, for the National Nuclear Security Administration (NNSA). The Los Alamos Field Office is the Federal entity

422

Load Forecast For use in Resource Adequacy  

E-Print Network (OSTI)

Load Forecast 2019 For use in Resource Adequacy Massoud Jourabchi #12;In today's presentation d l­ Load forecast methodology ­ Drivers of the forecast f i­ Treatment of conservation ­ Incorporating impact of weather ­ Forecast for 2019 #12;Regional Loads (MWA and MW)Regional Loads (MWA and MW

423

Evolving non-intrusive load monitoring  

Science Conference Proceedings (OSTI)

Non-intrusive load monitoring (NILM) identifies used appliances in a total power load according to their individual load characteristics. In this paper we propose an evolutionary optimization algorithm to identify appliances, which are modeled as on/off ... Keywords: NILM, evolution, evolutionary algorithm, knapsack problem, non-intrusive load monitoring

Dominik Egarter; Anita Sobe; Wilfried Elmenreich

2013-04-01T23:59:59.000Z

424

Commercial equipment loads: End-Use Load and Consumer Assessment Program (ELCAP)  

SciTech Connect

The Office of Energy Resources of the Bonneville Power Administration is generally responsible for the agency's power and conservation resource planning. As associated responsibility which supports a variety of office functions is the analysis of historical trends in and determinants of energy consumption. The Office of Energy Resources' End-Use Research Section operates a comprehensive data collection program to provide pertinent information to support demand-side planning, load forecasting, and demand-side program development and delivery. Part of this on-going program is known as the End-Use Load and Consumer Assessment Program (ELCAP), an effort designed to collect electricity usage data through direct monitoring of end-use loads in buildings. This program is conducted for Bonneville by the Pacific Northwest Laboratory. This report provides detailed information on electricity consumption of miscellaneous equipment from the commercial portion of ELCAP. Miscellaneous equipment includes all commercial end-uses except heating, ventilating, air conditioning, and central lighting systems. Some examples of end-uses covered in this report are office equipment, computers, task lighting, refrigeration, and food preparation. Electricity consumption estimates, in kilowatt-hours per square food per year, are provided for each end-use by building type. The following types of buildings are covered: office, retail, restaurant, grocery, warehouse, school, university, and hotel/motel. 6 refs., 35 figs., 12 tabs.

Pratt, R.G.; Williamson, M.A.; Richman, E.E.; Miller, N.E.

1990-07-01T23:59:59.000Z

425

LANL continuity of operations plan  

SciTech Connect

The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an allhazards event, including a national security emergency, major fire, catastrophic natural disaster, man-made disaster, terrorism event, or technological disaster by rendering LANL buildings, infrastructure, or Technical Areas unsafe, temporarily unusable, or inaccessible.

Senutovitch, Diane M [Los Alamos National Laboratory

2010-12-22T23:59:59.000Z

426

Characterizing Household Plug Loads through Self-Administered Load Research  

Science Conference Proceedings (OSTI)

Household miscellaneous loads, which include consumer electronics, are the fastest growing segment of household energy use in the United States. Although the relative energy intensity of applications such as heating and cooling is declining, the DOEAnnual Energy Outlook forecasts that the intensity of residential miscellaneous end uses will increase substantially by 2030. Studies by TIAX and Ecos Consulting reveal that miscellaneous devices8212smaller devices in terms of energy draw but growing in usage8...

2009-12-09T23:59:59.000Z

427

Estimating Demand Response Load Impacts: Evaluation of BaselineLoad Models for Non-Residential Buildings in California  

SciTech Connect

Both Federal and California state policymakers areincreasingly interested in developing more standardized and consistentapproaches to estimate and verify the load impacts of demand responseprograms and dynamic pricing tariffs. This study describes a statisticalanalysis of the performance of different models used to calculate thebaseline electric load for commercial buildings participating in ademand-response (DR) program, with emphasis onthe importance of weathereffects. During a DR event, a variety of adjustments may be made tobuilding operation, with the goal of reducing the building peak electricload. In order to determine the actual peak load reduction, an estimateof what the load would have been on the day of the event without any DRactions is needed. This baseline load profile (BLP) is key to accuratelyassessing the load impacts from event-based DR programs and may alsoimpact payment settlements for certain types of DR programs. We testedseven baseline models on a sample of 33 buildings located in California.These models can be loosely categorized into two groups: (1) averagingmethods, which use some linear combination of hourly load values fromprevious days to predict the load on the event, and (2) explicit weathermodels, which use a formula based on local hourly temperature to predictthe load. The models were tested both with and without morningadjustments, which use data from the day of the event to adjust theestimated BLP up or down.Key findings from this study are: - The accuracyof the BLP model currently used by California utilities to estimate loadreductions in several DR programs (i.e., hourly usage in highest 3 out of10 previous days) could be improved substantially if a morning adjustmentfactor were applied for weather-sensitive commercial and institutionalbuildings. - Applying a morning adjustment factor significantly reducesthe bias and improves the accuracy of all BLP models examined in oursample of buildings. - For buildings with low load variability, all BLPmodels perform reasonably well in accuracy. - For customer accounts withhighly variable loads, we found that no BLP model produced satisfactoryresults, although averaging methods perform best in accuracy (but notbias). These types of customers are difficult to characterize withstandard BLP models that rely on historic loads and weather data.Implications of these results for DR program administrators andpolicymakersare: - Most DR programs apply similar DR BLP methods tocommercial and industrial sector customers. The results of our study whencombined with other recent studies (Quantum 2004 and 2006, Buege et al.,2006) suggests that DR program administrators should have flexibility andmultiple options for suggesting the most appropriate BLP method forspecific types of customers.

Coughlin, Katie; Piette, Mary Ann; Goldman, Charles; Kiliccote,Sila

2008-01-01T23:59:59.000Z

428

Load-shape development aids planning  

SciTech Connect

The concept that provides capable, load-shape development, is being adopted by several utilities and power pools. Public Service Electric and Gas Company has developed a computer simulation model that can predict a utility's load shape for up to a 30-year period. The objective of the PSE and G model, known as EICS (Electric Load-Curve Synthesis) is to provide a demand profile, to examine the impact of load mangement and other activities upon a system's load shape, and to apply appropriate forecast non-load-management and load-management impacts before finally examining the resulting revised load-shape. Other models dealing with load-shape are discussed. Specifically, the Systems Control Inc. model for EPRI (SCI/EPRI), useful in performing accurate simulations of various load-control strategies involving customer appliance control is mentioned.

Gellings, C.W.

1979-12-15T23:59:59.000Z

429

Beard to lead Business, Operations Directorate; Girrens named head of  

NLE Websites -- All DOE Office Websites (Extended Search)

Carl Beard new PADOPS Director Carl Beard new PADOPS Director Beard to lead Business, Operations Directorate; Girrens named head of Engineering Beard came to Los Alamos in 2006 to help lead the Stockpile Manufacturing and Support organization. May 4, 2011 Carl Beard Carl Beard Contact Steve Sandoval Communicatons Office (505) 665-9206 Email LOS ALAMOS, New Mexico, May 4, 2011-Carl Beard is the new principal associate director for Business and Operations at Los Alamos National Laboratory. Beard succeeds Mike Mallory, who earlier this year announced his retirement. "Carl is a highly accomplished and versatile leader, managing a wide range of scientific and manufacturing operations," Laboratory Director Michael Anastasio said. "At Los Alamos and elsewhere, Carl's teams have improved productivity and safely executed programs," he said, noting that

430

Preliminary Notice of Violation, Los Alamos National Laboratory - EA-98-10  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Laboratory - Los Alamos National Laboratory - EA-98-10 Preliminary Notice of Violation, Los Alamos National Laboratory - EA-98-10 September 21, 1998 Preliminary Notice of Violation issued to the University of California related to Multiple Events involving Radiation Protection and Quality Control Requirements at the Chemistry and Metallurgy Research Facility at the Los Alamos National Laboratory, (EA-98-10) This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances related to a series of events at the Chemistry and Metallurgy Research (CMR) Facility which led to a stand-down of all normal operations within CMR on September 2, 1997. The series of events in question occurred following July 7, 1997, when DOE issued an Enforcement Letter to Los Alamos National Laboratory (LANL), concerning potential

431

FY 2007 Los Alamos National Security, LLC, PER Summary | National Nuclear  

National Nuclear Security Administration (NNSA)

Los Alamos National Security, LLC, PER Summary | National Nuclear Los Alamos National Security, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2007 Los Alamos National Security, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2007 Los Alamos National Security, LLC, ...

432

FY 2009 Los Alamos National Security, LLC, PER Summary | National Nuclear  

National Nuclear Security Administration (NNSA)

Los Alamos National Security, LLC, PER Summary | National Nuclear Los Alamos National Security, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2009 Los Alamos National Security, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2009 Los Alamos National Security, LLC, ...

433

FY 2010 Los Alamos National Security, LLC, PER Summary | National Nuclear  

National Nuclear Security Administration (NNSA)

Los Alamos National Security, LLC, PER Summary | National Nuclear Los Alamos National Security, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2010 Los Alamos National Security, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2010 Los Alamos National Security, LLC, ...

434

Load Scheduling with Profile Information  

E-Print Network (OSTI)

. Within the past five years, many manufactures have added hardware performance counters to their microprocessors to generate profile data cheaply. We show how to use Compaq's DCPI tool to determine load latencies which are at a fine, instruction granularity and use them as fodder for improving instruction scheduling. We validate our heuristic for using DCPI latency data to classify loads as hits and misses against simulation numbers. We map our classification into the Multiflow compiler's intermediate representation, and use a locality sensitive Balanced scheduling algorithm. Our experiments illustrate that our algorithm improves run times by 1% on average, but up to 10% on a Compaq Alpha. 1 Introduction This paper explores how to use hardware performance counters to produce fine grain latency information to improve compiler scheduling. We use this information to hide latencies with any available instruction level parallelism (ILP). (ILP for an instruction is the number of o...

Götz Lindenmaier; Kathryn S. McKinley; Olivier Temam

2000-01-01T23:59:59.000Z

435

Status of Jefferson Lab's Load Locked Polarized Electron Beam  

DOE Green Energy (OSTI)

A new 100 kV load locked polarized electron gun has been built at Jefferson Lab. The gun is installed in a test stand on a beam line that resembles the first few meters of the CEBAF nuclear physics photoinjector. With this gun, a GaAs photocathode can be loaded from atmosphere, hydrogen cleaned, activated and taken to high voltage in less than 8 hours. The gun is a three chamber design, with all of the moving parts remaining at ground potential during gun operation. Studies of gun performance, photocathode life times, transverse emittance at high bunch charge, helicity correlated effects and beam polarizations from new photocathode samples will all be greatly facilitated by the use of this load locked gun.

M.L. Stutzman; P. Adderley; M. Baylac; J. Clark; A. Day; J. Grames; J. Hansknecht; M. Poelker

2002-09-01T23:59:59.000Z

436

Spinning Reserve From Hotel Load Response: Initial Progress  

SciTech Connect

This project was motivated by the fundamental match between hotel space conditioning load response capability and power system contingency response needs. As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. At ORNL s suggestion, Digital Solutions Inc. adapted its hotel air conditioning control technology to supply power system spinning reserve. This energy saving technology is primarily designed to provide the hotel operator with the ability to control individual room temperature set-points based upon occupancy (25% to 50% energy savings based on an earlier study [Kirby and Ally, 2002]). DSI added instantaneous local load shedding capability in response to power system frequency and centrally dispatched load shedding capability in response to power system operator command. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host the spinning reserve test. The Tennessee Valley Authority supplied real-time metering equipment in the form of an internet connected Dranetz-BMI power quality meter and monitoring expertise to record total hotel load during both normal operations and test results. The Sevier County Electric System installed the metering. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. These results are prior to implementing control over the common area air conditioning loads. Testing was also not at times of highest system or hotel loading. Full response occurred in 12 to 60 seconds from when the system operator s command to shed load was issued. The load drop was very rapid, essentially as fast as the 2 second metering could detect, with all units responding essentially simultaneously. Load restoration was ramped back in over several minutes. The restoration ramp can be adjusted to the power system needs. Frequency response testing was not completed. Initial testing showed that the units respond very quickly. Problems with local power quality generated false low frequency signals which required testing to be stopped. This should not be a problem in actual operation since the frequency trip points will be staggered to generate a droop curve which mimics generator governor response. The actual trip frequencies will also be low enough to avoid power quality problems. The actual trip frequencies are too low to generate test events with sufficient regularity to complete testing in a reasonable amount of time. Frequency response testing will resume once the local power quality problem is fully understood and reasonable test frequency settings can be determined. Overall the preliminary testing was extremely successful. The hotel response capability matches the power system reliability need, being faster than generation response and inherently available when the power system is under the most stress (times of high system and hotel load). Periodic testing is scheduled throughout the winter and spring to characterize hotel response capability under a full range of conditions. More extensive testing will resume when summer outdoor temperatures are again high enough to fully test hotel response.

Kueck, John D [ORNL; Kirby, Brendan J [ORNL

2008-11-01T23:59:59.000Z

437

PASSIVE DETECTION OF VEHICLE LOADING  

SciTech Connect

The Digital Imaging and Remote Sensing Laboratory (DIRS) at the Rochester Institute of Technology, along with the Savannah River National Laboratory is investigating passive methods to quantify vehicle loading. The research described in this paper investigates multiple vehicle indicators including brake temperature, tire temperature, engine temperature, acceleration and deceleration rates, engine acoustics, suspension response, tire deformation and vibrational response. Our investigation into these variables includes building and implementing a sensing system for data collection as well as multiple full-scale vehicle tests. The sensing system includes; infrared video cameras, triaxial accelerometers, microphones, video cameras and thermocouples. The full scale testing includes both a medium size dump truck and a tractor-trailer truck on closed courses with loads spanning the full range of the vehicle's capacity. Statistical analysis of the collected data is used to determine the effectiveness of each of the indicators for characterizing the weight of a vehicle. The final sensing system will monitor multiple load indicators and combine the results to achieve a more accurate measurement than any of the indicators could provide alone.

Garrett, A.

2012-01-03T23:59:59.000Z

438

Los Alamos National Laboratory: Long-Term Environmental Stewardship...  

NLE Websites -- All DOE Office Websites (Extended Search)

What waters does LANL protect? Map of Los Alamos townsite bordered by Pueblo and Los Alamos Canyons Los Alamos townsite bordered by Pueblo and Los Alamos Canyons Buckman Direct...

439

LANL:CPO: Los Alamos National Laboratory Impacts and Investments...  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL:CPO: Los Alamos National Laboratory Impacts and Investments in Los Alamos County LA-UR 11-02574 (42513) Los Alamos National Laboratory Impacts and Investments in Los Alamos...

440

The application of AM/FM system to distribution contingency load transfer  

SciTech Connect

In this paper, one of the geographic information management system (GIS) is applied to perform the automated mapping and facility management (AM/FM) of power distribution systems for contingency load transfer. Three phase load flow analysis is used to calculate the current flows of line switches by retrieving the network topology and facility attributes which have been stored in the AM/FM database. The current flows solved are then stored in the database as the attributes of line switches for load transfer analysis. When a system contingency such as fault or overload occurs, the load transfer is then executed to find the switches to be operated by the heuristic search method while subjected to the system operation rules. By the proposed method, the network topology can be easily updated and displayed in the computers by connectivity trace routine according to the switching operations. Since all the system facilities are stored in the AM/FM database according to the actual spatial coordinates, it provides practical information for the system operators and crews to allocate and operate the switches easily. To demonstrate the effectiveness of the integrated AM/FM system with application programs for distribution operation, a distribution system of Taiwan Power Company (Taipower) in Kaohsiung downtown area is selected for case study. It is found that contingency load transfer for distribution system operation can be enhanced significantly with the application of AM/FM systems significantly with the application of AM/FM systems to determine the switches to be operated and the corresponding spatial locations of the switches. The impact of load transfer to the system voltage profile and the feeder loading can also be analyzed to provide valuable information for the system operators.

Lee, T.E.; Chen, C.S.; Tzeng, Y.M.; Kang, M.S.; Lee, C.C. [National Sun Yat-Sen Univ., Kaohsiung (Taiwan, Province of China). Dept. of Electrical Engineering; Wu, J.S. [National Kaohsiung Institute of Technology (Taiwan, Province of China); Liu, T.S.S.; Chen, Y.M. [Taiwan Power Co., Taipei (Taiwan, Province of China)

1995-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EA-1332: Leasing Land for the Siting, Construction and Operation of a  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32: Leasing Land for the Siting, Construction and Operation of 32: Leasing Land for the Siting, Construction and Operation of a Commercial AM Radio Antenna at Los Alamos National Laboratory, Los Alamos, New Mexico EA-1332: Leasing Land for the Siting, Construction and Operation of a Commercial AM Radio Antenna at Los Alamos National Laboratory, Los Alamos, New Mexico SUMMARY This EA evaluates the environmental impacts for the proposal to lease approximately 3 acres of land at the U.S. Department of Energy's Los Alamos National Laboratory on the southeast tip of Technical Area 54 for the siting, construction and operation of an AM radio broadcasting antenna. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD February 16, 2000 EA-1332: Finding of No Significant Impact Leasing Land for the Siting, Construction and Operation of a Commercial AM

442

Los Alamos National Laboratory - Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Nuclear Safety Home Nuclear Sites Map Nuclear Sites List › Argonne National Laboratory › East Tennessee Technology Park › Hanford › Idaho Site › Los Alamos National Laboratory › Lawrence Livermore National Laboratory › Nevada National Security Site › New Brunswick Laboratory › Oak Ridge National Laboratory › Paducah › Pantex › Pacific Northwest National Laboratory › Portsmouth Gaseous Diffusion Plant › Sandia National Laboratories › Savannah River Site › Waste Isolation Pilot Plant › West Valley Demonstration Project › Y-12 National Security Complex HSS Reports - Enforcement - Corporate Safety Analysis Fire Protection DOELAP - Safety and Emergency Management Evaluations Safety Basis Information System Office of Corporate Safety Analysis

443

Information Sharing Across Transmission and Distribution Operations  

Science Conference Proceedings (OSTI)

In the real-time operation of the grid, there is a natural dividing line between the bulk power, or transmission, system and the distribution system. The increasing deployment of distributed resourcesincluding distributed energy resources (distributed generation) and curtailable load (demand response)will require update of transmission and distribution system processes and applications that ensure reliable and efficient grid operation. Closer coordination of activities will be necessary as both systems a...

2010-12-22T23:59:59.000Z

444

ARM - AMF Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

2014 Oliktok Point, Alaska, 2013 Los Angeles, California, to Honolulu, Hawaii, 2012 Cape Cod, Massachusetts, 2012 Gan Island, Maldives, 2011 Ganges Valley, India, 2011 Steamboat...

445

CRAD, Emergency Management - Los Alamos National Laboratory Waste...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Emergency Management - Los Alamos National Laboratory Waste...

446

Los Alamos exceeds waste shipping goal  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Alamos exceeds waste shipping goal Los Alamos exceeds waste shipping goal Los Alamos exceeds waste shipping goal Los Alamos shipped 1,074 cubic meters of transuranic (TRU) and mixed low-level waste to the Waste Isolation Pilot Plant and other approved waste disposal facilities. July 8, 2013 A shipment carrying Los Alamos transuranic waste heads down NM 502, bound for the Waste Isolation Pilot Plant in southeastern New Mexico. A shipment carrying Los Alamos transuranic waste heads down NM 502, bound for the Waste Isolation Pilot Plant in southeastern New Mexico. Contact Fred deSousa Communications Office (505) 665-3430 Email "We've made significant progress removing waste stored above ground at Area G, and we made this progress while maintaining an excellent safety record," said Jeff Mousseau, associate director of Environmental Programs

447

Clean Cities: Los Angeles Clean Cities coalition  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Los Angeles Clean Cities Coalition Los Angeles Clean Cities Coalition The Los Angeles Clean Cities coalition works with vehicle fleets, fuel providers, community leaders, and other stakeholders to reduce petroleum use in transportation. Los Angeles Clean Cities coalition Contact Information Wayne King 213-485-3936 wayne.king@lacity.org Coalition Website Clean Cities Coordinator Wayne King Photo of Wayne King Wayne King serves as the Los Angeles Clean Cities Coalition Coordinator and is employed as an Environmental Specialist with the City of Los Angeles. King has worked for the City since 2000. He began working with the Clean Cities Coalition around 2003 and was co-coordinator beginning in early 2009. In February 2010 he took on the role of Clean Cities Coordinator. His major job duties focus on mobile source air pollution reduction programs.

448

Los Alamos exceeds waste shipping goal  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Alamos exceeds waste shipping goal Los Alamos exceeds waste shipping goal Los Alamos exceeds waste shipping goal Los Alamos shipped 1,074 cubic meters of transuranic (TRU) and mixed low-level waste to the Waste Isolation Pilot Plant and other approved waste disposal facilities. July 8, 2013 A shipment carrying Los Alamos transuranic waste heads down NM 502, bound for the Waste Isolation Pilot Plant in southeastern New Mexico. A shipment carrying Los Alamos transuranic waste heads down NM 502, bound for the Waste Isolation Pilot Plant in southeastern New Mexico. Contact Fred deSousa Communications Office (505) 665-3430 Email "We've made significant progress removing waste stored above ground at Area G, and we made this progress while maintaining an excellent safety record," said Jeff Mousseau, associate director of Environmental Programs

449

Researcher, Los Alamos National Laboratory - Space and Remote Sensing Group  

National Nuclear Security Administration (NNSA)

and Remote Sensing Group and Remote Sensing Group | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Who We Are > In The Spotlight > Patrick Colestock Researcher, Los Alamos National Laboratory - Space and Remote Sensing Group Patrick Colestock Patrick Colestock Role: Researcher, Los Alamos National Laboratory - Space and Remote Sensing

450

Independent Activity Report, Los Alamos National Security - June 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Security - June National Security - June 2011 Independent Activity Report, Los Alamos National Security - June 2011 June 2011 Review of the Los Alamos National Security Emergency Operations Division Emergency Management Self-assessment Practices [HIAR-LANL-2011-06-08] This review evaluated the establishment and maintenance of specific elements of the ERO, including their responsibilities for initial and ongoing response to and mitigation of an emergency. Additionally, evaluation criteria addressed effective control at the event scene and integration of local agencies and organizations that provide onsite response services. The review also evaluated whether an adequate number of experienced and trained personnel, including designated alternates, are available on demand for timely and effective performance of assigned ERO

451

Researcher, Los Alamos National Laboratory - Space Science and Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Science and Applications Science and Applications Group | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Who We Are > In The Spotlight > Joaquin Birn Researcher, Los Alamos National Laboratory - Space Science and Applications Group Joaquin Birn Joaquin Birn Role: Researcher, Los Alamos National Laboratory - Space Science and

452

Researcher, Los Alamos National Laboratory - Space and Remote Sensing Group  

NLE Websites -- All DOE Office Websites (Extended Search)

and Remote Sensing Group and Remote Sensing Group | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Who We Are > In The Spotlight > Patrick Colestock Researcher, Los Alamos National Laboratory - Space and Remote Sensing Group Patrick Colestock Patrick Colestock Role: Researcher, Los Alamos National Laboratory - Space and Remote Sensing

453

Analysis and Synthesis of Load Forecasting Data for Renewable Integration Studies: Preprint  

SciTech Connect

As renewable energy constitutes greater portions of the generation fleet, the importance of modeling uncertainty as part of integration studies also increases. In pursuit of optimal system operations, it is important to capture not only the definitive behavior of power plants, but also the risks associated with systemwide interactions. This research examines the dependence of load forecast errors on external predictor variables such as temperature, day type, and time of day. The analysis was utilized to create statistically relevant instances of sequential load forecasts with only a time series of historic, measured load available. The creation of such load forecasts relies on Bayesian techniques for informing and updating the model, thus providing a basis for networked and adaptive load forecast models in future operational applications.

Steckler, N.; Florita, A.; Zhang, J.; Hodge, B. M.

2013-11-01T23:59:59.000Z

454

Electrical load management for the California water system  

DOE Green Energy (OSTI)

To meet its water needs California has developed an extensive system for transporting water from areas with high water runoff to areas with high water demand. This system annually consumes more than 6 billion kilowatt hours (kWh) of electricity for pumping water and produces more than 12 billion kWh/year of hydroelectric power. From the point of view of energy conservation, the optimum operation of the California water supply system would require that pumping be done at night and generation be done during the day. Night pumping would reduce electric power peak load demand and permit the pumps to be supplied with electricity from ''base load'' generating plants. Daytime hydro power generation would augment peak load power generation by fossil-fuel power plants and save fuel. The technical and institutional aspects of this type of electric power load management for water projects are examined for the purpose of explaining some of the actions which might be pursued and to develop recommendations for the California Energy Resources Conservation and Development Commission (ERCDC). The California water supply system is described. A brief description is given of various energy conservation methods, other than load management, that can be used in the management of water resources. An analysis of load management is presented. Three actions for the ERCDC are recommended: the Commission should monitor upcoming power contract negotiations between the utilities and the water projects; it should determine the applicability of the power-pooling provisions of the proposed National Energy Act to water systems; and it should encourage and support detailed studies of load management methods for specific water projects.

Krieg, B.; Lasater, I.; Blumstein, C.

1977-07-01T23:59:59.000Z

455

Wind loading on solar concentrators: some general considerations  

DOE Green Energy (OSTI)

A survey has been completed to examine the problems and complications arising from wind loading on solar concentrators. Wind loading is site specific and has an important bearing on the design, cost, performance, operation and maintenance, safety, survival, and replacement of solar collecting systems. Emphasis herein is on paraboloidal, two-axis tracking systems. Thermal receiver problems also are discussed. Wind characteristics are discussed from a general point of view; current methods for determining design wind speed are reviewed. Aerodynamic coefficients are defined and illustrative examples are presented. Wind tunnel testing is discussed, and environmental wind tunnels are reviewed; recent results on heliostat arrays are reviewed as well. Aeroelasticity in relation to structural design is discussed briefly. Wind loads, i.e., forces and moments, are proportional to the square of the mean wind velocity. Forces are proportional to the square of concentrator diameter, and moments are proportional to the cube of diameter. Thus, wind loads have an important bearing on size selection from both cost and performance standpoints. It is concluded that sufficient information exists so that reasonably accurate predictions of wind loading are possible for a given paraboloidal concentrator configuration, provided that reliable and relevant wind conditions are specified. Such predictions will be useful to the design engineer and to the systems engineer as well. Information is lacking, however, on wind effects in field arrays of paraboloidal concentrators. Wind tunnel tests have been performed on model heliostat arrays, but there are important aerodynamic differences between heliostats and paraboloidal dishes.

Roschke, E. J.

1984-05-01T23:59:59.000Z

456

Behavior of Capstone and Honeywell microturbine generators during load changes  

SciTech Connect

This report describes test measurements of the behavior of two microturbine generators (MTGs) under transient conditions. The tests were conducted under three different operating conditions: grid-connect; stand-alone single MTG with load banks; and two MTGs running in parallel with load banks. Tests were conducted with both the Capstone 30-kW and Honeywell Parallon 75-kW MTGs. All tests were conducted at the Southern California Edison /University of California, Irvine (UCI) test facility. In the grid-connected mode, several test runs were conducted with different set-point changes both up and down and a start up and shutdown were recorded for each MTG. For the stand-alone mode, load changes were initiated by changing load-bank values (both watts and VARs). For the parallel mode, tests involved changes in the load-bank settings as well as changes in the power set point of the MTG running in grid-connect mode. Detailed graphs of the test results are presented. It should be noted that these tests were done using a specific hardware and software configuration. Use of different software and hardware could result in different performance characteristics for the same units.

Yinger, Robert J.

2001-07-01T23:59:59.000Z

457

Self locking coupling mechanism for engaging and moving a load  

DOE Patents (OSTI)

A coupling mechanism for engaging and lifting a load has a housing with a guide passage for receiving a knob which is secured to the load through a neck of smaller diameter. A hollow ball in the housing has an opening which receives the knob and the ball is then turned to displace the opening from the housing passage and to cause the neck to enter a slot in the ball thereby securing the load to the coupling mechanism as elements of the housing block travel of the neck back into the opening when the ball is turned to the load holding orientation. As engagement of the load and locking of the coupling mechanism are accomplished simultaneously by the same ball motion, operation is simplified and reliability is greatly increased. The ball is preferably turned by a motor through worm gearing and the coupling mechanism may be controlled from a remote location. Among other uses, the coupling mechanism is adaptable to the handling of spent nuclear reactor fuel elements.

Wood, R.L.; Casamajor, A.B.; Parsons, R.E.

1980-09-12T23:59:59.000Z

458

New generation loading/mooring/storage (LMS) production platform  

SciTech Connect

A new generation loading/mooring/storage (LMS) production platform designed by Sumitomo Heavy Industries Ltd. and the Aker Group has been patented in the U.S. and several other countries by Mobil Oil Corp. The LMS vessel is a semisubmersible with ship mooring and loading facilities atop a box-shaped crude oil storage structure which floats well below the waterline. A capability is provided for loading tankers with 800,000 bbl of crude oil in only 12 hr. There are 15 dual-purpose cargo/ballast tanks in the lower section, with a control tower over the center tank. Upper and lower cargo tanks in the tower are each divided into three sections to provide additional crude handling flexibility. The LMS operates at a constant draft. Crude pumped into the LMS from the producing platform enters the tower tanks and is then transferred to a lower tank in which a diagonal suspended synthetic rubber diaphragm separates the oil from clean water ballast. During ship loading, the pressure of seawater reentering the dual tanks pushes the crude to the tower, where cargo pumps deliver it to the loading vessel.

1978-07-01T23:59:59.000Z

459

,"California - Los Angeles Basin Onshore Nonassociated Natural...  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","California - Los Angeles Basin Onshore Nonassociated Natural Gas, Wet After Lease Separation,...

460

Independent Oversight Assessment, Los Alamos National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 2012 Assessment of Nuclear Safety Culture at the Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project The U.S. Department of Energy (DOE)...

Note: This page contains sample records for the topic "loading operation los" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Independent Activity Report, Los Alamos National Laboratory ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Laboratory - November 2010 November 2010 Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project Orientation Visit The U. S. Department...

462

Los Angeles Mayors Office | Open Energy Information  

Open Energy Info (EERE)

Angeles, California Zip 90012-3239 Product String representation "The Clean Tech ... LEED community." is too long. References Los Angeles Mayors Office1 LinkedIn Connections...

463

Researcher, Los Alamos National Laboratory - Applied Physics...  

National Nuclear Security Administration (NNSA)

his scientific field through analysis of nuclear deterrence. He has advised both Los Alamos and Lawrence Livermore national labs on the complexities of the aging nuclear stockpile...

464

Los Alamos National Laboratory - Enforcement Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

National Security, LLC related to Glovebox Activities at TA-55 and Chemistry and Metallurgy Research Facilities at the Los Alamos National Laboratory, January 4, 2008...

465

Dateline Los Alamos: Top Science News  

NLE Websites -- All DOE Office Websites (Extended Search)

monitoring technology also helped scientists discover insights into space, such as gamma-ray bursts, lightning and other phenomena. Last year, a Los Alamos instrument aboard the...

466

Reliability Technology earns prestigious Los Alamos award  

NLE Websites -- All DOE Office Websites (Extended Search)

Reliability Technology earns award Reliability Technology earns prestigious Los Alamos award LANL has honored Michael Hamada, Harry Martz and a team of researchers with its first...

4